R2002-0018 01-28-02 RESOLUTION NO. R2002-18 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING WORK AUTHORIZATIONS FOR ENGINEERING SERVICES ASSOCIATED WITH THE PEARLAND MOBILITY AND DRAINAGE BOND PROGRAM. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and Turner, Collie and Braden, Inc., ("T C & B)for Program Management of the Pearland Mobility and Drainage Bond Program was authorized by the City Council on December 10, 2001. Section 2. That T C & B has developed work authorizations, which are attached hereto as Exhibits "A" and "B" respectively. Section 3. That the work authorizations for engineering services associated with the Pearland Mobility and Drainage Bond Program are hereby approved. PASSED, APPROVED and ADOPTED this the 28 dayof ,January , A.D., 2002. ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR ATTACHMENT D WORK AUTHORIZATION NO. 2 Exhibit "A" R2002-18 1 of 2 This Work Authorization is made pursuant to the terms and conditions of the Pearland _Mobility'& Drainage Bond Program, hereinafter identified as the "Contract", entered into by and between the City of Pearland ("City"), and Tumer Collie & Braden Inc. ("Engineer). PART 1. Work Authorization No. 2 is related to Miscellaneous Road Improvement Projects, Group 1 including; Old Alvin - Broadway to Plum, the Magnolia and McLean intersection and the Fite and Harkey intersection. The Engineer will perform Topographic Survey services and Geotechnical Investigation under this Authorization. PART 2. The maximum amount payable for services under this Work Authorization is $127,733.35. This amount is based on the following: See attached fee proposals submitted by: TSC Engineering for Survey dated January 17, 2002 in the amount of $31,200.00; TSC Engineering for Basic Design Services, Drainage Report, Traffic Control and SWPPP in the amount of $ 88,163.35 and HVJ Associates, Inc. for Geotechnical dated January 18, 2001 in the amount of $8,370.00 for a total of $127,733.35. PART 3. Payment to the Engineer for the services established under this Work Authorization shall be "Lump Sum". PART 4. This Work Authorization shall become effective on January 28, 2002 and shall terminate on November 12, 2005, unless extended by a supplemental work authorization. PART 5. This Work Authorization does not waive the parties' responsibilities and obligations provided under the contract. PART 6. This Work Authorization is hereby accepted and acknowledged below. ENG~FffR ~' ~,,/~_./O'C..,/- By: By: CITY OF PEARLAND Larry F. Janak, P.E. Typed or Printed Name Typed or Printed Name Senior Vice President Title LIST OF EXHIBITS Exhibit A - Fee Schedule Exhibit B - Work Schedule Date Date Turner Collie Braden Inc. EXHIBIT A FEE SCHEDULE Pearland Mobility & Drainage Bond Program Work Authorization No. 2 Summary 0112112002 project Miscellaneous Road Improvements Group 1 Old Alvin - Broadway to Plum Magnolia at McLean Intersection Fire at Harkey Intersection Etlgil~eering Services Hydrologic & Hydraulic Environmental Compliance Topographic Survey Geotech ROW Maps & Documents PS&E Traffic Control SWPPP Direct Costs ROW Acquisition Assistance Materials Testing Subtotal TSC Engineering Company TSC Engineering Company HVJ Associates, Inc TSC Engineering Company TSC Engineering Company TSC Engineering Company TSC Engineering Company Previous Authorization 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Current Authorization $ 7,950.86 $ 31,200.00 $ 8,370.00 $59,949.47 $13,974.31 $4,538.72 $1,75O.OO $127,733.36 Page 1 of 1 5C Surveying Company ~,250 t,%stpark Drive Suite 210 Houston, Texas 77057-7304 713.7S4.440,6 Fa.'< 713.784.0900 surveytr~g.~orbitworM.net January 17, 2002 Turner Collie & Braden Inc. 5757 Woodway Houston, Texas 77057 Office: 713.780.4100 Fax: 713.780.0838 Attn: Mr. James W. Keller, P.E. Senior Project Manager Re: Cost Proposal for Professional Surveying Services and Cadd Services for the four following project: Project No. 2 (Old Alvin - Broadway to Plum), Project No.6 (Magnolia at McLean) and Project 10a (Fite at Harkey). Dear Mr. Keller, TSC Surveying Company (TSC) is pleased to submit the following cost proposal for the captioned project. Project Limits: Project No. 2, Old Alvin - Broadway to Plum Project: Widening, adding shoulder and left mm lanes. Topographic survey from center line of Broadway to 300 feet north of Plum, 400 feet west of Old Alvin on Plum, 400 feet east of Old Alvin on Elum, full width of Right-of-Way. Project No. 6, Magnolia at McLean Project: Adding left tum lanes on north, east and south sides of intersection. Topographic survey 400 feet; north, south and east of intersection, and 100 feet west of intersection, full width of Right-of-Way. Project 10a, Fite at Harkey Project: Adding left turn lanes at four directions to relieve congestion at school. Topographic survey from center line ofh~tersection 800 feet north, 400 feet east, 400 feet south and 700 feet west, full width of Right-of-Way. H:\INVOICES\SP0 I\SP013 lrl.DOC Page 1 of 4 T$C Surveying Company Scope of Services & Compensation A. Establish Project Vertical Control 1. Recover existing Monuments with elevation datum and verify accuracy of the published elevations. 2. Establish new benchmarks as required to establish vertical control at intervals not to exceed 1000-feet along the proposed alignment. 3. Establish a horizontal position on all recovered and new benchmarks for future recovery. B. Establish Project Horizontal Control Horizomal Control will be based upon the Texas State Plane coordinate System, South Central Zone, NAD 83. All the coordinates will be Texas State Plane Grid with the Surface conversion to be provided for future use. 2. Recover existing Monuments with horizontal datum and verify the accuracy of the published coordinates. 3. Establish new project horizontal control points along the alignment at intervals not to exceed 1000-feet. C. Stake Proposed Alignment The project baseline will be coincidental with, or parallel to, the stationed "Design Cemer Line." Base line control points will be established using 5/8" iron rods, 36" long, at PCs, Pis and PTs of horizontal curves and at 1000' maximum intervals on tangents. This cemerline staking will be maintained through completion of design and awarding of the construction contract. 2. The location of all soil core drill holes will be staked as determined by the Engineer. D. Topographic Surveying Determine adjoining property owners from city and county records and compile a list of owners. Obtain Right-of-Entry Letters from the adjoining property owners to conduct topographic surveys. H:\INVOICES\SP01\SP013 Itl.DOC Page 2 of 4 TSC Surveying Company Locate visible major topographic features to include, but not limited to, curb lines, gutters, driveways, ditch lines, structures, major vegetation, signs, contour break lines, sidewalks, fences, traffic signals, street lights, railroad tracks, parking lots, mailboxes, buildings and other fixed features. 3. Topographic features will be obtained 50 feet beyond the existing right of way for existing facilities. Locate visible major utilities (i.e. power poles, manholes, pull boxes, pipeline markers, fiber optic markers, etc.) and other utility features that may affect the project. The direction and type of overhead wires shall be noted. Locate all manholes, handholds and valves within the project. All manholes shall be opened and size, direction and rim and flow elevations shall be noted. The utility owners shall be contacted and the location, type and depth of the facilities shall be determined in profile, along the proposed alignment. The underground profile shall include storm sewer, sanitary' sewer, water, electric, telephone, fiber optic, gas and other utility found within the project limits. 7. The location, size, flow line anddirection of all cross drainage structures shall be recorded. 8. Profile existing drainage facilities. 9. Establish elevations at all tied topographic features. E. Right-of-Way Survey 1. Recover and verify existing Right-of-Way comers of the portion of the dedicated parcels. F. Preparation of Graphic Files 1. Prepare 2D CADD electronic file of planimetrics at the horizontal scale of 1"=40'. 2. Prepare 3D CADD electronic file of the project. Perform CADD electronic file of the profile along the base line to include all under ground utilities at a horizontal scale of 1"=20' and a vertical scale of 1 "=2'. H:~INVOICES\SP0I\SP0131r 1.DOC Page 3 of 4 TSC Surveying Company G. Deliverables Topographic Survey 1. 2D Graphic files o£ the plan view at 1"=40' depicting the field data, control points (vertical and horizontal), Right-of-Way, property lines, and the base line alignment. 2. Graphic file o£ the profile view at a horizontal scale o£ 1"=20' and a vertical scale of 1"=2', including all underground utilities. 3. Hard copy o£the plan view. 4. 3D Graphic file of the project including all features voids and break lines. 5. ASCII point data file in electronic format with printout. 6. Copies of field notes. 7. Property owners' list and copy of signed Right-of-Entry Letters. We propose to do the work described in the Scope of Services, based on a lump sum fee, without further modifications is $31,200.00. Submission Schedule & Deliverables TSC recognizes the urgency of this project and proposes to begin work within two (2) working days after receipt of written notice to proceed and will complete the work within eighteen (18) calendar days. We appreciate this oppOrtunity and look forward in working with you again. If you have any questions, please call. Sincerely~ / ./'/:- ,/ Chuck Dawkin, R.P.L.S. Senior Project Manager cc: Proposal H:\INVOICES\SP01\SP0131ri.DOC Page 4 of 4 January l7,2002 Mt. James R. Keller, P.E. Tumer, Collie & Braden P.O. Box 130089 Houston, Texas77219 Re: Pearland Intersection Improvements (Revised) TCB Job No. 13-11256 Dear Nh-. Keller: It is with great pleasure that TSC Engineering Company submits this cost proposal for the design of roadway capacity projects in the City of Pearland. These projects were described in package of information provided by TCB to TSC Engineering Company on December 19, 2001 and include: Project No. 2 Old Alvin - Broadway to Plum This project will widen the existing asphalt pavement to 36 feet to accommodate a left mm lane and add 6 foot asphalt shoulders Broadway to north side of the Plum Intersection. This project will include the reconstruction of the Plum Old Alvin intersection with left turn lanes utilizing concrete pavement. This project is approximately 2,400 feet in length. Project No. 6 Magnolia at McLean Intersection This project will add left turn lanes on north, east and south sides of intersection, typically the turn lanes are 200 feet long with a I00 foot transition. Project 10a Fite @ Harkey This project will add left turn lanes on all four legs of the intersection to relieve congestion at the nearby school, culverts will be extended as necessary. The improvements will extend 600 feet to the north and west and 300 feet to the south and east. The scope of work will include the preparation of construction plans, specifications, and estimates for the three projects noted above. This includes the preparation of a letter report on the drainage to cover each location, it does not include the preparation of a detailed impact study or channel analysis. This scope of work does not include the preparation of public or private utility relocation drawings, the preparation of traffic signals or traffic studies of any type. The total lump sum cost will be $88,163.35 as detailed in the attachment. This estimate includes limited construction phase services to include review of shop drawings, attending a prebid meeting and a preconstruction meeting and responding to requests for information from the contractor referred to us through Turner, Collie & Braden. flout;ton: 6250 Westpark Drive, Suite 2130 * [-[ouston, Texas 77057-7334 · 713.7S4.7777 · Fax 7[3 784.7733 Amarillo: 905 S. Fillmore, Suite 62(I o Amarillo, Texas 7910t-3541 · 80o.372.$700 · Fax g136.372.876'; Mr. James W. Keller, P.E. January 17, 2002 Page 2 TSC Engineering Company does not foresee a problem with providing construction bid documents by April 24, 2002 to meet the letting date proposed. This is based on TSC's production capability and any extended or untimely reviews or review comments could jeopardize the completion date. ff you need further clarification or additional information, don't hesitate to contact me. Sincerely, i-,... ! i ~:~ Brad White, P.E. Senior Project Manager Attachment Xc: Contract File Fee Schedule (Labor Cost) TSC Engineering Company PenTland Intersection improvements Basic Engineering Fee Clussification Project Manage. Senior Engineer Design Engineer Engineer Assistant Tech/CADD Operator Administrative Asstnt. TralHc Control Classification Project Manage' Senior Engineer Design Engineer Engineer Assistant Tech/CADD Operator Administrative Asstnt. Draioage Report Classification Project lVlanager Design Engineer Engi neet Assistant Admimstrafive Asstnt. SWPPP Classifiattion Project Manager Senior Engineer Design Enginee' Engineer Assistant TechtCADD Operator Administrative Asstnt. Ma. nhottrs/ Crew hours Rttte Cost 90 $ t 36.60 $12 29'*.36 80 $103.87 58,309.3 I 155 $94.72 514.681.60 125 $87.32 $10,915.00 170 $76.96 $13,083.20 15 $44.40 $666.00 635 $59,949.47 Prepare Traffic Control Plan for the construction of the four projects described in the scope of work. lffanhours/ Crew hours Rate 18 15 32 20 65 4 154 Cost $136.60 $2,4.58.87 $103.87 $1,558.00 $94.72 $3,031.04 $87.32 $ 1,746.40 $76.96 $5,002.40 $44.40 $177.60 $13,974.31 Letter report describing how project will drain with storm sewer calculations Manhou rs/ Crew hours Rate Cost 14 $136.60 $1,912.46 20 $94.72 $1.894.40 40 $94.72 $3,788.80 8 $44.40 $355.20 82 $7,950.86 Prepare Stro[nwater Pollution Prevention Plan for four projects described in scope Munhour.Ot Crew hottrs Rate 6 5 12 ~0 12 6 51 Cost $136.60 $819.62 $103.87 $519.33 $94.72 $1,136.64 $87.32 $873.20 $76.96 $923.52 $44.40 $266.4O $4,538.72 Summary Basic Services Traffic Control Drainage Letter Report SWPPP Direct Costs(Printing. Mileage..) I Total I Hours T$C [ Engineehng Base(Raw) 635 $59.949.47 154 $13,974.31 82 $7,950.86 51 $4,538.72 $t.750.00 922 $88,163.35 (Labor Cost) Page I of I (1117/O2) (:~ootectnn~cal, Environmental & Materials Engineers December 21,2001 6120 S. L~a;ryA~bford Read i'feus:rjn, Yex2~ 77072 (,.8 l/923 (28!) 933-7293 ,~ax h'Jp://www hvi.com Mr. Jim Keller, P.E. 'l'umer Collic& Bradcn Inc. 5757 Woodwa7 l Iot.tslou, 'i'cxas 77057-1599 (kotechnical Stt:dy City of Pentland Mobility and Drainage Program Owner: City of Pentland IIVJ Proposal No. 01-218PGH-0 (Revised January 18, 2002) Dear Mr." ' · Keller: In response to your request, HVJ Associates, Inc. is pleased to sub,nit this revised fcc proposal t~r.p.rovi.ding a gcotcchn£cal study for the City of Pentland Mobility and Drainage Program. The rcvmon ~s due to the removal of the Plum project from Old A. Ivin to Schleider and one additional bori,g for thc etd Alvin Foject from Broadway to Plum. Wc understand that the scope of thc proposed projects is preliminary at this time, and that more borings may be needed later when tM scope is better defined and more detailed information becomes available. We, also understand that thc Plum project may be added at a later date. As per your rcqucst, the scope oftl~¢ project m~d our g¢otcclmical scrvices arc shown in thc table bctow; Project No. Project Description Geotechnical Scope 1 0a Old Alvin, Broadway to Plum (approximately 2,000 to 2,500 linear feet) Widening cxisting asphalt pavement to 36 fcct to .'.,ccoinrnodate lclt turn lm'~e and add 6 foot asphalt shoul&rs Broadway to nm'th side of Pkm't intersection. Magnolia (fi.)) M'cI,eaa Add left turn lanes on north, east and south sides of intersection. Three - 10 ft bodn~' ~ore existing asphalt pavenlcnt, provide recommcndatkms on pavement desibm. Two - 10 ft borings, cot',: existing asphalt pavcment, provide recommendations on pavement design. Fire (~) 1 Iafl~ey Adding left turn lanes at four directions to relieve congestion at school. Extend intersection culverts as rcquired. Two --] 0 fl borings-, Core. existing asphalt pavement, provide recommendations oa pavement design. Mr. Jim "' I:tV$ Proposal No, 0 l-2 I SPGH-0 (R~viJcd January 18, 2002) Project ~o. Project Description Geotechaical Scope 19 Wcst Ma, y s Creek Dctcntiort Pond Mary's Creek at FM1128 One - 30 Ft boring with gn'ound water observation, recommendations for slope stability of native soils. The total number of borings wilt be eight (8); including seven 10-1:bet borings which will require pavement coring and traffic control, and one 30-foot boring for the detention pond. We propose to install a piczometer in the 30-foot boring, in order to detemfine stabilized groundwater conditions for thc dcteution pond. Wc recommend that abandonment of thc picz0meter be included in the contractor's scope of' work. The remaining borings will be backlillcd with ccmcut-bcntonite grout aftcr obtaining groundwater levels during and on eompletiou of drilling. We have assumed that the borcholc locations are accessible to truck-mounted drilling equipment. All the field and laboratory tests will bc pcrf'ormed according to TxDOT and ASTM stan&u'ds, whore applicable, or with other w'~II established procedures. Results of the field ami laboratory data wilt bo used to develop rccommcadations for pavement and detention pond design and c. onstrttction. In general, the following items will be included in the report: 1. Boring logs and test data 2. Groundwater conditions 3. Gcncralizcd subsUrface conditions 4. Pavement thickness design 5. Detention basin recommendations, including slope stability 6. Structural fill req,diremcnts and general earthwork recommendations A report of our study will be prel.?ared by aa engineer specializing in soil mcchmics and foundation engineering after rewewmg available structural, gee. logical, boring and laboratory data. We expect to complete this assignment in approximat¢Iy s~x weeks, following our ~eceipt olYyour written notice to proceed. Preliminary foundation design h~formation, if needed, will be suhmittcd as it bccotncs available. l,'ces and Conditions Based on the scope of work outlined, the lump sum fcc for our services is $8,370. A cost breakdown is presented in an enclosed table. Our accounting procedures call for the subrnittal of invoices on a month-end basis or at the conclusions of project shoukt its duration last less than a month. Our credit t¢mas are 30 days net. Turm.:r Collie & [traden Inc. will be responsible for providing a site plan, with flcility locations shown, suitable for use :ts a base map for our study. In addition, Turner Collie & Braden Inc. will be responsible Ibr surveying the horizontal and vetlical locations of thc borings. We will field locute the bodngs rclative to hcility locations shown on the plans provided by' Turner Collie & Bt'aden Insurance ce[tificatcs vcrit}¥ing HVJ Associates' gcneral liability, auto, worker competnsation, and errors ami omissions insurance coverage, listing Turner Collie & Braden Inc. as a certificate holder, will bc provided upon request. · Mr, Jim Keller, P.E, I-iVJ Proposal No. 01-215£GH-0 (Revised J'mmary i8, 2002) Pt~.gc 3 If this proposal moots with your approval, pleas,: sign and cotnplete the indicated spaces below and tbrward a copy o£th,2 proposal to us. HVJ Associates, Inc. is pleased to bc of service on this project. Please call Ms. DidiNd~mdo if y'ott have any qu~:stions or require additional intbrmation. Sinccrcly, l-lYJ ASSOCI~.~TES, INC. Eli Zlotnik Vice President / [louston Brm~ch Manager EZ/DN:d~ Agrccct to ti'tis By: __day of 2O Title: Firn~: Datt~ to Start Work: GEO't'ECII.NI('.A L Es'riMA'I E TC&i3. Ch¥ of £earland Roadway & Drainage In~l.~rovcmem's I-tVJ f'ropozal No. 0 I-2ISFGF[-0 ~, Revised lammry I$, 2002) G F, OTECH,'~[CAL INYESTIGAT[ON BREAKDOVYN Mob, iii zatio~JDcmobilizatien Soil Borh~g t.o~ging- Slaking & Utility Clearance- Sr. Technician Piezumctcr Installation Boruhol~ Grouting P;~ vemcn Traffic Cvntroi Allowa~xc, S{;lll(~[lld Labor:ttot~ Testing Scnlor Engineer, P.E. Project Matmgcr~ngincer, P.E. S taft Clerk/Typist - SuFport CADD Operator ~ @ $300.00 L.S. 100 ft~ $17.50 per foot 15 hr ~. $35.00 per hour 6 hr ,~ $50.00 per Imur 30 t't ~ $12.50 per foot 70 ft @ $4.50 each 7 ~ $120.00 eacl~ I0 hr @ $30.00 per hour 100 tt ~ $9.00 per loot 5.5 hrS. $I05.00 per hour 5.5 hr (~ $$$.00 per hour 23 hr ~ $60.00 perlxour 2 hr @ $35.00 per liour 5 hr Q~, $54.00 pcr hour TOTAL $300.00 $1.750.00 $525.00 $300.00 $375.00 $3 ! 5.00 $840.00 $300.00 Sg00.00 $577.50 $467.50 $ 1,350.00 $70.00 $27(1.00 $8,370,00 CITY OF PEARLAND MOBILITY & DRAINAGE PROGRAM Miscelllaneous Road Improvement Projects Group 1 ID 1 10 11 12 13 14 15 16 17 Task Name N otice to Proceed P rogram Administration Procedures & Design Criteria Program Start•Up Define Scope of Each Project Preliminary Cost Estimates Prioritize Projects Group 1 Projects 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Preliminary Engineering Services Data Collection Field Reconnaissance Authorization-Survey,Geotech, Drainage & ESA Survey ROW Mapping Geotech Studies Drainage Studies Preliminary Design Review City of Pearland Final Design Design 30% Review 30% Design Design 60% Review 60% Design 90% Review 90% Complete Bid Documents Advertise, Bid & Award Advertise Bid Pre Bid Conference Receive Bids Recommend Award Award Construction Contract Construction Phase Notice to Proceed Construction Duration 0 days 28 days 28 days 28 days 7 days 15 days 6 days 248 days 87 days 7 days 7 days O days 18 days 26 days 33 days 21 days 14 days 7 days 48 days 14 days 7 days 12 days 7 days 10 days 6 days 6 days 23 days 0 days O days 0 days O days 1 day 90 days 1 day 85 days Start Tue 12/11/01 Finish Tue 12/11/01 Predecessors Tue 12/11/01 Mon 01/07/02 1 Tue 12/11/01 Mon 01/07/02 1 Tue 12/11/01 Mon 01/07/02 1 Tue 12/11/01 Mon 12/17/01 1 Tue 12/18/01 Tue 01/01/02 5 Wed 01/02/02 Mon 01/07/02 6 Tue 12/11/01 Thu 08/15/02 Tue 12/11/01 Thu 03/07/02 Tue 12/11/01 Mon 12/17/01 1 Tue 12/11/01 Mon 12/17/01 1 Mon 01/28/02 Mon 01/28/02 Mon 01/28/02 Thu 02/14/02 12 Mon 01/28/02 - Mon 01/28/02 Mon 01/28/02 Fri 02/22/02 Fri 034/01/02 12 12 Sun 02/17/02 12 Fri 02/15/02 Thu 02/28/02 13 Fri 03/01/02 Thu 03/07/02 Fri 03/08/02 Wed 04/24/02 17 Fri 03/08/02 Thu 03/21/02 18 Fri 03/22/02 Thu 03/28/02 Fri 03/22/02 Tue 04/02/02 20 20 Wed 04/03/02 Tue 04/09/02 ! 22 Wed 04/03/02 , Fri 04/12/02 22 Sat 04/13/02 Fri 04/19/02 Wed 04/24/02 Wed 04/24/02 Wed 05/08/02 Tue 05/14/02 Thu 05/16/02 Fri 05/17/02 Thu 04/18/02 24 Wed 04/24/02 25 Fri 05/17/02 Wed 04/24/02 26 Wed 05/08/02 28FS+14 days Tue 05/14/02 28FS+20 days Thu 05/16/02 30FS+2 days Fri 05/17/02 31 Sat 05/18/02 : Thu 08/15/02 Sat 05/18/02 Sat 05/18/02 ` 32 Thu 05/23/02 Thu 08/15/02 34FS+4 days ber 12/09 12/16 ♦-12/11 pp I 12/23 January 12/30 01/06 Jji • Februa 01/13 01/20101/27 March 02/03 02/ 10 i02/ 17 b2/24 .-01/28 03/03 03/10 03/17 03/24 April 03/31 04/07 04/14104/21 Ma June 04/28105/05 jC5/12,05/ 19105/26;06/021O6/09106/ 16 5/08 a05/14 4.-05/16 06/23 July 06/30 07/07 1 August 07/14107/21;07/28 08/04 08/ 1 Turner Collie & Braden Inc. Project:13-11256 Date: Mon 01/21/02 Task Split .............. Progress Milestone Summary Rolled Up Task Rolled Up Split Rolled Up Progress Rolled Up Milestone O External Tasks Project Summary ATTACHMENT D WORK AUTHORIZATION NO. 4 Exhibit "A" R20024 2 of 2 This Work Authorization is made pursuant to the terms and conditions of the Pearland Mobility & Drainage Bond Program, hereinafter identified as the "Contract", entered into by and between the City of Pearland ("City"), and Turner Collie & Braden Inc. ("Engineer). PART 1. Work Authorization No. 4 is related to The Corrigan Subdivision Drainage Improvement Project. The Engineer will perform Hydrology and Hydraulic Analysis, PART 2. The maximum amount payable for services under this Work Authorization is $68,000. This amount is based on the attached fee proposal submitted by LJA Engineering and Surveying, Inc. dated January 9, 2002. PART 3. Payment to the Engineer for the services established under this Work Authorization shall be "Lump Sum". PART 4. This Work Authorization shall become effective on January 28, 2002 and shall terminate on November 12, 2005, unless extended by a supplemental work authorization. PART 5. This Work Authorization does not waive the parties' responsibilities and obligations provided under the contract. PART 6. This Work Authorization is hereby accepted and acknowledged below. ENGINEER By: Larry F. Janak, P.E. Typed or Printed Name Senior Vice President Title Date LIST OF EXHIBITS Exhibit A — Fee Schedule Exhibit B — Work Schedule By: CITY OF PEARLAND • Typed or Pnnted Name itle Date Turner Collie Braden Inc. 01/16/2002 EXHIBIT A FEE SCHEDULE Pearland Mobility & Drainage Bond Program Work Authorization No. 4 Project Corrigan Subdivision Drainage Improvements Engineering Services Hydrologic & Hydraulic Environmental Compliance Topographic Survey Geotech ROW Maps & Documents PS&E Basic Services Traffic Control SWPPP Direct Cost ROW Acquisition Assistance Materials Testing Subtotal Total to Date Summary LJA Engineering & Surveying Previous Authorization $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Current Authorization $68,000.00 $68,000.00 $68,000.00 Page 1 of 1 "Engineer's Copy" LJA Engineering & Surveying, Inc. 2929 8narpark Drive Phone 713.953,5200 Suite 600 Fax 713.953.5026 Houston, Texas 77042-3703 www.ljaengineering.com January 9, 2002 PROPOSAL Mr. Jarnes W. Keller, P.E. Turner, Collie & Braden, Inc P.O. Box 130089 5757 Woodway Houston, Texas 77057-1599 Re: Engineering Proposal for Hydrology and Hydraulic Analysis Of Corrigan Subdivision Pearland, Texas LJA Proposal No 02-013 Dear Mr. Keller: We are pleased to submit the following Scope of Services for a Hydrology and Hydraulic Analysis of Corrigan Subdivision. It is our understanding that LJA will be providing these engineering services and, as the Program Manager for the City of Pearland, Texas, Turner Collie & Braden is negotiating a contract with our firm. A proposed Scope of Work is enclosed as Attachment A. The following fees, corresponding to Attachment A are proposed in accordance with the attached Professional Services Agreement (PSA). COMPENSATION The compensation for the items of work proposed in the Scope of Services will be on a lump sum basis in accordance with the attached PSA. The estimated fees are as follows: Description Fee Coordination and Meetings Data Collection Existing Condition Analysis Preliminary Impact Analysis Final Impact Analysis $7,500.00 $8,500.00 $18,000.00 $21,500.00 $12,500.00 Any additional tasks specifically requested by Turner Collie & Braden that do not fall under the services described above will be provided on a time and material basis. These additional services shall be approved in writing prior to commencement. a"0 Mr. James W Keller, P.E. January 9, 2002 Page 2 TERMS OF PAYMENT Payment for the above mentioned services will be made on a monthly basis by Turner Collie & Braden based on the schedule in the attached PSA. If this proposal meets with your approval, please execute both copies, returning one copy to our office, and keeping the other for your records. Sincerely, n i Carolyn S gWigan, P.E Manager, Hydrology and Hydraulics CSG/rca Attachment O:\PROPOSAL0002\Turner Collie & Braden \02-013pro.doc ouI uap2J8 alp1Diawn1 FA - Future Appropriation 0 r EA 1 1 -4 V y -a EA 03 0 0 N En w 0 0 429 co W V 0 < < d o o c 7 o N a 5 o • 0 0 n 0 N c K Pearland Parkway (PE & EA) TaaJ1g eiiou6ew 0 cn co a Pearland Parkway Phase II D D Ti D D D D D D D D D D D D D West Mary's Creek Detention CO cp Corrrigan Improvements uo!sua;x3 uapn3 Eft En cn ()1 E 1 W CO a co En CA En CO s N 0 03 peoa Jel!OP(lie8 EA D) W Co 0 En GI N0) Co o D D 0 0 Eft cD W co in 0) 0 0 D D D D D D D D D D D D D D D D D D D D D D D D D D TI m '11 TI 'Ti "71 71 71 71 71 T 71 D D D ➢ D ➢ ➢ D D ➢ D D N n) 0 cn c g 3 0 O, R' DI 'a m 'a g o m ✓ tam ai W O O o 3 a 0 0 (0 G) 3 8 IN3WH3V11tt ID 0 1 2 3 L 4 5 6 7 ras 8 9 10 11 12 13 14 15 16 17 Task Name Corrigan Storm Sewers Preliminary Engineering Services Data Collection Field Reconnaissance Authorization H & H Prep of Contracts Drainage Studies 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 L Authorization ESA Prep of Contracts Phase I ESA Authorization -Survey & Geotech Prep of Contracts Survey ROW Mapping Geotech Studies Preliminary Design Review City of Pearland Final Design Duration 925 days 284 days 28 days 28 days O days 8 days 100 days 0 days' Start Tue 12/11/01 Tue 12/11/01 Tue 12/11/01 Tue 12/11/01 Mon 01/28/02 Mon 01/28/02 Tue 02/05/02 Mon 04/08/02 15 days Mon 04/08/02 50 days Tue 04/23/02 0 days Mon 06/10/02 10 days Mon 06/10/02 75 days 30 days 65 days 270 days Authorization Prep of Contracts ROW Acquisition Design 30% Review 30% Design Design 60% Review 60% Design 90% Review 90% Complete Bid Documents Advertize,8ld & Award Advertize Bid Pre Bid Confrence Receive Bids Recommend Award Award Construction Contract Construction Phase Notice to Proceed 14 days 330 days 0 days 15 days 100 days 60 days 14 days 44 days Thu 06/20/02 Thu 06/20/02 Thu 06/20/02 Tue 12/11/01 Sat 09/07/02 Mon 06/10/02 Mon 06/10/02 Mon 06/10/02 Sat 09/21/02 Sat 09/21/02 Wed 11/20/02 Wed 12/04/02 Finish Tue 06/22/04 Fri 09/20/02 Mon 01/07/02 Mon 01/07/02 Mon 01/28/02 Mon 02/04/02 Wed 05/15/02 Mon 04/08/02 Mon 04/22/02 Tue 06/11/02 Mon 06/10/0-2 Wed 06/19/02 Mon 09/02/02 Fri 07/19/02 Fri 08/23/02 Fri 09/06/02 Fri 09/2-0/02 Mon 05/05/03 Mon 06/10/02 Mon 06/24/02 Sun 12/29/02 Tue 11/19/02 Tue 12/03/02 Thu 01/16/03 14 days Fri 01/17/03 Thu 01/30/03 60 days Fri 01/31/03 Mon 03/31/03 14 days 21 days 42 days O days 0 days 0 days 0 days 0 days 365 days 0 days Construction 365 days Tue 04/01/03 Tue 04/15/03 Mon 05/05/03 Mon 05/05/03 Mon 05/26/03 Mon 06/02/03 Mon 06/09/03 Mon 06/16/03 Mon 06/23/03 Mon 06/23/03 Tue 06/24/03 Mon 04/14/03 Mon 05/05/03 Mon 06/16/03 Mon 05/05/03 Mon 05/26/03 Mon 06/02/03 Mon 06/09/03 Mon 06/16/03 Tue 06/22/04 Mon 06/23/03 Tue 06/22/04 Dec 2002 ji CITY OF PEARLAND MOBILITY & DRAINAGE PROGRAM CORRIGAN DRAINAGE PROJECT Jan Feb Mar Apr 04/08 May Jun 40O6/10 Jul I Aug I Sep Turner Collie & Braden Project: 13-11256 Date: Thu 01/17/02 Task Split Progress Milestone • • Summary Rolled Up Task Oct Nov 2003 Dec Jan iji ..... Feb Apr f' Jun 05/26 6/02 O6/09 �06/16 Rolled Up Split Roiled Up Milestone O Jul 06/23 Oct Nov 2004 Dec Jan Feb Mar Apr May Jun Rolled Up Progress External Tasks Project Summary relliallg Page 1