Loading...
R-2015-036 2015-02-23RESOLUTION NO. R2015-36 A Resolution of the City Council of the City of Pearland, Texas, authorizing the City Manager or his designee to enter into Agreements with CenterPoint Energy Houston Electric, LLC, ("CenterPoint") for (1) the removal and relocation of power lines near Fruge Road and (2) the installation of underground primary conductors along Kirby Drive from Fruge Road north approximately 1500 feet. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain Agreements by and between the City of Pearland and CenterPoint, a copies of which is attached hereto and made a part hereof for all purposes, are hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Agreements with CenterPoint. PASSED, APPROVED and ADOPTED this the 23rdday of February, A.D., 2015. ATTEST: APPROVED AS TO FORM: (L„ DARRIN M. COKER CITY ATTORNEY • TOM REID MAYOR 0. =U� Resolution No. R2015-36 Exhibit "A" Chapter 6: Company Specific Items CenterPoint Energy Houston Electric, LLC Applicable: Entire Service Area 6.3 AGREEMENTS AND FORMS 6.3.1 FACILITIES EXTENSION AGREEMENT Sheet No. 6.24 Page 1 of 2 CNP 8038 This Facilities Extension Agreement is entered into by and between CITY OF PEARLAND , herein called "Retail Customer" and CenterPoint Energy Houston Electric, LLC, herein called "Company" (hereinafter referred to as Agreement) for the construction, extension, installation, modification, repair, upgrade, conversion, relocation, de-energization or removal of Company's Delivery System, including temporaiy facilities (hereinafter referred to as facilities extension or extension), as described herein. This Agreement covers the facilities extension to Retail Customer location at 15015 KIRBY DR., PEARLAND, TEXAS 77584 The Company agrees to accept payment of S 49, 164.00 Dollars to be paid by the Retail Customer, as a Non -Refundable Construction Payment in connection with the Retail Customer request to extend Company facilities to the above described location as follows: INSTALLATION OF OVERHEAD DISTRIBUTION INCLUDING (4) TERMINAL POLES (3) 250 KVA STEP DOWN TRANSFORMERS AND REMOVAL OF EXISTING OVERHEAD DISTRIBUTION CROSSING KIRBY DR.: RIGHT OF WAY. • Unless otherwise stated by Company in writing, the Non -Refundable Construction Payment amount above is valid for twelve months. In consideration of said Non -Refundable Payment, to be paid to Company by Retail Customer prior to commencement of construction, Company agrees to install and operate lines and equipment necessary to distribute electric service to the identified location under the following General Conditions: • Company shall at all times have title to and complete ownership and control over facilities installed by Company. • Retail Customer must make satisfactory payment arrangements (if payment is required to extend Company facilities) and sign and return this Agreement before Company can proceed with the requested extension. Revision Number: 5th 306 Effective: 9/1/11 Chapter 6: Company Specific Items CenterPoint Energy Houston Electric, LLC Applicable: Entire Service Area Sheet No. 6.24 Page 2 of 2 CNP 8038 • Extension of service facilities is contingent on acquisition of all necessary easements and rights of way. Nothing herein contained within this Agreement shall be construed as a waiver or relinquishment by Company of any right that it has or may hereafter have to discontinue service for or on account of default in the payment of any bill owing or to become owing thereafter for any other reason or cause stated in Company's Tariff. This Agreement shall not be binding upon Company unless and until it is signed by an authorized representative of the Company. CenterPoint Energy Houston Electric, LLC Retail Customer By i w N " By Jon Branson JO A.SALINAS (name printed or typed) (name printed or typed) Title SR. SERVICE CONSULTANT Title Date 06/11/2014 Deputy City Manager Date 02/23/2015 Revision Number: 5th307 Effective: 9/1/11 9 JJ9IHX3 CenterPoint. Energy June 6, 2014 RE: Terms and Conditions Package CITY OF PEARLAND Overhead to Underground Relocation Kirby from Fruge north 1500' Pearland, TX Job 1168829612 Dear Customer: CenterPoint Energy 3000 Harrisburg Blvd. #A Houston, Texas 77003 Please reference the enclosed Terms & Conditions (T&C) package Job 1168829612 in response to a request by Trent Epperson of the City of Pearland in a meeting on May 12, 2013 to provide cost for the relocation of existing overhead feeder mains to underground along Kirby from Fruge north approximately 1500 feet. The cost of Centerpoint Energy's construction is as follows: Underground Primary (conduits and manholes by City of Pearland) $ 276,000.00 Total The cost listed above do not include overhead removal and any other overhead construction. Those cost will be provided in a separate FEA by John Salinas from H. 0. Clarke Service Center. The customer will be responsible for the construction of the duct lines and manholes. The customer will construct those items according to the specifications within the T&C package which is attached. The referenced T&C package and cost are effective for 365 days from June 6, 2014 provided the field conditions existing as of this date and location of the facilities shown on the sketches within the T&C package remain the same. After that time, the T&C package and estimates must be reviewed by the Major Underground Engineering department (MUG) and the Overhead Service Center before a final commitment can be made. The information contained within the T&C package is applicable for the life of the service. If the T&C package is in accordance with your understanding, we would appreciate a representative for City of Pearland Indicating acceptance by signing the cover sheet of the T&C package and the applicable Facilities Extension Agreements (FEA). Please return the signed original of the FEA and the cover sheet of the T&C package to me at 3000A Harrisburg Boulevard, Houston Texas 77003 along with the remittance in the amount listed on the FEA. That will be our authority to proceed with this project. Page 1 1 CenterPoint. Iv Energy If you have any questions, please contact me at the number below. Sincerely, Norbert D. Gonzales Lead Engineering Specialist 713-207-6168 norbert.gonzales@centerpointenergv.com Page 1 2 CenterPoint Energy 3000 Harrisburg Blvd. #A Houston, Texas 77003 REFERENCE Site Utility REFERENCE Service Ready Reviewed TERMS & CONDITIONS UNDERGROUND ELECTRIC SERVICE, FOR CITY OF PEARLAND OVERHEAD RELOCATION TO UNDERGROUND Kirby from Fruge to 1500' north Job #68829612 CenterPoint Energy (CNP) Major Underground Engineering P. O. Box 1700; Houston, Texas 77251-1700 DRAWINGS: Plan Received: None Plan & Profile Drawing: None CENTERPOINT ENERGY SPECIFICATIONS: Standards• . April 1 , 2014 -Mix Concrete• . 007-221-01 And Agreed To B Deputy City Manager 02/23/2015 Signature Title Jon Branson an official will be package. Date from CITY Print If this Terms & Conditions package OF PEARLAND it will not be Name is signed by considered valid. within anyone other than A valid signature this Tenns & Conditions considered an acceptance of all information contained CenterPoint Energy Houston, Texas WRITTEN NDG 06/06/2014 CHECKED NOG 06/06/2014 APPROVED RED 06/06/2014 SHEET 1 OF 14 SHEETS NO. DATE ITEMS REVISED [Y CH APP F00573 Job 1168829612 GENERAL A. These Terms and Conditions are for the installation of underground facilities in place of proposed overhead facilities for CITY OF PEARLAND. CITY OF PEARI,AND and/or its contractors/representatives are herein referred to as the Customer. B. The CNP Major Underground Engineering (MUG) representative is Norbert Gonzales at 713-207-6168 or Norbert.Gonzales@CenterPointEnergy.com. The CNP Service Area Consultant is John Salinas at 713-945-4484 or John.Salinas@centerpointenergy.com. C. The Customer must comply with all CNP Service Standards, the National Electrical Code, the National Electrical Safety Code, all Occupational Safety and Health Administration (OSHA) requirements, the International Building Code and all local governing body codes. D. During installation of CNP equipment, CNP will make every effort to preserve the Customer's landscaping, parking areas, or other facilities. However, any cost that has been quoted to the Customer does not include any special replacements or repairs to these items. The Customer shall be solely responsible for any expenses associated with replacements or repairs to its facilities. E. The service arrangement outlined in these Terms and Conditions is based on the Customer request and customer drawings referenced on page 1. Any changes in the design as illustrated in the referenced drawings may impact CNP's ability to meet the Customer's requested service date. Any changes, additions, deletions, rearrangements, relocations, rerouting, reduction of clearances, etc., of the Customer's and/or CNP's service facilities illustrated in these Terms and Conditions shall have the MUG's approval and may require a revised Terms and Conditions. It is the Customer's responsibility to coordinate the location of all Customer installed facilities outlined in these Terms and Conditions with all other structures and/or appurtenances not shown in the referenced drawings. F. Contact the MUG representative concerning Customer drawing revisions, information submission, questions, Terms and Conditions revision requests, etc. G. Hard copy submittals may be mailed to the MUG representative (address — 3000A Harrisburg Blvd. — Houston, Texas 77003). Electronic submittals may be e-mailed to the MUD Engineering representative. The MUG representative will; "approve the submittals", "approve the submittals as noted" or "not approve the submittals". The Customer shall not install any item that requires CNP approval before receiving an official approval from the MUG. CNP shall not be responsible for any installed item that has not received MUG approval. H. CNP requires a minimum of 90 calendar days for the installation of the underground cables and framing of the associated terminal poles. Then the overhead removal can begin. CNP owned poles will be removed after aerial telecom facilities have been removed. No CNP poles will be allowed to remain for the use of telecom or other facilities if CNP distribution facilities are removed from those poles. REVISION NO. SPECIFICATION NO. SHEET 2 OF 14 SHEETS Job 1168829612 ACCESS The Customer must provide a twelve foot (12') minimum width, fourteen foot (14') minimum vertical clearance, all weather, vehicle access road designed for HS -20-44 loading as recognized by the American Association of State Highway Officials (AASHO), for CNP personnel and equipment to the proposed terminal poles and manholes. If the access road has not been completed and passed final inspection (sec Final Inspection, page 5) at the time the Customer requests the cable to be installed, the cable can only be set under the following conditions. A. The MUG has determined that the access route is dry and readily accessible to CNP's normal installation equipment. B. The Customer shall be responsible for all expenses associated with the repair and/or replacement of CNP underground facilities damaged by additional construction activity. Damage to CNP equipment may result in delays to the Customer's requested service date. C. CNP will not complete the underground construction (i.e. pulling & terminating cable, energizing the service, etc.) until the access road and duct bank location has passed final inspection (see Final Inspection, page 5). The Customer must maintain these requirements for the life of the service. CNP will utilize the existing streets Fruge, Kirby and the existing paved parking areas for the required access. PLAN AND PROFILE DRAWINGS The Customer must provide plan and profile drawings for the installation of all underground facilities around the construction area. The Customer is also required to obtain all applicable construction permits from the appropriate governing authorities. The plan and profile drawings must be in accordance with CNP standards attached. These drawings must be approved by CNP and the appropriate governing authorities before beginning the installation of underground facilities (duct bank, manholes, etc.). It is recommended that the Customer meet with the MUG representative to discuss the preparation of the drawings. The Customer shall supply CNP with mylar originals and electronic files of the approved final drawings CNP will keep the original approved drawings on file and furnish one (1) copy to the Customer. If the Customer requests additional copies, CNP will arrange to supply copies or reproducible mylars at the Customer's expense. If the actual installation differs from the proposed routing on the drawings, then the Customer shall provide CNP with one (1) set of bluelines, rnarked in red pencil, to indicate AS BUILT corrections. REVISION NO. SPECIFICATION NO. SHEET 3 OF 14 SHEETS Job 1168829612 TRAFFIC CONTROL PLAN The Customer must provide a traffic control plan that has been approved by the appropriate governing authorities before beginning the installation of underground facilities (duct bank, manholes, etc.). FACILITIES INSTALLED BY THE CUSTOMER All facilities are to be installed per the attached construction specifications. The Customer or its contractor is to request a preconstruction meeting prior to starting the required underground construction by calling the number listed below. All facilities shall be inspected by CNP after the conduit is installed; pads are formed, reinforcing rods installed, etc. but prior to the pouring of concrete. CNP recommends that the Customer complete the pouring of concrete on the day the facilities are inspected and approved. The Customer will insure that all inspected and approved facilities remain in the approved condition until the concrete pour has been completed. If there is damage to the inspected and approved facilities prior to the pouring of concrete, the facilities must be re -inspected by CNP before the Customer begins the pouring of concrete. CNP reserves the right to require the Customer to break out any unapproved concrete pours at its expense. CNP will make a reasonable attempt to complete all inspection requests. To insure that inspection requests can be fulfilled, they should be made twenty-four (24) hours in advance (Mon. - Fri.; between 9:00 a.m. and 3:00 p.m., holidays excluded) to the MUG at (713) 207-6229. Job #68829612 must be provided as the inspection identification number. DUCT BANK INSTALLATION All proposed conduit for CNP's use is to be installed in straight runs, unless otherwise indicated on CNP drawings. Any conduit bends other than ninety degrees must be installed with a three-foot (3') minimum radius, unless indicated otherwise on CNP drawings. All ninety degree bends, conduit turn -ups into any equipment pad and/or pole pedestal must have a minimum five-foot (5') radius. Any deviations from these requirements shall have written approval from the MUG representative prior to installation. During installation, the minimum depth for a conduit run must be referenced to the final grade. The Customer is to delay installation of approximately the last twenty feet (20') of the conduit run and the pole pedestal to any terminal pole until the pole has been set by CNP. Before trenching to the base of any terminal pole, the Customer must securely brace the pole. The Customer must request staking and setting of any terminal pole by contacting the Service Area Consultant. The Customer must provide a jet line in each conduit installed. This jet line shall extend a minimum of seven feet (7') beyond the end of each conduit. REVISION NO. SPECIFICATION NO. I -I- J SHEET 4 OF 14 SHEETS Job #68829612 DUCT BANK INSTALLATION (CONTINUED) Conduit ends shall be plugged with a conduit cap or plug. The use of rags and or tape to plug conduits is not acceptable. If the conduit is installed in stages, the Customer must keep each section of conduit sealed until the new section is installed. If, prior to CNP using any conduit, the conduit is found to be blocked, the Customer will be responsible, at its expense, for removing the obstruction. CLEARANCES Final approval for the location of the terminal poles and manholes is contingent upon proper clearance, as determined by CNP, from cooling towers, vents, buildings, structures, etc., and other underground utilities. It is in the Customer's and CNP's best interest to have all service equipment in a contamination -free environment to avoid unscheduled outages and/or premature equipment failures. Therefore, prior to any construction, the Customer shall inform the MUG representative of any existing or future contamination or pollutants which may affect the equipment so that necessary clearances can be secured. The MUG representative shall be notified promptly if the Customer intends to install any obstructions such as walls, hedges, bushes, trees, etc., around the transformer and/or any associated equipment so that additional clearances and access can be secured. Any proposed enclosure surrounding CNP's equipment must be louvered, and both a profile and a cross-sectional view of the proposed louvered enclosure shall be submitted for approval prior to installation. If, in the future, there is a problem with contamination of CNP's equipment, or proper clearances are not maintained, CNP reserves the right to relocate the equipment at the Customer's expense. A one foot (1') minimum vertical clearance must be maintained between CNP duct banks and all non -CNP facilities crossing the duct bank. A five foot (5') minimum horizontal clearance must be maintained between CNP duct banks and other facilities running parallel to the duct bank. CNP will not allow joint trenching between CNP duct banks and other facilities. No telecommunication, electrical, or any other entities facilities' are to use CNP terminal poles as a point to riser from underground to overhead. Existing aerial attachments to the terminal poles may be accommodated if approved by the MUG representative. In order to maintain proper clearances the installation of taller terminal poles or relocation of the foreign attachments may be required FINAL INSPECTION After the Customer has advised CNP that all "Customer installed" facilities pertaining to this service arrangement have been completed and inspected, a final on-site inspection will be made by a MUG representative. This final inspection will verify that all Customer installed facilities are in accordance with these Terms and Conditions. The Customer (or its contractor) and the Service Area Consultant will be advised of any needed corrections and/or changes. When all necessary corrections and/or changes have been completed, CNP's portion of the construction may begin REVISION NO. SPECIFICATION NO. SHEET 5 OF 14 SHEETS Job #68829612 INDEMNIFICATION AND LIABILITY LIMITS Indemnity: This indemnity is pursuant to Company's Tariff located on our website at www.centerpointenergy.com. Indemnity: This indemnity is pursuant to Company's Tariff located on our website at www.centerpointenergy.com. RETAIL CUSTOMER ASSUMES THE RISK OF AND SIIALL INDEMNIFY COMPANY AGAINST DAMAGES FOR INJURIES OR DEATH TO PERSONS OR LOSS TO RETAIL CUSTOMER'S PROPERTY, OR TO THE PROPERTY OF COMPANY, WHEN OCCASIONED BY ACTIVITIES OF RETAIL CUSTOMER OR THIRD PARTIES ON CUSTOMER'S PREMISES, RESULTING FROM THE INSTALLATION, EXISTENCE, REPLACEMRNT, OR REPAIR OF COMPANY'S UNDERGROUND FACILITIES, AND AS FURTHER PROVIDED IN THE TERMS OF "LIMITS ON LIABILITY," SECTIONS 4.2 AND 5.2 OF THIS TARIFF. NOTWITHSTANDING ANY OF THE ABOVE, THE PROVISIONS REQUIRING A RETAIL CUSTOMER TO INDEMNIFY, FULLY PROTECT, OR SAVE COMPANY HARMLESS APPLY TO A GOVERNMENTAL ENTITY AS THIS TERM IS DEFINED IN CHAPTER 2251 OF THE TEXAS GOVERNMENT CODE, TO THE EXTENT OTHERWISE CONSISTENT WITH LAW; PROVIDED, HOWEVER, THAT ANY GOVERNMENTAL ENTITY THAT IS A RETAIL CUSTOMER TO WHICH THIS SUBSECTION 2.5 APPLIES MUST TAKE NECESSARY STEPS TO ENSURE THAT THE INDEMNIFICATION REQUIREMENTS OF THIS SUBSECTION 2.5 DO NOT CREATE A "DEBT" IN VIOLATION OF ARTICLE XI, SECTION 7 OF THE TEXAS CONSTITUTION. SUCH STEPS MAY INCLUDE, BUT ARE NOT NECESSARILY LIMITED TO, A THIRD -PARTY INDEMNIFICATION IN WHICH THE CONTRACTOR PERFORMING THE WORK FOR THE GOVERNMENTAL ENTITY INDEMNIFIES THE COMPANY OR THE ESTABLISHMENT OF A SINKING FUND. (see Governmental Entity Addendum if applicable.) REVISION NO. SPECIFICATION NO. SHEET 6 OF 14 SHEETS 4'-0' MINIMUM FINAL GRADE (ROAD, PARKING AREA, ETC.) SHEET u 7 OF 14 JOB 0 68829612 • • • E z m :4- _L. __ 1 I a _ t.. T I• .wa� _ v ..� . ti -14 '1.' •-121:--14 L -i .-r ''4 • 2' 2 4. 2 2 - 6' 4 - 6, CONDUITS 6 - 6' CONDUITS CONDUITS DRIVE #3 REBAR FOR SPACER ANCHOR (SEE NOTE 7) SPACER (SEE NOTE 2) #3 BARS 3'-0" LONG (SEE NOTE 5) (BOTTOM OF TRENCH) NOTE: 2 BRICKS THE CUSTOMER AND/OR ITS CONTRACTOR IS TO REOUEST A PRECONSTRUCTION MEETING PRIOR TO STARTING CONSTRUCTION BY CALLING (713) 207-6229. NOTES: 1. CONDUIT TO BE PVC, MINIMUM GRADE TYPE E8. 2. SPACERS SHOULD BE INSTALLED NOT MORE THAN 10'-0' APART. 3. CONDUITS TERMINATING AT MANHOLES SHOULD BE SLOPED 0.5% DOWN TOWARD MANHOLE. 4. ALL EXTERIOR CONCRETE COVER DIMENSIONS ARE MINIMUM. 5. CONCRETE SHALL BE IN ACCORDANCE WITH CNP SPECIFICATION 007-221-01,LATEST REVISION. 6. PLACE REINFORCING BARS IN 4 CORNERS OF THE CONCRETE WHERE SPACERS ARE USED. 7. ON COLD JOINT CONCRETE POUR USE *5 REBAR (3'-0' IN LENGTH. EXPOSED 1'-6'). 8. LENGTH OF REBAR FOR SPACER ANCHOR WILL VARY PER DUCT BANK HEIGHT. 9. CONDUITS ENDS SHALL BE PLUGGED WITH A DUCT CAP OR OTHER TYPE OF CAPPING DEVICE. 10. A ONE FOOT VERTICAL CLEARANCE MUST BE MAINTAINED BETWEEN CNP'S DUCTBANK ANO ALL NON -CNP FACILITIES CROSSING THE DUCTBANK. 11. A FIVE FOOT HORIZONTAL CLEARANCE MUST BE MAINTAINED BETWEEN CNP'S DUCTBANK ANO ALL NON -CNP FACILITIES RUNNING PARALLEL TO THE DUCTBANK (JOINT TRENCHING NOT PERMITTED). THREE PHASE DUCTBANK 12. INSTALL JET LINE IN ALL CONDUITS AND A *14 AWG WIRE FEEDER IN ONE CONDUIT. BASED ON DISTRIBUTION STANDARD DLFS2C PROP 6-6" DUCT BELL TERMINATOR PROP 6-6" TO MH #02 4. .. 9'-4" 9' -105'8' BL 8" STABILIZED SAND PULLING EYE PLAN VIEW 1'-0" MIN. TO HIGHEST CONDUIT 1'-0" MIN. TO LOWEST CONDUIT to PVC PIPE SLEEVE SECTION A -A NOTES: 1. CNP RECOMMENDS THE INSTALLATION OF THE REOUIRED DUCTBELL TERMINATORS BY THE MANHOLE SUPPLIER ON ALL PRECAST MANHOLES. 2. MANHOLES ARE TO BE PLACED ON A MINIMUM OF SIX (6) INCH LEVELED BASE OF SAND OR CRUSHED ROCK TO INSURE UNIFORM DISTRIBUTION OF SOIL PRESSURE ON THE FLOOR. 3. CNP MUST INSPECT THIS REOUIREMENT PRIOR TO THE INSTALLATION OF THE MANHOLE INSIDE THE EXPOSED PIT. 4. THE USE OF PRECAST NECKS IS NOT APPROVED. SHEET 8 OF 14 JOB #68829612 32" CASTING WITH COVER BRICK 1" ' GROUT ., �1?r M& ' . it • t � . '. . : : •OHO. • SECTION B -B MANHOLE #1 LARGE THREE WAY MANHOLE 12KV & 35KV BASED ON DISTRIBUTION STANDARD MH300 LAS Br 2'-8' SLEEVE PVC PIPE Os PULLING EYE PROP 6-6" TO MH 404 t. PROP 4-6" TO TP# 3.4 8 7' _81,T 9'-4" 9' -105'e, BL 8" STABILIZED SAND PROP 6-6" TO MH #02 PLAN VIEW PULLING EYE ,0Q. Q 1'-0" MIN. TO HIGHEST CONDUIT 1'-0" MIN. TO LOWEST CONDUIT -o PVC PIPE SLEEVE SECTION A -A NOTES: 1. CNP RECOMMENDS THE INSTALLATION OF THE REOUIRED DUCTBELL TERMINATORS BY THE MANHOLE SUPPLIER ON ALL PRECAST MANHOLES. 2. MANHOLES ARE TO BE PLACED ON A MINIMUM OF SIX (6) INCH LEVELED BASE OF SAND OR CRUSHED ROCK TO INSURE UNIFORM DISTRIBUTION OF SOIL PRESSURE ON THE FLOOR. 3. CNP MUST INSPECT THIS REOUIREMENT PRIOR TO THE INSTALLATION OF THE MANHOLE INSIDE THE EXPOSED PIT. 4. THE USE OF PRECAST NECKS IS NOT APPROVED. T io MCC SHEET 9 OF 14 JOB #68829612 32" CASTING WITH COVER BRICK 1 "e2' GROUT • w 0 z J J a � •1 SECTION B -B MANHOLE #3 LARGE THREE WAY MANHOLE 12KV & 35KV BASED ON DISTRIBUTION STANDARD MH300 13 PROP 6-6" DUCT BELL TERMINATOR DUCT BELL TERMINATO 9'-4" B(� 8" STABILIZED SAND PLAN VIEW SHEET 10 OF 14 JOB #68829612 32" CASTING WITH COVER BRICK 1"2' GROUT 4 N PULLING EYE - 11" 1 1' -O" MIN. TO • ••i HIGHEST CONDUIT ''•> 1'-0" MIN. TD -P- LOWEST CONDUIT PVC PIPE SLEEVE SECTION A -A NOTES: 1. CNP RECOMMENDS THE INSTALLATION OF THE REQUIRED DUCTBELL TERMINATORS BY THE MANHOLE SUPPLIER ON ALL PRECAST MANHOLES. 2. MANHOLES ARE TO BE PLACED ON A MINIMUM OF SIX (6) INCH LEVELED BASE OF SAND OR CRUSHED ROCK TO INSURE UNIFORM DISTRIBUTION OF SOIL PRESSURE ON THE FLOOR. 3. CNP MUST INSPECT THIS REQUIREMENT PRIOR TO THE INSTALLATION OF THE MANHOLE INSIDE THE EXPOSED PIT. 4. THE USE OF PRECAST NECKS IS NOT APPROVED. PULLING EYE V' • SECTION B -B MANHOLE #2.4.5 LARGE THREE WAY MANHOLE 12KV & 35KV BASED ON DISTRIBUTION STANDARD MH300 SCRAP PVC SEE NOTE 5 BY CNP BY CUSTOMER GROUND LINE ry SEE NOTE 6 NON -THREADED PVC COUPLING CONDUIT 5' R CONCRETE L. INLINE PLACEMENT OF CONDUIT NOTES: 1. CONDUIT BENDS AT TERMINAL POLE SHALL BE PVC. 2. BRACE THE POLE SECURELY BEFORE TRENCHING. 3. INSTALL CONDUIT BENDS TO BASE OF POLE. ADD PORTIONS OF STRAIGHT CONDUIT AS NECESSARY TO OBTAIN THE PROPER HEIGHT ABOVE FINAL GRADE. 4. ATTACH COUPLING TO END OF CONDUIT. 5. INSERT, BUT DO NOT GLUE, A SHORT PIECE OF SCRAP PVC CONDUIT INTO THE TOP COUPLING. TIE CONDUIT TO BRACKET. 6. FORM AREA AROUND PEDESTAL TO THE TOP OF THE COUPLING. FORM PEDESTAL SO THAT NO CONCRETE WILL CONTACT POLE. 7. AFTER INSPECTION BY CNP, POUR CONCRETE TO TOP OF COUPLINGS. 8. ALL CONDUITS SHALL HAVE A MINIMUM 4' CONCRETE COVER. SHEET 11 OF 14 JOB " 6882%12 TERMINAL POLE #12.3.4 TERMINAL POLE CONDUIT PLACEMENT 12KV & 35 KV BASED ON DISTRIBUTION STANDARD 65-500 CenterPoint Energy MAJOR UNDERGROUND ENGINEERING WORKING SKETCH LAMBERT NO. KEY MAP CIRCUIT FUNCTIONAL LOCATION SCALE JOB NO. 5350-C4 612D SO -46 PROP. CNP SMALL SAY MANHOLE NTS NTS SHEET : 12 OF 14 68829612 PPVC CCNP �ITS6' CONC. ENCASED 388' KIRBY DR -PROP. CNP SMALL 3 -WAY MANHOLE •04 KIRBY DR & FRUGE RD DRAWN BY: EARL JONES 11 LAMBERT NO. KEY MAP CenterPoint Energy MAJOR UNDERGROUND ENGINEERING WORKING SKETCH CIRCUIT FUNCTIONAL LOCATION SCALE JOB NO. SHEET : 13 OF 14 5350-C4 612D NTS NTS NTS 68829612 388' ± CNP 6-6' PVC CONDUITS CONC. ENCASED PROP. CNP 2-6' PVC CONDUITS CONC. ENCASED TINA PROP. CNP 2-6' PVC CONOUI S CONC. ENCASED TP63 PROP. p..-6• PVC CDNDU TS CONC. ENCASED (-1 PROP. CNP 6-6' PVC CONDUITS CONC. ENCASED PROP. CNP SMALL 3 -WAY MANHOLE 603 4' + MATCH LINE B-B KIRBY DR KIRBY DR & FRUGE RD DRAWN BY: EARL JONES 11 LAMBERT NO. KEY MAP CenterPoint Energy MAJOR UNDERGROUND ENGINEERING WORKING SKETCH CIRCUIT FUNCTIONAL LOCATION 5350-C4 612D NTS NTS SCALE NTS SHEET : 14 OF 14 JOB NO. 68829612 4 l PROP. CNP 2-6' l PVC CONDUITS CONC. ENCASED TP#I CO PROP. CNP 2-6' WPVC CONDUITS Z CONC. ENCASED J 7: PROP. CNP SMALL F 1 -WAY MANHOLE v01 PROP. CNP 6-6" PVC CONDUITS CONC. ENCASED PROP. CNP SMALL - - - 3 -WAY MANHOLEm02 --�-- ,374_} KIRBY DR PROP. CNP 4-6 PVC CONDUITS CONC. ENCASED KIRBY DR & FRUGE RD DRAWN BY: EARL JONES 11