R2011-117 - 2011-09-26RESOLUTION NO. R2011-117 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING AND ADOPTING THE FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM (CIP) 2012-2016. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City Council hereby adopts the Five -Year Capital Improvements Program (CIP) 2012-2016 attached hereto as Exhibit "A". PASSED, APPROVED, AND ADOPTED this 26th day of September, A.D., 2011. ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR City of Pearland, Texas Capital Improvement Program 2012-2016 PAGE INTRODUCTION i -iv SUMMARIES Total Summary 1 FY 2012 CIP by Funding Source 2-9 Project Detail Page Location 10-13 DRAINAGE PROJECTS Five -Year Summary .14 Map.. . 15 Project Detail 16-22 CITY'OF PEARLAND :2012 20.16 CAPITAL TEMP TA$LEy PARKS PROJECTS Five -Year Summary 23 Map 24 Project Detail 25-34 NT°PRO(RAM (CIP) ONTENTS PAGE FACILITIES PROJECTS Five -Year Summary 35 Map 36 Project Detail 37-46 STREETS PROJECTS Five -Year Summary 47 Map 48 Project Detail 49-63 WATER PROJECTS Five -Year Summary..........._..... _ ._.".. _ 64-65 Map 66 Project Detail 67-87 HIEN CAPITALPRO;CRAM (CIP) CONTENTS PAGE WASTEWATER PROJECTS Five -Year Summary 88-89 Map 90 Project Detail 91-109 APPENDIX Glossary of Teiins 110-111 INTRODUCTION The City of Pearland's Capital Improvement Program (CIP) has been developed in order to further our commitment to the citizens of Pearland by working to meet today's needs, as well as those of the future. From work on underground water and sewer lines to more visible projects such as street paving and extensions, the five-year CIP addresses the needs of the City through responsible City Government with a comprehensive and cost-effective approach. What is a Capital Improvement? A capital improvement is a major, non -routine expenditure for new construction, improvements to existing buildings, facilities, land, streets, storm sewers, and expansion of the City's park system to name a few. A capital improvement project has a relatively high monetary value ($100,000+), long -life expectancy, and results in the creation of an asset or extends the life of existing assets. The cost of the capital improvement includes design, legal fees, land, operating equipment, furniture, construction, etc. that is necessary to put the asset into service. A capital improvement project is not the purchase of a piece of equipment such as a fire truck, vehicle, etc. What are the benefits of a Capital Improvement Program (CIP)? A long-term capital improvement program has many obvious benefits derived from its organized approach to planning projects. The program can focus attention on community and City goals and needs, allowing projects to be prioritized based on need. The CIP can be an effective tool for achieving goals set forth in the City's Comprehensive Plan, as well as the City's various master plans. Through proper planning, the need for bond referendums, bond issues or other revenue production measures can be foreseen and action can be taken to fund the projects as identified. CIP DEVELOPMENT PROCESS The development of a capital improvement program is a continual process and, consequently, should be viewed as a working document. Therefore, while the document covers a five-year planning perspective, it is revised every year in order to accommodate new projects, reflect changes in ongoing projects, and extend the program an additional year. The first year of the plan is incorporated into the annual budget to appropriate funds. Improvements identified in subsequent years are approved only on a planning basis and do not receive expenditure appropriation. Cost estimates for years two through five are also for planning purposes only, to be used in conjunction with the City's Tong -range financial plan for operations, As City projects related to Drainage, Streets, Parks and Facilities in the previous bond programs are completed, projects in future years are added in order to identify and quantify future needs. These projects are typically added to the Five -Year CIP as an unfunded project. These identified projects will then become a basis for the preparation of a future referendum. Projects included in the five-year CIP are either City managed projects, or include just the City's share of projects that will be managed by other agencies. If an outside agency will be contributing funding directly to the City for a project that the City will manage, then that cost and funding are included in the project budget. The Five -Year Capital Improvement Program (CIP) includes all capital projects, which are to be financed in whole or in part from funds subject to control or appropriation by the City. Therefore, the CIP includes bond appropriations (general obligation, certificates of obligation and revenue bonds), General Revenue — Cash, P.E.D.C., System Revenues — Cash, Impact Fees, and any Federal, State or private foundation grant funds received by the City for capital improvement projects. The City considers input from the citizens, the Planning and Zoning Commission, City staff members, and master plans in the Capital Improvement Program's preparation. A project list is compiled, prioritized by year, and cost estimates assigned. The Finance Department also looks at the overall effect of projects, including the need to issue debt, potential impact on the tax rate, and operations and maintenance impact on the City. The City Council, through workshops, reviews the draft with any recommended changes incorporated into the final document. A final draft of the Five -Year CIP is then prepared for Council consideration and approval. Upon Council adoption, the five-year CIP document is reproduced and distributed for implementation of the program. 2012-2016 CAPITAL IMPROVEMENT PROGRAM The Five -Year Capital Improvement Program for 2012 to 2016 totals $262,313,143. How is the Capital Improvement Program funded? Funding for CIP projects are derived from various sources including General Obligation Bonds, Certificates of Obligation, Water & Sewer Revenue Bonds, Impact Fees, General Revenues, System Revenues, P.E.D.C., Federal and State Highway Funds, and Grant Funds. Projects identified as unfunded will be considered as part of a future bond referendum. Uses of the funding include Drainage, Streets, Facilities, Parks, Water, and Wastewater projects. The graph on the following page provides a breakdown of the funding sources and uses. ii 2012-2016 CIP by Funding Source - $262 Million Bonds - future sale 1% Other Funding Sources 5% Unfunded 24% Impact Fees - Debt -- 7% Impact Fees - Cash 2% General \ Revenue -Cash 0% ++ 4 • 44444 444444 4444444 44,44444 4444444,4 iii,♦,,,,• 44444•••• +4+,,44• Certificates of - Obligation 10% AGO Bonds 25% W/S Revenue System - Bonds Revenues- 22% Cash 4% 111 2012-2016 CIP by Project Type - $262 Million Streets 40% Facilities 8% • •4 4444 4444 444444• 4+N+++4 44444444• 4.4444••44 4444+444, ,4,,,• ,,,, 44••44••4 4••444.4• 444,4+,,, 4444,••4 •44,44, 444••4 4444 44 Parks 10% Drainage 7% Water / Sewer 35% PROJECT HIGHLIGHTS DRAINAGE Drainage projects include the construction of storm sewers, detention ponds, and underground drainage. These improvements will help reduce the risk of repetitive flooding in residential areas and provide storage capacity. Major drainage improvements include Hickory Slough Detention at Max Road, D.L. Smith Detention Pond Expansion, and Cullen/FM518 Regional Detention Pond. PARKS Parks projects include the development of Trail Connectivity broken down in three (3) phases. Phase I, currently under construction, will connect Centennial Park to FM 1128, Phase II will connect Centennial Park to Independence Park and for Phase III Independence Park to FM 518. Also included are the construction of the Max Road Sports Complex Phase 1 for six international sized soccer fields, Shadow Creek Ranch Park Phase I which will be a multi-purpose sports complex, improvements to Independence Park, Centennial Park, and Hunter Park and construction of a Nature Center. FACILITIES Facility projects include Traffic Signal Communications Network which will include upgraded controller equipment, Pan/Tilt/Zoom (PTZ) cameras, the installation of fiber optic and wireless communications, plus traffic management software for the City's network of traffic signals, the reconstruction of Fire Station #3 to house personnel from Fire and EMS, including dorm space, kitchen and dining area, day room and exercise room, the renovations of the Old Police Department Facility to accommodate relocating several departments from the City Hall Complex. Also included in facility projects are: Hillhouse Road Annex, the construction of a West Side Library Store Front on the west side of the town, and the expansion of the Tom Reid Library. STREETS Street projects include pavement rehabilitation, which replaces sections of existing failed pavement, road extensions, widening and reconstruction of some of the major streets in the City to improve mobility, congestion, and ride -ability. Major street projects include Bailey Road improvements, Old Alvin Road widening, McHard Road extension, Mykawa Road widening (BW8 to FM 518), Pearland Parkway extension, Longwood Street reconstruction and Grand Boulevard reconstruction. WATER/WASTEWATER Water and Wastewater projects include the construction of water and sewer lines, water wells, and treatment capability. Major projects include the design and construction of a Surface Water Plant, Old Alvin Road Water Line, installation of McHard Road 16" Waterline, Fellows Loop, and SH 35 Waterline from south of Magnolia Road. Also included is the rehabilitation of Barry Rose Wastewater Treatment Plant, Twin Creek Regional SCADA Lift Station, Hatfield Basin Trunk Sewer Line, Southdown WWTP expansion, Mykawa/Scott SCADA Lift Station, extension of the trunk sewer at Veterans Drive Lift Station service area, installation of McHard Road Trunk Sewer and the design of Project 12 Roy/Max/Garden Roads Basin Sewage System. iv CITY OF PEARLAND 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM TOTAL SUMMARY DRAINAGE SPARKS (FACILITIES iSTREETS (WATER WASTEWATER 'TOTAL SOURCE QF,FU General Revenue - Cash Certificates of Obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees - Cash Impact Fees - Debt Unfunded Other funding sources Plus Bonds To Be Sold In Future Year TOTAL 6 417,996 2 878,862 620,000 1,030,718 5,960,531 9,880,810 14"L, 1173+,ti�ji!%(:j 2,383,000 7,553,299 4,715,433 2,173,498 5,001,507 1,419,105 26,788,917 $ 23,245,842 2Q`14 31*Gu 6,117,188 5,187,394 7,622,423 4,773,000 6,554,754 2,509,933 $ 32,764,692 $ 949,724 2,693,652 3,978,400 34, 966, 382 7,627,734 10,169, 070 60,384,962 2,179,540 7,444,829 3,780,100 60,907,478 21,742,204 23,074,579 $ 119,128,730 18,047,448 25,758,036 20,716,356 103,851,076 46,886,730 47,053,497 $ 262,313,143 100,000 200,000 625,000 925,000 550,000 4,009,433 13,613,747 1,559,583 5,861,200 25,593,963 3,931,869 11,598,247 7,265,424 11,507,152 31,341,360 65,644,052 6,632,807 3,836,635 1 3,600,118 12,307,930 30,081,771 56,459,261 1 5,088,507 1,034,564 1 1,611,495 1,259,880 1,015,538 10,009,984 500,000 186,190 1 554,299 1,394,668 1,745,741 4,380,898 1,541,668 1,363,223 2,672,754 1,810,628 11,840,050 19 228,323 302,718 230,098 912,372 24,284,801 36,724,829 62,454,818 5,186,770 2,580,000 3,696,513 2,612,746 14,076,0291 3,540,815 1 $ 23,734,339 $ 24,938,390 $ 34,126,722' $ 57,362,388 $ 118,610,489' $ 262,313,143 Note: The totals do not tie by year as the City anticipates appropriating funds for GO Bond projects in one year and then selling the bonds in the next year. 1 FA1202 ProtectgNo CITY OF PEARLAND 2012 PROJECTS BY FUNDING SOURCE CERTIFICATES OF OBLIGATION ;g;,ININPct Nam,el,1 FACILITIES West Side Library Store Front CERTIFICATES OF OBLIGATION TOTAL 2 Sub -Total 550,000 $550,000 $550,000 'FF ilimbh P CITY OF PEARLAND 2012 PROJECTS BY FUNDING SOURCE FUTURE GO BONDS TR1203 TR1201 �I,i•i,J:U ?'J roectiNamei 5" ui-i r"♦;y'Euy�i�it �,�'1'I_ i't�ii� i }C,' . � ; i:�Ui Shy.,.,lsr,i;vm 7.., ''i 7�i�7i`,rtrF1Okin STREETS Pearland Parkway Extension CR 403 (Hughes Ranch Road) Sub -Total DRAINAGE DR2003 Hickory Slough Detention at Max Rd. Phase 1 Sub -Total P20005 P20002 FUTURE GO BONDS TOTAL PARKS Max Road Sports Complex Phase I Shadow Creek Ranch Park Phase 1 3 Sub -Total 160,000 393,000 $553,000 1,043,708 $1,043,708 2,267,650 67,511 $2,335,161 $3,931,869 IWA1201 IW1N1101 IWW1004 IW/S REVENUE BONDS TOTAL CITY OF PEARLAND 2012 PROJECTS BY FUNDING SOURCE W/S REVENUE BONDS McHard Road 16" Waterline Sub -Total WASTEWATER WWM Project 7 Twin Creek Regional SCADA Lift Station & Basin Rehab Barry Rose WWTP Rehabilitation 4 Sub -Total 1,625,005 $1,625,005 2,007,802 3,000,000 $5,007,802 $6,632,807 CITY OF PEARLAND 2012 PROJECTS BY FUNDING SOURCE SYSTEM REVENUES -CASH iI WA1207 WA0809 WA1205 WA1206 WA1204 WA1203 WA1102 WA1101 WW1202 WATER Pearland Parkway Waterline Extension Bellavita Waterline East Orange Street Water Line Pearland Parkway Waterline from Shadycrest to Dixie Farm Road Water Loops Fellows Loop SH 35 Water - South of Magnolia Road Old Alvin Road Water Line Sub -Total WASTEWATER WWM Project 19 - Broadway Truck Sewer Extension WW1103 WWM Project 2 Hatfield Basin Trunk Sewer Line IWW1004 Barry Rose WWTP Rehabilitation SYSTEM REVENUES - CASH TOTAL 5 Sub -Total mou; 190,366 202,000 152,060 82,100 596,063 101,000 260,019 806,891 $2,390,499 18,008 2,300,000 380,000 $2,698,008 $5,088,507 WW1201 CITY OF PEARLAND 2012 PROJECTS BY FUNDING SOURCE IMPACT FEES - CASH WASTEWATER WWM Project 13A - Southdown (North Central) WWTP Expansion 500,000 Sub-Totall $500,000 IMPACT FEES - CASH TOTAL $500,000 6 CITY OF PEARLAND 2012 PROJECTS BY FUNDING SOURCE IMPACT FEES - DEBT (WA1201 V WA1101 IMPACT FEES - DEBT TOTAL `;hrojecf{Name WATER McHard Road 16" Waterline Old Alvin Road Water Line 7 Sub-Totall ;inoun; 541,668 1,000,000 $1,541,668 $1,541,668 CITY OF PEARLAND 2012 PROJECTS BY FUNDING SOURCE UNFUNDED UNFUNDED TOTAL 8 Sub -Total 302,718 $3U2j'18 $302,718 CITY OF PEARLAND 2012 PROJECTS BY FUNDING SOURCE OTHER FUNDING SOURCES DR1201 DR2003 DRAINAGE Westchester Circle Drainage and Sidewalks Hickory Slough Detention at Max Rd. Phase 1 Sub -Total PARKS P20002 (Shadow Creek Ranch Park Phase 1 1 Sub -Total T50071 /FA1203 FA1201 FACILITIES Hillhouse Road Annex Service Center Modifications Sub -Total STREETS TR0811 1Business Center Drive Sub -Total WATER WA1001 General Engineering / CIP Administration WA1101 10Id Alvin Road Water Line Sub -Total WW1203 WW1103 WASTEWATER Walnut Litt Station WWM Project 2 Hatfield Basin Trunk Sewer Line Sub -Total OTHER FUNDING SOURCES TOTAL GRAND TOTAL ALL FUNDS 9 365,411 2,480,000 $2,845,411 18,000 $18,000 35,000 35,000 $70,000 175,000 $175,000 100,000 303,359 $403,359 115,000 1,560,000 $1,675,000 $5,186,770 $23,734,339 rqjecta DR2003 DR2002 DR1103 DR1301 DR1201 DR1401 DR1402 P20006/P50072 P20005 P20002 P50071 P20001 P20004 PK1501 PK1401 PK1502 PK1601 FA1002 FA1302 FA0905 FA0904 T50071 / FA1203 CITY OF PEARLAND 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL PAGE LOCATION e /,� n x{?•I I a �" Pi ECt`N;a,1T,,1,;!' .( NSU; :'Vi=i. Hickory Slough Detent on at Max Rd. Phase I D.L. Smth Detenfon Pond Expansion Phase I Cullen/FM 518 Regional Detention Pond 'Old Townsite Drainage (Westchester Circle Drainage and Sidewalks 'Piper Drainage and Sidewalks 'PER for Future Bond Referendum Trail Connectivity Max Road Sports Complex Phase I Shadow Creek Ranch Park Phase I Centennial Park Phase II Independence Park Phase I Delores Fenwick Nature Center Phase I Hunter Park PER for Future Bond Referendum Sports Complex at Max Road Phase II Shadow Creek Ranch Park Phase II Traffic Signal Operations Improvements Fire Station #3 Reconstruction Old Police Department Renovation City Hall Complex Renovations Hillhouse Road Annex 10 16 17 18 19 20 21 22 25 26 27 28 29 30 31 32 33 34 37 38 39 40 41 CITY OF PEARLAND 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL PAGE LOCATION 'MS , �,'Sii,r,,. m(: w . ;}t i' ?f.;ll.il;j="j t i r ,,,I rh i!:'' - 4,t .ii,{� ,d ..:. , .i a. tih �1 :gin Vjk i; r tin, �h4 . n^�� .ea ".......�p'4JeatN.p,,�,'�,:,,n.,fb....,4�,��: �;l�:ik�iuli,.,' c?'�'�i:r�n,:�.m 'P. ,����u-+,�„+�uy,a;+�*�a�:i�#�<tm 'rtr�eeta,iUage_; ,,,.. ''� ,. r , �;r. ,r.,ojec Names. , . : � , FA1101 Fire & EMS Administrative Building 42 FA1201 Sery ce Center Modifications 43 FA1202 West Side Library Store Front 44 F20002 Tom Reid Library Expansion 45 FA1601 'Fire Station #2 46 TR0811 (Business Center Drive 49 TR1201 SCR 403 (Hughes Ranch Road) 50 TR1203 Pearland Parkway Extension 51 TR1202 Sidewalk Installation 52 TR1301 Fite Road 53 TR1302 Max Road 54 TR0803 Old Town Area Sidewalks 55 108002 Bailey Road - Veterans to FM 1128 56 T68976 Mykawa Road Widening (BW8 to FM 518) 57 TR1401 PER for Future Bond Referendum 58 TR1405 IMcHard Road Extension (Mykawa Road to Cullen Parkway) 59 120002 (Old Alvin Rd Widening (Plum Street to McHard Road) 60 TR1501 'Regency Park Subdivision Paving 61 TR1503 'Longwood Street Reconstruction 62 TR1504 (Grand Boulevard Reconstruction 63 WA1001 General Engineering / CIP Administration 67 WA0809 Bellavita Waterline 68 11 as WA1101 WA1207 1 WA1201 1WA1102 WA1203 WA1204 WA1206 1 WA1205 WA0812 WA1301 WA1302 WA1303 WA1401 WA1501 WA1502 CITY OF PEARLAND 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL PAGE LOCATION WA1503 WA1504 WA1505 WA1507 IWW1004 „o'jec; ?MP alga Old Alvin Road Water Line Pearland Parkway Waterline Extension McHard Rd. 16" Waterline. SH 35 Water - South of Magnolia Road Fellows Loop Water Loops Pearland Parkway Waterline from Shadycrest to Dixie Farm Road East Orange Street Water Line Surface Water Plant Old City Hall Ground Storage Tank SH35 Waterline from FM518 to Magnolia CR 94 Waterline Green Tee Rehabilitation FM 1128 16" Waterline CR 100 Waterline Harkey Rd. from CR100 to CR128 & CR 128 from Harkey to Veterans. Veterans Dr. Bailey Rd. to CR 128 16" Waterline FM 521 Waterline (Broadway to Mooring Pointer) Grand Boulevard Waterline - Old Townsite Southeast Quadrant Barry Rose WWTP Rehabilitation 12 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 1 85 86 87 91 CITY OF PEARLAND 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL PAGE LOCATION WW1101 WVV1103 WW1201 WW1202 WW1203 IWW1301 WW1302 WW1304 WW1303 WW1401 WW1403 WW1402 WW1501 WW1502 WW1503 WW1504 WW1505 WW1601 r91ect1Tl40e1FDetail;, WWM Pro ect 7 Twin Creek Regional SCADA Lift Station & Basin Rehab 92 WWM Project 2 Hatfield Basin Trunk Sewer Line 93 WWM Project 31A - Southdown (North Central) WWTP Expansion WWM Project 19 - Broadway Trunk Sewer Extension Walnut Lift Station WWM Project 33 Orange Mykawa Lift Station Retirement WWM Project 5 Mykawa/Scott SCADA Lift Station WWM Project 17 West Oaks Lift Station Retirement Eliminate Somersetshire Lift Station VVWM Project 21 Oak Brook Estates Lift Station WWM Project 8 West Lea Force Main Pearland Heights Lift Station WWM Project 11 Veterans Drive Lift Station Service Area McHard Rd Trunk Sewer (Mykawa to Southdown WWTP) WWM Project 12 Roy/Max/Garden Roads Basin Sewage System WWM Project 22 - Miller Ranch Rd. SCADA Lift Station Barry Rose WWTP Plant Expansion WWM Project 29A - JHEC WWTP Expansion 13 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 ;;Red &ONO' DR2003 DR2002 DR1103 DR1301 DR1201 DR1401 DR1402 til 14., Ind4i t , Ms) ject;Name, CITY OF PEARLAND 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM DRAINAGE I4 rr;r,;Oj sS9 m12012:j Hickory Slough Detention at Max Rd Phase I D.L. Smith Detention Pond Expansion Phase I Cullen/FM 518 Regional Detention Pond Old Townsite Drainage Westchester Circle Drainage and Sidewalks Piper Drainage & Sidewalks PER for Future Bond Referendum TOTAL 122,924 724,000 2,598,000 659,000 1,929,200 826,800 365,411 589,988 1,000,000 $ 6,417,996 $ 2,383,000 $ 6,117,188 $ 949,724 sl li 6,052,585 2,179,540 2,302,464 4,322,000 3,415,000 365,411 589,988 1,000,000 $ 2,179,540 $ 18,047,448 I>:tt'i7iiil:hi : �l; lil' I;1 4tr.1 !�,'.`fii` 'SO,IJR'CEc�oFtEU',NDS;>f.;! ffi � General Revenue - Cash Certificates of Obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees - Cash Impact Fees - Debt Other Funding Sources Plus Bonds To Be Sold In Future Year (TOTAL }7201'2 .13 (I 659,000 4,176,188 1,043,708 4,252,877 1,941,000 2,845,411 $ 3,889,119 $ 4,911,877 $ 6,117,188 4201;5 826,800 1 $ 826,800 1 $ Note: The totals do not tie by year as the City anticipates appropriating funds for GO Bond projects in one year and then selling the bonds in the next year or vice versa. 14 Ny 5,661,988 1,335,618 8,573,203 2,845,411 966,846 1,335,618 $ 18,047,448 INO 104 104 we mit ask ma s A'o(AI13 5wh'e of Pestle d l a 2016 c1IL» inauge, Hickory Slough Detention at Max Rd Phase 1 2012 -Sae WON .� Piper Drainage & Sidewalks 2014 III Loma I 111 Cullen/FM 518 Regional Detention Pond 2013-2014 Cullen/FM 518 Regional Detention Pond 2013-2014 Hickory Slough Detention at Max Rd Phase 1 2012 David L Smith Detention Exp. Phase 1 2015-2016 1111.11111 al Piper Drainage & Sidewalks 2014 Westchester Circle Drainage & Sidewalks 2012 This product is for informational purposes and may not have been prepared for or be suitable for legal, engineering, or surveying purposes. It does not represent an on -the -ground survey and represents only the approximate relative location of property boundaries. THIS PAGE INTENTIONALLY LEFT BLANK 15 CITY OF PEARLAND, TEXAS PROJECtAAMEo:!aflillL041'ilthOHOWI*W4P4 Hickory Slough Detention at max Rd. Phase I This project is intended to provide approx. 248 ac -ft of detention along Hickory Slough. The project will include a wier, pump station, and will L, designed to accommodate for a concurrent project use, a sports field complex on the basin floor. Phase 1 will consist of approximately 153 Acre Feet. Phase II krill expand the detention an additional 95 ac -ft to an ultimate total of 248 ac -ft. OkOJE'Oeyi0EitATIONWeinWftarnidgrdeg*I2PillggfaMOIM4, YaFaie- weathereventscurrently inundate and flood residential neighborhoods in the vicinity of Hickory Slough. The project will all_ for detention along the slough to lower the level of the slough during 10 and 100 year events. Additionally, the athletic/sports use will be a concurrent use for this site. 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM iirtafeTT#,PiWW141-4WititilitteWiPiltStittgtffittittWIL520444j6iEththlill DR2003 i 1 114k2k1201qWWW1012JiMagjA6OPER4TtNeljAND$MAINTENNCEXOSISIP2AkWig6ajj4thjWgPaga&W 2012 2013 1 2014 2015 2016 $7,0341 $7,034 $7,034 $7,034 Expenditures Personnel Services supplies Services & Charges Capital outlay Total FTE Staff Total $0 Use of existing staff, not additional $4,500 $4,500 $4,500 $11,534 511,534 511,5341 wif,!;m1011,Tilgolimipwwwil 114 . !i unoDworegli4ob cluliN! 1f1,-igW6IP apAiwitti-lip4Iiiiltii,ititiii0A0k Oli,W&Lfrolgts442116cATickloi4 it 1,4ilaaPhiii 14!ffi ii1-4f4;:ral IIMIkOmiENgq 111*Iii,14:Jikil ,Aligagibigtatiliteiniliff Equyitaill ktOTALIG:BuDalthy Ili hrwhaiS61414 aliii6i36#414 ikrakuilizoiLi:, Preliminary Engineering Report $109,566 $109,566 $109,566 $109,566 Land/Right of Way Design/Surveying $497,415 $497,415 $497,415 Construction $5,430,800 $5,430,800 Equipment and Furniture contingency $621,785 $621,785 TOTAL COSTS $6,659,566 $6,659,566 $606,981 $4,500 $11,534 W TROJ,ECTERIARRIWRIATIPNSMAggftildiallftPargiSAID4nlakaMAVOgi WOMMIPOWIMPOPPIMWSP4014WROONOW01 giii40 4121 4', '46 ma (0 P..20 41l,,fiL.2015(MU 0.,:2016ring fokoVE0-64 cr&E $109,566 $0 $497,415 $497,415 $5,430,800 $5,430,800 $0 $621,785 $621,785 $606,981 $6,052,585 $0 $0 $0 $0 $6,659,566 .itiq60;15.hillgliigAillilwrihoahlilit*IiihillAgIti-la,nat44Nia!iiiiiiW,IM,WihMIRPICautmgag,n6W,ItittitrOgAgIgLVISIffi4giniliNifrNAhgPqmairlqh-qAitTlig 40Ahil ii,rtf]PrIFYI] 4NiNeVirir 1.1111M4665114eNktir4069,F ainke PrOMPI !IBMS larif Pala" mom so itA rosieits t '12010 Pisilifriblatht Afidli013AIS 20144hro tht020 53,114 willii20.10r. 4:1PROJECr&TOTA :iilVOTASUDGETI, !UU� :Jig; , n t130 GETI ; THRUV: $0 $109,566 $109,566 $109,566 $109,566 $109,566 $4,070,000 $4.070,000 $497,415 $497,415 $1,043,708 $2,528,877 $4,070,000 illifigit6APFUKLITtkPg06RCEShif,11 ,:WWw-,1411Verfii424liv4::-:-,W,,ivi:0441 4#14 §1 4niPl1 I General Revenue - Cash Certificates of Obligation Future GO Bonds W/S Revenue Bonds System Revenues - Cash Impact Fees unfunded $0 $0 $0 $0 $0 Other Funding Sources' - $2,480,000 $2,480,000 $2,480,000 $2,480,000 TOTAL SOURCES ' Explain & Identify Type of other Sources:65,566$6,659,566 $606,981 $606,981 $3,523,708 $2,528,877 $0 $0 $0 1 $6,659,566 800# 4 willing to fund portion of Phase I now in lieu of funding all of Phase II. City would contribute to Phase II. cash for Phase 11 from 1301014 $3,050,000. 16 Project Manager: Andrea Brinkley Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS 'dP '±rStW ,i•Fi`i"; PROS ECT ,NAME m .,. .': 1 .± , r. : ...I,. {. 1. D.L. Smith Detention pond Expansion Phase I 2012 — 2016 CAPITAL IMPROVEMENT PROGRAM 31 Pi,.i10414i'Aiii''d`•P i 4 i d. i.liid@P P,ROitCR!# DR2002 '!mN :gtlll PJtO,]ER_ t:IDESQRIPTSONjIi!4$.tFl.1,'AIi::.iMI;�M...f,,,3n^!I;rf;,,�:oL:tr•!;I ie y:,.r+!,{dfC�+"r4!!i:{','+thtli�fi�=nu•1,i424.f:,:N!.na:V„ lsl;r :4 dua:,F,.. ,i�IhesC�irL�3) Phase I of the project will expand the existing DL Smith detention facility;Expenditures by approximately 150 acre-feet. The expansion will occur to the west of the existing McHard Road outfall ditch and south of the pipeline easement. Personnel Services A future phase will add an additional 150 acre-feet of detention for further Supplies flood plain improvements and regional detention. services & charges Capital Outlay PRO]EC1114MA7yFICATIONII'. 1111,1 g!tl'ai+t;{1144`i±I4!'sdle'f,!»iiifi�l4ira JPa'I;£',;;iltiiii; tlNf11 �s i;j;I! Lr q yl In accordance with the city's Master Drainage Plan, there is a need for Total additional storage capacity along the Clear Creek Watershed to mitigate --- existing flooding and provide capacity for future development. This FTE Staff Total expansion will lower the 100 -year water surface elevation of clear Creek, alleviate existing flood plain issue, accommodate future development along McHard Road between old Alvin and Pearland Parkway, and be able to provide detention for the expansion of the University of Houston Clear Lake - Pearland Campus and other potential city facilities on D.L. Smith site. y, aiiafi�atrrik ;t„Pl:t y!;j P itt l + t ( ru !' ftl li RODEC,tIi [OSIS ALLODA ION, t>t,'y .. Preliminary Engineering Report Land/Right of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS Ittiii?iii;!I011itr'ii4'f iill i ONDING' *RA$CWWANOME 838188830k:ii1uN11b91a14 NI S�:t!i.1rv!�ril�lilI:i,ltJn' P� General Revenue - cash Certificates of obligation Future GO Bonds w/5 Revenue Bonds System Revenues - cash Impact Fees Unfunded other Funding Sources' ±TDTAUlAUDGET. 588,036 GN CITY hAP.PROP... . $88,036 $861,540 $861,540 $12,121,390 $4,124,390 $217,070 5217,070 513,288,036 55,291,036 mil:'payy!{:75l551.i11a 61:NFd';,i.Ni;P:;p'J]evi,mF41 u'„ "'i'Puif{hNN;e l{i�FS�iI&ylt±±l IiaE .1tq inn t . ;.d it ,I li R0 tt YOTAC..BUDGETtIr �.rCITV„IAPP.RORIlI 588,036 588,036 15,203,000 $5,203,000 PREFERENCEfvORDERS:p:,{'A,Ilyhp}l'l,Cy6!t(aR!'__Ti __Yui _„Af!P'i 2 S1 i0P. ER4TPNG_ AAD±i MAINTENASEEkiCO$TS,; ira q;4{ 2012 2013 2014 2015 50 i Kn,PR,1 CTO,ARORiIA'j!%(liN5=. 3i Rop evmATD row ,ilubceflt G hiiiiiH Abli 2012 261,0 'V 2 1 $88,036 $88,036 Er EVbeffoe UNDED�,-ys; 588,036 $88,036 $88,036 ."v[; „Mw i GR4[ ItT, h. �9�Ar In -x 50 50 YIN 2016 Al 41 iP.R61 CtAtiALNA $88,036 50 5122,924 $738,616 $861,540 51,368,881 51,368,881 50 572,043 $72,043 $0 $0 $0 $122,924 $2,179,540 $2,390,500 50 i;�i:±t-i1,i'rr-Fh:":it±t3i:u EST,I[+NrI'EDi''THRf'1 A'2b11dua'...,i $88,036 $7,997,000 TOTAL SOURCES $13,288,036 $5,291,036 588,036 1 588,036 1 $0 1 Explain & Identify Type of other Sources: In k-nd services totaling $7,997,000 from Roo #4 for future Assumes 600 #4 will maintain. Project t0 carryover to 2017. 5966,846 in 2016 to be funded by bonds in 2017. 17 $0 phases. rq [ 2614: 12015 $1,335,618 $0 $0 $1,335,618 Project Manager: Project's Approval Date: ..i :TOTOT',;I CA:L'4'. 50 $88,036 $1,335.618 $0 $0 $0 $0 $0 $0 $1,423,654 Skipper Jones 3/11/2011 CITY OF PEARLAND, TEXAS 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM FROJECTOW4Elm0114WWC-lpWillera&WfHWIlillq0411AgMallkliPalgeWl041P*WPACOPttqlVill&SMATAMMthialltNEWOREARgiiCtillelitOtliW&WW000&441gAIS Cullen/Em 518 Regional Detention Pond DR1103 3 FlRMECTOESCKIMONAIRMAllarllilleglannftlitillUMMOMMilitlhIgiiRtillgi.4lellq0WiRMgglIONliAlt&llfik00ERATOOANDOIAINTENANCEllllt05T510gliillirWagkgagil64C1Will4g Future storm water regional detention pond located at tEe southwest quadrant'Expenditures 2012 2013 2014 2015 2016 of FM 518/Cullen Parkway intersection. The project will include construction of detention pond, existing ditch improvements and possible underground storwersonnel Services sewer improvements required to convey development runoff. Supplies Services & Charges Capital Outlay pko3EttbiAt/OitATIoNliaMPM1ggbthOMMAIMMftgetiMMOMWSM$Rigialni The proposed detention pond is to provide the required detention for ....... 113't a/ development of approximately 155 acres of undeveloped land. The detention pond will allow for future development along FM 518 at this location to fully FTE Staff Total develop without the need for individual detention ponds which has been a priority established by City Council from Regional Detention Study. $0 $0 $0 $0 SG' 1110410,14-0:00mmolopmprAinianigoRogimmiuNzimiglomonoww,wwamxwoRkoTEGTED6wRRQRRA/TploPswoomittlawohmt.,:faimaiiitamigithmin --i,:.iYRwEd140m00,1007114014PITIPAPIWNOPPAPNOWAPPSOM46466toullgkikkiaigrailfripieMlmIrvTi1TrojeatimmirsviffivireurgiciEumg .4:1.;1111g4 Mr IMMAINSEINdinitt I I E 8,14816augdzallit 111a1Q1PARkeikai Mg1g0141114AlibIiiiiiit 111f2tria2F31::01Sijigill1 iigleibi'calt,:, IiReils2 .fiIifyie.1 tilithyercam Preliminary Engineering Report 5250,000 $250,000 $250,000 $250,000 $250,000 $264,000 Land/Right of way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS IWINNWPW00001t4r 'APIeNgftYN:94PLIPugu P Tkii I!. r1 General Revenue - Cash certificates of Obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees Unfunded other Funding Sources' - 'TOTAL SOURCES $264,000 $264,000 $350,000 $350,000 $3,110,000 $3,110,000 $598,000 $598,000 54,572,000 $4,572,000 $250,000 $250,000 $264 000 $350 000 __$350,000 $1,110 000 $2,000,000 $3,110,000 $0 $598,000 $598,000 $0 51,724,000 $2,598,000 $0 $0 $4,572,000 5F1 144OA01341440S9IUMWTION4MnA394fllitA44Mollit69iWiFiliglibih591144I4100449NSFe410111511511254140145i614iFf4ft$O59999Efl±AA005oftoi550 01ffe,p40 ILIFOO tilinipW04.tepkiVtlIFIWINDEpiNgSTImATEUt:NggrliggipenwliehiAwomAw410641.0“ms9ENt4gNgfwmiipmunc liGETTI% 11fr26312,11k ivaii521113et :2616.11rt yrThTArMi $0 $657,000 $657,000 $657,000 $657,000 $3,915,000 $3,915,000 $250,000 $250,000 1 $1,724,000 $1,941,000 $3,915,000 SO $0 $0 $0 $0 $0 I $4,572,000 54,572,000 $250,000 $250,000 $0 $1,724,000 $2,598,000 $0 $0 $4,572,000 Explain & identify Type of other Sources: Partial offset by regional detention fees. Savings from E. Mary's & Town Ditch voted authorization for Drainage Projects. Assumes BDE9F 4 will maintain. 18 Project manager: Trent Perez Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS ROJECT+NAME .I .. �.y t b h a. t,lr old Townsite Drainage 2012 — 2016 CAPITAL IMPROVEMENT PROGRAM li"r,cae PROJEG444404440474:lkAtvv;li 4444ud4t```:itlik4011:40l:P.,0.EF„6RENC2(ORQERie1`�S4_6:4(i40f:a,.4lr4'1'+?�'t>`_` DR1301 4 PECT.DEERPTTN r ... n�NtIn_4v,W04��1na FL 1dt iwvY,.:,.ruy,; _.- - - u4.a`jrd.,:a The City's Sub -Regional Detention Master Flan lrfentlTied an area located Expenditures within the city's old Townsite as a potential location for a sub-regiona' detention pond. The 41 -acre service area is located at the northwestiPersonnel Services corner of walnut and Galveston and extends to 5U35 and FM518, which is Supp lies within the southeast quadrant of the old Townsite. The scope of th_ project will be to develop a drainage and detention plan for serving the Services & Charges area with a sub -regional detention pond and will include the devel„P.c, of a PER that determines pond location, pond size, and conveyance to the sub -regional facility. Capital Outlay PR09 ECT"J,USTIFICATiON id...Ufln-liy:i I4. 1;1 .. ,e! , p+l� �; +r.l:'l: jy�;!i?ir m;[I , +.Y �.? 'I!P'�f ur ;?'�'r r" 'r: .:mi - n priority ori'r:._ - fb ,.:Ep8r_I dfr R �_ sr - `. .: The need tor sub -regional Region In etas been a pn as ty sea by ne n f t which led tr Total the development of the Sub -Regional Detention Pond Master Plan. one of the short-te rr priority projects was a pond located within the southeast quadrant of the olc FTE Staff Total Townsite. Phase one focuses on the area located between walnut St. and FNS18. R. development of this portion of the old Townsite has been difficult primarily because of the inability to construct on-site detention. Implementation of this project will help alleviate that issue allowing for approximately 15 acres to develop and will alsc provide regional detention for the re -development or expansion of approximately 2C acres. In addition to this, the detention pond will also serve and mitigate the impacts of the expansion of the roadway network within this portion of the old Townsite. 7ftliiii Ii-,,( an;,JN, „RET"ESTSA1�CAI40. ta la.., 1' -'f I , Preliminary Engineering Report Land/Right of way Design/Surveying Constructi on Equipment and Furniture Contingency TOTAL COSTS FUNDING ISOwilis. General Revenue - cash certificates of obligation Future GO Bonds w/5 Revenue Bonds P.E.D.C. system Revenues - cash Impact Fees unfunded other Funding sources1 - TOTAL SOURCES 1 Explain & Identify Type of other 118 TAYAL,IBUbGET !% $176,000 $176,000 1 $483,000 $2,756,000 1 14H y I f lr ld4#r iii rCITW,APPROMI $176,000 $483,000 $2,756,000 $3,415,000 $3,415,000 TOTALI:nBUDGETri, '.ddIT.1'IFAPPROP,E $3,415,000 $3,415,000 $3,415,000 1 Sources: FUNDED,j4 OMEir $0 9tla TWO 91-80114201t .!Op,EOATING AND„MA`INTENANCEit1Co5T5: h„!iinin4"%ili r?afi„4Y,L;':,;';{?+, 2012 2013 2014 2015 2016 sol $0 C::` S EYrYQRO7;ECTEDvAPPRDgRTATION 5J6;3i417nLbL�4 it 1 ;' lit ld , ° tmP {i' ik4Y'i'VP jl4i4a 2012, cj;�Dl.3n,�+ie $176,000 1 $483,000 I 50 50 1 $659,000 50 $1,929,200 $826,800 $1,929,200 $826,800 $0 $0 2016'ii tRROJ'ECTuTOAILh $0 5176,000 $483,000 $2,756,000 $0 $0 $0 I $3,415,000 $3,415,000 $0 19 SO $0 $659,000 $1,929,200 $826,800 $659,000 $1,929,200 $826,800 Project Manager: iivio DECUTOTAC!:I $0 1 $3,415,000 1 $0 I $0 1 $0 1 $0 $0 $0 1 $o 1 $0 1 $3,415,000 1 Engineering - N. Lira Project's Approval Date: 3/11/20111 CITY OF PEARLAND, TEXAS PRO5ECt*AME5MTPkjijij'fr re Westchester Circle Drainage and sidewalks PRO7ECT:WOESCRIPTION6 fl!!r11;±'t,r lri!?Ili !?I nb`i_iI'! g4,rl.?"!fiiuj��,Fjj iFlfi;�i (i15d4 A sidewa1E will 6e constructed along the west/south side of the road, total length of approx. 2000 ft. Enclosing the existing ditches to mak room for the sidewalk will also address some existing drainage concerns. 2012 — 2016 CAPITAL IMPROVEMENT PROGRAM r _ ., —.: iY' 'i:' un'"uric'} rirgfdincn!i1HY!�BRir .,_.. ,,,...,, PRO]EC'Z_#y:�.,.;y,,.,4.tagt,N.,.�.J,avft P„RE,FERENCE„ORDERr;:;;;?$ DR1201 5 iilitttii0� 14 "R+ � i' - 5 lwyl:X:j;d"gNf.k'a:i;p;4r_!1: y.a'. i•,!a .. "'i;i.,.:f..:,ii='11:1?�,,3?>„L,�..g(i,(�OPiERA�iNG:�AIJb 61I1IN7ENANCE,:,COSTS+.S..»,.;,h,...i$;,,_P:,.u.....,::::�.a°::x,��?s:,.,lii. Expenditures 2012 2013 2014 2015 2016 Personnel Services Supplies services & charges Capital Outlay 'kFn!i,lOhN 4 4 iftiy'!jjl}j:71 aie'�' iliilrv;=t illi �!�ttiia.4iiiil Westchester circle extends from FM518 to FM1128, and is often used as 'Total traffic "cut -through” by people attempting to avoid the FM518/FM112f intersection. A traffic study was performed with the recommendation for FTE Staff Total sidewalks to be built as a measure of safety for residents walking along the road or retrieving their mail. Currently the roadside ditch drainage systen- requires that pedestrians walk along the edge of pavement creating a safety hazard. PRO7 EC'I:!'J itTIFICATioWi!; . A:i tlN;lh yPliOiP!.h'R0 ,nig!!!IS""I7Ni„Aiil 4inm: PR07ECT COSTSFM :E{0CA , Ow Prel minary Engineering Report Land/Right of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS til ND NG1Ii'.,4,I�i�M1111,�iS FUNDINO*30RCESq„ VEi1sOunNukWli F!r!'rI: 'tl fPel, fwk „g F l i¢ i#4,vi, �FNak;wgw' TOTAL+Ir3UDGET: 1CITY 1APPROPN 539,618 $39,618 5296,175 5296,175 529,618 529,618 $365,411 1 5365,411 d,;npo: .:'i th .,ry4.Lpia,r sir"m,ifil>P{AA4 �l +i!, if(u Rop„u TUTAETBODGEE „CIT MAPPROPrq General Revenue - Cash Certif'cates of obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. system Revenues - cash impact Fees Unfunded Other Funding Sources' - 5365,411 TOTAL SOURCES $365,431 I Explain & Identify Type of Other Sources: CDBG Funds 50 $0 50 :FYiiyRO3Ee[ef)tf;$P,;RRPERWMINS'u*64,',>gramia1661Si.'Nai ri :!1iii6 3;7HRUf 2011";N1'ii2'�012�f•* �4 N 12meirgah}013t'ifl p4m00+��'.�llg20i $39,618 5296,175 529,618 $0 50 $365,411 n10iq;liwn1°if;;C• 3H,i:~i'W=1ti4pe _ESTIMAtED`'4 i.`GHti !20111f SO 2p'7 013 t 42014r 50 50 $0 f. 50 IMMO ! PROIEtT1ItOTAL: $0 $0 $39,618 $296,175 $0 $29,618 50 $365,411 5365,411 i 5365,411 5365,411 SO 1 SO $365,411 S0 SO 1 SO 20 %Sete .lry ia3y"r' "r'.6a'j'7(N [PRO]�CT'iromL": $0 $0 SO SO $0 $0 $0 $0 5365,411 $0 5365,411 Project Manager: Public Works Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS P AO $ ECFi((NAAEnl; ;"„$ Piper Drainage & Sidewalks PN !`'rljl iini0C%Pjl![:;,nr;iH 010 IiISv if; PR07ECfj!DESC4IpTIQNHnl R ,! !ri5lia. Enclose ditches along Piper between the pipeline easement south oflExpenditures FM518 and Fite Road (approx. 2560 ft.) This system will connect to the existing storm sewer on Fite Road and includes dredging of the linear Personnel Services detention pond just east of the elementary school at Fite and FM1128. Supplies The storm water pump system at the school will be eliminated as result. This project also includes sidewalks. Services & Charges Capital Outlay 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PAO]Kfgi#yPij ; R,REFEAENCEk,OADER?N'1'm'At' i'diitOW DR1401 6 t`,.il:dtel O n'ALO ',:."1{G!,'!,u;t!ti6 ::p P .,-c.l....- L..-,l'ttF.:1,4 �!k a.,.-OFERA7ING,r.AND,=IMAINTENANCEt COSTS d;M 2012 2013 2014 pROSEc!3u$TICATIONLI_4A"'a i I._f.1,I7r. •r%i J {!i%i�nCl?ii Vii?;!, 3i i� �ixa! The project was anticipated in the 2001 bond; howeve eliminated from the Fite Road project before construction. will relieve flooding and high water issues along Piper. vCltl'iiy%P' q, Aft het vie tt ogise.1IO,CAX ION „. P,R07E •� COS,TS:�AL OCAi30N V 4 g ii,;.,!�jp7!,,;MONhii!i?IGi Pre .urinary Engineering Report Land/Right of Way Des.gn/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS il4Wl'ifG?i:Ui�'i ! }i%IIIV'`; tp; FUNDZNG:ISOURCESI?.,t '!%i_tin! nxi 1,11 r ��Ix z i !'L!+,ai, General Revenue - Cash Certificates of Obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees Unfunded other Funding Sources' - ITOTAL SOURCES $589,988 I1 Explain & Identify Type of Other Sources: it was otal This wor'T FTE Staff Total S0 SO 2015 $0 50 2016 a, i ;k :; l gaeiAHMOOr� �i " fU ' t i W t+Si'1T+ M +- ,.FY PROO CTED APPROPRIATIONS•: iYla '• i x " ✓ ;'''.Mkj: ",€ t n 15 H�.q.�.,k, hiF f4 to ..flt.,fl.ea!PN!�.i.. klhN AlIINN.4tNfl9Y.fianhiy7., ..,..i-.,d:6::eP..,.. dtl ,. .,€ .. .A'. �.,.. ...__t... .tL*,141;9_..in"u15i4%;%'Ii?'1'i3il�fliffiGMf;Nr!k.'dM�a,_x'd,!mk.,....,.t^ iP'. N,f 3E 71 F. I li%'''i' i. f ,A 1.,. 1 t ., 'iM� ,� }) I .; .. ,�I•:P A .FUNDED EBTIMATED�!NA t � I L'1! !. k; 4 it, i�tti .,t��l�a�,a.,,. ,, k�19 yy�� ..":TOTAL'k;"BUDGETr, �:@IRY,TAP.PROP:y+in BUDGETa9d 'nlA'RNRU�20`1ilI1fN! $67,048 $67,048 $475,400 $475,400 012'i �2013qAU1't. $67,048 $475,400 $47,540 $47,540 1 1 $47,540 $589,988 $589,988 $0 1 $0 $0 1 $0 $589,988 iNriAo,:PaLMcAlaN+p9ilam fltlPMtlr!aoi alliwoItBa;aY}:;Kk'6ieiunlIxxitir+h:&iA!! parN4hi ,Pit ir%irirl!t,J:n'!I i li It I'H; Bill=! II! ifp hikli(( b! i ji ;FUNDE0'�",) t'1k�E5TSNIATEDi3ki h,! iUh G T ICfl5I RRROP� � L, .8000ET:1'� ',41iR0 70TkL)"BUDGETI' i62, t i n { $589,988 $589,988 l` rQQ_c P'yam 2015.ti016 T! $0 $0 $67,048 $475,400 $0 $47,540 $0 $589,988 50 1 $0 $589,988 $0 $0 $0 $0 21 $589,988 Project Manager: Project's Approval 50 50 P.R07 ECT„T,O AD $0 $589,988 $0 $0 $0 $0 $0 $0 $0 $589,988 Public works Date: 3/11/2011 CITY OF PEARLAND, TEXAS P,ROJEOT4NAME{!116 +F;;�tii PER for Future Bond Referendum 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM ROJ EGT. PRFERENCE:"r ORUERv+ijW, PRo ECT''DEQRSE Yologli '1.:9C frA4 011! 51,"!:,i.; all ii'!,gisri..,rr I, .T. ., ,LQu.1{5,„,:,, liifn!�Ua.r.a!�.r�ip,r,,;:�., r.,,i .a 4u uUm7io�ui..r !.r DR1402 17 044OPERATI'MGiAND.'pMAINT,ENANGE, COSTSi:;”t:li„;mallea,f+.{;$`;,giggSLili3=i':d Provide Funding for Preliminary engineering on future protects yet to be Expenditures 2012 2013 2014 2015 2016 identified that would be funded with the City's next bond referendum. Preliminary engineering would tighten down scopes and provide for estimated Personnel Services construction dollars that would be needed to take a proposition to the Supplies voters. Services & Charges Capital Outlay PROD'EGT;:pOSCIFI'¢AtioOKrjgpY6`9i;9N'+41+iir. Ya f{let{i!I�n'iE!i MOWN' PRO7C.OSTS Whq;o11 iiJ Preliminary Engineering Report Land/Right of way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS General Revenue - Cash Certificates of obligation Future GO Bonds W/S Revenue Bonds System Revenues - Cash Impact Fees unfunded other Funding sources - TOTAL SOURCES 1 Explain & Identify Type of other Sources: Total FTE Staff Total $0 $0 ":iiSitlii;',$j Wilq 6"!'19H4'fi f}U:414+Mtii!:Mi'!itiijPi>•;TJ(tia:;rr'iy" 1,%;;in!?,>;',iit"C!H!fhi!Piulif!FryWP,RQJECTEdiYAP.P,ROPRIA?SOty5{Rk+tri g;"!`! 4ipHi{i itfipia"tr!!}}•.d" ri;i';4. .". lu�:,.,,......�.....!, , I..:... "-gpm .r:: ,-! fir ;r }I i °1'i„ �` H''"i'' '' {Yr.iloh . ri�nt„,,�uf . FdtN ,irk',C',�i� l irni' o. � wF!ONDf„D,RS. r A o.0 -ear , TEjs't 1 �H ! t ,l;�f f!{�y+, r: r,w r TOTAL'+ E'DGELH , FIT.Y,@APP.ROP“{i!l. ;i�I:BUD'GETTT : THRUTzul1 : O.4u12'm iti201r3r^tr'i T' +j20i� $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 i!liiF!i!FIiiW.'llh`t+�kffl+iM.'ril!i'!:i ToTA'L BUDGET,'I' CITYIIjARPROP. $1,000,000 $1,000,000 $1,000,000 $1,000,000 $0 $0 $0 $0 $1,000,000 F'UAD414g SAW 44 ' BUDGET...r THRU 12011 , 120`125 ';s $1,000,000 $0 $0 $0 $0 $1,000,000 22 $0 50 50 ,!�uftt�k,'iAN.L'�.+t;♦I PRRo ` TOT4 ta $1,000,000 $0 $0 $0 $0 $0 S0 $0 $1,000,000 hafg I2n15 50 N_ r ?:201Gr, yi 'iP.ROJ',ECTt".70liP:AMMLF $0 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000 Project Manager: Projects Project's Approval pate: 3/11/2011 P20006 / P50072 !','.hRro'je�ctN"amre Trail Connectivity P20005 Max Road Sports Complex Phase I P20002 Shadow Creek Ranch Park Ph 1 P50071 Centennial Park Ph II P20001 Independence Park Ph 1 P20004 Delores Fenwick Nature Center -Ph I PK1501 Hunter Park 1PK1401 PER for Future Bond Referendum PK1502 Sports Complex at Max Road Ph 2 PK1601 Shadow Creek Ranch Park Ph 2 TOTAL CITY OF PEARLAND 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PARKS ;fhi%i !tYtirite ;,;!Itr?al 7 1'i8 �:i6!: {Iiia, SQCj,RCEjiOFif FUND 1t3 !rfl'ti"i�? 2 14 725,000 725,000 $2,267,650 1,296,247 $611,212 5,178,052 2,588,736 354,000 1,373,658 500,000 725,000 542,342 179,810 158,000 602,500 486,000 $ 2,878,862 $ 7,553,299 $ 5,187,394 $ 2,693,652 it 201,p% Torattl, 2,175,000 3,563,897 8,378,000 2,270,000 1,906,803 2,086,613 736,026 894,026 602,500 500,000 3,724,000 4,210,000 1,078,000 1,078,000 $ 7,444,829 $ 25,758,036 General Revenue - Cash Certificates of Obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees - Cash Unfunded Other Funding Sources Plus Bonds To Be Sold 117 Future Year TOTAL 2,335,161 100 000 525 000 5,721 970 1,025,000 5,324,424 18,000 370,000 200,000 $ 2,353,161 $ 6,716,970 $ 6,549,424 U'+: 04! 525,000 487,622 713,302 486,000 362,878 $ 2,574,802 1,777,724 4,802,000 $ 6,579,724 Note: The totals do not tie by year as the City anticipates appropriating funds for GO Bond projects in one year and then selling the bonds in the next year. 23 TQTP 625,000 2,037,622 15,872,581 5,288,000 950,878 983,955 $ 25,758,036 al otiggi MI inta am S-1!! Shadow Creek Ranch Park Ph. 2012-2014 Shadow Creek Ranch Park Ph. 2 2016 Max Rd Soccer Complex Ph. 1 2012-2013 Sports Complex at Max Road Ph. 2 2015-2016 Hunter Park 2015 Shadow Creek Ranch Park Ph. 1 2012-2013 2,N,4913111 N sa,A411 n111 11111 VJiIIIIIMIIUnL 11111[� Trail • ._a • or i :•• Sports Complex at Max Road Ph. 2 2015-2016 Independence Park Ph. 1 2015-2016 Centennial Park Phase II 2013-2015 Delores Fenwick Nature Center Ph. 2015-2016 Delores Fenwick Nature Center Ph. 12015-2016 This product is for informational purposes and may not have been prepared for or be suitable for legal, engineering, or surverying purposes. It does not represent an on4he-ground survey and represents only the approximate relative location of property boundries. THIS PAGE INTENTIONALLY LEFT BLANK 24 CITY OF PEARLAND, TEXAS PRO]OMIk11AM;;ilifi:;,; Trail Connectivity PROJECT:i bESCRIPTIONI8 f ij 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PRO€CT{ 'f P20006 % P50072 P.REFEaMek;iORDER";,}t'`j;,�: 1fit ¢j i:4„'i, titine; a pi'e:(.c,!' _[:'ii;mihry;;?<'ry':;.ii'1'.lj "'� ; w' 1P�ERAiINcrAN �,. INT'ENANEE�`COSTSi~r"µ}:.5.9�:Jt,::'=:;,::,+TP=.hyFI!:=t.:fr.C;:.: n ,;.s k. . a si i #.:. �,hr s5l_. �eNA. M .. .... h Implement phases of the Hike and srke master Plan starting at Centennial Park uwites ?Expenditures 2012 2013 2014 2015 2016 temporary connection from centennial Park splash to Magnolia Rd. Trail continues the Iohn Hargrove Environmental complex, then to W. Mary's creek detention. Phase it Personnel Services $30,100 $63,700 $68,477 trail will connect Centennial Park to 1128, Phase II will connect centennial Park t. Independence Park and Phase III - Independence Park to FM 518. supplies $5,250 $5,512 $5,787 PROj E ` 0. trIFICiATION'i`; IUM; dlniiCat Services & Charges Capital Outlay The Parks and Recreation Plan that was adopted by Council in December of 2005 lists the Total hike and bike trails as the number one priority for acquisition and development. FTE Staff Total imris ir`it41'itf!i' f i$9 R07ECO$TALLOA T!t!lSn##ON:PP . 3a1,NwLOj Preliminary Engineering Report Land/Right of way Design/Surveying construction (Equipment and Furniture Contingency ITOTAL COSTS pw;r..:.: �L FUNDING50URC S;12T�iih:lFnsMOI General Revenue - cash certificates of obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues - cash Impact Fees unfunded $0 50 $35,350 $69,212 1 2 !;ibat!iniidN!'N":skikkiki-0iklfiHG!!il!44.lf„'«+.»''itN'!Y:'-i!i'?I I!'-'iiuft;!1F; ivl;I d%iii"isilGd ". AMPRO.ZEq'TEDi}PAPP,ROPXWIONS.:eitil:daig4g;t4;24ii t 'tt: f { f ",mf qx - stir r rn! i,R wl?R, u FISNDEO�, . h ESTI ��"�T 'D - .i. �tr iii i, t,�h ?. t i ;fll, unit.; :j t'p: ,'g{ t�tla �:, f ii OTA BUO;GETA CPTi1:1iR"PP.RO ie;' �1:i fiBUDGENRA7 POTHR0:h201r1?th fikk:201 �a.�;�i, 20151 $26,825 $26,825 $26,825 $26,825 $100,000 $100,000 $575,000 $575,000 $2,410,730 $2,410,730 $100,000 $200,000 $610,730 $3,112,555 $3,112,555 $937,555 f.,:a NFkewifiLtl;n:isr!h!!,NPHtlkliiiWGP.I6k!4iu;d!,Abi!55!i.infr;i`nrr.!i f!1 't '..�!{ IPt !' '( i4 r:6:f !I iii - }..m.:,. :,.vL1.�4!!�I! ,„ti,l�±(l�b..h iVg iYi*�yilii.! TOTiA"h{Ii60OGETit„_CS7Y�f APPROP„ d $1,150,000 $1,150,000 $1,076,825 $1,076,825 $183,000 $183,000 FOND'EO",j� i�BW DGEILi'I,:se $625,000 $26,825 $183,000 other Funding sources' - $702,730 $702,730 $102,730 ITOTAL SOURCES $3,112,555 $3,112,555 $937,555 1 Explain & Identify Type of other Sources: Texas Parks and wildlife Trails Grant Funding -$200,000 a year, $100,000 in Expenditures will be limited to funding available. $100,000 $200,000 $610,730 $125,000 $125,000 $125,000 $600,000 $600,000 $600,000 $937,555 $0 $725,000 $725,000 d eknigM:Pi'nl:9i!IYh':B14R>?I i:C keith E kik roi:ia'ti!!ni'iKr_' I TEpi;. :, ni, !"at; ,.A, 013 fTHRU �IZOY`7.`�,., .r.'2012�,'itij. �tff dL01 $625,000 $26,825 $183,000 $102,730 $937,555 2008. 25 $725,000 $525,000 $525,000 Oa 421:0251.- $525,000 $74,264 ROS ECT na:nA 8 TOYA; i $26,825 $100,000 $575,000 $2,410,730 $0 $0 $0 $3,112,555 $200,000 $200,000 $200,000 $0 $725,000 $725,000 $725,000 Project Manager: �ROJxE, I,Ol i $1,150,000 $1,076,825 $183,000 $0 $0 $0 $0 $0 $702,730 $0 $3,112,555 2 Cara Davis Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PktoEct414MEWOWNCNWZOiliTtflWWWW WIMAWAiAtW, Max Road Sports complex Phase I pRcuzeT9014*ggwlilikaffli*WIJAMNIVIEicatikdoxtillANWAIINWOOMMT 1 P20005 2 PRWECMOIP.ECRMTPAINOMOINIMWOOMWWWWWW010040WWifiNAgatiWNWONAMbaSKIMMOOFRATINtIANthbAINTENANGEbtOST5agaflfTOWAggiliaaia Proposed improvements include six international sized (11 vs.11) fields, parking,j di2012016 restrooms and a covered area for gatherings. Approximately 1-3 fields will be lightExpentures 2012 2013 2014 5 and the park will he located inside of a detention facility. Personnel Services 547,000 $48,880 $50,835 552,869 supplies $7,000 $12,000 $12,960 513,997 Services & Charges $137,000 $182,000 $196,560 $212,285 $5,027 $6,702 $7,238 $7,817 'Capital Outlay ECTJ There is a significant need Tor game soccer -Fields and sportsWelds in the city. With the development of this facility centennial Park will be able to be converted to facility for youth softball that will allow the youth soccer program, youth softball program and the youth baseball program to expand as the population in the communitb ncreases Total FTE Staff Total $0 $196,027 Annual Revenue Offset is approximately $15,000 1 $249,582 1 5267,593 $286,967 1 1 flit.egiei*gel;sie14014eveitlaTOZ4VMANEYAFROUCTEWAEERDERIAIIONWMMAVisiNgSeSSAONJWANAM4fiftga ingliitafteliNsNitiRifigneingfialli „the, j crb g let !it lii6D,Vmlf L'iil tt"., (!d thriu lgi±,,,Alm „ ,„ itHRTMOCIAMUMPAROMMOOPPNINNIWRIO0VOIVINWItlfrIVEINSigtiVASSWAIMAINNTS Gi; I JAPPROP7, A Om:. OEFO4kdi ,cT kb : bit ig. Preliminary Engineering Report $12,881 $12,881 512,881 $12,881 $12,881 Land/Right of way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS milmmowwww g Agivogd*160001 iitaiXtbs4 ,thbbxx-papbbryir bx b.lablX*044,0A0fObbh!b!Th General Revenue - Cash Certificates of Obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. system Revenues - Cash Impact Fees unfunded Other Funding Sources1 - TOTAL SOURCES $343,103 $343,103 $343,103 $3,239,500 $3,239,500 $324,397 $324,397 $3,919,881 $3,919,881 $355,984 $343,103 $2,267,650 $971,850 $324,397 $355,984 $2,267,650 $1,296,247 $0 1 $0 $0 $0 $343,103 $3,239,500 $0 $324,397 $3,919,881 0406Wild0104:066W4PONIMSONEOWMW6011:6617flSA4M610i010iSi67A611:06111M:OSOO:e0O040tid606:04010g4gfl74,6M411:41SSI4611:74:24dst0imamtiti gififtflOgKi ggioaokigi:pgneimms agis to loci gag% %pitie ssiqcfdlsiprokibugan A imi!i,gFuE-rilliv Ai;6trapadipm gifatecermoTicillogit xiszditi Goipag shatibe wrio 640 q,!(:1,1waxectiii $0 $12,881 $12,881 512,881 512,881 512,881 $3,776,706 $3,776,706 $212,809 $212,809 $2,267,650 $1,296,247 $3,776,706 $0 $0 $0 SO $0 $130,294 $130,294 $130,294 $130,294 5130,294 $3,919,881 53,919,881 $355,984 $355,984 52,267,650 $1,296,247 SO $0 $0 $3,919,881 1 Explain & Identify Type of other Sources: Zone 6 Parkland fees. 26 Project Manager: Andrea Brinkley Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS P.ROJEGt;NAME.!' iifliil;4iiiZtt! i!; 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PROD EOt. Shadow Creek Ranch Park Ph 1 P20002 PIPIy•a,:A p.,ux ProjectJementsinE7udeeeight-Iiay.b9Tted'.'Pi.rsL,ou',ilFf$ala l%baRlIaTT- fellsI. ,on :rLel,rIlJ. soccer occeri,r.eSdmq; ;:s.-ni::tzc Expenditures volleyball courts, parking, a hike and bike trail around the fields and a lawn amphitheater for special events. Personnel Services Supplies Services & Charges Capital Outlay PRO'JEtV7UST,I I'CATON` :AIj��:,iiIAY: !ji;,�14 .3i:. _li4i�.p: tipu_�- afe hefcs mud tyC to3slry Mthe2r tici ate gr a mof heraree sports complex Itl tFis dre Total of the community to serve the anticipated growth of the area. .,. ;, C .,at f,.-,,.a:,.�n a, ,err, r,ya,.: r.,, ;L�, I�:...,.j pAy 1p, 11 {I;PR09 E`CT t�605,T5ll;AL:LOCATYON. y ISSOKft41601,10 ;jO;;fila, hur Preliminary Engineerinq Report Land/Right of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS 4N'ii TI H �s'�I�''YP•71Y�f�[ FUND NG SOWRCES;Vi TWOr General Revenue - Cash Certificates of Obligation Future GO Bonds W/S Revenue Bonds PREFEREkaci,kOERis. r^ +40,PERATIN6!IANdF MATNTENAN6EY,C,OS75:iz,:.,:,.1-».,.:.. ua....,k.ycm. 2012 2013 2014 2015 2016 565,112 $130,225 $135,434 $16,150 $16,957 $18,314 $115,000 $123,625 $133,515 $42,925 $30,000 $30,000 $0 $0 FTE Staff Total Annual Revenue Offset is approximately $40,000 ,•••. 4u 1. ,' :!I': :J{ e .,li,'r '.ai.fl zarG"; L»ariliE;isanmllt:s,Mllll4niilki(,`�kt;aHSi,:(i„od?inNi:iw rChli,klual4�tw,ak:w•.r��ckt!+ew,nn:'"'i:.=k�..FY,rG?Ro3Et7�RtrP,P.P,2ogit7:4TION5 r:1inE;;.,d=,. =,1,!yw,aaii"jti '3I :!!.. ': ei;':1" .u,. .:,,. ':Fl",4,. ay .•0!. .p 4 4'ikl Az "fi . G ., rEl}N ,."'y "r : ,. _... � ,.,.. ,., .u.., ; ,.n .. ...,... rd:.. 1 ,. , If pl ..: , qED: t.ql �ff,ES �IMn,'rEoK' , i';i R"" i:� ,�' .::64 �: i::a;�'•il$I a .,,i•, ,.: f d,,,i �i•�i,�, Irl!u. ,,B.,,,,,.,_.,�. . 4THR-,._ ; s r .012 .. 1 ,., t { !..gill ,,;h , Y; 1 n , ,. b, :, r. ,. s�,l�t. !ra . '}TDTAI I:BUDG ET.•:i, �GIT1Y, AhPROP. rt dtBUDG ET:. THRUtr 20]A, 1 „ _. ,. �., .yrFhd , .w,:,cn2 bkaN+ 74�r2, $37,051 537,051 $37,051 $37,051 $610,400 $610,400 $7,003,900 1 $7,003,900 $763,700 $763,700 $610,400 $4,978,864 $2,025,036 $812 $199,188 $563,700 $8,415,051 1 $8,415,051 537,051 $37,051 $611,212 $5,178,052 $2,588,736 1M d;i,isN!L'ilfliledIiidl 9; t11i?;i!5'1!etititin!:,+NB 6;ih5i!N:I:,Nt7x',9I@Ogiillm thijla;+.8'yd.':+iui;In:fi:Iti6Pii9iiiia lF,'ii �:iESTI t TEU'r, yhj iTOTrOMU,; .00A1.41401#14CIfARPROkldDG,;,±5 1i- i }SOTABI;!B UDGET.! 'S:GIH"9 �1.APPRO P:¢},B„BUDGET offs pTHRU;,i201'L'' "- $37,051 $37,051 $37,051 $37,051 $8,360,000 $8,360,000 System Revenues - cash Impact Fees Unfunded other Funding Sources - $18,000 TOTAL SOURCES $8,415,051 I Explain & Identify Type of other Sources: Park zone 1 $18,000 $8,415,051 $37,051 ,51131:ii!il r4i'i iii 204 2013 :�P=.�.�" .4 83+2014 5239,187 $67,511 $4,341,723 $3,950,766 $18,000 $37,051 $85,511 $4,341,723 $3,950,766 27 4 $0 1 $300,807 4 $317,263 4 aY :; hT�,'tl Yt 20 $37,051 $0 $610,400 $7,003,900 $0 $763,700 $0 $8,415,051 0 42056, $0 50 Project Manager: Cara Davis iPRO! ECT 1 TOTAL, $0 $37,051 $8,360,000 $0 $0 $0 $0 $0 $18,000 $8,415,051 Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS PROJECT!:'NAMEv 313 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PROD ECIe # nvw4114 ",^!:+';:iii;!!V'i :;:'"i4 PREFEREuttlbRDER Centennial Park Ph II P50071 PRO7E �i';DESCRYPTION:`!i i?S'.' - ,i!:5't - {: ;$„+•�,"1tPi.,';'i"P'i•`:j';�iiy'r.Yi�u�dFl�,v Fl i'Ilin.r: r',xai ;.. Phase II of Centennial Park includes the demolition of the existing socce Expendi tures fields, the construction of two new lighted softball fields, the installation o a new picnic pavilion and additional parking for the complex. (Personnel Services Id'a tl +(Supplies (Services & Charges Capital Outlay pR07,ECT�'7USTSFICATSON!i!`,'::�i i�y?`t y5{!; +_+__. 7;2!r i 615---%F_"h ce-E-WTrIli! e;;iai_P_ once [Fie max Goad" sports comp T"exis com Te[ed- "youffi""anif-aduYt-soccer wil"f" move frorc centennial Park to Max Road where the program can be expanded. The existing soccer fielae Total will be demolished and converted to lighted softball fields. Girls softball will move,l-E Staff Total from the Dad's club to centennial Park, allowing their program to expand as the populati-. increases. Adult softball will ultimately move to the shadow creek Ranch complex once completed to make room for girls softball. 061,0114 ECTF COSTS1hAUL0,0,4 ON! }}, }tF„�if1{ i.l`diu4il t.!ai �>ti-iil}i ni Preliminary Engineering Report Land/Right of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS ';�1FUNDSNG'l;50,ORCES! ; „ General Revenue - Cash certificates of obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees Unfunded SY. i'"rii6;lilkff INidyl;".4'is=tinniTaTAiaiirOf,1„a'f!i0„ra . wa:r„l I ii+l` timat1effhL�I!11.14f n l irUNDEDi l {: rot r i'BUDGETld CITV,"?'ARPROPSSf tthi8@UDGET, $207,000 $207,000 $495 5495 $147,000 $147,000 $1,732,200 $1,732,200 $183,800 $183,800 $2,270,495 $2,270,495 ai .p 6.!q;n lit: i41i'fli}il lwihIf':{Ug :'i oTA; D , L t..i:rfn,.h i61. TOTALtGeUDGET�11. L�CITY,1i3QPPROP,i?i $100,495 $100,495 $2,000,000 $2,000,000 other Funding Sources - 5170,000 TOTAL SOURCES $2,270,495 Explain & Identify Type of other Sources: ZONE 7 FUNDING FY13 - $170,000 Analyzing use of Hot Taxes as an alternative funding source $170,000 $2,270,495 4 Sei' OPERATI 'G"'AND h1A2NT NANCB.'COST - h r ,-. E �.- -. 2012 2013 2014 $0 50 el:ll?:ittlli:?WFKt9PX08F44tEDa;AP.PR0FRIATSONSIEdr, `„;;i!&}ag'r4,i+.�,p: ESTSMATEO �rj 1' l �' Gk d a i !, i Hi Idyl ! im' ,9 J�r'ry THRll:ii'2011Au &,20121., $495 $495 5495 $495 4006Nix- EST MMAp7ar iBUDG ET. rf : edTHRUi}20allks: $495 $495 $495 1 $495 1 28 SO 11 20112 $207,000 5147,000 NY:i21F.Ee 2015 $26,250 $1,875 $22,500 $7,500 $0 $58,125 51,189,858 $542,342 5183,800 $354,000 $1,373,658 $542,342 1 2016 $35,000 $2,500 $30,000 $10,000 $77,500 ii;3'r�5!iuiakii i1 PRO]R:wWSYMOS.� $207,000 $495 $147,000 $1,732,200 $0 $183,800 $0 $2,270,495 $84,000 $1,373,658 $542,342 $170,000 1 50 $354,000 $1,373,658 1 $542,342 Project Manager: Andrea Brinkley Project's Approval Date: 3/11/2011 20 ROJECTIt$ii b AL.Y,Iii a 5100,495 $0 $2,000,000 $0 $0 $0 $0 50 5170,000 $0 $2,270,495 CITY OF PEARLAND, TEXAS ROTECTNAMEN0, .r"r DPAMIMIP Independence Park Ph 1 P60TECTti!OESGRIP,TION!rN;ft:OigMNI #tf;tkBjir!;H Phase I Improvements include a reorientation oT the entry into the park, relocatTon_ anc upgrade of the existing playground, improvements to the existing pavilion, the EXpenditu res 2012 construction of additional parking, an amphitheater for special events and landscaping. Personnel Services tg;i"NY7A nYriFaii!>!, 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM 8807EC1 #fM ":P`p Pe r P20001 P6FERtitia iRDEK d;£__C}T_` 5 :It;rh';yl$';iia1'jjAwjgi'n+ICtSiA!li$N4MOPRI$0I601AND yMALHTEMANCE,,G05T5 Supplies Services & Charges Capital outlay 01407;ECT47 USTI1;CA'[IW djyl;'�i;l!wIi;iNk'�tifi„4jrtff;Hli; If!��Fiii;?4i i�;�al1!ri3a fii4i465:'r> �'i•ii;i�i Independence Park is one of the oldest add most recognized parks that the city owns. According to the park utilization survey conducted with the master plan, this park had Total the second highest utilization of all City parks. Most of the current amenities at thelFTE Staff Total park are outdated or in bad condition and are in need of replacement. The Master Pla,l lists improvements to this park as a high priority. :a+Rig :':: u i;;;!n,r:r5l0i!° !;!:�I"�!'?t!i !PROJECT ovs, nocATION h!N 1.r!'','iu..li�`i AI :Piji!rtrfp`yy�II'><',kririt sr, d. , n.+4 L n�"P,.,I>' llr .lrr ,..� G Preliminary Engineer nq Report Land/Right of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS .H;{;!DING �lii!�i."l! ".fiE NDINakiV4 rmft5, FU General Revenue - Cash Certificates of Obligation Future GO Bonds W/5 Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees Unfunded 77ilR if 4k:I1ai:1Hifi5MIi!rtd`ari!kr4!f! sITOI;ArullBuoc`er , $29,437 $240,000 $2,778,000 $300,000 $3,347,437 ergedh:liD IM$130rola li 'CI L';tf!:;°In`.!kI:RWN�k'.:u�t: !Amon R0pjl.., APP,ROP�i,lIl! $29,437 $240,000 $2,778,000 $300,000 $3,347,437 IY BUD6ER$N $29,437 2013 $0 $0 'PR $YIP.ROAECTEOMAP.P,RO,P.WEAMTIONYM E,.:^LMAT::D,.''g q•N�'`1 �'i•,'�i fyr,al,! ;pis MT.. t€..,al: h 2O1F2."f41: , 20235„ u2014'' 7HROr�20191i 4 ° `t $29,437 $29,437 $29,437 $0 TOTAL BUDGETS" 529,437 $3,270,000 Other Funding Saurcest - $48,000 TOTAL SOURCES $3,347,437 ` Explain & Identify Type of Other Sources: From Zone 11 - Project to carryover to 2017 $615,602 in 2016 to be funded by bonds in 2017 $29,437 $3,270,000 548,000 $3,347,437 $29,437 $29,437 ESZMf-TO THRd2011. n ii,O14203.2 29 $29,437 2014 i!:?:1lJhf: a„1!N :IGi gi- 2015 11% 2016 $0 50 $0 1 $179,810 H 1 If P,ROtaMTO7A6 529,437 $0 $240,000 51,816,613 $0 530,000 $2,116,050 $60,190 $1,816,613 $30,000 50 $0 5179,810 $1,906,803 ;i1olltitiNTI!No4,44 nye 420114 SvP 4,:3IN$1$:$!I:IiiiMpi:+tVMMI i'a LTi 441MON ' i 4,PROJECT,.T OTAL$ 50 529,437 51,423,011 $0 $0 50 $0 50 548,000 $1,500,448 $131,810 $1,291,201 $48,000 $29,437 $0 1 $0 1 $0 $179,810 Project Manager: Project's Approval $1,291,201 Andrea Brinkley Date: 3/11/2011 CITY OF PEARLAND, TEXAS ,PROJ ECTrAAMEaj'„h:lya:;y.uFl 'Cfitf!5rtlly: ,if,.i;;:uiaa; gall Delores Fenwick Nature center -ph I 111�!hr (Gii�ll 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM RROIJ ECTus# P20004 .bc o!!B•;tEty„_;pl'y;. r, st p_ !;!s,A:i,l ,!!:,, th:d=.;li "u; ;il. r�1`u'eit•%iF`:+,P:k:'rvi!'^: �e: iti,;: •hai.a :y'7.y y;.{-:ae:r. P,RD',];ECTq; DESQRIPTION%aA.i•aeil'Nih!�d7171:{4':d ;4k? �g1A:>+.d•:iPilaj;i!tl ;e5:6C4a(=dh�:,,.L„ 3r;,t.,..asarrsa-?Fer, ip(fw, .,.:a�:,Pst,4.,l.u!bhuda: The project will include a 7,000sq ft LEER Platinum Certified building with an open ail Ex enditures pavilion at one end that would include: environmental educational display= p demonstration gardens, interpretive exhibits, 6 or 7 offices, restrooms, outdoor spray 'Personnel Services station and hose bibs, a classroom with a 50 seat capacity, 400 sq ft of storage. Phase II includes 2 miles of 6 ft and 8 ft trails, being a combination of crushe45upplies granite and concrete in low lying areas, boardwalk, pedestrian bridge, fishing pier, picnic tables, benches, trash receptacles, drinking fountain, and a paddle crafnservi CeS & Charges launching area and grass trete parking. Capital Outlay gi! h!iiPtini"h4}9!I , d;9'1" :Ili his project w dFYfAPea vl . RO 7 .:SON., ai; i „I,siuu. •_u�.�i'::w..::ev `, z:..liaaH. peoenti eocomd give . chi and a adunqt opportunityldto o600mese and take as a sser'mnd loearntabour far the community. on children/adults T isuwd be bele to come classes and learn aisutTOtdl the enniednment in a hands-on seating. This would be the office for the KPB staff. There is a FTE Staff Total great needTin the community to educate the public on the benefit ofirecycling. ofgreen ti spacepione trees. This would also provide , opportunity,to showcase the entire conceptli,utilizing one site as multi purposing for parks, recreation, detention, education, recycling, and environmental park 7tbp 1 g. Preliminary Engineering Report Land/Right of way Design/Surveying Construction Equipment and Furniture contingency TOTAL COSTS ,OZPRPERENC0460ER s ,n 0PE TSNG��-AND ,MAINTY ENAN =E' COSTS _. it , .x.. . ,1 R{Q .... .._ f.... ,.1. ....0 .;E, ..:iwa.i'u;L.wm+::k:..,..,...:. 2012 2013 2014 1040 j:( i;31{IllpU4lfii¢j><IIiG;!!➢!eflulu4lbtiOi!i;:!II!Ii fkdlt,Nip(+Kith!m'A1!mlp¢yq".$,'^,-,. P.h1F1,'j;PR07E,T;EDt{ E'RO'P„A7NEICAISyy';,j„fit;:ke I P,mYdl. . 0 1G$:;Fl6DMPNE§TIMTEfi 1 {G 1�OTOTALIBUDGETiTYAA,5P<N�g„DTggAx7RU51$100122OR3y14f14 $25,000 $25,000 $25,000 $25,000 uii, ..i„sll[yy,!epl(,, III' :Iii !'IiE;1r, I'$ii'�A�vi fid l'^tl Vi,lt }1 :ONRAm.1yq`y i'i!I''P:��iw,s i!71F„UNDiNGI; OUCE51( ARVi:u, Sr4,'pii� General Revenue - Cash Certificates of obligation Future GO Bonds w/S Revenue Bonds P.E.D.C. System Revenues - cash Impact Fees Unfunded other Funding sources" - TOTAL SOURCES $2,391,000 1 Explain & identify Type of Other Sources: possible grant funding in the amount of $500,000 from HGAC. construction to carryover to 2017 $368,353 in 2016 to be funded by bonds in 2017 $158,000 $158,000 $2,010,500 $2,010,500 $197,500 $197,500 $2,391,000 $2,391,000 $158,000 2015 $736,026 I I $25,000 $25,000 j $0 1 50 $0 $158,000 $736,026 '!!"!+'dlheiafry!i:!:alN:!ii$0111Nddi, 011ti4,`d'11iks:++Chlx.:Yt;1544b.^I{{;:p[. .h:ii ;'iSeAr;46tt?:i 't i1 r,LI �`'ilit{g ��: t:'pe+;a:wl:v„I. l �ryil*i,Ill,',5i i 4fl �}Fy �l go j'. §'y',m'��,f li"u:!':OL`pr 9N'. It tFUNUUED r ookTI,t,ATEDIN, tTOT.A i;?BUDGEPu wCfl3e^IIAP,IPR 'jflfl ij BBUDGETh.h$ kTHRU,T201]ae $25,000 $2,366,000 $25,000 $2,366,000 $25,000 525,000 2016 Ii7-iL=sitr{¢,':,IU':i�-iBlh)±I gle P.ROJ ECT„t;TO'r�'.Lt}.G. $25,000 $0 $158,000 $736,026 $0 $0 $919,026 $39,150 $2,391,000 $25,000 $25,000 $0 I $0 $0 $39,150 30 $486,523 5486,523 Project Manager: Jennifer Lee ]E ^:a Oh6 $0 $25 000 $525 673 $0 $0 $0 $0 $0 $0 $550,673 Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM RktifictAAmtgliPNVIMMIAMlikahRgisliqmou 0 Nomfammoocgg pkoiEtT450MUINWAStWaAkEAfiggertMOWNMORPOOTWA MIMS Hunter Park PR1501 Pl?ROCTOgOWTOLNAPOPOMMIMMPOWNWHOMMERYMWARNMMWv2ia300100*MMOOPOATOG000-SINTSNOWPSTsOWPMNOSOOPIO continue development of the park along Orange St. to include trails, Expenditures benches, gathering area, landscaping and/or a pavilion. Continue development of park as directed by council goals. 2012 2013 2014 2015 2016 Personnel services Supplies $5,945 $6,362 Services & Charges $10,671 $11,525 Capital outlay Total FTE Staff Total 50 50 50 $16,616 $17,887 Igloolithoosopwommirlh amoomogemmom6imiowsaigkoomRazEgTEptAerloqwwcapm5tielio*Iiargaiairagaillwilhoomitlighen, rikilifia6TRO54010166ikth Wittornligi MNIiiiNON ,6Wiiii06iiiidiiKaifill iliNcaltinial Nitititallipaille 'hiPtRialga "gi- "ECISSIgallikitigafiti id 411,1686;14 tiSdXpWariitit bigilitchidgiqfil; 441 ilitaldi1iiHtil,11:201SHAPA8 :49r kol4i4 Miaol"Oitt LIA,2631IS SitEtSotati Preliminary Engineering Report 10 Land/Right of way $0 Design/Surveying $80,000 $80,000 $80,000 $80,000 Construction $475,000 $475,000 $475,000 $475,000 Equipment and Furniture $0 contingency $47,500 $47,500 $47,500 $47,500 'TOTAL COSTS $602,500 $602,500 $0 $0 $0 $0 $0 $602,500 $0 $602,500 AkLip,mmsbtiggh. AliNNINAMEDI 10.0110040 General Revenue - cash Certificates of obligation $487,622 $487,622 Future GO Bonds W/S Revenue Bonds P. E.D.C. System Revenues - cash Impact Fees unfunded Other Funding Sources' - $114,878 TOTAL SOURCES $602,500 $114,878 1 $602,500 I 1 Explain & Identify Type of other sources: Parks Donation Fund, out of Park zone 9 for $114,878. ArM2fltrAtnNYink4SSORSigAigifilA40414i4Wiliii44ila4414WWW40140aMaNWWWW/PanMa0 lit!agegliaitapialeriliaptehritart Rilrrimilarges somasel 141;;Iiiipadetime eitmosidiut 1;o142biziKIS2ca3A NEolo' twatiAS Tp,-Roittiddremys $0 $487,622 $487,622 $0 $0 $0 $0 $0 $0 $114,878 $114,878 $0 $0 $0 $0 $0 $602,500 $0 $602,500 31 Project manager: Michelle Smith Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM lacii-Ecl-fl;:*A4ETANNAIMWOWAWAAUVAMITIMMFORTgelNO*NeANSI PER Fop for Future Bond Referendum PK1401 'kEt-litAttV.okOiel$MMIN040410RMILWMF tX03,EcnipES,CORSgNagginIONAMAllinggiONWAggernflaRIMMIWMPI4Mii4AnKalliNailKORERWOSIGIPANONONTE14,NOE-PAWMEAM1140 Provide funding for preliminary engineering on future projects yet to be Expenditures 2012 2013 2014 2015 2016 identified that would be funded with the city's next bond referendum. Preliminary engineering would tighten down scopes and provide for estimater,Personnel Services construction dollars that would be needed to take a proposition to the,supplies services & charges capital Outlay PROJECtlii0§7P1kAtIORM-Mrn3 1 10:1W1 1.111MAIIIIIM4r,.AbliG2i4MAK! voters. ilqVIAlitiql1"0144111041M14 Iffmott 40111TAT4ETCP5IVOINI-WV001 WhilildOtaWNIAMNAZ Preliminary Engineering Report Land/Right of way Design/surveying Construction Equipment and Furniture Contingency TOTAL COSTS lt!f" 04000$E4a 1„1FuND,I,Niti9.9Rogpl •WWWWWW1144n., General Revenue - Cash certificates of obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues - cash Impact Fees Unfunded other Funding Sources' - TOTAL SOURCES Explain & Identify Type of Other Total FTE Staff Total 0 50 50 50 $0 4RAIAMIRMOIRMIMMUSSOMWOUeth#RWSMOMMIRROjgCTEPM40MTAIATIONS6MadinganigngagginggiOlgaMiggR TOTAL.mo, 'GET' GITX4 PPgDPW IFLINDEul}3 !Rii20112M ;Alit '20I3'1,S, tIE;i2:014WA LA 2:0:•1 4,gt,r; 1320- 0..tRiFt03 ECTAT.OTAM 01.04.401NOTOMPOnSq&OWNOWTOPINIMPRMIRPOOPUMWaling $500,000 $500 000 $500,000 $500,000 $0 $0 $0 $0 $0 $500,000 $500,000 $0 $0 $0 $0 $500,000 $0 $0 $500,000 eineetialendilkledOile.intn3W4g4N*A4444'SgstObOnSAIlpignodnetgilgeiligigegilinendagOQOPASSOW,,i enelleoMinTole4,0:1SO46MnInlenOeagn,ilhg ;,1$10101,1f,j KijarnNali igRoping 1410±Alg2m nu t Atom gaol tip96,doem„iiiitre TOTAttleigUDaE74 CT-PCVA6ROF0 !;ELINdEthigribtEr iqrrERkiiiLZOInkt; 75Y.2012:;,' aii41:61t.;ItiP iPiT1!T2(1101FA;?4 1pRkatEaritatsalgi $0 $500,000 $500,000 $500 000 $500,000 $0 $0 $0 $0 $o so $o $500,000 $500,000 1 $0 1 $0 1 $0 $0 $500,000 $0 $0 1 $500,000 Sources: 32 Project Manager: Projects Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS P,RO b ECTIi' eAM EI li'i1:'9i h%, i;: zaill'ul�r:7i Sports Complex at Max RoacFPh 2 fn PROO,E,CT;t; D,ESRIP.TIOND�;,,,Njd:� Proposed improvements include six international sized (11 vs.11) socce Expenditures fields, consession stand, playground and a covered area for gatherings Approximately 1-3 fields will be lighted and the park will be locate Personnel Services inside of a detention facility. 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PRO]ECt#:1: PK1502 ,:,ai;l u19mf ii`i"O u`S afi"O fi�6C,n-": rW�i t'WV Y �:c U Gu"„uH" ;':NJ O {:,.,.0}„4tn�f�3,.;6:L.ifRf�IN..�.a'��dh.t�.,f!�:�c4�,...�,4'flh,::::iJ.o, .F ,.,�ltt:.`f-:fti:; 4..�iCiGl.awi!F.l'...kWu PROIEGT„ USTSEIt;F4dWi, a;, its c+ ti t:p,.w I[Iriai ;ilEr, � ��. ti�>"+:i,G�l,: ui�Hi`�:iit;q; � �:,;Ni r„i1i.���z':� u:nr Supplies services & charges Capital Outlay There is a significant need for game soccer fields and sports fields in the City. Witd Total the development of this facility Centennial Park will be able to be converted to facility for youth softball that will allow the youth soccer program, youth softball FTE staff Total program and the youth baseball program to expand as the population in the commw,:.y increases. nil Y,'�r. P. nciOCA40 Prel minary Engineering Land/Right of way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS 1FUN7n�rtCvi�iDZMG`( ;I ,I i $t '„ pRERATOIG;! ANOM21NTEAMCEp1;CpSTsMIBMii 2012 2013 2014 2015 $0 50 $0 ,,...m...;.�, r .,:,.::..:.:............�.. ih' 'tl,{U`mui it u::x.lbd3litt:laduV{41mdvlliil;taz!Nv.,c;ki�!ru1?iii;”h"istt:::d:!;:Ci;°;x...i..,•t,;<;.;`F>_'x; e:13;:Y ir. ; R�RD7 ' ;. EO:,,iiPPiLOP„ftYATIONS n' �� '% I44��':_nl! i; p f•iIi�l 4t, :.,..vw_ in..-_ ifa:i't ht,,n min! obubi��iN!�”` "'i 1I_ilPj{klAipkAM € DGEOS {.vW�ESiCIMAj1]11 Ii�,i{t3 i mwnii xi"i't•t? FTOTAL' BOGET� � TCITV 1APPRIOP.� B�10GET4a''}'f�r^THRUav 2011k r f ," 012 iri t.' ,043 aU :20174 $97,000 $97,000 General Revenue - cash certificates of Obligation Future GO Bonds w/s Revenue Bonds P.E.D.C. System Revenues - cash Impact Fees unfunded other Funding sources' TOTAL SOURCES $389,000 $389,000 $3,238,000 $3,238,000 $486,000 $486,000 $4,210,000 $4,210,000 $0 $0 $0 $0 $0 i[Ilia h; i4i`ii;lu gyfN{+ti`�'isiq�!tiN'mea+�Ihs;in':piC:iNni!NP?c:'i:0?r.'3; '}ili:Ma{:i f i.;;��i:,lthi,:lt�{�� T4ilii � ` . ARPR0P 4,, ORAL%BLDG Tiny + ITY,' APPROP.I'1'�f+:i $4,210,000 $4,210,000 $o 20'15p. s $97,000 $389,000 OliziatiMAU 2016 $0 42016 pRd7 Ett roTAC• it $97,000 $0 $389,000 $3,238,000 $0 $486,000 $4,210,000 $3,238,000 $486,000 $486,000 $3,724,000 1THRU: .201 $486,000 1 $3,724,000 'PR0$ ECT,toTAl t'' $0 $0 $0 $0 $0 $0 $0 $4,210,000 1 $0 $4,: 1 Explain & Identify Type of other Sources: Future Bond Referendum 33 Project Manager: TBD Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS P R071ECT'8W16!!!O ;lip. Shadow Creek Ranch Park Ph 2 PR07ECT*DESCR5PTION0W jet 11' !I, 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM P.,ROJE81800 PK16o1 Project elements include eight lighted baseball fields, one socce twelve tennis courts, parking, a hike and bike trail around the playground, restroom, concessions and shade structures. The Parics STSFIGAT,PO, �-�'"Vfr 'N L', ;; Su;C complex in the area. field xpenditures fields, 'Personnel 'Supplies f,REFERENCEjdr 10 00,88RQTSNG,,',AfJ,U'N'140NTENAN,CE0tOsT5_`:'.v 101 1 2012 2013 2014 Services Services & charges capital outlay 1 t,L.iswam, t:�="�� and Recreation Master Plan calls for a multipurpose sportsTota1 this area of the community to serve the anticipated growth of FTE Staff Total iPRO7ECT OLA Aviv Preliminary Engineering Report Land/Right of way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS A �tiLR TALiiiBUDGET CTM*APPROPe ftBUDGETkl,, $216,000 $216,000 $862,000 $862,000 $7,186,000 $7,186,000 $1,078,000 $1,078,000 59,342,000 $9,342,000 50 50 +16,10fi P„RO?K05EDUARP.:ROPRIATIQN$B4, atSh1�1YfEOlI ite1220iii 20120'130 2015 50 50 2016 50 $0 $0 $0 50 50 s;N'Mil;'P,ijniiiiii iiiiiilii:'+0:i4:aVu;uiib'!d17t:0:100004:eEath4001'tq;':a3wIA`iP100 iHr000 R" i'114"� +i,U 4 if''y:' :°111.11664411.00g#1 -y :rt,:...:,.,,' }t�!� k Il MATEUpkip,.alyd: .aCIT.1i' APPROPs J':.I BUDGET.,: ia.THRII„ 2'00Ii r „+2012 General Revenue - Cash certificates of obligation Future GO Bonds w/S Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees unfunded other Funding Sources' - TOTAL SOURCES $9,342,000 $9,342,000 $9,342,000 $9,342,000 1 Explain & Identify Type of other sources: Future Bond Referendum Construction to carryover to 2017 20 'P. RO7ECTO.TOT:AL`u_ $216,000 $216,000 $0 $862,000 $862,000 $0 $0 $0 50 51,078,000 51,078,000 iia:o v5000i1ti+tisii4a'6:_,d',1:?s;:A;x1;+isNo,luri=iE850 rim- 44 i' t2'001. 2OI$�1 ti 26 2 51,078,000 50 $0 $0 $0 50 50 51,078,000 Project Manager: 34 8k67.ECT T TAL 50 $0 $0 $0 $0 $0 $0 $1,078,000 50 51,078,000 TBD Project's Approval Date: 3/11/2011 CITY OF PEARLAND 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM FACILITIES rojeettkd FA1002 FA1302 FA0905 FA0904 T50071 / FA1203 FA1101 FA1201 FA1202 F20002 FA1601 ilrf lit Protect Name; Traffic Sgnal Operations Improvements Fire Station #3 Reconstruction Old Police Department Renovation City Hall Complex Renovations Hillhouse Road Annex Fire and EMS Administrative Building Service Center Modifications West Side Library Store Front Tom Reid Library Expansion Fire Station #2 TOTAL tjlflilti'.;iitll4f�l iiulil�"�;'j1,• 50,17,RCg' O�efFiWNDS,'uh General Revenue - Cash Certificates of Obligation Future GO Bonds WIS Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees - Cash Unfunded Other Funding Sources TOTAL 3 rm,uy ` #.w mei rrtr tr 2,500 000 669 868 644 565 651 000 35,000 250000 35,000 550,000 $ 620,000 $ 4,715,433 j20A7'41,''�f 015 2,050 000 2,822 423 2,750,000 o.s 4,550,000 3,492,291 644,565 651,000 3,035,000 315,000 3,348,000 3,663,000 35,000 550,000 3,663,400 432,100 432,100 $ 3,780,100 $ 20,716,356 3,663,400 $ 7,622,423 $ 3,978,400 2013 550,000 2,545,433 5,982,423 S'ilrxr'IL ttTOTA VPIN 9,077,856 882,600 2,780,800 3,663,400 315,000 3,780,100 1 4,095,100 70,000 2,170,000 1,640,000 1 3,880,000 $ 620,000 $ 4,715,433 $ 7,622,423 $ 1,197,600 $ 6,560,900 1 $ 20,716,356 35 West Side Library Store Front 2012 Fire and EMS Admin. Building 2015-2016 Service Center Mod ifications 2012 City Hall Complex Renovations 2013 Fire Station # 3 Reconstruction 2013-2014 Ctty 'earland CI® Fadlities 0 City Hall Complex Renovation 2013 Reid Library Expansion 2015 Fire Station # 3 Reconstruction 2013-2014 0 0 Hillhouse Rd Annex 2012-2014 Old Police Dept Renovations 2013 Service Center Modifications 2012 Fire Station # 2 2016 West Side Library Store Front 2012 Fire and EMS Admin. Building 2015-2016 (Proposed Location) • Traffic Signal Operations Improvements 2013-2014 0 1 This product is for informational purposes and may not have been prepared for or be suitable for legal, engineering, or surverying purposes. It does not represent an on -the -ground survey and represents only the approximate relative location of property boundries. 2 Miles N GIS .0!I!iYub.rr ;'fH!9C"S;Inj,� THIS PAGE INTENTIONALLY LEFT BLANK 36 CITY OF PEARLAND, TEXAS PROJ'EGTJNAM'S' 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PRODtcfik ^' :i-Wiiij:1.ri{!_iriiil IVgi t:7iNiP:%;rN'':�� gN Traffic Signal Operations Improvemen PR07ECT5D ESCRIPT80Nii} 4!(;;' FA1002 AREFERENboiti RERL'tN"h.'z;ig ,,m iiilmn n:SI!�cp; (i'"=t"'C !'1i`!k:: t.• �_,f!d'i!Y:.!"�'!=h`.�;Fnr;i..S.i'i`'ni'!;v`jOHERATINGi HN6dMASNTENANC!7COS.TS;•^sY.+1Gpl;l'r,:A=:•xi4;.�::,a :nv.?>!upgrede,.r8,!.ntk�..lje._.!equipme+,!o -.! .,. - , i ...4 «,a t'fl ..o . , s� E,t .. ,: : As part of the takeover of the TxDOT Traffic Signal system, upgrade controller equipment, Expenditures 2012 2013 2014 2015 install Pan/Tilt/Zoom (PTZ) cameras, install fiber optic and wireless communications, and p install traffic management software for City's network of traffic signals. will design and Personnel Services construct a comprehensive ITS comunication network and other components for real time traffic monitoring, assessment anddemergency response management. Install equipment for the Traffic Operations Center. Supplies Services & Charges capital Outlay PRO]ECTy3NSPI'61;CAT10NI ,5.M'gif';1{iillF;!tL1P 5d"U,F'?ie"".i%?P.h'hn'.fk!l �Il:jtj4 iffl!r:,t'!41 .'y!1'I 'I, i.i° FPI h The City is taking over an aging system that in order for the City to maintain the system at Total an acceptable level of service, the system must be upgraded. Upgrades would i nclte upgrading old TS -1 Controller and cabinets to make them compatible with the Siemens syste�FTE Staff Total installed as part of the DOE Grant. In addition to that, the scope includes installation o fiber between Cullen and Kirby Drive as well as between Liberty and East Side of town. The project also includes upgrading the communications by providing wireless communication all corridors, which includes E 518 (in the long-term) creating redundancy and a more reliable network. The proposed scope creates a Citywide traffic system allowing City staff to manage - the system more effectively and efficiently. Funding of the project will be 20% City and 80% HGAC funding from CMAQ funds. j'iPPRO;ICT!If!CO$!TS)}AL'LO,endiv Pl1TSAN} N<e ngx;xgd♦!p':1,,'����ty'I,,4h, { :,ip�!f;4ed@:Rfuh+ndi.".R,1'as�iq ;�tltip'1iU Preliminary Engineering Report Land/Right of Way Design/Surveying Construction Equipment and Furniture contingency TOTAL COSTS c. n ia!i;N9 ! in wi=3 ia!llitWi �i?t General Revenue - Cash Certificates of obligation Future GO Bonds W/S Revenue Bonds 50 !+idr.'tifiiOirdpSCtiWiF'AlflpP: !ikS�imrttl7chmull:r"liadaFyapg03��ry� T4 DI A.ry'rP.,P,,ROPl2T#TTANSWE6$ 4 ryeIiaIW6fluy._IM"ED4"41144% TATAO}gOGETS GITYoAIPROFUNDEDI6�ODGT!L'n2003i4Fieu,20,13Z &2b14. 5458,850 $458,850 $458,850 $458,850 $77,700 577,700 $77,700 $4,550,000 $4,550,000 $5,086,550 $5,086,550 $77,700 5536,550 $536,550 $2,500,000 $0 $2,050,000 50 $2,500,000 $2,050,000 Iq.t.A!n i$ W: i i.r.^liWbE ri4:i:NEl(,,;;.1q:in iiU^.O;it111H 631p!I.:la „flEFI !isl+mf}!::iiFg's;:1i41rPfRN. Y AN« u:bSidStif!d?$kIIi&0.:IYPli•xf:!4Ii V'i 1'yy�M1�;+.r... :6I. { i oiAuthubGET iiraT JAPPROPI N L F NDEi 6006E7rj1¢-:.'T'HRl) I20`Ji12't•;! 1, a� �'� 577,700 $77,700 $77,700 $77,700 $910,000 $910,000 System Revenues - Cash Impact Fees unfunded other Funding Sources' - $4,098,850 $4,098,850 $458,850 $458,850 TOTAL SOURCES $5,086,550 $5,086,550 $536,550 $536,550 Explain & identify Type of Other Sources: Hillhouse Annex Project T50071 contributed $458,850 in funds HGAC TIP Funds in the amount of $3,640,000 in 2013 & 2014. 20% City match required 37 50 2016 $126,468 $85,200 $01 $211,668 3 SO $410,000 $2,000,000 $1,640,000 50 52,500,000 $2,050,000 Project Manager: $O 50 >!� $s .PR07 �EI.OTAL'41 $458,850 $0 $77,700 $4,550,000 $0 $0 $5,086,550 E. t r.l: ., E ,r7A I. $77,700 $910,000 $0 $0 $0 $0 $0 SO $4,098,850 SO $5,086,550 Public works Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS IAOditi-tOMeWiliONIWINUNWS160$6110404g4104 & 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM ;1111111,11thifitegiloWAtrj, PkorlEct-r1j#141-n1J111,J'atti:f,111,1111411), OkEFEBIB141cD4oltobelF1411111441.11-MirealliligiLMSfaiallarmii Fire Station #3 Reconstruction IFA1302 v304EcT04-P.P,(..114)0VAT644.1311050104iliaiddiflikelft$ORANK404, 'rtiriiiiagg4ARfirgrOMJUNOFONT NGOkNOm4INTENANt0051-01424TIWNStesil construction of approximately 9,500 sq -ft. station to house personnel Expenditures 2012 2013 2014 2015 2016 from Fire and Ems, including dorm space, kitchen and dining area, day room, offices and exercise room. Also included are 2 apparatus bays, Personnel Services gear storage, medical supplies storage, electrical room, work room, and Supplies $2,500 $2,500 $2,500 hose storage. lizOtawNoljghtgire&1010kkgROWNWAthWANWSMIONNOWANKOWNS Rebuild / Relocate Fire station 3 to accommodate 24 hour operation and include EMS housing. ONONNUMWOMMOT ilpgs t VIAMISainkge Pre im nary Engineering Report Land/Right of way Des'on/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS oegkomammwmail ForotoqiowE.0 etimi General Revenue - cash certificates of obligation Future GO Bonds w/S Revenue Bonds P.E.D.C. System Revenues - cash Impact Fees Unfunded other Funding Sources' - ITOTAL SOURCES $3,492,291 I Explain & Identify Type of other Sources: alawirci miilmoolanigiammoimmsaaimmomitoom p101011-0•4111 4VER6614 ittA Theth5Gthihi keiWiegbpkeRlitig 41PABPd.61% $45,000 $45,000 $400,000 $224,868 $2,293,686 $70,000 $458,737 $3,492,291 $400,000 $224,868 $2,293,686 $70,000 $458,737 1 $3,492,291 1 SO services & charges Total FTE Staff Total 50 $25,000 $25,000 $25,000 $0 $27,500 $27,500 $27,500 Assumes volunteer staffing and reallocation of three rovers 11441140104Am0ucTEEpAmKogRIAT;olisoU1,' alAwflawinossmisteweag IregifiAnb ant tatiliM LPgtitgatiiathiagnini iSQEMRriiiamggaatsi4 $45,000 $400,000 $224,868 $2,293,686 $70,000 $458,737 $0 1 SO $669,868 $2,822,423 $45,000 $400,000 $224,868 $2,293,686 $70,000 $458,737 $0 50 $3,492,291 plwgigw6iplampalwavionfmnomwwitiaiArilmaii,2g.iftw;aluglivomlalicHlign!,411g&i4EikAimaghi,A4,iai ParliWiligierlfpgarri kr0146i0 :1410.00101,RiMitiii,%1040,101,hif giSILIBilbah 814-0g0frk6ca ntireedW4 nifigvdaatial0 Kkeogaijoi-til $0 $3,492,291 $3,492,291 $2,822,423 $3,492,291 $0 So SO $0 $0 $0 1 $0 $3,492,291 1 $2,822,423 $0 50 53,492,291 $669,868 $0 50 50 $669,868 38 Project Manager: Jennifer Lee Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS PROJECTu NAME(AJ+PHSPAi Ftl U: ,.,, n:P. 1Ptm Old Police Department Renovation 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM i,5n732hxnlnnPlNisiJYtJ;.Nd;tadY.ah! _v "dv PRO7ECfn/,�31-0ubi>Pd:p4h4fy.aalv:tlHh9fiNr PRE_FERENGE}ORD__-Rrsfrtly_Ni_ssiNP.-h}rhaPC:&hag-t%,vl FA09053 PROJBCIij}OESCRIPTIONdkj.'e; li N'•,-.i3ii!h lFl ..I. �tIi, Renovations to the did PD Building to accommodate re stating several department5:Expenditures from the City Hall complex. May include adding windows, new furniture, remodelins lobby/receptionist area, additional parking and landscaping. Departments may:Personnel services include Engineering, Inspections, Planning. Includes CAT 6 wiring and upgrade t ,Supplies phone switches for VOIP. After an evaluation of the facility, HVAC replacement, plumbing code, and electrical code improvements were added. Services & Charges PRO]Ec1 UJUS,TIFSCATION:IwPu h:i laailOL Lp!L'141i'tl'r}pZ;4tithh±{Hlll'ih`I'7LIii$:;NritnG4?„r,'f °+a'm"1:6P- To provide adequate personnel space to accommodate the City's growE . To reuse thr'Tiotal space the building needs to be brought up to current Unified Development code <000r and Code requirements. Scope amended to include renovation of the entire facility. FTE Staff Total 1 app, CT1GOS,TSj.ALib i.�,1A ilii{15 !ri i}dpi; IGhlh!ii.'1(71 u:OPERATING}.'AN011MAMNTENANCE660STS6f:`,iYW4P4 PG P `C`}',-`:lCl"PP fWPWll, 2012 2013 2014 2015 2016 $40,000 $15,000 $41,600 $43,264 $15,000 $15,000 $01 $55,000 $56,600 1 1 P .sis;kNiiifkia:iiiiPlail:kkakaltliliP1rstilUanalliirtikETP,PROPECTEDICAPRROPRIATTPOMOLISSMAtakikatifl Preliminary Engineering Report Land/Right of Way Design/Surveying construction Equipment and Furniture contingency TOTAL COSTS N4ig'iiiia't)!!rij''1,CES1:y NOINGhISOURCES Ililit IPI1 W{iO General Revenue - Cash Certificates of obligation Future GO Bonds W/S Revenue Bonds System Revenues - cash Impact Fees unfunded other Funding Sources' - fl.CIIV.APPkoi:4 iv ,?.'FbkigketikEr., $186,882 $186,882 41,806,553 $1,806,553 $230,000 5230,000 $30,000 $30,000 52,253,435 $2,253,435 41,j:ff ,10$gpu::il4ipi,iRRir it !''Sr'fr4iA0TCLuusPPf0TLjB0E1I IIPPPAPR,Yh1 5474,565 $474,565 $1,778,870 $1,778,870 TI tTOh?7R' k y.NN �1' l„;_2011ri h - .2012 441P42° ..n2 O r4>' . $186,882 5186,882 $1,421,988 $1,421,988 $1,608,870 51,608,870 ''Is! I7, "(';NI �s',izrvtii4m.: rxzu?,�;1{ �s1JDGE�'`i:l�i'.t��#�•;t';r'.1u2o11 a4 1; $1,608,870 TOTAL SOURCES 52,253,435 $2,253,435 51,608,870 ` Explain & identify Type of Other Sources: Fund 201 Fund Balance -Interest Income earned on the bonds & savings on Public Safety Facility. The City will not proceed with the construction on this project until it monitors the effects of the economy on the City's financial picture. 51,608,870 1 $1,608,870 1 50 $384,565 $230,000 530,000 $644,565 $474,565 $58,264 1 Se 50 $44,995 $15,000 $59,995 1 q� NJ WAR 201'S>k7��t, rh'�iisiGl_2'Og1G:l:,'e'iM, :PR�EC-TfIrT.OTALCW $0 $0 $186,882 $1,806,553 5230,000 $30,000 SO $0 $2,253,435 l 1 $170,000 $0 $644,565 50 1 $0 Project Manager: 39 Ma:[ {h a,, PROJ.ECT,� iTOTAL�yt� $0 $474,565 $0 SO $0 50 $0 $0 $1,778,870 $0 $2,253,435 Jennifer Lee IProiect's Approval Pate: 3/11/2011 CITY OF PEARLAND, TEXAS PRO] EGTit,NAMEp;Vf 4aif1!v rtiin4YlM1vSs. U!•:A+Fscv City Hall Complex Renovations P.RolECT'DESCRIRTION:.I t'':P•r,: i."::.�st'Pili s' g �:'":! vol:, ;(IQ4 y"., - _ _ __ 4.'"_._ J'an�,. _b 1,.__'r 19�(I_Iii i�lf•Li--_.M�1�____�.:Y,d : _!N_ .r[ir'i,.4�h:n ,i!NI:'=; ;4..m'LN.u,r. ; � ' �.:ih:'41: I; a '. .aa.an:,m va::;;:c:c:rr:w,::amrnu.zt¢ceu The City Hall 1st & 3rd Floor renovation will include moving interior walls,Expendi tures painting, and replacing carpet. Some HVAC duct work and plumbing work will al.,.. be necessary. The Community center renovation will consist of possibly using the Personnel Services existing windows above the drop ceiling, moving interior walls, paint, and carpet Supplies replacement. Some HVAC adjustment and plumbing work will be necessary. 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PRO]ECf#G";41Je.wn(v6fiTr= EI;6aly`ijiMPULPk&ERENC ORURs+rih$"eiiii.-Y;i-.fsl .- FA0904 4 Services 1 »,. & Charges PROI.ECTIJUSTjI FICATI0N1'i'V!iria;,?fi;i�i!Jt!'uli'lt]l:d5dt.!t,y ;,'pletA,ryi:i2u;R!!i0lin""isd!ks$g1d?C`?r.`f$Slbe!n$iui:f Necessary to meet needs of the remaining user departments after several Total departments are relocated. The 1st Floor of City Hall will be modified t accommodate the needs of utility Billing and IT. once Planning, Engineering, and FTE Staff Total 1 Building Services move to the old PD, the Community Center will be modified to accomodate Parks & Recreation, Pr -ejects, Keep Pearland Beautiful, and Public Affairs. The Administration wing of the third floor will be modified to accomodate a larger Mayor office and two Assistant city Manager Offices. IPROJEC s 'u4;fr' 0$114 STS;s4S Lope Preliminary Engineering Report Land/Right of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS # ;. isOPENOAND YAINTENANGE?SCOSTSU M ING.4 2012 2013 2014 $0 IFts,rpWAPRROS6921ATIONSjii $0 2015 $100,000 $631,000 $20,000 5100,000 $631,000 $20,000 $751,000 $751,000 eneral Revenue - Cash Certificates of obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees unfunded ,i::nht44dlnL:,w,w;dmt;!trz t �tll�•p{'LAPPtR 17�5l14'2(�tN�r"II4i IrrCIT.1','IRPPROPkmFUNuEDABUDa $100,000 $100,000 $651,000 $651,000 Other Funding Sources' - $100,000 TOTAL SOURCES 5751,000 ' Explain & Identify Type of other Sources: Remaining Fund balance, Fund 50. City Hall $215,000; Community Center $536,000 $100,000 5100,000 $751,000 $100,000 $100,000 $100,000 $0 :gniivit::deiA1t44,piboitt2H,„^1�e'46viv ESrIMATDj1y3�12) ��mm � re v hqF' v rf 2012n7'givi:l iitiv201ie 40 $100,000 $100,000 $100,000 $531,000 $20,000 $651,000 $651,000 SO $651,000 2016 $0 $0 TWE 2016 ., E01200 GTwlpOSAL::;,. $0 $0 $100,000 $631,000 $20,000 $0 $751,000 $0 50 50 IJr;. J![,'h-�1!n:�idrl`ii;llkh'� 2O15m ! 2� MM1201e:11 201e:1:il!:' FRO EC NTOTAUri $0 $651,000 $0 $0 $0 $0 $0 $o $100,000 50 1 $751,000 Jennifer lee $0 l $0 Project manager: Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PRO1ECT" IINAME3ALIIII0ILIII0.01203ELI30000000131IIIIIISI0V103330131:33011803%allihIIII:0311:2030ICP:1310I 000: PRO1.ECILISLI:c.c3*33III3S1014'0•YatI9010/032I42:33001100105ICIII ORESERENCEWORDElt$00340004h0002Itisgsgls0 i4 . AL0,21402.3„20430t RTI1 fibusihii6atTnTi ek ------- - -- ---- - 4500717-7,c203--- 5 - kROJEC2.2.DES,CRIIhTIONi2RhhhhiahhhltathRhg5h$hi451151114-15ithihilhhOilihRihRhORM51455MILhfutth$52ahhg 122244$511$55:$2$44401hiiihU5R9=5545ifilhDIRERATING5AND.514AINTENANCEh"OSTORaPhillikaillghrhfidifthib2h1.!Rif$S505PANRehh 71;177ITEC9ITUTOFtEcheTby owneT by the cit W6775-15777FIT-On Ail -Mouse Road. Expenditures 2012 2013 2014 2015 2016 Phase i of this facility will include a traffic operations center, lunch room, locker room, fuel island, and equipment laydown area for city crews, police, etc. Personnel Services working on the west side of the City. Phase II will be fully defined afteisSuPPlieS $10,650 $10,650 $10,6501 810,650 $10,650 development of a business plan and approval by City Council. Conceptually, Phase is includes a Fleet Maintenance facility, wash bay, and material storage bins. services & charges $5,000 PRini6Gig_dUStF;CATiON6OfYibPdR2ihdidAL&dak:022TidigqitthdgiiiidadifigkiiM006444dNRWlild@ift Property was condemned in 2004 7or a city facTlity. -r-ifn s work -will -make best use oTriotai the property while reducing time spent by employees in traveling to the service center for fuel, lockers, and equipment. FY2012 Funds will fund a study to look afOFTE staff Total both the Hillhouse and orange Street Public Works sites and determine future use of those sites. The study will take into consideration the potential future relocation of the EMS Administration, Fire Marshall offices, and Fire Station 1. Expenditures-PhaselOnly $55,000 $15,650 $65,650 $56,600 $67,250 $56,600 $56,600 567,2511 $67,250 giptdidaiiiihNWROiefigii,d410 OMIMR4015414$481.5050151$SRMOMPRISigillgaihih4555h5ValiRhtfftgaRkinatahthWihnsitaRthatGaExtiosOs&O$600,0dIRRoRRIATIoNsSFWORdbaRlia&aSSArnalh$64fivadRia&diRsa0521tahhdsliqhhhx&ddiagailim1RM&SRS 0010riiiicerpsatm loAnisibbsi,oistrathp, EsilwgEDJR419 ;i0•3/49041-1. 19119RIMM.rir rditerd,""2-, 21 Rh Whhh$ J12-51h1h 4illhqq!fihhlhhhhh h Il_rTelegaIRRAEY APPROO.P.; hINDED.r BUDGET'Ygghrtc 4112 of it4 ot gaa.if620181illikid ..inikii;logigki. E, i$A$2thibaga, 4:4 kolia-tioit Preliminary Engineering Report and/Right of Way Desiqn/Surveyinq Construction Equipment and Furniture Contingency TOTAL COSTS i400NR,N,op05410g6,_, 11404 ,4iiAIokcEstivip NINAIORV-!giAmIldindAiliv,d11 eneral Revenue - Cash certificates of Obligation Future GO Bonds /S Revenue Bonds ystem Revenues - Cash Impact Fees Unfunded other Funding sources' - 535,000 535,000 $35,000 $15,599 $15,599 515,599 $15,599 5822,104 5822,104 5572,104 5572,104 $5,243,879 $5,243,879 $2,793,879 $2,793,879 5350,000 5350,000 550,000 550,000 $250.000 $2,450,000 $300,000 $6,466,582 $6,466,582 $3,431,582 $3,431,582 535,000 1 $250,000 $2,750,000 1 $0 $0 $35,000 $15,599 5822,104 $5,243,879 $350,000 $0 $6,466,582. i2g4t6t:551,01411,13-1a .0-41.1211,5nii4f M9,1443hi At,t1-044(:;15:11-4145-tqi.p.,“a'214",tWi!*-ii,1-:: Ttra'*jt-om2PiegWri MiVgettiltrANIMII 11!,iitiSklitgthi; ,elidisnANNI.,-,1-016* diVetatie $880,761 $880,761 $3,000,000 $3,000,000 52,585,621 OTAL SOURCES $6,466,582 Explain & identify Type of other Sources: eries 2008 remaining Bond Proceeds on Broadway - NOT mentioned Hill House Road. 458,830 transferred to TS Network. $880,761 5880,761 52.585,821 52.550.821 $6,466,582 $3,431,582 $2,550.821 $35,000 53,431,582 $35,000 41 $250,000 $2,750,000 $250,000 $2,750,000 $0 ['rodent Manager: Project's Approval Date: $880,761 $3,000,000 $0 $0 $0 $0 $0 so I $2,585,821 I $0 $6,466,582 I Skipper Jones 3/11/2011 CITY OF PEARLAND, TEXAS PRO] ECTMNAME!::jryiRiji_:iiI1i;`si )1a"h ,p'I ;)r ii! ilPnil,l;+ills{{ Fire and EMS Administrative Building PROJ Ecr DEScRYP.T;ION!j&ej i!2 1{XS!aii""vitili;•!'i:f!f;[Mp!FII 1;1 li 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM pRbaktI#11tligallg FA1101 --- Create a facility adjacent to Fire Station 4 to accommodate Fire and EMS Expenditures Administration offices. Approximately 11,400 sf will be constructed t., include a training room, plan review room, restrooms, storage, break room, Personnel Services conference area, copy room, and locker area. [supplies (services & Charges lCapital Outlay P,RO to-i'tiigUSTi FL *TION'Ut!tN'lil{liNi[{.+;fifli{{k'ipi4W tts,?i!iyl,.i� 1 aj i!::)Y..(.; Y.htl_ii!'.;P ,!° rY, .w bt ddb 11 ii, !i�t� i?: '[�J O'Irw '* )x° i!:a�!i,p :{v iiif `:il i l,ih. n ,: Create a centralized Fire & EMS Administration near the PSB and EOC to Total compliment and enhance coordination and communication among emergency service departments. currently the administration for Fire, Fire Marshall, and EMs FTE Staff Total are in three different locations with inadequate space and functionality. COSTSALLOCATIONi Preliminary Engineering Report Land/Right of way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS ttra;d!,11hG!t2O1CFUNDNSURES iafl42A+ .f4,4 ttn.j General Revenue - Cash certificates of Obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues - cash Impact Fees unfunded other Funding Sources' - TOTAL SOURCES i Explain & Identify Type ?Iiiiiflill6Llll!a1$1 y4!r_I! !it!hLM 1liW4ll!I: Ynfl M IOTALBUDni igCIh ArR0RGo ypqryr :F. {[j!:P,REFERENCE}`:ORDER_ii)L_Lm_� 6 rO'p,ERAj NGMANQKMAINTENANC,660,,575161ia ),rG1Eati! ")9i:i!M'i 'l aCggifga'. 2012 2013 2014 2015 2016 J 50 0 $0 $0 $0 50 :SN:eF:Y,fa,PRO',JECTED waRTR%ISAT1aNS.va,Fkm"'r' u} ai Ml:'P'i a}F;:i!fl=ab2' itra"F,gti,K'a*,jN?;iin ;PR07ECL:� Y.OTALiie $0 $0 $315,000 $315,000 $2,879,000 $2,879,000 $75,000 $75,000 $394,000 $404,000 53,348,000 $3,673,000 LY1-n>Pa 4' rESIMA�TED'd6t &`1� ref FUNDED5 BUDGET, h!$1HRIJF.2010.1i1 2012x, � ,`L013 tk Sit:2014,_ ,4,a,1201i5 $315,000 $2,879,000 $75,000 1 $404,000 1 $3,673,000 of Other `I.N+tf5illti ttli a aTAa it BaID E1I TOTAL!)�BUOGETi $315,000 $2,879,000 $75,000 $404,000 $3,673,000 N MlIitliGr'+F,liil:inie iiirt�F`n NXh mi tt, {, r� �ahlt�R8.+j C,I�hYN APPROP.St..I $10,000 $10,000 510,000 510,000 50 50 50 5315,000 EtJN fil'' B DGEii ,FUNDED„BUDGET $3,663,000 $10,000 $3,673,000 Sources: $3,663,000 $10,000 $3,673,000 $10,000 $10,000 42 !d&I?:nq&�tralu r!:&iattla valiv tN4: 4 ;ttri4 ES hilaTEI±±II4;!t g04I€ioii.ae"�M } 1. 114RU '201511 �`, „M.la`2oi2'-nG 1,92013 L2C0.4 $10,000 $10,000 $0 $0 50 zp t,:h'I ,* uga4g.4. ItaN*s. 2dT6ia�i'liJ+u llPROJECI$70TALl $0 SO $0 $0 $0 $0 $0 $315,000 $3,348,000 $3,663,000 1 $10,000 $315,000 $3,348,000 $3,673,000 1 3/11/2011 Project Manager: Project's Approval Date: Jennifer Lee CITY OF PEARLAND, TEXAS eROJ'ECTjINAME343 It Service Center Modifications P.ROJ;EcrOc8CRIPTION1iijj: ii?lj i; ;li`?;•^ hllit::,r';G,`:ill!iPSgN:i+; iA{9ta!!1@i4fiYit'dai'£14,i';f 2012 — 2016 CAPITAL IMPROVEMENT PROGRAM P,ROJ EG'r FA1201 i,lgr',ve�niAliI'4tptihtrdll$-odREFERENCE-ODER4hi+4f"m,-S, JW$4Fia.g _Ai : 10_ 8 ANI:8 7:4$1r;{'s.:;9OPERATING(I O$1441,TENANCE4COST,SN#l+ri!'Wgym?!ljldi' RM!'a: 9j[Ga:i'41 i,. t,.x:. Expand and remodel the buildings and facilities at the Orange and Old Alvin Expenditures 2012 2013 2014 2015 2016 site to accommodate additional offices, training facilities, and e.,a..Jcs shop and equipment areas. Preliminary programming has been completed by Personnel Services Maintenance Design Group. A full scope and budget will be developed in Supplies FY2012 based on the revised Hillhouse Public Works Annex project Phase I and after the Hillhouse Phase II scope is defined. Services & Charges 'PRODECU 1'Ji05.11 FICATION?njliu'1l{imm1{ii2ii,e1it 8;ltiaiiiji;u``ft93 ,,lrt3i4l,i i3 jIA;l3G1h4' "i,i 3i61i, 3'5B;i1 ;3 )'3I43 1) To make the Public Works Administration building ADA compliant. 2) TC Total $0 create an appropriate training facility to be used by any City department. 3) To expand shop and equipment areas to accommodate an increase in FTE Staff Total equipment and workers. 4) To remodel existing buildings for use as offices. 5) A need for office space for personnel housed in temporary buildings at the Magnolia water Plant and the Service Center. vi.a;, {'''e.•.C:r 41vlfi l,�. l,r *NA '.! u • l f. dCOSTSLLOCA D Y,1xiLjYL" N.. @dO6llTilAA p-iDh{:'d01�41 aI }r^i�Yt85r15i 6s i 1T.hY.ten iMM .qBUDG'lPlanT?60P-R0P43:1 BUDGE,FU.D„ 835,000 $35,000Preliminary Engineering Report Land/Right of way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS !t;'i;jlyti:�r(�1N9 ,?"uw"i:rft:lair&NGi3�i. I=UNDINMSOORCES� I II I General Revenue - Cash Certificates of Obligation Future GO Bonds W/S Revenue Bonds System Revenues - Cash Impact Fees Unfunded $600,820 $7,140,881 5221,134 $7,997,835 $7,962,835 $35,000 $0 31311191161331414311151113881 9l}lFjie,%Mt4h11�W14, $1'CaFid:APPROP18 f Other Funding Sources' - $35,000 TOTAL SOURCES $7,997,835 ` Explain & Identify Type of Other Sources: Phases to carryover to outer years. PER to look at base assumptions. Numbers not included until scope refined thru PER. FUNDED] thlobE $35,000 $35,000 $0 l' # 1 F1' RO ECTE A !i ri1 .I. I %n F 4 .,. 1', i?RD v+.m: >P t L, :"'AS , f " � i fl.r, ".,d A. I p 1. ESTSMATED:�I'I t�4 I�rrii:,tllf8,j j�EN zo 1 ll TSi �:ik.,:i ITHRU'$201�7,"� F mt201211.'� �1 i20$3;_ t :h 102014,'4 $35,000 $0 $35,000 1 sus imusubia's ESR' �MATERtil 43 $0 F12013 sL81 f1114$1f- kize14b $0 $0 $0 50 S 'iin+a-1.n'.f`4..rh� �rcil,.3µi}'.1�A .,rrr 20T h" '! ft -n20S6 $0 It $0 $0 3331333 IL' aoit Y bolo � >t;�:rr x �Izols 1 $35,000 $0 1 $35,000 $o $0 Project Manager: Project's Approval Date: $0 Public Works 3/11/2011 ORO I3333T3T 0T a , PROSECT�OTiALi, $35,000 $0 $0 $0 $0 $0 $35,000 PROD ECT'$TOTAL 50 50 50 $0 1 $0 $0 $o 1 $0 $35,000 I $35,000 CITY OF PEARLAND, TEXAS PROJECTrNAME-,...lAMOIMN,A,IfiyMiggOgr,104WAM19:04100iirefailra West Side Library Store Front P.R0j0c-rfPE5CkTPT;Olegl4MWOMilied1404AAMONPM0,001101&40t1 To provide funds for build -out andfinishing of a store front library on the west side of town. Approximately 5,000 to 6,000 square feet. 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM aadalEtTOROthaAW4OgilAIAMNWV: akaFtabutahmwaaTWagalelaWtrifOlt$KWOOKW FA1202 I a lrahagaflftliflHOWN00E01,10G*ANdiiim4oxatiANtatosTaM44$§4iMfilWAPAPAW*Ma; Expenditures Personnel Services Supplies Services & Charges FROJCIrIgSTIFICATION444fte44ROWW:g*JaatnMOIW4g* One of City council goal? in 2010 was to continue discussions with the County to identify library needs on the west side of town. with population of almost 100,000, the Tom Reid Library is not centrally FTE Staff Total located for the west side of town, nor meant to serve 100,000 population. An interim solution Council approved was a drop off location at westside Event Center. Store front is next step. VAIWWWWW0.00001 1144-1'3PluPffittliii tlitati0krinihiSil Preliminary Engineering Report and/Right of way oesign/surveying Construction Equipment and Furniture Contingency 2012 2013 50 2014 2015 2016 5145,000 5145,000 8145,006 $145,000 $145,000 $145,000 $145,000 $145,000 bmgimumplimoulownammoRnammowNgamoraimigoEygegoecT5ampwRgIAT,ToNsmmmommumigamagemmegammummaimml gicallifign Iraq" arstilili WOW 114 g " 'rertdp itpfet gyiwAkiRoKA TaiaSt igothRobSatt, iwita 4,444a14 iith4„ 2b15: Adit2_016il ' Lrkir,E ,qtafrAil So SO SO 5550,000 5550,000 $550,000 $0 50 5550,000 . $0 $550,000 80 50 50 50 5550,000 OTAL COSTS $0 $0 40.M.INVOTWINkh fl'ETuft.EmsciP,K5I1110::;i4;6114. !Min9iiiktitt General Revenue - Cash Certificates of Obligation Future GO Bonds w/s Revenue Bonds P.E.D.C. system Revenues - cash Impact Fees unfunded Other Funding Sources' - TOTAL SOURCES TgallOSeOglAWN4AglMgON0141041MM06461hriiiikalingigAtglik,e4O1S64O4AOSSMONaMai6OWittalpgrasgsgaM6gimisSiiigaglotiftgwofloggia4eimosaroppaalt ,NUTOOTWOONVIOWTORliwo krdrALUOIkataMttiNeakbgaRtfig $550,000 $550,000 1 Explain & identify Type of Other Sources: Store front location has not been identified yet. $0 50 14rhglailligralelliningeleingelarnatall111 50 $550,000 $550,000 50 SO SO $0 $0 $0 $0 50 $550,000 $0 50 50 $0 $550,000 Project Manager: TBD Project's Approval Date: 3/11/2011 44 CITY OF PEARLAND, TEXAS 011.60EGTiNAME4 0 ;d.��.i 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PaoaEci?;!it; Tom Reid Library Expansion P13:0g ECT{IDES GR>:PTIPN;IjijW$51,q?j!j �$�'i Mi . tdI c The library expansion will increase the now 20,584 sf building by 11,542 1Expenditures for an overall floor plan area of 32,126 sf. This expansion will create nen areas in the library such as a bookstore, children's story time room, teen Personnel Services zone, computer labs and additional office/storage space. Renovations an< Supplies enlargements of existing areas such as the circulation desk and book stacks are also included. iiluiP!!k}i!y$ ltiii;!{(}Liimol6i kTgFiiilifM, (maigl F20002 II P b ECf.I{i5USTTF,X EA Id Nu 4�,. g103'^ 6 t;1it ,1i- 4 1 A, O A 7 �� %I Ii,lid:,7Nedi:i{�H,trf�.� ,!j..,'1;lrattirii?:ilii!%:;i7ui'!I !�1!i�lidiii!ii�i#iii'liG The significant growth of Pearland has created a need fo children's area and adult meeting room to conduct area for books, and improved computer access. i„ R0ltEc39 cilf5'-S i. ia� lICA$ IONHi d}�p�aqw,Jw ,coysTS LL(IG4Yf�I��ON fl ! 1 A' ill yy Oi{:h�f l: NI>:'4{(� iiY{m!(p s;il„ 1 III: t.� �-!�1 . Ir.,� :nSk..G.P n:... Preliminary Engineering Report Land/Right of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS Slir;'yk"i': a,' }itr@?5:'PNYt I :a ,�t!ti.,,{id�Chll+Ii� �n{I''.e6!u,. G ElS IJ'ku'FUNDINGL;S URGES i!Y<S;rP,lq{tllI{P.1 dlPi!i!J!(j h . General Revenue - Cash Certificates of Obligation Future GO Bonds W/S Revenue Bonds Services & Charges a larger Total activities, more stack FTE Staff Total ii5 rREERENCE!!iORDERir ci 4621 ig21.4 iAiri e:i3iti!giii:.133i!:;;•g{glki.IIIfiiSi I 9 !'.1{lti0ROOOATINGTAND;7;.FJATOT;EN4NCE,$'COSTSjp=. ';al 71i!�#.M 2012 2013 2014 2015 $0 $0 tT.!"ipl:{64,ft!; }&i!i 1:Ad!IUfIPMl! IU '' i".8ii8##VNlfiilLm#!h!ikftfllsMkl4U,",V.'y":-{gf;liF , 48RO3 I,EPOITERORRTATi0N5''91I iii41l14PiilMLr sp(,' nt IxK ijl l! ARE!" . :.,,-.,.:w �o. tp;. titian" 6TTO ,tt �'7d1UD ,1111' kh'' ARPR0R' !+< iF!UNOED il. iTOTAU( UDGET' G1MKttsRPRO.1e4 } 1 [EDGES, mitu12 $35,260 $35,260 $35,260 $35,260 $230,400 $230,400 $3,145,000 $3,145,000 $288,000 5288,000 $3,698,660 $3,698,660 1"1!11101,1(t!v;N;i:;rythfil6dtti!1110 pk'i!Cllt%tiiaNFi�li f,rijG{t#'✓u,9i��yl't'�4it�',„if'1{i}::;, P iE13 i�zd+ i 1, , TA'L^.kBUDGETII � : OITA',!g'li1P,.PROP1i $35,260 $35,260 $3,663,400 $3,663,400 System Revenues - Cash Impact Fees Unfunded Other Funding Sources' - TOTAL SOURCES $3,698,660 1 Explain & Identify Type of other sources: $3,698,660 $35,260 $35,260 snwn0ffigi p "ITiRU�20S1!a $35,260 $35,260 $35,260 $35,260 45 2012i $0 III'9tix'• ! 1lk2014 50 1 $0 $230,400 $3,145,000 $288,000 $0 $3,663,400 ullrtkPktihlGAiiFfi;iii3pii !ti Fa7i�r'A"skil`!i $0 2016 $3,500 $22,000 $25,500 i10TAS;? fl'PkOg ECTI(TOIALi. $35,260 $0 $230,400 $3,145,000 $0 $288,000 $0 $3,698,660 $882,600 $2,780,800 $0 1 $0 $0 $882,600 $2,780,800 (,Project Manager: Cara Davis Project's Approval Dat< 3/11/2011 IOW& enItbS P.RO3ECTi.TOYAL€ $0 535,260 $3,663,400 $0 $0 $0 $0 $0 $0 $3,698,660 CITY OF PEARLAND, TEXAS P, RO1ECF NAME; I;�:'� �,jt:'II� 11' J1 Fire Station #2 P.;RO7E,6T;DESCTf1T;II rMU VIIMH 2012 — 2016 CAPITAL IMPROVEMENT PROGRAM PROJECT:" FA1601 ,..E , .., �..Q _.... .. _ PRE FERE,NCE!rOROE�RyId!�I"@1:=e;gk!wLadic. Construction of a new facility between 9,000 and 10,000 square feet. ThisdExpenditures facility will provide a fire crew for one pumper and EMS personnel for one ambulance in the future. The facility should be capable of housing twojpersonnel Services fire apparatus and an ambulance. The station will be located on Bailey Supplies Road in the vicinity of Harkey Road. ,NC)PERATINbRANIUMAfiNTENANCEk;COSTS;r t 2012 2013 2014 2015 pkOJ EC O USTIFICATIONsi'y [ This fire station is almost 40 years -old. Locating the facility in the Total area mentioned would help maintain response time and distances. There is no space for crews to stand-by for short-term when other stations are FTE staff Total responding to calls or for an extended period during a storm. It Services & charges PR07E! dI,iinCFION �;i 1 4 h.,a.a:: Prelim nary Engineering Land/R-qht of Way Design/Surveying Construction Equipment and Contingency TOTAL COSTS Furniture Ik11ii«f;i Report AORWASCO FUND,INGas{,pURCES is lift l fait MAAS General Revenue - Cash Certificates of obligation Future GO Bonds w/S Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees unfunded other Funding sources' - TOTAL SOURCES iLrFi`ui�! iI!!ti! rr y' 'L,. n, IOTAL,BUDGEt4 $52,100 $120,000 $260,000 $2,655,000 $75,000 $530,000 53,692,100 ?I:ki3mry4!Lilki'.Piaf ii!rf3 iiNiiftiit in!! t AA!EWA«%F AFI}}H4f!N�FUEDtl`'td IEITY APPROP��f.11I - BUEGDGEP>t{ig;i $52,100 5120,000 $260,000 $2,655,000 $75,000 $530,000 53,692,100 $01 $01 $o $0 sF $0 f! 5fi iCi14F'iiAP,RO],E ICIED{+p:P6ROPRI?A+TE03,57jy;!$'j;jt;�4w„y5;�N1$Ilt`«tbh¢°Siwi:n>a�?� t ESI# MATEDr 64041' i✓v! -r da .'e'enPAN!!:�yT. Lrx 1,u v,,l,161 �hESJT M2AEL!41`.N20124 ,1 '.Ol'3�, , ui^r.1di-4 � °rni O l 2 t?'IY!�i i m Ecti4OTIA q 2016 $0 $0 I $0 $0 $0 $0 $52,100 $120,000 $260,000 $432,100 $52,100 $120,000 $260,000 $0 $0 $0 $432,100 ilriil ithfi d.II1nui` ili yN fl3 ?jNCJI�= }TOTAL,BODGETt.CITYA/AP P ROP' $3,692,100 $3,692,100 I Explain & Identify Type of other Sources: In future bond referendum. Construction to carry over to 2017. i.} $3,692,100 FUNDEDIrly6dE, TIMA-(!IEgr THRiJ`'1L011! 5432,100 $3,692,100 $0 $0 I $0 $0 $0 1 $0 $432,100 46 IN ................_., ..,_....,,.a., I- r PRO] EC;T„EFOTALin $0 $0 $0 $0 $0 $0 $0 5432,100 $0 $432,100 Project Manager TBD Project's Approval Date: 3/11/2011 -.A ,r ��thaiPtlig / TR0811 Business Center Drive TR1201 CR 403 Hughes Rarich Road) TR1203 P*adaoVParkway Extension TR1202 Sidewalk Installation TR1301 Fite Road TR1302 Max Road TR0803 OIcl Town Area Sidewalks T00002 Bailey Road - Veterans to FM 1128 T88976 Mykawa Road Widening (BW8 to FM 518) TR1401 PER for Future Bond Referendum TR1405 McHard Road Extension (Mykawa Road to CuIIen Parkway) T20002 OId Alvin Rd Widening (PIum Street to McHard Road) TR1501 Regency Park Subdivision Paving TR1503 Longwood Street Reconstruction TR1504 Grand Boulevard Reconstruotion TOTAL CITY OF PEARLAND 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM STREETS b ��]�� ����m General Revenue - Cash CorhfioamaofObligation Future GO Bonds WIS Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees - Cash Unfunded Other Funding Sources Plus Bonds To Be Sold III Future Year TOTAL ENN� �����.� WI:it/3E3:11N i„ 175,000 40,000 393,000 160,000 302,718 1,623,400 230,098 40,000 40,000 200,000 $ 2.173/98 $ 1,230492 1,065,000 397,297 294,501 777,344 1,152,792 200,000 500,000 100,000 6,400,000 2,592,118 515,075 21,390,589 1,094,500 245,161 991,404 1 793,109 4,773,000 1 $ 34,966,382 553,000 280,000 1,623,400 100,000 245,161 9,911,250 302,718 230,098 912,372 I 23,469,603 1,230,492 1,240,368 175,000 40,000 $ 1,030,718 $ 2,173,498 $ 4,773,000 1 $ 34,966,382 Note: The totals do not tie by year as the City anticipates appropriating funds for GO Bond projects in one year and then selling the bonds in the next year. 47 ,�� 4,172,600 10,632,000 10,377,232 19,250,000 4,950,000 2,766,600 6,017,544 2,741,502 $ 60,907,478 ok -n� s,m� th " gt 1,445,492 5,630,600 1,783,400 1,224,614 817,344 1,192,792 500,000 17,032,000 12,969,350 500,000 41,155,664 6,044,500 3,011,761 7,008,948 3,534,611 $ 103.851'076 5,861,200 25,447,218 28,009,046 $ 59,317,464 300,000 1 n.810'19r 37,534,868 52,923,837 2,685,860 1,590,014 $ 103'851,076 CR 403 (Hughes Ranch) 2012, 2015, 2016 Business Ctr Dr 2012-2014 Fite Road 2013-2014 Max Road 2013-2014 Grand Boulevard Reconstruction 2015-2016 Bailey Rd/Veterans to FM 1128 2015-2016 Ca Longwood Street Reconstruction 2015-2016 Mykawa Rd Widening 2015-2016 McHard Road Extension 2014-2016 Old Town Area Sidewalks 2013-2015 Bailey RdlVeterans to FM 1128 2015-2016 )CR 403 (Hughes Ranch) 2012, 2015, 2016 .'Old Alvin Rd Widening 2015-2016 Business Center2012-2014 Old Town Area Sidewalks 2013-2015 Regency Park Subdivision Paving 2015-2016 Grand Boulevard Reconstruction 2015-2016 McHard Road Ext. 2014-2016 Sidewalk Installation 2012-2015 (nine locations city wide) This product is for informational purposes and may not have been prepared for or be suitable for legal, engineering, or surveying purposes. It does not represent an on -the -ground survey and represents only the approximate relative location of property boundaries. 2 ■ Miles THIS PAGE INTENTIONALLY LEFT BLANK 48 CITY OF PEARLAND, TEXAS PROD EttINAMEI' � :'Alit.'S;I?„!„Q. R:Cit:il:lil li I?: Business Center Drive PR07 EC MI DESCRIP,TION'yl;18)Mglly,ry:j x$;11 Two lanes of Business Center Drive already exist from lett include the remaining two lanes from Broadway to the southern entry of the four lanes from the southern Pearland entrance to the section is concrete curb and gutter with sidewalks include improvements to CR59 that will accommodate the 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PRODECtS TR0811 P.REF,ERENCOORUE2':Yt4k!ofiNM'+i{SI61 N,44r4i4 !044?44.41:;r u4_ 1 ,LY I%IVpu•:' i8 ••.+4: �.. ....�..... q¢, 3Juis m',.y,+,,...,..:.yard ,. Yr.., 1, �Nk":t'=,�4"'m', ,1.,. :ya,1l ,,, L, ., ,.,r, m=tOPERATINGI'ANDtdMAINTENA'NCEiCO5,.5;L9i`Lb,l''u��;U':r!ii".;!•t;t;.�iGi. - Lr�nd,.f.... aR.G.; (i.Yl{., ,..a: n a„i��„,: a! r:,,1:,,..Utln...a .ult�,.a >.CrX�f...nSi{ti":_ .. � T :x..,14, �.. Broadway to to the southe rnl Expenditures 1 2012 2013 2014 2015 2016 1 1 $3,200 $3,200 $3,200 Pearland Town center entrance. The limits of this pro RROI CTsjiiSTIYCATIosiut!igiiil Pearland Town Center andlPersonnel Services CR59. The proposed cross1Suppli es The project will also increase in traffic. Services & Charges L'li;;in:jpY � "r. rvsa6mljij;=. f_ This project will provide a secondary thoroughfare to alleviate traffic near the Pearland Town Center. ',., „ST 11OCI0NI I 151, !AWN Prelim nary Engineering Report Land/Right of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS Pi FUNDINGutSOURCE,SI '411pail ri87 hii dj General Revenue - Cash Certificates of Obligation Future GO Bonds w/S Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees Unfunded Other Funding Sources' TOTAL SOURCES Ad{dtl ix I'ii?uSSI i 4O;yf'diilii9!i?NhERSOitkljlitr! ju 41b . 41 NI'I'X�r!J'tNDTP"r Ig oTntgll?lrlm�l?E33k8 j.C1lat , PPRO.P t!fIOTALY�60DGETIiL VLSTY:�PP,RO P,.1., $326,927 $166.927 $457,045 $377,045 $6,227,460 $1,385,492 Capital Outlay Total FTE Staff Total 50 ?.;;:i`E14,F,y;1ORosocfEPOSPPROPRI/Si !F,UN66.1' a"'yrES - M7 1 . rYI;{nnjy�irHiBi ''i,(T'�'!!'iP:t'rin 4; �ad6GE7t ;tt"+?� rv; 1.+iWkOkOrllirli!ii{ {2071 �I?! Ifl ¶":41%2013t'7{t""` 5126,927 $126,927 $40,000 $357,045 $357,045 $175,000 $3,200 $20,000 $1,210,492 $7,011,432 $1,929,464 $483,972 1 $483,972 $175,000 $40,000 $1,230,492 : � I , J l�ut6xriP,b! {''- TOTA!3I8ir ti» r tCITh1lh.R OO: TOTALI:iBWDGET„ hCITKI!`AP,P.,ROP: $126,927 $126,927 $6,884,505 $1,802,537 $7,011,432 $1,929,464 1 Explain & Identify Type of Other Sources: Developer funded via agreement ($357,045) approved on 5/23/2011. HGAC TIP in the amount of $5,081,968 in 2013 & 2014. City match to ($1,270,492). $126,927 $357,045 $483,972 ESI IMA p 4T14614411` $126,927 014 wa $3,200 $3,200 0! k ! $3,200 $3,200 AMU t,;,v.; ... :7 .i ar.4 4 r=+? . IN r eBRO],ECTA�rTOTAL*� $166,927 $0 $377,045 $1,385,492 $0 $0 $0 $0 $1,929,464 $357,045 $175,000 $40,000 $1,230,492 $483,972 $175,000 $40,000 $1,230,492 be provided by a future development agreement 49 $D I $ Mff" LEi PROJECT4XOl'Aftx $0 $0 $0 $0 $126,927 $0 $0 $0 51,802,537 $0 $1,929,464 Project Manager: Cara Davis Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS INOjEgVINA4Ek$U$01$4'MWNeKebiAftigliAllYgh0a111010 CR 403 (Hughes Ranch Road) 2012 — 2016 CAPITAL IMPROVEMENT PROGRAM 4&0000004WA011 OAdJEct*OaLimghteligaaffiT OittEliENtod 'ElimNimWOPPSIWOWSNAV*034 TR1201 2 i?.110$00,0eSSRIOTIONNOMPONNIMMIPANNOMMgifill1WOMOMMUlieleiga,g444$WANN$114thefialMOKRATINOW4MOSMAINIENAkEEW4T$1101AWaillOWitHiliraWAIV Reconstruction of cR403 from Cullen to Smith Ranch Road ri-om a two lani -.Expenditures 2012 2013 2014 2015 2016 asphalt open ditch roadway to a four lane concrete curb and guLLg. - boulevard for a distance of 2 miles. Brazoria County will be completing personnel Services the design, environmental clearance, and relocating the utilities. The , i project includes approximately 13,000 LF of Noise Barrier. The City isupplies responsible for acquiring the ROW per the interlocal agreement with Services & Charges installation and reconstructing the intersection of CR 403 and CR 94. $2,160 in 2012 will be used for signal $2,160 $2,160 $2,160 Brazoria County. Funds available Capital Outlay OkitutetftstiitAtitiWANNWIAAEOAKOOMMOBEMORHMOVVROMM45611 Tfie roadiyay will provide enhanced safety and access to Dawson High School located on Cullen Blvd. and enhance access to SH 288, in conformance withTotal the City thoroughfare plan. FTE staff Total 01i10141104,040.44,11INfril,11 Ritimigild.1.04400111461IFINM11101.1141hAtills' ID inktitiith• iitt}444,1 I 1„ 11 1 I t4gr11IW(1R.1aIlMoi TIPCI 11,11 1 111 01N.h 1ti? 14 r L -11414{ trio ,npRo3gergitio, 015,t1 Ptel • ,,.;,2•71-0TAM. ; $0 $2,160 $2,160 $2,160 $2,160 Preliminary Engineering Report $0 Land/Right of way $1,065,000 $1 065,000 $1,065,000 Design/Surveying $500,000 $500,000 $116,000 Construction $19,256,000 $19,256,000 $4,114,600 Equipment and Furniture $0 Contingency $1,500,000 $1 500,000 $335,000 TOTAL COSTS $0 55,630,600 51,065,000 OpVg nAP5R0604104 (,FuOtt4Gp0oRctsih, , 40111NWAMEN1Athh A h. General Revenue - Cash Certificates of Obligation Future GO Bonds W/S Revenue Bonds System Revenues Cash Impact Fees unfunded Other Funding Sources' - TOTAL SOURCES $22,321,000 522,321,000 $22 321,000 $16,000 $342,000 $35,000 $0 5393,000 SO SO 1 51,065,000 1 $4,172,600 $100,000 $3,772,600 $300,000 WW$H4P1$4:PABT$4iim$Umlilfl$qiamOpiligilka-iiMBPBTANU$HlWhOlia$M1140,41gPftligWilDWIBM4HHhaWS,WHOBWHVIBTAWtM$HWIHHHHI$041/$B=IHMS4h NOM VIM! Qinilfigniiik6aWitiolawixe rttiaptuud.wrapvi, won tiallota qbgfbusiiukiiti41 hi6v661lAiiikopoitatfigok. .4A12611Wiritg raizatar; SAWA thltArthilsVa $0 $3,094,600 $3 094,600 $3,094,600 $3,094,600 $2,536,000 $2,536,000 $393,000 51,065,000 $1,078,000 $2,536,000 $0 $0 1 $0 $0 $16,690,400 $16,690,400 1 1 $0 $0 $22,321,000 $0 1 SO 5393,000 $0 SO $1,065,000 $4,172,600 1 55,630,600 Explain & Identify Type of other Sources: City or County future bond referendum. Project to carryover to 2017 50 Project manager: Brazoria County Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS PRO] ECT'. NAME4.4 11^II 1!"•Y;C ll';':';;IJ r,�:F16i.jf Pearland Parkway Extension T O7ECTliDESCRYP,,0.1.00 i!j4j,tli7lti+�'i SE!p A new extension of approximately 4,500 ft. from 500' east of oiler Dixie Farm Road, constructing a 4 -lane, concrete, curb and gutter roadway with raised medians and a bridge crossing at Cowart's sound study will be conducted in 2014, construction budget will be if noise barriers are warranted. 53 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PRo7EtT*10:wziur5p.^"abpMUa P�FBEOEwObE�irf{ TR1203 3 =W: & 301ilii {`917aGi!;^'k;k!j:;. ji';ii leF2I'a!;t!1.50*ERATING0400: F INTELJARC-E,;IGOSTSW"10000500+',I31 Drive to divide;: Expenditures 2012 2013 2014 Creek. AiPersonnel Services adjusted Supplies Services & Charges Capital Outlay P,ROJ600010$TIFiCATI614.'Ii'!I'!11iIr''14;;, fil:Ipji",0g11i1!iu!3Altl'I dC!!I:;il'0 !!iMi!.'YH0 Ilifj'.; 055ti!:':IiJii;4ai0H IiM0 Connection or a minor thoroughfare to a major thoroughfare in accordance Total with the Thoroughfare Plan, which will provide for traffic congestion relief to and from the Beltway. Eventually, Pearland Parkway will connect FTE Staff Total to Britney Bay Boulvard in Friendswood providing an alternate route to IH - 45. II rPR' k ECT;tGO5TS';'A6000Pp. I'1,11 lith 1(.�I'' ::.tlti I' tl: �:eh!P�i:. i. knii..!y:aY.iFt'!j:q::� Preliminary Engineering Repo Land/Right of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS q "8 r? 41ix'I:tii'ggir: FUND�NGj';jSODRCES'. % I ,jl�lj,�,�1,'rtl ({ plllli!i! IIS IP1.1 General Revenue - Cash Certificates of Obligation Future GO Bonds w/S Revenue Bonds P.E.D.C. system Revenues - cash Impact Fees Unfunded other Funding Sources' - TOTAL SOURCES ;cRE@,;$ tifniari4,11k i+isH!ilH;:!fG:'iSl!iwa!tiros";gi!4µi [I":a;it gffil1+'Mx,u,>iklommi ...... Ill; "l:'iTiifl11 i iy F,D„E„Ty! IiMrotiAAriGEUM ilig-YyMA140,i'i yBUDGT;i fTHR.,. ..ty.,.,Oifi.,.l $200,000 $500,000 $600,000 $7,617,000 $40,000 $100,000 $120,000 $1,523,400 $8,917,000 $1,783,400 $0 SO G% etijhIi4ti!I;tJPF,;ibhtialiiitlruliinms :It'fiY::,W.sd!: ;i ti l;ti!k>'Y !ky[nnhUd F�li vhl' DGEiT4' TOTA'Lh; BUDGa.4 t ::F.UNDED,�ESTIMATED. IT q.dkPPR0Ph''5 !...i.DGETEE:-. CIT,Y.I�IA'P,PROP1 lil; hBUDGET;': '�'I'naU:+20Y1I` $1,783,400 $1,783,400 $7,133,600 1 $8,917,000 I $1,783,400 50 1 Explain & Identify Type of Other Sources: Fund 68 Fund Balance. update numbers for sound studies in future. HGAC TIP Funds in the amount of $7,133,600 for 2013 & 2014, 20% City match required 51 50 $0 50 ii-FAR0004.00110 (A0%ECTugAgERopstsATIolopshTSt'a 7.�:?1241� ry ' k".L�j!'I Refs 03' �. 1 $40,000 $120,000 $100,000 $1,523,400 $1,623,400 ?Ne i'Sl!Ilft ii N 1201540 SO 50 2015 $20,000 $3,500 $23,500 0.5 MAW Ntlith.:;1 2016 $20,800 $3,500 $24,300 0.5 :im«pili'8 Y01551:;1§:'l+ n92.016+.'H,r»•8 m:PR07, G1;TAL,: $40,000 $100,000 $120,000 $1,523,400 $0 $0 $0 $0 $1,783,400 01 O1 $160,000 $1,623,400 $160,000 $1,623,400 SNiNlp$!g!; 1, 5 ' u i. . 5! tl +n .. � .a'u. C PRO] qq��TOTA .G@k _ I�. is $0 $0 $1,783,400 SO $0 $0 $0 SO SO $1,783,400 I $0 $0 50 1 Project Manager: Andrea Brinkley Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS pROJECT:::NAME; ii'n 16!":ijs;p' Sidewalk Installation PAOJECTEDES,CRIPT;.IO8 0i (:"riii:G'�i::�� r.ilr:iil tio! F" QkA'!i4SUri!1l:4 iiiY!i>n!Ri;H%;`kr14:,401 :RFz!il:Eni u�'iI;?r:51i tIa AAIltiil:A!( 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PROJ ECid# r . � ,•„... ,M ... .•. � ,�: h„{ PREF.ERENCE,ORDER�. +Ite+en s e mt:�Pr_§r"'Nm".n . e• , .,.i!,A�t iR .. v .1eAih ,I , 4 ...v. xh, 1 vW 'ix•., ,e.,.uA _____________ __ _____'3__L___-_-. TR1202 4 t;.,-.id'i!P Install sidewalks near expected heavy -use areas such as schools, parks and Expenditures businesses where future CDBG funds are not available. We have identificj nine locations that we believe would provide benefit to the city, for apersonnel Services total of 40,410 if of 4 -ft -wide sidewalk. This project would bel accomplished over several years. Some areas may also require drainage work(Supplies to provide area for the sidewalk. Budget assumes $4.50/sf installation. Services & Charges Capital Outlay 0.1261ECT JUSTIFICAT•ION}`lli hl Facilitate the public access to schools, parks & businesses safely and Total encouraging reduced driving. FTE Staff Total i. ihi41! glit i 1i�. �'R? ratilt IflViPA03 ECf COSTsj •ALLC�TION P:riklll!;1,�1?.jl,t"4�1:f"1,':ii!:'viiMOrtf Preliminary Engineering Report Land/Right of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS 44it;1lttyirt0iiiZ FUNDING. qui RCES;h .naiall i�, y m=. ;40PERATING"• AND;:;MAINTENANCE EOSTSUyj? 2012 2013 2014 SO $01 '1 :rn : ".' ""' Wd8a.Lt n7L1.!$'H IPMitgal.tl`r!$: ECT k' R:IAa thtlh"^.:: .I,a. 1414:Iby:hrrW,udY'�'i6`id"+' u' l ; 1 rN 1_FYJ11PR00 ED A'PPROB �- ;'h�,��ttig fOTAtABUDIGE1;, ,1[ CUM A1 P RR0u' P!Ii 1 FUNOEOt`i:'iiiESTIINITED�`u'4m i'F" l i`F g `t"'�' if !j: to 'prat �! .4, r, „ih� ic-'5h.., i.. 'fr, "mg 1i I r t ,r : "���,.. . , 2013 ...,f ,`...- GBUDGETu3n. utHRU;,12011t'{, �. „. 2012. �1'f� i, , ti201�'�Y 01. 50 $63,015 863,015 115,577 311,840 520,444 515,154 51,050,270 $1,050,270 1259,621 5197,340 5340,735 5252,574 5111,329 1111,329 527,520 $20,918 536,118 526,773 51,224,614 51,224,614 $0 50 $302,718 $230,098 $397,297 $294,501 I! Iilrr''x;a!LH4sM.:'tiW7111,11 4 i T0'rAthSBUDGErraJ tiN:S'tfl' laP IBIS General Revenue - Cash Cert'ficates of Obligation Future GO Bonds W/S Revenue Bonds System Revenues - Cash Impact Fees unfunded 51,224,614 (Other Funding Sources' - 'TOTAL SOURCES $1,224,614 Explain & Identify Type of Other Sources: Safe route to schools grant currently not funded. If Yrl-Business Center Dr., Miller Ranch Rd., Southdown Yr2-O'Day Rd. Yr3-Hatfield Rd. Yr4-Hughes Ranch Rd Yr5-Hughes Ranch Rd., Old Alvin Rd. $1,224,614 2015 2016 50 5302,718 $230,098 $397,297 1294,501 51,224,614 $0 $0 $302,718 not funded by grant, could not proceed. DR. & Lambert Dr. 52 $230,098 $397,297 5294,501 Project Manager: TBD L $0 SO $0 SO $0 $0 $0 $1,224,614 $0 $0 51,224,614 Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS PROD ECT4IAME'. Fife Road PRO7EgThoESCRIPTION:,"Atjlg }4'p,''IOit'ih t. !i'ai;(nei!tiiN&iPii{ ire nj An extension of Fite Road approximately 2,500 feet east of McLean, adjacent to centennial Park, tying into Veterans Drive. The project four lanes, undivided, of concrete curb and gutter including storm outfalls and detention, traffic signals and related items. 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM �4'k'"".'>u" i1th :}11i s;1i';?:;jE@Iliil$i's nl .i%Ui:i� runninglExpenditures includes sewers,Ipersonnel Services 1Supplies (Services & Charges Capital Outlay P,RO7 ECT"t]UST;ZFICATZON' -v'"f •'1'P""i ;!n„,ypt,ry' �:� I:i1nm'in divertedto wi'T1 reduce tTie-"Tarpge, amount of traffic that is p currentTy �• i'fe .lilrx .m .114,.:1. : i_ _:A.n.r+m•.i•:kl!1K9 to Walnut Street, which is primarily residential. The completion oTotal this segment will allow traffic to continue on Fite beyond its currentlFfE Staff Total termination point, which will improve transportation efficiency and safety. The roadway is heavily used as an alternative route to FM 518 and serves residential, commercial, and school traffic. '(:+;•' 1eapj�.v,::C0ST r�A .lit F.PR,O`J ECdPt�COSTS A I t.. _,! IR'!40 Preliminary Engineering Report Land/Right of way Design/surveying Construction Equipment and Furniture Contingency TOTAL COSTS Milt 11 ,:.•�..0 ....nN:,i1.µ ..:&G r....v............. FUNDIV *),!-RCE$ n General Revenue - Cash Certificates of obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues - cash Impact Fees unfunded S!iillgildliiFi!iidiiigi!iirh!;11I!I'3gAl Ii e;20!RIIIIYO TT O4A.11iUDGETaIR Ii$I: gthH := CITY P,PROP. 1 $200,000 $40,000 $600,000 $120,000 $3,286,720 $4,086,720 $657,344 $817,344 utteH4;`;li'.if midg iliddi!!s:i'4+lii:l ij lidlfmmtlPj::;!gt lYs'ii1 ! ".4.tlfPY,- u.,,ll', 4 �..F, GE.,Ia al. iii, h r ,rum.. kTOTAL{I�iiUDGETI!4 N:�i.CITYVAPPROP':�11�' $817,344 other Funding sources' $3,269,376 TOTAL SOURCES $4,086,720 Explain & Identify Type of other Sources: HGAC TIP Funds in the amount of $3,269,376 in 2013 & 2014. $817,344 $817,344 PONDED ttsuciUtlt PREFERENCE*QRDERgthd+4R!i!?nT$'il 5 —__—_— :gORO A72NGRI4NWimhIN,TENA'NGE;1,gosTS,! ;' Ik'MHiia2SNS! il!$'.i4^' IAhill 2012 50 2013 2014 2015 !`N^'@iW°iImxit;PRg7,ELTE0i1jeROP.RIA'TYONS; :ESTIMAEU id; G i=I{tu!la:l,l tl wkl. '4h , itN,it; t '�l�tig, �TIIRIIU'2D11 Itk?2 c4�i .,4i'11p2013 $40,000 50 1 SO 50 540,000 e4N41titt:1 %uylur 44.4.1. A5i eAtitt !ve 84.14 �}•.,)�+.u:. �. r: I N .I ,i p 1, 4 .. UND .r rES: � �� "�xT�ED :.6- � ff l 4 t F..., ED - .., tZ01 .i : +l'ciFtr'.L�y�!r�!!I';x.mt':! :iil. TS rBUbGET�'t� a7HR "�20I1: E��2012i.!� T+,nla!P2013;i�t $0 sol 50 2016 50 jryry'*}!8{k, n»l,}i`;.q >” 1{:Y"lisi!!isSma:}!!».•:�+i,`?. l:; Aiti!i8if iir 0145s�.+. 1°Hi':20151'x:'r}C:TZ016.!t,.x' "w�R ECFi'i u ALINT�.[ $40,000 $0 $120,000 $120,000 $657,344 $657,344 $0 $0 5777,344 50 1 50 5817,344 hl� unit- '!F3:Iola $40,000 $777,344 $0 1 $0 $0 540,000 1 $777,344 50 1 20% City match required 53 PAOJECtpa JAL^lit $0 $817,344 $0 $0 $0 $0 $0 $0 $0 $0 5817,344 Project Manager: Andrea Brinkley Project's Approval Date: 8/9/2011 CITY OF PEARLAND, TEXAS stojEcm*AgEnAnniOngftnnninnnn4 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM 4 14051-IiiiitiffAiliggiVfrliinglii-iMaiNii OROri Ettominenlangnalonnia Max Road imittlithtklokikkNOgurisnftln4 konalooft TR1302 PRRIEcTfPgsqqMptininnilitidnehialMaglipaaNAMOTA01414WnetlitliOnRie leig@nainAWANIOOMPPPEWINOANDMAINTENANcEi;itesTsWONOW'NAPONIAM4 1 2012 2013 2014 1 2015 2016 widen Max Road from -elle future Hughes Ranch al gnment and connecting with Relo-Expenditures Boulevard, just west of Food Town. The roadway will be four lanes, divided, with concrete curb and gutter, including storm sewers, outfalls and detention, Personnel services traffic signals and related items. supplies Services & Charges 1 $3,500 Capital Outlay 1 pitintern:jOsTtEitMAokeeNnagiW An;g48NWONWA0066Milea$04AWaralta:* Th7-7177 -- -c177ET51719 a sports Complex adjacent to the proposed project, Total increasing the demand for reliable access to the area. Improvements to this roadway will reduce maintenance, improve mobility, and increase public safety. FTE Staff Total 50 50 $0 $0 $3,500 Inammonimplaminokturnonmonmeftownm[vmmlainmstpww4AumngagmamtwE414413.mAlinopmrATIoNsoftianmipuwesomphomozinsningoAmi [ nomitn.ccisTsnALtota-rohin topnigpinvy [a "Immorizollinnimititta [ Ware nitMW n4t Itagfielfll [110449,1§PORIMISOMO[141 [41MisididWil[ti Migre&Mplokii4 ilitiadeeera teittaktii afispilf Sterritranlia4 Preliminary Engineering Report $200,000 $40,000 $40,000 $40 000 Land/Right of way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS $500,000 $100,000 $500,000 $100,000 $4,462,455 $892,491 $301,503 $5,963,958 $60,301 $1,192,792 SO $0 $0 540,000 $100,000 $100 000 $100,000 $100 000 $892,491 $892,491 $0 $60,301 1 $60,301 51,152,792 SO $0 1 51,192,792 NomogArommw ,tigliipnwtnsill,wiongwAgogonliwtwongw6g044nannoovrwmmniaanottinionon,amatgniminobvnliesinirgnkficanugu.noasimiNiowftnn ila, iTT[vn,„LgogimnippyRcE4 . ,, 11 mlniniggpiiiiiihnopinlfflogi ofgdwges itigf *gig]] tow itimmil Jinni - ' 1 4151777717 rim ' Irv' Ii14 '11.(1WAI21111T0011007014TAigidOgIldigilgilbti§q414W014441111466664046idin2oSO4LIWATLIMOitlIA: ,A2&5144011WARAegitail General Revenue - Cash $0 Certificates of Obligation $1,192,791 $1,192,791 $40,000 $1,152,792 $1,192,792 Future GO Bonds $0 w/s Revenue Bonds $0 P.E.D.C. $0 System Revenues - cash $0 Impact Fees $0 unfunded $0 Other Funding Sources' - $4,771,167 1 $0 TOTAL SOURCES 55,963,958 $1,192,791 1 $0 $0 SO 540,000 51,152,792 $0 50 $1,192,792 Explain & Identify Type of Other Sources: FIGAC TIP Funds in the amount of $4,771,167 in 2013 & 2014. 20% city match required 54 Project manager: Andrea Brinkley Project's Approval Date: 8/9/2011 CITY OF PEARLAND, TEXAS PRO]tcSAMEyiilS,y;Gj+r;g?I'th P;iiI4 j ltlFiilj4 ol-d Town Area sidewalks 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM 1:f'!1l�.i`{fi"' PRO :➢„,,,a:a.,rer" 't.1e '1'p"';.'4"I': 7ECT;, AESC PTIONI 4 .L B 1!ehs', dl �. ,.`."ry .I... _... .Th d. do t a. I 7..,j_..1!,Oii;t...,ad,.N„!t!lard Townaea Enclose ditcFies an pr insta"fi sidewalks �n the ad area St. and Grand Ave., from Fm 518 to Orange St. TR0803 3 BBBF,.ERENCE;.ORDEk'$+i"a,4{'!_r NiN1 7 4i nti''':1.;"':I':'.... ,,, %:i!i(liriiill411.11PM;hlORER'p.TINGx,;AND-,MAIR,TgNANEEAcps,TS„['!u'*V etween Houston Expenditures Personnel Services Supplies Services & Charges Capital Outlay PR07ECtN7,U5tIF,ICATSOM*p;ii[FI:„';j�'EPi!'i%h�Ccs. STdeWdl'res are part of and constructed in coordination with the Odd Towns -I. -Fe Total Master Plan. In order to install sidewalks without acquiring additional right of way, the roadside ditches must be enclosed. There are currently FTE Staff Total no sidewalks in the Old Town area; the work described here includes work we expect to complete within the next five years. With the Old Town Drainage Project in the northeast quadrant complete, Public Works anticipates $200,000 being spent in fical year.2011. AVIA Athi0 l { 7EGTi COSTNfIA�LS_OCATION�'�L' ;4511y41 '; Ili:rll:yyl6ry,NnllrLmd "4;ida.i^'11($, d1,1:.31LNhunrfr'�;�5"e :�i.l ��il lint Preliminary Engineering Report Land/Right of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS j: ri rA!;iili 117:t1:'Vti1iDiNCui;,�'$110gE E 11'1h ;FUNDINGgIS�OURCa t 4' If e. �y Ir' -I. x •r:4 1 ` t' if,t h a 'N 11 � 11 , l : ,rr.�' r, , I : t i !. j 1!P ,{ hf , ( i. Iv 1 1� . ,il'11. r1 h.l. ,�1h1c.1�4. 7"'71Pd I;i':'i?iilil!i!ililBriNri§45uG!ti olil1!{P7"45thti General Revenue - Cash certificates of Obligation Future GO Bonds MIS Revenue Bonds P.E.D.C. System Revenues - cash Impact Fees unfunded "y.�R1Ub`GGEEPNI''i 1lIT:dle‘ P: PAOP'1r: $1,000,000 $1,000,000 $1,000,000 $1,000,000 � III ftr� 1 'LJ 1 - Gr"'1r..t.Po h l �j7'r'{M }1„� {e�t 1J(a; t!;1 0 yf'yj(M4 tT111 4: ,Fj a1Y4AR 11'N TOTAL IBUDGET,u C1TY:HAP.PROP„. $500,000 $500,000 $200,000 $200,000 other Funding Sources' $300,000 'TOTAL SOURCES 51,000,000 Explain & Identify Type of Other Sources: Funding from Fund Balance. $300,000 $1,000,000 1 OVA <�UDGET ,,, $500,000 1 $500,000 $500,000 1 $500,000 2012 2013 2014 50 (IkF,:WAS{ili;i,;.ppi';LFYiiPR03ECT.EDOASTRORRSATTON51jt'e4';. ESSIMATED,?.:hH4 a�,�,','k TNRu,`?201111 ,1;t 1a 20112 ! :,nti ; 2013 i�?j{. 50 FIS$1h!hl $200,000 $200,000 �I(FUNDEDII''{I '7 5t'ES�TI,Ulrl2MATED�'I 'RbbGET4 ,igTHRo1]4 $200,000 $200,000 1 $300,000 I $300,000 $500,000 1 $500,000 55 2013 9�I ll 50 2015 50 50 $200,000 $100,000 4200,000 $100,000 $200,000 ! w20M 775011:1 $200,000 $100,000 50 $200,000 $200,000 $100,000 Project manager: 1'201 'ia^., v 2016 50 WitOt.Pr,' RA7ECET.HIWAITOTA $0 $0 $0 $1,000,000 $0 $0 $0 $1,000,000 016,: 50 YFRU]ECTIITOTAIL; $500,000 $200,000 $0 $0 $0 $0 $0 $0 $300,000 $1,000,000 Public works Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PROJE6Ei6AME5 9E1b551iNcbleribM.FM10b(leoM5MeES.Mwii,i5erWheie'ei'rbifRitoiEts4AlLSNMSIMeirOabiBWO'Weel OREEffattittlaotklitWillaNalaqk*Renlegi10#46. Bailey Road - Veterans to FM 1128 --108002 PROJECTilD&SGRIpTpOSMWIlegeM&AHMkANASNAWMYSMOMMOOMSDOWM6MMMOjIMAESS4MMMOSSISM*MAMMSMDMMMMOREOTBM6MA601104WtENANOEMCOSTWAMOMBUteeeMeMga&g%MMMOMMA Bailey /JOidwill be improved to a four -lane concrete curb and gutter boulevard penditures 2012 2013 I 2014 2015 2016 from approximately 1,000 feet west of FM 1128 to veterans Drive, a distance ofEx 2.76 miles. The drainage improvements will accommodate the roadway after the'Rersonnel Services Cowart Creek Diversion project and the roadside ditch regrades to the south have been completed. The project includes the full build out of the Bailey Supplies Intersections. A study was undertaken to optimize the drainage costs between the Services & charges Cowart Creek Diversion and the Bailey Road project. The result was to upsize the box culverts in the Bailey project for $1.4M, which reduces the cost of the Cowart Creek Project by approximately 52.6M. This amount of funds will be transferrer from the Drainage project. capital outlay kitdEer:130s1-4FfartOOMZWIVRONelMigM11061104001WAMMITOeMiNel4gOalAkt 'Four lane boulevard segment will accommodate schoOrtRilfre and provide drafnage. al improvements that will provide re -graded ditches that will drain to the south andTot --- away from Bailey Road. FTE Staff Total 491PF!?,C53fe-Pacis-4-95A-?,411V0.-i] ,AMIleaitITMOOMOWWWW Preliminary Engineering Report Land/Right of way esign/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS ill'iDN'AMMWMMOM5001W1540 1lej4iilWbeS0je.MMMOSMINSE's liseeM.E55MEiliMl&elleleMartiMIDEFOrarrellSeMS: General Revenue - Cash certificates of Obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues - Cash mpact Fees unfunded Other Funding Sourcesl - OP4'.fhirsibiiskWhMAFeell 'isholittSrith SO 50 50 50 50 nliwiimA4,:arawilmwirnilftioNmiTaalisamilagemAimtlEgplEGTEplwcAppgriATpilltoglgialigtfluithmilmitegolptiotimilift4ramkoiR MAMte lipitalliaM citiontninrstoixifid,k6 paptiniteippg rippen pr - :9Epiri: " y ;i:trix,44 qv 11,1,-,TAbEsubtiimii iga,,,A*Rovihy,1 4.1EtowitthiiB066E-ra: I:Radii:MU alkoigiTt.tw, OSP. : ,..201?4, !li filrindAtel natant, t rokebEct,to-riktiiii SO 52,429,005 52,429,005 52,429,005 $2,429,005 52,429,005 52,014,725 $2,014,725 1 52,014,725 51,914,725 $100,000 52,014,725 523,610,658 523,610,658 5946,6531 $946,658 $6,300,000 1510.632.000 517,878,658 SO 5136,423 5186,423 so 528,240,811 $28,240,811 55,390,388 55,290,388 so so 50 $6,400,000 510,632,000 522,322,388 Mlimbie55BEMMISM55405iMMMem155PHMOMiarflMOYBWorMreMeeartmAcimMENESMMAM.SreeSaMEEWOMPSSMEMMWSiMemMeeN546Wee04abimECCPMPMIMSO W.Irta,i.111p4;n1,46.ittirsOoKAIE1,*mriiiAl2nE jaIlffighirlitina Vg41104 "META PAWK ahErOTALDBUDOETIE5ACITY,NOPROM4 3;FONbtuDbodctils:IK:n20114S.AZI:F20.20.13kIlh420ivsilignot.20Isabilln-201bitlammEenWinOTAbwilw SO $0 526,401,082 526,401,082 $4,791,027 54,791,027 55,159,632 510,632,000 520,582,659 50 $0 50 50 so 51,339,729 51,839,729 5599,361 5499,361 1 51,240,368 $1,739,729 50 $6,400,000 510,632,000 522,322,388 TOTAL SOURCES 528,240,811 528,240,811 55,390,388 $5,290,388 80 SO 1 Explain & Identify Type of other Sources: 51.4M of GO Drainage Rinds from the Cowart Creek Diversion project ill be used to upsize the box culvert in this project. This will result in decreasing the cost of the Cowart Cree Project Manager: roject by approximatly $2.6M. Project to carryover to 2017. 56 Cara Davis Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS PROTE'iii E9ili!Y4lid;lpd l: {Ih.Krliyi"npd. C7.NAME.::t,1.. ,'i..._,,.J.4. . .,,:..h1..,1•..i, .,.n. Mykawa Road Widening (BW8 to FM 518) :I!;Ai!I�lif 2012 — 2016 CAPITAL IMPROVEMENT PROGRAM I'?iF itif!yi 6.141 iifU:'?I'ti1';S1u116If;+:l',L?=.ryi PRO]ECT,#:iYl i MIA A:PREF,ERENCEIh,ORDEWA T68976 ;MV •i. ,,: :, :nn; ':r,::a q:::l,•ml,'RO ia: :.11,.,., ,•i .:,n. ,:u ..,ar.,;i,:..r :. :,�, ,;; :, ww,,.;.F;:.,;,,; Iffia;' PRO7ECP',OESCRIPFIO �`iG IP>I I. .u4 h ..1 i'1 t.a.. .,, i. „1.. ,..v:. ,; I:':'ii.. l.h.. :,. .. IM -._ ,....,. _,NLS kl, i,lAi,.>•.Oalh",;,Ie�:.,1,9:H,:,(fill...,NA'tY:..,Ixlllil@E,mlhhl_�i:619thih,,s;m!h,,.}�raf11�_..wL..r.,4Au,�::, :.:u•,..:ud,..,.:, r..t._...;...1 Construct approximately 3 miles of 4 -lane concrete curb and gutter divide Expenditures boulevard section roadway, including storm sewers, outfalls and detention, traffic signals and related items. A detailed Drainage Study, Environmental Personnel Services Assessment, and 95% Construction Plans were created for the segment between BWo Supplies and McHard Rd from a previous design effort. Services & Charges Capital Outlay ...\ eR0)ECT_i7U57IFICATIONNA4xMa"`:I1:{_l'tM(f;{�ir'.;h'i4i°Ij;;3%'11rii'.^'d','4''?.iii?W°;ItsWi!!ilrtiiWP({;i1111:i1! rl;l{'.ik0'S1<AS, This proposed roadway is included in the City's long-term thoroughtare plan tolTotal alleviate traffic headed south from the Beltway 8 to FM 518. 1FTE Staff Total cy;; r :;r,rlh'::,'i,nr:. E: r 'PRO7ECp .COSTS AL OCATION i7FF. 4 }I {'j'4;.,fj; q'�i''` '41+`isL qty {llin,::e.�,::erndlliirla,;�`'ks� .IL f'i1�;m,ll'i::!tt�u Pre iminary Engineering Report Land/Right of way Des'gn/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS nmi41 E040i,�'"I;if7110,100, EUNDINGII'SOURGESN :I$iljrlltll iiiig'N'lilll General Revenue - Cash Certificates of obligation Future GO Bonds W/S Revenue Bonds P.E.D.C. System Revenues — Cash Impact Fees unfunded* Other Funding Sourcesi - TOTAL SOURCES f 'r +': :It �:''itsilh I 'tAh4b.lne{4111141, Fn L4, A6d7; .��'in l�A:,Ab . $>H1lF •h fin? • t 1G ih ! A a. 11,111, r:� .aulCITjMINN f('BDUGETrli . l� 'iFUNDED,.q,}, 1§Nr48NDGETa+.. $108,723 $108,723 $108,723 $780,000 $780,000 $1,812,118 $1,812,118 $18,771.342 $18,771,342 $861,540 $861,540 Yl ESTIMATED Peit y7NRUli1201tu?,": 520123 $108,723 0 g X111",hf OeERATINOIANDs1MAINTENANCE-ilCOSTiSAT?i}' vi?i'i* 2012 2013 2014 2015 50 50 ECTEWARPRO115:V5: >, sol I>t $0 2016 50 1 Er - twin h1 � i fH2O13c.;'i,li�'.l'.n2014'�'..nk'I ;'.i'a-it!C.207:5{�i;-aA,ki �.',.i.r:i32016 "f2.:r,Y i1,PR07ECT;mTOTAL+zr $108,723 $780,000 $780,000 $1,812,118 $1,812,118 $9,800,000 $9,800,000 $0 $577,232 $0 52,592,118 $10,377,232 513,078,073 522,333,723 $22,333,723 5108,723 $108,723 50 $0 li.4gPARildmi:0004011110iiitblligho,0:111s3ifRgni "'KfM1:: ' i5: ia{"1 :p51 }'ftT;lh i"+ _A1000141001111 �� FI .: ,I n f.. 1 ,,.hh 43.. r i Lp _t h L, I .a, TOTALIaBUDGE•T+A'MI !t`i;pGlTXlI'APPROP17I $108,723 $108,723 $13,613,000 $13,613,000 $8,612,000 58,612,000 C !FUNDEDA It , rY '%I iNii";IBUDGE7V;�1: mm:Mra;l::ML ''ESTIMATED' �'N'2U'42011i` $108,723 5108,723 $577,232 26 14 „„120it!:.,usit4RD�LI:Es:foTur1 $0 $108,723 $2,592,118 $10,377,232 $12,969,350 522,333,723 522,333,723 $108,723 $108,723 $0 1 $0 1 50 52,592,118 $10,377,232 Explain & Identify Type of Other Sources: Potential PEDC funding. Project to carryover to 2017 57 Project Manager: Project's Approval Date: Cara Davis $0 $0 $0 $0 $0 $0 513,078,073 3/11/2011 CITY OF PEARLAND, TEXAS P. R'Oj ECTMMAME k10 I! �t4iJ fp:,itlJitiejd �tl�!Ai!:.ttil`hi jr'!li1111 PER for Future Bona Referendum PRO7EGTi DESCRIFTION Otjl;?;jNj{;i; 1°I5' Provide funding for preliminary engineering on future projects yet to be identified that would be funded with the City's next bond referendum. Preliminary engineering would tighten down scopes and provide fo estimated construction dollars that would be needed to take a propositio to the voters. PR07,ECTOUSTIFSCAT10N; PRO)ECTtCOSTS 40C.FION. 1411 tn.� o.ltyll,*µ4 M R iH;1 Preliminary Engineering Report Land/Right of way Design/surveying Construction Equipment and Furniture Contingency TOTAL COSTS if l4 Outlt BUDGEi1 T.OTALI;IBUDGET, $500,000 $500,000 N;li! ; i:i dasinii':fl= 4�1 r`il;;iaP add'NY �;.;:; ;,i miis:kllassa FUNDINGISOURCESf ” "" t ' jt y,.l{f�d hu{ itli t,�ia h_ i tf i ,TOTAL BUDGEi1 General Revenue - cash certificates of obligation $500,000 $500,000 Future GO Bonds w/S Revenue Bonds P.E.D.C. system Revenues - Cash Impact Fees Unfunded other Funding sources' - TOTAL SOURCES $500,000 $500,000 1 Explain & Identify Type of other Sources: New Projects -Future Bond Referendum. -IrTYkAPPRORt, $500,000 2012 — 2016 CAPITAL IMPROVEMENT PROGRAM i bl ,4aif: L:;<is.+.2iei;flk:&t{{:!7.,:�M,i � '� j, �: I: yj,: i•ngj: GiLiy.` P,RO7ECI::, #1,. ,. i:9„,.. <:�,.�_,,...,..,t,,:.`Ii:.4�PREFBRENGEi30RDER„hu-l.ti.:..�a:,....rr9 TR1401 I10 Expenditures Personnel Services Supplies Services & Charges Capital Outlay Total FTE Staff Total FONDEDIk} KESTIfMTEDat t6I1DGEY, v-.'(itl"IRU92014' ib AORE_R'ATING(; MOMM: iINTEMNGly COSTSIMMPAlkgsi( 'ti el 2012 2013 2014 2015 2016 501 $0 $o F.ryakR;.;RO7EyfED,MARMROPRIATIONSSOI {K” OMi $500,000 1 $0 50 $0 50 $0 J i 910t001 `1 ,St `;i";p�; �' ea N, �r{`,'FP't t t r i ?1ii�{ Y' vr3?k;l, $,r 7 r.2,0;A .{ N „tf20D '�. n;sZOrB ' i `4 16' F'i4 uiPRO7EnWTOTiAt? $500,000 $500,000 $0 $0 $0 SO $0 $0 $500,000$0 $0 $500,000 eG la;; i di :g t' :_}::._�..� r.ga u:➢ n,1H"^'s,".:. y;.m*: iF fa r.5+:!-fel,aln t t54,t,. td{d.tl, ,ry._d:.,r'�..a.d,,,.. al riia2nu=L'tin::'i'M;um.�4t. inn_.._,a. _.. ,d,B,h, ., n. At a:friu' R ymNDED�14lESTIMATtE 4�, H,N rli4 2013 µft tlh4 2imr�el� tuts R�+-� O 's!i r'.�Zillf67t' PROJECT, roTAL .BYIDGET �yTHRU�n20.11,i ,;„.2012„„ d u..a .-t. x2014, tP., t �F1 �! I � ��” $0 $500,000 $500,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 1 $0 $0 $500,000 $0 $0 $500,000 58 Project Manager: Projects Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM ;� nM + :h a5.ni+4 , .I,w. L--.., ,tW,,i ,. .4 t +: 1. tl t 113141. t..:.,..1; ISM ;vn. .�,{r aI q .4:... II. I,. k,...1, .: 9 +;""9ihY PRD7EGT,r„N/,N1E dnN,:.cl.rl�I;l!I?thr�Itt.n.ra.,G«n,hll.�auiF�iixr•}u..6TnU:4.ar:::1.i1:N�:+x�'!.{tiuy.N.ii.A4:..1llc.r�ir»,i.rm..y�,..n .r.t.npd PRO]EC,7;1.,#66iI �.xLd:.t3}dr,�t1..,1:ue,{�,,,R„!�o,:s�;n PREFERENCE�,ORDERt.�J:.aR!'.i,{I MCHard Road Extension (Mykawa Road to cuTfen Parkway) TR1405 11 444, p.r; :...o'.e.;r{rat e'= s. s'A.W ?P' `:W ..41+:W1WW,WW :G+g:rW g!.;, g t ..............d!n�}y�riSli<+!!IIC7i}a,ynFr",(Vllil�:i7(IkFHnitlf;{iHlJ!t�!�Ct�INi,2:{!A!I:�::,y�fh;;l_i��"�!, l.:.r.,n!.,,:tc,,.tl :t`lCiil:;;{`.Aln�. ,... ,.ui..!.i)i":OP ERATING(;'AND,Y:M42NTENANCE _COST,$' �j} A new extension of approximately 3.5 miTes of MCHard Road, from CUTfen Expenditures 2012 2013 2014 Parkway to Mykawa Road, constructing a 4 -lane, concrete, curb and gutter, divided roadway with raised medians. Includes storm sewers, outfalls and personnel detention, traffic signals, sidewalks and related items. This project Supplies will be coordinated with the McHard Road Trunk Sewer extension. PROJECT3MESCRZPT ' ,.,i» IONfi47r services Services & charges Capital Outlay 00.07EGT;{7aTSFICATION4if!n7:1 U{WGlW{;Il°dl{UM hill!ii IWII{v;_!iif`ir{i;i Q This project is in accorr ance with the City s Major TT10roU9 Flfdre Plan to Total alleviate traffic on FM518 by providing an alternate east/west routz between SH288 and SH35. FTE Staff Total fI I �!i�ltif+t�tid . rl0JE ,IavligsT$ yi !. m iu!!IlIPRO7 R.'COS,�,�{iAL'tOC�eAI,NT�2,�'' l:�Ar«'tllwlrt�>=C'iL �'.kfi .�k�?I<!NMil Preliminary Engineering Report Land/Right of Way Design/surveying Construction Equipment and Furniture Contingency TOTAL COSTS ru!Npatis!Enouli.{:, Ili t4Jj, (FUNDING+ S W,Rr C 5 Ik; NI Is.q'{NO General Revenue - Cash certificates of Obligation Future GO Bonds W/5 Revenue Bonds P.E.D.C. System Revenues - cash Impact Fees unfunded Other Funding sourcesi - TOTAL SOURCES 541,155,664 Explain & identify Type of Other sources: ri-T�I{IV�`'�jL. -pp fI1I'TOTAU AU BUOGET. L $515,075 $3,855,469 52,135,120 $28,875,000 II $5,775,000 541,155,664 C fp i, AP1? NP it EZT ArPROP, h $515,075 $3,855,469 $2,135,120 $28,875,000 $0 $0 kFYNmoiECTEDi'mpwRRIQ 10N rt�UNDEbtESTZTol& I2'3Tamp „1rsBUDGET!NiTHla2113i 0Y2W0 204 $515,075 55,775,000 541,155,664 50 II1v?11iLiH!!i"iSe%Nittk!SyyN;Np{'}i^7taiN1IFINin'il!47's "TAL'�:SUDGEB,,. TOTALlBUOGET,r6 $41,155,664 50 C' N ,I pry' r!:�,:46.6+, , .. .. Ii'ri,f.',ktAmmROP !TI�.:FUNDED ihilTX 2TEDifr ICik . I ;CTGI;Siu1PPROP: !�?+� : �BI]DGETrt i1�.THRU�.'I;'2b"ll;%h�'�"�N2U12 $41,155,664 541,155,664 50 50 59 50 $0 311 5L 20,138 P.RWWWGmm�IWUIM �2U15i' 1S 6 $0 2015 $0 $3,855,469 $2,135,120 $9,625,000 $5,775,000 $515,075 521,390,589 W. 2015.0 $19,250,000 519,250,000 Ng13itWL'_'ry3! 2016 $0 G'rz+InNW m'otl!k'd!!4 SAWN ROJEA+ $515,075 $3,855,469 $2,135,120 $28,875,000 $0 $5,775,000 $41,155,664 $515,075 $21,390,589 50 50 5515,075 521,390,589 Project Manager: $19,250,000 519,250,000 Cara Davis :PROJECT$TOTALI $0 $0 $0 $0 $0 $0 $0 $41,155,664 $0 541,155,664 Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS PRoukt*AM;u cHard Road) 2012 — 2016 CAPITAL IMPROVEMENT PROGRAM ran P.ROJEC:i PREEERENCEOBOER Old Alvin Rd Widening (Plum Street to ': 14i x�iHl 1.'f i:u' e1.;1 :'•I, aiPmct x'?:i�:.;•tl M•Y:r '.ii PRO7EGTfjbESCRIPTI,ON,!�.!jJt iPS.:.n:ikh'I,nhfC�n<l'.,!�.d�irh}.tw.t!7i4hi!4rL::.j.,t11,,:�;•I:a,n�ad�liuvE�hmd:�tl:^';fl�.air`.!i Reconstruction of approxTmate 11.0 mile of old Alvin Rd from Plu mu -lard Rd from a 2 -lane asphalt to a 4 -lane undivided curb and roadway. East side from McHard to Knapp to have 6' sidewalks. 120002 St tO!Expenditures gutLc. Personnel Services Supplies Services & Charges Capital Outlay PROjEG'f:i'7uTIFICAT,ION;'wf!.f':!'l;f�!!�I'liihtiiji!�f!m¢i+;fCjGh!Pt:PIG`sik°diiia%'ajll�!:i!.^jt;?!!k�iiy*ij!ibll}:!N`v'�lai'%}f!'lifi;=e^ :!iii This proposed roadway was part or the 2007 Bond Referendum and will provide Total another north -south route between McHard Road and FMS18. FTE Staff Total h ;iii '':;;h`NNkl lir uPgO c COSTSi A 41;14 !;ni hu.Y i i:,<;e>l;{:�'LLOxitiilir?1 %t Preliminary Engineering Repor Land/Right of way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS 9NG>4{!N�;IBi'lf!4,i,.��4,m,lxNN��.. ....., f,)fl 1:NFtt L: TOTABUOGET- $261,189 $550,000 $544,500 $5,757,000 glial fpI IHI!}ND'IiNG8;':0 &l"ilSt �FUNO'ING.. SOURGESI General Revenue - Cash Certificates of Obligation $261,189 Future GO Bonds W/5 Revenue Bonds P.E.D.C. System Revenues - cash Impact Fees unfunded Other Funding Sources' - TOTAL SOURCES $7,838,189 Explain & Identify Type of Other Sources: Project to carryover to 2017 51.6 Million in 2016 to be funded by bonds in 2017 !r. 12 1"!'OPER'ATINOANW 1 NTENANCE^COST5'i%'f:•p!^U i4':l'i:rvV,13'.fr;,T';;,y" 2012 2013 2014 2015 2016 50 50 n..!Mi!h5Cins:kiiiiiu,..!s::h0 ilft'W m.. ,. ...._f.., - ; m N%! '. f �dl�Huiu�i; iI!4.7Nrk41�iirctis?k!uR;:1h�Kii PRo3ECT,ED,?j!APPROP�RTATION . :..��.,��,,.. - .:...,w.....:..; . �,,, as " i pet mit PRII0PaJm pGG.L IBUNpeoitii 4 HRL)i2TEa}c; jh � 0 &! nhlai 3I,f ,r _ . ociTyl APPROPk,Iiif dh:,iB000ET;pT•Sa twaRU1d011.:a alt ar'„' ong u,! 'L,14;7:F;. $! ryLG[1 ,f201 $261,189 $261,189 $261,189 $550.000 50 50 $544,500 $5,757,000 $725,500 $725,500 $7,838,189 $7,838,189 1 HNJlOi, 4WMNluI",2NftN.Ni?iMNiteti!!n1G!NiTOMPagli-IINO limom TOTAL- BUDGET,ti c YitAPPROP.. $261,189 $7,577,000 $7,577,000 $7,838,189 $261,189 1 i:HigN+t0 Witira st.BUDGEE8 $261,189 $261,189 $261,189 50 50 144}Netl44ikn12W.4r`t'ue1ri+tt W ` N ..� IhGf,.i 1R ANRIMATEU; 1- ,61?1211..7201 .7HR0*20]]'t32012?lj '301 $261,189 $261,189 $0 $0 60 50 $550,000 $544,500 $4,950,000 $1,094,500 1 $4,950,000 50 rf+tiG'e1 ""N'd wPRORECUTOTA; $261,189 $550.000 $544,500 $4,950,000 $0 $0 $6,305,689 tiiib. N4G+WIH' !fttx:fm kiNwtg:+31551 gl8 2014(Nj �.:[i...420111 705Y.... .. "3"rP'NR:71O1 7 ERkTT.013141 $0 $261,189 $1,094,500 $3,359,986 $4,454,486 $0 $0 $0 $0 $0 $0 $0 51,094,500 $3,359,986 $4,715,675 i'i«4Mu'4ii'd4i Project Manager: Cara Davis Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS 2012 - 2016 CAPITAL IMPROVEMENT PROGRAM PitdiEcTligAmEhMOMMIONWASNOWIONMWWWWONOMMORAMINW44 ilktoteVituolthininiii4VWSPint RREFEitEsicEtoSailmitMeatt4400'4WArthitotiwegici4; Regency Park Subdivision Paving TR1501 13 p4pEcTo.pcRwipmpiwoxiogommwagmagiamommgmamigmmeigullagoommonownmsopERATINcoNpoymaNTENANcoolosTsmflowigramtmea Replace all concrete paving within Regency Park Subdivision. Install 4*xpenditures 2012 2013 2014 2015 2016 sidewalk throughout the subdivision where possible within the right o way. Also evaluate the existing drainage system within the subdivision personnel Services and replace inlets as needed. !Supplies !Services & Charges 1 PkOktiiAgiditAtiohigraWMA&MilUigh4WgiaffiA§Maggigaa&a=langiicapital outlay Regency parlc is t e oldest concrete -paved su6division in the City. Itll the last couple of years the pavement condition throughout tit:- !Total subdivision has become increasingly unacceptable. Because of the naturelFTE Staff Total of the failures, it is not fiscally efficient to replace individual' concrete slabs. J 4misilmoililioproopyilummommomantAnniamominimirmoigummimsimammulumeTwAmomATIomialminaummaaramommuwikainimalaummim „4,;,!, i F593gcriop?siivapwlioN„i :4 i gl *fl 1,4* lizalhlitSSIO SaNDED'll SESTIMATEDI1 SIVAT"b1F4Ottelural*-41140frJa OW ' "Ely "ii ' '1' 11,C till' • kW Abbe' niiiiiidldfik v ginf' ' - inIS , ' b44614 h ' '''' '24:13151ligif- ' tai • fl.1 i 1,k63 'ea, tolx65 WOO lel "MI" tettaill4 iWilietifkitioNSITIM . .._ ,I.in di, },...ft.:, i,i,, W3 ORO' I, I I, • 4[: I, ] 4 OTA B DGETra h 11. aAP . ..'itr ', 1 l4 .1.. : 5/ qii! . , ' :141 . 4t ., 1 o . ,.. tl, . -1:Nia' ' : owth0: 'W14: Wr w ' , Preliminary Engineering Report $0 $0 $245,161 $245,161 $2,305,500 $2,305,500 $0 $461,100 8461,100 50 $0 $0 $0 5245,161 52,766,600 53,011,761 80 80 80 80 50 Land/Riqht of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS 1 volpsoisiglipipumis pi iirp (018811a51110ROIRGOS9URCES ile Woighi �t' ;!, General Revenue - Cash Certificates of obligation Future GO Bonds M/S Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees Unfunded Other Funding Sources' - rTOTAL SOURCES $245,161 5245,161 $2,305,500 $2,305,500 5461,100 53,011,761 53,011,761 1 50 MtMifii40i! 1! , plfigrailar ff14061P`IglifYgitibef fan '',FtillEtA iipiiintrilliniefaMetitifOrthetP ,EsiriTOT tit .BUDGE14 iiii }01.34iiik!4i:4126i4hiTiL liaqbigll0 itkokat '14 Ail $3,011,761 $3,011,761 i 53,011,761 53,011,761 $0 Explain & Identify Type of Other Sources: 61 50 501 50 $0 $245,161 $2,766 600 $3,011,761 $0 $0 $0 $0 $0 $0 $0 50 5245,161 52,766,600 53,011,761 Project Manager: Skipper Jones Project's Approval Date: 3/11/2011 CITY OF PEARLAND, TEXAS PROJECti NAME°: ";Ilihii{e;i;;i ,4A iirii;,rijtlyuiii :}iYr:4:4 Longwood Street Reconstruction 'iMN P.RDDE`� AE iergpNnwf i.,+?lt�,"iUk!idi6t9I Ilih;rAMMIti!a11B �S �mWtlYll.,,, ,,�w Replace existing Longwood Street from FM518 to Myrtl ewood Dr. with minor collector profile, concrete curb and gutter with storm sewer. Also removi and replace 12" and 8" asbestos concrete water lines. Add 4' sidewalk on both sides of road. Also complete similar work on Paul Drive from Longwood to city limits and McDonald Drive from Dixie Farm Road to Longwood. Some pipeline relocations may be required. 2012 — 2016 CAPITAL IMPROVEMENT PROGRAM ekoiEbt;i'M�:'r%IhAt>;v yt TR1503 FRO_7ECtildusT.Ii_CATIONIMii,".;,��X ___ __ — A'15 tFi ree of these streets are in the Thoroughfare Plan as minor collectors. The project is recommended at this time because of ongoing drainage issues. The City of Friendswood is beginning construction on Melody Lane (which becomes Paul at the city limits). The newly signalized intersection at McDonald and Dixie Farm Road has increased traffic on all three of these roads. Md 'ftPR0n.F':i:':7;+1;'iO O 4:Gliy'!`tI;ii�',Ed0 F,"!I'Q1CP•Roncir COSTS�:ALL'IOCmamp �,1 ,ud�r, �. 'i:�$';:n. ,..:toil t•:I.�..Ni....ir,...,. d, ,«tIh i X411'„ ,1R � . h h Preliminary Engineering Report 1Land/Right of Way Design/Surveying Construction Equipment and Furniture Contingency TOTAL COSTS i!',ilirlt tdL�'ttihNWUM jFUNDING SOURCES" i.'hvt>(li.ii.ki i 1� f ll?SIJu>•4?if!!lYi, General Revenue - Cash Certificates of Obligation Future GO Bonds W/5 Revenue Bonds P.E.D.C. System Revenues - Cash Impact Fees unfunded Other Funding Sourcesi - i441[ Sh .0 Expenditures Personnel Services Supplies Services & Charges Capital outlay Total FTE Staff Total 14 m, �:r:130PERATSNG`�,NO+A1AIN,LEN[iN,CE�CO575jP.. .� °'4:`1 F"�'�•P rti r:s r7A la'7<a 2012 2013 2014 2015 2016 50 50 U di '' 1 !;tj4n'_ 4F;yi9iii"': K,,.r.. "95•=1' 1:"'' E ai1M"r"yMMEU 'El" EX PROBECPEO'AP..PRO, ' NS, is kli I. il,lhr,�,l4.r�..hini._ L.:n.H. VG'k'u :94, r, 441: ^4�. r:Isr. u.,. �4 Mata "-rvc .� - .- h. . PSUAT,IO Jr; fn.1$ 1 " I' nFl i:lt!'i'cY I N, "'u ..T'i�"ti : , _, r. t, ,,,,".iR , ea '.: , , , , , ni L1IBJDMru hW',L1ri1:,p!94KP'PROPaillI,'i1,FUNDEtii3ge ThRLL2033V1!;5_`5t1i,;20i2 l ,�;�013!.i'�l r,r �t iTOTAL ,BUDGET::IIS iI n,CLT',HAPPYtOP,:t:,„^.�';!Bl1D;GEf;'j,"v k�TNRUAt12Ul'1:.,,, �i2012�im,.�,n;5t'20`3.'3';gj�, $500,000 $491,404 $4,814,035 $500,000 $491,404 $4,814.035 50 $500,000 $491,404 50 i5 µ2�J.',SiJiei;'d,.'lr.$5;i }`ea,� 20L $4,814,035 $1.203,509 $1,203,509 $1,203,509 57,008,948 57,008,948 50 50 SO SO SO 5991,404 I 56,017,544 i,, nriwire 4":O*L4 ft t5f w{;, n.:anon,,t44630.s:natWP:441414 :��t1 1100-iT'�.fI� 191 1i�(y''!I'I1f ,Ili jij$* iii 5E0TA5 i I t hill 5 i ' r� fill :6 ffl 4Ii aTOTAL�I!BUDGET rF IirifClTYtIrAPFROP�:f'�: ' $7,008,948 $7,008,948 TOTAL SOURCES $7,008,948 Explain & Identify Type of Other Sources: Comprehensive analysis to be done on concrete streets to create plan to include in future bond referendum. 57,008,948 50 'Y 'fin$ d'Y5y.�"'��.. •tl rPi f � } . E tp . 37,il 'RO�ECT:T07ALT:ii $0 $500,000 $491,404 $4,814,035 $0 $1,203,509 $7,008,948 04n5.e4 5j_ifilai tlin:k::EJzos:17 t-sm::;;,ntmlis 10WW 1p 1�41'::iui �:PR ]Ec.l;•'u� $991,404 $6,017,544 SO 1 SO S0 1 SO 1 S0 5991,404 a1Project Manager: (Project's Approval Date: 62 56,017,544 Skipper Jones TOTAL,. 50 $0 $0 SO $0 $0 $0 $7,008,948 $0 57,008,948 3/11/2011 FmnogovmpagammavammAppwpwwm41 SL los 9T0Z 0 o$ I o TT9'17£S'E$ O$ o$ 1 TT9'4£S'ES I Project Manager: TBD Project's Approval Date: 3/11/20111 1 M 17, r lir 0' Oadr 8.1. IngegiiIMPIRM 1 EOL'L6$ 000'005! 190t'S61 1 T95'SZZ'Z$ Tb6'ZTS$ 0$ I TT9'b£S'E$ Z0S'TbL I lug O Ms15 STOZ i u 14-N >'iliat5?!I?Y?C!?Ctl`I A womaistateit 60T E61$ I VTOZi i i m 11ih i^+5mJd T9S'SZZ'Z 1b6'ZTS I 2,741,502 I i M5 0Z 7r`l' 1 £OL'L6$ 000'oosi 1 90b'S6T1 05 I 160T'E61$ I Ak3JN,ti'a31NIE tTOZ O Explain Identify Type of Other Sources: P.E.D.0 could fund costs associated with optional upgrades in lieu of standard specifications (street parking, back of curb pavers, stamped concrete crosswalks, and decorative lights), subject to review and approval of the Board, 51,242,224. r' ETU 0 lotpai iiO4 gsNottial los I 0 16:06: fled: los I i a vt aN -S r ar'd:;,# u3roae{ V0STai1 L 34OGxi ZTOZ TT9't£S'E$ TT9'b£S'£S I ?ai@v�114 los I Expenditures Personnel Services seLLddns Services Charges Capital Outlay TT9'b£S'E$ RTE Staff Total r ;ry,;mp:l;mml AREOHO i nwx i r tig 1y1p0 4l'i540liI R g 5 aefin (General Revenue cash (Certificates of Obligation los it ,ilk ki 0e_yA.iWu2'A,tlf µwli'M{b!Uia t( I} I' d .M'lJEUMi {lliry,u(EN. iiOM:MMI3WtM?Nl73PA rGrand Boulevard Reconstruction PRO]EC"¢:OE'SCRSATIONfiM INWiOROiI MIfO 1G M.ibtifts:n1F4NAA( Ihj NN,R'utlMO,$MINI Reconstruct approximately 1,300 feet of Grand Boulevard from Broadway to walnut Street from one lane each direction to a Boulevard with one lane each direction with angled parking. PRO]E_C.T F']f15 T2 _FteATIWA,ift, tIK{ i; f` 4?i, ii,) A: liMUt✓WOMMOU i;ii: {[UM iuO�t14._U!SglE j prop this osal ST streets will implement the goals and ob]ectives oT She Old Townsite Plan. This proposal will be critical for the success of the City of Pearland's Old Townsite. 1 u 1390n0 r 030N0"i0 X 5 3 (Y05 O Gh M 19NfaNnd ''rFilgn'iJ� a rx �hli l q i I l FTh,iib2IIJI iilJllig) i4,<<i 05 IMINWOn lababgg EOL'L6$ 0oo'00 90b'S6T'. T9S'8ZZ'Z$ Tt6'ZTS5 TT9'4ES'£S 1 1 9 yt e Ti ma soh 5Mr's?RINV EOPL6$ I 1 oo0'ooss 190t'S6T1 1 T9S'SZZ'Z$ I Tb6'ZTS$ 1 TT9'tES'ES 1 'Preliminary Engineering Report ILand /Right of way_ (Design /Surveying (Construction 'Equipment and Furniture Contingency (TOTAL COSTS Imimi1iIyj s i4 s c m ISO aitimomo 914.0400 r173COad i IM YIY'ikhri I 1'as' I o los los 0 o$ I o TT9'17£S'E$ O$ o$ 1 TT9'4£S'ES I Project Manager: TBD Project's Approval Date: 3/11/20111 eutthia i' :003.0 rc 9TOZg SOW 9"H".!O d:Ikl "ti ii x Z0S'TbL I I Z05'ners I 7 i u 14-N >'iliat5?!I?Y?C!?Ctl`I A 60T'£6L$ 60T E61$ I VTOZi i i m 11ih i^+5mJd 05 I 0 Explain Identify Type of Other Sources: P.E.D.0 could fund costs associated with optional upgrades in lieu of standard specifications (street parking, back of curb pavers, stamped concrete crosswalks, and decorative lights), subject to review and approval of the Board, 51,242,224. r' 0 T M q fi. a +s..n OAAa.�55 pwwwwwig 0 oigosmorog 030Nn OS mop i{i6;iPhp�lIGj11 TT9't£S'E$ TT9'b£S'£S I ?ai@v�114 TT9'b£S'E$ 1 TT9'tES'ES r tig 1y1p0 4l'i540liI R g 5 aefin (General Revenue cash (Certificates of Obligation !Future GO Bonds I w /S Revenue Bonds P.E.D.C. (system Revenues cash Impact Fees unfunded 'Other Funding sources' (TOTAL SOURCES X 5 3 (Y05 O Gh M 19NfaNnd ''rFilgn'iJ� a rx �hli l q i I l FTh,iib2IIJI iilJllig) i4,<<i co 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS C9 u a. o CN re 0 z Lu 5 z N CD 0 0 ti, r z it7l +dik�'9 g L,,d 4dQ%�3JN3N333N d 9T0Z 'I,I gOM amtrP o I os I o o 1 009'499$ lo 05 0$ SO.iD3'I atm I 000'oo?s 000'161$ 009'26$ I o$ 1 000'17/$ 1 009'1799$ 0 I o$ 1 5TOZ flOttgita 1 bTOZ p515OD 90 05 l;' +.'9T0 fNN4t196'l I O$ I OZ' MSS lVN�J 1 0 'itit0Zp!: fi Rwituizitki F$ 1 05 1 1 o Fc MSAG 101 N ID$ 6080VM TR,'IM S m i.T,f t 4 r, hn N i .t' #,.13,3 COZI $202,000 1 000'202$ I 01 :04 1 O$ i fl No 686,000 642,000 1 000'17LS 1 1 00o'Z0Z$ I Wu LmmTi4itw,0 a17ilisk'' w02.ER Expenditures Personnel Services saLLddns Services Charges (Capital Outlay LEIOJJ FTE Staff Total VI 01 hhttt aftoutoomfg 1_ 1 000'0sZ$ 009'ZT$ l9 r ia�Oaaa�q 6 in �G'ti h l 141 J !1' JIt441Skl;ip!jml'"'9li $462,600 auL421EM E1L∎pl aB ivameai i 4,t y {pJ'F4,?l t Nh jSi1'i iw,- „k,h'til "rylF<T ,t ,'.i L ;M C08d PROJEGUIii CRIPTOJOI IItM lu' L,' l' 7 ryflh4Mf11,+..} IJ: nWl! it'Mtiljf!!I;cRIi,, IGlliWO, fia.$.r±Jfd 4`!49 InStd� 12�� Wdter n2 from BelldVi to subdivision to DlXle Farm ROdd. TOtdl of 3500 ft of 12” water line. I;lPWO sy$ Ii$ Mu!L:IJ "1'4L. t4fji'atM}!!.i H,. X11 t ,i,! 00OS 1VDIaLLsL!C!kJ. a40Hd' Project will complete the water system loop, providing an additional source of water and improving water pressure to the area. VAM ji,°+. htv;iii+3i't;t1Zi9 000'002$ $12,600 5250,000 1 009'1799$ 1 1 009'Z917$ 1 $200,000 1 000'Z6Z$ 009'86$ 1 000'17/$ 1 1 009'499$ 1 Png W PM 009'499$ 1 o loanst VMOMMA Mono ono 1 000'00?$ 1 000'Z6Z5 009'86$ 'Certificates of obligation 1 1 $74,000 1 1 5664,600 1 1 •J•O'3•d► 1 Ii 6 1 4 0. ILand /Right of way__ Design /Surveying Construction 'Equipment and Furniture 1 'Contingency 1 'TOTAL COSTS A3 A OW WW W4 I 1II M400110 0 rVI9l'9 w o rarnmt:nfg o I os I o o 1 009'499$ 05 1 009'17995 Project Manager: Public works Project's Approval Date: 3/11/2011 no t 1 0 1 0$ l;' +.'9T0 fNN4t196'l 1 0 'itit0Zp!: fi Rwituizitki 1 o 1 Explain Identify Type of other Sources: $202,000 1 000'202$ I 01 :04 $462,600 1 1 009'294$ FTTOZ, nblt[e 5 1 'iin:ti5ttgl tr 1111,, Waage !Ati�7!`6 u;r(P(ungrr9l 1 009'2917$ 1 009'2917$ l9 r ia�Oaaa�q 6 in �G'ti h l 141 J !1' JIt441Skl;ip!jml'"'9li 1 009`1799$ 1 009'1799$ 1 1 009'499$ 1 009'499$ 1 9fYM211 I {i P ��aMl��i� S� 'Certificates of obligation 1 'Future GO Bonds 1 Iw /S Revenue Bonds 1 1 •J•O'3•d► 'System Revenues Cash 1 'Impact Fees 1 Unfunded 'other Funding Sources' _I TOTAL SOURCES i �1 Y,LEM 121at' 51 W .'tM 1ihLklmfLEhal H H V CO CO 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS 105SMONSUINSOMSROMMVPHoiriMPMPASII OS OS I O I VEVE715 I SZVOWTS I 000'000 $303,359 I 81L'9SS'Z$ Project Manager: Cara Davis Project's Approval Date: 3/11/20111 mmitoppavfm!qpil IIMASIAMMANS6 itinsmissime 1.&11DIE, glirtINAU R■tkLO RORak; Mir 01 'NBA° MTffi RaTO4T11 SATIN mNsmisiwA I OSVSLZ$ I Rie9SS'n frio 29IOZar psAA tale AWKIROM I os I msTRP I as I STIR I OS WOW &W-ITIOF maiffkJ,j'olzsi JOTTQWWq 140Z I os I WONT MirOMPOW WOW WANTO Nes los I los I 1 Explain Identify Type of Other Sources: Project Management in the amount of $50,000 provided by City staff. Not in numbers. 11 .11 1 ,9". 4kg4ingdzalbg RWMPPJ-NOMMIOT 162'902$ 1 000'0G0'T$ 6SE'EOES $2,110,250 I 44 404T41 1 4 V OIVVItig?gi qtnnwl*,,Itgwali4, WWWIMMgliM los I I vsz'szzl I tEVEZZI NV4:06 TOTTVm 1 89t 410 40hOgdsloAq'T a:za&L&Ja,,L,u W.TiMM&WPW AM) OAS viva ZEZ'FZZ! t'EZ'EZZ! 89t los I om imo p oNN WO $4.060NmOmil ANHoNNANANNANNPN Expenditures Personnel Services so j Lddnsl bEe£ZZ$ SZT'OEO'IS 1 000000'IS 6SCEOES $2,556,718 I NARMNIMM NAdmihioNNAINNO ANANNAANIANNANN 000'SWIS I $1,030,125 I $223,234 I 000'000'TS I I 6SCEGES I 8iL mwowas „00,41,1410‘4 INVOflItiNAPWRT RIW10*** 010SUIPosOOMAlikeMMIP4i General Revenue Cash Certificates of Obligation 1Xur 1 'D'O'E'd1 System mrue- Cash cash 1 IImpact Fees Debt 1 'Other Funding Sources' 'TOTAL SOURCES 105SMONSUINSOMSROMMVPHoiriMPMPASII 910? mmitoppavfm!qpil IIMASIAMMANS6 itinsmissime I 2178'6Z$ 1 S69'6ST1 SZ6'9SZ1 1 °5 000 I OSVSLZ$ I Rie9SS'n frio 29IOZar psAA tale AWKIROM I as I STIR 140Z WOW WANTO Nes los I O S ETOZ #11 SOO memsto los I NV4:06 TOTTVm ZTOZ AM) OAS viva los I Expenditures Personnel Services so j Lddnsl se6J T sosi.AJOS1 Capital Outlay FTE Staff Total umploga9 restuggSt 49140110140AWN 000'SWIS 1 osz'sus I osz'ors'zs toi9Alia4P0o ROMMRHEMthlg 1 ovvozs i256,925 159,695 (000toss) 1 I RW9V17$ VVOMMRAWRIUMNTRNMOMENNOMNAMMUMMUOMMOM44NoPPoOM Old Alvin Road water Line 13,200 Feet of 20-inch Water Line along Old Alvin Road from Magnolia Road to McHard Road. ORoOk0FOOStiMo*TioNTOMMOORSEEMESEMMUNUMWMRWOONOWASWg0 This line is necessary for the distribution of the City of Houston connection. Size and route are based on the City's water model. RVIIPPRCIFY Ifira0444 FRIMEIMMT Rb2'6L$ 569'6STS SZ6'9SZ$ (oocNoss) 29t'944$ 1 swots 256,925 159,695 00o'sgets 1 osysLzs 1 91L955'1$ olidavgwpoll COMM =mow Mai *WIN 1 oN s'oLl E!!c 159,695 1 000'S9L'TS 1 I osz'sLzs 1 1 NEL'oss'is 1 FIVIM SIMS COON 'Preliminary Engineering Report I Land/Right of way Design/Surveying Construction Equipment and Furniture 'Contingency ITOTAL COSTS TilD mlivi t[ hil,;.iltl 11,1il:41, 411,, 10!LiPt 6- i0PII 000 7 10 milisisoNitorom4M117 1 4 LhOWNMPIPPAPTION IA NO TLWWWN4iffig4 hi T4,1L4gif otTiMih4 9 0.0;d0.- u 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS V n'rxn+Srtii%Ltg w MaRgeara na 9TOZ lo TVlal SUMAS los 1 oos'b$ 1 los 1 1 90£'LT$ 99£'06T$ 1 E$ 1 I STOZ 1 0$ O wIus ismovirot 1 o$ 1 SA014 bTOZ I 1 o s 1 At m SO grmi IR N31191tlW!'ON I £TOZ I°$ SO NW s l}if' ft$RMSRotts9 I O$ LOZTVMI Ti'r"'3 =N.tJ. 4' G u 114 t #,,1ll3CONa1 Ha$0,01 d ZTOZ 1 I o$ 1 sa.Jn1Lpuedx3 Personnel Services sal. LddnS sabueqp g saopnias Capital Outlay Leaol [FIE staff Total ESMIZT Nu I3[0 .46021 a Mi1g a M1: 1 oos'vs 090'2T! 1 oos'os 90£'LT$ 1 99£'06T$ 10$ 1 OZ 4I,leH 'L 1 1 14MOIC 0R0UOI f OIL A ri, 1 `.{NMM"-I'Ni:.'.�NEM MMIN: tiOU1f1e.ENM IE Pearland Parkway waterline Extension u wY,c�c um �„wac�n loop. Total of about 1600 if of 12" water line. p v40$ `]`r,NaR Sr tlnail'. i.,' Mill h199416T4TJ C403CQ?! Improve water quality in the Town lake Estates and shadycrest subdivisions. c.1.3,900,E: g VADMORWORS los R4 9, **OAS y 1 oos'ost$ 1 1 90E'L1$ 1 1 99£'06T$ 1 s I E$ 13 anagca01 It?l! 4sir`I;IxIu1Y Oos `b! F090'815. [5b s'OS 1 90£'LT$ I 1 99£'06T$ (Preliminary Engineering Report (Land /Right of way IDesi gn /Surveying (Construction (Equipment and Furniture (Contingency 'TOTAL COSTS NOI thaw I 1141li11 11 y v]'l C l 111i oir$asopl sfo3 C0 ill i �9i h ssAT Y 1 s 1 1 ai 0 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS 9 i+q!' 4he,t4ti,1t:``1 E�1' ir, u!+. i` L' i`t_ s`a'tirk83�d404'0]N3 910? IISMOIRINNMOW o o 1 0$ 92T'8T£'S$ o o$ Io$ I T20'S9ES 106'060'L$ Project Manager: Cara Davis S00'L08$ ILE'b6Z'b$ 096' ZZ£$ tza'858$ 0s T06'060'L$ 169'L08$ MNOMOSAR 0$ MONTS 1 os Matl sil I,i' t Dj'',<klN I o$ I 1 o$ 0$ r oz� MINS 590`560`1$ o ETU a T70'69E$ 1 980'096'1$ NBNI£T''UZO MTIMMTIR 0$ NimkgPuTtiM SWUM Riliel jMERISN 980`09b 1 9£0`998$ 1 980'09b'T$I TOZTbm ,NrtNbralNl4rti +t!li'R 5 PSNAirjti #"1D3[Odd Explain Identify Type of Other Sources: to Sj i RT1 nimew 0$ $00'529`1$ wawa Jra ISSN Q LyntdoB;ad S8Z'bE9'2$ $629,857 $3,464,142 iliir1R1540644415bbilailla06 Expenditures Personnel Services saLLddnsl Services Charges /Celan() LE14dEDI LEIOl FTE staff Total 169'[08$ 1, Ztp'Z crr yer ]3irnatOTl3 'N,5 1 500'2088 I 096'ZZE8 LTO'6 ZZ$ 1 £L9'991'2$ AWAWIA tlnMlil'IriRIN NI'N o$ t N Lu m TE ea puEHDw rl +it^ a hN lr �'(hH ln id i ti, it 4 LG itavi a' {Y 1 -h 1NtlN '173 CORE. currently served by the City of Houston Connection at FM521. I: This will be a second continuous connection between the east and west sides of the city. It will allow for more efficient water flow, better fire protection and the movement of water from the expanded Alice Street water Plant. The water purchased from the city of Houston Connection at Alice Street will reduce the cost of water purchased from Houston by approximately $1,000,000 /year. s i mum 9LT'8T£'S$ I o$ I b0L`L06'T$ I s 1 ILE'176Z'VS 096'ZZ£$ bL8'SS8$ 106'060' 1 'LOSS 88ddi9 t, i 1 41t�ili;t!�iRN it MIMPAIMON 1 S00'L089 TL£'462' 096'22E1 t LS'SS8$ I T06'060'L$ LtiI�BtURG 6807,691 r 'General Revenue Cash 'Certificates of obligation 'Land /Right of way Design /Surveying Construction Equipment and Furniture Contingency 'TOTAL COSTS 040W0 RO H 1 TS' 4L oc i,Iro 1 4NSIA* -111 rCOST6�,'NA,I'N'4SL'DCA"'"'Y W d i i 4 Y ,Vi N r Prelimi Engineering Repor o$ o o 1 0$ 92T'8T£'S$ o o$ b0L' lob 'TS I T20'S9ES 106'060'L$ Project Manager: Cara Davis Project's Approval Date: 3/11/2011 Nom 1gtl� 1 {N 0 ,,t 1 t�� t'1'J3 G �08d� Hil ir'.kP t 9 HN` S; t M'. 3 NiF Fu °�it,N IN'H� 1 os IOW Aging ht tMil N... 1 o$ S{M%R@at "lM,gi 590`560`1$ T70'69E$ 1 980'096'1$ NBNI£T''UZO MTIMMTIR 90T'86S'Z$ 1 9£0`998$ 1 7Vt'b9b Explain Identify Type of Other Sources: to Sj i RT1 nimew $00'529`1$ 1 999'165$ 1 £L9'991'2$ IF 4 0 "'0 87NL" 1 0 'n" s z o 31VWimJ$ 3 rhHi er i'?,r1Hipl;i -t h e o IM 9 M{N ll tHNMMAMlAb 1 0$ MMVOYOMPI WitaithaMail 9LT'8T£'S$ b0L`L06'T$ 1 T20'S9£$ 1 T06'060'L$ 9 N"1M0 8I6tIV 911 r� 1 11h r 0406 (77.liH k"Tt 9L TT`8TE5$ b0L'LOb't$ I 170'596$ 106'060'L$ I 'General Revenue Cash 'Certificates of obligation 'Future GO Bonds w/5 Revenue Bonds P.E.D.C. 'System Revenues cash 'Impact Fees Cash 'Impact Fees Debt 'other Funding Sources' TOTAL SOURCES iii 1 I� 1ar' iii4Il I' UIb5� 3n (N"I�l l. H „NMI 14 0riN dtr�IN 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS fr WASahalla 118888$138338$13ei$0 los las los IDS 1 9£6 l os 1 9E6'SEE$ Project Manager: Cara Davis Project's Approval Date: 3/11/20111 00414- aiMOD13 WAPPM SW* W$81 I os__I viggimmam w 1 Explain Identify Type of other sources: MOM Plgte; 1 610'09Z$ 6T0'09ZS Meh U4113i$P8 wgro4 girt81183$ 1 LI6'8L$ LT6'8L$ 11 ROAo44n C"Ve.1011040$. 1 Lint% LT6'8L$ OIMMMAA WMAAMAiral Rimmumommum 1 96'9E$ 1 $338,936 1 Wel ;LI, iliMi?-4,g vsolAwmmil 1 9E6'88£$ 1 1 $338,936 1 uoinnbi-igo ;o Sa2DLJL1JaDI !Future GO Bonds Iw/s Revenue sonds D'O'E'di Lisup senupAap wapsAsi iistp spa nnndwil !unfunded lother Funding sources 'TOTAL SOURCES gSVD enupAaa LeJauaD 1 1.1 1 162. 0 0 OMMOSIONdadalie H H U N 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS o$ hlvto (9..YEBCOaae .ii�tyxf LM.iil'litnu�'t� t'3 ti ti?i1 °iigMF OE 0$ I oos'ozZ'T$ 1 000`T0T$ OS O$ OS 005'OLZ'T$ $2,592,000 I Project Manager: Teresa Battenfield, P.E. Project's Approval Date: 3/11/20111 4 ge ;118,000 ;270,000 10$ 0000o8TS 1000 1 000'765` Z$ I O$ I()$ V��s -erA{1Tgli gi kola' {I "1t oI it nc t, t> 00S`600`TS 005'600`1$ 1 000'610'Z$ I WARM r' 1 "ryetN-iel'r'IP;'.'7iti ami 1 000'1Tz$ 000'197$ 1000'ZLb$ 1 2 000'617L`TS 000'OLZ$ 1000'6T0`Z$ DIOZ 1 O$ 1 Explain Identity Type of Other sources: Inter local cost sharing agreement with Harris county possible. 000 m' WOW al$NOIIV ;118,000 ;270,000 000`101$ 000`ZLb$ I 000'T0T$ 1 ISZ Vig TT r n T4* ININ N' 1g. O$ 0$ I 034NW H ":1 tlf+l gili NORM moa8?UEa; 10$ I 1 0$ 1 AiiglifaMAditithigdA kA ?9iFlfl+tau?+vtii!i &'t7:!!AiIIM 005`OZZ'T$ 000`T0T$ oos'oLZ`T$ 000`Z6S`Z$ 1 Rviffilow 005`OZZ`TS 000'T0T$ 000'TOTS 00S'0LZ'TS I 000 1 "1 ''m8170 Services Charges Capital Outlay Certificates of Obligation Future GO Bonds IW /S Revenue Bonds P.E.D.C. System Revenues Cash I Impact Fees Unfunded !Other Funding Sources' 'TOTAL SOURCES PRO]tCTMAREr" ;ra;i :u! ,Il;r' tYilnrNOMr' 9!i!r"n,+HMull ^.itllLtl.l4l.,iWWi;,fii:{i;;Ol' nr;M'i nvfiM04 Fellows Loop PRO] EC7i: 4ryj'. «lih$` U"}ON AR.uTi({pUhMO ?C9l.nh5NAm "Nrlm'af To install approximately 14,400 feet of 12" waterline to loop from the termination of the existing waterline along the feeder road of BW 8 along Fellows to Cullen and terminate at Hawk. Approximately 1250 feet of 12" waterline will be completed by Public works in 2012. POSMIPORAWOMMOINUTNEHNNOWTOMOOMOMOAMUNPTVaMPaPc001 Looping of the distribution system per the water model in a location where we have a 12" main that dead ends along the Beltway. 139Q 43e{y'R a 1? L',:!ur h �IU i Ltll� ifrr II l� ih iNDI fll I,�b j ih ?TOf !!l If �UNG OORC� r ang11800140WMAM General Revenue Cash L O£+!N ^r+cw'"'-„¶¶i %-"Mt ,r�ilaS n `-:i?i 2k Na0a0d3DN3a333ad: LOIMO RTIMMil 9107 In$ 000`178$ $0$10 10300aax l !iiiWITU:°;N?iln'7jiiN: ;118,000 ;270,000 10$ 0000o8TS 1000 1 000'765` Z$ I O$ t> O$ cum wORM 05 000'617L`TS 000'OLZ$ 1000'6T0`Z$ DIOZ 000 m' WOW al$NOIIV ;118,000 ;270,000 000`ZLb$ I £TOZ O$ 0$ I NORM moa8?UEa; 10$ I £OZTVM 'S a'i'l; f��o.n3iljh.i tlr ri1 M9tf #.n173,cou2!. ZTOZ MOO Leloll FTE Staff Total Rviffilow 1 000'15$ 1 000`05$ 000'TOTS +H rar ?".w lrilllF�+IiIhP �"wrm+llitiFillt�K?i1: Expenditures Personnel Services sa LLddnsl Services Charges Capital Outlay OtITOZ,$naN t �i�^t'dy?r�t#kt OS PRO]tCTMAREr" ;ra;i :u! ,Il;r' tYilnrNOMr' 9!i!r"n,+HMull ^.itllLtl.l4l.,iWWi;,fii:{i;;Ol' nr;M'i nvfiM04 Fellows Loop PRO] EC7i: 4ryj'. «lih$` U"}ON AR.uTi({pUhMO ?C9l.nh5NAm "Nrlm'af To install approximately 14,400 feet of 12" waterline to loop from the termination of the existing waterline along the feeder road of BW 8 along Fellows to Cullen and terminate at Hawk. Approximately 1250 feet of 12" waterline will be completed by Public works in 2012. POSMIPORAWOMMOINUTNEHNNOWTOMOOMOMOAMUNPTVaMPaPc001 Looping of the distribution system per the water model in a location where we have a 12" main that dead ends along the Beltway. 139Q 43e{y'R a 1? L',:!ur h 0$ 1 E ;118,000 6270,000 000`002`1$ I 1 000`07£$ 1 000`z &s`z$ 1 00`t85 POW 718,000 ;270,000 000'008`1$ 1 000'07£$ 1 000'Z 1 )'t8$ 90 08 1190 `01 Ii 11 I1 i I Land /Right of Way Design/surveying Construction Equipment and Furniture !Contingency 'TOTAL COSTS 1 rgineer u co 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS INiiittRaWWWRAT.1100.93POW41 Io$ I'p!' r' Iifi+`tl'h;' 9T0Z (o$ (o$ 1 E90'9655 los 1 o lo s 1 £90'965$ Project Manager: TBD r etTowir" ISa3DObd'r d los 1 1 ZL9'O£$ $511,203 lo 182T'bS$ 1 £90'965$ STOZ 1 0$ I 9T0'Z� 1�., S iY'i Emmons Io$ NAL J, MOM los I o$ 1 tTOZ 0$ NUMMI 1 0$ 1 Nano wogs WOMONSMi I o i' *A31NI7Nj_fi £TOZ 1 0$ 1 Explain Identify Type of other sources: 74 a iiryzitq ��iAAMI :h,cu. Hu los MON MirsfsNori 1 E90'9655 I o$ 1 MEryi..n„'h ti I: #!t,1R3["08d',I t0ZTVM ,orMIONL:YL3d0 5em u v PE•4l{!il'..I ?TO? l 0$ liN !tiI![di los 1 ht, iO3�ON P2'r.SiSi{51L9WW 10$ I Expenditures Personnel services sai_jddns sa6uegD se)LAUasl Capital Outlay LE101 FTE Staff Total I ZL9'0£$ I 1 E0Z'TTS$ I 1 88T'4ss 1 $596,063 W al S Iii iikiillF 'r,p! ;yi!t?(L`iiitlUt@IH fl OTOZ*' naSl y 4431PTIlp3 T Mils!: I £90'965$ 1 los I I Water Loops lWAcTa_ pt5PkgTIOI ;IiIt{:!dl�>,!6!,JIt7�,�ii4 ;t {,.�,f ai!�.uI.hifl ��i:ttl�;�flu�,W� Th �'yif$'b�f�i?'f[Y UN Add on to water lines in selected high- impact areas in order to eliminate existing dead ends. we estimate there are over 600 dead end water lines in the city. This will likely be an ongoing project. The first year of the project specifically addresses three subdivisions (Oakbrook, Pine Hollow, Sunset Meadows) east of Dixie Farm Road that include 30 dead ends. uo p.e6Lgo 4o saleD i4 «.aaD vyvt.cni yua111_y. aivv L ,a,.vc.. .,y IcHuilcu mvnyvly flushing of dead ends. The three subdivisions proposed are responsible for 125 water quality calls in the last year. 125 calls constitute 22% of the water quality complaints and the amount of water used to flush these areas equals 25% of the city's unaccounted water per year. vornanwiA WON D 0 3 d( (system Revenues cash saa3 aDedwl( (unfunded 'other Funding sources' (TOTAL SOURCES 08 1 30,672 1 511,203 54,188 1 I 596,063 aaaa u viy ralb 4 S ;u; p4hi Z[9'0£$ £0Z'TTS$ 88T'bS$ E90'965$ WOOMO ihIh Rini UN IN 1.�odaa 6u paauOu3 ,(feu Sw!-LaJdI Land /Right of way Design /Surveying 'construction (Equipment and Furniture (contingency !TOTAL COSTS �jinlf Nov NO,I thg-44 3JF 1«'' yr" 4o �!1 I iMtiW 3LOM: fJ nloi I� p :ixi:lipg!:r, mmisKtromso Io$ los lo (o$ (o$ 1 E90'9655 los 1 o 10s 1 £90'965$ Project Manager: TBD Project's Approval Date: 3/11/20111 plot AMMO 1 0$ I 9T0'Z� 1�., S iY'i Emmons los X4 0 i, iii, W,`"iS.! mN°Ms::Eossis1r,•1 1 0$ 1 Nano wogs WOMONSMi 1 0$ 1 Explain Identify Type of other sources: 74 a iiryzitq ��iAAMI :h,cu. Hu 1 E90'9655 1 £90'965$ r ,iTTOZr „lu.,!�? �yII gIN 'h.:. :uriWxrw�fv: tt f wl M ,'!yiV1"�.5,a'l'. I los 1 ht, iO3�ON P2'r.SiSi{51L9WW 10$ P 1 iaoaaaw+ilN RIMTat ifflosqsflonmloP 1 290'96S5 1 E90'9655 W al S Iii iikiillF 'r,p! ;yi!t?(L`iiitlUt@IH I £90'965$ 1 £90'9655 1 (General Revenue cash uo p.e6Lgo 4o saleD i4 «.aaD Future GO Bonds (w /s Revenue Bonds D 0 3 d( (system Revenues cash saa3 aDedwl( (unfunded 'other Funding sources' (TOTAL SOURCES Rpfl ljNA;!lhMilo I1� A itj1 1 �''1' I� i II I Vf th MpN 'ISM iiitp !Jll�l OW h, Cpi #4 "IJJ7«J01 rti 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS WE ..E4401110: IMO Y ham ;F W111' los IUMBNIUME 9T0Z 1 056'991$ I los 001`28$ los 1 050`t5Z$ los 1 00t'ZOS$ 1 omman oaa Hi 1 0SS'ZE$ los $49,250 1 1 000'OSES I o$ 000'ois 50 2 1 00 FLTi- :d'u4: israru.3e STOZ os I an vi ESEMP WW1 1 lirtg mammal I os J1S0 3D Ni, tiTOz s 105 u I os 614:4 PANRMOI 1 056'891$ J31t3F,YW{ O £TOZ 050`TS25 1000'ozys 1 O$ MOM EMETTIEED COVE 9 1 11 4i4 P I I os h p $6 4 3:0 a 1 ri, X101 J.03 C 90ZTVM i i ,9N$1v,400'4 ZTOZ T94114 wi!° 3dOaddvi !d31 1 O$ 1000'OS£$ I I o0o'OL$ 000'ozb$ Expenditures Personnel Services sanddn5 se6uegj 2 SBDLAJBS AEL1nO LE$I -d 27�1 I o$ FTE Staff Total 11 t I os8' I I osz'6f$ 00t'Z2$ I 001'28$ kt ih 16. ES TIMA TED i ii+;THRO= p:1U 001`205$ I mitallISSE 1 056'891$ I O$ I` Y 4 WAM;ilC9i A Esis,op mio;mt I{b,t1 s1.gt+1rmHkNN',; :A 9* Pearland Parkway waterline from 5hadycrest to Dixie Farm Road 1 I raiNwiay auyuc >i Lu ulAic r iu, P,ujc..L uv,,, um constructed in conjunction with the road extension project. I oot'ioss I au :,u, nuLci awuik-c c„L, area. Assume all survey and ROW funding from road project. 4E390021 �p omIRFMN$ !Certificates of obligation 'Future GO Bonds spuoa anuanaa s /MI D03dj !System Revenues Cash 11mpact Fees cash 0$ adeigightl 16'44 UiliiNilI$ 058` ?E$ $49,250 I U11.141010 537x00' 1000`OL$ 1 00T'ZOS$ 1 L I O I 1 000 I 00 0`OL$ I 001'205$ �'g1R li {"I, [MOM l!I'ifiriu@ )58'2£$ I 1 ,1 Ihi 11 11 kl i lk is 1 1 t t' �pm,�;„ywli il 6iJ;W t r 44 N0fl� 011Y [;ii 1 i i44'i aid. 101 Ii1 pi 1 Preliminary Engineering Report !Land /Right of way IDesi gn /Surveying I uo p.Dn,n.suoD (Equipment and Furniture A DUa6ul1 uo D1 !TOTAL COSTS WE ..E4401110: IMO Y ham ;F W111' los los los 1 056'991$ I los 001`28$ los 1 050`t5Z$ los 1 00t'ZOS$ 1 Project Manager: Andrea Brinkley Project's Approval Date: 3/11/20111 os I an vi ESEMP los MOM AMMERNIE 105 u 1 056'891$ 050`TS25 1000'ozys 1 1 Explain Identify Type of other sources: MOM EMETTIEED t''ZT O d Z�G�� I( T j h 0 ci1" I $82,100 mionmvai e 1 O$ 139008 ome$ P$ I o$ t j llaoNdd»gq t jf d�,1,$.4mJ "i2 s`. R i ;iii 4 l; Wddlf'ri id$ 0S6'89T$ I 00t'Z2$ I 050'152$ I 001`205$ I mitallISSE 1 056'891$ I I $82,100 1 I I oot'ioss I !General Revenue Cash !Certificates of obligation 'Future GO Bonds spuoa anuanaa s /MI D03dj !System Revenues Cash 11mpact Fees cash 'Impact Fees Debt l other Funding Sources' 'TOTAL SOURCES U11.141010 537x00' 1 I dr,,;i� 'i H U 2012 2 016 CAPITAL IMPROVEMENT PR OF PEARLAND TEXAS rq CNJ co N rq CNJ co H U HI NI NJ HI 8 LL O r H U q oI,04 ad1 onzAgemo Ye8BMWleMl0333BNO I O$ I O$ OST'S79$ O$ I o$ 1 8£T'972$ 1 o$ I L8Z'T68$ o$ 1,782, Cara Davis ate: 3/11/2011 �,9TOZt't r"U Sr WNW. gl k i giti fli 0 it I S II: mown mumcC MMWOMWAgg OST'S79$ 0ST'St9$ 00£'06Z'T$ 8£T'9tZ$ L£T'9tZ$ $492,275 I MOM SAW ViiWgiPMHP mm':letMiuili'ti" 0 w La,tml 1 Explain Identify Type of other Sources: 14 gmmopAin 0 [40944 v' pj l�� u"^3mcgii0.Te!1!I h!k Od 0ST'St9$ 8£T'9tZ$ LSZ'T68$ I SLS'Z9L'T$ I "ppt4sg 4i i `jit Ir�vlflr lk4' m "1 I 4 vim. l! 05V579$ 18£T'9V2$ LSZ'T68$ $1,782,575 I 'General Revenue Cash 'Certificates of Obligation Future GO Bonds w/s Revenue Bonds 7 O 3 d 'system Revenues cash 1{SE] S 1DEdWII 'Impact Fees Debt other Funding sources ITOTAL SOURCES 410006 [eihittlift 378005 gr r {I IN 1 F UN IN ;I ""II'Sa aiii'1"""r il� ,iP d Jo5; 0) 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS 4L TA'd` i!VO 1 iEaANOR u4 a a3aap PNAg3,aa1 9TOZ Nte010$ (o$ os los O0L'984: O0L'98b75 los l o$ L004'£L6$ 000 bS$ 7 V101t 3 MO I tr M 7 My{�a� r g is g 1 000`05$ 1 000'18$ 000'5L9$ los 1 0o4'£TT$ $973,400 STOZ MOM 0$ los I "WWII SUS 0 I bTOZ 11j5'SSOJ,7;3? los I zs��bTOZ �'R: 0$ FWAgg'41 itagalaail 1559`92E'. 1 559`98£! 1 0T£'£LL$ los I I £TOZ )Ntr'N3 LNI,V}Yij =i`>izZN ti??w'I#iiHRiti'g0l?iil"n O$ 1 540`001! [EEEE maema`":SNOIFGti 000` Explain Identify Type of other Sources: I OTE'86$ $773,310 1 u £O£TVM s �LG'Rr�`iM kti! �MNv._ IlA���bli?it _I1I4':.::d #t ZTOZ NVQ,PNIlV 32 JO 0$ 000`45$ IliNaTOOM Meath Iaaoolaatead3L I 000'os$ 1 000'18$ 1060`ST1 1 0so'ooz$ Expenditures Personnel services SBLaddns sab:iey0 saJSAaas (Capital outlay LUO FTE Staff Total M:4 ,,fi� nn a3CO,Nd$a! T1TPAIRH�a„tfv� IR U 4 V 81t.g.11 1 70P408n; 1 pa301ti10 d_ los I I gTOZ14b!: 4 gatiNNORWR los aoaaava a 3 j! fiP,'itia'-;`'E4M1 jI'"'uNl ml O (+9 PR07 tliggi Eiit rl'4,.IiE d a,v tEMB I n b Ew..I,nPnigi.I i.l`, 1 Ws` S,i.,ti. MMI Pia CR 94 waterline OJECT iRU 7 'i {iR'i'! {StU Vhf.AlMl {IF h:MOO MMONSU fi�4h�a ig ll at Insta approximely 5,300 feet of 12" waterline from Hughes Ranch RJ /CR 403 to just north of FM 518 /Broadway. rlr 1 14 {I 04111tllli iEr! 1iN 1 MllnI SIG 01f ixi1E 1 0OL'984$ 1 004'£[6$ 1 di3 1 010 0 10$ RWMAlp a �tN 6 RLia3j hi P.LAPPROP 7 {('�u. I OOL'98t! r 1 1 000 1 1 8$ 1 1 000' sL 9$ 1004`£TT$ I 004'£[6$ Klk iT(iiiiir"iCdW id lliiiTM 001.01 f tOTALPBUUG $54,0 1 000'oss 1 1 000'12$ 1 000'SL9$ 1 7 c 3 d' 1 004'£TT$ I 0017`£[6' papung.unl (Other Funding sources' ILand /Right of way 'Design /Surveying 'Construction 'Equipment and Furniture 'contingency 'TOTAL COSTS jl TI iMi11MS15NOIlb ,JT!J,.4ERA?#'P 1 IIC h..,n7 0$ !i, e IJi. 'aj':}l{rl:l +?!"W;l, *.`GT,JIik!`:00 1 os (o$ os los O0L'984: O0L'98b75 l o$ l o$ L004'£L6$ Project Manager: TBD Project's Approval Date: 3/11/20111 x los I "WWII SUS los I zs��bTOZ �'R: 1559`92E'. 1 559`98£! 1 0T£'£LL$ =i`>izZN ti??w'I#iiHRiti'g0l?iil"n 1 540`001! I SV0'00L' 1060'o0Z$ Explain Identify Type of other Sources: IRTA ittrd SisfilgiNf I o$ los T1TPAIRH�a„tfv� IR U 4 V 81t.g.11 1 70P408n; 1 pa301ti10 d_ los aoaaava a 3 j! fiP,'itia'-;`'E4M1 jI'"'uNl ml OOL`984$ 1 0OL'984$ 1 004'£[6$ 1 di3 1 010 0 100L'92t' I OOL'98t! 100b'£L6$ 'certificates of obligation 'Future GO Bonds Iw /s Revenue Bonds 1 7 c 3 d' 'System Revenues cash 9SBp spoE ;aedwIl papung.unl (Other Funding sources' ITOTAL SOURCES I' i +4 I E 1i ijFUNDI�JG` r H U 0 00 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND TEXAS 404034440 i ry A los lo los los lo 8SO'60S$ los l o$ lo 850`605$ Project Manager: TBD Project's Approval Date: 3/11/20111 PANNOP44421 toomminowago los S1:OZl I WASS ai!Hli tRiHH'c ?alSktM los .H4 KOZ�ii R ka ift} i 1 850`605$ 1 8S0'605$ IMMOMMS Eitilflififitgitqg I O$ I 1 Explain Identify Type of other sources: 81 faziroamli 1 0S I t`i ithflowaynow los 13DY1f ughY4j „:i1i4H;im 0 w NOWIXOTRIR pouf M (rM V J4(H!lliil:!jHi 850`605$ 1 8S0'60S$ PEP Posl MighviolP IrH;Hi;igNSiRHI': W$ 0'605$ l 1 850'605$ 1 'General Revenue cash 'certificates of obligation 'Future Go sends J lw /s Revenue Bonds 'System Revenues cash 'Impact Fees pepun}unl other Funding sources (TOTAL SOURCES �W3EkI E C late!1 v41;phElh�S�'t0kk} I or P i k i) 11 1 till nitilyr! fit h I d k 4i l'� ij i I! ,fi r H U 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS H H V N CO u H H V N CO o$ it* ,rOI O pia 4s I o' 1 0 1 SbS'£SS$ 1 os 1 £Z6'9LT' 1 17Z6'9LT: 1 bbS'£SS' o$ 1 9E6'091/'T$ Project Manager: Cara Davis Project's Approval Date: 3/11/20111 4BTO 1 StS'£SS$ 1 bbS'£SS$ 1 620'LOT'T$ NMI 1 £Z6'9/T3 1 bZ6'9LT4 1 Lb8'£SE$ H 74 4 1 a s I 10$ Explain Identify Type of other Sources: I o$ r ,TT9Z �9Nl a,; I o$ M90P 4�43aNfI�.i�'. oi„mma m los I �dOliddtll J' I SbS'£SS$ I £Z6'9LT$ I bZ6'9LT$ bbS'£SS$ 19E6'0917'1$ I �t d I'Irla"�lp A2arw ni 1 SbS'£SS$ 1 £Z6'9LTf 1 bZ6'9LT3 bbS'ESSS 1 9£6'094'1$ I s I 6 I 'certificates of obligation L_ spuos o9 anuns' Jw /s Revenue Bonds 1 'D' 'system Revenues cash !Impact Fees cash 'Impact Fees Debt other Funding sources' 'TOTAL SOURCES wagpm y'ip S �'SO 'Rtl U CO 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, co co I II I I co co I I co co EL 1611 i1+rt ;keL'lti ttfl wl^ t`,.`;li{� irk!` RV42tOFit!3ITMVOE ISIMMOMMS 9TOZ los 1 o s lo fT8'tt91 1 802'1911 IO$ lo 6Z9'62Z'T$ I VailiSta iwirciaaon hilli'ln 'r(t'�k'(iP ikn?, ow 1 O$ I L6t' 1 6TT'9tEf ZSt'092! los T£5'S0T$ 1 6Z9'62Z'T$ O$ d 9TOZ 1 £T0'996$ Mat 1 28t'098$ 1 1 T£S'S0T$ 1 £10'996$ I RMUMUMW STOZ 1 908'191 1 802'1915 0410 'JN:JN3Y't tTOZ WW I ;j1°19i Ii!t aththailW mIsmitem 0$ Cti'( x 51 0 N r fi�R�{�Tddr..rP OWPOMMSO 1 L6t'LLT`- 1 6TT'9tt1 1 919'£Z£$ 1 6 I 6 I IYYY,I CINRVPI £TOZ 0$ }3 �F tiTiOZd4 'VO. 1 os 1 Explain Identify Type of other Sources: O$ t tOSTVM +tt, {a $+19 tI:int,ir +rr R t t iii 133 COa& OINNPOSi ZTOZ 0$ 1 os a ff l yy e' I i5 1 1 „tndillrtifnli: fiKliiyciW 1 0 r S1i hIfi E k IE; r k. r.;t l Expenditures Personnel services saLLddnS services charges Capital outlay 1E201 FTE staff Total 'ZTO ta T} fa3lolr a 10$ 0$ i g-Vw.I s g gKM Rr}t{�Pij1�K`h+R:K{ 1 tT8'tt9! 1 802'191`. los 1 1 6Z9'68Z'T$ 1 IPRO7£CT.7o§tt FSOAT Oftw ell'E_IL'! isAf Cat: fSOMIiJNti ttaiISaMM MiR AMI IA This will supply to the city limits and ET7 south of Bailey Rd. for future development based on 2007 water Model update for 2015 demand and is developer driven. 16 Fi ia3aNn� i KOWNOM 13 0? eal rIG I� 1lit�P� t lti`�� f1�i1tIF!" J r fiiit +44 r;5+ l(!t J@ los 1 808'191`. L00'£St` 1 L6t'LLTI r6TT'9tf9 ZSb'098 6 1 TES'SOT$ 1 16Z9'692'T$ 1 w 1 1±11"h !tiN Wig @!i;iWP": !Future GO Bonds Iw /s Revenue Bonds 1 6 1 W 'Impact Fees Cash 1 L6t'LLT$ 1 1 6TT'9Vt$ 1 1 Zst'098$ 1 1 T£S'SOTS 1 1 629'68Z'T$ 1 30Np4�09{�" `41 ROWINsi O!dl 4RIAM i +A tgxtM+ RM I. to Ca 128 16" Water! PRtiltdT615ESCRIPttOWWW'H iif To install approximately 5,300 feet o Dr. from Bailey Rd, south to CR 100 feet with a 12 -inch line from CR 100 tt "Preliminary Engineering Report (Land /Rightof way (Design /Surveying !Construction 'Equipment and Furniture 'Contingency ITOTAL COSTS L 8 t VO O ttb 1 4f�11�; �.4R N" i I ti4ai �C�O'd fr��l�i{ 0 1 i1t:�IIII` i 1 NIESIRKSTitgalt lo 1 los los 1 o s lo fT8'tt91 1 802'1911 I Loo'£8t1 lo 6Z9'62Z'T$ I Project manager: Cara Davis 1 Project's Approval Date: 3/11/20111 1 900'£St$ 1 L00'£8t$ 1 £T0'996$ Mat 1 908'191 1 802'1915 1 9T9'£Z£$ WW I ;j1°19i Ii!t aththailW mIsmitem 1 os 1 os 1 Explain Identify Type of other Sources: dr i, lt tr r W R MS14 4REik,'! 1 os a ff l yy e' I i5 1 1 „tndillrtifnli: fiKliiyciW 1 o$ n i 1 99afnff Ri11 ,y a3"aryn37ll fiithdE'F..,int+;R iRFO 10$ u gWP ii 'S I R U& :OfirMUil'b is'L r010fii'. 1 tT8'tt9! 1 802'191`. 1 L00'£8t! 1 6Z9'68Z'T$ 1 6 1 6 1 13 0? eal rIG I� 1lit�P� t lti`�� f1�i1tIF!" J r fiiit +44 r;5+ l(!t J@ 1 tTS'tt9! 1 808'191`. L00'£St` 1 6Z9'62Z'T$ 1 6 6 General Revenue Cash 1 !certificates of obligation 1 !Future GO Bonds Iw /s Revenue Bonds 1 •D03d1 'System Revenues Cash 'Impact Fees Cash [Impact Fees Debt !other Funding sources' ITOTAL SOURCES n 41 S� plv 00 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS O$ 1 &7p 0160 o s os ZSL'£Tb$ os MT! Z9 68S'Z9! T8L'ETb$ I o s 1 TbL'ZS6$ Project Manager: Andrea Brinkley Project's Approval Date: 3/11/2017 saj !.+'&fRDI^wl. isn't«,^ {n, 1 ZSL'£Tb$ T8L'£Tb$ 1 £9S'LZ8$ �0 -�1 groffoggrommam 1 68S'Z9! 68S 8LT'SZT. 6 0$ I 0$11 mat 1 o Explain Identify Type of other sources: rq o$ mUtiggRff 03VklT1531 1 os AMPAINI 1 Z2L'£Tb$ 1 68S'Z9! 68S'391 1 T8L'£Tb$ 1 $952,741 WATIIPOwe PAOMMMMgRili g i W lol vow* 1 ZSL'£Tb$ 168S'Z9$ 1 68S'Z9S 1 T8L'ETb$ 1 TlL'ZS6$ 4 h re ,O {j s an4 sg 'certificates of Obligation 1Future GO Bonds IW /s Revenue Bonds 'system Revenues cash 'Impact Fees Cash 'Impact Fees Debt l ather Funding sources' 'TOTAL SOURCES co co CITY OF PEARLAND, TEXAS 2012 2016 CAPITAL IMPROVEMENT PROGRAM oo oo IMMela 3,380,000 2,007,802 3,860,000 10,125,104 155,000 703,000 £8L`L09 3,078,083 906'£91. bb8'L9 232,900 122,341 255,024 98£`36P'9 90L'ZOZ'LL I- 6Z`620'Z 9Z6'Z£L 1,350,000 400,000 47,053,497 WSW "Y9LOZW Zb6'891.7 L 19'991'9 I 01.17'66t6 9l8`LZ9'L 519,800' 000'006 400,000 23,074,579 WrSj.OZ 1 Z176'991..17 481,238 LLZ`LZZ'Z 323,774 963`£06' 4 411,475 2ZL'£lZ 450,000 0L0`691'0L gl iT 1,307,220 92,778 369,287 130,383 232,900 122,341 255,024 ££6`609`3 N I f k 0 d'` f n;i. 366`99 588,000 L9 L'LZ 481,579 £39'99 17178'1•91• so Vs R 3,380 2,007,802 3,860,000 500,000 18,008 115,000 068`089`6 IM ONO n iil'I,,F[,bo BCti 42INQ{f„lNN i 1 r,nf$jYfl{I Barry Rose WWTP Rehabilitation WWM Project 7 Twin Creek Regional SCADA Lift Station Basin Rehab WWM Project 2 Hatfield Basin Trunk Sewer Line WWM Project 31A Southdown (North Central) WWTP Expansion WWM Project 19 Broadway Trunk Sewer Extension Walnut Lift Station WWM Project 33 Orange Mykawa Lift Station Retirement WWM Project 5 Mykawa/Scott SCADA Lift Station IWWM Project 17 West Oaks Lift Station Retirement Eliminate Somersetshire Lift Station WWM Project21 Oak Brook Estates Lift Station WWM Project 8 West Lea Force Main Pearland Heights Lift Station MAW Project 11 Veterans Drive Lift Station Service Area McHard Rd Trunk Sewer (Mykawa to Southdown W WTP) WWM Project 12 Roy /Max /Garden Roads Basin Sewage System WWM Project 22 Miller Ranch Rd. SCADA Lift Station Barry Rose WWTP Plant Expansion WWM Project 29A -JHEC WWTP Expansion TOTAL 1700 LMM aaroi' H o N itt'Nr OI IMM £0 L LMM 1 031 -W ZOZLMM £0Z LMM 1.09 LM Z02LMM 170£ WW1 £0£ lMM i 1 LObLMM LOP LMM ZOP I MM 1091MM 1 309 LM £0911\ 1709 LAMA 909 •MM 1.09 WW1 2 0 CO OD re a. 0 al 04 C W O c0 CD [T[[[[ REFERENCE NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 i b r PROJECT NAME Walnut Lift Station Barry Rose WWTP Rehabilitation WWM Project 2 Hatfield Basin Trunk Sewer Line WWM Project 7 Twin Creek Regional SCADA Lift Station & Basin Rehab Eliminate Somersetshire Lift Station WWM Project 33 Orange Mykawa Lift Station Retirement WWM Project 5 Mykawa/Scott SCADA Lift Station WWM Project 8 West Lea Force Main WWM Project 17 West Oaks Lift Station Retirement WWM Project 31A- Southdown (North Central) WWTP Expansion WWM Project 19 - Broadway Trunk Sewer Extension Pearland Heights Lift Station WWM Project 11 Veterans Drive Lift Station Service Area McHard Rd Trunk Sewer (Mykawa to Southdown WWTP) WWM Project 12 Roy/Max/Garden Roads Basin Sewage System WWM Project 22 - Miller Ranch Rd. SCADA Lift Station WWM Project 29A- JHEC WWTP Expansion WWM Project 21 Oak Brook Estates Lift Station Barry Rose WWTP Plant Expansion BARRY ROSE WVVTP REHABILITATION, 2012 PEARLAND HEIGHTS LIFT STATION, 2014 WEST LEA FORCE MAIN, 2014 WEST OAKS LIFT STATION RETIREMENT 2013-2014 EUMINATE SCMERSETSHIRE LIFT STATION, 2013 ORANGE MYKAWA LIFT STATION RETIREMENT, 2013-2015 BARRY ROSE WWTP PLANT EXPANSION, 2015-2016 NEI r � YEAR OF FUNDING 2012-2013 2012 2012 2012 2013 2013-2015 2013-2015 2014 2013-2014 2012, 2014-2016 2012-2013 2014 2015-2016 2015-2016 2015-2016 2015-2016 2016 2014 2015-2016 TWIN CREEK REGI ONAL SCADA LIFT STATION AND BASIN, 2012 MYKAWAAT SCOTT SCADA LIFT STATION, 2013-2015 SDUTHDOWN NC WWTP EXPANSION,2012, 2014-2016 JHEC WWTP EXPANSION, 2016 WWM PROJECT 21 OAK BROOK ESTATES LIFT STATION, 2014 WALNUT LIFT STATION, 2012-2013 BROADWAY TRUNK SEWER EXTENSION, 2012-2013 a MC HARD RD TRUNK SEWER MYKAWATO SOUTHDOVVN WWTP, 2015-2016 OW ROY MAX GARDEN RDS BASIN SEWAGE SYSTEM, 2015-2016 al VETERANS DR LIFT STATION SERVICE AREA, 2015-2016 al HATFIELD BASIN TRUNK SEWER LINE, 2012 VWVM PROJECT MILLER RANCH RD SCADA LIFT STATION, 2015-2016 2 Miles This product is for informational purposes and may not have been prepared for or be suitable for legal, engineering, or surveying purposes. It does not represent an on -the -ground survey and represents only the approximate relative location of property boundaries. O$ nalirat UggilraignMMWMWA 105 $3,000,000 1 1 0$ 09L'£SL$ L L 1 1 09L'£SL'£$ Project Manager: Skipper Jones 1 Project's Approval Date: 3/11/20111 0 1 os r o$ r14TOZ el wham 1 o$ !P1 1i 1 os I Explain Identify Type of other Sources: Project Management of $45,000 provided by city staff. Not in numbers. 1 000'000'E$ 1 000'02E5 1 000'08£'£$ y d' ,i Zt L OZk h 010 iltloioo'Hhi �`}LZ07,�" T JAP G aywxls3A sigsmoggotoutal $373,760 $373,760 I n E 139009e owimmmost $373,760 I 1 09L'£L£$ �;'�*e'oxaau logrmao 1 $3,000,000 09L'ESL$ 1 1 09L'£5L'£$ 1 i13 ?unary ,1�:; W I $3,000,000 1 $753,760 09L'£SL'£$ 1 'certificates of obligation 'Future GO Bonds 'Ws Revenue Bonds D G •3 di 'System Revenues cash 'Impact Fees Cash impact Fees Debt l other Funding sources' (TOTAL SOURCES I t t 11 k y �II [NGi C �s� H 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS H H U N CD o o www w Ti H H U N CD ran* AWM04 litttsMt-S5'5, los I 0$ 10 I o$ f OS Icy I 00 0 1 v5$ 1 25 1 000'4E9'48 Project manager: Andrea Brinkley Project's Approval pate: 3/11/2011 )0'008'28 p all fsp a 101*** aligal5a2 'BMW WIllaSea miasmata I os 000 000'17$9'VS 11 NOMA= 5102 los fillaA ikagfilal 88815MWIPM598Y8808 (S105,000) (000's2s) (000'0818) ppri WaSSMN145 los rosmoMmm Fspftlissigmisfi Misiingffig! !V...s.ANKOSSISk5St 1 05 06 tTOZ I os km- los 1 (000'0815) l I I Explain Identify Type of Other Sources: Fund 67 Fund Balance. Project management of $38,000 provided by City staff. Not in numbers. new WMIROMMW 0815888e58888885 (000'soss) (5 375,000)1 000'008'78 000'095'T$ $3,860,000 1 llaS r554410AISNWS5Pw (00 0'08vs) r op Mgaimsro 50T1Mm aaagaaaaaNifia4PAEPW Sa lop 000'v[25 $774,000 aaPPROOF Mesa sstm011osmMistasia 000's 1 000't Mani caosaa la I 05 I 00 0'006 1 Z$ 000'1788 I 000'1789 Personnel Services sajiddns 7 pac9 9 PiNwill WOW& a$MaaSAW85$3 Capital Outlay 1E10i. FTE staff Total 000'008 I 000'VECZ$ 000 mogn 'General Revenue Cash :izt:11 Obligation L W/S Revenue Bonds P.F.o.C. System Revenues Cash Impact Fees papunTunl Other Funding sources 'TOTAL SOURCES ran ONO l000'tus I ROMMUNOW altoolimpat SIM4Poss4 TIF5UggisTgagiTMTWAT Malaga 910? 1 (000'50 5$) 1(000'sis) 1(000'08IS) p all fsp a 101*** aligal5a2 005'8085 I 005'60253 I 000'ELE'E5 000'661S I os 000 000'17$9'VS 11 NOMA= 5102 (S105,000) (000's2s) (000'0818) ppri WaSSMN145 1 05 06 tTOZ (000'50T$) (000 km- los 1 (000'0815) iSsroz$104 Ste isalfftlEe ET02 (000'soss) (5 375,000)1 los (00 0'08vs) r op Mgaimsro 50T1Mm aaagaaaaaNifia4PAEPW Sa lop zioz la I 05 00MailleatiaMaSHOMOI Expenditures Personnel Services sajiddns Services Charges Capital Outlay 1E10i. FTE staff Total 000 I 000 1 000'098'ES Plf4; 1 10AtO 11 TIKAWAti MaNSIRMOMPS 005'101$ 005'602$ (000'8E0 0006678 l000'tus I s*ataaMaaaa4O5MMBWTMalaaaaEasMWHNaaa4aaaaaasPE WIAM Project 2 Hatfield Basin Trunk Sewer Line Broadway Street to Hatfield Lift Station #2 and an additional 8,200 feet of 12" line connecting to the trunk main. reducing I/I work to the Walnut Litt Station and reducing the tuture Walnut LS size by 1/3. It will also intercept the high flow due to I/I from the Corrigan subdivision. *0 504400MWMOSS $209,500 $303,500 $299,000 ($38,000) l000'vil$ 1 209,500 303,500 000'ELE 000'66Z! 0006W 000'bE9'178 14i63 56MITAVIOgs alTWAMM$0010114 $709,500 $303,500 $299,000 1 $3,373,000 1_000 1 000'4E9'14 1 Preliminary Engineering Report Land/Right of way I -1 21 7 1 11-ing 'Equipment and Furniture 'contingency 'TOTAL COSTS 0$14 014004644m 0 z 5 a. D. ett LLD rei CO CITY OF PEARLAND, TEXAS 'r r. liO `is u W?'t,.fix. linORUAM `k Sea 4aap8b+r.��y3aa33 9T0Z -t11a 0111: .1rk`% 1 0$ 00S'L6S'SS !as $500,000 $1,027,604 o 1 tOT'SZT'OT$ 1 IO$ Project's Approval Date: 3/11/20111 5�7 tiollontaAo S St!xk a? n ammo o$ 000'oos$ 11,307,220 i7,167,884 1 os 1 000'051'1$ 1 b0T'S ZT'OT$J WW1 SWAM Sege S;jiHa!:^vi6 V11N w 0$ Zb6'SST'tS 1V6'£SS'E$ 1 Zb6'RST'17$ 000'5[5$ Z46'SST'b$ STOZ 1111111114PRWM1 b09'LZ0'T$ 0ZZ'LO£'T$ 0 O s ;pa Ma!aN±aINik� 11111 Zb6'£SS'£$ 000 '5[5$ .I 1 Z176'SST'17$ 4TOZ SISOD4JDNVN31 Explain Identify Type of Other Sources: SASS mamoommi sI O S WsNonvnrdo3Ia 0zZ'LO£'TS wnmiu4444r. l�L�N^.+ 1 ozZ'LOE'T$ 1 ETOZ NItlNiONW I o$ i3P, �an, a l; eb 3ijij3n ll 08 'l `d ,Rdam"fN,„tr7 n3N n,l,ua;#4}EOtid,I TOZTMMI ZTOZ 0dork+! 0 OMMOo mom �lN Ivfia3MCON'dN s59.?k' 000'00SS b09'LZ0'T$ 000'00S$ 1 bot'SZV OT$ 1 10$ 1 000'ooss I Expenditures 'Personnel Services say Lddns (services Charges iSe L1nO Le10e) 510,125,104 L E7 o 1 PTE Staff Total 1 NT a3npM i Mks; $:St1'liiWt" tip 0 !System Revenues Cash Impact F ees Cash Impact F ees Debt 'Other Funding Sources' I (TOTAL SOURCES 10$ I41!'i 1.,<1e. 111 BxlJkN nlIRMAfgWOM1161111 1155Ij."DiMO„,:M_i.U,)W'MJ,k:aalw N,f1 I WWM Project 31A Southdown (North Central) WWTP Expansion QR03ECTi1 D,E'5Pai PIO17,4 ti}��il il1Ei ii ���l l #ild��d"_2iti V'i, ik�itr�AE�: (`�k) i 4 if,>f i fi 2 _____mina t_5 A Preliminary Engineering g Report (PER) wilt b2 COmpl eted t0 evaluate the alternative of a 1 MOD WWTP plant expansion or diversion of flows to the Far Northwest WWTP. A design /construction project scope will be finalized once the PER has been completed. IiiiM }Ara ulFftltM :LLFMMlftS ismil}N(iP 1m 17 sspiol auto LaPaLiLy. wi,., piuja,Lcu yivaL: iu u:u aica, a i ri c,Paiu:uu ,.nyn,.:iy is planned. a.'39anai 34NM U'..1P,iGh":'rytai 0$ 1 'l4'ikl" 'wN w It p,lr i47!:t itiit 000'00S$ b88'L91'L5 0ZZ'LOE'T1 1000'0S1'15 1 I $10,125,104 I 000'005$ ;1,307,220 1 ;7,167,884 1 000'051'1$ 1 170T'SZ1'OT$ 1 anai`G tspig VR Preliminar Egineering Report Land /Right y of n way Design /Surveying Construction !Equipment and Furniture !Contingency qi ij1 1 h, lN vu. Rot Off' ^!t L DO 17:1, �u� Ita gi .7k1�ti3ituu N� �I4 II71 hl l i I ONI4s y. N B I X34 0 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS O$ O 1 0$ 00S'L6S'SS !as $500,000 $1,027,604 o 1 tOT'SZT'OT$ 1 Project Manager: Teresa Battenfield, P.E. Project's Approval Date: 3/11/20111 5�7 tiollontaAo S St!xk a? 'w1, "I momisammmm Zb6'SST'17$_ Z176'95T'17$ SWAM Sege S;jiHa!:^vi6 V11N w Zb6'SST'tS 1 Zb6'RST'17$ t swim momsommom 919'67Z$ b09'LZ0'T$ 0ZZ'LO£'T$ I os Explain Identify Type of Other Sources: SASS mamoommi 000'0055 1 000' I wnmiu4444r. l�L�N^.+ I o$ i3P, �an, a l; eb 3ijij3n ll 0 o0s'L6s'SS I b09'LZ0'T$ 000'00S$ 1 bot'SZV OT$ 1 mpiART blibm 4 n i j011 $114399T9 SMI giiigba 'tL A tN j!NNi }}j1anN�1F llitd'iBP,?SOP o0S'L65'S$ $500,000 $1,027,604 510,125,104 Certificates of Obligation Future GO Bonds W/s Revenue Bonds PE.D.C. !System Revenues Cash Impact F ees Cash Impact F ees Debt 'Other Funding Sources' I (TOTAL SOURCES i, P i 1 1 2 h h, l r 11 1" a l t w IL I1 AFUNOING sOURCES�ij .I�l1 15 J{ k11} 4 111 h e �i1h' iu1i11142m1 0 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS 0) H U CO CM I h .4t 9 P'�" „?4y�d1�sH 5;,11�,.fh1 asaad?3�N a3�3aa] r VIORMOMPO 9T0Z o$ 1 05 ($17,500)1 I o I o$ 1(00S'LT$) 1 £8T't095 mm1f tllO.% MONIMOS 111111000$101100 1 L9T'LZ$ 1 896'£S$ 1 012 85$ 1 tzo'ub$ I o 1 VTZ'85$ 1 28T'109$ POOMMKO STOZ (005'LLS) I(000`SL$) (o0S'Z65) $$JJ m1RmNN33iit Wi IM rz;:513 -�n' O$ 1 os $15 vTOZ 05 MIST eZ' N OF 0 "16111 1 b Z0' Z b$ I $58,214 $481,238 I 5T0Z £Z'1Sb$ 0$ PAP gRgIg 1 896'£S1 1 012'8£1 $92,778 18LL'Z6$ .it: 1 8LL Z6$ I scippl MOM It"M h S IM IMM U 17 TO£TMM tioN tisOnaoPl ZTOZ 1 L9T'LZ$ I 05 1 L9T'LZ$ $27,167 I 6FdZ" 4511MO '!n I W{' a 1{m tl e Expenditures Personnel Services saLLd sabueg7 9 sauLua5 Capital outlay LEla1 FTE staff Total i Explain Identify Type of other sources: 97 i ITOZ10 tiibaal wri` 11 1 o$ I U TT,OZt�naliF �031vWI.L I o$ I o$ I im2, PY :,:,i' "1 'IM :l Wi ldil'¢i1 S 1F g#1,044lt1riliffei��ilta ui. s 1.D9CObdi wwM Project 33 orange Mykawa Lift station Retirement WJE,4T04.ciIPTIONrM itijyOMM}hn Ii ,i3"0}h(iRA+t !4ew0i 3,11 101000$1 10 Abandonment of lift station and installation of new 12 -inch gravity sewer line along Mykawa from orange to Walnut for approximately 3,386 feet. To be completed in coordination with Mykawa Road construction. a major rehabilitation within the next five years. The project will also eliminate an inverted siphon gravity line and remove the existing lines from being in conflict with the drainage for the Mykawa Road project. fltaard' I, K6; Ale 10$ aoliddv B%QID6 miNAMi "idlpW11.'Mil6'tl 1 L9T'LZ$ 1 896'£S$ 1 $38,810 b 1 tTZ`85$ I 1 £ST'1095 I MONOWO MAMMON. f'ON 1 L9T'LZ$ I 1 996'ES' 1 Oi8 8£! 1 bnesss 1 1 £81'109$ 1 'certificates of obligation 'Future GO Bonds 'Land /Right of way 'Design/surveying__ 'Construction 1 !Equipment and Furniture 1 louebuLluoJI 'TOTAL COSTS 11� qirk bait iiitsvo ril,u!RA!} i,>.Iif,4 L1 'General Revenue Casl YOPATOA 'Preliminary Engineering Rep Imams oliko ip 310111 ifi gg,,r�� i�} p 3ifOa m Sn�1 IM Ma n Iola mAt<";', Ammmuumm o 1 os 1 0$ o$ 1 05 £$1'109$ I o I o$ o$ 1 £8T't095 MaTAMMO O$ Skipper J ite: +e STO wo-; MOM $4100110019411 £Z'1Sb$ 3£Z`T8b$ I A g ,h7 iryltiARIR ii?ik;i ua4!''... $92,778 1 8LL Z6$ I scippl MOM 1 L9T'LZS 1 L9T'LZ$ I O$ i Explain Identify Type of other sources: 97 i ITOZ10 tiibaal wri` 11 I o$ I o$ 139008" RCIatiqd COMM I, K6; Ale £$1'109$ 1 1 £81`109$ 11115 'ipas 1 £81'109$ 1 £21'1095 1 k... I }I}�vi�tr3{ii 'certificates of obligation 'Future GO Bonds IW /S Revenue Bonds 'system Revenues cash 1 saa9 loodmiI papun4unl 'Other Funding sources 'TOTAL SOURCES iiitsvo ril,u!RA!} i,>.Iif,4 L1 'General Revenue Casl 7igT; t 411 Imams oliko U 201.2 2016 CAPITAL IMPROVEMENT PROG OF PEARLAND TEXAS II fJ 0 op "ei» los lo lo lo o$ 906'E9i$ ITR los 906'E9i$ Project Manager: Public works 1 Project's Approval Date: 3/11/20111 PratO:ZIi t t'Rhb�h. 0 I o$ TI `tix�i o $130,383 I E8£ b£i$ I $33,523 I I EZ5'£E$ 1 Explain identify Type of Other Sources: Public works will be doing construction. VIM !se7N.'F,GHM$P: los I LEST�IMATiEDrg $0i61101* I o$ hltda r iWinjg;hair 906'£9T$ 1 1906'£9i$ I 1 906`£9TS 1 906' €9T$ I Flimoolf hitogisiofi 'General Revenue Cash 'Certificates of obligation 'Future GO Bonds Iw /s Revenue Bonds 'system Revenues cash seed 1JEdeT' 'unfunded Other Funding Sources' 'TOTAL SOURCES 1} q ii ik a li 8 a. 2012 2016 CAPITAL IMPROVEMENT PROGRAM 1 3 fa ƒ IN NJ G 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS j (000' s$) L 10 I tLb'90TS 10 1 in $232,900 I Project Manager: Teresa Battenfield, P.E. }project's Approval Pate: 3/11/20111 1006'Z£Z$ I $'9ZTf p1^ 3677077x8; atom 0000' Matins smilymiipm I o$ MOM& AI* St rridit Mew os imitosii I o$ 9Zb'9ZL 1 4Lb'90T: 0 006'Z£Z$ Wag Ei- SNO3lkZP2ldt 1 00£'OZ: rn _58,000 1 000'0£$ $232,900 I os 1 Explain Identify Type of other Sources: ru Tril A 1 o$ I o$ I iI, %t,OZ, i n8011a t. t�+ 03 Vkil56i�.wtA it,., rn „gw,rars„ Mig[i'h o t ra' k4.'00 Personnel Services saiLddns Services &Charges Capital Outlay FTE Staff Total I Os +!1aPana:! G34 rm. ?a.�rv+=� 191,72 ww lot I 10s o va0aaa R c t r` i�u, R iEf`t6 1 „'IVI r G;v k ti3f In iG j NAME, .kU!i{IiWi�'h +Lip Nt.M N! T, alNi{ IASOu+ BS SN MMi{ 3 H NY#lq,lilq,}4n4r}SiM O ect 21 Oak Brook Estates Lift Station DESCRIPTION i+i`ki i ,6.rti!txf0111SI +i t4'ijON I M4 «ii't_`ej MISSMIN .';Sias 1j! W Ft 40 lent of lift station and installation of new 12 -inch gravity sewer line 19Zb`9ZT'. 1 17Lb'90T`. $232,900 I os NOM awvmmamiim 009'VZf L58,000 000'0£$ 9Zt'9ZT$ I bLb'90T$ VI 1006'Z£Z$ 00£ 009`bZ9 'certificates of obligation__ 'Future GO Bonds 'w /5 Revenue Bonds J 4 3 d' 'System Revenues cash gSEJ Saaj loed1Il papun4un' !other Funding 5ources 'TOTAL SOURCES Ioesign /Surveying 'Construction 'Equipment and Furniture ilia; a T50, trv{m (TOTAL COSTS IN NJ G 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS j (000' s$) oo£'0Zs 009' bz'. 1 10 000'0£$ 1006'Z£Z$ I sTOZ tTAIWatl 0000' os I o$ 0 Wag Ei- SNO3lkZP2ldt 1 00£'OZ: 1 009'1725 _58,000 1 000'0£$ $232,900 1 o$ PRO7ECTakNIMI l ltK{nih WW1401 Expenditures Personnel Services saiLddns Services &Charges Capital Outlay FTE Staff Total lot I NAME, .kU!i{IiWi�'h +Lip Nt.M N! T, alNi{ IASOu+ BS SN MMi{ 3 H NY#lq,lilq,}4n4r}SiM O ect 21 Oak Brook Estates Lift Station DESCRIPTION i+i`ki i ,6.rti!txf0111SI +i t4'ijON I M4 «ii't_`ej MISSMIN .';Sias 1j! W Ft 40 lent of lift station and installation of new 12 -inch gravity sewer line I os 1 00£'OZf 009'VZf L58,000 000'0£$ $232,900 1 VI r�gS qfligfi{iijryjAii {tllkii!i {!!iii 00£ 009`bZ9 [58,000 I 000`0£$ o06'Z£Z$ (Land /Right of Way Ioesign /Surveying 'Construction 'Equipment and Furniture 'Contingency (TOTAL COSTS IN NJ G 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS ZL ggigigagiggaiNgig4WOOURCUNPAPEagNVVW 9T0Z MMEOPEIRMH 1 1 061'4$ 1 6L£'8$ 1 L££'T6$ los 1 69S'Z1$ Tb£'ZZT$ STOZ MOM 105 _O$ Io$ I o$ £TOZ 1 IA'Tj6 ,J5"t:E'' ggg id 2014 2014" 5,866 t 1 061'4$ 16LE'9$ L££'16$ _69$'Z 1 TVE'ZZT$ E0 1MM uf. giNili f 3 igith i.#?5'113GONdl ZTOZ I 1 o$ saun7.wuadx3' hMi M4l "12C' aggifig{LSaW!`:.N 'Personnel Services saLLddnS sa6uey0 9 saDLA.Ias Capital Outlay LflOI FTE Staff Total 0$ 1 0$ PROS EC PgligOi i 'II glainak.!4=:G.aJIgINOi7MU ,:!{F'igl'..NaEgli Mg0"4`P.,graE.uMMA igiii WWM Project 8 West Lea Force Main Luc rvoL mica cLaLluu w feet. 1 POgiggigNiggegaggRURPOMMINgaggiiggagg4MOgg I o$ 061'6$ 6L£'8$ 1 L££'T6$ 69S'ZT$ 1VE'ZZT4 06T'b$ 6L£'8$ 1 I $91,337 69S'ZT$ TVE'ZZT$ I 'Land /Right of Way _0 Design /Surveying (Construction (Equipment and Furniture XDU6u 'TOTAL COSTS v. II1HD I c pad' H H U N 0 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS 8 H m 0 H H U 0 0 P H H U 0 0 ft s uRroad kwi! athi t iYJt IitIN .+3ih?ib ^i;h(if1{11".mig 05 0 o$ L l os 90L'ZOZ'TTS Project Manager: Cara Davis Project's Approval Date: 3/11/20111 6 )L'10Z'TTS $496,660 e1,406,636 68,283,508 $0 a iL r:F M 3513i1r6leftialldi 90L'Z0Z'TTS l pp 01b'66Z'6$ 5T0Z ibSiontiatuattissi RITNEROPTIli O h 0 I 96Z'E06'TS 1 967'E06'15 r TOZ', ?1I 640ZijPs4 V ATNOW I ff�ryryryry F'�Yr r��Ll R l'm�liYm", Pa 0S i u. ROZ•4 WWWWWWW $496,660 51,406,636 96Z'E06'T5 I o 1 Explain Identify Type of Other Sources: MINA MAWS i ilH S ;Hi:l!'it6iti{i+d:N3Plk 0$ Seim S NOI9;VINIaO 0S Im igOZ 5 naH w i 4ViraMMTffillaP o5 I OS f13900$} t 11 r 434N(IJA I o5 I PROT6CTa #cif {i iWaal wvf1502 40 tWAUW GrY,Jn'TMn` ?•;rtll',i,'ll't't Expenditures 'Personnel services $11,202,706 Services charges Capital Outlay je1o1 190L'z0Z'TT$ I aoaadd -.r- MOROSNOW Milµ!11,W1m11W.1'BAi: +1.4glig `130 1!4µ s Iq::i i I 901.'ZOZ 'TT$ "Wag OARMWQRPR 190L'Z0Z'TT5 I 0024 &gi;td;kN,h3s,% PAOJECT;- ..NXMEeI:I;knik a,tClemfa;' mIPi ,..n;,,•.ImA,; "i;I0 j +II MI I, f1_ilu llil o n `'$qt McHard Rd Trunk Sewer (Mykawa to Southdown WWTP) P80JEMWCRIP,TIONIP p t h t f li fl MMUMrva.lMUi; ji ,EMMTIIMM6lIF Sklutll L4; IL L'I ilp4 install, along McHard Rd, approximately 6,587 feet of 24 trunk sewer from Mykawa Rd to O'Day, 2,032 feet of 30" sewer from O'Day to Garden Rd, 6,247 feet of 36" sewer from Garden Rd to Stone Rd and 8,112 feet of 42" sewer from Stone Rd to Southdown WWTP. This project will be completed in coordination with the McHard Road Extension from Cullen to Mykawa. General Revenue Cash certificates of obligation spuo8 09 aJnlndl w/5 Revenue Bonds P.E.D.C. System Revenues Cash Impact Fees papun}unl other Funding Sources 'TOTAL SOURCES I O$ I mmegMA NIC 'PAN i {537NOO t Fj @I i huh ub lhi IM E alh MI. i 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS 10 1 O$ $496,660 e1,406,636 68,283,508 $0 706'STO'T$ 90L'Z0Z'TTS l pp 5T0Z ibSiontiatuattissi RITNEROPTIli 0 I 805'E91'8$ Z06'ST0'TS OTb'66Z'68 V ATNOW I ff�ryryryry F'�Yr r��Ll R l'm�liYm", Pa 05 i u. ROZ•4 WWWWWWW $496,660 51,406,636 96Z'E06'T5 0$ Seim S NOI9;VINIaO o5 05 0s frnitiZTOZW PWNMPrilli iC4?IdiSAd"k,.",LS PROT6CTa #cif {i iWaal wvf1502 40 tWAUW GrY,Jn'TMn` ?•;rtll',i,'ll't't Expenditures 'Personnel services sajLddnS Services charges Capital Outlay je1o1 PTE staff Total 10$ I i F "Wag OARMWQRPR 105 PAOJECT;- ..NXMEeI:I;knik a,tClemfa;' mIPi ,..n;,,•.ImA,; "i;I0 j +II MI I, f1_ilu llil o n `'$qt McHard Rd Trunk Sewer (Mykawa to Southdown WWTP) P80JEMWCRIP,TIONIP p t h t f li fl MMUMrva.lMUi; ji ,EMMTIIMM6lIF Sklutll L4; IL L'I ilp4 install, along McHard Rd, approximately 6,587 feet of 24 trunk sewer from Mykawa Rd to O'Day, 2,032 feet of 30" sewer from O'Day to Garden Rd, 6,247 feet of 36" sewer from Garden Rd to Stone Rd and 8,112 feet of 42" sewer from Stone Rd to Southdown WWTP. This project will be completed in coordination with the McHard Road Extension from Cullen to Mykawa. PROD 0 U Of13O ,t,'1 +'I{#l. ni:l ail,I;d M fi L: milt ME This project will provide gravity sewer and is called for in the wastewater model. Extends Southdown service area to the east, picking up areas not currently served by City system. th3'RUR9 �U'3atir6i IvlledA'`Wgieli'l. I O$ I $496,660-1 ;1,406,636 805'58Z'8! Z06'ST0'T$ I 90L'Z0Z'TTS I j' I riia!!Liu;IjiE'Af! {gIIT: ;L 1 i Ona ,'li;{ bii1t l` h $496,660 $1,406,636 805'E8Z'8$ I.. 106'STO'T5 I 90L'Z0Z'TT$ I NRN ANOft %iliSli!i Preliminary Engineering Report Land /Right of way Design /Surveying Construction Equipment and Furniture 'Contingency TOTAL COSTS h sae NOTtl,+ ':ligM�h!'?"I «ilii, MlNOR4 Nii lh0{ I Itt MDS15ODUD3C0Namµ' V 114w ;(`;IkiMj 1 4 i4.1TL 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS H U CO 0 r N- o H U O 0 r [x MW-, j 44 iii f I M t r l j ,hP[. 3q 0 371J 3d32Id1 O 0 9TOZ 10 0$ 0$ 000'OOb$ O$ l o$ $400,000 31rN'"uk"x�'n1tt7 gii'i. it A ,>etehfil:13`rtt PROJ ECtt� QT AL:e 1 000'004$ 0$ D o$ a 0$ 000'oo -I= z r. V W STOZ $400,000 I WSW SIOISHIPMS lagag Siena iM?{4iM 1 000'004$ 1000'004$ 1 0Nb'N31NI' bTOZ 05 I os I I o$ ti'4iOON'igbN £TOZ I o$ 1 Explain Identify Type of other Sources: Project to carryover to 2017 MHO N0I1VIS10( 1 o$ I lPRO7 ECT #it[ dr{` i i rewYnit iIM it TO9TMMJ I as ZTOZ 0 «9 fi ,petr... A 03aN� ,�J iP.Tdpgi$i"fiiflisMft 1 a$ LM N OMEI o`N Mg M1fl Expenditures Personnel Services saLLddns Services Charges Capital outlay 0 of FTE Staff Total 1 00S'£Zb'TT$ 1 1 0 I o$ um i LotirOZ Q£1HY„i, Sillverfpflilw n s a3�irl�3,f s I 1 ICU I39ana+qmi.exs P1 1l a, I o$ !H N,:_,Flj{ {,h' 4, Z,i .{1i9;�ii>{a wMM iEl, ml OM OM MM M4,i4rUMU 'Obi 3wb' Nktl 401[0.! I WWM Project 29A JHEC WWTP Expansion Hargrove Environmental Center. 1 00S'£Zb'2 Longwood Service Area. LiiaL i, uc .'VC' Lo., L. Lilo Jnc` LHe .�ry it ii �,ii MOM" d '10941 fid l maw s I 1 gsmp enuanaN redaUe91 !Certificates of obligation !Future GO Bonds I as D 0 3 d! 1 000'0ob$ !Impact Fees cash 1 1 1 000'Lb£'OZ$ I !TOTAL SOURCES 1 OOOboY'Z$ I 1000'LbZ'SZ$ I $400,000 $2,000,000 000'Lb£'0Z$ I 1 000'005'Z$ I I $25,247,000 lei'.fi 4,l;::,h1„ti��ii� la "rF'.Pkil =iiifcli'is1 !Preliminary Engineering Report [Land /Rightof way___ Design /Surveying_ !Construction !Equipment and Furniture !Contingency !TOTAL COSTS I'1' i 4 4 r LS VoItb n =i,n'�::lai C110-r��iPISG 4 O 0 o 10 0$ 0$ 000'OOb$ O$ l o$ $400,000 Project Manager: Teresa Battenfield, P.E. Project's Approval Date: 3/11/20111 yN ONS 1 000'ooys $400,000 I WSW SIOISHIPMS 0 44 ay ZI age RTROPMV I os I I o$ 1 Explain Identify Type of other Sources: Project to carryover to 2017 MHO 'll2TAZ Intni I as YTtoz,�D 4 `03ilNIls3 mmonsilwilm 0 «9 fi ,petr... A 03aN� ,�J iP.Tdpgi$i"fiiflisMft 0 of WSW MOWN 40{1i.:14;MiMiSy!i iHM 1 00S'£Zb'TT$ 1 1 0 1 OOS'£Zb'9! 1 $25,247,000 1 s I 1 ICU I39ana+qmi.exs P1 1l a, 1 00S'£Zb'TT$ 1 ;5,400,000 1 1 00S'£Zb'2 1 $25,247,000 1 s I 1 gsmp enuanaN redaUe91 !Certificates of obligation !Future GO Bonds !w /s Revenue Bonds D 0 3 d! !System Revenues Cash !Impact Fees cash !Impact Fees Debt l ather Funding sources' !TOTAL SOURCES jt,;I 'I l{ i l, iij� 1 tf i l h p 9 NIONOdId +ll I f 0 0 r 2012 2016 CAPITAL IMPROVEMENT PROGRAM OF PEARLAND, TEXAS e a 9 0 0 a th bid 2 J G j Z)\ m 7 `g E E 111 0 k j k 0 0 0 x 10, p _i 0 c24 U g g4 g ct v Q vt Lh F" 0 d H 0 U 0 0 .5 0 5 0 m U U d ai o U o cin o O o x Q 0 w b E g O e od c5 1 Q U 9 'u 0 0 E Q 0 a O Q i C4 0 U bq 1- 0 0 w 8 5 0 t E 5 o b4 O o U W� 0 i b w c: •E 1 s. O U N 'd .P 0 4" a a Q a,.5 bn b�° a •tin r f