Loading...
R-2015-232 2015-12-14RESOLUTION NO. R2015-232 A Resolution of the City Council of the City of Pearland, Texas, authorizing the City Manager or his designee to enter into a contract with Halff Associated, in the amount of $106,575.00 for engineering services associated with the joint City of Pearland/Brazoria Drainage District No. 4 Master Drainage Plan Project Phase I. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract for engineering services associated with the joint City of Pearland/Brazoria Drainage District No. 4 Master Drainage Plan Project Phase I, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract for engineering services associated with the joint City of Pearland/Brazoria Drainage District No. 4 Master Drainage Plan Project Phase I. PASSED, APPROVED and ADOPTED this the 14th day of December, A.D., 2015. ATTEST: TOM REID MAYOR %/Q 2 APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Exhibit A Resolution No. R2015-232 MEMORANDUM OF UNDERSTANDING This Memorandum of Understanding (`MOU"), made and entered into by and between the City of Pearland, a home rule municipality incorporated under the laws of the State of Texas, hereinafter ("City"), and Brazoria Drainage District No.4, a body corporate and politic under the laws of the State of Texas, hereinafter ("District"); RECITALS Whereas, the City and District understand the importance of developing a comprehensive Master Drainage Plan to develop and guide future drainage policies and improvements in their respective jurisdictions; and Whereas, the City and District desire to utilize the same consultant to develop a Master Drainage Plan that will be used by both entities in implementing drainage policies; and Whereas, the City and District desire to set forth desire an MOU to set forth their respective responsibilities with regard to the Master Drainage Plan; and WITNESSETH NOW THEREFORE, in consideration of the mutual covenants, agreements and benefits to the parties herein named, it is hereby agreed as follows: I. Responsibilities of the Parties A. The City and District agree to select an engineer that will prepare a scope of services to develop Master Drainage Plan to serve as a drainage policy implementation tool for both entities. B. Upon selection of an engineer, City and District shall separately contract with the engineer to develop the Master Drainage Plan, and each party shall be responsible for 50% of the total costs associated with preparation of the Master Drainage Plan. C. City and District agree to present the final version Master Drainage Plan to their respective governing bodies for approval and adoption. II. CURRENT FUNDS AVAILABLE Both parties hereto represent that they have appropriated sufficient funds to satisfy their respective obligations under this Agreement. III. MISCELLANEOUS A. City and District recognize and agree that City, in performance of this MOU, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. B. City and District recognize and agree that the District, in performance of this MOU, shall act as an independent contractor and shall have control of its own work and the mariner in which it is performed. C. City and District shall comply with all applicable laws, regulations and requirements in performance of their respective obligations under this MOU. D. City and District recognize and agree that nothing herein shall be construed to create any rights in third parties. E. City and District agree that no party shall have the right to seek indemnification or contribution from any other party hereto for any losses, costs, expenses, or damages directly or indirectly arising, in whole or part form this MOU. Each person signing below represents that he or she has read this MOU in its entirety, including any and all attachments and exhibits, understands its terms, is duly authorized to execute this MOU on behalf of the party indicated by his or her name below and agrees on behalf of said party that the party will be bound by these terms. SIGNED and ENTEREDis 5 th day of January , 2016. BRAZORIA DRAINAGE DISTRICT No.4 Mike Yost, Superintendent ATTES // Kimbe ey WooJ:4 1, Director of Admin Servi•es CITY OF PEARLAND earson, Cit S' Manager Exhibit B CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is entered into upon final execution by and between the City of Pearland ("CITY") and Halff Associates, Inc. ("CONSULTANT"). The CITY engages the CONSULTANT to perform professional services for a project known and described as City of Pearland & Brazoria Drainage District No. 4 Master Drainage Plan ("PROJECT"). SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A. The CONSULTANT shall prepare a drainage master plan. See Exhibit A, attached, for a detailed SCOPE OF WORK and PROJECT schedule. The PROJECT schedule shall be submitted in digital and hard copy form in the Microsoft Project for Windows format. B. The CONSULTANT shall prepare and submit a detailed opinion of estimated cost of the PROJECT. C. The CONSULTANT acknowledges that the CITY (through its employee handbook) considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the CITY. The CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY employee to engage in such misconduct. D. The CONSULTANT shall submit all final construction documents in both hard copy and electronic format. Plans shall be AutoCAD compatible and all other documents shall be Microsoft Office compatible. The software version used shall be compatible to current CITY standards. Other support documents, for example, structural calculations, drainage reports and geotechnical reports, shall be submitted in hard copy only. All Record Drawings electronic files shall be submitted to the CITY in TIF format. E. The CONSULTANT recognizes that all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. Design 1 of6 D1. Revised 1/14 F. The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non -owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in limits ("Change in Coverage") except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT, CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT'S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. Design 2 of 6 1)1. Revised 1/14 G. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the CONSULTANT, his officers, employees, agents, or subcontractors under this CONTRACT. H. All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. SECTION II - PERIOD OF SERVICE This CONTRACT will be binding upon execution and end September 1, 2016 . SECTION 111 - CONSULTANT'S COMPENSATION A. The total compensation for the services performed shall not exceed the total noted in Section B. B. The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT based upon the following: 1. Basic Services (Lump Sum) $106,575.00 2. Additional Services shall require independent and specific authorization and shall be billed as (Lump Sum): 3. Bid Phase Services (Hourly Not to Exceed) 4. Construction Phase Services (Hourly Not to Exceed) 5. Reimbursable Expenses (Not to Exceed) 6. Total: $106,575.00 C. The CITY shall make payments to the CONSULTANT within thirty (30) days after receipt and approval of a detailed invoice. Invoices shall be submitted on a monthly basis. Design 3 of6 DI. Revised 1/14 SECTION IV - THE CITY'S RESPONSIBILITIES A. The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B. The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize delay in the progress of the CONSULTANT'S work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of the work. The CONSULTANT agrees that the CITY'S inspection, review, acceptance or approval of CONSULTANT'S work shall not relieve CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or its sub-consultant(s) or in any way affect the CONSULTANT'S status as an independent contractor of the CITY. SECTION V - TERMINATION A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason - - with or without cause -- by delivering written notice to CONSULTANT personally or by certified mail at 14800 St. Mary's Lane, Suite 160, Houston, Texas 77079. Immediately after receiving such written notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials supplied by the CITY on or before the 15`h day following termination of the CONTRACT. C. In the event of such termination, the CONSULTANT shall be paid for services performed prior to receipt of the written notice of termination. The CITY shall make final payment within sixty (60) days after the CONSULTANT has delivered to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D. If the remuneration scheduled under this contract is based upon a fixed fee or definitely ascertainable sum, the portion of such sum payable shall be proportionate to the percentage of services completed by the CONSULTANT based upon the scope of work. Design 4 of 6 DI. Revised 1/14 E. In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. F. If the CITY terminates this CONTRACT for cause and/or if the CONSULTANT breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney's fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under this CONTRACT. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. SECTION VI — ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. SECTION VII — COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability, and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent fee that has been paid. Design 5 oI'6 1)1. Revised 1/14 SECTION VIII- SUCCESSORS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. Y OF P ALAND, TEXAS DATE - NSULTA T TeR.Ar M, 6A/2/1- 2.4/ 40V 20/5 DATE Design 6 of 6 D1. Revised 1114 CITY OF PEARLAND & BRAZORIA DRAINAGE DISTRICT NO.4 MASTER DRAINAGE PLAN SCOPE OF WORK November 11, 2015 Preface Over the last several decades, the City of Pearland (City) and Brazoria Drainage District No. 4 (BDD4) have experienced significant growth and development throughout. The last decade alone has seen a two -fold increase in the area's population. With development comes an increased risk of flooding from streams as well as other sources, which can present hazards to the public and impede growth. In an effort to more effectively plan drainage improvements and consider regulatory measures aimed at minimizing negative development impacts, the City and BDD4 have taken a proactive approach. As such, the City of Pearland and Brazoria Drainage District No. 4 have selected Halff Associates to prepare a drainage master plan update for the combined area. The services and products resulting from the study shall be referred to as the City of Pearland/Brazoria Drainage District No. 4 Master Drainage Plan. The Pearland/Brazoria DD4 Drainage Master Plan is located within the shared boundary of the City and BDD4, which encompasses a combined area of nearly 97 sq. mi. The project is generally bound by Clear Creek to the north and FM 521 to the west. The eastern and southern boundaries are Tess clearly demarcated, with a portion of the City extending into Harris County on the east side of Clear Creek. The Galveston County line serves as the remainder of the eastern boundary. A majority of BDD4 is located north of SH6, with the exception of the area near the Fort Bend County line, which includes portions of Iowa Colony and Manvel. Streams to be included in the study will be Clear Creek, Hickory Slough, Mary's Creek, Cowart Creek and associates ditches and diversions, Chigger Creek and Mustang Bayou. The specific tasks to be completed for each stream will be specified in subsequent sections of this scope. The study area lies within fourteen (14) FEMA FIRM panels in three counties; Brazoria, Harris, and Fort Bend. The panels include those in Brazoria (48039C 00101, 0020H, 00301, 00351, 00401, 00451, 0110H), in Harris (48201C 1010L, 1030L, 1035L, 1055L), and in Fort Bend (48157 0305L, 0315L, 0455L). The effective dates vary. Project Purpose The purpose of the Master Drainage Plan is to conduct a two-phase update of the existing drainage information. While there does not appear to be an actively used drainage master plan, both the City and BDD4 have an extensive collection of drainage reports, studies, models, infrastructure plans, and other data that can be leveraged to plan for and encourage growth in a safe and cost-effective manner. In general, the tasks to be performed in each of the two phases are as follows: • Phase 1 — Collection of all relevant drainage information, including plans, reports, drainage complaints, flood insurance claims, hydrologic and hydraulic models, drainage criteria information, funding sources, etc.; Evaluation of the plans, reports, models, criteria, etc.; field investigation, verification, and documentation of existing drainage infrastructure; Generation of a digital inventory for all data collected; Updated drainage area and zone of influence delineations; Development and presentation of recommendations for Phase 2, including data and 1IPage modeling needs, alternative funding sources (such as Flood Protection Planning Grants), criteria updates, and implementation strategies. • Phase II — (NOT INCLUDED IN THIS CONTRACT) Updates to the existing conditions base modeling for both hydrology and hydraulics, which may include a variety of tools ranging from traditional 10 steady models to more advanced 2D modeling strategies; Identification of existing and future flood hazards and their sources; Comparisons of the existing flood mapping to the flood loss data; Evaluation of future growth patterns; Development of potential flood improvement alternatives using various mitigation strategies; Cost estimation and prioritization of potential capital projects; Implementation of the Master Drainage Plan and updates to the Drainage Criteria. A preliminary scope for Phase II will be prepared as part of the Phase I recommendations and/or Flood Protection Planning Grant application. Upon completion of Phase I and delivery of the recommendations to the City and BDD4, a detailed final scope will be prepared. The specific tasks associated with Phase I are discussed in the following scope of services. Project Scope Task 1: Wagon Trail Road Drainage Evaluation In response to historical as well as recent flooding in the area along Wagon Trail Road, Halff will evaluate the drainage patterns in an effort to identify flooding sources and recommend potential flood reduction measures in the area. The study area is located within the City of Pearland along Wagon Trail Road, between W Broadway St (FM 518) to the north and Mary's Creek to the south. There are several low- lying structures in the vicinity that experience flooding on a regular basis. This task will start upon approval of the contract and will be completed independently of the Master Drainage Plan discussed in subsequent tasks. Specific tasks relating to the Wagon Trail Rd. drainage evaluation include: a. Review of Existing Drainage Information i. Review the memorandum, calculations, and recommendations provided by IEA to the City in the 2013 report, Wagon Trail Road Drainage Improvement from Bardet Road to the Outfall at Fite Road Bridge. ii. Review plans and drainage calculations relating to the construction of the Corrigan Bypass channel. b. Topographic Survey i. Halff will prepare a 3-D Microstation file of 100' cross-sections limited to grade breaks and paving elevations within the outside top -of -bank of the roadside swale ditches and driveway approaches located along Wagon Trail Road (from Broadway to Ochoa), Cantu and Ochoa. Flowline information will be collected where physically possible on visible storm water facilities. Finish floor elevations of up to 6 adjacent structures will be tied. Benchmark elevations will be on the same datum as the City of Pearland. This proposal does not include uncovering or field tying any other improvements, above ground utilities or subsurface utilities, trees. ii. Right of Entry permissions will need to be obtained by the City. 21 Page c. Existing Conditions 2D Modeling i. Develop of a 2D computational mesh for the area generally bound by W Broadway Rd (north), Mary's Creek (south), Corrigan Bypass (east) and O'day Ditch (west). The initial 2D surface will include minimal feature detail. The detail will be refined after the initial run to focus on those areas where flooding is present. ii. Develop rainfall hyetographs for the 3 -year (design) storm, 100 -year, and recent historical rainfall obtained from gage records available on the Harris County Flood Warning System website. Infiltration losses will be estimated using HEC -HMS and the excess rainfall hyetograph will be entered into the 2D model for analysis. iii. Evaluate the modeled drainage patterns and compare to known flooding instances. Adjust and/or refine model detail based on initial findings. iv. Halff will meet with the City/BDD4 to discuss the existing conditions analysis findings and consider potential improvements to be modeled. d. Flood Reduction Alternatives Analysis i. Consider potential improvements to reduce flooding in the project area. Halff will evaluate up to three (3) small projects in the area, which may include but are not limited to increasing roadside ditch capacity, storm sewer improvements, and rerouting flow away from Wagon Trail Rd to the Corrigan Bypass. ii. Flood reduction alternatives will be sized using methods specified in the City/BDD4 design criteria. iii. Halff will develop conceptual level opinions of probable construction cost (OPCC) for each alternative. The OPCC's will include a contingency of 30-35% to account for potential conflicts during the design and construction phase. iv. Halff will prepare a technical memorandum discussing the analysis methodology, findings, improvement recommendations and associated costs. Task 2: Project Management and Coordination Halff Associates project management activities shall include task leadership and direction, telephone and written communication, project status reports, project progress meetings, project invoicing, and personnel and data management among other general project management activities. Specific meetings beyond staff management coordination and regular communication include the following: e. Project Meetings i. Attend one (1) project kickoff meeting with staff from both the City and BDD4. The meeting will be coordinated by the Halff Project Manager and is intended to discuss key items such as project schedule, budget, and any specific directives. Halff will provide a preliminary schedule of tasks. ii. Attend up to three (3) progress meetings throughout Phase I to discuss specific tasks such as data collection and inventory, model evaluation, and field verification, project tracking tools, etc. 31 Page iii. Attend one (1) meeting specifically related to the current drainage criteria and any desired updates or clarifications. iv. Attend two (2) meetings specifically related to the Phase I recommendations. The first shall be a preliminary recommendations discussion and the second shall be a final recommendations meeting, which shall be conducted near the Final Phase I submittal deadline. v. Attend one (1) public meeting or City Council meeting for the City of Pearland to discuss process, findings, and recommendations for Phase II and answer questions. vi. Attend one (1) public meeting or Brazoria County Commissioners Court meeting to discuss process, findings, and recommendations for Phase II and answer questions. vii. Meetings listed do NOT include those necessary to apply for or fulfill the obligations of an awarded Flood Protection Planning Grant. Application meetings are specifically identified in Task 7 and public meeting required to meet grant obligations will be conducted if a grant is awarded and will be included with the Phase 11 scope of services. viii. Meeting notes shall be submitted to the City and BDD4 Project Managers within five (5) working days after each meeting. f. Development of a Project Management Plan i. Develop a Project Management Plan (PMP) for the City and BDD4. This is a planning and communication document that will include specific information regarding to the scope and budget, as well as schedule, team resources, discussion of quality control procedures, and a communication plan. PMP shall be completed prior to the project kickoff meeting. ii. Within the PMP, the project schedule will be provided. Any delays to the project schedule shall be discussed in writing and provided to the City and BDD4 for review and approval. g. Project Status Reports i. Monthly project status reports shall be provided to the City and BDD4 with the monthly invoices. Separate monthly invoices will be provided for each agency, but the same project status reports will be provided. Progress shall include notes regarding work completed in the preceding billing cycle, work expected to be completed in the next cycle, and any outstanding questions or issues for discussion. h. Web Map Development i. A significant part of the communication and coordination effort for the Master Drainage Plan will be transparency of Halff's progress. Beyond the normal communication channels, Halff will develop a project web map, which may be accessed by both the City and BDD4. The web map will be continually updated with the data inventory and field data collection efforts that will be detailed in subsequent sections. Access permissions for the web map will be set to meet the specifications of the City and BDD4. Wage Task 3: Data Collection and Model Inventory Data Collection and model inventory tasks will generally include gathering and organization of all data provided, both hard copy and digital format. Data and models shall be provided by the City and BDD4, as well as from other sources such as Fort Bend County Drainage District (FBDD), Harris County Flood Control District (HCFCD), the Federal Emergency Management Agency (FEMA), the U.S Army Corps of Engineers (USACE), and other consultants if necessary. The data shall be organized and linked to a GIS dataset so that future data collection efforts by the City, BDD4, and other interested parties will be more efficient. Specific tasks relating to data collection include the following: a. GIS Data Collection i. Data requests will be directed to the City and BDD4, with additional requests made to outside entities if necessary. ii. Halff will collect and catalogue all relevant GIS data including, but not limited to, terrain (LiDAR) Data, landuse/zoning, FEMA (both mapping and loss data), planimetrics, political boundaries, development and subdivisions, detention locations, utility information, etc. iii. All GIS data gathered will be organized in Geodatabase format for use during the Master Drainage Plan process and will be provided back to the City and BDD4 as part of the Phase I Submittal. b. H&H Model Collection i. Models for Clear Creek will be downloaded from HCFCD website. In addition, USACE has a Federal project planned for Clear Creek. The model will be requested to ensure that planning efforts within the MDP area do not negatively impact the project. ii. Hydraulic models for the Clear Creek Tributaries, including Mary's Creek, Hickory Slough, Cowart Creek, and Chigger Creek will be requested from the City and BDD4. Hydrologic models for the tributaries will also be requested; however, they are also included in the Clear Creek model prepared for HCFCD. iii. Hydrologic and hydraulic models for Mustang Bayou will be requested from the City and/or BDD4 and, if necessary, FBDD. Mustang Bayou is not a tributary of Clear Creek and, as such, will not be connected to HCFCD. iv. Additional models developed within the project boundary will also be requested. These include modeling developed for regional detention pond projects, channel improvement projects, large scale developments, etc. A preliminary look at the models will be done to determine if they are relevant or if the watershed models include that information. c. Drainage Report and Record Drawings Collection i. Drainage reports developed for major development projects or capital projects, including detention, channel improvement, and storm sewer improvement, will be requested from the City and BDD4 ii. Record or "As -Built" drawings will be requested for improvements including, but not limited to, creek/bayou improvements, detention ponds, storm sewer trunk line, and major developments. Major detention facilities, such as the Mary's Creek Regional Detention Basin and the Southwest Environmental Center Regional Detention Basin, will be collected as part of this effort. 5IPage d. Data Organization and GIS Inventory i. As part of the data collection and inventory process, Halff will generate a digital record of all data including models, reports, and record drawings. Digital scans will be taken of each document and will be stored in an Adobe Acrobat (.pdf) format. The data will be managed by Halff Associates and delivered to the City and BDD4. ii. A GIS polygon layer will be created to represent the location of each report, plan set, and model identified during the project. Within the polygon feature class, records will contain the name of the project or study, agency responsible, a short description, and the pdf file of the report as a geodatabase attachment. Specific exhibits, such as those identifying feature ownership, will be provided with the submittal discussed in Task 7: Phase I Submittal. Areas within the feature classes will include but are not limited to: a. Areas depicting physical changes such as detention ponds, channel improvements, storm sewer trunk line improvements, or others completed as part of CIP or private development projects. Associated data fields will include information such as feature owner, type of improvement, date of completion, engineer of record, impacted area, and other fields requested by the City and BDD4. b. Hydrologic studies performed for watersheds or smaller areas will be identified with a watershed boundary. Associated data fields may include watershed name, agency responsible, receiving stream, watershed area, study date, engineer of record, and other fields requested by the City and BDD4. c. Hydraulic studies performed for creeks, bayous, or ditches may be identified with a linear feature denoting the specific location and limits of the study. Associated data fields may include stream name, owner, receiving stream (if applicable), study length, study date, engineer of record, and other fields requested by the City and BDD4. iii. The Geodatabase will be structured such that as new studies and projects are completed, they may be added into the GIS for future identification. iv. Halff will work with the City and BDD4 to transfer the data such that the proper linkage is maintained and the GIS and .pdf and model files remain connected. In the case of models, a file location may be provided or a .zip file with the relevant model files may be linked. v. The data inventory progress may be continually tracked and accessed by the City and BDD4 using the project web map discussed in the Transparency Tools section above. vi. Additional levels of data inventory may be provided to the City and BDD4 upon request, but are NOT included in this scope of services. This includes scans of individual plan sheets and report exhibits and connection to individual GIS features (i.e. a georeferenced polygon connecting to a specific plan sheet). Task 4: Analysis of Collected Data Data analysis tasks will generally include comprehensive analysis of all models, reports, record drawings and GIS information to determine the accuracy and validity of each. In addition, Halff will evaluate the current funding sources and consider alternative options for funding of future projects and studies. Halff 61Page will also review the current drainage criteria and work with the City and BDD4 to recommend any potential changes or clarifications that may be needed. Specific tasks relating to data analysis include the following: a. H&H Model Assessment Conduct a comprehensive evaluation of the hydrologic models for the major creeks and their tributaries received. Halff will check the models for reasonableness of model assumptions, rainfall inputs, loss parameters, hydrograph transform parameters, storage assumptions, and results. In addition, comparisons will be made to the discharges in the Effective FIS to ensure consistency. Any computational issues with the models will be identified. ii. Conduct a comprehensive evaluation of the hydraulic models for the major creeks and their tributaries. Halff will check models for reasonableness of reach and cross section layouts, section data, geometric parameters, including roughness, hydraulic structures, and results. The steady flow data will also be checked for correctness and consistency with the hydrologic models and/or Effective FIS. iii. In those cases where hydrologic models are in HEC -1 or hydraulic models are in HEC -2, a preliminary conversion to HEC-HMS/RAS will be done for evaluation. No significant changes will be made to the models during Phase I of the MDP. iv. Model results will be compared to the Effective DFIRM mapping data and the flood insurance claim data provided and discrepancies will be identified. For flood insurance claim data, Halff will compare the effective floodplains to specific claim locations to help determine if the flooding is riverine or caused by a localized flooding source. v. Halff will consider the drainage patterns and determine if the modeling tools utilized are appropriate or if other tools, including unsteady 1D or 2D modeling are recommended. b. Drainage Report and Record Drawing Analysis Conduct a comprehensive evaluation of the LOMRs, CLOMRs, and drainage reports for regional detention, channel improvements or major developments. A cursory review of other drainage reports will be conducted to determine if the information provided impacts the larger study. Halff will review the scope, assumptions, methodologies, and recommendations of reports. If results were carried forward to design or construction, Halff will compare with the construction or record drawings for consistency. Constructed projects will be evaluated for consistency during the field verification phase, which will be detailed below. ii. Halff will review record or "as -built" drawings of constructed projects. Comparisons will be made to on -the -ground information gathered during the field verification process and discrepancies will be identified. Comparisons to the models for storage volume and outfall capacity will also be conducted. c. Master Plan and CIP Plan Analysis i. A review of the current City of Pearland drainage plan (1998) will be conducted and its assumptions, findings and recommendations considered. ii. A review of the current Brazoria OD4 drainage plan (1997) will be conducted and its assumptions, findings and recommendations considered. 7 iii. A review of the City of Pearland 2015-2019 CIP Plan will be conducted with a focus on the drainage projects recommended. These projects will be included in the evaluation and prioritization to be completed as part of Phase II. d. Drainage Criteria Analysis i. Review the current drainage criteria for both the City and BDD4. Discuss with the City and BDD4 the general effectiveness of the criteria, areas of concern, clarifications, or additional criteria that should considered with respect to the design procedure or land use and zoning regulations. e. Funding Analysis i. Halff will assess the current sources of funding and determine if alternative means of study and project funding are necessary and feasible. Long term sources of project and study funding may include a Storm Water Utility (SWU), Storm Water Impact fees for areas benefiting from CIP, such as detention or channel improvements, and others. Task 5: Field Verification Field verification tasks will include on-site investigation of all major detention ponds and outfall structures into open channels. Halff will also evaluate the channels for general conformity with models assumptions and identify any significant erosion hazards. Mobile GIS data collection technology will the utilized during the process. Specific tasks relating to data analysis and field verification include the following: a. Mobile GIS Map Development i. Prior to the on-site reconnaissance process, Halff will configure a mobile map service for us with the Halff GIS iOS app. This app is designed to support field data collection and is available from the Apple App Store as a free download. The mobile map service allows users to access GIS data in real time from iPhones and iPads. The Halff GIS iOS app supports creating new data features, updating existing features, and referencing supporting GIS data layers. b. Field Data Collection Halff will conduct site visits of all storm sewer outfalls, regional detention ponds, and sections of the identified streams. Site visits will be conducted by two (2) persons, a project engineer and an EIT. During the site visits, Halff will geo-locate all features, photograph the feature, and include notes regarding the dimensions, conditions, etc. This data will be entered into the Halff GIS iOS app, which is connected to the server in real time through a cellular or Wi-Fi network. ii. As features are photographed and documented, the status will be updated from "not verified" to "verified". This designation will allow the City and BDD4 to continually track the field verification progress using the Transparency Tools discussed above. iii. Once the field verification process is complete, the GIS data developed will be evaluated for completeness and correctness and finalized. The data will be provided to the City and BDD4 as part of the final submittal. 81 Page Task 6: Phase I Recommendations The Phase I recommendations will include the development of a number of specific actions intended to improve the existing data, modeling, funding, and drainage criteria. These will be discussed with the City and BDD4 during a preliminary and final meeting, which are listed in Task 2. Specific tasks relating to the Phase I Recommendations include the following: a. Develop Phase I Recommendations i. Identify any additional data necessary to begin work on Phase II, such as survey, additional modeling, GIS information, etc. ii. Determine what updates and changes need to be made to the existing conditions modeling during Phase 11. Halff will attempt to utilize existing models to the maximum extent practicable. Updates may include the use of more advanced modeling techniques such as Unsteady and 2D modeling if necessary. Other updates may include modification of development levels, updated terrain information, etc. iii. Demonstrate the benefits of specific alternative funding sources such as Storm Water Utilities, Storm Water Impact fees, grants, etc. Provide recommendations for further exploring these options. Development and implementation of specific alternative funding streams is NOT included in this scope of services. iv. Recommend changes, additions, and/or clarifications to the existing drainage criteria. This may include changes to specific design criteria, as well as policy updates aimed at avoiding negative development impacts. Task 7: Flood Protection Planning Grant Application Preparation of the application for a Flood Protection Planning Grant (FPPG) to be submitted to the Texas Water Development Board (TWDB). TWDB will advertise for the 2016 grants in the fall of 2015 and applications will be due in early 2016. Development of the grant application will include the following tasks: a. Stakeholder Coordination i. Meet with City staff to confirm the purpose of the FPP Study and clearly define the detail study area located within the watershed basin. ii. Define potential project stakeholders (i.e. City of Pearland, Brazoria Drainage District No. 4, etc.) within the watershed FPP Study. iii. Meet with TWDB to coordinate the Grant application and confirm project objectives. iv. Notify political subdivisions, agencies, authorities, and planning groups in the proposed project area that an application for grant assistance is being submitted to the TWDB. v. Obtain Letters of Support and/or Interlocal Agreements with project stakeholders. b. Grant Application i. Document the study needs and compile existing available leverage (LiDAR, H&H Models, HWM's, Flood Records, SRL's ...etc.). This task will be completed as part of the data collection and analysis tasks discussed above. 91Page ii. Develop a project scope and budget for the FPP and define sources of funding (Cash contribution, In -Kind, Interlocal Agreements, etc.) iii. Prepare the Grant Application and submit to TWDB Task 8: Phase I Submittal The Phase I submittal will include the project deliverables; a detailed narrative discussing the data collection and inventory process, compilation of all the data collected and evaluated, updated digital information, including GIS, H&H models, photos, and recommendations for Phase II. Specific tasks relating to the Phase I Submittal preparation include the following: a. Digital Data Deliverable i. Prepare the MDP Geodatabase for submittal. The Geodatabase will include the feature classes relating to the model inventory and report/plan inventory developed as part of Task 3 as well as the field data collected as specified in Task 5. Among other data fields, ownership of features will be identified. Other relevant digital data collected will be organized into the Geodatabase as well. ii. Update delineations of all drainage basins located within the project areas using a polygon feature. These will include delineations for the stream watershed as well as drainage subbasins for contributing streams and ditches. These will be included in the Geodatabase. iii. Identify service areas for the major regional detention facilities, identifying the contributing area using a polygon feature. The information will be included in the Geodatabase. iv. Map the 100- and 500 -year floodplains for Clear Creek on the Brazoria County side. Halff will utilize the effective BFE's from the HCFCD study and map on the most current LiDAR terrain surface. The information will be included in the Geodatabase. v. Provide the full library of scanned documentation, including reports and record drawings. The associated GIS features will be included in the Geodatabase. vi. Provide all models collected as well as any model updates. The models will be catalogued and include the location, date prepared, and any other information available. The associated GIS features will be included in the Geodatabase. The evaluation will be provided as part of the narrative; but notes will be included in the GIS. vii. Provide all photos taken during the field verification process in .jpg format. Photos will be compressed to a size not to exceed 1Mb. The associated GIS features will be included in the Geodatabase. b. Report Deliverable i. Prepare a detailed report, including a narrative discussion the procedures and findings of each task, relevant figures and tables, meeting notes and a log of project decisions. Copies of the digital information will be included on CD/DVD with the report. ii. A preliminary scope of services and fees for Phase II will be provided with the final report. The scoping will be completed as part of the Flood Protection Planning Grant application discussed in Task 7. 101 Page Task 9: Quality Assurance/Quality Control Each task will be subjected to internal QA/QC by a separate water resources team at Halff. Associated documentation will be provided with the Final Phase I Report. Specific tasks relating to the QA/QC process include the following: a. QA/QC Procedures i. The QA/QC program will include a multi-level approach to ensure that senior members review, comment, and approve the completed work. Quality control check lists shall be created for the data collection, GIS data development, and final report elements of the work. Each checklist shall include milestone review events that describe the items to be reviewed and include documentation of the comments by the reviewer and responses from the Project Manager. All project materials presented to the City and BDD4 as draft or final products will be accompanied by QA/QC certification. QA/QC will be performed for the following specific tasks: a. Data and Model Inventory — Including the data scans and associated Geodatabase b. Field Data Verification — Including notes and photos taken as well as the GIS data developed in the field. c. Phase I Report — Including the narrative, exhibits, and tables. The final digital submittal will also be reviewed. ii. The ENGINEER shall retain all work products generated and information gathered and used during the course of the project. This includes, but is not limited to, base data as well as intermediate work products. 111 Page CITY OF PEARLAND & BRAZORIA DRAINAGE DISTRICT NO. 4 MASTER DRAINAGE PLAN LEVEL OF EFFORT ESTIMATE November 11. 2015 .Y `o _ 2 u U z s S' 4 Project Physes and Tasks' 'i 'o ee E. - o lin _ - ; 4 _ 0 z a - _ Ii ti m w 0.6z ` c W '^ ` w N= U N a a 6 0250.00 5200.00 5175.00 9150 00 5100.00 5150 00 5110 00 575.00 565.00 Hours Task 1: Wagon Trail Road Drainage Evaluation Review Drainage Report and Calculations 2 4 8 91.809 01.800 Topographic Survey 64 $9.607 59,600 Existing Cond8ions 2D Modeling 12 18 48 .1 510.200 510.200 Flood Reduction Alemaeves Analysis 8 16 40 08.302 58.300 Subtotal Task 1 0 22 0 38 96 64 0 8 0 $20,900 SO 529.900 Task 2: MDP Management 8 Coordination Development of Project Mangement Plan 1 1; 4 53,350 53,350 Project Kickoff Meeting 8 Minutes (1) 2 .. 7 2 4 52.010 550 52.060 Project Update Meetings 8 Minutes (6) i.. 12 4 55,880 5300 56,180 Preparation and Public Meeting (2) 2 8 4 4 54,250 5120 54.370 Project Coordination .. 4 52,900 52.900 Project Salus Reports (8) .. 8 51,320 51.320 Web Map Development 53.280 03.280 Srb1Mal Task 2 S, 18 22 8 0 10 16 16 S22 993 54/0 523,460 Task 3: Data Collection 8 Model Inventory GIS Data Colectbn (Cay, 8OO4, FEMA, Etc.) 8 51 550 51,550 H&H Model Colection 8 SI 550 $1.550 Drainage Report and Record Drawings a 1; 16 53.600 '4, CC S3.700 Data Organization and GS Inventory Digital Scan of Repons/P41ns 1 8 24 S2 860 52,860 Devebpnent of Goodatabase 1 8 8 51820 01,820 Dig0ae Feature Classes for Data 2 e 2 51.350 51,350 Digitize Feature Classes for Models 2 51.350 51.350 S,hto1al T448 3 :I 16 4 26 s8 0 ( 12 24 514.080 5100 514.180 CITY OF PEARLAND & BRAZORIA DRAINAGE DISTRICT NO. 4 MASTER DRAINAGE PLAN LEVEL OF EFFORT ESTIMATE November 11, 2015 Project Phases and Tasks' q .4 'Y S g 2 " .xu• , L ig g' $ C. _ 11 _1 1„,.. �IC F `o d t 'Q C W II. _ _ e' W~ rJ Z N ; Y # U O `o N c9 `o ' C E 4 Q c a _ — ❑ ❑ � 1 Task 4: Analysis of Colloctod Data 0084 Model Assessment Evaluate HBH Models 4 4 32 64 512.700 512.700 Convert Models to HEC-HMS/RAS 1 2 16 24 55,350 55,350 Compare Resins to FEMA Maps and Loss Info 1 4 8 51.600 51,600 Drainage Report and Record Drawing Assessment f 8 40 80 515,800 815,800 Master Plan and CIP Evaluation 8 20 40 58,800 08.600 [range Cme6a Evaluation .. It 16 8 55,400 55.400 F lending Assessment 4 8 6 54,000 54.900 S .n:Mar Task 4 28 30 I 13: 224 0 0 0 1. 554,350 50 354.350 Task 5: Field Verification •L. - a Mobile GIS Map Devodpmont 1 n S 1.020 51.020 Field Data Coleabn/Documentation F told Data Colleclnn I t; 81, ?.(1 523 800 51100 00 024.400 GIS Data Review 4 4 8 53 080 53,080 Subtotal Task 5 0 21 8 80 80 0 10 16 0 027 900 5600 528.500 Task 8: Phase I Recommendations Specify AddOnnal Data Needs 1 51 31,0 51.350 Recommend Updates to Existing ?skate's 1 8 l.. 5.1 :03 S3.600 ',recommend Alternative Funding Options 17 0 -. Iti 000 27,800 Recommend Cetera Updates .• . r, 0 > ,. ,: 55,650 0,610131 Task 6 0 20 20 7.1 40 0 0 0 0 S 18 400 SO 518.400 CITY OF PEARLAND & BRAZORIA DRAINAGE DISTRICT NO. 4 MASTER DRAINAGE PLAN LEVEL OF EFFORT ESTIMATE November 11, 2015 Project Pharos and Tasks' o.y w d s o' a o >? S o f �Y1 ` ° e' i w - a w J Za N 3 ru N in3 tat N c -� C 8 E u Ti c' w 2 a' o u a 12 F ° o Task 7: Flood Protection Planning Grant Slakeholder Coordmauon 2 66 4 1J '1 54810 530000 85.110 0,481 6005841ton1 4 4 0 6 53.680 53.880 O Je50141 Task? 3 10 10 12 18 0 0 0 6 58.480 5300 88,790 Task 6: Phase I Submittal Digital DMa Submetal Complete Final Geodatabase1 2 ., 7 4 51.420 51.420 Update Drainage Basin Delineaton1 4 1. 1 02,475 82.475 Delineate Regional Detention Service Areas1 1 n 1 51,225 51,225 Clear Creek Floodplain Mappng1 2 8 51.300 61.300 Prepare Grattage RepoNRecord Draxnng Library1 2 5900 5900 Prepare Model Catalogue 2 5700 8700 Prepare Photo Catalogue 2 8 81,100 81,100 Report Preparation Narrative Development . 4 ,.• 16 57 065 57,065 Exhibit Prepratbn 4 16 53.130 53,130 Tables 6 Figures Preparatbn 4 8 02.330 52,330 Subtotal Task8 0 :t7 0 27 92 0 2 6 021645 .,.. 821,650 Task 9: Quality Assurance/Quality Control Data and lAodel Inventory QAi0C1:• 1 54.640 54.640 Field Data Vedic -aeon QAIQC 7 1. 1 54.640 64,640 Phase 1 Report 00.QC 7 81, 1 54,640 64.640 Subtotal Task9 6 24 36 0 0 12 0 0 513,920 50 513,920 PROJECT TOTALS 23 238 126 363 606 64 36 58 51 8211.675 81.470 8213,150 SAAt4•HOUR PERCENTAGES 1.5% 152% 81% 23 7% 387% 4 1% 2.3% 3.7% 33% 1 aaDaiOrtInV •(u Toro Jan -3' L:;m5n LEGEND 111=Pearlen0r8004 MDPArea amain DIM ® Poulenc! Paadand ETJ '1> Nvin ecookaida V llpe - Iowa Colony Mune! TL1 1. HOUSTON 1'.i.. adr ii.. Souve+ fen'Oelltt e-NAVtEO I/SCS'ArWelniag. Ir�C`pyyC/y11 f F; ,bp tin. MEiLEa,I )Kau Evillhs4d, lo0.10e,m)em CITY OF PEARLAND BRAZORIA DD4 MASTER DRAINAGE PLAN PROJECT LOCATION MAP October 2015 0 4.000 8,000 16.000 Feet 1 inch = 8.000 feet Notes: 1) Aortal imagery fol Pearland. T% and surrounding ares provided by Landiscor 2014 21 Project area includes the Cool Peanaud and Brant. 004 Porton, of other cies, InCIuding Brookside village. Manvel. Iowa Colony arw Alvis are also located wdMn the p107001 area es well. !!E HALFF NALFF ASSOCIATES. INC. 14800 SAINT MARYS LN. SUITE 141' HOUSTON, TX 70079.2943 w^Nw HAI , COM Exhibit C MBCO Engineering, LLC. MOSS 1 BLETSCH CRENEK OLLER IEA WAGON TRAIL ROAD DITCH DRAINAGE ANALYSIS PROJECT SCOPE The City of Pearland Public Works employed MBCO Engineering, LLC. (MBCO) to perform the drainage analysis of the Wagon Trail Road ditches from Mary's Creek to FM 518 and along FM 518 from west of Wagon Trail Road to the Corrigan Creek By -Pass. The project scope consisted of the following steps to perform the ditch drainage analysis: 1. Collect Topographical Survey Data and LIDAR data of the project area along Wagon Trail Road, FM 518, Hatfield Road, Mary's Creek and Corrigan Creek By -Pass. 2. Analyze the data to determine drainage areas, flow patterns, and size the existing ditches to help with future drainage 3. Develop letter report and recommendations for the City of Pearland Public Works to identify methods that will improve the drainage along Wagon Trail Road. EXISTING CONDITIONS The project area is a two lane asphalt roadway with open ditch drainage and a 60 foot right of way. The limits of Wagon Trail Road with respect to the project area is from Mary's Creek to FM 518. The distance of the project area along Wagon Trail Road is approximately 4,725 linear feet of roadway which equates to approximately 9,450 linear feet of ditches. The project area has cross streets and drainage which include: Figland Street, Fite Road, Bardet Street, Ochoa Road, Cantu Road and Josephine Street. The cross streets are 2 lane asphalt roadways with open ditch drainage. The project area included 200 linear feet of each of the cross streets. The existing drainage along Wagon Trail Road travels north and south with the high point being south of Bardet Street at approximate Station 17+50. There are seventy (70) existing culverts that convey the drainage along Wagon Trail with sizes varying from 15 inch to 30 inch diameter pipes and the material of the pipes vary from corrugated metal to HDPE to reinforced concrete pipe. Several of the culverts do not meet the current City of Pearland Standard minimum culvert size. Through meetings with stakeholders in the project area, the area has experienced flooding during extreme rain events since the beginning of the year. Observations during some of the recent rain events show that the FM 518 ditch and the west ditch north of Bardet to FM 518 experience the worst back-up and potential for area flooding within the project area. There was also structural flooding coming out of the inlets on both FM 518 and Wagon Trail as well as street flooding due to the severity of the storms. TOPOGRAPHICAL SURVEY AND CULVERT FLOW SPREADSHEET The first part of the scope of services was to gather data through the use of survey equipment to develop the digital terrain model and pick up the topographical features of the project area. MBCO sent out a three man crew with two GPS Trimble units to collect the existing terrain of the project area. The surveying took 4 days in the field. The crew collected the ditch along the south side of FM 518 and along both sides of Hatfield and the first 400 linear feet of 1 MBCO Engineering, LLC. MOSS 1 BLETSCH 1 CRENEK I OLLER IEA Wagon Trail on the first day. On the second day the crew collected the ditches along Josephine, Ochoa, Bardet, Fite and the next 3000 linear feet of Wagon Trail. The crew picked up the rest of Wagon Trail and the topography of Mary's Creek at the end of Wagon Trail and the cross sections along Corrigan Creek By -Pass. The final day the team collected the inverts of the storm sewers and collected some missing data requested by the engineer. Once we had all the field data, MBCO processed and created a 3 dimensional topographical survey file and developed a digital terrain model (DTM) of the project area. Once the topographical survey was completed, road alignments were created for the project and all the culverts were assigned a Station ID. The Station IDs and the survey allowed the Engineer to input the following data into the Culvert Flow Spreadsheet (See Exhibit 1): • Upstream and downstream flow line elevations of each culvert • Station location of the each culvert • Distance between each culvert • Culvert Size and material Based on the information above the Culvert Flow spreadsheet computed the slope (%) and direction (North/South/East/West) of each culvert and the slope (%) and direction (North/South/East/West) of the ditches between each culvert. This will allow the City of Pearland (City) to look at the entire project and determine which culverts are in need of adjustment due to settlement and/or age of culvert. This data also allows the City to have a snapshot on the flow patterns of the existing ditches and identify areas of potential ponding due to contraflow of the ditch because of a culvert sloped in the wrong direction and/or slope. The second purpose of the Culvert Flow spreadsheet is to provide upstream and/or downstream flow lines to make the corrections to the existing culverts to change the slopes on the ditches to create improved flow in the ditches. The culvert sizes will be evaluated in the drainage analysis defined in the next section and sizes may be adjusted in the Culvert Flow spreadsheet based on the findings of the Drainage Analysis to improve ditch capacity and flow. DRAINAGE ANALYSIS The purpose of the drainage analysis is to determine the existing flow patterns along Wagon Trail, quantify peak discharges to the roadside ditches, and determine proposed driveway culvert sizes. The drainage analysis was performed in accordance with the City of Pearland Enqineerinq Desiqn Criteria Manual, dated June 2007. Peak runoff discharges and proposed driveway culvert capacities were analyzed using a 3 -year storm event. The following is a detailed summary of the drainage analysis along Wagon Trail. Drainage Areas and Flow Patterns Drainage areas were delineated using a combination of 2008 LiDAR based contour mapping as provided by the City, topographical survey data, and field observations. Survey data collected along Wagon Trail provided flow line elevations for the existing ditches and driveway culverts. This survey information was used to provide a more detailed examination of the flow patterns within the existing Wagon Trail ROW and to aid in the delineation of the drainage areas. A thorough site visit was conducted on July 22, 2015 to verify the existing drainage area boundaries, flow patterns, and land use conditions. 2 MBCO Engineering, LLC. MOSS 1 BLETSCH 1 CRENEK OLLER IEA The land use of the contributing drainage areas is a mixture of commercial, residential, and open grassy areas. The contributing drainage areas are relatively flat and the drainage patterns consist of overland sheet flow to Wagon Trail. The roadside ditches along Wagon Trail collect the runoff from the contributing areas and convey the runoff to two outfall points located at FM 518 and Mary's Creek. An existing drainage divide within the roadside ditches is located near Bardet Street. From this drainage divide, the existing roadside ditches drain north to FM 518 and south to Mary's Creek. For the purpose of this drainage analysis, there are a total of four drainage outfall points. These four outfall points account for the ditches on the east and west side of Wagon Trail that drain to FM 518 and Mary's Creek. The outfall points are identified as A, B, C, and D. The drainage area ID's used for this analysis are named according to their respective outfall location. The drainage area map is provided as Exhibit 2. Computed Peak Discharges Peak runoff discharges were computed using the Rational Method. The Rational Method parameters include the drainage area, runoff coefficient (C -Value), time of concentration, and rainfall intensity. Runoff coefficients for the Wagon Trail roadway and contributing areas were based on current land use conditions. The offsite contributing drainage areas development types and impervious cover was determined by using aerial photography. The impervious cover along Wagon Trail was determined using topographic survey data. The C -Values selected for the offsite contributing areas were obtained from Chapter 5 of the COPEDCM and are listed Table 1 below. Table 1- Rational Method Runoff Coefficients "C -Values" Land Use Description C -value Large Lot Residential 0.40 Small Lot Residential 0.50 Commercial 0.85 Wagon Trail Pavement 0.90 Open Grassy Areas 0.20 Time of concentrations for the Rational Method were determined by dividing the flow into two segments: overland and ditch flow. For the overland flow segment, an assumed velocity of 0.50 fps was used and a velocity of 1.0 fps was assumed for the ditches. Each flow segment travel time was summed to determine the total time of concentration for each drainage area. A 15 -minute minimum time of concentration was considered for all drainage areas. Rainfall intensity calculations for the Rational Method are dependent on the time of concentration. Rainfall Intensity Duration Frequency Curves (IDF) obtained from the City of Pearland Drainage Criteria Manual were used to determine rainfall intensities for each drainage area. The peak runoff discharges were calculated for a 3 -year storm event. Table 2 provides a summary of the peak discharges for each drainage area. Driveway Culverts The driveway culverts were evaluated to determine the proposed sizes based on hydraulic capacity in comparison with each driveway culverts peak discharge. The driveway culverts were determined based on full flow capacity 3 MBCO Engineering, LLC. moss' BLETSCH CRENEK I OLLER IEA using a max size of 24" RCP due to the shallow ditches. An 18" RCP was set as the minimum size for this analysis. Multiple culverts were used in order to meet the hydraulic capacities. In some cases, more than two culverts were used even though this will most likely not fit within the ROW of Wagon Trail. The goal is to provide the flow area that is required for each of the driveway culverts needed to satisfy the hydraulic capacity requirements. Table 3 provides a summary of the driveway culvert sizes. Table 2 - Summary of Peak Discharges 3 -Year Storm Event NODE ID CUMULATIVE AREA (ac) TC (minutes) CUMULATIVE C VALUE INTENSITY (in/hr) CUMULATIVE DISCHARGE (cfs) DITCH A A-1 6.15 27.37 0.83 4.09 20.97 A-2 5.90 25.98 0.84 4.20 20.69 A-3 4.84 23.60 0.84 4.40 17.79 A-4 4.07 21.93 0.84 4.56 15.52 A-5 3.25 20.06 0.84 4.75 12.90 A-6 2.79 19.04 0.84 4.86 11.36 A-7 2.25 17.69 0.84 5.02 9.47 A-8 1.32 15.65 0.84 5.28 5.88 A-9 0.78 15.00 0.84 5.37 3.50 DITCH B B-1 22.91 41.45 0.46 3.3 34.90 B-2 22.81 40.48 0.46 3.3 34.77 B-3 22.51 39.66 0.46 3.34 34.70 B-4 22.15 38.64 0.46 3.39 34.60 B-5 21.60 38.09 0.46 3.47 34.46 B-6 21.6 37.11 0.46 3.47 34.45 B-7 21.29 36.25 0.46 3.52 34.36 B-8 18.85 35.14 0.45 3.58 30.69 B-9 15.84 32.92 0.45 3.71 26.35 B-10 15.52 31.71 0.45 3.78 26.29 B-11 9.62 31.18 0.42 3.82 15.31 B-12 2.96 29.18 0.42 3.95 4.96 B-13 2.81 27.73 0.42 4.06 4.80 B-14 2.72 26.76 0.42 4.13 4.70 B-15 2.68 26.34 0.42 4.17 4.65 B-16 2.62 25.68 0.42 4.22 4.59 B-17 2.39 23.11 0.41 4.44 4.34 B-18 1.74 21.54 0.4 4.59 3.20 B-19 0.78 18.49 0.38 4.92 1.46 B-20 0.19 15 0.27 5.37 0.28 4 MBCOIEngineering, LLC. MOSS I BLETSCH CRENEK oLLF_R Table 2 - Summary of Peak Discharges (Cont.) IEA NODE ID CUMULATIVE AREA (ac) TC (minutes) CUMULATIVE C VALUE INTENSITY (in/hr) CUMULATIVE DISCHARGE (cfs) DITCH C C-23 57.89 61.89 0.37 2.55 54.33 C-22 48.21 57.29 0.38 2.68 49.12 C-21 47.31 56.73 0.38 2.70 48.44 C-20 46.10 55.89 0.38 2.72 47.56 C-19 41.60 54.16 0.38 2.80 43.92 C-18 41.48 53.72 0.38 _ 2.80 43.78 C-17 41.30 53.26 0.38 2.80 43.57 C-16 40.48 51.65 0.38 2.86 43.43 C-15 38.98 49.24 0.38 2.94 43.00 C-14 33.84 46.91 0.38 3.03 38.58 C-13 28.91 45.38 0.38 3.09 33.95 C-12 28.49 44.42 0.38 3.13 33.86 C-11 27.69 42.58 0.38 3.21 33.68 C-10 25.39 41.29 0.39 3.27 31.94 C-9 22.98 39.33 0.38 3.36 29.53 C-8 20.19 34.59 0.38 3.61 27.87 C-7 19.81 33.44 0.38 3.68 27.84 C-6 12.93 33.00 0.46 3.70 22.22 C-5 7.86 21.41 0.55 4.61 19.84 C-4 6.47 20.06 0.58 4.75 17.74 C-3 3.65 17.25 0.71 5.07 13.16 C-2 2.36 15.93 0.83 5.24 10.28 C-1 1.65 15.00 0.84 5.37 7.43 DITCH D D-21 22.17 52.59 0.46 2.83 28.55 D-20 19.67 50.72 0.45 2.89 25.79 D-19 18.8 49.26 0.46 2.94 25.22 D-18 18.31 48.35 0.46 2.97 24.92 D-17 17.92 47.69 0.46 3 24.66 D-16 16.69 45.36 0.46 3.09 23.87 D-15 15.37 44.67 0.47 3.12 22.43 D-14 12.72 43.76 0.48 3.16 19.34 D-13 11.6 40.17 0.49 3.32 18.78 D-12 10.71 39.12 0.5 3.37 17.86 D-11 8.34 36.55 0.48 3.5 14.08 0-10 6.9 35.02 0.41 3.58 10.12 0-9 5.06 32.63 0.4 3.73 7.50 5 MBCOJEngineering, LLC. MOSS ( BLETSCH CRENEK OLI E_k Table 2 - Summary of Peak Discharges (Cont.) IEA NODE ID CUMULATIVE AREA (ac) TC (minutes) CUMULATIVE C VALUE INTENSITY (in/hr) CUMULATIVE DISCHARGE (cfs) DITCH D 0-8 2.98 30.57 0.42 3.86 4.86 D-7 2.83 28.99 0.42 3.97 4.69 D-6 2.72 27.92 0.41 4.05 4.55 D-5 2.54 26.03 0.41 4.19 4.35 D-4 2.24 23.58 0.41 4.4 4.07 D-3 1.3 20.9 0.41 4.66 2.49 D-2 0.64 17.5 0.41 5.04 1.34 D-1 0.24 15 0.41 5.37 0.54 Table 3 - Summary of Driveway Culverts 3 -Year Storm Event ID STATION CUMULATIVE AREA (ac) CUMULATIVE DISCHARGE (cfs) CULVERT N -VALUE CULVERT SLOPE (FT/FT) CULVERT QUANTITY PIPE DIAMETER (FT) CULVERT CAPACITY (CFS) DITCH A A-1 10+53.48 6.15 20.97 0.013 0.002 3 2 30.43 A-2 11+68.49 5.90 20.69 0.013 0.002 3 2 30.43 A-3 13+58.70 4.84 17.79 0.013 0.002 2 2 20.29 A-4 14+85.40 4.07 15.52 0.013 0.002 2 2 20.29 A-5 16+22.77 3.25 12.90 0.013 0.002 2 2 20.29 A-6 16+98.81 2.79 11.36 0.013 0.002 2 2 20.29 A-7 17+88.60 2.25 9.47 0.013 0.002 1 2 10.14 A-8 18+94.92 1.32 5.88 0.013 0.002 1 2 10.14 A-9 19+51.43 0.78 3.50 0.013 0.002 1 2 10.14 DITCH B 8-1 12+38.73 22.91 34.90 0.013 0.002 4 2 40.58 B-2 13+29.61 22.81 34.77 0.013 0.002 4 2 40.58 B-3 14+05.98 22.51 34.70 0.013 0.002 4 2 40.58 B-4 15+00.58 22.15 34.60 0.013 0.002 4 2 40.58 B-5 15+52.60 21.60 34.46 0.013 0.002 4 2 40.58 B-6 16+43.12 21.6 34.45 0.013 0.002 4 2 40.58 B-7 17+23.15 21.29 34.36 0.013 0.002 4 2 40.58 B-8 18+24.57 18.85 30.69 0.013 0.002 4 2 40.58 B-9 20+19.54 15.84 26.35 0.013 0.002 3 2 30.43 B-10 21+25.62 15.52 26.29 0.013 0.002 3 2 30.43 B-11 21+65.87 9.62 15.31 0.013 0.002 2 2 20.29 8-12 22+80.94 2.96 4.96 0.013 0.002 1 2 10.14 6 MBCO Engineering, LLC. MOSS 1 BLETSCH , CRENEK ; OLLER Table 3 - Summary of Driveway Culverts (Cont.) IEA ID STATION CUMULATIVE AREA (ac) CUMULATIVE DISCHARGE (cfs) CULVERT N -VALUE CULVERT CULVERT SLOPE QUANTITY (FT/FT) 1 PIPE DIAMETER (FT) CULVERT CAPACITY (CFS) DITCH B B-13 23+65.99 2.81 4.80 0.013 0.002 1 2 10.14 B-14 24+21.10 2.72 4.70 0.013 0.002 1 1.5 4.71 B-15 24+46.45 2.68 4.65 0.013 0.002 1 1.5 4.71 8-16 24+85.16 2.62 4.59 0.013 0.002 1 1.5 4.71 8-17 26+27.73 2.39 4.34 0.013 0.002 1 1.5 4.71 8-18 27+06.97 1.74 3.20 0.013 0.002 1 1.5 4.71 8-19 28+42.37 0.78 1.46 0.013 0.002 1 1.5 4.71 B-20 29+43.09 0.19 0.28 0.013 0.002 1 1.5 4.71 DITCH C C-23 56+26.06 57.89 54.33 0.013 0.002 6 2 60.87 C-22 51+67.87 48.21 49.12 0.013 0.002 5 2 50.72 C-21 51+12.10 47.31 48.44 0.013 0.002 5 2 50.72 C-20 50+29.39 46.10 47.56 0.013 0.002 5 2 50.72 C-19 48+60.56 41.60 43.92 0.013 0.002 5 2 50.72 C-18 48+17.50 41.48 43.78 0.013 0.002 5 2 50.72 C-17 47+72.61 41.30 43.57 0.013 0.002 5 2 50.72 C-16 46+16.11 40.48 43.43 0.013 0.002 5 2 50.72 C-15 43+82.47 38.98 43.00 0.013 0.002 5 2 50.72 C-14 41+61.04 33.84 38.58 0.013 0.002 4 2 40.58 C-13 40+20.16 28.91 33.95 0.013 0.002 4 2 40.58 C-12 38+77.79 28.49 33.86 0.013 0.002 4 2 40.58 C-11 37+07.80 27.69 33.68 0.013 0.002 4 2 40.58 C-10 35+89.80 25.39 31.94 0.013 0.002 4 2 40.58 C-9 34+14.98 22.98 29.53 0.013 0.002 3 2 30.43 C-8 29+92.70 20.19 27.87 0.013 0.002 3 2 30.43 C-7 28+91.23 19.81 27.84 0.013 0.002 3 2 30.43 C-6 28+34.06 12.93 22.22 0.013 0.002 3 2 30.43 C-5 26+04.06 7.86 19.84 0.013 0.002 2 2 20.29 C-4 24+96.86 6.47 17.74 0.013 0.002 2 2 20.29 C-3 22+86.30 3.65 13.16 0.013 0.002 2 2 20.29 C-2 21+91.18 2.36 10.28 0.013 0.002 2 2 20.29 C-1 21+04.90 1.65 7.43 0.013 0.002 1 2 10.14 DITCH D D-21 56+40.00 22.17 28.55 0.013 0.002 3 2 30.43 D-20 53+91.00 19.67 25.79 0.013 0.002 3 2 30.43 D-19 52+66.53 18.8 25.22 0.013 0.002 3 2 30.43 7 MBCO Engineering, LLC. moss! BLETSCH j CRENEK 1 OLLER Table 3 - Summary of Driveway Culverts (Cont.) IEA ID STATION CUMULATIVE AREA (ac) CUMULATIVE DISCHARGE (cfs) CULVERT N -VALUE CULVERT SLOPE (FT/FT) CULVERT QUANTITY PIPE DIAMETER (FT) CULVERT CAPACITY (CFS) DITCH D D-18 51+89.96 18.31 24.92 0.013 0.002 3 2 30.43 D-17 51+33.69 17.92 24.66 0.013 0.002 3 2 30.43 D-16 49+37.45 16.69 23.87 0.013 0.002 3 2 30.43 D-15 48+79.74 15.37 22.43 0.013 0.002 3 2 30.43 D-14 48+07.16 12.72 19.34 0.013 0.002 2 2 20.29 D-13 45+22.82 11.6 18.78 0.013 0.002 2 2 20.29 D-12 44+39.60 10.71 17.86 0.013 0.002 2 2 20.29 D-11 42+47.32 8.34 14.08 0.013 0.002 2 2 20.29 D-10 41+38.68 6.9 10.12 0.013 0.002 1 2 10.14 0-9 39+78.95 5.06 7.50 0.013 0.002 1 2 10.14 0-8 38+62.54 2.98 4.86 0.013 0.002 1 2 10.14 D-7 37+72.64 2.83 4.69 0.013 0.002 1 1.5 4.71 D-6 37+09.96 2.72 4.55 0.013 0.002 1 1.5 4.71 D-5 36+05.19 2.54 4.35 0.013 0.002 1 1.5 4.71 D-4 34+71.00 2.24 4.07 0.013 0.002 1 1.5 4.71 D-3 32+72.48 1.3 2.49 0.013 0.002 1 1.5 4.71 0-2 31+34.52 0.64 1.34 0.013 0.002 1 1.5 4.71 0-1 30+49.54 0.24 0.54 0.013 0.002 1 1.5 4.71 RECOMMENDATIONS The Wagon Trail Road drainage system is under sized and is in need of repair. There is a large amount of drainage area that is coming to the open ditch system that discharges into Mary's Creek and into the FM 518 ditch system. As shown in Table 3 in the drainage analysis section, the amount of pipes needed at each culvert crossing exceeds the size the ditch currently allows and would require additional right of way to be put in place. The recommendations of this report are two fold and are described below: Short Term/ Immediate Recommendations The original design frequency for the ditches in this area are unknown. For the purpose of the engineering calculations in this report it is assumed that the Wagon Trail ditches can hold a 3 -year frequency storm and the ditches along FM 518 can hold a 5 -year frequency storm to stay consistent with the City of Pearland Storm Sewer Design Criteria, Chapter 5, Section 5.5.2, Design of Storm Sewers. The flooding issues will not be resolved without a major capital improvement initiative that will increase the storm frequency that the systems can handle. Any storms that exceed the current design frequencies will result in the surrounding ditches and storm sewer systems to flow at or above capacity. The short term and immediate recommendation is to make sure that the ditches on Wagon 8 MBCO Engineering, LLC. MOSS 1 BLETSCH CRENEK I OLLER IEA Trail and the south ditch along FM 518 from Wagon Trail to the Corrigan By -Pass are included in the City's ditch maintenance program and are adjusted by referring to the Culvert Flow spreadsheet. Ditches may also be widened in the field to help increase the storage capacity and allow for the installation of additional culverts but these modifications need to be field engineered by the Engineer of Record and will only improve the system's efficiency but not correct the current situation. Based on the results from Table 3 and the recommendations of the culvert improvements in the Exhibit 1; Exhibits 3 and 4 are the preliminary installation costs for Wagon Trail Road culverts. These costs do not include any recommended adjustments on cross streets as they will need to be evaluated and adjusted on an as need basis to improve the drainage on Wagon Trail Road. Additionally, stakeholders in the area should evaluate their individual property's drainage systems for deficiencies and low spots that can and will cause localized spot flooding independent of the Drainage District's or City's drainage systems. Long Term Recommendations The long term recommendation is to extend the current study into a Phase II Study focusing on the possibility of diverting some of the existing drainage areas away from the Wagon Trail ditch system and redirecting it to the Corrigan Creek By -Pass System. This will allow the team to reanalyze the capacity needs of the Wagon Trail ditch system and ultimately reduce any potential for future flooding. This study should look at the diversion of the drainage on Cantu, Ochoa, and Fite and the diversion of drainage on Hatfield and possibly from FM 518 into Corrigan Creek By -Pass. Should the Phase II Study confirm that diversions will provide needed relief to the Wagon Trail Ditch System then Phase III, which will be the design of the diversions identified in the Phase II Study, should be implemented. MBCO and IEA are pleased to provide the City of Pearland Public Works this report and should you have any questions or concerns please contact Brock Crenek, PE at brock.crenek@mbcoengineering.com or via phone at 832- 607-2047. Again thank you for the opportunity to help better the City of Pearland and we look forward to working with you in the future. EXHIBITS Exhibit 1— Culvert Flow Calculations Exhibit 2 — Drainage Area Map Exhibit 3 — RCP Installed Cost Estimate Exhibit 4 — HDPE Installed Cost Estimate 9 Exhibit D Wagon Trail Road Drainage Improvement from Bardet Road to the outfall at Fite Road Bridge Prepared By: Engineering and Project Department City of Pearland 3523 Liberty Dr Pearland, Texas 77581 November 5, 2014 Wagon Trail Drainage Improvement from Bardet Road to the outfall at Fite Road Bridge Introduction Wagon Trail between FM 518 and Fite Rd can divided into two segments in terms of drainage area boundary. Based on the survey, lidar, field visit and the drainage report titled "Wagon Trail Road Ditch Drainage Analysis" dated September 16, 2015 and prepared by MBCO Engineering, LLC , the area north of Bardet Rd drains into FM 518 roadside ditch whereas the area south of Bardet Rd drains into roadside ditch of Fite Rd through a 24" CMP across Wagon Trail. Based on the drainage report, discussion within the city as well as using engineering judgment, it will not be wise to initiate the drainage improvement on the north side of Bardet Rd without a good draiange master plan to take care of flooding issue near FM 518 as well as Cantu Road and Ocho Road. The city revisited the drainage report prepared by MBCO and revised the drainage calculation to design culvert size along Wagon Trail between Bardet Rd and Fite Rd. In addition, gis survey was done along Fite Rd between the Wagon Trail/ Fite Rd intersection and east outfall near the Fite Rd bridge. Findings: 1. Approximately 19.83 Acres of drainage area is draining into Fite Rd system from west side of Wagon Trail through a 24" CMP which is at the condition of failure due to corrosion and as well as silt deposit. 2. Approximately 24.76 Acres of drainage area is draining into Fite Rd system from east and west side of Wagon Trail from the intersection with culvert pipe as small as 18" diameter. 3. The existing pipe size varies between 15" diameters to 24" diameter with the some of the pipes installed reverse flow direction. Proposed Solutions: 1. The culvert size along east and west side Wagon Trail as well as north side of Fite Rd has been designed to handle 3 -year storm event. 2. Minimum pipe size is kept as 24" diameter to increase the capacity of the culvert. The culverts along north side of Fite Rd are designed as 36" diameter. 3. Majority of culvert size along west side of Wagon trail as well as the cross culvert across Wagon Trail has been increased to 30" diameter. Limitations: 1. Proposed recommendation will improve the drainage condition of the area but may not be able to flood proof the area as the system is designed for 3 -year storm event. It is expected to see some temporary ponding in the vicinity of drainage ditch during higher storm event (10 -year, 100- year and above). 1 Wagon Trail Drainage Calculation Based on MBCO Drainage Area divide version 9/16/2015 System D Total drainage area from D1 to D7 up to Fite Rd on east side Redirect drainage area B-15 to system D New Total Area Length of overland flow Length of ditch flow Overland Flow velocity Ditch flow velocity Time of concentration Rainfall intensity (3 -yr DD4 criteria) Runoff coefficient (from MBOC report) Peak discharge System C Total drainage area from C1 to C6 up to Fite Rd DA C-6 essentially flow south to north through 24" RCP. So, it is assumed to be a part of Fite Road North ditch system. MBCO's cal for DA C-6 appears to be erroneous (5.07 ac where as it should be about 1.5 AC) New Total Area Length of overland flow Length of ditch flow Overland Flow velocity Ditch flow velocity Time of concentration Rainfall intensity (3 -yr DD4 criteria) Runoff coefficient (from MBCO report) Peak discharge Routing of System C and System D Drainage Area Time of concentration (greater of Sys C and Sys D Rainfall intensity (3 -yr DD4 criteria) Runoff coefficient (large residential lot with roadway) Peak Discharge 4.28 AC 0.65 AC 4.93 AC 360 FT 950 FT 0.5 fps 1 fps 33.83 min 3.72 inch/hr 0.43 7.89 cfs 19.83 AC 19.83 AC 630 FT 950 FT 0.5 fps 1 fps 36.08 min 3.6 inch/hr 0.31 22.13 cfs 24.76 AC 36.08 min 3.6 inch/hr 0.35 31.198 cfs Estimate of Pipe Capacity for Wagon Trail Ditch Improvement D (ft) A R s Pipe Ca. Q 1.5 1.76715 0.375 0.0015 _ 4.08 2 3.1416 0.5 0.0015 9.52 2.5 4.90875 0.625 0.0015 15.93 3 7.0686 0.75 0.0015 25.90 1.5 1.76715 0.375 0.002 4.71 2 3.1416 0.5 0.002 10.99 2.5 4.90875 0.625 0.002 18.39 3 7.0686 0.75 0.002 29.91 1.5 1.76715 0.375 0.001 3.33 2 3.1416 0.5 0.001 7.77 2.5 4.90875 0.625 0.001 13.01 3 7.0686 0.75 0.001 21.15 Ditch Capacity W H 8 9 2.308391 3.029451 3.244954 3.664342 2.6655 3.498109 3.74695 4.231218 1.884793 2.473537 2.649494 2.991923 A P R s v Q 6 48 28 1.714286 0.001 5.609098 269.2367 4 36 26 1.384615 0.0009 4.260064 153.3623 H 2.5 Cd 0.64 D 0.5 A 0.19635 Q 1.593754 cfs Culvert Pipe Size Estimate for Wagon Trail Drainage Improvement System Pipe ID Pipe dia (inches) Actual Length (ft) Length to ordered (ft) D D1 24 30 30 D2 24 26 30 D3 24 26 30 D3A 24 25 30 D4 24 28 30 D5 24 28 30 D6 24 26 30 D6A 24 30 30 D7 24 25 30 C Cl 24 50 54 C2 24 55 30 C3 30 48 48 C4 30 _27 30 C5 30 39 42 E El 36 30 30 E2 36 33 36 E3 36 29 30 E4 36 29 30 E5 36 29 30 Across Wagon Trail 30 40 42 Total 24 349 354 30 154 162 36 150 156 653 672 Assumption: No replacement of the existing SET and 36" from SET to inlet. MBCO Engineering, LLC. MOSS l BLETSCH I CRENEK (OILER Table 2 - Summary of Peak Discharges 3 -Year Storm Event IEA CULVERT ID CUMULATIVE AREA (ac) TC (minutes) CUMULATIVE C VALUE INTENSITY (in/hr) CUMULATIVE DISCHARGE (cfs) DITCH A A-1 14.02 39.36 0.66 3.36 31.09 A-2 13.77 38.09 0.66 3.42 31.08 A-3 12.7 35.98 0.65 3.53 29.14 A-4 11.94 34.55 0.64 3.61 27.59 A-5 11.11 32.98 0.62 3.71 25.56 A-6 10.65 32.1 0.61 3.76 24.43 A-7 10.11 31.04 0.6 3.83 23.23 A-8 8.64 29.04 0.56 3.96 19.16 A-9 6.21 26.87 0.45 4.13 11.54 A-10 5.51 25.57 0.41 4.23 9.56 A-11 4.22 24.13 0.41 4.35 7.53 A-12 1.4 20 0.41 4.75 2.73 DITCH B B-1 21.16 35.52 0.47 3.56 35.73 B-2 21.06 34.54 0.47 3.61 35.73 8-3 20.77 33.73 0.47 3.66 35.73 B-4 20.4 32.72 0.47 3.72 35.67 B-5 19.85 31.19 0.46 3.82 34.88 8-6 19.55 30.34 0.46 3.87 34.80 B-7 17.11 29.22 0.46 3.95 31.09 B-8 14.1 27 0.45 4.12 26.14 8-10 7.88 24.95 0.42 4.28 14.17 B-11 1.22 22.65 0.46 4.49 2.52 B-12 1.07 20.88 0.45 4.66 2.24 B-13 0.98 19.74 0.45 4.78 2.11 8-14 0.87 18.37 0.45 4.94 1.93 8-15 0.65 15 0.43 5.37 1.50 DITCH C C-18 50.02 65.59 0.34 2.46 41.84 C-17 40.35 60.7 0.35 2.58 36.44 C-16 39.44 60.1 0.35 2.6 35.89 C-15 38.24 59.21 0.34 2.63 34.19 C-14 33.74 57.33 0.34 2.69 30.86 C-13 33.61 56.86 0.34 2.69 30.74 C-12 33.43 56.36 0.34 2.71 30.80 C-11 32.62 54.62 0.33 2.76 29.71 C-10 31.11 52.02 0.33 2.85 29.26 C-9 25.97 49.45 0.32 2.93 24.35 C-8 21.05 47.74 0.32 3 20.21 C-7 20.62 46.6 0.32 3.04 20.06 C-6 19.83 44.52 0.31 3.12 19.18 C-5 17.53 43.04 0.31 3.19 17.34 C-4 15.12 40.67 0.3 3.29 14.92 4 MBCOjEngineering, LLC. MOSS BLETSCH CRENEK OLLER Table 2 - Summary of Peak Discharges Cont.) IEA CULVERT ID CUMULATIVE AREA (ac) TC (minutes) CUMULATIVE C VALUE INTENSITY (in/hr) CUMULATIVE DISCHARGE (cfs) DITCH C C-3 12.32 35 0.28 3.59 12.38 C-2 11.95 33.61 0.27 3.67 11.84 C-1 5.07 33 0.33 3.7 6.19 DITCH D 0-24 23.91 52.99 0.43 2.81 28.89 0-23 21.41 50.03 0.44 2.91 27.45 D-22 20.54 48.6 0.45 2.97 27.45 0-21 20.05 47.73 0.45 3 27.07 D-20 19.67 47.09 0.45 3.02 26.73 D-19 18.43 44.84 0.45 3.11 25.79 0-18 17.11 44.17 0.45 3.14 24.18 D-17 14.46 43.3 0.46 3.18 21.15 D-16 13.34 39.88 0.47 3.33 20.88 0-15 12.45 38.86 0.47 3.38 19.78 0-14 10.08 36.37 0.46 3.51 16.28 0-13 8.64 34.91 0.39 3.59 12.10 D-12 6.8 32.56 0.38 3.73 9.64 D-11 4.73 30.72 0.39 3.85 7.10 D-10 4.57 29.27 0.39 3.95 7.04 D-9 4.46 28.24 0.38 4.02 6.81 D-7 4.28 26.63 0.38 4.14 6.73 D-6 3.99 24.51 0.38 4.32 6.55 0-5 3.04 22.3 0.37 4.52 5.08 0-4 2.39 19.78 0.36 4.78 4.11 D-3 1.99 18.19 0.35 4.96 3.45 D-2 1.55 16.55 0.34 5.16 2.72 0-1 0.96 15 0.41 5.37 2.11 5 MBCO Engineering, LLC. MOSS I BLETSCH CRENEK OLLER Table 3 - Summary of Driveway Culverts 3 -Year Storm Event IEA CULVERT ID STATION CUMULATIVE AREA (ac) CUMULATIVE DISCHARGE (cfs) CULVERT N -VALUE CULVERT SLOPE (FT/FT) CULVERT QUANTITY PIPE DIAMETER (FT) CULVERT CAPACITY (CFS) DITCH A A-1 0+71.30 14.02 31.09 0.013 0.002 4 2 40.58 A-2 1+86.41 13.77 31.08 0.013 0.002 4 2 40.58 A-3 3+76.74 12.7 29.14 0.013 0.002 3 2 30.43 A-4 5+03.44 11.94 27.59 0.013 0.002 3 2 30.43 A-5 6+40.74 11.11 25.56 0.013 0.002 3 2 30.43 A-6 7+16.72 10.65 24.43 0.013 0.002 3 2 30.43 A-7 8+06.51 10.11 23.23 0.013 0.002 3 2 30.43 A-8 9+69.38 8.64 19.16 0.013 0.002 2 2 20.29 A-9 11+22.78 6.21 11.54 0.013 0.002 2 2 20.29 A-10 12+09.04 5.51 9.56 0.013 0.002 1 2 10.14 A-11 13+04.16 4.22 7.53 0.013 0.002 1 2 10.14 A-12 15+14.64 1.4 2.73 0.013 0.002 1 1.5 4.71 DITCH B 8-1 2+56.68 21.16 35.73 0.013 0.002 4 2 40.58 8-2 3+47.56 21.06 35.73 0.013 0.002 4 2 40.58 B-3 4+23.82 20.77 35.73 0.013 0.002 4 2 40.58 B-4 5+18.42 20.4 35.67 0.013 0.002 4 2 40.58 B-5 6+61.02 19.85 34.88 0.013 0.002 4 2 40.58 B-6 7+41.12 19.55 34.80 0.013 0.002 4 2 40.58 B-7 8+42.49 17.11 31.09 0.013 0.002 4 2 40.58 B-8 10+37.53 14.1 26.14 0.013 0.002 3 2 30.43 8-10 11+83.87 7.88 14.17 0.013 0.002 2 2 20.29 8-11 12+98.95 1.22 2.52 0.013 0.002 1 1.5 4.71 B-12 13+83.95 1.07 2.24 0.013 0.002 1 1.5 4.71 B-13 14+39.05 0.98 2.11 0.013 0.002 1 1.5 4.71 8-14 15+03.25 0.87 1.93 0.013 0.002 1 1.5 4.71 8-15 16+45.72 0.65 1.50 0.013 0.002 1 1.5 4.71 DITCH C C-18 46+42.00 50.02 41.84 0.013 0.002 5 2 50.72 C-17 41+85.88 40.35 36.44 0.013 0.002 4 2 40.58 C-16 41+30.16 39.44 35.89 0.013 0.002 4 2 40.58 C-15 40+47.45 38.24 34.19 0.013 0.002 4 2 40.58 C-14 38+78.55 33.74 30.86 0.013 0.002 4 2 40.58 C-13 38+35.49 33.61 30.74 0.013 0.002 4 2 40.58 C-12 37+90.60 33.43 30.80 0.013 0.002 4 2 40.58 6 MBCO Engineering, LLC. MOSS 1 BLETSCH , CRENEK OLLER Table 3 - Summary of Driveway Culverts (Cont.) IEA CULVERT ID STATION CUMULATIVE AREA (ac) CUMULATIVE DISCHARGE (cfs) CULVERT N -VALUE CULVERT SLOPE (FT/FT) CULVERT QUANTITY PIPE DIAMETER (FT) CULVERT CAPACITY (CFS) DITCH C C-11 36+34.10 32.62 29.71 0.013 0.002 3 2 30.43 C-10 34+00.40 31.11 29.26 0.013 0.002 3 2 30.43 C-9 31+79.06 25.97 24.35 0.013 0.002 3 2 30.43 C-8 30+38.19 21.05 20.21 0.013 0.002 2 2 20.29 C-7 28+95.73 20.62 20.06 0.013 0.002 2 2 20.29 C-6 27+25.87 19.83 19.18 0.013 0.002 2 2 20.29 C-5 26+12.93 17.53 17.34 0.013 0.002 2 2 20.29 C-4 24+32.73 15.12 14.92 0.013 0.002 2 2 20.29 C-3 20+10.61 12.32 12.38 0.013 0.002 2 2 20.29 C-2 19+09.14 11.95 11.84 0.013 0.002 2 2 20.29 C-1 18+52.08 5.07 6.19 0.013 0.002 2 1.5 9.42 DITCH D D-24 46+73.25 23.91 28.89 0.013 0.002 3 2 30.43 D-23 44+08.76 21.41 27.45 0.013 0.002 3 2 30.43 D-22 42+84.31 20.54 27.45 0.013 0.002 3 2 30.43 D-21 42+07.88 20.05 27.07 0.013 0.002 3 2 30.43 D-20 41+51.61 19.67 26.73 0.013 0.002 3 2 30.43 D-19 39+55.38 18.43 25.79 0.013 0.002 3 2 30.43 D-18 38+97.67 17.11 24.18 0.013 0.002 3 2 30.43 D-17 38+25.10 14.46 21.15 0.013 0.002 3 2 30.43 D-16 35+40.85 13.34 20.88 0.013 0.002 3 2 30.43 D-15 34+57.63 12.45 19.78 0.013 0.002 2 2 20.29 D-14 32+65.31 10.08 16.28 0.013 0.002 2 2 20.29 D-13 31+56.57 8.64 12.10 0.013 0.002 2 2 20.29 0-12 29+96.84 6.8 9.64 0.013 0.002 2 1.5 9.42 D-11 28+80.51 4.73 7.10 0.013 0.002 2 1.5 9.42 D-10 27+90.61 4.57 7.04 0.013 0.002 2 1.5 9.42 D-9 27+27.81 4.46 6.81 0.013 0.002 2 1.5 9.42 D-7 26+23.00 4.28 6.73 0.013 0.002 2 1.5 9.42 0-6 24+89.15 3.99 6.55 0.013 0.002 2 1.5 9.42 0-5 22+90.28 3.04 5.08 0.013 0.002 2 1.5 9.42 D-4 21+52.49 2.39 4.11 0.013 0.002 1 1.5 4.71 D-3 20+67.51 1.99 3.45 0.013 0.002 1 1.5 4.71 0-2 19+61.06 1.55 2.72 0.013 0.002 1 1.5 4.71 0-1 18+60.24 0.96 2.11 0.013 0.002 1 1.5 7 4.71 7 z 1 inch = 400 feet LEGEND I DRAINAGE BOUNDARY FLOW DIRECTION STREAM IEA ELEVATIONS -54 so 8571 IR 47 7143 - 445714 41 4288 - 382857 - 35 1429 - 32 1225 MORT11 LOOP WEST, SUITE 32$ 110987011. TX 77005 !32-166.3100 new ligaornomo“ WAGON TRAIL DRAINAGE ANALYSIS IEA No. 2026 AUGUST 2010 EXHIBIT 2 I 1 :1 • Profile View of Fite Rd StoGDn b 9 rS r A tet'—*i%?E.....� L -i.. J-. l.. 4.7- Y 1 _ �.L., 17-..4...4 u. . `. .. ° „ .q Y .�.t . . . .. .. .. .. C.ly of Peorlo.0. Te.os ROAD p [1fiTE 0000 WATR00 CAI.10 EAST 0100E X1! 9 3{ I I- rn :'iS Profile View of Wagon Trait Rood (East Di;c'.) Station —_� I _ , rr (W esL Citcf r "'^ - - - - ' - - - ,..:Y of ?CGrono. Te os AGON RAI S REGnE R ROOM BMOC ROOM B4ROET ST TO !iE RD `.1r�` 1 a we wr w« »+s wA »..• wr wr w.r rw r.a a.a as r.a ... A.. .... ... ,•'m —. ... ... ,..,. ... ... �.. ,... �.... ... .'"'• RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Exhibit E November 20, 2015 City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Tel: 281.625.1641 pearlandtx.gov Mona and Sergio Chavaria A & A Cleaning Services 2810 Wagon Trail Road Pearland, TX 77584 Dear Mr. & Mrs. Chavaria: Beginning the week of November 23, 2015, the City of Pearland will commence a ditch and culvert maintenance project along Wagon Trail Road and Fite Road with preliminary preparation currently underway. Ditches will be regraded and culverts replaced along the east and west sides of Wagon Trail Road between Bardet Road and Fite Road as well as the north side of Fite Road from Wagon Trail Road to the Corrigan Diversion ditch. In addition to the ditch/culvert work, a damaged culvert at the intersection of Wagon Trail Road and Fite Road will be replaced requiring periodic road closures and detours. Several of the culverts will be up-sized to allow flow for a 3 -year storm design which is the City's standard on residential streets. Weather permitting, this work should be completed by December 318t. This work should allow for improved conveyance of storm water in the immediate area around Wagon Trail Road and Fite Road. The maintenance work and basic improvements that we have and are undertaking with our operations staff is of scope within the existing public right-of-way to improve drainage without causing unintended negative consequences. However, what we are going to undertake this year is not a solution to the flooding that you have been experiencing on your property further to the north. Properties with localized water during intense rainfalls may still have episodes, particularly for properties that have additional impervious surfaces or grades below roadways. As we have shared, you can continue to review your options for stormwater management on your property with whatever professional design assistance you deem appropriate. The City is in the process of preparing a City-wide Master Drainage Plan. As a part of this plan, your neighborhood will be studied and potential drainage solutions will be identified. Staff will utilize this information to develop and prioritize future Capital Improvement projects. RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE - If you have any questions, please contact me at 281-652-1641 or spolka@nearlandtx.eov. Sincerely, Susan Polka, P.E. Director of Engineering Cc: Trent Epperson, Asst. City Manager Mike Leech, Asst. Public Works Director Andrea Broughton, Brazoria County Drainage District #4 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE November 20, 2015 City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Tel: 281.625.1641 pearlandtx.gov Sandy and Roland Cavazos A -Better Plumbing 5828 W. Broadway Street Pearland, TX 77581 Dear Mr. & Mrs. Cavazos: Beginning the week of November 23, 2015, the City of Pearland will commence a ditch and culvert maintenance project along Wagon Trail Road and Fite Road with preliminary preparation currently underway. Ditches will be regraded and culverts replaced along the east and west sides of Wagon Trail Road between Bardet Road and Fite Road as well as the north side of Fite Road from Wagon Trail Road to the Corrigan Diversion ditch. In addition to the ditch/culvert work, a damaged culvert at the intersection of Wagon Trail Road and Fite Road will be replaced requiring periodic road closures and detours. Several of the culverts will be up-sized to allow flow for a 3 -year storm design which is the City's standard for residential streets. Weather permitting, this work should be completed by December 31st. This work should allow for improved conveyance of storm water in the immediate area around Wagon Trail Road and Fite Road. The maintenance work and basic improvements that we have and are undertaking with our operations staff is of scope within the existing public right-of-way to improve drainage without causing unintended negative consequences. However, what we are going to undertake this year is not a solution to the flooding that you have been experiencing on your property further to the north. Properties with localized water during intense rainfalls may still have episodes, particularly for properties that have additional impervious surfaces or grades below roadways. As we have shared, you can continue to review your options for stormwater management on your property with whatever professional design assistance you deem appropriate. The City is in the process of preparing a City-wide Master Drainage Plan. As a part of this plan, your neighborhood will be studied and potential drainage solutions will be identified. Staff will utilize this information to develop and prioritize future Capital Improvement projects. RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUN-!ABLE If you have any questions, please contact me at 281-652-1641 or spolka@pearlandtx.gov. Sincerely, Susan Polka, P.E. Director of Engineering Cc: Trent Epperson, Asst. City Manager Mike Leech, Asst. Public Works Director Andrea Broughton, Brazoria County Drainage District #4