Loading...
HomeMy WebLinkAboutR2015-136 2015-08-10RESOLUTION NO. R2015-136 A Resolution of the City Council of the City of Pearland, Texas, authorizing the City Manager or his designee to enter into a Reimbursement Agreement with the Pearland Economic Development Corporation and a Letter Financing Agreement with the Lower Kirby Pearland Management District for the design and construction of Kirby Ditch Improvements Lateral Ditch No. 1 Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain Letter Financing Agreement by and between the City of Pearland and the Lower Kirby Pearland Management District, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That certain Reimbursement Agreement, by and between the City and the Pearland Economic Development Corporation, a copy of which is attached hereto as Exhibit "B" and made a part hereof for all purposes, is hereby authorized and approved. Section 3. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the Letter Financing Agreement and Reimbursement Agreement attached hereto. PASSED, APPROVED and ADOPTED this the 10th day of August, A.D., 2015. TOM REID MAYOR RESOLUTION NO. R2015-136 ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY LOWER KIRBY PEARLAND MANAGEMENT DISTRICT c/o Allen Boone Humphries Robinson LLP 3200 Southwest Freeway, Suite 2600 Houston, Texas 77027 August 10, 2015 City Manager City of Pearland, Texas 3519 Liberty Drive Pearland, TX 77581 Resolution No. R2015-136 Exhibit "A" Re: Financing for the design and construction of the Regional Drainage Plan Lateral No. 1 To Whom it may concern: Lower Kirby Pearland Management District (the "District") and THE CITY OF PEARLAND, TEXAS (the "CITY") entered into a Financing Agreement (the "Agreement") dated February 6, 2014, to provide for the financing and construction of facilities to serve land within the District. The District and the City have determined to proceed with the design and construction of the Regional Drainage Plan Lateral No. 1 (the "Project) in accordance with the Agreement. The City will pre -finance payments to the District related to design of the Project in the amount of $219,296.00 as outlined in the proposal from LJA Engineering, Inc., which is attached hereto as Exhibit "A", and construction of the Project in the amount of $1,565,500.00 awarded to Meiners Construction, Inc. as outlined in the bid tabulation, which is attached hereto as Exhibit "B", and the District agrees to reimburse the City pursuant to the terms of the Agreement. This agreement was duly authorized at a meeting of the Board of Directors of the District held on the 10th day of August, 2015. Very truly yours, LOWKIRBY PEARLAND MANAGEMENT DISTRICT By: \. ,45st I cf., President, Bo /d of Directors AGREED TO AND ACCEPTED this 1 0 day of August , 2015 550914 EXHIBIT A LJA Engineering, Inc. 2929 Bnarpark Drive Suite 600 Houston Texas 77042 TBPE NQ F 1386 Phone 713 953 5200 Fax 713 953 5026 www Itaengrneenng corn TBPLS Ns 10110501 July 14, 2015 PROPOSAL Mr. Ron Dagley - President Lower Kirby Pearland Management District c/o Allen Boone Humphries Robinson LLP Phoenix Tower 3200 Southwest Freeway, Suite 2600 Houston, Texas 77027 Re: South Spectrum Phase I — Box Culverts City of Pearland, Texas LJA Proposal No. 15-00974 Dear Mr. Dagley: LJA Engineering, Inc. (LJA) is pleased to submit this proposal for the following services for the South Spectrum Phase 1 — Box Culverts in accordance with the terms and conditions set forth in the Engineering Services Agreement dated, February 6, 2014. SCOPE OF SERVICES Phase Description FEE Basic Services for Design and Construction Administration 402 Preliminary Design ($ 1,327,534 x 7.3% x 25%) 403 Final Design ($ 1,327,534 x 7.3% x 50%) 410 Approvals ($ 1,327,534 x 7.3% x 10%) 411 Bidding or Negotiation ($ 1,327,534 x 7.3% x 5%) 412 Construction Phase ($ 1,327,534 x 7.3% x 10%) Surveying 205 Design Survey (2.0% of Const. Cost) 208 Control Staking (1.0% of Const. Cost) 409 Project Representative (3.5% of Const. Cost) Additional Services 413 Storm Water Pollution Prevention Plan 414 Geotechnical Study 415 Construction Testing Services 416 Environmental Services Z99 Reimbursable Expenses (Estimated) TOTAL $ 24,227 $ 48,454 $ 9,690 $ 4,845 $ 9,690 $ 26,551 $ 13,275 $ 46,464 $ 5,000 $ 10,000 $ 15,000 $ 1,100 $ 5,000 $ 219,296 This fee includes an estimated amount of $5,000.00 for the reimbursable expenses. This budget will be used for the actual expenses incurred on the project including bid advertisement, printing, mileage, etc. This proposal does not include Right-of-Way/Easement acquisition services or environmental services. O:\PROPOSAL\20151Lower Kirby\PED\15-00974 South Spectrum Phase I.doc Mr. Ron Dagley July 14, 2015 Page 2 of 2 We appreciate the opportunity to submit this proposal and look forward to working with you on this project. If you should have any questions or require additional information, please do not hesitate to contact me at 713.953.5096. Sincerely, (;L James D. Ross, PE Vice President JDR/ew O:\PROPOSAL12015\Lower Kirby\PED115-00974 South Spectrum Phase I.doc EXHIBIT B BID TABULATION FOR: BID OPENING DATE: BID OPENING LOCATION: TABULATION BY: TABULATION DATE: LJA JOB NO. BIDDERS NAME 1) MEINERS CONSTRUCTION. INC. 2) TRIPLE B SERVICES. L.L P. 3) SLACK 6 CO. COMPANY. INC. 4) B5 CONSTRUCTION COMPANY, INC. 51 MONARCH CIVIL CONSTRUCTORS, LLC 61 R CONSTRUCTION COMPANY 71 C.E. BARKER. LTD 81 MENADE, INC. 91 CROSTEX CONSTRUCTION, INC. CALENDAR DAYS - 65/75 CONSTRUCTION Of THE SOUTH SPECTRUM PHASE CNE BOX CUI. VERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CITY Of PEARLAND HARRIS COUNTY. TEXAS AUGUST 7.2015 LJA ENGINEERING. INC. S. ROSS AUGUST 10.2015 22.09-1502 19.21 TOTAL BID AMOUNT 51.585.500.00 $1.596.884.35 31,631,571.84 ' 51,745,313.00 51,748,238.60 $1,614,077.40 51.994.731.38 $2.114,644.00 $2.621.404.50 • E %of% rF ;) r5'�P� ••his, .) •JAMES D. ROSS i i I t • ° •0 89452 : ic�w r%GA.•••�/CENSEO E ....= ,,,,0 .O.- 8- to -is ' MATHEMATICAL ERROR Patti I of 7 BID TABULATION FOR: BID OPENING DATE: BID OPENING LOCATION: TABULATION BY: TABULATION DATE: WA JOB NO. ITEM DESCRIPTION DRAINAGE FACILITIES ITEMS 1. MOBIUZATION FOR EXISTING DITCH OEMUCKING AND CLEAN OUT, COMPLETE IN PLACE 2. DEMUCK EXISTING CONVEYANCE DITCH AND RE-ESTABLISH DITCH AT A 0.05% SLOPE WITH 6' BOTTOM WIDTH AND 4.1 SIDE SLOPES FROM ENDING FLOWUNE OF EXISTING BOX CULVERTS TO EXISTING TXDOT DITCH. COMPLETE IN PLACE 3. MOBILIZATION FOR CONSTRUCTION OF STORM BOX CULVERTS, COMPLETE IN PLACE 4. 24' RCP STORM SEWER, ALL CUTS. TO INCLUDE BEDDING 8 BACKFILL., COMPLETE IN PLACE 5. 30' RCP STORM SEWER EQUALIZER PIPE, All CUTS. TO INCLUDE BEDDING & BACKFILL, COMPLETE IN PLACE 6. B'X8 RCB STORM SEWER, TO INCLUDE BEDDING AND BACKFILL, COMPLETE IN PLACE 7. TRENCH SAFETY SYSTEM, ALL DEPTHS, COMPLETE IN PLACE 8. 8' BRICK PLUG FOR 24' STORM SEWER, COMPLETE IN PLACE 9. TYPE MANHOLE TOPS FOR 47 STORM SEWER 8 SMALLER. ALL DEPTHS. TO BE CONSTRUCTED ON TOP Of 8'X8' RCB STORM SEWER, TIE INTO RCB STEEL. COMPLETE IN PLACE 0. CONNECT PROPOSED 24' STORM SEWER TO SIDE OF PROPOSED 8'X8' RGR STORM SEWER WITH CONCRETE COLLAR, COMPLETE IN PLACE 11. CONNECT PROPOSED 30 STORM SEWER EQUALIZER PIPE TO SIDE Of PROPOSED B'XB' RCE STORM SEWER WITH CONCRETE COLLAR, COMPLETE IN PLAGE 12. CONNECT PROPOSED 8'X8' RCB STORM SEWER TO EXISTING 8'XB' RCB STORM SEWER, EXPOSE 18' OF EXISTING BOX REINFORCEMENT AND TIE PROPOSED BOX TO EXISTING AND CONNECT WITH CONCRETE COLLAR. COMPLETE IN PLACE 13. EXCAVATION, HAULING, AND COMPACTION OF FILL FROM LOWER KIRBY DETENTION POND TO EXISTING CONVEYANCE DITCH CHANNEL. ON ROAD TRUCKS REQUIRED. AS INDICATED ON PLANS. COMPLETE IN PLACE 14. INSTALLATION OF CONCRETE HEADWALL WITH PARALLEL WINGS FOR BOX CULVERTS. PER TXDOT DETAIL (SEE CONSTRUCTION PLAN SHEET 17), COMPLETE IN PLACE. 15. REMOVAL AND DISPOSAL OF EXISTING CONCRETE HEADWALL WITH PARALLEL WINGS, COMPLETE IN PLACE 16. REMOVAL AND DISPOSAL OF EXISTING BACKSLOPE INTERCEPTOR STRUCTURE, INCLUDING 24' CGMP STORM SEWER, 5' ARTICULATED BLOCK, AND CONCRETE PAD, COMPLETE IN PLACE 17. DEMUCK AND FILL EXISTING BACKSLOPE SWALES, COMPLETE IN PLACE 18. 5' ARTICULATED BLOCK EROSION CONTROL AT OUTFALL OF 8'X8 ACE STORM SEWER. COMPLETE IN PLACE SUBTOTAL DRAINAGE FACILITIES ITEMS MISCELLANEOUS ITEMS 1. STORM WATER POLLUTION PREVENTION PLAN COMPUANCE INCLUDING MAINTAIMNG EXISTING FILTER FABRIC FENCE AND STABIUZED CONSTRUCTION EXIT. COMPLETE IN PLACE 2 STABILIZED CONSTRUCTION EXIT AT LOCATION SHOWN ON PLANS, TO INCLUDE INSTALLATION AND REMOVAL, (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE 3. FILTER FABRIC FENCE ALONG BOUNDARY BEFORE CONSTRUCTION STARTS. (AS DIRECTED BY THE ENGINEER), COMPLETE IN PLACE CONSTRUCTION OF THE SOUTH SPECTRUM PHASE ONE BOX CULVERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CITY OF PEARLANO HARRIS COUNTY, TEXAS AUGUST 7.2015 WA ENGINEERING. INC. S. ROSS AUGUST 10.2015 2209.1502 19.2) 1) MEINERS CONSTRUCTION, INC. 2) TRIPLE 8 SERVICES. L.L.P. UNIT OTY UNIT COST TOTAL COST UNIT COST TOTAL COST LS $15,000.00 LF 1315 58.00 LS 1 533,434.00 LF 48 $75.00 LF 10 $85.00 LF 2.076 $600.00 LF 2,134 51.00 EA 4 $300.00 EA 2 $1200.00 EA 4 $300.00 EA 6 5300.00 EA 2 58,500.00 CY 30.000 515.000.00 $10,520.00 $33,434.00 $3,600.00 $850.00 51,245,600.00 $2,134.00 $1.200.00 $2,400.00 $1200.00 $1,800.00 517,000.00 $2.75 582,500.00 LS 570.000.00 LS $15,000.00 EA 3 5700.00 LF 1,837 SY 40 LS EA 2 LF 2.740 $70,000.00 $16.000.00 $2.100.00 $1.00 $1,837.00 $130.00 $5,200.00 $1,511,175.00 $1,800.00 $1,600.00 $2,000.00 $4,000.00 5125 $3,425.00 ' MATHEMATICAL ERROR Page 2 of 7 S10,000.00 $13.75 $15,000.00 $125.00 590.00 S550.00 $0.15 $625.00 $3,950.00 $1,900.00 $1,855.00 $4,360.00 $8.85 $75,000.00 $2,050.00 $560.00 35.00 575.00 $1,500.00 53,500.7.0 $1 20 3) SLACK 8 CO. COMPANY, INC. UNIT COST TOTAL COST $ 10,000.00 510,390.00 $18,081.25 $15.00 $15,000.00 $10,390.00 $8,000.00 $262.08 S900.00 $483.00 SI,141,800.00 $548.00 S320.10 $0.50 52,500.00 $10.00 $7,900.00 $3,413.00 $7,600.00 $125.00 $11,130.00 $250.00 $8,700.00 55.380.00 $205,500.00 $9.20 S75,000.00 $21.190.00 S2.050.00 521,950.00 $1,680.00 51.520.00 59,185.00 $5.00 $3,000.00 $128.00 51,526,346.35 $1,500.00 S+,165,00 $7,000.00 52,058.00 $3,288.00 $1 00 $10,390.00 519,725.00 $10,390.00 $12,579.84 • $4,830.00 $ 1,137,648.00 $1,067.00 $40.00 56,826.00 $500.00 $1,500.00 $10,780.00 S276.000.00 $21,190.00 $21,950.00 $4,560.00 $9,185.00 $5,120.00 $1554,280.84 • $1,165.00 54,118.00 $2,740.00 FAN F1Jl1 E'9. K 0 1.41.C4X4220). •942.44O,S l4`w R+?. ND Sale SpMan M 1 M CA., ST +Y BID TABULATION FOR: BID OPENING DATE: BID OPENING LOCATION: TABULATION BY: TABULATION DATE: LJAJOB NO. ITEM DESCRIPTION 4. BROADCAST SEEDING. FERTILIZING, AND WATERING OF EXCAVATION AND FILL AREAS, (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE 5. TURF ESTABLISHMENT OF DISTURBED SIDE SLOPES ON EXISTING DITCH ON COMPLETION OF CONSTRUCTION, COMPLETE IN PLACE 8. STAGE II - INLET PROTECTION BARRIER (4 SAND BAGS PER INLET) FOR EXISTING INLETS, COMPLETE IN PLACE 7. CONCRETE TRUCK WASHOUT PIT. INCLUDES MAINTENANCE AND REMOVAL. COMPLETE IN PLACE 8. ADDITIONAL COST FOR STORM SEWER BEDDING S BACKFILL FOR UNSATISFACTORY SOIL CONDITIONS, ALL SIZES AND DEPTHS (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE 9 DEWATERING, ALL SIZES & DEPTHS. (TO BE USED ONLY AT THE WRITTEN DIRECTION OF TIE ENGINEER). COMPLETE IN PLACE 10. EXTRA CEMENT STABILIZED SAND. (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE 11 TEMPORARY TRAFFIC CONTROL FOR ON•ROAD TRUCK HAULING OF FILL MATERIAL, FOR BOX CULVERT CONNECTION, AND FOR HEADWALL REMOVAL, COMPLETE IN PLACE 12. CLEARING OF EXCAVATION AREA. TO INCLUDE CHIPPING AND HAULING OF ALL MATERIAL, COMPLETE IN PLACE SUBTOTAL MISCELLANEOUS ITEMS BID SUMMARY SUBTOTAL DRAINAGE FACILITIES ITEMS SUBTOTAL MISCELLANEOUS ITEMS TOTAL AMOUNT BID CONSTRUCTION OF THE SOUTH SPECTRUM PHASE ONE BOX CULVERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CITY OF PEARLAND HARRIS COUNTY. TEXAS AUGUST 7, 2015 UA ENGINEERING, INC. S ROSS AUGUST 10.2015 2209.1502 (9.21 1) DINERS CONSTRUCTION. INC. UNIT OTY UNIT COST TOTAL COST AC 2.5 5900.00 52250.00 LS 1 56,500.00 58,500.00 EA 2 525.00 550.00 LS 1 5760.00 5750.00 LF 500 515.00 $7.500.00 LF 500 525.00 312,500.00 CY 200 320.00 54.000 00 LS 1 51.000.00 $1.000.00 AC 2.5 44,300.00 510.750.00 $64,326.00 • MATHEMATICAL ERROR Paps 3 cl 7 31,511,1 75.00 $54,325.00 $1,566,500.00 2) TRIPLE B SERVICES, L.LP. UNIT COST $600.00 53,500.00 585.00 5850.00 515.00 525.00 $20.00 515,000.00 $5,500.00 3) SLACK 8 CO. COMPANY, INC. TOTAL COST UNIT COST TOTAL COST 51,500.00 51,824.00 54,560.00 53,500.00 55,000.00 55,000.00 5130,00 5150.00 5300.00 5850.00 $760.00 $763.00 57,500.00 $38.00 519,000.00 512.500.00 325.00 512,500.00 34,000.00 438.00 $7,600.00 515.000.00 52,000.00 52,000.00 513.750.00 57.02800 517,570.00 $70,518.00 377.311.00 $1,526,348.35 570,518.00 $1,696,864.36 51,554,260.84 • $77,311.00 31,691,571.64 ' FAN F '144 W Erowng " 0 tu4W200?2:S 'D70607. Loom uey LID bun Spcvn Pn+Ib CdoWle,BTAs BID TABULATION FOR: BID OPENING DATE: BID OPENING LOCATION: TABULATION BY: TABULATION DATE: WA JOB NO. ITEM DESCRIPTION DRAINAGE FACILITIES ITEMS 1. MOBILIZATION FOR EXISTING DITCH DEMUCKING AND CLEAN OUT. COMPLETE IN PLACE 2. DEMUCK EXISTING CONVEYANCE DITCH AND RE-ESTABLISH DITCH AT A 0.05% SLOPE WITH E BOTTOM WIDTH AND 4:1 SIDE SLOPES FROM ENDING FLOWUNE OF EXISTING BOX CULVERTS TO EXISTING TXDOT DITCH, COMPLETE IN PLACE 3. MOBILIZATION FOR CONSTRUCTION OF STORM BOX CULVERTS, COMPLETE IN PLACE 4. 24' RCP STORM SEWER. ALL CUTS. TO INCLUDE BEDDING & BACKFILL. COMPLETE IN PLACE 5. 30' RCP STORM SEWER EQUALIZER PIPE. ALL CUTS, TO INCLUDE BEDDING 8 BACKFILL, COMPLETE IN PLACE 8. 8'X8' RCS STORM SEWER. TO INCLUDE BEDDING AND BACKFIL.L, COMPLETE IN PLACE 7. TRENCH SAFETY SYSTEM. ALL DEPTHS. COMPLETE IN PLACE 8. 8' BRICK PLUG FOR 24' STORM SEWER, COMPLETE IN PLACE 9. TYPE MANHOLE TOPS FOR 42- STORM SEWER 8 SMALLER, ALL DEPTHS. TO BE CONSTRUCTED ON TOP OF 8'X8' RCB STORM SEWER, TIE INTO RCB STEEL, COMPLETE IN PLACE 10. CONNECT PROPOSED 24' STORM SEWER TO SIDE OF PROPOSED AXE RCB STORM SEWER WITH CONCRETE COLLAR, COMPLETE IN PLACE t 1. CONNECT PROPOSED 30' STORM SEWER EQUALIZER PIPE TO SIDE OF PROPOSED 9'X8' RCA STORM SEWER WITH CONCRETE COLLAR, COMPLETE IN PLACE 12. CONNECT PROPOSED 87(8' RCB STORM SEWER 10 EXISTING 6'X8' RCE STORM SEWER, EXPOSE 18' OF EXISTING BOX REINFORCEMENT AND TIE PROPOSED BOX TO EXISTING AND CONNECT WITH CONCRETE COLLAR, COMPLETE IN PLACE 13. EXCAVATION. HAULING. AND COMPACTION OF FILL FROM LOWER KIRBY DETENTION POND TO EXISTING CONVEYANCE DITCH CHANNFt, ON ROAD TRUCKS REQUIRED. AS INDICATED ON PLANS, COMPLETE IN PLACE 14. INSTALLATION OF CONCRETE HEADWALL WITH PARALLEL WINGS FOR BOX CULVERTS, PER TXDOT DETAIL (SEE CONSTRUCTION PLAN SHEET 17), COMPLETE IN PLACE 15 REMOVAL AND DISPOSAL OF EXISTING CONCRETE HEADWALL WITH PARALLEL WINGS. COMPLETE IN PLACE 18. REMOVAL AND DISPOSAL OF EXISTING BACKSLOPE INTERCEPTOR STRUCTURE. INCLUDING 24' CGMP STORM SEWER, 5' ARTICULATED BLOCK. AND CONCRETE PAD. COMPLETE IN PLACE 17. DEMUCK AND FILL EXISTING BACKSLOPE SWALES. COMPLETE IN PLACE 18. 5' ARTICULATED BLOCK EROSION CONTROL AT OUTFALL OF 8'X8' RCB STORM SEWER, COMPLETE IN PLACE SUBTOTAL DRAINAGE FACILITIES ITEMS MISCELLANEOUS ITEMS 1. STORM WATER POLLUTION PREVENTION PLAN COMPUANCE INCLUDING MAINTAINING EXISTING FILTER FABRIC FENCE AND STABILIZED CONSTRUCTION EXIT, COMPLETE IN PLACE 2. STABILIZED CONSTRUCTION EXIT AT LOCATION SHOWN ON PLANS, TO INCLUDE INSTALLATION AND REMOVAL, (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE 3. FILTER FABRIC FENCE ALONG BOUNDARY BEFORE CONSTRUCTION STARTS, (AS DIRECTED BY THE ENGINEER), COMPLETE IN PLACE CONSTRUCTION OF THE SOUTH SPECTRUM PHASE ONE BOX CULVERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CITY OF PEARLAND HARRIS COUNTY, TEXAS AUGUST 7, 2015 LIA ENGINEERING, INC. S. ROSS AUGUST 10.2015 22091502 (9.2) 4) 8.5 CONSTRUCTION COMPANY, INC. UNIT OTY UNIT COST TOTAL COST LS 52500.00 LF 1315 $12.00 LS $5.000.00 LF 48 $110.00 LF 10 $180.00 LF 2,076 $550.0) LF 2.134 $1.00 EA 4 5400.00 EA 2 $1,900.00 EA 4 $1,800.00 EA 6 $1,800.00 EA 2 $10,000.00 CY 30,000 $2.500.00 $15,780.00 $5,000.00 $5280.00 S1,800.00 $1,141,800.00 $2,134.00 $1,600.00 $3,800.00 $7,200.00 $10,800.00 $20.000.00 $13.00 $390.000.00 LS 657.000.00 LS $8,500.00 EA 3 $1.500.00 LF 1,837 67.00 SY 40 5125.00 LS $2,500.00 EA 2 $2,300.00 LF 2.740 S1.50 • MATHEMATICAL ERROR Pogo 4 01 7 $57,000.00 $8,500.00 $4500.00 512,859.00 $5,000.00 $1,895,363.00 $2,500.00 54,600.00 54.110.00 5) MONARCH CIVIL CONSTRUCTORS, LLC UNIT COST TOTAL COST $6.000.00 $11.00 $6.000.00 $104.00 $139.00 $632.00 $0.40 $350.00 $2,144.00 $400.00 $500.00 $4201.00 $6,000.00 $14,465.00 $6,000.00 $4,992.00 $1,390.00 51,312,032.00 $853 60 51,400.00 54,288.00 $1,600.00 $3,000.00 58562.00 $7.50 5225.000.00 590,037.00 $9,500.00 $700.00 56.00 $103.00 51,500.00 51250.00 51.00 $80,037.00 59500.00 $2,100.00 $11,022.00 $4,120.00 81,898,381.60 S1.500.00 $2.500.00 52.740.00 6) R CONSTRUCTION COMPANY UNIT COST TOTAL COST $80,000.00 $80,000.00 $40.00 552,800.00 $25,000.00 $25,000.00 $100.00 $4.800.00 $200.00 $2,000.00 5620.00 51287.120.00 $0.10 5213.40 5500.00 52.000.00 64.000 00 $8.000.00 $500.00 $800.00 54,000.00 $6.00 $70.000.00 $3,500.00 $1.000.00 $5.00 5150.00 $4,000.00 $3,000.00 $3.00 $2,000.00 $4,800.00 $8,000.00 5180,000.00 $70,000.00 $3,500.00 53,000 00 $9,185.00 66.000.00 $1,749,218.40 $4,000.00 $8,000.00 $8220.00 FnN =.,546 :,w fw*mny ,s 0,AND,7Ng7,VN 15070:1715 Laws KA* GC Ea.,. Spero, ^A , ppl fnMla,4i r BID TABULATION FOR: BID OPENING DATE: BID OPENING LOCATION: TABULATION BY: TABULATION DATE: LJA JOB NO. ITEM DESCRIPTION 4. BROADCAST SEEDING, FERTILIZING, AND WATERING OF EXCAVATION AND FILL AREAS, (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE 5. TURF ESTABLISHMENT OF DISTURBED SIDE SLOPES ON EXISTING DITCH ON COMPLETION OF CONSTRUCTION. COMPLETE IN PLACE 6. STAGE II - INLET PROTECTION BARRIER (4 SAND BAGS PER INLET) FOR EXISTING INLETS. COMPLETE IN PLACE 7. CONCRETE TRUCK WASHOUT PIT, INCLUDES MAINTENANCE AND REMOVAL. COMPLETE IN PLACE 8. ADDITIONAL COST FOR STORM SEWER BEDDING & BACKFILL FOR UNSATISFACTORY SOIL CONDITIONS, ALL SIZES AND DEPTHS (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE 9 DEWATERING, ALL SIZES 6 DEPTHS, (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER). COMPI.ETE IN PLACE 10. EXTRA CEMENT STABILIZED SAND. ITO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER). COMPLETE IN PLACE 11. TEMPORARY TRAFFIC CONTROL FOR ON -ROAD TRUCK HAULING OF FILL MATERIAL. FOR BOX CULVERT CONNECTION. AND FOR HEADWALL REMOVAL. COMPLETE IN PLACE 12. CLEARING OF EXCAVATION AREA, TO INCLUDE CHIPPING AND HAULING OF AL L MATERIAL, COMPLETE IN PLACE SUBTOTAL MISCELLANEOUS ITEMS BID SUMMARY SUBTOTAL DRAINAGE FACILITIES ITEMS SUBTOTAL MISCELLANEOUS ITEMS TOTAL AMOUNT BID CONSTRUCTION OF THE SOUTH SPECTRUM PHASE ONE BOX CULVERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CITY OF PEARLAND HARRIS COUNTY, TEXAS AUGUST 7. 2015 WA ENGINEERING. INC. S. ROSS AUGUST 10.2015 2209150219.2) 4) 6 5 CONSTRUCTION COMPANY. INC. UNIT OTY UNIT COST TOTAL COST UNIT COST AC 2.5 51,000.00 52,500.00 5600.00 LS EA 2 LS LF 500 LF 500 CY 200 LS 1 AC 2.5 $3,000 00 53.000.00 $50.00 5100.00 $ 700.00 5700.00 $15.00 57,500.00 $25.00 512.500.00 535.00 57,000.00 $1,700.00 $1,700.00 $1,500.00 53,750.00 $48,980.00 $1,695.353.00 $49,900.00 $1,745.313.00 • MATHEMATICAL ERROR Page 5 of 7 51 MONARCH CIVIL CONSTRUCTORS, LLC TOTAL COST 51.500.00 $1,400.00 $1,400.00 561.00 S122.00 5500.00 $500.00 $15.00 $7,500.00 $25.00 $12.500.00 $20.00 54,000.00 5165.00 58,865.00 $3,500.00 38,750.00 $61,877.00 31,606,361.60 551,877.00 $1,748,23$.60 6) R CONSTRUCTION COMPANY UNIT COST $800.00 55.000.00 $177.00 51,285.00 $15.00 S25.00 520.00 $5.000.00 54.000.00 TOTAL COST $2,000.00 55,000.00 5354.00 $1,285.00 $7,500.00 $12,500.00 $4,000.00 $5,000.00 $10,000.00 385,!59.00 $1,748,218.40 $65,859.00 $1,$14,077.40 rah r.,346 -A Egrer,r, K 0 11N4021pr.^.'Cpi1GTO rlE,,6w, MICr ND 6aM6pctvn rr Iq Cowls Si to BID TABULATION FOR: BID OPENING DATE: BID OPEMNG LOCATION: TABULATION BY: TABULATION DATE: LJA JOB NO. ITEM DESCRIPTION DRAINAGE FACILITIES ITEMS 1. MOBIUZATION FOR EXISTING DITCH DEMUCKING AND CLEAN OUT, COMPLETE IN PLACE 2. DEMUCK EXISTING CONVEYANCE DITCH AND REESTABLISH DITCH AT A 0.05% SLOPE WITH 6' BOTTOM WIDTH AND 4:1 SIDE SLOPES FROM ENDING FLOWLINE OF EXISTING BOX CULVERTS TO EXISTING TXDOT DITCH, COMPLETE IN PLACE 3. MOBIUZATION FOR CONSTRUCTION OF STORM BOX CULVERTS, COMPLETE IN PLACE 4. 24' RCP STORM SEWER, ALL CUTS. TO INCLUDE BEDDING & BACKFILL, COMPLETE IN PLACE 5. 30' RCP STORM SEWER E0UALI7FR PIPE. ALL CUTS, TO INCLUDE BEDDING & BACKFILL. COMPLETE IN PLACE 6. 8'X8' RCB STORM SEWER, TO INCLUDE BEDDING AND BACKFIL L. COMPLETE IN PLACE 7. TRENCH SAFETY SYSTEM. ALL DEPTHS, COMPLETE IN PLACE 8. 8' BRICK PLUG FOR 24' STORM SEWER, COMPLETE IN PLACE 9. TYPE 'C' MANHOLE TOPS FOR 42' STORM SEWER & SMALLER, ALL DEPTHS, TO BE CONSTRUCTED ON TOP OF 8'X8' RCB STORM SEWER. TIE INTO RCB STEEL, COUPLE IE IN PLACE 10. CONNECT PROPOSED 24' STORM SEWER TO SIDE OF PROPOSED 8'X8' RCB STORM SEWER WITH CONCRETE COLLAR, COMPLETE IN PLACE CONNECT PROPOSED 30' STORM SEWER EQUALIZER PIPE TO SIDE OF PROPOSED 8'X8' RCB STORM SEWER WITH CONCRETE COLLAR. COMPLETE IN PLACE 12. CONNECT PROPOSED 8'XB' NCB STORM SEWER TO EXISTING 8'X8' RCB STORM SEWER, EXPOSE 18' OF EXISTING BOX REINFORCEMENT AND TIE PROPOSED BOX TO EXISTING AND CONNECT WITH CONCRETE COLLAR. COMPLETE IN PLACE 13. EXCAVATION. HAUUNG, AND COMPACTION OF FILL FROM LOWER KIRBY DETENTION POND TO EXISTING CONVEYANCE DITCH CHANNEL. ON ROAD TRUCKS REOUIRED. AS INDICATED ON PLANS, COMPLETE IN PLACE 14. INSTALLATION OF CONCRETE HEADWALL WITH PARALLEL WINGS FOR BOX CULVERTS, PER TXOOT DETAIL (SEE CONSTRUCTION PLAN SHEET 17). COMPLETE IN PLACE 15. REMOVAL AND DISPOSAL OF EXISTING CONCRETE HEADWALL WITH PARALLEL WINGS. COMPLETE IN PLACE 16. REMOVAL AND DISPOSAL OF EXISTING BACKSLOPE INTERCEPTOR STRUCTURE. MCLUDING 24' CGMP STORM SEWER. 5' ARTICULATED BLOCK, AND CONCRETE PAD, COMPLETE IN PLACE CONSTRUCTION OF THE SOUTH SPECTRUM PHASE ONE BOX CULVERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CRY OF PEARLAND HARRIS COUNTY. TEXAS AUGUST 7. 2015 UA ENGINEERING, INC. S. ROSS AUGUST 10, 2015 2209.1502 (9.21 71 C.E. BARKER. LTD. UNIT OTY UNIT COST TOTAL COST LS 512,500.00 LF 1315 $10.20 LS 517.500.00 1.F 40 593.51 LF 10 $147.66 LF 2,076 $643.04 LF 2,134 50.12 FA 4 $367.20 EA 2 $4,304.40 FA 4 EA 8 EA 2 CV 30.000 LS LS 1 EA 3 17. DEMUCK AND FILL EXISTING BACKSLOPE SWALES, COMPLETE IN PLACE LF 18. ARTICULATED BLOCK EROSION CONTROL AT OUTFALL OF 8-X8 RCS STORM SEWER, SY COMPLETE IN PLACE SUBTOTAL DRAINAGE FACILITIES ITEMS MISCELLANEOUS ITEMS 1. STORM WATER POLLUTION PREVENTION PLAN COMPLIANCF INCLUDING MAINTAINING LS EXISTING FILTER FABRIC FENCE AND STABILIZED CONSTRUCTION EXIT, COMPLETE IN PLACE 2. STABILIZED CONSTRUCTION EXIT AT LOCATION SHOWN ON PLANS, TO INCLUDE EA 2 INSTALLATION AND REMOVAL, (TO BE USED ONLY AT TIIF WRITTEN DIRECTION Of THE ENGINEER), COMPLETE IN PLACE 3. FILTER FABRIC FENCE ALONG BOUNDARY BEFORE CONSTRUCTION STARTS, lAS Lf 2,740 DIRECTED BY THE ENGINEER), COMPLETE IN PLACE 52.937.60 53,304.80 $4.590.00 8) MENADE. INC. 9) CROSTEX CONSTRUCTION. INC. UNIT COST TOTAL COST UNIT COST TOTAL COST $12.500.00 35,000.00 $5,000.00 $7,500.00 $7.500.00 $13,413.00 $40.00 $52,800.00 S12.00 $15.780.00 $17,500.00 $100,000.00 $100,000.00 57,500.00 $7,500.00 $4,488.48 5100.00 $4,800.00 566.00 $3,168.00 $1,476.60 5150.00 31,500.00 $100.00 $1.000.00 51,334,951.04 5710.00 $1,473,980.00 $950.00 $1,972,200.00 $256.08 51.00 $2.134.00 $1.25 $2,887.50 $1,468.80 5500.00 $2,000.00 5250.00 51,000.00 $8,608.80 52,500.00 55,000 00 $2.500.00 $5.000.00 $11,750.40 $1,000.00 $4,000.00 $1,500.00 66.000.00 $19,828.80 $1,000.00 $6,000.00 $1,750.00 510.500.00 59,180.00 $5,000.00 510.000.00 55,000.00 510.000.00 $9.04 3271.200.00 59.00 $270,000.00 $10.50 $315,000.00 $122,846.76 5122.846.76 $80,000.00 $80.000.00 580,000.00 $80,000.00 $44,880.00 $44,880.00 $10,000.00 $10.000.00 $25,000.00 $25,000.00 31.346.40 $4,039.20 $1,000.00 53,000.00 57,600.00 $22500.00 1.837 $10.20 $18.737.40 510.00 318.370.00 512.00 522,044.00 40 $120.57 $4.822.80 5100.00 $4,000.00 5150.00 56,000.00 $1,901,948.18 $2,062,384.00 5612.00 $1,836.00 $1.71 • MATHEMATICAL ERROR Page 6 01 7 5612.00 53,672 00 54,685.40 5500.00 $1,000.00 $2.00 $500.00 $1,500.00 52.000.00 31,500.00 55.480.00 $1.50 $2,612.869.50 • $1,500.00 $3.000.00 34.110.00 FAN F 1711 I,010DIOIvq K , LANC22092X0,507000115.LLo K b1 MO Swf, 6,.1,1 WI. p, I b.,t 1,A.1t AT a BID TABULATION FOR: BID OPENING DATE: BID OPENING LOCATION: TABULATION BY: TABULATION DATE: LJA JOB NO. ITEM DESCRIPTION 4. BROADCAST SEEDING, FERTILIZING. AND WATERING OF EXCAVATION AND FILL AREAS. (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE 5 TURF ESTABLISHMENT OF DISTURBED SIDE SLOPES ON EXISTING DITCH ON COMPLETION OF CONSTRUCTION. COMPLETE IN PLACE 8. STAGE II - INLET PROTECTION BARRIER (4 SAND BAGS PER INLET) FOR EXISTING INLETS, COMPLETE IN PLACE 7. CONCRETE TRUCK WASIIOUT PIT. INCLUDES MAINTENANCE AND REMOVAL. COMPLETE IN PLACE 8. ADDITIONAL COST FOR STORM SEWER BEDDING 6 BACKFILL FOR UNSATISFACTORY SOIL CONDITIONS, ALL SIZES AND DEPTHS (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE 9. DEWATERING, ALL SIZES 5 DEPTHS, (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER). COMPLETE IN PLACE 10. EXTRA CEMENT STABILIZED SAND, (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER). COMPLETE IN PLACE 11. TEMPORARY TRAFFIC CONTROL FOR ON -ROAD TRUCK HAULING OF FILL MATERIAL, FOR BOX CULVERT CONNECT ION, AND FOR HEADWALL REMOVAL, COMPLETE IN PLACE 12. CLEARING OF EXCAVATION AREA. TO INCLUDE CHIPPING AND HAULING OF ALL MATERIAL. COMPLETE IN PLACE SUBTOTAL MISCELLANEOUS ITEMS BID SUMMARY SUBTOTAL DRAINAGE FACILITIES ITEMS SUBTOTAL MISCELLANEOUS ITEMS TOTAL AMOUNT BID • MATHEMATICAL ERROR CONSTRUCTION OF THE SOUTH SPECTRUM PHASE ONE BOX CULVERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CITY OF PEARLAND HARRIS COUNTY, TEXAS AUGUST 7, 2015 LJA ENGINEERING. INC S. ROSS AUGUST 10.2015 2209-15021921 71 G.E. BARKER, LTD. 8) MENAGE, INC. UNIT CITY UNIT COST TOTAL COST UNIT COST TOTAL COST AC 2.5 5918.12 52295.30 51,000.00 52,500.00 LS 53,672.12 53,672.12 55,000.00 $5,000.00 EA 2 561.20 $122.40 $100.00 $200.00 LS $1224.00 $1,224.00 $100.00 $100.00 LF 500 515.00 S7,500.00 $15.00 57,500.00 LF 500 525.00 312,500.00 525.00 $12,500.00 CY 200 520.00 $4,000.00 $20.00 $4,000.00 L S 525,000.00 $25,000.00 $5,000.00 $5,000.00 AC 2.5 $11,000.00 $27,500.00 $7,000.00 $17,500.00 $92,783.22 $52,280.00 51,901,948.16 S2,052.364.00 $92,78322 $62.280.0i $1,994,731.35 $2,114,544.00 91 CROSTEX CONSTRUCTION, INC. UNIT COST TOTAL COST 51.000.00 52,500.00 $10.00000 5200.00 $750.00 $20.00 535.00 $25.00 $10,000.00 SI 7,550.00 $10,000 00 $400.00 $750 00 $10,000.00 $17,500.00 55,000.00 510,000.00 $43.875.00 $108,835.00 52,512,859.50 ' $108,635.00 $2,821,494.50 • 1111; i.,]16 W Hpuw7. e Page 7 o1 7 oYNtl17. •220. tROCOO,I6 law MO Co. ve, eaCw0 a*.+s Resolution No. R2015-136 Exhibit "A" REIMBURSEMENT AGREEMENT This Agreement is entered into this 10th day of August, 2015, by and between the CITY OF PEARLAND, TEXAS (hereinafter "City"), and the Pearland Economic Development Corporation (hereinafter "PEDC"). WHEREAS, the PEDC is a Type B economic development corporation, created pursuant to Chapter 505 of the Texas Local Government Code, as amended; and WHEREAS, the City and PEDC desire the construction of the Kirby Ditch Improvements Lateral Ditch No. 1 (hereinafter "Improvements"); and WHEREAS, the Improvements represent an infrastructure project located within the boundaries of the Lower Kirby Pearland Management District ("LKPMD"); and WHEREAS, Section 501.103 of the Texas Local Government Code (hereinafter "Code"), in pertinent part, defines the term "project" to mean "expenditures that are found by the board of directors to be required or suitable for infrastructure necessary to promote or develop new or expanded business enterprises, limited to: (1) streets and roads, rail spurs, water and sewer utilities, electric utilities, or gas utilities, drainage, site improvements, and related improvements; (2) telecommunications and Internet improvements ..."; and WHEREAS, the PEDC desires to fund the construction of the Improvements; and WHEREAS, the City can receive eligible reimbursements from the LKMMD for the costs associated with the Improvements; and WHEREAS, PEDC approved funding the Improvements for the City at its August 10, 2015, Board of Directors' meeting, after conducting a public hearing on the project; and WHEREAS, City and PEDC desire an agreement to set forth their respective responsibilities with regard to the Improvements and reimbursement of said costs. WITNESSETH: NOW THEREFORE, in consideration of the foregoing premises and other good and valuable consideration the receipt and sufficiency of which is hereby acknowledged, it is hereby agreed as follows: 1. LKPMD shall be responsible for designing, bidding, and constructing the Improvements more accurately described in Exhibit "A" attached hereto. i 2. Upon the approval of the plans and specifications by City, LKPMD shall obtain competitive line item bids in accordance with applicable State codes for the construction of the Improvements. LKPMD shall review the bids and award a contract to the lowest responsible bidder. 3. The total cost of the Improvements is $1,784,796, as itemized in Exhibit "B" attached hereto. PEDC shall fund an amount equal to the actual cost of the Improvements ("PEDC Participation Amount"), which shall be paid to City in installments or a lump sum amount. The timing and amount of the payment shall be determined at sole discretion of the City, but in no event shall the total payments exceed the actual cost of the Improvements. 4. This Agreement shall be contingent upon City and LKPMD entering into a Financing Agreement whereby City agrees to pre -finance the Improvements in return for LKMMD's agreement to reimburse the City for the costs associated with the Improvements ("Reimbursable Fund Payment"). Within 90 days following City's receipt of the Reimbursable Fund Payment from LKMMD that is attributable to the Improvements, City shall make payment to PEDC, in an amount equal to the Reimbursable Fund Payment, as reimbursement for the PEDC Participation Amount. 5. The initial term of this Agreement shall be for a period of eighteen (18) months, commencing on the 10th day of August, 2015, and may be renewed as needed until the Improvements are substantially complete. 6. This Agreement may only be amended, modified, or supplemented by written agreement and signed by both parties. 8. No assignment by a party hereto of any rights under or interests in this agreement will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. 9. Nothing herein is intended to supersede or waive any City ordinance or regulation pertaining to such construction. 10. Whenever possible, each provision of this Agreement shall be interpreted in such manner as to be effective and valid under applicable law, but if any provision of this Agreement is prohibitive or invalid under applicable law, such provision shall be ineffective to the extent of such provision or invalidity, without invalidating the remainder of such provision or the remaining provisions of this Agreement. 11. This Agreement shall be construed and enforced in accordance with and governed by the laws of the State of Texas. 12. To accomplish execution of this Agreement, it may be executed in multiple counterparts. 13. The Parties agree that any suit arising out of or related to this Agreement shall be filed in Brazoria County Texas. 14. All notices which are required or may be given pursuant to this Agreement shall be in writing and shall be sufficient if delivered personally or by first class mail, postage prepaid, return receipt requested, or by a nationally recognized courier, to the parties and their attorneys at the addresses set out below or such other addresses as the parties or their attorneys may hereafter notify one another: If to City: If to PEDC: City of Pearland Attn: Clay Pearson, City Manager 3519 Liberty Drive Pearland, TX 77581 Pearland Economic Development Corporation Attn: Chairman 1200 Pearland Parkway, Suite 200 Pearland, TX 77581 Notice delivered in accordance with the terms hereof shall be effective upon receipt. In witness whereof, the parties have hereunto set their hands and signatures on the date first above mentioned. PEARLAND ECONOMIC DEVELOPMENT CORPORATION a Texas non-profit corpora on By: %r Rushi Patel Chair CITY OF PEARLAND, 3 a Texas cipal corporal ATTEST: g Lorfi Secret fPRLdlt By• C a ' earson, City Manager BID TABULATION FOR: BID OPENING DATE: BID OPENING LOCATION: TABULATION BY: TABULATION DATE: LJA JOB NO. ITEM DESCRIPTION 4. BROADCAST SEEDING. FERTILIZING. AND WATERING OF EXCAVATION AND FILL AREAS. (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE 5. TURF ESTABLISHMENT OF DISTURBED SIDE SLOPES ON EXISTING DITCH ON COMPLETION OF GONSIRUCNON, COMPIE-TE IN PLACE 6. STAGE II - INLET PROTECTION BARRIER (4 SAND BAGS PER INLET) FOR EXISTING INLETS, COMPI. FTF IN Pt ACE I, CONCRETE TRUCK WASHOUT PIT. INCLUDES MAINTENANCE AND REMOVAL, COMPLETE IN PLACE 0. ADDITIONAL COST FOR STORM SEWER BEDDING 8 BACKFILL FOR UNSATISFACTORY SOIL CONDITIONS. ALL SIZES AND DEPTHS (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER). COMPLETE IN Pt ACE 9. (*WATERING. ALL SIZES & DEPTHS. (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPI FIE IN PT ACE 10. EXTRA CEMENT STABILIZED SAND. (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE II TEMPORARY TRAFFIC CONTROL FOR ON ROAD TRUCK HAULING OF FILL MATERIAL, FOR BOX CULVERT CONNECTION. AND FOR HEADWALL REMOVAL, COMPLETE IN PLACE 12 CLEARING OF EXCAVATION AREA. TO !NCI TIDE' CHIPPING AND I ALIT ING UI ALL. MATERIAL. COMPLETE IN PI ACE SUBTOTAL MISCELLANEOUS ITEMS BID SUMMARY Sl1BT01 AL. DRAINAGE FACILITIES ITEMS SUBTOTAL MISCELLANEOUS ITEMS TOTAL AMOUNT BID CONSTRUCTION OF TILE SOUTH SPECTRUM PHASE ONE BOX CULVERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CITY OF PEARLAND HARRIS COUNTY, TEXAS AUGUST 7, 2015 LJA ENGINEERING. INC. S. ROSS AUGUST 10.2015 2209.1502 19.2) 7) C.E. BARKER. LID. UNIT OTY UNIT COST TOTAL COST AC 2.5 5918.12 52,295 30 LS S3.672.12 S3.672. 12 FA 2 561 20 5172 411 LS S1,224 00 51,224 00 LF 5011 515.00 57,500.00 LF 500 525.00 S'2.500 00 CY 20 520 00 54.00 0 LS 525.000 00 525.00.00 AC 2 5 S11,000 00 $27,500.0 ' MATHEMATICAL ERROR Page 7 oT $92,783.22 51,901,948.16 592.783.22 51,994,731.38 8) MENADE, INC UNIT COST TOTAL COST 51.000.00 52.500.0(1 91 CROSTE X CONSTRUCTION. INC. UNIT COST TOTAL COST 51,000.00 52,500.00 55.000.00 55,000.00 S10.000.00 510.000.00 S100.00 5200.00 5200.00 5400.00 5100.0(! S10.0 5750.00 575000 51500 57,500.00 520.00 510,000.00 $25.00 $12,500.00 535.00 517,500.00 520.0 54,00.0 S25.00 55,00000 55,00 00 55.000.0 S10.00.0 $10,(10.0 57,000.0 S17,50.0 SIT.550.0 543.875.0 $62,280.00 $109,635.0 52.057384.00 562,280.00 S2,114,644.00 52,512,859.50 • S108,635.00 $2,621,494.50 ' FPM F.114C 1.,. Enpner,W. me 0 LA1,D.t20 V0G ,6070807,6 .uonm M19p MO SM, Spam" Pn,9.Cw.af ST 00 BID TABULATION FOR: BID OPENING DATE: BID OPENING LOCATION: TABULATION BY: TABULATION DATE: LJA JOB NO. ITEM DESCRIPTION DRAINAGE FACILITIES ITEMS I. MOBILIZATION FOR EXISTING DITCH DEMUCKING AND CLEAN OUT. COMPLETE IN PLACE I S 2 DEMUCK EXISTING CONVEYANCE DITCH AND RE•FSTABL IS1I DITCH AT A 0.05%SLOPE LF WI H 6' BOTTOM WIDTH AND 4.1 SIDE SLOPES FROM ENDING FLOWLINE OF EXISTING BOX CULVERTS TO EXISTING TXDOT DITCH, COMPLETE IN PLACE 3 MOBILIZATION FOR CONSTRUCTION OF STORM BOX CULVERTS, COMPLETE IN PLACE 4 24' RCP STORM SEWER, ALL CUTS, TO INCLUDE BEDDING & BACKFILL. COMPLETE IN PLACE 5. 30' RCP STORM SEWER EQUALIZER PIPE, ALL CUTS. TO INCLUDE BEDDING & BACKFILL, COMPLETE IN PLACE LS IF LF 6 8'X8' RCP STORM SEWER, TO INCLUDE BEDDING AND BACKFILL. COMPL ETE IN PI ACE LF /. TRENCH SAFETY SYSTEM. ALL DEPTHS, COMPLETE IN PLACE LF 8. 8' BRICK PLUG FOR 24' STORM SEWER. COMPLETE IN PLACE EA 9 TYPE "C" MANHOLE TOPS FOR 42' STORM SEWER & SMALLER. ALL DEPTHS, TO BL LA CONSTRUCTED ON TOP OF 8 X8' RCB STORM SEWER. TIE INTO RCB STEEL, COMPLETE IN PLACE 10. CONNECT PROPOSED 24' STORM SEWER TO SIDE OF PROPOSED 8'X8' RCA STORM EA SEWER WITH CONCRETE COLLAR. COMPLETE IN PLACE 11. CONNECT PROPOSED 30' STORM SEWER EOUALIZER PIPE TO SIDE OF PROPOSED 8'XB' EA RCB STORM SEWER WITH CONCRETE COLLAR. COMPI. ETE IN PLACE 12. CONNECT PROPOSED 8'X8' RCB STORM SEWER TO EXISTING 8'X8' RCA STORM SEWED. EA EXPOSE Ili' OF EXISTING BOX REINFORCEMENT AND TIE PROPOSED BOX TO EXISTING AND CONNECT WITH CONCRETE COLLAR. COMPLETE IN PLACE 13. EXCAVATION, HAULING. AND COMPACTION OF FILL FROM LOWER KIRBY DETENTION POND TO EXISTING CONVEYANCE DITCH CHANNEL. ON ROAD TRUCKS REQUIRED. AS INDICATED ON PLANS. COMP( F TT, IN PIACF 14. INSTALLATION OF CONCRETE HEADWALL WITH PARALLEL WINGS FOR BOX CULVERTS. PER TXDOT DETAIL (SEE CONSTRUCTION PLAN SHEET 1'I), COMPLETE IN PLACE 15. REMOVAL AND DISPOSAL OF EXISTING CONCRETE HEADWALL WITH PARALLEL WINGS, COMPLETE IN PLACE 15. REMOVAL AND DISPOSAL OF EXISTING BACKSLOPE INTERCEPTOR STRUCTURE, INCLUDING 24' COMP STORM SEWER, 5' ARTICULATED BLOCK, AND CONCRETE PAD, COMPLETE IN PLACE CONSTRUCTION OF THE SOUTH SPECTRUM PHASE ONE. BOX GUI VI Rl S LOWER KIRBY PE ARLAND MANAGEMENT DISTRICT CITY LX' PEARLAND HARRIS COUNTY. TEXAS AUGUST 7.2015 LJA ENGINEERING, INC. S. ROSS AUGUST 10, 2015 2209.1502 19.21 7) C.E. BARKER, LTD. 8) MENADE, INC UNIT OTY UNIT COST TOT AI COSI UNIT COST TOTAL COST $12,500.00 512,500.00 1315 510.20 $13,413.00 S17.50000 517.500.00 48 $93 51 $4,488.48 10 $14766 5147660 2,076 $643.04 51.334.951.04 2,134 $0.12 5256.011 4 $367.20 S1,468.80 2 S4.304.40 58.608.80 4 6 CY 30.000 LS LS EA 3 17. DEMUCK AND FILL EXISTING BACKSLOPE SWALES, COMPLETE IN PLACE t F 18. 5' ARTICULATED BLOCK EROSION CONTROL AT OUT FALL OF B'XE MB STORM SEWER, SY COMPLETE IN PLACE SUBTOTAL DRAINAGE FACILITIES ITEMS MISCELLANEOUS ITEMS 1, STORM WATER POLLUTION PREVENTION PLAN COMPLIANCE INCLUDING MAINTAINING EXISTING FILTER FABRIC FENCE AND STABILIZED CONSTRUCTION EXIT, COMPLETE IN PLACE 2. STABILIZED CONSTRUCTION EXIT AT LOCATION SHOWN ON PLANS, TO INCLUDE INSTALLATION AND REMOVAL, (TO BF USFD ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER'. COMPLETE IN PLACE 3. FILTER FABRIC FENCE ALONG BOUNDARY BEFORE CONSTRUCTION STARTS, AS DIRECTED BY THE ENGINEER), COMPLETE IN PLACE • MATHEMATICAL ERROR LS EA LF 9) CROSTEX CONSTRUCTION, INC. UNIT COST TOTAL COST 55.000.00 55,000.00 57,500.00 S40.00 $52,600.00 $12.00 $100,000 00 5100,000.00 57.500.00 $100.00 $4,800.00 $66.00 S150 00 $1,500.00 $100 00 $71000 $1,473.960.00 S950.00 SI OU 52.134.00 $1.25 $500.00 $2,000.00 $250.00 $2,500.00 $5.000.00 $2,500.00 $2.937.60 511,75040 $1,000.00 $4,000.00 $1,500.00 $3,304.80 519,828 80 $1,000.00 $6,000.00 51,75000 54.590,00 $9,180.00 $5,000.00 $10.000.00 S5,000.00 59 04 $271,200.00 $900 5270,000.00 $10.50 S122,846.76 $122,846.76 $80,000.00 580,000.00 $80,000.00 544,88000 S44.88000 $10,000.00 S10,000.00 $25,000.00 51.346 40 54.039 20 S1.00000 $3,000.00 S7,500.00 1,037 $10.20 518./37.41) S10.00 $18,370.00 $12.00 40 $120.57 $4,822.80 S100.00 $4,000.00 5150.00 $1,901,948.18 52,052,364.00 $612.00 $612.00 $570.00 $500.00 51.5(10.00 2 51,830.00 53,67200 $1,000.00 52.000.00 51.500.00 2.740 S1.71 $4.685.40 52.00 55,480.00 S1.50 S7,500.00 515.780.00 $7,500.00 $3,168.00 $1,000.00 51.912200.00 52,667.50 $1,000.00 55,000.00 $6,000.00 510,500.00 $10,000 00 $315,000.00 $80,000.00 $25.000.00 S22.500.00 $22,044.00 $6,000.00 $2,512,859.50 • S1.500 00 $3,000.00 $4,110.00 SRN F-1386 US Swoonu,c Page 6 O1 7 O wgmo>,rmo.lso:oror+s ww w.v, MO So.sS.A.vn I e1. 8 c,+nro.* d� BID TABULATION FOR: BID OPENING DATE: BID OPENING LOCATION: TABULATION BY: TABULATION DATE. LJA JOB NO. ITEM DESCRIPTION 4. BROADCAST SEEDING. FERTILIZING. AND WATERING OF EXCAVATION AND FILL AREAS. ITO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER). COMPLETE IN PLACE 5. TURF ESTABLISHMENT OF DISTURBED SIDE SLOPES ON EXISTING DITCH ON COMPLETION OF CONST RUC I ION. COMPLL IL IN PLACE. 6. STAGE II - INLET PROTECTION BARRIER (4 SAND BAGS PER INLET) FOR EXISTING INLETS. COMPLETE IN PLACE 7. CONCRETE TRUCK WASHOUT PIT, INCLUDES MAINTENANCE AND REMOVAL. COMPLETE IN PLACE 8. ADDITIONAL COST FOR STORM SEWER BEDDING 8 BACKFILL FOR UNSATISFACTORY SOIL CONDITIONS, ALL SIZES AND DEPTHS (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMP) FTF IN P1 ACE 9. DE WATERING. ALL SIZES R DEPTHS, (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER). COMPLETE IN PL ACF 10. EXTRA CEMENT STABILIZED SAND. (TO BE USED ONL VAT THE WRITTEN DIRECTION OF THE ENGINEER). COMPLETE IN PLACE II . TEMPORARY I HAF FIG CONTROL FOR ON. ROAD TRUCK HAULING OF FILL MATERIAL. FOR BOX CULVERT CONNECTION. AND FOR HEADWALL REMOVAL, COMPLETE IN PLACE 12. CLEARING OF EXCAVATION AREA, TO INCLUDE CHIPPING AND FIAIJI ING OF Al. I. MATERIAL. COMPLETE IN PLACE SUBTOTAL MISCELLANEOUS ITEMS BID SUMMARY SUBTOTAL UHAINAGE FACILITIES ITEMS SUBTOTAL MISCELLANEOUS ITEMS TOTAL AMOUNT BID CONSTRUCTION OF THE SOUTH SPECTRUM PHASE ONE BOX CULVERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CITY OF PEARLAND HARRIS COUNTY, TEXAS AUGUST 1. 2015 LJA ENGINEERING. INC. S. ROSS AUGUST 10.2015 2209 1502 492) 4) B 5 CONSTRUCTION COMPANY. INC. UNI" OTY UNIT COST TOTAL. COST AC 2.5 $1,000.00 52,500.00 I S $3,000 (10 53,000.(X1 EA 2 550.00 S100.00 LS 5700.00 5700.00 LF 500 515.00 57,500.00 LE 500 $2500 512.500 00 CY 2.00 535.00 57,000.00 IS $1,700.00 $1,700.00 AC 2.5 51,500.00 $3,750.00 $49,980.00 • MATHEMATICAL ERROR Page 5 0l 7 51,695,353.00 $49,960 (XI 51,745,313.00 5) MONARCH CIVIL CONSTRUCTORS. LLC UNIT COSI TOTAL COST $600.00 51,50000 51,400.00 561 00 $500.00 $1500 525 00 $20 00 58.865 00 53.500.00 S1.400.1.10 5127 00 5500.00 $7,500.00 S12.500.00 54,000 00 S8,865.00 S8./50.00 $51,877.00 51,696,381.60 S51,877.00 $1,748,238.00 6) R CONSTRUCTION COMPANY UNI1 COST S800.00 $5,000.00 5177.00 51,285.00 $15.00 525 00 520.00 55,000.00 $4,000.00 TOTAL COST 52.000.00 $5,000.00 $354.00 S1.285.00 57,500.00 $12,500.00 54.000 00 $5,000.00 S10.000.00 565,859.00 51,748,218 40 56.5.859 00 $1,814,077.40 Ff. F.1]5E L IA Eprwwl Inc J LAND nOS 220? 15024K'15 .aw, N+CYMD jp,F'. twin" TT I ecx C,Mb DT W BID TABULATION FOR: BID OPENING DATE: BID OPENING LOCATION: TABULATION BY. TABULATION DATE LJA JOB NO. TEM DESCRIPTION DRAINAGE FACILITIES ITEMS 1. MOBILIZATION FOR EXISTING DITCH DEMUCKING AND CLEAN OUT. COMM E TE IN PLACE 2. DEMUCK EXISTING CONVEYANCE DITCH AND REESTABLISH DITCH AT A 0.05% SLOPE WITH 6' BOTTOM WIDTH AND 4:1 SIDE SLOPES FROM ENDING FLOWLINE OF EXISTING BOX CULVERTS TO EXISTING TXDOT DITCH, COMPLETE IN PLACE 3. MOBILIZATION FOR CONSTRUCTION OF STORM BOX CULVERTS, COMPLETE IN PLACE 4. 24' RCP STORM SEWER, ALL CUTS. TO INCLUDE BEDDING 8 BACKFILL, COMPLETE IN PLACE 5. 30' RCP STORM SEWER EQUALIZER PIPE, ALL CUTS, TO INCLUDE BEDDING 8 BACKFILL, COMPLETE IN PLACE 6. 6'X6' RCB STORM SEWER, TO INCLUDE BEDDING AND BACKFILL, COMPLETE IN PLACE 7. TRENCH SAFETY SYSTEM. ALL DEPTHS, COMPLETE IN PLACE 8, 8' BRICK PLUG FOR 24" STORM SEWER, COMPLETE IN PLACE 9. TYPE "C" MANHOLE TOPS FOR 42' STORM SEWER 8 SMALLER, ALL DEPTHS, TO BE CONSTRUCTED ON TOP OF 8'X8' RCB STORM SEWER. TIE INTO RCB STEEL, COMPLETE IN PLACE 10. CONNECT PROPOSED 24' STORM SEWER TO SIDE OF PROPOSED 8'X8' RCB STORM SEWER WITH CONCRETE COLLAR, COMPLETE IN PLACE I1 CONNECT PROPOSED 30' STORM SEWER EQUALIZER PIPE TO SIDE OF PROPOSED B'X8' RCB STORM SEWER WITH CONCRETE COLLAR. COMPLETE IN PLACE 12. CONNECT PROPOSED 8'X8' RCB STORM SEWER TO EXISTING 8'X8' RCB STORM SEWER. EXPOSE 1B' OF EXISTING BOX REINFORCEMENT AND TIE PROPOSED BOX TO EXISTING AND CONNECT WITH CONCRETE COLLAR, COMPLETE IN PLACE 13. EXCAVATION, HAULING. AND COMPACTION OF FILL FROM LOWER KIRBY DETENTION POND TO EXISTING CONVEYANCE DITCH CHANNEL, ON ROAD TRUCKS REQUIRED, AS INDICATED ON PLANS, COMPLETE IN PLACE 14. INSTALLATION OF CONCRETE HEADWALL WITH PARALLEL WINGS FOR BOX CULVERTS. PER TXDOT DETAIL (SEE CONSTRUCTION PLAN SHEET 17). COMPLETE IN PLACE IS REMOVAL AND DISPOSAL OF EXISTING CONCRETE HEADWALL WITH PARALLEL WINGS. COMPLETE IN PLACE IS. REMOVAL AND DISPOSAL OF EXISTING BACKSLOPE INTERCEPTOR STRUCTURE, INCLUDING 24' COMP STORM SEWER, 5' ARTICULATED BLOCK, AND CONCRETE PAO, COMPLETE IN PLACE 17. DEMUCK AND FILL EXISTING BACKSLOPE SWALES. COMPLETE IN PLACE 18. 5" ARTICULATED BLOCK EROSION CONTROL AT OUTFALL OF 8TX8' RCB STORM SEWER, COMM F.TE IN PLACE SUBTOTAL DRAINAGE FACILITIES ITEMS MISCELLANEOUS ITEMS 1. STORM WATER POLLUTION PREVENTION PLAN COMPLIANCE INCLUDING MAINTAINING EXISTING FILTER FABRIC FENCE AND STABILIZED CONSTRUCTION EXIT, COMPLETE IN PLACE 2. STABILIZED CONSTRUCTION EXIT AT LOCATION SHOWN ON PLANS, TO INCLUDE INSTALLATION AND REMOVAL. (TO BF USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE 3 FILTER FABRIC FENCE ALONG BOUNDARY BEFORE CONSTRUCTION STARTS, LAS DIRECTED BY THE ENGINEER), COMPLETE IN PLACE CONSTRUCTION OF THE SOUTH SPECTRUM PHASE ONE BOX CULVERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CITY OF PEARLAND HARRIS COUNTY. TEXAS AUGUST 7, 2015 LJA ENGINEERING, INC. S. ROSS AUGUST 10, 2015 2209 1502 19.21 418 5 CONSTRUCTION COMPANY, INC. UNIT OIY UNIT COST TOTAL COST LS 1 $2.50000 IF 1315 512.00 LS I 55,000.00 LF 48 S110.00 I 10 $160.00 I F 2,076 S550.00 I F 2,134 S1.00 EA 4 5400.00 EA 2 51,900.00 EA 4 $1,800.00 EA 6 51,800.00 EA 2 $10,000.00 CY 30,000 $2,500.00 515,780.00 $5,000.00 $5,280.00 S1.600.00 $1,141.800.00 $2,134.00 $1,600.00 $3,800.00 57,200.0(1 010.800 0(1 $20.00.0 513 00 S390 000.00 LS $57,00.00 I S $8,50.0 EA 3 $1.500.0 IF 1,837 $7.00 SY 40 S12500 LS S2,500.00 FA 52 30.00 LF 2.740 51.50 • MATHEMATICAL ERROR Page 4 cl 7 $57,000.00 $8,50.00 $4,50.0 512,859.0 S5.000 00 51,695,353.00 $2,50 00 54.60().0 $4.119.0) 5) MONARCH CIVIL CONSTRUCTORS, LLC UNIT COST TOTAL COST 56.000.00 S8,000.00 $1100 $14,485.00 Sb.000.03 56.000.00 3104 00 $4,992.00 St 30 Chi 51,390.00 S632 UU 51,312,032.00 SO 40 5853.60 S35000 51,100.00 52,144 00 54,208.00 5400.00 55001X7 54.281 00 51,600.00 S3.000.00 $8,562.00 $7.50 5225.000.00 $80,037.00 59,500.0 $70.0 $80,037 00 $9,500.00 S2.100.0 $6.00 S11,022.00 $103.0 S1,50.00 57.2500 SI.00 54,120.0 51,698,381.80 51,50.00 52,50.0 $2.740.00 BI H CONSTRUCTION COMPANY UNIT COST TOTAL COST 580,000.(X1 S80,000.00 540.00 552.600 00 525,000.00 525,000.00 5100.00 54.800 00 $200.00 52000.00 5620.00 51,287,120.00 S0.10 S213 40 5500 00 S2.00.00 54.000 00 $8.000.00 5500.00 $800.00 34,000.00 $6.00 570.000 00 S3.500.00 51.00.00 55.00 5150.0 54,000.00 53,00.0 53.0 $2.000.00 $4,800 00 56.000 00 5180,000.00 $70,00.00 $3,500.00 $3,00.00 $9,185.0 56.00.00 S1,748,218.40 54,000.0 56,000.00 58,220.00 FAN F 1886 UP. En07rPin0 ', 04ANt13MPZ00 5714107,3 Low gNLIU SSA S/KIVT VNt Ban CuMm BT es BID TABULATION FOR: BID OPENING DATE: BID OPENING LOCATION: TABULATION BY: TABULATION DATE: LJA JOB NO. ITEM DESCRIPTION 4. BROADCAST SEEDING, FERTILIZING. AND WATERING OF EXCAVATION AND FILL. AREAS. ITO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER). COMPLETE IN PLACE 5. TURF ESTABLISHMENT OF DISTURBED SIDE SLOPES ON EXISTING DITCH ON COMPLETION OF CONSTRUCTION. COMPLETE IN PLACE 6. STAGE II - INLET PROTECTION BARRIER (4 SAND BAGS PER INLET) FOR EXISTING INI. FTS, COMPLETE IN PLACE 7. CONCRETE TRUCK WASHOUT PIT. INCLUDES MAINTENANCE AND REMOVAL, COMPLETE IN PLACE 8. ADDITIONAL COST FUN STORM SEWER BEDDING & BACKFILL FOR UNSATISFACTORY SOIL CONDITIONS, ALL SIZES AND DEPTHS (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER). COMPLETE IN PLACE 9. DEWATERING. ALL SIZES S DEPTHS, (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE. ENGINEER). COMPLETE IN PLACE 10. EXTRA CEMENT STABILIZED SAND. (TO BE USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE I I TEMPORARY TRAFFIC CONTROL FOR ON ROAD TRUCK HAULING OF FILL MATERIAL, FOR BOX CULVERT CONNECTION. AND FOR HEADWALL REMOVAL, COMPLETE IN PLACE 12. Cl FARING OF EXCAVATION AITFA. TO INCLUDE CHIPPING AND HAULING OF ALL MATERIAL. COMPLETE IN PLACE SUBTOTAL MISCELLANEOUS ITEMS BID SUMMARY SUBTOTA!. DRAINAGE FACILITIES ITEMS SUBTOTAL MISCELLANEOUS ITEMS TOTAL AMOUNT BID CONSTRUCTION OF THE SOUTH SPECTRUM PHASE ONE BOX CUL VERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CI I Y Of F'CAHLAND HARRIS COUNTY, TEXAS AUGUST 7. 20th IJA ENGINEERING. INC. S ROSS AUGUST 111.2015 2 209-1 502 19.21 1I MEINERS CONSTRUCTION, INC. 21 TRIPLE B SERVICES, L.L P 11NI1 OTY LINT COST TOTAL COST UNIT COST TOTAL COST AC 2.5 $900.00 $2.250.00 5600.00 $1.500.00 L S 56 500.0() 56,500.00 S3.500.00 53.500.011 FA 2 525.00 55000 $65.00 5130.00 1S 5750.00 $750.00 5850.00 $850.00 LF 500 $15.00 57.500.00 515.00 57.500.00 LF 500 525.00 $12,500.00 52500 512.500.00 C V 200 $20.00 $4,000.00 S20 00 $4.000.00 LS $1,000.00 51.000.00 $15.000.00 515,000.00 AC 25 54.300.00 S10,150.00 55.500.00 513.750.00 554,325.00 $70,518.00 ' MATHEMATICAL ERROR Page 3 0l 7 51,511.175 00 554.325 00 51,565,500.00 S1.526.346.35 570,518.00 $1,598.864.35 31 SLACK & CO COMPANY. INC. UNIT COST 51.824 00 TOTAL COST S4.560.00 $5.000.00 55.000.00 $150.00 5300.00 5760.00 $760.00 S38.00 519.000.00 525.00 512.500.00 538.00 $7,600.00 S2,000.00 52.000.00 57.028 00 $17,570.00 $77,311.00 S1.554.260 84 , S77.311.00 $1,631,671.84 ' PAN P•1391 LJA EVAN. ng �LANOS201S.'VVV5M0607 'S. LM PAN MD S vh Swcwn PP I Doc Gummy er i. BID TABULATION FOR- BID OPENING DATE: BID OPENING LOCATION: TABULATION BY: TABULATION DATE: LJA JOB NO. ITEM DESCRIPTION DRAINAGE FACILITIES ITEMS I MOBIL IZATION FOR F XISTING DITCH DEMUCKING AND CLEAN OUT, COMPLETE IN PLACE' 'l. DEMUCK EXISTING CONVEYANCE DITCH AND RE-ESTABLISH DITCH AT A 0.05% SLOPE WITH 6' BOTTOM WIDTH AND 4:1 SIDE SLOPES FROM ENDING FLOWLINE OF EXISTING BOX CUE VFRTS TO EXISTING TXDOT DITCH. COMPLETE IN PI ACE 3. MOBILIZATION FOR CONSTRUCTION OF STORM BOX CUtVERTS, COMPLETE IN PLACE 4 24' RCP STORM SEWER. ALL CUTS, TO INCLUDE BEDDING 8 BACKFILL . COMPLETE IN PLACE 5. 30' RCP STORM SEWER EQUALIZER PIPE, ALL CUTS, TO INCLUDE BEDDING 8 BACKFILL. COMPI ETE IN PLACE 6. 8'X8' RCB STORM SEWER. TO INCLUDE BEDDING AND BACKFILL, COMPLETE IN PLACE 7. TRENCH SAFETY SYSTEM. ALL DEPTHS. COMPLETE IN PLACE B 8' BRICK P1 UG FOR 24' STORM SEWER, COMPLETE IN PLACE 9. TYPE ti' MANHOLE TOPS FOR 42' STORM SEWER 8 SMALLER, ALL DEPTHS, TO BE CONSTRUCTED ON TOP OF 8'X8' RCB STORM SEWER. TIE INTO RCB STEEL, COMPLETE IN PEACE 10 CONNECT PROPOSED 24' STORM SEWER TO SIDE OF PROPOSED 8'X8' ROB STORM SEWER WITH CONCRETE COLLAR, COMPLETE IN P1. ACE II. CONNECT PROPOSED 30' STORM SEWER EQUALIZER PIPE TO SIDE OF PROPOSED 8 X8' RCB STORM SEWER WITH CONCRETE COLLAR. COMPLETE IN PLACE 12. CONNECT PROPOSED 8'X8' HCB STORM SEWER 10 EXISTING 8'X8' HCB ST OHM SEWER. EXPOSE 18' OF EXISTING BOX REINFORCEMENT AND TIE PROPOSED BOX TO EXISTING AND CONNECT WITH CONCRETE COI I AR, COMPI FTF IN PLACE t3. EXCAVATION, HAULING, AND COMPACTION OF FILL FROM LOWER KIRBY DETENTION POND TO EXISTING CONVEYANCE DITCII CHANNEL.. ON ROAD TRUCKS REQUIRED AS INDICATED ON PLANS. COMPLETE IN PLACE 14 INSTALLATION OF CONCRETE HEADWALL WITH PARALLEL WINGS F Of 1 BOX CULV E HTS. PER TXDOT DETAIL (SEE CONSTRUCTION PLAN SHEET t 7), COMPLETE IN PLACE 15. REMOVAL AND DISPOSAL OF EXISTING CONCRETE HEADWALL WITH PARALLEL WINGS. COMPLETE IN PLACE 16 REMOVAL AND DISPOSAL OF EXISTING RACKSLOPE INTERCEPTOR STRUCTURE. INCLUDING 24' COMP STORM SEWER, 5' ARTICULATED BLOCK. AND CONCRETE PAD, COMPLETE IN PLACE 17. DEMUCK AND FILL EXISTING BACKSLOPE SWALE S. COMPLETE IN PLACE 18. 5' ARTICULATED BLOCK EROSION CONTROL AT OUTFALL OF 858' RCB STORM SEWER. COMPLETE IN PLACE SUBTOTAL DRAINAGE FACILITIES ITEMS MISCELLANEOUS ITEMS I. STORM WATER POLLUTION PREVENTION PLAN COMPLIANCE INCLUDING MAINTAINING EXISTING FILTER FABRIC FENCE AND STABILIZED CONSTRUCTION EXIT, COMPLETE IN PLACE 2 STABILIZED CONSTRUCTION EXIT AT LOCATION SHOWN ON PLANS. TO INCLUDE INSTALLATION ANU REMOVAL, (TO BE USED ONLY Al THE WRIT TEN DIRECTION OF THE ENGINEER), COMPLETE IN PLACE 3. FILTER FABRIC FENCE ALONG BOUNDARY BEFORE CONSTRUCTION STARTS. (AS DIRECTED BY THE ENGINEER), COMPLETE IN PLACE CONSTRUCTION OF THE SOUTH SPECTRUM PHASE ONE BOX CULVERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CITY OF PFARLAND HARRIS COUNTY, TEXAS AUGUST 7, 2015 LJA ENGINEERING, INC S. ROSS AUGUST 10, 2015 22091502 19 21 II MEINERS CONSTRUCTION, INC. UNIT OTY UNIT COST TOTAL COST L S 1 $15,00.00 LF '315 58.00 1 S I 533.434 0 LE 40 575 0 LF t0 565 0 a 2,076 $600.0 LF 2.134 $1.00 FA 4 5300 EA 2 S1,200 EA 4 530.0 EA EA CY 30.000 lS LS EA 3 LF SY 40 LS EA 2 LF 2.740 1.8337 6 530 0 2 58.50.0 $2.75 $70,00.0 515,00 00 S700 00 51.0 5130.0 $1,600.0 $2,00.0 $1.25 MATHEMATICAL ERROR Page 2 01 7 515,000 00 $10,520.0 S33.434 00 $3,00 0 $650.00 $1.245,60.0 $2,134.0 $1,20.0 S2.40.00 $1,20.0 $1,800.00 S17.000.00 $82,50.0 570,000.0 515.000.00 $2,100.00 S1.837.00 $5,20.0 $1,511.175.0 $1,600.00 $4,00 0 S3.425.0 21 TRIPLE B SERVICES. L. L.P UNIT COST TOTAI COST $10,000.00 $13.75 $15,000.00 S125.0 $90.0 $550.00 50.15 5625.0 $3,950.0 $1,90.0 $1.855.0 54,350.0 56.85 S75,00.0 52,050.0 5560.0 55.0 $75.0 51,50.0 $3.50.0 SI 20 $10.0X0.00 $18,081.25 S15,00000 $6,00.0 5900.00 $1.141,80.0 $320 10 $2.50.0 $7,900.00 57,600 00 $11,130 00 $8.700 $205,500.00 $75,000 00 52,050.0 51,680 0 S9,185.0 53.00.0 $1,526,346.35 51,500 00 57,00.0 $3,288 00 31 SLACK 8 CO. COMPANY, INC. UNIT COST TOTAL COST 510.390.00 510,390.00 $15.00 $19,725.00 S10.390.0 510.390.00 5262.08 $483.0 S548 00 50.50 51,067.0 $10.0 $40.0 $3.413.00 $6,826.00 $125.00 $50.0 $250.00 $1,500.00 $5,380.00 510,760 0 $9.20 5276,00.0 $21,190.0 821,10.0 $21,950.00 $21,950.00 $1,520.0 54,560.0 $5.0 $9,185.0 $128.00 55.120.0 $1,165.0 52.058.0 51.0 512,57284 • 54,830.00 $1,137,648.0 $1,554,280.84 ' $1,165.00 $4,116.00 $2.740.0 FAN F 13x6 U� C.asF.O IK A _A1C.720III,T) IY2CM115 tn.. .4 00 &Olt Soave,. %.1 era avast. BT [t BID TABULATION FOR: BID OPENING DATE: BID OPENING LOCATION: TABULATION BY: TABULATION DATE LJA JOB NO. BIDDER'S NAME 11 MEINERS CONSTRUCTION, INC. 21 TRIPLE B SERVICES, L.L.P 31 SLACK & CO. COMPANY. INC. 4) B 5 CONSTRUCTION COMPANY. INC. 51 MONARCH CIVIL CONSTRUCTORS, LLC 6) R CONSTRUCTION COMPANY 7) C.E. BARKER, LTD, 81 MENADE, INC. 91 CROSTEX CONSTRUCTION, INC. :JAL ENDAR DAYS 55715 CONSTRUCTION OF Till SOUTH SPECTRUM PHASE ONE BOX CULVERTS LOWER KIRBY PEARLAND MANAGEMENT DISTRICT CITY OF PEARLAND HARRIS COUNTY. TEXAS AUGUST 7, 2015 WA ENGINEERING. INC. S. ROSS AUGUST 10, 2015 2209.1502 19.21 I. James D. 'PThose 51 s6utatwn.r.. narcuy 1nnAy s to Ue uue entl curruct • MATHEMATICAL ERROR TOTAL BID AMOUNT $1,565,500.00 $1.596,064.35 S1.631.571.64 $1,745,313.00 $1.748,238.60 S1,8t4,077.40 51,994,731.38 $2,114,644.00 52.521.494.50 t*• S*• : i JAMES D. ROSS tkl) 89452, 14r, I t. • l............ NG_ /o -/r (E OF .........l 14 • • *�r • * ,I, cage 1 Cl 1 FN F t 765 UA EpnMfq 'C 0 LAh0:.200=9 IG02a'WITS Lrar RYBy NU StVP Spcl+'n PA. Bo.C'Jwit BY rt EXHIBIT B ITEMS ELIGIBLE REIMBURSTMENT: DRAINAGE 6 Detention: Tool - Flo Amerl ux Kirby Ditch - Lateral #1 TxDOT Ditch Phase I Detention Constuction Road Projects: Hooper Road N. Spectrum Blvd (Developer) Futre N. Spectrum Blvd Future S. Spectrum Blvd. Future Promenade Shops Dr. Detention Pond EXHIBIT A AERIAL - IMPROVEMENTS RESPONSIVE RESULTS -ORIENTED TRUST -BUILDERS ACCOUNTABLE City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Tel: 281.652.1600 www.pearlandtx.gov 1 hereby acknowledge receipt of Chapter 5, Section 5.12, Breastmilk Expression. The listed policy supersedes any previous version of the policies. I understand that continuing employment with the City of Pearland constitutes acceptance of these and all other City Policies. NAME PRINTED - LEGIBLE SIGNATURE DATE LJA Engineering, Inc. 2929 Bnarpark Dnve Suite 600 Houston Texas 77042 TBPE Nc F•1386 Phone 713 953 5200 Fax 713 953 5026 www Ilaengmeenng corn TBPLS Nc 10110501 IA July 14, 2015 PROPOSAL Mr. Ron Dagley - President Lower Kirby Pearland Management District c/o Allen Boone Humphries Robinson LLP Phoenix Tower 3200 Southwest Freeway, Suite 2600 Houston, Texas 77027 Re: South Spectrum Phase I — Box Culverts City of Pearland, Texas LJA Proposal No. 15-00974 Dear Mr. Dagley: LJA Engineering, Inc. (LJA) is pleased to submit this proposal for the following services for the South Spectrum Phase 1 — Box Culverts in accordance with the terms and conditions set forth in the Engineering Services Agreement dated, February 6, 2014. SCOPE OF SERVICES Phase Description FEE Basic Services for Design and Construction Administration 402 Preliminary Design ($ 1,327,534 x 7.3% x 25%) 403 Final Design ($ 1,327,534 x 7.3% x 50%) 410 Approvals ($ 1,327,534 x 7.3% x 10%) 411 Bidding or Negotiation ($ 1,327,534 x 7.3% x 5%) 412 Construction Phase ($ 1,327,534 x 7.3% x 10%) Surveying 205 Design Survey (2.0% of Const. Cost) 208 Control Staking (1.0% of Const. Cost) 409 Project Representative (3.5% of Const. Cost) Additional Services 413 Storm Water Pollution Prevention Plan 414 Geotechnical Study 415 Construction Testing Services 416 Environmental Services Z99 Reimbursable Expenses (Estimated) TOTAL $ 24,227 $ 48,454 $ 9,690 $ 4,845 $ 9,690 $ 26,551 $ 13,275 $ 46,464 $ 5,000 $ 10,000 $ 15,000 $ 1,100 $ 5,000 $ 219,296 This fee includes an estimated amount of $5,000.00 for the reimbursable expenses. This budget will be used for the actual expenses incurred on the project including bid advertisement, printing, mileage, etc. This proposal does not include Right-of-Way/Easement acquisition services or environmental services. O:\PROPOSAL\2015\Lower Kirby\PED\15-00974 South Spectrum Phase I doc Mr. Ron Dagley July 14, 2015 Page 2 of 2 We appreciate the opportunity to submit this proposal and look forward to working with you on this project. If you should have any questions or require additional information, please do not hesitate to contact me at 713.953.5096. Sincerely, 9 �- James D. Ross, PE Vice President JDR/ew O:\PROPOSAL\2015\Lower Kirby\PED\15-00974 South Spectrum Phase I.doc EXHIBIT B LJA Engineering, Inc. 2929 8narpa rk Dove Suite 600 Houston. Texas 77042 TBPE NQ F-1366 July 21, 2015 Phone 713 953 5200 Fax 713 953 5026 mvw 1laengineenng com TDPLS Ns 10110501 Mr. Skipper Jones Assistant Director of Capitol Projects City of Pearland 3523 Liberty Drive Pearland, Texas 77581 Re: Preliminary Engineering Report South Spectrum Boulevard From Kirby Drive to Existing South Spectrum Boulevard Water, Sanitary Sewer, and Drainage Facilities and Paving City of Pearland, Texas LJA Proposal No. 15-00936 Dear Mr. Jones: IA PROPOSAL LJA Engineering, Inc. (LJA) is pleased to submit this proposal for the following services for the Preliminary Engineering Report to Serve South Spectrum Boulevard in accordance with the terms and conditions set forth in the Contract for Professional Services. SCOPE OF SERVICES See Attached Exhibit A. COMPENSATION Phase Description 402 Preliminary Phase Services Surveying 202 Abstract of Parcels with Map/Metes and Bounds/Boundary Verification 205 Topographic Survey 414 Geotechnical Study Environmental Services 416 Wetland Delineation 419 Limited Phase 1 Site Assessment 420 USACE Nationwide Permit (If Required) 403 Drainage Study Report 404 Construction Drawings ($5,549,300 x 6.3%* x 30%) 405 Preliminary Construction Cost Estimate 406 Preliminary Engineering Report Z99 Reimbursable Expenses (Estimated and Not to Exceed) TOTAL 'TSPE curve of compensation FEE $ 5,000 $ 25,000 $ 24,000 $ 11,660 $ 4,950 $ 3,355 $ 15,290 $ 5,000 $ 104,882 $ 5,000 $ 5,000 $ 5,000 $ 214,137 This fee includes an estimated amount of $5,000.00 for the reimbursable expenses. This budget will be used for the actual expenses incurred on the project including printing, mileage, etc. This proposal does not include Platting, Landscaping, or Right-of-Way/Easement acquisition services. O:\PROPOSAL\2015\Lower Kirby \PED115-00936 S Spectrum Road Pay pro.doc Mr. Skipper Jones July 21, 2015 Page 2 of 2 We appreciate the opportunity to submit this proposal and look forward to working with you on this project. If you should have any questions or require additional information, please do not hesitate to contact me at 713.953.5096. Sincerely, ACCEPTED FOR: CITY OF PEARLAND James D. Ross, PE Vice President JDR/ew By: Name: Title: Date: O:\PROPOSAL\2015\Lower Kirby\PED\15-00936 S Spectrum Road Pay pro.doc EXHIBIT A TRANSPORTATION SCOPE OF SERVICES FOR South Spectrum Boulevard Preliminary Engineering Report Design 1 of 4 D6 Revised 1 12 BASIC SERVICES: The Consultant shall render the following professional engineering services to the OWNER in connection with the construction of the Project. 1. Preliminary Phase Services a. Attend regular meetings with City and external agencies including County, State & Federal entities, as required, to identify, solicit, and develop pertinent & critical information sources. b. Gather City's existing information. c. Provide or Procure additional information as required from i. Existing surveys, base plans, past and present studies ii. Geotechnical Consultants iii. Environmental Consultants iv. Record drawing and/or As-Builts information from previously constructed utilities 2. Prepare Preliminary Engineering Report (PER) a. Submit Draft report containing: I. Executive Summary & Design Recommendation ii. Review of Design Alternatives iii. Proposed Construction methodology and method iv. Alignment & Topographic Surveys in performed accordance with City Standards v. Draft Geotechnical report with bore location logs & pavement design recommendations vi. Draft environmental study consisting of: 1. Phase 1 site assessment a) Include recommendation for additional studies if required 2. Drainage Study Report Design 2 of 4 D6 Revised 1:12 a) Include analysis of pre -developed and developed conditions in conformance with City standards b) Include possible sub -drainage scenarios for area 3. Preliminary Jurisdictional Wetlands Determination and if required: a) a Delineation b) schedule USAGE verification c) Preliminary Mitigation plan d) Endangerod Species study -92— o) Cultural Resources study vii. Prepare 30% construction drawings incorporating 1. Metes & bounds and topographic surveys 2. Right of Way/Easement parcel map a) individual exhibits to be provided in Final Design phase viii Drainage Area maps with: 1. Developed area flow calculations 2. A preliminary Drainage Design in accordance with the City, BDD4, and/or HCFCD as applicable requirements ix. Preliminary Horizontal & Vertical Alignment in Plan & Profile format x. Preliminary parcel map, including: 1. Existing easements & right of way 2. Proposed easements & right of way 3. Parcel owner's information 4. Existing surface and below surface permanent improvements within 25' of existing and/or proposed ROW Design 3 of4 D6 Revised 1 12 xi. Develop a Utility Conflict List 1. Identify utility owners & notify utilities in writing xii. Prepare an Engineer's Preliminary Estimate of construction cost xiii. Provide written responses to City review comments 1. Prepare written responses to City's review comments 2. Make revisions to report & resubmit for Final approval when all comments are addressed xiv. Attend monthly progress/update meetings xv. Submit Final Report 4of4 D6. Revised 1/12