R-2015-180 2015-10-12RESOLUTION NO. R2015-180 A Resolution of the City Council of the City of Pearland, Texas, approving a change order with Crain Group, LLC in the amount of $834,620.75 associated with the Sports Complex at Shadow Creek Ranch Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order associated with the Sports Complex at Shadow Creek Ranch Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the change order associated with the Sports Complex at Shadow Creek Ranch Project. PASSED. APPROVED and ADOPTED this the 12th day of October. A.D.. 2015. TOM REID MAYOR ATTEST: APPROVED AS TO FORM DARRIN M. COKER CITY ATTORNEY RESOLUTION NO. R2015-180 Exhibit "A" CHANGE ORDER Sports Complex at Shadow Creek Ranch CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpearland.com/projects Date of Issuance: 10/12/2015 Change Order No.: Contractor: Crain Group CoP Project No.: Consultant: Cobb Fendley & Associates Inc P.O. No.: 6 P20002 142421 Explanation: This change order encompasses the following: A change order to add scope to Crain Group's current contract. Items to be added include the lawn amphitheater, volleyball courts. clearing and grubbing of phase 2 areas, concrete walking trail. and ballfield number 8. These items were removed from the contract during competitive sealed proposal negotiations due to funding constraints Description of Work 1 Revise the Quantity from 46 to 55 75 on Bid Item No 23 00. "Clearing and Grubbing" 2 Revise the Quantity from 6 to 8 on Bid Item No.63 00. "Bleachers" 3 Add Item No 99.00, "Concrete walking trail around the pond" 4 Add Item No 100 00. "Irrigation for field 8. complete in place" 5 Add Item No. 101.00, "Fencing, field 8" 6 Add Item No 102.00. "Dugouts" 7 Add Item No. 103 00. "Retaining Wall" 8 Add Item No. 104.00, "Import soils, preparation, and fine grading" 9 Add Item No. 105.00, "Sod - TX Turf Grass" 10 Add Item No 106.00. "Hydromulch. Amphitheater" 11 Add Item No 107 00. "Retaining Wall, Amphitheater" 12 Add Item No. 108.00. "Volleyball Court, complete in place" 13 Add Item No 109 00, "Bonds & Insurance. Additional Scope" 14 Add Item No. 110.00, "Contractor Fee" Please attach back-up documentation. Cost Time $ 129,285.00 $ 13.600 00 $ 210.429 00 $ 12.000 00 $ 42,972.00 S 31,256.00 S 32,700 00 $ 85,204 00 $ 37.410 00 52.00000 $ 53.595 00 $ 74,799 00 S 71,064.00 $ 38.306 75 Cost & Time Change Summary Cost Original Contract $ 6.569.575.96 Previous Change Order(s) $ 18 716.13 Contract prior to this Change Order $ 6.588.292 09 Net increase (decrease) from this Change Order $ 834.620 75 Revised Contract: $ 7.422,912.84 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days Time 300 Days 58 Days 358 Days 127 Days 485 Days Admin 1 of 3 6 Revised 7.25'08 CHANGE ORDER Sports Complex at Shadow Creek Ranch CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpearland com/projects Date of Issuance: 10/12/2015 Change Order No.: Contractor: Crain Group CoP Project No.: Consultant: Cobb Fendley & Associates. Inc P.O. No.: Finance Approval RECOMMENDED: By: elft.{ � Date 10/16/2015 Consultant ACCEPTED*: By Date 10/19/2015 Contractor RECOMMENDED: 6 P20002 142421 Date By: 'GLAn--1-W.J 'D Date By Construction Manager APPROVED: Owner 10/12/2015 10/16/2015 Date 10/26/2015 'Contractor agrees to perform change(s) included in the Change Order for the price and time indicated The prices for changes included all costs associated with this Change Order No work is to be done until this change order is executed No payment to the Contract (or Consultant) shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent, this Change Order governs Upon execution by all partes. the following changes identifies for the contract value and/or contract time shown are made part of the contract Admin 2 of 3 6. Revised 7/25!08 PROJECT: Sports Complex at Shadow Creek Ranch CHANGE ORDER NO. 6 ATTACHMENT"A" PROJECT NO.: October 12, 2015 142421 ITEM ORIGINAL CONTRACT REVISED CONTRACT DESCRIPTION UNIT QTY UNIT COST TOTAL QTY UNIT COST TOTA NET CHANGE ADJUSTED CONTRACT QUANTITY: LARGE BALL FIELDS 63.00 Bleachers ON-SITE STORM ITEMS 23.00 Clearing and Grubbing EA 6 56.800.00 540.800.00 8 554,400.00 513,600.00 AC 46 $13,260.00 $609,960.00 55.75 5739,245.00 5129,285.00 ADD ITEM(S) TO CONTRACT: AMPHITHEATER 106.00 Hydromulch. Amphitheater AC 107.00 Retaining Wall, LF Amphitheater BALLFIELD IRRIGATION 100.00 Irrigation for field 8. LS complete in place BONDS & INSURANCE 109.00 Bonds & Insurance, LS Additional Scope CONTRACTOR FEE 110.00 Contractor Fee LS 0.5 $4,000.00 52.000.00 $2,000.00 300 $178.65 $53,595.00 $53,595.00 1 512,000.00 512.000 00 512,000.00 1 571,064.00 571,064.00 571,064.00 1 538,306.75 $38,306.75 538,306.75 LARGE BALL FIELDS 101.00 Fencing, field 8 LF 1,200 $35.81 542,972.00 542,972.00 102.00 Dugouts EA 2 515,628.00 531,256.00 531,256.00 103.00 Retaining Wall LF 150 5218.00 532,700.00 532,700.00 104.00 Import soils, preparation, LS 1 585,204.00 $85,204.00 585,204.00 and fine grading 105.00 Sod - TX Turf Grass LS 1 537,410.00 $37,410.00 $37,410.00 ON-SITE PAVING 99.00 Concrete walking trail SF 40,860 55.15 5210.429.00 5210,429.00 around the pond VOLLEYBALL COURT 108.00 Volleyball Court, complete EA 3 524.933 00 $74,799.00 $74,799.00 in place Admin NET TOTAL CHANGE ORDER #6: 5834,620.75 ORIGINAL CONTRACT AMOUNT: $6,588,292.09 CHANGE ORDER #6: $834,620.75 REVISED CONTRACT AMOUNT: $7,422,912.84 3 of 3 6. Revised 7125/08 <<8„ JJ9IHX3 Cow ty1. awe ub.h .0411. WNW W lee IN AV her If *ft M Tel. AFF RC: {1.02 \ •1 \ 1 R C..LG.,. Pnnl •• 01 MASTER SITE PLAN her4,1_ - 9ea KJ•E r.Ka, muK MIRY T.OM. Mc ro r., m ,o ••.t. ,at .150 Ptt 1000 011 011100.0 JN . 0.0 •••,I•1, 1. • • • MICR. Cu. WOWS . I.-0, 0•ICI6t0.O TO 0 CYO C.6 OWNS bat TO.. )RCC a1 COV•t(; ..A %060. r.b110 1T.O • MI C. •••••••• FON •./.0 M O: OM 000..6 RM Ntr. I0.1 00.0111 a•.tt 20] GENERAL NOTES Scop q PFAFF... Y01a0 0A 1. CargM.•••O.g.P•6 Pond 2 CO CO NIb0. P. Ura NRiR.R•n. •••••••NTIINNTY.: *NNW COPT MCI _ 001T1OST ^ • Taw 0. y Mt 00 ▪ M1d9CR000 1RIC4 1 •.G . R..tTO.MOM Oft. 03.1.005...00. Ta▪ m▪ s r P�.i. •••••••51.0. • rwwo..•-r.a.•. 11 0.0.1 A 6 . b. b• • Y... •••••• ...a op • oa..P...nwim� • .ng ON OMB . xrlCR.n(C1wP.rieaii R r...r• il4t-ri.�lnii 051 CODE ANALYSIS t•11OP08E0 NEW WORTS COMPtu P00 ttE CITY OF MARIANO SHADOW CREEK RANCH P•FM 22)4 zakbliSPOICY PP r4-100 wW�R.r- O. 1 Om.. MAD 10. 1100,.. JOON° O *- JOONO IWARM DATE 27, 3014 uDP SNEIT NO A1.01 VASTY PI SITE PLAN „0„ 1191HXD Shadow Creek Ranch Sports Complex Activity Name OD RD 1 Activity Start Finish 2015 2016 Sep 1 Oct 1 Nov 1 Dec Jan j Feb 1 Mar 1 Apr 1 May 1 Jun 1 Jul 1 Aug Project Closeout Final Project Acceptance by City 1 1 0% 28 -Jan -16 28 -Jan -16 Project Delays Survey Delay - Recover Property Corr 16 0 100% 26-Aua-1... 11 -Seo -1... TX Dot Permit -Delay 77 0 100% 11 -Nov -1... 27 -Jan -15 A Location of Center.oint Transformer F 86 0 100% 11 -Feb -15 A 02 -Seo -1... Sitework Notice to Proceed 0 0 100% 25-Aua-1... 25-Aua-1... Clear/Grub and Balance Site 55 6 90% 25-Aua-1... 01 -Oct -15 Access Road 20 0 100% 09 -Feb -15 A 26 -Feb -15 A Paving 40 0 100% 11 -Feb -15 A 17-ADr-15 A Main SW/Retaining Walls/Plaza Areas 60 24 60% 09 -Jun -15 A 27 -Oct -15 Site Utilities (Storm, Water, Sanitary) Storm Sewer 60 0 100% 01 -Oct -14 A 23 -Jan -15 A Site Sanitary 40 0 100% 27 -Oct -14 A 23 -Jan -15 A Site Water 20 0 100% 01 -Dec -1... 23 -Jan -15 A Pavilion Install Building Pad Install Plumbing Underground Install Building Foundation Building Delivery Steel Erection Install Masonry Partitions MEP Trim Out Install Finishes Site Electrical Electrical Ball Fields 5 0 100% 27 -Jan -15 A 04 -Feb -15 A 10 0 100% 04 -Feb -15 A 11 -Feb -15 A 10 0 100% 19 -Feb -15 A 28 -Feb -15 A 1 0 100% 18 -Mar -15 A 19 -Mar -15 A 15 0 100% 18 -Mar -15 A 17-Aor-15 A 20 0 100% 04-Aua-1... 31-Aua-1... 15 15 0% 06 -Oct -15' 26 -Oct -15 20 20 0% 27 -Oct -15 23 -Nov -15 40 30 25% 09 -Mar -15 A 04 -Nov -15 1 Final Project Acceptance by City Location of Centerpoint Transformer Pad Clear;Grub and Balance Site Main SW/Retaining Walls/Plaza Areas Install Masonry Partitions MEP Trim Out Install Finishes Electrical Remaining Level of Effort Actual Level of Effort Tertiary Ba... Actual Work ('rain (;roup. 1..1 .C. Shadow Creek Ranch Sports Complex Date Revision Checked Approved 24 -Sep... Revised Schedule Shadow Creek Ranch Sports Complex Activity Name OD RD Activity _omotete Start Finish 2015 2016 Sep 1 Oct J Nov [ Dec Jan Feb [ Mar t Apr 1 May 1 Jun t Jul 1 Aug Irrigation Fencing Topsoil / Reddog Sodding Extra Work Items Clearing and Grubbing Rough Grade Field Amphitheater Retaining Wall Volleyball Court Irrigation Backstop Retaining Wall Jogging Trail Amphitheater Hydromulch Dugouts Fencing and Dugout Erection Final Grade Soil and Sod Project Closeout Complete City Punchlist Complete Close Out Documents Substantial Completion Project Delays Rain Day Rain Day Rain Day Rain Dav Rain Dav Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day 30 18 40% 25-Auo-1... 19 -Oct -15 30 21 30% 25 -Aug -1... 22 -Oct -15 29 29 0% 24 -Seo -1... 18 -Nov -15 21 21 0% 10 -Nov -15 10 -Dec -15 15 15 0% 13 -Oct -15' 7 7 0% 13 -Oct -15' 10 10 0% 13 -Oct -15' 30 30 0% 13 -Oct -15' 10 10 0% 22 -Oct -15 10 10 0% 22 -Oct -15 30 30 0% 27 -Oct -15 5 5 0% 27 -Oct -15 10 10 0% 05 -Nov -15 15 15 0% 19 -Nov -15 15 15 0% 11 -Dec -15 20 20 20 20 0 0 02 -Nov -15 21 -Oct -15 26 -Oct -15 23 -Nov -15 04 -Nov -15 _ 04 -Nov -15 09 -Dec -15 02 -Nov -15 18 -Nov -15 11 -Dec -15 31 -Dec -15 0% 24 -Nov -15 23 -Dec -15 0% 31 -Dec -15 27 -Jan -16 0% 31 -Dec -15 31 -Dec -15 1 0 100% 27-Aua-1... 1 0 100% 29-Aua-1... 1 0 100% 06 -Seo -1... 2 0 100% 16 -Seo -1... 3 0 100% 18 -Seo -1... 2 0 100% 22 -Seo -1... 4 0 100% 03 -Oct -14 A 3 0 100% 14 -Oct -14 A 2 0 100% 05 -Nov -1... 1 0 100% 13 -Nov -1... _3 0 100% 17 -Nov -1... _1 0 100% 21 -Nov -1... 3 0 100% 24 -Nov -1... 1 0 100% 01 -Dec -1... 27-Aua-1... 29-Aua-1... 06 -Seo -1... 17 -Seo -1... 20 -Seo -1... 23 -Seo -1... 07 -Oct -14 A 16 -Oct -14 A 06 -Nov -1... 13 -Nov -1... 19 -Nov -1... 21 -Nov -1... 26 -Nov -1... 01 -Dec -1... Irrigation Fencing Topsoil / Reddog Sodding Clearing and Grubbing Rough Grade Field mi Amphitheater Retaining Wall Volleyball Court mo Irrigation um Backstop Retaining Wall Jogging Trail • Amphitheater Hydromulch •• Dugouts 1 Fencing and Dugout Erection Final Grade Soil and Sod Complete City Punchlist Complete Close Out Documents I Substantial Completion Remaining Level of Effort Actual Level of Effort Tertiary Ba... Actual Work (rain Group. I..I..(' Shadow Creek Ranch Sports C'omple\ Date Revision Checked Approved 24 -Sep Revised Schedule Shadow Creek Ranch Sports Complex Activity Name Rain Dav Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day Rain Day OD RD Activity Start Finish :omolete 1 0 100% 05 -Dec -1... 05 -Dec -1... 2 0 100% 18 -Dec -1... 19 -Dec -1... 2 0 100% 22 -Dec -1... 23 -Dec -1... 2 0 100% 26 -Dec -1... 27 -Dec -1... 3 0 100% 29 -Dec -1... 31 -Dec -1... 2 0 100% 01 -Jan -15 A 02 -Jan -15 A 1 0 100% 03 -Jan -15 A 03 -Jan -15 A 1 0 100% 05 -Jan -15 A 05 -Jan -15 A 2 0 100% 09 -Jan -15 A 10 -Jan -15 A 1 0 100% 12 -Jan -15 A 12 -Jan -15 A 4 0 100% 13 -Jan -15 A 16 -Jan -15 A 2 0 100% 22 -Jan -15 A 23 -Jan -15 A 1 0 100% 28 -Jan -15 A 28 -Jan -15 A 1 0 100% 04 -Feb -15 A 04 -Feb -15 A 2 0 100% 16 -Feb -15 A 17 -Feb -15 A 1 0 100% 02 -Mar -15 A 02 -Mar -15 A 1 0 100% 05 -Mar -15 A 05 -Mar -15 A 6 0 100% 09 -Mar -15 A 14 -Mar -15 A 3 0 100% 16 -Mar -15 A 18 -Mar -15 A 1 0 100% 21 -Mar -15 A 21 -Mar -15 A 1 0 100% 23 -Mar -15 A 23 -Mar -15 A 2 0 100% 25 -Mar -15 A 26 -Mar -15 A 1 0 100% 11-Aor-15 A 11-Aor-15 A 6 0 100% 13-Aor-15 A 18-Aor-15 A 1 0 100% 25-Aor-15 A 25-Aor-15 A 1 0 100% 27-Aor-15 A 27-Aor-15 A 2 0 100% 13-Mav-1... 14-Mav-1... 6 0 100% 18-Mav-1... 23-Mav-1... 6 0 100% 25-Mav-1... 30-Mav-1... 1 0 100% 13 -Jun -15 A 13 -Jun -15 A 4 0 100% 15 -Jun -15 A 18 -Jun -15 A 1 0 100% 02 -Jul -15 A 02 -Jul -15 A 4 0 100% 19-Aua-1... 22-Aua-1... 1 0 100% 25-Aua-1... 25-Aua-1... 2015 2016 Sep 1 Oct 1. Nov 1 Dec Jan l Feb Mar I Apr 1 May 1 Jun I Jul 1 Aug .ain Day Rain Day Remaining Level of Effort Actual Level of Effort Tertiary Ba... Actual Work ('ram Group. 1..1..('. Shadow Creek Ranch Sports Complex Date Revision Checked Approved 24 -Sep Revised Schedule „a„ 1I9IHXD RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Memo To: From: Cara Davis, Project Manager Clay Pearson. City Manager CC: Jon Branson, Deputy City Manager Trent Epperson, Assistant City Mana Susan Polka, City Engineer Skipper Jones, Assistant Projec : Director Chris Orlea, Interim Parks Dir tor Date: September 10, 2015 9/10/2015 To: Mayor and City Council members Furher update on park construction progress. Clay RE: Sports Complex at Shadow Creek Ranch — Construction Update This memo provides an update on the Sports Complex at Shadow Creek Ranch construction project and planned activities. The last memo was dated May 28, 2015. Construction Update Work continues on the pavilion building as well as the ballfields and plazas. The restroom/concession building construction has begun under the pavilion. Final grades on fields 1-7 are being reached and irrigation is being installed. Final grading of the detention ponds and the remainder of the site is also in progress. Installation of sidewalks and plazas between the fields continues. Pedestrian lighting will be installed by MUSCO Sports Lighting once walkways and plazas between fields have been completed. Agreements have been signed with Centerpoint for power to the park and installation of the overhead service poles has been completed. We are continuing to work with Centerpoint Major Underground to finalize the agreement for the underground portion of the service which includes setting our pad mounted transformer. Despite the lack of a final agreement, we have held the underground electric pre -construction meeting with the Centerpoint representative and have been cleared to begin construction on our portion of the infrastructure. Reliable Traffic Signal has relocated the power service for the traffic signal at Trinity Bay and Shadow Creek Parkway. Reddico Construction Co. was contracted to perform the bore across Kingsley in order to tie in the water service at the park to the existing water line on the east side of Kingsley. They have completed this work. Kinder Morgan has also begun installation of the 3 inch gas pipeline that runs adjacent to the park along Kingsley. The traffic signal contract was let in June. A contract was entered into with Traftex, Inc. in July and they have since begun work. The foundation and pull box for the new signal have been installed at the southwest corner of the intersection. Some conduit has also been placed for the 1� Sept 10. 2015 Sports Complex at Shadow Creek Ranch Construction Update age Page 1 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE signal across the Trinity Bay driveway as well as across FM 2234. Poles and mast arms are on order. Summary of activities: • Detention pond excavation is 87% complete • Restroom/concession building walls are up. Plumbing is being installed. Overhead area is being constructed. • Driveway connection to Shadow Creek Parkway (FM 2234) has not been installed. SBC needs to make adjustments to their facilities in order for this work to be accomplished. Their parts are on order and this work should be complete in the next few weeks. • Electrician continues to run power conduit across the site to the fields. Will begin runs to the pavilion and restroom buildings. Will also be installing underground service infrastructure. • Ballfield irrigation is going in. Once power and water are established and irrigation is complete. turf will be installed. • Traffic signal installation has begun. Three Month Look Ahead: • Complete detention pond excavations. • Complete electrical work. • Final grade fields/site and install sod/hydromulch. • Rework stabilization and subgrade at driveway connection to Shadow Creek Parkway entrance and install driveway. • Complete walkways and plaza's between fields. • Complete installation of the traffic signal modifications at Trinity Bay intersection. • Continue to coordinate with Kinder Morgan pipeline installation along Kingsley Dr. • Complete tie in to water service connection across Kingsley. Test lines and put them into service. • Finalize underground agreement with Centerpoint Energy and complete site power installation. • Complete items added back to the project scope via MUD Funds received (see "Other Items of Interest" below) • Take contract for Kompan, Inc.to Council on September 141h for installation of playground equipment. Issue NTP and complete the installation. • Prepare for Grand Opening in January 2016. Schedule The contract includes 300 calendar days for substantial completion with an additional 30 days to achieve final completion. Our contract also allows for 40 Rain Days per year to be built into each construction contract. The length of this contract allows for 36 rain days to be built into the schedule, at which time days over this amount will be added to the contract time as an extension. The 36 day threshold was reached on December 31, 2014. So far a total of 57 days through the month of June have been approved and added to the contract via change order. An additional six (6) days are pending approval for the months of July and August. Sept 10, 2015 21 Page Sports Complex at Shadow Creek Ranch Construction Update Page 2 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Schedule: Notice to Proceed with Construction Original Anticipated Substantial Completion Date Adjusted Anticipated Substantial Completion Date Other Items of Interest August 25, 2014 June 21, 2015 (300 calendar days) August 23, 2015 (324 calendar days) The second Interlocal Agreement between the City and Boards for BCMUD's 1 and 26 went before Council on June 8, 2015. This agreement provided an additional $685,000 from each organization to supplement the funding for water, sewer and drainage items related to construction of the park facilities. The priorities of amenities to be added back with the $1.37 million contribution per the interlocal is as follows: • Crushed granite trail around detention pond • Clear and grubbing Ph 2 open space • Playground • Lawn Amphitheater • Volleyball courts • Maintenance Building • 4'h lighted softball field • Scoreboards for softball fields. The playground equipment contract has been negotiated with Kompan, Inc. and is planned to be purchased via the U.S Communities government purchasing alliance pending approval by Council at the September 14' Council meeting. The maintenance building will be repackaged and advertised for bids in late September. Staff is currently in negotiations with the general contractor, Crain Group, to add the trail. phase 2 clearing/grubbing, amphitheater, volleyball courts. and remaining softball field to their scope of work. If negotiations are successful. a Change Order will be presented for City Council consideration. which will add the work to the current construction contract. If there are sufficient funds remaining, we will enter into a contract with MUSCO Sports Lighting to light the 8`h field. Sept 10. 2015 3 Sports Complex at Shadow Creek Ranch Construction Update Page 3 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Photos log t'i gisiW��ri�aHil Sept 10. 2015 View from Kingsley entrance. Sports Complex at Shadow Creek Ranch Construction Update Page 4 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Vie Sept 10 2015 Dumpster enclosure with field lighting in the background. 51 Sports Complex at Shadow Creek Ranch Construction Update Page 5 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE -110 Yiyv>rr.- •7=, -.. • Sept 10, 2015 Pavilion with restroom/concession building from the east parking lot 61 Sports Complex at Shadow Creek Ranch Construction Update Page 6 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE View from southwest of the restroom/concession buidling. Concession windows are visible. Sept 10, 2015 71 Page Sports Complex at Shadow Creek Ranch Construction Update Page 7 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE r•P'" l•-•r.oe -411r • • 04F •C*. • • •AV. -• - • itt-X• - • - -es • . • • • I- . - . . - „ . -it - Sept 10, 2015 Front view of concession area. Wage Sports Complex at Shadow Creek Ranch Construction Update Page 8 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Sept 10, 2015 Interior of concessions area. 91 Page Sports Complex at Shadow Creek Ranch Construction Update Page 9 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Sept 10, 2015 View from west drive of Trinity Bay entrance. Pavilion in the background. 10IPage Sports Complex at Shadow Creek Ranch Construction Update Page 10 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Memo To: Clay Pearson. City Manager From: Cara Davis. Project Manager CC: Jon Branson, Deputy City Manager Trent Epperson, Assistant City Manager Skipper Jones, Assistant Projects Director Michelle Graham, Parks Director Date: May 28. 2015 5/28/2015 To: Mayor and City Council members Long-awaited progress in the ground for s Sports complex at Shadow Creek Ranch. Clay RE: Sports Complex at Shadow Creek Ranch — Construction Update This memo provides an update on the Sports Complex at Shadow Creek Ranch construction project and planned activities. The last memo was dated February 19, 2015. Construction Update Detention pond excavation is almost complete. Driveway and parking lot paving is complete with the exception of the driveway tie in at Trinity Bay. The City contracted with Reliable Traffic Signal to relocate the power service for the traffic signal at Trinity Bay and Shadow Creek Parkway. The pavilion has been erected and work will begin shorty on the restroom and concession buildings. Coordination efforts continue with CenterPoint Energy to finalize the design. agreements and schedule for site power. Power access location, overhead power routing into the park and terminal pole/transformer pad location have been determined. City Council recently granted an easement to Kinder Morgan for a new 3 inch gas pipeline adjacent to the park along the Kingsley ROW. Related work will be coordinated with park construction. MUSCO has installed precast concrete foundations and high mast sports lighting for softball fields. Pedestrian lighting will be installed once walkways between fields and plazas have been constructed. Summary of activities: • Detention pond excavation is 85% complete • The metal building of the pavilion as well as the roof has been erected and installed. • Paving for entrances from Kingsley and Shadow Creek Parkway as well as parking lot paving is complete. Driveway connection to Shadow Creek Parkway has not been installed. • Sports lighting has been installed on the fields • Electrician has begun installation of power conduit across the site. Sept 10. 2015 11 Page Sports Complex at Shadow Creek Ranch Construction Update Page 11 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Three Month Look Ahead: • Complete detention pond excavations. • Electrical work at the pavilion and fields to continue • Final grade fields and install sod/hydromulch. • Complete stabilization and subgrade as well as driveway connection to Shadow Creek Parkway entrance. • Complete walkways and plaza's between fields. • Complete traffic signal power switchover to the new service panel at Trinity Bay intersection. • Coordinate with Kinder Morgan pipeline installation along Kingsley Dr. • Install bore under Kingsley for water service connection to service line on the east side of Kingsley. • Finalize agreements with Centerpoint Energy and install site power. Schedule The contract includes 300 calendar days for substantial completion with an additional 30 days to achieve final completion. Our contract also allows for 40 Rain Days per year to be built into each construction contract. The length of this contract allows for 36 rain days to be built into the schedule, at which time days over this amount will be added to the contract time as an extension. The 36 day threshold was reached on January 10, 2015. So far a total of 24 days through the month of March have been approved and will be added to the contract via change order. An additional nine (9) days are pending approval for the month of April. Schedule: Notice to Proceed with Construction Original Anticipated Substantial Completion Date Adjusted Anticipated Substantial Completion Date Other Items of Interest August 25. 2014 June 21, 2015 (300 calendar days) July 15, 2015 (324 calendar days) Due to funding issues, several items were removed from the original proposed contract to include: • Crushed Granite Trail • Scoreboards • Lawn Amphitheater • Maintenance Building • Volleyball Courts • Playground • Clear & Grub Ph 11 • Crushed Stone Road • Extra 1 -year Tree Maintenance • Sub Concrete for Granite Trail. Other items were modified or value engineered to reach the negotiated contract value. The Boards for BCMUD's 1 and 26 offered the City $685,000 from each organization ( a total of $1,370,000) to supplement the funding for water. sewer and drainage items related to construction of the Park facilities. On November 10, 2014. Council approved entering into an Interlocal Agreement with MUD's 1 and 26. Sept 10. 2015 21 age Sports Complex at Shadow Creek Ranch Construction Update Page 12 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE On May 1, 2015 the City received notice that TCEQ approved the BCMUD.s to use these funds to construct infrastructure for the park. A second Interlocal Agreement is scheduled to go before Council on June 8. 2015 which will clarify the City's obligation regarding the use of the funds and prioritizes the amenities to be added back into the project, including: • Crushed granite trail around detention pond • Clear and grubbing Ph 2 open space • Playground • Lawn Amphitheater • Volleyball courts • Maintenance Building • 4'h lighted softball field • Scoreboards for softball fields. The current construction contract is scheduled for substantial completion within the next three months. The softball field. volleyball courts and clearing and grubbing may be change ordered into the existing construction contract. Staff plan to re -package the lawn amphitheater, maintenance building and crushed granite trail for new bids and separate contracts. The Playground equipment, lighting for the softball field and the scoreboards will be procured via the Buyboard as appropriate. Items installed under these separate contracts will not be complete at the time of substantial completion of the current contract. The City also applied for a $400,000 grant from Texas Parks and Wildlife in August 2014. Multiple requests for additional information were received by the City from TPWD, and the project was classified by the process as a Category 4, which includes projects with several adverse impacts and/or unclear elements. The final disposition of the grant was that our request was not approved. Photos Sept 10, 2015 3I Sports Complex at Shadow Creek Ranch Construction Update Page 13 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Metal Building of Pavilion has been erected. Sept 10, 2015 Pavilion as seen from east parking lot 41Pat; Sports Complex at Shadow Creek Ranch Construction Update Page 14 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE High mast sports lighting as seen from east parking lot. • Sept 10, 2015 High mast sports lighting. 5 Page Sports Complex at Shadow Creek Ranch Construction Update Page 15 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Sept 10. 2015 Pavilion and lighting as seen from near the Kinglsey entrance. 61 Sports Complex at Shadow Creek Ranch Construction Update Page 16 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Memo To: Mayor & City Council From: Jon R. Branson Date: February 26, 2015 Subject: Shadow Creek Ranch Sports To: Clay Pearson, City Manager Complex Update From: Andrea Brinkley, Project Manager CC: Jon Branson, Deputy City Manager Trent Epperson, Assistant City Manager Skipper Jones, Assistant Projects Director Date: February 19, 2015 RE: Sports Complex at Shadow Creek Ranch — Construction Update This memo provides an update on the Sports Complex at Shadow Creek Ranch construction project and planned activities. The last memo was dated December 10, 2014. Construction Update Progress had been made on detention pond excavation, site work paving and the pavilion building. The TxDOT permit for the Trinity Bay Dr. entrance was obtained which will allow work at Trinity Bay Dr and FM 2234 to proceed. Coordination efforts continue with CenterPoint Energy regarding location and schedule of site power. The City was recently notified that Kinder Morgan would like to acquire an easement along Kingsley Dr for a new 3 in. pipeline, and related work will be coordinated. Summary of activities: • Detention pond excavation is 85% complete • The pavilion building plumbing and piping has been installed and has passed inspection. • Underground storm sewer drainage installation is completed. • Installation of the 8" water line and sanitary sewer system are complete • Lime stabilization for the project is approximately 45% completed, with the central and eastern parking lots and eastern roadway towards on Kingsley Dr. complete. • Concrete was placed on western parking lot on Thursday February 18tH Three Month Look Ahead: • Electrical work at the pavilion and fields to commence • Complete lime stabilization of western parking lot and western section of roadway leading to Trinity Bay entrance • Complete paving of eastern roadway towards Kingsley Dr. entrance and central and west parking lots and western roadway and Trinity Bay Dr. entrance. • Complete relocation of traffic signal power panel at Trinity Bay intersection. Sept 10, 2015 11 Page Sports Complex at Shadow Creek Ranch Construction Update Page 17 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE • Coordinate with Kinder Morgan pipeline installation along Kingsley Dr. Schedule Roadway Schedule: Notice to Proceed with Construction Anticipated Substantial Completion Photos: August 25, 2014 June 2015 (300 work days) Pond excavation in January 2015. Sept 10, 2015 West Parking lot forms and rebar installation complete. Sports Complex at Shadow Creek Ranch Construction Update 21 Page Page 18 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE West parking lot concrete placement. Sept 10, 2015 Plumbing piping installed at pavilion. 31 Page Sports Complex at Shadow Creek Ranch Construction Update Page 19