Loading...
R2010-152 - 2010-11-22 RESOLUTION NO. R2010 -152 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE ORANGE STREET PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with the Orange Street Project, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to Texas Sterling Construction, Company, in the amount of $4,515,742.00. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the Orange Street Project. PASSED, APPROVED and ADOPTED this the 22 day of November, A.D., 2010. TOM REID MAYOR ATTEST: s t �►.��" . SONIA WEBS =` " ' DEPUTY CITY SECRETARY APPROVED AS TO FORM: (ki D RIN M. COKER CITY ATTORNEY ! st��0! GC Engineering, Inc. GCE r 2505 Park Avenue,Pearland,Texas 77581 VII Phone:(281)412-7008,Fax:(281)412-4623 -41 www.gc-engineering.com November 11,2010 Ms.Jennifer Lee,Project Manager City of Pearland 3519 Liberty Drive Pearland,Texas 77581 Re: Orange Street Widening from State Highway 35 to Hatfield Road, City of Pearland,Texas GCE Project No. C-0616 COP PN: T70051,Bid No.: 1011-01 Dear Ms. Leer ��„„ , GC Engineering, Inc. (GCE)has tabulated the bids received for the above project,reviewed unit prices, the total bid values, and the qualifications of the apparent low bidder, Texas Sterling Construction Co. (TSC). Enclosed, please find the tabulation of bids, and the qualification package submitted by TSC. Based on the review, GCE recommends that the City of Pearland award the construction contract for Orange Street Widening from State Highway 35 to Hatfield Road to the low bidder, Texas Sterling Construction Co. If you have any questions or need more information, please contact me at (281)412-7008, Ext. 106. Sincerely, GC ENGINEERING,INC. Ira � A.Mahendra Rodrigo,P.E. Principal Enclosure: G:IProjects',C-0616-Orange Street WIdeninglCorrespondence1101111 Letter to Ms.Lee.doc Page 1 of 1 BID TABULATION Orange Street Widening from SH 35 to Hatfield Road City of Pearland,Texas Bid No.:1011-01 COP No.:T70051 En'Sneer's Estimate Texas Sterling Construction Co. Hassell Construction Co Inc. Triple B Services,L.L.P. Beyer Construction,LLP COP ITEM ITEM DESCRIPTION Ural TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL Section a NO. GUANIITV GENERAL _.. 01505 1 Mobilization LS 1 $330,000.00 $330,000.00 $272,000.00 $272,000.00 $105,571.65 $105,571.65 $80,000.00 $80,000.00 $250,000.00 t $250,000.00 01500 2 Temporary Facilities and Control LS 1 $10,000.00 $10,000.00 $100,000.00 $100,000.00 $180,000.00 $180,000.00 $75,000.00 $75,000.00 $51,099.97 $51,099.97 01564 3 Control of Ground Water in Pipe Trenches LF 4,000 $8.00 $32,000.00 $1.00 $4,000.00 $22.00 $88,000.00 $20.00 $80,000.00 $21.00 $84,000.00 13500 4 Reimbursement of BNSF Railway Company Costs Allowance 1 $45,000.00 845,000.00 $45,000.00 $45,000.00 $45,000.00 $45,000.00 $45,000.00 $45,000.00 $45,000.00 $45,000.00 Subtotal General $417,000.00, $421,000.00 $41e,571.65 $280,000.00 $430,099.97 SITE PREPARATION AND EARTHWORK 02200 5 Site Preparaton STA. 70 $4,000.00 $280,000.00 $2,000.00 $140,000.00 $900.00 $63,000.00 $1,750.00 $122,500.00 $1,400.00 $98,000.00 02220 6 Removal and dispose existing storm sewer(All sizes) LF 2,100 $30.00 $63,000.00 $10.00 $21,000.00 $19.00 $39,900.00 $13.00 $27,300.00 $11.10 $23,310.00 Remove and dispose existing asphalt pavement 02220 7 w/Base S.Y. 23,000 $7.00 $161,000.00 $1.00 $23,000.00 $5.00 $115,000.00 $2.15 $49,450.00 $1.35 $31,050.00 Remove and dispose existing Utilities(including 02220 8 water,sanitary sewer and appurtenances) LS 1 $35,000.00 $35,000.00 $8,000.00, $8,000.00 $13,500.00 $13,500.00 $40,000.00 $40,000.00 $14,000.00_ $14,000.00 Remove and dispose existing concrete base and 02220 9 pavement SY 1,300 $35.00 $45,500.00 $5.00 $6,500.00 $3.70 $4,810.00 $6.25 $8,125.00 $3.95 $5,135.00 02220 10 Remove and Dispose existing structures LS 1 r $2,000.00 $2,000.00 $20,000.00 $20,000.00 $22,000.00 $22,000.00 $5,500.00 $5,500.00 $4,400.00 $4,400.00 02316 11 Roadway Excavation CY 23,000 $8.00 $184,000.00 $9.00 $207,000.00 $10.00 $230,000.00 $6.80 $156,400.00 $8.50 $195,500.00 02910 12 Topsoil,6"thick S.Y. 25,300 $2.00 $50,600.00 $1.50 $37,950.00 $2.20 $55,660.00 $0.40 $10,120.00 $3.50 $88,550.00 13 Tree and Plant Protection LS 1 $10,223.75 $10,223.75 $40,000.00 $40,000.00 $111,000.00 $111,000.00 $50,000.00 $50,000.00 $2,500.00 $2,500.00 Subtotal Site Preparation and Earthwork $831,323.75 $503,450.00 $654,870.00 $469,395.00 $462,445.00 PAVING 02335 14 7%Lime Stabilized Subgrade,8"thick S.Y. 37,500 $4.00 $150,000.00 $5.00 $187,500.00 $1.65 $61,875.00 $1.95 $73,125.00 $1.70 $63,750.00 02335 15 Type A-Hydrated Lime(7%) TON 975 $120.00 $117,000.00 $13.00 $12,675.00 $145.00 $141,375.00 $140.00 $136,500.00 $130.00 $126,750.00 02710 16 Base Course for Pavement,8"Thick S.Y. 4,400 $15.00 $66,000.00 $15.00 $66,000.00 $31.00 $136,400.00 $32.40 $142,560.00 $26.80 $117,920.00 02741 17 Asphaltic Concrete Pavement,2"Thick S.Y. 3,000 $3.00 $9,000.00 $11.00 _ $33,000.00 $10.00 $30,000.00 $22.95 $68,850.00 $10.30 $30,900.00 02744 18 Single Course Surface Treatment S.Y. 2,775 $2.00 $5,550.00 $4.00 $11,100.00 $9.00 $24,975.00 $10.50 $29,137.50 $9.00 $24,975.00 02751 19 8"Jointed,Reinf.Concrete Paveme nt,Sip-form S.Y. 31,500 850.00 $1,575,000.00 $29.00 $913,500.00 $29.00 $913,500.00 $36.45 $1,148,175.00 $41.00 $1,291,500.00 02751 20 4"Concrete Median ,S.V. 50 $30.00 $1,500.00 $54.00, $2,700.00 $30.00 $1,500.00 $52.50 $2,625.00 $44.00 $2,203.00 02751 21 8'Non-Mountable Concrete Curb LF 410 $6.00 $2,460.00 $15.00 $6,150.00 $3.70 $1,517.00 $6.75 $2,767.50 $2.10 $861.00 02751 22 Concrete Sidewalk SF 85,000 $4.50 $382,500.00 $3.50 $297,500.00 $3.50 $297,500.00 $3.30 $280,500.00 $3.65 $310,250.00 02751 23 6"Concrete Pavement,Driveways S.Y. 2,935 $45.00 $132,075.00 $42.00 $123,270.00 $32.00 $93,920.00 $43.95 $128,993.25 $45.50 $133,542.50 02751 24 ADA Access Ramps _ Ea __ 28 $600.00 $16,800.00 $1,000.00 $28,000.00 $1,000.00 $28,000.00 $1,300.00 $36,400.00 $550.00 $15,400.00 02770 25 8"Concrete Curb LF 14.100 $4.00 $56,400.00 $2.00_ $28,200.00_ $2.00 $28,200.00 $2.75 $38,775.00 $2.05 $28,905.00 G:IPro/ectsiC-0616-Orange Street Wden,ngicosi estimete1101109 Bid Estimale1101109 C0616 ad Tabulation.XIS I1/92010 Page 1 of BID TABULATION Orange Street Widening from SH 35 to Hatfield Road City of Pearland,Texas Bid No.:1011-01 COP No.:T70051 Engineer's Estimate Texas Sterling Construction Co. Hassell Construction Co Inc. Triple B Services,L.LP. Beyer Construction,LLP COP ITEM ITEM DESCRIPTION UNIT TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL Saeaene NO. QUANTITY 02770 26 Double Concrete Curb LF 280 $10.00 $2.800.00 $4.00 $1,120.00 $4.00 $1,120.00 $5.50 $1,540.00 $4.10 $1,148.00 02770 27 Concrete Curb B Gutter(for Asphalt Pavement) LF _ 245 $4.50 $1,102.50 $25.00 $6,125.00 $17.00 $4,165.00 $13.00 $3,185.00 $17.10 $4,189.50 02770 28 Pavement Header LF 90 $5.00 $450.00 $4.00 $360.00 $8.00 $720.00 $25.00 $2,250.00 $15.00 $1,350.00 02770 29 Railroad Header LF 290 $8.00 $2,320.00 $10.00 $2,900.00 $31.00 $8,990.00 $25.00 $7,250.00 $5.00 $1,450.00 Subtotal Paving $2,520,957.50 $1,720,100.00 $1,773,757.00 82,102,63325 $2,155,091.00 DRAINAGE _ , 01570 30 Trench Safety LF 6,137 $2.50 $15,342.50 $0.50 $3,068.50 $0.30 $1,841.10 $0.10 $613.70 $0.71 $4,357.27 12"High Density Polyethylene Pipe(HDPE), 02532 31 Driveways LF 484 $25.00 $12,100.00 $27.00 $13,068.00 $22.00 $10,648.00 $45.00 $21,780.00 $26.90 $13,019.60 Precast Concrete Manholes,Dia.Less than 42", 02542 32 Normal Depth EA 13 $3,600.00 $46,800.00 $3,000.00 $39,000.00 $3,100.00 $40,300.00 $2,800.00 $36,400.00 $3,125.00 $40,625.00 Precast Concrete Manholes,Dia.48"-72",Normal 02542 33 Depth -_- EA 12 84,000.00 $48,000.00 $3,000.00 - -.$36,000.00 $3,100.00 $37,200.00 $3,200.00 $38,400.00 $3,443.00 $41,316.00 02542 34 Concrete Manhole,Dia.Less than 42",Extra Depth VF 2 $150.00 $300.00 $200.00 $400.00 $220.00 $440.00 $150.00 $300.00 8241100 $482.00 02542 35 Concrete Manhole,Dia.48"-72",Extra Depth VF 10 $150.00_ $1,500.00 $200.00 $2,000.00 $220.00 $2,200.00 $150.00 $1,500.00 $281.00 $2,810.00 02630 36 18-inch RCP LF 250 $43.00 $10,750.00 $65.00 $16,250.00 $35.00 $8,750.00 $60.00 $15,000.00 $38.50 $9,625.00 02630 37 24-inch RCP LF 1,660 $51.00 $84,660.00 $50.00 $83,000.00_ $32.00 $53,120.00 $62.00 $102,920.00 $43.75 $72,625.00 02630 38 30-inch RCP LF 795 $74.00 $58,830.00 $62.00 $49,290.00 $50.00 $39,750.00 $65.00 $51,675.00 $44.50 $35,377.50 02630 39 36-inch RCP LF 565 $91.00 $51,415.00 $80.00 $45,200.00 $65.00 $36,725.00 $85.00 $48,025.00 $57.50 $32,487.50 02630 40 42-inch RCP LF 515 $120.00 $61,800.00 $110.00 $56,650.00 $84.00 _-$43,260.00 $100.00 $51,500.00 $71.00 $36,565.00 02630 41 54-Inch RCP LF 1,785 $180.00 3321,300.00 $120.00 $214,200.00 $115.00 $205,275.00 $130.00 $232,050.00 $95.00 $169,575.00 02630 42 5'X5'Concrete Box Culvert LF 40 $300.00 $12,000.00 $300.00 $12,000.00_ $165.00 $6,600.00 $210.00 $8,400.00 $169.00 $6,780.00 02630 43 4'X4'Concrete Box Culved LF 43 $250.00 $10,750.00 $200.00 $8,600.00 $200.00 $8,600.00 $160.00 $6,880.00 $205.00 $8,815.00 02631 44 Concrete Headwall EA 1 $10,000.00 $10,000.00 $15,000.00 $15,000.00 $20,000.00 $20,000.00 $15,500.00 $15,500.00 $14,436.00 $14,436.00 02631 45 24"-3:1 Safety End Treatment(SET)wV Cross Bars EA 3 $1,700.00 $5,100.00 $1,400.00 $4,200.00 $1,400.00 84,200.00 $1,500.00 $4,500.00 $937.00 $2,811.00 02631 46 30"-3:1 Safety End Treabn_em(SET)cal Cross Bars EA 2 $2,000.00 $4,000.00 $1,700.00 $3,400.00 $1,800.00 $3,600.00 $1,800.00 $3,600.00 $1,245.00 $2,490.00 02632 47 Type"C"Inlet EA 33 $1,700.00 S56,100.00 84,000.00 $132,000.00 $2,700.00 $89,100.00 $3,200.00 $105,600.00 $2,661.00 887,813.00 02632 48 Type AInlet EA 7 $1,500.00 $10,500.00 $1,600.00 $11,200.00 $2,700.00 $18,900.00 $3,165.00 $22,155.00 $1,906.00 $13,342.00 02632 49 Type E Inlet EA 13 $2,800.00 $36,400.00 $3,000.00 $39,000.00 $1,900.00 $24,700.00 $2,500.00 $32,500.00 $2,452.00 $31,876.00 02632 50 Type"C"Inlet,Extra Depth VF 10 $150.00 $1,500.00 $200.00 $2,000.00 $190.00 $1,900.00 $100.00 $1,000.00 $281.00 $2,810.00 02632 51 Manhole/Junction Box with access EA 3 $10,00000 $30,000.00 $7,000.00 $21,000.00 $8,000.00 S24,000.00 $10,500.00 $31,500.00 $7,222.00 $21,666.00 02633 52 Adjust Existing Storm Inlet EA 7 $1,500.00 $10,500.00 $700.00 $4,900.00 $530.00 $3,710.00 $550.00 $3,850.00 $937.00 $6,559.00 02633 53 ,Adjust Existing Storrs Manhole EA - _ 7 $2,000.00 $14,000.00 $350.00 __$2,450.00. $680.00 _$4,760.00 $950.00 $6,650.00 $1,082.00 $7,574.00 03315 54 Articulated Concrete Block S.Y. 180 $45.00 $8,100.00 $45.00 $8,100.00 $70.00 $12,600.00 $165.00 $29,700.00 $64.00 $11,520.00 Subtotal Storm Sewer $921,747.50 $821,976.50 $702,179.10 $871,198.70 $877,338.87 G IPro)ectstC-0616-Orange Street W1deninglcosl est,matel101109 Bid Eshmate1101109 C0616 Bid Tabulation xis 11/9/2010 Page 2 0l5 BID TABULATION Orange Street Widening from SH 35 to Hatfield Road City of Pearland,Texas Bid No.:1011-01 COP No.:T70051 En liners Estimate Texas Sterling Construction Co. Hassell Construction Co Inc. Triple B Services,L.L.P. Beyer Construction,LLP COP ITEM ITEM DESCRIPTION UNIT TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL Section a No. OUAN7ITY WATER -- - -- -- - ---- .. 01570 55 Trench Safety _LF 5,185 $2.50 $12,962.50 $1.00 $5,185.00 $0.25 $1,296.25 $0.10 $518.50 $0.61 $3,162.85 02417 56 14"Jack and Bore Steel Casing with 8"Waterline LF 600 $150.00 $90,000.00 $190.00. $114,000.00 $230.00 $138,000.00. $118.00 $70,800.00 $237.00 $142,200.00 02417 57 16"Jack and Bore Steel Casing with 10'Waterline LF 90 $150.00 $13,500.00 $200.00 $18,000.00 $250.00 $22,500.00 $140.00 $12,600.00 $245.00 $22,050.00 02417 58 20"Auger Steel Casing with 12"Watedine LF 515 $150.00 $77,250.00 $125.00 $64,375.00 $350.00 $180,250.00 $155.00 $79,825.00 $336.00 $173,040.00 02417 59 20'Jack And Bore Steel Casingwith 12"Waterline LF 110 $150.00 $16,500.00 $395.00 $43,450.00 $350.00 $38,500.00 $480.00, $52,800.00- $336.00 $36,960.00 02510 60 12"PVC Waterline w/fittings LF 4,100 $30.00 $123,000.00 $34.00 $139,400.00 $32.00 $131,200.00 $53.00 $217,300.00, $34.50 $141,450.00 02510 61 10"PVC Waterline wl fittings LF 65 $25.00 $1,625.00 $75.00 $4,875.00 $105.00 $6,825.00 $125.00 $8,125.00 $95.55 $6,210.75 02510 62 8"PVC Waterline wl fittings LF 680 $21.50 $14,620.00 $50.00 $34,000.00 $50.00 $34,000.00 $70.00 $47,600.00 $40.50 $27,540.00 02510 63 6'PVC Waterline wl fittings-See Note 1 below LF 340 $20.00 $6,800.00 $40.00 $13,600.00_ $19.00 $6,460.00 $55.00 $18,700.00 $26.00 $8,840.00 02510 64 12"Gate Valve w/Box EA 13 $1,275_00 $16,575.00 $1,800.00 $23,400.00 $1,900.00 $24,700.00 $2,200.00 $28,600.00 $2,172.00 $28,236.00 02510 65 10"Gate Valve w/Box EA 3 $800.00 $2,400.00 $1,500.00 $4,500.00 $1,600.00 $4,800.00 $1,800.00 $5,400.00 $1,835.00 $5,505.00 02510 66 8"Gate Valve wf Box EA 11 $700.00 $7,700.00 $1,000.00 $11,000.00 $1,000.00 $11,000.00 $1,200.00 $13,200.00 $1,170.00 $12,870.00 02510 67 6"Gate Valve w/Box-See Note 1 below EA 2 $650.00 $1,300.00 $700.00 $1,400.00 $750.00 $1,500.00 $800.00 $1,600.00 $844.00 $1,688.00 02510 68 Short service lead EA 20 $300.00 $6,000.00 $550.00 $11,000.00_ $650.00 $13,000.00 $500.00 $10,000.00 $522.00 $10,440.00 02510 69 Long service lead EA 26 $600.00 $15,600.00 $800.00 $20,800.00 $1,000.00 $26,000.00 $750.00 $19,500.00 $887.00 $23,062.00 02510 70 Blow Off Valves EA 2 $100.00 $200.00 $1,000.00 $2,000.00 $900.00 $1,800.00 $650.00 $1,300.00 $996.00 $1,992.00 02510 71 Wet Connections FA 13 $1,000.00 $13,000.00 $1,700.00 $22,100.00 $900.00 $11,700.00 $1,400.00 $18,200.00 $623.00 $8,099.00 02514 72 Fire Hydrant Assembly EA 16 $2,150.00 $34,400.00 $4,030.00 $64,000.00 __$4,300.00 $68,800.00 $3,350.00 853,600.00 $4,307.00 $68,912.00 02540 73 12"X 8"TS 8 V EA 1 $200.00 $200.00 $5,000.00 $5,000.00 $9,200.00 $9,230.00 $6,000.00 $6,000.00 $3,940.00 $3,940.00 Subtotal Water $453,632.50 8602,085.00 $731,531.25 $665,668.50 S726,197.60 SANITARY SEWER 01570 74 Trench Safety IF 760 $1.50 $1,140.00 $1.00 $760.00 $0.50 $380.00 $0.10 $76.00 $0.81 $615.60 02530 75 4"Gravity Sanitary Sewer LF 70 $14.00 $980.00 $35.00 $2,450.00 $28.00 $1,960.00_ $36_50 $2,555.00 $24.25 $1,697.50 02530 76 6"Gravity Sanitary Sewer LF _ 390 $16.00 $6,240.00 $35.00 $13,650.00 $25.00 $9,750.00 $37.75 $14,722.50 $25.55 $9,984.50 02530 77 12"Gravity Sanitary Sewer LF 50 $20.00 $1,000.00 $75.00 $3,750.00 $50.00 $2,500.00 $70.00 $3,500.00 $33.10 $1,655.00 Sanitary Sewer Force Mains,2-inch Diameter,White 02533 78 Pipe IF 220 $12.00 $2,840.00 $28.00 $6,160.00 $19.00 $4,180.00 $29.00 $6,380.00 $16.25 $3,575.00 Sanitary Sewer Force Mains,4-inch Diameter,White 02533 79 Pipe_ _._ _ LF 40 $15.00 $600.00 $60.00 $2,400.00 $30.00 $1,200.00 $36.00 $1,440.00 $18.50 $740.00 02542 80 Sanitary Sewer Manholes FA 8 $1,675.00 $10,050.00 32,000.00 $12,000.00 $2,500.00 $15,000.00 $5,000.00 $30,000.00 84,131.00 $24,786.00 02633 81 Adjust Manholes __. FA 11 $1,000.00 $11,000.00 $350.00 83,850.00 $600.00 $6,600.00 $650.00 $7,150.00 $1,118.00 $12,298.00 Subtotal Sanitary Sewer $33,650.00 $45,020.00 $41,570.00 $65,823.50 $55,331.60 G tPro/ecfsIC-0616-Orange Street Wdeningkost esfimete1101 r09 Boa Eatenatel101109 C0616 Bid Tabulation.Rls 11NR010 Page 3or5 BID TABULATION Orange Street Widening from SH 35 to Hatfield Road City of Pearland,Texas Bid No.:1011-01 COP No.:T70051 Engineer's Estimate Texas Sterling Construction Co. Hassell Construction Co Inc. Triple B Services.L.L.P. Beyer Construction,LLP Section* 1I N ITEM DESCRIPTION UNIT ouA tTM UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL SIGNS AND PAVEMENT MARKINGS Thermoplastic Pavement Marking(4"wide)White 02761 82 Solid Single LF 1,390 $2.00 $2,780.00 $0.35 $486.50 $0.40 $556.00 $0.35 $486.50 $0.36 $500.40 Thermoplastic Pavement Marking,Double Solid 02761 83 Yellow LF 15,000 32.00 $30,000.00 30.35 $5,250.00 $0.75 $11,250.00 $0.35 $5,250.00 _ $0.36 35,400.00 Thermoplastic Pavement Marking(24"wide)White 02761 84 Solid Single LF 285 $3.40 $969.00 $4.00 $1,140.00 $5.00 $1,425.00 $4.00 $1,140.00 $4.06 $1,157.10 Thermoplastic Pavement Marking(12"wide)White 02761 85 Solid Single LF 1,035 $2.50 $2,587.50 $2.00 $2,070.00 $2.50 $2,587.50 $2.00 $2,070.00 $2.03 _ $2,101.05 Thermoplastic Pavement Marking(6"wide)White 02781 86 Solid Single LF 190 $2.00 $380.00 $0.60 $114.00 $0.55 $104.50 $0.60 $114.00_ $0.61 $115.90 Thermoplastic Pavement Marking(24"wide)YeNow 02761 87 Solid Single LF 520 $2.50 $1,300.00 $4.00 $2,080.00 35.00 $2,600.00 $4.00 82,080.00 $0.41 $213.20 02761 88 Symbol"Arrow,'Thermoplastic Pavement Marking EA 6 $50.00 $300.00 $100.00 $600.00 $104.00 $624.00 $100.00 $600.00 $101.00 $606.00 Symbol Word"Only"Thermoplastic Pavement 02761 89 Marking FA 2 $50.00 $100.00 $100.00 $200.00 $120.00 $240.00 $100.00 $200.00 $101.00 $202.00 90 Remove and Relocate Small Signs EA 37 $500.00 $18,500.00 $350.00 $12,950.00 $175.00 36,475.00 $350.00 S12,950.00 $355.00 $13,135.00 02761 91 Railroad Crossing Thermoplastic Pavement marking FA 3 $50.00 3150.00, $450.00 $1,350.00 3280.00 $840.00 $450.00 $1,350.00 $456.00 $1,368.00 02761 92 Small Aluminum Road Sign FA 3 $0.00 $350.00 $1,050.00 3250.00 $750.00 $350.00 $1,050.00 $355.00 $1,065.00 Raised Reflectorized Pavement Markers(White TY-1- C or YeNow TY-II-A-A),as shown in Plans or as 02761 93 Directed by Engineer. FA 200 $0.00 $3.00 $600.00 $3.30 $660.00 $3.00 $600.00 $3.05 $610.00 02761 94 4"Yellow Traffic Button(Non-Refl.) FA 200 30.00 $3.00 $600.00 $3.00 3600.00 $3.00 3600.00 $3.05 $610.00 36"High,8"Wide,Vertical Panels(VP-IL), Reflectarizing(4"Black and Yellow Stripes at 45°) 95 with surface mounted self-righting base EA 22 $40.00 $880.00 $150.00 $3,300.00 $300.00 $6,600.00 3150.00 $3,300.00 $152.50 $3,355.00 Subtotal Sign and Pavement Markings 857,9411.50 $31,790.50 $35,312.00 $31,790.50 $30,435.65 STORM WATER POLLUTION PREVENTION PLAN 96 Storm Water Pollution Prevention Plan LS 1 $40,000.00 $40,000.00 $1,000.00 $1,000.00 $66,000.00 $66,000.00 $1,500.00 $1,500.00 $5,500.00 $5,500.00 97 Surface Water Quality Monitor Program(SWQMP) LS 1 $15,000.00 $15,000.00 $4,000.00 $4,000.00 $13,200.00 $13,200.00 $8,500.00 $8,500.00 $10,000.00 $10,000.00 01560 98 Filter Fabric Fence-Install and Remove LF 17,000 $4.00 $88,000.00 $0.70 $11,900.00 $1.20 $20,400.00 $1.10 818,700.00 $0.75 $12,750.00 01561 99 Reinforced Filter Fabric Barrier-Install and Remove LF 920 $6.00 $5,520.00 $1.00 $920.00 $1.50 $1,380.00 $1.10 $1,012.00 $1.05 $966.00 100 Inlet Protection Barrier-Install and Remove FA 90 $6.00 $540.00 $50.00 84,500.00 $60.00 85,400.00 $35.00 $3,150.00 $131.00 $11,790.00 101 Rode Filter Dam-Install and Remove LF 70 $40.00 $2,800.00 $25.00 $1,750.00 $32.00 $2,240.00 $18.50 $1,295.00 $19.16 $1,341.20 02921 102 Hldromulch Seeding S.Y. 18,000 $0.15 $2,700.00 $0.30 $5,400.00 $0.35 $6,300.00 $0.30 35,430.00 $0.26 $4,680.00 Subtotal Storm Water Pollution Prevention Plan $134,560.00 $29,470.00 $114,920.00 S39,557.00 $47,027.20 G IProjectsIC-0616-Orange Street IMden,nglcost esbmare1101109 Bid E,t,mote1101109 C0616 Bid Tabulation.xis 11r9/2010 Page 4 of 5 BID TABULATION Orange Street Widening from SH 35 to Hatfield Road City of Pearland,Texas Bid No.:1011-01 COP No.:T70051 Engineer's Estimate Texas Sterling Construction Co. Hassell Construction Co Inc. Triple B Services,L.L.P. Beyer Construction,LLP COP ITEM TOTAL ITEM DESCRIPTION UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL Section r NO_ QUANTITY MISCELLANEOUS ITEMS , 01555 103 Traffic Control and Regulation during Construction LS 1 8210,000.00 $210,000.00 860,000.00 $60,000.00 $33,000.00 $33,000.00 $80,000.00 $80,000.00 $100,000.00 $100,000.00 104 Street Light PVC Conduit-3e LF 1,200 $8.00 $9,600.00 $7.50 $9,000.00 $8.00 $9,600.00 $7.00 $8,400.00 $7.20 $8,640.00 105 Install Traffic Signal Loop Detector LS 1 $2,500.00 $2,500.00 $850.00 $850.00 $900.00 $900.00 $1,100.00 $1,100.00 $1,000.00 $1,000.00 Complete Signalization at Mykawa Road per plans and details and per TxDOT Standards and 106 Specifications,Complete in Place and Operational LS 1 $150,000.00 $150,000.00 $200,000.00 $200,000.00 $190,000.00 $190,000.00 $173,000.00 $173,000.00 $189,000.00 $189,000.00 Subtotal Miscellaneous Items $372,100.00 $269,850.00 $233,500.00 $262,500.00 $298,640.00 SUBTOTAL CONSTRUCTION COST $5,742,917.75 S4,444,742.00 $4,706,211.00 $4,789,366.45 $4,882,607.89 SUPPLEMENTAL ITEMS To be done when authorized by the Engineer and In quantities to be authorized. __ --- 02252 1 Cement Stabilized Sand,compacted in place TON , 200 $40.00 $8,000.00 $15.00 $3,000.00 $22.00 $4,400.00 $20.00 $4,000.00 $13.20 $2,640.00 2 Well Points LP 1,000 $35.00 $35,00.0.00 $10.00 810,000.00 $27.00 $27,000.00 $20.00 $20,000.00 $20.30 $20,300.00 Sanitary Sewer Lead Adjustments(as approved by 3 the City) _ EA 8 $14.00 $112.00 $500.00 $4,000.00 $39.00 $312.00 $1,650.00 $13,200.00 S873.10 $6,984.80 02922 4 Block Sod S.Y. 1,600 $4.00 $6,400.00 $2.50 $4,000.00 $2.25 $3,600.00 $3.55 $5,680.00 $2.79 $4,464.00 5 Miscellaneous Items as approved by the City $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 TOTAL SUPPLEMENTAL ITEMS 899,51200 $71,000.00 $55,312.00 _ 892,580.00 $$4,3SS.e0 TOTAL CONSTRUCTION COST $5,842,429.75 $4,515,742.00 $4,791,523.00 $4,832,246.45 $4,966,996.69 G V'rojeclstC-0616-Orange Street Wdeninglcost esl,mele1101109 Bid Eslimate1101109 C0616 Bid Tabulation.xis I1/9/2010 Page 5 of