R2001-0044 03-26-01 RESOLUTION NO. R2001-44 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING A CHANGE ORDER WITH HADDOCK CONSTRUCTION FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE DAVID L. SMITH SITE EAST POND DETENTION BASIN. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order by and between the Cit of Pearland and Haddock Construction, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute a change order with Haddock Construction for construction services associated with the David L. Smith Site East Pond Detention Basin. PASSED, APPROVED and ADOPTED this the 26 day of Hatch A.D., 2001. MAYOR ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY RECEIVED CITY Of' PEARLANO CITY Sr_C,.~_TAR'~ S OFFIC?; David L. Smith Site - 2001 NAR 27 AH 9:1,5 East Pond Regional Detention Basin B2000-036 CHANGE ORDER NO. 1 March 14, 2001 ADD THE FOLLOWING WORK ITEM: 1. Increase the depth of excavation of the detention basin to elevation 18.50 in accordance with the revised grading plan attached as "C.O. No. 1 Exhibit A.~ Place the excess material on the planned disposal areas as directed in Alternate 2B. Amount of Item 1. 38,800 c.yds. @ $2.25/c.y. ADD: $87,300.00 2. Install 12" thick precast manhole bottom in lieu of specified 24" thick cast-in-place bottom. In addition, 9" of cement-stabilized sand compacted fill must be installed below the 12" precast bottom immediately before placing the pre-cast bottom. Exceptional care must be taken to insure that the pre- cast bottom is set accurately to design grade, and is set before the cement sand has hardened. Amount of Item 2. NO CHANGE: 0.00 3. Change the profile of the weir wall i~ accordance with the attached ~C.O. No. 1 Exhibit B'. Amount of Item 3. Deduct 2 cu.yds. @L.S. DEDUCT: 150.00 TOTAL Change Order No. 1 ADD: $87,150.00 CHANGE IN CONTRACT TIME (Calendar days) ADD: 12 days TOTAL CONTRACT B-MOUNT IS INCREASED $87,150 TO $1,256,745.00 EXCAVATION AND EMBANKMENT CONTRACT TIME IS INCREASED 12 CALENDAR DAYS TO 72 CALENDAR DAYS. TOTAL CONTRACT TIME OF 180 CALENDAR DAYS IS UNCHANGED. END SHEET ONE OF TWO B0036CO1.WPD (Cont.) Sheet 2 of 2 This Change Order No. 1 to Contract B2000-036 is effective March 14, 2001. [i0~ OWNER CONTRACTOR y of Pearland Haddock Construction, Inc. ~ g~7 r END CHANGE ORDER NO. 1 (SYM.) 43.47 35.64 10' 5' i i i 5' 10' 1 V 40.00 n V 42.00 6'-6" (SYM.) 43.47 35.64 - L _VATI O SCALE: 1 "=5' 1' X 1' BLOCK OUT OPENING ST D W City of Reatland, Texas EXHIBIT V CHANGE ORDER NO. 1 B2000-036 _3oolc HORZ:1'-5 M 1_ cm, nut 00-4000h Job Hoa Da$.:FEB.. An w-J.E. Chid er J. 2000 B. HARGROVE SHEET 1 OF 1 ct .38 57 REF. PT. 604 13,781,725.41 154,910.84 40.20 .) Exiji8ir 4 ((h6.5 577E-r io#N0 Utail Gap 2/a/00 N57' 22 3"E NOTE: CURVE ALL CORNERS TO SHARPNESS TO ALL SLOPE INTERSECTIONS, HOWEVER TH - REQUIRED E CAVATION MUS REMAIN THEAME (TYP ) 43. \ 3,781,.7.56 er 3,155,412.63 155,185 AREA "A" CORRIGAN CONSULTING INC. WETLAND DELINEATION (DO NOT ENCROACH) • 1 75 E 3,155,635.17�---_`, N 13, 30,659.09 �\ E 3,155,773.�9�1 REF 13T. 54 ,N 13,7 0,649.5• E 3,1 , 631.65 4, PROPOSED LEVEE (LINE REF. BY nrA rd.,.... .. _ o • N 13,780,967. E 3,156,1 10.8 \ �`— N 13,7E E 3,156 )/‘ B0036CO1.WPD (Cont.) Sheet 2 of 2 This Change Order No. 1 to Contract B2000-036 is effective March 14, 2001. OWNER ity of Pearland Alan Muel er, CONTRACTOR Haddock Construction, Inc. Int. City Mgr. M.rk Haddock, Contractor END CHANGE ORDER NO. 1