Loading...
R2010-055 - 2010-04-26 RESOLUTION NO. R2010 -55 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE CITY'S FUTURE RESERVOIR. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with the Future Reservoir Side Slope Project, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to Haddock Construction, Inc. in the amount of $1,585,307.00. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the Future Reservoir Side Slope Project. PASSED, APPROVED and ADOPTED this the 26 day of April, A.D., 2010. TOM REID MAYOR ATTEST: Y o NG FI C v. j SE ETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY SNOWDEN ENGINEERING, INC. . 521.Westminster Pearland Texas 77581 Phone;,(281)48 -2028 Fax (281)485-5473 E-Mail: sno*enginc@sbcg1913alsiet April 14, 20.10 Mr. Trent Epperson Projects Director City of,Pearland 3519 Liberty Drive •Pearland, Texas 77581 'RE:- Competitive Sealed.Proposals Recommendation for City of Pearland's Interim Side Slope Construction of Future Reservoir Project Dear.Mr. Epperson, Competitive Sealed Proposals for the City of Pearland's interim Side Slope Construction of Future Reservoir Project, COP PN:WA-0812, Bid No.0110-18 were received and opened on Thursday, March 4, 2010 at 2 00 PM. There were a total of three(3) General Contractors that submitted , _ proposals for this Project. There were no significant discrepancies found in the Proposals submitted. In strict compliance with the Texas Local Government Code, Chapter 271, Purchasing ,and • Contracting and House Bill 1886,the Contractor's Proposals and Qualifications were evaluated and graded in accordance with'the Selection Criteria'that was specifically listed in Section 00202, Exhibit A,Instructions to Bidders of the Project Specifications. This Selection Criteria was reviewed and evaluated by a:committee-of City of Pearland Staff and Design Consultants. The three (3) Proposers references'and quelifications were each eveluated_and rated, The Proposal that received the highest evaluation rating and that the Committee determined was the'Best Value"for the City of Pearland on this Project was submitted by Haddock Construction CoMpariy, Inc. of Pearland, Texas. In addition to the Evaluation Rating Process, the Selection Committee has performed a rigorous effort of negotiations with Haddock Construction Company, Inc. In accordance.with guidelines allowed by the Texas Local Government Code. The Committee looked at several cost savings proposals from Haddock Construction Company that could be considered without changing the overall web,/ of the project. It is the recommendation of Snowden Engineering, Inc. that the City of Pearland.enter into a contract with Haddock Construction Company, Inc for construction of the Interim Side Slope Construction of Future Reservoir-Project for the amount of$1,585,307.00. This Contract amount includes the Base Proposal and the alternative of constructing:the remainder of the reservoir's side Slopes for an edditionel 6700,000.00. • Considting Engineers&Surveyors ° April 14, 2010 Page 2 A copy of the Bid Tabulation Sheet is also enclosed. Thank you for your assistance and we appreciate the opportunity to work with the City of Pearland on such an Important Project If you have any questions or need any additional information,please do not hesitate to contact me Sincerely, gr"-,Pt. Dr. James D. Snowden, P.E., R.P.L.S. President cc: Mrs. Teresa Battenfield, City of Pearland i Enclosure • Interim Side Slope Construction of Future Reservoir BID TABULATION March 10, 2010 Haddock Consturction Co., Inc. Double Oak Construction, Inc. Triple B Services, L.L.P. Engineer's Est'd Estimated Unit Bid Item Description Unit Quantity Unit Price Amount Bid Unit Price Amount Bid Unit Price Amount Bid Price BASE BID ITEMS on(Limit of 3%of Total Bid) LS 1 $0.00 $0.00 $35,000.00 $35,000.00 $35,000.00 $35,000.00 $25,000.00 LS 1 $0.00 $0.00 $5,000.00 $5,000.00 $25,000.00 $25,000.00 $7,500.00 ntrol&Regulation LS 1 $0.00 $0.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $15,000.00 aration AC 2 $3,000.00 $6,300.00 $998.00 $2,095.80 $5,000.00 $10,500.00 $10,000.00 d Filter Fabric Barrier LF 2,000 $3.00 $6,000.00 $1.75 $3,500.00 $1.25 $2,500.00 $4.00 EARTHWORKS sent Materials LS 1 $600,000.00 $600,000.00 $993,835.00 $993,835.00 $1,230,000.00 $1,230,000.00 $1,530,000.00 on LS 1 $225,000.00 $225,000.00 $425,929.00 $425,929.00 $434,000.00 $434,000.00 $306,000.00 EXTRA ITEMS ch AC 2 $1,500.00 $3,000.00 $1,700.00 $3,400.00 $1,700.00 $3,400.00 $1,300.00 stabilized Sand CY 500 $20.00 $10,000.00 $24.00 $12,000.00 $24.00 $12,000.00 $30.00 Ground Water LF 2,100 $16.67 $35,007.00 $30.00 $63,000.00 $30.00 $63,000.00 $20.00 TOTAL BID PRICE $855,307.00 $1,548,759.80 $1,825,400.00 WA0812-Interim Side Slope Construction of Future Reservoir Competitive Sealed Proposal Evaluation Summary March 25,2010 Triple B Haddock Double Oak • Criteria Source Scoring Procedure Score Factor Total Services Construction Construction 1 Base Proposal Proposal Offeror to submit their Competitive Sealed 50 1 50 23 50 28 Option AI1> Form Proposals on the forms included in the Project 22 47 50 Option Bt21 Manual.If alternates are proposed,mark-up base-bid with reduction to base bid amount for proposed alternates. Low Price=50 pts. For subsequent Offeror's,the low Offeror price shall be divided by the Subsequent Offeror's price to get a percentage(factor)that is multiplied by the score to get the total. 2 Project Proposal The Project Plan or Approach proposed: 25 1 25 0 16.6 11.4 Approach Information a.Quality and clarity of Offeror's workplan; b.Offeror's sequencing of work; c.Offeror's schedule; d.Offeror's source of material. Responses are scored as follows: Excellent=25 pts;Very Good=20 pts; Average=15 pts;Fair=10 pts;Poor=0 pts. 3 Past References, City of Pearland Officials are asked to rate the 25 1 25 12.8 21.8 15.2 Relationship Qualification contractor. with City of Statement Responses are scored as follows: Pearland Excellent=5 pts;Very Good=4 pts; Average=2 pts;Fair=1 pts;Poor/No past relationship=0 pts. Points for multiple references are averaged. Offeror will be evaluated on the following: a. Reputation; b. Demonstrated knowledge of local conditions; c. Assigned Project Manager. Responses are scored as follows: Reputation: Excellent=5 pts;Very Good=4 pts; Average=2 pts;Fair=1 pts;Poor=0 pts. Demonstrated knowledge of local conditions: Excellent=10 pts;Very Good=8 pts; Average=5 pts;Fair=2 pts;Poor=0 pts. Assigned Project Manager. Excellent=5 pts;Very Good=4 pts; Average=2 pts;Fair=1 pts;Poor=0 pts. Total Possible Score(3) 100 100 35.8 88.4 54.6 Option A11t 100 100 34.8 85.4 76.6 Option Bt2y Notes: • 1.Option A uses bid amounts as written in proposal to determine scores for item 1. 2.Option B uses Double Oak Construction written in bid reduction to determine scores for item 1. 3.Scores rounded to Interger value. March 4, 2010 PROJECT APPROACH A: Sequencing of work 1. Remove existing pump in the pit and replace this pump with a larger pump. (The city will continue to pay for the electricity to operate the pump.) la. This process will take approximately 5 days 2. While the water level is coming down we will remove the exposed sand at the bottom of the hole on the northeast and southeast sides (This sand will become the property of Haddock Construction). The purpose of this removal is to allow the clay cap to tie to a clay bottom so that an impermeable seal is created. 2a. This process will take approximately 20 days 3. Once the sand is removed, we have to muck out the bottom and exposed the clay. Then we will start excavating the clay in the southern corner and start placing the clay on the slope. • 3a. This process will take approximately 10 days 4. Then we start the fill process from the bottom to the top, placing the clay in compacted lifts all the way to top. • 4a. This process will take approximately take 115 days B: Source of Material There is enough clay in the southeast corner to complete the slope from station 33.+00 to station 11+00. The.additional clay needed to complete the remainder of the sloping is in the bottom of the pit and currently under water. If this material can be dried to the correct moisture levels to allow for proper compaction, then it can be used. If this can not be achieved, the remainder of clay will come from off site. Haddock Construction Company, Inc. Page 1 Additional Proposal In addition,we also feel that it is of equal importance to complete the west and north slopes as well as the remainder of the eastern wall. The majority of clay exists on these slopes; however, a large amount of clay is still needed to achieve the proper 3 to 1 slope. In this geographic area, the water currently flows freely within the sand strata. In the abandoned pit to the north, pumps have been off for over a year and the water elevation has risen 10 to 15 feet higher than in this pit. Multiple large pumps were simultaneously used in this pit as well as the abandoned pit over a very long period of time to bring the water table down to where it is today. The water table at this time is manageable;however, it is on the rise in the abandoned sandpit to the north. If the sloping of the remaining walls is left to be done at a later date,there is a very good chance that it will be almost impossible to get the water table down. This will create massive problems in sealing off the entire hole at a later date. In my opinion it is at the city's best interest to complete the slope work in full while the water is still manageable. Therefore, if the slopes were properly completed around the entire perimeter of the hole,this would stop the water flow into the hole. We will complete the remaining slopes for an additional charge of$700,000.00 using the same construction methods used on the other slopes. This will take an additional 90 working days to complete. Haddock Construction Company, Inc. Page 2 GENERAL. / CONTRACTORS! HADDOCK CONSTRUCTION CO. UTILITY • SITE WORK • PAVING Teresa Battenfield, P.E. Assistant Director Projects Department City of.Pearland 3519 Liberty Drive Pearland, TX 77581 Re: Interim Side Slope Construction of Future Reservoir Bid No.: 0110-18 Dear Ms. Battenfield: This letter will provide clarification regarding the alternate proposal submitted to the City of Pearland with our bid for the construction of the Interim Side Slope Construction of Future Reservoir project on March 4, 2010. 1. We intend to use the clay in the bottom of the hole to do all of the slope work. However, if additional clay is required, the alternate proposal includes 50,000 truck yards of clay to be obtained from another source. If more than 50,000 truck yards of clay are required to be:imported,•then an.additional charge shall be $65.00 a truck load or$5.41 a truck yard. At this time, I do not anticipate the need for additional clay. 2. The alternate proposal.submitted with the bid included an additional 90 working days to complete. You requested the time.in calendar days instead of working days. This additional proposal will add an additional 150 calendar days to the contract for completion. Therefore, the construction will be Substantially Complete within 300.days after the date of the notice to commence work. Please let me know if you need additional information. Very truly yours, Mark Haddock President Haddock Construction Co., Inc. P.D.Box 1263,Friendswood,TX 77549 • 3720'C:R.48.Rosharon,Texas 77583 Phone 281-489-2828 Fax 281=489-2888