Loading...
R2011-007 - 2011-01-10RESOLUTION NO. R2011 -7 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR THE PURCHASE OF A CX80 EXCAVATOR. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1 That contract pricing for the purchase of a CX80 Excavator has been obtained through the Houston Galveston Area Council (Hi -Way Equipment Company, LLC of Alvin, Texas). Section 2 That the City Council hereby awards the contractforthe purchase of a CX80 Excavator, in the amount of $106,833.00. Section 3 The City Manager or his designee is hereby authorized to execute a contract for the purchase of a CX80 Excavator. PASSED, APPROVED and ADOPTED this the 10 day of Resolution, A, D., 2011. TOM REID MAYOR ATTEST: rA, "L_ SWORN N R S E C 1 APPROVED AS TO FORM: J DARRIN M. COKER CITY ATTORNEY • 4/61GCIBuy CONTRACT PRICING WORKSHEET Contract Date. •For Standard Equipment Purchases No.: gef.. 12/13/2010:;5'n:11. Prepared: Buying City of Pearland contractor: Hi-Way Equipment Company LLC Agency: 1 act Cont Prepared : Bob Pearce Tom Singletary Person: By: Phone: 281-652-1600 Phone: 281-331-1521 Fax: 281-652-1710 Fax: 281-331-9209 Email: bpearceci.nearland.tx.us Etna: tsincletaryAhiwayeauip.com Product A104 Description: Case CX80 Excavator w/24"Trenching Bkt Code: $83,227.00 •..............._....• ........Contrat........ ............... ....... ........ ........•• . • • ............ Description Cost Description Cost Backfill Blade Std. Radio AM/FM Std. 1 17"Swing Boom • 4g1-?-41.!Tab 41tMtd. ell.Arm in iietu agiv 0 v. • -_=ita' T,..EREV7biii41,41.114N !13.1ibmT7M.'....... AtIkHP IS"Wide RubaiiKtia.501-lititfoliMted4421.1q ttaliNVC mriq 211.0' litigttztr-110 42"Wide Smootleglikichisf:Egget41211Meiglgliiir-X:14,1241:1 •'5F,r,•••TE'1.• •-•- --- • IS"Trenching BAcker-r • • ---;•-• -•-•,•: ••,•..... rf• $2•:09 .4 0 Double Acting lIgl1r.fil4w/I-fOlnuABA6111_,inpige: Ay Al G s 0 1.17 ,04 Afer Plumbed down to the end of the arm $5,396.00 Climate Control Cab Std. Subtotal From Additional Sheet(s): Subtotal B: $15,301.00 C Unpublished OptLans-Itemize below-Attack additwnnl sheet if necessary (Mote Unpublished ipt:ons are itiiis which.were not aubmittad an.lpriced in.Conlyastor's bid,) Description Cost Description Cost Helac Model PT8 Hydraulic Rotator with extra set of pins I $7,345.00 Extra Set of fittings for attaching Rotator $160.00 Subtotal From Additional Sheet(s): Subtotal C: $7,505.00 Cheek:Total cost of Unpublished Options(C)cannot exceed 25%of the total of the Base Unit For this transaction the percentage is: 8% Price plus Published Options(A+B). .................................... ... . . . ........ Quantity Ordered: 1 X Subtotal of A+B+C: $106,033.00 = Subtotal D: $106,033.00 Description Cost • Description Cost Subtotal E: •••• ................. •• •. ...... ............. :•:-:::•:::•:•:•:. :•:•:•:•:•:•:.:•:•:•:. $106,033.00 30-90 Days