Loading...
R2011-001 - 2011-01-10RESOLUTION NO. R2011 -1 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING A CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES ASSOCIATED WITH THE WALNUT STREET AND DRAINAGE PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1 That certain contract for construction management services, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2 That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract for construction management services associated with the Walnut Street and Drainage Project. PASSED, APPROVED and ADOPTED this the 10 day of January, A.D., 2011. 'Q'. TOM REID LV e ATTEST: YON ,T C ETARY APPROVED AS TO FORM: c�- 6 t"- DARRIN M. COKER CITY ATTORNEY Exhibit "A" Resolution No. R2011 -1 CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is entered into on JANUARY 10, 2011 by and between the City of Pearland "CITY and COSTELLO, INC. "CONSULTANT The CITY engages the CONSULTANT to perform Construction Manaeement Services for a project known and described as WALNUT STREET ROADWAY AND DRAINAGE IMPROVEMENTS PROJECT (Project #T70024). SECTION I SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A. The CONSULTANT shall perform Construction Management and Construction Services. See Exhibit A, attached, for a detailed SCOPE OF WORK. The PROJECT schedule shall conform to the construction schedule. B. The CONSULTANT acknowledges that the CITY (through its employee handbook) considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the CITY. The CONSULTANT agrees that it will not, directly or indirectly, encourage a CITY employee to engage in such misconduct. C. The CONSULTANT recognizes that all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. D. The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. Design I of 5 D3. Revised 2109 (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non -owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in Iimits "Change in Coverage except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT, CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT'S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. E. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the CONSULTANT, his officers, employees, agents, or subcontractors under this CONTRACT. F. All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. Design 2 of 5 D3. Revised 2/49 SECTION II PERIOD OF SERVICE This CONTRACT will be binding upon execution and end upon completion of the construction related work not to exceed SEVEN (7) months after execution of this contract. SECTION III CONSULTANT'S COMPENSATION A. The method of payment for this CONTRACT is on an hourly basis plus expenses. Total compensation for the services performed shall not exceed the sum of $74,000.00. B. The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT. C. The CITY shall make payments to the CONSULTANT within thirty (30) days after receipt and approval of a detailed invoice. Invoices shall be submitted on a monthly basis. SECTION IV THE CITY'S RESPONSIBILITIES A. The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B, The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize delay in the progress of the CONSULTANT'S work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of the work. The CONSULTANT agrees that 'the CITY'S inspection, review, acceptance or approval of CONSULTANT'S work shall not relieve CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or its sub consultant(s) or in any way affect the CONSULTANT's status as an independent contractor of the CITY. SECTION V TERMINATION A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason with or without cause by delivering written notice to CONSULTANT personally or by certified mail at 9990Richmond Avenue, Suite 450, North Building, Houston, Texas 77042. Immediately after receiving such written notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. Design 3 of 5 D3. Revised 2109 B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials supplied by the CITY on or before the 15 day following termination of the CONTRACT. C. In the event of such termination, the CONSULTANT shall be paid for services performed prior to receipt of the written notice of termination. The CITY shall make final payment within sixty (60) days after the CONSULTANT has delivered to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D. If the remuneration scheduled under this contract is based upon a fixed fee or definitely ascertainable sum, the portion of such sum payable shall be proportionate to the percentage of services completed by the CONSULTANT based upon the scope of work. E. In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. F, If the CITY terminates this CONTRACT for cause and/or if the CONTRACTOR breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney's fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under this CONTRACT. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. SECTION VI ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. Design 4 of 5 D3. Revised 2/09 SECTION VII COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability, and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent fee that has been paid. SECTION VIII- SUCCESSORS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. The parties have executed this CONTRACT this W ti day of January, 2011. City o N ear and Name: Bill Eisen Title: City Manager Costello, Inc. Name: 55 WMa Ac �t��3" -t 199 Title: v m e ''/��r �o% f �"1 %C /`o� d P1 ✓JC.44 Design 5 of 5 D3. Revised 2109 0 January 3, 2011 ctl� Costello, Inc. Engineering Surveying Mr. Trent Epperson Texas Board dPlo&sslo -I Engineers Firm Req.M.11.. N. 200 aplt Projects Manager City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Re: Construction Management Services Proposal Walnut Street Improvements Austin Grand Blvd.) (REVISED) Dear Mr. Epperson: Costello, Inc. (CI) is pleased to provide this construction management proposal for the referenced project. We understand that the City will reconstruct Walnut Street between Austin and Grand Boulevard including all of the paving, drainage, utility, and appurtenance improvements contained in the recently completed contract documents prepared for the City by LJ /A Engineering. Cl will ensure, through the construction management tasks defined in Exhibit "A that the project is completed in general conformance with the approved construction plans, project manual, and associated contract documents. Scope of Work: See Exhibit A) Cl will have no significant involvement in the areas of: Submittal review, RFI review (on design matters) except for tracking routing Public notification and resident education involvement Utility relocation coordination Railroad, TxDOT, Pipeline, and USACOE permitting Compensation: Costello will be compensated for services on a "time and materials, not to exceed" basis. Labor will be charged as Raw Labor times an overall multiplier that includes burden, overhead, and profit. Reimbursable expenses, billed at cost x 1.10, will include all reproduction provided by an outside firm, photographic materials, and developing expense. Mileage will be billed at the current IRS approved rate, special mailings, and deliveries and in -house reproductions are considered pass along charges and will be billed at cost. Detailed billings will be presented supporting such reimbursable expenses. A "level of effort" estimate and a Labor Rate Schedule have been included Exhibits B and C that indicates a total fee of $74,000 not to be exceeded without prior authorization. Assumptions associated with the above proposed fees include: Construction Cost Estimate of $3.1 million, and Duration Estimate of 7 months. 9990 Richmond Avenue Suite 450 North Building Houston, Texas 77042 Phone: (713) 783 -7788 Fax: (713) 783 -3580 www.costelloinc.com Schedule; ct We estimate a 1 month time for construction contract execution. We anticipate a 7 month Construction Period. Please review this proposal and call me at 713 -579 -3850 with any questions that you have on the information presented in this proposal. We look forward to assisting the City implement this important City Capital Improvements Project. Sincerely, Costello, Inc. Samuel se, Jr., RE, Vice President Municipal Services EXHIBIT A CONSTRUCTION MANAGEMENT SCOPE OF SERVICES FOR Walnut Street Improvements Project Design I nr6 DS. Rcvised 7109 BASIC SERVICES: Construction Manager(s) shall render the following professional services to the OWNER in connection with the construction of the Project. I. Pre Construction 1.1. Provide cons tructability review of plans, specifications, contract documents and validity of Engineer of Record's project duration. identify construction issues, conflicts, deficiencies, review the adequacy and accuracy of the design and independent verification of quantities. 1.2.Attend Pre -Bid Meeting; provide feedback to City's Project Manager as necessary. 1.3. Chair Pre Construction Meeting 1.3.1. Schedule and conduct the pre construction meeting; record and disseminate minutes from pre construction meeting. 1.3.2, Set communications protocol and contract administration procedures. 1.3.3. Provide agenda for meeting to cover: Key milestone dates, pay application procedures, schedule, public notification issues and procedures, utility coordination issues, traffic control, permitting, property owner notification and coordination, temporary facilities, etc. 2. Construction Administration and Management Services 2.1.Act as the City's on -site representative and provide overall project oversight. 2.2. Meetings: Schedule and conduct construction progress meetings; record minutes from construction progress meetings and distribute to City Project Manager, Design Engineer and contractor throughout the duration of the project. 2.2.1. Schedule meetings every two weeks, minimum, to review the following: work progress and schedule, outstanding issues, submittals, shop drawings and changes to the work. 2.22 Coordinate additional meetings as necessary to discuss and resolve problems and provide guidance in a timely manner. 2.3. Manage Construction 2.3.1. All final documentation is required as an electronic/digital format. 2.3.2. As field problems arise, notify the Design Engineer and City Project Manager of proposed solutions to resolve problems, 2,3.3. Review and update as -built documents regularly with contractor. Design 2 orb W. Revised 7108 2.3.4, Monitor and ensure adherence to approved project baseline schedule. Review contractor's schedule monthly, ensure compliance with City's intended schedule, and provide recommendations as needed to retain and regain schedule if needed. 2.3.5. Recommend alternate project sequencing /scheduling to keep project on schedule. 2.3.6. Prepare monthly summary report of construction activities with outstanding issues outlined for review. Monthly progress information associated with the project will be submitted to the City for review and approval. 2.4. Coordinate work of contractor with external agencies and utility companies. Coordinate contractor's operations with regard to other City contracts and construction as well as with property owners for planned service outages, street closures, and access control issues to properties including notifications. 2.4.1. Verify construction conformance and compliance with TCEQ, NOI and NOT, if applicable. 2.4.2. Verify construction conformance with permitted activities such as: City of Pearland Permits, U.S. Army Corps of Engineers permits, TxDOT roadway permits, and/or any Railroad agreements. 2.5. Maintain records of all decisions, actions and activities with regard to construction operations (i.e, Change Orders, RFIs and responses, Submittals and responses, Request for Proposals, correspondence, SWPPP inspections.) 3. Pay Applications 3.1. Review and verify quantities provided by contractor on a monthly bases. 3.7.1. Receive and review daily inspection reports and material installed measurements submitted by contractor to the project inspector. Verify work conducted and bid item quantities; review pay estimate and quantities submitted by the contractor with the contractor and Design Engineer for approval or revision prior to submitting Payment Application to City. 3.1.2. Finalize pay application with signatures from Contractor, Engineer and Construction Manager certifying quantities and amounts. Dccign 3 ur6 D5- Revised 7108 31.3. Provide City Project Manager with one original with all original signatures for processing and payment by the 10' day following the cut off date for pay applications. 3.1.4. Track and record requests for rain or other delays with potential to add to Contract Time daily and monthly. 3.1.5. Provide an independent quantity forecast bid items to identify potential quantity over -runs as part of pay estimate review, 3.2, Upon completion of the work, prepare a final progress payment including a balancing change order zeroing out all unused quantities. Identify and add additional quantities and make any approved changes to the Contract Time. 3.21. Review and coordinate with Design Engineer to provide Engineer's recommendation for Substantial Completion or Final Acceptance. (See Close -out Section) 4. Document Control 4.1. Receive, route, track and log all Contractor communications, Submittals, Change Orders, RFls, Pay Applications and Citizen Complaint/Resolution Log. Communicate with Contractor the status of submittal reviews. Create and keep a submittal and RFI log showing status. Notify City Project Manager, Contractor and Design Engineer of time critical issues. 4.2. Respond to RFIs when such response does not require the Engineer's opinion or expertise or direction from City. 4.3.Assemble and maintain notes, comments, sketches and supportive data relative to the Protect to facilitate the revision of drawings to conform to the final as -built conditions. Review Contractor's record keeping periodically to ensure completeness, timeliness and progress. 3. Change Orders 5.1. Prepare and issue request for proposals In a timely manner. Provide RFP and contractor proposal for additional work to City Project Manager and Design Engineer for review and approval. Log and track status of RFP and Responses from Contractor, City and Design Engineer. Dcaign d of 6 D5. Revised 7!08 5.2. Provide recommendation on technical matters as an advocate for the City, Evaluate Contractor's response /proposal for merit, cost, time, accuracy and price practicality. Negotiate with Contractor on City's behalf if required. 5.3. Prepare Change Order and documentation including signatures of Contractor, Engineer and Construction Manager for delivery to City. 6. Testing Laboratory and Results 5.1. Review test reports for compliance with Contract Documents. Log, track and retain test reports for file, Review results with Contractor. Monitor any corrective action and re- testing for compliance, Maintain compliance with City's specifications 6.1.1. Review lab test reports and log any failures. 7. Project Completion and Close out 7.1. A. Provide list of deliverables for substantial completion walk through /inspection, Schedule and conduct project walk through upon receipt of Contractor's notification of substantial completion. Include City Project Manager, Design Engineer and others as directed. Prepare a list of non- conforming work based on visual inspections, Record and monitor contractor's corrective efforts and schedule. Schedule final completion inspection for any remaining corrections. B. Coordinate and obtain Design Engineers sealed completion and Final Acceptance letter. 7.2. Review and compile any Operation and Maintenance documents required from the Contractor forward to Engineer for review. Collect Contractor's closeout documents to review for completeness and accuracy, including; affidavits of final payment, final pay estimates, as built records, redlines and drawings. Once received, forward to Design Engineer along with any supporting documentation. 7.2.1. Upon completion of close out items, provide recommendation for City's Substantial Completion /f=inal Acceptance certificate, 7.2.2. Provide indexed project fifes and redlines to City, 7.3. Conduct Project Close -Out Meeting. 7.4. Prepare and recommend final payment application. Prepare job record logs transmittals, and correspondence reports in an organized file for delivery to City. 7.5. Consult with City on any potential Warranty items requiring repair or replacement. 5 ora U5. Revised 7iUR 8, Warranty Period 8.1 Schedule, arrange and coordinate a One Year Walk- through of the project to review status of the work 30 days prior to expiration of the One Year Maintenance period. 8.2. Provide staff to conduct and participate in the warranty inspections. 8.3. Produce list of work not conforming for presentation to the City Project Manager, Design Engineer and Contractor. Design 6 of 6 Ds. Revised 7foX EXHIBIT B RATE SCHEDULE August 2008 Below are hourly rates for various job classifications. The billing rates are based upon a multiplier times salary cost. Salary Cost is defined as direct salary plus 35% for customary and statutory benefits such as social security contributions, unemployment, payroll taxes, worker's compensation, sick leave, vacation and holiday pay. A multiplier of 3.0 is used to obtain billing rates except for field survey crews and principals, which is a fixed rate per hour. CLASSIFICATION BILLING RATE Principal 200.00 Senior Project Manager 115.00 200.00 Project Manager 110.00 200.00 Senior Project Engineer 95.00 155.00 Project Engineer 70.00 105.00 HydrologistslHydraulic Engineer 95.00 155.00 Staff Engineer 40.00 85.00 Senior Transportation Engineer 115.00 225.00 Transportation Engineer 95.00 155.00 GIS Manager 75.00 115.00 GIS Specialist 55.00 85.00 GIS Technician 35.00 65.00 IT Manager 90.00 115.00 IT Technician 45.00 65.00 Senior Designer 80.00 110.00 Designer 80.00 100.00 Senior Computer Technician 65.00 90.00 Computer Technician 50.00 80.00 Project Representative 55.00 85.00 Clerical 50.00 75.00 Project Surveyor 115.00 225.00 Registered Surveyor 90.00 200.00 Senior Survey Technician 90.00 120.00 Survey Technician 55.00 105.00 1 -Man GPS Survey Crew 110.00 2 -Man GPS /Robotic Survey Crew 140.00 2 -Man Survey Crew 120.00 3 -Man Survey Crew 150.00 W:VWC Schedules%225 RATE April 2008 .doc 0 IL Lu ul 2 EO f k I In k k I 4oltfq `�`'z INTEROFFICE TRANSMITTAL fRARAtt-r‘ 3519 Liberty Dr., Pearland,Texas 77581 r , Ph: (281) 652-1756 Fx: (281)652-1706 sr $ DATE: 2011.01.10 TO: Sonia Webb, Deputy City Secretary From: Patty Patke Projects Dept. COPIES PROJECT - - DESCRIPTION 2 T70024-Walnut Street Construction Management Roadway and Drainage Agreement—Costello, Inc. Improvements ❑ FOR COUNCIL APPROVAL ❑ FOR YOUR FILES ❑ APPROVED AS SUBMITTED 0 FOR SIGNATURE Thank you, Patty Patke Program Specialist Ext.1756 ppatke@ci.pearland.tx.us