Loading...
R-2015-178 2015-10-12RESOLUTION NO. R2015-178 A Resolution of the City Council of the City of Pearland, Texas, authorizing an amended engineering service agreement with CDM Smith, Inc., for engineering services associated with the Reflection Bay Water Reclamation Facility Expansion Project, in the amount of $120,630.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amended contract for engineering services, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an amended contract for engineering services associated with the Reflection Bay Water Reclamation Facility Expansion Project. PASSED, APPROVED and ADOPTED this the 12th day of October, A.D., 2015. ATTEST: NG L G, T, Y SEC ETARY APPROVED AS TO FORM. 6L_ DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR RESOLUTION NO. R2015-178 Exhibit "A" CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive. Suite 300 Pearland. TX 77581 www.cityofpearland com/proiects Professional Services Contract Amendment FNW WWTP Expansion Date of Issuance: 10/12/2015 Consultant: CDM Smith Amendment No.: CoP Project No.: P.O. No.: 4 WW1405 142418 Explanation: This change order encompasses the following: This Amendment encompasses additional design engineering services related to two components the Ultraviolet Disinfection and the Building Materials. The first component of additional work is related to the change in Ultraviolet Disinfection system equipment. The initial design contract was based on the re -use of the existing UltraTech Ultra Violet Disinfection equipment and power distribution and controls. and the addition of new modules with the same equipment The existing system has lacked reliability and manufacturer maintenance support has been poor Based on this, the City has requested the engineer to change to a more reliable manufacturer with a system that could be designed and used in the existing Ultraviolet Disinfection facility. This change provides for the addition of an Aquaray 40H0 Ozonia system. and associated design engineering work such as revisions to the channel layouts, modifications to the demolition plans, and revision of electrical design, SCADA connections and new control panel and revising the control and plant hydraulics design sheets and design specifications for this new system. The cost for the additional design engineering for the change in the Ultraviolet Disinfection system design is $50,500.00 The second component of additional work is related to a design revision of the building materials for three new buildings required for the expansion the Non -Potable Water Electrical/Chemical building. Influent Lift Station Electrical building and Blower/Electrical building The initial design contract was based on a block building design with a pier foundation. When costs were evaluated, the cost of the foundations and buildings were reviewed for possible cost savings and alternate building materials and foundations. The engineer proposed a precast concrete panel building design that provides for cost savings in the building material and foundation but requires a re -design effort The cost for the additional design engineering for the change in building materials to a precast concrete building system is $70.130.00, and the net expected savings is $480,000 in construction costs Description of Work Revise the quantity from 1 to 1.056580675422138835 on Item No 1 1 Final Design (Lump Sum) Please attach back-up documentation. Cost & Time Change Summary Original Contract Previous Amendment(s): Contract prior to this Amendment: Net increase (decrease) from this Amendment Revised Contract: Cost Time $ 120,630.00 0 Days Cost $ 4,162,000.00 $ 246.000.00 $ 4.408,000.00 $ 120,630.00 $ 4,528.630.00 Time 0 Days 0 Days 0 Days 0 Days 0 Days Des gr 1 of 2 D4 Revised 708 Date of Issuance: Consultant: Finance Approval: ACCEPTED*: By CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpearland.com/projects Professional Services Contract Amendment FNW WWTP Expansion 10/12/2015 CDM Smith Amendment No.: CoP Project No.: P.O. No.: Consultant Date 10/15/2015 APPROVED: 4 WW1405 142418 Date 10/20/2015 By: �w� Date 10/15/2015 Project Manager By: Date Owner 10/19/2015 'Consultant agrees to perform change(s) included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties, the following changes Identifies for the contract value and/or contract time shown, are made part of the Design 2 c' 2 D4. Revised 7/08