Loading...
R-2015-220 2015-12-07RESOLUTION NO. R2015-220 A Resolution of the City Council of the City of Pearland, Texas, approving a contract amendment with QC Laboratories, Inc., associated with the Sports Complex at Shadow Creek Ranch Project., in the amount of $13,600.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract amendment associated with the Sports Complex at Shadow Creek Ranch Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the amended contract associated with the Sports Complex at Shadow Creek Ranch Project. PASSED, APPROVED and ADOPTED this the 7th day of December, A.D., 2015. ATTEST: APPROVED AS TO FORM: Qa„: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR 111111 • 07...:411.10 •.• °' =31 ��— �\ Exhibit A Resolution No. R2015-220 LABORATORIES, INC. Engineering and Testing Services November 13, 2015 Ms. Cara Davis City of Pearland Projects Group 3519 Liberty Drive Pearland, TX 77581 Reference: Construction Material Testing Services Shadow Creek Ranch Sports Complex FM 2234, Pearland, Texas QCL Fee Schedule No.: 24199-A Dear Ms. Davis: QC Laboratories, Inc. (QCL) is requesting a change order in the amount of $13,600.00 to cover Material Testing Services provide by QCL on the above detailed project. The original QCL Contract amount for this project was $42,400.00. The total fee for Materials Testing Services to date conducted on this site is $53,000.00. We anticipate that an additional $3,000 for Material Testing Services will be needed to complete this project. Therefore, QCL is requesting that the contract amount be increased to $56,000.00. We appreciate the opportunity to be of service to the City of Pearland. Sincerely, QC Laboratories, Inc. Bob Copus, P.G., CAPM TDSHS IAC 10-5445 10810 Northwest Freeway, Houston, Texas 77092 Tel: 713-695-11331 Fax: 713-695-0808 www.gclabs.com aLABORATORIES, INC. Date: 3/27/2014 Client: City of Pearland Project Name: Shadow Creek Ranch Sports Complex QCL Proposal No: 24199-A 10810 Northwest Freeway Houston, TX 77092 Tel: 713-695-1133 Fax: 713-695-0808 Untt Unit Service Cost Basis No. Extension Site Utilities / Soil Fill / Subgrade Inspection Engineering Technician $ 45.00 Hour 184 8,280 Engineering Technician - OT $ 67.50 Hour 36 2,430 Vehicle Charge $ 55.00 Trip 27 1,485 Density Gauge Rental $ 60.00 Trip 27 1,620 Moisture/Density Relationship (ASTM 0-698 Method A) $ 175.00 Each 9 1,575 Moisture/Density Relationship (Stabilized) $ 185.00 Each 4 740 Optimum Lime Determination by pH Method $ 195.00 Each 4 780 Atterberg Limits (ASTM 0-4318) $ 65.00 Each 13 845 Minus #200 Sieve Analysis (ASTM C-1140) $ 45.00 Each 9 405 Compressive Strength Cement Stabilized Sand $ 50.00 Each 4 200 Subtotal 18,360 Drilled Pier - Installation Inspection Engineering Technician $ 45.00 Hour 0 0 Engineering Technician - OT $ 67.50 Hour 0 0 Vehicle Charge $ 55.00 Trip 0 0 Compressive Strength Test (ASTM C-39) $ 16.00 Each 0 0 Subtotal 0 Concrete Pier Caps / Grade Beams / Slabs and Paving Concrete Mix design Review for ACI Compliance $ 85.00 Each 0 0 Engineering Technician $ 45.00 Hour 327 14,715 Engineering Technician - OT $ 67.50 Hour 72 4,860 Vehicle Charge $ 55.00 Trip 83 4,565 Compressive Strength Test (ASTM C-39) $ 16.00 Each 232 3,712 Subtotal 27,852 Structural Masonry Engineering Technician $ 45.00 Hour 55 2,475 Engineering Technician - OT $ 67.50 Hour 7 473 Vehicle Charge $ 55.00 Trip 12 660 Compressive Strength Mortar Cubes (ASTM C-109) $ 16.50 Each 36 594 Grout Prisms (ASTM C-1019) $ 35.00 Each 24 840 Subtotal 5,042 Structural Steel Visual Welding Inspector $ 65.00 Hour 4 260 Visual Welding Inspector - OT $ 97.50 Hour 0 0 Level II Ultrasonic Technician $ 95.00 Hour 0 0 Level II Ultrasonic Technician - OT $ 142.50 Hour 0 0 Ultrasonic Test Equipment $ 55.00 Trip 0 0 Ultrasonic Test Consumable Supplies $ 30.00 Quart 0 0 Vehicle Charge $ 55.00 Trip 1 55 Subtotal 315 Project Management Project Management $ 75.00 Hour 19 1.425 Project Manager - Project Site Visits $ 75.00 Hour 0 0 Project Manager - Vehicle $ 55.00 Trip 0 0 Subtotal 1 425 TOTAL COST ESTIMATE $ 53,000 This total cost estimate is based on the information currently available concerning the service scope and estimated construction schedule. Services will be invoiced based on the actual units provided above.