Loading...
R-2013-092-2013-06-10RESOLUTION NO. R2013-92 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE OLD ALVIN WATERLINE PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with the Old Alvin Water Line Project, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to SER Construction Partners, LLC, in the amount of $3,398,483.00, and appropriates all additional funds necessary for construction of the Project . Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the Old Alvin Water Line Project. PASSED, APPROVED and ADOPTED this the 10th day of June, A.D., 2013. TOM REID MAYOR ATTEST: /.l!. /I% Y• i` G Lei Cl17 SE ETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Project Manual for: Old Alvin Road Water Line from John Lizer Road to McHard Road Resolution No. R2013-92 Exhibit "A" Bid No.: 0413-50 May 2013 Prepared By: 4.. _ s t -. %\ * 4 i LEON E. HOCH i et it82670 i jo. E0. c $' 1xFS• LS/'CENS.... • ENS'\_ C',71 o -t ,. ,--&-4/,,//, CHARLES D. GOODEN CONSULTING ENGINEERS, INC. TBPE Firm No. 4176 2320 Holmes Road, Suite A Houston, TX 77051 Phone (713) 660-6905 1 Fax (713) 660-8817 OLD ALVIN ROAD WATER LINE FROM JOHN LIZER ROAD TO MCHARD ROAD CITY OF PEARLAND BRAZORIA COUNTY,TEXAS TABLE OF CONTENTS SECTION TITLE NO. OF PAGES DIVISION 0—BIDDING AND CONTRACT DOCUMENTS 00100 Invitation to Bid 3 00200 Instructions to Bidders 7 00300 Bid Proposal 3 00300A Bid Proposal Exhibit"A" 4 00500 Standard Form of Agreement 7 00610 Performance Bond 2 00611 Payment Bond 2 00612 One-Year Maintenance Bond 2 00615 Partial Waiver of Lien and Payment Affidavit 1 00700 General Conditions of Agreement 36 00800 Special Conditions of Agreement 2 00811 Wage Scale for Engineering Construction 1 00900 Form of Addendum 1 DIVISION 1—GENERAL REQUIREMENTS 01100 Summary of Work 1 01140* Contractor's Use of Premises 4 01200* Measurement and Payment Procedures 3 01290* Change Order Procedures 4 01310*. Coordination and Meetings 3 01350* Submittals 6 01380* Construction Photographs 3 01420* Referenced Standards 5 01430* Contractor's Quality Control 2 01440* Inspection Services 1 01450* Testing Laboratory Services 2 01500 Temporary Facilities and Controls 9 01505 Mobilization 1 01550* Stabilized Construction Exit 4 01555* Traffic Control and Regulation 4 01560* Filter Fabric Fence 3 01561* Reinforced Filter Fabric Bather 3 01562* Waste Material Disposal 3 01563* Tree and Plant Protection 4 01564* Control of Ground Water and Surface Water 8 01565 TPDES Requirements 3 00010- 1 of 4 CITY OFPEARLAND TABLE OF CONTENTS SECTION TITLE NO. OF PAGES 01566* Source Controls for Erosion and Sedimentation 5 01570* Trench Safety System 4 01580* Project Identification Signs 4 01600* Material and Equipment 3 01630* Product Options and Substitutions 3 01720* Field Surveying 2 01750* Starting Systems 2 01760* Project Record Documents 2 01770* Contract Closeout 2 DIVISION 2—SITE WORK 02105 Sampling and Analysis in Potentially Petroleum Contaminated Areas 8 02200* Site Preparation 4 02220S Site Demolition 1 02220* Site Demolition 5 02252* Cement Stabilized Sand 3 02255* Bedding, Backfill,and Embankment Materials 6 02316* Excavation and Backfill for Roadways 4 02317* Excavation and Backfill for Structures 7 02318* Excavation and Backfill for Utilities 12 02330* Embankment 5 02335* Subgrade 7 02370* Geotextile 2 02371* RipRap 4 02415* Augering Pipe or Casing for Sewers 7 02417* Augering Pipe or Casing for Water Lines 6 02510* Water Mains 10 02510S Water Mains 1 02511* Water Meters 2 02512* Polyethylene Wrap 4 02514* Fire Hydrant Assembly 6 02515 Water Tap and Service Line Installation 6 REST OF PAGE INTENTIONALLY LEFT BLANK 00010-2of4 CITY OF PEARLAND TABLE OF CONTENTS SECTION TITLE NO. OF PAGES 02520* Valve Boxes,Meter Boxes, and Meter Vaults 4 02530* Gravity Sanitary Sewers 20 02531* Sanitary Sewer Service Leads or Reconnections 6 02532* High Density Polyethylene(HDPE) Solid Wall Pipe 4 02533* Sanitary Sewage Force Mains 5 02534 PVC Pipe 6 02540* Tapping Sleeves and Valves 3 02541* Water and Wastewater Line Valves 8 02542* Concrete Manholes and Accessories 10 02582* Thermoplastic Pavement Markings 2 02603* Frames, Grates,Rings,and Covers 3 02624* Structural Plate Culvert Structures 7 02630* Storm Sewers 10 02633* Adjusting Manholes,Inlets, and Valve Boxes 3 02634S Ductile Iron Pipe and Fittings 1 02634* Ductile Iron Pipe and Fittings 5 02635* Steel Pipe and Fittings 10 02636* Polyurethane Coating on Steel or Ductile Iron Pipe 6 02710* Base Course for Pavement 12 02741* Asphaltic Concrete Pavement 7 02742* Prime Coat 4 02743* Tack Coat 3 02744* Single Course Surface Treatment 4 02751* Concrete Pavement 15 02762* Temporary and Removable Reflectorized Pavement Marking 4 02770* Curb, Curb &Gutter, and Headers 4 02811* Landscape Irrigation 5 02820* Wood Fences and Gates 3 02821* Chain Link Fences and Gates 4 02910* Topsoil 3 02921* Hydromulch Seeding 4 02922* Sodding 4 02931* Landscape and Tree Planting 15 02980* Pavement Repair and Resurfacing 3 02981* Blast Cleaning of Pavement 2 REST OF PAGE INTENTIONALLY LEFT BLANK 00010-3 of 4 CITY OF PEARLAND TABLE OF CONTENTS SECTION TITLE NO. OF PAG ES DIVISION 13—Computer Equipment 13730 Computer Equipment 5 REFERENCED TXDOT SPECIFICATIONS 416^ Drilled Shaft Foundations 420^ Concrete Structures • 421^ Hydraulic Cement Concrete 422^ Reinforced Concrete Slab 424^ Precast Concrete Structures (Fabrication) 425^ Precast Prestressed Concrete 426^ Prestressing 429^ Concrete Structure Repair 434^ Elastometric Bridge Bearing 440^ Reinforcing Steel REPORTS INCLUDED BY ATTACHMENT 1. Geotechnical Report by HVJ Associates, Inc.Titled "Geotechnical Investigation Old Alvin Road Water Line Replacement From McHard Road to John Lizer Road,Pearland, Texas"—Report No. HG 1019721,Dated May 7, 2013. ("n\ 2. Phase I Environmental Site Assessment by HVJ Associates,Inc.Titled "Phase I Environmental Site Assessment Old Alvin Road Waterline Project John Lizer Road to McHard Road No. WA1101,Pearland,Brazoria County, Texas"— Report No. HE1019720,Dated August 2011 3. Phase II Environmental Site Assessment by HVJ Associates, Inc. Titled "Phase II Environmental Site Assessment Old Alvin Road Waterline Project John Lizer Road to McHard Road No. WA1101,Pearland,Brazoria County, Texas"— Report No. HE1019720,Dated October 12, 2011 Section numbers followed by an asterisk(*)are included by reference and are available on the City of Pearland's Engineering Department Website. Section numbers followed by an `S' are special provisions to a Standard City of Pearland Specification. Special provisions appear in this project manual. Section numbers followed by a `^' are Specifications included by reference from the Texas Department of Transportation"Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges"dated June 1,2004. END OF SECTION 00010-4 of 4 CITY OF PEARLAND INVITATION TO BID Section 00100 INVITATION TO BID CITY OF PEARLAND,TEXAS Lowest Responsible Bidder Sealed Electronic Bids will be accepted for the following project, in the City's E-bid System. Electronic bids shall be submitted through the City's web site at: www.cityofpearland.ora/bids. All interested Bidders are required to register as a "supplier" on the City's E-bid System at the above web address and clicking on "Supplier Registration". Registration provides automatic access to any changes to the Plans, Specifications or Bid time and date. However, submission of an E-bid requires completing a short registration questionnaire found on this web site. For more information regarding registration instructions, see INSTRUCTIONS TO BIDDERS, Section 00200, included in the project bid documents viewable on the web site. Questions regarding electronic bidding should be directed to City Purchasing Officer at ebids(aci.pear(and.tx.us. All Bids submitted electronically will remain confidential until the opening date and time when they will be opened and read into the public record. Bids, shall be submitted on the form provided in the E-bid System and submitted electronically through this system to the City Purchasing Officer, City of Pearland, City Hall located at 3519 Liberty Drive, Pearland, Texas 77581. Electronic bids will be accepted until 2:00 p.m., Thursday, May 30, 2013. All Bids shall reference the following project information in the nappropriate locations in provided electronic format. All properly submitted bids shall be publicly "opened" and read aloud into the public record following the closing of the acceptance period for the construction of: Old Alvin Road Water Line from John Lizer Rd.to McHard Rd. City of Pearland,Texas COP PN: WA1101 BID NO.: 0413-50 A mandatory pre-bid conference will be held at the City of Pearland City Hall at 3519 Liberty Drive,Pearland, Texas 77581 at 9:00 a.m. on May 16, 2013. The project will entail the construction of a 20" diameter water line with all associated appurtenances including valves, service line connections, and fire hydrants. Tree protection and pavement removal and replacement are also included. Additionally, there will be storm sewer removal and replacement from Linwood Street to Town Ditch. Control of surface and ground water; preparation and implementation of a traffic control plan and storm water pollution prevention plan, and all associated construction related permits are included in the scope. C 10-2012 00100- 1 of 3 CITY OF PEARLAND INVITATION TO BID Upon award of a contract, the successful Bidder will be required to utilize the City's web based project management software, "Pro-Trak" for the administration of the construction project, including but not limited to, all transmittals and material submittals, RFI's, RFC's, Change Orders, Applications for Payment and all project communications with the City, its Construction Manager and Engineer. This system has certain hardware, internet access and operation requirements that form the basis for all project communications, documentation and records for the project. For more information, see INSTRUCTIONS TO BIDDERS, Section 00200. Electronic Bid Documents: including Contract Documents, Plans and Technical Specifications are available for download on the City's Website at: www.citvofpearland.or2/bids upon registration. The documents are NOT viewable without registration. These same documents are also available at the following locations. City'of Pearland, City Hall (281) 652-1600 Purchasing Department 3519 Liberty Drive Pearland, Texas 77581 Amtek Plan Room (713) 956-0100 4001 Sherwood Houston, TX 77092 The Associated General Contractors of America, Inc. (713) 334-7100 2400 Augusta, Suite 350 Houston, TX 77057 Virtual Builders Exchange (832) 613-0201 7035 W. Tidwell Building J, Suite 112 Houston, TX 77092 McGrawHill Construction—Dodge Reports 1-800-393-6343 No plan fees or deposits are required for plans and bid documents obtained through the City's E- bid System. BIDDERS MUST .REGISTER AS A SUPPLIER ON THE CITY'S E-BID SYSTEM IN ORDER TO SUBMIT A BID EVEN IF BID DOCUMENTS ARE OBTAINED VIA ONE OF THE PLAN HOUSES. Bidders accept sole responsibility for downloading all of the required documents, plans, specifications bid forms and addenda required for bidding. No bid may be withdrawn or terminated for a period of ninety (90) days subsequent to the bid opening date without the consent of the City of Pearland. Unless otherwise expressly provided herein, all references to "day(s)"shall mean calendar day(s). 10-2012 00100-2 of 3 CITY OF PEARLAND INVITATION TO BID Bid Security and Bonds: Bid Security in the form of Cashier's Check, Certified Check, or Bid Bond payable to the City of Pearland in the amount of 5% of the total base bid price must accompany each proposal. Bidders submitting bids electronically through the E-bid System shall scan and up-load a copy of the sealed Bid Bond as an attachment to their bid. Original documents for Bid Security shall be requested by the City from the lowest two bidders and delivered to the City's Purchasing Officer within 48 business hours of the Bid Opening. Bid Security shall be delivered to: Office of City Purchasing, Finance Department, 2nd Floor City Hall, 3519 Liberty Drive, Pearland,Texas 77581. The successful Bidder must furnish Performance and Payment Bonds as required by Chapter 2253 of the Texas Government Code or other applicable law, as amended, upon the form included in the Contract Documents, in the amount of one hundred percent (100%) of the contract price, such bonds to be executed by a corporate surety duly authorized to do business in the State of Texas, and named in the current list of"Treasury Department Circular No. 570", naming the City of Pearland, Texas as Obligee. Additionally, the successful bidder shall be required to provide a one year Maintenance Bond for the improvements installed as part of this work, as provided in the Special Conditions of Agreement. Equal Opportunity: All responsible bidders will receive consideration for award of contract without regard to race, color, religion, sex, or national origin. Selection Criteria: The Contract is to be awarded on the basis of Lowest Responsible Bidder. In identifying this criteria the City will consider: 1) lowest total bid price for all work listed and specifically requested, including but not limited to: Base Bid, Extra Work items and selected Alternates. The City of Pearland reserves the right to award a contract based on any combination of the above considered to be in its best interests or to reject any or all bids. A bid that has been "opened" may not be changed for the purposes of correcting an error in the bid price. Young Lorfing, TRMS City Secretary, City of Pearland First Publication date May 8, 2013 Second Publication date May 15, 2013 C 10-2012 00100-3 of 3 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS Section 00200 INSTRUCTIONS TO BIDDERS 1. Defined Terms 1.1 The term "Owner" hereinafter is defined as the City of Pearland and is used interchangeably with the term"the City". Both terms are synonymous and refer to the City. 1.2 The term "Bidder" means one who submits a Bid Proposal directly to Owner, as distinct from a sub-bidder, who submits a bid to a Bidder. The term "Successful Bidder" means the lowest responsible Bidder to whom the Owner (on the basis of Owner's evaluation as hereinafter provided) makes an award. The term "Bid Documents" includes the Invitation to Bidders, Instructions to Bidders, the Bid Proposal, and the proposed Contract Documents (including all Addenda issued prior to receipts of bids). 1.3 The term"E-bid System"refers to the City's electronic bidding system. This is a web- based system that provides all Bid Documents electronically to potential Bidders and forms the pathway for interested Bidders to submit bids in response to advertisement and invitation. The term "e-bid" and/ or"electronic bid" means the Bidders' electronic response submitted on the electronic Bid Proposal to the Owner by way of the E-bid System. The terms "electronic bid" or"e-bid" are used inter-changeably to describe the above bid process to submit an authorized bid to the City in response to an Invitation to Bidders. 7\, 1.4 The term "Pro-Trak" means the City's web-based contract administration and construction records management system used by involved parties to administer the project. This system serves as the web accessed centralized information distribution hub for communications and document management, pay application processing and record retention for all project documentation. Operational instructions for this system will be issued to the successful Bidder at the pre-Construction Meeting. 1.5 All other definitions set out in the Contract Documents are applicable to terms used in the Bidding Documents. 1.6 Unless otherwise expressly provided herein, all references to "day(s)" shall mean consecutive calendar day(s). 2. Registration for E-bid System 2.1 The Owner's E-bid System is accessible via the City's web site at www.cityofpearland.org/bids. Bid documents can be viewed by simply selecting a specific project from the BID OPPORTUNITIES list and clicking on that project AFTER registration as a Supplier. Potential Bidders MUST REGISTER as a "Supplier" by clicking on the Supplier Registration button and completing the registration form. Registrants must provide data for all categories marked with a"*"and must select the following project bid categories: Building Construction Services,New(includes Maintenance and Repair) Construction Services, General 10-2012 00200-1 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS Construction Services,Heavy " " Construction Services,Trade (new construction) Select the appropriate Time Zone for the Bidder's location and whether that location observes Daylight Savings time. Complete the registration information providing all required contact information and establish password security for the E-bid System. Once complete, "suppliers" will receive emails notifying of bid opportunities. Downloading any project bid data will automatically place the bidder's contact information on the list of plan holders list and the E- bid System will automatically send any and all updates, changes or addenda associated with that project. 2.2 The electronic Bid Proposal can only be submitted through this system. The form can be printed for Bidder's use, but the Bid Proposal MUST be submitted on the electronic form within the E-bid System. 2.3 Questions regarding use of the E-bid System may be directed by email to: ebids@ci.pearland.tx.us. 3. Copies of Bidding Documents 3.1 Complete sets of "electronic" Bidding Documents are available for download to registered Bidders at No Cost from the City's E-bid System at: www.cityofpearland.org/bids. Interested Bidders must register as a "Supplier" on this site in order to receive the Bid Documents, and all Addenda or other notifications of changes, including communications from the Owner or Engineer. All Bid Documents are available to download and print. CP.\ 3.2 The Bidder accepts sole responsibility for ensuring that he obtains a full set of these documents by completing the registration and executing a full and complete download of the project documents. Downloading of Bid Documents automatically ensures receipt of any and all subsequent communications from the City or its Engineer. 3.2 Copies of Bidding Documents are available or may be viewed at any of the Plan Houses listed in the Invitation to Bidders. It is recommended that all interested Bidders, whether bidding directly to the Owner or Sub-bidders bidding to a Bidder, register as a Supplier and download the project Bid Documents. 3.3 Complete sets of Bidding Documents must be used in preparing Bid Proposals; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents including, but not limited to all. Addenda issued prior to bid. 3.4 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bid Proposals on the Work, and do not confer a license or grant for any other use. 4. Qualifications of Bidders 4.1 In determining to whom to award a contract, the City of Pearland may consider, in addition to the other selection criteria identified in section 16 of these Instructions to Bidders, the following Qualifications of Bidder, and each Bidder must be prepared to submit within two (2) days of Owner's request any or all of such Qualifications requested: 10-2012 00200-2 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS (1.-\ 1) A brief narrative of previous experience of the Bidder with projects of a similar nature and scope; 2) A list, including owner name and project location, of on-going projects and contracts for construction of projects of the Bidder which are not yet substantially complete; 3)A list of proposed subcontractors and suppliers for the project being bid; 4) A list of name, address and telephone number of references for projects completed by Bidder; and 5) A Financial Statement of Bidder, consisting of the balance sheet and annual income statement of Bidder for the Bidder's last fiscal year end preceding the submission of the Bid Proposal, which has been audited or examined by an independent certified public accountant. The Financial Statement of Bidder shall be used to determine a Bidder's net working capital, which is defined as current assets less current liabilities. A Bidder's net working capital shall be considered evidence of the Bidder's ability to provide sufficient fmancial management of the project being bid. The Bidder's Financial Statement shall be clearly and conspicuously marked as "confidential", and shall be deemed and treated as confidential and excepted from the Public Information disclosure requirements of Texas Government Code Section 552.001 et seq., as such information, if released, would give advantage to a competitor or bidder, and/or would cause substantial competitive harm to Bidder. 5. Examination of Contract Documents and Site 5.1 It is the responsibility of each Bidder before submitting a Bid Proposal, to (a) examine the Bidding Documents thoroughly, (b) visit the site to become familiar with local conditions that may affect cost, progress, performance or furnishing of the Work, (c) consider federal, state and local laws and regulations that may affect cost, progress, performance or furnishing of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors, omissions or discrepancies in the Contract Documents, (f) to recognize and plan for use of the City's "Pro-Trak" software to administer the construction process and perform the work of the project. 5.2 Any reports of explorations and tests of conditions at the site which have been utilized by the Engineer in preparation of the Contract Documents will be made available to Bidders for review, but such reports are not part of the Contract Documents. Bidder may not and should not rely upon the accuracy of the data contained in such reports, interpretations or opinions contained therein, or the completeness thereof, for the purposes of bidding or construction. 5.3 Information and data reflected in the Contract Documents with respect to underground utilities, equipment or other underground facilities at or contiguous to the site is based upon information and data furnished to Owner and Engineer by owners of such underground facilities or others, and Owner does not assume responsibility for the accuracy or completeness thereof. 5.4 Before submitting a Bid Proposal, each Bidder will, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and underground facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work and which Bidder deems 10-2012 00200-3 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS necessary to determine its Bid Proposal prices for performing and furnishing the Work in accordance with the Contract Time, Contract Price and other terms and conditions of the Contract Documents. 5.5 On request in advance, Owner will provide each prospective Bidder access to the site to conduct such explorations and tests as each prospective Bidder deems necessary for submission of a Bid Proposal. Prospective Bidders shall fill all holes, clean up and restore the site to its former condition upon completion of such explorations. 5.6 The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands, access thereto or contractual arrangements for use by the Contractor required for temporary construction facilities or storage of materials and equipment are to be provided by Contractor. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by Owner unless otherwise provided in the Contract Documents. 5.7 The submission of a Bid Proposal will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid Proposal is premised upon performing and furnishing all of the Work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in, required by or reasonably inferred from the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 6. Interpretations and Addenda 6.1 All questions about the meaning or intent of the Contract Documents are to be directed to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered or transmitted by electronic means to all registered Bidders in the City's E-bid System. Questions received less than five(5) days prior to the date for opening of Bid Proposals may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 6.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by Owner or Engineer. Addenda will automatically be made available to all registered Bidders that have downloaded Bid Documents from the City's E-bid System. 7. Bid Security 7.1 Each Bid Proposal must be accompanied by bid security made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid Proposal price, in the form of a certified check, cashier's check or a Bid Bond("Bid Security"). 7.2 Bidders submitting bids through the E-bid System shall scan and up-load a copy of their Bid Security (sealed Bid Bond, Certified Check or Cashier's Check ) as an attachment to their electronic bid. Original documents for Bid Security shall be requested by the City from the lowest two bidders and delivered to the City's Purchasing Officer within 48 10-2012 00200-4 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS C'n business hours of the Bid Opening. Bid Security shall be delivered to: Office of City Purchasing,Finance Department,2nd Floor City Hall, 3519 Liberty Drive,Pearland,Texas 77581. 7.3 The Bid Security of the Successful Bidder will be retained until such time as Bidder has executed the Standard Form of Agreement, and furnished the required Performance and Payment Bonds, whereupon the Bid Security of both bidders will be returned. If the Successful Bidder fails to execute and deliver the Standard Form of Agreement and furnish the required performance and payment bonds within ten (10) days after the Notice of Award, Owner may annul the Notice of Award and shall be entitled to make a claim against the Bid Security. The Bid Security of other Bidders will be retained until the Contract is awarded and the Standard Form of Agreement becomes effective, or all bids are rejected, whereupon Bid Security furnished by all such Bidders will be returned. 8. Contract Time 8.1 The number of days in which the Work is to be Substantially Completed, as set forth in the Bid Proposal form and the Standard Form of Agreement, subject to such extension of time as may be due under the terms and conditions of the Contract Documents ("Contract Time"). All references to"time"or"days" shall be interpreted as consecutive calendar days. 9. Liquidated Damages and Early Completion Bonus 9.1 Provisions for liquidated damages and early completion bonus, if any, are set forth in the Standard Form of Agreement. 10. Substitute or"Or-Equal" Items 10.1 The Contract, if awarded, will be on the basis of the selected materials and equipment described in the Plans or specified in the Specifications without consideration of possible substitute or "or-equal" items. Whenever it is indicated in the Plans or specified in the Specifications that a substitute or "or-equal" item of material or equipment may be furnished or used by the Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Agreement becomes effective. All "or-equal" references shall be interpreted to mean "or approved equal". The procedure for submission of any such application by Contractor and consideration by Engineer is set forth in the Contract Documents. 11. Bid Form 11.1 The Bid Proposal form (Section 00300 — Bid Proposal) is included with the Bidding Documents when downloaded. This Document must be printed and signed, as required below, and then uploaded as an Attachment to the Bid. All E-bids must be submitted on the City's official E-bid System Bid Proposal document. All blanks on the Bid Proposal form must be completed or filled in. The Bidder shall bid all Alternates,if any. Incomplete Bid Proposals may be cause for rejection. 11.2 Bid Proposals by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied be evidence of authority to sign) 10-2012 00200-5 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature. Once executed the document is to be uploaded as an attachment to the Bid. 11.3 Bid Proposals by partnerships must be executed in the partnership name and signed by a general partner, whose title must appear under the signature, and if a corporate general partner, executed as required above for corporations and the official address of the partnership must be shown below the signature. All names must be typed or printed below the signature. Once executed the document is to be uploaded as an attachment to the Bid. 11.4 The Bidder shall acknowledge receipt of all Addenda (the number of which must be filled in on the Bid Proposal form). 11.6 The address and telephone number for communications regarding the Bid Proposal must be shown on the Bid Proposal form. 12. Submission of Bid Proposals 12.1 The place, date and/or time designated for opening Bid Proposals may be changed in accordance with applicable laws, codes and ordinances. Any such changes to the Bid Schedule shall be made by Addenda. 12.2 Electronic Bids shall be submitted per the requirements, instructions, terms and conditions as stated in the registration and submittal instructions of the City's E-bid System electronic bidding software. All Bidders utilizing this system MUST register as a potential supplier, (Bidder). E-Bids are submitted directly via the City's Web based system located at www.cityofpearland.org/bids. Bid Proposals submitted after the bid date and time will be rejected. 13. Modification and Withdrawal of Bid Proposals 13.1 Prior to submission, E-bid Bid Proposals may be modified or withdrawn without prejudice. 13.2 Once submitted, Bid Proposals may only be modified by an appropriate document duly executed(in the manner that a Bid Proposal must be executed) and delivered to Office of City Purchasing, Finance Department, 2nd Floor City Hall, 3519 Liberty Drive, Pearland, Texas 77581 and submitted any time prior to the opening of Bid Proposals. 13.3 A Bidder may not modify or withdraw its Bid Proposal by facsimile or verbal means. A withdrawn Bid Proposal may be resubmitted prior to the designated time for opening Bid Proposals. No bid may be withdrawn or terminated for a period of sixty(60) days subsequent to the bid opening date without the consent of the City of Pearland. 13.4 If, within twenty-four (24) hours after Bid Proposals are opened, any Bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material mistake in the preparation of its Bid Proposal, that Bidder may request to withdraw its Bid Proposal and the bid security may be returned or, at the discretion of the Owner, Owner may make a claim against the bid security. Thereafter, that Bidder will be disqualified from further bidding on the Project to be provided under the (47 Contract Documents. 10-2012 00200-6 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS 14. Opening of Bid Proposals 14.1 Bid Proposals will be opened and (unless obviously non-responsive) read aloud publicly. An abstract of the amounts of the base Bid Proposals and major alternates (if any) will be made available to Bidders after the opening of Bid Proposals. Bid Proposals, in their entirety, shall be open for public inspection after the contract is awarded, with the exception of any trade secrets or confidential information contained therein, provided Bidder has expressly identified any specific information contained therein as being trade secrets or confidential information. 15. Bid Proposals to Remain Subject to Acceptance 15.1 All Bid Proposals will remain subject to acceptance for sixty (60) days after the day of the Bid Proposal opening, but Owner may, in its sole discretion, release any Bid Proposal and return the bid security prior to that date. 16. Award of Contract 16.1 Owner reserves the right to reject any and all Bid Proposals, to waive any and all informalities not involving price, time or changes in the Work and to negotiate contract terms with the Successful Bidder. Owner may reject a bid as non-responsive if: 1) Bidder fails to provide required Bid Security; 2) Bidder improperly or illegibly completes or fails to complete all information required by the Bidding Documents; 3) Bidder fails to sign the Bid Proposal or improperly signs the Bid Proposal; 4) Bidder qualifies its Bid Proposal; 5) Bidder tardily or otherwise improperly submits its Bid Proposal; 6) Bidder fails to submit the Qualifications of Bidder as required under section 3 of these Instructions to Bidders; or 7) Bid Proposal is otherwise non-responsive. Contracts are awarded on the basis of one of the following criteria: A)provision of the"Best Value'or B) Lowest Responsible Bidder 16.2 Best Value. In determining the best value for the Owner, and in determining to whom to award a contract, Owner may consider: 1) purchase price; 2) reputation of the Bidder and Bidder's goods or services; 3) quality of Bidder's goods or services; 4) extent to which the goods or services meet the Owner's needs; 5) Bidder's past relationship with the Owner; 6) impact on the ability of Owner to comply with laws and rules relating to contracting with historically underutilized businesses and nonprofit organizations employing persons with disabilities; 7) total long-term cost to Owner to acquire Bidder's goods or services; 8) the Qualifications of Bidder; and 9) any other relevant criteria specifically listed in the Bidding Documents. A contract to be awarded to the Bidder offering the Best Value may be let on either a lump sum basis or a unit cost basis dependent on the Bid Proposal format. 16.3 Lowest Responsible Bidder. In determining Lowest Responsible Bidder, Owner will consider: Lowest Total Bid price for all work including Base Bid, Extra Work and Alternates, if any, and any other cost criteria. Additional evaluation criteria may include: the Qualifications of the Bidders, whether or not the Bid Proposals comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Proposal form or prior to the Notice of Award. Discrepancies in the multiplication of units of 10-2012 00200-7of8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. A contract to be awarded to the Lowest Responsible Bidder may be let on either a lump sum basis or a unit cost basis dependent on the Bid Proposal format. Acceptance of any and all bids may be conditioned on compliance with the requirement for attendance of the mandatory pre-bid meeting. 16.4 In either case, Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid Proposal and to establish the responsibility, qualifications and financial ability of Bidders, proposed Subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents, to Owner's satisfaction,within the Contract Time. 17. Contract Security 17.1 When the Successful Bidder delivers the executed Standard Form of Agreement to Owner, it must be accompanied by the Performance, Payment, Maintenance and Surface Correction Bonds required by the Contract Documents. Bonds may be on the forms provided herein or an equal form containing no substantive changes,as determined by Owner. 18. Signing of Agreement 18.1 When Owner gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Standard Form of Agreement, and the required Performance and Payment Bond forms. Within ten (10) days thereafter Contractor shall sign and deliver the required number of counterparts of the Standard Form of Agreement to Owner with the required Bonds. Within ten (10) days thereafter, Owner shall deliver one fully signed counterpart to Contractor. There shall be no contract or agreement between Owner and the Successful Bidder until proper execution and attestation of the Standard Form of Agreement by authorized representatives of the Owner. 19. Pre-bid Conference 19.1 A pre-bid conference will be held as indicated in the Invitation to Bid. Attendance at the pre-bid conference is MANDATORY to fulfill the prerequisite requirements for Bidders bidding directly to the Owner. 20. Retainage 20.1 Provisions concerning retainage are set forth in the Contract Documents. (1'N, END OF SECTION 10-2012 00200-8 of 8 CITY OF PEARLAND BID PROPOSAL Section 00300 BID PROPOSAL Part A Date: May 30th,2013 Bid of SER Construction Partners,LLC. ,an individual proprietorship/a corporation organized and existing under the laws of the State of Texas/a partnership consisting of ,for the construction of: Old Alvin Road Water Line from John Lizer Road to McHard Road. City,of Pearland,Texas COP PN:WA1101 BID NO.: 0413-50 (Submitted in Electronic format) To: The Honorable Mayor and City Council of Pearland • City of Pearland 3519 Liberty Drive Pearland,Texas 77581 Pursuant to the published Invitation to Bidders, and Instructions to Bidders, the undersigned Bidder hereby proposes to perform all the work and furnish all necessary superintendence, labor, machinery, equipment, tools and materials, and whatever else may be necessary to complete all the work described in or reasonably inferable from the Contract Documents for the construction of the Old Alvin Road Water Line from John Lizer Road to McHard Road. with all related appurtenances, complete, tested, and operational, in accordance with the Plans and Specifications prepared by the Engineer, Charles D. Gooden Consulting Engineers (TBPE # F-4176), 2320 Holmes Road, Suite A, Houston, TX 77051, Engineer-of-Record: Leon E. Hoch, P.E., for the unit prices or applicable prices set forth in Exhibit "A", the electronic bid form as contained in the City's E-bid system, which, once fully executed and submitted shall constitute a legal and executable proposal from the Bidder. It is understood that, in the event any changes are ordered on any part of the Work, the applicable unit prices bid shall apply as additions to or deductions from the total prices for the parts of the Work so changed. • The Bid Security required under the Instructions to Bidders is included and has been uploaded as an attachment within the E-bid system and, that a fully executed, signed and sealed hard copy has been delivered to the Office of City Purchasing, Finance Department, 2nd Floor, City Hall, 3519 Liberty Drive, Pearland,Texas 77581. The Bidder agrees to submit to the Owner the Qualifications of Bidder, including the Financial Statement of Bidder, as required by the Instructions to Bidders if requested to do so as a condition of the Bid review. The Bidder binds himself, upon acceptance of his proposal, to execute the Standard Form of Agreement and furnish an acceptable Performance and Payment Bond and Maintenance Bond, each in the amount of one hundred percent (100%) of the total Contract Price, according to the forms included in the Contract Documents, for performing and completing the said work within Bidder's Initial's: 10-2012 00300- 1 of 3 CITY OF PEARLAND BID PROPOSAL the time stated and for the prices stated in Part B of this proposal along with all required insurance in the required amounts. The undersigned Bidder agrees to commence work within 10 days of the date of a written Notice to Proceed. It is understood that the Work is to be Substantially Complete within ninety(90) days after the date of the Notice to Proceed. Time for Substantial Completion shall begin on the date established by the Notice to Proceed. The Contractor will pay liquidated damages in the amount(s) specified in Document 00500— Standard Form of Agreement, in the event the Work is not Substantially Complete within the Contract Time. The undersigned agrees that the amounts bid in this Bid Proposal will not be withdrawn or modified for ninety (90) days following date of Bid Proposal opening, or such longer period as may be agreed to in writing by the City of Pearland and Bidder. It is understood that in the event the Successful Bidder fails to enter into the Standard Form of Agreement and/or to furnish an acceptable Performance and Payment Bond and Maintenance Bond, each in the amount of one hundred (100) percent of the Contract Price, along with all required insurance in the stated amounts within ten (10) days of the Notice of Award, the Successful Bidder will forfeit the Bid Security as provided in the Instructions to Bidders. Unless otherwise expressly provided herein,all references to "day(s)"shall mean calendar day(s). The Bidder acknowledges that the following Addenda have been received. The modifications to the Bidding Documents noted therein have been considered and all costs thereto are included in the Bid Proposal prices. Addendum No.: 1 Date: 5/13/2013 Addendum No.: Date: Addendum No.: 2 Date: 5/28/2013 Addendum No.: Date: Bidder hereby represents that the only person or parties interested in this offer as principals are those named. Bidder has not directly or indirectly entered into any agreement, participated in any collusion,or otherwise taken any action in restraint of free competitive bidding. Firm Name: SER Construction Partners,LLC. By: Rosbel E.Ramos Title: President Address: 3636 Pasadena Blvd.,Pasadena,Texas 77503 Phone No: 713-473-7900 ATTEST: , .el ;.Ra os (Seal,if Bidder is a Corporation) (Typ•d or 'rinte 1 f rif Si: .ture Date: Ma 30th, 2l n� !` Bidder's Initial's:�- 10-2012 00300-2 of 3 CITY OF PEARLAND BID PROPOSAL END OF SECTION Bidder's Initial's: 10-2012 00300-3 of 3 • City of Pearland Texas (Projects Department) Supplier Response Bid Information Contact Information Ship to Information Bid Creator Patty Patke Program Address 3519 Liberty Drive Address 3519 Liberty Drive Specialist Suite 201 Email ppatke@ci.pearland.tx.us Pearland,TX 77581 Pearland,TX 77581 Phone (281)652-1756 Contact Patty Patke Contact Fax (281)652-1706 Projects Department Department Bid Number 0413-50 Addendum 2 Building City Hall Building City Hall Title Old Alvin Water Line from 2nd Floor John Lizer Rd.to McHard Rd. Floor/Room Floor/Room Bid Type Invitation to Bid Telephone (281)652-1756 Telephone 281 (652) 1738 Issue Date 05/09/2013 Fax (281)652-1706 Fax Close Date 5/30/2013 2:00:00 PM CT Email Email ebids@ci.pearland.tx.us Need by Date ppatke@ci.pearland.tx.us Supplier Information Company SER Construction Partners, LLC Address 3636 Pasadena Blvd Pasadena,TX 77503 Contact Department Building Floor/Room ("Telephone 1 (713)473 7900 Fax 1 (713)473 7919 Email Submitted 5/30/2013 12:44:34 PM CT Total $3,398,483.00 Signature Supplier Notes Bid Notes The project will entail the construction of a 20"diameter water line with all associated appurtenances including valves, service line connections, and fire hydrants. Tree protection and pavement removal and replacement are also included. Additionally,there will be storm sewer removal and replacement from Linwood Street to Town Ditch.Control of surface and ground water; preparation and implementation of a traffic control plan and storm water pollution prevention plan,and all associated construction related permits are included in the scope. Bid Activities Date Name Description 5123/2013 2:00:00 PM Mandatory Pre-Bid Meeting A mandatory pre-bid conference will be held at the City of Pearland City Hall at 3519 Liberty Drive,Pearland,Texas 77581 at 2:00 p.m.on May,23,2013. 0413-50 Addendum 2-Page 1 of 17 • Bid Messages - Date Subject Message 05/15/13 Mandatory Pre-Bid Meeting Please see Addendum 1 for date and time of Mandatory Pre-Bid Meeting 05/17/13 Mandatory Pre-Bid Meeting Due to conflicting information regarding the date and time of the Mandatory Pre-Bid meeting for Old Alvin Rd Waterline,the City of Pearland will hold a second Mandatory Pre-Bid meeting on May 23rd,at 2:00pm, as was specified in the original Invitation to Bidders. Bidders who intend to submit a bid for this project and did not attend the May 16th meeting,are required to attend on May 23rd. Please contact the City if you have any questions. Please review the following and respond where necessary # Name Note Response 1 Response Attachment Bidder understands and has completed the following:The Submitted Bid Proposal and Bid Security required under the Instructions to Bidders has been uploaded as an attachment within the E-bid system and,a fully executed, signed and sealed hard copy of the Bid Bond will be delivered upon request to the Office of City Purchasing, Finance Department, 2nd Floor,City Hall,3519 Liberty Drive,Pearland,Texas,77581. 2 Non-collusion Statement Bidder has submitted a completed and signed copy of the Submitted Non-Collusion Statement 3 General Conditions Bidder has read and agrees to the General Conditions set Agrees forth by the City of Pearland. 4 Specification Acknowledgement Bidder has reviewed specifications and agrees that their Agrees bid adheres fully. 5 Local Bidder Bidder claims Pearland local bidder preference,pursuant Not Local Bidder to provisions of Local Bidder Preference claim form and Texas Local Govemment Code,Chapter 271.9051 C 0413-50 Addendum 2- Page 2 of 17 Page 1 of 4 Charles D. Gooden Consulting Engineers, Incorporated-TBPE 4176 June 3,2013 ,�� Bids Opened: May 30,2013,2PM ( ' Bid Tabulation City of Pearland Old Alvin Road Waterline-John Lizer Road to McHard Road Project No.WA1101 Bid No. 0413-50 Addendum 2 Bid Opening: May 30,2013 at 2:00 pm Specification Responses SER Construction Partners, LLC 'Line Description UOM QTY 'Unit 'Extended 1 Base Bid 1 0 1 Mobilization (MAXIMUM VALUE IS LIMITED 1.1 TO 3%OF TOTAL BID) LS 1 $100,000.00 $100,000.00 1.2 Traffic control and regulation LS 1 $40,000.00 $40,000.00 1.3. Flagmen LS 1 $40,000.00 $40,000.00 1.4 Tree and plant protection LS 1 $35,000.00 -$35,000.00 Storm water pollution prevention plan 1.5 implementation LS 1 $364.00 $364.00 1.6 Reinforced Filter Fabric Barrier LF 11950 $2.00 $23,900.00 1.7 Inlet Protection Barrier LF 1800 $7.00 $12,600.00 1.8 Sediment Control Fence LF 250 $3.00 - $750.00 1.9 Sand Bags EA 10 $55.00 $550.00 1.10 Stabilized Construction Exit(Install) SY 1200 $20.00 '.$24,000.00 1.11 Stabilized Construction Exit(Remove) SY 1200 $2.00 $2,400.00 1.12 Trench Safety System LF 12660 $0.10 . $1,266.00 1.13 Project Identification Signs EA 2 $641.00 $1,282.00 1.14 Clearing and Grubbing AC 11 $2,000.00 . $22,000.00 Remove and Dispose-Concrete Sidewalk- 1.15 6'Width SY 980 $6.00 .' $5,880.00 1.16 Replace Concrete Sidewalk-6'Width SY 980 $40.00 $39,200.00 1.17 Remove and Dispose-Concrete Driveways SY 286 $7.00 $2,002.00 1.18 Replace Concrete Driveways SY 286 $41.00 $11,726.00 1.19 Remove and Dispose-Asphalt Driveways SY 164 $8.00 - $1,312.00 1.20 Replace Asphalt Driveways-See Detail SY 164 $38.00 '_ $6232.00 Remove and Dispose-Asphalt Roadway 1.21 (For Open Cut Water Line Installation) SY 294 $9.00 .$2,646.00 Replace Asphalt Roadway-See Detail (For 1.22 Open Cut Water Line Installation) SY 294 $37.00 ; $10,878.00 Remove and Dispose-Concrete Roadway 1.23 (For Open Cut Water Line Installation) SY 199 $8.00 $1,592:00 Replace Concrete Roadway-See Detail (For 1.24 Open Cut Water Line Installation) SY 199 $43.00 ; $8,557.00 1.25 Hydromulch Seeding AC 11 $1,300.00 $14,306.00 1.26 Sodding SY 50 $5.00 , ` $250.00 Prepatory Work related to Underground Utility Construction in Potentially Petroleum 1.27 Contaminated Area (PPCA) LS 1 $22,000.00 $22,000.00 Remove& Replace Existing Iron Fence(STA 1.28 51+46 to STA 54+35) LS 1 $2,600.00 $2,600.00 Install&Remove Temporary Chain Link 1.29 Fence(STA 51+46 to STA 54+35) LS 1 $5,600.00 ' $5,600.00 1.30 Remove& Reinstall Existing Street Signs LS 1 $5,000.00 ' $5,000.00 ( 1°P..\ Page 2 of 4 Charles D.Gooden Consulting Engineers, Incorporated-TBPE 4176 June 3,2013 Bids Opened: May 30,2013,2PM Specification Responses SER Construction Partners, LLC 20-inch Ductile Iron Pipe(Class 52)w/welded 36 steel casing Inc! Restrained joints, FKM Viton Gaskets&appurtenances complete-in- place(Auger)in PPCA. Excavation, handling, and disposal of contaminated ground water and soils is also included in this 1.31 line item-(at FM 518/Old Alvin crossing) LF 184 $970.00 $1.78,48000 20-inch pvc water main and Appurtenances 1.32 Complete-in-place(open cut) LF 8702 $102.00 $887,604.00 20-inch pvc water main and Appurtenances . 1.33 Complete-in-place(auger) LF 339 $193.00 ' $65,427.00 20-inch Ductile Iron Pipe (Class 52)pipe w/welded 36 steel casing Inc! Restrained joints&appurtenances complete-in-place . 1.34 (Auger)- (Drainage Culvert Sta 65+25) LF 60 $732.00 . $43,920.00 20-inch Ductile Iron Pipe (Pressure Class _ 250)pipe Inc! Restrained joints& appurtenances complete-in-place (Open Cut) 1.35 (at Swenson St-Sta 24+50)and (Sta.94+50) LF 470 $134.00 $62,98000 20-inch Ductile Iron Pipe (Pressure Class 250)pipe Inc! Restrained joints& . appurtenances complete-in-place (Open Cut) 1.36 -(at Walnut Road) LF 143 $170.00 $24,310.00 20-inch PVC Water Main Inc! Restrained joints&appurtenances complete-in-place 1.37 (Open Cut) LF 2018 $90.00 $181;62000 16-inch Ductile Iron Pipe (Pressue Class .. 250) pipe Ind Restrained joints& appurtenances complete-in-place (Open Cut) 1.38 (by FM 518 16-inch connection) LF 60 $330.00 .$19,800:00 20-inch Steel Pipe Above Ground (Sta. 1.39 26+00 and 94+50)per AWWA requirements LF 338 $225.00 $76,050.00 . 12-inch Steel casing for 8-inch SDR-26 PVC . 1.40 Pipe(Sta. 61+90) LF 20 $250.00 $5,00000 20-inch Ductile Iron Pipe (Pressure Class 250)w/welded 36 steel casing Inc! _ Restrained joints&appurtenances complete- in-place (Open cut)- (Drainage Culvert Sta 1.41 68+60) LF 60 $400.00 . --$24,000.00 1.42 10-inch PVC pipe include Restrained Joint LF 25 $200.00 $6,000 00 1.43 8-inch pvc pipe include Restrained Joint LF 778 $80.00 $62,240.00 20-inch Ductile Iron Pipe (Pressure Class • 250) pipe&appurtenances complete-in-place 1.44 (Open Cut)- (Sta 57+15 to 65+87) LF 315 $144.00 $45,360.00 1.45 3-inch pvc pipe include Restrained Joint LF 63 $40.00 $2,520.00 1.46 6-inch pvc pipe include Restrained Joint LF 787 $60.00 $47,220.00 1.47 6-inch pvc pipe(Auger) LF 55 $70.00 . - $3,850.00 Page 3 of 4 Charles D.Gooden Consulting Engineers, Incorporated-TBPE 4176 June 3,2013 Bids Opened: May 30,2013,2PM Specification Responses SER Construction Partners, LLC Water tap&Polyethylene service Line short 1.48 side(1") EA 1 $750.00 $750.00 Water tap&Polyethylene service Line long 1.49 side(1") EA 11 $1,300.00 $14,300.00 Water tap& Polyethylene service Line short 1.50 side(2") EA 1 $1,300.00 $1,300.00 Water tap&Polyethylene service Line long 1.51 side(2") EA 5 $2,200.00 $11,000.00 Water tap&PVC service Line short side (3" 1.52 thru 4") EA 3 $500.00 $1,500.00 Water tap&PVC service Line long side(3" 1.53 thru 4") EA 1 $1,500.00 $1,500.00 1.54 3"Wet Connection EA 2 $350.00 ` $700.00 1.55 4"Wet Connection EA 3 $500.00 $1,500.00 1.56 6"Wet Connection EA 4 $700.00 $2,800.00 1.57 8"Wet Connection EA 8 $900.00 $7,200.00 1.58 10"Wet Connection EA 2 $1,000.00 - $2,000.00 1.59 20"Wet Connection EA 2 $3,800.00 $7,600.00 1.60 16"Tapping Sleeve and Valve EA 1 $15,000.00 $15,000.00 1.61 Cut,Plug&Abandon Exist. 12"Water Line EA 1 $400.00 $400.00 1.62 Cut,Plug&Abandon Exist. 10"Water Line EA 1 $400.00 $400.00 1.63 Cut,Plug&Abandon Exist. 8"Water Line EA 11 $300.00 $3,300.00 1.64 Cut,Plug&Abandon Exist. 6"Water Line EA 4 $200.00 $800.00 1.65 Cut, Plug&Abandon Exist.4"Water Line EA 2 $120.00 $240.00 1.66 Cut, Plug&Abandon Exist. 3"Water Line EA 1 $110.00 $110.00 Fire hydrant Assembly Ind6"branch, gate 1.67 valve&box complete-in-place EA 35 $5,000.00 $175,000.00 1.68 Remove&salvage fire hydrant EA 9 $200.00 $1,800.00 Remove& replace 20 LF of 12" SDR 26 San. 1.69 Swr. Centered over prop.WL EA 2 $3,500.00 , $7,000.00 Remove&replace 20 LF of 8"SDR 26 San. ' 1.70 Swr. Centered over prop. WL EA 3 $3,000.00 $9,000.00 1.71 20-inch Butterfly Valve complete in place EA 17 $3,200.00 . $54,400.00 Air Release Valves on 20-inch Steel Water 1.72 Line EA 2 $1,300.00 $2,600.00 Air Release Valve on 20-inch PVC in 1.73 Manhole EA 1 $17,000.00 $17,000:00 "Elevated Water Line Crossings Including ' Drilled Piers, Box Beam, and Appurtenances, , 1.74 at Mary's Creek and Town Ditch" LS 2 $80,000.00 ' $160,000.00 1.75 Regrade Existing Swales and Roadside Ditch LF 4685 $4.00 $18,740.00 Remove and dispose of asphaltic/concrete - surfacing with or without base, all 1.76 thicknesses SY 6400 $6.00 ' $38,400.00 1.77 Pavement Repair and Resurfacing SY 6400 $36.00 $230,400.00 Remove and dispose of 18-24-inch RCP All 1.78 Depths LF 86 $20.00 ' $1,720.00 Page 4 of 4 Charles D. Gooden Consulting Engineers, Incorporated-TBPE 4176 June 3,2013 Bids Opened: May 30,2013,2PM Specification Responses SER Construction Partners, LLC Remove and dispose of 36-48-inch RCP All 1.79 Depths LF 942 $25.00 $23,550.00 Removed and dispose of Sanitary Sewer-All 1.80 Depths LF 20 $28.00 $560.00 Remove and dispose storm sewer inlet-All 1.81 Types EA 13 $200.00 ` $2,600.00 1.82 Cut Plug Abandon exist 18"Storm Sewer EA 2 $300.00 $600.00 1.83 Cut Plug Abandon exist 24"Storm Sewer EA 1 $400.00 $400.00 Type"A" Inlet on 5'x 4'Precast Reinforced 1.84 Concrete Box Storm Sewer EA 12 $2,300.00 -$27,60000 1.85 Type"A" Inlet on 36" RCP Storm Sewer EA 2 $3,400.00 $6,800.00 Type"C"manhole for 42-inch diameter and 1.86 smaller sewers EA 2 $2,100.00 $4,200.00 Precast Manhole on 5'x 4' Precast 1.87 Reinforced Concrete Box Storm Sewer EA 4 $900.00 $3,600.00 18-inch diameter RCP storm sewer by open 1.88 cut LF 10 $82.00 _$820.00 24-inch diameter RCP storm sewer by open • 1.89 cut LF 95 $83.00 ._. $7,885.00 36-inch diameter RCP storm sewer by open " 1.90 cut LF 285 $124.00 $35,34000 5'x 4' Precast Reinforced Concrete Box 1.91 Storm Sewer LF 810 $300.00 .$243,000.00 Pre-Cast Junction Box(See details on - 1.92 Sheets 45B and 45C) EA 1 $8,000.00 : $8,00000 1.93 Curb, Curb&Gutter, and Headers LF 140 $25.00 $3,500:00 These items are extra work items and are to - be used only if ordered by the Owner's Engineer or Construction Manager. No ' compensation will be received for any part of the quantities unless they are ordered and used on the job. The cost of these items should be included in the total construction 2 bid. Groundwater control for open cut - - 2.1 construction LF 500 $28.00 $14,000.00 2.2 20-inch Butterfly Valve complete in place EA 5 $3,500.00 ' ` .$17,50000 Additional Removal of Concrete Pavements, 2.3 With or Without base SY 300 $6.00 $1,800:00 Additional Replacement of Concrete 2.4 Pavements SY 300 $45.00- -- -$13,500.00 Additional Removal of Asphalt Pavements, • 2.5 With or Without base SY 300 $6.00 $1',800.00. Additional Replacement of Asphalt 2.6 Pavements SY 300 $45.00 • $13500.00 2.7 Hand Excavation CY 10 $20.00 -,- $200.00 Total ; $3,398,483.00 CITY OF PEARLAND STANDARD FORM OF AGREEMENT Section 00500 STANDARD FORM OF AGREEMENT THIS AGREEMENT is by and between City of Pearland (hereinafter called OWNER or City) and SER Construction Partners, LLC (hereinafter called CONTRACTOR). OWNER and CON TRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK CONTRACTOR shall complete all work as specified or indicated in or reasonably inferable from the Contract Documents (hereinafter the "Work"). The Work is generally described as follows: Old Alvin Road Water Line From John Lizer Road to McHard Road City of Pearland,Texas COP PN: WA1101 BID NO.: 0413-50 Article 2. ENGINEER The Work has been designed by Charles D. Gooden Consulting Engineers (TBPE # F- 4176), 2320 Holmes Road, Suite A, Houston, TX 77051, Engineer-of-Record: Leon E. Hoch, P.E. who is hereinafter called ENGINEER and who is to assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. CONTRACT TIME 3.1 The Work will be Substantially Complete (as defined in Article 1 of the General Conditions) within one-hundred eighty (180) days (including weekends and holidays) from the date when the Contract Time commences to run as provided in paragraph 5.01 of the General Conditions (as revised in the Special Conditions if applicable), and completed and ready for Final Payment within two-hundred ten (210) days from the date when the Contract Time commences to run. No work will be allowed on Sundays. 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 5 of the General Conditions. OWNER and CONTRACTOR also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration preceding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for 10-2012 00500- 1 of7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT delay(but not as a penalty) CONTRACTOR shall pay OWNER one-hundred fifty dollars ($150.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time set out in the Certificate of Substantial Completion or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER one-hundred fifty dollars ($150.00) for each day that expires after the time specified in the Certificate of Substantial Completion for completion and readiness for Final Payment. 3.3 Inspection Time. Working hours for the Pearland Inspection personnel are from 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding City approved holidays. The Contractor shall notify the OWNER of any required inspection overtime work at least 48 hours in advance and shall pay the overtime wages for the required City inspections. Article 4. CONTRACT PRICE 4.1 OWNER shall pay CON TRACTOR for completion of the Work in strict accordance with the Contract Documents in current funds $3,398,483.00 (the"Contract Price"). The Contract Price includes the Base Bid as shown in Document 00300 — Bid Proposal. Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Section 6.0 "Measurement and Payment" of the General Conditions. Application for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1 Progress Payments. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER as provided below. All progress payments will be on the basis of the progress of the Work and actual quantity of Work completed, in accordance with Article 6 "Measurement and Payment" of the General Conditions. 5.1.1 Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage or actual quantity of Work complete, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with the General Conditions. The OWNER shall make payment within 30 days of receipt of application for payment by the ENGINEER. 5.1.2 Each progress payment shall be less retainage as specified in Paragraph 6.06 of the General Conditions, and further less all previous payments and all further sums that may be retained by the OWNER under the terms of this Agreement. It is understood, however, that in case the whole work be near to completion and some unexpected and unusual delay occurs due to no 10-2012 00500-2 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT (4.26` fault or neglect on the part of the CONTRACTOR, the OWNER may upon written recommendation of the ENGINEER pay a reasonable and equitable portion of the retained percentage to the CONTRACTOR, or the CONTRACTOR at the OWNER's option, may be relieved of the obligation to fully complete the Work and, thereupon, the CONTRACTOR shall receive payment of the balance due him under the contract subject only to the conditions stated under"Final Payment." 5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 6.09of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 6.09. Article 6. INTEREST Interest on any overdue payment from OWNER to CONTRACTOR shall be paid in accordance with the provisions of Chapter 2251.025 of the Texas Government Code, as amended. Article 7. CONTRACTOR'S REPRESENTATIONS In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations: 7.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. 7.2 CONTRACTOR has studied carefully all available surveys, assessments, reports of explorations, investigations, and tests of subsurface conditions and drawings of physical conditions of the site. Such technical reports and drawings are not Contract Documents, and Owner makes no representations or warranties as to the accuracy of such documents or information, or to whether or not they are complete, comprehensive, or all-inclusive. 7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraphs 7.2 above) which pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work ,and CONTRACTOR assumes the risk of such subsurface and physical conditions, and shall furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, explorations,tests,reports, and studies or similar information or data are or will be required by CONTRACTOR for such purposes. rik\ 10-2012 00500-3 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT Cimk\, 7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract documents with respect to existing underground facilities at or contiguous to the site and assumes responsibility for the accurate location of said underground facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said underground facilities are or will be required by CONTRACTOR in order to perform and finish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents. 7.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, explorations, tests,reports, and studies with the terms and conditions of the Contract Documents. 7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies in the Contract Documents of which Contractor knew or should have known, and CONTRACTOR shall perform the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including any written resolution of any such conflict, error or discrepancy by ENGINEER. In the event of a conflict that was not brought to the OWNER's or ENGINEER's attention prior to the bid, the CONTRACTOR is assumed to have bid the most expensive alternative. Article 8. CONTRACT DOCUMENTS The Contract Documents, which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work, consist of the following, each of which are incorporated herein by reference: 8.1 Standard Form of Agreement(Section 00500). 8.2 Performance, Payment, and/or Maintenance Bonds (Sections 00610, 00611, and 00612). 8.3 General Conditions of Agreement (Section 00700), including Attachment No. 1 Workers' Compensation Insurance Coverage, Attachment No. 2 Agreement for Final Payment and Contractor's Sworn Release, and Attachment No. 3 Owner's Insurance Requirements of Contractor. 8.4 Special Conditions of Agreement(Section 00800). 8.5 Plans, consisting of sheets numbered 1 through 81, Total of ninety-two (92) sheets, inclusive with attachments with each sheet bearing the following general title: Old Alvin Road 20-Inch Water Line 8.6 Instructions to Bidders and CONTRACTOR's Bid Proposal, including any Addenda referenced therein. 8.7 Technical Specifications for the Work. 10-2012 00500-4 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT 8.8 The following, which may be delivered or issued after this Agreement becomes effective: Any Change Orders or other documents amending, modifying, or supplementing the Contract Documents in accordance with the General Conditions. There are no Contract Documents other than those listed above in this Article 8. The Contract Documents may only be amended,modified or supplemented as provided in the General Conditions. Article 9. MISCELLANEOUS 9.1 Terms used in this Agreement which are defined in Section 1, `Definitions and Interpretations" of the General Conditions will have the meanings indicated in the General Conditions. 9.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns (lb.\ and legal representative to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents. 9.4 CONTRACTOR agrees to warranty the Work for a period of one (1) year from Substantial Completion against defects in materials and workmanship. CONTRACTOR agrees to repair or replace any defective work within this warranty period immediately unless such repairs require long lead time materials and equipment in which case CONTRACTOR shall provide an agreeable schedule for repairs at no additional cost to OWNER. 9.5 The Work will be completed according to the Contract Documents and in accordance with codes, ordinances, and construction standards of the City of Pearland, and all applicable laws, codes and regulations of governmental authorities. 9.6 In the event any notice period required under the Contract Documents is found to be shorter than any minimum period prescribed by applicable law, the notice period required shall be construed to be the minimum period prescribed by applicable law. 9.7 This Contract and the Contract Documents, insofar as they relate in any part or in any way to the Work undertaken therein, constitute the entire agreement between - the parties hereto, and it is expressly understood and agreed that there are no rumn‘ agreements or promises by and between said parties, except as aforesaid, and that any additions thereto or changes shall be in writing. 10-2012 00500-5 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT 9.8 The provisions of this Contract shall be applied and interpreted in a manner consistent with each other so as to carry out the purposes and the intent of the parties, but if for any reason any provision is unenforceable or invalid, such provisions shall be deemed severed from this Contract and the remaining provisions shall be carried out with the same force and effect as if the severed provision had not been part of this Contract. 9.9 The headings of the paragraphs are included solely for the convenience of reference and if there is any conflict between the headings and the text of this Contract, the Contract text shall control. 9.10 The waiver of any breach hereof shall not constitute a waiver of any subsequent breach of the same or any other provision hereof. Failure by the OWNER in any instance to insist upon observance or performance by CONTRACTOR shall not be deemed a waiver by CONTRACTOR of any such observance or performance. No waiver will be binding upon OWNER unless in writing and then will be for the particular instance only. Payment of any sum by OWNER to CONTRACTOR with knowledge of any breach or default will not be deemed a waiver of such breach or default or any other breach or default. 9.11 The CONTRACTOR acknowledges that the OWNER(through its employee handbook)considers the following to be misconduct that is grounds for termination of an employee of the OWNER: Any fraud, forgery,misappropriation of funds, receiving payment for services not performed or for hours not worked,mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the OWNER. The CONTRACTOR agrees that it will not,directly or indirectly; cause an employee of the OWNER to engage in such misconduct. 10-2012 00500-6 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to OWNER and one to CONTRACTOR. This Agreement will be effective upon execution and attestation by authorized representatives of the City of Pearland and upon the following date: , 20— OWNER: CONTRACTOR: CITY OF PEARL SER Construction P ers LL . By: By: Rosbel E. Ramos Title: Title: President Date: ( -/6-J,' Date: orpor ea1Y' ATTEST • ATTEST Addr s for givin tires 'QE ..... 36 6 Pasade Blvd. _ Pasadena, Texas 77503 U:, i�trs 3r, Phone: 713-473-7900 Fax: 713-473-7919 Agent for service of process: Rosbel E. Ramos END OF SECTION 10-2012 00500-7 of 7 CITY OF PEARLAND PERFORMANCE BOND Section 00610 Bond No. 46BCSGK9823 PERFORMANCE BOND STATE OF TEXAS § COUNTY OF BRAZORIA § KNOW ALL MEN BY THESE PRESENTS: That SER Construction Partners,LLC of the City of Pasadena , County of Harris , and State of Texas, as principal, and Hartford Fire Insurance Company authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee (Owner), in the penal sum of$ 3,398,483.00 for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns,jointly and severally, by these presents: WHEREAS, the Principal has entered into a certain written contract with the Owner, effective as of the day of , 20_, (the "Contract") to commence and complete the construction of certain improvements described as follows: Old Alvin Road Water Line from John Lizer Road to McHard Road City of Pearland,Texas COP PN:WA1101 BID NO.: 0413-50 which Contract, including the Contract Documents as defined therein, is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Contract Work and shall in all respects duly and faithfully observe and perform all and singular the covenants, conditions, and agreements in and by said Contract agreed and covenanted by the Principal to be observed and performed, and according to the true intent and meaning of said Contract and Contract Documents, then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the Work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time,alteration or addition to the terms of the Contract, or to the Work to be performed thereunder. 12/2007 00610-1 of 2 CITY OF PEARLAND PERFORMANCE BOND IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of ,20— Principal:SER Construction Partners,LLC Surety: art..i d Fir; I urance Company By: By: 'hill a Ba!r Rosbe . os,President , Title: Title:Attorney-In-Fact Address: Address: P.O.Box 891145 3000 Internet Boulevard,Suite 600 = Houston,Texas 77289 Frisco.TX 75034 Telephone: (713)473-7900 Telephone: (800)873-8212 - . -Fax: (713)473-7919 Fax: (866)275-5989 NOTICE:THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF.INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. END OF SECTION J 12n007 00610-2 61'2 CITY OF PEARLAND PAYMENT BOND Section 00611 Bond No. 46BCSGK9823 PAYMENT BOND STATE OF TEXAS § COUNTY OF BRAZORIA § KNOW ALL MEN BY THESE PRESENTS: That SER Construction Partners, LLC of the City of Pasadena , County of Harris , and State of Texas, as principal, and Hartford Fire Insurance Company authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee (Owner), in the penal sum of$ 3,398,483.00 for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators. executors, successors, and assigns,jointly and severally, by these presents: WHEREAS, the Principal has entered into a certain written contract with the Owner, effective as of the day of , 20 , (the "Contract") to commence and complete the construction of certain improvements described as follows: Old Alvin Road Water Line from John Lizer Road to McHard Road City of Pearland,Texas COP PN: WA1101 BID NO.:0413-50 which Contract, including the Contract Documents as defined therein, is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor or material to him or a subcontractor in the prosecution of the Work provided for in said Contract, then, this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the Work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond,and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work to be performed thereunder. 7\ 07/2006 00611 - 1 of 2 CITY OF PEARLAND PAYMENT BOND IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of ,20— Principal:SER Construction Part LLC Surety: art iird F re Insu!a a Company By: By lip Rosbel E.Rf( : Phjj President Title: Title:Attorne -Fact Address: Address: P.O.Box 891145 3000 Internet Boulevard,Suite 600 Houston,Texas 77289 Frisco,TX 75034 Telephone: (713)473-7900 = P Telephone: (800)873-8212 - — Fax: (713)473-7919 Fax: (866)275-5989 NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. END OF SECTION \ ; 07/2006 00611 -2 oft CITY OF PEARLAND ONE-YEAR MAINTENANCE BOND Section 00612 Bond No. 46BCSGK9823 ONE-YEAR MAINTENANCE BOND STATE OF TEXAS § COUNTY OF BRAZORIA § KNOW ALL MEN BY THESE PRESENTS: That SER Construction Partners, PLC of the City of Pasadena , County of Harris , and State of Texas, as principal, and Hartford Fire Insurance Company authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee (Owner), in the penal sum of$ 3,398,483.00 for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns,jointly and severally, by these presents: WHEREAS, the Principal has entered into a certain written contract with the Owner, effective as of the day of , 20_, (the "Contract") to commence and complete the construction of certain improvements described as follows: Old Alvin Road Water Line from John Lizer Road to McHard Road City of Pearland,Texas COP PN: WA1101 BID NO.:0413-50 which Contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully correct all such work not in accordance with the Contract Documents discovered within the one-year period from the date of substantial completion,then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract,or to the work to be performed thereunder. 07/2006 00612- 1 oft CITY OF PEARLAND ONE-YEAR MAINTENANCE BOND IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of ,20_ Princip : R Construction Partners,LLC Surety- art d ire In/ r nce Company By: By:WINk Rosbel E. Title: , resident Title:Attorne -Fact Address: Address: P.O.Box 891145 3000 Internet Boulevard,Suite 600 - - Houston,Texas 77289 Frisco,TX 75034 Telephone: (713)473-7900 Telephone: (800)873-8212 / \ Fax: (713)473-7919 Fax: (866)275-5989 Cub.' NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. END OF SECTION 07/2006 00612-2 of 2 Direct Inquiries/Claims to: POWER OF ATTORNEY THE HARTFORD BOND,T-4 ONE HARTFORD PLAZA HARTFORD,CONNECTICUT 06155 call:888-266-3488 or fax:860-757-5835 r:NOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 61-615323 X Hartford Fire Insurance Company,a corporation duly organized under the laws of the State of Connecticut X Hartford Casualty Insurance Company,a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company,a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois,a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast,a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the"Companies")do hereby make, constitute and appoint, up to the amount of unlimited: Edward Arens, Philip Baker,Michele Bonnin of The Woodlands, TX their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies)only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof,on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and. executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on August 1, 2009 the Companies have caused these presents to be signed by its Vice President and its corporate seals to be hereto affixed,duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies,the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. lancer .s7fr1 ,. },itrs y t wf!! . ,�1 ;�,ta•a!•rti.f a vim _ ^_ 3 ,' F'�..�t+Vo !t rOnahtvt r�®IM' l8 Z®F•_ ;- tD 7 9 • ..' �. �.' irA��19�� ► ;`y oi5inu••• -�z,FriWJ Wesley W.Cowling,Assistant Secretary M.Ross Fisher,Vice President STATE OF CONNECTICUT ss. Hartford COUNTY OF HARTFORD On this 12th day of July, 2012, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say:that he resides in the County of Hartford, State of Connecticut;that he is the Vice President of the Companies, the corporations described in and which executed the above instrument;that he knows the seals of the said corporations;that the seals affixed to the said instrument are such corporate seals;that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. MKT tl/R_It.L ,A-,j-}t?inA a tf • iiusuc"fir • Kathleen T.Maynard Notary Public _ • -_ CERTIFICATE My Commission Expires July 31,2016 I, the undersigned, Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which is still in full force effective as of Signed and sealed at the City of Hartford. 0.-rt W ta .. oswp ��r. x��ltrs_yf tw g iw� ,..�.gp�� O r v `it• r�t4et rl E.ftt�f a �us r -� f"! r!p•-:- ouse•o .-<�:, 1 ..Su. Vu.r.r 401.. : 1 9 7 9 j.•Yt 1 9s. 4.1 � 4 �f-��..•\: �Me�sN� +Ip-�!•.l • V•�•••�t L1�p15 rims•' • Gary W.Stumper,Vice President . , WI' IJ:IE �`' JIARTFORD Inquiries Regarding Claims Hartford Fire Insurance Company Twin City Insurance Company Hartford Casualty Insurance Company Hartford Insurance Company of Illinois Hartford Accident and Indemnity Company Hartford insurance Company of the Midwest Hartford Underwriters Insurance Company Hartford Insurance Company of the Southeast Please address inquiries regarding Claims for all surety and fidelity products issued by The Hartford's underwriting companies to the following: Phone Number : 888-266-3488 Fax - Claims : 860-757-5835 or 860-547-8265 E-mail : claims@lstepsurety.com Mailing Address : The Hartford The Hartford Fidelity&Bonding (BOND) Hartford Plaza 690 Asylum Avenue Hartford, CT 06115 CITY OF PEARLAND PARTIAL WAIVER OF LIEN Section 00615 PARTIAL WAIVER OF LIEN AND PAYMENT AFFIDAVIT The undersigned contracted with City of Pearland to furnish Construction of Old Alvin Road Water Line from John Lizer Road to McHard Road in connection with certain improvements to real property located in the City of Pearland, TX and owned by the City of Pearland which improvements are described as follows: Old Alvin Road Water Line from John Lizer Road to McHard Road. Approximately 13,000 linear feet of new 20- inch diameter water line and associated service transfers,water line abandonment, pavement removal and replacement, and storm sewer removal and replacement. . In consideration of Pay Estimate No. in the amount of$ the undersigned, on oath, states that all persons and firms who supplied labor and materials to the undersigned in connection with said Project will be fully paid within 30 days of the date of this document by the undersigned for such work through In consideration of the payment herewith made,the undersigned does fully and finally release and hold harmless the City of Pearland and its surety, if any, through the above date from any and all claims, liens,or right to claim or lien, arising out of this Project under any applicable bond, law or statue. It is understood that this affidavit is submitted to induce payment of the above sum and for use by the City of Pearland in assuring the Owner and others that all liens and claims relating to the said Project furnished by the undersigned are paid. Signature Printed Name&Title Company Name State of County of Subscribed and sworn to,before me,this day of , 20 My Commission Expires: Notary Public 5-12-12 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT Section 00700 GENERAL CONDITIONS OF AGREEMENT TABLE OF CONTENTS Page No. 1.0 DEFINITIONS AND INTERPRETATIONS 1 1.01 Owner, Contractor and Engineer 1.02 Contract Documents 1.03 Subcontractor 1.04 Written Notice 1.05 Work 1.06 Extra Work 1.07 Work Day 1.07-1 Rain Day 1.07-2 Impact Day 1.08 Calendar Day 1.09 Substantially Completed 1.10 Interpretation of Words and Phrases 1.11 Referenced Standards 1.12 Contract Time 1.13 Construction Inspector 1.14 Balancing Change Order 2.0 RIGHTS AND RESPONSIBILITIES OF THE OWNER 4 2.01 No Warranty of Design 2.02 Right of Entry (116.'\ 2.03 Ownership of Plans 10-2012 00700-i CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 2.04 Changes and Alterations 2.05 Damages 3.0 RIGHTS AND RESPONSIBILITIES OF THE ENGINEER 6 3.01 Owner-Engineer Relationship 3.02 Keeping of Plans and Specifications Accessible 3.03 Preliminary Approval 3.04 Inspection by Engineer 3.05 Determination of Questions and Disputes 3.06 Recommendation of Payment 4.0 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR 8 4.01 Independent Contractor 4.02 Contractor's Understanding 4.03 Laws and Ordinances 4.04 Assignment and Subletting 4.05 Performance and Payment Bonds [and Maintenance Bond] 4.06 Insurance 4.07 Permits and Fees 4.08 Texas State Sales Tax 4.09 Contractor's Duty and Superintendence 4.10 Character of Workers 4.11 Labor,Equipment,Materials, Construction Plant and Buildings 4.12 Sanitation 4.13 Cleaning and Maintenance 4.14 Performance of Work (111.1. 4.15 Right of Owner to Accelerate the Work 10-2012 00700-ii CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT 4.16 Layout of Work 4.17 Shop Drawings 4.18 Engineer-Contractor Relationship; Observations 4.19 Observation and Testing 4.20 Defects and Their Remedies 4.21 Liability for Proper Performance 4.22 Protection Against Accident To Employees and the Public 4.23 Protection of Adjoining Property 4.24 Protection against Claims of Subcontractors, Laborers,Materialmen, and Furnishers of Equipment,Machinery and Supplies 4.25 Protection Against Royalties or Patented Invention 4.26 Indemnification 4.27 Losses From Natural Causes 4.28 Guarantee 5.0 PROSECUTION AND PROGRESS 18 5.01 Time and Order of Completion 5.02 Extension of Time 5.03 Hindrances and Delays 5.04 Suspension of Work 5.05 Liquidated Damages for Delay 5.06 Change of Contract Time 5.07 Delays Beyond Owner's and Contractor's Control 6.0 MEASUREMENT AND PAYMENT 21 6.01 Discrepancies and Omissions (111'\ 6.02 Quantities and Measurements 10-2012 00700-iii CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (°.b 6.03 Estimated Quantities 6.04 Price of Work 6.05 Payments 6.06 Partial Payments 6.07 Use of Completed Portions &Punchlist 6.08 Substantial Completion 6.08-1 6.09 Final Payment 6.10 Correction of Work Before Final Payment 6.11 Correction of Work After Final Payment 6.12 Payments Withheld 6.13 Delayed Payments Culb'\ 7.0 EXTRA WORK AND CLAIMS 27 7.01 Differing Site Conditions 7.02 Change Orders 7.03 Change Orders 7.04 Request for Work Approval for Work on Non-Work Days 7.05 Minor Changes 7.06 Extra Work 7.07 Time of Filing Claims 8.0 DEFAULT 30 8.01 Default by Contractor 8.02 Supplementation of Contractor Forces 8.03 Cumulative Remedies& Specific Performance 8.04 Cross-Default 10-2012 00700-iv CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 7\: 8.05 Insolvency 8.06 Contingent Assignment 8.07 Waiver of Consequential Damages 8.08 Termination for Convenience 8.09 Default by Owner 9.0 DISPUTE RESOLUTION 35 ATTACHMENT NO. 1: WORKERS' COMPENSATION INSURANCE COVERAGE Al ATTACHMENT NO. 2: AGREEMENT FOR FINAL PAYMENT AND CONTRACTOR'S SWORN RELEASE B1 ATTACHMENT NO. 3: OWNER'S INSURANCE REQUIREMENTS OF CONTRACTOR Cl • (sulk\ 10-2012 00700-v CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Clumh\ Section 00700 GENERAL CONDITIONS OF AGREEMENT 1.0 DEFINITIONS AND INTERPRETATIONS 1.01 OWNER, CONTRACTOR AND ENGINEER. The OWNER, the CONTRACTOR and the ENGINEER are those persons or organizations identified as such in the Agreement. The term ENGINEER as used in these General Conditions shall refer to the Engineer or Architect identified in the Agreement, as applicable, and means a person authorized to act as a representative of the entity designated by the OWNER to provide professional services required in connection with the preparation of plans and specifications of this Contract. The term CONSTRUCTION MANAGER as used in these General Conditions shall refer to the Construction Manager identified in the Agreement, as applicable, and means a person authorized to act as representative of the entity designated by the OWNER to provide professional services required in connection with the performance of the work of this Contract. The Owner's representative on the project site shall be the CONSTRUCTION MANAGER or ENGINEER as designated. • 1.02 CONTRACT DOCUMENTS. The Contract Documents shall consist of all of the documents identified in Article 8 of the Standard Form of Agreement, which documents, excluding such documents as may be delivered or issued after the Effective Date of the Agreement, as referenced in Article 8, shall be bound together in a Project Manual for the Work. C116.\, All references to the "Contract" or the "Agreement" in these General Conditions of Agreement shall include the Contract Documents. The Contract Documents are complementary, and what is required by one shall be binding as if required by all. In the event of any conflict among the Contract Documents, the Contract Documents shall govern in the following order: (1) Modifications in writing and signed by both parties,including any Change Orders; (2) Standard Form of Agreement; (3) Special Conditions of Agreement; (4) General Conditions of Agreement, including Attachment No. 1 — Workers'. Compensation Insurance Coverage, Attachment No. 2 — Agreement for Final Payment and CONTRACTOR'S Sworn Release, and Attachment No. 3 — Owner's Insurance Requirements of Contractor; (5) Addenda, if any; (6) Plans and Specifications referenced or included in the Project Manual; (7) Instructions to Bidders; (8) Bid Proposal; and 10-1012 00700- 1 of 36 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT (9) Exhibits: The following Exhibits, if any,attached hereto, are incorporated herein, and are a part of this Contract: In the event a conflict or inconsistency remains between or within the Contract Documents, or the Contract Documents and applicable standards, codes and ordinances, CONTRACTOR shall provide the greater quantity or better quality, or CONTRACTOR shall comply with the more stringent requirements, as determined by ENGINEER. Terms or phrases used in the Contract Documents with a well-known technical or construction industry meaning shall have such recognized meanings. References to standards, specifications, manuals or codes of any technical society, organization or association, or to the laws or regulations of any governmental authority, shall mean the latest in effect on the effective date of the Contract,unless otherwise stated in the Contract Documents. 1 .03 SUBCONTRACTOR. The term "subcontractor", as employed herein, includes those entities having a contract with the CONTRACTOR or a subcontractor for performance of work on the Project. OWNER shall have no responsibility to any subcontractor for performance of work on the Project contemplated by these Contract Documents, and any such subcontractor shall look exclusively to CONTRACTOR for any payments due subcontractor. 1.04 WRITTEN NOTICE. Written Notice shall be deemed to have been duly served if delivered in person or by electronic means through the Pro-Trak to the individual or to a partner of the partnership or joint venture, or to an officer of the corporation or company for whom it is ,� intended, or if delivered at or sent by Certified Mail, Return Receipt Requested, to the last known tl business address or registered office of such individual,partnership,joint venture or corporation or company, or to the address for giving notices listed in the Standard Form of Agreement. 1.05 WORK. Unless otherwise stipulated, the CONTRACTOR shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, services, insurance, and all water, light, power, fuel, transportation and all other facilities or services of any nature whatsoever necessary for the execution and completion of the Work described in the Standard Form of Agreement. Unless- otherwise specified, all materials shall be new, and both workmanship and materials shall be of good quality. The CONTRACTOR shall, if required by the ENGINEER as representative of the OWNER, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well-known, technical or trade meaning shall be held to refer to such recognized standards. All work shall be done and all materials shall be furnished in strict conformity with the Contract Documents. 1.06 EXTRA WORK. The term "Extra Work", as used in this Contract, shall be understood to mean and include all work that may be required by the ENGINEER as representative of the OWNER,to be performed by the CONTRACTOR to accomplish any change, alteration or addition to the work shown in the plans. Extra work shall be authorized in writing by the ENGINEER prior to commencement. Extra Work items are paid for on an as needed, as authorized basis only. 1.07 WORK DAY: As used herein, a "Work Day" is defined as any Monday through Friday, not a legal holiday, and any Saturday or Sunday specifically approved by the OWNER, in which the CONTRACTOR can perform six or more hours of work per the current construction schedule. CONTRACTOR agrees to request specific approval from the Construction Manager or 10-1012 00700-2 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Owner, in advance, to perform work on Saturdays or Sundays and in so doing agrees to pay all charges and costs for Inspection and or Construction Management services required during the performance of any such approved work. Refer to paragraph 7.05 for procedure to determine cost for Construction Management and Inspection Services for work on non-work days. 1.07-1 RAIN DAY: As used herein, is defined as any WORK DAY during which weather related conditions prevent the CONTRACTOR from performing four (4) or more consecutive hours of work on critical path items as identified in the current construction schedule. CONTRACTOR shall record Rain Days on the Pay Application each month for the review and possible approval by the OWNER. The approved Rain Day is then added to the Contract Time. (See 1.12 Contract Time below) 1.07-2 IMPACT DAY: As used herein, is a day that is added to the CONTRACT TIME by the OWNER by Change Order to extend the Contract Time by one full Work Day. (See 1.12 Contract Time below) Impact Days, once approved by the OWNER, shall extend the Contract Time on a one-to-one basis to replace a Work Day lost to conditions that prevented the CONTRACTOR from performing four (4) or more consecutive hours of work on critical path items. Impact Days are added to the Contract Time by Change Order only at the end of the work and then only if, in the opinion of the OWNER, a time extension is warranted due to delays beyond the control of the Contractor and required to complete the work within the Contract Time. 1.08 CALENDAR DAY. A "calendar day" is any day of the week, month or year no days being excepted. Unless otherwise expressly provided, all references to "day(s)" shall mean calendar day(s). 1 .09 SUBSTANTIALLY COMPLETED: The terms "Substantially Completed", or "Substantially Complete" or"Substantial Completion" as used in this Contract, shall mean that all major process components of the facility or work have been made suitable for use or occupancy, including appropriate documentation from the equipment suppliers that all of the individual components have been installed in accordance with the specifications and manufacturer's recommendations,the installations have been approved by the ENGINEER and the items have met the start-up and testing requirements of the contract documents or is deemed to be in a condition to serve its intended purpose or requires only minor miscellaneous work and adjustment to achieve Final Completion and Acceptance as determined by the ENGINEER. Upon compliance with the above referenced criteria,ENGINEER shall issue a Certificate of Substantial Completion. PARTIAL SUBSTANTIAL COMPLETION: designation will be given on components of the Work that must be placed into service prior to the completion of the entire Work. The contractor's One Year Warranty period for these items shall begin on the date of Partial Substantial Completion as designated by the ENGINEER. The ENGINEER shall determine and make all such designations. 1.10 INTERPRETATION OF WORDS AND PHRASES. Whenever the words "directed", "permitted", "designated", "required", "ordered", "considered necessary", "prescribed" or words of like import are used, it shall be understood that the direction, requirement,permission, order, opinion designation or prescription of the ENGINEER as the OWNER's representative is intended. Similarly, the words "approved", "acceptable", "satisfactory" or words of like import (001", shall mean that no exception is taken by ENGINEER, but does not relieve CONTRACTOR of responsibility for compliance with the Contract Documents. 10-1012 00700-3 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 7\1 Whenever in the Specifications or Plans of the Contract Documents, the terms of description of various qualities relative to finish, workmanship or other qualities of similar kind which cannot, from their nature, be specifically and clearly described and specified,but are necessarily described in general terms, the fulfillment of which must depend on individual judgment, then, in all such cases, any question of the fulfillment of said Specifications shall be decided by the ENGINEER as the OWNER's representative, and said work shall be done in accordance with his interpretations of the meaning of the words,terms or clauses defining the character of the work. 1.11 REFERENCED STANDARDS. No provision of any referenced standard specification, or manual shall be effective to change the duties and responsibilities of the Owner, Engineer, Contractor, or their consultants, employees, or representatives from those set forth in the Contract Documents, nor shall it be effective to assign to the Engineer or its consultants, employees, or representatives any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undertake responsibilities contrary to provisions of the Contract Documents. 1.12 CONTRACT TIME The term Contract Time as used herein, refers to the number of Calendar days provided to complete the work or the date, stated in the Agreement: (i) to achieve Substantial Completion, and (ii) to complete the Work so that it is ready for fmal payment as evidenced by ENGINEER's written recommendation of fmal payment in accordance with Paragraph 6.09 and as modified as a result of any authorized Extensions. C116*\ The established Contract Time includes 40 Rain Days per year, based on the average number of rain days per year for the period of June 1898 to December 1996 as recorded by the Alvin Weather Center Record. The Contract Time shall only be extended by (a) the addition of Rain Days equal to the number of actual Rain Days in excess of 40 days per year and (b) the number of Impact Days granted for delays, in the opinion of the Owner, beyond the control of the Contractor. The extension of the Contract Time shall be the CONTRACTOR's sole and exclusive remedy for delays. 1.13 CONSTRUCTION INSPECTOR The term "Construction Inspector" here in includes those professionals engaged by the OWNER to ensure CONTRACT work's compliance with the specifications and any applicable statutory requirements. 1.14 BALANCING CHANGE ORDER is a change order executed during the close-out process that may add/remove pay items, or adjust quantities of existing items or remove unused pay items or quantities Balancing Change Orders are used to reconcile the unit cost of the work performed or installed by the Contractor. 2.0 RIGHTS AND RESPONSIBILITIES OF THE OWNER 2.01 NO WARRANTY OF DESIGN. It is understood that the OWNER MAKES NO WARRANTY OF THE ADEQUACY, ACCURACY OR SUFFICIENCY OF THE PLANS AND SPECIFICATIONS OR ANY OTHER DESIGN DOCUMENTS, AND OWNER HEREBY EXPRESSLY DISCLAIMS ANY SUCH WARRANTY, EXPRESSED OR IMPLIED. Prior to commencing each portion of the Work, CONTRACTOR shall carefully study and compare the Ch"\. relevant Contract Documents, shall observe conditions at the site affecting the Work, and shall take field measurements of existing conditions related to the Work. Any errors, omissions or 10-1012 00700-4 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT inconsistencies in the Contract Documents noted by the CONTRACTOR, and/or any variance between the Contract Documents and applicable codes,standards or ordinances, shall be promptly reported by CONTRACTOR to ENGINEER in writing as a Request for Information. Work performed prior to a Request for Information shall be at the Contractor's risk. If CONTRACTOR fails to perform its obligations under this paragraph, CONTRACTOR shall pay such costs and damages to OWNER as would have been avoided if CONTRACTOR had reported any errors, omissions, inconsistencies or variances in the Contract Documents noted by CONTRACTOR or which should have been noted by a careful study of the Contract Documents. CONTRACTOR shall comply with the Contract Documents, all approved modifications thereof and additions and alterations thereto approved in writing by the OWNER. The burden of proof of such compliance shall be upon the CONTRACTOR to show that he has complied with the requirements of the Contract Documents and approved modifications thereof and all approved additions and alterations,thereto, as the same shall have been interpreted by the ENGINEER. 2.02 RIGHT OF ENTRY. The OWNER reserves the right to enter the property or location on which the work herein contracted for is to be performed, constructed or installed, for itself or such agent or agents as it may select, for the purpose of inspecting the work, or for the purpose of performing, constructing or installing such collateral work as the OWNER may desire. The OWNER shall have the right to make inspections at all reasonable times, and the CONTRACTOR hereby waives any claims for extension of time and/or compensation for any loss or damage if his work shall be delayed by reason of such inspection, performance, construction or installation of collateral work. 2.03 OWNERSHIP OF PLANS. All plans, specifications and copies thereof furnished by the OWNER shall not be reused on other work and, with the exception of the sets forming the part of the signed Contract Documents, are to be returned to the OWNER on request at the completion of the Work. All plans and models are the property of the OWNER. 2.04 CHANGES AND ALTERATIONS. The CONTRACTOR further agrees that the Owner may make such changes and alterations, additions and deletions as the OWNER may see fit, in the Work, including but not limited to changes in line, grade, form, dimensions, plans or specifications for the Work herein contemplated, or any part thereof, either before or after the beginning of construction, without affecting the validity of this Contract and the corresponding Performance and Payment Bonds. If such changes or alterations or deletions diminish the quantity or the value of the Work to be done, they shall not constitute the basis for a claim for compensation or damages, including lost or anticipated profits on the Work that may be affected. If the amount of Work is increased and the work can fairly be classified under the specifications, such increase shall be paid for according to the quantity actually done and at the unit price, if any, established for such work under this Contract, otherwise, such additional work shall be paid for as provided under Article 7 hereof for Extra Work. In case the OWNER shall make such changes or alterations as shall make useless any Work already done or material already furnished or used in said Work, then the OWNER shall compensate the CONTRACTOR for any material or labor so used and for any actual loss occasioned by such change due to actual expenses incurred in preparation for the Work as originally planned. 2.05 DAMAGES. In the event the OWNER is damaged in the course of the work by the act, negligence, omission, mistake or default of the CONTRACTOR, or should the 10-1012 00700-5 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT CONTRACTOR unreasonably delay the progress of the work being done by others on the job so as to cause loss for which the OWNER becomes liable, then the CONTRACTOR shall reimburse the OWNER for such loss. 3.0 RIGHTS AND RESPONSIBILITIES OF THE ENGINEER 3.01 OWNER-ENGINEER RELATIONSHIP. The ENGINEER shall serve as the OWNER'S representative during construction. The duties, responsibilities and limitations on the authority of the ENGINEER as the OWNER's representative during construction are set forth in the Contract Documents; and the ENGINEER shall not have authority to extend the OWNER's liability or to bind the OWNER for any additional liability of any nature whatsoever without the written consent of the OWNER. Any communications by the OWNER to the CONTRACTOR regarding the Work shall be issued through the ENGINEER. It is the intent of this Agreement that there shall be no delay in the execution of the Work; therefore, written decisions or directions rendered by the ENGINEER as the OWNER's representative shall be promptly carried out, and any claim arising therefrom shall be resolved as provided in Article 7. Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the OWNER'S representative shall have the authority to issue written stop work orders whenever such stoppage may be necessary to insure the performance of the Work in accordance with the Contract Documents. 3.02 KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE. The ENGINEER shall furnish the CONTRACTOR with four(4) copies of all Plans and Specifications without expense to the CONTRACTOR, and the CONTRACTOR shall keep one full size copy of the same constantly accessible on the job site, with the latest revisions noted thereon. The CONTRACTOR shall be responsible for preserving the Plans and Specifications, timely and accurately updated, for reference and review by the OWNER or the ENGINEER and submittal of redlines during closeout. 3.03 PRELIMINARY APPROVAL. The ENGINEER shall not have the power to waive the obligations imposed under this Contract for the furnishing by the CONTRACTOR of new material of good quality, and for good and workmanlike performance of the Work as herein described, and in full accordance with the Contract Documents, without alteration, deletion or change. No failure or omission of the OWNER'S representative to discover, object to or condemn any non-conforming or defective work or material, or to stop work, shall release the CONTRACTOR from the obligation to fully and properly perform the Contract, including without limitation, the obligation to at once remove and properly replace any defective work or material at any time prior to final acceptance, upon discovery of such non-conforming or defective work or material. Any questioned Work may be ordered taken up or removed for inspection by the ENGINEER prior to final acceptance, and if found not to be in accordance with the Contract Documents, all expense of removing, inspection and repair or replacement shall be borne by the CONTRACTOR; otherwise the expense thus incurred shall be allowed as Extra Work and shall be paid for by the OWNER, provided that where inspection or approval is specifically required by the Specifications prior to performance of certain work, should the CONTRACTOR proceed with such work without risik requesting prior inspection or approval, he shall bear all expense of taking up, removing and replacing this work if so directed by the ENGINEER. 10-1012 00700-6 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 3.04 INSPECTION BY ENGINEER. The ENGINEER will make periodic visits to the site to observe the progress and quality of the executed Work and to determine if such Work generally meets the essential performance and design features and the technical, functional /or engineering requirements of the Contract Documents, and is in all other respects being performed in compliance with the Contract Documents. However, the ENGINEER shall not be responsible for making any detailed, exhaustive, comprehensive or continuous on-site inspections to check the quality and/or quantity of the work, nor shall the ENGINEER be in any way responsible, directly or indirectly, for the construction means, methods, techniques, sequences, quality, procedures, programs, safety precautions or lack of same incident to the Work being performed or any part thereof. The ENGINEER shall use reasonable care to prevent deviation from the intent and substance of the Contract Documents by the CONTRACTOR in the performance of the Work and any part thereof and, on the basis of such on-site observations, will keep the OWNER informed of the progress of the work and will endeavor to guard the OWNER against defects and deficiencies in the Work of the CONTRACTOR. Notwithstanding any other provision of this Agreement or any other Contract Document, the ENGINEER shall not be in any way responsible or liable for any acts, errors, omissions or negligence of the CONTRACTOR, any subcontractors, agents, servants or employees or any other person, firm or corporation performing or attempting to perform any of the Work. 3.05 DETERMINATION OF QUESTIONS AND DISPUTES. In order to prevent delays and disputes and to discourage litigation, it is agreed that the ENGINEER shall, in all cases, determine the quantities and qualities of the several kinds of Work, which are to be paid for under this Contract. The ENGINEER shall address all questions in relation to said Work and the construction thereof, as well as all claims, disputes and other matters in question between the CONTRACTOR and the OWNER relating to the execution or progress of the Work or the interpretation of the Contract Documents. In the event the ENGINEER shall become aware of or shall receive information that there is a dispute or a possible dispute as to the reasonable interpretation of the terms and conditions of the Contract Documents, or any other dispute or question, the ENGINEER shall, within a reasonable time, provide a written interpretation of the Contract Documents or a written decision on all questions arising relative to the execution of the Work, copies of which shall be delivered to all parties to the Contract. If the CONTRACTOR or OWNER desires to take exception to any directions, order, interpretation or instructions of the ENGINEER, CONTRACTOR or OWNER shall present any such claim to the ENGINEER in accordance with the provisions of Section 7.04. 3.06 RECOMMENDATION OF PAYMENT. The ENGINEER shall review the CONTRACTOR's application for payment and supporting documents, shall determine the amount owed to the CONTRACTOR and shall provide written recommendation to the OWNER for payment to the CONTRACTOR in such amount. Such recommendation of payment to CONTRACTOR shall constitute a representation to the OWNER of the ENGINEER's judgment that the work has progressed to the point indicated, to the best of his knowledge, information and belief; however, such recommendation of an application for payment to CONTRACTOR shall not be deemed an acceptance of any defective or non-conforming Work. Any recommendation of payment by the ENGINEER shall be subject to OWNER's rights to withhold payment under Section 6.11 and as otherwise provided in the Contract. 10-1012 00700-7 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.0 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR 4.01 INDEPENDENT CONTRACTOR. CONTRACTOR is, and shall remain, an independent contractor, solely responsible for the manner and method of completing the Work under this Contract, with full and exclusive power and authority to direct, supervise and control his own employees and to determine the means, method and manner of performing such Work, so long as such methods comply with the requirements of the Contract Documents, and do not adversely affect the completed improvements or any other property abutting or adjoining the Work area, the OWNER and ENGINEER being interested only in the result obtained and conformity of such completed improvements to the Plans, Specifications and Contract Documents. The fact that the OWNER or ENGINEER as the Owner's representative shall have the right to observe CONTRACTOR's work during his performance and to carry out the other prerogatives which are expressly reserved to and vested in the OWNER and the ENGINEER hereunder, is not intended to and shall not at any time change or affect the status of the CONTRACTOR as an independent contractor with respect to either the OWNER or the ENGINEER as the OWNER's representative or to the CONTRACTOR's own employees or to any other person, firm or corporation. 4.02 CONTRACTOR'S UNDERSTANDING. It is understood and agreed that the CONTRACTOR has, by careful examination, satisfied himself as to the nature and location of the Work, the conformation of the ground, the character, quality and quantity of the materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the Work, the general and local conditions, including but not limited to weather, access, lay down and storage areas, and all other matters which in any way affect the Work under this Contract. It is further understood that the CONTRACTOR has satisfied himself as to the (vilmaN' terms, meaning, intent and requirements of all of the Contract Documents, and applicable laws, codes, regulations and ordinances. CONTRACTOR hereby warrants and represents that it has taken into consideration all of the foregoing factors, and CONTRACTOR shall perform the Work for the Contract Price and within the Contract Time. No verbal agreement or conversation with any officer, agent or employee of the OWNER or the ENGINEER, either before or after the execution of this Contract, shall affect or modify any of the terms or obligations herein contained. 4.03 LAWS AND ORDINANCES. The CONTRACTOR shall at all times observe and comply with all federal, state or local laws, codes, ordinances, permits and regulations, regardless of whether the same are adopted before or after the execution of this Contract, which in any manner affect the Contract or the work, and shall indemnify, save and hold harmless the OWNER and the ENGINEER against any claim arising out of the violation of any such laws, ordinances and regulations, whether by the CONTRACTOR or his agents, employees, subcontractors or vendors. If the CONTRACTOR observes that the Plans and Specifications are at variance with federal or state laws or codes or the ordinances or regulations of the City, he shall promptly notify the ENGINEER in writing, and any necessary changes shall be made as provided in the Contract for changes in the work. If the CONTRACTOR performs any work knowing it to be contrary to such laws, codes, ordinances, rules or regulations, or if CONTRACTOR reasonably should have known of any such violation, and without such notice to the ENGINEER, CONTRACTOR shall bear all costs arising therefrom. The OWNER is a Political Subdivision of the State of Texas, and the law from which it derives its powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions under which the OWNER may enter into contracts, shall be controlling and shall be considered as part of this Contract to the same effect as though embodied herein. Neither the act 10-1012 00700-8 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT of OWNER entering into this Contract, nor OWNER's performance hereunder, shall constitute a waiver of any immunity from suit enjoyed by OWNER under applicable law, all such rights and defenses being hereby expressly reserved, notwithstanding any term or provision herein to the contrary. The Code of Ordinances and other applicable regulations of the OWNER shall be deemed to be embodied in this Contract. The prevailing wage rates applicable to this Project shall be either Document 00811 —Wage Scale for Engineering Construction, or Document 00813—Wage Scale for Building Construction, or both, as set out in the Project Manual. 4.04 ASSIGNMENT AND SUBLETTING. The CONTRACTOR further agrees that he will retain personal control and will give his personal attention to the fulfillment of this Contract and that he will not assign, by power of attorney or otherwise, or sublet said Contract, or any rights, duties or obligations arising thereunder, in whole or in part, without the prior written consent of the OWNER, and that no part or feature of the Work will be sublet to anyone objectionable to the ENGINEER or the OWNER. In addition, the OWNER reserves the right to disapprove the subletting of this Contract or any portion hereof on any basis whatsoever. The CONTRACTOR further agrees that the subletting of any portion or feature of the Work or materials required in the performance of this Contract shall not relieve the CONTRACTOR from his obligations to the OWNER,as provided for by this Agreement. 4.05 PERFORMANCE,PAYMENT AND MAINTENANCE BONDS. In the event the Contract Price shall be in excess of $25,000.00, the CONTRACTOR shall execute separate Performance,Payment and Maintenance Bonds, each in the sum of one hundred percent(100%) of the Contract Price, and each in accordance with the provisions of Chapter 2253 of the Texas Government Code. If the Contract Price does not exceed $25,000.00, the statutory bonds will not be required. All required Bonds shall be payable to OWNER and on forms approved by the OWNER, and shall be executed by a corporate surety in accordance with Article 7.19-1 of the Texas Insurance Code. It is agreed that the Contract shall not be in effect until such original Performance, Payment and Maintenance Bonds are delivered to and approved by the OWNER. The cost of the premium for the Performance, Payment and Maintenance Bonds, should Maintenance Bonds be required, shall be included in the CONTRACTOR's Bid Proposal. All bonds shall be issued by Texas Department of Insurance approved surety companies. 4.06 INSURANCE. The CONTRACTOR, at his own expense, shall procure, maintain and keep in force throughout the duration of the Work, and throughout the Guarantee Period, insurance as specified in Attachment No. 1 hereto with regard to Workers' Compensation Insurance, and as specified in Attachment No. 3 hereto with regard to all other Insurance. Such insurance shall be carried with an insurance company licensed to transact business in the State of Texas and shall cover all operations in connection with this Contract, whether performed by the CONTRACTOR or a subcontractor, or others for whom CONTRACTOR is responsible. 4.07 PERMITS AND FEES. Unless otherwise provided in the Contract Documents,the Contractor shall secure and pay for all permits, licenses, and inspections necessary for proper execution and completion of the Work, and which are legally required at the time bids are received. Permits required by the City of Pearland will be issued as a NO FEE permit. 4.08 TEXAS STATE SALES TAX. Materials incorporated into this project are exempt from State Sales according to provisions of the Texas Tax Code, Chapter 151, Subsection H. 10-1012 00700-9 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (.1"`. The Contractor must obtain a limited sales, excise and use tax permit or exemption certificate which shall enable him to buy the materials to be incorporated into the Work without paying tax at due time of purchase. 4.09 CONTRACTOR'S DUTY AND SUPERINTENDENCE. The CONTRACTOR shall give adequate attention to the faithful prosecution and completion of this Contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to the ENGINEER as the OWNER'S representative. The superintendent shall represent the CONTRACTOR in his absence and shall act as the agent of the CONTRACTOR, and all directions given to him shall be binding as if given to the CONTRACTOR. Adequate supervision by competent and reasonable representatives of the CONTRACTOR is essential to the proper performance of the Work, and lack of such supervision shall be an act of default, and grounds for suspending operations of the CONTRACTOR. The Superintendent cannot be removed from the project without the consent of the Owner; the Superintendent must speak and understand the English language; the Superintendent must be on site when any work on the project is being done, even when a subcontractor is performing the work. The Work, from its commencement to completion, shall be under the exclusive charge and control of the CONTRACTOR, and all risk in connection therewith shall be borne by the CONTRACTOR. Neither the OWNER nor the ENGINEER as the OWNER's representative will be responsible for the acts or omissions of the CONTRACTOR, its subcontractors or any of its agents or employees, or any other persons performing any of the Work. 4.10 CHARACTER OF WORKERS. The CONTRACTOR agrees to employ only orderly and competent workers, skillful in the performance of the type of work required under this Contract, to do the Work, and agrees that whenever the ENGINEER shall inform him in writing that any worker or workers on the Work are, in his opinion, incompetent,unfaithful or disorderly, or in the ENGINEER's opinion, are not using their best efforts for the progress of the Work, such worker or workers shall be discharged from the Work and shall not again be employed on the Work without the ENGINEER's written consent. OWNER reserves the right to bar any person, subcontractor, or supplier found to be incompetent, unfaithful, disorderly, or not using their best efforts to progress work or considered to be a threat to the health, safety and welfare to the project or workforce. 4.11 LABOR, EQUIPMENT, MATERIALS, CONSTRUCTION PLANT, AND BUILDINGS. The CONTRACTOR shall provide all labor, services, tools, equipment, machinery, supplies, facilities, utilities and materials necessary in the prosecution and completion of this Contract where it is not otherwise specifically provided that the OWNER shall furnish same; and further, the CONTRACTOR shall be responsible for the care, preservation, conservation and protection of all materials, supplies,machinery, equipment, tools, apparatus, accessories, facilities, all means of construction and any and all parts of the Work, whether the CONTRACTOR has been paid, partially paid or not paid for such Work, until the entire Work is completed and accepted. The building or placement of structures for housing workers or offices, or the erection of tents or other forms of protection, will be permitted only with the ENGINEER's written permission, and at 10-1012 00700- 10 of 36 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT such places as the ENGINEER shall direct, and the sanitary conditions of the grounds in or about such structures shall at all times be maintained in a manner satisfactory to the ENGINEER. Any structures of any nature constructed, placed or erected by the CONTRACTOR for the purposes herein set out, shall be the sole responsibility of the CONTRACTOR as to the proper erection, placement or construction thereof; and the CONTRACTOR agrees to indemnify and hold the ENGINEER or OWNER harmless from any claims of any nature whatsoever brought against either of them for damages allegedly sustained by anyone by reason of the erection, placement, construction or maintenance of CONTRACTOR's buildings or structures. 4.12 SANITATION. Necessary sanitary conveniences for the use of laborers and others on the Work site, properly secluded from public observation, shall be constructed and maintained by the CONTRACTOR in such manner and at such points as shall be approved by the ENGINEER, and their use shall be strictly enforced. Any structures of any nature constructed or erected by the CONTRACTOR for the purposes herein set out, shall be the sole responsibility of the CONTRACTOR as to the proper erection or construction thereof, and the CONTRACTOR agrees to indemnify and hold the ENGINEER and OWNER harmless from any claims of any nature whatsoever brought against either of them for damages allegedly sustained by anyone by reason of the erection, construction or maintenance of CONTRACTOR's buildings. 4.13 CLEANING AND MAINTENANCE. The CONTRACTOR shall at all times keep and maintain the premises free from accumulation of debris, trash and waste. The CONTRACTOR shall remove waste, debris and trash at the end of each work day. CONTRACTOR shall remove all such debris, trash and waste, tools, scaffolding and surplus materials, and shall leave the Work broom-clean or its equivalent, upon completion of the Work. The Work shall be left in good order and condition. In case of dispute, the OWNER may remove the debris, trash,waste and surplus materials, and charge the cost to the CONTRACTOR. 4.14 PERFORMANCE OF WORK. It is further agreed that it is the intent of this Contract that all Work must be done and all material must be furnished in accordance with the generally accepted practice for such materials furnished or work completed, unless otherwise provided in the Contract Documents. 4.15 RIGHT OF OWNER TO ACCELERATE THE WORK. If at any time the methods or equipment used by the CONTRACTOR, or the work force supplied are found to be inadequate to achieve the progress required to Substantially Complete the Work within the Contract Time, the OWNER or the ENGINEER as the OWNER's representative, may order the CONTRACTOR in writing to supplement its forces and/or equipment, or work shifts or overtime, or otherwise improve its efficiency and rate of progress to achieve Substantial Completion of the Work within the Contract Time, and the CONTRACTOR shall comply with such order, at its own cost and expense. 4.16 LAYOUT OF WORK. Except as specifically provided herein, the CONTRACTOR shall be responsible for laying out work by means of construction surveying and shall accomplish this work in a manner acceptable to the ENGINEER and in conformance with the Contract Documents. 4.17 SHOP DRAWINGS. The CONTRACTOR shall submit to the ENGINEER, with such promptness as to cause no delay in his own Work or in that of any other contractor, six (6) checked copies, unless otherwise specified, of all shop and/or setting drawings and schedules 10-1012 00700- 11 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (#"*\, required for the work of the various trades. Contractor will check and approve shop drawings for compliance with requirements of Contract Documents and will so certify by stamp on each drawing prior to submittal to ENGINEER. Any drawings submitted without Contractor's stamp of approval will not be considered and will be returned to him for proper submission. The ENGINEER shall pass upon them with reasonable promptness, indicating desired corrections. The CONTRACTOR shall make any corrections required by the ENGINEER, file with him two (2) corrected copies and furnish such other copies as may be needed. The ENGINEER's approval of such drawings or schedules shall not relieve the CONTRACTOR from responsibility for deviations from the Contract Documents, unless he has, in writing, called the ENGINEER's attention to such deviations at the time of the submission, and the ENGINEER has acknowledged and accepted such deviations in writing, nor shall it relieve him from responsibility for errors of any sort in shop drawings or schedules. It shall be the CONTRACTOR's responsibility to fully and completely review all shop drawings to ascertain their effect on his ability to perform the required Contract Work in accordance with the Contract Documents, and within the Contract Time. Such review by the ENGINEER shall be for the sole purpose of determining the apparent sufficiency of said drawings or schedules to result in finished improvements in conformity with the Contract Documents, and shall not relieve the CONTRACTOR of his duty as an independent contractor as previously set forth, it being expressly understood and agreed that the ENGINEER does not assume any duty to pass upon the propriety or adequacy of such drawings or schedules, or any means or methods reflected thereby, in relation to the safety of either person or property during CONTRACTOR's performance hereunder, and any action taken by the ENGINEER shall not relieve the CONTRACTOR of his responsibility and liability to comply with the Contract Documents. OWNER, CONSTRUCTION MANAGER, ENGINEER, and CONTRACTOR shall make all submittals, review comments, notes, corrections, schedules and updates, testing results, payment applications, instructions and other communications by means of the OWNER'S Pro-Trak. The OWNER,ENGINEER and CONTRACTOR shall each retain such hard copies form this system as are required for their specific record keeping requirements. No documents shall be removed from this system or destroyed except those being replaced by the systems protocols as a latest version document. All requirements for written communications, submittals, comments, instructions or other documents processed by means of this system shall have the same legal or time sensitive status as if they had been hand delivered in hard copy to their intended addressee. 4.18 ENGINEER-CONTRACTOR RELATIONSHIP; OBSERVATIONS. It is agreed by the CONTRACTOR that the ENGINEER, as the OWNER's representative, shall be and is hereby authorized to appoint such subordinate engineers, representatives or observers as the said ENGINEER may from time to time deem proper to observe the materials furnished and the Work done under this Agreement. The CONTRACTOR shall furnish all reasonable aid and assistance required by the subordinate engineers, representatives or observers for the proper observation and examination of the work. The CONTRACTOR shall regard and obey the directions and instructions of any subordinate engineers, representatives or observers so appointed, when such directions and instructions are consistent with the obligations of this Agreement and the Contract Documents, provided, however, should the CONTRACTOR object to any orders by any 10-1012 00700- 12 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT subordinate engineer, representative or observer, the CONTRACTOR may, within three (3) days, make written appeal to the ENGINEER for his decision. 4.19 OBSERVATION AND TESTING. The OWNER or the ENGINEER as the OWNER's representative shall have the right at all reasonable times to observe, inspect and test the Work. The CONTRACTOR shall make all necessary arrangements and provide proper facilities and access for such observation, inspection and testing at any location wherever Work is in preparation or progress. The CONTRACTOR shall ascertain the scope of any observation, inspection or testing which may be contemplated by the OWNER or the ENGINEER and shall give ample notice as to the time each part of the Work will be ready for such observation, inspection or testing. The OWNER or the ENGINEER may reject any Work found to be defective or not in accordance with the Contract Documents, regardless of the stage of its completion or the time or place of discovery of such deficiencies, and regardless of whether the ENGINEER has previously accepted the Work through oversight or otherwise. If any Work is covered without approval or consent of the OWNER, it must, if requested by the OWNER or the ENGINEER, be uncovered for examination, at the sole expense of the CONTRACTOR. In the event that any part of the Work is being fabricated or manufactured at a location where it is not convenient for the OWNER or the ENGINEER to make observations of such Work or require testing of said Work, then in such event, the OWNER or the ENGINEER may require the CONTRACTOR to furnish the OWNER or the ENGINEER with certificates of inspection, testing or approval made by independent persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the Contract Documents. If any Work, which is required to be inspected, tested or approved, is covered up without written approval or consent of the OWNER or the ENGINEER, it must, if requested by the OWNER or the ENGINEER, be uncovered for observation and testing, at the sole expense of the CONTRACTOR. The cost of all such inspections, tests and approvals shall be borne by the CONTRACTOR unless otherwise provided herein. Any Work which fails to meet the requirements of such tests, inspections or approval, and any Work which meets the requirements of any such tests or approval but does not meet the requirements of the Contract Documents shall be considered defective. Such defective Work and any other work affected thereby shall be corrected at the CONTRACTOR'S expense. Neither observations by the OWNER or by the ENGINEER, nor inspections, certifications, tests or approvals made by the OWNER, the ENGINEER or other persons authorized under this Agreement to make such inspections, tests or approvals, shall relieve the CONTRACTOR from his obligation to perform the Work in accordance with the requirements of the Contract Documents. 4.20 DEFECTS AND THEIR REMEDIES. It is further agreed that if the Work or any part thereof or any material brought on the site of the Work for use in the Work or selected for the same, shall be deemed by the ENGINEER as unsuitable or not in conformity with the Contract Documents, the CONTRACTOR shall, after receipt of written notice thereof from the ENGINEER, forthwith remove such material and rebuild or otherwise remedy such Work so that it shall be in full accordance with this Contract, It is further agreed that any such remedial action contemplated herein shall be at CONTRACTOR's expense. 10-1012 00700- 13 of 36 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT (00`N. 4.21 LIABILITY FOR PROPER PERFORMANCE. Engineering construction drawings and specifications, as well as any additional instructions and information concerning the Work to be performed, passing from or through the ENGINEER, shall not be interpreted as requiring or allowing the CONTRACTOR to deviate from the Contract Documents, the intent of such drawings, specifications and any other such instructions being to define with particularity the agreement of the parties as to Work the CONTRACTOR is to perform. CONTRACTOR shall be fully and completely liable and contractually bound, at his own expense, for design, construction, installation and use or non-use of all items and methods incident to the performance of the Contract, including, without limitation, the adequacy of all temporary supports, shoring, bracing, scaffolding, machinery or equipment, safety precautions or devices, similar items or devices used by him during construction, and work performed either directly or incident to construction, and for all loss, damage or injury incident thereto, either to person or property, whether such damage be suffered by the ENGINEER, the OWNER or any other person not a party to this Contract. Any review of Work in progress or any visit or observation during construction, or any clarification of Contract Documents by the ENGINEER or OWNER, or any agent, employee or representative of either of them, whether through personal observation on the Project site or by means of approval of shop drawings for construction or construction processes, or by other means or methods, is agreed by the CONTRACTOR to be for the purpose of observing the extent and nature of Work completed or being performed, as measured against the Contract Documents, or for the purpose of enabling the CONTRACTOR to more fully understand the Contract Documents so that the completed construction Work will conform thereto, and shall in no way relieve the CONTRACTOR from full and complete responsibility for proper performance of his Work on the 7b.\ Project, including, without limitation, the propriety of means and methods of the CONTRACTOR in performing said Contract, and the adequacy of any designs, plans or other facilities for accomplishing such performance. Any action by the ENGINEER or the OWNER in visiting or observing during construction, or any clarification of Contract Documents shall not constitute a waiver of CONTRACTOR'S liability for damages as herein set out. Deviation by the CONTRACTOR from Contract Documents, whether called to the CONTRACTOR's attention or not, shall in no way relieve CONTRACTOR from his responsibility to complete all work in accordance with said Contract Documents, and further shall not relieve CONTRACTOR of his liability for loss, damage or injury as herein set out. 4.22 PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC. The CONTRACTOR shall be solely responsible for the safety of himself, his employees and persons entering the project site, as well as for the protection of the improvements being erected and the property of himself or any other person, as a result of his operations hereunder. The CONTRACTOR shall take out and procure a policy or policies of Workers' Compensation Insurance with an insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workers' Compensation laws of the State of Texas. The CONTRACTOR shall at all times exercise reasonable precautions for the safety of employees and others on or near the Work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded, as a minimum, in accordance with the "Manual of Accident Prevention in Construction" of the Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The CONTRACTOR shall provide all necessary machinery guards, safe walkways, ladders, bridges, gangplanks, barricades, fences, traffic control,warning signs and other safety devices. 10-1012 00700- 14 of 36 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT No alcoholic beverages, non-prescription drugs, or unsafe practices shall be allowed on the Work site. CONTRACTOR shall dismiss anyone participating in any of the above from the Work site for the duration of the Project. Only prescription drug uses with a doctor's authorization to perform construction activities shall be allowed on the Work site. Violation of this provision is a default under the Contract. The use, possession, sale, transfer, purchase or being under the influence of alcohol, drugs or any other illegal or unlawful substance by CONTRACTOR or CONTRACTOR's employees, or CONTRACTOR's subcontractors and employees at any time at the Work site or while on company business is prohibited. CONTRACTOR shall institute and enforce appropriate drug testing guidelines and program. All accidents or injuries to CONTRACTOR's employees working on the job site must be reported verbally and in writing to the ENGINEER immediately, and within no more than eight(8)hours. The safety precautions actually taken and their adequacy shall be the sole responsibility of the CONTRACTOR, in his sole discretion as an independent contractor. Inclusion of this paragraph in the Agreement, as well as any notice which may be given by the OWNER or the ENGINEER as the OWNER's representative concerning omissions under thus paragraph as the Work progresses, are intended as reminders to the CONTRACTOR of his duty and shall not be construed as any assumption of duty by ENGINEER, or OWNER's representative to supervise safety precautions by either the CONTRACTOR or any of his subcontractors. 4.23 PROTECTION OF ADJOINING PROPERTY. The CONTRACTOR shall employ proper means to protect the adjacent or adjoining property or properties in any way encountered, which might be injured or seriously affected by any process of construction to be undertaken under this Agreement, from any damage or injury by reason of said process of construction; and he shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent or adjoining property. THE CONTRACTOR AGREES TO INDEMNIFY; DEFEND, SAVE AND HOLD HARMLESS THE CONSTRUCTION MANAGER, OWNER AND ENGINEER AGAINST ANY CLAIM OR CLAIMS FOR DAMAGES, LOSS, COSTS OR EXPENSES, INCLUDING BUT NOT LIMITED TO ATTORNEY'S FEES, DUE TO ANY INJURY TO ANY ADJACENT OR ADJOINING PROPERTY, ARISING OR GROWING OUT OF THE PERFORMANCE OF THE CONTRACT, REGARDLESS OF WHETHER OR NOT SUCH DAMAGE, LOSS, COST OR EXPENSE IS CAUSED IN PART BY THE NEGLIGENCE, GROSS NEGLIGENCE OR STRICT LIABILITY OF OWNER AND/OR ENGINEER. 4.24 PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS, MATERIALMEN AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES. THE CONTRACTOR AGREES THAT HE WILL PROMPTLY PAY WHEN DUE, AND WILL INDEMNIFY, SAVE AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ALL CLAIMS GROWING OUT OF THE DEMANDS OF SUBCONTRACTORS, LABORERS, WORKERS, MECHANICS, MATERIALMEN AND FURNISHERS OF MACHINERY AND PARTS THEREOF, EQUIPMENT, POWER TOOLS AND ALL SUPPLIES, INCLUDING COMMISSARY, INCURRED IN THE FURTHERANCE OF THE PERFORMANCE OF THIS CONTRACT. When so desired by the OWNER, the CONTRACTOR shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. If the CONTRACTOR fails to do so, then the OWNER may, at the option of the (ilk\ OWNER, either pay directly any unpaid bills of which the OWNER has written notice, or withhold from the CONTRACTOR's unpaid compensation a sum of money deemed reasonably 10-1012 00700-15 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT \sub\ sufficient to liquidate any and all such claims until satisfactory evidence is furnished that all liabilities have been fully discharged, whereupon payments to the CONTRACTOR shall be resumed in full, in accordance with the terms of this Contract. Any and all communications between any parties under this paragraph shall be in writing. Nothing contained in this paragraph or this Agreement shall create, establish or impose any relationship, contractual or otherwise,between OWNER and any subcontractor, laborer or supplier of CONTRACTOR, nor shall it create, establish or impose any duty upon OWNER to pay or to see to the payment of any subcontractor, laborer or supplier of CONTRACTOR. 4.25 PROTECTION AGAINST ROYALTIES OR PATENTED INVENTION. The CONTRACTOR shall pay all royalties and license fees and shall provide for the use of any design, device, material or process covered by letters patent or copyright, by suitable legal agreement with the patentee or owner thereof THE CONTRACTOR SHALL DEFEND ALL SUITS OR CLAIMS FOR INFRINGEMENT OF ANY PATENT OR COPYRIGHT AND SHALL INDEMNIFY, SAVE AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY LOSS OR LIABILITY ON ACCOUNT THEREOF, EXCEPT SUCH SUITS AND CLAIMS ARISING OUT OF A PARTICULAR DESIGN, DEVICE, MATERIAL OR PROCESS OR THE PRODUCT OF A PARTICULAR MANUFACTURER OR MANUFACTURERS SPECIFIED OR REQUIRED BY THE OWNER; PROVIDED, HOWEVER, IF CHOICE OF ALTERNATE DESIGN, DEVICE, MATERIAL OR PROCESS IS ALLOWED TO THE CONTRACTOR, OR IF CONTRACTOR KNEW OR SHOULD HAVE KNOWN OF THE PATENT OR COPYRIGHT AND FAILED TO PROMPTLY NOTIFY OWNER IN WRITING, THEN THE CONTRACTOR SHALL INDEMNIFY, DEFEND, SAVE AND HOLD THE OWNER HARMLESS FROM ANY LOSS OR LIABILITY ON ACCOUNT THEREOF. 4.26 INDEMNIFICATION. THE CONTRACTOR AGREES TO DEFEND, INDEMNIFY AND HOLD THE ENGINEER AND THE OWNER HARMLESS FROM ANY CLAIMS OR DEMANDS OF ANY NATURE WHATSOEVER MADE BY ANY EMPLOYEE, EMPLOYEES, AGENTS OR SUBCONTRACTORS OF CONTRACTOR, OR BY ANY UNION, TRADE ASSOCIATION, WORKER'S ASSOCIATION OR OTHER GROUPS, ASSOCIATIONS OR INDIVIDUALS,ALLEGEDLY REPRESENTING EMPLOYEES OF THE CONTRACTOR, IN ANY DISPUTE BETWEEN THE CONTRACTOR AND HIS EMPLOYEES, DIRECTLY OR INDIRECTLY INVOLVING, GROWING OUT OF OR ARISING FROM CLAIMS BY SUCH EMPLOYEES FOR WAGES, SALARY, COMPENSATION, BENEFITS, WORKING CONDITIONS OR ANY OTHER. SIMILAR COMPLAINT OR CLAIM WHICH MAY BE MADE. THE CONTRACTOR, HIS SURETIES AND INSURANCE CARRIERS SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS THE OWNER AND THE ENGINEER AND THEIR RESPECTIVE OFFICERS, REPRESENTATIVES, AGENTS AND EMPLOYEES FROM AND AGAINST ALL DAMAGES, CLAIMS, LOSSES, DEMANDS, SUITS, LIABILITIES, JUDGMENTS AND COSTS OF ANY CHARACTER WHATSOEVER, INCLUDING REASONABLE ATTORNEY'S FEES AND EXPENSES, AND SHALL BE REQUIRED TO PAY ANY JUDGMENT THEREFOR, WITH COSTS, WHICH MAY BE OBTAINED , AGAINST THE OWNER AND/OR THE ENGINEER OR ANY OF THEIR OFFICERS, REPRESENTATIVES, AGENTS OR EMPLOYEES, ARISING OUT OF OR RESULTING FROM OR ALLEGEDLY ARISING OUT OF OR RESULTING FROM THE PERFORMANCE 10-1012 00700- 16 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (4.1*\' OF THE WORK, PROVIDED THAT ANY SUCH DAMAGES, CLAIM, LOSS, DEMAND, SUIT, LIABILITY,JUDGMENT,COST OR EXPENSE: (A) ARISES OUT OF OR RESULTS FROM IN WHOLE OR IN PART, OR ALLEGEDLY ARISES OUT OF OR RESULTS FROM IN WHOLE OR IN PART, ANY BREACH OF THIS AGREEMENT OR BREACH OF WARRANTY BY CONTRACTOR; OR (B) IS ATTRIBUTABLE TO BODILY INJURY, SICKNESS, DISEASE OR DEATH OR INJURY TO OR DESTRUCTION OF TANGIBLE PROPERTY, INCLUDING THE LOSS OF USE RESULTING THEREFROM; AND IS CAUSED IN WHOLE OR IN PART OR IS ALLEGEDLY CAUSED IN WHOLE OR IN PART BY ANY NEGLIGENT ACT OR OMISSION OF THE CONTRACTOR, ANY SUBCONTRACTOR, THEIR AGENTS OR EMPLOYEES OR ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY ANY ONE OF THEM OR ANYONE FOR WHOSE ACTS ANY OF THEM MAY BE LIABLE, REGARDLESS OF WHETHER OR NOT IT IS CAUSED IN PART OR ALLEGEDLY CAUSED IN PART BY THE NEGLIGENCE, GROSS NEGLIGENCE OR STRICT LIABILITY OF OWNER, ENGINEER AND/OR A PARTY INDEMNIFIED HEREUNDER. ('° \ Notwithstanding the foregoing or anything in the Agreement to the contrary, in accordance with the provisions of Section 130.002 of the Texas Civil Practice and Remedies Code, CONTRACTOR shall not be obligated to indemnify or hold harmless the ENGINEER,his agents, servants or employees, from liability for damage that is caused by or results from defects in plans, designs or specifications prepared, approved or used by the ENGINEER, or negligence of the ENGINEER in the rendition or conduct of professional duties called for or arising out of any construction contract and the plans, designs or specifications that are a part of the construction contract, and arises from personal injury or death, property injury, or any other expense that arises from personal injury, death, or property injury. This indemnity agreement is a continuing obligation, and shall survive notwithstanding completion of the Work, Final Payment, expiration of the warranty period, termination of the Contract, and abandonment or takeover of the Work. CONTRACTOR's indemnification obligations hereunder shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the CONTRACTOR or a subcontractor under workers' compensation acts, disability benefit acts or other employee benefit acts, and shall not be limited by any limitation on amounts or coverage of insurance provided or to be provided under this Contract. 4.27 LOSSES FROM NATURAL CAUSES. All loss, cost, expense or damage to the CONTRACTOR arising out of the nature of the Work to be done or from any unforeseen circumstances in the prosecution of the same, or from the action of the elements, or from unusual obstructions or difficulties which may be encountered in the prosecution of the Work, shall be sustained and borne by the CONTRACTOR at his own cost and expense. 10-1012 00700- 17 of 36 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT 4.28 GUARANTEE. The CONTRACTOR hereby guarantees all the Work under the Contract to be free from defects or deficiencies in material in every particular and free from defects or deficiencies in workmanship; and against unusual damage from proper and usual use; and agrees to replace or to re-execute without cost to the OWNER such Work as may be found to be defective, deficient or otherwise not in conformance with the Contract Documents, and to make good all damages caused to other work or material, due to such defective Work or due to its required replacement or re-execution. This guarantee shall cover a period of one year from the date of Substantial Completion or Partial Substantial Completion of Work under the Contract, as evidenced by the Certificate of Substantial Completion. Neither the Certificate of Substantial Completion, Final Payment, nor any provision in the Contract Documents shall relieve the CONTRACTOR of the responsibility for defective, deficient or non-conforming material or workmanship during the period covered by the guarantee. The one-year period of guarantee will not limit the OWNER'S other rights under common law with respect to any defects, deficiencies or non-conforming Work discovered after one year. If this one-year guarantee conflicts with other warranties or guarantees, the longer period of warranty or guarantee will govern. 5.0 PROSECUTION AND PROGRESS 5.01 TIME AND ORDER OF COMPLETION. It is the meaning and intent of this Contract, unless otherwise herein specifically provided, that the CONTRACTOR shall be allowed to prosecute his Work at such times and seasons, in such order of precedence, and in such manner as shall be most conducive to economy of construction; provided, however, that the order and the time of prosecution shall be such that the Work shall be Substantially Completed as a whole and in part, in accordance with this Contract and the Contract Time; provided, also, that when the OWNER is having other work done, either by contract or by his own forces, the ENGINEER may direct the time and manner of constructing the Work done under this Contract, so that conflict will be avoided and the construction of the various works being done for the OWNER shall be harmonized, and the CONTRACTOR shall fully cooperate and coordinate its Work with OWNER or such other contractors. The CONTRACTOR shall submit, an updated schedule with every pay estimate for review by the ENGINEER, schedules which shall show the order in which the CONTRACTOR proposes to carry on the Work, with dates on which the CONTRACTOR will start the several parts of the work, and estimated dates of completion of the several parts. Such schedules shall show completion of the Work within the Contract Time, and/or shall show such recovery efforts as CONTRACTOR intends to undertake in the event Substantial Completion of the Work is delayed. 5.02 EXTENSION OF TIME. The CONTRACTOR agrees that he has submitted his Bid Proposal in full recognition of the time required for the completion of this Project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions as hereinafter set forth, and that he shall not be entitled to, nor will he request, an extension of time on this Contract, except when Substantial Completion of the Work has been delayed solely by strikes, lockouts, fires, Acts of God, or by any other cause which the ENGINEER shall decide justifies the delay. The CONTRACTOR shall give the ENGINEER prompt notice, in writing and within three (3) days of the start of any such delay, of the cause of any such delay, and its estimated effect on the Work and the schedule for completion of the Work. Upon receipt of a written request for an extension of the Contract Time from the CONTRACTOR, supported by relevant and all requested documentation, the 10-1012 00700- 18 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ENGINEER shall submit such written request, together with his written recommendation, to the OWNER for consideration. If the delay is not attributable in whole or in part to any act or omission of CONTRACTOR, its subcontractors or suppliers, and if the OWNER determines that CONTRACTOR is entitled to an extension of time under the terms of the Contract, the OWNER shall grant an extension of time for Substantial Completion of the Work, sufficient to compensate for the delay, and such extension of time shall be CONTRACTOR's sole and exclusive remedy, except as may be otherwise provided herein. No extensions of Contract Time shall be made for delays occurring prior to the Contractor's mobilization as defined in Section 01505 MOBILIZATION. The Contract Time as defined in the Bid Proposal and other sections herein incorporates 40 Rain Days per calendar year or an average of 3.33 days per calendar month. The CONTRACTOR is required to keep record of all weather related delays and to submit the monthly count on each Pay Application. The Owner's Representative shall review and sign off on this record as a part of the Pay Application approval process every month. If, during preparation of the Balancing Change Order, the status of the work progress requires an extension of the Contract Time, Impact Days shall be added to the Completion Date equal to the total number of Weather or Impact Days approved less the original 40 days resident in the original Contract Time. The Addition of Weather or Impact Days will only alter the Contract Time when added by Change Order. If the Work is completed prior to the Completion Date, No Days will be added. The addition of Weather or Impact Days shall be the CONTRACTOR"s sole remedy for delays to the completion of the Work and their addition to the Contract Time shall not affect the Contract Price through any"per diem" adjustment to the General Conditions costs, Temporary Facilities costs or any other costs associated with the extension of the Contract Time. Clieb\ 5.03 HINDRANCES AND DELAYS. In executing the Contract, the CONTRACTOR agrees that in undertaking to complete the Work within the time herein fixed, he has taken into consideration and made allowances for all interference, disruption, hindrances and delays incident to such Work, whether growing out of delays in securing material, workmen or otherwise. No claim shall be made by the CONTRACTOR for damages, loss, costs or expense resulting from interference, disruption, hindrances or delays from any cause during the progress of any portion of the Work embraced in this Contract, except where the Work is stopped or suspended by order of the OWNER"s representative and such stoppage or suspension is not attributable to any act or omission of CONTRACTOR. 5.04 SUSPENSION OF WORK. OWNER may, without cause, order the CONTRACTOR in writing to suspend the Work, in whole or in part, for such period of time as OWNER may request. The Contract Price and/or Contract Time shall be adjusted for any increase in the cost of or the time required for performance of the Work caused by such suspension. No adjustment shall be made to the extent performance was or would have been suspended by a cause for which CONTRACTOR is responsible, or to the extent an adjustment is made or denied under another provision of the Contract Documents. 5.05 LIQUIDATED DAMAGES FOR DELAY: It is understood and agreed that time is of the essence, and that the CONTRACTOR will commence the Work on the date specified herein or in any Notice to Proceed, and will Substantially Complete the Work within the Contract Time. It is expressly understood and agreed, by and between the CONTRACTOR and the OWNER, that the time for the Substantial Completion of the Work described herein is reasonable time for the completion of the same, taking into consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality. The CONTRACTOR further 10-1012 00700- 19 of 36 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT agrees that a failure to complete on time will cause damage to the OWNER and that such damages cannot be accurately measured or that ascertainment will be difficult. Therefore, the parties agree that for each and every calendar day the Work or any portion thereof shall remain uncompleted after the expiration of the Contract Time, the CONTRACTOR shall pay, as liquidated damages and as a reasonable estimate of OWNER's damages, and not as a penalty,the amount set out in.the Standard Form of Agreement. However, the foregoing agreement as to liquidated damages constitutes only an agreement by the OWNER and the CONTRACTOR as to the amount of damages which the OWNER will sustain by reason of the CONTRACTOR'S failure to complete the work within the Contract Time. Should the OWNER suffer damage by reason of any other breach by CONTRACTOR, the OWNER may recover such actual damages in addition to any liquidated damages due. The OWNER shall have the right to deduct and withhold the amount of any and all such damages whether it be the minimum amount stipulated above or otherwise, from any monies owing by it to said CONTRACTOR, or the OWNER may recover such amount from the CONTRACTOR and the sureties of his bond; all of such remedies shall be cumulative and the OWNER shall not be required to elect any one nor be deemed to have made an election by proceeding to enforce any one remedy. 5.06 CHANGE OF CONTRACT TIME: The Contract Time may only be changed by a Change Order. Any claim for an adjustment of Contract Time shall be based on written notice delivered by the party making such claim to the other party and to the ENGINEER promptly, but in no event later than ten(10) days after the event-giving rise to the claim. Notice of the extent of the claim, along with supporting data, shall be delivered within thirty (30) days of the occurrence and shall be accompanied by the claimant's written representation that the adjustment claimed is the entire adjustment to which the claimant has reason to believe it is entitled as a result of the occurrence of said event. All claims for adjustment in Contract Time shall be determined by the ENGINEER in accordance with the requirements of this paragraph. Contractor shall submit, as a minimum,the following data: A. Information showing that the time requested is not included in the existing Contract and in addition to the Contract. B. Information documenting that the number of days requested is accurate for the event. C. Revised, current construction schedule showing that the time requested affects the project's critical path. 5.07 DELAYS BEYOND OWNER'S AND CONTRACTOR'S CONTROL: Where CONTRACTOR is prevented from completing any part of the Work within the Contract Time due to delays beyond the control of the OWNER and the CONTRACTOR, including, but not limited to, interference by utility owners or other contractors performing other work, Contractor shall be entitled to an extension of the Contract Time in an amount equal to the time lost. CONTRACTOR shall not be entitled to any increase in Contract Price as a result of such delays. IN NO EVENT SHALL OWNER BE LIABLE TO CONTRACTOR FOR DAMAGES ARISING OUT OF OR RESULTING FROM (i) Delays caused by, or within the control of, the CONTRACTOR, or (ii) Delays beyond the control of both parties including, but not limited to, interference by utility owners or other contractors performing other work, fires, floods, epidemics, abnormal weather (111 conditions, acts of God, even if such delays are due in part to the negligence, other fault,breach of contract or warranty, violation of the Texas Deceptive Trade Act, or strict liability without regard 10-1012 00700-20 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT to fault of OWNER. An extension of Contract time shall be CONTRACTOR's sole and exclusive remedy for any such delays. Delays attributed to, and within the control of, a Subcontractor or Supplier shall be deemed to be delays within the control of the CONTRACTOR. 6.0 MEASUREMENT AND PAYMENT 6.01 DISCREPANCIES AND OMISSIONS. If the CONTRACTOR knows or reasonably should have known of any discrepancies or omissions in the Contract Documents, he shall notify the ENGINEER and obtain a clarification by Addendum before the bids are received, and if no such request is received by the ENGINEER prior to the opening of bids, then it shall be considered that the CONTRACTOR fully understands the Work to be performed and has provided sufficient sums in his Bid Proposal to complete the Work in accordance with the Contract Documents. It is further understood that any request for clarification must be submitted no later than five(5) days prior to the opening of bids. 6.02 QUANTITIES AND MEASUREMENTS. No extra or customary measurements of any kind will be allowed, but the actual measured and/or computed length, area, volume, number and weight only shall be considered,unless otherwise specifically provided. 6.03 ESTIMATED QUANTITIES. This Agreement, including the Contract Cmb Documents, and including any estimates contained therein, is intended to convey all Work to be done and material to be furnished hereunder. Where the estimated quantities are shown for the various classes of Work to be done and material to be furnished under this Contract, they are approximate and are to be used only as a basis for estimating the probable cost of the Work and for comparing the Bid Proposals offered for the Work. It is understood and agreed that the actual amount of Work to be done and the materials to be furnished under this Contract may differ from the estimates and that the items listed or estimated quantities stated, and/or any difference between estimated and actual Work, shall not give rise to a claim by the CONTRACTOR against the OWNER for loss, cost, expense, damages,unit price adjustment, quantity differences,unrecovered overhead or lost or anticipated profits, or other compensation. 6.04 PRICE OF WORK. It is agreed that it is the intent of this Contract that all Work described in the Bid Proposal, and Contract Documents, is to be done for the prices bid by the CONTRACTOR and that such prices shall include all appurtenances necessary to complete the Work in accordance with the intent of these Contract Documents as interpreted by the ENGINEER, and all costs, expenses, bond and insurance premiums, taxes, overhead, and profit. In consideration of the furnishing of all the necessary labor, equipment and material and the completion of all Work by the CONTRACTOR, and upon the completion of all Work and the delivery of all materials embraced in this Contract in full conformity with the Contract Documents, the OWNER agrees to pay to the CONTRACTOR the prices set forth in the Standard Form of Agreement, OWNER and CONTRACTOR agree that the Contract is a unit cost agreement, unless stated otherwise, and that the final Contract amount is equal to the unit cost multiplied by the number of units authorized, installed and approved by the Owner. The OWNER does not assume any obligation to pay for any services or material not actually authorized and used. The CONTRACTOR hereby agrees to receive such prices as payment in full for furnishing all materials and all labor required for the aforesaid Work, and for 10-1012 00700-21 of 36 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT all expenses incurred by him, and for full performance of the Work and the whole thereof in the manner and according to this Agreement, Contract Documents, and the requirements of the ENGINEER. 6.05 PAYMENTS. No payments made or approvals or certificates given shall be considered as conclusive evidence of the performance of the Contract, either in whole or in part, nor shall any certificate, approval or payment be considered as acceptance of defective, deficient or non-conforming Work. CONTRACTOR shall, at any time requested during the progress of the Work, furnish the OWNER or the ENGINEER with an affidavit showing the CONTRACTOR's total outstanding indebtedness in connection with the Work. Before Final Payment is made, the CONTRACTOR shall satisfy the OWNER, by affidavit or otherwise, that there are no unpaid claims due subcontractors, suppliers or laborers by reason of any Work under the Contract. Acceptance by CONTRACTOR of Final Payment shall constitute a waiver of any and all claims of whatsoever nature against OWNER, arising out of or related to the Contract, or the Work, or any acts or omissions of OWNER or ENGINEER, which have not theretofore been timely filed as provided in this Contract. 6.06 PARTIAL PAYMENTS. When the Contract Price is a lump sum amount,prior to the first Application for Payment, CONTRACTOR shall submit to ENGINEER for review and approval a Schedule of Values, which shall fairly allocate the entire Contract Price among the various portions of the Work and shall be prepared in such form and supported by such data to substantiate its accuracy as the ENGINEER may reasonably require. The Schedule of Values shall follow the trade divisions of the Specifications so far as practicable. Upon approval, this Schedule of Values shall be used by ENGINEER as the basis for reviewing the Contractor's Application for Payment. Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. On or before the tenth day of each month, the CONTRACTOR shall prepare and submit to the ENGINEER, for approval or correction, an application for partial payment, being a statement showing as completely as practicable, the agreed unit quantities and extended total value of the Work done by the CONTRACTOR up to and including the twenty-fifth day of the preceding month; said statement shall also include the value of all conforming materials to be fabricated into the Work and stored in accordance with manufacturer's recommendations and as approved by the OWNER or ENGINEER at the Work site only. No payment will be made for materials stored until OWNER has approved in writing storage at the Work site. The ENGINEER shall then review such statement of unit quantities and application for partial payment and the progress of the Work made by the CONTRACTOR and, within ten days after the date ENGINEER receives CONTRACTOR's application for payment, if the application is found to be accurate and correct and the WORK conforming to the requirements of the Contract Documents, the ENGINEER shall certify the application for partial payment and shall deliver his preliminary certification for payment to the OWNER and the CONTRACTOR; or, if the ENGINEER finds that CONTRACTOR's application for payment contains an error or is otherwise disputed, he shall notify CONTRACTOR of such error or dispute, and shall prepare a preliminary certificate for partial payment for the undisputed amount of the application for payment due CONTRACTOR, and deliver it to the OWNER and CONTRACTOR. ENGINEER'S notice to CONTRACTOR that a bona fide dispute for payment exists shall include a list of the specific reasons for nonpayment. All payment applications made by CONTRACTOR and delivered to ENGINEER and all verifications and certification of such applications shall be made and transmitted within the Pro- Trak system and signed with the appropriate electronic signatures as provided for in the software. 10-1012 00700-22 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Such applications for payment shall not be considered complete unless accompanied by the CONTRACTOR'S Partial Waiver of Lien and Payment Affidavit, Section 00615, duly executed by an authorized representative of the CONTRACTOR and reflecting the correct corresponding amount of the payment application. The OWNER shall then pay the CONTRACTOR, within thirty (30) days of the date of ENGINEER's receipt of the application for payment, the undisputed balance due, less applicable retainage, and further less all previous payments and all further sums that may be retained or withheld by the OWNER under the terms of this Agreement. CONTRACTOR may submit a corrected application for payment after its receipt of the ENGINEER's notice of error or dispute, and such corrected application for payment shall be reviewed by the ENGINEER and disputed or paid under the same procedure and within the same time limits set out above. As a condition of any progress payment under this Agreement, CONTRACTOR shall execute and deliver to ENGINEER and OWNER a full release of all claims, direct or indirect, at law or in equity, arising out of or related to the Work to date, excluding retainage or any claims previously submitted as required under the terms of the Contract, and specifically identified and excluded by CONTRACTOR in the release. OWNER shall be entitled to retain from each progress payment five percent (5%) of the amount thereof. Such retainage shall be retained until Final Completion and satisfaction of all conditions for Final Payment. It is understood, however, that in case the whole Work be near to completion, as certified by the ENGINEER, and some unexpected or unusual delay occurs, through no neglect or fault on the part of the CONTRACTOR, the OWNER may, upon written recommendation of the ENGINEER, pay a reasonable and equitable portion of the retained percentage to the CONTRACTOR, or the CONTRACTOR, at the OWNER'S option, may be relieved of the obligation to fully complete the Work, and thereupon, the CONTRACTOR shall receive, at the OWNER'S option, payment of the balance due him under the Contract for Work completed in accordance with the Contract Documents, subject to OWNER's rights to otherwise withhold or retain payments, and subject to the conditions set forth under"6.08 FINAL PAYMENT." The Owner at its option and in compliance with Texas law may reduce retainage to less than the above-stated percentages. 6.07 USE OF COMPLETED PORTIONS & PUNCHLIST. The OWNER shall have the right to take possession of and use any completed or partially completed portions of the Work, notwithstanding that the time for completing the entire work or such portions may not have expired; but such taking possession and use shall not be deemed an acceptance of any work not completed in accordance with the Contract Documents. If such prior use increases the cost of or delays the Work, the CONTRACTOR shall promptly and within three (3) days of OWNER's taking possession, give OWNER written notice of same, and CONTRACTOR may be entitled to such extra compensation or extension of time, or both, as may be determined in accordance with the provisions of this Agreement. • 6.08 SUBSTANTIAL COMPLETION. The CONTRACTOR shall notify the OWNER AND ENGINEER, by letter executed by a duly qualified officer of CONTRACTOR, that in CONTRACTOR's opinion, the Work of the Contract, or an agreed portion thereof, is "Substantially Complete". Such notification shall include a list of all outstanding or incomplete items. Upon receipt, and within a reasonable time thereafter, of such notice, the ENGINEER and the CONTRACTOR shall jointly perform a walk-through and inspection of the Work to determine 10-1012 00700-23 of 36 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT the status of all or the identified portion of the work, and the ENGINEER shall prepare a detailed list of unfinished, incomplete, defective and/or non-conforming Work ("Punchlist"). If the ENGINEER determines that the Work is Substantially Complete in accordance with the Contract Documents, the ENGINEER shall issue to the OWNER and the CONTRACTOR a Certificate of Substantial Completion. OWNER shall have seven (7) days after receipt of Certificate to make written objection to the ENGINEER as to any provision of the Certificate or the attached list of non-conforming work. If ENGINEER concludes that the Work is not Substantially Complete, ENGINEER will, within fourteen (14) days, notify CONTRACTOR of the reason he believes the Work is not Substantially Complete. Upon Substantial Completion of the Work, ENGINEER will deliver to OWNER and CONTRACTOR a written recommendation as to division of responsibilities, pending fmal payment and acceptance, with respect to security, maintenance, utilities and damage to the Work, except as otherwise provided in the Certificate of Substantial Completion. NEITHER THE SUBSTANTIAL COMPLETION OF THE WORK, NOR THE OMISSION OF AN ITEM FROM THE PUNCHLIST, SHALL EXCUSE THE CONTRACTOR FROM PERFORMING ALL OF THE WORK UNDERTAKEN, WHETHER OF A MINOR OR MAJOR NATURE, AND THEREBY COMPLETING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. The Certificate of Substantial Completion shall establish the time period within which CONTRACTOR shall complete the Work for Final Acceptance by the Owner and ENGINEER. 6.08-1 OWNER shall have the right to exclude CONTRACTOR from the Work after the date of Substantial Completion, for security requirement reasons. OWNER may establish an access procedure to facilitate CONTRACTOR's uninterrupted access to the Work for the purposes of completing and correcting all items on the Punchlist in an expeditious manner. 6.09 FINAL PAYMENT. Final payment of the Retainage withheld from the Contract Price shall be made by the OWNER to the CONTRACTOR at such time as: (a) the Work, including all Change Orders and including all Punchlist work,has been fully completed in strict accordance with the Contract Documents; (b) the Contract has been fully performed except for the CONTRACTOR's responsibility to correct nonconforming Work during the warranty period set forth in the Contract Documents,and to satisfy other requirements, if any,which necessarily survive fmal payment; (c) CONTRACTOR delivers to OWNER a certificate evidencing that insurance required by the Contract Documents to remain in force after final payment is currently in effect and will not be cancelled or allowed to expire until at least 30 days prior written notice has been given to OWNER; (d) CONTRACTOR delivers to OWNER a Consent of Surety, if any, to fmal payment; (e) CONTRACTOR delivers to OWNER a complete set of As-Built Drawings, reflecting all deviations from the Plans, Specifications and approved shop drawings in the Work actually constructed, and delivers all maintenance and operating manuals and/or instructions; 10-1012 00700-24 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Club'\ (f) CONTRACTOR delivers to OWNER all building certificates required prior to occupancy and all other required inspections/approvals/acceptances by city, county, state governmental entities or other authorities having jurisdiction; (g) CONTRACTOR delivers to OWNER assignments of all guarantees and warranties from subcontractors, vendors, suppliers or manufacturers, as well as names, addresses and telephone numbers of contacts for each subcontractor,vendor, supplier or manufacturer; (h) CONTRACTOR removes all equipment,tools, temporary facilities, surplus materials and rubbish from the site,and final cleans the site to OWNER's satisfaction; (i) CONTRACTOR delivers to OWNER a Full and Final Release and Affidavit of Bills Paid in the form attached hereto as Attachment No. 2, executed by CONTRACTOR; (j) CONTRACTOR delivers to OWNER all other documentation required to be submitted to OWNER pursuant to the Contract Documents, including but not limited to any special guarantees or warranties, operation and maintenance manuals, etc'. in each case in a form satisfactory to OWNER as determined in OWNER's sole discretion; and (k) the Final Application for Payment has been approved by the ENGINEER and OWNER. Acceptance of Final Payment by the CONTRACTOR shall constitute a waiver of all claims by CONTRACTOR against OWNER other than any claims previously made in writing by CONTRACTOR against OWNER, and still unsettled, and except for claims arising out of third party actions, cross-claims and counterclaims. No interest shall be due or payable by OWNER to CONTRACTOR on any sums retained or withheld by OWNER pursuant to the terms or provisions of the Contract Documents, except as otherwise provided by applicable law. Neither the Certificate of Substantial Completion nor the Final Payment nor possession or acceptance of the Work shall relieve the CONTRACTOR of its obligation for correction of defective or non- conforming Work, or for fulfillment of any warranty, which may be required by law or by the Contract Documents. 6.10 CORRECTION OF WORK BEFORE FINAL PAYMENT. The CONTRACTOR shall promptly remove from OWNER's premises all materials, equipment or Work which is defective or otherwise not in conformance with the Contract Documents, whether actually incorporated in the Work or not, and CONTRACTOR shall, at his own expense, promptly replace such materials, equipment or Work with other materials conforming to the requirements of the Contract. The CONTRACTOR shall also bear the expense of restoring all work of CONTRACTOR or other contractors damaged by any such removal or replacement. If CONTRACTOR does not remove and replace any such unsuitable Work within ten(10) business days after receipt of a written notice from the OWNER or the ENGINEER, the OWNER may remove, replace and remedy such work at CONTRACTOR's expense. 10-1012 00700-25 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (''�`. 6.11 CORRECTION OF WORK AFTER FINAL PAYMENT. If within one (1) year \\ from the date of Substantial Completion or such longer period of time as may be prescribed by law or by the terms of any applicable special warranty required by the Contract Documents, any of the Work is found to be defective or not in accordance with the Contract Documents, CONTRACTOR shall, at its sole cost, correct it and any other work affected thereby promptly after receipt of a written notice from OWNER to do so. In addition, CONTRACTOR shall be responsible for any damage to building contents, when such damage results from the CONTRACTOR's use of faulty materials or defective workmanship; to the extent such damage is not covered by OWNER's insurance. This warranty period shall renew and recommence for each corrected item of Work upon completion of the remedial work. This time period for correction by CONTRACTOR is in addition to, and not in lieu of, all warranties or remedies,which exist at common law or by statute. These warranty obligations shall survive the termination of this Contract, and shall be enforceable by a decree of specific performance, in addition to such other rights and remedies available to OWNER at law or in equity. 6.12 PAYMENTS WITHHELD. The OWNER may withhold, or on account of subsequently discovered evidence nullify and demand immediate repayment of, the whole or part of any certificate for payment or payment, to such extent as may be necessary to protect OWNER from loss on account of: (a) Defective or non-conforming Work not remedied; (b) Claims filed or reasonable evidence indicating probable filing of claims; (c) Failure of the CONTRACTOR to make payments promptly to subcontractors or for material or labor; (d) Damage to another contractor, OWNER, existing improvements on the site, or to adjacent or adjoining property; (e) Reasonable doubt that the Work can be completed for the unpaid balance of the Contract amount; (f) Reasonable indication that the Work will not be completed within the Contract Time; (g) Failure on the part of the CONTRACTOR to execute any and -all documents, releases or other documents presented to the CONTRACTOR for execution, as provided for herein or otherwise; (h) Liquidated or other damages due to late completion; and/or (i) Any breach by CONTRACTOR of this Contract or any other agreement between OWNER and CONTRACTOR. When the above grounds are removed to OWNER's satisfaction, the withheld payment shall be made promptly. If the said causes are not so remedied,OWNER may remedy the same for CONTRACTOR's account, charge the entire cost thereof to CONTRACTOR and deduct such cost 10-1012 00700-26 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (1.1h\ from the.Contract Sum or from any payments due or to become due under any other agreement between OWNER and CONTRACTOR. 6.13 DELAYED PAYMENTS. Should the OWNER fail to make payment to the CONTRACTOR when payment is due in accordance with the terms of the Contract Documents, any interest due CONTRACTOR for late payments shall accrue and be paid in accordance with the provisions of Chapter 2251 of the Texas Government Code, as amended, and payment of such interest shall fully liquidate and compensate any injury to the CONTRACTOR growing out of such delay in payment. Should OWNER fail to pay CONTRACTOR an undisputed amount due within the time limits provided in the Contract or applicable law, CONTRACTOR shall give the notice required and comply with the provisions of Section 2251.051 of the Texas Government Code,and shall thereupon be entitled to the rights and remedies provided therein. 7.0 EXTRA WORK AND CLAIMS 7.01 DIFFERING SITE CONDITIONS. During the progress of the work, if subsurface, latent physical conditions or unknown physical conditions of an unusual nature are encountered at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, the CONTRACTOR shall notify the OWNER's Representative in writing within three(3) calendar days of the specific differing conditions before the site is disturbed and before the affected work is performed. (a)Upon written notification,the ENGINEER will investigate the conditions, and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract,an adjustment, excluding anticipated profits,will be made and the contract modified in writing accordingly. The ENGINEER will notify the CONTRACTOR in writing of the determination whether or not an adjustment of the contract is warranted. (b)No contract adjustment which results in a benefit to the CONTRACTOR will be allowed unless the CONTRACTOR has provided the required written notice. (c)No contract adjustment will be allowed under this clause for any effects caused on unchanged work. 7.02 SUSPENSIONS OF WORK ORDERED BY THE ENGINEER. If the performance of all or any portion of the work is suspended by the ENGINEER in writing for seven(7) calendar days and the CONTRACTOR believes that additional compensation and/or contract time is due as a result of such suspension,the CONTRACTOR shall submit a written request for adjustment to the ENGINEER within seven(7) calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment. (a) Upon receipt, the ENGINEER will evaluate the CONTRACTOR's request. If the ENGINEER agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the CONTRACTOR, its suppliers, or subcontractors at any approved tier, and not caused by weather, the ENGINEER will make 10-1012 00700-27 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (1.1'\ an adjustment(excluding profit)and modify the contract in writing accordingly. The CONTRACTOR will be notified of the ENGINEER's determination, in writing, whether or not an adjustment of the contract is warranted. (b)No contract adjustment will be allowed unless the CONTRACTOR has submitted the request for adjustment within the time prescribed. (c)No contract adjustment will be allowed under this clause to the extent that performance would have been suspended by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this contract. 7.03 CHANGE ORDERS.Without invalidating this Agreement, the OWNER may, at any time or from time to time, order additions, deletions or revisions to the Work; such changes will be authorized by Change Order to be prepared by the ENGINEER for execution by the OWNER and the CONTRACTOR. The Change Order shall set forth the basis for any change in Contract Price, as hereinafter set forth for Extra Work, and any change in Contract Time,which may result from the change. 7.04 In accordance with paragraph 1.07 CONTRACTOR'S request to work weekends, the Owner's Construction Manager shall,upon receipt of written notice by the CONTRACTOR of the need to conduct work on otherwise non-Work Days,prepare a cost estimate for providing Construction Management and Inspection services during the requested period and submit this to ,4011 both OWNER and CONTRACTOR. If approved by both parties the Construction Manager shall prepare a Deductive Change Order in the amount stated in the estimate for the signature of the CONTRACTOR and the OWNER for inclusion in the next Pay Application. The Deductive Change Order must be signed and executed by both the OWNER and CONTRACTOR prior to start of work on any non-Work Day. 7.05 MINOR CHANGES. The ENGINEER may authorize minor changes in the Work not inconsistent with the overall intent of the Contract Documents and not involving an increase in Contract Price or time. If the CONTRACTOR believes that any minor changes authorized by the ENGINEER involves Extra Work or entitles him to an increase in the Contract Price or the Contract Time, the CONTRACTOR shall give notice of same by written request to the ENGINEER for a written Work Order, with a copy to OWNER. Any such notice and request by the CONTRACTOR shall be given prior to beginning the changed work. CONTRACTOR's commencement of any minor change in the Work prior to such written notice and request shall constitute a waiver of any and all claims for an increase in the Contract Price or the Contract Time arising out of or related to such changed work. 7.06 EXTRA WORK. It is agreed that the CONTRACTOR shall perform all work when presented with a written Change Order, Work Change Directive or Work Order signed by the ENGINEER, subject, however, to the right of the CONTRACTOR to require written confirmation of such Change Order, Work Change Directive or Work Order by the OWNER. It is agreed that the basis of compensation or adjustment to the CONTRACTOR for work either altered, added or deleted by a Change Order or Work Change Directive, or for which a claim for Extra Work is made, shall be determined by one or more of the following methods: Method(A) --By Contract unit prices applicable to the work, if any; or 10-1012 00700-28 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 7\1 Method(B) --By agreed unit prices or agreed stipulated lump sum pric e; Method(C) --If neither Method(A) nor Method (B) can be agreed upon before the Extra Work is commenced, then the CONTRACTOR shall be paid the "Actual Field Cost" of the work plus: a) For subcontractors performing work mark-up shall be limited to fifteen percent, ten(10%) for the subcontractor plus five (5%) for the General Contractor or b)For the General Contractor alone, self-performing the extra work,without subcontractor, the mark-up shall not exceed ten percent (10%), as full and final compensation for the Extra Work and all costs and expenses, direct or indirect, arising out of or related thereto. In the event said Extra Work or Change Order or Work Change Directive work is performed and paid for under Method(C), then the provisions of this paragraph shall apply and the"Actual Field Cost" is hereby defined as the cost to the CONTRACTOR of all workers, such as foremen, timekeepers, mechanics and laborers, and materials, supplies, trucks, rentals of machinery and equipment, for the time actually employed or used on such Extra Work or Change Order or Work Change Directive work, plus actual transportation charges necessarily incurred together with all power, fuel, lubricants, water and similar operating expenses, plus all necessary incidental expenses incurred directly on account of such Extra Work, including Social Security, Old Age Benefits and other payroll taxes, and a rateable proportion of premiums on Performance and Payment Bonds and Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation, and all other insurance as may be required by law or ordinance, or the Contract Documents,plus all payments to subcontractors for such work. The ENGINEER may direct the form in which accounts of the "Actual Field Cost" shall be kept and the records of these accounts shall be made available to the ENGINEER. The ENGINEER or OWNER may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise these matters shall be determined by the CONTRACTOR. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using one hundred percent (100%), unless otherwise specified, of the latest schedule of Equipment Ownership Expense adopted by the Associated General Contractors of America where practicable. The mark-up of the "Actual Field Cost" to be paid to the CONTRACTOR, shall cover and compensate him for his profit, overhead, and all other elements of cost and expense not embraced within the"Actual Field Cost" as herein defined, save that where the CONTRACTOR's field office must be maintained solely on account of such Extra Work, then the cost to maintain and operate the same shall be included in the "Actual Field Cost." No claim for Extra Work of any kind will be allowed unless ordered by the ENGINEER in a written Work Order. In case any orders or instructions, either oral or written, appear to the CONTRACTOR to involve Extra Work for which he should receive compensation or an adjustment in the Contract Time, he shall make written request to the ENGINEER for a written Work Order authorizing such Extra Work within ten (10) days of ENGINEER's orders or instructions, otherwise the orders or instructions will be considered minor changes. The issuance of a Work Order by the ENGINEER shall not constitute or be construed as an agreement or 10-1012 00700-29 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Cab\' acknowledgement by the ENGINEER that the work which is the subject of the Work Order is Extra Work outside the scope of the Contract Work, but shall merely constitute a direction to the CONTRACTOR to perform the work, and the CONTRACTOR shall proceed with the work, and shall keep an accurate account of the "Actual Field Cost" thereof, as provided under Method (C). Upon completion of the alleged Extra Work, the CONTRACTOR shall promptly and within ten (10) days submit his claim to the ENGINEER by proper certification and attestation, on forms provided by the ENGINEER. The ENGINEER shall render a written decision on CONTRACTOR's claim within ten (10) days. It is mutually agreed between the parties that the ENGINEER's decision on all claims or questions in relation to the Work, CONTRACTOR's performance of the Work, any changes in the Work or Extra Work, the Contract Price and/or the Contract Time, shall be fmal and conclusive and binding upon the parties. If the ENGINEER shall fail to respond in writing to CONTRACTOR's claim within thirty (30) days of the date of submission, or if CONTRACTOR shall dispute or object to ENGINEER's decision on any claim, and CONTRACTOR fails to file a Request for Mediation of such claim in accordance with the provisions of Article 9.0, within sixty(60) days after the date of submission to the ENGINEER, or such longer period as the parties may agree to in writing, the CONTRACTOR shall lose and forfeit his right to make such claim for Extra Work at any later date, and all such claims held by the CONTRACTOR shall be deemed waived, forfeited and forever barred. CONTRACTOR shall continue to diligently prosecute the Work notwithstanding any pending claim, dispute, or dispute resolution process between OWNER and CONTRACTOR. 7.07 TIME OF FILING CLAIMS. Except as otherwise provided herein, all questions of dispute or adjustment shall be made within the Pro-Trak system and filed with the ENGINEER Cis'\ within three (3) days after the ENGINEER has given any directions, order or instruction to which the CONTRACTOR desires to take exception. The ENGINEER shall reply within thirty(30) days to such written exceptions, and render his final decision in writing. It is mutually agreed between the parties that the ENGINEER's decision on all claims or questions in relation to the Work, CONTRACTOR's performance of the Work, any changes in the Work or Extra Work, the Contract Price and/or the Contract Time, shall be final and conclusive and binding upon the parties. In case the CONTRACTOR should desire to appeal from the ENGINEER's decision, the CONTRACTOR may request a meeting between representatives of the OWNER and the CONTRACTOR for the purposes of appealing the ENGINEER's decision directly to the OWNER, such meeting to occur within ten (10) days after the date of the CONTRACTOR's request, or such longer period as may be agreed to by the parties in writing. If the CONTRACTOR shall still be aggrieved after a meeting with the OWNER and/or his representative, the CONTRACTOR shall have sixty (60) days after the date of the meeting, or such longer period as the parties may agree to in writing, to file a Request for Mediation of such claim in accordance with the provisions of Article 9.0. In the event the CONTRACTOR shall fail, for any reason, to timely file a Request for Mediation,the OWNER shall be released of any and all liability, and the CONTRACTOR's failure to timely file a Request for Mediation shall constitute a waiver, forfeit and fmal bar of all such claims held by the CONTRACTOR against the OWNER. CONTRACTOR shall continue to diligently prosecute the Work notwithstanding any pending claim, dispute, or dispute resolution process between OWNER and CONTRACTOR. 8.0 DEFAULT 8.01 DEFAULT BY CONTRACTOR. In case the CONTRACTOR should abandon and fail or refuse to resume Work within five (5) days after written notification from the OWNER 10-1012 00700-30of36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT or the ENGINEER, or if the CONTRACTOR fails to comply with the orders of the ENGINEER when such orders are consistent with the Contract Documents, or if the CONTRACTOR otherwise defaults on its obligations under the Contract, OWNER shall have the right, if it so elects and without prejudice to any other rights it may have, after giving five (5) days written notice of default to CONTRACTOR and any surety, to terminate the Contract or any part thereof and/or to take over or cause others to take over the Work or any part thereof, and to complete such Work for the account of CONTRACTOR. Where Performance and Payment Bonds exist, the sureties on these bonds shall be directed to complete the Work in conjunction with the notice of default, and a copy of said notice shall be delivered to the CONTRACTOR. After receiving said notice of default,the CONTRACTOR shall promptly and within no more than three (3) days, remove from the Work any machinery, equipment, or tools then on the job, not intended for incorporation into the Work. Should CONTRACTOR fail to promptly remove such machinery, equipment or tools, OWNER may remove such machinery, equipment or tools and store same at CONTRACTOR's expense; return such machinery, equipment or tools to their purported owner; or otherwise dispose of such machinery, equipment or tools as OWNER sees fit. Any materials, supplies and/or equipment delivered for use in the Work, may be used in the completion of the Work by the OWNER or the surety on the Performance Bond, or another contractor in completion of the Work; it being understood that the use of such equipment, supplies and materials will ultimately reduce the cost to complete the Work and be reflected in the final settlement. Where there is no Performance Bond or in case the surety should fail to commence compliance with the notice for completion hereinabove provided for within ten (10) days after the service of such notice, then the OWNER may provide for completion of the Work in either of the following elective manners: (a) The OWNER may thereupon employ such force of workers and use such machinery, equipment, tools, materials and supplies as the OWNER may deem necessary to expeditiously complete the Work, and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said CONTRACTOR, and expense so charged shall be deducted and paid by the OWNER out of such monies as may be due or that may thereafter at any time become due to the CONTRACTOR under and by virtue of this Agreement or any other agreement between OWNER and CONTRACTOR. In case such expense is less than the sum which would have been payable under this Contract if the same had been completed by the CONTRACTOR, then said CONTRACTOR shall be credited with the difference. In case such expense is greater than the sum which would have been payable under this Contract if the same had been completed by such CONTRACTOR, then the CONTRACTOR and/or his surety shall promptly pay the amount of such excess to the OWNER upon demand; or (b) The OWNER, under sealed bids, under the times and procedures provided for by law, may let the contract for completion of the Work under substantially the same terms and conditions which are provided in this Contract. In case of any increase in cost to the OWNER under the completion contract, as compared to what would have been the cost under this Contract, such increase shall be charged to the Club'\ CONTRACTOR, and the amount of such increase may be deducted by the OWNER out of such monies as may be due or that may thereafter at any time 10-1012 00700-31 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT become due to the CONTRACTOR under and by virtue of this Agreement or any other agreement between OWNER and CONTRACTOR, or the CONTRACTOR and/or his surety shall promptly pay the amount of such increase to the OWNER upon demand. However, should the cost to complete any such completion contract prove to be less than what would have been the cost to complete under this Contract, the CONTRACTOR and/or his surety shall be credited therewith. In the event of a default by CONTRACTOR, no further payments shall be made to CONTRACTOR under the Contract until the Work is Finally Completed. When the Work shall have been Finally Completed,the CONTRACTOR and his surety shall be so notified. A complete itemized statement of the Contract accounts, certified by the ENGINEER as being correct, shall then be prepared and delivered to the CONTRACTOR and his surety, whereupon the CONTRACTOR and/or his surety shall pay the balance due as reflected by said statement. The OWNER, prior to incurring an obligation to make payment hereunder, shall have such statement of completion attested to by the CONTRACTOR and the surety as accurate, and in exchange for payment of the sum stated therein, the OWNER shall be entitled to a full and final release of any claims or demands by the CONTRACTOR or the surety. In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the OWNER had the work been completed by the CONTRACTOR under the terms of this Contract, or when the CONTRACTOR and/or his surety shall pay the balance shown to be due by them to the OWNER, then all machinery, equipment, tools or supplies left on the site of the Work shall be turned over to the CONTRACTOR and/or his (0'11'N, surety. Should the cost to complete the Work exceed the Contract Price, and the CONTRACTOR and/or his surety fail to pay the amount due the OWNER within the time designated above, and there remains any machinery, equipment, tools, materials or supplies which are the property of CONTRACTOR on the site of the Work, notice thereof, together with an itemized list of such equipment and materials, shall be mailed to the CONTRACTOR and his surety at the respective addresses designated in the Contract, provided, however, that actual written notice given in any manner will satisfy this condition. After mailing or other giving of such notice, such property shall be held at the risk of the CONTRACTOR and his surety, subject only to the duty of the OWNER to exercise ordinary care to protect such property. After fifteen (15) days from the date of such notice, the OWNER may sell such property, equipment, tools, materials or supplies, and apply the net sum derived from such sale to the credit of the CONTRACTOR and his surety. Such sale may be made at either public or private sale, with or without notice, as the OWNER may elect. The OWNER shall release any machinery, equipment, tools, materials or supplies, which remain on the Work, and belong to persons other than the CONTRACTOR or his surety, to their reputed owners. 8.02 SUPPLEMENTATION OF CONTRACTOR FORCES. If CONTRACTOR at any time shall, in OWNER'S sole opinion, fail to furnish skilled workers, suitable materials, supplies or adequate equipment sufficient for the prompt, timely and diligent prosecution of the Work in accordance with OWNER's direction, OWNER shall have the right, without prejudice to the exercise of other remedies for the same default and without fully taking over the Work, to supplement CONTRACTOR's forces and to expedite delivery of and to procure and furnish such workers, materials, tools, supplies or equipment for CONTRACTOR's account by employing other contractors and suppliers engaged in the same class of work and charge the entire cost Calk`, thereof to CONTRACTOR, said cost to be deducted from sums due or to become due to 10-1012 00700-32 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT CONTRACTOR under the Contract or any other agreement with OWNER or any parent, subsidiary or affiliate of OWNER. 8.03 CUMULATIVE REMEDIES & SPECIFIC PERFORMANCE. All rights and remedies of OWNER, under the terms of the Contract and/or available at law or in equity, are cumulative. In the event CONTRACTOR or any of its subcontractors, vendors or suppliers fails or refuses for any reason to provide timely manufacture, fabrication, delivery, installation, erection, construction or completion of any supplies, materials, expendables, equipment, machinery, accessories or appurtenances to be furnished hereunder, CONTRACTOR acknowledges and agrees that such items are required, necessary, essentially unique to the Project and the Work and will cause irreparable harm to OWNER and the Project if not furnished in accordance with the Contract, and OWNER shall have the right to obtain a decree of specific performance and mandatory injunctive relief from any Court of competent jurisdiction to ensure the timely furnishing of such items. 8.04 CROSS-DEFAULT. If, for any reason, CONTRACTOR is declared in default and/or terminated by OWNER under any other agreement with OWNER, whether related to the Project or not related to the Project, OWNER shall have the right to offset and apply any amounts which might be owed to OWNER by CONTRACTOR under any other such agreements against any earned but unpaid amounts owing to CONTRACTOR by OWNER under the Contract, any retainage earned by CONTRACTOR under the Contract or any unearned, unpaid amount under the Contract. 8.05 INSOLVENCY. It is recognized that if CONTRACTOR becomes a debtor in Ca ' voluntary or involuntary bankruptcy proceedings, makes a general assignment for the benefit of creditors, or if a receiver is appointed on account of his insolvency, such events could seriously impair or frustrate CONTRACTOR's performance of the Work. Accordingly, it is agreed that should CONTRACTOR become a debtor in bankruptcy, either voluntary or involuntary, CONTRACTOR shall notify OWNER in writing within twenty-four (24) hours of the filing with the bankruptcy court. Further, it is agreed that upon occurrence of any one or more such events, OWNER shall be entitled to request of CONTRACTOR or its successors, trustees or receivers, adequate assurances of future performance. In the event such adequate assurances are not given to the reasonable satisfaction of OWNER within seventy-two (72) hours of such request, OWNER shall have the right to immediately invoke the remedies of this Section 8 or as provided by law. Pending receipt of such adequate assurances of such future performance, OWNER may proceed with the Work on a temporary basis and deduct the costs, plus reasonable overhead and profit, from any amounts due or which may become due to CONTRACTOR under the Contract or any other agreement with OWNER. In this regard, OWNER and CONTRACTOR agree that delays in performance could result in more damages to CONTRACTOR than would be sustained if OWNER failed to exercise such remedies. 8.06 CONTINGENT ASSIGNMENT. CONTRACTOR hereby assigns to OWNER, all of CONTRACTOR's rights under and interest in any and all subcontracts and/or purchase orders entered into by CONTRACTOR pursuant to this Agreement, such assignment to become effective upon CONTRACTOR's default under this Agreement or OWNER's termination of this Contract, and OWNER's acceptance of such assignment. Upon CONTRACTOR's default or OWNER's termination of this Contract, OWNER may, in the event there is no performance bond for the Contract, or in the event the performance bond surety fails to complete the Contract, or if OWNER otherwise so elects in its sole discretion, accept such assignment by written notice of such 10-1012 00700-33 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT acceptance to CONTRACTOR and subcontractor, and may require subcontractors to perform all of the then unperformed duties and obligations under the subcontract, for the direct benefit of OWNER. In the event OWNER requires such performance by a subcontractor, then OWNER shall be obligated to pay such subcontractor any amounts due and owing under the terms of the subcontract/purchase order, at the subcontract prices and rates, and subject to any rights of withholding or offset and other terms and conditions of the subcontract, for all work properly performed by such subcontractor, to the date of OWNER's acceptance and thereafter. OWNER's liability in this connection, however, shall not exceed the amount obtained by subtracting all payments made by CONTRACTOR to subcontractor from the Subcontract Price at the time of CONTRACTOR's default or OWNER's termination of CONTRACTOR. CONTRACTOR shall include a provision in its subcontracts that allows such assignment and allows OWNER to take these actions, and further provides that in the event of CONTRACTOR's termination for default, the subcontractor agrees to give the OWNER or its agent the right to inspect all books and records of subcontractor relating to the Work. 8.07 WAIVER OF CONSEQUENTIAL DAMAGES. CONTRACTOR expressly waives any and all claims for consequential damages against OWNER arising out of or related to this Contract, or any other agreements between CONTRACTOR and OWNER, including,but not limited to, claims for damages incurred by CONTRACTOR for principal office expenses, including the compensation of personnel stationed there, losses of financing, bonding capacity, business and reputation, and claims for lost profit,whether on this Contract or otherwise. 8.08 TERMINATION FOR CONVENIENCE. OWNER may at its sole discretion, upon five (5) days written notice to CONTRACTOR, terminate this Contract, in whole or in part, if and when OWNER determines that it is in the best interest of OWNER to do so. Upon receipt of such written notice from OWNER, CONTRACTOR shall cease all terminated Work and take reasonable precautions to protect and preserve such work, and shall take all reasonable measures after consultation with OWNER to terminate or assign to OWNER all subcontracts, purchase orders or other commitments related to the Work or the Project on terms and conditions acceptable to OWNER. CONTRACTOR will be paid for all Work performed in strict accordance with the Contract Documents, based upon the Contract Price and the percentage of completion on the date of termination, and less amounts previously paid, subject to any reasonable backcharges attributable to CONTRACTOR's failure to comply with any of the provisions of this Contract and further subject to the other terms of this Contract regarding payment. In no event will CONTRACTOR receive or be entitled to any payment or compensation whatsoever for interruption of business or loss of business opportunities, any other items of consequential damages, for overhead or loss of profits on the unperformed Work and/or services and unfurnished materials or for any intangible, impact or similarly described cost, damages or expense, and under no circumstances shall the total sum paid to or received by CONTRACTOR under this Contract exceed the Contract Price. The compensation provided herein shall be CONTRACTOR's sole and exclusive remedy arising out of a termination for convenience. 8.09 DEFAULT BY OWNER. In case the OWNER shall default on its material obligations under this Contract, other than OWNER's failure to pay CONTRACTOR a disputed amount due within the time limits provided in the Contract or applicable law, as addressed by Section 6.13 of this Agreement, and shall fail or refuse to cure, or to commence and diligently pursue cure of such default within fifteen (15) days after written notification by the CONTRACTOR,.then the CONTRACTOR may suspend or wholly abandon the Work, and may remove therefrom all machinery, tools and equipment, and all materials on the site of the Work 10-1012 00700-34 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT that have not been included in payments to the CONTRACTOR and have not been incorporated into the Work. And thereupon, the ENGINEER shall make an estimate of the total amount earned by the CONTRACTOR, which estimate shall include the value of all Work actually completed by said CONTRACTOR (at the Contract Prices), the value of all partially completed Work at a fair and equitable price, and the amount of all Extra Work performed at the prices agreed upon, or provided for by the terms of this Contract, and a reasonable sum to cover the cost of any provisions made by the CONTRACTOR to carry the whole Work to completion and which cannot be utilized. The ENGINEER shall then make a final statement of the balance due the CONTRACTOR by deducting from the above estimate all previous payments by the OWNER and all other sums that may be retained by the OWNER under the terms of this Agreement, and shall present the same to the OWNER, and OWNER's payment of said sum to the CONTRACTOR, on or before thirty (30) days after OWNER's receipt of such statement, shall satisfy any and all rights, claims or causes of action of CONTRACTOR arising out of or related to such default by OWNER, and shall be CONTRACTOR's sole and exclusive remedy for such default. A disputed or unilateral claim by the Contractor cannot by itself constitute a default hereunder. 9.0 DISPUTE RESOLUTION Any dispute or pending claim or dispute resolution process between OWNER and CONTRACTOR shall not excuse or relieve CONTRACTOR of its obligations under the Contract, and CONTRACTOR shall diligently prosecute the Work notwithstanding any pending claim, dispute,or dispute resolution process'between OWNER and CONTRACTOR. (1.6.\ All claims, disputes and other matters in question arising out of or relating to, the Contract, or the breach thereof, shall be subject to mediation as a condition precedent to any other dispute resolution process as may be selected by OWNER. Unless mutually agreed otherwise the mediation shall be conducted by a third party who will be selected by agreement between OWNER and CONTRACTOR, and Request for Mediation shall be filed with the other party. The parties shall share the mediator's fee and any filing fees equally. If a claim, dispute or other matter in question between OWNER and CONTRACTOR involves the work of a subcontractor or supplier, OWNER or CONTRACTOR may join such subcontractor or supplier as a party to any mediation proceeding between OWNER and CONTRACTOR hereunder. CONTRACTOR shall include in all subcontracts and/or purchase orders related to the Work a specific provision whereby the subcontractor or supplier consents to being joined in mediation between OWNER and CONTRACTOR involving the work of such subcontractor or supplier. This Contract shall be governed by the laws of the State of Texas and shall be considered performable in Brazoria County, Texas, for venue purposes. Further, the OWNER and CONTRACTOR stipulate that venue for any dispute resolution proceeding involving or touching upon the Contract other than the conduct of an arbitration hearing shall be in Brazoria County, Texas, or, if such choice of venue is prohibited or unenforceable by law, shall be held in the county where the Project is located. CONTRACTOR agrees to pay OWNER all reasonable attorneys' fees incurred by OWNER in the event OWNER seeks to enforce any provision of this Contract whether by arbitration or other dispute resolution process. Further, in the event OWNER defends any claim instituted by CONTRACTOR against OWNER, whether in arbitration or other dispute resolution 10-1012 00700-35 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Clua process, CONTRACTOR agrees to pay OWNER all reasonable attorneys' fees incurred by OWNER in defending such claim provided OWNER is the prevailing party, in whole or in part,in such proceeding. CI's\ 10-1012 00700 36 of36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ("'\ ATTACHMENT NO. 1 TO GENERAL CONDITIONS WORKERS' COMPENSATION INSURANCE COVERAGE A. DEFINITIONS: Certificate of coverage ("certificate") . A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC81, TWCC-82, TWCC-83 or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project for the duration of the Project. Duration of the Project includes the time from the beginning of the Work on the Project until the contractor's/person's work on the Project has been completed and the Project warranty period has expired. Persons providing services on the project includes persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with due contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, motor carriers and owner- operators, (as defined at Section 406.121 of the Texas Labor Code), leasing companies, and employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The CONTRACTOR shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Title 5 Workers' Compensation, Subtitle A Texas Workers' Compensation Act, for employees of the contractor providing services on the project, for the duration of the project. C. The CONTRACTOR must provide a certificate of coverage to the OWNER prior to being awarded the Contract. D. If the coverage period shown on the CONTRACTOR's current certificate of coverage ends during the duration of the project, the CONTRACTOR must, prior to the end of the coverage period, file a new certificate of coverage with the OWNER showing that coverage has been extended. E. The CONTRACTOR shall obtain from each subcontractor or other person providing services on a project, and provide to the OWNER: (I) a certificate of coverage, prior to that person beginning work on the Project, so the Club' OWNER will have on file certificates of coverage showing coverage for all persons providing services on the Project; and 05/2007 00700-Al CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (2) no later than seven days after receipt by the CONTRACTOR and prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. F. The CONTRACTOR shall retain all required certificates of coverage for the duration of the Project and for one year thereafter. G. The CONTRACTOR shall notify the OWNER in writing by certified mail or personal delivery, within 10 days after the CONTRACTOR knew or should have known, of any changes that materially affect the provision of coverage of any person providing services on the Project. H. The CONTRACTOR shall post on each Project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. NOTICE REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must, be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at (512) 440- 3789 to receive information on the legal requirements for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." The CONTRACTOR shall contractually require each person with whom it contracts to provide services on a project, too: (1) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Title 5 Workers' Compensation, Subtitle A Texas Workers' Compensation Act, for all of its employees providing services on the Project, for the duration of the Project; (2) provide to the CONTRACTOR,prior to that person beginning work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the 7`, Project: 05/2007 00700-A2 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (3) provide the CONTRACTOR,prior to the end of the coverage period, a new certificate of coverage, showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; (4) obtain from each other person with whom it contracts, and provide to the CONTRACTOR: (a) a certificate of coverage,prior to the other person beginning work on the Project; and (b) a new certificate of coverage showing extension of coverage,prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; (5) retain all required certificates of coverage on file for the duration of the Project and for one year thereafter; (6) notify the OWNER in writing by certified mail or personal delivery, within 10 days after the person knew or should have known,of any change that materially affects the provision of coverage of any person providing services on the Project; and (7) contractually require each person with whom it contracts,to perform as required by paragraphs(1) - (7),with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this Contract or providing or causing to be provided a certificate of coverage, the CONTRACTOR is representing to the OWNER that all employees of the CONTRACTOR who will provide services on the Project will be covered by workers' compensation coverage for the duration of the Project, that the coverage agreements will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the CONTRACTOR to administrative penalties, criminal penalties, civil penalties, or other civil actions. K. The CONTRACTOR's failure to comply with any of these provisions is a breach of contract by the CONTRACTOR, which entitles the OWNER to pursue all rights and remedies available to it under the Contract,at law or in equity, if the CONTRACTOR does not remedy the breach within ten days after receipt of notice of breach from the OWNER. 05/2007 00700-A3 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ATTACHMENT NO.2 TO GENERAL CONDITIONS • AGREEMENT FOR FINAL PAYMENT AND CONTRACTOR'S SWORN RELEASE In consideration of the Final Payment under that certain contract between [Contractor's Company Name] (hereafter "CONTRACTOR") and the City of Pearland (hereafter "OWNER") for the Project known as [Official Project Title] (the "Contract"), the CONTRACTOR makes the following representations to OWNER, either individually if a proprietorship, or jointly and severally by all general partners if a partnership, or if a corporation, by action of the president and secretary of said corporation, as duly authorized by appropriate action of the stockholders and/or board of directors of said corporation, their signatures hereon constituting a representation under oath by said individuals that they have the authority to execute this Agreement for and on behalf of the said corporation: 1. The undersigned CONTRACTOR represents to OWNER that the Application for Payment for the Final Payment under the Contract, and the final Change Order issued under the Contract if any, whether or not modified, corrected or changed in some way by the ENGINEER, the CONTRACTOR or the OWNER, a copy of which are attached hereto and marked Exhibit "A", are true, correct and accurate, and that CONTRACTOR has received payment in full for all other Applications for Payment submitted under the Contract, and that CONTRACTOR has been fully compensated for all labor, materials, equipment and/or services furnished in connection with the Contract, except for the Final Payment. 2. It is agreed and stipulated by the undersigned CONTRACTOR that upon the receipt of Final Payment in the amount as set out on the attached Application for Payment, the CONTRACTOR, by execution of this instrument of release, does, therefore, RELEASE and FOREVER DISCHARGE OWNER of and from all manner of debts, claims, demands, obligations, suits, liabilities and causes of action of any nature whatsoever, at law or in equity, in contract or in tort, now existing or which may hereafter accrue, arising out of or related to the Contract, any Change Orders or Work Orders, the Work, or any labor, materials, equipment or services furnished by CONTRACTOR to OWNER. 3. The CONTRACTOR, acting by and through the person or persons whose names are subscribed hereto, does solemnly swear and affirm that all bills and claims have been paid to all materialmen, suppliers, laborers, subcontractors, or other entities performing services or supplying materials or equipment, and that OWNER shall not be subject to any bills, claims, demands, litigation or suits in connection therewith. 4. It is further specifically understood and agreed that this Agreement for Final Payment and Contractor's Sworn Release shall constitute a part of the Contract, and it is also specifically understood and agreed that this Agreement shall not act as a modification, waiver or renunciation by OWNER of any of its rights or remedies as set out in the Contract itself, but this Agreement for Final Payment and Contractor's Sworn Release shall constitute a supplement thereto for the additional protection of OWNER. 05/2007 00700-B 1 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT r SIGNED and EXECUTED this,the day of , 20 . CONTRACTOR: By: Signature Print Name: Title: [If CONTRACTOR is a proprietorship, owner must sign; if a partnership, each general partner must sign; if a corporation, the following language should be used.] SIGNED and EXECUTED this,the day of 20 by , a Texas corporation,under authority granted to the undersigned by said corporation as contained in the Charter, By-Laws or Minutes of a meeting of said corporation regularly called and held. CONTRACTOR: By: President ATTEST: Corporate Secretary (Corporate Seal) [This form is for use by either a proprietorship or a partnership. In the event CONTRACTOR is a partnership or a joint proprietorship,additional signature lines should be added for each individual.] (111 05/2007 00700-B2 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT AFFIDAVIT STATE OF TEXAS § COUNTY OF § BEFORE ME,the undersigned authority, on this day personally appeared the person or persons whose name(s) are subscribed to the above and foregoing Agreement for Final Payment and Contractor's Sworn Release,who each, after being by me duly sworn, on their oaths deposed and said: I(We) am(are)the person(s)who signed and executed the above and foregoing Agreement for Final Payment and Contractor's Sworn Release, and I(we)have read the facts and statements as therein set out and the representations as made therein, and I(we) state that the above and foregoing are true and correct. CONTRACTOR-Affiant SWORN TO AND SUBSCRIBED TO before me,the day of 20_. Notary Public, State of Texas My Commission Expires: [This form is for use in the event CONTRACTOR is a corporation.] 07/2006 00700-B3 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT AFFIDAVIT STATE OF TEXAS § COUNTY OF § BEFORE ME,the undersigned authority, on this day personally appeared the persons who signed and executed the above and foregoing Agreement for Final Payment mid Contractor's Sworn Release,whose names are set out above,who each, after being by me duly sworn, on their oaths deposed and said: We each are the persons whose names are subscribed above, and hold respectively the offices in the corporation as set out above, and each state under oath that we have the authority to execute this Agreement for Final Payment and Contractor's Sworn Release for and on behalf of said corporation,pursuant to authority granted to us in the Charter of said corporation,the By-Laws of said corporation and/or the Minutes of said corporation; and the facts, statements and representations as set out in the instrument to which this Affidavit is attached, are true and correct. SWORN TO AND SUBSCRIBED TO before me this,the day of 20 Notary Public, State of Texas (1.1h\ My Commission Expires: 07/2006 00700-B4 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ATTACHMENT NO.3 TO GENERAL CONDITIONS OWNER'S INSURANCE REQUIREMENTS OF CONTRACTOR 1. Definitions. For purposes of this Agreement: 1.1 Owner Parties. "Owner Parties" means (a) the City of Pearland, its successors and assigns, and the Engineer, (b) any officers, employees, or agents of such persons or entities, and(c)others as required by the Contract Documents, if any. 1.2 Contractor. "Contractor" shall mean the vendor providing the service or work to be performed under this Agreement. 1.3 Subcontractor. "Subcontractor"shall include subcontractors of any tier. 1.4 ISO. "ISO"means Insurance Services Office. 2. Contractor Insurance Representations to Owner Parties 2.1 It is expressly understood and agreed that the insurance coverages required herein: 2.1.1 represent Owner Parties' minimum requirements and are not to be construed to void or limit the Contractor's indemnity obligations as contained in this Agreement nor represent in any manner a determination of the insurance coverages the Contractor should or should not maintain for its own protection; and 2.1.2 are being, or have been, obtained by the Contractor in support of the Contractor's liability and indemnity obligations under this Agreement. Neither the requirements as to insurance to be carried as provided for herein, the insolvency, bankruptcy or failure of any insurance company carrying insurance of the Contractor, nor the failure of any insurance company to pay claims accruing, shall be held to affect,negate or waive any of the provisions of this Agreement. 2.2 Failure to obtain and maintain the required insurance shall constitute a material breach of, and default under, this Agreement. If the Contractor shall fail to remedy such breach within five (5)business days after notice by the Owner, the Contractor will be liable for any and all costs, liabilities, damages and penalties resulting to the Owner Parties from such breach, unless a written waiver of the specific insurance requirement(s) is provided to the Contractor by the Owner. In the event of any failure by the Contractor to comply with the provisions of this Agreement, the Owner may, without in any way compromising or waiving any right or remedy at law or in equity, on notice to the Contractor, purchase such insurance, at the Contractor's expense, provided that the Owner shall have no obligation to do so and if the Owner shall do so, the Contractor shall not be relieved of or excused from the obligation to obtain and maintain such insurance amounts and coverages. 10-2012 00700-Cl CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 3. Conditions Affecting All Insurance Required Herein 3.1 Cost of Insurance. All insurance coverage shall be provided at the Contractor's sole expense. 3.2 Status and Rating of Insurance Company. All insurance coverage shall be written through insurance companies authorized to do business in the state in which the work is to be performed and rated no less than A-: VII in the most current edition of A. M. Best's Key Rating Guide. 3.3 Restrictive, Limiting, or Exclusionary Endorsements. All insurance coverage shall be provided to the Owner Parties in compliance with the requirements herein and shall contain no endorsements that restrict, limit, or exclude coverage required herein in any manner without the prior express written approval of the Owner. 3.4 Limits of Liability. The limits of liability may be provided by a single policy of insurance or by a combination of primary and umbrella policies, but in no event shall the total limits of liability available for any one occurrence or accident be less than the amount required herein. 3.5 Notice of Cancellation, Nonrenewal, or Material Reduction in Coverage. All insurance coverage shall contain the following express provision: In the event of cancellation, non-renewal, or material reduction in coverage affecting the certificate holder, thirty (30) days prior written notice shall be given to the certificate holder by certified mail or registered mail,return receipt requested. 3.6 Waiver of Subrogation. The Contractor hereby agrees to waive its rights of recovery from the Owner Parties with regard to all causes of property and/or liability loss and shall cause a waiver of subrogation endorsement to be provided in favor of the Owner Parties on all insurance coverage carried by the Contractor, whether required herein or not. 3.7 Deductible/Retention. Except as otherwise specified herein, no insurance required herein shall contain a deductible or self-insured retention in excess of $25,000 without prior written approval of the Owner. All deductibles and/or retentions shall be paid by, assumed by, for the account of, and at the Contractor's sole risk. The Contractor shall not be reimbursed for same. 4. Maintenance of Insurance. The following insurance shall be maintained in effect with limits not less than those set forth below at all times during the term of this Agreement and thereafter as required: 10-2012 00700-C2 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Club 4.1 Commercial General Liability Insurance 4.1.1 Coverage. Such insurance shall cover liability arising out of all locations and operations of the Contractor, including but not limited to liability assumed under this contract (including the tort liability of another assumed in a business contract). Defense shall be provided as an additional benefit and not included within the limit of liability. 4.1.2 Form. Commercial General Liability Occurrence form (at least as broad as an unmodified ISO CG 0001 0798 or its equivalent). 4.1.3 Amount of Insurance. Coverage shall be provided with limits of not less than: Each Occurrence Limit $1,000,000 General Aggregate Limit $2,000,000 Product-Completed Operations Aggregate Limit $2,000,000 Personal and Advertising Injury Limit $1,000,000 4.1.4 Required Endorsements a. Additional Insured. Additional insured status shall be provided in favor of the Owner Parties on any of the following: i. ISO form CG 20 10 11 85; or ii. ISO form CG 20 26 11 85; or iii. a combination of ISO forms CG 20 33 10 01 and CG 20 37 10 01; or iv. any form providing equivalent protection to Owner. b. Designated Construction Project(s) Aggregate Limit. The aggregate limit shall apply separately to this Agreement through use of an ISO CG 25 03 03 97 endorsement or its equivalent. c. Notice of Cancellation, Nonrenewal or Material Reduction in Coverage, as required in 3.5, above. d. Personal Injury Liability. The personal injury contractual liability exclusion shall be deleted. e. Primary and Non-Contributing Liability. It is the intent of the parties to this Agreement that all insurance required herein shall be primary to all insurance available to the Owner Parties. The obligations of the Contractor's insurance shall not be affected by any other insurance available to the Owner Parties and shall seek no contribution from the Owner Parties' insurance, whether primary, excess contingent, or on any other basis. The Contractor's insurance coverage shall be endorsed to provide such primary and non- contributing liability. f. Waiver of Subrogation, as required in 3.6, above. 10-2012 00700-C3 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.1.5 Continuing Commercial General Liability Insurance. The Contractor shall maintain such insurance in identical coverage, form and amount, including required endorsements, for at least one (1) year following Date of Substantial Completion of the Work to be performed under this Agreement. The Contractor shall provide written representation to Owner stating Work completion date. 4.2 Auto Liability Insurance 4.2.1 Coverage. Such insurance shall cover liability arising out of any auto (including owned,hired, and non-owned). 4.2.2 Form. Business Auto form (at least as broad as an unmodified ISO CA 0001 or its equivalent). 4.2.3 Amount of Insurance. Coverage shall be provided with a limit of not less than$1,000,000. 4.2.4 Required Endorsements a. Notice of Cancellation, Nonrenewal or Material Reduction in Coverage, as required in 3.5, above. b. Waiver of Subrogation, as required in 3.6, above. 4.3 Employer's Liability Insurance 4.3.1 Coverage. Employer's Liability Insurance shall be provided as follows: 4.3.2 Amount of Insurance. Coverage shall be provided with a limit of not less than: Employer's Liability: $1,000,000 each accident and each disease. 4.3.3 Required Endorsements a. Notice of Cancellation, Nonrenewal or Material Reduction in Coverage, as required in 3.5, above. b. Waiver of Subrogation,as required in 3.6, above. 4.4 Umbrella Liability Insurance 4.4.1 Coverage. Such insurance shall be excess over and be no less broad than all coverages described above and shall include a drop-down provision for exhaustion of underlying limits. 4.4.2 Form. This policy shall have the same inception and expiration dates as the commercial general liability insurance required above. 10-2012 00700-C4 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.4.3 Amount of Insurance. Coverage shall be provided with a limit of not less than$5,000,000. 4.4.4 Continuing Umbrella Liability Insurance. The Contractor shall maintain such insurance in identical coverage, form and amount, including required endorsements, for at least one (1) year following Date of Substantial Completion of the Work to be performed under this Agreement. The Contractor shall provide written representation to the Owner stating Work completion date. 4.5 Professional Liability Insurance 4.5.1 Coverage. The Contractor shall provide professional liability insurance for any professional design or engineering drawing required by the work. Such insurance shall indemnify the Owner from claims arising from the negligent performance of professional services of any type, including but not limited to design or design/build services as part of the Work to be performed. 4.5.2 Form. This insurance shall include prior acts coverage sufficient to cover all services rendered by the Contractor and by its consultants under this Agreement. It is recognized that this coverage may be provided on a Claims-Made basis. 4.5.3 Amount of Insurance. Coverage shall be provided with a limit of not less than$1,000,000. 4.5.4 Continuing Professional Liability Insurance. The Contractor shall maintain such insurance in identical coverage, form and amount for at least one (1) year following Date of Substantial Completion of the Work to be performed under this Agreement. The Contractor shall provide written representation to the Owner stating Work completion date. 4.6 Builder's Risk 4.6.1 Insureds. Insureds shall include: a. Owner, General Contactor and all Loss Payees and Mortgagees as Named Insureds; and b. subcontractors of all tiers in the Work as Additional Insureds. 10-2012 00700-C5 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT CIL\ 4.6.2 Covered Property. Such insurance shall cover: a. all structure(s) under construction, including retaining walls, paved surfaces and roadways, bridges, glass, foundation(s), footings, underground pipes and wiring, excavations, grading, backfilling or filling; b. all temporary structures (e.g., fencing, scaffolding, cribbing, false work, forms, site lighting, temporary utilities and buildings) located at the site; c. all property including materials and supplies on site for installation; d. all property including materials and supplies at other locations but intended for use at the site; e. all property including materials and supplies in transit to the site for installation by all means of transportation other than ocean transit; and f. other Work at the site identified in the Agreement to which this Exhibit is attached. Form a. Coverage shall be at least as broad as an unmodified ISO Special form, shall be provided on a completed-value basis, and shall be primary to any other coverage insurance available to the insured parties, with that other insurance being excess, secondary and non- contributing. b. No protective safeguard warranty shall be permitted. c. Required coverage shall further include: i. Additional expenses due to delay in $TBD completion of project(where applicable) ii. Agreed value Included without sublimit iii. Damage arising from error, omission or Included without sublimit deficiency in construction methods, design, specifications,workmanship or materials, including collapse iv. Debris removal additional limit 25%of direct damage loss v. Earthquake(where applicable) $TBD vi. Earthquake sprinkler leakage(where $ TBD applicable) vii. Expediting expenses $TBD viii. Flood(where applicable) $TBD ix. Freezing Included without sublimit x. Mechanical breakdown, including hot& Included without sublimit cold testing(where applicable) xi. Notice of cancellation,non-renewal or Included 10-2012 00700-C6 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT (11.4\ material reduction—60 days prior written notice to each insured xii. Occupancy clause,as required in F, Included below xiii. Ordinance or law Included without sublimit xiv. Pollutant clean-up and removal $TBD xv. Preservation of property Included without sublimit xvi. Replacement cost Included xvii. Theft Included without sublimit xviii. Waiver of subrogation as required in G, Included below. 4.6.3 Amount of Insurance. Coverage shall be provided in an amount equal at all times to the full replacement value and cost of debris removal for any single occurrence. 4.6.4 Deductibles. Deductibles shall not exceed the following: a. All Risks of Direct Damage,Per $5,000 Occurrence, except b. Delayed Opening Waiting Period 5 Days c. Flood,Per Occurrence $25,000 or excess of NFIP if in Flood Zone A, B or V d. Earthquake and Earthquake Sprinkler $25,000 Leakage, Per Occurrence 4.6.5 Termination of Coverage. The termination of coverage provision shall be endorsed to permit occupancy of the covered property being constructed so long as such occupancy does not exceed 20% of the usable area of the property. This insurance shall be maintained in effect, unless otherwise provided for in the Contract Documents, until the earliest of the following dates: a. the date on which all persons and organizations who are insureds under the policy agree that it shall be terminated; b. the date on which final payment, as provided for in the Agreement to which this Exhibit is attached,has been made; or c. the date on which the insurable interests in the Covered Property of all insureds other than Contractor have ceased. (11.1k\ 10-2012 00700-C7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Cub's 4.6.6 Waiver of Subrogation. The waiver of g subrogation provision shall be endorsed as follows: a. A waiver of subrogation shall be provided in favor of all insureds. b. The waiver of subrogation provisions shall be endorsed as follows: Should a covered loss be subrogated, either in whole or in part, your rights to any recovery will come first, and we will be entitled to a recovery only after you have been fully compensated for the loss. 5. Intentionally left blank. 6. Evidence of Insurance 6.1 Provision of Evidence. Evidence of the insurance coverage required to be maintained by the Contractor, represented by certificates of insurance, evidence of insurance, and endorsements issued by the insurance company or its legal agent, and must be furnished to the Owner prior to commencement of Work and not later than fifteen (15) days after receipt of this Agreement. New certificates of insurance, evidence of insurance, and endorsements shall be provided to the Owner prior to the termination date of the current certificates of insurance, evidence of insurance, and endorsements. 6.2 Form 6.2.1 All property insurance required herein shall be evidenced by ACORD form 28, "Evidence of Property Insurance". 6.2.2 All liability insurance required herein shall be evidenced by ACORD form 25, "Certificate of Insurance". 6.3 Specifications. Such certificates of insurance, evidence of insurance, and endorsements shall specify: 6.3.1 The Owner as a certificate holder with correct mailing address. 6.3.2 Insured's name,which must match that on this Agreement. 6.3.3 Insurance companies affording each coverage, policy number of each coverage, policy dates of each coverage, all coverages and limits described herein, and signature of authorized representative of insurance company. 6.3.4 Producer of the certificate with correct address and phone number listed. 6.3.5 Additional insured status required herein. 6.3.6 Amount of any deductibles and/or retentions. 6.3.7 Cancellation, non-renewal and material reduction in coverage notification as required by this Agreement. Additionally, the words "endeavor to" and "but failure to mail such notice shall impose no obligation or liability of any kind upon Company, it agents or representatives" shall be deleted from the cancellation provision of the ACORD 25 certificate of insurance form. 10-2012 00700-C8 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 6.3.8 Designated Construction Project Aggregate Limits required herein. 6.3.9 Personal Injury contractual liability required herein. 6.3.10 Primary and non-contributing status required herein. 6.3.11 Waivers of subrogation required herein. 6.4 Required Endorsements. A copy of each of the required endorsements shall also be provided. 6.5 Failure to Obtain. Failure of any Owner Party to demand such certificate or other evidence of full compliance with these insurance requirements or failure of any Owner Party to identify a deficiency from evidence that is provided shall not be construed as a waiver of the Contractor's obligation to maintain such insurance. 6.6 Certified Copies. Upon request of any Owner Party, the Contractor shall provide to the Owner a certified copy of all insurance policies required herein within ten (10) days of any such request. Renewal policies, if necessary, shall be delivered to the Owner prior to the expiration of the previous policy. 6.7 Commencement of Work. Commencement of Work without provision of the required certificate of insurance, evidence of insurance and/or required endorsements, or without compliance with any other provision of this Agreement, shall not constitute a waiver by any Owner Party of any rights. The Owner shall have the right, but not the obligation, of prohibiting the Contractor or any subcontractor from performing any Work until such certificate of insurance, evidence of insurance and/or required endorsements are received and approved by the Owner. 7. Insurance Requirements of Contractor's Subcontractors 7.1 Insurance similar to that required of the Contractor shall be provided by all subcontractors (or provided by the Contractor on behalf of subcontractors) to cover operations performed under any subcontract agreement. The Contractor shall be held responsible for any modification in these insurance requirements as they apply to subcontractors. The Contractor shall maintain certificates of insurance from all subcontractors containing provisions similar to those listed herein (modified to recognize that the certificate is from subcontractor) enumerating, among other things, the waivers of subrogation, additional insured status, and primary liability as required herein, and make them available to the Owner upon request. 7.2 The Contractor is fully responsible for loss and damage to its property on the site, including tools and equipment, and shall take necessary precautions to prevent damage to or vandalism, theft, burglary, pilferage and unexplained disappearance of property. Any insurance covering the Contractor's or its subcontractor's property shall be the Contractor's and its subcontractor's sole and complete means or recovery for any such loss. To the extent any loss is not covered by said insurance or subject to any deductible or co-insurance, the Contractor shall not be reimbursed for same. Should the Contractor or its subcontractors choose to self insure this risk, it is expressly agreed that the Contractor hereby waives, and shall cause its 10-2012 00700-C9 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT subcontractors to waive, any claim for damage or loss to said property in favor of the Owner Parties. 8. Use of the Owner's Equipment. The Contractor, its agents, employees, subcontractors or suppliers shall use the Owner's equipment only with express written permission of the Owner's designated representative and in accordance with the Owner's terms and condition for such use. If the Contractor or any of its agents, employees, subcontractors or suppliers utilize any of the Owner's equipment for any purpose, including machinery, tools, scaffolding, hoists, lifts or similar items owned, leased or under the control of the Owner, the Contractor shall defend, indemnify and be liable to the Owner Parties for any and all loss or damage which may arise from such use. 9. Release and Waiver. The Contractor hereby releases, and shall cause its subcontractors to release, the Owner Parties from any and all claims or causes of action whatsoever which the Contractor and/or its subcontractors might otherwise now or hereafter possess resulting in or from or in any way connected with any loss covered by insurance, whether required herein or not, or which should have been covered by insurance required herein, including the deductible and/or uninsured portion thereof, maintained and/or required to be maintained by the Contractor and/or its subcontractors pursuant to this Agreement. 10-2012 00700-C 10 CITY OF PEARLAND SPECIAL CONDITIONS OF AGREEMENT Clibk\ Section 00800 SPECIAL CONDITIONS OF AGREEMENT The following Special Conditions modify the General Conditions, Document 00700. Where a portion of the General Conditions is modified or deleted by these Special Conditions, the unaltered portions of the General Conditions shall remain in effect. ARTICLE 1 DEFINITIONS AND INTERPRETATIONS 1.01 Add the following paragraph to the end of Article 1.01: The OWNER'S representative on the project site is: Cara Davis telephone: 281. 652. 1642 The CONSTRUCTION MANAGER is: Curtis Villarreal,P.E.telephone: 713.953.5120 The CONSTRUCTION INSPECTOR is: telephone: ARTICLE 4 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR 4.05 Add the following paragraph to Article 4.05: A Maintenance Bond in accordance with Document 00612 of the Project Manual is required for this Project. The cost of this bond shall be included in the CONTRACTOR'S Bid Proposal. Attachment No.3 To General Conditions, Owner's Insurance Requirements of Contractor, Article 4.6 Builder's Risk—Builder's Risk Insurance is NOT Required for this project. ARTICLE 5 PROSECUTION AND PROGRESS 5.08 Add Article 5.08: The Contract Time as defined in the bid and other sections of the Contract Documents includes a certain number of rain days. Based on the Alvin Weather Center Records, the average annual rain days from June 1898 to December 1996 is 40 days calculated from all precipitation days of record. The CONTRACTOR is required to keep a record of rain days at the site. The record of rain days must be accepted and signed by the City Inspector monthly, and shall be reported on the monthly pay estimate submittal. At the end of the contract, the CONTRACTOR will be credited only for the number of accepted rain days that exceed 40 rain days per year,proportionate to the original Contract Time. General Notes: Sections 00100 Invitation to Bidders,00200 Instructions to Bidders and 01505 Mobilization all make reference to provision by the CONTRACTOR of a laptop computer for use by the (11.b\ OWNER'S representative or CONSTRUCTION MANAGER. BIDDER is Required to provide 2-24-12 00800- 1 of 2 CITY OF PEARLAND SPECIAL CONDITIONS OF AGREEMENT this equipment or include this cost in the Bid. See Section 13730 for full details regarding this computer equipment. Section 01500 Temporary Facilities requires CONTRACTOR to provide high speed internet access in the Field Office. BIDDER is Requiredto provide either a Field Office or any internet access for this project. All other requirements remain and will be required per the section. It is the responsibility of the Contractor to coordinate with the Owner for all Traffic Control Documents.Contractor to coordinate with the Owner for procurement of Traffic Control Documents prior to permitting. Contractor is to keep a minimum of one lane open at all times,in both directions. No lane closures to extend beyond the defined work day. Contractor Will be required to provide an on-site construction office for the duration of this project. END OF SECTION 2-24-12 00800-2 of 2 CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION Section 00811 WAGE SCALE FOR ENGINEERING CONSTRUCTION 1.01 In accordance with the Prevailing Wage law on Public Works (Article 2258 of the Texas Government Code), the public body awarding the contract does hereby specify the rates shown in Table 00811-A following to be the general prevailing rates in the locality in which the work is being performed. 1.02 This prevailing wage rate does not prohibit the payment of more than the rates stated. 1.03 The wage scale for engineering construction is to be applied to all site work greater than five(5) feet from an exterior wall of new building under construction or from an exterior wall of an existing building. (Attach the current wage rates. Number the pages 00811-2, 00811-3, etc.) 10-2012 00811 Page 1 of 4 General Decision Number: TX130044 03/29/2013 TX44 Superseded General Decision Number: TX20120044 State: Texas Construction Type: Heavy County: Brazoria County in Texas. HEAVY CONSTRUCTION PROJECTS (Including Water and Sewer Lines (Does Not Include Flood Control) Modification Number Publication Date 0 01/04/2013 1 03/29/2013 * 5FTX0669-001 01/01/2013 Rates Fringes SPRINKLER FITTER (Fire Sprinklers) $ 25.84 16.62 SUTX2005-018 05/18/2005 Rates Fringes Carperter $ 14.38 0.00 CEMENT MASON/CONCRETE FINISHER $ 11.37 1.13 cLECTRICIAN $ 18.40 1.34 Formbuilder/Formsetter $ 9.83 1.69 IRONWORKER, REINFORCING $ 11.29 0.00 Laborers: Common $ 8.99 1.25 Landscape $ 7.35 0.00 Mason Tender Cement $ 9.96 0.00 Pipelayer $ 9.63 1.50 PIPEFITTER $ 17.00 0.04 POWER EQUIPMENT OPERATOR: Backhoe $ 12.74 0.00 Bulldozer $ 12.46 0.00 Crane $ 11.00 0.74 Excavator $ 16.74 0.00 Front End Loader $ 10.47 1.28 Grader $ 12.20 1.48 Tractor $ 11.29 1.45 TRUCK DRIVER $ 14.42 1.00 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. 00811-2 of 4 Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii) ) . The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. OFIA'cInion prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates. 0000/9999: weighted union wage rates will be published annually each January. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: 00811-3 of 4 * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2. ) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7) . Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 rihe request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3. ) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board) . Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION r 00811-4 of 4 CITY OF PEARLAND ADDENDUM Section 00900 ADDENDUM NO. 1 Date: 05/13/2013 PROJECT: Old Alvin Road Water Line from John Lizer Road to McHard Road BID NO.: 0413-50 BID DATE: May 30,2013; 2:00PM FROM: Leon E. Hoch, P.E. Civil Engineer Charles D. Gooden Consulting Engineers,Inc. 2320 Holmes Road, Suite A,Houston,TX 77051 To: Prospective Bidders and Interested Parties This addendum forms a part of the bidding documents and will be incorporated into the Contract Documents, as applicable. Insofar as the original Contract Documents, Specifications, and Drawings are inconsistent, this Addendum shall govern. Please acknowledge receipt of this 7s) Addendum on the Bid Proposal form, Section 00300 submitted to the City of Pearland. FAILURE TO ACKNOWLEDGE RECEIPT OF ADDENDA ON THE BID PROPOSAL FORM MAY BE CAUSE FOR DISQUALIFICATION. CONTRACT DOCUMENTS: This addendum corrects a discrepancy in the time and date of the mandatory pre-bid meeting for this project. Section 00100 is updated to read as follows: "A mandatory pre-bid conference will be held at the City of Pearland City Hall at 3519 Liberty Drive,Pearland,TX 77581 at 9:00 AM on May 16,2013. SPECIFICATIONS:. NO CHANGES CONSTRUCTION DRAWINGS: Construction Drawings on Pearland's E-Bid Website are re-issued for improved printing. END OF ADDENDUM NO. 1 [Leon E. Hoch,P.E.] 1 [Civil Engineer] 2-22-12 00900- 1 of 1 CITY OF PEARLAND ADDENDUM Section 00900 ADDENDUM NO. 2 Date: 05/28/2013 PROJECT: Old Alvin Road Water Line from John Lizer Road to McHard Road BID NO.: 0413-50 BID DATE: May 30,2013; 2:OOPM FROM: Leon E. Hoch,P.E. Civil Engineer Charles D. Gooden Consulting Engineers, Inc. 2320 Holmes Road, Suite A, Houston,TX 77051 To: Prospective Bidders and Interested Parties This addendum forms a part of the bidding documents and will be incorporated into the Contract Documents, as applicable. Insofar as the original Contract Documents, Specifications, and- Drawings are inconsistent, this Addendum shall govern. Please acknowledge receipt of this (1.11'\ Addendum on the Bid Proposal form, Section 00300 submitted to the City of Pearland. FAILURE TO ACKNOWLEDGE RECEIPT OF ADDENDA ON THE BID PROPOSAL FORM MAY BE CAUSE FOR DISQUALIFICATION. CONTRACT DOCUMENTS: Revised Bid Proposal Document as of May 28, 2013. SPECIFICATIONS: NO CHANGES CONSTRUCTION DRAWINGS: Sheets 3 of 92, 14 of 92, and 21 of 92 are re-issued and dated 5/24. MEETING MINUTES: Meeting minutes from both pre-bid meetings(5/16/2013 and 5/23/2013) are included. END OF ADDENDUM NO. 2 Cib.‘ 2-22-12 00900- 1 of 2 CITY OF PEARLAND ADDENDUM [Leon E. Hoch, P.E.] [Civil Engineer] 2-22-12 00900-2 of 2 ADDENDUM NO.2-MAY 28,2013 Exhibit"A"-Bid Proposal 'City of Pearland Project No.WA1101 Old Alvin Road Water Line Item No. Spec No. Description Unit Quantity Unit Price Total Price A.GENERAL REQUIREMENTS 1 01505 Mobilization(MAXIMUM VALUE IS LIMITED TO 3%OF TOTAL BID) LS 1 2 01555 Traffic control and regulation LS 1 3 01555 Flagmen LS 1 4 01563 Tree and plant protection LS 1 5 01565 Storm water pollution prevention plan implementation LS 1 6 01561 Reinforced Filter Fabric Barrier LF 11,950 7 01561 Inlet Protection Barrier LF 1,800 8 01561 Sediment Control Fence LF 250 9 01561 Sand Bags EA 10 10 01550 Stabilized Construction Exit(Install) SY 1,200 11 01550 Stabilized Construction Exit(Remove) SY 1,200 12 01570• Trench Safety System LF 12,660 13 01580 Project Identification Signs EA 2 14 02200 Clearing and Grubbing AC 11 15 02220 Remove and Dispose-Concrete Sidewalk-6'Width SY 980 02220S 16 02751 Replace Concrete Sidewalk-6'Width SY 980 17 02220 Remove and Dispose-Concrete Driveways SY 286 02220S 18 02751 Replace Concrete Driveways SY 286 19 02220 Remove and Dispose-Asphalt Driveways SY 164 02220S 20 02741 Replace Asphalt Driveways-See Detail SY 164 02980 • 21 02220 Remove and Dispose-Asphalt Roadway(For Open Cut Water Line Installation) SY 294 02220S 22 02741 Replace Asphalt Roadway-See Detail(For Open Cut Water Line Installation) SY 294 02980 23 02220 Remove and Dispose-Concrete Roadway(For Open Cut Water Line Installation) SY 199 02220S 24 02751 Replace Concrete Roadway-See Detail(For Open Cut Water Line Installation) SY 199 02980 25 02921 Hydromulch Seeding AC 11 26 02922 Sodding SY 50 27 02105 Prepatory Work for related to Underground Utility Construction in Potentially Petroleum LS 1 Contaminated Area(PPCA) 28 02220 Remove&Replace Existing Iron Fence(STA 51+46 to STA 54+35) LS 1 29 02821 Install&Remove Temporary Chain Link Fence(STA 51+46 to STA 54+35) LS 1 30 02220 Remove&Reinstall Existing Street Signs LS 1 A. SUBTOTAL GENERAL REQUIREMENTS S 0300A-ADDENDUM NO.2-MAY 28,2013 Page 1 of 4 Bidder's Initials: ADDENDUM NO.2-MAY 28,2013 Exhibit"A"-Bid Proposal City of Pearland Project No.WA1101 Old Alvin Road Water Line Clig..‘ B. WATER LINE IMPROVEMENTS Item No. Spec No. Description Unit Quantity Unit Price Total Price 02417 20-inch Ductile Iron Pipe(Class 52)w/welded 36"steel casing Ind Restrained joints,FKM 31 02634 Viton Gaskets&appurtenances complete-in-place(Auger)in PPCA. Excavation,handling, LF 184 02634S and disposal of contaminated ground water and soils is also Included in this line item-(at 02105 FM 518/Old Alvin crossing) 02318 32 02510 20-inch pvc water main and Appurtenances Complete-in-place(open cut) LF 8702 02510S 02510 33 20-inch pvc water main and Appurtenances Complete-in-place(auger) LF 339 02510S 02417 20-inch Ductile Iron Pipe(Class 52)pipe w/welded 36"steel casing Inc!Restrained joints& 34 02634 appurtenances complete-in-place(Auger)- (Drainage Culvert Sta 65+25) LF 60 02634S 02318 20-inch Ductile Iron Pipe(Pressure Class 250)pipe Intl Restrained joints& 35 LF 470 02634 appurtenances complete-in-place(Open Cut) 02634S 02318 20-inch Ductile Iron Pipe(Pressure Class 250)pipe Intl Restrained joints&appurtenances 36 02510 complete-in-place(Open Cut)-(at Walnut Road) LF 143 02510S 02318- 20-inch PVC Water Main Intl Restrained joints&appurtenances complete-in-place 37 02510 LF 2.018 02510S 'Open Cut) 16-inch Ductile Iron Pipe(Pressue Class 250)pipe Inc!Restrained ioints& 38 02634 LF 60 02634S- appurtenances complete-in-place(Open Cut)(by FM 518 16-Inch connection) 39 02635 20-inch Steel Pipe Above Ground(Sta.26+00 and 94+50)per AWWA requirements LF 338 40 02417 12-inch Steel casing for 8-inch SDR-26 PVC Pipe(Sta.61+90) LF 20 02635 41 02634 20-inch Ductile Iron Pipe(Pressure Class 250)w/welded 36"steel casing Inca Restrained LF 60 02634S joints&appurtenances complete-in-place(Open cut)- (Drainage Culvert Sta 68+60) 42 02534 10-inch PVC pipe include Restrained Joint LF 25 • 43 02534 8-inch pvc pipe include Restrained Joint LF 778 02634 20-inch Ductile Iron Pipe(Pressure Class 250)pipe&appurtenances complete-in-44 LF 315 02634S place(Open Cut) 45 02534 3-inch pvc pipe include Restrained Joint LF 63 46 02534 6-inch pvc pipe include Restrained Joint LF 787 47 02534 6-inch pvc pipe(Auger) LF 55 48 02515 Water tap&Polyethylene service Line short side(1") EA 1 - 49 02515 Water tap&Polyethylene service Line long side(1") EA 11 50 02515 Water tap&Polyethylene service Line short side(2") EA 1 51 02515 Water tap&Polyethylene service Line long side(2") EA 5 (1116‘. . • 0300A-ADDENDUM NO.2-MAY 28.2013 Page 2 of 4 Bidder's Initials: ADDENDUM NO.2-MAY 28,2013 Exhibit"A"-Bid Proposal City of Pearland Project No.WA1101 Old Alvin Road Water Line COW, WATER LINE IMPROVEMENTS CONTINUED Item No. Spec No. Description Unit Quantity Unit Price Total Price 52 02515 Water tap&PVC service Line short side(3"thru 4") EA 3 . 53 02515 Water tap&PVC service Line long side(3"thru 4") EA 1 54 02510 3"Wet Connection EA 2 55 02510 4"Wet Connection EA 3 56 02510 6"Wet Connection EA 4 57 02510 8"Wet Connection EA 8 58 02510 10"Wet Connection EA 2 59 02510 20"Wet Connection EA 2 60 02540 16"Tapping Sleeve and Valve. EA 1 61 02510 Cut,Plug&Abandon Exist.12"Water Line EA 1 62 02510 Cut,Plug&Abandon Exist.10"Water Line EA 1 63 02510 Cut,Plug&Abandon Exist.8"Water Line EA 11 111117 I° 64 02510 Cut,Plug&Abandon Exist.6"Water Line EA 4 • \ 65 02510 Cut,Plug&Abandon Exist.4°Water Line EA 2 66 02510 Cut,Plug&Abandon Exist.3"Water Line EA 1 67 02510 Fire hydrant Assembly Inc!6"branch,gate valve&box complete-in-place EA 35 02514 68 02200 Remove&salvage fire hydrant EA 9 69 02530 Remove&replace 20 LF of 12"SDR 26 San.Swr.Centered over prop.WL EA 2 70 02530 Remove&replace 20 LF of 8°SDR 26 San.Swr.Centered over prop.WL EA 3 71 02541 20-inch Butterfly Valve complete in place EA 17 72 02541 Air Release Valves on 20-inch Steel Water Line EA 2 73 02541 Air Release Valve on 20-inch PVC in Manhole EA 1 TxDOT Elevated Water Line Crossings Including Drilled Piers,Box Beam,and Appurtenances,at 73 Specs LS 2 Mary's Creek and Town Ditch See TOC 74 02200 Regrade Existing Swales and Roadside Ditch LF 4,685 B.SUBTOTAL WATER LINE IMPROVEMENTS S 0300A-ADDENDUM NO.2-MAY 28,2013 Page 3 of 4 Bidder's Initials: • ADDENDUM NO.2-MAY 28,2013 Exhibit"A"-Bid Proposal City of Pearland Project No.WA1101 Old Alvin Road Water Line C. STORM SEWER IMPROVEMENTS Item No. Spec No. Description Unit Quantity Unit Price Total Price 75 02220 Remove and dispose of asphaltic/concrete surfacing with or without base,all thicknesses SY 6,400 02220S 76 02980 Pavement Repair and Resurfacing SY 6,400 77 02220 Remove and dispose of 18-24-inch RCP All Depths LF 86 78 02220 Remove and dispose of 36-48-inch RCP All Depths LF 942 79 02220 Removed and dispose of Sanitary Sewer-All Depths . LF 20 80 02220 Remove and dispose storm sewer inlet-All Types EA 13 81 02630 Cut Plug Abandon exist 18"Storm Sewer EA 2 82 02630 Cut Plug Abandon exist 24"Storm Sewer EA 1 83 02631 Type"A"Inlet on 5'x 4'Precast Reinforced Concrete Box Storm Sewer EA 12 . 84 02631 Type"A"Inlet on 36"RCP Storm Sewer EA 2 85 ' 02631 Type"C"manhole for 42-inch diameter and smaller sewers EA 2 . 86 02542 Precast Manhole on 5'x 4'Precast Reinforced Concrete Box Storm Sewer EA 4 87 02630 18-inch diameter RCP storm sewer by open cut LF -10 Cillib1/4, 88 02630 24-inch diameter RCP storm sewer by open cut LF 95 89 02630 36-inch diameter RCP storm sewer by open cut LF 285 90 02630 5'x 4'Precast Reinforced Concrete Box Storm Sewer LF 810 91 02630 Pm-Cast Junction Box(See details on Sheets 45B and 45C) .EA 1 92 02770 Curb,Curb&Gutter,and Headers LF 140 • C.SUBTOTAL STORM SEWER IMPROVEMENTS $ „ _ t D. EXTRA UNIT PRICES Item No.' Spec No. - Description Unit Quantity Unit Price Total Price 93 02318 Groundwater control for open cut construction LF 500 94 02541 20-inch Butterfly Valve complete In place EA 5 95 02220 Additional Removal of Concrete Pavements,With or Without base SY 300 96 02751 Additional Replacement of Concrete Pavements SY 300 97 02220 Additional Removal of Asphalt Pavements,With or Without base SY 300 98 02741 Additional Replacement of Asphalt Pavements SY 300 . 99 02318 Hand Excavation CY 10 D. SUBTOTAL EXTRA UNIT PRICES b ' C. TOTAL BID PRICE = A + B + C + D $ 0300A-ADDENDUM NO.2-MAY 28,2013 Page 4 of 4 Bidder's Initials: . I./....) ./.7) • • Gana to CMS IFILI.U.-DLNC-CS _.C.ONSIELIC1 ION EMILE slot,.srKCLVINS'FNCI ION M;TfS ';L?REE1 JEJS,ICE ANC nI.0 1,5_-may - WAY Nnlf IRu[I nesTLvaRR Cn[[+IM STSIfI.S .ifR 4nL5,SrOrle WlANnpl P.Sf11U' xxl.�I�x[SPW6INILI IT d L[O+fxnL IIN IL Cf`L . -1AT(SI If411I WY.E rE VUH(n'IOK,_�v S.wWLI C'tA I Iv lilul D [ _ult SlLCUICl,In'1S r CO Ov T[L1r 0 LARN1n `FPift i15' C fLK lut ,U 1• S'D YnC 5 I s' 1100.1. aNll V I Iln>1:.PrIG C,rL WM LP CONS., ] IL NIMLLLAD(I C"LLWED IS' D,A"`i[Ir Ill[ I dWAnLF I In CIIN d" AREAS rm.ON P✓M Alain Br I'L•'C.Cl.I nRNS v`I.ACLcDxS 1 VU! A a..7"LU U IAIL IMIM,w1U 6PLC11 ILAI 5 AS.11.CAN.E Iel OSP..nil fn1Y COSMOIED 0 NO1.LL`I,An O.O11a11LRIM' ]O ti PC< If n 'i<f IKN <nAt <M' TI 0 C I 4I II EIp[""N"eyr`LjxlinwnxlifPF'XNS L dP' 1 1PLD WhfSS SNpw UIaLrIu:51A ,xINGs. �<nOCIM Del.',POUR 10 MI.num.O �:. F IIn"-s cn�ioa rc At c I L p 8ma m 1M xE rs J•• Ie1,LZ2V✓K:t L Bl''Pr' FKO NIw L.INA A.101LRt PROI wnvIs Iv NW"` ill nJ'Y Ls e p OEM. au N '[G JI 51�Wt D [s U . C[5 0 E WC Pn N FIG.i Anf CA•CO In 1AllU.NO LURB .L.PRCvVC Bt..N MALE Unutt r,x[[ vi`` JJ CC rw /ON All -fLRO N:"IO W UWI wLL <IfWN lnn f fx, ,.. �1 C 6 O[s S pn LlSI fW rnVP.ICFIG.DU. !L00010U b'"Cx rfE.IN]Lu0 rF 1drGEO TOR LEADS NC GiuIM,SIRS enIN. rv.¢n Lwr rfwsrnueuM IS C.I.lrn u Gutlr.'tPm nn w c t'N, nrt n b I wm.,cEPn,wrn �[Nd,rt[x,vrcs "xnan"c.rc,Ifp as p NLcID u.,rrn•T.wviM r•"1iH sin sue IrN. nu 'rNl MO II)n P]nl I uc M. Y, 5 10TRINCLL SHIM. HD.01110.CDST WI6PIVn^',,W;:xLCN tE 11N[DItru'C' /•rum,Fa,M Nlx,l Irn I rr1461•5,Ni IIfR S.JI,< FrLi I01110. J raslwL VnwNln S'VeCf runs_ C v( p RV SIN,DMD QIRIL 0WY11E0 . c CLI.PG(0 OF VUC N1NOr Cerro D all,NDH,nI[OfN Df, DIv CIS ir[r. ]Y•-65]-EOO,r� e. r , ro s vuy O[ I , .. V[ C CWVTw ,ALL GI REPLACED ,W BYi'CCI ILn51<tl OWt9 iVnpN 10 C0. nr.np CUN.1 iUtIIpN x eM nlKn M.4.[I I N. fli Tu:[St u[n4aN0 SI'�11D.n05 5 C of fM .c[ ( DV VIV CUMry nl IIuwS a,Rwwr,CATTI ulKw eu�1I,u.N.SPIMIAL Py,n di µle.gni l90. 1 d `lu.'vin�ar s1xUL1UAI I. L COxSt Aia(l Yl [51(NL 10 fUSilxG •IC 6 'WeIT,aL I[ _ W,wt. , I l US rsn.ulll¢`'cn•«,r¢D u�wDxi lr.i.irElsD TNAFf IC Nall-c • .n g11!°,u'. 1:Lrl4'1Yp".w"e"I i l.“-l' '[r'd" G C9nr(uC1 W1 AW1I LUJ Vn IF Ln IC51 Utlyyx I1llll OSx"HLSUL wy nl,p,(E 1 p n[COOS..00 V.I.I.Ol00 00.61rax,W.�1rr. fpnW llOn PRIOR rC STIQ'Ix[MAN ' " (dNrfxwyl %kal. ANC L,aLIC�• 44 CIIY+r I'1p llN6 1 1UV.COOS M DO LI,N I.I./1..1 INC C GiOf nAi14 A.cIIIn IIDNs W"iil"Clir[jr PL(10 00 C[WiKKe 4Hv00,+1 O SU"r[Pxm•[`C4[5 Ya.L I.CM1gcCiM SHALL nOvltt nx0 Ign�l:DENIMS L'W'GHNUCf .E.RI[.DV.NO) 910.1.BO D NI.10 nl Ail uNIS WmNL ,[`10000 OP[Ylml Pf s•LANS nI'd'Cx Cu, I (n Imn.. HID.PMI v1 M 1C TCnS RFmOat nlrnM TNilFIL WIRO. ,:Ip.ANDµ .111IC Cn<CPf c TO Ox E diaWvlCS OC In oVO,., 1....11.11. K(rc DEVICES,NSIMI xCl[4 POST [ENI EOI110w Silo lEc1S'IfwSI 6'LADSO MAI.CONS...MD.9 BE RES1pV0 TO Tor ptir,il TR: 4[1k C LVZ1V.5 Or BIXif N,S IN,N'IO n„1.1.TI:+NT[nl.'UI CPIS11M,NMAn 11.0 PA[11.111ES Hr.BED,'PLO,MO Fn. MINING GMf1M[l llri N [AflIAND,flY]NCCn G "'ROYAL l v 0 x rc'rslIrvO 4^..HVA.CnW1 d'of D¢a. 1 .Tv E EL..Ian I�"N--.(..f6L11.1 Irk- rC0[PTId+.Et SHALL LE D 6[NI'OSC I w! CIVO 51Lll Wi 11pPO510 LAYIED MNf. [.Sfr.(Y. [II O^.Yinwl nl n _ - C + x A C(Gv 10 ALL dltKwrS,C (si Iiiti.Sl Eq 4TPIi( t(rN 11LL �'� �L vRS a4.4 iNw ne<Npl r.6110...OF 0.YLo PANG I DES 110FN71 RLt At ALL 11HE$. A WaER[Iw E xC ar�yrORCwO S10El[nSti US I,(AI..WTpt OOtrL4 EE[S iluAl[U lNOu 1i.( [F`Oi Int 6LI"ewu4 livCS i`�I CnAI[O.lui arc, .rt[ I, Or RE C 10 C.V.. N.ARM4A.DORMS Sx.LL BE 40 IBM5.I�L.G.1:C-C 1RF C <NA Mnl`IAIN 7.-nrRgt RVF.e Bt M'CQI01M lC W 4Lm MIn ra14012 B--IWO Sir 6NTFR Or MOTT.SLAB CYDfxrlAl.RCnS A.10 6E SODOED TO N.,D,CNSINIL,AND R.OIW.P ARGC AflC TO.DC cIJK RU[IIOv • rnMrlC[d,litW li•AVI OunIM xlxG In^. -p NOD'OR[Ww %r4x0•mNAU[ll. . 9.=MIMLTOF 9uLLLCDVER 00EN CACAVR110xS u.1N I'NINASEt 5 COnixn[+OO TC 000.HECCSS,RT PR(CAJllOn6+C Px0IFC1 ERall YcwHCNLT[ta V"vcuCNl. t rS 000000En PROER.Du0ING NDx:v01.INO IMws. �N TE NiPL�t SI DlLlilE�fHNn01 A. • SMIL r0.1 4EM. 1 IC VHEN LAMS ARE BLOW°. [L 1 Sv5LEu5 0'9.9UB5.PLu1 5 nxD raCCS ALlmu InE MU Dr 1ZAvnCWn Ie PI C[r xn t.,"Nisr,, PnNl°21,1+RJtIVe aaei,Y)T'IRx ZW"`en"'"''''' ;'+'ALL' nE fLvrRACrOR A1ALL COOPIT w0N OSI'A WCUL.NDNS'.HD Cra iRAC10R 6 NCI WN4JN)rn In nTR.lr M.11Yf n D VIgTLN VA',.Vri.CMInc1 p"r •iT UnlydvCO VOTiCE 0FT1[LN15:/f IAGGEg151 IYPrE A MO d'1[RnS.lnll_CnCCNnwG[nGVAnd14 IxCnCnluV RCOUI2�10 OIMCt Tnn ,tEn nnEs,RC ROCx[0. 'AA<nMwL P L 4t5'DCPN+u[I„Ai]D1-d4]-tOWfOR nSdSIANC[VO I[ONrgAC1M 5O l GTf.nM A<l•(�.A O.mAdxG C415tv,L mn`K.AIt(LVI STSrzus I!O.�GFn 6. •IF 1 LORINntld.CNW.S -U UST R U5.rel4Nt 1.1 lx ' D _r[P un' I MIL ItY NCTFS TRAFFIC L.1006 P.a1s• III UST caNs7nucl mei lww.6. iY"c[t O vlr"nuo to niu a r s 1 7 t �c f _•„__•.•- ._ _.. Is OUTLINED .C T.01 11.11.AS.CLINE r.vYL OS rr� N.SVING f III P..Al.SUV.11 Rll rC DST EP P PNS• 0 P CC nifnstu%Z.4f a ( 1- "S `•�� _,, I TaL",a,x4,,,[�.t � C�f iO K.NEVIES ONCllinr CON P.R..VTEn 1.4 BnrS PA. Ir OSLO is LRCM..ON Uv wL,O[ U,1f5NOf SOPRON C U �E [ R11 �RHEnin `mow; AME...H.-MR OIN NE� 31 I•s. ,nle�i+(IL 1.inti vW.l C ER:ONLTieC"OJ 1 v SNOWn EOv+riCSC IXuvl.,lGSEnwc,,.,0 .II.,,.,.i-BE.Olt.otail�.••••""l f6POrs1a COn �"r •T.ESFMR� 1 E NEPHOn.CIOLC L LANv RLWI4.En16 d NU IL l..I.SM.29 ., Nr�1LL axl es lrE COxtgaC.]F g E xnS.IP 0m1.WF,T 0....Ac:Or } 10. O 00.1.Ann CO..•�g �n ALL Or la ).MPRN•EO COP IfUs OF•IRArf IE�cONIP0. LRNS'�Lp1vE/�BIDf'v4k movsl Or I. I. ,sWE Yale ,IL,Tif. IN9P[ei10n,I :5. 1 .L.T.C...51 attn.•l (F..PEm.11•TR. +� - r�A9 9uLlulN[�,(LL A Rx fn,l,n CITY•5 TRPFFIC N•,w^hn Rl 0*0 t xa1R 0NE11 00 0CLOSING P Srt � �I� A 1../510E11.1. II. [�uMir�.rrN l`'ST OE MOS AT LENS TIC ILL OUSIMSS n00 "(01 n�I51WS�WIgiWICBOv1O. 000a10L NOUHS NAT BE RCSTRIGISO OIN .111.64 TNE REOI0Si PAx OE DENIED.IWO ,. nE*(0 Iti_ m,aa•Is GLL]1]-Y3,72.1p FOR AN MPL.IGIION. •r ilst 14mr m,"Z w IIw rrg.[u SWvrr IIN. 0.NE.Nm] s/]a JH LH < mNfN0S.HRS.VR a'A.IE INACS...wt. pI.IU. 6RE/'mml"",D.`C.P.1 0.1 UP PUNK6^,01av5."E(sINSERI.6 _ COIISiWC110"U4.01.FOP V.LILII.s.S e6 ULn,N( n61.x. LOI xlcElfa LIB,w6ipw uacju eM ISiRCf l a1.Nu Yf""rA P • • uoii'i6ic�"..S • '11gf!a.164.71 • ' Tepn•/(iL.,IL 5/0/2013 CHAALCS 0.ENGINECERS. TONSULTWC a WieriERS,0.'C, TO.Bp.m n PRwEssonn C• CNpncr,(51.6 1JNt1.1.15 RCA" ytr.A ID3)rei3-bet TO51 p,JlyNM,• D4u> • PEARJAND• City of Readand,Texas • - OLD'ALVIN ROAD 20-INCH WATER LINE . GENERAL NOTES,LEGEND, AND ABBREVIATIONS N=4..111. 291.cA0 N.t SHEET C.• San,- NO BCAte 3 c mL,Icel.P.E 00 v] '.1...") l--) . • • l EN UGEfl "' I-20"x6•TEE I-20. 45' BEND I {a 105' 1 I ;g -� A 23•B4, G-TOT XIS ELT I-6"NIB, BL STA 24.09.60. l 17' �� 0 n1 TO EX 6'WL BL STA 24.07.30 ° 1 39.OL1'-L7 105'DRAIN• EEASEM N r ! �•'-1 rJ'r 20. I4 SLUE:Kpli i_y ta' ° I BATENAN PLUMBING COM NAY (VOL.1 5.PG.'17.318 BC R P 8 1.20"X6` TEE 1-6"x6` EE °"'' t a.uoxar„ G I S{ D; s PROP'20_MAIER INE 1-GVtB LEGEND VAN•rte f"fI t-6"GYiBI 1-6"45'°BEND I,:�Eoo.°°a�oj1+M'tu��i,tti•c°Ux w°.r 1 �- 6� = `s;' S I - 1-FN EAST ROW (PROF! 19� W • I 1-6- I ((mT 22 ,. Y { L g'qR �+ L - __i_ _ BC STA-2T SD --" WEST RON lPROF1 --- In C AN BL STA 2•BO .3 ? C,2 as4 Rs9�` '.`c - LOVE AND REPLACE 79.00'LT EAST DITCH IPROF) _.___( E ,N+ 1ST 24'RCP II RIP AP. 71 JJ,,..se.10' L. / . . $ ..I .. _ - -- - 5 pp W Gb� ® GROUT AS REOUI REO AT NEST DITCH /PROF) -- I_ me urx. F ° ° EYIST•�-Iw 1°B tl[nA _ LA. �® 01.8 Y6 CONNECT ION US UNE 1 .w TOP OF PAVEMENT a BASELINE F r __ _ P 8 RR ' j D �S I s r 4 L 1- _ - _ - ."_T�_ -.- •,o_. - -•.., ,. • a°�1E�. rt .1'to o. ,,,,,a, - NG.a PROP WI. -- •---- 2.,6'•1.5• BEND :I - s el N0 c.*I0 __ __ _ _- AI 10'01* ,s"PIF0000 OL° WATER METER/SERVICE N_ _ 4_ I i I000•s•o-•w°Ic TO BE TRANSFERRED ,mil l-°n-•0F CRITICAL LOCATION _ - BEGIV AUGER - SEE SPEC 02318 °^�� ° 11--_-nY„ c I I -- f-•-�<=-- tot'or 0o COW7Rgt B£NCM4RRr CD c) F 43 ° P -�- -'- F. ro-{ TEE ELEV 7ED CROSSING I --- U �///- - -.- BEING A METAL ROD STAMPED"xGCSD - -sz- / _ DETAILSy MEETS oIxx {_ _ / �f,Y® - N 0.2•/-MILE WEST OF INTERSECTION M,� 1000,°„ - ,/ - -- T1 1 I.1 ~ =-- 76 1986"LOCATES ON MAGNOLIA RD N f° ,--- - -- -- R caw°ANN Ip , c000011...NE -- ----I °0n ?c v1 _ - STATE HIGHWAY 35 AND MAGNOLIA. L./! ///ry p+rnw�n ENERGY - Ip 1 I I BL STA 27.00 /// Q 0 0�°:E�.1' OLD ALVIN ROAD1.Do is PCCOnE 25.00 IIV N 2• B9' 57.23`N 26.00 I- el �T•00 39.00'Li 29 Q ELEV. 46.OD IH.G.C.S.D. 1987 ADJ.1 f" I lee°-a+n-00001 n BASELINE 0�° $I 4.140.75• c cnEIC BRmc[ El I. { w,�c wuI N ' WIN+PAWNER, O`/ m I 51 I 1 W ''M MAW M /, TBH oA41 91 'I IY LOCATIONS OF EXISTING UTILITIES Z ratan [•20' 45' BEND�.--+' _ ij // auu ERN CONCRETE nE.o uE aLR 0 PAL �_ L .Z. ARE APPROXIMATE ONLY, r-c-.. -BL-SYA-Za-2,94 -- c� '. - c�T "0. -p - CO.. _ . �, / 4`V"r c c�� C mac-�°RTin -C-[- <. yu 4-cam .L_.T_t___�- -------�C.-s- -fi- J 2.SEE STREET.CROSSING DETNLS J 35.75' RT - G_ - Ic r I v`TVT[ { 11 �NU_�� _'-- SH 39✓K 41•TRAFFIC:CONTROL U ___ _[)F -�- slat �\ I ____• E I 1--______ -....�.., - �� S _J 8.., PUNS AND MAILS. -" l- ww_:- __ --rr- .,+r,xAO...L one s/. �a_e3•:� ----1 1- .3 I 5' �_.e ��� CO. +[ --------�Boa 'L�.J, -C�Q ri>;tt • 2a t 461 eA.rt wL0 v I \ I 1 '1E.,I `, • to.. P-{ 5 P P _ NE ¢ _- R Pis,w°u.w v`,-2%• S euL[In[TrRa ii°rmdNo cam .PT 116I1 e v r®c, I CRITICAL LOCAr IoIiJ, DRAl1�lAGE EASEME T I /y� �• ~ I I 1 SEE SPEC 0231i I No OE WEN INIC -.a VI k rovvaw �i�. �2D�7�6•�426 BG,� I I I re0�R \\'Qr PRIVATE UTILITY LINES SNDRN W ° (PIN C PERSON.) 1.00-645-66cM- u \ J I g N1 U --1-- - LOPR'NM e �� W I 7 GUNGE ttvu+x iR r CC tERR01 NMl NE�G�//ELSE LCi iilij�wiji'w�[v 3 2 L. 2 -f qe , I :o 8xYI r�gl I W)d1o,1°PI ,e.,xa RIM. 1 k o 1.711/I I I o 3r1 al al j ° fI I Il •- S.°R�°..l:'FINOWTT.aal,[x1Ll„tjI I pI (BANDONEXI5T6HATERLINE s w °p 1E. °� ND TRANSFER SERVICES TO PROP I Date /YO`WATER LINE //( • CnTRF0I NT EEC RZ Yo 1'FA[ILIIICS 20•STL PIPE o°.« •/A''/ / �. /J���,/ /;,/ ENTIRE DHLNYTHE 100 DEAR F ELEVATED CROSSING. ••. EDncps[CABLE[onanNY . ... ; ., - � /%/i</ /'/ : NOTE: :AND LIMITS ARE OUPROPOSED WATER L TE0ANDHEiPLAN ARE. / DOD PLAIN !n AOOENOUM 2 5124 Jx LN ON 52 ,/ // / /A / /%/' SIOERSLOPESTi1+tSIIIpEADE THE PLAN MIEN. 52 - [AIR RELEASE-VA[VE - ,. .• 5• 7.7} /// 'BENTS'EFFECTS CON THE 1 • BOY•PIPE ELEV- TT: T;5 J YLOIP#-7NE CHANNEL. VERSE ELFECTS ON TxE7 • ® 50■ W INEI et oLSCRe WE OM►IELj _ _ FL EAST DITCH -- 4B II' (PROP 20• -FREEBOARD . ....:.... .. i .,.1(X)YEAR w5E 46 : � 127' DRAINAGE A MAINTENANCE EASEI4 NT 1\ `�_ 46 �i)y ���R .. '1 2O END _ . auL 5/6/2013 I I - i BEO1N 20':RID-END STL P PE• WEST ROW . .... ELEVATED CROS H ... .. le CONs04Ru Two EENGwE[R9•Dit 44 Nc a PROP WL 44 MIAS BOARD OF FFRESSIONAL .... 2<LS RCP - DROP 6`HATER LIN\ ..O IA ) ' o [NRRC[RS F-4116 • 1 ' Y INCI ROWER ROAD:SAW A z 42 - -� - ' -6`45••BEND I i I 42 - TOP47,710:.._. : [ 1 - ....-. ...... .: ;.... .Ex1S7 6r.,L�______ye-_� / T�3] STORM M 24'(NE)S2.8f1 ���A��`I_��__ -,���- - 6` Fx LEAD ,STOTA7,27 '24-(Sw)'42,91 �A,� ... • 1' MIN CLfl ....� ... 1'Y1'MIN' ( '�\�. t41Li atilaR1 ......... .. \_/''(\ram. .. / 12•(W)42.92 REP 1 �4. 1 e'....L q �/�)5 TOP a523 J•'•V 7 •24•(SW)42.5n 111111111,r o -- .. .. .... ... ... , T...t::.:e:•O� City of Pearland,Texas 38 Za"(sw)4z.54 LiRGP •!Oi040e '• 3B OLDALVIN ROAD 1111�� 1•••••,1•••••..••.....•4T�!!I�i�•• it ... ...:.\ ..,... ._.. \ \\ 201 CH WATER LINE . ••.••••••••••••••••••••,•••••.•• ••4•. _ PLAN&PROFILE °�4 •40 •! •044•�4��4i:�4�i 404ip:14i�4 •: •4�: STA 26.9P END DIP ALONG BASELINE 36 .••.••4•••.••..•••••••••41.•40,•••••••4 --Exlsr sD R .•.•.ww•.H.•.•.•.•.•Aw.•.•.4.•.•-•.•.•.•.••I• •.•.•.•AAD E ZO-45'BEND Ia o-4r BEND ... ........ .....-. 36 45 :f `tlT CEN TERPDINT 4-GAS 1-ZB-BV END NAy 750 LF RESTRAINED.ID N15 •uwSTA.P3+o110 00�0 STA 2B+00 SHEET • BL'STA'N:00 i .. ..... .. ..-. ;..IBL'STA'27L00' \\ SDATEs w , 20 14 L _ jN 34 BEGIN DIP/MIN 330 LF'RESTRAINED JOINTS 45• BEND \\\\ \�\,-��.� ��` 34 ["Z' S: 23.00 24i00 25.00 26•00 27 00 28.00 uo.loannIRAILPE�" Raw OF 82 '•741) . ' //7. CONCRETE ////1 i,lrvuixll a is 4Ian TO ss0 /(♦ / J I STOP N GO wW%EIS Or tErAS,mL^ ELEVENTH NCS REALTY COi1P T / yl• IC••1H•° 0 Al 40 ATL a 14 PG •1 HCOR / _ ° / ,03-20-19B5 / / / / ,P,,, SrwCE nan -00' EAST RO/ (PROF)LEGEND / / • / /• // / BURGER MOLD KIN s / / / / LEST ROW (PROF1 / / .. / / 1-20"X6" TEE RECONNECT TO .d} �. + /j _ T-GYLB EAST DITCH (PROF( EXIST SERVICE,/ J,�,. TwEE7Y MAR EE7 --- t-20"X6"TEE /CRITICAL LOCATION nN I-FH •'^,(,°�•I° LINE /' '' I:OVLO 1"y0�B 16.1`f'E`'"" BL STA 59•95 REST DI1CN (PROFI -- P •arMALT 1.10"CVLB /• SEE SPEC 02]ID CRITICAL LOCATION / T �, I-H U. 40.]0' LT OP OF PAVEMENT•BASELINE c _`°, r• IX VA 56.80 I.45• BEND /� Q1°`E YiKr SEE SPE�cN 271E �/ , - \ �saTAt I5.70' T BC STA 56.95.00 / �, ,47. . G O 16.30' LT n ; /'g°•• EASEMENT 7PRhP • S. TO BEM ESFERRE ICE u Or .swar � �/ cm.rA[rt Z__ - -�. TO BE TRANSFERRED O .. // �`. r. •c•� - - =o_ _00 Ct7NFROL BEMCMNIRRT %+s•• - BEING A METAL ROD STAMPED"NCCSD LD� ° ,e4ro <, �,'-+ � _•__� f BASEI INE� p 76 1906•LOCATED ON WONOL IA RD LTY PROPZO-TWAT ER LINE !•_-: ••�•_ _ mr[aw•r[NOV �r�^�r'9i _1p _•-•�_ a•sL cs uve Or-VA-69-+-]tiaT',,-L,- - O.2•/•MILE LEST OF INTERSECTION "4 °/ 1-I6"BV - - --- ,a+.rta TB,/0Ax Q STATE HIGHWAY 35 ANO WGNOL II. t- L� '(FIN Nrnl • NO-JACK CASING- BL STA 56.95 F.4 a T urca av4 RESTRAINED STEEL OISINC/ ND 5T[FL CASING ELEV. 46.00 IN.G.C.S.O. 1987 AOJ.I W N 2• 00' 40.6B-L 13.34' LT /57.�'>• wNs p JOINTS A NETTr_ 58.00 1• a. 59.00 • 60 W J I.442.6Y' BASEIwE•IE%I STEFH SALVAGE r-,S" ..... • �a�l OLD ALVIN RDA, // ' "`(r c 1•AROE LOCATIONS OF EXISTING TW7E ONLY. UTILITIES 4,1n lN[A RANT � ,• a •',� ° X 2.SEE STREET CROSSING DETAM1S _-LIP 01- _ RECONNECT TO = SN 39 k AI•iRAFiIC CONTROL CJ c z-- ' •'Ir /q c[ /� rEXIST 2" U PLANS AND DETAILS. Q -�i or�.rcN _ T _ •\; ,� ` _ � ` SERVICE LINE p t'- c�r�f nmc..- «�:WEN e1"41•a iffj h\' `, \ ,`'°-a-[a'e,n / \ 11 ..."muu`,°p'wc°" r s NOT:Ir.,o,N..v[¢leer RESTAURANT c"•ET K ., T r[ � / ss 1 1[• u [ 1w 1N n •c•u[•aa, S[ P �' P_• y / ..•$1`N--, I I - cmvL•sONN<U I 1 I w Lot PA°r0,1r1ap,rin m..ti CUT, PLUG cTsn 4•s infA -� • PRIMATE UTILITY LINES SHOVN L ABANDON / �I -16-%16-TSAR �'� ! lg7c�-pc c s_ l BL STA 07.42.00 IV/ ' r_ __ o Mc�nr"u�nN`s'a.c ABANDON EXIST B•RATER /x L 16.30' R7 __-_ " Dole ® CCNf ERGO If0T E0IfRG./ELEC000IrACIL 111CS 5. aN,,,, 1UN„ J1ROP 20R SERVICES TO AL STA 57.30•L7.]5'LT rO,,,,,"';�`ir I'�.1:LtaC•�:� ABANDON EXIST LATER LINE, 1NLo•n[m[w °/0/•stn.. scn,or[a DROP 20'WATER LINE ®BEGIN JACK L BORE/ TRANSFER SERVICES TO •o.10•r US o a.lnw, • N00,OIl aNl _ - STEEL CASING irrtBL STA 57.35 PROP 20'LATER LINE 7 qqq s1c Too. K r•tw Tr tl[m 1•20-BV 17.BD' LT • AT&T UTILITY L;INCS�SIOVH COMM'KT•1,1u ON., mBL STA 57.10 BEGIN PPCA °•'^°'1°`°1u•'me-ux maN n •N..T mPnNn wow uc 16.50' L7 BNw Bm4 va mill MY a<.c.e •�° coo,OIAN�Don _ ,..,,ILL STA 50•]5 CEN`500PUI•1IcEN.aflwiawS rACILI LIES I:wN�ii i o 0Al \s - Loma �26.50• LT _B„9 ! To. //''// 1°01 Cal r0ENSLINTILI END PPCA Date CLIKAST CABLE CoNRANr it.ADDENDW 2 5/24 JH LN • • e 46 TOP OF PAVEMENT A BASELINE WEST ROW L .. _ NG A PROP NL 4G 2 'a FL EAST DITCH _ -- - Rth' - • QQ N• B[scw.rmN oa[ MIN o., 1. Q2 0 BL STA 57.10N RI.STA 57.15 BEGIN DIP - - - • ..........._,.../..--, -Liar �;S z_ �E%IST B•VA. __�' •B��.\7�__ -r,`.- 012E L./Y,rts.+ 40 GRATE INLET 1^ ••\\\ �� P •• •I� IB'RCP-- TOP1N 45,33• OR TE INL •• •• •• „-•", &a 5/6/2013 TOP 43031'''' .-'•• • • • TC 45.33 7 ♦39' 40 • EN 3�((61"((((WWNO0AS)41.I4 (PROP 16'RATER LINE I6' Y EH``NE 1 1{ATE INLETGRATE LE 0 44.46 • 18•(N)41.$ �CWAX.IWG CR CHARLES 0. ANCCRS NC VO"OR('ItLCESSED, - _--' (� ,•T SE3.700 O .43.42 t0-(SW)41 BB 0000ASr trfi a[ssmnu S �� 18 77 R TE INLET II ( 38 ... ..... .. ..._. .. .. I I.... 1.A ... , 1 T(NW) A7 113"(NW)411 16 TOP♦ C (l l 00-5001 77051 SURE A w ... �" ... ...c E INLET IB'(SE)7966 38 ♦0 3 i -- \ .4344.---_-___J 418-(W e I6" iM LEADI ...� .2a:{SE�39 O1 t - l 24"Nl qT� 36 PROP•20^LATER•kINEI .•. 'TOPN MGM i4.fi7 I04 LF 36'STEEL CASING"' .. S EELS A9F CC? MIN540XLE RESTRAINED JOINTS/ 36• � '. BL STA 56.40 TO STA 57.30 4 TC♦4.65 • /RESTRAINED JOINTS/ MITI CLR 1 L �� I,; M 0 L RE TRAINED JOINT 1'� I ' 'U'4.s.BV ' " ' VITON'IFNW'TYPE GASREYS " ' �. 34 1 a Nw T[ �.�♦®♦h♦ 34 Pe . r S•�7��� . .. ...... . . Cityof d,Texas .. • •'10r 4!/�j�'•�%,"14:4P•/4P•44;•'��%!474re;�14•%4 44 j••%i•%0149/ir&I.4 s4+®�!�- !'s.:,'...t OLD ALVIN ROAD fr-2o 4s• BENDS .'•/•/•/�/•/•/•�••/•/•/•/•/•/•/•/•/�/�/� ••/•/•. .i.� 6'cx L AD • 20-INCH WATER UNE 32 -... ...... ...: .. ....... .... .... .... .......... . .. ......... .. .... �•• ♦I••••.•••••.4•••I. ••♦A ♦ 32 100' DEFLECTION PLAN A.PROFILE ALONG BASELINE _ STA 56+00 TO STA 60.00 30 • - . ... ..... ......;. .... .....-_......... ... ... . 30 ...... :BIB SUET ;..:z : 56 7+00 58+00 1�a ..n,..P.E 8 A, 21 59+00 60�00 ow,wL.n.,Hw,.He or 02 ripajoksill L _ T E. X A S +� Meeting Notes Pre-Bid Meeting-Old Alvin Road Water Line—John Lizer Road to McHard Road Meeting Date: May 16,2013 Meeting Time:9:00AM Attendees: Sign-In Sheet is attached to these Meeting Notes Meeting was opened at 9:05 AM by Mrs.Cara Davis Mrs. Davis led the meeting through Introduction of Participants, Introduction of Project,and the Bidding Process. Emphasis was put on the successful bidder submitting contract documents back to the City very quickly. The City is interested in having this project constructed during the summer when school is out. Charles D. Gooden,Jr. led the meeting through the Project Overview, Preliminary Cost Estimate, Contract,and Closing Comments. As part of the Project Overview, Mr. Gooden listed and discussed (1117, three special circumstances related to construction of this project: 1. Along Old Alvin Road from Plum to Town Ditch are the Pearland ISD Bus Barn,Pearland Public Works, Pearland EMS, and Pearland Fire Department. There will be extensive coordination with these organizations to minimize disruption during construction. 2. The wrought iron fence at Salem Village Apartments is to be removed and replaced. The temporary chain link fence is to be erected for the safety and security of the residents. Plans do not call for the removal of the motorized gate apparatus. 3. Potentially Petroleum Contaminated Area(PPCA)—exists near the intersection of Old Alvin Road and FM 518. Spec section 02105 details handling of contaminated soils and ground water. Mr. Gooden also noted that all items related to the PPCA are included in Items 27 and 31 of the bid proposal as issued with the Project Manual. Charles D. Gooden Consulting Engineers, Inc.TBPE#4176 Page 1 of 2 Phone(713) 660-6905 j Fax(713) 660-8817 2320 Holmes Road,Suite A, Houston,TX 77051 (7- VABbfkiktil r c x n s Questions as Posed by the Meeting Attendees Q1.Who will provide construction surveying and staking? Al.The contractor shall be responsible for construction surveying and staking. Q2. Is there an area actually found to be contaminated? Question was raised because of the title of the spec,"Potentially Petroleum Contaminated Area" A2.Yes,there is an area found to be contaminated. See the Phase II Environmental Site Assessment for contaminants,contaminant levels,and other details. Phase II Environmental Site Assessment was issued with the project manual via the City's E-Bid Website. Q3. Who will handle construction management/inspection? Climb\ A3. UA Engineering represented by Curtis Villarreal, P.E. Q4.Who will be responsible for the construction materials testing? A4. The City will retain and pay for construction materials testing. Q5. When do you anticipate issuing a notice-to-proceed? A5. Throughout this process the City is requesting contractors to submit all bonds, qualifications,and contract documents on an expedited basis. No date was given for a notice-to-proceed; however,it was made clear that this project is to be submitted to Council on June 10,2013. Meeting Adjourned at 9:45 AM. Meeting notes were compiled and produced by Charles D. Gooden,Jr., (713)660-6905. Distribution date: May 21,2013 (111\ Charles D. Gooden Consulting Engineers, Inc.TBPE#4176 Page 2 of 2 Phone(713) 660-6905 I Fax(713) 660-8817 2320 Holmes Road,Suite A, Houston,TX 77051 Old Alvin Road Water Line -John Lizer Rd to McHard Rd F ,� Sign-In Sheet Ttzi` May 16, 2013 www.cityofpearland.com/projects Name(Print) Company Phone Number FAX Number Email A/7 gg6-24o- �y� 6;' G�1�n���q��� �. 6 -ter ��`�7 l �1 Gc1/c�''[c� l 7 r��• � I- v� l / GQ,,, AeXC.O,'cd, c v�2 Lhci3 -CC(S-D fi93 713- s-Lf 23 `canQ €pbr ,Q7 J S-M.. CQ,•ri �, C7 }-tll S C__ �`A CJML 1 l�O� Ili 555 �`��� ♦C.CM"). { Admin 1 of 2 4.Revised 7/25/08 i Name(Print) Company Phone Number FAX Number Email 1 eA1414, Ca.r - 246,1_0f 267p •' '�7-Yr t_4 r-10 lc.c.Arre t't- -+''`i c 13noka l,A)t'1 .713 Soc ¶-f'-( ] 4.3/ krr Ie (.4-4 6t6,#lftclZ i1R 7 & tCM" C yr -P-5 '7 B`1`6p 13'33 c se aoo(l9t Q +G.�!5- CD 11r' L'{ '11 'I i l� V'r ;-U 1^1 l3'02igg 4,-;l i/ .glen?!/e•(C5'.ca 1 *To be included in consultant's meeting minutes *Consultant can add incorporate their information to bring to meetings Admin 2 of 2 4.Revised 7/25/08 rib\ i 1L x w e Meeting Notes Pre-Bid Meeting-Old Alvin Road Water Line—John Lizer Road to McHard Road Meeting Date: May 23, 2013 Meeting Time:2:00PM Attendees: Sign-In Sheet is attached to these Meeting Notes Meeting was opened by Mrs.Cara Davis Mrs. Davis led the meeting through Introduction of Participants, Introduction of Project, and the Bidding Process. Mrs. Davis then led the meeting through the rest of the agenda. Questions as Posed by the Meeting Attendees Q1. How will Project be awarded? Al. Lowest Responsible Bidder. Q2. Deadline for questions is today? A2.The deadline for questions will be extended to Tuesday, May 28,2013 at noon. Q3.Will paper bids be accepted? A3. Bidders are encouraged to utilize the City's E-Bid system. All bid proposal forms must be received by the 2PM closing deadline. Q4.Will City require pollution insurance? A4. Refer to the Project Manual for environmental guidance. Q5. Question was asked about the PPCA area and handling procedures for contaminated water and soil. A5. Refer to the Project Manual for environmental guidance. Q6. Is there more than one PPCA area? A6.There is only one PPCA area called out on the construction drawings. On sheet 21 of 92,an • erroneous call-out for Viton gaskets outside of the PPCA was removed. Q7. Do fittings require mechanical restraints as well as thrustblocks? A7. 20-inch line designed without thrustblocks. For all other lines, please observe City's standard detail. C17: Charles D.Gooden Consulting Engineers, Inc.TBPE#4176 Page 1 of 2 Phone(713) 660-6905 I Fax(713) 660-8817 2320 Holmes Road,Suite A, Houston,TX 77051 igow Q8. Who will pay for power pole bracing and relocations? A8.CenterPoint Energy has agreed to brace and/or relocate poles. Q9.Who pays to relocate buried fiber-optic cables? A9. Fiber optic cable in the right-of-way is the responsibility of the owner. Q10.General Note 1,sheet 3,states that select fill is to be used under pavement, but Detail 4/1 of sheet 47B states that cement stabilized sand is to be used. A10. Utility Note 1,Sheet 3 refers to select fill. Utility Note 1,Sheet 3 is hereby removed from the construction drawings. Q11. Did Engineer use Detail 4/1 on sheet 47B to calculate quantity for pavement removal? All. Detail 4/1 on sheet 47B was used to calculate quantity for pavement removal. Meeting minutes developed by Leon Hoch, P.E. and Charles Gooden,Jr. Distribution date: May 28,2013. • Attachment:Sign In Sheet Charles D. Gooden Consulting Engineers, Inc.TBPE#4176 Page 2 of 2 Phone(713) 660-6905 I Fax(713) 660-8817 2320 Holmes Road,Suite A, Houston,TX 77051 7-) 7-) 7-1 L Q Egli' Tr-.�44 Old Alvin Road Water Line -John Lizer Rd to McHard Rd " , Sign-In Sheet ` VIE May 23, 2013 N7.10? www.cityofpearland.com/projects Name(Print) Company Phone Number FAX Number Email -=( ( C (1)-76,-,-,4... op_5\c_ -71' -MF73- OO -7(s -473 -?ci 6 erisc cP ,7)P rcon`Lc-i :(1 n e-. 11�h z t-- r; 5 A) Co15 liz t7>-3 9 7.3 I c 7/.3'-)•-7 g j1( tsic A) a t-14-ri. )7 o ce .- Admin 1 of 2 4.Revised 7/25/08 7-1) •/-) •/) • Name(Print) Company Phone Number FAX Number Email 77..47�/ ;i .A e) '1/-:1-- cam 42- y 1 rD.�trn -I Try(4, StYuic2S •3a -sa4,4 a$1- y -t3oq 4 '��c4n�(}n)0121oSZYuit 5.4s✓' r \Lel ste. vim` �txr.3 8 32-3�°1-qe, s. eve l�-z g+e ch.gs+crl�►ct , J *To be included in consultant's meeting minutes 'Consultant can add incorporate their information to bring to meetings Admin 2 o 2 4.Revised 7/25/OS CITY OF PEARLAND SUMMARY OF WORK 05/2008 01100- 1 of 3 Section 01100 SUMMARY OF WORK 1.0 GENERAL 1.01 SECTION INCLUDES A A summary of the Work to be performed under this Contract,work by Owner,Owner furnished products, Work sequence, future Work, Contractor's use of Premises, and Owner occupancy. 1.02 WORK COVERED BY CONTRACT DOCUMENTS A Work of the Contract is for the construction of :Old Alvin Road Water Line from John Lizer Road to McHard Road. Approximately 13,000 linear feet of new 20-inch diameter water line and associated service transfers, water line abandonment, pavement removal and replacement,and storm sewer removal and replacement. The storm sewer to be up-graded is approximately 1,400 linear feet;pipe sizes are 24",36", and 48", box size is 5' x 4'. Control of surface and ground water; preparation and implementation of a traffic control plan and storm water pollution prevention plan,and all associated construction related permits are included in the scope. (b.\ B Special circumstances exist along Old Alvin Road from Plum Street to Town Ditch. This area houses the Pearland Independent School District Bus Barn,Pearland Public Works Department,Pearland EMS,and Pearland Fire Department. The City may see fit to limit working times in this area in order to accommodate the heavy traffic produced by these operations. During the day,fire trucks will be lined up behind the fire station and will exit through the gate on Orange Street. At night,any open trench shall be covered with plates in order to allow the fire trucks to be parked in the bays. While work is being performed at the EMS Station,the ambulance will be parked at Fire Station 1. Any open trench between Linwood Street and Town Ditch shall be covered with plates when work is not actively being performed. C Open-cut construction method shall be used for the water line and storm sewer unless otherwise shown on the drawings or instructed by the City Engineer. Any pavement curbs,sidewalks,driveways,fences,gates,irrigation systems,or mailboxes that have been distrubed shall be replaced with the same quality material or better. D All existing utility service lines may not be shown on the drawings. Contractor will anticipate that such service lines exist,and repair them at no additoinal cost to the City if damaged during construction. E A service connection tap shall be provided for each existing water meter; whether or not shown on the drawings. Wye type branches are not acceptable. The information on existing service connections represent the best informaiton available to the City and Engineer and is not warrented to be complete. CITY OF PEARLAND SUMMARY OF WORK 05/2008 01100- 1 of 3 CITY OF PEARLAND SUMMARY OF WORK 05/2008 01100-2 of 3 F The Contractor shall be responsible for field locating and avoiding sprinkler systems during construction. The contractor at no additional cost to the City or Owner shall repair any damage done to the sprinkler system by the Contractor with equal or better materials and workmanship. G Services are to be transferred between existing and proposed water lines with minimum interruption to end user. H Salvaged fire hydrants shall be returned to the City of Pearland Public Works Department, 3501 East Orange Street, Pearland, TX 77581. Telephone (281) 652- 1900. 1.03 WORK BY OWNER A None 1.04 OWNER FURNISHED PRODUCTS A None 1.05 WORK SEQUENCE A At present,no phases exist for the project. Owner may direct Contractor to begin work between FM 518(Broadway)and Town Ditch to take advantage of low traffic periods during the summer. The goal of such direction would be to perform intrusive work in the vicinity of schools in this area when school is out for the summer. B Contractor to submit project schedule to Engineer&Owner for approval as specified in Section 01300—Submittals. C Contractor shall coordinate the Work with the Engineer and Owner as specified in Section 01040 - Coordination and Meetings. 1.06 FUTURE WORK A None 1.07 CONTRACTOR'S USE OF PREMISES A Comply with procedures for access to the site and Contractor's use of rights-of-way as specified in Section 01140 -Contractor's Use of Premises. B Contractor shall be responsible for all utilities required for construction. 1.08 OWNER OCCUPANCY A Cooperate with the Owner to minimize conflict, and to facilitate the Owner's �` operations. Coordinate Contractor's activities with Engineer. \ CITY OF PEARLAND SUMMARY OF WORK 05/2008 01100-2 of 3 CITY OF PEARLAND SUMMARY OF WORK 05/2008 01100-3 of3 (11.1*.\ B Schedule Work to accommodate this requirement. 2.0 PRODUCTS -NotUsed 3.0 EXECUTION-NotUsed END OF SECTION CITY OF PEARLAND SUMMARY OF WORK 05/2008 01100-3 of 3 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS Section 01500 TEMPORARY FACILITIES AND CONTROLS 1.0 GENERAL 1.01 SECTION INCLUDES A Temporary facilities and the necessary controls for the Work including utilities, telephone, sanitary facilities, field office, storage sheds and building, safety requirements,first aid equipment,fire protection,security measures,protection of the Work and property, access roads and parking, environmental controls, disposal of trash,debris,and excavated material,pest and rodent control,water runoff and erosion control. B References to Technical Specifications: Section 00200—Instructions to Bidders Section 01100—Summary of Work Section 01350—Submittals Section 01566—Source Controls for Erosion& Sedimentation Section 01100—Summary of Work (411"', Section 01600—Material&Equipment Section 01570—Trench Safety System Section 01555—Traffic Control&Regulation Section 01720—Field Surveying Section 01563 —Tree&Plant Protection Section 01564—Control of Ground Water& Surface Water Section 13730-Computer Equipment C Referenced Standards: Occupational Safety and Health Administration(OSHA) National Fire Protection Association(NFPA) Code of Ordinances, City of Pearland,Texas D Definitions: Underground Structures - sewer, water, gas, and other piping, and manholes, chambers, electrical and signal conduits, tunnels, and other existing subsurface installations located within or adjacent to the limits of the Work. Surface Structures- existing buildings, structures and other constructed installations above the ground surface. Included with such structures are their foundations or any extension below the surface. Surface structures include, but are not limited to 12/2011 01500- 1 of 10 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS buildings,tanks, walls,bridges,roads, dams,channels,open drainage,piping,poles, wires,posts, signs, markers, curbs, walks, guard cables, fencing, and other facilities that are visible above the ground surface. 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1.04 CONTRACTOR'S RESPONSIBILITY A The facilities and controls specified in this Section are considered minimum for the Work. The Contractor may provide additional facilities and controls for the proper execution of the Work and to meet Contractor's responsibilities for protection of persons and property. B Comply with applicable requirements specified in other Technical Specifications. Maintain and operate temporary facilities and systems to assure continuous service. Modify and extend systems as Work progress requires. Completely remove temporary materials and equipment when their use is no longer required. Restore existing facilities used for temporary services to specified or to original condition. 1.05 TEMPORARY UTILITIES A Temporary Service Make arrangements with utility service companies for such temporary services as are necessary to construct the work and manage the site. Abide by rules and regulations of the utility service companies or authorities having jurisdiction. Be responsible for utility service costs until the Work is Substantially Complete. Included are fuel,power,light,heat,and other utility services necessary for execution, completion,testing, and initial operation of the Work. B Water Provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices, or for other use as required for proper completion of the Work. 12/2011 01500-2of10 CITY OFPEARLAND TEMPORARY FACILITIES AND CONTROLS For water to be drawn from public water supply, obtain special permit or license and meter from the proper City officials. For facilities under construction, establish a water/sewer billing account with City's Utility Billing Department.A deposit based on rates established by latest ordinance will be required. For water drawn from fire hydrants,apply for and receive a construction water meter from City'Public Works Department. Identify specific location for construction water meter installation. Once installed,water meter may not be moved without notification of Public Works Department. Install backflow preventer on fire hydrant supply if not included in City provided meter. Provide and maintain an adequate supply of potable water for domestic consumption by Contractor personnel. C Electricity and Lighting 1 Provide temporary electric power service in Contractor's name, as required for the prosecution of the Work, including testing of Work. Provide power for lighting, operation of the Contractor's equipment, or for any other use by Contractor or as necessary to maintain any of Owner's on-going operations as may continue on the site during any scheduled shutdown. Minimum lighting level shall be 5 foot-candles for open areas; 10 foot-candles for stairs and shops. 2 Provide permanent electric power service,in the Contractor's name,to the work or site as and when required by the schedule of the work to achieve Substantial Completion or Partial Substantial Completion.Contractor to establish service billing in its name and transfer service and billing to the Owner upon acceptance of the work as Substantially Complete and suitable for beneficial occupancy by the Owner. D Natural Gas Provide and pay for natural gas service to the work as and when required by the schedule to achieve Substantial Completion. Contractor to establish service billing in its name and transfer service and billing to the Owner upon acceptance of the work as Substantially Complete and suitable for beneficial occupancy by the Owner. E Temporary Heat and Ventilation Provide temporary heat as necessary for protection or completion of the Work. Provide temporary heat and ventilation to assure safe working conditions; maintain enclosed areas at a minimum of 50 degrees F. F Telephone Provide emergency telephone service at the Project Site for use by Contractor personnel and others performing work or furnishing services. G Sanitary Facilities Provide and maintain sanitary facilities for persons on the Project Site,in compliance with federal, state, and local regulations. Locate toilets on the Project Site near the 12/2011 01500-3of10 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS ,°1116' work and secluded from view insofar as possible. Keep toilets clean and supplied throughout the course of the Work. Enforce the use of sanitary facilities by construction personnel at the Project Site. Such facilities shall be enclosed. Pit-type toilets will not be permitted. No discharge will be allowed from these facilities. Collect and store sewage and waste so as not to cause a nuisance or health problem; have sewage and waste hauled off-site and properly disposed in accordance with local regulations. Control areas where sanitary facilities are located in conformance with Section 01566 — Source Controls for Erosion& Sedimentation. 1.06 FIELD OFFICE A Provision of a Field Office and other specific associated amenities as required in paragraph B below UNLESS otherwise stated in Section 00800 - Special Conditions of the Agreement,or Section 01100—Summary of Work. Provide for transportation,move-in,set-up,tie-down and,when project is complete,removal and move-out. The Contractor shall confirm location of office and other temporary facilities with Owner's Representative at Pre-Construction Meeting prior to delivery and set up. Location of temporary facilities shall be approved by the Owner's Representative by way of the submittal process. B. At a minimum, the Contractor's field office shall provide for, contain or serve to: provide a secured space for project administrative operations, periodic progress meetings,on-site storage for project files and plans,office space for CONTRACTOR's field supervisory personnel and provide a separate securable office space for OWNER's Representative including: meeting table and chairs, a single two drawer filing cabinet,a built-in drawing table and plan holders. Provide electric lighting and HVAC to the mobile office. 1. Field Office shall provide for, at a minimum,a high speed internet connection for use by Owner's Representative or Construction Manager as controlled by Paragraph A above. 1.07 STORAGE OF MATERIALS A Provide for storage of materials under the provisions of Section 01600—Material& Equipment. 1.08 SAFETY REQUIREMENTS A Contractor shall prepare, submit and follow a Safety Program that complies with federal, state, and local safety codes, statutes, and practices. Include in the Safety Program documented response to excavation, embankment, and trench safety requirements as specified in Section 01570—Trench Safety System. B Conduct operations in strict accord with applicable federal,state and local safety codes and statutes and with good construction practice. The Contractor is fully responsible and obligated to establish and maintain procedures for safety of all work,personnel and equipment involved in the Work. 12/2011 01500-4 of 10 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS C Observe and comply with Texas Occupational Safety Act (Art. 5182a, V.C.S.) and with all safety and health standards promulgated by Secretary of Labor under Section 107 of Contract Work Hours and Standards Act,published in OSHA Standards -29 CFR, Part 1926, and adopted by Secretary of Labor under the Williams-Steiger Occupational Safety and Health Act of 1970,and to any other legislation enacted for safety and health of Contractor employees. Such safety and health standards apply to subcontractors and their employees as well as to the Contractor and its employees. D Observance of and compliance with the regulations shall be solely and without qualification the responsibility of the Contractor without reliance or superintendence of or direction by the Engineer or the Engineer's representative. Immediately advise the Engineer of investigation or inspection by Federal Safety and Health inspectors of the Contractor or subcontractor's work or place of work on the Project Site under this Contract,and after such investigation or inspection,advise the Engineer of the results. Submit one copy of accident reports to Engineer within ten(10) days of occurrence. E Protect areas occupied by workmen using the best available devices for detection of lethal and combustible gases. Test such devices frequently to assure their functional capability. Constantly observe infiltration of liquids into the Work area for visual or odor evidence of contamination. Take immediate and appropriate steps to seal off entry of contaminated liquids to the Work area. F Safety measures, including but not limited to safety personnel, first-aid equipment, ventilating equipment and safety equipment,in the Plans and Technical Specifications are obligations of the Contractor. G Maintain required coordination with the local Police and Fire Departments during the entire period covered by the Contract. 1.09 FIRST AID EQUIPMENT A Provide a first aid kit throughout the construction period. List telephone numbers for physicians,hospitals, and ambulance services in each first aid kit. B Have at least one person thoroughly trained in first aid procedures present on the Project Site whenever work is in progress. 1.10 FIRE PROTECTION A Fire Protection Standards. Conform to specified fire protection and prevention requirements as well as those that may be established by Federal, State, or local governmental agencies. B. Comply with all applicable provisions of NFPA Standard No. 241, Safeguarding Building Construction and Demolition Operations. Provide portable fire extinguishers, rated not less than 2A or 5B in accordance with NFPA Standard No. 10,Portable Fire Extinguishers,for each temporary building,and (111b. for every 3000 square feet of floor area of facilities under construction. 12/2011 01500-5 of 10 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS Locate portable fire extinguishers within 50 feet maximum from any point on the Project Site. C. Fire Prevention and Safety Measures. Prohibit smoking in hazardous areas. Post suitable warning signs in areas that are continuously or intermittently hazardous. Use metal safety containers for storage and handling of flammable and combustible liquids. Do not store flammable or combustible liquids in or near stairways or exits. Maintain clear exits from all points within a structure. 1.11 SECURITY MEASURES A Protect all materials, equipment, and property associated with the Work from loss, theft,damage,and vandalism. Contractor's duty to protect property includes Owner's property. B If existing fencing or barriers are breached or removed for purposes of construction, provide and maintain temporary security fencing equal to existing as approved by Owner's Representative. 1.12 PROTECTION OF PUBLIC UTILITIES A Prevent damage to existing public utilities during construction. These utilities are shown on the Plans at their approximate locations. Give owners of these utilities at least 48 hours notice before commencing Work in the area, for locating the utilities during construction,and for making adjustments or relocation of the utilities when they conflict with the proposed Work. 1.13 PROTECTION OF PEOPLE AND PROPERTY A Preventive Actions. Take precautions,provide programs, and take actions necessary to protect the Work and public and private property from damage. Take action to prevent damage, injury or loss, including, but not limited to, the following: a. Store apparatus,materials,supplies,and equipment in an orderly,safe manner that will not unduly interfere with progress of the Work or the Work of any other contractor, any utility service company, or the Owner's operations. b. Provide suitable storage for materials that are subject to damage by exposure to weather,theft,breakage, or otherwise. c. Place upon the Work or any part thereof only such loads as are consistent with the safety of that portion of the Work. d. Frequently clean up refuse,rubbish,scrap materials,and debris caused , by construction operations,keeping the Work safe and orderly. 12/2011 01500-6 of 10 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS e. Provide safe barricades and guard rails around openings, for scaffolding, for temporary stairs and ramps, around excavations, elevated walkways,and other hazardous areas. Obtain written consent from proper parties before entering or occupying with workers, tools,materials or equipment,privately owned land except on easements provided for construction. Assume full responsibility for the preservation of public and private property on or adjacent to the site. If any direct or indirect damage is done by or on account of any act, omission, neglect, or misconduct in execution of the Work by the Contractor, it shall be restored by the Contractor to a condition equal to or better than that existing before the damage was done. B Barricades and Warning Signals. Where Work is performed on or adjacent to any roadway, right-of-way, or public place, furnish and erect barricades, fences, lights,warning signs,and danger signals; provide watchmen;and take other precautionary measures for the protection of persons or property and protection of the Work.Conform to Section 01555—Traffic Control& Regulation. C Preserving Control Points Maintain permanent benchmarks,public or private elevation or property demarcation and control monumentation, or other reference points. Unless otherwise directed in writing,replace at no cost to the Owner,those monuments,property corners or other permanent demarcations that are damaged or destroyed in accordance with Section 01720—Field Surveying. D Tree and Plant Protection. Protect trees,shrubs,lawns,outside of grading limits and within the grading limits as designated on the Plans,and in accordance with requirements of Section 01563—Tree &Plant Protection. E Protection of Underground and Surface Structures Known underground structures, including water, sewer, electric, and telephone services are shown on the Plans in accordance with the best information available,but is not guaranteed to be correct or complete. Contractor is responsible for making Locate Calls. Explore ahead of trenching and excavation work and uncover obstructing underground structures sufficiently to determine their location, to prevent damage to them and to prevent interruption of utility services. Restore to original condition damages to underground structure at no additional cost to the Owner. Immediately notify the agency or company owning any existing utility which is damaged,broken,or disturbed. Obtain approval from the Engineer and agency for any repairs or relocations, either temporary or permanent. 12/2011 01500-7 of 10 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS Necessary changes in location of the Work may be made by the Engineer to avoid (/111"\ unanticipated underground structures. If permanent relocation of an underground structure or other subsurface installations is required and not otherwise provided for in the Contract Documents,the Engineer will direct Contractor in writing to perform the Work, which shall be paid for under the provisions for changes in the Contract Price as described in Section 00700—General Conditions of Agreement. Support in place and protect from direct or indirect injury to underground and surface structures located within or adjacent to the limits of the Work. Install such supports carefully and as required by the party owning or controlling such structure. Before installing structure supports,Contractor shall satisfy the Engineer that the methods and procedures to be used have been approved by the owner of the structure. Avoid moving or in any way changing the property of public utilities or private service corporations without prior written consent of a responsible official of that service or public utility. Representatives of these utilities reserve the right to enter within the limits of this project for the purpose of maintaining their properties,or of making such changes or repairs to their property that may be considered necessary by performance of this Contract. Notify the owners and/or operators of utilities and pipelines of the nature of construction operations to be performed and the date or dates on which those operations will be performed. When construction operations are required in the rubh immediate vicinity of existing structures,pipelines,or utilities,give a minimum of five (5)working days advance notice. Probe and flag the location of underground utilities prior to commencement of excavation. Keep flags in place until construction operations reach and uncover the utility. Assume risks attending the presence or proximity of underground and surface structures within or adjacent to the limits to the Work including but not limited to damage and expense for direct or indirect injury caused by the Work to any structure. Immediately repair damage caused, to the satisfaction of the owner of the damaged structure. 1.14 PROTECTION OF THE WORK Provide protection of installed products to prevent damage from subsequent operations. Remove protection facilities when no longer needed,prior to completion of the Work. Control traffic to prevent damage to equipment, materials, and surfaces. 1.15 ROADS AND PARKING A Prevent interference with traffic and Owner operations on existing roads. B Minimize use of existing streets and driveways by construction traffic. C Control traffic to prevent damage to equipment,materials, and surfaces. CaRb.\ 12/2011 01500-8of10 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS D Construct and maintain temporary detours, ramps, and roads to provide for normal public traffic flow when use of public roads or streets is closed by necessities of the Work. E Provide mats or other means to prevent overloading or damage to existing roadways from tracked equipment or exceptionally large or heavy trucks or equipment F Designate temporary parking areas to accommodate construction personnel. When site space is not adequate, provide additional off-site parking. Locate as approved by Engineer. G Do not allow heavy vehicles or construction equipment unnecessarily in existing parking areas. 1.16 ENVIRONMENTAL CONTROLS A Provide and maintain methods, equipment, and temporary construction as necessary for controls over environmental conditions at the construction site and adjacent areas. B Comply with statutes,regulations,and ordinances which relate to the proposed Work for the prevention of environmental pollution and preservation of natural resources, including but not limited to the National Environmental Policy Act of 1969, PL 91- 190,Executive Order 11514. C Provide, install and maintain storm water runoff control including but not limited to temporary entrance, silt fencing, etc. as specified in Contract Documents. D Recognize and adhere to the environmental requirements of the Project. Disturbed areas shall be strictly limited to boundaries established by the Contract Documents. Burning of rubbish,debris or waste materials is not permitted. 1.17 POLLUTION CONTROL A Provide methods,means,and facilities required to prevent contamination of soil,water or atmosphere by discharge of noxious substances from construction operations. B Provide equipment and personnel to perform emergency measures required to contain any spillage,and to remove contaminated soils or liquids. Excavate and dispose of any contaminated earth off-site, and replace with suitable compacted fill and topsoil. C Take special measures to prevent harmful substances from entering receiving streams or storm water conveyance systems in conformance with TPDES requirements and Section 01566—Source Controls for Erosion& Sedimentation. D Provide systems for control of atmospheric pollutants. Prevent toxic concentrations of chemicals. Prevent harmful dispersal of pollutants into the atmosphere. 12/2011 01500-9 of 10 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS (111. E Use equipment during construction that conforms to current federal, state, and local laws and regulations. 1.18 PEST AND RODENT CONTROL A Provide rodent and pest control as necessary to prevent infestation of Project Site. B Employ methods and use materials which will not adversely affect conditions at the Project Site or adjoining properties. 1.19 NOISE CONTROL A Provide vehicles, equipment, and construction activities that minimize noise to the greatest degree practicable. Noise levels shall conform to OSHA Standards- 29 CFR and in no case will noise levels be permitted which create a nuisance in the surrounding neighborhoods. B Conduct construction operations during daylight hours from 7:30 a.m. to 6:00 p.m. except as approved by Engineer. C Comply with Chapter 19 NOISE,Codes of Ordinances, City of Pearland,Texas. 1.20 DUST CONTROL A Control objectionable dust caused by operation of vehicles and equipment under the provisions of Section 01566—Source Controls for Erosion& Sedimentation. 1.21 WATER RUNOFF AND EROSION CONTROL A Provide methods to control surface water,runoff,subsurface water,and water pumped from excavations and structures to prevent damage to the Work, the Project Site, or adjoining properties in accordance with Section 01564—Control of Ground Water& Surface Water and Section 01566—Source Controls for Erosion& Sedimentation. B Inspect earthwork periodically to detect any evidence of the start of erosion. Apply corrective measures as required to control erosion. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 12/2011 01500- 10 of 10 CITY OF PEARLAND MOBILIZATION CIPik\ Section 01505 MOBILIZATION 1.0 GENERAL 1.01 SECTION INCLUDES A Mobilization of construction equipment and facilities onto the Work. B Referenced Standards: 1. Texas Department of Transportation(TxDOT) 2. Texas Manual on Uniform Traffic Control Devices (Texas MUTCD) 1.02 MEASUREMENT AND PAYMENT A. Payment for Mobilization is on a Lump Sum basis and shall not exceed three percent(3%) of the total bid price. B. Payment for 50% of the Mobilization lump sum bid item may be included in the first monthly Application for Payment. Payment is subject to the receipt and approval by Engineer of the following items, as applicable: 1. Schedule of Values (Section 01350—Submittals) (11.6\ 2. Trench Safety Program(Section 01570—Trench Safety System) 3. Construction Schedule(Section 01350—Submittals) 4. Pre-construction Photographs (Section 01380—Construction Photographs) 5. Installation and acceptance of Project Identification Sign(s) (Section 01580—Project Identification Signs) 6. Installation and acceptance of Field Office(Section 01500—Temporary Facilities and Controls) 7. Installation and acceptance of TPDES requirements (Section 01565 - TPDES Requirements) C. Payment for 25% of the Mobilization lump sum bid item may be included in the second monthly Application for Payment. Payment is subject to the receipt and approval by Engineer of the following items, as applicable: 1. Installation of High Speed Internet Access (Section 01500—Temporary Facilities and Controls) 2. Laptop Computer(Section 00800—Special Conditions of Agreement) D. Payment for 15%of the Mobilization lump sum bid item may be included in the third monthly Application for Payment. E. Payment for the remaining 10%of the Mobilization lump sum bid item may be included in the fourth monthly Application for Payment. 09/2012 01505- 1 of 1 CITY OF PEARLAND MOBILIZATION G. Mobilization payments will be subject to Retainage as stipulated in Section 00700 General Conditions of Agreement. 2.0 PRODUCTS 2.01 PROJECT IDENTIFICATION SIGNS A. Provide specified number of project identification sign(s)per Section 01580. The name, address and contact information of the general contractor for the project shall be shown on the sign per Section 01580 and the attached exhibit. 3.0 EXECUTION 3.01 PLACEMENT OF PROJECT IDENTIFICATION SIGNS A. Place a Project Identification Sign as described in Section 01580,part 1.03, D visible to passing traffic or as directed by Engineer. END OF SECTION 09/2012 01505 - 1 of 1 CITY OF PEARLAND TPDES REQUIREMENTS (1111b.\ Section 01565 TPDES REQUIREMENTS 1.0 GENERAL A DEFINITIONS As used herein and in conjunction with TPDES General Permit No.TXR150000,the term OPERATOR refers to the CONTRACTOR. 1.01 SECTION INCLUDES A Description of the required documentation to be prepared signed and submitted by the Contractor before conducting construction operations, in accordance with the terms and conditions of the Texas Pollutant Discharge Elimination System(TPDES)General Permit TXR150000 as issued March 5, 2003 and re-issued March 5, 2008, by the Texas Commission on Environmental Quality under the provisions of Section 402 of the Clean Water Act and Section 26.040 of the Texas Water Code. B Contractor's responsibility for implementation,maintenance,and inspection of storm water pollution prevention control measures including,but not limited to,erosion and sediment controls,storm water management plans,waste collection and disposal,off- site vehicle tracking,and other practices shown on the Plans or specified elsewhere in this or other Technical Specifications. C References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01310—Coordination&Meetings 3. Section 01770—Contract Closeout D Referenced Standards: 1. Texas Commission on Environmental Quality(TCEQ) E Other References: 1. Storm Water Pollution Prevention Plan(SWPPP) found in Appendix A of these Technical Specifications. 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 2.0 PRODUCTS - Not Used 01/2008 01565- 1 of 3 CITY OF PEARLAND TPDES REQUIREMENTS 3.0 EXECUTION 3.01 REQUIRED NOTICES A The Contractor shall complete,sign,and date the Contractor's Notice of Intent(NOD attached in Appendix A. The Contractor's NOI shall be submitted to the TCEQ. It is the Contractor's responsibility to pay for any fees associated with the permit. Submission of the NOI is required by the Contractor before construction operations begin. B Upon completion of construction and acceptance of the Work by the Owner, the Contractor shall complete, sign, date and submit the Contractor's Notice of Termination(NOT) attached in Appendix A. 3.02 CERTIFICATION REQUIREMENTS A On the Operator's Information form attached in Appendix A, the Contractor shall complete name, address, and telephone number for the Contractor; the names of persons or firms responsible for maintenance and inspection of erosion and sediment control and Subcontractors. B The Contractormeasures and Subcontractors named in the Contractor's Information form shall read, sign, and date the Contractor's/Subcontractor's Certification form, attached in Appendix A. \! C The persons or firms responsible for maintenance and inspection of erosion and sediment control measures shall read, sign, and date the Contractor's Inspection and Maintenance Certification form,attached in Appendix A. D The Contractor's Information form and all certification forms shall be submitted to the Owner before beginning construction. E Contractor shall review implementation of the SWPPP in a meeting with the Owner and Engineer prior to start of construction in accordance with Section 01310 — Coordination&Meetings. 3.03 RETENTION OF RECORDS A The Contractor shall keep a copy of the SWPPP at the Project Site or at the Contractor's office from the date that it became effective to the date the Work is accepted by the Owner. B At Contract Closeout,the Contractor shall submit to the Owner all TPDES forms and certifications, as well as a copy of the SWPPP, in accordance with Section 01770— Contract Closeout. The SWPPP records and data will be retained by Owner for a period of 3 years from the date the Work is accepted by the Owner. 01/2008 01565-2 of 3 CITY OF PEARLAND TPDES REQUIREMENTS 3.04 POSTING OF NOTICES A The following notices shall be posted from the date that this SWPPP goes into effect until the date the Work is accepted by the Owner: 1. Copies of the Notices of Intent submitted by the Contractor and a brief Description of Construction Activity being conducted at the Project Site,as given in Article 1 of the SWPPP, shall be posted at the Project Site or at Contractor's office in a prominent place for public viewing. 2. Notice to drivers of equipment and vehicles, instructing them to stop,check, and clean tires of debris and mud before driving onto traffic lanes. Post such notices at every stabilized construction exit area. 3. In an easily visible location on Project Site,post a notice of waste disposal procedures. 4. Notice of hazardous material handling and emergency procedures shall be posted with the NOI on Project Site. Keep copies of Material Safety Data Sheets at a location on Project Site that is known to all personnel. 5. Keep a copy of each signed certification at the Project Site or at Contractor's office. APPENDIX A(PAGE 1 —50)FOLLOWS THIS SECTION END OF SECTION 01/2008 01565-3 of 3 CITY OF PEARLAND SAMPLING AND ANALYSIS IN PPCA Section 02105 SAMPLING AND ANALYSIS IN PPCA PART1 GENERAL 1.01 SECTION INCLUDES A. Preparatory work related to site remediation and excavation in a Potentially Petroleum Contaminated Area(PPCA). B. Sampling and analysis of site material. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices 1. Preparatory work is paid on a lump sum basis. Item includes hiring environmental consultants,preparing Environmental Health and Safety Plan, preparing Environmental Work Plan, training personnel, and obtaining permits and additional insurance. 2. Underground Utility construction in PPCA CIilk\ a. Underground utility construction and appurtenances in areas identified within PPCA limits is on a linear foot basis, each basis, or lump sum basis, as shown in Document 00300 -Bid Proposal. b. Payment includes compensation for labor, equipment, and supervision for mobilization, environmental monitoring and field screening,handling, sampling, and testing of contaminated soil and ground water. Contaminated soil may be Category I or II. Contaminated groundwater will be that encountered during excavation for underground utilities and flowing at a rate not greater than 20 gallons per minute. Included in this pay item is incremental cost for upgraded piping, gaskets, and appurtenant materials. c. Limits of measurement under this section are noted on Drawings as "Begin PPCA Excavation"and"End PPCA Excavation,"and other areas determined by the Engineer during the course of the work. d. Payment will be made upon receipt of field test reports from approved analytical laboratory. 3. Refer to Section 01200 -Measurement and Payment for unit price procedures. B. Stipulated Price(Lump Sum). If the Contract is a Stipulated Price Contract,payment , ilh\ for work in this Section is included in the total Stipulated Price. 02105-1 October 2008 CITY OF PEARLAND SAMPLING AND ANALYSIS IN PPCA CW' 1.03 REFERENCE STANDARDS A. ASTM D 5092 -Practice for Design and Installation of Groundwater Monitoring Wells in Aquifers. B. Code of Federal Regulation(CFR),Title 40, Section 261.24-Protection of the Environment. C. CFR,Title 29, Section 1910.120 -Occupational Safety and Health Administration, Department of Labor D. CFR,Title 29, Section 1926. -Occupational Safety and Health Administration, Department of Labor E. CFR,Title 40, Section 261,Appendix II. -Protection of the Environment. F. Texas Administrative Code(TAC),Title 30,Chapter 335 -Industrial Solid Waste& Municipal Hazardous Waste. G. TAC,Title 30, Chapter 334 -Underground and Aboveground Storage Tanks H. TAC,Title 30, Chapter 106.533 -Exemptions from Permitting, Subchapter X. Waste Processes and Remediation. I. U.S. Environmental Protection Agency(EPA), (SW-846)Test Methods for Evaluating Solid Waste, Office of Solid Waste and Emergency Response, Washington,D.C. (P1388-239223,November 1986). J. Texas Commission on Environmental Quality(TCEQ) (formerly Texas Natural Resource Conservation Commission(TNRCC)) Interoffice Memo, dated 4/12/94,by Chris Chandler, RPR Section,PST Division,regarding"Revised Procedures for Classifying and Assigning Waste Codes for Underground and Aboveground Petroleum Storage Tank Wastes(text attached following this section). 1.04 DEFINITIONS A. Petroleum: Crude oil,natural gas,natural gas liquids, liquified natural gas, and synthetic gas usable for fuel, as well as distillates of crude oil including gasoline, kerosene, diesel oil,motor oil,waste oil,jet fuels, and fuel oil. B. Potentially Petroleum Contaminated Area(PPCA): An area within station-to-station locations identified on Drawings where petroleum contamination has been detected in the soil or groundwater. PPCA also includes areas where contamination is suspected or encountered during utility installation outside areas identified on Drawings,and such contamination has been verified by the Engineer. C. Category I Soil: Soil containing visual or physical evidence of contamination,as described in paragraph 3.01, and that is not Category II Soil. 02105-2 October 2008 CITY OF PEARLAND SAMPLING AND ANALYSIS IN PPCA (00W, D. Category II Soil: Soil that contains petroleum contamination in excess of levels identified in paragraph 3.04, and is consistent with a classification as Special Waste- PST as defined by TCEQ (formerly TNRCC) in their interoffice memo dated 4/12/94, or soil that contains visible free product or is impacted with non-petroleum compounds detected above Risk Reduction Standard Number 2 levels as defined in the Texas Administrative Code,Title 30, Chapter 335. E. Potentially Contaminated Groundwater: Water recovered in a groundwater control system located in PPCA or groundwater that contains visual or physical evidence of contamination,as described in paragraph 3.01, and such contamination has been verified by the Engineer. 1.05 SUBMITTALS A. Conform to requirements of Section 01350- Submittal Procedures. B. Submit an Environmental Work Plan within 30 days after issuance of Notice to Proceed. 1. Environmental Work Plan to be prepared by a Corrective Action Project Manager licensed in Texas, who has completed 40-hours of Health and Safety Training and the required annual refresher training, and in the employment of a registered Corrective Action Specialist firm. 2. Environmental Work Plan shall include the following items. Compile and arrange in format acceptable to TCEQ. a. Proposed sequence of construction through PPCA; b. Procedures for screening soil in PPCA, identifying Category I or II Soil; c. Procedures for handling material from PPCA; d. Proposed location of stockpile areas; e. Proposed reuse of Category I Soil as trench backfill below depths of 30 inches; f. Proposed methods for disposal or recycling of Category I or II Soil; g. Proposed carriers of Category I or II Soil or potentially contaminated groundwater with verification each is properly licensed; h. Proposed recycle/disposal sites for Category I or II Soil or potentially contaminated groundwater with verification that each is properly licensed; i. Copy of permit required for discharge of potentially contaminated groundwater in sanitary sewer system, if to be disposed in sanitary sewer; 02105-3 October 2008 CITY OF PEARLAND SAMPLING AND ANALYSIS IN PPCA j. Name and qualifications of Corrective Action Project Manager and professional environmental consultants for health, environmental, and safety issues regarding operations within PPCA; and, k. Proposed analytical laboratory with verification it is accredited by A2LA or other recognized association, or it is a participant in the EPAs Performance Evaluation Program. 3. Do not commence work in PPCA until Environmental Work Plan has been reviewed and accepted by the Engineer. C. Submit Environmental Health and Safety Plan within 30 days after issuance of Notice to Proceed. 1. The Health and Safety Plan shall be prepared by a Corrective Action Project Manager licensed in Texas,who has completed 40 hours of health and safety training, and required annual refresher training, or a Certified Industrial Hygienist. 2. Include methods and procedures for assuring work,which will be conducted under conditions expected in the field, is safe. D. As work proceeds, submit field screening,monitoring and analytical laboratory test results on a weekly basis for soil and on a daily basis for groundwater. Summarize test results in tables together with applicable regulatory criteria. E. Submit copies of correspondence,reports,permits and other documents provided to, or received from,regulatory agencies. 1.06 PERSONNEL REQUIREMENTS A. Provide trained personnel who have completed minimum health and safety programs specified by the Occupational Safety and Health Administration in 29 CFR 1910.120. Before beginning work at the site, each employee that will work in PPCA is required to have completed 40 hours health and safety training and the required annual refresher training. PART2 PRODUCTS 2.01 MATERIALS A. Do not use polyvinyl chloride or other plastic material,unless approved by Engineer. B. Water Line Pipe Material. 1. Furnish ductile-iron pipe or steel pipe material within station-to-station locations identified as PPCA on Drawings. 2. Provide restrained joints for ductile-iron pipe or welded joints for steel pipe. 02105-4 October 2008 CITY OF PEARLAND SAMPLING AND ANALYSIS IN PPCA (11166\ 3. Provide pipe material conforming to Section 02634-Ductile-Iron Pipe and Fittings or Section 02635 - Steel Pipe and Fittings. C. Use Viton(FKM) type gaskets,or other material as recommended by the pipe manufacturer, for water lines, sanitary and storm sewer pipe, and appurtenances requiring gaskets. PART3 EXECUTION 3.01 POTENTIALLY PETROLEUM CONTAMINATED AREAS A. Conduct operations in PPCA in accordance with the accepted Environmental Work Plan and the Environmental Health and Safety Plan and to minimize the spread of contamination. In other areas which are either detected or suspected to be potentially petroleum contaminated areas, immediately notify the Engineer and proceed with work in accordance with this Section,unless otherwise directed by Engineer. B. Immediately notify the Engineer and TCEQ's Region 12 Field Office whenever Category I or II Soil or potentially contaminated groundwater are encountered. 1. Provide location, depth, type(soil or groundwater), source(if known),and evidence of suspected contamination. 2. Determine if Category I Soil or potentially contaminated groundwater is present by visual or physical evidence of contamination. Visual or physical evidence includes: a. Petroleum or chemical odor b. Indication of levels of contamination by air monitoring devices employed as part of the Environmental Health and Safety Plan. c. Soil or groundwater discoloration. d. Material oozing/dripping into excavation. e. Liquid or oily sheen floating on groundwater f. Buried containers or refuse. g. Field screening"head-space"results in excess of a 25 ppm reading on a photoionization detector(PID)or flame ionization detector(FID). C. Install piping and gasket materials and appurtenances in conformance with appropriate section, except as modified in this Section. D. Construct trench dams within a utility trench at each boundary of PPCA and laterals to minimize potential for contaminant transport within pipe bedding material. A ® trench dam shall consist of at least 24 inches of cement stabilized sand with 10 ` 02105-5 October 2008 CITY OF PEARLAND SAMPLING AND ANALYSIS IN PPCA percent bentonite clay added, extending from 6 inches below bottom of trench to within 12 inches of limits of topsoil or pavement. 3.02 ENVIRONMENTAL MONITORING A. An environmental consultant shall monitor conditions in PPCA,as specified in the Environmental Health and Safety Plan. Maintain safe working conditions in accordance with OSHA requirements (29 CFR 1926). 3.03 SCREENING PPCA SOILS A. An environmental consultant shall perform field screening of soil removed from excavation or tunneling in PPCA. B. Screening Procedures. 1. Place samples in a sealed plastic bag and place in a warm location for 15 minutes prior to screening. 2. Properly calibrate the PID/FID using a calibration gas. For PID use 100 ppm isobutylene and for FID use 100 ppm methane. 3. Open bag just enough to insert instrument probe and take maximum headspace (� reading. 4. Screen at least twice per hour while removing soils in open cut areas or shafts. 5. During tunneling, screen once for each pipe length in pipe jacked tunnels or each advance of tunnel shield in primary-lined tunnels. Screen at least once per shift where excavating. 3.04 SAMPLING AND TESTING A. Frequency. 1. Sample soil in PPCA at a rate of not less than one composite sample for every 20 cubic yards of excavation or volume corresponding to every 50 linear feet of installed underground utility,whichever is more frequent. 2. Sample water from PPCA to be discharged to a sanitary sewer one week prior to initiation of discharge, and at a rate of one grab sample once per day during discharge to sanitary sewer. B. Analyze soil samples for parameters listed in Table 02105, Soil Criteria-Petroleum Only,and in accordance with SW-846. Handle as a Category II Soil if analytical results indicate any one, or more,parameters exceed allowable Maximum Concentration listed in Table 02105-1. If benzene concentration from composite sample is greater than 5 milligrams per kilogram(mg/kg) or lead concentration is ( ik\ • greater than 30 mg/kg,perform Toxicity Characteristic Leaching Procedure(TCLP) 02105-6 October 2008 CITY OF PEARLAND SAMPLING AND ANALYSIS IN PPCA (.16\ analysis of appropriate compound for that sample to determine if a more stringent disposal classification is warranted. If contaminants other than petroleum are suspected, immediately notify the Engineer who will determine the list of parameters to be analyzed. Use a 4-part representative composite sample for analysis parameters, except when inconsistent with SW-846. C. Analyze groundwater samples for discharge to sanitary sewers. Analyze samples for BTEX by EPA Method 602, 8020,or 8021; TPH by Method TX 1005; and LEL in accordance with EPA Method 1010. D. Conduct analyses by proposed analytical testing laboratory listed in Environmental Work Plan. 3.05 EXCAVATION MONITORING REQUIREMENTS A. Ensure health and safety of workers at the construction site. Maintain air quality within the construction zone to conform to exposure limits specified in Code of Federal Regulations(CFR) Title 29, Section 1910.120 enforceable by OSHA. B. Provide adequate shoring and sufficient escape ladders in accordance with applicable trench safety regulatory requirements. C. In the trench, continuously operate a combustible gas indicator(CGI) with LEL/02 meter to monitor vapor and oxygen levels. Properly calibrate CGI and provide an alarm that sounds if greater than or equal to 20 percent Lower Explosive Limit(LEL), less than or equal to 19.5 percent oxygen, or greater than or equal to 25 percent oxygen is reached. Record monitoring data from CGI every 15 minutes to ensure safe working conditions. D. Take appropriate measures during construction to keep LEL levels below 20 percent in the trench. If vapor concentrations exceed 20 percent of LEL, stop construction work,turn off equipment,and have workers immediately vacate the PPCA in an upwind direction. E. Take reading with PID/FID 50 feet downwind of an area during excavation or work in contaminated excavation areas and until one hour after cessation of such work. Take readings within breathing zone at approximately 4 feed above ground level. Record readings, date, time, initials of person taking reading,PID/FID serial number and last calibration date of PID/FID in bound field book. (111114\ 02105-7 October 2008 CITY OF PEARLAND SAMPLING AND ANALYSIS IN PPCA TABLE 02105-1 SOIL CRITERIA-PETROLEUM ONLY Maximuma Contaminant Concentration(mg/kg) Method TPH 1500 TX 1005 Total BTEXb 150 EPA 8020/8021 Total Lead 250 EPA 6000/6010/7000 Notes: a If any parameters exceed the maximum concentrations,then the soil shall be considered Category II Soil and a Special Waste-PST as defined by the TCEQ in their interoffice memo dated 4/12/94. b If benzene is greater than 5.0 mg/kg then analyze TCLP benzene which should be<0.3 mg/1. If total lead is great than 30 mg/kg then analyze TCLP lead which should be<1.5 mg/1. Definitions: TCLP-toxicity characteristic leachate procedure(40 CFR 261,Appendix II) BTEX-benzene,toluene,ethyl benzene,and total xylenes TPH-total petroleum hydrocarbons mg/kg-milligrams per kilogram mg/1-milligrams per liter TABLE 02105-2 POTENTIALLY CONTAMINATED GROUNDWATER DISCHARGE LIMITS Discharge to Sanitary Sewer Parameter,. Limit Method „ TPH(mg/1) 30.0 TX 1005 Total BTEX(mg/1) 1.0 EPA 602/8020/8021 Lower Explosive Limit(%) 10 EPA 1010 Notes: See definitions above. END OF SECTION Culh\ 02105-8 October 2008 CITY OF PEARLAND SPECIAL PROVISION TO SECTION 02220 Section 02220S Special Provision to Section 02220-Site Demolition All references to Technical Specification"Section 01730—Cutting and Patching"are removed. End of Section C ' 06/2012 02220S-1 of 1 CITY OF PEARLAND SPECIAL PROVISION TO SECTION 02510 Section 02510S Special Provision to Section 02510-Water Mains Section 2.02 "POLYVINYL CHLORIDE (PVC)PRESSURE PIPE"is altered as follows: Under Item A. "Pipe"add the following text: "PVC pressure pipe of 16-inches through 20-inches for water shall conform to AWWA C-905." Section 3.03 "WET CONNECTIONS"is altered as follows: Under Item D: "2-Inch Wet Connections" the word copper is replaced with the word polyethylene. End of Section f 06/2012 02510S-1 of 1 CITY OF PEARLAND WATER TAP AND SERVICE LINE INSTALLATION Section 02515 WATER TAP AND SERVICE LINE INSTALLATION 1.0 GENERAL 1.01 SECTION INCLUDES A Tapping existing mains and furnishing and installing new service lines for water. B References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 02318—Excavation and Backfill for Utilities 3. Section 02520—Valve Boxes,Meter Boxes, and Meter Vaults C Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM D 2737 Standard Specification for Polyethylene (PE) Plastic Tubing(Pressure Rated). 2. American Water Works Association(AWWA) a. AWWA C800 Standard Underground Service Line Valves and Fittings b. AWWA C900 Polyvinyl Chloride (PVC)Pressure Pipe, 4"— 12" for Water Distribution \111111.\ D Definitions: 1. Short Side Connection- service line connecting proposed curb stop, located inside water meter box,to water main on same side of street. 2. Long Side Connection- service line connecting proposed curb stop, located inside water meter box,to water main on opposite side of street or from center of streets where supply main is located in street center such as boulevards and streets with esplanades. 1.02 MEASUREMENT AND PAYMENT A Measurement for installation of 1 inch water taps and service lines is on a per each basis. Separate measurements will be made for "Short Side" and "Long Side" connections. B Measurement for installation of 2 inch water taps and service lines is on a per each basis. Separate measurements will be made for "Short Side" and "Long Side" connections. C Payment for installation of water taps and service lines includes locating water main, tap installation and connection to meter,restoring site,excavation,bedding,backfill, compaction,push-unders, etc.,and all other labor and materials required to complete • installation as indicated on Plans. D Refer to Section 01200—Measurement and Payment Procedures. 04/2009 02515- 1 of 6 CITY OF PEARLAND WATER TAP AND SERVICE LINE INSTALLATION 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit manufacturer's product data for approval. 2.0 PRODUCTS 2.01 MATERIALS A Copper Tubing: 1. Provide Type K annealed, seamless, copper tubing, 1-inch to 2-inch in diameter conforming to requirements of ASTM B 88. 2. Furnish 1 inch tubing in straight stock of a minimum 20 feet in length. Furnish 2 inch tubing in coils 40 feet in length. 3. All tubing shall be manufactured in United States of America. Copper tubing may be inspected and tested by a laboratory designated by the Owner at point of manufacture or locally. Furnish tubing,without cost,to designated testing laboratory with mil compliance certificates. 4. Provide pack joint type brass fittings for use with Type K annealed copper tubing in accordance with AWWA C800. B Polyethylene Tubing- SDR 9 CTS. C Corporation Stops: AWWA C800 as modified herein: 1. Inlet End: AWWA standard thread. 2. Valve Body: Tapered plug type,0-ring seat ball type,or rubber seat ball type. 3. Outlet End: Pack joint type fitting for use with type-K, soft copper. 04/2009 02515-2 of6 CITY OF PEARLAND WATER TAP AND SERVICE LINE INSTALLATION C111.6..\ D Provide taps for various water main types and sizes in accordance with following schedule: PIPE TAPPING SCHEDULE WATER MAIN SERVICE SIZE TYPE AND DIAMETER 1" 2" 4" Cast Iron or Ductile DSS,WBSS DSS,WBSS Iron 4" Asbestos Cement WBSS DSS,WBSS 4" PVC (AWWA DSS,WBSS DSS,WBSS C900) 6" and 8" Cast Iron or DSS,WBSS DSS,WBSS Ductile Iron 6" and 8" Asbestos DSS,WBSS DSS,WBSS Cement 6" and 8" Cast Iron or DSS,WBSS DSS,WBSS Ductile Iron 6" and 8" PVC DSS,WBSS DSS,WBSS (AWWA C900) 12" Cast Iron or Ductile DSS,WBSS DSS, WBSS � Iron 12"Asbestos Cement DSS,WBSS DSS, WBSS 12"PVC (AWWA DSS,WBSS DSS, WBSS C900) 16" and Up Cast Iron or DWBSS DWBSS Ductile Iron 16" and Up Asbestos DWBSS DWBSS Cement 16" and Up PVC DWBSS DWBSS (AWWA C900) DSS—Dual Strap Saddles WBSS—Wide Band Strap Saddles DWBSS—Dual Wide Band Strap Saddles *Mueller H-15092, or equal E Dual Strap Saddles: Red brass body and straps; ductile-iron;vinyl-coated body and straps; or ductile-iron, nylon-coated strap (Romac 101N or equivalent) body and stainless-steel straps. F Taps for PVC Water Mains: Use dual-strap or single,wide-band strap saddles which provide full support around circumference of pipe and bearing area of sufficient width along axis of pipe, 2 inches minimum, ensuring that pipe will not be distorted when 04/2009 02515-3 of 6 CITY OF PEARLAND WATER TAP AND SERVICE LINE INSTALLATION saddle is tightened. Romac Series l O 1N wide-band,stainless-steel tapping saddle with AWWA standard thread(Mueller thread)or equal. G Taps for Steel Pipe: Not allowed, unless specifically approved by Engineer. Use saddle only if tap is approved on steel pipe. H Curb Stops and Brass Fittings: AWWA C800 as modified herein. 1. Inlet End: Pack joint type fitting. 2. Valve Body: Straight-through or angled,meter-stop design equipped with the following: a. 0-Ring seal straight plug type. b. Rubber seat ball type. 3. Outlet End: Female, iron-pipe thread or swivel-nut, meter-spud thread on 1 inch stops and 2-hole flange on 2 inch sizes. 4. Fittings:Ford or approved equal;use same size open end wrenches and tapping machines as used with respective Ford fittings. 5. Factory Testing of Brass Fittings: a. Submerge in water for 10 seconds at 85 psi with stop in both closed and open positions. b. Reject any fitting that shows air leakage. Owner may confirm tests locally. Entire lot from which samples were taken will be rejected when random sampling discloses unsatisfactory fittings. I Angle Stops: In accordance with AWWA C800; ground-key, stop type with bronze lock-wing head stop cap; inlet and outlet threads conform to application tables of AWWA C800; and inlets pack joint connection. 1. Outlet for 1-inch size: Meter swivel nut with saddle support. 2. Outlet for 2 inch size: 0-ring sealed meter flange,iron pipe threads. J Fittings: In accordance with AWWA C800 and: 1. Castings: Smooth, free from burrs, scales, blisters, sand holes, and defects which would make them unfit for intended use. 2. Nuts: Smooth cast and have symmetrical hexagonal wrench flats. 3. Thread fittings, of all types, shall have N.P.T. or AWWA threads, and male threaded ends shall be protected in shipment by plastic coating or other equally satisfactory means. 4. Pack joint tube fittings shall have beveled gasket. 5. Stamp of manufacturer's name or trademark and size on body. 3.0 EXECUTION 3.01 GENERAL A Set service taps at right angles to proposed meter location and locate taps in upper pipe segment within 45 degrees of pipe springline unless otherwise approved by Engineer. B For service lines and lateral connections larger than those allowed in this Section,Part (11.6\ 2.01C,branch connections must be used. 04/2009 02515-4 of 6 CITY OF PEARLAND WATER TAP AND SERVICE LINE INSTALLATION (111.."` C Tapped collars of appropriate sizes: Approved in new construction only provided they are set at right angles to proposed meter location. D All 2-inch and smaller service taps on pressurized water mains: Use tapping machine manufactured for pressure tapping purposes. E Install service lines in open-cut trench in accordance with Section 02318—Excavation and Backfill for Utilities except that service lines under all paved roadways, other paved areas and areas indicated on Plans shall be installed in bored hole as specified in this Section. F Unless otherwise approved by Engineer,lay service lines with minimum of 30 inches of cover as measured from top of curb or, in absence of curbs, from centerline elevation of crowned streets or roads. Provide minimum of 18 inches of cover below flow line of all ditches to service lines,unless otherwise approved by Engineer. G Service lines across existing street(push-unders): Pull service line through prepared hole under paving. Only full lengths of tubing will be used. Take care not to damage copper tubing when pulling it through hole. A pack joint type union is only permitted if Contractor cannot span underneath pavement with a full length of tubing. Contractor is allowed one pack joint type union for each full length of tubing,provided it is not under the pavement. H Maintain service lines free of dirt,coupons and foreign matter at all times. I Install service lines per City of Pearland. Standard Details. J Locate water meters in accordance with City of Pearland Standard Details. Contact Engineer when major landscaping or trees conflict with service line and meter box location. No additional payment will be made for work on customer side of meter. K Joints 1. Minimum joint spacing for 1 inch tubing shall be in multiples of 60 feet and for 2 inch tubing shall be in multiples of 40 feet. 2. Cut copper tubing squarely by using an approved cutting tool and avoiding excessive pressure on the cutting wheels which might bend or flatten pipe walls. 3. For pack joint fittings, cut copper tubing squarely prior to insertion into the fitting. Final assembly shall be in accordance with manufacturer's recommended procedure. L Bends 1. Bending of tubing shall be accomplished by using appropriate sized bending tool. No kinks, dents, flats, or crimps will be permitted, and should such occur,the damaged section shall be cut out and replaced. Bends shall have no smaller radius than radius of coil of tubing as packaged by manufacturer. Copper tubing shipped in straight lengths conform to following: a. For 2-inch diameter: Maximum of one 45 degree bend per 4 foot section. 04/2009 02515-5 of 6 CITY OFPEARLAND WATER TAP AND SERVICE LINE INSTALLATION 3.02 CURB STOP INSTALLATION A Set curb stops or angle stops at outer end of service line inside of meter box. Secure opening in curb stop to prevent unwanted material from entering. In close quarters, make an "S" curve in the field. No flattening of tube. In all 1-inch services, install meter coupling,swivel-nut,or curb stop ahead of meter. Install straight meter coupling on outlet end of meter. 3.03 SEQUENCE OF OPERATIONS A Open trench for proposed service line in accordance with Section 02318—Excavation and Backfill for Utilities. B Install curb stop on meter end of service line. C With curb stop open and prior to connecting service line to meter in slack position, open corporation stop and flush service line thoroughly. Close curb stop, leaving corporation stop in full-open position. D Check service line for apparent leaks. Repair any leaks before proceeding. E Call to schedule inspection prior to backfilling. After inspection, backfill in accordance with Section 02318—Excavation and Backfill for Utilities. C.16\ F Install meter box centered over meter with top of lid 3-inches above fmished grade for grasses or landscaped areas,and flush with finished grade for paved areas. Meter box: Refer to Section 02520—Valve Boxes,Meter Boxes, and Meter Vaults. END OF SECTION 0 04/2009 02515-6 of 6 CITY OF PEARLAND PVC PIPE Section 02534 PVC PIPE 1.0 GENERAL 1.01 SECTION INCLUDES A Polyvinyl chloride pressure pipe for water distribution in nominal diameters 4 inches through 16 inches. B Polyvinyl chloride sewer pipe for gravity sanitary sewers in nominal diameters 4 inches through 48 inches. C Polyvinyl chloride pressure pipe for gravity sanitary sewers and force mains in nominal diameters 4 inches through 36 inches. D References to Technical Specifications: 1. Section 01350—Submittals 2. Section 02634—Ductile Iron Pipe and Fittings 3. Section 02533—Sanitary Sewage Force Mains 4. Section 02512—Polyethylene Wrap 5. Section 02510—Water Mains 6. Section 02530—Gravity Sanitary Sewers 7. Section 02731 —Sanitary Sewage Force Mains 8. Section 02630—Storm Sewers 9. Section 02318—Excavation and Backfill for Utilities E Referenced Standards: 1. American Water Works Association(AWWA) a. AWWA C900 Polyvinyl Chloride (PVC)Pressure Pipe, 4"— 12"for Water Distribution b. AWWA C905 Polyvinyl Chloride (PVC) Water Transmission Pipe, Nominal Diameters, 14in. Through 36 in. c. AWWA C110 Ductile-Iron and Gray Iron Fittings for Water 2. American Society for Testing and Materials (ASTM) a. ASTM D 1784,"Standard Specification for Rigid Poly Vinyl Chloride (PVC) Compounds and Chlorinated Poly Vinyl Chloride (CPVC) Compounds" b. ASTM F 477,"Standard Specification for Elastomeric Seals(Gaskets) for Joining Plastic Pipe" c. ASTM D 3139,"Standard Specification for Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals" d. ASTM D 3034, "Standard Specification for Type PSM Poly Vinyl Chloride(PVC) Sewer Pipe and Fittings" e. ASTM F 949,"Standard Specification for Poly Vinyl Chloride(PVC) Corrugated Sewer Pipe with a Smooth Interior and Fittings" 02/2008 02534- 1 of 6 CITY OF PEARLAND PVC PIPE �`\ f. ASTM D 794,"Standard Specification for Poly Vinyl Chloride(PVC) ll Profile Gravity Sewer Pipe and Fittings Based on Controlled Inside Diameter" g. ASTM F 679,"Standard Specification for Poly Vinyl Chloride(PVC) Large-Diameter Plastic Gravity Sewer Pipe and Fittings" h. ASTM D 2241,"Standard Specification for Poly Vinyl Chloride(PVC) Pressure-Rated Pipe(SDR Series)" i. ASTM D 3212,"Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals" j. ASTM D 2444, "Standard Test Method for Determination for the Impact Resistance of Thermoplastic Pipe and Fittings by Means of a Tup (Falling Weight)" k. ASTM D 1248, "Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and Cable" 1. ASTM D 2321, "Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications" 3. American National Standards Institute(ANSI) a. ANSI A21.10 Cast Iron and Ductile Iron Fittings, 2 thru 48 in./Water b. ANSI A21.11 Rubber Gasket Joints Cast and Ductile Iron Press Pipe 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for PVC pipe under this Section. Include cost in Bid Items for Water Mains,Gravity Sanitary Sewer,and Sanitary Sewage Force Mains. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. . B Submit Shop Drawings showing design of new pipe and fittings indicating alignment and grade, laying dimensions, fabrication, fittings, flanges, and special details. 1.04 QUALITY CONTROL A Submit manufacturer's certifications that PVC pipe and fittings meet requirements of this Section and AWWA C900 or AWWA C905 for pressure pipe applications,or the appropriate ASTM standard specified for gravity sewer pipe. B Submit manufacturer's certification that PVC pressure pipe has been hydrostatically tested at the factory in accordance with AWWA C900 or AWWA C905 and this Section. C When foreign manufactured material is proposed for use, have material tested for conformance to applicable ASTM requirements by certified independent testing laboratory located in United States. Certification from any other source is not acceptable. Furnish copies of test reports to the Engineer for review. Cost of testing shall be borne by Contractor or Supplier. 02/2008 02534-2 of 6 CITY OF PEARLAND PVC PIPE Climh\ 2.0 PRODUCTS 2.01 MATERIAL A Use PVC compounds in the manufacture of pipe that contain no ingredient in an amount that has been demonstrated to migrate into water in quantities considered to be toxic. B Furnish PVC pressure pipe manufactured from Class 12454-A or Class 12454-B virgin PVC compounds as defined in ASTM D 1784. Use compounds qualifying for a rating of 4000 psi for water at 73.4 degrees F per requirements of PPI TR3. Provide pipe which is homogeneous throughout,free of voids,cracks,inclusions,and other defects, uniform as commercially practical in color, density, and other physical properties. Deliver pipe with surfaces free from nicks and scratches with joining surfaces of spigots and joints free from gouges and imperfections which could cause leakage. C For PVC pressure pipe used for water mains,provide self-extinguishing PVC pipe that bears Underwriters'Laboratories mark of approval and is acceptable without penalty to Texas State Fire Insurance Committee for use in fire protection lines. D Gaskets: 1. Gaskets shall meet the requirements of ASTM F 477. Use elastomeric factory- installed gaskets to make joints flexible and watertight. 2. Pipes to be installed in potentially contaminated areas, especially where free '' product is found near the elevation of the proposed sewer, shall have the following gasket materials for the noted contaminants. CONTAMINANT GASKET MATERIAL REQUIRED Petroleum(diesel, gasoline) Nitrile Rubber Other contaminants As recommended by the pipe manufacturer E Lubricant for rubber-gasketed joints: Water soluble,non-toxic,non-objectionable in taste and odor imparted to fluid, non-supporting of bacteria growth, having no deteriorating effect on PVC or rubber gaskets. 2.02 WATER SERVICE PIPE A Pipe 4-inch through 12-inch: AWWAC900, Class 150, DR 18; nominal 20-foot lengths; cast iron equivalent outside diameters. B Pipe 16-inch: AWWA C905; Class 235; DR 18; nominal 20 foot lengths; cast iron equivalent outside diameter. C Joints: ASTM D 3139; push-on type joints in integral bell or separate sleeve couplings. Do not use socket type or solvent weld type joints. (ob.\ 02/2008 02534-3 of 6 CITY OF PEARLAND PVC PIPE Where restrained joints for buried service are required by Plans,provide one of the following, or Approved Equal(restrained joints shall be polyethylene wrapped): 1. UNI-FIT Series 6130, 6190, or 6190-D by United Water Products. 2. Pipe Restraint by ROMAC Industries 3. EBAA IRON MEGALUG Bell Restraint Harness for AWWA C900 and C905 PVC Pipe. D Make curves and bends by deflecting the joints. Do not exceed maximum deflection recommended by the pipe manufacturer. Submit details of other methods of providing curves and bends for review by the Engineer. E Hydrostatic Test: AWWA C900,AWWA C905, ANSI A21.10 (AWWA C110); at point of manufacture; submit manufacturer's written certification. 2.03 BENDS AND FITTINGS FOR PVC PRESSURE PIPE A Bends and Fittings: ANSI A21.10, ductile iron; ANSI A21.11 single rubber gasket push-on type joint; minimum 150 psi pressure rating. B Coatings and Linings: Conform to requirements of Section 02634—Ductile Iron Pipe and Fittings. 2.04 GRAVITY SANITARY SEWER PIPE A PVC gravity sanitary sewer pipe shall be in accordance with the provisions in the following table: WALL PRODUCT ASTM SDR(MAX.)/ DIAMETER TYPE MANUFACTURER OPTIONS DESIGNATION STIFFNESS(MIN.) SIZE RANGE Solid J-M Pipe Approved D3034 SDR 26/PS 115 6"to 10" CertainTeed Approved D3034 SDR 35/PS 46 12"& 15" Can-Tex Approved F679 SDR 35/PS 46 18"to 27" Carlon Diamond Approved AWWA C900 DR 18/N/A 4"to 12" Approved AWWA C905 DR 18/N/A 14"to 36" Profile Contech A-2000* Only when F949 N/A/50 psi 12"to 36" included in the ETI Ultra-Rib Bid Schedule F794 N/A/46 psi 12"to 48" Lamson Vylon F794 N/A/46 psi 21"to 48" *Allowed to be used to a maximum depth of 10' only. B When solid wall PVC pipe 18 inches to 27 inches in diameter is required in SDR 26, provide pipe conforming to ASTM F679,except provide wall thickness as required for SDR 26 and pipe strength of 115 psi. 02/2008 02534-4 of 6 CITY OF PEARLAND PVC PIPE C For sewers up to 12-inch-diameter crossing over waterlines, or crossing under waterlines with less than 2 feet separation,provide minimum 150 psi pressure-rated pipe conforming to ASTM D 2241 with suitable PVC adapter couplings. D Joints: Spigot and integral wall section bell with solid cross section elastometric or rubber ring gasket conforming to requirements of ASTM D 3212 and ASTM F 477. E ASTM D 3139 and ASTM F 477 shall be provided. Gaskets shall be factory- assembled and securely bonded in place to prevent displacement. The manufacturer shall test a sample from each batch conforming to requirements ASTM D 2444. F Fittings: Provide PVC gravity sewer sanitary bends, tee, or wye fittings for new sanitary sewer construction. PVC pipe fittings shall be full-bodied, either injection molded or factory fabricated. Saddle-type tee or wye fittings are not acceptable. 2.05 SANITARY SEWER FORCE MAIN PIPE A Provide PVC pressure pipe conforming to the requirements for water service pipe,and conforming to the minimum working pressure rating specified in Section 02533 — Sanitary Sewage Force Mains. B Acceptable pipe joints are integral bell-and-spigot,containing a bonded-in elastomeric sealing ring meeting the requirements of ASTM F 477. In designated areas requiring restrained joint pipe and fittings, use EBAA Iron Series 2000PV, Uniflange Series (1111h. 1350 restrainer,or equal joint restraint device conforming to UNI-B-13,for PVC pipe 12-inch diameter and less. C Fittings: Provide ductile iron fittings as per this Section,2.03 `Bends and Fittings for PVC Pressure Pipe", except furnish all fittings with one of the following internal linings: 1. Nominal 40 mils (35 mils minimum) virgin polyethylene complying with ASTM D 1248,heat fused to the interior surface of the fitting,as manufactured by American Cast Iron Pipe"Polybond", or U.S. Pipe "Polyline". 2. Nominal 40 mils(35 mils minimum)polyurethane,Corro-pipe II by Madison Chemicals,Inc. 3. Nominal 40 mils(35 mils minimum)ceramic epoxy,Protecto 401 by Enduron Protective Coatings. D Exterior Protection: Provide polyethylene wrapping of ductile iron fittings as required by Section 02512—Polyethylene Wrap. E Hydrostatic Tests: Hydrostatically test pressure rated pipe in accordance with this Section,2.02E. F Manufacturers: Approved manufacturers of pressure rated, solid wall PVC pipe for sanitary sewer force mains are: 1. J&M Manufacturing Company, Inc. 2. CertainTeed Corporation (111.6'. 3. Diamond Plastics Corporation 02/2008 02534-5 of 6 CITY OF PEARLAND PVC PIPE 4. Carlon Company 5. North American Pipe Corporation(NAPCO) 3.0 EXECUTION 3.01 PROTECTION A Store pipe under cover out of direct sunlight and protect from excessive heat.or harmful chemicals in accordance with the manufacturer's recommendations. 3.02 INSTALLATION A Conform to requirements of Section 02510—Water Mains, Section 02530—Gravity Sanitary Sewers,Section 02731 —Sanitary Sewage Force Mains,and Section 02630— Storm Sewers. B Install PVC pipe in accordance with Section 02318 — Excavation and Backfill for Utilities,ASTM D 2321, and manufacturer's recommendations. C Water service pipe 12 inches in diameter and smaller: Installed to clear utility lines and have minimum 4 feet of cover below lowest property line grade of street,unless otherwise required by Plans. D For water service,exclude use of PVC within 200 feet(along the public right-of-way) (Pik\ of underground storage tanks or in undeveloped commercial acreage. Underground storage tanks are primarily located on service stations but can exist at other commercial establishments. E Avoid imposing strains that will overstress or buckle the pipe when lowering pipe into trench. F Hand shovel pipe bedding under the pipe haunches and along the sides of the pipe barrel and compact to eliminate voids and ensure side support. END OF SECTION Clia‘\ 02/2008 02534-6 of 6 CITY OF PEARLAND SPECIAL PROVISION TO SECTION 02634 (111 Section 02634S Special Provision to Section 02634—Ductile Iron Pipe and Fittings All references to Technical Specification "Section 02676—Hydrostatic Testing of Pipelines" are removed. Section 2.01 "DUCTILE IRON PIPE"is altered as follows: Item A is revised to read: "Ductile iron pipe barrels: ANSI A21.15, ANSI A21.50 or ANSI A21.51;bear mark of Underwriters'Laboratories approval" Add Item C to read: "Use minimum Pressure Class 250 for water lines or thickness Class 52 for water lines in casing or augered hole. Provide minimum thickness Class 52 for sanitary sewers. Provide minimum Pressure Class 350 for flanged pipe." Climb\ Section 2.02 "JOINTS"is altered as follows: Under Item B. add the following text: "4. EBAA IRON MEGALUG Mechanical Joint Restraint" Section 2.03 "GASKETS" is altered as follows: Replace the existing table in Item B with the following table: Contaminant Gasket Material Required Petroleum(diesel, gasoline) Nitrile Rubber,FKM Viton Type Gasket(ASTM 1418) Other contaminants As recommended by the pipe manufacturer End of Section CI11116\ 06/2012 02634S-1 of 1 CITY OF PEARLAND COMPUTER EQUIPMENT SECTION 13731 —COMPUTER EQUIPMENT PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Special Conditions and Division 01 Specification Sections, 01200 Measurement and Payment Procedures, 01350 Submittals, 01500 Temporary Facilities and Controls and 01505 Mobilization apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Portable"laptop"computer work-station. 2. One or more internet access workstations. 3. Computer operating system and application software. 1.3 DEFINITIONS A. CPU: Central processing unit. B. ProTrak software: a web-based project management and collaborative communications system providing multiple project users access to all project documentation. C. Credential: Password for the protected access to the ProTrak software providing data security for project documentation. D. DSL: Digital Subscriber Line. Commercial subscription for access to the internet E. Wireless Hub: Wireless access to the DSL internet connection for use with wireless computer modems in lap top computers. F. PC: Personal computer. Applies to the central station, workstations, file servers and portable lap tops. G. PDF: Portable Document Format. The file format used by the Acrobat document-exchange- system software from Adobe. H. RAS: Remote access services. I. RF: Radio frequency. J. ROM: Read-only memory. ROM data are maintained through losses of power. K. TCP/IP: Transport control protocol/Internet protocol incorporated into Microsoft Windows. 12,2011 13730- 1 CITY OF PEARLAND COMPUTER(11116'\ L. UPS: Uninterruptible power supply. M. USB: Universal serial bus. N. WAN: Wide area network. O. WAV: The digital audio format used in Microsoft Windows. P. WMP: Windows media player. Q. Windows: Operating system by Microsoft Corporation. R. Workstation: A PC with software that is configured for specific functions. 1.4 ACTION SUBMITTALS A. Product Data: Provide manufacturer's product description as a submittal for each type of product indicated. Include rated capacities, operating characteristics, and furnished specialties or accessories. Reference each product to the original specification. Warranty data and any required warranty use authorization should be provided and transferable to the City as end user. 1.5 CLOSEOUT SUBMITTALS A. Operation and Maintenance Data: Provide all users' manuals, warranty information and any proof of purchase type information required for warranty and information regarding imbedded CifDIN, . software licensing. In addition to items specified in Section 01782"Operation and Maintenance Data,"include the following: 1. Microsoft Windows software documentation. 2. PC installation and operating documentation, manuals, and software for the PC and all installed peripherals. Software shall include system restore, emergency boot diskettes/ cd's,and drivers for all installed hardware. Provide separately for each PC. 3. Hard copies of manufacturer's specification sheets, operating specifications, design guides,user's guides for software and hardware, and PDF files on CD-ROM of the hard- copy submittal. 4. System installation and setup guides with data forms to plan and record options and setup decisions. 1.6 QUALITY ASSURANCE A. Comply with NFPA 70,"National Electrical Code." B. Provide "new" in the box materials and equipment complete with manufacturer's warranty as required. Provide all documentation as supplied by OEM. 1.7 DELIVERY, STORAGE,AND HANDLING A. Workstations,and Portable"laptop"computers: 12,2011 13730-2 CITY OF PEARLAND COMPUTER EQUIPMENT 1. Store in temperature- and humidity-controlled environment in original manufacturer's sealed containers. Maintain ambient temperature between 50 and 85 deg F,and not more than 80 percent relative humidity,non-condensing. 2. Open each container; verify contents against packing list; and file copy of packing-list, complete with container identification. 3. Save original manufacturer's containers and packing materials and deliver as directed under provisions covering extra materials. 1.8 PROJECT CONDITIONS A. Environmental Conditions: System shall be capable of withstanding the following environmental conditions without mechanical or electrical damage or degradation of operating capability: 1. Indoor,Controlled Environment: System components,except installed in air-conditioned indoor environments shall be rated for continuous operation in ambient conditions of 36 to 78 deg F dry bulb and 20 to 90 percent relative humidity,non-condensing. 2. Outdoor Environment: System components installed in locations exposed to weather shall be rated for continuous operation in ambient conditions of 36 to plus 100 deg F dry bulb and 20 to 90 percent relative humidity,condensing. PART 2-PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by the following Manufacturer to comply with existing City IT requirements and Software access: 1. Dell Computer: Latitude E6420 ATG(225-0702) B. Basis-of-Design Product: Subject to compliance with requirements, provide Dell Latitude E6420 (225-0702)or comparable product. 2.2 DESCRIPTION A. System Hardware and Software: Base Unit: Dell Latitude E6420 ATG(225-0702) Processor: Intel Core i5-2540M,2.60GHz,3MB Cache,Dell Latitude E6X20(317-5995) Memory: 4.0GB,DDR3-1333MHz SDRAM,2 DIMM,Dell Latitude(317-6239) Keyboard: Internal Backlit Dual Pointing English Keyboard,Dell Latitude E(331-1201) Keyboard: Tech Setup Guide,English,Dell Latitude E6420 ATG(331-1715) Keyboard: Documentation(English/French),Dell Latitude E-Family/Mobile Precision(331-2169) Video Card: Intel HD Graphics 3000,Dell Latitude E6420 ATG(318-0512) Hard Drive: 320GB Hard Drive 7200RPM,Dell Latitude E(342-0482) (1111.6\ 12,2011 13730-3 CITY OF PEARLAND COMPUTER EQUIPMENT Hard Drive Controller: NO Internal Fingerprint Reader and NO contactless smartcard reader,Dell Latitude E6420 ATG(331-2714) Floppy Disk Drive: 14.0 in HD(1366x768)Anti-Glare LED,Dell Latitude E6420 ATG(320-2141) Floppy Disk Drive: LCD Cover,No Touchscreen,Dell Latitude E6420 ATG(318-0510) Operating System: Genuine Windows 7 Professional,64-bit,No Media,Latitude,English(421-8067) Modem: No Modem,Dell Latitude E(331-1221) TBU: 90W 3-Pin,AC Adapter,Dell Latitude E(331-1719) TBU: US-3 foot Flat Power Cord,Dell Latitude(330-4016) CD-ROM or DVD-ROM 8X DVD+/-RW Bezel,Dell Latitude E6320/E6420/E6520/ATG(318-0466) Drive: Software Cyberlink Power DVD 9.5,No Media,Dell OptiPlex,Latitude and Precision Work- station(421-4370) Software: Roxio Creator Starter,No Media,Dell OptiPlex,Latitude and Precision Workstation (421-4539) Sound Card: No Camera,with single digital microphone,Dell Latitude E6420/ATG(318-0441) Processor Cable: Intel WiFi Link 6205(802.11a/g/n 2X2) 1/2 MiniCard for VPRO Latitude E/Mobile Precision(430-3961) Documentation Disk- Intel vPro Technology Advanced Management Features,Dell Latitude E6X20(331- ette: 1227) Bundled Software: Adobe Acrobat X,includes Serial Key Card,FI,ENG/FRN(410-0560) Bundled Software: Microsoft Office Professional 2010,English,OptiPlex,Precision and Latitude(421- 3957) Feature 6-Cell(60WH)Primary Lithium Ion Battery for Latitude(312-1151) Feature Carrying Handle,Latitude E6420 ATG(331-1713) Service: Dell Limited Hardware Warranty Plus Service Extended Year(s)(934-9528) Service: Dell Limited Hardware Warranty Plus Service Initial Year(929-3587) Service: ProSupport:Next Business Day Limited Onsite Service After Remote Diagnosis 4 Year Extended(927-0034) Service: ProSupport:Next Business Day Limited Onsite Service After Remote Diagnosis Ini- tial Year(951-4140) Service: ProSupport: 7x24 Technical Support,4 Year Extended(928-8134) Service: ProSupport:7x24 Technical Support,Initial(956-5210) Support: Accidental Damage Service,5 Year(927-0184) Support: Info,Complete Care(988-7689) (111111‘\ 12,2011 13730-4 CITY OF PEARLAND COMPUTER EQUIPMENT t Misc: Energy Star Enabled/E-PEAT/Gold,Latitude E6420/ATG(331-1931) Misc: Intel Core i5 vPro Processor(331-1641) Resource DVD with Drivers,Dell Latitude E6420/ATG(331-1222) Cyberlink Power 9.5.1 AND Roxio Creator Starter Media for DVD+/-RW,Dell Opti- Plex,Workstation and Latitude(421-5109) Media Kit,Win 7 Professional 64bit,MUI,Dell OptiPlex,Precision and Latitude(421- 5682) Dell Back-up and Recovery Manager for Win7,MUI,Optiplex,Precision,Latitude (331-3300) CFI,Integration Fee,Order Ready,Pronc(365-0530) B. Field Office Internet Access 1. CONTRACTOR shall provide and pay for DSL internet access in the temporary Field Office for use by OWNER'S REPRESENTATIVE,CONSTRUCTION MANAGER and INSPECTORS as well as for CONTRACTOR'S use. a. Service must support a minimum of two users simultaneously and be available at all times during working ours b. No separate pay item will be made for Internet Access. Include monthly cost in Temporary Facilities,if a separate pay item is established,or as an incidental cost PART 3-EXECUTION Provide computer equipment and software submittal in initial "Critical" submittals as material submittal#1. Upon approval by OWNER and ENGINEER; a) deliver computer equipment to OWNER in original manufacturer's packaging. b) Establish wireless internet connections in CONTRACTOR'S field office and coordinate operation of computer with internet access at this location and request c) Invoice Computer Equipment line item in first 50%of Mobilization. END SECTION (111116\ 12,2011 13730-5