R2001-0033 03-12-01 RESOLUTION NO. R2001-33
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, APPROVING A CHANGE ORDER WITH LEM CONSTRUCTION
COMPANY, INC. FOR CONSTRUCTION SERVICES ASSOCIATED WITH
THE EXPANSION OF THE LONGWOOD WASTEWATER TREATMENT
PLANT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That certain change order by and between the City of Pearland and
LEM Construction Company, Inc., a copy of which is attached hereto as Exhibit "A" and
made a part hereof for all purposes, is hereby authorized and approved.
Section 2. That the City Manageror his designee is hereby authorized to execute
a change order with LEM Construction Company, Inc. for construction services associated
with the expansion of the Longwood Wastewater Treatment Plant.
PASSED, APPROVEDandADOPTEDthisthe. 12 dayof March ,
A.D., 2001.
TOM REID
MAYOR
APPROVED AS TO FORM:
DARRIN [/I. COKER -
CITY ATTORNEY
CHANGEORDERNO. 3
Owner: City of Pearland, Texas Date Prepared: February 28, 2001
Project: Long~vood WWTP Expansion (1.75 mgd to 2.50 mgd)
Owner's Contract No. B98-052 Contractor: LEM Construction Company, Inc.
Date of Contract Start: February 1, 2000 $ 1,683,040.00
You are directed to make the following changes in the Contract Documents. Description:
Remove existing jib crane, furnish and install headworks screening conveyor, power and controls, discharge chute, and all necessary
supports. Fumish and install stainless steel plate partition in splitter box. Contractor's Proposal No. 4 for the Work is atlached. The
revised Completion Date is based on assumed 3/08/01 Contractor Notice to Proceed date.
Reason for Change Order:
Requested by Owner to improve the function of the facilities.
CONTRACT PRICE CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original: $1,683,040.00 Original: 300 300
Previous C.O.s (ADD/DEDUCT): $ 37,792.34 Previous C.O.s (ADD/DEDUCT): NA 15
This C.O. (ADD): $ 90,978.72 This C.O. (ADD): NA 100
Contract Price with all REVISED: NA 415
approved Change Orders: $1,811,811.06 Original Completion Date: 11/27/00 11/27/00
Revised Completion Date: NA 6/15/01
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)
ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above,
there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED:
Engineer (Au~orized Sig~ture) Date
APPROVED:
By:
~er (Authorized Si~a~re) Date
ACCEDED:
C~act0r (Au[hod~a~re) Date
Klo~ Associates, Inc.
Project No.21801
CO-3
Page I of 1
PROPOSAL NO. 4
SUBMITTED BY: LEM Construction Company, Inc. DATE: 2/22/2001
PROJECT NAME: Lonqwood Wastewater Treatment Plant Expansion
PO NO.: 200710
REFERENCE: Install conveyor & Chute & Partition Wall at Splitter Box
The undersigned is furnishing the following price proposal for the work requested. Please sign and return to convey
your acceptance. I understand I am not authorized to perform this work until receipt of a duly authorized Change
Order or Work Change Directive.
ITEM NO. DESCRIPTION DAYS COST
I Install conveyor, Chute, and structural steel chute 21 $90,978.72
supports. Install Metal Partition in Splitter Box.
Bypass or D~/ers~n Pumpk~g of ~ne Sp~er Box Js not inctuded in ~h~s
quotation. Four flow shutdowns are r~lu~red to ~nsta/l fl3e Pattifio3 Wall.
TOTAL 21 ,90,978.72
SUBMITTED: LE~P~IY, INC. DATE~/E~/o/
REVIEWED:
PROJECT REPRESENTATIVE BOB HOLT DATE
REVIEWED:
ENGINEER: KLOTZ ASSOCIATES. INC. DATE
APPROVAL:
CITY ENGINEER JOHN W. HARGROVE, PE DATE