Loading...
R-2014-024 2014-03-10RESOLUTION NO. R2014-24 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO ENTER INTO FINANCING AGREEMENTS WITH THE LOWER KIRBY MUNICIPAL MANAGEMENT DISTRICT AND PEARLAND MUNICIPAL MANAGEMENT DISTRICT NO. 1. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain Financing Agreements by and between the City of Pearland, the Lower Kirby Municipal Management District and Pearland Municipal Management District No. 1, copies of which are attached hereto as Exhibits "A" and "B" and made a part hereof for all purposes, are hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Financing Agreements with the Lower Kirby Municipal Management District and Pearland Municipal Management District No. 1. PASSED, APPROVED and ADOPTED this the 10th day of March, A.D., 2014. ATTEST: NG L4 FING, T t Y SEC' ETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY .:=====,) TOM REID MAYOR Resolution R2014-24 Exhibit "A" FINANCING AGREEMENT THIS FINANCING AGREEMENT (the "Agreement") is entered into as of the 1 o th day of March , 2014 by and between LOWER KIRBY PEARLAND MANAGEMENT DISTRICT, a political subdivision of the State of Texas, organized pursuant to the provisions of Article XVI, Section 59 of the Texas Constitution, was duly created by Senate Bill 1984, 80th Texas Legislature, and codified as Chapter 3840, Texas Special District Local Laws Code (the "Act"), and Chapter 375 of the Texas Local Government Code, as amended (the "District") and THE CITY OF PEARLAND, TEXAS (the "City"). RECITALS WHEREAS, the District was created by the Act and is organized for the purpose of promoting, developing, encouraging, and maintaining employment, commerce, transportation, housing, tourism, recreation, arts, entertainment, economic development, parking, infrastructure, safety, public welfare, and water, sewer, and drainage facilities to serve land and development within its boundaries; and WHEREAS, pursuant to Section 375.096, Local Government Code, the District changed its name by resolution to the "Lower Kirby Pearland Management District," which change was effective March 13, 2012; and WHEREAS, the District was authorized, at an election held on May 10, 2008, to issue bonds for the purposes of promoting, developing, encouraging, and maintaining employment, commerce, transportation, housing, tourism, recreation, arts, entertainment, economic development, parking, infrastructure, safety, public welfare, and water, sewer, and drainage facilities to serve land and development within its boundaries, but has no funds on hand for such purposes at the present time; and WHEREAS, the City is agreeable to advancing funds to the District in order to facilitate development and encouraging the fulfillment of the purposes for which the District was created for the Property located in the District (the "Property"); and WHEREAS, the Board of Directors of the District has determined that it is in the best interest of the District to provide for the design and construction of facilities that promote, develop, encourage, and maintain employment, commerce, transportation, housing, tourism, recreation, arts, entertainment, economic development, parking, infrastructure, safety, public welfare, and water, sewer, and drainage facilities to serve the Property; and WHEREAS, the City is agreeable to advancing funds to or on behalf of the District for the purpose of promoting, developing, encouraging, and maintaining 465729 employment, commerce, transportation, housing, tourism, recreation, arts, entertainment, economic development, parking, infrastructure, safety, public welfare, and water, sewer, and drainage facilities to serve the Property, on the condition that it is reimbursed by the District; and WHEREAS, the District desires to reimburse the City for expenditures made to further the Project (as such term is hereinafter defined) in accordance with State Law, the Act, and Chapter 375 of the Texas Local Government Code, and for certain of such costs that are reimbursable to the City, only following approval from the Texas Commission on Environmental Quality (the "TCEQ"); AGREEMENT Now, Therefore, for and in consideration of the mutual promises, covenants, obligations and benefits of this Agreement, the District and the City contract and agree as follows: ARTICLE I CONSTRUCTION OF THE PROJECT Section 1.01: The Project(s)s. The "Projects" shall be and include the following, which are further identified in the attached Exhibit "A": (a) Regional detention pond site acquisition, including related legal, engineering and acquisition fees, acquired pursuant to the implementation of the District's Regional Drainage Plan; the costs are identified in the attached Exhibit "B"; and (b) Implementation and development of the Regional Drainage Plan, including: engineering, land acquisition, design and construction of drainage facilities to serve the development in the District, whether designed and constructed in phases or at one time; and (c) Implementation of Phase I of the Regional Drainage Plan, including engineering design, construction and construction supervision and related costs as identified in the attached Exhibit "C"; and (d) Certain water, sewer and drainage facilities and road improvements to promote the orderly development of the District as identified in the attached Exhibit "A"; and -2- 465729 (e) Costs related to the reconstruction of Hooper Road, including but not limited to land acquisition, the installation of storm sewer, sanitary sewer, water lines, lighting and landscaping; and (f) Kirby Drive detention facility improvements, including but not limited to the detention connection on the west side of Kirby. Design and construction costs include costs related to permits, environmental, testing, surveying, inspection and construction and project management. As projects are agreed upon by the District and City, such projects shall be designated in accordance with Section 1.04 of this Agreement. The City and the District shall determine the timing of construction of the phases of the Project so that the Property may be developed pursuant to the development plans of the developers and businesses within the District. Section 1.02: Design of the Project(s). All facilities to be constructed as a part of the Project shall be designed by the engineer employed by the District (the "Engineer"), or if authorized by the District, by an engineer employed by the City. If the City is pre - financing a Project, the City shall approve the design engineering contracts; and vice - versa if the City is employing its own engineer to design a Project, the District shall approve the design engineering contracts. The design of the Project(s) shall be subject to the approval of all governmental entities with jurisdiction, including, without limitation, the City, Harris County, the TCEQ (if for a water, sewer or drainage project), and the Texas Department of Health (where appropriate). Section 1.03: Construction and Acquisition of Project(s). (a) The Project(s) shall be constructed in easements and rights-of-way in the name of the District if such facilities are to be maintained by the District, or if not, in public easements and rights-of-way. (b) The Project(s) shall be installed and the construction contracts shall be awarded in accordance with the Act and in full compliance with the rules and regulations of the TCEQ, if applicable, and any other local, state or federal agencies having jurisdiction. (c) The Board of Directors of the District shall authorize the award of the construction contracts, provided that the City authorizes such award. (d) The Project(s) may be constructed in stages or by sections pursuant to development plans of developers and businesses within the District. (e) Following completion of construction and acceptance of the Project(s) by the City and the District, the District will acquire, operate and maintain the regional -3- 465729 drainage ditches and detention facilities and the City will operate and maintain the water, sewer and storm sewer infrastructure portions of the Project(s) and roadways. Section 1.04: Subsequent Letter Agreements. As the Project(s) are authorized to be designed in accordance with Section 1.01 and as they are constructed in phases, the District and the City shall execute Letter agreements for each design authorization and construction phase, substantially in the form attached as Exhibit "D". The purpose of the letter agreement is to confirm the design and construction of that phase of the Project(s), that the City will pre -finance all associated costs of that phase of the Project(s), and that the City will be reimbursed by the District, all in accordance with the terms and conditions of this Agreement. ARTICLE II REIMBURSEMENT FOR FUNDS ADVANCED Section 2.01: Reimbursement. (a) The District agrees to make all reasonable efforts to obtain any required approvals for the sale of bonds and to sell the bonds for the purpose of repaying the City at the earliest feasible date, in accordance with this Article II. The District agrees to make partial reimbursement(s) to the City if the conditions set forth herein are satisfied. The District shall be obligated to submit an application to the TCEQ as may be necessary to fund water, sewer or drainage facilities, and, following its approval, to sell bonds to reimburse the City for portions of the Project(s) when the following have occurred as related to the portion of the Project(s) for which the City is being reimbursed: (1) For water, sewer and drainage facilities, the economic feasibility rules of the TCEQ are satisfied; (2) For such facilities described above in (1), the TCEQ approves the issuance and sale of the bonds; (3) satisfied; For all Projects, the District's priority of reimbursement policy is (4) For all Projects, the Attorney General of Texas approves the bonds; (5) For all Projects, the Comptroller of Public Accounts of the State of Texas registers the bonds. (b) In order to determine whether the economic feasibility rules of the TCEQ are met, the District shall at least once each year request a certificate of estimated assessed valuation from the Harris County Appraisal District. -4- 465729 (c) When facilities are required to receive TCEQ approval, the District shall be obligated to request TCEQ approval for 100% reimbursement of costs and to pay such percentage of reimbursement, if allowed under the TCEQ Rules. (d) Upon consummation of the sale of the bonds and approval by the Board of Directors of the reimbursement audit performed in connection with each sale, the District agrees that it will pay the City for all sums advanced to, or on behalf of, the District to the maximum extent permitted under the Rules of the TCEQ, including payment of "developer interest" on the funds so advanced to or paid on behalf of the District. For Projects reimbursed which do not require TCEQ approval to issue bonds, "developer interest" shall be paid at the net effective interest rate of the bonds issued to make reimbursement for the same time period as is allowed under TCEQ rules. Section 2.02: The City's Obligations. The City shall comply with all of the conditions established by the City relating to the development of the property. In connection with the reimbursements to the City, the City must provide all information that may be required by the District, its financial advisor, or attorney in connection with the preparation of the bond application and the Preliminary Official Statement or other disclosure documents related to the sale of the bonds and must provide sufficient information to the District's auditor in order that the District's auditor may perform a reimbursement audit following the sale of the bonds. ARTICLE III REPRESENTATIONS Section 3.01: Representations by the City. The City represents that: (a) This Agreement, the transactions contemplated herein, and the execution and delivery of this Agreement have been duly authorized by the City in accordance with its Home Rule Charter. (b) This Agreement and the representations and covenants contained herein, and the consummation of the transactions contemplated herein, will not violate or constitute a breach of any contract or other agreement to which the City is a party. Section 3.02: Representations by District. The District represents and covenants that it will: (a) use its best efforts to prepare the necessary materials and reports to be filed with the TCEQ for approval of any bond issues (or if TCEQ approval is not required), to sell bonds in an amount sufficient to, among other things, reimburse the City in a timely manner in accordance with this Agreement; -5- 465729 (b) use its best efforts to market and sell its bonds in the manner set forth herein; (c) use its best efforts to obtain the approval of the Attorney General of Texas of the bonds; and (d) use its best efforts to reimburse the City upon the terms set forth herein at the earliest practicable time. ARTICLE IV DEFAULT Section 4.01: Default by the City. In the event of default by the City, the District shall be entitled to assume the outstanding contracts and prosecute construction of the facilities to conclusion. In the event the District exercises this option, the District shall reimburse the City the amount of the advances, less all additional costs incurred by the District, if any, in prosecuting completion of the facilities due to the default, when it is able to issue bonds to finance the particular facilities. Section 4.02: Default by Either Party. In the event of default by either party hereto, either party may employ attorneys to pursue its legal rights; and the prevailing party shall be entitled to payment by the other party of all reasonable attorneys' fees incurred by the prevailing party. ARTICLE V MISCELLANEOUS Section 5.01: Severability. The provisions of this Agreement are severable, and if any provision or part of this Agreement or the application thereof to any person or circumstance shall ever be held by any court of competent jurisdiction to be invalid or unconstitutional for any reason, the remainder of this Agreement and the application of such provision or part of this Agreement to other persons or circumstances shall not be affected thereby. Section 5.02: Modification. This Agreement shall be subject to change or modification only with the mutual written consent of the City and the District. Section 5.03: Assignability. This Agreement shall not be assignable by either party without the prior written consent of the other party, which consent shall not be unreasonably withheld. Upon the request of the City, the District shall acknowledge an assignment of the right to reimbursement hereunder to a lender of the City, so long as said lender is not granted a lien upon any of the facilities constructed as part of the -6- 465729 Project(s) and agrees in writing to execute a release and receipt of payment upon any reimbursement. Section 5.04: Applicable Law. This Agreement shall be governed by, and construed in accordance with, the laws of the State of Texas. Section 5.05: Parties at Interest. This Agreement shall be for the sole and exclusive benefit of the parties hereto and shall never be construed to confer any benefit upon any third party, except the successor in title to the Property. Section 5.06: Term. Except as otherwise provided herein, this Agreement shall be in force and effect from the date of execution hereof for a term of 40 years or Until the transactions contemplated herein are consummated, whichever first occurs. Section 5.07: Force Majeure. If either party is rendered unable, wholly or in part, by force majeure to carry out any of its obligations under this Agreement, then the obligations of either party to the extent affected by such force majeure and to the extent that due diligence is being used to resume performance at the earliest practicable time, shall be suspended during the continuance of any inability so caused to the extent provided but for no longer period. Such cause, as far as possible, shall be remedied with all reasonable diligence. The term "force majeure", as used herein, shall include, without limitation of the generality thereof, acts of God, strikes, lockouts, or other industrial disturbances, acts of the public enemy, orders of any kind of the Government of the United States or of the State of Texas or any civil or military authority, insurrections, riots, epidemics, landslides, lightning, earthquakes, fires, hurricanes, storms, floods, washouts, droughts, arrests, restraint of government and people, civil disturbances, explosions, breakage or accidents to machinery, pipe -lines or canals, partial or entire failure of water necessary for operation of the sewer system, or of the District to receive waste, and any other inabilities of either party, whether similar to those enumerated or otherwise, which are not within the control of either party, which either party could not have avoided by the exercise of due diligence and care. It is understood and agreed that the settlement of strikes and lockouts shall be entirely within the discretion of either party, and that the above requirement that any force majeure shall be remedied with all reasonable dispatch shall not require the settlement of strikes and lockouts by acceding to the demand of the opposing party or parties when such settlement is unfavorable to it in the judgment of the affected party. [EXECUTION PAGE FOLLOWS] -7- 465729 IN WITNESS WHEREOF, the parties hereto have executed this Agreement in multiple copies, each of equal dignity, as of the date and year set forth on the first page hereof. LOWER KIRBY PEARI.ANTi MANAGEMENT DISTRICT By: ATTEST: By: Secittary, Board of Directors (SEAL) , "1. 4Ge jfi' • '-. •ir CO CC ....... Nils Hs ',tot -8- 465729 Presiden t/8oa r ectors City of P=. :nd, Te : / By: Ci ana; r, y of Pearland -9- 465729 LJA Engineering, Inc. LOWER KIRBY PEARLAND MANAGEMENT DISTRICT PEARLAND MUNICIPAL MANAGEMENT DISTRICT NO. 1 FINANCING AGREEMENT PROJECTS SUMMARY OF COSTS FEBRUARY 6, 2014 ITEMS COSTS Drainage System $ 5,064,844 Water System $ 622,656 Sanitary Sewer System $ 885,938 Detention Ponds $ 13,395,313 Water, Sewer, Drainage Total $ 19,968,750 Streets $ 5,851,563 Electric $ 5,596,875 Traffic Items $ 2,457,813 Streetscape and Sidewalks $ 4,212,500 Street Total $ 18,118,750 Contingencies (10%) Engineering and Testing (18%) TOTAL W;\Land\2209\0000\Agreements\Lower Kirby LFA Costs 2-6-14.xlsx $ 3,808,750 $ 6,855,750 $ 48,752,000 Exhibit A City of Pearland Regional Detention Pond Aquisition Cost Land Acquisitions $1,900,000.00 Original Appraisal $2,750.00 Second Appraisal $2,500.00 Appraisal Update and Testing $8,625.00 Commissioner Fees $1,050.00 Abstract $479.00 Legal Costs $32,348.76 Total $1,947,752.76 EXHIBIT B GRAMMAR.RD VIII1211 11111123/01.W4ausins Exhibit C ==airmissimuli"---„,,emsissimajoioffesaw 1 w 641291.111 FRUGE-RD LOWER KIRBY PEARLAND UNICIPAL MANAGEMENT DISTRICT FINANCING AGREEMENT MAP FEBRUARY, 2014 1 inch = 1,000 feet I= LOWER KIRBY PEARLAND MGMT DIST I *ion DRAINAGE IMPROVEMENTS ROW GMENT SEGMENT SEGMENT limm SEGMENT SEGMENT A SEGMENT F -SEGMENT K BannoSEGMENT G SEGMENT L C SEGMENT H sinimPSEGMENT M D - SEGMENT I SEGMENT N E fisgio SEGMENT J •••••PSEGMENT 0 SEGMENT P Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 LOWER KIRBY URBAN CORE SUMMARY CONSTRUCTION COST ESTIMATE DATE: 10/21/11 Segment Name A S. Spectrum 288 to Promenade Streets $ 264,000.00 Drainage $ 980,000.00 Water $ Sewer $ - Electric $ 211,000.00 Traffic Items $ Streetscape $ 264,000.00 Segment A Total $ 1,719,000.00 B S. Spectrum - Promenade to TXDOT Streets Drainage Water Sewer Electric Traffic Items Streetscape Segment B Total $ C S. Spectrum - TXDOT to Kirb D 668,000.00 1,009,000.00 54,000.00 45, 000.00 337,000.00 280,000.00 267,000.00 2,660,000.00 Streets Drainage Water Sewer Electric Traffic Items Streetscape Segment C Total D Kirb Drive - Beltwa 8 to Fru•e 647, 000.00 1,253,000.00 50, 000.00 32, 000.00 325,000.00 280, 000.00 258, 000.00 2,845,000.00 Streets Drainage Water Sewer Electric Traffic Items Streetscape Segment D Total 1,017,000.00 720, 000.00 1,737,000.00 E N Spectrum/Riley - Kirby to Almeda School Rd Streets $ 1,306,000.00 Drainage $ 386,000.00 Water $ 222, 000.00 Sewer $ 200,000.00 Electric $ 1,019,000.00 Traffic Items $ Streetscape $ 812,000.00 Segment E Total $ 3,945,000.00 3/12/2014 Page C1 of C2 Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 F N. Spectrum: TXDOT to Kirb Streets Drainage Water Sewer Electric Traffic Items Streetscape Segment F Total G N. Spectrum: Promenade to TXDOT 560, 000.00 280,000.00 280,000.00 224, 000.00 1,344,000.00 Streets $ 892,000.00 Drainage $ Water $ Sewer $ Electric $ 446,000.00 Traffic Items $ 280,000.00 Streetscape $ 356,000.00 Segment G Total $ 1,974,000.00 H Promenade: Beltway 8 to N. Spectrum Streets $ 549, 000.00 Drainage $ Water Sewer Electric Traffic Items Streetscape Segment H Total Promenade: N. S•ectrum to S. S•ectrum Streets Drainage Water Sewer Electric Traffic Items Streetscape Segment I Total 258, 000.00 220,000.00 1,027,000.00 673, 000.00 346,000.00 337,000.00 280,000.00 268,000.00 1,904,000.00 3/12/2014 Page C2 of C2 LOWER KIRBY URBAN CORE SUMMARY CONSTRUCTION COST ESTIMATE DATE: 10/21/11 Segment J K Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713)462-3178 Name Fruge: Promenade to S. Spectrum (Curve) Streets $ 208,000.00 Drainage $ 329,000.00 Water $ 65, 000.00 Sewer $ 76,000 00 Electric $ 403,000.00 Traffic Items $ 280,000.00 Streetscape $ 258, 000.00 Segment J Total $ 1,619,000.00 Promenade: S. S s ectrum to Fru . e Streets Drainage Water Sewer Electric Traffic Items Streetscape Segment K Total 403,000.00 474,000.00 66,000.00 166,000.00 413,000.00 280,000 00 $ 343,000 00 $ 2,145,000.00 L Fruge: Promenade to TXDOT Streets $ 189,000.00 Drainage $ Water $ 32,000.00 Sewer $ 158,000.00 Electric $ 195,000.00 Traffic Items $ 280,000.00 Streetscape $ 169,000.00 Segment L Total $ 1,023,000.00 M Fruge: TXDOT to Kirby Streets Drainage Water Sewer Electric Traffic Items Streetscape Segment M Total $ $ $ N Fruge: Kirby to Hooper 287,000.00 48, 000.00 119,000.00 296, 000.00 280,000.00 188,000.00 1,218,000.00 Streets $ 158,000.00 Drainage $ Water $ 49,000 00 Sewer $ 82,000 00 Electric $ 307,000 00 Traffic Items $ 280,000 00 Streetscape $ 196,000.00 Segment N Total $ 1,072,000.00 Z'.\Community Development\Infrastructure \Drainage\Lower Kirby Regional Detention \Agreements\Budgets\Attachment A Construction Project Cos?Lmies4 14.xlsx Page C1 of C34 Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 0 Hooper: Beltway 8 to N. Spectrum Streets $ 483,000.00 Drainage $ 1,568,000.00 Water $ 146,000.00 Sewer $ 194,000.00 Electric $ 928,000.00 Traffic Items $ 280,000.00 Streetscape $ 597,000.00 Segment N Total $ 4,196,000.00 P Hooper: N. Spectrum to Fruge Streets Drainage Water Sewer Electric Traffic Items Streetscape Segment N Total 203, 000.00 138,000.00 65, 000.00 62,000.00 392, 000.00 66,000.00 252, 000.00 1,178,000.00 notal tor all Segments $ 31,606,000.00 I Z:\Community Development\Infrastructure \Drainage\Lower Kirby Regional Detention\Agreements\ Budgets\Attachment A_Construction Project Cofta410114 14.xlsx Page C2 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 UNIT Segment A QTY UNIT PRICE TOTAL COST Segment A - S. Spectrum 288 to Promenade Total Segment Length Existing Segment Length New Segment Length Paving AV -82-44 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) Roadway Excavation PAVING ITEMS 8 -inch stabilized subgrade Lime for Stabilization (7% per dry weight) 10 -inch Reinforced Concrete Pavement (45' B -B) 6 -inch Reinforced Concrete Curb Drainage Type "C -2A" Manholes 24 -inch Leads 54 -inch Sewer RCP Conveyance to Ex. Poag Pond (10% of Drainage Cost) Water Sewer Electric Ductbank Street Light Streetscape Sidewalks Street Trees Irrigation 1620 ft 810 ft 810 ft AC CY SY. TON SY. L.F, EA. EA. L.F. L.F. EA. LF. LF SY LF. L. F 2 $ 1,200.00 $ 2,000.00 2,766 $ 3.25 $ 9,000.00 4,230 $ 1.75 99 $ 120.00 4,050 $ 36.00 1,620 $ 2.50 $ 7,000.00 $ 12,000.00 $ 146,000.00 $ 4,000.00 Sub Total $ 180,000 00 Appurtenances (5%) Contingency (25%) Engineering (12%) Subtotal Items: 4 2 44 3,048 1 $ 3,100.00 $ 3,500.00 $ 50.00 $ 175.00 $ 55,400.00 $ 9,000 00 $ 47,000.00 $ 28,000.00 $ 264,000.00 $ 12,000.00 $ 7,000.00 $ 2,000.00 $ 533,000.00 $ 55,000.00 Appurtenances (15%) $ 91,000.00 Contingency (25%) $ 175,000.00 Engineering (12%) $ 105,000.00 Subtotal Items: $ 980,000.00 0 $ 0 $ $ $ 810 $ 165.00 $ 134,000 00 6 $ 2,700.00 $ 16.000.00 2,160 1,620 1620 Contingency (25%) $ 38,000.00 Engineering (12%) $ 23,000.00 Subtotal Items: $ 211,000.00 $ 32.00 $ $ 29.00 $ $ 4500 $ 69,000 00 47,000 00 73,000 00 3/3/2014 Page C3 of C34 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713)462-3178 Segment A UNIT QTY UNIT PRICE TOTAL COST Segment A - S. Spectrum 288 to Promenade Contingency (25%) $ 47,000.00 Engineering (12%) $ 28,000.00 Subtotal Items: $ 264,000.00 1 Segment Total: $ 1,719,000.00 I 3/3/2014 Page C4 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment e UNIT QTY UNIT PRICE TOTAL COST Segment B - S. Spectrum: Promenade to TXDOT Total Segment Length 1310 ft Existing Segment Length 0 ft New Segment Length 1310 ft Paving BV -114-70 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) AC 4 $ 1,200.00 $ 4,000.00 Roadway Excavation CY 6,909 $ 3.25 $ 22,000.00 PAVING ITEMS 8 -inch stabilized subgrade SY. 10,626 $ 1.75 $ 19,000.00 Lime for Stabilization (7% per dry weight) TON 249 $ 120.00 $ 30,000.00 10 -inch Reinforced Concrete Pavement (71' B -B) SY. 10,334 $ 36.00 $ 372,000.00 6 -inch Reinforced Concrete Curb L.F, 2,620 $ 2.50 $ 7,000.00 Sub Total for Segment B Paving $ 454,000.00 Appurtenances (5%) $ 23,000.00 Contingency (25%) $ 119,000.00 Engineering (12%) $ 72,000.00 Total Segment B Items: $ 668,000.00 Drainage Type "C -2A" EA. 2 $ 3,100.00 $ 6,000.00 Manholes EA. 2 $ 3,500.00 $ 7,000.00 24 -inch Leads L.F. 40 $ 50.00 $ 2,000.00 48" X 72" RCB L.F. 2,308 $ 265.00 $ 612,000.00 Sub Total for Segment B Drainage $ 627,000.00 Appurtenances (15%) $ 94,000.00 Contingency (25%) $ 180,000.00 Engineering (12%) $ 108,000.00 Subtotal Items: $ 1,009,000.00 Water 8" PVC Pipe LF. 1,310 $ 16.00 $ 21,000.00 Fire Hydrant EA. 3 $ 2,700.00 $ 8,000.00 8" Gate Valve EA. 2 $ 700.00 $ 1,000 00 Sub Total for Segment B Water $ 30,000.00 Appurtenances (25%) $ 8,000.00 Contingency (25%) $ 10,000.00 Engineering (12%) $ 6,000.00 Subtotal Items: $ 54,000.00 Sanitary Sewer 8" SDR -26 LF 1,122 $ 22.00 $ 25,000.00 Sanitary Sewer Manhole (0-8') EA 3 $ 2,000.00 $ 6,000 00 Extradepth Manhole VF. 1 $ 100.00 $ - 3/3/2014 Page C5 of C34 DESCRIPTION Pate Engineers, inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment B UNIT QTY UNIT PRICE TOTAL COST Segment B - S. Spectrum: Promenade to TXDOT Trench Safety Systems LF 1,122 $ 0.50 $ 1,000.00 Sub Total for Segment B Sewer $ 32,000.00 Appurtenances (10%) $ 3,000.00 Contingency (15%) $ 5,000.00 Engineering (12%) $ 5,000.00 Subtotal Items: $ 45,000.00 Electric Ductbank LF. 1,314 $ 165.00 $ 217,000.00 Street Light LF 9 $ 2,700.00 $ 24,000.00 Traffic Items Signalized Intersection Streetscape Sidewalks Street Trees Irrigation Contingency (25%) $ 60,000.00 Engineering (12%) $ 36,000.00 Subtotal Items: $ 337,000.00 EA. 1 $ 200,000.00 $ 200,000.00 Contingency (25%) $ 50,000.00 Engineering (12%) $ 30,000.00 Subtotal Items: $ 280,000.00 SY 2,911 $ 32.00 $ 93,000.00 LF. 1,310 $ 29.00 $ 38,000.00 L.F. 1310 $ 45.00 $ 59,000.00 Contingency (25%) $ 48,000.00 Engineering (12%) $ 29,000.00 Subtotal Items: $ 267,000.00 Segment Total: $ 2,660,000.00 3/3/2014 Page C6 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 UNIT QTY UNIT PRICE Segment C TOTAL COST Segment C - S. Spectrum: TXDOT to Kirby Dr. Total Segment Length Existing Segment Length New Segment Length Paving BV -114-70 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) Roadway Excavation PAVING ITEMS 8 -inch stabilized subgrade Lime for Stabilization (7% per dry weight) 10 -inch Reinforced Concrete Pavement (71' B -B) 6 -inch Reinforced Concrete Curb Drainage Type"C-2A" Manholes 24 -inch Leads 48" X 84" RCB Water 8" PVC Pipe Fire Hydrant 8" Gate Valve Sewer 8" SDR -26 Sanitary Sewer Manhole (0-8') Extradepth Manhole 1270 ft 0 ft 1270 ft AC CY SY. TON SY. L. F, EA. EA. L.F. L. F. 4 $ 1,200 00 $ 6.698 $ 3.25 $ 10,301 241 10,019 2,540 $ 1.75 $ $ 120.00 $ $ 36.00 $ $ 2.50 $ Sub Total $ 4,000.00 22,000.00 18, 000.00 29,000.00 361,000.00 6,000.00 440,000 00 Appurtenances (5%) $ 22,000.00 Contingency (25%) $ 116,000.00 Engineering (12%) $ 69,000.00 Total Segment C Items: $ 647,000.00 2 2 40 2,422 $ 3,100.00 $ $ 3,500.00 $ $ 50.00 $ $ 315.00 $ Sub Total for Segment Drainage $ LF. EA EA LF. EA. VF. 6,000.00 7,000.00 2,000.00 763,000.00 778,000.00 Appurtenances (15%) $ 117,000.00 Contingency (25%) $ 224,000.00 Engineering (12%) $ 134,000.00 Subtotal Items: $ 1,253,000.00 1,270 3 2 $ 16.00 $ 2,700.00 $ 700.00 Sub Total for Segment Water Appurtenances (25%) Contingency (25%) Engineering (12%) Subtotal Items: 20,000.00 8,000 00 1,000.00 801 $ 22.00 $ 2 $ 2,000.00 $ 5 $ 100 00 $ 29,000.00 7,000.00 9,000.00 5,000 00 50,000.00 18,000 00 4,000.00 1,000.00 3/3/2014 Page C7 of C34 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment C UNIT QTY UNIT PRICE TOTAL COST Segment C - S. Spectrum: TXDOT to Kirby Dr. Trench Safety Systems LF 801 $ 0.50 $ Sub Total for Segment Water $ 23,000.00 Appurtenances (10%) $ 2,000.00 Contingency (15%) $ 4,000.00 Engineering (12%) $ 3,000.00 Subtotal Items: $ 32,000.00 Electric Ductbank LF 1,272 $ 165.00 $ 210,000.00 Street Light LF 8 $ 2,700.00 $ 22,000.00 Traffic Items Signalized Intersection Streetscape Sidewalks Street Trees Irrigation Contingency (25%) $ 58,000.00 Engineering (12%) $ 35,000.00 Subtotal Items: $ 325,000.00 EA. 1 $ 200,000.00 $ 200,000.00 Contingency (25%) $ 50,000.00 Engineering (12%) $ 30,000.00 Subtotal Items: $ 280,000.00 SY 2,822 $ 32.00 $ 90,000.00 LF. 1,270 $ 29.00 $ 37,000.00 L.F. 1270 $ 45.00 $ 57,000.00 Contingency (25%) $ 46,000.00 Engineering (12%) $ 28,000.00 Subtotal Items: $ 258,000.00 Segment Total: $ 2,845,000.00 3/3/2014 Page C8 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment D UNIT QTY UNIT PRICE TOTAL COST Segment D - Kirby Drive: Beltway 8 to Fruge Total Segment Length 4400 ft Existing Segment Length 4400 ft New Segment Length 0 ft Paving 0 $ Drainage 0 $ Water 0 $ Sewer 0 $ $ $ $ $ Electric Ductbank LF 4,400 $ 165.00 $ 726,000 00 Street Light LF 0 $ 2,700.00 $ Streetscape Sidewalks Street Trees Irrigation Contingency (25%) $ 182,000.00 Engineering (12%) $ 109,000.00 Subtotal Items: $ 1,017,000.00 SY 5,867 $ 32.00 $ 188,000.00 LF. 4,400 $ 29.00 $ 128,000.00 L.F. 4,400 $ 45.00 $ 198,000.00 Contingency (25%) $ 129,000.00 Engineering (12%) $ 77,000.00 Subtotal Items: $ 720,000.00 Segment Total: $ 1,737,000.00 I 3/3/2014 Page C9 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment E UNIT QTY UNIT PRICE TOTAL COST Segment E - N Spectrum/Riley: Kirby to Almeda School Rd Total Segment Length 5200 ft Existing Segment Length 1200 ft New Segment Length 4000 ft Paving BV -114-70 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) AC 8 $ 1,200.00 $ 9,000.00 Roadway Excavation CY 13,659 $ 3 25 $ 44,000.00 PAVING ITEMS 8 -inch stabilized subgrade SY. 20,889 $ 1.75 $ 37,000.00 Lime for Stabilization (7% per dry weight) TON 489 $ 120.00 $ 59,000.00 10 -inch Reinforced Concrete Pavement (45' B -B) SY. 20,000 $ 36.00 $ 720,000.00 6 -inch Reinforced Concrete Curb L.F, 8,000 $ 2.50 $ 20,000.00 Drainage Street Drainage L.F Sub Total $ 889,000.00 Appurtenances (5%) $ 44,000.00 Contingency (25%) $ 233,000 00 Engineering (12%) $ 140,000.00 Total Segment E Items: $ 1,306,000.00 4,000 $ 60.00 $ 240,000.00 Appurtenances (15%) $ 36,000.00 Contingency (25%) $ 69,000.00 Engineering (12%) $ 41,000.00 Subtotal Items: $ 386,000.00 Water 12" PVC Pipe LF. 4,000 $ 25.00 $ 100,000.00 Fire Hydrant EA. 8 $ 2,700.00 $ 22,000.00 12" Gate Valve EA 4 $ 1,000.00 $ 4,000.00 Sub Total for Segment Water $ 126,000.00 Appurtenances (25%) $ 32,000.00 Contingency (25%) $ 40,000.00 Engineering (12%) $ 24,000.00 Subtotal Items: $ 222,000.00 Sewer 12" SDR -26 LF 4,000 $ 30.00 $ 120,000.00 Sanitary Sewer Manhole (0-8') EA 10 $ 2,000.00 $ 20,000.00 Trench Safety Systems LF 4,000 $ 0.50 $ 2,000.00 Sub Total for Segment B Sewer $ 142,000.00 Appurtenances (10%) $ 14,000.00 3/3/2014 Page C10 of C34 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 UNIT QTY UNIT PRICE Segment E TOTAL COST Segment E - N Spectrum/Riley: Kirby to Almeda School Rd Electric Ductbank Street Light Traffic Items Signalized Intersection Streetscape Sidewalks Street Trees Irrigation LF. LF. EA. SY LF. L. F Contingency (15%) $ 23,000.00 Engineering (12%) $ 21,000.00 Subtotal Items: $ 200,000.00 4,000 $ 165.00 $ 25 $ 2,700.00 $ 660,000.00 68,000.00 Contingency (25%) $ 182,000.00 Engineering (12%) $ 109,000.00 Subtotal Items: $ 1,019,000.00 0 $ 200,000.00 $ 8,889 4,000 4,000 Contingency (25%) $ Engineering (12%) $ Subtotal Items: $ 32.00 29.00 45.00 Contingency (25%) Engineering (12%) Subtotal Items: $ 284,000.00 $ 116,000.00 $ 180,000.00 $ 145,000.00 $ 87,000.00 $ 812,000.00 Segment Total: $ 3,523,000.00 3/3/2014 Page C11 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment F UNIT QTY UNIT PRICE TOTAL COST Segment F - N. Spectrum: TXDOT to Kirby Dr. Total Segment Length 1100 ft Existing Segment Length 0 ft New Segment Length 1100 ft Paving BV -114-70 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) AC. 3 $ 1,200 00 $ 4,000 00 Roadway Excavation CY. 5,801 $ 3,25 $ 19,000 00 PAVING ITEMS 8 -inch stabilized subgrade SY. 8,922 $ 1.75 $ 16,000 00 Lime for Stabilization (7% per dry weight) TON 209 $ 120.00 $ 25,000 00 10 -inch Reinforced Concrete Pavement (71' B -B) SY. 8,678 $ 36.00 $ 312,000.00 6 -inch Reinforced Concrete Curb L.F, 2,200 $ 2.50 $ 6,000 00 Sub Total $ 380,861.75 Sub Total for Segment Paving $ 381,000.00 Appurtenances (5%) $ 19,000.00 Contingency (25%) $ 100,000 00 Engineering (12%) $ 60,000.00 Total Segment F Items: $ 560,000.00 Drainage 24" RCP LF 510 $ 50.00 $ 26,000.00 30" RCP LF 374 $ 65.00 $ 24,000.00 Type C Inlets EA 6 $ 3,100 00 $ 19,000.00 Water Sewer Appurtenances (15%) $ 10,000.00 Contingency (25%) $ 20,000.00 Engineering (12%) $ 12,000 00 Subtotal Items: $ 111,000.00 0 $ - $ 0 $ - $ Electric Ductbank LF 1,099 $ 16500 $ 181,000.00 Street Light LF 7 $ 2,700 00 $ 19,000 00 Contingency (25%) $ 50,000.00 Engineering (12%) $ 30,000 00 Subtotal Items: $ 280,000.00 Traffic Items Signalized Intersection EA. 1 $ 200,000.00 $ 200,000.00 3/3/2014 Page C12 of C34 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 UNIT QTY UNIT PRICE Segment F TOTAL COST Segment F - N. Spectrum: TXDOT to Kirby Dr. Streetscape Sidewalks Street Trees Irrigation SY LF. L.F. 2,444 1,100 1,100 Contingency (25%) $ 50,000.00 Engineering (12%) $ 30,000.00 Subtotal Items: $ 280,000.00 $ 32 00 $ $ 29.00 $ $ 45 00 $ Contingency (25%) Engineering (12%) Subtotal Items: 78,000.00 32,000.00 50,000.00 $ 40,000.00 $ 24,000.00 $ 224,000.00 Segment Total: $ 1,455,000.00 3/3/2014 Page C13 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment G UNIT QTY UNIT PRICE TOTAL COST Segment G - N. Spectrum: Promenade to TXDOT Total Segment Length 1750 ft Existing Segment Length 0 ft New Segment Length 1750 ft Paving BV -114-70 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) AC. 5 $ 1,200.00 $ 6,000 00 Roadway Excavation CY 9,204 $ 3.25 $ 30,000.00 PAVING ITEMS 8 -inch stabilized subgrade SY 14,194 $ 1.75 $ 25,000.00 Lime for Stabilization (7% per dry weight) TON 333 $ 120.00 $ 40,000 00 10 -inch Reinforced Concrete Pavement (71' B -B) SY 13,806 $ 36.00 $ 497,000.00 6 -inch Reinforced Concrete Curb L F, 3,500 $ 2.50 $ 9,000.00 Sub Total $ 607,000.00 Sub Total for Segment Paving $ 607,000.00 Appurtenances (5%) $ 30,000.00 Contingency (25%) $ 159,000.00 Engineering (12%) $ 96,000.00 Total Segment G Items: $ 892,000.00 Drainage 0 $ $ Water 0 $ $ Sewer 0 $ - $ Electric Ductbank LF 1,745 $ 165.00 $ 288,000.00 Street Light LF 11 $ 2,700.00 $ 30,000.00 Traffic Items Signalized Intersection Contingency (25%) $ 80,000.00 Engineering (12%) $ 48,000.00 Subtotal Items: $ 446,000.00 EA 1 $ 200,000.00 $ 200,000.00 Contingency (25%) $ 50,000.00 Engineering (12%) $ 30,000.00 Subtotal Items: $ 280,000.00 Streetscape Sidewalks SY 3,889 $ 32.00 $ 124,000.00 Street Trees LF. 1,750 $ 29 00 $ 51,000.00 Irrigation L F 1,750 $ 45.00 $ 79,000.00 Contingency (25%) $ 64,000.00 3/3/2014 Page C14 of C34 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment G UNIT QTY UNIT PRICE TOTAL COST Segment G - N. Spectrum: Promenade to TXDOT Engineering (12%) $ 38,000.00 Subtotal Items: $ 356,000.00 1 Segment Total: $ 1,974,000.00 I 3/3/2014 Page C15 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 UNIT QTY UNIT PRICE Segment H TOTAL COST Segment H - Promenade: Beltway 8 to N. Spectrum Total Segment Length Existing Segment Length New Segment Length Paving BV -114-70 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) Roadway Excavation PAVING ITEMS 8 -inch stabilized subgrade Lime for Stabilization (7% per dry weight) 10 -inch Reinforced Concrete Pavement (71' B -B) 6 -inch Reinforced Concrete Curb Drainage Water Sewer Electric Ductbank Street Light Streetscape Sidewalks Street Trees Irrigation 1550 ft 470 ft 1080 ft AC CY SY TON SY. L F, LF LF SY LF L.F 3 $ 1,200.00 $ 5,680 $ 3 25 $ 8,760 $ 1.75 205 $ 120.00 8,520 $ 36.00 2,160 $ 2.50 Sub Total Sub Total for Segment Paving Appurtenances (5%) Contingency (25%) Engineering (12%) Total Segment I Items: 0 $ 0 $ 0 $ 1,000 $ 165.00 7 $ 2,700.00 2,400 1,080 1,080 Contingency (25%) Engineering (12%) Subtotal Items: 32.00 29.00 45.00 Contingency (25%) Engineering (12%) Subtotal Items: 3,000.00 18,000.00 $ 15,000.00 $ 25,000.00 $ 307,000.00 $ 5,000.00 $ 373,000.00 $ 373,000.00 $ 19,000 00 $ 98,000.00 $ 59,000.00 $ 549,000.00 $ 165,000.00 $ 19,000.00 $ 46,000 00 $ 28,000.00 $ 258,000.00 $ 77,000.00 $ 31,000.00 $ 49,000 00 $ 39,000.00 $ 24,000.00 $ 220,000.00 1 Segment Total: $ 1,027,000.00 I 3/3/2014 Page C16 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 UNIT QTY Segment 1 UNIT PRICE TOTAL COST Segment 1 - Promenade: N. Spectrum to S. Spectrum Total Segment Length Existing Segment Length New Segment Length Paving BV -114-70 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) Roadway Excavation PAVING ITEMS 8 -inch stabilized subgrade Lime for Stabilization (7% per dry weight) 10 -inch Reinforced Concrete Pavement (71' B -B) 6 -inch Reinforced Concrete Curb Drainage Type "C -2A" Manholes 24 -inch Leads 48" X 84" RCB Water Sewer Electric Ductbank Street Light 1320 ft 0 ft 1320 ft AC CY SY. TON SY. L.F, 4 $ 1,200.00 $ 4,000.00 6,942 $ 3.25 $ 23,000.00 10,707 $ 1.75 251 $ 120.00 10,413 $ 36 00 2,640 $ 2.50 Sub Total $ 19,000.00 $ 30,000.00 $ 375,000.00 $ 7,000.00 $ 458,000.00 Sub Total for Segment Paving $ 458,000.00 EA. EA. L.F. L.F. LF LF Appurtenances (5%) Contingency (25%) Engineering (12%) Total Segment I Items: 4 2 140 600 $ 23,000.00 $ 120,000.00 $ 72,000.00 $ 673,000.00 $ 3,100.00 $ $ 3,500.00 $ $ 50.00 $ $ 315.00 $ 12,000.00 7,000.00 7,000.00 189,000.00 Sub Total ' $ 215,000.00 Appurtenances (15%) $ 32,000.00 Contingency (25%) $ 62,000.00 Engineering (12%) $ 37,000.00 Subtotal Items: $ 346,000.00 0 0 1,315 $ 165.00 $ 9 $ 2,700.00 $ 217,000 00 24,000 00 Contingency (25%) $ 60,000.00 Engineering (12%) $ 36,000.00 Subtotal Items: $ 337,000.00 Traffic Items Signalized Intersection EA. 1 $ 200,000.00 $ 200,000 00 3/3/2014 Page C17 of C34 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment UNIT QTY UNIT PRICE TOTAL COST Segment I - Promenade: N. Spectrum to S. Spectrum Streetscape Sidewalks Street Trees Irrigation Contingency (25%) $ 50,000.00 Engineering (12%) $ 30,000.00 Subtotal Items: $ 280,000.00 SY 2,933 $ 32.00 $ 94,000.00 LF. 1,320 $ 29.00 $ 38,000.00 L.F 1,320 $ 45.00 $ 59,000.00 Contingency (25%) $ 48,000.00 Engineering (12%) $ 29,000.00 Subtotal Items: $ 268,000.00 Segment Total: $ 1,904,000.00 3/3/2014 Page C18 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment J UNIT QTY UNIT PRICE TOTAL COST Segment J - Fruge: Promenade to S. Spectrum Drive (Curve) Total Segment Length 1580 ft Existing Segment Length 0 ft New Segment Length 1580 ft Paving RD -44-22 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) AC 2 $ 1,200 00 $ 2,000.00 Roadway Excavation CY 2,304 $ 3 25 $ 7,000.00 PAVING ITEMS 8 -inch stabilized subgrade SY 4,389 $ 1.75 $ 8,000.00 Lime for Stabilization (7% per dry weight) TON 103 $ 120 00 $ 12,000.00 8 -inch Reinforced Concrete Pavement (23' B -B) SY. 4,038 $ 26.00 $ 105,000.00 6 -inch Reinforced Concrete Curb L F, 3,160 $ 2.50 $ 8,000.00 Sub Total $ 142,000 00 Appurtenances (5%) $ 7,000.00 Contingency (25%) $ 37,000.00 Engineering (12%) $ 22 000 00 Total Phase I Items: $ 208,000.00 Drainage Type "C -2A" EA. 2 $ 3,100.00 $ 6,000.00 Manholes EA. 3 $ 3,500.00 $ 11,000.00 24 -inch Leads L.F. 50 $ 50.00 $ 3,000.00 48 -inch Sewer RCP L.F 1,418 $ 130.00 $ 184,000.00 Sub Total $ 204,000.00 Appurtenances (15%) $ 31,000.00 Contingency (25%) $ 59,000.00 Engineering (12%) $ 35,000.00 Subtotal Items: $ 329,000.00 Water 8" PVC Pipe LF. 1.580 $ 16.00 $ 25,000.00 Fire Hydrant EA. 4 $ 2,700.00 $ 11,000.00 8" Gate Valve EA. 2 $ 700.00 $ 1,000.00 Sub Total $ 37,000 00 Appurtenances (25%) $ 9,000.00 Contingency (25%) $ 12,000.00 Engineering (12%) $ 7,000 00 Subtotal Items: $ 65,000.00 Sewer 8" SDR -26 LF. 1,782 $ 22.00 $ 39,000.00 Sanitary Sewer Manhole (0-8') EA. 7 $ 2,000.00 $ 14,000.00 Extradepth Manhole VF 1 $ 100 00 $ 3/3/2014 Page C19 of C34 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment ! UNIT QTY UNIT PRICE TOTAL COST Segment J - Fruge: Promenade to S. Spectrum Drive (Curve) Trench Safety Systems LF 1,782 $ 0.50 $ 1,000.00 Sub Total $ 54,000.00 Appurtenances (10%) $ 5,000.00 Contingency (15%) $ 9,000.00 Engineering (12%) $ 8,000.00 Subtotal Items: $ 76,000.00 Electric Ductbank LF 1,582 $ 165.00 $ 261,000.00 Street Light LF 10 $ 2,700.00 $ 27,000.00 Contingency (25%) $ 72,000.00 Engineering (12%) $ 43,000.00 Subtotal Items: $ 403,000.00 Traffic Items Signalized Intersection EA 1 $ 200,000.00 $ 200,000.00 Streetscape Sidewalks Street Trees Irrigation Contingency (25%) $ 50,000.00 Engineering (12%) $ 30,000.00 Subtotal Items: $ 280,000.00 SY 2,107 $ 32 00 $ 67,000.00 LF. 1,580 $ 29.00 $ 46,000.00 L.F. 1,580 $ 45.00 $ 71,000.00 Contingency (25%) $ 46,000.00 Engineering (12%) $ 28,000.00 Subtotal Items: $ 258,000.00 Segment Total: $ 1,619,000.00 3/3/2014 Page C20 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment K UNIT QTY UNIT PRICE TOTAL COST Segment K - Promenade: S. Spectrum to Fruge Rd. Total Segment Length 1610 ft Existing Segment Length 0 ft New Segment Length 1610 ft Paving AV -94-48 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) AC 2 $ 1,200 00 $ 3,000.00 Roadway Excavation CY 3,876 $ 3.25 $ 13,000.00 PAVING ITEMS 8 -inch stabilized subgrade SY. 7,334 $ 1.75 $ 13,000.00 Lime for Stabilization (7% per dry weight) TON 172 $ 120 00 $ 21,000 00 8 -inch Reinforced Concrete Pavement (39' B -B) SY 6,977 $ 31.00 $ 216,000.00 6 -inch Reinforced Concrete Curb L.F, 3,220 $ 2.50 $ 8,000.00 Sub Total $ 274,000.00 Appurtenances (5%) $ 14,000.00 Contingency (25%) $ 72,000 00 Engineering (12%) $ 43,000.00 Total Phase I Items: $ 403,000.00 Drainage Type "C -2A" EA. 2 $ 3,100.00 $ 6,000.00 Manholes EA. 3 $ 3,500.00 $ 11,000.00 24 -inch Leads L.F. 50 $ 50.00 $ 3,000.00 42 -inch Sewer RCP L.F. 840 $ 100.00 $ 84,000.00 48 -inch Sewer RCP L.F. 1,464 $ 130.00 $ 190,000.00 Sub Total $ 294,000.00 Appurtenances (15%) $ 44,000.00 Contingency (25%) $ 85,000.00 Engineering (12%) $ 51,000.00 Subtotal Items: $ 474,000.00 Water 8" PVC Pipe LF 1,610 $ 16 00 $ 26,000.00 Fire Hydrant EA 4 $ 2,700 00 $ 11,000.00 8" Gate Valve EA 2 $ 700.00 $ 1,000.00 Sub Total $ 38,000.00 Appurtenances (25%) $ 10,000 00 Contingency (25%) $ 12,000 00 Engineering (12%) $ 6,000.00 Subtotal Items: $ 66,000.00 Sewer 10" SDR -26 LF 1,069 $ 33.00 $ 35,000.00 18" SDR -26 LF 1,142 $ 58.00 $ 66,000 00 3/3/2014 Page C21 of C34 DESCRIPTION Pate Engineers, Inc, 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment K UNIT QTY UNIT PRICE TOTAL COST Segment K - Promenade: S. Spectrum to Fruge Rd. Sanitary Sewer Manhole (0-8') EA 7 $ 2,000 00 $ 14,000.00 Extradepth Manhole VF 13 $ 100 00 $ 1,000.00 Trench Safety Systems LF 2,211 $ 0.50 $ 1,000.00 Sub Total $ 117,000.00 Appurtenances (10%) $ 12,000.00 Contingency (15%) $ 19,000 00 Engineering (12%) $ 18,000.00 Subtotal Items: $ 166,000.00 Electric Ductbank LF 1,607 $ 165.00 $ 265,000.00 Street Light LF 11 $ 2,700.00 $ 30,000.00 Traffic Items Signalized Intersection Streetscape Sidewalks Street Trees Irrigation Contingency (25%) $ 74,000.00 Engineering (12%) $ 44,000.00 Subtotal Items: $ 413,000.00 EA. 1 $ 200,000 00 $ 200,000.00 Contingency (25%) $ Engineering (12%) $ Subtotal Items: $ 50,000.00 30, 000.00 280,000.00 SY 3,936 $ 32.00 $ 126,000.00 LF. 1,610 $ 29.00 $ 47,000.00 L.F. 1,610 $ 45.00 $ 72,000.00 Contingency (25%) $ 61,000.00 Engineering (12%) $ 37,000.00 Subtotal Items: $ 343,000.00 Segment Total: $ 2,145,000.00 3/3/2014 Page C22 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment L UNIT QTY UNIT PRICE TOTAL COST Segment L - Fruge: Promenade to TXDOT Total Segment Length 760 ft Existing Segment Length 0 ft New Segment Length 760 ft Paving ST -62-38 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) AC. 1 $ 1,200.00 $ 1,000.00 Roadway Excavation CY. 1,830 $ 3.25 $ 6,000 00 PAVING ITEMS 8 -inch stabilized subgrade SY. 3,462 $ 1.75 $ 6,000 00 Lime for Stabilization (7% per dry weight) TON 81 $ 120.00 $ 10,000.00 8 -inch Reinforced Concrete Pavement (39' B -B) SY. 3,293 $ 31.00 $ 102,000.00 6 -inch Reinforced Concrete Curb L.F, 1,520 $ 2.50 $ 4,000 00 Drainage street drainage Sub Total $ 129,000.00 Appurtenances (5%) $ 6,000 00 Contingency (25%) $ 34,000.00 Engineering (12%) $ 20,000.00 Total Phase I Items: $ 189,000.00 LF 760 $ 60.00 $ 46,000.00 Appurtenances (15%) $ 7,000.00 Contingency (25%) $ 13,000.00 Engineering (12%) $ 8,000.00 Subtotal Items: $ 74,000.00 Water 8" PVC Pipe LF. 760 $ 16.00 $ 12,000.00 Fire Hydrant EA. 2 $ 2,700.00 $ 5,000.00 8" Gate Valve EA. 1 $ 700.00 $ 1,000 00 Sub Total $ 18,000.00 Appurtenances (25%) $ 5,000.00 Contingency (25%) $ 6,000.00 Engineering (12%) $ 3,000.00 Subtotal Items: $ 32,000.00 Sewer 10" SDR -26 LF. 1,036 $ 33.00 $ 34,000.00 18" SDR -26 LF. 1,142 $ 58.00 $ 66,000.00 Sanitary Sewer Manhole (0-8') EA. 5 $ 2,000.00 $ 10,000.00 Extradepth Manhole VF. 13 $ 100.00 $ 1,000.00 Trench Safety Systems LF. 2,178 $ 0 50 $ 1,000 00 Sub Total $ 112,000 00 3/3/2014 Page C23 of C34 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment L UNIT QTY UNIT PRICE TOTAL COST Segment L - Fruge: Promenade to TXDOT Appurtenances (10%) $ 11,000.00 Contingency (15%) $ 18,000.00 Engineering (12%) $ 17,000.00 Subtotal Items: $ 158,000.00 Electric Ductbank LF 756 $ 165.00 $ 125,000.00 Street Light LF 5 $ 2,700,00 $ 14,000.00 Contingency (25%) $ 35,000.00 Engineering (12%) $ 21,000.00 Subtotal Items: $ 195,000.00 Traffic Items Signalized Intersection EA 1 $ 200,000 00 $ 200,000.00 Contingency (25%) $ 50,000 00 Engineering (12%) $ 30,000.00 Subtotal Items: $ 280,000.00 Streetsca pe Sidewalks SY 2,027 $ 32.00 $ 65,000 00 Street Trees LF. 760 $ 29 00 $ 22,000.00 Irrigation L.F 760 $ 45.00 $ 34,000.00 Contingency (25%) $ 30,000.00 Engineering (12%) $ 18,000.00 Subtotal Items: $ 169,000.00 Segment Total: $ 1,097,000.00 3/3/2014 Page C24 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 UNIT QTY UNIT PRICE Segment M TOTAL COST Segment M - Fruge: TXDOT to Kirby Total Segment Length Existing Segment Length New Segment Length Paving ST -53-29 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) Roadway Excavation PAVING ITEMS 8 -inch stabilized subgrade Lime for Stabilization (7% per dry weight) 8 -inch Reinforced Concrete Pavement (39' B -B) 6 -inch Reinforced Concrete Curb Drainage Water 8" PVC Pipe Fire Hydrant 8" Gate Valve Sewer 18" SDR -26 Sanitary Sewer Manhole (0-8') Extradepth Manhole Trench Safety Systems Electric Ductbank 1150 0 1150 AC CY SY. TON SY. L.F, LF. EA. EA. LF. EA. VF. LF LF ft ft ft 2 $ 1,200.00 $ 2,769 $ 3.25 $ 5,239 123 4,983 2,300 $ 175 $ $ 120.00 $ $ 31.00 $ $ 2.50 $ Sub Total $ 2,000.00 9,000 00 9,000.00 15,000.00 154,000.00 6,000 00 195,000.00 Appurtenances (5%) $ 10,000.00 Contingency (25%) $ 51,000.00 Engineering (12%) $ 31,000.00 Total Phase I Items: $ 287,000.00 0 $ - $ 1,150 3 2 $ 16.00 $ 2,700.00 $ 700.00 Sub Total $ 18,000.00 $ 8,000.00 $ 1,000.00 $ 27,000.00 Appurtenances (25%) $ Contingency (25%) $ Engineering (12%) $ Subtotal Items: $ 1,186 3 12 1,186 7,000.00 9,000.00 5,000.00 48,000.00 $ 58.00 $ $ 2,000.00 $ $ 100.00 $ $ 0.50 $ Sub Total $ Appurtenances (10%) $ Contingency (15%) $ Engineering (12%) $ Subtotal Items: $ 69,000.00 6,000.00 1,000.00 1,000.00 77,000.00 8,000.00 21,000.00 13,000.00 119,000.00 1,145 $ 165.00 $ 189,000.00 3/3/2014 Page C25 of C34 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 UNIT QTY Segment M UNIT PRICE TOTAL COST Segment M - Fruge: TXDOT to Kirby Street Light Traffic Items Signalized Intersection Streetscape Sidewalks Street Trees Irrigation LF EA. SY LF. LF 8 $ 2,700.00 $ 22,000.00 Contingency (25%) $ 53,000.00 Engineering (12%) $ 32,000.00 Subtotal Items: $ 296,000.00 1 $ 200,000.00 $ 200,000.00 1,533 1,150 1,150 Contingency (25%) Engineering (12%) Subtotal Items: 32.00 29.00 45.00 Contingency (25%) Engineering (12%) Subtotal Items: $ 50,000.00 $ 30,000.00 $ 280,000.00 $ 49,000.00 $ 33,000.00 $ 52,000.00 $ 34,000.00 $ 20,000.00 $ 188,000.00 Segment Total: $ 1,218,000.00 3/3/2014 Page C26 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DATE: 10/21/11 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 UNIT QTY Segment N UNIT PRICE TOTAL COST Segment N - Fruge: Kirby to Hooper Total Segment Length Existing Segment Length New Segment Length Paving RD -44-22 Site Preparation (Clearing & Grubbing) Roadway Excavation PAVING ITEMS 8 -inch stabilized subgrade Lime for Stabilization (7% per dry weight) 10 -inch Reinforced Concrete Pavement (23' B -B) 6 -inch Reinforced Concrete Curb Drainage street drainage Water 8" PVC Pipe Fire Hydrant 8" Gate Valve Sewer 10" SDR -26 Sanitary Sewer Manhole (0-8') Extradepth Manhole Trench Safety Systems 1200 0 1200 AC CY. SY. TON SY. LF, ft ft ft 1 $ 1,200.00 $ 1,000.00 1,750 $ 3.25 $ 6,000.00 3,333 78 3,067 2,400 $ 175 $ $ 120.00 $ $ 26.00 $ $ 250 $ 6,000 00 9,000.00 80,000.00 6,000 00 Sub Total $ 108,000.00 Appurtenances (5%) $ 5,000 00 Contingency (25%) $ 28,000 00 Engineering (12%) $ 17,000.00 Total Phase I Items: $ 158,000.00 LF 1,200 $ 60.00 $ 72,000.00 LF. EA. EA. LF EA VF. LF Appurtenances (15%) $ 11,000.00 Contingency (25%) $ 21,000.00 Engineering (12%) $ 12,000.00 Subtotal Items: $ 116,000.00 1,200 3 2 $ 16.00 $ $ 2,700.00 $ $ 700 00 $ 19,000.00 8,000.00 1,000.00 Sub Total $ 28,000 00 Appurtenances (25%) $ 7,000 00 Contingency (25%) $ 9,000 00 Engineering (12%) $ 5,000.00 Subtotal Items: $ 49,000.00 1,250 5 13 1,250 $ 33.00 $ $ 2,000.00 $ $ 100.00 $ $ 0 50 $ 41,000.00 10,000.00 1,000.00 1,000 00 Sub Total $ 53,000.00 Appurtenances (10%) $ 5,00000 Contingency (15%) $ 15,000.00 3/3/2014 Page C27 of C34 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment N UNIT QTY UNIT PRICE TOTAL COST Segment N - Fruge: Kirby to Hooper Engineering (12%) $ 9,000.00 Subtotal Items: $ 82,000.00 Electric Ductbank LF 1,195 $ 165.00 $ 197,000.00 Street Light LF 8 $ 2,700.00 $ 22,000.00 Contingency (25%) $ 55,000.00 Engineering (12%) $ 33,000.00 Subtotal Items: $ 307,000.00 Traffic Items Signalized Intersection EA 1 $ 200,000.00 $ 200,000.00 Streetscape Sidewalks Street Trees Irrigation Contingency (25%) $ 50,000.00 Engineering (12%) $ 30,000.00 Subtotal Items: $ 280,000.00 SY 1,600 $ 32.00 $ 51,000.00 LF. 1,200 $ 29.00 $ 35,000.00 L.F 1,200 $ 45.00 $ 54,000.00 Contingency (25%) $ 35,000.00 Engineering (12%) $ 21,000.00 Subtotal Items: $ 196,000.00 Segment Total: $ 1,030,000.00 3/3/2014 Page C28 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment 0 UNIT QTY UNIT PRICE TOTAL COST Segment 0 - Hooper: Beltway 8 to N. Spectrum Total Segment Length 3650 ft Existing Segment Length 0 ft New Segment Length 3650 ft RD -44-22 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) AC. 4 $ 1,200.00 $ 4,000 00 Roadway Excavation CY 5,322 $ 3.25 $ 17,000.00 PAVING ITEMS 8 -inch stabilized subgrade SY. 10,139 $ 1.75 $ 18,000.00 Lime for Stabilization (7% per dry weight) TON 238 $ 120.00 $ 29,000.00 10 -inch Reinforced Concrete Pavement (23' B -B) SY. 9,328 $ 26.00 $ 243,000 00 6 -inch Reinforced Concrete Curb L.F, 7,300 $ 2.50 $ 18,000.00 Sub Total $ 329,000 00 Appurtenances (5%) $ 16,000.00 Contingency (25%) $ 86,000.00 Engineering (12%) $ 52,000.00 Total Phase I Items: $ 483,000.00 Drainage Type "C -2A" EA. 8 $ 3,100.00 $ 25,000.00 Manholes EA. 5 $ 3,500.00 $ 18,000.00 24 -inch Leads L.F. 104 $ 50.00 $ 5,000.00 48 -inch Sewer RCP L.F. 3,500 $ 130.00 $ 455,000.00 54 -inch Sewer RCP L.F. 2,692 $ 175.00 $ 471,000.00 Sub Total $ 974,000.00 Appurtenances (15%) $ 146,000.00 Contingency (25%) $ 280,000.00 Engineering (12%) $ 168,000.00 Subtotal Items: $ 1,568,000.00 Water 8" PVC Pipe LF 3,650 $ 16.00 $ 58,000.00 Fire Hydrant EA 8 $ 2,700.00 $ 22,000.00 8" Gate Valve EA 4 $ 700.00 $ 3,000.00 Sub Total $ 83,000.00 Appurtenances (25%) $ 21,000.00 Contingency (25%) $ 26,000.00 Engineering (12%) $ 16,000 00 Subtotal Items: $ 146,000.00 Sewer 8" SDR -26 LF 1,204 $ 22.00 $ 26,000 00 10" SDR -26 LF 2,650 $ 33.00 $ 87,000 00 12" SDR -26 LF 1.307 $ 35.00 $ 46,000.00 3/3/2014 Page C29 of C34 Segment Total: $ 4,276,000.00' DESCRIPTION Pate Engineers, inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment 0 UNIT QTY UNIT PRICE TOTAL COST Segment 0 - Hooper: Beltway 8 to N. Spectrum Sanitary Sewer Manhole (0-8') EA. 14 $ 2,000 00 $ 28,000.00 Extradepth Manhole VF. 35 $ 100 00 $ 4,000 00 Trench Safety Systems LF. 5,161 $ 0 50 $ 3,000 00 Sub Total $ 194,000 00 Appurtenances (10%) $ 19,000.00 Contingency (15%) $ 32,000 00 Engineering (12%) $ 29.000.00 Subtotal Items: $ 274,000.00 Electric Ductbank LF 3,645 $ 165 00 $ 601,000.00 Street Light LF 23 $ 2,700.00 $ 62,000.00 Traffic Items Signalized Intersection Streetscape Sidewalks Street Trees Irrigation Contingency (25%) $ 166,000.00 Engineering (12%) $ 99,000.00 Subtotal Items: $ 928,000.00 EA. 1 $ 200,000 00 $ 200,000 00 Contingency (25%) $ 50,000.00 Engineering (12%) $ 30,000 00 Subtotal Items: $ 280,000.00 SY 4,867 $ 32.00 $ 156,000.00 LF. 3,650 $ 29.00 $ 106,000.00 L.F. 3,650 $ 45.00 $ 164,000.00 Contingency (25%) $ 107,000.00 Engineering (12%) $ 64,000.00 Subtotal Items: $ 597,000.00 1 3/3/2014 Page C30 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment P UNIT QTY UNIT PRICE TOTAL COST Segment P - Hooper: N. Spectrum to Fruge Rd. Total Segment Length 1540 ft Existing Segment Length 0 ft New Segment Length 1540 ft RD -44-22 EARTHWORK AND SITE PREPARATION ITEMS Site Preparation (Clearing & Grubbing) AC 2 $ 1,200.00 $ 2,000.00 Roadway Excavation CY 2,246 $ 3.25 $ 7,000.00 PAVING ITEMS 8 -inch stabilized subgrade SY. 4,278 $ 1.75 $ 7,000.00 Lime for Stabilization (7% per dry weight) TON 100 $ 120.00 $ 12,000.00 10 -inch Reinforced Concrete Pavement (23' B -B) SY. 3,936 $ 26.00 $ 102,000.00 6 -inch Reinforced Concrete Curb L.F, 3,080 $ 2.50 $ 8,000.00 Sub Total $ 138,000.00 Appurtenances (5%) $ 7,000.00 Contingency (25%) $ 36,000.00 Engineering (12%) $ 22,000.00 Total Phase I Items: $ 203,000.00 Drainage Type "C -2A" EA. 2 $ 3,100.00 $ 6,000.00 Manholes EA. 2 $ 3,500.00 $ 7,000.00 24 -inch Leads L.F. 36 $ 50.00 $ 2,000.00 42 -inch Sewer RCP L.F. 700 $ 100.00 $ 70,000.00 Sub Total $ 85,000.00 Appurtenances (15%) $ 13,000.00 Contingency (25%) $ 25,000.00 Engineering (12%) $ 15,000.00 Subtotal Items: $ 138,000.00 Water 8" PVC Pipe LF. 1,540 $ 16.00 $ 25,000.00 Fire Hydrant EA. 4 $ 2,700.00 $ 11,000.00 8" Gate Valve EA 2 $ 700 00 $ 1,000.00 Sub Total $ 37,000.00 Appurtenances (25%) $ 9,000.00 Contingency (25%) $ 12,000.00 Engineering (12%) $ 7,000.00 Subtotal Items: $ 65,000.00 Sewer 8" SDR -26 LF 1,602 $ 22.00 $ 35,000.00 Sanitary Sewer Manhole (0-8') EA. 4 $ 2,000.00 $ 8,000.00 Extradepth Manhole VF. 3 $ 100.00 $ Trench Safety Systems LF 1,602 $ 0.50 $ 1,000.00 3/3/2014 Page C31 of C34 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Segment P UNIT QTY UNIT PRICE TOTAL COST Segment P - Hooper: N. Spectrum to Fruge Rd. Sub Total $ 44,000.00 Appurtenances (10%) $ Contingency (15%) $ Engineering (12%) $ Subtotal Items: $ 4,000.00 7,000.00 7, 000.00 62,000.00 Electric Ductbank LF 1,536 $ 165.00 $ 253,000.00 Street Light LF 10 $ 2,700.00 $ 27,000.00 Streetscape Sidewalks Street Trees Irrigation Contingency (25%) $ 70,000.00 Engineering (12%) $ 42,000.00 Subtotal Items: $ 392,000.00 SY 2,053 $ 32.00 $ 66,000.00 LF 1,540 $ 29.00 $ 45,000.00 L.F. 1,540 $ 45.00 $ 69,000.00 Contingency (25%) $ 45,000.00 Engineering (12%) $ 27,000.00 Subtotal Items: $ 252,000.00 Segment Total: $ 1,112,000.00 3/3/2014 Page C32 of C34 LOWER KIRBY URBAN CORE CONSTRUCTION COST ESTIMATE DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 UNIT QTY Detention UNIT PRICE TOTAL COST Detention Pond 1 Detention Pond Excavation Outfall (15% of Excavation) Backslope Interceptor Backslope swale Detention Pond 2 Detention Pond Excavation Outfall (15% of Excavation) Backslope Interceptor Backslope swale Bridge @ AV -82-44 Bridge @ BV -114-70 Signature Bridge Land Acquisition Detention Pond 3 Detention Pond Excavation Outfall (15% of Excavation) Backslope Interceptor Backslope swale Land Acquisition CY EA, EA L.F. 309,760 1 4 2,500 $ 5.00 $ $ 232,000.00 $ $ 5,000 00 $ $ 3 50 $ 1,549,000 00 232,000 00 20, 000.00 9,000.00 Appurtenances (25%) $ 453,000.00 Contingency (25%) $ 566,000.00 Engineering (12%) $ 339,000.00 Subtotal Detention Pond 1 Items: $ 3,166,000.00 C Y 118,653 $ 5 00 EA. 1 $ 89,000 00 EA. 11 $ 5,000 00 L.F. 7,700 $ 3 50 S F 12,300 $ 75.00 S.F, 12,300 $ 75.00 S.F. 12,300 $ 75.00 S.F. 1,002,127 $ 2.25 $ 593,000.00 $ 89,000.00 $ 55,000 00 $ 27,000.00 $ 923,000 00 $ 923,000.00 $ 923,000.00 $ 2,255,000.00 Appurtenances (25%) $ 883,000.00 Contingency (25%) $ 1,104,000.00 Engineering (12%) $ 662,000.00 Subtotal Detention Pond 2 Items: $ 8,437,000.00 CY EA, EA. L.F. S.F, 123,233 1 3 2,230 615,806 $ 5.00 $ 92,000.00 $ 5,000.00 $ 3 50 $ 2 25 $ 616,000 00 $ 92,000 00 $ 15,000.00 $ 8,000.00 $ 1,386,000 00 Appurtenances (25%) $ 183,000.00 Contingency (25%) $ 229,000.00 Engineering (12%) $ 137.000 00 Subtotal Detention Pond 3 Items: $ 2,666,000.00 Detention Pond 4 Detention Pond Excavation C Y 149,334 $ 5.00 $ 747,000.00 3/3/2014 Page C33 of C34 DESCRIPTION Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 Detention UNIT QTY UNIT PRICE TOTAL COST Outfall (5% of Excavation) EA 1 $ 37,000.00 $ 37,000.00 Backslope Interceptor EA 3 $ 5,000.00 $ 15,000.00 Backslope swaie L.F. 1,600 $ 3.50 $ 6,000.00 Land Acquisition S.F 651,587 $ 2.25 $ 1,466,000.00 Appurtenances (25%) $ 201,000.00 Contingency (25%) $ 252,000.00 Engineering (12%) $ 151,000.00 Subtotal Detention Pond 4 Items: $ 2,875,000.00 3/3/2014 Page C34 of C34 Pate Engineers, Inc. 13333 Northwest Freeway, Suite 300 Houston, Texas 77040 (713) 462-3178 LOWER KIRBY URBAN CORE DETENTION SUMMARY CONSTRUCTION COST ESTIMATE DATE: 10/21/11 Name Cost Detention Pond 1 $ 3,168,000.00 Detention Pond 2 $ 8,437,000.00 Detention Pond 3 $ 2,666,000.00 Detention Pond 4 $ 2,875,000.00 Total $ 17,146,000.00 Total Roadway Segments $ 31,606,000.00 Total Detention $ 17,146,000.00 Total Cost $ 48,752,000.00 3/3/2014 Page C1 of Cl CERTIFICATION OF MASTER DRAINAGE PLAN FOR DEVELOPMENT IN THE DISTRICT WHEREAS, Lower Kirby Pearland Management District (the "District"), formerly known as Spectrum Management District, was created as a municipal management district under Article XVI, Section 59, and Article III, Sections 52 and 52-a, Texas Constitution; WHEREAS, the District operates under Chapter 3840, Texas Special District Local Laws Code; Chapter 375, Texas Local Government Code; and Chapters 49 and 54, Texas Water Code, and is authorized to engage in drainage and flood control activities; WHEREAS, pursuant to Section 49.211, Texas Water Code, the District has commissioned a master drainage plan, including rules related to the plan and design criteria for drainage channels, facilities, and flood control improvements, and certain rules related to construction activity within the District; WHEREAS, in order to accomplish the purposes for which the District was created, the District has determined to establish a master drainage plan for the entire 903 acres, which is the total acreage located within the District boundaries; WHEREAS, the Board of Directors deems it necessary to adopt rules, regulations and fees necessary for the implementation and enforcement of a master drainage plan. NOW, THEREFORE, the Board of Directors for the District hereby certifies that Phase I of the Master Drainage Plan attached hereto has been received, reviewed and is hereby adopted. CERTIFIED this day ofcC,\p+MQ.(J , 2014. President, f3 Secretary, Board- f `Directors M (SEAL) = 472492 and o Exhibit C LJA Engineering, Inc. IA Clear Creek Harris County Flood Control Unit No. A100-00-00 Drainage Design and Impact Analysis for Lower Kirby Regional Detention Facility July 2013 Planners ! Consulting Englneers * Surveyors Clear Creek Harris County Flood Control Unit No. A100-00-00 Drainage Design and Impact Analysis for Lower Kirby Regional Detention Facility ....0>NVAtitamm: ***IP .44. c.:••• *: • e .-A 1() g ROBERT R. BARON 9003% 93810 /1,%j•.„ ititA\e•/CENS-. 111.5`,3'/A. ..... '144 July 2013 LJA Engineering, Inc 2929 Briarpark Dr., Suite 600 Houston, Texas 77042-3703 Phone 713.953.5200 Fax 713.953.5026 LJA Firm Registration No. F-1386 LJA Job No. 1607-1102 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility TABLE OF CONTENTS Executive Summary Page ES -1 1.0 Introduction Page 1-1 1.1 Site Location and Description Page 1-1 1.2 Existing Drainage Page 1-1 1.3 Regulatory Jurisdictions Page 1-2 1.4 Project Datum Page 1-2 1.5 Previous Studies Page 1-2 1.5.1 Promenade Shops Development Page 1-2 1.5.2 Promenade Regional Detention Analysis Page 1-3 1.5.3 Water Lights Master Drainage Plan Page 1-3 1.5.4 Letter of Map Revision — Fill for Goldknight Tracts Page 1-4 1.6 Proposed Lower Kirby Regional Development and Detention Facilitiy Page 1-4 2.0 Hydrologic Analysis Page 2-1 2.1 Methodology Page 2-1 2.1.1 Watershed Characteristics Page 2-1 2.1.2 Precipitation Abstractions Page 2-2 2.1.3 Hypothetical Storm Events Page 2-2 2.1.4 Rainfall Distributions Page 2-2 2.2 Detention Requirements Page 2-2 2.3 Base Conditions Page 2-3 2.4 Revised Base Model Page 2-4 2.4.1 Storage Routing Page 2-4 2.4.2 Kirby Drive Bridge Page 2-4 2.5 Pre Project Model Page 2-5 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility 2.5.1 Subdivided Al00F Page 2-5 2.5.2 Subdivided Routing Reach 2199R Page 2-6 2.5.3 Runoff from Beltway 8 Page 2-6 2.5.4 Tc&R Values Page 2-6 2.6 Post Project Hydrology — Lower Kirby Detention Facility Page 2-7 2.7 Post Project Hydrology — Clear Creek Page 2-9 3.0 Hydraulic Analysis Page 3-1 3.1 Lower Kirby Regional Detention Facility Page 3-1 3.1.1 Detention Facility Modeling Page 3-1 3.1.2 Stage -Area Nodes Page 3-1 3.1.3 Boundary Nodes Page 3-2 3.1.4 Pipes Page 3-2 3.2 Clear Creek Page 3-3 3.2.1 Base Conditions HEC -RAS Page 3-3 3.2.2 Revised Base HEC -RAS Page 3-3 3.2.3 Pre Project HEC -RAS Page 3-4 3.2.4 Post Project HEC -RAS Page 3-5 4.0 Results and Conclusions Page 4-1 4.1 Hydrology Results Page 4-1 4.2 Mitigation Results Page 4-2 4.3 Hydraulic Results Page 4-3 4.4 Conclusions Page 4-4 ii Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility LIST OF TABLES TABLE ES -1 Lower Kirby Regional Peak Flow Comparisons Page ES -2 TABLE ES -2 Clear Creek Peak Flow Comparisons Page ES -2 TABLE ES -3 Required Storage Volume Summary Page ES -3 TABLE ES -4 Available Storage Volume Page ES -3 TABLE ES -5 Clear Creek Water Surface Elevation Comparisons Page ES -4 TABLE 2.1 Base Condition Watershed Parameters Page 2-3 TABLE 2.2 Base Condition Tc&R Values Page 2-3 TABLE 2.3 Base Condition Peak Flows Page 2-3 TABLE 2.4 Revised Base Peak Flow Comparisons Page 2-5 TABLE 2.5 Pre Project Condition Tc&R Parameters Page 2-6 TABLE 2.6 Pre Project Condition Tc&R Page 2-7 TABLE 2.7 Pre Project Peak Flow Comparisons Page 2-7 TABLE 2.8 Lower Kirby Regional Internal Tc&R Parameters Page 2-8 TABLE 2.9 Lower Kirby Regional Internal Tc&R Values Page 2-9 TABLE 2.10 Post Project Condition Tc&R Parameters Page 2-9 TABLE 2.11 Post Project Condition Tc&R Values Page 2-10 TABLE 3.1 Lower Kirby Regional Detention Facility System Page 3-3 TABLE 3.3 Pre Project Condition Water Surface Elevations Page 3-4 TABLE 3.4 Post Project Condition Water Surface Elevations Page 3-6 TABLE 4.1 Lower Kirby Regional Peak Flow Comparisons Page 4-1 TABLE 4.2 Clear Creek Peak Flow Comparisons Page 4-1 TABLE 4.3 Required Storage Volume Summary Page 4-2 TABLE 4.4 Available Storage Volume Page 4-2 TABLE 4.5 Clear Creek Water Surface Elevations Page 4-3 iii Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility LIST OF EXHIBITS Exhibit 1.1 Vicinity Map Following Page 1-6 Exhibit 1.2 Existing Drainage Following Page 1-6 Exhibit 1.3 FEMA Effective Special Flood Hazard Area Following Page 1-6 Exhibit 1.4 Lower Kirby Regional Development Plan Following Page 1-6 Exhibit 2.1 Clear Creek Watershed Following Page 2-10 Exhibit 2.2 Pre Project Clear Creek Sub -Watersheds Following Page 2-10 Exhibit 2.3 Lower Kirby Regional Internal Drainage Areas (Scenario 1) Following Page 2-10 Exhibit 3.1 ICPR Schematic Following Page 3-6 LIST OF APPENDICES Appendix A Models and Supporting Data on Disk Appendix B Agreement Exhibits iv Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility EXECUTIVE SUMMARY The Lower Kirby Regional Detention Facility is part of the Lower Kirby Urban Center in the City of Pearland that consists of approximately 1,000 acres of mostly undeveloped land at the southwest quadrant of State Highway 288 (SH 288) and Beltway 8. The Lower Kirby Regional Detention Service Area makes up approximately 467 acres of the Lower Kirby Urban Center. In order to reclaim land from the effective 100 -year floodplain and accommodate a more urban development, the City of Pearland is proposing a regional approach to detention for the 467 acre service area. This is a preferred alternative to individual developments providing onsite detention. Four ponds are proposed that will provide the necessary detention for development and floodplain mitigation. An existing borrow pit located adjacent to the north bank of Clear Creek will be improved to provide the required storage volume for the proposed development. Additionally, the TxDOT ditch providing drainage for Beltway 8 will be improved into three linear lakes that will provide additional storage volume, as well as a surplus volume of storage for possible use when SH 288 is improved. The 128 acre Prudential Tract located in the northeast quadrant of the Lower Kirby Regional Service Area is currently only partially developed. A Bass Pro Shops retail center was constructed and onsite detention was provided within the property. Numerous additional development plans for the Prudential Tract have been investigated but were never implemented. There were plans for expanding the Promenade Shops with additional retail, but these have also been put on hold.' Since it is unknown what future development will occur within the Prudential Property, a previous study investigated three development scenarios and proposed a regional detention plan for each one. The development scenarios are based on future development of the Prudential Tract and participation in the regional detention. The development scenarios are summarized below: • Scenario 1 — full participation of the Promenade Shops in the regional detention plan. • Scenario 2 — partial participation of the Promenade Shops in the regional detention plan. • Scenario 3 — no participation of the Promenade Shops in the regional detention plan. This report focuses on Scenario 1. Results of a hydrologic analysis indicate that, for the preferred development scenario, the peak 100 -year undetained flow from the Lower Kirby Development is approximately 2,331 cfs, but is limited to approximately 715 cfs according to a Lower Kirby Urban Center Master Plan and Implementation Strategy H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page ES -1 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility pre project HEC -HMS model. The proposed detention system for The Lower Kirby Development produces a peak 100 -year flow of 477 cfs from the detention facility, which is Tess than the maximum allowable rate. The 10 -year HEC -HMS results conclude that the peak discharge from the detention facility does not exceed the allowable peak flow as well. Table ES -1 summarizes the peak discharges for The Lower Kirby Development. TABLE ES -1 LOWER KIRBY REGIONAL PEAK FLOW COMPARISONS Storm Event Allowable Q (cfs) 366 Un -detained Q (cfs) 1,494 Detained 0 (cfs) 204 10 -yr 100 -yr 715 2,331 477 To incorporate the proposed Lower Kirby Development into the Clear Creek Watershed, post project flows were routed through detention using ICPR using a variable tailwater boundary condition. Results of the post project HEC -HMS model at selected points along Clear Creek are compared to the pre project HEC -HMS results in Table ES -2 below. CLEAR TABLE ES -2 CREEK PEAK FLOW COMPARISONS HEC -HMS Node HEC -RAS SECNO Description 10% Peak (cfs) Pre Project 484 Flow Post Project 484 1%Peak (cfs) Pre Project 1099 Flow Post Project 1099 Pre Project Post 10% 0 vs Proiect 1 0 2385J 239967.4 2228J 231533.3 1148 1148 2662 2662 0 0 2199J 222868.7 1148 1148 2662 2662 0 0 2143J 214705.8 1934 1884 3922 3849 -50 -73 1999J 197996.2 2240 2223 4359 4292 -17 -66 1660J 179278.5 Hickory 2910 2910 2905 2905 5443 5443 5433 5433 -5 -5 -11 -11 1601J 165983.9 1271J 129631 A120-00-00 4340 4339 7679 7675 -2 -4 1222J 123196.7 A119-00-00 7718 7717 13312 13308 -1 -4 1052J 106343.5 Mary's 10071 10070 17037 17034 22172 -1 -1 -4 0927J 93497.69 Cowart 12892 12891 22176 -4 0771J 77642.36 72765.55 Chigger Magnolia 14379 14755 14377 14753 24474 25242 24471 25239 -1 -1 -4 0702J -4 0601J 61501.83 14757 14756 25244 25241 -1 -4 0556J 55615.42 15332 15331 26212 26209 -1 -3 0366J 36556.81 A107-00-00 15356 15355 26239 26237 -1 -3 0301J 30794.12 15576 15574 26591 26588 -1 -3 0184J 20859.46 Armand 17123 17122 39144 39144 -1 0 0140J 16112.37 A104-00-00 17705 17705 42985 42985 0 0 The proposed Lower Kirby Development is located along the left (north) overbank of Clear Creek between SH 288 and Kirby Drive. The floodplain volume in the left overbank of Clear Creek was calculated in HEC -RAS for existing and proposed conditions, and the difference in volume is the volume of displacement from the proposed 271 acres that will be filled to reclaim H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page ES -2 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility land from the Clear Creek SFHA. The resulting volume of floodplain storage displaced below the 100 -year BFE is 158 acre-feet. Approximately 304 acre-feet of storage is required to detain the developed flows from the Lower Kirby Development, this volume produces a detention rate of 0.65 acre -ft per acre, which is the minimum allowable detention volume for the City of Pearland The total volume of detention for the development of the 467 acre Lower Kirby Tract is 462 ac -ft. Table ES -3 summarizes the results of the required detention volumes for the Lower Kirby Development for each scenario. TABLE ES -3 REQUIRED STORAGE VOLUME SUMMARY Service Area Development (ac -ft) Floodplaln Storage (ac -ft) 158 Total (ac -ft) 462 (ac) 467 304 Average Area (ac) 2.45 Volume (ac ft) 28.96 A100F3A 44.68 ICPR results included the maximum water surface elevations and corresponding surface area in each of the modeled detention facilities. Using this data, the available storage volume can be calculated. These results are shown in Table ES -4. TABLE ES -4 AVAILABLE STORAGE VOLUME Lake ID Normal Pool Elevation 1 (ft) Min. Lake Area (acres) Max. Lake Area (acres) 4.40 1 Max WSEL (ft) 56.50 Min. 1 WSEL (ft) 44.68 Depth (ft) 11.82 Average Area (ac) 2.45 Volume (ac ft) 28.96 A100F3A 44.68 0.50 A100F3B 44.22 0.65 6.02 56.50 44.22 12.28 3.34 40.95 A100F3C 44.10 4.50 12.02 56.50 44.10 12.40 8.26 102.42 A100F3D 44.00 27.55 31.74 54.00 44.00 10.00 29.65 296.50 Total Detention Storage Provided= 468.83 NAVD 1988, 2001 adj. The total storage available in the proposed ponds will provide adequate volume necessary for the total required detention if built as recommended in this report. A surplus storage volume of 6.8 acre-feet is also available, which can be utilized by TxDOT for future SH 288 improvements, or any other roadway improvement in this vicinity2 should TxDOT require the additional storage. The flows produced by the post project HEC -HMS model were entered into a post project HEC - RAS model and the resulting water surface elevations were compared to the pre project elevations. Table ES -5 shows the results and comparisons of the 10- and 100 -year flows. H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page ES -3 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility CLEAR TABLE ES -5 CREEK WATER SURFACE ELEVATION COMPARISONS HEC SECNO Description Water Surface Elevation 10 -Year 100 -Year Pre Proj Post Diff Pre Proj Prot Diff 211277.7 Upstream of Cullen Blvd 50.49 50.48 -0.01 51.11 51.10 -0.01 212049.2 50.91 50.88 -0.03 51.53 51.52 -0.01 212735.5 51.14 51.10 -0.04 51.69 51.68 -0.01 213290.6 51.34 51.30 -0.04 51.90 51.89 -0.01 213801.7 51.54 51.50 -0.04 52.16 52.14 -0.02 214705.8 215408.2 51.81 51.77 51.81 -0.04 52.46 52.45 -0.01 51.85 -0.04 52.52 52.51 -0.01 216257.9 51.88 51.84 -0.04 52.57 52.56 -0.01 216969 51.92 51.88 -0.04 52.63 52.62 -0.01 217869.1 52.00 51.96 -0.04 52.75 52.74 -0.01 218474 52.17 52.13 -0.04 52.99 52.98 -0.01 219197.5 52.62 52.60 -0.02 53.43 53.43 0.00 219890.1 53.08 53.07 -0.01 53.94 53.94 0.00 220697.2 53.47 53.46 -0.01 54.33 54.33 0.00 221401.5 53.60 53.59 -0.01 54.47 54.47 0.00 222149.2 53.74 53.73 -0.01 54.65 54.65 0.00 222868.7 54.09 54.08 -0.01 55.26 55.26 0.00 223445.1 54.19 54.19 0.00 55.45 ® 0.00 223455 SH 288 223668.1 54.21 54.21 0.00 55.58 55.58 0.00 224031.4 54.22 55.05 54.21 54.61 -0.01 -0.44 55.61 56.38 55.61 0.00 225035.7 56.05 -0.33 225542.2 55.16 54.71 -0.45 56.44 56.14 -0.30 226430.5 55.30 54.96 -0.34 56.50 56.33 -0.17 227358.8 55.55 55.46 -0.09 56.62 56.62 0.00 228044.5 55.70 55.56 -0.14 56.77 56.76 -0.01 228828.4 56.21 55.81 -0.40 57.33 57.13 -0.20 228950 Kirby Drive 56.36 56.00 -0.36 57.69 57.55 -0.14 229073.3 229428.1 56.45 56.11 -0.34 57.79 57.67 -0.12 230159.2 56.82 56.70 -0.12 58.01 57.92 -0.09 230878.1 56.99 56.90 -0.09 58.12 58.04 -0.08 231533.3 57.09 57.02 -0.07 58.21 58.13 -0.08 232232.1 57.20 57.15 -0.05 58.29 58.21 -0.08 232999.9 57.36 57.33 57.71 58.34 -0.03 -0.01 0.00 58.34 58.48 58.73 58.29 58.46 58.71 -0.05 -0.02 -0.02 233734.5 234420.7 57.72 D/S Almeda School Rd 58.34 The impact of the projected development of approximately 467 acres of land, including floodplain reclamation will require detention to mitigate the increased runoff from development and to compensate for floodplain storage and conveyance loss as a result of filling the floodplain. A proposed regional detention system will detain the increased rainfall runoff from the development and provide floodplain storage and conveyance mitigation to replace the storage lost due to reclaiming the area in the floodplain. With the implementation of the H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page ES -4 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility detention system and the compensatory excavation discussed above, the proposed changes to the Clear Creek Floodplain will be in accordance with National Flood Insurance Program (NFIP) regulations and will not adversely impact the Clear Creek Watershed. The proposed project has no impact to existing flood hazard conditions for storm events up to and including the 100 -year event. For development to occur orderly and economically, proper planning is essential. The drainage analysis presented in this report shows that proposed development of the Lower Kirby Tract is feasible from a drainage perspective. The proposed design will convey the rainfall runoff to the outfall channels, which will not be adversely affected if the required detention is provided for the development. H:11607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page ES -5 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility 1.0 INTRODUCTION The Lower Kirby Regional Detention Facility (Lower Kirby) is part of the Lower Kirby Urban Center in the City of Pearland. The Lower Kirby Urban Center consists of approximately 1,000 acres of mostly undeveloped land at the southwest quadrant of State Highway 288 (SH 288) and Beltway 8.2 The Lower Kirby Regional Detention Service Area makes up approximately 467 acres of the Lower Kirby Urban Center as shown in the figure below. 1.1 Site Location and Description The 467 acre Lower Kirby regional detention service area consists of the 128 acre Prudential Tract and approximately 339 acres of mostly undeveloped or rural area in southern Harris County, Texas, 12 miles south of downtown Houston as shown on Exhibit 1.1. The area is in the City of Pearland City Limits and Harris County; bound by Beltway 8 to the north, SH 288 to the east, Kirby Drive and Hooper Road to the west, and Clear Creek to the south. Soils in the area are mostly Lake Charles clay or Bernard clay loam that is represented by Soil Conservation Service (SCS) soil Group D. Low permeability and slow surface runoff potential characterize these soils. Annual rainfall averages 45 inches with periods of intense rainfall associated with tropical storms and localized thunderstorms occurring frequently throughout the year. As part of the Gulf Coast plain, the land is characterized by extremely flat topography. LiDAR information shows average natural ground elevations ranging from 54 feet to 58 feet (NAVD 1988, 2001 adj) across the area. Ground cover in the tract consists of flat pasture land with minimal natural channel conveyance for runoff. 1.2 Existing Drainage Natural drainage is mainly in the form of sheet flow that travels southward toward Clear Creek. An existing partially improved Texas Department of Transportation (TxDOT) ditch that bisects the tract conveys runoff from the Beltway 8 Right of Way (ROW) south into Clear Creek. This 2 Lower Kirby Urban Center Master Plan and Implementation Strategy H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 1-1 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility ditch is planned to be improved for drainage of the future Lower Kirby development as well as future improvements to SH 288. An existing pond south of Lower Kirby that was once used as a borrow pit will also be improved to provide detention for the Lower Kirby Development. The Kirby Drive corridor drains into the TxDOT ditch through a large man made drainage channel. An existing Bass Pro Shops retail center, which is part of the 128 acre Prudential Tract, drains into Clear Creek through a system of detention ponds, channels, and closed conduit pipe before ultimately entering Clear Creek adjacent to SH 288. Exhibit 1.2 illustrates the various existing drainage features within the Lower Kirby site. Clear Creek forms the south boundary of the Lower Kirby development and is the only flooding source within the facility. Clear Creek has a wide floodplain with shallow flooding along the overbank reaches. The project area is located on the FEMA FIRM Panel Number 4820101010 L for Harris County, Texas dated June 18, 2007. The effective floodplain and floodway affecting the Tract is shown in Exhibit 1.3. The majority of Lower Kirby lies in the 100 -year Special Flood Hazard Area (SFHA). Effective base flood elevations (BFE) range from approximately 56.0 feet (NAVD 1988, 2001 adj) at the eastern boundary of the tract near SH 288 to approximately 57.3 feet (NAVD 1988, 2001 adj) at the western boundary near Kirby Drive. Development of the tract will include filling the land to an elevation above the 100 -Year BFE to reclaim the land for development. Fill will not be placed in the FEMA Effective Regulatory Floodway. The volume of detention will be determined for mitigating developed run-off, and floodplain fill, and conveyance mitigation. 1.3 Regulatory Jurisdictions As previously noted, Lower Kirby is located in Harris County and the City of Pearland City Limits. Both of these governmental entities have published drainage design criteria. The HCFCD has jurisdiction over flood control in Harris County. However, the City of Pearland Drainage Criteria will be considered where more conservative measures are required relative to HCFCD Criteria. Harris County and the City of Pearland are participants in the National Flood Insurance Program (NFIP) and as such are required to regulate new development to comply with the minimum requirements of the NFIP, including coordination with adjoining jurisdictions. 1.4 Project Datum The source models described in Section 2 are based on NAVD 88, 2001 adjustment, which is the datum established for the Harris County Effective FIRMs. A benchmark data sheet available on the HCFCD web site describes the Harris County Floodplain reference Mark No. 010195, and lists an elevation of 57.39 feet (NAVD 1988, 2001 adjustment). Therefore, the following elevations have been established for the Harris County Floodplain reference Mark No. 010195: Elevation 59.23 (NGVD 1973) Elevation 57.39 (NAVD 1988, 2001 Adj.) Therefore, to convert NAVD 1988, 2001 adj. to NGVD 1973, add 1.84 feet. All elevations referenced in this report are tied to the NAVD 1988, 2001 adjustment datum. 1.5 Previous Studies 1.5.1 Promenade Shops Development Proposed development of The Promenade Shops Tract consisted of approximately 99.5 acres of commercial and retail development and some small amenity ponds, with the remainder of the tract consisting of detention and easements. A five -acre tract south of the main large detention pond served primarily as additional compensatory floodplain excavation. The amenity ponds H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 1-2 also provided storage primarily for floodplain fill mitigation. The existing TxDOT ditch that flows south from the Beltway 8 ROW to Clear Creek was not affected by The Promenade development. The existing stock pond was improved and the TxDOT ditch was disassociated from The Promenade drainage system. Runoff from the development is conveyed through a closed conduit system that drains from the detention pond along the south boundary of the tract to SH 288, then south along the west ROW of SH 288 and outfall into Clear Creek at a rate that is less than the pre -developed runoff rate. To date, the Promenade Shops is not fully developed and the drainage system was not constructed as designed according Shops. 1.5.2 Promenade Regional Detention Analysis Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility to the master drainage plan for the Promenade A regional detention study titled "Mitigation Plan and Impact Analysis for the Promenade Regional Development" dated November 2005 was approved by HCFCD in April 2007. The regional study included 301 acres encompassed by Beltway 8 to the north, SH 288 to the east, Clear Creek to the south, and an existing TxDOT ditch (A145- 00-00) to the west. 233 acres were considered for development, which is the entire 301 acre tract less the area within the floodway. It also included the 128 acre Promenade Shops development. Results of the analysis concluded that approximately 367 acre-feet of detention would be required for mitigating impacts from developed flows and floodplain storage loss. The existing borrow pit would be improved to provide 203 acre feet of storage volume. The remaining 164 acre feet of storage was provided by the Promenade Shops detention. 1.5.3 Water Lights Master Drainage Plan The Waterlights development is an 85 acre tract located along Clear Creek just upstream of SH H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 1-3 288. Proposed improvements included an existing borrow pit located adjacent to the north bank of Clear Creek to be excavated to provide the required volume for detention and compensatory excavation. Seventeen acres of the Water Lights development encroached into the FEMA Effective Regulatory Floodway. The loss of conveyance was to be mitigated by digging a canal adjacent to the north bank of Clear Creek. The canal, which is part of the detention pond, will provide conveyance when Clear Creek reaches a specified elevation and overflows into the detention system. The Water Lights detention pond and canal will be hydraulically connected to Clear Creek to allow runoff to drain from the development at a rate that is Tess than the existing conditions runoff. The natural ground that lies between the north bank of Clear Creek and the south edge of the pond would serve as an extreme event overflow weir during historical storm events. Drainage Design and impact Analysis for The Lower Kirby Regional Detention Facility 1.5.4 Letter of Map Revision — Fill for Goldknight Tracts A letter of Map Revision based on Fill (LOMR-F) was issued by FEMA on June 23, 2009 (FEMA Case number 09-06-1522A). The LOMR- F removed approximately 91 acres of land from the FEMA 100 -year floodplain based on conversations with the City of Pearland. A metes and bounds description is included with the Letter of Final Determination that describes the shape of the area removed. The illustration to the left was provided by the City of Pearland for use in this study. Consideration was given to this project when calculating the floodplain storage lost due to filling the natural ground. This area was not included in the calculations. 1.6 Proposed Lower Kirby Regional Development and Detention Facility In order to reclaim land from the effective 100 -year floodplain and accommodate a more urban H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 1-4 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility development, the City of Pearland is proposing a regional approach to detention for the 467 acre service area. This is a preferred alternative to individual developments providing onsite detention. Proposed improvements that were analyzed in this study are based on the Lower Kirby Master Development Plan illustrative framework exhibit. Land use based on this plan will consist of primarily commercial and institutional development, with some green space and detention areas. Exhibit 1.4 shows the proposed area of development that will be serviced by the Lower Kirby Regional Detention Facility. Four ponds are proposed that will provide the necessary detention for development and floodplain mitigation. An existing borrow pit located adjacent to the north bank of Clear Creek will be improved to provide the required storage volume for the proposed development. Additionally, the TxDOT ditch providing drainage for Beltway 8 will be improved into three linear lakes that will provide additional storage volume for the development. The four ponds will also provide a surplus capacity for the future expansion of State Highway 288 (SH 288) as requested by TxDOT. This analysis will show that existing condition water surface elevations in the TxDOT outfall channel will not be increased. Because the placement of fill to reclaim land from the floodplain will encroach up to the floodway fringe, conveyance will be affected. The loss of conveyance will be mitigated by excavating two channels parallel and adjacent to the north bank of Clear Creek. One channel will be located west of the TxDOT ditch in the same location that a pond was proposed based on the Lower Kirby Master Development Plan, and a second channel will consist of an existing pond that was part of the original Water Lights development. These channels, which will not be hydraulically connected to the proposed detention ponds, will provide compensating conveyance when Clear Creek reaches a specified elevation and overflows into them. The Lower Kirby detention ponds will be hydraulically connected to the TxDOT ditch close to its outfall into Clear Creek. Reinforced concrete pipes (RCPs) will allow runoff to drain from the 467 acre development at a rate that is less than the pre project conditions runoff. The RCPs will allow flow to travel in both directions into and out of the ponds as Clear Creek rises and falls. This will allow the ponds to provide the floodplain storage that will be lost when the land is reclaimed from the 100 -year SFHA. The natural ground that lies between the north bank of Clear Creek and the south edge of the regional pond will serve as an extreme event overflow weir during historical storm events. Therefore, this area will need to be stabilized so that the hydraulic characteristics do not change in this area. This will be addressed in more detail as development of the Lower Kirby Regional Detention Facility progresses. The 128 acre Prudential Tract located in the northeast Lower Kirby Regional Service Area is currently only partially developed. A Bass Pro Shops retail center was constructed and onsite detention was provided within the property. To date, drainage for the property is routed through an improved stock pond, then through a closed H:11607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 1-5 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility conduit storm drain along the southern edge of the property to SH 288, then south along the SH 288 ROW into Clear Creek. The pond adjacent and south of Bass Pro Shops was constructed for floodplain mitigation purposes. Numerous additional development plans for the Prudential Tract have been investigated but were never implemented. There were plans for expanding the development with additional retail, but these have also been put on hold.' Since it is unknown what future development will occur within the Prudential Property, a previous study investigated three development scenarios and proposed a regional detention plan for each one. The development scenarios are based on future development of the Prudential Tract and participation in the regional detention. The development scenarios are summarized below: • Scenario 1 — full participation of the Prudential Tract in the regional detention plan. • Scenario 2 — partial participation of the Prudential Tract in the regional detention plan. • Scenario 3 — no participation of the Prudential Tract in the regional detention plan. This report focuses on Scenario 1. This development scenario assumes that the Prudential Tract development will participate fully in the regional detention plan. In this case, the detention pond adjacent to the Bass Pro Shops center will no longer be used as floodplain mitigation and will have the option of being filled or to remain as an amenity feature. The improved stock ponds that were originally used for runoff detention will be filled to reclaim additional land for development as proposed in the Lower Kirby Urban Center Master Development Plan. The necessary allotment of detention and mitigation for the 128 acre Prudential Tract will be provided in the regional ponds. H:11607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 1-6 AM.10 ill Ine N p�ys'�al Cv'xUr1,9=a s,+, RAI Dela •siu'�'e4gtoM • nl.s 0.,,,mn 70'.G I WEN KNAn URBAN CANTER 1 PPOJECtfCUNOARv COON', BOUN[:ARv LOWER KIRBY REGIONAL DETENTION FACGRW 9,PACT ANALYSIS ANO MITIGATION PLAN VICINITY MAP WA Engineering, Inc. Busting INaterlights Canal (no hydraulic connection to Clear Creek) Existing Borrow Pit (no hydraulic connection tc Coat CreeK) Existing TxDOT Ditch Dugan (Proposed Lower Kirby Regional Detail Location) • tWU 5.001e ,001, equals IOW**. 0 500 1 30) 41,0,1r1 Alows pfrUltot Lem noctesset, Oustreu, ta rlart30vi00 deurtbed Inlfre 0)0 130 no, otonnoll .101,,o0 01 0043 chsractonstice o3301 area S00,-. 0t30 0000101.0p,, 3.310 DseeeroN. 20,0 r (000)00 000003101 .C.71 EXISTING OrOVCNA,NNE, LOWER KIRBY REGIONAL DETENTION FACILITY MITIGAIION PLAN AND IMPACT ANALYSIS EXISTING DRAINAGE LJA Engineering, Inc. Iam. Ova. 20,R ,t., arn:i;° Dom x •nb�Pro:c;.nph, cale,D.A.nte+31C. PROJEC, ILC -TEAR; 1.001:I'I.AI,T FE DODW'AY AREA REAIOVEl. WITH LOMRF LOWER /IRE, REGIONAL DETENTION FACLIT MITIGATION PLAN ANC IMPACT ANALYSIS EFFECTIVE SPECIAL FLOOD HAZARD AREA n.N..L'. dw+� WA Engineering, inc. tvn ADA.. AT: yon ,trwr item; nazonAtt•1 rng A P.F., nonfld nnonnt. nysnn nsamobnunn +ft, arm :u S.un ,.....nsa•nn, • lawn Ounnaer na” An..".1ECT 001nOnn- POonnifO Aln2A,VAI FFoFOIEU .innotn , LOWE.R AREA AEC0A.- DO" EtitION FACILITY .111IA,ON PI AN AND IMPACT ANA ...OW ER !CAEN PAN LJA En5in,L-erirtg, C. Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility 2.0 HYDROLOGIC ANALYSIS The starting hydrology models used for this analysis were received from Harris County Hood Control District (HCFCD) Map and Model Management (M3) System, which is a web interface that allows users to request the most recent and final FEMA effective models and supporting data. 2.1 Methodology The hydrograph methodology used for the drainage analysis was developed in Harris County for the design of major flood control facilities. The Watershed Modeling Method was used in lieu of the Site Runoff Curves so that the analysis would correlate with existing hydrologic models for Clear Creek. This is also the method used for the Flood Insurance Study (FIS) of the Clear Creek watershed in Harris, Brazoria and Galveston Counties. According to current City of Pearland Criteria, this is a Targe project (larger than 30 acres) with onsite detention in which a downstream impact analysis is required. HEC -HMS version 3.3.0 was used for the hydrology analyses presented in this study. This program simulates the precipitation -runoff process and computes flood hydrographs at desired locations within a watershed. The physical characteristics of the watershed are represented by an interconnected system of geographic and hydrologic components described below. 2.1.1 Watershed Characteristics The runoff processes of the HEC -HMS model used in this analysis are based on runoff hydrographs developed using Clark's Unit Graph method. This method uses the time of concentration (Tc) and storage coefficient (R) to develop the runoff hydrograph of the basin resulting from the excess precipitation during a storm event. These two parameters were calculated for each sub -watershed. The equations used to calculate Tc and R are shown below: Tc= D [ 1- ( .0062 ) ( 0.3 DLU + 0.7 DCI )](LcA/,)''06 Tc +R=7.25(L/. )0.706 If DLU < 18% or Tc + R = 4295( DLU )41 678 ( DCC y0 967 (LJ )0.706 if DLU _>_ 18% where Tc = Clark's time of concentration R = Clark's storage coefficient L = length of the longest watercourse within the drainage area (miles) LCA = length to centroid of drainage area (miles) S = average slope along the area's longest watercourse (ft/mile) DLU = percent urban development* DCI = percent channel improvement* DCC = percent channel conveyance* D = 2.46 if So _< 20 feet per mile D = 3.79 if 20 feet per mile < So s 40 feet per mile D = 5.12 if So > 40 feet per mile So = watershed slope (ft/mile) * Value for DLU, DCI, and DCC is in whole numbers. H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 2-1 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility When ponding occurs in more than 20 percent of a sub -watershed, the R -value is adjusted to account for the additional storage. The adjustment factor (RM) varies according to the design storm and is based on the area of the ponding and the percentage of the watershed affected by the ponding. The calculations for RM for the 10-, 50-, 100-, and 500 -year events are shown below: RMio = 1.28 P °.199 RM50=1.23P0.153 RM100 = 1.21 P 0.132 RM5oo=1.17P0.086 Where P = percent ponding 2.1.2 Precipitation Abstractions Precipitation abstractions are the losses from precipitation that do not show up as runoff. Abstractions include interception, evapotranspiration, surface detention, and infiltration. All these factors except the amount of impervious cover, effecting infiltration, are dependent on soil type, land use, vegetative cover, topography, time of year, temperature, etc. Impervious cover, a measure of development, is the main parameter used to describe additional development in the hydrologic model. This analysis uses the Green & Ampt method for determining the amount of the precipitation abstractions. Parameters for the Green & Ampt used in this analysis are listed below: Initial Loss = 0.1 inches Volume Moisture Deficit = 0.385 Wetting Front Suction = 12.45 inches Conductivity = 0.024 in/hr Impervious = varies % Additional development in the watershed is analyzed by increasing the value of the impervious cover parameter in the runoff model. 2.1.3 Hypothetical Storm Events This analysis used a 10 -year and 100 -year frequency design storm. The rainfall duration -depth relationship used in the HEC -HMS model is based on the National Weather Bureau publications Technical Paper No. 40, and Technical Memorandum Hydro 35. This data references point rainfall amounts for varying duration and frequency storms in Harris County, Texas. 2.1.4 Rainfall Distributions The HEC -HMS version 3.3.0 allows the user to shift the peak of the storm from 50% of the storm duration (center -peaking event similar to HEC -1) to 25%, 33%, 67%, or 75% of the storm duration. According to Appendix A Section 2.3.2 of the BDD4 Rules, Regulations, and Guidelines effective August 1, 2004 (City of Pearland Drainage Criteria), the 67% duration peaking temporal rainfall distribution was used. 2.2 Detention Requirements Since correlation with effective HEC -HMS and HEC -RAS models is necessary, the proposed Lower Kirby development area was analyzed using the Watershed Modeling Method discussed in Section 3.4.2 in the HCFCD Policy, Criteria and Procedure Manual dated December 2010. Additionally, Section 6 of the City of Pearland Drainage Criteria Manual dated November 2004 states a minimum storage of 0.65 acre-feet per acre are required regardless of the chosen H:11607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 2-2 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility methodology. According to the effective FIRMs, 271 acres of developable area lie within the Clear Creek 100 - year special flood hazard area. In order to reclaim the land from the 100 -year SFHA, fill will be placed to an elevation above the 100 -year BFE. The minimum required detention volume is exclusive of mitigation for fill in the floodplain. To calculate the volume of fill that will be placed in the floodplain, the floodplain volume along the left overbank of Clear Creek was determined from HEC -RAS for pre and post -project conditions, and the difference in floodplain volume was calculated. Discussions with TxDOT indicated that the partially improved channel that drains the South Sam Houston Tollway may be utilized for conveyance and/or storage of runoff from future improvements of State Highway 288. A rough estimate of the additional volume that could be obtained by improving the channel to its ultimate configuration was calculated, resulting in an additional 6 acre-feet that could be used for detaining for conveying runoff from SH 288 if needed. This additional volume will be provided as a surplus in the Lower Kirby Regional Detention. Regional detention will be used to mitigate lost floodplain storage, increased runoff from development, and provide approximately 6 acre-feet of surplus storage allocated to TxDOT for future road improvement projects. 2.3 Base Conditions The effective hydrology model of Clear Creek released on June 18, 2007 is the most recent model of the Clear Creek Watershed (referred to as "base model") and was used as the starting point for the analysis presented in this study. The Clear Creek Watershed used to define the base conditions HEC -HMS analysis is shown on Exhibit 2.1. The Lower Kirby development is located in the Clear Creek Sub -watershed A100f. The Tc&R parameters for the A100f Sub -area are shown below in Table 2.1 and Table 2.2. Sub- area A100f DA (sq mi) 3.36 TABLE 2.1 BASE CONDITION WATERSHED PARAMETERS Length Lia Channel Overland Channel Land Urban Slope Slope Conv. (mi) (mi) (ft/mi) (ft/mi . _°M { ) 2.77 0.95 2.80 6.00 10.00 17.40 Channel Improv. (%) 0.00 !riper. (%) 15.5 TABLE 2.2 BASE CONDITION TC&R VALUES Sub -area % Pondin• Tc A100f 23.0 1.30 R 9.04 R' (10 yr) 21.59 R' (100 yr) 16.54 *R' calculated based on the ponding adjustment. The flows used in this analysis in the HEC -RAS model for the base conditions model are shown below in Table 2.3. Supporting documentation and results for the Base Condition HEC -HMS model can be found on the CD included with this report. TABLE 2.3 BASE CONDITION PEAK FLOWS HMS Node RAS SECNO Description 10yr Peak Q 50yr Peak Q 100yr Peak Q 500yr Peak Q 2385J 239967.4 414 821 1077 1925 2228J 231533.3 1122 1902 2382 3951 H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 2-3 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility TABLE 2.3 BASE CONDITION PEAK FLOWS HMS Node RAS SECNO Description 10yr Peak Q 1138 50yr Peak Q 100yr Peak Q 500yr Peak Q 3951 2199J 222868.7 1902 2382 2143J 214705.8 1880 3105 3826 6201 1999J 197996.2 2203 3438 4244 7002 1660J 179278.5 Hickory Slough 2982 2982 4553 4553 5376 5376 7991 7991 1601J 165983.9 1271J 129631 A120-00-00 4361 6766 7901 10572 1222J 123196.7 A119-00-00 6999 10803 12497 17621 1052J 106343.5 Mary's Creek 9343 14080 16162 22566 092'%J 93497.69 Cowart Creek 11980 18188 20934 20187 0771J 77642.36 Chigger Creek 13201 19868 22891 30896 0702J 72765.55 Magnolia Creek 13562 20517 23659 31516 0601J 61501.83 13563 20518 23660 31516 0556J 55615.42 14037 21289 24535 32653 0366J 36556.81 A107-00-00 14051 21317 24557 32752 0301J 30794.12 14229 21633 24879 33496 0184J 20859.46 Armand Bayou 20938 35377 42013 64503 0140J 16112.37 A104-00-00 22481 38995 47042 72745 2.4 Revised Base Model A Corrected Effective hydrologic model (referred to as "Revised Base model") was created to incorporate current existing features and updates that the effective model did not include. Updates to the effective model include the following: • Revised storage routing relationship • Added Kirby Drive bridge and associated fill 2.4.1 Storage Routing The hydrologic and hydraulic models obtained from the HCFCD M3 website were reviewed, and the resulting HEC -HMS flows did not match the flows that were used in HEC -RAS. Discussions with HCFCD revealed that the resulting flows from the base condition HMS model do not reflect updated storage routing from the effective HEC -RAS geometry. Therefore, a revised base HEC -HMS model was created in order to achieve consistent flows between the hydrology and hydraulic models. A storage -routing spreadsheet for the entire reach of Clear Creek, received from HCFCD, was used to establish storage routing parameters based on the existing geometry of Clear Creek and the flows from the base conditions HEC -HMS. A multi profile HEC -RAS model was created using the base conditions HEC -HMS flows and the same flow ratios that were shown in the spreadsheet from HCFCD, and storage routing parameters were established from the HEC - RAS multi profile model to use in the Revised Base conditions HEC -HMS model. Several iterations were run until the models were balanced to within less than one percent of each other. 2.4.2 Kirby Drive Bridge The effective HEC -RAS model did not include the recently constructed Kirby Drive bridge over Clear Creek. Therefore, the bridge was modeled in a revised base HEC -RAS model discussed H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 2-4 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility in more detail in Section 3. The bridge and associated fill in the embankments and overbanks were included in the multi profile HEC -RAS model for determining the storage routing relationship as discussed above. The resulting flows produced by the Revised Base conditions HEC -HMS model are shown below and compared to the base condition flows in Table 2.4 below. The results of the Revised Base HEC -HMS model can be found on the CD included with this report. TABLE 2.4 REVISED BASE PEAK FLOW COMPARISONS HEC -HMS Node HEC -RAS SECNO Description 10% Peak (cfs) Flow Base 1% Peak (cfs) Base Flow Rev Base Base Base 10% vs Rev. 1% Base 2385J 239967.4 414 479 1077 1090 65 13 2228J 231533.3 1122 1117 2382 2614 -6 232 2199J 222868.7 1138 1117 2382 2614 -21 232 2143J 214705.8 1880 1864 3826 3826 -16 0 1999J 197996.2 2203 2203 4244 4256 1 12 1660J 179278.5 Hickory 2982 2896 5376 5429 -86 53 1601J 165983.9 2982 2896 5376 5429 -86 53 1271J 129631 A120-00-00 4361 4333 7901 7666 -29 -235 1222J 123196.7 A119-00-00 6999 7711 12497 13299 712 802 1052J 106343.5 Mary's 9343 10064 16162 17024 720 863 0927J 93497.69 Cowart 11980 12885 20934 22163 905 1229 0771J 77642.36 Chigger 13201 14372 22891 24462 1171 1571 0702J 72765.55 Magnolia 13562 14748 23659 25230 1186 1571 0601J 61501.83 13563 14750 23660 25232 1187 1572 0556J 55615.42 14037 15326 24535 26201 1289 1667 0366J 36556.81 A107-00-00 14051 15350 24557 26229 1299 1672 0301J 30794.12 14229 15569 24879 26580 1340 1701 0184J 20859.46 Armand 20938 17117 42013 39145 -3820 -2868 0140J 16112.37 A104-00-00 22481 17704 47042 42989 -4777 -4053 2.5 Pre Project Model The pre project HEC -RAS model was created to isolate all revisions to the base conditions model in order to determine impacts associated only with the Lower Kirby Development. The following revisions were made to the Revised Base Model to create the Pre Project HMS model: • Subdivided the A100F sub -watershed into A100F1 through A100F5 • Adjusted the Tc&R values to reflect existing conditions for each sub -watershed. • Subdivided the 2199R routing reach into 2220R and 2199R • Updated the runoff characteristics from Beltway 8 and offsite area north 2.5.1 Subdivided A100F The A100F Subwatershed contains three channels that outfall into Clear Creek. These channels are under the jurisdiction of TxDOT and convey storm water runoff from Beltway 8 to Clear Creek. A100F was subdivided in order to establish drainage areas for each individual channel (A100F2, A100F3, and A100F4). Two more areas were also delineated; one area H:11607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 2-5 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility (A100F5) south of Clear Creek makes up the portion of the original A100F Subwatershed south of Clear Creek, and an area north of Beltway 8 (A100F1) reflects offsite flow coming across the ROW into the TxDOT channel east of Kirby Drive. Data used to delineate the drainage areas included LiDAR topography, aerial photography, field reconnaissance, available construction plans, and reports. The size or shape of A100F did not change with the subdivided areas. Exhibit 2.2 illustrates the pre project drainage areas. 2.5.2 Subdivided Routing Reach 2199R A new junction (2220J) was added to the pre project HMS model to reflect the outfall from the regional detention facility. This is the same outfall as the TxDOT Ditch east of Kirby Drive. To add the new junction, the routing reach 2199R was subdivided into 2220R and 2199R, and Junction 2220J was added between the two reaches. Storage routing relationships were calculated the same way as the revised base conditions. 2.5.3 Runoff from Beltway 8 In January 2011, a drainage impact study for the Sam Houston Tollway South Widening was created by Brown & Gay Engineers (BGE). A segment of the tollway ROW plus approximately 134 acres north of the tollway drain to the TxDOT ditch, called Channel S-2 according to the BGE report. The Study used EPA SWMM to analyze the proposed design and its effects on Channel S-2. The EPA SWMM model was used to determine the effectiveness of a proposed detention basin for mitigation measures. The SWMM model results produced a runoff hydrograph for Channel S-2 (TxDOT Ditch) that was used in the pre project conditions HEC -HMS model for the Lower Kirby analysis. The runoff hydrograph was entered into the pre project HEC -HMS model using a source node to represent runoff from the offsite area north of Beltway 8 plus a portion of the proposed Beltway 8 improvements. This area is designated A100F1 in this study. The January 2011 BGE study can be found on the CD included with this report. Section 3.4, Page 48, of the BGE study showed a 100 -year WSEL of 56.9' (NAVD 88, 2001 adj) in Channel S-2 at the south ROW boundary of Beltway 8. The analysis presented in this report will show that the peak water surface elevations in the improved channel will not exceed those shown in the BGE study. 2.5.4 Tc&R Values New Tc&R parameters were established for the subdivided drainage areas discussed above. The parameters were determined based on existing conditions using available aerial photographs. Ponding areas and areas affected by detention was interpolated from the original A100F parameters. The Tc&R parameters established for each drainage area are shown below in Table 2.5 and Table 2.6. Sub- DA area (sq mi) A100F1 0.269 A100F2 0.238 A100F3 0.778 A100F4 0.773 A100F5 1.300 TABLE 2.5 PRE PROJECT CONDITION TC&R PARAMETERS Channel Overland Channel Land Urban. Channel Length Lia Slope Slope Conv. o Improv. (mi) (mi) (mi) (ftlmi) (%) (/o) (%) This sub area input to HMS as a source node (see section 2.4.3) 1.54 1.05 3.90 6.00 10.00 20.00 0.00 0.95 0.57 4.30 6.00 10.00 10.00 0.00 1.41 0.85 5.70 6.00 10.00 85.00 0.00 1.21 0.95 2.80 6.00 10.00 75.00 0.00 Imper. (%) 15.5 22 55 65 H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 2-6 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility TABLE 2.6 PRE PROJECT CONDITION TC&R Sub -area % Ponding Tc R R' (10 yr) R' (100 yr) A100F1 This sub area input to HMS as a source node Csee section 2.4.3) 4.87 4.87 A100F2 5 1.21 4.87 A100F3 34 0.61 3.56 9.20 6.87 7.83 A100F4 22 0.69 4.31 10.20 A100F5 35 1.16 4.61 11.96 8.91 The Tc&R values in Table 2.6 were entered into a pre project HEC -HMS model. The pre project model will be compared to the post project results to show differences in flows attributed directly to development of the Lower Kirby without any other influences such as sub -divided drainage areas or revised Tc&R parameters. The resulting flows are shown below in Table 2.7 and compared to the revised base flows. The pre project condition HEC -HMS model can be found on the CD included with this report. TABLE 2.7 PRE PROJECT PEAK FLOW COMPARISONS HEC -HMS Node HEC -RAS SECNO Description 10% Peak Flow (cfs) 1% Peak Flow (cfs) Rev. Base vs Pre Project Rev. Base Pre Project Rev. Base Pre Project 10% 1% 2385J 239967.4 479 484 1090 1099 5 9 2228J 231533.3 1117 1148 2614 2662 31 48 2199J 222868.7 1117 1148 2614 2662 31 48 2143J 214705.8 1864 1934 3826 3922 70 96 1999J 197996.2 2203 2240 4256 4359 37 102 1660J 179278.5 Hickory 2896 2910 5429 5443 14 15 1601J 165983.9 2896 2910 5429 5443 14 15 1271J 129631 A120-00-00 4333 4340 7666 7679 8 13 1222J 123196.7 A119-00-00 7711 7718 13299 13312 7 13 1052J 106343.5 Mary's 10064 10071 17024 17037 7 13 0927J 93497.69 Cowart 12885 12892 22163 22176 7 13 0771J 77642.36 Chigger 14372 14379 24462 24474 7 12 0702J 72765.55 Magnolia 14748 14755 25230 25242 7 12 0601J 61501.83 14750 14757 25232 25244 7 12 0556J 55615.42 15326 15332 26201 26212 6 11 0366J 36556.81 A107-00-00 15350 15356 26229 26239 7 11 0301J 30794.12 15569 15576 26580 26591 6 11 0184J 0140J 20859.46 Armand 17117 17123 39145 42989 39144 6 -1 16112.37 A104-00-00 17704 17705 42985 1 -4 2.6 Post Project Hydrology - Lower Kirby Detention Facility In the analysis, the amount and rate of surface runoff entering the detention facility directly affects the stages in the ponds as does any additional flow transfer between adjacent lakes. The amount of available storage in the Take also affects the stages. Stages in a particular segment of an outfall channel is affected by the amount of runoff entering the channel segment, the upstream inflow amount and rate, the available storage in the channel and downstream H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 2-7 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility stages. Flow rates, stages and available storage all change at every time step in the simulation. Surface runoff rates from the HEC -HMS flow hydrographs are continually changing. These changes cause stage variations throughout the system. Flow rates through the culverts and channel segments are, in turn, affected by the stages. The only way to analyze the drainage system is to solve the entire drainage network simultaneously at each time step in the simulation. Inflows, outflows and changes in storage (and stage) must be calculated and updated on a continual basis. The hydraulic analysis of The Lower Kirby drainage system used Streamline Technologies, Inc. "Advanced Interconnected Channel and Pond Routing" (ICPR) Ver. 3.02. However, the post project runoff hydrographs that are routed through detention must be computed. In ICPR, all inflows are assigned to nodes (point loading). This means that the rainfall runoff is assigned to specific nodes for routing through the proposed detention system. Since hydrographs can be entered directly into ICPR, developed undetained hydrographs generated by HEC -HMS were imported into ICPR. Each drainage area represents a node in ICPR that is assigned an inflow hydrograph. The drainage areas are typically delineated based on the contributing area to each lake. For the Lower Kirby Development, four lakes are proposed. In addition, runoff from the area north of Beltway 8, the Kirby Drive corridor, and the Promenade Tract will be routed through the proposed detention system. Therefore, seven nodes are proposed in ICPR that will have inflow hydrographs assigned to them. As discussed in Section 2, A100F was subdivided into A100F1 through A100F5. Sub -area Al 00F3 represents the drainage area for the TxDOT ditch that will be used for the outfall from the Lower Kirby Regional facility. For the internal analysis of Lower Kirby, the pre project sub- areas were modified as follows: • 128 acres reflecting the Prudential Tract were added to A100F3 • 172 acres reflecting the offsite area north of Beltway 8 were added to A100F3 • Sub -Area A100F3 was further subdivided into A100F3A through A100F3F In summary, A100F3 gained 300 acres, A100F1 was eliminated, and A100F4 lost 122 acres. Exhibit 2.3 illustrates the internal drainage areas used to generate the inflow hydrographs in ICPR. Table 2.8 and Table 2.9 list the Tc&R parameters and values for the internal drainage areas. TABLE 2.8 LOWER KIRBY REGIONAL INTERNAL TC&R PARAMETERS Sub area DA Length Lce Channel Slope Overland Slope Channel Conv. Land Urban. Channel Improv. Imper. (node) (sq mi) (mi) (mi) (ft/mi) (ft/mi) (%) (%) (%) (%) A100F1 0.269 ICPR inflow hydrograph imported from South Sam Houston Tollway reporter BGE A100F3A 0.153 0.40 0.23 2.46 6.00 100 100.00 100 85 A100F3B 0.118 0.36 0.19 2.46 6.00 100 100.00 100 85 A100F3C 0.165 0.39 0.21 2.46 6.00 100 100.00 100 85 A100F3D 0.151 0.64 0.44 2.46 6.00 10 0.00 0 46 A100F3E 0.191 0.72 0.33 2.46 6.00 100 100.00 100 61 A100F3F 0.190 0.57 0.28 2.80 6.00 100 100.00 100 85 H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 2-8 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility TABLE 2.9 LOWER KIRBY REGIONAL INTERNAL TC&R VALUES L R' (10 yr) Tollwayreport 0.72 Sub -area (node) Ponding Tc R from South Sam Houston 0.72 R' (100 yr) by BGE 0.72 A100F1 ICPR inflow hydrograph 0 imported 0.12 A100F3A A100F3B 0 0.10 0.68 0.68 0.68 A100F3C 0 0.11 0.71 0.71 0.71 A100F3D 46 0.64 8.80 6.44 A100F3E 0 0.19 1.23 1.23 A100F3F 0 0.14 0.89 0.89 0.89 The Tc&R values for each of the sub -areas were input into a HEC -HMS model to generate inflow hydrographs for each ICPR node. The developed hydrographs were routed through the proposed Lower Kirby Regional detention facility using ICPR as discussed in Section 3 of this report. The resulting outfall hydrographs from ICPR were then entered into a post project HEC - HMS model of Clear Creek as source nodes to determine the impact of the proposed facilities by comparing the peak flows to the pre project model results. 2.7 Post Project Hydrology - Clear Creek The pre project HEC -HMS model was modified to include the proposed Lower Kirby Regional development. The following changes were made to the pre project conditions hydrology to create the post project hydrology: • Sub -Areas A100F1 and A100F3 combined as Sub -Area A100F3. • 122 acres added to Sub -Area Al 00F3 from Sub -Area Al 00F4 (Prudential Tract). • A100F3 was changed to a source node in HMS. • Storage routing was re-evaluated based on proposed fill. Table 2.10 and Table 2.11 list the post project Tc&R parameters for the developed Lower Kirby Regional Tract. TABLE 2.10 POST PROJECT CONDITION TC&R PARAMETERS Channel Overland Channel Land Channel DA Length Lca Imper. Sub -area Slope Slope Conv. Urban. Improv. o (sq mi) (mi) (mi) (ft/mi) (Wm!) (%) (%) (%1 (%) A100F2 0.238 1.54 1.05 3.90 6.00 10 20 0 15.5 A100F3 1.237 Hvdrooraph from ICPR Results mported directly into HMS as a source node A100F4 0.583 1.41 0.85 5.70 6.00 10 85 1 0 55 A100F5 1.300 1.21 0.95 2.80 6.00 10 75 1 0 65 H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 2-9 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility TABLE 2.11 POST PROJECT CONDITION TC&R VALUES Sub -area °A) Ponding Tc R R' (10 r R' (100 yr) A100F2 5 1.21 4.87 4.87 4.87 A100F3 Hydrograph from ICPR Results imported directly into HMS as a source node A100F4 22 0.69 4.31 10.20 7.83 A100F5 35 1.16 4.61 11.96 8.91 The runoff hydrograph generated for "Al00F3" will be combined directly with computation node 2220J in the post project HEC -HMS. This hydrograph reflects the resulting flows from the regional pond after being routed through the proposed detention ponds using the Advanced Interconnected Channel and Pond Routing (ICPR) program es discussed in Section 3 of this report. H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013 doc Page 2-10 Nxc _ iriarrndl on aeetsnt. le Nein.n. ♦rot ,rde,,Ccellc .^ a� Fa.+:ic .vrx4a�Ha F!» a,!s Det: F.Cac Ae.el fT .evN1n him PRO.[[' OOUNI,R °ILIR C ECY. iJ&NEATER=NEn BO'JN3:P. E*hiNI 2' LOWER KIRBY REGIONAL DETENTION FACILITY MITIGATION PLAN ANC rMPACT ANALYSIS EFFECTIVE CLEAR CREEK WATERSHED LLJA Engineering, Inc. 4 7-1 UPOMA1D€TEOVCF. M1LA pilcuE,T 44.AS CONOUTArICTIN Exhi.,it 2 LOWER KIRBY REGIONAL OFT ENT1ON FACILITY MITIGATION PLAN AND IMPACT A NA Lvsis PRE PROJECT CLEAR CREEK 503 -WATERSHEDS LJA Engineering, Inc. 4 4V Sc*. 1 I cf eaeua tip(. MB en. en VKINcanwe Immo ncm.ary n.l�uw'ne Jw iAa-Mcr 0aeerNa n !le NM and a a. .dartla0 z'neaeda y4 orykai ehssuar+ues M Te naA Ors Sam. A..N 1m:so ny-mmK Dei wnCr L`IL WAND O PROJECT BOUNDARY CMFLOW PADA SFETTRUN INTERNAL EUBWA ERSNw +. KW COMPUTATION MICE _ PROPOSED DETENTION LYN. 2 1. LOWER KIRBY REGIONAL DETENTION FACILITY MITIGATION PLAN AND IMPACT ANALYSIS INTERNAL DRAINAGE AREAS ; LJA Engineering, Inc. IA Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility 3.0 HYDRAULIC ANALYSIS In accordance with HCFCD Policy, Criteria, and Procedure Manual and City of Pearland Storm Drainage Design Criteria detention facilities will be provided to mitigate developed runoff from the Lower Kirby Regional Development. The proposed drainage and detention system consists of four interconnected ponds that outfall into Clear Creek through a controlled outfall structure. Analysis of the proposed drainage and detention system needs to generate the following two results: • The proposed flow into Clear Creek to insure the existing peak flows and water surface elevations are not increased. • The 10- arid 100 -year water surface elevations in the proposed lakes to determine the amount of available storage for floodplain and development mitigation. 3.1 Lower Kirby Regional Detention Facility The hydraulic analysis of The Lower Kirby drainage system used Streamline Technologies, Inc. "Advanced Interconnected Channel and Pond Routing" (ICPR) Ver. 3.02. This program is accepted by FEMA for use with flood insurance studies. The ICPR program dynamically routes storm water through open channels and/or closed conduits and can simulate a variety of complex conveyance systems, including looped systems. ICPR uses conservation of mass and the momentum equation to simulate unsteady hydraulic behavior. This means that bi-directional flow can be modeled and the tailwater elevation at an outfall is considered in the calculations. In its pond routing routine, HEC -HMS cannot consider the effects of tailwater. Therefore, ICPR provides a more "real world" model. ICPR uses a link -* node concept to represent real-world systems. This concept requires that the drainage system be simplified into a network of nodes, or junctions, and links, or reaches. A node is a discrete location in the drainage system where conservation of mass or continuity is maintained. Nodes are placed upstream and downstream of any structure (e.g., weirs, culverts, drop structures). In the ICPR model, a node is place at each point where a stage calculation is needed. Runoff hydrographs are assigned to nodes. A100F1, and A100F3A through A100F3F are specified as nodes. Additional nodes such as manholes have been added at the upstream and downstream ends of culverts or channel reaches to properly model these connections and to specify other points of inflow. Links are connections between nodes and are used to transfer or convey water through the system. The entire system of nodes and links forms the nodal network and serves as the computation framework for ICPR. 3.1.1 Detention Facility Modeling In ICPR, ponds are modeled as level pools. This implies that the water surface within the storage area is flat, and rises or falls uniformly across the surface. A single node was used to model each pond in the Lower Kirby Development using a stage -area relationship to describe the water holding capacity. The stage -area relationship was derived from the Lower Kirby Urban Center Master Development Plan and based on an assumed lake cross section with 4:1 sides to obtain the surface area of the lake at corresponding elevations. 3.1.2 Stage -Area Nodes Node locations used to model The Lower Kirby Development are shown on an ICPR Schematic in Exhibit 3.1. ICPR allows eight node types: stage -area, time -stage, stage -volume and four H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 3-1 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility node types to simulate manholes each type representing a different floor type and ghost nodes that are used to include information regarding a specific location is the drainage system without including the node in the model for computation purposes. Stage -area nodes were used to represent the detention facilities. 3.1.3 Boundary Nodes Every drainage system must have boundaries, or limits. While the upstream boundaries of a system typically do not require special consideration, downstream boundaries are important. Downstream boundaries usually occur at locations where stage elevations as a function of time are known (time -stage nodes). Since the Lower Kirby Facility will not contain flap gates or other means to prevent backflows into the system, the boundary condition used in the ICPR model will vary with respect to time as Clear Creek rises then falls over the course of the rainfall event, allowing flows to enter and exit the lake system. The time -stage data at the outfall point was obtained using the storage -discharge model of Clear Creek from the base conditions HEC -RAS. Multiple profile HEC -RAS run generated a rating curve that was added to the routing in the HEC -HMS model to determine the water surface elevation versus time relationship at the proposed outfall location on Clear Creek. The time -stage relationship was entered into ICPR for the boundary condition at the outfall location. Figure 3.1 below shows a graphical plot of the stage hydrograph boundary condition in ICPR. 56.00 56 OC 54 00 52 00 O O N W 00 2 N 46 00 46 00 44 00 42 CO I -10 -Year Event 1 50 -Year Event --100-Year Event .-500-Year Event 0.00 20 00 40 00 60 00 e0 00 100.00 Time (hrs) 120.00 140.00 160.00 150 ,00 Figure 3.1 3.1.4 Pipes In The Lower Kirby Development, closed conduit pipes connect the ponds and outfalls. In ICPR link flow direction can be set to both, positive only, or no flow. "Both" is the normal setting and allows flow reversals to occur. The pipe Manning's roughness coefficient was 0.013 for pre -cast reinforced concrete pipe (RCP). Friction loss was calculated using the average conveyance H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 3-2 TABLE 3.2 PRE PROJECT CONDITION WATER SURFACE ELEVATIONS --------..-.--- HEC SECNO Description Water Surface Elevation 10 -year 100 -year 230159.2 56.82 58.01 230878.1 56.99 58.12 231533.3 57.09 58.21 232232.1 57.20 58.29 232999.9 57.36 58.34 233734.5 57.72 58.48 234420.7 DIS Almeda School Rd 58.34 58.73 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility 3.2.4 Post Project HEC -RAS The primary function of a watercourse and its associated floodplain is the collection, storage and transmission of storm water runoff. A floodplain can be described as nature's prescribed and natural easement along a watercourse. When fill is placed in the floodplain, not only is flow area (conveyance) lost, but the water that is dynamically stored in slow moving streams and floodplains is lost. Reducing conveyance of a watercourse will usually result in increased water surface elevations. Reducing or eliminating this natural storage in a drainage system can increase downstream flow. Neither result is acceptable. Therefore, the impacts of the proposed Lower Kirby development will be mitigated. Figure 3.2 illustrates a proposed cross section in Clear Creek through The Lower Kirby Development. P', 0 65 Pro.osed Fill A100-00.00 Plan 1 j Pre Pro) 2) Post 50 4 Existing Ground 40 0 2000 Proposed Channel 4000 Legend WS 1PCT_100yr - Pre Proj Ws 1PCT_100yr-Pest r— Post - Pest Ground - Post heft , Post • Bank Sta - Post - Pre Proj Pre Proj Ground - Pre Proj J Inett - Pre Proj Bank Sta.- Pre Proj 6000 0000 10000 12000 14000 16000 Statron (5) 9260 53, 65 04 Figure 3.2 The figure shows the proposed cut and fill (pink line) relative to the natural ground (black line) and base flood elevation (blue line). The area shaded by the green hatching is the ineffective flow area. This is the area where the flow is naturally stored and moved along the overbanks at H:11607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 3-5 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility very slow velocities; typically less than one foot per second. The filled area that is not shaded reflects the effective flow area where flow is being moved along the channel at a higher velocity; typically 3 to 6 feet per second. If the ineffective or effective flow area is reduced, increases to flows and water surface elevations can result. Neither is acceptable. Approximately 280 acres of the effective Clear Creek floodplain will be filled to reclaim the land for development of the Lower Kirby Tract. The lost floodplain storage (ineffective flow area) will be mitigated with compensatory excavation in the four lakes. The lakes will be hydraulically connected to Clear Creek and will be allowed to fill and drain as Clear Creek rises and recedes, providing the floodplain storage that was lost due to fill. The loss of conveyance will be mitigated by excavating two channels parallel and adjacent to the north bank of Clear Creek. One channel will be located west of the TxDOT ditch in the same location that a pond was proposed based on the Lower Kirby Master Development Plan, and a second channel will consist of an existing pond that was part of the original Water Lights development. These channels, which will not be hydraulically connected to the proposed detention ponds, will provide compensating conveyance when Clear Creek reaches a specified elevation and overflows into them. Increased rainfall runoff from the proposed development will be detained. Outflow from the ponds will be controlled as it is released into Clear Creek, such that the release rate is equal to, or less than the existing runoff rate. Changes to the pre project HEC -RAS model include: • Fill the left overbanks of Clear Creek above the 100 -year BFE in cross section 223668 through 228828 to reclaim the land from the 100 -year floodplain. • Excavate conveyance mitigation channel in cross sections 228044, and 225542 through 224031 • Re-evaluate the storage routing reflecting proposed fill and excavation • Revise the flows to reflect flows from the post project HEC -HMS model A summary of the post project 10- and 100 -year water surface elevations in the vicinity of the project area for each scenario areahovjn Below. The CD included with this report contains the full HEC -RAS model results for the f , 6-, 100-, and 500 -year storm events. Table 3.4 gives the 10- and 100 -year water surface elevations in Clear Creek for the Post Project condition. TABLE 3.3 POST PROJECT CONDITION WATER SURFACE ELEVATIONS HEC SECNO Description Water Surface Elevation 10 -year 100 -year 211277.7 Upstream of Cullen Blvd 50.48 51.10 212049.2 50.88 51.52 212735.5 51.10 51.68 213290.6 51.30 51.89 213801.7 51.50 52.14 214705.8 51.77 52.45 215408.2 51.81 52.51 216257.9 51.84 52.56 216969 51.88 52.62 217869.1 51.96 52.74 218474 52.13 52.98 H:11607-1102 Spectrum Regiona110ocs\Spectrum Regional Detention April 2013.doc Page 3-6 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 3-7 TABLE 3.3 PROJECT CONDITION WATER SURFACE ELEVATIONS POST Description Water Surface Elevation HEC SECNO 10 -year 100 year 52.60 53.43 219190.5_ 53.07 53.94 219890.153.46 54.33 220697.22 53.59 54.47 221401.5 53.73 54.65 222149.2 222868.754.19 54.08 55.26 223445.11 55.45 223455 SH 288 54.21 55.58 223068.1 54.21 55.61 224031.4 54.61 56.05 225035.7 225542.2 54.71 56.14 226430.555.46 54.96 56.33 227358.8 56.62 228044.5 55.56 56.76 55.81 57.13 228828.4 228950 Kirby Drive 229073.3 56.00 57.55 229428.1 56.11 57.67 230159.2 56.70 57.92 230878.1 56.90 58.04 58.13 57.02 231533.3 57.15 58.21 232232.1 232999.9 57.33 58.29 57.71 58.46 233734.5 234420.7 D/S Almeda School Rd 58.34 58.71 H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 3-7 Nc4m A100F 34 Pea100H Mr3E3 0 SP Unit. Fps. LGannal• 313, r449 Sow ° Mt km 0 300 45) • Lao Nal/ *9.97.979905,9!:, fa, 9771,91W1,71. 4911.317,7 cncribed Ine pm He -0 r1,1r00nSed 01 1 r,nsevert.. cf Sou., aysy Fr:1 974014) •349 ,9(01 1111111 PROPOE. PORN 3 1 LOWER KIRBY REGIONAL DETENTION FACILITY MITIGATION PLAN AND IMPACT ANALYSIS :CPR SCHEMATIC LJA Engineering, Inc. Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility 4.0 RESULTS AND CONCLUSIONS 4.1 Hydrology Results The HEC -HMS results indicate that the peak 100 -year undetained flow from the Lower Kirby Development is approximately 2,331 cfs, but is limited to approximately 715 cfs according to the pre project HEC -HMS model. The proposed detention system for The Lower Kirby Development produces a peak 100 -year flow of 477 cfs from the detention facility, which is less than the maximum allowable rate. The 10 -year HEC -HMS results conclude that the peak discharge from the detention facility does not exceed the allowable peak flow as well. Table 4.1 summarizes the peak discharges for The Lower Kirby Development. TABLE 4.1 LOWER KIRBY REGIONAL PEAK FLOW COMPARISONS Storm Event Allowable 0 (cfs) Un -detained Q` (cfs) Detained Q (cfs) 10 -yr 366 1,494 204 100 -yr 715 2,331 477 'Pre Project HEC -HMS 2Post Project HEC HMS Internal 31CPR To incorporate the proposed Lower Kirby Development into the Clear Creek Watershed, post project flows were routed through detention using ICPR using a variable tailwater boundary condition. The results from ICPR produced a hydrograph for the outfall into Clear Creek. The {CPR hydrograph was entered directly into the post project HEC -HMS model of Clear Creek at computation node 2220J. Results of the post project HEC -HMS model at selected points along Clear Creek are compared to the pre project HEC -HMS results in Table 4.2 below. CLEAR CREEK PEAK TABLE 4.2 FLOW COMPARISONS 1% Peak (cfs) Pre Project 1099 Flow Post Project 1099 Pre Project Post 10% 0 HEC -HMS Node HEC -RAS SECNO Description 10% Peak (cfs) Pre Project 484 Flow Post Project 484 vs Project 1% 0 2385J 239967.4 2228J 231533.3 1148 1148 2662 2662 0 0 2199J 222868.7 1148 1148 2662 2662 0 0 i 2143J 214705.8 1934 1884 3922 3849 -50 -73 1999J 197996.2 2240 2223 4359 4292 -17 -66 1660J 179278.5 Hickory 2910 2905 5443 5433 -5 -11 1601J 165983.9 2910 2905 5443 5433 -5 -11 1271J 129631 A120-00-00 4340 4339 7679 7675 -2 -4 1222J 123196.7 A119-00-00 7718 7717 13312 13308 -1 -4 1052J 106343.5 Mary's 10071 10070 17037 17034 -1 -4 0927J 93497.69 Cowart 12892 12891 22176 22172 -1 -4 0771J 77642.36 Chigger 14379 14377 24474 24471 -1 -4 0702J 72765.55 Magnolia 14755 14753 25242 25239 -1 -4 0601J 61501.83 14757 14756 25244 25241 -1 -4 0556J 0366J 55615.42 15332 15331 26212 26209 -1 -3 36556.81 A107-00-00 15356 15355 26239 26237 -1 -3 0301J 30794.12 15576 15574 26591 26588 -1 -3 H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 4-1 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility TABLE 4.2 CLEAR CREEK PEAK FLOW COMPARISONS HEC -HMS Node HEC -RAS SECNO Description 10% Peak Flow (cfs) 1% Peak (cfs) Flow Post Project 39144 Pre Project vs Post Project 158 462 Armand Pre Project 17123 Post Project 17122 Pre Project 39144 10% -1 1 0 0 0184J 20859.46 0140J 16112.37 A104-00-00 17705 17705 42985 42985 0 4.2 Mitigation Results Approximately 304 acre-feet of storage is required to detain the developed flows from the Lower Kirby Development, this volume produces a detention rate of 0.65 acre -ft per acre, which is the minimum allowable detention volume for the City of Pearland. The proposed Lower Kirby Development is located along the left (north) overbank of Clear Creek between SH 288 and Kirby Drive. The floodplain volume in the left overbank of Clear Creek was calculated in HEC -RAS for existing and proposed conditions, and the difference in volume is the volume of displacement from the proposed 280 acres that will be filled to reclaim land from the Clear Creek SFHA. The resulting volume of floodplain storage displaced below the 100 -year BFE is 158 acre-feet. The total volume of detention for the development of the 467 acre Lower Kirby Tract is 462 ac -ft. Table 4.5 summarizes the results of the required detention volumes for the Lower Kirby Development. TABLE 4.3 REQUIRED STORAGE VOLUME SUMMARY Service Area Development (ac-ftL Floodplain Storage (ac -ft) Total (ac -ft (ac) 467 304 158 462 ICPR results included the maximum water surface elevations and corresponding surface area in each of the modeled detention facilities. Using this data, the available storage volume can be calculated. These results are shown in Table 4.6. TABLE 4.4 AVAILABLE STORAGE VOLUME Lake ID Normal Pool Elevation (ft) 44.68 Min. Lake Area (acres)Area 0.50 Max. Lake (acres) 4.40 Max WSEL1 (ft) 56.49 Min' , WSEL (ft) 44.68 Depth (ft) 11.82 Average Area (ac) 2.45 Volume (ac -ft) 28.96 A100F3A A100F3B 44.22 0.65 6.02 56.49 44.22 12.28 3.34 40.95 A100F3C 44.10 4.50 12.02 56.49 44.10 12.40 8.26 102.42 A100F3D 44.00 27.55 31.74 54.00 44.00 10.00 29.65 296.45 Total Detention Storage Provided= 468.79 NAVD 1988, 2001 adj. The total storage available in the proposed ponds will provide adequate volume necessary for the total required detention if built as recommended in this report. A surplus storage volume of 6.8 acre-feet is also available, which can be utilized by TxDOT for future SH 288 improvements, H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 4-2 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility or any other roadway improvement in this vicinity should TxDOT require the additional storage. Additionally, the peak water surface elevation in the regional system will not exceed 56.9', which is the peak elevation discussed in the BGE drainage study for Beltway 8 outfall channel S-2. As discussed in Section 3; the culverts used to connect the individual ponds were sized to minimize head loss across the structure and therefore maximize the storage capacity in the upstream ponds. This configuration allows the interconnected ponds to act as essentially one storage reservoir, therefore allowing flexibility in the individual pond size and capacity; as long as the total required storage volume is provided below the prescribed water surface elevation, the system should function as designed. Approximately 6 ac -ft of storage volume in the system has been allocated to TxDOT should it be needed for future improvements to SH 288. Based on the regional detention design, this volume can be disbursed into any of the four ponds. It is recommended, however, that changes to the pond sizes be analyzed to verify the effectiveness of the regional detention system. 4.3 Hydraulic Results The flows produced by the post project HEC -HMS model were entered into a post project HEC - RAS model and the resulting water surface elevations were compared to the pre project elevations as shown in Table 4.7. TABLE 4.5 CLEAR CREEK WATER SURFACE ELEVATION COMPARISONS HEC SECNO Description Water Surface Elevation 10 -Year 100 -Year Pre Proj P°st Diff Pre Proj Post Diff 211277.7 Upstream of Cullen Blvd 50.49 50.91 50.48 50.88 -0.01 -0.03 51.13 51.54 51.08 51.50 -0.05 -0.04 212049.2 212735.5 51.14 51.11 -0.03 51.70 51.66 -0.04 213290.6 51.34 51.30 -0.04 51.91 51.87 -0.04 213801.7 51.54 51.50 -0.04 52.17 52.13 -0.04 214705.8 51.81 51.78 -0.03 52.46 52.44 -0.02 215408.2 51.85 51.82 -0.03 52.53 52.50 -0.03 216257.9 51.88 51.85 -0.03 52.57 52.55 -0.02 216969 51.92 51.88 -0.04 52.63 52.61 -0.02 217869.1 52.00 51.97 -0.03 52.75 52.73 -0.02 218474 52.17 52.14 -0.03 52.99 52.98 -0.01 219197.5 52.62 52.60 -0.02 53.44 53.43 -0.01 219890.1 53.08 53.07 -0.01 53.94 53.94 0.00 220697.2 _ 53.47 53.60 53.46 -0.01 54.33 54.33 0.00 221401.5 53.59 -0.01 54.47 54.47 0.00 222149.2 53.74 53.73 -0.01 54.65 54.65 0.00 222868.7 54.09 54.08 -0.01 55.26 55.26 0.00 223445.1 54.19 54.19 0.00 55.45 55.45 0.00 223455 SH 288 223668.1 54.21 54.21 0.00 -0.01 55.58 55.58 0.00 224031.4 54.22 54.21 55.62 55.62 0.00 225035.7 55.05 54.61 -0.44 56.38 56.05 -0.33 225542.2 55.16 54.71 -0.45 56.44 56.14 -0.30 226430.5 55.30 54.96 -0.34 56.50 56.33 -0.17 227358.8 55.55 55.46 -0.09 56.64 56.64 0.00 H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 4-3 Drainage Design and Impact Analysis for The Lower Kirby Regional Detention Facility TABLE 4.5 CLEAR CREEK WATER SURFACE ELEVATION COMPARISONS HEC SECNO Description Water Surface Elevation 10 -Year 100 -Year Pre Proj 55.70 Post Proj 55.56 Diff -0.14 Pre Proj 56.77 Post Proj 56.76 Diff -0.01 228044.5 228828.4 56.21 55.81 -0.40 57.33 57.13 -0.20 228950 Kirby Drive 229073.3 56.36 56.00 -0.36 57.69 57.58 -0.11 229428.1 56.45 56.11 -0.34 57.79 57.73 -0.06 230159.2 56.82 56.67 -0.15 58.01 57.99 -0.02 230878.1 56.99 56.89 -0.10 58.12 58.11 -0.01 231533.3 57.09 57.01 -0.08 58.21 58.20 -0.01 232232.1 57.20 57.15 -0.05 58.29 58.27 -0.02 232999.9 57.36 57.32 -0.04 58.34 58.33 -0.01 233734.5 57.72 57.71 -0.01 58.48 58.47 -0.01 234420.7 DIS Almeda School Rd 58.34 58.34 0.00 58.73 58.72 -0.01 Digital copies of all the models used in this analysis are contained on a CD in Appendix A. 4.4 Conclusions The impact of the projected development of approximately 467 acres of land, including floodplain reclamation will require detention to mitigate the increased runoff from development and to compensate for floodplain storage and conveyance Toss as a result of filling the floodplain. A proposed regional detention system will detain the increased rainfall runoff from the development and provide floodplain storage and conveyance mitigation to replace the storage lost due to reclaiming the area in the floodplain. With the implementation of the detention system and the compensatory excavation discussed above, the proposed changes to the Clear Creek Floodplain will be in accordance with National Flood Insurance Program (NFIP) regulations and will not adversely impact the Clear Creek Watershed. The proposed project has no impact to existing flood hazard conditions for storm events up to and including the 100 -year event. For development to occur orderly and economically, proper planning is essential. The drainage analysis presented in this report shows that the proposed development of the 467 acre tract is feasible from a drainage perspective. The proposed design will convey the rainfall runoff to the outfall channels, which will not be adversely affected if the required detention is provided for the development. H:\1607-1102 Spectrum Regional\Docs\Spectrum Regional Detention April 2013.doc Page 4-4 Appendix 8 Agreement Exhibits • LKPMD Financing Agreement Map • LKPMD/PMMD No. 1 City of Pearland Drainage Plan Review Fee • LKPMD/PMMD No. 1 Financing Agreement Projects — Summary of Costs • LKPMD/PMMD No. 1 Improvement Shares Exhibit • LKPMD Construction Cost Estimate • PMMD No. 1 Construction Cost Estimate • LKPMD Boundary Map • LKPMD Proposed Improvements Map 4411 GRAMMAFLRD mriec JOSUE 11111111.11. 1 LOWER KIRBY PEARLAND MUNICIPAL MANAGEMENT DISTRICT FINANCING AGREEMENT MAP FEEinfi AnY `21.1 1 Inch 1,000 loot CAIE• UAW:Pi LOWER KJRBY PEARLAND MG - MOO DRAJNAGE IMPROVEMENTS ROW L t.. - - _ E A SEGMENT F INSIIIMP SEGMENT K ENT B ammo SEGMENT 0 SEGMENT L 6.411.1.1111.':' ENT C SEGMENT H ammei SEGMENT M • 'Ailimi'sSEGMENT D -SEGMENT mr§goSEGMENT N - I EGMENT agalow SEGMENT 10.11110 SEGMENT 0 SEGMENTP LOWER KIRBY PEARLAND MANAGEMENT DISTRICT PEARLAND MUNICIPAL MANAGEMENT DISTRICT NO. 1 CITY OF PEARLAND DRAINAGE PLAN REVIEW FEE CITY OF PEARLAND PLAN REVIEW FEE COST Projects 10 acres or Tess $ 1,000 Projects greater than 10 acres and up to 20 acres $ 2,000 Projects greater than 20 acres $ 3,000 LJA Engineering, Inc. W:\Land\2209\00001Agreements\Lower Kirby MDP COP Review Fee.xlsx LJA Engineering, Inc. LOWER KIRBY PEARLAND MANAGEMENT DISTRICT PEARLAND MUNICIPAL MANAGEMENT DISTRICT NO. 1 FINANCING AGREEMENT PROJECTS SUMMARY OF COSTS FEBRUARY 6, 2014 ITEMS COSTS Drainage System $ 5,064,844 Water System $ 622,656 Sanitary Sewer System $ 885,938 Detention Ponds $ 13,395,313 Water, Sewer, Drainage Total $ 19,968,750 Streets $ 5,851,563 Electric $ 5,596,875 Traffic Items $ 2,457,813 Streetscape and Sidewalks $ 4,212,500 Street Total $ 18,118,750 Contingencies (10%) $ 3,808,750 Engineering and Testing (18%) $ 6,855,750 TOTAL $ 48,752,000 W:1Land12209100001Agreements\Lower Kirby LFA Costs 2-6-14.xisx CcaN nrs ma. s0 tem we mo Per TOM Nm' "Ms...vows ows PmT'nI nema..asa.r m 1.1.1.111 IWINO n ca mo Arm a bs ImR.xa IP i.14,10i.14,10a ya ./1C1 veraciNIM. a Tr a.. GYN Sox. R111 Paa.ay'aNs -Paw °swims m+o tPu. RTROWUCS'S IMPROVEMENTS RMOMEMEN-S PROs ';ED DETENtwl. LOWER KIRBY REGIONAL DETENTION FACILITY MITIGATION PLAN ANO IMPACT ANALYSIS IMaROvEESENT SMARES WA Engineering, Inc. 114 Regional Detention Facility Construction Cost Estimate Lower Kirby Pearland Uanaoement District 'Item Description Quantity Unit Unit Cost Percent of District Cost % Break Up ROW Acquisition 32 AC 64.000 72% $ 1,480,704.00 ROW Already Acquired (39 ac) ' 1 LS $ 1,890,307 72% $ 1,366,691.96 Mobilization (5%) 1 LS $ 413,010 72% $ 298,606.09 Structural Excavation and Placement 769887 CY $ 8.00 72% $ 4.453.026.41 CONC BOX CULV (10FTX8FT) Future Riley Road Box Crossing 154 LF 450 72% $ 50,103.90 CONC BOX CULV (10FTX1OFT) Future Spectrum Road Box Crossing 300 LF 550 72% $ 119,295.00 CONC BOX CULV (12FTX8FT) Connection from Prudential Tract 2400 LF 450 0% $ - CONC BOX CULV (8FTX8FT) Box to replace existing Kirby ditch 2442 LF 400 100% $ 976,800 CONC BOX CULV (8FTX8FT) (West) Box to capture 100 -YR on W side of Kirby 2000 LF 400 100% $ 800,000 RC PIPE (CL !H) (72 !N) Outfall from South Basin to Clear Creek 300 LF 300 72% $ 65,070.00 Continency (20%) 1 LS $ 1,652,039 72% $ 1.194,424.34 Engineering (12%; 1 LS $ 991,224 72% $ 716.654,60 Total Construction Cost $ 11,521,376.30 Service Area Volume 334 AC -FT i Cost per Service AC -FT $ 34,495 4rea and cost Cased on acfual cost information provided by C ty of ear an 2/5/2014 Regional Detention Facility Construction Cost Estimate D ' t' t 1 c�l,ct is nc reanana wur c,pai raiaudy„ Quantity Unit Unit Cost Percent of District Cost % Break Up Item Description ROW Acquisition 32 AC 64.000 28% $ 567.296.00 ROW Already Acquired (39 ac) ' 1 LS 1,890,307 28% $ 523,615.04 Mobilization (5%) 1 LS $ 378.170 28% $ 104,753 Structural Excavation and Placement 769887 CY $ 8.00 28% $ 1,706,070 CONC BOX CULV (10FTX8FT) Future Riley Road Box Crossing 154 LF 450 28% 5 19,196 CONC BOX CULV (10FTX10FT) Future Spectrum Road Box Crossing 300 LF 550 28% $ 45,705 CONC BOX CULV (12FTX8FT) Connection from Prudential Tract 2400 LF 450 100% $ 1.080.000 CONC BOX CULV (8FTX8FT) Box to replace existing Kirby ditch 2442 LF 400 0% 5 - CONC BOX CULV (8FTX8FT) (West) Box to capture 100 -YR on W side of Kirby 2000 LF 400 0% $ - RC PIPE (CL Ili) (72 IN) Outfall from South Basin to Clear Creek 300 LF 300 26% $ 24,930.00 Contingency (20%) 1 LS $ 1,512,679 28% 5 419,012 Engineering (12%) 1 LS $ 907,608 28%1 $ 251.407 Total Construction Cost $ 4,741,984 I Service Area Volume 128 AC -FT I Cost per Service AC -FT $ 37,047 Area and cost based on actual cost information provided by City of Pearland 2/5/2014 LOWER KIRBY PEARLAND MUNICIPAL MANAGEMENT DISTRICT BOUNDARY MAP FEBRUARY, 2014 PEARLAND MUNICIPAL MGMT DIST 1 O LOWER KIRBY PEARLAND MGMT DIST PHASE BOUNDARY inch = 700 feet AERIAL TIOTOGRAPM DAIS: MAREN 2012 1.203 Nan rNs note pelnon nacifswy a Yv.vaN Pe informal oo:. V Nem. Niontied to rwtlgr c y ,,araxeiviio N Pr arta co Pt:conprr, dace e.,e n zlla LEGEND L—� ICPR Lo, CFR NDOE PROPOSED L'5tENTrON LOWER KIRBY REGIONAL DETENTION FACILRY MRIOATION PLAN ANO IMPACT ANALYSIS PROPOSED IMPROVEMENTS WA Engineering, Inc. LA Resolution No. R2014-024 Exhibit "B" LJA Engineering, Inc. LOWER KIRBY PEARLAND MANAGEMENT DISTRICT PEARLAND MUNICIPAL MANAGEMENT DISTRICT NO. 1 FINANCING AGREEMENT PROJECTS SUMMARY OF COSTS FEBRUARY 6, 2014 ITEMS COSTS Drainage System $ 5,064,844 Water System $ 622,656 Sanitary Sewer System $ 885,938 Detention Ponds $ 13,395,313 Water, Sewer, Drainage Total $ 19,968,750 Streets $ 5,851,563 Electric $ 5,596,875 Traffic Items $ 2,457,813 Streetscape and Sidewalks $ 4,212,500 Street Total $ 18,118,750 Contingencies (10%) $ 3,808,750 Engineering and Testing (18%) $ 6,855,750 TOTAL $ 48,752,000 Exhibit A W:\Land\2209\0000\Agreements\Lower Kirby LFA Costs 2-6-14.xlsx