Loading...
R-2015-226 2015-12-07 RESOLUTION NO. R2015-226 A Resolution of the City Council of the City of Pearland,Texas, renewing a unit supply contract for water fittings and related parts to HD Supply Waterworks, in the estimated amount of $200,000, beginning December 14, 2015 through December 13, 2016. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City previously awarded a supply contract for water fittings and related parts. Section 2. That the City Council hereby renews a contract with HD Supply Waterworks, in the unit price amount reflected in Exhibit"A" attached hereto. Section 3. The City Manager or his designee is hereby authorized to execute a supply contract for water fittings and related parts. PASSED, APPROVED and ADOPTED this the7th day of December, A.D., 2015. tiYl'f TOM REID MAYOR ATTEST: u,,,' • Y NG LO I T v _ I SEC ARY •. . APPROVED AS TO FORM: a-- - Q DARRIN M. COKER CITY ATTORNEY RESOLUTION NO. R2015-226 Exhibit "A" EXHIBIT A BID #0914-61 PURCHASE OF FITTINGS VALVES AND COUPLINGS 1 of 7 Bid #0914-61 HD Supply Waterworks Description Mfgr MfgNo UOM QTY Unit Extended SEC 13 CURB STOPS AND BRASS CTS FITTINGS 13.1 3/4 IN. CTS X 3/4 M/NUT FORD B43 -232W EA 48 $32.30 $1,550.40 13.2 1 IN. CTS X 3/4 M/NUT FORD B43 -334W EA 144 $53.50 $7,704.00 13.3 1 IN. CTS X 1 IN. M/NUT FORD B43 -444W EA 144 $73.20 $10,540.80 13.4 3/4 IN. FIP X FIP FORD B11-333 EA 48 $38.40 $1,843.20 13.5 1 IN. FIP X FIP FORD B11-344 EA 24 $42.70 $1,024.80 13.6 3/4 IN. CTS X 3/4 IN. M/NUT 90 FORD B43 -232W EA 24 $31.90 $765.60 13.7 1 IN. CTS X 3/4 M/NUT 90 FORD B43 -242W EA 48 $41.10 $1,972.80 13.8 1 IN. CTS X 1 IN. M/NUT 90 FORD B43 -344W EA 24 $64.80 $1,555.20 13.9 3/4 IN. FIP X 3/4 IN. METER NUT (ANGLE 90 DEG) FORD B13 -232W EA 24 $27.10 $650.40 13.10 3/4 IN. FIP X 3/4 IN. METER NUT (STRAIGHT) FORD B13 -232W EA 24 $26.80 $643.20 13.11 1 IN. FIP X 1 IN. METER NUT (ANGLE 90 DEG) FORD B13 -344W EA 12 $54.50 $654.00 13.12 1 IN. FIP X 1 IN. METER NUT (STRAIGHT) FORD B13 -344W EA 12 $48.00 $576.00 13.13 2 IN. PJ -CTS X FLANGE FORD BF43-777W EA 12 $221.80 $2,661.60 13.14 2 IN. PJ -CTS X FLANGE 90 DEG FORD FV43-777W EA 12 $173.90 $2,086.80 13.15 1-1/2 IN. FLANGE X CTS FORD BF43-666W EA 6 $130.90 $785.40 SECTION 13 TOTAL $35,014.20 SEC 14 U -BRANCH ASSEMBLY 14.1 1 IN. PJ -CTS X 3/4 IN. METER NUT (STRAIGHT) FORD UVBS43 EA 144 $88.00 $12,672.00 14.2 1 IN. PJ -CTS X 3/4 IN. METER NUT (ANGLED) FORD UVB43 EA 144 $92.60 $13,334.40 14.3 3/4 IN. CTS UNION FORD C44-33 EA 144 $13.10 $1,886.40 14.4 3/4 IN. CTS X 3/4 IN. PVC UNION FORD C47-33 EA 12 $17.70 $212.40 14.5 3/4 IN. INSTA TITE COUPLING FORD C44 -33 -U -NL EA 144 $13.10 $1,886.40 14.6 1 IN. CTS UNION 90 FORD L44-44 EA 24 $21.70 $520.80 1 of 7 Bid #0914-61 1 HD Supply Waterworks Description Mfgr MfgNo UOM QTY Unit Extended 14.7 1 IN. CTS X 3/4 IN. CTS UNION FORD C44-34 EA 24 $15.20 $364.80 14.8 1 IN. CTS UNION FORD C44-44 EA 144 $15.00 $2,160.00 14.9 1 IN. CTS X 1 IN. PVC UNION FORD C47-44 EA 12 $25.60 $307.20 14.10 1 IN. PVC UNION FORD C77-44 EA 12 $32.50 $390.00 14.11 1 IN. INSTA TITE COUPLING FORD C44 -44 -U -NL EA 144 $15.00 $2,160.00 14.12 1-1/2 IN. CTS UNION FORD C44-66 EA 6 $50.20 $301.20 14.13 2 IN. CTS UNION FORD C44-77 EA 12 $67.70 $812.40 14.14 2 IN. CTS UNION 90 FORD L44-77 EA 24 $141.40 $3,393.60 14.15 1 IN. CC X 1 IN. CTS CORP FORD F1000 -4 -NL EA 288 $35.50 $10,224.00 14.16 2 IN. CC X 2 IN. CTS CORP FORD FB1000-7 EA 24 $169.00 $4,056.00 14.17 3/4 IN. X 3/4 IN. X 3/4 IN. PJ -CTS (TEE) FORD T444-333 EA 2 $31.00 $62.00 14.18 1 IN. X 1 IN. X 3/4 IN. PJ -CTS (TEE) FORD T444-443 EA 2 $34.15 $68.30 14.19 1 IN. X 1 IN. X 1 IN. PJ -CTS (TEE) FORD T444-444 EA 2 $33.20 $66.40 14.20 1 IN. X 3/4 IN. X 3/4 IN. PJ - CTS (WYE) FORD Y44-243 EA 2 $27.10 $54.20 14.21 1-1/2 IN. FLANGE (BRASS) FORD CF31-66 EA 6 $31.10 $186.60 14.22 2 IN. FLANGE (BRASS) FORD CF31-77 EA 24 $40.60 $974.40 14.23 3/4 IN. SPUDS FORD C38-13-2.188 EA 144 $7.70 $1,108.80 14.24 1 IN. SPUDS FORD C38-44-2 EA 144 $10.40 $1,497.60 14.25 3/4 IN. X 2-1/2 IN. SPUDS FORD C38-23-2.5 EA 12 $7.00 $84.00 14.26 3/4 IN. X 3 IN. SPUDS FORD C38-23-3 EA 12 $8.40 $100.80 14.27 3/4 IN. X 8-1/2 N. SPUDS FORD C38-23-8.5 EA 12 $18.00 $216.00 SECTION 14 TOTAL $59,100.70 SEC 15 METER RISERS 15.1 3/4 IN. 7 IN. FORD EA 4 $65.90 $263.60 15.2 3/4 IN. 9 IN. FORD EA 4 $66.70 $266.80 15.3 3/4 IN. 15 IN. FORD 2 of 7 EA 4 $71.90 $287.60 1 3 of 7 Bid #0914-61 HD Supply Waterworks Description Mfgr MfgNo UOM QTY Unit Extended 15.4 1 IN. 9 IN. FORD EA 4 $125.00 $500.00 15.5 1 IN. 15 IN FORD EA 4 $132.00 $528.00 SECTION 15 TOTAL $1,846.00 SEC 17 BRASS ADAPTERS 17.14 1 IN. X 3/4 IN. METER NUT ADAPTER FORD EA 6 $17.80 $106.80 17.22 2 IN. FIP X PVC COMP FORD C07-77 EA 6 $79.60 $477.60 SECTION 17 TOTAL $584.40 SEC 20 TAPPING SADDLES 20.1 2 X 1 CC ROMAC IND. EA 4 $18.40 $73.60 20.2 2-1/2 X 1 CC ROMAC IND. EA 2 $18.40 $36.80 20.3 3 X 1 CC ROMAC IND. EA 2 $18.90 $37.80 20.4 4 X 1 CC ROMAC IND. EA 2 $19.95 $39.90 20.5 4 X 2 CC ROMAC IND. EA 2 $25.05 $50.10 20.6 4 X 2 IP ROMAC IND. EA 6 $25.05 $150.30 20.7 6 X 1 CC ROMAC IND. EA 12 $23.15 $277.80 20.8 6 X 2 CC ROMAC IND. EA 12 $27.20 $326.40 20.9 6 X 2 IP ROMAC IND. EA 4 $27.20 $108.80 20.10 8 X 1 CC ROMAC IND. EA 24 $27.50 $660.00 20.11 8 X 2 CC ROMAC IND. EA 12 $32.80 $393.60 20.12 8 X 2 IP ROMAC IND. EA 2 $32.80 $65.60 20.13 10 X 1 CC ROMAC IND. EA 12 $30.50 $366.00 20.14 10 X 2 CC ROMAC IND. EA 12 $37.30 $447.60 20.15 10 X 2 IP ROMAC IND. EA 2 $37.30 $74.60 20.16 12 X 1 CC ROMAC IND. EA 12 $35.30 $423.60 20.17 12 X 2 CC ROMAC IND. EA 12 $43.35 $520.20 3 of 7 Bid #0914-61 ITEMS BELOW WERE ON PREVIOUS CONTRACT AND WILL NOT BE RENEWED SE -G4 HD Supply Waterworks Description Mfgr MfgNo UOM QTY Unit Extended 20.18 12 X 2 IP ROMAC IND. 96 EA 2 $43.35 $86.70 20.19 16 X 1 CC ROMAC IND. EA EA 6 $87.95 $527.70 20.20 16 X 2 CC ROMAC IND. EA EA 12 $96.00 $1,152.00 20.21 16 X 2 IP ROMAC IND. EA 2 $96.00 $192.00 SECTION 20 TOTAL 2 IN. C.I. RISER EJIW OLD CASTLE E-A 48 $6,011.10 $1.540.80 7.6 3 IN. C.I. RISER E EA SEC 31 MISCELLANEOUS SUPPLIES $345.00 7.7 4 IN. C.I. RISER EJIW OLD CASTLE 31.1 "T PLUS 2 TEFLON PASTE. 1/2 PINT CANS" $77.40 $464.40 EA 48 $11.00 $528.00 SECTION 31 TOTAL 6 $9440 $564.60 7-,S $528.00 ITEMS BELOW WERE ON PREVIOUS CONTRACT AND WILL NOT BE RENEWED SE -G4 24-IN.-GOLF€R 7.1 COVE EJIW OLD CASTLE EA 96 $71.05 $6820.80 7=2 AN4=1-RIN-G-1N4F-L-A-T-EiASE EJIW Oi D (A STT E EA 48 $4-02.80 $4896_O 7- EJIW OLD CASTLE EA 48 $442,00 $6,846.041 7.4 EJIW OLD CASTLE EA 1-2 $71-:05 $452,60 7.5 2 IN. C.I. RISER EJIW OLD CASTLE E-A 48 $3240 $1.540.80 7.6 3 IN. C.I. RISER E EA 6 $57:50 $345.00 7.7 4 IN. C.I. RISER EJIW OLD CASTLE EA 6 $77.40 $464.40 7,8 6 IN. C.I. RISER EJIW OLD CASTLE EA 6 $9440 $564.60 7-,S e, _ • E IW Oi D ( A CTI E EA 48 $48:80 $902.40 _ _ - 7.10 • e ' , R EJIW OLD CASTLE EA 48 $2 30 $974.40 - . _ _ _ 7 4 IN. CONCRETE RISER EJIW OLD CASTLE E-A 48 $24-28 X61-:60 742 6-4N. CONCRETERISER EJIW-OLD-CASTLE EA 48 $28.50 $1,368.00 $26,706,60 SEC -8 8-7 - ` EJIW Oi D C ST- E4 of 7 EA 48 $23=88 g$ 4% _e...., - 1 5 of 7 Bid #0914-61 HD Supply Waterworks Description Mfgr MfgNo UOM QTY Unit Extended 8.10 6 IN. CONCRETE RISES EJIW OLD CASTLE EA 6 $36.70 $220.20 $162-:60 S€C-40 ST-AINLESS-STYE€L- -BAND- 4114 18 IN. STAINLESS STEEL EA 24 $4-.-0 $45.50 10.2 24 IN. STAINLESS STEEL EA 24 $2.4-5 $54.60 10.3 STEEL EA 72 $2,50 $1-80.00 $277.20 $277.20 SEC 11 41:-24 7.05 X 7.45 X 15 6 IN. FORD FSI 745X15 EA 4-2 $83.40 $14100.80 ROUGH L $- 000.80 SE-C-23 23-8 2 1/2 IN. 22 1/2 DEG SOLVENT WELD LASCO EA 2 $2240 $4400 2348 4 IN. 22 1/2 DEG SOLVENT LASCO EA 2 $4105 $82:40 WELD 23.22 P. LASCO EA 2 $55.70 $111.40 _ _• WELD 23.25 6 IN. UNFLANGESOLVENi - LASCO EA 2 $24.7-0 $49.40 WELD SECTION-23 TOTAL $286.90 SEC 25 ONE-LACKS 2-54 2 IN. SIP EA 4 $46,80 $6720 X5.2 34N, SIP E-A 4 $-1-6.80 $6720 25.3 44N SIP EA 4-2 $4-840 $247,20 25.4 6-4I4: SIP E-A 4-2 $24=90 $262:80 25.5 84N, SIP EA 24 $32-:40 $7-7-7.60 25-6 10 IN. SIP EA 4-2 $64-:30 $73560 25.7 12 IN. SIP EA 4-2 $64-50 $774.00 25-8 4-6-1-N, SIP EA 4-2 $1-37,90 $4,654,80 26-9 20 IN. SIP €A 4- $242:00 $24-2-:00 2540 24 IN. SIP EA 1- $24500 $24580 25.11 30-IN, SIP EA 1- $62400 $62400 4- $5;637.40 SEG 26 PIPE RESTRAINTS 26.1 3 IN. SIGMA EA 2 $26.80 $53.60 SEG 28 VArVES_AL i ROIT- SHALL BE-STAINLESS STEEL= Awad to-#B 5 of 7 Bid #0914-61 (3of7 Bid #0914-61 HD Supply Waterworks Description Mfgr MfgNo UOM QTY Unit Extended 28.1 FF KUPFERLE EA 24 $360.00 $8,640.00 VALVE 28.2 GATE VALVE AMERICAN- DARLING EA 24 $204-00 $47824.00 28.3 2 IN. IPS BRASS GATE VALVE AMERIGAN- DARLING EA 24 $28,36 $680.40 28.4 4 IN. PUSH ON RS GATE AMERICAN- DARLING EA 2 $338.80 $678.00 • • - e• ' • • - 28-5 . - ' - • - • • AMERICAN- DARLING EA 2 $330:$0 $660.-00 28:6 6 IN. PUSH ON RS GATE VALVE WITH OPERATING AMERICAN- DARLING EA 12 $446.00 $5,352.00 28.7 6 IN. MJ RSW GATE VALVE AMERICAN- DARLING EA 12 $421.00 $5,052.00 288 V • • - V' . • • - AMERICAN- DARLING EA 2 $678.00 $1,356.00 284) 8 . ' ' • • AMERICAN- MERICAN-28 EA 2 $671:00 $1442.00 DARLING _ - - 28.10 10 IN. PUSH ON RS GATE AMERICAN DAR-UN-6 EA 2 $4,095.00 $2,-90.00 • ! ' ' • • - 28.11 ! • ' • • AMERICAN- DARLING EA 2 $1,04680 $2,042,00 - - - 28.12 12 IN. PUSH ON RS GATE VALVE WITH OPERATING AMERICAN- DARLING EA 2 $1,372,08 $2;744:00 28.13 5... ' •. " AMERICAN- DARLING EA 2 $4,32400 $2,648.00 - -' 28.14 AMERICAN DARLING EA 4 $4,438-A0 $17,752.84 WITH OPERATING-NUS AN-D EARS SEC-TION 28-TOTAL 4 $56;$10:40 SEC 29 MAI -FITTINGS 28-3 8" X 2" MJ REDUCER SIGMA EA 6 $56.30 $33740 SEC- 30 €-IRE-HY-DRAM-TS- R THIS- COAf STORZ-FITTING WITH -AND- CHAIN. ALI BOOL_I TCTC PROVIDED WITH ITEMS SHALL-BE-STAINLESS- STEL (3of7 Bid #0914-61 7 of 7 Bid #0914-61 HD Supply Waterworks Description Mfgr MfgNo UOM QTY Unit Extended 30.-1 4 F T . AMERICAN € A 20 $1,740:O0 $34888.88 DARLING, MUELLER. EAST 3O 2- 5-F- AMERICAN- DAR1 ING, EA 20 X1418-08 $36,280.80 MUELLER, EAST 30.3 6 FT. AMERICAN DARLING, MUELLER, EAST EA 8 $1,88880 $15440.00 WORI4S4E—IIW-) SECTION 30 TOTAL $86,840:88 SEC-33 VALVE-BOXES 334 18 IN. X 21 IN. SIGMA EA 48 $24.20 $4,141,68 33-2 24-IN. X 364N. SIGMA EA 48 $34,70 $4,66-540 33, 36 IN. X-484N SIGMA Ems-! 48 $55:50 $2-;66408 3,34 48-IN--X IN: SIGMA EA 48 $67-40 $3,235.20 33-5 LIDS WATER SIGMA EA 22 $9,50 $205.00 336 LIDS SEWER SIGMA EA 48 $9.50 $456:80 33.- 1 IN. RISERS SIGMA EA 141 $385 $568:80 33-8 2 IN. RISERS SIGMA EA 444 $8:40 $1-,209.60 334 1-IN. RISERS SIGMA EA 7-2 $11.50 $828.00 3340 6-IN. RISERS SIGMA EA 72 $1780 60 $4,284,60 1 $43,27-9-.40 7 of 7 Bid #0914-61 City of Pearland 3519 Liberty Drive Pearland, TX 77581 Resolution No. R2015-226 Exhibit "A" General Services Contract This Contract (Contract) is made between the City of Pearland, Texas (City), and Contractor. The City and Contractor agree to the terms and conditions of this Contract, which consists of the following parts: I. Summary of Contract Terms II. Signatures III. Standard Contractual Provisions IV. Special Terms and Conditions V. Additional Contract Attachments I. Summary of Contract Terms. Contractor: Description of Services: Contract Amount: Effective Date: Termination Date: Renewal: HD Supply Waterworks 7022 Easthaven Houston, TX 77017 Contractor will provide water fittings and related parts, per the specifications and amended item list of City of Pearland bid #0914- 61; City Council Resolution #R2015-226. $200,000 estimated 12/14/2015 12/13/2016 First of two renewal options 11. Signatures. By signing below, the parties agree to the terms of this Contract: CITY OF PELAND* using � ' AS - Sign -Thy: Date: %/ City Manager Assistant City Manager Director Program Manager *Contract Signature Authority: Date CONTRACTOR: Titled �1.4 7VA �' C=-7 Date: - Program Manager -$5,999 or Tess Director - $6,000 to $30,000 City Manager/Assistant City Managers - $30,001 to $50,000 City Council Resolution - $50,000+ III. Standard Contractual Provisions. A. Definitions. Contract means this Standard Services Contract. Services means the services for which the City solicited bids or received proposals as described in Exhibit A, attached hereto. B. Services and Payment. Contractor will fumish Services to the City in accordance with the terms and conditions specified in this Contract. Contractor will bill the City for the Services provided at intervals of at least 30 days, except for the final billing. The City shall pay Contractor for the Services in accordance with the terms of this Contract, but all payments to be made by the City to Contractor, including the time of payment and the payment of interest on overdue amounts, are subject to the applicable provisions of Chapter 2251 of the Government Code. C. Termination Provisions. (1) City Termination for Convenience. Under this paragraph, the City may terminate this Contract during its term at any time for the City's own convenience where the Contractor is not in default by giving written notice to Contractor. If the City terminates this Contract under this paragraph, the City will pay the Contractor for all services rendered in accordance with this Contract to the date of termination. (2) Termination for Default. Either party to this Contract may terminate this Contract as provided in this paragraph if the other party fails to comply with its terms. The party alleging the default will give the other party notice of the default in writing citing the terms of the Contract that have been breached and what action the defaulting party must take to cure the default. If the party in default fails to cure the default as specified in the notice, the party giving the notice of default may terminate this Contract by written notice to the other party, specifying the date of termination. Termination of this Contract under this paragraph does not affect the right of either party to seek remedies for breach of the Contract as allowed by law, including any damages or costs suffered by either party. (3) Multi -Year Contracts and Funding. If this Contract extends beyond the City's fiscal year in which it becomes effective or provides for the City to make any payment during any of the City's fiscal years following the City's fiscal year in which this Contract becomes effective and the City fails to appropriate funds to make any required Contract payment for that successive fiscal year and there are no funds from the City's sale of debt instruments to make the required payment, then this Contract automatically terminates at the beginning of the first day of the City's successive fiscal year of the Contract for which the City has not appropriated funds or otherwise provided for funds to make a required payment under the Contract. D. Liability and Indemnity. Any provision of any attached contract document that limits the Contractor's liability to the City or releases the Contractor from liability to the City for actual or compensatory damages, loss, or costs arising from the performance of this Contract or that provides for contractual indemnity by one party to the other party to this Contract is not applicable or effective under this Contract. Except where an Additional Contract Document provided by the City provides otherwise, each party to this Contract is responsible for defending against and liable for paying any claim, suit, or judgment for damages, loss, or costs arising from that party's negligent acts or omissions in the performance of this Contract in accordance with applicable law. This provision does not affect the right of either party to this Contract who is sued by a third party for acts or omissions arising from this Contract to bring in the other party to this Contract as a third -party defendant as allowed by law. E. Assignment. The Contractor shall not assign this Contract without the prior written consent of the City. F. Law Governing and Venue. This Contract is governed by the law of the State of Texas and a lawsuit may only be prosecuted on this Contract in a court of competent jurisdiction located in or having jurisdiction in Brazoria County, Texas. G. Entire Contract. This Contract represents the entire Contract between the City and the Contractor and supersedes all prior negotiations, representations, or contracts, either written or oral. This Contract may be amended only by written instrument signed by both parties. H. Independent Contractor. Contractor shall perform the work under this Contract as an independent contractor and not as an employee of the City. The City has no right to supervise, direct, or control the Contractor or Contractor's officers or employees in the means, methods, or details of the work to be performed by Contractor under this Contract. The City and Contractor agree that the work performed under this Contract is not inherently dangerous, that Contractor will perform the work in a workmanlike manner, and that Contractor will take proper care and precautions to insure the safety of Contractor's officers and employees. I. Dispute Resolution Procedures. The Contractor and City desire an expeditious means to resolve any disputes that may arise between them regarding this Contract. If either party disputes any matter relating to this Contract, the parties agree to try in good faith, before bringing any legal action, to settle the dispute by submitting the matter to mediation before a third party who will be selected by agreement of the parties. The parties will each pay one-half of the mediator's fees. J. Attomev's Fees. Should either party to this Contract bring suit against the other party for breach of contract or for any other cause relating to this Contract, neither party will seek or be entitled to an award of attomey's fees or other costs relating to the suit. K. Severability. If a court finds or rules that any part of this Contract is invalid or unlawful, the remainder of the Contract continues to be binding on the parties. IV. Special Terms or Conditions. None. V. Additional Contract Documents. The following specified documents attached to this Contract are part of this Contract, except as follows: any provision contained in any of the Contractor's Additional Contract Documents specified below that conflicts with a Contract provision not included in the Contractor's Additional Contract Documents, does not apply to this Contract. A. Contractor's Additional Contract Documents: 1. The contractor's response to Bid #0914-61 shall be construed as additional contract documents. 2. Executed Contractor Insurance Requirements & Agreement (required insurance certificate[s] shall be in possession of City at actual commencement of work). B. City's Additional Contract Documents: 1. Scope of Services as listed on the attached. CONTRACTOR'S SCOPE OF SERVICES Scope of services provided shall consist of providing water fittings and related parts, per the specifications and amended award item list below, of City of Pearland bid #0914-61; City Council Resolution #R2015-226. Pricing is as follows: HD Supply Waterworks Description Mfgr MfgNo UOM EST QTY Unit SEC 13 CURB STOPS AND BRASS CTS FITTINGS 13.1 3/4 IN. CTS X 3/4 M/NUT FORD B43 -232W EA 48 $32.30 13.2 1 IN. CTS X 3/4 M/NUT FORD B43 -334W EA 144 $53.50 13.3 1 IN. CTS X 1 IN. M/NUT FORD B43 -444W EA 144 $73.20 13.4 3/4 IN. FIP X FIP FORD B11-333 EA 48 $38.40 13.5 1 IN. FIP X FIP FORD B11-344 EA 24 $42.70 13.6 3/4 IN. CTS X 3/4 IN. M/NUT 90 FORD B43 -232W EA 24 $31.90 13.7 1 IN. CTS X 3/4 M/NUT 90 FORD B43 -242W EA 48 $41.10 13.8 1 IN. CTS X 1 IN. M/NUT 90 FORD B43 -344W EA 24 $64.80 13.9 3/4 IN. FIP X 3/4 IN. METER NUT (ANGLE 90 DEG) FORD B13 -232W EA 24 $27.10 13.10 3/4 IN. FIP X 3/4 IN. METER NUT (STRAIGHT) FORD B13 -232W EA 24 $26.80 13.11 1 IN. FIP X 1 IN. METER NUT (ANGLE 90 DEG) FORD B13 -344W EA 12 $54.50 13.12 1 IN. FIP X 1 IN. METER NUT (STRAIGHT) FORD B13 -344W EA 12 $48.00 13.13 2 IN. PJ -CTS X FLANGE FORD BF43-777W EA 12 $221.80 13.14 2 IN. PJ -CTS X FLANGE 90 DEG FORD FV43-777W EA 12 $173.90 13.15 1-1/2 IN. FLANGE X CTS FORD BF43-666W EA 6 $130.90 SEC 14 U -BRANCH ASSEMBLY 14.1 1 IN. PJ -CTS X 3/4 IN. METER NUT (STRAIGHT) FORD UVBS43 EA 144 $88.00 14.2 1 IN. PJ -CTS X 3/4 IN. METER NUT (ANGLED) FORD UVB43 EA 144 $92.60 14.3 3/4 IN. CTS UNION FORD C44-33 EA 144 $13.10 14.4 3/4 IN. CTS X 3/4 IN. PVC UNION FORD C47-33 EA 12 $17.70 14.5 3/4 IN. INSTA TITE COUPLING FORD C44 -33-U- NL EA 144 $13.10 14.6 1 IN. CTS UNION 90 FORD L44-44 EA 24 $21.70 14.7 1 IN. CTS X 3/4 IN. CTS UNION FORD C44-34 EA 24 $15.20 14.8 1 IN. CTS UNION FORD C44-44 EA 144 $15.00 14.9 1 IN. CTS X 1 IN. PVC UNION FORD C47-44 EA 12 $25.60 14.10 1 IN. PVC UNION FORD C77-44 EA 12 $32.50 14.11 1 IN. INSTA TITE COUPLING FORD C44 -44-U- NL EA 144 $15.00 14.12 1-1/2 IN. CTS UNION FORD C44-66 EA 6 $50.20 14.13 2 IN. CTS UNION FORD C44-77 EA 12 $67.70 14.14 2 IN. CTS UNION 90 FORD L44-77 EA 24 $141.40 14.15 1 IN. CC X 1 IN. CTS CORP FORD F1000 -4 -NL EA 288 $35.50 14.16 2 IN. CC X 2 IN. CTS CORP FORD FB1000-7 EA 24 $169.00 14.17 3/4 IN. X 3/4 IN. X 3/4 IN. PJ -CTS (TEE) FORD T444-333 EA 2 $31.00 14.18 1 IN. X 1 IN. X 3/4 IN. PJ - CTS (TEE) FORD T444-443 EA 2 $34.15 14.19 1 IN. X 1 IN. X 1 IN. PJ - CTS (TEE) FORD T444-444 EA 2 $33.20 14.20 1 IN. X 3/4 IN. X 3/4 IN. PJ -CTS (WYE) FORD Y44-243 EA 2 $27.10 14.21 1-1/2 IN. FLANGE (BRASS) FORD CF31-66 EA 6 $31.10 14.22 2 IN. FLANGE (BRASS) FORD CF31-77 EA 24 $40.60 14.23 3/4 IN. SPUDS FORD 038-13- 2.188 EA 144 $7.70 14.24 1 IN. SPUDS FORD C38-44-2 EA 144 $10.40 14.25 3/4 IN. X 2-1/2 IN. SPUDS FORD C38-23-2.5 EA 12 $7.00 14.26 3/4 IN. X 3 IN. SPUDS FORD C38-23-3 EA 12 $8.40 14.27 3/4 IN. X 8-1/2 IN. SPUDS FORD C38-23-8.5 EA 12 $18.00 SEC 15 METER RISERS 15.1 3/4 IN. 7 IN. FORD EA 4 $65.90 15.2 3/4 IN. 9 IN. FORD EA 4 $66.70 15.3 3/4 IN. 15 IN. FORD EA 4 $71.90 15.4 1 IN. 9 IN. FORD EA 4 $125.00 15.5 1 IN. 15 IN. FORD EA 4 $132.00 SEC 17 BRASS ADAPTERS 17.14 1 IN. X 3/4 IN. METER NUT ADAPTER FORD EA 6 $17.80 17.22 2 IN. FIP X PVC COMP FORD C07-77 EA 6 $79.60 SEC 20 TAPPING SADDLES 20.1 2 X 1 CC ROMAC IND. EA 4 $18.40 20.2 2-1/2 X 1 CC ROMAC IND. EA 2 $18.40 20.3 3 X 1 CC ROMAC IND. EA 2 $18.90 20.4 4 X 1 CC ROMAC IND. EA 2 $19.95 20.5 4 X 2 CC ROMAC IND. EA 2 $25.05 20.6 4 X 2 IP ROMAC IND. EA 6 $25.05 20.7 6 X 1 CC ROMAC IND. EA 12 $23.15 20.8 6 X 2 CC ROMAC IND. EA 12 $27.20 20.9 6 X 2 IP ROMAC IND. EA 4 $27.20 20.10 8 X 1 CC ROMAC IND. EA 24 $27.50 20.11 8 X 2 CC ROMAC IND. EA 12 $32.80 20.12 8 X 2 IP ROMAC IND. EA 2 $32.80 20.13 10 X 1 CC ROMAC IND. EA 12 $30.50 20.14 10 X 2 CC ROMAC IND. EA 12 $37.30 20.15 10 X 2 IP ROMAC IND. EA 2 $37.30 20.16 12 X 1 CC ROMAC IND. EA 12 $35.30 20.17 12 X 2 CC ROMAC IND. EA 12 $43.35 20.18 12 X 2 IP ROMAC IND. EA 2 $43.35 20.19 16 X 1 CC ROMAC IND. EA 6 $87.95 20.20 16 X 2 CC ROMAC IND. EA 12 $96.00 20.21 16 X 2 IP ROMAC IND. EA 2 $96.00 SEC 31 MISCELLANEOUS SUPPLIES 31.1 "T PLUS 2 TEFLON PASTE, 1/2 PINT CANS" EA 48 $11.00