R-2016-048 2016-03-28RESOLUTION NO. R2016-48 A Resolution of the City Council of the City of Pearland, Texas, approving Task Order B amendment with Cobb Fendley & Associates for construction management and construction observation services for the Hooper Road Project in the estimated amount of $56,610. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City council previously approved a Master Services Agreement with Cobb Fendley. Section 2. That the City Council hereby approves Task Order B amendment under the Master Service Agreement. in the estimated amount of 56,610.00, for services associated with the Hooper Road Project. Section 3. The City Manager or his designee is hereby authorized to execute Task Order B amendment associated with the Hooper Road Project. PASSED, APPROVED and ADOPTED this the 28"' day of March, A.D., 2016. ATTEST: APPROVED AS TO FORM: DARRIN M. CO ER CITY ATTORNEY TOM REID MAYOR Resolution No. R2016-48 ATTACHMENT A TASK ORDER No. 1B (REVISED 3-15-16) MASTER SERVICE AGREEMENT (MSA), Task Order No. 1B (REVISED 3-15-16) Pursuant and subject to the above captioned MSA dated July 27,2015 between the City of Pearland and Cobb Fendley & Associates. CLIENT hereby requests that CONSULTANT performs the work described below upon the terms set forth. CLIENT PROVIDED INFORMATION: Work Site Hooper Road Work to Be Performed: Serve as the City's Construction Manager and Construction Observer for the Construction Phase of Hooper Rd including One Year Warranty Period walk-through. Drawings, plans, specifications are not attached Date and Time to Commence Date and Time to Complete Equipment, vehicles, tools, materials, supplies to he furnished or obtained through third parties by CLIENT (if any): Costs include mileage. Invoice Mailing Instructions Invoices will be sent to Valerie Marvin Other Requirements or Variance from MSA (if any): N/A CONSULTANT PROVIDED INFORMATION: Compensation: $179,000 (estimate) Billing Terms Time and Materials Scope of Work CobbFendley will provide Construction Management and Construction Observation for the Construction Phase of the Hooper Road project. The scope of services provided will be generally in line with Construction Administration services and Management Services 2.1-2.5, Construction Inspection Services 3.1-3.10, Pay Applications 4.1-4.2, Document Control 5.1, Change Orders 6.1-6.3, Testing Laboratory and Results 7.1, Project Completion and Close out 8.1-8.5 and Warranty Period 9.1-9.5 as described in Exhibit C — Program Management Scope of Services. ACCEPTANCE: The foregoing TASK ORDER is accepted on the terms set forth as indicated by the signatures below. CONSULTANT COB By: Printed Name: Title. Date 3—/S -1k4, & A OCIATES, INC. CLIENT City of Pearla By Printed Title: Date CobbFendley ATTACHMENT A Manhour Estimate Project Title: Hooper Rd (Lower Kirby Program Management) Task Order No. 1B (REVISED 3-15-16) Construction Management and Inspection 3/15/2016 Construction Phase Duration 365 Days 12 months List of classifications and rates TOTALS Senior Project Manager Construction Manager Construction Inspector Clerical Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 $190 S150 590 570 Construction Phase Duration 365 Days 12 months Notes: 1. Senior Project Manager hours are for meetings and correspondence. 2. Construction Manager hours are based on 2 hours per week for the first and last two months of the project and ramp up to 4 hours per week during the middle of the project. 3. Construction Observer hours are based on 20 hours per week for the first and last two months of the project and ramp up to 40 hours per week during the middle of the project. 4. Mileage is based on 20 trips per month for Construction Observer. 5 trips per month for Construction Manager/Sr. Project Manager. (Mileage is estimated from Pearland Office to Project site) Hours/Month TOTALS Labor Cost Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Construction Phase Senior Project Manager 64 $ 12,160 8 8 4 4 4 4 4 4 4 4 8 8 Construction Manager 144 $ 21,600 8 8 12 12 16 16 16 16 12 12 8 8 Construction Observer 1520 S 136.800 80 80 120 160 160 160 160 160 160 120 80 80 Clerical 28 S 1.960 3 3 2 2 2 2 2 2 2 2 3 3 Total CM Labor Costs $ 172,520.00 Total Equip/Misc Cost (See Below) $ 6,480 Total Estimated Costs $ 179,000 Equipment and Misc Cost Items Units/Month Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Supplies Cell Phones Computer (hrs/month) Mileage @ $0.54/mile 12.000 $ 6.480 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1.000 1600 1,000 1.000 1.000 Subtotal $ 6.480 $ 6,480 Notes: 1. Senior Project Manager hours are for meetings and correspondence. 2. Construction Manager hours are based on 2 hours per week for the first and last two months of the project and ramp up to 4 hours per week during the middle of the project. 3. Construction Observer hours are based on 20 hours per week for the first and last two months of the project and ramp up to 40 hours per week during the middle of the project. 4. Mileage is based on 20 trips per month for Construction Observer. 5 trips per month for Construction Manager/Sr. Project Manager. (Mileage is estimated from Pearland Office to Project site) ATTACHMENT B COBB. FENDLEY & ASSOCIATES. INC. 2015 REVISED STANDARD RATE SCHEDULE Principal / Chief Engineer (Professional VIII)* $210.00/HR Senior Project Manager (Professional VI)* $190.00/HR Project Manager (Professional V)* $165.00/HR Senior Hydrologist (Professional V)* $190.00/HR Project Engineer III (Professional III)* $130.00/HR Project Engineer II (Professional II)* $120.00/HR Project Engineer I (Professional I)* $110.00/HR Senior Technician (Technician IV)* $125.00/HR Technician III (Technician III)* $110.00/HR Technician II (Technician II)* $100.00/HR Technician I (Technician I)* $80.00/HR Licensed State Land Surveyor (Professional VI)* $200.00/HR Registered Professional Land Surveyor (Professional III)* $145.00/HR 4 -Man Survey Crew $170.00/HR 3 -Man Survey Crew $150.00/HR 2 -Man Survey Crew $130.00/HR 1 -Man Survey Crew $110.00/HR Construction Manager (Professional IV)* $150.00/HR Senior Field Construction Observer (Professional I)* $100.00/HR Field Construction Observer (Technician II)* $90.00/HR Utility Specialist (Professional II)* $130.00/HR Telecommunications Designer (Technician II)* $100.00/HR Telecommunications Fieldman (Technician I)* $80.00/HR GIS Manager (Professional III)* $150.00/HR GIS Analyst (Technician II)* $100.00/HR Right -of -Way Agent $115.00/HR Administrative $95.00/HR Clerical $70.00/HR GPS $35.00/HR/Receiver * Category labels 'Professional x' etc. are interim designations for 2015 and are to be implemented in lieu of previous position titles in 2016. ATTACHMENT B COBB, FENDLEY & ASSOCIATES, INC. 2015 REVISED STANDARD RATE SCHEDULE (Continued) SUBSURFACE UTILITY ENGINEERING One -Man Designating Crew (4 -Hour Minimum) $90/HR Two -Man Designating Crew (4 -Hour Minimum) $150/HR Vacuum Excavation Truck with 2 Technicians (Vac 3000 & 4000) (4 -Hour Minimum)$260/HR Vacuum Excavation Truck with 2 Technicians (Vac 6000) (4 -Hour Minimum) $280/HR Ground Penetrating Radar with 1 Technician (4 -Hour Minimum) $250/HR Traffic Control Officer @ Cost + 10% Traffic Control (Lane Closures, etc.) To Be Negotiated Permits (Local, State, etc.) @ Cost + 10% Designation & Traffic Control Vehicles $3.40/Mile Location Vehicles $6.80/Mile REIMBURSABLE EXPENSES Technology Fee (*) $3.75/HR Consultant or Specialty Contractor (Outside Firm) @ Cost + 10% Courier, Special Equipment Rental @ Cost + 10% Reasonable Out of Town Travel Expenses (Air. Hotel. Rental, etc.) @ Cost Mileage (Standard Car or Truck) IRS Approved Rate Per Diem for Out of Town Travel (Per Day/Person) $36/Day Title Plant Charges @ Cost + 10% Other Misc. Expenses Related to the Project @ Cost + 10% In -House Reproduction: Copies (Up to 11" x 17") $0.15/Each Color Prints (Up to 11" x 17") $1.50/Each Color Prints (Larger than 11" x 17") $3.00/Sq. Ft. Bluelines (All Sizes) $1.00/Each )► Bond Prints (All Sizes) $2.00/Each ➢ Mylar Prints $12.00/Each '.- Vellum Prints $9.00/Each (') Technology charges added to each billable man-hour. ATTACHMENT"C" EXHIBIT A PROGRAM MANAGEMENT SCOPE OF SERVICES FOR LOWER KIRBY DISTRICT DEVELOPMENT Design 1 of 1 1 D5. Revised 01/12 BASIC SERVICES: Program Manager(s) shall render the following professional services, as requested, to the OWNER in connection with the design and construction of the Project. 1. Pre-Construction/Design (on specific projects, as requested by the City/Owner) 1.1. Provide constructability review of plans, specifications, contract documents and validity of Engineer of Record's project duration. Identify construction issues, conflicts, review the design and independent verification of quantities. 1.2. Review of development plans, consultation and discussions with developers and engineers representing developers. 1.3. Consultation and representation of the City in matters with other entities such as state and federal agencies when requested to do so by the City. 1.4. Attend Pre -Bid Meeting; provide feedback to City's Project Manager as necessary, such as: tracking and recording questions for the Engineer's written response, clarifying the Owner's expectations for the project and the project execution. 1.5. Chair Pre -Construction Meeting 1.5.1. Schedule and conduct the pre -construction meeting; record and disseminate minutes from pre -construction meeting. 1.5.2. Utilize the City's Pro -Trak system: set communications protocol and contract administration procedures, establish progress meeting schedule and submittal schedule. Provide agenda for meeting: Key milestone dates. pay application procedures, schedule, public notification Ik,iai 2 of 11 1)5. Rcviscdl 01 12 issues and procedures, utility coordination issues, traffic control, permitting, property owner notification and coordination, temporary facilities, contractor's use of City's Pro -Trak system, etc. 2. Construction Administration and Management Services 2.1. Act as the City's on-site representative administering the contract for construction and providing overall project oversight, maintain record of decisions and changes made. 2.2. Meetings: Schedule and conduct construction progress meetings; record minutes from construction progress meetings and distribute via Pro -Trak to: City Representative, Design Engineer and contractor throughout the duration of the project. 2.2.1. Schedule meetings once a month, minimum, to review the following: work progress and schedule, outstanding issues, status of submittals and responses shop drawings unforeseen issues and changes to the work. 2.2.2. Coordinate additional meetings as necessary to discuss and resolve problems and provide guidance in a timely manner. 2.2.3. Coordinate/monitor the following: utility relocation activities for compliance, utility installation verification, reporting, record management and as -built drawings. 2.2.4. Attend all utility coordination, construction. and scheduling meetings. 2.2.5. Obtain copy of ROW permit and prints from Public Works in order to monitor progress of utility relocation per permit/plan. 2.3. Manage Construction 2.3.1. All final documentation is required in electronic/digital format, utilizing Pro -Trak as is feasible. Design of 1 1 D5. Re iced 01 12 2.3.2. As field problems arise, notify the Design Engineer and City Project Manager of proposed solutions to resolve problems. 2.3.3. Review and update as -built documents regularly with contractor. 2.3.4. Monitor and ensure adherence to approved project baseline schedule. Review contractor's schedule monthly, ensure compliance with City's intended schedule, and provide recommendations as needed to retain and regain schedule if needed. 2.3.5. Recommend alternate project sequencing/scheduling to keep project on schedule. 2.3.6. Prepare monthly summary report of construction activities with outstanding issues outlined for review. Monthly progress information associated with the project will be submitted to the Project Manager for review and approval. 2.3.7. Record weather conditions on jobsite daily. 2.4. Coordinate work of contractor with external agencies and utility companies. Coordinate contractor's operations with regard to other City contracts and construction as well as with property owners for planned service outages, street closures, and access control issues to properties including notifications. 2.4.1. Verify construction conformance and compliance with TCEQ, NOI and NOT. 2.4.2. Verify construction conformance with permitted activities such as: City of Pearland permits, U.S. Army Corps of Engineers permits, TxDOT roadway permits, and any Railroad agreements. 2.5. Maintain records of all decisions, actions and activities with regard to construction operations via the City's Pro -Trak system (i.e. Change Orders, RFIs and responses, Submittals and responses, Ihsicn 4 of 11 [)?. Re%ised 01 I' Request for Proposals, correspondence, SWPPP inspections.) 3. Construction Inspection Services 3.1. Provide full-time on-site technical observation of Contractor's activities to verify and ensure all work materials, structures, equipment and workmanship comply with the Contract Documents including Addenda, and Change Orders. Verify and ensure that Contractor maintains good construction practices, safety measures and professional standards prevailing in the local City, County, and State of Texas. Utilize City's Pro -Trak system for all inspection reports. 3.1.1. Notify the City Project Manager if Contractor's work is not in compliance with the Contract Documents, specifications or standard safety procedures. Notify the City Project Manager and Design Engineer of any failure of the Contractor to take measures to repair and bring work in compliance. 3.1.2. Issue Advisory Notices to Contractor for work or practices that are not in compliance with approved construction documents. 3.1.3. Issue Non -Compliance Reports to Contractor if non- conforming work is not brought into compliance or if plan of action to bring work into compliance is not conducted in timely manner. 3.1.4. Inspect and observe the materials and equipment being incorporated into the work to assure that they are handled, stored and installed in accordance with the Contract Documents and specifications. Report to the City Project Manager regarding these activities. 3.2. Identify, record and notify Design Engineer of any problems or failures to meet performance requirements in a timely manner to minimize delay in the progress of the project, make recommendation(s) for appropriate solution to the City Project Des! 2.!1 5 of I I D5. Revised 01/12 Manager and Design Engineer. 3.3. Prepare and maintain daily progress log or daily construction reports, photographs, records and track quantities installed that day utilizing the City's Pro -Trak system. 3.4. Ensure contractor reviews and approves daily reports and quantities and sign off on daily reports. 3.5. Verify contractor has obtained necessary permits and is maintaining any Traffic Control, public notification and Storm Water Pollution Prevention Plans, facilities, equipment or arrangements in accordance with contract documents. 3.6. Attend and participate in progress meetings. 3.7. Immediately notify the City Project Manager and Design Engineer in the event of an on-site accident. Record and note conditions, activities and witnesses to the event. 3.8. Maintain Resolution Log and respond to citizen complaints in Pro - Trak system. 3.9. Consult with City Project Manager and Design Engineer in advance of scheduled major work operations, tests, inspections or start of important phases of project. 4. Pay Applications 4.1. Pay applications will be generated by the City's Pro -Trak system based on quantities approved in the daily reports. Review and verify quantities provided by contractor for all work in compliance with contract documents. 4.1.1. Review work conducted daily on daily inspection reports and material installed measurements submitted by contractor; verify work conducted and bid item quantities via Pro -Trak; meet monthly to review pay estimate and quantities with contractor l)r:i_n 6 of 11 Revlu'd (I 12 4.1.2. Review progress pay application with Design Engineer for approval or revision prior to submittal to City. 4.1.3. Finalize pay application with signatures from Contractor, Engineer and Construction Manager certifying quantities and amounts via Pro -Trak. 4.1.4. Notify City Project Manager when all electronic signatures are completed in the Pro -Trak system for invoice processing. 4.1.5. Track and record requests for rain or other delays with potential to add to Contract Time in Daily Reports in Pro -Trak. 4.1.6. Provide an independent quantity forecast bid items to identify potential quantity over -runs as part of pay estimate review. 4.2. Upon completion of the work, prepare a final progress payment including a balancing change order zeroing out all unused quantities utilizing Pro -Trak. Identify and add additional quantities and make any approved changes to the Contract Time. 4.2.1. Review and coordinate with Design Engineer to provide Engineer's recommendation for Substantial Completion or Final Acceptance. (See Close-out Section) Design 7 of 1 1 D5. Revised 01/12 5. Document Control 5.1. Utilize the City's Pro -Trak system to: receive, route, track and log all Contractor communications, Submittals, Change Orders, RFIs, Pay Applications and Citizen Complaint/Resolution Log; communicate with Contractor the status of submittal reviews; review submittal and RFI log in Pro -Trak to ensure timely responses; notify City Project Manager, Contractor and Design Engineer of time critical issues. 5.1.1. Respond to RFIs when such response does not require the Engineer's opinion or expertise or direction from City. 5.1.2. Assemble and maintain notes, comments, sketches and supportive data relative to the Project to facilitate the revision of drawings to conform to the final as -built conditions. Review Contractor's record keeping periodically to ensure completeness, timeliness and progress. 6. Change Orders 6.1. Prepare and issue request for proposals in a timely manner via Pro - Trak. Review RFP and contractor proposal for additional work with City Project Manager and Design Engineer for approval. Ensure the status of RFP and Responses from Contractor, City and Design Engineer are logged and tracked in the Pro -Trak system. 6.2. Provide recommendation on technical matters as an advocate for the City. Evaluate Contractor's response/proposal for merit, cost, time, accuracy and price practicality. Negotiate with Contractor on City's behalf if required. 6.3. Prepare Change Order and documentation including signatures of Contractor, Engineer and Construction Manager for delivery to City. s of 11 D5. Revised 01/12 7. Testing Laboratory and Results 7.1. Coordinate testing laboratory activities with Contractor's activities. Review test reports for compliance with Contract Documents. Log, track and retain test reports in Pro -Trak. Review results with Contractor. Monitor any corrective action and re -testing for compliance. Maintain compliance with City's specifications 7.1.1. Review lab test reports and log any failures. 7.1.2. Review Invoicing from Laboratory to daily activities. 8. Project Completion and Close out 8.1.A. Provide list of deliverables for substantial completion walk through/inspection. Schedule and conduct project walk through upon receipt of Contractor's notification of substantial completion. Include City Project Manager, Design Engineer and others as directed. Prepare a list of non -conforming work based on visual inspections via Pro -Trak. Record and monitor contractor's corrective efforts and schedule. Schedule final completion inspection for any remaining corrections. B. Coordinate and obtain Design Engineer's signature and seal on Substantial Completion certificate and Final Completion and Acceptance certificate via Pro -Trak. 8.2 Review and compile any Operation and Maintenance documents required from the Contractor — forward to Engineer for review. Ensure Contractor's closeout documents are uploaded to Pro -Trak. Review for completeness and accuracy, including; affidavits of final payment, final pay estimates, as built records, redlines and drawings. Once received, notify the Design Engineer and City Project Manager when completed. I)c,icn (1 of I I D5. Revised 01/12 8.2.1. Upon completion of close out items, provide recommendation for City's Substantial Completion/Final Acceptance certificate. 8.2.2. Provide indexed project files, redline plans and as - built or record drawings to City via Pro -Trak. 8.3. Conduct Project Close -Out Meeting. 8.4. Prepare and recommend final payment application. (Prepare job record logs transmittals, and correspondence reports in an organized file for delivery to City.) 8.5. Consult with City on any potential Warranty items requiring repair or replacement. 9. Warranty Period 9.1. Schedule, arrange and coordinate a One Year Walk-through of the project to review status of the work 30 days prior to expiration of the One Year Maintenance period. 9.2. Provide staff to conduct and participate in the warranty inspections. 9.3. Prepare list of non conforming work for presentation to the City Project Manager, Design Engineer and Contractor via Pro -Trak. 9.4. Oversee repairs for non conforming work with Contractor. 9.5. Submit final report on completed warranty repairs via Pro -Trak. Design 1110 11 1)5. R.v ncd 01 12