R2010-094 - 2010-07-12RESC7Ll�TION N�. R2010-94
A RESOLUTION OF THE CITY CO�1[+JC�L �UF THE �ITY OF PEARLAND,
TEXAS, APPR+DVING CHANG� OR�Ef; N�. 1 ASSOGIATED WITH T�IE
ANIMAL CONTRO'� EXPANSfC}N P�20JECT.
BE IT RESOLVED 'BY THE CITY CO�JNCIL OF THE CITY OF PEQRLAND, TEXAS:
Section 1. That Change Order No.1 associated with the Animal Contrc�l
Expansian Prc��ect, a capy of which is attached hereto as Exhibdt "A" and made a part
hereof for all purpc�ses, is here�y authorized and apprr�ved.
Sectior� 2. That the City Manager or his designee is hereby authorized to execute
and the Cify Secretary to attest Change Order No. 1 associated with tFre Anirnal Cc�ntrol
Expansion Project.
PASSEQ, APf'RQVED and ADOPTED this the 12� day af �uly, A.D., 2010.
��?'M �
TQM REIp
NIAYOR
ATTEST:
. r :,=�;�ARt,q;y�•,,
: `c34�"� '_ �"`=
�/ �-+ �-+ ;>,' :X�
1 . V � �.U, I . li � ?t :�_
C S� TARY ;�''. '�`'=
APPROV�ED ,�,S T� FC)R'Nl; '""'
,� l`J�; �� • �� '
DARRIN M. COKER
CITY ATTORN�Y
Exhibit "A"
Resoluti�n No. R2�10-��
C[�'�ic' OF PEARLAND
PR[7JECTS DEPARTi�iENT
35[9 Liber#y Driw�e, Suite 30U
�eartand, Texas T7581
w ww.cityofpe a r la�d.e o m/pro j e c ts
Far Peariand E�nimal Contro� & Adoption Cent+er
Date of Issuance: 7/12/2014 Chanae Urder No..
Cantract+�r: JC Stone�vall Cflsntructors, LP CoP Project �io.:
Desig�er: Jackson & Ryan Architec P.O. No.:
�HANGE ORDER.
E�planation:
This change �rder encompasses the followin�:
1
k`A07Q1
100742
Descriution of �Vork Cast 'Time
1 Replace interior kennel gates for runs in existing buildir3� $ 13,161.50 0 �ays
2 Repair of HVAC system in existing buildin� $ 3,442.00 Days
3 Repair or replace exhaust turbines in existing kennel (2} $ 4,? 15.00 Days
4 Replaee rusted door ancC frames (4) in existing buildin� � �,S�O.QO Days
Replace floors with VCT kile in reception area cak raoin, kitten
nursery, hallway, cat impound, �athroocns, shower rootn,
5 kitchen
Replace floors with VCT tile in 2nd addition (small hallway,
6 utili�y closet, supervisors office, afficer desk area)
7 Repair drywall dair�age at wall corners throughaut and large
$ Repiace baseboards throughout entire existinQ building
9 Paint eYisting kennel area y
10 Paiitt interiar building areas
11 Aepair/�owt masonry in specific areas of existing kennels
12 Cabinet for quarantine area in new addttion
I�eplace upper and lo�ver cabinet, backsplash and cc�untertop
13 at cat impound area
14 Replace sink plurnbing #ixture at cat i�n�ound area
IS Band
16 Insurance
17 Overhead & Profit
t S Extend contract time for items included in CQ # 1
Extend conlract tirne for tiine elapsed between substaniial
19 coinpletion and issuance of CO #1
$ 2,'912.�0
� 2,954.00
$ 425.00
$ 760.00
� 2,616.041
� 3,612.00
� �sa.00
$ 375.Ofl
$ 4,212.l10
$ 1,050.00
$ 857.09
$ �0.5b
$ 6,562.81
$ -
$
Days
Days
Days
Days
Days
Days
Da�s
Days
Days
Days
Days
Days
L3ays
30 Days
125 Days
P�ease attach bac�C-ua doc�mentation
C�st & Time Chanae Summa�
[}riginal Contraet:
Arevious Change Order(s):
Contract prior to this change ord�r;
Tdet increase {decrease} from this chan�e arder
Revised Co�trart:
Cost
$ 477,131.00
� -
� 47?,1 � L00
� 50,314.90
� sz�,abs.�o
Time
12Q Days
Days
120 Days
1�5 Days
275 Days
�C'onstruction l of2 Dla. Revised 7r48
Finance Approvai: �� (��, D�te: '�. ��� oZQ1 L�
�- �
ACCEPTED*: APPRC�VED:
B: Dake: �!� 2�/U By: � Dat�: �u� Y 1 2, 2 U 1 u
C ntractor Owner
Bill Eisen, City Manager
'Contraeto�° aerees [o p�rtonrt chan�elsl included in [f'tis ChanaL drdcr i`oe the pnce and tim� indicated. The prices for chanazs included all cost, assneiatzd
with dtiis Cltanee Order. 4
iVo 4vork is to b� eione until tkris r�l7�a�e urcier is exeeute�3. �+o paymesu c� t6�e Contra�tar{or Consultan�) shal� be �na�[e ti�r uc,rk rnclucic�l in th� chane� carder
unle] th� Conlr�ctor's pay estima[e is update�3.
Revise the prc�ject pl�ns rind �peciticatinns as rzf�renczd and insofar as the ori=irrtB prujtct dr3wings' an�l splciiications ar� inc�5nsisten[, this Change Ordrr
governs. Upan executiun t�y all pa�ties, [he follo�� ina clranges iden[itied for the contrac[ value �nd or contr�et time sfto+.va, are made pait of the contract.
C�nstruct'son ?�f? D19. Revised 7 08
.>. :._�: � _ v � ..� _
�C O�! S� R U C T O R 5
Phane:{713)660-8334
Fax: {713) 66�-7322
CP No.: Q18
'�itle: Misc work as per RFP 01
Project: FA 07�11
T0: HBLArchitecis
Att: Ms. Cara Davis
City of Pearland
A. �'otal Labor Cost $ -
LaborBurden $ -
B. Total Materiai Cost $ -
�Vlaterial Sales Tax $ -
C. Total Equiprnent Gost $ -
�quipmer�t Sales Tax $ -
D. Subcontractor Unit Cost $ 42,854.50
E. Bond $ $57.09
F. Insurance $ 40.50
Subtatal $ 43,752.09
G. Rllowable Over6�ead & Profit 15%
Total Change Propasal Cast
Time Extension in �ays (For This CP)
$ 6,552.$1
Change Order C� W\0 OH&P
$ 50,314.90 $ 42,854.50
3� 30
Description r�f work:
Additional Work as per RFP Ol
Contractor - 5ignature
Date
June
Approval - 5ignatur�e
�ate
Appraved As: (PBease Circle) CO No.: Amount Approved:
Change Order Allowance Aut�orization AA Na.:
CHANGEPRDPOSAL WORKSHEET
CP No.: 001
Cast Labor Total �abor Material T�tal �quip Total Equip Subeontractor Total Line Item
description af Work Vendor Qty Units Mat�rial 5ubtontractor
Code Unit Cost Cast Unit Cosc Unit Cost Cost Unit Cost Total
Cost Cost
S - S - S - $ - S -
Replacelnteriorgates American 22 $ - $ - $ - $ 598.25 $ 13,151.5D $ 13,151.5fl
Rep�ir HVAC existing bld 1 Is $ - $ - $ - $ 3,442.Dp S 3,442.a4 S 3,442.Ot3
ReRlace exhaust fans {2} 1 Is $ - $ - $ - $ 4,715AQ
$ 4,715A0 $ 4,715.04
Replace doors and frames 4 $ - $ - $ - $ 464.00 $ 1,$40.fl0 $ 1,840.t70
Insia�l VCT recp. 1 is 5 - 5 - 5 - 5 z, 912.00 $ z,9lz.oa $ a,9lz.oa
InstatlVC7 office 1 Is 5 - $ - $ - $ 2,954.00
$ 2,954.C?0 5 2,954.Q(}
Repair Qrywall I Is $ - $ - $ - $ 425.00 $ 425.00 $ 425,00
Base board thru-out 1 Is $ - $ - $ - $ 760A0 $ 76Q.p0 $ 760.U0
Paint Kennel 1 Is $ - $ - $ - $ 2,616.00
$ z,6�6.G0 $ �,6J6.Q0
Paint lnterior 1 Is $ - $ - $ - $ 3,612.00 $ 3,612.00 $ 3,6] �.40
Repair Masonryr 1 Is $ - $ - $ - $ 78p.Qp $ 780.00 $ 780.00
Cabinet for Quarantine 1 Is $ - $ - $ - $ 375.00 $ 375.00 $ 375,00
Ca6inets Breakroom 1 $ - $ - $ - $ 4,212.Da
$ 4,212.00 $ 4,212.40
Sink Plumbing fixture J. Is $ - $ - $ - $ 1,050.�0 $ 1,(}SO.QO $ 1,05fl.00
S - S - $ - $ - S -
S - S - S - S - S -
S - S - S - S - S -
S - 5 - S - S - S -
5 - S - S - S - 5 -
5 - S $ $ S -
5 - S - 5 - S - 5 -
5 - S - S - S - � -
S - S - 5 - S - S -
S - 5 - 5 - S - S �
S - S - S - S S -
5 - 5 - 5 - S - S
S - S - 5 - 5 - 5 -
S - 5 - S - S 5 -
S - S - S - S - S -
TOTALS $ - $ - $ - $ 42,854.50 S 42,854.50
Page 2