R-2013-066-2013-05-13RESOLUTION NO. R2013-66 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE QUIET ZONE CROSSING AND MEDIAN IMPROVEMENTS AT THE INTERSECTION OF BROADWAY (FM 518) AND THE BNSF RAILWAY. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with the Quiet Zone Crossing and Median Improvements at the intersection of Broadway (FM 518) and the BNSF Railway, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to General Contractor Services, Inc., in the amount of $141,240.00. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the Quiet Zone Crossing and Median Improvements at the intersection of Broadway (FM 518) and the BNSF Railway. PASSED, APPROVED and ADOPTED this the 13th day of May, A.D., 2013. c ATTEST: 0 MA IA E. RODRIGUEZ DE UTY CITY SECRETARY APPROVED AS TO FORM: i DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR Exhibit A ARKKENGINEERS May 7, 2013 Mr. Cuong Le Project Manager City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Re: Letter of Recommendation for Quiet Zone Crossing and Median Improvements Project City of Pearland, Texas ARKK Job No. 12-015 Dear Mr. Le: On April 23, 2013, four (4) bids were received for the above referenced project. This project involves improvements to the median and BNSF railroad crossing on Broadway Street (FM 518). The following is a summary of our bid evaluation: 1. Bid Tabulation Sheet — Four (4) construction firms participated in the bidding process. The bids were checked for mathematical errors and/or bid irregularities. The bids for the project are as follows: Bidder Total Bid General Contractor Services, Inc. $141,240.00 AAA Asphalt Paving Inc $151,287.00 Jerdon Enterprise L.P. $157,157.57 151 Contracting, Inc. $241,270.00 A copy of the bid tabulation is attached to this letter. ARKK Engineers estimated the cost of the job at $151,199.37 placing the engineer's estimate in the middle of the bids. The low bid is very close to the Engineer's estimate especially considering the size and nature of this project. 7322 Southwest Fwy Suite 1040 • Houston, TX 77074 • (713)-400-ARKK • www.arkkengineers.com • TX PE Firm No. 13872 2. Qualifications and References — General Contractor Services, Inc. submitted a List of Qualifications with references for this project. (See Attached) 3. Financial Statement — General Contractor Services, Inc. provided a Financial Statement with the bid. ARKK's personnel have contacted the references provided to obtain information on General Contractor Services, Inc. performance on the completed projects. The references contacted indicated that General Contractor Services, Inc. have done a good job and they have been satisfied with the performance of General Contractor Services, Inc. on these projects. A summary of the information gathered from the references is included with this letter. ARKK Engineers also followed up with General Contractor Services, Inc. staff to discuss the project and City's expectations. General Contractor Services, Inc. staff indicated that they have the crews and experience to complete the work and are planning to complete the work successfully. Based on the information provided and input from the references contacted, General Contractor Services, Inc. appears to be a responsible firm that should be capable of performing the specified work in a satisfactory manner. Therefore, we recommend that the City of Pearland award the Quiet Zone Crossing and Median Improvements Project to General Contractor Services, Inc. for a total amount of $141,240.00. If you have any questions, please contact me. Sincerely, ARKK ENGINEERS, LLC James B. Andrews, P.E. Principal Cc: Mr. Skipper Jones — City of Pearland Mr. John D. Rudloff, P.E. — ARKK Engineers 7322 Southwest Fwy Suite 1040 • Houston, TX 77074 • (713)-400-ARKK • www.arkkengineers.com • TX PE Firm No. 13872 Resolution No. R2013-66 Exhibit "A" Project Manual #o r: Quiet Zone Crossing And Median Improvements Broadway (FM 518) at BNSF Railway COP Project -No.: TR l 002 Bid No.: 1213-15 March, 2013 Prepared 13y: ARK }{ENGINEERS ,�ltiluuxtut A.c4,"*.A�.9 0� `T�'�sr�! ��MM.liWM«N•M.•MM•�•••• Ij r JOHN D. RUDLOFF •e 83386 it. z• 1141°111...\-9.4/10P--4°#to0;4...r#'1:1 •t 4/t /13 7322 Southwest Fwy Sui'e 1040 • 1?ouston, TX 77074 • 1713,-t1R0-ARXK • www.ir'ikcnzincers.ccrn • TX PE Firm No. 13872 CONSENT OF SURETY COMPANY TO FINAL PAYMENT AIA DOCUMENT G707 BOND NO. 4391321 OWNER ARCHITECT CONTRACTOR SURETY OTHER PROJECT: (name, address) Quiet Zone Crossing and Median Improvements, Broadway (FM 518) at BNSF Railway City of Pearland, Texas COP PN: TR1002 Bid No.: 1213-15 TO (OWNER) City Of Pearland CONTRACTOR: General Contractor Services, Inc. ARCHITECT'S PROJECT NO: CONTRACT FOR: CONTRACT DATE: General Construction In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and address of Surety Company) SureTec Insurance Company 1330 Post Oak Boulevard Suite 1100 Houston, TX 77056 on bond of (here insert name and address of Contractor) General Contractor Services, Inc. 8400 LaPorte Road Houston, TX 77012 , SURETY COMPANY, ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) City Of Pearland 4635 Southwest Freeway Suite 1000 Houston, TX 77027 as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this Attest: By: Name: Title: S m ety $ itne . s January 14, 2014 SureTec Ind .. c o:. .any Sure By , OWNER, Signature of Authorized Representative Kevin McQuain, Attorney -In -Fact (Seal) Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706 CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition AIA DOCUMENT G707 * CONSENT OF SURETY COMPANY TO FINAL PAYMENT * APRIL 1970 EDITION * AIA ONE PAGE 1970 * THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 POA ft: 4221392 SureTec Insurance Company LIMITED POWER OF ATTORNEY Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents make, constitute and appoint Maxine Elaine Lewis, Rosalyn D. Hassell, Scott D. Chapman, Kevin McQuain, Justin McQuain, Jeanne M. Buchan, Keith M. Ilia its true and lawful Attorney-in-fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for: Five Million and 00/100 Dollars ($5,000,000.00) and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President, sealed with the corporate seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney -in -Fact may do in the premises. Said appointment shall continue in force until 12/31/2015 and is made under and by authority of the following resolutions of the Board of Directors of the SureTec Insurance Company: Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney -in -Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20th of April, 1999.) In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, and its corporate seal to be hereto affixed this 21st day of March, A.D. 2013. RAMOII% w SURETEC INSURANCE COMPANY w 1 w �" i n= John I' nox Jr. &esident State of Texas ss:^' � if -_ County of Harris ...... •••' " / 4'....„„to, .MMilinli��M4^M On this 21st day of March, A.D. 2013 before me personally came John Knox Jr., to me known, who, being by me duly sworn, did depose and say, that he resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the Board of Directors of said Company; and that he signed his name thereto by like order. JACQUELYN MALDONADO Notary Public State o1 Texas My Comm. Exp. 5/18/2017 Jacq"iielyn Maldonado, Notary Public My commission expires May 18, 2017 I, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set out in the Power of Attorney are in full force and effect. Given under my hand and the seal of said Company at Houston, Texas this day of lit L m Bre t Beaty, Assistant ecretary Any instrument issued in excess of the penalty stated above is totally void and without any validity. For verification of the authority of this power you may call (713) 812-0800 any business day between 8:00 am and 5:00 pm CST. ' A.D. CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ATTACHMENT NO. 2 TO GENERAL CONDITIONS AGREEMENT FOR FINAL PAYMENT AND CONTRACTOR'S SWORN RELEASE In consideration of the Final Payment under that certain contract between [Contractor's Company Name] (hereafter "CONTRACTOR") and the City of Pearland (hereafter "OWNER") for the Project known as Quiet Zone Crossing And Median Improvements (the "Contract"), the CONTRACTOR makes the following representations to OWNER, either individually if a proprietorship, or jointly and severally by all general partners if a partnership, or if a corporation, by action of the president and secretary of said corporation, as duly authorized by appropriate action of the stockholders and/or board of directors of said corporation, their signatures hereon constituting a representation under oath by said individuals that they have the authority to execute this Agreement for and on behalf of the said corporation: 1. The undersigned CONTRACTOR represents to OWNER that the Application for Payment for the Final Payment under the Contract, and the final Change Order issued under the Contract if any, whether or not modified, corrected or changed in some way by the ENGINEER, the CONTRACTOR or the OWNER, a copy of which are attached hereto and marked Exhibit "A", are true, correct and accurate, and that CONTRACTOR has received payment in full for all other Applications for Payment submitted under the Contract, and that CONTRACTOR has been fully compensated for all labor, materials, equipment and/or services furnished in connection with the Contract, except for the Final Payment. 2. It is agreed and stipulated by the undersigned CONTRACTOR that upon the receipt of Final Payment in the amount as set out on the attached Application for Payment, the CONTRACTOR, by execution of this instrument of release, does, therefore, RELEASE and FOREVER DISCHARGE OWNER of and from all manner of debts, claims, demands, obligations, suits, liabilities and causes of action of any nature whatsoever, at law or in equity, in contract or in tort, now existing or which may hereafter accrue, arising out of or related to the Contract, any Change Orders or Work Orders, the Work, or any labor, materials, equipment or services furnished by CONTRACTOR to OWNER. 3. The CONTRACTOR, acting by and through the person or persons whose names are subscribed hereto, does solemnly swear and affirm that all bills and claims have been paid to all materialmen, suppliers, laborers, subcontractors, or other entities performing services or supplying materials or equipment, and that OWNER shall not be subject to any bills, claims, demands, litigation or suits in connection therewith. 4. It is further specifically understood and agreed that this Agreement for Final Payment and Contractor's Sworn Release shall constitute a part of the Contract, and it is also specifically understood and agreed that this Agreement shall not act as a modification, waiver or renunciation by OWNER of any of its rights or remedies as set out in the Contract itself, but this Agreement for Final Payment and Contractor's Sworn Release shall constitute a supplement thereto for the additional protection of OWNER. 05/2007 00700 - B1 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT SIGNED and EXECUTED this, the 14 taay of January , 2014 . CONTRACTOR: By: Signature Print Name: Pamela Teltschick Title: President [If CONTRACTOR is a proprietorship, owner must sign; if a partnership, each general partner must sign; if a corporation, the following language should be used.] SIGNED and EXECUTED this, the 14th day of January 2014 by GENERAL CONTRACTOR SERVICES, INC. , a Texas corporation, under authority granted to the undersigned by said corporation as contained in the Charter, By -Laws or Minutes of a meeting of said corporation regularly called and held. CONT CTOR: - By: c� 7 Pamela eltschic President ATTEST: Corporate Secretary (Corporate Seal) [This form is for use by either a proprietorship or a partnership. In the event CONTRACTOR is a partnership or a joint proprietorship, additional signature lines should be added for each individual.] 05/2007 00700 - B2 Project Manual for: Quiet Zone Crossing And Median Improvements Broadway (FM 518) at BNSF Railway COP Project No. : TR1002 Bid No. : 1213- 15 March, 2013 Prepared By: ARINMENGINEERS 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 •(713)-400-ARKK•www.arkkengineers.com• TX PE Firm No.13872 CITY OF PEARLAND BRAZORIA COUNTY,TEXAS TABLE OF CONTENTS SECTION TITLE DIVISION 0 BIDDING AND CONTRACT DOCUMENTS 00100 Invitation to Bid 00200 Instructions to Bidders 00300 Bid Proposal—Part A 00300 Bid Proposal—Part B 00500 Standard Form of Agreement 00610 Performance Bond 00611 Payment Bond 00612 One-Year Maintenance Bond 00615 Partial Waiver of Lien 00700 General Conditions of Agreement 00701 Attachment No 1 to General Conditions 00702 Attachment No 2 to General Conditions 00703 Attachment No 3 to General Conditions 00800 Special Conditions of Agreement �.. 00800a Exhibit C—Contractor Requirements 00800b Exhibit C-1 —Agreement between BNSF Railway&Contractor 00811 Wage Scale for Engineering Construction DIVISION 1 GENERAL REQUIREMENTS 01100 Summary of Work 01140 Contractor's Use of Premises 01200 Measurement and Payment Procedures 01290 Change Order Procedures 01310 Coordination and Meetings 01350 Submittals 01380 Construction Photographs 01420 Referenced Standards 01430 Contractor's Quality Control 01440 Inspection Services 01450 Testing Laboratory Services 01500 Temporary Facilities and Controls 01505 Mobilization 01550 Stabilized Construction Exit 01560 Filter Fabric Fence 01561 Reinforced Filter Fabric Barrier 01562 Waste Material Disposal 01563 Tree and Plant Protection 01570 Trench Safety System 00010- 1 of 3 CITY OF PEARLAND TABLE OF CONTENTS 01580 Project Identification Signs 01600 Material and Equipment 01630 Product Options and Substitutions 01720 Field Surveying 01730 Cutting and Patching 01750 Starting Systems 01760 Project Record Documents 01770 Contract Closeout DIVISION 2 SITE WORK 02200 Site Preparation 02220 Site Demolition 02633 Adjusting Manholes, Inlets, and Valve Boxes 02811 Landscape Irrigation 02820 Wood Fences and Gates 02821 Chain Link Fences and Gates 02931 Landscape and Tree Planting 02980 Pavement Repair and Resurfacing TxDot Standard Specification for Construction and Maintenance of Highways, Streets, and Bridges 100 ITEMS Earth Work and Landscape 104 Removing Concrete 105 Removing Stabilized Base and Asphalt Pavement 110 Excavation 134 Backfilling Pavement Edges 160 Topsoil 161 Compost 162 Sodding for Erosion Control 164 Seeding for Erosion Control 168 Vegetative Watering 200 ITEMS Subgrade Treatments and Base 204 Sprinkling 210 Rolling 216 Proof Rolling 247 Flexible Base 292 Asphalt Treatment(Plant-Mixed) 300 ITEMS Surface Courses and Pavement 300. Asphalts, Oils, and Emulsions 301. Asphalt Anti-stripping Agents 302. Aggregates for Surface Treatments 305. Salvaging, Hauling, and Stockpiling Reclaimable Asphalt Pavement 00010-2of3 CITY OF PEARLAND TABLE OF CONTENTS 310. Prime Coat 314. Emulsified Asphalt Treatment 316. Surface Treatment 320. Equipment for Asphalt Concrete Pavement 340. Dense-Graded Hot-Mix Asphalt(Method) 341. Dense-Graded Hot-Mix Asphalt(QC/QA) 360. Concrete Pavement 400 ITEMS Structures 400. Excavation and Backfill for Structures 420. Concrete Structures 421. Hydraulic Cement Concrete 440. Reinforcing Steel 500 ITEMS Miscellaneous Construction 502 Barricades, Signs, and Traffic Handling 506 Temporary Erosion, Sedimentation, and Environmental Controls 512 Portable Concrete Traffic Barrier 520 Weighing and Measuring Equipment 529 Concrete Curb, Gutter, and Combined Curb and Gutter 530 Intersections, Driveways, and Turnouts 536 Concrete Medians and Directional Islands 585 Ride Quality for Pavement Surfaces 600 ITEMS Lighting, Signing,Markings,and Signals 662 Work Zone Pavement Markings 666 Reflectorized Pavement Markings 668 Prefabricated Pavement Markings 672 Raised Pavement Markers 677 Eliminating Existing Pavement Markings and Markers 678 Pavement Surface Preparation for Markings 700 ITEMS Maintenance 760 Cleaning and Reshaping Ditches END OF SECTION Nolo-3 of 3 CITY OF PEARLAND INVITATION TO BID (imb' Section 00100 INVITATION TO BID CITY OF PEARLAND,TEXAS Lowest Responsible Bidder Sealed Electronic Bids will be accepted for the following project, in the City's E-bid System. Electronic bids shall be submitted through the City's web site at: www.cityofpearland.org/bids. All interested Bidders are required to register as a "supplier" on the City's E-bid System at the above web address and clicking on "Supplier Registration". Registration provides automatic access to any changes to the Plans, Specifications or Bid time and date. However, submission of an E-bid requires completing a short registration questionnaire found on this web site. For more information regarding registration instructions, see INSTRUCTIONS TO BIDDERS, Section 00200, included in the project bid documents viewable on the web site. Questions regarding electronic bidding should be directed to City Purchasing Officer at ebidsa,ci.pearland.tx.us. All Bids submitted electronically will remain confidential until the opening date and time when they will be opened and read into the public record. Bids, shall be submitted on the form provided in the E-bid System and submitted electronically through this system to the City Purchasing Officer, City of Pearland, City Hall located at 3519 Liberty Drive, Pearland, Texas 77581. Electronic bids will be accepted until 2:00 p.m., ran\ Thursday, April, 25 2013. All Bids shall reference the following project information in the appropriate locations in provided electronic format. All properly submitted bids shall be publicly "opened" and read aloud into the public record following the closing of the acceptance period for the construction of: Quiet Zone Crossing And Median Improvements City of Pearland,Texas COP PN: TR1002 BID NO.: 1213-15 A mandatory pre-bid conference will be held at the City of Pearland City Hall at 3519 Liberty Drive, Pearland,Texas 77581 at 2:00 p.m. on April, 17, 2013. The project will entail the improvements to the median and BNSF railroad crossing located on Broadway(518). 10-2012 00100- 1 of 3 CITY OF PEARLAND INVITATION TO BID rIP's Upon award of a contract, the successful Bidder will be required to utilize the City's web based project management software, "Pro-Trak" for the administration of the construction project, including but not limited to, all transmittals and material submittals, RFI's, RFC's, Change Orders, Applications for Payment and all project communications with the City, its Construction Manager and Engineer. This system has certain hardware, internet access and operation requirements that form the basis for all project communications, documentation and records for the project. For more information, see INSTRUCTIONS TO BIDDERS, Section 00200. Electronic Bid Documents: including Contract Documents, Plans and Technical Specifications are available for download on the City's Website at: www.cityofpearland.org/bids upon registration. The documents are NOT viewable without registration. These same documents are also available at the following locations. City of Pearland, City Hall (281) 652-1600 Purchasing Department 3519 Liberty Drive Pearland,Texas 77581 Amtek Plan Room (713) 956-0100 4001 Sherwood Houston, TX 77092 The Associated General Contractors of America, Inc. (713) 334-7100 2400 Augusta, Suite 350 Houston, TX 77057 Virtual Builders Exchange (832) 613-0201 7035 W.Tidwell Building J, Suite 112 Houston,TX 77092 McGrawHill Construction—Dodge Reports 1-800-393-6343 No plan fees or deposits are required for plans and bid documents obtained through the City's E- bid System. BIDDERS MUST REGISTER AS A SUPPLIER ON THE CITY'S E-BID SYSTEM IN ORDER TO SUBMIT A BID EVEN IF BID DOCUMENTS ARE OBTAINED VIA ONE OF THE PLAN HOUSES. Bidders accept sole responsibility for downloading all of the required documents, plans, specifications bid forms and addenda required for bidding. No bid may be withdrawn or terminated for a period of ninety (90) days subsequent to the bid opening date without the consent of the City of Pearland. Unless otherwise expressly provided herein, all references to"day(s)"shall mean calendar day(s). (Ir.\ Bid Security and Bonds: Bid Security in the form of Cashier's Check, Certified Check, or Bid Bond payable to the City of Pearland in the amount of 5% of the total base bid price must 10-2012 00100-2 of 3 CITY OF PEARLAND INVITATION TO BID (0", accompany each proposal. Bidders submitting bids electronically through the E-bid System shall scan and up-load a copy of the sealed Bid Bond as an attachment to their bid. Original documents for Bid Security shall be requested by the City from the lowest two bidders and delivered to the City's Purchasing Officer within 48 business hours of the Bid Opening. Bid Security shall be delivered to: Office of City Purchasing, Finance Department, 2nd Floor City Hall, 3519 Liberty Drive, Pearland,Texas 77581. The successful Bidder must furnish Performance and Payment Bonds as required by Chapter 2253 of the Texas Government Code or other applicable law, as amended, upon the form included in the Contract Documents, in the amount of one hundred percent (100%) of the contract price, such bonds to be executed by a corporate surety duly authorized to do business in the State of Texas, and named in the current list of"Treasury Department Circular No. 570", naming the City of Pearland, Texas as Obligee. Additionally, the successful bidder shall be required to provide a one year Maintenance Bond for the improvements installed as part of this work, as provided in the Special Conditions of Agreement. Equal Opportunity: All responsible bidders will receive consideration for award of contract without regard to race, color, religion, sex, or national origin. Selection Criteria: The Contract is to be awarded on the basis of Lowest Responsible Bidder. In identifying this criteria the City will consider: 1) lowest total bid price for all work listed and specifically requested, including but not limited to: Base Bid, Extra Work items and selected Alternates. The City of Pearland reserves the right to award a contract based on any combination of the above considered to be in its best interests or to reject any or all bids. A bid that has been "opened" may not be changed for the purposes of correcting an error in the bid price. Young Lorfing,TRMS City Secretary, City of Pearland First Publication date April 3. 2013 Second Publication date April 10. 2013 10-2012 00100-3 of 3 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS Section 00200 INSTRUCTIONS TO BIDDERS 1. Defined Terms 1.1 The term "Owner" hereinafter is defined as the City of Pearland and is used interchangeably with the term "the City". Both terms are synonymous and refer to the City. 1.2 The term "Bidder" means one who submits a Bid Proposal directly to Owner, as distinct from a sub-bidder, who submits a bid to a Bidder. The term "Successful Bidder" means the lowest responsible Bidder to whom the Owner (on the basis of Owner's evaluation as hereinafter provided) makes an award. The term "Bid Documents" includes the Invitation to Bidders, Instructions to Bidders, the Bid Proposal, and the proposed Contract Documents (including all Addenda issued prior to receipts of bids). 1.3 The term "E-bid System"refers to the City's electronic bidding system. This is a web- based system that provides all Bid Documents electronically to potential Bidders and forms the pathway for interested Bidders to submit bids in response to advertisement and invitation. The term "e-bid" and/ or "electronic bid" means the Bidders' electronic response submitted on the electronic Bid Proposal to the Owner by way of the E-bid System. The terms "electronic bid" or"e-bid" are used inter-changeably to describe the above bid process to submit an authorized bid to the City in response to an Invitation to Bidders. 1.4 The term "Pro-Trak" means the City's web-based contract administration and construction records management system used by involved parties to administer the project. This system serves as the web accessed centralized information distribution hub for communications and document management, pay application processing and record retention for all project documentation. Operational instructions for this system will be issued to the successful Bidder at the pre-Construction Meeting. 1.5 All other definitions set out in the Contract Documents are applicable to terms used in the Bidding Documents. 1.6 Unless otherwise expressly provided herein, all references to "day(s)" shall mean consecutive calendar day(s). 2. Registration for E-bid System 2.1 The Owner's E-bid System is accessible via the City's web site at www.cityofpearland.org/bids. Bid documents can be viewed by simply selecting a specific project from the BID OPPORTUNITIES list and clicking on that project AFTER registration as a Supplier. Potential Bidders MUST REGISTER as a "Supplier" by clicking on the Supplier Registration button and completing the registration form. Registrants must provide data for all categories marked with a"*" and must select the following project bid categories: Building Construction Services,New(includes Maintenance and Repair) Construction Services, General " 10-2012 00200-1 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS (07 Construction Services, Heavy " Construction Services, Trade (new construction) Select the appropriate Time Zone for the Bidder's location and whether that location observes Daylight Savings time. Complete the registration information providing all required contact information and establish password security for the E-bid System. Once complete, "suppliers" will receive emails notifying of bid opportunities. Downloading any project bid data will automatically place the bidder's contact information on the list of plan holders list and the E- bid System will automatically send any and all updates, changes or addenda associated with that project. 2.2 The electronic Bid Proposal can only be submitted through this system. The form can be printed for Bidder's use, but the Bid Proposal MUST be submitted on the electronic form within the E-bid System. 2.3 Questions regarding use of the E-bid System may be directed by email to: eb ids@ci.pearland.tx.us. 3. Copies of Bidding Documents 3.1 Complete sets of "electronic" Bidding Documents are available for download to registered Bidders at No Cost from the City's E-bid System at: www.cityofpearland.org/bids. Interested Bidders must register as a "Supplier" on this site in order to receive the Bid Documents, and all Addenda or other notifications of changes, including communications from the Owner or Engineer. All Bid Documents are available to download and print. 3.2 The Bidder accepts sole responsibility for ensuring that he obtains a full set of these documents by completing the registration and executing a full and complete download of the project documents. Downloading of Bid Documents automatically ensures receipt of any and all subsequent communications from the City or its Engineer. 3.2 Copies of Bidding Documents are available or may be viewed at any of the Plan Houses listed in the Invitation to Bidders. It is recommended that all interested Bidders, whether bidding directly to the Owner or Sub-bidders bidding to a Bidder, register as a Supplier and download the project Bid Documents. 3.3 Complete sets of Bidding Documents must be used in preparing Bid Proposals; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents including, but not limited to all Addenda issued prior to bid. 3.4 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bid Proposals on the Work, and do not confer a license or grant for any other use. 4. Qualifications of Bidders 4.1 In determining to whom to award a contract, the City of Pearland may consider, in addition to the other selection criteria identified in section 16 of these Instructions to Bidders, the following Qualifications of Bidder, and each Bidder must be prepared to submit within two r".\ (2) days of Owner's request any or all of such Qualifications requested: 10-2012 00200-2 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS C"-,„ 1) A brief narrative of previous experience of the Bidder with projects of a similar nature and scope; 2) A list, including owner name and project location, of on-going projects and contracts for construction of projects of the Bidder which are not yet substantially complete; 3)A list of proposed subcontractors and suppliers for the project being bid; 4) A list of name, address and telephone number of references for projects completed by Bidder; and 5) A Financial Statement of Bidder, consisting of the balance sheet and annual income statement of Bidder for the Bidder's last fiscal year end preceding the submission of the Bid Proposal, which has been audited or examined by an independent certified public accountant. The Financial Statement of Bidder shall be used to determine a Bidder's net working capital, which is defined as current assets less current liabilities. A Bidder's net working capital shall be considered evidence of the Bidder's ability to provide sufficient financial management of the project being bid. The Bidder's Financial Statement shall be clearly and conspicuously marked as "confidential", and shall be deemed and treated as confidential and excepted from the Public Information disclosure requirements of Texas Government Code Section 552.001 et seq., as such information, if released, would give advantage to a competitor or bidder, and/or would cause substantial competitive harm to Bidder. 5. Examination of Contract Documents and Site 5.1 It is the responsibility of each Bidder before submitting a Bid Proposal, to (a) examine the Bidding Documents thoroughly, (b) visit the site to become familiar with local conditions that may affect cost, progress, performance or furnishing of the Work, (c) consider federal, state and local laws and regulations that may affect cost, progress, performance or furnishing of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors, omissions or discrepancies in the Contract Documents, (f) to recognize and plan for use of the City's "Pro-Trak" software to administer the construction process and perform the work of the project. 5.2 Any reports of explorations and tests of conditions at the site which have been utilized by the Engineer in preparation of the Contract Documents will be made available to Bidders for review, but such reports are not part of the Contract Documents. Bidder may not and should not rely upon the accuracy of the data contained in such reports, interpretations or opinions contained therein, or the completeness thereof, for the purposes of bidding or construction. 5.3 Information and data reflected in the Contract Documents with respect to underground utilities, equipment or other underground facilities at or contiguous to the site is based upon information and data furnished to Owner and Engineer by owners of such underground facilities or others, and Owner does not assume responsibility for the accuracy or completeness thereof. 5.4 Before submitting a Bid Proposal, each Bidder will, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and underground facilities) at or contiguous to the site or otherwise which may 10-2012 00200-3 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS affect cost, progress, performance or furnishing of the Work and which Bidder deems necessary to determine its Bid Proposal prices for performing and furnishing the Work in accordance with the Contract Time, Contract Price and other terms and conditions of the Contract Documents. 5.5 On request in advance, Owner will provide each prospective Bidder access to the site to conduct such explorations and tests as each prospective Bidder deems necessary for submission of a Bid Proposal. Prospective Bidders shall fill all holes, clean up and restore the site to its former condition upon completion of such explorations. 5.6 The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands, access thereto or contractual arrangements for use by the Contractor required for temporary construction facilities or storage of materials and equipment are to be provided by Contractor. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by Owner unless otherwise provided in the Contract Documents. 5.7 The submission of a Bid Proposal will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid Proposal is premised upon performing and furnishing all of the Work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in, required by or reasonably inferred from the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 6. Interpretations and Addenda 6.1 All questions about the meaning or intent of the Contract Documents are to be directed to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered or transmitted by electronic means to all registered Bidders in the City's E-bid System. Questions received less than five (5) days prior to the date for opening of Bid Proposals may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 6.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by Owner or Engineer. Addenda will automatically be made available to all registered Bidders that have downloaded Bid Documents from the City's E-bid System. 7. Bid Security 7.1 Each Bid Proposal must be accompanied by bid security made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid Proposal price, in the form of a certified check, cashier's check or a Bid Bond("Bid Security"). 7.2 Bidders submitting bids through the E-bid System shall scan and up-load a copy of their Bid Security (sealed Bid Bond, Certified Check or Cashier's Check ) as an attachment to C.\ their electronic bid. Original documents for Bid Security shall be requested by the City 10-2012 00200-4 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS from the lowest two bidders and delivered to the City's Purchasing Officer within 48 business hours of the Bid Opening. Bid Security shall be delivered to: Office of City Purchasing, Finance Department, 2nd Floor City Hall, 3519 Liberty Drive, Pearland, Texas 77581. 7.3 The Bid Security of the Successful Bidder will be retained until such time as Bidder has executed the Standard Form of Agreement, and furnished the required Performance and Payment Bonds, whereupon the Bid Security of both bidders will be returned. If the Successful Bidder fails to execute and deliver the Standard Form of Agreement and furnish the required performance and payment bonds within ten (10) days after the Notice of Award, Owner may annul the Notice of Award and shall be entitled to make a claim against the Bid Security. The Bid Security of other Bidders will be retained until the Contract is awarded and the Standard Form of Agreement becomes effective, or all bids are rejected, whereupon Bid Security furnished by all such Bidders will be returned. 8. Contract Time 8.1 The number of days in which the Work is to be Substantially Completed, as set forth in the Bid Proposal form and the Standard Form of Agreement, subject to such extension of time as may be due under the terms and conditions of the Contract Documents ("Contract Time"). All references to"time" or"days" shall be interpreted as consecutive calendar days. 9. Liquidated Damages and Early Completion Bonus 9.1 Provisions for liquidated damages and early completion bonus, if any, are set forth in the Standard Form of Agreement. 10 Substitute or"Or-Equal" Items 10.1 The Contract, if awarded, will be on the basis of the selected materials and equipment described in the Plans or specified in the Specifications without consideration of possible substitute or "or-equal" items. Whenever it is indicated in the Plans or specified in the Specifications that a substitute or "or-equal" item of material or equipment may be furnished or used by the Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Agreement becomes effective. All "or-equal" references shall be interpreted to mean "or approved equal". The procedure for submission of any such application by Contractor and consideration by Engineer is set forth in the Contract Documents. 11. Bid Form 11.1 The Bid Proposal form (Section 00300 — Bid Proposal) is included with the Bidding Documents when downloaded. This Document must be printed and signed, as required below, and then uploaded as an Attachment to the Bid. All E-bids must be submitted on the City's official E-bid System Bid Proposal document. All blanks on the Bid Proposal form must be completed or filled in. The Bidder shall bid all Alternates, if any. Incomplete Bid Proposals may be cause for rejection. 11.2 Bid Proposals by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied be evidence of authority to sign) 10-2012 00200-5 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature. Once executed the document is to be uploaded as an attachment to the Bid. 11.3 Bid Proposals by partnerships must be executed in the partnership name and signed by a general partner, whose title must appear under the signature, and if a corporate general partner, executed as required above for corporations and the official address of the partnership must be shown below the signature. All names must be typed or printed below the signature. Once executed the document is to be uploaded as an attachment to the Bid. 11.4 The Bidder shall acknowledge receipt of all Addenda (the number of which must be filled in on the Bid Proposal form). 11.6 The address and telephone number for communications regarding the Bid Proposal must be shown on the Bid Proposal form. 12. Submission of Bid Proposals 12.1 The place, date and/or time designated for opening Bid Proposals may be changed in accordance with applicable laws, codes and ordinances. Any such changes to the Bid Schedule shall be made by Addenda. 12.2 Electronic Bids shall be submitted per the requirements, instructions, terms and conditions as stated in the registration and submittal instructions of the City's E-bid System electronic bidding software. All Bidders utilizing this system MUST register as a potential supplier, (Bidder). E-Bids are submitted directly via the City's Web based system located at www.cityofpearland.org/bids. Bid Proposals submitted after the bid date and time will be rejected. 13. Modification and Withdrawal of Bid Proposals 13.1 Prior to submission, E-bid Bid Proposals may be modified or withdrawn without prejudice. 13.2 Once submitted, Bid Proposals may only be modified by an appropriate document duly executed (in the manner that a Bid Proposal must be executed) and delivered to Office of City Purchasing, Finance Department, 2nd Floor City Hall, 3519 Liberty Drive, Pearland, Texas 77581 and submitted any time prior to the opening of Bid Proposals. 13.3 A Bidder may not modify or withdraw its Bid Proposal by facsimile or verbal means. A withdrawn Bid Proposal may be resubmitted prior to the designated time for opening Bid Proposals. No bid may be withdrawn or terminated for a period of sixty(60) days subsequent to the bid opening date without the consent of the City of Pearland. 13.4 If, within twenty-four (24) hours after Bid Proposals are opened, any Bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material mistake in the preparation of its Bid Proposal, that Bidder may request to withdraw its Bid Proposal and the bid security may be returned or, at the discretion of the Owner, Owner may make a claim against the bid security. Thereafter, that Bidder will be disqualified from further bidding on the Project to be provided under the Contract Documents. 10-2012 00200-6 of 8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS 14. Opening of Bid Proposals 14.1 Bid Proposals will be opened and (unless obviously non-responsive) read aloud publicly. An abstract of the amounts of the base Bid Proposals and major alternates (if any) will be made available to Bidders after the opening of Bid Proposals. Bid Proposals, in their entirety, shall be open for public inspection after the contract is awarded, with the exception of any trade secrets or confidential information contained therein, provided Bidder has expressly identified any specific information contained therein as being trade secrets or confidential information. 15. Bid Proposals to Remain Subject to Acceptance 15.1 All Bid Proposals will remain subject to acceptance for sixty (60) days after the day of the Bid Proposal opening, but Owner may, in its sole discretion, release any Bid Proposal and return the bid security prior to that date. 16. Award of Contract 16.1 Owner reserves the right to reject any and all Bid Proposals, to waive any and all informalities not involving price, time or changes in the Work and to negotiate contract terms with the Successful Bidder. Owner may reject a bid as non-responsive if: 1) Bidder fails to provide required Bid Security; 2) Bidder improperly or illegibly completes or fails to complete all information required by the Bidding Documents; 3) Bidder fails to sign the Bid Proposal or improperly signs the Bid Proposal; 4) Bidder qualifies its Bid Proposal; 5) Bidder tardily or otherwise improperly submits its Bid Proposal; 6) Bidder fails to submit the Qualifications of Bidder as required under section 3 of these Instructions to Bidders; or 7) Bid Proposal is otherwise non-responsive. Contracts are awarded on the basis of one of the following criteria: A) provision of the "Best Value"or B)Lowest Responsible Bidder 16.2 Best Value. In determining the best value for the Owner, and in determining to whom to award a contract, Owner may consider: 1) purchase price; 2) reputation of the Bidder and Bidder's goods or services; 3) quality of Bidder's goods or services; 4) extent to which the goods or services meet the Owner's needs; 5) Bidder's past relationship with the Owner; 6) impact on the ability of Owner to comply with laws and rules relating to contracting with historically underutilized businesses and nonprofit organizations employing persons with disabilities; 7) total long-term cost to Owner to acquire Bidder's goods or services; 8) the Qualifications of Bidder; and 9) any other relevant criteria specifically listed in the Bidding Documents. A contract to be awarded to the Bidder offering the Best Value may be let on either a lump sum basis or a unit cost basis dependent on the Bid Proposal format. 16.3 Lowest Responsible Bidder. In determining Lowest Responsible Bidder, Owner will consider: Lowest Total Bid price for all work including Base Bid, Extra Work and Alternates, if any, and any other cost criteria. Additional evaluation criteria may include: the Qualifications of the Bidders, whether or not the Bid Proposals comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Proposal form or prior to the Notice of Award. Discrepancies in the multiplication of units of 10-2012 00200-7of8 CITY OF PEARLAND INSTRUCTIONS TO BIDDERS rWork and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. A contract to be awarded to the Lowest Responsible Bidder may be let on either a lump sum basis or a unit cost basis dependent on the Bid Proposal format. Acceptance of any and all bids may be conditioned on compliance with the requirement for attendance of the mandatory pre-bid meeting. 16.4 In either case, Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid Proposal and to establish the responsibility, qualifications and financial ability of Bidders, proposed Subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents, to Owner's satisfaction,within the Contract Time. 17. Contract Security 17.1 When the Successful Bidder delivers the executed Standard Form of Agreement to Owner, it must be accompanied by the Performance, Payment, Maintenance and Surface Correction Bonds required by the Contract Documents. Bonds may be on the forms provided herein or an equal form containing no substantive changes, as determined by Owner. 18. Signing of Agreement C18.1 When Owner gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Standard Form of Agreement, and the required Performance and Payment Bond forms. Within ten (10) days thereafter Contractor shall sign and deliver the required number of counterparts of the Standard Form of Agreement to Owner with the required Bonds. Within ten (10) days thereafter, Owner shall deliver one fully signed counterpart to Contractor. There shall be no contract or agreement between Owner and the Successful Bidder until proper execution and attestation of the Standard Form of Agreement by authorized representatives of the Owner. 19. Pre-bid Conference 19.1 A pre-bid conference will be held as indicated in the Invitation to Bid. Attendance at the pre-bid conference is MANDATORY to fulfill the prerequisite requirements for Bidders bidding directly to the Owner. 20. Retainage 20.1 Provisions concerning retainage are set forth in the Contract cm,. END OF SECTION 10-2012 00200-8 of 8 CITY OF PEARLAND BID PROPOSAL Section 00300 BID PROPOSAL Part A Date: May 13, 2013 Bid of General Contractor Services, Inc. ,an individual proprietorship/a corporation organized and existing under the laws of the State of Texas/a partnership consisting of General Construction ,for the construction of: Quiet Zone Crossing And Median Improvments City of Pearland,Texas COP PN:TR1002 BID NO.: 1213-15 (Submitted in Electronic format) To: The Honorable Mayor and City Council of Pearland City of Pearland 3519 Liberty Drive Pearland,Texas 77581 Pursuant to the published Invitation to Bidders, and Instructions to Bidders, the undersigned Bidder hereby proposes to perform all the work and furnish all necessary superintendence, labor, machinery, equipment, tools and materials, and whatever else may be necessary to complete all the work described in or reasonably inferable from the Contract Documents for the construction of the Quiet Zone Crossing And Median Improvments, to the median and BNSF railroad crossing located on Broadway (518) with all related appurtenances, complete, tested, and operational, in accordance with the Plans and Specifications prepared by the Engineer, ARKK Engineers, LLC, 7322 Southwest Freeway, Suite 1040, Houston,Texas 77074, John D.Rudloff, for the unit prices or applicable prices set forth in Exhibit "A", the electronic bid form as contained in the City's E-bid system, which, once fully executed and submitted shall constitute a legal and executable proposal from the Bidder. It is understood that, in the event any changes are ordered on any part of the Work, the applicable unit prices bid shall apply as additions to or deductions from the total prices for the parts of the Work so changed. The Bid Security required under the Instructions to Bidders is included and has been uploaded as an attachment within the E-bid system and,that a fully executed, signed and sealed hard copy has been delivered to the Office of City Purchasing, Finance Department, 2nd Floor, City Hall, 3519 Liberty Drive,Pearland,Texas 77581. The Bidder agrees to submit to the Owner the Qualifications of Bidder, including the Financial Statement of Bidder,as required by the Instructions to Bidders if requested to do so as a condition of the Bid review. The Bidder binds himself, upon acceptance of his proposal, to execute the Standard Form of Agreement and furnish an acceptable Performance and Payment Bond and Maintenance Bond , each in the amount of one hundred percent (100%) of the total Contract Price, according to the forms included in the Contract Documents, for performing and completing the said work within Bidder's Initial's: 10-2012 00300-1 of 3 CITY OFPEARLAND BID PROPOSAL the time stated and for the prices stated in Part B of this proposal along with all required insurance in the required amounts. The undersigned Bidder agrees to commence work within 10 days of the date of a written Notice to Proceed. It is understood that the Work is to be Substantially Complete within ninety(90)days after the date of the Notice to Proceed. Time for Substantial Completion shall begin on the date established by the Notice to Proceed. The Contractor will pay liquidated damages in the amount(s) specified in Document 00500—Standard Form of Agreement, in the event the Work is not Substantially Complete within the Contract Time. The undersigned agrees that the amounts bid in this Bid Proposal will not be withdrawn or modified for ninety (90) days following date of Bid Proposal opening, or such longer period as may be agreed to in writing by the City of Pearland and Bidder. It is understood that in the event the Successful Bidder fails to enter into the Standard Form of Agreement and/or to furnish an acceptable Performance and Payment Bond [and Maintenance Bond, each in the amount of one hundred (100) percent of the Contract Price, along with all required insurance in the stated amounts within ten (10) days of the Notice of Award, the Successful Bidder will forfeit the Bid Security as provided in the Instructions to Bidders. Unless otherwise expressly provided herein,all references to"day(s)"shall mean calendar day(s). The Bidder acknowledges that the following Addenda have been received. The modifications to the Bidding Documents noted therein have been considered and all costs thereto are included in the Bid Proposal prices. ' Addendum No.: Date: Addendum No.: Date: Addendum No.: Date: Addendum No.: Date: Bidder hereby represents that the only person or parties interested in this offer as principals are those named. Bidder has not directly or indirectly entered into any agreement,participated in any collusion,or otherwise taken any action in restraint of free competitive bidding. Firm N e: General Contractors- ices, Inc, By: �,� �'lc-e_Q .r7(1, Title: Pamela Teltschick`/ President Address: 8400 La Porte Rd Houston, Texas 77012 Phone No: 713-270-5300 ATTEST: - Michelle Lincoln (Seal,if Bidder is a Corporation)`- _ (Typed or Printed am ) Signature - Date: May 13. 2013 - Bidder's Initial's: 10-2012 00300-2 of 3 CITY OF PEARLAND BID PROPOSAL , END OF SECTION C Bidder's Initial's: 10-2012 00300-3 of 3 City of Pearland Texas (Projects Department) Supplier Response Bid Information Contact Information Ship to Information Bid Creator Patty Patke Program Address 3519 Liberty Drive Address 3519 Liberty Drive Specialist Suite 201 Email ppatke@ci.pearland.tx.us Pearland,TX 77581 Pearland,TX 77581 Phone (281)652-1756 Contact Patty Patke Contact Fax (281)652-1706 Projects Department Department Bid Number 1213-15 Building City Hall Building City Hall Title Quiet Zone Crossing and 2nd Floor Median Improvements Floor/Room Floor/Room (Broadway at BNSF Railway) Telephone (281)652-1756 Telephone 281 (652) 1738 Bid Type Invitation to Bid Fax (281)652-1706 Fax Issue Date 04/03/2013 Email Email ebids@ci.pearland.tx.us Close Date 4/25/2013 2:00:00 PM CT ppatke@ci.pearland.tx.us Need by Date Supplier Information Company General Contractor Services, Inc. Address 8400 La Porte Rd Houston, TX 77012 Contact Department Building (gillb\' Floor/Room Telephone 713(270)5300 Fax 713(270)5305 Email Submitted 4/25/2013 12:55:31 PM CT Total $141,240.00 Signature Supplier Notes Bid Notes The Project entails construction of improvements to the median and BNSF railroad crossing located on Broadway(518). Bid Activities Date Name Description 4/17/2013 2:00:00 PM Mandatory Pre-Bid Conference A Mandatory Pre-Bid Conference will be held at the City of Pearland City Hall at 3519 Liberty Drive,Pearland,Texas 77581 at 2:00 p.m.on April 17,2013. Bid Messages 1213-15-Page 1 of 4 Please review the following and respond where necessary # Name Note Response 1 Response Attachment Bidder understands and has completed the following:The Submitted Bid Proposal and Bid Security required under the Instructions to Bidders has been uploaded as an attachment within the E-bid system and,a fully executed, signed and sealed hard copy of the Bid Bond will be delivered upon request to the Office of City Purchasing, Finance Department, 2nd Floor,City Hall,3519 Liberty Drive,Pearland,Texas, 77581. 2 Non-collusion Statement Bidder has submitted a completed and signed copy of the Submitted Non-Collusion Statement 3 General Conditions Bidder has read and agrees to the General Conditions set Agrees forth by the City of Pearland. 4 Specification Acknowledgement Bidder has reviewed specifications and agrees that their Agrees bid adheres fully. 5 Local Bidder Bidder claims Pearland local bidder preference,pursuant Not Local Bidder to provisions of Local Bidder Preference claim form and Texas Local Government Code,Chapter 271.9051 fl C 1213-15-Page 2 of 4 Line Items # Qty UOM Description Response \\ 1 1 LS IMPROVEMENTS TO THE MEDIAN AND BNSF RAILROAD CROSSING LOCATED AT W. $120,860.00 BROADWAY STREET(FM518).INCLUDING BUT NOT LIMITIED TO LIMITED TO REMOVAL AND REPLACEMENT AND/OR INSTALLATION OF ASPHALT PAVING, CONCRETE DRIVEWAYS,CONCRETE CURBSB(ALL TYPES), CONCRETE MEDIANS STRIPING, REGRADING, PERMITTING, SWPPP,AND TRAFFIC CONTROL. Item Notes: See plans and project manual for reference. Supplier Notes: 2 1 PKG Extra work items must be approved by the Engineer and City of Pearland $20,380.00 Item Notes: Supplier Notes: Package Line Items:If responding to this package,all line items in the package are required # Qty UOM Description Response 2.1 70 SY 6"hot mix asphalt base course 50.00 Item Notes: TxDOT 292 Supplier $50 x 70 sy Notes: 2.2 70 SY 2"Type D HMAC overlay, including tack coat 38.00 Item Notes: TxDOT 340 Supplier $38 x 70 sy Notes: 2.3 40 SY Remove&replace 6"concrete driveway 60.00 Item Notes: TxDOT 530 Supplier $60 x 40 sy Notes: 2.4 70 SY 6"Concrete median 90.00 Item Notes: TxDOT 536 Supplier $90 x 70 sy Notes: 2.5 60 LF 1-foot wide reinforced doweled slotted curb 40.00 Item Notes: TxDOT 529 Supplier $40 x 60 If Notes: (0"N, 1213-15-Page 3 of 4 CAT°.) 2.6 60 LF Type I monolithic concrete curb and gutter 20.00 Item Notes: TxDOT 529 Supplier $20 x 60 If Notes: 2.7 60 LF Type II monolithic concrete curb and gutter 20.00 Item Notes: TxDOT 529 Supplier $20 x 60 If Notes: 2.8 60 LF 6"reinforced doweled curb on existing pavement 12.00 Item Notes: TxDOT 529 Supplier $12 x 60 If Notes: Response Total: $141,240.00 ri*s\ (11/1*\,, 1213-15-Page 4 of 4 CITY OFPEARLAND STANDARD FORM OF AGREEMENT Section 00500 STANDARD FORM OF AGREEMENT THIS AGREEMENT is by and between City of Pearland(hereinafter called OWNER or City)and General Contractor Services. Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK CONTRACTOR shall complete all work as specified or indicated in or reasonably inferable from the Contract Documents (hereinafter the "Work"). The Work is generally described as follows: Quiet Zone Crossing And Median Improvements Broadway(518)At BNSF Railway City of Pearland,Texas COP PN:TR1002 BID NO.: 1213-15 Article 2. ENGINEER • The Work has been designed by ARKK Engineers, LLC, 7322 Southwest Freeway, Suite 1040, Houston, Texas 77074, John D. Rudloff who is hereinafter called ENGINEER and who is to assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. CONTRACT TIME 3.1 The Work will be Substantially Complete (as defined in Article 1 of the General Conditions)within 90 days(including weekends and holidays) from the date when the Contract Time commences to run as provided in paragraph 5.01 of the General Conditions (as revised in the Special Conditions if applicable), and completed and ready for Final Payment within 120 days from the date when the Contract Time commences to run. No work will be allowed on Sundays. 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer fmancial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 5 of the General Conditions. OWNER and CONTRACTOR also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration preceding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof,OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER five hundred dollars($500.00) for each day that expires after the time specified in paragraph 3.1 10-2012 00500-1 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time set out in the Certificate of Substantial Completion or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER five hundred dollars ($500.00) for each day that expires after the time specified in the Certificate of Substantial Completion for completion and readiness for Final Payment. 3.3 Inspection Time. Working hours for the Pearland Inspection personnel are from 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding City approved holidays. The Contractor shall notify the OWNER of any required inspection overtime work at least 48 hours in advance and shall pay the overtime wages for the required City inspections. Article 4. CONTRACT PRICE 4.1 OWNER shall pay CONTRACTOR for completion of the Work in strict accordance with the Contract Documents in current funds [$###,###.## edit as required] (the"Contract Price"). The Contract Price includes the Base Bid [and Alternate(s)#, #, #, &#, as accepted by OWNER and edit as required] as shown in Document 00300—Bid Proposal. C.I6\ Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Section 6.0 "Measurement and Payment" of the General Conditions. Application for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1 Progress Payments. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER as provided below. All progress payments will be on the basis of the progress of the Work and actual quantity of Work completed, in accordance with Article 6 "Measurement and Payment"of the General Conditions. 5.1.1 Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage or actual quantity of Work complete, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with the General Conditions. The OWNER shall make payment within 30 days of receipt of application for payment by the ENGINEER. 5.1.2 Each progress payment shall be less retainage as specified in Paragraph 6.06 of the General Conditions, and further less all previous payments and all further sums that may be retained by the OWNER under the terms of this Agreement. It is understood, however, that in case the whole work be near to completion and some unexpected and unusual delay occurs due to no ` fault or neglect on the part of the CONTRACTOR, the OWNER may upon written recommendation of the ENGINEER pay a reasonable and equitable 10-2012 00500-20f7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT C16\ portion of the retained percentage to the CONTRACTOR, or the CONTRACTOR at the OWNER's option, may be relieved of the obligation to fully complete the Work and, thereupon, the CONTRACTOR shall receive payment of the balance due him under the contract subject only to the conditions stated under"Final Payment." 5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 6.09of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 6.09. Article 6. INTEREST Interest on any overdue payment from OWNER to CONTRACTOR shall be paid in accordance with the provisions of Chapter 2251.025 of the Texas Government Code, as amended. Article 7. CONTRACTOR'S REPRESENTATIONS In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations: 7.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract C."\ Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. 7.2 CONTRACTOR has studied carefully all available surveys, assessments, reports of explorations, investigations, and tests of subsurface conditions and drawings of physical conditions of the site. Such technical reports and drawings are not Contract Documents, and Owner makes no representations or warranties as to the accuracy of such documents or information, or to whether or not they are complete, comprehensive, or all-inclusive. 7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraphs 7.2 above) which pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work ,and CONTRACTOR assumes the risk of such subsurface and physical conditions, and shall furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, explorations,tests, reports, and studies or similar information or data are or will be required by CONTRACTOR for such purposes. 7.4 CONTRACTOR has reviewed and checked all information and data shown or C.6.‘‘ indicated on the Contract documents with respect to existing underground facilities at or contiguous to the site and assumes responsibility for the accurate location of 10-2012 00500-3 of 7 CITY OFPEARLAND STANDARD FORM OF AGREEMENT said underground facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said underground facilities are or will be required by CONTRACTOR in order to perform and finish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents. 7.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, explorations, tests, reports, and studies with the terms and conditions of the Contract Documents. 7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies in the Contract Documents of which Contractor knew or should have known, and CONTRACTOR shall perform the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including any written resolution of any such conflict, error or discrepancy by ENGINEER. In the event of a conflict that was not brought to the OWNER's or ENGINEER's attention prior to the bid, the CONTRACTOR is assumed to have bid the most expensive alternative. Article 8. CONTRACT DOCUMENTS The Contract Documents, which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work, consist of the following, each of which are incorporated herein by reference: 8.1 Standard Form of Agreement(Section 00500). 8.2 Performance, Payment, and/or Maintenance Bonds (Sections 00610, 00611, and 00612). 8.3 General Conditions of Agreement (Section 00700), including Attachment No. 1 Workers' Compensation Insurance Coverage, Attachment No. 2 Agreement for Final Payment and Contractor's Sworn Release, and Attachment No. 3 Owner's Insurance Requirements of Contractor. 8.4 Special Conditions of Agreement(Section 00800). 8.5 Plans, consisting of sheets numbered 1 through 7 inclusive with attachments with each sheet bearing the following general title: Quiet Zone Railroad Crossing (FM518) 8.6 Instructions to Bidders and CONTRACTOR's Bid Proposal, including any Addenda referenced therein. 8.7 Technical Specifications for the Work. 8.8 The following, which may be delivered or issued after this Agreement becomes effective: Any Change Orders or other documents amending, modifying, or 74`. supplementing the Contract Documents in accordance with the General Conditions. 10-2012 00500-4 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT There are no Contract Documents other than those listed above in this Article 8. The Contract Documents may only be amended,modified or supplemented as provided in the General Conditions. Article 9. MISCELLANEOUS 9.1 Terms used in this Agreement which are defined in Section 1, "Definitions and Interpretations" of the General Conditions will have the meanings indicated in the General Conditions. 9.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representative to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents. 9.4 CONTRACTOR agrees to warranty the Work for a period of one (1) year from Substantial Completion against defects in materials and workmanship. CONTRACTOR agrees to repair or replace any defective work within this warranty period immediately unless such repairs require long lead time materials and equipment in which case CONTRACTOR shall provide an agreeable schedule for repairs at no additional cost to OWNER. 9.5 The Work will be completed according to the Contract Documents and in accordance with codes, ordinances, and construction standards of the City of Pearland, and all applicable laws, codes and regulations of governmental authorities. 9.6 In the event any notice period required under the Contract Documents is found to be shorter than any minimum period prescribed by applicable law, the notice period required shall be construed to be the minimum period prescribed by applicable law. 9.7 This Contract and the Contract Documents, insofar as they relate in any part or in any way to the Work undertaken therein, constitute the entire agreement between the parties hereto, and it is expressly understood and agreed that there are no agreements or promises by and between said parties, except as aforesaid, and that any additions thereto or changes shall be in writing. 9.8 The provisions of this Contract shall be applied and interpreted in a manner rib\ consistent with each other so as to carry out the purposes and the intent of the parties, but if for any reason any provision is unenforceable or invalid, such 10-2012 00500-5 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT provisions shall be deemed severed from this Contract and the remaining provisions shall be carried out with the same force and effect as if the severed provision had not been part of this Contract. 9.9 The headings of the paragraphs are included solely for the convenience of reference and if there is any conflict between the headings and the text of this Contract, the Contract text shall control. 9.10 The waiver of any breach hereof shall not constitute a waiver of any subsequent breach of the same or any other provision hereof. Failure by the OWNER in any instance to insist upon observance or performance by CONTRACTOR shall not be deemed a waiver by CONTRACTOR of any such observance or performance. No waiver will be binding upon OWNER unless in writing and then will be for the particular instance only. Payment of any sum by OWNER to CONTRACTOR with knowledge of any breach or default will not be deemed a waiver of such breach or default or any other breach or default. 9.11 The CONTRACTOR acknowledges that the OWNER(through its employee handbook) considers the following to be misconduct that is grounds for termination of an employee of the OWNER: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting Csb\, reimbursement of expenses made for the benefit of the OWNER. The CONTRACTOR agrees that it will not, directly or indirectly; cause an employee of the OWNER to engage in such misconduct. 10-2012 00500-6 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT 1N WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to OWNER and one to CONTRACTOR. This Agreement will be effective upon execution and attestation by authorized representatives of the City of Pearland and upon the following date: May 13 ,2013. OWNER: CONTRACTOR: CITY OF PE General Contractor Services Inc. By: By: A. Title: Title: Pamela Teltsch'ck President Date: 0 0/. Date: May 13, 2013 - • (Corporate Seal) A1'1'EST ATTEST -Mr /M46)- D‘ Address for giving notices Qti1"1 ' 8400 La Porte Rd Rt,,gy . Houston, Texas 77012 iH .f0111111.... Phone: 713-270-5300 Fax: 713-270-5305 Agent for service of process: END OF SECTION 10-2012 00500-7 of 7 C Bond No. 4391321 CITY OF PEARL.LND PERFORMANCE BOND Section 00610 PERFORMANCE BOND STATE OF TEXAS § COUNTY OF BRAZORIA § KNOW ALL MEN BY THESE PRESENTS:That General Contractor Services, zna the City of city of Houston County of Harris and State of Texas, as principal, and SureTec Insurance Company authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee (Owner), in the penal sum ofS One Hundred Forty One Thousand*for the payment whereof_ the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns,jointly and severally, by these presents: **Two Hundred Forty and No/l00 ($141,240.00---) WHEREAS. the Principal has entered into a certain written contract with the Owner, effective as of the /311 day of in Gt , 20/3. (the "Contract') to commence and complete the construction of certain impthvements described as follows: Quiet Zone Crossing And Median Improvements Broadway(FM 518)at BNSF Railway City of Pearland,Texas COP PN: TR1002 777 BID NO.: 1213-15 which Contract, including the Contract Documents as defined therein. is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Contract Work and shall in all respects duly and faithfully observe and perform all and singular the covenants, conditions, and agreements in and by said Contract agreed and covenanted by the Principal to be observed and performed, and according to the true intent and meaning of said Contract and Contract Documents, then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the Work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond,and it does hereby waive notice of any such change,extension of time,alteration or addition to the terms of the Contract,or to the Work to be performed thereunder. t_�l2U07 00610- Iof2 CITY OF PF4RL.4ND PERFORMANCE BOND IN WITH SS WHEREOF, the said Principal and Surety have signed and sealed this instrument this Jay of ��LLI .20j_ Principal: Surety: General Contractor Services, Inc. SureTe� nce Company,- By: g - " Kevin c uain Title: PfleSi 1,e�,� Title: Attorney-in-Fact = ` - Address: Address: __, . . . 8400 La Porte Road 1330 Post Oak Blvd. , Ste.=110-0 Houston, TX 77012 Houston. TX 77056 -. Telephone: 713-2 7 0-5 3 00 Telephone: 713-812-0 8 0 0 Fax: 713-270-5305 Fax: 713-812-0406 NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. END OF SECTION 12/2007 00610-2 of 2 Bond No. 4391321 cm-OFPEARL ND PAYMENT BOND Section 00611 PAYMENT BOND STATE OF TEXAS § COUNTY OF BRAZORIA § General Contractor Services, Inc. KNOW ALL MEN BY THESE PRESENTS:That of the City of city of Houston .County of Harris , and State of Texas, as principal, and SureTec Insurance Company authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee (Owner),in the penal sum of SOne Hundred Forty One Thousand**for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns,jointly and severally,by these presents: **Two Hundred Forty and No/100 ($141,240.00--) WHEREAS, the Principal has entered into a certain written contract with the Owner, effective as of the /3 day of CC(J , 20/3 , (the "Contract") to commence and complete the construction of certain improvements described as follows: Quiet Zone Crossing And Improvements Broadway(518)At BNSF Railway City of Pearland,Texas COP PN: TR1002 BID NO.: 1213-15 which Contract, including the Contract Documents as defined therein, is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor or material to him or a subcontractor in the prosecution of the Work provided for in said Contract, then, this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the Work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract,or to the Work to be performed thereunder. r07/2006 0061 I -1 of CITY OF PEARLAND PAYMENT BOND IN WITNXSS WHEREOF, the said Principal and Surety have si`ned and sealed this instrument this ay of ,2013 Principal: Surety: General Contractor Services, Inc. SureTec -' ce Company By: A By: /- - ,,? / K uain Title: T M(Sfo-e�, Title: Attorney-in-Fact Address: Address: 8400 La Porte Road 1330 Post Oak Blvd., Ste. 1100 ~ Houston, TX 77012 Houston, TX 77056 Telephone: 713-270-5300 Telephone: 713-812-0800 Fax: 713-270-5305 Fax: 713-812-0406 NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. END OF SECTION 07/2006 00611 -2 of 2 Bond No. 4391321 CITY OFPEARLAND ONE-YEAR MAINTENANCE BOND - Section 00612 ONE-YEAR MAINTENANCE BOND STATE OF TEXAS § COUNTY OF BRAZORIA § KNOW ALL MEN BY THESE PRESENTS:That General Contractor Services, Inc.of the City of city of Houston ,County of Harris , and State of Texas, as principal, and SureTec Insurance Company authorized under the Iaws of the State of Texas to act as surety on bonds for principals, are held and finely bound unto City of Pearland as Obligee (Owner),in the penal sum of S°ne Hundred Forty One Thousand**for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns,jointly and severally,by these presents: **Two Hundred Forty and No/10 0 ($141,240 . 00---) WHEREAS_ the Principal has entered into a certain written contract with the Owner, effective as of the J3f day of rna/ , 20/3, (the "Contract") to commence and complete the construction of certain improvements described as follows: Quiet Zone Crossing And Median Improvements Broadway(518)At BNSF Railway City of Pearland,Texas COP PN:TR1002 BID NO.: 1213-15 which Contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully correct all such work not in accordance with the Contract Documents discovered within the one-year period from the date of substantial completion, then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract,or to the work to be performed thereunder. 07/2006 00612- 1 of 2 CITY OFPF4RLAND ONE-YEAR MAINTENANCE BOND IN WIT4SS WHEREOF, the said Principal and Surety have signed and sealed this instrument this "day of Principal: Surety: General Contractor Services, Inc. SureTe / ance Company By: iirvz_P�� _ �22 K ain Title: ?MS/deg Title: Attorney-in-Fact Address: Address: 8400 La Porte Road 1330 Post Oak Blvd. , Ste. 1100 Houston, TX 77012 Houston, TX 77056 Telephone: 713-2 7 0-5 3 0 0 Telephone: 713-812-0 8 0 0 Fax: 713-270-5305 Fax: 713-812-0406 NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. END OF SECTION 07/2006 00612-2 of 2 POA#: 4221392 SureTec Insurance Company -: - LIMITED POWER OF ATTORNEY Know All Men by These Presents, That.SURETEC INSURANCE COMPANY (the "Company"), a corporation duly-organized"and - existing under the laws of the State of Texas, and having its principal office-in Houston,-Hams County,Texas, does by these presents -make,constitute and appoint Maxine Elaine Lewis, Rosalyn D.Hassell,Scott D.Chapman, Kevin McQuain,Justin McQuain,Jeanne M. Buchan, Keith M. Illa -its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute,"acknowledge - and deliver any and all bonds, recognizances,undertakings or other instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for: Five Million and 00/100 Dollars($5,000,000.00)- and to bind the Company thereby as fully and.to the same extent as if such bond were signed'by the President, sealed with the.corporate seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all'that the said Attorney-in=Fact may do in the premises. Said appointment shall continue in force.until: . 12/31/2013 and is made under and by authority of the following - resolutions of the Board of Directors of the SureTec"Insurance Company: . Be it Resolved that the President, any Vice-President, any Assistant Vice-President,any Secretary or any Assistant Secretary shall he and is hereby vested-with full power and authority to appoint any one or-more suitable persons as-Attorney(s)-in-Fact to represent and act for and on behalf of theCompany subject to the following provisions: Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and deliver,any and all bonds,recognizances,contracts,agreements Or indemnity and other conditional or obligatory undertakings and any and all.- notices and documents canceling or terminating the Company's_liability thereunder,-and any such instruments so executed by any such Attorney-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.. - Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore-or"hereafter affixed to any power"of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile sealshall be valid and binding upon the Company with respect to any bond or undertaking-to which it is attached. (Adopted at a meeting held on 20th of April, 1999.) • In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal - to be hereto affixed this 3rd day of September,A.D.2010. mW SURETEC INSU E C! 'ANY. uRANc7S, W°/ X409 .o._ By: - ua�`' 1 y - - John . • Jr., 'resident - State of Texas ss: �c' f. County of Harris *�, On this 3rd day of September,A.D.2010 before me personally came John Knox Jr.,to me known,who,-being by me duly sworn,did depose and say,that he resides in Houston,Texas, that he is President of SURETEC INSURANCE COMPANY,the company-described in and which executed the above instrument;that he knows the seal of said Company;that the seal affixed to said instrument-is such corporate seal;that it was-so affixed by order of the Board of Directors of said Company;and that he signed his name thereto by like order. ..0.0.r":Nt-". JACQUELYN MALDONADO - ✓. kc - i '•� Notary Public,State of Texas . • �`j M Commission Expirescq ely aldo ado,Notary.Public ",$_ y comet Sion ex es May 18,2013 „,�o�,,, May 18,201"3 Y I,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney,executed by said Company,which is still in full force and effect;and-furthermore,the resolutions of the Board-of Directors,set out in the Power of Attorney are in full force and effect. _ Given under my hand and the seal of said Company at Houston, Texas this day of_ - , - - , A.D.- - - -- M.Brent Beaty,Assistant Secretary Any instrument issued in excess of the penalty stated above.is totally void and without any validity. For verification of the authority of this power you may call(713)812,0800 any business day between 0:00 am and 5:00 pm CST. SureTec Insurance Company THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION Statutory Complaint Notice To obtain information or make a complaint:You may call the Surety's toll free telephone number for information or to make a complaint at: 1-866-732-0099.You may also write to the Surety at: SureTec Insurance Company 9737 Great Hills Trail,Suite 320 Austin,Tx 78759 You may contact the Texas Department of Insurance to obtain information on companies,coverage,rights or complaints at 1-800-252-3439.You may write the Texas Department of Insurance at: PO Box 149104 Austin,TX 78714-9104 Fax#:512-475-1771 Web:http://www.tdi.state.tx.us Email:ConsumerProtection@tdi.state.tx.us PREMIUM OR CLAIM DISPUTES:Should you have a dispute concerning your premium or about a claim,you should contact the Surety first. If the dispute is not resolved,you may contact the Texas Department of Insurance. Terrorism Risks Exclusion The Bond to which this Rider is attached does not provide coverage for,and the surety shall not be liable for,losses caused by acts of terrorism, riot,civil insurrection,or acts of war. CITY OFPEARLAND PARTIAL WAIVER OF LIEN Section 00615 PARTIAL WAIVER OF LIEN AND PAYMENT AFFIDAVIT The undersigned contracted with City of Pearland to furnish in connection with certain improvements to real property located in the City of Pearland, TX and owned by the City of Pearland which improvements are described as follows: In consideration of Pay Estimate No. in the amount of$ the undersigned, on oath, states that all persons and firms who supplied labor and materials to the undersigned in connection with said Project will be fully paid within 30 days of the date of this document by the undersigned for such work through In consideration of the payment herewith made, the undersigned does fully and finally release and hold harmless the City of Pearland and its surety, if any,through the above date from any and all claims, liens, or right to claim or lien, arising out of this Project under any applicable bond, law or statue. It is understood that this affidavit is submitted to induce payment of the above (11.6.` sum and for use by the City of Pearland in assuring the Owner and others that all liens and claims relating to the said Project furnished by the undersigned are paid. Signature Printed Name&Title Company Name State of County of Subscribed and sworn to,before me, this day of , 20 . My Commission Expires: Notary Public (fili..\, _ 5-12-12 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT rb.\ Section 00700 GENERAL CONDITIONS OF AGREEMENT TABLE OF CONTENTS Page No. 1.0 DEFINITIONS AND INTERPRETATIONS 1 1.01 Owner, Contractor and Engineer 1.02 Contract Documents 1.03 Subcontractor 1.04 Written Notice 1.05 Work 1.06 Extra Work 1.07 Work Day 1.07-1 Rain Day 1.07-2 Impact Day 1.08 Calendar Day 1.09 Substantially Completed 1.10 Interpretation of Words and Phrases 1.11 Referenced Standards 1.12 Contract Time 1.13 Construction Inspector 1.14 Balancing Change Order 2.0 RIGHTS AND RESPONSIBILITIES OF THE OWNER 4 2.01 No Warranty of Design 2.02 Right of Entry 2.03 Ownership of Plans 10-2012 00700-i CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 2.04 Changes and Alterations 7 2.05 Damages 3.0 RIGHTS AND RESPONSIBILITIES OF THE ENGINEER 6 3.01 Owner-Engineer Relationship 3.02 Keeping of Plans and Specifications Accessible 3.03 Preliminary Approval 3.04 Inspection by Engineer 3.05 Determination of Questions and Disputes 3.06 Recommendation of Payment 4.0 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR 8 4.01 Independent Contractor 4.02 Contractor's Understanding 4.03 Laws and Ordinances 7 4.04 Assignment and Subletting 4.05 Performance and Payment Bonds [and Maintenance Bond] 4.06 Insurance 4.07 Permits and Fees 4.08 Texas State Sales Tax 4.09 Contractor's Duty and Superintendence 4.10 Character of Workers 4.11 Labor,Equipment,Materials, Construction Plant and Buildings 4.12 Sanitation 4.13 Cleaning and Maintenance 4.14 Performance of Work 4.15 Right of Owner to Accelerate the Work 7 10-2012 00700-ii CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.16 Layout of Work 4.17 Shop Drawings 4.18 Engineer-Contractor Relationship; Observations 4.19 Observation and Testing 4.20 Defects and Their Remedies 4.21 Liability for Proper Performance 4.22 Protection Against Accident To Employees and the Public 4.23 Protection of Adjoining Property 4.24 Protection against Claims of Subcontractors, Laborers,Materialmen, and Furnishers of Equipment,Machinery and Supplies 4.25 Protection Against Royalties or Patented Invention 4.26 Indemnification 4.27 Losses From Natural Causes 4.28 Guarantee 5.0 PROSECUTION AND PROGRESS 18 5.01 Time and Order of Completion 5.02 Extension of Time 5.03 Hindrances and Delays 5.04 Suspension of Work 5.05 Liquidated Damages for Delay 5.06 Change of Contract Time 5.07 Delays Beyond Owner's and Contractor's Control 6.0 MEASUREMENT AND PAYMENT 21 6.01 Discrepancies and Omissions .1"'` 6.02 Quantities and Measurements \\ 10-2012 00700-iii CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 6.03 Estimated Quantities 6.04 Price of Work 6.05 Payments 6.06 Partial Payments 6.07 Use of Completed Portions &Punchlist 6.08 Substantial Completion 6.08-1 6.09 Final Payment 6.10 Correction of Work Before Final Payment 6.11 Correction of Work After Final Payment 6.12 Payments Withheld 6.13 Delayed Payments 77.0 EXTRA WORK AND CLAIMS 27 7.01 Differing Site Conditions 7.02 Change Orders 7.03 Change Orders 7.04 Request for Work Approval for Work on Non-Work Days 7.05 Minor Changes 7.06 Extra Work 7.07 Time of Filing Claims 8.0 DEFAULT 30 8.01 Default by Contractor 8.02 Supplementation of Contractor Forces 8.03 Cumulative Remedies & Specific Performance 8.04 Cross-Default 10-2012 00700-iv CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (.16\ 8.05 Insolvency 8.06 Contingent Assignment 8.07 Waiver of Consequential Damages 8.08 Termination for Convenience 8.09 Default by Owner 9.0 DISPUTE RESOLUTION 35 ATTACHMENT NO. 1: WORKERS' COMPENSATION INSURANCE COVERAGE Al ATTACHMENT NO. 2: AGREEMENT FOR FINAL PAYMENT AND CONTRACTOR'S SWORN RELEASE B1 ATTACHMENT NO. 3: OWNER'S INSURANCE REQUIREMENTS OF CONTRACTOR Cl 7\' 10-2012 00700-v CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Section 00700 t) GENERAL CONDITIONS OF AGREEMENT 1.0 DEFINITIONS AND INTERPRETATIONS 1.01 OWNER, CONTRACTOR AND ENGINEER. The OWNER, the CONTRACTOR and the ENGINEER are those persons or organizations identified as such in the Agreement. The term ENGINEER as used in these General Conditions shall refer to the Engineer or Architect identified in the Agreement, as applicable, and means a person authorized to act as a representative of the entity designated by the OWNER to provide professional services required in connection with the preparation of plans and specifications of this Contract. The term CONSTRUCTION MANAGER as used in these General Conditions shall refer to the Construction Manager identified in the Agreement, as applicable, and means a person authorized to act as representative of the entity designated by the OWNER to provide professional services required in connection with the performance of the work of this Contract. The Owner's representative on the project site shall be the CONSTRUCTION MANAGER or ENGINEER as designated. 1.02 CONTRACT DOCUMENTS. The Contract Documents shall consist of all of the documents identified in Article 8 of the Standard Form of Agreement, which documents, excluding such documents as may be delivered or issued after the Effective Date of the Agreement, as referenced in Article 8, shall be bound together in a Project Manual for the Work. All references to the "Contract" or the "Agreement" in these General Conditions of Agreement shall include the Contract Documents. The Contract Documents are complementary, and what is required by one shall be binding as if required by all. In the event of any conflict among the Contract Documents, the Contract Documents shall govern in the following order: (1) Modifications in writing and signed by both parties, including any Change Orders; (2) Standard Form of Agreement; (3) Special Conditions of Agreement; (4) General Conditions of Agreement, including Attachment No. 1 — Workers' Compensation Insurance Coverage, Attachment No. 2 — Agreement for Final Payment and CONTRACTOR'S Sworn Release, and Attachment No. 3 —Owner's Insurance Requirements of Contractor; (5) Addenda, if any; (6) Plans and Specifications referenced or included in the Project Manual; (7) Instructions to Bidders; (8) Bid Proposal; and 10-1012 00700- 1 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (9) Exhibits: The following Exhibits,if any, attached hereto, are incorporated herein, and are a part of this Contract: In the event a conflict or inconsistency remains between or within the Contract Documents, or the Contract Documents and applicable standards, codes and ordinances, CONTRACTOR shall provide the greater quantity or better quality, or CONTRACTOR shall comply with the more stringent requirements, as determined by ENGINEER. Terms or phrases used in the Contract Documents with a well-known technical or construction industry meaning shall have such recognized meanings. References to standards, specifications, manuals or codes of any technical society, organization or association, or to the laws or regulations of any governmental authority, shall mean the latest in effect on the effective date of the Contract,unless otherwise stated in the Contract Documents. 1 .03 SUBCONTRACTOR. The term "subcontractor", as employed herein, includes those entities having a contract with the CONTRACTOR or a subcontractor for performance of work on the Project. OWNER shall have no responsibility to any subcontractor for performance of work on the Project contemplated by these Contract Documents, and any such subcontractor shall look exclusively to CONTRACTOR for any payments due subcontractor. 1.04 WRITTEN NOTICE. Written Notice shall be deemed to have been duly served if delivered in person or by electronic means through the Pro-Trak to the individual or to a partner of the partnership or joint venture, or to an officer of the corporation or company for whom it is Cow, intended, or if delivered at or sent by Certified Mail, Return Receipt Requested, to the last known business address or registered office of such individual,partnership,joint venture or corporation or company, or to the address for giving notices listed in the Standard Form of Agreement. 1.05 WORK. Unless otherwise stipulated, the CONTRACTOR shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, services, insurance, and all water, light, power, fuel, transportation and all other facilities or services of any nature whatsoever necessary for the execution and completion of the Work described in the Standard Form of Agreement. Unless otherwise specified, all materials shall be new, and both workmanship and materials shall be of good quality. The CONTRACTOR shall, if required by the ENGINEER as representative of the OWNER, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well-known, technical or trade meaning shall be held to refer to such recognized standards. All work shall be done and all materials shall be furnished in strict conformity with the Contract Documents. 1.06 EXTRA WORK. The term "Extra Work", as used in this Contract, shall be understood to mean and include all work that may be required by the ENGINEER as representative of the OWNER, to be performed by the CONTRACTOR to accomplish any change, alteration or addition to the work shown in the plans. Extra work shall be authorized in writing by the ENGINEER prior to commencement. Extra Work items are paid for on an as needed, as authorized basis only. 1.07 WORK DAY: As used herein, a "Work Day" is defined as any Monday through Friday, not a legal holiday, and any Saturday or Sunday specifically approved by the.OWNER, in (a.R6` which the CONTRACTOR can perform six or more hours of work per the current construction schedule. CONTRACTOR agrees to request specific approval from the Construction Manager or 10-1012 00700-2 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Owner, in advance, to perform work on Saturdays or Sundays and in so doing agrees to pay all �1 charges and costs for Inspection and or Construction Management services required during the performance of any such approved work. Refer to paragraph 7.05 for procedure to determine cost for Construction Management and Inspection Services for work on non-work days. 1.07-1 RAIN DAY: As used herein, is defined as any WORK DAY during which weather related conditions prevent the CONTRACTOR from performing four (4) or more consecutive hours of work on critical path items as identified in the current construction schedule. CONTRACTOR shall record Rain Days on the Pay Application each month for the review and possible approval by the OWNER. The approved Rain Day is then added to the Contract Time. (See 1.12 Contract Time below) 1.07-2 IMPACT DAY: As used herein, is a day that is added to the CONTRACT TIME by the OWNER by Change Order to extend the Contract Time by one full Work Day. (See 1.12 Contract Time below) Impact Days, once approved by the OWNER, shall extend the Contract Time on a one-to-one basis to replace a Work Day lost to conditions that prevented the CONTRACTOR from performing four (4) or more consecutive hours of work on critical path items. Impact Days are added to the Contract Time by Change Order only at the end of the work and then only if, in the opinion of the OWNER, a time extension is warranted due to delays beyond the control of the Contractor and required to complete the work within the Contract Time. 1.08 CALENDAR DAY. A "calendar day" is any day of the week, month or year no days being excepted. Unless otherwise expressly provided, all references to "day(s)" shall mean calendar day(s). 1 .09 SUBSTANTIALLY COMPLETED: The terms "Substantially Completed", or "Substantially Complete" or"Substantial Completion" as used in this Contract, shall mean that all major process components of the facility or work have been made suitable for use or occupancy, including appropriate documentation from the equipment suppliers that all of the individual components have been installed in accordance with the specifications and manufacturer's recommendations, the installations have been approved by the ENGINEER and the items have met the start-up and testing requirements of the contract documents or is deemed to be in a condition to serve its intended purpose or requires only minor miscellaneous work and adjustment to achieve Final Completion and Acceptance as determined by the ENGINEER. Upon compliance with the above referenced criteria, ENGINEER shall issue a Certificate of Substantial Completion. PARTIAL SUBSTANTIAL COMPLETION: designation will be given on components of the Work that must be placed into service prior to the completion of the entire Work. The contractor's One Year Warranty period for these items shall begin on the date of Partial Substantial Completion as designated by the ENGINEER. The ENGINEER shall determine and make all such designations. 1.10 INTERPRETATION OF WORDS AND PHRASES. Whenever the words "directed", "permitted", "designated", "required", "ordered", "considered necessary", "prescribed" or words of like import are used, it shall be understood that the direction, requirement,permission, order, opinion designation or prescription of the ENGINEER as the OWNER's representative is intended. Similarly, the words "approved", "acceptable", "satisfactory" or words of like import shall mean that no exception is taken by ENGINEER, but does not relieve CONTRACTOR of n responsibility for compliance with the Contract Documents. 10-1012 00700-3 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (11°'\ Whenever in the Specifications or Plans of the Contract Documents, the terms of description of various qualities relative to finish, workmanship or other qualities of similar kind which cannot, from their nature,be specifically and clearly described and specified,but are necessarily described in general terms, the fulfillment of which must depend on individual judgment, then, in all such cases, any question of the fulfillment of said Specifications shall be decided by the ENGINEER as the OWNER's representative, and said work shall be done in accordance with his interpretations of the meaning of the words,terms or clauses defining the character of the work. 1.11 REFERENCED STANDARDS. No provision of any referenced standard specification, or manual shall be effective to change the duties and responsibilities of the Owner, Engineer, Contractor, or their consultants, employees, or representatives from those set forth in the Contract Documents, nor shall it be effective to assign to the Engineer or its consultants, employees, or representatives any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undertake responsibilities contrary to provisions of the Contract Documents. 1.12 CONTRACT TIME The term Contract Time as used herein, refers to the number of Calendar days provided to complete the work or the date, stated in the Agreement: (i)to achieve Substantial Completion, and (ii) to complete the Work so that it is ready for final payment as evidenced by ENGINEER's written recommendation of final payment in accordance with Paragraph 6.09 and as modified as a result of any authorized Extensions. The established Contract Time includes 40 Rain Days per year, based on the average number of rain days per year for the period of June 1898 to December 1996 as recorded by the Alvin Weather Center Record. The Contract Time shall only be extended by (a) the addition of Rain Days equal to the number of actual Rain Days in excess of 40 days per year and (b) the number of Impact Days granted for delays, in the opinion of the Owner, beyond the control of the Contractor. The extension of the Contract Time shall be the CONTRACTOR's sole and exclusive remedy for delays. 1.13 CONSTRUCTION INSPECTOR The term "Construction Inspector" here in includes those professionals engaged by the OWNER to ensure CONTRACT work's compliance with the specifications and any applicable statutory requirements. 1.14 BALANCING CHANGE ORDER is a change order executed during the close-out process that may add/remove pay items, or adjust quantities of existing items or remove unused pay items or quantities Balancing Change Orders are used to reconcile the unit cost of the work performed or installed by the Contractor. 2.0 RIGHTS AND RESPQNSIBILITIES OF THE OWNER 2.01 NO WARRANTY OF DESIGN. It is understood that the OWNER MAKES NO WARRANTY OF THE ADEQUACY, ACCURACY OR SUFFICIENCY OF THE PLANS AND SPECIFICATIONS OR ANY OTHER DESIGN DOCUMENTS, AND OWNER HEREBY EXPRESSLY DISCLAIMS ANY SUCH WARRANTY, EXPRESSED OR IMPLIED. Prior to commencing each portion of the Work, CONTRACTOR shall carefully study and compare the (silk\ relevant Contract Documents, shall observe conditions at the site affecting the Work, and shall take field measurements of existing conditions related to the Work. Any errors, omissions or 10-1012 00700-4 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT inconsistencies in the Contract Documents noted by the CONTRACTOR, and/or any variance between the Contract Documents and applicable codes, standards or ordinances, shall be promptly reported by CONTRACTOR to ENGINEER in writing as a Request for Information. Work performed prior to a Request for Information shall be at the Contractor's risk. If CONTRACTOR fails to perform its obligations under this paragraph, CONTRACTOR shall pay such costs and damages to OWNER as would have been avoided if CONTRACTOR had reported any errors, omissions, inconsistencies or variances in the Contract Documents noted by CONTRACTOR or which should have been noted by a careful study of the Contract Documents. CONTRACTOR shall comply with the Contract Documents, all approved modifications thereof and additions and alterations thereto approved in writing by the OWNER. The burden of proof of such compliance shall be upon the CONTRACTOR to show that he has complied with the requirements of the Contract Documents and approved modifications thereof and all approved additions and alterations, thereto, as the same shall have been interpreted by the ENGINEER. 2.02 RIGHT OF ENTRY. The OWNER reserves the right to enter the property or location on which the work herein contracted for is to be performed, constructed or installed, for itself or such agent or agents as it may select, for the purpose of inspecting the work, or for the purpose of performing, constructing or installing such collateral work as the OWNER may desire. The OWNER shall have the right to make inspections at all reasonable times, and the CONTRACTOR hereby waives any claims for extension of time and/or compensation for any loss or damage if his work shall be delayed by reason of such inspection, performance, construction or installation of collateral work. 2.03 OWNERSHIP OF PLANS. All plans, specifications and copies thereof furnished by the OWNER shall not be reused on other work and, with the exception of the sets forming the part of the signed Contract Documents, are to be returned to the OWNER on request at the completion of the Work. All plans and models are the property of the OWNER. 2.04 CHANGES AND ALTERATIONS. The CONTRACTOR further agrees that the Owner may make such changes and alterations, additions and deletions as the OWNER may see fit, in the Work, including but not limited to changes in line, grade, form, dimensions, plans or specifications for the Work herein contemplated, or any part thereof, either before or after the beginning of construction, without affecting the validity of this Contract and the corresponding Performance and Payment Bonds. If such changes or alterations or deletions diminish the quantity or the value of the Work to be done, they shall not constitute the basis for a claim for compensation or damages, including lost or anticipated profits on the Work that may be affected. If the amount of Work is increased and the work can fairly be classified under the specifications, such increase shall be paid for according to the quantity actually done and at the unit price, if any, established for such work under this Contract, otherwise, such additional work shall be paid for as provided under Article 7 hereof for Extra Work. In case the OWNER shall make such changes or alterations as shall make useless any Work already done or material already furnished or used in said Work, then the OWNER shall compensate the CONTRACTOR for any material or labor so used and for any actual loss occasioned by such change due to actual expenses incurred in preparation for the Work as originally planned. 2.05 DAMAGES. In the event the OWNER is damaged in the course of the work by the act, negligence, omission, mistake or default of the CONTRACTOR, or should the 10-1012 00700-5 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT CONTRACTOR unreasonably delay the progress of the work being done by others on the job so as to cause loss for which the OWNER becomes liable, then the CONTRACTOR shall reimburse the OWNER for such loss. 3.0 RIGHTS AND RESPONSIBILITIES OF THE ENGINEER 3.01 OWNER-ENGINEER RELATIONSHIP. The ENGINEER shall serve as the OWNER'S representative during construction. The duties, responsibilities and limitations on the authority of the ENGINEER as the OWNER's representative during construction are set forth in the. Contract Documents; and the ENGINEER shall not have authority to extend the OWNER's liability or to bind the OWNER for any additional liability of any nature whatsoever without the written consent of the OWNER. Any communications by the OWNER to the CONTRACTOR regarding the Work shall be issued through the ENGINEER. It is the intent of this Agreement that there shall be no delay in the execution of the Work; therefore, written decisions or directions. rendered by the ENGINEER as the OWNER's representative shall be promptly carried out, and any claim arising therefrom shall be resolved as provided in Article 7. Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the OWNER'S representative shall have the authority to issue written stop work orders whenever such stoppage may be necessary to insure the performance of the Work in accordance with the Contract Documents. 3.02 KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE. The ENGINEER shall furnish the CONTRACTOR with four(4) copies of all Plans and Specifications without expense to the CONTRACTOR, and the CONTRACTOR shall keep one full size copy of the same constantly accessible on the job site, with the latest revisions noted thereon. The CONTRACTOR shall be responsible for preserving the Plans and Specifications, timely and accurately updated, for reference and review by the OWNER or the ENGINEER and submittal of redlines during closeout. 3.03 PRELIMINARY APPROVAL. The ENGINEER shall not have the power to waive the obligations imposed under this Contract for the furnishing by the CONTRACTOR of new material of good quality, and for good and workmanlike performance of the Work as herein described, and in full accordance with the Contract Documents, without alteration, deletion or change. No failure or omission of the OWNER'S representative to discover, object to or condemn any non-conforming or defective work or material, or to stop work, shall release the CONTRACTOR from the obligation to fully and properly perform the Contract, including without limitation, the obligation to at once remove and properly replace any defective work or material at any time prior to fmal acceptance, upon discovery of such non-conforming or defective work or material. Any questioned Work may be ordered taken up or removed for inspection by the ENGINEER prior to fmal acceptance, and if found not to be in accordance with the Contract Documents, all expense of removing, inspection and repair or replacement shall be borne by the CONTRACTOR; otherwise the expense thus incurred shall be allowed as Extra Work and shall be paid for by the OWNER, provided that where inspection or approval is specifically required by the Specifications prior to performance of certain work, should the CONTRACTOR proceed with such work without requesting prior inspection or approval, he shall bear all expense of taking up, removing and replacing this work if so directed by the ENGINEER. 10-1012 00700-6 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 3.04 INSPECTION BY ENGINEER. The ENGINEER will make periodic visits to the site to observe the progress and quality of the executed Work and to determine if such Work generally meets the essential performance and design features and the technical, functional /or engineering requirements of the Contract Documents, and is in all other respects being performed in compliance with the Contract Documents. However, the ENGINEER shall not be responsible for making any detailed, exhaustive, comprehensive or continuous on-site inspections to check the quality and/or quantity of the work, nor shall the ENGINEER be in any way responsible, directly or indirectly, for the construction means, methods, techniques, sequences, quality, procedures, programs, safety precautions or lack of same incident to the Work being performed or any part thereof. The ENGINEER shall use reasonable care to prevent deviation from the intent and substance of the Contract Documents by the CONTRACTOR in the performance of the Work and any part thereof and, on the basis of such on-site observations, will keep the OWNER informed of the progress of the work and will endeavor to guard the OWNER against defects and deficiencies in the Work of the CONTRACTOR. Notwithstanding any other provision of this Agreement or any other Contract Document, the ENGINEER shall not be in any way responsible or liable for any acts, errors, omissions or negligence of the CONTRACTOR, any subcontractors, agents, servants or employees or any other person, firm or corporation performing or attempting to perform any of the Work. 3.05 DETERMINATION OF QUESTIONS AND DISPUTES. In order to prevent delays and disputes and to discourage litigation, it is agreed that the ENGINEER shall, in all cases, determine the quantities and qualities of the several kinds of Work, which are to be paid for under this Contract. The ENGINEER shall address all questions in relation to said Work and the J construction thereof, as well as all claims, disputes and other matters in question between the CONTRACTOR and the OWNER relating to the execution or progress of the Work or the interpretation of the Contract Documents. In the event the ENGINEER shall become aware of or shall receive information that there is a dispute or a possible dispute as to the reasonable interpretation of the terms and conditions of the Contract Documents, or any other dispute or question, the ENGINEER shall, within a reasonable time, provide a written interpretation of the Contract Documents or a written decision on all questions arising relative to the execution of the Work, copies of which shall be delivered to all parties to the Contract. If the CONTRACTOR or OWNER desires to take exception to any directions, order, interpretation or instructions of the ENGINEER, CONTRACTOR or OWNER shall present any such claim to the ENGINEER in accordance with the provisions of Section 7.04. 3.06 RECOMMENDATION OF PAYMENT. The ENGINEER shall review the CONTRACTOR's application for payment and supporting documents, shall determine the amount owed to the CONTRACTOR and shall provide written recommendation to the OWNER for payment to the CONTRACTOR in such amount. Such recommendation of payment to CONTRACTOR shall constitute a representation to the OWNER of the ENGINEER's judgment that the work has progressed to the point indicated, to the best of his knowledge, information and belief; however, such recommendation of an application for payment to CONTRACTOR shall not be deemed an acceptance of any defective or non-conforming Work. Any recommendation of payment by the ENGINEER shall be subject to OWNER's rights to withhold payment under Section 6.11 and as otherwise provided in the Contract. 10-1012 00700-7 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (121*\ 4.0 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR 4.01 INDEPENDENT CONTRACTOR. CONTRACTOR is, and shall remain, an independent contractor, solely responsible for the manner and method of completing the Work under this Contract, with full and exclusive power and authority to direct, supervise and control his own employees and to determine the means, method and manner of performing such Work, so long as such methods comply with the requirements of the Contract Documents, and do not adversely affect the completed improvements or any other property abutting or adjoining the Work area, the OWNER and ENGINEER being interested only in the result obtained and conformity of such completed improvements to the Plans, Specifications and Contract Documents. The fact that the OWNER or ENGINEER as the Owner's representative shall have the right to observe CONTRACTOR's work during his performance and to carry out the other prerogatives which are expressly reserved to and vested in the OWNER and the ENGINEER hereunder, is not intended to and shall not at any time change or affect the status of the CONTRACTOR as an independent contractor with respect to either the OWNER,or the ENGINEER as the OWNER's representative or to the CONTRACTOR's own employees or to any other person, firm or corporation. 4.02 CONTRACTOR'S UNDERSTANDING. It is understood and agreed that the CONTRACTOR has, by careful examination, satisfied himself as to the nature and location of the Work, the conformation of the ground, the character, quality and quantity of the materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the Work, the general and local conditions, including but not limited to weather, access, lay down and storage areas, and all other matters which in any way affect the Work under (116'\, this Contract. It is further understood that the CONTRACTOR has satisfied himself as to the terms, meaning, intent and requirements of all of the Contract Documents, and applicable laws, codes, regulations and ordinances. CONTRACTOR hereby warrants and represents that it has taken into consideration all of the foregoing factors, and CONTRACTOR shall perform the Work for the Contract Price and within the Contract Time. No verbal agreement or conversation with any officer, agent or employee of the OWNER or the ENGINEER, either before or after the execution of this Contract, shall affect or modify any of the terms or obligations herein contained. 4.03 LAWS AND ORDINANCES. The CONTRACTOR shall at all times observe and comply with all federal, state or local laws, codes, ordinances, permits and regulations, regardless of whether the same are adopted before or after the execution of this Contract, which in any manner affect the Contract or the work, and shall indemnify, save and hold harmless the OWNER and the ENGINEER against any claim arising out of the violation of any such laws, ordinances and regulations, whether by the CONTRACTOR or his agents, employees, subcontractors or vendors. If the CONTRACTOR observes that the Plans and Specifications are at variance with federal or state laws or codes or the ordinances or regulations of the City,he shall promptly notify the ENGINEER in writing, and any necessary changes shall be made as provided in the Contract for changes in the work. If the CONTRACTOR performs any work knowing it to be contrary to such laws, codes, ordinances, rules or regulations, or if CONTRACTOR reasonably should have known of any such violation, and without such notice to the ENGINEER, CONTRACTOR shall bear all costs arising therefrom. The OWNER is a Political Subdivision of the State of Texas, and the law from which it derives its powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions under which the OWNER may enter into contracts, shall be controlling and shall be considered as part of this Contract to the same effect as though embodied herein. Neither the act 10-1012 00700-8 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT of OWNER entering into this Contract, nor OWNER's performance hereunder, shall constitute a waiver of any immunity from suit enjoyed by OWNER under applicable law, all such rights and defenses being hereby expressly reserved, notwithstanding any term or provision herein to the contrary. The Code of Ordinances and other applicable regulations of the OWNER shall be deemed to be embodied in this Contract. The prevailing wage rates applicable to this Project shall be either Document 00811 —Wage Scale for Engineering Construction, or Document 00813 —Wage Scale for Building Construction, or both, as set out in the Project Manual. 4.04 ASSIGNMENT AND SUBLETTING. The CONTRACTOR further agrees that he will retain personal control and will give his personal attention to the fulfillment of this Contract and that he will not assign, by power of attorney or otherwise, or sublet said Contract, or any rights, duties or obligations arising thereunder, in whole or in part, without the prior written consent of the OWNER, and that no part or feature of the Work will be sublet to anyone objectionable to the ENGINEER or the OWNER. In addition, the OWNER reserves the right to disapprove the subletting of this Contract or any portion hereof on any basis whatsoever. The CONTRACTOR further agrees that the subletting of any portion or feature of the Work or materials required in the performance of this Contract shall not relieve the CONTRACTOR from his obligations to the OWNER, as provided for by this Agreement. 4.05 PERFORMANCE, PAYMENT AND MAINTENANCE BONDS. In the event the Contract Price shall be in excess of $25,000.00, the CONTRACTOR shall execute separate Performance,Payment and Maintenance Bonds, each in the sum of one hundred percent(100%)of the Contract Price, and each in accordance with the provisions of Chapter 2253 of the Texas Government Code. If the Contract Price does not exceed $25,000.00, the statutory bonds will not be required. All required Bonds shall be payable to OWNER and on forms approved by the OWNER, and shall be executed by a corporate surety in accordance with Article 7.19-1 of the Texas Insurance Code. It is agreed that the Contract shall not be in effect until such original Performance, Payment and Maintenance Bonds are delivered to and approved by the OWNER. The cost of the premium for the Performance, Payment and Maintenance Bonds, should Maintenance Bonds be required, shall be included in the CONTRACTOR's Bid Proposal. All bonds shall be issued by Texas Department of Insurance approved surety companies. 4.06 INSURANCE. The CONTRACTOR, at his own expense, shall procure, maintain and keep in force throughout the duration of the Work, and throughout the Guarantee Period, insurance as specified in Attachment No. 1 hereto with regard to Workers' Compensation Insurance, and as specified in Attachment No. 3 hereto with regard to all other Insurance. Such insurance shall be carried with an insurance company licensed to transact business in the State of Texas and shall cover all operations in connection with this Contract, whether performed by the CONTRACTOR or a subcontractor, or others for whom CONTRACTOR is responsible. 4.07 PERMITS AND FEES. Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for all permits, licenses, and inspections necessary for proper execution and completion of the Work, and which are legally required at the time bids are received. Permits required by the City of Pearland will be issued as a NO FEE permit. 4.08 TEXAS STATE SALES TAX. Materials incorporated into this project are exempt from State Sales according to provisions of the Texas Tax Code, Chapter 151, Subsection H. 10-1012 00700-9 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT The Contractor must obtain a limited sales, excise and use tax exemption or permit certificate which shall enable him to buy the materials to be incorporated into the Work without paying tax at due time of purchase. 4.09 CONTRACTOR'S DUTY AND SUPERINTENDENCE. The CONTRACTOR shall give adequate attention to the faithful prosecution and completion of this Contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to the ENGINEER as the OWNER'S representative. The superintendent shall represent the CONTRACTOR in his absence and shall act as the agent of the CONTRACTOR, and all directions given to him shall be binding as if given to the CONTRACTOR. Adequate supervision by competent and reasonable representatives of the CONTRACTOR is essential to the proper performance of the Work, and lack of such supervision shall be an act of default, and grounds for suspending operations of the.CONTRACTOR. The Superintendent cannot be removed from the project without the consent of the Owner; the Superintendent must speak and understand the English language; the Superintendent must be on site when any work on the project is being done, even when a subcontractor is performing the work. The Work, from its commencement to completion, shall be under the exclusive charge and control of the CONTRACTOR, and all risk in connection therewith shall be borne by the CONTRACTOR. Neither the OWNER nor the ENGINEER as the OWNER's representative will be responsible for (11.1'\ the acts or omissions of the CONTRACTOR, its subcontractors or any of its agents or employees, or any other persons performing any of the Work. 4.10 CHARACTER OF WORKERS. The CONTRACTOR agrees to employ only orderly and competent workers, skillful in the performance of the type of work required under this Contract, to do the Work, and agrees that whenever the ENGINEER shall inform him in writing that any worker or workers on the Work are, in his opinion, incompetent, unfaithful or disorderly, or in the ENGINEER's opinion, are not using their best efforts for the progress of the Work, such worker or workers shall be discharged from the Work and shall not again be employed on the Work without the ENGINEER's written consent. OWNER reserves the right to bar any person, subcontractor, or supplier found to be incompetent, unfaithful, disorderly, or not using their best efforts to progress work or considered to be a threat to the health, safety and welfare to the project or workforce. 4.11 LABOR, EQUIPMENT, MATERIALS, CONSTRUCTION PLANT, AND BUILDINGS. The CONTRACTOR shall provide all labor, services, tools, equipment, machinery, supplies, facilities, utilities and materials necessary in the prosecution and completion of this Contract where it is not otherwise specifically provided that the OWNER shall furnish same; and further, the CONTRACTOR shall be responsible for the care, preservation, conservation and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, all means of construction and any and all parts of the Work, whether the CONTRACTOR has been paid, partially paid or not paid for such Work, until the entire Work is completed and accepted. The building or placement of structures for housing workers or offices, or the erection of tents or \\ other forms of protection,will be permitted only with the ENGINEER's written permission, and at 10-1012 00700- 10 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT such places as the ENGINEER shall direct, and the sanitary conditions of the grounds in or about such structures shall at all times be maintained in a manner satisfactory to the ENGINEER. Any structures of any nature constructed, placed or erected by the CONTRACTOR for the purposes herein set out, shall be the sole responsibility of the CONTRACTOR as to the proper erection, placement or construction thereof; and the CONTRACTOR agrees to indemnify and hold the ENGINEER or OWNER harmless from any claims of any nature whatsoever brought against either of them for damages allegedly sustained by anyone by reason of the erection, placement, construction or maintenance of CONTRACTOR's buildings or structures. 4.12 SANITATION.Necessary sanitary conveniences for the use of laborers and others on the Work site, properly secluded from public observation, shall be constructed and maintained by the CONTRACTOR in such manner and at such points as shall be approved by the ENGINEER, and their use shall be strictly enforced. Any structures of any nature constructed or erected by the CONTRACTOR for the purposes herein set out, shall be the sole responsibility of the CONTRACTOR as to the proper erection or construction thereof, and the CONTRACTOR agrees to indemnify and hold the ENGINEER and OWNER harmless from any claims of any nature whatsoever brought against either of them for damages allegedly sustained by anyone by reason of the erection, construction or maintenance of CONTRACTOR's buildings. 4.13 CLEANING AND MAINTENANCE. The CONTRACTOR shall at all times keep and maintain the premises free from accumulation of debris, trash and waste. The CONTRACTOR shall remove waste, debris and trash at the end of each work day. CONTRACTOR shall remove all such debris, trash and waste, tools, scaffolding and surplus materials, and shall leave the Work broom-clean or its equivalent, upon completion of the Work. The Work shall be left in good order and condition. In case of dispute, the OWNER may remove the debris,trash,waste and surplus materials, and charge the cost to the CONTRACTOR. 4.14 PERFORMANCE OF WORK. It is further agreed that it is the intent of this Contract that all Work must be done and all material must be furnished in accordance with the generally accepted practice for such materials furnished or work completed, unless otherwise provided in the Contract Documents. 4.15 RIGHT OF OWNER TO ACCELERATE THE WORK. If at any time the methods or equipment used by the CONTRACTOR, or the work force supplied are found to be inadequate to achieve the progress required to Substantially Complete the Work within the Contract Time, the OWNER or the ENGINEER as the OWNER's representative, may order the CONTRACTOR in writing to supplement its forces and/or equipment, or work shifts or overtime, or otherwise improve its efficiency and rate of progress to achieve Substantial Completion of the Work within the Contract Time, and the CONTRACTOR shall comply with such order, at its own cost and expense. 4.16 LAYOUT OF WORK. Except as specifically provided herein, the CONTRACTOR shall be responsible for laying out work by means of construction surveying and shall accomplish this work in a manner acceptable to the ENGINEER and in conformance with the Contract Documents. 4.17 SHOP DRAWINGS. The CONTRACTOR shall submit to the ENGINEER, with such promptness as to cause no delay in his own Work or in that of any other contractor, six (6) checked copies, unless otherwise specified, of all shop and/or setting drawings and schedules 10-1012 00700- 11 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT required for the work of the various trades. Contractor will check and approve shop drawings for compliance with requirements of Contract Documents and will so certify by stamp on each drawing prior to submittal to ENGINEER. Any drawings submitted without Contractor's stamp of approval will not be considered and will be returned to him for proper submission. The ENGINEER shall pass upon them with reasonable promptness,indicating desired corrections. The CONTRACTOR shall make any corrections required by the ENGINEER, file with him two (2) corrected copies and furnish such other copies as may be needed. The ENGINEER's approval of such drawings or schedules shall not relieve the CONTRACTOR from responsibility for deviations from the Contract Documents, unless he has, in writing, called the ENGINEER's attention to such deviations at the time of the submission, and the ENGINEER has acknowledged and accepted such deviations in writing, nor shall it relieve him from responsibility for errors of any sort in shop drawings or schedules. It shall be the CONTRACTOR's responsibility to fully and completely review all shop drawings to ascertain their effect on his ability to perform the required Contract Work in accordance with the Contract Documents, and within the Contract Time. Such review by the ENGINEER shall be for the sole purpose of determining the apparent sufficiency of said drawings or schedules to result in finished improvements in conformity with the Contract Documents, and shall not relieve the CONTRACTOR of his duty as an independent contractor as previously set forth, it being expressly understood and agreed that the ENGINEER does not assume any duty to pass upon the propriety or adequacy of such drawings or schedules, or any means or methods reflected thereby, in relation to the safety of either person or property during CONTRACTOR's performance hereunder, and any action taken by the ENGINEER shall not relieve the CONTRACTOR of his responsibility and liability to comply with the Contract Documents. OWNER, CONSTRUCTION MANAGER, ENGINEER, and CONTRACTOR shall make all submittals, review comments, notes, corrections, schedules and updates, testing results, payment applications, instructions and other communications by means of the OWNER'S Pro-Trak. The OWNER,ENGINEER and CONTRACTOR shall each retain such hard copies form this system as are required for their specific record keeping requirements. No documents shall be removed from this system or destroyed except those being replaced by the systems protocols as a latest version document. All requirements for written communications, submittals, comments, instructions or other documents processed by means of this system shall have the same legal or time sensitive status as if they had been hand delivered in hard copy to their intended addressee. 4.18 ENGINEER-CONTRACTOR RELATIONSHIP; OBSERVATIONS. It is agreed by the CONTRACTOR that the ENGINEER, as the OWNER's representative, shall be and is hereby authorized to appoint such subordinate engineers, representatives or observers as the said ENGINEER may from time to time deem proper to observe the materials furnished and the Work done under this Agreement. The CONTRACTOR shall furnish all reasonable aid and assistance required by the subordinate engineers, representatives or observers for the proper observation and examination of the work. The CONTRACTOR shall regard and obey the directions and instructions of any subordinate engineers, representatives or observers so appointed, when such ,41.16\, directions and instructions are consistent with the obligations of this Agreement and the Contract Documents, provided, however, should the CONTRACTOR object to any orders by any 10-1012 00700- 12 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT subordinate engineer, representative or observer, the CONTRACTOR may, within three (3) days, make written appeal to the ENGINEER for his decision. 4.19 OBSERVATION AND TESTING. The OWNER or the ENGINEER as the OWNER's representative shall have the right at all reasonable times to observe, inspect and test the Work. The CONTRACTOR shall make all necessary arrangements and provide proper facilities and access for such observation, inspection and testing at any location wherever Work is in preparation or progress. The CONTRACTOR shall ascertain the scope of any observation, inspection or testing which may be contemplated by the OWNER or the ENGINEER and shall give ample notice as to the time each part of the Work will be ready for such observation, inspection or testing. The OWNER or the ENGINEER may reject any Work found to be defective or not in accordance with the Contract Documents,regardless of the stage of its completion or the time or place of discovery of such deficiencies, and regardless of whether the ENGINEER has previously accepted the Work through oversight or otherwise. If any Work is covered without approval or consent of the OWNER, it must, if requested by the OWNER or the ENGINEER, be uncovered for examination, at the sole expense of the CONTRACTOR. In the event that any part of the Work is being fabricated or manufactured at a location where it is not convenient for the OWNER or the ENGINEER to make observations of such Work or require testing of said Work, then in such event, the OWNER or the ENGINEER may require the CONTRACTOR to furnish the OWNER or the ENGINEER with certificates of inspection, testing or approval made by independent persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the Contract Documents. rw4) If any Work, which is required to be inspected, tested or approved, is covered up without written approval or consent of the OWNER or the ENGINEER, it must, if requested by the OWNER or the ENGINEER, be uncovered for observation and testing, at the sole expense of the CONTRACTOR. The cost of all such inspections, tests and approvals shall be borne by the CONTRACTOR unless otherwise provided herein. Any Work which fails to meet the requirements of such tests, inspections or approval, and any Work which meets the requirements of any such tests or approval but does not meet the requirements of the Contract Documents shall be considered defective. Such defective Work and any other work affected thereby shall be corrected at the CONTRACTOR'S expense. Neither observations by the OWNER or by the ENGINEER, nor inspections, certifications, tests or approvals made by the OWNER, the ENGINEER or other persons authorized under this Agreement to make such inspections, tests or approvals, shall relieve the CONTRACTOR from his obligation to perform the Work in accordance with the requirements of the Contract Documents. 4.20 DEFECTS AND THEIR REMEDIES. It is further agreed that if the Work or any part thereof or any material brought on the site of the Work for use in the Work or selected for the same, shall be deemed by the ENGINEER as unsuitable or not in conformity with the Contract Documents, the CONTRACTOR shall, after receipt of written notice thereof from the ENGINEER, forthwith remove such material and rebuild or otherwise remedy such Work so that it shall be in full accordance with this Contract, It is further agreed that any such remedial action contemplated herein shall be at CONTRACTOR's expense. 10-1012 00700- 13 of 36 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT 4.21 LIABILITY FOR PROPER PERFORMANCE. Engineering construction drawings and specifications, as well as any additional instructions and information concerning the Work to be performed, passing from or through the ENGINEER, shall not be interpreted as requiring or allowing the CONTRACTOR to deviate from the Contract Documents, the intent of such drawings, specifications and any other such instructions being to define with particularity the agreement of the parties as to Work the CONTRACTOR is to perform. CONTRACTOR shall be fully and completely liable and contractually bound, at his own expense, for design, construction, installation and use or non-use of all items and methods incident to the performance of the Contract, including, without limitation, the adequacy of all temporary supports, shoring, bracing, scaffolding, machinery or equipment, safety precautions or devices, similar items or devices used by him during construction, and work performed either directly or incident to construction, and for all loss, damage or injury incident thereto, either to person or property, whether such damage be suffered by the ENGINEER,the OWNER or any other person not a party to this Contract. Any review of Work in progress or any visit or observation during construction, or any clarification of Contract Documents by the ENGINEER or OWNER, or any agent, employee or representative of either of them, whether through personal observation on the Project site or by means of approval of shop drawings for construction or construction processes, or by other means or methods, is agreed by the CONTRACTOR to be for the purpose of observing the extent and nature of Work completed or being performed, as measured against the Contract Documents, or for the purpose of enabling the CONTRACTOR to more fully understand the Contract Documents so that the completed construction Work will conform thereto, and shall in no way relieve the CONTRACTOR from full and complete responsibility for proper performance of his Work on the Project, including, without limitation, the propriety of means and methods of the CONTRACTOR in performing said Contract, and the adequacy of any designs, plans or other facilities for accomplishing such performance. Any action by the ENGINEER or the OWNER in visiting or observing during construction, or any clarification of Contract Documents shall not constitute a waiver of CONTRACTOR'S liability for damages as herein set out. Deviation by the CONTRACTOR from Contract Documents, whether called to the CONTRACTOR's attention or not, shall in no way relieve CONTRACTOR from his responsibility to complete all work in accordance with said Contract Documents, and further shall not relieve CONTRACTOR of his liability for loss, damage or injury as herein set out. 4.22 PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC. The CONTRACTOR shall be solely responsible for the safety of himself, his employees and persons entering the project site, as well as for the protection of the improvements being erected and the property of himself or any other person, as a result of his operations hereunder. The CONTRACTOR shall take out and procure a policy or policies of Workers' Compensation Insurance with an insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workers' Compensation laws of the State of Texas. The CONTRACTOR shall at all times exercise reasonable precautions for the safety of employees and others on or near the Work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded, as a minimum, in accordance with the "Manual of Accident Prevention in Construction" of the Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The CONTRACTOR shall provide all necessary machinery guards, safe walkways, ladders, bridges, gangplanks, barricades, fences,traffic control,warning signs and other safety devices. 10-1012 00700- 14 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT No alcoholic beverages, non-prescription drugs, or unsafe practices shall be allowed on the Work site. CONTRACTOR shall dismiss anyone participating in any of the above from the Work site for the duration of the Project. Only prescription drug uses with a doctor's authorization to perform construction activities shall be allowed on the Work site. Violation of this provision is a default under the Contract. The use, possession, sale, transfer, purchase or being under the influence of alcohol, drugs or any other illegal or unlawful substance by CONTRACTOR or CONTRACTOR's employees, or CONTRACTOR's subcontractors and employees at any time at the Work site or while on company business is prohibited. CONTRACTOR shall institute and enforce appropriate drug testing guidelines and program. All accidents or injuries to CONTRACTOR's employees working on the job site must be reported verbally and in writing to the ENGINEER immediately, and within no more than eight(8)hours. The safety precautions actually taken and their adequacy shall be the sole responsibility of the CONTRACTOR, in his sole discretion as an independent contractor. Inclusion of this paragraph in the Agreement, as well as any notice which may be given by the OWNER or the ENGINEER as the OWNER's representative concerning omissions under thus paragraph as the Work progresses, are intended as reminders to the CONTRACTOR of his duty and shall not be construed as any assumption of duty by ENGINEER, or OWNER's representative to supervise safety precautions by either the CONTRACTOR or any of his subcontractors. 4.23 PROTECTION OF ADJOINING PROPERTY. The CONTRACTOR shall employ proper means to protect the adjacent or adjoining property or properties in any way encountered, which might be injured or seriously affected by any process of construction to be undertaken under this Agreement, from any damage or injury by reason of said process of construction; and he shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent or adjoining property. THE CONTRACTOR AGREES TO INDEMNIFY, DEFEND, SAVE AND HOLD HARMLESS THE CONSTRUCTION MANAGER, OWNER AND ENGINEER AGAINST ANY CLAIM OR CLAIMS FOR DAMAGES, LOSS, COSTS OR EXPENSES, INCLUDING BUT NOT LIMITED TO ATTORNEY'S FEES, DUE TO ANY INJURY TO ANY ADJACENT OR ADJOINING PROPERTY, ARISING OR GROWING OUT OF THE PERFORMANCE OF THE CONTRACT, REGARDLESS OF WHETHER OR NOT SUCH DAMAGE, LOSS, COST OR EXPENSE IS CAUSED IN PART BY THE NEGLIGENCE, GROSS NEGLIGENCE OR STRICT LIABILITY OF OWNER AND/OR ENGINEER. 4.24 PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS, MATERIALMEN AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES. THE CONTRACTOR AGREES THAT HE WILL PROMPTLY PAY WHEN DUE, AND WILL INDEMNIFY, SAVE AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ALL CLAIMS GROWING OUT OF THE DEMANDS OF SUBCONTRACTORS, LABORERS, WORKERS, MECHANICS, MATERIALMEN AND FURNISHERS OF MACHINERY AND PARTS THEREOF, EQUIPMENT, POWER TOOLS AND ALL SUPPLIES, INCLUDING COMMISSARY, INCURRED IN THE FURTHERANCE OF THE PERFORMANCE OF THIS CONTRACT. When so desired by the OWNER, the CONTRACTOR shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. If the CONTRACTOR fails to do so, then the OWNER may, at the option of the OWNER, either pay directly any unpaid bills of which the OWNER has written notice, or withhold from the CONTRACTOR's unpaid compensation a sum of money deemed reasonably 10-1012 00700- 15 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT sufficient to liquidate any and all such claims until satisfactory evidence is furnished that all liabilities have been fully discharged, whereupon payments to the CONTRACTOR shall be resumed in full, in accordance with the terms of this Contract. Any and all communications between any parties under this paragraph shall be in writing. Nothing contained in this paragraph or this Agreement shall create, establish or impose any relationship, contractual or otherwise,between OWNER and any subcontractor,laborer or supplier of CONTRACTOR, nor shall it create, establish or impose any duty upon OWNER to pay or to see to the payment of any subcontractor, laborer or supplier of CONTRACTOR. 4.25 PROTECTION AGAINST ROYALTIES OR PATENTED INVENTION. The CONTRACTOR shall pay all royalties and license fees and shall provide for the use of any design, device, material or process covered by letters patent or copyright, by suitable legal agreement with the patentee or owner thereof THE CONTRACTOR SHALL DEFEND ALL SUITS OR CLAIMS FOR INFRINGEMENT OF ANY PATENT OR COPYRIGHT AND SHALL INDEMNIFY, SAVE AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY LOSS OR LIABILITY ON ACCOUNT THEREOF, EXCEPT SUCH SUITS AND CLAIMS ARISING OUT OF A PARTICULAR DESIGN, DEVICE, MATERIAL OR PROCESS OR THE PRODUCT OF A PARTICULAR MANUFACTURER OR MANUFACTURERS SPECIFIED OR REQUIRED BY THE OWNER; PROVIDED, HOWEVER, IF CHOICE OF ALTERNATE DESIGN, DEVICE, MATERIAL OR PROCESS IS ALLOWED TO THE CONTRACTOR, OR IF CONTRACTOR KNEW OR SHOULD HAVE KNOWN OF THE Clib\ PATENT OR COPYRIGHT AND FAILED TO PROMPTLY NOTIFY OWNER IN WRITING, THEN THE CONTRACTOR SHALL INDEMNIFY, DEFEND, SAVE AND HOLD THE OWNER HARMLESS FROM ANY LOSS OR LIABILITY ON ACCOUNT THEREOF. 4.26 INDEMNIFICATION. THE CONTRACTOR AGREES TO DEFEND, INDEMNIFY AND HOLD THE ENGINEER AND THE OWNER HARMLESS FROM ANY CLAIMS OR DEMANDS OF ANY NATURE WHATSOEVER MADE BY ANY EMPLOYEE, EMPLOYEES, AGENTS OR SUBCONTRACTORS OF CONTRACTOR, OR BY ANY UNION, TRADE ASSOCIATION, WORKER'S ASSOCIATION OR OTHER GROUPS, ASSOCIATIONS OR INDIVIDUALS, ALLEGEDLY REPRESENTING EMPLOYEES OF THE CONTRACTOR, IN ANY DISPUTE BETWEEN THE CONTRACTOR AND HIS EMPLOYEES, DIRECTLY OR INDIRECTLY INVOLVING, GROWING OUT OF OR ARISING FROM CLAIMS BY SUCH EMPLOYEES FOR WAGES, SALARY, COMPENSATION, BENEFITS, WORKING CONDITIONS OR ANY OTHER SIMILAR COMPLAINT OR CLAIM WHICH MAY BE MADE. THE CONTRACTOR, HIS SURETIES AND INSURANCE CARRIERS SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS THE OWNER AND THE ENGINEER AND THEIR RESPECTIVE OFFICERS, REPRESENTATIVES, AGENTS AND EMPLOYEES FROM AND AGAINST ALL DAMAGES, CLAIMS, LOSSES, DEMANDS, SUITS, LIABILITIES, JUDGMENTS AND COSTS OF ANY CHARACTER WHATSOEVER, INCLUDING REASONABLE ATTORNEY'S FEES AND EXPENSES, AND SHALL BE REQUIRED TO PAY ANY JUDGMENT THEREFOR, WITH COSTS, WHICH MAY BE OBTAINED AGAINST THE OWNER AND/OR THE ENGINEER OR ANY OF THEIR OFFICERS, rib\ REPRESENTATIVES, AGENTS OR EMPLOYEES, ARISING OUT OF OR RESULTING FROM OR ALLEGEDLY ARISING OUT OF OR RESULTING FROM THE PERFORMANCE 10-1012 00700- 16 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT OF THE WORK, PROVIDED THAT ANY SUCH DAMAGES, CLAIM, LOSS, DEMAND, SUIT,LIABILITY, JUDGMENT, COST OR EXPENSE: (A) ARISES OUT OF OR RESULTS FROM IN WHOLE OR IN PART, OR ALLEGEDLY ARISES OUT OF OR RESULTS FROM IN WHOLE OR IN PART, ANY BREACH OF THIS AGREEMENT OR BREACH OF WARRANTY BY CONTRACTOR; OR (B) IS ATTRIBUTABLE TO BODILY INJURY, SICKNESS, DISEASE OR DEATH OR INJURY TO OR DESTRUCTION OF TANGIBLE PROPERTY, INCLUDING THE LOSS OF USE RESULTING THEREFROM; AND IS CAUSED IN WHOLE OR IN PART OR IS ALLEGEDLY CAUSED IN WHOLE OR IN PART BY ANY NEGLIGENT ACT OR OMISSION OF THE CONTRACTOR, ANY SUBCONTRACTOR, THEIR AGENTS OR EMPLOYEES OR ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY ANY ONE OF THEM OR ANYONE FOR WHOSE ACTS ANY OF THEM MAY BE LIABLE, REGARDLESS OF WHETHER OR NOT IT IS CAUSED IN PART OR ALLEGEDLY CAUSED IN PART BY THE NEGLIGENCE, GROSS NEGLIGENCE OR STRICT LIABILITY OF OWNER, ENGINEER AND/OR A PARTY INDEMNIFIED HEREUNDER. '"� Notwithstanding the foregoing or anything in the Agreement to the contrary, in accordance with J the provisions of Section 130.002 of the Texas Civil Practice and Remedies Code, CONTRACTOR shall not be obligated to indemnify or hold harmless the ENGINEER,his agents, servants or employees, from liability for damage that is caused by or results from defects in plans, designs or specifications prepared, approved or used by the ENGINEER, or negligence of the ENGINEER in the rendition or conduct of professional duties called for or arising out of any construction contract and the plans, designs or specifications that are a part of the construction contract, and arises from personal injury or death, property injury, or any other expense that arises from personal injury, death, or property injury. This indemnity agreement is a continuing obligation, and shall survive notwithstanding completion of the Work, Final Payment, expiration of the warranty period, termination of the Contract, and abandonment or takeover of the Work. CONTRACTOR's indemnification obligations hereunder shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the CONTRACTOR or a subcontractor under workers' compensation acts, disability benefit acts or other employee benefit acts, and shall not be limited by any limitation on amounts or coverage of insurance provided or to be provided under this Contract. 4.27 LOSSES FROM NATURAL CAUSES. All loss, cost, expense or damage to the CONTRACTOR arising out of the nature of the Work to be done or from any unforeseen circumstances in the prosecution of the same, or from the action of the elements, or from unusual obstructions or difficulties which may be encountered in the prosecution of the Work, shall be sustained and borne by the CONTRACTOR at his own cost and expense. 10-1012 00700- 17 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Cisb"\, 4.28 GUARANTEE. The CONTRACTOR hereby guarantees all the Work under the Contract to be free from defects or deficiencies in material in every particular and free from defects or deficiencies in workmanship; and against unusual damage from proper and usual use; and agrees to replace or to re-execute without cost to the OWNER such Work as may be found to be defective, deficient or otherwise not in conformance with the Contract Documents, and to make good all damages caused to other work or material, due to such defective Work or due to its required replacement or re-execution. This guarantee shall cover a period of one year from the date of Substantial Completion or Partial Substantial Completion of Work under the Contract, as evidenced by the Certificate of Substantial Completion.. Neither the Certificate of Substantial Completion, Final Payment, nor any provision in the Contract Documents shall relieve the CONTRACTOR of the responsibility for defective, deficient or non-conforming material or workmanship during the period covered by the guarantee. The one-year period of guarantee will not limit the OWNER'S other rights under common law with respect to any defects, deficiencies or non-conforming Work discovered after one year. If this one-year guarantee conflicts with other warranties or guarantees, the longer period of warranty or guarantee will govern. 5.0 PROSECUTION AND PROGRESS 5.01 TIME AND ORDER OF COMPLETION. It is the meaning and intent of this Contract, unless otherwise herein specifically provided, that the CONTRACTOR shall be allowed to prosecute his Work at such times and seasons, in such order of precedence, and in such manner as shall be most conducive to economy of construction; provided, however, that the order and the time of prosecution shall be such that the Work shall be Substantially Completed as a whole and in part, in accordance with this Contract and the Contract Time; provided, also, that when the OWNER is having other work done, either by contract or by his own forces, the ENGINEER may direct the time and manner of constructing the Work done under this Contract, so that conflict will be avoided and the construction of the various works being done for the OWNER shall be harmonized, and the CONTRACTOR shall fully cooperate and coordinate its Work with OWNER or such other contractors. The CONTRACTOR shall submit, an updated schedule with every pay estimate for review by the ENGINEER, schedules which shall show the order in which the CONTRACTOR proposes to carry on the Work, with dates on which the CONTRACTOR will start the several parts of the work, and estimated dates of completion of the several parts. Such schedules shall show completion of the Work within the Contract Time; and/or shall show such recovery efforts as CONTRACTOR intends to undertake in the event Substantial Completion of the Work is delayed. 5.02 EXTENSION OF TIME. The CONTRACTOR agrees that he has submitted his Bid Proposal in full recognition of the time required for the completion of this Project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions as hereinafter set forth, and that he shall not be entitled to, nor will he request, an extension of time on this Contract, except when Substantial Completion of the Work has been delayed solely by strikes, lockouts, fires,Acts of God, or by any other cause which the ENGINEER shall decide justifies the delay. The CONTRACTOR shall give the ENGINEER prompt notice, in writing and within three (3) days of the start of any such delay, of the cause of any such delay, and its estimated effect on the Work and the schedule for (1.16\ completion of the Work. Upon receipt of a written request for an extension of the Contract Time from the • CONTRACTOR, supported by relevant and all requested documentation, the 10-1012 00700- 18 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ENGINEER shall submit such written request, together with his written recommendation, to the OWNER for consideration. If the delay is not attributable in whole or in part to any act or omission of CONTRACTOR, its subcontractors or suppliers, and if the OWNER determines that CONTRACTOR is entitled to an extension of time under the terms of the Contract, the OWNER shall grant an extension of time for Substantial Completion of the Work, sufficient to compensate for the delay, and such extension of time shall be CONTRACTOR's sole and exclusive remedy, except as may be otherwise provided herein. No extensions of Contract Time shall be made for delays occurring prior to the Contractor's mobilization as defined in Section 01505 MOBILIZATION. The Contract Time as defined in the Bid Proposal and other sections herein incorporates 40 Rain Days per calendar year or an average of 3.33 days per calendar month. The CONTRACTOR is required to keep record of all weather related delays and to submit the monthly count on each Pay Application. The Owner's Representative shall review and sign off on this record as a part of the Pay Application approval process every month. If, during preparation of the Balancing Change Order, the status of the work progress requires an extension of the Contract Time, Impact Days shall be added to the Completion Date equal to the total number of Weather or Impact Days approved less the original 40 days resident in the original Contract Time. The Addition of Weather or Impact Days will only alter the Contract Time when added by Change Order. If the Work is completed prior to the Completion Date, No Days will be added. The addition of Weather or Impact Days shall be the CONTRACTOR's sole remedy for delays to the completion of the Work and their addition to the Contract Time shall not affect the Contract Price through any"per diem" adjustment to the General Conditions costs, Temporary Facilities costs or any other costs associated with the extension of the Contract Time. 5.03 HINDRANCES AND DELAYS. In executing the Contract, the CONTRACTOR agrees that in undertaking to complete the Work within the time herein fixed, he has taken into consideration and made allowances for all interference, disruption, hindrances and delays incident to such Work, whether growing out of delays in securing material, workmen or otherwise. No claim shall be made by the CONTRACTOR for damages, loss, costs or expense resulting from interference, disruption, hindrances or delays from any cause during the progress of any portion of the Work embraced in this Contract, except where the Work is stopped or suspended by order of the OWNER's representative and such stoppage or suspension is not attributable to any act or omission of CONTRACTOR. 5.04 SUSPENSION OF WORK. OWNER may, without cause, order the CONTRACTOR in writing to suspend the Work, in whole or in part, for such period of time as OWNER may request. The Contract Price and/or Contract Time shall be adjusted for any increase in the cost of or the time required for performance of the Work caused by such suspension. No adjustment shall be made to the extent performance was or would have been suspended by a cause for which CONTRACTOR is responsible, or to the extent an adjustment is made or denied under another provision of the Contract Documents. 5.05 LIQUIDATED DAMAGES FOR DELAY: It is understood and agreed that time is of the essence, and that the CONTRACTOR will commence the Work on the date specified herein or in any Notice to Proceed, and will Substantially Complete the Work within the Contract Time. It is expressly understood and agreed, by and between the CONTRACTOR and the OWNER, that the time for the Substantial Completion of the Work described herein is reasonable time for the completion of the same, taking into consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality. The CONTRACTOR further 10-1012 00700- 19 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT agrees that a failure to complete on time will cause damage to the OWNER and that such damages cannot be accurately measured or that ascertainment will be difficult. Therefore, the parties agree that for each and every calendar day the Work or any portion thereof shall remain uncompleted after the expiration of the Contract Time, the CONTRACTOR shall pay, as liquidated damages and as a reasonable estimate of OWNER's damages, and not as a penalty,the amount set out in the Standard Form of Agreement. However, the foregoing agreement as to liquidated damages constitutes only an agreement by the OWNER and the CONTRACTOR as to the amount of damages which the OWNER will sustain by reason of the CONTRACTOR'S failure to complete the work within the Contract Time. Should the OWNER suffer damage by reason of any other breach by CONTRACTOR, the OWNER may recover such actual damages in addition to any liquidated damages due. The OWNER shall have the right to deduct and withhold the amount of any and all such damages whether it be the minimum amount stipulated above or otherwise, from any monies owing by it to said CONTRACTOR, or the OWNER may recover such amount from the CONTRACTOR and the sureties of his bond; all of such remedies shall be cumulative and the OWNER shall not be required to elect any one nor be deemed to have made an election by proceeding to enforce any one remedy. 5.06 CHANGE OF CONTRACT TIME: The Contract Time may only be changed by a Change Order. Any claim for an adjustment of Contract Time shall be based on written notice delivered by the party making such claim to the other party and to the ENGINEER promptly, but in no event later than ten(10) days after the,event-giving rise to the claim. Notice of the extent of the claim, along with supporting data, shall be delivered within thirty (30) days of the occurrence and shall be accompanied by the claimant's written representation that the adjustment claimed is the entire adjustment to which the claimant has reason to believe it is entitled as a result of the occurrence of said event. All claims for adjustment in Contract Time shall be determined by the ENGINEER in accordance with the requirements of this paragraph. Contractor shall submit, as a minimum,the following data: A. Information showing that the time requested is not included in the existing Contract and in addition to the Contract. B. Information documenting that the number of days requested is accurate for the event. C. Revised, current construction schedule showing that the time requested affects the project's critical path. 5.07 DELAYS BEYOND OWNER'S AND CONTRACTOR'S CONTROL: Where CONTRACTOR is prevented from completing any part of the Work within the Contract Time due to delays beyond the control of the OWNER and the CONTRACTOR, including, but not limited to, interference by utility owners or other contractors performing other work, Contractor shall be entitled to an extension of the Contract Time in an amount equal to the time lost. CONTRACTOR shall not be entitled to any increase in Contract Price as a result of such delays. IN NO EVENT SHALL OWNER BE LIABLE TO CONTRACTOR FOR DAMAGES ARISING OUT OF OR RESULTING FROM (i) Delays caused by, or within the control of, the CONTRACTOR, or (ii) Delays beyond the control of both parties including, but not limited to, interference by utility owners or other contractors performing other work, fires, floods, epidemics, abnormal weather (lb\ conditions, acts of God, even if such delays are due in part to the negligence, other fault,breach of contract or warranty, violation of the Texas Deceptive Trade Act, or strict liability without regard 10-1012 00700-20 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT to fault of OWNER. An extension of Contract time shall be CONTRACTOR's sole and exclusive remedy for any such delays. Delays attributed to, and within the control of, a Subcontractor or Supplier shall be deemed to be delays within the control of the CONTRACTOR. 6.0 MEASUREMENT AND PAYMENT 6.01 DISCREPANCIES AND OMISSIONS. If the CONTRACTOR knows or reasonably should have known of any discrepancies or omissions in the Contract Documents, he shall notify the ENGINEER and obtain a clarification by Addendum before the bids are received, and if no such request is received by the ENGINEER prior to the opening of bids, then it shall be considered that the CONTRACTOR fully understands the Work to be performed and has provided sufficient sums in his Bid Proposal to complete the Work in accordance with the Contract Documents. It is further understood that any request for clarification must be submitted no later than five(5) days prior to the opening of bids. 6.02 QUANTITIES AND MEASUREMENTS. No extra or customary measurements of any kind will be allowed, but the actual measured and/or computed length, area, volume, number and weight only shall be considered,unless otherwise specifically provided. 6.03 ESTIMATED QUANTITIES. This Agreement, including the Contract Documents, and including any estimates contained therein, is intended to convey all Work to be done and material to be furnished hereunder. Where the estimated quantities are shown for the various classes of Work to be done and material to be furnished under this Contract, they are approximate and are to be used only as a basis for estimating the probable cost of the Work and for comparing the Bid Proposals offered for the Work. It is understood and agreed that the actual amount of Work to be done and the materials to be furnished under this Contract may differ from the estimates and that the items listed or estimated quantities stated, and/or any difference between estimated and actual Work, shall not give rise to a claim by the CONTRACTOR against the OWNER for loss, cost, expense, damages,unit price adjustment, quantity differences,unrecovered overhead or lost or anticipated profits, or other compensation. 6.04 PRICE OF WORK. It is agreed that it is the intent of this Contract that all Work described in the Bid Proposal, and Contract Documents, is to be done for the prices bid by the CONTRACTOR and that such prices shall include all appurtenances necessary to complete the Work in accordance with the intent of these Contract Documents as interpreted by the ENGINEER, and all costs, expenses, bond and insurance premiums, taxes, overhead, and profit. In consideration of the furnishing of all the necessary labor, equipment and material and the completion of all Work by the CONTRACTOR, and upon the completion of all Work and the delivery of all materials embraced in this Contract in full conformity with the Contract Documents, the OWNER agrees to pay to the CONTRACTOR the prices set forth in the Standard Form of Agreement, OWNER and CONTRACTOR agree that the Contract is a unit cost agreement, unless stated otherwise, and that the final Contract amount is equal to the unit cost multiplied by the number of units authorized, installed and approved by the Owner. The OWNER does not assume any obligation to pay for any services or material not actually authorized and used. The CONTRACTOR hereby agrees to receive such prices as `"--) payment in full for furnishing all materials and all labor required for the aforesaid Work, and for 10-1012 00700-21 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (111.\ all expenses incurred by him, and for full performance of the Work and the whole thereof in the manner and according to this Agreement, Contract Documents, and the requirements of the ENGINEER. 6.05 PAYMENTS. No payments made or approvals or certificates given shall be considered as conclusive evidence of the performance of the Contract, either in whole or in part, nor shall any certificate, approval or payment,be considered as acceptance of defective, deficient or non-conforming Work. CONTRACTOR shall, at any time requested during the progress of the Work, furnish the OWNER or the ENGINEER with an affidavit showing the CONTRACTOR's total outstanding indebtedness in connection with the Work. Before Final Payment is made, the CONTRACTOR shall satisfy the OWNER, by affidavit or otherwise, that there are no unpaid claims due subcontractors, suppliers or laborers by reason of any Work under the Contract. Acceptance by CONTRACTOR of Final Payment shall constitute a waiver of any and all claims of whatsoever nature against OWNER, arising out of or related to the Contract, or the Work, or any acts or omissions of OWNER or ENGINEER, which have not theretofore been timely filed as provided in this Contract. 6.06 PARTIAL PAYMENTS. When the Contract Price is a lump sum amount,prior to the first Application for Payment, CONTRACTOR shall submit to ENGINEER for review and approval a Schedule of Values, which shall fairly allocate the entire Contract Price among the various portions of the Work and shall be prepared in such form and supported by such data to substantiate its accuracy as the ENGINEER may reasonably require. The Schedule of Values shall follow the trade divisions of the Specifications so far as practicable. Upon approval, this \ Schedule of Values shall be used by ENGINEER as the basis for reviewing the Contractor's Application for Payment. Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. On or before the tenth day of each month, the CONTRACTOR shall prepare and submit to the ENGINEER, for approval or correction, an application for partial payment, being a statement showing as completely as practicable, the agreed unit quantities and extended total value of the Work done by the CONTRACTOR up to and including the twenty-fifth day of the preceding month; said statement shall also include the value of all conforming materials to be fabricated into the Work and stored in accordance with manufacturer's recommendations and as approved by the OWNER or ENGINEER at the Work site only.No payment will be made for materials stored until OWNER has approved in writing storage at the Work site. The ENGINEER shall then review such statement of unit quantities and application for partial payment and the progress of the Work made by the CONTRACTOR and, within ten days after the date ENGINEER receives CONTRACTOR's application for payment, if the application is found to be accurate and correct and the WORK conforming to the requirements of the Contract Documents, the ENGINEER shall certify the application for partial payment and shall deliver his preliminary certification for payment to the OWNER and the CONTRACTOR; or, if the ENGINEER fmds that CONTRACTOR's application for payment contains an error or is otherwise disputed, he shall notify CONTRACTOR of such error or dispute, and shall prepare a preliminary certificate for partial payment for the undisputed amount of the application for payment due CONTRACTOR, and deliver it to the OWNER and CONTRACTOR. ENGINEER'S notice to CONTRACTOR that a bona fide dispute for payment exists shall include a list of the specific reasons for nonpayment. All payment applications made by CONTRACTOR and delivered to ENGINEER and all (21.6\ verifications and certification of.such applications shall be made and transmitted within the Pro- Trak system and signed with the appropriate electronic signatures as provided for in the software. 10-1012 00700-22 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Such applications for payment shall not be considered complete unless accompanied by the 7 CONTRACTOR'S Partial Waiver of Lien and Payment Affidavit, Section 00615, duly executed by an authorized representative of the CONTRACTOR and reflecting the correct corresponding amount of the payment application. The OWNER shall then pay the CONTRACTOR, within thirty (30) days of the date of ENGINEER's receipt of the application for payment, the undisputed balance due, less applicable retainage, and further less all previous payments and all further sums that may be retained or withheld by the OWNER under the terms of this Agreement. CONTRACTOR may submit a corrected application for payment after its receipt of the ENGINEER's notice of error or dispute, and such corrected application for payment shall be reviewed by the ENGINEER and disputed or paid under the same procedure and within the same time limits set out above. As a condition of any progress payment under this Agreement, CONTRACTOR shall execute and deliver to ENGINEER and OWNER a full release of all claims, direct or indirect, at law or in equity, arising out of or related to the Work to date, excluding retainage or any claims previously submitted as required under the terms of the Contract, and specifically identified and excluded by CONTRACTOR in the release. OWNER shall be entitled to retain from each progress payment five percent (5%) of the amount thereof. Such retainage shall be retained until Final Completion and satisfaction of all conditions for Final Payment. It is understood, however, that in case the whole Work be near to completion, as certified by the ENGINEER, and some unexpected or unusual delay occurs, through no neglect or fault on the part of the CONTRACTOR, the OWNER may, upon written recommendation of the ENGINEER, pay a reasonable and equitable portion of the retained percentage to the CONTRACTOR, or the CONTRACTOR, at the OWNER'S option, may be relieved of the obligation to fully complete the Work, and thereupon, the CONTRACTOR shall receive, at the OWNER'S option, payment of the balance due him under the Contract for Work completed in accordance with the Contract Documents, subject to OWNER's rights to otherwise withhold or retain payments, and subject to the conditions set forth under"6.08 FINAL PAYMENT." The Owner at its option and in compliance with Texas law may reduce retainage to less than the above-stated percentages. 6.07 USE OF COMPLETED PORTIONS & PUNCHLIST. The OWNER shall have the right to take possession of and use any completed or partially completed portions of the Work, notwithstanding that the time for completing the entire work or such portions may not have expired; but such taking possession and use shall not be deemed an acceptance of any work not completed in accordance with the Contract Documents. If such prior use increases the cost of or delays the Work, the CONTRACTOR shall promptly and within three (3) days of OWNER's taking possession, give OWNER written notice of same, and CONTRACTOR may be entitled to such extra compensation or extension of time, or both, as may be determined in accordance with the provisions of this Agreement. 6.08 SUBSTANTIAL COMPLETION. The CONTRACTOR shall notify the OWNER AND ENGINEER, by letter executed by a duly qualified officer of CONTRACTOR, that in CONTRACTOR's opinion, the Work of the Contract, or an agreed portion thereof, is "Substantially Complete". Such notification shall include a list of all outstanding or incomplete items. Upon receipt, and within a reasonable time thereafter, of such notice, the ENGINEER and the CONTRACTOR shall jointly perform a walk-through and inspection of the Work to determine 10-1012 00700-23 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (.1.6\ the status of all or the identified portion of the work, and the ENGINEER shall prepare a detailed list of unfinished, incomplete, defective and/or non-conforming Work ("Punchlist"). If the ENGINEER determines that the Work is Substantially Complete in accordance with the Contract Documents, the ENGINEER shall issue to the OWNER and the CONTRACTOR a Certificate of Substantial Completion. OWNER shall have seven (7) days after receipt of Certificate to make written objection to the ENGINEER as to any provision of the Certificate or the attached list of non-conforming work. If ENGINEER concludes that the Work is not Substantially Complete, ENGINEER will, within fourteen (14) days, notify CONTRACTOR of the reason he believes the Work is not Substantially Complete. Upon Substantial Completion of the Work, ENGINEER will deliver to OWNER and CONTRACTOR a written recommendation as to division of responsibilities, pending fmal payment and acceptance, with respect to security, maintenance, utilities and damage to the Work, except as otherwise provided in the Certificate of Substantial Completion. NEITHER THE SUBSTANTIAL COMPLETION OF THE WORK, NOR THE OMISSION OF AN ITEM FROM THE PUNCHLIST, SHALL EXCUSE THE CONTRACTOR FROM PERFORMING ALL OF THE WORK UNDERTAKEN, WHETHER OF A MINOR OR MAJOR NATURE, AND THEREBY COMPLETING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. The Certificate of Substantial Completion shall establish the time period within which CONTRACTOR shall complete the Work for Final Acceptance by the Owner and ENGINEER. 6.08-1 OWNER shall have the right to exclude CONTRACTOR from the Work after the date of Substantial Completion, for security requirement reasons. OWNER may establish an access procedure to facilitate CONTRACTOR's uninterrupted access to the Work for the purposes of completing and correcting all items on the Punchlist in an expeditious manner. 6.09 FINAL PAYMENT. Final payment of the Retainage withheld from the Contract Price shall be made by the OWNER to the CONTRACTOR at such time as: (a) the Work, including all Change Orders and including all Punchlist work,has been fully completed in strict accordance with the Contract Documents; (b) the Contract has been fully performed except for the CONTRACTOR's responsibility to correct nonconforming Work during the warranty period set forth in the Contract Documents, and to satisfy other requirements,if any,which necessarily survive fmal payment; (c) CONTRACTOR delivers to OWNER a certificate evidencing that insurance required by the Contract Documents to remain in force after fmal payment is currently in effect and will not be cancelled or allowed to expire until at least 30 days prior written notice has been given to OWNER; (d) CONTRACTOR delivers to OWNER a Consent of Surety, if any, to final payment; (e) CONTRACTOR delivers to OWNER a complete set of As-Built Drawings, reflecting all deviations from the Plans, Specifications and approved shop drawings in the Work actually constructed, and delivers all maintenance and operating manuals and/or instructions; 10-1012 00700-24 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (f) CONTRACTOR delivers to OWNER all building certificates required prior to occupancy and all other required inspections/approvals/acceptances by city, county, state governmental entities or other authorities having jurisdiction; (g) CONTRACTOR delivers to OWNER assignments of all guarantees and warranties from subcontractors,vendors, suppliers or manufacturers, as well as names, addresses and telephone numbers of contacts for each subcontractor,vendor, supplier or manufacturer; (h) CONTRACTOR removes all equipment,tools, temporary facilities, surplus materials and rubbish from the site, and final cleans the site to OWNER's satisfaction; (i) CONTRACTOR delivers to OWNER a Full and Final Release and Affidavit of Bills Paid in the form attached hereto as Attachment No. 2, executed by CONTRACTOR; (j) CONTRACTOR delivers to OWNER all other documentation required to be submitted to OWNER pursuant to the Contract Documents,including but not limited to any special guarantees or warranties, operation and maintenance manuals, etc'. in each case in a form satisfactory to OWNER as determined in OWNER's sole discretion; and (k) the Final Application for Payment has been approved by the ENGINEER and OWNER. ram') Acceptance of Final Payment by the CONTRACTOR shall constitute a waiver of all claims by CONTRACTOR against OWNER other than any claims previously made in writing by CONTRACTOR against OWNER, and still unsettled, and except for claims arising out of third party actions, cross-claims and counterclaims. No interest shall be due or payable by OWNER to CONTRACTOR on any sums retained or withheld.by OWNER pursuant to the terms or provisions of the Contract Documents, except as otherwise provided by applicable law. Neither the Certificate of Substantial Completion nor the Final Payment nor possession or acceptance of the Work shall relieve the CONTRACTOR of its obligation for correction of defective or non- conforming Work, or for fulfillment of any warranty, which may be required by law or by the Contract Documents. 6.10 CORRECTION OF WORK BEFORE FINAL PAYMENT. The CONTRACTOR shall promptly remove from OWNER's premises all materials, equipment or Work which is defective or otherwise not in conformance with the Contract Documents, whether actually incorporated in the Work or not, and CONTRACTOR shall, at his own expense, promptly replace such materials, equipment or Work with other materials conforming to the requirements of the Contract. The CONTRACTOR shall also bear the expense of restoring all work of CONTRACTOR or other contractors damaged by any such removal or replacement. If CONTRACTOR does not remove and replace any such unsuitable Work within ten (10) business days after receipt of a written notice from the OWNER or the ENGINEER, the OWNER may remove,replace and remedy such work at CONTRACTOR's expense. 10-1012 00700-25 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 6.11 CORRECTION OF WORK AFTER FINAL PAYMENT. If within one (1) year 7", from the date of Substantial Completion or such longer period of time as may be prescribed by law or by the terms of any applicable special warranty required by the Contract Documents, any of the Work is found to be defective or not in accordance with the Contract Documents, CONTRACTOR shall, at its sole cost, correct it and any other work affected thereby promptly after receipt of a written notice from OWNER to do so. In addition, CONTRACTOR shall be responsible for any damage to building contents, when such damage results from the CONTRACTOR's use of faulty materials or defective workmanship; to the extent such damage is not covered by OWNER's insurance. This warranty period shall renew and recommence for each corrected item of Work upon completion of the remedial work. This time period for correction by CONTRACTOR is in addition to, and not in lieu of, all warranties or remedies, which exist at common law or by statute. These warranty obligations shall survive the termination of this Contract, and shall be enforceable by a decree of specific performance, in addition to such other rights and remedies available to OWNER at law or in equity. 6.12 PAYMENTS WITHHELD. The OWNER may withhold, or on account of subsequently discovered evidence nullify and demand immediate repayment of, the whole or part of any certificate for payment or payment, to such extent as may be necessary to protect OWNER from loss on account of: (a) Defective or non-conforming Work not remedied; (b) Claims filed or reasonable evidence indicating probable filing of claims; (c) Failure of the CONTRACTOR to make payments promptly to subcontractors or for material or labor; (d) Damage to another contractor, OWNER, existing improvements on the site, or to adjacent or adjoining property; (e) Reasonable doubt that the Work can be completed for the unpaid balance of the Contract amount; (f) Reasonable indication that the Work will not be completed within the Contract Time; (g) Failure on the part of the CONTRACTOR to execute any and all documents, releases or other documents presented to the CONTRACTOR for execution, as provided for herein or otherwise; (h) Liquidated or other damages due.to late completion; and/or (i) Any breach by CONTRACTOR of this Contract or any other agreement between OWNER and CONTRACTOR. When the above grounds are removed to OWNER's satisfaction, the withheld payment shall be made promptly. If the said causes are not so remedied, OWNER may remedy the same for CONTRACTOR's account, charge the entire cost thereof to CONTRACTOR and deduct such cost 10-1012 00700-26 of 36 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT from the Contract Sum or from any payments due or to become due under any other agreement between OWNER and CONTRACTOR. 6.13 DELAYED PAYMENTS. Should the OWNER fail to make payment to the CONTRACTOR when payment is due in accordance with the terms of the Contract Documents, any interest due CONTRACTOR for late payments shall accrue and be paid in accordance with the provisions of Chapter 2251 of the Texas Government Code, as amended, and payment of such interest shall fully liquidate and compensate any injury to the CONTRACTOR growing out of such delay in payment. Should OWNER fail to pay CONTRACTOR an undisputed amount due within the time limits provided in the Contract or applicable law, CONTRACTOR shall give the notice required and comply with the provisions of Section 2251.051 of the Texas Government Code, and shall thereupon be entitled to the rights and remedies provided therein. 7.0 EXTRA WORK AND CLAIMS 7.01 DIFFERING SITE CONDITIONS. During the progress of the work, if subsurface, latent physical conditions or unknown physical conditions of an unusual nature are encountered at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, the CONTRACTOR shall notify the OWNER's Representative in writing within three (3) calendar days of the specific differing conditions before the site is disturbed and before the affected work is performed. (a)Upon written notification, the ENGINEER will investigate the conditions, and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding anticipated profits, will be made and the contract modified in writing accordingly. The ENGINEER will notify the CONTRACTOR in writing of the determination whether or not an adjustment of the contract is warranted. (b)No contract adjustment which results in a benefit to the CONTRACTOR will be allowed unless the CONTRACTOR has provided the required written notice. (c)No contract adjustment will be allowed under this clause for any effects caused on unchanged work. 7.02 SUSPENSIONS OF WORK ORDERED BY THE ENGINEER. If the performance of all or any portion of the work is suspended by the ENGINEER in writing for seven(7) calendar days and the CONTRACTOR believes that additional compensation and/or contract time is due as a result of such suspension,the CONTRACTOR shall submit a written request for adjustment to the ENGINEER within seven(7) calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment. (a)Upon receipt, the ENGINEER will evaluate the CONTRACTOR's request. If the ENGINEER agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the CONTRACTOR, its suppliers, or subcontractors at any approved tier, and not caused by weather, the ENGINEER will make 10-1012 00700-27 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (mi.\ an adjustment(excluding profit) and modify the contract in writing accordingly. The CONTRACTOR will be notified of the ENGINEER's determination, in writing,whether or not an adjustment of the contract is warranted. (b)No contract adjustment will be allowed unless the CONTRACTOR has submitted the request for adjustment within the time prescribed. (c)No contract adjustment will be allowed under this clause to the extent that performance would have been suspended by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this contract. 7.03 CHANGE ORDERS.Without invalidating this Agreement,the OWNER may, at any time or from time to time, order additions,deletions or revisions to the Work; such changes will be authorized by Change Order to be prepared by the ENGINEER for execution by the OWNER and the CONTRACTOR. The Change Order shall set forth the basis for any change in Contract Price, as hereinafter set forth for Extra Work, and any change in Contract Time,which may result from the change. 7.04 In accordance with paragraph 1.07 CONTRACTOR'S request to work weekends, the Owner's Construction Manager shall,upon receipt of written notice by the CONTRACTOR of the need to conduct work on otherwise non-Work Days,prepare a cost estimate for providing Construction Management and Inspection services during the requested period and submit this to both OWNER and CONTRACTOR. If approved by both parties the Construction Manager shall prepare a Deductive Change Order in the amount stated in the estimate for the signature of the CONTRACTOR and the OWNER for inclusion in the next Pay Application. The Deductive Change Order must be signed and executed by both the OWNER and CONTRACTOR prior to start of work on any non-Work Day. 7.05 MINOR CHANGES. The ENGINEER may authorize minor changes in the Work not inconsistent with the overall intent of the Contract Documents and not involving an increase in Contract Price or time. If the CONTRACTOR believes that any minor changes authorized by the ENGINEER involves Extra Work or entitles him to an increase in the Contract Price or the Contract Time, the CONTRACTOR shall give notice of same by written request to the ENGINEER for a written Work Order, with a copy to OWNER. Any such notice and request by the CONTRACTOR shall be given prior to beginning the changed work. CONTRACTOR's commencement of any minor change in the Work prior to such written notice and request shall constitute a waiver of any and all claims for an increase in the Contract Price or the Contract Time arising out of or related to such changed work. 7.06 EXTRA WORK. It is agreed that the CONTRACTOR shall perform all work when presented with a written Change Order, Work Change Directive or Work Order signed by the ENGINEER, subject, however, to the right of the CONTRACTOR to require written confirmation of such Change Order, Work Change Directive or Work Order by the OWNER. It is agreed that the basis of compensation or adjustment to the CONTRACTOR for work either altered, added or deleted by a Change Order or Work Change Directive, or for which a claim for Extra Work is made, shall be determined by one or more of the following methods: C.11\ Method(A)--By Contract unit prices applicable to the work, if any; or 10-1012 00700-28 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT n Method(B)--By agreed unit prices or agreed stipulated lump sum price; or Method(C) --If neither Method (A) nor Method (B) can be agreed upon before the Extra Work is commenced, then the CONTRACTOR shall be paid the "Actual Field Cost" of the work plus: a) For subcontractors performing work mark-up shall be limited to fifteen percent, ten(10%) for the subcontractor plus five(5%) for the General Contractor or b)For the General Contractor alone, self-performing the extra work,without subcontractor, the mark-up shall not exceed ten percent (10%), as full and final compensation for the Extra Work and all costs and expenses, direct or indirect, arising out of or related thereto. In the event said Extra Work or Change Order or Work Change Directive work is performed and paid for under Method (C), then the provisions of this paragraph shall apply and the "Actual Field Cost" is hereby defined as the cost to the CONTRACTOR of all workers, such as foremen, timekeepers, mechanics and laborers, and materials, supplies, trucks, rentals of machinery and equipment, for the time actually employed or used on such Extra Work or Change Order or Work Change Directive work, plus actual transportation charges necessarily incurred together with all power, fuel, lubricants, water and similar operating expenses, plus all necessary incidental expenses incurred directly on account of such Extra Work, including Social Security, Old Age Benefits and other payroll taxes, and a rateable proportion of premiums on Performance and Payment Bonds and Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation, and all other insurance as may be required by law or ordinance, or the Contract Documents,plus all payments to subcontractors for such work. The ENGINEER may direct the form in which accounts of the "Actual Field Cost" shall be kept and the records of these accounts shall be made available to the ENGINEER. The ENGINEER or OWNER may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise these matters shall be determined by the CONTRACTOR. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using one hundred percent (100%), unless otherwise specified, of the latest schedule of Equipment Ownership Expense adopted by the Associated General Contractors of America where practicable. The mark-up of the "Actual Field Cost" to be paid to the CONTRACTOR, shall cover and compensate him for his profit, overhead, and all other elements of cost and expense not embraced within the "Actual Field Cost" as herein defined, save that where the CONTRACTOR's field office must be maintained solely on account of such Extra Work, then the cost to maintain and operate the same shall be included in the "Actual Field Cost." No claim for Extra Work of any kind will be allowed unless ordered by the ENGINEER in a written Work Order. In case any orders or instructions, either oral or written, appear to the CONTRACTOR to involve Extra Work for which he should receive compensation or an adjustment in the Contract Time, he shall make written request to the ENGINEER for a written Work Order authorizing such Extra Work within ten (10) days of ENGINEER's orders or instructions, otherwise the orders or instructions will be considered minor changes. The issuance of a Work Order by the ENGINEER shall not constitute or be construed as an agreement or 10-1012 00700-29 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT acknowledgement by the ENGINEER that the work which is the subject of the Work Order is Extra Work outside the scope of the Contract Work, but shall merely constitute a direction to the CONTRACTOR to perform the work, and the CONTRACTOR shall proceed with the work, and shall keep an accurate account of the "Actual Field Cost" thereof, as provided under Method (C). Upon completion of the alleged Extra Work, the CONTRACTOR shall promptly and within ten (10) days submit his claim to the ENGINEER by proper certification and attestation, on forms provided by the ENGINEER. The ENGINEER shall render a written decision on CONTRACTOR's claim within ten (10) days. It is mutually agreed between the parties that the ENGINEER's decision on all claims or questions in relation to the Work, CONTRACTOR's performance of the Work, any changes in the Work or Extra Work, the Contract Price and/or the Contract Time, shall be fmal and conclusive and binding upon the parties. If the ENGINEER shall fail to respond in writing to CONTRACTOR's claim within thirty (30) days of the date of submission, or if CONTRACTOR shall dispute or object to ENGINEER's decision on any claim, and CONTRACTOR fails to file a Request for Mediation of such claim in accordance with the provisions of Article 9.0,within sixty(60) days after the date of submission to the ENGINEER, or such longer period as the parties may agree to in writing, the CONTRACTOR shall lose and forfeit his right to make such claim for Extra Work at any later date, and all such claims held by the CONTRACTOR shall be deemed waived, forfeited and forever barred. CONTRACTOR shall continue to diligently prosecute the Work notwithstanding any pending claim, dispute, or dispute resolution process between OWNER and CONTRACTOR. 7.07 TIME OF FILING CLAIMS. Except as otherwise provided herein, all questions of dispute or adjustment shall be made within the Pro-Trak system and filed with the ENGINEER Clak.\ within three (3) days after the ENGINEER has given any directions, order or instruction to which the CONTRACTOR desires to take exception. The ENGINEER shall reply within thirty(30) days to such written exceptions, and render his fmal decision in writing. It is mutually agreed between the parties that the ENGINEER's decision on all claims or questions in relation to the Work, CONTRACTOR's performance of the Work, any changes in the Work or Extra Work, the Contract Price and/or the Contract Time, shall be fmal and conclusive and binding upon the parties. In case the CONTRACTOR should desire to appeal from the ENGINEER's decision, the CONTRACTOR may request a meeting between representatives of the OWNER and the CONTRACTOR for the purposes of appealing the ENGINEER's decision directly to the OWNER, such meeting to occur within ten (10) days after the date of the CONTRACTOR's request, or such longer. period as may be agreed to by the parties in writing. If the CONTRACTOR shall still be aggrieved after a meeting with the OWNER and/or his representative, the CONTRACTOR shall have sixty (60) days after the date of the meeting, or such longer period as the parties may agree.to in writing, to file a Request for Mediation of such claim in accordance with the provisions of Article 9.0. In the event the CONTRACTOR shall fail, for any reason,to timely file a Request for Mediation,the OWNER shall be released of any and all liability, and the CONTRACTOR's failure to timely file a Request for Mediation shall constitute a waiver, forfeit and final bar of all such claims held by the CONTRACTOR against the OWNER. CONTRACTOR shall continue to diligently prosecute the Work notwithstanding any pending claim, dispute, or dispute resolution process between OWNER and CONTRACTOR. 8.0 DEFAULT 8.01 DEFAULT BY CONTRACTOR. In case the CONTRACTOR should abandon and fail or refuse to resume Work within five (5) days after written notification from the OWNER 10-1012 00700-30 of 36 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT or the ENGINEER, or if the CONTRACTOR fails to comply with the orders of the ENGINEER when such orders are consistent with the Contract Documents,or if the CONTRACTOR otherwise defaults on its obligations under the Contract, OWNER shall have the right, if it so elects and without prejudice to any other rights it may have, after giving five (5) days written notice of default to CONTRACTOR and any surety, to terminate the Contract or any part thereof and/or to take over or cause others to take over the Work or any part thereof, and to complete such Work for the account of CONTRACTOR. Where Performance and Payment Bonds exist, the sureties on these bonds shall be directed to complete the Work in conjunction with the notice of default, and a copy of said notice shall be delivered to the CONTRACTOR. After receiving said notice of default,the CONTRACTOR shall promptly and within no more than three (3) days, remove from the Work any machinery, equipment, or tools then on the job, not intended for incorporation into the Work. Should CONTRACTOR fail to promptly remove such machinery, equipment or tools, OWNER may remove such machinery, equipment or tools and store same at CONTRACTOR's expense; return such machinery, equipment or tools to their purported owner; or otherwise dispose of such machinery, equipment or tools as OWNER sees fit. Any materials, supplies and/or equipment delivered for use in the Work, may be used in the completion of the Work by the OWNER or the surety on the Performance Bond, or another contractor in completion of the Work; it being understood that the use of such equipment, supplies and materials will ultimately reduce the cost to complete the Work and be reflected in the final settlement. Where there is no Performance Bond or in case the surety should fail to commence compliance with the notice for completion hereinabove provided for within ten (10) days after the service of such notice, then the OWNER may provide for completion of the Work in either of the following elective manners: (a) The OWNER may thereupon employ such force of workers and use such machinery, equipment, tools, materials and supplies as the OWNER may deem necessary to expeditiously complete the Work, and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said CONTRACTOR, and expense so charged shall be deducted and paid by the OWNER out of such monies as may be due or that may thereafter at any time become due to the CONTRACTOR under and by virtue of this Agreement or any other agreement between OWNER and CONTRACTOR. In case such expense is less than the sum which would have been payable under this Contract if the same had been completed by the CONTRACTOR, then said CONTRACTOR shall be credited with the difference. In case such expense is greater than the sum which would have been payable under this Contract if the same had been completed by such CONTRACTOR, then the CONTRACTOR and/or his surety shall promptly pay the amount of such excess to the OWNER upon demand; or (b) The OWNER, under sealed bids, under the times and procedures provided for by law, may let the contract for completion of the Work under substantially the same terms and conditions which are provided in this Contract. In case of any increase in cost to the OWNER under the completion contract, as compared to what would have been the cost under this Contract, such increase shall be charged to the CONTRACTOR, and the amount of such increase may be deducted by the OWNER out of such monies as may be due or that may thereafter at any time 10-1012 00700-31 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT become due to the CONTRACTOR under and by virtue of this Agreement or any other agreement between OWNER and CONTRACTOR, or the CONTRACTOR and/or his surety shall promptly pay the amount of such increase to the OWNER upon demand. However, should the cost to complete any such completion contract prove to be less than what would have been the cost to complete under this Contract,the CONTRACTOR and/or his surety shall be credited therewith. In the event of a default by CONTRACTOR, no further payments shall be made to CONTRACTOR under the Contract until the Work is Finally Completed. When the Work shall have been Finally Completed, the CONTRACTOR and his surety shall be so notified. A complete itemized statement of the Contract accounts, certified by the ENGINEER as being correct, shall then be prepared and delivered to the CONTRACTOR and his surety, whereupon the CONTRACTOR and/or his surety shall pay the balance due as reflected by said statement. The OWNER, prior to incurring an obligation to make payment hereunder, shall have such statement of completion attested to by the CONTRACTOR and the surety as accurate, and in exchange for payment of the sum stated therein, the OWNER shall be entitled to a full and final release of any claims or demands by the CONTRACTOR or the surety. In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the OWNER had the work been completed by the CONTRACTOR under the terms of this Contract, or when the CONTRACTOR and/or his surety shall pay the balance shown to be due by them to the OWNER, then all machinery, equipment, tools or supplies left on the site of the Work shall be turned over to the CONTRACTOR and/or his surety. Should the cost to complete the Work exceed the Contract Price, and the CONTRACTOR and/or his surety fail to pay the amount due the OWNER within the time designated above, and there remains any machinery, equipment, tools, materials or supplies which are the property of CONTRACTOR on the site of the Work, notice thereof, together with an itemized list of such equipment and materials, shall be mailed to the CONTRACTOR and his surety at the respective addresses designated in the Contract, provided, however, that actual written notice given in any manner will satisfy this condition. After mailing or other giving of such notice, such property shall be held at the risk of the CONTRACTOR and his surety, subject only to the duty of the OWNER to exercise ordinary care to protect such property. After fifteen (15) days from the date of such notice, the OWNER may sell such property, equipment, tools, materials or supplies, and apply the net sum derived from such sale to the credit of the CONTRACTOR and his surety. Such sale may be made at either public or private sale, with or without notice, as the OWNER may elect. The OWNER shall release any machinery, equipment, tools, materials or supplies, which remain on the Work, and belong to persons other than the CONTRACTOR or his surety, to their reputed owners. 8.02 SUPPLEMENTATION OF CONTRACTOR FORCES. If CONTRACTOR at any time shall, in OWNER'S sole opinion, fail to furnish skilled workers, suitable materials, supplies or adequate equipment sufficient for the prompt, timely and diligent prosecution of the Work in accordance with OWNER's direction, OWNER shall have the right, without prejudice to the exercise of other remedies for the same default_and without fully taking over the Work, to supplement CONTRACTOR's forces and to expedite delivery of and to procure and furnish such workers, materials, tools, supplies or equipment for CONTRACTOR's account by employing other contractors and suppliers engaged in the same class of work and charge the entire cost thereof to CONTRACTOR, said cost to be deducted from sums due or to become due to 10-1012 00700-32 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT CONTRACTOR under the Contract or any other agreement with OWNER or any parent, subsidiary or affiliate of OWNER. 8.03 CUMULATIVE REMEDIES & SPECIFIC PERFORMANCE. All rights and remedies of OWNER, under the terms of the Contract and/or available at law or in equity, are cumulative. In the event CONTRACTOR or any of its subcontractors, vendors or suppliers fails or refuses for any reason to provide timely manufacture, fabrication, delivery, installation, erection, construction or completion of any supplies, materials, expendables, equipment, machinery, accessories or appurtenances to be furnished hereunder, CONTRACTOR acknowledges and agrees that such items are required, necessary, essentially unique to the Project and the Work and will cause irreparable harm to OWNER and the Project if not furnished in accordance with the Contract, and OWNER shall have the right to obtain a decree of specific performance and mandatory injunctive relief from any Court of competent jurisdiction to ensure the timely furnishing of such items. 8.04 CROSS-DEFAULT. If, for any reason, CONTRACTOR is declared in default and/or terminated by OWNER under any other agreement with OWNER, whether related to the Project or not related to the Project, OWNER shall have the right to offset and apply any amounts which might be owed to OWNER by CONTRACTOR under any other such agreements against any earned but unpaid amounts owing to CONTRACTOR by OWNER under the Contract, any retainage earned by CONTRACTOR under the Contract or any unearned, unpaid amount under the Contract. 8.05 INSOLVENCY. It is recognized that if CONTRACTOR becomes a debtor in voluntary or involuntary bankruptcy proceedings, makes a general assignment for the benefit of creditors, or if a receiver is appointed on account of his insolvency, such events could seriously impair or frustrate CONTRACTOR's performance of the Work. Accordingly, it is agreed that should CONTRACTOR become a debtor in bankruptcy, either voluntary or involuntary, CONTRACTOR shall notify OWNER in writing within twenty-four (24) hours of the filing with the bankruptcy court. Further, it is agreed that upon occurrence of any one or more such events, OWNER shall be entitled to request of CONTRACTOR or its successors, trustees or receivers, adequate assurances of future performance. In the event such adequate assurances are not given to the reasonable satisfaction of OWNER within seventy-two (72) hours of such request, OWNER shall have the right to immediately invoke the remedies of this Section 8 or as provided by law. Pending receipt of such adequate assurances of such future performance, OWNER may proceed with the Work on a temporary basis and deduct the costs, plus reasonable overhead and profit, from any amounts due or which may become due to CONTRACTOR under the Contract or any other agreement with OWNER. In this regard, OWNER and CONTRACTOR agree that delays in performance could result in more damages to CONTRACTOR than would be sustained if OWNER failed to exercise such remedies. 8.06 CONTINGENT ASSIGNMENT. CONTRACTOR hereby assigns to OWNER, all of CONTRACTOR's rights under and interest in any and all subcontracts and/or purchase orders entered into by CONTRACTOR pursuant to this Agreement, such assignment to become effective upon CONTRACTOR's default under this Agreement or OWNER's termination of this Contract, and OWNER's acceptance of such assignment. Upon CONTRACTOR's default or OWNER's termination of this Contract, OWNER may, in the event there is no performance bond for the Contract,or in the event the performance bond surety fails to complete the Contract, or if OWNER otherwise so elects in its sole discretion, accept such assignment by written notice of such 10-1012 00700-33 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT CI acceptance to CONTRACTOR and subcontractor, and may require subcontractors to perform all of the then unperformed duties and obligations under the subcontract, for the direct benefit of OWNER. In the event OWNER requires such performance by a subcontractor, then OWNER shall be obligated to pay such subcontractor any amounts due and owing under the terms of the subcontract/purchase order, at the subcontract prices and rates, and subject to any rights of withholding or offset and other terms and conditions of the subcontract, for all work properly performed by such subcontractor, to the date of OWNER's acceptance and thereafter. OWNER's liability in this connection, however, shall not exceed the amount obtained by subtracting all payments made by CONTRACTOR to subcontractor from the Subcontract Price at the time of CONTRACTOR's default or OWNER's termination of CONTRACTOR. CONTRACTOR shall include a provision in its subcontracts that allows such assignment and allows OWNER to take these actions, and further provides that in the event of CONTRACTOR's termination for default, the subcontractor agrees to give the OWNER or its agent the right to inspect all books and records of subcontractor relating to the Work. 8.07 WAIVER OF CONSEQUENTIAL DAMAGES. CONTRACTOR expressly waives any and all claims for consequential damages against OWNER arising out of or related to this Contract, or any other agreements between CONTRACTOR and OWNER, including,but not limited to, claims for damages incurred by CONTRACTOR for principal office expenses, including the compensation of personnel stationed there, losses of financing, bonding capacity, business and reputation,and claims for lost profit,whether on this Contract or otherwise. 8.08 TERMINATION FOR CONVENIENCE. OWNER may at its sole discretion, upon five (5) days written notice to CONTRACTOR, terminate this Contract, in whole or in part, t` if and when OWNER determines that it is in the best interest of OWNER to do so. Upon receipt of such written notice from OWNER, CONTRACTOR shall cease all terminated Work and take reasonable precautions to protect and preserve such work, and shall take all reasonable measures after consultation with OWNER to terminate or assign to OWNER all subcontracts, purchase orders or other commitments related to the Work or the Project on terms and conditions acceptable to OWNER. CONTRACTOR will be paid for all Work performed in strict accordance with the Contract Documents, based upon the Contract Price and the percentage of completion on the date of termination, and less amounts previously paid, subject to any reasonable backcharges attributable to CONTRACTOR's failure to comply with any of the provisions of this Contract and further subject to the other terms of this Contract regarding payment. In no event will CONTRACTOR receive or be entitled to any payment or compensation whatsoever for interruption of business or loss of business opportunities, any other items of consequential damages, for overhead or loss of profits on the unperformed Work and/or services and unfurnished materials or for any intangible, impact or similarly described cost, damages or expense, and under no circumstances shall the total sum paid to or received by CONTRACTOR under this Contract exceed the Contract Price. The compensation provided herein shall be CONTRACTOR's sole and exclusive remedy arising out of a termination for convenience. 8.09 DEFAULT BY OWNER. In case the OWNER shall default on its material obligations under this Contract, other than OWNER's failure to pay CONTRACTOR a disputed amount due within the time limits provided in the Contract or applicable law, as addressed by Section 6.13 of this Agreement, and shall fail or refuse to cure, or to commence and diligently pursue cure of such default within fifteen (15) days after written notification by the (4.11'` CONTRACTOR, then the CONTRACTOR may suspend or wholly abandon the Work, and may remove therefrom all machinery, tools and equipment, and all materials on the site of the Work 10-1012 00700-34 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT that have not been included in payments to the CONTRACTOR and have not been incorporated into the Work. And thereupon, the ENGINEER shall make an estimate of the total amount earned by the CONTRACTOR, which estimate shall include the value of all Work actually completed by said CONTRACTOR (at the Contract Prices), the value of all partially completed Work at a fair and equitable price, and the amount of all Extra Work performed at the prices agreed upon, or provided for by the terms of this Contract, and a reasonable sum to cover the cost of any provisions made by the CONTRACTOR to carry the whole Work to completion and which cannot be utilized. The ENGINEER shall then make a final statement of the balance due the CONTRACTOR by deducting from the above estimate all previous payments by the OWNER and all other sums that may be retained by the OWNER under the terms of this Agreement, and shall present the same to the OWNER, and OWNER's payment of said sum to the CONTRACTOR, on or before thirty (30) days after OWNER's receipt of such statement, shall satisfy any and all rights, claims or causes of action of CONTRACTOR arising out of or related to such default by OWNER, and shall be CONTRACTOR's sole and exclusive remedy for such default. A disputed or unilateral claim by the Contractor cannot by itself constitute a default hereunder. 9.0 DISPUTE RESOLUTION Any dispute or pending claim or dispute resolution process between OWNER and CONTRACTOR shall not excuse or relieve CONTRACTOR of its obligations under the Contract, and CONTRACTOR shall diligently prosecute the Work notwithstanding any pending claim, dispute, or dispute resolution process between OWNER and CONTRACTOR. All claims, disputes and other matters in question arising out of or relating to, the Contract, or the breach thereof; shall be subject to mediation as a condition precedent to any other dispute resolution process as may be selected by OWNER. Unless mutually agreed otherwise the mediation shall be conducted by a third party who will be selected by agreement between OWNER and CONTRACTOR, and Request for Mediation shall be filed with the other party. The parties shall share the mediator's fee and any filing fees equally. If a claim, dispute or other matter in question between OWNER and CONTRACTOR involves the work of a subcontractor or supplier, OWNER or CONTRACTOR may join such subcontractor or supplier as a party to any mediation proceeding between OWNER and CONTRACTOR hereunder. CONTRACTOR shall include in all subcontracts and/or purchase orders related to the Work a specific provision whereby the subcontractor or supplier consents to being joined in mediation between OWNER and CONTRACTOR involving the work of such subcontractor or supplier. This Contract shall be governed by the laws of the State of Texas and shall be considered performable in Brazoria County, Texas, for venue purposes. Further, the OWNER and CONTRACTOR stipulate that venue for any dispute resolution proceeding involving or touching upon the Contract other than the conduct of an arbitration hearing shall be in Brazoria County, Texas, or, if such choice of venue is prohibited or unenforceable by law, shall be held in the county where the Project is located. CONTRACTOR agrees to pay OWNER all reasonable attorneys' fees incurred by OWNER in the event OWNER seeks to enforce any provision of this Contract whether by arbitration or other dispute resolution process. Further, in the event OWNER defends any claim n instituted by CONTRACTOR against OWNER, whether in arbitration or other dispute resolution 10-1012 00700-35 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Cb's' process, CONTRACTOR agrees to pay OWNER all reasonable attorneys' fees incurred by OWNER in defending such claim provided OWNER is the prevailing party, in whole or in part, in such proceeding. 10-1012 00700-36 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ATTACHMENT NO. 1 TO GENERAL CONDITIONS WORKERS' COMPENSATION INSURANCE COVERAGE A. DEFINITIONS: Certificate of coverage ("certificate") _A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC81, TWCC-82, TWCC-83 or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project for the duration of the Project. Duration of the Project.includes the time from the beginning of the Work on the Project until the contractor's/person's work on the Project has been completed and the Project warranty period has expired. Persons providing services on the project includes persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with due contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, motor carriers and owner- operators, (as defined at Section 406.121 of the Texas Labor Code), leasing companies, and employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The CONTRACTOR shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Title 5 Workers' Compensation, Subtitle A Texas Workers' Compensation Act, for employees of the contractor providing services on the project, for the duration of the project. C. The CONTRACTOR must provide a certificate of coverage to the OWNER prior to being awarded the Contract. D. If the coverage period shown on the CONTRACTOR's current certificate of coverage ends during the duration of the project, the CONTRACTOR must, prior to the end of the coverage period, file a new certificate of coverage with the OWNER showing that coverage has been extended. E. The CONTRACTOR shall obtain from each subcontractor or other person providing services on a project, and provide to the OWNER: (I) a certificate of coverage,prior to that person beginning work on the Project, so the OWNER will have on file certificates of coverage showing coverage for all n persons providing services on the Project; and 05/2007 00700-Al CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT • (2) no later than seven days after receipt by the CONTRACTOR and prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. F. The CONTRACTOR shall retain all required certificates of coverage for the duration of the Project and for one year thereafter. G. The CONTRACTOR shall notify the OWNER in writing by certified mail or personal delivery, within 10 days after the CONTRACTOR knew or should have known, of any changes that materially affect the provision of coverage of any person providing services on the Project. H. The CONTRACTOR shall post on each Project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. NOTICE REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing C116b\I services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at (512) 440- 3789 to receive information on the legal requirements for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." The CONTRACTOR shall contractually require each person with whom it contracts to provide services on a project,too: (1) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Title 5 Workers' Compensation, Subtitle A Texas Workers' Compensation Act, for all of its employees providing services on the Project, for the duration of the Project; (2) provide to the CONTRACTOR,prior to that person beginning work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the Project: 05/2007 00700-A2 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (3) provide the CONTRACTOR,prior to the end of the coverage period, a new certificate of coverage, showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; (4) obtain from each other person with whom it contracts, and provide to the CONTRACTOR: (a) a certificate of coverage,prior to the other person beginning work on the Project; and (b) a new certificate of coverage showing extension of coverage,prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; (5) retain all required certificates of coverage on file for the duration of the Project and for one year thereafter; (6) notify the OWNER in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project; and (7) contractually require each person with whom it contracts,to perform as required by paragraphs (1) -(7),with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this Contract or providing or causing to be provided a certificate of coverage, the CONTRACTOR is representing to the OWNER that all employees of the CONTRACTOR who will provide services on the Project will be covered by workers' compensation coverage for the duration of the Project, that the coverage agreements will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the CONTRACTOR to administrative penalties, criminal penalties, civil penalties, or other civil actions. K. The CONTRACTOR's failure to comply with any of these provisions is a breach of contract by the CONTRACTOR, which entitles the OWNER to pursue all rights and remedies available to it under the Contract, at law or in equity, if the CONTRACTOR does not remedy the breach within ten days after receipt of notice of breach from the OWNER. 05/2007 00700-A3 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ATTACHMENT NO.2 TO GENERAL CONDITIONS AGREEMENT FOR FINAL PAYMENT AND CONTRACTOR'S SWORN RELEASE In consideration of the Final Payment under that certain contract between [Contractor's Company Name] (hereafter "CONTRACTOR") and the City of Pearland (hereafter "OWNER") for the Project known as Quiet Zone Crossing And Median Improvements (the "Contract"), the CONTRACTOR makes the following representations to OWNER, either individually if a proprietorship, or jointly and severally by all general partners if a partnership, or if a corporation, by action of the president and secretary of said corporation, as duly authorized by appropriate action of the stockholders and/or board of directors of said corporation, their signatures hereon constituting a representation under oath by said individuals that they have the authority to execute this Agreement for and on behalf of the said corporation: 1. The undersigned CONTRACTOR represents to OWNER that the Application for Payment for the Final Payment under the Contract, and the fmal Change Order issued under the Contract if any, whether or not modified, corrected or changed in some way by the ENGINEER, the CONTRACTOR or the OWNER, a copy of which are attached hereto and marked Exhibit "A", are true, correct and accurate, and that CONTRACTOR has received payment in full for all other Applications for Payment submitted under the Contract, and that CONTRACTOR has been fully compensated for all labor, materials, equipment and/or services furnished in connection with the Contract, except for the Final Payment. 2. It is agreed and stipulated by the undersigned CONTRACTOR that upon the receipt of Final Payment in the amount as set out on the attached Application for Payment, the CONTRACTOR, by execution of this instrument of release, does, therefore, RELEASE and FOREVER DISCHARGE OWNER of and from all manner of debts, claims, demands, obligations, suits, liabilities and causes of action of any nature whatsoever, at law or in equity, in contract or in tort, now existing or which may hereafter accrue, arising out of or related to the Contract, any Change Orders or Work Orders, the Work, or any labor, materials, equipment or services furnished by CONTRACTOR to OWNER. 3. The CONTRACTOR, acting by and through the person or persons whose names are subscribed hereto, does solemnly swear and affirm that all bills and claims have been paid to all materialmen, suppliers, laborers, subcontractors, or other entities performing services or supplying materials or equipment, and that OWNER shall not be subject to any bills, claims, demands, litigation or suits in connection therewith. 4. It is further specifically understood and agreed that this Agreement for Final Payment and Contractor's Sworn Release shall constitute a part of the Contract, and it is also specifically understood and agreed that this Agreement shall not act as a modification, waiver or renunciation by OWNER of any of its rights or remedies as set out in the Contract itself, but this Agreement for Final Payment and Contractor's Sworn Release shall constitute a supplement thereto for the additional protection of OWNER. 05/2007 00700-B 1 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT SIGNED and EXECUTED this,the day of ,20 . CONTRACTOR: By: Signature Print Name: Title: [If CONTRACTOR is a proprietorship, owner must sign; if a partnership, each general partner must sign; if a corporation, the following language should be used.] SIGNED and EXECUTED this, the day of 20 by , a Texas corporation,under authority �'^°� granted to the undersigned by said corporation as contained in the Charter,By-Laws or Minutes of J a meeting of said corporation regularly called and held. CONTRACTOR: By: President ATTEST: Corporate Secretary (Corporate Seal) [This form is for use by either a proprietorship or a partnership. In the event CONTRACTOR is a partnership or a joint proprietorship, additional signature lines should be added for each individual.] 05/2007 00700-B2 CITY OFPEARLAND GENERAL CONDITIONS OF AGREEMENT AFFIDAVIT STATE OF TEXAS § COUNTY OF § BEFORE ME,the undersigned authority, on this day personally appeared the person or persons whose name(s) are subscribed to the above and foregoing Agreement for Final Payment and Contractor's Sworn Release,who each, after being by me duly sworn, on their oaths deposed and said: I(We) am(are) the person(s) who signed and executed the above and foregoing Agreement for Final Payment and Contractor's Sworn Release, and I (we)have read the facts and statements as therein set out and the representations as made therein, and I(we) state that the above and foregoing are true and correct. CONTRACTOR-Affiant SWORN TO AND SUBSCRIBED TO before me,the day of 20_. Notary Public, State of Texas My Commission Expires: [This form is for use in the event CONTRACTOR is a corporation.] 07/2006 00700-B3 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT AFFIDAVIT STATE OF TEXAS § COUNTY OF § BEFORE ME, the undersigned authority, on this day personally appeared the persons who signed and executed the above and foregoing Agreement for Final Payment mid Contractor's Sworn Release, whose names are set out above,who each, after being by me duly sworn, on their oaths deposed and said: We each are the persons whose names are subscribed above, and hold respectively the offices in the corporation as set out above, and each state under oath that we have the authority to execute this Agreement for Final Payment and Contractor's Sworn Release for and on behalf of said corporation,pursuant to authority granted to us in the Charter of said corporation,the By-Laws of said corporation and/or the Minutes of said corporation; and the facts, statements and representations as set out in the instrument to which this Affidavit is attached,are true and correct. SWORN TO AND SUBSCRIBED TO before me this,the day of 20 Notary Public, State of Texas My Commission Expires: 07/2006 00700-B4 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Cul \ ATTACHMENT NO.3 TO GENERAL CONDITIONS OWNER'S INSURANCE REQUIREMENTS OF CONTRACTOR 1. Definitions. For purposes of this Agreement: 1.1 Owner Parties. "Owner.Parties"means (a) the City of Pearland, its successors and assigns, and the Engineer, (b) any officers, employees, or agents of such persons or entities, and(c) others as required by the Contract Documents, if any. 1.2 Contractor. "Contractor" shall mean the vendor providing the service or work to be performed under this Agreement. 1.3 Subcontractor. "Subcontractor" shall include subcontractors of any tier. 1.4 ISO. "ISO"means Insurance Services Office. 2. Contractor Insurance Representations to Owner Parties 2.1 It is expressly understood and agreed that the insurance coverages required herein: 2.1.1 represent Owner Parties' minimum requirements and are not to be construed to void or limit the Contractor's indemnity obligations as contained in (111 , this Agreement nor represent in any manner a determination of the insurance coverages the Contractor should or should not maintain for its own protection; and 2.1.2 are being, or have been, obtained by the Contractor in support of the Contractor's liability and indemnity obligations under this Agreement. Neither the requirements as to insurance to be carried as provided for herein, the insolvency, bankruptcy or failure of any insurance company carrying insurance of the Contractor, nor the failure of any insurance company to pay claims accruing, shall be held to affect,negate or waive any of the provisions of this Agreement. 2.2 Failure to obtain and maintain the required insurance shall constitute a material breach of, and default under, this Agreement. If the Contractor shall fail to remedy such breach within five (5) business days after notice by the Owner, the Contractor will be liable for any and all costs, liabilities, damages and penalties resulting to the Owner Parties from such breach, unless a written waiver of the specific insurance requirement(s) is provided to the Contractor by the Owner. In the event of any failure by the Contractor to comply with the provisions of this Agreement, the Owner may, without in any way compromising or waiving any right or remedy at law or in equity, on notice to the Contractor, purchase such insurance, at the Contractor's expense, provided that the Owner shall have no obligation to do so and if the Owner shall do so, the Contractor shall not be relieved of or excused from the obligation to obtain and maintain such insurance amounts and coverages. 10-2012 00700-Cl CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT n 3. Conditions Affecting All Insurance Required Herein 3.1 Cost of Insurance. All insurance coverage shall be provided at the Contractor's sole expense. 3.2 Status and Rating of Insurance Company. All insurance coverage shall be written through insurance companies authorized to do business in the state in which the work is to be performed and rated no less than A-: VII in the most current edition of A. M. Best's Key Rating Guide. 3.3 Restrictive, Limiting, or Exclusionary Endorsements. All insurance coverage shall be provided to the Owner Parties in compliance with the requirements herein and shall contain no endorsements that restrict, limit, or exclude coverage required herein in any manner without the prior express written approval of the Owner. 3.4 Limits of Liability. The limits of liability may be provided by a single policy of insurance or by a combination of primary and umbrella policies, but in no event shall the total limits of liability available for any one occurrence or accident be less than the amount required herein. 3.5 Notice of Cancellation, Nonrenewal, or Material Reduction in Coverage. All insurance coverage shall contain the following express provision: In the event of cancellation, non-renewal, or material reduction in coverage affecting the certificate holder, thirty (30) days prior written notice shall be given to the certificate holder by certified mail or registered mail,return receipt requested. 3.6 Waiver of Subrogation. The Contractor hereby agrees to waive its rights of recovery from the Owner Parties with regard to all causes of property and/or liability loss and shall cause a waiver of subrogation endorsement to be provided in favor of the Owner Parties on all insurance coverage carried by the Contractor, whether required herein or not. 3.7 Deductible/Retention. Except as otherwise specified herein, no insurance required herein shall contain a deductible or self-insured retention in excess of $25,000 without prior written approval of the Owner. All deductibles and/or retentions shall be paid by, assumed by, for the account of, and at the Contractor's sole risk. The Contractor shall not be reimbursed for same. 4. Maintenance of Insurance. The following insurance shall be maintained in effect with limits not less than those set forth below at all times during the term of this Agreement and thereafter as required: 10-2012 00700-C2 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.1 Commercial General Liability Insurance 4.1.1 Coverage. Such insurance shall cover liability arising out of all locations and operations of the Contractor, including but not limited to liability assumed under this contract (including the tort liability of another assumed in a business contract). Defense shall be provided as an additional benefit and not included within the limit of liability. 4.1.2 Form. Commercial General Liability Occurrence form (at least as broad as an unmodified ISO CG 0001 0798 or its equivalent). 4.1.3 Amount of Insurance. Coverage shall be provided with limits of not less than: Each Occurrence Limit $1,000,000 General Aggregate Limit $2,000,000 Product-Completed Operations Aggregate Limit $2,000,000 Personal and Advertising Injury Limit $1,000,000 4.1.4 Required Endorsements a. Additional Insured. Additional insured status shall be provided in favor of the Owner Parties on any of the following: ("1"\, i. ISO form CG 20 10 11 85; or ii. ISO form CG 20 26 11 85; or iii. a combination of ISO forms CG 20 33 10 01 and CG 20 37 10 01; or iv. any form providing equivalent protection to Owner. b. Designated Construction Project(s) Aggregate Limit. The aggregate limit shall apply separately to this Agreement through use of an ISO CG 25 03 03 97 endorsement or its equivalent. c. Notice of Cancellation, Nonrenewal or Material Reduction in Coverage, as required in 3.5, above. d. Personal Injury Liability. The personal injury contractual liability exclusion shall be deleted. e.' Primary and Non-Contributing Liability. It is the intent of the parties to this Agreement that all insurance required herein shall be primary to all insurance available to the Owner Parties. The obligations of the Contractor's insurance shall not be affected by any other insurance available to the Owner Parties and shall seek no contribution from the Owner Parties' insurance, whether primary, excess contingent, or on any other basis. The Contractor's insurance coverage shall be endorsed to provide such primary and non- contributing liability. f. Waiver of Subrogation, as required in 3.6, above. 10-2012 00700-C3 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.1.5 Continuing Commercial General Liability Insurance. The Contractor shall maintain such insurance in identical coverage, form and amount, including required endorsements, for at least one (1) year following Date of Substantial Completion of the Work to be performed under this Agreement. The Contractor shall provide written representation to Owner stating Work completion date. 4.2 Auto Liability Insurance 4.2.1 Coverage. Such insurance shall cover liability arising out of any auto (including owned,hired, and non-owned). 4.2.2 Form. Business Auto form (at least as broad as an unmodified ISO CA 0001 or its equivalent). 4.2.3 Amount of Insurance. Coverage shall be provided with a limit of not less than$1,000,000. 4.2.4 Required Endorsements a. Notice of Cancellation, Nonrenewal or Material Reduction in Coverage, as required in 3.5, above. b. Waiver of Subrogation, as required in 3.6, above. 4.3 Employer's Liability Insurance 4.3.1 Coverage. Employer's Liability Insurance shall be provided as follows: 4.3.2 Amount of Insurance. Coverage shall be provided with a limit of not less than: Employer's Liability: $1,000,000 each accident and each disease. 4.3.3 Required Endorsements a. Notice of Cancellation, Nonrenewal or Material Reduction in Coverage, as required in 3.5, above. b. Waiver of Subrogation, as required in 3.6, above. 4.4 Umbrella Liability Insurance 4.4.1 Coverage. Such insurance shall be excess over and be no less broad than all coverages described above and shall include a drop-down provision for exhaustion of underlying limits. 4.4.2 Form. This policy shall have the same inception and expiration dates as the commercial general liability insurance required above. 10-2012 00700-C4 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.4.3 Amount of Insurance. Coverage shall be provided with a limit of not less than$5,000,000. 4.4.4 Continuing Umbrella Liability Insurance. The Contractor shall maintain such insurance in identical coverage, form and amount, including required endorsements, for at least one (1) year following Date of Substantial Completion of the Work to be performed under this Agreement. The Contractor shall provide written representation to the Owner stating Work completion date. 4.5 Professional Liability Insurance 4.5.1 Coverage. The Contractor shall provide professional liability insurance for any professional design or engineering drawing required by the work. Such insurance shall indemnify the Owner from— claims arising from the negligent performance of professional services of any type, including but not limited to design or design/build services as part of the Work to be performed. 4.5.2 Form. This insurance shall include prior acts coverage sufficient to cover all services rendered by the Contractor and by its consultants under this Agreement. It is recognized that this coverage may be provided on a Claims-Made basis. C1.6\ 4.5.3 Amount of Insurance. Coverage shall be provided with a limit of not less than$1,000,000. 4.5.4 Continuing Professional Liability Insurance. The Contractor shall maintain such insurance in identical coverage, form and amount for at least one (1) year following Date of Substantial Completion of the Work to be performed under this Agreement. The Contractor shall provide written representation to the Owner stating Work completion date. 4.6 Builder's Risk 4.6.1 Insureds. Insureds shall include: a. Owner, General Contactor and all Loss Payees and Mortgagees as Named Insureds; and b. subcontractors of all tiers in the Work as Additional Insureds. CIII6.‘• 10-2012 00700-CS CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.6.2 Covered Property. Such insurance shall cover: a. all structure(s) under construction, including retaining walls, paved surfaces and roadways, bridges, glass, foundation(s), footings, underground pipes and wiring, excavations, grading, backfilling or filling; b. all temporary structures (e.g., fencing, scaffolding, cribbing, false work, forms, site lighting, temporary utilities and buildings) located at the site; c. all property including materials and supplies on site for installation; d. all property including materials and supplies at other locations but intended for use at the site; e. all property including materials and supplies in transit to the site for installation by all means of transportation other than ocean transit; and f. other Work at the site identified in the Agreement to which this Exhibit is attached. Form a. Coverage shall be at least as broad as an unmodified ISO Special ') form, shall be provided on a completed-value basis, and shall be primary to any other coverage insurance available to the insured parties, with that other insurance being excess, secondary and non- contributing. b. No protective safeguard warranty shall be permitted. c. Required coverage shall further include: i. Additional expenses due to delay in $ TBD completion of project(where applicable) ii. Agreed value Included without sublimit iii. Damage arising from error, omission or Included without sublimit deficiency in construction methods, design, specifications,workmanship or materials,including collapse iv. Debris removal additional limit 25% of direct damage loss v. Earthquake(where applicable) $TBD vi. Earthquake sprinkler leakage(where $ TBD applicable) vii. Expediting expenses $ TBD viii. Flood(where applicable) $ TBD ix. Freezing Included without sublimit x. Mechanical breakdown, including hot& Included without sublimit cold testing(where applicable) 10-2012 00700-C6 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Calk') xi. Notice of cancellation,non-renewal or Included material reduction—60 days prior written notice to each insured xii. Occupancy clause, as required in F, Included below xiii. Ordinance or law Included without sublimit xiv. Pollutant clean-up and removal $ TBD xv. Preservation of property Included without sublimit xvi. Replacement cost Included xvii. Theft Included without sublimit xviii. Waiver of subrogation as required in G, Included below. 4.6.3 Amount of Insurance. Coverage shall be provided in an amount equal at all times to the full replacement value and cost of debris removal for any single occurrence. 4.6.4 Deductibles. Deductibles shall not exceed the following: a. All Risks of Direct Damage,Per $5,000 Occurrence, except b. Delayed Opening Waiting Period 5 Days c. Flood,Per Occurrence $25,000 or excess of NFIP if in Flood Zone A, BorV d. Earthquake and Earthquake Sprinkler $25,000 Leakage, Per Occurrence 4.6.5 Termination of Coverage. The termination of coverage provision shall be endorsed to permit occupancy of the covered property being constructed so long as such occupancy does not exceed 20% of the usable area of the property. This insurance shall be maintained in effect, unless otherwise provided for in the Contract Documents, until the earliest of the following dates: a. the date on which all persons and organizations who are insureds under the policy agree that it shall be terminated; b. the date on which fmal payment, as provided for in the Agreement to which this Exhibit is attached,has been made; or c. the date on which the insurable interests in the Covered Property of all insureds other than Contractor have ceased. 10-2012 00700-C7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.6.6 Waiver of Subrogation. The waiver of subrogation provision shall be endorsed as follows: a. A waiver of subrogation shall be provided in favor of all insureds. b. The waiver of subrogation provisions shall be endorsed as follows: Should a covered loss be subrogated, either in whole or in part, your rights to any recovery will come first, and we will be entitled to a recovery only after you have been fully compensated for the loss. 5. Intentionally left blank. 6. Evidence of Insurance 6.1 Provision of Evidence. Evidence of the insurance coverage required to be maintained by the Contractor, represented by certificates of insurance, evidence of insurance, and endorsements issued by the insurance company or its legal agent, and must be furnished to the Owner prior to commencement of Work and not later than fifteen (15) days after receipt of this Agreement. New certificates of insurance, evidence of insurance, and endorsements shall be provided to the Owner prior to the termination date of the current certificates of insurance, evidence of insurance, and endorsements. 6.2 Form 6.2.1 All property insurance required herein shall be evidenced by ACORD form 28, "Evidence of Property Insurance". 6.2.2 All liability insurance required herein shall be evidenced by ACORD form 25, "Certificate of Insurance". 6.3 Specifications. Such certificates of insurance, evidence of insurance, and endorsements shall specify: 6.3.1 The Owner as a certificate holder with correct mailing address. 6.3.2 Insured's name, which must match that on this Agreement. 6.3.3 Insurance companies affording each coverage, policy number of each coverage, policy dates of each coverage, all coverages and limits described herein, and signature of authorized representative of insurance company. 6.3.4 Producer of the certificate with correct address and phone number listed. 6.3.5 Additional insured status required herein. 6.3.6 Amount of any deductibles and/or retentions. 6.3.7 Cancellation, non-renewal and material reduction in coverage notification as required by this Agreement. Additionally, the words "endeavor to" and "but failure to mail such notice shall impose no obligation or liability of any 10-2012 00700-C8 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT kind upon Company, it agents or representatives" shall be deleted from the cancellation provision of the ACORD 25 certificate of insurance form. 6.3.8 Designated Construction Project Aggregate Limits required herein. 6.3.9 Personal Injury contractual liability required herein. 6.3.10 Primary and non-contributing status required herein. 6.3.11 Waivers of subrogation required herein. 6.4 Required Endorsements. A copy of each of the required endorsements shall also be provided. 6.5 Failure to Obtain. Failure of any Owner Party to demand such certificate or other evidence of full compliance with these insurance requirements or failure of any Owner Party to identify a deficiency from evidence that is provided shall not be construed as a waiver of the Contractor's obligation to maintain such insurance. 6.6 Certified Copies. Upon request of any Owner Party, the Contractor shall provide to the Owner a certified copy of all insurance policies required herein within ten (10) days of any such request. Renewal policies, if necessary, shall be delivered to the Owner prior to the expiration of the previous policy. 6.7 Commencement of Work. Commencement of Work without provision of the required certificate of insurance, evidence of insurance and/or required endorsements, or without compliance with any other provision of this Agreement, shall not constitute a waiver by any Owner Party of any rights. The Owner shall have the right, but not the obligation, of prohibiting the Contractor or any subcontractor from performing any Work until such certificate of insurance, evidence of insurance and/or required endorsements are received and approved by the Owner. 7. Insurance Requirements of Contractor's Subcontractors 7.1 Insurance similar to that required of the Contractor shall be provided by all subcontractors (or provided by the Contractor on behalf of subcontractors) to cover operations performed under any subcontract agreement. The Contractor shall be held responsible for any modification in these insurance requirements as they apply to subcontractors. The Contractor shall maintain certificates of insurance from all subcontractors containing provisions similar to those listed herein (modified to recognize that the certificate is from subcontractor) enumerating, among other things, the waivers of subrogation, additional insured status, and primary liability as required herein, and make them available to the Owner upon request. 7.2 The Contractor is fully responsible for loss and damage to its property on the site, including tools and equipment, and shall take necessary precautions to prevent damage to or vandalism, theft, burglary, pilferage and unexplained disappearance of property. Any insurance covering the Contractor's or its subcontractor's property shall be the Contractor's and its subcontractor's sole and complete means or recovery for any such loss. To the extent any loss is not covered by said insurance or subject to any deductible or co-insurance, the Contractor shall not be reimbursed for same. Should the Contractor or its subcontractors choose to self insure this risk, 10-2012 00700-C9 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT it is expressly agreed that the Contractor hereby waives, and shall cause its subcontractors to waive, any claim for damage or loss to said property in favor of the Owner Parties. 8. Use of the Owner's Equipment. The Contractor, its agents, employees, subcontractors or suppliers shall use the Owner's equipment only with express written permission of the Owner's designated representative and in accordance with the Owner's terms and condition for such use. If the Contractor or any of its agents, employees, subcontractors or suppliers utilize any of the Owner's equipment for any purpose, including machinery, tools, scaffolding, hoists, lifts or similar items owned, leased or under the control of the Owner, the Contractor shall defend, indemnify and be liable to the Owner Parties for any and all loss or damage which may arise from such use. 9. Release and Waiver. The Contractor hereby releases, and shall cause its subcontractors to release, the Owner Parties from any and all claims or causes of action whatsoever which the Contractor and/or its subcontractors might otherwise now or hereafter possess resulting in or from or in any way connected with any loss covered by insurance, whether required herein or not, or which should have been covered by insurance required herein, including the deductible and/or uninsured portion thereof, maintained and/or required to be maintained by the Contractor and/or its subcontractors pursuant to this Agreement. 10-2012 00700-C10 ACCORD ANCE U CERTIFICATE OF LIABILITY INS R ° D"YYY' � 5/9/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS I CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES 117BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED `. REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. if SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Liz Comiskey Comiskey Capital Insurance PHONE (409)935-0086 FAX LAIC.No.Extl: (A/C,Not:(409)935-4000 401 Tiki Drive nooRess:liz@comiskeycapitalinsurance.com INSURER(S)AFFORDING COVERAGE NAIC# Tiki Island TX 77554 INSURERA:Kinsale Insurance Company 38920 INSURED INSURER B:Hanover Insurance Company 22292 General Contractor Services, Inc. INSURER C:Torus Specialty Insurance 44776 8400 LaPorte Road INSURER D:Texas Mutual Ins 22945 INSURER E: . _ Houston TX 77 012 INSURER F: COVERAGES CERTIFICATE NUMBER:CL126501292 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUER POLICY EFF POLICY EXP INSR WVD POLICY NUMBER (MMIDD/YYYY) (MMIDDIYYYY) LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGES RENTED PREMISES(( 10000Ea occurrence) $ r 0 A CLAIMS-MADE X OCCUR X 0100000910-2 10/29/2012 10/29/2013 MEDEXP(Anyoneperson) $ Excluded PERSONAL BADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEI fL AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 X 1 POLICY n JEa [1 LOC Deductible $ 2,500 AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT (Ea accident) S 1,000,000 ®_ , X I ANY AUTO BODILY INJURY(Per person) $ ALL OWNED X SCHEDULED X AWD-4369513-04 10/29/2012 10/29/2013 BODILYINJURY(Peraccident $ AUTOS _ AUTOS ) _ X HIRED AUTOS X NON-OWNED PROPERTY DAMAGE $ _ AUTOS (Per accident) $ / UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 5,000,000 C X EXCESS LIAB CLAIMS-MADE AGGREGATE $ 5,000,000 DED RETENTION$ 43643A111ALi 10/29/2012 10/29/2013 $ D WORKERS COMPENSATION X WC STATU- TORY EMPLOYERS'LIABILITY Y/N • TORY LIMITS ER ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? N/A (Mandatory in NH) TSF-0001137904 10/21/2012 10/21/2013 E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 B Inland Marine MID 4362226 04 10/29/2012 10/29/2013 Total Coverage 180,000 Contractors Equipment Deductible 1,000 DESCRIPTION OF OPERATIONS 1 LOCATIONS I VEHICLES(Attach ACORD 101,Additional Remarks Schedule,if more space Is required) Certificate holder is shown as additional insured CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Pearland ACCORDANCE WITH THE POLICY PROVISIONS. Patty Patke, Projects Department AUTHORIZED REPRESENTATIVE 3519 Liberty Drive Pearland, TX 77581 Liz Comiskey/LIZCO1 11. $ -- — ACORD 25(2010/05) ©1988-2010 ACORD CORPORATION. All rights reserved. INS025(201005).01 The ACORD name and logo are registered marks of ACORD CITY OFPEARLAND SPECIAL CONDITIONS OF AGREEMENT Section 00800 SPECIAL CONDITIONS OF AGREEMENT The following Special Conditions modify the General Conditions,Document 00700. Where a portion of the General Conditions is modified or deleted by these Special Conditions, the unaltered portions of the General Conditions shall remain in effect. ARTICLE 1 DEFINITIONS AND INTERPRETATIONS 1.01 Add the following paragraph to the end of Article 1.01: The OWNER'S representative on the project site is: Cuong Le; Telephone: (281) 652-1682 The CONSTRUCTION MANAGER is: telephone: The CONSTRUCTION INSPECTOR is: telephone: ARTICLE 4 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR 4.05 Add the following paragraph to Article 4.05: A Maintenance Bond in accordance with Document 00612 of the Project Manual is required for this Project. The cost of this bond shall be included in the CONTRACTOR'S Bid Proposal. Attachment No. 3 To General Conditions, Owner's Insurance Requirements of Contractor, Article 4.6 Builder's Risk—Builder's Risk Insurance is Not Required for this project. ARTICLE 5 PROSECUTION AND PROGRESS 5.08 Add Article 5.08: The Contract Time as defined in the bid and other sections of the Contract Documents includes a certain number of rain days. Based on the Alvin Weather Center Records, the average annual rain days from June 1898 to December 1996 is 40 days calculated from all precipitation days of record. The CONTRACTOR is required to keep a record of rain days at the site. The record of rain days must be accepted and signed by the City Inspector monthly, and shall be reported on the monthly pay estimate submittal. At the end of the contract,the CONTRACTOR will be credited only for the number of accepted rain days that exceed 40 rain days per year,proportionate to the original Contract Time. 2-24-12 00800- 1 of 2 CITY OF PEARLAND SPECIAL CONDITIONS OF AGREEMENT General Notes: TABLE OF CONTENTS—All TxDOT items shown in Table of Contents is part of this contract. Sections 00100 Invitation to Bidders,00200 Instructions to Bidders and 01505 Mobilization all make reference to provision by the CONTRACTOR of a laptop computer for use by the OWNER'S representative or CONSTRUCTION MANAGER. BIDDER is Not Required to provide this equipment or include this cost in the Bid. See Section 13730 for full details regarding this computer equipment. Section 01200 Measurement and Payment Procedures Measurement and Payment methods delineated in individual Specification sections are intended to complement the criteria of Section 01200—Measurement and Payment Procedures. In the event of conflict, the requirements of Section 01200-Measurement and Payment Procedures shall govern. This is a lump sum bid project. The bidders are made aware that the quantities shown on the bid form are estimated quantities. The quantities included in the bid form are approximate and may increase or decrease. No additional payment will be made for any overruns in estimated quantities shown on the bid form. Extra work bid items included in the bid form cannot be utilized for any overruns in quantities. The bidders are responsible for visiting the project site and reviewing the plan drawings and obtaining an accurate estimate of the work and associated quantities involved prior to bidding. Approximate quantities have been included in the Extra Work Pay Items. These items will only be utilized after obtaining prior approval from the City and the Engineer. Section 01500 Temporary Facilities requires CONTRACTOR to provide high speed internet n access in the Field Office. BIDDER is Not Required to provide either a Field Office or any internet access for this project. All other requirements remain and will be required per the section. Contractor Will Not be required to provide an on-site construction office for the duration of this project. It is the responsibility of the Contractor to coordinate with Tx Dot to obtain a Traffic Control permit and to notify the City at least 72-hours prior to any lane closures. The Contractor is to keep a minimum of one lane open at all times, in both directions.No lane closures to extend beyond the defined work day. It is the Contractor's responsibility to coordinate their work with all work done by others as indicated on the plans. Section 00800a Contractor Requirements—Contractor to follow all requirements in this section. • It is the responsibility of the Contractor to coordinate with BNSF Railway when working within their R.O.W. as defined in section 800a 1.05. This work is considered incidental to the pertinent bid item. Section 00800b Agreement between BNSF Railway and Contractor—Contractor to follow and complete all requirements in this section. The Contractor must execute the BNSF contract and provide the City with a copy prior to starting any work. END OF SECTION 2-24-12 00800-2 of 2 • Section 00800a EXHIBIT "C" CONTRACTOR REQUIREMENTS 1.01 General: • 1.01.01 The Contractor must cooperate with BNSF RAILWAY COMPANY, hereinafter referred to as "Railway" where work is over or under on or adjacent to Railway property and/or right-of-way, hereafter referred to as "Railway Property", during the construction of new raised center medians on Broadway Street/FM 518 (DOT No. 023204B) at railroad milepost 9.00 in Pearland. Texas in accordance with the City of Pearland's plans (Exhibit "A" dated Aucwst 2012). • 1.01.02 The Contractor must execute and deliver to the Railway duplicate copies of the Exhibit"C-1"Agreement, in the form attached hereto, obligating the Contractor to provide and maintain in full force and effect the insurance called for under Section 3 of said Exhibit "C-1". Questions regarding procurement of the Railroad Protective Liability Insurance should be directed to Rosa Martinez at Marsh, USA, 214-303- 8519. • 1.01.03 The Contractor must plan, schedule and conduct all work activities so as not to interfere with the movement of any trains on Railway Property. • 1.01.04 The Contractor's right to enter Railway's Property is subject to the absolute right of Railway to cause the Contractor's work on Railway's Property to cease if, in the opinion of Railway, Contractor's activities create a hazard to Railway's Property, employees, and/or operations. Railway will have the right to stop construction work on the Project if any of the following events take place: (i) • Contractor (or any of its subcontractors) performs the Project work in a manner contrary to the plans and specifications approved by Railway; (ii) Contractor (or any of its subcontractors), in Railway's opinion, prosecutes the Project work in a manner which is hazardous to Railway property, facilities or the safe and expeditious movement of railroad traffic; (iii) the insurance described in the attached Exhibit C-1 is canceled during the course of the Project; or (iv) Contractor fails to pay Railway for the Temporary Construction License or the Easement. The work stoppage will continue until all necessary actions are taken by Contractor or its subcontractor to rectify the situation to the satisfaction of Railway's Division Engineer or until additional insurance has been delivered to and accepted by Railway. In the event of a breach of (i) this Agreement, (ii) the Temporary Construction License, or (iii) the Easement, Railway may immediately terminate the Temporary Construction License or the Easement. Any such work stoppage under this provision will not give rise to any liability on the part of Railway. Railway's right to stop the work is in addition to any other.rights Railway may have including, but not limited to, actions or suits for Cliab\ FM 518 median construction—Exhibit C(revised 10-30-12) 1 rTh damages or lost profits. In the event that Railway desires to stop construction work on the Project, Railway agrees to immediately notify the following individual in writing: Skipper Jones, MPM, CIPM Assistant Director, Projects Department City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Phone: 281-652-1748 Email: sjones@ci.pearland.tx.us • 1.01.05 The Contractor is responsible for determining and complying with all Federal, State and Local Governmental laws and regulations, including, but not limited to environmental laws and regulations (including but not limited to the Resource Conservation and Recovery Act, as amended; the Clean Water Act, the Oil Pollution Act, the Hazardous Materials Transportation Act, CERCLA), and health and safety laws and regulations. The Contractor hereby indemnifies, defends and holds harmless Railway for, from and against all fines or penalties imposed or assessed by Federal, State and Local Governmental Agencies against the Railway which arise out of Contractor's work under this Agreement. • 1.01.06 The Contractor must notify City of Pearland (Skipper Jones) at 281- 652-1748 and Railway's Manager Public Projects, telephone number 817-352-2902 at least thirty (30) calendar days before commencing any work on Railway Property. Contractor's notification to Railway must refer to Railway's file 023204B. • 1.01.07 . For any bridge demolition and/or falsework above any tracks or any excavations located with any part of the excavations located within, whichever is greater, twenty-five (25) feet of the nearest track or intersecting a slope from the plane of the top of rail on a 2 horizontal to 1 vertical slope beginning at eleven (11) feet from centerline of the nearest track, both measured perpendicular to center line of track, the Contractor must furnish the Railway five sets of working drawings • showing details of construction affecting Railway Property and tracks. The working drawing must include the proposed method of installation and removal of falsework, shoring or cribbing, not included in the contract plans and two sets of structural calculations of any falsework, shoring or cribbing. For all excavation and shoring submittal plans, the current "BNSF-UPRR Guidelines for Temporary Shoring" must be used for determining the design loading conditions to be used in shoring design, and all calculations and submittals must be in accordance with the current "BNSF- UPRR Guidelines for Temporary Shoring". All submittal drawings and calculations must be stamped by a registered professional engineer licensed to practice in the state the project is located. All calculations must take into consideration railway surcharge loading and must be designed to meet American Railway Engineering and Maintenance-of-Way Association (previously known as American Railway Engineering Association) Coopers E-80 live loading standard. All drawings and FM 518 median construction—Exhibit C(revised 10-30-12) 2 • calculations must be stamped by a registered professional engineer licensed to practice in the state the project is located. The Contractor must not begin work until notified by the Railway that plans have been approved. The Contractor will be required to use lifting devices such as, cranes and/or winches to place or to remove any falsework over Railway's tracks. In no case will the Contractor be relieved of responsibility for results obtained by the implementation of said approved plans. • 1.01.08 Subject to the movement of Railway's trains, Railway will cooperate with the Contractor such that the work may be handled and performed in an efficient manner. The Contractor will have no claim whatsoever for any type of damages or for extra or additional compensation in the event his work is delayed by the Railway. 1.02 Contractor Safety Orientation • 1.02.01 No employee of the Contractor, its subcontractors, agents or invitees may enter Railway Property without first having completed Railway's Engineering Contractor Safety Orientation, found on the web site www.contractororientation.com. The Contractor must ensure that each of its employees, subcontractors, agents or invitees completes Railway's Engineering Contractor Safety Orientation through Internet sessions before any work is performed on the Project. Additionally, the Contractor must ensure that each and every one of its employees, subcontractors, agents or invitees possesses a card certifying completion of the Railway Contractor Safety Orientation before entering Railway Property. The Contractor is responsible for the cost of the Railway Contractor Safety Orientation. The Contractor must renew the Railway Contractor Safety Orientation annually. Further clarification can be found on the web site or from the Railway's Representative. 1.03 Railway Requirements • 1.03.01 The Contractor must take protective measures as are necessary to keep railway facilities, including track ballast, free of sand, debris, and other foreign objects and materials resulting from his operations. Any damage to railway facilities resulting from Contractor's operations will be repaired or replaced by Railway and the cost of such repairs or replacement must be paid for by the Agency. • 1.03.02 The Contractor must notify the Railway's Division General Manager Steven Curtriqht at (281) 350-7781 and provide blasting plans to the Railway for review seven (7) calendar days prior to conducting any blasting operations adjacent to or on Railway's Property. • 1.03.03 The Contractor must abide by the following temporary clearances during construction: (�`, FM 518 median construction—Exhibit C(revised 10-30-12) 3 • 15'-0" Horizontally from centerline of nearest track • 21'-6" Vertically above top of rail • 27'-0" Vertically above top of rail for electric wires carrying less than 750 volts • 28'-0" Vertically, above top of rail for electric wires carrying 750 volts to 15,000 volts • 30'-0" Vertically above top of rail for electric wires carrying 15,000 volts to 20,000 volts • 34'-0" Vertically above top of rail for electric wires carrying more than 20,000 volts • 1.03.04 Upon completion of construction, the following clearances shall be maintained: • 25' Horizontally from centerline of nearest track • 23' 6" Vertically above top of rail • • 1.03.05 Any infringement within State statutory clearances due to the Contractor's operations must be submitted to the Railway and to the City of Pearland and must not be undertaken until approved in writing by the Railway, and until the City of Pearland has obtained any necessary authorization from the State Regulatory Authority for the infringement. No extra compensation will be allowed in the event the Contractor's work is delayed pending Railway approval, and/or the State Regulatory Authority's approval. • 1.03.06 In the case of impaired vertical clearance above lop of rail, Railway will have the option of installing tell-tales or other protective devices Railway deems necessary for protection of Railway operations. The cost of tell-tales or protective devices will be borne by the Agency. • 1.03.07 The details of construction affecting the Railway's Property and tracks not included in the contract plans must be submitted to the Railway by City of Pearland for approval before work is undertaken and this work must not be undertaken until approved by the Railway. • 1.03.08 At other than public road crossings, the Contractor must not move any equipment or materials across Railway's tracks until permission has been obtained from the Railway. The Contractor must obtain a "Temporary. Construction Crossing Agreement" from the Railway prior to moving his equipment or materials across the Railways tracks. The temporary crossing must be gated and locked at all times when not required for use by the Contractor. The temporary crossing for use of the Contractor will be constructed and, at the completion of the project, removed at the expense of the Contractor. • 1.03.09 Discharge, release or spill on the Railway Property of any hazardous substances, oil, petroleum, constituents, pollutants, contaminants, or any hazardous FM 518 median construction—Exhibit C(revised 10-30-12) 4 7\' waste is prohibited and Contractor must immediately notify the Railwav's Resource Operations Center at 1(800) 832-5452, of any discharge, release or spills in excess of a reportable quantity. Contractor must not allow Railway Property to become a treatment, storage or transfer facility as those terms are defined in the Resource Conservation and Recovery Act or any state analogue. • 1.03.10 The Contractor upon completion of the work covered by this contract, must promptly remove from the Railway's Property all of Contractor's tools, equipment, implements and other materials, whether brought upon said.property by said Contractor or any Subcontractor, employee or agent of Contractor or of any Subcontractor, and must cause Railway's Property to be left in a condition acceptable to the Railway's representative. 1.04 Contractor Roadway Worker on Track Safety Program and Safety Action Plan: • 1.04.01 Each Contractor that will perform work within 25 feet of the centerline of a track must develop and implement a Roadway Worker Protection/On Track Safety Program and work with Railway Project Representative to develop an on track safety strategy as described in the guidelines listed in the on track safety portion of the Safety Orientation. This Program must provide Roadway Worker protection/on track (1.6.\ training for all employees of the Contractor, its subcontractors, agents or invitees. This training is reinforced at the job site through job safety briefings. Additionally, each Contractor must develop and implement the Safety Action Plan, as provided for on the web site www.contractororientation.com, which will be made available to Railway prior to commencement of any work on Railway Property. During the performance of work, the Contractor must audit its work activities.'The Contractor must designate an on-site Project Supervisor who will serve as the contact person for the Railway and who will maintain a copy of the Safety Action Plan, safety audits, and Material Safety Datasheets (MSDS), at the job site. 1.05 Railway Flagger Services: • 1.05.01 The Contractor must give Railway's Roadmaster (Patrick McAleesel at Office # 713-847-3176 or Cell # 281-785-0607 or e-mail patrick.mcaleeseMbnsf.com a minimum of thirty (30) calendar days advance notice when flagging services will be required so that the Roadmaster can make appropriate arrangements (i.e., bulletin the flagger's position). If flagging services are scheduled in advance by the Contractor and it is subsequently determined by the parties hereto that such services are no longer necessary, the Contractor must give the Roadmaster five (5) working days advance notice so that appropriate arrangements can be made to abolish the position pursuant to union requirements. • 1.05.02 Unless determined otherwise by Railway's Project Representative, FM 518 median construction—Exhibit C(revised 10-30-12) 5 td.) Railway flagger will be required and furnished when Contractor's work activities are located over, under and/or within twenty-five (25) feet measured horizontally from centerline of the nearest track and when cranes or similar equipment positioned beyond 25-feet from the track centerline could foul the track in the event of tip over or other catastrophic occurrence, but not limited thereto for the following conditions: • 1.05.02a When, upon inspection by Railway's Representative, other conditions warrant. • 1.05.02b When any excavation is performed below the bottom of tie elevation, if, in the opinion of Railway's representative, track or other Railway facilities may be subject to movement or settlement. • 1.05.02c When work in any way interferes with the safe operation of trains at timetable speeds. • 1.06.02d When any hazard is presented to Railway track, communications, signal, electrical, or other facilities either due to persons, material, equipment or blasting in the vicinity. • 1.05.02e Special permission must be obtained from the Railway before moving heavy or cumbersome objects or equipment which might result in making the track impassable. • 1.05.03 Flagging services will be performed by qualified Railway flaggers. • 1.05.03a Flagging crew generally consists of one employee. However, additional personnel may be required to protect Railway Property and operations, if deemed necessary by the Railways Representative. • 1.05.03b Each time a flagger is called, the minimum period for billing will be the - eight (8) hour basic day. • 1.05.03c The cost of flagger services provided by the Railway will be borne by the CONTRACTOR. The estimated cost for one (1) flagger is approximately between $800.00-$1,600.00 for an eight (8) hour basic day with time and one-half or double • time for overtime, rest days and holidays. The estimated cost for each flagger includes vacation allowance, paid holidays, Railway and unemployment insurance, public liability and property damage insurance, health and welfare benefits, vehicle, transportation, meals, lodging, radio, equipment, supervision and other costs incidental to performing flagging services. Negotiations for Railway labor or collective bargaining agreements and rate changes authorized by appropriate Federal authorities may increase actual or estimated flagging rates. THE FLAGGING RATE IN EFFECT AT THE TIME OF PERFORMANCE BY THE CONTRACTOR HEREUNDER WILL BE USED TO CALCULATE THE ACTUAL COSTS OF FLAGGING PURSUANT TO THIS PARAGRAPH. FM 518 median construction—Exhibit C(revised 10-30-12) 6 • • 1.05.03d The average train traffic on this route is 29 freight trains per 24-hour period at a timetable speed 55 MPH and 2 switching movements at 10 MPH. No passenger trains. 1.06 Contractor General Safety Requirements • 1.06.01 Work in the proximity of railway track(s) is potentially hazardous where movement of trains and equipment can occur at any time and in any direction. All work performed by contractors within 25 feet of any track must be in compliance with FRA Roadway Worker Protection Regulations. • 1.06.02 Before beginning any task on Railway Property, a thorough job safety briefing must be conducted with all personnel involved,with the task and repeated when the personnel or task changes. If the task is within 25 feet of any track, the job briefing must include the Railway's flagger, as applicable, and include the procedures the Contractor will use to protect its employees, subcontractors, agents or invitees from moving any equipment adjacent to or across any Railway track(s). • 1.06.03 Workers must not work within 25 feet of the centerline of any track without an on track safety strategy approved by the Railway's Project Representative. When authority is provided, every contractor employee must know: (1) who the Railway flagger is, and how to contact the flagger, (2) limits of the authority, (3) the method of communication to stop and resume work, and (4) location of the designated places of safety. Persons or equipment entering flag/work limits that were not previously job briefed, must notify the flagger immediately, and be given a job briefing when working within 25 feet of the center line of track. • 1.06.04 When Contractor employees are required to work on the Railway Property after normal working hours or on weekends, the Railway's representative in charge of the project must be notified. A minimum of two employees must be present at all times. • 1.06.05 Any employees, agents or invitees of Contractor or its subcontractors under suspicion of being under the influence of drugs or alcohol, or in the possession of same, will be removed from the Railway's Property and subsequently released to the custody of a representative of Contractor management. Future access to the Railway's Property by that employee will be denied. • 1.06.06 Any damage to Railway Property, or any hazard noticed on passing trains must be reported immediately to the Railway's representative in charge of the project. Any vehicle or machine which may come in contact with track, signal equipment, or structure (bridge) and could result in a train derailment must be reported immediately to the Railway representative in charge of the project and to the Railway's Resource Operations Center at 1(800) 832-5452. Local emergency FM 518 median construction—Exhibit C(revised 10-30-12) 7 numbers are to be obtained from the Railway representative in charge of the project prior to the start of any work and must be posted at the job site. • 1.06.07 For safety reasons, all persons are prohibited from having pocket knives, firearms or other deadly weapons in their possession while working on Railway's Property. • 1.06.08 All personnel protective equipment (PPE) used on Railway Property must • meet applicable OSHA and ANSI specifications. Current Railway personnel protective equipment requirements are listed on the web site, www.contractororientation.com, however, a partial list of the requirements include: a) safety glasses with permanently affixed side shields (no yellow lenses); b) hard hats; c) safety shoe with: hardened toes, above-the-ankle lace-up and a defined heel; and d) high visibility retro-reflective work wear. The Railway's representative in charge of the project is to be contacted regarding local specifications for meeting requirements relating to hi-visibility work wear. Hearing protection, fall protection, gloves, and respirators must be worn as required by State and Federal regulations. (NOTE — Should there be a discrepancy between the information contained on the web site and the information in this paragraph. the web site will govern.) • 1.06.09 THE CONTRACTOR MUST NOT PILE OR STORE ANY MATERIALS, MACHINERY OR EQUIPMENT CLOSER THAN 25'-0" TO THE CENTER LINE OF THE NEAREST RAILWAY TRACK. MATERIALS, MACHINERY OR EQUIPMENT MUST NOT BE STORED OR LEFT WITHIN 250 FEET OF ANY HIGHWAY/RAIL AT-GRADE CROSSINGS OR TEMPORARY CONSTRUCTION CROSSING, WHERE STORAGE OF THE SAME WILL OBSTRUCT THE VIEW OF A TRAIN APPROACHING THE CROSSING. PRIOR TO BEGINNING WORK, THE CONTRACTOR MUST ESTABLISH A STORAGE AREA WITH CONCURRENCE OF THE RAILWAY'S REPRESENTATIVE. • 1.06.10 Machines or vehicles must not be left unattended with the engine running. Parked machines or equipment must be in gear with brakes set and if equipped with blade, pan or bucket, they must be lowered to the ground. All machinery and equipment left unattended on Railway's Property must be left inoperable and secured against movement. (See internet Engineering Contractor Safety Orientation program for more detailed specifications) • 1.06.11 Workers must not create and leave any conditions at the work site that would interfere with water drainage. Any work performed over water must meet all Federal, State and Local regulations. • 1.06.12 All power line wires must be considered dangerous and of high voltage unless informed to the contrary by proper authority. For all power lines the minimum clearance between the lines and any part of the equipment or load must be; 200 KV or below - 15 feet; 200 to 350 KV - 20 feet; 350 to 500 KV - 25 feet; 500 to 750 FM 518 median construction—Exhibit C(revised 10-30-12) 8 r KV - 35 feet; and 750 to 1000 KV - 45 feet. If capacity of the line is not known, a minimum clearance of 45 feet must be maintained. A person must be designated to observe clearance of the equipment and give a timely warning for all operations where it is difficult for an operator to maintain the desired clearance by visual means. 1.07 Excavation: • 1.07.01 Before excavating, the Contractor must determine whether any underground pipe lines, electric wires, or cables, including fiber optic cable systems are present and located. within the Project work area. The Contractor must determine whether excavation on Railway's Property could cause damage to buried cables resulting in delay to Railway traffic and disruption of service to users. Delays and disruptions to service may cause business interruptions involving loss of revenue and profits. Before commencing excavation, the Contractor must contact BNSF's Roadmaster (Patrick McAleese) at 713-847-3176 and BNSF's Signal Construction Supervisor jDwavne Tiffin) at 817-740-7384. All underground and overhead wires will be considered HIGH VOLTAGE and dangerous until verified with the company having ownership of the line. It is the Contractor's responsibility to notify any other companies that have underground utilities in the area and arrange for the location of all underground utilities before excavating. • 1.07.02 The Contractor must cease all work and notify the Railway immediately before continuing excavation in the area if obstructions are encountered which do not appear on drawings. If the obstruction is a utility and the owner of the utility can be identified, then the Contractor must also notify the owner immediately. If there is any doubt about the location of underground cables or lines of any kind, no work must be performed until the exact location has been determined. There will be no exceptions to these instructions. • 1.07.03 All excavations must be conducted in compliance with applicable OSHA regulations and, regardless of depth, must be shored where there is any danger to tracks, structures or personnel. • 1.07.04 Any excavations, holes or trenches on the Railway's Property must be covered, guarded and/or protected when not being worked on. When leaving work site areas at night and over weekends, the areas must be secured and left in a condition that will ensure that Railway employees and other personnel who may be working or passing through the area are protected from all hazards. All excavations must be back filled as soon as possible. 1.08 Hazardous Waste, Substances and Material Reporting: • 1.08.01 If Contractor discovers any hazardous waste, hazardous substance, petroleum or other deleterious material, including but not limited to any FM 518 median construction-Exhibit C(revised 10-30-12) • 9 "-&) non-containerized commodity or material, on or adjacent to Railway's Property, in or near any surface water, swamp, wetlands or waterways, while performing any work under this Agreement, Contractor must immediately: (a) notify the Railway's Resource Operations Center at 1(800) 832-5452, of such discovery: (b) take safeguards necessary to protect its employees, subcontractors, agents and/or third parties: and (c) exercise due care with respect to the release, including the taking of any appropriate measure to minimize the impact of such release. 1.09 Personal Injury Reporting • 1.09.01 The Railway is required to report certain injuries as a part of compliance with Federal Railroad Administration (FRA) reporting requirements. Any personal injury sustained by an employee of the Contractor, subcontractor or Contractor's invitees while on the Railway's Property must be reported immediately (by phone mail if unable to contact in person) to the Railway's representative in charge of the project. The Non-Employee Personal Injury Data Collection Form contained herein. is to be completed and sent by Fax to the Railway at 1(817) 352-7595 and to the Railway's Project Representative no later than the close of shift on the date of the injury. • FM 518 median construction—Exhibit C(revised 10-30-12) 10 Rail ova r NON-EMPLOYEE PERSONAL INJURY DATA COLLECTION (If injuries are in connection with rail equipment accident/incident, highway rail grade crossing accident or automobile accident,ensure that appropriate information is obtained,farms completed and that data entry personnel are aware that injuries relate to that specific event.) Injured Person Type: • nPassenger on train (C) El Non-employee (N) (ie emp of another railroad or,non-BNSFempinvolved in vehicle accident including company vehicles) nContractor/safety sensitive (F) Contractor/non-safety sensitive (G) nVolunteer/safety sensitive (H) n Volunteer/other non-safety sensitive (I) nNon-trespasser (0)-to include highway users involved in highway rail grade crossing accidents who did not go around or through gates 716\ n Trespasser (E) - to include highway users involved in highway rail grade crossing accidents who went around or through gates nNon-trespasser(J)-Off railroad property If train involved,Train III: Transmit attached information to Accident/Incident Reporting Center by: Fax 1-817-352-7595 or by Phone 1-800-097-9739 or email to: Accident-Reporting.CenterlBNSF.com AND COPY TO:RDADMASTER FAX 281-331-2070 B RAILWAY MANAGER PUBLIC PROJECTS FAX 817-352-2912 Officer Providing Information: (Name) (Employee No.) (Phone#) REPORT PREPARED TO COMPLY WITH FEDERAL ACCIDENT REPORTING REQUIREMENTS AND PROTECTED FROM DISCLOSURE PURSUANT TO 49 U.S.C.20903 AND 83 U.S.C.490 FM 518 median construction—Exhibit C(revised-10-30-12) 11 Nf N-EMPLQYEE PERSONAL INJURY DATA COLLECTION INFORMATIDN REDDIRED TO BE COU CIED PURSt)ANTIII FEDERAL REGUIATION.IT SHOULD BE USED FUR COMPLIANCE WITH FEDERAL REGULATIONS DRLY.AND f f IS NOT INTENDED TO PRESUME ACCEPTANCE OF RESPONSIBILITY OR CIABIUTY. Incident.City/St. Z Date: Time: County 3.Temperature: 4.Weather, • (if non BUSFfocalion) to Post/Line Segment: Driver's license No(and state)or other ID: SSP((required): Name(last:first mi). Address: efty.- Si: • Zip: Date Of Birth and/or Age: Gender: (if available) one Number. Employer. Injury: 1D.Body Part: (i e.laceration.etc.) (ie..Hand.etc.) Description of Accident.(To include location,action.result,etc3: Treatment: First Aid Only Required)Medical Treatment Fi Other Medical Treatment Dr.Name: Date: Dr.Address: Street: City: Hospital Name: Hospital Address: Street City St Zip: Diagnosis: REPORT PREPARED TO COMPLY'MTH FEDERAL Asap NT REPORTING REQUIREM VIS_ AND PROTECTED FROM DISCLOSURE PURSUANT 49 U.S.C.20903 AND.83 t;.S.C:.490 FM 518 median construction—Exhibit C(revised 10-30-12) 12 Section 00800b • EXHIBIT "C-1" Agreement Between BNSF RAILWAY COMPANY and the CONTRACTOR BNSF RAILWAY COMPANY Attention: Manager Public Projects Railway Files:023204E Agency Project: FM 518/Broadway Street—construct center medians for QZ Gentlemen: The undersigned (hereinafter called, the "Contractor"), has entered into a contract(the "Contract") dated , with the City of Pearland, Texas for the performance of certain work in connection with the following project: new raised center medians on Broadway Street/FM 518 (DOT No. 023204B) at railroad milepost 9.00 in Pearland, Texas in accordance with the City of Pearland's plans (Exhibit "A" dated August 2012), attached to and made a part of this Agreement. Performance of such work will necessarily require Contractor to enter BNSF RAILWAY (1'1°'\ COMPANY ("Railway") right of way and property ("Railway Property"). The Contract provides that no work will be commenced within Railway Property until the Contractor employed in connection with said work for City of Pearland (i) executes and delivers to Railway an Agreement in the form hereof, and (ii) provides insurance of the coverage and limits specified in such Agreement and Section 3 herein. If this Agreement is executed by a party who is not the Owner, General Partner, President or Vice President of Contractor, Contractor must furnish evidence to Railway certifying that the signatory is empowered to execute this Agreement on behalf of Contractor. Accordingly, in consideration of Railway granting permission to Contractor to enter upon Railway Property and as an inducement for such entry, Contractor, effective on the date of the Contract, has agreed and does hereby agree with Railway as follows: Section 1. RELEASE OF LIABILITY AND INDEMNITY Contractor hereby waives, releases, indemnifies, defends and holds harmless Railway for all judgments, awards, claims, demands, and expenses (including attorneys' fees), for injury or death to all persons, including Railway's and Contractor's officers and employees, and for loss and damage to property belonging to any person, arising in any manner from Contractor's or any of Contractor's subcontractors' acts or omissions or any work performed on or about Railway's property or right-of-way. THE LIABILITY ASSUMED BY CONTRACTOR WILL NOT BE AFFECTED BY THE FACT, IF IT IS A FM 518—center median construction—Exhibit C-1 (revised 10-30-12) 1 l FACT, THAT THE DESTRUCTION, DAMAGE, DEATH, OR INJURY WAS OCCASIONED BY OR CONTRIBUTED TO BY THE NEGLIGENCE OF RAILWAY,. ITS AGENTS, SERVANTS, EMPLOYEES OR OTHERWISE, EXCEPT TO THE EXTENT THAT SUCH CLAIMS ARE PROXIMATELY CAUSED BY THE INTENSIONAL MISCONDUCT OR GROSS NEGLIGENCE OF RAILWAY. THE INDEMNIFICATION OBLIGATION ASSUMED BY CONTRACTOR INCLUDES ANY CLAIMS, SUITS OR JUDGMENTS BROUGHT AGAINST RAILWAY UNDER THE FEDERAL EMPLOYEE'S LIABILITY ACT, INCLUDING CLAIMS FOR STRICT LIABILITY UNDER THE SAFETY APPLIANCE ACT OR THE LOCOMOTIVE INSPECTION ACT,WHENEVER SO CLAIMED. Contractor further agrees, at its expense, in the name and.on behalf of Railway, that it will adjust and settle all claims made against Railway, and will, at Railways. discretion, appear and defend any suits or actions of law or in equity brought against Railway on any claim or cause of action arising or growing out of or in any manner connected with any liability assumed by Contractor under this Agreement for which Railway is liable or is alleged to be liable. Railway will give notice to .Contractor, in writing, of the receipt or dependency of such claims and thereupon Contractor must proceed to adjust and handle to a conclusion such claims, and in the event'of a suit being brought against Railway, Railway may forward summons and complaint or other process in connection therewith to Contractor, and Contractor, at Railway's discretion, must defend, adjust, or settle such suits and protect, indemnify, and save harmless Railway from and against all damages, judgments, decrees, attorney's fees, costs, and expenses growing out of or resulting from or incident to any such claims or suits. In addition to any other provision of this Agreement, in the event that all or any portion of this Article shall be deemed to be inapplicable for any reason, including without limitation as a result of a decision of an applicable court, legislative enactment or regulatory order, the parties agree that this Article shall be interpreted as requiring Contractor to indemnify Railway to the fullest extent permitted by applicable law. THROUGH THIS AGREEMENT .THE PARTIES EXPRESSLY INTEND FOR CONTRACTOR TO INDEMNIFY RAILWAY FOR RAILWAY'S ACTS OF NEGLIGENCE. It is mutually understood and agreed that the assumption of liabilities and indemnification provided for in this Agreement survive any termination of this Agreement. Section 2. TERM This Agreement is effective from the date of the Contract until (i) the completion of the project set forth herein, and (ii) full and complete payment to Railway of any and all sums or other amounts owing and due hereunder. FM 518—center median construction—Exhibit C-1 (revised 10-30-12) 2 Cis\I Section 3. INSURANCE Contractor shall, at its sole cost and expense, procure and maintain during the life of this Agreement the following insurance coverage: A. Commercial General Liability insurance. This insurance shall contain broad form contractual liability with a combined single limit of a minimum of $2,000,000 each occurrence and an aggregate limit of at least$6,000,000 but in no event less than the amount otherwise carried by the Contractor. Coverage must be purchased on a post 2004 ISO occurrence form or equivalent and include coverage for, but not limit to the following: • Bodily Injury and Property Damage • Personal Injury and Advertising Injury • Fire legal liability • Products and completed operations This policy shall also contain the following endorsements, which shall be indicated on the certificate of insurance: • The definition of insured contract shall be amended to remove any exclusion or other limitation for any work being done within 50 feet of railroad property. • Waver of subrogation in favor of and acceptable to Railway. • Additional insured endorsement in favor of and acceptable to Railway. • Separation of insureds. • The policy shall be primary and non-contributing with respect to any insurance carried by Railway. It is agreed that the workers' compensation and employers' liability related exclusions in the Commercial General Liability insurance policy(s) required herein are intended to apply to employees of the policy holder and shall not apply to Railway employees. No other endorsements limiting coverage as respects obligations under this Agreement may be included on the policy with regard to the work being performed under this agreement. B. Business Automobile Insurance. This insurance shall contain a combined single limit of at least $1,000,000 per occurrence, and include coverage for, but not limited to the following: • Bodily injury and property damage • • Any and all vehicles owned, used or hired Cub\ FM 518--center median construction—Exhibit C-1 (revised 10-30-12) 3 The policy shall also contain the following endorsements or language,which shall be indicated on the certificate of insurance: • Waiver of subrogation in favor of and acceptable to Railway. • Additional insured endorsement in favor of and acceptable to Railway. • Separation of insureds. • The policy shall be primary and non-contributing with respect to any insurance carried by Railway. • C. Workers Compensation and Employers Liability insurance including coverage for, but not limited to: • Contractor's statutory liability under the worker's compensation laws of the state(s) in which the work is to be performed. If optional under State law, the insurance must cover all employees anyway. • • Employers' Liability (Part B) with limits of at least $500,000 each • accident, $500,000 by disease policy limit, $500,000 by disease each employee. This policy shall also contain the following endorsements or language, which shall be indicated on the certificate of insurance: • Waiver of subrogation in favor of and acceptable to Railway. • D. Railroad Protective Liability insurance naming only the Railway as the Insured with coverage.of at least $2,000,000 per occurrence and $6,000,000 in the aggregate. The policy Must be issued on a standard ISO form CG 00 35 12 04 and include the following: . • Endorsed to include the Pollution Exclusion Amendment • Endorsed to include the Limited Seepage and Pollution Endorsement. • Endorsed to remove any exclusion for punitive damages. • No other endorsements restricting coverage may be added. ♦ The original policy must be provided to the Railway prior to performing any work or services under this Agreement ♦ Definition of"Physical Damage to Property" shall be endorsed to read: "means direct and accidental loss of or damage to all property owned by any named insured and all property in any named insured' care, custody, and control arising out of the acts or omissions of the contractor named on the Declarations. In lieu of providing a Railroad Protective Liability Policy, Licensee may participate (if available) in Railway's Blanket Railroad Protective Liability Insurance Policy. Other Requirements: FM 518—center median construction—Exhibit C-1 (revised 10-30-12) 4 • Where allowable by law, all policies (applying to coverage listed above) shall contain no exclusion for punitive damages. Contractor agrees to waive its right of recovery against Railway for all claims and suits against Railway. In addition, its insurers, through the terms of the policy or policy endorsement, waive their right of subrogation against Railway for all claims and suits. Contractor further waives its right of recovery, and its insurers also waive their right of subrogation against Railway for loss of its owned or leased property or property under Contractor's care, custody, or control. Allocated Loss Expense shall be in addition to all policy limits for coverages referenced above. Contractor is not allowed to self-insure without the prior written consent of Railway. If granted by Railway, self-insured retention or other financial responsibility for claims shall be covered directly by Contractor in lieu of insurance. Any and all Railway liabilities that would otherwise, in. accordance with the provisions of this Agreement, be covered by Contractor's insurance will be covered as if Contractor elected not to include a deductible, self-insured retention or other financial responsibility for claims. Prior to commencing the Work, Contractor shall furnish to Railway an acceptable certificate(s) of insurance from an authorized representative evidencing the required coverage(s), endorsements, and amendments. The certificate should be directed to the following addresses: BNSF Railway Company c/o CertFocus P.O. Box 140528 Kansas City, MO 64114 Toll Free: 877-576-2378 Fax number: 817-840-7487 Email: BNSF@certfocus.com www.certfocus.com Contractor shall notify Railway in writing at least 30 days prior to any cancellation, non-renewal, substitution, or material alteration. Any insurance policy must be written by a reputable insurance company acceptable to Railway or with a current Best's Guide Rating of A- and Class VII or better, and authorized to do business in the state(s) in which the service is to be provide. (11°.\ FM 518—center median construction—Exhibit C-1 (revised 10-30-12) 5 If coverage is purchased on a "claims made" basis, Contractor hereby agrees to maintain coverage in force for a minimum of three years after expiration, cancellation or termination of this contract. Annually, Contractor agrees to provide evidence of such coverage as required hereunder. Contractor represents that this Agreement has been thoroughly reviewed by Contractor's insurance agent(s)/broker(s), who have been instructed by Contractor to procure the insurance coverage required by this Agreement. Not more frequently than once every five years, Railway may reasonably modify the required insurance coverage to reflect then-current risk management practices in the railroad industry and underwriting practices in the insurance industry. If any portion of the operation is to be subcontracted by Contractor, Contractor shall require that the subcontractor shall provide and maintain the insurance coverage(s) set forth herein, naming Railway as an additional insured, and shall require that the subcontractor shall release, defend, and indemnify Railway to the same extent and under the same terms and conditions as Contractor is required to release, defend, and indemnify Railway herein. Failure to provide evidence as required by this section shall entitle, but not require, Railway to terminate this Agreement immediately. Acceptance of a certificate that-does not comply with this section shall not operate as a waiver of Contractor's ^) obligations hereunder. The fact that insurance (including, without limitation, self-insurance) is obtained by Contractor shall not be deemed to release or diminish the liability of Contractor including, without limitation, liability under the indemnity provisions of this Agreement. Damages recoverable by Railway shall not be limited by the amount of the required insurance coverage. In the event of a claim or lawsuit involving Railway arising out of this agreement,. Contractor will make available any required policy covering such claim or lawsuit. These insurance provisions are intended to be a separate and distinct obligation on the part of the Contractor. Therefore, these provisions shall be enforceable and Contractor shall be bound thereby regardless of whether or not indemnity provisions are determined to be enforceable in the jurisdiction in which the work covered hereunder is performed. For purposes of this section, Railway means 'Burlington Northern Santa Fe LLC", "BNSF RAILWAY COMPANY" and the subsidiaries, successors, assigns and affiliates of each. Section 4. EXHIBIT "C" CONTRACTOR REQUIREMENTS FM 518—center median construction—Exhibit C-1 (revised 10-30-12) 6 The Contractor must observe and comply with all provisions, obligations, requirements and limitations contained in the Contract, and the . Contractor Requirements set forth on Exhibit "C" attached to the Contract and this Agreement, , including, but not be limited to, payment of all costs incurred for any damages to Railway roadbed, tracks, and/or appurtenances thereto, resulting from use, occupancy, or presence of its employees, representatives, or agents or subcontractors on or about the construction site. Section 5. TRAIN DELAY. • Contractor is responsible for and hereby indemnifies and holds harmless Railway (including its affiliated railway companies, and its tenants) for, from and against all damages arising from any unscheduled delay to a freight or passenger train which affects Railway's ability to fully utilize its equipment and to meet customer service and contract obligations. Contractor will be billed, as further provided below, for the economic losses arising from loss of use of equipment, contractual loss of incentive pay and bonuses and contractual penalties resulting from train delays, whether caused by Contractor, or subcontractors, or by the Railway performing work under this Agreement. Railway agrees that it will not perform any act to unnecessarily cause train delay. For loss.of use of equipment, Contractor will be billed the current freight train hour rate per train as determined from Railway's records. Any disruption to train traffic may cause delays to multiple trains at the same time for the same period. Additionally, the parties acknowledge that passenger, U.S. mail trains and certain other grain, intermodal, coal and freight trains operate under incentive/penalty contracts between Railway and its customer(s). Under these arrangements, if Railway does not meet its contract service commitments, Railway may suffer loss of performance or incentive pay and/or be subject to penalty payments. Contractor is responsible for any train performance and incentive penalties or other contractual economic losses actually incurred by Railway which are attributable to a train delay caused by Contractor or its subcontractors. The contractual relationship between Railway and its customers is proprietary and confidential. In the event of a train delay covered by this Agreement, Railway will share information relevant to any train delay to the extent consistent with Railway confidentiality obligations. Damages for train delay are currently $382.20 per hour per incident. THE RATE THEN IN EFFECT AT THE TIME OF PERFORMANCE BY THE CONTRACTOR HEREUNDER WILL BE USED TO CALCULATE THE ACTUAL COSTS OF TRAIN DELAY PURSUANT TO THIS AGREEMENT. Contractor and its subcontractors must give Railway's Roadmaster Patrick McAleese at Office: 713-847-3176 or Cell: 281-785-0607 and email: patrick.mcaleese(a bnsf.com representative four (4) weeks advance notice of the Ciu*'\ FM 518—center median construction—Exhibit C-1 (revised 10-30-12) 7 times and dates for proposed work windows. Railway and Contractor will establish mutually agreeable work windows for the project. Railway has the right at any time to revise or change the work windows due to train operations or service obligations. Railway will not be responsible for any additional costs or expenses resulting from a change in work windows. Additional costs or expenses resulting from a change in work windows shall be accounted for in Contractor's expenses for the project. Contractor and subcontractors must plan, schedule, coordinate and conduct all Contractor's work so as to not cause any delays to any trains. • FM 518-center median construction-Exhibit C-1 (revised 10-30-12) 8 Kindly acknowledge receipt of this letter by signing and returning to the Railway two original copies of this letter, which, upon execution by Railway, will. constitute an Agreement between us. BNSF Railway Contractor • By: By: Printed Name: Name: Timothy J. Huya Manager Public Projects Title: Contact Person: Accepted and effective this day of 2012. Address: \ City: State.. - Zip: Fax: Phone: Email: FM 518—center median construction—Exhibit C-1 (revised 10-30-12) 9 CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION Section 00811 WAGE SCALE FOR ENGINEERING CONSTRUCTION 1.01 In accordance with the Prevailing Wage law on Public Works (Article 2258 of the Texas Government Code), the public body awarding the contract does hereby specify the rates shown in Table 00811-A following to be the general prevailing rates in the locality in which the work is being performed. 1.02 This prevailing wage rate does not prohibit the payment of more than the rates stated. 1.03 The wage scale for engineering construction is to be applied to all site work greater than five(5)feet from an exterior wall of new building under construction or from an exterior wall of an existing building. (Attach the current wage rates. Number the pages 00811-2, 00811-3, etc.) 10-2012 00811 - 1 of 1 Page 1 of4 Section 00811-1 General Decision Number: TX130056 01/04/2013 TX56 rifa6\ Superseded General Decision Number: TX20120056 State: Texas Construction Type: Highway Counties: Austin, Brazoria, Chambers, Fort Bend, Galveston, Hardin, Harris, Jefferson, Liberty, Montgomery, Orange, San Jacinto and Waller Counties in Texas. HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction; bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction; and other major bridges) . Modification Number Publication Date 0 01/04/2013 * SUTX2011-013 08/10/2011 Rates Fringes CEMENT MASON/CONCRETE FINISHER (Paving and Structures) $ 12.98 ELECTRICIAN $ 27.11 FORM BUILDER/FORM SETTER Paving & Curb $ 12.34 Structures $ 12.23 LABORER Asphalt Raker $ 12.36 Flagger $ 10.33 Laborer, Common $ 11.02 Laborer, Utility $ 11.73 Pipelayer $ 12.12 Work Zone Barricade Servicer $ 11.67 PAINTER (Structures) $ 18.62 POWER EQUIPMENT OPERATOR: Asphalt Distributor $ 14.06 Asphalt Paving Machine $ 14.32 Broom or Sweeper $ 12.68 Concrete Pavement Finishing Machine $ 13.07 Concrete Paving, Curing, Float, Texturing Machine $ 11.71 Concrete Saw $ 13.99 Crane, Hydraulic 80 Tons or less $ 13.86 Crane, Lattice boom 80 http://www.wdol.gov/wdol/scafiles/davisbacon/TX56.dvb?v=0 1/10/2013 Page 2 of 4 Section 00811-2 tons or less $ 14.97 Crane, Lattice boom over 80 Tons $ 15.80 Crawler Tractor $ 13.68 Excavator, 50,000 pounds or less $ 12.71 Excavator, Over 50, 000 pounds $ 14.53 Foundation Drill, Crawler Mounted $ 17.43 Foundation Drill, Truck Mounted $ 15.89 Front End Loader 3 CY or Less $ 13.32 Front End Loader, Over 3 CY $ 13.17 Loader/Backhoe $ 14.29 Mechanic $ 16.96 Milling Machine $ 13.53 Motor Grader, Fine Grade $ 15.69 Motor Grader, Rough $ 14.23 Off Road Hauler $ 14.60 Pavement Marking Machine $ 11.18 Piledriver $ 14.95 Roller, Asphalt $ 11.95 Roller, Other $ 11.57 Scraper $ 13.47 Spreader Box $ 13.58 Servicer $ 13.97 Steel Worker Reinforcing Steel $ 15.15 Structural Steel Welder $ 12.85 Structural Steel $ 14.39 TRUCK DRIVER Low Boy Float $ 16.03 Single Axle $ 11.46 Single or Tandem Axle Dump $ 11.48 Tandem Axle Tractor w/Semi Trailer $ 12.27 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii) ) . The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the http://www.wdol.gov/wdollscafiles/davisbacon/TX56.dvb?v=0 1/10/2013 Page 3 of 4 Section 00811-3 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate:whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local. union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates. 0000/9999: weighted union wage rates will be published annually each January. (119111 Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on (glib\ a wage determination matter * a conformance (additional classification and rate) ruling http://www.wdol.gov/wdol/scafiles/davisbacon/TX56.dvb?v=0 1/10/2013 Page 4 of 4 Section 00811-4 On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3. ) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2. ) If the answer to the question in 1. ) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7) . Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board) . Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION http://www.wdol.gov/wdol/scafiles/davisbacon/TX56.dvb?v=0 1/10/2013 CITY OF PEARLAND TECHNICAL SPECIFICATIONS DIVISION 1 TECHNICAL SPECIFICATIONS DIVISION 1 Cibk\ GENERAL REQUIREMENTS 04/2008 CITY OF PEARLAND SUMMARY OF WORK 05/2008 01100- 1 of 2 Section 01100 SUMMARY OF WORK 1.0 GENERAL 1.01 SECTION INCLUDES A A summary of the Work to be performed under this Contract,work by Owner,Owner furnished products, Work sequence, future Work, Contractor's use of Premises, and Owner occupancy. 1.02 WORK COVERED BY CONTRACT DOCUMENTS A Work of the Contract is for the construction of Improvements to the median and BNSF railroad crossing located at W. Broadway Street(FM 518). 1.03 WORK BY OWNER A Not Applicable 1.04 OWNER FURNISHED PRODUCTS A Not Applicable 1.05 WORK SEQUENCE A Contractor is to follow the plans and specifications. B Contractor to submit project schedule to Engineer&Owner for approval as specified in Section 01300—Submittals. C Contractor shall coordinate the Work with the Engineer and Owner as specified in Section 01040 -Coordination and Meetings. 1.06 FUTURE WORK A Not Applicable 1.07 CONTRACTOR'S USE OF PREMISES A Comply with procedures for access to the site and Contractor's use of rights-of-way as specified in Section 01140 - Contractor's Use of Premises. B Contractor shall be responsible for all utilities required for construction. 1.08 OWNER OCCUPANCY CITY OF PEARLAND SUMMARY OF WORK 05/2008 01100- 1 of2 CITY OF PEARLAND SUMMARY OF WORK 05/2008 01100-2 of 2 A Cooperate with the Owner to minimize conflict, and to facilitate the Owner's operations. Coordinate Contractor's activities with Engineer. B Schedule Work to accommodate this requirement. 2.0 PRODUCTS-NotUsed 3.0 EXECUTION-NotUsed END OF SECTION (11.16.\ CITY OF PEARLAND SUMMARY OF WORK 05/2008 01100-2 of 2 CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES Section 01140 CONTRACTOR'S USE OF PREMISES 1.0 GENERAL 1.01 SECTION INCLUDES A General use of the Project Site including properties inside and outside of the limits of construction, work affecting roads, ramps, streets and driveways and notification to adjacent occupants. B References to Technical Specifications: 1 Section 01350—Submittals 2 Section 01730—Cutting &Patching 3 Section 01555—Traffic Control &Regulation 4 Section 01562—Waste Material Disposal 5 Section 01720—Field Surveying 6 Section 02980—Pavement Repair 7 Section 02770—Curbs, Curb &Gutter, &Headers 8 Section 02255—Bedding, Backfill, &Embankment Materials 9 Section 02922—Sodding 10 Section 02921 —Hydromulch Seeding ^� 1.02 SUBMITTALS 1 A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1.03 LIMITS OF CONSTRUCTION A Confine access,operations,and storage areas to limits of construction as shown on the Plans provided by Owner as stipulated in Section 00700 — General Conditions of Agreement; trespassing on abutting lands or other lands in the area is not allowed. B Contractor may make arrangements,at Contractor's cost,for temporary use of private properties,in which case Contractor and Contractor's surety shall indemnify and hold harmless the Owner against claims or demands arising from such use of properties outside of the limits of construction. 1. Improvements to private properties made for the Contractor's use must be removed upon completion of the Work. a. No fill material may be placed in temporary work areas or on adjacent private properties without the written permission of the Engineer or the issuance of a Fill Permit by the City of Pearland or other governing entity. C Restrict total length which materials may be distributed along the route of the construction at any one time to 1,000 linear feet unless otherwise approved by Engineer. 02/2008 01140- 1 of 4 CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES 1.04 PROPERTIES OUTSIDE OF LIMITS OF CONSTRUCTION A Altering the condition of properties adjacent to and along the limits of construction will not be permitted unless authorized by the Engineer and property owner(s). B Means,methods,techniques,sequences,or procedures which will result in damage to properties or improvements in the vicinity outside of the limits of construction will not be permitted. C Any damage to properties outside of the limits of construction shall be repaired or replaced to the satisfaction of the Engineer and at no cost to the Owner. D Contractor shall protect or replace all property corners,monuments or other demarcations disturbed, damaged or lost as a result of his activities. The replacement of these devices shall be properly documented to the satisfaction of the City by a Registered Public Land Surveyor with copies delivered to the Owner or private property owner. 1.05 USE OF SITE A Obtain approvals of governing authorities prior to impeding or closing public roads or streets. Do not close consecutive intersections simultaneously. B Notify Engineer 48 hours prior to closing a street or a street crossing. Permits for street closures are required in advance and are the responsibility of the Contractor. C Maintain access for emergency vehicles including access to fire hydrants. D Avoid obstructing drainage ditches or inlets; when obstruction is unavoidable due to requirements of the Work, provide grading and temporary drainage structures to maintain unimpeded flow. E Locate and protect private lawn sprinkler systems which may exist on rights-of-ways within the Project Site. Repair or replace damaged systems to condition equal to or better than that existing at start of the Work. F When required by the Work, cutting, patching, and fitting of Work to existing facilities,accommodating installation or connection of Work with existing facilities,or uncovering Work for access, inspection, or testing shall be performed in accordance with Section 01730—Cutting&Patching. G Fires are not permitted on the Project Site. 1.06 NOTIFICATION TO ADJACENT OCCUPANTS A Notify individual occupants in areas to be affected by the Work of the proposed construction and time schedule. Notification shall be 24 hours,72 hours and 2 weeks prior to work being performed within 200 feet of the homes or businesses. 02/2008 01140-2 of 4 CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES B Include in notification names and telephone numbers of two representatives for resident contact,who will be available on 24-hour call. Include precautions which will be taken to protect private property and identify potential access or utility inconvenience or disruption. C Submit proposed notification to Engineer for approval. Consideration shall be given to the ethnicity of the neighborhood where English is not the dominant language. Notice shall be in an understandable language. 1.07 EXCAVATION IN STREETS AND DRIVEWAYS A Avoid hindering or needlessly inconveniencing public travel on a street or any intersecting alley or street for more than two blocks at any one time, except by permission of the Engineer. B Obtain the Engineer's approval when the nature of the Work requires closing of an entire street. Permits required for street closure are the Contractor's responsibility. Avoid unnecessary inconvenience to abutting property owners. C Remove surplus materials and debris and open 1000 feet or less for public use as work in that block is complete. D Acceptance of any portion of the Work will not be based on return of street to public use. E Avoid obstructing driveways or entrances to private property. F Provide temporary crossing or complete the excavation and backfill in one continuous operation to minimize the duration of obstruction when excavation is required across drives or entrances. G Provide barricades and signs in accordance with Section 01555 —Traffic Control & Regulation. 1.08 CLEAN-UP A Maintain Project Site in a neat and orderly manner. B Perform daily clean-up in and around construction zone of dirt,debris,scrap materials, other disposable items. C Leave streets, driveways, and sidewalks broom-clean or its equivalent at the end of each work day. D Promptly remove barriers,signs,and components of other control systems that are no longer being utilized. E Dispose of waste and excess materials in accordance with requirements of Section 01562—Waste Material Disposal. 02/2008 01140-3 of 4 CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES (101`\ 1.09 RESTORATION A Restore damaged permanent facilities to pre-construction conditions unless replacement or abandonment of facilities is indicated on the Plans. B Repair/Replace removed or damaged pavement in accordance with Section 02980— Pavement Repair and removed or damaged curbs, gutters, and headers in accordance with Section 02770— Curbs, Curb & Gutter, & Headers. Repair/Replace with like materials to match existing style, lines, grades, etc., unless otherwise directed by Engineer. C Repair turf areas which become damaged by Contractor's operations at no additional cost to Owner. Level with bank sand or topsoil, conforming to Section 02255—Bedding,Backfill, & Embankment Materials, as approved by the Engineer. Provide sodding in areas of residential land use over the surface of ground disturbed during construction and not paved, or not designated to be paved, in accordance with Section 02922—Sodding. Use only block sodding; do not use spot sodding or sprigging Provide hydromulch seeding in areas of commercial,industrial or undeveloped land use over the surface of ground disturbed during construction and not paved, or not designated to be paved, in accordance with Section 02921 —Hydromulch Seeding. Water and level newly sodded areas with adjoining turf using steel wheel rollers CimbN appropriate for sodding. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION (01N. 02/2008 01140-4 of 4 CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES Section 01200 MEASUREMENT AND PAYMENT PROCEDURES 1.0 GENERAL 1.01 SECTION INCLUDES A Procedures for measurement and payment of Work. B Conditions for nonconformance assessment and nonpayment for rejected products. C References to Technical Specifications: See Bid Proposal Sheet D Reference Standards: 1. Concrete Reinforcing Steel Institute(CRSI) 2. American Institute of Steel Construction(AISC) 1.02 AUTHORITY A Units and methods delineated in this Section are intended to complement the criteria of the Technical Specifications and Section 00300—Bid Proposal. B In the event of conflict, the unit specified for Bid Items in Section 00300 — Bid Proposal shall govern. C Measurements and quantities submitted by the Contractor will be verified by the City or City's Representative. Payment shall be based on actual field installed quantities unless otherwise specifically stated. D Contractor shall provide necessary equipment, workers, and survey personnel as required by City or City's Representative to verify quantities. 1.03 UNIT QUANTITIES SPECIFIED A Quantity and measurement estimates stated in Section 00300—Bid Proposal are for contract purposes only.Quantities and measurements supplied or placed in the Work, authorized and verified by City or City's Representative shall determine payment as stated in Section 00700—General Conditions of Agreement. B If the actual Work requires greater or lesser quantities than those quantities indicated in Section 00300 — Bid Proposal, provide the required quantities at the unit prices contracted except as otherwise stated in Section 00700 — General Conditions of Agreement or in executed Change Order. 1.04 MEASUREMENT OF QUANTITIES A Measurement by Weight: Reinforcing steel, rolled or formed steel or other metal shapes will be measured by CRSI or AISC Manual of Steel Construction weights. 09/10 01200- 1 of 3 CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES (111.1\, Welded assemblies will be measured by CRSI or AISC Manual of Steel Construction or scale weights. B Measurement by Volume: 1. Stockpiles: Measured by cubic dimension using mean length,width, and height or thickness. 2. Excavation and Embankment Materials: Measured by cubic dimension using the average end area method. C Measurement by Area: Measured by square dimension using mean length and width or radius. D Linear Measurement: Measured by linear dimension, at the item centerline or mean chord. E Stipulated Price Measurement: By unit designated in the agreement. F Other: Items measured by weight,volume, area, or lineal means or combination, as appropriate, as a completed,item or unit of the Work. 1.05 LUMP SUM A In the event that the work of the Contract is identified as a Stipulated or Lump Sum contract in the Invitation to Bidders,Section 00300"Bid Proposal"shall state that the (1111116\ work is to be performed as a single fixed cost or"Lump Sum" agreement. 1. Under a Lump Sum contract the Contractor shall propose a single fixed price to include all work identified in the plans and specifications.This lump sum shall include: General Conditions,Insurance and Bonds, Warranties and Licenses, Cost of Utilities, and the Contractor's Profit and Overhead. A Stipulated Sum contract may also request that the Bidder provide additional unit cost information for certain items that would allow the Owner to add additional quantities to the work. 2. Upon award of the Contract,the Contractor shall immediately prepare a "Schedule of Values"for presentation to the Owner for review and approval before the start of any work. The Schedule of Values shall form the basis of an incremental progress payment schedule to follow the progressive completion of the work on a monthly basis and form the basis of the monthly Pay Application. a. Progress Payments for Lump Sum work; See subparagraph 1.06 D below b. Claims for work not specifically identified in the Schedule of Values: See subparagraph 1.06 A below. c. Final Payment will be made on the basis of a demonstrated completion and functioning of the work as contained in the Substantial Completion and Final Completion and Acceptance phases of the work. (1111'' 1.06 PAYMENT 09/10 01200-2 of 3 CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES A Payment includes full compensation for all required supervision,labor,products,tools, equipment,plant,transportation,services,and incidentals;and erection,application or installation of an item of the Work; and Contractor's overhead and profit. The price bid shall include the total cost for required Work. Claims for payment as Unit Price Work not specifically covered in Section 00300—Bid Proposal will not be accepted. B Progress Payments for Unit Price Work will be based on the City or City's Representative's observations and evaluations of quantities incorporated in the Work multiplied by the unit price. C Final Payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities determined by City or City's Representative multiplied by the unit price for Work which is incorporated in or made necessary by the Work D Progress Payments for Lump Sum Work will be based on the Contractor's itemized Application for Partial Payment for operations completed in accordance with the approved schedule of values and the accumulated percentages complete as verified by the City's Representative's observations and evaluations of the percentage of each line item integrated into the work. 1. Application for Payment for materials,may be made provided a. Owner has approved such amounts and materials in advance and b. said materials are suitably stored on site and accompanied by sufficient evidence of proper protection and insurance as Owner shall require. c. No application may be made for materials stored off site unless approved dollar amounts, storage arrangements, lien releases and insurance in advance 2. Application may not be made for any portion of work or materials the Contractor does not intend to pay to a Sub-Contractor or Material Vendor. E Final payment for Work shall be made only upon written notice from the Contractor that work is complete,functioning and ready for fmal inspection. Such final payment and release of any remaining retainage shall be made only after the following requirements are satisfied a. Contractor provides an affidavit of All Bills Paid, duly notarized b. Contractor provides a Certificate indicating that any insurance required to remain in force is in effect and will not expire until at least 3o days from prior written notice is received by Owner c. Contractor provides an executed Conditional Release of Liens d. Successful completion of all final inspections by all entities with authority over the use, occupancy and performance of the completed work. 1.07 NONCONFORMANCE ASSESSMENT A Remove and replace the Work, or portions of the Work, not conforming to the Contract Documents. 09/10 01200-3 of 3 CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES Ilh\, B If,in the opinion of the City or City's Representative,it is not practical to remove and replace the Work, the City or City's Representative will direct one of the following remedies: 1. The nonconforming Work will remain as is,but the unit price will be adjusted to a lower price at the discretion of the City or City's Representative. . 2. The nonconforming Work will be modified as authorized by the City or City's Representative,and the unit price will be adjusted to a lower price at the discretion of the City or City's Representative, if the modified Work is deemed to be less suitable than originally specified. C Individual Technical Specifications may modify these options or may identify a specific formula or percentage price reduction. D The authority of the City or City's Representative to assess the nonconforming Work and identify payment adjustment is final. 1.08 NONPAYMENT FOR REJECTED PRODUCTS A Payment will not be made for any of the following: 1. Products wasted or disposed of in a manner that is not acceptable to Engineer. 2. Products determined as nonconforming before or after placement. 3. Products not completely unloaded from transporting vehicle. 4. Products placed beyond the lines and levels of the required Work. 5. Products remaining on hand after completion of the Work,unless specified otherwise. 6. Loading,hauling, and disposing of rejected products. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed 4.0 UNIT PRICE ITEMS 4.01 MOBILIZATION A. Measurement for Mobilization is on a Lump Sum basis. Including 50 percent of the cost of Mobilization in the first monthly Application for Payment. B. Payment is subject to the receipt and approval by Engineer of the following items,as applicable: 1. Schedule of Values(Section 01350—Submittals) 2. Trench Safety Program(Section 01570—Trench Safety System) 3. Construction Schedule(Section 01350—Submittals) 4.Pre-construction Photographs(Section 01380—Construction Photographs) 5. Installation and acceptance of Project Identification Sign(s) 09/10 01200-4 of 3 CITY OFPEARLAND MEASUREMENT AND PAYMENT PROCEDURES C. Payment of the remaining 50 percent of the Contract Price for Mobilization is subject to completion of Temporary Facilities as specified in Section 01500, inclusive. D. Mobilization payments will be subject to Retainage as stipulated in Section 00700- General Conditions of Agreement 4.02 TRAFFIC CONTROL AND REGULATION A. Measurement and payment is on a lump sum basis for traffic control and regulation, including obtaining approvals by governing authorities,preparation and submittal of traffic control plan if different than shown on Drawings,and subsequent approval from City and any other entity prior to commencing work in their right-of-way,provision of traffic control devices, barrels, barricades, control panels, signage including arrow boards as necessary for the project, temporary pavement for transitioning including removal,relocation of traffic signs and control devices as necessary,removing existing signs and provision of equipment and personnel as necessary to protect the work and the public in accordance with the Texas Manual of Uniform Traffic Control Devices (TxMUTCD). The amount invoiced shall be determined based on the approved schedule of values for traffic control and regulation.Payment will include and be full compensation for all labor, equipment, materials, supervision, and all incidental expenses for construction of this item,complete and in place,including but not limited to furnishing and placing all materials, maintenance requirements, repair and replacement of damaged sections, removal and disposal of sediment deposits, and removal and disposal of erosion protection and sediment control systems after final stabilization. B. No separate measurement will be made for flaggers or uniformed officer as required for the Project. Flaggers or uniformed officer shall be considered incidental to the traffic control and regulation bid item. 4.03 REMOVE EXISTING ASPHALT AND CONCRETE PAVEMENT A. Measurement and payment for removal and disposal of existing asphaltic pavement and base material, to the total depth specified, with or without concrete curb and gutter, including sawcutting is on a square yard basis measured from the edge of pavement or from the back of curb. 4.04 REGRADE AREA FOR SWALE A. Payment for regrading swale as shown on plan drawings will be measured by the linear feet of swale regraded, including sodding and restoration of disturbed areas. 4.05 REINFORCED FILTER FABRIC FENCE A. Measurement shall be by the linear foot of completed and accepted fence between the limits of the beginning and ending of wooden stakes. B. Payment includes full compensation for all labor, equipment,materials,supervision, and all incidental expenses for construction of these items, complete in place, n including maintenance requirements, repair and replacement of damaged sections, 09/10 01200-5 of 3 CITY OFPEARLAND MEASUREMENT AND PAYMENT PROCEDURES (b.\ removal and disposal of sediment deposits, and removal of fence at the end of construction. C. The Contractor shall install and maintain reinforced filter fabric fence in areas where active construction is ongoing. 4.06 6"HMAC BASE COURSE (BLACK BASE) A. Measurement for 6" HMAC Base Course shall be paid for by the square yard. Payment for 6" HMAC Base Course will be paid for at the unit price bid and shall include full compensation for materials, delivery, equipment, labor, tools and incidentals. 4.07 TYPE"D"HMAC PAVING A, Measurement for Type"D"HMAC Paving shall be paid for by the square yard.This price includes payment for associated work performed in accordance with TxDot specification section 340. No additional payment will be made for tack coat. This shall be full compensation for labor,materials,tools,and operations necessary for the work. 4.08 REMOVE &REPLACE CONCRETE DRIVEWAY A. Measurement for removing and disposing of existing driveway and replacing with 6" (111"\. thick concrete driveway is on square yard basis and shall include saw-cutting, curb return,monolithic curb,subgrade,reinforcement and joints.No partial payment will be made for removal of driveway. Payment for remove and replace driveway will be made when the driveway is replaced. 4.09 6" CONCRETE MEDIAN A. Measurement for construction of"6"Concrete Median" is on a square yard basis and paid for at the contract unit price bid for"6"Concrete Median",which price shall be full compensation for the construction of and for furnishing,hauling and placing all materials;for furnishing and placing reinforcing steel;for furnishing and placing joint materials;for curing and for all manipulations,labor,equipment,tools and incidentals necessary to complete the work. 4.10 CURB/MONOLITHIC CURB AND GUTTER A. Measurement and payment for proposed reinforced concrete curb,reinforced doweled concrete curb and reinforced monolithic curb and gutter is on linear foot basis measured along face of curb and shall include saw cutting,reinforcement and joints. Curb returns installed with driveway or sidewalks will be NOT be paid for under this item.Curbs on driveways and sidewalks are paid as part of bid item for driveways and sidewalks. (11.1'\ 09/10 01200-6 of 3 CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES 4.11 PAVEMENT MARKINGS A. Measurement and payment for a thermoplastic pavement marking is on a linear foot basis for each class and width, measured in place as indicated in the bid proposal. Measurement and payment is not made for the gaps between broken lines B. Measurement and payment for a thermoplastic pavement marking on a median curb is on a linear foot basis,measured in place as indicated in the bid proposal. C. Payment for words and symbols is for each word or symbol. D. Unit price bid for each item shall include full compensation for removing all existing striping that will conflict with the proposed striping, furnishing and placing all materials, and for all manipulations, including blast cleaning, surface sealing and priming, labor, tools, equipment, and incidentals necessary to complete the Work in accordance with the drawings and specifications. END OF SECTION 09/10 01200-7 of 3 CITY OF PEARLAND CHANGE ORDER PROCEDURES (sub\'' Section 01290 CHANGE ORDER PROCEDURES 1.0 GENERAL 1.01 SECTION INCLUDES A Procedures for processing Change Orders, including: 1. Assignment of a responsible individual for approval and communication of changes in the Work; 2. Documentation of change in Contract Price and Contract Time; 3. Change procedures, using proposals and construction contract modifications,Work Change Directive, Stipulated Price Change Order,Unit Price Change Order,Time and Materials Change Order; 4. Execution of Change Orders; 5. Correlation of Contractor Submittals. B References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01760—Project Record Documents C Other References: 1. Rental Rate Blue Book for Construction Equipment(Data Quest Blue Book). Rental Rate is defined as the full unadjusted base rental rate for the appropriate item of construction equipment. 1.02 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1.03 RESPONSIBLE INDIVIDUAL A Contractor shall provide a letter indicating the name and address of the individual authorized to execute change documents, and who shall also be responsible for informing others in Contractor's employ and Subcontractors of changes to the Work. The information shall be provided at the Preconstruction Conference. 1.04 DOCUMENTATION OF CHANGE IN CONTRACT PRICE AND CONTRACT TIME A Provide full information required for identification and evaluation of proposed changes, and to substantiate costs of proposed changes in the Work. B Contractor shall document each,Proposal for Change in cost or time with sufficient data to allow for its evaluation. 02/2008 01290- 1 of 4 CITY OF PEARLAND CHANGE ORDER PROCEDURES C Proposal for Change shall include, as a minimum, the following information as applicable: 1. Original Quantities of items in Section 00300—Bid Proposal with additions, reductions, deletions, and substitutions. 2. When Work items were not included in Section 00300—Bid Proposal, Contractor shall provide unit prices for the new items, with supporting information as required by the Engineer. 3. Justification for any change in Contract Time. 4. Additional data upon request. D For changes in the Work performed on a time-and-material basis, the following additional information may be required: 1. Quantities and description of products and equipment. 2. Taxes, insurance and bonds. 3. Overhead and profit as noted in Section 00700—General Conditions of Agreement,7.03 "Extra Work". 4. Dates and times work was performed, and by whom. 5. Time records and certified copies of applicable payrolls. 6. Invoices and receipts for products, rented equipment, and subcontracts, similarly documented. E Rented equipment will be paid to the Contractor by actual invoice cost for the duration of time required to complete the extra work. If the extra work comprises only a portion of the rental invoice where the equipment would otherwise be on the site,the Contractor shall compute the hourly equipment rate by dividing the actual monthly invoice by 176. (One day equals 8 hours and one week equals 40 hours.) Operating costs shall not exceed the estimated operating costs given for the item of equipment in the Blue Book. F For changes in the work performed on a time-and-materials basis using Contractor- owned equipment, compute rates with the Blue Book as follows: 1. Multiply the appropriate Rental Rate by an adjustment factor of 70 percent plus the full rate shown for operating costs. The Rental Rate utilized shall be the lowest cost combination of hourly, daily, weekly or monthly rates. Use 150 percent of the Rental Rate for double shifts (one extra shift per day) and 200 percent of the Rental Rate for more than two shifts per day. No other rate adjustments shall apply. 2. Standby rates shall be 50 percent of the appropriate Rental Rate shown in the Blue Book. Operating costs will not be allowed. 1.05 CHANGE PROCEDURES A Changes to Contract Price or Contract Time can only be made by issuance of a Change Order. Issuance of a Work Change Directive or written acceptance by the Engineer of changes will be formalized into Change Orders. All such changes will be in accordance with the requirements of Section 00700 — General Conditions of Agreement, 7.01 "Change Orders". 02/2008 01290-2 of 4 CITY OF PEARLAND CHANGE ORDER PROCEDURES Cigi° B The Engineer will advise Contractor of Minor Changes in the Work not involving an adjustment to Contract Price or Contract Time as authorized by Section 00700 — General Conditions of Agreement, 7.02 "Minor Changes", by issuing supplemental instructions. C Contractor may request clarification of Plans, Technical Specifications or Contract Documents or other information. Response by the Engineer to a Request for Information does not authorize the Contractor to perform tasks outside the scope of the Work. All changes must be authorized as described in this Section. 1.06 PROPOSALS FOR CHANGE AND CONTRACT MODIFICATION A The Engineer may issue a-Request for Proposal,which includes a detailed description of a proposed change with supplementary or revised Plans and Technical Specifications.The Engineer may also request a proposal in the response to a Request for Information. Contractor will prepare and submit its Proposal for Change within 7 days or as specified in the request. B The Contractor may propose an unsolicited change by submitting a Proposal for Change to the Engineer describing the proposed change and its full effect on the Work, with a statement describing the reason for the change and the effect on the Contract Price and Contract Time including full documentation. (110'N 1.07 WORK CHANGE DIRECTIVE A Engineer may issue a signed Work Change Directive instructing the Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order. B The document will describe changes in the Work and will designate a method of determining any change in Contract Price or Contract Time. C Contractor shall proceed promptly to execute the changes in the Work in accordance with the Work Change Directive. 1.08 STIPULATED PRICE CHANGE ORDER A A Stipulated Price Change Order will be based on an accepted Proposal for Change including the Contractor's lump sum price quotation. 1.09 UNIT PRICE CHANGE ORDER A Where Unit Prices for the affected items of the Work are included in Section 00300- Bid Proposal ,the Unit Price Change Order will be based on unit prices as originally bid, subject to provisions of Section 00700—General Conditions of Agreement. B Where unit prices of the Work are not pre-determined in Section 00300 — Bid Proposal, Work Change Directive or accepted Proposal for Change will specify the unit prices to be used. 02/2008 01290-3 of 4 CITY OF PEARLAND CHANGE ORDER PROCEDURES 1.10 TIME-AND-MATERIAL CHANGE ORDER A Contractor shall provide an itemized account and supporting data after completion of change,within time limits indicated for claims in Section 00700—General Conditions of Agreement. B Engineer will determine the change allowable in Contract Price and Contract Time as provided in Section 00700—General Conditions of Agreement. C Contractor shall maintain detailed records of work done on time-and-material basis as specified in this Section, 1.04 "Documentation of Change in Contract Price and Contract Time". D Contractor shall provide full information required for evaluation of changes,and shall substantiate costs for changes in the Work. 1.11 EXECUTION OF CHANGE DOCUMENTATION A Engineer will issue Change Orders, Work Change Directives, or accepted Proposals for Change for signatures of parties named in Section 00500 — Standard Form of Agreement. 1.12 CORRELATION OF CONTRACTOR SUBMITTALS A For Stipulated Price Contracts, Contractor shall promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Price. B For Unit Price Contracts,the next monthly Application for Payment of the Work after acceptance of a Change Order will be revised to include any new items not previously included and the appropriate unit rates. C Contractor shall promptly revise progress schedules to reflect any change in Contract Time,and shall revise schedules to adjust time for other items of work affected by the change, and resubmit for review. D Contractor shall promptly enter changes to the on-site and record copies of the Plans, Technical Specifications or Contract Documents as required in Section 01760 — Project Record Documents. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 02/2008 01290-4 of 4 CITY OF PEARLAND COORDINATION AND MEETINGS Club Section 01310 COORDINATION AND MEETINGS 1.0 GENERAL 1.01 SECTION INCLUDES A Section includes general coordination including Preconstruction Conference, Site Mobilization Conference, and Progress Meetings. B References to Technical Specifications: 1. Section 01100—Summary of Work 1.02 RELATED DOCUMENTS A Coordination is required throughout the documents. Refer to all of the Contract Documents and coordinate as necessary. 1.03 ENGINEER AND REPRESENTATIVES A The Engineer may act directly or through designated representatives as defined in Section 00700 — General Conditions of Agreement, 1.01 "Owner, Contractor, and Engineer", and as identified by name at the Preconstruction Conference. 1.04 CONTRACTOR COORDINATION A Coordinate scheduling,submittals,and work of the various Technical Specifications to assure efficient and orderly sequence of installation of interdependent construction elements. B Coordinate completion and clean up of the Work for Substantial Completion and for portions of the Work designated for Owner's partial occupancy. C Coordinate access to Project Site for correction of nonconforming work to minimize disruption of Owner's activities where Owner is in partial occupancy. 1.05 PRECONSTRUCTION CONFERENCE A Engineer will schedule a Preconstruction Conference. B Attendance Required: Engineer's representatives,Consultants,Contractor,and major Subcontractors. C Agenda: 1. Distribution of Contract Documents. 2. Designation of personnel representing the parties to the Contract, and the Consultant. 3. Review of insurance. 02/2008 01310- 1 of 3 CITY OF PEARLAND COORDINATION AND MEETINGS �-�, 4. Discussion of formats proposed by the Contractor for Schedule of Values, 1 and Construction Schedule. 5. Discussion of required Submittals,including, but not limited to, Work Plans,Traffic Control Plans, Safety Programs, Construction Photographs. 6. Procedures and processing of Shop Drawings and other submittals, substitutions,Applications for Payment,Requests for Information, Request for Proposal, Change Orders, and Contract Closeout. 7. Scheduling of the Work and coordination with other contractors. 8. Review of Subcontractors. 9. Appropriate agenda items listed in this Section, 1.06 "Site Mobilization Conference", when Preconstruction Conference and Site Mobilization Conference are combined. 10. Procedures for testing. 11. Procedures for maintaining Project Record Documents. 12. Designation of the individual authorized to execute change documents and their responsibilities. 13. Discussion of requirements of a Trench Safety Program. 1.06 SITE MOBILIZATION CONFERENCE A When required by Section 01100—Summary of Work,Engineer will schedule a Site Mobilization Conference at the Project Site prior to Contractor occupancy. B Attendance Required: Engineer representatives, Consultants, Contractor's Superintendent, and major Subcontractors. C Agenda: 1. Use of premises by Owner and Contractor 2. Safety and first aid procedures 3. Construction controls provided by Owner 4. Temporary utilities 5. Survey and layout 6. Security and housekeeping procedures 1.07 PROGRESS MEETINGS A Progress Meetings shall be held at Project Site or other location as designated by the Engineer. Meeting shall be held at monthly intervals, or more frequent intervals if directed by Engineer. B Attendance Required: Job superintendent, major Subcontractors and suppliers, Engineer representatives, and Consultants as appropriate to agenda topics for each meeting. C Engineer or City's representative will make arrangements for meetings,and recording minutes. D Engineer or City's representative will prepare the agenda and preside at meetings. 02/2008 01310-2 of 3 CITY OF PEARLAND COORDINATION AND MEETINGS Csb.\ E Contractor shall provide required information and be prepared to discuss each agenda item. F Agenda: 1. Review minutes of previous meeting. 2. Review of Construction Schedule, Applications for Payment,payroll and compliance submittals. 3. Field observations, problems, and decisions. 4. Identification of problems which impede planned progress. 5. Review of Submittal Schedule and status of submittals. 6. Review status of Requests for Information, Requests for Proposal. 7. Review status of Change Orders. 8. Review of off-site fabrication and delivery schedules. 9. Maintenance of updates to Construction Schedule. 10. Corrective measures to regain projected schedules. 11. Planned progress during succeeding work period. 12. Coordination of projected progress. 13. Maintenance of quality and work standards. 14. Effect of proposed changes on Construction Schedule and coordination. 15. Other items relating to the Work. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 02/2008 01310-3 of 3 CITY OF PEARLAND SUBMITTALS Section 01350 SUBMITTALS 1.0 GENERAL This Section contains general lists of Submittals and Technical Specifications that may be required for the Work. When Submittals are required elsewhere in these Technical Specifications,refer to this Section for Submittal requirements and procedures. 1.01 SECTION INCLUDES A Submittal procedures for: 1. Schedule of Values 2. Construction Schedules 3. Shop Drawings,Product Data, and Samples 4. Operations and Maintenance Data 5. Manufacturer's Certificates 6. Construction Photographs 7. Project Record Documents 8. Design Mixes B References to the following Technical Specifications: 1. Section 01310—Coordination&Meetings 2. Section 01630—Product Options &Substitutions 3. Section 01100—Summary of Work 4. Section 01380—Construction Photographs 5. Section 01760—Project Record Documents 6. Section 02530—Gravity Sanitary Sewers 1.02 SUBMITTAL PROCEDURES A Scheduling and Handling 1. Schedule Submittals well in advance of the need for material or equipment for construction. Allow time to make delivery of material or equipment after Submittal is approved. 2. Develop a Submittal Schedule that allows sufficient time for initial review, correction,resubmission and final review of all submittals.The Engineer will review and return submittals to the Contractor as expeditiously as possible but the amount of time required for review will vary depending on the complexity and quantity of data submitted. In no case will a Submittal Schedule be acceptable which allows less than 30 days for initial review by the Engineer. This time for review shall in no way be justification for delays or additional compensation to the Contractor. 3. The Engineer's review of submittals covers conformity to the Plans,Technical Specifications, and dimensions which affect the layout. The Contractor is responsible for quantity determination. The Contractor is responsible for any errors, omissions or deviations from the Contract requirements; review of 01/2008 01350- 1 of 6 CITY OF PEARLAND SUBMITTALS submittals in no way relieves the Contractor from his obligation to furnish required items according to the Plans and Technical Specifications. 4. Submit 5 copies of documents unless otherwise specified in this Section or by individual Technical Specifications. 5. Revise and resubmit submittals as required. Identify all changes made since previous submittal. 6. The Contractor shall assume the risk for material or equipment which is fabricated or delivered prior to approval. No material or equipment shall be incorporated into the Work or included in Applications for Payment until approval has been obtained in the specified manner. B Transmittal Form and Numbering 1. Transmit each submittal to the Engineer with a transmittal form. 2. Sequentially number each transmittal form beginning with the number 1. Re- Submittals shall use the original number with an alphabetic suffix(i.e.,2A for first Re-Submittal of Submittal 2 or 15C for third Re-Submittal of Submittal 15). Each submittal shall only contain one type of work, material, or equipment. Mixed submittals will not be accepted. 3. Identify variations from requirements of Contract Documents and identify product or system limitations. 4. For submittal numbering of video tapes, see this Section, 1.10"Video". C Contractor's Certification 1. Each submittal shall contain a statement or stamp signed by the Contractor, certifying that the items have been reviewed in detail and are correct and in accordance with Contract Documents, except as noted by any requested variance. 1.03 SCHEDULE OF VALUES A Submit a Schedule of Values at least 10 days prior to the first Application for Payment. A Schedule of Values shall be provided for each of the items indicated as Lump Sum (LS) in Section 00300 - Bid Proposal for which the Contractor requests to receive Progress Payments. B Schedule of Values shall be typewritten on 8-1/2"x 11",plain bond,white paper. Use the Table of Contents of this Project Manual as a format for listing costs of Work by Section. C Round off figures for each listed item to the nearest$100.00 except for the value of one item, if necessary, to make the total price for all items listed in the Schedule of Values equal to the applicable Lump Sum in Section 00300—Bid Proposal. D For Unit Price Contracts, items should include a proportional share of Contractor's overhead and profit, such that the total of all items listed in the Schedule of Values equals the Contract amount. For Stipulated Price Contracts,Mobilization,Bonds,and Insurance may be listed as separate items in the Schedule of Values. 01/2008 01350-2 of 6 CITY OF PEARLAND SUBMITTALS E For Lump Sum equipment items, where Submittals for Testing, Adjusting, and Balancing Reports in conjunction with Operation and Maintenance Data are required, include a separate item for equipment Operation and Maintenance Data Submittals and a separate item for Submittals of equipment Testing, Adjusting, and Balancing Reports, each valued at five (5)percent of the Lump Sum. F Revise the Schedule of Values and resubmit for items affected by contract modifications,Change Orders,and Work Change Directives. Submit revised Schedule of Values 10 days prior to the first Application for Payment after the changes are approved by the Engineer. 1.04 CONSTRUCTION SCHEDULES A Submit Construction Schedules for the Work in accordance with the requirements of this Section. The Construction Schedule Submittal shall be,at a minimum,a bar chart, (computer generated or prepared manually) and a narrative report. B During the Preconstruction Meeting, as noted in Section 01310 - Coordination and Meetings, the Contractor shall provide a sample of the format to be used for the Construction Schedule Submittal. The format is subject to approval by the Engineer. Review of the Submittal will be provided within 7 days of the Submittal of the sample. C Within 7 days of the receipt of approval of the Contractor's format, or 14 days of the Notice to Proceed, whichever is later, the Contractor shall submit a proposed Construction Schedule for review. The Construction Schedule Submittal shall meet the following requirements: 1. The Construction Schedule shall usually include a total of at least 20 but not more than 50 activities. Fewer activities may be accepted,if approved by the Engineer. 2. For Projects with work at different physical locations,each location should be indicated separately within the Construction Schedule. 3. For projects with multiple crafts or significant subcontractor components,these elements should be indicated separately within the Construction Schedule. 4. For Projects with multiple types of tasks within the scope,these types of work should be indicated separately within the Construction Schedule. 5. For Projects with significant major equipment items or materials worth over 25 percent of the Total Contract Price, the Construction Schedule shall indicate dates when these items are to be purchased,when they are to be delivered,and when installed. 6. For Projects where operating plants are involved, each period of work which will require the shut down of any process or operation shall be identified in the Construction Schedule and must be agreed to by the Engineer prior to starting work in the area. 7. A Billing Schedule(tabulation of the estimated monthly billings)for the Work shall be prepared and submitted by the Contractor with the first Construction Schedule. This information is not required in the monthly updates, unless significant changes in Work require re-submittal of the Construction Schedule for review. The total for each month and a cumulative total will be indicated. 01/2008 01350-3 of 6 CITY OF PEARLAND SUBMITTALS These monthly forecasts are only for planning purposes of the Engineer. Monthly payments for actual work completed will be made by the Engineer in accordance with Section 00700- General Conditions of Agreement. D The Contractor must receive approval of the Engineer for the Construction Schedule and Billing Schedule prior to,the first monthly Application for Payment. No payment will be made until these are accepted. E Upon written request from the Engineer, the Contractor shall revise and submit for approval all or any part of the Construction Schedule to reflect changed conditions in the Work or deviations made from the original plan and schedule. F The Contractor's Construction Schedule shall thereafter be updated with the Actual Start and Actual Finish Dates, Percent Complete, and Remaining Duration of each Activity and submitted monthly. The date to be used in updating the monthly Construction Schedule shall be the same Date as is used in the monthly Application for Payment. This monthly update of the Construction Schedule shall be required before the monthly Application for Payment will be processed for payment. G The narrative Construction Schedule Report shall include a description of changes made to the Construction Schedule; Activities Added to the Construction Schedule; Activities Deleted from the Construction Schedule; any other changes made to the Construction Schedule other than the addition of Actual Start Dates and Actual Finish Dates and Remaining Durations. 1.05 SHOP DRAWINGS,PRODUCT DATA,AND SAMPLES A Shop Drawings 1. Submit Shop Drawings for review as required by the Technical Specifications. 2. Contractor's Certification, as described in this Section, 1.02 "Submittal Procedures" shall be placed on each Shop Drawing. 3. The Shop Drawing shall accurately and distinctly present the following: a. Field and erection dimensions clearly identified as such. b. Arrangement and section views. c. Relation to adjacent materials or structure including complete information for making connections between work under this Contract and work under other contracts. d. Kinds of materials and finishes. e. Parts list and descriptions. f. Assembly Shop Drawings of equipment components and accessories showing their respective positions and relationships to the complete equipment package. g. Where necessary for clarity, identify details by reference to sheet numbers and detail numbers, schedule or room numbers as shown on the Plans. 4. Shop Drawing Drawings shall be to scale,and shall be a true representation of the specific equipment or item to be furnished. 01/2008 01350-4 of 6 CITY OF PEARLAND SUBMITTALS B Product Data 1. Submit Product Data for review when required in individual Technical Specifications. 2. Contractor's Certification, as described in this Section, 1.02 "Submittal Procedures" shall be placed on each data item submitted. 3. Mark each copy to identify applicable products,models,options to be used in this Project. Supplement manufacturers'standard data to provide information unique to this Project, where required by the Technical Specification. 4. For products specified only by reference standard,submit manufacturer,trade name,model or catalog designation, and applicable reference standard. 5. For Approved Products, those designated in the Technical Specifications followed by the words"or approved equal",submit manufacturer,trade name, model or catalog designation, and applicable reference standard. 6. For products proposed as alternates to Approved Products, refer to Section 01630-Product Options and Substitutions, 1.04"Selection Options"and 1.07 "Substitution Procedures". 7. For products that are neither Pre-Approved, Approved, specified only by reference standard, nor proposed as alternates, submit product description, trade name, manufacturer, and supplier. Contractor shall provide additional information upon written request by Engineer or Owner. C Samples 1. Submit samples for review as required by the Technical Specification. 2. Contractor's Certification, as described in this Section, 1.02 "Submittal Procedures", shall be placed on each sample or a firmly attached sheet of paper. 3. Submit the number of samples specified in the Technical Specification;one of which will be retained by the Engineer. 4. Reviewed samples which may be used in the Work are identified in the Technical Specifications. 1.06 OPERATIONS AND MAINTENANCE DATA A When specified in Technical Specification,submit manufacturers'printed instructions for delivery, storage, assembly, installation, start-up, operation, adjusting, finishing, and maintenance. B Contractor's Certification, as described in this Section. 1.02"Submittal Procedures", shall be placed on front page of each document. C Identify conflicts between manufacturers'instructions and Contract Documents. 1.07 MANUFACTURER'S CERTIFICATES A When specified in Technical Specification, submit manufacturers' certificate of compliance for review by Engineer. B Contractor's Certification, as described in this Section, 1.02"Submittal Procedures", J shall be placed on front page of the certificate. 01/2008 01350-5 of 6 CITY OF PEARLAND SUBMITTALS C Submit supporting reference data, affidavits, and certifications as appropriate. D Manufacturer's Certificates- may be recent or previous test results on material or product, but must be acceptable to Engineer. 1.08 CONSTRUCTION PHOTOGRAPHS A Submit photographs in accordance with Section 01380—Construction Photographs. 1. Prints: Prepare 2 prints of each view and submit 1 print directly to the City's Representative within 7 days of taking photographs. One print shall be retained by the Contractor and made available at all times for reference on the job site. B PRECONSTRUCTION PHOTOGRAPHS: 1. Prior to the commencement of any construction,take digital color photographs on the entire route of the project 2. Photographs: Two prints, color, matte finish; 3 x 5 inch size, mounted on 81 x 11-inch soft card stock, with left edge binding margin for three hole punch, or in plastic pockets in three-ring notebook. 3. Th photographs shall show: a. Date photographs were taken b. Location of the photograph, house number and street name. (This information may be shown on a chalk board in the photograph by a label on the mountings.) 4. Photographs should show the condition of the following a. Esplanades and boulevards b. Yards (near, side and far side of street) c. Housewalk, sidewalk and driveway; curb d. Area between walk and curb 1) Particular features(yard lights, shrubs,fences, trees, etc.) 2) Landscaping and decorative features. C POST CONSTRUCTION PHOTOGRAPHS 1. On completion of construction, provide photographs of any public or private property which has been repaired or restored and any damage which is or may be the subject of complaints. 1.09 PROJECT RECORD DOCUMENTS A Submit Project Record Documents in accordance with Section 01760—Project Record Documents. 1.10 VIDEO A Submit television video in DVD format as required in individual Technical Specifications. - B Transmittal forms for video disks shall be numbered sequentially beginning with TO1, T02,T03, etc. 01/2008 01350-6 of 6 CITY OF PEARLAND SUBMITTALS 1.11 DESIGN MIXES A When specified, submit design mixes for review. B Contractor's Certification, as described in this Section, 1.02"Submittal Procedures", shall be placed on front page of each design mix. C Mark each design mix to identify proportions,gradations,and additives for each class and type of design mix submitted. Include applicable test results on samples for each mix. D Maintain a copy of approved design mixes at mixing plant. 2.0 PRODUCTS - NotUsed 3.0 EXECUTION - NotUsed END OF SECTION 01/2008 01350-7 of 6 CITY OF PEARLAND CONSTRUCTION PHOTOGRAPHS CimiN Section 01380 CONSTRUCTION PHOTOGRAPHS 1.0 GENERAL 1.01 SECTION INCLUDES A Requirements for construction photographs and submittals. B References Technical Specifications: 1. Section 01100—Summary of Work 2. Section 01350—Submittals 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item, no separate payment will be made for Construction Photographs under this Section. Include cost in Bid Items for installed Work. 1.03 SUBMITTALS A When required by Section 01100. — Summary of Work, submit photographs in accordance applicable provisions of this Section. (11116'\ B Make Submittals required by this and related Sections under the provisions of Section 01350—Submittals. C Prepare three(3)prints of each view and submit two(2) prints directly to the Project Manager within seven(7)days of taking photographs. One(1)print shall be retained by the Contractor in the field office at the Project Site and available at all times for reference. D When requested by the Project Manager, the Contractor shall submit extra prints of photographs,for distribution directly to designated parties who will pay the costs for the extra prints directly to the photographer. E When required by individual Sections, submit photographs taken prior to start of the Work to show original Project Site conditions. F When required by Contract Documents, submit photographs with Application for Payment. G When required by individual Sections,submit photographs taken following completion of the Work to show the condition in which the Project Site will be left. H With each submittal,include photographic negatives in protective envelopes,identified by Project Name, Contractor, and date photographs were taken. 01/2008 01380- 1 of 3 CITY OF PEARLAND CONSTRUCTION PHOTOGRAPHS 1.04 QUALITY ASSURANCE A Contractor shall be responsible for the timely execution of the photographs, their vantage point, direction of shot, and quality. 2.0 PRODUCTS 2.01 PHOTOGRAPHS A Photographs shall be digital quality and shall be submitted on a CD. B The photographs shall show on a non-elective chalkboard or white board,readable in the photograph: 1. Job number. 2. Date and time photographs were taken. 3. Location of the photograph,house number and street, along with the project number. C Indicate the condition of the following: 1. Esplanades and boulevards. 2. Yards (near side and far side of street). 3. House-walk and sidewalk. 4. Curb. 5. Area between walk and curb. ^� 6. Particular features (yard lights, shrubs, fence, trees, etc.). 7. Date shall be on negative. 8. Provide notation of vantage point marked for location and direction of shot on a key plan of the Project Site. D Sufficient number of photographs shall be taken to show the existence or non- existence of cracked concrete and the condition of trees, shrubs and grass. E Identify each photograph with an applied label or rubber stamp on the back with the following information: 1. Name of the Project. 2. Name and address of the photographer(if a professional photographer is used). 3. Name of the Contractor. 4. Date the photograph was taken. 5. Photographs to be in plastic pockets and bound in three-ring notebook for easy access and viewing. 3.0 EXECUTION 3.01 PRECONSTRUCTION PHOTOGRAPHS A Prior to the commencement of the Work, take photographs of the entire route of the Project Site. 01/2008 01380-2 of 3 CITY OF PEARLAND CONSTRUCTION PHOTOGRAPHS 3.02 POST-CONSTRUCTION PHOTOGRAPHS A Following the completion of the Work,take photographs from corresponding vantage points and direction of shots. 3.03 PROGESS PHOTOGRAPHS A Take photographs at intervals, coinciding with the cutoff date associated with each Application for Payment and submit on CD with monthly Application for Payment. B Select the vantage points for each shot each month to best show the status of construction and progress since the last photographs were taken. Take not less than two (2) shots from the same vantage point creating a time-lapsed sequence. C Follow direction when given by the Project Manager in selecting vantage points. END OF SECTION 01/2008 01380-3 of 3 CITY OF PEARLAND REFERENCED STANDARDS ^� Section 01420 REFERENCED STANDARDS 1.0 GENERAL 1.01 SECTION INCLUDES A General quality assurance as related to Reference Standards and a list of references. B References to Technical Specifications: None 1.02 QUALITY ASSURANCE A For Products or workmanship specified by association, trade, or Federal Standards comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes. B Conform to reference standard by date of issue current on the date as stated in Section 00700—General Conditions of Agreement. C Request clarification from Engineer before proceeding should specified reference standards conflict with Contract Documents. 1.03 SCHEDULE OF REFERENCES AASHTO American Association of State Highway and Transportation Officials 444 North Capitol Street,N.W. Washington,DC 20001 ACI American Concrete Institute P.O. Box 19150 Reford Station Detroit,MI 48219-0150 AGC Associated General Contractors of America 1957 E Street, N.W. Washington,DC 20006 AI Asphalt Institute Asphalt Institute Building College Park,MD 20740 AITC American Institute of Timber Construction 333 W. Hampden Avenue Englewood, CO 80110 02/2008 01420- 1 of 5 CITY OF PEARLAND REFERENCED STANDARDS AISC American Institute of Steel Construction 400 North Michigan Avenue, Eighth Floor Chicago, IL 60611 AISI American Iron and Steel Institute 1000 16th Street,N.W. Washington, DC 20036 ASME American Society of Mechanical Engineers 345 East 47th Street New York,NY 10017 ANSI American National Standards Institute 1430 Broadway New York,NY 10018 APA American Plywood Association Box 11700 Tacoma,WA 98411 API American Petroleum Institute 1220 L Street,N.W. CIlb.\ Washington,DC 20005 AREA American Railway Engineering Association 50 F Street,N.W. Washington,DC 20001 ASTM American Society for Testing and Materials 1916 Race Street Philadelphia, PA 19103. AWPA American Wood-Preservers'Association 7735 Old Georgetown Road Bethesda,MD 20014 AWS American Welding Society P.O. Box 35104 Miami,FL 33135 AWWA American Water Works Association 6666 West Quincy Avenue Denver, CO 80235 02/2008 01420-2 of 5 CITY OF PEARLAND REFERENCED STANDARDS CLFMI Chain Link Fence Manufacturers Institute 1101 Connecticut Avenue, N.W. Washington,DC 20036 CRD U.S.A. Corps of Engineers Code of Ordinances City of Pearland 3519 Liberty Drive Pearland, TX 77581 CRSI Concrete Reinforcing Steel Institute 933 Plum Grove Road Schaumburg, IL 60173-4758 EJMA Expansion Joint Manufacturers Association 707 Westchester Avenue White Plains,NY 10604 FDA U.S. Food and Drug Administration 5600 Fisher Lane Rockville, MD 20857-0001 FS Federal Standardization Documents General Services Administration, Specifications Unit(WFSIS) 7th and D Street S.W. Washington,DC 20406 ICEA Insulated Cable Engineer Association P.O. Box 440 S. Yarmouth, MA 02664 IEEE Institute of Electrical and Electronics Engineers 445 Hoes Lane P.O. Box 1331 Piscataway,NJ 0855-1331 MIL Military Specifications General Services Administration, Specifications Unit(WFSIS) 7th and D Street S.W. Washington,DC 20406 NACE National Association of Corrosion Engineers P. O. Box 986 Katy, TX 77450 02/2008 01420-3 of 5 CITY OF PEARLAND REFERENCED STANDARDS (1.1b\ NEMA National Electrical Manufacturers'Association 2101 L Street,N.W., Suite 300 Washington,DC 20037 NFPA National Fire Protection Association Batterymarch Park,P.O. Box 9101 Quincy,MA 02269-9101 OSHA Occupational Safety Health Administration U.S. Department of Labor, Government Printing Office Washington,DC 20402 PCA Portland Cement Association 5420 Old Orchard Road Skokie, IL 60077-1083 PCI Prestressed Concrete Institute 201 North Wacker Drive Chicago, IL 60606 SDI Steel Deck Institute Box 9506 Canton, OH 44711 SSPC Steel Structures Painting Council 4400 Fifth Avenue Pittsburgh,PA 15213 TAC Texas Administrative Code TCEQ Texas Commission on Environmental Quality P. O. Box 13087 Austin, TX 78711-3087 TxDOT Texas Department of Transportation 125 East 11th Street Austin,TX 78701-2483 Texas MUTCD Texas Manual on Uniform Traffic Control Devices (2003 Adoption) (published by Texas Department of Transportation) UL Underwriters'Laboratories,Inc. 333 Pfingston Road Northbrook, IL 60062 UNI-BELL UNI-BELL Pipe Association 2655 Villa Creek Drive, Suite 155 02/2008 01420-4 of 5 CITY OF PEARLAND REFERENCED STANDARDS Dallas, TX 75234 WRI Wire Reinforcement Institute 942 Main Street—Suite 300 Hartford, CT 06103 WWD/PI Water Well Drillers and Pump Installers Advisory Council Texas Department of Licensing and Regulation P.O. Box 12157 Austin, TX 78711 2.0 PRODUCTS - NotUsed 3.0 EXECUTION - NotUsed END OF SECTION 02/2008 01420-5 of 5 CITY OF PEARLAND CONTRACTOR'S QUALITY CONTROL \ ' Section 01430 CONTRACTOR'S QUALITY CONTROL 1.0 GENERAL 1.01 SECTION INCLUDES A Quality assurance and control of installation and manufacturer's field services and reports. B References to Technical Specifications: 1. Section 01350—Submittals 1.02 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350— Submittals. 1.03 QUALITY ASSURANCE/CONTROL OF INSTALLATION A Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce the Work of specified quality at no additional cost to the Owner. (11116\ B Comply fully with manufacturers' installation instructions, including each step in sequence. C Request clarification from Project Manager before proceeding should manufacturers' instructions conflict with Contract Documents. D Comply with specified Standards as minimum requirements for the Work except when more stringent tolerances,codes,or specified requirements indicate higher standards or more precise workmanship. E Perform work by persons qualified to produce the specified level of workmanship. F Obtain copies of Standards and maintain at Project Site when required by individual Technical Specifications. 1.04 MANUFACTURERS' FIELD SERVICES AND REPORTS A When specified in individual Technical Specifications, provide material or product suppliers' or manufacturers' technical representative to observe site conditions, conditions of surfaces and installation,quality of workmanship,start-up of equipment, operator training,test, adjust, and balance of equipment as applicable, and to initiate operation,as required. Conform to minimum time requirements for start-up operations and operator training if defined in Technical Specifications. (111.b\ 02/2008 01430- 1 of 2 CITY OF PEARLAND CONTRACTOR'S QUALITY CONTROL �y B At the Project Manager's request, submit qualifications of manufacturer's representative to Project Manager fifteen (15) days in advance of required representative's services. The representative shall be subject to approval of Project Manager. C Manufacturer's representative shall report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers'written instructions. Submit report within one(1)day of observation to Project Manager for review. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 02/2008 01430-2 of 2 CITY OF PEARLAND OBSERVATION SERVICES Section 01440 OBSERVATION SERVICES 1.0 GENERAL 1.01 SECTION INCLUDES A Observation services and references. B References to Technical Specifications: 1. Section 01450—Testing Laboratory Services 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 INSPECTION A Project Manager will appoint an Observer as a representative of the Owner to oversee inspections,tests,and other services specified in individual Technical Specifications. B Alternately, Project Manager may appoint, employ, and pay an independent firm to provide additional observation or construction management services as indicated in Section 01450—Testing Laboratory Services. C Reports will be submitted by the independent firm to Project Manager,Engineer,and Contractor, indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents. D Contractor shall assist and cooperate with the Observer;furnish samples of materials, design mix, equipment,tools, and storage. E Contractor shall notify Project Manager 24 hours prior to expected time for operations requiring services. Notify Engineer and independent firm when noted. F Contractor shall sign and acknowledge report for Observer. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 09/2009 01440- 1 of 1 CITY OF PEARLAND TESTING LABORATORY SERVICES Section 01450 TESTING LABORATORY SERVICES 1.0 GENERAL 1.01 SECTION INCLUDES A Testing Laboratory Services and Contractor responsibilities related to those services. B References to Technical Specifications: 1. Section 01350—Submittals C Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM D 3740, "Practice for Evaluation of Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction" b. ASTM E 329, "Recommended Practice for Inspection and Testing Agencies for Concrete, Steel, and Bituminous Materials as Used in Construction" 1.02 SELECTION AND PAYMENT A Owner will select,employ,and pay for services of an independent testing laboratory to 7 perform inspection and testing identified in individual Technical Specifications. B Employment of testing laboratory shall not relieve Contractor of obligation to perform work in accordance with requirements of Contract Documents. C Owner or designated representative shall schedule and monitor testing as required to provide timely results and to avoid delay to the Work. D Contractor shall be responsible for paying for services of commercial testing laboratory, with prior approval of Owner, to perform the following: 1. Pipe diameter deflection tests on all flexible and semi-rigid sanitary sewer collection system pipe installation 2. Laboratory services required to establish mix design proposed for use for Portland cement concrete, asphaltic concrete mixtures and other material mixes requiring control by testing laboratory when required because of change in source of materials or other conditions not caused by Owner. 3. Tests required to establish optimum moisture of earth and base materials and to determine required compactive effort to meet density requirements. 4. Cores to test for thickness. 5. Testing and inspection performed for the Contractor's convenience. 6. Retesting and repetitions of laboratory services when initial tests indicate work does not comply with requirements of Contract Documents. 04/2008 01450- 1 of 3 CITY OF PEARLAND TESTING LABORATORY SERVICES 1.03 LABORATORY REPORTS A The Engineer will receive 1 copy,the Project Manager will receive 2 copies, and the Contractor will receive 2 copies of Laboratory Reports from the testing laboratory. One of the Contractor's copies shall remain at the Project Site for duration of Project. Test results which indicate non-conformance shall be transmitted immediately via fax from the testing laboratory to the Contractor and Project Manager. 1.04 LIMITS ON TESTING LABORATORY AUTHORITY A Laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents. B Laboratory may not approve or accept any portion of the Work. C Laboratory may not assume any duties of Contractor. D Laboratory has no authority to stop the Work. 1.05 CONTRACTOR RESPONSIBILITIES A Notify Project Manager and laboratory 24 hours prior to expected time for operations requiring inspection and testing services. Notify Engineer if specification section requires the presence of the Engineer. B Cooperate with laboratory personnel in collecting samples to be tested or collected on Project Site. C Provide access to the Work and to manufacturer's facilities. D Provide samples to laboratory in advance of their intended use to allow thorough examination and testing. E Provide incidental labor and facilities for access to the Work to be tested;to obtain and handle samples at the site or at source of products to be tested; and to facilitate tests and inspections including storage and curing of test samples. F Arrange with laboratory and pay for: 1. Retesting required for failed tests. 2. Retesting for nonconforming Work. 3. Additional sampling and tests requested by Contractor for his own purposes. 2.0 PRODUCTS - Not Used 3.0 EXECUTION 04/2008 01450-2 of 3 CITY OF PEARLAND TESTING LABORATORY SERVICES 3.01 CONDUCTING TESTING A Laboratory sampling and testing shall conform to ASTM D 3740 and ASTM E 329,as well as other test standards specified in individual Technical Specifications. END OF SECTION 04/2008 01450-3 of 3 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS Section 01500 TEMPORARY FACILITIES AND CONTROLS 1.0 GENERAL 1.01 SECTION INCLUDES A Temporary facilities and the necessary controls for the Work including utilities, telephone, sanitary facilities, field office, storage sheds and building, safety requirements,first aid equipment,fire protection,security measures,protection of the Work and property, access roads and parking, environmental controls, disposal of trash,debris,and excavated material,pest and rodent control,water runoff and erosion control. B References to Technical Specifications: Section 00200—Instructions to Bidders Section 01100—Summary of Work Section 01350—Submittals Section 01566—Source Controls for Erosion& Sedimentation Section 01100—Summary of Work Section 01600—Material&Equipment Section 01570—Trench Safety System Section 01555 —Traffic Control &Regulation Section 01720—Field Surveying Section 01563 —Tree&Plant Protection Section 01564—Control of Ground Water& Surface Water Section 13730-Computer Equipment C Referenced Standards: Occupational Safety and Health Administration(OSHA) National Fire Protection Association (NFPA) Code of Ordinances, City of Pearland,Texas D Definitions: Underground Structures - sewer, water, gas, and other piping, and manholes, chambers, electrical and signal conduits, tunnels, and other existing subsurface installations located within or adjacent to the limits of the Work. Surface Structures -existing buildings, structures and other constructed installations above the ground surface. Included with such structures are their foundations or any extension below the surface. Surface structures include, but are not limited to 12-2-2011 01500- 1 of 10 CITY OFPEARLAND TEMPORARY FACILITIES AND CONTROLS buildings,tanks,walls, bridges, roads, dams, channels, open drainage, piping, poles, 7 wires, posts, signs, markers, curbs, walks, guard cables, fencing, and other facilities that are visible above the ground surface. 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1.04 CONTRACTOR'S RESPONSIBILITY A The facilities and controls specified in this Section are considered minimum for the Work. The Contractor may provide additional facilities and controls for the proper execution of the Work and to meet Contractor's responsibilities for protection of persons and property. B Comply with applicable requirements specified in other Technical Specifications. Maintain and operate temporary facilities and systems to assure continuous service. Modify and extend systems as Work progress requires. Completely remove temporary materials and equipment when their use is no longer required. Restore existing facilities used for temporary services to specified or to original condition. 1.05 TEMPORARY UTILITIES A Temporary Service Make arrangements with utility service companies for such temporary services as are necessary to construct the work and manage the site. Abide by rules and regulations of the utility service companies or authorities having jurisdiction. Be responsible for utility service costs until the Work is Substantially Complete. Included are fuel,power,light,heat,and other utility services necessary for execution, completion, testing, and initial operation of the Work. B Water Provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices, or for other use as required for proper completion of the Work. 12-2-2011 01500-2 of 10 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS (111b'' For water to be drawn from public water supply, obtain special permit or license and meter from the proper City officials. For facilities under construction, establish a water/sewer billing account with City's Utility Billing Department.A deposit based on rates established by latest ordinance will be required. For water drawn from fire hydrants, apply for and receive a construction water meter from City'Public Works Department. Identify specific location for construction water meter installation. Once installed,water meter may not be moved without notification of Public Works Department.Install backflow preventer on fire hydrant supply if not included in City provided meter. Provide and maintain an adequate supply of potable water for domestic consumption by Contractor personnel. C Electricity and Lighting 1 Provide temporary electric power service in Contractor's name, as required for the prosecution of the Work, including testing of Work. Provide power for lighting, operation of the Contractor's equipment, or for any other use by Contractor or as necessary to maintain any of Owner's on-going operations as may continue on the site during any scheduled shutdown. Minimum lighting level shall be 5 foot-candles for open areas; 10 foot-candles for stairs and shops. 2 Provide permanent electric power service,in the Contractor's name,to the work or site as and when required by the schedule of the work to achieve Substantial Completion or Partial Substantial Completion.Contractor to establish service billing in its name and transfer service and billing to the Owner upon acceptance of the work as Substantially Complete and suitable for beneficial occupancy.by the Owner. D Natural Gas Provide and pay for natural gas service to the work as and when required by the schedule to achieve Substantial Completion. Contractor to establish service billing in its name and transfer service and billing to the Owner upon acceptance of the work as Substantially Complete and suitable for beneficial occupancy by the Owner. E Temporary Heat and Ventilation Provide temporary heat as necessary for protection or completion of the Work. Provide temporary heat and ventilation to assure safe working conditions; maintain enclosed areas at a minimum of 50 degrees F. F Telephone Provide emergency telephone service at the Project Site for use by Contractor personnel and others performing work or furnishing services. G Sanitary Facilities Provide and maintain sanitary facilities for persons on the Project Site,in compliance with federal, state, and local regulations. Locate toilets on the Project Site near the 12-2-2011 01500-3 of 10 CITY OFPEARLAND TEMPORARY FACILITIES AND CONTROLS work and secluded from view insofar as possible. Keep toilets clean and supplied throughout the course of the Work. Enforce the use of sanitary facilities by construction personnel at the Project Site. Such facilities shall be enclosed. Pit-type toilets will not be permitted. No discharge will be allowed from these facilities. Collect and store sewage and waste so as not to cause a nuisance or health problem; have sewage and waste hauled off-site and properly disposed in accordance with local regulations. Control areas where sanitary facilities are located in conformance with Section 01566 —Source Controls for Erosion& Sedimentation. 1.06 FIELD OFFICE A Provision of a Field Office and other specific temporary facilities as required in paragraph B below UNLESS otherwise stated in Section 00800 - Special Conditions of the Agreement,or Section 01100—Summary of Work. Provide for transportation,move-in, set-up,tie-down and,when project is complete,removal and move-out. The Contractor shall confirm location of office and other temporary facilities with Owner's Representative at Pre-Construction Meeting prior to delivery and set up. Location of temporary facilities shall be approved by the Owner's Representative by way of the submittal process. B. At a minimum, the Contractor's field office shall provide for, contain or serve to: provide a secured space for project administrative operations, periodic progress meetings,on-site storage for project files and plans,office space for CONTRACTOR's field supervisory personnel and provide a separate securable office space for OWNER's Representative including: meeting table and chairs, a single two drawer filing cabinet,a built-in drawing table and plan holders. Provide electric lighting and HVAC to the mobile office. 1. Field Office shall provide for, at a minimum, a high speed internet connection for use by Owner's Representative or Construction Manager as controlled by Paragraph A above. 1.07 STORAGE OF MATERIALS A Provide for storage of materials under the provisions of Section 01600—Material & Equipment. 1.08 SAFETY REQUIREMENTS A Contractor shall prepare, submit and follow a Safety Program that complies with federal, state, and local safety codes, statutes, and practices. Include in the Safety Program documented response to excavation, embankment, and trench safety requirements as specified in Section 01570—Trench Safety System. B Conduct operations in strict accord with applicable federal,state and local safety codes and statutes and with good construction practice. The Contractor is fully responsible and obligated to establish and maintain procedures for safety of all work, personnel n and equipment involved in the Work. 12-2-2011 01500-4 of 10 CITY OFPEARLAND TEMPORARY FACILITIES AND CONTROLS C Observe and comply with Texas Occupational Safety Act (Art. 5182a, V.C.S.) and with all safety and health standards promulgated by Secretary of Labor under Section 107 of Contract Work Hours and Standards Act, published in OSHA Standards -29 CFR, Part 1926, and adopted by Secretary of Labor under the Williams-Steiger Occupational Safety and Health Act of 1970, and to any other legislation enacted for safety and health of Contractor employees. Such safety and health standards apply to subcontractors and their employees as well as to the Contractor and its employees. D Observance of and compliance with the regulations shall be solely and without qualification the responsibility of the Contractor without reliance or superintendence of or direction by the Engineer or the Engineer's representative. Immediately advise the Engineer of investigation or inspection by Federal Safety and Health inspectors of the Contractor or subcontractor's work or place of work on the Project Site under this Contract,and after such investigation or inspection,advise the Engineer of the results. Submit one copy of accident reports to Engineer within ten (10) days of occurrence. E Protect areas occupied by workmen using the best available devices for detection of lethal and combustible gases. Test such devices frequently to assure their functional capability. Constantly observe infiltration of liquids into the Work area for visual or odor evidence of contamination. Take immediate and appropriate steps to seal off entry of contaminated liquids to the Work area. F Safety measures, including but not limited to safety personnel, first-aid equipment, ventilating equipment and safety equipment,in the Plans and Technical Specifications are obligations of the Contractor. G Maintain required coordination with the local Police and Fire Departments during the entire period covered by the Contract. 1.09 FIRST AID EQUIPMENT A Provide a first aid kit throughout the construction period. List telephone numbers for physicians, hospitals, and ambulance services in each first aid kit. B Have at least one person thoroughly trained in first aid procedures present on the Project Site whenever work is in progress. 1.10 FIRE PROTECTION A Fire Protection Standards. Conform to specified fire protection and prevention requirements as well as those that may be established by Federal, State, or local governmental agencies. B. Comply with all applicable provisions of NFPA Standard No. 241, Safeguarding Building Construction and Demolition Operations. Provide portable fire extinguishers, rated not less than 2A or 5B in accordance with NFPA Standard No. 10,Portable Fire Extinguishers,for each temporary building,and (11w for every. 3000 square feet of floor area of facilities under construction. 12-2-2011 01500-5 of 10 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS Locate portable fire extinguishers within 50 feet maximum from any point on the Project Site. C. Fire Prevention and Safety Measures. Prohibit smoking in hazardous areas. Post suitable warning signs in areas that are continuously or intermittently hazardous. Use metal safety containers for storage and handling of flammable and combustible liquids. Do not store flammable or combustible liquids in or near stairways or exits. Maintain clear exits from all points within a structure. 1.11 SECURITY MEASURES A Protect all materials, equipment, and property associated with the Work from loss, theft,damage,and vandalism. Contractor's duty to protect property includes Owner's property. B If existing fencing or barriers are breached or removed for purposes of construction, provide and maintain temporary security fencing equal to existing as approved by Owner's Representative. 1.12 PROTECTION OF PUBLIC UTILITIES A Prevent damage to existing public utilities during construction. These utilities are shown on the Plans at their approximate locations. Give owners of these utilities at least 48 hours notice before commencing Work in the area, for locating the utilities during construction,and for making adjustments or relocation of the utilities when they conflict with the proposed Work. 1.13 PROTECTION OF PEOPLE AND PROPERTY A Preventive Actions. Take precautions, provide programs, and take actions necessary to protect the Work and public and private property from damage. Take action to prevent damage, injury or loss, including, but not limited to, the following: a. Store apparatus,materials, supplies,and equipment in an orderly,safe manner that will not unduly interfere with progress of the Work or the Work of any other contractor, any utility service company, or the Owner's operations. b. Provide suitable storage for materials that are subject to damage by exposure to weather,theft, breakage, or otherwise. c. Place upon the Work or any part thereof only such loads as are consistent with the safety of that portion of the Work. d. Frequently clean up refuse,rubbish,scrap materials,and debris caused by construction operations, keeping the Work safe and orderly. 12-2-2011 01500-6 of 10 CITY OFPEARLAND TEMPORARY FACILITIES AND CONTROLS Climb' e. Provide safe barricades and guard rails around openings, for scaffolding, for temporary stairs and ramps, around excavations, elevated walkways, and other hazardous areas. Obtain written consent from proper parties before entering or occupying with workers, tools,materials or equipment,privately owned land except on easements provided for construction. Assume full responsibility for the preservation of public and private property on or adjacent to the site. If any direct or indirect damage is done by or on account of any act, omission, neglect, or misconduct in execution of the Work by the Contractor, it shall be restored by the Contractor to a condition equal to or better than that existing before the damage was done. B Barricades and Warning Signals. Where Work is performed on or adjacent to any roadway, right-of-way, or public place, furnish and erect barricades, fences, lights,warning signs, and danger signals; provide watchmen;and take other precautionary measures for the protection of persons or property and protection of the Work.Conform to Section 01555—Traffic Control& Regulation. C Preserving Control Points Maintain permanent benchmarks,public or private elevation or property demarcation (1111'' and control monumentation, or other reference points. Unless otherwise directed in writing, replace at no cost to the Owner,those monuments,property corners or other permanent demarcations that are damaged or destroyed in accordance with Section 01720—Field Surveying. D Tree and Plant Protection. Protect trees, shrubs, lawns,outside of grading limits and within the grading limits as designated on the Plans,and in accordance with requirements of Section 01563—Tree &Plant Protection. E Protection of Underground and Surface Structures Known underground structures, including water, sewer, electric, and telephone services are shown on the Plans in accordance with the best information available,but is not guaranteed to be correct or complete. Contractor is responsible for making Locate Calls. Explore ahead of trenching and excavation work and uncover obstructing underground structures sufficiently to determine their location, to prevent damage to them and to prevent interruption of utility services. Restore to original condition damages to underground structure at no additional cost to the Owner. Immediately notify the agency or company owning any existing utility which is damaged,broken,or disturbed. Obtain approval from the Engineer and agency for any repairs or relocations, either temporary or permanent. 12-2-2011 01500-7of10 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS Necessary changes in location of the Work may be made by the Engineer to avoid unanticipated underground structures. If permanent relocation of an underground structure or other subsurface installations is required and not otherwise provided for in the Contract Documents,the Engineer will direct Contractor in writing to perform the Work, which shall be paid for under the provisions for changes in the Contract Price as described in Section 00700—General Conditions of Agreement. Support in place and protect from direct or indirect injury to underground and surface structures located within or adjacent to the limits of the Work. Install such supports carefully and as required by the party owning or controlling such structure. Before installing structure supports,Contractor shall satisfy the Engineer that the methods and procedures to be used have been approved by the owner of the structure. Avoid moving or in any way changing the property of public utilities or private service corporations without prior written consent of a responsible official of that service or public utility. Representatives of these utilities reserve the right to enter within the limits of this project for the purpose of maintaining their properties,or of making such changes or repairs to their property that may be considered necessary by performance of this Contract. Notify the owners and/or operators of utilities and pipelines of the nature of construction operations to be performed and the date or dates on which those operations will be performed. When construction operations are required in the immediate vicinity of existing structures,pipelines,or utilities,give a minimum of five (5)working days advance notice. Probe and flag the location of underground utilities prior to commencement of excavation. Keep flags in place until construction operations reach and uncover the utility. Assume risks attending the presence or proximity of underground and surface structures within or adjacent to the limits to the Work including but not limited to damage and expense for direct or indirect injury caused by the Work to any structure. Immediately repair damage caused, to the satisfaction of the owner of the damaged structure. • 1.14 PROTECTION OF THE WORK Provide protection of installed products to prevent damage from subsequent operations. Remove protection facilities when no longer needed,prior to completion of the Work. Control traffic to prevent damage to equipment, materials, and surfaces. 1.15 ROADS AND PARKING A Prevent interference with traffic and Owner operations on existing roads. B Minimize use of existing streets and driveways by construction traffic. C Control traffic to prevent damage to equipment, materials, and surfaces. 12-2-2011 01500-8 of 10 CITY OFPEARLAND TEMPORARY FACILITIES AND CONTROLS (4111h\ D Construct and maintain temporary detours, ramps, and roads to provide for normal public traffic flow when use of public roads or streets is closed by necessities of the Work. E Provide mats or other means to prevent overloading or damage to existing roadways from tracked equipment or exceptionally large or heavy trucks or equipment F Designate temporary parking areas to accommodate construction personnel. When site space is not adequate, provide additional off-site parking. Locate as approved by Engineer. G Do not allow heavy vehicles or construction equipment unnecessarily in existing parking areas. 1.16 ENVIRONMENTAL CONTROLS A Provide and maintain methods, equipment, and temporary construction as necessary for controls over environmental conditions at the construction site and adjacent areas. B Comply with statutes,regulations,and ordinances which relate to the proposed Work for the prevention of environmental pollution and preservation of natural resources, including but not limited to the National Environmental Policy Act of 1969, PL 91- 190,Executive Order 11514. Provide, install and maintain storm water runoff control including but not limited to temporary entrance, silt fencing, etc. as specified in Contract Documents. D Recognize and adhere to the environmental requirements of the Project. Disturbed areas shall be strictly limited to boundaries established by the Contract Documents. Burning of rubbish, debris or waste materials is not permitted. 1.17 POLLUTION CONTROL A Provide methods,means,and facilities required to prevent contamination of soil,water or atmosphere by discharge of noxious substances from construction operations. B Provide equipment and personnel to perform emergency measures required to contain any spillage,and to remove contaminated soils or liquids. Excavate and dispose of any contaminated earth off-site, and replace with suitable compacted fill and topsoil. C Take special measures to prevent harmful substances from entering receiving streams or storm water conveyance systems in conformance with TPDES requirements and Section 01566—Source Controls for Erosion& Sedimentation. D Provide systems for control of atmospheric pollutants. Prevent toxic concentrations of chemicals. Prevent harmful dispersal of pollutants into the atmosphere. 12-2-2011 01500-9 of 10 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS E Use equipment during construction that conforms to current federal, state, and local laws and regulations. 1.18 PEST AND RODENT CONTROL A Provide rodent and pest control as necessary to prevent infestation of Project Site. B Employ methods and use materials which will not adversely affect conditions at the Project Site or adjoining properties. 1.19 NOISE CONTROL A Provide vehicles, equipment, and construction activities that minimize noise to the greatest degree practicable. Noise levels shall conform to OSHA Standards- 29 CFR and in no case will noise levels be permitted which create a nuisance in the surrounding neighborhoods. B Conduct construction operations during daylight hours from 7:30 a.m. to 6:00 p.m. except as approved by Engineer. C Comply with Chapter 19 NOISE, Codes of Ordinances, City of Pearland,Texas. 1.20 DUST CONTROL A Control objectionable dust caused by operation of vehicles and equipment under the provisions of Section 01566—Source Controls for Erosion& Sedimentation. 1.21 WATER RUNOFF AND EROSION CONTROL A Provide methods to control surface water,runoff,subsurface water,and water pumped from excavations and structures to prevent damage to the Work, the Project Site, or adjoining properties in accordance with Section 01564—Control of Ground Water& Surface Water and Section 01566—Source Controls for Erosion & Sedimentation. B Inspect earthwork periodically to detect any evidence of the start of erosion. Apply corrective measures as required to control erosion. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 12-2-2011 01500- 10 of 10 CITY OF PEARLAND MOBILIZATION Section 01505 MOBILIZATION 1.0 GENERAL 1.01 SECTION INCLUDES A Mobilization of construction equipment and facilities onto the Work. B Referenced Standards: 1. Texas Department of Transportation(TxDOT) 2. Texas Manual on Uniform Traffic Control Devices (Texas MUTCD) 1.02 MEASUREMENT AND PAYMENT A. Payment for Mobilization is on a Lump Sum basis and shall not exceed three percent(3%) of the total bid price. B. Payment for 50%of the Mobilization lump sum bid item may be included in the first monthly Application for Payment. Payment is subject to the receipt and approval by Engineer of the following items, as applicable: 1. Schedule of Values (Section 01350—Submittals) 2. Trench Safety Program (Section 01570—Trench Safety System) 3. Construction Schedule(Section 01350—Submittals) 4. Pre-construction Photographs (Section 01380—Construction Photographs) 5. Installation and acceptance of Project Identification Sign(s) (Section 01580—Project Identification Signs) 6. Installation and acceptance of TPDES requirements (Section 01565 - TPDES Requirements) C. Payment of the remaining 50 percent of the Contract Price for Mobilization is subject to completion of Temporary Facilities as specified in Section 01500, inclusive. D. Mobilization payments will be subject to Retainage as stipulated in Section 00700 General Conditions of Agreement. 2.0 PRODUCTS 2.01 PROJECT IDENTIFICATION SIGNS A. Provide specified number of project identification sign(s) per Section 01580. The name, address and contact information of the general contractor for the project shall be shown on the sign per Section 01580 and the attached exhibit. 09/2012 01505-1 of 1 CITY OF PEARLAND MOBILIZATION 3.0 EXECUTION 3.01 PLACEMENT OF PROJECT IDENTIFICATION SIGNS A. Place a Project Identification Sign as described in Section 01580, part 1.03,D visible to passing traffic or as directed by Engineer. END OF SECTION 09/2012 01505- 1 of 1 CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS (11.6.\ Section 01550 STABILIZED CONSTRUCTION EXITS 1.0 GENERAL 1.01 SECTION INCLUDES A Installation of erosion and sediment control for Stabilized Construction Exits used during construction and until final development of the Project site. B References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01562—Waste Material Disposal 3. Section 01566—Source Controls for Erosion &Sedimentation C Referenced Standards: 1. American Society of Testing and Materials (ASTM) a. ASTM D 4632, "Standard Test Method for Grab Breaking Load and Elongation of Geotextiles" 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required in this Section under the provisions of Section 01350 — Submittals. B Manufacturer's catalog sheets and other product data on Geotextile fabric. C Sieve analysis of aggregates conforming to requirements in this Section,2.02"Course Aggregates". 2.0 PRODUCTS 2.01 GEOTEXTILE FABRIC A Provide woven or non-woven geotextile' fabric made of either polypropylene, polyethylene, ethylene, or polyamide material. B By ASTM D 4632,geotextile fabric shall have a minimum grab strength of 270 psi any principal direction, and the equivalent opening size between 50 and 140. C Both the geotextile and threads shall be resistant to chemical attack,mildew, and rot and shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable life at a temperature range of 0°F to 120°F. 02/2008 01550- 1 of 4 CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS D Representative Manufacturers: Mirafi, Inc., Or-Equal. 2.02 COARSE AGGREGATES A Coarse aggregate shall consist of crushed stone,gravel,concrete,crushed blast furnace slag,or a combination of these materials. Aggregate shall be composed of clean,hard, durable materials free from adherent coatings,salt,alkali,dirt,clay,loam,shale,soft or flaky materials, or organic and injurious matter. B Course aggregates shall conform to the following gradation requirements. Sieve Size Percent Retained (Square Mesh) (by Weight) 21 " 0 2" 0-20 11 " 15 —50 3/4" 60-80 No. 4 95 - 100 3.0 EXECUTION 3.01 PREPARATION AND INSTALLATION A If necessary to keep the street clean of mud carried by construction vehicles and equipment, Contractor shall provide stabilized construction exits at the construction, staging,parking,storage,and disposal areas. Such erosion and sediment controls shall be constructed in accordance with the requirements shown on the Plans and specified in this Section. B Erosion and sediment control measures shall be in place prior to the start of any Work that exposes the soil, other than as specifically directed by the Engineer to allow soil testing and surveying. C Maintain existing erosion and sediment control systems located within the Project Site until acceptance of the Work or until directed by the Engineer to remove and discard the existing system. D Regularly inspect and repair or replace components of stabilized construction exits. Unless otherwise directed, maintain them until the Work is accepted by the Owner. Remove stabilized construction exits promptly when directed by the Engineer. Discard removed materials in accordance with Section 01562—Waste Material Disposal. E Equipment and vehicles shall be prohibited by the Contractor from maneuvering on areas outside of dedicated rights-of-way and easements for construction. Damage caused by construction traffic to erosion and sediment control systems shall be repaired immediately. 02/2008 01550-2 of 4 CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS F Conduct all construction operations under this Contract in conformance with the erosion control practices described in the Section 01566-Source Controls for Erosion &Sedimentation. 3.02 CONSTRUCTION METHODS - A Provide stabilized access roads, subdivision roads, parking areas, and other on-site vehicle transportation routes where shown on Plans. B Provide stabilized construction exits, and truck washing areas when approved by Engineer, of the sizes and locations where shown on Plans or as specified in this Section. C Vehicles leaving construction areas shall have their tires cleaned to remove sediment prior to entrance onto public right-of-way. When washing is needed to remove sediment, Contractor shall construct a truck washing area. Truck washing shall be done on stabilized areas which drain into a drainage system protected by erosion and sediment control measures. D Details for Stabilized Construction Exits are shown on the Plans. Construction of all other stabilized areas shall be to the same requirements. Roadway width shall be at least 14 feet for one-way traffic and 20 feet for two-way traffic and shall be sufficient for all ingress and egress. Furnish and place geotextile fabric as a permeable separator to prevent mixing of coarse aggregate with underlaying soil. Exposure of geotextile fabric to the elements between laydown and cover shall be a maximum of 14 days to minimize damage potential. E Roads and parking areas shall be graded to provide sufficient drainage away from stabilized areas. Use sandbags,gravel,boards,or similar methods to prevent sediment from entering public right-of-way,receiving stream or storm water conveyance system. F The stabilized areas shall be inspected and maintained daily. Provide periodic top dressing with additional coarse aggregates to maintain the required depth. Repair and clean out damaged control measures used to trap sediment. All sediment spilled, dropped, washed,or tracked onto public right-of-way shall be removed immediately. G The length of the stabilized area shall be as shown on the Plans, but not less than 50 feet. The thickness shall not be less than 8 inches. The width shall not be less than full width of all points of ingress or egress. H Stabilization for other areas shall have the same coarse aggregate,thickness,and width requirements as the stabilized construction exit,except where shown otherwise on the Plans. I Stabilized area may be widened or lengthened to accommodate truck washing area when authorized by Engineer. (1111111'\ 02/2008 01550-3 of 4 CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS J Alternative methods of construction may be utilized when shown on Plans, or when approved by the Engineer. These methods include the following: 1. Cement-Stabilized Soil, Compacted cement-stabilized soil or other fill material in an application thickness of at least 8 inches. 2. Wood Mats/Mud Mats - Oak or other hardwood timbers placed edge-to- edge and across support wooden beams which are placed on top of existing soil in an application thickness of at least 6 inches. 3. Steel Mats -Perforated mats placed across perpendicular support members. END OF SECTION 02/2008 01550-4of4 CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION Section 01555 TRAFFIC CONTROL AND REGULATION 1.0 GENERAL 1.01 SECTION INCLUDES A Requirements for traffic control plans,signs,signals,control devices,flares,lights and traffic signals, as well as construction parking control, designated haul routes and bridging of trenches and excavations. B Requirements for and qualifications of Flaggers. C References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01140—Contractor's Use of Premises D Referenced Standards: 1. Texas Manual on Uniform Traffic Control Devices (Texas MUTCD) 1.02 MEASUREMENT AND PAYMENT A Traffic Control and Regulation. Measurement is on a Lump Sum basis for Traffic Control and Regulation,including submittal of a traffic control plan if different from the one provided on the Plans, provision of traffic control devices, and provision of equipment and personnel as necessary to protect the Work and the public. The amount invoiced shall be determined based on the Schedule of Values submitted for traffic control and regulation. B Flaggers. Measurement is on a Lump Sum basis for Flaggers as required for the Work. The amount invoiced shall be determined based on the Schedule of Values submitted for Flaggers. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B A Traffic Control Plan responsive to the Texas MUTCD and sealed by a Registered Professional Engineer is incorporated into the Plans. If the Contractor proposes to implement traffic control different than the plan provided, he shall submit a Traffic Control Plan in conformance with Texas MUTCD for approval of the Engineer. C For both the Traffic Control Plan and Flaggers' use, submit Schedules of Values within 30 days following the Notice to Proceed. D Each week submit a daily log for Flaggers listing name,badge number,time start,time (11.'"\, finish, and hours worked. 03/2008 01555- 1 of 4 CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION 1.04 FLAGGERS A Unless otherwise specified, use only Flaggers who are off-duty,regularly employed, uniformed Peace Officers. B Flaggers are required at the following locations: 1. Where multi-lane vehicular traffic must be diverted into single-lane vehicular traffic. 2. Where vehicular traffic must change lanes abruptly. 3. Where construction equipment either enters or crosses vehicular traffic lanes and walks. 4. Where construction equipment may intermittently encroach on vehicular traffic lanes and unprotected walks and cross-walks. 5. Where construction activities might affect public safety and convenience. 6. Where traffic regulation is needed due to rerouting of vehicular traffic around the work site. 7. When requested by Owner. C The use of Flaggers is for the purpose of assisting in the regulation of traffic flow and movement, and does not in any way relieve the contractor of full responsibility for taking such other steps and provide such other Flaggers or personnel as the Contractor may deem necessary to protect the work and the public, and does not in any way relieve the Contractor of his responsibility for any damage for which he would otherwise be liable. Flaggers shall be used and maintained at such points for such periods of time as may be required to provide for the public safety and convenience of travel. 2.0 PRODUCTS 2.01 SIGNS,SIGNALS,AND DEVICES A Comply with Texas MUTCD regulations. B Traffic Cones and Drums, Flares and Lights: As approved by agencies having jurisdiction. 3.0 EXECUTION 3.01 PUBLIC ROADS A Abide by laws and regulations of governing authorities when using public roads. If the Contractor's work requires that public roads be temporarily impeded or closed, approvals shall be obtained from governing authorities and permits paid for before starting any work. Coordinate activities with the Engineer. B Contractor shall maintain at all times a 10-foot-wide all-weather lane adjacent to work areas which shall be kept free of construction equipment and debris and shall be for the use of emergency vehicles, or as otherwise provided in the Traffic Control Plan. 03/2008 01555-2 of 4 CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION C Contractor shall not obstruct the normal flow of traffic from 7:00 a.m.to 9:00 a.m.and 4:00 p.m. to 6:00 p.m. on designated major arterials or as directed by the Engineer. D Contractor shall maintain local driveway access to residential and commercial properties adjacent to work areas at all times. E Cleanliness of Surrounding Streets: 1. Keep streets used for entering or leaving the job area free of excavated material, debris, and any foreign material resulting from construction operations. Leave the area broom-clean or its equivalent at the end of the work day. F Control vehicular parking to prevent interference with public traffic and parking,and access by emergency vehicles. G Monitor parking of construction personnel's vehicles in existing facilities. Maintain vehicular access to and through parking areas. H Prevent parking on or adjacent to access roads or in non-designated areas. 3.02 FLARES AND LIGHTS A Provide flares and lights during hours of low visibility to delineate traffic lanes and to guide traffic. 3.03 HAUL ROUTES A Utilize haul routes designated by Owner or shown on the Plans for construction traffic. B Confine construction traffic to designated haul routes. C Provide traffic control at critical areas of haul routes to regulate traffic and minimize interference with public traffic. D Contractor shall be responsible for any damage caused by vehicles utilizing haul routes. 3.04 TRAFFIC SIGNS AND SIGNALS A Install traffic control devices at approaches to the site and on site, at crossroads, detours, parking areas, and elsewhere as needed to direct construction and affected public traffic. B Relocate traffic signs and control devices as Work progresses to maintain effective traffic control. 3.05 BRIDGING TRENCHES AND EXCAVATIONS A Whenever necessary,bridge trenches and excavation to permit an unobstructed flow of traffic. 03/2008 01555-3 of 4 CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION B Secure bridging against displacement by using adjustable cleats,angles,bolts or other devices whenever bridge is installed: 1. On an existing bus route; 2. When more than five percent of daily traffic is comprised of commercial or truck traffic; 3. When more than two separate plates are used for the bridge; or 4. When bridge is to be used for more than five consecutive days. C Install bridging to operate with minimum noise. D Adequately shore the trench or excavation to support bridge and traffic. E Extend steel plates used for bridging a minimum of one foot beyond edges of trench or excavation. Use temporary paving materials (premix) to feather edges of plates to minimize wheel impact on secured bridging. F Use steel plates of sufficient thickness to support H-20 loading, truck or lane, that produces maximum stress. 3.06 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. B Remove equipment and devices when no longer required. C Repair damage caused by installation. D Remove post settings to a depth of 2 feet. END OF SECTION 03/2008 01555-4 of 4 CITY OF PEARLAND FILTER FABRIC FENCE Section 01560 FILTER FABRIC FENCE 1.0 GENERAL 1.01 SECTION INCLUDES A Installation of filter fabric fence to control erosion and contain sediments and pollutants from overland flow. Filter fabric fence is not for use in channelized flow areas.Filter fabric fence may be reinforced. B References to Technical Specifications: 1. Section 01200—Measurement&Payment Procedures 2. Section 01350—Submittals 3. Section 01562—Waste Material Disposal 4. Section 01566—Source Controls for Erosion&Sedimentation C Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM D 3786,"Standard Test Method for Hydraulic Bursting strength of Textile Fabrics" b. ASTM D 4632, "Standard Test Method for Grab Breaking Load and Elongation of Geotextiles" 1.02 MEASURMENT AND PAYMENT A Filter fabric fence will be measured by the linear foot between the limits of the beginning and ending of wooden stakes. B Payment for filter fabric fence will include and be full compensation for all labor, equipment,materials,supervision,and all incidental expenses for construction of these items,complete in place,including,but not limited to protection of trees,maintenance requirements, repair and replacement of damaged sections, removal of sediment deposits, and removal of erosion and sediment control systems at the end of construction. C Refer to Section 01200—Measurement&Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Manufacturer's catalog sheets and other Product Data on geotextile fabric. (11111 03/2008 01560- 1 of 3 CITY OF PEARLAND FILTER FABRIC FENCE 2.0 PRODUCTS 2.01 FILTER FABRIC A Provide woven or nonwoven geotextile filter fabric made of either polypropylene, polyethylene, ethylene, or polyamide material. B By ASTM D 4632, geotextile fabric shall have a grab strength of 100 psi in any principal direction,a Mullen burst strength exceeding 200psi by ASTM-D3786,and the equivalent opening size between 50 and 140. C Filter fabric shall contain ultraviolet inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 degrees F to 120 degrees F. D Representative Manufacturer: Mirafi, Inc., or equal. 3.0 EXECUTION 3.01 PREPARATION AND INSTALLATION A Provide erosion and sediment control systems at the locations shown on Plans. Such systems shall be of the type indicated and shall be constructed in accordance with the requirements shown on the Plans and specified in this Section. B Erosion and sediment control measures shall be in place prior to the start of any Work that exposes the soil, other than as specifically directed by the Engineer to allow soil testing and surveying. C Regularly inspect and repair or replace damaged components of filter fabric fence as specified in this Section, 3.02F. Unless otherwise directed,maintain the erosion and sediment control systems until the Work is accepted by the Owner. Remove erosion and sediment control systems promptly when directed by the Engineer. Discard removed materials in accordance with Section 01562—Waste Material Disposal. D Conduct all construction operations under this Contract in conformance with the erosion control practices described in Section 01566—Source Controls for Erosion& Sedimentation. 3.02 CONSTRUCTION METHODS A Provide filter fabric fence systems in accordance with the Plan detail for Filter fabric fence. Filter fabric fence shall be installed in such a manner that surface runoff will percolate through the system in sheet flow fashion and allow sediment to be retained and accumulated. B Attach the filter fabric to 2-inch by 2-inch wooden stakes spaced a maximum of 3 feet apart and embedded a minimum of 8 inches. If filter fabric is factory preassembled 7 03/2008 01560-2 of 3 CITY OF PEARLAND FILTER FABRIC FENCE with support netting,then maximum spacing allowable is 8 feet. Install wooden stakes at a slight angle toward the source of anticipated runoff. C Trench in the toe of the filter fabric fence with a spade or mechanical trencher as shown on the Plans. Lay filter fabric along the edges of the trench. Backfill and compact trench. D Filter fabric fence shall have a minimum height of 18 inches and a maximum height of 36 inches above natural ground. E Provide the filter fabric in continuous rolls and cut to the length of the fence to minimize the use of joints. When joints are necessary,splice the Fabric together only at a support post with a minimum 6-inch overlap and seal securely. F Inspect filter fabric fence systems after each rainfall,daily during periods of prolonged rainfall, and at a minimum once each week. Repair or replace damaged sections immediately. Remove sediment deposits when silt reaches a depth one-third the height of the fence or 6 inches, whichever is less. END OF SECTION (1/1116\. (11111's 03/2008 01560-3 of 3 CITY OF PEARLAND REINFORCED FILTER FABRIC BARRIER Section 01561 REINFORCED FILTER FABRIC BARRIER 1.0 GENERAL 1.01 SECTION INCLUDES A Installation of reinforced filter fabric barrier to control erosion and contain sediments and pollutants in channelized flow areas. B References to Technical Specifications: 1. Section 01200—Measurement&Payment Procedures 2. Section 01350—Submittals 3. Section 01566—Source Controls for Erosion &Sedimentation C Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM D 3786,"Standard Test Method for Hydraulic Bursting strength of Textile Fabrics" b. ASTM D 4632, Standard Test Method for Grab Breaking Load and Elongation of Geotextiles" 1.02 MEASURMENT AND PAYMENT A Measurement for reinforced filter fabric barrier is on a linear foot basis between the limits of the beginning and ending fence posts, measured, accepted, and complete in place. B Payment for filter fabric barrier will include and be full compensation for all labor, equipment, materials, supervision, and incidental expenses for construction of these items,complete in place,including,but not limited to protection of trees,maintenance requirements, repair and replacement of damaged sections, removal of sediment deposits, and removal of erosion and sediment control systems at the end of construction.. C Refer to Section 01200—Measurement&Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Manufacturer's catalog sheets and other product data on geotextile fabric. 05/2008 01561 - 1 of 3 CITY OF PEARLAND REINFORCED FILTER FABRIC BARRIER 2.0 PRODUCTS 2.01 FILTER FABRIC A Provide woven or nonwoven geotextile filter fabric made of either polypropylene, polyethylene, ethylene, or polyamide material. B By ASTM - D4632, geotextile fabric shall have a grab strength of 100 psi in any principal direction,a Mullen burst strength exceeding 200psi by ASTM-D3786,and the equivalent opening size between 50 and 140. C Filter fabric shall contain ultraviolet inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 degrees F to 120 degrees F. D Representative Manufacturer: Mirafi, Inc., or equal. 2.02 FILTER FABRIC.REINFORCEMENT A Provide woven galvanized steel wire fence with minimum thickness of 14 gauge and a maximum mesh spacing of 6 inches. B Welded wire shall be galvanized, 2-inch by 4-inch, welded wire fabric, 121 gauge. 2.03 EXECUTION 2.04 PREPARATION A Provide erosion and sediment control systems at the locations shown on Plans. Such systems shall be of the type indicated and shall be constructed in accordance with the requirements shown on the Plans and specified in this Section. B Erosion and sediment control measures shall be in place prior to the start of any Work that exposes the soil, other than as specifically directed by the Engineer to allow soil testing and surveying. C Regularly inspect and repair or replace damaged components of filter fabric barrier. Unless otherwise directed,maintain the erosion and sediment control systems until the Work is accepted by the Owner. Remove erosion and sediment control systems promptly when directed by the Engineer. Discard removed materials in accordance with Section 1562—Waste Material Disposal. D Conduct all construction operations under this Contract in conformance with the erosion control practices described in Section 01566—Source Controls for Erosion& Sedimentation. 05/2008 01561 -2 of 3 CITY OF PEARLAND REINFORCED FILTER FABRIC BARRIER 2.05 INSTALLATION A Install reinforced filter fabric barriers for erosion and sediment control used during construction and until the final development of the Project Site. Reinforced filter fabric barriers are used to retain sedimentation in channelized flow areas. B Provide reinforced filter fabric barrier in accordance with the Plan detail for Reinforced Filter Fabric Barrier. Reinforced filter fabric barrier systems shall be installed in such a manner that runoff will percolate through the system and allow sediment to be retained and accumulated. C Trench in the toe of the reinforced filter fabric barrier with a spade or mechanical trencher as shown on the Plans. Lay filter fabric along the edges of the trench. Backfill and compact trench. D Reinforced filter fabric barrier shall have a height of 18 inches. E Securely fasten the filter fabric to the wire with tie wires. F Provide the filter fabric in continuous rolls and cut to the length of the fence to minimize the use of joints. When joints are necessary, splice the fabric together only at a support post with a minimum 6-inch overlap and seal securely. G Inspect the reinforced filter fabric barrier systems after each rainfall, daily during periods of prolonged rainfall, and at a minimum once each week. Repair or replace damaged sections immediately. Remove sediment deposits when silt reaches a depth one-third the height of the barrier or 6 inches, whichever is less. END OF SECTION 05/2008 01561 -3 of 3 CITY OF PEARLAND WASTE MATERIAL DISPOSAL Section 01562 WASTE MATERIAL DISPOSAL 1.0 GENERAL 1.01 SECTION INCLUDES A Disposal of waste material and salvageable material. B References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01566—Source Controls for Erosion&Sedimentation 3. Section 01600—Materials &Equipment 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350— Submittals. B Obtain and submit applicable permits for proposed disposal sites. C Submit a Waste Material Disposal Plan. D Submit a copy of written permission from property owners,along with a description of the property,prior to disposal of excess material adjacent to the Project Site. Submit a written and signed release from property owner upon completion of disposal work. City of Pearland requires individual fill placement permits for all fill placed within the City limits. 1.04 WASTE MATERIAL DISPOSAL PLAN A Contractor shall formulate and implement a plan for the collection and disposal of waste materials on the Project Site which includes the following information: 1. Schedule for collection and inspection. 2. Location of trash and waste receptacles. 3. Provisions for liquid waste and potential water pollutants material. B The plan shall comply with applicable federal, state, and local health and safety regulations and Section 01566—Source Controls for Erosion&Sedimentation. 2.0 PRODUCTS - Not Used 07/2006 01562- 1 of 3 CITY OF PEARLAND WASTE MATERIAL DISPOSAL 3.0 EXECUTION 3.01 SALVAGEABLE MATERIAL A Excavated material: When indicated on Plans, load, haul, and deposit excavated material at a location or locations outside the limits of Project Site. B Base, surface, and bedding material: Deliver gravel, asphaltic, or other base and surfacing material designated for salvage to the location designated by the Engineer. C Pipe culvert: Deliver culverts designated for salvage to Owner's storage area. D Other salvageable materials: Conform to requirements of individual Technical Specifications. E Coordinate delivery of salvageable material with Engineer. F When temporary, on-site storage of salvaged materials is required, comply with applicable provisions of Section 01600—Materials &Equipment. 3.02 SEDIMENT DISPOSAL A Remove sediment deposits and dispose of them at the designated spoil site for the Project. If a spoil site is not designated on the Plans, dispose of sediment off site at a location not in or adjacent to a stream or floodplain. B Off-site disposal is the responsibility of the Contractor. C Sediment to be placed at the Project Site should be spread evenly throughout the designated area,compacted and stabilized. Sediment shall not be allowed to flush into a stream or drainage way. D If sediment has been contaminated,it shall be disposed of in accordance with existing federal, state, and local rules and regulations. 3.03 EXCESS MATERIAL,WASTE,AND EQUIPMENT A Vegetation,rubble,broken concrete,debris,asphaltic concrete pavement,excess soil, and other materials not designated for salvage,shall become the property of Contractor and shall be removed from the Project Site and legally disposed of. B Dispose of removed equipment,materials,waste and debris in a manner conforming to applicable laws and regulations C Excess soil may be deposited on private property adjacent to the Project Site when written permission is obtained from property owner under the provisions of this Section, 1.03D. n 07/2006 01562-2 of 3 CITY OF PEARLAND WASTE MATERIAL DISPOSAL D Verify the flood plain status of any proposed disposal site. Do not dispose of excavated materials in an area designated as within the 100-year Flood Hazard Area. E Waste materials shall be removed from the site on a daily basis, such that the site is maintained in a neat and orderly condition. F No materials shall be disposed in a manner to damage the Owner in any way. END OF SECTION (1111116'\1 07/2006 01562-3 of 3 CITY OF PEARLAND TREE AND PLANT PROTECTION Section 01563 TREE AND PLANT PROTECTION 1.0 GENERAL 1.01 SECTION INCLUDES A Tree and plant protection. B References to Technical Specifications: None 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 PROJECT CONDITIONS A Preserve and protect existing trees and plants to remain from foliage,branch,trunk,or root damage that could result from construction operations. B Prevent following types of damage: 1. Compaction of root zone by foot or vehicular traffic, or material storage. 2. Trunk damage from equipment operations, material storage, or from nailing or bolting. 3. Trunk and branch damage caused by ropes or guy wires or machine impacts. 4. Root poisoning from spilled solvents, gasoline, paint, and other noxious materials. 5. Branch damage due to improper pruning or trimming. 6. Damage from lack of water due to: Cutting or altering natural water migration patterns near root zones. Failure to provide adequate watering. 7. Damage from alteration of soil pH factor caused by depositing lime, concrete,plaster, or other base materials near roots. 8. Cutting feeder of roots or roots larger than 1-1/2 inches in diameter. C. Confine Work activities to the identified Work Zone, Right of Way or Easement as described in SECTION 01140, CONTRACTOR'S USE OF PREMISES, Limits of Construction 1.04 DAMAGE ASSESSMENT A When trees,other than those designated for removal,are destroyed or badly damaged as a result of construction operations,remove and replace with same size,species,and variety up to and including 8 inches in trunk diameter. Trees larger than 8 inches in diameter shall be replaced with an 8-inch diameter tree of the same species and variety and total contract amount will be reduced by an amount determined from the following 01/2008 01563- 1 of 4 CITY OF PEARLAND TREE AND PLANT PROTECTION International Shade Tree Conference formula: 0.7854 x D2 x $10.00 where D is diameter in inches of tree or shrub trunk measured 12 inches above grade. B All necessary tree replacements shall be as approved by Engineer/Urban Forester. 2.0 PRODUCTS 2.01 MATERIALS A Asphalt paint: Emulsified asphalt or other adhesive, elastic, antiseptic coating formulated for horticultural use on cut or injured plant tissue,free from kerosene and coal creosote. B Burlap: Suitable for use as tree wrapping. C Fertilizer: Liquid containing 20 percent nitrogen, 10 percent phosphorus, and 5 percent potash. 3.0 EXECUTION 3.01 PROTECTION AND MAINTENANCE OF EXISTING TREES AND SHRUBS A Except for trees and shrubs shown on Plans to be removed,all trees and shrubs within the Project Site area are to remain and be protected from damage. B For designated trees to be removed,perform the following: 1. Stake right-of-way limits and identify any tree of diameter greater than 4 inches which is to be removed. Mark trees prior to felling with an X in orange paint, clearly visible, on the trunk, and at eye level. 2. After marking trees give a minimum of 48-hours notice in writing to the Engineer of intent to begin felling operations. 3. Trees whose trunks are only partially in the right-of-way shall be protected and preserved as described below. C For trees or shrubs to remain,perform the following: 1. Trim trees and shrubs only as necessary. Trees and shrubs requiring pruning for construction should also be pruned for balance as well as to maintain proper form and branching habit. Cut limbs at branch collar. No stubs should remain on trees. Branch cuts should not gouge outer layer of tree structure or trunk. 2. Use extreme care to prevent excessive damage to root systems. Roots in construction areas will be cut smoothly with a trencher before excavation begins. Do not allow ripping of roots with a backhoe or other equipment. Temporarily cover exposed roots with wet burlap to prevent roots from drying out. Cover exposed roots with soil as soon as possible. 3. Prevent damage or compaction of root zone(area inside dripline)by construction activities. 01/2008 01563-2 of 4 CITY OF PEARLAND TREE AND PLANT PROTECTION Do not allow scarring of trunks or limbs by equipment or other means. Do not store construction materials, vehicles, or excavated material inside dripline of trees. Do not pour liquid materials inside dripline. 4. Water and fertilize trees and shrubs that will remain to maintain their health during construction period. Supplemental watering of landscaping during construction should be done once a week in months receiving average rainfall and twice a week in months receiving below average rainfall. This watering shall consist of saturating soils at least 6 to 8 inches beneath surface. 5. Water areas currently being served by private sprinkler systems while systems are temporarily taken out of service to maintain health of existing landscapes. 6. At option of the Contractor and with the Engineer's permission,trees and shrubs to remain may be temporarily transplanted and returned to original positions under supervision of professional horticulturist. 3.02 PROTECTIVE CONTROLS A Protection of trees or shrubs in open area: 1. Install steel drive-in fence posts in protective circle, approximately 8 feet on center, not closer than 4 feet to trunk of trees or stems of shrubs. 2. Drive steel drive-in fence posts 3 feet minimum into ground, leaving 5 feet minimum above ground. 3. For trees or shrubs in paved areas, use moveable posts constructed from concrete-filled steel pipe 2-1/2 inches minimum in diameter mounted in rubber auto tires filled with concrete. 4. Mount steel hog-wire on posts. B Timber-wrap protection for trees in close proximity of moving or mechanical equipment and construction work: 1. Wrap trunk with layer of burlap. 2. Install 2 x 4's or 2 x 6's (5-foot to 6-foot lengths) vertically, spaced 3 inches to 5 inches apart around circumference of tree trunk. 3. Tie in place with 12 to 9 gage steel wire. 3.03 MAINTENANCE OF NEWLY PLANTED TREES A Water newly planted trees adequately to maintain and support healthy plants. B The Contractor guarantees that trees planted for this Work shall remain alive and healthy at least until the end of a one-year warranty period. 1. Within four weeks of notice from Owner, Contractor shall replace, at his expense, any dead trees or any trees that in the opinion of Owner, have become unhealthy or unsightly or have lost their natural shape as a result of additional growth,improper pruning or maintenance, or weather conditions. 01/2008 01563-3 of 4 CITY OF PEARLAND TREE AND PLANT PROTECTION C1111.* 2. When tree must be replaced, the guarantee period for that tree shall begin on date of replacement of tree, subject to the Owner's inspection, for no less than one year. 3. Straighten leaning trees and bear entire cost. 4. Dispose of trees rejected at any time by Engineer at Contractor's expense. END OF SECTION 01/2008 01563-4 of 4 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER Section 01564 CONTROL OF GROUND WATER AND SURFACE WATER 1.0 GENERAL 1.01 SECTION INCLUDES A Dewatering,depressurizing,draining,and maintaining trench and structure excavations and foundation beds in dry and stable condition. B Protecting work against surface runoff and rising flood waters. C Disposing of removed water. D References to Technical Specifications: 1. Section 01200—Measurement&Payment Procedures 2. Section 01350—Submittals 3. Section 01570—Trench Safety Systems 4. Section 01565—TPDES Requirements 5. Section 01566—Source Controls for Erosion&Sedimentation E Referenced Standards: 1. Occupational Safety and Health Administration (OSHA) 2. Texas Commission on Environmental Quality(TCEQ) 3. Code of Ordinances, City of Pearland, Texas 4. Water Well Drillers and Pump Installers Advisory Council (WWD/PI) F Definitions: 1. Ground Water Control Systems -installations external to the excavation such as well points, eductors, or deep wells. Ground water control includes dewatering and depressurization. a. Dewatering-lowering the water table and intercepting seepage which would otherwise emerge from slopes or bottoms of excavations and disposing of removed water. The intent of dewatering is to increase stability of excavated slopes; prevent dislocation of material from slopes or bottoms of excavations;reduce lateral loads on sheeting and bracing;improve excavating and hauling characteristics of excavated material;prevent failure or heaving of the bottom of excavations; and to provide suitable conditions for placement of backfill materials and construction of structures and other installations. b. Depressurization-reduction in piezometric pressure within strata not controlled by dewatering alone, as required to prevent failure or heaving of excavation bottom. 2. Surface Water Control-diversion and drainage of surface water runoff and rain water away from the excavation. 3. Excavation Drainage-keeping excavations free of surface and seepage water. 02/2008 01564- 1 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER 1.02 MEASUREMENT AND PAYMENT A Measurement for and control of ground water for open cut pipe excavations shall be on a linear foot basis and shall not exceed the length of open cut pipe installation in the area requiring ground water control. B Unless indicated as a Bid Item,no separate payment will be made for control of ground water for any condition(s) other than those described in this Section, 1.02A. No separate payment will be made for control of surface water. Include the cost to control non-pipe excavation ground water and surface water in price for Work requiring such controls. C Refer to Section 01200—Measurement&Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit a Ground Water and Surface Water Control Plan for review by the Engineer prior to start of any field work. The plan shall be signed by a Professional Engineer registered in the State of Texas. The plan shall include the following: 1. Results of subsurface investigation and description of the extent and characteristics of water bearing layers subject to ground water control. 2. Names of equipment suppliers and installation subcontractors. 3. A description of proposed ground water control systems indicating arrangement, location, depth and capacities of system components, installation details and criteria, and operation and maintenance procedures. 4. A description of proposed monitoring and control system indicating depths and locations of piezometers and monitoring wells,monitoring installation details and criteria, type of equipment and instrumentation with pertinent data and characteristics. 5. A description of proposed filters including types, sizes, capacities and manufacturer's application recommendations. 6. Design calculations demonstrating adequacy of proposed systems for intended applications. Define potential area of influence of ground water control operation near contaminated areas. 7. Operating requirements,including piezometric control elevations for dewatering and depressurization. 8. Excavation drainage methods including typical drainage layers, sump pump application and other necessary means. 9. Surface water control and drainage installations. 10. Proposed methods and locations for disposing of removed water. C Submit the following records upon completed initial installation: 1. Installation and development reports for well points, eductors, and deep wells. 02/2008 01564-2 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER 2. Installation reports and baseline readings for piezometers and monitoring wells. 3. Baseline analytical test data of water from monitoring wells. 4. Initial flow rates. D Submit the following records on a weekly basis during operations: 1. Records of flow rates and piezometric elevations obtained during monitoring of dewatering and depressurization. Refer to this Section, 3.02 "Requirements for Eductor,Well Points, or Deep Wells". 2. Maintenance records for ground water control installations, piezometers, and monitoring wells. E Submit the following records at end of the Work. Decommissioning(abandonment) reports for monitoring wells and piezometers installed by other during the design phase and left for Contractor's monitoring and use. 1.04 PERFORMANCE REQUIREMENTS A Conduct subsurface investigations to identify groundwater conditions and to provide parameters for design, installation, and operation of groundwater control systems. B Design a ground water control system, compatible with the requirements of OSHA Standards - 29 CFR,Part 1926, and Section 01570-Trench Safety Systems of these Technical Specifications,to produce the following results: 1. Effectively reduce the hydrostatic pressure affecting excavations. 2. Develop a substantially dry and stable subgrade for subsequent construction operations. 3. Preclude damage to adjacent properties,buildings, structures, utilities, installed facilities, and other work. 4. Prevent the loss of fines, seepage, boils, quick condition, or softening of the foundation strata. 5. Maintain stability of sides and bottom of excavations. C Ground water control systems may include single-stage or multiple-stage well point systems, eductor and ejector-type systems, deep wells, or combinations of these equipment types. D Provide drainage of seepage water and surface water, as well as water from any other source entering the excavation. Excavation drainage may include placement of drainage materials, such as crushed stone and filter fabric, together with sump pumping. E Provide ditches,berms,pumps and other methods necessary to divert and drain surface water from excavation and other work areas. F Locate ground water control and drainage systems so as not to interfere with utilities, construction operations, adjacent properties, or adjacent water wells. 02/2008 01564-3 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER G Assume sole responsibility for ground water control systems and for any loss or damage resulting from partial or complete failure of protective measures and any settlement or resultant damage caused by the ground water control operations. Modify ground water control systems or operations if they cause or threaten to cause damage to new construction, existing site improvements, adjacent property, or adjacent water wells,or affect potentially contaminated areas. Repair damage caused by ground water control systems or resulting from failure of the system to protect property as required. H Provide an adequate number of piezometers installed at the proper locations and depths as required to provide meaningful observations of the conditions affecting the excavation, adjacent structures, and water wells. I Provide environmental monitoring wells installed at the proper locations and depths as required to provide adequate observations of hydrostatic conditions and possible contaminant transport from contamination sources into the work area or into the ground water control system. J Decommission piezometers and monitoring wells installed during design phase studies and left for Contractors monitoring and use. 1.05 ENVIRONMENTAL REQUIREMENTS A Comply with requirements of agencies having jurisdiction. B Comply with TCEQ regulations and WWD/PI Advisory Council for development, drilling, and abandonment of wells used in dewatering system. C Obtain permit from TCEQ under the Texas Pollutant Discharge Elimination System (TPDES),for storm water discharge from construction sites. Refer to Section 01565— TPDES, 3.02"Certification Requirements". D Obtain all necessary permits from agencies with control over the use of groundwater and matters affecting well installation, water discharge, and use of existing storm drains and natural water sources. Because the review and permitting process may be lengthy, take early action to pursue and submit for the required approvals. E Monitor ground water discharge for contamination while performing pumping in the vicinity of potentially contaminated sites. F Implement control of ground and surface water under the provisions of Section 01566 —Source Controls for Erosion&Sedimentation. 2.0 PRODUCTS 2.01 EQUIPMENT AND MATERIALS A Equipment and materials are at the option of Contractor as necessary to achieve desired results for dewatering. Selected equipment and materials are subject to review 02/2008 01564-4 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER of the Engineer through Submittals required in Section 01350 — Submittals, 1.06 "Operations and Maintenance Data". B Eductors, well points, or deep wells, where used, must be furnished, installed and operated by an experienced contractor regularly engaged in ground water control system design, installation, and operation. C Equipment and instrumentation for monitoring and control of the ground water control system includes piezometers and monitoring wells,and devices, such as flow meters, for observing and recording flow rates. D All equipment must be in good repair and operating order. E Sufficient standby equipment and materials shall be kept available to ensure continuous operation, where required. 3.0 EXECUTION 3.01 GROUND WATER CONTROL A Perform a subsurface investigation by borings as necessary to identify water bearing layers,piezometric pressures,and soil parameters for design and installation of ground water control systems. Perform pump tests, if necessary to determine the drawdown characteristics of the water-bearing layers. The results shall be presented in the Ground Water and Surface Water Control Plan. Refer to this Section, 1.03B. B Provide labor, material, equipment, techniques and methods to lower, control and handle ground water in a manner compatible with construction methods and site conditions. Monitor effectiveness of the installed system and its effect on adjacent property. C Install, operate, and maintain ground water control systems in accordance with the Plan. Notify Engineer in writing of any changes made to accommodate field conditions and changes to the Work. Provide revised drawings and calculations with such notification. D Provide for continuous system operation, including nights, weekends, and holidays. Arrange for appropriate backup if electrical power is primary energy source for dewatering system. E Monitor operations to verify that the system lowers ground water piezometric levels at a rate required to maintain a dry excavation resulting in a stable subgrade for prosecution of subsequent operations. F Where hydrostatic pressures in confined water bearing layers exist below excavation, depressurize those zones to eliminate risk of uplift or other instability of excavation or installed works. Allowable piezometric elevations shall be defined in the Plan. 02/2008 01564-5 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER (11.*\. G Maintain water level below sub grade elevation. Do no t of allow levels to rise until foundation concrete has achieved design strength. H During backfilling,dewatering may be reduced to maintain water level a minimum of 5 feet below prevailing level of backfill. However, do not allow that water level to • result in uplift pressures in excess of 80 percent of downward pressure produced by weight of structure or backfill in place. Do not allow water levels to rise into cement stabilized sand until at least 48 hour after placement. I Provide a uniform diameter for each pipe drain run constructed for dewatering. Remove pipe drain when it has served its purpose. If removal of pipe is impractical, provide grout connections at 50-foot intervals and fill pipe with cement-bentonite grout or cement-sand grout when pipe is removed from service. J Extent of construction ground water control for structures with a permanent perforated underground drainage system may be reduced,such as for units designed to withstand hydrostatic uplift pressure. Provide a means of draining the affected portion of underground system,including standby equipment. Maintain drainage system during operations and remove it when no longer required. K Remove system upon completion of construction or when dewatering and control of surface or ground water is no longer required. (1111b\' L Compact backfill as required by the Contract Documents. 3.02 REQUIREMENTS FOR EDUCTOR,WELL POINTS, OR DEEP WELLS A For aboveground piping in ground water control system,include a 12-inch minimum length of clear, transparent piping between every eductor well or well point and discharge header so that discharge from each installation can be visually monitored. B Install sufficient piezometers or monitoring wells to show that all trench or shaft excavations in water bearing materials are predrained prior to excavation. Provide separate piezometers for monitoring of dewatering and for monitoring of depressurization. Install piezometers and monitoring wells for tunneling as appropriate for Contractor's selected method of work. C Install piezometers or monitoring wells not less than one week in advance of beginning the associated excavation. D Dew atering may be omitted for portions of underdrains or other excavations,but only where auger borings and piezometers or monitoring wells show that soil is predrained by an existing system such that the criteria of the Ground Water and Surface Water Control Plan are satisfied. ClW 02/2008 01564-6 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER E Replace installations that produce noticeable amounts of sediments after development. F Provide additional ground water control installations or change the methods in the event that the installations according to the Ground Water and Surface Water Control Plan do not provide satisfactory results based on the performance criteria defined by the Plan and by this Section. Submit a revised Plan according to this Section, 1.03A. G Mechanical dewatering equipment shall comply with Chapter 19 NOISE, Code of Ordinances, City of Pearland, Texas. 3.03 EXCAVATION DRAINAGE A Contractor may use excavation drainage methods if necessary to achieve well drained, stable trench conditions. The excavation drainage may consist of the following methods or combination of methods: 1. Sump pumping in combination with: a. Layer of crushed stone and filter fabric. b. Sand and gravel drains. 2. Wells for ground water control. B Use sump pumping and a drainage layer, as defined in ASTM D 2321,placed on the foundation beneath pipe bedding or thickened bedding layer of Class I material. 3.04 MAINTENANCE AND OBSERVATION A Conduct daily maintenance and observation of piezometers or monitoring wells while the ground water control installations or excavation drainage are operating in an area. Keep system in good operating condition. B Replace damaged and destroyed piezometers or monitoring wells with new piezometers or wells as necessary to meet observation schedule. C Cut off piezometers or monitoring wells in excavation areas where piping is exposed, only as necessary to perform observation as excavation proceeds. Continue to maintain and make observations, as specified. D Remove and grout piezometers inside or outside the excavation area when ground water control operations are complete. Remove and grout monitoring wells when directed by the Engineer. 3.05 MONITORING AND RECORDING A Monitor and record average flow rate of operation for each deep well, or for each wellpoint or eductor header used in dewatering system. Also monitor and record water level and ground water recovery. These records shall be obtained daily until steady conditions are achieved, and twice weekly thereafter. 02/2008 01564-7 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER B Observe and record elevation of water level daily as longground water control as system is in operation, and weekly thereafter until the Work is completed or piezometers or wells are removed, except when Engineer determines that more frequent monitoring and recording are required. Comply with Engineer's direction for increased monitoring and recording and take measures as necessary to ensure effective dewatering for intended purpose. 3.06 SURFACE WATER CONTROL A Intercept surface water and divert it away from excavations through use of dikes, ditches,curb walls,pipes,sumps or other approved means. The requirement includes temporary works required to protect adjoining properties from surface drainage caused by construction operations. B Divert surface water and seepage water into sumps and pump it into drainage channels or storm drains, when approved by agencies having jurisdiction. Provide settling basins when required by such agencies. C Provide additional surface water control measures or change the methods in the event that the measures according to the Ground Water and Surface Water Control Plan do not provide satisfactory results based on the performance criteria defined by the Plan and by this Section. Submit a revised Plan according to this Section, 1.03B. rub\ END OF SECTION (1116.\ 02/2008 01564-8 of 8 CITY OF PEARLAND TPDES REQUIREMENTS Section 01565 TPDES REQUIREMENTS 1.0 GENERAL 1.01 SECTION INCLUDES A Description of the required documentation to be prepared and signed by the Contractor before conducting construction operations,in accordance with the terms and conditions of the Texas Pollutant Discharge Elimination System (TPDES) General Permit as issued March 5,2003 by the Texas Commission on Environmental Quality under the provisions of Section 402 of the Clean Water Act and Section 26.040 of the Texas Water Code. B Contractor's responsibility for implementation,maintenance,and inspection of storm water pollution prevention control measures including,but not limited to,erosion and sediment controls,storm water management plans,waste collection and disposal,off- site vehicle tracking,and other practices shown on the Plans or specified elsewhere in this or other Technical Specifications. C References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01310—Coordination &Meetings 3. Section 01770—Contract Closeout D Referenced Standards: 1. Texas Commission on Environmental Quality(TCEQ) E Other References: 1. Storm Water Pollution Prevention Plan (SWPPP) found in Appendix A of these Technical Specifications. 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 2.0 PRODUCTS - Not Used 01/2008 01565- 1 of 3 CITY OF PEARLAND TPDES REQUIREMENTS (11 3.0 EXECUTION 3.01 REQUIRED NOTICES A The Contractor shall complete, sign, and date the Contractor's Notice of Intent(NOI) attached in Appendix A. The signed copy of the Contractor's NOI shall be returned to the Owner. The Owner will complete the Owner's Notice of Intent attached in Appendix A and will submit both notices to the TCEQ. Submission of the NOI is required by both the Owner and the Contractor before construction operations start. B Upon completion of construction and acceptance of the Work by the Owner, the Contractor shall complete, sign, and date the Contractor's Notice of Termination (NOT) attached in Appendix A. 3.02 CERTIFICATION REQUIREMENTS A On the Operator's Information form attached in Appendix A, the Contractor shall complete name, address, and telephone number for the Contractor; the names of persons or firms responsible for maintenance and inspection of erosion and sediment control measures and all Subcontractors. B The Owner will complete and sign the Owner's Certification, shown in Appendix A and provide a copy to the Contractor for inclusion with other project certification forms. C The Contractor and Subcontractors named in the Contractor's Information form shall read, sign, and date the Contractor's/Subcontractor's Certification form, attached in Appendix A. D The persons or firms responsible for maintenance and inspection of erosion and sediment control measures shall read, sign, and date the Contractor's Inspection and Maintenance Certification form, attached in Appendix A. E The Contractor's Information form and all certification forms shall be submitted to the Owner before beginning construction. F Contractor shall review implementation of the SWPPP in a meeting with the Owner and Engineer prior to start of construction in accordance with Section 01310 — Coordination &Meetings. 3.03 RETENTION OF RECORDS A The Contractor shall keep a copy of the SWPPP at the Project Site or at the Contractor's office from the date that it became effective to the date the Work is accepted by the Owner. B At Contract Closeout,the Contractor shall submit to the Owner all TPDES forms and certifications, as well as a copy of the SWPPP, in accordance with Section 01770— 01/2008 01565-2 of 3 CITY OF PEARLAND TPDES REQUIREMENTS Contract Closeout. The SWPPP records and data will be retained by Owner for a period of 3 years from the date the Work is accepted by the Owner. 3.04 POSTING OF NOTICES A The following notices shall be posted from the date that this SWPPP goes into effect until the date the Work is accepted by the Owner: 1. Copies of the Notices of Intent submitted by the Owner and Contractor and a brief Description of Construction Activity being conducted at the Project Site, as given in Article 1 of the SWPPP, shall be posted at the Project Site or at Contractor's office in a prominent place for public viewing. 2. Notice to drivers of equipment and vehicles, instructing them to stop, check, and clean tires of debris and mud before driving onto traffic lanes. Post such notices at every stabilized construction exit area. 3. In an easily visible location on Project Site,post a notice of waste disposal procedures. 4. Notice of hazardous material handling and emergency procedures shall be posted with the NOI on Project Site. Keep copies of Material Safety Data Sheets at a location on Project Site that is known to all personnel. 5. Keep a copy of each signed certification at the Project Site or at Contractor's office. END OF SECTION 01/2008 01565-3 of 3 CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION Section 01566 SOURCE CONTROLS FOR EROSION AND SEDIMENTATION 1.0 GENERAL 1.01 SECTION INCLUDES A Descriptions of measures and practices,in response to TPDES General Permit TXR 150000, which shall be used on the Work to eliminate or significantly minimize pollutants in discharges into Surface Water in the State by controlling erosion and sediments at their source. B References to Technical Specifications: 1. Section 01550—Stabilized Construction Exit 2. Section 01562—Waste Material Disposal 3. Section 01500—Temporary Facilities and Controls C Definitions: 1. Potential Water Pollutant- any substance that could potentially alter the physical, thermal, chemical, or biological quality of the Surface Water in the State,rendering the water harmful, detrimental, or injurious to humans, ($1.16' animal life, vegetation, or property, or to public health, safety or welfare, or impairs the usefulness or the public enjoyment of the water for any lawful or reasonable purpose. 1.02 MEAUSREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 2.0 PRODUCTS - Not Used 3.0 EXECUTION 3.01 PREPARATION AND INSTALLATION A Contractor shall conduct all construction operations under this Contract in conformance with the erosion control practices described in the Plans and this Technical Specification. B Erosion and sediment control measures shall be in place prior to the start of any Work that exposes the soil, other than as specifically directed by the Engineer to allow soil testing and surveying. C The Contractor shall install, maintain, and inspect erosion and sediment control measures and practices that operate effectively and as specified in the Plans and in this or other Technical Specifications. 07/2006 01566- 1 of 5 CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION D Equipment and vehicles shall be prohibited by the Contractor from maneuvering on areas outside of the limits of construction or dedicated rights-of-way and easements. Damage caused by construction traffic to erosion and sediment control systems shall be repaired immediately by the Contractor. E The Contractor shall be responsible for collecting, storing,hauling, and disposing of spoil, silt, waste materials, and contaminated material resulting from erosion and sediment control measures as specified in this or other Technical Specifications and in compliance with applicable federal, state, and local rules and regulations. 3.02 EXPOSED SOIL A When soil is exposed as a result of clearing,grading,excavating,stockpiling,or other soil disturbing activities, the Contractor shall implement measures to effectively control erosion and prevent the escape of sediments from the Project Site. B Control measures may include the following practices: 1. Preserve existing vegetation to the extent possible. 2. Construct drainage swales,berms, or sediment basins. 3. Maintain grades to minimize the velocity of sheet flow over disturbed areas and promote evaporation and infiltration of storm water directly into the ground. 4. Install filter fabric fences or barriers, sediment traps, seepage basins, gabions, or storm drain inlet protection devices. 5. Utilize vegetative buffer strips, mulching, or riprap C When the placement of topsoil,bank sand,or other soil material is specified, after an area has been brought to grade and immediately prior to placement, loosen the subgrade discing or by scarifying to a depth of at least 2 inches to permit bonding to the subsoil. D When all soil disturbing activities have been completed, establish a perennial vegetative cover on all areas that are not paved, covered by permanent structures, or otherwise permanently stabilized. 3.03 DUST CONTROL A Implement control measures to minimize dust creation and movement on construction sites and roads and to prevent airborne sediment from reaching receiving streams or storm water conveyance systems, to reduce on-site and off-site damage, to prevent health hazards, and to improve traffic safety. B Control blowing dust by using one or more of the following measures: 1. Mulches bound with chemical binders. 2. Temporary vegetative cover. 3. Tillage to roughen surface and bring clods to the surface. 4. Irrigation by water sprinkling. 07/2006 01566-2 of 5 CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION 5. Barriers using solid board fences, burlap fences, crate walls,bales of hay, or similar materials. C Implement dust control measures immediately whenever dust can be observed blowing on the Project Site. 3.04 DEMOLITION AREAS A Demolition activities which create large amounts of dust with significant concentrations of heavy metals or other potential water pollutants shall use methods described in this Section,3.03"Dust Control",to limit transport of airborne pollutants. However, water or slurry used to control dust contaminated with heavy metals or potential water pollutants shall be retained on the Project Site and shall not be allowed to run directly into watercourses or storm water conveyance systems by the appropriate use of control measures described in this Section. Methods of ultimate disposal of these materials shall be carried out in accordance with applicable local, state, and federal health and safety regulations. 3.05 SEDIMENT TRACKING A Minimize off-site tracking of sediments and the generation of dust by construction vehicles, keeping the streets clean or construction debris and mud, by implementing (01 one or more of the following control measures: 1. Restrict all ingress and egress to stabilized construction exits. 2. Stabilize areas used for staging,parking, storage or disposal. 3. Stabilize on-site vehicle transportation routes. 4. Remove mud and other debris,washing if necessary, from vehicles prior to entrance onto public roadways from the Project Site. 5. Maintain grade to minimize the occurrence of mud on the Project Site. B Construct stabilized construction areas under the provisions of Section 01550 — Stabilized Construction Exists. C In addition to Stabilized Construction Exits shovel or sweep the pavement to the extent necessary to keep the street clean. Water-hosing or sweeping of debris and mud off of the street into adjacent areas is not allowed. 3.06 EQUIPMENT MAINTENANCE AND REPAIR A Control equipment maintenance and repair so that oils,gasoline,grease,solvents,and other potential water pollutants cannot be washed directly into receiving streams or storm water conveyance systems. B Control measures may include the following practices: 1. Confine maintenance and repair of construction machinery and equipment to areas specifically designated for that purpose. 2. Provide these areas with adequate waste disposal receptacles for liquid as well as solid waste. 07/2006 01566-3 of 5 CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION 3. Clean and inspect maintenance and repair areas daily. 4. Stabilize the area with coarse aggregate. 5. Maintain grade to prevent surface water from flowing over the area. 6. Place plastic matting, packed clay, tar paper, or other impervious material to prevent contamination of soil in the area. 7. Isolate areas of contaminated soil or other materials to facilitate proper removal and disposal. C Where effective control measures are not feasible,equipment shall be taken off-site for maintenance and repair. 3.07 WASTE COLLECTION AND DISPOSAL A Conduct operations in conformance with the plan provided in Section 01562—Waste Material Disposal and utilize such control measures,described in this Section,as may be necessary to eliminate or significantly reduce the discharge of possible water pollutants from the Project Site as a result of waste collection and disposal. B Keep receptacles and waste collection areas neat and orderly to the extent possible. Waste shall not be allowed to overflow its container or accumulate from day-to-day. Locate trash collection points where they will least likely be affected by concentrated storm water runoff. 3.08 WASHING AREAS A Vehicles such as concrete delivery trucks or dump trucks and other construction equipment shall not be washed at locations where the runoff will flow directly into a watercourse or storm water conveyance system. Preventative measures may include the following practices: 1. Designate special areas for washing vehicles. 2. Locate these areas where the wash water will spread out and evaporate or infiltrate directly into the ground, or where the runoff can be collected in a temporary holding or seepage basin. 3. Beneath wash areas construct a gravel or rock base to minimize mud production. B Construct washing areas under the provisions of Section 01550 — Stabilized Construction Exists. 3.09 STORAGE AND USAGE OF POTENTIAL WATER POLLUTANTS A Store and use potential water pollutants such as pesticides,fertilizers,distillate fuels, lubricants, solvents, cements, paints, acids, caustics, and other toxic substances in accordance with manufacturers' guidelines, Material Safety Data Sheets, and with local, state, and federal regulations. n 07/2006 01566-4 of 5 CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION B Isolate these substances in areas where theyare to be stored,opened or used such that P they will not cause pollution of runoff from the Project Site. Preventative measures may include the following practices: 1. Stabilize the area with coarse aggregate. 2. Store containers on raised platforms. 3. Place plastic matting,packed clay, tar paper, or other impervious material to prevent contamination of soil in the area. 4. Provide protective cover or weather proof enclosure. 5. Minimize accidental spillage. 6. Keep containers tightly closed. 7. Periodically inspect containers for leakage. 8. Maintain grade to prevent surface water from flowing over the area. 9. Provide berms,filter fabric fences or barriers, or sediment basins. 10. Designate washing areas for containers and other items that have come in contact with potential water pollutants. C Avoid overuse of substances such as pesticides and fertilizers which could produce contaminated runoff. 3.10 SANITARY FACILITIES A Provide the Project Site with adequate portable toilets for workers in accordance with (111116\ Section 01500-Temporary Facilities and Controls,and applicable health regulations. B Control areas where sanitary facilities are located so that sewage or chemicals will not be washed directly into receiving streams or storm water conveyance systems by using one or more of the following measures. 1. Inspect the facilities daily. 2. Service the facilities as often as necessary to maintain cleanliness and prevent overflows. 3. Stabilize the area with coarse aggregate 4. Maintain grade to prevent surface water from flowing over the area END OF SECTION Club.\ 07/2006 01566-5 of 5 CITY OF PEARLAND TRENCH SAFETY SYSTEM Section 01570 TRENCH SAFETY SYSTEM 1.0 GENERAL 1.01 SECTION INCLUDES A Trench safety system for the construction of trench excavations. B Trench safety system for excavation of utilities, excavation of structures, and embankment which fall under provisions of federal, state, or local excavation safety laws. C References to Technical Specifications: 1. Section 01200—Measurement&Payment Procedures 2. Section 01350—Submittals D Referenced Standards: 1. Occupational Safety and Health Administration (OSHA) E Definitions: 1. Trench. A narrow excavation (in relation to its depth) made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom)is not greater than 15 feet. 2. Trench safety system requirements apply to larger open excavations if the erection of structures or other installations limits the space between the excavation slope and the installation to dimensions equivalent to a trench as defined. 3. Trench safety systems include both Protective Systems and Shoring Systems but are not limited to sloping, sheeting, trench boxes or trench shields, slide rail systems, sheet piling, cribbing,bracing, shoring, dewatering or diversion of water to provide adequate drainage. a. Protective System: A method of protecting employees from cave-ins, from material that could fall or roll from an excavation face or into an excavation, or from the collapse of an adjacent structure. b. Shoring System: A structure, which supports the sides of an excavation, to prevent cave-ins, maintain stable soil conditions, or to prevent movements of the ground affecting adjacent installations or improvements. c. Special Shoring: A shoring system meeting Special Shoring Requirements for locations identified on the Plans. 4. Competent Person-one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary,hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them. 07/2006 01570- 1 of 4 CITY OF PEARLAND TRENCH SAFETY SYSTEM 1.02 MEASUREMENT AND PAYMENT A Measurement for trench safety systems used on utility excavations is on a linear foot basis,measured along the centerline of the trench. Payment for trench safety systems includes payment for manholes and other line structures. B Unless indicated in as a Bid Item, no separate payment will be made for shoring systems under this Section. Include cost in Bid Items for trench safety systems. C If shown on the Plans and included in Section 00300—Bid Proposal as a separate Bid Item, Measurement and Payment for Special Shoring system installation for trench excavation is on a square foot basis, measured and completed in place. D Unless indicated as a Bid Item, no separate payment will be made for trench safety systems used on structural excavations under this Section. Include cost for trench safety system used on structural excavations in applicable structure installation. E Unless indicated as a Bid Item, no separate payment will be made for trench safety systems used on roadway excavation or.embankment under this Section. Include cost in applicable Sections. F Refer to Section 01200—Measurement&Payment Procedures. (111111k\. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit a safety plan specifically for the construction of trench excavation,excavation of utilities, excavation of structures, and embankment which fall under provisions of federal, state,or local excavation safety laws. Design the Trench Safety Plan to be in accordance with OSHA Standards -29CFR governing the presence and activities of individuals working in and around trench excavations, and in accordance with any Special Shoring requirements at locations shown on the Plans. Include in the plan, submittal of the contact information for the Competent Person C Have Shop Drawings for trench safety systems sealed, as required by OSHA, by a Professional Engineer, licensed by the State of Texas, retained and paid by the Contractor. 1.04 REGULATORY REQUIREMENTS A Install and maintain trench safety systems in accordance with the provision of Excavations,Trenching,and Shoring,OSHA Standards—29 CFR,Part 1926,Subpart P, as amended, including Final Rule, published in the Federal Register Vol. 54, No. 209 on Tuesday, October 31, 1989. The sections that are incorporated into these Technical Specifications,by reference,include Standard 1926.650—652. 07/2006. 01570-2 of 4 CITY OF PEARLAND TRENCH SAFETY SYSTEM B A reproduction of the OSHA Standards — 29 CFR included in Subpart P — "Excavations"from the Federal Register Vol.54,No.209 is available upon request to Contractors bidding on the Work. The Owner assumes no responsibility for the accuracy of the reproduction. The Contractor is responsible for obtaining a copy of this section of the Federal Register. C Include in the Trench Safety Program measures that establish compliance with the standard interpretation of the General Duty Clause, Section 5.(a)(1), of the Occupational Safety and Health Act of 1970—20 USC 654 which states,"Employers must shore or otherwise protect employees who walk/work at the base of an embankment from possible collapse." D Legislation that has been enacted by the State of Texas with regard to Trench Safety Systems is hereby incorporated,by reference,into these specifications. Under Texas Statutes, refer to Chapter 756 of the Health and Safety Code, SUBCHAPTER C. TRENCH SAFETY. E Reference materials,if developed for this Work,will be issued by the Engineer along with the Bid Documents, including the following: 1. Geotechnical information obtained for use in design of the trench safety system. 2. Special Shoring Requirements. 1.05 INDEMNIFICATION A Contractor shall indemnify and hold harmless the Owner,its employees, and agents, from any and all damages,costs(including,without limitation,legal fees,court costs, and the cost of investigation),judgments or claims by anyone for injury or death of persons resulting from the collapse or failure of trenches constructed under this Contract. B Contractor acknowledges and agrees that this indemnity provision provides indemnity for the Owner in case the Owner is negligent either by act or omission in providing for trench safety, including, but not limited to safety program and design reviews, inspections, failures to issue stop work orders, and the hiring of the Contractor. C Review of the safety program by the Engineer will only be in regard to compliance with the Contract Documents and will not constitute approval by the Engineer nor relieve Contractor of obligations under state and federal trench safety laws. 2.0 PRODUCTS - NotUsed 3.0 EXECUTION 3.01 INSTALLATION A Install and maintain trench safety systems in accordance with provisions of OSHA Standards—29 CFR. 07/2006 01570-3 of 4 CITY OF PEARLAND TRENCH SAFETY SYSTEM Cim6\ B Specially designed trench safety systems shall be installed in accordance with the Contractor's trench excavation safety program for the locations and conditions identified in the program. C Install Special Shoring at the locations shown on the Plans. D Obtain verification from a Competent Person,defined in this Section and as identified in the Contractor's Trench Safety Program, that trench boxes and other pre- manufactured systems are certified for the actual installation conditions. 3.02 INSPECTION A Conduct daily inspections by Contractor or Contractor's independently retained consultant, of the trench safety systems to ensure that the installed systems and operations meet OSHA Standards—29 CFR and other personnel protection regulations requirements. B If evidence of possible cave-ins or slides is apparent, immediately stop work in the trench and move personnel to safe locations until necessary precautions have been taken to safeguard personnel. C Maintain a permanent record of daily inspections. 3.03 FIELD QUALITY CONTROL A Verify specific applicability of the selected or specially designed trench safety systems to each field condition encountered on the Work. END OF SECTION 07/2006 01570-4 of 4 CITY OF PEARLAND PROJECT IDENTIFICATION SIGNS r-^� 1 Section 01580 PROJECT IDENTIFICATION SIGNS 1.0 GENERAL 1.01 SECTION INCLUDES A Project identification sign description. B. Installation. C. Maintenance and removal. 1.02 UNIT PRICES A. No separate payment will be made for design, fabrication, installation, and maintenance of project identification signs under this Section. Include cost of work performed under this Section in the pay item for Section 01505 - Mobilization. B. If changes to project identification signs are requested by the City Engineer to keep them current,payment will be made by change order. C. Skid-mounted signs shall be relocated as directed by the City Engineer at no additional cost to the City. Post-mounted signs shall be relocated once, if directed in writing by the City Engineer, at no additional cost to the City. If a post- mounted sign is relocated more than once at the written direction of the City Engineer, payment will be made by change order. 1.03 SYSTEM DESCRIPTION A. Sign Construction: Project identification signs shall be constructed of new materials and painted new for the project. Construct post-mounted signs as shown on Construction Sign Details. B. Appearance: Project identification signs shall be maintained to present a clean and neat look throughout the project duration. C. Sign Manufacturer/Maker: Experienced as a professional sign company. D. Sign Placement: Place signs at locations as directed by the City Engineer. The City Engineer will provide sign placement instructions at the Pre-construction Meeting. 1. A linear project is one involving paving, overlay, sewer lines, storm drainage, or water mains that run in the right-of-way over a distance. A linear project requires a project identification sign at each end of the construction site. 05/2007 01580-1 CITY OF PEARLAND PROJECT IDENTIFICATION SIGNS (1.16\ 2. Single Site or Building Projects: Provide one project identification sign. 3. Multiple Sites: Provide one project identification sign at each site. 4. Sign Relocation: As work progresses at each site, it may be necessary to move and relocate project identification signs. Relocate signs as directed in writing by the City Engineer. E. Alternate Skid-mounted Sign Construction: Post-mounted signs are preferred, but skid-mounted signs are allowed, especially for projects with noncontiguous locations where work progresses from one location to another. The skid structure shall be designed so that the sign will withstand a 60-mile-per-hour wind load directly to the face or back of the sign. Use stakes, straps, or ballast. Approval of the use of skid-mounted signs shall not release the Contractor from responsibility of maintaining a project identification sign on the project site and shall not make the City responsible for the security of such signs. 1.04 SUBMITTALS A. Submit shop drawings under provisions of Section 01350-Submittal Procedures. B. Show content, layout, lettering style, lettering size, and colors. Make sign and lettering to scale, clearly indicating condensed lettering, if used. 2.0 PRODUCTS 2.01 SIGN MATERIALS A. Structure and Framing: All sign materials shall be new. 1. Sign Posts: Use 4-inch by 4-inch treated wood posts, sized to fix top of sign at 6 FEET ABOVE GROUND. 2. Sign Supports and Skid Bracing: 2-inch by 4-inch wood framing material. 3. Skid Members: 2-inch by 6-inch wood framing material. 4. Fasteners: a. Use galvanized steel fasteners. b. Use 3/8-inch by 5-1/2-inch button head carriage bolts to attach sign to posts. Secure with nuts and flat head washers at locations as recommended by Sign Manufacturer. c. Cover button heads with white reflective film or paint to match sign background B. Sign and Sign Header: Use medium density overlaid marine plywood, minimum 1/2-inch thick. Use full-size 4-foot by 8-foot sheets for sign and a single piece for header to minimize joints; do not piece wood to fabricate a sign face. C. Paint and Primers: White paint used to prime surfaces and to resist weathering shall be an industrial grade, fast-drying, oil-based paint with gloss finish. Paint structural and framing members white on all sides and edges to resist weathering. 05/2007 01580-2 CITY OF PEARLAND PROJECT IDENTIFICATION SIGNS Paint sign and sign header material white on all sides and edges to resist weathering. Paint all sign surfaces with this weather-protective paint prior to adding any sign paint or adhesive applications. D. Colors: Follow criteria established by attached Exhibit 3.0 EXECUTION 3.01 INSTALLATION A. Install project identification signs within 10 calendar days after Date of Commencement. B. Erect signs where designated by the City Engineer at the Pre-construction Meeting or as described in part 1.03 of this Section. Position the sign in such a manner as to be fully visible and readable to the general public. C. Erect sign level and plumb. D. If mounted on posts, sink posts a minimum of 30 inches below grade in 10-inch diameter posthole. Stabilize posts with sharp sand or concrete to minimize lateral motion. Leave a minimum of 8 feet of post above existing grade for mounting of the sign and header. E. Erect sign so that the top edge of the sign, is no higher than 6 feet above existing grade. 3.02 MAINTENANCE AND REMOVAL A. Keep signs and supports clean. Repair deterioration and damage. B. Remove signs, framing, supports, and foundations to a depth of 2 feet upon completion of Project. Restore the area to a condition equal to or better than before construction. END OF SECTION 05/2007 01580-3 First L.�r Impression . - De ignen&Manufactured of Diversified Serge 8315 INDUSTRIAL DRIVE PEARLAND TEXAS 77584 281.6485500 281-648.4648FAX CITY OF PEARLAND www.flrsirmpresslarisign.00m CITY LOGO PROJECT: PROJECT FOR CAPITAL IMPROVEMENTS City ofPearland Capital Improvement cirt-rs7 PROJECT NO. XXXXX ADDRESS: e-IX i:lA`dVi,F171.4; I^If FOB Shop i "1 PROJECT SCHEDULE: XXXX XXX XXXX XXX CITY/STATE: alWraitINl;poafjVW; BUDGET $XXX XXX XXX Pearland, Texas Cfp, ? V Y1 F a' ltf_iell ar DATE: 11.20.09 ` J.i' `` 5-'"' ''�:' '� `' ARCHITECT: XXXX XXXXX XXXXX FILENAME: VOO 17hY nglj6 Mr Ifr-�$YA� city of pealland capital improvement sC. :.>p,�il� . I i r^rtc CONTRACTOR: XXXX XXXXX.XXXXXXXXX (cS eir.1 f P0Ae4 1.619 4 reiwerc THIS UNPUBLISHED DESIGN ISTHEPROPERTYOF J,r`JLYVti w_ww.cityofpearland.comlprojects FIRST DAPRESSWNSGIIIDESIGN,INC,ANGLSSURIOfim FORMA FERSONAL USE N COMECFION WRHA PRO,ECF WEARSPIANNiNG FOR YOU.ITISNOIT06E0001ED,COPER REPRODUCED,EXHHIIED,DSSOVIATEO,ORSEN}7FNIOANYCRE OUTCOEOFYOURORGRQATIONWRHOUTWIN1TENPERNISSBCN OFFBSTGIPRESSJONSIGN8CES,CJ IIC.VIOLATIOIOFTI,EAROVE +/4 "P EIfLLRESFIRSTIRPRFS90H OCOLLECTFEESFCRARTAED Description: you `' "Pt STAFFTNEPROFLTiiEcogrona Single sided 1/2" MArine Grade MDO plywood with alkyd enamel finishes. t .EN= .;Oi (INITIALS) Computer cut premium vinyl letterin 1JP� I 120 VOLT ELECTRICAL SERVICE 9 E � �D. CUENT TO PROVIDE ALL PRIMARY DI �tal full color rint (� ELECTRICAL SERVICES TO THE SIGN g p g Alf, I g 9 UNLESS OTHERWISE SPECIFIED. Install on two 4"x4" treated posts at'24" minimum depth._ CLIENT APPROVAL Current City Logo CITY OF PEARLAND MATERIAL AND EQUIPMENT Section 01600 MATERIAL AND EQUIPMENT 1.0 GENERAL 1.01 SECTION INCLUDES A Requirements for transportation, delivery, handling, and storage of materials and equipment. B References to Technical Specifications: 1. Section 01566—Source Controls for Erosion& Sedimentation 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this work is a component. 1.03 PRODUCTS A Products: Means material,equipment,or systems forming the Work. Does not include machinery and equipment used for preparation,fabrication,conveying and erection of the Work. Products may also include existing materials or components designated for reuse. B Do not reuse materials and equipment,designated to be removed, except as specified by the Contract Documents. C Provide equipment and components from the fewest number of manufacturers as is practical, in order to simplify spare parts inventory and to allow for maximum interchangeability of components. For multiple components of the same size,type or application, use the same make and model of component throughout the Work. 1.04 TRANSPORTATION A Make arrangements for transportation, delivery, and handling of equipment and materials required for timely completion of the Work. B Transport and handle products in accordance with instructions. C Consign and address shipping documents to the proper party giving name of Project, street number, and City. Shipments shall be delivered to the Contractor. 1.05 DELIVERY A Arrange deliveries of products to accommodate the Construction Schedule and in ample time to facilitate inspection prior to installation. Avoid deliveries that cause lengthy storage or overburden of limited storage space. 07/2006 01600- 1 of 3 CITY OF PEARLAND MATERIAL AND EQUIPMENT B Coordinate deliveries to avoid conflict with Work and conditions at the Project Site and to accommodate the following: 1. Work of other contractors or the Owner. 2. Limitations of storage space. 3. Availability of equipment and personnel for handling products. 4. Owner's use of premises. C Have products delivered to the Project Site in manufacturer's original, unopened, labeled containers. D Immediately upon delivery, inspect shipment to assure: 1. Product complies with requirements of Contract Documents. 2. Quantities are correct. 3. Containers and packages are intact; labels are legible. 4. Products are properly protected and undamaged. 1.06 PRODUCT HANDLING A Coordinate the off-loading of materials and equipment delivered to the Project Site. If necessary to move stored materials and equipment during construction, Contractor shall relocate materials and equipment at no additional cost to the Owner. B Provide equipment and personnel necessary to handle products, including those provided by the Owner, by methods to prevent damage to products or packaging. C Provide additional protection during handling as necessary to prevent breaking scraping, marring, or otherwise damaging products or surrounding areas. D Handle products by methods to prevent over bending or overstressing. E Lift heavy components only at designated lifting points. F Handle materials and equipment in accordance with Manufacturer's recommendations. G Do not drop, roll, or skid products off delivery vehicles. Hand carry or use suitable materials handling equipment. 1.07 STORAGE OF MATERIAL A Store and protect materials in accordance with manufacturer's recommendations and requirements of these Technical Specifications. Control storage of potential water pollutants in conformance with Section 01566 — Source Controls for Erosion & Sedimentation. B Make necessary provisions for safe storage of materials and equipment. Place loose soil materials,and materials to be incorporated into the Work to prevent damage to any part of the Work or existing facilities and to maintain free access at all times to all parts of the Work and to utility service company installations in the vicinity of the Work. 07/2006 01600-2 of 3 CITY OF PEARLAND MATERIAL AND EQUIPMENT C Keep materials and equipment neatly and compactly stored in locations that will cause a minimum of inconvenience to other contractors, public travel, adjoining owners, tenants, and occupants. Arrange storage in a manner to provide easy access for inspection. D Provide adequately ventilated, watertight storage facilities with floor above ground level for materials and equipment susceptible to weather damage. E Restrict storage to areas available on the construction site for storage of material and equipment as shown on Plans or approved by the Project Manager. F Provide off-site storage and protection when on-site storage is not adequate. G Do not use lawns, grass plots, or other private property for storage purposes without written permission of the owner or other person in possession or control of such premises. Damage to lawns,sidewalks,streets or other improvements shall be repaired or replaced to the satisfaction of the Project Manager. H Protect stored materials and equipment against loss or damage. I Store materials in manufacturers'unopened containers. J Materials delivered and stored along the line of the Work shall be not closer than 3 feet to any fire hydrant. Public and private drives and street crossings shall be kept open. K The total length which materials may be distributed along the route of construction at any one time is 1000 lineal feet, unless otherwise approved in writing by the Project Manager. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 07/2006 01600-3 of 3 CITY OF PEARLAND PRODUCT OPTIONS AND SUBSTITUTIONS Section 01630 PRODUCT OPTIONS AND SUBSTITUTIONS 1.0 GENERAL 1.01 SECTION INCLUDES A Options for making product or process selections. B Procedures for proposing equivalent construction products or processes,including pre- approved, and approved products or processes C References to Technical Specifications: 1. Section 01350—Submittals 1.02 SUBMITTALS A Make Submittals required by this and related Sections under the provisions of Section 01350—Submittals. 1.03 DEFINITIONS A Product: Means,materials,equipment,or systems incorporated into the Work.Product (I1W does not include machinery and equipment used for production,fabrication,conveying, and erection of the Work. Products may also include existing materials or components designated for re-use. B Process: Any proprietary system or method for installing system components resulting in an integral, functioning part of the Work. For this Section, the word Product includes Processes. 1.04 SELECTION OPTIONS A Pre-approved Products: Products of certain manufacturers or suppliers are designated in the Technical Specifications as"pre-approved". Products of other manufacturers or suppliers will not be acceptable under this Contract and will not be considered under the submittal process for approving alternate products. B Approved Products: Products of certain manufacturers or suppliers designated in the Technical Specifications followed by the words "or approved equal". Approval of alternate products not listed in the Technical Specifications may be obtained through provisions of this Section.and Section 01350—Submittals. The procedure for approval of alternate products is not applicable to Pre-approved Products. C Product Compatibility: To the maximum extent possible,provide products that are of the same type or function from a single manufacturer,make, or source. Where more than one choice is available as a Contractor's option, select a product which is (111.6\ compatible with other products already selected, specified, or in use by the Owner. 07/2006 01630- 1 of 3 CITY OF PEARLAND PRODUCT OPTIONS AND SUBSTITUTIONS 1.05 CONTRACTOR'S RESPONSIBILITY A Furnish information the Engineer deems necessary to judge equivalency of the alternate product. B Pay for laboratory testing as well as any other review or examination cost needed to establish the equivalency between products which enables the Engineer to make such a judgment. C If the Engineer determines that an alternate product is not equivalent to that named in the Technical Specifications,the Contractor shall furnish one of the specified products. 1.06 ENGINEER'S REVIEW A Alternate products may be used only if approved in writing by the Engineer. The Engineer's determination regarding acceptance of a proposed alternate product is final. B Alternate products will be accepted if the product is judged by the Engineer to be equivalent to the specified product or to offer substantial benefit to the Owner. C The Owner retains the right to accept any product deemed advantageous to the Owner, and similarly, to reject any product deemed not beneficial to the Owner. 1.07 SUBSTITUTION PROCEDURE A Collect and assemble technical information applicable to the proposed product to aid in determining equivalency as related to the Approved Product specified. B Submit a written request for a product to be considered as an alternate product along with the product information within fourteen(14)days after the Effective Date of the Agreement. C After the submittal period has expired, requests for alternate products will be considered only when a specified product becomes unavailable because of conditions beyond the Contractor's control. D Submit 5 copies of each request for alternate product approval. Include the following information: 1. Complete data substantiating compliance of proposed substitution with Contract Documents. 2. For products: a. Product identification, including manufacturer's name and address. b. Manufacturer's literature with product description, performance and test data, and reference standards. c. Samples, as applicable. d. Name and address of similar projects on which product was used and date of installation. Include the name of the Owner, Architect/Engineer, and installing contractor. 07/2006 01630-2 of 3 CITY OF PEARLAND PRODUCT OPTIONS AND SUBSTITUTIONS (limb\ 3. For construction methods: a. Detailed description of proposed method. b. Shop Drawings illustrating methods. 4. Itemized comparison of proposed substitution with product or method specified. 5. Data relating to changes in Construction Schedule 6. Relationship to separate contracts, if any. 7. Accurate cost data on proposed substitution in comparison with product or method specified. 8. Other information requested by the Engineer. E Approved alternate products will be subject to the same review process as the specified product would have been for Shop Drawings, Product Data, and Samples. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 07/2006 01630-3 of 3 CITY OF PEARLAND FIELD SURVEYING Section 01720 FIELD SURVEYING 1.0 GENERAL 1.01 SECTION INCLUDES A Requirements for surveyors and surveys. B Procedures pertaining to survey control points and reference points. C References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01760—Project Record Documents 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 QUALITY CONTROL A Conform to State of Texas laws for surveys requiring licensed surveyors. Employ a land surveyor acceptable to Engineer. 1.04 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit to Engineer the name, address, and telephone number of Surveyor before starting survey work. C Submit documentation verifying accuracy of survey work on request. 1.05 PROJECT RECORD DOCUMENTS A Maintain a complete and accurate log of control and survey work as it progresses. B Submit Record Documents under provisions of Section 01760 — Project Record Documents. 1.06 EXAMINATION A Verify locations of survey control points prior to starting Work. B Notify Engineer immediately of any discrepancies discovered. 07/2006 01720- 1 of 2 CITY OF PEARLAND FIELD SURVEYING Clh\ 1.07 SURVEY REFERENCE POINTS A Control datum for survey is that established by Owner-provided survey and indicated on Plans. B Locate and protect survey control points,including property corners,prior to starting site work. Use caution to preserve permanent reference points during construction. C The Contractor shall not reset; nor cause to be,reset, lost, disturbed, or damaged; control points. Promptly notify Engineer of disturbance or damage to any control point(s). D Notify Engineer 48 hours in advance of need for relocation of reference points due to changes in grades or other reasons. E Report promptly to Engineer the loss or destruction of any reference point. F Any re-staking of control points lost,disturbed,or damaged by Contractor's operations will be provided by Owner at Contractor's expense. G Employ a Registered Public Land Surveyor to reset any missing,disturbed,or damaged monumentation. 1.08 SURVEY REQUIREMENTS A Utilize recognized engineering survey practices. B Establish a minimum of two permanent bench marks on Project Site, referenced to established control points. Record locations, with horizontal and vertical data, on Project Record Documents. C Establish and record in survey notes elevations,lines and levels to provide quantities required for Measurement and Payment and to provide appropriate controls for the Work. Locate and lay out by instrumentation and similar appropriate means: 1. Site improvements including pavements; stakes for grading; fill and topsoil placement; utility locations, slopes, and invert elevations. 2. Grid or axis for structures. 3. Mounumented Baseline. D Verify periodically layouts by same means. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 07/2006 01720-2 of 2 CITY OF PEARLAND STARTING SYSTEMS Section 01750 STARTING SYSTEMS 1.0 GENERAL 1.01 SECTION INCLUDES A Starting systems. B Demonstration and instructions. C Testing, adjusting, and balancing. D References to Technical specifications: 1. Section 01350—Submittals 2. Section 01430—Contractor's Quality Control 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit a written report that equipment or system has been properly installed and is functioning correctly. 2.0 PRODUCTS - Not Used 3.0 EXECUTION 3.01 PREPARATION A Contractor shall conduct all start-up operations under this Contract in conformance with Section 01430—Contractor's Quality Control. B Coordinate schedule for start-up of various equipment and systems. C Notify Engineer 7 days prior to startup of each item. D Verify that each piece of equipment or system has been checked for proper lubrication, drive rotation, belt tension, control sequence, or other conditions which may cause damage. E Verify that tests, meter readings, and specified electrical characteristics agree with those required by the equipment or system manufacturer. 07/2006 01750- 1 of 2 CITY OF PEARLAND STARTING SYSTEMS F Verify wiring and support components for equipment are complete and tested. G Execute start-up under Contractor's supervision in accordance with manufacturer's instructions. H When specified in individual specification sections,require manufacturer to provide authorized representative to be present at site to inspect,check and approve equipment or system installation prior to and during start-up,and to supervise placing equipment or system in operation. 3.02 DEMONSTRATION AND INSTRUCTIONS A Demonstrate operation and maintenance of products to Owner two weeks minimum prior to date of Substantial Completion. B Utilize operation and maintenance manuals as basis for instruction. Review contents of manual with Owner in detail to explain all aspects of operation and maintenance. C Demonstrate start-up, operation, control, adjustment, trouble-shooting, servicing, maintenance, and shutdown of each item of equipment at agreed-upon times, at equipment location. D Prepare and insert additional data in operations and maintenance manuals when need for additional data becomes apparent during instruction. 3.03 TESTING,ADJUSTING,AND BALANCING A Contractor shall start, test, adjust, balance, and provide reports on all installed equipment as provided for in this section. B Owner may also appoint, employ, and pay for services of an independent firm to perform testing, adjusting, and balancing. Reports will be submitted by the independent firm to the Owner indicating observations and results of the tests and indicating compliance or non-compliance with specified requirements and with the requirements of the Contract Documents. C Owner's employment of an independent firm shall not relieve the Contractor's responsibility under this section. END OF SECTION 07/2006 01750-2 of 2 CITY OF PEARLAND PROJECT RECORD DOCUMENTS Section 01760 PROJECT RECORD DOCUMENTS 1.0 GENERAL 1.01 SECTION INCLUDES A Maintenance and Submittal of Record Documents and Samples. B References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01770—Contract Closeout 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this and related Sections under the provisions of Section 01350—Submittals. 1.04 MAINTENANCE OF DOCUMENTS AND SAMPLES A Maintain one copy of Record Documents at the Project Site in accordance with Section 00700—General Conditions of Agreement, 3.02 "Keeping Plans and Specifications Accessible". B Store Record Documents and Samples in field office if a field office is required by Contract Documents, or in a secure location. Provide files,racks, and secure storage for Record Documents and Samples. C Label each document "PROJECT RECORD" in neat, large, printed letters. D Maintain Record Documents in a clean,dry,and legible condition. Do not use Record Documents for construction purposes. E Keep Record Documents and Samples available for inspection by Engineer. 1.05 RECORDING A Record information concurrently with construction progress. Do not conceal any work until required information is recorded. B Plans, Change Orders, and Shop Drawings: Legibly mark each item to record all actual construction, or "as built" conditions,including: 1. Measured horizontal locations and elevations of underground utilities and appurtenances,referenced to permanent surface improvements. 07/2006 01760- 1 of 2 CITY OF PEARLAND PROJECT RECORD DOCUMENTS 2. Elevations of underground utilities referenced to bench marks utilized for the Work. 3. Field changes of dimension and detail. 4. Changes made by modifications. 5. Details not on original Plans. 6. References to related Shop Drawings and Modifications. C Record information with a red pen or pencil on a set of drawings indicated as the Record Document Set,provided by Engineer. 2.0 PRODUCTS - Not Used 3.0 EXECUTION A Deliver Record Documents and Samples to Owner in accordance with Section 01770— Contract Closeout. END OF SECTION 07/2006 01760-2 of 2 CITY OF PEARLAND CONTRACT CLOSEOUT Section 01770 CONTRACT CLOSEOUT 1.0 GENERAL 1.01 SECTION INCLUDES A Closeout procedures including final submittals such as operation and maintenance data, warranties, and spare parts and maintenance materials. B References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01760—Project Record Documents 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1.04 CLOSEOUT PROCEDURES A Comply with Section 00700 — General Conditions of Agreement regarding Final Completion and Final Payment when Work is complete and ready for Engineer's final inspection. B Provide Record Documents under provisions of Section 01760 — Project Record Documents. C Complete or correct items on punch list,with no new items added. Any new items will be addressed during warranty period. D The Owner will occupy portions of the Work as specified in Section 00700—General Conditions of Agreement. E Contractor shall request Final Inspection at least two weeks prior to Final Acceptance. 1.05 FINAL CLEANING A Execute final cleaning prior to final inspection. B Clean debris from drainage systems. C Clean Project Site; sweep paved areas,rake clean landscaped surfaces. 09/2009 01770- 1 of 2 CITY OF PEARLAND CONTRACT CLOSEOUT (111 D Remove waste and surplus materials, rubbish, and temporary construction facilities from the Project Site following the final test of utilities and completion of the Work. 1.06 OPERATION AND MAINTENANCE DATA A Submit Operations and Maintenance data under provisions of Section 01350 — Submittals. 1.07 WARRANTIES A Provide one original of each warranty from Subcontractors, Suppliers, and Manufacturers. B Provide Table of Contents and assemble warranties in 3-ring/D binder with durable plastic cover. C Submit warranties prior to Final Application for Payment. 1. Warranties shall commence in accordance with the requirements of Section 00700—General Conditions of Agreement, 1.09 "Substantially Completed". 2.0 PRODUCTS - Not Used 3.0 EXECUTION Contractor shall diligently pursue completion of the items and activities contained in the Contract Close Out and Project Record Document sections of the project manual. Notwithstanding any performance of warranty work,the work of Contract Closeout shall be complete within thirty (30) days of the date of Final Completion and Acceptance of the work. END OF SECTION 09/2009 01770-2of2 CITY OF PEARLAND SITE PREPARATION Section 02200 SITE PREPARATION 1.0 GENERAL 1.01 SECTION INCLUDES A Removal of topsoil, stripping and stockpiling, clearing and grubbing. B Removal and disposal of waste materials, excess materials, debris and trash. C Removal of obstructions. D Excavation and fill. E Salvaging of designated item. F References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 01450—Testing Laboratory Services 4. Section 01500—Temporary Facilities and Controls 5. Section 02255—Bedding,Backfill and Embankment Material 6. Section 02330—Embankment 7. Section 01140—Contractor's Use of Premises G Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM D 4318, "Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils" 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. B If Site Preparation is included as a Bid Item,measurement will be based on the Units shown in Section 00300 — Bid Proposal and in accordance with Section 01200 — Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350— Submittals. B Submit embankment material sources and product quality information in accordance this Section. 07/2006 02200- 1 of 4 CITY OF PEARLAND SITE PREPARATION (11 , 1.04 TESTING A Testing and analysis of product quality, material sources, or field quality shall be performed by an independent testing laboratory provided by the Owner under the provisions of Section 01450 — Testing Laboratory Services and as specified in this Section. 1.05 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct .all construction operations under this Contract in conformance with the practices described in Section 01500—Temporary Facilities and Controls. 2.0 PRODUCTS 2.01 MATERIALS A Contractor shall provide materials used as embedment, backfill, back-dressing, and embankment identified on the Plans in accordance with Section 02255 — Bedding, Backfill and Embankment Material. 3.0 EXECUTION �`�` 3.01 CLEARING AND GRUBBING. \\ A Clear Project Site of trees,shrubs,and other vegetation,except for those designated by Owner to be left standing. B Use only hand methods for grubbing inside drip line of trees designated to remain. C Completely remove stumps,roots,and other debris protruding through ground surface. 1. On areas required for roadway, channel, or structural excavation, remove stumps, 2" diameter or larger limbs and roots, to depth of 2 feet below lower elevation of excavation. 2. On areas required for embankment construction, remove 2" diameter limbs, stumps and roots to depth of 2 feet below ground surface 3. Trees and stumps may be cut off as close to natural ground as practicable on areas which are to be covered by at least 3 feet of embankment D Fill depressions caused by clearing and grubbing operations with satisfactory soil material, unless further excavation or earthwork is indicated. 1. Place fill material in horizontal layers not exceeding 6 inches loose depth,and thoroughly compact to density equal to adjacent original ground. E Complete operations by bulldozing,blading, and grading so that prepared area is free of holes,unplanned ditches, abrupt changes in elevations and irregular contours, and preserve drainage of area. 1. Blade entire area to prevent ponding of water and to provide drainage,except (1111 in areas to be immediately excavated 07/2006 02200-2 of 4 CITY OF PEARLAND SITE PREPARATION 3.02 TOPSOIL STRIPPING AND STOCKPILING A Obtain approval of topsoil quality before excavating and stockpiling. B Excavate topsoil for esplanades and areas to receive grass or landscaping from areas to be further excavated. C Topsoil Stripping: 1. Remove growths of grass from areas before stripping. 2. Topsoil is defined as surface soil found of depth of not less than 4 inches. 3. Strip topsoil to depths encountered. 4. Perform stripping in a manner to prevent intermingling of topsoil with underlying sterile subsoil and remove objectionable materials,including clay lumps, stones over 2 in. in diameter, weeds, roots, leaves, and debris. 5. Where trees are designated by Owner to be left standing,stop topsoil stripping at extreme limits of tree drip line to prevent damage to main root system. D Topsoil Stockpiling: 1. Stockpile in areas designated on Plans. 2. Construct storage piles to freely drain surface water. 3. Cover storage piles,if required to prevent wind-blown dust. 4. Stockpile topsoil to depth not exceeding 8 feet. Stockpile in a manner to prevent erosion. 3.03 UNSUITABLE MATERIAL A Undercut, remove, and replace material which Engineer designates as unsuitable for subsequent construction. B Material used to replace unsuitable material shall be suitable material from site excavation or as indicated on Plans. 3.04 EXCAVATION AND FILL A Depressed site areas shall be filled using material from high areas, insofar as practicable. B When fill obtained from high areas is exhausted, fill to indicated rough grade elevations under roadways with"Structural Fill"and open areas not under structures or roadways with "General Fill", or as indicated on Plans. C Place and compact fill in accordance with Section 02330—Embankment. 3.05 SALVAGEABLE ITEMS AND MATERIAL A Items designated by Engineer to be salvaged are to be carefully removed,so as to cause no damage to the salvaged items and delivered to Owner's storage yard. 07/2006 02200-3 of 4 CITY OF PEARLAND SITE PREPARATION Clui6\ 3.06 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. END OF SECTION 07/2006 02200-4 of 4 CITY OF PEARLAND SITE DEMOLITION Section 02220 SITE DEMOLITION 1.0 GENERAL 1.01 SECTION INCLUDES A Demolishing and removing existing pavements, structures, equipment and materials only to the extent as indicated on the Plans. B Removing concrete paving, asphaltic concrete pavement, and base courses. C Removing concrete curbs, concrete curb and gutters, sidewalks and driveways. D Removing pipe culverts and sewers. E Removing miscellaneous structures of wood, plastics, metals, concrete, masonry, or combination of concrete and masonry, etc. F Disposing of demolished materials and equipment. G References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals rTh 3. Section 01500—Temporary Facilities and Control 4. Section 01100—Summary of Work 5. Section 01730—Cutting and Patching 6. Section 01140—Contractor's Use of Premises 7. Section 01562—Waste Material Disposal 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item, no separate payment will be made for removing and disposing of existing pavement and structures under this Section. Include cost for removing and disposing of existing pavement and structures in Bid Items for which this Work is a component. B If indicated as a Bid Item, measurement will be as follows: 1. Measurement for removing and disposing of concrete base and surfacing,and removing asphaltic surfacing,is on a square yard basis measured between lips of gutters. 2. Measurement for removing and disposing of cement stabilized shell base course, with or without asphalt surfacing, is on a square yard basis. 3. Measurement for removing and disposing of concrete base and surfacing with curbs,is on a square yard basis measured from back to back of curbs. Payment includes removal of all base,asphaltic surfacing,concrete pavement,esplanade curbs, curb and gutters, and paving headers. 04/2008 02220- 1 of 5 CITY OF PEARLAND SITE DEMOLITION (1111"k\ 4. Measurement for removing and disposing of concrete pavement is on a square yard basis measured from back to back of curbs. 5. Measurement for removing and disposing of monolithic curb and gutter, removing monolithic concrete curb,and removing concrete curb,is on a lineal foot basis measured along the face of the curb. 6. Measurement for removing and disposing of concrete sidewalk and driveway is on a square yard basis. 7. Measurement for removing and disposing of miscellaneous concrete and masonry removal is on a cubic yard basis of the structure in place. 8. Measurement for removing and disposing of pipe culverts and sewers is on a lineal foot basis for each diameter of type of pipe removed. 9. Measurement for removing and disposing of unlisted materials shall be on the lump sum basis. C No payment will be made for work outside maximum payment limits indicated on Plans, or in areas removed for Contractor's convenience. D Refer to Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350— Submittals. B Submit proposed methods, equipment, materials and sequence of operations for demolition. Describe coordination for shutting off,capping,and removing temporary utilities. Plan operations to minimize temporary disruption of utilities to existing facilities or adjacent property. C Submit proposed demolition and removal schedule for approval. Notify Engineer in writing at least 48 hours before starting demolition. D Submit an approved copy of demolition schedule to Engineer prior to commencement of demolition operations. E Obtain a permit for building demolition, as required. 1.04 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices described in Section 01500—Temporary Facilities and Controls. B The Contractor shall be responsible for safety and integrity of adjacent structures and shall be liable for any damage due to movement or settlement. Provide proper framing and shoring necessary for support. Cease operations if an adjacent structure appears to be endangered. Resume demolition only after proper protective measures have been taken. 04/2008 02220-2 of 5 CITY OF PEARLAND SITE DEMOLITION 1.05 OWNERSHIP OF MATERIAL AND EQUIPMENT T) A Materials and equipment designated for reuse or salvage are listed in Section 01100— Summary of Work. Protect items designated for reuse or salvage from damage during demolition, handling and storage. Restore damaged items to satisfactory condition. B Materials and equipment not designated for reuse or salvage become the property of the Contractor. 1.06 STORAGE AND HANDLING A Store and protect materials and equipment designated for reuse until time of installation. B Deliver and unload items to be salvaged to storage areas indicated on Plans. C Remove equipment and materials not designated for reuse or salvage and all waste and debris resulting from demolition from site. Remove material as work progresses to avoid clutter. 2.0 PRODUCTS 2.01 EQUIPMENT AND MATERIALS FOR DEMOLITION A Use equipment and materials approved as prescribed in this Section, 1.03"Submittals'. B Use of a"drop hammer"must have the Engineer's prior approval. 3.0 EXECUTION 3.01 EXAMINATION A Prior to demolition, make an inspection with Engineer to determine the condition of existing structures and features adjacent to items designated for demolition. B Engineer will mark or list existing equipment to remain the property of the Owner. C Do not proceed with demolition or removal operations until after the joint inspection and subsequent authorization by Engineer. D Stop demolition and notify Engineer if underground fuel storage tanks, asbestos, PCB's, contaminated soils, or other hazardous materials are encountered. 3.02 UTILITY SERVICES A Follow rules and regulations of authorities or companies having jurisdiction over communications, pipelines, and electrical distribution services. B Notify and coordinate with utility company and adjacent building occupants when temporary interruption of utility service is necessary. 04/2008 02220-3 of 5 CITY OF PEARLAND SITE DEMOLITION C When required by the Work, cutting, patching, and fitting of Work to existing facilities,accommodating installation or connection of Work with existing facilities,or uncovering Work for access, inspection, or testing shall be performed in accordance with Section 01730—Cutting and Patching 3.03 MECHANICAL WORK ITEMS A Mechanical removals consist of dismantling and removing existing piping, pumps, motors,water tanks,equipment and other appurtenances. It includes cutting,capping, and plugging required to restore use of existing utilities. B Remove existing process,water, chemical,gas,fuel oil and other piping not required for new work. Take out piping to the limits shown or to a point where it will not interfere with the new work. Piping not indicated to be removed or which does not interfere with new work shall be removed to the nearest solid support,capped,and the remainder left in place. Purge chemical and fuel lines and tanks. Verify that such lines are safe prior to removal or capping. C Where piping that is to be removed passes through existing walls,cut and cap piping on each side of the wall. Use cap appropriate for pipe material to be capped. Provide fire-rated sealant for walls classified as fire-rated. D When underground piping, which is not located in the public right-of-way, is to be altered or removed,cap the remaining piping. Abandoned underground piping may be left in place unless it interferes with new work or is shown or specified to be removed. Piping less than 15 inches in diameter may be plugged and abandoned in place. For piping 15 inches in diameter and greater to be abandoned,fill with sand,pressure grout or other approved method and plug with concrete or brick masonry bulkhead. E Remove waste and vent piping to points shown. Plug pipe and cleanouts and plugs. Where vent stacks pass through an existing roof that is to remain,remove the stack and patch the hole in the roof,making it watertight. Comply with requirements of existing roof installer so as to maintain roof warranty. F Conform to applicable codes when making any changes to plumbing and heating systems. 3.04 ELECTRICAL WORK ITEMS A Electrical removals consist of disconnecting and removing existing switchgear, distribution switchboards,control panels,bus duct,conduits and wires,panel boards, lighting fixtures, and miscellaneous electrical equipment. B Remove existing electrical equipment and fixtures to prevent damage to allow continued operation of existing systems and to maintain the integrity of the grounding systems. 04/2008 02220-4 of 5 CITY OF PEARLAND SITE DEMOLITION C Remove poles and metering equipment, if designated for removal on the Plans. Coordinate electrical removals with the power company, as necessary. Verify that power is properly de-energized and disconnected. D Where shown or otherwise required, remove wiring in underground duct systems. Verify function of wiring before disconnecting and removing. Plug ducts which are not to be reused at entry to buildings. E Changes to electrical systems shall conform to applicable codes. 3.05 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. B Remove from the site all items contained in or upon the structure not designated for reuse or salvage in accordance with this Section and Section 01562—Waste Material Disposal. C Follow method of disposal as required by regulatory agencies. END OF SECTION 04/2008 02220-5 of 5 CITY OF PEARLAND ADJUSTING MANHOLES,INLETS,AND VALVE BOXES Section 02633 ADJUSTING MANHOLES,INLETS,AND VALVE BOXES 1.0 GENERAL 1.01 SECTION INCLUDES A Adjusting elevation of manholes, inlets, and valve boxes to new grades. B References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 03300—Cast-in-Place Concrete 4. Section 02542—Concrete Manholes and Accessories 5. Section 02318—Excavation and Backfill for Utilities 6. Section 02910—Topsoil 7. Section 02921 —Hydromulch Seeding C Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM C 270, "Standard Specification for Mortar for Unit Masonry" (� 1.02 MEASUREMENT AND PAYMENT A Measurement for adjusting utility structures to grade is on a lump sum basis for: 1. Adjusting manholes. 2. Adjusting inlets. 3. Adjusting valve boxes. B Refer to Section 01200-Measurement and Payment Procedures. C Make Submittals required by this Section under the provisions of Section 01350— Submittals. 2.0 PRODUCTS 2.01 CONCRETE MATERIALS A For cast in place concrete,refer to Section 03300—Cast-in-Place Concrete. B For precast concrete manhole sections and adjustment rings,refer to Section 02542— Concrete Manholes and Accessories. C For mortar mix, conform to requirements of ASTM C 270, Type S using Portland cement. 07/2006 02633- 1 of 3 CITY OF PEARLAND ADJUSTING MANHOLES,INLETS,AND VALVE BOXES 2.02 CAST IRON ADJUSTING RINGS A For cast iron adjusting rings, refer to Section 02542 — Concrete Manholes and Accessories. 2.03 PIPING MATERIALS A For riser pipes and fittings, refer to applicable piping materials specifications in Sections 02542—Concrete Manholes and Accessories. 3.0 EXECUTION 3.01 EXAMINATION A Examine existing structure, valve box,frame and cover or inlet box,frame and cover or inlet,and piping and connections for damage or defects that would affect adjustment to grade. Report such damage or defects to the Engineer. 3.02 ESTABLISHING GRADE A Coordinate grade related items with existing grade and finished grade or paving, and relate to established bench mark or reference line. 3.03 ADJUSTING MANHOLES AND INLETS A Elevation of manhole or inlet can be raised using precast concrete rings or metal adjusting rings. Use of brick for adjustment to grade is prohibited. Elevation of manhole or inlet can be lowered by removing existing masonry,adjusting rings or the top section of the barrel below the new elevation and then rebuilding or raising the elevation to the proper height. B Grout inside and outside adjusting ring joints. C Salvage and reuse cast iron frame and cover or grate. D Protect or block off manhole or inlet bottom using wood forms shaped to fit so that no debris or soil falls to the bottom during adjustment. E Set the cast iron frame for the manhole cover or grate in a full mortar bed and adjust to the established elevation. In streets, adjust covers to be flush to 1/8 inch above pavement. F Verify that manholes and inlets are free of visible leaks as a result of reconstruction. Repair leaks in a manner subject to the Engineer's approval. 3.04 ADJUSTING VALVE BOXES A If usable, salvage and reuse valve box and surrounding concrete block. 07/2006 02633-2 of 3 CITY OF PEARLAND ADJUSTING MANHOLES,INLETS,AND VALVE BOXES ("116.\. B Remove and replace 6 inch ductile iron riser pipe with suitable length for depth of cover required to establish the adjusted elevation to accommodate actual finish grade. C Reinstall in-kind adjustable valve box and riser piping plumbed in vertical position. Provide minimum 6 inches telescoping freeboard space between riser pipe top butt end and interior contact flange of valve box for vertical movement damping. D After valve box has been set, aligned, and adjusted so that top lid is level with final grade, pour a 24 inch by 24 inch by 8 inch thick concrete pad around valve box. Center valve box horizontally within concrete slab. 3.05 BACKFILL AND GRADING A Backfill the area of excavation surrounding each adjusted manhole, inlet, and valve box and compact according to requirements of Section 02318 — Excavation and Backfill for Utilities. B Grade the ground surface to drain away from each manhole and valve box. Place earth fill around manholes to the level of the upper rim of the manhole frame. Place earth fill around the valve box concrete block. C In unpaved areas,grade surface at a uniform slope of 1 to 5 from the manhole frame to natural grade. Provide a minimum of 4 inches of topsoil conforming to requirements of Section 02910—Topsoil and seed in accordance with Section 02921—Hydromulch Seeding. END OF SECTION 07/2006 02633-3 of 3 CITY OF PEARLAND LANDSCAPE IRRIGATION Section 02811 LANDSCAPE IRRIGATION 1.0 GENERAL 1.01 SECTION INCLUDES A Pipe and fittings, valves, sprinkler heads and accessories. B Control system. C References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 02931 —Landscape and Tree Planting 4. Section 01310—Coordination and Meetings D Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM D 2564,"Standard Specification for Solvent Cements for Poly (Vinyl Chloride) (PVC)Plastic Piping Systems 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item, no separate payment will be made for landscape irrigation under this Section. Include cost in Bid Items for which this Work is a component. B If landscape irrigation is included as a Bid Item, measurement will be based on the Units shown in Section 00300—Bid Proposal and in accordance with Section 01200— Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350— Submittals. B Submit manufacturer's data and details for landscape irrigation system. 1.04 SYSTEM DESCRIPTION A Electric solenoid controlled underground irrigation system. B Source Power: 120 volt 1.05 QUALIFICATIONS A Manufacturer: Company specializing in performing the work of this section with minimum three years documented experience. 07/2006 02811 - 1 of 5 CITY OF PEARLAND LANDSCAPE IRRIGATION B Installer: Installer must be a licensed irrigator. 1.06 REGULATORY REQUIREMENTS A Conform to applicable code for piping and component requirements. 1.07 PRE-INSTALLATION CONFERENCE A Convene one week prior to commencing work of this Section. 1.08 COORDINATION A Coordinate work under provisions of Section 02931 —Landscape and Tree Planting. B Coordinate the work with site landscape grading and delivery of plant life. 1.09 EXTRA MATERIALS A Furnish extra components listed as Extra Items in Section 00300—Bid Proposal. 1. Two sprinkler heads of each type and size. 2. Two valve box keys. 3. Two wrenches for each type head core and for removing and installing each type head. 2.0 PRODUCTS 2.01 PIPE MATERIALS A Pipe shall be continuously and permanently marked with Manufacturers name, size, schedules,type, and working pressure. B PVC Pipe: 200 psi pressure rated upstream from controls, 160 psi downstream; solvent welded sockets rubber gasketed joints. C Fittings: Type and style of connection to match pipe. D Solvent Cement: ANSI/ASTM D 2564 for PVC pipe and fittings. E Sleeve material: 4" schedule 40 PVC. 2.02 OUTLETS A Manufacturers or approved equal: 1. Rainbird Model 180 4. 2. Rainbird Model 1812 3. Hunder Model PGP B Rotary type sprinkler head: Pop-up type with screens; fully adjustable for flow and pressure; size as indicated;with letter or symbol designating degree of arc and arrow (41.6\ indicating center of spray pattern. 07/2006 02811 -2 of 5 CITY OF PEARLAND LANDSCAPE IRRIGATION C Spray Type Sprinkler Head: Pop-up head with full circle, half circle, third circle, n quarter circle and square pattern. 2.03 VALVES A Manufacturers or approved equal: 1. Rainbird Model PEB Series B Gate Valves: Bronze construction, non-rising stem, and sized to line. C Backflow Preventers: FEBCO 765 Bronze body construction,reduced pressure zone or pressure vacuum braker type. D Valve Box and Cover: rectangular 10" x 14" or 9" round. 2.04 CONTROLLER A Manufacturers or approved equal: 1. Rainbird Model RC1260C B Valves: Electric solenoid wiring including required fittings and accessories. C Wire conductors: color coded. 3.0 EXECUTION 3.01 EXAMINATION A Verify site conditions under provisions of Section 01310—Coordination and Meetings. B Verity location of existing utilities. C Verify that required utilities are available, in proper location, and ready for use. 3.02 PREPARATION A Piping layout indicated is diagrammatic only. Route piping to avoid plants, ground cover, and structures. B Layout and stake locations of system components. C Review layout requirements with other affected work. Coordinate locations of sleeves under paving to accommodate system. 3.03 TRENCHING A Trench and filling as required. B Trench size: 1. Minimum Cover Over Installed Supply Piping: 18 inches. 2. Minimum Cover Over Installed Branch Piping: 12 inches. 07/2006 02811 -3 of 5 CITY OF PEARLAND LANDSCAPE IRRIGATION 3. Minimum Cover Over Installed Outlet Piping: 12 inches. C Trench to accommodate grade changes. D Maintain trenches free of debris,material, or obstructions that may damage pipe. E Do not leave trenches open overnight. 3.04 INSTALLATION A Install pipe, valves, controls, and outlets in accordance with manufacturer's instructions. B Connect to utilities. C Set outlets and box covers at finish grade elevations. D Install control wiring as required. Provide 10 inch expansion coil at each valve to which controls are connected, and at 100 ft intervals. Bury wire beside pipe. Mark valves with neoprene valve markers containing locking device. Set valve markers in 160 psi PVC pipe risers exiting from top of valve to finish grade. E After piping is installed,but before outlets are installed and filling commences,open valves and flush system with full head of water. \_ F Coordinate pipe installation with conduit installation. 3.05 FIELD QUALITY CONTROL A Field inspection and testing will be performed. B Prior to filling,test system for leakage for whole system to maintain 100 psi pressure for one hour. 3.06 FILLING A Provide 3 inch sand cover over piping.fill trench and compact to subgrade elevation. Protect piping from displacement. 3.07 ADJUSTING A Adjust control system to achieve time cycles required. B Change and adjust head types for full water coverage as directed. 3.08 DEMONSTRATION A Provide system demonstration. 07/2006 02811 -4 of 5 CITY OF PEARLAND LANDSCAPE IRRIGATION B Instruct Owner's personnel in operation and maintenance of system, including adjusting of sprinkler heads. Use operation and maintenance material as basis for demonstration. END OF SECTION 07/2006 02811 -5 of 5 CITY OF PEARLAND WOOD FENCES AND GATES Section 02820 WOOD FENCES AND GATES 1.0 GENERAL 1.01 SECTION INCLUDES A Fence framework, material components, and accessories. B Excavation for post bases, concrete foundation for posts, and installation of gates. 1. Manual gates and related hardware. C References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals D Referenced Standards: 1. American Society of Testing and Materials (ASTM) 2. American Association of State Highway' and Transportation Officials (AASHTO) 1.02 MEASUREMENT AND PAYMENT A Measurement for fencing shall be on a linear foot basis for type and height noted, measured and complete in place. B Measurement for gates shall be per each, complete in place. C Payment includes all labor and materials required to complete installation as indicated on Plans. D Refer to Section 01200--Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Shop Drawings: Indicate plan layout, spacing of components, post foundation dimensions,hardware anchorage, and specific description of material components. C Product Data: Provide data on material components including posts, rails, bracing, accessories, fittings, and hardware. 1.04 SYSTEM DESCRIPTION A Fence height shall be as indicated on Plans or as noted to match height of existing. B Line post spacing shall not exceed 10 feet, or as shown on Plans. 07/2006 02820- 1 of 3 CITY OF PEARLAND WOOD FENCES AND GATES C Provide bracing as appropriate for structural integrity. D Concrete posts in the ground at a depth of, at least, lh the height of the fence. E The diameter of the post hole shall be, at least, 1 'h times that of the post,or as shown on Plans. 1.05 QUALIFICATIONS A Company specializing in installation of the products specified in this Section with minimum three years experience. 1.06 FIELD MEASUREMENTS A Verify that field measurements are as indicated on Shop Drawings. 2.0 PRODUCTS A When the Work entails replacement of fence structures, the products shall match or exceed the quality of existing. 3.0 EXECUTION 3.01 INSTALLATION '"� A Install fence in accordance with the directions of the manufacturer and these Technical I Specifications. B Use a Class B concrete base or better to set posts into the ground. Allow concrete to cure for at least 7 days before attaching remainder of fence. C Where type of material applies,use standard fence stretching equipment to stretch the fencing before tying it to the rails and posts. Repeat the stretching and tying operations about every 100 feet. Use bottom tension wire where specified on Plans. D Erect gates so they swing or slide in the appropriate direction. Provide gate stops as required. Secure hardware,adjust, and leave in perfect working order. Adjust hinges and diagonal bracing so that gates will hang level. Adjust rollers and guides of sliding gates so that gates are level. E Accommodate contour of ground as indicated on Plans. F Where new fence joins an existing fence, set a corner post and brace post at the junction, or tie in as directed on Plans. G Nuts and bolts shall be in conformance with ASTM-A307 and shall be galvanized in accordance with AASHTO M232. J 07/2006 02820-2 of 3 CITY OF PEARLAND WOOD FENCES AND GATES H Other hardware indicated on Plans shall be in accordance with ASTM Standards. END OF SECTION (1111.6 (1111 07/2006 02820-3 of 3 CITY OF PEARLAND CHAIN LINK FENCES AND GATES Section 02821 CHAIN LINK FENCES AND GATES 1.0 GENERAL 1.01 SECTION INCLUDES A Fence framework, fabric, and accessories. B Excavation for post bases, concrete foundation for posts and center drop for gates. 1. Manual gates and related hardware. C References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals D Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM A 570, "Standard Practice for Roof System Assemblies Employing Steel Deck, Performed Roof Insulation, and Bituminous Built-Up Roofing" b. ASTM A 1011, "Standard Specification for Steel, Sheet, and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low Alloy and High- Strength Low Alloy with Improved Formability" c. ASTM A 307, "Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength" 2. American Association of State Highway and Transportation Officials (AASHTO) 1.02 MEASUREMENT AND PAYMENT A Measurement for fencing shall be on a linear foot basis for height noted,measured and complete in place. B Measurement for gates shall be per each, complete in place. C Payment for chain link fences and gates includes all labor and materials required to complete installation as indicated on Plans. D Refer to Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 07/2006 02821 - 1 of 4 n CITY OF PEARLAND CHAIN LINK FENCES AND GATES B Shop Drawings: Indicate plan layout, spacing of components, post foundation dimensions,hardware anchorage, and schedule of components. C Product Data: Provide data on fabric, posts, accessories, fittings and hardware that indicates that items match or exceed the quality of existing. 1.04 SYSTEM DESCRIPTION A Fence Height shall be as indicated on Plans or as noted to match height of existing. B Extension arms for barbed wire shall match existing. C Line Post Spacing shall not exceed 10 feet, or as shown on Plans. 1.05 QUALIFICATIONS A Manufacturer: Company specializing in manufacturing the products specified in this Section with minimum three years experience. 1.06 FIELD MEASUREMENTS A Verify that field measurements are as indicated on Shop Drawings. 2.0 PRODUCTS (11116, 2.01 GALVANIZED FENCING A Fence fabric shall be No. 9 steel wire, hot galvanized after weaving, to match or exceed existing. B Framework shall be hot-dipped galvanized with a minimum coating of 2 ounces/sf,or one ounce/sf plus 30 micrograms/square inch chromate conversion coating. C Line posts shall be 2" and conform to ASTM A 570 Grade 45 steel or ASTM A 569, cold rolled steel. All posts shall have spherical plugs. D End corner, angle, and pull posts shall be 2 1//2" and conform to ASTM A 570 Grade 45 steel or ASTM A 569 for steel pipe. E Top rails shall be 1.65 x 1.25 inch formed C-section;or 1.6 inch round ASTM A 569, 1.35 lbs/ft;or one 5/8 inch outside diameter steel pipe,2.27 lbs/ft. Top rails shall pass through openings provided for that purpose in post tops. F Fabric ties shall be hog rings, galvanized steel wire not less than 9-ga with a zinc coating of not less than 1.2 ounces/sf. G Bolts and nuts shall be in conformance with ASTM A 307 and shall be galvanized in accordance with AASHTO M232. 07/2006 02821 -2 of 4 CITY OF PEARLAND CHAIN LINK FENCES AND GATES H Install horizontal braces fabricated of one 5/8 inch,2.271b copper bearing steel pipe at all corner, gate, and end posts. I All posts to have malleable iron top caps. J Bottom tension wire shall be#7 gauge wire. K Gates shall be either swing or slide as shown on the plans. Swing gates shall be hinged to swing 90 degrees from closed to open or hinged to swing 180 degrees from close to open. Slide gates shall be roller type with no vertical obstructions. All gate leaves shall have intermediate members and diagonal stress rods as required for rigid construction and shall be free from sag or twist. All gates shall be fitted with vertical extension arms or shall have frame end number extended to carry barbed wire. Gate posts for gates shall be 4-inch, 9.1 lb pipe. Gate frames shall be made of 2-inch outside diameter,castings. Fabric shall be the same as for the fence. Gates shall have malleable iron ball and socket hinges, catches, stops and padlocks with 3 keys each. Posts for single gates shall be the same as end posts. 3.0 EXECUTION 3.01 INSTALLATION A Install chain link fence in accordance with the directions of the manufacturer and these Specifications. B Install line fence posts at not more than loft centers and concreted at least 36 inches x 12"diameter into the ground in a Class B concrete base. Allow concrete to cure for at least 7 days before erecting remainder of fence. Fasten fabric to line posts with wire ties spaced about 14 inches apart and to top rail spaced about 24 inches apart. C Use standard chain link fence stretching equipment to stretch the fabric before tying it to the rails and posts. Repeat the stretching and tying operations about every 100 feet. D Erect gates so they swing or slide in the appropriate direction. Provide gate stops as required. Secure hardware,adjust,and leave in perfect working order. Adjust hinges and diagonal bracing so that gates will hang level. Adjust rollers and guides of sliding gates so that gates are level. E At small natural or drainage ditches where it is not practical for the fence to conform to the contour of the ground, span the opening below the fence with wire fastened to stakes of required length. The finished fence shall be plumb, taut, true to line and ground contour. When directed, stake down the chain link fence at several points between posts. 07/2006 02821 -3 of 4 CITY OF PEARLAND CHAIN LINK FENCES AND GATES F Where new fence joins an existing fence, set a corner post and brace post at the junction and brace as directed. If the connection is made at other than the corner of the new fence the last span of the old fence shall contain a brace. END OF SECTION ` 07/2006 02821 -4 of 4 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING Section 02931 7 LANDSCAPE AND TREE PLANTING 1.0 GENERAL 1.01 SECTION INCLUDES A Furnishing all plants and trees, labor, equipment, appliances and materials for landscape and tree planting. Rough and finish grading is part of the landscape work. B References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 02910—Topsoil 4. Section 02921 —Hydromulch Seeding 5. Section 01562—Waste Material Disposal 1.02 MEASUREMENT AND PAYMENT A Measurement for Landscape Planting is on a Lump Sum. B Payment for Tree Planting is on lump sum basis for each tree planted. C Refer to Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit samples of the plants and grasses to be used for approval prior to installation. Inspection will be done on the project site. C Provide materials from the same source and of the same quality and variety as those inspected and approved. D Soils and/or compost materials must be approved at their source prior to delivery. 1.04 REFERENCES A ANSI Z 60.1 -Nursery Stock. B Federal Specification Q-P-166E-Peat,Moss; Peat, Humus; and Peat, Reed-Sedge. 1.05 SCHEDULE A The plant schedule gives quantities, scientific names, common names, sizes, and special remarks. r—"l 07/2006 02931 - 1 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING B The plant list conforms with Standardized Plant Names, 1942,and American Standard for Nursery Stock, 1949,revised January 2, 1969, as prepared by the American Joint Committee on Horticultural Nomenclature and the American Association of Nurserymen, Inc. C In case of discrepancies between the plant list and drawings, the working drawings shall govern. 1.06 DELIVERY AND STORAGE OF MATERIALS A Pack all plant material to provide protection against damage from wind, weather or other possible sources. Tie plants to prevent whipping when shipment is made by truck. B When shipment is made by rail, pack plants and ventilate cars as required to prevent sweating. C Provide a platform from all B&B root balls over 24 inches in diameter. D Store plants on the site as directed. E Spray with anti-transpirant at time of delivery in warm season months. Apply at rates in accordance with manufacturer's recommendations. F Ship trees with Certificates of Inspection as required by governing authorities. Label each tree and shrub with securely attached waterproof tag bearing legible designation of botanical and common name. Do not remove container grown stock from containers before time of planting. G Deliver packaged materials in fully labeled original containers showing weight, analysis and name of manufacturer. Protect materials from deterioration during delivery, and while stored at Site. H Materials shall not be pruned prior to installation unless approved by the Engineer in writing. Do not bend or bind-tie trees or shrubs in such a manner as to damage bark, break branches, or destroy natural shape. Use protective covering during delivery. 1.07 SUBSTITUTIONS A Substitution of larger size or better grade than specified will be allowed,but with no increase in unit cost. B Substitution of an alternate species may be accepted upon written approval from the Engineer. 1.08 ACCEPTANCE AND APPROVAL A There will be no partial acceptance of grasses. 07/2006 02931 -2 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING B Upon Contractor's request,final approval will be made within 15 working days of date of notice to the Engineer if contracted work has been satisfactorily completed. C Final approval of grasses will be given when the following conditions are met: 1. There are no bare spots larger than 9 inches square. 2. The total area of bare spots does not exceed 5 percent of the entire grass area. 1.09 WARRANTY A Provide 1-year warranty on all plants and grasses. The warranty period commences after final completion. B Replace plants that fail during the warranty period according to the specifications governing the original plants. C Periodically inspect plants for proper watering and spraying, during warranty period. D Damage caused by natural hazards such as hail,high winds or storm is not covered by the warranty. E Plant materials and grasses which die due to normal insects or diseases are included in the warranty. F Existing in situ plant material required to be moved on the site will be protected under the warranty. G Contractor shall warrant trees against defects including death,unsatisfactory growth,or loss of shape due to improper pruning,maintenance, or weather conditions,for 1 year after completion of planting. Contractor shall plumb leaning trees during warranty period. H Remove and replace trees found to be dead during warranty period. Remove and replace trees which are in doubtful condition at end of warranty period,or if approved by the Engineer, extend warranty period for such trees for a full growing season. 1.10 SOIL ANALYSIS A Submit for approval an analysis of all soils obtained from off-site sources prior to delivery. B Analysis of existing soil is not required. 1.11 PLANT CERTIFICATES A Submit inspection certificates approved by the Engineer as required by law with the invoice for each shipment or order of stock: 1. Submit certificates to the Engineer for review in ample time to be reviewed and meet installation schedule. 07/2006 02931 -3 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING 1.12 PROTECTION OF PERSONS AND PROPERTY A Take all reasonable precautions to prevent injury to people and to avoid damage to existing structures,plants and grasses. Keep the area free of hazardous obstructions. B Construct barricades where necessary for the protection of persons and property. Mark all barricades with red and white paint and with red reflectors. Erect barricades in the following locations: 1. Areas dangerous to workmen and passersby. 2. Along adjoining property that requires protection. 3. Across streets and walks that are temporarily closed or rerouted. 4. Around plants and trees to be protected. C Excavations larger than 1 foot deep and 1 foot wide must be covered when not attended. D Existing trees which may be subject to damage must be protected by fencing or boxing. E During the course of planting operations, protect all installed plants and lawns from damage. If heavy equipment or materials must be moved across lawns,use planks or pontoons to protect the turf. Similarly protect walks across which heavy equipment must pass. 1.13 DEFINITIONS A In situ refers to any soil which is existing and in place on the project site at the time landscape work commences. B Establishment period refers to a period of 45 days after installation during which time 5 percent of the construction costs will be withheld. 1.14 QUALITY ASSURANCE A Landscaper shall be a firm specializing in landscape and planting work. B Do not make substitutions of approved trees unless approved in writing by the Engineer. If specified planting material is not obtainable, submit proof of non- availability together with proposal for use of equivalent material. Substitutions of larger size or better grade than specified will be allowed,but with no increase in unit price. 2.0 PRODUCTS 2.01 TOPSOIL A Topsoil: Conform to requirements of Section 02910-Topsoil. B Peat moss, bark, and fertilizer: Use material recommended by nursery for \11111**\ establishment of healthy stock after replanting. Moss shall conform to requirements of Federal Specification Q-P-166E. 07/2006 02931 -4 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING 2.02 FERTILIZER A Provide an inorganic commercial fertilizer which is uniform in composition, dry and free flowing, in original unopened containers, each bearing the manufacturer's guaranteed analysis. Caked, damaged or otherwise unsuitable fertilizer will not be accepted. 1. For lawns: 12-24-12. 2. For ground cover areas, shrub beds and tree holes: 20-10-5. 2.03 ADDITIVES A Adjustment of pH. For topsoil to attain the specified pH level, furnish raw, ground agricultural limestone containing not less than 85 percent calcium carbonate of which 50 percent will pass through a 100-mesh sieve and 90 percent through a 70-mesh sieve. Wait 2 months after planting before application of fertilizer. 1. following table is a guideline to establish the pounds of limestone needed per 1000 square feet of turf: LIMESTONE NEEDED PER 1000 SQUARE FEET SOIL PH SANDS,LOAMY SANDS SANDY LOAM CLAY LOAM,CLAY >6.0 0 0 0 5.1 - 6.0 50 75 100 <5.0 100 125 175 B Humus. Provide a rich humus material free of sticks, stones, weedy roots, or other foreign matter. Humus must have ample water holding capacity and plant food retention. Use a humus with a dark brown to black color. C Dressing Mulch. Provide pine or redwood bark that is evenly shredded,consisting of 90 percent organic matter, brown in color, and free of harmful minerals. Maximum particle size not to exceed 3 inches in diameter. D Sharp Sand. Obtain clean sharp sand of hard durable grains, free from dirt, organic matter or other impurities. Use sand with a grade between 0.05 mm and 2 mm. E Concrete Gravel. Provide clean, crushed stone consisting of hard, durable,uncoated particles free from injurious amounts of soft friable, thin or laminated pieces. Use gravel which conforms to ASTM C 33. The sieve size will be 3/4 inch, 90 to 100 percent passing. 2.04 CONSTRUCTION MATERIALS A Tree Guys: 1. Guy Wires. Use 10-gauge galvanized annealed iron wire. 2. Hose will be 2-ply, fiber-reinforced dull green rubber at least 3/4-inch diameter. 07/2006 02931 -5 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING 3. Turnbuckles will be galvanized, with a 3-inch minimum lengthwise opening and fitted with screw eyes. B Stakes: 1. For use in identifying tree and shrub locations. a. Use 1-inch x 2-inch pine, or equivalent, 18 inches long. b. Use waterproof marker for identification. 2. Where applicable for anchoring trees,use wood deadmen of at least 2 inches x 4 inches stock, 36 inches long and buried 3 feet. 3. For supporting guyed trees, use stakes that are of at least 2 inches x 4 inches stock, 36 inches long. Notch stakes for guy wires 2 inches from the top. 4. Use tree stakes that are of sound and durable quality capable of withstanding aboveground and underground conditions either "T" Post or Treated Lodge Poles. C Edging: 1. Provide 1/2-inch x 4 inches, Cypress or Treated Lumber headerboard. 2. Provide 1 inch x 2 inches x 12 inches, Cypress or Treated Lumber stakes. D Cloth for Balling Trees. Use burlap of jute weighing at least 7.2 ounces per square yard. Secure balled plants with 2-ply twine made of jute. E Paper for Wrapping Trees. Use first quality, 4-inch-wide bituminous impregnated tape, corrugated or crepe paper, specifically manufactured for tree wrapping and having qualities to resist insect infestation. F Materials for Flagging Trees: 1. Mark guyed trees with surveyors white plastic tape. 2. Use surveyors plastic tape for marking as follows. a. Red to be removed. b. Yellow to be transplanted. c. Green to remain. d. Blue to identify special handling. G Labels. Legibly label plants with durable labels that identify the plant by scientific and common name. Use waterproof ink. H Tree Seal. All pruning cuts,bruises,or scars over 3/4 inch in diameter on trees will be treated with a commercial tree wound dressing. I Polyethylene. Use virgin base,resin blended polyethylene sheeting with carbon black concentrate of 2.5 percent. 2.05 SPRAYS A Sterilization: 1. Use approved solution of Dyclomec 4G, or equal,for areas to be planted. (111"\, 2. Use Pramitol, or equal, for areas to be paved. 07/2006 02931 -6 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING B Herbicides: 1. Use an approved systemic non-selective,post emergent herbicide on specified areas to kill all vegetation. 2. Use Confront, or equal, for general control of broadleaf weeds in lawns. 3. Use Preemerg,Eptam,Dryclomec, or equal for ground cover. 4. Use an approved pre-emergent to control seed germination in specified areas. C Antitranspirant: 1. Use approved antitranspirant for all plant material that is stored and/or heeled- in on the site. 2. Use approved antitranspirant on all planted trees and shrubs. D Root Stimulant. Use approved root stimulant on all newly planted trees,shrubs,vines and/or ground cover areas. 2.06 PLANT CHARACTERISTICS A Provide plants which are true to type and name,and typical of their species or variety. Plants must have a normal, well-developed branch structure, with a vigorous root system, and must be generally sound and healthy. Use plants which are free from defects,including: 1. Disfiguring knots. 2. Sun scald. 3. Injuries. 4. Bark abrasions. 5. Plant diseases. 6. Insect eggs. 7. Borers. 8. Infestations. B Select well-formed plants balanced between height and spread typical of the species or variety with branches in normal position. Heading back plants to meet size limits will not be permitted. C Unless otherwise specified, all plants will be nursery grown and at least twice transplanted. Use plants which have been growing under similar climatic conditions to those of the project for at least 2 years prior to the date of the contract. Recently stepped-up plants will not be acceptable. All B&B or bare root plants must be freshly dug; heeled-in or cold storage plants will not be accepted. D Balled,bare root,and container-grown plants will conform to the definitions given in American Standards for Nursery Stock. E No tree will be accepted which has had leaders cut or damaged, or which has a thin, weak trunk and/or poorly formed tops. F Regardless of sample selection, a plant may be rejected at the site by the Engineer. rTh 07/2006 02931 -7 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING (111.6\. 2.07 NURSERY STOCK A Deciduous Trees. Provide trees which are straight and symmetrical and have a persistently preferred main leader. The crown must be in good overall proportion to the entire height of the tree. Where a clump is specified,a plant having a minimum of three stems originating from a common base at the ground line will be furnish. Measure trees by average caliper of trunk. 1. For trees up to 4 inches in diameter,measure caliper 6 inches above ground. 2. For trunks larger than 4 inches,measure caliper 12 inches above ground. B Evergreen Trees. Form of the top will be typical of the species and not unnaturally sheared or color-treated. Measure by average caliper. Caliper will be taken 6 inches above the ground on trees up to 4 inches in diameter and 12 inches above the ground on trees larger than 4 inches. C Vines and Ground Cover. Provide plants which are container-grown for sufficient time to ensure adequate root growth to hold the soil in place and retain the original shape when removed from the container. 2.08 I ELD-COLLECTED PLANTS A Field-collected plants must be grown in favorable locations that ensure fibrous roots and vigorous growth. Such plants will be selected on site by the Landscape architect. (11°'\ B Provide balls at least 1/3 greater in diameter than those specified for nursery stock. C If dug in dormant season and bare root is acceptable, the spread of roots must be at least 1/3 greater than the spread of roots for bare root nursery stock. 2.09 SEED A Seasonal Limitations: 1. Bermuda: a. Hulled seeds may be planted between October and March. b. Unhulled seeds may be planted between April and September. 2. Rye: a. Plant between October and February. B Bermuda. Provide common Bermuda seed that is extra-fancy, treated, lawn type. Deliver in original,unopened container showing weight,analysis,name of vendor and germination test results. Wet,moldy,or otherwise damaged seed will not be accepted. C Rye. Deliver annual Winter Rye seed in original unopened containers. Seed must be fresh, clean, and mixed in labeled proportions. As tested, minimum percentages of impurities and germination must be labeled. 2.10 HYDROMULCH A Provide hydromulch seeding as noted in Section 02921 —Hydromulch Seeding. 07/2006 02931 -8 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING 2.11 GRASS �7 A Obtain certified sod from an approved source. B Provide material which is true to type and name,and is typical of the species or variety. C Delivery: 1. Identify and tag sods with correct scientific and common name for each species. 2. Do not deliver more sods than can be planted within 8 hours. 3. Transport and deliver sods in/on pallets. 4. Protect sods against dehydration, overheating or contamination during transportation and delivery. 5. Cover unplanted sods with moistened burlap to prevent dehydration or overheating while awaiting installation. 6. Sods must be harvested within 12 hours of planting and arrive at the project site in a moist condition. D Products: 1. Material to be uniform in color, leaf texture and density. 2. Material to be graded No. 1, or better. 3. Uniform mowed height at time of harvesting material: 1-1/2 inches. 4. Inspected and certified free of diseases,nematodes,and undesirable insects by authorized representative of State Department of Agriculture. 5. Material will not be acceptable if it contains any quack grass,Johnson grass, poison ivy,nut grass,thistle, common bent grass, wild garlic,morning glory, perennial sorrell, or brome grass. 6. Turf will be considered weed free when found to contain less than 1 percent of dandelion,jimson weed, mustard, chickweed,per 100 square feet. 2.12 TREES A Provide container grown trees which are straight and symmetrical and have a persistently preferred main leader. The crown shall be in good overall proportion to the entire height of tree with branching configuration as recommended by ANSI Z60.1 for type and species specified. Where a clump is specified,a plant having a minimum of three stems originating from a common base at the ground line shall be furnished. Measure trees by average caliper of trunk as follows: 1. For trunks up to 4 inches or less in diameter,measure caliper 6 inches above top of root ball. 2. For trunks more than 4 inches, measure caliper 12 inches above top of root ball. 3. Caliper measurements shall be by diameter tape measure. Indicated calipers on plans are minimum. Averaging of plant calibers will not be allowed. B Trees shall conform to following requirements: 1. Healthy, vigorous stock, grown in a recognized nursery. 07/2006 02931 -9 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING 2. Free of disease, insects, eggs, larvae; and free of defects such as knots, sun- scald,injuries, abrasions, disfigurement, or borers and infestations. 2.13 WATER A Water shall be potable from municipal water supplies. 2.14 SOURCE QUALITY CONTROL A Notify Engineer,prior to installation, of location where trees that have been selected for planting may be inspected. Plant material will be inspected for compliance with following requirements. 1. Genus, species, variety, size and quality. 2. Size and condition of balls and root systems, insects, injuries and latent defects. 2.15 WORK CONDITIONS A Site Availability. Begin no landscape work where conflicting site work is incomplete or as otherwise directed by the Engineer. B Weather Restrictions. Stop all work during inclement weather such as drought,high winds, excessive rain, extreme heat, cold, or freeze. Obtain authorization before resuming work. rah\ 2.16 PLANTING PROCEDURES A Temporary Nursery. A temporary nursery may be used to store plants, but no more than 5 days before planting. Keep plants well watered and protected. 1. Immediately upon delivery, heel-in balled and burlapped (B&B) plants and spray all plants with an antitranspirant. Apply spray from top to bottom. Thoroughly cover plants,but not to the point of run-off. Spray block units and not individual plants. Use a low-pressure,fine-mist applicator. Spray at rates recommended in the manufacturer's directions. 2. Handle all balled and burlapped plants by the ball only. 3. Upon delivery,immediately heel-in bare root plants. Open bundles, separate plants, set roots in trenches, and cover with topsoil. Water plants with an approved root stimulant containing vitamin B. 4. Handle container plants by the container. 5. Handle ground cover plants in flats. Pack flats tightly together and sprinkle plants everyday. 6. Special plants so designated must be kept in an approved enclosure or planted the day of delivery. 7. Store soils and additives on approved platforms. B Digging and Handling: 1. The actual planting operation must proceed without delay and in a manner to rk‘ avoid undue drying of the in-situ soil or roots because of exposure to air and sun. Keep an ample supply of sawdust available to cover the roots of B&B 07/2006 02931 - 10 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING stock arriving from the storage nursery. Keep the roots well covered and moist ) until the plants can be placed in the final location and permanently planted. 2. Handle all plant stock with care to prevent injuries to the trunk,branches and roots. 3. Dig bare root plants when fully dormant. Keep all of the root system intact;do not prune the root system. However, any roots that are broken, crushed, or bruised must be cleanly cut back to sound wood. Make the cut on an angle so that the exposed end faces downward. Seal any cut root exceeding 3/4 inch in diameter with an approved tree wound dressing. 4. Balled and burlapped plants must have the root system encased in a firm,solid ball of natural earth, wrapped in burlap and tightly bound. Each ball must be of sufficient size to encompass all the fibrous feeding roots and not smaller than required by American Standards for Nursery Stock. The ball must remain firm and compact throughout the planting operations. 3.0 EXECUTION 3.01 SITE PREPARATION A Schedule work so that planting can proceed rapidly as portions of site become available. Plant trees after final grades are established and prior to planting of lawns, unless otherwise approved by Engineer in writing. If planting of trees occurs after seeding work,protect lawn areas and promptly repair damage to lawns resulting from tree planting operations. B Layout individual trees at locations shown on Drawings. In case of conflicts, notify lJ Engineer before proceeding with Work. Trees shall be staked and approved by Engineer prior to planting. C Existing Trees: 1. Protection: Protect tops,trunks and roots of trees to remain on the site. Before starting work, box, fence or otherwise protect trees subject to construction damage. Remove boxing when directed. Permit no stockpiles of heavy equipment within the branch spread of trees. 2. Removal: Remove trees marked for removal. Do not remove any tree without proper authorization. Stumps within 36 inches of final grade must also be removed. 3. Pruning and Surgery: Cut and trim trees only as directed; do not cut any tree without proper authorization. Trim existing trees of dead or diseased limbs. Cut limbs close to the trunk. Cover cuts over 3/4 inch in diameter with an approved tree would dressing. D Grading Around Trees. As required,fill or grade within the branch spread of trees to remain, observing the following requirements. 1. For trenching beneath trees, tunnel under the tree roots with careful hand digging. Where possible, avoid cutting or injuring roots. 2. Do not raise or lower the grade around an existing tree in any way unless so directed. 07/2006 02931 - 11 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING �+ E Placing Topsoil: 1. Disk,drag,harrow,or handrake subgrade. Scarify the subgrade to a depth of 1- 1/2 inches. Before placing topsoil, rake the subsoil surface clear of stones, wood,rubbish and other debris. Place no topsoil until the subgrade preparation has been approved. 2. Spread,rake, and compact topsoil to form a layer with a minimum depth of 4 inches in lawn areas and 6 inches in shrub areas. Place topsoil to conform to finished gradients as shown on the grading plan. 3. Remove spilled topsoil from curbs, gutters, and, paved areas and dispose of excess topsoil in accordance with requirements of Section 01562 — Waste Material Disposal. F In Situ Soil Preparation: 1. Cross-till in two directions all existing soil in designated areas to be planted,as follows: a. In lawn areas to a minimum depth of 6 inches. b. In shrub areas to a minimum depth of 10 inches. 2. Evenly broadcast fertilizers and soil additives and thoroughly work into soil. a. Smooth all tilled and amended areas to establish a rough gradient. b. Deeply irrigate all tilled and amended areas to thoroughly wet soil particles and promote settlement. c. After a settlement period of not less than 5 days,and before proceeding with any planting, smooth and rake as necessary to establish finish gradient as required. 3. In all areas which have been utilized for parking, storage or construction lots and/or where heavy equipment has been used, cross-rip the entire compacted areas in two directions to a depth of 10 inches before tilling and amending the soil as specified. A heavy float or drag harrow should be used to smooth all surface areas. a. Verify location of all underground utilities before ripping. b. Ripping teeth should not be set at more than 10-inch spacing. G Fertilizer. Evenly broadcast and work fertilizer into soil at the following rates: 1. Lawns: 1-1/2 N pounds per 1000 square feet. 2. Ground Cover, Shrub, and Tree Areas: 1-1/2 N pounds per 1000 square feet. H Additives: 1. Humus. Evenly broadcast and work into in situ soil at a rate of 1 cubic yard per 200 square feet. 2. Sharp Sand. Evenly broadcast and work into in situ soil at a rate of 1 cubic yard per 200 square feet. 3. Concrete Gravel. Utilize as a drainage course as shown on construction drawings. 3.02 PREPARATION OF PLANTING SOIL A Before mixing, clean topsoil of roots, plants, sod, stones, clay lumps, and other extraneous materials harmful or toxic to plant growth. 07/2006 02931 - 12 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING B Strip and utilize 4-inch layer of top soil,placed on esplanades under Section 02921— Hydromulch Seeding, for planting soil mixture. C Mix recommended soil amendments with topsoil at following rates: 1. Top soil: 50 percent. 2. Peat moss: 25 percent. 3. Well rotted Bark: 25 percent. 4. Fertilizer: Rate recommended by nursery. D Delay mixing of fertilizer if planting will not follow placing of planting soil within 48 hours, unless otherwise directed. E Incorporate amendments into the soil as a part of the soil preparation process prior to fine grading,fertilizing, and planting. Broadcast or spread amendments evenly at the specified rate over the planting area. Thoroughly incorporate amendments into the top 3 or 4 inches of soil until amendments are pulverized and have become a homogeneous layer of topsoil ready for planting. 3.03 PLANTING A Excavate pits, beds, or trenches with vertical sides and with bottom of excavation raised a minimum of 6 inches at center for proper drainage. Provide following minimum widths: 1. 15-gallon containers or larger, 2 feet wider than diameter of root ball. 2. 1- and 5-gallon containers, 6 inches wider than diameter of root ball. B When conditions detrimental to plant growth are encountered, such as unsatisfactory soil, obstructions, or adverse drainage conditions, notify the Engineer of such conditions before planting. C Deliver trees after preparations for planting have been completed and plant immediately. If planting is delayed more than 6 hours after deliver, set trees and shrubs in shade,protect from weather and mechanical damage,and keep roots moist by covering with mulch, burlap, or other acceptable means of retaining moisture, and water as needed. D Set root ball on undisturbed soil in center of pit or trench and plumb plant. Place plants at such a level that, after settlement, a natural relationship of plant crown with ground surface will be established. E When set,place additional backfill around base and sides of ball,and work each layer to settle backfill and eliminate voids and air pockets. When excavation is approximately 2/3 full,water thoroughly before placing remainder of backfill. Repeat watering until no more water is absorbed. F Dish top of backfill to allow for mulching. Mulch pits, trenches and planted areas. Provide not less than 4-inch thickness of mulch, work into top of backfill, and finish level with adjacent finish grades. Cover entire root ball. 07/2006 02931 - 13 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING G Prune, thin out and shape trees in accordance with standard horticultural practice. Prune trees to retain required height and spread. Unless otherwise directed in writing, do not cut tree leaders, and remove only injured and dead branches from flowering trees. Remove and replace excessively pruned or misformed stock resulting from improper pruning. H Inspect tree trunks for injury, improper pruning and insect infestation and take corrective measures. I Guy and stake trees immediately after planting. J Control dust caused by planting operations. Dampen surfaces as required. Comply with pollution control regulations of governing authorities. 3.04 PLANTING GRASS A Preparation: Prepare imported topsoil and/or in situ soil. Hand rake to remove all sticks, stones and clods larger than 1 inch. Apply the final grade but do not mechanically compact the soil. B Seed: 1. Evenly broadcast seed specified in 2.09 at the following rates: a. Bermuda: 1 pound per 1000 square feet b. Rye: 6 pounds per 1,000 square feet (1111116\ 2. Roll the entire seeded area in two directions with a dry/weighted roller. 3. Evenly top dress the entire seeded area with an approved sterilized commercial steer manure. Apply at 2 cubic feet per 100 square feet. 4. Lightly but thoroughly sprinkle the entire seeded area with water after top dress application. C Sod: 1. Use Bermuda,Buffalo, or St. Augustine sod in accordance with 2.11A. 2. Prepare soil in accordance with 3.03. 3. Apply eptam (or approved equal) to all areas to be sodded. Follow manufacturer's recommended rates and apply during soil preparation period. 4. Lay sod in a running bond pattern. Pieces should be consistently cut with joints tightly butted together. Water the in-place sod liberally and roll it in two direction with a heavy roller. Areas not level due to fluctuations in the sod depth should be covered and leveled with a 50/50 mix of sharp sand and topsoil. Fertilize in 6 weeks as directed by landscape Architect. 3.05 FIELD QUALITY CONTROL A The Engineer may reject unsatisfactory or defective material at anytime during progress of Work. Contractor shall remove rejected trees immediately from site and replace with specified materials. Plant material not installed in accordance with these Specifications will be rejected. Climh 07/2006 02931 - 14 of 15 CITY OF PEARLAND LANDSCAPE AND TREE PLANTING B An inspection to determine final acceptance will be conducted by the Engineer at the end of the 12 month maintenance period. Additional inspections will be conducted for extended warranty periods provided for in paragraph 1.07B. 3.06 CLEANING AND MAINTENANCE A Contractor shall maintain trees during planting operations and for a period of 12 months after completion of planting. B Water trees to full depth a minimum of once each week, or as required to maintain a healthy vigorous growth. C Prune, cultivate, and weed as required for healthy growth. Restore planting saucers. Tighten and repair stake and guy supports,and reset trees and shrubs to proper grades or vertical position as required. Restore or replace damaged wrappings. Spray as required to keep trees and shrubs free of insects and disease. 3.07 PROTECTION OF THE WORK A During planting work, keep pavements clean and work area in an orderly condition. B Protect planting work and materials from damage due to planting operations. Maintain protection during installation and maintenance period. Treat, repair, or replace damaged planting work as directed by the Engineer. C Dispose of excess soil and waste in accordance with requirements of Section 01562— Waste Material Disposal.On-site burning of combustible cleared materials will not be permitted. END OF SECTION 07/2006 02931 - 15 of 15 CITY OF PEARLAND PAVEMENT REPAIR Section 02980 PAVEMENT REPAIR 1.0 GENERAL 1.01 SECTION INCLUDES A Repairing streets,highways,driveways,sidewalks,and other pavements that have been cut, broken, or otherwise damaged during construction. B Repairing areas of failed paving in preparation for resurfacing. C References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 01500—Temporary Facilities and Controls 4. Section 02335—Subgrade 5. Section 02710—Base Course for Pavement 6. Section 02330—Embankment 7. Section 01140—Contractor's Use of Premises 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for pavement repair (111111 under this section. Include cost in Bid Items for which this Work is a component. B If pavement repair is included as a Bid Item,measurement is on a square yard basis. as follows: 1. Trench width plus 48 inches for utilities. 2. Trench width plus 10 feet for structures. 3. As marked in field for failed paving. C If provisions of this Section, 3.01D, require the limits of pavement repairs to be increased, then the payment limits shall be increased to the same extent. D No payment will be made for work outside payment limits, in areas that are not specifically called out as pay items and are incidental to the work or in areas removed for Contractor's convenience. E Refer to Section 01200-Measurement and Payment Procedures. 1.03 SUBMITTALS A Make submittals required by this section under the provisions of Section 01350 — Submittals. CI1116.\ 05/2008 02980- 1 of 3 CITY OF PEARLAND PAVEMENT REPAIR 1.04 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices described in Section 01500—Temporary Facilities and Controls. 2.0 PRODUCTS 2.01 MATERIALS A Provide materials of the same character as existing materials encountered in a cross section of the area to be repaired, or as approved by the Engineer. B Subgrade: Provide on site soil stabilized with lime, lime fly ash, etc., as required by the testing laboratory under the provisions of Section 02335—Subgrade. C Base: Provide new base material as required by applicable portions of Section 02710— Base Course for Pavement. D Pavement: Provide new paving materials as required by Technical Specifications of applicable surface course treatments. 3.0 EXECUTION 3.01 EXAMINATION A Verify backfill is complete before repairing pavement over installed utilities or structures. B Verify remaining subgrade is ready to support imposed loads before repairing areas of failed paving. 3.02 PREPARATION A For installation of utilities and utility appurtenances, saw cut and remove pavement (including base material for asphalt paving)24 inches beyond the width of excavation, unless otherwise indicated on Plans. B For installation of structures, saw cut and remove pavement(including base material for asphalt paving)5 feet beyond the width of excavation,unless otherwise indicated on Plans. C For repair of areas of failed paving, saw cut and remove pavement (including base material for asphalt paving) where indicated in the field or as directed by Engineer. Remove subgrade that is soft and yielding, or to depth as directed by Engineer. D If removed pavement is greater than one-half of pavement lane width, or within 18 inches of a longitudinal joint, on concrete pavement, replace pavement for full lane width or to nearest longitudinal joint as approved by the Engineer. 05/2008 02980-2 of 3 CITY OF PEARLAND PAVEMENT REPAIR E Protect edges of existing pavement to remain from damage during removals, utility placement,backfill,and paving operations. For concrete pavement,leave and protect minimum of 18 inches of undisturbed subgrade on each side of trench to support replacement slab. 3.03 EXAMINATION : A Verify backfill is complete before repairing pavement over installed utilities or structures. B Verify remaining subgrade is ready to support imposed loads before repairing areas of failed paving. 3.04 INSTALLATION A Replace subgrade with material specified in this Section, 2.01B. Place and compact under the provisions of Section 02330—Embankment for areas under future paving to match lines and grade of surrounding subgrade. B Replace base course with material specified in this Section,2.01C. Place and compact under the provisions of Section 02710—Base Course for Pavement to match lines and grade of surrounding base course. C Replace pavement with material specified in this Section,2.01D,and according to the (111.61 Technical Specifications of the particular surface course treatment so that a smooth, hard, well cemented surface, conforming to the lines and grade of the surround pavement is secured D For concrete pavement, install size and length of reinforcing steel and pavement thickness indicated on Plans. Place types and spacing of joints to match existing or as indicated on Plans. E Where existing pavement consists of concrete pavement with asphaltic surfacing, resurface with minimum 2-inch depth asphaltic pavement. F Repair state highway crossings in accordance with highway department permit and within 1 week after utility work is installed. 3.05 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. 3.06 PROTECTION OF THE WORK A Protect and maintain all pavement in good condition until completion of Work. (� B Replace pavement damaged by Contractor's operations at no cost to Owner. END OF SECTION 05/2008 02980-3 of 3