R-2016-132 2016-07-25RESOLUTION NO. R2016-132
A Resolution of the City Council of the City of Pearland, Texas,
authorizing a contract for construction materials testing services
with Terracon Consultants, Inc., for the Reflection Bay Water
Reclamation Facility 6 MGD Expansion Project, in the amount of
$272,555.00, contingent upon the closing of the TWDB loan for this
project on August 4, 2016.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That proposals for construction materials testing services associated with
the Reflection Bay Water Reclamation Facility Expansion Project have been reviewed and
tabulated.
Section 2. That the City Council hereby awards the contract to Terracon
Consultants, Inc., in the amount of $272,555.00.
Section 3. The City Manager or his designee is hereby authorized to execute a
contract for construction materials testing services associated with the Reflection Bay Water
Reclamation Facility 6 MGD Expansion Project, contingent upon the closing of the TWDB
loan for this project on August 4, 2016.
PASSED, APPROVED and ADOPTED this the 25th day of July. A.D., 2016.
ATTEST:
UNG�iRFING,
TY S' ' RETARY
APPROVED AS TO FORM:
DARRIN M. COKER
CITY ATTORNEY
TOM REID
MAYOR
Resolution No. R2016-132
CONTRACT FOR PROFESSIONAL SERVICES
THIS CONTRACT is entered into upon final execution by and between the City of Pearland
("CITY") and Terracon Consultants, Inc. ("CONSULTANT").
The CITY engages the CONSULTANT to perform Construction Materials Testing Services for a
project known and described as Reflection Bay Water Reclamation Facility Expansion
("PROJECT"). (Project # WW1405)
SECTION I - SERVICES OF THE CONSULTANT
The CONSULTANT shall perform the following professional services to CITY standards and in
accordance with the degree of care and skill that a professional in Texas would exercise under
the same or similar circumstances:
A. The CONSULTANT shall perform Construction Materials Testing Services. See
Exhibit A, attached, for a detailed SCOPE OF WORK. The PROJECT schedule
shall conform to the construction schedule.
B. The CONSULTANT shall prepare and submit a detailed opinion of estimated cost
of the PROJECT.
C. The CONSULTANT acknowledges that the CITY (through its employee
handbook) considers the following to be misconduct that is grounds for
termination of a CITY employee: Any fraud, forgery, misappropriation of funds,
receiving payment for services not performed or for hours not worked,
mishandling or untruthful reporting of money transactions, destruction of assets,
embezzlement, accepting materials of value from vendors, or consultants, and/or
collecting reimbursement of expenses made for the benefit of the CITY. The
CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY
employee to engage in such misconduct.
D. The CONSULTANT recognizes that all drawings, special provisions, field survey
notes, reports, estimates and any and all other documents or work product
generated by the CONSULTANT under the CONTRACT shall be delivered to the
CITY upon request, shall become subject to the Open Records Laws of this State.
Design 1 of 5 D2. Revised 2/14
E. The CONSULTANT shall procure and maintain for the duration of this
Agreement, insurance against claims for injuries to persons, damages to property,
or any errors and omissions relating to the performance of any work by the
CONSULTANT, its agents, employees or subcontractors under this Agreement,
as follows:
(1) Workers' Compensation as required by law.
(2) Professional Liability Insurance in an amount not less than $1,000,000 in
the aggregate.
(3)
Comprehensive General Liability and Property Damage Insurance with
minimum limits of $1,000,000 for injury or death of any one person,
$1,000,000 for each occurrence, and $1,000,000 for each occurrence of
damage to or destruction of property.
(4) Comprehensive Automobile and Truck Liability Insurance covering
owned, hired, and non -owned vehicles, with minimum limits of
$1,000,000 for injury or death of any one person, $1,000,000 for each
occurrence, and $1,000,000 for property damage.
The CONSULTANT shall include the CITY as an additional insured under the
policies, with the exception of the Professional Liability Insurance and Workers'
Compensation. Certificates of Insurance and endorsements shall be furnished to
the CITY before work commences. Each insurance policy shall be endorsed to
state that coverage shall not be suspended, voided, canceled, and/or reduced in
coverage or in limits ("Change in Coverage") except with prior written consent of
the CITY and only after the CITY has been provided with written notice of such
Change in Coverage, such notice to be sent to the CITY either by hand delivery to
the City Manager or by certified mail, return receipt requested, and received by
the City no fewer than thirty (30) days prior to the effective date of such Change
in Coverage. Prior to commencing services under this CONTRACT,
CONSULTANT shall furnish CITY with Certificates of Insurance, or formal
endorsements as required by this CONTRACT, issued by CONSULTANT'S
insurer(s), as evidence that policies providing the required coverage, conditions,
and limits required by this CONTRACT are in full force and effect.
F. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and
employees, harmless from any claim, loss, damage, suit, and liability of every
kind for which CONSULTANT is legally liable, including all expenses of
litigation, court costs, and attorney's fees, for injury to or death of any person, for
damage to any property, or errors in design, any of which are caused by the
negligent act or omission of the CONSULTANT, his officers, employees, agents,
or subcontractors under this CONTRACT.
Design 2 of 5 D2 Revised 2/14
G. All parties intend that the CONSULTANT, in performing services pursuant to this
CONTRACT, shall act as an independent contractor and shall have control of its
own work and the manner in which it is performed. The CONSULTANT is not to
be considered an agent or employee of the CITY.
SECTION II - PERIOD OF SERVICE
This CONTRACT will be binding upon execution and end upon completion of the construction
related work not to exceed 33 months after execution of this contract.
Design
SECTION III - CONSULTANT'S COMPENSATION
A. The total compensation for the services performed shall not exceed $272,555.00.
B. The CITY shall pay the CONSULTANT in monthly installments based upon Unit
Prices shown in the SCOPE OF WORK attached.
C. The CITY shall make payments to the CONSULTANT within thirty (30) days
after receipt and approval of a detailed invoice. Invoices shall be submitted on a
monthly basis.
SECTION IV - THE CITY'S RESPONSIBILITIES
A. The CITY shall designate a project manager during the term of this CONTRACT.
The project manager has the authority to administer this CONTRACT and shall
monitor compliance with all terms and conditions stated herein. All requests for
information from or a decision by the CITY on any aspect of the work shall be
directed to the project manager.
B. The CITY shall review submittals by the CONSULTANT and provide prompt
response to questions and rendering of decisions pertaining thereto, to minimize
delay in the progress of the CONSULTANT'S work. The CITY will keep the
CONSULTANT advised concerning the progress of the CITY'S review of the
work. The CONSULTANT agrees that the CITY'S inspection, review,
acceptance or approval of CONSULTANT'S work shall not relieve
CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or
its sub-consultant(s) or in any way affect the CONSULTANT's status as an
independent contractor of the CITY.
3 of 5
D2 Revised 2/14
TERMINATION
Design
A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason -
- with or without cause -- by delivering written notice to CONSULTANT
personally or by certified mail at 551 League City Parkway, Suite F, League
City, TX 77573. Immediately after receiving such written notice, the
CONSULTANT shall discontinue providing the services under this CONTRACT.
B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all
drawings, special provisions, field survey notes, reports, estimates and any and all
other documents or work product generated by the CONSULTANT under the
CONTRACT, entirely or partially completed, together with all unused materials
supplied by the CITY on or before the 15t day following termination of the
CONTRACT.
C. In the event of such termination, the CONSULTANT shall be paid for services
performed prior to receipt of the written notice of termination. The CITY shall
make final payment within sixty (60) days after the CONSULTANT has delivered
to the CITY a detailed invoice for services rendered and the documents or work
product generated by the CONSULTANT under the CONTRACT.
D. If the remuneration scheduled under this contract is based upon a fixed fee or
definitely ascertainable sum, the portion of such sum payable shall be
proportionate to the percentage of services completed by the CONSULTANT
based upon the scope of work.
E. In the event this CONTRACT is terminated, the CITY shall have the option of
completing the work, or entering into a CONTRACT with another party for the
completion of the work.
F. If the CITY terminates this CONTRACT for cause and/or if the CONSULTANT
breaches any provision of this CONTRACT, then the CITY shall have all rights
and remedies in law and/or equity against CONSULTANT. Venue for any action
or dispute arising out of or relating to this CONTRACT shall be in Brazoria
County, Texas. The laws of the State of Texas shall govern the terms of this
CONTRACT. The prevailing party in the action shall be entitled to recover its
actual damages with interest, attomey's fees, costs and expenses incurred in
connection with the dispute and/or action. CONSULTANT and CITY desire an
expeditious means to resolve any disputes that may arise between under this
CONTRACT. To accomplish this, the parties agree to mediation as follows: If a
dispute arises out of or relates to this CONTRACT, or the breach thereof, and if
the dispute cannot be settled through negotiation, then the parties agree first to try
in good faith, and before pursuing any legal remedies, to settle the dispute by
mediation of a third party who will be selected by agreement of the parties.
4 of 5
D2 Revised 2/14
SECTION VI — ENTIRE AGREEMENT
This CONTRACT represents the entire agreement between the CITY and the CONSULTANT
and supersedes all prior negotiations, representations, or contracts, either written or oral. This
CONTRACT may be amended only by written instrument signed by both parties.
SECTION VII — COVENANT AGAINST CONTINGENT FEES
The CONSULTANT affirms that he has not employed or retained any company or person, other
than a bona fide employee working for the CONSULTANT to solicit or secure this
CONTRACT, and that he has not paid or agreed to pay any company or person, other than a
bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other
consideration, contingent upon or resulting from the award or making of the CONTRACT. For
breach or violation of this clause, the CITY may terminate this CONTRACT without liability,
and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise
recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent
fee that has been paid.
SECTION VIII- SUCCESSORS AND ASSIGNS
This CONTRACT shall not be assignable except upon the written consent of the parties hereto.
Design 5 of 5
0'7•
DATE
7fZzo/6
DATE
D2 Revised 2/14
lierracon
March 14, 2016
Updated July 6, 2016
City of Pearland
3519 Liberty Drive
Pearland, Texas 77581
Attn: Ms. Andrea Brinkley
Andrea Brinklev/COPAci.pearland.tx.us
Subject: Cost Estimate for Construction Services
Reflection Bay Water Reclamation Facility -Expansion Project
Pearland, Texas
Terracon Proposal Number P91161072 Revision 1
Dear Ms. Brinkley:
Terracon Consultants, Inc. (Terracon) is pleased to provide this Cost Estimate to the City of
Pearland. We understand we have been selected based on our qualifications to provide
materials testing services for the referenced Project. In this letter we have presented our
understanding of the scope of the project, the proposed services, and the budget estimate.
This Cost Estimate has been revised to accommodate testing for Augured Cast Piles in
lieu of Drilled Piers.
PROJECT INFORMATION
The City of Pearland (City) plans to commence Phase II and Phase III of the expansion of the
existing WWTP site at 1818 Reflection Bay Drive. The estimated schedule to complete the
Project is 33 months (1000 days).
The scope of work will include:
• New Head works structure
• Modifications to lift station
• Modifications to existing SBR
• Construction of 4 new SBRs
• Construction of new blower and electric building
• Construction of 2 new tertiary filter basins
• Construction of new chemical feed and electric building
• Construction of 2 new aerated sludge holding tanks
• Various new pads
• Piping and appurtenances
• Paving and drainage for site
Terracon Consultants, Inc. 551 League City Parkway, Suite F League City, TX 77573
P 1281] 557 2900 F 1281) 557 2990 terracon.com
Geotechnical
• Environmental • Construction Materials • Facilities
Cost Estimate for Materials Services
Reflection Bay Water Reclamation Facility Expansion Project
Pearland, Texas
March 14, 2016 Updated 7.6.2016 Terracon Project No. 91161072 Rev 1
lierracon
Foundation types for the various structures are proposed to consist of deep foundation, such as
augured cast piles, and shallow foundation such as continuous footings and slab on
grade/grade beam systems. The buildings are either prefabricated metal buildings
(blower/electrical building and tertiary filter building), and precast building (sludge and service
building).
SCOPE OF SERVICES
Project Plans and Specifications dated January 2016 were prepared by CDM. Terracon
proposes to provide the following scope of services, when scheduled by the City of Pearland
(City) representative.
1.0 Earthwork:
Observe proof rolling operations, sample subgrade, select fill, trench backfill and
treated materials. Prepare and test the samples for classification by the Atterberg
Limits and moisture density relationship.
Obtain subgrade sample for lime determination test.
Perform gradations on lime treated material.
Perform field density tests using the nuclear method to determine the moisture
content and percent compaction of the subgrade, fill, and backfill.
Obtain random samples of the select fill during placement and test for Atterberg
Limits to verify compliance with the Plasticity Index requirement.
2.0 Augured Cast Piles (ACP):
Test Piles Installation:
Y Terracon on site to observe installation of test piles and reaction piles.
Y Cast compressive strength samples for grout.
Test Pile Loading:
➢ Terracon on site to observe and document the test procedures and loading
data. Data will be submitted to the Geotechnical Engineer of Record for
analysis and recommendation.
Production Piles:
Y Observe the installation of the auger cast piles. Record the size of the shaft
(including the length and auger diameter). The number, size and length of
reinforcing bars used will be documented.
»The calculated grout volume pumped into each shaft will be documented.
YSample the grout material used for the pile system. Two sets of 6 grout cubes
for each day's placement. Three samples will be tested at 7 days and three
samples will be tested at 28 days.
Cost Estimate for Materials Services
Reflection Bay Water Reclamation Facility Expansion Project
Pearland, Texas
March 14, 2016 Updated 7.6.2016 Terracon Project No. 91161072 Rev 1
1Cerracon
We strongly recommend that Terracon be invited to the preconstruction meeting(s).
Additional Services:
If work beyond the scope listed above is requested by the Client, Terracon will issue a short
Supplement to the Agreement form, or Supplement Cost estimate, that outlines the additional
work to be performed and the associated fees. To authorize us to begin this additional work,
you simply return a signed copy of the Supplement.
Project Schedule:
Field testing services will be provided on a "call -out" basis when scheduled by your
representative. A minimum of 24 -hours notice is required to schedule our services (48
hours for structural steel), although we will attempt to meet requests in a shorter time frame.
Terracon will only provide testing when called by your onsite representative. The extent of our
observations and documentation will be limited to the items observed during the site visits.
G. COMPENSATION
Our estimated total budget to perform the testing is $272,555. A breakdown of this budget
is attached. Please note that this is only a budget estimate and not a not -to -exceed price. Many
factors beyond our control, such as weather and the contractor's schedule, will dictate the final
fee for our services. We will not exceed our estimated budget amount unless authorized by The
City of Pearland.
Fees for services provided will be based on the unit rates shown in the attached Budget
Estimate. Services not included in this cost estimate, which may be requested or provided
throughout the job, will be billed at Terracon rates, attached.
Overtime is defined as all hours in excess of eight per day, Monday through Friday, and all
hours worked on weekends and holidays. Overtime rates will be 1.5 times the hourly rate
quoted. A 4 -hour minimum charge will be applied to site visits other than sample or cylinder
pickups. You will be invoiced on a monthly basis for services actually performed.
TESTING AND OBSERVATION
Owner understands that testing and observation are discrete sampling procedures, and that
such procedures indicate conditions only at the depths, locations, and times the procedures
were performed. Terracon will provide test results and opinions based on tests and field
observations only for the work tested. Owner understands that testing and observation are not
continuous or exhaustive, and are conducted to reduce — not eliminate — project risk. Owner
agrees to the level or amount of testing performed and the associated risk. Owner is
responsible (even if delegated to contractor) for notifying and scheduling Terracon so Terracon
can perform these services. Terracon shall not be responsible for the quality and completeness
of Owner's contractor's work or their adherence to the project documents, and Terracon's
performance of testing and observation services shall not relieve contractor in any way from its
responsibility for defects discovered in its work, or create a warranty or guarantee. Terracon will
not supervise or direct the work performed by contractor or its subcontractors and is not
responsible for their means and methods.
Cost Estimate for Materials Services
Reflection Bay Water Reclamation Facility Expansion Project
Pearland, Texas
March 14, 2016 Updated 7.6.2016 Terracon Project No. 91161072 Rev 1
lierracon
AUTHORIZATION
Per Agreement between City of Pearland and Terracon, to be issued by City of Pearland.
We appreciate your continued trust in our services. Please call us at 281-557-2900 if you have
any questions or comments regarding this document.
Sincerely,
Terracon Consultants, Inc.
Noosha P. Smith, P.E. Scott Englebert, P.E.
Sr. Principal Materials Department Manager
Attachment: Budget Table
Cost Estimate for Materials Services
Reflection Bay Water Reclamation Facility Expansion Project
Pearland, Texas
March 14, 2016 Updated 7.6.2016 Terracon Project No. 91161072 Rev 1
Budget Estimate
Reflection Bay Water Reclamation Facility
Facility Expansion Project
Service
lierracon
Quantlt Unit Unit Rate
Estim ate
1.0 Field
Based on average 8 hour days for 400 days
Engineering Technician
Engineering Technician, OT
Certified Wedding Inspector
UT Equipment for full penetration welds
3050
460
120
2
hour
hour
hours
days
$ 55.00
$ 82.50
$ 95.00
$ 100.00
$ 167,750.00
$ 37,950.00
$ 11,400.00
$ 200.00
$ 217,300.00
2.0 Laboratory
Moisture Density Relationship
Atterberg Limits for proctors
Atterberg Limits for select fill verification
-200 Sieve analysis
Gradations for base
Lime Determination
Cylinder Tests (4 cyl/set )
Compressive Strength Test for Grout (ACP) (6 samples per
set)x 2 sets day
Asphalt Lab Series
8
8
12
20
1
1
880
100
1
each
each
each
each
each
each
each
set
sets
$ 150.00
$ 50.00
$ 50.00
$ 50.00
$ 300.00
$ 400.00
$ 14.00
$ 200.00
$ 450.00
$ 1,200.00
$ 400.00
$ 600.00
$ 1,000.00
$ 300.00
$ 400.00
$ 12,320.00
$ 20,000.00
$ 450.00
$ 36,670.00
3.0 Project Management & Administration
Project Manager
Administrative/Clerical
Project Engineer, P.E.
75
45
16
hour
hour
hour
$ 125.00 $
$ 50.00 $
$ 175.00 $
9,375.00
2,250.00
2,800.00
14,425.00
Sub -Total $ 268,395.00
Line Item for ACP Test Piles
Based on installation of 3 test piles and reaction piles( total 2 site visits per pile)
Engineering Technician 52 hour $ 55.00 $ 2,860.00
Project Engineer Review
Compressive Strength Test for Grout (ACP) (6 samples per
set)
4 hour $ 175.00 $ 700.00
3 $ 200.00 $ 600.00
Sub -Total $ 4,160.00
set
Project Total $ 272,555.00