R2011-047 - 2011-04-25A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AMENDING A UTILITY RELOCATION AGREEMENT ASSOCIATED WITH THE BAILEY ROAD PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amended Utility Relocation Agreement associated with the Bailey Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a Utility Relocation Agreement associated with the Bailey Road Project. PASSED, APPROVED and ADOPTED this the 25 day of April, A.D., 2011. ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY RESOLUTION NO. R2011 -47 TOM REID MAYOR County: Brazoria County Project No.: T08002 CSJ: N/A Road Project Letting Date: September 2011 STANDARD UTILITY AGREEMENT ACTUAL COST CITY Road: Bailey Road From: 1600 feet west of FM 1128 To: Veterans Drive Exhibit "A" Resolution No. R2011 -47 This Agreement by and between the City of Pearland, Texas, "City acting by and through its duly authorized official, and Enterprise Crude Pipeline, LLC, acting by and through its duly authorized representative, "Owner shall be effective on the date of approval and execution by and on behalf of the City. WHEREAS, the City has determined that it is necessary to make certain improvements to Bailey Rd., which said changes are generally described as follows: Widen to 4 lanes WHEREAS, these proposed roadway improvements will necessitate the adjustment, removal, and/or relocation of certain facilities of Owner as indicated in the following statement of work: The scope of this project is to lower and replace approximately 622' of existing 16" Enterprise South Texas Crude Lines, West Columbia to Shaver Junction, Line C90 to accommodate the proposed Bailey Rd. Reconstruction and Storm Sewer Installation Project (352' and Enterprise Line Maintenance (270' in the City of Pearland, Brazoria County, Texas. The proposed pipeline relocation is shown on the attached Drawing No.1 8 254 -920 1. as further described in Exhibit "A" and such work is described in Owner's Estimate (estimated at $453,000), which is attached hereto and made a part hereof as Exhibit "A -1 and which is prepared in form and manner required by 23 CFR 645, Subpart A, and amendments thereto; and WHEREAS, the Owner, has provided sufficient legal authority to the City to establish an interest in properties affected by the abovementioned roadway improvements. Said facilities are located upon such properties as indicated in the statement of work as described in Exhibit "A NOW, THEREFORE, in consideration of the covenants and agreements herein contained, the parties mutually agree as follows: The City will pay for costs incurred in the adjustment or relocation of Owner's facilities to the extent authorized under Title 23, Code of Federal Regulations, Part 645, Subpart A. The City's participation shall consist of Sixty Six Percent (66 of the cost of the adjustment or relocation. The Owner has determined that the method to be used in developing the adjustment or relocation costs shall be as specified for the method checked and described hereinafter: (1) Actual direct and related indirect costs accumulated in accordance with a work order accounting procedure prescribed by the applicable Federal or State regulatory body. Z (2) Actual direct and related indirect costs accumulated in accordance with an established accounting procedure developed by the Owner and approved by the City. Subject to the participation percentage as set out above, the City will, upon satisfactory completion of the adjustment or relocation, and upon receipt of a final billing prepared in the form and manner prescribed by Federal regulations, make payment in the amount of Sixty Six Percent (66%) of the eligible costs as shown in the final billing. The final billing for work completed herein shall be submitted to the City not later than ninety (90) days after completion of the work. Upon receipt of the final billing and conclusion of the audit, the City agrees to pay Owner one hundred (100 of its share of the eligible cost as indicated above. The City shall make payment within 45 days of acceptance of the final billing. Design 1 of 2 D12. Revised 6/08 In the event there is a substantial change for the statement of work contained in Exhibit "A reimbursement is limited to Sixty-Six percent (66 of the amount approved and actually expended pursuant to this agreement and its attached exhibits unless written approval is obtained from the City. All changes shall be documented on the Owner's "as- built" plans supplied to the City. City shall reimburse Owner for any additional cost or expense caused by any unreasonable delays waiting for City's written approval. Upon execution of this agreement by all parties, the City will, by written notice, authorize the Owner to proceed with the necessary adjustment or relocation, and the Owner agrees to prosecute such work diligently in accordance with the Owner's plans. Such plans are attached as Exhibit `B Owner shall provide the City with forty -eight (48) hours written notice prior to proceeding with the adjustment or relocation and agrees to proceed in such a manner that will not result in avoidable delay or interference with the City's roadway construction. Should Owner by its actions cause interference or delay resulting in the imposition of damages to the City by a third party, Owner agrees to be responsible for damages, including attorney's fees, defense of claims and indemnification associated with said damages. Such authorization to proceed shall constitute notice on the part of the City that the relocation has been included in an approved program as an item of right of way acquisition, that a project agreement which includes the work has or will be executed, and that the utility relocation or adjustment will be required by the final approved project agreement and plans. The Owner will retain records of such costs in accordance with the provisions of 23 CFR Part 645, Subpart A. The Parties, by execution of this agreement, not waive any rights to which each party may legally have within the limits of the law. This agreement is subject to cancellation by the City at any time up to the date that work under this agreement has been authorized. City shall reimburse Owner 100% of all cost incurred by Owner up to the date of receipt of Notice of Cancellation. The City Auditor may conduct an audit or investigation of any entity receiving funds from the City directly under this contract or indirectly through a subcontract under this contract. Acceptance of funds directly under this contract or indirectly through a subcontract under this contract acts as acceptance of the authority of the City Auditor, to conduct an audit or investigation in connection with those funds. It is also expressly understood that the Owner conducts the adjustment, removal, or relocation at its own risk, and that the Owner agrees to indemnify and hold the City harmless for damage to existing facilities caused by the conduct of the Owner or any third party working on behalf of Owner. The signatories to this agreement warrant that each has the authority to enter into this agreement on behalf of the party represented. OWNER Owner: Enterprise Crude Pi eline, LLC By: Michael D. Brown Title: Attorn In Fact Date: "`1' 13 Design UTILITY CITY By: THE CITY OF PEARLAND, TEXAS j/ Title: City Manager Date: April 25, 2011 2 of 2 D12. Revised 6/08 STANDARD UTILITY AGREEMENT Ac'rum,cosi'-CITY County:Brazoria County Road:Bailey Road Project NO.:-.T08002: Front 1600 feet west of FM 1128 CSJ:.NIA To Veterans Drive RoadProjecttetting Pate:September 2011 This Agreement by and between:the City or Pearland, Texas, ("City"), acting byand.through its duly authbrited, official,and Enterprise Crude Pipeline, r.4.,c; acting by and through*duly authorized representative„ ("Owner"), shall be effective on the date tif approval and execution by and on behalf of the City. WHEREAS, the City has determined that it is necessary to make certain improvements to Palley Rd., Which said changes are generally described as follows: Widen to 4.1artes WHEREAS, these proposed roadway improvements Will necessitate the adjustment, remeval, and/or relocation of certain facilities of Owner as indicated in the following statement of work The scope of this project is to lower anti replace approximately 621 of existing 16— Enterprise South Texas Crude Lines, West Columbia to Shaver Junctien, Line C90 to accommodate the proposed Bailey Rcl.. Reconstruction and Storm Sewer Installation Project(35.2"41)and Enterprise Line Maintenance(270'40 in the City of Pearland,Brazoria. County,Texas The proposed pipeline relocation is shown on the attached Drawing No.1815,1-9201. as further described in Exhibit'A"and suCh work is described in Owner's Estimate(estimated at$453,000)„Which is attached hereto and made a part,hereof as Exhibit-,"Ad",and.which is Prepared in form and manner required by-.23. CPR 645,Subpart-A,and amendments thereto;and WHERtAS, the.Owner ii has provided sufficient legal authority to the City'to establish an interest in properties affected by the-abrivethentioned roadway imProvernents. Said facilities are located upon such properties as indicated in the statement of work as described in Exhibit NOW,ThEREFORE, in consideration of the covenants and agreements herein contained, the parties mutually agree as follows: The City will pay for costs incurred in the adjustment Or relocation of.Owner's facilities to the extent anthotiied under Title 23, Code of Federal Regtilations,,Partr6-45, Subpart A. The City'S_participation shall consist of Sixty Sik Percent(66%)of the eost Of the adjustrnent or reloCation. The Owner has determined that the method to be used in developing the adjustment or relocation costs shall be as specified for the Method checked and described hereinafter: (1-) Actual direct and related indirect costs accumulated in accordance with a work order accounting procedt0e prescribed.by the applicable Federal or State regulatory body, et (2) Actual direct and related indirect costs- accumulated in :accordance With --an established accounting procedure developed by the 9%iver and approved by the City, Subject to the participation percentage as set out aboste,the City will,upon satisfactory completion oftheiadjustmedt-or relocation,and upon receipt of a final.billing.prepared in the form and Manner prescribed by Federal regulations, make payment in the amount of SixtYSiXPereent(46%)of the eligible ceStS es shown in the final billing The final,billing for work completed herein.:shall be submitted to the City not later than ninety (90) days after completion of the work: Upon receipt of the final billing and conclusion Of the audit,the City agrees to pay Owner one hundred,(100%) of its Share.of the eligible cost as indicated above. The City shall make payment within 45 days of acceptance of the final billing, DeSi Liri br,z D12-,Re.,,r,&'d 6/08 In the event there is a substantial change for the statement of work contained in Exhibit"A",.reimbursenient is limited to Sixty-Six percent (66%) of the amount approved and actually expended pursuant to this agreement and its attached exhibits unless.written approval is obtained from the.City. All changes shall be documented on the Owner's"as-built" plans supplied to the City. City shall reimburse Owner for any additional cost.or'expense caused by any unreasonable delays waiting for City's written approval. Upon execution of this agreement by all parties;the City will,by written notice, authorize the Owner to proceed with the necessary adjustment or relocation,and the Owner agrees to prosecute such work diligently in accordance with the Owner's plans. Such plans are attached as Exhibit "B". Owner shall provide the City with forty-eight (48) hours written notice prior to proceeding with the adjustment or relocation and agrees to proceed in such a manner that will not result in avoidable delay or interference with the City's roadway construction. Should Owner by its actions cause interference or delay resulting in the imposition of damages to the City by a third party, Owner agrees to be responsible for damages including attorney's fees, defense of claims and indemnification associated with said damages. Such authorization to proceed shall constitute notice on the part of the City that the relocation has been included in an approved program as.an item of right of way acquisition,that a project agreement which includes the work has or will be executed, and that the utility relocation or adjustment will be required by the final approved project agreement and plans. The Owner'will retain records of such costs in accordance With the provisions of.23 CFR Part 645,Subpart A. The Parties, by execution of this agreement, not waive any rights to which each party may legally have within the limits of the law. This agreement is subject to cancellation by the City at any time up to the date that work under this agreement has been authorized. City shall reimburse Owner 100% of all cost,incurred by Owner up to the date of receipt of Notice of Cancellation. The City Auditor may conduct an audit or-investigation of any entity receiving funds from the City directly under this contract or indirectly through a subcontract under this contract. Acceptance of funds directly under this contract or indirectly through a subcontract under this contract acts as acceptance of the authority of the City Auditor, to conduct an auditor investigation in connection with those funds. It is also expressly understood that the Owner conducts the adjustment,removal, or relocation at its own risk,and that the Owner agrees to indemnify and hold the City harmless for damage to existing facilities caused by-the conduct of the.Owner or any third'party working on behalf of Owner. The signatories to this agreement warrant that each has the authority to enter into this agreement on behalf of the party represented. UTILITY CITY OWNER THE CITY-OF PEARLAND;--TEXAS Owner Enterprise Crude;Pipeline,LLC. ' )-.. ,:J• By: By:Michael.D.Brown Title: Title: Attorney--In-'Fact Date: t3� tf Date:_ - - - iacs gn 2 of 2 D12.Revised 6/08 E Ent rise Products' � Exhibit A Project Scope and Schedule AFE Project No.: P-16564 Project Title: City of Pearland, Bailey Rd. Reconstruction Proj.—Adjust 16" Line C90 City/County/State: Pearland, Brazoria Co.,Texas Date: 3/9/2011 Scope of Work: The scope of this project is to lower and replace approximately 622'of existing 16" Enterprise South Texas Crude Lines,West Columbia to Shaver Junction, Line C90 to accommodate the proposed Bailey Rd. Reconstruction and Storm Sewer Installation Project(352'+/-)and Enterprise Line Maintenance (270'+/-)in the City of Pearland, Brazoria County,Texas.The proposed pipeline relocation is shown on the attached Drawing No. 18254-9201. A. Engineering, surveying and preparation of drawings-(By Enterprise/Others) B. Procurement and delivery of materials—(By Enterprise/Others) • C. Construction—By Enterprise/Approved Pipeline Contractor includes but not limited to: 1. Contractor Mobilize/Demobilize 2. Receive/Unload/String—Line Pipe&Fittings 3. Prefab/Fit/Weld-Replacement Section 4. Radiography 5. Horizontal Directional Drilling 6. Excavate, Expose P/L tie-in 7. Furnish &Dispose Hydrostatic Test Water 8. Pre-Hydrostatic Test-HDD Pipe Section 9. Drying Pipe Section 10.Tie-Ins, Pipe Coating Repair • 11. Refill existing line with Nitrogen 12. Cap&Fill with Nitrogen P/L Sect. under Bailey Rd. 13.Asbestos Containing Material Abatement if necessary. 14. Remove and Dispose 620' Sect. of P/L 15. Backfilling using previously excavated material to 90-95%compaction. 16. Site clean-up 17. Restore site to original condition or better. Notes: 1.The contractor will make all notifications to governmental agencies(including"One Call Notifications")for all excavation activities. 2.All work to be coordinated with Enterprise Pipeline Operations 3.All work to be done in compliance with Enterprise Guidelines/Safety and Specifications. Schedule: 8-10 weeks Timeline: Engineering/Survey/Design: 75% Complete Procurement:4-5 Weeks Construction:4-5 Weeks Reference Drawings: Enterprise HDD Plan & Profile Drawing No. 18254-9201 Enterprise Contacts: Jess Sibal—713-803-8760;jsibal@eprod.com Jimmy Hicks-713-446-5099, JDHicks@eprod.com Ed Sangel—713.803.8753, esangel@eprod.com Exhibit A-1 Encroachment Project - Cost Estimate AFE No.: P-16564 Location: Bailey Rd.,City of Pearland,Brazoria Co.,TX Date: 4/5/2011 Project: City of Pearland,Bailey Rd.Reconstruction Proj.-Adjust 16"Line C90 Revised: Owner: Enterprise Crude Pipeline,LLC By: Jess Sibal Operator: Enterprise Crude Pipeline,LLC Checked: Ed Sangel Reimbursable:Partially Reimbursable by City of Pearland(See Page 4) LAB&MATL CODE DESCRIPTION QTY UNIT unit cost LABOR unit cost MATL SUB-TOTAL TOTAL ROUNDED 904 CONTRACT PROJECT MANAGEMENT j Project Manager 60 hours $100 $6,000 $0 $0 $6,000 ' Construction Manager 30 hours • $110 $3,300 $3,300 $9,300 $9;000 905 OUTS ENGGISURVEY SERVICES Pipeline Engineering 120 hours $125 $15,000 $0 $0 $15,000 Survey Services 4 days $2,500 $10,000 $0 $0 $10,000 Drafting Services 40 hours $115 $4,600 $0 $0 $4,600 ROW&Permitting Services 24 hours $95 $2,280 $0 $0 $2,280 Admin Services 24 hours - $65 $1,560 $0 $0 $1,560 $33,440 $33,000 907 OUTSIDE INSPECTION SERVICES Inspector-ConstructionCOR 14 days $800 $11,200 $0 $0 $11,200 Inspector-Pipe&Coating 6 days $800 $4,800 $0 $0 $4,800 X-Ray Crew-incl in 987 0 days $0 $0 $0 $0 $0 $0 $0 $0 $0 $16,000 :$16,000 • 908 EPC ENGINEERING&INSPECTION Engineering-Project Manager 30 hours $100 $3,000 $0 $0 $3,000 ' Const&Insp Supervisor 12 hours $85 $1,020 $0 $0 $1,020 ROW Representative 12 days $600 $7,200 $0 $0 $7,200 • EH&S Personnel 16 hours $75 $1,200 $0 $0 $1,200 Pipeline Controls 0 $0 $0 $12,420 '$12,000 • 934 PROTECTIVE COATING COATING MAT'LS AND PAINT Special Polymer Coating"SP-2888 R.G. 10 gallon $80 $800 $800 . ' Primer 10 gallon $25 $250 $250 • ' Epoxy Patch kits 5 lot $200 $1,000 $1,000 Shrink Sleeves 0 0 $0 $0 $0 Primer Kits 1 5 each $35 $175 $175 Budget Est.-City of Pearland Bailey Rd.Reconst.-16"Line C90.xls Page 1 of 4 Exhibit A-1 Encroachment Project - Cost Estimate AFE No.: P-16564 Location: Bailey Rd.,City of Pearland,Brazoria Co.,TX Date: 4/5/2011 Project: City of Pearland,Bailey Rd.Reconstruction Proj.-Adjust 16"Line C90 Revised: Owner: Enterprise Crude Pipeline,LLC By: Jess Sibal Operator: Enterprise Crude Pipeline,LLC Checked: Ed Sangel Reimbursable:Partially Reimbursable by City of Pearland(See Page 4) LAB&MATL CODE DESCRIPTION QTY UNIT unit cost LABOR unit cost MATL SUB-TOTAL TOTAL ROUNDED Taxes at 8.25% $184 $184 Freight and Misc.(8%of subtotal) $193 $193 • CATHODIC PROTECTION Test Stations(Cathodic Protection) 1 each $1,000 $1,000 $1,000. ' Taxes at 8.25% $83 $83 Freight and Misc.(8%of subtotal) $87 $87 . $3,770 ' $4,000' 935 PIPING LINE PIPE AND FITTINGS , 16"O.D.x 0.375"W.T.,API 5L X-52 w/14-16 mils FBE coated&25-30 mils ARO 380 feet $90 $34,200 $34,200 16"O.D.x 0.375"W.T.,API 5L X-52 w/14-16 mils FBE coated 40 feet $80 $3,200 $3,200 16"ODx0.375"WT 45°8D Bends FBE 2 each $6,100 $12,200 $12,200 coated Warning Tape 4 roll $50 $200 $200 Pipeline Warning Signs 2 each $80 $160 $160 Taxes at 8.25% $4,122 $4,122 Freight and Misc.(8%of subtotal) $4,327 $4,327 $58,408 , $58,000 951 LAND&P/L RIGHT OF WAYS Land Acquisition 0 days $0 $0 $0 $0 $0 Right-of-Way Acquisition 0 rod $0 $0 $0 $0 $0 Damages-Work Space Easement 12000 sq.ft. $1 $12,000 $0 $0 $12,000 $12,000 $12,000 •. 964 PERMITS,LEGAL&PROF.SERVICES Professional Services 1 each $3,000 $3,000 $0 $0 $3,000 $3,000 $3,,000. ' Budget Est.-City of Pearland Bailey Rd.Reconst.-16"Line C90.xls Page 2 of 4 Exhibit A-1 Encroachment Project - Cost Estimate AFE No.: P-16564 Location: Bailey Rd.,City of Pearland,Brazoria Co.,TX Date: 4/5/2011 Project: City of Pearland,Bailey Rd.Reconstruction Proj.-Adjust 16"Line C90 Revised: Owner: Enterprise Crude Pipeline,LLC By: Jess Sibal Operator: Enterprise Crude Pipeline,LLC Checked: Ed Sangel Reimbursable:Partially Reimbursable by City of Pearland(See Page 4) LAB&MATL CODE DESCRIPTION QTY UNIT unit cost LABOR unit cost MATL SUB-TOTAL TOTAL ROUNDED 983 OPS&MAINT DEPT ASSISTANCE O&M Supervisor 16 hours $85 $1,360 $0 $0 $1,360 Corrosion Tech. 16 hours $65 $1,040 $0 $0 $1,040 Operations Tech. 2 days $600 $1,200 $0 $0 $1,200 $3,600 $4,000, 985 HOME OFFICE&TRAVEL 1 lot $1,000 $1,000 $0 $0 $1,000 $1,000 -$1,000 987 GEN CONST CONTRACTS Construction-Horizontal Directional Drilling Prime Contractor 1 LS $167,000 $167,000 $0 $0 $167,000 Contractor Mobilize/Demobilize Receive/Unload/String-Pipe&Material " Prefab/Fit/Weld-Replacement Section , Radiography Horizontal Directional Drilling Excav,Expose P/L tie-in&Backfill&Misc. Furnish&Dispose Hydrostatic Test Water Pre-Hydrostatic Test-HDD Pipe Section . Drying Pipe Section Tie Ins,Pipe Coating Repair Misc.-Traffic Control,Silt Fence,Dewatering Cap&Fill with Nitrogen&Abandon P/LSect. $0 $0 $0 $0 $0 Remove and Dispose Sect.of P/L 360 feet $35 $12,600 $0 $0 $12,600 Nitrogen Svcs-Purging 16"Line C90-6miles 1 lot $4,000 $4,000.00 $4,000 ' Cleanup and Disposal Site Restoration Asbestos Abatement Services 1 lot $6,000 $6,000 $0 $0 $6,000 $189,600 $190,000 " SUB-TOTAL $276,360 $66,179 $342,539 $342,539 $343,000 ' Budget Est.-City of Peadand Bailey Rd.Reconst.-16"Line C90.xls Page 3 of 4 Exhibit A-1 Encroachment Project - Cost Estimate AFE No.: P-16564 Location: Bailey Rd.,City of Pearland,Brazoria Co.,TX Date: 4/5/2011 Project: City of Pearland,Bailey Rd.Reconstruction Proj.-Adjust 16"Line C90 Revised: Owner: Enterprise Crude Pipeline,LLC By: Jess Sibal Operator: Enterprise Crude Pipeline,LLC Checked: Ed Sangel Reimbursable:Partially Reimbursable by City of Pearland(See Page 4) LAB&MATL CODE DESCRIPTION QTY UNIT unit cost LABOR unit cost MATL SUB-TOTAL TOTAL ROUNDED 988 CONTINGENCY 15% Basis $41,454 $9,927 $51,381 $51,381 $51,000 989 CONSTRUCTION OVERHEAD 15% Basis $47,672 $11,416 $59,088 $59,088 $59,000 '. incl Gen&Admin 999 INVENTORY&SPARE PARTS 0 lump sum $0 $0 $0 $0 $0 $0 • $0 Grand Total $365,486 $87,521 $453,007 $453,007 . $453,000 Estimate is based on the following: Fair to good weather Company hourly rates-non profit number All pipe materials purchased by Enterprise ESTIMATED COST SHARING Nitrogen,caps and coating materials for welds provided by Contractor Enterprise Crude Pipeline,LLC 34.0% $154,020 City of Pearland 66.0% $298,980 The work estimated above includes the following: 100.0% $453,000 Existing pipe is under approximately 5'of cover at the CL of the road Work will be by combination HDD and trench excavation Repair/recoat pipe as necessary 360'of the abandoned line will be removed&disposed of by Contractor. Install new CP test station for 16"Line C90 pipeline Restore right-of-way to original or better conditions. Temporary work space easements are required for horizontal directional drill • • • • • Budget Est.-City of Pearland Bailey Rd.Reconst.-16"Line C90.xls Page 4 of 4 NO 1...A M.•....**IaLcomPILLIPILIRS14-020e-eroltel Mau Ka V40 or MO. HARRIS COUNTY, TEXAS Exhibit B ♦/ SECTION le • D.C.SMITH SURVEY \' H.T.11 B.R.R.CO.SURVEY \ A-SIS A-SIB J NS '\i °+z 1.\ sit �s a4.. °'4,\;A'WC';�C 4S.4 4 q+4 �,r .& a war I.. �a Ss �. o a @'G4 �°a' +� ,lass r .\ 4. • LOT 1 �ic.v 'a �,o• a\a'4.a a`%at Y�IT San , 4x a0. � � � ror. Y. roel 7 \ \ %ASS..\. \ , 4. (al..."//4/14Arajr, 17777 fin,'% j/ls ✓1. ,, '��G v ' TN DA.x F PROPOSED 16•M00 urn \ \ \ \\ / • mom PAUSED PoCNEYli" �. CULF COAST NW[CO. qr�. q q y ���' MS LEA SECTION 3 GARDENS SM. 24 p,1.yD.Fa‘Va ✓� lei r _,_rill rlL� % .W. lki. BAILEY ROAD RITE • III I b € S Avwov,N'A ePI95[°wC e e5 g-b�ob i b b b f:b b E 5 s gad W tlw � anyy- a re' gp g� s 8 e2 5 2 9 _ 55 D R Y E Dc^ R R DOOS 5 5 R , A __ x E ls 4 b:: 6 6 6 6 6 6 C LL A a dE 3 lro a A0mrcu1� aY1av 1 :I N>� :ON.. F . ..... _...: .. _.Daum n•anm Samnm�R.,.B� -)mn,.'rr.,mm;—.n I PROPOSED WELLS ' ,>—.v ..... .... .... ......e ..... .._... ........... ........_.... Ae ae ................ ....• .......... .....�........ ..... ....... : ..... ;... .. ... �...�...... ...... ... ... p .......... ..... .......,... D TOP Or PROPOSED 16'HOD J p.._. ....._..____ .. _._....... ...........__ ...__.... .... _ ...l... ... ..... ........ .. .. ........ . ... .. ........ ........... !of SOP-18.0.O A 0.52Y W.T..AM Sl.N-52.II-18 UILS 7BE a 29-30 MS ARO L72 WOPoZONTAL DIRECTIONAL DRILL RSE SPEDnPITOF Dos`"°°"'as•IOW XL.OM a`CRAW 'ma"' P/L Relocation Length for MD n-.o.•Dam. n,1,2 WAS IIIEPM Enterprise Prop.Line Maint'=270'(+/-) P/L Relocation Length Across Bailey Rd.=3521(+/-) II( SID MIA IimcOIL.o•Im,wn.-.a.n.-I.I..,a ^I Pm..4 u Dd.MLA. Dear a I _ D a am rain.L P.an MT aa Mom onWS Tar.�ac THE ,a, T, on° This Portion of Work Is 100%Cost to Enterprise This Portion of Work Is 34%Cost to AMP.P,tt.NODAN P 1w 1.a,.1011 Enterprise and 66%to City of Pearland a.aN,DYa a19,D,1111RYTO VOTE l a T�AaR e111 w,n,r a • AAM OP.. a n u ISSUEDREVIFOR .NlnAml avr REVIEW nail r MS A IMAM.Mai ARL TO DE M.A.MO 4119•11.1099 KR KM SC.e fat S.STATO4S MID°"00 'N"-°a a"O0.1 Prop.Hot*.Directional Drill for 1611 Line C90 Across Bailey Rd.In Brazorla Co.,TX 20 _ • ID 1 AMC 0.11.11,00.11 01 TOED AS SMON PER ' tip r`' P-NNNNN mO°'"n p10 Total Length of Pipeline Relocation=6221 -Pam- REFERENCE DRAWEES No REVISION 9Y OAE Da ei,'ENTERPRISE PRODUCTS OPERATING LP. cam m mean nnL �i .. �ATP�� aP.� 270/622=43,41%-100°/D Cost to Enterprise Products "' LIMED▪ 1.22, 01 savaq� Aq1.I .-a1Y5 aaTh ILLS PIPS Pe Era. , Neal sits. ieN•,••HARMS cWNTY.TEXAS AS spWN iwwoe ., ELM SWIM 4.004 6 CI ...IC ME,�stews 352/622=56.59%-Cost Sharing Between Enterprise Products&City of Pearland PROPOSED IC ITPROO sw,,E..s PR x ARC caD> WO NDEA BALLY ROAD .PS▪ AMMO9Pre°':aE"®".. °:� A DSO.TOR Ltd aOR ° .P Anv11° '."an'n1 1."."' *lump*lumpn q'^I MOS 18254-9201 B