Loading...
R-2012-181-2012-12-10 RESOLUTION NO. R2012-181 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO ENTER INTO AN AMENDMENT OF A DEVELOPMENT AGREEMENT WITH SHS PARTNERS, LTD. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain Amendment to Development Agreement by and between the City of Pearland and SHS Partners, Ltd., a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest said Amendment to Development Agreement with SHS Partners, Ltd. PASSED, APPROVED and ADOPTED this the 10th day of December, A.D., 2012. TOM REID MAYOR ATTEST: 4GL1SFI* `►!''"SE ETARY =:�•. /\ ; tom: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Resolution No. R2012-181 Exhibit "A" OVERSIZE AGREEMENT This Agreement is entered into this 10 day of December , 2012, by and between the CITY OF PEARLAND, TEXAS, (hereinafter "City"), and SHS PARTNERS, LTD., a Texas limited partnership (hereinafter "Developer"). WHEREAS, Developer owns and/or is developing property which will be served by the proposed improvements shown on Exhibit"A" attached hereto (the "Developer's Property"); and WHEREAS, Developer plans to construct sanitary sewer improvement (hereinafter "Improvements"), necessary for the City to provide services to Developer's Property and to dedicate said Improvements to the City for operation and maintenance; and WHEREAS, City desires to cooperate with Developer to provide sanitary sewer service to Developer's Property, and at the same time, increase and improve City's capacity to serve other properties in the general area; and WHEREAS, City and Developer desire an agreement to set forth their respective responsibilities with regard to providing the Improvements. WITNESSETH : NOW THEREFORE, in consideration of the foregoing premises and other good and valuable consideration the receipt and sufficiency of which is hereby acknowledged, it is hereby agreed as follows: 1. Improvements a. Developer shall enter into one or more contracts to design and install the Improvements in accordance with Exhibit"A"attached hereto. b. To serve additional tracts,the City has requested and Developer agrees to oversize the Improvements as described in Exhibit"A." c. The estimated cost for the Improvements to serve Developer's requirements is $1,775,816.76. The estimated cost for the oversized Improvements as requested by the City is estimated to be $2,455,425.83. Therefore, the total estimated cost to be reimbursed by City to Developer is $679,609.07 ("City's Cost") as shown on Exhibit "A" attached hereto. Reimbursement shall be made in accordance with Section 4 hereof. d. The Improvements may be built in Phases and in accordance with the schedule described in Exhibit"B" attached hereto. 2. Upon approval of this Agreement Developer shall contract for the engineering costs for the design of the various Phases of the Improvements. The scope and fees of the contract shall be reviewed and approved by Developer and City prior to execution of the contract. 3. Upon approval of the plans and specifications for the Improvements by the City, Developer's engineers shall obtain competitive line item bids in accordance with Local Government Code Chapter 252 for the construction of the various Phases of the Improvements. The bids shall be reviewed by Developer and City, and Developer shall award contracts to the successful bidder upon approval of the bid by Developer and the City. Developer may reject any bid before submitting same to the City for approval. City reserves the right to reject any and all bids for the construction of the Improvements within ten (10) days following submission of the bids to the City for review. If the City fails to reject any bid during the ten (10) day review period, said bid shall be deemed approved by the City. 4. Following City's approval of the bids for each Phase of the Improvements, Developer shall award a contract to the successful bidder and issue a notice to proceed to the contractor for the construction of the Improvements within thirty (30) days following the approval of the bids (subject to any delays caused by the contractor's failure to sign the contract or produce any bonds or insurance certificates in a timely manner) and shall cause the contractor to complete the Improvements substantially in accordance with the plans and specifications. If Developer shall fail to cause construction of any Phase to commence as required in this section, the City, following thirty (30) days' written notice to Developer, shall have the right to terminate this Agreement without any further liability to developer except for the Phases of the Improvements that have been constructed or that are in the process of being constructed. Developer's engineer and the City Engineer or designee shall monitor the progress and workmanship of the contractor. Developer shall advance the funds necessary to pay the contractor for the work performed. Developer shall cause the City to be named as an additional obligee under any performance bond obtained by Developer to secure the construction of the Improvements. 5. The City shall reimburse the Developer for the City's Cost on a monthly percentage- completed basis in accordance with the following procedure: a. Engineering Costs i. Developer may submit to the City no more often than monthly its engineering, surveying, and soil testing invoices (collectively, "Engineering Costs") along with a letter from Developer stating the portion of the costs enumerated in the submittal that is allocable to the City and has been completed, along with the City's cost related hereto(collectively, an "Invoice"). ii. Within ten (10) days following a receipt of the Invoice, the City will review the progress of the engineering work associated with the Engineering Costs. iii. Within twenty (20) days following the City's review, the City shall approve the content of an Invoice, or disapprove in writing, stating the specific reasons therefor. Such approval shall not be unreasonably withheld. If the City fails to reject any Invoice during the twenty (10) day review period, said Invoice shall be deemed approved by the City. iv. Upon the City's approval of an Invoice, the City shall disburse to Developer the City's portion applicable to the Engineering Costs as set forth in the Invoice. b. Construction Costs i. In the event dewatering is encountered in the field for any Phase of the Improvements, the Geotechnical Engineer shall determine the depth at which the dewatering and wet sand construction is required. The City shall not be responsible for the dewatering and wet sand construction cost if the geotechnical engineer determines that the dewatering and wet sand construction items would have been required in the absence of the City's participation in oversizing the Improvements. The Developer shall not be responsible for the dewatering and wet sand construction cost if the Geotechnical Engineer determines that the dewatering and wet sand construction items would not have been required in the absence of the City's participation in oversizing the Improvements. ii. Developer may submit to the City no more often than monthly its contractor's draw request along with a letter from Developer's engineer stating the portion of the Improvements enumerated in the draw request that is allocable to the City and that have been constructed, along with the City's Cost relating thereto (collectively, a"Request"). iii. Within five (5) days following a receipt of a Request, the City shall inspect the progress of construction of the Improvements with respect to the City's Cost. iv. Within ten (10) days following the City's inspection, the City shall approve the content of a Request, or disapprove in writing, stating the specific reasons therefor. Such approval shall not be unreasonably withheld. If the City fails to reject any Request during the ten (10) day review period, said Request shall be deemed approved by the City. v. Upon the City's approval of a Request, the City shall disburse to Developer the portion of the City's Cost applicable to the construction of the Improvements as set forth in the Request, less any percentage of retainage pursuant to the terms of the contractor's contract with Developer, all of which retainage shall be disbursed by the City along with the final disbursement pursuant to the final Request, or at such earlier time as the City shall determine. c. The City shall not be obligated to reimburse Developer for more than 105% of the estimated City's Cost, unless the City Council shall approve such increase. 6. The Improvements shall be inspected, accepted, maintained and warranted by the parties, as applicable, in accordance with the City's Unified Development Code [the"UDC"]. 7. The initial term of this Agreement shall be for a period of forty-eight (48) months ("Initial Term"), commencing on the 1 1 day of 17.3v , 2012, and terminating on the ( 1-day of , 20 IS, provided, however, that this Agreement shall be automatically be renewed in one (1) year increments ("Renewal Terms"). Following the Initial Term, either party may terminate this Agreement during any Renewal Term by providing the other party ninety(90)days written notice. 8. This Agreement may only be amended, modified, or supplemented by written agreement and signed by both parties. 9. No assignment by a party hereto of any rights under or interests in this Agreement will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. Notwithstanding the foregoing, in the event Developer sells a portion of Developer's Property to Meritage Homes of Texas, LLC ("Meritage") and Meritage agrees to assume Developer's obligations hereunder in writing, then the City will consent to the assignment by Developer of its rights hereunder to Meritage. 10. Nothing herein is intended to supersede or waive any City ordinance or regulation pertaining to such construction. 11. Whenever possible, each provision of this Agreement shall be interpreted in such manner as to be effective and valid under applicable law, but if any provision of this Agreement is prohibitive or invalid under applicable law, such provision shall be ineffective to the extent of such provision or invalidity, without invalidating the remainder of such provision or the remaining provisions of this Agreement. 12. This Agreement shall be construed and enforced in accordance with and governed by the laws of the State of Texas. 13. This Agreement and all obligations created hereunder shall be performable in Brazoria and Harris Counties, Texas. 14. To accomplish execution of this Agreement, it may be executed in multiple counterparts. 15. DEVELOPER HEREBY RELEASES, ACQUITS, AND FOREVER DISCHARGES THE CITY,ITS OFFICERS, AGENTS, EMPLOYEES, SUCCESSORS, AND ASSIGNS FROM ANY AND ALL CLAIMS, DEMANDS, RIGHTS OR CAUSES OF ACTION OF WHATSOEVER CHARACTER OR NATURE, INCLUDING ATTORNEYS' FEES, ARISING FROM OR BY REASON OF ANY AND ALL BODILY OR PERSONAL INJURIES, INCLUDING DEATH AND MENTAL ANGUISH, DAMAGE TO PROPERTY AND THE CONSEQUENCES THEREOF WHICH MAY BE SUSTAINED BY CITY, ITS HEIRS, EXECUTORS, ADMINISTRATORS, SUCCESSORS, OR ASSIGNS AS A RESULT OF THE NEGLIGENT DESIGN BY DEVELOPER OF THE IMPROVEMENTS REFERENCED ABOVE, UNLESS CAUSED IN WHOLE OR IN PART BY THE NEGLIGENCE OF THE CITY, ITS OFFICERS, AGENTS, EMPLOYEES, SUCCESSORS, OR ASSIGNS. THE PROVISIONS OF THIS SECTION SHALL SURVIVE THE TERMINATION, EXPIRATION, OR CANCELLATION OF THIS AGREEMENT. 16. The Parties agree that any suit arising out of or related to this Agreement shall be filed in Brazoria or Harris Counties, Texas. 17. All notices which are required or may be given pursuant to this Agreement shall be in writing and shall be sufficient if delivered personally or by first class mail, postage prepaid, return receipt requested, or by a nationally recognized courier, to the parties and their attorneys at the addresses set out below or such other addresses as the parties or their attorneys may hereafter notify one another: If to City: City of Pearland Attn: Bill Eisen 3519 Liberty Drive Pearland, TX 77581 If to Developer: SHS Partners, Ltd. 6115 Skyline Dr., Suite A Houston,Texas 77057 Notice delivered in accordance with the terms hereof shall be effective upon receipt. 18. The parties hereby agree that this Agreement constitutes an agreement for providing goods and/or services to the City which is subject to the provisions of Subchapter I of Chapter 271 of the Local Government Code and any successor statute(s) (the"Code"). In accordance with Sections 271.152 and 271.153 of the Local Government Code, and only to the extent limited by the provisions of this section of this Agreement, the City hereby waives, to the maximum extent allowed by law, any constitutional, statutory or common law right to sovereign or governmental immunity from suit and expressly consents to be sued as provided by the Code. The parties agree that this section does not waive the City's sovereign immunity to suit for negligence or intentional torts. In witness whereof, the parties have hereunto set their hands and signatures on the date first above mentioned. SHS PARTNERS, LTD, a Texas limited partnership By: SHS Land Company, LLC, a Texas limited liability company, general partner By: RPDC, Inc., a Texas corpo .tion, •an._- dip By: Joh, Sant1., Pres'I t By: HFRE Management, LLP, Manager By: mes R. Holcomb, s authorized partner CITY OF PEARLAND, a Texas municipal corporation By: Bill Eisen, City Manager ATTEST: soy` ng Lo 1) y Sec ary .v /\ ,w,1w'•4Nt,&A 4 •�,,', THE STATE OF TEXAS § COUNTY OF HARRIS § This instrument was acknowledged before me on the day of September, 2012 by John Santasiero, President of RPDC, Inc., a Texas corporation, Manager of SHS Land Company, LLC, which is the general partner of SHS PARTNERS, LTD., a Texas limited partnership, on behalf of said limited partnership. I so�r�,,, ?,v.. �. ERIK W. HAALAND ��J� cE Notary Public,State of Texas [Seal] !/ 3� r ;` MY Commission Expires " ° November 26, 2014 Notary Public—State of Texas THE STATE OF TEXAS § COUNTY OF HARRIS § This instrument was acknowledged before me on the day of September, 2012 by James R. Holcomb, authorized partner of Texas HFRE Management, LLP, Manager of SHS Land Company, LLC, which is the general partner of SHS PARTNERS, LTD., a Texas limited partnership, on behalf of sAl limited partnership. [Seal] . Notary Public—State of Texas 'F BRIAN JARRARD ' �1Y I;OMMISSION EXPIRES July 30,2014 .tis'„ STATE OF TEXAS § COUNTY OF BRAZORIA § This instrument was acknowledged before me on this 10 day of December 2012, by Bill Eisen, City Manager of the City of Pearland, a Texas home rule municipality, on behalf of said municipality. 4\kailkAdefilL14- 9--C42-1-411-4-7-12-41 �r�A;t,A LSCA�;;v L R,;J;tlad Notary Public—State of Texas FO NOTARY PUBLIC STATE OF TEXAS My Co,nmiioc Expires 02-02-2013 HOLCOMB PROPERTIES COMPANY 1300 Post Oak Boulevard RECEIVED Suite 1110 Houston,Texas 77056 -- 713.843.0812 713.843.0819 FAX JAN 1 + 13 City oV Peorland Projects Dept TRANSMITTAL DATE: January 11,2013 Via US. Mail TO: Ms. Patty Patke City of Pearland 3519 Liberty Dr Pearland,TX 77581 FROM: SHS Partners RE: Riverstone Ranch Oversize Agreement Enclosed please find the following documents: DOCUMENT NO. OF COPIES COMMENTS Oversize Agreement 1 Executed Original For your records. Thank you. 2-8'FORCE MANS Exhibit A CONNECT TO EXISTING 12'FORCE MAIN 1 f.. \ i N SC. X (Qt LIFT STATION ll, EXISTING 10 FORCE MAIN 4*--- *- ,�,` -��,, ,4.14` • BARRY ROSE •�'',��+A ��,�I�I�I��I 181 CONN. W.W.TP. ���1 i� 14 `A. ',`�ip lia ��� /4l I Ills 04,1144f vi • *,'a I IIjIIIII,**740 t le '4,'\ALEGEND B-5 SEGMENT A CONNECTIONS i&I 60 SEGMENT B CONN. RIVERSTONE RANCH I600 . . SEGMENT C Irit CITY OF PEARL AND 400 TOTAL 2000 6 iEXHIBIT SHS PARTNERS.LTD. 1. SANITARY SEWER 6 B-8 TRUNK SEGMENTS $ RIVERSTONE RANCH B-9 AT CLEAR CREEK m B-10 LJA Engineering&Surveying,Inc.LA 2MN&Wpa(k Drive Phone 713. " B lI,1C 159 CONN. Suite600 Fax 713.953.5026 —o R o Houston,Texas 77042 FRN-F-1386 DATE:SEPTENBER 25.2012 JOB N0.1994-5020 Exhibit A PRELIMINARY PROBABLE ESTIMATE FOR: TO SERVE RIVERSTONE RANCH AT CLEAR CREEK SANITARY SEWER COST PRORATIONS BASED ON OVERSIZING INCLUDING CITY OF PEARLAND CITY OF PEARLAND JOB NO.2040-2150 HARRIS COUNTY MUD NO.509 DATE: October 15,2012 CITY OF PEARLAND STONE RIVER CAPITAL TOTAL COST SEGMENT A $105,601.06 $96,813.05 $202,414.10 SEGMENT B(First Phase 234 lots)B-I.B-2) $0.00 $122,676.62 $122,676.62 SEGMENT C $186,609.12 $72,386.20 $258,995.31 Subtotal First Phase Trunklines $292,210.17 $291,875.86 $584,086.03 Segment B Future $72,371.55 $440,241.83 $512,613.38 Litt Station $159,000.00 $636,000.00 $795,000.00 Total Construction Cost $523,581.72 $1,368,117.69 $1,891,699.41 CONTINGENCY(I %) $52,358.17 $136,811.77 $189,169.94 ENGINEERING,SURVEYING,AND SOIL TESTING(18%) S103,669.18 $270,887.30 S374,556.48 TOTAL COSTS $679,609.07 $1,775,816.76 $2,455,425.83 THIS DOCUMtNT IS ISSUED FOR INTERIM REVIEW AND IS NOT TO BE USED FOR CONSTRUCTION, BIDDING, OR PERMMING PURPOSES. GARY W.MENSIK,P.E. TEXAS P.E.i184738 /0//ill L ) 0+ 1 d F I sV— ^/ 'Es 6 W:t and\I994\RevisedCostEstimatesaivmstane Ranch COP San Cost 101512.th Exhibit A PRELIMINARY PROBABLE ESTIMATE FOR: TO SERVE RIVERSTONE RANCH AT CLEAR CREEK SEGMENT A SANITARY SEWER COST PRORATION INCLUDING CITY OF PEARLANI) CITY O0 PEARLAND October 154012 HARMS COUNTY MUD NO.MO SEGMEN'I'A WII'H THE Cl'I'Y OF PEAKLANI) SEGMENT A WI'I'HOU'I'Cl'I'Y (if PEAKLANI) SEGMENT A-1 SEGMENT A-1 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST ITEM DESCRIPTION UNIT 0TY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM I.8'PVC Sewer Pipe(16'-IX'Depth) LF 80.0 528.1D 82.240310 I.N.PVC Sewn Pipe(14'-16'Dept) LF 120.0 $24.00 $2.1010.00 2.Tr PVC Sewer Pipe(19'-20'(kpth) If 610.0 $32.00 S19520.00 2.8"PVC Sewer Pipe((6'-III'Depth) IF 570.0 $21.00 $15,960.00 3.Standard Sanitary Scwcr Manhole EA 4.0 $2,30000 $9,200.110 3.Standard Sanitary Sewer Manhole EA 4.0 $2.300.00 89.200.20 4.Extra Depth for Sanitary Manhole Over 8') VF 43.0 $235.00 510.105.00 4.Extra Depth for Sanitary Manhole(Oyer 87 VF 34.0 8235.00 $7.990.00 5.Standard Drop on Manhok EA 1.0 $350.00 $350.00 5.Standard Drop on Manhole EA 1.0 $350.00 8350.00 6.Extra Depth for Drop VF 1.0 525.00 825.00 6.Extra Depth for Drop VF 1.0 825.00 825.00 7.Trench Safely System IF 690.0 $1.00 5690.00 7.Tench Safety System LF 690.0 51.00 $690.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $42,130.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $37,40510 MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS I.Dewatering LF 690 S22.00 $15.180.00 I.Dewatenng if 690 $22.00 $15,180.00 2 Sanitary Sewer Wet Send Construction(Deeper than 127 LF 690 $15.00 S10,350.00 2.Sanitary Sewer Wet Sand Construction(Defier than 121 LF 690 $15.00 S10350.01 3 Coy of Pnrland Inspection Fee for I%ofCtwnuuction COOS LS 1 $676.60 S676.60 3.City of Pearland Inspection Fee for(%of Construction Costs LS 1 $626.25 3626.25 SUBTOTAL MISCELLANEOUS ITEMS $26,206.60 SUBTOTAL MISCELLANEOUS ITEMS $26,15615 Subtotal Segment A-I $60,336.60 Subtotal Segment A-1 $63,251.25 SEGMENT A-2 SEGMENT A-2 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST 1.8'PVC Sewer Pipe(16-11 Depth) LF 536.0 $28.00 815.01.8.00 I.8'PVC Sewer Pipe(8'-M.Depth) if 536.0 $19.00 $10.184.00 2.8"PVC Sewer Pipe(14'-16'Depth) If 387.0 $24.(8) $9,288.01 2.8'PVC Sewer Pipe(0'-8'Depth) IF 387.0 $18.00 $6,966.00 3.Standard Santry Sewer Manhole EA 6.0 12,300.0) SI 3,8(0.00 3.Standard Sanitary Sewer Man0ok EA 6.0 $2300.00 $13,800.00 4.Extra Depth for Sanitary Manhole(Oran 8) VF 50.0 $235.00 $11.750.00 4.Extra Depth for Sanitary Manhole(Ova 81 VF 3.9 $235.00 $916.50 5.Stndrel Sanitary MN with$0016.d Drop for Man Line Sanitary Sewer EA 1.0 $350.00 $350.00 5.Standard Sanitary MU with Standard Drop for Main Line Sanitary Sewer EA 1.0 $350.00 $35000 6.Extra Depth for Drop VF 6.6 $25.0) $165.00 6.Extra Depth for D,np VF 3.6 $25.00 $90.00 Trends Safety System LF 923.0 $1.01 $923.00 7.Trench Safety System IF 923.0 $1.M S923.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM 851,2114.44 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM S33,229S0 MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS I.Dowarmng LF 923 822.00 520,306.00 I.Dewalcing IF 0 $22.00 $0.00 2.Sanitary Sower Wet Sand Commission(Deeper than 121 IF 923 SI5.0) 813,845.00 2.Sanitary Sown,W a Sand Constriction(Deepet than 12') IF 0 $15.00 10.0) 3.City of Penland Inspection Fee for 1%of Construction Costs LS 1 $854.35 $854.35 3.Coy of Pear6d Inapec0on Fee for 1%of Contraction Can LS I S332_10 0332.30 SUBTOTAL MISCELLANEOUS ITEMS $35,00535 SUBTOTAL MISCELLANEOUS ITEMS $332.30 Subtotal Segment A-2 $S6,213935 Subtotal Segment A-2 $33,561.08 2 o-F /0 W ALandl I994IRevleedC'o nEsdmnuVtiverstone Ranch COY Sao Cost 101512ah Exhibit A PRELIMINARY PROBABLE ESTIMATE FOR: TO SERVE RIVERSTONE RANCH AT CLEAR CREEK SEGMENT A SANITARY SEWER COST PRORATION INCLUDING CITY OF PEARLAND CRY Of PEARLAND October 15,2012 RARRIS COUNTY MUD NO.109 SEGMENT'A Wl'l'H'1'HE CI'l'Y OF PEAKLANI) SEGMENT A WI'l'HOU'I'CITY OF'PEARLAND SEGMENT A-3 SEGMENT A-3 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST REM DESCRIPTION UNIT QTY UNIT COST 'REAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM I.r PVC Sewer Pipe(12'-14'Depth) IF 607.0 122.00 113,354.00 I.r PVC Sewer Pipe(12'-14'Depth) LF 0.0 122.00 10.00 2.Standard Sanitary Sewer Maehok EA 3.0 $2301.00 16,900.00 2.Standard Sanitary Sewer Manhole EA 0.0 12,300.00 10.00 3.E:m Depth for Sanitary Manhole((her 4') VF 17.0 1235.00 13.995.00 3.Extra Depth for Santry Manhole(Over f) VF 0.0 1235.00 10.00 4.Standard Sanitary MII with Standard Drop for Mon Line Sanitary Sewer EA 0.0 13.50.00 10.00 4.Standard Sanitary MN with Standard Drop for Main Line Sanitary Sewer EA 0.0 1350.00 10.0) 5.Extra Depth for Drop VF 11.0 525.00 30.00 5.Extra Depth for Drop VF 0.0 125.00 10.00 6.Trench Safety System LF 607.0 $1.00 $607.00 6.Trench Safety System IF 0.0 11.00 93.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $24,856.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM 50.80 MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS I.Dewawioe LF 607 122.00 $17154.00 I.Dewaterin5 IF 0.0 122.00 $0.0) 2.Santry Sewer Wet Sand Cmwu don(Deem than 123 LF 607 $15.00 19,)03.0) 2.Sanitary Sewer Wet Sand Ctnatmetion(Deeper than 123 LF 0.0 115.00 10.0) 3.City of Penland Impaction Fee for l%of Conaronioo Coma LS I $473.15 $473.15 3.Cary of Penland Inspection Fee for I'b of Construction Cons LS I 10.00 50.00 SUBTOTAL MISCELLANEOUS ITEMS $22,532.15 SUBTOTAL MISCELLANEOUS ITEMS SO.00 Subtotal Segment A-3 $47,788.15 Subtotal Segment A-3 10.00 TOTAL SEGMENT A S2020114.10 TOTAL SEGMENT A $96.8 13.05 DIFFERENCE CITY OF PEARLAND $105.601.06 3 04. 1° 2 W:LLao.1\1994\RevisedCnatEoon oo,031vo Rawl.mane Ra COP San Cot lel512ds Exhibit A PRELIMINARY PROBABLE ESTIMATE FOR: TO SERVE RIVERSTONE RANCH AT CLEAR CREEK SEGMENT B SANITARY SEWER COST OVERSIZING INCLUDING CITY OF PEARLAND CITY OR PEARLAND Oe6a1e.15,2512 IIARRIS COUNTY MUD NO.515 SEGMENT B WITH THE CITY OF PEARLAND SEGMENT B WITHOUT THE CITY OF PEARLAND SEGMENT B-1 l SEGMENT B-11 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST ITEM DRSCRImON UNIT QTY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM 1. IC PVC Sexy P¢(PP-16'12p6) IF 1700 $3610 16461411) I.BY PVC Scx")'f(e(1)'-1ff D.ph) IF 11.0 126.0) MAW 2. S)aNrd Sailvy Serer Mashie EA 1.0 12200.161 S2.300.00 2.S)a11rd Sammy Sewer Muhie IA 0.0 12.300.1.1 WOO 3. him DAB for Selby ma.*(Ow X) VF 7.0 $235.011 11,613.00 3.Extra Depth fir Snits',Mont(Ova x') VF 0.0 1233.00 3000 a. Lt..Safely Systaa IF 170.11 $1.011 11711011 1.TreM.Safely Sweat IF 00 11.M1 10.0l SUBTOTAL SANITARY SEWER COLLECTION SYSTEM SIS,S75.1O SUBTOTAL SANITARY SEWER COLLECTION SYSTEM SRN MISCELLANEOUS ITEMS MISCF.I.IANEOUS ITEMS I. DP..).l IF 1711 $221111 13.741400 I.Iewa)aer1 LF 0 S2200 10.111 2. Srtry Sae Wei Seed Ca mnatioe(Deeper there 12') LF 170 113.01 12.351400 2 Salutary Scow Wel Sam Casiractan()1%3a10an 12'I IF 0 115.00 30.00 3. City ofPeaAsmhupetiao Fa ler 1h ofCarOeeowCans IS I $160.65 $1611.65 3.C'iy of)'earlani Inspection Fe fir ICI o)C,nceC,.C,at1 LS I 1010 t0.10 SUBTOTAL MISCELLANEOUS ITEMS %ARLO SUBTOTAL MISCELLANEOUS ITEMS 10.00 SUBTOTAL SEGMENT B•I I S17133.65 SUBTOTAL SEGMENT B-II SOAR SEGMENT B-10 SEGMENT B-10 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST ITEM ossour ION UNIT OTT UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM i. IY PVC Sere Pile(14'-16'Depth) LF 400.0 $34.10 $15.200.00 I.X'PVC Sex"Pipc 112-la Dg0h) LF 400.0 122.00 151100A0 2. Standard Sanitary Sewe Maande EA I.)) $231000 52310.10 2 Standard Sanitary Snow Manhole EA 1.0 S23010) 12300.0) 3. Extra Depth 6r Soapy Mackie(One X1 VF 7.0 $233.011 S1.60.03 1 Eaua Depth fa Saeitry Meanie(Over R7 VF 5.0 1235.00 11.175.0) 4 Trrst Sahry Systm LF 400.0 SEW 1400.00 4 Trench Obey System LF 4110.0 $1.10 11DMM) SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $111,545.1111 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $12,675.M MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS 1. Iewrmq IF 400 122.0) *mum I.Deratain/ LF 403 $22.00 IL620.1O 2. Sashay Sawa Wet Sand CI Takao(Daps than l 2'1 LF 400 115.(11 16.010.00 2.Sanitary Sewer Wd Sera Conavaira(Deeper then 12) IF 400 S15.00 160111.01 3. City 00 Ttarlll Impaction Fee fa I%of C01I11 4.n Cams LS 1 1343.45 S343.45 3.City of Harland ITOO5oa Fes for I0 of Car0odi.r Ct. LS 1 1274.75 1274.75 SUBTOTAL MISCELLANEOUS ITEMS 115,113.4S SUBTOTAL MISCELLANEOUS ITEMS $15,074.75 SUBTOTAL SEGMENT B-IS 04,1111.45 SUBTOTAL SEGMENT B-IS $27,745.75 SEGMENT B-9 SEGMENT B-9 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM 1. 12-PVC Seger Npe(1E-IS Depth) li 320.1) S42.111 113.44100 I.X-PVC Sewer Pipe(14'-10 Deph) 1F 32140 S24.01) S7.61010 2. %Weal Savvy Sewn Meanie EA 1)) 1230).0) 1230400 2.Sumrd Sanitary Saw Ma6Me FA 1.0 S2.300.05 F.300.110 3. Exm Depth fa Santry Mashie(One IT) VF RR S215110 1LMe401 3.Extra Deph I r Salary Menhir IOW 11 VF 6.0 S235.00 $1,410.01) 4. Teach Sahry Systaa IF 33140 SLID $3211.11) 4.Tram)Sally Swam IF 3200 SI110 S330.1e1 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $17,1411.011 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $11,710.111 MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS I. Derma-hp LF 320 S22.0) S7.040.00 I.lewrairy LF 320 122.00 $7.010.10 2. Seartry Sew"Wa Sam C raervcMe(Uape than 12'1 LF 320 115.U) 14.111I0.00 2 Sanitary Saver Wa Sam Comnaitn(Deeper Dan 12') IF 320 815.00 24.00.00 I CA)aPah..d Imps-en Fa,6r IN of Cnauuma)Ctau L5 1 1297.0) 1297.MI 3.City MlSa0am lsryavn Fa ra IS et Caruvcwl Cola LS I 1233.50 5233.50 SUBTOTAL MISCELLANEOUS ITEMS 312,137.50 SUBTOTAL MISCELLANEOUS ITEMS $12,075.55 SUBTOTAL SEGMENT B-S $30,071.91 SUBTOTAL SEGMENT B-11 #3,716l0 'h 4- 10 I WAvaMWW I9ctalCaREaaraVtivera a Rend.COP See Ctr 101512ae Exhibit A PRELIMINARY PROBABLE ESTIMATE FOR: TO SERVE RIVERSTONE RANCH AT CLEAR CREEK SEGMENT B SANITARY SEWER COST OVERSIZING INCLUDING CITY OF PEARLAND CTTY OF PEARLAND October 15,2012 HARMS COUNTY MUD NO.RN SEGMENT B WITH THE CITY OF PEARLAND SEGMENT B WITHOUT THE CITY OF PEARLAND SEGMENT B-8 SEGMENT B-8 ITEM DBSCRIPTIOM UNIT QTY UNIT COST TOTAL COST ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL.COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM 1. IT PVC Sawn PIPe116'-1a'91pi) LW 560E IMAM $21.280.00 I.10.PVC Sew.Moe()4'-IC moo LF 360.0 $26.11) $101M1.10) 2 IU PVC Sew,Plpe(16'-IE Mph) LF n100 132.10 16,600.00 2. SWnird Sanuary Sewn Mada6e EA 2.0 52.300.00 14.610.01 3.Sanford Sanitary Sewn Manhole EA 20 $2300.10 S6.E00.00 3 Enna IAptn fur Swim),MaMole(Ova S) VF 18.0 $235.01 64,23000 4.Earn Depth M Smeary 66186e IOwr 8) VF 15.0 1215.00 53525.01 4. Treat Safety eyeem LF 560.0 SIB) LS60.M 5.Meech Slimy Nyman LF 360.11 11.00 5360.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM 131,670.01 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM SUMIS.M MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS I. Domain LF 5N1 $22.00 512.32010 I.Dewatmnl IF 500 12200 112,32010 2. Sanitary Sewer WI Sad Cre'uraM6n(Deeper dm 12) IF 500 513.0) RL600.10 2.Sanitary Sew,Wm Sand Cmw0aiin(Deeper dun 121 IF 560 $15.011 $4.4011.00 3 City le Hadar Intmcfin Fee M l4 dGrmm5ia Cosa LS 1 6513.90 1513.90 3 City of Par6nd Inspection Fa for 14,1C1maaailn Cons LS 1 5456 85 6456.65 SUBTOTAL MISCELLANEOUS ITEMS $21,133.00 SUBTOTAL MISCELLANEOUS ITEMS $21,17615 SUBTOTAL SEGMENT B-S S51,503.* SUBTOTAL SEGMENT B-S $46,16IAS SEGMENT B-7 SEGMENT B-7 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM I. I r PVC Sewer Pipe(IP•IX'Depth) IF 265.0 $42.00 $11,110.0) I.TIT PVC Sew Pipe 116'-II Depth) LF 530.0 $32.00 $16.960110 2. 12-PVC Sena rya(IF-20 Depth) IF 265.0 $47.01 $12655.00 3. S1aWd Sammy Sawa Marne EA 20 S2.1111610 64.60.0) 2 Simard Sanitary Saar Manhole EA 2.0 11.300.10 11.60010 6. Erm 048E for Sanitary Mar ok(Ow 8') VF 19.0 $235.10 64,465.00 3.Extra Depth M Sarinry Marble(O9r in VF 17.0 1235.00 53.995111 5. Irma Sally Sync IF 265.0 11.11) 1265.00 a Trench Sally System IF 530A 11.00 $530.01 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM 132.9IS.M SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $26,OLSAI MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS I. [ewvi,, IF 530 612111 111.600.01 I.IJewalaing IF 530 622.(0 511.660.02 2. Santry Sawa Wet Sam Clmon.5im(Dr9a(Mn IT) LF 530 115.(O $7,950.00 2.Santry 4.m,WI Sand Clem tim(Orpr Mtn 121 IF 5311 615.00 67.95001 3. CI3 of Pendant'Ingnrim Fee M 14 of Corso-maim Cues LS 1 1525.25 1525.25 3.City 18)Sarhd Im9a0in Fee M 14 NClamwnin Cans LS 1 $456.95 5456.95 SUBTOTAL MISCELLANEOUS ITEMS $20,135.25 SUBTOTAL MISCELLANEOUS ITEMS $20,1/6.95 SUBTOTAL SEGMENT B-7 153,050.25 SUBTOTAL SEGMENT 0-7 $46,ISL9S SEGMENT B-6 SEGMENT B-6 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM 1. Ir PVC Sam Pipe(IS-20 Depth) LF 7110.0 647.01 5329(1001 I.12'PVC Sawa Plm(16'-?If Depth) LF woo 547.00 532.90).00 2. S0r.Md Sa0ury Sewer Ma16e*e EA 211 62,310.10 64A(0.(11 2 Standard Santry Sewer MaII Oe EA 20 1230..01 64fi00.00 3. Faan Mph M Sanry Malhde(Other) VF 21.0 6235.00 15.610.(11) 3.Extra Depth for Sanitary Manhole(Ova S) VF 21.0 1235.06 $4.935.00 4. Trench Saby Syia LF 710.11 11.10 170010 4.Trend Salary.9rym LF 700.0 $1.0) STOW SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $43,615.11 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $43,135.10 MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS I. Dewrang LF 70) 122.0) 115.40.00 I.Urwnai% IF 70) 61200 115.40000 1. Sanitary Saw Wet Sand Clmamai n(Deeper Om IT) LF MO $15.00 SIO son.01 2.Sanitary S1.m,Wa Sand Clarraco n(Deeper M ei I21 1F TU 615.00 110400.00 3. C1ry dPmrlaed Its tics Fee M III of Communion Cur LS I 1695.0.5 1695.05 3.City I ParlaM Impaction Fee M I4 of CaanraainClwn IS 1 $690.35 OA0.35 SUBTOTAL MISCELLANEOUS ITEMS $2458S1S SUBTOTAL MISCELLANEOUS ITEMS 126,S5.35 SUBTOTAL SEGMENT B-6 $71,200.05 SUBTOTAL SEGMENT B-6 $61,725_75 So4./0 2 W:LL11M960)190.60d.lsEIlirm milesgi, t on Rant COP San C1q 1013121E Exhibit A PRELIMINARY PROBABLE ESTIMATE FOR: TO SERVE RIVERSTONE RANCH AT CLEAR CREEK SEGMENT B SANITARY SEWER COST OVERSIZING INCLUDING CITY OF PEARLAND CITY OP PEARLAND October 15,2012 NARRIS COUNTY MUD NO.MS SEGMENT B WITH THE CITY OF PEARLAND - SEGMENT B WITHOUT THE CITY OF PEARLAND SEGMENT B-S SEGMENT B-5 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL CAST ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM I. IS'PVC Sew Pipe(2O-22.1400 IF 430.0 15(1.(1I S21 1W.I0 I.12'I'VC Sew Pipe I IT-2)7 Depth) LF 430.0 M7.0) S20210.00 2. Uasdrd Sanitary Sera Manhole EA 211 52.3112O1 14.600.00 2 Standard Santry Sera Manhole EA 20 S2.300.O1 M.61.111.0) 1. Kura Depth 6r Sanitary Manhole(Orr El VF 26.0 S235.00 16.110.00 3.Extra Depth to Sanitary Manhole(Ow P3 VF 23.0 S235.011 M,4U5.0) 4. Trent!Safety Syreta IF 130.0 $1.0) S430.00 4.Trends Safety System LF 430.0 51.011 S43ILO) SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $32,640.00 SUBTOTAL SANITARY SEWER COUY.CI ION SYSTEM $30,6 5.00 MISCEI.IANEOUS ITEMS MISCELLANEOUS ITEMS I. 0coNDI u IF 430 122.00 19,461.11) I.Decatairy (F 430 S22.3O 59.410.00 2. Santry Sew.Wet Sard Clamp 05m(Deeper than(21 IF 430 11300 S6,450.10 2.Ramey Sew Wet Sand gaonlctila(Deeper than 121 IF 430 S15.O1 M,A50.00 3. City ofP20S dlmp tim Fee Sy IW ofC,roKtian Costa IS 1 SW5.50 S4115.511 3.City Pearls 3In320100 Fa!I%of CamU WsCm Li 1 1465.55 S465.55 SUBTOTAL MISCELLANEOUS ITEMS $16,355.50 SUBTOTAL MISCELLANEOUS ITEMS $14,375.55 SUBTOTAL SEGMENT B-S $44.035.50 SUBTOTAL SEGMENT B-S O41,020.55 SEGMENT B-4 SEGMENT B-4 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST ITEM DESCRIPTION IM1T QTY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM 1. )6"PVC Sew Pipe(2V-27lepth) IF 6000 $72.10 543.200.O1 I.12.PVC Sorer Pipe(21r.22'Depth) IF SS0.0 S5200 S44.200.00 2. 16'PVC Sew Pipe(22-24'Depth) IF 650.0 576.00 149M0.1O 2.I7"PVC St. Pipe l22'-24'DeNh) IF 401.0 556.01 822A01/01 3. Mandr6 Sa nary Sew Manhk EA 4.0 12NRO1 3911O00 3.Slamrd Sanitary Sewer Manhole EA 4.0 52.301.01 S9.ID0.00 4. Extra Depth for Sammy Ma hie((Tc A') VF 560 S235.0) S13.160.01) 4.Eaoa(kph fa Sanitary Mashie 6Oa.111 VF 520 S235.00 S122fi.m 5. TreatSalOY System IF 60.0 11.0) 1600.00 S.Trench Sally Sy0m, IF 450.0 S1.00 S450.01 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $115,560.11 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM MBINI.M MIS(ESAANEOUS ITEMS MISCEELANP.OUS ITEMS I. Ina tawg IF 1250 S77.00 527101.00 I.R+Maing BF 1250 S2200 827100.00 2 S&Mry Sew We SamGorinnxti,nf Deeper Nan IT) IF 1250 S15.00 S111,730.011 2.Sanitary Sew Wet Sam C,lha(taps than l T) IF 1250 11500 S14,75000 3. City of Parked Impation he fur 19.ofC,MUNN Cots LS I S1.6111.11 $1,611.10 3.City of 1Mam Inspashn Fe 6r IT.of Cmrrunea C,ra, IS 1 $1,331.20 11331.20 SUBTOTAL MISCELLANEOUS ITEMS $47,Bi8.10 SUBTOTAL MISCELLANEOUS ITEMS $47,601.20 SUBTOTAL SEGMENT B-4 S163,42014 SUBTOTAL SEGMENT B-I 8136,471.20 SEGMENT B-3 SEGMENT B-3 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM I. 16"PVC Sew Pipe(2T•24 1191$) IF 3220 176.01 S24.472011 I.I6"PVC Sew Pipe(2-24.Depth) IF 3220 S76.01 524,47206 2. Standard Sanitary Sean Manhole EA 1.)) 112300.O1 52101.110 2 Mandan;Santary Sewer Manhole EA 10 12.I00.00 12.101.00 3. F Depth fur Sanitary Maeh4e 1fTs.Al VF 16.0 5235.O1 S3,760.0 0 3.EoOl Myth for Saitry MM6Y5(Orr S) VF 16.0 1235.00 $3,760.1O ♦. Trmce Safety Spann LF 3220 SLOT 5322O1 4.Tresdn Safety System IF 3220 31.00 S322.10 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM 530.0.54.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $3010.54.00 IBbWNROUN ITEMS MISCELLANEOUS TrEMS I. Dem rlrt LF 322 12201 SI4P4.011 I.IX K IF 322 12210 t7A44.00 2 Santry Sew Wet Sam Gauruao(D,apa Sac l71 IF 322 SIS.tn NJ30.00 2.Sanitary Sera Wei Sal CoaaouaIn(Deap.thud?) IF 322 S15.00 M.SYL(D 3. CID oPrtdamlmpnalm Fee 6r 1%4CmUutli,r Cana LS I S427.611 5427.6E 3.City of Halms'ha9n.Pn Hie fur 1'F t6Cswt 1Nn CnD LS I 5427.6E 1427.6E SUBTOTAL MISCELLANEOUS ITEMS $12,341.111 SUBTOTAL MISCELLANEOUS ITEMS 312,341.60 SUBTOTAL SEGMENT B•3 $43,95.01 SUBTOTAL SEGMENT B-3 $43,195.65 6o-ftIU 3 W tarNlpMs R,a00L',ntt Munster(i arsaae Ranch CI W San Cos 1015124b Exhibit A PRELIMINARY PROBABLE ESTIMATE FOR: TO SERVE RIVERSTONE RANCH AT CLEAR CREEK SEGMENT B SANITARY SEWER COST OVERSIZING INCLUDING CITY OF PEARLAND CITY OF PEARLAND Od.6m IS,2012 HARRIS COUNTY MUD NO.M9 SEGMENT B WITH THE CITY OF PEARLAND SEGMENT B WITHOUT THE CITY OF PEARLAND SEGMENT B-2 SEGMENT B-2 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COTT ITEM DHSCW POOH UNIT QTY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM 1. M.PVC San Pipe(22-N'Depth) lF 3950 176.00 S30.020.00 I.IT PVC Sew Pan(2r-24'D*00 lF 395.0 176.00 130.03100 2 16'PVC Sewer Rpe(20-26'Depth/ IF I30.0 110.00 110.101.00 2.I6-PVC Sewer Pipe(24-26.Depth) IF 130.0 180.03 $10.110.00 3. Standard Maury Saw Manhole EA 3.0 12.303.115 S6.901.00 3.Staadatd Sanitary Sewer Mar at EA 3.0 1230000 SERUM ♦. Extra Depth for Sanitary Mash*(Over E) VF 520 $235.13) S12220.00 4.Eatn Dgth Er Santry Manhle(0.4aT VP 520 S23500 $12.231.IX1 5. Trench Safety System IF 525.0 S1.00 S525.00 5.Tea*Safety SYBaan IF 525.0 SITB S525.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM 560,00S.M SUBTOTAL SANITARY SEWER COW{CIION SYSTEM $60,066.00 MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS I. DnnreR LE 525 32200 111.55121D I•Dewateitg IF 525 S2200 SII.550.1) 2 Sanitary Scar Wu Sand Construction(teem Dun Y) IF 525 S15.00 17.175.0) 2.Sentry Saner Wei SUN Construct*.(Deeps than(2') IF 523 SI3.I10 17.175.10 3. City of Newland Inspection Fee fur 14 m9 Comm.-eon Cana. IS I S794.90 S794.90 3 City of Fernand Duren*Fs Sr IV 14 Cas:make Cams LS I S794.90 1794.90 SUBTOTAL MISCELLANEOUS TIEMS $2,219JB SUBTOTAL MISCELLANEOUS ITEMS 52C219.90 SUBTOTAL SEGMENT B-2 SM,2M.90 SUBTOTAL SEGMENT B-2 SM3111.911 SEGMENT B-1 SEGMENT B-1 ITEM DFSCIUPf1ON UNIT QTY UNIT COST TOTAL COST ITEM DESCRIPTION UNIT QTV (NIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM 1. (6"PVC Sew Pape(24'-26 Depth) IF 249.1) 110.110 S19.920.00 I.IF PVC Sesta Pipe(24'•26'Depth) IF 249.0 SW 00 519.931.0) 2. Soadar4 Sanitary Sews Manhole EA 20 f2311).00 S4600.111 2.Standard Sanhry Sewer MantaA: EA 20 $2300.0(1 M.600.00 3. Ear.Dee*6r Maury Maah4c 11ha U) VF 34.0 S135.00 S7.990.00 3.E33.Depth fa Santry Manhole I(Aer 1') VF M.11 1235.00 S7.990.00 4. Tradl Safety System IF 249.0 11.D1 S749.00 4 TEA Safety Sy** IF 249.0 $1.00 1249.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $32,759.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $32,759.00 MISCELLANFAIB MOO MISCEI.LANSdb ITEMS 1. Dereaaatn9 IF 249 12210 S5.476.00 I.Dm**, IF 249 12200 15.476.00 2. Sadary Mew Ma Salad Cafmtmlm(Own,Om 12') LE 249 115 W 13.73510 2.Sanitary Saws Wu Swat Cumnrctta(Beep*than IT) IF 249 S15.00 13.733.1D .p 3 Coy of rbs mb Fs for Cmm laep IS asioa Cram I\ I 3419.72 S419.72 3.City Ill(Sauna Wyse**Fee for19'ofC<tetrwetIa Cum LS I M)9.72 M19.72 SUBTOTAL MISCELLANEOUS ITEMS 56032.72 SUBTOTAL MISCELLANEOUS ITEMS 59,62.72 SUBTOTAL SEGMENT B-I $42,391.72 SUBTOTAL SEGMENT B-1 $42,391.72 TOTAL SEGMENT B $635.290.00 TOTAL SEGMENT B S562911145 DIFFERENCE CITY OF PEARLAND $72,37155 7 6-110 WALAN11199402evisedCanTstinimeNtiverinas Ranch COP Sm Cam 101512.W Exhibit A PRELIMINARY PROBABLE ESTIMATE FOR: TO SERVE RIVERSTONE RANCH AT CLEAR CREEK SEGMENT C SANITARY SEWER OVERSIZING INCLUDING CITY OF PEARLAND CITY OF!HARLAND October 1S,2012 HARRIS COUNTY MUD N0.S89 SEGMENT C with City SEGMENT C without City SEGMENT C-1 SEGMENT C-1 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM I. 12'PVC Sewer Pipe(22'-24'Depth) LF 661.0 S56.00 S37,016.00 I. 8'PVC Sewer Pipe(10'-12'Depth) LF 350.0 S20.00 S7A00.00 2. Standard Sanitary Sewer Manhole EA 3.0 52.300.(0 16.900.00 2. 8"PVC Sewer Pipe(12'-14'Depth) IF 311.0 S22.00 54342.00 3. Exrs Depth far Sanitary Manhole(Ow:F) VF 46.0 S235.00 S10.810.00 3. Mandan(Sanitary Sewer Manhole EA 3.0 82,300.00 S6,900.00 4. Smtdrd Sanitary ME with Standard Drop for Main Line EA 1.0 S350.00 S350.00 4. Extra Depth for Sanitary M.nhok(Owe 16) VF 10.5 S235.00 S2,46730 Stymy Sewer 5. Extra Depth for Drop VF 15.0 325,00 $375.00 5. Standard Sanitary ME with Swnhtrd Drop for Main Line EA 0.0 3350.00 30.00 Sanitary Sewer 6. Trench Safety System IF 661.0 31.(10 S661.00 6. Exua Depth for Drop VF 0.0 325.00 S0.00 7. Trench Safety Syucm IF 350.0 $1.00 1350.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $56,112.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM S23,55936 MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS 1. Dewarering LF 661 122.I/0 S14.542.00 I, Dewrerfng IF 311 S22.00 S6.842.00 2. Sanitary Sewrr Wet Sand Comwctwe(f3aper than 12) I.F 661 S1330 39,915.00 2. Sanitary Sewer Wet Sand Construction(Deeper than 121 LF 311 $15.0() $4,665.00 3. City of)bland Inspection Fee fur 1%of Construction Goa LS 1 S805.69 $E05.69 3. City of Pearland Inspection Fee for 1%of Colwmletion Cons LS 1 S350.67 S350.67 SUBTOTAL MISCELLANEOUS ITEMS $25,262.69 SUBTOTAL MISCELLANEOUS ITEMS 811,857.67 SUBTOTAL SEGMENT C-I $81,374.69 SUBTOTAL SEGMENT C-I $35,417.17 SEGMENT C-2 SEGMENT C-2 ITEM DESCRIPTION UNIT OTT UNIT COST TOTAL COST ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM I. 12'PVC Sew,.Pipe(20-22'Depth) IF 126.0 352.00 S6352.00 1. R"PVC Sewer Pipe(8'-10 Depth) LP 200.0 $19.00 33.80000 2. 12'PVC Sewer Pipe(22-24'Depth) LF 4520 S56.00 S25 31200 2. R'PVC Sewer Pipe(1a-12'Depth) LF 252.0 520.00 S5.010.00 3. Standard Sanitary Sewer Manhole EA 3.0 32.300.00 S6,9001.W 3. Standard Sanitary Sewer Manhole EA 2.0 51,300.00 S4,600.00 4. Extra Depth for Sanitary Manhok(Ux,.11') VF 420 3235.00 $9,170.00 4. Extra Depth for Sanitary Manhole((Ter 8) VF 33 3235.00 S822.50 5. Standard Sanitary MS with Standard Drop for Main Line EA 0.0 S350.0() S0.00 5. Standard Sanitary ME with Standard Drop for Main Line EA 0.0 S350.00 S0.00 Saotary Sewer Sanitary Sewer 6. Pow.Dp.for Drop VF 0.0 S25A0 S0.00 6. Extra Depth for Drop VF 0.0 S25.00 S0.00 7. Trench Safety System LF 578.0 I1.00 S571.00 7. Trench Safety System LE 200.0 S1.00 S200.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM S49,212.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $14,462.50 MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS 1. Dewatenng 1F 571 S22.00 1)2,716.00 1. Iewarering IF 0 $22.0) WOO 2. Sanitary Sewer Wet Sand Construction(Deeper than 12') LF 578 $15.00 $5.670.00 2. Sanitary Sewer Wet Sand Conatrucvrm(Deeper than 12) LF 0 S15.00 30.00 3. City of Perlaod Inspection Fee for 1%of Construction Coast LS I 3703,9E 5705.9)) 3. City of Pr rlo d Inspection Fee Der I%of Constructim Costa LS 1 S144.63 S144b3 SUBTOTAL MISCELLANEOUS ITEMS $22,091.98 SUBTOTAL MISCELLANEOUS ITEMS $144.63 SUBTOTAL SEGMENT C-2 571,303.9E SUBTOTAL SEGMENT C-2 $14,607.13 0f /0 I W LL.mdd994UtevisedCost& a)R timateivawS.ore Ranch COP Co..10151291s Exhibit A PRELIMINARY PROBABLE ESTIMATE FOR: TO SERVE RIVERSTONE RANCH AT CLEAR CREEK SEGMENT C SANITARY SEWER OVERSIZING INCLUDING CITY OF PEARLAND CM(OF PEARLAND October 15,2812 HARRIS COUNTY MUD NO.SST SEGMENT C with City SEGMENT C without City SEGMENT C-3 SEGMENT C-3 ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTLII SANITARY SEWER COLLECTION SYSTEM I. 12"PVC Sewer Pipe(20-22'Depth) IF 754.0 152.00 $39.200.01 I. 8"PVC Sewer Pipe)8'-Ify Depth) LF 150.0 119.00 12,850.00 2. 8"PVC Sewer Pipe(10'•I2'Depth) IF 604.0 520.00 112.000.01 2. Standard Sanitary Sewer Manbok EA 2.0 $2,300.00 14.603.00 3. Standard Sanitary Sewer Manhok EA 2.0 $2.300.00 $4.600.00 3. Extra Depth for Sanitary M.nhok(Ova 8) VF 25.0 $235.10) $5,875.00 4. Extra Depth for Sanitary Maohok(Over 8) VF 7.9 $235.00 $1.856.50 4. Standard Santry MII with Standard Drop for Main line EA 1.0 $350.00 $350.00 5. Standard Sanitary MH with Statd'ud Drop for Main Lire EA 0.0 S350.00 $0.00 Santry Sewer Santry Sewer 5. bat.Depth for Drop VF 4.8 S25.00 5120.00 6. ExIm Depth 6x Drop VF OA 125.00 10.00 6. Trench Safety System IF 754.0 $1.00 1754.00 7. Trench Safety System LF 754.0 $1.00 1754.0) SUBTOTAL SANITARY SEWER COLLECTION SYSTEM SS0,907.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM S22,14030 MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS I. Dewaiaing IF 754 $22.00 $16,588.00 I. I)ewrning IF 0 122.0) $0.00 2. Sanitary Sewer Wet Sand Conurectian(Deeper than 12') IF 754 $15.00 $11.310.00 2. Sanitary Sewer Wet Sand Conatrtcrion(Deeper than 121 IF 0 $15.00 $0.00 3. City of l earland Inspects.For for I9.of Construction Coats LS 1 $7811.05 $781.05 3. City of Pearland Inspection Fee for I%of Crr0t 0tioo Coats LS 1 $221.41 $221.41 SUBTOTAL MISCELLANEOUS ITEMS $28,686.05 SUBTOTAL MISCELLANEOUS ITEMS 8221A1 SUBTOTAL SEGMENT C-3 $79,593.05 SUBTOTAL SEGMENT C-3 S22a8131 SEGMENT C-4 SEGMENT C-4 REM DESCRIPTION UNIT QTY UNIT COST TOTAL COST ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST SANITARY SEWER COLLECTION SYSTEM SANITARY SEWER COLLECTION SYSTEM I. 12-PVC Sewer Pipe(l8'-20 Depth) LF 174.0 $47.00 18,171.00 I. 8"PVC Sewer Pipe(IF-12'Depth) IF 0.0 $20.00 $0.00 2. Standard S.nitary Sewer Manhole EA 2.0 52,300.01 $8.600.00 2. Standard Sanitary Sewer Manhole EA 0.0 12,300.00 10.00 3. Exna Depth for Sanitary Mruho)e(Ova 8') VF 24.0 $235.00 15,640.00 3. Eatn Depth for Sanitary Manhole(fyw e) VF 00 5235.00 10.01 4. Standard Sanitary MN with Standard Drop for Maio line EA 1.0 $350.00 $350.00 4. Standard Snowy MH with Standard Drop for Main Line EA 0.0 1350.00 10.00 Sanitary.Sewer Sanitary Sewer 5. Extra Depth for Drop VF 3.2 $25.00 $80.0) 5. Exra Depth for Drop VP 0.0 $25.00 $0.0) 6. Trench Safety System IF 174.0 S1.011 $174.00 6. Trench Safety Sysem IF 0.0 $1.00 S0.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM $19,02.2.00 SUBTOTAL SANITARY SEWER COLLECTION SYSTEM SRN MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS I. Devermng IF 201 $22.00 $4,422.00 I. Dewrerng IF 0 $2200 $0.00 2. Sanitary Sewer Wei Sand Coatmcdon(000per than 12) LF 201 $15.00 $3,015.00 2. Sanitary Sewer Wet Sand Construction(Deeper than 12') LF 0 $15.00 $0.00 3. City of Forbad Inspection Fee far l%ofCo.retruction Co. LS I 1264.59 $26459 3. City ofPear)ud Inspection Fee for 1%of Construction Coen LS 1 10.00 10.00 SUBTOTAL MISCELLANEOUS ITEMS 82,20139 SUBTOTAL MISCELLANEOUS ITEMS S8.00 SUBTOTAL SEGMENT C-4 $26,72359 SUBTOTAL SEGMENT CJ $0.00 TOTAL SEGMENT C WITH CITY OF PEARLAND $258,995.31 TOTAL SEGMENT C WITOUT CITY OF PEARLAND $72,386.20 DIFFERENCE CITY OF PEARLAND $186,609.12 2 W 3I,an4d9941.R.inedCoOEswas b Utireraoe Ranch COP San Cat 101512.da Exhibit A PRELIMINARY PROBABLE ESTIMATE FOR: TO SERVE RIVERSTONE RANCH AT CLEAR CREEK REGIONAL LIFT STATION INCLUDING CITY OF PEARLAND CITY OF PEARLAND JOB NO.2040-5150 HARRIS COUNTY MUD NO.509 DATE: October 15,2012 ITEM UNIT QUANTITY UNIT PRICE TOTAL REGIONAL LIFT STATION(to serve approx 2,000 esfc) SITE WORK LS 1 $25,800.00 $25,800 40 HP PUMPS EA 2 $24,500.00 $49,000 VALVES,FITTINGS&PIPE(10') LS 1 $50,000.00 $50,000 STRUCTURAL(10'wet well) LS 1 $245,000.00 $245,000 ELECTRICAL LS 1 $65,000.00 $65,000 DEWATERING&MISC. LS 1 $20,000.00 $20,000 FENCE LF 240 $65.00 $15,600 CONCRETE SITE PAVING SY 200 $55.00 $11,000 LIFT STATION SUB-TOTAL $481,400 8'Forcemain LF 4400 $22.00 $96,800 Phase 2(650 Conn.)-Tie into Headworks LS 1 $80,000.00 $80,000 Phase 3-Second 8'Forcemain LF 4400 $22.00 $96,800 Phase 4- Third Pump LS 1 $40,000.00 $40,000 Total $795,000 • Since the ENGINEER has no control over the cost of labor,materials,or equipment,or over the contractor(s)methods of determining prices,or over competitive bidding or market conditions,his opinions of probable Project cost or Construction Cost provided for herein are to be made on the basis of his experience and qualifications and represents his best judgment as a design professional familiar with the construction industry,but ENGINEER cannot and does not guarantee that proposals,bids or the Construction Cost will not vary from opinions of probable cost prepared by him. REVISED 9/28/2012 Jo of /o Exhibit "B" Improvement Schedule Line Segment Subdivision Section Estimated Construction Start Date B-1 1 4th Quarter 2013 B-2 1 4th Quarter 2013 C-1 1 4th Quarter 2013 C-2 1 4th Quarter 2013 C-3 2 4th Quarter 2014 C-4 2 4th Quarter 2014 A-1 2 4th Quarter 2014 A-2 3 4th Quarter 2015 A-3 3 4th Quarter 2015 B-3 TBD TBD B-4 TBD TBD B-5 TBD TBD B-6 TBD TBD B-7 TBD TBD B-8 TBD TBD B-9 TBD TBD B-10 TBD TBD B-11 TBD TBD Lift Station& Force Main Phase Construction Schedule Completion Lift Station-Wet well,controls,&two pumps 1 Initial Construction First 8" Force Main 1 Initial Construction Tie 12" Force Main to Plant Headworks 2 Before 650 Connections Add Second 8" Force Main 3 Before 1,000 Connections Add Third Pump 4 Before 1,550 Connections