R-2015-221 2016-01-11RESOLUTION NO. R2015-221 A Resolution of the City Council of the City of Pearland, Texas, approving a change order with Crain Group, LLC in the amount of $450,712.00 associated with the Sports Complex at Shadow Creek Ranch Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order associated with the Sports Complex at Shadow Creek Ranch Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes. is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the change order associated with the Sports Complex at Shadow Creek Ranch Project. PASSED, APPROVED and ADOPTED this the 11'" day of January, A.D., 2016. TOM REID MAYOR ATTEST: APPROVED AS TO FORM DARRIN M. COKER CITY ATTORNEY Exhibit A GRAIN carxir Change Order Request #14 - Site Electrical Quantity Overruns - REV #7 Resolution No. R2015-221 Exhibit "A" 116/2016 PROJECT: City of Pearland Sports Complex 13050 Shadow Creek Parkway Pearland . Tx 77584 Project No: P20002 DESCRIPTION QTY UNIT RATE ITEM TOTAL DIVISION TOTAL Line Item #49 "Trenching" (Overrun) 4036 LF $15.44 $62.315.84 Line Items "Conduit and Wire" (Correct Qty) see attached see attached $652.631.58 Deduct Original Line Item #50 "Conduit and Wire" 15000 LF $20.00 -$300,000.00 Contractor's OH&P (5%) 1 LS $32,631.58 $32.631.58 Performance and Payment Bond 1 LS $3.133.00 $3.133.00 $450,712.00 Grand Total $450,712.00 QUALIFICATIONS: 1 Change Order Request based on quantity overruns from the bid form and actual quantities required. 2 The project schedule has been effected by since October 30. 2015. APPROVED BY: DATE: Exhibit A 7 SOOStir Elects iccil Services Change Order Request — 120515 — 1(Revision 3) Prepared by: Ronnie Boegler Job Name: City of Pcarland Sports Complex Contractor - POC: Crain Group — John Green Date: 12/17/15 SGG Electrical Services was asked to estimate the conduit and wire by size with real quantities to come up with price change. Wire Size LF Wire Conduit Labor Total #2 2075 $14,442.00 $2,478.00 $16,807.50 $33,727.50 #3 5495 $30,332.40 $6,534.00 $44,509.50 $81,375.90 #4 15585 $69,197.40 $18,510.00 $126,238.50 $213,945.90 116 9549 $27,501.12 $ 11,302.80 $77,346.90 $116,150.82 118 6586 $12,249.96 $7,723.20 $53,346.60 $73,319.76 #10 1522 $1,826.40 $1,754.40 $ 12,328.20 $15,909.00 #12 724 $651.60 $820.80 $5,864.40 $7,336.80 350kcmil 200 $31,536.00 $496.80 $1,620.00 $33,652.80 5001(cmil 560 $58,346.40 $1,676.70 $4,536.00 $64,559.10 Wire "Total 42296 $246,083.28 $51,296.70 $342,597.60 $639,977.58 Conduit Only 2850 $3,420.00 $9,234.00 $12,654.00 Grand Total 1. Conduit/Wire (Line Item #50) • Total from Drawings +$652,631.58 • Minus Contract Amount ($270.000.0Ln • Change Order Amount +$382,631.58 $652,631.58 4501 Dixie Farm Rd, Suite100 Pearland, TX 77581 1 P 281-648-2177 F: 281-648-2577 Exhibit A The changes above will result in a price change of 1-$382,631.58 Please sign and fax this form to 281-648-2577 Date: Customer Signature: Printed Name: 4501 Dixie Farm Rd, Suite100 Pearland, TX 77581 1 P: 281-648-2177 F: 281-648-2577 8 Exhibit A y Takeoff Summary FIELD LIGHTING From To Wire (LF) Wire Size it of Wire Conduit (LF) Conduit Size Field 1 Circuits HSL1 Al 981 4 4 971 1.5 HSL1 A2 999 4 4 989 1.5 HSL1 B1 1107 3 4 1097 1.5 HSL1 B2 1133 3 4 1123 1.5 HSL1 Cl 1399 4 4 1389 1.5 HSL1 C2 1440 4 4 1430 1.5 Field 2 Circuits tISL1 A2 999 4 4 989 1.5 HSL1 A3 918 6 4 908 1.5 11511 B3 1130 3 4 1120 1.5 HSL1 B4 797 4 4 787 1.5 HSL1 C3 1165 4 4 1155 1.5 HSL1 C4 872 6 4 862 1.5 Field 3 Circuits HSL1 A3 918 6 4 908 1.5 HSL1 A4 782 6 4 772 1.5 HSL1 B5 785 4 4 775 1.5 HSL1 B6 660 4 4 650 1.5 HSL1 C5 489 8 4 479 1.5 Hal C6 337 10 4 327 1.5 Field 4 Circuits HSL1 Al 981 4 4 971 1.5 HSL1 A4 782 6 4 772 1.5 HSL1 B7 643 4 4 633 1.5 IISL1 B8 1085 3 4 1075 1.5 HSL1 C7 681 6 4 671 1.5 HSL1 C8 991 4 4 981 1.5 Field 5 Circuits HLS2 AS 447 8 4 437 1.5 HLS2 A6 402 8 4 392 1.5 HLS2 B9 542 6 4 532 1.5 HLS2 B10 508 6 4 498 1.5 HLS2 C7 681 6 4 671 1.5 HLS2 C9 810 6 4 800 1.5 Field 6 Circuits HLS2 A6 402 8 4 392 1.5 HLS2 A7 251 10 4 241 1.5 HLS2 B10 508 8 4 498 1.5 HLS2 611 194 12 4 184 1.5 HLS2 C6 33/ 10 4 327 1.5 HLS2 C10 144 12 4 134 1 5 Exhibit A 10 Field 7 Circuits HLS2 A7 251 10 4 241 1.5 HLS2 A8 397 8 4 387 1.5 HLS2 B11 194 12 4 184 1.5 11152 B12 495 8 4 485 1.5 HLS2 C11 192 12 4 182 1.5 HLS2 C12 399 8 4 389 1.5 Field 8 Circuits HLS2 A5 447 8 4 437 1.5 HLS2 A8 397 8 4 387 1.5 HLS2 B9 542 8 4 532 1.5 HLS2 B12 495 8 4 485 1.5 HLS2 C13 670 6 4 660 1.5 HLS2 C14 892 6 4 _ 882 1.5 Total LF Wire: 32671 Total LF Conduit: 32191 SITE POWER CIRCUITS Takeoff (IF) Wire Size It of Wire Conduit (LF) Conduit Size LS -1,3 1040 3 4 1030 1.5 LS -5,7 515 4 4 505 1.5 LS -8 1026 4 4 1016 1.5 LS -6 904 4 4 894 1.5 LS -10 493 6 4 483 1.5 LS -12 240 8 4 230 1.5 HP -8 183 10 4 173 1.5 HP -10,12 163 10 4 153 1.5 HP -14,16,18 453 8 4 443 1.5 HSL1A-38,40,42 1300 4 4 1290 1.5 HSL2- 37,39,41 473 8 4 463 1.5 HSL2- 79 2075 2 4 2065 1.5 Total (LF) Wire: 8865 Total LF Conduit: 8745 Secondary Circuits Takeoff (LF) Wire Size # of Wire Conduit (LF) Conduit Size XFMR Pav 560 500 10 540 4 (2 sets) XFMR Rack 200 350 20 160 4 (4 sets) Total (LF) Wire: 760 Total LF Conduit: 700 Exhibit A Additional Conduit Conduit Only Size & Quantity IF Note: 8 2" x 2 EA 720 Note 9: 3" x 3 EA 714 Note: 10 4" x 2 EA & 2" x 1EA 1416 Total (IF) Conduit: 2850 11 Exhibit A 12 TECHN "SURETY ICALBONDPROFESASSURANCE January 6, 2016 RE: Pearland, Sports Complex @ Shadow Ck To Whom it May Concern: The additional premium for Crain Group, LLC on the Pearland, Sports Complex @ Shadow Ck project is $3,133.00. This price is based on an original contract amount of $6,569,579.00 and a potential increase in contract of $447,579.00 to equal a new total contract price of $7,017,154.00. Should you have any questions, please give us a call. Best Regards, TECHNICAL ASSURANCE, L.L.C. \.JCJ Erica Cox Account Manager Phone: 281.296.9997 • Fax: 281.296.9998 • 26623 Oak Ridge Drive • The Woodlands, TX 77380