Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
R-2016-198 2016-10-24
RESOLUTION NO. R2016-198 A Resolution of the City Council of the City of Pearland, Texas, awarding a fixed price contract for construction services associated with the internal lining rehabilitation of the Liberty and Suburban Garden Road ground storage water tanks to Pardalis Industrial Enterprises, Inc., in the amount of $184,125.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That bids were obtained for the internal lining rehabilitation of the Liberty and Suburban Garden Road ground storage water tanks. Section 2. That the City Council hereby awards a bid to Pardalis Industrial Enterprises, Inc.. in the total amount of S184,125.00. Section 3. The City Manager or his designee is hereby authorized to execute a contract for the internal lining rehabilitation of the Liberty and Suburban Garden Road ground storage water tanks. PASSED, APPROVED and ADOPTED this the 24th day of October, A.D., 2016. ATTEST: APPROVED AS TO FORM: DARR1N M. COKER CITY ATTORNEY TOM REID MAYOR Project Manual ,, ,g for: J Liberty and Suburban Garden Ground Storage Tank Rehabilitation. O, `0 PF,Q� 4 0 'PEW ' - .' „, ., ,. ,. . , 4 , . . .. ( ,r E. X A sj . L. I'. 189 DOCUMENTS ISSUED FOR CONSTRUCTION These"Issued for Construction"Contract Documents have been prepared by revising the Bidding Documents to record references to addenda,field orders or change orders issued as of 4/29/2016. l k, The.Bidding Documents may have been revised to incorporate these revisions directly into the"Issued.for Construction" ,p Contract Documents. Contractor is responsible for determining that these documents are consistent with their understanding of.the Bidding Documents as modified per the appropriate provisions of the Contract Documents, The Bidding Documents,as modified per the appropriate provisions of the Contract Documents,take precedence over these "Issued for Construction"documents. Resolution No R2016-198 Exhibit "A" Bid No. : 0216-23 March, 2016 Prepared By Freese and Nichols, Inc t Texas Registered Engineenng Firm F-2144 11200 Broadway St, Suite 2332 Pearland, Texas 77584 Phone 832-456-4700 Fax. 832-456-4701 Project isanual for: Liberty and Suburban Garden Ground Storage Tank Rehabilitation PEE. ... • 0: TF 111 WILLIAM C .HERNDON j %�� 97312 % STE��;���� 40/6Vjgce., Mar 16 201:6 FREESE AND NICHOLS, INC TEXAS REGISTERED ENGINEERING FIRM F-2144 Bid No. : O216-23 March,. 2016 Prepared By: , FREESE NICHOLS Freese and Nichols,Inc. • Texas Registered Engineering Firm F-2144 11200 Broadway St, Suite 2332 Pearland, Texas 77584: Phone. 832-456-4700 Fax. 832-456-4701 CITY OF PEARLAND BRAZORIA COUNTY, TEXAS TABLE OF CONTENTS NO. OF SECTION TITLE PAGES , i DIVISION0—.BIDDING AND CONTRACT DOCUMENTS.. . 00100 Invitation to Bid 3 00200 Instructions to Bidders .. 8 00300 Bid Proposal 2 00300 Bid Proposal Form 1 00500 Standard Form of Agreement 7 00500 Appendix A-Title VI Assurances 2 00610 Performance Bond 2 00611 Payment Bond 2 00612 One-Year Mamtenance Bond 2 00615 Partial Waiver of Lien 1 00700 :General Conditions of Agreement 36 00800 Special Conditions.of Agreement 2 00811 Wage Scale for Engineering Construction 4 A 00901 Addenda 5 , ,,DIVISION.1.=GENERAL,REQUIREMENTS; , 01100 Summary of Work 2 01140 :Contractor's Use of Premises 4 01200 Measurement and Payment Procedures .: 3 01290 Change Order Procedures 4 01310 Coordination and Meetings 3 01350 Submittals 7 01380 Construction Photographs 3 01420 Referenced Standards 5 01430 Contractor's Quality Control 2 01440 Observation Services 1 01450 Testing Laboratory Services 3 01500 Temporary Facilities and Controls 11 01505 Mobilization 2 01550 Stabilized Construction Exits 3 01555 Traffic Control and Regulation 4 01561 Reinforced Filter Fabnc Barrier 3 01562 Waste Material Disposal 3 01563 Tree and Plant Protection 4 01564 Control of Ground Water and Surface Water 8 01565 TPDES Requirements 85 01566 Source Controls for Erosion and Sedimentation 5 01570 Trench Safety System 4 01600 Material and Equipment 3 01630 . Product Options and Substitutions 3, Nolo- 1 of 2 CITY OF PEARLAND TABLE OF CONTENTS 01750 Starting Systems 2 01760 Project Record Documents 2 01770 Contract Closeout 2 DIVISION 2—SITE WORK , ' 02200 Site Preparation 4 02220 Site Demolition 5 02910 Topsoil 3 02921 Hydromulch Seeding 4 02922 Sodden: 4 SUPPLEMENTAL SPECIFICATIONS DIVISION 9=FINISHES . 09950 I Coatings for Water Storage Tanks I 27 „ ,� t,,. , ,DIVISION 13 SPECIAL;CONSTRUCTION ,. 13409 Steel Water Tank Re'air 13 PROJECT DETAILS 1 Location Map 2 Liberty Ground Storage Tank Plan 3 Suburban Garden Ground Storage Tank Plan 4 Ladder Details 5 Handrail Details 6 Vacuum Relief Vent APPENDICES A Liberty Inspection Report 26 B Suburban Garden Inspection Report 23 END OF SECTION 00010-2of2 CITY OF PEARLAND INVITATION TO BID Section 00100 INVITATION.TO BID CITY OF PEARLAND, TEXAS Lowest Responsible Bidder Sealed Electronic Bids will be accepted for the following project, in the City's E-bid System. Electronic bids shall be submitted through the City's web site at: https.//pearland.ionwave.net/Login.aspx. All interested Bidders are required to register as a "supplier" on the City's E-bid System at the above web address and clicking on "Supplier Registration" Registration provides automatic access to any changes to the Plans, Specifications or Bid time and date. However, submission of an E-bid requires completing a short registration questionnaire found on this web site. When prompted to add or remove commodity codes registrants must add the codes listed below- * Building Construction Services,New(Includes Maintenance and Repair Services) * Construction Services, General (Includes Maintenance.and Repair Services) * Construction Services, Heavy(Includes Maintenance and Repair Services) * Construction Services, Trade(New Construction) For more information regarding registration instructions, see INSTRUCTIONS TO BIDDERS, Section 00200, included in the project bid documents viewable on the web site. Questions regarding electronic bidding should be directed to City Purchasing Officer at ebids@pearlandtx.gov All Bids submitted electronically will remain confidential until the opening date and time when they will be opened and read into the public record. Bids, shall be submitted on the form provided in the E-bid System and submitted electronically through this system to the City Purchasing Officer, City of Pearland, City Hall located at 3519 Liberty Dnve, Pearland, Texas 77581 Electronic bids will be accepted until 10:00 a.m.,Friday, April. 81 2016 All Bids shall reference the following project information in the appropriate locations in provided electronic format. All properly submitted bids shall be publicly "opened" and read aloud into the public record following the closing of the acceptance period for the construction of: Liberty and Suburban Garden Ground Storage Tank Rehabilitation City of Pearland, Texas COP PN: Liberty/Garden BID NO.: 0216-23 A mandatory pre-bid conference will be held at the City of Pearland City Hall at 3519 Liberty Dnve, Pearland, Texas 77581 at 10:00 a.m.. on March 29, 2016. The project will entail the rehabilitation of the Liberty and Suburban Garden Ground Storage. Tanks; including but not limited to interior coatings, handrails,vents, and ladders. 02-2015 00100-1 of 3 CITY OF PEARLAND INVITATION TO BID Upon award of a contract, the successful Bidder will be required to utilize the City's web based project management software, "Pro-Trak" for the administration of the construction project, including but not limited to,all transmittals and material submittals,RFI's,RFC's,Change Orders, Applications for Payment and all project communications with the City,its Construction Manager and Engineer This system has certain hardware, internet access and operation requirements that form the basis for all project communications,documentation and records for the project.For more information, see INSTRUCTIONS TO BIDDERS, Section 00200 Electronic Bid Documents: including Contract Documents, Plans and Technical Specifications are available for download on the City's Website at: https.//pearland.ionwave.net/Login.aspx upon registration. The documents are NOT viewable without registration. These same documents are also available at the following locations. City of Pearland, City Hall (281) 652-1600 Purchasing Department 3519 Liberty Drive Pearland, Texas 77581 Amtek Plan.Room (713) 956-0100 4001 Sherwood Houston, TX 77092 The Associated General Contractors of America, Inc. (713) 334-7100 2400 Augusta, Suite 350 Houston, TX 77057 Virtual Builders Exchange (832) 613-0201 7035 W Tidwell Building J, Suite 112 Houston, TX 77092 McGrawHill Construction—Dodge Reports 1-800-393-6343 No plan fees or deposits are required for plans and bid documents obtained through the City's E- bid System. BIDDERS MUST REGISTER AS A SUPPLIER ON THE CITY'S E-BID SYSTEM IN ORDER TO SUBMIT A BID EVEN IF BID DOCUMENTS ARE OBTAINED VIA ONE OF THE PLAN HOUSES Bidders accept sole responsibility for downloading all of the required documents, plans, specifications bid forms and addenda required for bidding. No bid may be withdrawn or terminated for a period of ninety (90) days subsequent to the bid opening date without the consent of the City of Pearland. Unless otherwise expressly provided herein, all references to "day(s)" shall mean calendar day(s). Bid Security.and Bonds: Bid Security in the form of Cashier's Check, Certified Check, or Bid Bond.,payable to the City of Pearland in the amount of 5% of the total base bid price must accompany each proposal. Bidders submitting bids electronically through the E-bid System shall 02-2015 00100-2 of 3 CITY OF PEARLAND INVITATION TO BID scan and up-load a copy of the sealed Bid Bond as an attachment to their bid. Original documents for Bid Security shall be requested by the City from the lowest two bidders and delivered to the City's Purchasing Officer within 48 business hours of the Bid Opening. Bid Security shall be delivered to Office of City Purchasing, Finance Department,2nd Floor City Hall, 3519 Liberty Drive, Pearland, Texas 77581 The successful Bidder must furnish Performance and Payment Bonds as required by Chapter 2253 of the Texas Government Code or other applicable law, as amended, upon the form included in the Contract Documents, in the amount of one hundred percent(100%) of the contract price, such bonds to be executed by a corporate surety duly authorized to do business in the State of Texas, and named in the current list of"Treasury Department Circular No 570", naming the City of Pearland, Texas as Obligee. Additionally,the successful bidder shall be required to provide a one year Maintenance Bond for the improvements installed as part of this work, as provided in the Special Conditions of Agreement. Equal Opportunity: All responsible bidders will receive consideration for award of contract without regard to race, color,religion, sex, or national origin. Nondiscrimination: The City, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S C 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally- Assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Selection Criteria: The Contract is to be awarded on the basis of Lowest Responsible Bidder In identifying this critena the City will consider 1) lowest total bid price for all work listed and specifically requested, including but not limited to Base Bid, Extra Work items and selected Alternates. The City of Pearland reserves the right to award a contract based on any combination of the above considered to be in its best interests or to reject any or all bids. A bid that has been"opened"may not be changed for the purposes of correcting an error in the bid price. Young Lorfing, TRMC City Secretary, City of Pearland First Publication date March 17, 2016 Second Publication date March 24, 2016 02-2015 00100-3 of 3 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS Section 00200 INSTRUCTIONS TO BIDDERS 1 Defined Terms 1 1 The term "Owner" hereinafter is defined, as the City of Pearland and is used interchangeably with the term"the City" Both terms are synonymous and refer to the City 1.2 The term "Bidder" means one who submits a Bid Proposal directly to Owner, as distinct from a sub-bidder, who.submits a bid to a Bidder The term "Successful Bidder" means the lowest responsible Bidder to whom the Owner (on the basis of Owner's evaluation as hereinafter provided)makes an award. The term "Bid Documents" includes the Invitation to Bidders, Instructions to Bidders, the Bid Proposal, and the proposed Contract Documents (including.all Addenda issued prior to receipts of bids). 1.3 The term"B-bid System"refers to-the City's electronic bidding system. This is a web- based system that provides all Bid Documents electronically to potential Bidders and forms the pathway for interested Bidders to submit bids in response to advertisement and invitation. The term "e-bid" and/ or "electronic bid" means the Bidders' electronic response submitted on the electronic Bid Proposal to the Owner by way of the E-bid System. The terms "electronic bid" or"e-bid" are used inter-changeably to describe the above bid process to submit an authorized bid to the City in response to an Invitation to Bidders. 1 4 The term "Pro-Trak" means the City's web-based contract administration and construction records management system used by involved parties to administer the project. This system serves as the web accessed centralized information distribution hub for commumcations and document management, pay application processing and record retention for all project documentation. Operational instructions for this system will be issued to the successful Bidder at the pre-Construction Meeting. 1.5 All other definitions set out in the Contract Documents are applicable to terms used in the Bidding Documents. 1 6 Unless otherwise expressly provided herein, all references to "day(s)" shall mean consecutive calendar day(s). 2. Registration for E-bid System 2.1 The Owner's E-bid System is accessible via the City's web site at https.//pearland.ionwave.net/Login.aspx. Bid documents can be viewed by simply selecting .a specific project from the BID OPPORTUNITIES list and clicking on that project AFTER registration as a Supplier Potential Bidders MUST REGISTER as a"Supplier"by clicking on the Supplier.Registration button and completing the registration form. When prompted to add or remove commodity codes registrants must add the codes listed below. * Building Constriction Services,New(Includes Maintenance and Repair Services) * Construction Services, General(Includes Maintenance and Repair Services) * Construction Services, Heavy(Includes Maintenance and Repair Services) * Construction Services; Trade(New Construction) 12-2014 00200-1 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS Select the appropriate Time Zone for the Bidder's location and whether that location observes Daylight Savings time. Complete the registration information providing all required contact information and establish password security for the E-bid System. Once complete, "suppliers" will receive emails notifying of bid opportunities. Downloading any project bid data will automatically place the bidder's contact information on the list of plan holders list and the E- bid System will automatically send any and all updates, changes or addenda associated with that project. 2.2 The electronic Bid Proposal can only be submitted through this system. The form can be printed for Bidder's use, but the Bid Proposal MUST be submitted on the electronic form within the E-bid System. 2.3 Questions regarding use of the E-bid System may be directed by email to ebids@pearlandtx.gov 3 Copies of Bidding Documents 3 1 Complete sets of "electronic" Bidding Documents are available for download to registered Bidders at No Cost from the City's E-bid System at: www.pearlandtx.gov/bids. Interested Bidders must register as a "Supplier" on this site in order to receive the Bid Documents, and all Addenda or other notifications of changes, including communications from the Owner or Engineer All Bid Documents are available to download and pnnt. 3.2 The Bidder accepts sole responsibility for ensuring that he obtains a full set of these documents by completing the registration and executing a full and complete download of the project documents. Downloading of Bid Documents automatically ensures receipt of any,and all subsequent communications from the City or its Engineer 3.2 Copies of Bidding Documents are available or may be viewed at any of the Plan Houses listed in the Invitation to Bidders. It is recommended that all interested Bidders, whether bidding directly to the Owner or Sub-bidders bidding to a Bidder, register as a Supplier and download the project Bid Documents. 3.3 Complete sets of Bidding Documents must be used in preparing Bid Proposals, neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents including, but not limited to. all Addenda issued prior to bid. 3 4 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bid Proposals on the Work, and do not confer a license or grant for any other use. 4 Qualifications of Bidders 41 In determining to whom to award a contract, the 'City of Pearland may consider, in addition to the other selection criteria identified in section 16 of these Instructions to Bidders, the following Qualifications of Bidder, and each Bidder must be prepared to submit within two (2) days of Owner's request any or all of such Qualifications requested. 1) A bnef narrative of previous expenence of the Bidder with projects of a similar nature and scope; 12-2014 00200-2 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS 2) A list, including owner name and project location, of on-going projects and contracts for construction of projects of the Bidder which are not yet substantially complete; 3)A list of proposed subcontractors and suppliers for the project being bid, 4) A list of name, address and telephone number of references for projects completed by Bidder; and 5) A Financial Statement of Bidder, consisting of the balance sheet and annual income statement of Bidder for the Bidder's last fiscal year end preceding the submission of the Bid Proposal, which has been audited or examined by an independent certified public accountant. The Financial Statement of Bidder shall be used to determine a Bidder's net working capital, which is defined as current assets less current liabilities. A Bidder's net working capital shall be considered evidence of the Bidder's ability to provide sufficient financial management of the project being bid. The Bidder's Financial Statement shall be clearly and conspicuously marked as "confidential", and shall be deemed and treated as confidential and excepted from the Public Information disclosure requirements of Texas Government Code Section 552.001 et seq, as such information, if released, would give advantage to a competitor or bidder, and/or would cause substantial competitive harm to Bidder 5 Examination of Contract Documents and Site 5 1 It is the responsibility of each Bidder before submitting a Bid Proposal, to (a) examine the Bidding Documents thoroughly, (b) visit the site to become familiar with local conditions that may affect cost, progress, performance or furnishing of the Work, (c) consider federal, state and local laws and regulations that may affect cost, progress, performance or furnishing of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors, omissions or discrepancies in the Contract Documents, (f) to recognize and plan for use of the City's "Pro-Trak" software to administer the construction process and perform the work of the project. 5.2 Any reports of explorations and tests of conditions at the site which have been utilized by the Engineer in preparation of the Contract Documents will be made available to Bidders for review, but such reports are not part of the Contract Documents. Bidder may not and should not rely upon the accuracy of the data contained m such reports, interpretations or opinions contained therein, or the completeness thereof, for the purposes of bidding or construction. 5.3 Information and data reflected in the Contract Documents with respect to underground utilities, equipment or other underground facilities at or contiguous to the site is based upon information and data furnished to Owner and Engineer by owners of such underground facilities or others, and Owner does not assume responsibility for the accuracy or completeness thereof. 5 4 Before submitting a Bid Proposal, each Bidder will, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and underground facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work and which Bidder deems necessary to determine its Bid Proposal prices for performing and furnishing the Work in 12-2014 00200-3 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS accordance with the Contract Time, Contract Price and other terms and conditions of the Contract Documents. 5.5 On request in advance, Owner will provide each prospective Bidder access to the site to conduct such explorations and tests as each prospective Bidder deems necessary for submission of a Bid Proposal. Prospective Bidders shall fill all holes, clean up and restore the site to its former condition upon completion of such explorations. 5 6 The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands, access thereto or contractual arrangements for use by the Contractor required for temporary construction facilities or storage of materials and equipment are to be provided by Contractor Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by Owner unless otherwise provided in the Contract Documents. 5 7 The submission of a Bid Proposal will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid Proposal is premised upon performing and furnishing all of the Work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in, required by or reasonably inferred from the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 6 Interpretations and Addenda 6 1 All questions about the meaning or intent of the Contract Documents are to be directed to Engineer Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered or transmitted by electronic means to all registered Bidders in the City's E-bid System. Questions received less than five (5) days prior to the date for opening of Bid Proposals may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 6.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by Owner or Engineer Addenda will automatically be made available to all registered Bidders that have downloaded Bid Documents from the City's E-bid System. 7 Bid Security 7 1 Each Bid Proposal must be accompanied by bid security made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid Proposal price, in the form of a certified check, cashier's check or a Bid Bond("Bid Security"). 7.2 Bidders submitting bids through the E-bid System shall scan and up-load a copy of their Bid Security (sealed Bid Bond, Certified Check or Cashier's Check ) as an attachment to their electronic bid. Original documents for Bid Security shall be requested by the City from the lowest two bidders and delivered to the City's Purchasing Officer within 48 12-2014 00200-4 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS business hours of the Bid Opening. Bid Security shall be delivered to Office of City Purchasing, Finance Department,2nd Floor City Hall, 3519 Liberty Drive, Pearland, Texas 77581 7.3 The Bid Security of the Successful Bidder will be retained until such time as Bidder has executed the 'Standard Form of Agreement, and furnished the required Performance and Payment Bonds, whereupon the Bid Security of both bidders will be returned. If the Successful Bidder fails to execute and deliver the Standard Form of Agreement and furnish the required performance and payment bonds within ten (10) days after the Notice of Award, Owner may annul the Notice of Award and shall be entitled to make a claim against the Bid Security The Bid Security of other Bidders will be retained until the Contract is awarded and the Standard Form of Agreement becomes effective; or all bids are rejected, whereupon Bid Security furnished by all such Bidders will be returned. 8 Contract Time 8 1 The number of days in which the Work is to be Substantially Completed, as set forth in the Bid Proposal form and the Standard Form of Agreement, subject to such extension of time as may be due under the terms and conditions of the Contract Documents ("Contract Time") All references to "time" or"days" shall be interpreted as consecutive calendar days. 9 Liquidated Damages and Early Completion Bonus 9 1 Provisions for liquidated damages and early completion bonus, if any, are set forth in the Standard Form of Agreement. 10 Substitute or "Or-Equal" Items 10 1 The Contract, if awarded, will be on the basis of the selected materials and equipment described in the Plans or specified in the Specifications without consideration of possible substitute or "or-equal" items. Whenever it is indicated in the Plans or specified in the Specifications that a substitute or "or-equal" item of material or equipment may be furnished or used by the Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Agreement becomes effective. All "or-equal" references shall be interpreted to mean "or approved equal" The procedure for submission of any such application by Contractor and consideration by Engineer is set forth in the Contract Documents. 11 Bid Form 11 1 The Bid Proposal form (Section 00300 — Bid Proposal) is included with the Bidding Documents when downloaded. This Document must be pnnted and signed, as required below, and then uploaded as an Attachment to the Bid. All E-bids must be submitted on the City's official E-bid System Bid Proposal document. All blanks on the Bid Proposal form must be completed or filled in. The Bidder shall bid all Alternates, if any Incomplete Bid Proposals may be cause for rejection. 11.2 Bid Proposals by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompamed be evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary 12-2014 00200-5 of 8 CITY OF PEARLAND INSTRUCTIONS.TO BIDDERS The corporate address and state of incorporation must be shown below the signature. Once executed the document is to be uploaded as an attachment to the Bid. 11.3 Bid Proposals by partnerships must be executed in the partnership name and signed by a general partner, whose title must appear under the signature, and if a corporate general partner, executed as required above for corporations and the official address of the partnership must be shown below the signature. All names must be typed or printed below the signature. Once executed the document is to be uploaded as an attachment to the Bid. 11 4 The Bidder shall acknowledge receipt of all Addenda (the number of which must be filled in on the Bid Proposal form). 11 6 The address and telephone number for communications regarding the Bid Proposal must be shown on the Bid Proposal form. 12. Submission of Bid Proposals 12.1 The place, date and/or time designated for opening Bid Proposals may be changed in accordance with applicable laws, codes and ordinances. Any such changes to the Bid Schedule shall be made by Addenda. 12.2 Electronic Bids shall be submitted per the requirements, instructions, terms and conditions as stated in the registration and submittal instructions of the City's E-bid System electronic bidding software. All Bidders utilizing this system MUST register as a potential supplier, (Bidder). E-Bids are submitted directly via the City's Web based system located at https.//pearland.ionwave.net/Login.aspx. Bid Proposals submitted after the bid date and time will be rejected. 13 Modification and Withdrawal of Bid Proposals 13 1 Prior to submission, E-bid Bid Proposals may be modified or withdrawn without prejudice. 13.2 Once submitted, Bid Proposals may only be modified by an appropriate document duly executed (in the manner that a Bid Proposal must be executed) and delivered to Office of City Purchasing, Finance Department, 2nd Floor City Hall, 3519 Liberty Drive, Pearland, Texas 77581 and submitted any time prior to the opening of Bid Proposals. 13.3 A Bidder may not modify or withdraw its Bid Proposal by facsimile or verbal means. A withdrawn Bid Proposal may be resubmitted prior to the designated time for opening Bid Proposals. No bid may be withdrawn or terminated for a period of sixty(60) days subsequent to the bid opening date without the consent of the City of Pearland. 13 4 If, within twenty-four (24) hours after Bid Proposals are opened, any Bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material mistake in the preparation of its Bid Proposal, that Bidder may request to withdraw its Bid Proposal and the bid security may be returned or, at the discretion of the Owner, Owner may make a claim against the bid security Thereafter, that Bidder will be disqualified from further bidding on the Project .to be provided under the Contract Documents. 12-2014 00200-6 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS 14 Opening of Bid Proposals 14 1 Bid Proposals will be opened and (unless obviously non-responsive) read aloud publicly An abstract of the amounts of the base Bid Proposals and major.alternates (if any) will be made available to Bidders after the opening of Bid Proposals. Bid Proposals, in their entirety, shall be open for public inspection after the contract is awarded, with the exception of any trade secrets or confidential information contained therein, provided Bidder has expressly identified any specific information contained therein as being trade secrets or confidential information. 15 Bid Proposals to Remain Subject to Acceptance 15 1 All Bid Proposals will remain subject to acceptance for sixty(60) days after the day of the Bid Proposal opening, but Owner may, in its sole discretion, release any Bid Proposal and return the bid security prior to that date. 16 Award of Contract 16 1 Owner reserves the right to reject any and all Bid Proposals, to waive any and all informalities not involving price, time or changes in the Work and to negotiate contract terms with the Successful Bidder Owner may reject a bid as non-responsive if: 1) Bidder fails to provide required Bid Security; 2) Bidder improperly or illegibly completes or fails to complete all information required by the Bidding Documents, 3) Bidder fails to sign the Bid Proposal or improperly signs the Bid Proposal, 4) Bidder qualifies its Bid Proposal, 5) Bidder tardily or otherwise improperly submits its Bid Proposal, 6) Bidder fails to submit the Qualifications of Bidder as required under section 3 of these Instructions to Bidders, or 7) Bid Proposal is otherwise non-responsive. Contracts are awarded on the basis of one of the followmg cntena. A)provision of the"Best Value" or B)Lowest Responsible Bidder 16.2 Best Value. In determining the best value for the Owner, and in determining to whom to award a contract, Owner may consider 1) purchase price; 2) reputation of the Bidder and Bidder's goods or services, 3) quality of Bidder's goods or services, 4) extent to which the goods or services meet the Owner's needs, 5) Bidder's past relationship with the Owner; 6) impact on the ability of Owner to comply with laws and rules relating to contracting with historically underutilized businesses and nonprofit organizations employing persons with disabilities, 7) total long-term cost to Owner to acquire Bidder's goods or services, 8) the Qualifications of Bidder; and 9) any other relevant cnteria specifically listed in the Bidding Documents. A contract to be awarded to the Bidder offering the Best Value may be let on either a lump sum basis or a unit cost basis dependent on the Bid Proposal format. 16.3 Lowest Responsible Bidder In determining Lowest Responsible Bidder, Owner will consider Lowest Total Bid pnce for all work including Base Bid, Extra Work and Alternates, if any, and any other cost cntena. Additional evaluation cnteria may include: the Qualifications of the Bidders, whether or not the Bid Proposals comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Proposal form or pnor to the Notice of Award. Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the 12-2014 00200-7 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. A contract to be awarded to the Lowest Responsible Bidder may be let on either a lump sum basis or a unit cost basis dependent on the Bid Proposal format. Acceptance of any and all bids may be conditioned on compliance with the requirement for attendance of the mandatory pre-bid meeting. 16 4 In either case, Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid Proposal and to establish the responsibility, qualifications and financial ability of Bidders, proposed Subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents, to Owner's satisfaction,within the Contract Time. 17 Contract Security 17 1 When the Successful Bidder delivers the executed Standard Form of Agreement to Owner, it must be accompanied by the Performance, Payment, Maintenance and Surface Correction Bonds required by the Contract Documents. Bonds may be on the forms provided herein or an equal form containing no substantive changes, as determined by Owner 18 Signing of Agreement 18 1 When Owner gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Standard Form of Agreement, and the required Performance and Payment Bond forms. Within ten (10) days thereafter Contractor shall sign and deliver the required number of counterparts of the Standard Form of Agreement to Owner with the required Bonds. Within ten (10) days thereafter, Owner shall deliver one fully signed counterpart to Contractor There shall be no contract or agreement between Owner and the Successful Bidder until proper execution and attestation of the Standard Form of Agreement by authorized representatives of the Owner 19 Pre-bid Conference 19 1 A pre-bid conference will be held as indicated in the Invitation to Bid. 20 Retamage 20 1 Provisions concerning retamage are set forth in the Contract Documents. END OF SECTION 12-2014 00200-8 of 8 CITY OF PEARLAND BID PROPOSAL Section 00300 BID PROPOSAL Part A Date- 04/04/2016 Bid of Partial's Industrial Enterprises Inc. , an individual proprietorship/a corporation organized and existing under the laws of the State of Texas/a partnership consisting of Houston, TX ,for the construction of: Liberty and Suburban Garden Ground Storage Tank Rehabilitation City of Pearland,Texas COP PN: Liberty/Garden BID NO.: 0216-23 (Submitted in Electronic format) To The Honorable Mayor and City Council of Pearland City of Pearland 3519 Liberty Drive Pearland,Texas 77581 Pursuant to the published Invitation to Bidders, and Instructions to Bidders,the undersigned Bidder hereby proposes to perform all the work and furnish all necessary superintendence,labor, machinery, equipment,tools and materials,and whatever else may be necessary to complete all the work described in or reasonably inferable from the Contract Documents for the construction of the Liberty and Suburban Garden Ground Storage Tank Rehabilitation Project with all related appurtenances, complete,tested, and operational,in accordance with the Plans and Specifications prepared by the Engineering Firm,Freese and Nichols, Inc., William(Clay) Herndon,P.E., 11200 Broadway Street, Suite 2332, Pearland,TX 77584, for the unit prices or applicable prices set forth in Exhibit"A",the electronic bid fonnri as contained in the City's E-bid system, which, once fully executed and submitted shall constitute a legal and executable proposal from the Bidder It is understood that, in the event any changes are ordered on any part of the Work, the applicable unit prices bid shall apply as additions to or deductions from the total prices for the parts of the Work so changed. The.Bid Security required under the Instructions to Bidders is included and has been uploaded as an attachment within the E-bid system and,that a fully executed, signed and sealed hard copy has been delivered to the Office of City Purchasing, Finance Department, 2nd Floor, City Hall, 3519 Liberty Drive,Pearland, Texas 77581. The Bidder agrees to submit to the Owner the Qualifications of Bidder, including the Financial Statement of Bidder, as required by the Instructions to Bidders if requested to do so as a condition of the Bid review The Bidder binds himself, upon acceptance of his proposal, to execute the Standard Form of Agreement and furnish an acceptable Performance and Payment Bond and Maintenance Bond, each in the amount of one hundred percent (100%) of the total Contract Price, according to the forms included in the Contract Documents, for performing and completing the said work within Bidder's Initial's: TS 10-2012 00300- 1 of 2 CITY OF PEARLAND BID PROPOSAL the time stated and for the prices stated in Part B of this proposal along with all required insurance in the required amounts. The undersigned Bidder agrees to commence work within 10 days of the date of a written Notice to Proceed. It is understood that the Work is to be Substantially Complete within 150 calendar days after the date Of the Notice to Proceed. Time for Substantial Completion shall begin on the date established by the Notice to Proceed. The Contractor will pay liquidated damages in the amount(s) specified in Document 00500 — Standard Form of Agreement, in the event the Work is not Substantially Complete within the Contract Time. The undersigned agrees that the amounts bid in this Bid Proposal will not be withdrawn or modified for ninety (90) days following date of Bid Proposal opemng, or such longer period as may be agreed to in writing by the City of Pearland and Bidder It is understood that t in the event the Successful Bidder fails to enter into the Standard Form of Agreement and/or to furnish an acceptable Performance and Payment Bond and Maintenance Bond, each in the amount of one hundred (100) percent of the Contract Price, along with all required insurance in the stated amounts within ten (10) days of the Notice of Award, the Successful Bidder will forfeit the Bid Security as provided in the instructions to Bidders. Unless otherwise expressly provided herein, all references to"day(s)" shall mean calendar day(s). The Bidder acknowledges that the following Addenda have been received. The modifications to the Bidding Documents noted therein have been considered and all costs thereto are included in the Bid Proposal prices. Addendum No 1 Date: 04/04/2016 Addendum No. Date: Addendum No 2 Date 04/06/2016 Addendum No . Date: Bidder hereby represents that the only person or parties interested in this offer as principals are those named. Bidder has not directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding. Firm Name: Pardalis Industrial Enterprises Inc. By- Tony Saroukos Title- President Address: 3320 Longhorn Dr Houston TX 77084 Phone No 281-579-6535 ATTEST. Tony Saroukos (Seal,if Bidder is.a Corporation) (Typed or Printed Name) Signature Date: 04/04/2016 END OF SECTION Bidder's Initial's: TS 10-2012 00300-2 of 2 CITY OFPEARLAND BID PROPOSAL EXHIBIT"A"-BID FORM Contractor Name Pardalis Industrial Enterprise Inc. Project Name Liberty and Suburban Garden Ground Storage Tank Rehabilitation Project Project No. Liberty/Garden Bid No. 0216-23 Contract Amount BASE BID ITEMS Est. Item# Spec.# Item Description Unit Quantity . Unit Price Total SECTION"A" LIBERTY GROUND STORAGE TANK A-1 01505 MOBILIZATION(MAX 3%OF SECTION) LS 1 $ 1,000.00 $ 1,000.00 PAINTING AND REHABILITATION OF GST INTERIOR FURNISH ALL MATERIALS,LABOR, A-2 09950 EQUIPMENT AND SUPERINTENDENCE FOR THE PAINTING AND REHABILITATION OF A LS 1 $ 89,500.00 $ 89,500.00 550,000-GALLON WELDED STEEL,GROUND STORAGE TANK AND APPURTENANCES,IN ACCORDANCE WITH THE CONTRACT DOCUMENTS;COMPLETE IN PLACE. A-3 13409. CAULK AROUND BASE FLANGE'ON EXTERIOR OF TANK AND SEAL FOUNDATION WITH LS 1' $ 2,250.00 $ 2,250.00 SEALANT A 4 13409 EXTEND HANDRAIL ON ROOF OF TANK. REPAIR COATINGS DAMAGED DURING LS 1 $' 2,500.00 $ 2,500.00 INSTALLATION. A-5 13409 REMOVE AND REPLACE ROOF VENT LS 1 $ 2,500.00 $ 2,500.00 A-6 13409 MODIFY EXISTING EXTERIOR LADDER TO INSTALL A'LADDER SAFETY CAGE LS 1 $ 2,700.00 $ 2,700.00 A-7 02921 SITE RESTORATION LS 1 $ 550.00 $ 550.00 SECTION"A" LIBERTY GROUND STORAGE TANK SUBTOTAL, _ SECTION"B" SUBURBAN GARDEN GROUND STORAGE TANK $101,000.00 B-1 01505 MOBILIZATION(MAX 3%OF SECTION) LS 1 $ 1,000.00 $ 1,000.00 PAINTING AND REHABILITATION OF GST INTERIOR FURNISH ALL MATERIALS,LABOR, B-2 09950 EQUIPMENT AND SUPERINTENDENCE FOR THE PAINTING AND REHABILITATION OF,A LS 1 $ 70;000.00 $ 70,000.00 428,000-GALLON BOLTED STEEL GROUND STORAGE TANK AND APPURTENANCES,IN ACCORDANCE WITH THE CONTRACT DOCUMENTS,COMPLETE IN PLACE. B 3 13409 CAULK AROUND BASE FLANGE ON EXTERIOR OF TANK AND'SEAL FOUNDATION WITH LS 1 $ 2,250.00 $ 2,250.00 SEALANT B-4 13409 EXTEND HANDRAIL ON ROOF OF TANK. LS 1 $ 2,500.00 $ 2,500.00 B-5 13409 MODIFY EXISTING EXTERIOR LADDER AND EXTEND LADDER SAFETY CAGE LS 1 $ 2,700.00 '$ 2,700.00 B-6 02921 SITE RESTORATION LS' 1 $ 550.00 $ 550.00 SECTION"B" SUBURBAN GARDEN GROUND STORAGE TANK SUBTOTAL $ 79,000.00 ' 'BASE BID-SUBTOTAL $ 180,000.00 SUPPLEMENTAL BID ITEMS Est. Item# Spec.# Item Description Unit Quantity . Unit Price Total SECTION"C"-SUPPLEMENTAL BID ITEMS G1 13409 Furnish all materials,labor equipment and appurtenances for"interior grinding" complete in place. MAN HR. 50 $ 10.00 $ 500.00 G2 13409 Furnish all materials,labor equipment and appurtenances for"seam welding' complete in place. LF 50 $, 25.00 $' 1,250.00 C 3 13409 Furnish all materials,labor equipment "and appurtenances for.pit welding",complete in place. x IN 50 $ 20.00 $' 1,000.00 C-4 13409 Fumish all materials,labor,equipment and appurtenances for"pit filling" complete in place. GAL 15 $ 25.00 $ 375.00 C-5 13409 Furnish all materials,labor,equipment and appurtenances for"additional work" complete in, place: MAN HR. 50 $ 10.00 $ 500.00 G6 13409 Furnish miscellaneous steel replacment,installed,complete in place. TN 1 $ 500.00 $ 500.00 SUPPLEMENTAL BID SUBTOTAL $ 4,125.00 BID SUMMARY 1 TOTAL BASE BID ITEMS $ 180,000.00 2 TOTAL SUPPLEMENTAL BID ITEMS $„ 4,125:00 3 TOTAL BID PRICE $ 184,125.00 00300-Al City of Pearland Texas (City of Pearland Texas) Supplier Response mid Information Contact Information Ship to Information Bid Creator Julie Blackmore Buyer Address 3519 Liberty Drive Address Email jblackmore@pearlandtx.gov Suite 201 Phone 281 (652) 1790 Pearland,TX 77581 Fax Contact Contact Bid Number 0216-23 Addendum 2 Department Department Title Liberty and Suburban Building City Hall Building Garden Road Ground 2nd Floor Storage Tank Rehabilitation Floor/Room Floor/Room Bid Type Invitation to Bid Telephone 281 (652) 1790 Telephone Issue Date 3/1 7/201 6 04:22:43 PM(CT) Fax 281 (652) 1738 Fax Close Date 4/8/201 6 10:00:00 AM(CT) Email ebids@pearlandtx.gov Email Need by Date Supplier Information Company Pardalis Industrial Enterprise Inc. Address 3320 Longhorn Houston, TX 77084 Contact Juan Torres Department Projects Building loor/Room elephone 1 (713) 2911532 Fax 1 (713) 2911532 Email pardalisindustrial@gmail.com Submitted 4/7/2016 09:20.40 AM(CT) Total $184,125.00 By submitting your response,you certify that you are authorized to represent and bind your company Signature Juan Torres Email pardalisindustrial@gmail.com Supplier Notes Bid Notes The project will entail the rehabilitation of the Liberty and Suburban Garden Road Ground Storage Tanks, including but not limited to interior coatings, handrails,vents,and ladders. Bid Activities Date Name Description 3/29/2016 10:00:00 AM Mandatory Pre-Bid Conference (CT) Bid Messages 0216-23 Addendum 2- Page 1 of 7 'lease review the following and respond where necessary Name Note Response 1 Specification Acknowledgement Bidder has reviewed specifications and agrees that their Yes bid adheres fully If not,bidder will need to provide written explanation of any exceptions. 2 Insurance Requirement Acknowledgement I have read and agree to the City of Pearland's Contractor I agree Insurance Requirements&Agreement. 3 Local Bidder Preference Claim Form Bidder claims Pearland local bidder preference,pursuant No to provisions of Local Bidder Preference claim form and Texas Local Government Code,Chapter 271.9051 4 Conflict of Interest Questionnaire I am submitting a completed and signed copy of the Yes Conflict of Interest Questionnaire. 5 Non-Collusion Statement I am submitting a completed and signed copy of the Yes Non-Collusion Statement. 6 Contractor Questionnaire I am submitting a completed and signed copy of the I agree Contractor Questionnaire. 7 Delivery/Installation Please state the anticipated delivery/installation time We would require for delivery and required for this project. installation 1 week,of notice for us to deploy all equipment and materials needed.In the case an installation must take place and the product is fromm a third authorized party,we would require at least 2 weeks notice. o Bid Security Bidder understands and has completed the following: Bid I agree Security required by Bid Specifications has been uploaded as an attachment within the E-bid system and,a fully executed,signed and sealed hard copy of the Bid Bond has been delivered to the Office of City Purchasing, Finance Department, 2nd Floor,City Hall,3519 Liberty Drive,Pearland,Texas, 77581 9 Normal Business Hours Please state your normal business hours in which 9:00 AM to 5:00 PM standard hourly rates will apply 10 Emergency Service If emergency or after hours service is required,can your Yes company respond? 11 Emergency Response Time Please state your estimated emergency response time. lmmediatelly 12 Minimum Charge per Call-Out Do you have a minimum charge per call-out for emergency Depends on the emergency (after hours)repairs? If so,please state the minimum charge. 13 Phone Number Please state the phone number that should be called 281-579-6535 during normal working hours if the City of Pearland requires service. 14 Emergency Phone Numbers Please list the phone numbers that should be called if the Tony Saroukos-832-725-7202 City of Pearland requires service after hours, on a Mario Fuentes-281-216-6837 weekend,or on a holiday Please also provide the contact name for each phone number given. Warranty for Labor/Workmanship Please state your warranty for labor/workmanship. 1 Yeas 0216-23,Addendum 2- Page 2 of 7 16 Warranty for Materials/Supplies Please state your warranty for materials/supplies. Same as Manufacturer 0216-23 Addendum 2- Page 3 of 7 Line Items # Qty UOM Description Response 1 SECTION A.Liberty Ground Storage Tank: $101,000.00 Item Notes. Supplier Notes: Package Line Items: # Qty UOM Description Response 1,1 1 LS MOBILIZATION(MAX 3%OF SECTION) 1,000.00 Item Notes: Spec.#01505 Supplier Notes: 1.2 1 LS PAINTING AND REHABILITATION OF GST INTERIOR-FURNISH ALL MATERIALS,LABOR, 89,500.00 EQUIPMENT AND SUPERINTENDENCE FOR THE PAINTING AND REHABILITATION OF A 550,000-GALLON WELDED STEEL GROUND STORAGE TANK AND APPURTENANCES; IN ACCORDANCE WITH THE CONTRACT DOCUMENTS,COMPLETE IN PLACE. Item Notes: Spec.#09950 Supplier Notes: 1.3 1 LS CAULK AROUND BASE FLANGE ON EXTERIOR OF TANK AND SEAL FOUNDATION WITH 2,250.00 SEALANT Item Notes: Spec.#13409 Supplier Notes: 1 4 1 LS EXTEND HANDRAIL ON ROOF OF TANK. REPAIR COATINGS DAMAGED DURING 2,500.00 INSTALLATION. Item Notes: Spec.#13409 Supplier Notes: 1.5 1 LS REMOVE AND REPLACE ROOF VENT 2,500.00 Item Notes: Spec.#13409 Supplier Notes: 1.6 1 LS MODIFY EXISTING EXTERIOR LADDER TO INSTALL A LADDER SAFETY CAGE 2,700.00 Item Notes: Spec.#13409 Supplier Notes: 0216-23'Addendum 2- Page 4 of 7 1 7 1 LS SITE RESTORATION 550.00 Item Notes: Spec.#02921 Supplier Notes: 2 1 SECTION B.SUBURBAN GARDEN GROUND STORAGE TANK $79,000.00 Item Notes. Supplier Notes: Package Line Items: # Qty UOM Description Response 2.1 1 LS MOBILIZATION (MAX 3%OF SECTION) 1,000.00 Item Notes: Spec.#01505 Supplier Notes: 2.2 1 LS PAINTING AND REHABILITATION OF GST INTERIOR-FURNISH ALL MATERIALS,LABOR, 70,000.00 EQUIPMENT AND SUPERINTENDENCE FOR THE PAINTING AND REHABILITATION OF A 428,000-GALLON BOLTED STEEL GROUND STORAGE TANK AND APPURTENANCES, IN ACCORDANCE WITH THE CONTRACT DOCUMENTS,COMPLETE IN PLACE. Item Notes: Spec.#'09950 Supplier Notes: 2.3 1 LS CAULK AROUND BASE FLANGE ON EXTERIOR OF TANK AND SEAL FOUNDATION WITH 2,250.00 SEALANT Item Notes: Spec.#13409 Supplier Notes: 2.4 1 LS EXTEND HANDRAIL ON ROOF OF TANK. 2,500.00 Item Notes: Spec.#13409 Supplier Notes: 2.5 1 LS MODIFY EXISTING EXTERIOR LADDER AND EXTEND LADDER SAFETY CAGE 2,700.00 Item Notes: Spec.#13409 Supplier Notes: 0216-23,Addendum 2- Page 5 of 7 2.6 1 LS SITE RESTORATION 550.00 Item Notes: Spec.#02921 Supplier Notes: 3 1 PKG SUPPLEMENTAL BID ITEMS $4,125.00 Item Notes. Supplier Notes: Package Line Items: # Qty UOM Description Response 3.1 50 MAN HR Furnish all materials,labor, equipment and appurtenances for"interior grinding",complete in 10.00 place. Item Notes: SPEC.#13409 Supplier Notes: 3.2 50 LF Furnish all materials,labor, equipment and appurtenances for"seam welding",complete in 25.00 place. Item Notes: SPEC. #13409 Supplier Notes: 3.3 50 IN2 Furnish all materials,labor; equipment and appurtenances for"pit welding",complete in place. 20.00 Item Notes: SPEC.#13409 Supplier Notes: 3.4 15 GAL Furnish all materials,labor, equipment and appurtenances for"pit filling", complete in place. 25.00 Item Notes: SPEC.#13409 Supplier Notes: 3.5 50 MAN HR. Furnish all materials,labor, equipment and appurtenances for"additional work",complete in 10.00 place. Item Notes: SPEC. #13409 Supplier Notes: 0216-23 Addendum 2- Page 6 of 7 3.6 1 TN Furnish miscellaneous steel replacement, installed,complete in place. 500.00 Item Notes: SPEC. #13409 Supplier Notes: Response Total: $184,125.00 0216-23 Addendum 2- Page 7 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT Section 00500 STANDARD FORM OF AGREEMENT THIS AGREEMENT is by and between City of Pearland(hereinafter called OWNER or City) and PARDALIS INDUSTRIAL ENTERPRISES, INC. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows Article 1 WORK CONTRACTOR shall complete all work as specified or indicated in or reasonably inferable from the Contract Documents (hereinafter the "Work"). The Work is generally described as follows. Liberty and Suburban Garden Ground Storage Tank Rehabilitation City of Pearland,Texas COP PN: Liberty/Garden BID NO.: 0216-23 Article 2. ENGINEER The Work has been designed by Freese and Nichols, Inc., William (Clay) Herndon, P.E., 11200 Broadway Street, Suite 2332, Pearland, TX 77584 who is heremafter called ENGINEER and who is to assume all duties and responsibilities and have the nghts and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3 CONTRACT TIME 3 1 The Work will be Substantially Complete (as defined in Article 1 of the General Conditions) within 180 calendar days (including weekends and holidays) from the date when the Contract Time commences to run as provided in paragraph 5 01 of the General Conditions (as revised in the Special Conditions if applicable), and completed and ready for Final Payment within 210 calendar days from the date when the Contract Time commences to run. No work will be allowed on Sundays. 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3 1 above, plus any extensions thereof allowed in accordance with Article 5 of the General Conditions. OWNER and CONTRACTOR also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration preceding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER five hundred dollars $500 00 for each day that expires after the time specified in paragraph 3 1 4-2015 00500- 1 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time set out in the Certificate of Substantial Completion or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER five hundred dollars $500 00 for each day that expires after the time specified in the Certificate of Substantial Completion for completion and readiness for Final Payment. 3.3 Inspection Time. Working hours for the Pearland Inspection personnel are from 7 30 a.m. to 4.30 p.m., Monday through Friday, excluding City approved holidays. The Contractor shall notify the OWNER of any required inspection overtime work at least 48 hours in advance and shall pay the overtime wages for the required City inspections. Article 4 CONTRACT PRICE 41 OWNER shall pay CONTRACTOR for completion of the Work in strict accordance with the Contract Documents in current funds $ 184,125.00 (the"Contract Price"). The Contract Price includes the Base Bid , and Extra Work Bid Items as shown in Document 00300—Bid Proposal. Article 5 PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Section 6 0 "Measurement and Payment" of the General Conditions. Application for Payment will be processed by ENGINEER as provided in the General Conditions. 5 1 Progress Payments. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER as provided below All progress payments will be on the basis of the progress of the Work and actual quantity of Work completed, in accordance with Article 6 "Measurement and Payment" of the General Conditions. 5 1 1 Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage or actual quantity of Work complete, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with the General Conditions. The OWNER shall make payment within 30 days of receipt of application for payment by the ENGINEER. 5 1.2 Each progress payment shall be less retamage as specified in Paragraph 6 06 of the General Conditions, and further less all previous payments and all further sums that may be retained by the OWNER under the terms of this Agreement. It is understood, however, that in case the whole work be near to completion and some unexpected and unusual delay occurs due to no fault or neglect on the part of the CONTRACTOR, the OWNER may upon written recommendation of the ENGINEER pay a reasonable and equitable 4-2015 00500-2 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT portion of the retained percentage to the CONTRACTOR, or the CONTRACTOR at the OWNER's option, maybe relieved of the obligation to fully complete the Work and, thereupon, the CONTRACTOR shall receive payment of the balance due him under the contract subject only to the conditions stated under"Final Payment." 5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 6 09 of the General Conditions, OWNER shall pay the remainder of the Contract Pnce as recommended by ENGINEER as provided in said paragraph 6.09 Article 6 INTEREST Interest on any overdue payment from OWNER to CONTRACTOR shall be paid in accordance with the provisions of Chapter 2251 025 of the Texas Government Code, as amended. Article 7 CONTRACTOR'S REPRESENTATIONS In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations. 7 1 CONTRACTOR has familianzed himself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. 7.2 CONTRACTOR has studied carefully all available surveys, assessments, reports of explorations, investigations, and tests of subsurface conditions and drawings of physical conditions of the site. Such technical reports and drawings are not Contract Documents, and Owner makes no representations or warranties as to the accuracy of such documents or information, or to whether or not they are complete, comprehensive, or all-inclusive. 7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraphs 7.2 above) which pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work, and CONTRACTOR assumes the risk of such subsurface and physical conditions, and shall furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, and no additional examinations, investigations, explorations,tests,reports, and studies or similar information or data are or will be required by CONTRACTOR for such purposes. 7 4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract documents with respect to existing underground facilities at or contiguous to the site and assumes responsibility for the accurate location of 4-2015 00500-3 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT said underground facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said underground facilities are or will be required by CONTRACTOR in order to perform and finish the Work at the Contract.Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents. 7.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, explorations, tests,reports, and studies with the terms and conditions of the Contract Documents. 7 6 CONTRACTOR has given ENGINEER wntten notice of all conflicts, errors or discrepancies in the Contract Documents of which Contractor knew or should have known, and CONTRACTOR shall perform the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including any wntten resolution of any such conflict, error or discrepancy by ENGINEER. In the event of a conflict that was not brought to the OWNER'S or ENGINEER's attention pnor to the bid, the CONTRACTOR is assumed to have bid the most expensive alternative. Article 8. CONTRACT DOCUMENTS The Contract Documents, which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work, consist of the following, each of which are incorporated herein by reference: 8 1 Standard Form of Agreement(Section 00500). 8.2 Performance, Payment, and/or Maintenance Bonds (Sections 00610, 00611, and 00612) 8.3 General Conditions of Agreement (Section 00700), including Attachment No 1 Workers' Compensation Insurance Coverage, Attachment No 2 Agreement for Final Payment and Contractor's Sworn Release, and Attachment No 3 Owner's Insurance Requirements of Contractor 8 4 Special Conditions of Agreement(Section 00800). 8.5 Plans, consisting of sheets numbered 1 through 4 inclusive with attachments with each sheet beanng the following general title: Liberty and Suburban Garden Ground Storage Tank Rehabilitation. 8 6 Instructions to Bidders and CONTRACTOR's Bid Proposal, including any Addenda referenced therein. 8 7 Technical Specifications for the Work. 8 8 The following, which may be delivered or issued after this Agreement becomes effective: Any Change Orders or other documents amending, modifying, or supplementing the Contract Documents in accordance with the General Conditions. 4-2015 00500-4 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT There are no Contract Documents other than those listed above in this Article 8 The Contract Documents may only be amended,modified or supplemented as provided in the General Conditions. Article 9 MISCELLANEOUS 9 1 Terms used in this Agreement which are defined in Section 1, "Definitions and Interpretations" of the General Conditions will have the meanings indicated in the General Conditions. 9.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound, and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representative to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants,, agreements and obligations contained in the Contract.Documents. 9 4 CONTRACTOR agrees to warranty the Work for a period of one (1) year from Substantial Completion against defects in materials and workmanship CONTRACTOR agrees to repair or replace any defective work within this warranty period immediately unless such repairs require long lead time materials and equipment in which case CONTRACTOR shall provide an agreeable schedule for repairs at no additional cost to OWNER. 9.5 The Work will be completed according to the Contract Documents and in accordance with codes, ordinances, and construction standards of the City of Pearland, and all applicable laws, codes and regulations of governmental authorities. 9 6 In the event any notice period required under the Contract Documents is found to be shorter than any minimum period prescribed by applicable law,the notice period required shall be construed to be the minimum period prescribed by applicable law 9 7 This Contract and the Contract Documents, insofar as they relate in any part or in any way to the Work undertaken therein, constitute the entire agreement between the parties hereto, and it is expressly understood and agreed that there are no agreements or promises by and between said parties, except as aforesaid, and that any additions thereto or changes shall be in writing. 9 8 The provisions of this Contract shall be applied and interpreted in a manner consistent with each other so as to carry out the purposes and the intent of the 4-2015 00500-5 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT parties, but if for any reason any provision is unenforceable or invalid, such provisions shall be deemed severed from this Contract and the remaining provisions shall be earned out with the same force and effect as if the severed provision had not been part of this Contract. 9 9 The headings of the paragraphs are included solely for the convenience of reference and if there is any conflict between the headings and the text of this Contract, the Contract text shall control. 9 10 The waiver of any breach hereof shall not constitute a waiver of any subsequent breach of the same or any other provision hereof. Failure by the OWNER in any instance to insist upon observance,or performance by CONTRACTOR shall not be deemed a waiver by CONTRACTOR of any such observance or performance. No waiver will be bindmg upon OWNER unless in writing and then will be for the particular instance only Payment of any sum by OWNER to CONTRACTOR with knowledge of any breach or default will not be deemed a waiver of such breach or default or any other breach or default. 9 11 The CONTRACTOR acknowledges that the OWNER(through its employee handbook)considers the following to be misconduct that is grounds for termination of an employee of the OWNER. Any fraud, forgery,misappropriation of funds, receiving payment for services not performed or for hours not worked,mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the OWNER. The CONTRACTOR agrees that it will not,,directly or indirectly; cause an employee of the OWNER to engage in such misconduct. 9 12 The CONTRACTOR agrees to comply with Appendix A(attached) of the City of Pearland's Title VI Nondiscrimination Plan Assurances. 4-2015 00500-6 of 7 CHT OF PEARLAND STANDARD FORM OF AGREEMENT IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to OWNER and one to CONTRACTOR. This Agreement will be effective upon execution and attestation by authorized representatives of the City of Pearland and upon the following date: , 20 OWNER. CONTRACTOR CITY OF P P AN PARDALIS INDUSTRIAL ENTERPRISES, INC By- By TONY SAROIJKOS Title: Title: PRESIDENT Date. 1- i6—/ Date. (Corporate Seal) ATTEST ATI EST AKI PLATIS ' Address for giving notices 3320 LONGHORN DRIVE HOUSTON, TEXAS 77084 4, pardalisindustrial@gmail.com ... N 1%00 Phone. _281-579-6535 Fax. 281-646-0039 Agent for service of process. AKI PLATIS 832-279-0703 END OF SECTION 4-2015 00500-7 of 7 Title VI Nondiscrimination Assurances APPENDIX A During the- performance of this contract, the contractor, for itself, its assignees and successors in interest (hereinafter referred to as the"contractor") agrees as follows: (1) Compliance with Regulations: The contractor shall comply with the Regulations relative to nondiscrimination in Federally-Assisted programs of the Department-of Transportation (hereinafter, "Dory Title 49, Code of Federal Regulations, Part 21, as they may .be amended from time to time, (hereinafter referred to as the Regulations), which are.herein incorporated by reference and made a part of.this .contract (2) 'Nondiscrimination The contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment The contractor shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations,including employment.practices when the contract.covers.a program. set forth in Appendix B of the Regulations. (3) Solicitations for Subcontracts, including Procurements of Materials and Equipment. .( :In all solicitations. either by competitive bidding: or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each: potential subcontractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations .relative to .nondiscrimination on the grounds .of: race, color, or national origin (4) Information and Reports: The contractor shall provide all information and reports required by'the:Regulations or directives issued_pursuant thereto, and:shall permit access to its books,records, accounts, other sources of information, and its facilities as may be determined by the Sub-Recipient-or the Federal Highway Administration to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to-furnish this information the contractor shall so certify to the Sub-Recipient, or the Federal Highway Administration as appropriate, and:shall set forth what efforts it has made to obtain the information (5) Sanctions for Noncompliance. In the event of the contractors noncompliance with the nondiscrimination provisions.of this contract,the:Sub-Recipient shall impose such contract sanctions as it or the Federal Highway Administration may determine to be appropriate, including, but not limited to. (a) withholding. of payments to the contractor under the contract until the contractor complies, and/or (b) cancellation, termination or suspension.of the contract, in whole or in.part (6) Incorporation of Provisions:The contract include the provisions of paragraphs (1) through (6) in every subcontract,:including procurements of materials and leases of equipment, Unless exempt by the Regulations,. or directives -issued pursuant thereto The_contractor shall take such action with respect to any.subcontract or procurement as the Sub-Recipient or the Federal Highway Administration .may direct as a means .of 'enforcing such provisions including sanctions for non-compliance. Provided, however, that,.in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result:of such direction, the contractor may request the Sub-Recipient to enter into such litigation to protect the interests of the Sub-Recipient, and,in addition,the contractor may request the United States to enter into such litigation to protect the interests of the United States. i ENDURANCE AMERICAN INSURANCE COMPANY PERFORMANCE BOND Bond No. EAIC961700003 (hereinafter the"Bond") KNOW ALL MEN BY THESE PRESENTS That we,the undersigned,_PARADALIS Industrial Enterprises, Inc., as Principal, and Endurance American Insurance Company, with its home office at 750 Third Avenue,New York,New York 10017, a corporation organized and existing under and by virtue of the laws of the State of Delaware, and duly authorized to transact business in the State of Texas, as Surety, are held and firmly bound,jointly and severally, with our heirs, executors, administrators, successors and assigns,unto City of Pearland, having an address of 3519 Liberty Drive, Pearland, TX 77581 (hereinafter referred to as"Obligee"), in the penal sum of One Hundred Eighty Four Thousand One hundred twenty-five and 00/100($ 184,125 00) (hereinafter referred to as "Penal Sum"), for the performance of the Contract incorporated herein by reference, contingent upon all of the terms, conditions and limitations set forth herein. SIGNED and sealed this day of , 20_ THE CONDITION OF THE ABOVE OBLIGATION IS SUCH THAT, WHEREAS,the above named Principal did on the day of , 20_, enter into a written contract with the Obligee for Liberty and Suburban Garden Ground Storage Tank Rehabilitation(hereinafter"the Contract") NOW, if the said Principal shall well and faithfully do and perform the things agreed by Principal to be done and performed according to the terms of the said Contract,the Surety and Principal shall have no obligation under this bond, except to participate in duly noticed conferences as provided in paragraph 1(a), and this obligation shall be void, otherwise, the same shall remain in full force and effect, it being expressly understood and agreed that this undertaking shall be for the benefit of the Obligee herein only and that the total liability of the Surety hereunder shall in no event exceed the Penal Sum of this obligation as herein stated. 1 The Surety shall have no obligations to the Obligee under this bond if there is an Obligee Default. If there is no Obligee Default,the Obligee having performed all of its obligations under the Contract, and the Obligee contends that there is a Principal Default,the Surety's obligation to the Obligee under this bond shall arise only after a) The Obligee has notified the Principal and the Surety at its address set forth above that the Obligee is considering declaring a Principal Default and has requested and attempted to arrange a conference with the Principal and the Surety to be held not later than fifteen(15) days after receipt of such notice to discuss methods of performing the Contract. If the Obligee,the Principal and the Surety agree,the Principal shall be allowed a reasonable time to perform the Contract,but such Endurance American Insurance Company WS-1190740-0811 agreement shall not waive the Obligee's right, if any, subsequently to declare a default; b) The Obligee has declared a Principal Default and formally terminated the Principal's right to complete the Contract in accordance with the terms of the Contract. Such default and termination shall not be declared earlier than twenty (20) days after the Principal and the Surety have received notice from the Obligee as provided in subparagraph(a) above; and c) The Obligee has agreed in writing to pay the Balance of the Contract Price to the Surety in accordance with the terms of the Contract or to a contractor selected by Surety to perform the Contract in accordance with the terms of the Contract. 2. When the Obligee has satisfied all of the conditions of subparagraphs (a)through (c) of the preceding paragraph 1,the Surety shall promptly and at the Surety's expense take one of the following actions. a) Arrange for the Principal, with consent of the Obligee,to perform and complete the Contract; b) Undertake to perform and complete the Contract itself; through its agents or through independent contractors, c) Obtain bids or negotiated proposals from contractors acceptable to the Obligee for a contract for performance and completion of the Contract, arrange for a contract to be prepared for execution between the Obligee and the contractor to be secured with performance and payment bonds executed by the new contractor and a qualified surety in a form and amount equivalent to the bonds issued by Surety in connection with the Contract, and pay to the Obligee the difference between the price of the new contract and the Balance of the Contract Price, or d) Waive its right to perform and complete, arrange for completion, or obtain a new contractor, and with reasonable promptness under the circumstances i. After investigation, determine the amount for which it may be liable to the Obligee, subject to all of the limitations as set forth herein and in particular subparagraph 2(c) above, and as soon as practicable after the amount is determined, tender payment of that amount to the Obligee; or ii. Deny liability in whole or in part and notify the Obligee citing reasons therefor 3 Surety's liability to Obligee hereunder is limited to the reasonable cost of completion of the Contract in excess of the Balance/of the Contract Price, and Surety shall not be liable for any other claims, costs, losses or expenses of Obligee or any other party of any nature whatsoever 2 Endurance American Insurance Company WS-1190740-0811 4 , Obligee agrees that amounts owed by Obligee to the Principal under the Contract shall be used for the performance of the Contract and to pay valid claims by subcontractors, suppliers and/or others providing labor, materials and/or equipment to or on behalf of the Principal in the performance of the Contract. By the Principal furnishing and the Obligee accepting this bond,they each agree that all funds earned by the Principal in the performance of the Contract are dedicated to satisfy the obligations of the Principal and Surety under this bond. The Obligee further agrees that Surety shall not be liable to Obligee or others for obligations of the Principal that are unrelated to the Contract, and that the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations or by any other claims of Obligee or others. 5 The Obligee agrees that any and all payments issued by the Surety in connection with this bond, whether to Obligee,to or on behalf of Principal and/or in furtherance of the performance or satisfaction of Surety's obligations hereunder in any way(including but not limited to costs and expenses incurred in undertaking or arranging to perform any work under or in connection with the Contract), are to be credited against and reduce the Penal Sum of the bond. Further, Obligee hereby waives notice of the Surety's issuance, undertaking or agreement to issue any such payment(s) and/or incur any such costs and Obligee covenants and agrees that the Surety may cease any and all work,payments or other performance hereunder of any kind whatsoever at any time that the Penal Sum of the bond has been reached or that the Surety deems the Penal Sum will be reached due to obligations incurred by the Surety(whether or not payment has been issued therefore), all without any requirement of prior notice to Obligee, and that any and all further obligations of Surety hereunder shall thereupon be deemed fully and unconditionally discharged. 6 No suit or action shall be commended hereunder by Obligee a) Until after the expiration of one (1) year following the date on which Principal ceased work on said Contract or Obligee declared Principal in default, whichever occurs first, it being understood, however, that if any limitation embodied in this bond is prohibited by any law controlling the construction hereof, such limitation shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law; and b) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state in which the project, or any part thereof, is situated, or in the United States District Court for the District in which the project, or any part thereof, is situated, and not elsewhere. 7 No right of action shall accrue on this bond to or for the use of any person or corporation other than the Obligee named herein or the heirs, executors, administrators or successors of the Obligee. 3 Endurance American Insurance Company WS-1190740-0811 8 Definitions a) Balance of the Contract Price The total amount payable by the Obligee to Principal under the Contract after all proper adjustments have been made, including allowance to Principal of any amounts received by the Obligee in settlement of insurance or,other claims for damages to which the Principal is entitled, reduced by all'valid and proper payments made to or on behalf of the Principal under the Contract. b) Contract: The agreement between the Obligee and the Principal identified on the signature page, including all Contract Documents and changes thereto c) Contract Documents. All the documents that comprise the agreement between the Obligee and the Contractor d) Prmcipal Default: Material breach by the Principal,which has neither been remedied nor waived, of its obligation to perform or otherwise to comply with the terms of the Contract. e) Obligee Default: Failure of the Obligee, which has neither been remedied nor waived,to pay the Principal as required by the Contract or material breach of its obligation to perform, complete or comply with the other terms of the Contract or hereof. 9 Any notices to the Surety or the Principal or the Obligee shall be mailed or delivered to the address for each shown below Principal. Company. PARADALIS Industrial Enterprises, Inc. Address 3320 Longhorn, Houston, TX 77084 Attest: Signature Surety:Endurance American Ins s oA Address 750 Third Ave, 2d looi ` - New York,New York 10017 — _ _ MAttest: Signature: �� - Attorney-In-Fact , , ' 4 Endurance American Insurance Company WS-1190740-0811 ENDURANCE AMERICAN INSURANCE COMPANY LABOR AND MATERIAL PAYMENT BOND Bond No. EAIC961700003 (hereinafter the "Bond") KNOW ALL MEN BY THESE PRESENTS That we,the undersigned, PARADALIS Industrial Enterprises, Inc., as Principal, and Endurance American Insurance Company, with its home office at 750 Third Avenue,New York,New York 10017, a corporation organized and existing under and by virtue of the laws of the State of Delaware, and duly authorized to transact business in the State of Texas, as Surety, are held and firmly bound,Jointly and severally,with our heirs, executors, administrators, successors and assigns unto City of Pearland,having an address of 3519 Liberty Drive,Pearland, TX 77581 (hereinafter referred to as "Obligee") in the penal sum of One Hundred Eighty Four Thousand One hundred twenty-five and 00/100 $(184,125 00) dollars (hereinafter referred to as "Penal Sum"), for the payment of all Labor,materials and equipment furnished for use in the performance of the Contract, contingent upon all of the terms, conditions and limitations hereof. SIGNED and sealed this day of , 20_ THE CONDITION OF THE ABOVE OBLIGATION IS SUCH THAT, WHEREAS,the above named Principal did on the day of , 20_enter into a written contract with the Obligee for Liberty and Suburban Garden Ground Storage Tank Rehabilitation(hereinafter "the Contract") NOW, if the said Principal shall pay all valid and adequately documented claims asserted by Claimants as defined herein,we agreeing and assenting that this undertaking shall be for the benefit of such Claimants, then the Surety and Principal shall have no obligations under this Bond and this obligation shall be void, otherwise, the same shall remain in full force and effect, it being expressly understood and agreed that the total liability of the Surety hereunder shall in no event exceed the Penal Sum of this obligation as herein stated. The Obhgee agrees that any and all payments issued by the Surety under this Bond are to be credited against the Penal Sum of the Bond. 1 The Surety shall have no obligation to Claimants under this Bond unless and until. a) Claimants who are employed by or have a direct contract with the Principal shall have given written notice to Surety,the Principal and the Obligee, above named, stating that a claim is being made under this Bond and stating with substantial accuracy the amount of such claim. Such notice shall be served by mailing the same by registered or certified mail,postage prepaid, in an envelope addressed to the Prmcipal, Obligee or Surety, as the case may be, at the address stated for each herein, or Endurance American Insurance Company WS-1190712-0811 b) Claimants, other than one having a direct contract with the Principal, shall have given written notice to the Principal,the Obligee, and the Surety above named, within ninety(90) days after such Claimant did or performed the work or Labor, and/or furnished the materials and/or equipment for which said claim is made, stating with substantial accuracy the amount claimed and the name of the party to whom the materials and/or equipment were furnished, and/or for whom the work or Labor was done or performed. Such notice shall be served by mailmg the same by registered or certified mail,postage prepaid, in an envelope addressed to the Principal, Obhgee or Surety, as the case may be, at the address stated for each herein. 2. No suit or action shall be commenced hereunder by any Claimant: a) Unless, and until, no sooner than forty-five (45) days after, Claimant has served notice to Surety, Principal and Obligee as required in the preceding paragraph, b) Until after the.expiration of one (1)year following the date upon which the Claimant last performed work or furnished materials under said contract, it being understood,however, that if any limitation embodied in this Bond is prohibited by any law controlling the construction hereof such limitation shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law; and c) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state in which the project, or any part thereof, is situated, or in the United States District Court for the District in which the project, or any part thereof, is situated, and not elsewhere. 3 Obligee agrees that amounts owed by Obligee to the Principal under the Contract shall be used for the performance of the Contract and to pay valid claims by subcontractors, suppliers and/or others providing Labor, materials and/or equipment to or on behalf of the Principal in the performance of the Contract. By the Principal furnishing and the Obligee acceptmg this Bond, they each agree that all funds earned by the Principal in the performance of the Contract are dedicated to satisfy the obligations of the Principal and Surety under this Bond. 4 The Obligee agrees that Surety shall not be liable to Obligee or others for obligations of the Principal that are unrelated to the Contract, and that the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations or by any other claims of Obligee or others. 5 The Obligee shall not be liable for payment of any costs or expenses of any Claimant under this Bond and Obligee shall have no obligation to make payments to, give notices on behalf of, or otherwise have any obligations to Claimants under this Bond. 2 Endurance American Insurance Company WS-1190712-0811 6 Upon request by any person or entity appearing to be a potential Claimant under this Bond,the Obligee shall promptly furnish a copy of this Bond or permit a copy to be made by the potential Claimant. 7 Definitions a) Balance of the Contract Price The total amount payable by the Obligee to Principal under the Contract after all proper adjustments have been made, including allowance to Principal of any amounts received by the Obligee in settlement of insurance or other claims for damages to which the Prmcipal is entitled, reduced by all valid and proper payments made to or on behalf of the Principal under the Contract. b) Contract: The agreement between the Obligee and the Contractor identified herein, including all Contract Documents and changes reasonably foreseeable thereto c) Contract Documents All the documents that comprise the agreement between the Obligee and the Contractor d) Claimant: An individual or entity having a direct contract with the Principal or with a subcontractor of the Principal to furnish Labor,materials and/or equipment for use directly in the performance of the Contract. The term"Claimant" also includes any individual or entity that has rightfully asserted a claim under an applicable mechanic's lien or similar statute against the real property upon which the Project is located. The intent of this Bond shall be to include without limitation in the terms Labor,materials and/or equipment that part of water, gas, power, light,heat, oil, gasoline,telephone service or rental equipment used in the Contract, architectural and engineering services required for performance of the work of the Principal and the Principal's subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the Labor, materials or equipment were furnished. e) Labor Net wages only due and owing for work directly required m the performance of the Contract, and shall not be deemed to include umon dues, fringe benefit or similar contributions, employee withholding taxes (or any other taxes), bonuses, or any other form of compensation or remuneration whatsoever 3 Endurance American Insurance Company WS-1190712-0811 Company. PARADALIS Industrial Enterprises, Inc. Address 3320 Longhorn, Houston, TX 77084 Attest: Signature: Surety:Endurance American Insur Address 750 Third Ave, 2nd oor New York,New York 10017 Attest: Signature. __ Attorney-In-Fact , 4 Endurance American Insurance Company WS-1190712-0811 ENDURANCE AMERICAN INSURANCE COMPANY EAIC961700005 Seal Number.95 POWER OF ATTORNEY 7(now altNen 6y these Presents,that ENDURANCE AMERICAN INSURANCE COMPANY,a Delaware corporation(the'Corporation'),with offices at 750 Third Avenue,New York,New York 10017,has made,constituted and appointed and by these presents,does maker constitute and appoint MICHAEL T SIEGELER TERESA S.MUNIZ,KRISTINA M.MATTHIJETZ its true and lawful Attorney(s)-in-fact,at GIDDINGS in the State of TX and each of them to have full power to act without the other or others,to make,execute,seal and deliver for and on its behalf bonds,undertakings or obligations in surety or co-surety with others,also to execute and deliver on its behalf renewals,extensions,agreements,waivers,consents or stipulations relating to such aforesaid bonds,undertakings or obligations provided,however,that no single bond or undertaking so made,executed and delivered shall obligate the Corporation for any portion of the penal sum thereof in excess of the sum of TEN MILLION Dollars($10,000,000.00). Such bonds and undertakings for said purposes,when duly executed by said attomey(s)-in-fact,shall be binding upon the Corporation as fully and to the same extent as if signed by the President of the Corporation under its corporate seal attested by its Corporate Secretary.5 This appointment is made under and by authority of certain resolutions adopted by the Board of Directors of the Corporation by unanimous written consent on the 21 r day of July 2011,a copy of which appears below under the heading entitled'Certificate' 5 This Power of Attorney Is signed and sealed by facsimile under and by authority of the following resolution adopted by the Board of Directors of the Corporation by unanimous written consent on the 21s'day of July,2011 and said resolution has not since been revoked,amended or repealed: RESOLVw„il ),jn granting powers of attorney pursuant to certain resolutions adopted by the Board of Directors of the Corporation by unanimous written consent on the,21. �a}t;Qf?JS�y, Q7,1,the signature of such cDrectors and officers and the seal of the Corporation may be affixed to any such power of attorney Qf p I iCa- el tuf;thereto by facsimile,and any such power of attorney or certificate bearing such facsimile signature or seal shall be valid and binding 3poP Corpo rr ite,future with respect to any bond or undertaking to which it is attached. 11, This PoWBf�,3f Attome fialLepire arirrdatlauthority hereunder shall terminate without notice at 12:01 am.(Standard Timer where said attomey(s)-in-fad is authorized to act.) JANUAR r'11ST 201719% f5 IN WITNE$,f OF th Q� �` gr{io'riQn has caused these presents to be duly signed and its corporate seal to be hereunto affixed and attested this 1ST day of FEBRUARY,2016 at New York, New York. A w -,4 ," (Corporate Seal a '" ENDURANCE AMERICAN INSURANCE COMPANY ,,,,,,,,,,,,,,,,,,, ATTEST By Richard M.Appel,Senior Vice President Brian Beggs,Executive Vice President - 'TATE OF NEW YORK ss:MANHATTAN OUNTY OF NEW YORK On the 1ST day of FEBRUARY 2016 before me personally came LYNNE MOYER to me known,who being by me duly sworn,dd depose and say that(s)he resides in NEW YORK,NEW YORK that (s)he is a SENIOR 1{IG6 PRF,SIDENT of ENDURANCE AMERICAN INSURANCE COMPANY,the corporation described in and which executed the above instrument;that(s)he knows the seal of said corpotaton'`(illthpLspaiked to said instrument is such corporate seal;that it was to affixed by order of the Board of Directors Of said corporation,and that(s)he Signed his(her)name thereto (by like order. - ,,. O�,r ((Notarial-See tk �0 y C am, �}y'f ) (a----,- - Oi/R6261371 - M. �C .�_ �c. a-J OVA LIFlE0'IN - Maria Linares(Arroyo),Notary Public-My Commission Expires:February 23,2017 - VF5TCIts'itiA(xa(.R \ - - ' 021111017 . CERTIFICATE STATE OFJVIRW YXLI G st r.,,.MANHATTAN COUNTY OF,yVA150EAt I,Doug Warman,the Chief Executive Officer of ENDURANCE AMERICAN INSURANCE COMPANY,a Delaware Corporation(the'Corporation'),hereby certify 1. That the original power of attorney of which the foregoing is a copy was duly executed on behalf of the Corporation and has not since been revoked,amended or modified;that the undersigned has compared the foregoing copy thereof with the original power of attorney,and that the same is a true and correct copy of the original power of attorney and of the whole thereof, 2. The following are resolutions which were adopted by the Board of Directors of the Corporation by unanimous written consent on the 21 s'day of July,2011 and said resolutions have not since been revoked,amended or modified: 'RESOLVED,that each of the Indviduals named below Is authorized to make,execute,seal and deliver for and an behalf of the Corporation any and all bonds,t r denakings or obli6at,ons in surety or co-surety with others and to execute and deliver for and on behalf of the Corporation renewals,extensions,agreements,waivers,consents or stipulations relating to such-aforesaid bonds, undertakings or obligations: RICHARD M.APPEL,LYNNE MOYER — — - - And _ - - r SWUM,,,, RESOLVED FLIRT E of�he individuals named above is authorized to appoint attorneys-in-fact for the purpose of making,executing,sealing and delivering bonds;undertakings or obligations iI:intirpt.otki ret.f`if�atld on behalf of the Corporation. P 3. The upd� iggneddffurther certifI tt�tzine above resolutions are true and correct copies of the resolutions as so recorded and of the whole thereof. ICJ' -'""NITNFS WHERE �Dave hereuritoet my hand and affixed the corporate seal this day of ,20 (Corporate SOI I• -o �� * 1-ey' Doug Worman,Chief Executive Officer of U.S.Insurance Any reproductions are void. r CITY OF PEARLAND ONE-YEAR MAINTENANCE BOND Section 00612 ONE-YEAR MAINTENANCE BOND STATE OF TEXAS COUNTY OF BRAZORIA § ( I 1CG`\,Q I rlODL)o KNOW ALL MEN BY THESE PRESENTS That Pcxjr2 5 ,yU1 le i of the City of uthe , Countyof 1}tLW i`� i "Sr'ate e , principal, and ehak,U1 C.-F., Arfleiti C c' ti"c C.0 authonzed under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee (Owner), m the penal sum of$ it6t4 ti ��-�,fak for the payment whereof, the said Principal and Surety bmd themselves, and their heirs, administrators, executors, successors, and assigns,jointly and severally, by these presents WHEREAS, the Principal has entered into a certain written contract with the Owner, effective as of the day of , 20 , (the "Contract") to commence and complete the construction of certain improvements described as follows. Liberty and Suburban Garden Ground Storage Tank Rehabilitation City of Pearland,Texas COP PN: Liberty/Garden BID NO.: 0216-23 which Contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Pnncipal shall faithfully correct all such work not in accordance with the Contract Documents discovered within the one-year period from the date of substantial completion,then this obligation shall be void, otherwise to remam m full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined m accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder 07/2006 00612- 1 of 2 CITY OF PEARLAND ONE-YEAR MAINTENANCE BOND IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of , 20_ Principal. Surety. C XS I a tr ue rcu CA-MtAri CA-VA 11 �1 CJ 'lc ,A U-Y ice Fl,� By. ` By. l 1a-C 63 t r Title: Pre s%Je ' Title -K9 = R Address. Address 557,D lo horn `16U -Third ikueJ ` P z U- n1 n`'"lDCS1-1 '1 1J Mk lDO 11 Telephone. A%I 5 rig ' 6,6 a35 Telephone: JZ ` 62J-' 3 3 Fax. A 1231 '14( - t)b39 Fax. NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. END OF SECTION 07/2006 00612-2 of 2 CITY OF PEARLAND PAYMENT BOND Section 00611 PAYMENT BOND STATE OF TEXAS § COUNTY OF BRAZORIA § KNOW ALL MEN BY THESE PRESENTS That. .. of the City of , County of ._, and State of Texas, as: principal, and authorized.under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee (Owner),.:in the penal sum of$ .for the payment whereof, the said Principal and Surety bind themselves, arid their heirs, administrators, executors, successors, and assigns,jointly and severally, by these presents. WHEREAS; the Principal has entered into a certain written contract.with the Owner; effective as of the day.of , 20_, (the "Contract") to commence and complete the construction of certain improvements described as follows. Liberty and Suburban Garden Ground Storage Tank Rehabilitation City of Pearland,Texas COP PN: Liberty/Garden .BID NO 0216-23 which Contract, including the Contract Documents as defined therein, is hereby referred to and made a part hereof:asfully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATI.ON IS SUCH, that if the said Principal shall pay all claimants supplying labor or material to him or a subcontractor in the prosecution of the Work provided for in said Contract, then, this obligation shall be void, otherwise to remain in full force and effect; PROVIDED,.HOWEVER, that this bond is executed pursuant to the provisions of Chapter.225.3. of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Statute to.the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees.that no change, extension of time, alteration or addition to the terms of the. contract, or to -the Work performed thereunder;. or the plans, specifications, or drawings accompanying the same, shall in:any way affect its obligation on this bond, and it does hereby waive notice of any such change,-extension of time, alteration or addition to the terms of the Contract, or to the Work to:be.performed thereunder 07/2006 00611 - r of 2 CITY OF PEARLAND PAYMENT BOND IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of ,20 Principal. Surety By By. Title: Title. Address. Address. Telephone Telephone. Fax. Fax. NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE:OBTAINED FROM:THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. END OF SECTION 07/2006 00611 -2 of 2 F t s E 1 a i 1 ENDURANCE AMERICAN INSURANCE COMPANY LABOR AND MATERIAL PAYMENT BOND Bond No. EAIC961700003 (hereinafter the"Bond") i i KNOW ALL MEN BY THESE PRESENTS That we,the undersigned,PARADALIS Industrial Enterprises,Inc., as Principal,and Endurance American Insurance Company,with its home office at 750 Third Avenue,New York,New York 10017,a corporation organized and existing under and by virtue of the laws of the State of Delaware,and duly authorized to transact business g in the State of Texas,as Surety,are held and firmly bound,jointly and severally,with our heirs, w executors,administrators,successors and assigns unto City of Pearland,having an address of g 3519 Liberty Drive,Pearland,TX 77581 (hereinafter referred to as"Obligee") in the penal sum 1 of One Hundred Eighty Four Thousand One hundred twenty-five and 00/100$(184,125 00) dollars(hereinafter referred to as"Penal Sum"),for the payment of all Labor,materials and equipment furnished for use in the performance of the Contract,contingent upon all of the terms, , 1 conditions and limitations hereof. SIGNED and sealed this day of ,20 . THE CONDITION OF THE ABOVE OBLIGATION IS SUCH TIIAT,WHEREAS,the above named Principal did on the day of ,20_enter into a written contract with 4. the Obligee for Liberty and Suburban Garden Ground Storage Tanic Rehabilitation(hereinafter "the Contract"). ` t NOW,if the said Principal shall pay all valid and adequately documented claims asserted E 1 by Claimants as defined herein,we agreeing and assenting that this umdertaldng shall be for the benefit of such Claimants,then the Surety and Principal shall have no obligations under this 1 x Bond and this obligation shall be void,otherwise,the same shall remain in full force and effect, ; i it being expressly understood and agreed that the total liability of the Surety hereunder shall in 11 no event exceed the Penal Sum of this obligation as herein stated. The Obligee agrees that any ji and all payments issued by the Surety under this Bond are to be credited against the Penal Sum of the Bond. 1 The Surety shall have no obligation to Claimants under this Bond unless and until: a) Claimants who are employed by or have a direct contract with the 1 1 Principal shall have given written notice to Surety,the Principal 1 1 and the Obligee, above named,stating that a claim is being made under this Bond and stating with substantial accuracy the amount of'such claim. Such notice shall be served by mailing the same by registered or certified mail,postage prepaid,in an envelope 1 addressed to the Principal, Obligee or Surety,as the case may be, g. at the address stated for each herein;or ;s 1 Endurance American Insurance Company WS-1190712-0811 1 i i 4 1 b) Claimants,other than one having a direct contract with the Principal,shall have given written notice to the Principal,the Obligee, and the Surety above named, within ninety(90)days after such Claimant did or performed the work or Labor, and/or furnished the materials and/or equipment for which said claim is made, stating with substantial accuracy the amount claimed and the name of the party to • whom the materials and/or equipment were furnished,and/or for whom the work • or Labor was done or performed. Such notice shall be served by mailing the same • i by registered or certified mail,postage prepaid,in an envelope addressed to the ;l Principal, Obligee or Surety, as the case may be, at the address stated for each herein. g r a 2. No suit or action shall be commenced hereunder by any Claimant: I a) Unless,and until,no sooner than forty-five(45) days after, Claimant has served notice to Surety,Principal and Obligee as 1 required in the preceding paragraph; 0 b) Until after the expiration of one(1)year following the date upon which the Claimant last performed work or furnished materials t under said contract,it being understood,however,that if any limitation embodied in this Bond is prohibited by any law 'g: controlling the construction hereof such limitation shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law;and c) Other than in a state court of competent jurisdiction in and for the g- county or other political subdivision of the state in which the project,or any part thereof,is situated,or in the United States District Court for the District in which the project,or any part thereof, is situated,and not elsewhere. • g 1 3 Obligee agrees that amounts owed by Obligee to the Principal under the Contract shall be used for the performance of the Contract and to pay valid claims by subcontractors, * . suppliers and/or others providing Labor,materials and/or equipment to or on behalf of the 3 Principal in the performance of the Contract. By the Principal furnishing and the Obligee accepting this Bond,they each agree that all funds earned by the Principal in the performance of the Contract are dedicated to satisfy the obligations of the Principal and Surety under this Bond. li 4 The Obligee agrees that Surety shall not be liable to Obligee or others for obligations of the Principal that are unrelated to the Contract,and that the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations or by any other claims of Obligee or others. 5 The Obligee shall not be liable for payment of any costs or expenses of any Claimant under this Bond and Obligee shall have no obligation to make payments to,give notices on behalf of,or otherwise have any obligations to Claimants under this Bond. il 2 Endurance American Insurance Company WS-1190712-0811 1 i 1 t I 6. Upon request by any person or entity appearing to be a potential Claimant under this Bond,the Obligee shall promptly furnish a copy of this Bond or permit a copy to be made by the potential Claimant. 7 Definitions: f a) Balance of the Contract Price; The total amount payable by the Obligee to I Principal under the Contract after all proper adjustments have been made, including allowance to Principal of any amounts received by the Obligee in settlement of insurance or other claims for damages to which the Principal is ; I entitled,reduced by all valid and proper payments made to or on behalf of the 1 Principal under the Contract. b) Contract: The agreement between the Obligee and the Contractor identified herein,including all Contract Documents and changes reasonably foreseeable thereto. c) Contract Documents: All the documents that comprise the agreement between.the Obligee and the Contractor . 1 : d) Claimant: An individual or entity having a direct contract with the Principal or P with a subcontractor of the Principal to furnish Labor,materials and/or equipment i for use directly in the performance of the Contract. The term"Claimant"also 5. includes any individual or entity that has rightfully asserted a claim under an • applicable mechanic's lien or similar statute against the real property upon which • i the Project is located. The intent of this Bond shall be to include without 5.1 limitation in.the terms Labor,materials and/or equipment that part of water,gas, power,light,heat,oil,gasoline,telephone service or rental equipment used in the I Contract, architectural and engineering services required for performance of the I work of the Principal and the Principal's subcontractors,and all other items for i which a mechanic's lien may be asserted in the jurisdiction where the Labor, I materials or equipment were furnished. e) Labor Net wages only due and owing for work directly required in the performance of the Contract,and shall not be deemed to include union dues, fringe benefit or similar contributions,employee withholding taxes (or any other taxes),bonuses,or any other form of compensation or remuneration whatsoever i i 1 1 I 1 Endurance American Insurance Company 3 WS-1190712-0811 B 1 Company:PARADALIS Industrial Enterprises,.Ino, Address 3320 Longhorn, Houston,TX • Attests Signature: Surety:Endurance Arnerloan ins CC Co. Address:750 Third Ave,2°`► caor New.York,New York i0017 Attest: � 1�—�' Signature: • rY Attorney-In-Pact 4 fi �ff is fi Endurance Amor►can Insurance Company Ws-11'oo7i2-oa fi ENDURANCE AMERICAN INSURANCE COMPANY 1 EAIC961700005 Seal Number.98 POWER OF ATTORNEY 2(ltow an"Wen 6y t(fen SPirssnts,that ENDURANCE AMERICAN INSURANCE COMPANY,a Delaware corporation(the'Corporation'),with offices at 7E0 ThirdAvenue,New York,New York 10017,hes made,constituted end appointedand by these presents,does make,constitute and appoint MICHAEL T.SIEGELER,TERESA S.MUNIZ,KRISTINA M.MATTHIJETZ 1 1 Its Irue and lawful Altorney(s)4n-in at GIDDINGS in the Slate of TX and each of thorn to have 1 i paver to act without the other or others,to make,execute,seat and deliver for and an its behalf • I. bonds,undertakings orobtigalions in surely orco-surolywith others,also to execute and deliveron its behalf renewals,extensions,agreements,waivers consents or stipulations relating to such 1 1 aforesaid bonds,undertakings or ohllgallans provided,however,that no single bond or undertaking so made,executed and delivered shall obligate the Corporation far any portion of the penal sum 9 1 thereof In excess of the sum el TEN MILLION Dollars($10,000,000.00). i t Such bonds and undertakings for said purposes,when duly executed by said attorneys)-in•fact,shall be binding upon the Corporation as fully and to the same extent as if signed by the President of i F. the Corporation under its corporate seal attested by its Corporate Secretary.5 This appointment is made under and by authority of certain resolutions adopted by the Board of Directors of tine Corporation by unanimous written consent on the 2111 day of July,2011,a copy of 0 which appears below under the heading entitled'Certificate' 5 This Power of Attomoy is signed and sealed by facsimile under and by authority of the following resolution adopted by the Board of Directors of the Carporatlon by unanimous written consent on the 21"day of July,2011 end said resolution has not since been revoked,amended or repealed: RESOLV totfaelj()grantingpowersofattorneypursuanttocertainresolutionsadoptedbytheBoardofDirectorsoftheCorporationbyunanimouswrittenconsenton ' Ih4 1arl:dillejy401,1 the signature of such directors and officers and the seal of the Corporation may be affixed to any such power of attorney ,gt'o oe�i$f, vola6ib;�11wolo by While),and any such polder of eed:ley of Cert�cato bearing such fatsirnile signature or seat shall be valid and binding jdg�� V•olr ttbp 11 F( fyluro with rasped to any bond or undertaking to which it is anached, Y� t viA ale This PoWW NAttomny�eltaiiJxpirearidel(uthorityhereundershallterminatewithoutnoticeat12:01a.m.(StandardTimerwheresaidallorney(s)1n•factisauthorizedtoact.) JANUARrT1 201719% t5 IN WITNE,:pit OF,,t11 Oct* 6 has caused lhe.sepresents to be duly signedand its corporate seat to be hereunto affixed and attested this 1ST day of FEBRUARY,2016 al New York, New York',,f7 .''7\l'''. •s; (CarporaleSeal);R" �. );:.�`'� ENDURANCE AMERICAN INSURANCE COMPANY >''''Ulern,,'"" -74,.<.L nr' 1))1 e 2,„,.0 ATTEST _. ....... By _._. .,,. Richard M.Appel,Senior Vice President Brian Beggs,Executive Vice President STATE OF NEW YORK es:MANHA7TAN COUNTY OF NEW YORK On the 1ST day of FEBRUARY,2016 before me personally came LYNNE MOYER to me known,who being by me duly sworn,old depose and say that(s)he resides in NEW YORK,NEW YORK that (s)he Is a SENIOR 1006 PRF,SIDENT of ENDURANCE AMERICAN INSURANCE COMPANY the corporation described in and which executed the above instrument;that(s)he knows the seal of eafd corpoie1art``firth a kob to said in Simard is such corporate seal;that It was to affixed by order of the Board of Direetots of said corporation,and that(s)he signed his(het)name thereto li bylikeorr r. O (NolarialSe�ls' qcy Ry C'' -. 01M fit e13/1 _ .„„„• ....... QUALIFIED IiI - Maria Linares(Arroyo),Notary Pubic-My Commission Expires:February23,2017 'IAF.STt atAcY f "„, 0212311es,?' ..4 CERTIFICATE STATE OF,NII1Yci K8LI c Spa;MANHATTAM R COUNTY OF3N.e1 9pEAT€iZt `. I,Doug Womran,the li CI{iel'Executive Officerof ENDURANCE AMERICAN INSURANCE COMPANY,a Delaware Corporation(the'Corporation'),hereby certify: 1, h I� 1.That the original paver of attorney of which the foregoing Is a copy was duly executed an behalf of the Corporation and has not since been revoked,amended or modified;that the undersigned has compared the foregoing copy tiered with the original power of attorney,and that the same Is a true and correct copy of the original power of attorney and of the whole thereof; �. 1, 2, Tho following are resolutions which were adopted by the Board of Directors of the Corporation by unanimous written consent on the 21st day of July,2011 and said resolutions have not since been revoked,amended or modified: ( 'RESOLVED,that each of the Indvlcltais named below Is awhorl2ed to make,execute,seal and deliver for and on behalf of the corporation any and all bonds,underaiings of obligations In surety or co-surety with others and to execute and deliver for and on behalf of the Corporation renewals,extensions,agreements,waivers,consents or stipulations relating to such aforesaid bonds, undertakings or obligations: RICHARD M.APPEL,LYNNE MOYER And RESOLVED �,�atlrl3Y��� � ���F of the individuals named above is authorized to appoint attomeys•in•faci far the purpose of making,execuligg,sealing and delivering bonds,undertakings or obligations Try !tot-Worm o-J"_raty 1W14en behalf of the Corporation. v 'c' ''link l 3. The u 'la,' eh further certi�te1 ih ttjfIe above resolutions are true and correct copies of the resolutions as so recorded and of the whole thereof. aP , r'I%% IN WITNESS yviiE E06,phave here rdto set my hand and affixed the corporate seal this day of ,20 e A' r Ik(Corporrat 'cl. --�--� -.''`"`�%._. `'%1; x 1. "' Doug Worm an,Chief Executive OfficerofU.S.Insurance Any reproductions are void. , , 4r; ii CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Section 00700 GENERAL CONDITIONS OF AGREEMENT TABLE OF CONTENTS Page No. 1.0 DEFINITIONS AND INTERPRETATIONS 1 1 01 Owner, Contractor and Engineer 1 02 Contract Documents 103 Subcontractor 1 04 Written Notice 105 Work 1 06 Extra Work 1 07 Work Day 1 07-1 Rain Day 1 07-2 Impact Day 1 08 Calendar Day 1 09 Substantially Completed 1 10 Interpretation of Words and Phrases 1 11 Referenced Standards 1 12 Contract Time 1 13 Construction Inspector 1 14 Balancing Change Order 2.0 RIGHTS AND RESPONSIBILITIES OF THE OWNER' 4 2.01 No Warranty of Design 2.02 Right of Entry 2.03 Ownership of Plans 10-2012 00700-i CITY OF PEARLAND I GENERAL CONDITIONS OF AGREEMENT 2.04 Changes and Alterations 2 05 Damages 3.0 RIGHTS AND RESPONSIBILITIES OF THE ENGINEER 6 3 01 Owner-Engineer Relationship 3 02 Keeping of Plans and Specifications Accessible 3 03 Preliminary Approval 1 3.04 Inspection by Engineer 3 05 Determination of Questions and Disputes 3 06 Recommendation of Payment 4.0 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR 8 4 01 Independent Contractor 4 02 Contractor's Unde I standing 4 03 Laws and Ordinances F 4 04 Assignment arid Subletting 4 05 Performance and Payment Bonds [and Maintenance Bond] 1 4 06 Insurance 4 07 Permits and Fees 4 08 Texas State Sales Tax 4 09 Contractor's Duty and Superintendence 4 10 Character of Workers 4 11 Labor, Equipment,;Materials, Construction Plant and Buildings 4 12 Sanitation 4 13 Cleaning and Maintenance 4 14 Performance of Work 4 15 Right of Owner to Accelerate the Work 10-2012 00700- CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4 16 Layout,of Work 4 17 Shop Drawings 4 18 Engineer-Contractor Relationship, Observations 4 19 Observation and Testing 4.20 Defects and Their Remedies 4.21 Liability for Proper Performance 4.22 Protection Against Accident To.Employees and the Public 4.23 Protection of Adjoining.Property 4.24 Protection against Claims of Subcontractors,Laborers,Materialmen,. and Furnishers of Equipment, Machinery and Supplies 4.25 Protection Against Royalties orPatented Invention 4.26 Indemnification 4.27 Losses From Natural Causes 4.28 Guarantee 5.0 PROSECUTION AND PROGRESS 18 5 01 Time and Order of Completion 5 02 Extension of Time 5 03 Hindrances and Delays 5 04 Suspension of Work 5 05 Liquidated Damages for Delay 5 06 Change of Contract Time 5 07 Delay Beyond Owner's and Contractor's Control 6.0 MEASUREMENT AND PAYMENT 21 6 01 Discrepancies and Omissions 6 02 Quantities and Measurements 10-2012 00700-iii CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 6 03 Estimated Quantities 6 04 Pnce of Work 6 05 Payments 6.06 Partial Payments 6 07 Use of Completed Portions &Punchlist 6 08 Substantial Compl tion 6 08-11 6 09 Final.Payment 6 10 Correction of Work Before Final Payment 6 11 Correction of Work After Final Payment 6 12 Payments Withheld 6 1:3 Delayed Payments 7.0 EXTRA WORK AND CLAIMS. 27 7 01: Differing Site Conditions 7 02 Change Orders 7 03 Change.Orders 7 04 Request for Work Approval for Work on Non-Work Days 7 05 Minor Changes 7 06 Extra Work 7 07 Time of Filing Claims 8.0 DEFAULT 30 8 01 Default by Contractor 8 02 Supplementation of Contractor Forces 8 03 Cumulative Remedies & Specific Performance 8 04 Cross-Default 10-2012 00700-iv CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 8 05 Insolvency 8 06 Contingent Assignment 8.07 Waiver of Consequential Damages 8 08 Termination for Convenience 8 09 Default by Owner 9.0 DISPUTE RESOLUTION 35 ATTACHMENT NO 1 WORKERS' COMPENSATION INSURANCE COVERAGE Al: ATTACHMENT NO :2 AGREEMENT FOR FINAL PAYMENT AND CONTRACTOR'S SWORN RELEASE B1 ATTACHMENT NO 3 OWNER'S INSURANCE REQUIREMENTS OF CONTRACTOR Cl 10-2012 00700-v CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Section 00700 GENERAL CONDITIONS OF AGREEMENT 1.0 DEFINITIONS AND INTERPRETATIONS 101 OWNER, CONTRACTOR AND ENGINEER. The OWNER, the CONTRACTOR and the ENGINEER are those persons or organizations identified as such in the Agreement. The term ENGINEER as used in these General Conditions shall refer to the Engineer or Architect identified in the Agreement, as applicable, and means a person authorized to act as a representative of the entity designated by the OWNER to provide professional services required in connection with the preparation of plans and specifications of this Contract. The term CONSTRUCTION MANAGER as used in these General Conditions shall refer to the Construction Manager identified in the Agreement, as applicable, and means a person authorized to act as representative of the entity designated by the OWNER to provide professional services required in connection with the performance of the work of this Contract. The Owner's representative on the project site shall be the CONSTRUCTION MANAGER or ENGINEER as designated. 1 02 CONTRACT DOCUMENTS. The Contract Documents shall consist of all of the documents identified in Article 8 of the Standard Form of Agreement, which documents, excluding such documents as may be delivered or issued after the Effective Date of the Agreement, as referenced in Article 8, shall be bound together in a Project Manual for the Work. All references to the "Contract" or the "Agreement" in these General Conditions of Agreement shall include the Contract Documents. The Contract Documents are complementary, and what is required by one shall be binding as if required by all. In the event of any conflict among the Contract Documents, the Contract Documents shall govern in the following order (1) Modifications in writing and signed by both parties, including any Change Orders, (2) Standard Form of Agreement; (3) Special Conditions of Agreement; (4) General Conditions of Agreement, including Attachment No 1 — Workers' Compensation Insurance Coverage, Attachment No 2 — Agreement for Final Payment and CONTRACTOR'S Sworn Release, and Attachment No 3 — Owner's Insurance Requirements of Contractor; (5) Addenda, if any; (6) Plans and Specifications referenced or included in the Project Manual, (7) Instructions to Bidders, (8) Bid Proposal, and 10-1012 00700- 1 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (9) Exhibits. The following Exhibits, if any, attached hereto, are incorporated herein, and are a part of this Contract: In the event a conflict or inconsistency remains between or within the Contract Documents, or the Contract Documents and applicable standards, codes and ordinances, CONTRACTOR shall provide the greater quantity or better quality, or CONTRACTOR shall comply with the more stringent requirements, as determined by ENGINEER. Terms or phrases used in the Contract Documents with a well-known technical or construction industry meaning shall have such recognized meanings. References to standards, specifications, manuals or codes of any technical society, organization or association, or to the laws or regulations of any governmental authority, shall mean the latest in effect on the effective date of the Contract, unless otherwise stated in the Contract Documents. 1 03 SUBCONTRACTOR. The term "subcontractor", as employed herein, includes those entities having a contract with the CONTRACTOR or a subcontractor for performance of work on the Project. OWNER shall have no responsibility to any subcontractor for performance of work on the Project contemplated by these Contract Documents, and any such subcontractor shall look exclusively to CONTRACTOR for any payments due subcontractor 1 04 WRITTEN NOTICE. Written Notice shall be deemed to have been duly served if delivered in person or by electronic means through the Pro-Trak to the individual or to a partner of the partnership or joint venture, or to an officer of the corporation or company for whom it is intended, or if delivered at or sent by Certified Mail, Return Receipt Requested, to the last known business address or registered office of such individual,partnership,joint venture or corporation or _ company, or to the address for giving notices listed in the Standard Form of Agreement. 1 05 WORK. Unless otherwise stipulated, the CONTRACTOR shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, services, insurance, and all water, light, power, fuel, transportation and all other facilities or services of any nature whatsoever necessary for the execution and completion of the Work described in the Standard Form of Agreement. Unless otherwise specified, all materials shall be new, and both workmanship and materials shall be of good quality The CONTRACTOR shall, if required by the ENGINEER as representative of'the OWNER, furnish satisfactory evidence as to the kind and quality of materials. Materials orgy work described in words which so applied have well-known, technical or trade meaning shall be held to refer to such recognized standards. All work shall be done and all materials shall be furnished in strict conformity with the Contract Documents. 1 06 EXTRA WORK. The term "Extra Work", as used in this Contract, shall be understood to mean and include all work that may be required by the ENGINEER as representative of the OWNER, to be performed by the CONTRACTOR to accomplish any change, alteration or addition to the work shown in the plans. Extra work shall be authorized in writing by the ENGINEER prior to commencement. Extra Work items are paid for on an as needed, as authorized basis only 1 07 WORK DAY A4 used herein, a "Work Day" is defined as any Monday through Friday, not a legal holiday, and any Saturday or Sunday specifically approved by the OWNER, in which the CONTRACTOR can perform six or more hours of work per the current construction schedule. CONTRACTOR agrees to request specific approval from the Construction Manager or 10-1012 00700-2 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Owner, in advance, to perform work on Saturdays or Sundays and in so doing agrees to pay all charges and costs for Inspection and or Construction Management services required during the performance of any such approved work. Refer to paragraph 7 05 for procedure to determine cost for Construction Management and Inspection Services for work on non-work days. 1 07-1 RAIN DAY As used herein, is defined as any WORK DAY during which weather related conditions prevent the CONTRACTOR from performing four (4) or more consecutive hours of work on critical path items as identified in the current construction schedule. CONTRACTOR shall record Rain Days on the Pay Application each month for the review and possible approval by the OWNER. The approved Rain Day is then added to the Contract Time. (See 1 12 Contract Time below) 1 07-2 IMPACT DAY As used herein, is a day that is added to the CONTRACT TIME by the OWNER by Change Order to extend the Contract Time by one full Work Day (See 1 12 Contract Time below) Impact Days, once approved by the OWNER, shall extend the Contract Time on a one-to-one basis to replace a Work Day lost to conditions that prevented the CONTRACTOR from performing four (4) or more consecutive hours of work on critical path items. Impact Days are added to the Contract Time by Change Order only at the end of the work and then only if, in the opinion of the OWNER, a time extension is warranted due to delays beyond the control of the Contractor and required to complete the work within the Contract Time. 1 08 CALENDAR DAY A "calendar day" is any day of the week, month or year no days being excepted. Unless otherwise expressly provided, all references to "day(s)" shall mean calendar day(s). 1 09 SUBSTANTIALLY COMPLETED. The terms "Substantially Completed", or "Substantially Complete" or"Substantial Completion" as used in this Contract, shall mean that all major process components of the facility or work have been made suitable for use or occupancy, including appropriate documentation from the equipment suppliers that all of the individual components have been installed in accordance with the specifications and manufacturer's recommendations, the installations have been approved by the ENGINEER and the items have met the start-up and testing requirements of the contract documents or is deemed to be in a condition to serve its intended purpose or requires only minor miscellaneous work and adjustment to achieve Final Completion and Acceptance as determined by the ENGINEER. Upon compliance with the above referenced critena, ENGINEER shall issue a Certificate of Substantial Completion. PARTIAL SUBSTANTIAL COMPLETION designation will be given on components of the Work that must be placed mto service prior to the completion of the entire Work. The contractor's One Year Warranty period for these items shall begin on the date of Partial Substantial Completion as designated by the ENGINEER. The ENGINEER shall determine and make all such designations. 110 INTERPRETATION OF WORDS AND PHRASES. Whenever the words "directed", "permitted", "designated", "required", "ordered", "considered necessary", "prescribed" or words of like import are used, it shall be understood that the direction,requirement,permission, order, opinion designation or prescription of the ENGINEER as the OWNER's representative is intended. Similarly, the words "approved", "acceptable", "satisfactory" or words of like import shall mean that no exception is taken by ENGINEER, but does not relieve CONTRACTOR of responsibility for compliance with the Contract Documents. 10-1012 00700-3 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Whenever in the Specifications or Plans of the Contract Documents, the terms of description of various qualities relative to finish, workmanship or other qualities of similar kind which cannot, from their nature, be specifically and clearly described and specified, but are necessarily described in general terms, the fulfillment of which must depend on individual judgment, then, in all such cases, any question of the fulfillment of said Specifications shall be decided by the ENGINEER as the OWNER's representative, and said work shall be done in accordance with his interpretations of the meaning of the words, terms or clauses defining the character of the work. 111 REFERENCED STANDARDS. No provision of any referenced standard specification, or manual shall be effective to change the duties and responsibilities of the Owner, Engineer, Contractor, or their consultants, employees, or representatives from those set forth in the Contract Documents, nor shall it be effective to assign to the Engineer or its consultants, employees, or representatives arty duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undertake responsibilities contrary to provisions of the Contract Documents. 1 12 CONTRACT TIME The term Contract Time as used herein, refers to the number of Calendar days provided to complete the work or the date, stated in the Agreement: (i)to achieve Substantial Completion, and (ii) to complete the Work so that it is ready for final payment as evidenced by ENGINEER's written recommendation of final payment in accordance with Paragraph 6 09 and as modified asl a result of any authorized Extensions. The established Contract Time includes 40 Rain Days per year, based on the average - number of rain days per year for;the period of June 1898 to December 1996 as recorded by the _ Alvin Weather Center Record. The Contract Time shall only be extended by (a) the addition of Rain Days equal to the number of actual Rain Days in excess of 40 days per year and (b) the number of Impact Days granted for delays, in the opinion of the Owner, beyond the control of the Contractor The extension of the Contract Time shall be the CONTRACTOR's sole and exclusive remedy for delays. 1 13 CONSTRUCTION INSPECTOR The term "Construction Inspector" here in includes those professionals engaged by the OWNER to ensure CONTRACT work's compliance with the specifications and any applicable statutory requirements. 1 14 BALANCING CHANGE ORDER is a change order executed during the close-out process that may add/remove pay, items, or adjust quantities of existing items or remove unused pay items or quantities Balancmgi Change Orders are used to reconcile the unit cost of the work performed or installed by the Contractor 2.0 RIGHTS AND RESPONSIBILITIES OF THE OWNER 2.01 NO WARRANTY OF DESIGN It is understood that the OWNER MAKES NO WARRANTY OF THE ADEQUACY, ACCURACY OR SUFFICIENCY OF THE PLANS AND SPECIFICATIONS OR ANY OTHER DESIGN DOCUMENTS, AND OWNER HEREBY EXPRESSLY DISCLAIMS ANY SUCH WARRANTY, EXPRESSED OR IMPLIED Prior to commencing each portion of the ;Work, CONTRACTOR shall carefully study and compare the relevant Contract Documents, shall observe conditions at the site affecting the Work, and shall take field measurements of existing conditions related to the Work. Any errors, omissions or 10-1012 00700-4 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT inconsistencies in the Contract Documents noted by the CONTRACTOR, and/or any variance between the Contract Documents and applicable codes, standards or ordinances, shall be promptly reported by CONTRACTOR to ENGINEER in writing as a Request for Information. Work performed pnor to a Request for Information shall be at the Contractor's risk. If CONTRACTOR fails to perform its obligations under this paragraph, CONTRACTOR shall pay such costs and damages to OWNER as would have been avoided if CONTRACTOR had reported any errors, omissions, inconsistencies or variances in the Contract Documents noted by CONTRACTOR or which should have been noted by a careful study of the Contract Documents. CONTRACTOR shall comply with the Contract Documents, all approved modifications thereof and additions and alterations thereto approved in writing by the OWNER. The burden of proof of such compliance shall be upon the CONTRACTOR to show that he has complied with the requirements of the Contract Documents and approved modifications thereof and all approved additions and alterations, thereto, as the same shall have been interpreted by the ENGINEER. 2.02 RIGHT OF ENTRY The OWNER reserves the right to enter the property or location on which the work herein contracted for is to be performed, constructed or installed, for itself or such agent or agents as it may select, for the purpose of inspecting the work, or for the purpose of performing, constructing or installing such collateral work as the OWNER may desire. The OWNER shall have the right to make inspections at all reasonable times, and the CONTRACTOR hereby waives any claims for extension of time and/or compensation for any loss or damage if his work shall be delayed by reason of such inspection, performance, construction or installation of collateral work. 2.03 OWNERSHIP OF PLANS All plans, specifications and copies thereof furmshed by the OWNER shall not be reused on other work and, with the exception of the sets forming the part of the signed Contract Documents, are to be returned to the OWNER on request at the completion of the Work. All plans and models are the property of the OWNER. 2.04 CHANGES AND ALTERATIONS The CONTRACTOR further agrees that the Owner may make such changes and alterations, additions and deletions as the OWNER may see fit, in the Work, including but not limited to changes in line, grade, form, dimensions, plans or specifications for the Work herein contemplated, or any part thereof, either before or after the beginning of construction, without affecting the validity of this Contract and the corresponding Performance and Payment Bonds. If such changes or alterations or deletions diminish the quantity or the value of the Work to be done,they shall not constitute the basis for a claim for compensation or damages, including lost or anticipated profits on the Work that may be affected. If the amount of Work is increased and the work can fairly be classified under the specifications, such increase shall be paid for according to the quantity actually done and at the unit pnce, if any, established for such work under this Contract, otherwise, such additional work shall be paid for as provided under Article 7 hereof for Extra Work. In case the OWNER 'shall make such changes or alterations as shall make useless any Work already done or material already furnished or used in said Work,then the OWNER shall compensate the CONTRACTOR for any matenal or labor so used and for any actual loss occasioned by such change due to actual expenses incurred in preparation for the Work as originally planned. 2.05 DAMAGES In the event the OWNER is damaged in the course of the work by the act, negligence, omission, mistake or default of the CONTRACTOR, or should the 10-1012 00700-5 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT CONTRACTOR unreasonably delay the progress of the work being done by others on the job so as to cause loss for which the OWNER becomes liable, then the CONTRACTOR shall reimburse the OWNER for such loss. 3.0 RIGHTS AND RESPONSIBILITIES OF THE ENGINEER 3 01 OWNER-ENGINEER RELATIONSHIP The ENGINEER shall serve as the OWNER'S representative during construction. The duties, responsibilities and limitations on the authority of the ENGINEER as the OWNER's representative during construction are set forth in the Contract Documents, and the ENGINEER shall not have authority to extend the OWNER's liability or to bind the OWNER for any additional liability of any nature whatsoever without the written consent of the OWNER. Any communications by the OWNER to the CONTRACTOR regarding the Work shall be issued through the ENGINEER. It is the intent of this Agreement that there shall be no delay in the execution of the Work; therefore, written decisions or directions rendered by the ENGINEER as the OWNER's representative shall be promptly carried out, and any claim arising therefrom shall be resolved as provided in Article 7 Unless othelrwise specified, it is mutually agreed between the parties to this Agreement that the OWNER'S representative shall have the authority to issue written stop work orders whenever such stoppage may be necessary to insure the performance of the Work in accordance with the Contract Documents. 3 02 KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE. The ENGINEER shall furnish the CONTRACTOR with four (4) copies of all Plans and Specifications without expense to the CONTRACTOR, and the CONTRACTOR shall keep one full size copy of the same constantly accessible on the job site, with the latest revisions noted thereon. The CONTRACTOR shall be responsible for preserving the Plans and Specifications, timely and accurately updated, for reference and review by the OWNER or the ENGINEER and submittal of redlines during closeout. 3 03 PRELIMINARY APPROVAL. The ENGINEER shall not have the power to waive the obligations imposed under this Contract for the furnishing by the CONTRACTOR of new material of good quality, and for good and workmanlike performance of the Work as herein described, and in full accordance with the Contract Documents, without alteration, deletion or change. No failure or omission oflthe OWNER'S representative to discover, object to or condemn any non-conforming or defective work or material, or to stop work, shall release the CONTRACTOR from the obligation to fully and properly perform the Contract, including without limitation, the obligation to at once remove and properly replace any defective work or material at any time prior to final acceptance, upon discovery of such non-conforming or defective work or material. Any questioned Work may be ordered taken up or removed for inspection by the ENGINEER prior to final acceptance, and if found not to be in accordance with the Contract Documents, all expense of removing, inspection and repair or replacement shall be borne by the CONTRACTOR, otherwise the expense thus incurred shall be allowed as Extra Work and shall be paid for by the OWNER,provided that where inspection or approval is specifically required by the Specifications prior to performance of certain work, should the CONTRACTOR proceed with such work without requesting prior inspection or approval, he shall bear all expense of taking up, removing and replacing this work if so directed by the ENGINEER. 10-1012 00700-6 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 3 04 INSPECTION BY ENGINEER. The ENGINEER will make periodic visits to the site to observe the progress and quality of the executed Work and to determine if such Work generally meets the essential performance and design features and the technical, functional /or engineering requirements of the Contract Documents, and is in all other respects being performed in compliance with the Contract Documents. However, the ENGINEER shall not be responsible for making any detailed, exhaustive, comprehensive or continuous on-site inspections to check the quality and/or quantity of the work, nor shall the ENGINEER be in any way responsible, directly or indirectly, for the construction means, methods, techniques, sequences, quality, procedures, programs, safety precautions or lack of same incident to the Work being performed or any part thereof. The ENGINEER shall use reasonable care to prevent deviation from the intent and substance of the Contract Documents by the CONTRACTOR in the performance of the Work and any part thereof and, on the basis of such on-site observations, will keep the OWNER informed of the progress of the work and will endeavor to guard the OWNER against defects and deficiencies in the Work of the CONTRACTOR. Notwithstanding any other provision of this Agreement or any other Contract Document, the ENGINEER shall not be in any way responsible or liable for any acts, errors, omissions or negligence of the CONTRACTOR, any subcontractors, agents, servants or employees or any other person, firm or corporation performing or attempting to perform any of the Work. 3 05 DETERMINATION OF QUESTIONS AND DISPUTES In order to prevent delays and disputes and to discourage litigation, it is agreed that the ENGINEER shall, in all cases, determine the quantities and qualities of the several kinds of Work, which are to be paid for under this Contract. The ENGINEER shall address all questions in relation to said Work and the construction thereof, as well as all claims, disputes and other matters in question between the CONTRACTOR and the OWNER relating to the execution or progress of the Work or the interpretation of the Contract Documents. In the event the ENGINEER shall become aware of or shall receive information that there is a dispute or a possible dispute as to the reasonable interpretation of the terms and conditions of the Contract Documents, or any other dispute or question, the ENGINEER shall, within a reasonable time, provide a wntten interpretation of the Contract Documents or a written decision on all questions arising relative to the execution of the Work, copies of which shall be delivered to all parties to the Contract. If the CONTRACTOR or OWNER desires to take exception to any directions, order, interpretation or instructions of the ENGINEER, CONTRACTOR or OWNER shall present any such claim to the ENGINEER in accordance with the provisions of Section 7 04 3 06 RECOMMENDATION OF PAYMENT The ENGINEER shall review the CONTRACTOR's application for payment and supporting documents, shall determine the amount owed to the CONTRACTOR and shall provide written recommendation to the OWNER for payment to the CONTRACTOR in such amount. Such recommendation of payment to CONTRACTOR shall constitute a representation to the OWNER of the ENGINEER'S judgment that the work has progressed to the point indicated, to the best of his knowledge, information and belief; however, such recommendation of an application for payment to CONTRACTOR shall not be deemed an acceptance of any defective or non-conforming Work. Any recommendation of payment by the ENGINEER shall be subject to OWNER's rights to withhold payment under Section 6 11 and as otherwise provided in the Contract. 10-1012 00700-7 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.0 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR 4 01 INDEPENDENT CONTRACTOR. CONTRACTOR is, and shall remain, an independent contractor, solely responsible for the manner and method of completing the Work under this Contract, with full and exclusive power and authority to direct, supervise and control his own employees and to determine the means, method and manner of performing such Work, so long as such methods comply Ny ith the requirements of the Contract Documents, and do not adversely affect the completed improvements or any other property abutting or adjoining the Work area, the OWNER and ENGINEER being interested only in the result obtained and conformity of such completed improvements to the Plans, Specifications and Contract Documents. The fact that the OWNER or ENGINEER as the Owner's representative shall have the right to observe CONTRACTOR's work during his performance and to carry out the other prerogatives which are expressly reserved to and vested in the OWNER and the ENGINEER hereunder, is not intended to and shall not at any time change or affect the status of the CONTRACTOR as an independent contractor with respect to either the OWNER or the ENGINEER as the OWNER's representative or to the CONTRACTOR's own employees or to any other person, firm or corporation. 4 02 CONTRACTOR'S UNDERSTANDING It is understood and agreed that the CONTRACTOR has, by careful examination, satisfied himself as to the nature and location of the Work, the conformation of the ground, the character, quality and quantity of the materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the Work, the general and local conditions, including but not limited to weather, access, lay down and storage area , and all other matters which in any way affect the Work under this Contract. It is further understood that the CONTRACTOR has satisfied himself as to the terms, meaning, intent and requirements of all of the Contract Documents, and applicable laws, codes, regulations and ordinances. CONTRACTOR hereby warrants and represents that it has taken into consideration all of the foregoing factors, and CONTRACTOR shall perform the Work for the Contract Price and within,the Contract Time. No verbal agreement or conversation with any officer, agent or employee of the OWNER or the ENGINEER, either before or after the execution of this Contract, shall affect or modify any of the terms or obligations herein contained. 4 03 LAWS AND ORDINANCES The CONTRACTOR shall at all times observe and comply with all federal, state or local laws, codes, ordinances, permits and regulations, regardless of whether the same are adopted• before or after the execution of this Contract, which in any manner affect the Contract or the work, and shall indemnify, save and hold harmless the OWNER and the ENGINEER against any claim ansmg out of the violation of any such laws, ordinances and regulations, whether by the I CONTRACTOR or his agents, employees, subcontractors or vendors. If the CONTRACTOR observes that the Plans and Specifications are at variance with federal or state laws or codes or the ordinances or regulations of the City, he shall promptly notify the ENGINEER in wnting, and any necessary changes shall be made as provided in the Contract for changes in the work. If the CONTRACTOR performs any work knowing it to be contrary to such laws, codes, ordinances, rules or regulations, or if CONTRACTOR reasonably should have known of any such violation, and without such notice to the ENGINEER, CONTRACTOR shall bear all costs arising therefrom. The OWNER is a Political Subdivision of the State of Texas, and the law from which it denves its powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions under which the OWNER may enter into contracts, shall be controlling and shall be considered as part of this Contract to the same effect as though embodied herein. Neither the act 10-1012 00700-8of36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT of OWNER entering into this Contract, nor OWNER's performance hereunder, shall constitute a waiver of any immumty from suit enjoyed by OWNER under applicable law, all such rights and defenses being hereby expressly reserved, notwithstanding any term or provision herein to the contrary The Code of Ordinances and other applicable regulations of the OWNER shall be deemed to be embodied in this Contract. The prevailing wage rates applicable to this Project shall be either Document 00811 —Wage Scale for Engineering Construction, or Document 00813 —Wage Scale for Building Construction, or both, as set out in the Project Manual. 4 04 ASSIGNMENT AND SUBLETTING The CONTRACTOR further agrees that he will retain personal control and will give his personal attention to the fulfillment of this Contract and that he will not assign, by power of attorney or otherwise, or sublet said Contract, or any rights, duties or obligations arising thereunder, in whole or in part, without the prior written consent of the OWNER, and that no part or feature of the Work will be sublet to anyone objectionable to the ENGINEER or the OWNER. In addition, the OWNER reserves the right to disapprove the subletting of this Contract or any portion hereof on any basis whatsoever The CONTRACTOR further agrees that the subletting of any portion or feature of the Work or materials required in the performance of this Contract shall not relieve the CONTRACTOR from his obligations to the OWNER, as provided for by this Agreement. 4 05 PERFORMANCE, PAYMENT AND MAINTENANCE BONDS In the event the Contract Price shall be in excess of $25,000 00, the CONTRACTOR shall execute separate Performance, Payment and Maintenance Bonds, each in the sum of one hundred percent(100%) of the Contract Price, and each in accordance with the provisions of Chapter 2253 of the Texas Government Code. If the Contract Price does not exceed $25,000 00, the statutory bonds will not be required. All required Bonds shall be payable to OWNER and on forms approved by the OWNER, and shall be executed by a corporate surety in accordance with Article 7 19-1 of the Texas Insurance Code. It is agreed that the Contract shall not be in effect until such original Performance, Payment and Maintenance Bonds are delivered to and approved by the OWNER. The cost of the premium for the Performance, Payment and Maintenance Bonds, should Maintenance Bonds be required, shall be included in the CONTRACTOR's Bid Proposal. All bonds shall be issued by Texas Department of Insurance approved surety companies. 4 06 INSURANCE. The CONTRACTOR, at his own expense, shall procure, maintain and keep in force throughout the duration of the Work, and throughout the Guarantee Period, insurance as specified in Attachment No 1 hereto with regard to Workers' Compensation Insurance, and as specified in Attachment No 3 hereto with regard to all other Insurance. Such insurance shall be carried with an insurance company licensed to transact business in the State of Texas and shall cover all operations in connection with this Contract, whether performed by the CONTRACTOR or a subcontractor, or others for whom CONTRACTOR is responsible. 4 07 PERMITS AND FEES Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for all permits, licenses, and inspections necessary for proper execution and completion of the Work, and which are legally required at the time bids are received. Permits required by the City of Pearland will be issued as a NO FEE permit. 4 08 TEXAS STATE SALES TAX. Materials incorporated into this project are exempt from State Sales according to provisions of the Texas Tax Code, Chapter 151, Subsection H. 10-1012 00700-9 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT The Contractor must obtain a limited sales, excise and use tax permit or exemption certificate which shall enable him to buy the materials to be incorporated into the Work without paying tax at due time of purchase. 4 09 CONTRACTOR'S DUTY AND SUPERINTENDENCE. The CONTRACTOR shall give adequate attention to the faithful prosecution and completion of this Contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to the ENGINEER as the OWNER'S representative. The superintendent shall represent the CONTRACTOR in his absence and shall act as the agent of the CONTRACTOR, and all directions given to him shall be binding as if given to the CONTRACTOR. Adequate supervision by competent and reasonable representatives of the CONTRACTOR is essential to the proper performance of the Work' and lack of such supervision shall be an act of default, and grounds for suspending operations of the CONTRACTOR. The Superintendent cannot be removed from the project without the consent of the Owner; the Superintendent must speak and understand the English language; the Superintendent must be on site when any work on the project is being done, even when a subcontractor is performing the work. The Work, from its commencement to completion, shall be under the exclusive charge and control of the CONTRACTOR, and all risk in connection therewith shall be borne by the CONTRACTOR. Neither the OWNER nor the ENGINEER as the OWNER's representative will be responsible for the acts or,omissions of the CONTRACTOR, its subcontractors or any of its agents or employees, or any other persons performing any of the Work. 4 10 CHARACTER OF WORKERS. The CONTRACTOR agrees to employ only orderly and competent workers, skillful in the performance of the type of work required under this Contract, to do the Work, and agrees that whenever the ENGINEER shall inform him in writing that any worker or workers on the Work are, in his opinion, incompetent, unfaithful or disorderly, or in the ENGINEER's opinion, are not using their best efforts for the progress of the Work, such worker or workers shall be discharged from the Work and shall not again be employed on the Work without the ENGINEER's written consent. OWNER reserves the right to bar any person, subcontractor, or supplier found too be incompetent, unfaithful, disorderly, or not using their best efforts to progress work or considered to be a threat to the health, safety and welfare to the project or workforce. 411 LABOR, EQUIPMENT, MATERIALS, CONSTRUCTION PLANT, AND BUILDINGS. The CONTRACTOR shall provide all labor, services, tools, equipment, machinery, supplies, facilities, utilities and materials necessary in the prosecution and completion of this Contract where it is not otherwise specifically provided that the OWNER shall furnish same; and further, the CONTRACTOR shall be responsible for the care, preservation, conservation and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, all means of construction and any and all parts of the Work, whether the CONTRACTOR has been paid, partially paid or not 'paid for such Work, until the entire Work is completed and accepted. The building or placement of strulctures for housing workers or offices, or the erection of tents or other forms of protection, will be permitted only with the ENGINEER's written permission, and at 10-1012 00700-10 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT such places as the ENGINEER shall direct, and the sanitary conditions of the grounds in or about such structures shall at all times be maintained in a manner satisfactory to the ENGINEER. Any structures of any nature constructed, placed or erected by the CONTRACTOR Tor the purposes herein set out, shall be the sole responsibility of the CONTRACTOR as to the proper erection, placement or construction thereof; and the CONTRACTOR agrees to indemnify and hold the ENGINEER or OWNER harmless from any claims of any nature whatsoever brought against either of them for damages allegedly sustained by anyone by reason of the erection, placement, construction or maintenance of CONTRACTOR's buildings or structures. 4 12 SANITATION Necessary sanitary conveniences for the use of laborers and others on the Work site, properly secluded from public observation, shall be constructed and maintained by the CONTRACTOR in such manner and at such points as shall be approved by the ENGINEER, and their use shall be strictly enforced. Any structures of any nature constructed or erected by the CONTRACTOR for the purposes herein set out, shall be the sole responsibility of the CONTRACTOR as to the proper erection or construction thereof, and the CONTRACTOR agrees to indemmfy and hold the ENGINEER and OWNER harmless from any claims of any nature whatsoever brought against either of them for damages allegedly sustained by anyone by reason of the erection, construction or maintenance of CONTRACTOR's buildings. 4 13 CLEANING AND MAINTENANCE. The CONTRACTOR shall at all times keep and maintain the premises free from accumulation of debris, trash and waste. The CONTRACTOR shall remove waste, debris and trash at the end of each work day CONTRACTOR shall remove all such debris, trash and waste, tools, scaffoldmg and surplus materials, and shall leave the Work broom-clean or its equivalent, upon completion of the Work. The Work shall be left in good order and condition. In case of dispute, the OWNER may remove the debris, trash,waste and surplus materials,and charge the cost to the CONTRACTOR. 4 14 PERFORMANCE OF WORK. It is further agreed that it is the intent of this Contract that all Work must be done and all material must be furnished in accordance with the generally accepted practice for such materials furnished or work completed, unless otherwise provided in the Contract Documents. 4 15 RIGHT OF OWNER TO ACCELERATE THE WORK. If at any time the methods or equipment used by the CONTRACTOR, or the work force supplied are found to be inadequate to achieve the progress required to Substantially Complete the Work within the Contract Time, the OWNER or the ENGINEER as the OWNER's representative, may order the CONTRACTOR in wnting to supplement its forces and/or equipment, or work shifts or overtime, or otherwise improve its efficiency and rate of progress to achieve Substantial Completion of the Work within the Contract Time, and the CONTRACTOR shall comply with such order, at its own cost and expense. 416 LAYOUT OF WORK. Except as specifically provided herein, the CONTRACTOR shall be responsible for laying out work by means of construction surveying and shall accomplish this work in a manner acceptable to the ENGINEER and in conformance with the Contract Documents. 4 17 SHOP DRAWINGS. The CONTRACTOR shall submit to the ENGINEER, with such promptness as to cause no delay in his own Work or in that of any other contractor, six (6) checked copies, unless otherwise specified, of all shop and/or setting drawings and schedules 10-1012 00700- 11 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT required for the work of the various trades. Contractor will check and approve shop drawings for compliance with requirements of Contract Documents and will so certify by stamp on each drawing prior to submittal to ENGINEER. Any drawings submitted without Contractor's stamp of approval will not be considered and will be returned to him for proper submission. The ENGINEER shall pass upon them with reasonable promptness, indicating desired corrections. The CONTRACTOR shall make any corrections required by the ENGINEER, file with him two (2) corrected copies and furnish such other copies as may be needed. The ENGINEER's approval of such drawings or schedules shall not relieve the CONTRACTOR from responsibility for deviations from the Contract Documents, unless he has, in writing, called the ENGINEER's attention to such deviations at the time of the submission, and the ENGINEER has acknowledged and accepted such deviations in writing, nor shall it relieve him from responsibility for errors of any sort in shop drawings or schedules. It shall be the CONTRACTOR's responsibility to fully and completely review all shop drawings to ascertain their effect on his ability to perform the required Contract Work in accordance with the Contract Documents, and within the Contract Time. Such review by the ENGINEER shall be for the sole purpose of determining the apparent sufficiency of said drawings or schedules to result in finished improvements in conformity with the Contract Documents, and shall not relieve the CONTRACTOR of his duty as an independent contractor as previously set forth, it being expressly understood and agreed that the ENGINEER does not assume any duty to pass upon the propriety or adequacy of such drawings or schedules, or any means or methods reflected thereby, in relation to the safety of either person or property during CONTRACTOR's performance hereunder, and any action taken by the ENGINEER shall not relieve the CONTRACTOR of his responsibility and liability to comply with the Contract Documents. OWNER, CONSTRUCTION MANAGER, ENGINEER, and CONTRACTOR shall make all submittals, review comments, notes, corrections, schedules and updates, testing results, payment applications, instructions and other communications by means of the OWNER'S Pro-Trak. The OWNER, ENGINEER and CONTRACTOR shall each retain such hard copies form this system as are required for their specific record keeping requirements. No documents shall be removed from this system or destroyed except those being replaced by the systems protocols as a latest version document. All requirements for written communications, submittals, comments, instructions or other documents processed by means of this system shall have the same legal or time sensitive status as if they had been hand delivered in;hard copy to their intended addressee. 4 18 ENGINEER-CONTRACTOR RELATIONSHIP, OBSERVATIONS It is agreed by the CONTRACTOR that the !ENGINEER, as the OWNER's representative, shall be and is hereby authorized to appoint such subordinate engineers, representatives or observers as the said ENGINEER may from time to time deem proper to observe the materials furnished and the Work done under this Agreement. The CONTRACTOR shall furnish all reasonable aid and assistance required by the subordinate engineers, representatives or observers for the proper observation and examination of the work. The CONTRACTOR shall regard and obey the directions and instructions of any subordinate engineers, representatives or observers so appointed, when such directions and instructions are consistent with the obligations of this Agreement and the Contract Documents, provided, however, should the CONTRACTOR object to any orders by any 10-1012 00700- 12 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT subordinate engineer, representative or observer, the CONTRACTOR may, within three (3) days, make written appeal to the ENGINEER for his decision. 4 19 OBSERVATION AND TESTING The OWNER or the ENGINEER as the OWNER's representative shall have the right at all reasonable times to observe, inspect and test the Work. The CONTRACTOR shall make all necessary arrangements and provide proper facilities and access for such observation, inspection and testing at any location wherever Work is in preparation or progress. The CONTRACTOR shall ascertain the scope of any observation, inspection or testing which may be contemplated by the OWNER or the ENGINEER and shall give ample notice as to the time each part of the Work will be ready for such observation, inspection or testing. The OWNER or the ENGINEER may reject any Work found to be defective or not in accordance with the Contract Documents, regardless of the stage of its completion or the time or place of discovery of such deficiencies, and regardless of whether the ENGINEER has previously accepted the Work through oversight or otherwise. If any Work is covered without approval or consent of the OWNER, it must, if requested by the OWNER or the ENGINEER, be uncovered for examination, at the sole expense of the CONTRACTOR. In the event that any part of the Work is being fabricated or manufactured at a location where it is not convenient for the OWNER or the ENGINEER to make observations of such Work or require testing of said Work, then in such event, the OWNER or the ENGINEER may require the CONTRACTOR to furnish the OWNER or the ENGINEER with certificates of inspection, testing or approval made by independent persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the Contract Documents. If any Work, which is required to be inspected, tested or approved, is covered up without written approval or consent of the OWNER or the ENGINEER, it must, if requested by the OWNER or the ENGINEER, be uncovered for observation and testing, at the sole expense of the CONTRACTOR. The cost of all such inspections, tests and approvals shall be borne by the CONTRACTOR unless otherwise provided herein. Any Work which fails to meet the requirements of such tests, inspections or approval, and any Work which meets the requirements of any such tests or approval but does not meet the requirements of the Contract Documents shall be considered defective. Such defective Work and any other work affected thereby shall be corrected at the CONTRACTOR'S expense. Neither observations by the OWNER or by the ENGINEER, nor inspections, certifications, tests or approvals made by the OWNER, the ENGINEER or other persons authorized under this Agreement to make such inspections, tests or approvals, shall relieve the CONTRACTOR from his obligation to perform the Work in accordance with the requirements of the Contract Documents. 4.20 DEFECTS AND THEIR REMEDIES It is further agreed that if the Work or any part thereof or any material brought on the site of the Work for use in the Work or selected for the same,-shall be deemed by the ENGINEER as unsuitable or not in conformity with the Contract Documents, the CONTRACTOR shall, after receipt of written notice thereof from the ENGINEER, forthwith remove such matenal and rebuild or otherwise remedy such Work so that it shall be in full accordance with this Contract, It is further agreed that any such remedial action contemplated herein shall be at CONTRACTOR's expense. 10-1012 00700- 13 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.21 LIABILITY FOR PROPER PERFORMANCE. Engineering construction drawings and specifications, as well as any additional instructions and information concerning the Work to be performed, passing from or through the ENGINEER, shall not be interpreted as requiring or allowing the CONTRACTOR to deviate from the Contract Documents, the intent of such drawings, specifications and any other such instructions being to define with particularity the agreement of the parties as to Work the CONTRACTOR is to perform. CONTRACTOR shall be fully and completely liable and contractually bound, at his own expense, for design, construction, installation and use or non-use of all items and methods incident to the performance of the Contract, including, without limitation, the adequacy of all temporary supports, shoring, bracing, scaffolding, machinery or equipmnt, safety precautions or devices, similar items or devices used by him during construction, and work performed either directly or incident to construction, and for all loss, damage or injury incident thereto, either to person or property, whether such damage be suffered by the ENGINEER,the OWNER or any other person not a party to this Contract. Any review of Work in progress or any visit or observation during construction, or any clarification of Contract Documents by the ENGINEER or OWNER, or any agent, employee or representative of either of them, whether through personal observation on the Project site or by means of approval of shop drawings for construction or construction processes, or by other means or methods, is agreed by the CONTRACTOR to be for the purpose of observing the extent and nature of Work completed or being performed, as measured against the Contract Documents, or for the purpose of enabling the CONTRACTOR to more fully understand the Contract Documents so that the completed construction Work will conform thereto, and shall in no way relieve the CONTRACTOR from full and complete responsibility for proper performance of his Work on the Project, including, without limitation, the propriety of means and methods of the CONTRACTOR in performing said Contract, and the adequacy of any designs, plans or other facilities for accomplishing such performance)Any action by the ENGINEER or the OWNER in visiting or observing during construction, or any clarification of Contract Documents shall not constitute a waiver of CONTRACTOR'S liability for damages as herein set out. Deviation by the CONTRACTOR from Contract Documents, whether called to the CONTRACTOR's attention or not, shall in no way relieve CONTRACTOR from his responsibility to complete all work in accordance with said Contract Documents, and further shall not relieve CONTRACTOR of his liability for loss, damage or injury4s herein set out. 4.22 PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC The CONTRACTOR shall be solely responsible for the safety of himself, his employees and persons entering the project site, as well as for the protection of the improvements being erected and the property of himself or any other person, as a result of his operations hereunder The CONTRACTOR shall take out and procure a policy or policies of Workers' Compensation Insurance with an insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workers' Compensation laws of the State of Texas. The CONTRACTOR shall at all times exercise reasonable precautions for the safety of employees and others on or near the Work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and,other physical hazards shall be guarded, as a minimum, in accordance with the "Manual of Accident Prevention in Construction" of the Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The CONTRACTOR shall provide all necessary machinery guards, safe walkways, ladders, bridges, gangplanks, barricades, fences, traffic control,warning signs and other safety devices. 10-1012 00700- 14 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT No alcoholic beverages, non-prescription drugs, or unsafe practices shall be allowed on the Work- site. CONTRACTOR shall dismiss anyone participating in any of the above from the Work site for the duration of the Project. Only prescription drug uses with a doctor's authorization to perform construction activities shall be allowed on the Work site. Violation of this provision is a default under the Contract. The use, possession, sale, transfer, purchase or being under the influence of alcohol, drugs or any other illegal or unlawful substance by CONTRACTOR or CONTRACTOR's employees, or CONTRACTOR's subcontractors and employees at any time at the Work site or while on company business is prohibited. CONTRACTOR shall institute and enforce appropriate drug testing guidelines and program. All accidents or injuries to CONTRACTOR's employees working on the job site must be reported verbally and in writing to the ENGINEER immediately, and within no more than eight(8)hours. The safety precautions actually taken and their.adequacy shall be the sole responsibility of the CONTRACTOR, in his sole discretion as an independent contractor Inclusion of this paragraph in the Agreement, as well as any notice which may be given by the OWNER or the ENGINEER as the OWNER's representative concerning omissions under thus paragraph as the Work progresses, are intended as reminders to the CONTRACTOR of his duty and shall not be construed as any assumption of duty by ENGINEER, or OWNER's representative to supervise safety precautions by either the CONTRACTOR or any of his subcontractors. 4.23 PROTECTION OF ADJOINING PROPERTY The CONTRACTOR shall employ proper means to protect the adjacent or adjoining property or properties in any way encountered, which might be injured or seriously affected by any process of construction to be undertaken under this Agreement, from any damage or injury by reason of said process of construction, and he shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent or adjoining property THE CONTRACTOR AGREES TO INDEMNIFY, DEFEND, SAVE AND HOLD HARMLESS THE CONSTRUCTION MANAGER, OWNER AND ENGINEER AGAINST ANY CLAIM OR CLAIMS FOR DAMAGES, LOSS, COSTS OR EXPENSES, INCLUDING BUT NOT LIMITED TO ATTORNEY'S FEES, DUE TO ANY INJURY TO ANY ADJACENT OR ADJOINING PROPERTY, ARISING OR GROWING OUT OF THE PERFORMANCE OF THE CONTRACT, REGARDLESS OF WHETHER OR NOT SUCH DAMAGE, LOSS, COST OR EXPENSE IS CAUSED IN PART BY THE NEGLIGENCE, GROSS NEGLIGENCE OR STRICT LIABILITY OF OWNER AND/OR ENGINEER. 4.24 PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS, MATERIALMEN AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES. THE CONTRACTOR AGREES THAT HE WILL PROMPTLY PAY WHEN DUE, AND WILL INDEMNIFY, SAVE AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ALL CLAIMS GROWING OUT OF THE DEMANDS OF SUBCONTRACTORS, LABORERS, WORKERS, MECHANICS, MATERIALMEN AND FURNISHERS OF MACHINERY AND PARTS THEREOF, EQUIPMENT, POWER TOOLS AND ALL SUPPLIES, INCLUDING COMMISSARY, INCURRED IN THE FURTHERANCE OF THE PERFORMANCE OF THIS CONTRACT When so desired by the OWNER, the CONTRACTOR shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. If the CONTRACTOR fails to do so, then the OWNER may, at the option of the OWNER, either pay directly any unpaid bills of which the OWNER has written notice, or withhold from the CONTRACTOR's unpaid compensation a sum of money deemed reasonably 10-1012 00700- 15 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT sufficient to liquidate any and all such claims until satisfactory evidence is furnished that all liabilities have been fully discharged, whereupon payments to the CONTRACTOR shall be resumed in full, in accordance with the terms of this Contract. Any and all communications between any parties under this paragraph shall be in writing. Nothing contained in this paragraph or this Agreement shall create, establish or impose any relationship, contractual or otherwise,between OWNER and any subcontractor, laborer or supplier of CONTRACTOR, nor shall it create, establish or impose any duty upon OWNER to pay or to see to the payment of any subcontactor, laborer or supplier of CONTRACTOR. 4.25 PROTECTION AGAINST ROYALTIES OR PATENTED INVENTION The CONTRACTOR shall pay all royalties and license fees and shall provide for the use of any design, device, material or process covered by letters patent or copyright, by suitable legal agreement with the patentee or owner thereof THE CONTRACTOR SHALL DEFEND ALL SUITS OR CLAIMS FOR INFRINGEMENT OF ANY PATENT OR COPYRIGHT AND SHALL INDEMNIFY, SAVE AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY LOSS OR LIABILITY ON ACCOUNT THEREOF, EXCEPT SUCH SUITS AND CLAIMS ARISING OUT OF A PARTICULAR DESIGN, DEVICE, MATERIAL OR PROCESS OR THE PRODUCT OF A PARTICULAR MANUFACTURER OR MANUFACTURERS SPECIFIED OR REQUIRED BY THE OWNER, PROVIDED, HOWEVER, IF CHOICE OF ALTERNATE DESIGN, DEVICE, MATERIAL OR PROCESS IS ALLOWED TO THE CONTRACTOR, OR IF CONTRACTOR KNEW OR SHOULD HAVE KNOWN OF THE PATENT OR COPYRIGHT AND FAILED TO PROMPTLY NOTIFY OWNER IN WRITING, THEN THE CONTRACTOR SHALL INDEMNIFY, DEFEND, SAVE AND HOLD THE OWNER HARMLESS FROM ANY LOSS OR LIABILITY ON ACCOUNT THEREOF 4.26 INDEMNIFICATION THE CONTRACTOR AGREES TO DEFEND, INDEMNIFY AND HOLD THE ENGINEER AND THE OWNER HARMLESS FROM ANY CLAIMS OR DEMANDS OF ANY NATURE WHATSOEVER MADE BY ANY EMPLOYEE, EMPLOYEES, AGENTS OR SUBCONTRACTORS OF CONTRACTOR, OR BY ANY UNION, TRADE ASSOCIATION, WORKER'S ASSOCIATION OR OTHER GROUPS, ASSOCIATIONS OR INDIVIDUALS,ALLEGEDLY REPRESENTING EMPLOYEES OF THE CONTRACTOR, IN ANY DISPUTE BETWEEN THE CONTRACTOR AND HIS EMPLOYEES, DIRECTLY OR INDIRECTLY INVOLVING, GROWING OUT OF OR ARISING FROM CLAIMS BY SUCH EMPLOYEES FOR WAGES, SALARY, COMPENSATION, BENEFITS, WORKING CONDITIONS OR ANY OTHER SIMILAR COMPLAINT OR CLAIM WHICH MAY BE MADE. THE CONTRACTOR, HIS SURETIES AND INSURANCE CARRIERS SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS THE OWNER AND THE ENGINEER AND THEIR RESPECTIVE OFFICERS, REPRESENTATIVES, AGENTS AND EMPLOYEES FROM AND AGAINST ALL DAMAGES, ' CLAIMS, LOSSES, DEMANDS, SUITS, LIABILITIES, JUDGMENTS AND COSTS OF ANY CHARACTER WHATSOEVER, INCLUDING REASONABLE ATTORNEY'S IFEES AND EXPENSES, AND SHALL BE REQUIRED TO PAY ANY JUDGMENT THEREFOR, WITH COSTS, WHICH MAY BE OBTAINED AGAINST THE OWNER AND/OR THE ENGINEER OR ANY OF THEIR OFFICERS, ' REPRESENTATIVES, AGENTS OR EMPLOYEES, ARISING OUT OF OR RESULTING FROM OR ALLEGEDLY ARISING OUT OF OR RESULTING FROM THE PERFORMANCE 10-1012 00700- 16 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT J OF THE WORK, PROVIDED THAT ANY SUCH DAMAGES, CLAIM, LOSS, DEMAND, SUIT, LIABILITY, JUDGMENT, COST OR EXPENSE. (A) ARISES OUT OF OR RESULTS FROM IN WHOLE OR IN PART, OR ALLEGEDLY ARISES OUT OF OR RESULTS FROM IN WHOLE OR IN PART, ANY BREACH OF THIS AGREEMENT OR BREACH OF WARRANTY BY CONTRACTOR, OR (B) IS ATTRIBUTABLE TO BODILY INJURY, SICKNESS, DISEASE OR DEATH OR INJURY TO OR DESTRUCTION OF TANGIBLE PROPERTY, INCLUDING THE LOSS OF USE RESULTING THEREFROM, AND IS CAUSED IN WHOLE OR IN PART OR IS ALLEGEDLY CAUSED IN WHOLE OR IN PART BY ANY NEGLIGENT ACT OR OMISSION OF THE CONTRACTOR, ANY SUBCONTRACTOR, THEIR AGENTS OR EMPLOYEES OR ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY ANY ONE OF THEM OR ANYONE FOR WHOSE ACTS ANY OF THEM MAY BE LIABLE, REGARDLESS OF WHETHER OR NOT IT IS CAUSED IN PART OR ALLEGEDLY CAUSED IN PART BY THE NEGLIGENCE, GROSS NEGLIGENCE OR STRICT LIABILITY OF OWNER, ENGINEER AND/OR A PARTY INDEMNIFIED HEREUNDER. Notwithstanding the foregoing or anything in the Agreement to the contrary, in accordance with the provisions of Section 130 002 of the Texas Civil Practice and Remedies Code, CONTRACTOR shall not be obligated to indemnify or hold harmless the ENGINEER, his agents, servants or employees, from liability for damage that is caused by or results from defects in plans, designs or specifications prepared, approved or used by the ENGINEER, or negligence of the ENGINEER in the rendition or conduct of professional duties called for or arising out of any construction contract and the plans, designs or specifications that are a part of the construction contract, and anses from personal injury or death, property injury, or any other expense that arises from personal injury, death, or property injury This indemnity agreement is a continuing obligation, and shall survive notwithstanding completion of the Work, Final Payment, expiration of the warranty period, termination of the Contract, and abandonment or takeover of the Work. CONTRACTOR's indemnification obligations hereunder shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the CONTRACTOR or a subcontractor under workers' compensation acts, disability benefit acts or other employee benefit acts, and shall not be limited by any limitation on amounts or coverage of insurance provided or to be provided under this Contract. 4.27 LOSSES FROM NATURAL CAUSES All loss, cost, expense or damage to the `'CONTRACTOR arising out of the nature of the Work to be done or from any unforeseen circumstances;in the prosecution of the same, or from the action of the elements, or from unusual obstructions or difficulties which may be encountered in the prosecution of the Work, shall be sustained and borne by the CONTRACTOR at his own cost and expense. 10-1012 00700- 17 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.28 GUARANTEE. The CONTRACTOR hereby guarantees all the Work under the Contract to be free from defects or deficiencies in material in every particular and free from defects or deficiencies in workmanship, and against unusual damage from proper and usual use; and agrees to replace or to re-execute without cost to the OWNER such Work as may be found to be defective, deficient or otherwise not in conformance with the Contract Documents, and to make good all damages caused to other work or material, due to such defective Work or due to its required replacement or re-execution. This guarantee shall cover a period of one year from the date of Substantial Completion or Partial Substantial Completion of Work under the Contract, as evidenced by the Certificate of Substantial Completion. Neither the Certificate of Substantial Completion, Final Payment, nor any provision in the Contract Documents shall relieve the CONTRACTOR of the responsibility for defective, deficient or non-conforming material or workmanship during the period covered by the guarantee. The one-year period of guarantee will not limit the OWNER'S other rights under common law with respect to any defects, deficiencies or non-conforming Work discovered after one year If this one-year guarantee conflicts with other warranties or guarantees, the longer period of warranty or guarantee will govern. 5.0 PROSECUTION AND PROGRESS 5 01 TIME AND ORDER OF COMPLETION It is the meaning and intent of this Contract, unless otherwise herein specifically provided, that the CONTRACTOR shall be allowed to prosecute his Work at such times and seasons, in such order of precedence, and in such manner as shall be most conducive to economy of construction, provided, however, that the order and the time of prosecution shall be such that the Work shall be Substantially Completed as a whole and in part, in accordance with this Contract and the Contract Time; provided, also, that when the OWNER is having other work done, either by contract or by his own forces, the ENGINEER may direct the time and manner of constructing the Work done under this Contract, so that conflict will be avoided and the construction of the various works being done for the OWNER shall be harmonized, and the CONTRACTOR shall fully cooperate and coordinate its Work with OWNER or such other contractors. The CONTRACTOR shall submit, an updated schedule with every pay estimate for review by the ENGINEER, schedules which shall show the order in which the CONTRACTOR proposes to carry on the Work, with dates on which the CONTRACTOR will start the several parts of the work, and estimated dates of completion of the several parts. Such schedules shall show completion of the Work within the Contract Time, and/or shall show such recovery efforts as CONTRACTOR intends to undertake in the event Substantial Completion of the Work is delayed. 5 02 EXTENSION OF TIME. The CONTRACTOR agrees that he has submitted his Bid Proposal in full recognition of the time required for the completion of this Project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions as hereinafter set forth, and that he shall not be entitled to, nor will he request, an extension of time on this Contract, except when Substantial Completion of the Work has been delayed solely by strikes, lockouts, fires, Acts of God, or by any other cause which the ENGINEER shall decide justifies the delay The CONTRACTOR shall give the ENGINEER prompt notice, in writing and within three (3) days of the start of any such delay, of the cause of any such delay, and its estimated effect on the Work and the schedule for completion of the Work. Upon receipt of a wntten request for an extension of the Contract Time from the CONTRACTOR, supported by relevant and all requested documentation, the 10-1012 00700- 18 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ENGINEER shall submit such written request, together with his wntten recommendation, to the OWNER for consideration. If the delay is not attributable in whole or in part to any act or omission of CONTRACTOR, its subcontractors or suppliers, and if the OWNER determines that CONTRACTOR is entitled to an extension of time under the terms of the Contract, the OWNER shall grant an extension of time for Substantial Completion of the Work, sufficient to compensate for the delay, and such extension of time shall be CONTRACTOR's sole and exclusive remedy, except as may be otherwise provided herein. No extensions of Contract Time shall be made for delays occurring prior to the Contractor's mobilization as defined in Section 01505 MOBILIZATION The Contract Time as defined in the Bid Proposal and other sections herein incorporates 40 Rain Days per calendar year or an average of 3.33 days per calendar month. The CONTRACTOR is required to keep record of all weather related delays and to submit the monthly count on each Pay Application. The Owner's Representative shall review and sign off on this record as a part of the Pay Application approval process every month. If, during preparation of the Balancing Change Order, the status of the work progress requires an extension of the Contract Time, Impact Days shall be added to the Completion Date equal to the total number of Weather or Impact Days approved less the original 40 days resident in the original Contract Time. The Addition of Weather or Impact Days will only alter the Contract Time when added by Change Order If the Work is completed prior to the Completion Date, No Days will be added. The addition of Weather or Impact Days shall be the CONTRACTOR's sole remedy for delays to the completion of the Work and their addition to the Contract Time shall not affect the Contract Price through any "per diem" adjustment to the General Conditions costs, Temporary Facilities costs or any other costs associated with the extension of the Contract Time. 5 03 HINDRANCES AND DELAYS In executing the Contract, the CONTRACTOR agrees that in undertaking to complete the Work within the time herein fixed, he has taken into consideration and made allowances for all interference, disruption, hindrances and delays incident to such Work, whether growing out of delays in securing material, workmen or otherwise. No claim shall be made by the CONTRACTOR for damages, loss, costs or expense resulting from interference, disruption, hindrances or delays from any cause during the progress of any portion of the Work embraced in this Contract, except where the Work is stopped or suspended by order of the OWNER's representative and such stoppage or suspension is not attributable to any act or omission of CONTRACTOR. 5 04 SUSPENSION OF WORK. OWNER may, without cause, order the CONTRACTOR in writing to suspend the Work, in whole or in part, for such period of time as OWNER may request. The Contract Price and/or Contract Time shall be adjusted for any increase in the cost of or the time required for performance of the Work caused by such suspension. No adjustment shall be made to the extent performance was or would have been suspended by a cause for which CONTRACTOR is responsible, or to the extent an adjustment is made or denied under another provision of the Contract Documents. 5 05 LIQUIDATED DAMAGES FOR DELAY It is understood and agreed that time is of the essence, and that the CONTRACTOR will commence the Work on the date specified herein or in any Notice to Proceed, and will Substantially Complete the Work within the Contract Time. It is expressly understood and agreed, by and between the CONTRACTOR and the OWNER, that the time for the Substantial Completion of the Work described herein is reasonable time for the completion of the same, taking into consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality The CONTRACTOR further 10-1012 00700- 19 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT agrees that a failure to complete on time will cause damage to the OWNER and that such damages cannot be accurately measured or that ascertainment will be difficult. Therefore, the parties agree that for each and every calendar day the Work or any portion thereof shall remain uncompleted after the expiration of the Contract Time, the CONTRACTOR shall pay, as liquidated damages and as a reasonable estimate of OWNER's damages, and not as a penalty, the amount set out in the Standard Form of Agreement. However, the foregoing agreement as to liquidated damages constitutes only an agreement by the OWNER and the CONTRACTOR as to the amount of damages which the OWNER will sustain by reason of the CONTRACTOR'S!failure to complete the work within the Contract Time. Should the OWNER suffer damage by reason of any other breach by CONTRACTOR, the OWNER may recover such actual damages in addition to any liquidated damages due. The OWNER shall have the right to deduct and withhold the amount of any and all such damages whether it be the minimum amount stipulated above or otherwise, from any monies owing by it to said CONTRACTOR, or the OWNER may recover such amount from the CONTRACTOR and the sureties of his bond, all of such remedies shall be cumulative and the OWNER shall not be required to elect any one nor be deemed to have made an election by proceeding to enforce any one remedy 5 06 CHANGE OF CONTRACT TIME The Contract Time may only be changed by a Change Order Any claim for an adjustment of Contract Time shall be based on written notice delivered by the party making such claim to the other party and to the ENGINEER promptly, but in no event later than ten (10) days after the event-giving rise to the claim. Notice of the extent of the claim, along with supporting data, shall be delivered within thirty (30) days of the occurrence and shall be accompanied by the claimant's written representation that the adjustment claimed is the entire adjustment to which the claimant has reason to believe it is entitled as a result of the occurrence of said event. All claims for adjustment in Contract Time shall be determined by the ENGINEER in accordance with the requirements of this paragraph. Contractor shall submit, as a minimum,the following data. A. Information showing that the time requested is not included in the existing Contract and in addition to the Contract. B Information documenting that the number of days requested is accurate for the event. C Revised, current construction schedule showmg that the time requested affects the project's critical path. 5 07 DELAYS BEYOND OWNER'S AND CONTRACTOR'S CONTROL. Where CONTRACTOR is prevented from completing any part of the Work within the Contract Time due to delays beyond the control of the OWNER and the CONTRACTOR, including, but not limited to, interference by utility owners or other contractors performing other work, Contractor shall be entitled to an extension of the Contract Time in an amount equal to the time lost. CONTRACTOR shall not be entitled to any increase in Contract Price as a result of such delays. IN NO EVENT SHALL OWNER BE LIABLE TO CONTRACTOR FOR DAMAGES ARISING OUT OF OR RESULTING FROM (i) Delays caused by, or within the control of, the CONTRACTOR, or (ii) Delays beyond the control of both parties mcluding, but not limited to, interference by utility owners or other contractors performing other work, fires, floods, epidemics, abnormal weather conditions, acts of God, even if such delays are due in part to the negligence, other fault,breach of contract or warranty, violation of the Texas Deceptive Trade Act, or strict liability without regard 10-1012 00700-20 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT to fault of OWNER. An extension of Contract time shall be CONTRACTOR's sole and exclusive remedy for any such delays. Delays attributed to, and within the control of, a Subcontractor or Supplier shall be deemed to be delays within the control of the CONTRACTOR. 6.0 MEASUREMENT AND PAYMENT 6.01 DISCREPANCIES AND OMISSIONS. If the CONTRACTOR knows or reasonably should have known of any discrepancies or omissions in the Contract Documents, he shall notify the ENGINEER and obtain a clarification by Addendum before the bids are received, and if no such request is received by the ENGINEER prior to the opening of bids, then it shall be considered that the CONTRACTOR fully understands the Work to be performed and has provided sufficient sums in his Bid Proposal to complete the Work in accordance with the Contract Documents. It is further understood that any request for clarification must be submitted no later than five(5) days prior to the opening of bids. 6 02 QUANTITIES AND MEASUREMENTS No extra or customary measurements of any kind will be allowed, but the actual measured and/or computed length, area, volume, number and weight only shall be considered,unless otherwise specifically provided. 6 03 ESTIMATED QUANTITIES This Agreement, including the Contract Documents, and including any estimates contained therein, is intended to convey all Work to be done and material to be furnished hereunder Where the estimated quantities are shown for the various classes of Work to be done and material to be furnished under this Contract, they are approximate and are to be used only as a basis for estimating the probable cost of the Work and for comparing the Bid Proposals offered for the Work. It is understood and agreed that the actual amount of Work to be done and the materials to be furnished under this Contract may differ from the estimates and that the items listed or estimated quantities stated, and/or any difference between estimated and actual Work, shall not give rise to a claim by the CONTRACTOR against the OWNER for loss, cost, expense, damages,unit price adjustment, quantity differences,unrecovered overhead or lost or anticipated profits, or other compensation. 6 04 PRICE OF WORK. It is agreed that it is the intent of this Contract,that all Work described in the Bid Proposal, and Contract Documents, is to be done for the pnces bid by the CONTRACTOR and that such pnces shall include all appurtenances necessary to complete the Work in accordance with the intent of these Contract Documents as interpreted by the ENGINEER, and all costs, expenses, bond and insurance premiums, taxes, overhead, and profit. In consideration of the furnishing of all the necessary labor, equipment and material and the completion of all Work by the CONTRACTOR, and upon the completion of all Work and the delivery of all matenals embraced in this Contract in full conformity with the Contract Documents, the OWNER agrees to pay to the CONTRACTOR the pnces set forth in the Standard Form of Agreement, OWNER and CONTRACTOR agree that the Contract is a unit cost agreement, unless stated otherwise, and that the final Contract amount is equal to the unit cost multiplied by the number of units authonzed,installed and approved by the Owner The OWNER does not assume any obligation to pay for any services or material not actually authonzed and used. The CONTRACTOR hereby agrees to receive such prices as payment m full for furnishing all materials and all labor required for the aforesaid Work, and for 10-1012 00700-21 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT all expenses incurred by him, and for full performance of the Work and the whole thereof in the manner and according to this Agreement, Contract Documents, and the requirements of the ENGINEER. 6 05 PAYMENTS No payments made or approvals or certificates given shall be considered as conclusive evidence of the performance of the Contract, either in whole or in part, nor shall any certificate, approval or payment be considered as acceptance of defective, deficient or non-conforming Work. CONTRACTOR shall, at any time requested during the progress of the Work, furnish the OWNER or the ENGINEER with an affidavit showing the CONTRACTOR's total outstanding indebtedness in connection with the Work. Before Final Payment is made, the CONTRACTOR shall satisfy the OWNER, by affidavit or otherwise, that there are no unpaid claims due subcontractors, suppliers or laborers by reason of any Work under the Contract. Acceptance by CONTRACTOR of Final Payment shall constitute a waiver of any and all claims of whatsoever nature against OWNER, arising out of or related to the Contract, or the Work, or any acts or omissions of OWNER or ENGINEER, which have not theretofore been timely filed as provided in this Contract. 6 06 PARTIAL PAYMENTS When the Contract Price is a lump sum amount,prior to the first Application for Payment, CONTRACTOR shall submit to ENGINEER for review and approval a Schedule of Values, which shall fairly allocate the entire Contract Price among the various portions of the Work and shall be prepared in such form and supported by such data to substantiate its accuracy as the ENGINEER may reasonably require. The Schedule of Values shall follow the trade divisions of the Specifications so far as practicable. Upon approval, this Schedule of Values shall be used by ENGINEER as the basis for reviewing the Contractor's Application for Payment. Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. On or before the tenth day of each month, the CONTRACTOR shall prepare and submit to the ENGINEER, for approval or correction, an application for partial payment, being a statement showing as completely as practicable, the agreed unit quantities and extended total value of the Work done by the CONTRACTOR up to and including the twenty-fifth day of the preceding month, said statement shall also include the value of all conforming materials to be fabricated into the Work and stored in accordance with manufacturer's recommendations and as approved by the OWNER or ENGINEER at the Work site only No payment will be made for materials stored until OWNER has approved in writing storage at the Work site. The ENGINEER shall then review such statement of unit quantities and application for partial payment and the progress of the Work made by the CONTRACTOR and, within ten days after the date ENGINEER receives CONTRACTOR's application for payment, if the application is found to be accurate and correct and the WORK conforming to the requirements of the Contract Documents, the ENGINEER shall certify the application for partial payment and shall deliver his preliminary certification for payment to the OWNER and the CONTRACTOR, or, if the ENGINEER finds that CONTRACTOR's application for payment contains an error or is otherwise disputed, he shall notify CONTRACTOR of such error or dispute, and shall prepare a preliminary certificate for partial payment for the undisputed amount of the application for payment due CONTRACTOR, and deliver it to the OWNER and CONTRACTOR. ENGINEER'S notice to CONTRACTOR that a bona fide dispute for payment exists shall include a list of the specific reasons for nonpayment. All payment applications made by CONTRACTOR and delivered to ENGINEER and all verifications and certification of such applications shall be made and transmitted within the Pro- Trak system and signed with the appropriate-electronic signatures as provided for in the software. 10-1012 00700-22 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Such applications for payment shall not be considered complete unless accompamed by the CONTRACTOR'S Partial Waiver of Lien and Payment Affidavit, Section 00615, duly executed by an authorized representative of the CONTRACTOR and reflecting the correct corresponding amount of the payment application. The OWNER shall then pay the CONTRACTOR, within thirty (30) days of the date of ENGINEER's receipt of the application for payment, the undisputed balance due, less applicable retamage, and further less all previous payments and all further sums that may be retained or withheld by the OWNER under the terms of this'Agreement. CONTRACTOR may submit a corrected application for payment after its receipt of the ENGINEER's notice of error or dispute, and such corrected application for payment shall be reviewed by the ENGINEER and disputed or paid under the same procedure and within the same time limits set out above. As a condition of any progress payment under this Agreement, CONTRACTOR shall execute and deliver to ENGINEER and OWNER a full release of all claims, direct or indirect, at law or in equity, arising out of or related to the Work to date, excluding retainage or any claims previously submitted as required under the terms of the Contract, and specifically identified and excluded by CONTRACTOR in the release. OWNER shall be entitled to retain from each progress payment five percent (5%) of the amount thereof. Such retainage shall be retained until Final Completion and satisfaction of all conditions for Final Payment. It is understood, however, that in case the whole Work be near to completion, as certified by the ENGINEER, and some unexpected or unusual delay occurs, through no neglect or fault on the part of the CONTRACTOR, the OWNER may, upon written recommendation of the ENGINEER, pay a reasonable and equitable portion of the retained percentage to the CONTRACTOR, or the CONTRACTOR, at the OWNER'S option, may be relieved of the obligation to fully complete the Work, and thereupon, the CONTRACTOR shall receive, at the OWNER'S option, payment of the balance due him under the Contract for Work completed in accordance with the Contract Documents, subject to OWNER's rights to otherwise withhold or retain payments, and subject to the conditions set forth under"6 08 FINAL PAYMENT " The Owner at its option and in compliance with Texas law may reduce retainage to less than the above-stated percentages. 6 07 USE OF COMPLETED PORTIONS & PUNCHLIST The OWNER shall have the right to take possession of and use any completed or partially completed portions of the Work, notwithstanding that the time for completing the entire work or such portions may not have expired, but such taking possession and use shall not be deemed an acceptance of any work not completed in accordance with the Contract Documents. If such pnor use increases the cost of or delays the Work, the CONTRACTOR shall promptly and within three (3) days of OWNER's taking possession, give OWNER written notice of same, and CONTRACTOR may be entitled to such extra compensation or extension of time, or both, as may be determined in accordance with the provisions of this Agreement. 6 08 SUBSTANTIAL COMPLETION The CONTRACTOR shall notify the OWNER AND ENGINEER, by letter executed by a duly qualified officer of CONTRACTOR, that in CONTRACTOR's opinion, the Work of the Contract, or an agreed portion thereof, is "Substantially Complete" Such notification shall mclude a list of all outstanding or incomplete items. Upon receipt, and within a reasonable time thereafter, of such notice, the ENGINEER and the CONTRACTOR shall jointly perform a walk-through and inspection of the Work to determine 10-1012 00700-23 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT the status of all or the identified portion of the work, and the ENGINEER shall prepare a detailed list of unfinished, incomplete, defective and/or non-conforming. Work ("Punchlist"). If the ENGINEER determines that the Work is Substantially Complete in accordance with the Contract Documents, the ENGINEER shall issue to the OWNER and the CONTRACTOR a Certificate of Substantial Completion. OWNER shall have seven (7) days after receipt of Certificate to make written objection to the ENGINEER as to any provision of the Certificate or the attached list of non-conforming work. If ENGINEER concludes that the Work is not Substantially Complete, ENGINEER will, within fourteen (14) days, notify CONTRACTOR of the reason he believes the Work is not Substantially Complete. Upon Substantial Completion of the Work, ENGINEER will deliver to OWNER and CONTRACTOR a written recommendation as to division of responsibilities, pending final payment and acceptance, with respect to security, maintenance, utilities and damage to the Work, except as otherwise provided in the Certificate of Substantial Completion. NEITHER THE SUBSTANTIAL COMPLETION OF THE WORK, NOR THE OMISSION OF AN ITEM FROM THE PUNCHLIST, SHALL EXCUSE THE CONTRACTOR FROM PERFORMING ALL OF THE WORK UNDERTAKEN, WHETHER OF A MINOR OR MAJOR NATURE, AND THEREBY COMPLETING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS The Certificate of Substantial Completion shall establish the time period within which CONTRACTOR shall complete the Work for Final Acceptance by the Owner and ENGINEER. 6 08-1 OWNER shall have the right to exclude CONTRACTOR from the Work after the date of Substantial Completion, for security requirement reasons. OWNER may establish an access procedure to facilitate CONTRACTOR's uninterrupted access to the Work for the purposes of completing and correcting all items on the Punchlist in an expeditious manner 6 09 FINAL PAYMENT Final payment of the Retainage withheld from the Contract Price shall be made by the OWNER to the CONTRACTOR at such time as. (a) the Work, including all Change Orders and including all Punchlist work, has been fully completed in strict accordance with the Contract Documents, (b) ' the Contract has been fully performed except for the CONTRACTOR's responsibility to correct nonconforming Work during the warranty period set forth in the Contract Documents, and to satisfy other requirements, if any, which necessarily survive final payment; (c) CONTRACTOR delivers to OWNER a certificate evidencing that insurance required by the Contract Documents to remain in force after final payment is currently in effect and will not be cancelled or allowed to expire until at least 30 days prior written notice has been given to OWNER, (d) CONTRACTOR delivers to OWNER a Consent of Surety, if any,to final payment; (e) CONTRACTOR delivers to OWNER a complete set of As-Built Drawings, reflecting all deviations from the Plans, Specifications and approved shop drawings in the Work actually constructed, and delivers all maintenance and operating manuals and/or instructions, 10-1012 00700-24 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (f) CONTRACTOR delivers to OWNER all building certificates required prior to occupancy and all other required inspections/approvals/acceptances by city, county; state governmental entities or other authorities having jurisdiction, (g) CONTRACTOR delivers to OWNER assignments of all guarantees and warranties from subcontractors,vendors, suppliers or manufacturers, as well as names, addresses and telephone numbers of contacts for each subcontractor,vendor, supplier or manufacturer; (h) CONTRACTOR removes all equipment,tools, temporary facilities, surplus materials and rubbish from the site, and final cleans the site to OWNER's satisfaction, (i) CONTRACTOR delivers to OWNER a Full and Final Release and Affidavit of Bills Paid in the form attached hereto as Attachment No 2, executed by i CONTRACTOR, (j) CONTRACTOR delivers to OWNER all other documentation required to be submitted to OWNER pursuant to the Contract Documents, including but not limited to any special guarantees or warranties, operation and maintenance manuals, etc' in each case in a form satisfactory to OWNER as determined in OWNER's sole discretion, and (k) the Final Application for Payment has been approved by the ENGINEER and OWNER. Acceptance of Final Payment by the CONTRACTOR shall constitute a waiver of all claims by CONTRACTOR against OWNER other than any claims previously made in writing by CONTRACTOR against OWNER, and still unsettled, and except for claims arising out of third party actions, cross-claims and counterclaims. No interest shall be due or payable by OWNER to CONTRACTOR on any sums retained or withheld by OWNER pursuant to the terms or provisions of the Contract Documents, except as otherwise provided by applicable law Neither the Certificate of Substantial Completion nor the Final Payment nor possession or acceptance of the Work shall relieve the CONTRACTOR of its obligation for correction of defective or non- conforming Work, or for fulfillment of any warranty, which may be required by law or by the Contract Documents. 6 10 CORRECTION OF WORK BEFORE FINAL PAYMENT The CONTRACTOR shall promptly remove from OWNER's premises all materials, equipment or Work which is defective or otherwise not in conformance with the Contract Documents, whether actually incorporated in the Work or not, and CONTRACTOR shall, at his own expense, promptly replace such materials, equipment or Work with other materials conforming to the requirements of the Contract. The CONTRACTOR shall also bear the expense of restoring all work of CONTRACTOR or other contractors damaged by any such removal or replacement. If CONTRACTOR does not remove and replace any such unsuitable Work within ten (10)business days after receipt of a written notice from the OWNER or the ENGINEER, the OWNER may remove,replace and remedy such work at CONTRACTOR's expense. 10-1012 00700-25 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 6 11 CORRECTION OF WORK AFTER FINAL PAYMENT If within one (1) year from the date of Substantial Completion or such longer period of time as may be prescribed by law or by the terms of any applicable special warranty required by the Contract Documents, any of the Work is found to be defective or not in accordance with the Contract Documents, CONTRACTOR shall, at its sole cost, correct it and any other work affected thereby promptly after receipt of a written notice from OWNER to do so In addition, CONTRACTOR shall be responsible for any damage to building contents, when such damage results from the CONTRACTOR's use of faulty matenals or defective workmanship; to the extent such damage is not covered by OWNER's insurance. This warranty penod shall renew and recommence for each corrected item of Work upon completion of the remedial work. This time period for correction by CONTRACTOR is in addition to, and not in lieu of, all warranties or remedies, which exist at common law or by statute. These warranty obligations shall survive the termination of this Contract, and shall be enforceable by a decree of specific performance, in addition to such other rights and remedies available to OWNER at law or in equity 6 12 PAYMENTS WITHHELD The OWNER may withhold, or on account of subsequently discovered evidence nullify and demand immediate repayment of, the whole or part of any certificate for payment or payment, to such extent as may be necessary to protect OWNER from loss on account of: (a) Defective or non-conforming Work not remedied, (b) Claims filed or reasonable evidence indicating probable filing of claims, (c) Failure of the CONTRACTOR to make payments promptly to subcontractors or for material or labor; (d) Damage to another contractor, OWNER, existing improvements on the site, or to adjacent or adjoining property; (e) Reasonable doubt that the Work can be completed for the unpaid balance of the Contract amount; (f) Reasonable indication that the Work will not be completed within the Contract Time; (g) Failure on the part of the CONTRACTOR to execute any and all documents, releases or other documents presented to the CONTRACTOR for execution, as provided for herein or otherwise; (h) Liquidated or other damages due to late completion, and/or (i) Any breach by CONTRACTOR of this Contract or any other agreement between OWNER and CONTRACTOR. When the above grounds are removed to OWNER's satisfaction,the withheld payment shall be made promptly If the said causes are not so remedied, OWNER may remedy the same for CONTRACTOR's account, charge the entire cost thereof to CONTRACTOR and deduct such cost 10-1012 00700-26 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT from the Contract Sum or from any payments due or to become due under any other agreement between OWNER and CONTRACTOR. 6.13 DELAYED PAYMENTS. Should the OWNER fail to make payment to the CONTRACTOR when payment is due in accordance with the terms of the Contract Documents, any interest due CONTRACTOR for late payments shall accrue and be paid in accordance with the provisions of Chapter 2251 of the Texas Government Code, as amended,and payment of such interest shall fully liquidate and compensate any injury to the CONTRACTOR growing out of such delay in payment. Should OWNER fail to pay CONTRACTOR an undisputed amount due within the time limits provided in the Contract or applicable law, CONTRACTOR shall give the notice required and comply with the provisions of Section 2251 051 of the Texas Government Code, and shall thereupon be entitled to the rights and remedies provided therein. 7.0 EXTRA WORK AND CLAIMS 7 01 DIFFERING SITE CONDITIONS During the progress of the work, if subsurface, latent physical conditions or unknown physical conditions of an unusual nature are encountered at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, the CONTRACTOR shall notify the OWNER's Representative in writing within three(3) calendar days of the specific differing conditions before the site is disturbed and before the affected work is.performed. (a)Upon written notification, the ENGINEER will investigate the conditions, and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding anticipated profits,will be made and the contract modified in writing accordingly The ENGINEER will notify the CONTRACTOR in writing of the determination whether or not an adjustment of the contract is warranted. (b)No contract adjustment which results in a benefit to the CONTRACTOR will be allowed unless the CONTRACTOR has provided the required written notice. (c)No contract adjustment will be allowed under this clause for any effects caused on unchanged work. 7 02 SUSPENSIONS OF WORK ORDERED BY THE ENGINEER. If the performance of all or any portion of the work is suspended by the ENGINEER in writing for seven(7) calendar days and the CONTRACTOR believes that additional compensation and/or contract time is due as a result of such suspension,the CONTRACTOR shall submit a written request for adjustment to the ENGINEER within seven(7) calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment. (a)Upon receipt, the ENGINEER will evaluate the CONTRACTOR's request. If the ENGINEER agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the CONTRACTOR, its suppliers, or subcontractors at any approved tier, and not caused by weather, the ENGINEER will make 10-1012 00700-27 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT an adjustment(excluding profit) and modify the contract in writing accordingly The CONTRACTOR will be notified of the ENGINEER's determination, in writing,whether or not an adjustment of the contract is warranted. (b)No contract adjustment will be allowed unless the CONTRACTOR has submitted the request for adjustment within the time prescribed. (c)No contract adjustment will be allowed under this clause to the extent that performance would have been suspended by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this contract. 7 03 CHANGE ORDERS. Without invalidating this Agreement, the OWNER may, at any time or from time to time, order additions, deletions or revisions to the Work; such changes will be authorized by Change Order to be prepared by the ENGINEER for execution by the OWNER and the CONTRACTOR. The Change Order shall set forth the basis for any change in Contract Price, as hereinafter set forth for Extra Work, and any change in Contract Time,which may result from the change. 7 04 In accordance with paragraph 1 07 CONTRACTOR'S request to work weekends, the Owner's Construction Manager shall, upon receipt of written notice by the CONTRACTOR of the need to conduct work on otherwise non-Work Days,prepare a cost estimate for providing Construction Management and Inspection services during the requested period and submit this to both OWNER and CONTRACTOR. If approved by both parties the Construction Manager shall prepare a Deductive Change Order in the amount stated in the estimate for the signature of the CONTRACTOR and the OWNER for inclusion in the next Pay Application. The Deductive Change Order must be signed and executed by both the OWNER and CONTRACTOR prior to start of work on any non-Work Day 7 05 MINOR CHANGES. The ENGINEER may authorize minor changes in the Work not inconsistent with the overall intent of the Contract Documents and not involving an increase in Contract Price or time. If the CONTRACTOR believes that any minor changes authorized by the ENGINEER involves Extra Work or entitles him to an increase in the Contract Price or the Contract Time, the CONTRACTOR shall give notice of same by written request to the ENGINEER for a written Work Order, with a copy to OWNER. Any such notice and request by the CONTRACTOR shall be given prior to beginning the changed work. CONTRACTOR's commencement of any minor change in the Work prior to such written notice and request shall constitute a waiver of any and all claims for an increase in the Contract Price or the Contract Time arising out of or related to such changed work. 7 06 EXTRA WORK. It is agreed that the CONTRACTOR shall perform all work when presented with a written Change Order, Work Change Directive or Work Order signed by the ENGINEER, subject, however, to the right of the CONTRACTOR to require written confirmation of such Change Order, Work Change Directive or Work Order by the OWNER. It is agreed that the basis of compensation or adjustment to the CONTRACTOR for work either altered, added or deleted by a Change Order or Work Change Directive, or for which a claim for - Extra Work is made, shall be determined by one or more of the following methods. Method(A) --By Contract unit prices applicable to the work, if any; or 10-1012 00700-28 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Method(B) --By agreed unit pnces or agreed stipulated lump sum price; or Method(C) --If neither Method (A) nor Method (B) can be agreed upon before the Extra Work is commenced, then the CONTRACTOR shall be paid the "Actual Field Cost" of the work plus. a) For subcontractors performing work mark-up shall be limited to fifteen percent, ten(10%)for the subcontractor plus five (5%) for the General Contractor or b)For the General Contractor alone, self-performing the extra work, without subcontractor, the mark-up shall not exceed ten percent (10%), as full and final compensation for the Extra Work and all costs and expenses, direct or indirect, arising out of or related thereto In the event said Extra Work or Change Order or Work Change Directive work is performed and paid for under Method (C), then the provisions of this paragraph shall apply and the "Actual Field Cost" is hereby defined as the cost to the CONTRACTOR of all workers, such as foremen, timekeepers, mechanics and laborers, and materials, supplies, trucks, rentals of machinery and equipment, for the time actually employed or used on such Extra Work or Change Order or Work Change Directive work, plus actual transportation charges necessarily incurred together with all power, fuel, lubricants, water and similar operating expenses, plus all necessary incidental expenses incurred directly on account of such Extra Work, including Social Security, Old Age Benefits and other payroll taxes, and a rateable proportion of premiums on Performance and Payment Bonds and Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation, and all other insurance as may be required by law or ordinance, or the Contract Documents,plus all payments to subcontractors for such work. The ENGINEER may direct the form in which accounts of the "Actual Field Cost" shall be kept and the records of these accounts shall be made available to the ENGINEER. The ENGINEER or OWNER may also specify in wnting, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used, otherwise these matters shall be determined by the CONTRACTOR. Unless .otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using one hundred percent (100%), unless otherwise specified, of the latest schedule of Equipment Ownership Expense adopted by the Associated General Contractors of America where practicable The mark-up of the "Actual Field Cost" to be paid to the CONTRACTOR, shall cover and compensate him for his profit, overhead, and all other elements of cost and expense not embraced within the "Actual Field Cost" as herein defined, save that where the CONTRACTOR's field office must be maintained solely on account of such Extra Work, then the cost to maintain and operate the same shall be included in the "Actual Field Cost." No claim for Extra Work of any kind will be allowed unless ordered by the ENGINEER in a written Work Order In case any orders or instructions, either oral or written, appear to the CONTRACTOR to involve Extra Work for which he should receive compensation or an adjustment in the Contract Time, he shall make written request to the ENGINEER for a written Work Order authorizing such Extra Work within ten (10) days of ENGINEER's orders or instructions, otherwise the orders or instructions will be considered minor changes. The issuance of a Work Order by the ENGINEER shall not constitute or be construed as an agreement or 10-1012 00700-29 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT acknowledgement by the ENGINEER that the work which is the subject of the Work Order is Extra Work outside the scope of the Contract Work, but shall merely constitute a direction to the CONTRACTOR to perform the work, and the CONTRACTOR shall proceed with the work, and shall keep an accurate account of the "Actual Field Cost" thereof, as provided under Method (C). Upon completion of the alleged Extra Work, the CONTRACTOR shall promptly and within ten (10) days submit his claim to the ENGINEER by proper certification and attestation, on forms provided by the ENGINEER. The ENGINEER shall render a written decision on CONTRACTOR's claim within ten (10) days. It is mutually agreed between the parties that the ENGINEER's decision on all claims or questions in relation to the Work, CONTRACTOR's performance of the Work, any changes in the Work or Extra Work, the Contract Price and/or the Contract Time, shall be final and conclusive and binding upon the parties. If the ENGINEER shall fail to respond in writing to CONTRACTOR's claim within thirty (30) days of the date of submission, or if CONTRACTOR shall dispute or object to ENGINEER's decision on any claim, and CONTRACTOR fails to file a Request for Mediation of such claim in accordance with the provisions of Article 9 0, within sixty(60) days after the date of submission to the ENGINEER, or such longer period as the parties may agree to in writing, the CONTRACTOR shall lose and forfeit his right to make such claim for Extra Work at any later date, and all such claims held by the CONTRACTOR shall be deemed waived, forfeited and forever barred. CONTRACTOR shall continue to diligently prosecute the Work notwithstanding any pending claim, dispute, or dispute resolution process between OWNER and CONTRACTOR. 7 07 TIME OF FILING CLAIMS. Except as otherwise provided herein, all questions of dispute or adjustment shall be made within the Pro-Trak system and filed with the ENGINEER within three (3) days after the ENGINEER has given any directions, order or instruction to which the CONTRACTOR desires to take exception. The ENGINEER shall reply within thirty(30) days to such written exceptions, and render his final decision in writing. It is mutually agreed between the parties that the ENGINEER's decision on all claims or questions in relation to the Work, CONTRACTOR's performance of the Work, any changes in the Work or Extra Work, the Contract Price and/or the Contract Time, shall be final and conclusive and binding upon the parties. In case the CONTRACTOR.should desire to appeal from the ENGINEER's decision, the CONTRACTOR may request a meeting between representatives of the OWNER and the CONTRACTOR for the purposes of appealing the ENGINEER's decision directly to the OWNER, such meeting to occur within ten (10) days after the date of the CONTRACTOR's request, or such longer period as may be agreed to by the parties in writing. If the CONTRACTOR shall still be aggrieved after a meeting with the OWNER and/or his representative, the CONTRACTOR shall have sixty (60) days after the date of the meeting, or such longer period as the parties may agree to in writing, to file a Request for Mediation of such claim in accordance with the provisions of Article 9 0 In the event the CONTRACTOR shall fail, for any reason,to timely file a Request for Mediation, the OWNER shall be released of any and all liability, and the CONTRACTOR's failure to timely file a Request for Mediation shall constitute a waiver, forfeit and final bar of all such claims held by the CONTRACTOR against the OWNER. CONTRACTOR shall continue to diligently prosecute the Work notwithstanding any pending claim, dispute, or dispute resolution process between OWNER and CONTRACTOR. 8.0 DEFAULT 8 01 DEFAULT BY CONTRACTOR. In case the CONTRACTOR should abandon and fail or refuse to resume Work within five (5) days after written notification from the OWNER 10-1012 00700-30 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT or the ENGINEER, or if the CONTRACTOR fails to comply with the orders of the ENGINEER when such orders are consistent with the Contract Documents, or if the CONTRACTOR otherwise defaults on its obligations under the Contract, OWNER shall have the right, if it so elects and without prejudice to any other rights it may have, after giving five (5) days written notice of default to CONTRACTOR and ariy surety, to terminate the Contract or any part thereof and/or to take over or cause others to take over the Work or any part thereof, and to complete such Work for the account of CONTRACTOR. Where Performance and Payment Bonds exist, the sureties on these bonds shall be directed to complete the Work in conjunction with the notice of default, and a copy of said notice shall be delivered to the CONTRACTOR. After receiving said notice of default,the CONTRACTOR shall promptly and within no more than three (3) days, remove from the Work any machinery, equipment, or tools then on the job,'not intended for incorporation into the Work. Should CONTRACTOR fail to promptly remove such machinery, equipment or tools, OWNER may remove such machinery, equipment or tools and store same at CONTRACTOR's expense, return such machinery, equipment or tools to their purported owner; or otherwise dispose of such machinery, equipment or tools as OWNER sees fit. Any materials, supplies and/or equipment delivered for use in the Work, may be used in the completion of the Work by the OWNER or the surety on the Performance Bond, or another contractor in completion of the Work; it being understood that the use of such equipment, supplies and materials will ultimately reduce the cost to complete the Work and be reflected in the fmal settlement. Where there is no Performance Bond or in case the surety should fail to commence compliance with the notice for completion hereinabove provided for within ten (10) days after the service of such notice, then the OWNER may provide for completion of the Work in either of the following elective manners. (a) The OWNER may thereupon employ such force of workers and use such machinery, equipment, tools, materials and supplies as the OWNER may deem necessary to expeditiously complete the Work, and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said CONTRACTOR, and expense so charged shall be deducted and paid by the OWNER out of such monies as may be due or that may thereafter at any time become due to the CONTRACTOR under and by virtue of this Agreement or any other agreement between OWNER and CONTRACTOR. In case such expense is less than the sum which would have been payable under this Contract if the same had been completed by the CONTRACTOR, then said CONTRACTOR shall be credited with the difference. In case such expense is greater than the sum which would have been payable under this Contract if the same had been completed by such CONTRACTOR, then the CONTRACTOR and/or his surety shall promptly pay the amount of such excess to the OWNER upon demand, or (b) The OWNER, under sealed bids, under the times and procedures provided for by law, may let the contract for completion of the Work under substantially the same terms and conditions which are provided in this Contract. In case of any increase m cost to the OWNER under the completion contract, as compared to what would have been the cost under this Contract, such increase shall be charged to the CONTRACTOR, and the amount of such increase may be deducted by the OWNER out of such monies as may be due or that may thereafter at any time 10-1012 00700-31 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT become due to the CONTRACTOR under and by virtue of this Agreement or any other agreement between OWNER and CONTRACTOR, or the CONTRACTOR and/or his surety shall promptly pay the amount of such increase to the OWNER upon demand. However, should the cost to complete any such completion contract prove to be less than what would have been the cost to complete under this Contract,the CONTRACTOR and/or his surety shall be credited therewith. In the event of a default by CONTRACTOR, no further payments shall be made to CONTRACTOR under the Contract until the Work is Finally Completed. When the Work shall have been Finally Completed, the CONTRACTOR and his surety shall be so notified. A complete itemized statement of the Contract accounts, certified by the ENGINEER as being correct, shall then be prepared and delivered to the CONTRACTOR and his surety, whereupon the CONTRACTOR and/or his surety shall pay the balance due as reflected by said statement. The OWNER, prior to incurring an obligation to make payment hereunder, shall have such statement of completion attested to by the CONTRACTOR and the surety as accurate, and in exchange for payment of the sum stated therein, the OWNER shall be entitled to a full and fmal release of any claims or demands by the CONTRACTOR or the surety In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the OWNER had the work been completed by the CONTRACTOR under the terms of this Contract, or when the CONTRACTOR and/or his surety shall pay the balance shown to be due by them to the OWNER, then all machinery, equipment, tools or supplies left on the site of the Work shall be turned over to the CONTRACTOR and/or his surety Should the cost to complete the Work exceed the Contract Price, and the CONTRACTOR and/or his surety fail to pay the amount due the OWNER within the time designated above, and there remains any machinery, equipment, tools, materials or supplies which are the property of CONTRACTOR on the site of the Work, notice thereof, together with an itemized list of such equipment and materials, shall be mailed to the CONTRACTOR and his surety at the respective addresses designated in the Contract, provided, however, that actual written notice given in any manner will satisfy this condition. After mailing or other giving of such notice, such property shall be held at the risk of the CONTRACTOR and his surety, subject only to the duty of the OWNER to exercise ordinary care to protect such property After fifteen (15) days from the date of such notice, the OWNER may sell such property, equipment, tools, materials or supplies, and apply the net sum derived from such sale to the credit of the CONTRACTOR and his surety Such sale may be made at either public or private sale, with or without notice, as the OWNER may elect. The OWNER shall release any machinery, equipment, tools, materials or supplies, which remain on the Work, and belong to persons other than the CONTRACTOR or his surety, to their reputed owners. 8 02 SUPPLEMENTATION OF CONTRACTOR FORCES If CONTRACTOR at any time shall, in OWNER'S sole opinion, fail to furnish skilled workers, suitable materials, supplies or adequate equipment sufficient for the prompt, timely and diligent prosecution of the Work in accordance with OWNER's direction, OWNER shall have the nght, without prejudice to the exercise of other remedies for the same default and without fully taking over the Work, to supplement CONTRACTOR's forces and to expedite delivery of and to procure and furnish such workers, materials, tools, supplies or equipment for CONTRACTOR's account by employing other contractors and suppliers engaged in the same class of work and charge the entire cost thereof to CONTRACTOR, said cost to be deducted from sums due or to become due to 10-1012 00700-32 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT CONTRACTOR under the Contract or any other agreement with OWNER or any parent, subsidiary or affiliate of OWNER. 8.03 CUMULATIVE REMEDIES & SPECIFIC PERFORMANCE. All rights and remedies of OWNER, under the terms of the Contract and/or available at law or in equity, are cumulative. In the event CONTRACTOR or any of its subcontractors, vendors or suppliers fails or refuses for any reason to provide timely manufacture, fabrication, delivery, installation, erection, construction or completion of any supplies, materials, expendables, equipment, machinery, accessories or appurtenances to be furnished hereunder, CONTRACTOR acknowledges and agrees that such items are required, necessary, essentially unique to the Project and the Work and will cause irreparable harm to OWNER and the Project if not furnished in accordance with the Contract, and OWNER shall have the right to obtain a decree of specific performance and mandatory injunctive relief from any Court of competent jurisdiction to ensure the timely furnishing of such items. 8.04 CROSS-DEFAULT If, for any reason, CONTRACTOR is declared in default and/or terminated by OWNER under any other agreement with OWNER, whether related to the Project or not related to the Project, OWNER shall have the right to offset and apply any amount's which might be owed to OWNER by CONTRACTOR under any other such agreements against any earned but unpaid amounts owing to CONTRACTOR by OWNER under the Contract, any retainage earned by CONTRACTOR under the Contract or any unearned, unpaid amount under the Contract. 8 05 INSOLVENCY It is recognized that if CONTRACTOR becomes a debtor in voluntary or involuntary bankruptcy proceedings, makes a general assignment for the benefit of creditors, or if a receiver is appointed on account of his insolvency, such events could seriously impair or frustrate CONTRACTOR's performance of the Work. Accordingly, it is agreed that should CONTRACTOR become a debtor in bankruptcy, either voluntary or involuntary, CONTRACTOR shall notify OWNER in writing within twenty-four (24) hours of the filing with the bankruptcy court. Further, it is agreed that upon occurrence of any one or more such events, OWNER shall be entitled to request of CONTRACTOR or its successors, trustees or receivers, adequate assurances of future performance In the event such adequate assurances are not given to the reasonable satisfaction of OWNER within seventy-two (72) hours of such request, OWNER shall have the right to immediately invoke the remedies of this Section 8 or as provided by law Pending receipt of such adequate assurances of such future performance, OWNER may proceed with the Work on a temporary basis and deduct the costs, plus reasonable overhead and profit, from any amounts due or which may become due to CONTRACTOR under the Contract or any other agreement with OWNER. In this regard, OWNER and CONTRACTOR agree that delays in performance could result in more damages to CONTRACTOR than would be sustained if OWNER failed to exercise such remedies. 8 06 CONTINGENT ASSIGNMENT CONTRACTOR hereby assigns to OWNER, all of CONTRACTOR's rights under and interest in any and all subcontracts and/or purchase orders entered into by CONTRACTOR pursuant to this Agreement, such assignment to become effective upon CONTRACTOR's default under this Agreement or OWNER's termination of this Contract, and OWNER's acceptance of such assignment. Upon CONTRACTOR's default or OWNER's termination of this Contract, OWNER may, in the event there is no performance bond for the Contract, or in the event the performance bond surety fails to complete the Contract, or if OWNER otherwise so elects in its sole discretion, accept such assignment by written notice of such 10-1012 00700-33 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT acceptance to CONTRACTOR and subcontractor, and may require subcontractors to perform all of the then unperformed duties and obligations under the subcontract, for the direct benefit of OWNER. In the event OWNER requires such performance by a subcontractor, then OWNER shall be obligated to pay such subcontractor any amounts due and owing under the terms of the subcontract/purchase order, at the subcontract prices and rates, and subject to any rights of withholding or offset and other terms and conditions of the subcontract, for all work properly performed by such subcontractor, to the date of OWNER's acceptance and thereafter OWNER's liability in this connection, however, shall not exceed the amount obtained by subtracting all payments made by CONTRACTOR to subcontractor from the Subcontract Price at the time of CONTRACTOR's default or OWNER's termination of CONTRACTOR. CONTRACTOR shall include a provision in its subcontracts that allows such assignment and allows OWNER to take these actions, and further provides that in the event of CONTRACTOR's termination for default, the subcontractor agrees to give the OWNER or its agent the right to mspect all books and records of subcontractor relating to the Work. 8 07 WAIVER OF CONSEQUENTIAL DAMAGES. CONTRACTOR expressly waives any and all claims for consequential damages against OWNER arising out of or related to this Contract, or any other agreements between CONTRACTOR and OWNER, including, but not limited to, claims for damages incurred by CONTRACTOR for principal office expenses, including the compensation of personnel stationed there, losses of financing, bonding capacity, business and reputation, and claims for lost profit, whether on this Contract or otherwise. 8 08 TERMINATION FOR CONVENIENCE. OWNER may at its sole discretion, upon five (5) days written notice to CONTRACTOR, terminate this Contract, in whole or in part, if and when OWNER determines that it is in the best interest of OWNER to do so Upon receipt of such written notice from OWNER, CONTRACTOR shall cease all terminated Work and take reasonable precautions to protect and preserve such work, and shall take all reasonable measures after consultation with OWNER to terminate or assign to OWNER all subcontracts, purchase orders or other commitments related to the Work or the Project on terms and conditions acceptable to OWNER. CONTRACTOR will be paid for all Work performed in strict accordance with'the Contract Documents, based upon the Contract Price and the percentage of completion on the date of termination, and less amounts previously paid, subject to any reasonable backcharges attributable to CONTRACTOR's failure to comply with any of the provisions of this Contract and further subject to the other terms of this Contract regarding payment. In no event will CONTRACTOR receive or be entitled to any payment or compensation whatsoever for interruption of business or loss of business opportunities, any other items of consequential damages, for overhead or loss of profits on the unperformed Work and/or services and unfurnished materials or for any intangible, impact or similarly described cost, damages or expense, and under no circumstances shall the total sum paid to or received by CONTRACTOR under this Contract exceed the Contract Price. The compensation provided herein shall be CONTRACTOR's sole and exclusive remedy arising out of a termination for convenience. 8 09 DEFAULT BY OWNER. In case the OWNER shall default on its material obligations under this Contract, other than OWNER's failure to pay CONTRACTOR a disputed amount due within the time limits provided in the Contract or applicable law, as addressed by Section 6 13 of this Agreement, and shall fail or refuse to cure; or to commence and diligently pursue cure of such default within fifteen (15) days after written notification by the CONTRACTOR, then the CONTRACTOR may suspend or wholly abandon the Work, and may remove therefrom all machinery, tools and equipment, and all materials on the site of the Work 10-1012 00700-34 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT that have not been included in payments to the CONTRACTOR and have not been mcorporated into the Work. And thereupon, the ENGINEER shall make an estimate of the total amount earned by the CONTRACTOR, which estimate shall include the value of all Work actually completed by said CONTRACTOR (at the Contract Prices), the value of all partially completed Work at a fair and equitable price, and the amount of all Extra Work performed at the prices agreed upon, or provided for by the terms of this Contract, and a reasonable sum to cover the cost of any provisions made by the CONTRACTOR to carry the whole Work to completion and which cannot be utilized. The ENGINEER shall then make a final statement of the balance due the CONTRACTOR by deducting from the above estimate all previous payments by the OWNER and all other sums that may be retained by the OWNER under the terms of this Agreement, and shall present the same to the OWNER, and OWNER's payment of said sum to the CONTRACTOR, on or before thirty (30) days after OWNER's receipt of such statement, shall satisfy any and all rights, claims or causes of action of CONTRACTOR arising out of or related to such default by OWNER, and shall be CONTRACTOR's sole and exclusive remedy for such default. A disputed or unilateral claim by the Contractor cannot by itself constitute a default hereunder 9.0 DISPUTE RESOLUTION Any dispute or pending claim or dispute resolution process between OWNER and CONTRACTOR shall not excuse or relieve CONTRACTOR of its obligations under the Contract, and CONTRACTOR shall diligently prosecute the Work notwithstanding any pending claim, dispute, or dispute resolution process between OWNER and CONTRACTOR. All claims, disputes and other matters in question arising out of or relating to,the Contract, or the breach thereof, shall be subject to mediation as a condition precedent to any other dispute resolution process as may be selected by OWNER. Unless mutually agreed otherwise the mediation shall be conducted by a third party who will be selected by agreement between OWNER and CONTRACTOR, and Request for Mediation shall be filed with the other party The parties shall share the mediator's fee and any filing fees equally If a claim, dispute or other matter in question between OWNER and CONTRACTOR involves the work of a subcontractor or supplier, OWNER or CONTRACTOR may join such subcontractor or supplier as a party to any mediation proceeding between OWNER and CONTRACTOR hereunder CONTRACTOR shall include in all subcontracts and/or purchase orders related to the Work a specific provision whereby the subcontractor or supplier consents to being joined in mediation between OWNER and CONTRACTOR involving the work of such subcontractor or supplier This Contract shall be governed by the laws of the State of Texas and shall be considered performable in Brazoria County, Texas, for venue purposes. Further, the OWNER and CONTRACTOR stipulate that venue for any dispute resolution proceeding involving or touching upon the Contract other than the conduct of an arbitration hearing shall be in Brazoria County, Texas, or, if such choice of venue is prohibited or unenforceable by law, shall be held in the county where the Project is located. CONTRACTOR agrees to pay OWNER all reasonable attorneys' fees incurred by OWNER m the event OWNER seeks to enforce any provision of this Contract whether by arbitration or other dispute resolution process. Further, in the event OWNER defends any claim instituted by CONTRACTOR against OWNER, whether in arbitration or other dispute resolution 10-1012 00700-35 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT process, CONTRACTOR agrees to pay OWNER all reasonable attorneys' fees incurred by OWNER in defending such claim provided OWNER is the prevailing party, in whole or in part, in such proceeding. 10-1012 00700-36 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ATTACHMENT NO. 1 TO GENERAL CONDITIONS WORKERS' COMPENSATION INSURANCE COVERAGE A. DEFINITIONS Certificate of coverage ("certificate") A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC81, TWCC-82, TWCC-83 or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project for the duration of the Project. Duration of the Project includes the time from the beginning of the Work on the Project until the contractor's/person's work on the Project has been completed and the Project warranty period has expired. Persons providing services on the project includes persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with due contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, motor carriers and owner- operators, (as defined at Section 406.121 of the Texas Labor Code), leasing companies, and employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B The CONTRACTOR shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Title 5 Workers' Compensation, Subtitle A Texas Workers' Compensation Act, for employees of the contractor providing services on the project, for the duration of the project. C The CONTRACTOR must provide a certificate of coverage to the OWNER prior to being awarded the Contract. D. If the coverage penod shown on the CONTRACTOR's current certificate of coverage ends during the duration of the project, the CONTRACTOR must, prior to the end of the coverage penod, file a new certificate of coverage with the OWNER showing that coverage has been extended. E. The CONTRACTOR shall obtain from each subcontractor or other person providing services on a project, and provide to the OWNER. (I) a certificate of coverage, prior to that person beginning work on the Project, so the OWNER will have on file certificates of coverage showing coverage for all persons providing services on the Project; and 05/2007 00700-Al CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (2) no later than seven days after receipt by the CONTRACTOR and prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. F The CONTRACTOR shall retain all required certificates of coverage for the duration of the Project and for one year thereafter G. The CONTRACTOR shall notify the OWNER in writing by certified mail or personal delivery, within 10 days after the CONTRACTOR knew or should have known, of any changes that materially affect the provision of coverage of any person providing services on the Project. H. The CONTRACTOR shall post on each Project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. NOTICE REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at (512) 440- 3789 to receive information on the legal requirements for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." The CONTRACTOR shall contractually require each person with whom it contracts to provide services on a project, too (1) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Title 5 Workers' Compensation, Subtitle A Texas Workers' Compensation Act, for all of its employees providing services on the Project, for the duration of the Project; (2) provide to the CONTRACTOR,prior to that person beginning work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the Project: 05/2007 00700-A2 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (3) provide the CONTRACTOR,pnor to the end of the coverage period, a new certificate of coverage, showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; (4) obtain from each other person with whom it contracts, and provide to the CONTRACTOR. (a) a certificate of coverage,prior to the other person beginning work on the Project; and (b) a new certificate of coverage showing extension of coverage,prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends dunng the duration of the Project; (5) retain all required certificates of coverage on file for the duration of the Project and for one year thereafter; (6) notify the OWNER in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project; and (7) contractually require each person with whom it contracts,to perform as required by paragraphs (1) - (7),with the certificates of coverage to be provided to the person for whom they are providing services. J By signing this Contract or providing or causing to be provided a certificate of coverage, the CONTRACTOR is representing to the OWNER that all employees of the CONTRACTOR who will provide services on the Project will be covered by workers' compensation coverage for the duration of the Project, that the coverage agreements will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance earner or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the CONTRACTOR to administrative penalties, criminal penalties, civil penalties, or other civil actions. K. The CONTRACTOR's failure to comply with any of these provisions is a breach of contract by the CONTRACTOR, which entitles the OWNER to pursue all rights and remedies available to it under the Contract, at law or in equity, if the CONTRACTOR does not remedy the breach within ten days after receipt of notice of breach from the OWNER. 05/2007 00700-A3 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ATTACHMENT NO. 2 TO GENERAL CONDITIONS AGREEMENT FOR FINAL PAYMENT AND CONTRACTOR'S SWORN RELEASE In consideration of the Final Payment under that certain contract between [Contractor's Company Name] (hereafter "CONTRACTOR") and the City of Pearland (hereafter "OWNER") for the Project known as Liberty and Suburban Garden Ground Storage Tank Rehabilitation Project (the "Contract"), the CONTRACTOR makes the following representations to OWNER, either individually if a proprietorship, or jointly and severally by all general partners if a partnership, or if a corporation, by action of the president and secretary of said corporation, as duly authorized by appropriate action of the stockholders and/or board of directors of said corporation, their signatures hereon constituting a representation under oath by said individuals that they have the authority to execute this Agreement for and on behalf of the said corporation. 1 The undersigned CONTRACTOR represents to OWNER that the Application for Payment for the Final Payment under the Contract, and the final Change Order issued under the Contract if any, whether or not modified, corrected or changed in some way by the ENGINEER, the CONTRACTOR or the OWNER, a copy of which are attached hereto and marked Exhibit "A", are true, correct and accurate, and that CONTRACTOR has received payment in full for all other Applications for Payment submitted under the Contract, and that CONTRACTOR has been fully compensated for all labor, materials, equipment and/or services furnished in connection with the Contract, except for the Final Payment. 2. It is agreed and stipulated by the undersigned CONTRACTOR that upon the receipt of Final Payment in the amount as set out on the attached Application for Payment, the CONTRACTOR, by execution of this instrument of release, does, therefore, RELEASE and FOREVER DISCHARGE OWNER of and from all manner of debts, claims, demands, obligations, suits, liabilities and causes of action of any nature whatsoever, at law or in equity, in contract or in tort, now existing or which may hereafter accrue, arising out of or related to the Contract, any Change Orders or Work Orders, the Work, or any labor, materials, equipment or services furnished by CONTRACTOR to OWNER. 3 The CONTRACTOR, acting by and through the person or persons whose names are subscribed hereto, does solemnly swear and affirm that all bills and claims have been paid to all matenalmen, suppliers, laborers, subcontractors, or other entities performing services or. supplying materials or equipment, and that OWNER shall not be subject to any bills, claims, demands, litigation or suits in connection therewith. 4 It is further specifically understood and agreed that this Agreement for Final Payment and Contractor's Sworn Release shall constitute a part of the Contract, and it is also specifically understood and agreed that this Agreement shall not act as a modification,waiver or renunciation by OWNER of any of its rights or remedies as set out in the Contract itself, but this Agreement for Final Payment and Contractor's Sworn Release shall constitute a supplement thereto for the additional protection of OWNER. 05/2007 00700-B1 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT SIGNED and EXECUTED this, the_day of , 20_ CONTRACTOR. By. Signature Print Name: Title: [If CONTRACTOR is a proprietorship, owner must sign, if a partnership, each general partner must sign, if a corporation,the following language should be used.] SIGNED and EXECUTED this,the day of 20_by , a Texas corporation,under authority granted to the undersigned by said corporation as contained in the Charter, By-Laws or Minutes of _ a meeting of said corporation regularly called and held. CONTRACTOR. By. President ATTEST Corporate Secretary (Corporate Seal) [This form is for use by either a propnetorship or a partnership In the event CONTRACTOR is a partnership or a joint proprietorship, additional signature lines should be added for each individual.] 05/2007 00700-B2 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT AFFIDAVIT STATE OF TEXAS § COUNTY OF § BEFORE ME, the undersigned authority, on this day personally appeared the person or persons whose name(s) are subscribed to the above and foregoing Agreement for Final Payment and Contractor's Sworn Release,who each, after being by me duly sworn, on their oaths deposed and said. I (We) am(are)the person(s)who signed and executed the above and foregoing Agreement for Final Payment and Contractor's Sworn Release, and I(we)have read the facts and statements as therein set out and the representations as made therein, and I(we) state that the above and foregoing are true and correct. CONTRACTOR-Affiant SWORN TO AND SUBSCRIBED TO before me,the day of 20_ Notary Public, State of Texas My Commission Expires. [This form is for use in the event CONTRACTOR is a corporation.] 07/2006 00700-B3 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT AFFIDAVIT STATE OF TEXAS § COUNTY OF § BEFORE ME,the undersigned authority, on this day personally appeared the persons who signed and executed the above and foregoing Agreement for Final Payment mid Contractor's Sworn Release,whose names are set out above,who each, after being by me duly sworn, on their oaths deposed and said. We each are the persons whose names are subscribed above, and hold respectively the offices in the corporation as set out above, and each state under oath that we have the authority to execute this Agreement for Final Payment and Contractor's Sworn Release for and on behalf of said corporation,pursuant to authority granted to us in the Charter of said corporation, the By-Laws of said corporation and/or the Minutes of said corporation, and the facts, statements and representations as set out in the instrument to which this Affidavit is attached, are true and correct. SWORN TO AND SUBSCRIBED TO before me this,the day of 20 Notary Public, State of Texas My Commission Expires. 07/2006 00700-B4 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ATTACHMENT NO. 3 TO GENERAL CONDITIONS OWNER'S INSURANCE REQUIREMENTS OF CONTRACTOR 1 Definitions. For purposes of this Agreement: 1 1 Owner Parties. "Owner Parties" means (a) the City of Pearland, its successors and assigns, and the Engineer, (b) any officers, employees, or agents of such persons or entities, and(c) others as required by the Contract Documents, if any 1.2 Contractor "Contractor" shall mean the vendor providing the service or work to be performed under this Agreement. 1.3 Subcontractor "Subcontractor" shall include subcontractors of any tier 14 ISO "ISO"means Insurance Services Office. 2. Contractor Insurance Representations to Owner Parties 2.1 It is expressly understood and agreed that the insurance coverages required herein. 2.1 1 represent Owner Parties' minimum requirements and are not to be construed to void or limit the Contractor's indemnity obligations as contained in this Agreement nor represent in any manner a determination of the insurance coverages the Contractor should or should not maintain for its own protection, and 2.1.2 are being, or have been, obtained by the Contractor in support of the Contractor's liability and indemnity obligations under this Agreement. Neither the requirements as to insurance to be earned as provided for herein, the insolvency, bankruptcy or failure of any insurance company carrying insurance of the Contractor, nor the failure of any insurance company to pay claims accruing, shall be held to affect,negate or waive any of the provisions of this Agreement. 2.2 Failure to obtain and maintain the required insurance shall constitute a matenal breach of, and default under, this Agreement. If the Contractor shall fail to remedy such breach within five (5) business days after notice by the Owner, the Contractor will be liable for any and all costs, liabilities, damages and penalties resulting to the Owner Parties from such breach, unless a wntten waiver of the specific insurance requirement(s) is provided to the Contractor by the Owner In the event of any failure by the Contractor to comply with the provisions of this Agreement, the Owner may, without in any way compromising or waiving any right or remedy at law or in equity, on notice to the Contractor, purchase such insurance, at the Contractor's expense, provided that the Owner shall have no obligation to do so and if the Owner shall do so, the Contractor shall not be relieved of or excused from the obligation to obtain and maintain such insurance amounts and coverages. 10-2012 00700-Cl CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 3 Conditions Affecting All Insurance Required Herein 3 1 Cost of Insurance. All insurance coverage shall be provided at the Contractor's sole expense. 3.2 Status and Rating of Insurance Company All insurance coverage shall be written through insurance companies authorized to do business in the state in which the work is to be performed and rated no less than A- VII in the most current edition of A. M. Best's Key Rating Guide. 3.3 Restrictive, Limiting, or Exclusionary Endorsements. All insurance coverage shall be provided to the Owner Parties in compliance with the requirements herein and shall contain no endorsements that restrict, limit, or exclude coverage required herein in any manner without the prior express written approval of the Owner 3 4 Limits of Liability The limits of liability may be provided by a single policy of insurance or by a combination of primary and umbrella policies, but in no event shall the total limits of liability available for any one occurrence or accident be less than the amount required herein. 3.5 Notice of Cancellation, Nonrenewal, or Material Reduction in Coverage. All insurance coverage shall contain the following express provision. In the event of cancellation, non-renewal, or material reduction in coverage affecting the certificate holder, thirty (30) days prior written notice shall be given to the certificate holder by certified mail or registered mail,return receipt requested. 3 6 Waiver of Subrogation. The Contractor hereby agrees to waive its rights of recovery from the Owner Parties with regard to all causes of property and/or liability loss and shall cause a waiver of subrogation endorsement to be provided in favor of the Owner Parties on all insurance coverage carried by the Contractor, whether required herein or not. 3 7 Deductible/Retention. Except as otherwise specified herein, no insurance required herein shall contain a deductible or self-insured retention in excess of $25,000 without pnor written approval of the Owner All deductibles and/or retentions shall be paid by, assumed by, for the account of, and at the Contractor's sole risk. The Contractor shall not be reimbursed for same. 4 Maintenance of Insurance. The following insurance shall be maintained in effect with limits not less than those set forth below at all times dunng the term of this Agreement and thereafter'as required. 10-2012 00700-C2 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4 1 Commercial General Liability Insurance 4 1 1 Coverage. Such insurance shall cover liability arising out of all locations and operations of the Contractor, including but not limited to liability assumed under this contract (including the tort liability of another assumed in a business contract). Defense shall be provided as an additional benefit and not included within the limit of liability 4 1.2 Form. Commercial General Liability Occurrence form (at least as broad as an unmodified ISO CG 0001 0798 or its equivalent). 4 1.3 Amount of Insurance. Coverage shall be provided with limits of not less than. Each Occurrence Limit $1,000,000 General Aggregate Limit $2,000,000 Product-Completed Operations Aggregate Limit $2,000,000 Personal and Advertising Injury Limit $1,000,000 4 1 4 Required Endorsements a. Additional Insured. Additional insured status shall be provided in favor of the Owner Parties on any of the following: i. ISO form CG 20 10 11 85, or ii. ISO form CG 20 26 11 85, or iii. a combination of ISO forms CG 20 33 10 01 and CG 20 37 10 01, or iv any form providing equivalent protection to Owner b Designated Construction Project(s) Aggregate Limit. The aggregate limit shall apply separately to this Agreement through use of an ISO CG 25 03 03 97 endorsement or its equivalent. c. Notice of Cancellation, Nonrenewal or Material Reduction in Coverage, as required in 3.5, above. d. Personal Injury Liability The personal injury contractual liability exclusion shall be deleted. e. Pnmary and Non-Contributing Liability It is the intent of the parties to this Agreement that all insurance required herein shall be primary to all insurance available to the Owner Parties. The obligations of the Contractor's insurance shall not be affected by any other insurance available to-the Owner Parties and shall seek no contribution from the Owner Parties' insurance, whether primary, excess contingent, or on any other basis. The Contractor's insurance coverage shall be endorsed to provide such primary and non- contributing liability f. Waiver of Subrogation, as required m 3 6, above. 10-2012 00700-C3 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4 1.5 Continuing Commercial General Liability Insurance. The Contractor shall maintain such insurance in identical coverage, form and amount, including required endorsements, for at least one (1) year following Date of Substantial Completion of the Work to be performed under this Agreement. The Contractor shall provide written representation to Owner stating Work completion date. 4.2 Auto Liability Insurance 4.2.1 Coverage. Such insurance shall cover liability arising out of any auto (including owned,hired, and non-owned). 4.2.2 Form. Business Auto form (at least as broad as an unmodified ISO CA 0001 or its equivalent). 4.2.3 Amount of Insurance. Coverage shall be provided with a limit of not less than$1,000,000 4.2.4 Required Endorsements a. Notice of Cancellation, Nonrenewal or Material Reduction in Coverage, as required in 3.5, above. b Waiver of Subrogation, as required in 3 6, above. 4.3 Employer's Liability Insurance 4.3 1 Coverage. Employer's Liability Insurance shall be provided as follows. 4.3.2 Amount of Insurance. Coverage shall be provided with a limit of not less than. Employer's Liability $1,000,000 each accident and each disease. 4.3.3 Required Endorsements a. Notice of Cancellation, Nonrenewal or Material Reduction in Coverage, as required in 3.5, above. b Waiver of Subrogation, as required in 3 6, above. 4 4 Umbrella Liability Insurance 4 4 1 Coverage. Such insurance shall be excess over and be no less broad than all coverages described above and shall include a drop-down provision for exhaustion of underlying limits. 4 4.2 Form. This policy shall have the same inception and expiration dates as the commercial general liability insurance required above. 10-2012 00700-C4 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4 4.3 Amount of Insurance. Coverage shall be provided with a limit of not less than$5,000,000 4 4 4 Continuing Umbrella Liability Insurance. The Contractor shall maintain such insurance in identical coverage, form and amount, including required endorsements, for at least one (1) year following Date of Substantial Completion of the Work to be performed under this Agreement. The Contractor shall provide written representation to the Owner stating Work completion date. 4.5 Professional Liability Insurance 4.5 1 Coverage. The Contractor shall provide professional liability insurance for any professional design or engineering drawing required by the work. Such insurance shall indemnify the Owner from claims arising from the negligent performance of professional services of any type, including but not limited to design or design/build services as part of the Work to be performed. 4.5.2 Form. This insurance shall include pnor acts coverage sufficient to cover all services rendered by the Contractor and by its consultants under this Agreement. It is recognized that this coverage may be provided on a Claims-Made basis. 4.5.3 Amount of Insurance. Coverage shall be provided with a limit of not less than$1,000,000 4.5 4 Continuing Professional Liability Insurance. The Contractor shall mamtain such insurance in identical coverage, form and amount for at least one (1) year following Date of Substantial Completion of the Work to be performed under this Agreement. The Contractor shall provide written representation to the,Owner stating Work completion date. 4 6 Builder's Risk 4 6.1 Insureds. Insureds shall include: a. Owner, General Contactor and all Loss Payees and Mortgagees as Named Insureds, and b subcontractors of all tiers in the Work as Additional Insureds. 10-2012 00700-C5 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4 6.2 Covered Property. Such insurance shall cover• a. all structure(s) under construction, including retaining walls, paved surfaces and roadways, bridges, glass, foundation(s), footings, underground pipes and wiring, excavations, grading, backfilling or filling; b all temporary structures (e.g., fencing, scaffolding, cribbing, false work, forms, site lighting, temporary utilities and buildings) located at the site; c all property including matenals and supplies on site for installation, d. all property including materials and supplies at other locations but intended for use at the site; e. all property including matenals and supplies in transit to the site for installation by all means of transportation other than ocean transit; and f. other Work at the site identified in the Agreement to which this Exhibit is attached. Form a. Coverage shall be at least as broad as an unmodified ISO Special form, shall be provided on a completed-value basis, and shall be pnmary to any other coverage insurance available to the insured parties, with that other insurance being excess, secondary and non- contributing. b No protective safeguard warranty shall be permitted. c. Required coverage shall further include. i. Additional expenses due to delay in $ TBD completion of project(where applicable) ii. Agreed value Included without sublimit in. Damage arising from error, omission or Included without sublimit deficiency in construction methods, design, specifications,workmanship or materials, including collapse iv Debns removal additional limit 25% of direct damage loss v Earthquake(where applicable) $ TBD vi. Earthquake sprinkler leakage (where $ TBD applicable) vii. Expediting expenses $ TBD viii. Flood(where applicable) $ TBD ix. Freezing Included without sublimit x. Mechanical breakdown, including hot& Included without subhmit cold testing(where applicable) xi. Notice of cancellation,non-renewal or Included 10-2012 00700-C6 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT material reduction—60 days prior written notice to each insured xii. Occupancy clause, as required in F, Included below xiii. Ordinance or law Included without sublimit xiv Pollutant clean-up and removal $ TBD xv Preservation of property Included without sublimit xvi. Replacement cost Included xvii. Theft Included without sublimit xviii. Waiver of subrogation as required in G, Included below 4 6.3 Amount of Insurance. Coverage shall be provided in an amount equal at all times to the full replacement value and cost of debris removal for any single occurrence. 4 6 4 Deductibles. Deductibles shall not exceed the following: a. All Risks of Direct Damage,Per $5,000 Occurrence, except b Delayed Opening Waiting Period 5 Days c. Flood, Per Occurrence $25,000 or excess of NFIP if in Flood Zone A, B or V d. Earthquake and Earthquake Sprinkler $25,000 Leakage, Per Occurrence 4 6.5 Termination of Coverage. The termination of coverage provision shall be endorsed to permit occupancy of the covered property being constructed so long as such occupancy does not exceed 20% of the usable area of the property This insurance shall be maintained in effect, unless otherwise provided for in the Contract Documents, until the earliest of the following dates. a. the date on which all persons and organizations who are insureds under the policy agree that it shall be terminated, b the date on which final payment, as provided for in the Agreement to which this Exhibit is attached,has been made; or c the date on which the insurable interests in the Covered Property of all insureds other than Contractor have ceased. 10-2012 00700-C7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4 6 6 Waiver of Subrogation. The waiver of subrogation provision shall be endorsed as follows. a. A waiver of subrogation shall be provided in favor of all insureds. b The waiver of subrogation provisions shall be endorsed as follows. Should a covered loss be subrogated, either in whole or in part, your rights to any recovery will come first, and we will be entitled to a recovery only after you have been fully compensated for the loss. 5 Intentionally left blank. 6 Evidence of Insurance 6 1 Provision of Evidence. Evidence of the insurance coverage required to be maintained by the Contractor, represented by certificates of insurance, evidence of insurance, and endorsements issued by the insurance company or its legal agent, and must be furnished to the Owner pnor to commencement of Work and not later than fifteen (15) days after receipt of this Agreement. New certificates of insurance, evidence of insurance, and endorsements shall be provided to the Owner prior to the termination date of the current certificates of insurance, evidence of insurance, and endorsements. 6.2 Form 6.2.1 All property insurance required herein shall be evidenced by ACORD form 28, "Evidence of Property Insurance" 6.2.2 All liability insurance required herein shall be evidenced by ACORD form 25, "Certificate of Insurance" 6.3 Specifications. Such certificates of insurance, evidence of insurance, and endorsements shall specify 6.3 1 The Owner as a certificate holder with correct mailing address. 6.3.2 Insured's name,which must match that on this Agreement. 6.3.3 Insurance companies affording each coverage, policy number of each coverage, policy dates of each coverage, all coverages and limits described herein, and signature of authorized representative of insurance company 6.3 4 Producer of the certificate with correct address and phone number listed. 6.3.5 Additional insured status required herein. 6.3 6 Amount of any deductibles and/or retentions. 6.3 7 Cancellation, non-renewal and material reduction in coverage notification as required by this Agreement. Additionally, the words "endeavor to" and "but failure to mail such notice shall impose no obligation or liability of any , kind upon Company, it agents or representatives" shall be deleted from the cancellation provision of the ACORD 25 certificate of insurance form. 10-2012 00700-C8 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 6.3 8 Designated Construction Project Aggregate Limits required herein. 6.3.9 Personal Injury contractual liability required herein. 6.3 10 Primary and non-contributing status required herein. 6.3 11 Waivers of subrogation required herein. 6 4 Required Endorsements. A copy of each of the required endorsements shall also be provided. 6.5 Failure to Obtain. Failure of any Owner Party to demand such certificate or other evidence of full compliance with these insurance requirements or failure of any Owner Party to identify a deficiency from evidence that is provided shall not be construed as a waiver of the Contractor's obligation to maintain such insurance. 6 6 Certified Copies. Upon request of any Owner Party, the Contractor shall provide to the Owner a certified copy of all insurance policies required herein within ten (10) days of any such request. Renewal policies, if necessary, shall be delivered to the Owner prior to the expiration of the previous policy 6 7 Commencement of Work. Commencement of Work without provision of the required certificate of insurance, evidence of insurance and/or required endorsements, or without compliance with any other provision of this Agreement, shall not constitute a waiver by any Owner Party of any rights. The Owner shall have the right, but not the obligation, of prohibiting the Contractor or any subcontractor from performing any Work until such certificate of insurance, evidence of insurance and/or required endorsements are received and approved by the Owner 7 Insurance Requirements of Contractor's Subcontractors 7 1 Insurance similar to that required of the Contractor shall be provided by all subcontractors (or provided by the Contractor on behalf of subcontractors) to cover operations performed under any subcontract agreement. The Contractor shall be held responsible for any modification in these insurance requirements as they apply to subcontractors. The Contractor shall maintain certificates of insurance from all subcontractors containing provisions similar to those listed herein (modified to recogmze that the certificate is from subcontractor) enumerating, among other things, the waivers of subrogation, additional insured status, and pnmary liability as required herein, and make them available to the Owner upon request. 7.2 The Contractor is fully responsible for loss and damage to its property on the site, including tools and equipment, and shall take necessary precautions to prevent damage to or vandalism, theft, burglary, pilferage and unexplained disappearance of property Any insurance covenng the Contractor's or its subcontractor's property shall be the Contractor's and its subcontractor's sole and complete means or recovery for any such loss. To the extent any loss is not covered by said insurance or subject to any deductible or co-insurance, the Contractor shall not be reimbursed for same. Should the Contractor or its subcontractors choose to self insure this risk, it is expressly agreed that the Contractor hereby waives, and shall cause its 10-2012 00700-C9 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT subcontractors to waive, any claim for damage or loss to said property in favor of the Owner Parties. 8. Use of the Owner's Equipment. The Contractor, its agents, employees, subcontractors or suppliers shall use the Owner's equipment only with express written permission of the Owner's designated representative and in accordance with the Owner's terms and condition for such use. If the Contractor or any of its agents, employees, subcontractors or suppliers utilize any of the Owner's equipment for any purpose, including machinery, tools, scaffolding, hoists, lifts or similar items owned, leased or under the control of the Owner, the Contractor shall defend, indemnify and be liable to the Owner Parties for any and all loss or damage which may arse from such use. 9 Release and Waiver The Contractor hereby releases, and shall cause its subcontractors to release, the Owner Parties from any and all claims or causes of action whatsoever which the Contractor and/or its subcontractors might otherwise now or hereafter possess resulting in or from or in any way connected with any loss covered by insurance, whether required herein or not, or which should have been covered by insurance required herein, including the deductible and/or uninsured portion thereof, maintained and/or required to be maintained by the Contractor and/or its subcontractors pursuant to this Agreement. 10-2012 00700-C10 CITY OF PEARLAND SPECIAL CONDITIONS OF AGREEMENT Section 00800 SPECIAL CONDITIONS OF AGREEMENT The following Special Conditions modify the General Conditions,Document 00700 Where a portion of the General Conditions is modified or deleted by these Special Conditions,the unaltered portions of the General Conditions shall remain in effect. ARTICLE 1 DEFINITIONS AND INTERPRETATIONS 1 01 Add the following paragraph to the end of Article 1 01 The OWNER'S representative on the project site is. Tracy Sambrano,'City of Pearland, telephone- (281) 652-1799 The CONSTRUCTION MANAGER on the project site is. Kevin Fontenot, City of Pearland,telephone: (281) 923-6162 The CONSTRUCTION INSPECTOR on the project site is. Matt Cartwright, Freese and Nichols, Inc.,telephone: (936) 648-4812 ARTICLE 4 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR 4 05 Add the following paragraph to Article 4 05 A Maintenance Bond in accordance with Document 00612 of the Project Manual is required for this Project. The cost of this bond shall be included in the CONTRACTOR'S Bid Proposal. Attachment No. 3 To General Conditions, Owner's Insurance Requirements of Contractor, Article 4 6 Builder's Risk—Builder's Risk Insurance is Not Required for this project. ARTICLE 5 PROSECUTION AND PROGRESS 5 08 Add Article 5 08 The Contract Time as defined in the bid and other sections of the Contract Documents includes a certain number of rain days. Based on the Alvin Weather Center Records, the average annual rain days from June 1898 to December 1996 is 40 days calculated from all precipitation days of record. The CONTRACTOR is required to keep a record of rain days at the site. The record of rain days must be accepted and signed by the City Inspector monthly, and shall be reported on the monthly pay estimate submittal. At the end of the contract,the CONTRACTOR will be credited only for the number of accepted rain days that exceed 40 rain days per year,proportionate to the original Contract Time. 11-2012 00800- 1 of 2 CITY OF PEARLAND SPECIAL CONDITIONS OF AGREEMENT General Notes: Sections 00100 Invitation to Bidders, 00200 Instructions to Bidders and 01505 Mobilization all make reference to provision by the CONTRACTOR of a laptop computer for use by the OWNER'S representative or CONSTRUCTION MANAGER. BIDDER is Not Required to provide this equipment or include this cost in the Bid. See Specification 13730 for full details regarding this computer equipment. Section 01500 Temporary Facilities requires CONTRACTOR to provide field office and high speed internet access in the Field office. BIDDER is Not Required to provide a Field Office and any internet access for the duration of this project. Location and all associated permits for the Field Office shall be submitted for approval. All other requirements remain and will be required per the section. It is the responsibility of the Contractor to coordinate with the Owner for all Traffic Control Documents. Contractor to coordinate with the Owner for procurement of Traffic Control Documents prior to permitting. Contractor is to keep a minimum of one lane open at all times, in both directions. No lane closures to extend beyond the defined work day All such devices shall comply with the latest edition of the Texas Manual on Uniform Traffic Control Devices (TMUTCD). General, Special Coordination and Notes • The Contractor shall not dump any dirt or other materials onto a property being outside of the boundary of the this permitted project and within the City of Pearland city limits or surrounding counties without a valid development/grading permit issued to the offsite property owner by the City of Pearland Engineering Department or County Office. If such dumping is to occur without a valid permit,the contractor shall be solely responsible for the removal of any discarded dirt or other materials to an approved location at the contractor expense. • Disinfection of water storage facilities shall be in strict accordance with current AWWA Standard C652-11 or more current. • All clear wells, ground storage tanks, standpipes, and elevated tanks shall be painted, disinfected, and maintained in strict accordance with current AWWA standards. However, no temporary coatings,wax grease coatings, or coating materials containing lead will be allowed.No other coatings will be allowed which are not approved for use (as a contact surface with potable water)by the United States Environmental Protection Agency(EPA), NSF International, or the United States Food and Drug Administration(FDA). All newly installed coatings must conform to ANSI/NSF International Standard 61 and must be certified by an organization accredited by ANSI. END OF SECTION 11-2012 00800-2 of 2 CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION Section 00811 WAGE SCALE FOR ENGINEERING CONSTRUCTION 1 01 In accordance with the Prevailmg Wage law on Public Works (Article 2258 of the Texas Government Code),the public body awarding the contract does hereby specify the rates shown in Table 00811-A followmg to be the general prevailing rates in the locality in which the work is being performed. 1 02 This prevailmg wage rate does not prohibit the payment of more than the rates stated. 1.03 The wage scale for engineering construction is to be applied to all site work greater than five(5) feet from an extenor wall of new building under construction or from an exterior wall of an existmg building. 10-2012 00811 - 1 of 5 CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION General Decision Number TX160044 01/08/2016 TX44 Superseded General Decision Number TX20150044 State Texas Construction Type Heavy County Brazoria County in Texas HEAVY CONSTRUCTION PROJECTS (Including Water and Sewer Lines (Does Not Include Flood Control) Note Under Executive Order CEO) 13658, an hourly minimum wage of $10 15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015 If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10 15 (or the applicable wage rate listed on this wage determination, if it is higher) for a1,1 hours spent performing on the contract in calendar year 2016 The EO minimum wage rate will be adjusted annually Additional information on contractor requirements and worker protections under the EO is available at www dol gov/whd/govcontracts Modification Number Publication Date 0 01/08/2016 * SFTX0669-001 04/01/2015 Rates Fringes SPRINKLER FITTER (Fire Sprinklers) $ 27 43 17 12 SUTX2005-018 05/18/2005 Rates Fringes Carperter $ 14 38 0 00 CEMENT MASON/CONCRETE FINISHER $ 11 37 1 13 ELECTRICIAN $ 18 40 1 34 Formbuilder/Formsetter $ 9 83 1 69 IRONWORKER, REINFORCING $ 11 29 0 00 Laborers Common $ 8 99 1 25 Landscape $ 7 35 0 00 Mason Tender Cement $ 9 96 0 00 Pipelayer $ 9 63 1 50 PIPEFITTER $ 17 00 0 04 POWER EQUIPMENT OPERATOR Backhoe $ 12 74 0 00 Bulldozer $ 12 46 0 00 Crane $ 11 00 0 74 10-2012 00811 -2 of 5 CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION Excavator $ 16 74 0 00 Front End Loader $ 10 47 1 28 Grader $ 12 20 1 48 Tractor $ 11 29 1 45 TRUCK DRIVER $ 14 42 1 00 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5 5 (a) (1) (ii) ) The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local) , a survey rate (weighted average rate) or a union average rate (weighted union average rate) Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey Example PLUM0198-005 07/01/2014 PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers 0198 indicates the local union number or district council number where applicable, i e , Plumbers Local 0198 The next number, 005 in the example, is an internal number used in processing the wage determination 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014 Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates Example SULA2012-007 5/13/2014 SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates LA indicates the State of Louisiana 2012 is the year of survey on which 10-2012 00811 -3 of 5 CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION these classifications and rates are based The next number, 007 in the example, is an internal number used in producing the wage determination 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier Survey wage rates are not updated and remain in effect until a new survey is conducted Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data EXAMPLE UAVG-OH-0010 08/29/2014 UAVG indicates that the rate is a weighted union average rate OH indicates the state The next number, 0010 in the example, is an internal number used in producing the wage determination 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based WAGE DETERMINATION APPEALS PROCESS 1 ) Has there been an initial decision in the matter? This can be * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program If the response from this initial contact is not satisfactory, then the process described in 2 ) and 3 ) should be followed With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations Write to Branch of Construction Wage Determinations Wage and Hour Division U S Department of Labor 200 Constitution Avenue, N W Washington, DC 20210 2 ) If the answer to the question in 1 ) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1 8 and 29 CFR Part 7) Write to Wage and Hour Administrator 10-2012 00811 -4 of 5 CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION U S Department of Labor 200 Constitution Avenue, N W Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc ) that the requestor considers relevant to the issue 3 ) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board) Write to Administrative Review Board U S Department of Labor 200 Constitution Avenue, N W Washington, DC 20210 4 ) All decisions by the Administrative Review Board are final END OF GENERAL DECISION I � 10-2012 00811 -5 of 5 ADDENDA See Attached Issued Addenda ADDENDA PRL16146—Liberty and Suburban Garden Ground Storage Tank Rehabilitation 00900 CITY OF PEARLAND ADDENDUM Section 00902 ADDENDUM NO.2 Date: April 6, 2016 PROJECT Liberty and Suburban Garden Ground Storage Tank Rehabilitation BID NO 0216-23 BID DATE. April 8, 2016, 10.00 am FROM. William(Clay).Herndon, P.E. Freese and Nichols, Inc. 11200 Broadway, Ste. 2332 Pearland, TX 77584 To Prospective Bidders and Interested Parties This addendum forms a part of the bidding documents and will be incorporated into the Contract Documents, as applicable. Insofar as the original Contract Documents, Specifications, and Drawings are inconsistent, this Addendum shall govern. Please acknowledge receipt of this Addendum on the Bid Proposal form, Section 00300 submitted to the City of Pearland. FAILURE TO ACKNOWLEDGE RECEIPT OF ADDENDA ON THE BID PROPOSAL FORM MAY BE CAUSE FOR DISQUALIFICATION. BID LINE ITEM CORRECTIONS 1 Line 1 7 -Has been corrected in the eBid system to reflect"Site Restoration", same as on Exhibit A Bid Form. 2. Line 3 4 -Has been corrected in the eBid system to reflect"15" gallons, same as on Exhibit A Bid Form. END OF ADDENDUM NO 2 � � or FI i • WILLIAM C HERNDON Ad . ", 9 7 312 •c, w ' FCI STCF;6;•\_„ '11S A1c4I•y•F� Apr 6 2016 FREESE AND NICHOLS, INC TEXAS REGISTERED ENGINEERING FIRM F-2144 2-22-12 00902- 1 of 1 CITY OF PEARLAND ADDENDUM Section 00901 ADDENDUM NO. 1 Date: April 4, 2016 PROJECT Liberty and Suburban Garden Ground Storage Tank Rehabilitation BID NO 0216-23 BID DATE April 8, 2016, 10.00 am FROM. William(Clay)Herndon, P.E. Freese and Nichols, Inc. 11200 Broadway, Ste. 2332 Pearland, TX 77584 To Prospective Bidders and Interested Parties This addendum forms a part of the bidding documents and will be incorporated into the Contract Documents, as applicable. Insofar as the original Contract Documents, Specifications, and Drawings are inconsistent, this Addendum shall govern. Please acknowledge receipt of this Addendum on the Bid Proposal form, Section 00300 submitted to the City of Pearland. FAILURE TO ACKNOWLEDGE RECEIPT OF ADDENDA ON THE BID PROPOSAL FORM MAY BE CAUSE FOR DISQUALIFICATION. CLARIFICATIONS FROM PRE-BID MEETING. 1 Attached is the sign in sheet from the Mandatory Pre-Bid Meeting. QUESTIONS/ANSWERS FROM PRE-BID MEETING. 1 QUESTION Will a copy of the sign-in sheet be posted? ANSWER. Yes, see attached. 2. QUESTION' Water for L/P washing at location, in the bid packaged states contractor supply, or will there be water for contractor use at location? ANSWER. Water is available at both sites. The City will provide the contractor with a fire hydrant meter at no charge. 3 QUESTION 110 electrical supply, contractor supply or have plug in at location for 110 volts? ANSWER. There is power available at both sites. 4 QUESTION Field Office area for contractor I don't think we need one unless you say to add to bid? Will have sanitary facilities we will supply? ANSWER. A field office is not required. 2-22-12 00901 - 1 of 2 CITY OF PEARLAND ADDENDUM 5 QUESTION QP2 certification, will this be a factor,we have NACE certified personal, a quality system/program/procedures, company? ANSWER. The intent of the specification is for the contractor to provide quality workmanship with NACE Quality Control. 6 QUESTION What type of coating system is on the interior of the 2 tanks now?Dry mils reading of coating? ANSWER. Tank coatings and mil thicknesses can be found in the tank inspection reports found in the project manual appendix. 7 QUESTION Re-soddmg—would you know much percentage of sodding needed or is it just what contractor disturbs? ANSWER. The contractor shall restore the site to its original condition. 8 QUESTION Will contactor be able to work both location at once? ANSWER. The contractor will be able to work at both sites concurrently 9 QUESTION Will a chemical grout such as the Five Star Products chemical grouts be accepted as an alternative to the specified tank flange sealant system? ANSWER. Yes, the Five Star Products chemical grout system is an approved alternate. CONTRACT DOCUMENTS 1 Section 00500—Standard Form of Agreement: Delete Item 3 1 in its entirety and replace with the following: A. The Work will be Substantially Complete (as defined in Article 1 of the General Conditions)within 150 calendar days (including weekends and holidays) from the date when the Contract Time commences to run as provided in paragraph 5 01 of the General Conditions (as revised in the Special Conditions if applicable), and completed and ready for Final Payment within 180 calendar days from the date when the Contract Time commences to run. No work will be allowed on Sundays. END OF ADDENDUM NO 1OF ��(E .. T 1,• *• /\ *: • 0 WILLIAM C HERNDON 00 ���•• 97312 Q �cv�% t°\°'sTE �G : Ogeyssi � Apr 4 2016 FREESE AND NICHOLS, INC TEXAS REGISTERED ENGINEERING FIRM F-2144 2-22-12 00901 -2 of 2 Liberty and Suburban Garden Road Ground Storage Tank Rehabilitation Bid#0216-23 Pre-Bid Meeting Sign=ln Sheet 10:00 AM 3/29/16 _ (Please Print) 1 _ Company Name Address Company Representative j Signature �� j Email Address Telephone Number T�93 -r-Ai/ A.Fr acflael6.6 _ . - zo4tit 0-7,14J,./30-QP4 i le �'! j $ 20 t N , t (+I- qyr�m LR.P tLY�[ 77571 !�n`f'{" /1�(o��rs �- 444- 95f c ti.coAvk 2 ei-gq2-71 6Y01 fruto s�'�,�_ duaV,,p ti Ve( 2✓ / mtvv. aso d&A 4“k Kc• ce 1 gr.7 Z 7(cgg /i -d14__T4tk �yC CavIt l ,2d r ` �3?P (GnS n� 4 , C,�,r 1 cS ii • i ?� `wi.4uirk«k 0 :, �let k1S3 . et a s C i'�4 i it • (1\A°A. ` roan I d�.�, 411t isr _l kkort )o ! r^eS I�0S � j�'3�� �s� 6� 44-Ind LTG n� 2g14g&4)YgE v5i t" `1r t99`�' k3'I i eDkvk a ectcAvtr_t ~ '�'Fis��r CMG Cb��w S • 162D.1 c,�o� Dr i ,Q I0ir`i.�+`oo ho . T �2H.�o� 291-5,0 -32oo blasko ChGwnelUVewt r� JLfjt %(\1S �•-- G j CV 1 ' ___�s i.3.e2___?�ccGGt�•o�L ''? 2.4,ets A/rl.:A.i-y. a Liberty and Suburban Garden Ra__ _ ound Storage Tank Rehabilitation Bid#0216-23 Pre-Bid Meeting Sign-In Sheet 10:00.AM 3129/16 i (Please Print) I Company Name IAddress Company Representative - Signature Email Address ' Telephone Number a/ U 4 f4vla4 1 ar--_—� g Octet"t"ear ri'� (,8I- 1a1 16a r5� i'./V s°c�to1S J arei or.1je/ 4--..._ J are) 10x6el Q - rePse.cd,. <63 a- (45 G-'l1YS i r ,.. e,ividd-/ Pe.#(1- .77 6y44.2). ,..... 4 cr-A . ktg.s-r) 6,sttut4ths; a,ct4. -10 (f)tim. \._ r tek e AKA c4„s-Vrkevi.„A i:47.. Pi k• 7- yo, 4 1 ]. 1s grJC,nd.,re, Gedrsev ~� _ i CITY OF PEARLAND TECHNICAL SPECIFICATIONS DIVISION 1 TECHNICAL SPECIFICATIONS DIVISION 1 GENERAL REQUIREMENTS 04/2008 CITY OF PEARLAND SUMMARY OF WORK Section 01100 SUMMARY OF WORK 1.0 GENERAL 1.01 SECTION INCLUDES A A summary of the Work to be performed under this Contract,work by Owner,Owner furnished products, Work sequence, future Work, Contractor's use of Premises, and Owner occupancy 1.02 WORK COVERED BY CONTRACT DOCUMENTS A Work of the Contract is for the construction of the following: 1 Rehabilitation of existmg 550,000 gallon Liberty Welded Steel Ground Storage Tank including: a. Interior blastmg and coating b Install vent with vacuum relief feature c. Grade around exterior of tank to expose 3" of concrete d. Remove SAF-T Climb and install ladder and cage e. Weld Handrails around three sides of the roof hatch f. Caulk around the base of the tank at the connection to the foundation 2. Rehabilitation of existmg 428,000 gallon Suburban Garden Bolted Steel Ground Storage Tank includmg: a. Interior coating b Remove Anti-Climb device, extend ladder cage to ground level c. Extend handrails around three sides of the roof hatch d. Caulk around the base of the tank and seal at the connection to the foundation 3 Site restoration including sodding and hydro-mulch seeding as necessary ' 4 All associated construction related permits. 1.03 WORK BY OWNER A None. 1.04 OWNER FURNISHED PRODUCTS A None. 1.05 WORK SEQUENCE A Contractor shall construct the project in the following sequence: 1 Suburban Garden Bolted Steel Tank 2. Liberty Welded Steel Tank 3 Concurrent work on both plants may be possible 05/2008 01100- 1 of 2 CITY OF PEARLAND SUMMARY OF WORK B Contractor to submit project schedule to Engineer&Owner for approval as specified in Section 01300—Submittals. C Contractor shall coordinate the Work with the Engmeer and Owner as specified in Section 01040 -Coordination and Meetmgs. 1.06 FUTURE WORK A None. 1.07 CONTRACTOR'S USE OF PREMISES A Comply with procedures for access to the site and Contractor's use of nghts-of-way as specified m Section 01140 - Contractor's Use of Premises. B Contractor shall be responsible for all utilities required for construction. 1.08 OWNER OCCUPANCY A Cooperate with the Owner to minimize conflict, and to facilitate the Owner's operations. Coordinate Contractor's activities with Engineer B Schedule work to accommodate this requirement. 2.0 PRODUCTS -NotUsed 3.0 EXECUTION-NotUsed END OF SECTION 05/2008 01100-2 of 2 CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES Section 01140 CONTRACTOR'S USE OF PREMISES 1.0 GENERAL 1.01 SECTION INCLUDES A General use of the Project Site including properties inside and outside of the limits of construction, work affecting roads, ramps, streets and driveways and notification to adjacent occupants. B References to Technical Specifications. 1 Section 01350—Submittals 2 Section 01730—Cutting &Patching 3 Section 01555—Traffic Control&Regulation 4 Section 01562—Waste Material Disposal 5 Section 01720—Field Surveying 6 Section 02980—Pavement Repair 7 Section 02770—Curbs, Curb &Gutter, &Headers 8 Section 02255—Bedding, Backfill, &Embankment Materials 9 Section 02922—Sodding 10 Section 02921 —Hydromulch Seeding 1.02 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1.03 LIMITS OF CONSTRUCTION A Confine access,operations,and storage areas to limits of construction as shown on the Plans provided by Owner as stipulated in Section 00700 — General Conditions of Agreement; trespassing on abutting lands or other lands in the area is not allowed. B Contractor may make arrangements,at Contractor's cost,for temporary use of private properties,in which case Contractor and Contractor's surety shall indemnify and hold harmless the Owner against claims or demands arising from such use of properties outside of the limits of construction. 1 Improvements to private properties made for the Contractor's use must be removed upon completion of the Work. a. No fill material may be placed in temporary work areas or on adjacent private properties without the written permission of the Engineer or the issuance of a Fill Permit by the City of Pearland or other governing entity C Restrict total length which materials may be distributed along the route of the construction at any one time to 1,000 linear feet unless otherwise approved by Engineer 02/2008 01140- 1 of 4 CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES 1,04 PROPERTIES OUTSIDE OF LIMITS OF CONSTRUCTION A Altering the condition of properties adjacent to.and along the limits of construction will.not.be permitted unless authorized by the.Engineer and property owners) B Means,methods,techniques,sequences,or procedures which will result in damage to properties or.improvementsin the vicinity outside of the limits of construction will not be permitted. .0 Any damage:to properties outside:of the limits:;of construction shall.be repaired or replaced to the satisfaction of the Engineer and at no cost.to the Owner D Contractor shall protect or replace.all property corners,.monuments or other demarcations disturbed, damaged-or lost as a result of his.activities. The replacement of these devices shall be properly documented to the satisfaction of the City by a RegisteredPublic Land Surveyor with copies delivered to the Owner or private property owner 1.05 USE OF SITE A Obtain approvals of governing authorities prior to impeding or closing public roads or streets. Do not close consecutive intersections simultaneously :B Notify Engineer 48 hours prior to closing a street or a.street crossing. Permits for street closures are required in advance and are the responsibility of the Contractor C. Maintain access for emergency vehicles including.access to fire hydrants. D Avoid obstructing drainage ditches or.inlets, when obstruction is unavoidable due to requirements of the Work, provide grading and temporary drainage structures to maintain unimpeded flow. E Locate and protect private lawn sprinkler systems which may exist on rights-of-ways within the Project Site. Repair or:replace damaged systems to condition equal to or better than that existing at start of the Work. F When required by the Work,. cutting, patching, and 'fitting of Work to existing facilities,accommodating installation or connection of Work with existing facilities,or uncovering Work for access, inspection,.or:testing shall be performed in accordance with Section 01730—Cutting &Patching. G Fires:are not permitted on the Project Site. 1.06 NOTIFICATION TO ADJACENT OCCUPANTS A :Notify individual occupants in areas to' be affected by the Work of the proposed construction and time schedule. Notification shall be 24 hours,72 hours and 2 weeks prior to work being.performed within 200 feet of the homes or businesses. 02/2008 01140-2 of 4 CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES B Include in notification names and telephone numbers of two representatives for resident contact,who will be available on 24-hour call. Include precautions which will be taken to protect private property and identify potential access or utility inconvenience or disruption. C Submit proposed notification to Engineer for approval. Consideration shall be given to the ethnicity of the neighborhood where English is not the dominant language. Notice shall be in an understandable language. 1.07 EXCAVATION IN STREETS AND DRIVEWAYS A Avoid hindering or needlessly inconveniencing public travel on a street or any intersecting alley or street for more than two blocks at any one time, except by permission of the Engineer B Obtain the Engineer's approval when the nature of the Work requires closing of an entire street. Permits required for street closure are the Contractor's responsibility Avoid unnecessary inconvenience to abutting property owners. C Remove surplus materials and debris and open 1000 feet or less for public use as work in that block is complete. D Acceptance of any portion of the Work will not be based on return of street to public use. E Avoid obstructing driveways or entrances to private property F Provide temporary crossing or complete the excavation and backfill in one continuous operation to minimize the duration of obstruction when excavation is required across drives or entrances. G Provide barricades and signs in accordance with Section 01555 —Traffic Control & Regulation. 1.08 CLEAN-UP A Maintain Project Site in a neat and orderly manner B Perform daily clean-up in and around construction zone of dirt,debris,scrap materials, other disposable items. - C Leave streets, driveways, and sidewalks broom-clean or its equivalent at the end of each work day D Promptly remove bathers,signs,and components of other control systems that are no longer being utilized. E Dispose of waste and excess materials in accordance with requirements of Section 01562—Waste Material Disposal. 02/2008 01140-3 of 4 CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES 1.09 RESTORATION A Restore damaged permanent facilities to pre-construction conditions unless replacement or abandonment of facilities is indicated on the Plans. B Repair/Replace removed or damaged pavement in accordance with Section 02980— Pavement Repair and removed or damaged curbs, gutters, and headers in accordance with Section 02770 -= Curbs, Curb & Gutter, & Headers. Repair/Replace with like materials to match existing style, lines, grades, etc., unless otherwise directed by Engineer C Repair turf areas which become damaged by Contractor's operations at no additional cost to Owner Level with bank sand or topsoil, conforming to Section 02255—Bedding, Backfill, & Embankment Materials, as approved by the Engineer Provide sodding in areas of residential land use over the surface of ground disturbed during construction and not paved, or not designated to be paved, in accordance with Section 02922—Sodding. Use only block sodding; do not use spot sodding or sprigging Provide hydromulch seeding in areas of commercial, industrial or undeveloped land use over the surface of ground disturbed during construction and not paved, or not designated to be paved, in accordance with Section 02921 —Hydromulch Seeding. Water and level newly sodded areas with adjoining turf using steel wheel rollers appropriate for sodding. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 02/2008 01140-4 of 4 CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES Section 01200 MEASUREMENT AND PAYMENT PROCEDURES 1.0 GENERAL 1.01 SECTION INCLUDES A Procedures for measurement and payment of Work. B Conditions for nonconformance assessment and nonpayment for rejected products. C References to Technical Specifications. See Bid Proposal Sheet D Reference Standards 1 Concrete Reinforcing Steel Institute(CRSI) 2. American Institute of Steel Construction (MSC) 1.02 AUTHORITY A Units and methods delineated in this Section are intended to complement the criteria of the Technical Specifications and Section 00300—Bid Proposal. B In the event of conflict, the unit specified for Bid Items in Section 00300 — Bid Proposal shall govern. C Measurements and quantities submitted by the Contractor will be verified by the Engineer D Contractor shall provide necessary equipment, workers, and survey personnel as required by Engineer to-verify quantities. 1.03 UNIT QUANTITIES SPECIFIED A Quantity and measurement estimates stated in Section 00300—Bid Proposal are for contract purposes only Quantities and measurements supplied or placed in the Work, authorized and verified by Engineer shall determine payment as stated in Section 00700—General Conditions of Agreement. B If the actual Work requires greater or lesser quantities than those quantities indicated in Section 00300 — Bid Proposal, provide the required quantities at the unit prices contracted except as otherwise stated in Section 00700 — General Conditions of Agreement or in executed Change Order 1.04 MEASUREMENT OF QUANTITIES A Measurement by Weight: Reinforcing steel, rolled or formed steel or other metal shapes will be measured by CRSI or AISC Manual of Steel Construction weights. Welded assemblies will be measured by CRSI or AISC Manual of Steel Construction or scale weights. 05/2007 01200- 1 of 3 CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES B Measurement by Volume: 1 Stockpiles Measured by cubic dimension using mean length, width, and height or thickness. 2. Excavation and Embankment Materials. Measured by cubic dimension using the average end area method. C Measurement by Area. Measured by square dimension using mean length and width or radius. D Linear Measurement: Measured by linear dimension, at the item centerline or mean chord. E Stipulated Price Measurement: By unit designated in the agreement. F Other Items measured by weight, volume, area, or lineal means or combination, as appropriate, as a completed item or unit of the Work. 1.05 PAYMENT A Payment includes full compensation for all required supervision,labor,products,tools, equipment,plant,transportation,services,and incidentals,and erection,application or installation of an item of the Work; and Contractor's overhead and profit. The price bid shall include the total cost for required Work. Claims for payment as Unit Price Work not specifically covered in Section 00300—Bid Proposal will not be accepted. B Progress Payments for Unit Price Work will be based on the Engineer's observations and evaluations of quantities incorporated in the Work multiplied by the unit price. C Progress Payments for Lump Sum Work will be based on the Engineer's observations and evaluations of the percentage of quantities included in the schedule of values incorporated in the Work. D Final Payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities determined by Engineer multiplied by the unit price for Work which is incorporated in or made necessary by the Work. 1.06 NONCONFORMANCE ASSESSMENT A Remove and replace the Work, or portions of the Work, not conforming to the Contract Documents. B If,in the opinion of the Engineer,it is not practical to remove and replace the Work, the Engineer will direct one of the following remedies 1 The nonconforming Work will remain as is, but the unit pnce will be adjusted to a lower price at the discretion of the Engineer 2. The nonconforming Work will be modified as authorized by the Engineer, and the unit price will be adjusted to a lower price at the discretion of the Engineer, if the modified Work is deemed to be less suitable than originally specified. 05/2007 01200-2 of 3 CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES C Individual Technical Specifications may modify these options or may identify a specific formula or percentage price reduction. D The authority of the Engineer to assess the nonconforming Work and identify payment adjustment is final. 1.07 NONPAYMENT FOR REJECTED PRODUCTS A Payment will not be made for any of the following: 1 Products wasted or disposed of in a manner that is not acceptable to Engineer 2. Products determined as nonconforming before or after placement. 3 Products not completely unloaded from transporting vehicle. 4 Products placed beyond the lines and levels of the required Work. 5 Products remaining on hand after completion of the Work,unless specified otherwise. 6. Loading, hauling, and disposing of rejected products. 2.0 PRODUCTS - NotUsed 3.0 EXECUTION - NotUsed END OF SECTION 05/2007 01200-3 of 3 CITY OF PEARLAND CHANGE ORDER PROCEDURES Section 01290 CHANGE ORDER PROCEDURES 1.0 GENERAL 1.01 SECTION INCLUDES A Procedures for processing Change Orders, including: 1 Assignment of a responsible individual for approval and communication of changes in the Work; 2. Documentation of change in Contract Price and Contract Time; 3 Change procedures,using proposals and construction contract modifications,Work Change Directive, Stipulated Price Change Order,Unit Price Change Order, Time and Materials Change Order; 4 Execution of Change Orders, 5 Correlation of Contractor Submittals. B References to Technical Specifications 1 Section 01350—Submittals 2. Section 01760—Project Record Documents C Other References. 1 Rental Rate Blue Book for Construction Equipment(Data Quest Blue Book) Rental Rate is defined as the full unadjusted base rental rate for the appropriate item of construction equipment. 1.02 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1.03 RESPONSIBLE INDIVIDUAL A Contractor shall provide a letter indicating the name and address of the individual authorized to execute change documents, and who shall also be responsible for informing others in Contractor's employ and Subcontractors of changes to the Work. The information shall be provided at the Preconstruction Conference. 1.04 DOCUMENTATION OF CHANGE IN CONTRACT PRICE AND CONTRACT TIME A Provide full information required for identification and evaluation of proposed changes, and to substantiate costs of proposed changes in the Work. B Contractor shall document each Proposal for Change in cost or time with sufficient data to allow for its evaluation. 02/2008 01290- 1 of 4 CITY OF PEARLAND CHANGE ORDER PROCEDURES C Proposal for Change shall include, as a minimum, the following information as applicable: 1 Original Quantities of items in Section 00300—Bid Proposal with additions, reductions, deletions, and substitutions. 2. When Work items were not included in Section 00300—Bid Proposal, Contractor shall provide unit prices for the new items, with supporting information as required by the Engineer 3 Justification for any change in Contract Time. 4 Additional data upon request. D For changes in the Work performed on a time-and-material basis, the following additional information may be required. 1 Quantities and description of products and equipment. 2. Taxes, insurance and bonds. 3 Overhead and profit as noted in Section 00700—General Conditions of Agreement, 7 03 "Extra Work" 4 Dates and times work was performed, and by whom. 5 Time records and certified copies of applicable payrolls. 6. Invoices and receipts for products, rented equipment, and subcontracts, similarly documented. E Rented equipment will be paid to the Contractor by actual invoice cost for the duration of time required to complete the extra work. If the extra work comprises only a portion of the rental invoice where the equipment would otherwise be on the site,the Contractor shall compute the hourly equipment rate by dividing the actual monthly invoice by 176. (One day equals 8 hours and one week equals 40 hours.) Operating costs shall not exceed the estimated operating costs given for the item of equipment in the Blue Book. F For changes in the work performed on a time-and-materials basis using Contractor- owned equipment, compute rates with the Blue Book as follows 1 Multiply the appropriate Rental Rate by an adjustment factor of 70 percent plus the full rate shown for operating costs. The Rental Rate utilized shall be the lowest cost combination of hourly, daily, weekly or monthly rates. Use 150 percent of the Rental Rate for double shifts (one extra shift per day) and 200 percent of the Rental Rate for more than two shifts per day No other rate adjustments shall apply 2. Standby rates shall be 50 percent of the appropriate Rental Rate shown in the Blue Book. Operating costs will not be allowed. 1.05 CHANGE PROCEDURES A Changes to Contract Price or Contract Time can only be made by issuance of a Change Order Issuance of a Work Change Directive or written acceptance by the Engineer of changes will be formalized into Change Orders. All such changes will be in accordance with the requirements of Section 00700 — General Conditions of Agreement,7 01 "Change Orders" 02/2008 01290-2 of 4 CITY OF PEARLAND CHANGE ORDER PROCEDURES B The Engineer will advise Contractor of Minor Changes in the Work not involving an adjustment to Contract Price or Contract Time as authorized by Section 00700 -- General Conditions of Agreement, 7 02 "Minor Changes", by issuing supplemental instructions. C Contractor may request clarification of Plans, Technical Specifications or:Contract Documents or other information. Response by the. Engineer to a Request for Information does not authorize the Contractor to perform tasks outside the scope of the Work. All changes must be authorized as described in this Section. 1.06 PROPOSALS FOR CHANGE AND CONTRACT.MODIFICATION A The Engineer may issue a-Request for Proposal,which includes a detailed description of a proposed change with supplementary or revised Plans and Technical Specifications.The Engineer may also request a proposal in the response to a Request for Information. Contractor will prepare and submit its Proposal for Change within 7 days or as specified in the request B The Contractor may propose an unsolicited change by submitting a Proposal for Change to the Engineer describing the proposed Change and its full effect on the Work, with'a statement describing the reason for the change and the effect on the Contract Price and Contract Time including full documentation. 1.07 WORK CHANGE DIRECTIVE A Engineer may issue a signed Work Change Directive instructing the Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order B The document will describe changes in the Work and will designate a method 'of determining.any change in Contract Price or Contract Time. C Contractor shall proceed promptly to execute:the changes in the Work in accordance with the Work Change Directive. 1.08 STIPULATED PRICE CHANGE ORDER A A Stipulated Price Change Order will be based on an accepted Proposal:for Change including the Contractor's lump sum price quotation. 1.09 UNIT PRICE CHANGE ORDER A Where Unit Prices for the affected items of the Work are included in Section 003.00-. Bid Proposal ,the Unit Price Change Order will be based on unit prices as originally bid, subject to provisions of Section'00700—General Conditions of Agreement. B Where umt prices: of the Work are :not pre-determined in Section 00300 — Bid Proposal, Work Change Directive or accepted Proposal for Change will specify the unit prices to be used. 02/2008 01290-3 of 4 CITY OF PEARLAND CHANGE ORDER PROCEDURES 1.10 TIME-AND-MATERIAL CHANGE ORDER A Contractor shall provide an itemized account and supporting data after completion of change,within time limits indicated for claims in Section 00700—General Conditions of Agreement. B Engineer will determine the change allowable in Contract Price and Contract Time as provided in Section 00700—General Conditions of Agreement. C Contractor shall maintain detailed records of work done on time-and-material basis as specified in this Section, 1 04 "Documentation of Change in Contract Price and Contract Time" D Contractor shall provide full information required for evaluation of changes,and shall substantiate costs for changes in the Work. 1.11 EXECUTION OF CHANGE DOCUMENTATION A Engineer will issue Change Orders, Work Change Directives, or accepted Proposals for Change for signatures of parties named in Section 00500 — Standard Form of Agreement. 1.12 CORRELATION OF CONTRACTOR SUBMITTALS A For Stipulated Price Contracts, Contractor shall promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Price. B For Unit Price Contracts,the next monthly Application for Payment of the Work after acceptance of a Change Order will be revised to include any new items not previously included and the appropriate unit rates. C Contractor shall promptly revise progress schedules to reflect any change in Contract Time,and shall revise schedules to adjust time for other items of work affected by the change, and resubmit for review D Contractor shall promptly enter changes to the on-site and record copies of the Plans, Technical Specifications or Contract Documents as required in Section 01760 — Project Record Documents. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 02/2008 01290-4 of 4 CITY OF PEARLAND COORDINATION AND MEETINGS Section 01310 COORDINATION AND MEETINGS 1.0 GENERAL 1.01 SECTION INCLUDES A Section includes general coordination including Preconstruction Conference, Site Mobilization Conference, and Progress Meetings. B References to Technical Specifications 1 Section 01100—Summary of Work 1.02 RELATED DOCUMENTS A Coordination is required throughout the documents. Refer to all of the Contract Documents and coordinate as necessary 1.03 ENGINEER AND REPRESENTATIVES A The Engineer may act directly or through designated representatives as defined in Section 00700 — General Conditions of Agreement, 101 "Owner, Contractor, and Engineer", and as identified by name at the Preconstruction Conference. 1.04 CONTRACTOR COORDINATION A Coordinate scheduling,submittals,and work of the various Technical Specifications to assure efficient and orderly sequence of installation of interdependent construction elements. B Coordinate completion and clean up of the Work for Substantial Completion and for portions of the Work designated for Owner's partial occupancy C Coordinate access to Project Site for correction of nonconforming work to minimize disruption of Owner's activities where Owner is in partial occupancy 1.05 PRECONSTRUCTION CONFERENCE A Engineer will schedule a Preconstruction Conference. B Attendance Required. Engineer's representatives,Consultants,Contractor,and major Subcontractors. C Agenda. 1 Distribution of Contract Documents. 2. Designation of personnel representing the parties to the Contract, and the Consultant. 3 Review of insurance. 02/2008 01310- 1 of 3 CITY OF PEARLAND COORDINATION AND MEETINGS 4 Discussion of formats proposed by the Contractor for Schedule of Values, and Construction Schedule. 5 Discussion of required Submittals, including,but not limited to,Work Plans, Traffic Control Plans, Safety Programs, Construction Photographs. 6. Procedures and processing of Shop Drawings and other submittals, substitutions, Applications for Payment,Requests for Information, Request for Proposal, Change Orders, and Contract Closeout. 7 Scheduling of the Work and coordination with other contractors. 8. Review of Subcontractors. 9 Appropriate agenda items listed in this Section, 1 06 "Site Mobilization Conference", when Preconstruction Conference and Site Mobilization Conference are combined. 10 Procedures for testing. 11 Procedures for maintaining Project Record Documents. 12. Designation of the individual authorized to execute change documents and their responsibilities. 13 Discussion of requirements of a Trench Safety Program. 1.06 SITE MOBILIZATION CONFERENCE A When required by Section 01100—Summary of Work,Engineer will schedule a Site Mobilization Conference at the Project Site prior to Contractor occupancy B Attendance Required. Engineer representatives, Consultants, Contractor's Superintendent, and major Subcontractors. C Agenda. 1 Use of premises by Owner and Contractor 2. Safety and first aid procedures 3 Construction controls provided by Owner 4 Temporary utilities 5 Survey and layout 6. Security and housekeeping procedures 1.07 PROGRESS MEETINGS A Progress Meetings shall be held at Project Site or other location as designated by the Engmeer Meeting shall be held at monthly intervals, or more frequent intervals if directed by Engineer B Attendance Required. Job superintendent, major Subcontractors and suppliers, Engmeer representatives, and Consultants as appropriate to agenda topics for each meeting. C Engineer or City's representative will make arrangements for meetings,and recording minutes. D Engmeer or City's representative will prepare the agenda and preside at meetings. 02/2008 01310-2 of 3 CITY OF PEARLAND COORDINATION AND MEETINGS E Contractor shall provide required information and be prepared to discuss each agenda item. F Agenda. 1 Review minutes of previous meeting. 2. Review of Construction Schedule, Applications for Payment,payroll and compliance submittals. 3 Field observations, problems, and decisions. 4 Identification of problems which impede planned progress. 5 Review of Submittal Schedule and status of submittals. 6. Review status of Requests for Information, Requests for Proposal. 7 Review status of Change Orders. 8. Review of off-site fabrication and delivery schedules. 9 Maintenance of updates to Construction Schedule. 10 Corrective measures to regain projected schedules. 11 Planned progress during succeeding work period. 12. Coordination of projected progress. 13 Maintenance of quality and work standards. 14 Effect of proposed changes on Construction Schedule and coordination. 15 Other items relating to the Work. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 02/2008 01310-3 of 3 CITY OF PEARLAND SUBMITTALS Section 01350 SUBMITTALS 1.0 GENERAL This Section contains general lists of Submittals and Technical Specifications that may be required for the Work. When Submittals are required elsewhere in these Technical Specifications,refer to this Section for Submittal requirements and procedures. 1.01 SECTION INCLUDES A Submittal procedures for 1 Schedule of Values 2. Construction Schedules 3 Shop Drawings,Product Data, and Samples 4 Operations and Maintenance Data 5 Manufacturer's Certificates 6. Construction Photographs 7 Project Record Documents 8 Design Mixes B References to the following Technical Specifications 1 Section 01310—Coordination &Meetings 2. Section 01630—Product Options &Substitutions 3 Section 01100—Summary of Work 4 Section 01380—Construction Photographs 5 Section 01760—Project Record Documents 6. Section 02530—Gravity Sanitary Sewers 1.02 SUBMITTAL PROCEDURES A Scheduling and Handling 1 Schedule Submittals well in advance of the need for material or equipment for construction. Allow time to make delivery of material or equipment after Submittal is approved. 2. Develop a Submittal Schedule that allows sufficient time for initial review, correction,resubmission and fmal review of all submittals.The Engineer will review and return submittals to the Contractor as expeditiously as possible but the amount of time required for review will vary depending on the complexity and quantity of data submitted. In no case will a Submittal Schedule be acceptable which allows less than 30 days for initial review by the Engineer This time for review shall in no way be justification for delays or additional compensation to the Contractor 3 The Engineer's review of submittals covers conformity to the Plans,Technical Specifications, and dimensions which affect the layout. The Contractor is responsible for quantity determination. The Contractor is responsible for any errors, omissions or deviations from the Contract requirements, review of 01/2008 01350- 1 of 6 CITY OF PEARLAND SUBMITTALS submittals in no way relieves the Contractor from his obligation to furnish required items according to the Plans and Technical Specifications. 4 Submit 5 copies of documents unless otherwise specified in this Section or by individual Technical Specifications. 5 Revise and resubmit submittals as required. Identify all changes made since previous submittal. 6 The Contractor shall assume the risk for material or equipment which is fabricated or delivered prior to approval. No material or equipment shall be incorporated into the Work or included in Applications for Payment until approval has been obtained in the specified manner B Transmittal Form and Numbering 1 Transmit each submittal to the Engineer with a transmittal form. 2. Sequentially number each transmittal form beginning with the number 1 Re- Submittals shall use the original number with an alphabetic suffix(i.e.,2A for first Re-Submittal of Submittal 2 or 15C for third Re-Submittal of Submittal 15) Each submittal shall only contain one type of work, material, or equipment. Mixed submittals will not be accepted. 3 Identify variations from.requirements of Contract Documents and identify product or system limitations. 4 For submittal numbering of video tapes, see this Section, 1 10 "Video" C Contractor's Certification 1 Each submittal shall contain a statement or stamp signed by the Contractor, certifying that the items have been reviewed in detail and are correct and in _ accordance with Contract Documents, except as noted by any requested variance. 1.03 SCHEDULE OF VALUES A Submit a Schedule of Values at least 10 days prior to the first Application for Payment. A Schedule of Values shall be provided for each of the items indicated as Lump Sum (LS) in Section 00300 —Bid Proposal for which the Contractor requests to receive Progress Payments. B Schedule of Values shall be typewritten on 8-1/2"x 11",plain bond,white paper Use the Table of Contents of this Project Manual as a format for listing costs of Work by Section. C Round off figures for each listed item to the nearest$100.00 except for the value of one item, if necessary, to make the total price for all items listed in the Schedule of Values equal to the applicable Lump Sum in Section 00300—Bid Proposal. D For Unit Price Contracts, items should include a proportional share of Contractor's overhead and profit, such that the total of all items listed in the Schedule of Values equals the Contract amount. For Stipulated Price Contracts,Mobilization,Bonds,and - Insurance may be listed as separate items in the Schedule of Values. 01/2008 01350-2 of 6 CITY OF PEARLAND SUBMITTALS E For Lump Sum equipment items, where Submittals for Testing, Adjusting, and Balancing Reports in conjunction with Operation and Maintenance Data are required, include a separate item for equipment Operation and Maintenance Data Submittals and a separate item for Submittals of equipment Testing, Adjusting, and Balancing Reports, each valued at five (5)percent of the Lump Sum. F Revise the Schedule of Values and resubmit for items affected by contract modifications,Change Orders,and Work Change Directives. Submit revised Schedule of Values 10 days prior to the first Application for Payment after the changes are approved by the Engineer 1.04 CONSTRUCTION SCHEDULES A Submit Construction Schedules for the Work in accordance with the requirements of this Section. The Construction Schedule Submittal shall be,at a minimum,a bar chart, (computer generated or prepared manually) and a narrative report. B During the Preconstruction Meeting, as noted in Section 01310 - Coordination and Meetings, the Contractor shall provide a sample of the format to be used for the Construction Schedule Submittal. The format is subjeato approval by the Engineer Review of the Submittal will be provided within 7 days of the Submittal of the sample. C Within 7 days of the receipt of approval of the Contractor's format, or 14 days of the Notice to Proceed, whichever is later, the Contractor shall submit a proposed Construction Schedule for review The Construction Schedule Submittal shall meet the following requirements. 1 -The Construction Schedule shall usually include a total of at least 20 but not more than 50 activities Fewer activities may be accepted, if approved by the Engineer 2. For Projects with work at different physical locations,each location should be indicated separately within the Construction Schedule. 3 For projects with multiple crafts or significant subcontractor components,these elements should be indicated separately within the Construction Schedule. 4 For Projects with multiple types of tasks within the scope,these types of work should be indicated separately within the Construction Schedule. 5 For Projects with significant major equipment items or materials worth over 25 percent of the Total Contract Price, the Construction Schedule shall indicate dates when these items are to be purchased,when they are to be delivered,and when installed. 6. For Projects where operating plants are involved, each period of work which will require the shut down of any process or operation shall be identified in the Construction Schedule and must be agreed to by the Engineer prior to starting work in the area. 7 A Billing Schedule(tabulation of the estimated monthly billings)for the Work shall be prepared and submitted by the Contractor with the first Construction Schedule. This information is not required in the monthly updates, unless significant changes in Work require re-submittal of the Construction Schedule for review The total for each month and a cumulative total will be indicated. 01/2008 01350-3 of 6 CITY OF PEARLAND SUBMITTALS These monthly forecasts are only for planning purposes of the Engineer Monthly payments for actual work completed will be made by the Engineer in accordance with Section 00700 - General Conditions of Agreement. D The Contractor must receive approval of the Engineer for the Construction Schedule and Billing Schedule prior to the first monthly Application for Payment. No payment will be made until these are accepted. E Upon written request from the Engineer, the Contractor shall revise and submit for approval all or any part of the Construction Schedule to reflect changed conditions in the Work or deviations made from the original plan and schedule. F The Contractor's Construction.Schedule shall thereafter be updated with the Actual Start and Actual Finish Dates, Percent Complete, and Remaining Duration of each Activity and submitted monthly The ,date to be used in updating the monthly Construction Schedule shall be the same Date as is used in the monthly Application for Payment. This monthly update of the Construction Schedule shall be required before the monthly Application for Payment will be processed for payment. G The narrative Construction Schedule Report shall include a description of changes made to the Construction Schedule; Activities Added to the Construction Schedule, Activities Deleted from the Construction Schedule; any other changes made to the Construction Schedule other than the addition of Actual Start Dates and Actual Finish Dates and Remaining Durations 1.05 SHOP DRAWINGS,PRODUCT DATA,AND SAMPLES A Shop Drawings 1 Submit Shop Drawings for review as required by the Technical Specifications. 2. Contractor's Certification, as described in this Section, 1 02 "Submittal Procedures" shall be placed on each Shop Drawing. 3 The Shop Drawing shall accurately and distinctly present the following: a. Field and erection dimensions clearly identified as such. b Arrangement and section views. c. Relation to adjacent materials or structure includmg complete information for making connections between work under this Contract and work under other contracts. d. Kinds of materials and finishes. e. Parts list and descriptions. f. Assembly Shop Drawings of equipment components and accessories showing their respective positions and relationships to the complete equipment package. g. Where necessary for clarity, identify details by reference to sheet numbers and detail numbers, schedule or room numbers as shown on the Plans. 4 Shop Drawing Drawings shall be to scale,and shall be a true representation of the specific equipment or item to be furnished. 01/2008 01350-4of6 CITY OF PEARLAND SUBMITTALS B Product Data 1 Submit Product Data for review when required in individual Technical Specifications. 2. Contractor's Certification, as described in this Section, 1 02 "Submittal Procedures" shall be placed on each data item submitted. 3 Mark each copy to identify applicable products,models,options to be used in this Project. Supplement manufacturers'standard data to provide information unique to this Project, where required by the Technical Specification. 4 For products specified only by reference standard,submit manufacturer,trade name, model or catalog designation, and applicable reference standard. 5 For Approved Products, those designated in the Technical Specifications followed by the words"or approved equal",submit manufacturer,trade name, model or catalog designation, and applicable reference standard. 6. For products proposed as alternates to Approved Products, refer to Section 01630-Product Options and Substitutions, 1.04"Selection Options"and 1.07 "Substitution Procedures" 7 For products that are neither Pre-Approved, Approved, specified only by reference standard, nor proposed as alternates, submit product description, trade name, manufacturer, and supplier Contractor shall provide additional information upon written request by Engineer or Owner C Samples 1 Submit samples for review as required by the Technical Specification. 2. Contractor's Certification, as described in this Section, 1 02 "Submittal Procedures", shall be placed on each sample or a firmly attached sheet of paper 3 Submit the number of samples specified in the Technical Specification,one of which will be retained by the Engineer 4 Reviewed samples which may be used in the Work are identified in the Technical Specifications. 1.06 OPERATIONS AND MAINTENANCE DATA A When specified in Technical Specification,submit manufacturers'printed instructions for delivery, storage, assembly, installation, start-up, operation, adjusting, finishing, and maintenance. B Contractor's Certification, as described in this Section. 1 02"Submittal Procedures", shall be placed on front page of each document. - C Identify conflicts between manufacturers'instructions and Contract Documents. 1.07 MANUFACTURER'S CERTIFICATES A When specified in Technical Specification, submit manufacturers' certificate of compliance for review by Engineer B Contractor's Certification, as described in this Section, 1 02"Submittal Procedures", shall be placed on front page of the certificate. 01/2008 01350-5 of 6 CITY OF PEARLAND SUBMITTALS C Submit supporting reference data, affidavits, and certifications as appropriate. D Manufacturer's Certificates may be recent or previous test results on material or product,but must be acceptable to Engineer 1.08 CONSTRUCTION PHOTOGRAPHS A Submit photographs in accordance.with Section 01380—Construction Photographs. 1 Prints Prepare 2 prints of each view and submit 1 print directly to the City's Representative within 7 days of taking photographs. One print shall be retained by the Contractor and made available at all times for reference on the job site. B PRECONSTRUCTION PHOTOGRAPHS 1 Prior to the commencement of any construction,take digital color photographs on the entire route of the project 2. Photographs. Two prints, color, matte finish, 3 x 5 inch size, mounted on 81/2 x 11-inch soft card stock, with left edge binding margin for three hole punch, or in plastic pockets in three-ring notebook. 3 Th photographs shall show. a. Date photographs were taken b Location of the photograph, house number and street name. (This information may be shown on a chalk board in the photograph by a label on the mountings.) 4 Photographs should show the condition of the following a. Esplanades and boulevards b Yards (near, side and far side of street) c. Housewalk, sidewalk and driveway; curb d. Area between walk and curb 1) Particular features(yard lights, shrubs, fences,trees, etc.) 2) Landscaping and decorative features. C POST CONSTRUCTION PHOTOGRAPHS 1 On completion of construction,provide photographs of any public or private property which has been repaired or restored and any damage which is or may be the subject of complaints. 1.09 PROJECT RECORD DOCUMENTS A Submit Project Record Documents in accordance with Section 01760—Project Record Documents. 1.10 VIDEO A Submit television video in DVD format as required in individual Technical Specifications. B Transmittal forms for video disks shall be numbered sequentially beginning with TO1, T02, T03, etc. 01/2008 01350-6 of 6 CITY OF PEARLAND SUBMITTALS 1.11 DESIGN MIXES A When specified, submit design mixes for review B Contractor's Certification, as described in this Section, 1 02"Submittal Procedures", shall be placed on front page of each design mix. C Mark each design mix to identify proportions,gradations,and additives for each class and type of design mix submitted. Include applicable test results on samples for each mix. D Maintain a copy of approved design mixes at mixing plant. 2.0 PRODUCTS - NotUsed 3.0 EXECUTION - NotUsed END OF SECTION 01/2008 01350-7 of 6 CITY OF PEARLAND CONSTRUCTION PHOTOGRAPHS Section 01380 CONSTRUCTION PHOTOGRAPHS 1.0 GENERAL 1.01 SECTION INCLUDES A Requirements for construction photographs and submittals. B References Technical Specifications 1 Section 01100—Summary of Work 2. Section 01350—Submittals 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item, no separate payment will be made for Construction Photographs under this Section. Include cost in Bid Items for installed Work. 1.03 SUBMITTALS A When required by Section 01100 — Summary of Work, submit photographs in accordance applicable provisions of this Section. B Make Submittals required by this and related Sections under the provisions of Section 01350—Submittals. C Prepare three(3)prints of each view and submit two(2) prints directly to the Project Manager within seven(7)days of taking photographs. One(1)print shall be retained by the Contractor in the field office at the Project Site and available at all times for reference. D When requested by the Project Manager, the Contractor shall submit extra prints of photographs, for distribution directly to designated parties who will pay the costs for the extra prints directly to the photographer E When required by individual Sections, submit photographs taken prior to start of the Work to show original Project Site conditions. F When required by Contract Documents, submit photographs with Application for Payment. G When required by individual Sections,submit photographs taken following completion of the Work to show the condition in which the Project Site will be left. H With each submittal,mclude photographic negatives in protective envelopes,identified by Project Name, Contractor, and date photographs were taken. 01/2008 01380- 1 of 3 CITY OF PEARLAND CONSTRUCTION PHOTOGRAPHS 1.04 QUALITY ASSURANCE A Contractor shall be responsible for the timely execution of the photographs, their _ vantage point, direction of shot, and quality 2.0 PRODUCTS 2.01 PHOTOGRAPHS A Photographs shall be digital quality and shall be submitted on a CD B The photographs shall show on a non-elective chalkboard or white board,readable in the photograph. 1 Job number 2. Date and time photographs were taken. 3 Location of the photograph, house number and street, along with the project number C Indicate the condition of the following: 1 Esplanades and boulevards. 2. Yards (near side and far side of street). 3 House-walk and sidewalk. 4 Curb. 5 Area between walk and curb 6. Particular features (yard lights, shrubs, fence, trees, etc.) 7 Date shall be on negative. 8. Provide notation of vantage point marked for location and direction of shot on a key plan of the Project Site. D Sufficient number of photographs shall be taken to show the existence or non- existence of cracked concrete and the condition of trees, shrubs and grass. E Identify each photograph with an applied label or rubber stamp on the back with the following information. 1 Name of the Project. 2. Name and address of the photographer(if a professional photographer is used) 3 Name of the Contractor 4 Date the photograph was taken. 5 Photographs to be in plastic pockets and bound in three -ring notebook for easy access and viewing. 3.0 EXECUTION 3.01 PRECONSTRUCTION PHOTOGRAPHS A Prior to the commencement of the Work, take photographs of the entire route of the Project Site. 01/2008 01380-2 of 3 CITY OF PEARLAND CONSTRUCTION PHOTOGRAPHS 3.02 POST-CONSTRUCTION PHOTOGRAPHS A Following the completion of the Work,take photographs from corresponding vantage points and direction of shots. 3.03 PROGESS PHOTOGRAPHS A Take photographs at intervals, coinciding with the cutoff date associated with each Application for Payment and submit on CD with monthly Application for Payment. B Select the vantage points for each shot each month to best show the status of construction and progress since the last photographs were taken. Take not less than two (2) shots from the same vantage point creating a time-lapsed sequence. C Follow direction when given by the Project Manager in selecting vantage points. END OF SECTION 01/2008 01380-3 of 3 CITY OF PEARLAND REFERENCED STANDARDS Section 01420 REFERENCED STANDARDS 1.0 GENERAL 1.01 SECTION INCLUDES A General quality assurance as related to Reference Standards and a list of references. B References to Technical Specifications None 1.02 QUALITY ASSURANCE A For Products or workmanship specified by association, trade, or Federal Standards comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes. B Conform to reference standard by date of issue current on the date as stated in Section 00700—General Conditions of Agreement. C Request clarification from Engineer before proceeding should specified reference standards conflict with Contract Documents. 1.03 SCHEDULE OF REFERENCES AASHTO American Association of State Highway and Transportation Officials /111 North Capitol Street,N W Washington, DC 20001 ACI American Concrete Institute P O Box 19150 Reford Station Detroit,MI 48219-0150 AGC Associated General Contractors of Amenca 1957 E Street, N W Washington,DC 20006 AI Asphalt Institute Asphalt Institute Building College Park,MD 20740 AITC American Institute of Timber Construction 333 W Hampden Avenue Englewood, CO 80110 02/2008 01420- 1 of 5 CITY OF PEARLAND REFERENCED STANDARDS AISC American Institute of Steel Construction 400 North Michigan Avenue, Eighth Floor Chicago, IL 60611 AISI American Iron and Steel Institute 1000 16th Street, N W Washington,DC 20036 ASME American Society of Mechanical Engineers 345 East 47th Street New York, NY 10017 ANSI American National Standards Institute 1430 Broadway New York,NY 10018 APA American Plywood Association Box 11700 Tacoma,WA 98411 API American Petroleum Institute 1220 L Street, N W Washington,DC 20005 AREA American Railway Engineering Association 50 F Street,N W Washington, DC 20001 ASTM American Society for Testing-and Materials 1916 Race Street Philadelphia, PA 19103 AWPA American Wood-Preservers'Association 7735 Old Georgetown Road Bethesda, MD 20014 AWS American Welding Society PO Box 35104 Miami,FL 33135 AWWA Amencan Water Works Association 6666 West Quincy Avenue Denver,,CO 80235 02/2008 01420-2 of 5 CITY OF PEARLAND REFERENCED STANDARDS CLFMI Chain Link Fence Manufacturers Institute 1101 Connecticut Avenue, N W Washington, DC 20036 CRD U.S.A. Corps of Engineers Code of Ordinances City of Pearland 3519 Liberty Drive Pearland, TX 77581 CRSI Concrete Reinforcing Steel Institute 933 Plum Grove Road Schaumburg, IL 60173-4758 EJMA Expansion Joint Manufacturers Association 707 Westchester Avenue White Plains, NY 10604 FDA U.S Food and Drug Administration 5600 Fisher Lane Rockville, MD 20857-0001 FS Federal Standardization Documents General Services Administration, Specifications Unit(WFSIS) 7th and D Street S W Washington, DC 20406 ICEA Insulated Cable Engineer Association PO Box 440 S Yarmouth, MA 02664 IEEE Institute of Electrical and Electronics Engineers 445 Hoes Lane P O Box 1331 Piscataway, NJ 0855-1331 MIL Military Specifications General Services Admimstration, Specifications Unit(WFSIS) 7th and D Street S W Washington, DC 20406 NACE National Association of Corrosion Engineers P 0 Box 986 Katy, TX 77450 02/2008 01420-3 of 5 CITY OF PEARLAND REFERENCED STANDARDS NEMA National Electrical Manufacturers'Association 2101 L Street, N W., Suite 300 Washington, DC 20037 NFPA National Fire Protection Association Batterymarch Park, P 0 Box 9101 Quincy,MA 02269-9101 OSHA Occupational Safety Health Administration U S Department of Labor, Government Printing Office Washington,DC 20402 PCA Portland Cement Association 5420 Old Orchard Road Skokie, IL 60077-1083 PCI Prestressed Concrete Institute 201 North Wacker Drive Chicago, IL 60606 SDI Steel Deck Institute Box 9506 Canton, OH 44711 SSPC Steel Structures Painting Council 4400 Fifth Avenue Pittsburgh,PA 15213 TAC Texas Administrative Code TCEQ Texas Commission on Environmental Quality P 0 Box 13087 Austin,TX 78711-3087 TxDOT Texas Department of Transportation 125 East l lth Street Austin,TX 78701-2483 Texas MUTCD Texas Manual on Uniform Traffic Control Devices (2003 Adoption) (published by Texas Department of Transportation) UL Underwriters'Laboratories, Inc. 333 Pfingston Road Northbrook,IL 60062 UNI-BELL UNI-BELL Pipe Association 2655 Villa Creek Drive, Suite 155 02/2008 01420-4 of 5 CITY OF PEARLAND REFERENCED STANDARDS Dallas, TX 75234 WRI Wire Reinforcement Institute 942 Main Street—Suite 300 Hartford, CT 06103 WWD/PI Water Well Drillers and Pump Installers Advisory Council Texas Department of Licensing and Regulation P O Box 12157 Austin, TX 78711 2.0 PRODUCTS - NotUsed 3.0 EXECUTION - NotUsed END OF SECTION 02/2008 01420-5 of 5 CITY OF PEARLAND CONTRACTOR'S QUALITY CONTROL Section 01430 CONTRACTOR'S QUALITY CONTROL 1.0 GENERAL 1.01 SECTION INCLUDES A Quality assurance and control of installation and manufacturer's field services and reports. B References to Technical Specifications 1 Section 01350—Submittals 1.02 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1.03 QUALITY ASSURANCE/CONTROL OF INSTALLATION A Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce the Work of specified quality at no additional cost to the Owner B Comply fully with manufacturers' installation instructions, including each step in sequence. C Request clarification from Project Manager before proceeding should manufacturers' instructions conflict with Contract Documents. D Comply with specified Standards as minimum requirements for the Work except when more stringent tolerances,codes,or specified requirements indicate higher standards or more precise workmanship E Perform work by persons qualified to produce the specified level of workmanship. F Obtain copies of Standards and maintain at Project Site when required by individual Technical Specifications. 1.04 MANUFACTURERS' FIELD SERVICES AND REPORTS A When specified in individual Technical Specifications, provide material or product suppliers' or manufacturers' technical representative to observe site conditions, conditions of surfaces and installation,quality of workmanship,start-up of equipment, operator training, test, adjust, and balance of equipment as applicable, and to initiate operation,as required. Conform to minimum time requirements for start-up operations and operator training if defined in Technical Specifications. 02/2008 01430- 1 of 2 CITY OF PEARLAND CONTRACTOR'S QUALITY CONTROL B At the Project Manager's request, submit qualifications i of manufacturer's representative to Project Manager fifteen (15) days in advance of required representative's services. The representative shall be subject to approval of Project Manager C Manufacturer's representative shall report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers'written instructions. Submit report within one(1)day of observation to Project Manager for review 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 02/2008 01430-2 of 2 CITY OF PEARLAND OBSERVATION SERVICES Section 01440 OBSERVATION SERVICES 1.0 GENERAL 1.01 SECTION INCLUDES A Observation services and references. B References to Technical Specifications. 1 Section 01450—Testing Laboratory Services 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 INSPECTION A Project Manager will appoint an Observer as a representative of the Owner to oversee inspections,tests,and other services specified in individual Technical Specifications. B Alternately, Project Manager may appoint, employ, and pay an independent firm to provide additional observation or construction management services as indicated in Section 01450—Testing Laboratory Services. C Reports will be submitted by the independent firm to Project Manager,Engineer,and Contractor, indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents. D Contractor shall assist and cooperate with the Observer;furnish samples of materials, design mix, equipment,tools, and storage. E Contractor shall notify Project Manager 24 hours prior to expected time for operations requiring services. Notify Engineer and independent firm when noted. F Contractor shall sign and acknowledge report for Observer 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 09/2009 01440- 1 of 1 CITY OF PEARLAND TESTING LABORATORY SERVICES Section 01450 TESTING LABORATORY SERVICES 1.0 GENERAL 1.01 SECTION INCLUDES A Testing Laboratory Services and Contractor responsibilities related to those services. B References to Technical Specifications 1 Section 01350—Submittals C Referenced Standards 1 American Society for Testing and Materials (ASTM) a. ASTM D 3740, "Practice for Evaluation of Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction" b. ASTM E 329, "Recommended Practice for Inspection and Testing Agencies for Concrete, Steel, and Bituminous Materials as Used in Construction" 1.02 SELECTION AND PAYMENT A Owner will select,employ,and pay for services of an independent testing laboratory to perform inspection and testing identified in individual Technical Specifications. B Employment of testing laboratory shall not relieve Contractor of obligation to perform work in accordance with requirements of Contract Documents. C Owner or designated representative shall schedule and monitor testing as required to provide timely results and to avoid delay to the Work. D Contractor shall be responsible for paying for services of commercial testing laboratory, with prior approval of Owner,to perform the following: 1 Pipe diameter deflection tests on all flexible and semi-rigid sanitary sewer collection system pipe installation 2. Laboratory services required to establish mix design proposed for use for Portland cement concrete, asphaltic concrete mixtures and other material mixes requiring control by testing laboratory when required because of change in source of materials or other conditions not caused by Owner 3 Tests required to establish optimum moisture of earth and base materials and to determine required compactive effort to meet density requirements. 4 Cores to test for thickness. 5 Testing and inspection performed for the Contractor's convenience. 6. Retesting and repetitions of laboratory services when initial tests indicate work does not comply with requirements of Contract Documents. 04/2008 01450- 1 of 3 CITY OF PEARLAND TESTING LABORATORY SERVICES 1.03 LABORATORY REPORTS A The Engineer will receive 1 copy, the Project Manager will receive 2 copies, and the Contractor will receive 2 copies of Laboratory Reports from the testing laboratory One of the Contractor's copies shall remain at the Project Site for duration of Project. Test results which indicate non-conformance shall be transmitted immediately via fax from the testing laboratory to the Contractor and Project Manager 1.04 LIMITS ON TESTING LABORATORY AUTHORITY A Laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents. B Laboratory may not approve or accept any portion of the Work. C Laboratory may not assume any duties of Contractor D Laboratory has no authority to stop the Work. 1.05 CONTRACTOR RESPONSIBILITIES A Notify Project Manager and laboratory 24 hours prior to expected time for operations requiring inspection and testing services. Notify Engineer if specification section requires the presence of the Engineer B Cooperate with laboratory personnel in collecting samples to be tested or collected on Project Site. C Provide access to the Work and to manufacturer's facilities. D Provide samples to laboratory in advance of their intended use to allow thorough examination and testing. E Provide incidental labor and facilities for access to the Work to be tested,to obtain and handle samples at the site or at source of products to be tested, and to facilitate tests and inspections including storage and curing of test samples. F Arrange with laboratory and pay for. 1 Retesting required for failed tests. 2. Retesting for nonconforming Work. 3 Additional sampling and tests requested by Contractor for his own purposes. 2.0 PRODUCTS - Not Used 3.0 EXECUTION 04/2008 01450-2 of 3 CITY OF PEARLAND TESTING LABORATORY SERVICES 3.01 CONDUCTING TESTING A Laboratory sampling and testing shall conform to ASTM D 3740 and ASTM E 329,as well as other test standards specified in individual Technical Specifications. END OF SECTION 04/2008 01450-3 of 3 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS Section 01500 TEMPORARY FACILITIES AND CONTROLS 1.0 GENERAL 1.01 SECTION INCLUDES A Temporary facilities and the necessary controls for the Work including utilities, telephone, sanitary facilities, field office, storage sheds and building, safety requirements,first aid equipment,fire protection,security measures,protection of the Work and property, access roads and parking, environmental controls, disposal of trash,debris,and excavated material,pest and rodent control,water runoff and erosion control. B References to Technical Specifications. Section 00200—Instructions to Bidders Section 01100—Summary of Work Section 01350—Submittals Section 01566—Source Controls for Erosion& Sedimentation Section 01100—Summary of Work Section 01600—Material&Equipment Section 01570—Trench Safety System Section 01555—Traffic Control&Regulation Section 01720—Field Surveying Section 01563•—Tree&Plant Protection Section 01564—Control of Ground Water& Surface Water Section 13730-Computer Equipment C Referenced Standards. Occupational Safety and Health Administration(OSHA) National Fire Protection Association(NFPA) Code of Ordinances, City of Pearland, Texas D Definitions. Underground Structures - sewer, water, gas, and other piping, and manholes, chambers, electrical and signal conduits, tunnels, and other existing subsurface installations located within or adjacent to the limits of the Work. Surface Structures - existing buildings, structures and other constructed installations above the ground surface. Included with such structures are their foundations or any extension below the surface. Surface structures include, but are not limited to 12-2-2011 01500- 1 of 11 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS buildings,tanks,walls, bridges,roads, dams, channels, open drainage,piping,poles, wires,posts, signs, markers, curbs, walks, guard cables, fencing, and other facilities that are visible above the ground surface. 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Contractor to submit proposed location, size and model number of Field Office to be approved by the Owner's Representative. 1.04 CONTRACTOR'S RESPONSIBILITY A The facilities and controls specified in this Section are considered minimum for the Work. The Contractor may provide additional facilities and controls for the proper execution of the Work and to meet Contractor's responsibilities for protection of persons and property B Comply with applicable requirements specified in other Technical Specifications. Maintain and operate temporary facilities and systems to assure continuous service. Modify and extend systems as Work progress requires. Completely remove temporary materials and equipment when their use is no longer required. Restore existing facilities used for temporary services to specified or to original condition. 1.05 TEMPORARY UTILITIES A Temporary Service Make arrangements with utility service companies for such temporary services as are necessary to construct the work and manage the site. Abide by rules and regulations of the utility service companies or authonties having jurisdiction. Be responsible for utility service costs until the Work is Substantially Complete. Included are fuel,power,light,heat,and other utility services necessary for execution, completion, testing, and initial operation of the Work. 12-2-2011 01500-2 of 11 CITY OF PEARLAND i TEMPORARY FACILITIES AND CONTROLS B Water Provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices, or for other use as required for proper completion of the Work. For water to be drawn from public water supply, obtain special permit or license and meter from the proper City officials. For facilities under construction, establish a water/sewer billing account with City's Utility Billing Department.A deposit based on rates established by latest ordinance will be required. For water drawn from fire hydrants, apply for and receive a construction water meter from City'Public Works Department. Identify specific location for construction water meter installation. Once installed,water meter may not be moved without notification of Public Works Department. Install backflow preventer on fire hydrant supply if not included in City provided meter Provide and maintain an adequate supply of potable water for domestic consumption by Contractor personnel. C Electricity and Lighting 1 Provide temporary electric power service in Contractor's name, as required for the prosecution of the Work, including testing of Work. Provide power for lighting, operation of the Contractor's equipment, or for any other use by Contractor or as necessary to mamtam any of Owner's on-going operations as may contmue on the site during any scheduled shutdown. Minimum lighting level shall be 5 foot-candles for open areas, 10 foot-candles for stairs and shops. 2 Provide permanent electric power service,in the Contractor's name,to the work or site as and when required by the schedule of the work to achieve Substantial Completion or Partial Substantial Completion.Contractor to establish service billing in its name and transfer service and billing to the Owner upon acceptance of the work as Substantially Complete and suitable for beneficial occupancy by the Owner D Natural Gas Provide and pay for natural gas service to the work as and when required by the schedule to achieve Substantial Completion. Contractor to establish service billing in its name and transfer service and billing to the Owner upon acceptance of the work as Substantially Complete and suitable for beneficial occupancy by the Owner E Temporary Heat and Ventilation Provide temporary heat as necessary for protection or completion of the Work. Provide temporary heat and ventilation to assure safe working conditions, maintam enclosed areas at a minimum of 50 degrees F 12-2-2011 01500-3 of 11 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS F Telephone Provide emergency telephone service at the Project Site for use by Contractor personnel and others performing work or furnishing services. G Sanitary Facilities Provide and maintain sanitary facilities for persons on the Project Site,m compliance with federal, state, and local regulations. Locate toilets on the Project Site near the work and secluded from view insofar as possible. Keep toilets clean and supplied throughout the course of the Work. Enforce the use of sanitary facilities by construction personnel at the Project Site. Such facilities shall be enclosed. Pit-type toilets will not be permitted. No discharge will be allowed from these facilities. Collect and store sewage and waste so as not to cause a nuisance or health problem, have sewage and waste hauled off-site and properly disposed in accordance with local regulations. Control areas where sanitary facilities are located m conformance with Section 01566 —Source Controls for Erosion& Sedimentation. 1.06 FIELD OFFICE A Provision of a Field Office and other specific temporary facilities as required in paragraph B below UNLESS otherwise stated in Section 00800 - Special Conditions of the Agreement,or Section 01100—Summary of Work. Provide for - transportation,move-in, set-up,tie-down and,when project is complete,removal and move-out. The Contractor shall confirm location of office and other temporary facilities with Owner's Representative at Pre-Construction Meeting prior to delivery and set up Location of temporary facilities shall be approved by the Owner's Representative by way of the submittal process. B At a minimum, the Contractor's field office shall provide for, contain or serve to provide a secured space for project administrative operations, periodic progress meetings,on-site storage for project files and plans,office space for CONTRACTOR's field supervisory personnel and provide a separate securable office space for OWNER's Representative including: meeting space, table and chairs with enough space for a minimum of 8 people,a single two drawer filing cabinet,a built-in drawing table and plan holders. Provide electric lighting and HVAC to the mobile office. 1 Field Office shall provide for, at a minimum, a high speed intemet connection for use by Owner's Representative or Construction Manager as controlled by Paragraph A above. 1.07 STORAGE OF MATERIALS A Provide for storage of materials under the provisions of Section 01600—Material& Equipment. 12-2-2011 01500-4 of 11 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS 1.08 SAFETY REQUIREMENTS A Contractor shall prepare, submit and follow a Safety Program that complies with federal, state, and local safety codes, statutes, and practices. Include in the Safety Program documented response to excavation, embankment, and trench safety requirements as specified in Section 01570—Trench Safety System. B Conduct operations in strict accord with applicable federal,state and local safety codes and statutes and with good construction practice. The Contractor is fully responsible and obligated to establish and maintain procedures for safety of all work,personnel and equipment involved in the Work. C Observe and comply with Texas Occupational Safety Act (Art. 5182a, V C.S ) and with all safety and health standards promulgated by Secretary of Labor under Section 107 of Contract Work Hours and Standards Act,published in OSHA Standards -29 CFR, Part 1926, and adopted by Secretary of Labor under the Williams-Steiger Occupational Safety and Health Act of 1970, and to any other legislation enacted for safety and health of Contractor employees. Such safety and health standards apply to subcontractors and their employees as well as to the Contractor and its employees. D Observance of and compliance with the regulations shall be solely and without qualification the responsibility of the Contractor without reliance or superintendence of or direction by the Engineer or the Engineer's representative. Immediately advise the Engineer of investigation or inspection by Federal Safety and Health inspectors of the Contractor or subcontractor's work or place of work on the Project Site under this Contract,and after such investigation or inspection,advise the Engineer of the results. Submit one copy of accident reports to Engineer within ten(10) days of occurrence. E Protect areas occupied by workmen using the best available devices for detection of lethal and combustible gases. Test such devices frequently to assure their functional capability Constantly observe infiltration of liquids into the Work area for visual or odor evidence of contamination. Take immediate and appropriate steps to seal off entry of contaminated liquids to the Work area. F Safety measures, including but not limited to safety personnel, first-aid equipment, ventilating equipment and safety equipment,in the Plans and Technical Specifications are obligations of the Contractor G Mamtam required coordmation with the local Police and Fire Departments during the entire period covered by the Contract. 1.09 FIRST AID EQUIPMENT A Provide a first aid kit throughout the construction period. List telephone numbers for physicians,hospitals, and ambulance services in each first aid kit. B Have at least one person thoroughly trained in first aid procedures present on the Project Site whenever work is in progress. 12-2-2011 01500-5 of 11 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS 1.10 FIRE PROTECTION A Fire Protection Standards. Conform to specified fire protection and prevention requirements as well as those that may be established by Federal, State, or local governmental agencies. B Comply with all applicable provisions of NFPA Standard No 241, Safeguarding Building Construction and Demolition Operations. Provide portable fire extinguishers, rated not less than 2A or 5B in accordance with NFPA Standard No 10,Portable Fire Extinguishers,for each temporary building,and for every 3000 square feet of floor area of facilities under construction. Locate portable fire extinguishers within 50 feet maximum from any point on the Project Site. C Fire Prevention and Safety Measures. Prohibit smoking in hazardous areas. Post suitable warning signs in areas that are continuously or intermittently hazardous. Use metal safety containers for storage and handling of flammable and combustible liquids. Do not store flammable or combustible liquids in or near stairways or exits. Maintain clear exits from all points within a structure. 1.11 SECURITY MEASURES A Protect all materials, equipment, and property associated with the Work from loss, theft,damage,and vandalism. Contractor's duty to protect property includes Owner's property B If existing fencing or barriers are breached or removed for purposes of construction, provide and maintain temporary security fencing equal to existing as approved by Owner's Representative. 1 12 PROTECTION OF PUBLIC UTILITIES A Prevent damage to existing public utilities during construction. These utilities are shown on the Plans at their approximate locations. Give owners of these utilities at least 48 hours notice before commencing Work in the area, for locating the utilities during construction,and for making adjustments or relocation of the utilities when they conflict with the proposed Work. 1.13 PROTECTION OF PEOPLE AND PROPERTY A Preventive Actions. Take precautions,provide programs, and take actions necessary to protect the Work and public and private property from damage. 12-2-2011 01500-6of11 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS Take action to prevent damage, injury or loss, including, but not limited to, the followmg: a. Store apparatus,materials,supplies,and equipment m an orderly,safe manner that will not unduly interfere with progress of the Work or the Work of any other contractor, any utility service company, or the Owner's operations. b Provide suitable storage for materials that are subject to damage by exposure to weather, theft,breakage, or otherwise. c Place upon the Work or any part thereof only such loads as are consistent with the safety of that portion of the Work. d. Frequently clean up refuse,rubbish,scrap materials,and debris caused by construction operations,keeping the Work safe and orderly e. Provide safe barricades and guard rails around openings, for scaffoldmg, for temporary stairs and ramps, around excavations, elevated walkways, and other hazardous areas. Obtain written consent from proper parties before entering or occupying with workers, tools,materials or equipment,privately owned land except on easements provided for construction. Assume full responsibility for the preservation of public and private property on or adjacent to the site. If any direct or indirect damage is done by or on account of any act, omission, neglect, or misconduct in execution of the Work by the Contractor, it shall be restored by the Contractor to a condition equal to or better than that existing before the damage was done. B Barricades and Warning Signals. Where Work is performed on or adjacent to any roadway, right-of-way, or public place, furnish and erect barricades, fences, lights,warning signs, and danger signals, provide watchmen,and take other precautionary measures for the protection of persons or property and protection of the Work.Conform to Section 01555—Traffic Control& Regulation. C Preserving Control Points Maintain permanent benchmarks,public or private elevation or property demarcation and control monumentation, or other reference points. Unless otherwise directed in wnting,replace at no cost to the Owner,those monuments,property corners or other permanent demarcations that are damaged or destroyed in accordance with Section 01720—Field Surveying. D Tree and Plant Protection. Protect trees, shrubs,lawns, outside of grading limits and within the grading limits as designated on the Plans,and in accordance with requirements of Section 01563—Tree &Plant Protection. 12-2-2011 01500-7 of 11 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS E Protection of Underground and Surface Structures Known underground structures, including water, sewer, electric, and telephone services are shown on the Plans in accordance with the best information available,but is not guaranteed to be correct or complete. Contractor is responsible for making Locate Calls. Explore ahead of trenching and excavation work and uncover obstructing underground structures sufficiently to determine their location, to prevent damage to them and to prevent interruption of utility services. Restore to original condition damages to underground structure at no additional cost to the Owner Immediately notify the agency or company owning any existing utility which is damaged,broken,or disturbed. Obtain approval from the Engineer and agency for any repairs or relocations, either temporary or permanent. Necessary changes in location of the Work may be made by the Engmeer to avoid unanticipated underground structures. If permanent relocation of an underground structure or other subsurface installations is required and not otherwise provided for in the Contract Documents,the Engineer will direct Contractor in writing to perform the Work, which shall be paid for under the provisions for changes in the Contract Pnce as described in Section 00700—General Conditions of Agreement. Support in place and protect from direct or indirect injury to underground and surface structures located within or adjacent to the limits of the Work. Install such supports r- carefully and as required by the party owning or controlling such structure. Before installing structure supports,Contractor shall satisfy the Engineer that the methods and procedures to be used have been approved by the owner of the structure. Avoid moving or in any way changing the property of public utilities or private service corporations without prior written consent of a responsible official of that service or public utility Representatives of these utilities reserve the right to enter within the limits of this project for the purpose of maintaining their properties,or of making such changes or repairs to their property that may be considered necessary by performance of this Contract. Notify the owners and/or operators of utilities and pipelines of the nature of construction operations to be performed and the date or dates on which those operations will be performed. When construction operations are required in the immediate vicimty of existing structures,pipelines,or utilities,give a minimum of five (5)working days advance notice. Probe and flag the location of underground utilities pnor to commencement of excavation. Keep flags in place until construction operations reach and uncover the utility Assume nsks attending the presence or proximity of underground and surface structures within or adjacent to the limits to the Work including but not limited to damage and expense for direct or indirect injury caused by the Work to any structure. Immediately repair damage caused, to the satisfaction of the owner of the damaged structure. 12-2-2011 01500-8 of 11 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS 1.14 PROTECTION OF THE WORK Provide protection of installed products to prevent damage from subsequent operations. Remove protection facilities when no longer needed,prior to completion of the Work. Control traffic to prevent damage to equipment,materials, and surfaces. 1.15 ROADS AND PARKING - A Prevent interference with traffic and Owner operations on existing roads. B Minimize use of existing streets and driveways by construction traffic. C Control traffic to prevent damage to equipment, materials, and surfaces. D Construct and maintain temporary detours, ramps, and roads to provide for normal public traffic flow when use of public roads or streets is closed by necessities of the Work. E Provide mats or other means to prevent overloading or damage to existing roadways from tracked equipment or exceptionally large or heavy trucks or equipment F Designate temporary parking areas to accommodate construction personnel. When site space is not adequate, provide additional off-site parking. Locate as approved by Engineer G Do not allow heavy vehicles or construction equipment unnecessarily in existing parking,areas. 1.16 ENVIRONMENTAL CONTROLS A Provide and maintain methods, equipment, and temporary construction as necessary for controls over environmental conditions at the construction site and adjacent areas. B Comply with statutes,regulations,and ordinances which relate to the proposed Work for the prevention of environmental pollution and preservation of natural resources, including but not limited to the National Environmental Policy Act of 1969, PL 91- 190, Executive Order 11514 C Provide, install and maintain storm water runoff control includmg but not limited to temporary entrance, silt fencing, etc. as specified in Contract Documents. D Recognize and adhere to the environmental requirements of the Project. Disturbed areas shall be strictly limited to boundaries established by the Contract Documents. Burning of rubbish, debns or waste materials is not permitted. 12-2-2011 01500-9 of 11 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS 1.17 POLLUTION CONTROL , A Provide methods,means,and facilities required to prevent contamination of soil,water or atmosphere by discharge of noxious substances from construction operations. B Provide equipment and personnel to perform emergency measures required to contain any spillage,and to remove contaminated soils or liquids. Excavate and dispose of any contaminated earth off-site, and replace with suitable compacted fill and topsoil. C Take special measures to prevent harmful substances from entering receivmg streams or storm water conveyance systems in conformance with TPDES requirements and Section 01566—Source Controls for Erosion& Sedimentation. D Provide systems for control of atmospheric pollutants. Prevent toxic concentrations of chemicals. Prevent harmful dispersal of pollutants into the atmosphere. E Use equipment during construction that conforms to current federal, state, and local laws and regulations. 1.18 PEST AND RODENT CONTROL A Provide rodent and pest control as necessary to prevent infestation of Project Site. B Employ methods and use materials which will not adversely affect conditions at the Project Site or adjoining properties. 1.19 NOISE CONTROL A Provide vehicles, equipment, and construction activities that minimize noise to the greatest degree practicable. Noise levels shall conform to OSHA Standards- 29 CFR and in no case will noise levels be permitted which create a nuisance in the surrounding neighborhoods. B Conduct construction operations during daylight hours from 7.30 a.m. to 6.00 p.m. except as approved by Engineer C Comply with Chapter 19 NOISE, Codes of Ordinances, City of Pearland, Texas. 1.20 DUST CONTROL A Control objectionable dust caused by operation of vehicles and equipment under the provisions of Section 01566—Source Controls for Erosion& Sedimentation. 1.21 WATER RUNOFF AND EROSION CONTROL A Provide methods to control surface water,runoff,subsurface water,and water pumped from excavations and structures to prevent damage to the Work, the Project Site, or 12-2-2011 01500-10 of 11 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS adjoining properties in accordance with Section 01564—Control of Ground Water& Surface Water and Section 01566—Source Controls for Erosion& Sedimentation. B Inspect earthwork periodically to detect any evidence of the start of erosion. Apply corrective measures as required to control erosion. 2.0 PRODUCTS - NotUsed 3.0 EXECUTION - NotUsed END OF SECTION 12-2-2011 01500- 11 of 11 CITY OF PEARLAND MOBILIZATION Section 01505 MOBILIZATION 1.0 GENERAL 1.01 SECTION INCLUDES A Mobilization of construction equipment and facilities onto the Work. B Referenced Standards 1 Texas Department of Transportation(TxDOT) 2. Texas Manual on Uniform Traffic Control Devices (Texas MUTCD) 1.02 MEASUREMENT AND PAYMENT A. Payment for Mobilization is on a Lump Sum basis and shall not exceed three percent (3%) of the total bid price. B Payment for 50% of the Mobilization lump sum bid item may be included in the first monthly Application for Payment. Payment is subject to the receipt and approval by Engineer of the following items, as applicable. 1 Schedule of Values (Section 01350—Submittals) 2. Trench Safety Program(Section 01570—Trench Safety System) 3 Construction Schedule (Section 01350—Submittals) 4 Pre-construction Photographs (Section 01380—Construction Photographs) 5 Installation and acceptance of Project Identification Sign(s) (Section 01580—Project Identification Signs) 6 Installation and acceptance of Field Office (Section 01500—Temporary Facilities and Controls) 7 Installation and acceptance of TPDES requirements (Section 01565 - TPDES Requirements) C Payment for 25% of the Mobilization lump sum bid item may be included in the second monthly Application for Payment. Payment is subject to the receipt and approval by Engineer of the following items, as applicable- 1 Installation of High Speed Internet Access (Section 01500—Temporary Facilities and Controls) 2. Laptop Computer(Section 00800—Special Conditions of Agreement) D Payment for 15% of the Mobilization lump sum bid item may be included in the third monthly Application for Payment. E. Payment for the remaining 10% of the Mobilization lump sum bid item may be included in the fourth monthly Application for Payment. 09/2012 01505- 1 of2 CITY OF PEARLAND MOBILIZATION G Mobilization payments will be subject to Retainage as stipulated in Section 00700 - General Conditions of Agreement. 2.0 PRODUCTS 2.01 PROJECT IDENTIFICATION SIGNS A. Provide specified number of project identification sign(s)per Section-01580 The name, address and contact information of the general contractor for the project - shall be shown on the sign per Section 01580 and the attached exhibit. 3.0 EXECUTION 3.01 PLACEMENT OF PROJECT IDENTIFICATION SIGNS A. Place a Project Identification Sign as described in Section 01580,part 1 03,D visible to passing traffic or as directed by Engineer END OF SECTION 09/2012 01505-2 of 2 CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS Section 01550 STABILIZED CONSTRUCTION EXITS 1.0 GENERAL 1.01 SECTION INCLUDES A Installation of erosion and sediment control for Stabilized Construction Exits used during construction and until fmal development of the Project site. B References to Techmcal Specifications. 1 Section 01350—Submittals 2. Section 01562—Waste Material Disposal, 3 Section 01565—TPDES Requirements 4 Section 01566—Source Controls for Erosion& Sedimentation C Referenced Standards. 1 American Society of Testing and Materials (ASTM) a. ASTM D 4632, "Standard Test Method for Grab Breaking Load and Elongation of Geotextiles" 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required in this Section under the provisions of Section 01350 — Submittals. B Manufacturer's catalog sheets and other product data on Geotextile fabric. C Sieve analysis of aggregates conforming to requirements m this Section,2.02"Course Aggregates" 2.0 PRODUCTS 2.01 GEOTEXTILE FABRIC A _ Provide woven or non-woven geotextile fabric made of either polypropylene, polyethylene, ethylene, or polyamide material. B By ASTM D 4632, geotextile fabric shall have a minimum grab strength of 270 psi any principal direction, and the equivalent opening size between 50 and 140 C Both the geotextile and threads shall be resistant to chemical attack,mildew, and rot and shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable life at a temperature range of 0°F to 120°F 12/2015 01550- 1 of 3 CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS D Representative Manufacturers. Mirafi, Inc., Or-Equal. 2.02 COARSE AGGREGATES A Coarse aggregate shall consist of crushed stone,gravel,concrete,crushed blast furnace slag,or a combmation of these materials. Aggregate shall be composed of clean,hard, durable materials free from adherent coatings, salt,alkali,dirt,clay,loam, shale, soft or flaky matenals, or organic and injurious matter B Course aggregates shall be open graded with a size 3"to 6" 3.0 EXECUTION 3.01 PREPARATION AND INSTALLATION A The Contractor shall provide stabilized construction exits at the construction,staging, parking, storage, and disposal areas to keep the street clean of mud carried by construction vehicle and equipment. Such erosion and sediment controls shall be constructed in accordance with the requirements shown on the Plans and specified in this Section. B Erosion and sediment control measures shall be in place prior to the start of any Work that exposes the soil, other than as specifically directed by the Engineer to allow soil testing and surveying. C Maintain existing erosion and sediment control systems located within the Project Site until acceptance of the Work or until directed by the Engineer to remove and discard the existmg system. Maintenance shall be performed routinely to remove soil build up or, as required by the Engineer. D Regularly mspect and repair or replace components of stabilized construction exits. Unless otherwise directed, maintain them until the Work is accepted by the Owner Remove stabilized construction exits promptly when directed by the Engineer Discard removed materials in accordance with Section 01562 — Waste Material Disposal. E Equipment and vehicles shall be prohibited by the Contractor from maneuvenng on areas outside of dedicated nghts-of-way and easements for construction. Damage caused by construction traffic to erosion and sediment control systems, mcluding vegetative systems shall be repaired immediately F Conduct all construction operations under this Contract in conformance with the erosion control practices described in the Section 01566-Source Controls for Erosion & Sedimentation and Section 01565 TPDES Requirements. 3.02 CONSTRUCTION METHODS A Provide stabilized access roads, subdivision roads, parkmg areas, and other on-site vehicle transportation routes where shown on Plans. 12/2015 01550-2 of 3 CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS B Provide stabilized construction exits, and truck washing areas when approved by Engineer, of the sizes and locations where shown on Plans or as specified m this Section. C Vehicles leaving construction areas shall have their tires cleaned to remove sediment pnor to entrance onto public right-of-way When washing is needed to remove sediment, Contractor shall construct a truck washing area. Truck washing shall be, done on stabilized areas which drain into a drainage system protected by erosion and sediment control measures. D Details for Stabilized Construction Exits are shown on the Plans. Construction of all other stabilized areas shall be to the same requirements. Roadway width shall be at least 14 feet for one-way traffic and 20 feet for two-way traffic and shall be sufficient for all ingress and egress. Furnish and place geotextile fabric as a permeable separator to prevent mixmg of coarse aggregate with underlying soil. Exposure of geotextile fabric to the elements between laydown and cover shall be a maximum of 14 days to minimize damage potential. E Roads and parking areas shall be graded to provide sufficient drainage away from stabilized areas. Use sandbags,gravel,boards,or similar methods to prevent sediment from entermg public right-of-way, receiving stream or storm water conveyance system. F The stabilized areas shall be inspected and maintained daily Provide periodic top dressing with additional coarse aggregates to maintain the required depth. Repair and clean out damaged control measures used to trap sediment. All sediment spilled, dropped,washed,or tracked onto public right-of-way shall be removed immediately G The length of the stabilized area shall be as shown on the Plans,but not less than 50 feet. The thickness shall not be less than 8 inches. The width shall not be less than full width of all points of ingress or egress. H Stabilization for other areas shall have the same coarse aggregate,thickness,and width requirements as the stabilized construction exit,except where shown otherwise on the Plans. I Stabilized area may be widened or lengthened to accommodate truck washing area when authorized by Engmeer J Alternative methods of construction may be utilized when shown on Plans, or when approved by the Engmeer END OF SECTION 12/2015 01550-3 of 3 CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION Section 01555 TRAFFIC CONTROL AND REGULATION 1.0 GENERAL 1.01 SECTION INCLUDES A Requirements for traffic control plans,signs,signals,control devices,flares,lights and traffic signals, as well as construction parking control, designated haul routes and bridging of trenches and excavations. B Requirements for and qualifications of Flaggers. C References to Technical Specifications 1 Section 01350—Submittals 2. Section 01140—Contractor's Use of Premises D Referenced Standards. 1 Texas Manual on Uniform Traffic Control Devices (Texas MUTCD) 1.02 MEASUREMENT AND PAYMENT A Traffic Control and Regulation. Measurement is on a Lump Sum basis for Traffic Control and Regulation,including submittal of a traffic control plan if different from the one provided on the Plans, provision of traffic control devices, and provision of equipment and personnel as necessary to protect the Work and the public. The amount invoiced shall be determined based on the Schedule of Values submitted for traffic control and regulation. B Flaggers. Measurement is on a Lump Sum basis for Flaggers as required for the Work. The amount invoiced shall be determined based on the Schedule of Values submitted for Flaggers. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B A Traffic Control Plan responsive to the Texas MUTCD and sealed by a Registered Professional Engineer is incorporated into the Plans. If the Contractor proposes to implement traffic control different than the plan provided, he shall submit a Traffic Control Plan in conformance with Texas MUTCD for approval of the Engineer C For both the Traffic Control Plan and Flaggers' use, submit Schedules of Values within 30 days following the Notice to Proceed. D Each week submit a daily log for Flaggers listing name,badge number,time start,time finish, and hours worked. 03/2008 01555- 1 of 4 CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION 1.04 FLAGGERS A Unless otherwise specified, use only Flaggers who are off-duty,regularly employed, uniformed Peace Officers. B Flaggers are required at the following locations 1 Where multi-lane vehicular traffic must be diverted into single-lane vehicular traffic. 2. Where vehicular traffic must change lanes abruptly 3 Where construction equipment either enters or crosses vehicular traffic lanes and walks. 4 Where construction equipment may intermittently encroach on vehicular traffic lanes and unprotected walks and cross-walks. 5 Where construction activities might affect public safety and convenience. 6. Where traffic regulation is needed due to rerouting of vehicular traffic around the work site. 7 When requested by Owner C The use of Flaggers is for the purpose of assisting in the regulation of traffic flow and movement, and does not in any way relieve the contractor of full responsibility for taking such other steps and provide such other Flaggers or personnel as the Contractor may deem necessary to protect the work and the public, and does not in any way relieve the Contractor of his responsibility for any damage for which he would otherwise be liable. Flaggers shall be used and maintained at such points for such periods of time as may be required to provide for the public safety and convenience of travel. 2.0 PRODUCTS 2.01 SIGNS,SIGNALS,AND DEVICES A Comply with Texas MUTCD regulations. B Traffic Cones and Drums, Flares and Lights. As approved by agencies having jurisdiction. 3.0 EXECUTION 3.01 PUBLIC ROADS A Abide by laws and regulations of governing authorities when using public roads. If the Contractor's work requires that public roads be temporarily impeded or closed, approvals shall be obtained from governing authonties and permits paid for before starting any work. Coordinate activities with the Engineer B Contractor shall maintain at all times a 10-foot-wide all-weather lane adjacent to work areas which shall be kept free of construction equipment and debris and shall be for the use of emergency vehicles, or as otherwise provided in the Traffic Control Plan. 03/2008 01555-2 of 4 CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION C Contractor shall not obstruct the normal flow of traffic from 7.00 a.m.to 9.00 a.m.and 4.00 p.m. to 6.00 p.m. on designated major arterials or as directed by the Engineer D Contractor shall maintain local driveway access to residential and commercial properties adjacent to work areas at all times. E Cleanliness of Surrounding Streets. 1 Keep streets used for entering or leaving the job area free of excavated material, debris, and any foreign material resulting from construction , operations. Leave the area broom-clean or its equivalent at the end of the work day F Control vehicular parking to prevent interference with public traffic and parking,and access by emergency vehicles. G Monitor parking of construction personnel's vehicles in existing facilities. Maintain vehicular access to and through parking areas. H Prevent parking on or adjacent to access roads or in non-designated areas. 3.02 FLARES AND LIGHTS A Provide flares and lights during hours of low visibility to delineate traffic lanes and to guide traffic. 3.03 HAUL ROUTES A Utilize haul routes designated by Owner or shown on the Plans for construction traffic. B Confine construction traffic to designated haul routes. C Provide traffic control at critical areas of haul routes to regulate traffic and minimize , interference with public traffic. D Contractor shall be responsible for any damage caused by vehicles utilizing haul routes. 3.04 TRAFFIC SIGNS AND SIGNALS A Install traffic control devices at approaches to the site and on site, at crossroads, detours, parking areas, and elsewhere as needed to direct construction and affected public traffic. B Relocate traffic signs and control devices as Work progresses to maintain effective traffic control. 3.05 BRIDGING TRENCHES AND EXCAVATIONS A Whenever necessary,bridge trenches and excavation to permit an unobstructed flow of traffic. 03/2008 01555-3 of 4 CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION B Secure bridging against displacement by using adjustable cleats,angles,bolts or other devices whenever bridge is installed. 1 On an existing bus route; 2. When more than five percent of daily traffic is comprised of commercial or truck traffic; 3 When more than two separate plates are used for the bridge; or 4 When bridge is to be used for more than five consecutive days. C Install bridging to operate with minimum noise. D Adequately shore the trench or excavation to support bridge and traffic. E Extend steel plates used for bridging a minimum of one foot beyond edges of trench or excavation. Use temporary paving materials (premix) to feather edges of plates to minimize wheel impact on secured bridging. F Use steel plates of sufficient thickness to support H-20 loading, truck or lane, that produces maximum stress. 3.06 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. B Remove equipment and devices when no longer required. C Repair damage caused by installation. D Remove post settings to a depth of 2 feet. END OF SECTION 03/2008 01555-4 of 4 CITY OF PEARLAND REINFORCED FILTER FABRIC BARRIER Section 01561 REINFORCED FILTER FABRIC BARRIER 1.0 GENERAL 1.01 SECTION INCLUDES A Installation of reinforced filter fabric barrier to control erosion and contain sediments and pollutants in channelized flow areas. B References to Technical Specifications 1 Section 01200—Measurement&Payment Procedures 2. Section 01350—Submittals 3 Section 01566—Source Controls for Erosion& Sedimentation C Referenced Standards. 1 American Society for Testing and Materials (ASTM) a. ASTM D 3786,"Standard Test Method for Hydraulic Bursting strength of Textile Fabrics" b. ASTM D 4632, Standard Test Method for Grab Breaking Load and Elongation of Geotextiles" 1.02 MEASURMENT AND PAYMENT A Measurement for reinforced filter fabric bather is on a linear foot basis between the limits of the beginning and ending fence posts, measured, accepted, and complete in place. B Payment for filter fabric bather will include and be full compensation for all labor, equipment, materials, supervision, and incidental expenses for construction of these items,complete in place,including,but not limited to protection of trees,maintenance requirements, repair and replacement of damaged sections, removal of sediment deposits, and removal of erosion and sediment control systems at the end of construction. C Refer to Section 01200—Measurement&Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Manufacturer's catalog sheets and other product data on geotextile fabric. 05/2008 01561 - 1 of 3 CITY OF PEARLAND REINFORCED FILTER FABRIC BARRIER 2.0 PRODUCTS ` 2.01 FILTER FABRIC A Provide woven or nonwoven geotextile filter fabric made of either polypropylene, polyethylene, ethylene, or polyamide material. B By ASTM - D4632, geotextile fabric shall have a grab strength of 100 psi in any principal direction,a Mullen burst strength exceeding 200psi by ASTM-D3786,and the equivalent opening size between 50 and 140 C Filter fabric shall contain ultraviolet inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 degrees F to 120 degrees F D Representative Manufacturer Mirafi, Inc., or equal. 2.02 FILTER FABRIC REINFORCEMENT A Provide woven galvanized steel wire fence with minimum thickness of 14 gauge and a maximum mesh spacing of 6 inches. B Welded wire shall be galvanized, 2-inch by 4-inch,welded wire fabric, 12 Y2 gauge. 2.03 EXECUTION 2.04 PREPARATION A Provide erosion and sediment control systems at the locations shown on Plans. Such systems shall be of the type indicated and shall be constructed in accordance with the requirements shown on the Plans and specified in this Section. B Erosion and sediment control measures shall be in place prior to the start of any Work that exposes the soil, other than as specifically directed by the Engineer to allow soil testing and surveying. C Regularly inspect and repair or replace damaged components of filter fabric bather Unless otherwise directed,maintain the erosion and sediment control systems until the Work is accepted by the Owner Remove erosion and sediment control systems promptly when directed by the Engineer Discard removed materials in accordance with Section 1562—Waste Material Disposal. D Conduct all construction operations under this Contract m,conformance with the erosion control practices described in Section 01566—Source Controls for Erosion& Sedimentation. 05/2008 01561 -2 of 3 CITY OF PEARLAND REINFORCED FILTER FABRIC BARRIER 2.05 INSTALLATION A Install reinforced filter fabric bathers for erosion and sediment control used during construction and until the fmal development of the Project Site. Reinforced filter fabric bathers are used to retain sedimentation in channelized flow areas. B \ Provide reinforced filter fabric bather in accordance with the Plan detail for Reinforced Filter Fabric Barrier Reinforced filter fabric bather systems shall be installed in such a manner that runoff will percolate through the system and allow sediment to be retained and accumulated. C Trench in the toe of the reinforced filter fabric barrier with a spade or mechanical trencher as shown on the Plans. Lay filter fabric along the edges of the trench. Backfill and compact trench. D Reinforced filter fabric bather shall have a height of 18 inches. E Securely fasten the filter fabric to the wire with tie wires. F Provide the filter fabric in continuous rolls and cut to the length of the fence to minimize the use of joints. When joints are necessary, splice the fabric together only at a support post with a minimum 6-inch overlap and seal securely G Inspect the reinforced filter fabric bather systems after each rainfall, daily during periods of prolonged rainfall, and at a minimum once each week. Repair or replace damaged sections immediately Remove sediment deposits when silt reaches a depth one-third the height of the barrier or 6 inches, whichever is less. END OF SECTION 05/2008 01561 -3 of 3 CITY OF PEARLAND WASTE MATERIAL DISPOSAL Section 01562 WASTE MATERIAL DISPOSAL 1.0 GENERAL 1.01 SECTION INCLUDES A Disposal of waste material and salvageable material. B References to Technical Specifications. 1 Section 01350—Submittals 2. Section 01566—Source Controls for Erosion&Sedimentation 3 Section 01600—Materials &Equipment 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Obtain and submit applicable permits for proposed disposal sites. C Submit a Waste Material Disposal Plan. D Submit a copy of written permission from property owners,along with a description of the property,prior to disposal of excess material adjacent to the Project Site. Submit a written and signed release from property owner upon completion of disposal work. City of Pearland requires individual fill placement permits for all fill placed within the City limits 1.04 WASTE MATERIAL DISPOSAL PLAN A Contractor shall formulate and implement a plan for the collection and disposal of waste materials on the Project Site which includes the following information. 1 Schedule for collection and inspection. 2. Location of trash and waste receptacles. 3 Provisions for liquid waste and potential water pollutants material. B The plan shall comply with applicable federal, state, and local health and safety regulations and Section 01566—Source Controls for Erosion &Sedimentation. 2.0 PRODUCTS - NotUsed 07/2006 01562- 1 of 3 CITY OF PEARLAND WASTE MATERIAL DISPOSAL 3.0 EXECUTION 3.01 SALVAGEABLE MATERIAL A Excavated material. When indicated on Plans, load, haul, and deposit excavated material at a location or locations outside the limits of Project Site. B Base, surface, and bedding material. Deliver gravel, asphaltic, or other base and surfacing material designated for salvage to the location designated by the Engineer C Pipe culvert: Deliver culverts designated for salvage to Owner's storage area. D Other salvageable materials. Conform to requirements of individual Technical Specifications. E Coordinate delivery of salvageable material with Engineer F When temporary, on-site storage of salvaged materials is required, comply with applicable provisions of,Section 01600—Materials &Equipment. 3.02 SEDIMENT DISPOSAL A Remove sediment deposits and dispose of them at the designated spoil site for the Project. If a spoil site is not designated on the Plans, dispose of sediment off site at a location not in or adjacent to a stream or floodplain. B Off-site disposal is the responsibility of the Contractor C Sediment to be placed at the Project Site should be spread evenly throughout the designated area,compacted and stabilized. Sediment shall not be allowed to flush into a stream or drainage way D If sediment has been contaminated,it shall be disposed of in accordance with existing federal, state, and local rules and regulations. 3.03 EXCESS MATERIAL,WASTE,AND EQUIPMENT A Vegetation,rubble,broken concrete,debris,asphaltic concrete pavement,excess soil, and other materials not designated for salvage,shall become the property of Contractor and shall be removed from the Project Site and legally disposed of. B Dispose of removed equipment,materials,waste and debris in a manner conforming to applicable laws and regulations C Excess soil may be deposited on private property adjacent to the Project Site when written permission is obtained from property owner under the provisions of this Section, 1 03D 07/2006 01562-2 of 3 CITY OF PEARLAND WASTE MATERIAL DISPOSAL _ D Verify the flood plain status of any proposed disposal site. Do not dispose-of excavated materials in an area designated as within the 100-year Flood Hazard Area. E Waste materials shall be removed from the site on a daily basis, such that the site is maintained in a neat and orderly condition. F No materials shall be disposed in a manner to damage the Owner in any way END OF SECTION 07/2006 01562-3 of 3 CITY OF PEARLAND TREE AND PLANT PROTECTION Section 01563 'TREE AND PLANT PROTECTION 1.0 GENERAL 1.01 SECTION INCLUDES A Tree and plant protection. References to Technical Specifications. None. 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bidltem,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 PROJECT CONDITIONS A Preserve and protect existing trees and plants to remain from foliage;branch,trunk,or root damage that could result from construction operations. B Prevent following types of damage; 1 Compaction of root zone by foot or vehicular traffic, or material storage. 2. Trunk damage from equipment operations, material storage, or from nailing or bolting. 3 Trunk and branch dainage.caused by ropes or:guy wires or machine impacts. 4 Root poisoning from spilled solvents, gasoline,paint, and other noxious materials. 5 Branch damage due to improper pruning or trimming. 6 Damage from lack of water due to a. Cutting or altering natural:water migration patterns near root zones. b. Failure to provide adequate watering. 7 Damage from alteration of soil pH factor caused by depositing lime, concrete,plaster; or other base:materials near roots. 8. Cutting.feeder of roots or roots.larger than 1-1/2 inches in diameter 1.04 DAMAGE ASSESSMENT A When trees,other than those designated for.removal,are destroyed or badly damaged as a result of construction operations,remove and replace with same size,species,and variety up to and mcluding 8 inches in trunk diameter Trees larger than 8 inches:in diameter shall be replaced with an 8-inch diameter tree of the same species and-variety. and total contract amount will be reduced by an amount determined from the following International Shade Tree Conference formula. 0 7854 x DZ x $10 00 where I? is_ diameter in inches of tree or shrub trunk measured 12 inches above grade. B All necessary tree replacements shall be as approved by Engineer/Urban Forester 02/2013 01563 - 1 of 4 CITY OF PEARLAND TREE AND PLANT PROTECTION 2.0 PRODUCTS 2.01 MATERIALS A Asphalt paint: Emulsified asphalt or other adhesive, elastic, antiseptic coating formulated for horticultural use on cut or injured plant tissue,free from kerosene and coal creosote. B Burlap. Suitable for use as tree wrapping. C Fertilizer Liquid containing 20 percent nitrogen, 10 percent phosphorus, and 5 percent potash. D Temporary Barrier Fence: Plastic, bnght orange color for visibility, 48 inches in height, 8.5 pounds weight minimum. 3.0 EXECUTION 3.01 PROTECTION AND MAINTENANCE OF EXISTING TREES AND SHRUBS A Except for trees and shrubs shown on Plans to be removed,all trees and shrubs within the Project Site area are to remain and be protected from damage. B For designated trees to be removed,perform the following: 1 Stake right-of-way limits and identify any tree of diameter greater than 4 inches which is to be removed. Mark trees prior to felling with an X in orange paint, clearly visible, on the trunk, and at eye level. 2. After marking trees give a minimum of 48-hours notice in writing to the Engineer of intent to begin felling operations. 3 Trees whose trunks are only partially m the right-of-way shall be protected and preserved as described below C For trees or shrubs to remain,perform the following: 1 Trim trees and shrubs only as necessary a. Trees and shrubs requiring prumng for construction should also be pruned for balance as well as to maintain proper form and branching habit. b Cut limbs at branch collar No stubs should remain on trees. Branch cuts should not gouge outer layer of tree structure or trunk. 2. Use extreme care to prevent excessive damage to root systems. a. Roots in construction areas will be cut smoothly with a trencher before excavation begins. Do not allow ripping of roots with a backhoe or other equipment. b Temporarily cover exposed roots with wet burlap to prevent roots from drying out. c. Cover exposed roots with soil as soon as possible. 3 Prevent damage or compaction of root zone (area inside driphne)by construction activities. a. Do not allow scarring of trunks or limbs by equipment or other means. 02/2013 01563 -2 of 4 CITY OF PEARLAND TREE AND PLANT PROTECTION b Do not store construction materials, vehicles, or excavated material mside dripline of trees. c. Do not pour liquid matenals inside driplme. 4 Water and fertilize trees and shrubs that will remain to maintain their health during construction penod. a. Supplemental watering of landscaping dunng construction should be done once a week in months receiving average rainfall and twice a week in months receiving below average rainfall. b This watering shall consist of saturating soils at least 6 to 8 inches beneath surface. 5 Water areas currently being served by private sprinkler systems while systems are temporarily taken out of service to maintain health of existing landscapes. 6 At option of the Contractor and with the Engineer's permission,trees and shrubs to remain may be temporarily transplanted and returned to onginal positions under supervision of professional horticultunst. 3.02 PROTECTIVE CONTROLS A Protection of trees or shrubs in open area. 1 Install steel drive-in fence posts in protective circle, approximately 8 feet on center, at the dripline of the leaf canopy of trees or 2 ft. around shrubs. 2. Dnve steel drive-in fence posts 3 feet minimum into ground, leavmg 5 feet minimum above ground. 3 For trees or shrubs in paved areas,use moveable posts constructed from concrete-filled steel pipe 2-1/2 inches minimum in diameter mounted in rubber auto tires filled with concrete. 4 Mount plastic temporary barrier safety fence on posts. B Timber-wrap protection for trees in close proximity of moving or mechanical equipment and construction work: 1 Wrap trunk with layer of burlap. 2. Install 2 x 4's or 2 x 6's(5-foot to 6-foot lengths)vertically, spaced 3 inches to 5 inches apart around circumference of tree trunk. 3 Tie in place with 12 to 9 gage steel wire. 3.03 MAINTENANCE OF NEWLY PLANTED TREES A Water newly planted trees adequately to maintain and support healthy plants at the time of planting. B The Contractor guarantees that trees planted for this Work shall remain alive and healthy at least until the end of a one-year warranty period. 1 Within four weeks of notice from Owner, Contractor shall replace, at his expense, any dead trees or any trees that in the opinion of Owner, have become unhealthy or unsightly or have lost their natural shape as a result of additional growth, improper pruning or maintenance, or weather conditions. 02/2013 01563 -3 of 4 CITY OF PEARLAND TREE AND PLANT PROTECTION 2. When tree must be replaced,the guarantee period for that tree shall begin on date of replacement of tree, subject to.the Owner's inspection, for no less than one year 3 Straighten leaning trees and bear entire cost. 4 Dispose of trees rejected at any time by Engineer at Contractor's expense. END OF SECTION 02/2013 01563 -4 of 4 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER Section 01564 CONTROL OF GROUND WATER AND SURFACE WATER 1.0 GENERAL 1.01 SECTION INCLUDES A Dewatering,depressurizing,draining,and maintaining trench and structure excavations and foundation beds in dry and stable condition. B Protecting work against surface runoff and rising flood waters. C Disposing of removed water D References to Technical Specifications. 1 Section 01200—Measurement&Payment Procedures 2. Section 01350—Submittals 3 Section 01570—Trench Safety Systems 4 Section 01565—TPDES Requirements 5 Section 01566—Source Controls for Erosion&.Sedimentation E Referenced Standards. 1 Occupational Safety and Health Administration(OSHA) 2. Texas Commission on Environmental Quality(TCEQ) 3 Code of Ordinances, City of Pearland, Texas 4 Water Well Drillers and Pump Installers Advisory Council (WWD/PI) F Definitions. 1 Ground Water Control Systems -installations external to the excavation such as well points, eductors, or deep wells. Ground water control includes dewatering and depressurization. a. Dewatering-lowering the water table and intercepting seepage which would otherwise emerge from slopes or bottoms of excavations and disposing of removed water The intent of dewatering is to increase stability of excavated slopes, prevent dislocation of material from slopes or bottoms of excavations,reduce lateral loads on sheeting and bracing; improve excavating and hauling characteristics of excavated material,prevent failure or heaving of the bottom of excavations, and to provide suitable conditions for placement of backfill materials and construction of structures and other installations. b Depressurization-reduction in piezometric pressure within strata not controlled by dewatering alone, as required to prevent failure or heaving of excavation bottom. 2. Surface Water Control- diversion and drainage of surface water runoff and rain water away from the excavation. 3 Excavation Drainage-keeping excavations free of surface and seepage water 02/2008 01564- 1 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER 1.02 MEASUREMENT AND PAYMENT A Measurement for and control of ground water for open cut pipe excavations shall be on a linear foot basis and shall not exceed the length of open cut pipe installation in the area requiring ground water control. B Unless indicated as a Bid Item,no separate payment will be made for control of ground water for any condition(s) other than those described in this Section, 1 02A. No separate payment will be made for control of surface water Include the cost to control non-pipe excavation ground water and surface water in price for Work requiring such controls. C Refer to Section 01200—Measurement&Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit a Ground Water and Surface Water Control Plan for review by the Engineer prior to start of any field work. The plan shall be signed by a Professional Engineer registered in the State of Texas. The plan shall include the following: 1 Results of subsurface investigation and description of the extent and characteristics of water bearing layers subject to ground water control. 2. Names of equipment suppliers and installation subcontractors. 3 A description of proposed ground water control systems indicating arrangement,location, depth and capacities of system components, installation details and criteria, and operation and maintenance procedures. 4 A description of proposed monitoring and control system indicating depths and locations of piezometers and monitoring wells,monitoring installation details and criteria, type of equipment and instrumentation with pertinent data and characteristics. 5 A description of proposed filters including types, sizes, capacities and manufacturer's application recommendations. 6. Design calculations demonstrating adequacy of proposed systems for intended applications. Define potential area of influence of ground water control operation near contaminated areas. 7 Operating requirements, including piezometric control elevations for dewatering and depressurization. 8. Excavation drainage methods including typical drainage layers, sump pump application and other necessary means. 9 Surface water control and drainage installations. 10. Proposed methods and locations for disposing of removed water C Submit the following records upon completed initial installation. 1 Installation and development reports for well points, eductors, and deep wells. 02/2008 01564-2 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER 2. Installation reports and baseline readings for piezometers and monitoring wells. 3 Baseline analytical test data of water from monitoring wells. 4 Initial flow rates. Submit the following records on a weekly basis during operations 1 Records of flow rates and piezometric elevations obtained during monitoring of dewatering and depressurization. Refer to this Section, 3 02 "Requirements for Eductor,Well Points, or Deep Wells" 2. Maintenance records for ground water control installations,piezometers, and monitoring wells. E Submit the following records at end of the Work. Decommissioning(abandonment) reports for monitoring wells and piezometers installed by other during the design phase and left for Contractor's monitoring and use. 1.04 PERFORMANCE REQUIREMENTS A Conduct subsurface investigations to identify groundwater conditions and to provide parameters for design, installation, and operation of groundwater control systems. B Design a ground water control system, compatible with the requirements of OSHA Standards - 29 CFR, Part 1926, and Section 01570-Trench Safety Systems of these Technical Specifications, to produce the following results 1 Effectively reduce the hydrostatic pressure affecting excavations. 2. Develop a.substantially dry and stable subgrade for subsequent construction operations. 3 Preclude damage to adjacent properties,buildings, structures,utilities, - installed facilities, and other work. 4 Prevent the loss of fines, seepage,boils, quick condition, or softening of the foundation strata. 5 Maintain stability of sides and bottom of excavations. C Ground water control systems may include single-stage or multiple-stage well point systems, eductor and ejector-type systems, deep wells, or combinations of these equipment types. D Provide drainage of seepage water and surface water,as well as water from any other source entering the excavation. Excavation drainage may include placement of drainage materials, such as crushed stone and filter fabnc, together with sump pumping. E Provide ditches,berms,pumps and other methods necessary to divert and drain surface water from excavation and other work areas. F Locate ground water control and drainage systems so as not to interfere with utilities, construction operations, adjacent properties, or adjacent water wells. 02/2008 01564-3 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER G Assume sole responsibility for ground water control systems and for any loss or damage resulting from partial or complete failure of protective measures and any settlement or resultant damage caused by the ground water control operations. Modify ground water control systems or operations if they cause or threaten to cause damage to new construction, existing site improvements, adjacent property, or adjacent water wells,or affect potentially contaminated areas. Repair damage caused by ground water control systems or resulting from failure of the system to protect property as required. H Provide an adequate number of piezometers installed at the proper locations and depths as required to provide meaningful observations of the conditions affecting the excavation, adjacent structures, and water wells. I Provide environmental monitoring wells installed at the proper locations and depths as required to provide adequate observations of hydrostatic conditions and possible contaminant transport from contamination sources into the work area or into the ground water control system. J Decommission piezometers and monitoring wells installed during design phase studies and left for Contractors monitoring and use. 1.05 ENVIRONMENTAL REQUIREMENTS A Comply with requirements of agencies having jurisdiction. B Comply with TCEQ regulations and WWD/PI Advisory Council for development, drilling, and abandonment of wells used in dewatering system. C Obtain permit from TCEQ under the Texas Pollutant Discharge Elimination System (TPDES),for storm water discharge from construction sites. Refer to Section 01565— TPDES, 3.02 "Certification Requirements" D Obtain all necessary permits from agencies with control over the use of groundwater and matters affecting well installation, water discharge, and use of existing storm drains and natural water sources. Because the review and permitting process may be lengthy, take early action to pursue and submit for the required approvals. E Monitor ground water discharge for contamination while performing pumping in the vicinity of potentially contaminated sites. F Implement control of ground and surface water under the provisions of Section 01566 —Source Controls for Erosion & Sedimentation. 2.0 PRODUCTS 2.01 EQUIPMENT AND MATERIALS A Equipment and materials are at the option of Contractor as necessary to achieve desired results for dewatering. Selected equipment and materials are subject to review 02/2008 01564-4 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER of the Engineer through Submittals required in Section 01350 — Submittals, 1 06 "Operations and Maintenance Data" B Eductors, well points, or deep wells, where used, must be furnished, installed and operated by an experienced contractor regularly engaged in ground water control system design, installation, and operation. C Equipment and instrumentation for monitoring and control of the ground water control system includes piezometers and monitoring wells, and devices, such as flow meters, for observing and recording flow rates. D All equipment must be in good repair and operating order E Sufficient standby equipment and materials shall be kept available to ensure continuous operation, where required. 3.0 EXECUTION 3.01 GROUND WATER CONTROL A Perform a subsurface investigation by borings as necessary to identify water bearing layers,piezometric pressures,and soil parameters for design and installation of ground water control systems. Perform pump tests,if necessary to determine the drawdown characteristics of the water-bearing layers. The results shall be presented in the Ground Water and Surface Water Control Plan. Refer to this Section, 1 03B B Provide labor, material, equipment, techniques and methods to lower, control and handle ground water in a manner compatible with construction methods and site conditions. Monitor effectiveness of the installed system and its effect on adjacent property C Install, operate, and maintain ground water control systems in accordance with the Plan. Notify Engineer in writing of any changes made to accommodate field conditions and changes to the Work. Provide revised drawings and calculations with such notification. D Provide for continuous system operation, including nights, weekends, and holidays. Arrange for appropriate backup if electrical power is primary energy source for dewatering system. E Monitor operations to verify that the system lowers ground water piezometric levels at a rate required to maintain a dry excavation resulting in a stable subgrade for prosecution of subsequent operations. F Where hydrostatic pressures in confined water bearing layers exist below excavation, depressurize those zones to eliminate risk of uplift or other instability of excavation or installed works. Allowable piezometric elevations shall be defined in the Plan. 02/2008 01564-5 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER G Maintain water level below subgrade elevation. Do not allow levels to rise until foundation concrete has achieved design strength. H During backfilling,dewatering may be reduced to maintain water level a minimum of 5 feet below prevailing level of backfill. However, do not allow that water level to result in uplift pressures in excess of 80 percent of downward pressure produced by weight of structure or backfill in place. Do not allow water levels to rise into cement stabilized sand until at least 48 hour after placement. I Provide a uniform diameter for each pipe drain run constructed for dewatering. Remove pipe drain when it has served its purpose. If removal of pipe is impractical, provide grout connections at 50-foot intervals and fill pipe with cement-bentonite grout or cement-sand grout when pipe is removed from service. J Extent of construction ground water control for structures with a permanent perforated underground drainage system may be reduced,such as for units designed to withstand hydrostatic uplift pressure. Provide a means of draining the affected portion of underground system,including standby equipment. Maintain drainage system during operations and remove it when no longer required. K Remove system upon completion of construction or when dewatering and control of surface or ground water is no longer required. L Compact backfill as required by the Contract Documents. 3.02 REQUIREMENTS FOR EDUCTOR,WELL POINTS,OR DEEP WELLS A For aboveground piping in ground water control system,include a 12-inch minimum length of clear, transparent piping between every eductor well or well point and discharge header so that discharge from each installation can be visually monitored. B Install sufficient piezometers or monitoring wells to show that all trench or shaft excavations in water bearing matenals are predrained pnor to excavation. Provide separate piezometers for monitoring of dewatering and for monitoring of depressurization. Install piezometers and monitoring wells for tunneling as appropriate for Contractor's selected method of work. C Install piezometers or monitoring wells not less than one week in advance of beginning the associated excavation. D Dewatering may be omitted for portions of underdrains or other excavations,but only where auger borings and piezometers or monitoring wells show that soil is'predrained by an existing system such that the criteria of the Ground Water and Surface Water Control Plan are satisfied. 02/2008 01564-6 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER E Replace installations that produce noticeable amounts of sediments after development. F Provide additional ground water control installations or change the methods in the event that the installations according to the Ground Water and Surface Water Control Plan do not provide satisfactory results based on the performance criteria defined by the Plan and by this Section. Submit a revised Plan according to this Section, 1.03A. G Mechanical dewatering equipment shall comply with Chapter 19 NOISE, Code of Ordinances, City of Pearland, Texas. 3.03 EXCAVATION DRAINAGE A Contractor may use excavation drainage methods if necessary to achieve well drained, stable trench conditions. The excavation drainage may consist of the following methods or combination of methods. 1 Sump pumping in combination with. a. Layer of crushed stone and filter fabric. b Sand and gravel drains. 2. Wells for ground water control. B Use sump pumping and a drainage layer, as defined in ASTM D 2321,placed on the foundation beneath pipe bedding or thickened bedding layer of Class I material. 3.04 MAINTENANCE AND OBSERVATION A Conduct daily maintenance and observation of piezometers or monitoring wells while the ground water control installations or excavation drainage are operating in an area. Keep system in good operating condition. B Replace damaged and destroyed piezometers or monitoring wells with new piezometers or wells as necessary to meet observation schedule. C Cut off piezometers or monitoring wells in excavation areas where piping is exposed, only as necessary to perform observation as excavation proceeds. Continue to maintain and make observations, as specified. D Remove and grout piezometers inside or outside the excavation area when ground water control operations are complete. Remove and grout monitoring wells when directed by the Engineer 3.05 MONITORING AND RECORDING A Monitor and record average flow rate of operation for each deep well, or for each wellpoint or eductor header used in dewatering system. Also monitor and record water level and ground water recovery These records shall be obtained daily until steady conditions are achieved, and twice weekly thereafter 02/2008 01564-7 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER B Observe and record elevation of water level daily as long as ground water control system is in operation, and weekly thereafter until the Work is completed or piezometers or wells are removed, except when Engineer determines that more frequent monitoring and recording are required. Comply with Engineer's direction for increased monitoring and recording and take measures as necessary to ensure effective dewatering for intended purpose. 3.06 SURFACE WATER CONTROL A Intercept surface water and divert it away from excavations through use of,dikes, ditches,curb walls,pipes,sumps or other approved means. The requirement includes temporary works required to protect adjoining properties from surface drainage caused by construction operations. B Divert surface water and seepage water into sumps and pump it into drainage channels or storm drains, when approved by agencies having jurisdiction. Provide settling basins when required by such agencies. C Provide additional surface water control measures or change the methods in the event that the measures according to the Ground Water and Surface Water Control Plan do not provide satisfactory results based on the performance criteria defined by the Plan and by this Section. Submit a revised Plan according to this Section, 1 03B END OF SECTION 02/2008 01564-8 of 8 CITY OF PEARLAND TPDES REQUIREMENTS Section 01565 TPDES REQUIREMENTS 1.0 GENERAL A DEFINITIONS As used herein and in conjunction with TPDES General Permit No. TXR150000, the term OPERATOR refers to the CONTRACTOR. LO1 SECTION INCLUDES A Descnption of the required documentation to be prepared signed and submitted by the Contractor before conducting construction operations, in.accordance with the terms and conditions of the Texas 'Pollutant Discharge Elimination System (TPDES) General Permit TXR150000 as issued March 5, 2003, re-issued March 5, 2013,by the Texas Commission on Environmental Quality under the provisions.of Section 402 of the Clean Water Act and.Section 26.040 of the Texas Water Code. ,B Contractor's responsibility for implementation, maintenance, and. inspection of , storm water pollution prevention control measures including; but not limited to,. erosion: and sediment controls, storm water management plans, waste collection and disposal, Off-site vehicle tracking, and other practices shown on the Plans or specified elsewhere in this or other Technical Specifications. This Specification provides guidelines and Best Management Practices (BMP's) information for the Contractor to use in adhenng to all local, state- and federal environmental regulations with respect to storm water pollution prevention during construction activity C References to Techmcal Specifications 1 :Section 01350—Submittals 2. Section 0131.0.—Coordination&.Meetings 3 Section 01770—Contract Closeout D Referenced Standards 1 Texas Commission on Environmental'Quality.(TCEQ) E Other References. 1 Storm Water Pollution Prevention Plan(SWPPP) found m Appendix A of these Technical Specifications. 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item; no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 04-2013 01565- 1 of 4 CITY OF PEARLAND TPDES REQUIREMENTS 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. , 2.0 PRODUCTS - Not Used 3.0 EXECUTION 3.01 REQUIRED NOTICES A The Contractor shall complete, sign, and date the Contractor's Notice of Intent (NOI) attached in Appendix A. The Contractor's NOI shall be submitted to the TCEQ It is the Contractor's responsibility to pay for any fees associated with the permit. Submission of the NOI is required by the Contractor before construction operations begin. B Upon completion of construction and acceptance of the Work by the Owner, the Contractor shall complete, sign, date and submit the Contractor's Notice of Termination(NOT) attached in Appendix A. 3.02 CERTIFICATION REQUIREMENTS A On the Operator's Information form attached in Appendix A, the Contractor shall complete name, address, and telephone number for the Contractor; the names of persons or firms responsible for maintenance and inspection of erosion and sediment control measures and all Subcontractors B The Contractor and Subcontractors named in the Contractor's Information form shall read, sign, and date the Contractor's/Subcontractor's Certification form, attached m Appendix A. C The persons or firms responsible for maintenance and inspection of erosion and sediment control measures shall read, sign, and date the Contractor's Inspection and Maintenance Certification form, attached in Appendix A. D The Contractor's Information form and all certification forms shall be submitted to the Owner before begmning construction. E Contractor shall review implementation of the SWPPP in a meetmg with the Owner and Engineer prior to start of construction in accordance with Section 01310 — Coordmation &Meetings. 3.03 RETENTION OF RECORDS A The Contractor shall keep a copy of the SWPPP at the Project Site or at the Contractor's office from the date that it became effective to the date the Work is accepted by the Owner B At Contract Closeout, the Contractor shall submit to the Owner all TPDES forms and certifications, as well as a copy of the SWPPP, in accordance with Section 04-2013 01565-2 of 4 CITY OF PEARLAND TPDES REQUIREMENTS 01770 — Contract Closeout. The SWPPP records and data will be retained by Owner for a penod of 3 years from the date the Work is accepted by the Owner 3.04 POSTING OF NOTICES A The following notices shall be posted from the date that this SWPPP goes into effect until the date the Work is accepted by the Owner 1 Copies of the Notices of Intent submitted by the Contractor and a bnef Description of Construction Activity being conducted at the Project Site, as given in Article 1 of the SWPPP, shall be posted at the Project Site or at Contractor's office in a prominent place for public viewmg. 2. Notice to dnvers of equipment and vehicles, instructing them to stop, check, and clean tires of debris and mud before driving onto traffic lanes. Post such notices at every stabilized construction exit area. 3 In an easily visible location on Project Site,post a notice of waste disposal procedures. 4 Notice of hazardous matenal handling and emergency procedures shall be posted with the NOI on Project Site. Keep copies of Material Safety Data Sheets at a location on Project Site that is known to all personnel. 5 Keep a copy of each signed certification at the Project Site or at Contractor's office. APPENDIX A FOLLOWS THIS SECTION END OF SECTION 04-2013 01565-3 of 4 CITY OF PEARLAND TPDES REQUIREMENTS Section 01565 TPDES REQUIREMENTS (APPENDIX A) TABLE OF CONTENTS TCEQ General Permit NOI TCEQ Form-.20022 TCEQ Form-20134 NOC TCEQ Form-20391 NOT TCEQ.Form- 20023 Site Notice Forms 04-2013 01565-4 of 4 Texas Commission on Environmental Quality P 0 Box 1.3o87,Austin,Texas 78711-3o87 �`tg:P-.OFT GENERAL PERMIT TO DISCHARGE UNDER THE TEXAS POLLUTANT DISCHARGE ELIMINATION SYSTEM under provisions of Section 402 of the Clean Water Act and Chapter 26 of the Texas Water Code This permit supersedes and replaces TPDES General Permit No.TXRi50000,issued March 5,2008 Construction sites that discharge stormwater associated with construction activity located in.the state of Texas may discharge to surface water in the state only according to monitoring requirements and other conditions set forth in this general permit,as well as the rules of the Texas Commission on Environmental Quality(TCEQ or Commission),the laws of the State of Texas,and other orders of the Commission of the TCEQ. The issuance of this general permit does not grant to the permittee the right to use private or public property for conveyance of storrnwater and certain non-stormwater discharges along the discharge route. This includes property belonging to but not limited to any individual,partnership,corporation or other entity Neither does this general permit authorize any invasion of personal rights nor any violation of federal,state,or local laws or regulations. It is the respoixsibility of the permittee to acquire property rights as may be necessary to use the discharge route. This general permit and the authorization contained herein shall expire at midnight,five years from the permit effective date. EFFECTIVE DATE. March 5, 2013 ISSUED DATE. F E B i 9 2013 For C mission Construction General Permit TPDES General Permit TXR150000 TPDES GENERAL PERMIT NUMBER TXRi50000 RELATING TO STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES Table of Contents Part I. Flow Chart and Definitions 5 Section A. Flow Chart to Determine Whether Coverage is Required 5 Section B. Definitions 6 Part II. Permit Applicability and Coverage 12 Section A. Discharges Eligible for Authorization 12 1. Stormwater Associated with Construction Activity 12 2. Discharges of Stormwater Associated with Construction Support Activities 12 3. Non-Stormwater Discharges 12 4. Other Permitted Discharges 13 Section B. Concrete Truck Wash Out 13 Section C. Limitations on Permit Coverage 13 1. Post Construction Discharges. 13 2. Prohibition of Non-Stormwater Discharges 13 3. Compliance With Water Quality Standards 13 4. Impaired Receiving Waters and Total Maximum Daily Load(TMDL) Requirements. 14 5. Discharges to the Edwards Aquifer Recharge or Contributing Zone 14 6. Discharges to Specific Watersheds and Water Quality Areas 14 7 Protection of Streams and Watersheds by Other Governmental Entities 14 8. Indian Country Lands 14 9. Oil and Gas Production. 15 10. Stormwater Discharges from Agricultural Activities. 15 11. Endangered Species Act. 15 12. Other 15 Section D Deadlines for Obtaining Authorization to Discharge 15 1. Large Construction Activities 15 2. Small Construction Activities 15 Section E. Obtaining Authorization to Discharge 16 1. Automatic Authorization for Small Construction Activities With Low Potential for Erosion. 16 2. Automatic Authorization For All Other Small Construction Activities: 17 3. Authorization for Large Construction Activities. 17 Page 2 Construction General Permit TPDES General Permit TXR150000 4. Waivers for Small Construction Activities. 18 5. Effective Date of Coverage 18 6. Notice of Change(NOC) 18 7 Signatory Requirement for NOI Forms,Notice of Termination(NOT)Forms,NOC Letters,and Construction Site Notices 19 8. Contents of the NOI 19 Section F Terminating Coverage .20 1. Notice of Termination(NOT)Required .20 2. Minimum Contents of the NOT .20 3. Termination of Coverage for Small Construction Sites and for Secondary Operators at Large Construction Sites .20 4. Transfer of Operational Control 21 Section G Waivers from Coverage 21 1. Waiver Applicability and Coverage. .22 2. Steps to Obtaining a Waiver .22 3. Effective Date of Waiver .22 4. Activities Extending Beyond the Waiver Period. .22 Section H. Alternative TPDES Permit Coverage. .23 1. Individual Permit Alternative .23 2. Individual Permit Required .23 3. Alternative Discharge Authorization .23 Section I. Permit Expiration. .23 Part III. Stormwater Pollution Prevention Plans(SWP3) .244 Section A. Shared SWP3 Development .24 Section B. Responsibilities of Operators 25 1. Secondary Operators and Primary Operators with Control Over Construction Plans and Specifications 25 2. Primary Operators with Day-to-Day Operational Control 25 Section C. Deadlines for SWP3 Preparation,Implementation,and Compliance 25 Section D Plan Review and Making Plans Available 26 Section E. Revisions and Updates to SWP3s .26 Section F Contents of SWP3 .26 Section G Erosion and Sediment Control Requirements Applicable to All Sites. 34 Part IV Stormwater Runoff from Concrete Batch Plants 35 Section A. Benchmark Sampling Requirements 35 Section B. Best Management Practices(BMPs)and SWP3 Requirements 37 Section C. Prohibition of Wastewater Discharges. .39 Page 3 Construction General Permit TPDES General Permit TXR150oo0 Part V Concrete Truck Wash Out Requirements 40 Part VI. Retention of Records 40 Part VII.Standard Permit Conditions 40 Part VIII. Fees 41 Appendix A. Automatic Authorization .43 Appendix B. Erosivity Index(EI)Zones in Texas .45 Appendix C: Isoerodent Map .46 Appendix D. Erosivity Indices for EI Zones in Texas 47 Page 4 Construction General Permit TPDES General Permit TXR150000 Part I. FlOw Chart and Definitions Section A.. Flow Chart to Determine Whether Coverage is.Regnired How flinch land will be.disturbed?el) <1 acre 1 or more acres • NO Do you meet the yEs Wiii 5 or more •• • . definition•of • acres be disturbed? • "operator?"4*2) :(#l) • • 4'0 r S • .. . i -s•, Permit Coverage Required • Prepare.and Implement SWP3 • • Post Site Notice • Submit Copy of She Notice to MS4 Operator Are you a"primary NO NO (. . . . .. . Permit.Coverage Not US Required,Unless.Part:• ( Permit Coverage.Required of a Larger Common • Prepare and Implement.SWP3 Plan of.l)cvelopment • Submit NOl to TCEQ or Sale • Post Site Notice .1 : • Submit Copy of NQ!to MS4 •` .Operator (*1) To determine the size of the construction project,use the size of the entire area to be disturbed,and include the"size of the larger common plan of development or sate,.if the project is part of d'larger project(refer to Part 113., "Definitions,"for an explanation of"common plan.of developnient or sale'.'). (*2) .Refer.:to the definitions for"operator,"`primary.operator,"and"secondary operator"in Part I., Section B.of this pernnii Page 5 Construction General Permit TPDES General Permit TXR150000 Section B. Definitions Arid Areas.-Areas with an average annual rainfall Onto io inches. Best Management Practices(BMPs)-Schedules of activities,prohibitions of practices, maintenance procedures,structural controls,local ordinances,and other management practices to prevent or reduce the discharge of p pollutants. BMPs also include treatment requirements,operating procedures, and practices to control construction site runoff,spills or leaks,waste disposal,ordrainage from raw material storage areas. Commencement of Construction-The initial disturbance of soils associated with clearing,grading,or excavation activities,as well as other construction-related activities (e.g.,stockpiling of fill material,demolition). Common Plan of Development-:A construction activity that is completed.in:separate stages,separate phases,.or in combination with other construction activities. A common plan of.development(also known as a"common plan of development or sale")is identified by the documentation.forthe construction project that identifies the scope.of the.project, and may include plats,blueprints,marketing plans,contracts,building permits,a public notice cm-hearing,zoning requests,or.other similar documentation and activities. A common plan of development does not necessarily include.all construction projects within the jurisdiction of a public entity(e.g.,a city or university). Construction of roads or buildings in different parts of the jurisdiction would be considered separate"common plans,"with only the interconnected parts of a project being considered part of a"common plan"(e.g.,abuilding and its:associated parking lot and driveways,airport runway and associated taxiways,a building complex,etc.). Where discrete construction projects occur within a larger common plan of development or sale but are located 1/4 mile or more apart,and the area between the projects is not being disturbed,each individual project can be treated as a separate plan of. development or sale,provided that any interconnecting road,pipeline:or utility project that is-part of the same"common plan"is not.included in the area to be disturbed. Construction.Activity-Includes soildisturbance activities,.including clearing,grading, and excavating; and does not include routine maintenance that is performed to maintain.the original line and grade,hydraulic capacity,or original purpose of the site(e.g.,the routine :grading of existing dirt roads,asphalt overlays of existingroads,the routine clearing of existing right-of-ways;and similar maintenance activities).Regulated construction activity is defined in terms of small and large construction activity -Dewatering:—The act of'draining rainwater or groundwater from building foundations, vaults,and trenches. Discharge—For the purposes of this permit,the:drainage,release,or disposal of pollutants in.stormwater and certain non-stormwater from areas.where.soil disturbing activities(e.g., clearing,grading,.excavation,stockpiling of fill material,and demolition),construction materials or.equipment storage or maintenance(e.g.,fill piles,borrow area,concrete truck wash out,fueling),or other industrial stormwaterdirectly related to the construction process .(e.g.,concrete or asphalt batch plants)are.located. Drought-Stricken Area—For the purposes of this permit,.an area in which:the National Oceanic and Atmospheric Administration's U.S.Seasonal Drought Outlook indicates for the period during which the construction will occur.that any of the following.conditions are likely. (1)"Droughtto persist or intensify"; (2)"Drought ongoing,some improvement", (3) "Drought likely to improve,impacts ease";.or(4)"Drought development likely" -See http.//www:cpc.ncep.noaa.gov/products/expert assessment/seasonal drought.html. Edwards Aquifer-As defined under Texas Administrative Code(TAC)§213.3 of this title (relating to the Edwards Aquifer),that portion of an arcuate belt of porous,water-bearing, predominantly carbonate rocks known as the Edwards and Associated Limestones in the Balcones Fault Zone trending:from west to east to:northeast in Kinney,Uvalde,Medina, Bexar,Corral,Hays,Travis,and Williamson Counties;.and composed of the Salmon Peak Page 6 Construction General Permit TPDES General Permit TXR15oo0o Limestone,McKnight Formation,West Nueces Formation,Devil's River Limestone,Person Formation,Kainer Formation,Edwards Formation,and.Georgetown Formation. The permeable aquifer units generally overlie the less permeable Glen Rose Formation to the south,.overlie the less-permeable Comanche Peak.and Walnut Formations north of the Colorado River,and underlie the less-permeable Del Rio Clay regionally Edwards Aquifer Recharge Zone-Generally,that area where the.stratigraphic units constituting the Edwards Aquifer crop out,including the outcrops of other geologic formations in:proximity to the Edwards.Aquifer,where caves,sinkholes,faults,fractures,or other permeable features would create a potential for recharge of surface waters.into the Edwards Aquifer The recharge zone is identified as that area designated as such on official maps located in the offices of the Texas Commission on Environmental Quality(TCEQ)and the appropriate regional office. The Edwards Aquifer Map Viewer,located at http.//www.tceq:texas.gov/compliance/field ops/eapp/mapdisclaimer.html,can be used to determine where the recharge zone is located. Edwards Aquifer Contributing Zone-The area or watershed where runoff from precipitation flows downgradient to the recharge zone of.the:Edwards Aquifer. The contributing zone is located upstream(upgradient).and generally north and northwest of the recharge zone for the following counties. all areas within Kinney County,except the area. within the watershed draining to Segment.No.2304 of the Rio Grande Basin,all areas within Uvalde,Medina,Bexar,and Coma].Counties; all areas within Hays and Travis:Counties, except the area within the watersheds draining to the Colorado River above a point 1.3 miles upstream from Tom MillerDam,Lake Austin at the confluence of Barrow Brook Cove, Segment No.1403 of the Colorado River Basin, and all areas.within Williamson.County, except the area within the watersheds:draining to the Lampasas River above the dam at Stillhouse Hollow reservoir,Segment No.r216.of the Brazos River Basin.The contributing. zone is illustrated on the Edwards Aquifer map:viewer at http://www:tceq.texas.gov/compliance/field ops/eapp/mapdisclaimer:html. Effluent Limitations Guideline(ELG)—Defined in 4o Code of Federal Regulations (CFR) §122.2 as a regulation published by the Administrator under.§3o4(b)of the Clean Water Act(CWA)to adopt or revise effluent limitations. Facility or Activity—For the purpose of this permit,a.construction site or construction support activity that is regulated under this general permit,including all contiguous land and fixtures(for example,ponds and materials stockpiles),structures,or appurtances used at a construction site or industrial site.describedbythis general permit. Final Stabilization A construction site status where any of the following conditions are met: A. All soil disturbing'activities at the site have been completed and a uniform(that is,evenly distributed,without large bare areas)perennial vegetative_cover with a density of at least 7o%of the native background vegetative cover for the area has been established on all unpaved.areas and areas not covered by permanent structures,'or equivalent permanent stabilization measures(such as the use of riprap,gabions,or geotextiles)have been employed. B. Forindividual lots in a residential construction site by either (1) the homebuilder completing final stabilization'as specified in condition(a)above; or (2) the homebuilder establishing temporary stabilization for an individual lot prior to the time of transfer of the ownership of the home to the buyer and after informing the homeowner of the need for,and:benefits of,final stabilization.If temporary stabilization is not feasible,then the homebuilder may fulfill this requirement by retaining perimeter controls or BMPs,and informing the.hoineowner of the need for removal of temporary controls and the establishment of final stabilization. Page Construction General Permit TPDES General Permit TXR150000 Fulfillment of this requirement must be documented in the homebuilder's stormwater pollution prevention plan(SWP3). C. For construction activities on land used for agricultural purposes(such as pipelines across crop or range land),final stabilization may be accomplished by returning the disturbed land to its preconstruction agricultural use. Areas disturbed that were not previously used for agricultural activities,such as buffer strips immediately adjacent to surface water and areas that are not being returned to their preconstruction agricultural use must meet the final stabilization conditions of condition(a)above. D In arid,semi-arid,and drought-stricken areas only,all soil disturbing activities at the site have been completed and both of the following criteria have been met: (i) Temporary erosion control measures(for example,degradable rolled erosion control product)are selected,designed,and installed along with an appropriate seed base to provide erosion control for at least three years without active maintenance by the operator,and (2) The temporary erosion control measures are selected,designed,and installed to achieve 7o%of the native background vegetative coverage within three years. Hyperchlorination of Waterlines—Treatment of potable water lines or tanks with chlorine for disinfection purposes,typically following repair or partial replacement of the waterline or tank,and subsequently flushing the contents. Impaired Water-A surface water body that is identified on the latest approved CWA §3o3(d)List as not meeting applicable state water quality standards.Impaired waters include waters with approved or established total maximum daily loads(TMDLs),and those where a TMDL has been proposed by TCEQ but has not yet been approved or established. Indian Country Land—(from 40 CFR§122.2)(1)all land within the limits of any Indian reservation under the jurisdiction of the United States government,notwithstanding the issuance of any patent,and,including rights-of-way running through the reservation, (2)all dependent Indian communities with the borders of the United States whether within the originally or subsequently acquired territory thereof,and whether within or without the limits of a state;and(3)all Indian allotments,the Indian titles to which have not been extinguished,including rights-of-way running through the same. Indian Tribe-(from 40 CFR§122.2)any Indian Tribe,band,group,or community recognized by the Secretary of the Interior and exercising governmental authority over a Federal Indian Reservation. Large Construction Activity-Construction activities including clearing,grading,and excavating that result in land disturbance of equal to or greater than five(5)acres of land. Large construction activity also includes the disturbance of less than five(5)acres of total land area that is part of a larger common plan of development or sale if the larger common plan will ultimately disturb equal to or greater than five(5)acres of land. Large construction activity does not include routine maintenance that is performed to maintain the original line and grade,hydraulic capacity,or original purpose of the site(for example,the routine grading of existing dirt roads,asphalt overlays of existing roads,the routine clearing of existing right-of-ways,and similar maintenance activities.) Linear Project—Includes the construction of roads,bridges,conduits,substructures, pipelines,sewer lines,towers,poles,cables,wires,connectors,switching,regulating and transforming equipment and associated ancillary facilities in a long,narrow area. Minimize-To reduce or eliminate to the extent achievable using stormwater controls that are technologically available and economically practicable and achievable in light of best industry practices. Page 8 Construction General Permit TPDES General Permit TXRi50000 Municipal Separate Storm Sewer System(MS4)-A separate storm sewer system owned or operated by the United States,a state,city,town,county,district,association,or other public body(created by or pursuant to state law)having jurisdiction over the disposal of sewage,industrial wastes,stormwater,or other wastes,including special districts under state law such as a sewer district,flood control or drainage district,or similar entity,or an Indian tribe or an authorized Indian tribal organization,that discharges to surface water in the state. Notice of Change(NOC) —Written notification to the executive director from a discharger authorized under this permit,providing changes to information that was previously provided to the agency in a notice of intent form. Notice of Intent(NOI)-A written submission to the executive director from an applicant requesting coverage under this general permit. Notice of Termination(NOT)-A written submission to the executive director from a discharger authorized under a general permit requesting termination of coverage. Operator-The person or persons associated with a large or small construction activity that is either a primary or secondary operator as defined below. Primary Operator—the person or persons associated with a large or small construction activity that meets either of the following two criteria. (a) the person or persons have on-site operational control over construction plans and specifications,including the ability to make modifications to those plans and specifications,or (b) the person or persons have day-to-day operational control of those activities at a construction site that are necessary to ensure compliance with a Storm Water Pollution Prevention Plan(SWP3)for the site or other permit conditions(for example,they are authorized to direct workers at a site to carry out activities required by the SWP3 or comply with other permit conditions). Secondary Operator—The person or entity,often the property owner,whose operational control is limited to: (a) the employment of other operators,such as a general contractor,to perform or supervise construction activities,or (b) the ability to approve or disapprove changes to construction plans and specifications, but who does not have day-to-day on-site operational control over construction activities at the site. Secondary operators must either prepare their own SWP3 or participate in a shared SWP3 that covers the areas of the construction site where they have control over the plans and specifications. If there is not a primary operator at the construction site,then the secondary operator is defined as the primary operator and must comply with the requirements for primary operators. Outfall-For the purpose of this permit,a point source at the point where stormwater runoff associated with construction activity discharges to surface water in the state and does not include open conveyances connecting two municipal separate storm sewers,or pipes, tunnels,or other conveyances that connect segments of the same stream or other water of the U.S. and are used to convey waters of the U.S. Permittee-An operator authorized under this general permit. The authorization may be gained through submission of a notice of intent,by waiver,or by meeting the requirements for automatic coverage to discharge stormwater runoff and certain non-stormwater discharges. Page 9 Construction General Permit TPDES General Permit TXR150000 Point Source—(from 4o CFR§122.2)Any discernible,confined,and discrete conveyance, including but not limited to,any pipe,ditch,channel,tunnel,conduit,well,discrete fissure, `l container,rolling stock concentrated animal feeding operation,landfill leachate collection system,vessel or other floating craft from which pollutants are,or maybe,discharged. This term does not include return flows from irrigated agriculture or agricultural stormwater runoff. Pollutant-Dredged spoil,solid waste,incinerator residue,sewage,garbage,sewage sludge, filter backwash,munitions,chemical wastes,biological materials,radioactive materials,heat, wrecked or discarded equipment,rock,sand,cellar dirt,and industrial,municipal,and agricultural waste discharged into any surface water in the state. The term"pollutant"does not include tail water or runoff water from irrigation or rainwater runoff from cultivated or uncultivated rangeland,pastureland,and farmland. For the purpose of this permit,the term "pollutant"includes sediment. Pollution-(from Texas Water Code(TWC) §26.001(14))The alteration of the physical, thermal,chemical,or biological quality of,or the contamination of,any surface water in the state that renders the water harmful,detrimental,or injurious to humans,animal life, vegetation,or property or to public health,safety,or welfare,or impairs the usefulness or the public enjoyment of the water for any lawful or reasonable purpose. Rainfall Erosivity Factor(R factor)-the total annual erosive potential that is due to climatic effects,and is part of the Revised Universal Soil Loss Equation(RUSLE). Receiving Water-A"Water of the United States"as defined in 4o CFR§122.2 into which the regulated stormwater discharges. Semiarid Areas-areas with an average annual rainfall of 10 to 20 inches Separate Storm Sewer System-A conveyance or system of conveyances(including roads with drainage systems,streets,catch basins,curbs,gutters,ditches,man-made channels,or storm drains),designed or used for collecting or conveying stormwater;that is not a combined sewer,and that is not part of a publicly owned treatment works(POTW). Small Construction Activity-Construction activities including clearing,grading,and excavating that result in land disturbance of equal to or greater than one(1)acre and less than five(5)acres of land.Small construction activity also includes the disturbance of less than one(1)acre of total land area that is part of a larger common plan of development or sale if the larger common plan will ultimately disturb equal to or greater than one(1)and less than five(5)acres of land. Small construction activity does not include routine maintenance that is performed to maintain the original line and grade,hydraulic capacity,or original purpose of the site(for example,the routine grading of existing dirt roads,asphalt overlays of existing roads,the routine clearing of existing right-of-ways,and similar maintenance activities.) Steep Slopes—Where a state,Tribe,local government,or industry technical manual(e.g. stormwater BMP manual)has defined what is to be considered a"steep slope",this permit's definition automatically adopts that definition.Where no such definition exists,steep slopes are automatically defined as those that are 15 percent or greater in grade. Stormwater(or Stormwater Runoff)-Rainfall runoff,snow melt runoff,and surface runoff and drainage. Stormwater Associated with Construction Activity-Stormwater runoff from a construction activity where soil disturbing activities(including clearing,grading,excavating) result in the disturbance of one(1)or more acres of total land area,or are part of a larger common plan of development or sale that will result in disturbance of one(1)or more acres of total land area. Structural Control(or Practice)-A pollution prevention practice that requires the construction of a device,or the use of a device,to reduce or prevent pollution in stormwater Page 10 Construction General Permit TPDES General Permit TXR150000 runoff. Structural controls and practices may include but are not limited to•silt fences, earthen dikes,drainage swales,sediment traps,check dams,subsurface drains,storm drain inlet protection,rock outlet protection,reinforced soil retaining systems,gabions,and temporary or permanent sediment basins. Surface Water in the State- Lakes,bays,ponds,impounding reservoirs,springs,rivers, streams,creeks,estuaries,wetlands,marshes,inlets,canals,the Gulf of Mexico inside the territorial limits of the state(from the mean high water mark(MHWM)out1o.36 miles into the Gulf),and all other bodies of surface water,natural or artificial,inland or coastal,fresh or salt,navigable or nonnavigable,and including the beds and banks of all water-courses and bodies of surface water,that are wholly or partially inside or bordering the state or subject to the jurisdiction of the state;except that waters in treatment systems which are authorized by state or federal law,regulation,or permit,and which are created for the purpose of waste treatment are not considered to be water in the state. Temporary Stabilization-A condition where exposed soils or disturbed areas are provided a protective cover or other structural control to prevent the migration of pollutants. Temporary stabilization may include temporary seeding,geotektiles,mulches,and other techniques to reduce or eliminate erosion until either permanent stabilization can be achieved or until further construction activities take place. Total Maximum Daily Load(TMDL)-The total amount of a pollutant that a water body can assimilate and still meet the Texas Surface Water Quality Standards. Turbidity—A condition of water quality characterized by the presence of suspended solids and/or organic material. Waters of the United States-(from 40 CFR§122.2)Waters of the United States or waters of the U.S.means: (a) all waters which are currently used,were used in the past,or may be susceptible to use in interstate or foreign commerce,including all waters which are subject to the ebb and flow of the tide; (b) all interstate waters,including interstate wetlands; (c) all other waters such as intrastate lakes,rivers,streams(including intermittent streams),mudflats,sandflats,wetlands,sloughs,prairie potholes,wet meadows, playa lakes,or natural ponds that the use,degradation,or destruction of which would affect or could affect interstate or foreign commerce including any such waters: (1) which are or could be used by interstate or foreign travelers for recreational or other purposes, (2) from which fish or shellfish are or could be taken and sold in interstate or foreign commerce; or (3) which are used or could be used for industrial purposes by industries in interstate commerce; (d) all impoundments of waters otherwise defined as waters of the United States under this definition, (e) tributaries of waters identified in paragraphs(a)through(d)of this definition, (f) the territorial sea, and (g) wetlands adjacent to waters(other than waters that are themselves wetlands) identified in paragraphs(a)through(f)of this definition. Waste treatment systems,including treatment ponds or lagoons designed to meet the requirements of CWA(other than cooling ponds as defined in 4o CFR§423.11(m)which also meet the criteria of this definition)are not waters of the U.S. This exclusion applies only to manmade bodies of water which neither were originallycreated in waters of the U.S.(such as Page 11 Construction General Permit TPDES General Permit TXRi50o00 disposal area in wetlands)nor resulted from the impoundment of waters of the U.S. Waters of the U.S.do not include prior converted cropland. Notwithstanding the determination of an area's status as prior converted cropland by any other federal agency,for the purposes of the CWA,the final authority regarding CWA jurisdiction remains with EPA. Part II. Permit Applicability and Coverage Section A. Discharges Eligible for Authorization 1. Stormwater Associated with Construction Activity Discharges of stormwater runoff from small and large construction activities maybe authorized under this general permit. 2. Discharges of Stormwater Associated with Construction Support Activities Examples of construction support activities include,but are not limited to,concrete batch plants,rock crushers, asphalt batch plants,equipment staging areas,material storage yards,material borrow areas,and excavated material disposal areas. Construction support activities authorized under this general permit are not commercial operations,and do not serve multiple unrelated construction projects. Discharges of stormwater runoff from construction support activities maybe authorized under this general permit,provided that the following conditions are met: (a) the activities are located within one(1)mile from the boundary of the permitted construction site and directly support the construction activity; (b) an SWP3 is developed for the permitted construction site according to the provisions of this general permit,and includes appropriate controls and measures to reduce erosion and discharge of pollutants in stormwater runoff from the construction support activities,and (c) the construction support activities either do not operate beyond the completion date of the construction activity or,at the time that they do,are authorized under separate Texas Pollutant Discharge Elimination System(TPDES)authorization. Separate TPDES authorization may include the TPDES Multi Sector General Permit(MSGP), TXRo50000(related to stormwater discharges associated with industrial activity), separate authorization under this general permit if applicable,coverage under an alternative general permit if available,or authorization under an individual water quality permit. 3. Non-Stormwater Discharges The following non-stormwater discharges from sites authorized under this general permit are also eligible for authorization under this general permit: (a) discharges from fire fighting activities(fire fighting activities do not include washing of trucks,run-off water from training activities,test water from fire suppression systems,or similar activities); (b) uncontaminated fire hydrant flushings(excluding discharges of hyperchlorinated water,unless the water is first dechlorinated and discharges are not expected to adversely affect aquatic life),which include flushings from systems that utilize potable water,surface water,or groundwater that does not contain additional pollutants(uncontaminated fire hydrant flushings do not include systems utilizing reclaimed wastewater as a source water); (c) water from the routine external washing of vehicles,the external portion of buildings or structures,and pavement,where detergents and soaps are not used,where spills or leaks of toxic or hazardous materials have not occurred(unless spilled materials Page 12 Construction General Permit TPDES General Permit TXRi50000 have been removed, and if local state,or federal regulations are applicable,the materials are removed according to those regulations),and where the purpose is to remove mud,dirt,or dust; (d) uncontaminated water used to control dust; (e) potable water sources,including waterline flushings,but excluding discharges of hyperchlorinated water,unless the water is first dechlorinated and discharges are not expected to adversely affect aquatic life; (f) uncontaminated air conditioning condensate; (g) uncontaminated ground water or spring water,including foundation or footing drains where flows are not contaminated with industrial materials such as solvents; and (h) lawn watering and similar irrigation drainage. 4. Other Permitted Discharges Any discharge authorized under a separate National Pollutant Discharge Elimination System(NPDES),TPDES,or TCEQ permit may be combined with discharges authorized by this general permit,provided those discharges comply with the associated permit. Section B. Concrete Truck Wash Out The wash out of concrete trucks at regulated construction sites must be performed in accordance with the requirements of Part V of this general permit. Section C. Limitations on Permit Coverage 1. Post Construction Discharges Discharges that occur after construction activities have been completed,and after the construction site and any supporting activity site have undergone final stabilization,are not eligible for coverage under this general permit. Discharges originating from the sites are not authorized under this general permit following the submission of the notice of termination(NOT)or removal of the appropriate site notice,as applicable,for the regulated construction activity 2. Prohibition of Non-Stormwater Discharges Except as otherwise provided in Part II.A.of this general permit,only discharges that are composed entirely of stormwater associated with construction activity may be authorized under this general permit. 3. Compliance With Water Quality Standards Discharges to surface water in the state that would cause,have the reasonable potential to cause,or contribute to a violation of water quality standards or that would fail to protect and maintain existing designated uses are not eligible for coverage under this general permit. The executive director may require an application for an individual permit or alternative general permit(see Parts II.H.2.and 3.)to authorize discharges to surface water in the state if the executive director determines that any activity will cause, has the reasonable potential to cause,or contribute to a violation of water quality standards or is found to cause,has the reasonable potential to cause,or contribute to, the impairment of a designated use. The executive director may also require an application for an individual permit considering factors described in Part II.H.2.of this general permit. Page 13 Construction General Permit TPDES General Permit TXR1500o0 4. Impaired Receiving Waters and Total Maximum Daily Load(TMDL)Requirements New sources or new discharges of the pollutants of concern to impaired waters are not authorized by this permit unless otherwise allowable under 30 TAC Chapter 305 and applicable state law Impaired waters are those that do not meet applicable water quality standards and are listed on the EPA approved CWA§3o3(d)List.Pollutants of concern are those for which the water body is listed as impaired. Discharges of the pollutants of concern to impaired water bodies for which there is a TMDL are not eligible for this general permit unless they are consistent with the approved TMDL. Permittees must incorporate the conditions and requirements applicable to their discharges into their SWP3,in order to be eligible for coverage under this general permit. For consistency with the construction stormwater-related items in an approved TMDL,the SWP3 must be consistent with any applicable condition,goal,or requirement in the TMDL,TMDL Implementation Plan(I-Plan),or as otherwise directed by the executive director 5. Discharges to the Edwards Aquifer Recharge or Contributing Zone Discharges cannot be authorized by this general permit where prohibited by 3o TAC Chapter 213(relating to Edwards Aquifer). In addition,commencement of construction (i.e.,the initial disturbance of soils associated with clearing,grading,or excavating activities,as well as other construction-related activities such as stockpiling of fill material and demolition)at a site regulated under 3o TAC-Chapter 213,may not begin until the appropriate Edwards Aquifer Protection Plan(EAPP)has been approved by the TCEQ's Edwards Aquifer Protection Program. (a) For new discharges located within the Edwards Aquifer Recharge Zone,or within that area upstream from the recharge zone and defined as the Contributing Zone (CZ),operators must meet all applicable requirements of,and operate according to, 3o TAC Chapter 213 (Edwards Aquifer Rule)in addition to the provisions and requirements of this general permit. (b) For existing discharges located within the Edwards Aquifer Recharge Zone,the requirements of the agency-approved Water Pollution Abatement Plan(WPAP) under the Edwards Aquifer Rule is in addition to the requirements of this general permit. BMPs and maintenance schedules for structural stormwater controls,for example,may be required as a provision of the rule. All applicable requirements of the Edwards Aquifer Rule for reductions of suspended solids in stormwater runoff are in addition to the requirements in this general permit for this pollutant. 6. Discharges to Specific Watersheds and Water Quality Areas Discharges otherwise eligible for coverage cannot be authorized by this general permit where prohibited by 3o TAC Chapter 311(relating to Watershed Protection)for water quality areas and watersheds. 7 Protection of Streams and Watersheds by Other Governmental Entities This general permit does not limit the authority or ability of federal,other state,or local governmental entities from placing additional or more stringent requirements on construction activities or discharges from construction activities. For example,this permit does not limit the authority of a home-rule municipality provided by Texas Local Government Code§4oi.0o2. 8. Indian Country Lands Stormwater runoff from construction activities occurring on Indian Country lands are not under the authority of the TCEQ and are not eligible for coverage under this general permit. If discharges of stormwater require authorization under federal NPDES Page 1.4 Construction General Permit TPDES General Permit TXR15oo00 regulations,authority for these discharges must be obtained from the U.S. Environmental Protection Agency(EPA). 9. Oil and Gas Production Stormwater runoff from construction activities associated with the exploration, development,or production of oil or gas or geothermal resources,including transportation of crude oil or natural gas by pipeline,are not under the authority of the TCEQ and are not eligible for coverage under this general permit. If discharges of stormwater require authorization under federal NPDES regulations,authority for these discharges must be obtained from the EPA. 10. Stormwater Discharges from Agricultural Activities Stormwater discharges from agricultural activities that are not point source discharges of stormwater are not subject to TPDES permit requirements. These activities may include clearing and cultivating ground for crops,construction of fences to contain livestock,construction of stock ponds,and other similar agricultural activities. Discharges of stormwater runoff associated with the construction of facilities that are subject to TPDES regulations,such as the construction of concentrated animal feeding operations,would be point sources regulated under this general permit. ii. Endangered Species Act Discharges that would adversely affect a listed endangered or threatened aquatic or aquatic-dependent species or its critical habitat are not authorized by this permit,unless the requirements of the Endangered Species Act are satisfied.Federal requirements related to endangered species apply to all TPDES permitted discharges and site-specific controls may be required to ensure that protection of endangered or threatened species is achieved. If a permittee has concerns over potential impacts to listed species,the permittee may contact TCEQ for additional information. 12. Other Nothing in Part II of the general permit is intended to negate any person's ability to assert the force majeure(act of God,war,strike,riot,or other catastrophe)defenses found in 3o TAC§70.7 Section D. Deadlines for Obtaining Authorization to Discharge 1. Large Construction Activities (a) New Construction-Discharges from sites where the commencement of construction occurs on or after the effective date of this general permit must be authorized,either under this general permit or a separate TPDES permit,prior to the commencement of those construction activities. (b) Ongoing Construction-Operators of large construction activities continuing to operate after the effective date of this permit,and authorized under TPDES general permit TXRl50000(effective on March 5,2008),must submit an-NOI to renew authorization or a NOT to terminate coverage under this general permit within 90 days of the effective date of this general.permit. During this interim period,as a requirement of this TPDES permit,the operator must continue to meet the conditions and requirements of the previous TPDES permit. 2. Small Construction Activities (a) New Construction-Discharges from sites where the commencement of construction occurs on or after the effective date of this general permit must be authorized,either Page 15 Construction General Permit TPDES General Permit TXRi5o0o0 under this general permit or a separate TPDES permit,prior to the commencement of those construction activities. (b) Ongoing Construction-Discharges from ongoing small construction.activities that commenced prior to the effective date of this general permit,and that would not meet the conditions to qualify for termination of this permit as described in Part II.E.of this general permit,must meet the requirements to be authorized,either under this general permit or a separate TPDES permit,within 90 days of the effective date of this general permit.During this interim period,as a requirement of this TPDES permit,the operator must continue to meet the conditions and requirements of the previous TPDES permit. Section E. Obtaining Authorization to Discharge i. Automatic Authorization for Small Construction Activities With Low Potential for Erosion. If all of the following conditions are met,then a small construction activity is determined to occur during periods of low potential for erosion,and a site operator may be automatically authorized under this general permit without being required to develop an SWP3 or submit an NOI. (a) the construction activity occurs in a county listed in Appendix A, (b) the construction activity is initiated and completed,including either final or temporary stabilization of all disturbed areas,within the time frame identified in Appendix A for the location of the construction site; (c) all temporary stabilization is adequately maintained to effectively reduce or prohibit erosion,permanent stabilization activities have been initiated,and a condition of final stabilization is completed no later than 3o days following the end date of the time frame identified in Appendix A for the location of the construction site; (d) the permittee signs a completed TCEQ construction site notice,including the certification statement; (e) a signed copy of the construction site notice is posted at the construction site in a location where it is readily available for viewing by the general public,local,state,and federal authorities prior to commencing construction activities,and maintained in that location until completion of the construction activity; (f) a copy of the signed and certified construction site notice is provided to the operator of any MS4 receiving the discharge at least two days prior to commencement of construction activities; (g) any supporting concrete batch plant or asphalt batch plant is separately authorized for discharges of stormwater runoff or other non-stormwater discharges under an individual TPDES permit,another TPDES general permit,or under an individual TCEQ permit where stormwater and non-stormwater is disposed of by evaporation or irrigation(discharges are adjacent to water in the state),and (h) any non-stormwater discharges are either authorized under a separate permit or authorization,or are not considered to be a wastewater Part II.G of this general permit describes how an operator may apply for and obtain a waiver from permitting,for certain small construction activities that occur during a period with a low potential for erosion,where automatic authorization under this section is not available. Page 16 Construction General Permit TPDES General Permit TXR150000 2. Automatic Authorization For All Other Small Construction Activities: Operators of small construction activities not described in Part II.E.1.above may be automatically authorized under this general permit,and operators of these sites shall not be required to submit an NOI,provided that they meet all of the following conditions. (a) develop a SWP3 according to the provisions of this general permit,that covers either the entire site or all portions of the site for which the applicant is the operator,and implement that plan prior to commencing construction activities; (b) sign and certify a completed TCEQ small construction site notice,post the notice at the construction site in a location where it is safely and readily available for viewing by the general public,local,state,and federal authorities,prior to commencing construction,and maintain the notice in that location until completion of the construction activity(for linear construction activities,e.g.pipeline or highway,the site notice must be placed in a publicly accessible location near where construction is actively underway;notice for these linear sites may be relocated,as necessary,along the length of the project,and the notice must be safely and readily available for viewing by the general public;local,state,and federal authorities);and (c) provide a copy of the signed and certified construction site notice to the operator of any municipal separate storm sewer system receiving the discharge prior to commencement of construction activities. Operators of small construction activities as defined in Part I.B of this general permit shall not submit an NOI for coverage unless otherwise required by the executive director As described in Part I(Definitions)of this general permit,large construction activities include those that will disturb less than five(5)acres of land,but that are part of a larger common plan of development or sale that will ultimately disturb five(5)or more acres of land,and must meet the requirements of Part II.E.3.below 3. Authorization for Large Construction Activities: Operators of large,construction activities that qualify for coverage under this general permit must meet all of the following conditions: (a) develop a SWP3 according to the provisions of this general permit that covers either the entire site or all portions of the site for which the applicant is the operator,and implement that plan prior to commencing construction activities, (b) primary operators must submit an NOI,using a form provided by the executive director,at least seven(7)days prior to commencing construction activities,or if utilizing electronic submittal,prior to commencing construction activities. If an additional primary operator is added after the initial NOI is submitted,the new primary operator must submit an NOI at least seven(7)days before assuming operational control,or if utilizing electronic NOI submittal,prior to assuming operational control. If the primary operator changes after the initial NOI is submitted,the new primary operator must submit a paper NOI or an electronic NOI at least ten(io)days before assuming operational control, (c) all operators of large construction activities must post a site notice in accordance with Part III.D.2.of this permit. The site notice must be located where it is safely and readily available for viewing by the general public,local,state,and federal authorities prior to commencing construction,and must be maintained in that location until completion of the construction activity(for linear construction activities,e.g.pipeline or highway,the site notice must be placed in a publicly accessible location near where construction is actively underway;notice for these linear sites maybe relocated,as necessary,along the length of the project,and the notice must be safely and readily available for viewing by the general public;local,state,and federal authorities); Page 17 Construction General Permit TPDES General Permit TXR150000 (d) prior to commencing construction activities,all primary operators must(1)provide a copy of the signed NOI to the operator of any MS4 receiving the discharge and to any secondary construction operator,and(2)list in the SWP3 the names and addresses of all MS4 operators receiving a copy; (e) all persons meeting the definition of"secondary operator"in Part I of this permit are hereby notified that they are regulated under this general permit,but are not required to submit an NOI,provided that a primary operator at the site has submitted an NOI,or is required to submit an NOI,and the secondary operator has provided notification to the operator(s)of the need to obtain coverage(with records of notification available upon request). Any secondary operator notified under this provision may alternatively submit an NOI under this general permit,may seek coverage under an alternative TPDES individual permit,or may seek coverage under an alternative TPDES general permit if available;and (f) all secondary operators must provide a copy of the signed and certified Secondary Operator construction site notice to the operator of any MS4 receiving the discharge prior to commencement of construction activities. 4. Waivers for Small Construction Activities: Part II.G describes how operators of certain small construction activities may obtain a waiver from coverage. 5. Effective Date of Coverage (a) Operators of small construction activities as described in either Part II.E.1.or II.E.2. above are authorized immediately following compliance with the applicable conditions of Part II.E.1.or II.E.2. Secondary operators of large construction activities as described in Part II.E.3.above are authorized immediately following compliance with the applicable conditions in Part II.E.3. For activities located in areas regulated by 3o TAC Chapter 213,related to the Edwards Aquifer,this authorization to discharge is separate from the requirements of the operator's responsibilities under that rule. Construction may not commence for sites regulated under 30 TAC Chapter 213 until all applicable requirements of that rule are met. (b) Primary operators of large construction activities as described in Part II.E.3. above are provisionally authorized seven(7Ydays from the date that a completed NOI is postmarked for delivery to the TCEQ,unless otherwise notified by the executive director If electronic submission of the NOI is provided,and unless otherwise notified by the executive director,primary operators are authorized immediately following confirmation of receipt of the NOI by the TCEQ. Authorization is non- provisional when the executive director finds the NOI is administratively complete and an authorization number is issued for the activity For activities located in areas regulated by 3o TAC Chapter 213,related to the Edwards Aquifer,this authorization to discharge is separate from the requirements of the operator's responsibilities under that rule. Construction may not commence for sites regulated under 3o TAC Chapter 213 until all applicable requirements of that rule are met. (c) Operators are not prohibited from submitting late NOIs or posting late notices to obtain authorization under this general permit. The TCEQ reserves the right to take appropriate enforcement actions for any unpermitted activities that may have occurred between the time construction commenced and authorization was obtained. 6. Notice of Change(NOC) If relevant information provided in the NOI changes,an NOC must be submitted at least 14 days before the change occurs,if possible. Where 14-day advance notice is not possible,the operator must submit an NOC within 14 days of discovery of the change. If Page 18 Construction General Permit TPDES General Permit TXR15o000 the operator becomes aware that it failed to submit any relevant facts or submitted incorrect information in an NOI,the correct information must be provided to the executive director in an NOC within 14 days after discovery The NOC shall be submitted on a form provided by the executive director,or by letter if an NOC form is not available. A copy of the NOC must also be provided to the operator of any MS4 receiving the discharge,and a list must be included in the SWP3 that includes the names and addresses of all MS4 operators receiving a copy Information that may be included on an NOC includes,but is not limited to,the following: the description of the construction project,an increase in the number of acres disturbed(for-increases of one or more acres),or the operator name. A transfer of operational control from one operator to another,including a transfer of the ownership of a company,may not be included in an NOC. A transfer of ownership of a company includes changes to the structure of a company, such as changing from a partnership to a corporation or changing corporation types,so that the filing number(or charter number)that is on record with the Texas Secretary of State must be changed. An NOC is not required for notifying TCEQ of a decrease in the number of acres disturbed. This information must be included in the SWP3 and retained on site. 7 Signatory Requirement for NOI Forms,Notice of Termination(NOT)Forms,NOC Letters,and Construction Site Notices NOI forms,NOT forms,NOC letters,and Construction Site Notices that require a , signature must be signed according to 3o TAC§305.44(relating to Signatories for Applications). 8. Contents of the NOI The NOI form shall require,at a minimum,the following information. (a) the TPDES CGP authorization number for existing authorizations under this general permit,where the operator submits an NOI to renew coverage within 90 days of the effective date of this general permit; (b) the name,address,and telephone number of the operator filing the NOI for permit coverage; (c) the name(or other identifier);address,county,and latitude/longitude of the construction project or site; (d)the number of acres that will be disturbed by the applicant; (e) confirmation that the project or site will not be located on Indian Country lands; (f) confirmation that a SWP3 has been developed in accordance with this general permit, that it will be implemented prior to construction,and that it is compliant with any applicable local sediment and erosion control plans;for multiple operators who prepare a shared SWP3,the confirmation for an operator may be limited to its obligations under the SWP3 provided all obligations are confirmed by at least one operator; (g) name of the receiving water(s); (h)the classified segment number for each classified segment that receives discharges from the regulated construction activity(if the discharge is not directly to a classified segment,then the classified segment number of the first classified segment that those discharges reach),and (i) the name of all surface waters receiving discharges from the regulated construction activity that are on the latest EPA-approved CWA§3o3(d)List of impaired waters. Page 19 Construction General Permit TPDES General Permit TXR150000 Section F. Terminating Coverage 1. Notice of Termination(NOT)Required Each operator that has submitted an NOI for authorization under this general permit must apply to terminate that authorization following the conditions described in this section of the general permit. Authorization must be terminated by submitting an NOT on a form supplied by the executive director Authorization to discharge under this general permit terminates at midnight on the day the NOT is postmarked for delivery to the TCEQ If electronic submission of the NOT is provided,authorization to discharge under this permit terminates immediately following confirmation of receipt of the NOT by the TCEQ. Compliance with the conditions and requirements of this permit is required until an NOT is submitted. The NOT must be submitted to TCEQ,and a copy of the NOT provided to the operator of any MS4 receiving the discharge(with a list in the SWP3 of the names and addresses of all MS4 operators receiving a copy),within 3o days after any of the following conditions are met: (a) final stabilization has been achieved on all portions of the site that are the responsibility of the permittee; (b) a transfer of operational control has occurred(See Section II.F.4.below);or (c) the operator has obtained alternative authorization under an individual TPDES permit or alternative TPDES general permit. 2. Minimum Contents of the NOT The NOT form shall require,at a minimum,the following information. (a) if authorization was granted following submission of an NOI,the permittee's site- specific TPDES authorization number for the construction site; (b) an indication of whether the construction activity is completed or if the permittee is simply no longer an operator at the site; (c) the name,address,and telephone number of the permittee submitting the NOT, (d) the name(or other identifier),address,county, and location(latitude/longitude)of the construction project or site;and (e) a signed certification that either all stormwater discharges requiring authorization under this general permit will no longer occur,or that the applicant is no longer the operator of the facility or construction site,and that all temporary structural erosion controls have either been removed,will be removed on a schedule defined in the SWP3,or have been transferred to a new operator if the new operator has applied for permit coverage. Erosion controls that are designed to remain in place for an indefinite period,such as mulches and fiber mats,are not required to be removed or scheduled for removal. 3. Termination of Coverage for Small Construction Sites and for Secondary Operators at Large Construction Sites Each operator that has obtained automatic authorization and has not been required to submit an NOI must remove the site notice upon meeting any of the conditions listed below,complete the applicable portion of the site notice related to removal of the site notice,and submit a copy of the completed site notice to the operator of any MS4 receiving the discharge(or provide alternative notification as allowed by the MS4 operator,with documentation of such notification included in the SWP3),within 3o days of meeting any of the following conditions. Page 20 Construction General Permit TPDES General Permit TXR150000 (a) final stabilization has been achieved on all portions of the site that are the responsibility of the permittee; (b) a transfer of operational control has occurred(See Section II.F.4.below); or (c) the operator has obtained alternative authorization under an individual or general TPDES permit. Authorization to discharge under this general permit terminates immediately upon removal of the applicable site notice. Compliance with the conditions and requirements of this permit is required until the site notice is removed. 4. Transfer of Operational Control Coverage under this general permit is not transferable. A transfer of operational control includes changes to the structure of a company,such as changing from a partnership to a corporation,or changing to a different corporation type such that a different filing(or charter)number is established with the Texas Secretary of State. When the primary operator of a large construction activity changes or operational control is transferred,the original operator must submit an NOT within ten(io)days prior to the date that responsibility for operations terminates,and the new operator must submit an NOI at least ten(io)days prior to the transfer of operational control,in accordance with condition(a)or(b)below A copy of the NOT must be provided to the operator of any MS4 receiving the discharge in accordance with Section II.F.i.above. Operators of regulated construction activities who are not required to submit an NOI must remove the original site notice,and the new operator must post the required site notice prior to the transfer of operational control,in accordance with condition(a)or(b) below A copy of the completed site notice must be provided to the operator of any MS4 receiving the discharge,in accordance with Section II.F.3.above. A transfer of operational control occurs when either of the following criteria is met: (a) Another operator has assumed control over all areas of the site that have not been finally stabilized, and all silt fences and other temporary erosion controls have either been removed,scheduled for removal as defined in the SWP3,or transferred to a new operator,provided that the permitted operator has attempted to notify the new operator in writing of the requirement to obtain permit coverage. Record of this notification(or attempt at notification)shall be retained by the operator in accordance with Part VI of this permit. Erosion controls that are designed to remain in place for an indefinite period,such as mulches and fiber mats,are not required to be removed or scheduled for removal. (b) A homebuilder has purchased one or more lots from an operator who obtained coverage under this general permit for a common plan of development or sale. The homebuilder is considered a new operator and shall comply with the requirements listed above,including the development of a SWP3 if necessary Under these circumstances,the homebuilder is only responsible for compliance with the general permit requirements as they apply to lot(s)it has operational control over,and the original operator remains responsible for common controls or discharges,and must amend its SWP3 to remove the lot(s)transferred to the homebuilder Section G. Waivers from Coverage The executive director may waive the otherwise applicable requirements of this general permit for stormwater discharges from small construction activities under the terms and conditions described in this section. Page 21 Construction General Permit TPDES General Permit TXR150000 i. Waiver Applicability and Coverage Operators of small construction activities may apply for and receive a waiver from the requirements to obtain authorization underthis.general permit;where all of the following conditions are net. This'waiver from coverage does not apply to non- stormwater discharges. The operator must insure that any non-stormwater'discharges are either authorized under'a separate permit or authorization,or are not considered to' be a wastewater (a) the calculated rainfall erosivity(R):factor for the entire period of the construction project is less than.five(5); .(b) the operator submits to.the TCEQ a signed waiver certification.form,supplied.by the executive director,certifying that the construction activity will commence and be completed within a period when the value of the calculated R factor is less.than five (5);and (c) the waiver certification form is postmarked for delivery to the TCEQ.at least.seven(7) days before construction activity:begins or,if electronic filing is available,.then any time following the receipt of written confirmation from TCEQ.that a complete_ electronic application was submitted and acknowledged. 2. Steps to Obtaining a Waiver The construction site operator may calculate the R factor to request a waiver using the. following steps: (a).Estimate the construction start date and the construction end date. The construction end date'is the date that final stabilization will be achieved. (b) Find the appropriate Erosivity Index(EI)zone in Appendix•B of this permit. (c) Find the EI percentage for the'project period by adding the results for:each period of the.project using the table provided in Appendix'D of this permit;in EPA Fact Sheet. 2.1,or in USDA Handbook 703,by subtracting the start value from the end value to find'the percent EI for the site. (d) Refer to the:Isoerodent Map(Appendix C of this permit)and interpolate the annual isoerodent value for the proposed construction location. (e) Multiply the percent value.obtained in Step(e)aboveby the annual isoerodent value obtained:in Step(d). This is the'R factor for the proposed project. If the value is less than 5,then a waiver may be obtained. If the value is five(5)or:more,then a waiver may not be obtained,and the operator mustobtain coverage under Part II.E.2.of this permit Alternatively,the operator may calculate:a site-specific Rfactor utilizing thefollowing online calculator http://ei.tamu.edu/index.html,or using another available resource. The waiver certification form is not required to be.posted at the small construction site. 3. Effective Date of Waiver Operators of small construction activities are provisionally waived from the otherwise applicable requirements of this general permit seven(7)days from the'date that a completed waiver certification form isspostmarked for delivery to TCEQ,or immediately upon-receiving confirmation of approval of.an electronic submittal;if electronic form submittals.are available. 4. Activities Extending Beyond:the Waiver Period: If a construction activity extends beyond the approved waiver period due to circumstances beyond the control of the operator,:the operator must either Page 22 Construction General Permit TPDES General Permit TXR150000 (a) recalculate the R factor using the original start date and a new projected ending date, and if the R factor is still under five(5),submit a new waiver certification form at least two(2)days before the end of the original waiver period,or (b) obtain authorization under this general permit according to the requirements delineated in either Part II.E.2.or Part II.E.3.before the end of the approved waiver period. Section H. Alternative TPDES Permit Coverage 1. Individual Permit Alternative Any discharge eligible for coverage under this general permit may alternatively be authorized under an individual TPDES permit according to 3o TAC§305(relating to Consolidated Permits) Applications for individual permit coverage should be submitted at least three hundred and thirty(330)days prior to commencement of construction activities to ensure timely authorization. 2. Individual Permit Required The executive director may suspend an authorization or deny an NOI in accordance with the procedures set forth in 3o TAC§205(relating to General Permits for Waste Discharges),including the requirement that the executive director provide written notice to the permittee. The executive director may require an operator of a construction site, otherwise eligible for authorization under this general permit,to apply for an individual TPDES permit in the following circumstances. (a) the conditions of an approved TMDL or TMDL I-Plan on the receiving water; (b) the activity being determined to cause a violation of water quality standards or being found to cause,or contribute to,the loss of a designated use of surface water in the state: and (c) any other consideration defined in 3o TAC Chapter 205(relating to General Permits for Waste Discharges)including 30 TAC Chapter 205.4(c)(3)(D),which allows the commission to deny authorization under the general permit and require an individual permit if a discharger"has been determined by the executive director to have been out of compliance with any rule,order,or permit of the commission,including non- payment of fees assessed by the executive director" Additionally,the executive director may cancel,revoke,or suspend authorization to discharge under this general permit based on a finding of historical and significant noncompliance with the provisions of this general permit,relating to 3o TAC§60.3(Use of Compliance History). Denial of authorization to discharge under this general permit or suspension of a permittee's authorization under this'general permit shall be done according to commission rules in 3o TAC Chapter 205(relating to General Permits for Waste Discharges). 3. Alternative Discharge Authorization Any discharge eligible for authorization under this general permit may alternatively be authorized under a separate general permit according to 3o TAC Chapter 205(relating to General Permits for Waste Discharges),if applicable. Section I. Permit Expiration 1. This general permit is effective for a term not to exceed five(5)years. All active discharge authorizations expire on the date provided on page one(1)of this permit. Following public notice and comment,as provided by 3o TAC§205.3(relating to Page 23 Construction General Permit TPDES General Permit TXR150000 Public Notice,Public Meetings,and Public Comment),the commission may amend, revoke,cancel,or renew this general permit. 2. If the executive director publishes a notice of the intent to renew or amend this general permit before the expiration date,the permit will remain in effect for existing,authorized discharges until the commission takes final action on the permit. Upon issuance of a renewed or amended permit,permittees may be required to submit an NOI within 90 days following the effective date of the renewed or amended permit,unless that permit provides for an alternative method for obtaining authorization. 3. If the commission does not propose to reissue this general permit within 90 days before the expiration date,permittees shall apply for authorization under an individual permit or an alternative general permit. If the application for an individual permit is submitted before the expiration date,authorization under this expiring general permit remains in effect until the issuance or denial of an individual permit. No new NOIs will be accepted nor new authorizations honored under the general permit after the expiration date. Part III. Stormwater Pollution Prevention Plans(SWP3) All regulated construction site operators shall prepare an SWP3,prior to submittal of an NOI,to address discharges authorized under Parts II.E.2.and II.E.3.of this general permit that will reach Waters of the U.S.,including discharges to MS4s and privately owned separate storm sewer systems that drain to Waters of the U.S.,to identify and address potential sources of pollution that are reasonably expected to affect the quality of discharges from the construction site,including off-site material storage areas,overburden and stockpiles of dirt,borrow areas,equipment staging areas,vehicle repair areas,fueling areas, etc.,used solely by the permitted project. The SWP3 must describe the implementation of practices that will be used to minimize to the extent practicable the discharge of pollutants in stormwater associated with construction activity and non-stormwater discharges described in Part II.A.3.,in compliance with the terms and conditions of this permit. Individual operators at a site may develop separate SWP3s that cover only their portion of the project,provided reference is made to the other operators at the site. Where there is more than one SWP3 for a site,permittees must coordinate to ensure that BMPs and controls are consistent and do not negate or impair the effectiveness of each other Regardless of whether a single comprehensive SWP3 is developed or separate SWP3s are developed for each operator,it is the responsibility of each operator to ensure compliance with the terms and conditions of this general permit in the areas of the construction site where that operator has control over construction plans and specifications or day-to-day operations. Section A. Shared SWP3 Development For more effective coordination of BMPs and opportunities for cost sharing,a cooperative effort by the different operators at a site is encouraged. Operators must independently obtain authorization,but may work together to prepare and implement a single,comprehensive SWP3 for the entire construction site. 1. The SWP3 must clearly list the name and,for large construction activities,the general permit authorization numbers,for eackoperator that participates in the shared SWP3. Until the TCEQ responds to receipt of the NOI with a general permit authorization number,the SWP3 must specify the date that the NOI was submitted to TCEQ by each operator Each operator participating in the shared plan must also sign the SWP3. Page 24 Construction General Permit TPDES General Permit TXR150000 2. The SWP3 must clearly indicate which operator is responsible for satisfying each shared requirement of the SWP3. If the responsibility for satisfying a requirement is not described in the plan,then each permittee is entirely responsible for meeting the requirement within the boundaries of the construction site where they perform construction activities. The SWP3 must clearly describe responsibilities for meeting each requirement in shared or common areas. 3. The SWP3 may provide that one operator is responsible for preparation of a SWP3 in compliance with the CGP,and another operator is responsible for implementation of the SWP3 at the project site. Section B. Responsibilities of Operators 1. Secondary Operators and Primary Operators with Control Over Construction Plans and Specifications All secondary operators and primary operators with control over construction plans and specifications shall. (a) ensure the project specifications allow or provide that adequate BMPs are developed to meet the requirements of Part III of this general permit; (b) ensure that the SWP3 indicates the areas of the project where they have control over project specifications,including the ability to make modifications in specifications, (c) ensure that all other operators affected by modifications in project specifications are notified in a timely manner so that those operators may modify their BMP s as necessary to remain compliant with the conditions of this general permit;and (d) ensure that the SWP3 for portions of the project where they are operators indicates the name and site-specific TPDES authorization number(s)for operators with the day-to-day operational control over those activities necessary to ensure compliance with the SWP3 and other permit conditions. If the party with day-to-day operational control has not been authorized or has abandoned the site,the person with control over project specifications is considered to be the responsible party until the authority is transferred to another party and the SWP3 is updated. 2. Primary Operators with Day-to-Day Operational Control Primary operators with day-to-day operational control of those activities at a project that are necessary to ensure compliance with an SWP3 and other permit conditions must ensure that the SWP3 accomplishes the following requirements: (a) meets the requirements of this general permit for those portions of the project where they are operators; (b) identifies the parties responsible for implementation of BMPs described in the SWP3, (c) indicates areas of the project where they have operational control over day-to-day activities, and (d) includes,for areas where they have operational control over day-to-day activities,the name and site-specific TPDES authorization number of the parties with control over project specifications,including the ability to make modifications in specifications. Section C. Deadlines for SWP3 Preparation,Implementation,and Compliance The SWP3 must be prepared prior to obtaining authorization under this general permit, and implemented prior to commencing construction activities that result in soil Page 25 Construction General Permit TPDES General Permit TXR15o0o0 disturbance. The SWP3 must be prepared so that it provides for compliance with the terms and conditions Of this general permit. Section D. Plan Review and Making Plans Available 1. The SWP3 must be retained on-site at the construction site or,if the site is inactive or does not have an on-site location to store the plan,a notice must be posted describing the location of the SWP3. The SWP3 must be made readily available at the time of an on-site inspection to: the executive director;a federal,state,or local agency approving sediment and erosion plans,grading plans,or stormwater management plans;local government officials,and the operator of a municipal separate storm sewer receiving discharges from the site. If the SWP3 is retained off-site,then it shall be made available as soon as reasonably possible. In most instances,it is reasonable that the SWP3 shall be made available within 24 hours of the request. 2. A primary operator of a large construction activity must post the TCEQ site notice near the main entrance of the construction site. An operator of a small construction activity seeking authorization under this general permit and a secondary operator of a large construction activity must post the TCEQ site notice required in Part II.E.i., 2.,or 3.of this general permit in order to obtain authorization. If the construction project is a linear construction project,such as a pipeline or highway,the notices must be placed in a publicly accessible location near where construction is actively underway Notices for these linear sites may be relocated,as necessary,along the length of the project.The notices must be readily available for viewing by the general public;local,state, and federal authorities; and contain the following information. (a) the site-specific TPDES authorization number for the project if assigned, (b) the operator name,contact name,and contact phone number; (c) a brief description of the project;and (d)the location of the SWP3. 3. This permit does not provide the general public with any right to trespass on a construction site for any reason,including inspection of a site;.nor does this permit require that permittees allow members of the general public access to a construction site. Section E. Revisions and Updates to SWP3s The permittee must revise or update the SWP3 whenever the following occurs. 1. a change in design,construction,operation,or maintenance that has a significant effect on the discharge of pollutants and that has not been previously addressed in the SWP3, 2. changing site conditions based on updated plans and specifications,new operators, new areas of responsibility,and changes in BMPs;or 3. results of inspections or investigations by site operators,operators of a municipal separate storm sewer system receiving the discharge,authorized TCEQ personnel,or a federal,state or local agency approving sediment and erosion plans indicate the SWP3 is proving ineffective in eliminating or significantly minimizing pollutants in discharges authorized under this general permit. Section F. Contents of SWP3 The SWP3 must include,at a minimum,the information described in this section and must comply with the construction and development effluent guidelines in Part III, Section G of the general permit. Page 26 Construction General Permit TPDES General Permit TXR1500oo 1. A site or project description,which includes the following information. (a) a description of the nature of the construction activity; (b) a list of potential pollutants and their sources; (c) a description of the intended schedule or sequence of activities that will disturb soils for major portions of the site,including estimated start dates and duration of activities; (d) the total number of acres of the entire property and the total number of acres where construction activities will occur,including off-site material storage areas, overburden and stockpiles of dirt, and borrow areas that are authorized under the permittee's NOI, (e) data describing the soil or the quality of any discharge from the site; (f) a map showing the general location of the site(e.g.a portion of a city or county map); (g) a detailed site map(or maps)indicating the following: (i) drainage patterns and approximate slopes anticipated after major grading activities, (ii) areas where soil disturbance will occur; (iii) locations of all controls and buffers,either planned or in place; (iv) locations where temporary or permanent stabilization practices are expected to be used, (v) locations of construction support activities,including off-site activities, that are authorized under the permittee's NOI,including material,waste, borrow,fill,or equipment or chemical storage areas; (vi) surface waters(including wetlands)either at,adjacent,or in close proximity to the site,and also indicating those that are impaired waters; (vii) locations where stormwater discharges from the site directly to a surface water body or a municipal separate storm sewer system, (viii) vehicle wash areas; and (ix) designated points on the site where vehicles will exit onto paved roads(for instance,this applies to construction transition from unstable dirt areas to exterior paved roads). Where the amount of information required to be included on the map would result in a single map being difficult to read and interpret,the operator shall develop a series of maps that collectively include the required information. (h) the location and description of support activities authorized under the permittee's NOI,including asphalt plants,concrete plants,and other activities providing support to the construction site that is authorized under this general permit; (i) the name of receiving waters at or near the site that may be disturbed or that may receive discharges from disturbed areas of the project; (j) a copy of this TPDES general permit; (k) the NOI and acknowledgement certificate for primary operators of large. construction sites,and the site notice for small construction sites and for secondary operators of large construction sites; (1) stormwater and allowable non-stormwater discharge locations,including storm drain inlets on site and in the immediate vicinity of the construction site;and Page 27 Construction General Permit TPDES General Permit TXR150000 (m)locations of all pollutant-generating activities,such as paving operations; concrete,paint and stucco washout and water disposal,solid waste storage and disposal,and dewatering operations. 2. A description of the BMPs that will be used to minimize pollution in runoff. The description must identify the general timing or sequence for implementation. At a minimum,the description must include the following components: (a) General Requirements (i) Erosion and sediment controls must be designed to retain sediment on-site to the extent practicable with,consideration for local topography,soil type, and rainfall. (ii) Control measures must be properly selected,installed,and maintained according to the manufacturer's or designer's specifications. (iii) Controls must be developed to minimize the offsite transport of litter, construction debris,and construction materials. (b) Erosion Control and Stabilization Practices The SWP3 must include a description of temporary and permanent erosion control and stabilization practices for the site,compliant with the requirements of Part III.G.1 and G.2 of this general permit,including a schedule of when the practices will be implemented.Site plans should ensure that existing vegetation is preserved where it is possible. (i) Erosion control and stabilization practices may include but are not limited to: establishment of temporary or permanent vegetation,mulching, geotextiles,sod stabilization,vegetative buffer strips,protection of existing trees and vegetation,slope texturing,temporary velocity dissipation devices,flow diversion mechanisms, and other similar measures. (ii) The following records must be maintained and either attached to or referenced in the SWP3,and made readily available upon request to the parties listed in Part III.D.1 of this general permit: (A) the dates when major grading activities occur; (B) the dates when construction activities temporarily or permanently cease on a portion of the site; and (C) the dates when stabilization measures are initiated. (iii) Erosion control and stabilization measures must be initiated immediately in portions of the site where construction activities have temporarily ceased and will not resume for a period exceeding 14 calendar days. Stabilization measures that provide a protective cover must be initiated immediately in portions of the site where construction activities have permanently ceased. The term"immediately"is used to define the deadline for initiating stabilization measures.In the context of this requirement,"immediately"means as soon as practicable,but no later than the end of the next work day,following the day when the earth-disturbing activities have temporarily or permanently ceased. Except as provided in (A)through(D)below,these measures must be completed as soon as practicable,but no more than 14 calendar days after the initiation of soil stabilization measures: (A) Where the immediate initiation of stabilization measures after construction activity temporarily or permanently ceased is precluded Page 28 Construction General Permit TPDES General Permit TXRI50000 by snow cover or frozen ground conditions,stabilization measures must be initiated as soon as practicable. (B) In arid areas,semi-arid areas,or drought-stricken areas where the immediate initiation of stabilization measures after construction activity has temporarily or permanently ceased or is precluded by arid conditions,erosion control and stabilization measures must be initiated as soon as practicable. Where vegetative controls are not feasible due to arid conditions,the operator shall immediately install, and within 14 calendar days of a temporary or permanent cessation of work in any portion of the site complete,non-vegetative erosion controls. If non-vegetative controls are not feasible,the operator shall install temporary sediment controls as required in Paragraph(C) below (C) In areas where temporary stabilization measures are infeasible,the operator may alternatively utilize temporary perimeter controls. The operator must document in the SWP3 the reason why stabilization measures are not feasible,and must demonstrate that the perimeter controls will retain sediment on site to the extent practicable. The operator must continue to inspect the BMPs at the frequency established in Section III.F 7.(a)for unstabilized sites. (D) If the initiation or completion of vegetative stabilization is affected by circumstances beyond the control of the permittee,vegetative stabilization must be initiated or completed as soon as conditions or circumstances allow it on the site. The requirement to initiate stabilization is triggered as soon as it is known with reasonable certainty that work will be stopped for 14 or more additional calendar days. (iv) Final stabilization must be achieved prior to termination of permit coverage. (v) TCEQ does not expect that temporary or permanent stabilization measures to be applied to areas that are intended to be left un-vegetated or un- stabilized following construction(e.g.,dirt access roads,utility pole pads, areas being used for storage of vehicles,equipment,or materials). (c) Sediment Control Practices The SWP3 must include a description of any sediment control practices used to remove eroded soils from stormwater runoff,including the general timing or sequence for implementation of controls. (i) Sites With Drainage Areas of Ten or More Acres (A) Sedimentation Basin(s) (i) A sedimentation basin is required,where feasible,for a common drainage location that serves an area with ten(1o)or more acres disturbed at one time. A sedimentation basin may be temporary or permanent,and must provide sufficient storage to contain a calculated volume of runoff from a 2-year,24-hour storm from each disturbed acre drained. When calculating the volume of runoff from a 2-year,24-hour storm event,it is not required to include the flows from offsite areas and flow from onsite areas that are either undisturbed or have already undergone permanent stabilization,if these flows are diverted around both the disturbed areas of the site and the sediment basin.Capacity calculations shall be included in the SWP3. Page 29 Construction General Permit TPDES General Permit TXR150000 (2) Where rainfall data is not available or a calculation cannot be performed,the sedimentation basin must provide at least 3,600 cubic feet of storage per acre drained until final stabilization of the site. (3) If a sedimentation basin is not feasible,then the permittee shall provide equivalent control measures until final stabilization of the site. In determining whether installing a sediment basin is feasible,the permittee may consider factors such as site soils, slope,available area,public safety,precipitation patterns,site geometry,site vegetation,infiltration capacity,geotechnical factors,depth to groundwater,and other similar considerations. The permittee shall document the reason that the sediment basins are not feasible,and shall utilize equivalent control measures, which may include a series of smaller sediment basins. (4) Unless infeasible,when discharging from sedimentation basins and impoundments,the permittee shall utilize outlet structures that withdraw water from the surface. (B) Perimeter Controls. At a minimum,silt fences,vegetative buffer strips,or equivalent sediment controls are required for all down slope boundaries of the construction area, and for those side slope boundaries deemed appropriate as dictated by individual site conditions. (ii) Controls for Sites With Drainage Areas Less than Ten Acres. (A) Sediment traps and sediment basins may be used to control solids in stormwater runoff for drainage locations serving less than ten(io) acres. At a minimum,silt fences,vegetative buffer strips,or equivalent sediment controls are required for all down slope boundaries of the construction area,and for those side slope boundaries deemed appropriate as dictated by individual site conditions. (B) Alternatively,a sediment basin that provides storage for a calculated volume of runoff from a 2-year,24-hour storm from each disturbed acre drained may be utilized. Where rainfall data is not available or a calculation cannot be performed,a temporary or permanent sediment basin providing 3,60o cubic feet of storage per acre drained may be provided. If a calculation is performed,then the calculation shall be included in the SWP3. (C) If sedimentation basins or impoundments are used,the permittee shall comply with the requirements in Part III.G 6 of this general permit. 3. Description of Permanent Stormwater Controls A description of any measures that will be installed during the construction process to control pollutants in stormwater discharges that may occur after construction operations have been completed must be included in the SWP3. Permittees are only responsible for the installation and maintenance of stormwater management measures prior to final stabilization of the site or prior to submission of an NOT 4. Other Required Controls and BMPs (a) Permittees shall minimize,to the extent practicable,the off-site vehicle tracking of sediments and the generation of dust. The SWP3 shall include a description of controls utilized to accomplish this requirement. Page 30 Construction General Permit TPDES General Permit TXRI5d000 (b) The SWP3 must include a description of construction and waste materials expected to be stored on-site and a description of controls to minimize pollutants from these materials. (c) The SWP3 must include a description of potential pollutant sources from areas other than construction(such as stormwater discharges from dedicated asphalt plants and dedicated concrete batch plants),and a description of controls and measures that will be implemented,at those sites to minimize pollutant discharges. (d) Permittees shall place velocity dissipation devices at discharge locations and along the length of any outfall channel(i.e.,runoff conveyance)to provide a non- erosive flow velocity from the structure to a water course,so that the natural physical and biological characteristics and functions are maintained and protected. (e) Permittees shall design and utilize appropriate controls to minimize the offsite transport of suspended sediments and other pollutants if it is necessary to pump or channel standing water from the site. (f) Permittees shall ensure that all other required controls and BMPs comply with all of the requirements of Part III.G of this general permit. 5. Documentation of Compliance with Approved State and Local Plans (a) Permittees must ensure that the SWP3 is consistent with requirements specified in applicable sediment and erosion site plans or site permits,or stormwater management site plans or site permits approved by federal,state,or local officials. (b) SWP3s must be updated as necessary to remain consistent with any changes applicable to protecting surface water resources in sediment erosion site plans or site permits,or stormwater management site plans or site permits approved by state or local official for which the permittee receives written notice. (c) If the permittee is required to prepare a separate management plan,including but not limited to a WPAP or Contributing Zone Plan in accordance with 3o TAC Chapter 213(related to the Edwards Aquifer),then a copy of that plan must be either included in the SWP3 or made readily available upon request to authorized personnel of the TCEQ. The permittee shall maintain a copy of the approval letter for the plan in its SWP3. 6. Maintenance Requirements (a) All protective measures identified in the SWP3 must be maintained in effective operating condition. If,through inspections or other means,the permittee determines that BMPs are not operating effectively,then the perniittee shall perform maintenance as necessary to maintain the continued effectiveness of stormwater controls,and prior to the next rain event if feasible. If maintenance prior to the next anticipated storm event is impracticable,the reason shall be documented in the SWP3 and maintenance must be scheduled and accomplished as soon as practicable. Erosion and sediment controls that have been intentionally disabled,run-over,removed,or otherwise rendered ineffective must be replaced or corrected immediately upon discovery (b) If periodic inspections or other information indicates a control has been used incorrectly,is performing inadequately,or is damaged,then the operator shall replace or modify the control as soon as practicable after making the discovery (c) Sediment must be removed from sediment traps and sedimentation ponds no , later than the time that design capacity has been reduced by 5o%. For perimeter Page 31 Construction General Permit TPDES General Permit TXRi50000 controls such as silt fences,berms,etc.,the trapped sediment must be removed before it reaches 5o%of the above-ground height. (d) If sediment escapes the site,accumulations must be removed at a frequency that minimizes off-site impacts,and prior to the next rain event,if feasible. If the permittee does not own or operate the off-site conveyance,then the permittee shall work with the owner or operator of the property to remove the sediment. 7 Inspections of Controls (a) Personnel provided by the permittee must inspect disturbed areas of the construction site that have not been finally stabilized,areas used for storage of materials that are exposed to precipitation,discharge locations,and structural controls for evidence of,or the potential for,pollutants entering the drainage system. Personnel conducting these inspections must be knowledgeable of this general permit,familiar with the construction site,and knowledgeable of the SWP3 for the site. Sediment and erosion control measures identified in the SWP3 must be inspected to ensure that they are operating correctly Locations where vehicles enter or exit the site must be inspected for evidence of off-site sediment tracking. Inspections must be conducted at least once every 14 calendar days and within 24 hours of the end of a storm event of o.5 inches or greater Where sites have been finally or temporarily stabilized or where runoff is unlikely due to winter conditions(e.g.site is covered with snow,ice,or frozen ground exists),inspections must be conducted at least once every month. In arid,semi-arid,or drought-stricken areas,inspections must be conducted at least once every month and within 24 hours after the end of a storm event of o.5 inches or greater The SWP3 must also contain a record of the total rainfall measured,as well as the approximate beginning and ending dates of winter or drought conditions resulting in monthly frequency of inspections. As an alternative to the above-described inspection schedule of once every 14 calendar days and within 24 hours of a storm event of o.5 inches or greater,the SWP3 may be developed to require that these inspections will occur at least once every seven(7)calendar days. If this alternative schedule is developed,then the inspection must occur regardless of whether or not there has been a rainfall event since the previous inspection. The inspections may occur on either schedule provided that the SWP3 reflects the current schedule and that any changes to the schedule are conducted in accordance with the following provisions: the schedule may be changed a maximum of one time each month,the schedule change must be implemented at the beginning of a calendar month,and the reason for the schedule change must be documented in the SWP3(e.g.,end of"dry"season and beginning of"wet" season). (b) Utility line installation,pipeline construction,and other examples of long, narrow,linear construction activities may provide inspection personnel with limited access to the areas described in Part III.F 7.(a)above. Inspection of these areas could require that vehicles compromise temporarily or even permanently stabilized areas,cause additional disturbance of soils,and increase the potential for erosion. In these circumstances,controls must be inspected at least once every 1.4 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater,but representative inspections may be performed. For representative inspections,personnel must inspect controls along the construction site for o.25 mile above and below each access point where a roadway,undisturbed right-of-way,or other similar feature intersects the construction site and allows access to the areas described in Part III.F 7.(a) Page 32 Construction General Permit TPDES General Permit TXR150000 above. The conditions of the controls along each inspected o.25 mile portion may be considered as representative of the condition of controls along that reach extending from the end of the o.25 mile portion to either the end of the next o.25 mile inspected portion,or to the end of the project;whichever occurs first. As an alternative to the above-described inspection schedule of once every 14 calendar days.and within 24 hours of a storm event of 0.5 inches or greater,the SWP3 may be developed to require that these inspections will occur at least once every seven(7)calendar days. If this alternative schedule is developed,the inspection must occur regardless of whether or not there has been a rainfall event since the previous inspection. The inspections may occur on either schedule provided that the SWP3 reflects the current schedule and that any changes to the schedule are conducted in accordance with the following provisions: the schedule may be changed a maximum of one time each month, the schedule change must be implemented at the beginning of a calendar month, and the reason for the schedule change must be documented in the SWP3(e.g., end of"dry"season and beginning of"wet"season). (c) In the event of flooding or other uncontrollable situations which prohibit access to the inspection sites,inspections must be conducted as soon as access is practicable. (d) The SWP3 must be modified based on the results of inspections,as necessary,to better control pollutants in runoff. Revisions to the SWP3 must be completed within seven(7)calendar days following the inspection. If existing BMPs are modified or if additional BMPs are necessary,an implementation schedule must be described in the SWP3 and wherever possible those changes implemented before the next storm event. If implementation before the next anticipated storm event is impracticable,these changes must be implemented as soon as practicable. (e) A report summarizing the scope of the inspection,the date(s)of the inspection, and major observations relating to the implementation of the SWP3 must be made and retained as part of the SWP3. Major observations should include: The locations of discharges of sediment or other pollutants from the site; locations of BMPs that need to be maintained,locations of BMPs that failed to operate as designed or proved inadequate for a particular location, and locations where additional BMPs are needed. Actions taken as a result of inspections must be described within,and retained as a part of,the SWP3. Reports must identify any incidents of non-compliance. Where a report does not identify any incidents of non-compliance,the report must contain a certification that the facility or site is in compliance with the SWP3 and this permit. The report must be signed by the person and in the manner required by 3o TAC§305.128(relating to Signatories to Reports). The names and qualifications of personnel making the inspections for the permittee may be documented once in the SWP3 rather than being included in each report. 8. The SWP3 must identify and ensure the implementation of appropriate pollution prevention measures for all eligible non-stormwater components of the discharge,as listed in Part II.A.3.of this permit. 9. The SWP3 must include the information required in Part III.B.of this general permit. 10. The SWP3 must include pollution prevention procedures that comply with Part III.G.4 of this general permit. Page 33 Construction General Permit TPDES General Permit TXR150000 Section G. Erosion and Sediment Control Requirements Applicable to All Sites Except as provided in 40 CFR§§125.3o-125.32,any discharge regulated under this general permit,with the exception of sites that obtained waivers based on low rainfall erosivity,must achieve,at a minimum,the following effluent limitations representing the degree of effluent reduction attainable by application of the best practicable control technology currently available(BPT). 1. Erosion and sediment controls.Design,install,and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants.At a minimum,such controls must be designed,installed,and maintained to: (a) Control stormwater volume and velocity within the site to minimize soil erosion, (b) If any stormwater flow will be channelized at the site,stormwater controls must be designed to control both peak flowrates and total stormwater volume to minimize erosion at outlets and to minimize downstream channel and streambank erosion, (c) Minimize the amount of soil exposed during construction activity; (d) Minimize the disturbance of steep slopes; (e) Minimize sediment discharges from the site.The design,installation,and maintenance of erosion and sediment controls must address factors such as the amount,frequency,intensity and duration of precipitation,the nature of resulting stormwater runoff,and soil characteristics,including the range of soil particle sizes expected to be present on the site; (f) If earth disturbance activities are located in close proximity to a surface water, provide and maintain appropriate natural buffers if feasible and as necessary, around surface waters,depending on site-specific topography,sensitivity,and proximity to water bodies. Direct stormwater to vegetated areas to increase sediment removal and maximize stormwater infiltration. If providing buffers is infeasible, the permittee shall document the reason that natural buffers are not feasible,and shall implement additional erosion and sediment controls to reduce sediment load, (g) Preserve native topsoil at the site,unless infeasible; and (h) Minimize soil compaction in post-construction pervious areas. In areas of the construction site where final vegetative stabilization will occur or where infiltration practices will be installed,either- (i) restrict vehicle and equipment use to avoid soil compaction,or (2) prior to seeding or planting areas of exposed soil that have been compacted, use techniques that condition the soils to support vegetative growth,if necessary and feasible; (i) TCEQ does not consider stormwater control features(e.g.,stormwater conveyance channels,storm drain inlets,sediment basins)to constitute"surface waters"for the purposes of triggering the buffer requirement in Part III.G.(f) above. 2. Soil stabilization.Stabilization of disturbed areas must,at a minimum,be initiated immediately whenever any clearing,grading,excavating,or other earth disturbing activities have permanently ceased on any portion of the site,or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. In the context of this requirement,"immediately"means as soon as practicable, but no later than the end of the next work day,following the day when the earth- disturbing activities have temporarily or permanently ceased. Temporary Page 34 Construction General Permit TPDES General Permit TXRi50000 stabilization must be completed no more than 14 calendar days after initiation of soil stabilization measures,and fmal stabilization must be achieved prior to termination of permit coverage. In arid,semi-arid,and drought-stricken areas where initiating vegetative stabilization measures immediately is infeasible,alternative non- vegetative stabilization measures must be employed as soon as practicable.Refer to Part III.F.2.(b)for complete erosion control and stabilization practice requirements. 3. Dewatering Discharges from dewatering activities,including discharges from dewatering of trenches and excavations,are prohibited,unless managed by appropriate controls. 4. Pollution prevention measures.Design,install,implement,and maintain effective pollution prevention measures to minimize the discharge of pollutants.At a minimum,such measures must be designed,installed,implemented,and maintained to• (a) Minimize the discharge of pollutants from equipment and vehicle washing,wheel wash water,and other wash waters.Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge; (b) Minimize the exposure of building materials,building products,construction wastes,trash,landscape materials,fertilizers,pesticides,herbicides,detergents, sanitary waste,and other materials present on the site to precipitation and to stormwater;and (c) Minimize the discharge of pollutants from spills and leaks,and implement chemical spill and leak prevention and response procedures. 5. Prohibited discharges.The following discharges are prohibited. (a) Wastewater from wash out of concrete trucks,unless managed by an appropriate control(see Part V of the general permit); (b)Wastewater from wash out and cleanout of stucco,paint,form release oils,curing compounds and other construction materials; (c) Fuels,oils,or other pollutants used in vehicle and equipment operation and maintenance;and (d) Soaps or solvents used in vehicle and equipment washing. 6. Surface outlets.When discharging from basins and impoundments,utilize outlet structures that withdraw water from the surface,unless infeasible. Part IV. Stormwater Runoff from Concrete Batch Plants Discharges of stormwater runoff from concrete batch plants at regulated construction sites may be authorized under the provisions of this general permit provided that the following requirements are met for concrete batch plant(s)authorized under this permit. If discharges of stormwater runoff from concrete batch plants are not covered under this general permit, then discharges must be authorized under an alternative general permit or individual permit. This permit does not authorize the discharge or land disposal of any wastewater from concrete batch plants at regulated construction sites. Authorization for these wastes must be obtained under'an individual permit or an alternative general permit. Section A. Benchmark Sampling Requirements 1. Operators of concrete batch plants authorized under this general permit shall sample the stormwater runoff from the concrete batch plants according to the requirements Page 35 Construction General Permit TPDES General Permit TXR150000 of this section of this general permit, and must conduct evaluations on the effectiveness of the SWP3 based on the following benchmark monitoring values: Table 1.Benchmark Parameters Benchmark Benchmark Value Sampling Sample Type Parameter Frequency Oil and Grease 15 mg/L 1/quarter(*1) (*2) Grab(*3) Total Suspended 10o mg/L 1/quarter(*1) (*2) Grab(*3) Solids pH 6.o—9.o Standard 1/quarter(*1)(*2) Grab(*3) Units Total Iron 1.3 mg/L 1/quarter(*1) (*2) Grab(*3) (*1) When discharge occurs. Sampling is required within the first 3o minutes of discharge. If it is not practicable to take the sample,or to complete the sampling,within the first 3o minutes,sampling must be completed within the first hour of discharge. If sampling is not completed within the first 30 minutes of discharge,the reason must be documented and attached to all required reports and records of the sampling activity (*2) Sampling must be conducted at least once during each of the following periods. The first sample must be collected during the first full quarter that a stormwater discharge occurs from a concrete batch plant authorized under this general permit. January through March April through June July through September October through December For projects lasting less than one full quarter,a minimum of one sample shall be collected,provided that a stormwater discharge occurred at least once following submission of the NOI or following the date that automatic authorization was obtained under Section II.E.2.,and prior to terminating coverage. (*3) A grab sample shall be collected from the stormwater discharge resulting from a storm event that is at least o.1 inches of measured precipitation that occurs at least 72 hours from the previously measurable storm event. The sample shall be collected downstream of the concrete batch plant,and where the discharge exits any BMPs utilized to handle the runoff from the batch plant,prior to commingling with any other water authorized under this general permit. 2. The permittee must compare the results of sample analyses to the benchmark values above,and must include this comparison in the overall assessment of the SWP3's effectiveness. Analytical results that exceed a benchmark value are not a violation of this permit,as these values are not numeric effluent limitations. Results of analyses are indicators that modifications of the SWP3 should be assessed and may be necessary to protect water quality The operator must investigate the cause for each exceedance and must document the results of this investigation in the SWP3 by the end of the quarter following the sampling event. Page 36 Construction General Permit TPDES General Permit TXR150000 The operator's investigation must identify the following: (a) any additional potential sources of pollution,such as spills that might have occurred, (b) necessary revisions to good housekeeping measures that are part of the SWP3, (c) additional BMPs,including a schedule to install or implement the BMPs,and (d) other parts of the SWP3 that may require revisions in order to meet the goal of the benchmark values. Background concentrations of specific pollutants may also be considered during the investigation. If the operator is able to relate the cause of the exceedance to background concentrations,then subsequent exceedances of benchmark values for that pollutant maybe resolved by referencing earlier findings in the SWP3. Background concentrations may be identified by laboratory analyses of samples of stormwater runon to the permitted facility,by laboratory analyses of samples of stormwater run-off from adjacent non-industrial areas,or by identifying the pollutant is a naturally occurring material in soils at the site. Section B. Best Management Practices(BMPs) and SWP3 Requirements Minimum SWP3 Requirements—The following are required in addition to other SWP3 requirements listed in this general permit(including,but not limited to Part III.F 7 of this permit). 1. Description of Potential Pollutant Sources-The SWP3 must provide a description of potential sources(activities and materials)that may reasonably be expected to affect the quality of stormwater discharges associated with concrete batch plants authorized under this permit. The SWP3 must describe practices that that will be used to reduce the pollutants in these discharges to assure compliance with this general permit, including the protection of water quality,and must ensure the implementation of these practices. The following must be developed,at a minimum,in support of developing this description. (a) Drainage—The site map must include the following information. (1) the location of all outfalls for stormwater discharges associated with concrete batch plants that are authorized under this permit; (2) a depiction of the drainage area and the direction of flow to the outfall(s); (3) structural controls used within the drainage area(s), (4) the locations of the following areas associated with concrete batch plants that are exposed to precipitation.vehicle and equipment maintenance activities(including fueling,repair,and storage areas for vehicles and equipment scheduled for maintenance); areas used for the treatment, storage,or disposal of wastes;liquid storage tanks;material processing and storage areas;and loading and unloading areas,and (5) the locations of the following:any bag house or other dust control device(s);recycle/sedimentation pond,clarifier or other device used for the treatment of facility wastewater(including the areas that drain to the treatment device); areas with significant materials; and areas where major spills or leaks have occurred. (b) Inventory of Exposed Materials—A list of materials handled at the concrete batch plant that maybe exposed to stormwater and that have a potential to Page 37 Construction General Permit TPDES General Permit TXR150000 affect the quality of stormwater discharges associated with concrete batch plants that are authorized under this general permit. (c) Spills and Leaks-A list of significant spills and leaks of toxic or hazardous pollutants that occurred in areas exposed to stormwater and that drain to stormwater outfalls associated with concrete batch plants authorized under this general permit must be developed,maintained,and updated as needed. (d) Sampling Data-A summary of existing stormwater discharge sampling data must be maintained,if available. 2. Measures and Controls-The SWP3 must include a description of management controls to regulate pollutants identified in the SWP3's"Description of Potential Pollutant Sources"from Part IV.B.1.(a)of this permit,and a schedule for implementation of the measures and controls. This must include,at a minimum. (a) Good Housekeeping-Good housekeeping measures must be developed and implemented in the area(s)associated with concrete batch plants. (1) Operators must prevent or minimize the discharge of spilled cement, aggregate(including sand or gravel),settled dust,or other significant materials from paved portions of the site that are exposed to stormwater Measures used to minimize the presence of these materials may include regular sweeping or other equivalent practices. These practices must be conducted at a frequency that is determined based on consideration of the amount of industrial activity occurring in the area and frequency of precipitation,and shall occur at least once per week when cement or aggregate is being handled or otherwise processed in the area. (2) Operators must prevent the exposure of fine granular solids,such as cement,to stormwater Where practicable,these materials must be stored in enclosed silos,hoppers or buildings,in covered areas,or under covering. (b) Spill Prevention and Response Procedures-Areas where potential spills that can contribute pollutants to stormwater runoff,and the drainage areas from these locations,must be identified in the SWP3. Where appropriate,the SWP3 must specify material handling procedures,storage requirements,and use of equipment. Procedures for cleaning up spills must be identified in the SWP3 and made available to the appropriate personnel. (c) Inspections-Qualified facility personnel(i.e.,a person or persons with knowledge of this general permit,the concrete batch plant,and the SWP3 related to the concrete batch plant(s)for the site)must be identified to inspect designated equipment and areas of the facility specified in the SWP3.The inspection frequency must be specified in the SWP3 based upon a consideration of the level of concrete production at the facility,but must be a minimum of once per month while the facility is in operation.The inspection must take place while the facility is in operation and must,at a minimum,include all areas that are exposed to stormwater at the site,including material handling areas,above ground storage tanks,hoppers or silos,dust collection/containment systems, truck wash down and equipment cleaning areas. Follow-up procedures must be used to ensure that appropriate actions are taken in response to the inspections. Records of inspections must be maintained and be made readily available for inspection upon request. (d) Employee Training-An employee training program must be developed to educate personnel responsible for implementing any component of the SWP3, or personnel otherwise responsible for stormwater pollution prevention,with the provisions of the SWP3. The frequency of training must be documented in Page 38 Construction General Permit TPDES General Permit TXR150000 the SWP3,and at a minimum,must consist of one training prior to the initiation of operation of the concrete batch plant. (e) Record Keeping and Internal Reporting Procedures-A description of spills and similar incidents,plus additional information that is obtained regarding the quality and quantity of stormwater discharges,must be included in the SWP3. Inspection and maintenance activities must be documented and records of those inspection and maintenance activities must be incorporated in the SWP3. (f) Management of Runoff--The SWP3 shall contain a narrative consideration for reducing the volume of runoff from concrete batch plants by diverting runoff or otherwise managing runoff,including use of infiltration,detention ponds, retention ponds,or reusing of runoff. 3. Comprehensive Compliance Evaluation—At least once per year,one or more qualified personnel(i.e.,a person or persons with knowledge of this general permit, the concrete batch plant,and the SWP3 related to the concrete batch plant(s)for the site)shall conduct a compliance evaluation of the plant. The evaluation must include the following. (a) Visual examination of all areas draining stormwater associated with regulated concrete batch plants for evidence of,or the potential for,pollutants entering the drainage system. These include but are not limited to: cleaning areas, material handling areas,above ground storage tanks,hoppers or silos,dust collection/containment systems,and truck wash down and equipment cleaning areas. Measures implemented to reduce pollutants in runoff(including structural controls and implementation of management practices)must be evaluated to determine if they are effective and if they are implemented in accordance with the terms of this permit and with the permittee's SWP3. The operator shall conduct a visual inspection of equipment needed to implement the SWP3,such as spill,response equipment. (b) Based on the results of the evaluation,the following must be revised as appropriate within two weeks of the evaluation. the description of potential pollutant sources identified in the SWP3(as required in Part W.B.i., "Description of Potential Pollutant Sources"),and pollution prevention measures and controls identified in the SWP3(as required in Part IV.B.2., "Measures and Controls"). The revisions may include a schedule for implementing the necessary changes. (c) The permittee shall prepare and include in the SWP3 a report summarizing the scope of the evaluation,the personnel making the evaluation,the date(s)of the evaluation,major observations relating to the implementation of the SWP3,and actions taken in response to the findings of the evaluation. The report must identify any incidents of noncompliance. Where the report does not identify incidences of noncompliance,the report must contain a statement that the evaluation did not identify any incidence(s),and the report must be signed according to 3o TAC§305.1.28,relating to Signatories to Reports. (d) The Comprehensive Compliance Evaluation may substitute for one of the required inspections delineated in Part IV.B.2.(c)of this general permit. Section C. Prohibition of Wastewater Discharges Wastewater discharges associated with concrete production including wastewater disposal by land application are not authorized under this general permit. These wastewater discharges must be authorized under an alternative TCEQ water quality permit or otherwise disposed of in an authorized manner Discharges of concrete truck wash out at construction sites may be authorized if conducted in accordance with the requirements of Part V of this general permit. Page 39 Construction General Permit TPDES General Permit TXR150000 Part V. Concrete Truck Wash Out Requirements This general permit authorizes the wash out of concrete trucks at construction sites regulated under Sections II.E.1.,2.,and 3.of this general permit,provided the following requirements are met. Authorization is limited to the land disposal of wash out water from concrete trucks. Any other direct discharge of concrete production waste water must be authorized under a separate TCEQ general permit or individual permit. 1. Direct discharge of concrete truck wash out water to surface water in the state, including discharge to storm sewers,is prohibited by this general permit. 2. Concrete truck wash out water shall be discharged to areas at the construction site where structural controls have been established to prevent direct discharge to surface waters,or to areas that have a minimal slope that allow infiltration and filtering of wash out water to prevent direct discharge to surface waters. Structural controls may consist of temporary berms,temporary shallow pits,temporary storage tanks with slow rate release,or other reasonable measures to prevent runoff from the construction site. 3. Wash out of concrete trucks during rainfall events shall be minimized. The direct discharge of concrete truck wash out water is prohibited at all times,and the operator shall insure that its BMPs are sufficient to prevent the discharge of concrete truck wash out as the result of rainfall or stormwater runoff. 4. The discharge of wash out water must not cause or contribute to groundwater contamination. 5. If a SWP3 is required to be implemented,the SWP3 shall include concrete wash out areas on the associated,site map. Part VI. Retention of Records The permittee must retain the following records for a minimum period of three(3)years from the date that a NOT is submitted as required by Part II.E.3. For activities in which an NOT is not required,records shall be retained for a minimum period of three(3)years from the date that the operator terminates coverage under Section II.F.3.of this permit. Records include: 1. A copy of the SWP3, 2. All reports and actions required by this permit,including a copy of the construction site notice; 3. All data used to complete the NOI,if an NOI is required for coverage under this general permit; and 4. All records of submittal of forms submitted to the operator of any MS4 receiving the discharge and to the secondary operator of a large construction site,if applicable. Part VII. Standard Permit Conditions 1. The permittee has a duty to comply with all permit conditions. Failure to comply with any permit condition is a violation of the permit and statutes under which it was issued,and is grounds for enforcement action,for terminating,revoking,or denying coverage under this general permit,or for requiring a discharger to apply for and obtain an individual TPDES permit. 2. Authorization under this general permit may be suspended or revoked for cause. Filing a notice of planned changes or anticipated non-compliance by the permittee does not stay any permit condition. The permittee must furnish to the executive director,upon request and within a reasonable time,any information necessary for the executive director to determine whether cause exists for revoking,suspending,or Page 40 Construction General Permit TPDES General Permit TXR150000 terminating authorization under this permit. Additionally,the permittee must provide to the executive director;upon request,copies of all records that the permittee is required to maintain as a condition of this general permit. 3. It is not a defense for a discharger in an enforcement action that it would have been necessary to halt or reduce the permitted activity to maintain compliance with the permit conditions. 4. Inspection and entry shall be allowed under TWC Chapters 26-28,Texas Health and Safety Code§§361.032-361.033 and 361.037,and 40 CFR§122.41(i).The statement in TWC§26.014 that commission entry of a facility shall occur according to an establishment's rules and regulations concerning safety,internal security,and fire protection is not grounds for denial or restriction of entry to any part of the facility or site,but merely describes the commission's duty to observe appropriate rules and regulations during an inspection. 5. The discharger is subject to administrative,civil,and criminal penalties,as applicable,under TWC Chapter 7 for violations including but not limited to the following: (a) negligently or knowingly violating the federal CWA§§3ot,302,306,307,308, 318,or 405,or any condition or limitation implementing any sections in a permit issued under CWA§402,or any requirement imposed in a pretreatment program approved under CWA§§4o2(a)(3)or 4o2(b)(8); (b) knowingly making any false statement,representation,or certification in any record or other document submitted or required to be maintained under a permit,including monitoring reports or reports of compliance or noncompliance;and (c) knowingly violating§303 of the federal CWA,and placing another person in imminent danger of death or serious bodily injury 6. All reports and other information requested by the executive director must be signed by the person and in the manner required by 3o TAC§305.128(relating to Signatories to Reports). 7 Authorization under this general permit does not convey property or water rights of any sort and does not grant any exclusive privilege. 8. The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this permit that has a reasonable likelihood of adversely affecting human health or the environment. 9. The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control(and related appurtenances)which are installed or used by the permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures.This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of the permit. 10. The permittee shall comply with the reporting requirements in 4o CFR§122.41(1),as applicable. Part VIII. Fees 1. A fee of must be submitted along with the NOI. (a) $325 if submitting a paper NOI,or (b) $225 if submitting an NOI electronically Page 41 Construction General Permit TPDES General Permit TXRi50000 2. Fees are due upon submission of the NOI. An NOI will not be declared administratively complete unless the associated fee has been paid in full. 3. No separate annual fees will be assessed for this general permit. The Water Quality Annual Fee has been incorporated into the NOI fees as described above. Page 42 Construction General Permit TPDES General Permit TXR150000 Appendix A: Automatic Authorization Periods of Low Erosion Potential by County—Eligible Date Ranges Andrews: Nov 15-Apr 3o Ector Nov 15-Apr 30 Archer. Dec. 15-Feb.14 Edwards. Dec. 15-Feb.14 Armstrong: Nov 15-Apr 3o El Paso: Jan.1-Jul.14,or May 15-Jul. Bailey Nov 1-Apr 30,or Nov 15-May 31,or Jun.1-Aug.14,or Jun.15-Sept.14, 14 ,or Jul.1-Oct. 14,or Jul.15-Oct.31,or Aug.1-Apr 30,or Aug.15-May 14,or Baylor Dec.15-Feb. 14 Sept. 1-May 30,or Oct.1-Jun.14,or Borden. Nov 15-Apr 3o Nov 1-Jun.30,or Nov 15-Jul. 14 Brewster Nov 15-Apr 3o Fisher Dec.15-Feb.14 Briscoe: Nov 15-Apr 3o Floyd. Nov 15-Apr 30 Brown. Dec.15-Feb.14 Foard. Dec. 15-Feb.14 Callahan. Dec. 15-Feb.14 Gaines. Nov 15-Apr 30 Carson. Nov 15-Apr 30 Garza. Nov 15-Apr 30 Castro: Nov 15-Apr 3o Glasscock: Nov 15-Apr 30 Childress: Dec. 15-Feb.14 Hale: Nov 15-Apr 30 Cochran. Nov 1-Apr 30,or Nov 15- Hall. Feb. -Mar 30 May 14 Hansford. Nov 15-Apr 30 Coke: Dec.15-Feb.14 Hardeman. Dec.15-Feb. 14 Coleman. Dec. 15-Feb.14 Hartley Nov 15-Apr 30 Collingsworth. Jan. 1-Mar 30,or Dec. 1- Haskell. Dec.15-Feb. 14 Feb. 28 Hockley Nov 1-Apr 14,or Nov 15- Concho: Dec.15-Feb. 14 Apr 30 Cottle: Dec. 15-Feb.14 Howard. Nov 15-Apr 30 Crane: Nov 15-Apr 30 Hudspeth. Nov 1-May 14 Crockett: Nov 15-Jan.14,or Feb.1- Hutchinson. Nov 15-Apr 30 Mar 3° Irion. Dec. -Feb.14 Crosby Nov 15-Apr 30 Jeff Davis: Nov 1-Apr 30 or Nov 15- Culberson. Nov 1-May 14 May 14 Dallam. Nov 1-Apr 14,or Nov 15-Apr Jones. Dec. 15-Feb.14 3° Kent: Nov 15-Jan.14 or Feb.1-Mar 30 Dawson. Nov 15-Apr 3o Kerr Dec.15-Feb.14 Deaf Smith. Nov 15-Apr 3o Kimble: Dec.15-Feb.14 Dickens. Nov 15-Jan.14,or Feb.1-Mar 30 King: Dec.15-Feb.14 Dimmit: Dec.15-Feb.14 Kinney Dec.15-Feb. 14 Donley Jan.1-Mar 30,or Dec.1-Feb. Knox: Dec.15-Feb.14 28 Lamb: Nov 1-Apr 14,or Nov 15-Apr Eastland. Dec.15-Feb.14 3° Page 43 Construction General Permit TPDES General Permit TXRi50000 Loving: Nov 1-Apr 30,or Nov 15-May Scurry Nov 15-Apr 30 14 Shackelford. Dec.15-Feb.14 Lubbock: Nov 15-Apr 3o Sherman. Nov 15-Apr 30 Lynn. Nov 15-Apr 3o Stephens Dec. 15-Feb. 14 Martin. Nov 15-Apr 3o Sterling: Nov 15-Apr 30 Mason. Dec.15-Feb. 14 Stonewall. Dec.15-Feb.14 Maverick: Dec.15-Feb.14 Sutton. Dec. 15-Feb.14 McCulloch. Dec. 15-Feb.14 Swisher Nov 15-Apr 30 Menard. Dec. 15-Feb.14 Taylor Dec.15-Feb.14 Midland. Nov 15-Apr 3o Terrell. Nov 15-Apr 30 Mitchell. Nov 15-Apr 3o Terry Nov 15-Apr 30 Moore: Nov 15-Apr 3o Throckmorton. Dec. 15-Feb.14 Motley Nov 15-Jan. 14,or Feb. 1-Mar Tom Green. Dec.15-Feb.14 30 Nolan. Dec. 15-Feb.14 Upton. Nov 15-Apr 30 Oldham. Nov 15-Apr 3o Uvalde: Dec.15-Feb.14 Parmer Nov 1-Apr 14,or Nov 15-Apr Val Verde: Nov 15-Jan.14,or Feb.1- Mar 30 30 Pecos Nov 15-Apr 3o Ward. Nov 1-Apr 14,or Nov 15-Apr 30 Potter Nov 15-Apr 30 Wichita. Dec. 15-Feb.14 Presidio: Nov 1-Apr 30,or Nov 15- Wilbarger Dec.15-Feb.14 May 14 Randall. Nov 15-Apr 3o Winkler Nov 1-Apr 30,or Nov 15- May 14 Reagan. Nov 15-Apr 3o Yoakum. Nov 1-Apr 30,or Nov 15- Real. Dec.15-Feb.14 May 14 Reeves: Nov 1-Apr 30,or Nov 15-May Young: Dec.15-Feb. 14 14 Wheeler Jan.1-Mar 30,or Dec. 1-Feb. Runnels. Dec.15-Feb.14 28 Schleicher Dec.15-Feb.14 Zavala. Dec. 15-Feb.14 Page 44 Construction General'Permit TPDES General Permit TXRi50000 Appendix B:Erosivity Index(EI)Zones in Texas cr $ - a :a a., ;e e?, el a 1a1 La 14.711: 111&-m �,t�•,a a'es - .S' !VI i'1 o: . - a F9- hh u4a ay:t1! ,•. t •ci ice:..., aeam t 1 s • ti . ROE • •9 A. . .'......,. . -.-:.aM 1!••I1�•�,.Te •, h .-. c - ; e•W -re, ti,=:ia - 1 li, 4`..r, u.9i' :sc 1 - - ,r L - 1! {!'a ',a RRe .'.� 111• '' 4+i, :a1a'.®.�a�cc3,: ,,::, b .. •L a � t'. 17'% ,�. .if.,.`[• A+A � , C,,- i. !1''.. iii, .�.. a ,}®'was. . t.,� c n e r o... II-.v � r P tied�,41 tP .,naa i,i.' s}^�:re i •a p da;' o i..aura ..reya �9F!. 6 �� _ ram +c3 ..•+w k. uu1reu •eo •! Cf4e1 li.$,i'a —�d� -—aaz' a ate, 1r _S -•� l!!•i ..r p' '. ;,'!"a.P 1e $! P, i='-., : .; �. f�„• .t+:'..s-,2r, �` ti ,fir A, '•$:' .,p•a ii 1 a' ! • r 4•' �F r 1�.�`i.- e -...::; .r'S" g,,,l i •E•re:,, aire a.a 0 ili!•'.1B�1 3;6!!^ss ,��.. 16 ;ate u ,.t��-. !! L „� r I '1.]+m"a .t I :. 'isaii.;l.,:. ""- - —Lw.?s..� `. �:•�; '"'9�`;® I �, 4+ a F ,e a e.i'u� 9a �•�+[f,ih .— ..,+ ..:�, ,i 11 .t eeyp®yep .r- rr },. R ® i a ,ri1 a<,Y ',• '. '{I ,y,G' , ! .. ,.3• ,Q �`a. 1 a~5 ! 9 1 1 ■,Lr. -,4 ai. 1.*!---. .tib l4 ! *f••! I , i ra. .4, xre Y t.; a:i 1.99 �,ssyr ::: i8 g.,'`-'-rea i-r a s as •imt4s - — _w..-,�v.l- 4 m ••, -11 al . P.ut Xs..-,-. — :`: +Y:::"7-r .t rre. u.r OA: ,;nu, --,171•17•-'ems' • -a. r• 2 a, - a. a- - a {� < d.-.,r v w •ti „., !e1'a1,A1#' a,a„ .j1.,• ,-�,;,Q•i..•. .''••.... ri' .: I ' - -a,'.., y fir,,., kti. ri,1a1.aa >,f1. .r ®;�n'm ® . •=- 1a- ,o,°, , 1, .i 11", R3I`fq S Y sl .w j �•{.!!. }3'1 i 7 I1 G'r M,P1:i 1`� .t7 IC L�l ©®•1e"�"J' P 0.0 i• t 1•A.S Y-1' �1't�` •,.w i to a ... Lam!G^.„.7�S .,;; f, .... 1 :il ..1 cWA: tiS a !n!i ml'P'r'.1'.a.l,.. „......,....L.,,,,,,, i ®. I! e i. __ �i f 1 W$ ®.,M'�'•'LAI•�"Cl'!� m IA 71 1 I. ni C ' „ , %' {",•t•rs ' ,-4..i,> a1 a,;, :idioms ",t✓or1,si rmso® 7 ���"` ., „� es., ,, ,ilk 'y { ' •,�9 a a bre ij. a',/a,ia,�e�emit1®:ems Q;tca if`,'�'1',..a' 'r; u,l IRN 8 i.l.y ,-•. 1 ,ern ur� t- 1 1 t,,,..' i� '? —=!`imcl— —rl.^_.n, • y.wok�,.. 1. ..,. 0 ,i 1['1 . is ir J111 :: rar"1 •. 111., -.,a:':1 as r a r'.r rei.en aaa l�::r3 rr's1!1al. .• ...• irli i.. �rl r „•'I• ,i e.,, .a l•1t,�i G a 4.111�,.4. i . _ „ I w•rg s_,,,�... •1,11a,. �.i.r • i,'.1at&•ra'•.4-•.,,, . ',®.1c- m•-®®®,' s ..1 __a 1F i• .A- 1:.".L..... n'r •1: +t:,r•a in.;«4,191.s i,1,. ,a+�a®[E®:ac,s,lf♦•O - R .'„I �,, , . ;'a r +r -s m a• •r: -,a®�;of�1 41. .. a. •dlL�i-•r"a. 6'i •l i.1 `; i 1 I E + - n ...Y a. ...bait,ii ..�..•L,'• t', •7,••{`� 7 :c . { 11:1 • r`1 . G e', .G .GW fir.`1 r' .'r-- as •-A1�$'I IAI � I ll•. L,11,1 a.-i.,-r G.saY. 0 OA •I• '• ri • RIB 1 '�.'• � e�0. 1/.. a r ,.. �.•.. R n�.>-+•ter es1!' _ .� ''1 !� / al 1! fl1 RI ..' r n n°r1 1,•,1je"'e`F 5,a'1r1 9�®+—"�,a�if•�a,—• :: ;gin_9 it�p.� 4.9 =' Adapted from Chapter 2 of USDA Agriculture Handbook.7o3. `Predicting Soil Erosion by Water'At Guide to Conservation Planning With the Revised Universal Soil Loss Equation(RUSLE),I"U.S.Department of Agriculture,Agricultural Research Service i Page 45 Construction General Permit TPDES General Permit TXRi50000 Appendix C: Isoerodent Map , Ili 'I II 1111 tiwaroilllt' 'FAirrOr 141W illi li'''''" oarli altrainaitliglrinarriOrillark II"4174 ill 011MPANsitrif rier A litikirAttliiViNalii-aw.. :1710' trait"; • 411 .......limar.k. ,...;,matit _ Eftlitirtir 1 l'ri gt Itc""wi'lliktk A16111,11111111"-aierfirtirwitialmtillimr- IIII040 ' tatnilinlifithirunilatimumplieellimo' ". -2 19 EMI Ili I itillifilaillill ililkimibeitil tr44111" , ANN111111111111ifinliailgtrifilltiViriA :tliria it' . 1 't rmiwinamwarativrii wtrAinstikitgiac it ituratmoviraratirevt1214.1 *gaup-- ,... II, or ,,, j,„,,,,,nuir -6.- i ik 'IPA fr - r 1111' ---11161r-14 1" lartiiNwiwam *Alio "ilk 491,4‘6110 -dtialtd.. - te,„,,,,, 44 Miami wis _-,1 ii.„; if. ,,,,, gi,1.10•"":.:•e"t117141 2°. %lb 11°' ' IgE Ailli tali in iltrair 0 41ritral 1011411- 5.L. ile'3°, ofk. moirei.,..0,4.00,,,,,,,,„,4-7.,..,0,-.0....pr.,., • ear,' ir-";: ' 111111110 witAll. 01- "r6. '....* 1111$111 pirriA4110, iii, - I falai illefelPS' tic% : 1!..-.ig_ ill ilririfill.-1116411% r ' voir . .,.-41,4paoi T?'y..d....:.._ a .i "F,- -— Adapted from Chapter 2 of USDA Agriculture Handbook 703. "Predicting Soil Erosion by Water A Guide to Conservation Planning With the Revised Universal Soil Loss Equation(RUSLE),"U.S.Department of Agriculture,Agricultural Research Service Page 46 L17 sd a mtias l{a cnasag ln�nllnau6�r `aangnol..16 o luauciJndaa•s n„°(g7Sng)uopnnbg sso7 tios lnsJaatun pasiaag aip q JlM 6utuunid uo!nn.iasuo3 of aping V..iaWM fiq uotsodg lzos 6upolpa.id„ •£oZ)loogpuDH aanllno>tfv vase fo z.ialdnz{3 wolfpaldnpn algn,L •IE aaquzaaaa uo spua pus II aaqutaaa j uo supaq popad pug auy •popad 2upno"03 atg aaopaq Asp au}'gun s}ssi pus anogs aigi i auk ut paisq asp atg uo supaq potaad aria 0oi L6 t.6 ,o6 98 t78 18 8L SG IL L9 T9 S5 617 tib gE E£ Lz YE LT ET 6 9 E o 901 ooI 66 86 56 z6 6g 98 T8 LL zL 99 179 T9 9S gb LE gz 0z bT o1 L S E 1 0 L6 oat L6 176 o6 98 Zg 8L bL oL 99 E9 gS b4 617 Et LE of CZ LT ET 6 9 b z 0 96 001 g6 96 E6 6g bg 6L EL 89 z9 LS TS 017 Ti' SE Lz gi � bi IT 6L SE I o 56 001 g6 96 176 16 88 Eg 9L oL S9 19 _ L5 E5 Lt. gE 6z iz 5T oI g 9 17 z T o b6 001 66 66 86 L6 T6 Sg og ' 9L zL L9 z9 99 617 ob Sz £T g 9 17 E _ z T T o E6 001 ooi 001 66 66 96 gg TB tiL L9 09 ES 917 6£ 6z 9T 9 z I LI 1 0 0 0 0 z6 00T 00T 001 66 66 96 88 Tg tiL L9 09 E9 917 6E 6z 91 9 z I T I 0 0 0 0 16 001 66 g6 L6 S6 z6 Lg TB tiL 69 S9 09 _ 179 917 LE 63 Tz ET g 9 b E z T o o6 ooi 0O1 001 66 g6 L6 176 o6 Eg 9L 69 z9 SS gb BE Lz g z L ti C z T T o 6g 'Eft'IT/ET 9z/Ii iT/ITLZ/OT ZI/OI LE/6 zi/6 8z/8 Ei/g 6z/L b1/44 6z/9 b1/9 OS/S 51/S OE/17 51/17 T£/E 91/E I/£ Si/z TE/T 9T/I T/I #I� :spouad suxay ui sauoz Ia ao;saatpui Ctetsoaa :Q xtpuaddy 00009rggy}tuuad isaauao gaudy Ruzaad'saauaf uopannsuo3 TCEQ Office Use Only Permit No. RN CN Region. TCEQ Notice of Intent (NOI) for Stormwater Discharges Associated with Construction Activity under TPDES General Permit (TXRi50000) IMPORTANT: • Use the INSTRUCTIONS to fill out each question in this form. • Use the CHECKLIST to make certain all You filled out all required information. Incomplete applications WILL delay approval or result in automatic denial. • Once processed your permit can be viewed at: http.//www2.tceq.texas.gov/wq dpa/index.cfm ePERMITS: Sign up now for online NOI https.//www3.tceq.texas.gov/steers/inclex.efm Pay a$225 reduced application fee by using ePermits. APPLICATION FEE: • You must pay the$325 Application Fee to TCEQ for the paper application to be complete. • Payment and NOI must be mailed to separate addresses. • Did you know you can pay on line? • Go to haps://www3.tceq.texas.gov/epay/ind.ex.cfm • Select Fee Type: GENERAL PERMIT CONSTRUCTION STORM WATER DISCHARGE NOI APPLICATION 11/4 • Provide your'payment information below,for verification of payment: Mailed Check/Money Order No. Name Printed on Check: EPAY Voucher No. Is the Payment Voucher copy attached? El Yes RENEWAL: Is this NOI a Renewal of an existing General Permit Authorilation? (Note:A permit cannot be renewed after June 3, 2m3.) Dyes The Permit number is:TXR15 (If a permit number is not provided, a new number will be assigned.) No i) OPERATOR(Applicant) a) If the applicant is currently a customer with TCEQ,what is the Customer Number(CN) issued to this entity? You may search for your CN at: hlt.p://www12.tceq.texas.gov/crpub/index.cfm?fuseaction-cust.CustSearch CN TCEQ 20022(03/05/2013) Page b) What is the Legal Name of the entity(applicant) applying tit this permit? (The legal name must be spelled exactly as filed with the Texas Secretary of State, County,or in the legal document forming the entity) c) What is the name and title of the person signing the application? The person must be:an. executive:official meeting:signatory requirements in TAC 305.44(a)• Prefix(Mr Ms.Miss) First/Last Name: ... Suffix: Title: Credential. d) What is the Operator Contact's(Responsible Authority)contact information and mailing address as.recognized by the US Postal Service(LISPS)? You may verify the address at: http.fizip4.usps.com/zipzilweleome.jsp Phone# ext: Fax# . . E-mail. Mailing Address. Internal Routing(Mail Code;Etc.)- City. State: ZIP Code: If outside USA. 'Territory Country Code: Postal Code: e) Indicate the type of Customer(The instructions:will help determine your customer type) ▪ Individual El Limited Partnership 0 Sole Proprietorship-DBA Joint Venture El General Partnership ❑.Corporation 0 Trust El Estate ❑.Federal Government ❑State Government ❑County Government ❑City Government ❑Other Government f) Independent Operator? El Yes: El No (If governmental entity,subsidiary;or.part of a larger corporation,check"NO") g) Number.of Employees. .❑0-20; ❑21-100; 0101-250; ❑251.500;.or 1=1,501 or higher h) Customer.Business Tax and Filing Numbers. (REQUIRED for Corporations and Limited Partnerships. Not Required for Individuals,, Government,or Sole Proprietors) State Franchise Tax ID Number: Federal Tax ID- Texas Secretary of State Charter(filing)Number DUNS Number(if known) 2) APPLICATION CONTACT If TCEQ needs additional information regarding this application,who should be contacted? Is the application contact the same as the applicant identified above? Cl Yes,go to Section 3). ❑ No, complete section below Prefix(Mr Ms.Miss): First/Last Name_: Suffix: Title: Credential. TCEQ.20022(03/05/2013) Page 2 Organization Name: Phone No. ext: Fax Number E-mail... . .. Mailing Address Internal Routing(Mail]Code,Etc.) City State: ZIP Code: Mailing:Information if outside USA. Territory Country Code: Postal Code: 3) REGULATED ENTITY(RE) INFORMATION ON PROJECT OR SITE If the site.of your.business is part of a.larger.business site or if other businesses were located at this site before yours; a Regulated Entity Number(RN)may already be assigned for the larger site. Use the RN assigned for the larger site. Search TCEQ's Central Registry to see if the larger site may already be registered as a regulated site at: http://www12.tceq.texas.gov/crpub/index:cfm?fuseaction=regent.RNSearch. If the site is found,provide the assigned Regulated Entity Reference Number and provide:the information for the site to be authorized through this application below. The site information for this authorization may vary from the larger site information. a) TCEQ issued RE Reference Number(RN) RN b) Name of project or:site(the name known by the community where located) c) In your own words,briefly describe the primary.business of the Regulated Entity (Do not repeat the SIC and NAICS code) d) County(or counties if> i) e) Latitude:. . Longitude: f) Does the site have a physical address? ❑Yes, complete Section A for a physical address. ❑No,complete Section B for site location information. Section A: Enter'the physical address,for the site. Verify the address with USPS.If the address is not recognized as a delivery address,provide the address'as identified for overnight mail delivery, 911 emergency or other online map tools to confirm an address. Physical Address of Project or Site: Street Number Street Name: City State: Texas . ZIP Code:.. TCEQ 20022(03/05/201.3) Page 3 Section,3: Enter the}site;location information. If no physical address (Street Number&Street Name),provide a written location access description to the site. (Ex. located 2 miles west from intersection of Hwy 290&IH35 accessible on Hwy 290 South) City where the site is located or,if not in a city,what is the nearest city. �. State: Texas ZIP Code where the site is located. 4) GENERAL CHARACTERISTICS a) Is the project/site located on Indian Country Lands? ❑ Yes-If the answer is Yes,you must obtain authorization through EPA,Region 6. ❑ No b) Is your construction activity associated with a facility that,when completed,would be associated with the exploration,development,or production of oil or gas or geothermal resources? ❑ Yes-If the answer is Yes,you may be under jurisdiction of the Railroad Commission of Texas and may need to obtain authorization through EPA,Region 6. ❑ No c) What is the Primary Standard Industrial Classification(SIC)Code that best describes the construction activity being conducted at the site? Primary SIC Code: d) If applicable,what is the Secondary SIC Code(s) e) What is the total number of acres disturbed? f) Is the project site part of a larger common plan of development or sale? ❑ Yes-If the answer is Yes,the total number of acres disturbed can be less than 5 acres. ❑,No -If the answer is No,the total number of acres disturbed must be 5 or more. If the total number of acres disturbed is less than 5 then the project site does not qualify for coverage through this Notice of Intent. Coverage will be denied. See the requirements in the general permit for small construction sites. g) What is the name of the first water body(s)to receive the stormwater runoff or potential runoff from the site? h) What is the segment number(s)of the classified water body(s)that the discharge will eventually reach? TCEQ 20022(03/05/2013) Page 4 i) Is the discharge into an MS4? ❑ Yes-If the answer is Yes,provide the name of the MS4 operator below ❑ No If Yes,provide the name of the MS4 operator Note: The general permit requires you to send a copy of the NOI to the MS4 operator j) Are any of the surface water bodies receiving discharges from the construction site on the latest EPA-approved CWA 3o3(d) List of impaired waters? ❑ Yes-If the answer is Yes,provide the name(s)of the impaired water body(s)below ❑ No If Yes,provide the name(s) of the impaired water body(s) k) Is the discharge or potential discharge within the Recharge Zone, Contributing Zone, or Contributing Zone within the Transition Zone of the Edwards Aquifer as defined in 3o TAC Chapter 213? ❑ Yes-If the answer is Yes,complete certification below by checking"Yes." ❑ No I certify that a copy of the TCEQ approved Plan required by the Edwards Aquifer Rule (3o TAC Chapter 213)is either included or referenced in the Stormwater Pollution Prevention Plan. ❑ Yes TCEQ 20022(03/05/2013) Page 5 5) CERTIFICATION Check Yes to the certifications below Failure to indicate Yes to ALL items may result in denial of coverage under the general permit. a) I certify that I have obtained a copy and understand the terms and conditions of the Construction General Permit(TXR150000) El Yes b) I certify that the full legal name of the entity applying for this permit has been provided and is legally authorized to do business in Texas. ❑Yes c) I understand that a Notice of Termination(NOT)must be submitted when this authorization is no longer needed. ['Yes d) I certify that a Stormwater Pollution Prevention Plan has been developed,will be implemented prior to construction and to the best of my knowledge and belief is compliant with any applicable local sediment and erosion control plans, as required in the general permit TXR150000. Note: For multiple operators who prepare a shared SWP3,the confirmation of an operator may be limited to its obligations under the SWP3 provided all obligations are confirmed by at least one operator ['Yes t perator.Certifications I, Typed or printed name Title certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate, and complete. I am aware there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations. I further certify that I am authorized under 3o Texas Administrative Code.305.44 to sign and submit this document,and can provide documentation in proof of such authorization upon request. Signature: Date: (Use blue ink) TCEQ 20022(03/05/2013) Page 6 1 NOTICE OF INTENT CHECKLIST (TXR150000) • Did you complete everything? Use this checklist to be sure! • Are you ready to mail your form to TCEQ? Go to the General Information Section of the Instructions for mailing addresses. This checklist is for use by the operator to ensure a complete application. Missing information may result in denial of coverage under the general permit. (See NOI process description in the Instructions) Application Fee: ,. , If paying by Check: 0 Check was mailed separately to the TCEQs Cashier's Office. (See Instructions for Cashier's address and Application address.) 0 Check number and name on check is provided in this application. If using ePay; 0 The voucher number is provided in this application or a copy of the voucher is attached. PERMIT NUMBER. n Permit number provided-:if this application is for renewal of.an.existing authorization. OPERATOR INFORMATION Confirm,each item is`complete: 0 Customer Number(CN)issued by TCEQ Central Registry 0 Legal name as filed.to do business in Texas (Call TX SOS 512/463-5555) 0 Name and title of responsible authority signing the application. 0 Mailing address is complete&verifiable with USPS. www.usps.com 0 Phone numbers/e-mail address 0 Type of operator(entity type) 0 Independent operator. 0:Number of employees For corporations or limited partnerships—Tax ID and SOS filing numbers 0 Application contact and address is complete&verifiable with_USPS.http://www.usps.com REGULATED ENTITY(RE)INFORMATION ON PROJECT OR SITE—Confirm each item complete: f .' , 0.Regulated Entity Reference Number(RN) (if site is already regulated by TCEQ) D Site/project name/regulated entity 0:Latitude and longitude http.//www.tceq.texas.gov/gis/sgmaview.html 0 County Site/project physical address. Do not use a rural route or post office box. 0 Business description GENERAL CHARACTERISTICS.-Confirm each item is complete:, 0 Indian Country Lands—the facility is not on Indian Country Lands 0 Construction activity related to facility associated to oil,gas,or geothermal resources 0:Standard Industrial Classification(SIC) Code www.osha.gov/oshstats/sicser.html 0 Acres disturbed is provided and qualifies for coverage through a NOI 0 Common plan of development or sale 0 Receiving water body(s) 0 Segment number(s) 0 Impaired water body(s) 0 MS4 operator (l Edwards Aquifer rule CERTIFICATION , 0 Certification statements have been checked indicating"Yes" 0 Signature meets 30 Texas Administrative Code(TAC)305.44 and is original. TCEQ-2oo22 Checklist(03/05/2013) Page 1 Notice of Intent (NOI) for Stormwater Discharges Associated with Construction Activity under TPDES General Permit (TXRi50000) General Information and Instructions GENERAL INFORMATION where-to Send-the Notice of Intent:(NOI); BY REGULAR U.S.MAIL BY OVERNIGHT/EXPRESS MAIL Texas Commission on Texas Commission on Environmental Quality Environmental Quality Stormwater Processing Center Stormwater Processing Center (MC228) (MC228) P 0 Box 13087 12100 Park 35 Circle Austin,Texas 78711-3087 Austin,TX 78753 TCEQ;Contact:Lk; Application—status and form questions. 512/239-3700,swpermit@tceq.texas.gov Technical questions. 512/239-4674,swgp@tceq texas.gov Environmental Law Division. 512/239-0600 Records Management-obtain copies of forms. 512/239-0900 Reports,from databases(as available) 512/239-DATA(3282) Cashier's office: 512/239-0357 or 512/239-0187 'Notice'of Intent Process; When your NOI is received by the program,the form will be processed as follows: 1) Administrative Review: Each item on the form will be reviewed for a complete response. In addition,the operator's legal name must be verified with Texas Secretary of State as valid and active(if applicable). The address(s)on the form must be verified with the US Postal service as receiving regular mail delivery Never give an overnight/express mailing address. 2) Notice of Deficiency: If an item is incomplete or not verifiable as indicated above, a notice of deficiency(NOD)will be mailed to the operator The operator will have 3o days to respond to the NOD The response will be reviewed for completeness. 3) Acknowledgment of Coverage: An Acknowledgment Certificate will be mailed to the operator This certificate acknowledges coverage under the general permit. -or- Denial of Coverage: If the operator fails to respond to the NOD or the response is inadequate,coverage under the general permit may be denied. If coverage is denied,the operator will be notified. General Permit(Your'Permit) ,w For NOIs submitted electronically through ePermits,provisional coverage under the general permit begins immediately following confirmation of receipt of the NOI form by the TCEQ For paper NOIs,provisional coverage under the general permit begins 7 days after a completed NOI is postmarked for delivery to the TCEQ TCEQ-2oo22 Instructions(03/05/2o13) Page 1 You should have a copy of your general permit when submitting your application. You may view and print your permit for which you are seeking coverage,on the TCEQ web site http.//www.tceq.texas.gov Search using key word TXR150000. General:-Permit Forms The Notice of Intent(NOI),Notice.of Termination(NOT), and Notice of Change(NOC) (including instructions)are available in Adobe Acrobat PDF format on the TCEQ web site http.//www.tceq.texas.gov 'Change in'Operator An authorization under.the general permit is not transferable. If the operator of the regulated entity changes,the present permittee must submit a Notice of Termination and the new operator must submit a Notice of Intent. The NOT and NOI must be submitted no later than 10 days prior to the change in Operator status. TCEQ Central Registry Core Data Form The Core Data Form has been incorporated into this form. Do not send:a.Core Data.Form'to TCEQ After final acknowledgment of coverage under the general permit,the program will assign a Customer Number and Regulated Entity Number You can find the information on.the Central Registry web site at http.//www12.tceq.texas.gov/crpub/index.cfm. You can search by the Regulated Entity(RN), Customer Number(CN)or Name(Permittee),or by your permit number under the search field labeled"Additional ID" Capitalize all letters in the permit number The Customer(Permittee)is responsible for providing'consistent information to the TCEQ, and for updating all CN and RN data for all:authorizations as changes occur For General Permits,.a Notice of Change form must be submitted to the program area. yFees associated with a ,General,`Permit Payment of the fee may be made by check or money order;payable to TCEQ,.or through EPAY (electronic payment through the web). Application Fee: This fee is required to be paid at the time the NOI is submitted. Failure to submit payment at the time the application is filed will cause delays in acknowledgment or denial of coverage under the general permit. 1Vlailed"Payments. Payment must be mailed under separate cover at one of the addresses below using the attached Application Fee'submittal form. (DO NOT SEND A COPY OF THE NOI WITH THE APPLICATION FEE SUBMITTAL FORM) BY REGULAR U.S.MAIL BY OVERNIGHT/EXPRESS MAIL Texas Commission on.Environmental Quality Texas Commission on Environmental Quality Financial Administration Division Financial:Administration Division Cashier's Office,MC-214 Cashier's Office,MC-214 P 0 Box 13088 .12100 Park 35 Circle Austin,TX 78711-3088 Austin,TX 78753 TCEQ-2oo22 Instructions(03/05/2o13) Page 2 ePAY�Electronic.Payment:,http:%/www:tceq:texas.gov/epay When making the payment you must select Water Quality,,and then select the fee category "General Permit Construction Storm Water Discharge NOI Application" You must include a copy of the payment voucher with your NOI. Your NOI will not be considered complete without the payment voucher INSTRUCTIONS FOR FILLING OUT THE NOI FORM Renewal of General Permit. Dischargers holding active authorizations under the expired General Permit are required to submit a NOI to continue coverage. The existing permit number is required. If the permit number.is not provided or has been terminated, expired, or denied a new permit number will be issued. , 1. .Operator:(Applicant): a) Enter assigned Customer Number(CN) TCEQ's Central Registry will assign each customer a number that begins with CN,followed by nine digits.This is not a permit number,registration number, or license number If this customer has not been assigned a CN,leave the space for the CN blank. If this customer has already been assigned this number,enter the permittee's CN b) Legal Name Provide the current legal name of the permittee,as authorized to do business in Texas.The name must be provided exactly as filed with the Texas Secretary of State(SOS),or on other legal documents forming the entity,that is filed in the county where doing business.You may contact the SOS at 512/463-5555,for more information related to filing in Texas. If filed in the county where doing business,provide a copy of the legal documents showing the legal name. c) Person Signing Application Provide information about person signing section 5) Certification. d) Operator Contact's(Responsible Authority) Contact Information and Mailing Address Provide a complete mailing address for receiving mail from the TCEQ 'The.address must be verifiable with the US Postal Service at.http.//www.usps.com for regular mail delivery(not overnight express mail) If you find that the address is not verifiable using the USPS web search, please indicate the address is used by the USPS for regular mail delivery The area code and phone number should provide contact to the operator Leave Extension blank if not applicable. The fax number and e-mail address are optional and should correspond to the operator e)Type of Customer(Entity Type) Check only one box that identifies the type of entity Use the descriptions below to identify the appropriate entity type. Note that the selected entity type also indicates the name that must be provided as an applicant for a permit,registration or authorization. TCEQ-2oo22 Instructions(03/05/2o13) Page 3 Sole Proprietorship —DBA A sole proprietorship is a customer that is owned by only one person and has not been incorporated. This business may. • be under the person's name • have its own name(doing business as or d.b.a.) • have any number of employees If the customer is a Sole Proprietorship or DBA,the`legal name'of the individual business`owner'must be provided. The DBA name is not recognized as the`legal name' of the entity The DBA name maybe used for the site name(regulated entity). Individual An individual is a customer who has not established a business,but conducts an activity that needs to be regulated by the TCEQ Partnership • A customer that is established as a partnership as defined by the Texas Secretary of State Office(TX SOS) A Limited Partnership or Limited Liability Partnership (Partnership)is required to file with the Texas Secretary of State.A General Partnership or Joint Venture is not required to register with the state. • Partnership (Limited Partnership or Limited Liability Partnership):A limited partnership is defined in the Act as a partnership formed by two or more persons under the provisions of Section 3 of the Uniform Limited.Partnership Act (Art. 6132a,Revised Civil Statutes of Texas) and having as members one or more general partners and one or more limited partners.The limited partners as such are not bound by the obligations of the partnership.Limited partners may not take part in the day-to-day operations of the business.A Limited Partnership must file with the Texas Secretary of State.A registered limited liability partnership is a general or limited partnership that is registered with the Texas Secretary of State.The partnership's name must contain the words"Registered Limited Liability Partnership"or the abbreviation"L.L.P "as the last words or letters of its name. • General Partnership:A general partner may or may not invest,participates in running the partnership and is liable for all acts and debts of the partnership and any member of it.A General Partnership does not have limited partners. For a General Partnership,there is no registration with the state or even written agreement necessary for a general partnership to be formed.The legal definition of a partnership is generally stated as "an association of two or more persons to carry on as co-owners a business for profit" (Revised Uniform Partnership Act§ 101[1994]) • Joint Venture:A joint venture is but another name for a special partnership.It might be distinguished from a general partnership in that the latter is formed for the transaction of a general business,while a joint venture is usually limited to a single transaction.That is, a joint venture is a special combination of persons in the nature of a partnership engaged in the joint prosecution of a particular transaction for mutual benefit or profit. Corporation A customer meets all of these conditions. • is a legally incorporated entity under the laws of any state or country • is recognized as a corporation by the Texas Secretary of State TCEQ-2oo22 Instructions(03/05/2013) Page 4 • has proper operating authority to operate in Texas. • The corporation's`legal name'as filed with the Texas Secretary of State must be provided as applicant. An`assumed'name of a corporation is not recognized as the`legal name'of the entity Government Federal,state,county,or city government(as appropriate) The customer is either an agency of one of these levels of government or the governmental body itself. The government agency's`legal name'must be provided as the applicant. A department name or other description of the organization,should not be included as a part of the`legal name'as applicant. Trust or Estate A trust and an estate are fiduciary relationships governing the trustee/executor with respect to the trust/estate property Other Government A utility district,water district,tribal government,college district,council of governments,or river authority Write in the specific type of government. f)Independent Entity Check No if this customer is a subsidiary,part of a larger company, or is a governmental entity Otherwise, check Yes. g)Number of Employees Check one box to show the number of employees for this customer's entire company,at all locations.This is not necessarily the number of employees at the site named in the application. h) Customer Business Tax and Filing Numbers These are required for Corporations and Limited Partnerships. These are not required for Individuals,Government,and Sole Proprietors. State Franchise Tax ID Number Corporations and limited liability companies that operate in Texas are issued a franchise tax identification number If this customer is a corporation or limited liability company,enter this number here. Federal Tax ID All businesses, except for some small sole proprietors,individuals, or general partnerships should have a federal taxpayer identification number(TIN).Enter this number here.Use no prefixes, dashes, or hyphens. Sole proprietors,individuals,or general partnerships do not need to provide a federal tax ID TX SOS Charter(filing)Number Corporations and Limited Partnerships required to register with the Texas Secretary of State are issued a charter or filing number You may obtain further information by calling SOS at 512/463-5555. DUNS Number Most businesses have a DUNS(Data Universal Numbering System)number issued by Dun and Bradstreet Corp.If this customer has one, enter it here. TCEQ-2oo22 Instructions(03/o5/20i3) Page 5 2.. APPLICATION CONTACT Provide the name,title and communication information of the person that TCEQ can contact for additional information regarding this application. 3. REGULATED ENTITY;(RE),INFORMATION ON PROJECT OR SITE" a) Regulated Entity Reference Number(RN) A number issued by TCEQ's Central Registry to sites (a location where a regulated activity occurs)regulated by TCEQ This is not a permit number, registration number,or license number If this regulated entity has not been assigned an RN,leave this space blank. If the site of your business is part of a larger.business site, a Regulated Entity Number(RN)may already be assigned for the larger site. Use the RN assigned for the larger site. Search TCEQ's Central Registry to see if the larger:site may already be registered'as a regulated site at: http://www12.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.RNSearch If the site is found,provide the assigned Regulated Entity Reference:Number(RN)and provide the information for the site to be authorized.through this application. The site information for this authorization may vary from the larger site information. An example is a chemical plant where a unit is.owned or operated by a:separate corporation that is accessible by the same physical address of your unit or facility Other examples include industrial parks identified by one common address but different corporations have control of defined areas within the site. In both cases,an RN would be assigned for the physical address location and the permitted sites would be identified separately under the same RN b) Site/Project Name/Regulated Entity Provide the name of the site as known by the public in the area where the site is located.The name you provide on this application will be used in the TCEQ Central Registry as the Regulated Entity name. c) Description of Activity Regulated In your own words,briefly describe the primary business that you are doing that requires this authorization.Do not repeat the SIC Code description. d) County Identify the county or counties in which the regulated entity is located. e) Latitude and Longitude Enter the latitude and longitude of the site,in degrees,minutes,.and seconds or decimal form. For help obtaining the latitude and longitude,go to: http.//www.tceq.texas.gov/gis/sgmaview.html or http.//nationalmap.gov/ustopo f) Site/Project(RE)Physical Address/Location Information Enter the complete address for the site in Section A if the address can be validated through the US Postal Service. If the physical address is not recognized as a USPS delivery address,you may need to validate the address with your local police(911 service) or through an online map site used to locate a site.Please confirm this to be a complete and valid address. Do not use a rural route or post office box for a site location. TCEQ-2oo22 Instructions(03/05/2o13) Page 6 I.f:a site does not have an address that includes a street(or house)number and street name, enter NO ADDRESS for the street name in Section A. In Section B provide a complete written location.description. For example: "The site is.located 2 miles west from.intersection.of Hwy 290'&IH35,located on the southwest corner Of the Hwy29o.South bound lane:" Provide the city(or nearest city)and zip code of the facility-location. "4..,GENERAL;CHARACTERISTICS a) Indian Country Lands If your site is located on Indian Country Lands,.the TCEQ does not have authority to process. your application. You must obtain authorization through EPA,Region 6,*Dallas. Do not submit this form to TCEQ b) Construction activity associated with facility associated with exploration, development, or production of oil,gas; or geothermal resources If your.activity is associated with oil and gas.exploration,development,or production,you may be under jurisdiction of the Railroad Commission of Texas and may need to obtain authorization from EPA Region 6. For more.information,see: http.//info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?s1=R&app=9&p. dir=&p rloc=&p: tlo c=&p plot=&pg=1&p tac=&ti=16&pt=1&ch=38r1=30 Construction activities associated with a facility related to oil,gas or geothermal resources:may include the construction of a-well site;treatment or-storage facility;underground hydrocarbon or natural gas storage facility; reclamation plant;gas processing facility; compressor station, terminal facility where crude oil is stored prior to refining and at which refined products are stored solely for use at the facility; a carbon dioxide geologic storage facility; and a gathering, transmission,or distribution pipeline that will transport crude oil or natural gas,including natural gas liquids,prior.to refining of such oil or the use Of the natural gas in any manufacturing_process or as a residential or industrial:fuel. Where required by federal law, discharges:of stormwater associated with construction activities under the Railroad.Cornmission's jurisdiction must be authorized by the EPA and the Railroad Commission of Texas, as applicable.Activities under Railroad Commission of Texas jurisdiction include construction of.a.facility-that,when completed,would be associated with the exploration, development,or production of'oil or gas or geothermal resources,such as a well site;treatment or storage facility; underground hydrocarbonor natural gas storage facility; reclamation plant;gas processing facility; compressor station,terminal facility where crude oil is stored prior to refining and at which refined products are stored solely for use at the facility; a carbon dioxide geologic.storage facility under the jurisdiction of the Railroad.Commission of Texas, and a gathering,transmission,or distribution pipeline that will transport crude oil or natural gas,including natural gas liquids,prior to refining of such oil or the use of the natural gas in.any manufacturing process or as a residential or industrial fuel.The Railroad Commission of Texas also has jurisdiction over stormwater from land disturbance associated with a site survey that is conducted prior to construction'of a facility that would be regulated by the Railroad Commission of Texas.Under 33.U.S.C.:§1342(1)(2)and§1362(24),.EPA cannot require. a permit for discharges:of stormwater from"field activities or operations associated with{oil and gas}exploration,production,processing,ortreatment operations,or transmission facilities, including activities necessary to prepare a site.fordrilling and for the movement and.placement of drilling equipment,whether or not such field activities or operations may be considered to be construction activities"unless the discharge is contaminated by contact with any overburden, raw material,.intermediate:product,finished product,byproduct,or waste product located on the site of the facility Under§3.8 of this title(relating to Water Protection),the Railroad TCEQ-2oo22 Instructions(03/05/2°13) Page 7 Commission of Texas prohibits operators from causing or.allowing pollution of surface or subsurface water Operators are encouraged to implement and maintain best management practices(BMPs)to minimize discharges of pollutants,including.sedinient,in stormwater during construction activities to help ensure protection of surface water quality-during storm events. c) Primary Standard Industrial Classification.(SIC) Code Provide the SIC Code that best describes the construction activity being conducted at this site. Common SIC.Codes related to.construction activities include: • 1521-Construction of Single Family Homes • 1522-Construction of Residential.Bldgs.Other than Single Family Homes • 1541-Construction of Industrial Bldgs.and Warehouses • 1542-Construction of-Non-residential Bldgs,other than Industrial Bldgs.and Warehouses • 1611-Highwayand Street Construction, except Highway Construction • 1622-Bridge,Tunnel, and Elevated Highway Construction • 1623 -Water, Sewer,Pipeline and Communications, and Power Line Construction For help with SIC Codes,go to: http.//www.osha.gov/p1s/imis/sicsearch.html d) Secondary.SIC Code Secondary SIC Code(s)maybe provided.Leave blank if not applicable. For help with SIC Codes,. go to htlp.//www.osha.gov/p1s/imis/sicsearch.html. e) Total Number'of Acres Disturbed Provide the approximate number of acres that the construction site-will.disturb. Construction activities that disturb less than one acre,unless-they are part of a larger common plan that disturbs more than one acre,do not require permit coverage. Construction activities that disturb between one and five acres,unless they are part of.a common plan that disturbs more than five acres,do not require submission of an NOI. Therefore,the estimated area of land. disturbed should not be less than five,unless the project is part of a larger common plan that disturbs five or more acres. Disturbed means any clearing,.grading, excavating, or other similar activities. If you have any questions about this:item,.please contact the stormwater technical staff-by-phone at(512)239-4671 or by email at swgp@.tceq texas.gov f) Common Plan of Development Construction activities that disturb less than five acres do not.require submission of an NOI unless they are part of a common plan of development or for sale where the area disturbed is five or more acres.Therefore,the estimated area of land disturbed should not be less than five, unless the:project is part of a larger common plan that.disturbs five.or more acres. Disturbed means any clearing,grading,excavating,.Or.other similar activities. For more information on"What.is a common plan of development?"go to: www.tceq.texas.gov/permitting%stormwater/common plan of development steps.html For further information,go to the TCEQ stormwater construction webpage at: www.tceq:texas.gov/goto/construction and search for"Additional Guidance and QuickT.inks" If TCEQ-2oo22Instructions(03/05/2013) Page.8 you have any further questions about this item,please call the stormwater technical staff at (512)239-4671. g) Identify the:water body(s)receiving stormwater runoff The stormwater maybe discharged directly.to a receiving stream or through a MS4 from your site. It eventually reaches a receiving water body such.as a local stream or lake,possibly via.a drainage ditch.You must provide.the name of the water body that receives the discharge from the site(a local stream or:lake) If your site has more than one outfall you need to include the name of the first water body for each outfall,if they are different h) Identify the.segment number(s) of the:classified water body(s) Identify the classified segment numbers)receiving a.discharge directly or indirectly Go to the following link to find the segment number of the classified water body where.stormwater will flow from the site:www.tceq.texas.gov/waterquality/monitoring/viewer.htmi You may also.find the segment number in TCEQpubli'cation GI-316 www.tceq.texas.gov/publications/gi/gi-316 If the discharge:is into an unclassified receiving water and then crosses:state lines prior to entering a classified segment,select the appropriate watershed. • moo (Canadian River Basin) • 0200 (Red River Basin) • 030o(Sulfur River Basin) • 040o (Cypress Creek Basin) • 0500 (Sabine River Basin) Call the Water Quality Assessments section at(512)239-4671 for further assistance. ). Discharge into MS4—IdentifytheMS4 Operator The discharge may initially be into-a municipal separate storm sewer.system(MS4). If the stormwater discharge is into.an MS4,provide:the'name of the entity that operates the MS4 where the stormwater discharges. An MS4 operator is often:a city,town,county,or utility district,but possibly can be another form of government. Please note that the Construction General Permit requires the Operator to supply the MS4 with a copy:of the NOI.submitted to TCEQ For assistance,.you may call the technical staff at(512)239-4671• j) Surface Water bodies on list of impaired waters—Identify the impaired water body(s) Indicate Yes or No if any surface water bodies receiving:discharges from the construction site are on the latest EPA-approved CWA 303(d)List of impaired waters. Provide the name(s)of surface water bodies receiving discharges or potential discharges from the construction site that are on the.latest.EPA-approved CWA 3o3(d)List.of impaired waters.The.EPA-approved CWA 393(d) List of impaired waters in Texas can be found at: wwwAceq.texas.gov/waterquality/assessment/3o5 3o3.html NOTE. Do not use.any"draft" documents. TCEQ-20o22 Instructions(03/435/2o13) Page:9. k) Discharges to the Edwards Aquifer Recharge Zone and Certification See maps on the TCEQ website to determine if the site is located within the Recharge Zone, Contributing Zone,or Contributing Zone within the Transition Zone of the Edwards.Aquifer at: www.tceq.texas.gov/field/eapp/viewer.html: If the discharge or potential discharge is within the Recharge Zone,Contributing Zone, or. Contributing Zone within the Transition Zone of the Edwards Aquifer, a site specific authorization approved'by the Executive Director under the Edwards Aquifer Protection Program(3o TACChapter 213)is required before construction can begin. The certification must be answered"Yes"for coverage under the Construction General Permit. The TCEQ approved plan must be readily available for TCEQ staff to review at the time that,the NOI is submitted. The general permit requires the approved Contributing Zone Plan or Water Pollution Abatement Plan to be included or referenced as a part of the Stormwater.Pollution Prevention Plan. For questions regarding the Edwards Aquifer Protection Program, contact the appropriate TCEQ Regional.Office.For projects in Hays,Travis and Williamson.Counties.Austin Regional Office, 12100 Park 35 Circle,Austin,TX.78753,512-339-2929.For Projects in Bexar, Corral, Kinney,Medina and.Uvalde Counties:TCEQ San Antonio.Regional Office, 1425o Judson Rd., San Antonio,TX 7$233-4480,.210-49o-3096• CERTIFICATIONS, Failure to indicate Yes to ALL of the certification items may result in denial of coverage under the general permit. a) Certification of Understanding:the.Terms and Conditions of Construction General Permit(TXRi50000) Provisional coverage under the Construction General.Permit(TXRi50000)begins 7 days after the completed paper.NOI is postmarked for delivery to the TCEQ (Electronic applications submitted through ePermits have immediate provisional coverage) You must obtain a copy and read the Construction General Permit before submitting your application.You may view and print the Construction General Permit for which you are seeking coverage at the TCEQ web site: www.tceq.texas.gov/goto/construction b) Certification of Legal Name The full legal name of the applicant as authorized to do business in Texas is required.The name must be provided exactly as filed with the Texas Secretary of State(SOS),or on other legal documents forming the entity,that is filed in the county where doing business.You may contact the SOS at(512)463 5555,for more information related to filing in Texas. c) Understanding of Notice of Termination A permittee shall terminate coverage under this Construction General Permit through the submittal of a NOT when the operator of the facility changes,final stabilization has been reached,the discharge becomes authorized under an individual permit,or the construction activity never began at this site. d) Certification of Stormwater Pollution Prevention Plan The SWP3 identifies the areas and activities that could produce contaminated runoff at your site and then tells how you will ensure that this contamination is mitigated.For example,in describing your mitigation measures,your site's plan might identify the devices that collect and TCEQ-20022 Instructions(03/05/2°33) Page io filter stormwater,tell how those devices are to be maintained, and tell how frequently that maintenance is to be carried out.You must develop this plan in accordance with the TCEQ general permit requirements.This plan must be developed and implemented before you complete this NOI.The SWP3 must be available for a TCEQ investigator to review on request. Operator Certification;. The certification must bear an original signature of a person meeting the signatory requirements specified under 3o Texas Administrative Code(TAC) §305.44• IF YOU ARE A CORPORATION The regulation that controls who may sign an NOI or similar form is 3o Texas Administrative Code§305.44(a)(1) (see below) According to this code provision, any corporate representative may sign an NOI or similar form so long as the authority to sign such a document has been delegated to that person in accordance with corporate procedures. By signing the NOI or similar form,you are certifying that such authority has been delegated to you. The TCEQ may request documentation evidencing such authority IF YOU ARE A MUNICIPALITY OR OTHER GOVERNMENT ENTITY: The regulation that controls who may sign an NOI or similar form is 3o Texas Administrative Code§305.44(a)(3) (see below) According to this code provision,only a ranking elected official or principal executive officer may sign an NOI or similar form. Persons such as the City Mayor or County Commissioner will be considered ranking elected officials. In order to identify the principal executive officer of your government entity,it may be beneficial to consult your city charter,county or city ordinances,or the Texas statute(s)under which your government entity was formed.An NOI or similar document that is signed by a government official who is not a ranking elected official or principal executive officer does not conform to§305.44(a)(3)•The signatory requirement may not be delegated to a government representative other than those identified in the regulation.By signing the NOI or similar form,you are certifying that you are either a ranking elected official or principal executive officer as required by the administrative code. Documentation demonstrating your position as a ranking elected official or principal executive officer may be requested by the TCEQ. If you have any questions or need additional information concerning the signatory requirements discussed above,please contact the Texas Commission on Environmental Quality's Environmental Law Division at(512)239-0600. 30 Texas,Administrative Code §305.44• Signatories to Applications (a) All applications shall be signed as follows. (1) For a corporation,the application shall be signed by a responsible corporate officer For purposes of this paragraph, a responsible corporate officer means a president, secretary,treasurer,or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation,or the manager of one or more manufacturing,production, or operating facilities employing more than 25o persons or having gross annual sales or expenditures exceeding$25 million(in second-quarter 198o dollars),if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. Corporate procedures governing authority to sign permit or post-closure order applications may provide for assignment or delegation to applicable corporate positions rather than to specific individuals. TCEQ-2oo22 Instructions(03/05/2013) Page 11 (2) For a partnership or sole proprietorship,the application shall be signed by a general partner or the proprietor,respectively (3) For a municipality,state,federal, or other public agency,the application shall be signed by either a principal executive officer or a ranking elected official. For purposes of this paragraph, a principal executive officer of a federal agency includes the chief executive officer of the agency, or a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency(e.g.,regional administrator of the EPA). TCEQ-2oo22 Instructions(03/05/2013) Page 12 Texas Commission on Environmental Quality General Permit Payment Submittal Form Use this form to submit your Application Fee only if you are mailing your payment. • Complete items 1 through 5 below. • Staple your check in the space provided at the bottom of this document. • Do not mail this form with your NOI form. • Do not mail this form to the same address as your NOI. Mail this form and your check to: BY REGULAR U.S.MAIL BY OVERNIGHT/EXPRESS MAIL Texas Commission on Environmental Texas Commission on Environmental Quality Quality Financial Administration Division Financial Administration Division Cashier's Office,MC-214 Cashier's Office,MC-214 P 0 Box 13088 12100 Park 35 Circle Austin,TX 78711-3088 Austin,TX 78753 Fee Code:` GPA General Permit: , TXR150000 1. Check/Money Order No. 2. Amount of Check/Money Order 3. Date of Check or Money Order 4. Name on Check or Money Order 5. NOI INFORMATION If the check is for more than one NOI,list each Project/Site(RE)Name and Physical Address exactly as provided on the NOI. DO NOT SUBMIT A COPY OF THE NOI WITH THIS FORM AS IT COULD CAUSE DUPLICATE PERMIT ENTRIES. See Attached List of Sites(If more space is needed,you may attach.a list.) Project/Site(RE)Name: Project/Site(RE)Physical Address. Staple Check in ThisSpace: �..__. .__, TCEQ-20134(04/13/2006) Page i grog Notice of Change (NOC) to an Authorization Permit E9 No:Office Use Only for Stormwater Discharges Associated with RN Construction Activity under TPDES General PT TCEQ Permit (TXR150000) . • ,.,,. PLEASE READ THE•FOLLOWING INFORMATION:AND"INS'TRTJCTIONS=BEFORE FILLING OUT THIS FOIM. Tlie form will:be returned:for;one of the following;.reasonsc 1).the permit number is not provided;invalid;;orno longer active; ' 2) "a"wet ink signature of.person'ineeting signatory,requirements for.permittee is not provided, 3).the currentpermittee;is nottlie applicant,and; • 4)a requested change in operator:name•is not a:legal name,change THIS.FORM.CANNOT BE-USEDFOR A CHANGE IN OPERATOR REFER TO YOUR GENERAL PERMIT .. What is.the Permit Number of the authorization to be changed? TXR15 A. APPLICANT INFORMATION; ' Search`Central Registry at wwwi2:tceq.texas.gov/crpub/., 1.Operator(Permittee) . , ., a. What is the full Legal Name of the current Operator as on the authorization? b. What is the TCEQ Central Registry Customer Number assigned to this Operator? CN 2.Permitted Site(required)' What is the TCEQ Central Registry Regulated Entity Number,assigned for this permitted site? RN B._.REQUESTED CHANGE:TO;PERMITTED INFORMATION . , What'information has changed or needs corrected? (Check one or more of the sections being updated and enter the new information in the corresponding section of this form.) Operator Legal Name Change with Texas Secretary of State(TX SOS). Go to Section 1 &/or 2 as applicable. (Note: Permits are not transferable. If a change in entity has occurred,this NOC is not attainable.) Address and.contact:information for Operator,Billing for Annual fee,or Discharge Monitoring Report forms. ri Site Information(Regulated Entity) (Note: Permits under a general.permit are site specific. If a change in site:location has occurred,this NOC is not attainable:) ❑ General Characteristics relating to the regulated activity 1. •OPERATOR LEGAL NAME CHANGE a. What is the:NEW active Legal Name with TX SOS or on other legal document? New Legal Name: b. What is the TX SOS:Filing Number for us to confirm this official name change? (This is only applicable to Limited Partnership or Corporations.) 2. ADDRESS&CONTACT INFORMATION CHANGE a. What mailing address and/or contact information has changed? (check one or more as applicable) El Operator for permit correspondence ❑ Site(RE)Mailing Address and contact information Billing address/contact for Receiving Annual Fee Reporting address/contact for Receiving Discharge Monitoring Statement Reports(DMRs) b. If you selected more than one,is the information to be updated the same for each selection? ❑Yes—Provide the updated information in the fields below ❑No— Attachment 1 of the NOC is attached to this form,to provide the different addresses. ATTN or C/O Address: Suite No./Bldg.No./Mail:Code: City' State: : ZIP Code: Country Mailing Information(if outside USA). Country Code: Postal Code: Phone No. ( ) Ext: Fax No. ( ) E-Mail. TCEQ-20391 (07/13/2007) Page 1 3. REGULATED ENTITY(RE) SITE INFORMATION CORRECTION a. IS this a change to the location of the permitted activity? ❑Yes- this requested change will not be processed since the authorizations are site.specific. ❑No—.go to next question. h New or Corrected Name of Project.or Site Updated Physical Address(new 911 address): Street Number: Street Name: r Bldg/Ste No. City- I ZIP Code: • County(Counties if>1): d. Update or Corrected location access description,if no physical address'(Street Number&Street Name): e. Corrected.Latitude: N Corrected Longitude: W 4. CHANGE IN CHARACTERISTICSPROVIDED ON ORIGINAL FORM Identify the specific change and provide the updated information. If an attachment is need,please reference it below C. APPLICATION'CONTACT. ,. . ... If TCEQ needs additional information regarding this application,who should be contacted? 1 Name: Title: Company 2.Phone No. ( ) Ext: Fax No. ( ) E-Mail. D�. CERTIFICATION ., r Operator Certification: I, Typed:or printed name(REQUIRED) Title(REQUIRED) rtify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system ,signed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the-information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations. I further certify that I am authorized under 30 Texas Administrative Code§305.44 to sign and submit this document,and can provide documentation in proof of such authorization upon request. Signature: Date: (Use blue ink) (REQUIRED). (REQUIRED) f TCEQ-20391 (07/13/2007) Page 2 Attachment 1 to a NOC Form for Providing Different Address & Contact.Information Related to a.Specific Permit Under General Permit TXR150000 What is the Permit No.? TXR15 (REQUIRED) ADDITIONAL ADDRESS&CONTACT INFORMATION Fill in the changes as applicable. Incomplete and invalid,addresses will not be used. Verify mailing addresses at USPS.com. Oper'ator ATTN or C/O Address: Suite:No./Bldg.No./Mail Code: City State: ZIP Code: Country Mailing Information(if outside USA). Country Code: Postal Code: Phone:No. ( ) Ext: Fax No. ( ) E-Mail. -Billing Address for Receiving Annual Fee Statement ATTN or C/O' Address. Suite No./Bldg.No./Mail Code: City State: ZIP Code: Country Mailing Information(if outside USA). Country Code: Postal Code: Phone No. ( ) Ext: Fax No. ( ) E-Mail. 'Site(RE)Mailing Address ATTN or C/O Address: :Suite No./Bldg.No./Mail Code: City State: ZIP Code: Country Mailing Information(if outside USA). Country Code: Postal Code: Phone:No. ( ) Ext: Fax No. ( ) E-Mail. TCEQ-20391 NOC Attachment 1(07/13/2007) Page 1 Notice of Change. (NOC) to an Authorization.for Stormwater Discharges • Associated with Construction Activity under TPDES General Permit (TXR1'50000) General Information and Instructions GENERAL INFORMATION .. ... Where to Send the Notice of Change(NOC): BY REGULAR U.S.MAIL. BY OVERNIGHT/EXPRESS.MAIL Texas Commission on Environmental Quality Texas Commission'on Environmental Quality Stormwater Processing Center.(MC228) Stormwater Processing.Center (MC228) P.O Box 13087 12100 Park 35 Circle Austin,TX 78711-3087 Austin,TX 78753 TCEQ.Contact list: Application Processing Questions relating to the status and form requirements: 512/239-3700 or email swpermit@tceq.texas.gov Technical Questions relating to the.general permit: 512/239-4671 Environmental Law Division: 512/239-0600 Records Management for obtaining copies of forms:submitted to TCEQ. 512/239-0900 Information Services for•obtaining reports from program data bases(as available):512/239-DATA (3282) Financial Administration's Cashier's office: .5.12/239-0357 or 512/239-0187 Notice of Change Process: When your NOC is received by the program,the form will be processed as follows: 1 Administrative Review. The form will be reviewed to ensure the request is:from the permittee(operator)on the authorization,:the permit is active arid initial coverage was acknowledged. Each item on-the form will be reviewed for a complete response:that qualifies for a NOC.In-addition,the ierator's legal name change must be verified with Texas Secretary of State(if applicable). The address(s)on the form must be verified with the:US )stal service as an address receiving:regular mail delivery.Never give an ovemight/express:inailing address. If an item is incomplete or.not verifiable as indicated above,the operator may be notified by letter,phone.call or email. In some instances as noted at the: beginning of the form,the request may simply be returned. 2. NOC Confirmation. An updated Acknowledgment Certificate:will be mailed to the operator only if the NOC:is to change information provided on the:acknowledgment certificate. The original coverage.effective date will not change. General Permit(Your Permit) You may view and.print your general permit.on the TCEQ web site www.tceq.texas.gov. Enter the general permit number as the key word in the search box to locate the specific web page. General Permit Forms The Notice of Intent(NOI),Notice of Termination(NOT),and Notice of Change(NOC)with instructions are available in Adobe Acrobat PDF format onthe TCEQ web site www.tceq.texas.gov. Change in Operator An authorization under the general permit is not transferable: If the•operator of the regulated entity changes,the present permittee must submit a Notice of Termination and the new operator must submit a Notice of Intent. The NOI must be submitted not later than 10 days priorto the change in Operator status. Note:that the NOT is effective on the:postmarked date.It may be necessary to not terminate:the existing permit until.coverage by the new entity is confirmed. TCEQ Central.Registry Core Data:Form The Core Data Form has been'incorporated into this form. Do not send a core data form to TCEQ. You can find the information on the Central Registry web site at wwwl2.tceq.texas.gov/crpubl You can search by the Regulated Entity(RN),Customer Number(CN)or Name(Pemuttee),or by:your permit number under the search field labeled "Additional ID" The Customer(Permittee):is zesponsible for providing:consistent information:to•the TCEQ,and forupdating all CN and RN data for all associated authorizations as changesoccur: For General Permits,a Notice of Change form:must be submitted.to:the program area for approval to update the CN and RN data in central registry TCEQ-20391 NOC Instructions (07/13/2007) Page 1 INSTRUCTIONS FOR FILLING.OUT THE NOC.FORM I A�Applicant Information(Operator): ,- ., . „ , ,.... 1 Provide the current permittee(s)full legal name as blithe permit. b. Provide the TCEQ Issued CustomerNumber(CN)for the entity Go to http://wwwl2.tceq.texas.gov/crpub/'to locate your CN. If the name(s)provided do not match the current permittee name(s),this form Willie returned. It is the responsibility of the permittee(s)to comply with the general permit. Note: If a change is being made to the CN and the CN has other TCEQ authorization types,it is the entity's responsibility to update those authorizations at the same time. If an authorization has been cancelled or terminated,the name can not be changed on the.permit. Because of this,.a.new CN may be issued for the new name. 2. Provide the TCEQ Issued Regulated Entity number assigned for this permitted activity Go to http://www12.tceq.texas.gov/crpubf to'locate your CN. If the site has changed or the•information provided indicates a new location,this form will be returned. It is the responsibility of the(permittees)to comply with:the general permit. :.:B REQUESTED`CHANGE'TO TEOMITTEp INFORMATION, ,, Check one or more of the:available options indicating the'inforniation in the form that is to be updated: Provide the updated infonination in Section 1 for Legal Name Change, Section 2 for Address&Contact Information Change;•Section 3 for Regulated Entity Site Information Change,Or Section 4 for General Characteristics Change,as applicable. 1.LEGAL:NAMIJ,CHANGE Provide the new legal name. If the entity is a Limited Partnership or Corporation,the name change must be verifiable with Texas.Secretary of State. 'The TN SOS filing number must be provided to verify,only a name change occurred: You may contact the-SOS at 512/463-555'5,for more information related to filing in Texas. If filed in the county where doing business,-provide a copy of the legal documents showing.the legal name change. Legal name changes of a'Corporation and Limited Partnership will be verified with Texas Secretary of State. If the entity is filed as a new entity with a new filing number,then the Change cannot be made-through a NQC. The permits.are not transferable: If the operator changes;the old entity must terminate their permit and the'new entity must submit a form for anew-permit. 2.ADDRESS'&CONTACT INFORMATION CHANGE, . t . , , ,, , . _ . Indicate the type of address and contact information that has changed from the original NOI or last NOC submitted to TCEQ If the.address and/or contact information is the same for all types,then check each.type and enter the.information in the fields on-the form. If some types have different information,then use the NOC ATTACHMENT 1 The permit number MUST be written on ATTACHMENT 1 to indicate it is a:part of the NOC form for the permit being updated. The updates cannot be made without reference:to the submitted NOC form. Mailing Address The address.MUST BE verifiable with the US Postal Service-at www.usps.com.,for regular mail delivery(not:overnight express mail). If you-find that the address is not verifiable using the USPS web search,please'indicate the address is.used by the USPS for regular mail.delivery Failure to provide a valid mailing address will delay or prohibit us from updating the permit. Please note that address.updates relating to a.general permit authorization can ONLY be made through a Notice of Change. Address-changes submitted through any other form can not be processed: '3. REGULATED:ENTITY(RE)'SITE INFORMATION CORRECTION The NOC form is only for use to update or correct information submitted on the original application or lastNOC for the authorization. The authorization under a general permit is site specific. If this change is related to a new location,a Notice of Change is not.attainable. Provide the updated site name,updated site addresses,and/or corrected latitude and longitude,as applicable to your NOC request. A new physical address for an existing location is usually the result of a newly assigned 911 address for emergencies. If providing.a corrected latitude-and longitude,enter the latitude and longitude of the site in either degrees,minutes,and seconds or decimal form.For • help obtaining,the latitude and longitude,go to: www.tceq.state:tx.us/gis/drgview.htinl or.www.terraserver.microsoft:coni/advfind.aspx. 4.,GENERAL-CHARACTERISTIC . .. .. . . . Indicate the change to information originally supplied. For,example if the number:of acreas of area disturbed has changed,then state:"The number acres of area.disturbed has increase.to 40 acres." C.Application Contact .., .. .. ,., , .. . . ... ' Provide the name,title and communication information of the person that TCEQ can contact for additional information regarding this application. TCEQ-20391 NOC Instructions (07/13/2007) Page 2 D. CERTIFICATIONS The certification must bear an original signature of a person meeting the signatory requirements specified under 30 Texas Administrative Code(TAC) 305.44 F YOU ARE A CORPORATION The regulation that controls who may sign an NOI or similar form is 30 Texas Administrative Code§305.44(a)(1)(see below). According to this code provision,any corporate representative may sign an NOI or similar form so long as the authority to sign such a document has been delegated to that person in accordance with corporate pro cedures. By signing the NOI or si milar form,you are certifying that such authority has been deleg ated to you. The TCEQ may request documentation evidencing such authority IF YOU ARE A MUNICIPALITY OR OTHER GOVERNMENT ENTITY The regulation that contro is who may sign an NOI or similar form is 30 Texas Administrative Code§305.44(a)(3)(see below). According to this code provision,only a ranking elected official or principal executive officer may sign an NOI or similar form. Persons such as the City Mayor or County Commissioner will be considered ranking elected officials. In order to identify the principal executive officer of your government entity,it may be beneficial to consult your city charter,county or city ordinances,or the Texas statute(s)under which your government entity was formed.An NOI or similar document that,is signed b y a governor ent official who is not a rankin g elected official or princip al executive officer does not conform to §305 44(a)(3).The signatory requirement may not be delegated to a government representative other than those identified in the regulation.By signing the NOI or s imilar form,you are certifying that you are either a ranking elected official or principal executive officer as required by the administrative code. Documentation demonstrating your position as a ranking elected official or principal executive officer may be requested by the TCEQ r , If you have any questions or need addition al information concerning the signatory requirements discussed above,please contact the Texas Commission on Environmental Quality's Environmental Law Division at 512/239-0600. 30 Texas Administrative Code §305.44. Signatories to Applications. (a) All applications shall be signed as follows. (1) For a corporation,the application shall be signed by a responsible corporate officer. For purposes of this paragraph,a responsible corporate officer means a pres ident,secretary, treasurer,or v ice-president of the corpor ation in charge of a pr incipal business function,or any other person who performs si milar policy or decisi on-making functions for the corpor ation;or the manager of one or more manufacturin g,production,or operating facili ties employing m ore than 250 persons or having gross annual sales or expend itures exceeding $25 million(in sec ond-quarter 1980 dollars),if authority to sign documents has been assigned or de legated to the manager in accordance with corpor ate procedures. Corporate pro cedures verning authority to sign permit or post-closure order applicati ons may provide for assignment or delegation to applicable corporate positions rather in to specific individuals. (2) For a partnership or sole proprietorship,the application shall be signed by a general partner or the proprietor,respectively (3) For a municipality,state,federal,or other public agency,the application shall be signed by either a principal executive officer or a ranking elected official. For purposes of this paragraph,a principal executive officer of a federal agency includes the chief executive officer of the agency,or a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency(e.g.,regional administrator of the EPA). TCEQ-20391 NOC Instructions (07/13/2007) Page 3 Notice of Termination (NOT) TCEQ Office Use Only Permit No. for Authorizations.under RN TPDES General Permit TXR150000 CN TCEQ ign up now for on line NOT at https://wwwbacep.texas.gov/steers/. Get your'NOT Confirmation letter immediately after submitting the on line NOT form. What is the permit number to be terminated? Processing will be delayed without the permit.number TXR15 A. OPERATOR(applicant) 1 What is the Customer Number(CN);issued to this entity7:.CN. 2. What is the Rill Legal Name of the current permittee? This must be the:current permittee of the permit to be terminated.. .. .. 3 What is the applicant's mailing,address as recognized by the US Postal Service? Address: Suite No./Bldg.No./Mail.Code: City State: ZIP Code: Country Mailing Information(if outside USA). Country Code: Postal Code: 4 Phone No:. (. ... ) Extension., 5 FaX No. ( ).. .. .. E-mail Address: . . . . .. .. B REGULATED ENTITY(RE)INFORMATION ON PROJECT OR*SITE 1 What is the TCEQ Issued RE Reference Number(RN)? RN. 2. Name of Project or Site as.currently permitted): (example:phase and name of subdivision or name ofproject that's unique to the site) 3 Physical Address of Project or Site as currently permitted. (enter in spaces below) Street Number. Street Name: City. ZIP Code: County(Counties if>1): 4 If no physical address(Street Number.&Street Name),provide the written location access description to the.site: 'C. REASON FOR TERMINATION Check the reason for termination. ❑Final stabilization has been achieved on all portions of the site that are the responsibility of the Operator and all silt fences and other temporary erosion control§'have dither been removed,or scheduled for remnoval as defined in the SWP3. ❑ Another permitted Operator has assumed control over all areas of the site that have not been fmally stabilized,and temporary erosion controls that have been defined in the SWP3 have been transferred to the new Operator ❑The activity is now authorized under an alternate TPDES permit, . ❑The activity never began at this site that,is.regulated under the general permit. D..CERTIFIC ATION • Typed or printed name Title- certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of person or persons who manage the system,or those persons directly responsible for gathering-the information,the information submitted is;to the best of my knowledge and belief,true, accurate,and complete. I am aware there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations: I further certify that I am authorized under 30 Texas Administrative Code§305.44 to sign and submit this document,and can provide documentation in proof of such authorization upon request. Signature: Date:.. .. (Use blue ink) • TCEQ-20023(02/06/2007.) Page 1 Notice of Termination (NOT) for Authorizations under TPDES General Permit TXR150000 General Information and Instructions. GENERAL INFORMATION Where to:Send the.Notice of Intent.(NOI): BY REGULAR U.S.MAIL• •BY•OVERNIGHT/EXPRESS:MAIL Texas'Commission on Envirorirnental Quality Texas Commission on Environmental Quality Stormwater Processing Center(MC228) Stormwater Processing Center(MC228). P O.Box:13087 12100 Park 35 Circle Austin,TX 78711-3087 .. . ..Austin,TX 78753 TCEQ Contact list: Application Processing Questions relating to the status and form:requirements: 512/239-3700 or swpermit@tceq.texas.gov Technical Questions relating.to the general permit: 512/239-4671 Environmental Law Division: 512/239-0600 Records Management for•obtaining copies of.forms submitted to TCEQ. 512/239-0900 Information.Services for obtaining reports:from program data bases(as available): .512/239-DATA(3282) Financial Administration's Cashier's office: 512/239-0357 or 512/239-0187 Notice of Termination Process: A Notice of Termination is effective on the date postmarked for delivery to TCEQ. When your NOT is received by the program,the form will be processed as follows: 1 Administrative Review. The form will be reviewed.to confirm the following: • the permit number is provided • .the permit is active and has:been approved • the entity terminating the permit is the current pertnittee • the site information•matches the original permit record • the form has the required original signature with.title and date 2. Notice of Deficiency If an item is incomplete or not verifiable as indicated above,a phone call will be made to the applicant to clear the deficiency A letter will not be sent to.the permittee if unable to:process the form. 3. Confirmation of Termination: A Notice of Termination Confirmation letter will be mailed to the operator. General Permit(Your Permit) Coverage under the general permit begins 48 hours after a completed NOI is postmarked for delivery to the TCEQ You should have a copy of your general permit when submitting your application. You may view and print your permit for which you are seeking coverage,on the:TCEQ web site www.tceq.texas.gov . General Permit Forms The Notice of Intent(NOI),Notice of Termination(NOT),and Notice•of Change(NOC)•with instructions are available in Adobe Acrobat PDF format on the TCEQ web Site www.tceo.texas.gov. Change in Operator An authorization under the general permit.is not transferable. If the:operator or owner of the:regulated entity changes,:the present permittee must submit a Notice Of Termination and the new operator must submit a Notice of Intent. The NOT andNOI must be submitted not later than 10 days prior to the change:in Operator status. TCEQ Central Registry Core Data Form The Core Data Form has been incorporated into this form. Do not send a core data form to TCEQ. After final acknowledgment of coverage underthe general permit,the program will assign a Customer Number(CN)and Regulated Entity Number(RN). For Construction Permits;a new RN will be assigned for each Notice of Intent filed with TCEQ,since construction project sites:can overlap with other Customers. The RN assigned to your.construction project will not be assigned to any other TCEQ authorization. You can find the.information on the Central Registry web site at www12.tceq.texas.gov/crpub/ You can search by the Regulated Entity(RN),Customer :umber(CN)or Name(Permittee),or by your permit number under the search field labeled "Additional ID" Capitalize all letters:in the permit number. TCEQ-20023 Instructions(02/06/2007) Page 1 The:Customer(Permittee):is responsible for providing:consistent information:to:the TCEQ,and for updating'all CN and RN data for all authorzations as changes occur. For General Permits,a Notice of Change form must be.submittedte.the program area: Annual Water Quality Fee: This.fee is assessed to operators with an active authorization under the general permit on September 1 of each year. The operator will receive an invoice for payment of the annual fee in November of each year. The payment will be due 30 days from the invoice date. A 59; penalty will be assessed if the payment is received by TCEQ after the due date. Annual fee assessments cannot be waived as long as.the authorization' under the general permit is active on September 1 It's.important for the operator to submit a Notice of Termination(NOT)when coverage under the general permit is no longer required:A NOT is effective on the postmarked date of mailing the form to TCEQ. It is recommended that the NOT be mailedusing a method that documents the date mailed and received by TCEQ •Mailed Payments: You must return your payment.with the billing coupon provided with the billing statement. • ePAY Electronic.Payment: Go to www66.tceq.texas.gov/epav/ You must enter your account number provided-at the top portion of your billing statement. Payment methods include Mastercard,Visa,and electronic check payment(ACH). A.transaction over$500 can only be made by ACH. INSTRUCTIONS FOR FILLING OUT THE NOT FORM . A.OPERATOR'(currenf.permittee.) .. . 1 TCEQ Issued Customer Number(CN) 2. Legal Name of Operator The operator must be the same entity as previously submitted on the original Notice of Intent for the permit number provided. 3 Operator Mailing Address Provide a complete mailing address for receiving mail from the TCEQ. Update the address if different than previously submitted in the Notice.of Intent .or Notice of Change. . 4 Phone Number,Fax Number,and E-mail Address Provide updated contact information. B.REGULATED ENTITY(RE),INFO1 MATION ON PROJECTOR SITE ,. ` r. 1 Regulated Entity Reference Number(RN). 2.Site/Project Name/Regiilated Entity Provide the name of the site as previously submitted in the Notice of Intent for the permit number provided. 3.Site/Project(RE)Physical Address: Provide the physical address or location access.description as previously.submittedfor the permit number.provided. C..REASON;FOR TERMINATION ,,..: Indicate the reason.for terminating the permit by checking one of the options:'If the reason is.not listed then provide an attachment that explains the reason for termination. Please:read your general permit.carefully to determine.when to terminate your.permit. Permits will not be:reactivated after submitting:a termination form. The termination is effective on the date postmarked for.delivery to.TCEQ. ... D. CERTIFICATIONS. . . . . , . .. .. . . . . . ... ... .. The certification.must bear an original signature of a person meetin6g.the signatory requirenients.specified under30 Texas.Administrative Code(TAC) §305 44 IF YOU.ARE A CORPORATION The regulation.that controls who may sign an.NOI or•similar form is 30 Texas Administrative Code•§305.44(a)(1)(,see below). According to this code provision,any corporate representative may sign an NOI or similar:faint so long as the authority to sign such a document has been delegated to- that-person in accordance with corporate procedures. By:signing the NOI or similar form,you are certifying that such authority has been delegated to. you. The TCEQ:may request documentation evidencing such authority IF YOU ARE A MUNICIPALITY OR OTHER GOVERNMENT ENTITY:. 'The regulation that controls who may sign an N OI'or similar form is 30 Texas Administrative Code§305.44(a)(3)(see below). According to this code provision,only a ranking.elected official or principal executive officer may.sign an NOI or similar form. Persons such as the City Mayor or County Commissioner will be considered ranking elected officials. In order to identify'the principal executive'officer of your government entity,it may be beneficial to consult your city charter,county or.city•ordinances,or the Texas statute(s)under which your government entity was formed.An NC! similar document that is signed by a government official who is not a ranking elected official or.principal executive officer does not conform to . . TCEQ-20023 Instructions(02/06/2007) Page 2 §305 44(a)(3).The signatory requirement may not be delegated to a government representative other than those identified in the regulation.By signing the NOI or similar form,you are certifying that you are either a ranking elected official or principal executive officer as required by the administrative ^ode. Documentation demonstrating your position as a ranking elected official or principal executive officer may be requested by the TCEQ you have any questions or need additional information concerning the signatory requirements discussed above,please contact the Texas Commission on Environmental Quality's Environmental Law Division at 512/239-0600. 30 Texas Administrative Code §305.44. Signatories to Applications. (a) All applications shall be signed as follows. (1) For a corporation,the application shall be signed by a responsible corporate officer. For purposes of this paragraph,a responsible corporate officer means a president,s ecretary, treasurer,or v ice-president of the corpor ation in charge of a principal business function,or any other person who performs similar policy or decision-making functions for the corporation;or the manager of one or more manufacturing,production,or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding$25 million(in second-quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corpor ate procedures. Corporate procedures governing authority to sign permit or post-closure order applications may provide for assignment or delegation to applicable corporate positions rather than to specific individuals. (2) For a partnership or sole proprietorship,the application shall be signed by a general partner or the proprietor,respectively (3) For a municipality,state,federal,or other public agency,the application shall be signed by either a principal executive officer or a ranking elected official. For purposes of this paragraph,a principal executive officer of a federal agency includes the chief executive officer of the agency,or a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency(e.g.,regional administrator of the EPA). 1 r TCEQ-20023 Instructions(02/06/2007) Page 3 ammr AMIE Nam, gar *IN SMALL CONSTRUCTION SITE NOTICE FOR.THE Texas.Commission on Environmental Quality(TCEQ) Stormwater Program TPDES: GENERAL PERMIT TXR150000 The following information is posted in compliance with Part II.E.2. of the TCEQ General Permit Number TXR150000 for discharges of stormwater runoff from small construction sites. Additional information regarding the TCEQ stormwater permit program may be found on the internet at: http.fiwww.tceq.state.tx.usinav/permits/wcLconstruction.html Operator Name. Contact Name and Phone Number. Project Description. Physical address or description of the site's location, estimated start date and projected end date, or date that disturbed soils will be stabilized Location of Stormwater Pollution Prevention Plan. For Small Construction Activities Authorized Under Part II:E.2. .(Obtaining Authorization to Discharge) the following certification must be completed. I (Typed or Printed Name Person Completing This Certification)certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part lI.E.2. of TPDES General Permit TXR150000 and agree to comply with the terms:of this permit. A stormwater pollution prevention plan has been developed and will be implemented prior to construction, according to permit requirements. A copy'of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4 I am aware there are significant penalties for providing false information or for conducting unauthorized discharges,including the possibility of fine and imprisonment for knowing violations. Signature and Title .. . Date Date Notice Removed MS4:operator notified per Part ILF.3 -179.01.14 Fla LARGE CONSTRUCTION SITE NOTICE FOR THE Texas Commission on Environmental Quality(TCEQ) Stormwater Program TPDES GENERAL PERMIT TXR150000 "SECONDARY OPERATOR "NOTICE This: notice applies to secondary operators of construction: sites operating under Part ILE.3 of the TPDES General Permit Number TXR150000 for .discharges of stormwater runoff from construction sites equal to or greater than five acres, including the larger common plan of development. The information on this notice is required in Part III.D.2. of the general permit. Additional information regarding the TCEQ stormwater permit program may be found on the internet at: http://www.tceq.state.tx.us/nav/permits/wcLconstruction.html le-Specific TPDES Authorization Number- Operator Name: Contact Name and Phone Number. Project Descnption. Physical address or description of the site's location, and estimated start date and projected end date, or date:that disturbed soils will be stabilized. Location of Stormwater Pollution Prevention Plan(SWP3)- For Large Construction Activities Authorized Under Part II.E.3 (Obtaining Authorization to Discharge) the following certification must be completed. I (Typed or Printed Name Person Completing This Certification)certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part II.E.3 of TPDES General Permit TXR150000 and agree to comply with the terms:of this permit. A stormwater pollution prevention plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4 I am aware there are significant penalties for providing false information or for conducting unauthorized discharges,including the possibility of fine and imprisonment for knowing violations. Signature and Title Date Date Notice Removed ...MS4 operator notified per Part H..F 3. mow RIP "NM LARGE CONSTRUCTION SITE NOTICE FOR THE Texas Commission on Environmental Quality(TCEQ) Stormwater Program TPDES GENERAL PERMIT TXR150000 "PRIMARY OPERA TOR"NOTICE This notice applies to construction sites operating under Part II.E.3 of the TPDES General Permit Number TXR150000 for discharges of stormwater runoff from construction sites equal to or greater than five acres, including the larger common plan of development. The information on this notice is required in Part III.D.2, of the general permit. Additional information regarding the TCEQ stormwater permit program may be found on the internet at: http.//www.tceq.state.tx:us/nav/permits/wq_construction.html Site-Specific TPDES Authorization Number Operator Name: Contact Name and Phone.Number Project Description. Physical address or description of the site's location; and estimated start date and projected end date; or date that disturbed soils will be stabilized. Location of Stormwater Pollution Prevention Plan. 11.11.11.111 MINIM. -11111111111.1.1.11 MIME a =EN!' minim Mir iiiiiiiii aim; laiiiiai WO ;,® WO! = i . •., ti. SMALL CONSTRUCTION SITE NOTICE: .LOW POTENTIAL FOR EROSION FOR:THE Texas Commission on Environmental Quality(TCEQ) Stormwater Program TPDES GENERAL PERMIT TXR150000 The•following information is posted in compliance with Part II.E.1. of the TCEQ General Permit Number TXR150000 for discharges of'stormwater runoff from small construction sites automatically authorized based on low rainfall erosivity Additional information regarding the TCEQ storinwater permit program may be found on the internet at: http.//www.tceq.state.tx.us/nav/pernuts/wq_construction.html . 1Operator Name: Contact Name and Phone Number. Project Description. (Physical address'or description of the site's location, estimated start date and projected end date,or date that disturbed soils will be stabilized) For Small Construction Sites Authorized Under Part II.E.1 , the following certification must be .completed. I ,(Typed'or Printed Name Person Completing This:Certification)certify under penalty Of law that I.have read and understand the.eligibility requirements for claiming an.automatic authorization based on low rainfall erosivity under Part II.E.1 -of'TPDES General Permit TXR150000 and agree-to comply with the terms of this permit. Construction activities at this site shall occur within a:time period listed in Appendix A of the TPDES general permit for this county, that period beginning on and ending on I understand that if construction activities' continue past this period, all stormwater runoff must be authorized under a separate provision of the general permit. A copy Of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4 I aril aware there are significant penalties:for providing false information or for conducting unauthorized:discharges, including the-possibility of fine and imprison nerit for knowing violations. Signature and Title Date. Date Notice Removed MS4 operator notified per Part II.F.3. CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION Section 01566 SOURCE CONTROLS FOR EROSION AND SEDIMENTATION 1.0 GENERAL 1.01 SECTION INCLUDES A Descriptions of measures and practices, in response to TPDES General Permit TXR 150000, which shall be used on the Work to eliminate or significantly minimize pollutants in discharges into Surface Water in the State by controlling erosion and sediments at their source. B References to Technical-Specifications 1 Section 01550—Stabilized Construction Exit 2. Section 01562—Waste Material Disposal 3 Section 01500—Temporary Facilities and Controls C Definitions. 1 Potential Water Pollutant- any substance that could potentially alter the physical, thermal, chemical, or biological quality of the Surface Water in the State,rendering the water harmful, detrimental, or injurious to humans, animal life,vegetation, or property, or to public health, safety or welfare, or impairs the usefulness or the public enjoyment of the water for any lawful or reasonable purpose. 1.02 MEAUSREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 2.0 PRODUCTS - NotUsed 3.0 EXECUTION 3.01 PREPARATION AND INSTALLATION A Contractor shall conduct all construction operations under this Contract in conformance with the erosion control practices described in the Plans and this Technical Specification. B Erosion and sediment control measures shall be in place prior to the start of any Work that exposes the soil, other than as specifically directed by the Engineer to allow soil testing and surveying. C The Contractor shall install, maintain, and inspect erosion and sediment control measures and practices that operate effectively and as specified in the Plans and in this or other Technical Specifications. 07/2006 01566- 1 of 5 CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION D Equipment and vehicles shall be prohibited by the Contractor from maneuvering on areas outside of the limits of construction or dedicated rights-of-way and easements. Damage caused by construction traffic to erosion and sediment control systems shall be repaired immediately by the Contractor E The Contractor shall be responsible for collecting, storing,hauling, and disposing of spoil, silt, waste materials, and contaminated material resulting from erosion and sediment control measures as specified in this or other Technical Specifications and in compliance with applicable federal, state, and local rules and regulations. 3.02 EXPOSED SOIL A When soil is exposed as a result of clearing,grading,excavating,stockpiling,or other soil disturbing activities, the Contractor shall implement measures to effectively control erosion and prevent the escape of sediments from the Project Site. B Control measures may include the following practices. 1 Preserve existing vegetation to the extent possible. 2. Construct drainage swales,berms, or sediment basins. 3 Maintain grades to minimize the velocity of sheet flow over disturbed areas and promote evaporation and infiltration of storm water directly into the ground. 4 Install filter fabric fences or barriers, sediment traps, seepage basins, gabions, or storm drain inlet protection devices. 5 Utilize vegetative buffer strips,mulching, or riprap C When the placement of topsoil,bank sand, or other soil material is specified, after an area has been brought to grade and immediately prior to placement, loosen the subgrade discing or by scarifying to a depth of at least 2 inches to permit bonding to the subsoil. D When all soil disturbing activities have been completed, establish a perennial vegetative cover on all areas that are not paved, covered by permanent structures, or otherwise permanently stabilized. 3.03 DUST CONTROL A Implement control measures to minimize dust creation and movement on construction sites and roads and to prevent airborne sediment from reaching receiving streams or storm water conveyance systems, to reduce on-site and off-site damage, to prevent health hazards, and to improve traffic safety B Control blowing dust by using one or more of the following measures. 1 Mulches bound with chemical binders. 2. Temporary vegetative cover 3 Tillage to roughen surface and bring clods to the surface. 4 Irrigation by water sprinkling. 07/2006 01566-2 of 5 CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION 5 Barriers using solid board fences, burlap fences, crate walls,bales of hay, or similar materials. C Implement dust control measures immediately whenever dust can be observed blowing on the Project Site. 3.04 DEMOLITION AREAS A Demolition activities which create large amounts of dust with significant concentrations of heavy metals or other potential water pollutants shall use methods described in this Section,3 03"Dust Control",to limit transport of airborne pollutants. However, water or slurry used to control dust contaminated with heavy metals or potential water pollutants shall be retained on the Project Site and shall not be allowed to run directly into watercourses or storm water conveyance systems by the appropriate use of control measures described in this Section. Methods of ultimate disposal of these materials shall be carried out in accordance with applicable local, state, and federal health and safety regulations. 3.05 SEDIMENT TRACKING A Minimize off-site tracking of sediments and the generation of dust by construction vehicles, keeping the streets clean or construction debris and mud, by implementing one or more of the following control measures 1 Restrict all ingress and egress to stabilized construction exits. 2. Stabilize areas used for staging, parking, storage or disposal. 3 Stabilize on-site vehicle transportation routes. 4 Remove mud and other debris, washing if necessary, from vehicles prior to entrance onto public roadways from the Project Site. 5 Maintain grade to minimize the occurrence of mud on the Project Site. B Construct stabilized 'construction areas under the provisions of Section 01550 — Stabilized Construction Exists. C In addition to Stabilized Construction Exits shovel or sweep the pavement to the extent necessary to keep the street clean. Water-hosing or sweeping of debris and mud off of the street into adjacent areas is not allowed. 3.06 EQUIPMENT MAINTENANCE AND REPAIR A Control equipment maintenance and repair so that oils,gasoline,grease,solvents,and other potential water pollutants cannot be washed directly into receiving streams or storm water conveyance systems. B Control measures may include the following practices. 1 Confine maintenance and repair of construction machinery and equipment to areas specifically designated for that purpose. 2. Provide these areas with adequate waste disposal receptacles for liquid as well as solid waste. 07/2006 01566-3 of 5 CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION 3 Clean and inspect maintenance and repair areas daily 4 Stabilize the area with coarse aggregate. 5 Maintain grade to prevent surface water from flowing over the area. 6. Place plastic matting, packed clay, tar paper, or other impervious material to prevent contamination of soil in the area. 7 Isolate areas of contaminated soil or other materials to facilitate proper removal and disposal. C Where effective control measures are not feasible,equipment shall be taken off-site for maintenance and repair 3.07 WASTE COLLECTION AND DISPOSAL A Conduct operations in conformance with the plan provided in Section 01562—Waste Material Disposal and utilize such control measures,described in this Section,as may be necessary to eliminate or significantly reduce the discharge of possible water pollutants from the Project Site as a result of waste collection and disposal. B Keep receptacles and waste collection areas neat and orderly to the extent possible. Waste shall not be allowed to overflow its container or accumulate from day-to-day Locate trash collection points where they will least likely be affected by concentrated storm water runoff. 3.08 WASHING AREAS A Vehicles such as concrete delivery trucks or dump trucks and other construction equipment shall not be washed at locations where the runoff will flow directly into a watercourse or storm water conveyance system. Preventative measures may include .the following practices. 1 Designate special areas for washing vehicles. 2. Locate these areas where the wash water will spread out and evaporate or infiltrate directly into the ground, or where the runoff can be collected in a temporary holding or seepage basin. 3 Beneath wash areas construct a gravel or rock base to minimize mud production. B Construct washing areas under the provisions of Section 01550 — Stabilized Construction Exists. 3.09 STORAGE AND USAGE OF POTENTIAL WATER POLLUTANTS A Store and use potential water pollutants such as pesticides,fertilizers,distillate fuels, lubricants, solvents, cements, paints, acids, caustics, and other toxic substances in accordance with manufacturers' guidelines, Material Safety Data Sheets, and with local, state, and federal regulations. 07/2006 01566-4 of 5 CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION B Isolate these substances in areas where they are to be stored,opened or used such that they will not cause pollution of runoff from the Project Site. Preventative measures may include the following practices 1 Stabilize the area with coarse aggregate. 2. Store containers on raised platforms. 3 Place plastic matting, packed clay, tar paper, or other impervious material to prevent contamination of soil in the area. 4 Provide protective cover or weather proof enclosure. 5 Minimize accidental spillage. 6. Keep containers tightly closed. 7 Periodically inspect containers for leakage. 8. Maintain grade to prevent surface water from flowing over the area. 9 Provide berms, filter fabric fences or barriers, or sediment basins. 10 Designate washing areas for containers and other items that have come in contact with potential water pollutants. C Avoid overuse of substances such as pesticides and fertilizers which could produce contaminated runoff. 3.10 SANITARY FACILITIES A Provide the Project Site with adequate portable toilets for workers in accordance with Section 01500—Temporary Facilities and Controls,and applicable health regulations. B Control areas where sanitary facilities are located so that sewage or chemicals will not be washed directly into receiving streams or storm water conveyance systems by using one or more of the following measures. 1 Inspect the facilities daily 2. Service the facilities as often as necessary to maintain cleanliness and prevent overflows. 3 Stabilize the area with coarse aggregate 4 Maintain grade to prevent surface water from flowing over the area END OF SECTION 07/2006 01566-5 of 5 CITY OF PEARLAND TRENCH SAFETY_SYSTEM Section 01570 TRENCH SAFETY SYSTEM. 1.0 GENERAL 1.01 SECTION INCLUDES A. Trench safety system for the construction of trench.excavations. B Trench safety system for excavation of utilities, excavation of structures, and embankment which fall under provisions of federal, state, or local excavation safety laws. C. References to Technical Specifications 1 Section 01200—Measurement&Payment Procedures 2. Section 01350—:Submittals D Referenced Standards. 1 Occupational Safety and Health Administration(OSHA) E. Definitions. 1 Trench. A narrow excavation(in relation to its depth)made below the surface of the ground. In general,the depth is greater than the width,.but the width of a trench(measured at the bottom) is not greater than 15 feet. 2. Trench safety system requirements apply to larger open.excavations if the. erection of structures or other mstallations limits the space between the excavation slope and the installation to dimensions equivalent to:a trench as defined. 3 Trench safety systems include both Protective Systems and Shoring Systems but are.not limited to sloping, sheetmg,trench boxes or trench shields, slide rail systems, sheet pilmg, cribbing,bracing, shoring,.dewatering or diversion of water to provide adequate drainage. 5/2013 01570- 1 of 5 CITY OF PEARLAND. TRENCH SAFETY SYSTEM a. Protective System. A method of protecting employees from cave-ins, from material that could fall or roll from an excavation face or into an excavation, or from the collapse of an adjacent structure. b. Shoring System. A structure, which supports the sides of an excavation, to prevent cave-ins, maintain stable soil conditions, or to prevent movements of the ground affecting adjacent installations or improvements. c. Special Shoring: A shoring system meeting Special Shoring Requirements for locations identified on the Plans. 4 Competent Person- one who is capable of identifying existing and predictable hazards m the surroundings or working conditions which are unsanitary,hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them. 1.02 MEASUREMENT AND PAYMENT A. Measurement for trench safety systems used on utility excavations is on a linear foot basis,measured along the centerline of the trench. Payment for trench safety systems includes payment for manholes and other line structures. B Unless indicated in as a Bid Item,no separate payment will be made for shoring systems under this Section. Include cost in Bid Items for trench safety systems. C. If shown on the Plans and included in Section 00300—Bid Proposal as a separate Bid Item, Measurement and Payment for Special Shoring system mstallation for trench excavation is on a square foot basis,measured and completed in place. D Unless indicated as a Bid Item, no separate payment will be made for trench safety systems used on structural excavations under this Section. Include cost for trench safety system used on structural excavations in applicable structure installation. E. Unless indicated as a Bid Item, no separate payment will be made for trench safety systems used on roadway excavation or embankment under this Section. Include cost m applicable Sections. F Refer to Section 01200—Measurement&Payment Procedures. 1.03 SUBMITTALS A. Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit a safety plan specifically for the construction of trench excavation,excavation of utilities, excavation of structures, and embankment which fall under provisions of 5/2013 01570-2 of 5 CITY OF PEARLAND TRENCH SAFETY SYSTEM federal, state, or local excavation safety laws. Design the Trench Safety Plan to be in accordance with OSHA Standards - 29CFR governing the presence and activities of individuals working in and around trench excavations, and in accordance with any Special Shoring requirements at locations shown on the Plans. Include in the plan, submittal of-the contact information for the Competent Person. C. Have Shop Drawings for trench safety systems sealed, as required by OSHA, by a Professional Engineer, licensed by the State of Texas, retained and paid by the Contractor 1.04 REGULATORY REQUIREMENTS A. Install and maintain trench safety systems m accordance with the provision of Excavations,Trenching,and Shoring,OSHA Standards-29 CFR,Part 1926,Subpart P, as amended,mcludmg Final Rule,published in the Federal Register Vol.54,No.209 on Tuesday, October 31, 1989 The sections that are incorporated into these Technical Specifications,by reference,include Standard 1926.650—652. B A reproduction of the OSHA Standards — 29 CFR mcluded in Subpart P — "Excavations"from the Federal Register Vol. 54,No. 209 is available upon request to Contractors bidding on the Work. The Owner assumes no responsibility for the accuracy of the reproduction. The Contractor is responsible for obtaining a copy of this section of the Federal Register C. Include in the Trench Safety Program measures that establish compliance with the standard interpretation of the General Duty Clause,Section 5.(a)(1),of the Occupational Safety and Health Act of 1970—20 USC 654 which states, "Employers must shore or otherwise protect employees who walk/work at the base of an embankment from possible collapse." D Legislation that has been enacted by the State of Texas with regard to Trench Safety Systems is hereby incorporated,by reference, into these specifications. Under Texas Statutes, refer to Chapter 756 of the Health and Safety Code, SUBCHAPTER C. TRENCH SAFETY E. Reference matenals,if developed for this Work, will be issued by the Engmeer along with the Bid Documents,mcludmg the following: 1 Geotechmcal mformation obtamed for use m design of the trench safety system. 2. Special Shoring Requirements. 1.05 INDEMNIFICATION A. Contractor shall indemnify and hold harmless the Owner, its employees, and agents, from any and all damages, costs(including,without limitation,,legal fees,court costs, and the cost of investigation),judgments or claims by anyone for injury or death of 5/2013 01570-3 of 5 CITY OF PEARLAND TRENCH SAFETY SYSTEM persons resulting from the collapse or failure of trenches constructed under this Contract. B Contractor acknowledges and agrees that this indemnity provision provides indemnity for the Owner in case the Owner is negligent either by act or omission in providing for trench safety, including, but not limited to safety program and design reviews, inspections,failures to issue stop work orders, and the hiring of the Contractor C. Review of the safety program by the Engineer will only be in regard to compliance with the Contract Documents and will not constitute approval by the Engineer nor relieve Contractor of obligations under state and federal trench safety laws. 2.0 PRODUCTS - Not Used (3.0 EXECUTION 3.01 INSTALLATION A. Install and mamtam trench safety systems in accordance with provisions of OSHA Standards—29 CFR. B Specially designed trench safety systems shall be installed in accordance with the Contractor's trench excavation safety program for the locations and conditions identified in the program. C. Install Special Shoring at the locations shown on the Plans. D Obtain verification from a Competent Person,defined in this Section and as identified in the Contractor's Trench. Safety Program, that trench boxes and other pre- manufactured systems are certified for the actual installation conditions. 3.02 INSPECTION A. Conduct daily mspections by Contractor or Contractor's independently retamed consultant, of the trench safety systems to ensure that the installed systems and operations meet OSHA Standards—29 CFR and other personnel protection regulations requirements. B If evidence of possible cave-ins or slides is apparent, immediately stop work in the trench and move personnel to safe locations until necessary precautions have been taken to safeguard personnel. C. Maintain a permanent record of daily mspections. 5/2013 01570-4 of 5 CITY OF PEARLAND TRENCH SAFETY SYSTEM 3.03 FIELD QUALITY CONTROL A. Verify specific applicability of the selected or specially designed trench safety systems to each field condition encountered on the Work. END OF SECTION 5/2013 01570-5 of 5 CITY OF PEARLAND MATERIAL AND EQUIPMENT Section 01600 MATERIAL AND EQUIPMENT 1.0 GENERAL 1.01 SECTION INCLUDES A Requirements for transportation, delivery, handling, and storage of materials and equipment. B References to Technical Specifications. 1 Section 01566—Source Controls for Erosion &Sedimentation 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this work is a component. 1.03 PRODUCTS A Products Means material,equipment,or systems forming the Work. Does not include machinery and equipment used for preparation,fabrication,conveying and erection of the Work. Products may also include existing materials or components designated for reuse. B Do not reuse materials and equipment,designated to be removed,except as specified by the Contract Documents. C Provide equipment and components from the fewest number of manufacturers as is practical, in order to simplify spare parts inventory and to allow for maximum interchangeability of components. For multiple components of the same size,type or application,use the same make and model of component throughout the Work. 1.04 TRANSPORTATION A Make arrangements for transportation, delivery, and handling of equipment and materials required for timely completion of the Work. B Transport and handle products in accordance with instructions. C Consign and address shipping documents to the proper party giving name of Project, street number, and City Shipments shall be delivered to the Contractor 1.05 DELIVERY A Arrange dehvenes of products to accommodate the Construction Schedule and in ample time to facilitate inspection pnor to installation. Avoid deliveries that cause lengthy storage or overburden of limited storage space. 07/2006 01600- 1 of 3 CITY OF PEARLAND MATERIAL AND EQUIPMENT B Coordinate deliveries to avoid conflict with Work and conditions at the Project Site and to accommodate the following. 1 Work of other contractors or the Owner 2. Limitations of storage space. 3 Availability of equipment and personnel for handling products. 4 Owner's use of premises. C Have products delivered to the Project Site in manufacturer's original, unopened, labeled containers. D Immediately upon delivery, inspect shipment to assure: 1 Product complies with requirements of Contract Documents. 2. Quantities are correct. 3 Containers and packages are intact; labels are legible. 4 Products are properly protected and undamaged. 1.06 PRODUCT HANDLING A Coordinate the off-loading of materials and equipment delivered to the Project Site. If necessary to move stored materials and equipment during construction, Contractor shall relocate materials and equipment at no additional cost to the Owner B Provide equipment and personnel necessary to handle products, including those provided by the Owner, by methods to prevent damage to products or packaging. C Provide additional protection during handling as necessary to prevent breaking scraping, marring, or otherwise damaging products or surrounding areas. D Handle products by methods to prevent over bending or overstressing. E Lift heavy components only at designated lifting points. F Handle materials and equipment in accordance with Manufacturer's recommendations. G Do not drop, roll, or skid products off delivery vehicles. Hand carry or use suitable materials handling equipment. 1.07 STORAGE OF MATERIAL A Store and protect,materials in accordance with manufacturer's recommendations and requirements of these Technical Specifications. Control storage of potential water pollutants in conformance with Section 01566 — Source Controls for Erosion & Sedimentation. B Make necessary provisions for safe storage of materials and equipment. Place loose soil materials,and materials to be incorporated into the Work to prevent damage to any part of the Work or existing facilities and to maintain free access at all times to all parts of the Work and to utility service company installations in the vicinity of the Work. 07/2006 01600-2 of 3 CITY OF PEARLAND MATERIAL AND EQUIPMENT C Keep materials and equipment neatly and compactly stored in locations that will cause a minimum of inconvenience to other contractors, public travel, adjoining owners, tenants, and occupants. Arrange storage in a manner to provide easy access for inspection. D Provide adequately ventilated, watertight storage facilities with floor above ground level for materials and equipment susceptible to weather damage. E Restrict storage to areas available on the construction site for storage of material and equipment as shown on Plans or approved by the Project Manager F Provide off-site storage and protection when on-site storage is not adequate. G Do not use lawns, grass plots, or other private property for storage purposes without written permission of the owner or other person in possession or control of such premises. Damage to lawns,sidewalks,streets or other improvements shall be repaired or replaced to the satisfaction of the Project Manager H Protect stored materials and equipment against loss or damage. I Store materials in manufacturers'unopened containers. J Materials delivered and stored along the line of the Work shall be not closer than 3 feet to any fire hydrant. Public and private drives and street crossings shall be kept open. K The total length which materials may be distributed along the route of construction at any one time is 1000 lineal feet,unless otherwise approved in writing by the Project Manager 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 07/2006 01600-3 of 3 CITY OF PEARLAND PRODUCT OPTIONS AND SUBSTITUTIONS Section 01630 PRODUCT OPTIONS AND SUBSTITUTIONS 1.0 GENERAL 1.01 SECTION INCLUDES A Options for making product or process selections. B Procedures for proposing equivalent construction products or processes,including pre- approved, and approved products or processes C References to Technical Specifications 1 Section 01350—Submittals 1.02 SUBMITTALS A Make Submittals required by this and related Sections under the provisions of Section 01350—Submittals. 1.03 DEFINITIONS A Product: Means,materials,equipment,or systems incorporated into the Work.Product does not include machinery and equipment used for production,fabrication,conveying, and erection of the Work. Products may also include existing materials or components designated for re-use. B Process. Any proprietary system or method for installing system components resulting in an integral, functioning part of the Work. For this Section, the word Product includes Processes. 1.04 SELECTION OPTIONS A Pre-approved Products. Products of certain manufacturers or suppliers are designated in the Technical Specifications as"pre-approved" Products of other manufacturers or suppliers will not be acceptable under this Contract and will not be considered under the submittal process for approving alternate products. B Approved Products. Products of certain manufacturers or suppliers designated in the Technical Specifications followed by the words "or approved equal" Approval of alternate products not listed in the Technical Specifications may be obtained through provisions of this Section and Section 01350—Submittals. The procedure for approval of alternate products is not applicable to Pre-approved Products. C Product Compatibility To the maximum extent possible,provide products that are of the same type or function from a single manufacturer,make, or source. Where more than one choice is available as a Contractor's option, select a product which is compatible with other products already selected, specified, or m use by the Owner 07/2006 01630- 1 of 3 CITY OF PEARLAND PRODUCT OPTIONS AND SUBSTITUTIONS 1.05 CONTRACTOR'S RESPONSIBILITY A Furnish information the Engineer deems necessary to judge equivalency of the alternate product. B Pay for laboratory testing as well as any other review or examination cost needed to establish the equivalency between products which enables the Engineer to make such a judgment. C If the Engineer determines that an alternate product is not equivalent to that named in the Technical Specifications,the Contractor shall furnish one of the specified products. 1.06 ENGINEER'S REVIEW A Alternate products may be used only if approved in writing by the Engineer The Engineer's determination regarding acceptance of a proposed alternate product is final. B Alternate products will be accepted if the product is judged by the Engineer to be equivalent to the specified product or to offer substantial benefit to the Owner C The Owner retains the right to accept any product deemed advantageous to the Owner, and similarly, to reject any product deemed not beneficial to the Owner 1.07 SUBSTITUTION PROCEDURE A Collect and assemble technical information applicable to the proposed product to aid in determining equivalency as related to the Approved Product specified. B Submit a written request for a product to be considered as an alternate product along with the product information within fourteen(14)days after the Effective Date of the Agreement. C After the submittal period has expired, requests for alternate products will be considered only when a specified product becomes unavailable because of conditions beyond the Contractor's control. D Submit 5 copies of each request for alternate product approval. Include the following information. 1 Complete data substantiating compliance of proposed substitution with Contract Documents. 2. For products. a. Product identification,including manufacturer's name and address. b Manufacturer's literature with product description, performance and test data, and reference standards. c. Samples, as applicable. d. Name and address of similar projects on which product was used and date of installation. Include the name of the Owner, Architect/Engineer, and installing contractor 07/2006 01630-2 of 3 CITY OF PEARLAND PRODUCT OPTIONS AND SUBSTITUTIONS 3 For construction methods a. Detailed description of proposed method. b Shop Drawings illustrating methods. 4 Itemized comparison of proposed substitution with product or method specified. 5 Data relating to changes in Construction Schedule 6. Relationship to separate contracts,if any 7 Accurate cost data on proposed substitution in comparison with product or method specified. 8. Other information requested by the Engineer E Approved alternate products will be subject to the same review process as the specified product would have been for Shop Drawings, Product Data, and Samples. 2.0 PRODUCTS - NotUsed 3.0 EXECUTION - NotUsed END OF SECTION 07/2006 01630-3 of 3 i CITY OF PEARLAND STARTING SYSTEMS Section 01750 STARTING SYSTEMS 1.0 GENERAL 1.01 SECTION INCLUDES A Starting systems. B Demonstration and instructions. C Testing, adjusting, and balancing. D References to Technical specifications 1 Section 01350—Submittals 2. Section 01430—Contractor's Quality Control 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit a written report that equipment or system has been properly installed and is functioning correctly 2.0 PRODUCTS - NotUsed 3.0 EXECUTION 3.01 PREPARATION A Contractor shall conduct all start-up operations under this Contract in conformance with Section 01430—Contractor's Quality Control. B Coordinate schedule for start-up of various equipment and systems. C Notify Engineer 7 days pnor to startup of each item. D Verify that each piece of equipment or system has been checked for proper lubrication, drive rotation, belt tension, control sequence, or other conditions which may cause damage. E Verify that tests, meter readings, and specified electrical charactenstics agree with those required by the equipment or system manufacturer 07/2006 01750- 1 of 2 CITY OF PEARLAND STARTING SYSTEMS F Verify wiring and support components for equipment are complete and tested. G Execute start-up under Contractor's supervision in accordance with manufacturer's instructions. H When specified in individual specification sections,require manufacturer to provide authorized representative to be present at site to inspect,check and approve equipment or system installation prior to and during start-up,and to supervise placing equipment or system in operation. 3.02 DEMONSTRATION AND INSTRUCTIONS A Demonstrate operation and maintenance of products to Owner two weeks minimum prior to date of Substantial Completion. B Utilize operation and maintenance manuals as basis for instruction. Review contents of manual with Owner in detail to explain all aspects of operation and maintenance. C Demonstrate start-up, operation, control, adjustment, trouble-shooting, servicing, maintenance, and shutdown of each item of equipment at agreed-upon times, at equipment location. D Prepare and insert additional data in operations and maintenance manuals when need for additional data becomes apparent during instruction. 3.03 TESTING,ADJUSTING,AND BALANCING A Contractor shall start, test, adjust, balance, and provide reports on all installed equipment as provided for in this section. B Owner may also appoint, employ, and pay for services of an independent firm to perform testing, adjusting, and balancing. Reports will be submitted by the independent firm to the Owner indicating observations and results of the tests and mdicating compliance or non-compliance with specified requirements and with the requirements of the Contract Documents. C Owner's employment of an independent firm shall not relieve the Contractor's responsibility under this section. END OF SECTION 07/2006 01750-2 of 2 CITY OF PEARLAND PROJECT RECORD DOCUMENTS Section 01760 PROJECT RECORD DOCUMENTS 1.0 GENERAL 1.01 SECTION INCLUDES A Maintenance and Submittal of Record Documents and Samples. B References to Technical Specifications 1 Section 01350—Submittals 2. Section 01770—Contract Closeout 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this and related Sections under the provisions of Section 01350—Submittals. 1.04 MAINTENANCE OF DOCUMENTS AND SAMPLES A Maintain one copy of Record Documents at the Project Site in accordance with Section 00700— General Conditions of Agreement, 3 02 "Keeping Plans and Specifications Accessible" B Store Record Documents and Samples in field office if a field office is required by Contract Documents, or in a secure location. Provide files,racks, and secure storage for Record Documents and Samples. C Label each document "PROJECT RECORD" in neat, large,printed letters. D Maintain Record Documents in a clean,dry,and legible condition. Do not use Record Documents for construction purposes. E Keep Record Documents and Samples available for inspection by Engineer 1.05 RECORDING A Record information concurrently with construction progress. Do not conceal any work until required information is recorded. B Plans, Change Orders, and Shop Drawings Legibly mark each item to record all actual construction, or "as built" conditions,including: 1 Measured horizontal locations and elevations of underground utilities and appurtenances,referenced to permanent surface improvements. 07/2006 01760- 1 of 2 CITY OF PEARLAND PROJECT RECORD DOCUMENTS 2. Elevations of underground utilities referenced to bench marks utilized for the Work. 3 Field changes of dimension and detail. 4 Changes made by modifications. 5 Details not on original Plans. 6. References to related Shop Drawings and Modifications. C Record information with a red pen or pencil on a set of drawings indicated as the Record Document Set,provided by Engineer 2.0 PRODUCTS - NotUsed 3.0 EXECUTION A Deliver Record Documents and Samples to Owner in accordance with Section 01770— Contract Closeout. END OF SECTION 07/2006 01760-2 of 2 CITY OF PEARLAND CONTRACT CLOSEOUT Section 01770 CONTRACT CLOSEOUT 1.0 GENERAL 1.01 SECTION INCLUDES A Closeout procedures including final submittals such as operation and maintenance data, warranties, and spare parts and maintenance materials. B References to Technical Specifications 1 Section 01350—Submittals 2. Section 01760—Project Record Documents 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1.04 CLOSEOUT PROCEDURES A Comply with Section 00700 — General Conditions of Agreement regarding Final Completion and Final Payment when Work is complete and ready for Engineer's final inspection. B Provide Record Documents under provisions of Section 01760 — Project Record Documents. C Complete or correct items on punch list,with no new items added. Any new items will be addressed during warranty period. D The Owner will occupy portions of the Work as specified in Section 00700—General Conditions of Agreement. E Contractor shall request Final Inspection at least two weeks pnor to Final Acceptance. 1.05 FINAL CLEANING A Execute final cleaning prior to final inspection. B Clean debris from drainage systems. C Clean Project Site; sweep paved areas,rake clean landscaped surfaces. 09/2009 01770- 1 of 2 CITY OF PEARLAND CONTRACT CLOSEOUT D Remove waste and surplus materials, rubbish, and temporary construction facilities from the Project Site following the final test of utilities and completion of the Work. 1.06 OPERATION AND MAINTENANCE DATA A Submit Operations and Maintenance data under provisions of Section 01350 — Submittals. 1.07 WARRANTIES A Provide one original of each warranty from Subcontractors, Suppliers, and Manufacturers. B Provide Table of Contents and assemble warranties in 3-ring/D binder with durable plastic cover C Submit warranties prior to Final Application for Payment. 1 Warranties shall commence in accordance with the requirements of Section 00700—General Conditions of Agreement, 1 09 "Substantially Completed" 2.0 PRODUCTS - NotUsed 3.0 EXECUTION Contractor shall diligently pursue completion of the items and activities contained in the Contract Close Out and Project Record Document sections of the project manual. Notwithstanding any performance of warranty work,the work of Contract Closeout shall be complete within thirty (30) days of the date of Final Completion and Acceptance of the work. END OF SECTION 09/2009 01770-2 of 2 CITY OF PEARLAND TECHNICAL SPECIFICATIONS DIVISION 2 TECHNICAL SPECIFICATIONS DIVISION 2 SITE WORK 07/2006 CITY OF PEARLAND SITE PREPARATION Section 02200 SITE PREPARATION 1.0 GENERAL 1.01 SECTION INCLUDES A Removal of topsoil, stripping and stockpiling, clearing and grubbing. B Removal and disposal of waste materials, excess materials, debris and trash. C Removal of obstructions. D Excavation and fill. E Salvaging of designated item. F References to Technical Specifications. 1 Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3 Section 01450—Testing Laboratory Services 4 Section 01500—Temporary Facilities and Controls 5 Section 02255 —Bedding,Backfill and Embankment Material 6. Section 02330—Embankment 7 Section 01140—Contractor's Use of Premises G Referenced Standards. 1 American Society for Testing and Materials (ASTM) a. ASTM D 4318, "Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils" 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. B If Site Preparation is included as a Bid Item,measurement will be based on the Units shown in Section 00300 — Bid Proposal and in accordance with Section 01200 — Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit embankment material sources and product quality information in accordance this Section. 07/2006 02200- 1 of 4 CITY OF PEARLAND SITE PREPARATION 1.04 TESTING A. Testing and analysis of product quality, material sources, or field quality shall be performed by an independent testing laboratory provided by the Owner under the provisions of Section 01450 —Testing Laboratory Services and as specified in this Section. 1.05 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices described in Section 01500—Temporary Facilities and Controls. 2.0 PRODUCTS 2.01 MATERIALS A Contractor shall provide materials used as embedment, backfill, back-dressing, and embankment identified on the Plans in accordance with Section 02255 — Bedding, Backfill and Embankment Material. 3.0 EXECUTION 3.01 CLEARING AND GRUBBING. A Clear Project Site of trees,shrubs,and other vegetation,except for those designated by Owner to be left standing. B Use only hand methods for grubbing inside drip line of trees designated to remain. C Completely remove stumps,roots,and other debris protruding through ground surface. 1 On areas required for roadway, channel, or structural excavation, remove stumps, 2" diameter or larger limbs and roots, to depth of 2 feet below lower elevation of excavation. 2. On areas required for embankment construction, remove 2" diameter limbs, stumps and roots to depth of 2 feet below ground surface 3 Trees and stumps may be cut off as close to natural ground as practicable on areas which are to be covered by at least 3 feet of embankment D Fill depressions caused by clearing and grubbing operations with satisfactory soil material, unless further excavation or earthwork is indicated. 1 Place fill material in horizontal layers not exceeding 6 inches loose depth,and thoroughly compact to density equal to adjacent original ground. E Complete operations by bulldozing,bladmg,and grading so that prepared area is free of holes,unplanned ditches, abrupt changes m elevations and irregular contours,and preserve drainage of area. 1 Blade entire area to prevent ponding of water and to provide drainage,except in areas to be immediately excavated 07/2006 02200-2 of 4 CITY OF PEARLAND SITE PREPARATION 3.02 TOPSOIL STRIPPING AND STOCKPILING A Obtain approval of topsoil quality before excavating and stockpiling. B Excavate topsoil for esplanades and areas to receive grass or landscaping from areas to be further excavated. C Topsoil Stripping: 1 Remove growths of grass from areas before stripping. 2. Topsoil is defined as surface soil found of depth of not less than 4 inches. 3 Strip topsoil to depths encountered. 4 Perform stripping in a manner to prevent intermingling of topsoil with underlying sterile subsoil and remove objectionable materials,including clay lumps, stones over 2 in.in diameter, weeds,roots,leaves, and debris. 5 Where trees are designated by Owner to be left standing,stop topsoil stripping at extreme limits of tree drip line to prevent damage to main root system. D Topsoil Stockpiling: 1 Stockpile in areas designated on Plans. 2. Construct storage piles to freely drain surface water 3 Cover storage piles, if required to prevent wind-blown dust. 4 Stockpile topsoil to depth not exceeding 8 feet. Stockpile in a manner to prevent erosion. 3.03 UNSUITABLE MATERIAL A Undercut, remove, and replace material which Engineer designates as unsuitable for subsequent construction. B Material used to replace unsuitable material shall be suitable material from site excavation or as indicated on Plans. 3.04 EXCAVATION AND FILL A Depressed site areas shall be filled usmg material from high areas, insofar as practicable. B When fill obtained from high areas is exhausted, fill to indicated rough grade elevations under roadways with"Structural Fill"and open areas not under structures or roadways with "General Fill", or as indicated on Plans. C Place and compact fill in accordance with Section 02330—Embankment. 3.05 SALVAGEABLE ITEMS AND MATERIAL A Items designated by Engineer to be salvaged are to be carefully removed,so as to cause no damage to the salvaged items and delivered to Owner's storage yard. 07/2006 02200-3 of 4 CITY OF PEARLAND SITE PREPARATION 3.06 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with _ Section 01140—Contractor's Use of Premises. END OF SECTION 07/2006 02200-4 of 4 CITY OF PEARLAND SITE DEMOLITION Section 02220 SITE DEMOLITION 1.0 GENERAL 1.01 SECTION INCLUDES A Demolishing and removing existing pavements, structures, equipment and materials only to the extent as indicated on the Plans. B Removing concrete paving, asphaltic concrete pavement, and base courses. C Removing concrete curbs, concrete curb and gutters, sidewalks and driveways. D Removing pipe culverts and sewers. E Removing miscellaneous structures of wood, plastics, metals, concrete, masonry, or combination of concrete and masonry, etc. F Disposing of demolished materials and equipment. G References to Technical Specifications 1 Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3 Section 01500—Temporary Facilities and Control 4 Section 01100—Summary of Work 5 Section 01730—Cutting and Patching 6. Section 01140—Contractor's Use of Premises 7 Section 01562—Waste Material Disposal 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item, no separate payment will be made for removing and disposing of existing pavement and structures under this Section. Include cost for removing and disposing of existing pavement and structures in Bid Items for which this Work is a component. B If indicated as a Bid Item,measurement will be as follows 1 Measurement for removing and disposing of concrete base and surfacing,and removing asphaltic surfacing,is on a square yard basis measured between lips of gutters. 2. Measurement for removing and disposing of cement stabilized shell base course, with or without asphalt surfacing,is on a square yard basis. 3 Measurement for removing and disposing of concrete base and surfacing with curbs,is on a square yard basis measured from back to back of curbs. Payment includes removal of all base,asphaltic surfacing,concrete pavement,esplanade curbs, curb and gutters, and paving headers. 04/2008 02220- 1 of 5 CITY OF PEARLAND SITE DEMOLITION 4 Measurement for removing and disposing of concrete pavement is on a square yard basis measured from back to back of curbs. 5 Measurement,for removing and disposing of monolithic curb and gutter, removing monolithic concrete curb,and removing concrete curb,is on a lineal foot basis measured along the face of the curb 6. Measurement for removing and disposing of concrete sidewalk and driveway is on a square yard basis. 7 Measurement for removing and disposing of miscellaneous concrete and masonry removal is on a cubic yard basis of the structure in place. 8. Measurement for removing and disposing of pipe culverts and sewers is on a lineal foot basis for each diameter of type of pipe removed. 9 Measurement for removing and disposing of unlisted materials shall be on the lump sum,basis. C No payment will be made for work outside maximum payment limits indicated on Plans, or in areas removed for Contractor's convenience. D Refer to Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS 1 A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit proposed methods, equipment, materials and sequence of operations for demolition. Describe coordination for shutting off,capping,and removing temporary utilities. Plan operations to minimize temporary disruption of utilities to existing facilities or adjacent property C Submit proposed demolition and removal schedule for approval. Notify Engineer in writing at least 48 hours before starting demolition. D Submit an approved copy of demolition schedule to Engineer prior to commencement of demolition operations. E Obtain a permit for building demolition, as required. 1.04 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices'described in Section 01500—Temporary Facilities and Controls. B The Contractor shall be responsible for safety and mtegrity of adjacent structures and shall be liable for any damage due to movement or settlement. Provide proper framing and shoring necessary for support. Cease operations if an adjacent structure appears to be endangered. Resume demolition only after proper protective measures have been taken. 04/2008 02220-2 of 5 CITY OF PEARLAND SITE DEMOLITION 1.05 OWNERSHIP OF MATERIAL AND EQUIPMENT A Materials and equipment designated for reuse or salvage are listed in Section 01100— Summary of Work. Protect items designated for reuse or salvage from damage during demolition,handling and storage. Restore damaged items to satisfactory condition. B Materials and equipment not designated for reuse or salvage become the property of the Contractor 1.06 STORAGE AND HANDLING A Store and protect materials and equipment designated for reuse until time of installation. B Deliver and unload items to be salvaged to storage areas indicated on Plans. C Remove equipment and materials not designated for reuse or salvage and all waste and debris resulting from demolition from site. Remove material as work progresses to avoid clutter 2.0 PRODUCTS 2.01 EQUIPMENT AND MATERIALS FOR DEMOLITION A Use equipment and materials approved as_prescribed in this Section, 1.03"Submittals' B Use of a"drop hammer"must have the Engineer's prior approval. 3.0 EXECUTION 3.01 EXAMINATION A Prior to demolition, make an inspection with Engineer to determine the condition of existing structures and features adjacent to items designated for demolition. B Engineer will mark or list existing equipment to remain the property of the Owner C Do not proceed with demolition or removal operations until after the joint inspection and subsequent authorization by Engineer D Stop demolition and notify Engineer if underground fuel storage tanks, asbestos, PCB's, contaminated soils, or other hazardous materials are encountered. 3.02 UTILITY SERVICES A Follow rules and regulations of authorities or companies having jurisdiction over communications,pipelines, and electrical distribution services. B Notify and coordinate with utility company and adjacent building occupants when temporary interruption of utility service is necessary 04/2008 02220-3 of 5 CITY OF PEARLAND SITE DEMOLITION C When required by the Work, cutting, patching, and fitting of Work to existing facilities,accommodating installation or connection of Work with existing facilities,or uncovering Work for access, inspection, or testing shall be performed in accordance with Section 01730—Cutting and Patching 3.03 MECHANICAL WORK ITEMS A Mechanical removals consist of dismantling and removing existing piping, pumps, motors,water tanks,equipment and other appurtenances. It includes cutting,capping, and plugging required to restore use of existing utilities. B Remove existing process,water,chemical,gas,fuel oil and other piping not required for new work. Take out piping to the limits shown or to a point where it will not interfere with the new work. Piping not indicated to be removed or which does not interfere with new work shall be removed to the nearest solid support,capped,and the remainder left in place. Purge chemical and fuel lines and tanks. Verify that such lines are safe prior to removal or capping. C Where piping that is to be removed passes through existing walls, cut and cap piping on each side of the wall. Use cap appropriate for pipe material to be capped. Provide fire-rated sealant for walls classified as fire-rated. D When underground piping, which is not located in the public right-of-way, is to be altered or removed,cap the remaining piping. Abandoned underground piping may be - left in place unless it interferes with new work or is shown or specified to be removed. Piping less than 15 inches in diameter may be plugged and abandoned in place. For piping 15 inches in diameter and greater to be abandoned,fill with sand,pressure grout or other approved method and plug with concrete or brick masonry bulkhead. E Remove waste and vent piping to points shown. Plug pipe and cleanouts and plugs. Where vent stacks pass through an existing roof that is to remain,remove the stack and patch the hole in the roof,making it watertight. Comply with requirements of existing roof installer so as to maintain roof warranty F Conform to applicable codes when making any changes to plumbing and heating systems. 3.04 ELECTRICAL WORK ITEMS A Electrical removals consist of disconnecting and removing existing switchgear, distribution switchboards,control panels,bus duct,conduits and wires,panel boards, lighting fixtures, and miscellaneous electrical equipment. B Remove existing electrical equipment and fixtures to prevent damage to allow continued operation of existing systems and to maintain the integrity of the grounding systems. 04/2008 02220-4 of 5 CITY OF PEARLAND SITE DEMOLITION C Remove poles and metering equipment, if designated for removal on the Plans. Coordinate electrical removals with the power company, as necessary Verify that power is properly de-energized and disconnected. D Where shown or otherwise required, remove wiring in underground duct systems. Verify function of wiring before disconnecting and removing. Plug ducts which are not to be reused at entry to buildings. E Changes to electrical systems shall conform to applicable codes. 3.05 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. B Remove from the site all items contained in or upon the structure not designated for reuse or salvage in accordance with this Section and Section 01562—Waste Material Disposal. C Follow method of disposal as required by regulatory agencies. END OF SECTION 04/2008 02220-5 of 5 CITY OF PEARLAND TOPSOIL Section 02910 TOPSOIL 1.0 GENERAL 1.01 SECTION INCLUDES A Furnishing and placing topsoil for finish grading and for seeding, sodding, and planting. B References to Technical Specifications. 1 Section 01200-Measurement and Payment Procedures 2. Section 01350—Submittals 3 Section 01450—Testing Laboratory Services 4 Section 01500—Temporary'Facilities and Controls 5 Section 02200—Site Preparation 6. Section 01140—Contractor's Use of Premises 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for topsoil under this Section. Include cost in Bid Items for which topsoil is a component. B If topsoil is included as a Bid Item,measurement will be based on the units shown in Section 00300—Bid Proposal and in accordance with Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit product quality,material sources, and field quality information in accordance with this Section. 1.04 TESTING A Testing and analysis of product quality, material sources, or field quality shall be performed by an independent testing laboratory provided by the Owner under the provisions of Section 01450 —Testing Laboratory Services and as specified in this Section. 1.05 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices described in Section 01500—Temporary Facilities and Controls. 07/2006 02910- 1 of 3 CITY OF PEARLAND TOPSOIL 2.0 PRODUCTS 2.01 TOPSOIL A Topsoil shall be fertile, friable, natural sandy loam surface soil obtained from excavation or borrow operations having the following characteristics 1 pH value of between 5.5 and 6.5 2. Liquid limit: topsoil not exceed 50 3 Plasticity index. 10 or less. 4 Gradation. maximum of 40 percent with a passing the#280 sieve. B Topsoil shall be reasonably free of subsoil,clay lumps,weeds,non-soil materials and other litter or contamination. Topsoil shall not contain roots,stumps,and stones larger than 2 inches. C Obtain topsoil from the top material from naturally well drained areas where topsoil occurs at a minimum depth of 4 inches and has similar characteristics to that found at the placement site. Do not obtain topsoil from areas infected with a growth of, or reproductive parts of nut grass or other noxious weeds. 3.0 EXECUTION 3.01 EXAMINATION A Verify that excavation and embankment operations have been completed to correct lines and grades. 3.02 TOPSOIL STRIPPING AND SOTCKPILING A Conform to topsoil stripping and stockpiling requirements of Section 02200 — Site Preparation. 3.03 PLACEMENT A Contractor shall conduct erosion control practices described in Section 01566-Source Controls for Erosion and Sedimentation during topsoil placement operations. B For areas to be seeded or sodded, scarify or plow existing surface material to a minimum depth of 4 inches,or as indicated on the Plans. Remove any vegetation and foreign inorgamc material. Place 4 inches of topsoil on the loosened material and roll lightly with an appropriate lawn roller to consolidate the topsoil. C Increase depth of topsoil to 6 inches when placed over cement stabilized sand used as bedding and backfill material. D For areas to receive bushes or trees,excavate existing material and place topsoil to the depth and dimensions shown on the Plans. 07/2006 02910-2 of 3 CITY OF PEARLAND TOPSOIL E Remove spilled topsoil from curbs, gutters, and, paved areas and dispose of excess topsoil in accordance with requirements of Section 01140 — Contractor's Use of Premises. 3.04 PROTECTION OF THE WORK A Protect and maintain topsoil until a vegetative cover is established. B Repair areas damaged by Contractor's operations at no cost to Owner END OF SECTION J 07/2006 02910-3 of 3 CITY OF PEARLAND HYDROMULCH SEEDING Section 02921 HYDROMULCH SEEDING 1.0 GENERAL 1.01 SECTION INCLUDES A Seeding, fertilizing, mulching, and maintaining areas of commercial, industrial, or undeveloped land disturbed during construction and not paved or designated to be paved, or as indicated on Plans. B References to Technical Specifications. 1 Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3 Section 01500—Temporary Facilities and Controls 4 Section 02910—Topsoil 5 Section 02255—Bedding, Backfill, and Embankment Materials 6. Section 01140—Contractor's Use of Premises 1.02 MEASUREMEN AND PAYMENT A Measurement for hydromulch seeding is on a per acre basis,measured and complete in place. B Payment for hydromulch seeding shall include all labor, materials, equipment, and preparation necessary for application and maintenance. C No payment shall be made for hydromulch seeding used in restoration of areas disturbed by Contractor outside the limits of construction. D Refer to Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit certification from supplier that each type of seed conforms to these specification requirements and the requirements of the Texas Seed Law Certification shall accompany seed delivery C Submit a certificate stating that fertilizer complies with these specification requirements and the requirements of the Texas Fertilizer Law 1.04 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices described in Section 01500—Temporary Facilities and Controls. 07/2006 02921 - 1 of 4 CITY OF PEARLAND HYDROMULCH SEEDING 2.0 PRODUCTS 2.01 MATERIALS A Topsoil. Conform to material requirements of Section 02910—Topsoil. B Bank Sand. Conform to material requirements of Section 02255—Bedding,Backfill, ;and Embankment Materials. C Seed. Conform to U.S Department of Agriculture rules and regulations of the Federal Seed Act and the Texas Seed Law Seed shall be certified 90 percent pure and furnish 80 percent germination and meet the following requirements 1 Rye: Fresh, clean, Italian rye grass seed (lollium multi-florum), mixed in labeled Proportions. As tested, minimum percentages of impurities and germination must be labeled. Deliver in original unopened containers. 2. Bermuda. Extra-fancy, treated, lawn type common bermuda (Cynodon dactylon). Deliver in original,unopened container showing weight,analysis, name of vender, and germination test results. 3 Wet, moldy, or otherwise damaged seed will not be accepted. D Fertilizer Dry and free flowing,inorganic,water soluble commercial fertilizer,which is uniform in composition. Deliver in unopened containers which bear the manufacturers guaranteed analysis. Caked,damaged,or otherwise unsuitable fertilizer will not be accepted. Fertilizer shall contain minimum percentages of the following elements Nitrogen. 10 Percent Phosphoric Acid. 20 Percent Potash. 10 Percent E Mulch.Virgin wood cellulose fibers from whole wood chips having a minimum of 20 percent fibers 0.42 inches(10.7 mm)in length and 0.01 inches(0.27 mm)in diameter. Mulch shall be dyed green for coverage verification purposes. F Soil Stabilizer "Terra Tack" 1 or approved equal. G Weed control agent: Pre-emergent herbicide for grass areas, "Benefin" or approved equal. 3.0 EXECUTION 3.01 PREPARATION A Do not start or perform work under conditions that are not satisfactory to perform tasks due to inclement or impending inclement weather B After the areas to receive hydromulch seeding have been brought to grade,rake out any foreign organic or inorganic material, including stones, hard clay lumps, and other debris. 07/2006 02921 -2 of 4 CITY OF PEARLAND HYDROMULCH SEEDING C Level with Bank Sand or Topsoil, as approved by the Engineer D Loosen the subgrade by discing or by scarifying to a depth of at least 4 inches. E Place and compact a layer of topsoil in accordance with requirements of Section 029-10 —Topsoil. F Surface of topsoil shall be smooth and free of weeds,rocks,and other foreign material immediately before applying hydromulch seeding. 3.02 APPLICATION A Seed. Apply uniformly at the following rates for type of seed and planting date. APPLICATION PLANTING TYPE RATE DATE POUNDS/A Hulled Common Bermuda Grass 98/88 40 Jan 1 to Mar 31 Unhulled Common Bermuda Grass 98/88 40 Hulled Common Bermuda Grass 98/88 40 Apr 1 to Sep 30 Hulled Common Bermuda Grass 98/88 40 Unhulled Common Bermuda Grass 98/88 40 Oct 1 to Dec 31 Annual Rye Grass(Gulf) 30 B Fertilizer Apply uniformly at a rate of 500 pounds per acre. C Mulch. Apply uniformly at a rate of 50 pounds per 1000 square feet. D Soil stabilizer Apply uniformly at a rate of 40 pounds per acre. E Weed control agent: Apply at manufacturer's recommended rate prior to Hydromulching. F Suspend all operations under conditions of drought,excessive moisture,high winds,or extreme or prolonged cold. Obtain the Engineer's approval before resuming operations. 3.03 MAINTENANCE A Maintain grassed areas by watering,fertilizing,weeding,and trimming as required to establish and sustain 70% acceptable vegetative cover B For areas seeded in the fall, continue maintenance the following spring until an acceptable lawn is established. 3.04 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. 07/2006 02921 -3 of 4 CITY OF PEARLAND HYDROMULCH SEEDING 3.05 PROTECTION OF THE WORK A Protect and maintain grassed areas a minimum of 90 days, or as required to establish an acceptable lawn. B Once a lawn is established, protect and maintain it until completion of the Work. C Replace seeded areas damaged by Contractor's operations at no cost to Owner END OF SECTION 07/2006 02921 -4 of 4 CITY OF PEARLAND SODDING Section 02922 SODDING 1.0 GENERAL 1.01 SECTION INCLUDES A Sodding areas of residential lawns disturbed during construction and not paved or designated to be paved, or as indicated on Plans. B References to Technical Specifications 1 Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3 Section 01500—Temporary Facilities and Controls 4 Section 02910—Topsoil 5 Section 02255 —Bedding,Backfill, and Embankment Materials 6. Section 01140—Contractor's Use of Premises C Definitions 1 Lawn- ground covered with fine textured grass kept neatly mowed. 2. Sod-blocks, squares, strips of turf grass, and adhering soil used for vegetative planting. 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for utility or paving. B If sodding is included as a Bid Item,,measurement will be based on the units shown in Section 00300—Bid Proposal and in accordance with Section 01200—Measurement and Payment Procedures. C No payment shall be made for sodding of restoration areas disturbed by Contractor outside the limits of construction. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit material sources and product quality information in accordance with this Section. C Submit a certificate stating that fertilizer complies with these specification requirements and the requirements of the Texas Fertilizer Law 07/2006 02922- 1 of 4 CITY OF PEARLAND SODDING 1.04 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices described in Section 01500—Temporary Facilities and Controls. 2.0 PRODUCTS 2.01 MATERIALS A Topsoil. Conform to material requirements of Section 02910—Topsoil. B Bank Sand. Conform to material requirements of Section 02255—Bedding,Backfill, and Embankment Materials. C Fertilizer. Available nutrient percentage by weight: 12 percent nitrogen, 4 percent phosphoric acid, and 8 percent potash, or 15 percent nitrogen, 5 percent phosphoric acid, and 10 percent potash. D Weed and Insect Treatment: Provide acceptable treatment to protect sod from weed and insect infestation. Submit treatment method to the Engineer for approval. All insect and disease control shall be installed within guidelines set forth by the Structural Pest Control Board of the State of Texas E Water Potable, available on-site through Contractor's water trucks. Do not use private resident's water 2.02 SOD A Species Bermuda (Cynodon Dactylon), Buffalo (Buchloe Dactyloides), or St. Augustine to match existing or as directed. B Contents. 95 percent permanent grass suitable to climate in which it is to be placed, not more than 5 percent weeds and undesirable grasses, good texture, free from obnoxious grasses,roots, stones and foreign materials. C Size. 12 inch wide strips,uniform in thickness(2 inch minimum with clean-cut edges. D Sod is to be supphed and maintained in a healthy condition as evidenced by the grass being a normal, green color 3.0 EXECUTION 3.01 PREPARATION A Do not start work until conditions are satisfactory Do not start work during inclement or impending inclement weather Perform Sodding only when weather and soil conditions are deemed by Engineer to be suitable for proper placement. 07/2006 02922-2 of 4 CITY OF PEARLAND SODDING B After the areas to receive sod are brought to grade, rake out any foreign organic or inorganic material, including stones,hard clay lumps and other debris. C Level with Bank Sand or Topsoil, as approved by the Engineer D Loosen the subgrade by discing or by scarifying to a depth of at least 4 inches. E Place and compact topsoil in accordance with requirements of Section 02910 — Topsoil. Top soil shall be free of weeds and foreign material immediately before sodding. F Spread 2-inch (±1")layer of Bank Sand over prepared topsoil. G Prior to placing sod,rake areas smooth,free from unsightly variations,bumps,ridges, or depressions, and completely free from stones,hard clay lumps and other debris. H Apply fertilizer at a rate of 25 lbs/1000 SF Apply after raking soil surface and not more than 48 hours prior to laying sod. Mix thoroughly into upper 2 inches of soil. Lightly water to aid in dissipation of fertilizer 3.02 APPLICATION A Lay sod with closely fitted joints leaving no voids and with ends of sod strips staggered. Sod shall be laid within 24 hours of harvesting. B After sod is laid, irrigate thoroughly to secure 6-inch minimum penetration into soil below sod. C Tamp and roll sod with approved equipment to eliminate minor irregularities and to form close contact with soil bed immediately after planting and watering. Submit type of tamping and rolling equipment to be used to the Engineer for approval, prior to construction. 3.03 MAINTENANCE A Maintenance Period. 1 Begin maintenance immediately after each section of grass sod is installed and continue for a 30-day period from date of Substantial Completion. 2. Re-sod unacceptable areas. 3 Water, fertilize, control disease and insect pests,mow, edge,replace unacceptable materials, and perform other procedures consistent with good horticultural practice to ensure normal,vigorous and healthy growth. All disease control shall be installed within guidelines set forth by the Structural Pest Control Board of the State of Texas. 4 Notify Engineer 10 days before end of maintenance period for inspection. B Watenng: 1 Water lawn areas once a day with minimum 1/2 inch water for the first 3 weeks after area is sodded. 07/2006 02922-3 of 4 CITY OF PEARLAND SODDING 2. After 3-week period, water twice a week with 3/4 inch of water each time unless comparable amount has been provided by rain. 3 Make weekly inspections to determine moisture content of soil unless soil is in frozen condition. 4 Water in the morning to enable soil to absorb maximum amount of water with minimum evaporation. C Mowing: 1 Mow sod at intervals which will keep grass height from exceeding 3-1/2 inches. 2. Set mower blades at 2-1/2 inches. 3 Do not remove more than one-half of grass leaf surface. 4 Sodded areas requiring mowing within 1 month after installation, shall be mowed with a light-weight rotary type mower The sod shall be mowed only when dry and not in a saturated or soft condition. 5 Remove grass clippings during or immediately after mowing. D Fertilizer and Pest Control. 1 Evenly spread fertilizer composite at a rate of 40 pounds per 5,000 square feet or as recommended by manufacturer Fertilizer shall not be placed until 2 weeks after placement of sod. 2. Restore bare or thin areas by topdressing with a mix of 50 percent sharp sand and 50 percent sphagnum peat moss. 3 Apply mixture 1/4 to 1/2 inch thick. 4 Treat areas of heavy weed and insect infestation as recommended by treatment manufacturer 3.04 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140-Contractor's Use of Premises. 3.05 PROTECTION OF THE WORK A Protect and maintain sod in good condition until 30 days after Substantial Completion. B Replace sod damaged by Contractor's operations at no cost to Owner END OF SECTION 07/2006 02922-4 of 4 CITY OF PEARLAND SUPPLEMENTAL TECHNICAL SPECIFICATIONS SUPPLEMENTAL TECHNICAL SPECIFICATIONS CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS SECTION 09950 COATINGS FOR WATER STORAGE TANKS 1.00 GENERAL 1 01 WORK INCLUDED A. Furnish labor, materials, equipment and incidentals necessary to apply protective coatings to material and equipment as specified herein, including the preparation of surfaces prior to application of coatings. B Protective coatings shall be applied to the following surfaces. 1 Tank interior surfaces. C The following shall not be coated and shall be protected from daps, overspray, etc. unless indicated otherwise. 1 Stamless steel piping,materials and equipment. 2. Galvanized steel piping, materials and equipment. 3 Aluminum materials and equipment. 4 Safety climb devices. 5 Interior electrical items. D Contain,treat, and dispose of any dust, spray, drainage, or spillage resulting from coating operations. It shall be the Contractor's responsibility to determine if the matenals to be disposed of are classified as Hazardous Waste. Disposal of waste, hazardous or otherwise, shall be in accordance with applicable regulations. The Contractor shall be aware of and understand the regulations concerning disposal of waste generated by coating operations. 1 02 EXISTING CONDITIONS A. The Contractor shall acquaint himself with the hazards of the work mcluding,but not limited to corroded components, high wind velocity, fire potentials caused by sparks from Contractor's torches, spark damage to property, and the proximity to overhead electrical lines, to residences,businesses, streets, etc. Failure to do so will not relieve the Contractor from all obligations described m the Drawings or Specifications. B Contractor is responsible for testing the existing coatings for lead, cadmium and chromium content prior to beginning Work. Contractor shall submit the results of the tests to the Owner as Record Data. 1 03 QUALITY ASSURANCE A. Acceptable Manufacturers. Products which comply with the Contract Documents and are manufactured by the following companies will be acceptable. Products from other coating manufacturers shall not be submitted and will not be considered. 03/2016 09950- 1 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 1 Tnemec Company, Inc. 2. Carbohne. 3 The Sherwin-Williams Company 4 PPG Industries. B Contractor's Qualifications. Contractors must be qualified in this line of work and have a minimum of 5 years' experience coating potable water storage tanks and in the application of the protective coatings of the types specified herein. Submit a list of recent projects and names of references for those projects. C Contractor shall hold current SSPC QP 2 certification for Field Application to Complex Industrial and Manne Structures. Contractor shall submit QP 2 certification documents as Record Data. D Contractor's Superintendent/Foreman shall have a minimum of 5 years' experience with coating storage tanks. Superintendent/Foreman shall be onsite at all times while Work indicated within this Section is underway Submit a list of recent projects and names of references for those projects. E. The Contractor shall provide workers who perform professional and quality work and who are experienced and knowledgeable in surface preparation,mixing and application of high performance coating systems. F Product Quality 1 Use only the coatings specified m this Section. Use only those thinners and solvents recommended by the manufacturer, only in the amounts necessary to produce the manufacturer's recommended spreading rate, and in amounts not exceedmg the maximum quantities stated in the manufacturer's literature. 2. The coating material shall not show excessive settling in a freshly opened full can and shall be easily re-dispersed with a paddle to a smooth,homogeneous state. It shall show no curdling, livering, caking, or color separation and shall be free of lumps or skim surfaces. G Testing: Protective coatings shall be applied under quality control procedures,which include inspection of surface preparation and for each coat applied. Do not proceed with the next step until the Owner's representative has approved the previous step. The Contractor shall be solely responsible for testing for this Section, at no further cost to the Owner The Owner's representative shall also make such tests, if it is considered necessary Cooperate with the Owner,providing equipment, scaffolds, and other equipment as requested by the Owner's Representative. H. Testing Equipment: Furnish the testmg apparatus necessary for testing surface preparation, environmental conditions and coatings as specified. I. Testing Equipment: Contractor shall furnish and have the following testing apparatuses on-site during construction for the Owner's use. 1 One set of U S. Department of Commerce thickness calibration plates, certified by the National Bureau of Standards,to test dry film thickness. 03/2016 09950-2 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 2 Wet-film thickness gauges. Provide two to Owner's representative. Each painter shall keep one to test paint as it is applied. 3 One dry-film thickness gauge, Mikrotest III, 0 -40 mils with calibration standard approved by the Bureau of Standards. 4 One Bacharach Sling Psychrometer,Model 12-7011 5 One Tinker and Rasor Model M 1 Holiday Detector and recommended wetting agent. 6 One set of SSPC VIS 1, 3 and 4 -Visual Standards as applicable. J The Contractor shall schedule a construction conference prior to any field work being completed. The meeting will be onsite and will include the Owner, Contractor, painting superintendent, Engineer, Owner's representative and Coating Manufacturer's Representative. At this meeting the coating plan and schedule will be reviewed in detail. 1 04 FIELD QUALITY CONTROL A. All work, including observations, shall be recorded daily by the CONTRACTOR. A copy of each daily report shall be placed in a file kept on the job site. Reports for the previous week shall be delivered to the office of the OWNER'S Representative by noon on each Monday or by noon on Tuesday if Monday is a holiday B Surface Profile Testing: 1 Provide a minimum of three sets of profile readings for the first 1,000 square feet. 2. Provide a minimum of two sets of profile readings for each additional 1,000 square feet. C Wet Film and Dry Film Thickness Testing: 1 Provide wet film tests during painting operations to assure proper thicknesses of coating are being applied. 2. The dry-film thickness for each coat shall be tested and be in conformance with SSPC-PA-2 with a Type 2 Electronic Gauge. Apply additional coats until the specified thickness is reached or exceeded for all coats. D Holiday Testing: 1 Contractor shall conduct holiday testing in the presence of the Owner's representative. 2. Holiday Testing shall be conducted using a wet sponge low voltage holiday detector in accordance with ASTM D5162. 3 One holiday test shall be performed on 100 percent of the intenor coating system following the application of the final coat and after all work is completed inside of the reservoir 4 During the wet sponge testing, defective areas shall be marked for repair and re- tested after repair work has been completed. 03/2016 09950-3 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 5 All touched up pinholes and re-coated areas shall cure for a mmimum of 7 days pnor to re-testing for holidays. 6 Holiday testing and re-testing shall continue until the interior surfaces are found to be holiday free. 7 The coating system must pass the holiday test regardless of the mil thickness existing. E. Contractor shall monitor and record ambient climatic conditions and interior reservoir conditions during surface preparation and coating as follows. 1 Temperature of both the sunny side and shady side of the reservoir shall be recorded periodically each day The reservoir surface temperatures,relative humidity, dry bulb, wet bulb and dew point temperatures,both interior and exterior(as appropnate), are to be recorded at least every 3 hours. 2. The dew point shall be measured by use of a sling psychrometer in conjunction with U S Department of Commerce Weather Bureau Psychometric Tables or with an electronic climate monitoring system approved by the Engineer 3 The Contractor shall use a.form approved by the Owner for recording this data. The completed forms shall be kept on the Site at all times from the time coating is first applied until the coating system is complete. F All Work, including observations, shall be recorded daily by the Contractor A copy of each daily report/log shall be placed in a file kept on the Site. Reports for the previous week shall be delivered to the office of the OWNER'S Representative by noon on each Monday or by noon on Tuesday if Monday is a holiday The reports shall include the following: 1 Date. 2. Project Manager's Name. 3 Contractor and Subcontractor name (where applicable). 4 Contractor's and or Owner's representatives name (where applicable) 5 Project Name. 6 Work Identification including: a Type of Work performed. b. Location of Work performed,indicated on generalized drawings of the reservoir, drawings shall include estimated ft2 area blasted and/or painted and approximate percentage of total ft2 area of surface being prepared and painted. Generalized drawmgs shall mclude: 1) Plan view of reservoir 2) Profile view of reservoir 3) Plate location. 4) North arrow 03/2016 09950-4 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 5) Any other drawings that will help to indicate location of Work performed. 7 Time of day each portion of the Work was started and finished. 8 Weather conditions, including corresponding time of day,before during and after Work begms including: a. Temperature (air and surface). b. Humidity/dew pomt. c. Wind velocity/direction. d. Remarks and results of Work. 9 Quality Control results for completed Work, including: a Compressed air blotter test performed at the start of each day and every 4 hours per ASTM D4285 b. Surface preparation visual checks. c. Profile checks utilizing replica tape. d Documentation of DFT's and areas tested per SSPC PA-2, Type 2 Gauge. e. Locations of holidays,repairs and touchups required, including documentation of the repair completion. 10 Contractor signature. G Owner's representative Field Quality Assurance Coordination. 1 Contractor shall provide a schedule for anticipated hold-points and shall notify the Owner's representative at least 7 days prior to any required inspections and confirmed 24 hours prior to inspection. Prior to scheduling an inspection, Contractor is responsible for reviewing Work and verifying it is ready for a threshold mspection. Once scheduled, if the Owner's representative finds the Project not ready for inspection any additional trips for re-inspection or inspection for retesting of failed tests shall be borne by the Contractor and deducted from the Contract Value by Change Order 2. Costs for additional inspection shall be billed at the following rates. :Position Per , Day Coating $825 Inspector a. Cost includes all travel and inspection expenses. b. Construction Contract Administration will be billed for actual effort per the rates established in Section 00800 "Supplementary Conditions." H. Field Quality Assurance: 1 Observations shall be conducted by the Owner's representative and/or a third party inspection company retained by the Engineer Final observations shall be 03/2016 09950-5 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS performed in the presence of the Owner or their Representative and the Contractor's superintendent. All matenals and equipment used in the accomplishment of testing are subject to observation at any time by the Owner's representative. Periodic observation times will be agreed upon by the Owner's representative and Contractor, and approved by the Owner 2. The Owner may conduct the tests and observations to verify the Coating Manufacturer's data. If the coating testing results fall below the test requirements or visual observation, the Owner reserves the right to have the Contractor change coating materials and/or Coating Manufacturers to a coating that will meet all the stated requirements in this Specification. 3 All steps of the coating system will be subject to observation pnor to progression to succeeding steps. Phases of observation shall include,but not limited to a Pre-cleaning(before surface preparation) survey of facilities to be primed. b. Durmg surface preparation and prior to coating application. c. During and immediately after each coating application. d Final coating observation. e. Substantial Completion/Pre-dismfection. 4 The Contractor shall not move or remove scaffolding, ladders or other fixtures necessary to provide proper observation until such Work has been observed and approved by the Owner's representative. 5 Any Work found to be deficient, damaged, or otherwise unacceptable shall be repaired in accordance with the Coatmg Manufacturer's latest written repair recommendations at no additional cost to the Owner 6 Owner's representative will make every attempt to minimize damage to newly coated areas during observation activities,but any damage caused, regardless of by whom, shall be repaired by the Contractor at no additional cost to the Owner 7 Observation and/or acceptance of Contractor's Work by Owner's representative(s)in no way releases Contractor from any of the terms and conditions of the Contract Agreement. 8 The following test and observations will be performed during coating operations. a Surfaces of all steel shall first be cleaned and observed by the Contractor's Supenntendent to ensure that all grease, oil, and other foreign matenals have been removed before coating. Any area found to be improperly cleaned, shall be redone to the Owner's representative's satisfaction. Final surface preparation shall be as outlmed in SSPC-SP1 through SP13 and WJ-1 through WJ-4, as specified. Prior to observation of all mtenor and exterior surfaces by Owner's representative, Contractor's Superintendent shall observe and confirm readiness for inspection. b. The pattern depth of the abrasive blasted surface shall be as specified by the Coating Manufacturer's wntten surface profile recommendations. The profile 03/2016 09950-6 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS shall be measured by a Testex Replica Tape. SSPC-VIS 1 and/or SSPC-VIS 3 shall serve as guides and in arbitration to determine the degree of surface preparation. Each and every square foot of the reservoir surface, interior and exterior, shall be prepared as per SSPC visual standards. c. Before and/or during blasting and coating operations, a field observation and possibly a field test of ventilation flow-rates may be performed by the Owner to verify that the ventilation requirements are being provided. d. Measurement of the dry film thickness shall be made in accordance with SSPC-PA2 with a Type 2 Electronic Gauge. Measurements of the actual dry film thickness of the various coating layers applied shall be made by the Owner's representative with assistance from the Contractor Final film thickness measurements shall be made at such locations as designated by the Owner and/or Owner's representative e. Holiday testing shall be conducted by the Contractor and observed by the Owner's representative. f All coatings submitted shall pass a 7-day chemical spot test to the following chemicals with no cracking,blistering or delamination. 1) 1,1,1 Trichloroethane. 2) Methyl Ethyl Keytone (MK). 3) Ethanol. 9 On days when blastmg and/or coating is being performed,the Owner's representative shall monitor and record ambient climatic conditions, and interior reservoir conditions as follows. a. Air temperature, steel surface temperature, humidity and dew point shall be measured and recorded by the Contractor prior to beginning of blasting and prior to application of coating, daily b. Surface temperature shall be measured using a surface thermometer c. Temperature of both the sunny side and shady side of the reservoir shall be recorded periodically each day The reservoir surface temperatures,relative humidity, dry bulb, wet bulb and dew point temperatures,both interior and exterior(as appropriate), are to be recorded at least every 3 hours. d. The dew point shall be measured by use of a sling psychrometer in conjunction with U S Department of Commerce Weather Bureau Psychometric Tables. 10 The Owner's representative shall use a form approved by the Owner for recording this data. The completed forms shall be kept on the Site at all times from the time surface preparation is initiated until the coating system is complete. The forms shall be submitted as Record Data on a weekly basis until coating is complete. 03/2016 09950-7 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 105 SUBMITTALS A. Submittals shall be in accordance with Section 01300 "Submittal Procedures." B The following Record Data is due prior to ordering the matenals. 1 Products and Manufacturer's Information. a Coating Manufacturer's color selection literature for coating materials and caulk. b. Sample warranty document for products. c. Provide certification from the manufacturer that all coatings will not contain more than 0 06 percent by weight of lead in the cured coating for each coat applied. d. Coating Manufacturer's Product Information and Material Safety Data Sheets (MSDS)for each coating and caulk material. Product Information shall include the following: 1) The Manufacturer's published instructions for use in specifying and applying all proposed coatings. 2) Application instructions written and published by the Coating Manufacturer 3) All limitations,precautions and requirements that may adversely affect the coating that may cause unsatisfactory results after the application or that may cause the coating not to serve the purpose for which it was intended, shall be clearly and completely stated in the instructions. Limitations and requirements shall include,but are not necessarily limited to the following: a). Surface preparation. b) Method(s) of application. c) Thickness of each coat(maximum and minimum DFT). d) Drying and curing time of each coat. e) Time (minimum and maximum) allowed between coats. f) Thinner and use of thinner g). Proper mixing of coating before application. h) Weather limitations during and after application(temperature and humidity,time weighted) i). Physical properties of coating, including percent solids content by volume. j) Equipment settings (air cap, fluid tip, equipment pressure settings, etc.). k) Pot life at various temperature and humidity conditions. 03/2016 09950-8 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS I). Provide documentation that interior coating system is compatible with the cathodic protection system. C The following Samples are required prior to ordering the materials 1 Three samples of selected coating colors for approval on 6-inch by 6-inch swatches. Label each swatch with the manufacturer's name, coating name/type, color name and number D The following Record Data is required prior to coating work: 1 Coating Plan. a. Anticipated coating process schedule by date, including dates when hold-point inspections are anticipated. Schedule shall indicate detailed activities on a daily basis. b. Detailed procedures and schedule for all pre-cleaning, surface preparation and application of coating, including touch-up and repair procedures for all coating systems. c. Recoat schedule on the submitted coating matenals. d. Data sheets complete with a graduated scale or curve,produced by the Coating Manufacturer,with curing characteristics and recommendations regarding complete coating curing. The data sheets and scales or curves shall include specific cure times over a wide range of temperatures and humidity e. Provide a written plan documenting how spent cleaning debris and/or paint over spray or droplets will be contained/confined to the jobsite and tank site during the surface preparation and coating application operations. Reasonable care shall be exercised by the Contractor to prevent damage, nuisance, or hazardous conditions to adjacent or nearby property Owners. Include all materials and method to be used for protection of exterior surfaces, and allow for recovery and disposal of paint scraps and blast media. f Provide written plan documenting how paint and/or abrasive damage to automobiles and property will be addressed, including a process for quick removal of the paint or abrasive, and how the Work will be accomplished(this shall not relieve the Contractor from the responsibility of setting claims for damage,but is intended to expedite and minimize said claims). g. If applicable,plan shall include methodology for protecting workers from exposure to lead and heavy metal based coatmgs,protection of ground surface from coating contamination and methodology for collecting, containing and disposing of hazardous material. 2. Provide documentation on proposed containment system for blasting and coating operations. 3 Provide documentation on heating or dehumidification system. a Calculations for dehumidification and ventilation requirements. b. Fans and their locations. 03/2016 09950-9 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS c. Dimensions of equipment. d Maximum capacities of equipment. e Emission control devices. f Method of filtration of exhausted tank air g. EMD- continuous electronic monitoring device. 4 Provide documentation on ventilation and filtration system. a. Calculations for ventilation requirements. b. Fans and their locations. c. Dimensions of equipment. d. Maximum capacities of equipment. e Emission control devices. f Method of filtration of exhausted tank air 5 The Contractor shall submit evidence of notification of the appropriate office of the Texas Commission on Environmental Quality(TCEQ)prior to abrasive blasting as required. Submit copies of any obtained permits. 6 Coating Manifest: Within 48 hours of coatmg delivery to the Site,the Contractor shall record the batch number stamped on each coating container and submit a typed list to the Owner's representative. Minimum information required is listed below a Date of delivery to job site. b. Name and signature of Superintendent recording the data. c. List of batch number including corresponding coating identification, color, and date of manufacture and volume of each container E. The following Certified Test Report(s) are required prior to coating work: 1 Atomic absorption testing for lead, chromium, cadmium, and arsenic if ferrous metal abrasives are to be used. Multiple tests may be required for shop and field blastmg operations. 2. MSDS sheets for all abrasive to be used on the Project. 3 Contractor's test results of existing coatings for total lead, chromium and cadmium. F Provide the following Record Data during the construction of the Project: 1 On a weekly basis, submit Contractor's Daily Reports. 2. Provide submittal for tank coatmg record decal. G Provide the following matenals to the Owner prior to final completion. 1 Liquid cleaner for removal of graffiti from treated surfaces. 03/2016 09950- 10 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 106 STANDARDS A. The applicable provisions of the following standards shall apply as if wntten here m their entirety Adhere to the latest standards and codes published by the following organizations. 1 American National Standards Institute (ANSI)• a ANSI/NSF Standard 61 -Drinking Water Components. 2. American Society for Testing and Matenals (ASTM). ASTM D523 Standard Test Method for Specular Gloss ASTM D610 Standard Test Method for Evaluating Degree of Rusted on Painted Surfaces ASTM Standard Practice for Calculation of Color Tolerances and D2244 Color Differences from Instrumentally Measured Color Coordinates ASTM Standard Test Methods for Evaluating the Degree of Chalking D4214 of Exterior Paint Films ASTM Standard Test Method of Indicating Oil and Water in D4285 Compressed Air _ ASTM E337 Standard Practice Test Method for Measuring Humidity with a Psychrometer ASTM E84- Standard Test Method for Surface Burning Characteristics of 03 Building Materials ASTM Standard Method for Pull-Off Strength of Coatmgs Testing D4541 Adhesion of Applied Coating Using Portable adhesion Tester 3 American Water Works Association(AWWA): AWWA Welded Steel Tanks for Water Storage D 100 AWWA Coating Steel Water Storage Tanks D102 AWWA Composite Elevated Tanks for Water D107 Storage AWWA \Disinfection of Water Storage Facilities C652 4 Consumer Product Safety Act,Part 1303 5 National Association of Corrosion Engineers (NACE International). Coating and Lining for Immersion Service: Chapter Safety, NACE TPC2 Chapter 2 Surface Preparation, Chapter 3 Curing, and Chapter 4 Inspection NACE Fabncation Details, Surface Finish Requirements, and Proper SP0178 Design Considerations for Tanks and Vessels to be Lined for Immersion Service 03/2016 09950- 11 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS NACE I Impressed Current Cathodic Protection of Internal Submerged SP0388 Surfaces of Carbon Steel Water Storage Tanks NACE Plastic Weld Comparator RP0178 NACE Discontinuity(Holiday) Testmg of Protective Coatings on RP0188 Conductive Substrates NACE Field Measurement of Surface Profile of Abrasive Blast RP0287 Cleaned Steel Surfaces Using a Replica Tape 6. Occupational Safety&Health Administration(OSHA): 1915.35 Standards - Painting 29CFR 1926.62 Standards—29 Lead CFR 7 Society for Protective Coatings (SSPC) SSPC-VIS 1 Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning SSPC-VIS 3 Guide and Reference Photographs for Steel Surfaces Prepared by Power and Hand Tool Cleaning SSPC-VIS 4 Guide and Reference Photographs for Steel Surfaces Prepared by Waterjetting SSPC Vol. 1 Good Painting Practices SSPC-AB1 Mineral and Slag Abrasives SSPC-AB2 Cleanliness of Recycled Ferrous Metallic Abrasives SSPC-AB3 Ferrous Metallic Abrasives SSPC-SP1 Solvent Cleaning SSPC-SP2 Hand Tool Cleaning SSPC-SP3 Power Tool Cleaning SSPC-SP5 White Metal Blast Cleaning SSPC-SP6 Commercial Blast Cleaning SSPC-SP7 Brush- Off Blast Cleaning SSPC-SP10 Near-White Metal Blast Cleaning SSPC-SP11 Power Tool Cleaning to Bare Metal SSPC-SP13 Surface Preparation of Concrete SSPC-SP WJ- Low-Pressure Water Cleaning(LP WC)water performed at 1 pressures less than 34-MPa(5,000 psig) SSPC-SP WJ- High-Pressure Water Cleaning(HP WC)performed at 2 pressures from 34 to 70-MPa(5,000 to 10,000 psig) SSPC-SP WJ- High-Pressure Waterjetting(HP WJ)performed at pressures 3 - from 70 to 210-MPa(10,000 to 30,000 psig) 03/2016 09950- 12 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS SSPC-SP WJ- Ultra High-Pressure Waterjetting(UHP WJ)performed at 4 pressures greater than 210-MPa(30,000 psig) SSPC-PA-1 Shop,Field and Maintenance Painting SSPC-PA-2 Measurement of Dry Film Thickness with Magnetic Gages SSPC-PA-3 Guide to Safety in Paint Application SSPC-Guide 6 Guide for Containing Surface Preparation Debris Generated (CON) During Paint Removal Operations SSPC-Guide Guide for Illumination of Industrial Painting 12 8 Texas Commission on Environmental Quality(TCEQ)- a. 30 TAC Chapter 111, Subchapter A, Division 3,Abrasive Blasting of Water Storage Tanks Performed by Portable Operations. b. 30 TAC Chapter 290 Subchapter D, Rules and Regulations for Public Water Systems. B In the event of a conflict between the published standards, codes, and this Section,the more stringent requirement shall govern. 1 07 DELIVERY AND STORAGE A. Deliver coating products to the Site in original unopened contamers,with manufacturer's label and batch number attached. Do not apply products until the Owner's field representative has approved the product for use. B. Use one location at each site for the storage of coating products. Protect the floor from spills and other damage. Protect the products from extreme heat or cold. Keep containers covered. Keep the storage rooms clean of trash and debris. Dispose of oily or used rags daily Take precautions to prevent fires. The storage of flammable liquids shall comply with the City, State, or other fire codes. 1 08 ENVIRONMENTAL CONTROL CONDITIONS A. Do not apply coatings under conditions that are unsuitable for the production of good results. Remove trash and debris from enclosed buildings and thoroughly clean prior to application of coatings. Do not begin application of coatings in areas where other trades are working, or where construction activities result in airborne dust or other debris. Do not apply coatings in conditions which do not conform to the recommendations of the coatings manufacturer B Coatings shall only be applied when conditions fall within the parameters listed m the manufacturer's printed data. C Do not apply any coatings when weather conditions are unfavorable. In the event that climatic conditions are not conducive for best results,postpone application of coatmgs until conditions conform to the manufacturer's recommendations and the provisions of this Section. 03/2016 09950- 13 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS D Do not apply coatings to a wet or damp surface in wet or damp weather conditions, or when there is dust in the air Surfaces exposed to direct sunlight shall be shaded by awnings or other protective devices while coatings are being applied. When necessary,provide temporary heating devices of a type that produces no fumes which will discolor the pamt system. E. Heating and Dehumidification(if necessary). 1 Dehumidification equipment may be used to control the environment in the reservoir wet area during surface preparation, coating application and coating cure. 2. Approved automatic real time monitoring equipment shall be provided. This equipment shall be used when no Contractor personnel are on site. 3 The Contractor shall furnish all labor,materials, equipment, fabrication and quality control inspections, and all other incidentals required to control and maintain the environment of the reservoir within the parameters stated in this Section and shall incorporate these and any other expenses into his bid. 4 The Owner reserves the rights, in the event the dehumidification equipment is not performing to the minimum requirements stated in this specification,to require the Contractor to modify and or add additional equipment to satisfy the conditions of this specification, at the sole cost to the Contractor 5 It is the Contractor's responsibility to provide adequate dehumidification equipment to meet this specification and Coating Manufacturer's requirements. 6 In lieu of dehumidification, Corrline CorrX products may be utilized per the manufacturer's wntten specifications. F Force Ventilation (if necessary). 1 Continuous forced fresh air ventilation shall be provided from beginning of the reservoir interior wet area surface preparation through final coating operations and coating curing. 2 Forced ventilation shall be supplied to the mtenor of the tank per the recoat time required by the coating manufacturer and at least 48 hours after the final coat has been applied. 3 Unless dehumidification equipment is used to provide ventilation of the reservoir interior,the roof vents and hatches shall be kept open and clear 4 All reservoir,pedestal, dry nser and dry well openings susceptible to emissions during blasting, cleaning, and coating operations shall be properly fitted and secured with suitable dust collection devices to reduce the release of emissions. 5 From the beginning of interior wet and/or dry coating application and until this coating is cured, the Contractor shall monitor the air for the lower explosion limit (LEL) as published in the Coating Manufacturer's product MSDS 03/2016 09950-14 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 6 During coating curing and when no coatings are being applied inside the reservoir, the equipment shall be sized so that it is capable of changing the volume of air inside the enure reservoir a minimum of 1.5 to 2.0 times per hour 7 Throughout the duration of ventilation, containment of blasting abrasives, removed coating, and applied coatings shall be maintained by use of proper filtration. 8 The ventilation system shall be in accordance with AWWA D102 and submitted to the Owner 9 Contractor is responsible for supplying, installing and maintaining the forced ventilation system. 10 Ventilation during interior abrasive blasting can be limited to one air exchange per hour 11 The above ventilation requirements are minimum requirements. It is the responsibility of the Contractor to verify that the flow rate provided through the tank meets the curing requirements of the Coating Manufacturer and those of the Owner Should additional ventilation be required by the Coating Manufacturer, the Contractor shall furnish additional ventilation at his expense. G Containment System(if necessary)• 1 Pnvate residences and public areas exist within 500 feet of the water storage tank site. Emissions from abrasive blasting operations shall be controlled as required by TAC 30, Chapter 111, Subchapter A,Division 3 2. Provide a minimum SSPC Guide.6 (CON) Class 2A containment system when dry abrasive blasting at the tank site. 3 The ground surrounding the tank shall be protected from all debris, emissions, dust, and other materials generated in the cleaning operations with a minimum of two layers of polyethylene covered with plywood or the same material used for the perimeter containment system. Provide documentation that these requirements have been adhered to 4 Containment is not required when blasting on the interior of a completely enclosed tank(i.e. roof is in place) as long as no visible emissions are created. 5 The Contractor shall ensure that no spent cleaning/blasting debris, dust, overspray, coatmg droplets, or emissions of any kind, escape to the atmosphere, the base of the tank, or adjacent buildings,private property, work sites,parking lots, etc 6 The Owner reserves the right to stop Work or require containment, additional containment or different containment methods if the Contractor's operations create a nuisance beyond the tank site property line in the sole opinion of the Owner, the Engineer, the Owner's representative, any regulatory agency, or neighbor All costs of providing an adequate containment system shall be included by the Contractor in the Base Bid. 03/2016 09950- 15 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 7 The Contractor shall be responsible for all materials that are used and for any apparatus used to contam dust emissions, debns, overspray, and coating droplets. The containment system attachments to the tank shall be designed by a licensed professional engineer(P.E.)registered in the State of Texas not to impose excessive loading on the tank. The Contractor shall submit the P.E. designed, stamped, and signed details of the containment system on the tank. The containment system will place additional loads on the tank that the tank was not originally designed for The Contractor shall reinforce the tank as necessary to prevent permanent deformation and to assure that no damage occurs to the tank. Any damage to the tank as a direct or indirect result of the containment system shall be repaired or sections replaced by the Contractor at no additional cost to the Owner Neither the Owner nor the Owner's Engineer assumes any responsibility for the structural ability of the tank to support the containment system. 8 If complete containment of the tank is utilized to contain all cleaning dust, debns, emissions,paint droplets, and paint overspray, the complete containment shall include a full bonnet. 9 If tarps are used as part of the containment system, the tarps shall be an impervious, solid, flame-resistant material,reinforced with a fiber mesh and shall allow as much light as possible to pass through the material. 10 If robotic or creeper-type cleaning devices are used,the robotic or creeper-type device shall meet the same containment criteria as that of the types of containment(lack of emissions). All overspray and paint droplets shall be contained on the tank site. 11 Review of the containment system for contaming the spent cleaning dust, debris, emissions, overspray, and coating droplets shall not warrant the structural integnty of the containment system and shall not warrant the structural integnty of the tank to support the containment system. Nor shall review of the containment system warrant the ability of the system to contain spent cleaning dust, debris, emissions, and overspray 12. Damage Contingency Plan. Prior to construction, the Contractor shall present a written plan for review by the Owner and Consultant concerning how dust and debris damage to automobiles will be removed. Approval of this plan shall not relieve the Contractor from responsibility of settling claims,but is intended as an avenue to expedite and minimize such claims. H. Dust Collection. 1 The dust collection system shall at a minimum meet the requirements of a Type J1 Air Filtration system, as specified in Section 5 4.5 1 of the SSPC-Guide 6 (CON). 2. Contractor shall design, furnish and maintain dust collection measures for the Project as required creating a negative pressure within the containment system and/or adequate air flow within the tank interior 3 The dust collection shall be operated during all abrasive blast cleaning and until the area is clean enough for coating application. The Contractor shall be 03/2016 09950- 16 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS responsible for all sizing, design of ductwork, etc.,based upon the Contractor's operations, number of blasters, duration of blasting, etc. 4 The Contractor shall also take precautions to avoid a vacuum from developing inside the tank, as even slight vacuum inside of the tank may cause damage to the tank. Dust socks are not allowed. I. Working Conditions. 1 Provide adequate lighting at any location that coatings are being applied or testing is performed. Illumination shall be of sufficient intensity to achieve good results. Provide explosion-proof lighting when required. 2. Temporary ladders and scaffolds shall conform to applicable safety requirements. Erect temporary scaffolds where needed to cover large areas. Provide ladders or scaffolding during testing procedures. 109 GUARANTEES A. Protective coating shall be guaranteed for a period of 1 year from the date of the Owner's acceptance of the Project. B Coating Manufacturer shall issue to the Owner, 1 year warranty for materials. C A warranty inspection shall be conducted in the eleventh month following the Project's Substantial Completion date. Any defective work discovered at this date shall be corrected by the Contractor in accordance with the Contract Documents at no additional cost to the Owner Other corrective measures may be required during the 1 year warranty period and the Owner may request corrective measures any time during the warranty period. Owner is only required to contact Contractor to initiate warranty work. 2.00 PRODUCTS 2.01 GENERAL COATING REQUIREMENTS A. All coatings shall be free of heavy metals such as arsenic,banum, chromium, selenium, silver, lead,mercury and cadmium. B All interior coatings and products used on interior wet surfaces (all surfaces within the tank bowl) shall be certified by the National Sanitation Foundation(NSF), standard 61, for direct contact with potable water C All coatings shall be applied in strict conformance with the Coatmg Manufacturer's published specifications and with this Section. D To insure coating compatibility, Contractor shall use products of a single Coating Manufacturer for all coatings applied to the reservoir and/or its components,unless prior approvals are obtained in writing from the Owner and the Coating Manufacturer E. All materials shall be delivered to the Site in onginal sealed containers with the date of manufacture and batch number stamped thereon by the Coating Manufacturer 03/2016 09950-17 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS Materials shall be subject to random observations by the Owner's representative at the Site. F No coating submitted or used on this Project shall have a VOC (volatile organic content)in excess of 360 grams/liter or 3 0 lbs./gal. G Pnmers factory-applied shall be those specified. Notify manufacturers which shop prime coats will be required in order to be compatible with field-applied finish coats. Where equipment is purchased which has the manufacturer's standard primer or a factory finish which is other than as specified in this Section,remove the factory- applied paint system or apply passivators or other special coatings as required to make the surface compatible with the finish coat specified. 2.02 COATING SCHEDULES A. IW-01 Tank Interior Wet Coating System(Welded Steel Tank at Liberty Dr). 1 Surface preparation. Field applied prime coat on new and existing steel. NACE No 2/SSPC-SP 10—Near-White Metal Blast Cleaning. 2. Application Method(s) Spray All weld seams, gaps, edges,bolts and difficult areas to coat shall receive a stripe coat. 3 Preconstruction Priming: a Preconstruction priming shall be in accordance with AWWA D102. Full removal of construction primer is not required if: 1) The primer is fully compatible with the specified paint system primer A letter from the paint manufacturer certifying compatibility shall be submitted with coating submittal. 2) The primer has been tested and certified for potable water contact in accordance with NSF/ANSI 61 b. Weld seams and bare steel shall be cleaned to NACE No 2/SSPC-SP 10— Near-White Metal Blast Cleaning. c. Areas with adherent preconstruction primer shall be cleaned to NACE No 4/SSPC SP-7—Brush-Off Blast Cleaning. d A frill field coat of the specified pnme coat shall be applied over the spot- cleaned bare steel and remaining preconstruction primer e Coating submittal shall include documentation from coating manufacturer indicating compatibility of preconstruction primer with specified coating system. 03/2016 09950-18 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 4 NSF 61 certified system(including all thinners and additives)to be one of the following and of the same manufacturer of all other coating products used on this Project: a. Sherwin-Williams. Coat Product DFT(mils) ' Color Prime Coat W Macropoxy 646 3 - 6 mils Mill White Stripe Coat Macropoxy 646 2 - 3 mils Contrasting PW Color Intermediate Coat Mac ropoxy 646 4 - 6 mils Light Blue Finish Coat W Macropoxy 646 5 - 6 mils Mill White Mimmum and Maximum DFT for 12 - 18 mils System b Carboline: Coat. Product DFT (mils) ; Color Prime Coat Carboguard 61 3 - 6 mils Mill White Stripe Coat Carboguard 61 2 - 3 mils Contrasting Color Intermediate Coat Carboguard 61 4 - 6 mils Light Blue Finish Coat Carboguard 61 5 - 6 mils Mill White Minimum and Maximum DFT for 12 - 18 mils System c. PPG- Coat, _ Product DFT (mils). - Color Prime Coat Amerlock 2 4 - 6 mils Mill White Stripe Coat Amerlock 2 2 -3 mils Contrasting Color Intermediate Coat Amerlock 2 4 - 6 mils Light Blue Fimsh Coat Amerlock 2 4 - 6 mils Mill White Minimum and Maximum DFT for 12 - 18 mils System d. Tnemec Coat Product ,DFT(mils) 'Color Prime Coat N140 Pota-Pox 3 - 6 mils Mill White Plus 03/2016 09950- 19 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS Coat Product DFT(mils): Color Stripe Coat N140 Pota-Pox 2 -3 mils Contrasting Plus Color • Intermediate Coat N140 Pota-Pox 4 - 6 mils Light Blue Plus _ _ Finish Coat N140 Pota-Pox 5 - 6 mils Mill White Plus Mimmum and Maximum DFT for System 12 - 18 mils B. IW-02 Tank Interior Wet Coating System(Bolted Steel Tank at Suburban Garden Rd): 1 Coating shall be 100 percent(98 percent±2 percent) solids coat and shall cover all edges,bridge all gaps and be monolithic and holiday free. 2. Surface preparation. Field applied pnme coat on new and existing steel. NACE No 2/SSPC-SP 10—Near-White Metal Blast Cleaning. 3 Application Method(s)• Spray All weld seams, gaps, edges,bolts and difficult areas to coat shall receive an initial stripe coat. 4 Preconstruction Priming: a Preconstruction priming shall be in accordance with AWWA D102. Full removal of construction primer is not required if: 1) The primer is fully compatible with the specified paint system primer A letter from the paint manufacturer certifying compatibility shall be submitted with coating submittal. 2) The primer has been tested and certified for potable water contact in accordance with NSF/ANSI 61 b. Weld seams and bare steel shall be cleaned to NACE No 2/SSPC-SP 10— Near-White Metal Blast Cleaning. c. Areas with adherent preconstruction pnmer shall be cleaned to NACE No 4/SSPC SP-7—Brush-Off Blast Cleaning. d A full field coat of the specified prime coat shall be applied over the spot- cleaned bare steel and remaining preconstruction primer e. Coating submittal shall include documentation from coatmg manufacturer indicating compatibility of preconstruction primer with specified coating system. 5 Coating manufacturer shall provide onsite training and direction to Contractor prior to beginning application of this coating type. If new crew members are added,manufacturer shall repeat training. Training shall be in the presence of the Owner and/or the Engmeer 03/2016 09950-20 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 6 NSF 61 certified system(including all thinners and additives)to be one of the following and of the same manufacturer of all other coating products used on this Project: a. Sherwin-Williams. Coat 'Product :; DFT(mils) Color Spray Stripe Sherflex Beige Coat S Sherflex 30 mils Single Coat S min. Beige b. Carboline: Coat Product DFT (mils) Color Spray Stripe Reactamine 760 Light Coat HB Tan Single Coat Reactamme 760 30 mils Light HB min. Tan c. PPG. Coat Product DFT(mils), . Color Spray Stripe Amerthane 490 Off White Coat Single Coat Amerthane 490 30 mils Off White min. d Tnemec Coat Product DFT'(mils) Color Spray Stripe Elasto-Shield Series Coat 406 Off White Single Coat Elasto-Shield Series 30 mils Off White 406 mm. 2 03 COATING REPAIR A. 100 percent solids epoxy gels may be used for spot repairs for areas where a faster cure or moisture cured application requires it. B All repairs in contact with potable water shall be NSF 61 approved. C Acceptable Products. 1 Raven Lining System,Aquata Poxy A-6 applied at 10 - 12 mils. 2. Approved Equal. 03/2016 09950-21 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 2.04 CAULK SCHEDULE A. IC—01 Tank Interior/Exterior System. 1 Sika Flex lA or Approved Equal. 2. Product shall be NSF 61 approved for contact with potable water 3 Color a Caulking within the interior of the tank shall be a contrasting color to the finish coat as approved by the Owner b. Exterior and exposed caulking color shall be approved by the Owner 4 Apply caulk in accordance with manufacturer's recommendation and as follows. a. Apply to flanges and dresser sleeves on pipes and valves after abrasive blasting or hand cleaning. Caulk shall be installed in the joints at a minimum of 1/2 inch deep filling the joints level but not outside or above the surfaces between the flanges and/or between the dresser-sleeves and pipe shall be filled. b. After application of the finish coat on the interior of the reservoir, apply caulking to seal roof laps, skip welded roof rafters, around bolts and on bolt threads and other areas not seal welded. 2.05 TANK FLOOR FLANGE SEALANT SCHEDULE A. The tank floor flange sealing system shall be'by Sherwin-Williams or approved equal. 1 Concrete Cracks, Spalled Concrete, Joints—cracks, spalled concrete, and joints shall be repaired to original condition prior to application of sealant. 2. Metal Surfaces shall be prepared as per SSPC-SP-6 Commercial Blast (minimum), anchor profile 2.0-4 0 mils. Prime coat with SW Macropoxy 646 Epoxy or approved equal applied at 4 0-6 0 mils DFT (extend primer as required over feathered edge of existing sound coating as required). Recoat time minimum 2 hrs at 77F prior to applying Polyspec 5050 or approved equal as listed below 3 Apply one coat of Polyspec 5050 Pnmer or approved equal at 2.0-3 0 mils DFT to all areas primed,recoat time over pnmer at min 2 hrs and max 36 hrs at 77F degrees apx. Install compressed backer rod into gaps between flange and concrete to a depth of%2 the width of the gap Thoroughly mix and apply the Polyspec 2235M or approved equal,tool into joint and smooth transition with the lip of the steel. Also install small 3"radius cove at the tank shell chine,with the mixed Polyspec 2235M or approved equal. Tape off area to be sealed. After Polyspec 2235M or approved equal is applied and minimum cure of 2.5 hours at 77F,brush apply the Polyspec 2282 Sealant or approved equal at 60-100 mils DFT Pull tape while coating is wet,use a method to pull towards the sealant,not away 4 Sherwin Williams Sealant System. 03/2016 09950-22 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS Coat` Product ,DFT;(mils)=; Color Pnmer for Bare Macropoxy 646 PW 4 - 6 mils Beige Steel/Concrete Primer/Polysulfide Polyspec 5050 Primer 2 - 3 mils Beige Polysulfide Polyspec 2235M Joint As Required Beige Sealant and Cove Application Polysulfide Polyspec 2282 Sealant 60 - 100 mils Beige Sealant 2.06 COLOR SELECTION A. Contractor shall submit drawdowns for Owner's review and approval of final color selection for all exterior coating systems. B Use a multi-color system coating for any surface receiving more than one coat. Each coat shall be tinted differently from the preceding coat in a manner that will allow the various coats to be easily distinguished. Colors shall generally be from light to dark shades,but the Contractor may have the option to select tint shades to insure coats will receive adequate coverage without bleeding or otherwise showing through the preceding coat. C Piping and equipment shall be color coded in accordance with the requirements of the Texas Commission on Environmental Quality(TCEQ) or as indicated above. 2 07 ABRASIVE MATERIALS A. Abrasive materials used shall be non-carcinogenic when properly used,properly graded,be sharp,have proper angularity, and be clean and free of contaminants including lead, chromium, cadmium, arsenic, chlorides, dirt, oil, etc., such as steel grit or approved equal. B All expendable abrasives shall meet SSPC-AB 1 and all abrasives shall meet the requirements of SSPC-AB 1, Class A for silica content with less than 1 percent silica by weight before blasting. C Steel grit shall meet the requirements of SSPC-AB 3, for new and re-manufactured steel abrasives. Any steel grit used on this Project shall be sampled before use by the Owner's representative and the Contractor Contractor shall have the samples sent to a laboratory for atomic absorption testing for total lead, cadmium, chromium and arsenic. The steel grit shall not be used until the results of the atomic absorption testing are submitted to the Owner and indicate that the total lead levels are less than 1000 ppm(<0 1 percent) Test shall be used for abrasives used in both shop and field blastmg. D The grade shall be of such size as to achieve an acceptable anchor pattern or surface profile as required by the Coating Manufacturer E. Silica sand shall not be used as a blast abrasive. 03/2016 09950-23 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS F Re-used abrasive shall meet SSPC-AB 2, Specification for Cleanliness of Recycled Ferrous Metallic Abrasives. G If lead is present within the existing coatings systems,the following additives may be used to stabilize the coating prior to disposal. 1 Pretox. 2. Blastox. 3.00 EXECUTION 3 01 GENERAL A. All matenals shall be handled and applied in accordance with the Coating Manufacturer's recommendations. B No coatings shall be applied while water is in the reservoir C All coating material for the exterior topcoat shall be mixed from one batch number Batching should occur so that the shelf life extends beyond the end of the Project. D All blasting and coating equipment shall be in first class condition and comply with all recommendations of the Coating Manufacturer and these specifications. The Owner reserves the right to have the Contractor immediately repair, modify or remove equipment.functioning poorly or creating a nuisance as determined by the Owner E. Do not apply any coating to machinery,piping, or other surfaces before testing has been completed and systems approved. Any damage to coatings resulting from subsequent corrective procedures shall be stripped back to bare metal and repainted with the appropnate paint system as directed by the Engineer F Surfaces which will be inaccessible after installation shall be coated prior to installation, or shall be coated and approved in stages as the Work is installed. G At least 7 days shall be allowed for drying of finished surfaces before any machinery can be placed into service. H. Do not apply coating over nameplates or other identification plaques. Mask such plates and keep protected. Remove tape and polish nameplates after painting is complete. I. Coating application procedures shall conform to the standards of craftsmanship as discussed in the Steel Structures Painting Manual,Volume 1 "Good Painting Practice" J All thinning shall be as per the Coating Manufacturer's recommendations. Use only those thinners expressly approved by the Manufacturer for the coatings used on this Project. All thinners used with interior surface coatings shall be those tested and approved by NSF in conjunction with the NSF approved coating matenals. Do not allow thinners to be stored in unmarked containers at any time. 03/2016 09950-24 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS K. Proper illumination equipment shall be provided by the Contractor in accordance with SSPC Guide 12. Explosion-proof lights and electrical equipment shall be provided. Whenever required by the Owner's representative and/or Owner, the Contractor shall provide additional illumination and necessary supports to cover all areas to be inspected. The level of illumination for inspection purposes shall be determined by the Owner's representative or Owner Project lighting shall not interfere with existing residences or schools. Complaints from adjacent residential neighbors shall require Contractor to modify lighting plan to aleve complaint. Project lighting is considered subsidiary work relating to vanous bid items of the Contract. L. The Contractor shall provide covers and plugs for the intake, discharge and drain piping at the point where the pipe enters the water compartment to prevent debris, or any other foreign matter from entering the water mams. The covers and plugs shall remain in place from beginning of the job until just prior to filling the reservoir for disinfection. M. Grating or grills shall be securely attached to all openings not otherwise secured at the end of work each day until work commences again. Gratings or grills shall be used on all openings until the reservoir is secured for service. Grates or grills shall be of at least 1/4-inch wire mesh, with a minimum of two square inch mesh openings and a maximum of six square inch openings, to allow adequate free air passage and reservoir protection. N The Engineer shall approve surfaces for application of coatmgs at each stage. Any material that is coated pnor to the Engineer's approval shall be stripped back to bear metal and repainted. 0 Cleaning and coating shall be scheduled such that dust and other materials from adjoining work will not contaminate wet or newly coated surfaces. P Roof plates shall be jacked off of rafters during abrasive blastmg and during coating operations. 3 02' PREPARATION A. Shop Surface Preparation. Clean and degrease surfaces pnor to abrasive blasting per SSPC-SP 1 Proposed method shall be documented in the coating plan. Prepare surfaces by abrasive blasting as specified and apply shop prime coat. Shop primed steel plates shall not have pnmer extended withm 4 inches along all edges to be welded. All pnmer within 4 inches of an area to be welded shall be removed pnor to welding. Welding of painted services will not be allowed. B Field Surface Preparation. After erection and pnor to touch-up priming, remove all surface contamination including dirt, dust, oil, and other foreign matter per SSPC-SP 1 All weld slag, spatter, rough welds and other sharp or rough areas shall be removed. All rusted, abraded and unpainted areas shall be abrasive blast cleaned as specified. Touch up pnme coat with primer as specified. C All applicable equipment shall be electrically grounded as required and shall have clean operating gauges, moisture traps, etc. 03/2016 09950-25 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS D Effective oil and water separators combmed with after coolers or deliquescent dryers shall be used in compressed air lines serving abrasive blasting operations to remove , detrimental oil and moisture from the air Compressors may be tested periodically by the Owner's representative for oil and water contamination of compressed air per ASTM D4285 All compressor units found to produce unacceptable amounts of oil and or water shall be replaced with a compressor that is acceptable. E. If the following conditions exist or are prevalent, surface preparation and coating shall be delayed or postponed until conditions are favorable. Each day's coating shall be completed in time to permit the film sufficient drying time prior to damage by atmospheric conditions or changes. No surface preparation shall begin or coating applied. 1 When the surface, air or material is below or above the Manufacturer's printed mstructions. 2. When surfaces are wet or damp 3 During weather conditions of rain, snow, fog or mist. 4 When the air and steel temperature is less-than or equal to 5o F above the dew point temperature. 5 If the relative humidity is above 85 percent. 6 When it is expected that the air and/or surface temperature will be below or above the Coating Manufacturer's recommended temperatures within 4 hours after applications of coating, minimum. Coating manufacturer may require additional time between application and temperature and weather changes. F All pre-assembled shop primed items shall be prepared in accordance with these specifications and inspected by the Owner's representative before and after priming. G For both immersion and non-immersion service, all sharp edges and welds shall be ground smooth to a rounded contour and all weld splatter shall be removed prior to abrasive blasting. H. Weld profiles shall conform to NACE RP0178, Profile `D' I. Abrasive Blasting: 1 Blasting abrasive may be left on the tank floor while painting the intenor roof and walls provided no paint is applied to the walls within 10 feet of the floor 2. Shrouding or recovery of all blast material will be mandatory during all exterior blasting. 03/2016 09950-26 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 3 The TCEQ has established,under Regulation I, Control of Air Pollution and Visible Emissions from Particulate Matter, Standard 30 TCEQ 111 131, 111 133, 111 135, 111 137, and 111 139 titled"Abrasive Blasting of Water Storage Tanks Performed by Portable Operations" All Work shall be performed in accordance with these regulations and are hereby made part of this Section by reference. Questions and information regarding these regulations should be addressed to Texas Commission on Environmental Quality P 0 Box 13087 Austin, Texas 78711-3087 (512) 908-1000 4 The Contractor shall contain all waste and process discharge in accordance with the accepted methods for the process and materials that are in abatement. 5 Air filtration/dust collectors shall be used m conjunction with the dehumidification and/or ventilation equipment during blasting operations. 6 Where abrasive blast cleaning will not remove or properly prepare metal surfaces, hand and/or power tool cleaning shall be used to remove such conditions as weld splatter, laminations and radius-sharp edges. Hand tool or power tool shall be used on areas less than 2 foot diameter or smaller or on corners and edges of the reservoir and its internal support members. 7 All abrasive blast equipment shall be equipped with, including but not limited to the following: a. Noise reducing devices. b. Hose coupling safety devices. c. Electrical grounding devices. d. Moisture traps and filters. e. Fresh air hoods for all blasters. f "Dead Man" switches on all blast hoses. g. Air Dryers. J The following methods are approved for the removal of lead based coatings. 1 Vacuum Blasting. 2 Shrouded Hydroblasting. 3 Shrouded Wet Abrasive Blasting. 4 Shrouded Dry Blasting. 5 Alternate Methods. Alternate removal methods shall have pnor wntten approval by the TCEQ Air Program prior to submittal to the Owner for consideration. K. Surface profile shall be in accordance with manufacturer's printed requirements. 03/2016 09950-27 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS L. The adequacy of the preparation of surfaces shall be determined by comparing the surface with SSPC VIS 1, SSPC VIS 3, SSPC VIS 4 and NACE RP0178 M. Perform lead-based paint removal work in accordance with 29 CFR 1926 62 and as specified. 3 03 APPLICATION A. After abrasive blast cleaning, dust and spent abrasive shall be removed from the surfaces by air blasting and brush sweeping. The prime coat shall be applied as soon as possible after the blasting and surface cleaning is completed, inspected and approved by the Inspector B Blasted surfaces shall be coated before rust forms on the surface. All blasted surfaces shall be coated to within 6 inches of the edge of a blasted area. No visible rust shall be coated under any circumstances, including rust bloom or if discoloration has occurred,regardless of elapsed time between blasting and coating. i C Provide mist coat as recommended by the Coating Manufacturer D The Contractor shall apply each coat at the rate and in the manner specified by the Coatmg Manufacturer, except as may be modified herein. If material has thickened or must be diluted for application, coating shall be built up to the same dry film thickness as specified for each coat of the complete system. E. Maximum and minimum DFT shall be per the supplied Coating Manufacturer's printed requirements and as required by this Section. F The Contractor and painting technicians shall be responsible application of coating system and shall have current applicator'certifications from the Coating Manufacturer Submit certifications with coating submittal. Manufacturer shall certify that coating system is compatible with the tank's cathodic protection system. G No coating shall be used which has an expired shelf or pot life. H. Coating shall be applied by skilled workmen and shall be brushed out or sprayed evenly,without runs, crazing, sags, or other blemishes. I. Sand between coats to remove over spray and dry fall. J Apply the first coat to the surface, including cutting m around edges,before the second coat is applied. The second coat and any successive coats shall not to be applied before notifying the Owner's field representative and obtaining approval. Each coat shall be tested before the successive coat is applied. K. The coating cunng penod shall be adjusted to compensate for less than adequate weather conditions, as recommended by the Coating Manufacturer, for complete curing of the entire coating system. The full drying time recommended by the manufacturer shall be allowed. L. Coating shall be continuous and shall be accomplished in an orderly manner to facilitate proper inspection control. 03/2016 09950-28 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS M. Where a roller or brush is used to apply the coating, additional coats may be necessary to achieve the recommended dry film thickness and/or to achieve total coverage of the underlying surface. Coated surfaces shall be totally free of all roller nap, roller marks,brush bristles and brush marks. N When using conventional coating spray equipment for coating operations, effective oil and water separators combined with after coolers or deliquescent dryers shall be used in compressed air lines to remove detrimental oil and moisture from the air Separators shall be placed as far as practical from the compressor Compressors may be tested periodically by the Owner's representative for oil and water contamination of compressed air Testing shall follow ASTM D4285 "Standard Test Method of Indicating Oil and Water in Compressed Air" All compressor units found to produce unacceptable amounts of oil and or water, as determined by results of ASTM D4285 test data and interpretation of data by the Owner's representative shall be replaced with a compressor that is acceptable. 0 To the extent possible, the mterior and exterior of all piping entering through the walls of the reservoir tank shall be blasted and recoated the same as their respective reservoir walls. The interior of pipmg entering through the reservoir floor shall be blasted and recoated the same as the interior of the reservoir Methods of recovering blast material from the mside of the pipes shall be submitted and approved by the Owner P Protect adjacent materials from damage, including over spray or spillage. Provide drop cloths or other protective tarps to cover floors, equipment or other adjacent materials. Q Tank Floor Flange Sealant 1 Round Backer Rod a. Place appropriate size backer rod(compressed apx. 25%)in the opening between the tank bottom and the concrete base in such a manner that the backer rod protrudes out of the opening approximately'/2 depth of the width of opemng. 2. Sealant System a. Apply prime coat of Polyspec 5050 Primer or approved equal at 2.0-3 0 mils DFT recommendations as listed on data sheet. Coat with Polyspec 2235M or approved equal and or Polyspec 2282 Sealant or approved equal at minimum 2 hrs maximum 36 hrs at 77F b. Apply Polyspec 2235M or approved equal, into gap, and form small 3"radius cove against tank shell,hand tool smooth. c. Apply finish coat of Polyspec 2282 Sealant or approved equal at 60-100 mils DFT per manufacturer's recommendations as listed on data sheet. Fimsh coat of Polyspec 2282 or approved equal can be applied at minimum of 2.5 hours after application of Polyspec 2235M or approved equal, at 77F,no max recoat, surface needs to be cleaned/light sanded if extended period prior to applying Polyspec 2282 or approved equal. 03/2016 09950-29 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS 3 04 STRIPE COAT A. Stipe coat shall be applied by brush and thinned according to written Coating Manufacturer's recommendations and applied to all welds,weld seams,tack welds (new and old), edges,bolts,rivets, ladder rails and rungs, seamed corners,joints of any kind and locations where brackets, lugs and other difficult to coat surfaces exist. Stripe coat on all welds and weld seams shall extend 2 inches minimum above,below and beyond all welded sections. B Stripe coat shall occur in coating system layering as stated in Coating Schedule. C Stripe coat is accomplished by moving the brush back and forth in a scrubbing motion working primer into all crevices. Stripe coat shall be performed with a high quality bristle brush using primer that has been thinned according to manufacturer's instructions. Bristles left on the surface shall be removed before the coating dries. If bristles are discovered after the coating has dried, the bristle shall be removed, the coating removed, and the area correctly re-coated at no additional cost to the Owner D Stripe coating shall be tinted such that it can be easily distinguished from the other coats. 3 05 FINISH A. All primer, intermediate and finish coats shall be inspected visually and shall be free of all sags,runs,bubbles, drips,waves, laps,unnecessary brush marks, over spray, environmental contaminants or other physical defects, mcludmg shadows, and be uniform in color, texture and gloss. All coatings shall be applied in a professional manner to achieve the specified dry film thickness (DFT) leaving a smooth and uniform coating. Sand between coats to remove over spray and dry fall. B Finish coat shall have a uniform color and texture. Any"bleed through"will not be accepted and Contractor shall provide additional coatings as required to provide a uniform color 3 06 PROTECTION OF EXISTING STRUCTURES A. The Contractor shall take every precaution available while cleaning and coatmg the reservoir and pedestal to avoid dusting or spraying the reservoir property,nearby residences and vehicles with either blast debris or over-spray coating. Shrouding is mandatory for exterior abrasive blasting and for spray application of coatings. All shrouding, containment and disposal of waste will be in conformance with TCEQ Requirements. The Contractor shall be responsible for properly loading, securing, transporting and disposing of all waste. B If, in the opimon of the Owner's representative, modifications or repairs are necessary to the shroud or ground cover apparatus to provide improved containment of blasting or coating operations,blasting and coating operations shall stop until the Owner's representative indicates to the Contractor that adequate repairs are complete. C Prior to any surface preparation,the ground surrounding the reservoir and pedestal shall be covered with tarps or a similar ground cover that will allow for recovery of 03/2016 09950-30 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS paint scraps and blast media. Adequate protection of all areas surrounding the tank shall be provided during coating application. D The Contractor is responsible for complete cleanup of any and all areas contaminated by blast debris. E. The Contractor is responsible for any and all damages to on-site facilities,residences, vehicles and/or public health, including any fines or penalties resulting from improper containment during blasting or coating of the reservoir and pedestal. F If present at the Site, all secunty equipment(light poles, camera poles,microwave beam poles, etc.) shall be protected by construction of temporary fences or barricades around above ground devices (4 feet shall remain clear of construction materials and activities around all secunty equipment devices). 3 07 CLEAN AND ADJUST A. Promptly remove trash and debris resulting from painting operation from the Site. Remove drop cloths,masking tapes and other protective coverings. Remove paint spills, splatters, overlap of paint from adjacent material and other defects. Spot paint nicks and other defects. B Remove paint containers and waste products. Thoroughly clean paint storage rooms, removing spilled paint from walls and floors. 3 08 ANNIVERSARY INSPECTION A. The Contractor shall observe all surfaces of the reservoir with the Owner within 12 months after the reservoir work has been,accepted for Substantial Completion and placed in service. If an observation date has not been established within 12 months after the reservoir has been placed in service, the anniversary observation shall be considered waved, except in the event the Owner is unable to remove the reservoir from service due to extremely long dry climate conditions or otherwise adverse weather conditions or due to unexpected breakdowns in the distribution system. The date of anniversary observation may be extended for a penod of time not to exceed 12 months beyond the date of Final Completion and acceptance of the work. B If failures in any portion of the reservoir surface, exceeds 5 percent of that portion, as determined by the Owner,then for that portion,the entire coating system shall be completely removed, re-coated and re-tested in accordance with the specifications herein. In the event any portion of the reservoir surface requires repair,partial or complete, a second anniversary observation shall be made unless the Owner otherwise deems it not to be necessary If subsequent anniversary observations are made,time stipulations, coating removal,repair; re-testing requirements shall be the same as provided for in this Specification. Each subsequent repair will have a warranty observation to occur withm 12 months after the repair is completed. C. The Owner will isolate the reservoir from the distribution system and drain the reservoir The Contractor shall open, clean out,high-pressure water wash and rinse the tank prior to the anniversary observation. After observation of the tank is complete and repair work accepted by Owner,the Contractor shall follow disinfection 03/2016 09950-31 of 32 CITY OF PEARLAND COATINGS FOR WATER STORAGE TANKS procedures specified. Disinfection of the tank, after anniversary observation, shall be by Owner as described above should Contractor meet cleanliness requirements. D The Contractor shall provide suitable and adequate equipment including, lighting, ventilation,rigging, cable climbers, mirrors, inspection equipment, and sufficient man-power to clean, disinfect and move equipment and tools around the reservoir, etc., as may be necessary to facilitate complete observation of all interior surfaces. The Contractor shall bear all costs of the anniversary observation and shall incorporate such costs into his bid. E. Any location, including but not limited to locations where a coating has peeled off, bubbled,blistered, chipped, or cracked, etc., or where pinholes and/or holidays are present and locations where rusting or corrosion is evident,will be considered a failure or defect of the coating system and shall be repaired as required. Repairs will be made at areas or locations where coating failures are found, even though metal surfaces may be protected a cathodic protection system. F Methods of testing for coating failure which, may or may not be evident, shall include,but not be limited to, adhesion tests, film thickness measurement,holiday testing, etc Testing may be non-destructive or destructive. The Contractor, at his expense, shall repair all areas where destructive tests are performed. G The anniversary repair work shall be completed within an agreed time period as determined by the Owner and Contractor All repairs shall be made as per the Coating Manufacturer's written repair work instructions or that which is approved and acceptable to the Owner and completed within 90 calendar days of the anniversary observation. Holiday testing will be used to check all reservoir interior coating repairs, including the interior roof. END OF SECTION 03/2016 09950-32 of 32 CITY OF PEARLAND STEEL WATER TANK REPAIR SECTION 13409 STEEL WATER TANK REPAIR 1.00 GENERAL 1 01 WORK INCLUDED A. Provide labor,matenals, equipment and incidentals necessary to perform the repair or replacement of pits, holes and corrosion damage to the skin and structural elements of the water storage tank. Provide structural steel shapes, columns,base plates, fabncated components and bolts, washers, nuts,rivets or other fasteners necessary to complete the Work. B. Provide the labor and equipment for the delivery and repair or erection of structural steel components to the job site, including the temporary bracing, guying, supports, etc.,that may be necessary during erection. Comply with governmental safety standards in erecting steel components. 102 SUBMITTALS A. Shop Drawings of all fabncated and new items shall be submitted for review in accordance with Section 01300"Submittal Procedures." B. Construction drawings of all fabncated and new items shall be submitted to the Engineer for review Drawings submitted shall at a minimum include the following: 1 Drawings of proposed permanent,temporary and/or modifications to existing manholes,hatches,vents, ladders,platforms,pipe penetrations and other steel products. C Submit certification mill reports of steel type, strength and mill analysis. D Epoxy Filler and Surfacer 1 Manufacturer's product data. 2. MSDS 3 Approval of application by tank coatings manufacturer E. Foundation Repair and Sealants. 1 Manufacturer's product data. 2 MSDS. F Cable Safety Climb System. 1 Manufacturer's product data sheets. 2. Matenal list of products to be installed on project. 3 O&M Data for product. 4 Manufacturer's product data sheet for fall protection signage. 03/2016 13409- 1 of 14 CITY OF PEARLAND STEEL WATER TANK REPAIR G Ladder Safety Post: 1 Manufacturer's product data sheets. 2 Material list of products to be installed on project. 3 O&M Data for product. H. Roof Hatch. 1 Manufacturer's product data sheets. 2. Material list of products to be installed on project. 3 O&M Data for product. I. Tank Vent: 1 Manufacturer's calculations and certifications for vent. 2. Manufacturer's product data sheets. 3 Material list of products to be installed on project. 4 O&M Data for product. J Exterior Tank Level Indicator 1 Manufacturer's product data sheets. 2. Material list of products to be installed on project. 3 O&M Data for product. K. Provide a Certified Test Report certifying the Work was constructed and mspected m accordance with Section 11.2.1 of AWWA D100 L. Submit documentation of conformance to AWS requirements of all weldmg and fabrication procedures prior to the start of construction. M. Provide documentation of location and frequency of all weld testing in accordance with D100 N Submit Welder Qualification Certificates. 0 Submit lengths of existing electrodes for record. 103 STANDARDS A. Applicable provisions of the current editions of the following codes are incorporated in this specification and govern the Work. 1 American Institute of Steel Construction(AISC) a. AISC Code of Standard Practice for Steel Buildings and Bridges (except Section 4.2.1 is excluded in its entirety). b. AISC Specifications for the Design,Fabrication and Erection of Structural Steel for Buildings. c. AISC Manual of Steel Construction. 03/2016 13409-2 of 14 CITY OF PEARLAND STEEL WATER TANK REPAIR 2 American Petroleum Institute (API) Standard 650 Welded Tanks for Oil Storage Standard 653 Tank Inspection,Repair, and Reconstruction 3 ASTM International (ASTM) ASTM A6 Standard Specification for General Requirements for Rolled Structural Steel Bars,Plates, Shapes, and,Sheet Piling ASTM A36 Standard Specification for Carbon Structural Steel ASTM A53 Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated,Welded and Seamless ASTM Standard Specification for Zinc (Hot-Dip Galvanized) Coatings A123 on Iron and Steel Products ASTM Standard Specification for Zinc Coating(Hot-Dip) on Iron and A153 Steel Hardware ASTM Standard Specification for Carbon Steel Bolts, Studs, and A307 Threaded Rod 60000 PSI Tensile Strength ASTM Standard Specification for Structural Bolts, Steel,Heat Treated, A325 120/105 ksi Minimum Tensile Strength 4 American Weldmg Society(AWS) AWS Structural Welding Code Steel D1 1 5. American Water Works Association(AWWA) AWWA Steel Water Pipe 6 Inch(150 Mm) and Larger C200 AWWA Welded Steel Tanks.for Water Storage D 100 6. National Association of Corrosion Engineers (NACE International) NACE Fabncation Details, Surface Finish Requirements, and Proper SP0178 Design Considerations for Tanks and Vessels to be Lined for Immersion Service NACE Plastic Weld Comparator RP0178 7 Occupational Safety and Health Administration(OSHA) Standard Guarding Floor and Wall Openings and Holes 1910.23 Standard Fixed Ladders 1910.27 03/2016 13409-3 of 14 CITY OF PEARLAND STEEL WATER TANK REPAIR 8. Regents Council on Structural Connections of the Engmeermg Foundation (RCSC) a. RCSC Specifications for Structural Joints Using ASTM A325 or ASTM A490 9 Texas Commission on Environmental Quality(TCEQ)/Texas Administration Code (TAC). a. 30 TAC Chapter 111, Subchapter A, Division 3,Abrasive Blasting of Water Storage Tanks Performed by Portable Operations. b. 30 TAC Chapter 290, Subchapter D, Rules and Regulations for Public Water Systems. c. 30 TAC Chapter 290, Subchapter 290 13,Water Storage. 1 04 QUALITY ASSURANCE A. Inspection and testing of materials and welds shall be as required by AWWA D100, Section II and Appendix C, except where specified otherwise. B. Contractor shall furnish welders that are qualified and certified, complying with all sections of AWWA D100 C Contractor shall have knowledge and experience with the painting and rehabilitation of potable water storage tanks. D Contractor shall have working knowledge of the Standards of AWWA,API 650,API 653,NACE, SSPC, and compliance with the requirements of the Texas Commission for Environmental Quality(TCEQ) and other regulatory agencies for potable water supply systems. 1 05 DELIVERY AND STORAGE A. Deliver steel members to the Site and raise into proper position and secure in place. Store steel on site on heavy timber runners. Maintain a clearance between steel and ground. 1 06 JOB CONDITIONS A. Determine actual dimensions of the structure for fabrication of repair or replacement members. B If the Contractor uses any existing ladders or tie-offs for any of the rehabilitation operations, Contractor shall verify the condition of the existing ladders and venfy they comply with its internal safety requirements and any OSHA or other regulations related to the use of ladders and tie-offs for construction. The Owner and Engineer assume no responsibility for working condition of the ladders or tie-offs nor for the safety of Contractor's employees. Existing ladder rungs shall not be used for equipment rigging or any other support purpose. 03/2016 13409-4 of 14 CITY OF PEARLAND STEEL WATER TANK REPAIR C. Any necessary temporary protective devices for compliance with Federal OSHA requirements, all state and local safety regulations, and safe working practices shall be furnished and maintained by the Contractor D Contractor shall take all precautions during demolition of any part of the tank and appurtenances to minimize chipping or flaking of any paint. Any particles which are removed from the tank surfaces, accidentally or otherwise, shall be properly recovered, contained, and removed from the Site. 2.00 PRODUCTS 2.01 MATERIALS A. Structural Steel. Provide structural shapes,plates, and bars conforming to Standard Specification ASTM A6, latest edition. Steel is to be ASTM Designation A36 with a yield strength of 36,000 psi. B Steel pipe shall be conform to AWWA C200 C Unfinished Bolts and Nuts. Provide regular hexagon bolt type unfinished bolts and nuts conforming to ASTM Standard A307 D Turned Bolts and Nuts. Provide bolts and nuts conforming to ASTM A307 E. High Strength Bolts and Nuts. Provide high strength bolts and nuts conforming to ASTM Specification A325 with bolt and nut dimensions and threads conforming to American Standard B 18.22 for regular semi-finished hexagon bolts and heavy semi- finished hexagon nuts. F Washers. Provide round washers conforming to American Standard B27.2, Type B Use washers in contact with high strength bolt heads and nuts hardened in accordance with ASTM Standard A325 Use beveled washers that are square, smooth, and sloped so that contact surfaces of bolt head and nut are parallel. Provide holes with a diameter 1/16 inch greater than the bolt size for bolts not larger than 1 inch, and 1/8 inch greater than the bolt size for bolts larger than 1 inch. G Calibrated Washers. Install A325 bolts using Bethlehem"Load Indicator Washers" in accordance with the Manufacturer's recommendations and RCSC Specifications. H. Filler Metal for Welding: Provide welding electrodes for manual schedules metal arc welding conforming to AWS Specifications. Use bare electrodes and granular flux for submerged arc process conforming to Section 1 4.5 of AISC "Specifications for the Design,Fabrication and Erection of Structural Steel for Buildings" Use only E70 Series electrodes for manual arc welding and electrodes conforming to AWS A5 17 80 for submerged arc process for welding A36 steel. I. Epoxy Filler and Surfacer shall be 100 percent solids epoxy filler and surface for steel. Product shall be NSF/ANSI Standard 61 certified for contact with potable water Approved manufacturers. 1 Tnemec - Senes 215 Surfacing Epoxy 2. As Approved by the Coatings Manufacturer and the Engineer 03/2016 13409-5 of 14 CITY OF PEARLAND STEEL WATER TANK REPAIR J Foundation Repair shall be an epoxy cementitious aggregate reinforced material for surfacing,patching and filling voids and bugholes in concrete substrates. Approved manufacturers. 1 Tnemec—Senes 218 Mortarclad. 2. EpoCem—Sikagard 75 K. Baseplate and Foundation Sealant: 1 Sika Corporation—Sikaflex 1A—For joints up to 1 inch deep. 2. Sika Corporation—Sikaflex 2C—For joints greater than 1 mch deep. 3 Backer Rod—Industrial Thermo Polymers—ITP Standard Closed Cell Polyethylene Foam. L. Roof Hatches. 1 Hatch shall be single leaf and constructed of aluminum with 316 stainless steel hardware. Hatch shall be rated for a minimum live load of 150 psf. 2. The access door shall be equipped with a 316 stainless steel slamlock with fixed exterior and interior handles and mtenor and extenor padlock staples. The door shall have stainless steel gas shocks to assist in opening the door and reducing the force during closing. A 316 stainless steel hold open arm with push/pull handle shall automatically keep the cover in its upright, open position. 3 Hatch shall be installed on a minimum 4-mch concrete curb Hatch lid shall have a minimum 2-inch overhang as required by TCEQ Chapter 290 Provide a neoprene gasket between concrete curb and hatch. 4 An EPDM rubber gasket shall be used to make a positive seal when the hatch is closed. 5 Aluminum shall have a clear anodic finish. AAMA 611,AA-M12C22A41, Class I, 0 018 mm or thicker 6 Installation shall be in accordance with the manufacturer's written instructions. 7 Manufacturer shall guarantee hatch against defects in materials and workmanship for a minimum of 10 years. 8 Approved Manufacturers. a Babcock-Davis. b. Bilco Company c. Milcor, Inc. d U.S.F Fabrication. e Approved Equal. 9 Provide confined space label on roof hatches, Seton Item No 5185C or approved equal. 03/2016 13409-6 of 14 CITY OF PEARLAND STEEL WATER TANK REPAIR M. Tank Center Vent: 1 Acceptable Manufacturers. a. AST model roof vent by Advance Tank and Construction. b. Approved Equal. 2. Hardware utilized m the tank vent shall be of 316 stamless steel. 3 The vent cap shall be designed with a vertical overhang to prevent the entrance of wmd driven ram and debns. 4 Vent shall be screened with#16 316 stainless steel insect screen. 5 Vent shall be equipped with vacuum and pressure relief mechanism as required by AWWA D 100 6 The center vent diameter shall be as indicated on the Drawings. 7 The open area of the vent screen shall be at least equal to the vent diameter 2.02 FABRICATIONS A. General. 1 Provide structural members consisting of a single rolled shape that are straight within AISC tolerances. Do not deviate from straightness by more than 1/1000 of the axial length between pomts for compression members which are to be laterally supported. 2. A variation of 1/32 inch is permissible m the overall length of members with both ends milled. Members without milled ends which are to be framed to other steel parts of the structure may have a variation from the detailed length not greater than 1/16 mch for members 30 feet or less in length and not greater than 1/8 inch for members over 30 feet in length. 3 Thermal cutting by machine is permissible provided the metal cut is not carrying stresses during the operation. Thermally cut edges which will be subjected to substantial stress or which have weld metal deposited on them must be free from gouges or notches,remove any gouges that remain from cutting by grmding. To determine the effective width of members deduct 1/8 mch from each thermal cut edge to determine the effective width of members. The radius of re-entrant thermally cut fillets shall be as large as practicable,but not less than 1 inch. 4 Planing or finishing of sheared or thermally cut edges of plates or shapes will not be required unless specifically called for Mill all edges to be fitted to other members by welding, such as columns at bearing plate. Machine beanng faces to a common plane at compression joints dependmg upon contact bearing. Cut the remaining joints straight. Mill columns and stiffeners to give full beanng over the cross-section. 5 Provide the necessary steel bearing plates for reactions of beams and columns, and connection stiffeners and gussets whether specifically shown on the Drawings or not. 03/2016 13409-7 of 14 CITY OF PEARLAND STEEL WATER TANK REPAIR 6 Fabrications and modifications to the tank shall be m accordance with AWWA D100,API 650 and API 653 with the most stringent requirement being applied. B Bolted Construction. 1 Provide holes for bolts 1/16 inch larger than the nominal diameter of the bolt. Holes may be punched if the thickness of the material is not greater than the nominal diameter of the bolt plus 1/8 mch. Drill holes from the solid or sub punched and ream if the thickness of the material is greater than the nominal diameter of the bolt plus 1/8 mch. 2 Ream holes that must be enlarged to admit bolts. Poorly matching holes will be rejected. 3 Remove dirt, loose scale,burrs, and other defects that would prevent solid seating of the parts pnor to assembly Remove oil,paint, lacquer or galvanizing from contact surfaces within friction type joints. 4 Tighten ASTM A325 bolts to a bolt tension not less than the proof load given m the applicable ASTM Specifications for the type of bolt used. Perform tightening by use of approved calibrated washers such as Bethlehem"Load Indicator Washer" C. Welded Construction. 1 Conform to Section 4, "Technique"of the Current Edition of the"Structural Welding Code Steel"by the American Welding Society for the technique of welding employed, the appearance and quality of welds made, and methods used m correcting defective Work. 2. Remove loose scale, slag,rust, grease,paint, and any other foreign matenal except mill scale withstanding vigorous wire brushing from surfaces to be welded. Remove fins and tears from joint surfaces. Perform gas cutting by mechanically guided torch. 3 Welders and welding operators must have been previously qualified by tests as prescribed in the American Welding Society's "Structural Welding Code Steel"to perform the type of work required. 4 Provide a 1-1/4-by-3/16-inch backup plate on beam flanges employing full penetration welds. Back gouge root pass and weld flush on backside of beam webs where full penetration is specified. 5 Clean tack welds and thoroughly fuse with fmal weld. Remove defective, cracked, or broken tack welds before final welding. Tack welds must be removed from joints where stress is primary if welding is to be manual. 6 Mark welder identification with paint or stamp near the welds constructed so weldments can be properly identified and associated with the correct welder 7 Provide sound weld metal free of cracks in any weld or weld pass. Fill all craters to the full cross-section of the welds. Remove weld scale or slag, spatter,burrs, and other sharp or rough projections to leave the surface suitable for non- destructive testing, cleaning, and painting. 03/2016 13409-8 of 14 CITY OF PEARLAND STEEL WATER TANK REPAIR 8 Take corrective measures when welding is unsatisfactory or indicates inferior workmanship. Chip and grind if the removal of part of the weld"or a portion of the base metal is required. The shape sides of the area to be welded to have no less than 1 1 slope to allow room for depositmg new matenal where deposition where deposition of additional weld material is necessary Correct defective or unsound welds by the removal and replacement of the entire weld using the followmg procedures a. Excessive Convexity Reduce to size by removal of excess weld metal by grinding. b. Shrinkage Cracks, Cracks in Base Metal, Craters and Excessive Porosity Remove defective portions of base and weld matenal down to sound metal, and deposit additional sound matenal. c. Undercutting,Undersize, and Excessive Concavity Clean and deposit additional weld metal. d. Overlapping and Incomplete Fusion. Remove and replace the defective portion of the weld. e. Slag Inclusion. Remove those parts of the welds contammg slag. Fill with sound weld metal. f Removal of Adjacent Base Metal during Welding: Clean and form full size by depositing weld material. 9 Remove cracked welds throughout their length. 10 Where work performed subsequently to the making of the deficient weld has rendered the weld inaccessible, or has caused new conditions which make connection of the deficiency dangerous or ineffectual,restore the original conditions by removing welds or members or both before making the necessary corrections. 11 Cut apart and reweld improperly fitted and misaligned parts. 12. Straighten members distorted by heat of welding using mechanical means or by carefully supervised application of a limited amount of localized heat. Heated areas shall not exceed 1200 F as measured by Tempilsticks. Parts to be heated for straightening shall be free from external stress forces, except when mechanical means are used in conjunction with heat application. 13 Remove and replace the damaged matenal and compensate for the deficiency in a manner acceptable to the Engineer If faulty welding or its removal for rewelding damages the base metal so that, m the Engineer's judgment, it is not in accordance with the intent of the drawings and specifications. 03/2016 13409-9 of 14 CITY OF PEARLAND STEEL WATER TANK REPAIR 3.00 EXECUTION 3 01 PREPARATION A. Shop pamtmg shall be as specified m Section 09950 "Coatings for Water Storage Tanks." B Protect machine finished surfaces against corrosion by an approved coating. 3 02 ERECTION OF STEEL A. Erect steel in accordance with the Standard Specifications of the Amencan Institute for Steel Construction usmg workmen experienced in this form of work. B. The framing shall be carried up true and plumb and temporary bracmg shall be introduced wherever necessary to take care of the loads to which the structure may be subjected, including erection equipment and its operation. Leave bracing in place as long as required for safety Securely connect work to take care of all dead load,wind, and erection stresses during erection. 3 03 BOLTED FIELD CONNECTION A. Use high strength bolts havmg a suitable identifying mark on top of the head for field connections. B Use load indicator washers to judge the tightening of nuts. Use the minimum bolt tension for the size of bolt shown in tables listed in the referenced standards. 3 04 WELDED FIELD CONNECTION A. Welders must have previously qualified by tests, as prescribed by the "Standard Qualifications Procedure"in the"Structural Welding Code Steel"by the American Welding Society to perform the type of work required. Provide certification that welders have passed qualification test within 6 months just prior to performance of the Work. Welding must be approved. B Weld profiles shall conform to NACE RP0178, Profile `D' 3 05 TEMPLATES A. Furnish templates as indicated. Furnish instructions for the setting of anchors, connection details, and bearing plates and ascertain that the items are properly set during the progressiof the Work. 3 06 FIELD CORROSION REPAIRS A. Repair pits and damage to plates. 1 Clean the surface to determine the extent of corrosion damage as determined by the Engineer 03/2016 13409- 10 of 14 CITY OF PEARLAND STEEL WATER TANK REPAIR 2. Repair pits 1/16 or one-fourth of the plate thickness at its deepest point and no greater than 1/2 mch m diameter at the bottom of the pit by cleanmg the area and filling the pit with seam sealer in accordance with the details. 3 Repair pits deeper than three-fourths of the plate thickness and/or a bottom diameter greater than 1/2 inch in accordance with the details following this Section. 4 Repair holes per details shown in accordance with details following this Section. 5 Install patch or replacement plates m accordance with the details shown m following this Section. B. Repair or replace damaged structural rolled shapes and bars. 1 Remove linear segments of rolled shapes that have 15 percent or more of the cross-sectional area missing after cleaning. Remove the segment to a point with a solid cross-section. The replacement segment must have a cross-section equal to or greater than the section that is removed. The replacement section is to be lap welded with laps that allow the weld to develop strength equal to that of the repaired member Seams between the replacement section and the ongmal member that are not sealed by weldmg are to be sealed with epoxy seal sealer 2. Members that have 15 percent or more of the cross-sectional area missing and extend more than 25 percent of the members' length are to be replaced. The replacement member is to be equal to or greater than the ongmal member and of the same rolled shape. Attach the replacement member so that the new member will develop-the same load carrying capacity as the onginal. Seams between the replacement section and the original member that are not sealed by welding are to be sealed with epoxy seal sealer 3 07 TANK ACCESS A. Existing manways may be used for access to the interior of the tank. B If the Contractor desires to cut temporary openmg through the permanent structure for equipment and personnel access,the Contractor shall submit the following information to the Owner and Engineer for review pnor to cutting or welding on the shell. If submittal is reviewed and approved by the Owner and Engineer,the Contractor shall remove and replace the shell plate in accordance with the American Petroleum Institute(API) Standard 653,API Standard 650, and AWWA D100 with the most stringent requirements applied. All required temporary stiffening shall be installed by the Contractor pnor to cutting the temporary shell opening. The temporary stiffening shall be removed by the Contractor pnor to cutting the shell opening. The temporary stiffening shall be removed by the Contractor after the door sheet is welded back into place and repair any surface imperfections prior to abrasive blasting and coating those areas of the tank surfaces. The Contractor shall submit the following information for the review and approval of the Owner and Engineer 1 Weld qualification procedures. 2. Welder certifications and credentials. 03/2016 13409-11 of 14 CITY OF PEARLAND STEEL WATER TANK REPAIR 3 A detailed drawing from showing the size and configuration of the proposed opening, mcluding details at intersections with the existing weld seams, corners of the opening, and cut back of corner welds or girth seams. 4 Details of the location of the proposed opening relative to existing shell opening, or penetrations,weld seams,or other attachments to the shell, such as anchor bolt chairs or other base plate attachments. 5 A detail drawmg of the proposed temporary stiffening along each side across the top of the opening, including weld details. 6 The proposed method and sequence for cutting the opening in the shell and making cut back. The corner weld between the shell and the bottom shall be gouged on each side at least 12 inches beyond the openmg. 7 Details of the weld jomt penetration for the shell and the door sheet, mcluding process for grmding and beveling. 8 Descnption of weld procedures of all joints and attachment welds, including any preheating or any post weld heat treating requirements,rod size, etc. 9 Descnption of weld sequence for remstallmg the door sheet. 10 Details of the proposed non-destructive examination(NDE)plan with the number and location of x-rays. Note- a minimum of four x-rays will be required with one at a horizontal weld seam, one at a vertical weld seam, and the others located at the honzontal/vertical weld seam junctions. 11 All detail drawmgs shall be signed and sealed by a licensed professional engineer registered in the State of Texas. 3 08 TANK REPAIRS AND ADDITIONS A. Tank Repairs. 1 Interior Gnnding: Any irregular surfaces identified by the Contractor and authorized by the Field Inspector, including but not limited to surface protrusions, burrs, fitting scars,weld splatter, corners, sharp edges,rough weld beads, and weld overlap shall be removed from all intenor surfaces of the tank. The grinding is intended to eliminate irregular surfaces and to provide an adequately smooth surface for the application of the specified protective coating. 2. Seam Welding: All areas of apparent seam detenoration shall be abrasive blast cleaned, and any seam corrosion or undercutting identified by the Contractor and authorized by the Field Inspector shall be repaired by arc gouging and seal welding. 3 Pit Welding: All areas of apparent pitting shall be abrasive blast cleaned, and any pits identified for pit welding by the Contractor and authonzed by the Field Inspector shall be repaired by welding. 4 Pit Filling: All areas of apparent pitting shall be abrasive blast cleaned, and any pits or seams identified for pit filling by the Contractor and authorized by the Field Inspector shall be filled with solventless polyamide epoxy seam sealer of the 03/2016 13409- 12 of 14 CITY OF PEARLAND' STEEL WATER TANK REPAIR type recommended by the manufacturer of the interior coating system. Any rough areas of the seam sealer shall be sanded smooth prior to the application of the coatmg system. 5 Apply sealer to all unwelded roof laps and at seams at no additional cost. B Additions and Modifications. 1 Ladders. a. Install proposed ladders with appurtenances as mdicated below. Ladder Fall ,. .w Location MaterialSafety Prevention. ,Cage. Post System Required . .. . ...,... .... . ... . . . . ....: .. ,... Required: ; Required.... �:, ... Proposed Extenor Galvanized Shell (Ground to X X Steel Roof) b. All ladders shall be constructed and installed per OSHA standards. c. The fall prevention system shall be installed m accordance with manufacturer's mstallation instructions by a competent person. d. Fall prevention systems shall not be installed until all painting operations are completed. e. Install insulators at connections between dissimilar metals: For connections on the interior of the tank, insulators shall be NSF 61 approved. f Exterior Ladder Access. 1) The exterior ladder shall have a lockable gate at the bottom of the ladder cage. The gate shall be equipped with a locking hasp and padlock keyed to match Owner's locks. Gate shall encroach on OSHA required ladder clearances in the open position. Ladder shall have a mechanism to hold the gate open while operators are accessing the ladder Gate shall not open downwards towards the climber All hardware and components shall be 316 stainless steel. Ladder gate design and connection to the tank shall be per the tank manufacturer and approved by the Engmeer 2. Roof Vent: Vent shall be installed to conform to the dimensions and installation details shown on the Drawings. 3 Handrails. a. Install proposed handrails with appurtenances as indicated below- Location M Material Tank Roof at Interior and Exterior Schedule 40 Anodized Ladders Aluminum Pipe 03/2016 13409- 13 of 14 CITY OF PEARLAND STEEL WATER TANK REPAIR 3 09 FOUNDATION REPAIRS A. Router cracks in the foundation to be a U-shape, 3/4-inch wide x 1-mch deep Remove all loose dirt and debris from the area by low pressure water blasting. B Apply product cleaner and prepare surface per the manufacturer's wntten requirements. C Mix and apply product per the manufacturer's wntten directions. 3 10 BASEPLATE AND FOUNDATION SEALANT REPAIR A. Remove all loose sealant, grout and foreign matenal between the baseplate and the foundation by hand tools and low pressure water blasting. B. Where new concrete or grout is to be placed m contact with existmg hardened concrete,texture the existmg surface by chipping or other means so that an irregular surface havmg a height variance of not less than 1/4 inch is created. The existing concrete shall then be coated with a bonding agent and new concrete or grout placed. C Place non-shrinking, high strength structural grout between the tank bottom plate and the concrete foundation. D Apply sealant into remaining gaps exceeding 1/32 inch per the manufacturer's wntten direction. E. Refer to Section 03305 "Miscellaneous Cast-in-Place Concrete" for material and application procedures. 3 11 CLEAN AND ADJUST A. After inspection and approval, and before leaving the coating,the steel work shall be thoroughly cleaned of loose scale,rust, splatter, slag, flux, deposit, oil, dirt, and other , foreign matter END OF SECTION 03/2016 13409-14 of 14 PROJECT DETAILS a 4xttr Sol,,..1.1P'0..V P J. 5. :yy y SDWtaSamtiaA aEHanTob.,oy fast ._ ,. � t z"*he �115 }rvswN L.2 q , S r6 3 } 4i P d4 €` /✓. t kt: - { *,0,D ko.0 KHa tPaI i s 4 Ldkc<of k (aft' Suburban Garden Rd Ground Storage Tank 13711 Suburban Garden Road t...,r «moo. IN Pearland, TX 77581 $ s A Pearland = 1; t„ y westgin.d.av Stre, A Liberty Dr Ground Storage Tank . . 3503 Liberty Drive 1 Pearland, TX 77581 a y : f 3. 4 . .<.etM.Y ,a,N, t 1 t x1 1 t 1 C7a M1�'r'' ul'+, Y Tx If. 1 u �i x 1 t 1 i t If 1 Ott• 4x S ��`y 713p I. N %9 W+E 0 2,000 4,000 8,000 s Feet ,.../PLI1.,,,LL„110P1a,113/ r,I v,‘ FREESE CITY OF PEARLAND FN De NO PRL16146 FILE f1 ?NICHOLS REHAB. GROUND STORAGE TANKS DATE Location Map mxd 11200 Broadway Street SCALE osioans Offices West,Suite 2332 CIVIL 1:4,000 B Pearland,TX 77584 LOCATION MAP DESIGNED FM ' FIGURE Phone-(832)456-4700 DRAFTED JMB WI 4 * , *: EXISTING PUMP STATION ; SANDBLAST ALL RUST AND ABRADED AREAS OF THE TANK INTERIOR TO AN SSPC #101 ovii014 . - (NEAR WHITE BLAST) CONDITION, BRUSH 7 BLAST ALL REMAINING AREAS, STRIPE COAT ***'" er• ALL SEAMS AND WELDS, THEN APPLY COATING `° /joi 1 PER SPECIFICATION 09950 I' \ EXISTING 550,000 GALLON I WELDED STEEL TANK, APPROX. / / , = 56' DIAMETER, 32' SIDEWALL . ,,. HEIGHT °' •;*!":'' - ,. ,':i-"-:.•:.1: ii - ''''' Ifiti:': ''... 0 WELD HANDRAILS AROUND ' INSTALL VENT WITH THREE SIDES OF THE ROOF VACUUM RELIEF FEATURE '5:7$'' HATCH PER HANDRAIL \ i�l PER VACUUM VENT ON # DETAILS ON FIGURE 5 ;� ,w FIGURE 6 s. 1 REMOVE EXISTING SAF—T . t CLIMB AND INSTALL ! • LADDER AND CAGE , PER LADDER DETAILS ON FIGURE 4 \ , i. REMOVE DAMAGE GROUT GRADE AROUND EXTERIOR OF TANK AND APPLY SEALANT WITH FOUNDATION TO EXPOSE A MINIMUM BACKER ROD PER OF 3" OF CONCRETE FOUNDATION. SPECIFICATION 09950 SPREAD EXCESS DIRT ON—SITE TO FILL LOW AREAS MAINTAIN POSITIVE DRAINAGE AT ALL TIMES. HYDROMULCH 3co SEED ALL DISTURBED AREAS. 0 0 w �m I � N E.' i 0 50' 100' a I %� SCALE IN FEET C N Freese and Nichols, Inc o. Texas Registered Engineering Firm F-2144 REVISION# 00 N CITY OF PEARLANDD AT JOB NPRu6146 z o rrn NICHOLS REHAB. GROUND STORAGE TANKS LE FEB. sal: 2 B N N 11200 Broadway street Suite 2332 CIVIL DESIGNED Peo,lono ee,,77s6a J B Phone - (632)456-4700( _ILIBERTY GROUND STORAGE TANK DRAFTED B H FIGURE www�456-4701 PLAN f'EE Plot Dote 3/7/2016 1 02 PM Plot By 02128 Filename N\WTU\Drawings\UT—PRL—PL—SITE01 dwg Apr le( 1' '''' .''..1 . , 411 '.,,,W,fr, CLEAN THE INTERIOR BOLT SEAMS THEN APPLY A HIGH SOLIDS CIM 100 GRADE RUBBERIZED COATING TO ALL HORIZONTAL AND VERTICAL SEAMS ^ . ON THE TANK SHELL AND AROUND THE N CIRCUMFERENCE OF THE SHELL—TO—FLOOR ,, �'� ' y,. CONNECTION. BRUSH—BLAST THE INTERIOR, THEN �� "- APPLY A 100% SOLIDS EPDXY PER SPECIFICATION '° . 09950 CAULK 176 LF AROUND I THE BASE OF THE TANK AT THE CONNECTION TO THE FOUNDATION (y t 1EXISTING PUMP STATION' - \ ''' 11I ?- . dl EXISTING 428,000 GALLON BOLTED GALVANIZED STEEL 14 ; TANK, APPROX. 56' DIAMETER, 24' SIDEWALL HEIGHT. 4 0 ' /V 1 › `" REMOVE ANTI—CLIMB DEVICE, p • . EXTEND LADDER CAGE TO m ' - _ GROUND LEVEL PER DETAIL :1! "'M�"' z ON FIGURE 4 - 73 EXTEND HANDRAILS AROUND GI THREE SIDES OF THE ROOF HATCH PER HANDRAIL DETAIL ON FIGURE 5. UTILIZE BLUEWATER SAFETYRAIL 2000 ! , .. ,�,. .,, FALL PROTECTION SYSTEM OR APPROVED _EQUAL. 1, r e 00 ;;.11,5 4 mot ,, 10 N 51 O :4164NO \ i 0 >. r; to ' ....... i 0 J 0 a_ o i to 0 50' 100' 1 , I a , SCALE IN FEET F. Freese and Nichols, Inc o' Texas Registered Engineering Firm F-2144 REVISION# i F&N JOB NO i- CITY OF PEARLANDDATr PRL16146 ' F NICHOLS REHAB. GROUND STORAGE TANKS SCALE FEB 2016 1" = 50' 3 0 11200 8r000way Street. uit se 2332 E'ICI Pearlane Texas 77554 CIVIL 'DESIGNED J B Phone- (832)158-4700 SUBURBAN GARDEN GROUND STORAGE TANK DRAFTED B H FIGUREN N -Fax (832)455-4701 J Wee - www.freeee.aam PLAN 1ILE Plot Date 3/7/2016 1 02 PM Plot By 02128 Filename N\WTU\Drowings\UT—PRL—PL—SITE02 c:v I I HANDRAIL tii 3" x HORIZIOW 2" x 3/4" HORIZ Z BOT BAND 'I 'd ,-6„yBANDS LO IM 10. ...._ Y (MIN ) (MIN ) 1'-2" RAD TYP FOR BANDS. 1'—7" RAD. I BOT BAND 12" x 4" VERT. BARS WELDED TO HORIZ. SECTION BAND 1_IL(Lll_I HMI S/S WEDGE ANCHOR - ,- — FALL PREVENTION DEVICE -- 2)¢" X Jc STRINGER -- 2'-6" 8"0 HOLE W/ HOLES FOR RUNGS TYPICAL 3`-5" TOP OF -LADDER BRACES f DOME RING EQUALLY SPACED 1Y" ► 11i1 3" 11 21w x i" 7 SIDE RAIL ics• H 1 i 1 TYP o :11 d I 1111 ... HOOP PL 4"x Y" 1'-6"i 00 HINGED CAGE —1I (-N DOOR W/ HASP M EI )(3" STL PL I ELEVATION 12" //\\\\ 0 co J /,,,, 1 > 1 Q D a1 �cv �^ Freese and Nichols, Inc o u, Texas Registered Engineering Firm F-2144 REVISION # 00 D v F&N JOB NO. CITY OF PEARLAND PRL16146 Z" DATE 1117 NiC2 s REHAB. GROUND STORAGE TANKS SCALE FEB. 2016 0 N T s 4 o0 11200 Broodwoy Street Sonne 2332 N Peoriond T•.o, 77564 CIVIL DESIGNED J B Phone - (632) 456-4700 m m Fox - (e.72)456-4701 DRAFTED — o� wee - www.neese.com B H FIGURE LADDER DETAILS FILE Plot Date 3/7/201 6 1 01 PM Plot By 02128 Filename N\WTU\Drawings\UT—PRL—DT—LADR dwg JOINT TYP. NOTES: 1 J BASE PLATES1 TO BE ANCHORED TO TANK HOLLAENDER t USING S.S. WEDGE ANCHORS. 1—i/2"0 6061—T6 SCH. 40 ANODIZED 2 4" TOE BOARD TO BE PROVIDED ON FRONT 1'-9" ALUMINUM PIPE (TYP.) CIRCUMFERENTIAL HANDRAIL. 3 HANDRAIL SHALL MEET OSHA REQUIREMENTS rI 3'-6" t _1 t- 4" TOE BOARD 1.-9" r (AT FRONT ONLY) SEE NOTE 1 DETAIL NOT TO SCALE 21Y4" 19Yi" E o L GROUND STORAGE TANK 21Y" Q =� " oPrr 33/4" 6' 6" — 90" RAIL LENGTH(TYP.) 6' PLAN (TYP.) NOT TO SCALE 1V*0 ALUMINUM PIPE (1.9" O.D., 1.6" I.D.) EXISTING W"0 STAINLESS STEEL BOLT, • 11¢"0 STEEL ROOF HATCH NUT AND WASHER (ONE ROUND BAR x 4" LADDER AND REQUIRED PER POST) SAFETY CAGE '1 in 1" HANDRAIL (TYP) Y"r 4" SEE THIS SHEET FOR DETAIL Jfi" MITER t t TYP 00 ` Y4" , O,N O Ly >. Y4"X6"X6" PLATE om z _ D , LIBERTY HANDRAIL PLAN CONNCETION DETAIL n_> NOT TO SCALE NOT TO SCALE i� �NJ Freese and Nichols, Inc. o Texos Registered Engineering Firm F-2144 o REVISION# F&N JOB NO. CITY OF PEARLAND PRL16146 FREESE DATE FEB. 2016 Z o NM iNICHOLS REHAB. GROUND STORAGE TANKS SCALE AS SHOWN 5 o 11200 Broadway street,suite 2332 DESIGNED E n Peono d re„o, 775 4 CIVIL J B CO.— Pnor,e - (832)a56-4700 DRAFTED Jwee -(ww rreese c71 B H FIGUREi HANDRAIL DETAIL RILE Plot Date 3/7/201 6 1 02 PM Plot By 02128 Filename N\WTU\Drawings\UT—PRL—DT—HNDR dwg A. APPROVED MANUFACTURER(S). 1. AST MODEL VENT BY ADVANCE TANK AND CONSTRUCTION COMPANY. 2. PRE—APPROVED EQUAL — CONTRACTOR MAY SUBMIT ALTERNATE VENT TO ENGINEER FOR PRE—APPROVAL PRIOR TO BID. VENT SUBMITTAL SHALL INCLUDE MATERIALS, DIMENSIONS, AND THICKNESS INDICATED. B. VENT SHALL BE CONSTRUCTED OF ALUMINUM OR 316 STAINLESS STEEL WITH #16 316 STAINLESS STEEL INSECT SCREEN, MINIMUM DIAMETER IS 24", MEETING CURRENT AWWA AND TECEQ STANDARDS. C. VENT SHALL BE SECURELY FASTENED USING 316 STAINLESS STEEL HARDWARE D VENT SHALL BE PROVIDED WITH PRESSURE—VACUUM RELIEF MECHANISM THAT WILL OPERATE IN THE EVENT THAT THE VENT FLAILS THE MECHANISM SHALL BE DESIGNED TO RETURN AUTOMATICALLY TO ITS ORIGINAL POSITION AFTER OPERATION THE PRESSURE—VACUUM RELIEF MECHANISM SHALL BE LOCATED ON THE TANK ROOF ABOVE THE MAXIMUM WEIR CREST ELEVATION, AND INCORPORATED IN THE VENT ASSEMBLY. HINGED VENT ACTING AS PRESSURE RELIEF WILL NOT BE ACCEPTED. 3/4" DIA. x 2 S.S. BOLTS EQUALLY SPACED 8 24" ID t_._ EXISTING TANK ROOF 1/4" PLATE ROLL TO 30" I.D. W/AWWA C200-88 24" ROOF RUBBER GASKET �. PENETRATION 03 3 0 �o F Z " m N 0 l J a °^ Freese and Nichols, Inc. — Texas Registered Engineering Firm F-2144 REVISION# 00 j\ F&N JOB NO. CITY OF PEARLAND PRL16146 r.If oLS REHAB. GROUND STORAGE TANKS SCALE AS SHOWN AS SHOWN 6 o°J o 11200 4rooa..ey saeeF Su le 2332 DESIGNED J B n Pa,mna ra.a, nsea CIVIL Phone - (8a2)456-4700 B H a) En Fax - (eat)ash-alai DRAFTED •O` Web - www.lreese.cam FIGURE J\ VACUUM RELIEF VENT $'EE Plot Dote 3/7/2016 1 02 PM Plot By 02128 Filename N\WTU\Drawings\UT—PRL—DT—VENT dwg APPENDIX "A" LIBERTY INSPECTION REPORT Pittsburg Tank & Tower Maintenance Co., Inc.® PAINT•REPAIR.DISMANTLE.INSPECT Since 1919 ANKS RAISED, LOWERED AND MOVED • NEW AND PREOWNED TANKS P.O. Box 1849 *Henderson, KY 4241 9-1 849 • TEL (270) 826-9000 • FAX (270) 827-4417 httpl/www.watertank.com E-mail: sales@watertank.com f City of Pearland 3501 East Orange Street Pearland, TX 77581 RE: 3503 Liberty Drive 550,000 Gallon GST November 17, 2015 Ms. Tracy Sambrano Superintendent (281) 652-1799 Job No. 315423-I If you would like to speak with Patrick Heltsley concerning this report, call (270) 826-9000, Ext 253 For additional copies of this report call (270) 826-9000 Ext. 253 City of Pearland ;.' RE: 3503 Liberty Drive SINCE 1919 550,000 Gallon GST =, N %,„ " } +& i +r7,4147.471e.14. i; S M 4010 ' +1.• l ,h mil. • � .e ,44 . M • • ; .- k' • y. • r • Photo shows the condition of the foundation AWWA D100-11, 12 7 1 Founda- tions for flat bottom tanks states, "The tops of the concrete foundations shall be a minimum of 6" above the finished grade, unless otherwise specified " We rec- ommend clearing any dirt, debris and other loose gravel away from the tank foundation, down to a minimum 6" below top of foundation This should be done by a local excavating company 2 Pittsburg Tank & Tower Maintenance Co , Inc November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINCE � 1919 550,000 Gallon GST y 6onabor".4„ .a .. ,.y alMli+M <'�14 " fit x , • x chi +k 4 to . Photo shows the condition of the foundation We recommend repairing any cracks and spalling in the concrete with a commercial non-shrinking grout, then sealing the foundation with a sealant 3 Pittsburg Tank & Tower Maintenance Co , Inc November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINCE 1919 550,000 Gallon GST 3 a^r Photo shows the condition of the foundation. We recommend caulking around the base of the tank to foundation connection to prevent water from entering un- der the tank then sealing the foundation with a sealant. We further recommend inserting sacrificial cathodic protection rods radially eve- ry 15' beneath the floor of the tank to prevent corrosion 4 Pittsburg Tank & Tower Maintenance Co., Inc. November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINCE 1919 550,000 Gallon GST • 'i''�f�yJ . tit , 'Ss t . ♦+'; f F , • f �p} y ui" a , d k t F # S t - IS Photo shows the tank foundation We recommend electrically grounding the tank for lightning protection as required by OSHA 29 CFR 1926 (K) 5 Pittsburg Tank & Tower Maintenance Co , Inc November 17, 2015 City of Pearland ` RE: 3503 Liberty Drive SINCE 1919 550,000 Gallon GST ;; t . Photo shows the condition of the existing 8" drain valve, which is not equipped with splash pad. We recommend installing a splash pad to direct water away from the foundation 6 Pittsburg Tank & Tower Maintenance Co., Inc. November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINCE 1919 550,000 Gallon GST VCONOOMIO � L L 1. Photo shows the condition of the 24" primary shell manway. AWWA D100-11, 7 4 4 Shell manholes states, "Two shell manholes shall be provided in the first ring of the tank shell. At least one manhole shall be circular with a minimum di- ameter of 30" (760 mm)." The primary manway requires the following to be in compliance with AWWA D100-11, 7 4 4 Shell manholes and OSHA 1910 146 (h) (5) (ii)- Confined spaces We recommend- Install davit arm on primary shell manway Install maintenance free galvanized steel bolts as a preventive measure 7 Pittsburg Tank & Tower Maintenance Co , Inc November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINCE 1919 550,000 Gallon GST % it % lk a • A� • 7(11 41 • • •414 ly Photo shows the condition of the 30" secondary shell manway, which is in com- pliance with AWWA D100-11; 7 4 4 Shell manholes and OSHA 1910.146 (h) (5) (ii) Confined spaces We recommend. Install maintenance free galvanized steel bolts as a preventive measure 8 Pittsburg Tank & Tower Maintenance Co , Inc November 17, 2015 City of Pearland '" g , : RE: 3503 Liberty Drive .,_,.sue SINCE1919 550,000 Gallon GST 41 ilio Firm t.-__________________ ,vitete. osi z • 7 , ` , Photos show the 8" overflow pipe system The overflow pipe is not equipped with a screen. We recommend installing a new screen on the existing overflow pipe 9 Pittsburg Tank & Tower Maintenance Co , Inc November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINCE $ 1919 550,000 Gallon GST 1 7 116 14 � .t ~ ye • N • !'` i t• v Shell access ladder in above photos is 16" wide and equipped with anti-skid rungs as required by OSHA 1926 1053(a) and AWWA D100-11, 7.4.1. Ladders General. We recommend installing a cable type safety climb and posting a Fall Protection Required sign at base of ladder. 10 Pittsburg Tank & Tower Maintenance Co , Inc November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINCE : 1919 550,000 Gallon GST ^4� 4a' M { raC n "TM Photo shows the tank is not equipped with a liquid level indicator We recom- mend installing a liquid level indicator, complete with target board and float 11 Pittsburg Tank & Tower Maintenance Co , Inc November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINCE 1919 550,000 Gallon GST --- - - � `' NIIIIIN* isiiiiiipvi V'4 Photo shows the tank roof edge is not equipped with a required handrail system for fall protection OSHA 1910 23 (c)(1) states, "Every open-sided floor or plat- form 4 feet or more above adjacent floor or ground level shall be guarded by a standard railing... on all open sides." The tank is equipped with 42" high hand- rails to the left and right of the access ladder We recommend extending the handrails around the circumference of the tank roof, complete with an intermedi- ate rail, toeboard and a stainless steel swing gate at the junction of the shell-to- roof access ladder and tank roof. 12 Pittsburg Tank & Tower Maintenance Co., Inc. November 17, 2015 City of Pearland RE: 3503 Liberty Drive SIN(_:I 1 9 1 9 550,000 Gallon GST f ` pr Photo shows the condition of the existing 30" roof manway Roof openings on this tank require the following to be in compliance with AWWA D100-11, 7 4 3 Roof openings and OSHA 1910.146 (h) (5) (ii). Confined spaces. We recommend Install 30" secondary manway 180° from primary manway Post Confined Space Entry signs 13 Pittsburg Tank & Tower Maintenance Co , Inc November 17, 2015 City ,03o5f 0P3e Lairblaenrtd DSTrive~- - -- 191 )SINCE 00 Gallon G. -, • s�t P F t „SRC, �`t4` 9 .> 'w. YYt,& r . 1 sac,° b ,`: } 6 \,, , . ,,, - .. , k,: y i• ,.. ,` ' ', ' ' ' " „,,,I. - , ,.. ...%\..v.: ::::t\'' -,..‘,.'•:':- ,...-II"' ' ' -, ViN# ',. .--1' -..,-,,%*•,, ,..****'‘'\\\NAt\\\A ),,-.'", .• • � � , 40 4tik Photos show the condition of the existing 24" roof vent It appears to be in good condition 14 November 17, 2015 Pittsburg Tank & Tower Maintenance Co , Inc City of Pearland RE: 3503 Liberty Drive SINCE, 1 91') 550,000 Gallon GST Photos show the tank exterior coating system. It appears to be in good condi- tion 15 Pittsburg Tank & Tower Maintenance Co., Inc. November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINCE ".� 1919 550,000 Gallon GST y p f.. Photo shows the interior access ladder, which is 16" wide and equipped with an- ti-skid rungs in compliance with AWWA D100-11, 7.4.1. Ladders. Notice the safety rail slide. We recommend installing a cable type ladder safety device at the primary roof manway. We further recommend installing an OSHA compliant interior access ladder complete with standoffs every 10' on center and a cable type ladder safety de- vice at the suggested secondary roof manway. 16 Pittsburg Tank & Tower Maintenance Co , Inc November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINCE 1919 550,000 Gallon GST Photo shows the interior roof, which appears to be in good condition 17 Pittsburg Tank & Tower Maintenance Co., Inc. November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINCE 1919 550,000 Gallon GST `•gym t' f w a..40•40Y• 1 k • M1 Photo shows the interior roof-to-rim angle connection, which appears to be in good condition 18 Pittsburg Tank & Tower Maintenance Co., Inc November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINCE �kk , 1919 550,000 Gallon GST 111411frif ` ao • NFL rv� t Photos show the rafter-to-support column and rafter-to-shell connections, which appear to be in good condition. 19 November 17, 2015 Pittsburg Tank & Tower Maintenance Co , Inc City of Pearland RE: 3503 Liberty Drive SINCE ,° 1919 550,000 Gallon GST 40e. "Ito 's 'Ova 4110 14 t Photo shows a fill pipe on the tank interior. A temperature difference between the water in the top and bottom of a tank, even as little as 1-2 degrees Fahren- heit is an indication of thermal stratification, and the tank water not completely mixed Incomplete mixing would result in short-circuiting and localized increase in water age would develop inside the tank This typically leads to water quality problems, such as loss of residual, DBP spikes, HPC spikes, bacteria regrowth, formation of bio-film, changes in pH and dissolved oxygen. We recommend in- stalling a mixing system 20 Pittsburg Tank & Tower Maintenance Co., Inc. November 17, 2015 City of Pearland RE: 3503 Liberty Drive SINC[. I 550,000 Gallon GST ,C '+ 044) ` t v+a m s Photo shows sediment and debris in the tank We recommend performing an interior cleanout in order to prevent contamination issues associated with exces- sive sediment buildup This work should be performed on an emergency basis. "Please note price for interior cleanout is based on removing 1"- 3"of sediment Any additional accumulation discovered will be priced on site In the event the tank has to be drained, tank will need to be drained by the owner, prior to our arrival We further recommend installing a passive cathodic protection system 21 Pittsburg Tank & Tower Maintenance Co , Inc November 17, 2015 City of Pearland ` � RE: 3503 Liberty Drive SINCEI. 1919 550,000 Gallon GST *r t^ k u y k " sk 9 k "4.0„+ �ftt r f- f t rs ° r v d a ti ': ,:k F ''� t t .a�''{9 A .d,^a �'i ar Ls� r Ka �g f,c rxiY r ' . ' NYC ° Photo shows the condition of the tank floor. After performing the interior cleanout, if buckling is present we recommend stabilizing the floor by pumping grout to the underneath side of the floor where the buckling is occurring. This will be done.by installing couplings in the tank floor, pumping grout at 15# psi, filling the voded areas to prevent any further buckling, then vacuum test floor. Any defective seams will be repaired by welding 22 November 17, 2015 Pittsburg Tank & Tower Maintenance Co., Inc. City of Pearland RE: 3503 Liberty Drive SINCE �>>�> 550,000 Gallon GST r A t n2 ey Wr , ‘' Photos show the condition of the interior coating system. We recommend pres- sure washing the tank interior with biodegradable detergent injection (minimum 3,500 psi at 3.0 gpm) then re-evaluating the tank interior in 2-3 years. 23 Pittsburg Tank & Tower Maintenance Co., Inc. November 17, 2015 Pittsburg Tank & Tower Maintenance Co., Inc.® PAINT.REPAIR.DISMANTLE.INSPECT Since 1919 TANKS RAISED, LOWERED AND MOVED • NEW AND PREOWNED TANKS P.O. Box 1849 *Henderson, KY 42419-1849 • TEL (270) 826-9000 • FAX (270) 827-4417 httplwww.watertank.com E-mail: sales@watertank.com GROUND STORAGE INSPECTION REPORT JOB NO. 315423-I INSPECTOR: David Gross (LS) TANK OWNER: City of Pearland OWNER'S REPRESENTATIVE Ms. Tracy Sambrano TITLE. Superintendent MAILING ADDRESS: 3501 East Orange Street Pearland, TX 77581 PHYSICAL ADDRESS. 3501 East Orange Street Pearland, TX 77581 E-MAIL. tambrano@pearlandtx.gov CITY, STATE Pearland, TX ZIP: 77581 COUNTY: Brazoria County TELEPHONE. (281) 652-1799 FAX (281) 652-1710 LOCATION OF TANK. 3503 Liberty Drive Pearland, TX 77581 City of Pearland 3501 East Orange Street Pearland, TX 77581 November 17, 2015 Ms. Tracy Sambrano Superintendent (281) 652-1799 ORIGINAL CONTRACT NO. Unknown YEAR BUILT. Unknown ORIGINAL MANUFACTURER Unknown CAPACITY. 550,000 Gallon DATE OF LAST INSPECTION Unknown TYPE. Potable DIAMETER. 55'-0" HEIGHT: 32'-0" OVERFLOW 8" INLET 9" TYPE CONSTRUCTION. WELDED. X RIVETED. BOLTED: ACCOUNT EXECUTIVE. Amy Russell Pittsburg Tank & Tower Maintenance Co., Inc. PAINT•REPAIR.DISMANTLE•INSPECT Since 1919 ANKS RAISED, LOWERED AND MOVED • NEW AND PREOWNED TANKS P.O. Box 1849 •Henderson, KY 42419-1849 • TEL (270) 826-9000 • FAX (270) 827-4417 http//www.watertank.com E-mail: sales@watertank.com Testing Exterior Interior Lead Paint Sample Paint Sample Adhesion Al @12 2 A1@12.4 Mil Testing Roof. 10.2 9.72 11.47 11.51 10.69 8.63 7.65 8.64 7.1 8 21 9.37 7.75 5.62 7.71 8.23 9.11 10.21 11.3 Ring 4 7 53 10 25 Ring 3. 8 9 8 67 Ring 2. 9 45 7 24 Ring 1. 10 25 12 21 8 27 9 76 9 42 8 93 9 54 11 69 9 34 9 37 11 64 6 93 7 02 9 24 7 63 5 03 6 64 6 79 11 9 9 49 25 City of Pearland 550,000 Gallon GST Pittsburg Tank & Tower Maintenance Co., Inc.® PAINT.REPAIR.DISMANTLE•INSPECT Since 1919 TANKS RAISED, LOWERED AND MOVED • NEW AND PREOWNED TANKS P.O. Box 1849 *Henderson, KY 42419-1849 • TEL (270) 826-9000 • FAX (270) 827-4417 httpl/www.watertank.corn E-mail: sales©watertank.com UT Testing Roof 0 185 0 186 0 190 0 181 0 185 0 189 0 192 0 186 0191 0185 0172 0191 0188 0175 0163 0181 0188 0 194 Ring 4• 0 249 0 246 Ring 3: 0.247 0.248 Ring 2: 0.249 0.248 Ring 1. 0.256 0.255 0.255 0.257 0.258 0 257 0 259 0 257 26 City of Pearland 550,000 Gallon GST APPENDIX "B" SUBURBAN GARDEN INSPECTION REPORT Pittsburg Tank MANTLE•INS OWNED TANKS 27-4417 & Tower Maintenance Co., Inc PAINT•REPAIR•QISPECT Since 1919 (INKS RAISED, LOWERED AND MOVED • NEW AND PRE P.O. Box 1849 •Henderson, KY 42419-1849 • TEL (27a) 826-90QQ FAX (270) 8 httpt/www.watertartk.com E mail: sales watertank_com h s �' �� f 3 rS 3 xg4�!, `°,��"':4r�2*r f .x^ :: „' va te �n. � < .� City of Pearland 3501 East Orange Street Pearland, TX 77581 RE:• 13711 Suburban Garden Road 450,000 Gallon Bolted GST November 18, 2015 Tracy Sanbrano Superintendent (281) 652-1799 Job No. 315423-G-9 If you would like to speak with Patrick Heltsley concerning this report, call (270) 826-9000, Ext 253 For additional copies of this report call (270) 826-9000 Ext. 253 City of Pearland RE: 13711 Suburban Garden Rd. " f 450 000 Gallon Bolted GST SINCE I )1 .) ar w Iv p* F 4' x A.`Ya4 3 n � u t �;� ;� � � � � as a, � '` cue? ' ' ,¢ 'tr. t�'' �' .a' 4 � :. , xi Photo shows the foundation, which is in compliance with AWWA D103-09; 13.5.1. Height above ground and appears to be in good condition 2 Pittsburg Tank & Tower Maintenance Co., Inc. November 18, 2015 City of Pearland RE: 13711 Suburban Garden Rd. S!NCk-°, 1 9 I a 450,000 Gallon Bolted GST 41P a +gym e a lr * i '� . ,� yr Photo shows the condition of the foundation We also recommend caulking around the base of the tank to foundation connection to prevent water from en- tering under the tank then sealing the tank to foundation connection with a seal- ant. 3 Pittsburg Tank & Tower Maintenance Co , Inc November 18, 2015 City of Pea m RE: 13711 Suburban Garden Rd. SINCE I >1 450,000 Gallon Bolted GST ;:® µ i #` F .,,. p < . ' � . i. ,eltkiii, • . � , , , } .r We also recommend electrically grounding the tank for lightning protection as required by OSHA 29 CFR 1926 (K). 4 November 18, 2015 Pittsburg Tank & Tower Maintenance Co , Inc City of Pearland RE: 13711 Suburban Garden Rd. SING �� 450,000 Gallon Bolted GST Photo shows the condition of the existing drain valve. The drain it allows the tank to be drained The drain valve also shares a pipe fitting that is connected to the overflow. We recommend installing a locking device to prevent unauthorized draining of the tank 5 Pittsburg Tank & Tower Maintenance Co , Inc November 18, 2015 City of Pearland RE: 13711 Suburban Garden Rd. SINCE 1 919 3 450 000 Gallon Bolted GST 'y, 444 * *. ta * 10 ^t, t. % 4434 ‘ . , 64 * + ,, , 10 000. 444 46 . 464444640444 440 # # # # 44 41134 4404 .„ , * S . 0 44340 0 * * 4440 04 . & * 0 . 6 • 4, .0., 8 & & itt $ & # # a 4 1 k 1 4 11 4 4 4 * It 44 * 4 4* 14 .46 46 0 * 6 f 11` 6 * * r i r e r . . ft . , r if it 6 6 e i * 4 4443 4400, 43440 , + # 000 4 6 4 443 . * * • o ft • * 04 4340 * 0 t 444 004 40 ,04,, teat 404 4 * t 4 443 * 44 . , a 43434 44 4 044 4 * 4 t 6 46 46 4 4 tiillibilkii ...-.0.bi. , ,1'. 9" * 9 ' ' . . ° " / tabilibilibit,4 * 'k " ‘ ' _____________ Photo shows the condition of the existing 42"x 50" shell manway, which appears to be in good condition 6 Pittsburg Tank & Tower Maintenance Co , Inc November 18, 2015 City of Pearland .. RE: 13711 Suburban Garden Rd. SINCI 11 1 .) 450,000 Gallon Bolted GST , \ .. ir- . ,,,...,,,, ,, „..,, , i„. „,- ..„ , % ' ' ' ' ."'' '' "" 0' '' SF6a i' i4 411 * . - ' ' * ' ' IIIII 11111 liii. Ili ' ilk it .y ' , Photo shows the 8" overflow pipe system The overflow pipe is not equipped with a flapper valve or screen. We recommend installing a flapper valve and a screen on the existing overflow pipe elbow 7 Pittsburg Tank & Tower Maintenance Co., Inc. November 18, 2015 City of Pearland RE: 13711 Suburban Garden Rd. \I 1( I 191 ,) 450,000 Gallon Bolted GST ' m p ue� Shell access ladder in above photos is 16" wide and equipped with anti-skid rungs as required by OSHA 1926.1053(a) and AWWA D103-09, 7.4.1. Ladders General We recommend installing a cable type ladder safety climb and posting a Fall Protection Required sign at base of ladder 8 Pittsburg Tank & Tower Maintenance Co , Inc November 18, 2015 City of Pearland -- RE: 13711 Suburban Garden Rd. 450,000 Gallon Bolted GST ti I At Photo shows the tank is not equipped with a liquid level indicator We recom- mend installing a liquid level indicator, complete with target board and float. 9 Pittsburg Tank & Tower Maintenance Co , Inc November 18, 2015 City of Pearland RE: 13711 Suburban Garden Rd. SINCE Y 1919 450,000 Gallon Bolted GST 4111116110011th„ , 4 II ..., saw ill u _ 3. 4. k Photo shows the tank roof edge is not equipped with a required handrail system for fall protection OSHA 1910 23 (c)(1) states, "Every open-sided floor or plat- form 4 feet or more above adjacent floor or ground level shall be guarded by a standard railing on all open sides " The tank is equipped with 44" high hand- rails to the left and right of the access ladder. We recommend extending the handrails around the circumference of the tank roof, complete with an intermedi- ate rail, toeboard and a stainless steel swing gate at the junction of the shell-to- roof access ladder and tank roof 10 Pittsburg Tank & Tower Maintenance Co , Inc November 18, 2015 City of Pearland 41..E RE: 13711 Suburban Garden Rd. SINCE. 1919 450,000 Gallon Bolted GST • Photo shows the condition of the existing 30" roof manway Roof openings on this tank require the following to be in compliance with AWWA D103-09, 7 6. Roof openings and OSHA 1910 146 (h)(2)(ii) Confined spaces We recommend- Install 30" secondary manway 180° from existing manway Post Confined Space Entry signs 11 Pittsburg Tank & Tower Maintenance Co , Inc November 18, 2015 City of Pearland RE: 13711 Suburban Garden Rd. " w SINCE ' 450,000 Gallon Bolted GST 19l'�� ''''''ss'''''''''N'*'Nkk:sv,,,,s . 4fr 471r1 i 0 .�. *3 4 4 4 I fi to rr e , -0-" y ,44 fir+ At A Al T. PA ifF44 Photos show the condition of both roof vents The vents appear to be in good condition. 12 Pittsburg Tank & Tower Maintenance Co., Inc. November 18, 2015 City of Pearland �� • ` � = RE: 13711 Suburban Garden Rd. SINCLu E,I L, 450,000 Gallon Bolted GST x � • , ,4^ A r .n.. .. . . . «r sir r . cE • w + .w • " • a + +rx eas • a • 14 aa- {•w A ! • W ak x • O- a a Photos show the exterior coating system. It appears to be in good condition. 13 Pittsburg Tank & Tower Maintenance Co , Inc November 18, 2015 City of Pearland RE: 13711 Suburban Garden Rd. E , 0IL) 450,000 Gallon Bolted GST P 3 if }t railmiwilb rk A' """' insio 11111111111111111111 / , Photo shows the interior access ladder, which is 16" wide and equipped with an- ti-skid rungs in compliance with AWWA D103-09, 7.4.2. Ladders. We recom- mend replacing the existing safety climb device with a cable type ladder safety device at the existing roof manway. We further recommend installing OSHA compliant interior access ladder complete with standoffs every 10' on center and cable type ladder safety device at the suggested secondary roof manway. 14 Pittsburg Tank & Tower Maintenance Co , Inc November 18, 2015 City of Pearland `" RE: 13711 Suburban Garden Rd. SINCE , 1919 450,000 Gallon Bolted GST w , 0 3 l ,al ti .,„,.�.... q3, u 1 FA i �kby .„,, ,. Ns\ ,.,,,,..44, , . „:,.. )0,. ... „ , ,..„ „,,,,,,. :, , ,, .,„ ,.., ,,,,,. .,. ,, -,.,, ,, „.„,..,.... ,,,,,,414„, , , ‘,i,,,... , ., „:P "ova .,, low, Photos show the interior roof, which appears to be in good condition 15 Pittsburg Tank & Tower Maintenance Co., Inc. November 18, 2015 City of Pearland M _ RE: 13711 Suburban Garden Rd. SINCE 1919 450,000 Gallon Bolted GST il ew ,an Photo shows the condition of the center support column, which appears to be in good condition 16 Pittsburg Tank & Tower Maintenance Co , Inc November 18, 2015 City of Pearland RE: 13711 Suburban Garden Rd. SINCE1919 450,000 Gallon Bolted GST 5 & r,. ar 400 :. .� . • 1011A' Photo shows a fill pipe on the tank interior. A temperature difference between the water in the top and bottom of a tank, even as little as 1-2 degrees Fahren- heit is an indication of thermal stratification, and the tank water not completely mixed Incomplete mixing would result in short-circuiting and localized increase in water age would develop inside the tank This typically leads to water quality problems, such as loss of residual, DBP spikes, HPC spikes, bacteria regrowth, formation of bio-film, changes in pH and dissolved oxygen We recommend in- stalling a mixing system 17 Pittsburg Tank & Tower Maintenance Co , Inc November 18, 2015 City of Pearland RE: 13711 Suburban Garden Rd. n( t , ,, , ,) 450,000 Gallon Bolted GST 00. wit dl• S OOP 17 ! • f i 44* T tl Photo shows sediment and debris in the tank We recommend performing an interior cleanout in order to prevent contamination issues associated with exces- sive sediment buildup. This work should be performed on an emergency basis. We further recommend installing a passive cathodic protection system 18 Pittsburg Tank & Tower Maintenance Co , Inc November 18, 2015 City of Pearland RE: 13711 Suburban Garden Rd. l ) I ) 450,000 Gallon Bolted GST a �-' � u Photo shows a suction pipe on the interior of the tank and is equipped anti- vortex plate on the suction pipe to prevent formation of a vortex 19 Pittsburg Tank & Tower Maintenance Co., Inc November 18, 2015 City of Pearland RE: 13711 Suburban Garden Rd. SINCE , ,, , 450,000 Gallon Bolted GST v,R i 5 F C ..ems a +. air . .b .40 Photos show the condition of the interior coating system We recommend brush -blasting the tank interior, then applying an epoxy liner to achieve 8-10 mils of dry film thickness 20 Pittsburg Tank & Tower Maintenance Co., Inc. November 18, 2015 City of Pearland RE: 13711 Suburban Garden Rd. SINCE_. 1919 450,000 Gallon Bolted GST i flan ' 1 Vie, :t A ; �s � � _, y , ....�.:. " yg v y i • / e aF t Ak X. 4 i 2 $ Photos show the tank interior bolt seams We recommend cleaning the interior seams, then as needed applying a high solids CIM 1000 Trowel grade rubber- ized coating to all horizontal and vertical seams on the tank shell and around the circumference of the shell-to-floor connection This coating allows up to 350% elongation due to contraction and expansion caused by thermal shifts as well as filling and draining of the tank. All seams will be dry prior to application for proper adhesion CIM is a flexible coating that also responds to potential leaks This product is applied thicker than most coatings at up to 30 mils result- ing in longer life 21 November 18, 2015 Pittsburg Tank & Tower Maintenance Co., Inc. r. Pittsburg Tank & Tower Maintenance Co., Inc.® PAINT•REPAIR•DISMANTLE•INSPECT ""` 11 TANKS RAISED, LOWERED AND MOVED • NEW AND PREOWNED TANKS P.O. Box 1849 *Henderson, KY 42419-1849 • TEL (270) 826-9000 • FAX (270) 827-4417 httpl/www.watertank.com E-mail: sales@watertank.com BOLTED GROUND STORAGE INSPECTION REPORT JOB NO. 315423-G-9 INSPECTOR David Gross (SL) TANK OWNER City of Pearland OWNER'S REPRESENTATIVE Tracy Sanbrano TITLE Superintendent MAILING ADDRESS. 3501 East Orange Street, Pearland TX 77581 PHYSICAL ADDRESS 3501 East Orange Street, Pearland TX 77581 E-MAIL: tsambrano@pearlandtx.gov CITY, STATE. Pearland, TX ZIP. 77581 COUNTY: Brazoria TELEPHONE. (281) 652-1799 FAX. (281) 652-1710 LOCATION OF TANK. 13711 Suburban Garden Road, Pearland TX 77581 City of Pearland 3501 East Orange Street Pearland, TX 77581 November 18, 2015 Tracy Sanbrano Superintendent (281) 652-1799 ORIGINAL CONTRACT NO. Not Provided YEAR BUILT. Not Provided ORIGINAL MANUFACTURER. Not Provided CAPACITY. 450,000 Gallon DATE OF LAST INSPECTION Not Provided TYPE Potable DIAMETER 55'- 0" HEIGHT. 24'- 0" OVERFLOW 8" INLET. 10" TYPE CONSTRUCTION: WELDED RIVETED. BOLTED. X ACCOUNT EXECUTIVE. Amy Russell f Pittsburg Tank & Tower Maintenance Co. Inc.® PAINT•REPAIR.DISMANTLE.INSPECT sic 1919 ANKS RAISED, LOWERED AND MOVED • NEW AND PREOWNED TANKS P.O. Box 1849 .Henderson, KY 42419-1849 • TEL (270) 826-9000 • FAX (270) 827-4417 lmp//www.watertank.corn E-mail: sales@watertank.com UT Testing Roof. 0197 0192 0.201 0.195 0.197 0.191 0.191 0.193 0197 0191 0191 0193 0195 0.197 0.184 0.190 0 200 0 202 0 195 0 193 0.206 0.199 0.193 0.195 0 197 0 184 0 190 0 200 0 202 0 195 0 193 0.206 0 199 0 193 0 194 0 199 0 200 0 201 0 197 0 193 0.194 0.197 0.198 0199 0197 0196 0195 0197 Ring 3' 0 143 0 145 Ring 2 0 188 0 188 Ring 1 0251 0248 0250 0248 0251 0256 0251 0252 0 251 0 252 0 251 0 250 0 250 0 251 0 248 0 258 0 248 0 250 0 251 0 249 0 249 0 251 0 250 0 249 0.249 0.250 0.252 0.248 0.248 0.247 0.247 0.246 0 250 0.251 0.251 0.251 0.251 0.251 0.250 0.251 0 252 0 251 0 256 0 252 0 251 0 252 0 256 0.251 0 256 0 251 0 250 0 251 0 251 0 252 0 252 0 250 0 251 0 252 0 249 0 251 0 250 0 249 0 249 0 256 0 251 0 252 0 251 0 251 0 251 0 252 0 252 0 251 0 245 0 253 Floor: 0 259 0.253 0.261 0.263 0.245 0.260 0.259 0.257 0.256 0.258 0.263 0.263 0.263 0.264 0.255 0.259 0 261 0 252 0 256 0 258 0 256 0 258 0 254 0 253 0.254 0.254 0.251 0.251 0.255 0.254 0.261 0.255 0.253 0.256 0.255 0.258 0.260 0.257 0.251 0.251 0 251 0.249 23 City of Pearland 450,000 Gallon Bolted GST