Loading...
R-2014-041 2014-04-28RESOLUTION NO. R2014-41 A resolution of the City Council of the City of Pearland, Texas, authorizing a contract for professional services, associated with the Right -of -Way Assessment Project, with Infrastructure Management Services in the amount of $314,713.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract for professional services, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract for professional services associated with the Right -of -Way Assessment Project. PASSED, APPROVED and ADOPTED this the 281" day of April, A.D., 2014. ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR `,,,111111,,,'' • ``` ''''/11,1111111NN Resolution No. R2014-041 Exhibit "A" IMM Scope of Work IMS Infrastructure Management Services 1820 W. Drake Dr, Ste 108, Tempe, AZ 85283 Phone: (480) 839-4347 Fax: (480) 839-4348 www.ims-rst.com To: Mike Leech, Senior Engineer Date: April 8th, 2014 From: Zac Thomason, MBA, National Client Project: 2014 Right of Way Services Manager Assessment Program Subject: Scope of Work Document Project No: N/A IMS Infrastructure Management Services is pleased to submit this revised scope of services document to the City of Pearland. The activities were developed using the specifications outlined in the Request for Qualifications, team discussions at the short list presentation on March 3rd 2014, and team revisions of the scope of work document. The scope of services was also designed around the City's desire to keep the data and results in a non-proprietary industry standard format that can be imported into a 3rd party asset management system at a future unknown date. To summarize the scope budget and activity descriptions found on the following pages of this document, we have identified a base scope of services for this assignment. The base scope was designed to implement a turn -key pavement management solution that includes the following activities: • Network segmentation review and preparation • Automated roadway condition assessment • Roadway and right of way imagery acquisition • ROW asset sweep (7 asset types are being inventoried, located, and assessed) • Online data viewer access • Pavement/sidewalk analysis • Comprehensive reporting • City council presentation & meeting • Pavement design, standard plans, & specification consulting services IMS Infrastructure Management Services Pearland Scope Doc 2014 revl.doc page l City of Pearland - 2014 Pavement & Right of Way Management Services Suggested Base Scope of Services Task Activity Project Initiation Quant Units Unit Rate Total 1 Project Initiation & Set Up 2 Network Referencing & GIS Linkage Field Surveys 1 LS $3,500.00 $3,500 455 T -Mi $25.00 $11,375 3 RST Mobilization & Calibration 1 LS $3,000.00 $3,000 4 RST Field Data Collection - Pavements 455 T -Mi $115.00 $52,325 5 Asset Data Collection (GPS & Camera Configuration) 455 T -Mi $20.00 $9,100 Data Management 6 Data QA/QC, Processing, Format, & Supply (Excel, Shapefiie, mg) 455 T -Mi $25.00 $11,375 7 Process Forward View Imagery at 25 -foot Intervals - 1 view 455 T -Mi $15.00 $6,825 8 Condition Data Load - Pavements &Sidewalks 1 LS $5,000.00 $5,000 9 Analysis & Budget Development Results - Pavements &Sidewalks 1 LS $7,500.00 $7,500 10 Final Report (5 & 10 Year Plan) - Pavements &Sidewalks 1 LS $10,500.00 $10,500 11 Online Data Viewer (browser based application w/ 2 years of hosting) 1 LS $13,000.00 $13,000 12 Project Management 1 LS $10,013.00 $10,013 13 ROW Asset Sweep (Sidewalks - Curb/Gutter - Sign/Support - ADA Ramps - Sidew alk 455 T -M i $340.00 $154,700 Obstruction - Storm Sew er hlet - Striping/Markings) 14 City Council Presentation & Meeting 2 EA $3,000.00 $6,000 15 Pavement Design, Standard Plans, & Specifications Consulting Services 1 LS $10,500.00 $10,500 Not to exceed amount = $215/hour + expenses (approximately 55 hours) Project Total: $314,713 Task Description Activities Deliverables Project Initiation: 1. Project Initiation & Set Up Confirm scope, extent and content of surveys, set Technical memo detailing milestones, and deliverables. scope of work, budget and deliverables. Confirm key contacts, roles and responsibilities, and project documentation. Identify location of key data elements such as traffic data, GIS, existing roadway inventories, and pavement management data. Identify deficient data and the means to obtain it. • Confirm phases of the work and invoicing methodology. IMS Infrastructure Management Services Pearland Scope Doc 2014 revl.doc page 2 2. Network Referencing & • Using the City's GIS centerline topology and existing Survey maps and inventory GIS Linkage Field Surveys: 3. RST Mobilization & Calibration 4. RST Field Data Collection - Pavements 5. Asset Data Collection Ws & Camera Configuration) Data Management: 6. Data QA/QC, Processing, Format, & Supply (Excel, Shapefile, and KMZ) pavement inventory, develop a network wide roadway inventory suitable for pavement management purposes. • Include street number and block order in referencing. • Review existing segmentation and recommend updates. • Link each segment to its parent GIS section. • Obtain roadway attributes from GIS for functional class, traffic, width, length, pavement type, curb type, etc. If not available, devise plan to obtain them. • Develop survey maps for use by the RST and client review. • Mobilize surface distress, roughness, and rutting testing equipment to project. • Demonstrate the equipment to the City. • Calibrate equipment. • On all arterials and collectors, complete 2 pass testing collecting up to 9 ASTM D6433 distresses and attributes at 100 -foot intervals on a block by block basis. • • • • Local roadways will be surveyed in a single pass. IMS will survey approximately 450 miles of roadway. Mount at least 4 camera views for video acquisition. Position cameras to capture required sidewalk attributes and optional asset features. The 4 views will include driver front, passenger front, driver rear, and passenger side. • Final number of cameras and specific configuration will be proofed out before commencing data collection. • Develop exceptions report for lengths that do not match GIS. • For each data stream (surface distress, roughness, GPS), aggregate and process the data at the block level. Develop individual index scores for surface distress, structural (if collected), roughness, and LAD as appropriate. for use during the survey. Equipment calibration results Survey 450 miles with Laser RST technology. Video for use in asset database development activities. Excel spreadsheet of the sectional data and index values. Geodatabase and KMZ files delivery. IMS Infrastructure Management Services Pearland Scope Doc 2014 revl.doc page 3 7. Process Forward View Imagery at 25 -foot intervals — 1 view 8. Condition Data Load — Pavements & Sidewalks 9. Analysis & Budget Development Results — Pavements & Sidewalks 10. Final Report (5 & 10 Year Plan) — Pavements & Sidewalks Develop an overall condition score for each section. Shape files of the processed data. • Complete QA of data. Process the forward view (driver front) images at 25 - foot intervals. Images will be in .jpeg format with an associated geodatabase containing hyperlinks. Assemble and load the pavement surface and sidewalk data into the IMS designated pavement management system in preparation of the analysis. No software is being supplied as a part of this contract and all data will be supplied in Excel, Access, Shape file, or Google Earth KMZ format. Develop the intelligence that drives rehabilitation and maintenance selection on each roadway. Develop deterioration models for load during pavement analysis. Review PCI thresholds, performance indexes, functional classification, and all other weighted criteria. Following the field surveys and data processing, complete the following analysis: Present status and PCI report in Excel format c/w PCI charts and backlog. Fix all needs analysis and budget. Steady state (SS), do nothing, unlimited, SS plus 50%, SS minus 50%. Budget driven analysis ($/yr estimate). Integrate City capital plans and "must do's" ($ to hit set PCI and backlog target). After reviewing the analysis and finalizing the results, begin assembling a comprehensive report. The report shall include a summary of the network value, pavement condition, rehabilitation & maintenance treatments, budget scenarios, a review of PCI definitions, the operating parameters utilized, and the results of the survey. The written report shall be supplemented with appendices that contain spreadsheet reports such as: Street Inventory and Condition Summary $ Driven Rehab Program by Segment $ Driven Rehab Program by Year Alternate $ Driven Rehab Programs by Year & Deliver images on flash drive with associated geodatabase. Data load results. Draft analysis and report. Up to 5 models/budget analysis options will be completed. Delivery of draft pavement management report. Deliver 2 hard copies of the final report and an electronic copy on a flash drive. Shape and KMZ files. IMS Infrastructure Management Services Pearland Scope Doc 2014 revl.doc page 4 11. Online Data Viewer 12. Project Management 13. ROW Asset Sweep 14. City Council Presentation and Meeting 15. Pavement Design, Standard Plans, & Specifications Consulting Services Segment. • Deliver draft report to City and incorporate any modifications to the analysis or reporting methodology. • Deliver 2 final reports plus electronic files. • Deliver shape and KMZ files of the final analysis results. • Development of a browser based data viewing application. • Static application that will be loaded with the pavement condition, analysis results, images, and sidewalk inventories. • Price includes 2 years of IMS hosting. • Provide client with periodic e-mail updates and reports. • Meetings to be completed on-site and by conference calls. • Complete project administration and invoicing. Develop a Master Asset List that defines the attributes to be collected for sidewalks, curb/gutter, sign/support, ADA ramps, sidewalk obstructions, storm sewer inlets, and striping/markings. All assets are positionally placed in GIS through the utilization of RST imagery, aerial photography, and internal GIS tool -kits. At a minimum each asset will include: XY coordinates, G/F/P designations, type, and directional location. Deliverable format is a personal geodatabase and the loading of the inventories to the Online Data Viewer Application. Present report to City in a working meeting format. • Create a PowerPoint presentation to showcase the results of the condition survey. • Up to 2 onsite council meetings will be completed. • Hourly rate + expenses = upset limit of $10,500.00 • Review ACP mix designs (up to 5). • Review GBC and subgrade specifications. • Structural design review • Construction standard plans & specifications. Access and training to the browser based application. Status reports and invoices Personal geodatabase with asset inventory. Report meeting and PowerPoint presentation. Pavement design, standard plans, and specifications review. Memo with findings and recommendations. IMS Infrastructure Management Services Pearland Scope Doc 2014 revl.doc page 5