Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
R2011-004 - 2011-01-10
RESOLUTION NO. R2011 -4 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE WALNUT STREET AND DRAINAGE PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1 That the City opened bids for construction services associated with the Walnut Street and Drainage Project, and such bids have been reviewed and tabulated. Section 2 That the City Council hereby awards the bid to Calco Contracting, Ltd., in the amount of $2,858,859.50 Section 3 The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the Walnut Street and Drainage Project. PASSED, APPROVED and ADOPTED this the 10 day of January, A.D., 2011. 2 4 TOM REID MAYOR ATTEST: APPROVED AS TO FORM: (04-� I DARRIN M. COKER CITY ATTORNEY LJA Engineering & Surveying, Inc. ` • 11821 East Freeway Phone 713.450.1300 Suite 400 Fax 713.450.1385 Houston.Texas 77029 www.JJaengineering.com November 30, 2010 Honorable Mayor and City Council City of Pearland 3519 Liberty Drive Pearland, Texas 77581 RE: Bid Tabulation and Recommendation for Award for Construction of Walnut Street Roadway and Drainage Improvements, Austin Street to Grand Boulevard COP PN: T70024 BID NO.: 1011-02 LJA Project No. E042-0070 Mr. Mayor and Council, Bids for construction of the reference project were received at 2:00 P.M., Thursday, November 18, 2010 at the office of the City Secretary and subsequently read in public. Five (5) contracting firms submitted bids for the project. No errors were found in the bids except for Spring Equipment Co. Inc. (the fifth place bidder) submitted an incomplete bid by failing to bid all items on the bid forms. The bidders from low to high and the total amounts bid are as follows: Contractor Location Contract Amount Hassell Construction, Inc. Houston, TX Total Base Bid (Itemsl thru 98) $2,549,703.57 Add Alt. "A" Overlay(Items 99 thru 107) $ 121,425.00 Add Alt. "B" Landscape & Lighting (Items108 thru 137) $ 116,659.20 Total Base Bid, Add Alts. "A" &"B" (Items 1 thru 137) $2,787,787.77 Calco Contracting, Ltd. Houston, TX Total Base Bid (Itemsl thru 98) $2,615,161.30 Add Alt. "A" Overlay(Items 99 thru 107) $ 129,017.00 Add Alt. "B" (108 thru 137) $ 114,681.20 Total Base Bid, Add Alts. "A" & "B" (Items 1 thru 137) $2,858,859.50 Triple B Services, LLP Houston, TX Base Bid (Items 1 thru 98) $2,787,878.25 Add Alt. "A" Overlay(Items 99 thru 107) $ 153,430.50 Add Alt. "B" (108 thru 137) $ 252,493.90 Total Base Bid, Add Alts. "A" &"B" (Items 1 thru 137) $3,193,802.65 Mayor and City Council City of Pearland November 30, 2010 Page No. 2 Texas Sterling Construction Co., Inc. Houston, TX Base Bid (1 thru 98) $2,853,996.00 Add Alt. "A" Overlay (Items 99 thru 107) $ 131,035.00 Add Alt. "B"(108 thru 137) $ 224,103.20 Total Base Bid, Add Alts. "A" & "B"(Items 1 thru 137) $3,209,134.20 A copy of the Bid Tabulation is attached for your reference. The Engineers estimate for the project was as follows: Base Bid (1 thru 98) $3,145,342.50 Add Alt. "A" Overlay(Items 99 thru 107) $ 228,160.00 Add Alt. "B"(108 thru 137) $ 93,650.70* Total Base Bid, Add Alts. "A" & "B" (Items 1 thru 137) $3,467,153.20 • Estimate by Knudson for City of Pearland Economic Development Corp. The low bidder Hassell Construction, of Houston, Texas has been noted to be rather slow in the performance of their construction projects including two TxDOT projects with the City of Pearland. However, their work appears to have been constructed to the required standards. LJA requested a statement of qualifications and financial statement after the bid opening and again in several follow up emails. A statement of qualifications was received on Monday, November 29. As of this letter a financial statement has not been obtained. Calco Contracting Ltd, the second low bidder, has a record of performing the construction projects, including a recent project for the City of Pearland, rapidly and in conformance with the required standards. A statement of qualifications and financial statement was requested from Calco on Monday, November 29 and received this morning by courier. LJA has difficulty recommending the award to the lowest bidder based solely on the cost. Responsiveness, along with previous work performance, and timeliness are important in the completion of a major project and to reduce, as much as possible, the disruption to the lives of the citizens of Pearland. The disruption will affect not only the citizens in general but especially the lives of those citizens living near the construction itself. Therefore, LJA recommends the City award the project to the second lowest bidder, Calco Contracting Ltd. If you have any questions or need additional information, please advise. Sincerely, Charles W. Beere, P.E. Senior Project Manager Attachment cc: Construction File 16.6 H:/Construction/Clients/042/0070/WordConstructionFileDocs/ConstructionFileFolderpocs/BiddingPhase/RECAWD—E042-0070 Walnut Street Roadway Improvements-Electronic.doc Bid Tabulation-Bid Opening,Thursday,November 18,2010 @ 2:00 P.M. Hassell Construction Calco Contracting,Ltd. Triple B Services,LLP Texas Sterling Construction Spring Equipment Co„Inc. City of Pearland 12211 Duncan Rd. 8000 Berwyn Dr. 820 Old Atascocita Rd. 20810 Fembush Lane 13118 Green River Dr. Walnut Street Roadway and Drainage Improvements,Austin Str.To Grand Blvd. Houston,TX 77066 Houston,TX 77037 Houston, TX 77073 Houston,TX 77044 ' LJA PROJECT NO.E042-0070 PH: 281-893-2570 PH: 281-448-2620 PH:281-324-3264 PH:281-821-9091 PH: 281-459-9090 FRN F-1386 E.J.Rebecek, Lorn D.Frazier Donna Burke PAGE 1 Executive Vice President President Sr.Project Administrator Executive Vice President Vice President ".P ":r'_iJ y i 4-�u y}�1-'. ,4 ttx �. �.. t - ,''c -u 115,vav_l 1'w ` djl " e - '- 74 "Es. 1 1L1 0 j .•#! 'rA S .y,}. 'Fs. - F r L ,�f• i � - 7 4--Ob `'~:. i5a t R e.s'I ta;, ,, eA +: 0 ;tt I:1,":it W I r ': LL -+� 31:1��� �,�� a' Lbi ��� 17��.. ��"� (9,:1 i �}"� �-'f7;m, "ss= ._ 1 Mobilization 1 LS $55,000.00 $55,000.00 $55,000.00 $55,000.00 $55,000.00 $55,000.00 $55,000.00 $55,000.00 $310,000.00 $310,000.00 2 Traffic Control and Regulation During 1 LS $139,521.07 $139,521.07 $23,000.00 $23,000.00 58,000.00 $58,000.00 10,000.00 $10,000.00 50,000.00 $50,000.00 Construction,Including Signs and Barricades,in Accordance with MUTCD,Complete in Place 3 Control of Ground Water and Surface Water 800 LF $25.00 :, $20,000.00 $20.00- $16,000.00 $2.50 $2,000.00 $1.00 $800.00 $10.00 $8,000.00 4 Trench Safety System(Storm Sewer) 3,092 LF $0.20 $618.40 . $1.00 $3,092.00 $0.25 $773.00 $0.10 $309.20 $1.00 $3,092.00 5 Trench Safety System(Force Main) 1,140 LF $0.20 $228.00 $1.00 $1,140.00 $0.25 $285.00 $0.10 $114.00 $1.00 $1,140.00 6 Trench Safety System(Water Main) 3,013 LF $0.20 $602.60 $1.00 $3,013.00 $0.25 $753.25 $0.10 $301.30 $1.00 $3,013.00 7 Site Preparation 6.5 AC $4,000.00 $26,000.00 $3,500.00 $22,750.00 $5,200.00 $33,800.00 $7,000.00 $45,500.00 $20,000.00 $130,000.00 8 Excavation for Roadways&Ditches 9,047 CY $8.00 $72,376.00 $7.00 $63,329.00 $10.00 $90,470.00 $11,50 $104,040.50 $8.50 $76,899.50 9 Embankment(Fill) 1,187 CY $5.00 $5,935.00 $10.00 $11,870.00 $5.00 $5,935.00 $7.00 $8,309.00 $5.00 $5,935.00 10 Subgrade(8"Lime Stabilized) 11,730 SY $1.50 $17,595.00 $2.00 $23,460.00 $1.80 $21,114.00 $6.00 $70,380.00 $2.25 $26,392.50 11 Lime(421bs/sy),In Place 246 TN $135.00 $33,210.00 $188.00 $46,248.00 S146.00 $35,916.00 $150.00 $36,000.00 $130.00 $31,980.00 12 16"Water Main(PVC) 55 LF $190.00 $10,450.00 $229.00 $12,595.00 5170.00 $9,350.00 $240.00 $13,200.00 $225.00 $12,375.00 13 12"Water Main(PVC) 2,391 LF $35.00 $83,685.00 $38.00 $86,076.00 $37.00 S88,467.00 $62.00 $148,242.00 . $34.00 $81,294.00 14 10"Water Main(PVC) 110 LF $130.00 $14,300.00 $140.00 $15,400.00 $115.00 $12,650.00 $170.00 $18,700.00 $108.00 $11,880.00 15 8"Water Main(PVC) .457 LF $32.00 $14,624.00 $64.00 $29,248.00 $36.50 $16,680.50 $75.00 $34,275.00 $38.00 $16,452.00 16 12"Water Main(PVC,Angered Constr.) 380 LF $100.00 $38,000.00 $85.00 $32,300.00 $44.00 $16,720.00 $84.00 $31,920.00 $53.00 $20,140.00 17 10"Water Main(PVC,Angered Constr.) 85 LF $95.00 $8,075.00 $80.00 $6,800.00 $48.00 $4,080.00 $96.00 $8,160.00 $48.00 $4,080.00 18 8"Water Main(PVC,Angered Constr.) 248 LF $75.00 $18,600.00 $74.00 $18,352.00 $39.00 $0,672.00 $115.00 $28,520.00 $42.00 $10,416.00 19 16"Water Main(PVC,Angered&Encased 102 LF $250.00 $25,500.00 $198.00 $19,992.00 S340.00 $34,680.00 $260.00 $26,520.00 $212.00 $21,624.00 ' Constr.,'/"wall casing) • 20 12"Water Main(PVC,Angered&Encased 93 LF $200.00 $18,600.00 $179.00 $16,647.00 $350.00 $32,550.00 $230.00 $21,390.00 $177.00 $16,461.00 Constr.,'''A"wall casing) 21 12"Water Main(PVC,Angered&Encased 80 LF $225.00 $18,000.00 $495.00 $39,600.00 $465.00 $37,200.00 $450.00 $36,000.00 $540.00 $43,200.01 Constr.,5/16"wall casing) . 22 Fire Hydrant Assembly 12 EA $4,000.00 $48,000.00 $4,300.00 $51,600.00 $4,900.00 $58,800.00 $4,000.00 $48,000.00 $4,400.00 $52,800.00 23 16"Butterfly Valve w Box 2 EA $2,500.00 $5,000.00 .$3,700.00 87,400.00 $4,250.00 $8,500.00 $3,600.00 $7,200.00 $2,500.00 $5,000.00 24 12"Gate Valve w Box 13 EA $1,900.00 $24,700.00 $2,000.00 $26,000.00 $1,875.00 $24,375.00 $2,000.00 $26,000.00 $1,700.00 $22,100.00 25 10"Gate Valve wBox 3 EA $1,500.00 $4,500.00 $1,700.00 $5,100.00 $1,500.00 $4,500.00 $1,700.00 $5,100.00 $1,400.00 $4,200.00 26 8"Gate Valve w Box 5 EA $1,000.00 $5,000.00 $1,100.00 $5,500.00 $1,000.00 $5,000.00 $1,200.00 $6,000.00 $890.00 $4,450.00 • • Bid Tabulation-Bid Opening, Thursday,November 18,2010 @ 2:00 P.M. Hassell Construction Calco Contracting,Ltd. Triple B Services,LLP Texas Sterling Construction Spring Equipment Co.,Inc. City of Pearland • 12211 Duncan Rd, 8000 Berwyn Dr.. 820 Old Atascocita Rd. 20810 Fernbush Lane 13118 Green River Dr. Walnut Street Roadway and Drainage Improvements,Austin Str.To Grand Blvd. Houston,TX 77066 Houston,TX 77037 0 Houston, TX 77073 Houston,TX 77044 LJA PROJECT NO.E042-0070 PH: 281-893-2570 PH: 281-448-2620 PH:281-324.3264 PH:281-821-9091 PH: 281-459-9090 FRN F-1386 E.J.Rebecek, Lorn D.Frazier Donna Burke 0 0 PAGE 2 Executive Vice President President Sr.Project Administrator Executive Vice President Vice President Ell .' Fi m k IG aft L x l _1.,I} fi r n Il`s • k ; a 'r .4N_:. . _ . 5` tep -. .. '`, rrlo -4 fts:°�fzJ, a: ,. a, FT '^ bv i $,: . ,-` '' E' � _ 27 16"Wet Connection 2 EA $1,700.00 $3,400.00 $1,400.00 $2,800.00 $1,650.00 $3,300.00 $2,600.00 $5,200.00 S340.00 •$680.00 28 12"Wet Connection 1 EA $1,200.00 $1,200.00 $1,300,00 $1,300.00 $900.00 $900.00 $2,000.00 $2,000.00 $1,100.00 $1,100.00 29 10"Wet Connection 4 EA $1,100.00 $4,400.00 $1,200.00 $4,800.00 $850.00 $3,400.00 $2,000.00 $8,000.00 $900.00 $3,600.00 30 8"Wet Connection 1 BA $1,000.00 $1,000.00 $1,000.00 $1,000.00 $685.00 $685.00 $2,000.00 $2,000.00 $700.00 $700.00 31 6"Wet Connection 6 EA $700.00 $4,200.00 $800.00 $4,800.00 $550.00 $3,300.00 $1,800.00 $10,800.00 $550.00 $3,300.00 31A 2"Wet Connection 2 EA $500.00 $1,000.00 $500.00 $1,000.00 $225.00 $450.00 $485.00 $970.00 $1,500.00 $3,000.00 32 Long Service Replacement 8 _ EA $900.00 $7,200.00 $950.00 $7,600.00 $635.00 $5,080.00 $2,200.00 $17,600.00 $1,900.00 $15,200.00 33 Short Service Replacement 3 EA $600.00 $1,800.00 $700.00 . $2,100.00 $445.00 $1,335.00 $2,000.00 $6,000.00 $1,200.00 $3,600.00 34 16"Force Main(PVC) 735 LF $90.00 $66,150,00 $52.00 $38,220.00 $61.00 $44,835.00 $68.00 $48,510.00 $46.00 $33,810.00 35 12"Force Main(PVC) 339 LF $70.00 $23,730.00 $41.00 $13,899.00 $38.00 $12,882.00 $68.00' $23,052.00 • $40.00 $13,560.00 •35A 12"Force Main(PVC,Angered Constr.) 120 LF $100.00 $12,000.00 $109.00 $13,080.00 $65.00 $7,800.00 $85.00 $10,200.00 $82.00 $9,840.00 37 16"Force Main Wet Connection 2 EA $1,400.00 $2,800.00 $1,800.00 $3,600.00 $1,500.00 $3,000.00 $4,000.00 $8,000.00 $2,000.00 $4,000.00 38 12"Force Main Wet Connection 2 EA .$1,100.00 $2,200.00 $1,400.00 $2,800.00 $900.00 $1,800.00 $3,000.00 $6,000.00 $1,500.00 $3,000.00 39 10"Concrete Pavement 11,070 SY $34.00 $376,380.00 $40.75 $451,102.50 $42.30 $468,261.00 $40.00 $442,800.00 $44.00 $487,080.00 • 40 6"Concrete Curb(integral). 4,355 LF $2.00 $8,710.00 $4.90 $21,339.50 $2.75 $11,976.25 $1.50 $6,532.50 $3.00 $13,065.00 41 6"Concrete Curb(special,dowelled) 215 LF $6.00 $1,290.00 $7.00 $1,505.00 $2.80 $602.00 $15.00 $3,225.00 $3.50 • $752.50 42 8"Concrete Curb(integral) 735 LF $2.50 $1,837.50 $7.00 $5,145.00 $6.75 $4,961.25 $2.00 $1,470.00 $8.00 $5,880.00 43 Mill 2"Existing Asphalt Surface 1,620 SY $1.00 $1,620.00 $2.30 $3,726.00 $1.25 $2,025.00 $7.00 $11,340.00 $4.00' $6,480.00 44 Asphaltic Concrete Pavement(2"Thick) 4,260 SY $9.00 $38,340.00 $8.60 $36,636.00 $10.85 $46,221.00 $8.00 $34,080.00 $8.25 $35,145.00 44A Asphaltic Concrete Pavement(2"Thick Type D 85 SY $12.00 $1,020.00 $23.00 $1,955.00 $55.00 $4,675.00 $21.00 $1,785.00 $21.00 $1,785.00 HMAC @ RR) 45 Black Base(8"Thick) • 2,640 SY $30.00 $79,200.00 $31.00 $81,840.00 $28.00 $73,920.00 $30.00 $79,200.00 $30.50 $80,520,00 45A Black Base(16"Thick @ RR) 90 SY $85.00 $7,650.00 $173.00 $15,570.00 $88.00 $7,920.00 $160.00 $14,400.00 $160.00 $14,400.00 46 11'x4'Cone.Box Culvert 402 LF $375.00 $150,750.00 $388.00 $155,172.00 $733.00 $294,666.00 $435.00 $174,870.00 $460.00 $184,920.00- 47 10'x4'Conc.Box Culvert 224 LF $325.00 $72,800.00 $318.00 $71,232.00' $600.00 $134,400.00 $380.00 $85,120.00 $390.00 $87,360.00 48 9'x4'Conc.Box Culvert 370 LF $275.00 $101,750.00 $289.00 $106,930.00 $285.00 $105,450.00 $340.00 $125,800.00 $340.00 $125,800.00 49 8'x4'Conc.Box Culvert 328 LP $250.00 $82,000.00 $242.00 $79,376.00 $266.00 $87,248.00 $315.00 $103,320.00 $300.00 $98,400.00 50 4'x4'Conc.Box Culvert 378 LF $120.00 $45,360.00 $125.00 $47,250.00 $144.00 $54,432.00 $140.00 $52,920.00 $138.00 $52,164.00 51 48"Reinforced Concrete Pipe 70 LF $130.00 $9,100.00 $126.00 $8,820.00 $120.00 $8,400.00 $315.00 $22,050.00 $123.00 $8,610.00 52 36"Reinforced Concrete Pipe 887 LF $72.00 $63,864.00 $105.00 $93,135.00 $84.00 $74,508.00 $150.00 $133,050.00 $92.00 $81,604.00 Bid Tabulation-Bid Opening,Thursday,November 18,2010 @ 2:00 P.M. Hassell Construction Calco Contracting,Ltd. Triple B Services,LLP Texas Sterling Construction Spring Equipment Co.,Inc. City of Peadand 12211 Duncan Rd. 8000 Berwyn Dr. 820 Old Atascocita Rd. 20810 Fernbush Lane 13118 Green River Dr. Walnut Street Roadway and Drainage Improvements,Austin Sir.To Grand Blvd. Houston,TX 77066 Houston,TX 77037 0 Houston,TX 77073 Houston,TX 77044 WA PROJECT NO.E042-0070 PH: 281-893-2570 PH: 281-448-2620 PH:281-324-3264 PH:281-821-9091 PH: 281-459-9090 FRN F-1386 E.J.Rebecek, Lorn D.Frazier Donna Burke 0 0 PAGE 3 Executive Vice President President Sr.Project Administrator Executive Vice President Vice President k �Jt F----4 d d's trzr .4 „ ,, P J 53 30"Reinforced Concrete Pipe 113 LF $55.00 $6,215.00 $73.00 $8,240.00 $64.00 $7,23 r $94.00 $10,622.00 $71.00 $8,023.00 54 24"Reinforced Concrete Pipe 320 LF $40.00 . $12,800.00 $67.00 $21,440.00 $51.00 . $16,320.00 $115.00 $36,800.00 $54.00 $17,280.00 55 18"Reinforced Concrete Pipe 134 LF $33.00 $4,422.00 $58.00 $7,772.00 $43.00 $5,762.00 $92.00 $12,328.00 $47.00 $6,298.00 56 Twin 18"Reinforced Concrete Pipes 571 LF $58.00 $33,118.00 $58.00 $33,118.00 $85.00 $48,535,00 $85.00 $48,535.00 $93.00 $53,103.00 57 Junction Box(C-6) 1 EA $15,000.00 $15,000.00 $8,000.00 $8,000.00 $20,500.00 $20,500.00 $20,000.00 $20,000.00 $13,500.00 $13,500.00 58 Junction Box(B-1) 1 EA $65,000.00 $65,000.00 $44,000.00 $44,000.00 $45,000.00 $45,000.00 $50,000.00 $50,000.00 $33,000.00 $33,000.00 59 Storm Manhole on Box Culvert 14 EA $1,200.00 $16,800.00 $1,200.00 $16,800.00 $2,200.00 $30,800.00 $1,500.00 $21,000,00 $600.00 $8,400.00 60 Storm Manhole 7 EA $3,200.00 $22,400.00 $2,600.00 $18,200.00 $3,400.00 $23,800.00 $4,000.00 $28,000.00 $1,400.00 . $9,800.00 61 Storm Manhole on Existing Sewer 1 EA $5,400.00 $5,400.00 $2,100.00 $2,100.00 $6,600.00 $6,600.00 $9,000.00 $9,000.00 $1,300.00 $1,300.00 62 Curb Inlet,'type"C" 9 EA $2,200.00 $19,800.00 $2,400.00 $21,600.00 $2,500.00 $22,500.00 $1,500.00 $13,500.00 $2,100.00 $18,900.00 63 Curb Inlet,Type"C"Modified 2 EA $2,400.00 $4,800.00 $2,700.00 $5,400.00 $2,450.00 $4,900.00 $4,500.00 $9,000.00 $3,200.00 $6,400.00 _ 64 Area Inlet,Type"A" 1 EA $2,000.00 $2,000.00 $2,600.00 $2,600.00 $2,585.00 $2,585.00 $4,000.00 $4,000.00 $2,200.00 $2,200.00 65 Area Inlet,Type"A"Modified 2 EA $1,500.00 $3,000.00 $1,900.00 $3,800.00 $2,280.00 $4,560.00 $1,200.00 $2,400.00 $3,000.00 $6,000.00 66 Area Inlet,Type"A"on Box Culvert 1 EA $1,200.00 $1,200.00 $1,500.00 $1,500.00 $1,450.00 $1,450.00 $800.00 $800.00 $4,800.00 $4,800.00_ 67 Extreme Event Inlet 12 EA $18,000.00 $216,000.00 $18,000.00 $216,000.00 $15,500.00 $186,000.00 $8,000.00 $96,000.00 $13,500.00 $162,000.00 68 36"Concrete Collar 2 EA $450.00 $900.00 $400.00 $800.00 $200.00 $400.00 $2,000.00 $4,000.00 $730.00 $1,460.00 69 30"Concrete Collar 1 EA $400.00 $400.00 $400.00 $400.00 $150.00 $150.00 $2,000.00 $2,000.00 $730.00 $730,00 70 24"Concrete Collar 1 EA $35.00 $35.00 $400.00 $400.00 $150.00 $150.00 $2,000.00 $2,000.00 $730.00 $730.00 71 Stabilized Construction Exit . 500 SY $22.00 $11,000.00 $10.00 $5,000.00 $5.00 $2,500.00 $10.00 $5,000.00 . $10.50 - $5,250.00 72 Filter Fabric Fence 528 LF $2.00 $1,056.00 $1.00 $528.00 $1.25 $660.00 $1.00 _ $528.00 $0.83 $438.24 73 Inlet Protection Barrier,Stage 1,Reinforced Filter 112 LF $2.00 $224.00 $45.00 $5,040.00 $1.25 $140.00 $1.00 $112.00 $1.25 $140.00 Fabric Fence 74 Inlet Protection Barrier,Stage 2,Sand Bags 60 LF $7.00 $420.00 $45.00 $2,700.00 $6.00 $360.00 $4.00 $240.00 $3.75 $225.00 75 Sodding for Erosion Control 1,120 SY $2.50 $2,800.00 $3.50 $3,920.00 $3.30 $3,696.00 $3.00 $3,360.00 $2.75 $3,080.00 76 Hydromulch Seeding 3.5 AC $1,200.00 54,200.00 $1,100.00 $3,850.00 $1,500.00 $5,250.00 $1,300.00 $4,550.00 $1,295.00 $4,532.50 77 Rock Filter Dam 8 EA $2,000.00 $16,000.00 $400.00 $3,200.00 $370.00 $2,960.00 $18.00 $144.00 $15.36 $122.88 78 Reflective Pavement Marking(W)(RR X) 2 EA $450.00 $900.00 $500.00 $1,000.00 $480.00 $960.00 $450.00 $900.00 $450.00 $900.00 (THERMOPLASTIC) 79 Reflective Pavement Marking(W)(Only) 2 EA $150.00 $300.00 $110.00 $220.00 $165.00 $330.00 $100.00 $200.00 $100.00 $200.00 (THERMOPLASTIC) I Bid Tabulation-Bid Opening,Thursday,November 18,2010(212:00 P.M. Hassell Construction Calco Contracting,Ltd. Triple B Services,LLP Texas Sterling Construction Spring Equipment Co.,Inc. City of Pearland 12211 Duncan Rd. 8000 Berwyn Dr. 820 Old Atascocita Rd. 20810 Fembush Lane 13118 Green River Dr. Walnut Street Roadway and Drainage Improvements,Austin Str.To Grand Blvd. Houston,TX 77068 Houston,TX 77037 0 Houston, TX 77073 Houston,TX 77044 LJA PROJECT NO.E042-0070 PH: 281-893-2570 PH: 281-448-2620 PH:281-324-3264 PH:281-821-9091 PH: 281-459-9090 FRN F-1386 E.J.Rebecek, Lom D.Frazier Donna Burke 0 0 PAGE 4 Executive Vice President President Sr.Project Administrator Executive Vice President Vice President KM B-_ a° - '- 1]� a - t1 1 n 7 .�l I r 4 t o �-ie7 I Jl 4lgg idd? iti•y-ra 'V. z - I IQ.. 'p `'Mk''' .1114-2-1 _. ". .1_. .__ i?.'c , --1 - -+ } 1"r.,_ j F d,. :,r':;.!% 11r,3..r`6. '£__- „4,,,_.,° 80 Reflective Pavement Marking(W)(Arrow) 2 EA $130.00 $260.00 $110.00 $220.00 $142.00 $284.00 $100.00 $200.00 $100.00 $200.00 (THERMOPLASTIC) 80A Raised Pavement Markers 100 EA S4.50 $450.00 $4.30 $430.00 $4.85 $485.00 $3.00 $300.00 $3.00 $300.00 80B.Temporary Raised Wet Reflective Markers 100 EA $4.50 $450.00 $3.25 $325.00 $3.65 $365.00 $3.00 $300.00 No Bid No Bid 81 Traffic Striping,4-inch Dashed White 950 LF $0.50 $475.00 $0.40 $380.00 $0.80 $570.00 $0.35 $332.50 $0.35 $332.50 82 Traffic Striping,4-inch Solid White 1,920 LF S0.50 $960.00 $0.40 $768.00 $0.60 $1,152.00 $0.35 $672.00 $0.35 $672.00 83 Traffic Striping,8-inch Solid White 240 LF $1.25 $300.00 $0.75 $180.00 $1.30 $312.00 $0.70 $168.00 $0,70 $168.00 84 Traffic Striping,12-inch Solid White 450 LF S3.50 $1,575.00 $2.15 $967.50 $3.90 $1,755.00 $2.00 $900.00 $2.00 $900.00 85 Traffic Striping,24-inch Solid White 316 LF $7.00 $2,212.00 $4.30 $1,358.80 $7.75 $2,449.00 $4.00 $1,264.00 $4.00 $1,264.00 86 Traffic Striping,4-inch Solid Yellow 3,180 LF $0.50 $1,590.00 $0.40 $1,272.00 $0.60 $1,908.00 $0.35 $1,113.00 $0.35 $1,113.00 87 Traffic Striping,24-inch Solid Yellow 60 LF $7.00- $420.00 $4.30 S258.00 $7.75 $465.00 $4.00 $240.00 $4.00 $240.00 87A Remove and Replace Traffic Signs 1 LS $2,200.00 $2,200.00 $9,000.00 $9,000.00 $9,500.00 $9,500.00 $10,000.00 $10,000.00 $8,100.00 $8,100.00 88 Wheelchair Ramps 80 SY $95.00 $7,600.00 S720.00 $57,600.00 $110.00 $8,800.00 $100.00 $8,000.00 $60.00 $4,800.00 89 4"Thick Concrete Sidewalk 550 SY $29.00 - $15,950.00 $39.00 $21,450.00 $31.40 $17,270.00 $62.00 $34,100.00 $35.00 $19,250.00 90 200 SY $73.00 $14,600.00 $49.00 $9,800.00 $45.80 $9,160.00 $54.00 $10,800.00 $50.00 $10.000.00 6"Black Unreinforced Concrete(Esplanade Noses) 91 4"Pipe Sleeve(Steel) 134 LF $25.00 $3,350.00 $30.00 $4,020.00 $25.00 $3,350.00 $143.00 $19,162.00 $12.00 $1,608.00 SUBTOTAL BASE BID(ITEMS I THROUGH 91) $2,399,453.57 $2,464,911.30 $2,637,628.25 $2,703,746.00 Incomplete Bid Tabulation-Bid Opening,Thursday,November 18,2010 @ 2:00 P.M. Hassell Construction Calm Contracting,Ltd. Triple B Services,LLP Texas Sterling Construction Spring Equipment•Co.,Inc. City of Pearland 12211 Duncan Rd. 8000 Berwyn Dr. 820 Old Atascocita Rd. 20810 Fernbush Lane 13118 Green River Dr. Walnut Street Roadway and Drainage Improvements,Austin Str.To Grand Blvd. Houston,TX 77066 Houston,TX 77037 0 Houston, TX 77073 Houston,TX 77044 LJA PROJECT NO.E042-0070 PH:281-893-2570 PH: 281-448-2620 PH:281-324-3264 PH:281-821-9091 PH:281-459-9090 FRN F-1386 E.J.Rebecek, Lorn D.Frazier Donna Burke 0 0 PAGE 5 Executive Vice President President Sr.Project Administrator Executive Vice President Vice President �: - '=� _. T''rfn i i = 9' , i "' v ,, ,.OFF t- , o-i .J��7 us L g f ' ) �1 ..kt f+f ,'.. - _ . -. ,�J 7Lre- , t , `..: r�.%�Q: R 3 rail. "lfi _ 1 92 Cement Stabilized Sand 500 Ton $30.00 $15,000.00 $30.00 $15,000.00 $30.00 $15,000.00 $30.00 $15,000.00 $30.00 $15,000.00 93 Machine Excavation to Obtain Stable Trench 500 CY $50.00 $25,000.00 $50.00 . $25,000.00 $50.00 $25,000.00 $50.00 $25,000.00 $50.00 $25,000.00 Bottom or Manhole Base 94 Crushed Rock to Obtain Stable Trench Bottom or 500 CY $25.00 $12,500.00 $25.00 $12,500.00 $25.00 $12,500.00 $25.00 $12,500.00 $25.00 $12,500.00 Manhole Base . 95 Wet Sand Construction for Open Cut Storm Sewers, 650 LF $100.00 $65,000.00 $100.00 $65,000.00 $100.00 $65,000.00 $100.00 $65,000.00 $100.00 $65,000.00 . Water Mains,&Force Mains;All Depths 96 Full Sodding for Erosion Control 500 SY $3.50 $1,750.00 $3.50 $1,750.00 $3.50 $1,750.00 $3.50 $1,750.00 $3.50 $1,750.00 97 Well Point Dewatering System(Installed,Operated, 500 LF $30.00 $15,000.00 $30.00 $15,000.00 $30.00 $15,000.00 $30.00 $15,000.00 $30.00 $15,000.00 and Removed) 98 Railroad Flagmen 20 DAY •$800.00 $16,000.00 $800.00 $16,000.00 $800.00 $16,000.00 $800.00 $16,000.00 $800.00 $16,000.00 SUBTOTAL SUPPLEMENTAL BID(ITEMS 92 THROUGH 98) $150,250.00 $150,250.00 $150,250.00 $150,250.00 $150,250.00 TOTAL BASE BID(ITEMS 1 THROUGH 98) $2,549,703.57 $2,615,161.30 $2,787,878.25 $2,853,996.00 Incomplete • "Measurement shall be Per Linear Foot,Cubic Yard,Ton or Pound of in-place material. Payment to be for cost of material:delivered,handling,placing,compacting,protecting,and curing costs and costs of disposing of native material(If necessary),and all incidental costs associated with the item.Supplemental material Is for material installed at locations other than Indicated on project Plans. Installation of supplemental materials shall be approved by the Engineer. • Bid Tabulation-Bid Opening, Thursday,November 18,2010 @ 2:00 P.M. Hassell Construction Calco Contracting,Ltd. Triple B Services,LLP Texas Sterling Construction Spring Equipment Ca.,Inc. City of Pearland 12211 Duncan Rd. 8000 Berwyn Dr. 820 Old Atascocita Rd. 20810 Fembush Lane 13118 Green River Dr. Walnut Street Roadway and Drainage Improvements,Austin Str.To Grand Blvd. Houston,TX 77066 Houston,TX 77037 0 Houston, TX 77073 Houston,TX 77044 LJA PROJECT NO.E042-0070 PH:281-893-2570 PH: 281-448-2620 PH:281-324-3264 PH:281-821-9091 PH: 281-459-9090 • FRN F-1386 E.J.Rebecek, Lam D.Frazier Donna Burke 0 0 PAGE 6 Executive Vice President President Sr.Project Administrator Executive Vice President Vice President . pp 1 L +ri 1,. IC ��� =*'a�' ?���Bat .._._.r-- �1Z:"_5 a���...° �-.�," .�'16.�f� -EsR _ n..... R:, '-4 ? �1 - � s.,._. _,T gb ADD ALTERNATE"A"(OVERLAY)* 99 Mill Existing Asphalt Pavement(2") 12,500 • SY $1.00 $12,500.00 S1.35 $16,875.00 $1.20 $15,000.00 $2.25 $28,125.00 $1.50 $18,750.00 100 Traffic Control and Regulation During 1 LS $1,700.00 $1,700.00 $1,100.00 $1,100.00 $6,600.00 $6,600.00 $1,000.00 $1,000.00 $30,000.00 $30,000.00 Construction,Including Signs and Barricades,in Accordance wills MUTCD,Complete in Place (Rolling) 101 Asphaltic Concrete Pavement(2"Thick) 12,500 SY $8.00 $100,000.00 58.60 $107,500.00 $10.15 $126,875.00 $7.85 $98,125.00 $7.85 $98,125.00 102 Black Base(8"Thick) 30 SY $170.00 $5,100.00 $31.00 $930.00 $80.55 $2,416.50 $53.00 $1,590.00 $53.00 $1,590.00 103 Traffic Striping,4-inch Dashed White 4,000 LF $0.25 $1,000.00 $0.30 $1,200.00 $0.30 $1,200.00 $0.25 $1,000.00 $0.25 $1,000.00 *(Chlorinated Rubber Paint) • - 104 Traffic Striping,4-inch Solid White*(Chlorinated 4,000 LF $0.25 $1,000.00 $0.30 $1,200.00 $0.30 $1,200.00 $0.25 $1,000.00 $0.25 $1,000.00 Rubber Paint) 105 Traffic Striping,8-inch Solid White*(Chlorinated 40 LF $0.50 $20.00 S0.55 $22.00 $0.60 $24.00 $0.50 $20.00 $0.50 $20.00 Rubber Paint) 106 Traffic Striping,12-inch Solid White*(Chlorinated 100 LF $0.80 $80.00 $1.60 $160.00 $0.85 S85.00 $1.50 $150.00 $1.50 $150.00 Rubber Paint) 107 Traffic Striping,4-inch Solid Yellow 100 LF S0.25 $25.00 $0.30 $30.00 $0.30 $30.00 $0.25 $25.00 $0.25 $25.00 **(Chlorinated Rubber Paint) _ • TOTAL ADD ALTERNATE"A"(ITEMS 99 THOUGH 107) $121,425.00 $129,017.00 $153,430.50 $131,035.00 $150,580.00 *Overlay to extend from the base project(base bid)to the end return at McLean and to the end return at old Alvin Road **Chlorinated Rubber: Sherwin Williams Set fast TM-5126,TM-5129 0 • Bid Tabulation-Bid Opening,Thursday,November 18,2010©2:00 P.M. Hassell Construction Calco Contracting,Ltd. Triple B Services,LLP Texas Sterling Construction Spring Equipment Co..Inc. City of Pearland 12211 Duncan Rd. 8000 Berwyn Dr. • 820 Old Atascocita Rd. 20810 Fernbush Lane 13118 Green River Dr. Walnut Street Roadway end Drainage Improvements,Austin Str.To Grand Blvd. Houston,TX 77066 Houston,TX 77037 0 Houston, TX 77073 Houston,TX 77044 WA PROJECT NO.E042-0070 PH: 281-893-2570 PH:281.448.2620 PH:281-324-3264 - PH:281-821-9091 PH: 281-459-9090 FRN F-1386 E.J.Rebecek, Lom D.Frazier Do, , -. _c_ nna Burke 0 0 PAGE 7 Executive Vice President President Sr.Project Administrator Executive Vice President Vice President rile , .S ,.- ® ..4*r,'�' h 1df,., -`l.:P ae z,�.. .s `_ i .-V •h' TS ADD ALTERNATED"B"(LANDSCAPE AND LIGHTING)* 108 Green Ash(65 gallon) . 3 EA $500.00 $1,500.00 $500.00 $1,500.00 $540.00 $1,620.00 $750.00 $2,250.00 $500.00 $1,500.00 109 Savannah Holly(45 gallon) 25 EA $350.00 $8,750.00 $350.00 $8,750.00 $336.00 $8,400.00 $515.00 $12,875.00 $300.00 $7,500.00 110 Mexican Plum(45 gallon) 9 EA $350.00 $3,150.00 $350.00 $3,150.00 $390.00 $3,510.00 $550.00 $4,950.00 $300.00 $2,700.00 ' 111 Giant Liriope(1 gallon) 240 ' EA $3.50 $840.00 $3.50 $840.00 $6.00 $1,440.00 $5.15 $1,236.00 $12.00 $2,880.00 112 "Gulf Coast"Mutely Grass(3 gallon) 36 EA $17.00 $612.00 $17.00 $612.00 S30.00 $1,080.00 $18.00 $648.00 $25.00 $900.00 113 Aztec Grass(1 gallon) 76 EA S4.50 $342.00 $5.00 $380.00 $7.20 $547.20. $5.00 $380.00 $12.00 $912.00 116 Steel Edge 42 LF $4.00 $188.00 $4.00 $168.00 $12.00 $504.00 $5.25 $220.50 $65.00 $2,730.00 117 Tree Root Barrier(installed) 300 LF $8.00 52,400.00 $8.00 $2,400.00 $18.00 $5,400.00 $12.00 $3,600.00 $15.00 $4,500.00 116 Planting Bed Preparation&Soil Mix 75 CYC 560.00 $4,500.00 $60.00- $4,500.00 $54.00 $4,050.00 $55.00 $4,125.00 $25.00 $1,875.00 • 119 Landscape Mulch-Beds&Tree Wells 30 CYC $33.00 $990.00 $34.00 $1,020.00 $43.20 $1,296.00 $45.00 $1,350.00 $25.00 $750.00. 120 Pavestone"Cobblstone"Pavers,Complete in Place. 527 SF $6.00 $3,162.00 $6.00 $3,162,00 $30.00 $15,810.00 $20.00 $10,540.00 $50.00 $26,350.00 121 Installation and Materials for Spray Zones . 12,516 SF $0.80 $10,012.80 $0.80 $10,012.80 $0.90 $11,264.40 $1.20 $15,019.20 $12.00 $150,192.00 121A Installation of Irrigation Sleeves 350 LF $13.00 $4,550.00 $13.00 $4,550,00 S16.25 $5,687.50 - $48.31 $16,908.50 $6.00 $2,100.00 122 Controller with Pedestal 2 EA $1,400.00 $2,800.00 $1,400.00 $2,800.00 $900.00 $1,800.00 $2,500.00 $5,000.00 $1,900.00 $3,800.00 123 Backflow Preventer(FEBCO#765 2-inch with 2 EA $3,400.00 $6,800.00 $3,300.00 $6,600.00 $1,800.00 $3,600.00 $600.00 $1,200.00 $4,000.00 $8,000.00 Enclosure 124 Water Meter-City of Pearland Standard Meter for 2 BA $2,300.00 $4,600.00 $2,400.00 $4,800.00 $3,600.00 $7,200.00 $3,000.00 $6,000.00 $1,500.00 $3,000.00 2-inch Service 125 Irrigation Meter and Panel Board Unistrut Rack, • 2 Fes, $2,800.00 $5,600.00 $2,750.00 $5,500.00 $4,800.00 $9,600.00 $3,500.00 $7,000.00 $3,000.00 $8,000.00 Complete in Place 126 Performance and Payment Bonds 1 LS $1,900.00 $1,900.00 $1,800.00 $1,800.00 $8,600.00 $8,600.00 $1,750.00 $1,750.00 $40,000.00 $40,000.00 127 One Year Maintenance in Medians Only(from date 12,904 SF $0.60 $7,742.40 $0.60 $7,742.40 $1.20 $15,484.80 $2.00 $25,808.00 $1.25 $16,130.00 substantial completion) . 128 One Year Maintenance Bond for Grass 1 LS $150.00 $150.00 $500,00 $500.00 $3,000.00 $3,000.00 $750.00 $750.00 $4,000.00 $4,000.00 129 One Year Additional Tree Maintenance and 37 EA $120.00 $4,440.00 $124.00 $4,588.00 $360.00 $13,320.00 $75.00 $2,775.00 $250.00 $9,250.00 Warranty including mulch ring(based upon tree quantity) 130 One Year Maintenance Bond for Additional Tree 1 LS $1,800.00 $1,800.00 $1,900.00 $1,900.00 $3,000.00 $3,000.00 $150.00 $150.00 $9,000.00 $9,000,00 Maintenance and Warranty including mulch ring (based upon tree quantity) • • Bid Tabulation-Bid Opening,Thursday,November 18,2010 l 2:00 P.M. Hassell Construction Calco Contracting,Ltd. Triple B Services,LLP Texas Sterling Construction Spring Equipment Co.,Inc. City of Pearland 12211 Duncan Rd. 8000 Berwyn Dr. 820 Old Atascocita Rd. 20810 Fembush Lane 13118 Green River Dr. Walnut Street Roadway and Drainage Improvements,Austin Str.To Grand Blvd. Houston,TX 77066 Houston,TX 77037 0 Houston, DC 77073 Houston,DC 77044 LJA PROJECT NO.E042-0070 PH:281-893-2570 PH: 281-448-2620 PH:281-324-3284 PH:281-821-9091 PH:281-459-9090 FRN F-1386 E.J.Rebecek, Lom D.Frazier Donna Burke 0 0 . rxW Executive Vice President Vice President$PFGE Bi;,{�� Ali. '?per c r Executive Vice President -To ,Presidenti. _ Sr ProjectAdministrator s a v L� =j p ert. �' :� 44 YT - N4i_Rw, �& { -1 r r KatyuY Pot 11'-0„Decorative Pole -d�.*:.. �; �ue4t'E, ._EA $100.0 ;a7r�—��_ :: „' ;>i.- � ��• � a , i��'�, t1 � ,._._ - 1310 $1,300.00 $1.00 $13.00 $4,560.00 $59,280.00 $2,500.00-- $32,500.00 No Bid No Bid 132 Lumiere Post-Top'Arlighting'Fixture 13 EA $100.00 $1,300.00 $1.00 $13.00 $720.00 $9,360.00 $2,500.00 $32,500.00 No Bid No Bid 133 Light Pole Base-complete in place 13 EA $650.00 $8,450.00 $640.00 $8,320.00 $805.00 $10,465.00 $690.00 $7,670.00 $590.00 $7,670.00 134 Electrical Service Rack-complete in place 2 LS S5,000.00 $10,000.00 $4,900.00 $9,800.00 $6,840.00. $13,880.00 $4,550.00 $9,100.00 $4,550.00 $9,100.00 135 Electrical Conduit and Wiring. 1 LS $15,000.00 $15,000.00 $15,500.00 $15,500.00 $22,775.00 $22,775.00 $14,334.00 $14,334.00 $14,334.00 $14,334.00 f - 136 place 2 LS $700.00 $1,400.00 $680.00 $1,360.00 $4,200.00 $8,400.00 $628.00 $1,256.00 S628.00 $1,256.00 137 Electrical Sleeves 400 LF $6.00 $2,400.00 $6.00 $2,400.00 $10.80 $4,320.00 $5.52 $2,208,00 $5.52 $2,208.00 TOTAL ADD ALTERNATE"B"(ITEMS 1D8 THROUGH 137) $116,6$9.20 $114,681.20 $252,493.90 $224,103.20 Incomplete H:/Construction/Clients/042/0070NVordConstructionFileDocs/ConstructionFileFolderpoca/BlddingPhase/E042-0070 Bid Tab 11-16-2010.xls