R-2012-134-2012-09-24 RESOLUTION NO. R2012-134 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING AND ADOPTING THE FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM (CIP) 2013-2017. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City Council hereby adopts the Five-Year Capital Improvements Program (CIP) 2013-2017 attached hereto as Exhibit "A". PASSED, APPROVED, AND ADOPTED this 24th day of September, A.D., 2012. TOM REID MAYOR ATTEST: 4F4'43.,,, "% Vi '.€ ' ' 1 NG RNJ ` ' 1�; /\ TY 5 RETARY �blltullaM`V APPROVED AS TO FORM: c if a__.-------- NGHIEM DOAN DEPUTY CITY ATTORNEY Exhibit "A" Resolution No. R2012-134 City of Pearland rE44. L X A_ S 2013 — 2017 5-Year Capital Improvement Program CITY OF PEARLAND 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM (CIP) TABLE OF CONTENTS PAGE INTRODUCTION i-v SUMMARIES Total Summary.. •••1 FY 2013 CIP by Funding Source 2-7 Project Detail Page Location 8-11 DRAINAGE PROJECTS Five-Year Summary ....12 Map. ..13 Project Detail..... 14-20 CITY OF PEARLAND 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM (CIP) TABLE OF CONTENTS PAGE PARKS PROJECTS Five-Year Summary 21 Map 22 Project Detail 23-32 FACILITIES PROJECTS Five-Year Summary 33 Map 34 Project Detail 35-42 STREETS PROJECTS Five-Year Summary 43 Map 44 Project Detail 45-60 CITY OF PEARLAND 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM (CIP) TABLE OF CONTENTS PAGE WATER PROJECTS Five-Year Summary 61 Map 62 Project Detail 63-78 WASTEWATER PROJECTS Five-Year Summary 79-80 Map 81 Project Detail 82-96 APPENDIX Glossary of Terms 97-98 INTRODUCTION The City of Pearland's Capital Improvement Program(CIP)has been developed in order to further our commitment to the citizens of Pearland by working to meet today's needs,as well as those of the future. From work on underground water and sewer lines to more visible projects such as street paving and extensions, the five-year CIP addresses the needs of the City through responsible City Government with a comprehensive and cost-effective approach. What is a Capital Improvement? A capital improvement is a major, non-routine expenditure for new construction, improvements to existing buildings, facilities, land, streets, storm sewers, and expansion of the City's park system to name a few. A capital improvement project has a relatively high monetary value($100,000+),long-life expectancy,and results in the creation of an asset or extends the life of existing assets. The cost of the capital improvement includes design, legal fees, land, operating equipment, furniture, construction, etc. that is necessary to put the asset into service. A capital improvement project is not the purchase of a piece of equipment such as a fire truck,vehicle,etc. What are the benefits of a Capital Improvement Program (CIP)? A long-term capital improvement program has many obvious benefits derived from its organized approach to planning projects. The program can focus attention on community and City goals and needs, allowing projects to be prioritized based on need. The CIP can be an effective tool for achieving goals set forth in the City's Comprehensive Plan, as well as the City's various master plans. Through proper planning, the need for bond referendums, bond issues or other revenue production measures can be foreseen and action can be taken to fund the projects as identified. CIP DEVELOPMENT PROCESS The development of a capital improvement program is a continual process and, consequently, should be viewed as a working document. Therefore,while the document covers a five-year planning perspective,it is revised every year in order to accommodate new projects,reflect changes in ongoing projects,and extend the program an additional year. The first year of the plan is incorporated into the annual budget to appropriate funds. Improvements identified in subsequent years are approved only on a planning basis and do not receive expenditure appropriation. Cost estimates for years two through five are also for planning purposes only,to be used in conjunction with the City's long-range financial plan for operations. As City projects related to Drainage, Streets, Parks and Facilities in the previous bond programs are completed, projects in future years are added in order to identify and quantify future needs. These projects are typically added to the Five-Year CIP as an unfunded project. These identified projects will then become a basis for the preparation of a future referendum. Projects included in the five-year CIP are either City managed projects, or include just the City's share of projects that will be managed by other agencies. If an outside agency will be contributing funding directly to the City for a project that the City will manage,then that cost and funding are included in the project budget. The Five-Year Capital Improvement Program(CIP)includes all capital projects,which are to be financed in whole or in part from funds subject to control or appropriation by the City. Therefore, the CIP includes bond appropriations (general obligation, certificates of obligation and revenue bonds), General Revenue—Cash, P.E.D.C., System Revenues—Cash, Impact Fees,and any Federal,State or private foundation grant funds received by the City for capital improvement projects. The City considers input from the citizens,the Planning and Zoning Commission,City staff members,and master plans in the Capital Improvement Program's preparation. A project list is compiled, prioritized by year, and cost estimates assigned. The Finance Department also looks at the overall effect of projects, including the need to issue debt, potential impact on the tax rate, and operations and maintenance impact on the City. The City Council, through workshops, reviews the draft with any recommended changes incorporated into the final document. A final draft of the Five-Year CIP is then prepared for Council consideration and approval.Upon Council adoption,the five-year CIP document is reproduced and distributed for implementation of the program. 2013-2017 CAPITAL IMPROVEMENT PROGRAM The Five-Year Capital Improvement Program for 2013 to 2017 totals $346,385,560. How is the Capital Improvement Program funded? Funding for CIP projects are derived from various sources, including General Obligation Bonds, Certificates of Obligation, Water&Sewer Revenue Bonds, Impact Fees, General Revenues, System Revenues, P.E.D.C., Federal and State Highway Funds, and Grant Funds. Projects identified as unfunded will be considered as part of a future bond referendum. Uses of the funding include Drainage,Streets, Facilities,Parks,Water,and Wastewater projects. The graph on the following page provides a breakdown of the funding sources and uses. ii 2013-2017 CIP 2013-2017 CIP by by Funding Source-$346 Million Project Type-$346 Million General PEDC Revenue-Cash 1% -\ 0% Certificates of Facilities Parks 0 Other Funding I / Obligation 5/° ° 10% Sources 4% ♦♦♦ `' ♦♦♦ Future GO •••• Unfunded •••••••• Bonds ♦♦•••.„. A 28% 29% •••• Water/Sewer •♦.,. ••••." Streets 33% ii 43% Impact Fees- i W/S Revenue •••♦♦ Debt Bonds 11% \ System 17% Revenues- Impact Fees- ' Cash Drainage Cash - 4% 70/0 1% iii PROJECT HIGHLIGHTS DRAINAGE Drainage projects include the construction of storm sewers,detention ponds,and underground drainage.These improvements will help reduce the risk of repetitive flooding in residential areas and provide storage capacity.Major drainage improvements include Lower Kirby Urban Center Regional Detention,Cullen/FM518 Regional Detention Pond,Old Townsite Drainage,D.L.Smith Detention Pond,and Cowerts Creek Diversion. PARKS Parks projects include Phase II of the Trail Connectivity project to connect Centennial Park to Independence Park,the construction of the Max Road Sports Complex Phase I with six international sized soccer fields,Shadow Creek Ranch Park Phase I,which will be a multi-purpose sports complex, Centennial Park Phase II, which will include the demolition of existing soccer fields and the construction of two new lighted softball fields,installation of a new picnic pavilion,and additional parking. Also included is Phase I of Independence Park that includes playground and pavilion improvements,additional parking,an amphitheater,and the construction of a 7,000 square foot Nature Center. Phase II of Max Road and Shadow Creek Ranch is included in the five-year CIP,however,a funding source has yet to be identified. FACILITIES Facility projects include the Intelligent Traffic System project,which will include major upgrades to the City's entire traffic signal system,including controllers,cameras,and the systems communication system. The reconstruction of Fire Station#3 will include the construction of approximately 10,000 square feet of space to house personnel from Fire and EMS,including dorm space,kitchen and dining area,day room and exercise room. The renovation of the Old Police Department Facility will accommodate relocating several City departments,Fire,EMS Administration,and Fire Marshal. Also included in Facility projects are:reconstruction of Fire Station #1,renovation at the City Hall Complex,Hillhouse Road Annex Phase II,and the expansion of the Tom Reid Library. STREETS Street projects include pavement rehabilitation,which replaces sections of existing failed pavement, road extensions,widening and reconstruction of some of the major streets in the City to improve mobility,congestion,and ride-ability.Major street projects include Business Center Drive, Pearland Parkway Extension, the expansion of CR94/Smith Ranch Road, extension of Fite Road, and widening of Max,Mykawa,and Old Alvin Roads. Paving in the Regency Park Subdivision and Bailey Road improvements are also included. Reconstruction of CR403 and Longwood,as well as McHard Road Extension,are identified as future projects. However,a funding source has yet to be identified. iv WATER/WASTEWATER Water and Wastewater projects include the construction of water and sewer lines, water wells, and treatment capability. Major projects include the design and construction of a Surface Water Plant,Pearland Parkway Waterline,installation of McHard Road 16" Waterline and Trunk Sewer,Fellows Loop,CR 94 Waterline,FM 1128 16"Waterline,CR 100 Waterline,and SH 35 Waterline from south of Magnolia Road. Also included are waterline installations for Harkey Road,Veterans Drive from Bailey,FM 521,and Grand Boulevard. The rehabilitation of Green Tee for improved water quality is also included. Wastewater projects include Southdown WWTP Expansion,Barry Rose WWTP Expansion,Veterans Drive Lift Station,and Mykawa/Scott SCADA Lift Station. v CITY OF PEARLAND 2013-2017 CAPITAL IMPROVEMENT PROGRAM TOTAL SUMMARY USE: 2013 2014 2015 2016 2017 TOTAL DRAINAGE 1,740,000 7,580,988 6,419,124 3,006,340 5,428,536 24,174,988 PARKS 6,137,902 7,441,258 2,707,652 4,206,829 15,416,361 35,910,002 FACILITIES 4,953,093 4,488,741 9,673,400 432,100 3,260,000 22,807,334 STREETS 6,808,392 13,505,856 14,963,516 32,324,517 83,073,109 150,675,390 WATER 1,903,662 9,233,100 7,974,649 25,545,380 17,750,723 62,407,514 WASTEWATER 1,061,204 2,426,883 8,239,258 10,172,028 28,510,959 50,410,332 TOTAL $ 22,604,253 $ 44,676,826 $ 49,977,599 $ 75,687,194 $ 153,439,688 $ 346,385,560 SOURCEOF FUNDS 2013 2014 - ' 4. "" :2016 E ' 2017€, ... TOTAL General Revenue-Cash 270,000 200,000 625,000 1,095,000 Certificates of Obligation 2,775,973 4,488,741 9,227,031 16,491,745 Future GO Bonds 8,905,662 17,400,822 19,764,986 34,558,560 17,121,285 97,751,315 W/S Revenue Bonds 4,693,171 9,476,320 17,248,424 26,711,754 58,129,669 P.E.D.C. 3,148,493 3,148,493 System Revenues-Cash 1,490,916 2,746,791 2,610,663 3,210,295 3,009,058 13,067,723 Impact Fees-Cash 1,326,454 571,008 516,489 269,900 2,683,851 Impact Fees-Debt 3,388,013 2,600,935 14,974,591 16,407,187 37,370,726 Unfunded 3,102,718 1,997,098 4,707,173 92,906,229 102,713,218 Other funding sources 5,300,892 7,468,324 2,608,337 200,000 15,577,553 Less projects appropriated in previous year (1,643,733) TOTAL $ 22,948,390 $ 43,859,588 $ 49,071,859 $ 75,168,943 $ 156,980,513 $ 346,385,560 Note:The totals do not tie by year as the City anticipates appropriating funds for GO Bond projects in one year and then selling the bonds in the next year. t CITY OF PEARLAND 2013 PROJECTS BY FUNDING SOURCE CERTIFICATES OF OBLIGATION Project No. Project Name Amount PARKS P20006/P50072 Trail Connectivity 525,000 Sub-Total $525,000 FACILITIES TR1204 Intelligent Traffic System 1,457,040 FA1302 Fire Station#3 Reconstruction 289,368 FA0905 Old Police Department Renovations 504,565 Sub-Total $2,250,973 CERTIFICATES OF OBLIGATION TOTAL $2,775,973 2 CITY OF PEARLAND 2013 PROJECTS BY FUNDING SOURCE FUTURE GO BONDS Project No. Project Name Amount STREETS TR1203 Pearland Parkway Extension 1,903,192 TR1303 CR 94 Expansion 1,145,471 T20002 Old Alvin Road Widening 400,000 Sub-Total $3,448,663 DRAINAGE DR1103 Cullen/FM 518 Regional Detention Pond 614,000 Sub-Total $614,000 PARKS P20005 Max Road Sports Complex Phase I 2,264,110 P50071 Centennial Park Phase II 354,000 P20002 Shadow Creek Ranch Park Phase I 2,224,889 Sub-Total $4,842,999 FUTURE GO BONDS TOTAL $8,905,662 3 CITY OF PEARLAND 2013 PROJECTS BY FUNDING SOURCE PEDC Project No. Project Name Amount STREETS TR0811 Business Center Drive 3,148,493 Sub-Total $3,148,493 PEDC TOTAL $3,148,493 4 CITY OF PEARLAND 2013 PROJECTS BY FUNDING SOURCE SYSTEM REVENUES-CASH Project No. Project Name Amount WATER WA1001 General Engineering/CIP Administration 75,000 Pearland Parkway Waterline from Shadycrest to WA1206 Dixie Farm Road 168,950 WA1301 Hughes Ranch Road 8"Waterline 60,000 WA1302 SH35 Waterline from FM518 to Magnolia 259,358 WA1303 CR 94 Waterline 100,045 Sub-Total $663,353 WASTEWATER WW1202 Broadway Trunk Sewer Extension 50,847 WW1203 Walnut Lift Station 588,000 WW1303 Eliminate Somersetshire Lift Station 151,844 WW1304 West Oaks Lift Station Retirement 36,872 Sub-Total $827,563 SYSTEM REVENUES-CASH TOTAL $1,490,916 5 CITY OF PEARLAND 2013 PROJECTS BY FUNDING SOURCE IMPACT FEES-CASH Project No. Project Name Amount WATER WA1201 McHard Road 16"Waterline 629,857 Pearland Parkway Waterline from Shadycrest to WA1206 Dixie Farm Road 251,050 WA1302 SH35 Waterline from FM518 to Magnolia 259,357 WA1303 CR 94 Waterline - _ 100,045 Sub-Total $1,240,309 WASTEWATER WW1202 Broadway Trunk Sewer Extension $86,145 Sub-Total $86,145 IMPACT FEES-CASH TOTAL $1,326,454 6 CITY OF PEARLAND 2013 PROJECTS BY FUNDING SOURCE OTHER FUNDING SOURCES Project No. Project Name Amount DRAINAGE DR0602 Cowerts Creek Diversion 200,000 DR1301 Lower Kirby Urban Center Regional Detention 750,000 DR1302 Old Townsite Drainage 176,000 Sub-Total $1,126,000 FACILITIES TR1204 Intelligent Traffic System 3,228,160 FA0905 Old Police Department Renovation 140,000 Sub-Total $3,368,160 STREETS TR0811 Business Center Drive 659,236 Sub-Total $659,236 WASTEWATER WW1302 Mykawa/Scott SCADA Lift Station 147,496 Sub-Total $147,496 OTHER FUNDING SOURCES TOTAL $5,300,892 GRAND TOTAL ALL FUNDS $22,948,390 7 CITY OF PEARLAND 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL PAGE LOCATION Project No. Project Name Detail Page DR0602 Cowerts Creek Diversion 14 DR1301 Lower Kirby Urban Center Regional Detention 15 DR1103 Cullen/FM 518 Regional Detention Pond 16 DR1302 Old Townsite Drainage 17 DR1401 Piper Drainage&Sidewalks 18 DR2002 D.L. Smith Detention Pond Expansion Phase I 19 DR1501 PER for Future Bond Referendum 20 P20005 Max Road Sports Complex Phase I 23 P50071 Centennial Park Phase II 24 P20002 Shadow Creek Ranch Park Phase I 25 P20006/P50072 Trail Connectivity 26 P20001 Independence Park Phase I 27 P20004 Delores Fenwick Nature Center Phase I 28 PK1501 PER for Future Bond Referendum 29 PK1601 Max Road Sports Complex Phase II 30 PK1602 Shadow Creek Ranch Park Phase II 31 PK1502 Hunter Park 32 TR1204 Intelligent Traffic System 35 FA1302 Fire Station#3 Reconstruction 36 FA0905 Old Police Department Renovation 37 FA1401 Fire Station#1 38 FA0904 City Hall Complex Renovations 39 8 CITY OF PEARLAND 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL PAGE LOCATION Project No. Project Name Detail Page F20002 Tom Reid Library Expansion 40 FA1203 Hillhouse Road Annex Phase II 41 FA1601 Fire Station#2 42 TR0811 Business Center Drive 45 TR1203 Pearland Parkway Extension 46 TR1202 Fite Road 47 TR1205 Max Road 48 TR1303 CR 94 Expansion 49 TR1402 Regency Park Subdivision Paving 50 T08002 Bailey Road-Veterans to FM 1128 51 T20002 Old Alvin Road Widening(Plum Street to McHard Road) 52 TR0803 Old Townsite Area Sidewalks 53 TR1201 CR 403(Hughes Ranch Road) 54 TR1501 PER for Future Bond Referendum 55 TR0601 Mykawa Road Widening(BW8 to FM 518) 56 TR1601 McHard Road Extension(Mykawa Road to Cullen Parkway) 57 TR1602 Longwood Street Reconstruction 58 TR1603 Grand Boulevard Reconstruction 59 TR1401 Sidewalk Installation 60 WA1001 General Engineering/CIP Administration 63 WA1201 McHard Road 16"Waterline 64 WA1206 Pearland Parkway Waterline from Shadycrest to Dixie Farm Rd. 65 9 CITY OF PEARLAND 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL PAGE LOCATION Project No. Project Name Detail Page WA1301 Hughes Ranch Road 8"Waterline 66 WA1401 Old City Hall Ground Storage Tank 67 WA1302 SH 35 Waterline from FM 518 to Magnolia 68 WA1303 CR 94 Waterline 69 WA1203 Fellows Loop 70 WA0812 Surface Water Plant 71 WA1501 FM 1128 16"Waterline 72 WA1502 CR 100 Waterline 73 Harkey Rd.from CR 100 to CR 128&CR 128 from Harkey to WA1503 Veterans 74 WA1504 Veterans Drive from Bailey Road to CR 100 16"Waterline 75 WA1505 FM 521 Waterline from Broadway to Mooring Pointer 76 WA1601 Grand Boulevard Waterline-Old Townsite SE Quadrant 77 WA1701 Green Tee Rehabilitation 78 WW1202 Broadway Trunk Sewer Extension 82 WW1203 Walnut Lift Station 83 WW1302 Mykawa/Scott SCADA Lift Station 84 WW1304 West Oaks Lift Station Retirement 85 WW1303 Eliminate Somersetshire Lift Station 86 WW1201 Southdown(North Central)WWTP Expansion 87 WW1301 Orange Mykawa Lift Station Retirement 88 WW1401 Oak Brook Estates Lift Station 89 to CITY OF PEARLAND 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL PAGE LOCATION Project No. Project Name Detail Page WW1403 West Lea Force Main 90 WW1402 Pearland Heights Lift Station 91 WW1601 McHard Road Trunk Sewer(Mykawa to Southdown WWTP) 92 WW1501 Roy/Max/Garden Roads Basin Sewage System 93 WW1502 Barry Rose WWTP Expansion 94 WW1602 Veterans Drive Lift Station Service Area 95 WW1603 JHEC WWTP Expansion 96 CITY OF PEARLAND 2013-2017 CAPITAL IMPROVEMENT PROGRAM DRAINAGE Project No. Project Name 2013 2014 2015 2016 2017 TOTAL DR0602 Cowerts Creek Diversion 200,000 1,600,000 _ _ 1,800.000 DR1301 Lower Kirby Urban Center Regional Detention 750,000 2,800,000 1,767,000 2,528,000 7,845,000 DR1103 Cullen/FM 518 Regional Detention Pond 614,000 3,708,000 4,322,000 DR1302 Old Townsite Drainage 176,000 483,000 1,929,200 826,800 3,415,000 DR1401 Piper Drainage&Sidewalks 589,988 589,988 DR2002 D.L.Smith Detention Pond Expansion Phase I 122,924 2,179,540 2,900,536 5,203,000 DR1501 PER for Future Bond Referendum 1,000,000 1,000,000 TOTAL $ 1,740,000 $ 7,580,988 $ 6,419,124 $ 3,006,340 $ 5,428,536 $ 24,174,988 SOURCE OF FUNDS 2013 2014 2015 2016 2017 TOTAL General Revenue-Cash Certificates of Obligation 1,000,000 1,000,000 Future GO Bonds 614,000 4,780,988 3,529,200 2,162,418 3.867,382 14,953,988 W/S Revenue Bonds P.E.D.C. System Revenues-Cash Impact Fees-Cash • Impact Fees-Debt Unfunded 2,800,000 1,767,000 2,528,000 7,095,000 Other Funding Sources 1,126,000 1,126,000 Less Projects Appropriated in Previous Year 0 TOTAL $ 1,740,000 $ 7,580,988 $ 6,296,200 $ 2,162,418 $ 6,395,382 $ 24,174,988 Note:The totals do not tie by year as the City anticipates appropriating funds for GO Bond projects in one year and then selling the bonds in the next year or vice versa. 12 • +i. .� ]_/ l E_ fv iY ! - ` — * ne Eapem0et b , -'i Y41, `. _ 1 - 9�37 ". _ _ 1 r a _y, 3olsxm �L►: Fy'y ✓ �`Cn ' ti 1 .0 r`t-1 k 1 14r�'S�7e Y' i� (y ' , i.:..-:tat_.,,,;," ,3. 1 I-1 - ti • •.a* E'. iI*`y. t# ' =i 11E , - %. -Y` { r 'f :' { E-, -4j r, 3d S _u _ _ - + ' > i ' .11S !i] tCl1 �- 1 _a"�i liK�t; 0 �' ;F oar mot. ,Y .� - �� 6 i ea.a a �'7. -,� • W ptil1tard '47 i ,/ /�k /r .'�•fi"'• �l` KK • ce•', .., �-,`^ ['`1 a+y�ift• '�'Y``� .�l. � ` r�� �- �� * �_,. /` r � '� ' ,.. . _ ..,„:,.0 v(,� V "-- I _ �1�, ,f--*. »tors • �►��"Y,-• J • ddd 71 - ,., , �p. Imo., 4" it S .., _ j r rTl r tr{'1 p 1 ,4,I1 i , f , `�1 u�4 F. ( ?�u4 I s ,4. l r maim i y �tltl '?4� f i '1 _ .: I iH 6 . r_l ! r1 l6'� I I .-� 1 r T >` 7b ! r'-. ' /. `'>. �' j, 1 ��-?.' ; r .6 Isi -i t ' fq `'r� I t ...r. `, � �{� • {• , 1...t City]of Pearland 0 Ca FA1516',—,—DeienC POM 301}3016 —Pper Draina0e 65dewa163016 2O I3 2O I C I P (`,,—Lavwe d LNabs Urban Carnet Regwnal Deleniwn 3012-3015 3012 0.5 2 DSmiM Delenlwn E.F.Phase 130 15-3017 Cw es Creek Drvw wn 201]30t5 Ah Niles AO.Towns.Draw,.30t]-2016 'rWIE swrostasswwwwwwwwwwwwowwwww Drainage :rv.�. a GIS CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER Cowerts Creek Diversion DR0602 1 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Cowert Creek Diversion and Regional Detention for the Bailey Rd corridor Impact on operating budget No Yes(SeeBelow) between FM 1128 and wells Rd. Phase J of this project will entail construction of approximately 4,300 if of interceptor box culvert, 3.2 Fiscal Year 2013 2014 2015 2016 2017 miles of diversion ditches, a 1,200 ac-ft regional detention facility and Total Revenue associated culvert and road ditch improvements. Project will be performed in cooperation with BDD#4 under the terms of an inter-local agreement. personnel services _ Operation and Maintenance Capital Outlay _ PROJECT JUSTIFICATION Total Expense The basis of this diversion and detention project_is—to separate the FTE Staff Total J drainage corridor out of the Bailey Rd (FM1128 to veterans) transportation Cost Avoidance/Payback period Explanation: corridor, thereby allowing for the development of both the ultimate transportation and drainage facilities in adequately sized, separate corridors. 1.11.1111111.1 FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION ESTIMATED TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Prelim. Engineering Report S0 Land/Right of way $4,650,000 S500,000 $300,000 $300,000 $200,000 5500,000 Design/Surveying S1,400,000 S1,646,894 S1,646,894 S1,646,894 S1,646,894 construction S15,021,276 S11,664,556 S10,064,556 510,064,556 S1,600,000 311,664,556 Equipment and Furniture SO Contingency S955,174 $615,000 S615,000 $615,000 $615,000 TOTAL COSTS S22,026,450 S14,426,450 $12,626,450 $12,626,450 $200,000 S0 41,600,000 So 60 S14,426,450 FUNDING SOURCES ESTIMATED TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash S15,000 S15,000 515,000 S15,000 S15,000 certificates of obligation SO Future GO Bonds S8,512,000 $8,512,000 S6,912,000 $6,912,000 $1,600,000 $8,512,000 W/S Revenue Bonds SO P.E.D.C. So System Revenues - Cash SO Impact Fees SO unfunded SO Other Funding sources' - S13,549,450 S5,899,450 S5,699,450 S5,699,450 $200,000 S5,899,450 TOTAL SOURCES S22,076,450 S14,426,450 512,626,450 S12,626,450 S200,000 SO S1,600,000 60 SO $14,426,450 1 Explain & Identify Type of Other sources: Other funding sources - BCDD#4 in-kind services total $7.6 million $1,950,000 from T70061 in 2007 Project Manager: Cara Davis $1,249,450 from T70061 in 2008 Reallocation from Town Ditch Bonds in 2010 Reallocation from East Mary's in 2013 14 Project's Approval Date: 3/14/2012 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER Lower Kirby Urban Center Regional Detention DP1301 3 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS 'Fills project will-Trovide regional storm water detention for the area bounded by B08 No Yes(See Below) to the north, Clear Creek to the south, Kirby Drive to the west, and 551288 to the Impact on operating budget east. Based on preliminary studies, the system will consist of two detention ponds Fiscal Year 2013 2014 2015 2016 2017 near Clear Creek, combined with a widening of the TxDOT ditch to provide conveyanc, and storage between BW8 and Clear creek. The drainage study for the area is expected Total Revenue _ to be completed by the end of FY2012. Approvals by TxDOT, HCFCD, and 131:1D4 along — with detail design will move forward in F02013. The initial construction phase will personnel Services reprove the City's existing pond. subsequent projects will be developer driven ant, . funded. Operation and Maintenance capital Outlay PROJECT JUSTIFICATION Total Expense TFIrs—FOTea—Z-s---cirie—OT the highest priority projects from the City's Regional fp II I I I I I Detention study conducted in 2010. The concept is also supported by the Lower Kir " Eta Taotel a urban Center master Plan and Implementation strategy. The project will allow Cost period Explanation: properties within the sub-watershed boundaries to contribute to the construction of the system or buy-in to the detention system in-lieu of constructing individual ponds on each property, increasing the amount of developable land. IMPACT IEVEL . FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Prelim. Engineering Report SO Land/Right of Way $1,386,000 $1,386,000 $1,386,000 $1,386,000 Design/Surveying $650,000 $650,000 S650,000 $650,000 Construction $5,709,000 S5,709,000 $2,800,000 $1,767,000 41,142,000 $5,709,000 Equipment and Furniture $0 Contingency $100,000 $100,000 $100,000 $100,000 TOTAL COSTS $7,845,000 $7,845,000 $0 SO $750,000 $2,800,000 S1,767,000 SO $2,528,000 $7,845,000 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash 80 Certificates of Obligation SO Future GO Bonds SO W/S Revenue Bonds $0 P.E.D.C. SO . system Revenues - Cash SO . Impact Fees SO unfunded $7,095,000 $7,095,000 $2,800,000 $1,767,000 S2,528,000 $7,095,000 other Funding Sources' - $750,000 4750,000 $750,000 5750,000 TOTAL SOURCES $7,845,000 $7,845,000 so SO $750,000 S2,800,000 $1,767,000 $0 $2,528,000 $7,845,000 1 Explain & Identify Type of Other Sources: Funds from Fund 200 - Spectrum Regional Detention Project Manager: Andrea Brinkley Project's Approval Date: 4/23/2012 15 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER J'fl' iona C 1FM 518 RegT-Detention Pond __ DR1103 .1 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Future storm water regional detention pond located at the southwest quaarant Impact on operating budget No Yes(See Below) of FM 518/Cullen Parkway intersection. The project will include construction Fiscal Year 2013 2014 2015 2016 2017 of detention pond, existing ditch improvements and possible underground storm sewer improvements required to convey development runoff. Total Revenue Personnel Services Operation and Maintenance capital outlay PRO3ECTv7USTIFICATIOM'S59 u .0. a;E:�m ,o,.uoV.eHx Y,. .-- eH- 'O";,.: Total Expense The proposed detention pond is to provide the required detention for future'FTE Staff Total 1 1 I J development of approximately 155 acres of undeveloped land. The detention Cost Avoidance/Payback peril Explanation: pond will allow for future development along FM 518 at this location to fully develop without the need for individual detention ponds which has been a priority established by City Council from Regional Detention Study. IMPACT ON SERVICE LEVE FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION ESTIMATED TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Prelim. Engineering Report 8250,000 8250,000 8250,000 8250,000 4250,0uu Land/Right of Way S264,000 S264,000 $264,000 $264,000 Design/surveying S350,000 S350,000 S350,000 $350,000 Construction S3,110,000 $3,110,000 S3,110,000 S3,110,000 Equiement and Furniture SO Contingency $598,000 4598,000 $598,000 $598,000 TOTAL COSTS S4,572,000 $4,572,000 S250,000 S250,000 S614,000 S3,708,000 SO S0 60 $4,572,000 FUNDING SOURCES ESTIMATED TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO certificates of obligation SO Future GO Bonds S4,572,000 $4,572,000 S250,000 S250,000 $614,000 S3,708,000 S4,572,000 w/s Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees SO unfunded SO Other Funding Sources' - SO TOTAL SOURCES S4,572,000 S4,572,000 $250,000 $250,000 $614,000 $3,708,000 $0 SO $0 $4,572,000 ' Explain & Identify Type of Other Sources: Partial offset by regional detention fees. Project Manager: TBD Savings from E. Mary's &Town Ditch voted authorization for Drainage Projects. Assumes BDD# 4 will maintain. Project's Approval Date: 3/14/2012 16 CITY OF PEARLAND, TEXAS 2013 — 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT # PREFERENCE ORDER -_' EF_, --_---- -REFER__PREFERENCE ORDER old Townsite Drainage OR1302 5 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS The C,ty s Su0RegiondT Detention Master Plan ,dentil'iea en area Tocated within the Impact on operating budget No Yes(See Below) City's old Townsite as a potential location for a sub-regional detention pond. The 41- acre service area is located at the northwest corner of Walnut and Galveston and extends Fiscal Year 2013 2014 2015 2016 2017 to 5R35 and FMS18, which is within the southeast quadrant of the Old Townsite. The stop,. . of the project will be to develop a drainage and detention plan for serving the area with Total Revenue a sub-regional detention pond and will include the development of a PER that determine r - - - -- - pond location, pond size, and conveyance to the sub-regional facility. Personnel Services Operation and Maintenance Capital Outlay PROJECT JUSTIFICATION Total Expense ___ _ The need for su -regional e�teni,on has been a p7T1'Tf set by c—OrrT il-wPTch-Ted to the FTE Staff Total development of the sub-Regional Detention Pond Master Plan. One of the short-tern priority projects was a pond located within the southeast quadrant of the old Townsite.Cost Avoidance/ Payback period Explanation: Phase one focuses on the area located between walnut 5t. and Fm518. Re-development of this portion of the Old Townsite has been difficult primarily because of the inability to construct on-site detention. Implementation of this project will help alleviate that issue allowing for approximately 15 acres to develop and will also provide regional detention for the re-development or expansion of approximately 20 acres. In addition tc this, the detention pond will also serve and mitigate the impacts of the expansion of the roadway network within this portion of the old Townsite. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION ESTIMATED TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Prelim. Engineering Report SO Land/Right of Way $176,000 S176,000 ' 4176,000 4176,000 Design/Surveying $483,000 $483,000 S483,000 S483,000 Construction S2,756,000 S2,756,000 S1,929,200 S826,800 S2,756,000 Equipment and Furniture S0 Contingency SO TOTAL COSTS S3,415,000 33,415,000 SO SO S176,000 S483,000 S1,929,200 $826,800 SO S3,415,000 FUNDING SOURCES ESTIMATED TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds S3,239,000 S3,239,000 _ $483,000 S1,929,200 S826,800 S3,239,000 W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash So Impact Fees SO Unfunded S0 other Funding Sources' - S176,000 176,000 S176,000 $176,000 TOTAL SOURCES $3,415,000 $3,415,000 S0 S0 S176,000 S483,000 S1,929,200 S826,800 SO S3,415,000 1 Explain & Identify Type of Other Sources: Reallocation of Town Ditch & Veterans/Walnut Project Manager: Engineering 17 Project's Approval Date: 3/14/2012 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT # PREFERENCE ORDER .,pOral _ l nag__&__—f_e_________�____ — — ________________________-__-___--___________�__ Piper Drainage & Sidewalks DR1401 g PROJECT DESCRIPTION _ INCREMENTAL OPERATING AND MAINTENANCE COSTS Enc ose ditches along-Piper—between the pipejine easement south oT"FM518 Impact on operating budget No _Yes(See Below) and Fite Road (approx. 2560 ft.) This system will connect to the existing storm sewer on Fite Road and includes dredging of the linear detention pond Fiscal Year 2013 2014 2015 2016 2017 just east of the elementary school at Fite and FM1128. The storm water Total Revenue pump system at the school will be eliminated as a result. This project also includes sidewalks. Personnel Services operation and Maintenance Capital Outlay PROJECT JUSTIFICATION ;--. - Total Expense The project was anticipated in the 2001 bond referendum;—however, it was FTE Staff Total eliminated from the Fite Road project before construction. This work will Cost Avoidance/ Payback period Explanation: relieve flooding and high water issues along Piper. IMPCLagNAcENNiGg.a cv ..; FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION ESTIMATED THRU PROJECT TOTAL BUDGET CITY APPROP. FUNDED BUDGET 2012 2013 2014 2015 2016 2017 TOTAL Prelim. Engineering Report S0 Land/Right of way SO Design/Surveying 467,048 S67,048 S67,048 S67,048 Construction $475,400 $475,400 S475,400 $475,400 Equipment and Furniture S0 Contingency S47,540 S47,540 S47,540 S47,540 TOTAL COSTS $589,988 $589,988 S0 S0 SO $589,988 S0 S0 S0 $589,988 FUNDING SOURCES ESTIMATED THRU PROJECT TOTAL BUDGET CITY APPROP. FUNDED BUDGET 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash S0 Certificates of Obligation S0 Future GO Bonds S589,988 S589,988 $589,988 S589,988 w/S Revenue Bonds S0 P.E.D.C. S0 System Revenues - Cash SO Impact Fees SO unfunded SO Other Funding Sources' - S0 TOTAL SOURCES S589,968 $589,988 So S0 S0 $589,988 So S0 So $589,986 ' Explain & Identify Type of Other Sources: Project Manager: Public Works 18 Project's Approval Date: 3/14/2012 CITY OF PEARLAND, TEXAS 2013 — 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER — D.L. Smith Detention Pond Expansion Phase I DR2002 7 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS -_.--__U -PT__.___- __-__ .+v_____-_.__r_ __--.--_ Pfiase I Of tie pro)ect wiTrexpan(�the exlsting DL Smtt l�ffetention {YC i7ity Impact on operating budget No Yes(See Below) by approximately 150 acre-feet. The expansion will occur to the west of Fiscal year 2013 2014 2015 2016 2017 the existing McHard Road outfall ditch and south of the pipeline easement. A future phase will add an additional 150 acre-feet of detention for Total Revenue _ further flood plain improvements and regional detention. Personnel Services operation and Maintenance Capital Outlay PROJECT:.JUSTIFICATION Total Expense In accordance with the Clty s Master Drainage Plan, there is a need or FTE Staff Total additional storage capacity along the clear creek watershed to mitigate. cost Avoidance/Payback pe7iod Explanation: existing flooding and provide capacity for future development. This expansion will lower the 100-year water surface elevation of clear Creek, alleviate existing flood plain issues, accommodate future development along McHard Road between old Alvin and Pearland Parkway, and be able to provide detention for the expansion of the University of Houston Clear Lake - Pearland campus and other potential city facilities on D.L. Smith site. IMPACT-ON SERVICE LEVELS FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION ESTIMATED THRU TOTAL BUDGET CITY APPROP. FUNDED BUDGET 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Prelim. Engineering Report S88,036 188,036 S88,036 S88,036 S88,036 Land/Right of way SO Design/surveying S861,540 S861,540 $122,924 S738,616 S861,540 construction $12,121,390 S4,124,390 S1,368,881 S2,755,509 S4,124,390 Equipment and Furniture SO Contingency $217,070 S217,070 S72,043 S145,027 $217,070 TOTAL COSTS S13,288,036 S5,291,036 $88,036 S88,036 So SO ' $122,924 S2,179,540 S2,900,536 S5,291,036 FUNDING SOURCES ESTIMATED THRU TOTAL BUDGET CITY APPROP. FUNDED BUDGET 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of obligation 488,036 S88,036 488,036 S88,036 S88,036 Future GO Bonds S5,203,000 $5,203,000 S1,335,618 S3,867,382 S5,203,000 W/S Revenue Bonds SO P.E.D.C. SO system Revenues - Cash SO Impact Fees SO unfunded SO Other Funding Sources' - S7,997,000 SO TOTAL SOURCES S13,288,036 55,291,036 $88,036 S88,036 SO 80 50 S1,335,618 S3,867,382 S5,291,036 1 Explain & Identify Type of Other Sources: In kind services totaling S7,997,000 from BDD #4 for future phases. Assumes BOO #4 will maintain. Project Manager: Skipper Jones S966,846 in 2016 to be funded by bonds in 2017. 10 Project's Approval Date: 3/14/2012 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT P FREEORER _—� ________--_ PERTor Future Bond Referendum DR1S01 B PROJECT DESCRIPTION _ INCREMENTAL OPERATING AND MAINTENANCE COSTS rov Pide funding for i prelminary enginee n ng on 'uture protects yet to Impact on operating budget ''No Yes(See Below) be identified that would be funded with the City's next bond referendum. Preliminary engineering would tighten down scopes and Fiscal Year 2013 2014 2015 2016 2017 provide for estimated construction dollars that would be needed to Total Revenue take a proposition to the voters. Personnel Services Operation and Maintenanc Capital Outlay PROJECT JUSTIFICATION Total Expense - _ FTE Staff Total Cost Avoidance/ Payback period Exp anation: FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Prelim. Engineering Report 41,000,000 41,000,000 S1,000,000 S1,000,000 Land/Right of Way SO Design/Surveying S0 Construction SO Equipment and Furniture SO Contingency SO TOTAL COSTS S1,000,000 $1,000,000 SO SO SO SO 51,000,000 SO SO S1,000,000 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of Obligation 41,000,000 41,000,000 41,000,000 S1,000,000 Future GO Bonds SO w/S Revenue Bonds SO P.E.D.C. SO system Revenues - cash SO Impact Fees SO Unfunded SO Other Funding Sources' - SO TOTAL SOURCES S1,000,000 S1,000,000 S0 SO S0 S0 S1,000,000 S0 SO S1,000,000 ' Explain & Identify Type of Other Sources: Project Manager: Projects 20 Project's Approval Date: 3/14/2012 CITY OF PEARLAND 2013-2017 CAPITAL IMPROVEMENT PROGRAM PARKS Project No. Project Name 2013 2014 2015 2016 2017 TOTAL P20005 Max Road Sports Complex Phase 1 3.559,714 3,559,714 P50071 Centennial Park Ph 2 354,000 1,373,658 542,342 2,270,000 P20002 Shadow Creek Ranch Park Ph 1 1,699,188 6,067,600 7,766,788 P20006/ P50072 Trail Connectivity 525,000 725,000 725,000 1,975,000 P20001 Independence Park Ph 1 179,810 1,906,803 1,231,387 3,318,000 P20004 Delores Fenwick Nature Center-Ph 1 158,000 736,026 1,471,974 2,366,000 PK1501 PER for Future Bond Referendum 500,000 500,000 PK1601 Sports Complex at Max Road Ph 2 486,000 3,724,000 4,210,000 PK1602 Shadow Creek Ranch Park Ph 2 1,078,000 8,264,000 9,342,000 PK1502 Hunter Park 602,500 602,500 TOTAL $ 6,137,902 $ 7,441,258 $ 2,707,652 $ 4,206,829 $ 15,416,361 $ 35,910,002 SOURCE OF FUNDS 2013 2014 2015 2016 2017 TOTAL General Revenue-Cash 270,000 525,000 795,000 Certificates of Obligation 525,000 1,517,031 2,042,031 Future GO Bonds 4,842,999 6,624,020 2,560,136 1,777,724 3,687,316 19,492,195 W/S Revenue Bonds P.E.D.C. System Revenues-Cash Impact Fees-Cash Unfunded 1,564,000 11,988,000 13,552,000 Other Funding Sources 358,469 200,000 558,469 Less Projects Appropriated in Previous Year (529,693) TOTAL $ 5,367,999 $ 6,624,020 $ 4,705,636 $ 3,341,724 $ 16,400,316 $ 35,910,002 Note:The totals do not tie by year as the City anticipates appropriating funds for GO Bond projects in one year and then selling the bonds in the next year. 21 -1, mil.r—iiiiiitar 11 .• 1_.rrill '' i - • .. �'IP + doff - �o �3�> � fi� 4 h�[.�..'- as £ ;,;, : II vii`� r 4 'r� t' Crsek Ranch Par1M1 EErr1 .,5. L.S ikr5 • p ..L.;` __a .." [R�,-Lir.. '4. , � """"""-��- " zr ` _s ',l fe o.4-40: �r s_.i 21 a . 1 �. .. a\Il lliw 4 ,1 taaT.'1�+ — . , i �Ai (�C •, i�l 111 ^ 1I III1Grill -r// A ( J . „„ . 2 s - 11IfMiili+lciii / ' �' t, L. 41 J J 6 Y O�, I (� y, < Rwa M.a gi �� 'titl 'wM �,�/r� �y.�i G F� f A ._ri....„,,, .. _� 2p1dldliio13 ��iil auc wMn f Y r11 ! -VI a xNs 2313.2NT i. tl� is ti r {tyl!1 a E GI TM11` �v�p�,..ar .awa nl n f.vv�'� ~ r 011411113 _ -9 �, ' + - Jar, r mat" sa3.x,.:10 /^a")4)J k. _ = � 1*- AP iw3 1 i ' N 11J _ 11 a ' i* Jl , %'' �ii r _s �`• •rr 9 in G d s F w - q=a,5 f ' ,`im � A � � _` r Cty '1, bo�� a ti. �F }N%.•s (4 :,v, . <J -i t. rg, cz ' i ` aril E E ,. .it" -^1•- 6r■�,� '_IWun carrY�Hll Y41 Irb rca hrl M.l� ' _ S 11 ii. elf r/o � r_�y r f:. I •' s \ 6. tpi • • ES i R city of Pea rla n d max Rd Sourer Complex Ph 12013 0 IndepenEmm P.Ph 1201,2011 Trill Conmclrvh Ph 11013 2015 2012 2013-2017C1P 0 RenlroPanl0rts r151MaRm0 r2013-012 L, Car Monis,Park Ph II 201125 1011Wrrall Delores Peso.HalorsCenterlPhI015201) ConmclrvhPn III 201)01501] a i'�l Q Q5 Mlles Parks 0 Shadow c...Ranch Pro M 1 2013-01a 0 Shadow Crwl Ranch Pa.Ph II0162012 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECTNAME -------�---____ PRDJECT', -PREFERENCE ORDER __________ _____ Max Road sports Complex Phase I P20005 1 PROJECT DESCRIPTION _ INCREMENTAL.OPERATING AND MAINTENANCE COSTS 'Proposed improvements include six internionalat -sized (11 vs.11) fields.Impact on operating budget ❑No ❑yes(SeeBelow) parking, and restrooms. Approximately 1-3 fields will be lit and the park will be located inside of a detention facility. Fiscal year 2013 2014 2015 2016 2017 Total Revenue $17,000 S17,000 S17,000 $17,000 Personnel services S52,723 S54,725 S56,787 S58,975 Operation and Maintenance $279,210 S279,210 S296,210 S308,210 Capital Outlay $6,527 S5,027 $5,027 S5,027 PROJE�CTe4MSTIFIGTION4 €44M 'iWAOlMM I ATO ,i 4q���IW�I .i-�'1 M Total Expense S338,460 S338,963 S358,024 $372,212 There is a significant need for game soccer fie s an sports fields in t e',TE Staff Total 1.0 City. With the development of this facility Centennial Park will be able to b,Cost Avoidance/Payback period Explanation: converted to a facility for youth softball that will allow the youth soccer program, youth softball program and the youth baseball program to expand as the population in the community increases. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET TNRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report S13,764 S13,764 S13,764 S13,764 S13,764 Land/Right of Way So Design/Surveying S346,403 S346,403 $346,403 S346,403 S346,403 construction S3,235,960 S3,235,960 $2,264,110 S3,235,960 S3,235,960 Equipment and Furniture SO Contingency S323,754 S323,754 S323,754 S323,754 TOTAL COSTS 1 S3,919,881 S3,919,881 S2,624,277 S360,167 $3,559,714 S0 SO SO SO S3,919,881 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET TNRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO certificates of Obligation S13,524 S13,524 $13,524 S13,524 S13,524 Future GO Bonds S3,776,706 S3,776,706 S2,481,102 S213,000 S2,264,110 S1,299,596 S3,776,706 w/s Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees S0 unfunded S0 Other Funding Sources' - S129,651 S129,651 S129,651 $129,651 $129,651 TOTAL SOURCES S3,919,881 S3,919,881 $2,624,277 $356,175 $2,264,110 $1,299,596 S0 SO SO $3,919,881 1 Explain & Identify Type of Other Sources: Zone 6 Parkland fees and Fund 201 Fund Balance. Project Manager: Andrea Brinkley Project's Approval Date: 3/14/2012 23 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER Centennl Park PI ET" P50071 ----------__�___ _______ ___ ____ Centennial 2 PROJECT DESCRIPTION _ INCREMENTAL OPERATING AND MAINTENANCE COSTS P-iase II of-Centennia3 Parkins Tunes the demoTTt3on othe--xis ting soccer Impact on operating budget ❑No Oves(See Below) fields, the construction of two new lighted softball fields, the installation of a new picnic pavilion and additional parking for the complex. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue $27,500 $27,500 427,500 Personnel Services $33,618 447,010 447,951 Operation and Maintenance 438,081 $50,846 $50,903 Capital outlay PROJECT JUSTIFICATION. Total Expense S71,700 S97,856 $98,853 Once the max Road sports Complex is completed, youth and adult soc e7 will om FTE Staff Total I I I 1.01 e Centennial mark to max Road where the program can be expanded. The existing soccer fields will be demolished and converted to lighted softball fields. Girls softballs will move Cost Avoidance/Payback period Explanation: from the Dad's club to Centennial Park, allowing their program to expand as the population increases. Adult softball will ultimately move to the Shadow Creek Ranch complex once completed to make room for girls softball. IMPACT ON SERVICE LEVELS ..fir ,id(s - I' . FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report 5207,000 4207,000 $207,000 $207,000 Land/Right of Way 4495 $495 $495 $495 4495 Design/Surveying $147,000 4147,000 4147,000 $147,000 Construction 41,732,200 $1,732,200 $1,189,858 $542,342 41,732,200 Equipment and Furniture S0 Contingency $183,800 $183,800 $183,800 $183,800 TOTAL COSTS 42,270,495 42,270,495 $495 $495 $354,000 $1,373,658 $542,342 $0 $0 $2,270,495 1 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash S270,495 $270,495 $495 S495 $270,000 $270,495 Certificates of Obligation 40 Future GO Bonds $2,000,000 $2,000,000 $354,000 S1,373,658 $272,342 42,000,000 W/S Revenue Bonds $0 P.E.D.C. SO System Revenues - Cash $0 Impact Fees $0 unfunded 40 Other Funding Sources' - $0 TOTAL SOURCES $2,270,495 $2,270,495 4495 4495 $354,000 $1,373,658 S542,342 $0 SO $2,270,495 1 Explain & Identify Type of Other Sources: Project Manager: Andrea Brinkley Project's Approval Date: 3/14/2012 24 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# ' PREFERENCE ORDER Shadow Creek Ranch Park Ph 1 PROJECT DESCRIPTION _ _ INCREMENTAL OPERATING AND MAINTENANCE COSTS cro3ecT elements includee eight lighted softball/basebal3Tields, one Impact on operating budget ❑NO ❑Yes(SeeBelow) soccer field, six volleyball courts, parking, a hike and bike trail around the fields and a lawn amphitheater for special events. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue S25,500 $25,500 S25,500 Personnel Services S232,128 $237,737� S243,478 operation and Maintenance S220,247 $234,647 S238,847 Capital Outlay S65,537 PROJECT JUSTIFICATION Total Expense S517,912 $472,384 $482,325 The Parks and Recreation Master Plan calls for a multipurpose sports FTE staff Total 50 complex in this area of the community to serve the anticipated growth Cost Avoidance/Payback pe riot Explanation: of the area. IMPACT ON'SERVICE LEVELS - FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report $37,051 $37,051 S37,051 437,051 I $37,051 Land/Right of way C SO Design/surveying $610,400 $610,400 $610,400 $610,400 $610,400 Construction S7,003,900 S7,003,900 S1,500,000 S5,503,900 $7,003,900 Equipment and Furniture S0 Contingency $763,700 S763,700 S812 $812 $199,188 S563,700 S763,700 TOTAL COSTS $8,415,051 S8,415,051 $648,263 $648,263 S1,699,188 S6,067,600 S0 SO 1 SO S8,415,051 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash So Certificates of Obligation $37,051 $37,051 $37,051 $37,051 $37,051 Future GO Bonds $8,360,000 S8,360,000 S67,511 467,511 S2,224,889 S3,950,766 $2,116,834 S8,360,000 w/S Revenue Bonds _ SO P.E.D.C. SO system Revenues - Cash SO Impact Fees SD unfunded SO Other Funding Sources' - S18,000 $18,000 $18,000 $18,000 S18,000 TOTAL SOURCES $8,415,051 $8,415,051 $122,562 - $122,562 ' $2,224,889 $3,950,766 $2,116,834 $0 SO $8,415,051 I Explain & Identify Type of Other Sources: Park zone 1 Project Manager: Cara Davis Project's Approval Date: 3/14/2012 25 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT it PREFERENCE ORDER Trait connectivity P20006 / P50072 q PROJECT DESCRIPTION -a. INCREMENTAL.OPERATING AND MAINTENANCE COSTS Implement phases of tT Hike and Bike Master P'fan starting at Centennial Impact on operating budget �No OYes(SeeBelow) Park with a temporary connection from Centennial Park Splash to Magnolia ' - Rd. Trail Continues at the John Hargrove Environmental Complex, then to w. Fiscal Year 2013 2014 2015 2016 2017- _ Mary's Creek detention. Phase I trail has been completed. Phase II will Total Revenue connect Centennial Park to Independence Park and Phase III to FM 518. - - Personnel Services S43,946 S90,913 S96,116 S97y874 Operation and Maintenance 86.753 S7,946 S7,946 57,946 Capital Outlay PROJECT JUSTIFICATION _ __ _ Total Expense _ S50,699 898,859 S104,062 S105,820 The Parks and Recreation Plan that was adopted by Council in December nt FTE Staff Total J t0l 10I 1 2005 lists the hike and bike trails as the number one priority for Cost Avoidance/Payback period Explanation: acquisition and development. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report 418,825 118,825 418,825 518,825 S18,825 Land/Right of way $50,545 S50,545 S50,545 S50,545 S50,545 Design/surveying $588,170 $588,170 $213,170 $213,170 S125,000 1125,000 $125,000 S588,170 Construction S2,256,116 S2,256,116 S647,015 5656,116 $400,000 S600,000 S600,000 S2,256,116 Equipment and Furniture S21,933 S21,933 S21,933 S21,933 Contingency SO TOTAL COSTS S2,935,589 12,935,589 S929,555 S960,589 SS25,000 S0 $725,000 S0 S725,000 S2,935,589 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012' 2013 2014 2015 2016 2017 TOTAL General Revenue - cash $1,150,000 S1,150,000 S625,000 S625,000 S525,000 S1,150,000 Certificates of obligation 51,068,825 S1,068,825 S18,825 S18,825 $525,000 S525,000 $1,068,825 Future GO Bonds S183,000 S183,000 S183,000 $183,000 $183,000 w/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees S0 Unfunded $O Other Funding Sources' - $533,764 S533,764 $102,730 $133,764 S200,000 $200,000 S533,764 TOTAL SOURCES S2,935,589 $2,935,589 4929,555 $960,589 S525,000 50 S725,000 SO S725,000 $2,935,589 1 Explain & Identify Type of Other Sources: Texas Parks and wildlife Trails Grant Funding-$200,000 a year, $100,000 in 2008. Project Manager: Cara Davis Expenditures will be limited to funding available. 'Additional funding needed in 2012, from Fund 50 fund balance. Project's Approval Date: 3/14/2012 26 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME _PROJECT.1___ - _ PREFERENCE ORDER___� Independence Park Ph 1 P20001 5 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Phase I-Idprovements lncinclude a reorientation of rife entry into the park, relocation andImpact on operating bud et Elmo ❑Yes(See Below) me upgrade of the existing playground, improvements to the existing pavilion, the construction of additional parking, an amphitheater for special events and landscaping. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services Operation and MaintenancE Capital Outlay PROJECT JUSTIFICATION Total Expense independence p is one 71 ion cand mosi ecogn master s Th t the Cary owns.FTE Staff TOtdl According to the park utilization survey conducted with the master plan, this park had the second highest utilization of all city parks. Most of the current amenities at the park Cost Avoidance/Payback period Explanation: are outdated or in bad condition and are in need of replacement. The Master Plan lists improvements to this park as a high priority. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report 429,437 $29,437 $29,437 129,437 $29,437 Land/Right of Way S0 Design/surveying S240,000 $240,000 $179,810 $60,190 4240,000 Construction 42,778,000 S2,778,000 $1,816,613 $961,387 S2,778,000 Equipment and Furniture SO Contingency 4300,000 S300,000 S30,000 4270,000 S300,000 TOTAL COSTS S3,347,437 S3,347,437 S29,437 S29,437 $0 S0 $179,810 S1,906,803 S1,231,387 $3,347,437 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SD Certificates of Obligation S29,437 $29,437 429,437 $29,437 429,437 Future GO Bonds S3,270,000 S3,270,000 $131,810 S1,291,201 S1,846,989 $3,270,000 W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees SO unfunded $0 Other Funding sources' - S48,000 448,000 448,000 S48,000 TOTAL SOURCES S3,347,437 S3,347,437 S29,437 S29,437 SO SO S179,810 S1,291,201 S1,846,989 $3,347,437 1 Explain & Identify Type of Other Sources: From Zone 11 Project Manager: Andrea Brinkley Project's Approval Date: 3/14/2012 27 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT if PREFERENCE ORDER Delores Fenwick Nature Center-Ph 1 P20004 6 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS The project wiTT__include a 7,000sq ft LEED Platinum Certified building with an open Impact on operating bud et ❑'No ❑Yes(See Bek/w) air pavilion at one end that would include: environmental educational displays, demonstration gardens, interpretive exhibits, 6 or 7 offices, restrooms, outdoor spray Fiscal Year 2013 2014 2015 2016 2017 station and hose bibs, a classroom with a 50 seat capacity, 400 sq ft of storage. Phase ii includes 2 miles of 6 ft and 8 ft trails, being a combination of crushed Total Revenue granite and concrete in low lying areas, boardwalk, pedestrian bridge, fishing pier, picnic tables, benches, trash receptacles, drinking fountain, and a paddle craft Personnel Services launching area and grass Crete parking. Operation and Maintenan Capital Outlay PROJECT JUSTIFICATION - Total Expense -7,projectwould_give-47i7l- ve-Pearl and"a unique opportunity to showcase JNEC n as a learning opportunity FrF staff Total for I I for the entire community. children/adults would be able to c and take classes and learn about the environment o ment i a hands-on setting. This would be the office for the tnB staff. There is most Avoidance/Payback period Explanation: great need in the community to educate the public on the benefit of recycling, green space and trees. This would also provide an opportunity to showcase the entire concept of utilizing one site as multi purposing for parks, recreation, detention, education, recycling, and environmental park. IMPACT ON-SERVICE LEVELS -- - FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report S25,000 S25,000 125,000 S25,000 S25,000 Land/Right of way S0 Design/Surveying S158,000 S158,000 $158,000 $158,000 Construction 52,010,500 S2,010,500 S736,026 S1,274,474 S2,010,500 Equipment and Furniture SO Contingency $197,500 S197,500 $197,500 $197,500 TOTAL COSTS S2,391,000 S2,391,000 S25,000 S25,000 S0 SO $158,000 S736,026 S1,471,974 S2,391,000 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash S0 Certificates of Obligation S25,000 $25,000 $25,000 S25,000 S25,000 Future GO Bonds 52,366,000 82,366,000 S39,150 S486,523 $1,840,327 S2,366,000 w/5 Revenue Bonds SO P.E.D.C. S0 System Revenues - Cash SO Impact Fees SO Unfunded $0 Other Funding Sources' - SO TOTAL SOURCES S2,391,000 S2,391,000 S25,000 S25,000 S0 50 S39,150 S486,523 S1,840,327 S2,391,000 'Explain & Identify Type of Other Sources: Possible grant funding in the amount of $500,000 from HGAC. Project Manager: Jennifer Lee 28 Project's Approval Date: 3/14/2012 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT # "' PREFERENCE ORDER -,.. PER 1•or Future Bond Referendum PK1501 7 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Provide—Tindin—g Tor preliminary engineering on future projects yet to Impact on operating bud et ❑No ❑yes(See Below) be identified that would be funded with the City's next bond referendum. Preliminary engineering would tighten down scopes and Fiscal Year 2013 2014 2015 2016 _ 2017 provide for estimated construction dollars that would be needed to take Total Revenue a proposition to the voters. - - - - - -- ---- - Personnel Services operation and Maintenance Capital Outlay PROJECT JUSTIFICATION- Total Expense FTE Staff Total Cost Avoidance/ Payback period Explanation: _ _ FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report $500,000 8500,000 8500,000 $500,000 Land/Right of way $O Design/Surveying SO Construction 80 Equipment and Furniture $0 Contingency $O TOTAL COSTS S500,000 S500,000 SO SO 80 SO $500,000 SO SO $500,000 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash $0 Certificates of obligation 8500,000 $500,000 8500,000 $500,000 Future GO Bonds 80 w/S Revenue Bonds $O P.E.D.C. SO System Revenues - Cash $O Impact Fees $O Unfunded $0 Other Funding Sources' - $0 TOTAL SOURCES S500,000 4500,000 SO SO SO SO $500,000 SO SO S500,000 ' Explain & Identify Type of Other Sources: Project Manager: Projects Project's Approval Date: 3/14/2012 29 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER Sports Comp ex at Max Road Ph 2 PK1601 8 PROJECT DESCRIPTION _ INCREMENTAL OPERATING AND MAINTENANCE COSTS Proposed improvements include six international sized (11 vs.11) soccer Impact on operating budget E Ho ❑yes(See Bebw) fields, consession stand, playground and a covered area for gatherings. - - -- Approximately 1-3 fields will be lighted and the park will be located inside Fiscal Year 2013 2014 2015 2016 2017 of a detention facility. Total Revenue - _ Personnel Services Operation and Maintenance Capital Outlay PROJECT JUSTIFICATION Total Expense rhete its a significant need for game soccer fields and sporis—fi`lds ,n the Ctty. with thq�E Staff Total development of this facility Centennial Park will be able to be converted to a facility for youth softball that will allow the youth soccer program, youth softball program and the Cost AVOidanCe/Payback period Explanation: youth baseball program to expand as the population in the community increases. IMPACT Ch SERVICE LEVELS 411 FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report S97,000 597,000 597,000 S97,000 Land/Right of Way S0 Design/Surveying 4389,000 $389,000 5389,000 5389,000 Construction S3,238,000 43,238,000 S3,238,000 S3,238,000 Equipment and Furniture SO Contingency S486,000 S486,000 S486,000 S486,000 TOTAL COSTS S4,210,000 S4,210,000 SO SO SO SO S0 S486,000 S3,724,000 S4,210,000 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds SO W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees SO unfunded S4,210,000 S4,210,000 $486,000 $3,724,000 44,210,000 Other Funding Sources' - SO TOTAL SOURCES S4,210,000 S4,210.000 S0 S0 SO SO SO $486,000 S3,724,000 S4,210,000 ' Explain & Identify Type of Other Sources: Future Bond Referendum Project Manager: Andrea Brinkley Project's Approval Date: 3/14/2012 30 CITY OF PEARLAND, TEXAS 2013 — 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER ___ __ Shadow Creek Ranch Park Ph 2 PK1602 9 PROJECT DESCRIPTION - INCREMENTAL OPERATING AND MAINTENANCE COSTS Project elements inc ui—dr eight lighted baseball i-fields, one soccer Impact on operating budget ENo ❑Yes(See Below) field, twelve tennis courts, parking, a hike and bike trail around the fields, playground, restroom, concessions and shade structures. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue i_ _ __ a _ Personnel Services ■ Operation and Maintenance Capital Outlay P_ROJECTJUSTIFICATION '; _ _ Total Expense _ The Parks and Recreation Master Plan calls {Or a multipurpose sports FTE Staff Total I 1 complex in this area of the community to serve the anticipated growth Cost Avoidance/Payback period Exp I anation: of the area. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report S216,000 S216,000 S216,000 5216,000 Land/Right of Way SO Design/Surveying S862,000 $862,000 S862,000 S862,000 Construction 87,186,000 S7,186,000 S7,186,000 S7,186,000 Equipment and Furniture $0 Contingency S1,078,000 41,078,000 S1,078,000 S1,078,000 TOTAL COSTS S9,342,000 S9,342,000 S0 SO SO SO SO S1,078,000 S8,264,000 $9,342,000 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of Obligation $0 Future GO Bonds $0 W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees SO unfunded 89,342,000 $9,342,000 S1,078,000 S8,264,000 S9,342,000 Other Funding Sources' - $0 TOTAL SOURCES S9,342,000 S9,342,000 SO SO $0 $0 SO S1,078,000 S8,264,000 S9,342,000 ' Explain & Identify Type of Other Sources: Future Bond Referendum Project Manager: Cara Davis Project's Approval Date: 3/14/2012 31 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT # PREFERENCE ORDER Hunter Park PK1502 10 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Continue development of the park along Orange St. to include trails, EIN0 ElYes(SeeBelow) Impact on operating budget benches, gathering area, landscaping and/or a pavilion. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services Operation and Maintenance . $16,900 $17,900 $18,700 Capital Outlay PROJECT JUSTIFICATION Total Expense $16,900 $17,900 $18,700 Continue development or park as directed by Council goals. FTE Staff Total 1 1 1 1 cost Avoidance/Payback period Explanation: IMPACT ON SERVICE LEVELS FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report SO Land/Right of way SO Design/Surveying $80,000 $80,000 S80,000 $80,000 Construction $475,000 5475,000 $475,000 $475,000 Equipment and Furniture SO Contingency $47,500 $47,500 $47,500 $47,500 TOTAL COSTS 4602,500 $602,500 SO SO SO SO $602,500 $0 $0 $602,500 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash $0 Certificates of Obligation $492,031 $492,031 $492,031 $492,031 Future GO Bonds $0 W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees SO Unfunded $0 Other Funding Sources' - $110,469 $110,469 $110,469 $110,469 TOTAL SOURCES 5602,500 5602,500 $O $0 SO SO 4602,500 SO SO $602,500 1 Explain & Identify Type of Other Sources: Parks Donation Fund, out of Park zone 9 for $110,469. Project Manager: Michelle Smith Project's Approval Date: 3/14/2012 32 CITY OF PEARLAND 2013-2017 CAPITAL IMPROVEMENT PROGRAM FACILITIES Project No. Project Name 2013 2014 2015 2016 2017 TOTAL TR1204 Intelligent Traffic System 4,019,160 4,019,160 FA1302 Fire Station#3 Reconstruction 289,368 2,822,423 3,111,791 FA0905 Old Police Department Renovation 644,565 644,565 FA1401 Fire Station#1 312,100 3,260,000 3.572,100 FA0904 City Hall Complex Renovations 1,104,218 1,104,218 F20002 Tom Reid Library Expansion 3,663,400 3,663,400 FA1203 Hillhouse Road Annex PH 2 250,000 2,750,000 3,000,000 FA1601 Fire Station#2 432,100 3,260,000 3,692,100 TOTAL $ 4,953,093 $ 4,488,741 $ 9,673,400 $ 432,100 $ 3,260,000 $ 22,807,334 SOURCE OF FUNDS 2013 2014 2015 2016 2017 TOTAL General Revenue-Cash Certificates of Obligation 2,250,973 4,488,741 6,010,000 12,749,714 Future GO Bonds 882,600 2,780,800 3.663,400 W/S Revenue Bonds P.E.D.C. System Revenues-Cash Impact Fees-Cash Unfunded 432,100 3,260,000 3,692,100 Other Funding Sources 3,368.160 3,368,160 Less Projects Appropriated in Previous Year (666,040) TOTAL $ 5,619,133 $ 4,488,741 $ 6,892,600 $ 3,212,900 $ 3,260,000 $ 22,807,334 33 _ _�� s is Ai li • --.-';'ir.i' -L. ":. ' ', 7a../.;.:#;fr:.:'\''Tli-,:?-'7;:l.i.it„le'i":.;',. .— '..:' r:7,-f ' "-- ,.* ,''.. ,.,.. .,-.,„ .6...,,f. ..›- .:-...:,...,-...,•.'... '...:,:f;:-,.;ir , , ...., v., . ....„. , ,,_ _ :: _r;.,,.,, ,,,, ,, _,. . _ ..,,._.- .--..-- ,-„- -.-------• :,_-,..._ ,.., ,,P•'..'-' --- %,;/::11,;,',...r,,,,,f,`' ' (.." - -,-,s,4"-:'--," ' '-"" '..k.4,-4'1 s LR' / . - v>n .J: rw ... • _;.. Rai- x` .x .ns»u kTM 1 ,.- - C nif Ct % P`a , r P.. _ �JJ,'t i � w I1t ,i ; '� ;_ of ' r T .� F _ 7 +' 4,i x y • it p j K.. ye R �., j - 1 t • I "'1 ;:i Cif tf ;q � t. • £ar- ` S �f'. A City of Pearland o cn F.conyiea Ren.onovation xol. 0 reanwu na Arm. vHn000-m1s 0 ro-.sd.on.x:olo-xan • 1�] P (PmpaN Loutlon, 2013-20`• C,a O Fire Station•JR1econUZrvdwn 2012-2014 0 ,,,,t req Renovations 20s 101] C P;S na Onn'4x015 0 1 2 G (Propoaetl Loca ronJ • In gaol Tralfc system x010 Facilities GIs CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT N PREFERENCE ORDER I nteT igeet traffic system iR1204 1 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS The City has received federal congestion Mitigation Air Quality program (CMAQ)Impact on operating budget lj No ❑Yes(SeeSebw) funds through the Transportation Improvement Program (TIP) for major upgrades to the city's entire traffic signal system. This system was taken over from Fiscal Year 2013 2014 2015 2016 2017 TxDOT in 2011. The project will provide upgrades to controllers, cameras, and the systems communication system. This will provide an Intelligent Total Revenue _ Transportation System (ITS) which will allow a switch of the City's entire network of signals to real-time monitoring, control, adjustments, trouble Personnel Services shooting, and emergency response management from the Traffic Operations Center ' (TOC) at the Hillhouse Road Facility. operation and Maintenance Capital Outlay PROJECT.:JUSTIFICATION . *;1 0MAR.A4f;> - ,_.,=14',, ,iry u,.. _:... Total Expense . Tire signals that the City received from TxDOT wkile operational, do not have FTE Staff Total the capability of new signals that allow the timing to be adjusted in real- cost Avoidance/Payback period Explanation: time, resulting in reduced travel times. In addition, the communications network will allow many issues to be resolved from the TOC, which will reduce call-outs to re-set the signals. The receipt of CMAQ funds will pay for 80% of the project. .ERVICE LEVELS'.__` ll..,,. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report SO Land/Right of way $0 Design/Surveying $650,000 S650,000 $650,000 $650,000 construction $4,035,200 S4,035,200 S16,040 $4,019,160 $4,035,200 Equipment and Furniture SO Contingency SO TOTAL COSTS $4,685,200 $4,685,200 S0 $666,040 $4,019,160 $0 SO SO SO S4,685,200 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash $O Certificates of Obligation $1,457,040 S1,457,040 S1,457,040 S1,457,040 Future GO Bonds $O W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees SO Unfunded SO Other Funding Sources' - S3,228,160 $3,228,160 S3,228,160 S3,228,160 TOTAL SOURCES S4,685,200 $4,685,200 SO SO S4,685,200 $O SO SO SO S4,685,200 ' Explain & Identify Type of Other Sources: HGAC TIP Funds in the amount of 43,228,160 in 2013. 20%City match required Project Manager: Public works Project's Approval Date: 3/14/2012 35 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT * PREFERENCE ORDER' _ -�� ----------Reconstruction FA1302 � PROJECT.DESCRIPTION - INCREMENTAL OPERATING AND MAINTENANCE COSTS Construction of approximately 10,000 sq-ft. station to house personnel Impact on operating budget ❑No EDYes(SeeBelow) from Fire and EMS, including dorm space, kitchen and dining area, day room, offices and exercise room. Also included are three double-deep Fiscal Year 2013 2014 2015 2016 2017 apparatus bays, gear storage, medical supplies storage, electrical room,Total Revenue work room, and hose storage. - Personnel Services - $324,170 $440,871 $449,688 $458,682 Operation and Maintenance 580,007 $102,476 $103,976 $102,476 Capital Outlay PROJECT JUSTIFICATION Total Expense $404,177 $543,347 $553,664 $561,158 Rebuild / Relocate FI rE StatThn 3 to aCCommOaate 24 fiour operation an. Finclude EMS housing. Cos C Staff Total I I 6.0I Cost Avoidance/Payback period Explanation: Assumes additional volunteer staffing of three I ' „i, N d M I@ ., mwIIIIIN FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report $45,000 $45,000 $5,500 $39,500 $45,000 Land/Right of way $25,000 $25,000 $25,000 S25,000 Design/Surveying $224,868 4224,868 S224,868 $224,868 Construction $2,293,686 $2,293,686 $2,293,686 S2,293,686 Equipment and Furniture S70,000 S70,000 $70,000 $70,000 Contingency $458,737 S458,737 $458,737 $458,737 TOTAL COSTS $3,117,291 $3,117,291 S0 45,500 $289,368 S2,822,423 $0 $0 $0 $3,117,291 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 201$ 2016 2017 TOTAL General Revenue - Cash $0 Certificates of Obligation $3,111,791 $3,111,791 $289,368 S2,822,423 $3,111,791 Future GO Bonds $0 w/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash S0 Impact Fees SO Unfunded SO Other Funding Sources' - $5,500 $5,500 $5,500 $5,500 TOTAL SOURCES $3,117,291 43,117,291 $0 $5,500 $289,368 S2,822,423 40 SO $0 $3,117,291 ' Explain & Identify Type of Other Sources: Project Manager: Jennifer Lee Project's Approval Date: 3/14/2012 36 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT S -PREFERENCE ORDER_ Old Pohice Department Renovation FAO905 3 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Renovations to the old PD euilding to accommodate relocating several Impact on operating budget ❑No El (See Below) departments from existing city facilities. May include adding windows, new furniture, remodeling lobby/receptionist area, additional parking and Fiscal Year 2013 2014 2015 2016 2017 landscaping. Includes CAT 6 wiring and upgrade to phone switches for VOIP.Total Revenue After an evaluation of the facility, HVAC replacement, plumbing code, and electrical code improvements were added. Departments that will relocate to personnel Services $35,391 S36,099 $36,821 437,557 this facility are Fire/EMS Admin and Fire Marshal. Operation and Maintenance $50,601 $51,127 $51,663 452,210 capital Outlay PROJECT JUSTIFICATION _ cty' Total Expense 485,992 $87,226 488,484 S89,768 To pov ride de aquate personnel- space toaccom modate the cs gEli._row To FTE Staff Total 1 J 1.01 1 reuse the space the building needs to be brought up to current Unified Cost Avoidance/Payback pen o Explanation: Development Code (UDC) and Code requirements. Scope amended to include renovation of the entire facility. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION ESTIMATED THRU TOTAL BUDGET CITY APPROP. FUNDED BUDGET 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report SO Land/Right of Way _ SO Design/Surveying S186,882 $186,882 $186,882 S186,882 $186,882 Construction S1,806,553 $1,806,553 $1,421,988 S1,421,988 $384,565 S1,806,553 Equipment and Furniture $230,000 $230,000 , $230,000 $230,000 • Contingency $30,000 $30,000 S30,000 S30,000 TOTAL COSTS S2,253,435 $2,253,435 S1,608,870 $1,608,870 S644,565 SO SO $0 S0 S2,253,435 FUNDING SOURCES ESTIMATED THRU TOTAL BUDGET CITY APPROP. FUNDED BUDGET 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of Obligation $504,565 S504,565 S504,565 S504,565 Future GO Bonds S0 W/S Revenue Bonds SO P.E.D.C. S0 System Revenues - Cash $0 Impact Fees S0 Unfunded SO other Funding Sources' - $1,748,870 S1,748,870 $1,608,870 $1,608,870 S140,000 S1,748,870 TOTAL SOURCES S2,253,435 $2,253,435 S1,608,870 S1,608,870 S644,565 S0 SO S0 SO S2,253,435 1 Explain &Identify Type of other Sources: Project Manager: Jennifer Lee Fund 201 Fund Balance-Interest Income earned on the bonds &savings on Public Safety Facility. 37 Project's Approval Date: 3/14/2012 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME - PROJECT# PREFERENCE.ORDER Fire Station 1 FA1401 - ---���-- --- —� ---""""—"-- '"—""'"- '4 PROJECT,DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Construction of approximately 10,000 sq-ft. station to house personnel Impact on operating budget ❑No ❑Yes(see Bebw) from Fire and EMS, including dorm space, kitchen and dining area, day room, offices and exercise room. Also included are three, double-Fiscal Year 2013 2014 2015 2016 2017 deep, apparatus bays, gear storage, medical supplies storage,Total Revenue electrical room, work room, and hose storage. site will potentially accommodate a future Fire and EMS Admin facility. Personnel Services Operation and Maintenance $36,597 $73,194 Capital Outlay PROJECT JUSTIFICATION _ __ _ Total Expense _ _ 436,597 $73,194 Re�ace a 44 year old station at tio a locan that will i mprove response FTE Staff Total times. In addition, the new station will better accommodate a 24-hour cost Avoidance/Payback period Explanation: operation and will add EMS housing. IMPACT ON SERVICE'LEVELS - FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET 'THRU 2012 2013 2014 2015 2016 2017 TOTAL Prelim. Engineering Report $52,100 $52,100 $52,100 $52,100 Land/Right of Way $O Design/Surveying $260,000 S260,000 S260,000 $260,000 Construction $2,655,000 $2,655,000 $2,655,000 $2,655,000 Equipment and Furniture $75,000 $75,000 $75,000 $75,000 Contingency $530,000 $530,000 $530,000 $530,000 TOTAL COSTS $3,572,100 $3,572,100 $0 40 SO $312,100 S3,260,000 SO 40 S3,572,100 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash $O Certificates of Obligation 43,572,100 $3,572,100 4312,100 $3,260,000 43,572,100 Future GO Bonds 40 W/S Revenue Bonds S0 P.E.D.C. $0 System Revenues - Cash $0 Impact Fees $0 Unfunded $0 other Funding Sources' - 40 TOTAL SOURCES $3,572,100 S3,572,100 S0 $0 SO $312,100 S3,260,000 $0 $0 $3,572,100 ' Explain & Identify Type of Other Sources: Project Manager: Jennifer Lee Project's Approval Date: 3/14/2012 38 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME ___A____PROJECT# _ PREFERENCE ORDER City Hal-T Complex Renovations FA0904 5 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS The City Halt 1st & 3rd Floor renovation w1TT- include moving interior Impact on operating budget ❑No ❑Yes(See Below) walls, painting, and replacing carpet. Some HVAC duct work and plumbing work will also be necessary. The Community Center renovation will consist Fiscal Year 2013 2014 2015 2016 2017 of HVAC replacement, possibly using the existing windows above the drop ceiling, moving exterior walls, painting, and carpet replacement. The 1st Ta tal Revenue floor of City Hall will be modified to accommodate the needs of utility personnel Services Billing and IT. Operation and Maintenance Capital outlay PROJECT JUSTIFICATION_ Total Expense - To provide adequate personne�r"ace to accommo as to—tTe Clty�s prowt�i. FTE Staff Total ,, Scope amended to include HVAC replacement in the Community Center due to anCost Avoidance/Payback period Explanation: aging, inefficient system. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report SO Land/Right of Way SO Design/Surveying $150,000 $150,000 S150,000 $150,000 Construction S965,000 S965,000 $85,000 $30,782 S934,218 S965,000 Equipment and Furniture S20,000 $20,000 S20,000 $20,000 Contingency SO TOTAL COSTS $1,135,000 S1,135,000 $85,000 $30,782 SO S1,104,218 S0 SO SO $1,135,000 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash $0 Certificates of Obligation $1,104,218 $1,104,218 S1,104,218 S1,104,218 Future GO Bonds SO W/S Revenue Bonds S0 P.E.D.C. SO System Revenues - Cash _ SO Impact Fees SO unfunded SO other Funding Sources' - $30,782 $30,782 585,000 530,782 S30,782 TOTAL SOURCES $1,135,000 $1,135,000 185,000 $30,782 SO $1,104,218 SO S0 SO S1,135,000 ' Explain & Identify Type of other Sources: Project Manager: Jennifer Lee Remaining Fund balance, Fund 50. City Hall S215,000; Community Center $920,000 Project's Approval Date: 3/14/2012 39 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT:# PREFERENCE ORDER Tom Reid Library Expansion F20002 g PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS 7lie Ti bra ry expansion wiTTincrease the now 20,584 s bui rdi ng by 11,542 sf Impact on operating budget ❑No E ves(See Bebw) for an overall floor plan area of 32,126 sf. This expansion will create new areas in the library such as a bookstore, children's story time room, teen Fiscal Year 2013 2014 2015 2016 2017 zone, computer labs and additional office/storage space. Renovations and Total Revenue enlargements of existing areas such as the circulation desk and book stack are also included. Personnel Services Operation and Maintenance _ 539,640 879,280 Capital outlay PROJECT JUSTIFICATION Total Expense S39,640 879,280 _ 7Tie sigoilcant grovitTi o Pearand-bas created a need for a-arger irddren`s FTE Staff Total area and adult meeting room to conduct activities, more stack area for books, and improved computer access. Cost Avoidance/ Payback period Explanation: 1111.11111111111111111.11 FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Prelim. Engineering Report $35,260 $35,260 $35,260 $35,260 $35,260 Land/Right of way SO Design/surveying $230,400 $230,400 $230,400 S230,400 Construction $3,145,000 $3,145,000 $3,145,000 $3,145,000 Equipment and Furniture SO Contingency $288,000 $288,000 $288,000 4288,000 TOTAL COSTS S3,698,660 S3,698,660 435,260 $35,260 $0 SO S3,663,400 $0 $0 43,698,660 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET. THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of Obligation $35,260 $35,260 $35,260 $35,260 435,260 Future GO Bonds S3,663,400 S3,663,400 S882,600 $2,780,800 $3,663,400 w/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees So Unfunded SO Other Funding Sources' - $0 TOTAL SOURCES $3,698,660 $3,698,660 $35,260 $35,260 SO SO S882,600 $2,780,800 S0 $3,698,660 ' Explain &Identify Type of other sources: Project Manager: Cara Davis Project's Approval Date: 3/14/2012 40 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT I PREFERENCE ORDER __—__— _—_ __—______ _____�______________—_____�--______ FA1203—_—_—____ __—_—__� -- H 1TTFiouse Road Annex Phase 2 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Phase II wiTTTeTuTTT defined after aeTOpment oT a business plan and Impact on operating budget O No Eves(See Below) approval by City Council. Conceptually, Phase II includes a Fleet Maintenance facility, wash bay, and material storage bins. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services operation and Maintenance Capital outlay PAOJEC1A3USTTFI,CCTION:..' Total Expense ._ _ Property was condemned in 2004 for a city facility. This work will make'.TE Staff Total I f 1 l best use of the property while reducing time spent by employees in Cost Avoidance/ Payback pen o Explanation: traveling to the service center for fuel, lockers, and equipment. FY201, Funds will fund a study to look at both the Hillhouse and Orange Street Public Works sites and determine future use of those sites. The study will take into consideration the potential future relocation of the EMS Administration, Fire Marshall Offices, and Fire Station 1. IIIIIMIIMM FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION ESTIMATED THRU PROJECT TOTAL BUDGET CITY APPROP. FUNDED BUDGET 2012 2013 2014 2015 2016 2017 TOTAL Prelim. Engineering Report 435,000 $35,000 S35,000 435,000 S35,000 Land/Right of Way S0 Design/Surveying S250,000 $250,000 S250,000 S250,000 Construction S2,450,000 S2,450,000 12,450,000 S2,450,000 Equipment and Furniture S300,000 S300,000 1300,000 S300,000 Contingency S0 TOTAL COSTS S3,035,000 S3,035,000 S35,000 S35,000 SO S250,000 S2,750,000 SO $0 S3,035,000 FUNDING SOURCES ESTIMATED THRU PROJECT TOTAL BUDGET CITY APPROP. FUNDED BUDGET 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO certificates of Obligation S3,000,000 43,000,000 S250,000 S2,750,000 $3,000,000 Future GO Bonds SO W/S Revenue Bonds S0 P.E.D.C. S0 System Revenues - Cash S0 Impact Fees SO Unfunded SO Other Funding Sources' - S35,000 435,000 435,000 S35,000 S35,000 TOTAL SOURCES S3,035,000 13,035,000 S35,000 S35,000 SO S250,000 S2,750,000 S0 S0 S3,035,000 1 Explain &Identify Type of other Sources: Project Manager: Skipper Jones 41 Project's Approval Date: 3/14/2012 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE.ORDER ____________ _________________._____________ 8 _________________________________________________ Fl re Station 2 FA1601 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS const7uctio7-o7 approximately 10,000 sq-ft. station to house personnel Impact on operating budget ]No ❑Yes(See Below) from Fire and EMS, including dorm space, kitchen and dining area, day room, offices and exercise room. Also included are three, double-deep,Fiscal Year 2013 2014 2015 2016 2017 apparatus bays, gear storage, medical supplies storage, electrical room,Total Revenue work room, and hose storage. Personnel services _ Operation and Maintenance Capital Outlay PROJECT_JUSTIFICATION _ ____ __ _ Total Expense _ Rebuild/Relocate Fire—Station 2 to accommodate a 24-hour operation and FTE Staff Total include EMS housing. This existing fire station is almost 40 years-old.Cost Avoidance/ Payback period Exp anation: The location of the facility will help maintain response time and distances. There is no space for crews to stand-by for short-term when other stations are responding to calls or for an extended period during a storm. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Prelim. Engineering Report $52,100 S52,100 S52,100 S52,100 Land/Right of Way S120,000 1120,000 $120,000 $120,000 Design/Surveying $260,000 $260,000 S260,000 $260,000 Construction $2,655,000 S2,655,000 $2,655,000 $2,655,000 Equipment and Furniture $75,000 $75,000 $75,000 $75,000 Contingency S530,000 S530,000 $530,000 $530,000 TOTAL COSTS S3,692,100 $3,692,100 SO S0 $0 $0 S0 S432,100 S3,260,000 S3,692,100 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash _ $0 Certificates of obligation S0� Future GO Bonds $0 W/S Revenue Bonds $0 P.E.D.C. SO System Revenues - Cash S0 Impact Fees S0 Unfunded S3,692,100 $3,692,100 S432,100 S3,260,000 S3,692,100 Other Funding Sources' - S0 TOTAL SOURCES S3,692,100 S3,692,100 S0 SO SO $0 $0 $432,100 $3,260,000 $3,692,100 1 Explain &Identify Type of other Sources: In future bond referendum. Project Manager: skipper Jones Project's Approval Date: 3/14/2012 42 CITY OF PEARLAND 2013-2017 CAPITAL IMPROVEMENT PROGRAM STREETS ��i � a a i a"` ati ��h'�k i1��1'�t :; °.�` I Pro FToopt �T, �� ►rbe Figmeoloo Afid' �k ,2014 2015 - 2016 2017 'TOTAL°ei,'PI ; TR0811 Business Center Drive 3,807,729 3,807,729 TR1203 Pearland Parkway Extension 1,455,192 1,455,192 TR1202 Fite Road 3,700,000 3,700,000 TR1205 Max Road 5,418,958 5,418,958 TR1303 CR 94 Expansion 1,145,471 3,839,019 4,984,490 TR1402 Regency Park Subdivision Paving 245,161 2,766,600 3,011,761 T08002 Bailey Road-Veterans to FM 1128 6,400,000 10,393,000 5,800,423 22,593,423 T20002 Old Alvin Rd Widening(Plum Street to McHard Road) 400,000 1,094,500 4,600,000 1,532,500 7,627,000 TR0803 Old Town Area Sidewalks 200,000 200,000 100,000 500,000 TR1201 CR 403(Hughes Ranch Road) 1,065,000 4,172,600 16,690,400 21,928,000 TR1501 PER for Future Bond Referendum 500,000 500,000 TR0601 Mykawa Road Widening(BW8 to FM 518) 2,707,318 10,262,032 9,255,650 22,225,000 TR1601 McHard Road Extension(Mykawa Road to Cullen Parkway) 515,075 40,640,589 41,155,664 TR1602 Longwood Street Reconstruction 991,404 6,017,544 7,008,948 TR1603 Grand Boulevard Reconstruction 793,109 2,741,502 3,534,611 TR1401 Sidewalk Installation 302,718 230,098 397,297 294,501 1,224,614 TOTAL $ 6,808,392 $ 13,505,856 $ 14,963,516 $ 32,324,517 $ 83,073,109 $ 150,675,390 SOURCE OF FUNDS 2013 2014 2015 2016 2017 TOTAL General Revenue-Cash 200,000 100,000 300,000 Certificates of Obligation 700,000 700,000 Future GO Bonds 3,448,663 5,995,814 12,793,050 27,837,618 9,566,587 59,641,732 W/S Revenue Bonds P.E.D.C. 3,148,493 3,148,493 System Revenues-Cash Impact Fees-Cash Unfunded 302,718 230,098 2,696,875 74,996,546 78,226,237 Other Funding Sources 659,236 7,207,324 1,240,368 9,106,928 Less projects appropriated in previous year (448,000) TOTAL $ 7,256,392 $ 13,505,856 $ 14,963,516 $ 30,734,493 $ 84,663,133 $ 150,675,390 Note:The totals do not tie by year as the City anticipates appropriating funds for GO Bond projects in one year and then selling the bonds in the next year. 43 F yam. ,f *'4 z! ., L _ - ". T,. r.11.2,,,. .4' ,f."•', ....!" . -4'-'a' r• •-"'". ' -Virto..,--, .," 1: '.fal --.,-..-7-'7= le 4k - 4 ---. - :14T!: T .ate ,�.. wpe. +o-X 3' ,,.. ',.. _.n bY7"Y IIYIni yt' ' - I M H . • ..IN„\'.' 0.0'-RI.,5.41 51ftt n C-if."" Ili, I1� .jam' !� f 'Yt „ ' x� City of Pea rland _— ...»....ran,.a. •.n �,...,.,A,. - »n„ ..» n,.n,.»„ ®oe, w m,m„ �a.r.�w>n� 0 0.5 1 2013- 2017 CIP Milt, Streets ���.._,.....,.._ ._ ...�, „� �dA„ o "�-. �.m.a„ �. �_, __._z__.--__.�, _.. �(s CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME - PROJECT t _ __ PREFERENCE ORDER__ __ —_ Business center On ve iR0811 1 PROJECT DESCRIPTION T— INCREMENTAL OPERATING AND MAINTENANCE COSTS Two TdneS of Business center Dr v-e dxist Tro aTrea em B0darway to the southern Impact on operating budget No Yes(See BebW) Pearland Town Center entrance. The limits of this project include the remaining two lanes from Broadway to the southern entry of the Pearland Town Center and Fiscal Year 2013 2014 2015 2016 2017 four lanes from the southern Pearland entrance to CR59. The proposed cross Total Revenue section is concrete curb and gutter with sidewalks. The project will also include improvements to CR59 that will accommodate the increase in traffic. Personnel Services _ operation and Maintenance $6,304 S25,218 S25,218 $25,218 S25,218 Capital outlay PROJ CT Pearland JUSTIFICATION and7U7777J7o pron Center. E S vide a secondary thorough Fare to 71707ace tr57 near the FTtaffdTota/Payback period Explanation: 525,218 525,218 525,218� 525,218 cos IMPACTOR SERVICE LEVELS FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION ESTIMATED PROJECT _ TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineerinq Report S126,927 S126,927 S126,927 S126,927 $126,927 Land/Right of Way SO Design/Surveying S357,O45 S357,045 S357,045 S357,045 S357,045 construction S4,281,052 S4,281,052 S175,000 S864,823 S3,416,229 14,281,052 Equipment and Furniture SO Contingency $391,500 S391,500 S391,500 S391,500 TOTAL COSTS S5,156,524 S5,156,524 S658,972 S1,348,795' S3,807,729 SO SO S0 S0 S5,156,524 FUNDING SOURCES ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - cash SO certificates of obligation S0 Future GO Bonds $0 w/S Revenue Bonds S0 P.E.D.C. S3,275,420 S3,275,420 4126,927 $126,927 $3,148,493 S3,275,420 System Revenues - Cash $0 Impact Fees SO Unfunded SO other Funding Sources' S1,881,104 $1,881,104 S532,045 S1,221,868 S659,236 S1,881,104 TOTAL SOURCES $5,156,524 S5,156,524 S658,972 $1,348,795 $3,807,729 S0 $0 SO $0 $5,156,524 1 Explain & Identify Type of Other Sources: Developer funded via agreement (S357,O45) approved on 5/23/2011. Project Manager: Cara Davis PEDC to be reimbursed from future street assessments. Project's Approval Date: 3/14/2012 45 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCES ORDER PeaFland Parkway Extension TR1203 2 PROJECT DESCRIPTION_ _ INCREMENTAL OPERATING AND MAINTENANCE COSTS A new extension of_approximately 4,500 ft from 500'east of of"Ier Drive to Impact on operating budget `.No {,Yes(See Below) Dixie Farm Road, constructing a 4-lane, concrete, curb and gutter, divided roadway with raised medians and a bridge crossing at Cowart's Creek. Signals Fiscal Year 2013 2014 2015 2016 2017 at the intersections of Oiler Drive and Dixie Farm Road will be installed if Total Revenue warranted. Personnel services $16,334 $16,661 $16,994 Operation and Maintenance $18,627 $18,627 S18,627 Capital Outlay andn Thorough Beltway.are l thEventually,ich 1provide for Parkwaytru hic g ntonerJt Total Expense $34,962 535,288 S35,621 9 J g » Total Staff Total I J 1 1.DI the m Pearla c nnect afwi congestion relief tey cost Avoidance/Payback period Explanation: ne Bay Boulevard in Friendswood providing an alternate route to IH-45. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION ESTIMATED TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report $0 Land/Right of Way S1,412,000 41,412,000 $1,412,000 41,412,000 $1,412,000 Design/Surveying $828,000 $828,000 $828,000 $828,000 $828,000 Construction $7,275,960 $1,455,192 $1,455,192 S1,455,192 Equiement and Furniture SO Contingency SO TOTAL COSTS S9,515,960 53,695,192 $2,240,000 S2,240,000 S1,455,192 S0 SO SO S0 S3,695,192 FUNDING SOURCES ESTIMATED TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash $0 Certificates of Obligation SO Future GO Bonds S1,903,192 $1,903,192 $1,903,192 $1,903,192 W/S Revenue Bonds SO P.E.D.C. $0 System Revenues - Cash SO Impact Fees SO unfunded SO Other Funding Sources' - $7,612,768 S1,792,000 $1,792,000 S1,792,000 41,792,000 TOTAL SOURCES S9,515,960 $3,695,192 $1,792,000 $1,792,000 $1,903,192 S0 $0 SO SO $3,695,192 ' Explain &Identify Type of Other Sources: Fund 68 Fund Balance. Update numbers for sound studies in future. Project Manager: Andrea Brinkley Project's Approval Date: 3/14/2012 46 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT f 'i' PREFERENCE ORDER Fite Road TR1202 3 PROJECT.DESCRIPTION INCREMENTAL OPERATING AND.MAINTENANCEi,COSTS An extension of 71te Road approximately 2,500 meet east 73r McLean, run m"rig Impact on operating budget No - Yes(See Below) adjacent to Centennial Park, tying into Veterans Drive. The project includes four lanes, undivided, of concrete curb and gutter including storm Fiscal Year 2013 2014 2015 2016 2017 sewers, outfalls and detention, traffic signals and related items. Total Revenue Personnel Services operation and Maintenance $4,350 S4,850 $4,850 Capital Outlay PROJECT JUSTIFICATION - Total Expense S4,350 $4,850 $4,850 willlar ge extension reduce the amount oftrarfic that_is currently FIE Staff Total diverted to walnut street, which is primarily residential. The completio Cost Avoidance/ Payback period Explanation: of this segment will allow traffic to continue on Fite beyond its current termination point, which will improve transportation efficiency and safety. The roadway is heavily used as an alternative route to FM 518 and serves residential, commercial, and school traffic. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED THRU PROJECT TOTAL BUDGET CITY APPROP. BUDGET 2012 2013 2014 2015 , 2016 2017 TOTAL Preliminary Engineering Report 4200,000 5200.000 S200,000 $200,000 Land/Right of way SO Design/surveying $600,000 S600,000 S600,000 $600,000 Construction S3,593,305 S3,593,305 S3,593,305 S3,593,305 Equipment and Furniture S0 Contingency S106,695 $106,695 $106,695 4106,695 TOTAL COSTS S4,500,000 S4,500,000 50 1800,000 S0 13,700,000 S0 SO 50 S4,500,000 FUNDING SOURCES FUNDED ESTIMATED THRU PROJECT TOTAL BUDGET CITY APPROP. BUDGET 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash S0 Certificates of obligation SO Future GO Bonds S803,843 $803,843 S803,843 S803,843 W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees SO unfunded SO Other Funding Sources' - S3,696,157 S3,696,157 $800,000 S2,896,157 S3,696,157 TOTAL SOURCES S4,500,000 S4,500,000 SO S800,000 SO S3,700,000 SO SO S0 S4,500,000 1 Explain & Identify Type of Other Sources: HGAC TIP Funds in the amount of S3,536,157. 20%City match required Project Manager: Cara Davis 47 Project's Approval Date: 3/14/2012 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER Max Road --TR1205 4 PROJECT DESCRIPTION _ _ INCREMENTAL OPERATING AND MAINTENANCE COSTS widenMaxRoad f M rom theuture Hughes Ranch a3 ignment and connecting with Impact on operating budget No Yes(See Below) Reid Boulevard, just west of Food Town. The roadway will be four lanes, divided, with concrete curb and gutter, including storm sewers, outfalls Fiscal Year 2013 2014 2015 2016 2017 and detention, traffic signals and related items. Total Revenue Personnel Services operation and Maintenance $17,550 S20,325 420,325 capital outlay PROJECT JUSTIFICATION Total Expense $17,550 $20,325 $20,325 The city is developing a Sports Complex adjacent to the proposed project,FTE Staff Total increasing the demand for reliable access to the area. Improvements to Cost Avoidance/Payback period Explanation: this roadway will reduce maintenance, improve mobility, and increase public safety. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report $245,000 $245,000 $245,000 S245,000 Land/Right of way $500,000 4500,000 $500,000 $500,000 Design/Surveying $500,000 S500,000 $500,000 S500,000 Construction S4,462,455 $4,462,455 44,462,455 $4,462,455 Equipment and Furniture So Contingency $956,503 S956,503 $956,503 $956,503 TOTAL COSTS $6,663,956 S6,663,956 SO $1,245,000 $O S5,416,958 ' S0 SO SO S6,663,958 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash $0 Certificates of obligation SO Future GO Bonds $1,107,791 $1,107,791 81,107,791 S1,107,791 W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees $0 unfunded SO Other Funding Sources' - S5,556,167 $5,556,167 41,245,000 $4,311,167 S5,556,167 TOTAL SOURCES S6,663,958 S6,663,958 SO 41,245,000 SO S5,418,958 S0 SO SO S6,663,956 ' Explain & Identify Type of Other sources: HGAC TIP Funds in the amount of $5,160,494. 20%city match required Project Manager: Cara Davis 48 Project's Approval Date: 3/14/2012 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT # PREFERENCE ORDER Ca 94 Expansion (CR 403 to 2,040 ft North of Broadway) TR1303 5 PROJECT.DESCRIPTION _ _ _ INCREMENTAL OPERATING. AND MAINTENANCE COSTS Expansion CR 94/Smith Ranch Road from 2-lanes-off asphalt into 4 No Yes(See Below) lanes, divided, with raised medians, concrete curb and gutter,Impact on operating budget landscaping, and storm sewer. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services Operation and Maintenance S981 S10,981 $10,981 Capital Outlay PROJECT JUSTIFICATION -:- .t4 Total Expense S981 S10,981 S10,981 New dev7eTopment and-7-new�MetroJ Park-n-Ride have increased trafnic on FTE Staff Total I I,this roadway. A strong demand for better access to this area calls for Cost Avoidance/Payback period Explanation: the expansion of this roadway. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report 165,733 165,733 S65,733 S65,733 S65,733 Land/Right of Way S816,803 $816,803 4816,803 $816,803 $816,803 Design/Surveying S262,935 S262,935 S262,935 $262,935 S262,935 Construction S3,291,238 S3,291,238 S3,291,238 S3,291,238 S3,291,238 Equipment and Furniture SO Contingency S547,781 $547,781 5547,781 S547,781 S547,781 TOTAL COSTS S4,984,490 S4,984,490 $4,984,490 SO 51,145,471 53,839,019 $0 50 SO S4,984,490 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET TNRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - cash SO Certificates of Obligation SO Future GO Bonds $4,984,490 $4,984,490 S4,984,490 S1,145,471 S3,839,019 S4,984,490 W/S Revenue Bonds So P.E.D.C. SO System Revenues - Cash S0 Impact Fees SO Unfunded S0 Other Funding Sources' - SO TOTAL SOURCES S4,984,490 S4,984,490 S4,984,490 SO S1,145,471 S3,839,019 SO SO SO S4,984,490 ' Explain & Identify Type of other sources: Project Manager: TBD Project's Approval Dat,3/14/2012 49 CITY OF PEARLAND, TEXAS 2013 — 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER Regency Park subdivision Paving TR1402 6 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Repute aT concrete paving within Regency Park subdivision. InstaTT 4 Impact on operating budget _ No Yes(See Below) sidewalk throughout the subdivision where possible within the right of way. Also evaluate the existing drainage system within the subdivision Fiscal year 2013 2014 2015 2016 2017 • and replace inlets as needed. Total Revenue Personnel Services Operation and Maintenance Capital Outlay PROJECT JUSTIFICATION Total Expense Regency Paris the oldest concrete-paved su6divisTOn_fn_tFie City. In the FrE Staff Total last couple of years the pavement condition throughout the subdivision has Cost Avoidance/Payback period Explanation: become increasingly unacceptable. Because of the nature of the failures, it is not fiscally efficient to replace individual concrete slabs. IMPACT ON SERVICE LEVELS FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report S0 Land/Right of way 40 Design/Surveying $245,161 S245,161 $245,161 S245,161 construction S2,305,500 S2,305,500 S2,305,500 S2,305,500 Equiexnent and Furniture SO Contingency S461,100 4461,100 $461,100 S461,100 TOTAL COSTS $3,011,761 S3,011,761 S0 SO S0 S245,161 $2,766,600 SO S0 S3,011,761 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of obligation SO Future GO Bonds $3,011,761 $3,011,761 $245,161 S2,766,600 S3,011,761 W/S Revenue Bonds S0 P.E.D.C. S0 System Revenues - Cash SO Impact Fees So unfunded SO Other Funding Sources° - SO TOTAL SOURCES S3,011,761 13,011,761 SO S0 S0 1245,161 12,766,600 S0 SO S3,011,761 1 Explain&Identify Type of other Sources: Project Manager: Jennifer Lee Project's Approval Date: 3/14/2012 50 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME ___ _ _______PROJECT# __ _____________PREFERENCERD OER_____ 8 all ey Roadet Vera n5 to FM 1128 T08002 7 PROJECTDES-—CRI-PTIONt _ INCREMENTAL OPERATING AND MAINTENANCE COSTS Bailey__Ro- iw1TT—oe— lmp roved-_to a i•our:Tane concrete `curb and—gutter Impact on operating budget No Yes(SeeBebw) boulevard from approximately 1,000 feet west of FM 1128 to Veterans Drive, a distance of 2.76 miles. The drainage improvements will accommodate the Fiscal Year 2013 2014 2015 2016 2017 roadway after the Cowart Creek Diversion project and the roadside ditch Total Revenue regrades to the south have been completed. The project includes the full o --— ---- —--- build out of the Bailey Intersections. A study was undertaken to optimize Personnel Services the drainage costs between the Cowart Creek Diversion and the Bailey Road Operation and Maintenance project. The result was to upsize the box culverts in the Bailey project 0 p for S1.4M, which reduces the cost of the Cowart Creek Project by approximately $2.6M. This amount of funds will be transferred from the Drainage project. Capital Outlay PROJECT JUSTIFICATION Total Expense Four lane boulevard segment 771 —accommodate scfioo T—traffic ono—provide FTE Staff Total drainage improvements that will provide re-graded ditches that will drain t Cost Avoidance/ Payback period Explanation: the south and away from Bailey Road. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION ESTIMATED TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report S0 Land/Right of way S2,668,005 S2,529,005 $2,429,005 S2,668,005 S2,668,005 Design/Surveying S2,014,725 S2,014,725 S1,914,725 51,914,725 S100,000 S2,014,725 Construction S23,471,658 S23,610,658 S964,658 S1,064,658 46,300,000 S10,393,000 S5,714,000 S23,471,658 Equipment and Furniture S0 Contingency S86,423 $86,423 S86,423 S86,423 TOTAL COSTS S28,240,811 S28,240,811 S5,308,388 S-5,647,388 SO 50 S6,400,000 S10,393,000 S5,800,423 S28,240,811 FUNDING SOURCES ESTIMATED TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - cash SO Certificates of obligation SO Future Go Bonds S26,383,082 S26,383,082 S4,791,027 ' S5,030,027 S5,159,632 S10,393,000 S5,800,423 S26,383,082 w/S Revenue Bonds SO P.E.D.C. S0 System Revenues - Cash SO Impact Fees SO Unfunded S0 Other Funding Sources' - $1,857,729 S1,857,729 $517,361 S617,361 S1,240,368 S1,857,729 TOTAL SOURCES S28,240,811 $28,240,811 S5,308,388 - S5,647,388 SO 50 S6,400,000 S10,393,000 S5,800,423 $28,240,811 ' Explain &Identify Type of Other Sources: $1.4M of GO Drainage bonds from the Cowart Creek Diversion project will be used to upsize the box culvert in this project. This will result in decreasing the cost of the Cowart Project Manager: Cara Davis Creek Project by approximatly $2.6M. Project's Approval Date: 3/14/2012 51 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME _ __ PROJECT S` ' PREFERENCE ORDER OTd Arvin Rd Wi a-e m ng um(al Street to M aCH ra Roaa) 720002 8 PROJECT DESCRIPTION ct T _1. INCREMENTAL OPERATING AND MAINTENANCE COSTS Reconstruion o approxim ately 0 mire of_OTa_ Ra_from Plum St to Impact on operating budget No Yes(See Below) McHard Rd from a 2-lane asphalt to a 4-lane undivided curb and gutter roadway. East side from McHard to Knapp to have 6' sidewalks. Funds Fiscal Year 2013 2014 2015 2016 2017 allocated in 2013 will be used for drainage adjacent to the Old Alvin water Total Revenue line project . __ __ _____ _ - Personnel Services Operation and Maintenance 51,299 Capital Outlay PROJECT JUSTIFICATION _ Total Expense $1,299 Thesis proposeT roadway was part ortTie 2007 Bon�Reereni(um ana'will provide FTE Staff Total another north-south route between McHard Road and FM518. Cost Avoidance/ Payback period Explanation: FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION ESTIMATED TOTAL BUDGET CITY APPROP, FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report S261,189 4261,189 5261,189 S261,189 52t1,189 Land/Right of Way S550,000 S550,000 S550,000 S550,000 Design/Surveying S544,500 S544,500 $544,500 $544,500 Construction S5,807,000 S5,807,000 S400,000 S4,600,000 $807,000 55,807,000 Equipment and Furniture SO Contingency 5725,500 S725,500 S725,500 S725,500 TOTAL COSTS 57,888,189 S7,888,189 $261,189 S261,189 S400,000 SO 51,094,500 S4,600,000 S1,532,500 S7,888,189 FUNDING SOURCES ESTIMATED TOTAL BUDGET CITY APPROP. FUNDED BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash S0 Certificates of Obligation S261,189 $261,189 S261,189 S261,189 4261,189 Future GO Bonds S7,627,000 57,627,000 $400,000 $1,094,500 S3,009,986 S3,122,514 S7,627,000 W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees So Unfunded SO Other Funding Sources' - SO TOTAL SOURCES S7,888,189 17,888,189 $261,189 5261,189 S400,000 SO S1,094,500 S3,009,986 53,122,514 S7,888,189 ' Explain & Identify Type of Other Sources: Project Manager: Cara Davis Project's Approval Date: 3/14/2012 52 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT A' PREFERENCE ORDER oTn Town Area Sidewalks TP0803 9 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS EncTOse�ditches an TnstaTTsidewaTks iniTie 0Td TOWr areabetween HoustoTImpact on operating budget -;No __Yes(See Below) st. and Grand Ave., from FM 518 to Orange St. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue _ Personnel Services operation and Maintenance Capital Outlay PROJECT JUSTIFICATION Total Expense _ _ 7iaewaTks are pa'F T a constructed in coordinationw t'Ti the old Townsite FTE staff Total I I I Master Plan. In order to install sidewalks without acquiring additional cost Avoidance/ Payback period Explanation: right of way, the roadside ditches must be enclosed. There are currently no sidewalks in the Old Town area; the work described here includes work we expect to complete within the next five years. The Old Town Drainage Project in the northeast quadrant is complete. IMP FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED THRU TOTAL BUDGET CITY APPROP. BUDGET 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report SO Land/Right of Way SO Design/Surveying SO Construction S1,000,000 $1,000,000 $500,000 $500,000 $200,000 $200,000 S100,000 S1,000,000 Equiement and Furniture SO Contingency SO TOTAL COSTS S1,000,000 S1,000,000 $500,000 S500,000 80 SO S200,000 S200,000 5100,000 S1,000.000 FUNDING SOURCES FUNDED ESTIMATED THRU TOTAL BUDGET CITY APPROP. BUDGET 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash $500,000 S500,000 S200,000 S200,000 $200,000 S100,000 1500,000 Certificates of Obligation S200,000 S200,000 S200,000 $200,000 Future GO Bonds $0 W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees SO unfunded SO Other Funding Sources' - $300,000 S300,000 S300,000 $300,000 S300,000 TOTAL SOURCES S1,000,000 S1,000,000 SS00,000 S500,000 50 SO S200,000 S200,000 S100,000 $1,000,000 1 Explain &Identify Type of Other Sources: Funding from Fund Balance. Project Manager: Public Works m3 Project's Approval Date: 3/14/2012 CITY OF PEARLAND, TEXAS 2013 — 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT S PREFERENCE ORDER CR 403 Hu 5g e RanC RO as__ TR1201 10 PROJECT DESCRIPTION _ INCREMENTAL OPERATING AND MAINTENANCE COSTS RecOnstriaTOT O CR4p3 TFE _El-en to Smt th Ranch Road from 7-two Tne Impact on operating budget L;No Yes(See Below) asphalt open ditch roadway to a four lane concrete curb and gutter boulevard for a distance of 2 miles. Brazoria County will be completing Fiscal rear 2013 2014 2015 2016 2017 the design, environmental clearance, and relocating the utilities. The Total Revenue project includes approximately 13,000 LF of Noise Barrier. The City is.-- - — -responsible for acquiring the ROW per the interlocal agreement with personnel Services Brazoria County. Funds available in 2012 are currently being used for ' signal installation and reconstruction of the intersection of CR 403 andoperation and maintenance $3,352 $3,352 $3,352 $3,352 S6,430 CR 94. Capital Outlay PROJECT r�J--UUSTIFICATION ��11 r __ -i Total Expense S3,352 43,352 $3,352� 43,352 S6,430 The roaOWay will proviUe e-nfianced safety and-access to Dawson Higl school FTE Staff Total located on sullen Blvd. and enhance access to SH 288, in conformance with back Cost Avoidance Pa the City thoroughfare plan. Avoidance/Payback period Explanation: IMPACT ON SERVICE LEVELS FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report SO Land/Right of Way S1,065,000 S1,065,000 $1,065,000 $1,065,000 Design/surveying $116,000 $116,000 $16,000 S16,000 $100,000 S116,000 construction $20,805,000 S20,805,000 $342,000 $342,000 $3,772,600 $16,690,400 $20,805,000 Equipment and Furniture S0 Contingency $335,000 $335,000 $35,000 $35,000 $300,000 S335,000 TOTAL COSTS S22,321,000 S22,321,000 S393,000 1393,000 SO S0 S1,065,000 S4,172,600 S16,690,400 S22,321,000 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds S5,630,600 S5,630,600 $393,000 $393,000 S1,065,000 S4,172,600 $5,630,600 Ws Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees S0 unfunded $16,690,400 S16,690,400 $16,690,400 $16,690,400 other Funding Sources' - SO TOTAL SOURCES S22,321,000 S22,321,000 $393,000 S393,000 SO SO S1,065,000 S4,172,600 S16,690,400 S22,321,000 Explain & Identify Type of other Sources: City or County future bond referendum. Project Manager: Brazoria County Project's Approval Date: 3/14/2012 54 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT d PREFERENCE ORDER PER Or Future Bond Referendum TR1501 11 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS ProviTe_'funding 1"cr-p7-e7iminary—engineenng on TuturTprojects yet—to 6e Impact on operating budget No Yes(SeeBelo`') identified that would be funded with the City's next bond referendum. Preliminary engineering would tighten down scopes and provide for estimated Fiscal Year 2013 2014 2015 2016 2017 construction dollars that would be needed to take a proposition to the voters. Total Revenue Personnel Services Operation and Maintenance Capital Outlay PROJECT.,JUSTIFICATION Total Expense __.._..__ _—_____._____--__________ FTE Staff Total Cost Avoidance/Payback period Explanation: PACT..ON SERVICE LEVELS ',i,j, r 1',id�l . FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION TOTAL FUNDED ESTIMATED BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 201S 2016 2017 PROJECT TOTAL Preliminary Engineering Report 4500,000 5500,000 4500,000 S500,000 Land/Right of way SO Design/surveying SO Construction SO Equipment and Furniture SO Contingency SO TOTAL COSTS S500,000 S500,000 SO SO SO SO S500,000 SO SO SS00,000 FUNDING SOURCES TOTAL FUNDED ESTIMATED BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of obligation $500,000 S500,000 S500,000 S500,000 Future GO Bonds SO w/5 Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees SO unfunded SO other Funding Sources' - SO TOTAL SOURCES S500,000 S500,000 SO SO SO SO S500,000 SD SO S500,000 t Explain & Identify Type of Other Sources: New Projects-Future Bond Referendum. Project Manager: Projects Project's Approval Date: 3/14/2012 55 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME _ __ _ PROJECT_#____ — _ PREFERENCE ORDER _ _ _ __________ ___, Mykawa Road Wl ae I—ng (ew8 to FM 518) ---------------------------------- TR0601 ----------------- 12 PROJECT DESCRIPTION _ _ INCREMENTAL OPERATING AND MAINTENANCE COSTS Construct approximately_3 miles of 4-rane concrete curb and"gutter dive aed Impact on operating budget LJNo LJYeS(See Bebw) boulevard section roadway, including storm sewers, outfalls and detention, traffic signals and related items. A detailed Drainage Study,Fiscal Year 2013 2014 2015 2016 2017 Environmental Assessment, and 95% Construction Plans were created for the Total Revenue segment between BW8 and McHard Rd from a previous design effort. Personnel Services Operation and Maintenance Capital Outlay PRO]ECT•3USTIEICATIOtI,W - ,'',.'s-TotalExpense This proposed roadway is Inc u e in t e City s ong-term t oroug are plan FTE Staff Total I I 1 I I to alleviate traffic headed south from the Beltway 8 to FM 518. Cost Avoidance/Payback period Explanation: FY PROJECTED APPROPRIATIONS iiitPROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report 4108,723 4108,723 S108,723 4108,723 4108,723 Land/Right of Way $895,200 S895,200 S895,200 S895,200 Design/Surveying S1,812,118 S1,812,118 $1,812,118 S1,812,118 Construction S18,771,342 $18,771,342 $9,800,000 S8,971,342 S18,771,342 Equipment and Furniture S0 Contingency S746,340 $746,340 $462,032 $284,308 $746,340 TOTAL COSTS S22,333,723 S22,333,723 S108,723 5108,723 SO 50 S2,707,318 S10,262,032 S9,255,650 522,333,723 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash S0 certificates of Obligation $108,723 4108,723 S108,723 4108,723 $108,723 Future GO Bonds S13,613,000 S13,613,000 S2,707,318 S10,262,032 S643,650 S13,613,000 w/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees SO unfunded' 48,612,000 S8,612,000 $8,612,000 $8,612,000 other Funding Sources' - SO TOTAL SOURCES S22,333,723 S22,333,723 $108,723 S108,723 SO 50 $2,707,318 $10,262,032 S9,255,650 S22,333,723 1 Explain &Identify Type of Other Sources: o Potential PEDC funding. Project Manager: Cara Davis Project's Approval Date: 3/14/2012 56 CITY OF PEARLAND, TEXAS 2013 — 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT• PREFERENCE ORDER M CHara Road Extension 74 yk awa RoaT-to Cu l-Ten Parkway} TR 1601 13 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Anew extension oT-app ro xlmate'ry 3.5 mire-s---OT MCHa rcT Roa(f,—from Cu en Impact on operating budget No Yes(See Bebw) Parkway to Mykawa Road, constructing a 4-lane, concrete, curb and gutter, divided roadway with raised medians. Includes storm sewers, outfalls and Fiscal Year 2013 2014 2015 2016 2017 detention, traffic signals, sidewalks and related items. This project Total Revenue will be coordinated with the McHard Road Trunk Sewer extension. Personnel Services _ Operation and Maintenance Capital Outlay • PROJECT JUSTIFICATION Total Expense This project is in accordance w�T —the City s Ma5or Thoroughfare Plan to FiE Staff Total alleviate traffic on FM518 by providing an alternate east/west routes Cost Avoidance/Fayback period Explanation: between 5H288 and 5H35. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report 5515,075 5515,075 1515,075 $515,075 Land/Right of Way S3,855,469 S3,855,469 $3,855,469 13,855,469 Design/surveying $2,135,120 $2,135,120 S2,135,120 S2,135,120 construction $28,875,000 $28,875,000 $28,875,000 S28,875,000 Equipment and Furniture SO Contingency $5,775,000 $5,775,000 S5,775,000 15,775,000 TOTAL COSTS S41,155,664 S41,155,664 SO SO SO S0 SO 3515,075 $40,640,589 141,155,664 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds SO w/s Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees S0 unfunded 141,155,664 $41,155,664 S515,075 S40,640,589 S41,155,664 other Funding Sources' - SO TOTAL SOURCES S41,155,664 $41,155,664 SO SO SD SO SO S515,075 $40,640,589 , S41,155,664 1 Explain & Identify Type of Other Sources: Project Manager: Jennifer Lee Project's Approval Date: 3/14/2012 57 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME ___ PROJECT# .___ PREFERENCE ORDER __ _ _�_ r- ______—_________�__�____-__�__�___ T,—,___,_�___—___—__—_—__—___�_ Longwoo Street Reconstruction TR1602 14 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Replace existing Longwood Street from FM518 to Myrtlewood Dr. with minorlmpact on operating budget - No Yes(See Bebw) collector profile, concrete curb and gutter with storm sewer. Also remove and replace 12" and 8" asbestos concrete water lines. Add 4' sidewalk on Fiscal Year 2013 2014 2015 2016 2017 both sides of road. Also complete similar work on Paul Drive from Longwood Total Revenue to city limits and McDonald Drive from Dixie Farm Road to Longwood. Some pipeline relocations may be required. Personnel services operation and Maintenance _ _ Capital Outlay PROJECT JUSTIFICATION _ Total Expense __ _ _ n1T three of these streets are in the 7noroughrare Plan as minor collectors.FTE Staff Total The project is recommended at this time because of ongoing drainage issues.Cost Avoidance Pa The City of Friendswood is beginning construction on Melody Lane (which Avoidance/Payback period Explanation: becomes Paul at the city limits). The newly signalized intersection at McDonald and Dixie Farm Road has increased traffic on all three of these roads. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report S0 Land/Right of way $500,000 S500,000 $500,000 $500,000 Design/Surveying $491,404 S491,404 $491,404 S491,404 Construction S4,814,035 S4,814,035 $4,814,035 S4,814,035 Equipment and Furniture SO contingency S1,203,509 S1,203,509 S1,203,509 41,203,509 TOTAL COSTS S7,008,948 S7,008,948 SO SO SO SO SO $991,404 S6,017,544 S7,008,948 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of Obligation S0 Future GO Bonds SO W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees SO Unfunded S7,008,948 S2,008,948 4991,394 $6,017,554 S7,008,948 Other Funding Sources' - SO TOTAL SOURCES S7,008,948 S7,008,948 SO $0 SO SO SO $991,394 S6,017,554 S7,008,948 1 Explain & Identify Type of Other Sources: Comprehensive analysis to be done on concrete streets to create a plan to include in future bond referendum. Project Manager: Andrea Brinkley Project's Approval Date: 3/14/2012 Jo CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAMES PROJECT----- PREFERENCE ORDER._ O gi and tiTevarU Reconstruction 15 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Reconstruct approximately 1,300 feet or Grand Boulevard from Broadway to Impact on operating budget No Yes(See Below) walnut street from one lane each direction to a Boulevard with one lane each direction with angled parking. Fiscal year 2013 2014 2015 2016 2017 Total Revenue Personnel Services Operation and Maintenance 5168 Capital Outlay PROJECT JUSTIFICATION Total Expense 5168 Thirs-77oToo—FIT—Or—s—t7--ee77—wiri—i7—npre7nen—f—t137-goalT7r7d Meal-yes—of the 151-ci FTE Staff Total 1 Townsite Plan. This proposal Pearland Old Townsite. will be critical for the success of the City Cost Avoidance/Payback period Explanation: of 's IIMIIIII FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED THRU TOTAL BUDGET CITY APPROP. BUDGET 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report 597,703 497,703 $97,703 $97,703 Land/Right of Way 5500,000 5500,000 $500,000 5500,000 Design/Surveying $195,406 5195,406 3195,406 $195,406 Construction 52,228,561 52,228,561 2,228,561 52,228,561 Eguipaent and Furniture $O Contingency $512,941 $512,941 512,941 5512,941 TOTAL COSTS $3,534,611 53,534,611 SO SO SO $O SO $793,109 52,741,502 $3,534,611 FUNDING SOURCES FUNDED ESTIMATED THRU TOTAL BUDGET CITY APPROP. BUDGET 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash $O Certificates of Obligation SO Future GO Bonds . $O W/S Revenue Bonds _ $O P.E.D.C. $O System Revenues - Cash $O Impact Fees $O unfunded 53,534,611 $3,534,611 $793,109 S2,741,502 53,534,611 Other Funding Sources' - SO TOTAL SOURCES $3,534,611 $3,534,611 SO SO SO SO SO $793,109 32,741,502 $3,534,611 ' Explain & Identify Type of Other Sources: P.E.D.0 could fund costs associated with optional upgrades in lieu of standard specifications (street parking, Project Manager: Andrea Brinkley back of curb pavers, stamped concrete crosswalks, and decorative lights), subject to review and approval of the Board, S1,242,224. Project's Approval Date: 3/14/2012 59 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME _ PROJECT# PREFERENCE ORDER ew Sidalk Instal ration TR1401 16 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Install__sla ZT s near expected heavy-use areas such as schooTs, parks Impact on operating budget No Yes(See Below) and businesses where future CDBG funds are not available. we havo identified nine locations that we believe would provide benefit to the Fiscal Year 2013 2014 2015 2016 2017 city, for a total of 40,410 if of 4-ft-wide sidewalk. This project would • be accomplished over several years. some areas may also require drainage Total Revenue work to provide area for the sidewalk. Budget assumes $4.50/si - installation. Personnel Services - Operation and Maintenance _ Capital Outlay PROJECT JUSTIFICATION Total Expense FacitiCate the public access to schoo-Ts, parks & businesses sate Ty andFTE staff Total I I I I I encouraging reduced driving. Cost Avoidance/Payback period Explanation: IM ,�4► „ICE LEVELS w w s5740llr _ iai FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report $0 Land/Right of way $0 Design/Surveying $63,015 $63,015 $15,577 $11,840 420,444 415,154 - S63,016 Construction 41,050,270 41,050,270 S259,621 $197,340 $340,735 5252,574 $1,050,270 Equipment and Furniture SO Contingency $111,329 $111,329 S27,520 $20,918 S36,118 $26,772 $111,328 TOTAL COSTS $1,224,614 $1,224,614 $0 SO SO S302,718 1230,098 S397,297 S294,501 S1,224,614 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash $0 Certificates of obligation $0 Future GO Bonds $0 w/S Revenue Bonds $0 P.E.D.C. SO system Revenues - cash S0 Impact Fees SO unfunded 41,224,614 S1,224,614 8302,718 $230,098 $397,297 S294,501 S1,224,614 Other Funding Sources' - SO TOTAL SOURCES S1,224,614 S1,224,614 SO SO SO $302,716 $230,098 $397,297 S294,501 51,224,614 ' Explain &Identify Type of Other Sources: Safe route to schools grant currently not funded. If not funded by grant, could not proceed. Project Manager: TBD Yrl-Business Center or., Miller Ranch Rd., Southdown DR. & Lambert Dr. Yr2-O'Day Rd. Yr3-Hatfield Rd. Yr4-Hughes Ranch Rd Yr5-Hughes Ranch Rd., old Alvin Rd. 00 Project's Approval Date: 3/14/2012 CITY OF PEARLAND 2013-2017 CAPITAL IMPROVEMENT PROGRAM WATER Project No. Project Name 2013 2014 2015 2016 2017 TOTAL WA1001 General Engineering/CIP Administration 75,000 50,000 50,000 50,000 225,000 WA1201 McHard Rd.16"Waterline 629,857 4,294,371 4,924,228 Pearland Parkway Waterline from Shadycrest to Dixie WA1206 Farm Road 420,000 420,000 WA1301 Hughes Ranch Rd.8"Waterline 60,000 60,000 WA1401 Old City Hall Ground Storage Tank 125,000 125,000 WA1302 SH35 Waterline from FM518 to Magnolia 518,715 1,518,419 2,037,134 WA1303 CR 94 Waterline 200,090 773,310 973,400 WA1203 Fellows Loop 472,000 2,019,000 2,491,000 WA0812 Surface Water Plant 2,000,000 4,195,000 17,107,982 17,107,982 40,410,964 WA1501 FM 1128 16"Waterline 210,384 1,092,000 1,302,384 WA1502 CR 100 Waterline 463,450 2,371,210 2,834,660 Harkey Rd.from CR100 to CR128&CR 128 from WA1503 Harkey to Veterans 433,036 1,886,500 2,319,536 WA1504 Veterans Dr.Bailey Rd.to CR 128 16"Waterline 466,889 1,791,480 2,258,369 WA1505 FM 521 Waterline(Broadway to Mooring Pointer) 136,890 1,232,010 1,368,900 Grand Boulevard Waterline-Old Townsite Southeast WA1601 Quadrant 14,198 133,683 147,881 WA1701 Green Tee Rehabilitation 509,058 509,058 TOTAL $ 1,903,662 $ 9,233,100 $ 7,974,649 $ 25,545,380 $ 17,750,723 $ 62,407,514 SOURCE OF FUNDS 2013 2014 2015 2016 2017 ' "'TOTAL General Revenue-Cash Certificates of Obligation Future GO Bonds W/S Revenue Bonds 4,693,171 2,597,500 10,682,846 8,553,991 26,527,508 P.E.D.C. System Revenues-Cash 663,353 1,531,865 1,914,825 2,107,745 509,058 6,726,846 Impact Fees-Cash 1,240,309 386,655 301,889 1,928,853 Impact Fees-Debt 2,360,409 2,150,935 12,740,591 8,553,991 25,805,926 Unfunded 14,198 133,683 147,881 Other Funding Sources 261,000 1,009,500 1,270,500 TOTAL $ 1,903,662 $ 9,233,100 $ 7,974,649 $ 25,545,380 $ 17,750,723 $ 62,407,514 61 • L ' 4 ? xa'l iV** 41 '-': vYgi: r(s ,r',' a 1• — g 4i L,--. '�.1 1 .?. , i_ u 7_ 4 ; f. ,A vF o-. .. S ger rtsy4- y:—Q may} ''._ a;��a. v a '%. �ytt .yy ,, v it a sr _mow ,,.. WATER OP 2013-2017 � � REFERENCE NO. PROJECT NAME YEAR OF FUNDING , )� 6u,lau Water Phr2 2014201T t ' DU CIe FM Gram.Stomae* 2014 } Y } FM 1122 161 WM.. 201,2016 CR100Walerhn 201,2016 . • -' M:W,e Re 18'Waterhr 20112014 r '. W,Ia2 RI from CR100b CRIME CR 1ID kern y) WM1eyb Veteran 201,2016 VeS2l /RE-.CR 1281SNhhrir 20152016 . fM521 W.A.Wye lB,mhaFb Mlorhp Pal 20152016 (dd RIM Waerhn from RAMS to Meg We ID11201. t Pea..PbyWleM1r from 5MJ2cresl to � [[[[ Felons Farm Road 201] Febws UM/ 20143019 CR 9e Wale.. 2p13201a Grab Bmlerrd Wderir. 20162017 Na It. Tee Rehahial.n 2012 Ho Ranh Road 2.Wafer. 2013 ~� = r ail Cityof Pearland �-�a Wa� DY�Y6M MCO 6 126.a,sme 6VETERANS�N9«RP CRUD Ea„Em„m, FELLOWS P N a �. �I/ 16 2013—2017 CIP �,mFDdaE a�a,e �Rr62,aT aFR.FM51 TGhaaaNGFO61.a,4mb aw wDW.6R,NEA,4o„ 0:77::c.' a„ 005 21�66aewr6FUNF Faa Fu e,e*oNwea1.m,im,. o'D'"x0 - 0Miles Water ��RDaD,PW E�E91a,. �F�a OF n,F�NFe� .,Fe..aGE.. 0, ^�- CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT M ______-_ ___ ______ _____ PREFERENCE_ORDER.�._ ___ _________ _-__ n Ge e ra� n ngEngi nee / CID Admim stration WA1001 1 ----- - --- -------------- ----- - PROJECT DESCRIPTION _ _ INCREMENTAL OPERATING AND MAINTENANCE COSTS i' pro)ECtvla servics proes e necessary for the env re CIP aiO not project Impact on operating budget LdNo ❑Yes(See Bebw) specific but is specific to the water or wastewater projects. Thu Wastewater and Water Models will be updated and any special studies will be Fiscal Year 2013 2014 2015 2016 2017 completed as necessary. Total Revenue _. < Personnel Services Operation and Maintenance Capital Outlay PROJECT,JUSTIFICATION r Total Expense The Wastewater Model and water Monet were rastupdate�in�-2007 ana most oi`,TE Staff Total the high priority projects identifed at that time have been completed.Cost Avoidance/Payback period Explanation: Additionally the model updates will ensure that projects included in the CIP are based upon priority and the special studies will include cost estimates for the projects. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report _ SO Land/Right of way SO Design/surveying $537,000 $537,000 $312,000 4312,000 $75,000 S50,000 S50,000 $50,000 S537,000 Construction $0 Equipment and Furniture $150,000 5150,000 $150,000 S150,000 S150,000 Contingency SO TOTAL COSTS $687,000 $687,000 3462,000 $462,000 575,000 S50,000 $50,000 $50,000 $0 $687,000 FUNDING SOURCES TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - cash 50 Certificates of Obligation SO Future GO Bonds SO W/5 Revenue Bonds SO P.E.D.C. SO System Revenues - Cash S462,000 4462,000 $237,000 4237,000 575,000 $50,000 $50,000 S50,000 $462,000 Impact Fees - Cash $0 Impact Fees - Debt $0 - unfunded SO Other Funding Sources' - $225,000 S225,000 $225,000 $225,000 $225,000 TOTAL SOURCES $687,000 S687,000 $462,000 S462,000 475,000 S50,000 $50,000 S50,000 $0 S687,000 ' Explain &Identify Type of Other Sources: Funding for updates to the water and wastewater models. Project Manager: Teo Fund 301 Fund balance. Project's Approval Date: 3/14/2012 63 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT Y PREFERENCE ORDER NCHand Rd. 16" waterline W _ __ 2 A 1201 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Install approximately 34,000 feet of 16-inch water line along MCHard Rd.Impact on operating budget ❑N0 lYes(SeeBeIon) from S.H. 35 to Business Center Dr. and connect to the area currently served by the City of Houston Connection at FM521. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services operation and Maintenance ($187,500) ($750,000) ($750,000) (S750,000) Capital Outlay PROJECT JUSTIFICATION Total Expense ($187,500) (5750,000) ($750,000) ($750,000) This will be a second continuous connection between the east and west FTE Staff Total I 1 sides of the City. It will allow for more efficient water flow, better Cost Avoidance/Payback period Explanation: fire protection and the movement of water from the expanded Alice Street water Plant. The water purchased from the city of Houston connection at Alice street will reduce the cost of water purchased from Houston by approximately $750,000/year. IMPACT ON SERVICE LEVELS FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET_CITY APPROP. BUDGET THRU 2012 2013 2014 201S 2016 2017 TOTAL Preliminary Engineering Report $807,691 $807,691 $807,691 S807,691 4807,691 Land/Right of way S807,005 $807,005 $807,005 - $807,005 S807,005 Design/Surveying $322,960 S322,960 $322,960 S322,960 $322,960 construction $4,294,371 S4,294,371 S4,294,371 S4,294,371 Equipment and Furniture SO contingency $858,874 ' $858,874 $229,017 S229,017 S629,857 S858,874 TOTAL COSTS S7,090,901 S7,090,901 S2,166,673 S2,166,673 $629,857 $4,294,371 S0 SO S0 $7,090,901 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash S0 certificates of obligation S0 Future GO Bonds S0 w/S Revenue Bonds $5,318,176 S5,318,176 $1,625,005 $1,625,005 $3,693,171 S5,318,176 P.E.D.C. So System Revenues - Cash SO Impact Fees - cash $629,857 $629,857 $629,857 $629,857 Impact Fees - Debt $1,142,868 S1,142,868 $541,668 $541,668 S601,200 $1,142,868 Unfunded So other Funding sources'- SO TOTAL SOURCES S7,090,901 $7,090,901 $2,166,673 $2,166,673 $629,857 S4,294,371 SO SO S0 $7,090,901 'Explain & Identify Type of Other Sources: Project Manager: Jennifer Lee Project's Approval Date: 3/14/2012 64 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT # . PREFERENCE ORDER PROJECT Parkway Waterline from Shadycrest to Dixie Farm Road 3 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Yffi7;17-aTDID FaTifiFeTT-4755U-IT-----------water 1 i ne a o n 9 future Pea r rirld bud t n No 7 Yes(See Robe) Impact on eratin ge Parkway from Shadycrest to Dixie Farm Road. This project will be op g constructed in conjunction with the road extension project. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services Operation and maintenance Capital Outlay PROJECT JUSTIFICATION Total Expense This project will connect 10-7a1777171777-777777771713-747777T771777Ne FT i E staff Total 1 i , L l an additional water source to residential neighborhoods in the area. Assum, all survey and ROW funding from road project. cost Avoidance/Payback period Explanation: IMPACT ON SERVICE LEVELS 4111111iikP VW FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report S32,850 532,850 432,850 432,850 432,850 Land/Right of way SO Design/Surveying S49,250 $49,250 $49,250 $49,250 $49,250 construction $350,000 5350,000 5350,000 $350,000 Equipment and Furniture SO . . Contingency $70,000 $70,000 $70,000 $70,000 TOTAL COSTS $502,100 $502,100 $12,100 $82,100 S420,000 10 $O SO $O $502,100 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash So Certificates of Obligation SO Future GO Bonds $0 w/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash $251,050 $251,050 582,100 $82,100 $168,950 4251,050 Impact Fees - Cash 4251,050 4251,050 S251,050 $251,050 Impact Fees - Debt SO unfunded SO Other Funding Sources' - $O TOTAL SOURCES $502,100 $502,100 $82,100 $82,100 $420,000 $O SO SO $O $502,100 ' Explain & Identify Type of other sources: Project Manager: Andrea Brinkley Project's Approval Date: 3/14/2012 65 CITY OF PEARLAND, TEXAS 2013 — 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME _ ___ PROJECT PROJECT# PREFERENCE ORDER Hughes Ranch Rd 8" waterline wA1301 4 PROJECT..DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Installation Oran 8" -Ro m om Max Road to 1,000 feet west of_Max Impact on operating budget L No Lives(See Below) Road, along the future Hughes Ranch Road Extension. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services operation and Maintenance Capital Outlay PROJECT JUSTIFICATION _ _ Total Expense This waterline is neededin order to service the Max Road Sports Complex -- - - -- - - and future development in this area, which includes Avalon Terrace FTE Staff Total Sections 4 & 5. Cost Avoidance/Payback period Explanation: FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report SO Land/Right of Way SO Design/surveying SO Construction 460,000 S60,000 S60,000 S60,000 Equipment and Furniture 40 Contingency SO TOTAL COSTS S60,000 S60,000 SO S0 S60,000 SO S0 SO So S60,000 FUNDING SOURCES TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds SO w/S Revenue Bonds S0 P.E.D.C. SO System Revenues - Cash S60,000 460,000 S60,000 S60,000 Impact Fees - Cash SO Impact Fees - Debt SO Unfunded SO Other Funding Sources' - SO TOTAL SOURCES S60,000 S60,000 SO SO 460,000 SO SO S0 S0 S60,000 ' Explain & Identify Type of Other Sources: Project Manager: Andrea Brinkley Project's Approval Date:4/23/2012 66 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME ________ __—_____ OTd Ctty Hall Ground Storage Tank WA1401 5 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Abandonment—TT the Oid City Hall747-a FeT Well—and dismantling 7 the U No Ures(See BWow) existing ground storage tank. This will occur after the Old Alvin Impact on operating budget 20" Waterline is completed, which will provide water from the Alice Fiscal Year 2013 2014 2015 2016 2017 Street Plant in the areas currently fed by the Old City Hall plant.Total Revenue __ _ Personnel Services Operation and Maintenance Capital Outlay PROJECT JUSTIFICATION Total Expense The well and tank needdtto be decommissioned due to age and FTE Staff Total condition. Cost Avoidance/Payback period Explanation: FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report $0 Land/Right of Way $0 Design/Surveying $0 construction $125,000 4125,000 $125,000 4125,000 Equipment and Furniture $0 Contingency $0 TOTAL COSTS S125,000 $125,000 S0 SO SO 4125,000 S0 40 SO S125,000 FUNDING SOURCES TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - cash SO Certificates of Obligation $O Future GO Bonds S0 W/S Revenue Bonds SO P.E.D.C. SO System Revenues - cash $125,000 4125,000 S125,000 S12S,000 Impact Fees - cash $0 Impact Fees - Debt SO Unfunded SO Other Funding Sources' - SO TOTAL SOURCES $125,000 $125,000 $0 S0 $0 4125,000 S0 SO SO $125,000 ' Explain & Identify Type of Other Sources: Project Manager: Public Works Project's Approval Date: 3/14/2012 67 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME _ PROJECT# PREFERENCE ORDER SH 35 Waterline from FM518 to Magnolia WA1302 6 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Install approximately 1.5 mid es of 12" water line along SH35 from FM516 to Impact on operating budget ONo H Yes(See Bebw) just south of Magnolia/John Lizer. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services operation and Maintenance Capital outlay • PROJECT JUSTIFICATION Total Exeense The existing water -fine its undersized at 6"and 8" and segments are FTE Staff Total asbestos concrete (AC). The new line will connect 16" lines to the north Cost Avoidance/ Payback period Explanation: and south and will avoid the possibility of brittle AC lines underneath future pavement. IMP 0.. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report S56,240 556,240 456,240 $56,240 Land/Right of way $350,000 4350,000 $350,000 5350,000 Design/Surveying $112,475 S112,475 S112,475 S112,475 Construction $1,237,230 S1,237,230 S1,237,230 S1,237,230 Equipment and Furniture SO Contingency $281,189 $281,189 $281,189 S281,189 TOTAL COSTS $2,037,134 S2,037,134 S0 S0 5518,715 S1,518,419 SO SD S0 S2,037,134 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash $0 Certificates of Obligation SO Future GO Bonds SO W/S Revenue Bonds $0 P.E.D.C. S0 System Revenues - Cash 51,018,568 $1,018,568 S259,358 $759,210 $1,018,568 Impact Fees - Cash 4259,357 5259,357 S259,357 S259,357 Impact Fees - Debt $759,209 $759,209 $759,209 S759,209 unfunded $0 Other Funding Sources' - SO TOTAL SOURCES S2,037,134 52,037,134 S0 S0 S518,715 S1,518,419 S0 S0 SO S2,037,134 ' Explain & Identify Type of Other Sources: Project Manager: Cara Davis Project's Approval Date 3/14/2012 68 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT I __ PREFERENCE ORDER 7 CR 94 Wa_te��i ne PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS Instates approximate ry 5,300 7eet o-r-fr waterline mom Hughes Ranch Ra7CR Impact on operating budget O No ❑Yes(See0ebw 403 to just north of FM 518/Broadway. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services Operation and Maintenance Capital Outlay PROJECT JUSTIFICATION Total Expense Will improve water qua 177 and tn'nttiOnin the erea as warranter by the City's water model. FTE Staff Total Cost Avoidance/Payback period Explanation: IMPACT '-y-` i FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report S54,000 S54,000 S54,000 454,000 Land/Right of Way S50,000 $50,000 _ S50,000 S50,000 Design/surveying S81,000 S81,000 S81,000 $81,000 Construction S675,000 1675,000 $675,000 $675,000 Equipment and Furniture SO contingency 5113,400 S113,400 S15,090 S98,310 S113,400 TOTAL COSTS $973,400 $973,400 S0 SO S200,090 S773,310 SO SO SO S973,400 FUNDING SOURCES TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds SO W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash $486,700 $486,700 S100,045 $386,655 $486,700 Impact Fees - Cash $486,700 S486,700 $100,045 , S386,655 S486,700 Impact Fees - Debt SO unfunded SO Other Funding Sources' - SO TOTAL SOURCES $973,400 $973,400 $0 $0 S200,090 S773,310 S0 S0 SO $973,400 I Explain & Identify Type of Other Sources: Project Manager: skipper Jones Project's Approval Date: 3/14/2012 69 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# _ PREFERENCE ORDER Fellows Loop wA1203 8 PROJECT DESCRIPTION _ INCREMENTAL OPERATING AND MAINTENANCE COSTS 7o insta approximately 4,000 feet of 12' water ine to loop from the Impact on operating budget O No ❑Yes(See Below) termination of the existing waterline along the feeder road of BW 8 through Tom Bass Park, connecting to the Lakes of Country Place subdivision.Fiscal year 2013 2014 2015 2016 2017 Approximately 1250 feet of 12" waterline will be completed by Public works Total Revenue in 2012. Personnel Services Operation and Maintenance Capital Outlay PROJECT JUSTIFICATION Total Expense Looping of the distribution system per the water model- Tn a-Yocafion where FTE Staff Total we have a 12" main that dead ends along the Beltway. Cost Avoidance/Payback period Explanation: IMPACT ON SERVICE,LEVE� -- ------ - -- FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report S84,000 $84,000 S84,000 $84,000 Land/Right of way S118,000 $118,000 $118,000 5118,000 Design/Surveying $270,000 S270,000 $270,000 $270,000 Construction $1,808,483 S1,808,483 $59,483 S59,483 S1,749,000 $1,808,483 Equipment and Furniture S0 contingency S311,517 S311,517 $41,517 $41,517 S270,000 S311,517 TOTAL COSTS $2,592,000 $2,592,000 $101,000 $101,000 S0 S472,000 S2,019,000 SO SO 52,592,000 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash 10 Certificates of Obligation S0 Future GO Bonds S0 W/5 Revenue Bonds $0 P.E.D.C. SO System Revenues - cash S1,321,500 $1,321,500 $101,000 S101,000 1211,000 $1,009,500 S1,321,500 Impact Fees - Cash SO Impact Fees - Debt SO unfunded SO Other Funding Sources' - $1,270,500 $1,270,500 $261,000 S1,009,500 S1,270,500 TOTAL SOURCES S2,592,000 S2,592,000 S101,000 4101,000 SO $472,000 S2,019,000 SO SO S2,542,000 1 Explain&Identify Type of Other Sources: Inter local cost sharing agreement with Harris county possible. Project Manager: Andrea Brinkley Project's Approval Date: 3/14/2012 70 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT N/WE __________________________PROJECT#____________________ PREFERENCE ORDER 5u r fa ce water pant wa0812 9 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS — —____ �_—T___—___________T__ ___—___,_ ____ _________—______ ____ __— Phase I Gegan in 2008-2009 with the purc}ase of property for the plant. �rvo El Yes(See Below) Interim work to protect erosion of neighbor's property was constructed in Impact on operating budget 2010. In FY 2014, plant design will begin with a schedule to have the Fiscal Year 2013 2014 2015 2016 2017 plant online in 2019. 10 MGD surface water plant is Phase I of ultimate 201Total Revenue MGD plant. -- — --- - Personnel Services Operation and Maintenanc Capital Outlay PROJECT JUSTIFICATION Total Expense The Water Model uI t to in2007 recommendeTT completion of the FTE Staff Total Surface water Plant i o c—ompTn 2015. Due to the economy, growth has slowed downCost Avoidance/ Payback period Explanation: as compared to the original assumptions of water use. The timing for the Surface water Plant will be evaluated when the Water Model is updated in 2012. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report S2,000,000 $2,000,000 52,000,000 S2,000,000 Land/Right of way S2,461,640 $2,461,640 52,461,640 S2,461,640 S2,461,640 Design/Surveying $4,659,146 54,659,146 S464,146 S464,146 S4,195,000 S4,659,146 Construction S38,924,926 S38,924,926 S1,733,661 S1,733,661 S14,876,506 S14,876,506 $31,486,673 Equipment and Furniture $16,500 S16,500 S16,500 $16,500 S16,500 Contingency S5,416,835 S5,416,835 S34,000 S34,000 S2,231,476 S2,231,476 S4,496,952 TOTAL COSTS S53,479,047 S53,479,047 S4,709,947 $4,709,947 SO S2,000,000 S4,195,000 S17,107,982 S17,107,982 S45,120,911 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO certificates of Obligation SO -Future GO Bonds SO W/S Revenue Bonds S28,234,550 S28,234,550 $3,350,000 S3,350,000 ' $1,000,000 S2,597,500 $8,553,991 S8,553,991 S24,055,482 P.E.D.C. SO System Revenues - Cash SO Impact Fees - Cash SO Impact Fees - Debt 525,134,550 S25,134,550 S1,250,000 S1,250,000 S1,000,000 41,597,500 $8,553,991 S8,553,991 S20,955,482 unfunded $0 Other Funding Sources` - $109,947 S109,947 S109,947 S109,947 $109,947 TOTAL SOURCES S53,479,047 553,479,047 S4,709,947 S4,709,947 SO S2,000,000 $4,195,000 $17,107,982 S17,107,982 S45,120,911 1 Explain &Identify Type of Other Sources: Project to carryover. Fund 42 Fund Balance and reallocation of $109,947 from City of Houston Waterline. Project Manager: Skipper Jones Project's Approval Date: 3/14/2012 71 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM , - PROJECT NAME PROJECT# PREFERENCE ORDER 'FM 1128 16" waterline wA1501 10 -- -- PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS To install approximately-T,TO-feet oT 16-inch water line along FM No EiYes(SeeBelow) Impact on operating budget 1128 (manvel Rd) from Bailey Rd. to CR100. . Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services . , Operation and maintenanc _ Capital Outlay , h PROJECT JUSTIFICATION Total Expense This will loop the system from veterans to FM1128 for pressure and FTE Staff Total I I I I I fire protection based on 2007 water Model Update and is developer driven. Cost Avoidance/Payback period Explanation: IMP, - - ' - FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report $40,450 540,450 $40,450 840,430 Land/Right of way $89,034 S89,034 $89,034 $89,034 Design/Surveying $80,900 $80,900 $80,900 $80,900 Construction S890,000 $890,000 $890,000 $890,000 Equipment and Furniture SO Contingency $202,000 $202,000 $202,000 $202,000 TOTAL COSTS $1,302,384 $1,302,384 $O $O SO $0 $210,384 $1,092,000 $O $1,302,384 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds SO w/S Revenue Bonds SO P.E.D.C. $0 System Revenues - Cash 4651,192 $651,192 $105,192 $546,000 $651,192 Impact Fees - Cash SO Impact Fees - Debt $651,192 4651,192 S105,192 $546,000 $651,192 Unfunded SO Other Funding Sources1 - $O TOTAL SOURCES $1,302,384 $1,302,384 SO $O SO SO S210,384 $1,092,000 SO $1,302,384 I Explain & Identify Type of Other Sources: Project Manager: Cara Davis Project's Approval Date: 3/14/2012 . 72 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT t __�_—______PREFERENCE ORDER___ CR 100 Waterline WA1502 11 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS 7o install—app rroximately 13,160 reet o 16-inch watxr line ado sq CR 1001mpact on operating budget ONo �Yes(See Bebw) from Veterans Dr. to FM 1128 (Manvel Rd). Fiscal Year 2013 2014 2015 2016 2017 Total Revenue _ _ __ _ _ _. Personnel Services Operation and Maintenance Capital Outlay PROJECT JUSTIFICATION Total Expense -This will supply water for future development al-Ong tf' corri owed FTE Staff Total on the 2007 Water Model update, projected growth for 2015 demand and is cost Avoidance/Payback period Explanation: developer driven. MINIIIIIIIIMIMMIIIIMIIIMMI FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report S87,800 $87,800 $87,800 S87,800 Land/Right of Way S200,000 5200,000 S200,000 5200,000 Design/Surveying S175,650 S175,650 S175,650 S175,650 Construction S1,932,100 S1,932,100 S1,932,100 S1,932,100 Equipment and Furniture S0 Contingency $439,110 $439,110 $439,110 S439,110 TOTAL COSTS $2,834,660 $2,834,660 SO SO SO S0 $463,450 S2,371,210 $0 S2,834,660 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation S0 Future GO Bonds SO w/s Revenue Bonds $1,185,605 $1,185,605 S1,185,605 S1,185,605 • P.E.D.C. SO System Revenues - Cash S231,725 S231,725 $231,725 $231,725 Impact Fees - Cash SO Impact Fees - Debt $1,417,330 S1,417,330 $231,725 S1,185,605 $1,417,330 Unfunded $0 Other Funding Sources' - SO TOTAL SOURCES S2,834,660 S2,834,660 S0 SO $0 SO $463,450 S2,371,210 $0 S2,834,660 t Explain & Identify Type of Other Sources: Project Manager: Cara Davis Project's Approval Date: 3/14/2012 73 CITY OF PEARLAND, TEXAS 2013 — 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT I PREFERENCE"ORDER_H_ar75__R—.—f_o_«CR1_0_17_—R12___CR 1_2_8_7 r_m_liaar-_e___to _ete�ans__________—..WA__5__ 1_2_ PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS io instalf approximately 13,300 feet of 12-inch water line 7rom Harkey Impact on operating budget L'1 No wes(seeBebw) Rd/CR100 south to CR128 then east to Veterans Dr. Fiscal Year 2013 2014 2015 2016 _ 2017 Total Revenue Personnel Services Operation and Maintenance Capital Outlay PROJECT.JUSTIFICATION Total Expense a—aFVy This will loop the system between Rd. anT Veteransnroe CR100_to FTE Staff Total CR128 for pressure and fire protection based on 2007 water Model Update for 2015 demand and is developer driven. Cost Avoidance/Payback period Explanation: FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report 569,870 469,870 $69,870 $69,870 Land/Right of way $223,426 $223,426 S223,426 $223,426 Design/Surveying $139,740 $139,740 5139,740 $139,740 Construction S1,537,150 41,537,150 $1,537,150 $1,537,150 Equipment and Furniture SO contingency $349,350 $349,350 $349,350 S349,350 TOTAL COSTS 42,319,536 42,319,536 S0 SO S0 SO $433,036 S1,886,500 SO S2,319,536 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation S0 Future GO Bonds SO w/S Revenue Bonds 4943,250 $943,250 1943,250 $943,250 P.E.O.C. SO System Revenues - Cash 4216,518 $216,518 $216,518 S216,518 Impact Fees - Cash SO Impact Fees - Debt 41,159,768 $1,159,768 $216,518 $943,250 41,159,768_ Unfunded $0 Other Funding sourcesi - SO TOTAL SOURCES $2,319,536 $2,319,536 S0 SO SO SO $433,036 S1,886,500 SO S2,319,536 I Explain & Identify Type of Other Sources: Project Manager: Cara Davis Project's Approval Date: 3/14/2012 o 74 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER veterans or. Bailey Rd. to CR 128 16" waterline wA1504 13 PROJECT DESCRIPTION _ INCREMENTAL OPERATING AND MAINTENANCE COSTS i_______________—_ ________ ___nc _ To tns tall approximately 5,300 feet ot• 16-inch water line on Veterans impact on operating budget ❑�rvo ves(See Bebw) Dr. from Bailey Rd, south to CR 100 and continue an additional 5,300 feet with a 12-inch line from CR 100 to CR 128. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue _ Personnel Services Operation and Maintenance Capital Outlay PROJECT JUSTIFICATION Total Expense __ _T — _________,_r_________________________ ___�_________ __ This will supply to the city limits and En south o1= ea�ley R�. 7or FTE staff Total ' 1 future development based on 2007 water Model Update for 2015 demand and cost Avoidance / Payback period Explanation: is developer driven. IMPACT.ON SERVI• FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report S66,296 466,296 466,296 S66,296 Land/Right of Way 4268,000 4268,000 4268,000 4268,000 Design/surveying $132,593 4132,593 - $132,593 $132,593 Construction S1,460,000 $1,460,000 41,460,000 $1,460,000 Equipment and Furniture SO Contingency S331,480 $331,480 $331,480 $331,480 TOTAL COSTS S2,258,369 S2,258,369 S0 So SO SO $466,889 $1,791,480 S0 S2,258,369 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash — S0 Certificates of Obligation $0 Future GO Bonds $O W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash S1,129,185 S1,129,185 $233,445 $895,740 S1,129,185 Impact Fees - Cash $233,444 $233,444 $233,444 $233,444 Impact Fees - Debt $895,740 1895,740 $895,740 $895,740 Unfunded $0 other Funding Sources' - SO TOTAL SOURCES S2,258,369 S2,258,369 SO SO So SO $466,889 $1,791,480 So $2,258,369 ' Explain &Identify Type of other sources: Project Manager: Cara Davis Project's Approval Date: 3/14/2012 75 CITY OF PEARLAND, TEXAS 2013 — 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT S PREFERENCE ORDER — FM 521 w'a to rl7ne (Broadway to Mooring Pointer) WA1505 14 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS 77500-1-eet of 16" water line_along Almeda Rd From Broadway to Mooring Impact on operating budget UNo L'Ives(See Bebw) Pointer. Fiscal year 2013 2014 2015 2016 2017 Total Revenue Personnel Services Operation and Maintenance, Capital Outlay PROJECT JUSTIFICATION _ _ Total E�ense Looping of transmission Tines based on the Ciiyrs water made-1___ I I FTE Staff Total Cost Avoidance/Payback period Explanation: IMPACT ON SERVICE LEVELS FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report 445,630 445,630 S45,630 445,630 Land/Right of Way SO Design/surveying S91,260 $91,260 S91,260 $91,260 Construction $1,003,860 $1,003,860 S1,003,860 $1,003,860 Equipment and Furniture I SO Contingency $228,150 5228,150 S228,150 S228,150 TOTAL COSTS S1,368,900 S1,368,900 S0 S0 SO 40 S136,890 S1,232,010 SO S1,368,900 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash So Certificates of Obligation SO Future GO Bonds SO W/S Revenue Bonds $0 P.E.D.C. SO System Revenues - Cash S684,450 4684,450 S68,445 S616,005 S684,450 Impact Fees - Cash S68,445 568,445 468,445 S68,445 Impact Fees - Debt $616,005 $616,005 $616,005 $616,005 unfunded SO Other Funding Sources' - SO TOTAL SOURCES S1,368,900 S1,368,900 SO S0 SO SO S136,890 S1,232,010 SO S1,368,900 ' Explain & Identify Type of Other Sources: Project Manager: Skipper Jones Project's Approval Date: 3/14/2012 76 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT f PREFERENCE ORDER _ __ _ — ____ ____ _ ____. __________________—___01 ______ Grand eou�evard waterline - Old Towns�te southeast Quadrant WA1601 15 PROJECT.DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS i�_ ___u_._.______________n__e _._____ __ r_ __________ Replace w—atem Ines throughout the Odd Town area to current city standards.Impact on operating budget ❑No ❑Yes(See Below) This project is estimated to replace 1300 if of 8" water line, fire Fiscal Year 2013 2014 2015 2016 2017 hydrants, service connections, and main line valves. Construction will b� completed in conjunction with the reconstruction of Grand Blvd. Total Revenue Personnel Services Operation and Maintenance Capital Outlay PROJECT JUSTIFICATION Total Expense Existing water T nes in the Old Tow are a are a hodgepodge of-gaTva'zed steel, ductile iron, asbestos/concrete, and PVC. In many cases, sizes ancl,FTE staff Total locations of pipe are unknown. Valves do not generally exist in necessary Cost Avoidance/Payback period Explanation: areas. This has created havoc within the Old Townsite southeast quadrant. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION TOTAL CITY FUNDED ESTIMATED PROJECT " BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report SO Land/Right of Way SO Design/Surveying S14,198 S14,198 S14,198 S14,198 Construction $108,835 S108,835 4108,835 S108,835 Equipment and Furniture SO Contingency S24,848 S24,848 S24,848 S24,848 TOTAL COSTS S147,B81 $147,881 SO SO SO SO SO S14,198 $133,683 S147,881 FUNDING SOURCES TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 .r 2014 2015 2016 2017 TOTAL General Revenue - Cash SO certificates of Obligation SO Future GO Bonds So W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash SO Impact Fees - Cash SO Impact Fees - Debt SO Unfunded $147,881 S147,881 S14,198 S133,683 S147,881 Other Funding Sources' - SO TOTAL SOURCES S147,881 S147,881 SO SO SO SO S0 S14,198 S133,683 S147,881 1 Explain & Identify Type of Other Sources: Project Manager: Andrea Brinkley Project's Approval Date: 3/14/2012 77 CITY OF PEARLAND, TEXAS 2013 - 2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME, _____________ _____ PROJECT/. PREFERENCE ORDER ___ Green Tee Rehabi itaiion wA1701 PROJECT DESCRIPTION •_ at_r pumping tat sion to i--e mna ite comi water from Impact on operating budget - No 0 Yes(SeeBebw) Clear Brook City MUD and transform the station into a booster station. The station will then be available to refresh the chlorine residual in the Fiscal Year 2013 2014 2015 2016 2017 water or to boost pressure in the area. This is a place mark for the total Revenue project. Before we would be able to move forward, the 12" water line froaw --_ -> -- — -s Dixie Farm to Bellavita must be installed and producing the anticipated Personnel services pressure needed to eliminate the water take of 3 million gallons per month from Clearbrook City MUD. operation and Maintenance ($102,000) • Capital Outlay PROJECT JUSTIFICATION _ Total Expense (S102,000) • is il wd pr imove at wer quality in the area. FTE Staff Total , Th Cost Avoidance/Payback period Explanation: This will eliminate a very high-priced water source while still maintaining functional use of the equipment. IMPACT ON SERVICE LEVELS FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report So Land/Right of way SO Design/Surveying S42,071 S42,071 S42,071 S42,071 Construction S420,709 S420,709 $420,709 4420,709 Equipment and Furniture SO Contingency S46,278 $46,278 S46,278 S46,278 TOTAL COSTS S509,058 S509,058 SO SO S0 SO S0 SO $509,058 $509,058 FUNDING SOURCES TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds $0 W/S Revenue Bonds $0 P.E.D.C. $0 System Revenues - Cash S509,058 S509,058 S509,058 S509,058 Impact Fees - Cash $0 Impact Fees - Debt SO unfunded S0 other Funding Sources' - S0 TOTAL SOURCES S509,058 S509,058 SO SO SO SO SO $0 $509,058 S509,058 ' Explain & Identify Type of Other Sources: Project Manager: Public Works Project's Approval Date: 3/14/2012 78 CITY OF PEARLAND 2013-2017 CAPITAL IMPROVEMENT PROGRAM WASTEWATER Project No. Project Name 2013 2014 2015 2016 2017 TOTAL WW1202 WWM Project 19-Broadway Trunk Sewer Extension 136,992 136,992 WW1203 Walnut Lift Station 588,000 588,000 WW1302 WWM Project 5 Mykawa/Scott SCADA Lift Station 147,496 210,709 2,719,878 3,078,083 WW1304 WWM Project 17 West Oaks Lift Station Retirement 36,872 143,350 180,222 WW1303 Eliminate Somersetshire Lift Station 151,844 151,844 WWM Project 31A-Southdown(North Central)WWTP WW1201 Expansion 1,307,220 4,158,942 4,158,942 9,625,104 WWM Project 33 Orange Mykawa Lift Station WW1301 Retirement 119,945 481,238 601,183 WW1401 WWM Project 21 Oak Brook Estates Lift Station 256,190 256,190 WW1403 WWM Project 8 West Lea Force Main 134,445 134,445 WW1402 Pearland Heights Lift Station 255,024 255,024 McHard Rd Trunk Sewer(Mykawa to Southdown WW1601 WWTP) 2,406,636 9,299,410 11,706,046 WWM Project 12 Roy/Max/Garden Roads Basin WW1501 Sewage System 429,200 1,868,000 2,297,200 WW1502 Barry Rose WWTP Expansion 450,000 900,000 10,350,000 11,700,000 WWM Project 11 Veterans Drive Lift Station Service WW1602 Area 438,450 6,861,549 7,299,999 WW1603 WWM Project 29A-JHEC WWTP Expansion 400,000 2,000,000, 2,400,000 TOTAL $ 1,061,204 $ 2,426,883 $ 8,239,258 $ 10,172,028 $ 28,510,959 $ 50,410,332 79 CITY OF PEARLAND 2013-2017 CAPITAL IMPROVEMENT PROGRAM WASTEWATER SOURCE OF FUNDS 2013 2014 2015 2016 2017 TOTAL General Revenue-Cash Certificates of Obligation Future GO Bonds W/S Revenue Bonds 6,878,820 6,565,578 18,157,763 31,602,161 P.E.D.C. System Revenues-Cash 827,563 1,214,926 695,838 1,102,550 2,500,000 6,340,877 Impact Fees-Cash 86,145 184,353 214,600 269,900 754,998 Impact Fees-Debt 1,027,604 450,000 2,234,000 7,853,196 11,564,800 Unfunded Other Funding Sources 147,496 147,496 TOTAL $ 1,061,204 $ 2,426,883 $ 8,239,258 $ 10,172,028 $ 28,510,959 $ 50,410,332 80 -- -g- 7 _s ,'or --Ti we. - V' t • y +X • _ I #tor'.. . -- - - _ O t•• • _ _. _ �_ ;.`d %y>. .� uT L;Z,1 I .-, - - 1T a:W.s`.¢S � ti 7 �.s��. . iF • i. .r`r � a In F 'w .._ 'fir,, ] L. . "`-'`'r ti - dE 1 . Q .j f " . / - .,C4)4, . 1 ,� P� �1 _ =/ +P ....� ?\ 1. w y,I t 1 ! - beak° +. ' 'S� y /?fit M-, �yI ^/ '9, 13iir 61 r. --- .m {-,. ~•a '> ; _u 4,..,) ``` ` ca [t,p-, ''`ldht _ , Tt a t i-1--. `t V`,, •4 , /t/y..,y.Y , . # � 1� I • l ! l 1 P R �'1' 'I'� � / u } 1rt ;:� WASTEWATER CIP 2013-2017 - P REFERENCE NO. PROJECT NAME YEM OF FUNDING WaaN LR Staten 2013 - - - '� f knower Sm,waeYn N LA Mew 2011 -- �� WWN....SJ rvr Oge M2ka..LR SIalion RN/remelt 201a-2015 -- - ""' t� NNW Protect 51.40ceweaco0 SCA.Le Malice 2016/015 ... WW1A Prop)l WesI Lee Force Mae 2011 _- _. WWM Propol 12 Weal Oaks LalSuwl Retremeni 20162014 �_-.. .. _ ..-. _ . _'-',`1 �,; ANNA Propel]1A Spa tedwon(.19 Cenlral)W WTP Expansion 2014-2010 •9n`{- ` '{' •� Prop.19•Brwhry True Sewer 5...6. 2011 Maples Ll Melon 2014 x • R R 1 . Service 11 VNerane Dom LA Stolen Serve hoe 20162017 - E ETrvM Smear(Wow.lo Soulheoen WWTP) 201 2017 - MAW opci 12 RgMx/GeNee Rowls Base Sewage SysNan 20162010 ».�a�i 'MARA opct Mk-JEC WWTP E,Panaen 201620 }y -- `2 ,4` NNW op121 Oak Ceaak LeWaLTSlalon 4 B WWTP PYIE y'• ..n T'yl .1 17I4a:e • !. owa.,..e.<..,.....wo.>r. wo.P... .w.. City of Pearland 9�►, 2013-2017 CIP o e. ,..,.ea,.w.e....,.... 0 0.5 1 2 .� pa_.,.w,w®..w..,,.,.,w,.,,. ®..e..aw.na.eAwew.o...w.,.a.. w..a . ,v.�N �... ,. Miles Wastewater ®»b: ",�.��: ";.:,..., .e�.,:�...w ::. GIS N CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME ___ __ _______________- PROJECT# ________j______ __ _Y _____-_____ _ ________ _ WwM Pro ect 19 Bro adwa Trunk Sewer Extension 7TAWITO52 1 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS This pro]ect Consists of a new 12' sewer line for app ro ximaieTy 1,160 Teet LINO ❑Yes(See Below) along Broadway from Country Club or. to Regal Oaks Ln. Impact on ope rati n9 budget _ Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services operation and Maintenance (48,933) ($8,933) (S8,933) (S8,933) Capital Outlay PROJECT JUSTIFICATION Total Expense (S8,933) ($8,933) (S8,933) (S8,933) This project wT1T provide gravity sewer to vacant p op rerties norti ant south FTE Staff Total of Broadway east of Liberty/Country Club as well as serve properties that Cost Avoidance/ Payback period Explanation: aren't currently served and eliminate Pirates Alley Lift Station. Elimination of existing Lift Station. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET TMRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report SO Land/Right of way S0 Design/surveying S18,008 S18,008 $18,008 S18,008 S18,008 Construction 4116,102 S116,102 4116,102 S116,102 Equipment and Furniture SO Contingency S20,890 S20,890 S20,890 S20,890 TOTAL COSTS $155,000 $155,000 $18,008 S18,008 S136,992 S0 S0 SO SO S155,000 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET TNRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation S0 Future GO Bonds S0 W/S Revenue Bonds SO P.E.D.C. SO system Revenues - Cash $68,855 S68,855 S18,008 S18,008 S50,847 S68,855 Impact Fees - Cash S86,145 S86,145 186,14S S86,145 Impact Fees - Debt S0 unfunded S0 other Funding Sources' - So TOTAL SOURCES S155,000 $155,000 $18,008 S18,008 S136,992 S0 SO SO SO $155,000 ' Explain &Identify Type of Other Sources: Possibly funded with development project Manager: Public works Project's Approval Date: 3/14/2012 82 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER walnut Lift Station WW1203 2 PROJECT DESCRIPTION _ INCREMENTAL OPERATING AND MAINTENANCE COSTS aepTace the waTnue regional lift station with a new lint station at or ENO ❑+ves(See Below) near the same location. The replacement lift station will be Impact on operating budget approximatley 1/3 smaller after current flows are removed by the Fiscal year 2013 2014 2015 2016 2017 Hatfield Basin Trunk Sewer Line project. Total Revenue Personnel Services operation and Maintenance ($2,978) ($2,978) ($2,978) (S2,978) Capital Outlay PROJECT JUSTIFICATION Total Expense (42,978) (S2,978) (42,978) (52,978) The existing_ ift_l station requires confined space entry 7;77 basic FTE Staff Total maintenance, which is a safety concern. The lining inside the lift station is failing, and a hole has developed in the floor of the dry well Cost Avoidance/ Payback period Explanation: (through to the wet well). some of the pump suction piping has also failed, and the remainder of the piping is in very poor condition. '6:`ON SER FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report $21,000 S21,000 421,000 421,000 $21,000 Land/Right of way S10,000 S10,000 S10,000 S10,000 S10,000 Design/Surveying S84,000 S84,000 S84,000 S84,000 S84,000 Construction $490,000 $490,000 S490,000 $490,000 Equipment and Furniture S0 Contingency S98,000 S98,000 S98,000 S98,000 TOTAL COSTS S703,000 $703,000 S115,000 S115,000 $588,000 50 40 S0 So $703,000 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash S0 Certificates of Obligation S0 Future GO Bonds S0 W/S Revenue Bonds SO P.E.D.C. SO System Revenues - Cash $588,000 S588,000 4588,000 $588,000 Impact Fees - Cash SO Impact Fees - Debt Unfunded S0 other Funding Sources' - S115,000 S115,000 S115,000 $115,000 4115,000 TOTAL SOURCES S703,000 $703,000 $115,000 4115,000 S588,000 S0 S0 SO SO $703,000 I Explain & Identify Type of Other Sources: Fund 203 Fund Balance Project Manager: Jennifer Lee Project's Approval Date: 3/14/2012 83 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT 8 PREFER_ENC_E___O_R_DE_R_ WaM Project 5 Mykawa/Scott SCADA Lift station Ww130? 3 '— PROJECT DESCRIPTION __ INCREMENTAL OPERATING AND MAINTENANCE COSTS plem Reacent of�the—existing Tf statTon,—_a new 1 _2" Torce__main,Impact on operating budget Hilo UYes(See Below)2,500 feet, from Mykawa to SH35 and a new 8 - 12' gravity line, approximately 3,430 feet along Mykawa from Scott Street Fiscal Year 2013 2014 201S 2016 2017 to Shank. Project will be coordinated with Mykawa Rd. Construction. Total Revenue Personnel Services Operation and Maintenance (f2,233) (18,933) (58,933) Capital Outlay PROJECT JUSTIFICATION __ Total Expense - ___ .02,233)_ (58,933) (58,933) sin h The Mykawa-Scott baas heavy I/I—based- on pump run time. FTE Staff Total I I Rehabilitation of the basin with the above improvements will reduce Cost Avoid flow to the Barry Rose rP, reduce surcharging in the McHard 24" Avoidance/Payback yback period Explanation: ww trunk sewer, and eliminate one lift station. The project will also Elimination of existing Lift Station and avoidance of a lift station rehabilitation in remove the existing line from underneath the future widening of Mykawa2016 at an estimated amount of S15,000. Road. IMPACT ON S FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report 4147,496 S147,496 S147,496 S147,496 Land/Right of Way S158,578 S158,578 5158,578 $158,578 Design/surveying $210,709 $210,709 5210,709 S210,709 Construction 52,227,217 52,227,217 52,227,217 52,227,217 Equipment and Furniture SO Contingency $334,083 S334,083 S334,083 S334,083 TOTAL COSTS S3,078,083 S3,078,083 S0 SO $147,496 $210,709 S2,719,878 S0 SO S3,078,083 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CTY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds SO W/S Revenue Bonds S2,719,878 S2,719,878 S2,719,878 S2,719,878 P.E.D.C. f0 System Revenues - Cash $210,709 $210,709 $210,709 S210,709 Impact Fees - Cash SO Impact Fees - Debt SO unfunded SO Other Funding Sources' - S147,496 S147,496 S147,496 $147,496 TOTAL SOURCES $3,078,083 $3,078,083 50 So S147,496 S210,709 S2,719,878 SO SO S3,078,083 1 Explain & Identify Type of Other Sources: Fund 67 Fund Balance Project Manager: Jennifer Lee Project's Approval Date: 3/14/2012 84 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER _ --_-___ -____-____�_ ____-__z______r_________________-__--_______________-___-T wwM Project 17 west Oaks Lift station Retirement wW1304 4 PROJECT DESCRIPTION -�+-�- _ _ INCREMENTAL.OPERATING AND MAINTENANCE COSTS Abandonment 0�-th2 west oal5 Iif statlon dna 1riifi Tat10f1 7 a neW 12- UNo U Yes(See Below) inch gravity sewer line along Harkey Road for approximately 771 feet. Impact on operating budget Fiscal Year 2013 2014 2015 2016 _ 2017 Total Revenue __ _ Personnel Services operation and Maintenance ($4,467) ($8,933), ($8,933) ($8,933) capital Outlay PROJECT JUSTIFICATION Total Expense ($4,467) (S8,933) ($8,933) ($8,933) This project wil-T eliminae th e lilt station, which Ts_ _ -Ire a major FTE Staff Total rehabilitation and divert the flow to gravity lines. Cost Avoidance/Payback period Explanation: Elimination of existing Lift Station and avoidance of a lift station rehabilitation in 2015 at an estimated amount of S75,000. IMPACT ON SERVICE LEVELS 41111, FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report SO Land/Right of way S17,212 S17,212 S17,212 $17,212 Design/surveying $19,660 $19,660 S19,660 S19,660 construction S126,000 S126,000 $126,000 S126,000 Equipment and Furniture S0 Contingency S17,350 $17,350 S17,350 S17,350 TOTAL COSTS $180,222 $180,222 SO SO $36,872 S143,350 SO SO 30 $180,222 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash 10 Certificates of Obligation SO Future GO Bonds SO W/S Revenue Bonds $0 P.E.D.C. SO system Revenues - cash S180,222 $180,222 $36,872 S143,350 S180,222 Impact Fees - Cash S0 Impact Fees - Debt SO Unfunded So Other Funding Sources' - SO TOTAL SOURCES $180,222 S180,222 SO So S36,872 S143,350 S0 SO SO $180,222 ' Explain & Identify Type of Other Sources: Public works Will be doing the construction. Project Manager: Public works Project's Approval Date: 3/14/2012 85 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT• PREFERENCE ORDER ___ Eliminate Some rse is fi ire��Tt Station wW1303 5_ PROJECT DESCRIPTION _ ta _ INCREMENTAL OPERATING AND MAINTENANCE COSTS Re rou __, tee tfie—sewer going to King Aho_rrs Couturt -'.i ft st�ori_to Impact on operating budget -Ives(See Below) Southampton lift station instead. will require about 680 if of 12" sanitary sewer through primarily backlot easements. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services Operation and Maintenance (S2,233) ($8,933) ($8,933) (S8,933) (88,933) Capital Outlay PROJECT JUSTIFICATION Total Expense (S2,233) ($8,933) (48,933) ($8,933) (48,933) Elimination o existing temporary lift station that has been in place FTE Staff Total for over 12 years. Without the reroute, it would require acquisition of cost Avoidance/Payback period Explanation: a permanent lift station site and construction of the lift station. Elimination of existing Lift Station and avoidance of a lift station rehabilitation in 2014 at an estimated amount of S150,000. IMPACT ON SERV. - _AA.— FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 201S 2016 2017 ' .TOTAL Preliminary Engineering Report SO Land/Right of way S35,000 S35,000 S35,000 $35,000 Design/Surveying S11,040 S11,040 S11,040 $11,040 Construction S92,000 S92,000 S92,000 S92,000 Equipment and Furniture SO Contingency S13,804 S13,804 S13,804 S13,804 TOTAL COSTS S151,844 S151,844 SO S0 S151,844 SO S0 S0 SO S151,844 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds So W/S Revenue Bonds SO P.E.D.C. $0 System Revenues - Cash 5151,844 $151,844 $151,844 S151,844 Impact Fees - Cash SO Impact Fees - Debt SO unfunded So other Funding Sources' - S0 TOTAL SOURCES S151,844 S151,844 SO SO S151,844 $0 SO SO 50 5151,844 ' Explain & Identify Type of Other Sources: Project Manager: TBD Project's Approval Date: 3/14/2012 86 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME _ _��_____ __ ___—�__�__�______ _ _PROJECT k _PREFERENCE OR_OE_R _ __ _ --____, wwM Project 31A Soutidown North central} WWTP Expansion w61201 6 —_— PROJECT DESCRIPTION • INCREMENTAL OPERATING AND MAINTENANCE COSTS A Pre�imi nary Engi neen ng Report (PER) will be completed_to evaluate the Impact on operating budget UNo ❑Yes(See Below) alternative of a 1 MGD VAYTP plant expansion or diversion of flows to the Far Northwest WWTP. A design/construction project scope will be finalized once Fiscal Year 2013 2014 2015 2016 2017 the PER has been completed. Total Revenue __. __, ____®_ Personnel Services Operation and Maintenance Capital Outlay PROJECT JUSTIFICATION Total Expense Presently the Southdown wwTP is a 0.95 mga p-Yant runni nq at approzimate1'y sow' Staff Total capacity. with projected growth in this area, a 1 Mgd expansion capacity "Cost Avoidance /Payback period Explanation: planned. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report 4500,000 S500,000 S500,000 SS00,000 SS00,000 Land/Right of Way SO Design/Surveying $1,307,220 S1,307,220 S1,307,220 $1,307,220 Construction $7,167,884 - S7,167,884 S3,583,942 $3,583,942 $7,167,884 Equipment and Furniture S0 Contingency S1,150,000 51,150,000 S575,000 S575,000 S1,150,000 TOTAL COSTS $10,125,104 S10,125,104 S500,000 $500,000 S0 $1,307,220 $4,158,942 S4,158,942 SO $10,125,104 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of obligation SO Future GO Bonds SO w/S Revenue Bonds S8,317,884 S8,317,884 S4,158,942 S4,158,942 S8,317,884 P.E.D.C. $0 System Revenues - Cash $279,616 S279,616 $279,616 S279,616 Impact Fees - Cash $500,000 S500,000 $500,000 $500,000 $500,000 Impact Fees - Debt S1,027,604 $1,027,604 S1,027,604 $1,027,604 unfunded S0 Other Funding sources' - $0 TOTAL SOURCES S10,125,104 S10,125,104 SS00,000 S500,000 SO S1,307,220 S4,158,942 S4,158,942 SO $10,125,104 ' Explain &Identify Type of Other Sources: Project Manager: Andrea Brinkley Project's Approval Date: 3/14/2012 87 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME. PROJECT PREFERENCE ORDER wwM Project 33 Orange Mykawa tilt Stav on Retirement ww1301 PROJECT DESCRIPTION_ io n INCREMENTAL OPERATING AND MAINTENANCE COSTS Ab ndonmnt ae Oi lift stat and in la staltio n o _new_12-inch gravity Impact on operating budget Li No LI Yes(See Below) sewer line along Mykawa from Orange to walnut for approximately 3,386 feet. To be completed in coordination with Mykawa Road Fiscal Year 2013 2014 2015 2016 2017 construction. Total Revenue Personnel Services Operation and Maintenance ($4,467) ($8,933) (S8,933) Capital Outlay PROJECT JUSTIFICATION Total Expense (S4,467) (S8,933) ($8,933) Replacement of an old lift station that pumps wastewater three times FTE Staff Total 1 1 before sending to the plant. In addition, this lift station will Cost Avoidance/ Payback period Explanation: require a major rehabilitation within the next five years. The project will also eliminate an inverted siphon gravity line and Elimination of existing Lift Station and avoidance of a lift station rehabilitation in remove the existing lines from being in conflict with the drainage 2015 at an estimated amount of S85,000. for the Mykawa Road project. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report $27,167 S27,167 S27,167 S27,167 Land/Right of way $53,968 S53,968 S53,968 S53,968 Design/Surveying S38,810 S38,810 S38,810 S38,810 Construction S423,024 S423,024 S423,024 S423,024 Equipment and Furniture SO Contingency S58,214 S58,214 S58,214 S58,214 TOTAL COSTS S601,183 S601,183 S0 SO SO S119,945 S481,238 SO S0 S601,183 FUNDING SOURCES TOTAL CITY FUNDED ESTIMATED PROJECT BUDGET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL-- General Revenue - Cash S0 Certificates of Obligation SO Future GO Bonds SO W/S Revenue Bonds S0 P.E.D.C. SO System Revenues - Cash S601,163 $601,183 5119,945 5481,238 $601,183 Impact Fees - Cash SO Impact Fees - Debt SO unfunded SO other Funding Sources' - S0 TOTAL SOURCES $601,183 $601,183 SO SO 50 4119,945 S481,238 SO S0 $601,183 ' Explain & Identify Type of Other Sources: Project Manager: Skipper Jones Project's Approval Date: 3/14/2012 88 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT A PREFERENCE ORDER _�_________ WWM ct Proje 21 k OaBrook Estatesilt tion L Sta PROJECT DESCRIPTION • _ INCREMENTAL OPERATING AND MAINTENANCE COSTS Abandonment of 1 ft station and instal�etion of new-l2-ince gravity sewer Impact on operating budget ❑No Li Yes(See Beim) line from Branch Hill Drive along a proposed back-lot easement to nixie Farm Road for approximately 850 feet. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services Operation and Maintenance ($8,933) (S8,933) (58,933) Capital outlay PROJECT JUSTIFICATION _ Total Expense (S8,933) (S8,933) (f8,933) wastewater Modng�esiNeeds 7o bbe completed when vacant properties to_the FTE Staff Total southwest of the existing lift station develops. Cost Avoidance/Payback period Explanation: Elimination of existing Lift Station and avoidance of a lift station rehabilitation in 2015 at an estimated amount of S12,500. iiillMIIIIMIIIMIEMEIMM FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report SO Land/Right of Way $22,330 S22,330 S22,330 S22,330 Design/Surveying $27,060 $27,060 $27,060 S27,060 construction $173,800 $173,800 S173,800 S173,800 Equipment and Furniture SO contingency $33,000 S33,000 S33,000 $33,000 TOTAL COSTS $256,190 $256,190 SO SO SO S256,190 SO SO SO $256,190 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds SO W/S Revenue Bonds SO P.E.D.C. S0 System Revenues - Cash S139,060 $139,060 $139,060 S139,060 Impact Fees - Cash $117,130 $117,130 S117,130 S117,130 Impact Fees - Debt SO unfunded SO Other Funding Sources' - SO TOTAL SOURCES S256,190 S256,190 SO S0 SO 4256,190 SO SO SO S256,190 ' Explain & Identify Type of Other Sources: Project Manager: TBD Project's Approval Date: 3/14/2012 89 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT± PREFERENCE ORDER wwM Project 8 west Lea Force Main ww1403 9 PROJECT DESCRIPTION INCREMENTAL OPERATING.AND MAINTENANCE COSTS R lace exepisting 671 nchith_8-wincF force main along the sewer easement Impact on operating budget U No Ll yes(see oeaw) from the West Lea Lift Station to Quail Run Drive for approximately 697 feet. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue _ Personnel services Operation and Maintenance Capital Outlay PROJECT JUSTIFICATION _ _ - Total Expense Nec essary when--adc-lit�onal_Mows ere _ rd ae�to _t}:e system.__Developer FTE Staff Total I l I I I driven. cost Avoidance/Payback period Explanation: IMPACT°M SERVICE LEVELS FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report S6,450 S6,450 56,450 S6,450 Land/Right of Way S4,500 S4,500 S4,500 S4,500 Design/surveying S9,220 $9,220 S9,220 S9,220 Construction $100,450 S100,450 S100,450 S100,450 Equipment and Furniture SO Contingency S13,825 413,825 S13,825 S13,825 TOTAL COSTS S134,445 $134,445 So S0 S0 1134,445 SO SO SO $134,445 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds SO W/S Revenue Bonds SO P.E.D.C. S0 System Revenues - Cash S67,222 S67,222 S67,222 S67,222 Impact Fees - Cash S67,223 S67,223 S67,223 467,223 Impact Fees - Debt SO unfunded SO other Funding sources' - SO TOTAL SOURCES S134,445 $134,445 S0 S0 SO S134,445 SO SO S0 S134,445 ' Explain & Identify Type of Other Sources: Public works will be doing construction. Project Manager: Public works Project's Approval Date: 3/14/2012 90 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME _ ________—_ PROJECT,t—_�__—�_ PREFERENCE ORDER PearTand-Heights Litt Station ww1402 10 PROJECT DESCRIPTION' S _ _ - INCREMENTAL"OPERATING AND'MAINTENANCE COSTS Reroute the se wer going to PearTana Heights'1i fft station to Spring Meadow Impact on operating budget LI No EYes(See Below) lift station instead. Estimation is based on approximately 1700 If of 12' sanitary sewer. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services Operation and Maintenance (S4,467) (48,933) (S8,933) (S8,933) Capital Outlay PROJECT JUSTIFICATION __ _ Total Expense (S4,467) (S8,933) ($8,933) ($8,933) Tate existing Fitt station._The existing titt station isin ver/FTE Staff Total poor condition and will require extensive rehabilitation if it is Cost Avoidance/ Payback period Explanation: retained. Elimination of existing Lift Station and avoidance of a lift station rehabilitation in 2014 at an estimated amount of S75,000. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report S0 Land/Right of way S0 Design/Surveying S24,840 S24,840 S24,840 S24,840 Construction S207,000 $207,000 $207,000 $207,000 Equipment and Furniture SO Contingency S23,184 S23,184 $23,184 S23,184 TOTAL COSTS S255,024 S255,024 So S0 So S255,024 S0 SO SO 5255,024 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash S0 Certificates of Obligation S0 Future GO Bonds S0 W/S Revenue Bonds So P.E.D.C. S0 System Revenues - Cash $255,024 S255,024 S255,024 S255,024 Impact Fees - Cash So Impact Fees - Debt S0 unfunded S0 other Funding Sources' - S0 TOTAL SOURCES $255,024 S255,024 S0 SO S0 S255,024 SO S0 S0 S255,024 ' Explain & Identify Type of other sources: Project Manager: Teo Project's Approval Date: 3/14/2012 91 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME PROJECT# PREFERENCE ORDER Mc707 Rd Trunk Sealer (M yrcdWd t0 SOUtj1TOWn WWTP) iJW1601 11 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS ado _ Instar TmcDard_Rd_approxlmate1 _6,587-Te'et��o�-24-trunk sewer'rom Impact on operating budget No 7Yg«Beb"') Mykawa Rd to O'Day, 2,032 feet of 30" sewer from O'Day to Garden Rd, 6,247 feet of 36" sewer from Garden Rd to Stone Rd and 8,112 feet of 42" sewer Fiscal Year 2013 2014 2015 2016 2017 from stone Rd to Southdown WWTP. This project will be completed in Total Revenue coordination with the McHard Road Extension from Cullen to Mykawa. -- ---Personnel Services operation and Maintenance Capital Outlay PROJECT JUSTIFICATION r Total Expense TTiis project WITl provide gravity Sewre ana is caTred TOr In tree wastewater FTE Staff Total model. Extends Southdown service area to the east, picking up areas not Cost Avoidance/Payback period Explanation: currently served by City system. FY PROJECTED APPROPRIATIONS - PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report S0 Land/Right of way S1,000,000 $1,000,000 $1,000,000 $1,000,000 Design/Surveying S1,406,636 S1,406,636 S1,406,636 S1,406,636 Construction S8,283,508 S8,283,508 S8,283,508 S8,283,508 Equipment and Furniture SO Contingency S1,015,902 S1,015,902 S1,015,902 S1,015,902 TOTAL COSTS 511,706,046 S11,706,046 SO SO SO SO S0 S2,406,636 S9,299,410 S11,706,046 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO certificates of obligation S0 Future GO Bonds SO W/S Revenue Bonds $11,706,046 S11,706,046 S2,406,636 S9,299,410 S11,706,046 P.E.D.C. S0 System Revenues - Cash SO Impact Fees - Cash SO Impact Fees - Debt SO unfunded SO Other Funding Sources' - SO TOTAL SOURCES S11,706,046 S11,706,046 SO SO SO SO SO S2,406,636 S9,299,410 S11,706,046 ' Explain & Identify Type of Other Sources: Project Manager: Cara Davis Project's Approval Date 3/14/2012 92 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME.> - PROJECT t PREFERENCE ORDER wwM Project 72 RoyJMax/Garden Roa1 ea-in Sewage System ww1501 12 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE> COSTS TTt'tb project proposessapproximateeTy 4,940-Get oOrir trunrsewer giongImpact on operating budget ENo 0 Yes«Below) Broadway St. from Food Town's Lift Station to O'Day Rd, approximately 1,300 feet of 15" trunk sewer along Garden Rd from Broadway to the lift Fiscal Year 2013 2014 2015 2016 2017 station and 1,200 feet of 12" sewer line along Roy / Max Rd from Total Revenue Broadway to Hickory Slough. Personnel Services Operation and Maintenanc ($11,911) Capital Outlay PROIECT,,JUSTIFICATTON:�4 , ,-. +,,,, Total Expense (S11,911) This project wilt ee—Timinate modeled overflows and two existing lift FTE Staff Total stations (Food Town s, Garden Rd.) and serve areas that are currently Cost Avoidance/Payback period Explanation: not serviced. Elimination of modeled overflows and two Lift Stations in 2015 at an estimated amount of S25,000. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION CITY FUNDED ESTIMATED PROJECT TOTAL BUDET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report $114,700 S114,700 _ S114,700 $114,700 Land/Right of way S85,000 $85,000 S85,000 S85,000 Design/Surveying S229,500 S229,500 S229,500 S229,500 Construction $1,495,000 S1,495,000 S1,495,000 S1,495,000 Equipment and Furniture $0 Contingency $373,000 S373,000 $373,000 $373,000 TOTAL COSTS S2,297,200 S2,297,200 S0 $0 S0 $0 S429,200 51,868,000 $0 S2,297,200 FUNDING SOURCES CITY FUNDED ESTIMATED PROJECT TOTAL BUDET APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds $0 w/5 Revenue Bonds $0 P.E.D.C. SO System Revenues - Cash S1,148,600 S1,148,600 S214,600 S934,000 S1,148,600 Impact Fees - Cash S214,600 S214,600 - S214,600 S214,600 Impact Fees - Debt S934,000 $934,000 $934,000 $934,000 unfunded S0 Other Funding Sources' - S0 TOTAL SOURCES $2,297,200 S2,297,200 SO S0 S0 S0 $429,200 S1,868,000 SO S2,297,200 I Explain & Identify Type of Other Sources: Project Manager: Jennifer Lee 93 Project's Approval Date:3/14/2012 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME ____________ PROJECT#_____� PREFERENCE ORDER Barry Rose WWTP Plant Expansion WW1502 13 PROJECT DESCRIPTION _ __ __ INCREMENTAL OPERATING AND MAINTENANCE COSTS Compleate Preliminary Engineering Report to_evaluteth a — e_timing and Impact on operating budget LINo LIYes(See Below) alternatives to expand the Barry Rose VONTP Plant from the existing 3.1 mgd to 4.5 mgd to serve exanding population in this service area. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel services Operation and Maintenance capital Outlay PROJECT JUSTIFICATION _ _ Total Ex ense The TCEQ rules require then initiatio of engineering and financial FTE Staff Total 1 planning to upgrade a wastewater treatment plant when the flows reach cost Avoidance/ Payback period Explanation: 75% of the plant capacity. The plant is currently treating approximately 50%of the capacity. IMIIIIIIIIIMIIIMIMIIIIE FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL Preliminary Engineering Report $450,000 4450,000 $450,000 $450,000 Land/Right of way SO Design/surveying 4900,000 S900,000 $900,000 S900,000 construction $9,000,000 S9,000,000 $9,000,000 $9,000,000 Equipment and Furniture SO Contingency S1,350,000 S1,350,000 S1,350,000 41,350,000 TOTAL COSTS S11,700,000 $11,700,000 S0 SO $o SO $450,000 $900,000 $10,350,000 $11,700,000 FUNDING SOURCES FUNDED ESTIMATED TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 PROJECT TOTAL General Revenue - Cash SO Certificates of Obligation S0 Future GO Bonds $0 w/s Revenue Bonds S3,350,000 $3,350,000 S3,350,000 53,350,000 P.E.D.C. $0 System Revenues - cash S2,500,000 $2,500,000 S2,500,000 S2,500,000 Impact Fees - Cash S0 Impact Fees - Debt S5,850,000 S5,850,000 S450,000 S900,000 $4,500,000 S5,850,000 Unfunded SO Other Funding Sources' - $0 TOTAL SOURCES S11,700,000 S11,700,000 SO SO SO $0 $450,000 $900,000 $10,350,000 $11,700,000 ' Explain & Identify Type of Other Sources: Project Manager: Skipper Jones Project's Approval Date: 3/14/2012 94 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME _-__ PROJECT I PREFERENCE ORDER wvAt Project 11 Veterans Drive Lift station Service area ww1602 14 D., aECTDESCRIPTION r: s; INCREMENTAL OPERATING AND MAINTENANCE COSTS This project defines tIe extens on of the trunk sewer south along Veterans Impact on operating budget LJrvo wes(Seeeeaw) Dr. as far as Dare Rd. with gravity sewer services follows: approximately 1600 feet of 12" line, 16680 feet of 18" line, and 4920 feet of 24" line. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue , Personnel Services _ Operation and Maintenance (S8,933) - Capital outlay PRO3ECTe3USTIFICATION - - Total Expense (S8,933) avity se This will allow grwe— ror�veT eopment_south oi'aaiTey Rd. and FTE staff Total eliminate two lift stations (Park village and Springfield). This project cost Avoidance/Payback period Explanation: will be developer driven. Elimination of two Lift Stations in 2017 at an estimated amount of S25,000. FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report S365,000 4365,000 $365,000 $365,000 Land/Right of way S73,450 S73,450 S73,450 S73,450 Design/surveying S730,000 $730,000 _ S730,000 S730,000 Construction S5,211,817 S5,211,817 S5,211,817 S5,211,817 Equipment and Furniture SO Contingency $919,732 4919,732 S919,732 S919,732 TOTAL COSTS S7,299,999 S7,299,999 S0 SO S0 S0 SO S438,450 S6,861,549 S7,299,999 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO certificates of obligation SO Future GO Bonds SO w/S Revenue Bonds S5,508,353 S5,508,353 S5,508,353 S5,508,353 P.E.D.C. So system Revenues - cash S168,550 S168,550 $168,550 S168,550 Impact Fees - Cash $269,900 S269,900 S269,900 S269,900 Impact Fees - Debt S1,353,196 S1,353,196 S1,353,196 S1,353,196 unfunded SO Other Funding sources' - SO TOTAL SOURCES S7,299,999 57,299,999 SO SO SO SO SO $438,450 S6,861,549 S7,299,999 1 Explain 6 Identify Type of Other Sources: Project Manager: Jennifer Lee Project's Approval Date: 3/14/2012 95 CITY OF PEARLAND, TEXAS 2013-2017 CAPITAL IMPROVEMENT PROGRAM PROJECT NAME .� ww03 PROJECT# _�_ PREFERENCE ORDER wwM Je Pro ct 29A JHEC w7 an rP Expansion 16 15 PROJECT DESCRIPTION INCREMENTAL OPERATING AND MAINTENANCE COSTS A 2-mgd expansion to the existing 4 mgd wastewater treatment plant that Impact on operating budget �No ❑Yes(See Below) will increase the wastewater treatment capacity to 6-mgd facility at the John Hargrove Environmental Center. Fiscal Year 2013 2014 2015 2016 2017 Total Revenue Personnel Services Operation and Maintenance, Capital Outlay PROJECT JUSTIFICATION _ Total Expense ` This 2-mgd expansion is_based on growth projections_for_the TJHEC WWTP FTE Staff Total service area and additional flows that will be diverted to the JHEC WWTP from the Longwood Service Area. cost Avoidance/Payback period Explanation: FY PROJECTED APPROPRIATIONS PROJECT COSTS ALLOCATION FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL Preliminary Engineering Report 4400,000 4400,000 4400,000 S400,000 Land/Right of way SO Design/Surveying S2,000,000 S2,000,000 $2,000,000 S2,000,000 Construction 520,347,000 S20,347,000 SO Equipment and Furniture So Contingency $2,500,000 S2,500,000 SO TOTAL COSTS $25,247,000 S25,247,000 SO S0 SO SO S0 S400,000 S2,000,000 S2,400,000 FUNDING SOURCES FUNDED ESTIMATED PROJECT TOTAL BUDGET CITY APPROP. BUDGET THRU 2012 2013 2014 2015 2016 2017 TOTAL General Revenue - Cash SO Certificates of Obligation SO Future GO Bonds S0 w/S Revenue Bonds $12,623,500 S12,623,500 SO P.E.D.C. SO System Revenues - Cash $0 Impact Fees - Cash SO Impact Fees - Debt $12,623,000 S12,623,500 $400,000 $2,000,000 $2,400,000 unfunded SO other Funding Sources' - SO TOTAL SOURCES S25,246,500 $25,247,000 SO SO $0 SO SO $400,000 $2,000,000 S2,400,000 1 Explain & Identify Type of Other Sources: Project to carryover to 2018 Project Manager: TBD Project's Approval Date 3/14/2012 96 GLOSSARY OF TERMS -A- -F- AC—An acronym meaning Asbestos Concrete. FM—An acronym meaning Farm-to-Market. ADA—An acronym meaning American Disabilities Act. FNW—An acronym meaning Far North West. ADF—An acronym meaning Average Daily Flow. FTE-An acronym meaning Full-Time Equivalent. APPROP-An abbreviation meaning Appropriation. FY-An acronym meaning Fiscal Year. AC-FT-Acre Feet -B- -G- BCDD#4—An acronym meaning Brazoria County Drainage District#4 GEC-An acronym meaning General Engineering Consultant. BNSF—An acronym meaning Burlington Northern Santa Fe (Railroad). GCWA—An acronym meaning Gulf Coast Water Authority. BW—An acronym meaning Beltway. GO—An acronym meaning General Obligation. -C- _II_ CAT-An abbeviation meaning Category. HDPE—An acronym meaning High Density Polyethylene. CDBG—An acronym meaning Community Development Block Grant. HGAC—An acronym meaning Houston-Galveston Area Council. CIP—An acronym meaning Capital Improvement Program. HVAC—An acronym meaning Heating,Ventilation,and Air CMAQ-Congestion Mitigation and Air Quality Condition. CO—An acronym meaning Certificates of Obligation. CR—An acronym meaning County Road. -I- -E- EMS—An acronym meaning Emergency Medical Service. I/I—An acronym meaning Inflow and Infiltration. EOC—An acronym meaning Emergency Operations Center. IH-An acronym meaning Interstate Highway. ESA-An acronym meaning Environmental Site Assessment. EST-An acronym meaning Elevated Storage Tank. ETJ-An acronym meaning Extraterritorial Jurisdiction. 97 GLOSSARY OF TERMS -J- -R- JHEC—An acronym meaning John Hargrove Environmental ROW—An acronym meaning Right-Of-Way. Center. RD-Road -K- -S- KPB-An acronym meaning Keep Pearland Beautiful. SBR-An acronym meaning Sequential Batch Reactor. SCADA—An acronym meaning Supervisory Control and Data -L- Acquisition. SWEC—An acronym meaning Southwest Environmental Center. LF-An acronym meaning Linear Feet. SF—An acronym meaning Square Feet. ST—Street. -M- -T- M-Million. TCEQ—An acronym meaning Texas Commission of Environmental Quality. MEP—An acronym meaning Mechanical,Electrical,and Plumbing. MGD—An acronym meaning million gallons per day. TIP—An acronym meaning Transportation Improvement Program. MUD—An acronym meaning Municipal Utility District. TOC—Traffic Operations Center TXDOT—An acronym meaning Texas Department of Transportation. -N- -U- NOI-an acronym meaning Notice of Intent. UDC—An acronym meaning Unified Development Code. UHCL—An acronym meaning University of Houston Clear Lake. -p- PD-An acronym meaning Planned Development. -V- PEDC—An acronym meaning Pearland Economic Development Corporation. VOIP-An acronym meaning Voice Over Internet Protocol. PER—An acronym meaning Preliminary Engineering Report. PISD—An acronym meaning Pearland Independent School District. -W- PSB—Public Safety Building PVFD—An acronym meaning Pearland Volunteer Fire Department. WWM—An acronym meaning Waste Water Model. WWTP—An acronym meaning Waste Water Treatment Plant. 98 a.. -;.,X' ::�; - .. r+-::- .-...........- -`-_{ .a g ! Ctett --'i -!..tP. .:#1F !mil+ ik rs 'li"-t^_ yTa^, '•; �;- _-,^' "t .. 5 ,:-.wi 7d, `, -i*. _ _ �.�AY'Y„ € __ -,ty _ _ - - _ d'ii� y'., ., t ,yam . y, r t - ., _ 3 ..KT.Tri. a:..-.. --:.+' - °9 AS s_ ".;t- 4"yi- ,r_ Y f- rrti _ eft 9 sr .! `'=1 es..y:, +.•. , ':fi J - Derr --_ i -�: :,,a,,: i. x a:; '� a. - .i "` . _ k- „s7'.;i'ri ▪,, a• 9k,s f"t= ,. •...,n, I�' ir °< - i t, -` , '`9 ,� '�,#'_a� -tom^;'r- ., °•�`- 'y?, � f . �` z-fi _, 3x i. i- .- F _ - 'Z, .'.� �, a'" - f , i 3 x : x 4:,` ''«:!''1,;' r't 5"3" `Y't9^ »a. . - fir} . 3Yr,' ¢ t-r ri . t}a F ' '<n r;r_Har�Fcac E:•StSi t .{ ` - r . -� t `*, ���, t� d`. ..0 so ,j .... s "� .r dL. :,... :"`.t d' -Y'. t',- ,a. ,'a x,' '" ai tt',,.".'i',: - *x '- ,s' ,.: w 3 .,` . Yr 2018 2,'1' T4 `,::'y` . -olss';+ r �s= .',r r ¢ X. I. :",.,1\„ . :-Leo.. -. t`+{.'' ; .. 7 -- , , - .7 _ i r1• _ _r +� f rr .f; Y*, ,'9 4,. ty .ier marAr ..6E .,f two} , i ",'M 'f ....,:. :' '-5a:,.ri:--< .-_sue. '_-rv` , �$-� ���1�� _ - ae`9-a�.3�,�4t � -4= 41,1 .'$'z.,._ �[*,. � r )::,: ',�"a. - '. fir•.°,-... .. ....__- INIIIMIIII •,.s"' m ,.. � X',� S "i'�� 4a,?^,�P.�., � .. •'-- ..r-«r .'•�.rP,., - .., z.=Ate- *r;--- - _ g't - .._ _ �� �' ` &"Y r a�-'K•7F k' k Ara Rd Widening- ,,,..,--......,,.::„...,..c..,...--,..,t', -..-.4....,,,,"*_-se , .;,..`•;.',4*,,31„.4 y. i i 2D152Q17 �i3 ;lvtn Rd ;id viing : ' `� i ' .> $� Alit' ='1 201 i01' � a ram'---`S_ .,' r i I -! p .c` fi' • y {{ li t:r }. ..•>r, 'mart 1-'! ;. 'Z'':1`'')j".__�y 4 , _ �[ 1-. •.7_ �._-_F___— - - y •.; ,;W,�. ' ^„4 `rs:. - - �` r rs. ;" s1 'J' r4 Z l I �,' 'kti= �' a r i, ismaniemosmommumminomme _________. .. a 1, �. try • # i} I tr-ri ,_"r lw a ��_ I : w.. f '�').„� ;7 Regency Par{•:SuCdiuisionPa,.ino • r ;.. "` 1 E - 77 "`, 2015-2015 e. v4. 7*'' • t CR 8d Expansion -1 ,,,,., f'. _as f ?f 201'201' ` x i i q/g# /, y ? � � d AM, " '� `�cslk �. t . "_h.'` .1-1 t ,-, f 4, _k'f, - _i, .r!„ 'i 3:` ;•, �' C_�,7 j y! ° L ' , :CR 403'Hughes Ranch 4 _ +I .:Y .� i i f 4 v % .+ r�} «� T. '� rFa a de,:.=alb, r / y k ,tea- 1 -,.. .,_. 4 i �� ��r��/+- e '" - - -,... '8• i s ` - `017 p �xand Eoule+ard Reconstruction '� �� ��" ,y . k !' t w„ x 2016 2017 frc ' Y - p 1,, «* �'' _ s „r fir' +! _"'�".•hT s--.� ` �, ,:: e» .:""_ r�;`-*. >.- - -_+ '�['''rs€ 4 x.xx r%• �� x a anew _ / /. y . ?� _ ((,,.�.�� " ''�l�ry, Y ,f •fY ..`f b .,� .I:' #. ,;i;ra u y. ,� - "iG. - x*' - _ t `X f--i`" �.3 , .. ..? t _ Y:,,,((.+A • '.k 1 w:,,,,,M }Y N4*- `,t$ •� $, cal - v+ :: a �.W` ,ry - .Yy'_ -�'` f - 1 .i, .i •wy '.•:' - ." :uc {; '. #`^ y'`' .y-�, r��r to „y- t r y i I:" .. > -$,- �, .' -, 4?' x 7 ,. - Fit :; ; + 3 9'R ,O -'r+P r+ ,`�"st '..-?, �:. A t r, ?a.` 'yfi' ;t' 2014 °'r s 3 1 n *? % a 1 • " . ,Lo , sky 3 [: £i :: _t, � r-,...r:�• „a.;„ ..mo�yt�,.,,�;, t pq_ ^; 44 ..z> ••1 ,;, +� _.'h �K.t--v h-- ;'_ A' ,g•••'. t'* .:to Jc•s„4'..{ � :,. Arta+:• { f+ t •r� "-t-2` >s :y f�i.N- , Fes" .} ..3rE X.;...,„ ; `4 .. _ 9 - +-� k = ;. i �� = e Bu;inessCerxerDr , 4 - el - •.}`I; ---A- w , , . .. Bail Rd-•�eteralstoFM1128 " `�' ` Lon nand Street Reconstruction y-ke" fi* ' II �.: :� i .. t i 2013 • I • J ' .....� ;��� 2015-2017J t w k- �l t "„ � e �' 9 ?016-2017 !fin ` r.'. ir, +,t' , !1� sz _r „"_`r;� 'f �`- >< ++J r a -•+• j,- _ _ ,,"w ry -+". :>.' •z�",a - F•,4' •4'h _ - 4 Y y°. , Y ' F ��3 4 i � i N<n, l '.1 J, 't,1 '-"-' ,?9 nil: _` ro !t °' +I" �'+" -^. ,,,,t. :+ � gg�� ■! ( � I -,>�' -fi t. ; .i� ., •-<` 01 ''#r _ !'. w -s yam. "1 - ////�� gE(�i.•r it` $'ty ` Rierr 1i t�-'d "� a,' od t':,. -ti.RY. r�``.-4 : as ♦' ..+..a, , ,.r - 1t• -'r�,.-�.. - ice'_ «3: �. ^��. .Z,A • �.. r' -r -w �'' s ea, t r f 1 �, q f 1 Pearland Pk .y ErX --.w f,r ; • } '+ti. a „ 2013 t ;...•: !:_ v" .c -.{ - {. t( ,z�► l` to Ar �,1rR • igi � 1• .�.1- Ica - • --XT 'Di i i�1" '"- t", - a+YtiR�.�f�-'., > - � - 1 #;,i k 'wr • - r tea,.,ti♦- ' -2-i D!1 d ..�C � _ '3_ y4,.,'st C.', ,-. ..V - _ ... ' _ y ' - i L. y` 4.z i'" 11 , i x Tf ��,;iFt fl.r *. ♦ .�..•y4y . 1. :.y.'rid-v'^z1 c is1� awl 1 _ f i7 ^,r u„- t.,r-V .M^.:.a rw^� 't •s ••3,. Jr. „ - . rY,:' _ r i _ � - ""s-!_s } {:G.,,+, `4p , r. 'a ''"' p i s '44 �,-,-✓ y • 'r %-.4::-x,• - _ i- t 1 .- - ; • s' F _ -+ :.'..i-.:..' -r�►. 1$•. win a 7^y -`�.c'ry f•�,. •' ar. z�. ..'... '� _ t! r.. +ti,• i � �..� ;f 'f �' � _ i. ,_ .-, ai_4' � •. °n,JO it r' r --_ ,,.� _ _..,i - -- s„io • ..i � L • @44'1 e , -• : ,z',"' i'� _- r s r<F.' r' «`+";'r'•, ✓. 7 ,, ti .. , - .J a.�,y,1al* 1t '+i' r s" _9 s' `' ' - ' - } dk. f to) �.g,� 1 ? " z1d "i t"] Y • ! yy x'_v'r: :-�.-_ 7, - _ �. 3, �,. i" rr �_ - -�.�,A. +e_ 'i: a' i :*` 4.. . - .q, `X ;,- :.- }-cf.j . ' 1 .ri, " - 1.?:".".;,:;Ar4c...t„,, f -:_i ,'fie'"'-'4 3 _s",ar ,1f a.= Yr vµf -( i 1 ,, ",. .. `,•.",{ }}` `€�1! : .r _- .,, Fr a. 6fi'.nosirt , •& .n�,`.h3_- 7: %311 a ,3 .,,* 7. ' z, a1,4 Jai _ x-lrr r^r. _ t ... 14.,. °w - t 3 - r „ .. , r ..s ,_, - .,.,._ "_ s. - s .. .-.,. a �� �-r- f,� �+^ yw,..�''1'- w. �?'�8,- �y• '�l^,.' City of Pearland rte Reed_Z,- 3 c;Aa,`•,exre-at A.111�M152017 .`e4C2- - -es _- ._. �35 z:c .:-_ !c 1fiW17 a, 201,3 - 2017 CIP r+ax a.1, M. >n-: 1X10-;0 R %- 0 , �a v, en �a1s xlsa:i7 6a}awn.tees�nab215 17 =ix� xasrax+� °� Miles S eveY-se a ena?1LS,17 rare rrN aaa. : Streets xa x 3aexsrCG 2L1E _:.a4C Nac 03?752Q77 a xaPtar&:�13 o Y ,ar'crua.raerwac.+,..+.-'.:i+ -r,ra 1 1 ize--ti?sx B vez. e,-C xlr rla ,re axc.•e_t,*Ve;, ri rgtnaCxx�+rv,t.'tx•«.ar Y:K�+r,:nraryt GIS Shadowereek Ranch Park Ph. I 2013-2 014 ShadowCreek Ranch Park Ph. II 2016-2017 a.ztr. Italbeigr wait c ea rime( tsTv+ea irr41'W miver wail 'la'i t+w ter ems City of Pearland 2013 - 2017 CIP Parks Max Rd Sccz .rC:mplexPh. 12'J12 Sports Complex at Max Rcsd Ph. I201, -2017 Hunter Part 2015 Shadc•�: Cree< Ranch Fard. Ph. 12013-2014 Max Rd Sports Complex Ph I 2013 Sports Complex at Nlax Road Ph. II 2016-201 7 Independence Psr•: Fh. 1 201E-2017 Centennial Far< F'h. II 201 -201F• Delores Fen ics: Nature Centr Ph. Shadow Creed. Ranch Pap': Ph. II 201'-2017 Centennial Park Phase II 2013-2015 Delores FenWck Nature Center Ph. I 2015-2017 ta- - Hunter Park 2015 Trail Connectivity Ph. II 2013, 2015, 2017 Trail Ccnre_cti'rity Fh. II 2013, 2015,2017 Trail Ccnrectivit;• Fh. III 2012., a15, 2017 Trail Connectivity Ph. III 2013, 2015, 2017 Independence Park Ph. 1 20.15-2 017 to i ntart'crat cite ea erd AM fit MS tier, opredferarts sit Wirtar goal ,wog retGxar.►glr.o os tea K I 36H ree room err In to edy'ard tarn, erd striders COI rPescctc.id'ailtA Wales dcc tr. tacrddu. 2 It ?v11Ies City of Pearland 2013-2017 CIP Facilities City Hall Complex Rencration 2014 Reid Library Expansion 2015 c Fire Station # 3 Reconstruction 2013-2014 (Proposed Locations Renovations 2013 Hillhouse Rd Annex PH II 23142915 Cid Police Dept Renovations 2013 Intelligent Traffic System 2013 Fire Station # 2 ' `- .' ,u,j- w.: 2016-2017 :.'r° xs+,� Fire Station 4 2 201e-2017 (Proposed Location) Fire Station 3t 1 2014-201 F. (Proposed Lc cation) Fire Station # 3 Reconstruction 2013-2014 Tr. a ceaaia l air I r.$rrat art' oxtails as vans • Pa ra 4 elan cox .1:43 s'te ar to aeat S 4' 'eta/ at.O raafro a tt. arC as :t QC4s ea;KMSit Y,er.tFya..ya✓it; and s,(Na YD e: . rra a((.a rJCi tea 'AI aes*n re citg t j tanMa WATER CIP 2013-2017 REFERENCE NO. PROJECT NAME 1 Surface } sts Plant Old City Hall &ound Storage Tars: FM 1128 letWaterline 4 CR 100 that&line F, holHard Rd 16'Waterlire Harkey Rd. from CR100 to CR128 & CR 128 from H arc ey to Vetera ns 7 Veterans Dr. Bailey Rd. to CR 128 16' W aterline 8 FM E21 Waterline (Br csovSy to tvbor ing Pcinte') 9 SH 35 Water lnefrom FM E518 to Magnolia Pesrland Pfitiy Wstasinefrom Shadycrest to 10 Dixie Farm Road 11 Fellows Lccp 12 CR 94Wat=rline 13 Grand Bauh wrdWst&Iine 14 &een Tee R ehabilitstbn 15 Hughes Ranch Road 8" Waterline City of Pearland 2013 - 2017 CIP Wa t.er YEAR OF FUNDING 2014-2017 2014 201E-2015 201E-201P. 2012-2014 201 a-201 e, 201E-1 6 2015-2016 2013-M14 2013 2014201 5 2013-2014 201 6-2017 2017 2013 tAR,iCEY RD FRO MCR103 TO CR 12+3 & CR128 FROM t•ARKEY TO VE TE i \S 2015 2 016 T-tst 1128 16"A'ATERL \E 2015 W]16 CR 100WATER_ TEE . 2V 15,-2316 LC1-ARD t 16 "p\'ATCRLi NE 231; -2014 VETEW'S DR EA :.E'Y RD TO CR 1281E "AMER_ NE 2015-2016 FM 521 'A'ATE R.. TEE EROALVA'AY TO WORM; POI %TER. 2015-2316 St:35'A'ATERL`.E FROM FM518 TO ) AGTiOLA, 2013-2014 PcARLA\D WAY 'A'ATERLNE FROM StADYCSTTO DX _ FARM RD , 2013 LOOP. 2]14-2315 CR 94 'A'ATERL \E 23132.014 �RA\D I~OL'._dARD'XATER_ \E 2016e)17 Ths vow_ sea -t,r'a! :r a :v..ras ra r'ai -a rase tee- creaxe] auar:esit_:as. r scent .arLruejrg fists tacas-,ar reamer- er:•tte-gracrdtrot, bad treaters cn a =c x et:t rea:ce c,_:an d :for/ to nere% WASTEWATER CIP 2013-2017 PROJECT rJAfv1E sinut Lift Station Eliminate Sornssets hire Lift Station r:'i Project 23 Crsnge Ntiji.vita Lift Station Retirement 'v'ikti M Frolect E' kV*. sva'Scctt SCADA Lift Station 'v`i'v'i 11:1 Project 8 'INES t Lea Fc roe. P.Isin r':1 Project 17 \' eat Oa':s Lift Station Retirement \,'v`ir':1Project 21A- Scuthdown (North CentrsI; v`i'v`iTP Ecp•3rsion NI Project 19- Brced•;:ay Trurx Sewer Extension Peas lsnd Fight; Lift Station ri..1 Project 11 Veterars Drive Lift Station Service Ares r'tHard R d Tru Sever ; r'14-4:s: a to Scuthdc.\;;n v`!v'i TF1 b`iv`i 1:,1 Project 12 Rc. t'isxiGarden Rosds Basin Sewage Sys tem 'WV,/r';IFrcject29A-JHEC v'i'v`iTP Exparsion Id Project 21 Os r B rec': Es tat Lift Station Barry Rase'W.*TF' Plant Expansion • 201? 201? 2014-2015 2012-2015 2014 201?-2014 2014-2015 2012 2014 201e-2017 2015-2017 201E-201e 201e-2017 2014 201e-2017 • 1 • • City of Pearland 2013 - 2017 CIP Wastewater =:A? &Y7-:'Carl IS a-t STA"'C:{ _ '4 VAST L :OR CS I.U.N. 27'; VAST CMS tin Stf1ON garW:h1LNT, 272120••4 a� 1.1/4.' C SC-WASST sum urn STaTncrt 20' 1 • ORAN: G1.1 1 AWal. % T SW104 XrgO'JKNTT20'420'3 SAR3{MOS:', IT,PLlNTCXCS•YSC�t20!S2J'T '. '1TAYAJR SCOTT SCAMMLFt STATCAL W1240'9 SOU TMOCYW NCWN1wCfl4SO4 :' 4020'a WRTXLIPAt4sCf{ 2c'e-::• ':.HT,lCRC SCT2"PCAA S=:• 'Z uT?.'LS.FtSTATION. 20'{ ': a..NuTLFtSTATcx 20• MID a.Zni.vTRW NC S::.St: 1.--ICTCr1SCr't2a11 '.c.•A..1.0'RWr,Ks:,JCAAtTYKWtWATOSOUTMOC?fl '..-- :- :• .:7;v4 %}7511ASH S:WA= rest am 2a'S2a'e Va tVA,SWit tar STX ONSCA.,CARIA2a'a-2a'.T -::• 0 0.5 1 N 2 1 Miles itTs :rcai sea :-tr'"Mtt'-e' 7er:•32 end ray rat rare teen 7e: ear ':r a :it Lt! _'e tr ece: e- -eerrq a site, rig :L :c.5 S t cc -c: rejeSe- r c•Tte-Qrose Live; re r_; ese 5 :in :Y e=rCX ne:e re e:t e c 2:c. i a' :r 0•:?:, xi -Antares GIS