Loading...
R-2016-002 2016-01-11RESOLUTION NO. R2016-2 A Resolution of the City Council of the City of Pearland, Texas, authorizing a contract for professional services associated with the Hughes Ranch Road West Water Line Project, with Brown and Gay Engineers, in the amount of $58,473.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract for professional services associated with the Hughes Ranch Road West Water Line Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract for professional services for associated with the Hughes Ranch Road West Water Line Project. PASSED, APPROVED and ADOPTED this the 11th day of January, A.D., 2016. ATTEST: APPROVED AS TO FORM: • GL DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR V; �'' ••F. i Resolution No. R2016-2 Exhibit "A" CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is entered into upon final execution by and between the City of Pearland ("CITY") and Brown & Gav Eneineers ("CONSULTANT"). The CITY engages the CONSULTANT to perform professional services for a project known and described as Huehes Ranch Rd West 12 inch Water Line Improvements (from CR 94 to Cullen Parkway) ("PROJECT"). (Project #WA1602) SECTION I - SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A. The CONSULTANT shall perform design and construction phase services. See Exhibit A, attached, for a detailed SCOPE OF WORK and PROJECT schedule. The PROJECT schedule shall be submitted in digital and hard copy form in the Microsoft Project for Windows format. B. The CONSULTANT shall prepare and submit a detailed opinion of estimated cost of the PROJECT. C. The CONSULTANT acknowledges that the CITY (through its employee handbook) considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the CITY. The CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY employee to engage in such misconduct. D. The CONSULTANT shall submit all final construction documents in both hard copy and electronic format. Plans shall be AutoCAD compatible and all other documents shall be Microsoft Office compatible. The software version used shall be compatible to current CITY standards. Other support documents, for example, structural calculations, drainage reports and geotechnical reports, shall be submitted in hard copy only. All Record Drawings electronic files shall be submitted to the CITY in TIF format. E. The CONSULTANT recognizes that all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. Design I of6 Dl. Revised 1/14 F. The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non -owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in limits ("Change in Coverage") except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT, CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT'S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. Design 2 of6 DI. Revised 1/14 G. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the CONSULTANT, his officers, employees, agents, or subcontractors under this CONTRACT. H. All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. SECTION II - PERIOD OF SERVICE This CONTRACT will be binding upon execution and end 10 months after the Notice to Proceed is issued. SECTION III - CONSULTANT'S COMPENSATION A. The total compensation for the services performed shall not exceed the total noted in Section B. 13. The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT based upon the following: 1. Preliminary and Final Design Phases (Lump Sum) $36,451.00 2. TCP (Lump Sum): $7,316.00 3. Bid Phase Services (Hourly Not to Exceed) $2,960.00 4. Construction Phase Services (Hourly Not to Exceed) $10,575.00 5. Reimbursable Expenses (Not to Exceed) $1,171.00 6. Total: $58,473.00 C. The CITY shall make payments to the CONSULTANT within thirty (30) days after receipt and approval of a detailed invoice. Invoices shall be submitted on a monthly basis. Design 3 of6 DI. Revised 1/14 SECTION IV - THE CITY'S RESPONSIBILITIES A. The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B. The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize delay in the progress of the CONSULTANT'S work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of the work. The CONSULTANT agrees that the CITY'S inspection, review, acceptance or approval of CONSULTANT'S work shall not relieve CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or its sub-consultant(s) or in any way affect the CONSULTANT'S status as an independent contractor of the CITY. SECTION V - TERMINATION A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason - - with or without cause -- by delivering written notice to CONSULTANT personally or by certified mail at 10777 Westheimer, suite 400, Houston, Texas 77042. Immediately after receiving such written notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials supplied by the CITY on or before the 15th day following termination of the CONTRACT. C. In the event of such termination, the CONSULTANT shall be paid for services performed prior to receipt of the written notice of termination. The CITY shall make final payment within sixty (60) days after the CONSULTANT has delivered to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D. If the remuneration scheduled under this contract is based upon a fixed fee or definitely ascertainable sum, the portion of such sum payable shall be proportionate to the percentage of services completed by the CONSULTANT based upon the scope of work. Design 4 of6 DI. Revised 1/14 E. In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. F. If the CITY terminates this CONTRACT for cause and/or if the CONSULTANT breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney's fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under this CONTRACT. To accomplish this, the parties agree to mediation as follows: if a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. SECTION VI — ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. SECTION VII — COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability, and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent fee that has been paid. Design 5 of6 DI. Revised 1/14 SECTION VIII- SUCCESSORS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. CIF PE LAND, TEXAS Clay Pea son City Ma ager SULTAN'` �Ttw. �� thso January 11, 2016 DATE l2 �2i IS DA E Design 6 of6 D1. Revised 1/14 FfiAl BROWN & GAY ENGINEERS December 18, 2015 Ms. Andrea Brinkley City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Re: WA1602: Hughes Ranch Rd West 12 inch Water Line Improvements (from CR94 to Cullen Parkway) Dear Ms. Brinkley: We are pleased to submit this proposal to provide professional engineering services for preliminary design, final design and construction phase services for the proposed water line improvement along Hughes Ranch Road. BACKGROUND INFORMATION The City of Pearland (the "City") has acquired water line facilities through annexation of Southdown Subdivision and areas in the vicinity. It is the City's desire to make water line improvements, which included extending and upsizing the water line, prior to beginning roadway widening work along Hughes Ranch Road. The water line improvements will create a continuous water line, improving service by connecting existing water lines acquired through annexation. SCOPE OF SERVICES A scope of services has been discussed with the City and is attached as Exhibit A. Brown & Gay Engineers ("BGE") will perform design and construction phase services. Geotechnical borings were performed under separate contract for the roadway improvements; thus, geotechnical services are not included in this fee proposal. The Scope of Services is based on the following tasks being performed by the City: 1. Provide waterline size. 2. Obtain the required Right -of -Way and/or easement for the proposed water line. FEES The total fee of these services is proposed as $58,473. The Preliminary and Final Design Phases will be invoiced on a lump sum basis. The Bid Phase and Construction Phase Services will be invoiced on an hourly not to exceed basis. A breakdown of the fee is included as Exhibit B. Serving. Leading. Solving' 10777 Westheimer 1 Suite 400 1 Houston, Texas 77042 1281-558-8700 Ms. Andrea Brinkley City of Pearland December 18, 2015 Page 2 SCHEDULE BGE will begin work upon receipt of the City's Notice to Proceed. A schedule for the project is attached as Exhibit D. We look forward to assisting the City on this project. Should you have any questions, please give me a call. Sincerely, 944‘,171Jim Johnson, PE Sr. Project Manager EXHIBIT A UTILITIES SCOPE OF SERVICES FOR Hughes Ranch Road West 12 Inch Water Line Improvements WA 1602 Design 1 of 5 D10. Revised 12/11 Modified 6/05 BASIC SERVICES: The Consultant shall render the following professional engineering services to the OWNER in connection with the construction of the Project. Preliminary Design Phase Services 1. Data Collection a) Attend Design Kick -Off meeting with City. i. Review City informational resources and make arrangements to obtain these. ii. Discuss objectives of project and adjacent projects. b) Procure such additional data as required through other services and/or sub consultants. c) Survey (topo) info i. Same datum will be used from Hughes Ranch Road (CR 403) Design Update project (Project #TR1201). ii. Utilize the topographic information from Hughes Ranch Road project to develop plan and profiles sheets. d) No Geotechnical service be perform under this contract. The geotechnical information will be obtain from Project #TR1201. e) Environmental is not included. 2. Prepare and Submit 30% level documents consisting of, but not limited to: a) Proposed construction methodology and materials. b) Cost estimate with 15% contingency. c) 30% Plans consisting of Plan & Profile Topographic Survey from Hughes Ranch Road with parcel data along the proposed water line alignment and connection points. Water line alignment will extend as follows: i. Smith Ranch Rd to South Hampton. ii. North Hampton to Sterling Ln. iii. Linda Ln to Cullen Parkway. Design 2 of 5 D10. Revised 12/11 Modified 6/05 d) Review, consolidate and prepare written response to City's review committee. Prepare traffic control plans meeting City of Pearland criteria a) Initial traffic control plans shall be submitted at the 60% submittal. b) Traffic control plans shall be prepared using City of Pearland's criteria. TxDOT review and approval effort is not included and is not anticipated for this project. c) Plans shall generally consist of one lane closure during working hours, with detours. Design Phase Services 1. Prepare Construction Plans and Specifications 2. Cost Estimates a) Submit for review detailed construction plans at 60% & 90% (along with specifications form at 60% - include bid form & completed "front end documents" at 90%). b) Submit 60% & 90% plans to Utility companies and coordinate work for relocation or service changes, if required. c) Coordinate with external regulatory and permitting agencies, including but not limited to TCEQ, TXDOT, Brazoria DD #4 & Harris County Flood Control & USACE (US Army Corp of Engineers). d) Provide Traffic Control plan and SWP3 plans and specifications, if required. e) Submit plans for City Engineer's signature. f) Prepare bid sets for distribution via the City's e -bid system. Bid Phase Services 1. Bid Phase Services a) Provide Notice to Bidders (NTB) and list of bid items to the Project Manager in an electronic form appropriate for the e -bid system format. City is responsible for advertising. Design 3 of 5 D10. Revised 12/11 Modified 6/05 b) Provide electronic copy of bid -ready plans to the Project Manager for the e -bid system. c) Chair pre-bid meeting and attend Bid Opening d) Respond in writing to questions from bidders and prepare addenda, coordinate with Project Manager as necessary. e) Assist with design of Bid Proposal* f) Prepare Engineer's Recommendation of Award Letter that includes the following required content: i. Check for math errors and reconcile any mathematical discrepancies ii. Review for unbalance bid items iii. Certified Bid Tabulation including Engineer's estimate iv. Review of contractor's financial standing and references provided v. Explanation of discrepancies between the Engineer's estimate and bids vi. Recommendation to award 2. Attend City Council meeting and recommendation for award of Contract for Construction. 3. Produce and transmit to selected contractor five (5) sets of plans and project manuals in hard copy, and one electronic format copy to Project Manager, in a format ready for execution with City's Notice of Intent to Award (NOI). *This is the use of bid strategies to attain lowest possible prices for work, use of alternatives, etc. Construction Phase Services 1. Construction Phase Services a) Construction Administration i. Attend pre -construction meeting to provide information & answer questions Design 4 of 5 D10. Revised 12/11 Modified 6/05 ii. Attend monthly progress meetings with Construction Manager, Contractor & City of Pearland iii. Review & comment on Construction's submittals, RFIs, RCOs including coordination with Construction Manager on Change Directives & Change Orders using the City of Pearland's Pro Trak system iv. Review & approve monthly pay applications coordinating with Construction Manager using the City of Pearland's Pro Trak system v. Provide interpretive guidance for Contractor, Construction Manager in resolution of problems vi. Coordinate with Construction Manager to review progress of work for Substantial Completion; with production of punch list; substantiation that items are completed; and issue both Certificate of Substantial Completion & Final Acceptance vii. Issue letter to City recommending acceptance & release of final payment viii. Coordinate contracts, CM/CI to provide complete record of As- Builts ix. Provide Record Drawings from Contractor's As-Builts in electronic format (CD) & hard copy format Definition: 1) As-Builts "redlines": Contractor's record of field changes to the work in line, grade & elevation 2) Record Drawings: Engineer's incorporation of contractor's As-Builts Design 5 of 5 1)10. Revised 12/11 Modified 6/05 Task EXHIBIT B SUMMARY OF FEE Pearland - Hughes Ranch Road Water Line Improvements CIP Project WA 1602 Compensation Hourly Not to Lump Sum 1 Exceed TCP 30% Design $14,030 $CI Surveylsee breakdown below) ST $0 Final Design (includes 60%, AO% 100% submittals) Bid Phase Construction Phase Services Expenses $7,316 $3Z161$0 $O) $22,421 $61 $(� $50 1 $G $110,552.75 $� $356 Total - Project Survey Survey (Design survey ) (obtain from Hughes Ranch Rd project) (Abstracting 1 Total Add Services [(None) IBGE Markup (Total Total $21,666' $0 $22,921 $2,960 $10,925 $36.461 $13.51 1 $7,31 1 $117 1 558,473 50 Sol 501 Pearland - Hughes Ranch Road Water Line Improvements CIP Project WA 1602 30% Design Total Linear Feet : 5,320 LF Project Management Pf i Initiation / Kick-off Meetin • HC, FC, DD4 Subm P A Re its Subcon -nan 30%Deslgn Site Visit Research Utilities & Prepare Base Maps Cover Sheet n( q Index &I. Pd Sheet Survey Proiect Senior Stall Graduate CADD Admin Principal Manager Engineer Engineer Engineer Technician Assistant *189 $163 $146 $120 $87 $98 $0 1 4 4 2 0 0 0 0 sQu T�W iSStli�RSt 1"=40' (6 Sheets)Water o Respond 10 C4 b /� ��g�nts (� 2 A(A S r Ranch Road survey information 1 an ha Traffic Control Plans Traffic Control Sheets (2 sheets) Deie I JAl R Revv' / Ap 6 s 1. J1! 1111 Cost 2 4 0 0 0 0 0 0 0 4 4 1 0 0 0 4 2 2 0 3 8 1 2 6 8 4 1 4 0 0 *650 O 1 $641 O 0 *889 O 0 S889 O 0 *325 Subtotal *3.395 0 0 *798 1 0 $1.055 2 0 15 4 0 29 12 0 $2.473 20 0 $3,817 O 0 $625 O 0 5120 O 0 $804 Subtotal $10,635 1 111111 11111111 r1 1 I1111111IIIIIIi111111I11 : i :,1 .1 .1 _..illi. .. llaneffiteittaffil $0 $0 *0 Subtotal i0 1 1: 1 1 1 1: LL .:11 ;i 11)111. 1 0 16 0 16 0 *4,125 O 8 0 8 0 $2,062 O 4 0 0 0 $1129 Subtotal $'1,316 . ! 1 .1 , 1 11.: I hid : 111 11Y :: 1 5100 $221 Subtotal 5321 :,: 11 11. 1I,: I11I 1111 1 1 : ii 1 1 .1 1 til 1 1:111 11 1.11111111111 111 111 I111 I1 I..1 i. II►I 1 !11111Ii11dI 1:11 11,1h I 1 i :Ii: il..11 lull: 1 III11 11:uI 1 Pearland - Hughes Ranch Road Water Line Improvemeir2s CIP Project WA 1602 Final Design Services + Bid Phase Total Linear Feet: 5,320 LF Project Management P :,, Initiation / Kickoff Meeting Coordination Month r ` `• "ec t ReviewS 8nt 60% Design Submittal Cover Sheet Draw42 Index & Lam gnd Sheet Ove(L((1J.,��2]j� ShMt3 MitUM Atib\iment and Profile (6 Sheets) Cons i QC review 90% Design Submittal I t Geo -tech Bokri Locations UAW I he -off & CosTE!Uhtate Comments from 60% COP + Utilities nApprovals i3it structabillty & QC review 100% Design Submittal Incorporate comments and design modifications Project Stnior Staff Graduate CAD° Admin Print pal Marager Engineer Engineer Engineer Technician Assistant 5189 5163 $146 $120 587 $98 50 O 0 0 0 4 4 o o o 0 0 0 0 O 0 1 2 1 2 4 1 6 6 1 6 10 Revise Cost Estimate & Qty Take -off U rr a - tions 'WPPP 1 0 O 0 1 1 2 6 1 2 1 1 4 4 ie 0 0 0 1 1 0 0 btotal 1 6 Subtotal $1,235 0 598 O 5217 O $1,44�9�1 0 5'1.538 8 $2,237 O $309 Subtotal $11.787 8 0 2 0 5217 51.758 $1.953 5548 $3,345 1 0 ]1 ?2 A0 5477 O 5363 1 1 1 1 5428 o o 0 0 0 $0 Q o 0 0 0so Subtotal 51,289 Bid Phase Support Pr/7,re e -bid documents to City 1 t i Pre -Bid Meetinyi 2 Pr to Addendum 1 � r� tih {���+ � a sis F t pki1JLdr)tfACtV �9h It award 2 II III Expenses Reproduction Cost Delivenes .l�I!tI!!Jl iiLl[ l!.Iti11INA iE9lbdi.ilin&iiitti&Eislle...,.dn 1,11! 141.111.1 1 0 0 $282 0 0 0 $618 1 0 2 $282 2 $�C7� 28 1 6'/ Slbbtal 52.960 i!!-944 '+.040:41+ r !ellektkI etW4tvpolut#i f W` 4,Mit,. 5250 Subtotal Eli a LIIth I M I 1 I II IA Mid, I J li IO ,f Y,116 /.4LL1. r 11113'ill ;17 1 IN11 141L.aliii114141i4 i,i Yt.iiA aki.i. ii.1.46- rd611 L id Pearland - Hughes Ranch Road Water Line Improvements CIP Project WA 1602 Construction Phase Services (6 Months Construction Duration) Project Admin. & Management Project Managemert Project Senior Staff Graduate CADD Admin Principal Manager I ngineer Engineer Fngineer Technician Assistant $189 $163 $146 $120 $87 $98 $0 0 0 0 0 0 SO Construction Engineering and Administration Pre -Construction Meeting 3 0 3 0 0 $846 'INV min 0 0 18 0 0 $2.154 Silo V151 sy Reports 0 4 18 0 10 $2,739 RFI Re n/rse 0 1 10 0 2 $1.343 rSubbmd (lf kfffeview� t'� 0 4 1 0 0 $705 rjprtlon nsp 04 4 2 0 0 0 0 ,064 $824 ��yt 0 0 1 8 0 $900 Subtotal $10,575 Expenses Construction (�S)7 jF p $0 iPfi/njl[;tn/t Cost 50 Jeage j 5 np x 10 trips) $350 Subtotal $350 Pearland - Hughes Ranch Road Water Line Improvements Preliminary Probable Construction Cost Item 12" PVC waterline by Open Cut 12" PVC waterline by Auger 2" Gate Valves w/Box 12" Wet Connection Fire Hydrants 6" leads Re-establish Landscape Filter Fabric Fence Trench Safety System Traffic Control Quantity Unit 5,120 LF) 200 L� 54 E 6 EJ 6Eejt 75 LF 14,222 S 5,120 LF 5,12(5 LF 14 EA Unit Cost $85.00 $180.00 $3,500.00 $1,500.0(5 $2,200.00 $20.00 $0.75 $1.25 $1.50 $15,000.00. Sub -total Contingency (20%) TOTAL Total Cost 435,200.001 V36,000.001 $17,500.001 $6,000.00 $13,200.00 $1,500.00 $10,666.67 $6,400.00 $7,680.00 $15,000.001 $549,146.67 $109,829.33 $658,976.00 1 a n..... Cts .•.l.D... 23 F104311 Mann, m R.oWi OE. 36 3160,211.460/01.41.6 3/ 20 CONSTRUCI1ON PHASE 23 NTP 80 Car111224142 81 111131011111110010011401 32 Find 140 days Pd awn. F8 W7I1 8C0620 FE MHO .,y. M r Ler. 30 dr FR 12/27 12/2011 1731 I 1/17 1/31 71 Exhibit D City of Peariand Hughes Ranch Road Water Line Improvements Mm>w 1 NFe t , [. t Lu I t august t t t iVo.«M.r t ab« 1 14 I 2/t& 1 173& 1 1;7 1 u10 1 4);14.1 se I 11/8 1 Y10I m I Int I m1 1 MA 1 yie l lit 1 0y I taa 1 Tugs ttb L110)b."1 t2/. Pro).at 20181200_551.404 Jav2. oro 0251 Dart.: Tom 126/18 1.52041020 6ummry Tw 1]15111 • • Nape Summary r-. IMtft. &many M.ru.l 362 37/42/ • Et0.11. r..... s External 76.101 5100/1 TNR 0 82314nly PlM••• • 5452101 /211•3100. • Dur.Oarnorty F.1WrroNy 1211.ston. --- - 1 Mnud 8umm.y Rohe ♦ 61M1.I Tab . •