BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That certain contract by and between the City of Pearland and Turner,
Collie and Braden, Inc., ("T C & B)for Program Management of the Pearland Mobility and
Drainage Bond Program was authorized by the City Council on December 10, 2001.
Section 2. That T C & B has developed work authorizations, which are attached
hereto as Exhibits "A" and "B" respectively.
Section 3. That the work authorizations for engineering services associated with
the Pearland Mobility and Drainage Bond Program are hereby approved.
PASSED, APPROVED and ADOPTED this the 28 dayof ,January ,
A.D., 2002.
ATTEST:
APPROVED AS TO FORM:
DARRIN M. COKER
CITY ATTORNEY
TOM REID
MAYOR
ATTACHMENT D
WORK AUTHORIZATION NO. 2
Exhibit "A"
R2002-18 1 of 2
This Work Authorization is made pursuant to the terms and conditions of the Pearland
_Mobility'& Drainage Bond Program, hereinafter identified as the "Contract", entered into
by and between the City of Pearland ("City"), and Tumer Collie & Braden Inc.
("Engineer).
PART 1. Work Authorization No. 2 is related to Miscellaneous Road Improvement
Projects, Group 1 including; Old Alvin - Broadway to Plum, the Magnolia and McLean
intersection and the Fite and Harkey intersection. The Engineer will perform
Topographic Survey services and Geotechnical Investigation under this Authorization.
PART 2. The maximum amount payable for services under this Work Authorization is
$127,733.35. This amount is based on the following: See attached fee proposals
submitted by: TSC Engineering for Survey dated January 17, 2002 in the amount of
$31,200.00; TSC Engineering for Basic Design Services, Drainage Report, Traffic
Control and SWPPP in the amount of $ 88,163.35 and HVJ Associates, Inc. for
Geotechnical dated January 18, 2001 in the amount of $8,370.00 for a total of
$127,733.35.
PART 3. Payment to the Engineer for the services established under this Work
Authorization shall be "Lump Sum".
PART 4. This Work Authorization shall become effective on January 28, 2002 and shall
terminate on November 12, 2005, unless extended by a supplemental work authorization.
PART 5. This Work Authorization does not waive the parties' responsibilities and
obligations provided under the contract.
PART 6. This Work Authorization is hereby accepted and acknowledged below.
ENG~FffR
~' ~,,/~_./O'C..,/- By:
By:
CITY OF PEARLAND
Larry F. Janak, P.E.
Typed or Printed Name
Typed or Printed Name
Senior Vice President
Title
LIST OF EXHIBITS
Exhibit A - Fee Schedule
Exhibit B - Work Schedule
Date Date
Turner Collie Braden Inc.
EXHIBIT A
FEE SCHEDULE
Pearland Mobility & Drainage Bond Program
Work Authorization No. 2
Summary
0112112002
project
Miscellaneous Road Improvements Group 1
Old Alvin - Broadway to Plum
Magnolia at McLean Intersection
Fire at Harkey Intersection
Etlgil~eering Services
Hydrologic & Hydraulic
Environmental Compliance
Topographic Survey
Geotech
ROW Maps & Documents
PS&E
Traffic Control
SWPPP
Direct Costs
ROW Acquisition Assistance
Materials Testing
Subtotal
TSC Engineering Company
TSC Engineering Company
HVJ Associates, Inc
TSC Engineering Company
TSC Engineering Company
TSC Engineering Company
TSC Engineering Company
Previous
Authorization
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Current
Authorization
$ 7,950.86
$ 31,200.00
$ 8,370.00
$59,949.47
$13,974.31
$4,538.72
$1,75O.OO
$127,733.36
Page 1 of 1
5C Surveying Company
~,250 t,%stpark Drive
Suite 210
Houston, Texas 77057-7304
713.7S4.440,6
Fa.'< 713.784.0900
surveytr~g.~orbitworM.net
January 17, 2002
Turner Collie & Braden Inc.
5757 Woodway
Houston, Texas 77057
Office: 713.780.4100
Fax: 713.780.0838
Attn: Mr. James W. Keller, P.E.
Senior Project Manager
Re:
Cost Proposal for Professional Surveying Services and Cadd Services for
the four following project: Project No. 2 (Old Alvin - Broadway to
Plum), Project No.6 (Magnolia at McLean) and Project 10a (Fite at
Harkey).
Dear Mr. Keller,
TSC Surveying Company (TSC) is pleased to submit the following cost proposal
for the captioned project.
Project Limits:
Project No. 2, Old Alvin - Broadway to Plum
Project: Widening, adding shoulder and left mm lanes.
Topographic survey from center line of Broadway to 300 feet north of Plum, 400
feet west of Old Alvin on Plum, 400 feet east of Old Alvin on Elum, full width
of Right-of-Way.
Project No. 6, Magnolia at McLean
Project: Adding left tum lanes on north, east and south sides of intersection.
Topographic survey 400 feet; north, south and east of intersection, and 100 feet
west of intersection, full width of Right-of-Way.
Project 10a, Fite at Harkey
Project: Adding left turn lanes at four directions to relieve congestion at school.
Topographic survey from center line ofh~tersection 800 feet north, 400 feet east,
400 feet south and 700 feet west, full width of Right-of-Way.
H:\INVOICES\SP0 I\SP013 lrl.DOC
Page 1 of 4
T$C Surveying Company
Scope of Services & Compensation
A. Establish Project Vertical Control
1. Recover existing Monuments with elevation datum and verify accuracy of the
published elevations.
2. Establish new benchmarks as required to establish vertical control at intervals
not to exceed 1000-feet along the proposed alignment.
3. Establish a horizontal position on all recovered and new benchmarks for
future recovery.
B. Establish Project Horizontal Control
Horizomal Control will be based upon the Texas State Plane coordinate
System, South Central Zone, NAD 83. All the coordinates will be Texas
State Plane Grid with the Surface conversion to be provided for future use.
2. Recover existing Monuments with horizontal datum and verify the accuracy
of the published coordinates.
3. Establish new project horizontal control points along the alignment at
intervals not to exceed 1000-feet.
C. Stake Proposed Alignment
The project baseline will be coincidental with, or parallel to, the stationed
"Design Cemer Line." Base line control points will be established using 5/8"
iron rods, 36" long, at PCs, Pis and PTs of horizontal curves and at 1000'
maximum intervals on tangents. This cemerline staking will be maintained
through completion of design and awarding of the construction contract.
2. The location of all soil core drill holes will be staked as determined by the
Engineer.
D. Topographic Surveying
Determine adjoining property owners from city and county records and
compile a list of owners. Obtain Right-of-Entry Letters from the adjoining
property owners to conduct topographic surveys.
H:\INVOICES\SP01\SP013 Itl.DOC
Page 2 of 4
TSC Surveying Company
Locate visible major topographic features to include, but not limited to, curb
lines, gutters, driveways, ditch lines, structures, major vegetation, signs,
contour break lines, sidewalks, fences, traffic signals, street lights, railroad
tracks, parking lots, mailboxes, buildings and other fixed features.
3. Topographic features will be obtained 50 feet beyond the existing right of
way for existing facilities.
Locate visible major utilities (i.e. power poles, manholes, pull boxes, pipeline
markers, fiber optic markers, etc.) and other utility features that may affect
the project. The direction and type of overhead wires shall be noted.
Locate all manholes, handholds and valves within the project. All manholes
shall be opened and size, direction and rim and flow elevations shall be
noted. The utility owners shall be contacted and the location, type and depth
of the facilities shall be determined in profile, along the proposed alignment.
The underground profile shall include storm sewer, sanitary' sewer, water,
electric, telephone, fiber optic, gas and other utility found within the project
limits.
7. The location, size, flow line anddirection of all cross drainage structures shall
be recorded.
8. Profile existing drainage facilities.
9. Establish elevations at all tied topographic features.
E. Right-of-Way Survey
1. Recover and verify existing Right-of-Way comers of the portion of the
dedicated parcels.
F. Preparation of Graphic Files
1. Prepare 2D CADD electronic file of planimetrics at the horizontal scale of
1"=40'.
2. Prepare 3D CADD electronic file of the project.
Perform CADD electronic file of the profile along the base line to include all
under ground utilities at a horizontal scale of 1"=20' and a vertical scale of
1 "=2'.
H:~INVOICES\SP0I\SP0131r 1.DOC
Page 3 of 4
TSC Surveying Company
G. Deliverables
Topographic Survey
1. 2D Graphic files o£ the plan view at 1"=40' depicting the field data, control
points (vertical and horizontal), Right-of-Way, property lines, and the base
line alignment.
2. Graphic file o£ the profile view at a horizontal scale o£ 1"=20' and a vertical
scale of 1"=2', including all underground utilities.
3. Hard copy o£the plan view.
4. 3D Graphic file of the project including all features voids and break lines.
5. ASCII point data file in electronic format with printout.
6. Copies of field notes.
7. Property owners' list and copy of signed Right-of-Entry Letters.
We propose to do the work described in the Scope of Services, based on a lump
sum fee, without further modifications is $31,200.00.
Submission Schedule & Deliverables
TSC recognizes the urgency of this project and proposes to begin work within
two (2) working days after receipt of written notice to proceed and will complete
the work within eighteen (18) calendar days.
We appreciate this oppOrtunity and look forward in working with you again. If
you have any questions, please call.
Sincerely~
/ ./'/:- ,/
Chuck Dawkin, R.P.L.S.
Senior Project Manager
cc: Proposal
H:\INVOICES\SP01\SP0131ri.DOC
Page 4 of 4
January l7,2002
Mt. James R. Keller, P.E.
Tumer, Collie & Braden
P.O. Box 130089
Houston, Texas77219
Re: Pearland Intersection Improvements (Revised)
TCB Job No. 13-11256
Dear Nh-. Keller:
It is with great pleasure that TSC Engineering Company submits this cost proposal for the design of
roadway capacity projects in the City of Pearland. These projects were described in package of
information provided by TCB to TSC Engineering Company on December 19, 2001 and include:
Project No. 2 Old Alvin - Broadway to Plum
This project will widen the existing asphalt pavement to 36 feet to accommodate a left mm lane and add
6 foot asphalt shoulders Broadway to north side of the Plum Intersection. This project will include the
reconstruction of the Plum Old Alvin intersection with left turn lanes utilizing concrete pavement. This
project is approximately 2,400 feet in length.
Project No. 6 Magnolia at McLean Intersection
This project will add left turn lanes on north, east and south sides of intersection, typically the turn lanes
are 200 feet long with a I00 foot transition.
Project 10a Fite @ Harkey
This project will add left turn lanes on all four legs of the intersection to relieve congestion at the
nearby school, culverts will be extended as necessary. The improvements will extend 600 feet to the
north and west and 300 feet to the south and east.
The scope of work will include the preparation of construction plans, specifications, and estimates for
the three projects noted above. This includes the preparation of a letter report on the drainage to cover
each location, it does not include the preparation of a detailed impact study or channel analysis. This
scope of work does not include the preparation of public or private utility relocation drawings, the
preparation of traffic signals or traffic studies of any type.
The total lump sum cost will be $88,163.35 as detailed in the attachment.
This estimate includes limited construction phase services to include review of shop drawings,
attending a prebid meeting and a preconstruction meeting and responding to requests for information
from the contractor referred to us through Turner, Collie & Braden.
flout;ton: 6250 Westpark Drive, Suite 2130 * [-[ouston, Texas 77057-7334 · 713.7S4.7777 · Fax 7[3 784.7733
Amarillo: 905 S. Fillmore, Suite 62(I o Amarillo, Texas 7910t-3541 · 80o.372.$700 · Fax g136.372.876';
Mr. James W. Keller, P.E.
January 17, 2002
Page 2
TSC Engineering Company does not foresee a problem with providing construction bid documents by
April 24, 2002 to meet the letting date proposed. This is based on TSC's production capability and any
extended or untimely reviews or review comments could jeopardize the completion date. ff you need
further clarification or additional information, don't hesitate to contact me.
Sincerely,
i-,... ! i ~:~
Brad White, P.E.
Senior Project Manager
Attachment
Xc: Contract File
Fee Schedule (Labor Cost)
TSC Engineering Company
PenTland Intersection improvements
Basic Engineering Fee
Clussification
Project Manage.
Senior Engineer
Design Engineer
Engineer Assistant
Tech/CADD Operator
Administrative Asstnt.
TralHc Control
Classification
Project Manage'
Senior Engineer
Design Engineer
Engineer Assistant
Tech/CADD Operator
Administrative Asstnt.
Draioage Report
Classification
Project lVlanager
Design Engineer
Engi neet Assistant
Admimstrafive Asstnt.
SWPPP
Classifiattion
Project Manager
Senior Engineer
Design Enginee'
Engineer Assistant
TechtCADD Operator
Administrative Asstnt.
Ma. nhottrs/
Crew hours
Rttte Cost
90 $ t 36.60 $12 29'*.36
80 $103.87 58,309.3 I
155 $94.72 514.681.60
125 $87.32 $10,915.00
170 $76.96 $13,083.20
15 $44.40 $666.00
635 $59,949.47
Prepare Traffic Control Plan for the construction of the four
projects described in the scope of work.
lffanhours/
Crew hours Rate
18
15
32
20
65
4
154
Cost
$136.60 $2,4.58.87
$103.87 $1,558.00
$94.72 $3,031.04
$87.32 $ 1,746.40
$76.96 $5,002.40
$44.40 $177.60
$13,974.31
Letter report describing how project will drain with storm sewer
calculations
Manhou rs/
Crew hours
Rate Cost
14 $136.60 $1,912.46
20 $94.72 $1.894.40
40 $94.72 $3,788.80
8 $44.40 $355.20
82 $7,950.86
Prepare Stro[nwater Pollution Prevention Plan for four projects
described in scope
Munhour.Ot
Crew hottrs Rate
6
5
12
~0
12
6
51
Cost
$136.60 $819.62
$103.87 $519.33
$94.72 $1,136.64
$87.32 $873.20
$76.96 $923.52
$44.40 $266.4O
$4,538.72
Summary
Basic Services
Traffic Control
Drainage Letter Report
SWPPP
Direct Costs(Printing. Mileage..)
I
Total I
Hours
T$C [
Engineehng
Base(Raw)
635 $59.949.47
154 $13,974.31
82 $7,950.86
51 $4,538.72
$t.750.00
922 $88,163.35
(Labor Cost) Page I of I (1117/O2)
(:~ootectnn~cal, Environmental & Materials Engineers
December 21,2001
6120 S. L~a;ryA~bford Read
i'feus:rjn, Yex2~ 77072
(,.8 l/923
(28!) 933-7293 ,~ax
h'Jp://www hvi.com
Mr. Jim Keller, P.E.
'l'umer Collic& Bradcn Inc.
5757 Woodwa7
l Iot.tslou, 'i'cxas 77057-1599
(kotechnical Stt:dy
City of Pentland Mobility and Drainage Program
Owner: City of Pentland
IIVJ Proposal No. 01-218PGH-0 (Revised January 18, 2002)
Dear Mr." '
· Keller:
In response to your request, HVJ Associates, Inc. is pleased to sub,nit this revised fcc proposal
t~r.p.rovi.ding a gcotcchn£cal study for the City of Pentland Mobility and Drainage Program. The
rcvmon ~s due to the removal of the Plum project from Old A. Ivin to Schleider and one additional
bori,g for thc etd Alvin Foject from Broadway to Plum. Wc understand that the scope of thc
proposed projects is preliminary at this time, and that more borings may be needed later when tM
scope is better defined and more detailed information becomes available. We, also understand
that thc Plum project may be added at a later date.
As per your rcqucst, the scope oftl~¢ project m~d our g¢otcclmical scrvices arc shown in thc table
bctow;
Project No. Project Description Geotechnical Scope
1 0a
Old Alvin, Broadway to Plum
(approximately 2,000 to 2,500 linear feet)
Widening cxisting asphalt pavement to 36
fcct to .'.,ccoinrnodate lclt turn lm'~e and add 6
foot asphalt shoul&rs Broadway to nm'th
side of Pkm't intersection.
Magnolia (fi.)) M'cI,eaa
Add left turn lanes on north, east and south
sides of intersection.
Three - 10 ft bodn~' ~ore
existing asphalt pavenlcnt,
provide recommcndatkms on
pavement desibm.
Two - 10 ft borings, cot',:
existing asphalt pavcment,
provide recommendations on
pavement design.
Fire (~) 1 Iafl~ey
Adding left turn lanes at four directions to
relieve congestion at school. Extend
intersection culverts as rcquired.
Two --] 0 fl borings-, Core.
existing asphalt pavement,
provide recommendations oa
pavement design.
Mr. Jim "'
I:tV$ Proposal No, 0 l-2 I SPGH-0 (R~viJcd January 18, 2002)
Project ~o. Project Description Geotechaical Scope
19
Wcst Ma, y s Creek Dctcntiort Pond
Mary's Creek at FM1128
One - 30 Ft boring with gn'ound
water observation,
recommendations for slope
stability of native soils.
The total number of borings wilt be eight (8); including seven 10-1:bet borings which will require
pavement coring and traffic control, and one 30-foot boring for the detention pond. We propose
to install a piczometer in the 30-foot boring, in order to detemfine stabilized groundwater
conditions for thc dcteution pond. Wc recommend that abandonment of thc picz0meter be
included in the contractor's scope of' work. The remaining borings will be backlillcd with
ccmcut-bcntonite grout aftcr obtaining groundwater levels during and on eompletiou of drilling.
We have assumed that the borcholc locations are accessible to truck-mounted drilling equipment.
All the field and laboratory tests will bc pcrf'ormed according to TxDOT and ASTM stan&u'ds,
whore applicable, or with other w'~II established procedures. Results of the field ami laboratory
data wilt bo used to develop rccommcadations for pavement and detention pond design and
c. onstrttction. In general, the following items will be included in the report:
1. Boring logs and test data
2. Groundwater conditions
3. Gcncralizcd subsUrface conditions
4. Pavement thickness design
5. Detention basin recommendations, including slope stability
6. Structural fill req,diremcnts and general earthwork recommendations
A report of our study will be prel.?ared by aa engineer specializing in soil mcchmics and
foundation engineering after rewewmg available structural, gee. logical, boring and laboratory
data. We expect to complete this assignment in approximat¢Iy s~x weeks, following our ~eceipt
olYyour written notice to proceed. Preliminary foundation design h~formation, if needed, will be
suhmittcd as it bccotncs available.
l,'ces and Conditions
Based on the scope of work outlined, the lump sum fcc for our services is $8,370. A cost
breakdown is presented in an enclosed table. Our accounting procedures call for the subrnittal of
invoices on a month-end basis or at the conclusions of project shoukt its duration last less than a
month. Our credit t¢mas are 30 days net.
Turm.:r Collie & [traden Inc. will be responsible for providing a site plan, with flcility locations
shown, suitable for use :ts a base map for our study. In addition, Turner Collie & Braden Inc.
will be responsible Ibr surveying the horizontal and vetlical locations of thc borings. We will
field locute the bodngs rclative to hcility locations shown on the plans provided by' Turner
Collie & Bt'aden
Insurance ce[tificatcs vcrit}¥ing HVJ Associates' gcneral liability, auto, worker competnsation,
and errors ami omissions insurance coverage, listing Turner Collie & Braden Inc. as a certificate
holder, will bc provided upon request.
· Mr, Jim Keller, P.E,
I-iVJ Proposal No. 01-215£GH-0 (Revised J'mmary i8, 2002)
Pt~.gc 3
If this proposal moots with your approval, pleas,: sign and cotnplete the indicated spaces below
and tbrward a copy o£th,2 proposal to us.
HVJ Associates, Inc. is pleased to bc of service on this project. Please call Ms. DidiNd~mdo if
y'ott have any qu~:stions or require additional intbrmation.
Sinccrcly,
l-lYJ ASSOCI~.~TES, INC.
Eli Zlotnik
Vice President / [louston Brm~ch Manager
EZ/DN:d~
Agrccct to ti'tis
By:
__day of
2O
Title:
Firn~:
Datt~ to Start Work:
GEO't'ECII.NI('.A L Es'riMA'I E
TC&i3. Ch¥ of £earland Roadway & Drainage In~l.~rovcmem's
I-tVJ f'ropozal No. 0 I-2ISFGF[-0 ~, Revised lammry I$, 2002)
G F, OTECH,'~[CAL INYESTIGAT[ON BREAKDOVYN
Mob, iii zatio~JDcmobilizatien
Soil Borh~g
t.o~ging-
Slaking & Utility Clearance- Sr. Technician
Piezumctcr Installation
Boruhol~ Grouting
P;~ vemcn
Traffic Cvntroi Allowa~xc,
S{;lll(~[lld Labor:ttot~ Testing
Scnlor Engineer, P.E.
Project Matmgcr~ngincer, P.E.
S taft
Clerk/Typist - SuFport
CADD Operator
~ @ $300.00 L.S.
100 ft~ $17.50 per foot
15 hr ~. $35.00 per hour
6 hr ,~ $50.00 per Imur
30 t't ~ $12.50 per foot
70 ft @ $4.50 each
7 ~ $120.00 eacl~
I0 hr @ $30.00 per hour
100 tt ~ $9.00 per loot
5.5 hrS. $I05.00 per hour
5.5 hr (~ $$$.00 per hour
23 hr ~ $60.00 perlxour
2 hr @ $35.00 per liour
5 hr Q~, $54.00 pcr hour
TOTAL
$300.00
$1.750.00
$525.00
$300.00
$375.00
$3 ! 5.00
$840.00
$300.00
Sg00.00
$577.50
$467.50
$ 1,350.00
$70.00
$27(1.00
$8,370,00
CITY OF PEARLAND
MOBILITY & DRAINAGE PROGRAM
Miscelllaneous Road Improvement Projects Group 1
ID
1
10
11
12
13
14
15
16
17
Task Name
N otice to Proceed
P rogram Administration
Procedures & Design Criteria
Program Start•Up
Define Scope of Each Project
Preliminary Cost Estimates
Prioritize Projects
Group 1 Projects
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Preliminary Engineering Services
Data Collection
Field Reconnaissance
Authorization-Survey,Geotech, Drainage & ESA
Survey
ROW Mapping
Geotech Studies
Drainage Studies
Preliminary Design
Review City of Pearland
Final Design
Design 30%
Review 30% Design
Design 60%
Review 60%
Design 90%
Review 90%
Complete Bid Documents
Advertise, Bid & Award
Advertise Bid
Pre Bid Conference
Receive Bids
Recommend Award
Award Construction Contract
Construction Phase
Notice to Proceed
Construction
Duration
0 days
28 days
28 days
28 days
7 days
15 days
6 days
248 days
87 days
7 days
7 days
O days
18 days
26 days
33 days
21 days
14 days
7 days
48 days
14 days
7 days
12 days
7 days
10 days
6 days
6 days
23 days
0 days
O days
0 days
O days
1 day
90 days
1 day
85 days
Start
Tue 12/11/01
Finish
Tue 12/11/01
Predecessors
Tue 12/11/01 Mon 01/07/02 1
Tue 12/11/01 Mon 01/07/02 1
Tue 12/11/01 Mon 01/07/02 1
Tue 12/11/01 Mon 12/17/01 1
Tue 12/18/01 Tue 01/01/02 5
Wed 01/02/02
Mon 01/07/02 6
Tue 12/11/01 Thu 08/15/02
Tue 12/11/01 Thu 03/07/02
Tue 12/11/01 Mon 12/17/01 1
Tue 12/11/01 Mon 12/17/01 1
Mon 01/28/02 Mon 01/28/02
Mon 01/28/02 Thu 02/14/02 12
Mon 01/28/02
-
Mon 01/28/02
Mon 01/28/02
Fri 02/22/02
Fri 034/01/02
12
12
Sun 02/17/02 12
Fri 02/15/02 Thu 02/28/02 13
Fri 03/01/02 Thu 03/07/02
Fri 03/08/02
Wed 04/24/02
17
Fri 03/08/02 Thu 03/21/02 18
Fri 03/22/02 Thu 03/28/02
Fri 03/22/02 Tue 04/02/02
20
20
Wed 04/03/02 Tue 04/09/02 ! 22
Wed 04/03/02 , Fri 04/12/02 22
Sat 04/13/02
Fri 04/19/02
Wed 04/24/02
Wed 04/24/02
Wed 05/08/02
Tue 05/14/02
Thu 05/16/02
Fri 05/17/02
Thu 04/18/02 24
Wed 04/24/02 25
Fri 05/17/02
Wed 04/24/02 26
Wed 05/08/02 28FS+14 days
Tue 05/14/02 28FS+20 days
Thu 05/16/02 30FS+2 days
Fri 05/17/02 31
Sat 05/18/02 : Thu 08/15/02
Sat 05/18/02 Sat 05/18/02 ` 32
Thu 05/23/02 Thu 08/15/02 34FS+4 days
ber
12/09 12/16
♦-12/11
pp I
12/23
January
12/30 01/06
Jji
•
Februa
01/13 01/20101/27
March
02/03 02/ 10 i02/ 17 b2/24
.-01/28
03/03 03/10
03/17
03/24
April
03/31 04/07
04/14104/21
Ma
June
04/28105/05 jC5/12,05/ 19105/26;06/021O6/09106/ 16
5/08
a05/14
4.-05/16
06/23
July
06/30
07/07
1 August
07/14107/21;07/28 08/04 08/
1
Turner Collie & Braden Inc.
Project:13-11256
Date: Mon 01/21/02
Task
Split
..............
Progress
Milestone
Summary
Rolled Up Task
Rolled Up Split Rolled Up Progress
Rolled Up Milestone O External Tasks
Project Summary
ATTACHMENT D
WORK AUTHORIZATION NO. 4
Exhibit "A"
R20024 2 of 2
This Work Authorization is made pursuant to the terms and conditions of the Pearland
Mobility & Drainage Bond Program, hereinafter identified as the "Contract", entered into
by and between the City of Pearland ("City"), and Turner Collie & Braden Inc.
("Engineer).
PART 1. Work Authorization No. 4 is related to The Corrigan Subdivision Drainage
Improvement Project. The Engineer will perform Hydrology and Hydraulic Analysis,
PART 2. The maximum amount payable for services under this Work Authorization is
$68,000. This amount is based on the attached fee proposal submitted by LJA
Engineering and Surveying, Inc. dated January 9, 2002.
PART 3. Payment to the Engineer for the services established under this Work
Authorization shall be "Lump Sum".
PART 4. This Work Authorization shall become effective on January 28, 2002 and shall
terminate on November 12, 2005, unless extended by a supplemental work authorization.
PART 5. This Work Authorization does not waive the parties' responsibilities and
obligations provided under the contract.
PART 6. This Work Authorization is hereby accepted and acknowledged below.
ENGINEER
By:
Larry F. Janak, P.E.
Typed or Printed Name
Senior Vice President
Title
Date
LIST OF EXHIBITS
Exhibit A — Fee Schedule
Exhibit B — Work Schedule
By:
CITY OF PEARLAND
•
Typed or Pnnted Name
itle
Date
Turner Collie Braden Inc.
01/16/2002
EXHIBIT A
FEE SCHEDULE
Pearland Mobility & Drainage Bond Program
Work Authorization No. 4
Project
Corrigan Subdivision Drainage Improvements
Engineering Services
Hydrologic & Hydraulic
Environmental Compliance
Topographic Survey
Geotech
ROW Maps & Documents
PS&E
Basic Services
Traffic Control
SWPPP
Direct Cost
ROW Acquisition Assistance
Materials Testing
Subtotal
Total to Date
Summary
LJA Engineering & Surveying
Previous
Authorization
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Current
Authorization
$68,000.00
$68,000.00
$68,000.00
Page 1 of 1
"Engineer's Copy"
LJA Engineering & Surveying, Inc.
2929 8narpark Drive Phone 713.953,5200
Suite 600 Fax 713.953.5026
Houston, Texas 77042-3703 www.ljaengineering.com
January 9, 2002 PROPOSAL
Mr. Jarnes W. Keller, P.E.
Turner, Collie & Braden, Inc
P.O. Box 130089
5757 Woodway
Houston, Texas 77057-1599
Re: Engineering Proposal for Hydrology and Hydraulic Analysis
Of Corrigan Subdivision Pearland, Texas
LJA Proposal No 02-013
Dear Mr. Keller:
We are pleased to submit the following Scope of Services for a Hydrology and Hydraulic Analysis
of Corrigan Subdivision. It is our understanding that LJA will be providing these engineering
services and, as the Program Manager for the City of Pearland, Texas, Turner Collie & Braden is
negotiating a contract with our firm. A proposed Scope of Work is enclosed as Attachment A.
The following fees, corresponding to Attachment A are proposed in accordance with the attached
Professional Services Agreement (PSA).
COMPENSATION
The compensation for the items of work proposed in the Scope of Services will be on a lump sum
basis in accordance with the attached PSA. The estimated fees are as follows:
Description Fee
Coordination and Meetings
Data Collection
Existing Condition Analysis
Preliminary Impact Analysis
Final Impact Analysis
$7,500.00
$8,500.00
$18,000.00
$21,500.00
$12,500.00
Any additional tasks specifically requested by Turner Collie & Braden that do not fall under the
services described above will be provided on a time and material basis. These additional services
shall be approved in writing prior to commencement.
a"0
Mr. James W Keller, P.E.
January 9, 2002
Page 2
TERMS OF PAYMENT
Payment for the above mentioned services will be made on a monthly basis by Turner Collie &
Braden based on the schedule in the attached PSA.
If this proposal meets with your approval, please execute both copies, returning one copy to our
office, and keeping the other for your records.
Sincerely,
n
i
Carolyn S gWigan, P.E
Manager, Hydrology and Hydraulics
CSG/rca
Attachment
O:\PROPOSAL0002\Turner Collie & Braden \02-013pro.doc
ouI uap2J8 alp1Diawn1
FA - Future Appropriation
0
r
EA
1
1
-4
V
y
-a
EA
03
0
0
N
En
w
0
0
429
co
W
V
0
< <
d
o o
c
7
o N
a 5
o
•
0 0
n 0
N
c
K
Pearland Parkway (PE & EA)
TaaJ1g eiiou6ew
0
cn
co
a
Pearland Parkway Phase II
D D Ti D D D D D
D D D D D D D D
West Mary's Creek Detention
CO
cp
Corrrigan Improvements
uo!sua;x3 uapn3
Eft En
cn ()1
E 1
W CO
a co
En CA En
CO
s N 0
03
peoa Jel!OP(lie8
EA
D)
W
Co
0
En GI
N0)
Co o D D
0 0
Eft
cD
W
co
in
0)
0
0
D D D D D D D D D D D D D D
D D D D D D D D D D D D
TI m '11 TI 'Ti "71 71 71 71 71 T 71
D D D ➢ D ➢ ➢ D D ➢ D D
N
n)
0
cn
c g
3 0
O, R'
DI
'a m
'a g
o m
✓ tam
ai W
O
O o
3 a
0
0
(0
G)
3
8 IN3WH3V11tt
ID 0
1
2
3
L
4
5
6
7
ras
8
9
10
11
12
13
14
15
16
17
Task Name
Corrigan Storm Sewers
Preliminary Engineering Services
Data Collection
Field Reconnaissance
Authorization H & H
Prep of Contracts
Drainage Studies
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
L
Authorization ESA
Prep of Contracts
Phase I ESA
Authorization -Survey & Geotech
Prep of Contracts
Survey
ROW Mapping
Geotech Studies
Preliminary Design
Review City of Pearland
Final Design
Duration
925 days
284 days
28 days
28 days
O days
8 days
100 days
0 days'
Start
Tue 12/11/01
Tue 12/11/01
Tue 12/11/01
Tue 12/11/01
Mon 01/28/02
Mon 01/28/02
Tue 02/05/02
Mon 04/08/02
15 days Mon 04/08/02
50 days Tue 04/23/02
0 days Mon 06/10/02
10 days Mon 06/10/02
75 days
30 days
65 days
270 days
Authorization
Prep of Contracts
ROW Acquisition
Design 30%
Review 30% Design
Design 60%
Review 60%
Design 90%
Review 90%
Complete Bid Documents
Advertize,8ld & Award
Advertize Bid
Pre Bid Confrence
Receive Bids
Recommend Award
Award Construction Contract
Construction Phase
Notice to Proceed
14 days
330 days
0 days
15 days
100 days
60 days
14 days
44 days
Thu 06/20/02
Thu 06/20/02
Thu 06/20/02
Tue 12/11/01
Sat 09/07/02
Mon 06/10/02
Mon 06/10/02
Mon 06/10/02
Sat 09/21/02
Sat 09/21/02
Wed 11/20/02
Wed 12/04/02
Finish
Tue 06/22/04
Fri 09/20/02
Mon 01/07/02
Mon 01/07/02
Mon 01/28/02
Mon 02/04/02
Wed 05/15/02
Mon 04/08/02
Mon 04/22/02
Tue 06/11/02
Mon 06/10/0-2
Wed 06/19/02
Mon 09/02/02
Fri 07/19/02
Fri 08/23/02
Fri 09/06/02
Fri 09/2-0/02
Mon 05/05/03
Mon 06/10/02
Mon 06/24/02
Sun 12/29/02
Tue 11/19/02
Tue 12/03/02
Thu 01/16/03
14 days Fri 01/17/03 Thu 01/30/03
60 days Fri 01/31/03 Mon 03/31/03
14 days
21 days
42 days
O days
0 days
0 days
0 days
0 days
365 days
0 days
Construction 365 days
Tue 04/01/03
Tue 04/15/03
Mon 05/05/03
Mon 05/05/03
Mon 05/26/03
Mon 06/02/03
Mon 06/09/03
Mon 06/16/03
Mon 06/23/03
Mon 06/23/03
Tue 06/24/03
Mon 04/14/03
Mon 05/05/03
Mon 06/16/03
Mon 05/05/03
Mon 05/26/03
Mon 06/02/03
Mon 06/09/03
Mon 06/16/03
Tue 06/22/04
Mon 06/23/03
Tue 06/22/04
Dec
2002
ji
CITY OF PEARLAND
MOBILITY & DRAINAGE PROGRAM
CORRIGAN DRAINAGE PROJECT
Jan
Feb
Mar
Apr
04/08
May
Jun
40O6/10
Jul I Aug I Sep
Turner Collie & Braden
Project: 13-11256
Date: Thu 01/17/02
Task
Split
Progress
Milestone
•
•
Summary
Rolled Up Task
Oct
Nov
2003
Dec
Jan
iji
.....
Feb
Apr f'
Jun
05/26
6/02
O6/09
�06/16
Rolled Up Split
Roiled Up Milestone O
Jul
06/23
Oct
Nov
2004
Dec
Jan
Feb
Mar
Apr
May
Jun
Rolled Up Progress
External Tasks
Project Summary relliallg
Page 1