Loading...
R-2015-184 2015-10-12RESOLUTION NO. R2015-184 A Resolution of the City Council of the City of Pearland, Texas, approving an amended application for Texas Water Development Board Funding for the construction costs related to Reflection Bay Water Reclamation Facility Expansion and the design build costs for temporary wastewater treatment package plant in the amount of $61,200,000.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City Council hereby approves application for Texas Water Development Board Funding for the construction costs related to the Reflection Bay Water Reclamation Facility Expansion and the design build costs for temporary wastewater treatment package plant in the amount of S61.200.000.00. a copy of which is attached hereto as Exhibit '`A" and made a part hereof for all purposes. Section 2. The City Manager or his designee is hereby authorized to execute an amended application for Texas Water Development Board Funding for the construction costs related to the Reflection Bay Water Reclamation Facility Expansion and the design build costs for temporary wastewater treatment package plant. PASSED. APPROVED and ADOPTED this the 12TH day of October. A.D.. 2015. ATTEST: •4 NG LO' ~TY SE•TARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR Resolution No. R2015-184 Exhibit " A" TWDB-0201a Rev 1/3/2014 Application Filing and Authorized Representative Resolution (WRD-201a) A RESOLUTION by the City Council of the City of Pearland, Texas requesting financial assistance from the Texas Water Development Board; authorizing the filing of an application for assistance; and making certain findings in connection therewith. BE IT RESOLVED BY THE City Council OF THE City of Pearland, Texas SECTION 1: That an application is hereby approved and authorized to be filed with the Texas Water Development Board seeking financial assistance in an amount not to exceed $ 61,200,000 to provide for the costs of expansion of the City's Reflection Bay Water Reclamation Facility including construction of the permanent expansion and design and construction of the emergency design build temporary package plant project. SECTION 2: That City Manager, Deputy City Manager and Assistant City Manager be and is hereby designated the authorized representative of the City of Pearland, Texas for purposes of furnishing such information and executing such documents as may be required in connection with the preparation and filing of such application for financial assistance and the rules of the Texas Water Development Board. SECTION 3: That the following firms and individuals are hereby authorized and directed to aid and assist in the preparation and submission of such application and appear on behalf of and represent the City of Pearland, Texas before any hearing held by the Texas Water Development Board on such application, to wit: Financial Advisor: I ngineer: Bond Counsel: Mr. John Robuck. Vice President - Texas Public Finance BOSC, Inc. 1401 McKinney St. Suite 1000 Houston, TX 77010 Mr. Kimberly M Chanslor. P E. CDM Smith Inc. 3050 Post Oak Blvd., Suite 300 Houston, Texas 77056 Mr. Rick A. Witte Andrews Kurth 600 Travis, Suite 4200 Houston TX 77002 PASSED AND APPROVED, this the 12th day of October By: ,20.15 RESOLUTION NO. R2015-14 A Resolution of the City Council of the City of Pearland, Texas, approving an application for Texas Water Development Board Funding for the construction costs related to Reflection Bay Water Reclamation Facility Expansion and the design build costs for temporary wastewater treatment package plant in the amount of $55,000,000. WHEREAS, the City of Pearland has the authority to design, construct, operate and maintain wastewater collection and treatment facilities; to raise revenues and assess appropriate charges to assure that each participating party pays its appropriate share of sewerage system costs; to accept or refuse to accept any wastes from any participating party; to accept and utilize grants or other funds from any source for wastewater management purposes; and, to carry out appropriate portions of an area wide water quality management plan; BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City Council hereby approves application for Texas Water Development Board Funding for the construction costs related to the Reflection Bay Water Reclamation Facility Expansion and the design build costs for temporary wastewater treatment package plant in the amount of $55,000,000, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes. Section 2. That the City of Pearland seeks a designation as a management agency for wastewater collection and treatment within its city limits, in accordance with the requirements of Section 208 of the Federal Water Pollution Control Act, as amended. PASSED, APPROVED and ADOPTED this the 26TH day of January, A.D., 2015. TOM REID MAYOR ATTEST: APPROVED AS TO FORM: =,,._,- ci;_, DARRIN M. COKER CITY ATTORNEY Application Affidavit (wRo-201) THE STATE OF TEXAS § COUNTY OF Brazoria APPLICANT City of Pearland, Texas T W Dlt-0201 Revised 221!2013 BEFORE ME, the undersigned, a Notary Public in and for the State of Texas, on this clay personally appeared Mr. Clay Pearson City of Pearland, Texas as the Authorized Representative of the , who being by me duly sworn, upon oath says that: 1. the decision by the City of Pearland, Texas ____ (authority, city, county, corporation, district) to request financial assistance from the Texas Water Development Board ("Board") was made in a public meeting held in accordance with the Open Meetings Act (Government Code, §551.001, et seq,) and after providing all such notice as required by such Act as is applicable to the City of Pearland, Texas (authority, city, county, corm anon, district) ; 2. the information submitted in the application is true and correct according to my best knowledge and belief; 3. the City of Pearland, Texas (authority, city, county, corp(Mation. district) has no pcnding. threatened, or outstanding judgments, orders, tines, penalties, taxes, assessment or other enforcement or compliance issue of any kind or nature by the Environmental Protection Agency, Texas Commission on Environmental Quality, Texas Comptroller. Texas Secretary of State, or any other federal, state or local government, except for the following (if no such outstanding compliance issues, write in "none"): the pending compliance violations and enforcement negotiations with the Texas Commission on Environmental Quality concerning the Reflection Bay Water Reclamation Facility (formerly Far Northwest Wastewater Treatment Plant). 4. the _ City of Pearland, Texas (authority, city, county, corporation, district) warrants cotnpliance with the representations made in the application in the event that the Board provides the financial assistance: and 5. the City of Pearland, Texas (authority. city, county, corporation, district) will comply with all applicable federal laws, rules, and regulations as well as the la% . • t s state and tl}etrules and regulations of the Board. cial Repres tative - Mr. Clay Pearson Title: City :nager SWORN TO AND SUBSCRIBED BEFORE ME, by C 1 Pf,a it so AI this et V day of .SML14 V ( , 2015. (NOTARY'S SEAL) MARIA E. RODRIGUEZ Notary Public, State of Texas My-Coramission Exptns• 0212612017 ,,t .11 \ I'i Iic, State of Texas TWDB-02018 Revised 02/212013 Application Resolution - Certificate of Secretary (WRD-201b) THE STATE 01' TEXAS COUNTY OF Brazoria APPLICANT City of Pearinad I, the undersigned, Secretary of the City of Pearland DO IIEREBY CERTIFY as follows: I . That on the 26th day of January City of Pearland Texas, , 20 15 , a regular/special meeting of the held at a meeting place within the City; the duly constituted members of the City Council of the City of Pearland, Texas Carbone, Sherman, Ordeneaux,Moore and Hill and all of said persons were present at said meeting, except the following: being as follows: Among other business considered at said meeting, the attached resolution entitled: "A RESOLUTION by the City Council of the City of Pearland, Texas requesting financial participation from the Texas Water Development Board; authorizing the filing of an application for financial participation; and making certain findings in connection therewith." City of Pearland City Council was introduced and submitted to the for passage and adoption. After presentation and due consideration of the resolution, and upon a motion made by pounci lmember Hi 11 and seconded by Counc i ltnember Carbone____, the resolution was duly passed and adopted by the by the following vote: S.. voted "For" voted "Against" abstained all as shown in the official Minutes of the January 26, 2O1 $or the meeting held on the aforesaid date. 2. That the attached resolution is a true and correct copy of the original on file in the official records of the City of Pearland, Texas ; the duly qualified and acting members of the City Council on the date of the aforesaid meeting are those persons shown above and, according to the records of my office, advance notice of the time, place and purpose of said meeting was given to each member of the City Council ; and that said meetip, and deliberation of the aforesaid public business, was open to the public and written notice of said meeting, including the subject of the above entitled resolution, was posted and given in advance thereof in compliance with the provisions of Chapter 551 of the Texas Government Code. IN WITNESS WHEREOF, 1 have hereunto signed my name officially and affixed the seal of said a( SGG 6f _ , this thea _ of_SANt i kir5 , 20454 . ung Lo i •, TRMC ty Secretary STATE OF TEXAS COUNTY OF Brazoria SITE CERTIFICATE ED•10I Revised I 1/Ino1 Before me, the undersigned notary, on this day personally appeared Clay Pearson, City Manager , a person whose identity is known to me or who has presented to me a satisfactory proof of identity. After 1 adtninistered an oath, this person swore to the following: (1) My name is Clay Pearson, City Manager of the City of Pearland, Texas . I atn over 18 years of age and 1 am of sound mind, and capable of swearing to the facts contained in this Site Certificate. The facts stated in this certificate are within my personal knowledge and are true and correct. (2) I am an authorized representative of City of Pearland , an entity that has filed an application for financial assistance with the Texas Water Development Board for a (water) (wastewater) project. LEGAL CERTIFICATION — OWNERSHIP INTEREST This is to certify that the City of Pearland, Texas (legal Name of Applicant, i.e., City, District, etc.) has acquired or is in the process of acquiring the necessary real property interest, as evidenced by fee simple purchase or fully executed earnest money contracts, tirm option agreements to purchase the subject property or the initiation of eminent domain procedures, that such acquisition will guarantee access and egress and such interest will contain the necessary easements, rights of way or unrestricted use as is required for the project being financed by the Texas Water Development Board. The legal description is referenced below: 1818 Reflection Bay Drive, Pearland Texas 77584 (Locution. and Description of I'rotactty Interests ucnuired for Project) Any deeds or other instruments required to be recorded to protect the title(s) held by the City of Pearland, Texas (t.ceal Mune of Aoplicant) have been recorded or filed for the record in the County deed records or other required location. ED -101 Revised 11/1/2011 Not Applicable LEGAL CERTIFICATION — LEASE/CONTRACT In the alternative, I certify that tt,stitt ' ame of Applicant i.4.,Sity, District. etc.) has executed a written lease or other contractual agreement to use the property needed for this (water) (wastewater) project that extends through , the life of the Texas Water Development Board loan or grant that will be used to finance this project, either in whole or in part. A copy of this lease or agreement is attached hereto. Not Applicable LEGAL CERTIFICATION — PROPERTY EASEMENT In the alternative, 1 certify that (Legal Nanie of Applicant, i.e , City, District, ctc.) has executed an express easement to use the property needed for this (water) (wastewater) project that extends through , the life of the Texas Water Development Board loan or grant that will be used to finance this project, either in whole or in part. A copy of the express easement agreement is attached hereto. EXECUTED this 26 day of 01 , 20 15 . (Sig Mr. Clay Pear on (Print Name) City Manager (Title) Sworn to and subscribed before me by •2614`on DI , 201 [SEAL] U t Notary Public, State of Texas MARIA S. RODRIG'{ eeinMy Commission Explrea: o�1 02/26/2017 Notary Public in and for the State of j xas My Commission expires: 02.. .,Z,o i+j ‘,VRD-213 Revisal May, 2009 CERTIFICATION REGARDING LOBBYING The undersigned certifies, to the best of his or her knowledge and belief, that: 1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. 2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form LLL "Disclosure Form to Report Lobbing," in accordance with its instructions. 3. The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. § 1352. Any person who fails to file the required certification shall be subject to a civil penalty of not 1 _t at $10,A00 and not more than $100,000 for each such failure. Head of,kgency or Organization Mr. Clay Pearson, City Manager Type Name & Title Name and Address of Agency/Organization: City of Peariand, Texas; 3519 Liberty Drive Pearland TX 775814 Date RESOLUTION NO. R2015-14 A Resolution of the City Council of the City of Pearland, Texas, approving an application for Texas Water Development Board Funding for the construction costs related to Reflection Bay Water Reclamation Facility Expansion and the design build costs for temporary wastewater treatment package plant in the amount of $55,000,000. WHEREAS, the City of Pearland has the authority to design, construct, operate and maintain wastewater collection and treatment facilities; to raise revenues and assess appropriate charges to assure that each participating party pays its appropriate share of sewerage system costs; to accept or refuse to accept any wastes from any participating party; to accept and utilize grants or other funds from any source for wastewater management purposes; and, to carry out appropriate portions of an area wide water quality management plan; BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City Council hereby approves application for Texas Water Development Board Funding for the construction costs related to the Reflection Bay Water Reclamation Facility Expansion and the design build costs for temporary wastewater treatment package plant in the amount of $55,000,000, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes. Section 2. That the City of Pearland seeks a designation as a management agency for wastewater collection and treatment within its city limits, in accordance with the requirements of Section 208 of the Federal Water Pollution Control Act, as amended. PASSED, APPROVED and ADOPTED this the 26TH day of January, A.D., 2015. „), TOM REID MAYOR RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Memo To: Clay Pearson. City Manager From: Andrea Brinkley. Project Manager CC: Jon Branson, Deputy City Manager Trent Epperson, Assistant City Manag Claire Bogard, Director of Finance Susan Polka. P.E. Director of Eng eering Skipper Jones. Assistant Projec : Director Eric Wilson, Director of Public orks Date: September 21, 2015 9/23/2015 To: Mayor and City Council members Update on Reflection Bay Water Reclamation two projects (temp and permanent expansion of capacity). Deleted prior admin packets for length (available on Pearnet). Clay RE: Reflection Bay Water Reclamation Facility (Far Northwest Wastewater Treatment Plant) Expansion and Temporary Wastewater Package Plant Update This memo will provide an update on the status of the Reflection Bay Water Reclamation Facility (RB WRF) Expansion, and the status of the Temporary Wastewater Treatment Package Plant, being delivered via Design Build method. P Memoranda dated 5/27/14 (3), 6/18/14, 7/24/14, 8/8/14 and 10/30/14 (2), 1/8/15, 3/4/15, 5/6/15 and 7/22/15. Design Update for Facility Expansion — Update to 7/22/15 Memorandum The Design effort for the expansion to a 6 MGD facility is at the 90% review status with plans due for submittal September 25th. Equipment selection has been made and staff and the engineer are working on the criteria set for use in the bid documents. A series of plan review workshops is planned to conduct concurrent staff review. The current schedule is to bid the project in late November. Staff and the engineer continue to monitor construction cost trends for this particular type of work and the upward trend has not changed. The list of add/deduct alternates and reductions in scope estimated at of $600.000. have been retained to provide flexibility if necessary. As discussed in the 7/22/15 memorandum. there will be a contract amendment in the amount of $120.000 submitted for Council review that encompasses two items: the revision in building materials from block/brick to pre -fabricated masonry ($70.000) and the change in UltraViolet Disinfection equipment manufacturer ($50,000). The change in building material, while requiring a $70,000 contract amendment will ultimately provide a cost savings of $480,000 (inclusive) in construction costs. The change in the UltraViolet Disinfection manufacturers is driven by continued performance issues with the existing equipment. and a lack of support by RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE the manufacturer. The Contract amendment is being finalized and will be presented to Council in October for consideration. Current Facility Status — Update to 7/22/15 Memorandum Facility flows continue to be over 100%. and the extent of variation of flows is affected by rain in addition to population growth. This has been documented by staff and TCEQ will continue to be notified in accordance with all appurtenant regulations. Improved performance from re- programming and aeration basins improvements and this has improved treatment quality. Temporary Wastewater Treatment Package Plant Update The construction of the package is on schedule. Since the delivery of the aeration and clarifier tanks for Phase 1, piping has been installed from the new influent pump station location to the new headworks location and tanks. • Civil/sitework construction is 90% complete. • Installation of process piping is 50% complete. • Welded effluent flanges of package plant aeration basins. • Installed dewatering in preparation for the 42 in pipe tie in installation that will connect the package plant to existing UltraViolet disinfection • Electrical installation is underway and is 8% complete • Installation of structural fill for equipment foundations • Approved bids for concrete equipment foundations Expected work in the next 2 months: • Complete major piping installation • Installation of foundation and new influent pump slab base • Delivery of RAS/VIAS/Scum tankage. package plant filter • Delivery of interior components of the clarifier for Phase 1 • Delivery of blowers TWDB Funding for the Facility Expansion and Package Treatment Plant The Texas Water Development Board (TWDB) funding assistance application was reviewed by TWDB staff. and City staff provided some clarifications. Notification was received that the application is to be considered by the TWDB in October 2015. and an estimated loan closing timeframe is January 2016. TCEQ Enforcement Action The City has completed the Supplemental Environmental Project (SEP) agreement associated with the Agreed Order (AO) and this has been documented with the TCEQ. The City has sent a report regarding an updated schedule for both design and construction progress to the TCEQ. There are provisions within the AO that do allow for amendments to the scheduling of the projects. The City's update documents the current schedule for the package plant and plant expansion and the extension request per the AO. 21 RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Expansion Project Schedule Design August 2014 — November 2015 Bid/Council Award December 2015 Notice to Proceed with Construction January 2016 — January 2018 Package Plant Project Schedule Design -Build Council Award Sitework/Equipment Procurement Phase 1 0.5 MGD Operational Phase 2 1 MGD Operational Photos: January 2015 March 2015 December 2015 June 2016 Construction of pipe to avoid future Expansion piping. 12 in pipe to package plant headworks Delivery of structural base for equipment foundations. 3I RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE Electrical contractor excavating trench for electrical conduit installation. Electrical contractor erecting power pole for package plant power Lloyd Gosselink /Am nnu% w..uI 816 Congress Avenue. Suite 1900 Ausln,Texas 78701 Telephone: (512) 322-5800 Facsimile: (512) 472-0532 ATTORNEYS AT L A W Ms. Thomas' Direct Line: (512) 322-5881 Email. at omas@Iglawfrrm.com September 16, 2015 Ms. Lanae Foard (MC -169) Texas Commission on Environmental Quality P.U. Box 13087 Austin, Texas 78711-3087 Dear Lanae: www.Iglawfirm.com VIA ELECTRONIC TRANSMISSION Re: City of Pearland TCEQ Docket Number 2013 -1816 -MWD -E This letter is submitted on behalf of the City of Pearland (the "City") with regard to the above -referenced Agreed Order (the "Order") to certify compliance with part of Ordering Provision 3.a. and to request an extension for compliance with the remaining part of Ordering Provision 3.a., Ordering Provision 3.b., and Ordering Provision 3.c. Included as Attachment A is a memo from CDM Smith ("CDM") detailing the status of the City's efforts to achieve compliance with the Order and showing that the design of the Emergency Capacity is 100% complete, part of the requirement for Ordering Provision 3.a. In addition to requiring the completed design of the Emergency Capacity, Ordering Provision 3.a. also requires the City to have completed design of the New Facility. The deadline for compliance with Ordering Provision 3.a. is September 1, 2015. Ordering Provision 3.b requires the City to commence construction of the New Facility by November 2, 2015. Ordering Provision 3.c. requires the City to complete construction of the Emergency Capacity by January 2, 2016. To achieve compliance with Ordering Provision 3.a., the City contracted with CDM Smith ("CDM") as discussed in Attachment A. After the design of the New Facility was 60% complete, CDM estimated that construction of the New Facility would cost approximately $43,000,000. This was $4,000,000 over the 30% design cost estimate, so CDM's focus over the last few months has been on developing value engineering ideas to carry forward in the 90% design submittal in order to keep the overall project construction costs within the City's budget constraints. This effort delayed design progression to 90% complete, but resulted in the project team identifying approximately $1,000,000 in construction cost savings. Final design of the New Facility is now scheduled to be complete by the end of December 2015 and construction to commence in March 2016. 5186489.1 Lloyd Gosselink Rochelle & Townsend, P.C. Ms. Lanae Foard September 16, 2015 Page 2 As discussed in Attachment A, following the design of the Emergency Capacity, CUM and the City determined that the Emergency Capacity should be built in two phases in order to more quickly alleviate and address the loading issues at the existing Facility. Both phases are expected to be completed by the end of June 2016. Included as Attachment B is the Gantt chart prepared by CDM that estimates compliance with the Ordering Provision 3.a. regarding completing design of the New Facility to be by the end of December 2015. compliance with Ordering Provision 3.b. regarding commencing construction of the New Facility to be in March 2016, and compliance with Ordering Provision 3.c. to be by the end of June 2016. The City therefore requests the deadline for compliance with the part of Ordering Provision 3.a. requiring complete design of the New Facility be extended to December 31, 2015. Given this requested extension, and the justification discussed herein, the City also requests that the following Ordering Provisions be extended accordingly: Ordering Provision No. Ordering Provision No. 3.b. Ordering Provision No. 3.c Extension Date Requested April 1, 2016 — ___ July 1.2016 Permit compliance and environmental stewardship arc important to the City. By granting this extension. the Executive Director will allow the City additional time needed to ensure compliance with the Order. if you have any questions regarding this correspondence, feel free to call either Brad Castleberry (512-322-5856) or Sara Thornton (512-322-5876) at your convenience. $incere 1 , ,- - Ashley I). I honyls ADT/jg ENCLOSURES cc: Mr. Bryan Eastham, TCEQ Region 12 Mr. Eric Nilson, City of Pearland Mr. [3rad Castleberry, of the Firm 5186489 I Ms. Lanae Foard September 16, 2015 Page 3 CERTIFICATION OF FILING "I certify under penalty of law that 1 have personally examined and am familiar with the information submitted and all attached documents, and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." STATE OF TEXAS COUNTY OF TRAVIS § li}7_ • Mhley D. Thomas This instrument was acknowledged before me on the 16th day of September, 2015, by Ashley D. Thomas on behalf of the City of Pcarland. !✓:7' . LAURA O.PASOUALE tNOTARY PUBLIC 4 State of Texas ! ..n.1-070.." Comm. Exp. 04-13-2019 5186489.1 ,r, l) Notary Public, State of Tq as Printed Name: Laura Di Pasquale My Commission expires: �i/ V IMaL\IHDVIIV CDMSith TBPE Firm Registration No. F-3043 Memorandum To: Eric Wilson, Director of Public Works, City of Pearland Andrea Brinkley, Project Manager, City of Pearland From: Kim Chanslor, P.E. Principal CDM Smith Jennifer Paradis, Project Manager CDM Constructors Inc. Date: September 16, 2015 Subject: City of Pearland Reflection Bay Water Reclamation Facility (WRF) Package Plant Project & Rehabilitation and Expansion Project Progress Update The following technical memorandum documents progress to date on the City of Pearland Reflection Bay Water Reclamation Facility (WRF) Package Plant Project and the Reflection Bay WRF 2 MGD to 6 MGD Expansion and Rehabilitation Project. Reflection Bay WRF Package Plant Expansion Project The City of Pearland executed a design build contract with CDM Constructors Inc. on January 26th, 2015 for the design and construction of a 1 MGD package plant for temporary treatment at the Reflection Bay WRF Plant. The design build project consists of installing a new step screen at the existing headworks structure and construction of an influent pump station that will divert 1MGD of flow through a new package plant facility. The project will tie the package plant flow into an existing 42" pipeline prior to the existing UV disinfection system. The package plant facility is separated into two (2) phases of work. Phase 1 will consist of eight (8) aeration basins, two (2) clarifiers, Return Activated Sludge (RAS)/Waste Activated Sludge (WAS)/Scum pumps and tanks, as well as new cloth disk filters. Phase 2 will consist of an additional eight (8) aeration basins, and two (2) clarifiers. Additionally, there will be a bypass from the existing Sequence Batch Reactors (SBR's) to two (2) new cloth disk filters. The flow from the existing SBR's will pass through the new filters and then tie into the package plant flow prior to the existing 42" line upstream of the existing UV disinfection facility. The City of Pearland, CDM Smith and CDM Constructors project team commenced work in January 2015 with an anticipated completion date for Phase 1 of December 2015 and Phase 2 completion of June 2016. Currently the project is on track for completing both phase 1 and 2 on the aforementioned dates. To date the team has completed 100% of design. Phase 1 aerations basins (8) and clarifiers (2) have been fabricated and delivered. Photos 1 and 2 of the attached Exhibit A illustrate the aeration basins and clarifiers on site. The headworks tower. RAS/WAS/Scum tank and blowers are scheduled for delivery in the end of September 2015. The cloth disc filters are in fabrication with an expected delivery of late September 2015. The new storm sewer has been installed and the existing storm sewer has been demolished. Other construction activities include installation of the 30" filtered effluent line from the SBR filters to the existing 42" tie in location, as well as the installation of the 12" raw sewage line from the influent pump station to the package plant headworks tower. Photos 3 and 4 in Exhibit A attached illustrates construction activity for the installation of the 30" filtered effluent line and the 12" raw sewage line. The 42" tie in materials have been delivered. The motor control centers for the new package plant have been fabricated, delivered and installed. The electrical contractor has installed the direct bury cables from MCC -D to the blowers. The project team is working diligently to compress the contract schedule and expedite the work to complete the project ahead of schedule. Reflection Bay WRF 2 MGD to 6 MGD Expansion and Rehabilitation Project The City of Pearland executed a design contract with CDM Smith, Inc. on August 11, 2014 for the expansion and rehabilitation of the Reflection Bay WRF. The project includes expansion of the existing influent lift station, new headworks structure, new SBR trains to handle increased flow and improvements to the existing SBR trains including a new blower facility, new tertiary filtration, expansion and replacement of the existing UV facility equipment, new sludge holding tanks and dewatering feed pumps, new belt press equipment installed in the existing dewatering building, modifications to the existing dewatering building, new non -potable water system facility, new emergency generator, SCADA improvements, and miscellaneous other improvements include yard piping, pacing and drainage, and site improvements to accommodate increased capacity. The project has progressed to complete 60% design and is currently scheduled to complete 90% design by November 9, 2015. The project team has been focused over the last two months on developing value engineering ideas to carry forward in the 90% design submittal in order to keep the overall project construction within budget constraints which has delayed design progression to 90%. Following the 60% design submittal the Opinion of Probable Construction Cost was approximately forty three million dollars, 4 million over the 30% design submittal Opinion of Probably Construction Cost. Through the value engineering process the project team has identified approximately one million dollars in construction cost savings. Final design is scheduled to complete by the end of December 2015 and construction commence by the end of March 2016. Attachments: • Package Plant Expansion Project Construction Progress Photos - Exhibit A • Reflection Bay WRF Expansion and Emergency Package Plant Overall Design and Construction Schedule - Exhibit B v lm(gxa Photo 1 11. • • .ti Photo 2 Photo 3 Photo 4 Photo 5 6" WAS Line 42" Effluent Piping 2 Electrical Power Pole by MCC -D Electrical Stub ups in Blower Pad 3 • Package Plant Base Materials Installed 4 City of Pearland Reflection Bay WRF Expansion and Emergency Package Plant Project Exhibit 8 - Design and Construction Schedule ID Task Name jCalendar Start Finish 201"5L L 4L2�016 __ 2017 _ _ _ 2018 Das Qtr 3kltr 4Atr 8.1tr 1'tr 3}atr 41Qtr tr2tr' tr tr 1Atr 21Qtr qtr 4iatr 1K1tr 3 1 Expansion Project Notice to Proceed 0 Tue 8/12/14 Tue 8/12/14 • 8/12 2 Detailed Design 498 Wed 8/13/14 Wed 12/23/15 13 Bidding Servkes 71 Tue 1/5/16 Tue 3/15/16 20 Construction 728 Wed 3/16/16 Tue 3/13/18 24 25 Emergency Package Plant Project 0 Mon 1/26/15 Mon 1/26/15 Notice to Proceed —26—Emergency Package Plant Design 187 Mon 1/26/15 Fri 7/31/15 28 Phase 1 Construction 340 Mon 1/26/15 Thu 12/31/15 30 Phase 2 Construction 182 Fri 1/1/16 Thu 6/30/16 • 1/26 a 1MINHDV11V City of Pearland Reflection Bay WRF Expansion and Emergency Package Plant Project Exhibit 8 - Design and Construction Schedule ID Task Name Calendar Start 'Finish 2015 12016 2017 2018 I} Days _ qtr 3gtr 4Qtr ligtr 2Qtr___ tr tr -tr Qtr qtr 1�t 4�tr ULU_ 3 1tr tr lgtr b 1 (Expansion Project Notice to Proceed 0 Tue 8/12/14 Tue 8/12/14 • 8/12 2 1Detailed Design 498 Wed 8/13/14 Wed 12/23/15 13 iBidding Services 71 Tue 1/5/16 Tue 3/15/16 20 Construction 728 Wed 3/16/16 Tue 3/13/18 24 25 Emergency Package Plant Project 0 Mon 1/26/15 Mon 1/26/15 Notice to Proceed 26 Emergency Package Plant Design 187 Mon 1/26/15 Fri 7/31/15 28 Phase 1 Construction 340 Mon 1/26/15 Thu 12/31/15 30 !Phase 2 Construction 182 Fri 1/1/16 Thu 6/30/16 4, 1/26 Reflection Bay Water Reclamation Facility Location Map SH 288 Kirby Dr RB WRF FM 2234/Shadow Creek Parkway Contract Amendment: Sub Consultant and Add Odor Control "Hilton Garden Inn inn. >ena.n .v... erw Worsen w lona.. 49.1 snV•nss,•q n JVs.,wl,spevnan ortn 4r� ...VOW./ era/ b<s'b d V•ep� b fl*,!se Scale 110.993 I In•88311 NORTH