Loading...
R98-41 06-08-98 RESOLUTION NO. R98-41 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, ENCOURAGING AND SUPPORTING THE PEARLAND/HOBBY AREA CHAMBER OF COMMERCE INFRASTRUCTURE COMMITTEE'S LIST OF TRANSPORTATION PRIORITY PROJECTS FOR THE PEARLAND AREA. WHEREAS, the City Council recognizes the importance of expanding the area's transportation system to accommodate the public; and WHEREAS, the City Council is dedicated to the construction and improvement of the City's transportation infrastructure; and WHEREAS, the construction and maintenance of roads is important to the economic growth and development of Pearland, and will benefit Pearland residents by stimulating commerce, promoting and developing new business enterprises, and enhancing the health, safety, and welfare of the Pearland citizens; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That City Council encourages and supports the Pearland/Hobby Area Chamber of Commerce Infrastructure Committee's list of transportation priority projects for the Pearland area, a copy of which is attached hereto as Exhibit "A" and incorporated herein for all purposes. PASSED, APPROVED and ADOPTED this ~~'/ Ju~,E the 8th day of Ju .D., TOM REID MAYOR ATTEST: 1998. RESOLUTION NO. R98-41 APPROVED AS TO FORM: DARRIN M. COKER INTERIM CITY ATTORNEY 2 s EXHIBIT tt it City of Pearland �i I Transportation Projects April 22, 1998 • Project rrottt • To Sc_ one Status In Progress McHard Overpass Mykawa • SI-I 35 Four Lanes/Median Bid Awarded Local Funding • Overpass (PEDC) Dixie Farm Road Beamer SH 35 Four Funded 1998 TIP A4vl,a�� Lanes/Median BW 8 McIIard Five Lanes Funded 1998 TIP Magnolia Overpass • p BNSF Tracks Nf1 Grade Separation Funded 1998 TIP SH 35 BW 8 FM 518 Seven Lanes SH 35 TxDOT Project - 2000 FM 518 ' S. City Limit Shoulder/Turn TxDOT Project - 1999 Lanes/Safety Work FM 518 FM 1128 SI-1 288 Add Center Turn TxDOT Project - 1999 Lane• Pearland Park-way Oiler Marys Creek Add Lanes 3 & 4 Pearland Parkway FM 518 Local Project - 1999 1000' North Construct Four Local Project - 1999 Lanes/ Traffic Traffic Signal - Signal TxDOT 1999 Country Club Drive Clear Creek • FM 518 Bridge Extension/ . Pavement Rehab Urban Streets Program Design in Progress • I3'.TRANS2 I Project From . TTo Scope Status Priority Thoroughfares McHard/Pearland Pkwy SI i 35 aW4 @ Four Lane Divided Rep. DeLay Monroe Parkway appropriation approved Pearland Parkway • FM 518 BW 8 c'•' Four Lanes Discussions with Monroe TxDOT to revise TIP CR 101/Oiler Drive SI1 35 (i: Oiler :� Veterans Up to 7 Lanes/ On MTP/ Right of • Rail Overpass Way Study in Progress CR 101 Corridor Veterans SI-I 288 Up to 7 Lanes On MTP/ Right of Way Study in Progress McHard Road SI-I 288 Mykawa Up to 7 Lanes ROW Study in Progress SH 288 BW 8 CR 59 • Frontage Roads No Action Mykawa Hickory Slough Orange g Rebuild to 5 No Action Lanes 3 • • • ti:',TRANS2 2 . Pro ect From .10 Scope Long Range Status Thoroughfare Projects • FM 2234 (McHard Road) FM 521 • SII 288 Widen to Four On MTP Lanes CR 92 (FM 518 SI-I 288 Extension) FM 521 Up to 7 Lanes On MTP/ Right of CR 48 Way Study in Progress Clear Creek • SI-I 6 Up to 7 Lanes Right of Way Study in Progress 1\gykawaNeterans FM 518 Walnut Connect Mykawa No Action • to Veterans SH 288 CR 59 NA Grade Separation : On MTP SH 288 • CR 403 NA Grade Separation No Action Pearland Parkway Oiler CR 129 Extend Ncw Read/ No Action (FM 2231) Connect to Brittany Bay Blvd. In Fricndswood SH 35 FM 518 S. City Limit Seven Lanes Dixie Farm Road/CR 100 No Action • SH 35 Veterans Connect Dixie '. No Action Farm to CR 100 FM 865 (Cullen Blvd) BW 8 FM 518 Widen to Four On MTP Lanes Cullen Blvd./CR 89 FM 518 Connector NA Extend Cullen No Action Blvd.. Southeast to f • CR 89 / I3:•.TRANS2 • 3 • Project From To Scope Status Kirby Drive BW 8 CR 59 Extend New No Action Roadway . CR 128/CR129 @ SH 35 NA Realign CR 129 to No Action Connect to CR 128 @ SI 135 • 3 11:.TRANS2 Project From To Sc_ cane Status • Priority Collector Projects • Magnolia Drive/Southfork Magnolia CR 89 Connect.Niagnolia Right of Way Study in Drive Dead-End to Southfork Drive Progress Barry Rose/Hughes Clear Creek Hughes Road Extend Two Lanes Discussions with TxDOT to Revise TIP Orange Street I-Iatficicl O'Day Extend Ncw No Action Roadway • • • • • • B:,TRANS2 • 5 Project from To S_ s Status • Long Range Collector • Projects CR 403 Stone Roacl Garden Road Extend New No Action Roadway CR 403 SI-I 248 Cullen Widen to Four On MTP Lanes Yost Road Clear Creek Scarsdale (it, Connect Yost to Bogey Way ScarsdaleNo Action Fite . McLean Veterans Extend New No Action Roadway B:\TRANS2 • 6 . Project �I • From To Scope Scope . Status Bridge Replacements Mykawa Hickory Slough NA Bridge Local Funds - Design Replacement in Progress Old Alvin Road Mary's Creek NA . Briclgc On MTP Replacement Old Alvin Road Town Ditch NA Bridge No Action • Replacement •Old Alvin Road Hickory Slough NA Bridge No Action �� Replacement McLean Road Ma,y's Creek NA Bridge No Action Replacement Hatfield Road Hickory Slough NA Bridge No Action , Replacement O'Day Road Hickory Slough NA Bridge No Action • Replacement Roy Road Hickory Slough NA Bridge No Action Replacement Harkey Road Maiy's Creek NA Bridge No Action Replacement `� CR 130 Cowart's Creek NA Bridge On TIP Replacement CR 175 Drainage Ditch NA Bridge On TIP Replacement CR 143 Drainage •Ditch NA Bridge On MTP Replacement - I3:'.TRANS2 7 Protect From To Scot Status Rehabilitation • Projects Harkey FM 518 CR 101 Rebuild to Curb & No Action Gutter Section Fite McLean CR 89 Rebuild to Curb & No Action Gutter Section McLean FM 518 CR ]01 Rebuild to Curb & No Action Gutter Section Veterans Walnut CR 101 Rebuild to Curb & No Action Gutter Section Barr) Rose FM 518 Clear Creek Rebuild to Curb & No Action Guttcr Section Orange Old Alvin Hatfield Rebuild to Curb & No Action • Road Gutter Section Woody FM 518 Orange Rebuild to Curb & No Action Gutter Section Hatfield FM 518 City Limit Rebuild to Curb & No Action Gutter Section O'Day No Action FM 518 City Limit Rebuild to Curb & . • Gutter Section Garden FM 518 .CityLimit Rebuild to Curb & No Action • Gutter Section Max FM 518 CityLimit Rebuild to Curb & No Action Gutter Section B:\TRANS2 8 . Protect From To Scope • Status Yost FM 518 SleepyHollow Rebuild/Widen No Action Drive Old Alvin Road John Lizer Knapp Rebuild to Curb & No Action Gutter Section John Lizer SI-i 35 Shadybend Rebuild to Curb & No Action • Gutter Section Magnolia • S1-I35 Dead End Rebuild to Curb & No Action 'j Gutter Section Walnut FM 518 @ Fin 518 C a Barry Rose McLean Rebuild to Curb & No Action Gutter Section B:\TRANS2 9 Project From To SC°ne Status Other Projects SH 35 John Lizer/ NA Improve Traffic On MTP Magnolia Signals/Drainage SH 35 Knapp NA Improve Traffic On MTP Signals SH 35 Orange Walnut Install ATMS On MTP SH 6 Missouri City SI-I 288 Widen to Six On TIP in Two Phases Lanes FM 518 Westminister Riverside Add Bike Lane On MTP New SH 35 Freeway BW 8 . Alvin Bypass New Freeway On MTP • li fltANS2 l p