R98-41 06-08-98 RESOLUTION NO. R98-41
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, ENCOURAGING AND SUPPORTING THE PEARLAND/HOBBY
AREA CHAMBER OF COMMERCE INFRASTRUCTURE COMMITTEE'S
LIST OF TRANSPORTATION PRIORITY PROJECTS FOR THE PEARLAND
AREA.
WHEREAS, the City Council recognizes the importance of expanding the area's
transportation system to accommodate the public; and
WHEREAS, the City Council is dedicated to the construction and improvement
of the City's transportation infrastructure; and
WHEREAS, the construction and maintenance of roads is important to the
economic growth and development of Pearland, and will benefit Pearland residents by
stimulating commerce, promoting and developing new business enterprises, and
enhancing the health, safety, and welfare of the Pearland citizens; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That City Council encourages and supports the Pearland/Hobby
Area Chamber of Commerce Infrastructure Committee's list of transportation priority
projects for the Pearland area, a copy of which is attached hereto as Exhibit "A" and
incorporated herein for all purposes.
PASSED, APPROVED and ADOPTED this ~~'/ Ju~,E
the 8th day of Ju .D.,
TOM REID
MAYOR
ATTEST:
1998.
RESOLUTION NO. R98-41
APPROVED AS TO FORM:
DARRIN M. COKER
INTERIM CITY ATTORNEY
2
s
EXHIBIT
tt it
City of Pearland �i
I
Transportation Projects
April 22, 1998
•
Project rrottt
•
To Sc_ one
Status
In Progress
McHard Overpass Mykawa
•
SI-I 35 Four
Lanes/Median Bid Awarded
Local Funding
•
Overpass (PEDC)
Dixie Farm Road Beamer
SH 35 Four
Funded 1998 TIP
A4vl,a�� Lanes/Median
BW 8 McIIard
Five Lanes Funded 1998 TIP
Magnolia Overpass •
p BNSF Tracks Nf1
Grade Separation Funded 1998 TIP
SH 35 BW 8
FM 518 Seven Lanes
SH 35 TxDOT Project - 2000
FM 518 ' S. City Limit Shoulder/Turn
TxDOT Project - 1999
Lanes/Safety Work
FM 518 FM 1128
SI-1 288 Add Center Turn
TxDOT Project - 1999
Lane•
Pearland Park-way Oiler
Marys Creek Add Lanes 3 & 4
Pearland Parkway FM 518 Local Project - 1999
1000' North Construct Four
Local Project - 1999
Lanes/ Traffic Traffic Signal -
Signal TxDOT 1999
Country Club Drive Clear Creek
•
FM 518 Bridge Extension/ .
Pavement Rehab Urban Streets
Program Design in
Progress
•
I3'.TRANS2
I
Project From .
TTo Scope Status
Priority
Thoroughfares
McHard/Pearland Pkwy SI i 35
aW4 @ Four Lane Divided Rep. DeLay
Monroe Parkway
appropriation
approved
Pearland Parkway • FM 518
BW 8 c'•' Four Lanes Discussions with
Monroe TxDOT to revise TIP
CR 101/Oiler Drive SI1 35 (i: Oiler :�
Veterans Up to 7 Lanes/ On MTP/ Right of
•
Rail Overpass Way Study in Progress
CR 101 Corridor Veterans
SI-I 288 Up to 7 Lanes On MTP/ Right of
Way Study in Progress
McHard Road SI-I 288
Mykawa Up to 7 Lanes ROW Study in
Progress
SH 288 BW 8 CR 59
•
Frontage Roads No Action
Mykawa Hickory Slough Orange g Rebuild to 5 No Action
Lanes
3
•
•
•
ti:',TRANS2
2
.
Pro ect From
.10 Scope
Long Range Status
Thoroughfare
Projects •
FM 2234 (McHard Road) FM 521 •
SII 288 Widen to Four On MTP
Lanes
CR 92 (FM 518 SI-I 288
Extension) FM 521 Up to 7 Lanes On MTP/ Right of
CR 48 Way Study in Progress
Clear Creek • SI-I 6 Up to 7 Lanes
Right of Way Study in
Progress
1\gykawaNeterans
FM 518 Walnut Connect Mykawa No Action
•
to Veterans
SH 288 CR 59
NA Grade Separation : On MTP
SH 288 • CR 403
NA Grade Separation No Action Pearland Parkway Oiler
CR 129 Extend Ncw Read/ No Action
(FM 2231) Connect to
Brittany Bay Blvd.
In Fricndswood
SH 35 FM 518
S. City Limit Seven Lanes
Dixie Farm Road/CR 100 No Action
•
SH 35 Veterans Connect Dixie
'. No Action
Farm to CR 100
FM 865 (Cullen Blvd) BW 8
FM 518 Widen to Four On MTP
Lanes
Cullen Blvd./CR 89 FM 518
Connector NA Extend Cullen
No Action
Blvd.. Southeast to
f • CR 89
/ I3:•.TRANS2
• 3
•
Project From
To Scope Status
Kirby Drive BW 8 CR 59
Extend New No Action
Roadway
. CR 128/CR129 @ SH 35 NA
Realign CR 129 to No Action
Connect to CR 128
@ SI 135
•
3
11:.TRANS2
Project From
To Sc_ cane Status •
Priority Collector
Projects
• Magnolia Drive/Southfork Magnolia CR 89
Connect.Niagnolia Right of Way Study in
Drive Dead-End
to Southfork Drive Progress
Barry Rose/Hughes Clear Creek
Hughes Road Extend Two Lanes Discussions with
TxDOT to Revise TIP
Orange Street I-Iatficicl
O'Day Extend Ncw No Action
Roadway
•
•
•
•
•
•
B:,TRANS2
•
5
Project from
To S_ s
Status •
Long Range Collector
•
Projects
CR 403 Stone Roacl
Garden Road Extend New
No Action
Roadway
CR 403 SI-I 248
Cullen Widen to Four On MTP
Lanes
Yost Road Clear Creek
Scarsdale (it, Connect Yost to
Bogey Way ScarsdaleNo Action
Fite . McLean
Veterans Extend New
No Action
Roadway
B:\TRANS2 •
6
.
Project �I
•
From To Scope Scope . Status
Bridge Replacements
Mykawa
Hickory Slough NA Bridge
Local Funds - Design
Replacement in Progress
Old Alvin Road Mary's Creek NA .
Briclgc On MTP
Replacement
Old Alvin Road Town Ditch NA
Bridge No Action •
Replacement
•Old Alvin Road Hickory Slough NA
Bridge No Action ��
Replacement
McLean Road Ma,y's Creek NA
Bridge No Action
Replacement
Hatfield Road Hickory Slough NA
Bridge No Action ,
Replacement
O'Day Road Hickory Slough NA
Bridge No Action •
Replacement
Roy Road Hickory Slough NA
Bridge No Action
Replacement
Harkey Road Maiy's Creek NA
Bridge No Action
Replacement `�
CR 130 Cowart's Creek NA
Bridge On TIP
Replacement
CR 175 Drainage Ditch NA
Bridge On TIP
Replacement
CR 143 Drainage •Ditch NA
Bridge On MTP
Replacement -
I3:'.TRANS2
7
Protect From
To Scot Status
Rehabilitation
• Projects
Harkey FM 518 CR 101
Rebuild to Curb & No Action
Gutter Section
Fite McLean CR 89
Rebuild to Curb & No Action
Gutter Section
McLean FM 518 CR ]01
Rebuild to Curb & No Action
Gutter Section
Veterans Walnut
CR 101 Rebuild to Curb & No Action
Gutter Section
Barr) Rose FM 518
Clear Creek Rebuild to Curb & No Action
Guttcr Section
Orange Old Alvin
Hatfield Rebuild to Curb & No Action
•
Road Gutter Section
Woody FM 518
Orange Rebuild to Curb & No Action
Gutter Section
Hatfield FM 518
City Limit Rebuild to Curb & No Action
Gutter Section
O'Day No Action
FM 518 City Limit Rebuild to Curb & .
•
Gutter Section
Garden FM 518 .CityLimit
Rebuild to Curb & No Action
•
Gutter Section
Max FM 518 CityLimit
Rebuild to Curb & No Action
Gutter Section
B:\TRANS2
8 .
Protect From
To Scope • Status
Yost
FM 518 SleepyHollow
Rebuild/Widen No Action
Drive
Old Alvin Road John Lizer
Knapp Rebuild to Curb &
No Action
Gutter Section
John Lizer SI-i 35
Shadybend Rebuild to Curb &
No Action •
Gutter Section
Magnolia • S1-I35
Dead End Rebuild to Curb & No Action 'j
Gutter Section
Walnut FM 518 @ Fin 518 C a
Barry Rose McLean Rebuild to Curb & No Action
Gutter Section
B:\TRANS2
9
Project From To
SC°ne Status
Other Projects
SH 35 John Lizer/ NA Improve Traffic On MTP
Magnolia Signals/Drainage
SH 35 Knapp NA Improve Traffic On MTP
Signals
SH 35 Orange Walnut Install ATMS
On MTP
SH 6 Missouri City SI-I 288 Widen to Six
On TIP in Two Phases
Lanes
FM 518 Westminister Riverside Add Bike Lane
On MTP
New SH 35 Freeway BW 8 . Alvin Bypass New Freeway On MTP
•
li fltANS2 l p