Loading...
R2003-0184 12-15-03RESOLUTION NO. R2003-'184 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING WORK AUTHORIZATION #10 SUPPLEMENT #5 FOR ENGINEERING AND SURVEYING SERVICES ASSOCIATED WITH THE PEARLAND MOBILITY AND DRAINAGE BOND PROGRAM (YOST ROAD PROJECT). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and Turner, Collie and Braden, Inc., ("T C & B) for Program Management of the Pearland Mobility and Drainage Bond Program was authorized by the City Council on December 10, 2001. Section 2. That T C & B has developed work authorization #10 Supplement #5, which is attached hereto as Exhibit "A". Section 3. That work authorization #10 Supplement fl5 for engineering and surveying services associated with the Yost Road Project is hereby approved. PASSED, APPROVED and ADOPTED this the 8th dayof December' A.D., 2003. ATTEST: Yi~yN G L/(21'~G SEC,~ETARY ~" APPROVED AS TO FORM: TOM REID MAYOR DARRIN M. COKER CITY ATTORNEY ATTACHMENT D WORK AUTHORIZATION NO. 10 SUPPLEMENT NO. 5 Exhibit "A" Resolution No. R2003-184 This Work Authorization is made pursuant to the terms and conditions of the Pearland Mobility & Drainage Bond Program, hereinafter identified as the "Contract," entered into by and between the City of Pearland ("City"), and Turner Collie & Braden Inc. ("Engineer). PART 1. Work Authorization No. 10 is related to the improvement of Yost Boulevard from Broadway (FM 518) to Clear Creek. The Engineer will perform Engineering Design Services, Topographic Survey and ROW Survey under this Authorization. PART 2. The maximum amount payable for services under this Work Authorization, Supplement No. 5 is $27,895.67. This amount is based on the attached fee proposals submitted by: J.F. Thompson, Inc., dated November 25, 2003 in the amount of $27,895.67. PART 3. Payment to the Engineer for the services established under this Work Authorization shall be "Lump Sum." PART 4. This Work Authorization shall become effective on December 9, 2003 and shall terminate on November 12, 2005, unless extended by a supplemental work authorization. PART 5. This Work Authorization does not waive the parties' responsibilities and obligations provided under the contract. PART 6. This Work Authorization is hereby accepted and acknowledged below. ENGINEER By: By:.__ CITY OF PEARLAND Typed or Printed Name Bill Eisen Typed or Printed Name LIST OF EXHIBITS Exhibit A - Fee Schedule Exhibit B - Work Schedule ~//¢& ~.f'lJ~ ~ City Manager Title Title / 2--/2'~_2~ ,2.-°i-03 Date Date Turner Collie Braden Inc. 11/25/2003 EXHIBIT A FEE SCHEDULE Pearland Mobility & Drainage Bond Program Work Authorization No. 10 Supplement No. 5 Summary Project Yost Boulevard En.qineering Services Hydrologic & Hydraulic Thompson Environmental Compliance Berg Oliver Cultural Resources Ber~ Oliver 404 Permit Berg Oliver Topographic Survey Thompson FM 518 Intersection Thompson Sleepy Hollow Park Site Thompson Geotech Terra-Mar ROW Maps & Documents Thompson FM 518 Intersection Thompson Sleepy Hollow CuI-Du-Sac Thompson Abstracting Thompson PS & E Thompson Traffic Control Thompson SWPPP Thompson Traffic Signals & Landscape Thompson Reimbursable Expenses Thompson FM 518 Intersection Thompson Sleepy HollowCul-Du-Sac Thompson Sleepy Hollow Park Site Thompson ROW Acquisition Assistance Contract Land Stasff Materials Testing Subtotal Totalto Date Previous Authorization $ 54,057.00 $ 28,000.00 $ 6,300.00 $ 3,250.00 $ 39,400.O0 $ 5,155.00 $ 4,315.00 $ 4,275.00 $ 52,800.00 $ 2,040.00 $ 2,175.00 $ 2,296.00 $ 216,710.00 $ 44,503.00 $ 11,790.00 $ 28,123.00 $ 7,617.00 $ 7,251.00 $ 3,814.00 $ 5,181.00 $ 118,000.00 $ - $ 647,052.00 Current Authorization 4,241.60 12,654.07 11,000.00 - - - - $ 27,895.67 $674,947.67 Page 1 of 1 li/~/u~ TUE 10:18 FAX 71~85641Z1 J.F. TIt0~P$0N, INC. ~002 " ...... Yost Boulevard,*" '. .... ...... ' ' . : .... 'i ' . , ' ' ' '" " :' : ,' " ': ':*, '" '*' ' .Fee' PropoSal. Amendment:.Two'"'summary -' '. ,",".'": . ,',", ,"'.". 'J.F..Th0'mps0n;,In:ci, :" . .. -,,'"." . ', :... :.':"." .,.'.", .' ..',: ...'.. No~embe, r,:25; '2003,",' ".. ' 1. Realigr{m®nt of Roadway Engineering Right-Of-Way Traffic Signal Total $12,6S4,07i $4,241,60! $11,000.00~ · l.[/~o/O0 'I'UE 10:18 ~'AX 71~§4121 J.F. T~IOMP$ON. INC. ~003 Z I,U I... Z ILl Z Z · 11/25/00 TUE 10:20 FAX 7139554121 J.F. TIt0~PSON, INC. ~004 November 25, 2003 SUPPLEMENTAL AMENDMENT No. 2 SURVEY SCOPE OF SERVICES PROJECT: PROJECT LIMITS: PROJECT SCOPE: Yost Boulevard From FM 518 to Clear Creek, Brazoria County, Texas Provide land surveying and mapping serVices as noted below UNDERSTANDING OF PROJECT: It is our understanding that the requested land surveying and mapping services to be performed by J.F. Thompson, Inc. (Thompson) will be utilized for the acquisition of right of way for the future re-alignment of Yost Boulevard connection with Shady. Crest Drive at the intersection of FM 518. The work will involve preparation of survey acquisition ' documents on three parcels of land, All survey work tasks shall be performed and prepared in strict compliance with City of Pearland guidelines, Texas Board of Professional Land Surveying and the Texas Society of Professional Surveying Manual of Practice, Category 1 B, Condition 2, Standard Land Survey, ~ ,SURVEY PHASE SER,,VICE~: TASK TAKE 1 - PREPARE NEW ROW AC. QUISITION DOCUMENT FOR THE'JOHN YOST PARCEL: At the request of T,C. & B and the city of Pearland, the surveyor shall prepare ........ ROW acquisition documents for additional right of way take pamel on the John Yost tract in order to reflect the revised street and right of way geometrics at the FM 518 intersection and connection to Shady Crest Drive. TA~;K 2 - PREPARE NEW ROW ACQUISITION DOCUMENT FOR THE' SHADY CREST DRIVE CORNER CLIP PARCEL ON SOUTHSIDE OF INTERSECTION: · At the request of T.C. & B and the city of Peadand, the surveyor shall prepare ROW acquisition documents for additional right of way involving a corner clip. parcel located on the southeast corner of Shady Crest Drive & FM 518. TASK 3 - PREPARE NEW ROW ACQUISITION DOCUMENT FOR THE SHADY CR. EST DRIVE CORNER...CLIP PARCEL ON SOUTHSIDE OF INTERSECTION: At the request of T.C. & B and the city of Pearland, .the surveyor shall prepare ROW acquisition documents for additional right of way involving a corner clip parcel located on the southwest corner of Shady Crest Drive & FM 518. C~\Document~ and Settlng~billoV~ocel Setting~XTemporary i~er~et FEe.~\OLE$2~3~.2 Sur~¢y$cope. doc 0 0 November 24, 2003 TEDSI INFRASTRUCTURE GROUP Con,vulrlng £ng~n~ers 10260 We~thelmer · Suite 460, Hou~tort, Tex~ 77012 Mr. David Kubala, P,E. J.F. Thompson, Inc. 6110 Clarks~3n Lane Houston, Texas 77055 Supplemental Proposal for Traffic Engineerfng Services Realignment of FM 518 at Yosf Boulevard Dear MI'. Kubala: In response to your request, TEDSI Infrastructure Group (TEDSI) is pleased to submit a supplemental proposal for traffic engineering services in reference to the above captioned project. Attached please find a Scope of Services and associated fees for the design of traffic related items for ttle above referenced project, The scope is · revised to inolude one (1) task, 1) Task A: Permanent Traffic Signal Design. Schedule The schedule for completing the services defined in the soope of work shall be coordinated with &F, Thompson, Inc. upon receiving a written notice to proceed. The estimate for completion of work silall be' c6ntingent upon the availability of required information. CondiUon.8. TEDS1 shall perform' its duties aa reasonably required to accomplish the work as described herein. The services provided for this Project apply only to this specific Project and may not be used for any other project. Information supplied by J.F. Thompson. inc. is represented to be accurate and J.F. Thompson, Inc. acknowledge8 that TEDSI is relying upon such information in its quotation, acceptance and performance of the Project. This proposal does not in any way constitute a valid contract. A legal supplemental agreement to the existing subcontract specifying explicit terms and conditions between TEDSI and J.F. Thompson, Inc. shall be executed prior to commencement of work. Te1:713~)75-8337 * ~ , Fax,: ?13/975-'7194 Page Two The total lump sum fee for the Traffic Engineering Services as identified in Scope of Work is set at $11,000.00 for Task A. Invoices shall be rendered monthly either as a final or partial billing, based on percent complete and shall be payable in accordance with the terms and conditions set forth in the legal sub-contmot agreement. Any invoice not received within the time period mutually agreed upon by J.F. Thompson, Inc. and TEDSi shall be considered dellllquent. TEDSI may ten~inate all work activities until delinquent payment Is received. Thank you for the opportunity to provide ttlis proposal to J.F. Thompson, Inc.. We can assure you of our personal service, firm commitment and timely response. Should you have any quesfio~ts please feel f~ee to call. Sincerely, TleDSI INFRASTRUCTURE GROUP Paul F. English Principal Project Manager Enclosure ~_~,C,~ OF SERVICE8 PM 518 at Yost Boulevard) SUPPLEMENTAL ATTACHMENT "A" SCOPE OF SERVICES for Realignment of FM 518 at Yost Boulevard The Design Services and associated fees are based on the following items; JF. Thompson, Inc. (JFT) witl obtain all necessary approvals and signatures from utility companies. JFT will provide TEDSI with all required topographic survey and I'oadway design drawings, In<;luding utility Information (public and private) and property survey required for this project. All information shall be provided in a levelized AutoCAD or Microstation CADD format. · TEDSI shall design and prepare construction drawings for the permanent traffic signal for this project based on the realignment of Yost Boulevard at FM 518. All d~slgn work will be coordinated with the appropriate agencies and TEDSI will obtain all required approvals from TxDOT for the signal system. TEDS1 shall utilize ';he following layouts previously prepared by TEDS1 for the 90% submiffal: . Existing Signal Layout · Overhead Street Name Sign Details (for FM 518 sign and Yost Blvd. Sign). Ta~k A - Permanent Tr~fflc 8il~nal Desien TEDSI infrastructure Group (TEDSI) shall design plans and details for the requlred installation of a permanent traffi~ signal system and related improvements for the realigned intersection of FM 518 at Yost Boulevard, as required by the Texas Department of Transportation (TxDO'I'). The permanent traffic signal layout shall be designed in conformance with TxDOT Houston District requirements. This work sc~ope provides for e mast arm pole configuration. Safety lighting on traffic signal poles along with vehicle detection will be included in the signal design. All required specifications, general construction notes and estimates will be included. Plan layouts shall be prepared in English units at 1"'-20' scale full-size or 1"=40' scale, half-size drawings. Construction .cost ,for this I~ersection is estimated at $105,000.00. Tlqe Permanent traffic signal platte shall consist of the following new and/or revised drawings for the Intersection: · Existing Signal Layout (from 90% design) Plan Layout (proposed traffic Signal with safety lighting) Ele~:trical Schedule (cables, conduits, etc,) Revised Basis of Estimate TEDSI INFRASTRUCTURE GROUP Page 1 of 2 November 24, 2003 ~ll/ZS/0~ ?UE 10:gl FA~ 7139554121 J.F, THOHP$0N, INC. ~009 S_~OPE OF SERVICES FM ,~18 at Yost Boulev, ard). Revieed General Notes · New Overhead Street Name Sign Detail for "Shadycrest" · Overhead Street Name Sign Details (for FM 518 sign and Yost Blvd. sign from gO% c~esign) · Standard Detail Drawings The Total Lump Sum Fee for providing the services aa eleaoribed above (Traffic Signal Design) is $~ 1,0OO.OO, NOTE: This scope of work by TEDSI doea not include the following: Traffic Data Collection, Traffic Studies, Optimized Signal Timing Plans, Signing and Pavement Marking Design, Roadway Illumination Design, Temporary Traffic Signals or Traffic Control During Construction, TEDS1 INFRASTRUCTURE GRouP Page 2 of 2 November 24, 2003