R-2012-156-2012-11-12 RESOLUTION NO. R2012-156
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, AWARDING A BID FOR STREET AND SIDEWALK
MAINTENANCE SERVICES.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That the City previously opened bids for street and sidewalk
maintenance services, and such bids were reviewed and tabulated.
Section 2. That the City Council hereby awards the bid to Brooks Concrete Inc.,
in the unit cost amounts reflected on Exhibit "A" attached hereto.
Section 3. The City Manager or his designee is hereby authorized to execute a
contract for street and sidewalk maintenance services.
PASSED, APPROVED and ADOPTED this the 12th day of November, A.D., 2012.
•(i)-- rJ
TOM REID
MAYOR
ATTEST:
•
Y NG M A .
Y SE ETARY :�,
APPROVED AS TO FORM:
DARRIN M. COKER
CITY ATTORNEY
Resolution No. R2012.156
Exhibit "A"
Brooks Concrete-Price Increase Schedule for First Renewal of Bid#0811-41
Expiring Contract Proposed Renewal Percentage
Work Item Description Price Price Increase
Required Performance Bonds and Insurance $6,800.00 $6,885.00 1.3%
Filter Fabric Fence, Maintain, Removal, Complete-
in-Place $2.00 $2.02 1.0%
Inlet Protection, All Types, Maintain, Removal,
Complete-in-Place $1.00 $1.01 1.0%
Tree & Plant Protection Fencing, Maintain,
Removal, Complete-in-Place $1.00 $1.01 1.0%
Tree Root Barrier, Complete-in-Place, per Detail $5.75 $5.82 1.3%
Trench Safety System (0'-10' Depth), Complete-
in-Place $25.00 $25.31 1.3%
Site Preparation, Clearing& Grubbing, Complete-in,
Place $4.00 $4.05 1.3%
Remove and Dispose of Existing Concrete
Pavement (up to 8" in depth). Price to include
required sawcutting of existing pavement,
Complete-in-Place $9.00 $9.11 1.3%
Remove and Dispose of Existing Asphalt Pavement
and Base,All Depths. Price to include required
sawcutting of existing pavement, Complete-in-
Place $9.00 $9.11 1.3%
Remove and Dispose of Concrete Curb,All Depths
and Types, Complete-in-Place $1.25 $1.26 .8%
Remove and Dispose of Concrete Sidewalk,All
Widths and Depths. Price to include required
sawcutting of existing pavement, Complete-in-
Place $6.75 $6.83 1.2%
Remove and Dispose of all Concrete or Gravel,
Asphalt Driveways,All Depths, Includes Sawcutting $6.75 $6.83 1.2%
Remove and Dispose of Existing Pipe Culverts and
Storm Sewer(18" and smaller in size), Includes
Backfill and Trench $8.00 $8.10 1.3%
Remove and Dispose of Existing Pipe Culverts and
Storm Sewer(greater than 18" diameter and less
than 36" diameter in size), Including Backfill of
Trench $10.00 $10.12 1.2%
Remove and Dispose of Existing Pipe Culverts and
Storm Sewer(36" diameter and larger in size),
Including Backfill of Trench $15.00 $15.18 1.2%
Hydrated Lime Slurry for Stabilized Subgrade,
Complete-in-Place $300.00 $303.75 1.3%
Expiring Contract Proposed Renewal Percentage
Work Item Description Price Price Increase
Install 8"Thick Hydrated Lime Slurry Stabilized
Subgrade, Compacted to 95%, Includes Excavation,
Complete-in-Place $4.50 $4.55 1.2%
Precast Storm Manhole 8'-0" Depth, Complete-in-
Place $3,600.00 $3,645.00 1.3%
Precast Storm Manhole,Additional Depth,
Complete-in-Place $275.00 $278.43 1.3%
4"Yellow White Pavement Markings, Complete-in-
Place $1.75 $1.77 1.2%
Replace Storm, Manhole Ring and Cover, Adjust to
Grade, Complete-in-Place $575.00 $582.18 1.3%
18" HDPE Storm Sewer, All Depths, Complete-in-
Place $35.00 $35.43 1.3%
24" HDPE Storm Sewer, All Depths, Complete-in-
Place $40.00 $40.50 1.3%
36" HDPE Storm Sewer, All Depths, Complete-in-
Place $45.00 $45.56 1.3%
Storm Curb Inlets, All Types, Remove and Replace,
Complete-in-Place $700.00 $708.75 1.3%
Adjust Manholes, All Types,To Grade, Complete-in-
Place $200.00 $202.50 1.3%
Adjust Inlets, All Types, To Grade, Complete-in-
Place $200.00 $202.50 1.3%
Adjust Valve Boxes, Meter Boxes, Electrical Boxes,
To Grade, Complete-in-Place $1.00 $1.01 1.0%
Asphaltic Concrete Surface Course for All
Pavement, All Depths, Complete-in-Place $20.00 $20.25 1.3%
Base Course for All Pavement, All Depths, Includes
Excavation, Complete-in-Place $14.00 $14.17 1.3%
Replace 8" Concrete Pavement, Complete-in-Place $48.78 $49.38 1.3%
Replace 6" Concrete Driveways with Subgrade,
Complete-in-Place $40.68 $41.18 1.3%
4" Reinforced Concrete Sidewalk, with #3 Rebar,
Including Excavation and Subgrade, Complete-in-
Place $35.28 $35.72 1.3%
Curb Ramp, with #3 Rebar, Including Detectable
Warning Surface, Complete-in-Place $450.00 $455.62 1.3%
Concrete Curb (0" to 8" Height), Complete-in-Place $5.20 $5.26 1.2%
Topsoil, Complete-in-Place $20.00 $20.25 1.3%
Hydromulch Seeding, Complete-in-Place $1,500.00 $1,518.75 1.3%
Expiring Contract Proposed Renewal Percentage
Work Item Description Price Price Increase
Sodding, Bermuda or Augustine, as Required,
Complete-in-Place $6.75 $6.83 1.2%
Extra 5,000 PSI Reinforced Concrete, Where
Required and Pre-Approved by the City, Complete-
in-Place $150.00 $151.87 1.3%