R-2013-159-2013-10-14RESOLUTION NO. R2013-159 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING A CONTRACT AMENDMENT FOR ENGINEERING DESIGN SERVICES ASSOCIATED WITH THE BAILEY ROAD PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract amendment for engineering design services associated with the Bailey Road Project, a copy of which is attached hereto as Exhibit "A@ and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract amendment for engineering design services associated with the Bailey Road Project. PASSED, APPROVED and ADOPTED this the 14th day of October, A.D., 2013. TOM REID MAYOR ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Resolution No. R2013-159 Exhibit "A" CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive Pearland, Texas 77581 www.cityofpearland.com/projects Professional Services Contract Amendment For Bailey Road Widening - -4000' West of FM1128 to Veterans Drive Date of Issuance: 14 -Oct -13 Consultant: CDM Smith Explanation: This change order encompasses the following: Amendment No.: CoP Project No.: P.O. No.: 6 T08002 083133 Description of Work Cost Time Plan revisions to modify work along FM 1128 and drainage at 1 Veterans Dr. Additional environmental work and noise study updates are also necessary to comply with federal funding requirements now applicable to the project. $ 393,775.00 2 $ 3 4 Please attach back-up documentation 1095 Days Days Days Days Cost & Time Change Summary Cost Time Original Contract: $ 1,710,346.00 455 Days Previous Change Order(s): $ 138,339.00 104 Days Contract prior to this change order: $ 1,848,685.00 Days Net increase (decrease) from this change order $ 393,775.00 1095 Days Revised Contract: $ 2,242,460.00 1654 Days Finance Approval: - ACCEP D*: APPROVES: By: nsultant Date: (A -I jJ By Date: Rya.' 3 ate: 1 0/21 /1 3 Owner Bill Eisen City Manager *Contractor agrees to perform change(s) included in this Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed. No payment to the Contractor (or Consultant) shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent, this Change Order governs, Upon execution by all parties, the following changes identified for the Contract Value and/or Contract Time shown, are made part of the Contract. Design 1 of 1 16. Revised 7/25/08 Smith 3050 Post Oak Blvd., Suite 300 Houston, TX 77056 tel: 713 423-7300 fax: 713 840-0173 September 18, 2013 Ms. Cara Davis City of Pearland 3519 Liberty Dr. Pearland, TX 77581 Subject: Bailey Road Widening Scope and Fee Proposal FM 1128 to Veterans — Project Number T08002 Amendment No. 6 for TxDOT/FM 1128 Revisions and Environmental Services Dear Cara: Recommendations Bailey Road improvements between FM 1128 and Veterans Road recently received 80 percent federal funding. After meeting with TxDOT representatives, it was determined that NEPA process is now required. Due to the fact that this is an added capacity project, a full Environmental Assessment (EA) will be required to comply with Federal funding requirements. Bailey Road completed plans and specifications were provided to the City of Pearland in May, 2011. The sealed plans were then sent to TxDOT for formal review and comments. Comments were received from TxDOT on the Bailey Road plans that had a significant impact on the design and construction cost of the project. A meeting was held with the City of Pearland on July 2, 2013 to discuss alternatives. It was decided in the meeting that the team would pursue design changes that would remove any FM 1 128 widening and limit the work performed in State ROW to the minimum. WATER + ENVIRONMENT +TRANSPORTATION + ENERGY + FACILITIES C0 Smith Ms. Cara Davis September 18, 2013 Page 2 Supplemental Work Justification Changes to the plans are required to remove requirements for the work along FM 1128 and to modify drainage plans at Veterans Drive. CDM Smith team members respectfully request extra hours and compensation to fully cover these services which include the following additional work in scope and fee for project re -start: o Revisions to the intersection of FM 1 128 to avoid widening and improvements along that corridor o Environmental/NEPA work- CDM Smith included Klotz Associates on team to assist with EA o Modify drainage improvements at the eastern limit to reflect property acquisition on southwest comer of Veterans Drive intersection o Construction of 10' mixed use sidewalk on north side of Bailey instead of 8' sidewalk included in current plans per TxDOT criteria o Update of Noise Study completed by CDM Smith to comply with current standards o Attend DCC meeting to confirm design standards meet State/Federal requirements o Update TxDOT standards that have evolved over the interim o Address TxDOT 90% and Final comments o Revise signal at FM 1128 to match revised intersection plans o Field visits to update visual survey of driveways along Bailey Road Supplemental Work Scope Refer to Appendix 'A' for the additional scope of services. Supplemental Work Fee The original contract was signed on August 20, 2008 and approved by the Pearland City Council on August 25, 2008. Notice to Proceed came September 15, 2008. The CDM Smith team respectfully requests supplemental compensation of $ 393,775 be added to the amended total fee of $1,848,685 for this additional work (See Contract Summary). Smith Ms. Cara Davis September 18, 2013 Page 3 A breakdown of the supplemental amount requested is provided in Appendix `B'. In addition to compensation, the team requests contract termination date is extended to September 30, 2016 to address the additional work and include construction phase services. Please review the enclosed material and revised supplemental fee request. Thank you for your consideration of this request. Please contact me if you have any questions regarding this material. Yours sincerely, 7/ w, 4/4t4. -- Mark W. Litzmann, P.E. Project Manager Smith Ms. Cara Davis September 18, 2013 Page 4 Contract Summary Firm Bailey Road W. of FM 1128 to Veterans Fee Schedule Summary of All Phases All Consultants Original Contract Management Basic Additional Total Original 9/20/2013 1 of 8 Amount Amount Amount Amount Wilbur Smith Associates $148,945 $139,136 $291,853 $579,934 IDC, Inc. $33,084 $441,764 $25,884 $500,732 Dannenbaum Engineering Co. $336,186 $32,656 $368,842 SUBTOTAL $182,029 $917,086 $350,393 $1,449,508 CL Davis $167,800 $167,800 Surveying and Mapping $26,000 $26,000 Clark Condon $59,948 $59,948 HVJ $7,090 $7,090 TOTALS $182,029 $917,086 $611,231 $1,710,346 Original 9/20/2013 1 of 8 Bailey Road W. of FM 1128 to Veterans Fee Schedule All Consultants Amendment 1 - Side Road Transitions Firm Lump Sum Additional Lump Sum Total SA1 9/20/2013 2 of 8 Amount Amount CDM Smith $20,275 $20,275 IDC, Inc. $13,518 $13,518 Dannenbaum Engineering Co. $11,980 $11,980 SUBTOTAL $45,773 $45,773 CL Davis $4,053 $4,053 Surveying and Mapping $0 Clark Condon $0 HVJ $0 TOTALS $49,826 $49,826 SA1 9/20/2013 2 of 8 Bailey Road W. of FM 1128 to Veterans Fee Schedule All Consultants Amendment 2- Survey for Additional ROW Parcels Firm Lump Sum Additional Lump Sum Total SA2 9/20/2013 3 of 8 Amount Amount CDM Smith $0 $0 IDC, Inc. $0 $0 Dannenbaum Engineering Co. $0 $0 SUBTOTAL $0 $0 CL Davis $12,000 $12,000 Surveying and Mapping $0 Clark Condon $0 HVJ $0 TOTALS $12,000 $12,000 SA2 9/20/2013 3 of 8 Bailey Road W. of FM 1128 to Veterans Fee Schedule All Consultants Amendment 3 - Additional Landscape Services Firm Lump Sum Additional Lump Sum Total SA3 9/20/2013 4 of 8 Amount Amount CDM Smith $0 $0 IDC, Inc. $0 $0 Dannenbaum Engineering Co. $0 $0 SUBTOTAL $0 $0 CL Davis $0 $0 Surveying and Mapping $0 Clark Condon $1,200 $1,200 HVJ $0 TOTALS $1,200 $1,200 SA3 9/20/2013 4 of 8 Bailey Road W. of FM 1128 to Veterans Fee Schedule All Consultants Amendment 4 - Additional Drainage Studies Firm Lump Sum Additional Lump Sum Total SA4 9/20/2013 5 of 8 Amount Amount CDM Smith $2,800 $2,800 IDC, Inc. $0 $0 Dannenbaum Engineering Co. $22,620 $22,620 SUBTOTAL $25,420 $25,420 CL Davis $0 $0 Surveying and Mapping $0 Clark Condon $0 HVJ $0 TOTALS $25,420 $25,420 SA4 9/20/2013 5 of 8 Bailey Road W. of FM 1128 to Veterans Fee Schedule All Consultants Amendment 5 - Drainage Revisions to Add Larger Trunkline Firm Lump Sum Additional Lump Sum Total SA5 9/20/2013 6 of 8 Amount Amount CDM Smith $8,850 $8,850 IDC, Inc. $10,850 $10,850 Dannenbaum Engineering Co. $29,800 $29,800 SUBTOTAL $49,500 $49,500 CL Davis $0 Surveying and Mapping $0 Clark Condon $393 $393 HVJ $0 TOTALS $49,893 $49,893 SA5 9/20/2013 6 of 8 Bailey Road W. of FM 1128 to Veterans Fee Schedule All Consultants Amendment 6 - Prepare Environmental Assessment and Remove FM 1128 Widening Firm Lump Sum Additional Lump Sum Total SA6 9/20/2013 7 of 8 Amount Amount CDM Smith $100,895 $100,895 IDC, Inc. $60,628 $60,628 Dannenbaum Engineering Co. $37,570 $37,570 SUBTOTAL $199,093 $199,093 CL Davis $0 $0 Surveying and Mapping $0 $0 Clark Condon $1,650 $1,650 HVJ $0 $0 Klotz Associates $193,032 $193,032 TOTALS $393,775 $393,775 SA6 9/20/2013 7 of 8 irm Bailey Road W. of FM 1128 to Veterans Fee Schedule Summary of Lump Sum vs. Hourly Fees All Consultants Total Through Amendment 6 Original Lump Sum Fees Amended Total Construction Lump Sum Phase Fees Services* Total Fees *Note - All construction phase services shall be paid on an hourly basis plus actual expenses Summary 9/20/2013 8 of 8 Amount Amount Amount Amount CDM Smith $514,434 $647,254 $65,500 $712,754 IDC, Inc. $473,264 $558,260 $27,468 $585,728 Dannenbaum Engineering Co. $347,042 $449,012 $21,800 $470,812 SUBTOTAL $1,334,740 $1,654,526 $114,768 $1,769,294 CL Davis $167,800 $183,853 $183,853 Surveying and Mapping $26,000 $26,000 $26,000 Clark Condon $44,488 $47,731 $ 15,460.00 $63,191 HVJ $7,090 $7,090 $7,090 Klotz Associates $0 $193,032 $ - $193,032 TOTALS $1,580,118 $2,112,232 $130,228 $2,242,460 *Note - All construction phase services shall be paid on an hourly basis plus actual expenses Summary 9/20/2013 8 of 8 smith Ms. Cara Davis September 18, 2013 Page 5 Appendix 'A' Scope Bailey Road — FM 1128 to Veterans Additional Scope of Transportation Services CDM Smith Consultant Team Supplemental Number 6 Management Services (CDM Smith) The following services will be added to the contract for the oversight of work by sub consultants in Supplemental Number 6. Additional overall management including: daily coordination, team meetings, FTP site, project scheduling, review progress reports/invoices. Review QC/QA plans, QC/QA audits, status payments. This includes total management of all sub consultants. Also, management services for coordination with TxDOT, city of Pearland and environmental subconsultant which include attending external meetings including public meeting. The meetings will include two for design changes and six additional progress meetings concerning the environmental effort. Additional work for plan assembly for 90% and final submittals and coordinating signing of the revised mylars. Additional management of the design phase services which include revising Project Manual, address comments by TxDOT and City, revise construction cost estimate, update standards and coordinate submittals with other entities. Traffic Control Plans (CDM Smith) Revise traffic control plans to eliminate improvements to FM 1128. Delete the following drawings: • FM 1 128 Phase IA — Temporary Widening (1 Sheet) • FM 1128 Phase IB, Step 1 & Step 2 (6 Sheets) • FM 1128 Phase II, Step 3 & Step 4 (6 Sheets) • FM 1128 Phase IIIC — Step 5 (1 Sheet) Revise the following drawings: • FM 1128 -Phase IB -Storm Sewer Construction (1 Sheet) • Phase IA, Phase IB, Phase II, Phase III drawings at Bailey/1128 intersections (4 Sheets) Renumber Sheets 53-162. Add Standard Drawings for ACP overlay 1 of 11 Revise Quantities Traffic Signal Plans (CDM Smith) The proposed modification to the roadway plans at the intersection of Bailey Road and FM 1128 would impact the temporary and permanent traffic signal plans for this intersection. This supplemental would update the following traffic signal plans: • Temporary Signal Plan Layout (Bailey Rd at FM 1128) — 12 sheets • The temporary signal plans will be revised to reflect the updates to the traffic control at this intersection. • Permanent Signal Plan Layout (Bailey Rd at FM 1128) — 3 sheets • The permanent signal plans will be revised to reflect the updates to the roadway, utility and drainage plans. • Quantities and estimates — 1 sheet • The quantity summary sheet for the traffic signal plans will be updated to reflect the revisions to the plan set. Roadway Design Services (IDC) Roadway Design Services Modify final design to eliminate proposed roadway improvements for FM 1128. FM 1128 will remain as asphalt pavement with widening at the radius of return areas only. Existing pavement of FM 1128 within the right-of-way will then have the asphalt overlay. Permanent traffic signal and wheelchair ramps in ADA compliance are proposed at the FM 1128 and Bailey Road intersection. Modify roadway design to revise sidewalk from 8 ft to 10 ft. This impacts the proposed typical sections, roadway P&P sheets, street lighting plans, and earthwork cross sections. Because of these changes, the following drawings are impacted and need to be modified, and the quantities have to be reviewed, checked, and updated: • Index of sheets (2 sheets) • Bailey Road proposed typical sections (4 sheets & add 1 sheet) • FM 1128 existing typical sections • FM 1128 proposed typical sections • Summary of roadway removal quantities • Summary of pipe removal quantities • Summary of roadway quantities (2 sheets) • Summary of driveway • Summary of small signs • Summary of pavement marking quantities • Summary of SW3P quantities • Bailey Road storm water pollution prevention plan • FM 1128 Storm water pollution prevention plan • Bailey Road demolition plan 2 of 11 • FM 1128 demolition plan (delete) • Bailey Road horizontal alignment layout • FM 1128 horizontal alignment layout • Bailey Road plan and profile drawings (30 sheets) • FM 1128 plan & profile drawing • Bailey Road contour grading plan at FM 1128 • Bailey Road existing utility layout • FM 1128 utility sketch, 8" waterline (delete) • Bailey Road street lighting plan (5 sheets) • Bailey Road signing and pavement marking layout • FM 1128 signing and pavement marking layout • Revise earthwork cross-sections Preliminary Engineering Services FHWA rules will require an environmental document be prepared, to include 2 alternative alignments in addition to the preferred alignment. Scope includes preparing 2 new geometric alignments, and updating the existing schematic. These alignments will be included in the ENV document. A public meeting will be conducted to support the ENV process. Scope includes preparing exhibits, attending 1 preparation meeting with TxDOT and City staff, and attending 1 public meeting and setting -up exhibits for the meeting. Drainage Design Services (DEC) Due to comments from TxDOT at the intersection of FM 1128 and Bailey Rd, The City of Pearland decided to minimize work around the intersection. In summary, the concrete paving for Bailey Rd will stop at the west and east ends of the curb radii. Particular for drainage, it is our understanding that the existing storm sewer layout at the intersection will be modified as little as practicable. Also, the sidewalk is going to be expanded from 8 ft. to 10 ft. The proposed roadside ditch will be affected along the road. Once, the current drainage plan is modified, it will have a ripple effect on the other calculations/ drainage including pipes and drainage quantities, temporary drainage/traffic control, hydraulic data sheets, and plan and profile sheets. Number of Sheets Title 17 Update Computations/Hydraulic Data Sheets 39 Plan and Profile Sheets 39 Temporary Drainage Update 10 Updating Drainage Quantities 3 of 11 Landscape Architectural Services (CCA) Revise planting and irrigation sheets to reflect the revised limits of work. Adjust irrigation plans to reflect independent electrical service drop to feed proposed irrigation controller. Environmental Report Services (Klotz Associates) The work to be performed by Klotz Associates, Inc. (Engineer) under this contract consists of providing engineering services required for the preparation of an Environmental Assessment (EA) and public involvement for approximately 2.5 miles of Bailey Road from FM 1128 to Veteran's Drive in the City of Pearland. The project consists of widening Bailey Road from a two lane undivided roadway with open ditches to a four lane divided curb and gutter roadway with open ditches and a sidewalk. A. Environmental Document The services to be provided by the Engineer include preparation of an EA document and public involvement. The EA will be prepared in accordance with current Texas Department of Transportation (TxDOT) and Federal Highway Administration (FHWA) regulations, guidelines, standards, and criteria as of the date of this Scope of Services. All work on the project shall conform to the applicable requirements of TxDOT and FHWA. All work to be performed shall be subject to review and approval by the City of Pearland, TxDOT and FHWA. The work required is described below according to each task to be performed. Task 1 — Data Collection The Engineer shall collect and review available data pertaining to this project and the project area. The Engineer shall gather information for the existing conditions such as existing facility and roadway network, land use and demographics. The Engineer shall collect, review and evaluate available and appropriate data pertaining to the project area, including but not limited to, land use maps, aerial photography as available, demographic maps, census information, historical and archeological site listings, Potential Archeological Liability Map (PALM), digital orthophoto quadrangle maps, national wetland inventory maps, floodplain maps, Brazoria County Soil Survey, hazardous materials database information, traffic data for existing year and proposed design year, proposed letting schedule, accident data, design study report, drainage report, and any other pertinent information related to this proposed project. The 4of11 schematic design and other design drawings needed to complete the EA will be collected from others. Task 2 — Right -of -Entry Letters Any needed right -of -entry for this project will be provided by others. Task 3 — Agency Coordination Letters The Engineer shall prepare and send coordination letters to Texas Parks and Wildlife Department and Brazoria County Historical Commission. Task 4 — Project Scope for Environmental Review Documents The Engineer shall complete the Project Scope for Environmental Review Documents and attend up to two meetings with TxDOT/Pearland regarding this checklist. This task shall include revising the checklist per four sets of comments from TxDOT. Task 5 — Alternatives Analysis The Engineer shall prepare an alternatives analysis of the no -build alternative and the following three (3) possible build alternatives: 1) Acquiring all of the proposed ROW from the north side, 2) Acquiring all of the proposed ROW from the south side, and 3) Acquiring varying amounts of ROW from both sides. The alternatives will be evaluated using data collected under Task 1, accident data (if available) and property ownership information from the Brazoria County Appraisal District. The alternatives analysis will consider the following: hazardous materials, National Wetlands Inventory (NWI) wetlands, cultural resources, floodplains, residences, businesses, utilities, and threatened and endangered species habitats. In addition, the 2010 Census data shall be collected pertaining to population, ethnicity, income levels, and Limited English Proficiency (LEP) down to the lowest level available (census, block, group) for the three build alternatives. This data shall be used to evaluate and assess any differentiable impacts to minority, low income, and LEP populations from the alternatives. The Alternatives Analysis section of the EA shall be prepared to document the data sources, methodology, and potential impacts for each alternative. An evaluation of the feasible alternatives shall be performed using the following criteria: • Need and Purpose for the Project • Costs • Impacts to environmental resources The three (3) build alternatives shall be evaluated at an equal level of detail and a preferred build alternative will be selected and carried forward for detailed analysis in the EA along with the no -build alternative. Only the one preferred alternative will be carried forward for detailed analyses in the EA. 5 of 11 Task 6 — Noise Analysis A noise analysis for the proposed Bailey Road widening project has been previously conducted by CDM Smith. CDM Smith will update the noise analysis based on FHWA's noise regulation changes under 23 CFR 772 that went into effect on July 13, 2011, TxDOT's "Guidelines for Analysis and Abatement of Roadway Traffic Noise" dated April 2011 and TxDOT's Standards of Uniformity (SOU) for Traffic Noise Analysis dated October 2011. CDM will also update the TNM 2.5 files with recently updated traffic volumes. Klotz Associates work under this task includes performing QA/QC review of the TNM 2.5 files. Task 7 — Mobile Source Air Toxics Analysis Since the existing traffic volumes and the projected design year traffic volumes do not exceed 140,000 vehicles per day, this project is not likely to meaningfully increase Mobile Source Air Toxics (MSAT) emissions. Therefore, a quantitative MSAT analysis shall not be conducted but a qualitative MSAT analysis shall be conducted and the results documented in the EA in accordance with TxDOT's 2006 Air Quality Guidelines, Air Quality Guidelines MSAT addendum dated October 3, 2011, Air Quality SOU dated August 31, 2011, and Air Quality Standard Operating Procedure dated September 1, 2011. Task 8 — Air Quality Analysis Since the existing traffic volumes and the projected design year traffic volumes do not exceed 140,000 vehicles per day, a Traffic Air Quality Analysis shall not be required. Standard recommended template language per TxDOT's Air Quality SOU shall be used in the EA. Task 9— Indirect and Cumulative Impact Analyses Perform an Indirect Impacts Analysis and Cumulative Impacts Analysis in accordance with TxDOT's Revised Guidance on Preparing Indirect and Cumulative impact Analyses dated September 2010. The analysis and results will be documented in the EA. Task 10 — Cultural Resources Archeological Resources Terracon will prepare text discussing pertinent information with respect to the Archaeological Survey performed by Terracon and Archaeological Survey Report written by Terracon in 2009. Terracon will also incorporate all necessary information as outlined in TxDOT's SOU for Archeological Resources for EAs. The text will include information regarding the survey methodology and findings, Texas Historical Commission (THC) coordination, and THC approval. Terracon will additionally prepare the Project Coordination Request (PCR) for Archeological Studies form required by TxDOT for EAs. It is Terracon's understanding that the area previously surveyed for the presence of archeological resources is the same area for the proposed Bailey Road Widening Project. The THC has approved the survey and has stated that the project may proceed. Therefore, additional archeological surveying is not anticipated and is not included as part of this scope. 6of11 Historic Resources AmaTerra shall prepare a Non -Archeological Historic Resources Project Coordination Request (October 2009 version) for review and comment by TxDOT-ENV. If required by TxDOT, AmaTerra shall prepare a research design for review and comment by TxDOT-ENV. The research design shall conform to TxDOT Research Design SOU: Non -Archeological Historic -Age Resource Research Designs Review Checklist (October 2009 version). AmaTerra shall perform a reconnaissance survey conforming to the methodology outlined in Appendix B of the Draft CRM Guide for Accurately Identing Non - Archeological Cultural Resources (Texas Department of Transportation, April 2006). The survey shall document each historic -age resource (defined by TxDOT as a building, structure, object, historic district or non -archeological site at least 45 years old at the time of letting) within the Study Area. The Study Area shall consist of the Area of Potential Effects (APE) plus all parcels that are wholly or partially within the APE. AmaTerra shall provide a report detailing the results and findings of the reconnaissance survey including effects to historic properties and the need, if any, to conduct intensive survey efforts. The report shall have sufficient detail and clarity to provide THC with the basis for making determinations of National Register of Historic Places (NRHP) eligibility or shall have sufficient detail and clarity to make recommendations concerning the scope of the intensive survey. The report shall conform to the TxDOT Standards of Submission for Non -Archeological Historic -Age Resource Reconnaissance Survey Reports Review Checklist (October 2009 version). Task 11 — Socioeconomic and Environmental Justice The 2010 Census data collected under Task 1 will be used for population, ethnicity, income levels, and Limited English Proficiency (LEP) down to the lowest level available (census, block, group). This data shall be used to evaluate and assess any impacts to minority, low income, and LEP populations. The Engineer shall also prepare a baseline inventory consisting of existing community conditions in order to address social effects on the project area encompassing any effects on neighborhoods and communities, including travel patterns and accessibility, impacts on schools, places of worship, businesses and recreation and social (public) groups. Neighborhood cohesiveness shall be identified through physical features and socioeconomic profiles in order to complete a community impact analysis. Task 12 — Other Environmental Studies, Analyses and Investigations Conduct other environmental studies, analyses and investigations in accordance with FHWA/TxDOT requirements. The other environmental studies, analyses and investigations are shown below: a) Land Use: The Engineer shall conduct a field visit to document and confirm land use. 7of11 b) Water Resources: The Engineer shall document compliance with Section 402 of the Clean Water Act (CWA): Texas Pollutant Discharge Elimination System (TPDES), Construction General Permit (CGP) requirements. The Engineer shall identify any impaired waters using the Texas Commission on Environmental Quality (TCEQ) 2010 Section 303(d) Clean Water Act list (approved November 18, 2011) of impaired waters. c) Floodplains: The Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM) for Brazoria County shall be analyzed with respect to the proposed project and the information documented in the EA. This task includes preparing an exhibit to include any 100 year floodplain locations. d) Vegetation Inventory: The Engineer shall assess the proposed project vegetation. The vegetation discussion shall include a general description of the vegetation types as described in the Texas Parks and Wildlife Department (TPWD) Vegetation Types of Texas (TPWD, 1984). The vegetation discussion shall also comply with the Memorandum of Agreement (MOA) and the Memorandum of Understanding (MOU) between TxDOT and TPWD. e) Visual: A field investigation shall be conducted to determine the potential visual impacts resulting from the proposed project. f) Construction Impacts: The Engineer shall assess the proposed project for construction detours and temporary construction impacts. g) Invasive Species and Beneficial Landscaping Practices: Executive Order 13112 on invasive species and executive memorandum on beneficial landscaping practices shall be addressed in the EA. h) Migratory Bird Impacts: The Engineer shall address compliance with the Migratory Bird Treaty Act. i) Threatened and Endangered Species: The Engineer shall conduct threatened and endangered species habitat assessments using the U.S. Fish and Wildlife Service (USFWS) and TPWD threatened and endangered species list and shall conduct a Natural Diversity Database (NDD) search. The EA shall include revising the USFWS and TPWD lists up to three times. 8of11 It is assumed that the following tasks shall not be performed: analysis of soils, prime farmlands, U.S. Coast Guard Section 9 and U.S. Army Corps of Engineers Section 10, the Texas coastal management program, coastal barriers, Section 4(0 Evaluation, or U.S. Department of Interior's National Inventory of River Segments in the National Wild and Scenic River System. Task 13 — Wetland Determinations Wetland determinations and delineations were previously performed by Terracon for the proposed widening of Bailey Road that was part of the Cowart Creek Diversion Project which also included a new 3.2 mile long drainage channel that began at Bailey Road and extended south and east on new location to a new detention pond. The U.S. Army Corps of Engineers (USACE) issued a Nationwide Permit (NWP) 43 on December 2, 2009 which authorized the entire Cowart Creek Diversion Project (including the widening of Bailey Road) and impacts to 0.2 acre of jurisdictional waters of the U.S. that were located along the new drainage channel. In addition, during the evaluation and issuance of NWP 43, the USACE determined that the existing open drainage ditches along both sides of Bailey Road are non jurisdictional and the conversion of these drainage ditches to enclosed underground storm sewers did not require a permit. Terracon will provide the necessary documentation to show that proposed widening of Bailey Road does not require any Section 404 permits from USACE and will prepare the wetland section of the EA. Task 14 — Hazardous Materials The Engineer shall conduct an initial hazardous materials assessment for the proposed project to identify sites within the project area that may have experienced soil and/or groundwater contamination by hazardous materials. The assessment shall consist of a review of regulatory/governmental agency database records and an onsite investigation. The regulatory database search should occur within the minimum search distances set by American Society for Testing and Materials (ASTM) E 1527-97. The results of the hazardous materials investigation shall be included in the EA. The Engineer shall also prepare the State's Hazardous Material Initial Site Assessment Form. Task 15 — Prepare Draft EA The Engineer shall prepare the Draft EA, including preparing exhibits. Copies of the Draft EA shall be prepared and submitted to the City of Pearland, TxDOT and FHWA on paper and a digital pdf file for review and comment. Task 16 — Revisions to Draft EA The Engineer shall revise the Draft EA in accordance with two sets of comments from the City of Pearland, four sets of comments from TxDOT and two sets of comments from FHWA. Deliverables: Draft EA Document (3 hard copies plus electronic copy). 9 of 11 Task 17 — Public Meeting a. Public Meeting Notice: The Engineer shall prepare the Notice of Public Meeting for publication in the Houston Chronicle and a Spanish newspaper for review and approval by TxDOT. The Engineer shall publish the Notice in the Houston Chronicle (in English) and the La Voz (a Spanish newspaper in Spanish) twice (30 days prior to the meeting and approximately 10 days prior to the meeting). The Notice shall also be mailed to all adjacent property owners and other identified interested citizens approximately 30 days prior to the meeting. The Engineer shall prepare letters to elected officials notifying them of the Public Meeting and submit the public officials letter to TxDOT. TxDOT shall print the letters on TxDOT letterhead and send to elected officials. This task shall also include identifying adjacent property owners and developing and maintaining a mailing list for public meeting notification. b. Prepare Exhibits for Public Meeting: The Engineer shall prepare exhibits to be displayed at the Public Meeting including a project location map, need and purpose, cost and schedule. The schematic layout and typical sections will also need to be displayed at the Public Meeting but these will be prepared by others. c. Conduct Public Meeting: The Engineer shall coordinate, schedule, organize, and conduct an open house Public Meeting. This task shall include preparing the program and sign -in sheets for elected officials, general public, and the media. A total of two staff members shall be provided to attend the meeting and to address questions from the public. The Engineer shall participate in three meetings prior to the Public Meeting to review the presentation materials and exhibits. The City of Pearland will identify, reserve, and provide the facility for the Public Meeting. d. Public Meeting Summary Report: The Engineer shall prepare and submit a Public Meeting Summary Report to TxDOT. The report shall contain the following information: o Program; o Sign -in sheets; o Public meeting notices; o Mailing list; o Written public comments; o Summary of the proceedings and public comments; and o Responses to written public comments received at the meeting or by the deadline e. Revise Public Meeting Summary Report: 10 of 11 The Engineer shall revise the public meeting summary report in accordance with one set of comments from the City of Pearland, two sets of comments from TxDOT and one set of comments from FHWA. Deliverables: Public Meeting Summary Report (3 hard copies plus electronic copy). Task 18 — Notice Affording Opportunity for Public Hearing Upon receiving Satisfactory for Further Processing from FHWA, the Engineer shall prepare the Notice Affording Opportunity for Public Hearing for publication in the Houston Chronicle, a local newspaper, and a Spanish newspaper for review and approval by TxDOT. The Engineer shall publish the Notice in the Houston Chronicle (in English), the La Voz (a Spanish newspaper in Spanish), and a local newspaper (in English), twice (30 days prior to the deadline for requesting a hearing and approximately 10 days prior to the deadline). The Notice shall also be mailed to all adjacent property owners and other identified interested citizens approximately 30 days prior to the deadline. This task also includes preparing the Certification of Notice Affording Opportunity for Public Hearing. This scope and fee does not include conducting a public hearing. Task 19 — Prepare Final EA After the deadline for requesting a Public Hearing and assuming no requests for a public hearing are received by the deadline, the final EA shall be prepared and submitted. Deliverables: Final EA Document (3 hard copies plus electronic copy). Task 20 — Prepare FONSI Document The Engineer shall prepare the Finding of No Significant Impact (FONSI) document for signature by FHWA. Deliverables: FONSI Document (3 hard copies plus electronic copy). Task 21 — Publication of FONSI Availability This task shall include preparing a notice of FONSI availability. This task includes a total of two sets of revisions (from the State) to the notice. Once approved, the notice shall be published one time in the Houston Chronicle and La Voz (Spanish newspaper). Deliverables: 1 copy of the notice of FONSI availability. B. Environmental Permits Issues and Commitments (EPIC) Sheets. The Engineer shall complete the latest version of the EPIC sheets per information provided by the City and State. 11 of 11 Smith Ms. Cara Davis September 18, 2013 Page 6 Appendix `B' Fee Bailey Road W. of FM 1128 to Veterans Fee Schedule Mangement Services CDM Smith 1 of 5 CDM Smith Basic Task Description No. of Sheets Hours Per Sheet Principal Sr PM Sr Engr Engr CADD Admin/Clerical Total Hours Total Labor $250 $215 $125 $110 $100 $70 40 0 40 2 $ 8,600 $ 430 1 Management (15 months) a SubConsultant Management b Coordinate signing of revised mylars 2 0 30 $ 4,275 c Progress reports (15) and invoices 15 15 40 $ 7,880 d Attend meetings(8) 0 32 8 8 $ 1,860 e Attend Public meeting 4 4 0 18 $ 3,580 f Project scheduling 16 2 28 $ 5,190 f Coordination with TxDOT 2 16 10 SUBTOTAL SHTS/HOURS 0 6 125 18 0 0 17 166 SUBTOTAL $1,500 $26,875 $2,250 $0 $0 $1,190 $ 31,815 2 Plan Assembly a Receive and re -compile revised pdfs on server 16 16 20 $ 1,600 $ 1,880 b Prepare files and coordinate rev mylar plots 16 4 8 $ 800 c Prepare cd/coordn reprinting of plansets 8 8 $ 800 d Reprint revised mylars/return to COP 8 SUBTOTAL SHTS/HOURS 0 0 0 0 0 48 4 52 SUBTOTAL $0 $0 $0 $0 $4,800 $280 $ 5,080 3 Design Phase Services a Review 90% and final plans 8 16 16 12 52 $ 6,680 $ 10,560 b Address comments by TxDOT and City 90% and Final 8 24 24 32 88 $ 4,410 c Revise Project manual and prepare bid package 8 10 8 8 34 1,660 d Review and update standards 4 8 12 $ 4,130 e Revise Engineers's cost estimate 2 8 16 8 2 36 $ 2,820 f Additional field visits to update topo and driveways 0 12 12 24 $ $ 660 g Coordinate submittals w/other entities 0 0 6 6 SUBTOTAL SHTS/HOURS 0 0 30 70 82 60 10 252 SUBTOTAL 50 $6,450 $8,750 $9,020 $6,000 $700 $ 30,920 TOTAL HOURS 0 6 155 88 82 108 31 470 TOTAL LABOR FOR ALL TASKS $1,500 $33,325 511,000 59,020 $10,800 $2,170 $ 67,815 1 of 5 CDM Smith Basic DIRECT EXPENSES TDLR Fees - Plan Review and Filing Fee Rates Amount $960.000 Mileage MI $0.505 1830 Deliveries EA $15.00 20 Roll plots SF $2.00 300 Copies - letter/legal EA $0.10 3000 Copies - 11x 17 EA $0.25 7500 Mylars - 11x17 EA $2.00 500 Mylars - 22x34 EA $12.00 $0 $925 $300 $600 $300 $1,875 $1,000 $0 $0 TOTAL DIRECT EXPENSES $5,000 Bailey Road W. of FM 1128 to Veterans Fee Schedule Mangement Services CDM Smith TOTAL LABOR FOR ALL TASKS (above) CDM Smith's TOTAL FEE (this task) CDM Smith's TOTAL FEE (TCP) CDM Smith's TOTAL FEE (TRAFFIC SIGNAL PLANS) CDM Smith's TOTAL FEE (CDM ENVIRONMENTAL) CDM Smith Basic $67,815 $72,815 $6,480 $6,790 $14,810 CDM Smith TOTAL $100,895 2 of 5 Bailey Road W. of FM 1128 to Veterans Fee Schedule TCP Revisions CDM Smith Task Description No. of Sheets Hours Per Sheet Principal Sr PM Sr Engr Engr CADD Admin/Clerical Total Hours Total Labor $250 $215 $125 $110 $90 $70 1 FM 1128 TCP Revisions a Revise Drawings 5 6.40 2 6 24 32 $ 3,820 b Renumber Sheets 110 0.04 4 4 $ 360 c Revise Quantities & Estimate 1 8 0 8 8 $ 1,000 d Add Standard Drawings 2 2.00 0 4 4 $ 440 e QC NA NA 4 4 $ 860 SUBTOTALSHTS/HOURS 118 0 0 6 14 28 4 0 52 SUBTOTAL $0 $1,290 $1,750 $3,080 $360 $0 $ 6,480 TOTAL LABOR FOR ALL TASKS (above) CDM Smith's TOTAL FEE (TCP Revisions) CDM Smith Basic $6,480 $6,480 3 of 5 Bailey Road W. of FM 1128 to Veterans Fee Schedule Traffic Signal Plans CDM Smith SA No. 6 CDM Smith Basic Traffic Signal Plans 4 of 5 Task Description No. of Sheets Hours Per Sheet Principal Sr PM Sr Engr Engr CADD Admin/Clerical Total Hours Total Labor $250 $215 $125 $110 $90 $70 1 FM 1128 a Temporary Traffic Signal Plans b Permanent Traffic Signal Plans c Quantities & Estimates 12 2 1 3 9 5 2 2 2 24 16 4 26 18 6 $ 3,430 $ 2,430 $ 930 SUBTOTAL SHTS/HOURS 15 3 0 6 44 0 0 0 50 SUBTOTAL $0 $1,290 $5,500 $0 $0 $0 $ 6,790 CDM Smith Basic Traffic Signal Plans 4 of 5 Bailey Road W. of FM 1128 to Veterans Fee Schedule Noise Analysis -Environmental Mgmt CDM Smith Task Description Sr PM Sr Env Engr CADD Admin/Clerica Total Hours Total Labor $215 $150 $110 $90 $70 Baliey Road 1 Sub Consultant Management (15 mos) 0 0 0 $ 2 Meetings (1) 4 4 $ 600 3 TxDOT Coordination 8 8 $ 1,200 4 Review of Alternatives Analysis 8 8 $ 1,200 5 Traffic & Accident Data 4 9 4 17 $ 1,530 6 Noise Modeling/Analysis 4 8 6 3 21 $ 2,230 7 Noise Barrier Modeling 8 8 6 22 $ 2,620 8 Noise write-up for EA 4 8 8 20 $ 2,040 9 Review of EA 2 8 16 26 $ 3,390 TOTAL HOURS 2 44 44 21 15 126 TOTAL LABOR FOR ALL TASKS 5430 $6,600 54,840 $1,890 51,050 $ 14,810 TOTAL LABOR FOR ALL TASKS (above) CDM Smith's TOTAL FEE (Environmental) CDM Smith Basic $14,810 $14,810 5 of 5 CITY OF PEARLAND BAILEY ROAD PAVING AND DRAINAGE IMPROVEMENT IDC PROPOSAL FOR PROFESSIONAL SERVICES REVISED ROADWAY PLANS DUE TO FM 1128 DESIGN CHANGES & FHWA DESIGN CRITERIA 9/17/2013 BASIC SERVICES Page 1 NO. OF SHEET RAW SALARY $70.00 $60.00 $46.67 $33.00 $26.00 (3.0 Multiplier) $210.00 $180.00 $140.01 $99.00 $78.00 SHEET NO. Principle in Project Manager Project Engineer Senior Designer CADD TOTALS Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Drawings that need modifications 2 1 Index of sheets $0.00 $0.00 1 $140.01 2 $198.00 8 $624.00 11 $962.01 3 1 Index of sheets $0.00 $0.00 1 $140.01 2 $198.00 8 $624.00 11 $962.01 New 1 Bailey Road proposed typical sections $0.00 $0.00 1 $140.01 3 $297.00 4 $312.00 8 $749.01 5 1 FM 1128 existing typical section $0.00 $0.00 1 $140.01 $0.00 2 $156.00 3 $296.01 8,9,10,11 4 Proposed Typical Sections $0.00 1 $180.00 4 $560.04 4 $396.00 8 $624.00 17 $1,760.04 12 1 FM 1128 proposed typical section $0.00 1 $180.00 3 $420.03 $0.00 4 $312.00 8 $912.03 21 1 Summary of roadway removal quantities incl. calculations $0.00 $0.00 2 $280.02 2 $198.00 4 $312.00 8 $790.02 22 1 Summary of pipe removal quantities $0.00 1 $180.00 1 $140.01 2 $198.00 $0.00 4 $518.01 23 1 Summary of roadway quantities incl. calculations $0.00 $0.00 2 $280.02 6 $594.00 10 $780.00 18 $1,654.02 24 1 Summary of roadway quantities incl. calculations $0.00 $0.00 2 $280.02 6 $594.00 10 $780.00 18 $1,654.02 26 1 Summary of driveway $0.00 $0.00 1 $140.01 2 $198.00 3 $234.00 6 $572.01 43 1 Summary of small signs $0.00 $0.00 1 $140.01 2 $198.00 3 $234.00 6 $572.01 44 1 Summary of pavement marking quantities incl. calculations $0.00 $0.00 2 $280.02 4 $396.00 4 $312.00 10 $988.02 45 1 Summary of SW3P quantities incl. calculations $0.00 1 $180.00 1 $140.01 2 $198.00 2 $156.00 6 $674.01 165 1 Bailey Road storm water pollution prevention plan layout $0.00 $0.00 1 $140.01 2 $198.00 2 $156.00 5 $494.01 179 1 FM 1128 Storm water pollution prevention plan layout $0.00 $0.00 1 $140.01 3 $297.00 3 $234.00 7 $671.01 187 1 Demolition plan, sta 93+50 to 103+50 $0.00 1 $180.00 1 $140.01 2 $198.00 2 $156.00 6 $674.01 202 1 Demolition plan, FM 1128 $0.00 $0.00 1 $140.01 2 $198.00 2 $156.00 5 $494.01 210 1 Bailey Road horizontal alignment layout $0.00 $0.00 1 $140.01 $0.00 2 $156.00 3 $296.01 215 1 FM 1128 horizontal alignment layout $0.00 $0.00 1 $140.01 $0.00 2 $156.00 3 $296.01 220 1 Bailey Road plan & profile, sta 100+00 to 105+00 $0.00 1 $180.00 3 $420.03 6 $594.00 6 $468.00 16 $1,662.03 218,219,221-246 29 Bailey Road plan & profile, Begin to End $0.00 2 $4.00 8 $1.120.08 8 $792.00 16 $1,248.00 34 $3,164.08 247 1 FM 1128 plan and profile, begin to end $0.00 1 $180.00 4 $560.04 8 $792.00 12 $936.00 25 $2,468.04 255 1 Bailey road contour grading plan at FM 1128 $0.00 1 $180.00 1 $140.01 4 $396.00 2 $156.00 8 $872.01 366 1 Bailey Road existing utility layout, sta 95+00 to 105+00 $0.00 $0.00 1 $140.01 $0.00 2 $156.00 3 $296.01 470 1 Bailey road street lighting plan, sta 95+00 to 105+00 $0.00 $0.00 1 $140.01 1 $99.00 1 $78.00 3 $317.01 473476478.479482. 5 Bailey road street lighting plan $0.00 1 $180.00 4 $560.04 $0.00 5 $390.00 10 $1,130.04 486 1 Signing and pavement marking layout, sta 95+00 to 105+00 $0.00 1 $180.00 1 $140.01 2 $198.00 4 $312.00 8 $830.01 500 1 FM 1128 signing and pavement marking layout $0.00 1 $180.00 2 $280.02 4 $396.00 4 $312.00 11 $1,168.02 1 Set Revise Cross Sections $0.00 2 $360.00 24 $3,360.24 $0.00 12 $936.00 38 $4,656.24 1 Preferred Alignment Schematic $0.00 2 $360.00 8 $1,120.08 $0.00 12 $936.00 22 $2,416.08 1 Alternative Alignment No. 1 $0.00 6 $1,080.00 20 $2,800.20 20 $1,980.00 40 $3,120.00 86 $8,980.20 1 Alternative Alignment No. 2 $0.00 6 $1,080.00 20 $2,800.20 20 $1,980.00 40 $3,120.00 86 $8,980.20 Page 1 BAILEY ROAD PAVING AND DRAINAGE IMPROVEMENT IDC PROPOSAL FOR PROFESSIONAL SERVICES REVISED ROADWAY PLANS DUE TO FM 1128 DESIGN CHANGES & FHWA DESIGN CRITERIA 9/17/2013 BASIC SERVICES Page 2 NO. OF SHEET RAW SALARY $70.00 $60.00 $46.67 $33.00 $26.00 (3.0 Multiplier) $210.00 $180.00 $140.01 $99.00 $78.00 SHEET NO. Principle in Project Manager Project Engineer Senior Designer CADD TOTALS Public Meeting Prep $0.00 4 $720.00 4 $560.04 4 $312.00 12 $1,592.04 Attend Public Meeting $0.00 4 $720.00 6 $840.06 8 $624.00 18 $2,184.06 QA/QC review 2 $420.00 4 $720.00 12 $1,680.12 8 $792.00 4 $312.00 30 $3,924.12 67 TOTAL 2 41 148 _ 127 255 573 $60,628.48 Page 2 Bailey Road City of Pearland Additional Services - Amendment 6 CDM Smith Senior PM Sr Engr Engr CADD Admin/ Clerical $190 $150 $115 $85 $65 Hours Sheets MH/Sheet Labor Cost Expenses Total DEC 2 8 142 156 4 312 105 $31,430 $0 $31,430 Update Computations & Hydraulic Data (17 Sheets) Update Plan and Profile (39 Sheets) 24 24 48 17 3 $4,800 $4.800 60 70 130 39 3 $12,850 $12,850 Temporary Drainage Update (39 Sheets) Updating Quantities (10 Sheets) 30 30 60 39 2 $6,000 $6,000 16 16 32 10 3 $3,200 $3,200 Responding to TxDOT comments 90% 2 8 12 16 4 42 $4,580 $4,580 Meetings and Project Management Meetings, 2 @ 3 hours each QA/QC 6 20 6 8 2 42 0 $5,640 $500 $6,140 6 6 2 14 $1,960 $1,960 16 $2,400 $2,400 Mylar Signatures 4 8 $1,280 $1,280 Expenses - Mileage and Copies GRAND TOTAL $0 $500 $500 354 105 837,070 $500 $37,570 7/25/2013 H:\Design\102974-Bailey Rd\Contract Files\Bailey Rd re -start SWA #6\Bailey Rd re -start fee and scope DEC 2013 07 15\Amend6_7242013.xlsx 1 of 1 ATTACHMENT E FEE SCHEDULE (KLOTZ ASSOCIATES, INC.) METHOD OF PAYMENT: LUMP SUM September 20,2013 PRIME PROVIDER NAME: KLOTZ ASSOCIATES, INC. CONTRACT NUMBER: T08002 PROJECT NAME/CSJ: BAILEY ROAD FROM FM 1128 TO VETERAN'S DRIVE IN PEARLAND/0912/31-289 TASK DESCRIPTION SENIOR PROJECT MANAGER SENIOR ENGINEER PROJECT ENGINEER DESIGN ENGINEER EIT SENIOR CADD OPERATOR CADD OPERATOR ENVIRON. MANAGER SENIOR ENVIRON. PLANNER ENVIRON. PLANNER ADMIN/ CLERICAL TOTAL LABOR HRS. & COSTS ENVIRONMENTAL STUDIES & PUBLIC INVOLVEMENT A. ENVIRONMENTAL DOCUMENT 1 Data Collection 4 2 20 26 2. Right -of -Entry Letters 0 3 Agency Coordination Letters1 4 5 4. Project Scope for Env. Review Documents 4 48 52 5. Alternatives Analysis 12 48 60 6. Noise Analysis 12 12 7. Mobile Source Air Toxics Analysis 12 12 8. Air Quality Analysis 4 4 a Indirect and Cumulative Impact Analysis 16 100 24 140 10. Cultural Resources 6 6 12 11. Socioeconomic and Environmental Justice 8 40 48 12. Other Env. Studies, Analyses & Invest 0 a Land Use 2 32 34 b. Water Resources 1 8 9 c Floodplains 2 1 8 11 d. Vegetation Inventory 2 16 18 e. Visual 2 2 f. Construction Impacts 2 2 g Invasive Speaes and Beneficial Landscaping 2 2 h. Migratory Bird Impacts 2 2 i. Threatened and Endangered Species 2 20 22 13. Wetland Determinations 1 1 14. Hazardous Materials 4 40 44 15 Prepare Draft EA 32 20 112 164 16 Revisions to Draft EA 16 88 104 17. Public Meeting a Public Meeting Notice 1 20 21 b Prepare Exhibits for Public Meeting 244 24 52 c Conduct Public Meeting 24 64 88 d. Public Meeting Summary Report 16 56 72 e Revise Public Meeting Summary Report 4 16 20 18 Notice Affording Opportunity Public Heanng 2 16 18 19 Prepare Final EA 2 8 10 8 48 56 20 Prepare FONSI Document 21 Publication of FONSI Availability 3 16 19 B. EPIC SHEETS 8 40 48 DIRECT EXPENSES Units Rate/Unit Notes Mileage 700 $0.55 per mile $ 385.00 GPS Receiver 12 $20.00 per hour $ 240.00 Hazardous Materials Database Search 2.5 $350.00 per mile $ 875.00 Photocopies B/W (8 1/2 X 11) 2,500 $0.10 each $ 250.00 Photocopies B/W (11 X 17) 500 $0.15 each $ 75.00 Photocopies Color (8 1/2 X 11) 500 $0.85 each $ 425.00 Photocopies Color (11 X 17) 500 $1.75 each $ 875.00 Newspaper Advertisement (Houston Chronicle) 3 $2,000.00 per publication $ 6,000.00 Newspaper Advertisement (Spanish Paper La Voz) 3 $400.00 per publication $ 1,200.00 Texas Parks and Wildlife Data Request Fees 1 $75.00 each $ 75.00 Courier Services (Deliveries) 1 $35.00 each $ 35.00 Overnight Mail - Letter Size 2 $16.00 each $ 32.00 Standard Postage 250 $0.45 each $ 112.50 Histoncal Aenal Images 1 $100 per unit $ 100.00 Freedom of Information Act Request Fee from Corps 1 $20 per unit $ 20.00 Terracon - Subconsultant for Arch. and Wetlands 1 $5,100 $ 5,100.00 AaTen'a - Subconsultant for Histoncal Resources m 1 $8,819.85 $ 8.819.85 DIRECT EXPENSE SUBTOTAL $ 24,619.35 HOURS SUB-TOTALS 0 0 0 0 0 0 62 181 923 240 1190 RATE PER HOUR 190.00 150.00 125.86 113.58 95.16 90.00 76.74 175.00 140.00 115.00 61.39 TOTAL LABOR COSTS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,757.88 $31,675.00 $129.220.00 02,760.00 $0.00 $168,412.88 SUBTOTAL (FC120) $ 193,032.23 Schedule of Values AmaTerra Environmental, Inc. Bailey Road from FM 1128 to Veterans Drive Task 1: Non-Archeological Project Coordination Request LABOR Name PCR Environmental Documentation Admin Total Units Price Extension Historical Architect Tom Eisenhour 14.00 2.00 16.00 hrs $ 40.10 $ 641.60 Administrative Assistant Nancy Quincy 2.00 2.00 hrs $ 28.37 $ 56.74 GIS Specialist Joel Butler 3.00 3.00 hrs $ 23.95 $ 71.85 Subtotal Labor $ 770.19 Overhead (156.73%) $ 1,207.12 Profit (12%) $ 237.28 TOTAL LABOR $ 2,214.59 EXPENSES PCR Environmental Documentation Admin Total Units Price Extension Copies, b/w 55 20 75 each $ 0.10 $ 7.50 TOTAL EXPENSES $ 7.50 TOTAL $ 2,222.09 Task 2: Research Design, Historic Resources Survey, Survey Report LABOR Name Research Design Fieldwork Survey Report Admin Total Units Price Extension Principal Victor Palma 2.00 2.00 hrs $ 57.70 $ 115.40 Historical Architect Tom Eisenhour 4.00 1.00 5.00 hrs $ 40.10 $ 200.50 Historian 3 Kurt Korfmacher 24.00 12.00 24.00 60.00 hrs $ 28.87 $ 1,732.20 Administrative Assistant Nancy Quincy 2.00 2.00 hrs $ 28.37 $ 56.74 GIS Specialist Joel Butler 2.00 2.00 4.00 hrs $ 23.95 $ 95.80 Clerical Margo Gregory 1.50 1.50 hrs $ 13.49 $ 20.24 Subtotal Labor $ 2,220.88 Overhead (156.73%) $ 3,480.78 Profit (12%) $ 684.20 TOTAL LABOR $ 6,385.85 EXPENSES Research Design Fieldwork Survey Report Admin Total Units Price Extension Mileage 362 362 miles $ 0.555 $ 200.91 Copies, b/w 10 10 each $ 0.10 $ 1.00 Copies, color 10 10 each $ 1.00 $ 10.00 TOTAL EXPENSES $ 211.91 TOTAL $ 6,597.76 NOTES Mileage Austin-Pearland Pearland-Austin 181 181 362 Cost Breakdown Bailey Road TASK 1: Project Coordination Request/Archeological Background Report/Draft NEPA Text $ 2,222.09 2: Historic Resources Research Design, Reconnaissance Survey and Report $ 6,597.76 TOTAL $ 8,819.85 Texas Department of Transportation Environmental Assessment Bailey Road Widening Project Pearland, Brazoria County, Texas Terracon Proposal No. P92131480 Scope of Services U.S. Army Corps of Engineers Consultation I. Direct Labor Costs: CATEGORY HOURS RATE/HR. AMOUNT Project Scientist (Project Manager) 9.4 $110.00 1,034 Principal/Senior Project Manager 1.0 $150.00 150 SUBTOTAL $1,184 II. Direct Project Expense: CATEGORY UNITS UNIT RATE AMOUNT Freedom of Information Act Request 1 $15 $15 SUBTOTAL $15 TxDOT Environmental Assessment Documentation Preparation Assistance Wetlands and Waters of the U.S. Section Preparation I. Direct Labor Costs CATEGORY HOURS RATE/HR. AMOUNT Project Scientist (Project Manager) 15.0 $110.00 1,650 Principal/Senior Project Manager 2.0 $150.00 300 SUBTOTAL $1,950 Archeological Resources Section Preparation CATEGORY HOURS RATE/HR. AMOUNT Project Scientist (Project Manager) 15.0 $110.00 1,650 Principal/Senior Project Manager 2.0 $150.00 300 SUBTOTAL $1,950 TOTAL AMOUNT $5,099 P92131460 Fee Breakdown xls Bailey Road City of Pearland Additional Services - Scope Revision Clark Condon Associates 7/15/2013 1 oft Senior PM Task Manager Sr Engr CADD Admin/ Clerical Hours Sheets MH/Sheet Labor Cost Expenses Total $1 $115 $1 $65 $1 Meetings and Project Management 0 5 0 15 0 20 6 $1,550 $100 $1,650 Meetings, 2@ hours each 0 0 0 0 0 0 0 0 $0 $0 Review Revised Base for Conflicts 0 3 0 5 0 8 3 3 $613 $613 Review Design Criteria and Final Report 0 3 0 10 0 13 3 4 $938 $938 Monthly Progress Reports and Invoice () 0 0 0 0 0 0 0 0 $0 $0 Expenses - Mileage and Copies 0 0 0 0 0 0 0 0 $0 $100 $100 GRAND TOTAL 20 6 $1,550 $100 $1,650 7/15/2013 1 oft