Loading...
HomeMy WebLinkAboutR2010-094 2010-07-12RESOLUTION NO. R2010-94 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING CHANGE ORDER NO. 1 ASSOCIATED WITH THE ANIMAL CONTROL EXPANSION PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That Change Order No.1 associated with the Animal Control Expansion Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Change Order No. 1 associated with the Animal Control Expansion Project, PASSED, APPROVED and ADOPTED this the 12th day of July, A.D., 2010. TOM REID MAYOR ATTEST: APPROVED AS TO FORM: AD6oAL4L, V/42 5,4_6A_ DARRIN M. COKER CITY ATTORNEY AQ Exhibit "A" Resoluti�n No. R2�10-�� C[�'�ic' OF PEARLAND PR[7JECTS DEPARTi�iENT 35[9 Liber#y Driw�e, Suite 30U �eartand, Texas T7581 w ww.cityofpe a r la�d.e o m/pro j e c ts Far Peariand E�nimal Contro� & Adoption Cent+er Date of Issuance: 7/12/2014 Chanae Urder No.. Cantract+�r: JC Stone�vall Cflsntructors, LP CoP Project �io.: Desig�er: Jackson & Ryan Architec P.O. No.: �HANGE ORDER. E�planation: This change �rder encompasses the followin�: 1 k`A07Q1 100742 Descriution of �Vork Cast 'Time 1 Replace interior kennel gates for runs in existing buildir3� $ 13,161.50 0 �ays 2 Repair of HVAC system in existing buildin� $ 3,442.00 Days 3 Repair or replace exhaust turbines in existing kennel (2} $ 4,? 15.00 Days 4 Replaee rusted door ancC frames (4) in existing buildin� � �,S�O.QO Days Replace floors with VCT kile in reception area cak raoin, kitten nursery, hallway, cat impound, �athroocns, shower rootn, 5 kitchen Replace floors with VCT tile in 2nd addition (small hallway, 6 utili�y closet, supervisors office, afficer desk area) 7 Repair drywall dair�age at wall corners throughaut and large $ Repiace baseboards throughout entire existinQ building 9 Paint eYisting kennel area y 10 Paiitt interiar building areas 11 Aepair/�owt masonry in specific areas of existing kennels 12 Cabinet for quarantine area in new addttion I�eplace upper and lo�ver cabinet, backsplash and cc�untertop 13 at cat impound area 14 Replace sink plurnbing #ixture at cat i�n�ound area IS Band 16 Insurance 17 Overhead & Profit t S Extend contract time for items included in CQ # 1 Extend conlract tirne for tiine elapsed between substaniial 19 coinpletion and issuance of CO #1 $ 2,'912.�0 � 2,954.00 $ 425.00 $ 760.00 � 2,616.041 � 3,612.00 � �sa.00 $ 375.Ofl $ 4,212.l10 $ 1,050.00 $ 857.09 $ �0.5b $ 6,562.81 $ - $ Days Days Days Days Days Days Da�s Days Days Days Days Days L3ays 30 Days 125 Days P�ease attach bac�C-ua doc�mentation C�st & Time Chanae Summa� [}riginal Contraet: Arevious Change Order(s): Contract prior to this change ord�r; Tdet increase {decrease} from this chan�e arder Revised Co�trart: Cost $ 477,131.00 � - � 47?,1 � L00 � 50,314.90 � sz�,abs.�o Time 12Q Days Days 120 Days 1�5 Days 275 Days �C'onstruction l of2 Dla. Revised 7r48 Finance Approvai: �� (��, D�te: '�. ��� oZQ1 L� �- � ACCEPTED*: APPRC�VED: B: Dake: �!� 2�/U By: � Dat�: �u� Y 1 2, 2 U 1 u C ntractor Owner Bill Eisen, City Manager 'Contraeto�° aerees [o p�rtonrt chan�elsl included in [f'tis ChanaL drdcr i`oe the pnce and tim� indicated. The prices for chanazs included all cost, assneiatzd with dtiis Cltanee Order. 4 iVo 4vork is to b� eione until tkris r�l7�a�e urcier is exeeute�3. �+o paymesu c� t6�e Contra�tar{or Consultan�) shal� be �na�[e ti�r uc,rk rnclucic�l in th� chane� carder unle] th� Conlr�ctor's pay estima[e is update�3. Revise the prc�ject pl�ns rind �peciticatinns as rzf�renczd and insofar as the ori=irrtB prujtct dr3wings' an�l splciiications ar� inc�5nsisten[, this Change Ordrr governs. Upan executiun t�y all pa�ties, [he follo�� ina clranges iden[itied for the contrac[ value �nd or contr�et time sfto+.va, are made pait of the contract. C�nstruct'son ?�f? D19. Revised 7 08 .>. :._�: � _ v � ..� _ �C O�! S� R U C T O R 5 Phane:{713)660-8334 Fax: {713) 66�-7322 CP No.: Q18 '�itle: Misc work as per RFP 01 Project: FA 07�11 T0: HBLArchitecis Att: Ms. Cara Davis City of Pearland A. �'otal Labor Cost $ - LaborBurden $ - B. Total Materiai Cost $ - �Vlaterial Sales Tax $ - C. Total Equiprnent Gost $ - �quipmer�t Sales Tax $ - D. Subcontractor Unit Cost $ 42,854.50 E. Bond $ $57.09 F. Insurance $ 40.50 Subtatal $ 43,752.09 G. Rllowable Over6�ead & Profit 15% Total Change Propasal Cast Time Extension in �ays (For This CP) $ 6,552.$1 Change Order C� W\0 OH&P $ 50,314.90 $ 42,854.50 3� 30 Description r�f work: Additional Work as per RFP Ol Contractor - 5ignature Date June Approval - 5ignatur�e �ate Appraved As: (PBease Circle) CO No.: Amount Approved: Change Order Allowance Aut�orization AA Na.: CHANGEPRDPOSAL WORKSHEET CP No.: 001 Cast Labor Total �abor Material T�tal �quip Total Equip Subeontractor Total Line Item description af Work Vendor Qty Units Mat�rial 5ubtontractor Code Unit Cost Cast Unit Cosc Unit Cost Cost Unit Cost Total Cost Cost S - S - S - $ - S - Replacelnteriorgates American 22 $ - $ - $ - $ 598.25 $ 13,151.5D $ 13,151.5fl Rep�ir HVAC existing bld 1 Is $ - $ - $ - $ 3,442.Dp S 3,442.a4 S 3,442.Ot3 ReRlace exhaust fans {2} 1 Is $ - $ - $ - $ 4,715AQ $ 4,715A0 $ 4,715.04 Replace doors and frames 4 $ - $ - $ - $ 464.00 $ 1,$40.fl0 $ 1,840.t70 Insia�l VCT recp. 1 is 5 - 5 - 5 - 5 z, 912.00 $ z,9lz.oa $ a,9lz.oa InstatlVC7 office 1 Is 5 - $ - $ - $ 2,954.00 $ 2,954.C?0 5 2,954.Q(} Repair Qrywall I Is $ - $ - $ - $ 425.00 $ 425.00 $ 425,00 Base board thru-out 1 Is $ - $ - $ - $ 760A0 $ 76Q.p0 $ 760.U0 Paint Kennel 1 Is $ - $ - $ - $ 2,616.00 $ z,6�6.G0 $ �,6J6.Q0 Paint lnterior 1 Is $ - $ - $ - $ 3,612.00 $ 3,612.00 $ 3,6] �.40 Repair Masonryr 1 Is $ - $ - $ - $ 78p.Qp $ 780.00 $ 780.00 Cabinet for Quarantine 1 Is $ - $ - $ - $ 375.00 $ 375.00 $ 375,00 Ca6inets Breakroom 1 $ - $ - $ - $ 4,212.Da $ 4,212.00 $ 4,212.40 Sink Plumbing fixture J. Is $ - $ - $ - $ 1,050.�0 $ 1,(}SO.QO $ 1,05fl.00 S - S - $ - $ - S - S - S - S - S - S - S - S - S - S - S - S - 5 - S - S - S - 5 - S - S - S - 5 - 5 - S $ $ S - 5 - S - 5 - S - 5 - 5 - S - S - S - � - S - S - 5 - S - S - S - 5 - 5 - S - S � S - S - S - S S - 5 - 5 - 5 - S - S S - S - 5 - 5 - 5 - S - 5 - S - S 5 - S - S - S - S - S - TOTALS $ - $ - $ - $ 42,854.50 S 42,854.50 Page 2