R-2015-070 2015-04-27 RESOLUTION NO. R2015-70 A Resolution of the City Council of the City of Pearland, Texas, awarding a bid for the construction of the Regency Park Paving and Drainage Project to SER Construction Partners, LLC, in the amount of $3,308,684.25; and authorizing appropriations from the CR 59 Project in the amount of $156,957.00 and from Fund 67 in the amount of $173,599.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That competitive bids for the construction of the Regency Park Paving and Drainage Project have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to SER Construction Partners, LLC., in the amount of $3,308,684.25. Section 3. The City Manager or his designee is hereby authorized to execute a contract for the construction of the Regency Park Paving and Drainage Project. PASSED, APPROVED and ADOPTED this the 27th day of April, A.D., 2015. TOM REID MAYOR ATTEST: 4 /: ./Awe /. ,/ =o Y� NGLt ,G, T' ►�C =" \ 1► SE( ETARY .... APPROVED AS TO FORM: (acx.A"--- DARRIN M. COKER CITY ATTORNEY Resolution No. R2015-70 SER Construction CITY OF PEARLAND Exhibit "A" Section 00300 BID PROPOSAL Part A Date: 4/14/2015 Bid of SER Construction Partners, LLC. , an individual proprietorship/a corporation organized and existing under the laws of the State of Texas/a partnership consisting of , for the construction of: Regency Park Subdivision Paving and Drainage Project City of Pearland,Texas COP PN: TR 1402 BID NO.: 0115-15 (Submitted in Electronic format) To: The Honorable Mayor and City Council of Pearland City of Pearland 3519 Liberty Drive Pearland,Texas 77581 Pursuant to the published Invitation to Bidders, and Instructions to Bidders, the undersigned Bidder hereby proposes to perform all the work and furnish all necessary superintendence, labor, machinery, equipment, tools and materials, and whatever else may be necessary to complete all the work described in or reasonably inferable from the Contract Documents for the construction of the Regency Park Subdivision Paving and Drainage Project with all related appurtenances, complete, tested, and operational, in accordance with the Plans and Specifications prepared by the Design Consultant, Jason Brock, P.E., Binkley & Barfield, Inc. 1710 Seamist Drive, Houston, Texas 77008, 713.869.3433, for the unit prices or applicable prices set forth in Exhibit "A", the electronic bid form as contained in the City's E-bid system, which, once fully executed and submitted shall constitute a legal and executable proposal from the Bidder. It is understood that, in the event any changes are ordered on any part of the Work, the applicable unit prices bid shall apply as additions to or deductions from the total prices for the parts of the Work so changed. The Bid Security required under the Instructions to Bidders is included and has been uploaded as an attachment within the E-bid system and, that a fully executed, signed and sealed hard copy has been delivered to the Office of City Purchasing, Finance Department, 2nd Floor, City Hall, 3519 Liberty Drive, Pearland, Texas 77581. The Bidder agrees to submit to the Owner the Qualifications of Bidder, including the Financial Statement of Bidder, as required by the Instructions to Bidders if requested to do so as a condition of the Bid review. The Bidder binds himself, upon acceptance of his proposal, to execute the Standard Form of Agreement and furnish an acceptable Performance and Payment Bond and Maintenance Bond, each in the amount of one hundred percent (100%) of the total Contract Price, according to the forms included in the Contract Documents, for performing and completing the said work within the time stated and for the prices stated in Part B of this proposal along with all required insurance in the required amounts. Bidder's Initial's: R.R. 10-2012 00300- 1 of 2 CITY OF PEARLAND BID PROPOSAL The undersigned Bidder agrees to commence work within 10 days of the date of a written Notice to Proceed. It is understood that the Work is to be Substantially Complete within three hundred and thirty days (330)] days after the date of the Notice to Proceed. Time for Substantial Completion shall begin on the date established by the Notice to Proceed. The Contractor will pay liquidated damages in the amount(s) specified in Document 00500 — Standard Form of Agreement, in the event the Work is not Substantially Complete within the Contract Time. The undersigned agrees that the amounts bid in this Bid Proposal will not be withdrawn or modified for ninety (90) days following date of Bid Proposal opening, or such longer period as may be agreed to in writing by the City of Pearland and Bidder. It is understood that in the event the Successful Bidder fails to enter into the Standard Form of Agreement and/or to furnish an acceptable Performance and Payment Bond and Maintenance Bond, each in the amount of one hundred (100) percent of the Contract Price, along with all required insurance in the stated amounts within ten (10) days of the Notice of Award, the Successful Bidder will forfeit the Bid Security as provided in the Instructions to Bidders. Unless otherwise expressly provided herein, all references to"day(s)" shall mean calendar day(s). The Bidder acknowledges that the following Addenda have been received. The modifications to the Bidding Documents noted therein have been considered and all costs thereto are included in the Bid Proposal prices. Addendum No.: One Date: 4/13/2015 Addendum No.: Date: Addendum No.: Date: Addendum No.: Date: Bidder hereby represents that the only person or parties interested in this offer as principals are those named. Bidder ha of directly or indirectly entered into any agreement, participated in any collusion, or otherwise to en any action in restraint of free competitive bidding. Firm N. : ER to ss' P: ner LLC. By: • Title: President Address: 3636 Pasadena Blvd., Pasadena,TX., 77503 Phone No: 713-473-7900 ATTEST: i Sandr. .Trevino (Seal,if Bidder is a Corporation) (T'' -� jyo1'Ia - Signat Date: 4/14/2015) END OF SECTION Bidder's Initial's: R.R. 10-2012 00300-2 of 2 Bid No. 0115-15 Regency Park Subdivision Paving & Drainage SER Construction Partners, LLC Line Description UOM QTY Unit Extended 1 General Work 1 $310,226.50 $310,226.50 1.1 Mobilization (3% Maximum) LS 1 $95,000.00 1.2 Furnish Performance and Payment Bonds and Insurance LS 1 $42,000.00 Tree Protection and Trimming Services including Fencing, Zero Curb Cut and Vapor Barriers, Complete-in-Place, In Accordance 1.3 with the Plans and Specifications LS 1 $37,500.00 Tree Removal (1"to 11.99" Diameter), Complete-in-Place, In 1.4 Accordance with the Plans and Specifications EA 1 $937.50 Tree Removal (12"to 29.99" Diameter), Complete-in-Place, In 1.5 Accordance with the Plans and Specifications EA 16 $1,500.00 Tree Removal (30"to 50" Diameter), Complete-in-Place, In 1.6 Accordance with the Plans and Specifications EA 2 $2,500.00 Furnish, Install and Maintain Traffic Control Devices and appurtenances, in accordance with the Texas Manual on Uniform Traffic Control Devices(Latest Edition), Complete-in-Place, In 1.7 Accordance with the Plans and Specifications LS 1 $40,000.00 Furnish Flaggers, in accordance with the Texas Manual on Uniform Traffic Control Devices(Latest Edition), Complete-in- 1.8 Place, In Accordance with the Plans and Specifications LS 1 $37,500.00 Videotaping of Construction, Complete-in-Place, In Accordance 1.9 with the Plans and Specifications LS 1 $3,750.00 Furnish and Install Metal Beam Guard Fence(Timber Post), Complete-in-Place, In Accordance with the Plans and 1.10 Specifications LF 90 $92.10 Furnish and Install Gate with Signs and Knox Box, Corn plete-in- 1.11 Place, In Accordance with the Plans and Specifications EA 2 $1,875.00 Remove and Reinstall Mailboxes, Traffic Signs, Street Signs, Fences, etc. as Necessary to Accomplish Work, Complete-in- 1.12 Place, In Accordance with the Plans and Specifications LS 1 $12,500.00 2 Paving 1 $1,817,374.00 $1,817,374.00 Remove and Dispose of Old Concrete Pavement including Curbs (All Depths), Complete-in-Place, In Accordance with the Plans and 2.1 Specifications SY 17700 $13.00 Remove and Dispose of Old Concrete Driveways and Sidewalks (All Depths), Complete-in-Place, In Accordance with the Plans and 2.2 Specifications SY 3300 $9.00 Adjust Existing Manhole to New Grade, Complete-in-Place, In 2.3 Accordance with the Plans and Specifications LS 1 $729.70 Adjust Existing Valve Box to Finished Grade, Complete-in-Place, 2.4 In Accordance with the Plans and Specifications LS 1 $371.90 Adjust Existing Pull Box to Finished Grade, Complete-in-Place, In 2.5 Accordance with the Plans and Specifications LS 1 $812.50 Roadway Excavation including Stripping and Off-site Disposal Outside of City Limits, Complete-in-Place, In Accordance with the 2.6 Plans and Specifications CY 1450 $21.00 Furnish Embankment, Complete-in-Place, In Accordance with the 2.7 Plans and Specifications CY 400 $5.10 Prepare and Compact 6" Lime Stabilized Subgrade, Complete-in- 2.8 Place, In Accordance with the Plans and Specifications SY 18818 $6.00 Furnish Lime(6% by Dry Weight), Complete-in-Place, In 2.9 Accordance with the Plans and Specifications TON 565 $187.50 Bid No. 0115-15 Regency Park Subdivision Paving & Drainage SER Construction Partners, LLC Line Description UOM QTY Unit Extended Furnish and Install 6" Reinforced Concrete Pavement, Complete- 2.10 in-Place, In Accordance with the Plans and Specifications SY 16000 $56.00 Furnish and Install 6" High Early Strength Reinforced Concrete Pavement, Complete-in-Place, In Accordance with the Plans and 2.11 Specifications SY 2600 $59.00 Furnish and Install 4" Reinforced Concrete Sidewalks, Complete- 2.12 in-Place, In Accordance with the Plans and Specifications SF 2500 $5.90 Furnish and Install Access Landing, Complete-in-Place, In 2.13 Accordance with the Plans and Specifications EA 1 $1,237.20 Furnish and Install 6" Reinforced Concrete Driveways, Complete- 2.14 in-Place, In Accordance with the Plans and Specifications SY 3250 $49.40 Furnish and Install Temporary Residential Driveway, In 2.15 Accordance with the Plans and Specifications EA 85 $315.60 Furnish and Install Temporary Commercial Driveway, In 2.16 Accordance with the Plans and Specifications EA 2 $378.10 Furnish and Install Temporary 6-inch Black Base as directed by 2.17 Engineer, In Accordance with the Plans and Specifications SY 225 $43.00 Furnish and Install 4-inch Wide Thermoplastic Pavement Marking, 2.18 In Accordance with the Plans and Specifications LF 675 $1.30 Blast Cleaning for 4-inch Wide Thermoplastic Pavement Marking, 2.19 In Accordance with the Plans and Specifications LF 675 $1.30 Furnish and Install 6-inch Reinforced Concrete Curb, Complete-in- 2.20 Place, In Accordance with the Plans and Specifications LF 11250 $3.50 3 Storm Sewer 1 $374,895.80 $374,895.80 Remove and Dispose of Existing 12" Pipe, Complete-in-Place, In 3.1 Accordance with the Plans and Specifications LF 60 $28.40 Remove and Dispose of Existing 15" Pipe, Complete-in-Place, In 3.2 Accordance with the Plans and Specifications LF 250 $32.90 Remove and Dispose of Existing 18" Pipe, Complete-in-Place, In 3.3 Accordance with the Plans and Specifications LF 205 $34.20 Remove and Dispose of Existing 24" Pipe, Complete-in-Place, In 3.4 Accordance with the Plans and Specifications LF 75 $38.00 Remove and Dispose of Existing 30" Pipe, Complete-in-Place, In 3.5 Accordance with the Plans and Specifications LF 60 $41.30 Remove and Dispose of Existing Inlet, Complete-in-Place, In 3.6 Accordance with the Plans and Specifications EA 15 $415.60 Remove and Dispose of Existing Manhole, Complete-in-Place, In 3.7 Accordance with the Plans and Specifications EA 5 $415.60 Furnish and Install 13.5"x 22" Reinforced Concrete Arch Pipe, All Depths, Complete-in-Place, In Accordance with the Plans and 3.8 Specifications LF 240 $140.50 Furnish and Install 18"x 28.5" Reinforced Concrete Arch Pipe, All Depths, Complete-in-Place, In Accordance with the Plans and 3.9 Specifications LF 360 $156.60 Furnish and Install 18" RCP(Class III C-76), All Depths, Complete- 3.10 in-Place, In Accordance with the Plans and Specifications LF 264 $112.10 Furnish and Install 24" RCP(Class III C-76), All Depths, Complete- 3.11 in-Place, In Accordance with the Plans and Specifications LF 972 $118.20_ Bid No. 0115-15 Regency Park Subdivision Paving & Drainage SER Construction Partners, LLC Line Description UOM QTY Unit Extended Furnish and Install 30" RCP(Class III C-76), All Depths, Complete- 3.12 in-Place, In Accordance with the Plans and Specifications LF 52 $144.40 Install 10' x 6' RCB, All Depths, Complete-in-Place, In Accordance with the Plans and Specifications(10' x 6' RCB to be Furnished By 3.13 Others) LF 60 $207.20 Furnish and Install Type 'A' Inlet, Complete-in-Place, In 3.14 Accordance with the Plans and Specifications EA 1 $1,884.40 Furnish and Install Type 'C' Inlet, Complete-in-Place, In 3.15 Accordance with the Plans and Specifications EA 25 $2,134.40 Furnish and Install Type 'B-B' Inlet, Complete-in-Place, In 3.16 Accordance with the Plans and Specifications EA 2 $2,134.40 Furnish and Install Storm Manhole, Complete-in-Place, In 3.17 Accordance with the Plans and Specifications EA 12 $2,179.70 Furnish and Install Metal Curb Opening for Yard Drain, Corn plete- 3.18 in-Place, In Accordance with the Plans and Specifications EA 8 $215.60 Furnish and Install 6-inch Concrete Slope Paving, Complete-in- 3.19 Place, In Accordance with the Plans and Specifications SY 30 $73.70 Trench safety System Construction of Storm Sewer, Complete-in- 3.20 Place, In Accordance with the Plans and Specifications LF 1888 $0.10 4 Stormwater Pollution Prevention Plan 1 $62,425.15 $62,425.15 Furnish and Install Block Sodding, Complete-in-Place, In 4.1 Accordance with the Plans and Specifications SY 12500 $4.20 Furnish and Install Hydromulch Seeding, Complete-in-Place, In 4.2 Accordance with the Plans and Specifications AC 0.5 $2,056.30 Furnish and Install Inlet Protection Barrier(Stage I), Corn plete-in- 4.3 Place, In Accordance with the Plans and Specifications EA 27 $43.10 Furnish and Install Inlet Protection Barrier(Stage II), Complete-in- 4.4 Place, In Accordance with the Plans and Specifications EA 26 $43.10 Furnish and Install Rock Filter Dam, Complete-in-Place, In 4.5 Accordance with the Plans and Specifications EA 3 $1,418.80 Furnish and Install Stabilized Construction Exit, Complete-in- 4.6 Place, In Accordance with the Plans and Specifications EA 1 $956.30 Furnish and Install Reinforced Filter Fabric Fence, Complete-in- 4.7 Place, In Accordance with the Plans and Specifications LF 250 $3.10 4.8 Portable Concrete Truck Washout Structures LS 1 $625.00 5 Water Items 1 $544,965.80 $544,965.80 Furnish and Install 6" Waterline, Trenchless Construction, including Fittings, Thrust Blocking, Restrained Joints, and Appurtenances, Complete-in-Place, In Accordance with the Plans 5.1 and Specifications LF 250 $45.60 Furnish and Install 8"Waterline, Trenchless Construction, including Fittings, Thrust Blocking, Restrained Joints, and Appurtenances, Complete-in-Place, In Accordance with the Plans 5.2 and Specifications LF 5400 $66.20 Furnish and Install 8" DIP Waterline, including Fittings, Thrust Blocking, Restrained Joints, and Appurtenances, Corn plete-in- 5.3 Place, In Accordance with the Plans and Specifications LF 60_ $99.20 Bid No. 0115-15 Regency Park Subdivision Paving & Drainage SER Construction Partners, LLC Line Description UOM QTY Unit Extended Trench Safety System Waterline Construction (All Depths), Complete-in-Place, In Accordance with the Plans and 5.4 Specifications LF 500 $0.10 Furnish and Install 8" Gate Valve with Box, Complete-in-Place, In 5.5 Accordance with the Plans and Specifications EA 16 $1,120.70 Furnish and Install Fire Hydrant Assembly, AWWA 502, Mechanical Joint Inlet, incl. Fire Hydrant, 6" Lead, 6" Gate Valve with Box and Barrel Extensions , ALL DEPTHS, Complete-in- 5.6 Place, In Accordance with the Plans and Specifications EA 6 $4,011.90 Remove and Salvage Existing Fire Hydrant, Complete-in-Place, In 5.7 Accordance with the Plans and Specifications EA 4 $235.90 Furnish and Install 8"Wet Connection, Complete-in-Place, In 5.8 Accordance with the Plans and Specifications EA 1 $1,105.50 Furnish and Install 6-inch Plug and Clamp, Complete-in-Place, In 5.9 Accordance with the Plans and Specifications EA 1 $186.10 Furnish and Install 8-inch Plug and Clamp, Complete-in-Place, In 5.10 Accordance with the Plans and Specifications EA 1 $247.70 Cut, Plug, and Abandon Existing 6"Water Main, Complete-in- 5.11 Place, In Accordance with the Plans and Specifications EA 1 $170.30 Relocate Existing Water Meter, Complete-in-Place, In Accordance 5.12 with the Plans and Specifications EA 1 $384.40 Adjust Existing Water Meter to Finished Grade, Complete-in- 5.13 Place, In Accordance with the Plans and Specifications EA 1 $418.80 Furnish and Install 1" Single Short Service Replacement Incl. Reconnect To Meter, Complete-in-Place, In Accordance with the 5.14 Plans and Specifications EA 55 $1,201.60 Furnish and Install 1"Single Long Service Replacement Incl. Reconnect To Meter, Complete-in-Place, In Accordance with the 5.15 Plans and Specifications EA 28, $2,090.60 6 Extra Items 1 $126,742.00 $126,742.00 Furnish and Install Well Pointing Systems as directed by Engineer, Complete-in-Place, In Accordance with the Plans and 6.1 Specifications LF 1000 $1.30 Furnish and Install 8-inch San. Swr., 150 psi, at Waterline Crossings as directed by Engineer, Complete-in-Place, In 6.2 Accordance with the Plans and Specifications LF 60 $67.20 Furnish and Install 22.5"x 36.25" Reinforced Concrete Arch Pipe, All Depths, Complete-in-Place, In Accordance with the Plans and 6.3 Specifications LF 60 $126.00 Furnish and Install Flow Stop Service for Temporarily Stopping Flow in Pipe, 6", Complete-in-Place, In Accordance with the Plans 6.4 and Specifications EA 2 $625.00 Furnish and Install Flow Stop Service for Temporarily Stopping Flow in Pipe, 8", Complete-in-Place, In Accordance with the Plans 6.5 and Specifications EA 2 $875.00 Furnish and Install 2" Single Long Side Water Service Connection, Complete-in-Place, In Accordance with the Plans and 6.6 Specifications EA 2 $1,750.00 Furnish and Install 2" Single Short Side Water Service Connection, Complete-in-Place, In Accordance with the Plans and 6.7 _Specifications EA 2_ $1,125.00 Bid No. 0115-15 Regency Park Subdivision Paving & Drainage SER Construction Partners, LLC Line Description UOM QTY Unit Extended Extra Select Backfill as Directed by the Engineer, Complete-in- Place, In Accordance with the Plans and Specifications ($15/CY 6.8 Minimum Bid) CY 250 $80.00 Extra Bank-Sand Backfill as Directed by the Engineer, Complete- in-Place, In Accordance with the Plans and Specifications($20/CY 6.9 Minimum Bid) CY 250 $20.00 Extra Wet-Sand Bedding as Directed by the Engineer, Complete- in-Place, In Accordance with the Plans and Specifications($20/CY 6.10 Minimum Bid) CY 250 $20.00 Extra Class "A"Cement Stabilized Sand Backfill as directed by Engineer, Complete-in-Place, In Accordance with the Plans and 6.11 Specifications (Min Bid. $50/TON) TON 400 $50.00 Extra Waterline Fittings, Complete-in-Place, In Accordance with 6.12 the Plans and Specifications($1500/TON Minimum Bid) TON 2 $1,500.00 Extra Class "A" Concrete, including forming, Complete-in-Place, In 6.13 Accordance with the Plans and Specifications(Min Bid. $325/CY) CY 100 $325.00 Extra Steel Reinforcing as Directed by the Engineer, Complete-in- Place, In Accordance with the Plans and Specifications ($0.50/LB 6.14 Minimum Bid) LB 4000 $0.50 Furnish and Install Temporary Pavement Markings, Class I, As 6.15 Directed by Engineer LF 1000 $1.30 Furnish and Install Temporary Pavement Markings, Class II, As 6.16 Directed by Engineer LF 1000 $1.30 6.17 Pot Hole for Utility Investigation -As Directed by Engineer EA 5 $1,250.00 Extra Machine Excavation as directed by the Engineer, Complete- in-Place, In Accordance with the Plans and Specifications($15/CY 6.18 Minimum Bid) CY 250 $15.00 Extra Hand Excavation as directed by the Engineer, Complete-in- Place, In Accordance with the Plans and Specifications ($20/CY 6.19 Minimum Bid) CY 250 $20.00 7 Alternate Work Items 1 $72,055.00 $72,055.00 Furnish and Install 8"Waterline with Steel Casing, Trenchless Construction, including Fittings, Restrained Joints, and Appurtenances, Complete-in-Place, In Accordance with the Plans 7.1 and Specifications LF 145 $465.00 Furnish and Install 16-inch by 8-inch Tapping Sleeve and Valve with Box, Complete-in-Place, In Accordance with the Plans and 7.2 Specifications EA 1 $4,630.00_ Total $3,308,684.25 Initials CITY OF PEARLAND STANDARD FORM OF AGREEMENT Section 00500 STANDARD FORM OF AGREEMENT THIS AGREEMENT is by and between City of Pearland (hereinafter called OWNER or City) and SER Construction Partners, LLC (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK CONTRACTOR shall complete all work as specified or indicated in or reasonably inferable from the Contract Documents (hereinafter the "Work"). The Work is generally described as follows: Regency Park Subdivision Paving and Drainage City of Pearland,Texas COP PN: TR1402 BID NO.: 115-15 The Disadvantaged Business Enterprise (DBE) goal for this project is 0%. The Small Business Enterprise (SBE) goal for this project is 0%. DBEs and SBEs selected must be TxDOT approved. Race neutral participation is encouraged and can be achieved through various supplier and subcontracting opportunities. Article 2. ENGINEER The Work has been designed by Binkley& Barfield, Inc., 1710 Seamist Drive, Houston, Texas 77008, 713.869.3433, Jason Brock, P.E who is hereinafter called ENGINEER and who is to assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. CONTRACT TIME 3.1 The Work will be Substantially Complete (as defined in Article 1 of the General Conditions) within Three Hundred Thirty (330) days (including weekends and holidays) from the date when the Contract Time commences to run as provided in paragraph 5.01 of the General Conditions (as revised in the Special Conditions if applicable), and completed and ready for Final Payment within Three Hundred Sixty (360) days from the date when the Contract Time commences to run. No work will be allowed on Sundays. 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 5 of the General Conditions. 2-2015 00500- 1 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT OWNER and CONTRACTOR also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration preceding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER Five Hundred dollars $500.00 for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time set out in the Certificate of Substantial Completion or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER Five Hundred dollars $500.00 for each day that expires after the time specified in the Certificate of Substantial Completion for completion and readiness for Final Payment. 3.3 Inspection Time. Working hours for the Pearland Inspection personnel are from 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding City approved holidays. The Contractor shall notify the OWNER of any required inspection overtime work at least 48 hours in advance and shall pay the overtime wages for the required City inspections. Article 4. CONTRACT PRICE 4.1 OWNER shall pay CONTRACTOR for completion of the Work in strict accordance with the Contract Documents in current funds $3,308,684.25 (the "Contract Price"). The Contract Price includes the Base Bid and Alternate #1 as accepted by OWNER as shown in Document 00300—Bid Proposal. Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Section 6.0 "Measurement and Payment" of the General Conditions. Application for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1 Progress Payments. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER as provided below. All progress payments will be on the basis of the progress of the Work and actual quantity of Work completed, in accordance with Article 6 "Measurement and Payment" of the General Conditions. 5.1.1 Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage or actual quantity of Work complete, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with the General Conditions. The OWNER shall make payment within 30 days of receipt of application for payment by the ENGINEER. 2-2015 00500-2 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT 5.1.2 Each progress payment shall be less retainage as specified in Paragraph 6.06 of the General Conditions, and further less all previous payments and all further sums that may be retained by the OWNER under the terms of this Agreement. It is understood, however, that in case the whole work be near to completion and some unexpected and unusual delay occurs due to no fault or neglect on the part of the CONTRACTOR, the OWNER may upon written recommendation of the ENGINEER pay a reasonable and equitable portion of the retained percentage to the CONTRACTOR, or the CONTRACTOR at the OWNER's option, may be relieved of the obligation to fully complete the Work and, thereupon, the CONTRACTOR shall receive payment of the balance due him under the contract subject only to the conditions stated under"Final Payment." 5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 6.09 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 6.09. Article 6. INTEREST Interest on any overdue payment from OWNER to CONTRACTOR shall be paid in accordance with the provisions of Chapter 2251.025 of the Texas Government Code, as amended. Article 7. CONTRACTOR'S REPRESENTATIONS In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations: 7.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. 7.2 CONTRACTOR has studied carefully all available surveys, assessments, reports of explorations, investigations, and tests of subsurface conditions and drawings of physical conditions of the site. Such technical reports and drawings are not Contract Documents, and Owner makes no representations or warranties as to the accuracy of such documents or information, or to whether or not they are complete, comprehensive, or all-inclusive. 7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraphs 7.2 above) which pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work, and CONTRACTOR assumes the risk of such subsurface and physical conditions, and shall furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and 2-2015 00500-3 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT conditions of the Contract Documents; and no additional examinations, investigations, explorations, tests, reports, and studies or similar information or data are or will be required by CONTRACTOR for such purposes. 7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract documents with respect to existing underground facilities at or contiguous to the site and assumes responsibility for the accurate location of said underground facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said underground facilities are or will be required by CONTRACTOR in order to perform and finish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents. 7.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, explorations, tests, reports, and studies with the terms and conditions of the Contract Documents. 7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies in the Contract Documents of which Contractor knew or should have known, and CONTRACTOR shall perform the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including any written resolution of any such conflict, error or discrepancy by ENGINEER. In the event of a conflict that was not brought to the OWNER's or ENGINEER's attention prior to the bid, the CONTRACTOR is assumed to have bid the most expensive alternative. Article 8. CONTRACT DOCUMENTS The Contract Documents, which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work, consist of the following, each of which are incorporated herein by reference: 8.1 Standard Form of Agreement(Section 00500). 8.2 Performance, Payment, and/or Maintenance Bonds (Sections 00610, 00611, and 00612). 8.3 General Conditions of Agreement (Section 00700), including Attachment No. 1 Workers' Compensation Insurance Coverage, Attachment No. 2 Agreement for Final Payment and Contractor's Sworn Release, and Attachment No. 3 Owner's Insurance Requirements of Contractor. 8.4 Special Conditions of Agreement(Section 00800). 8.5 Plans, consisting of sheets numbered 1 through 61 inclusive with attachments with each sheet bearing the following general title: Regency Park Subdivision Paving and Drainage Project. 2-2015 00500-4 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT 8.6 Instructions to Bidders and CONTRACTOR's Bid Proposal, including any Addenda referenced therein. 8.7 Technical Specifications for the Work. 8.8 The following, which may be delivered or issued after this Agreement becomes effective: Any Change Orders or other documents amending, modifying, or supplementing the Contract Documents in accordance with the General Conditions. There are no Contract Documents other than those listed above in this Article 8. The Contract Documents may only be amended, modified or supplemented as provided in the General Conditions. Article 9. MISCELLANEOUS 9.1 Terms used in this Agreement which are defined in Section 1, "Definitions and Interpretations" of the General Conditions will have the meanings indicated in the General Conditions. 9.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representative to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents. 9.4 CONTRACTOR agrees to warranty the Work for a period of one (1) year from Substantial Completion against defects in materials and workmanship. CONTRACTOR agrees to repair or replace any defective work within this warranty period immediately unless such repairs require long lead time materials and equipment in which case CONTRACTOR shall provide an agreeable schedule for repairs at no additional cost to OWNER. 9.5 The Work will be completed according to the Contract Documents and in accordance with codes, ordinances, and construction standards of the City of Pearland, and all applicable laws, codes and regulations of governmental authorities. 9.6 In the event any notice period required under the Contract Documents is found to be shorter than any minimum period prescribed by applicable law, the notice period required shall be construed to be the minimum period prescribed by applicable law. 2-2015 00500-5 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT 9.7 This Contract and the Contract Documents, insofar as they relate in any part or in any way to the Work undertaken therein, constitute the entire agreement between the parties hereto, and it is expressly understood and agreed that there are no agreements or promises by and between said parties, except as aforesaid, and that any additions thereto or changes shall be in writing. 9.8 The provisions of this Contract shall be applied and interpreted in a manner consistent with each other so as to carry out the purposes and the intent of the parties, but if for any reason any provision is unenforceable or invalid, such provisions shall be deemed severed from this Contract and the remaining provisions shall be carried out with the same force and effect as if the severed provision had not been part of this Contract. 9.9 The headings of the paragraphs are included solely for the convenience of reference and if there is any conflict between the headings and the text of this Contract, the Contract text shall control. 9.10 The waiver of any breach hereof shall not constitute a waiver of any subsequent breach of the same or any other provision hereof. Failure by the OWNER in any instance to insist upon observance or performance by CONTRACTOR shall not be deemed a waiver by CONTRACTOR of any such observance or performance. No waiver will be binding upon OWNER unless in writing and then will be for the particular instance only. Payment of any sum by OWNER to CONTRACTOR with knowledge of any breach or default will not be deemed a waiver of such breach or default or any other breach or default. 9.11 The CONTRACTOR acknowledges that the OWNER(through its employee handbook)considers the following to be misconduct that is grounds for termination of an employee of the OWNER: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the OWNER. The CONTRACTOR agrees that it will not, directly or indirectly; cause an employee of the OWNER to engage in such misconduct. 9.12 The CONTRACTOR agrees to comply with Appendix A (attached)of the City of Pearland's Title VI Nondiscrimination Plan Assurances. 2-2015 00500-6of7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to OWNER and one to CONTRACTOR. This Agreement will be effective upon execution and attestation by authorized representatives of the City of Pearland and upon the following date: April 27th, , 2015. OWNER: CONT' '2 OR: CITY OF P' . AN P SER / str .ct.1 'a tners, LLC. By: ���� By: L�/Y�L Title: ci. Pe. son Cit Mana•er Title: Rosbel . 'am s President Date: April 2 , 2 01 5 Date: April 27th,2015 (Corporate Seal) ATTEST iAi "LIL/ A ST �.�/ � oung . Ong, AMC pr i 7, 2 01 5 Address for giving notic s ?L4iy�%� 3636 Pasadena-B . :34--1 I Pasadena,Texas 77503 =U %\ ---i� .../11111\\\��```` Phone: 713-473-7900 Fax: 713-473-7919 Agent for service of process: Rosbel E. Ramos END OF SECTION 2-2015 00500-7 of 7 Title VI Nondiscrimination Assurances APPENDIX A During the performance of this contract, the contractor, for itself, its assignees and successors in interest (hereinafter referred to as the "contractor") agrees as follows: (1) Compliance with Regulations: The contractor shall comply with the Regulations relative to nondiscrimination in Federally-Assisted programs of the Department of Transportation (hereinafter, "DOT') Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract. (2) Nondiscrimination: The contractor, with regard to the work performed by it during the contract, shall not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Regulations. (3) Solicitations for Subcontracts, including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin. (4) Information and Reports: The contractor shall provide all information and reports required by the Regulations or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Sub-Recipient or the Federal Highway Administration to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information the contractor shall so certify to the Sub-Recipient, or the Federal Highway Administration as appropriate, and shall set forth what efforts it has made to obtain the information. (5) Sanctions for Noncompliance: In the event of the contractor's noncompliance with the nondiscrimination provisions of this contract,the Sub-Recipient shall impose such contract sanctions as it or the Federal Highway Administration may determine to be appropriate, including, but not limited to: (a) withholding of payments to the contractor under the contract until the contractor complies, and/or (b) cancellation, termination or suspension of the contract, in whole or in part. (6) Incorporation of Provisions:The contractor shall include the provisions of paragraphs (1) through (6) in every subcontract,including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The contractor shall take such action with respect to any subcontract or procurement as the Sub-Recipient or the Federal Highway Administration may direct as a means of enforcing such provisions including sanctions for non-compliance. Provided, however, that, in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the contractor may request the Sub-Recipient to enter into such litigation to protect the interests of the Sub-Recipient, and,in addition, the contractor may request the United States to enter into such litigation to protect the interests of the United States. CITY OF PEARLAND PERFORMANCE BOND BOND NO. 46BCSGV8949 Section 00610 PERFORMANCE BOND STATE OF TEXAS § COUNTY OF BRAZORIA § KNOW ALL MEN BY THESE PRESENTS: That SER Construction Partners, LLC of the City of Pasadena , County of Harris , and State of Texas, as principal, and Hartford Fire Insurance Company authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee (Owner), in the penal sum of$ 3,308,684.25 for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns,jointly and severally,by these presents: WHEREAS, the Principal has entered into a certain written contract with the Owner, effective as of the 214._ day of ilk v , 20 k5 , (the "Contract") to commence and complete the construction of certain improvements described as follows: Regnecy Park Subdivision Paving and Drainage Project City of Pearland, Texas COP PN: TR 1402 BID NO.: 0115-15 which Contract, including the Contract Documents as defined therein, is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Contract Work and shall in all respects duly and faithfully observe and perform all and singular the covenants, conditions, and agreements in and by said Contract agreed and covenanted by the Principal to be observed and performed, and according to the true intent and meaning of said Contract and Contract Documents, then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the Work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work to be performed thereunder. 12/2007 00610- 1 of 2 CITY OF PEARLAND PERFORMANCE BOND IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this 2N1-, day of koc:A , 2015. Principal: Surety: SER Co s uction art r , LL Hartford Fire I s anc`.��. p y By: / chele Bonnin Title: Rosbel E. Ramos, President Title: Y Attorne In-Fact Address: Address: P. O. Box 891145 3000 Internet Blvd., Suite 600 Houston, Texas 77289 Frisco, Texas 75034-1991 Telephone: (713)473-7900 Telephone: (800) 873-8212 Fax: (713)473-7919 Fax: (866)275-5989 NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. END OF SECTION 12/2007 00610-2 of 2 CITY OF PEARLAND PAYMENT BOND BOND NO.46BCSGV8949 Section 00611 PAYMENT BOND STATE OF TEXAS § COUNTY OF BRAZORIA § KNOW ALL MEN BY THESE PRESENTS: That SER Construction Partners, LLC of the City of Pasadena , County of Harris , and State of Texas, as principal, and Hartford Fire Insurance Company authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee (Owner), in the penal sum of$ 3,308,684.25 for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns,jointly and severally,by these presents: WHEREAS, the Principal has entered into a certain written contract with the Owner, effective as of the 2:70-,day of t.t_p c i , 20►S, (the "Contract") to commence and complete the construction of certain improvements described as follows: Regnecy Park Subdivision Paving and Drainage Project City of Pearland,Texas COP PN: TR 1402 BID NO.: 0115-15 which Contract, including the Contract Documents as defined therein, is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor or material to him or a subcontractor in the prosecution of the Work provided for in said Contract, then, this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the Work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work to be performed thereunder. 07/2006 00611 - 1 of 2 CITY OF PEARLAND PAYMENT BOND IN WITNESS F, the said Principal and d Surety have signed and sealed this instrument this Z-71t,day of k,Pr41 , 20j Principal: Surety: SER C-- •.tructio, P.�n- s S�C Hartford Fir sur.lc= • ny By: 1%7 y: Michele iOnnin Title: Rosbel : . R.� os, President Title: Attorney-In-Fact Address: Address: P. O. Box 891145 3000 Internet Blvd., Suite 600 Houston, Texas 77289 Frisco, Texas 75034-1991 Telephone: (713)473-7900 Telephone: (800) 873-8212 Fax: (713)473-7919 Fax: (866)275-5989 NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. END OF SECTION 07/2006 00611 -2 of 2 CITY OF PEARLAND ONE-YEAR MAINTENANCE BOND BOND NO. 46BCSGV8949 Section 00612 ONE-YEAR MAINTENANCE BOND STATE OF TEXAS § COUNTY OF BRAZORIA § KNOW ALL MEN BY THESE PRESENTS: That SER Construction Partners, LLC of the City of Pasadena , County of Harris , and State of Texas, as principal, and Hartford Fire Insurance Company authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee (Owner), in the penal sum of$ 3,308,684.25 for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns,jointly and severally,by these presents: WHEREAS, the Principal has entered into a certain written contract with the Owner, effective as of the 2-7 day of k E t , 20 IS , (the "Contract") to commence and complete the construction of certain improvements described as follows: Regnecy Park Subdivision Paving and Drainage Project City of Pearland, Texas COP PN: TR 1402 BID NO.: 0115-15 which Contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully correct all such work not in accordance with the Contract Documents discovered within the one-year period from the date of substantial completion, then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract,or to the work to be performed thereunder. 07/2006 00612- 1 of 2 CITY OF PEARLAND ONE-YEAR MAINTENANCE BOND IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this 21 Os day of JLec-A , 20 l S. Principal: Surety: SER Cold ction 'a L,r-, L C Hartfo d F;` i7surall :A. .ny B : IIAWkI _ _ B : AWN %/� ` By: y Michele :onnin Title: Rosbel E. Ramos, President Title: Attorney-In-Fact Address: Address: P. O. Box 891145 3000 Internet Blvd., Suite 600 Houston, Texas 77289 Frisco, Texas 75034-1991 Telephone: (713)473-7900 Telephone: (800)873-8212 Fax: (713)473-7919 Fax: (866)275-5989 NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. END OF SECTION 07/2006 00612-2 of 2 • Direct Inquiries/Claims to: POWER OF ATTORNEY THE HARTFORD BOND,T-4 ONE HARTFORD PLAZA HARTFORD,CONNECTICUT 06155 call:888-266-3488 or fax:860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 61-615323&46-508152 X Hartford Fire Insurance Company,a corporation duly organized under the laws of the State of Connecticut X Hartford Casualty Insurance Company,a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company,a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast,a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the"Companies")do hereby make, constitute and appoint, up to the amount of unlimited: Philip Baker, Edward Arens, Michele Bonnin, Erica Anne Cox, Jillian McKenzie of The Woodlands, TX their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies)only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof,on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on August 1, 2009 the Companies have caused these presents to be signed by its Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies,the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. ttrz icy' /''"�i err r� fj1. • • .r•r(days " moo* i:: 1970 ,-t tD7:)/ �• �i;:,;'r. ' 5 ��p� °% j+, j� 3;`.•• • c£ � '.y;I9?9 ,r Rfq.... beaaN - !Ip•.>'� d • hu.oi5• Via. \ �•• Wesley W.Cowling,Assistant Secretary M. Ross Fisher,Vice President STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD On this 12th day of July, 2012, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. ,4rt T.AC44. • Arauc R Kathleen T.Maynard Notary Public CERTIFICATE My Commission Expires July 31.2016 I, the undersigned, Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which is still in full force effective as of Signed and sealed at the City of Hartford. TEA, ,,ttrz w ri r bbd �:et:\ �t�t.,,R,rr 'i a iQ _ ,. I r ve4.bt,r J 0nDMO•A• tsez • ; 1°•at• • • F1 aIi V '. ! ro.a,ety' •• �•+rAd� r'. 19 7 0).` 1-t\1a 7 4� r� �r ,g. LGjr. •••• /+, .�r`O fit.✓ , I9Y9 (7:C/116} w �� Gary W.Stumper,Vice President ThE HARTFORD Inquiries Regarding Claims Hartford Fire Insurance Company Twin City Insurance Company Hartford Casualty Insurance Company Hartford Insurance Company of Illinois Hartford Accident and Indemnity Company Hartford insurance Company of the Midwest Hartford Underwriters Insurance Company Hartford Insurance Company of the Southeast Please address inquiries regarding Claims for all surety and fidelity products issued by The Hartford's underwriting companies to the following: Phone Number : 888-266-3488 Fax - Claims 860-757-5835 or 860-547-8265 E-mail : claims @lstepsurety.com Mailing Address : The Hartford The Hartford Fidelity&Bonding(BOND) Hartford Plaza 690 Asylum Avenue Hartford, CT 06115 TABULATION OF BIDS Resolution No. R2015-70 Bid No.0115-15 Regency Park Subdivision Paving&Drainage 1.,,,,,,c or re'gyp CITY OF PEARLAND a RECEIVED AND OPENED ON 04/14/2015 @ 2:00 PM Prepared By:JMB 04/20/15 BIDDER NUMBER 1 ENGINEER'S OPINION OF PROBABLE SER Construction Partners.LLC CONSTRUCTION COST 3636 Pasadena Blvd.Pasadena,TX 77503 Item Unit Description Unit Quantity Unit Price Total Amount Unit Price Total Amount No.1 Mobilization(3%Maximum) LS 1 $95,000.00 $ 95,000.00 $ 80,000.00 $ 80,000.00 2 Furnish Performance and Payment Bonds and Insurance LS 1 $42,000.00 $ 42,000.00 $ 25,000.00 $ 25,000.00 3 Tree Protection and Trimming Services including Fencing,Zero Curb Cut and Vapor Barriers,Complete-in-Place,In Accordance with the Plans and Specifications LS 1 $37,500.00 $ 37,500.00 $ 45,000.00 $ 45,000.00 4 Tree Removal(1"to 11.99"Diameter),Complete-in-Place,In Accordance with the Plans and Specifications EA 1 $937.50 $ 937.50 $ 150.00 $ 150.00 5 Tree Removal(12"to 29.99"Diameter),Complete-in-Place,In Accordance with the Plans and Specifications EA 16 $1,500.00 $ 24,000.00, $ 750.00 $ 12,000.00 6 Tree Removal(30"to 50"Diameter).Complete-in-Place,In Accordance with the Plans and Specifications EA 2 $2,500.00, $ 5,000.00 $ 2,500.00 $ 5,000.00 7 Furnish,Install and Maintain Traffic Control Devices and appurtenances,in accordance with the Texas Manual on Uniform Traffic Control Devices (Latest Edition),Complete-in-Place,In Accordance with the Plans and Specifications LS 1 $40,000.00 $ 40,000.00 $ 80,000.00 $ 80,000.00 8 Furnish Flaggers,in accordance with the Texas Manual on Uniform Traffic Control Devices(Latest Edition),Complete-in-Place,In Accordance with the Plans and Specifications LS 1 $37,500.00 $ 37,500.00 $ 15,000.00 $ 15,000.00 9 Videotaping of Construction,Complete-in-Place,In Accordance with the Plans and Specifications LS 1 $3,750.00 $ 3,750.00 $ 1.000.00 $ 1,000.00 10 Furnish and Install Metal Beam Guard Fence(Timber Post),Complete-in- Place,In Accordance with the Plans and Specifications LF 90 $92.10 $ 8,289.00 $ 75.00 $ 6,750.00 11 Furnish and Install Gate with Signs and Knox Box,Complete-in-Place,In Accordance with the Plans and Specifications EA 2 $1,875.00 $ 3,750.00 $ 3,500.00 $ 7,000.00 12 Remove and Reinstall Mailboxes,Traffic Signs,Street Signs,Fences,etc. as Necessary to Accomplish Work,Complete-in-Place,In Accordance with the Plans and Specifications LS 1 $12,500.00 $ 12,500.00 $ 5,000.00 $ 5,000.00 13 Remove and Dispose of Old Concrete Pavement including Curbs(All Depths),Complete-in-Place,In Accordance with the Plans and Specifications SY 17700 $13.00 $ 230,100.00 $ 4.00 $ 70,800.00 14 Remove and Dispose of Old Concrete Driveways and Sidewalks(All Depths),Complete-in-Place,In Accordance with the Plans and Specifications SY 3300 $9.00 $ 29,700.00 $ 5.00 $ 16,500.00 15 Adjust Existing Manhole to New Grade,Complete-in-Place,In Accordance with the Plans and Specifications LS 1 $729.70 $ 729.70 $ 1,000.00 $ 1,000.00 16 Adjust Existing Valve Box to Finished Grade,Complete-in-Place,In Accordance with the Plans and Specifications LS 1 $371.90 $ 371.90 $ 1.000.00 $ 1,000.00 17 Adjust Existing Pull Box to Finished Grade,Complete-in-Place,In Accordance with the Plans and Specifications LS 1 $812.50 $ 812.50 $ 1,000.00 $ 1,000.00 18 Roadway Excavation including Stripping and Off-site Disposal Outside of City Limits,Complete-in-Place,In Accordance with the Plans and Specifications CY 1450 $21.00 $ 30,450.00 $ 10.00 $ 14,500.00 19 Furnish Embankment,Complete-in-Place,In Accordance with the Plans and Specifications CY 400 $5.10 $ 2,040.00 $ 15.00 $ 6,000.00 20 Prepare and Compact 6"Lime Stabilized Subgrade,Complete-in-Place,In Accordance with the Plans and Specifications SY 18818 $6.00 $ 112,908.00 $ 3.50 $ 65,863.00 21 Furnish Lime(6%by Dry Weight),Complete-in-Place,In Accordance with the Plans and Specifications TON 565 $187.50 $ 105,937.50 ,$ 170.00 $ 96,050.00 22 Furnish and Install 6"Reinforced Concrete Pavement,Complete-in-Place, In Accordance with the Plans and Specifications SY 16000 $56.00 $ 896,000.00 $ 45.00 $ 720,000.00 23 Furnish and Install 6"High Early Strength Reinforced Concrete Pavement, Complete-in-Place,In Accordance with the Plans and Specifications SY 2600 $59.00 $ 153,400.00 $ 55.00 $ 143,000.00 24 Furnish and Install 4"Reinforced Concrete Sidewalks,Complete-in-Place, In Accordance with the Plans and Specifications SF 2500 $5.90 $ 14,750.00 $ 6.00 $ 15,000.00 25 Furnish and Install Access Landing,Complete-in-Place,In Accordance with the Plans and Specifications EA 1 $1,237.20 $ 1,237.20 $ 1,500.00 $ 1,500.00 26 Furnish and Install 6"Reinforced Concrete Driveways,Complete-in-Place, In Accordance with the Plans and Specifications SY 3250 $49.40 $ 160,550.00 $ 60.00 $ 195,000.00 27 Furnish and Install Temporary Residential Driveway,In Accordance with the Plans and Specifications EA 85 $315.60 $ 26,826.00 $ 500.00 $ 42,500.00 28 Furnish and Install Temporary Commercial Driveway,In Accordance with the Plans and Specifications EA 2 $378.10 $ 756.20 $ 1,000.00 $ 2,000.00 29 Furnish and Install Temporary 6-inch Black Base as directed by Engineer, In Accordance with the Plans and Specifications SY 225 $43.00 $ 9,675.00 $ 150.00 $ 33,750.00 30 Furnish and Install 4-inch Wide Thermoplastic Pavement Marking,In Accordance with the Plans and Specifications LF 675 $1.30 $ 877.50 $ 4.00 $ 2.700.00, 31 Blast Cleaning for 4-inch Wide Thermoplastic Pavement Marking,In Accordance with the Plans and Specifications LF 675 $1.30 $ 877.50 $ 2.00 $ 1,350.00 32 Furnish and Install 6-inch Reinforced Concrete Curb,Complete-in-Place,In Accordance with the Plans and Specifications LF 11250 $3.50 $ 39,375.00 ,$ 4.00 $ 45,000.00 33 Remove and Dispose of Existing 12"Pipe,Complete-in-Place,In Accordance with the Plans and Specifications LF 60 $28.40 $ 1,704.00 $ 13.00 $ 780.00 34 Remove and Dispose of Existing 15"Pipe,Complete-in-Place.In Accordance with the Plans and Specifications LF 250_ $32.90 $ 8,225.00 $ 15.00_$ 3,750.00 152211 4(20/2015 TABULATION OF BIDS Bid No.0115-15 Regency Park Subdivision Paving&Drainage �,..t"" ��±i i, T CITY OF PEARLAND RECEIVED AND OPENED ON 0411412015 @ 2:00 PM t l .- Prepared By:JMB k 04/20/15 BIDDER NUMBER 1 ENGINEER'S OPINION OF PROBABLE SER Construction Partners,LLC CONSTRUCTION COST 3636 Pasadena Blvd.Pasadena.TX 77503 Item Unit Description Unit Quantity Unit Price Total Amount Unit Price Total Amount No.35 Remove and Dispose of Existing 18"Pipe,Complete-in-Place,In Accordance with the Plans and Specifications LF 205 $34.20 $ 7,011.00 $ 18.00 $ 3,690.00 36 Remove and Dispose of Existing 24"Pipe,Complete-in-Place,In Accordance with the Plans and Specifications LF 75 $38.00 $ 2,850.00 $ 20.00 $ 1,500.00 37 Remove and Dispose of Existing 30"Pipe,Complete-in-Place,In Accordance with the Plans and Specifications LF 60 $41.30 $ 2,478.00 $ 25.00 $ 1,500.00 38 Remove and Dispose of Existing Inlet,Complete-in-Place,In Accordance with the Plans and Specifications EA 15 $415.60 $ 6.234.00 $ 400.00 $ 6,000.00 39 Remove and Dispose of Existing Manhole,Complete-in-Place,In Accordance with the Plans and Specifications EA 5 $415.60 $ 2,078.00 $ 500.00 $ 2,500.00 40 Furnish and Install 13.5"x 22"Reinforced Concrete Arch Pipe,All Depths, Complete-in-Place,In Accordance with the Plans and Specifications LF 240 $140.50 $ 33,720.00 $ 110.00 $ 26.400.00 41 Furnish and Install 18"x 28.5"Reinforced Concrete Arch Pipe,All Depths, Complete-in-Place,In Accordance with the Plans and Specifications LF 360 $156.60 $ 56,376.00 $ 150.00 $ 54,000.00 42 Furnish and Install 18"RCP(Class III C-76),All Depths,Complete-in- Place,In Accordance with the Plans and Specifications LF 264 $112.10 $ 29,594.40-$ 75.00 $ 19,800.00 43 Furnish and Install 24"RCP(Class III C-76),All Depths,Complete-in- Place,In Accordance with the Plans and Specifications LF 972 $118.20 $ 114,890.40 $ 80.00 $ 77,760.00 44 Furnish and Install 30"RCP(Class III C-76),All Depths,Complete-in- Place,In Accordance with the Plans and Specifications LF 52 $144.40 $ 7,508.80 $ 115.00 $ 5.980.00 45 Install 10'x 6'RCB,All Depths,Complete-in-Place,In Accordance with the Plans and Specifications(10'x 6'RCB to be Furnished By Others) LF 60 $207.20 $ 12,432.00 $ 1,250.00 $ 75,000.00 46 Furnish and Install Type'A'Inlet,Complete-in-Place,In Accordance with the Plans and Specifications EA 1 $1,884A0, $ 1,884.40 $ 2,000.00 $ 2,000.00 47 Furnish and Install Type'C'Inlet,Complete-in-Place,In Accordance with the Plans and Specifications EA 25 $2,134.40 $ 53.360.00 $ 3,200.00 $ 80,000.00 48 Furnish and Install Type'B-B'Inlet,Complete-in-Place,In Accordance with the Plans and Specifications EA 2 $2,134.40 $ 4,268.80 $ 3,200.00 $ 6,400.00 49 Furnish and Install Storm Manhole,Complete-in-Place,In Accordance with the Plans and Specifications EA 12 $2,179.70 $ 26,156.40 $ 3,500.00 $ 42.000.00 50 Furnish and Install Metal Curb Opening for Yard Drain,Complete-in-Place, In Accordance with the Plans and Specifications EA 8 $215.60 $ 1,724.80 $ 315.00 $ 2,520.00 51 Furnish and Install 6-inch Concrete Slope Paving,Complete-in-Place,In Accordance with the Plans and Specifications SY 30 $73.70 $ 2,211.00 $ 75.00 $ 2,250.00 52 Trench safety System Construction of Storm Sewer,Complete-in-Place,In Accordance with the Plans and Specifications LF 1888 $0.10 $ 188.80 $ 1.50 $ 2,832.00 53 Furnish and Install Block Sodding,Complete-in-Place,In Accordance with the Plans and Specifications SY 12500 $4.20 $ 52,500.00 $ 4.00 $ 50,000.00 54 Furnish and Install Hydromulch Seeding,Complete-in-Place,In Accordance with the Plans and Specifications AC 0.5 $2,056.30 $ 1,028.15 $ 1,500.00 $ 750.00 55 Furnish and Install Inlet Protection Barrier(Stage I),Complete-in-Place,In Accordance with the Plans and Specifications EA 27 $43.10 $ 1,163.70 $ 75.00 $ 2,025.00 56 Furnish and Install Inlet Protection Barrier(Stage II),Complete-in-Place,In Accordance with the Plans and Specifications EA 26 $43.10 $ 1,120.60 $ 75.00 $ 1,950.00 57 Furnish and Install Rock Filter Dam,Complete-in-Place,In Accordance with the Plans and Specifications EA 3 $1,418.80 $ 4,256.40 $ 1,500.00 $ 4,500.00 58 Furnish and Install Stabilized Construction Exit,Complete-in-Place,In Accordance with the Plans and Specifications EA 1 $956.30 $ 956.30 $ 1,500.00 $ 1,500.00 59 Furnish and Install Reinforced Filter Fabric Fence,Complete-in-Place,In Accordance with the Plans and Specifications LF 250 $3.10 $ 775.00 $ 2.00 $ 500.00 60 Portable Concrete Truck Washout Structures LS 1 $625.00 $ 625.00 $ 2,500.00 $ 2,500.00 61 Furnish and Install 6" Waterline,Trenchless Construction,including Fittings,Thrust Blocking,Restrained Joints,and Appurtenances,Complete- in-Place,In Accordance with the Plans and Specifications LF 250 $45.60 $ 11,400.00 $ 65.00 $ 16,250.00 62 Furnish and Install 8"Waterline,Trenchless Construction,including Fittings,Thrust Blocking,Restrained Joints,and Appurtenances,Complete- in-Place,In Accordance with the Plans and Specifications LF 5400 $66.20 $ 357,480.00 $ 75.00 $ 405,000.00 63 Furnish and Install 8"DIP Waterline,including Fittings,Thrust Blocking, Restrained Joints,and Appurtenances,Complete-in-Place,In Accordance with the Plans and Specifications LF 60 $99.20 $ 5,952.00, $ 95.00 $ 5,700.00 64 Trench Safety System Waterline Construction(All Depths),Complete-in- Place,In Accordance with the Plans and Specifications LF 500 $0.10 $ 50.00 $ 2.00 $ 1,000.00 65 Furnish and Install 8"Gate Valve with Box,Complete-in-Place,In Accordance with the Plans and Specifications EA 16 $1,120.70 $ 17,931.20 $ 1,500.00 $ 24,000.00 66 Furnish and Install Fire Hydrant Assembly,AWWA 502,Mechanical Joint Inlet,incl.Fire Hydrant,6"Lead,6"Gate Valve with Box and Barrel Extensions,ALL DEPTHS,Complete-in-Place,In Accordance with the Plans and Specifications EA 6 $4,011.90 $ 24,071.40 $ 5,000.00 $ 30,000.00 67 Remove and Salvage Existing Fire Hydrant,Complete-in-Place,In Accordance with the Plans and Specifications EA 4 $235.90 $ 943.60 $ 625.00 $ 2,500.00 68 Furnish and Install 8"Wet Connection,Complete-in-Place,In Accordance with the Plans and Specifications _EA _ 1 $1,105.50 $ 1,105.50 $ 850.00_$ 850.00 152211 4/20/2015 TABULATION OF BIDS �t or r� Bid No.0115-15 Regency Park Subdivision Paving&Drainage .'y {'i ....--4.) CITY OF PEARLAND • RECEIVED AND OPENED ON 04/14/2015 @ 2:00 PM Prepared By:JMB 04/20/15 BIDDER NUMBER 1 ENGINEER'S OPINION OF PROBABLE SER Construction Partners,LLC CONSTRUCTION COST 3838 Pasadena Blvd,Pasadena,TX 77503 Item Item Description Meais Quantity Unit Price Total Amount Unit Price Total Amount 69 Furnish and Install 6-inch Plug and Clamp,Complete-in-Place,In Accordance with the Plans and Specifications EA 1 $186.10 $ 186.10 $ 500.00 $ 500.00 70 Furnish and Install 8-inch Plug and Clamp,Complete-in-Place,In Accordance with the Plans and Specifications EA 1 $247.70 $ 247.70 $ 750.00 $ 750.00 71 Cut,Plug,and Abandon Existing 6"Water Main,Complete-in-Place,In Accordance with the Plans and Specifications EA 1 $170.30 $ 170.30 $ 300.00 $ 300.00 72 Relocate Existing Water Meter,Complete-in-Place,In Accordance with the Plans and Specifications EA 1 $384.40 $ 384.40 $ 400.00 $ 400.00 73 Adjust Existing Water Meter to Finished Grade,Complete-in-Place,In Accordance with the Plans and Specifications EA 1 $418.80 $ 418.80 $ 200.00 $ 200.00 74 Furnish and Install 1"Single Short Service Replacement Incl.Reconnect To Meter,Complete-in-Place,In Accordance with the Plans and Specifications EA 55 $1,201.60 $ 66,088.00 $ 500.00 $ 27,500.00 75 Furnish and Install 1"Single Long Service Replacement Incl.Reconnect To Meter,Complete-in-Place,In Accordance with the Plans and Specifications EA 28 $2,090.60 $ 58,536.80 $ 750.00 $ 21,000.00 76 Furnish and Install Well Pointing Systems as directed by Engineer, Complete-in-Place,In Accordance with the Plans and Specifications LF 1000 $1.30 $ 1,300.00 $ 20.00 $ 20,000.00 77 Furnish and Install 8-inch San.Swr.,150 psi,at Waterline Crossings as directed by Engineer,Complete-in-Place,In Accordance with the Plans and Specifications LF 60 $67.20 $ 4,032.00 $ 85.00 $ 5,100.00 78 Furnish and Install 22.5"x 36.25"Reinforced Concrete Arch Pipe,All Depths,Complete-in-Place,In Accordance with the Plans and Specifications LF 60 $126.00 $ 7,560.00 $ 175.00 $ 10,500.00 79 Furnish and Install Flow Stop Service for Temporarily Stopping Flow in Pipe,6",Complete-in-Place,In Accordance with the Plans and Specifications EA 2 $625.00 $ 1,250.00 $ 6.000.00 $ 12,000.00 80 Furnish and Install Flow Stop Service for Temporarily Stopping Flow in Pipe,8",Complete-in-Place,In Accordance with the Plans and Specifications EA 2 $875.00 $ 1,750.00 $ 8,000.00 $ 16,000.00 81 Furnish and Install 2"Single Long Side Water Service Connection, Complete-in-Place,In Accordance with the Plans and Specifications EA 2 $1,750.00 $ 3,500.00 $ 1,000.00 $ 2,000.00 82 Furnish and Install 2"Single Short Side Water Service Connection, Complete-in-Place,In Accordance with the Plans and Specifications EA 2 $1,125.00 $ 2,250.00 $ 750.00 $ 1,500.00 83 Extra Select Backfill as Directed by the Engineer,Complete-in-Place,In Accordance with the Plans and Specifications($15/CY Minimum Bid) CY 250 $80.00 $ 20,000.00 $ 15.00 $ 3,750.00 84 Extra Bank-Sand Backfill as Directed by the Engineer,Complete-in-Place, In Accordance with the Plans and Specifications($20/CY Minimum Bid) CY 250 $20.00 $ 5,000.00 $ 20.00 $ 5,000.00 85 Extra Wet-Sand Bedding as Directed by the Engineer,Complete-in-Place, In Accordance with the Plans and Specifications($20/CY Minimum Bid) CY 250 $20.00 $ 5,000.00 $ 20.00 $ 5,000.00 86 Extra Class"A"Cement Stabilized Sand Backfill as directed by Engineer, Complete-in-Place.In Accordance with the Plans and Specifications(Min Bid.$50/TON) TON 400 $50.00 $ 20,000.00 $ 60.00 $ 24,000.00 87 Extra Waterline Fittings,Complete-in-Place,In Accordance with the Plans and Specifications($1500/TON Minimum Bid) TON 2 $1,500.00 $ 3,000.00 $ 1,500.00 $ 3.000.00 88 Extra Class"A"Concrete,including forming,Complete-in-Place,In Accordance with the Plans and Specifications(Min Bid.$325/CY) CY 100, $325.00 $ 32,500.00 $ 325.00 $ 32,500.00 89 Extra Steel Reinforcing as Directed by the Engineer,Complete-in-Place,In Accordance with the Plans and Specifications($0.50/LB Minimum Bid) LB 4000 $0.50 $ 2,000.00 $ 0.50 $ 2,000.00 90 Furnish and Install Temporary Pavement Markings,Class I,As Directed by Engineer LF 1000 $1.30 $ 1,300.00 $ 3.00 $ 3,000.00 91 Furnish and Install Temporary Pavement Markings,Class II,As Directed by Engineer LF 1000 $1.30 $ 1,300.00 $ 3.00 $ 3,000.00 92 Pot Hole for Utility Investigation-As Directed by Engineer EA 5 $1,250.00 $ 6,250.00 $ 500.00 $ 2,500.00 93 Extra Machine Excavation as directed by the Engineer,Complete-in-Place, In Accordance with the Plans and Specifications($15/CY Minimum Bid) CY 250 $15.00 $ 3,750.00 $ 15.00 $ 3,750.00 94 Extra Hand Excavation as directed by the Engineer,Complete-in-Place,In Accordance with the Plans and Specifications($20/CY Minimum Bid) CY 250 $20.00 $ 5,000.00 $ 20.00 $ 5,000.00 95 Furnish and Install 8"Waterline with Steel Casing,Trenchless Construction,including Fittings,Restrained Joints,and Appurtenances, Complete-in-Place,In Accordance with the Plans and Specifications LF 145_ $465.00 $ 67.425.00 $ 235.00 $ 34,075.00 96 Furnish and Install 16-inch by 8-inch Tapping Sleeve and Valve with Box, Complete-in-Place,In Accordance with the Plans and Specifications EA 1 $4,630.00 $ 4,630.00 $ 8,000.00 $ 8,000.00 SUBTOTAL BASE BID ITEMS $ 3,109,887.25 $ 2.772.750.00 SUBTOTAL EXTRA WORK BID ITEMS $ 126.742.00 $ 159,600.00 SUBTOTAL ADD ALTERNATE ITEMS $ 72,055.00 $ 42,075.00 TOTAL AMOUNT BID $ 3,308,684.25 $ 2,974,425.00 152211 4/20/2015 7 - Binkley Barfield consulting engineers April 20, 2015 Ms.Jennifer Lee Project Manager City of Pearland 3519 Liberty Drive Pearland,Texas 77581 Reference: Regency Park Subdivision Paving and Drainage Project Contractor Award Recommendation BBI Job No. 152211 Dear Ms. Lee: Bids were publicly opened and read at 2:00 pm on April 14, 2015 for the above-referenced project. The following is a summary of our bid evaluation. 1. Bid Tabulation -A copy of the bid tabulation is attached. A summary of the total amount for each of the submitted bids is as follows. Only one bid was received and is listed below. Contractor Amount 1. SER Construction Partners, LLC $3,308,684.25 The only bid received was approximately 10% higher than the opinion of probable construction costs. The majority of the delta was identified under the paving bid items. Concrete removal was approximately 45% to 70% higher than estimated, subgrade preparation and concrete placement unit costs were approximately 10%to 20%higher than estimated. The increased unit costs could be attributed to market demands for concrete, truck drivers for disposing of material and supplying concrete, the phasing of construction work within the subdivision, and limited working hours per City requirements. 2. Bid Bond—SER Construction Partners, LLC provided a bid bond through an "A" rated bonding company. The Contractor's ability to bond this project indicates a level of financial stability. SER Construction Partners,LLC has been a responsible firm on previous projects for numerous clients and is capable of performing the specified work in a satisfactory manner. Binkley & Barfield, Inc. recommends that the City of Pearland award the Regency Park Subdivision Paving and Drainage Project to SER Construction Partners,LLC for the amount of Three Million,Three Hundred Eight Thousand, Six Hundred Eighty-four Dollars and Twenty-five Cents ($3,308,684.25). Binkley&Barfield,Inc.I Registration No. F-257• 1710 Seamist Drive-Houston,Texas 77008•Tel:713.869.3433 I Fax:713.869.6702•wwau.BinkleyBarfield.com Binkley April 20, 2015 Barfield Page 2 consulting engineers If you have any questions, please contact me. Sincerely, .•� . OF T f�`'� % Binkley&Barfield, Inc. I*/ .*ti, Consulting Engineers = =':.►r BRcxk. • 96725 • • p.! Jason Brock, P.E. 04/20/2015 Project Manager—Public Works Attachment Binkley&Barfield,Inc. Registration No. F-257 • 1710 Seamist Drive-Houston,T2cas 77008• Tel:713.869.34331 Fax:713.869.6702 •www.BinkleyBarfield.com . ..., / f.1 r----,ir. . • • lc- I* ' . "" g i, " " ,, - ! p f.• . ; . A.4,t, ..'w''' f- - f t ' 4 1.st. ''''' •'• ' . ' - - - ME:: .i.■:;.1;ii: ,; : . . ..,. ;.-,. I ' • iFic:617. ' s'i '4, .4 1 - l 4 • tIP* .•'' -• • lb al . : - . j■" , .. 5.:.. 1.1b 4 e ',$)". • • • , -. 4' 1 i 4 ... . , . • .-.0, • ,...-. ,°':. . . . i . , - -- , I .4 , .• 0° . .. . . h . - - - .. 4 4 . . - 4•47 :,„'-.; ' . •- 4: 4' „,_ 4 ..t. , $4 t ,. 61,, er.e• , i 6 l'• ' • ...,,,„,,,,, i -a„. -- 1! ' .1:-4, . tt..Ab it it il'1,°t*, ''-i."1--; 14if ..ili "'", -...1. %: f ' .I. 7 * :.... 4.•, " l'it' 1.., , N' 41, Ni';'' '. ':, ..cr.' 1, * 4,tit limp .,..., - • -:- • - . J • , . . . ... .• „. 4* • , :44 •' ..r. "N .. p., "."-. 1., .` 'ol .A- .,.. . . • , ... .. . , . -:e ' , ,, I. . 141. 114:110*.j.1: • ti .. .-- __. -Y \_ trabiic" ,..14!.. ■" _------- _ N., ,.. .. _,_,,,•"" * r — 1. ,'‘'..,:, :'', .' . .-.,..--•'—ik-'-.. - . --.7,-.- , '"E. ,. ,, 1 „, • ', .. • •,,...' ' ••., At .1 '''' '144 ...."": ' • ss, - .. ....4 •• „.„,,, : ' e -.'" .". . ''' - r';'1 f' ' -''14 ' N ' • 47. ' e ''• ./...--' ,` -.'.. :t: , 40. ,•'; lc. • , -- • 'II.\ ,4 • , , . t.i...:. .. .... t 4 • ,-... 4 ,, ,_ . . . .4,,,,. .,.. of. 7-4 . . ,,. 4 j. „ ,,tt\ ,1 , , ,•: '. ' '4r. .• 0, ll .I• .: • ) • '',,4, '' ;.• . _ . ' . 1, t. t' ' ' ' ' • . , ? . ..- ,.014' , . '''. . . '.”' I .1:: • . • . • ' ' ' '• ' Ji . I,. N -.•••• • '. • '' ' 2.,. --- -7° .;.-•. •__'___f_•,!t(/ .." . 1 • . . 1 • A 4t •• ----.----- — **1 k. ,- '--,.•.`-‘1•: .:' - - li '-- ----; -- — —— - - .. , . .• . ___.....--:-,.,„- --. ., ...' •-• -4, ___ __ —____ ....4., . V tf ... 4.. • 1 I i' . • - , 4.:. ' " 1 .- , 1 - , . _ , ..C.'''.4'k 4• • / ' ' t'''''Ir"-. 0 ,.. " g '..`. • •9 "t'An „ yf -4.. .. , .....,.., i , , .....1.1.„4 . / / . ..._. . , a ... , . ... , .1._ - . . .....-.2„,,,,.,..,. . .. .-.. .4., -,. 41.1 .. „. ,04".^'' '••• •••/ .." 't,.... ' '. .1•••44' - • .11114„ 0 • • IN Ls.' ;-at 74/1 . - •->e, . .- , • t .. ■ -, --1 .,.... 1,- . -". .... .- ., 4 . ' .... ' -t!, ,.. ..„ .- .. , , -•• , :10. - .".1„. ,,-.Na . , •, , ", , ,.e., .*4. at:: . •. .• . .1' . ._ 44 • 4,. 's!.:r r.••1.- - .':*. .. i CC1 • ..... TT ,.... ..„. . . . ' r? .. .'1, '- ___' A kr 1-*• . 'As , -.4 . -,,...---. --„„•- ; •. -,.., .4- , • . ...',.. •:, -..., -------,-.-7--77---, - . . , 7 ., _ • ,,,,.. a ,. ). ... -.1. ' ' $ • ' .*:/ *1 • ; 8 W 0 1 ' ICC li.- --— --- 1),,I . 1k. , . ,. • ...a 1... , a?./.i, 1 . . ; . . (....) .,. • .. , I . ,. . ,- - . . ...-; 4-..) •4' • • 4' 4‘ • • '- i• i t i . C..) . * !jp 0 . •„^„n_ . . , I V I 9 414S4k • • .....Allitt: • :...., P-i , •, , it, 7 • . i ,. . ' ? . 4 ... . . „,.. or .. ._._.......... . - It 1.1' 77-- -----T.r . '11. low . )44 7.. ) _... • .. C.....) ... l' .- .1. it..,.• .‘,40, . • , II, 1 ' -. • . •. • . "1 i • • •4■4 ' 4 . •t„ , . • ,. al e . . . . .. • __... .„, kw .. •, .ik , ....„.. T .. . .: . II • a i .- - - - i 0 tfr.. 41.-; ,: ' gib - ' •4' . '':, et,,t3 4P to r- .- ''. . • " ----qv oi,-1 -.••., . ' - 14 f. . ... _ .._,2-............