Loading...
R-2013-174 2013-10-28RESOLUTION NO. R2013-174 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, RENEWING A BID FOR STREET AND SIDEWALK MAINTENANCE SERVICES. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City previously opened bids for street and sidewalk maintenance services, and such bids were reviewed, tabulated, and awarded. Section 2. That the City Council hereby renews the bid with Brooks Concrete Inc., in the unit cost amounts reflected on Exhibit "A" attached hereto. Section 3. The City Manager or his designee is hereby authorized to execute a contract for street and sidewalk maintenance services. PASSED, APPROVED and ADOPTED this the 28th day of October, A.D., 2013. ATTEST: >ili d6G L �i •, F�1�G' T ISE•'ETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR 464 t.yst1Ntt.N``"�' Resolution No. R2013-174 Exhibit "A" Brooks Concrete - Price Increase Schedule for Final Renewal of Bid #0811-41 Work Item Description Expiring Contract Price Proposed Contract Price Percentage Increase Required Performance Bonds and Insurance $6,885.00 $7,043.36 2.3% Filter Fabric Fence, Maintain, Removal, Complete - in -Place $2.02 $2.07 2.3% Inlet Protection, All Types, Maintain, Removal, Complete -in -Place $1.01 $1.03 2.3% Tree & Plant Protection Fencing, Maintain, Removal, Complete -in -Place $1.01 $1.03 2.3% Tree Root Barrier, Complete -in -Place, per Detail $5.82 $5.95 2.3% Trench Safety System (0' - 10' Depth), Complete - in -Place $25.31 $25.89 2.3% Site Preparation, Clearing & Grubbing, Complete -in. Place $4.05 $4.14 2.3% Remove and Dispose of Existing Concrete Pavement (up to 8" in depth). Price to include required sawcutting of existing pavement, Complete -in -Place $9.11 $9.32 2.3% Remove and Dispose of Existing Asphalt Pavement and Base, All Depths. Price to include required sawcutting of existing pavement, Complete -in - Place $9.11 $9.32 2.3% Remove and Dispose of Concrete Curb, All Depths and Types, Complete -in -Place $1.26 $1.29 2.3% Remove and Dispose of Concrete Sidewalk, All Widths and Depths. Price to include required sawcutting of existing pavement, Complete -in - Place $6.83 $6.99 2.3% Remove and Dispose of all Concrete or Gravel, Asphalt Driveways, All Depths, Includes Sawcutting $6.83 $6.99 2.3% Remove and Dispose of Existing Pipe Culverts and Storm Sewer (18" and smaller in size), Includes Backfill and Trench $8.10 $8.29 2.3% Remove and Dispose of Existing Pipe Culverts and Storm Sewer (greater than 18" diameter and less than 36" diameter in size), Including Backfill of Trench $10.12 $10.35 2.3% Remove and Dispose of Existing Pipe Culverts and Storm Sewer (36" diameter and larger in size), Including Backfill of Trench $15.18 $15.53 2.3% Hydrated Lime Slurry for Stabilized Subgrade, Complete -in -Place $303.75 $310.74 2.3% Work Item Description Expiring Contract Price Proposed Contract Price Percentage Increase Install 8" Thick Hydrated Lime Slurry Stabilized Subgrade, Compacted to 95%, Includes Excavation, Complete -in -Place $4.55 $4.65 2.3% Precast Storm Manhole 8'-0" Depth, Complete -in - Place $3,645.00 $3,728.84 2.3% Precast Storm Manhole, Additional Depth, Complete -in -Place $278.43 $284.83 2.3% 4" Yellow White Pavement Markings, Complete -in - Place $1.77 $1.81 2.3% Replace Storm, Manhole Ring and Cover, Adjust to Grade, Complete -in -Place $582.18 $595.57 2.3% 18" HDPE Storm Sewer, All Depths, Complete -in - Place $35.43 $36.25 2.3% 24" HDPE Storm Sewer, All Depths, Complete -in - Place $40.50 $41.43 2.3% 36" HDPE Storm Sewer, All Depths, Complete -in - Place $45.56 $46.61 2.3% Storm Curb Inlets, All Types, Remove and Replace, Complete -in -Place $708.75 $725.05 2.3% Adjust Manholes, All Types, To Grade, Complete -in - Place $202.50 $207.16 2.3% Adjust Inlets, All Types, To Grade, Complete -in - Place $202.50 $207.16 2.3% Adjust Valve Boxes, Meter Boxes, Electrical Boxes, To Grade, Complete -in -Place $1.01 $1.03 2.3% Asphaltic Concrete Surface Course for All Pavement, All Depths, Complete -in -Place $20.25 $20.72 2.3% Base Course for All Pavement, All Depths, Includes Excavation, Complete -in -Place $14.17 $14.50 2.3% Replace 8" Concrete Pavement, Complete -in -Place $49.38 $50.52 2.3% Replace 6" Concrete Driveways with Subgrade, Complete -in -Place $41.18 $42.13 2.3% 4" Reinforced Concrete Sidewalk, with #3 Rebar, Including Excavation and Subgrade, Complete -in - Place $35.72 $36.54 2.3% Curb Ramp, with #3 Rebar, Including Detectable Warning Surface, Complete -in -Place $455.62 $466.10 2.3% Concrete Curb (0" to 8" Height), Complete -in -Place $5.26 $5.38 2.3% Topsoil, Complete -in -Place $20.25 $20.72 2.3% Hydromulch Seeding, Complete -in -Place $1,518.75 $1,553.68 2.3% Work Item Description Expiring Contract Price Proposed Contract Price Percentage Increase Sodding, Bermuda or Augustine, as Required, Complete -in -Place $6.83 $6.99 2.3% Extra 5,000 PSI Reinforced Concrete, Where Required and Pre -Approved by the City, Complete - in -Place $151.87 $155.36 2.3%