R2003-0127 09-08-03RESOLUTION NO. R2003-127 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING WORK AUTHORIZATION #3 SUPPLEMENT #7 FOR ENGINEERING DESIGN SERVICES ASSOCIATED WITH THE PEARLAND MOBILITY AND DRAINAGE BOND PROGRAM (WEST MARY'S CREEK DETENTION PROJECT). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and Turner, Collie and Braden, Inc., ("T C & B) for Program Management of the Pearland Mobility and Drainage Bond Program was authorized by the City Council on December 10, 2001. Section 2. That T C & B has developed work authorization #3 Supplement #7, which is attached hereto as Exhibit "A". Section 3. That work authorization #3 Supplement #7 for engineering design services associated with the West Mary's Creek Detention Project is hereby approved. PASSED, APPROVED and ADOPTED this the 8th dayof September A.D., 2003. ATTEST: APPROVED AS TO FORM: MAYOR DARRIN M. COKER CITY ATTORNEY ATTACHMENT D WORK AUTHORIZATION NO. 3 SUPPLEMENT NO. 7 Exhibit "A" Resolution No. R2003-127 This Work Authorization is made pursuant to the terms and conditions of the Pearland Mobility & Drainage Bond Program, hereinafter identified as the "Contract", entered into by and between the City of Pearland ("City"), and Turner Collie & Braden Inc. ("Engineer). PART 1. Work Authorization No. 3 is related to West Mary's Creek Detention Facility. The Engineer will perform Design Services under this Authorization. PART 2. The maximum amount payable for services under this Work Authorization No. 3, Supplement No. 7 is $288,324.00. This amount is based on the attached fee proposal submitted by Dannenbaum Engineering Corporation dated August 27, 2003. PART 3. Payment to the Engineer for the services established under this Work Authorization Supplement No. 7 shall be "Lump Sum". PART 4. This Work Authorization No.3 Supplement No. 7 shall become effective on September 9, 2003 and shall terminate on November 12, 2005, unless extended by a supplemental work authorization. PART 5. This Work Authorization does not waive the parties' responsibilities and obligations provided under the contract. PART 6. This Work Authorization is hereby accepted and acknowledged below. ENGINEER By: ET~~l 51'~,~~_~ By: CITY OF PEARLAND Frank S. Marino, P.E. Bill Eisen Typed or Printed Name Typed or Printed Name Senior Vice President Title September 15, 2003 Date LIST OF EXHIBITS Exhibit A - Fee Schedule Exhibit B - Work Schedule Cit_v Manager Title September 8, 2003 Date Turn~'r Collie Br~den Inc. 8/27/2003 EXHIBIT A FEE SCHEDULE Pearland Mobility & Drainage Bond Program Work Authorization No. 3 SUPPLEMENT No. 7 Summary Project West Mary's Creek Detention Facility Engineering Services Hydrologic & Hydraulic Environmental Compliance Topographic Survey Geotech Hydrocarbon & salt testing TRRC testing ROW Maps & Documents PS&E Basic Design Services Bid/Construction Phase SWPP 25-Year Detention Pond Analysis Direct Costs ROW Acquisition Assistance Construction Materials Testing Subtotal Total to Date Dannenbaun Engineering Quadrant JNS Consulting Engineers QC Laboratories QC Laboratories JNS Consulting Engineers Dannenbaun Engineering Dannenbaun Engineering Dannenbaun Engineering Dannenbaun Engineering Dannenbaun Engineering Crosslands Previous Authorization $27,120.00 $28,750.00 $11,980.00 $5,455.00 $ 4,053.00 $ 12,000.00 $17,860.00 $0.00 $o.oo $o.oo $o.oo $o.oo $23,300.00 $o.oo $130,518.00 Current Authorization $ 258,884.00 $ 12,000.00 $ 8,084.00 $ 5,156.00 $ 4,200.00 $ $ $288,324.00 $418,842.00 Page 1 of 1 November 11, 2002 Revised March 25, 2003 Revised August 27, 2003 Revised August 27, 2003 Mr. Jim Keller, P.E. Turner, Collie and Braden, Inc. Manager - Pearland Mobility and Drainage Bond Program 5757 Woodway Houston, Texas 77057 Proposal for Engineering Services Design, Bid, and Construction Phase Services for the Construction of West Mary's Creek Detention Ponds Dear Mr. Keller: Dannenbaum Engineering Corporation (DEC) is pleased to submit this proposal for providing engineering services for the development of construction drawings for the construction of detention ponds along Mary's Creek in Pearland Texas. This project scope includes the preparation of construction drawings based on the results of the hydraulic analysis done by DEC. This work includes the development of construction drawings for two detention ponds, a drainage channel, special side-weir inlet structure, outlet structure, cross-culvert, and pump station. The pump station is required to pump water volumes between the flowline elevation of Mary's Creek (approximately 40-fi) and the permanent water elevation in the detention pond (35-ft). Pump requirements are based on pumping this 5-ft deep volume (approximately 7.3 million cubic feet) in 48-hours. This pump rate is approximately 19,000 gpm. Options include the design of low head screw pumps or turbine pumps. DEC will also be available to answer questions, and provide additional information during the Bid and Construction Phases of the project. The following is a detailed summary of the proposed Scope of Work for the three (3) phases (Design, Bid, and Construction) of the project. The Pearland Mobility and Drainage Bond Program (PMDBP) through TC&B will be involved in each milestone of the project as outlined in the Scope of Work. PMDBP comments will be incorporated before continuing on subsequent phases. BASIC SERVICES SCOPE OF WORK DESIGN PHASE Preliminary Plan Layout (Redline Design) - 30% Submittal and Approval (Submit 6 Sets of Bluelines) A. Prepare preliminary detention pond and channel design drawings. (Layout, project control, preliminary plan and profile and cross-sections.) CSDocuments and Settings~kcllerj\Local Settings\Temporary lnternet Filcs\OLK2Xscope-mary.doc ' Pearlahd Mobility and Drainage Bond Program Page 2 November 1 I, 2002 Revised March 25, 2003 Revised August 22, 2003 Revised August 27, 2003 Bo C. D. E. Prepare preliminary pump station layout and design drawings. Provide proposed grade lines on appropriate cross-section drawings. Prepare a draft unit item schedule with quantities. Send copy of plans to TC&B, utility and/or pipeline companies, governmental agencies or municipalities for review and comment. other II. Plan Review - 60% Submittal and Approval (Submit 6 Sets of Bluelines, Unit Price Schedule, Contract Specific Specifications and Draft Quantities) Submit final design drawings. Prepare final list of unit items with quantities. Prepare complete pump station drawing set including electrical and structural details. Prepare any contract specific specifications, and updates to PMDBP standards for items not covered in City of Pearland technical specifications. Prepare a preliminary cost estimate. Prepare a draft SWPPP design. III. Final Plan Review - 90% Submittal and Approval (Submit 6 Sets of Bluelines, Contract Specific Specifications and Unit Price Schedule with Final Quantities) mo B. C. D. Prepare final construction cost estimate. Obtain approval signatures from utility and/or pipeline companies, other governmental agencies or municipalities. Prepare bid form, Summary of Work (1110) and technical specifications not in City of Pearland standards. Prepare final sWPpp. IV. Final Plan Approval - 100% Submittal and Approval mo Submit Final Plans on mylar signed and sealed by a Professional Engineer. Submit Project Description, Special Conditions, and Technical Specification List, to the PMDBP for assembly of the Project Manual. BASIC SERVICES SCOPE OF WORK NON-SHEET RELATED TASK~ BID AND CONSTRUCTION PHASES Non-Sheet Related Task 25-Year Detention Pond Analysis Perform a 25-year analysis of the proposed detention ponds using the current models. This includes a 25-year run of both existing and proposed conditions. Revise inlet and Pearland Mobility and Drainage Bond Program Page 3 Revised March 25, 2003 Revised August 22, 2003 Revised August 27, 2003 outlet structures as necessary to mitigate any impacts to downstream flows or water surface elevations. High School / Fite Road Projects Investigate storage available at High School detention pond north of the Mary's Creek Detention Pond site. Drainage from this site will be directed south and the connection north will be abandoned. Based on the meeting on 8-14-03 the flow from this area is to be directed just upstream and along the west side of the proposed detention pond facility. An outfall restrictor will need to be sized to take advantage of school outfall channel storage. This water will not drain directly into the pond to lessen pumping needs. Included with the school drainage is Fite Road improvements, and how they interact. Separate computations will be prepared for the school/Fite Road drainage. 3. Data Collection and Coordination a. Site Visit - This task consists of going out to the field and walking the proposed pond site. Pictures will be taken along the channel and other areas of interest. If needed, residents will be interviewed. Any unusual features will be noted. b. General Coordination - This task will include visiting appropriate agencies such as City of Pearland and Brazoria Drainage District #4 to obtain pertinent data to the project. PMDBP will provide any available data on previous projects or studies near the study area, ROW information, available modeling data, maps, etc. that may have relevance to the project. c. Coordination with Public/Private Utility Companies - All contacts with public and private utilities will be through the PMDBP. PMDBP will obtain and verify all necessary public and private utility information provided by City of Pearland, Reliant Energy, Entex, Southwestern Bell, etc. d. Geotechnical - All geotechnical information will be obtained through the PMDBP geotechnical consultant. This task includes the collecting and reviewing of all available soils data and assisting with the preparation of an additional scope of work for the geotechnical consultant if required. Also, included is time to review the results of the geotechnical report including pond design recommendations, and slope stability. e. Environmental Services - PMDBP will be responsible for any environmental services required for the project. This task includes time to coordinate with the consultant and/or PMDBP, to answer questions regarding their results. f. Surveying/Topography - All survey information will be obtained through the PMDBP. PMDBP will provide all necessary ground topography, and location of any existing ground features. Included in this information from the PMDBPA shall be a physical tie to Brazoria County flood plain datum's (FEMA), along with any subsidence adjustments necessary for the project area. This task primarily includes the review of all surveying documents, including preliminary parcel taking map(s), final parcel taking map(s), metes and bounds descriptions and monumentation. Deliverables from surveyor will be in form of scroll plot showing all topographic features in plan view, as per PMDBP graphic standards, and computer file in AutoCAD format with the same information. C:\Documents and Settings\kellerj\Local Settings\Temporary Interact Files\OLK2Xscope-mary.doc Pearland Mobility and Drainage Bond Program Page 4 November 11, 2002 Revised March 25, 2003 Revised August 22, 2003 Revised August 27, 2003 o go Status Meetings - There will be monthly status meetings during the design phase of the project. Meetings will be held at TC&B. Hydraulic Calculations - Additional hydraulic calculations to model and design an energy dissipater structure at the detention pond weir inlet and outlet structure. Also included are additional computations to finalize the pump station design as required. Bid Phase Services Attend the pre-bid meeting with PMDBP and potential bidders. Construction Phase Services a. Participate in scheduled walk through inspection. b. Review and approve contractor submittals when requested. c. Respond to Request for Information (RFI's). COMPENSATION We propose to provide the above Basic Services for a lump sum fee of $288,324. The attached spreadsheet provides the estimated personnel categories and hours required to provide the Basic Services. PROJECT SCHEDULE Dannenbaum Engineering Corporation is prepared to begin work immediately after execution of the contract and notice to proceed. The duration of the project is 150 calendar days. See the attached schedule. Note that schedule does not include time waiting for soils or survey information and review time by PMDBP, or other unforeseen delays. Attached is a "Summary of Work" which provides the estimated hours required for each milestone category that includes the Basic Services. Cost associated with property or easement descriptions, boundary surveys or plats are not included in any of the above costs. Should those services be necessary, the associated engineering services will bc considered additional services and invoiced on an hourly basis. Pearland Mobility and Drainage Bond Program Page 5 November 11, 2002 Revised March 25, 2003 Revised August 22, 2003 Revised August 27, 2003 We appreciate the opportunity to present this proposal and to continue working with PMDBP on this important project. If you have any questions or require additional information, please do not hesitate to call me at (713) 527-6365. Sincerely, DANNENBAUM ENGINEERING CORPORATION Alejandro C. Flores, P.E., CFM Senior Project Manager C:\Documents and Settingskkellerj\Local Settingskq'emporary Interact Files\OLK2Xscope-mary.doc LIST OF PROPOSED DRAWINGS See Attached Spreadsheet Estimate DETAIL OF MANHOURS AND COSTS BY CLASSIFICATION PF-ARLAND DETENTION AT MAR~S CREEK AND FM 1128 - DESIGN, BID AND CONSTRUCTION PHASE SERVlCES ESTIMATED TOTAL MANHOURS PER TASK BY CLARIFICATION 1 TOTAL TOTAL PLAN/ M~S COST SHEET PROJ. QUALITY SENIOR DESIGN TECH. ' PER PER DESCRIPTION OF WORK TASK REQUIREMENTS PRINC MGR CONTROL ENGR ENGR CADD SECTY SHEET TASK QNTY SCALE 250.0 156.0 150.0 1080 850 75.0 60.0 FINAL DESIG._.~N TITLE SHEET - W1TH SHEET INDEX __ ~/A 0.0 1.0 1.C'4.C 4._0 .-__ 10.0 0.0 20,C GENERAL NOTES AND SPECIFICATION DATA .-- N/A 0.0 1.0 1 .C 4.0 8.0 24 0 0.0 38.C $3,218 [STIMAT£ SUMMARY N/A 0.0 1 .C 1.C 4.0 8.0 24.0 2.0 40.C $3,338.00 SUMMARY OF QUANTITIES NJA 0.0 I .C 1.0 4.0 8.0 240 2.0 40.{~ --_ $3,338.00 DEMCLF~ON PLANS ~NOT REQUIRED) N/A TRAFF~ CONTROL PLAN (IF NECESSARY) N/A OVERALL DRAINAGE AREA MAP 11"=1000' 0.0 1.C 1.0 8.0 10.0 20.0 0.0 40.0 $3,~?0.00 DRAINAGE SYSTEM LAYOUT MAP 11'=200' 0.0 1.C 1.0 8.0 8.0 24.0 0.0 42.0 $3,650.00 STORM SEWER COMPUTATIONS (NOT REQUIRED) ¥~EST POND LAYOUT SHEET (1'-1 (~Y) 11 "=100' 0.0 1.{~ 1.0 16.0 20.0 ~24,0 0.0 62.0 $5,534.00 EASTPONDLAYOUTSHEET(I"=IOQ') I1'=100' 0.0 1.(~ 1.0 16.0 20.0 24.0 O.C 62.0 $5,534.00 TYPICAL SECTIONS (I OF 2) 11 '=2G' 0.0 1.0 1.0 8.0 8,0 24.0 0.( 42.0 $3,650.00 I~fPICAL SECTION S (2 OF 2) __ 11 "=20' 0.0 1.0 1.0 8.0 8.0 24.0 0.C 42.0 $3,650.00 INLET STRUCTURE LAYOUT WEST POND (1"20~ I I "=20' 0.0 1.0 1.0 16.0 20.0 24.0 0.C 62.0 $5.534.00 WEST/EASTCRO$~-CULVERT{P&P l'-2~} I1"=20' O.Oi 1.0 1.0 16.0 20.0 24.0 0.C 62.0 $6,534.00 CMANNELPLANANDPROFILENORTHDiTCH{I'.40') 11 '=4(Y O.C 1.0 1.0 16.0 20.0 24.0 0.C 62.0 $5,5~4.00 OUTFALL STORM SEWER FOR F{TE ROAD/HiGH SCHOOL DETENTION 4 1"=20' 0.C 1.0 1.0 12.0 20.0 24.0 0.C 58.0 ~20,408.00~ DITCH CROSS-SECTIONS 11"=2{Y 0.C 1.0 1.0 12.0 24.0 24.0 0.(~ 62.0 DRAINAGE STRUCTURAL DETAiL SHEETS (OUTLINED AS FOLLOWS) -OUTFALLWEIR PLAN LAYOUT IVARIES 0,C 2.0 1.0 24.0 10.C 24.C 0.0 61.0 $3,704.0~0 · OUTFALL STRUCTURE DETAILS (1 OF 2) IVARIES 0,(~ 2.0 1.0 24.0 8.C 32.C 0.0 67.0 $6,134.00 - OUTFALL STRUCTURE DETAILS (2 OF 2) 1VARIES 0.{] 2.0 1.0 24.0 8.C 32~C 0.O 67.0 $6,1 ~4.00 .PONOPERIMETER-I'YPICALSECTIONANODETA~LS{BULKHEAD) 1 VARIES ; 0.0 2.0 1.0 24.0 10.C 24.C 0.0 61.0 $$,704.00 - CONCRETE CHANNEL LINING DETAILS I VAR(ES J 0.0 1.0 1.0 24.0 8.(~ 24.0 0.0 58.0 $$.378 00 · OUTFALL AND INTERCEPTOR STRUCTURE DETAILS VARIES 0.0 1,0 1,0 24 0 8.(~ 24.0 0.0 ~.0 STORMWATER POLLUTION PREVENTION PLANS (1'-20~) 1"=200' 0.0 1.0 1.0 10.C 16.~ 24.0 4.0 56.C $4,786.00_ STORMWATER POLLUTION PREVENTION PLAN DETAILS N/A 0.0 1.0 1.0 4,C 16.0 16.0 0.0 38.C $3,298.00 SUBTOTAL DETEN'I1ON RELATED TA~- 2e 0 2~7 23 31e 290 54~2 8 1,200 $122r228.00 D E TAIL E_D~S. ~T_E~P. _LA _N.~% 1~O~ 1"=I0' 0.0 1.0 1.0 16.0 1§.0 ?0.~0 0.0 54.~ WET WELLS AN O PIPING LAYOUT {1 '-$~ 1 '=5' 0.~0 1.0 1 .(~ 24.0 14.0 ~0.~0 0.0 89.~ $7.088.00 :'LECTRiCAL DETAILS -- --I 0.0 1.C 1.0 16.0 4.0 1~.~0 0.C 38.-~ --$3,574 _Q~Q~INCLUDED IN SHEETS1 TOT,Al- SHEET RELATED TASKS __ 44SHTS 0! 45 4t 602 642 1,{~6~ ' 12 2,310 $220r382.00 NON SHEET RELATED TASKS -- SITE V1SIT AND GENERAL COORDINATION 200 16.00 4.00 24.00 24.00 0.00 4 00 COORDINATION MEETINGS (MONTHLY ~ 6 EACH) 0.00 24.00 0.00 24.00 0.00 000 8.~00 5600 ____$6816.00 SPECIFICATIONS (SPECIAL) 1.00 8.00 4.00 8.00 24.00 0.00 4.00 49 00 $5.242.00 SUBTOTAL SUBMITTALS & REVIEW RESPONSE __ 8 ___ 8 IE 32__ 3~2_ ____ _~ _ _.?~6 1~6_0 ~ $16,384.00 TOTAL NON SHEET RELATED TASKS 11 58 26 104 120 48 3E 403 $51,742.00 BID CONSTRUCTION PHASE SERVICES TOTAL $284~124.00 WEST MARY'S CREEK DETENTION POND SCHEDULE Task Name I Duration Start Finish I J . S_gP i Oct Noy.[ D_.e_c__ J_~qnj_F_e._b.~_Ma FINAL DESIGN 150 days Mon 9/15103 :: Thu 4~8~04 Preliminary Plan Layout (Red Line Desig'~')":30~;'~ub~i{tal and 10 wks ' Mon 9ii'5/03~ 'Fd 11/2i/03 Approval City Review Milestone 0 days Plan Layout- 60% Submittal and Approval 10 wKs City Review Milestone 0 days Final Plan Review - 90% Submittal and Approval 5 wks City Review Milestone ..... 0 days Final Plan Approval - i00% submittal and App~:0vai 5 wks Bid Phase / Construction Phase Services (TBD) 0 days Fri 11/2i/03 ! Fd i i/21/~)3 Mon 11/24/03 Thu 1/29/04 Thu 1/29/0~! 'Thu i/29/04 Fri 1/30/04 Thu 3/4/04 Thu 3/4/04~ Thu 3/4/04 Fri 3/5/04 Thu 4/8/04 Thu 4/8/04 ! Thu 4/8/04 Project: Schedule Date: Wed 8/27/03 Task l?i!iii':~iii!iiiii!iiiiiii!i::!!iiiii] Project Summary Split ................... External Tasks Progress External Milestone Milestone ~, Deadline Summary C:\Documents and Settings\kellerj\Local Settings\Temporary Internet Files\(]~,~]chedule.mpp Turn'er Collie Braden Inc. 8/27/2003 EXHIBIT A FEE SCHEDULE Pearland Mobility & Drainage Bond Program Work Authorization No. 3 SUPPLEMENT No. 7 Summary Project West Mary's Creek Detention Facility Engineering Services Hydrologic & Hydraulic Environmental Compliance Topographic Survey Geotech Hydrocarbon & salt testing TRRC testing ROW Maps & Documents PS&E Basic Design Services Bid/Construction Phase SWPP 25-Year Detention Pond Analysis Direct Costs ROW Acquisition Assistance Construction Materials Testing Subtotal Total to Date Dannenbaun Engineering Quadrant JNS Consulting Engineers QC Laboratories QC Laboratories JNS Consulting Engineers Dannenbaun Engineering Dannenbaun Engineering Dannenbaun Engineering Dannenbaun Engineering Dannenbaun Engineering Crosslands Previous Authorization $27,120.00 $28,750.00 $11,980.00 $5,455.00 $ 4,053.00 $ 12,000.00 $17,860.00 $0.00 $0.00 $0.00 $0.00 $0.00 $23,3OO.00 $0.00 $130,518.00 Current Authorization $ - $ - $ - $ - $ - $ $ 258,884.00 $ 12,000.00 $ 8,084.00 $ 5,156.00 $ 4,200.00 $ $ $288,324.00 $418,842.00 Page 1 of 1