Loading...
R2010-038 - 2010-03-24 FAILED Failed March 22, 2010 RESOLUTION NO. R2010 -38 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE OLD TOWNSITE WESTERN GATEWAY. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with the Old Townsite Western Gateway, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to Boyer, Inc., in the amount of $77,683.00. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the Old Townsite Western Gateway. PASSED, APPROVED and ADOPTED this the 22 day of March, A.D., 2010. TOM REID MAYOR ATTEST: YOUNG LORFING, TRMC CITY SECRETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY EXHIBIT A Old Townsite Western Gateway , \s..� ;ate �'... a,_ co. = './ 401111roilitie , :.,..„ 7i..":‘1410,....410,k is' , 1 � .tn ' _ '„, sue"" ~rt .. yF S.. lat fie, � .4, stili ,�,,--- ,,mot - ,� - a s $ $ V./WALNUT r 1,•.- apt. ..-ikt ., \ ... , 1*q. P i �P t ': rrt A. ! .:,,,: c. Cli 0 e. I 1 ; 1_11 ,,,,....., ,,,,,, : 0541,L r .a : , �� , di .�►' .._ '` EXHIBIT C - Boyer, Inc: -.. s i; ,' [ ''ESTIMATED` 1 -, I __._ __ . ._. _ .ITEM - f_. , Li LUNIT QTY,i-. :v::.:� L... UNIT PRICE SITE PREPERATION " " ��,�AMOUNT BID Mobilization LS 1 $1,071.00 $1,071.00 Installation and Maintenance of Traffic Control Devices LS 1 $3,125.00 $3,125.00 Project Sign EA 1 $1,446.00 $1,446.00 Site Demolition LS 1 $2,084.00 $2,084.00 Site Grading and Earthwork LS 1 $2,138.00 $2,138.00 MOMUMENT SIGN Structural Footing LS 1 $1,884.00 $1,884.00 Concrete Masonry Units LS 1 $5,493.00 $5,493.00 Arriscraft Stone Veneer LS 1 $8,115.00 $8,115.00 Cast Stone Accents LS 1 $3,821.00 $3,821.00 Architectural Accent-Pearland Medallion EA 2 $1,146.00 $2,292.00 Cast Stone Sign -Complete in place LS 1 $2,404.00 $2,404.00 Custom Ornamental Iron Work LS 1 $1,108.00 $1,108.00 LANDSCAPE PLANTING 65 Gallon Tree EA 3 $737.00 $2,211.00 5 Gallon Shrub EA 4 $33.70 $134.80 3 Gallon Shrub EA 238 $11.00 $2,618.00 1 Gallon Ground Cover EA 363 $5.60 $2,032.80 'Raleigh' St. Augustine Solid Sod SY 825 $3.45 $2,846.25 Planting Bed Preperation and Soil Mix CY 80 $58.40 $4,672.00 Landscape Mulch - Beds and Tree Wells CY 18 $68.70 $1,236.60 12" Concrete Mow Band LF 130 $15.50 $2,015.00 First Year Maintenance of Planting and Irrigation from Date of Substantial Completion LS 1 $8,732.00 $8,732.00 Performance, Payment and One(1)Year Maintenance Bond LS 1 $2,500.00 $2,500.00 IRRIGATION Irrigation System -Complete in place SF 7,495 $1.65 $12,366.75 ELECTRICAL Sign Light EA 3 $1,380.00 $4,140.00 Column Spot Light EA 2 $1,500.00 $3,000.00 Lighting Circuitry, Controls and Pedestal LS 1 $7,500.00 $7,500.00 TOTAL LUMP SUM BID: Total Bid Price ` �..$90,98620 I I ' 'Millis Development&Constructionf' .n n n a ^7°^^`r� ,r h11 75F� , ..',;! ''4"*7;,.cf Y'+C°_,,., r =+s!^,� Vim. o-r ,Y , �„ r :°. ,K , ; i 1ESTINIATEC?' I , r# r ;2,, ' - � +t r '��'� ,� I� f .s .r� ^�� 7 ,:'� .ii.':> A y,.. r { i!• i s :r, rr .. ,ITEM , L ,2 u F si LUNIT] L.w. ..,.. OT ., 1J; vs`_l UNIT PRIGS_<....., ;.�.' AMOUNT BIDS , SITE PREPERATION Mobilization LS 1 $1,647.06 $1,647.06 Installation and Maintenance of Traffic Control Devices LS 1 $2,470.59 $2,470.59 Project Sign EA 1 $892.16 $892.16 Site Demolition LS 1 $1,990.20 $1,990.20 Site Grading and Earthwork LS 1 $1,372.55 $1,372.55 MOMUMENT SIGN Structural Footing LS 1 $4,617.26 $4,617.26 Concrete Masonry Units LS 1 $1,446.32 $1,446.32 Arriscraft Stone Veneer LS 1 $11,888.61 $11,888.61 Cast Stone Accents LS 1 $3,294.12 $3,294.12 Architectural Accent- Pearland Medallion EA 2 $1,166.67 $2,333.34 Cast Stone Sign -Complete in place LS 1 $1,887.26 $1,887.26 Custom Ornamental Iron Work LS 1 $2,058.82 $2,058.82 LANDSCAPE PLANTING 65 Gallon Tree EA 3 $942.48 $2,827.44 5 Gallon Shrub . EA 4 $29.99 $119.96 3 Gallon Shrub EA 238 $17.07 $4,062.66 1 Gallon Ground Cover .. EA 363 $10.64 $3,862.32 'Raleigh' St. Augustine Solid Sod SY 825 $4.46 $3,679.50 - Planting Bed Preperation and Soil Mix CY 80 . $144.12 $11,529.60 Landscape Mulch- Beds and Tree Wells CY 18 $31.57 $568.26 12" Concrete Mow Band .. LF 130 $18.53 _ $2,408.90 First Year Maintenance of Planting and Irrigation from Date of Substantial Completion LS 1 $5,352.94 $5,352.94 Performance, Payment and One (1)Year Maintenance Bond LS 1 $2,745.10 $2,745.10 IRRIGATION Irrigation System-Complete in place SF 7,495 $1.28 $9,593.60 ELECTRICAL Sign Light EA 3 $1,029.41 $3,088.23 Column Spot Light EA 2 $1,098.04 $2,196.08 Lighting Circuitry, Controls and Pedestal LS 1 $6,931.38 $6,931.38 TOTAL LUMP SUM BID: Total Bid Price k , , ",, ,E t', 4` } =04,864i6 F7f`.`.4Haggatt LP '"_z ,. t � �r 1� ,rE STIMA ED�r M— m 7 € ' rvT x �T g - ;7 ;I ac f;F r a r �€ T UNITPRICE 3 �r - AMONBIDITEM ;x _ SITE PREPERATION Mobilization LS 1 $3,250.00 $3,250.00 Installation and Maintenance of Traffic Control Devices LS 1 $6,500.00 $6,500.00 Project Sign EA 1 $1,600.00 $1,600.00 Site Demolition LS 1 $2,265.00 $2,265.00 Site Grading and Earthwork LS 1 $5,570.00 $5,570.00 MOMUMENT SIGN - Structural Footing LS 1 $5,200.00 $5,200.00 Concrete Masonry Units LS 1 $2,050.00 $2,050.00 Arriscraft Stone Veneer LS 1 $10,700.00 $10,700.00 Cast Stone Accents LS 1 $3,015.00 $3,015.00 Architectural Accent- Pearland Medallion EA 2 $925.00 $1,850.00 Cast Stone Sign -Complete in place LS 1 $2,630.00 $2,630.00 Custom Ornamental Iron Work LS 1 $1,830.00 $1,830.00 LANDSCAPE PLANTING 65 Gallon Tree EA 3 $585.00 $1,755.00 5 Gallon Shrub EA 4 $22.50 $90.00 3 Gallon Shrub EA 238 $25.00 $5,950.00 1 Gallon Ground Cover EA 363 $8.50 $3,085.50 'Raleigh' St. Augustine Solid Sod SY 825 $3.50 $2,887.50 Planting Bed Preperation and Soil Mix CY 80 $75.00 $6,000.00 Landscape Mulch-Beds and Tree Wells CY .. 18 $46.00 $828.00 12" Concrete Mow Band LF 130 $25:00 $3,250.00 First Year Maintenance of Planting and Irrigation from Date of Substantial Completion LS 1 $4,100.00 $4,100.00 Performance, Payment and One (1)Year Maintenance Bond LS 1 $3,627.00 $3,627.00 IRRIGATION Irrigation System-Complete in place SF 7,495 $0.90 $6,745.50 ELECTRICAL Sign Light EA 3 $900.00 $2,700.00 Column Spot Light EA 2 $818.00 $1,636.00 Lighting Circuitry, Controls and Pedestal LS 1 5950 $5,950.00 TOTAL LUMP SUM BID: Total Bid Price „.._ `,�4 ',b, , ,; �` �,Y $95;Q64 50 6 U , --vi ,,' Jerdora Enterprse, LP }` _ ,' ,, ,`m : , ,7 1 F- 7 7>; ``' STIAAATED`` 1 R-- , T.,':'::';',..:,;-':1 1 G LL,� y M.4 . _"_ -_sv_v �_ ___"__ ITEM � �,_ � ._.,._.d.__�.._ti . 6�-UNIT`,, _ QTY ' .. � E UNIT.PRICE ,_., % � MOUNT BID _. _> ? SITE PREPERATION Mobilization LS 1 $2,400.00 $2,400.00 Installation and Maintenance of Traffic Control Devices LS 1 $2,700.00 $2,700.00 Project Sign EA 1 $600.00 $600.00 Site Demolition LS 1 $600.00 $600.00 Site Grading and Earthwork LS 1 $12,662.22 $12,662.22 VIOMUMENT SIGN Structural Footing LS 1 $7,000.00 $7,000.00 Concrete Masonry Units LS 1 $2,200.00 $2,200.00 Arriscraft Stone Veneer LS 1 $7,400.00 $7,400.00 Cast Stone Accents LS 1 $2,400.00 $2,400.00 Architectural Accent- Pearland Medallion EA 2 $2,100.00 $4,200.00 Cast Stone Sign -Complete in place LS 1 $3,000.00 $3,000.00 Custom Ornamental Iron Work LS 1 $1,900.00 $1,900.00 _ANDSCAPE PLANTING 65 Gallon Tree EA 3 $450.00 $1,350.00 5 Gallon Shrub EA 4 $24.00 $96.00 3 Gallon Shrub EA 238 $17.00 $4,046.00. 1 Gallon Ground Cover EA 363 $8.60 $3,121.80 'Raleigh' St. Augustine Solid Sod SY 825 $4.20 $3,465.00 Planting Bed Preperation and Soil Mix CY 80 $15.00 $1,200.00 Landscape Mulch-Beds and Tree Wells CY 18 $15.00 $270.00 12" Concrete Mow Band LF 130 $25.00 $3,250.00 First Year Maintenance of Planting and Irrigation from Date of Substantial Completion LS 1 $3,600.00 $3,600.00 Performance, Payment and One (1)Year Maintenance Bond LS 1 $2,300.00 $2,300.00. IRRIGATION Irrigation System-Complete in place SF 7,495 $1.65 $12,366.75 ELECTRICAL Sign Light EA 3 $950.00 $2,850.00 Column Spot Light EA 2 $1,900.00 $3,800.00 Lighting Circuitry, Controls and Pedestal LS 1 $9,000.00 $9,000.00 TOTAL LUMP SUM BID: Total Bid Price 1:: ., ";h x $97 777 7;7.::