HomeMy WebLinkAboutR2010-094 2010-07-12RESOLUTION NO. R2010-94
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, APPROVING CHANGE ORDER NO. 1 ASSOCIATED WITH THE
ANIMAL CONTROL EXPANSION PROJECT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That Change Order No.1 associated with the Animal Control
Expansion Project, a copy of which is attached hereto as Exhibit "A" and made a part
hereof for all purposes, is hereby authorized and approved.
Section 2. That the City Manager or his designee is hereby authorized to execute
and the City Secretary to attest Change Order No. 1 associated with the Animal Control
Expansion Project,
PASSED, APPROVED and ADOPTED this the 12th day of July, A.D., 2010.
TOM REID
MAYOR
ATTEST:
APPROVED AS TO FORM:
AD6oAL4L, V/42 5,4_6A_
DARRIN M. COKER
CITY ATTORNEY
AQ
Exhibit "A"
Resoluti�n No. R2�10-��
C[�'�ic' OF PEARLAND
PR[7JECTS DEPARTi�iENT
35[9 Liber#y Driw�e, Suite 30U
�eartand, Texas T7581
w ww.cityofpe a r la�d.e o m/pro j e c ts
Far Peariand E�nimal Contro� & Adoption Cent+er
Date of Issuance: 7/12/2014 Chanae Urder No..
Cantract+�r: JC Stone�vall Cflsntructors, LP CoP Project �io.:
Desig�er: Jackson & Ryan Architec P.O. No.:
�HANGE ORDER.
E�planation:
This change �rder encompasses the followin�:
1
k`A07Q1
100742
Descriution of �Vork Cast 'Time
1 Replace interior kennel gates for runs in existing buildir3� $ 13,161.50 0 �ays
2 Repair of HVAC system in existing buildin� $ 3,442.00 Days
3 Repair or replace exhaust turbines in existing kennel (2} $ 4,? 15.00 Days
4 Replaee rusted door ancC frames (4) in existing buildin� � �,S�O.QO Days
Replace floors with VCT kile in reception area cak raoin, kitten
nursery, hallway, cat impound, �athroocns, shower rootn,
5 kitchen
Replace floors with VCT tile in 2nd addition (small hallway,
6 utili�y closet, supervisors office, afficer desk area)
7 Repair drywall dair�age at wall corners throughaut and large
$ Repiace baseboards throughout entire existinQ building
9 Paint eYisting kennel area y
10 Paiitt interiar building areas
11 Aepair/�owt masonry in specific areas of existing kennels
12 Cabinet for quarantine area in new addttion
I�eplace upper and lo�ver cabinet, backsplash and cc�untertop
13 at cat impound area
14 Replace sink plurnbing #ixture at cat i�n�ound area
IS Band
16 Insurance
17 Overhead & Profit
t S Extend contract time for items included in CQ # 1
Extend conlract tirne for tiine elapsed between substaniial
19 coinpletion and issuance of CO #1
$ 2,'912.�0
� 2,954.00
$ 425.00
$ 760.00
� 2,616.041
� 3,612.00
� �sa.00
$ 375.Ofl
$ 4,212.l10
$ 1,050.00
$ 857.09
$ �0.5b
$ 6,562.81
$ -
$
Days
Days
Days
Days
Days
Days
Da�s
Days
Days
Days
Days
Days
L3ays
30 Days
125 Days
P�ease attach bac�C-ua doc�mentation
C�st & Time Chanae Summa�
[}riginal Contraet:
Arevious Change Order(s):
Contract prior to this change ord�r;
Tdet increase {decrease} from this chan�e arder
Revised Co�trart:
Cost
$ 477,131.00
� -
� 47?,1 � L00
� 50,314.90
� sz�,abs.�o
Time
12Q Days
Days
120 Days
1�5 Days
275 Days
�C'onstruction l of2 Dla. Revised 7r48
Finance Approvai: �� (��, D�te: '�. ��� oZQ1 L�
�- �
ACCEPTED*: APPRC�VED:
B: Dake: �!� 2�/U By: � Dat�: �u� Y 1 2, 2 U 1 u
C ntractor Owner
Bill Eisen, City Manager
'Contraeto�° aerees [o p�rtonrt chan�elsl included in [f'tis ChanaL drdcr i`oe the pnce and tim� indicated. The prices for chanazs included all cost, assneiatzd
with dtiis Cltanee Order. 4
iVo 4vork is to b� eione until tkris r�l7�a�e urcier is exeeute�3. �+o paymesu c� t6�e Contra�tar{or Consultan�) shal� be �na�[e ti�r uc,rk rnclucic�l in th� chane� carder
unle] th� Conlr�ctor's pay estima[e is update�3.
Revise the prc�ject pl�ns rind �peciticatinns as rzf�renczd and insofar as the ori=irrtB prujtct dr3wings' an�l splciiications ar� inc�5nsisten[, this Change Ordrr
governs. Upan executiun t�y all pa�ties, [he follo�� ina clranges iden[itied for the contrac[ value �nd or contr�et time sfto+.va, are made pait of the contract.
C�nstruct'son ?�f? D19. Revised 7 08
.>. :._�: � _ v � ..� _
�C O�! S� R U C T O R 5
Phane:{713)660-8334
Fax: {713) 66�-7322
CP No.: Q18
'�itle: Misc work as per RFP 01
Project: FA 07�11
T0: HBLArchitecis
Att: Ms. Cara Davis
City of Pearland
A. �'otal Labor Cost $ -
LaborBurden $ -
B. Total Materiai Cost $ -
�Vlaterial Sales Tax $ -
C. Total Equiprnent Gost $ -
�quipmer�t Sales Tax $ -
D. Subcontractor Unit Cost $ 42,854.50
E. Bond $ $57.09
F. Insurance $ 40.50
Subtatal $ 43,752.09
G. Rllowable Over6�ead & Profit 15%
Total Change Propasal Cast
Time Extension in �ays (For This CP)
$ 6,552.$1
Change Order C� W\0 OH&P
$ 50,314.90 $ 42,854.50
3� 30
Description r�f work:
Additional Work as per RFP Ol
Contractor - 5ignature
Date
June
Approval - 5ignatur�e
�ate
Appraved As: (PBease Circle) CO No.: Amount Approved:
Change Order Allowance Aut�orization AA Na.:
CHANGEPRDPOSAL WORKSHEET
CP No.: 001
Cast Labor Total �abor Material T�tal �quip Total Equip Subeontractor Total Line Item
description af Work Vendor Qty Units Mat�rial 5ubtontractor
Code Unit Cost Cast Unit Cosc Unit Cost Cost Unit Cost Total
Cost Cost
S - S - S - $ - S -
Replacelnteriorgates American 22 $ - $ - $ - $ 598.25 $ 13,151.5D $ 13,151.5fl
Rep�ir HVAC existing bld 1 Is $ - $ - $ - $ 3,442.Dp S 3,442.a4 S 3,442.Ot3
ReRlace exhaust fans {2} 1 Is $ - $ - $ - $ 4,715AQ
$ 4,715A0 $ 4,715.04
Replace doors and frames 4 $ - $ - $ - $ 464.00 $ 1,$40.fl0 $ 1,840.t70
Insia�l VCT recp. 1 is 5 - 5 - 5 - 5 z, 912.00 $ z,9lz.oa $ a,9lz.oa
InstatlVC7 office 1 Is 5 - $ - $ - $ 2,954.00
$ 2,954.C?0 5 2,954.Q(}
Repair Qrywall I Is $ - $ - $ - $ 425.00 $ 425.00 $ 425,00
Base board thru-out 1 Is $ - $ - $ - $ 760A0 $ 76Q.p0 $ 760.U0
Paint Kennel 1 Is $ - $ - $ - $ 2,616.00
$ z,6�6.G0 $ �,6J6.Q0
Paint lnterior 1 Is $ - $ - $ - $ 3,612.00 $ 3,612.00 $ 3,6] �.40
Repair Masonryr 1 Is $ - $ - $ - $ 78p.Qp $ 780.00 $ 780.00
Cabinet for Quarantine 1 Is $ - $ - $ - $ 375.00 $ 375.00 $ 375,00
Ca6inets Breakroom 1 $ - $ - $ - $ 4,212.Da
$ 4,212.00 $ 4,212.40
Sink Plumbing fixture J. Is $ - $ - $ - $ 1,050.�0 $ 1,(}SO.QO $ 1,05fl.00
S - S - $ - $ - S -
S - S - S - S - S -
S - S - S - S - S -
S - 5 - S - S - S -
5 - S - S - S - 5 -
5 - S $ $ S -
5 - S - 5 - S - 5 -
5 - S - S - S - � -
S - S - 5 - S - S -
S - 5 - 5 - S - S �
S - S - S - S S -
5 - 5 - 5 - S - S
S - S - 5 - 5 - 5 -
S - 5 - S - S 5 -
S - S - S - S - S -
TOTALS $ - $ - $ - $ 42,854.50 S 42,854.50
Page 2