Loading...
R2003-0137 09-29-03RESOLUTION NO. R2003-137 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO ENTER INTO AN ENGINEERING CONTRACT WITH S & B INFRASTRUCTURE, LTD., FOR PRELIMINARY ENGINEERING SERVICES ASSOCIATED WITH THE STATE HWY 35 SOUTH SEWER PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and S & B Infrastructure, Ltd., a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract with S & B Infrastructure, Ltd., for preliminary engineering services associated with the State Hwy 35 south Sewer Project. PASSED, APPROVED and ADOPTED this the 29th day of A.D., 2003. TOM REID MAYOR ATTEST: APPROVED AS TO FORM: c�a..._ H. QR— DARRIN M. COKER CITY ATTORNEY September Exhibit "A" Resolution No. R2003-137 CITY OF PEARLAND STANDARD AGREEMENT FOR ENGINEERING SERVICES This Contract (Contract) is made between the City of Pearland, Texas (hereinafter "City"), and S&B Infrastructure, LTD. (hereinafter "Engineer") as follows: 1. Summary of Contract Terms. The following information and referenced documents shall be a part of this Contract: Description of Project: Provide professional Engineering services for State Hwy 35 South Trunk Sanitary Sewer. Engineer/Subconsultant(s) Fee Basis of Compensation S&B Infrastructure, LTD. $74,529.00 Cost Plus/NTE Maximum Contract Amount $74,529.00 Cost Plus/NTE * All financial obligations created by this agreement are between the City an Engineer, and shall not be construed to be between City and any subconsultant. Delivery of plans, specifications and estimates: Sixty (60) days from completion of work. Attachments: Scope of Services — Exhibit A 2. Services and Payment. Engineer shall perform services within the Standard of Care of the Engineering profession as follows: A. Engineer will furnish services to the City in accordance with the terms and conditions specified in this Contract. Payment for the services of Engineer shall be due and payable upon submission and approval of a statement for services to City. Statements for services shall not be submitted more frequently than monthly. After consultation with the City, the Engineer shall specify the basis of compensation in the scope of work for the project. The Engineer shall provide adequate detail of the basis of compensation so that the City can determine the reasonableness of the fees and have the ability to make reasonable progress payments to the Engineer based upon work completed at the payment intervals. The Engineer shall subcontract for all subconsultants, subject to City approval, necessary to complete the scope of work. The subconsultant's fees and administrative mark-up, if any, shall be included in the scope of work. Unless otherwise agreed upon, the method of compensation shall be one of the following methods: i 1. Salary Cost Times Multiplier Plus Direct Nonsalary Expense ("Salary") Compensation shall be based on 1) the direct salaries (including benefits) of the Engineer's employees whose time is directly chargeable to the project; 2) an agreed upon multiplier to compensate the Engineer for overhead and profit; and 3) reimbursement for direct nonsalary expenditures and subconsultant contracts as defined in the scope of work for the project. The Engineer shall provide a proposal that includes the total fees for the project, which shall not be exceeded without prior City approval. 2. Per Diem ("Per Diem") Compensation shall be based upon 1) an agreed upon lump sum per day for specific services; and 2) reimbursement for direct nonsalary expenditures and subconsultant contracts as defined in the scope of work for the project. This method is best suited to expert witness work or other short-term engagements involving intermittent services. 3. Cost Plus Fixed Fee ("Cost Plus") Compensation shall be based upon 1) reimbursement of the actual costs of all services and supplies related to the project and 2) an agreed upon fixed fee (profit). The Engineer shall provide an estimate of the costs to be reimbursed, but actual compensation shall be based upon invoices and supporting documentation provided by the Engineer. 4. Lump Sum ("Lump") Compensation shall be based upon an agreed lump sum payment for completing the entire scope of work. This method is best suited to investigations or studies and for basic services with limited scope and complexity. 5. Percent of Construction ("Percent") Compensation shall be based upon 1) the "Harris County Curve for Engineering Compensation" for basic and construction phase services; and 2) reimbursement for direct nonsalary expenditures and subconsultant contracts as defined in the scope of work for the project. The Engineer shall provide a proposal that includes the estimated construction cost of the project and the total fees for the project. If the actual low bid for construction is 20% above or below the estimate, the engineering fees are subject to equitable adjustment by mutual agreement of the Engineer and City. If City fails to make any payment due Engineer for services and expenses within thirty (30) days after receipt and approval of Engineer's statement for services therefore, the amounts due Engineer will be increased at the rate of one percent (1%) per month from said thirtieth (30th) day, and, in addition, Engineer may, after giving seven (7) days' written notice to City, suspend services under this Contract until Engineer has been paid in full, all amounts due for services, expenses, and charges. B. All the Engineer's working drawings, plans, and specifications, if required under this Contract, shall be sufficiently accurate, detailed, and complete so that competitive bids for the work can be obtained and the improvements constructed. C. Approval of the Engineer's work by the City shall not release the Engineer, its employees, agents, or consultants, from the responsibility and liability for the accuracy and competency of their designs, working drawings, and specifications, or other documents and services. D. Subject to Article 8 herein or as otherwise agreed, the Engineer shall promptly correct errors in the Engineer's work, including errors discovered after final payment, without receiving additional compensation. E. Prior to execution of this agreement, the Engineer shall have prepared a project schedule identified as an attachment to this agreement. The Project Schedule shall be submitted in digital and paper form, in the Microsoft Project for Windows format. The Project Schedule shall contain a complete schedule so that the Engineer's scope of services under this contract can be accomplished within the specified time and contract cost. The Project Schedule will provide specific work sequence and definite review times by the City and the Engineer of the work performed. If the review time should take longer than shown on the project schedule, through no fault of the Engineer, additional contract time may be authorized by the City through a supplemental agreement, if requested by a timely written request from the Engineer and approved by the City. 3. Term and Termination. This Contract term will begin upon execution and end sixty days after issuance of the certification of completion of construction by the Engineer. The City may terminate this Contract at any time during its term by giving written notice to Engineer. The City shall pay the Engineer for all services rendered to the date of termination. 4. Modifications. City without invalidating the Contract, may order changes within the general scope of the work required by the Contract by altering, adding to and/or deducting from the work to be performed. If any change under this clause causes an increase or decrease in Engineer's cost of, or the time required for, the performance of any part of the Services under the Contract, an equitable adjustment will be made by mutual agreement and the Contract modified in writing accordingly. 3 5. Subcontracts. If, for any reason, at any time during the progress of providing services, City determines that any subcontractor for Engineer is incompetent or undesirable, City will notify Engineer accordingly and Engineer shall take immediate corrective action, which may include cancellation of such subcontract. Subletting by subcontractors shall be subject to the same regulations. Nothing contained in the Contract shall create any contractual relation between any subcontractor and City. 6. Ownership of Documents. All drawings, report data, and other project information developed in the execution of the services provided under this Contract shall be the property of the City upon payment of Engineer's fees for services. Engineer may retain copies for record purposes. Owner agrees such documents are not intended or represented to be suitable for reuse by City or others. Any reuse by City or by those who obtained said documents from City without written verification or adaptation by Engineer will be at City's sole risk and without liability or legal exposure to Engineer, or to Engineer's independent associates or consultants, and City shall indemnify and hold harmless Engineer and Engineer's independent associates and consultants from all claims, damages, losses, and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle Engineer to further reasonable compensation. Engineer may reuse all drawings, report data, and other project information in the execution of the services provided under this Contract in Engineer's other activities. Any reuse by Engineer will be at Engineer's sole risk and without liability or legal exposure to City, and Engineer shall indemnify and hold harmless City from all claims, damages, losses, and expenses including attorneys' fees arising out of or resulting therefrom. 7. Insurance. A. The Engineer shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the Engineer, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. 4 (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non -owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. B. The Engineer shall include the City as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. Certificates of Insurance and endorsements shall be furnished to the City before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. Upon request, certified copies of all insurance policies shall be furnished to the City. 8. Indemnity. Engineer shall indemnify and hold the City, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which Engineer is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the Engineer, his officers, employees, agents, or subcontractors under this Contract. 9. Assignment. Engineer shall not assign this Contract without the prior written consent of the City. 10. Law Governing and Venue. This Contract shall be governed by the law of the State of Texas and no lawsuit shall be prosecuted on this Contract except in a court of competent jurisdiction located in Brazoria County, Texas. 11. Entire Contract. This Contract represents the entire Contract between the City and the Engineer and supersedes all prior negotiations, representations, or contracts, either written or oral. This Contract may be amended only by written instrument signed by both parties. Purchase orders issued under this Agreement shall contain a statement nullifying additional terms and conditions on the reverse side of the purchase order and referencing this Agreement. 12. Conflicts in Contract Documents. The above provisions shall govern over any conflicting provision contained in any referenced contract document specified above. 13. Dispute Resolution Procedures. The Engineer and City desire an expeditious means to resolve any disputes that may arise between them regarding this Contract. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this Contract, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before bringing any legal action, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. 5 EXECUTED and EFFECTIVE as of the 29thday of September CITY OF PEARLAND ENGINEE By: Printed Name: Bi 11 Ei sen Title: City Manager STATE OF TEXAS COUNTY OF —OR_ z-o By: Printed ' ame: 40J. 4• t Title: eu af.4 of , 2003 BEFORE ME, the undersigned Notary Public, on this day personally appeared I/ e/ _ t #i. , known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. GIVEN UNDER MY HAND AND SEAL OF OFFICE THIS c 9 DAY OF , A.D., 20 0 3 . ALA N. LEHMAN dry Public, State of Texas rviy Commission Expires: APRIL 2, 2005 STATE OF TEXAS COUNTY OF //s, 1 S NOTARY PUBLIC IN AND FOR THE STATE OF TEXAS // Printed Name: t/4- .�, My Commission Expires: Arr1 0 a, 200S' /� BEF RE ME, the undersigned Notary Public, on this day personally appeared rIL}P.,Qth R.C.bb iS i1 , known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. GIVEN UNDER MY HAND AND SEAL OF OFFICE THIS 7 DAY OF Cab , A.D., 20 t 3 . G SEI.A A GONZALEZ Notary Public: State of Texas My Cornmissroo Expires 04-25-05 6 NOTARY PUBLIC IN AND R T STATE OF TEXAS Printed Name: 67Sek 4 -6;51•Mie >- My Commission Expires: 9-25 --b,c Mr. Joe Wertz, Jr. Projects Director City of Pearland 3519 Liberty Drive, 3`d Floor Pearland, Texas 77581 Re.: State Highway 35 South Trunk Sanitary Sewer; Preliminary Engineering Report Proposal for Professional Engineering Services Dear Mr. Wertz: September 16, 2003 S&B Letter No.: PU-0285.001rr S&B Project No.: PU-0285 S&B Infrastructure, Ltd. (S&B) is pleased to present this proposal for providing Professional Engineering Services for the referenced project. S&B proposes to provide "Basic" engineering services as described in the attached scope of services for the Lump Sum amount of $73,944. S&B further proposes to provide optional "Additional" engineering and associated services as described in the attached scope of services for the Cost Plus Not to Exceed (NTE) amount of $585 ($74,529 total). Included with this proposal are the previously mentioned narrative scope of services and the detailed opinion of engineering cost. Also included are a preliminary schedule and an order of magnitude construction cost estimate. We appreciate the opportunity to present this proposal to the City of Pearland and look forward to finalizing the agreement and beginning work. If you have any questions or need more information, please call me at 713-845-4802. Sincerely, Eddie Kirst, P.E. Deputy Director Municipal Engineering encl. cc: Mr. H.J. Reddish, P.E. — S&B LEK/dcd S:\project\pu0285-P1nd-SH35_Trnk SS\admin\ltrs\001rr-cop-sh35-s-per-prop.doc 3535 Sage Road • Houston, Texas 77056-7011.713.845.5401 • Fax 713.993.9301 ATTACHMENT "A" SCOPE OF SERVICES State Highway 35 South Trunk Sanitary Sewer; Preliminary Engineering Report Pearland, Brazoria County, Texas GENERAL: The work to be furnished by S&B Infrastructure, Ltd. (Engineer) under this contract shall consist of Engineering services required for preparing a preliminary engineering report for design of State Highway 35 South Trunk Sanitary Sewer. The main trunk sewer connects to the proposed Magnolia Drive Trunk Sewer and is located along State Highway 35 with limits from Swensen Road to Cowart Creek. This system also includes four lateral sewers. The first lateral is located along John Lizer Road from State Highway 35 to Pearland Parkway. The second lateral is located along the north access road of Pearland High School from State Highway 35 to Pearland Parkway. The third and fourth laterals are located east and west of State Highway 35 along Industrial Road. This sewer project is an integral part of the City of Pearland's (City) master sanitary sewer plan. These services shall be in accordance with the City's design standards and in English units. The Engineer shall furnish all equipment, materials, supplies, and incidentals as needed to perform the services required. The Engineer will perform all work efforts and prepare all deliverables in accordance with the applicable / current requirements of the City's specifications, standards, and manuals. Whenever possible, the City's standard drawings, standard specifications or previously approved special provisions and / or special specifications will be used. If a special provision and / or special specification must be developed for this project, it shall be prepared in City format and, to the extent possible, incorporate references to approved City test procedures. The Engineer will develop and submit a work schedule with milestone activities and/or deliverables identified Microsoft Project for Windows. BASIC SERVICES: Preliminary Phase: The Engineer shall produce a letter report deliverable recommending location for the proposed State Highway 35 South Trunk Sewer with horizontal and vertical alignments. The Engineer shall meet with the City staff at the beginning of the project to determine the design concepts for the State Highway 35 South Trunk Sewer and the Veterans Lift Station. The Engineer shall incorporate applicable data obtained from the City's hydraulic modeling consultants into the cost-effectiveness analysis package. The Engineer shall provide standards for sanitary sewer planning and provide details for the Page 1 of 3 ATTACHMENT "A" applied engineering approach as a result of planning activities. The Engineer will hold progress meetings with the City staff at 30% and 90% complete stages to gather and incorporate comments, and to present 100% documents. The goal of the Cost -Effectiveness Analysis is to determine the best combination of gravity sewers, force mains, lift stations, and treatment facilities to provide sanitary sewerage service to the Veterans Lift Station Sub -basin Area. The following is a list of anticipated tasks to be provided under basic services: • With Veterans Lift Station at the intersection of Magnolia Road and Veterans Drive, evaluate gravity trunk sewer along Magnolia from Veterans to State Highway 35 and along State Highway from Swensen Road to Cowart Creek, including laterals. The intent of the study is to eliminate existing lift stations along each route. • Define the Veterans Lift Station Service Area sewerage system components and it's sub -basins. Collect / develop flow criteria for the land use within the service area. Collect / prepare population projections based on the "Land Use and Urban Development Ordinance No. 509" and "Wastewater and SCADA System Master Plan" prepared by Montgomery Watson Harza (MWH). Determine the existing and ultimate average daily flows (ADF) for each sub -basin using the City's Zoning Map. Determine the design Inflow / Infiltration flows for each sub -basin. • Prepare presentation maps to compare alternatives identifying major cost components. Identify existing facilities and life -services expectancy based on TWDB projections and modeling consultants current master plan hydraulic model. Compare the advantages and disadvantages for each alternative. • Coordinate with the City's Hydraulic Modeling Consultant to run the agreed upon alternative. • Develop a cost-effectiveness workbook using historical information for alternative components i.e. Gravity Sewers, Force Mains, List Stations and Treatment Plants. Cost shall include facility, land, operation and maintenance. Prepare a letter report comparing the alternatives and make recommendations that define future development of the sewage system within the Magnolia Service Area. ADDITIONAL SERVICES: The Engineer shall provide additional engineering services as described below: Page 2 of 3 ATTACHMENT "A" Reimbursable Expenses: The Engineer shall provide courier services, travel for Engineer's personnel to and from official meetings and the project site, and internal reproductions of plans and specifications. The total amount for all reimbursable expenses shall not exceed $585 without prior authorization from the City. Page 3 of 3 -{11111 ASTRUCTURE, LTD. OPINION OF ENGINEERING COST ae�.a 6 awwun G rueu�ea.- FOR State Highway 35 South Trunk Sanitary Sewer; Preliminary Engineering Report City of Pearland S&B Project No.: pu0285 Revised: Sep. 15, 2003 DESCRIPTION Dir/PM Sr, Eng. PE EIT/Dsgn CADD Cler TOTAL MANHOURS TOTAL COST BASIC SERVICES: Preliminary Phase, Area 100 (LS): Coordination with Montgomery Watson 4 4 4 4 4 20 $ 2,172 Project Scope Development and Coord. Meetings 12 64 64 16 16 8 180 $ 20,004 Service Area Definition and Flow Analysis 9 48 48 12 12 6 135 $ 15,003 Preliminary Eval.; Veteran's Trunk Sewer to City Limits 4 16 16 4 4 2 46 $ 5,136 Preliminary Eval.; Veteran's Pump Station 4 16 16 4 4 2 46 $ 5,136 Progress Meeting - Prlm Findings with Cost (30%) 3 3 3 3 1 13 $ 1,464 Model Run 6 32 32 8 8 4 90 $ 10,002 Review Computer Model Results 3 16 16 4 4 2 45 $ 5,001 Sewerage System Cost Analysis 3 8 8 5 2 1 27 $ 2,991 Progress Meeting - Conclusion and Recom (90%) 3 3 3 3 1 13 $ 1,464 Prepare/Present Preliminary Letter Report 4 10 10 4 2 4 34 $ 3,684 Prepare/Present Final Letter Report 2 5 5 2 4 18 $ 1,887 Subtotal Preliminary Phase, Area 100 (LS): I 57 225 225 69 56 35 667 I $ 73,944 TOTAL BASIC SERVICES: I 57 225 225 69 56 35 667 I $ 73,944 ADDITIONAL SERVICES: Preliminary Phase, Area 110 (CP): Engineering: Subtotal Engineering: t Reimbursable Expenses: Deliveries +/-5 Deliveries @ $15/ea. $ 75 Mileage/Travel +/-8 Trips @ 52 mi/trip @ $0.36/mi $ 150 Meals/Lodging $ 360 Subtotal Reimbursable Expenses: I [ $ 585 Subconsultants/Vendors: Subconsultant Administrative Fee I 10% Subtotal Subconsultants/Vendors: I Subtotal Prlm. Ph. Add. Svcs., Area 110 (CP): I I $ 585 TOTAL ADDITIONAL SERVICES: $ 585 ` TOTAL COST: 57 225 225 69 56 35 667 $ 74,529 Assumptions: 1) Design of all segments to be done concurrently as one drawing package 2) No New ROW, Sidewalks, Street Lights, Easements, or Environmental Assessments S:\project\pu0285-Plnd-SH35_Trnk_SS\Cost_Estimates\Eng\005-exh-d-per-engr-mp-cost-15-sep-03.xls\Task Originated: 01/13/03 Form: 2/12/03 Page 1 of 1 Printed: 9/16/2003 3 3 1 a N mm Submit "Bid Ready" PS&E Package Obtain Final Signatures and Approvals Prepare 100% PS&E Package Prepare 90% PS&E Package 0 d Uodaa JauaW IIwgng m 3 v No a + G NA A N O j E. Op N N N N m• N a a a u a n a n m a a a N N N N m N N N N N N N N m N h y •m .'p. f f(3 C 0 1 C i , '1^ 1 'f ? f W � A N N `N ( N NO A W ` AA A A N O O W W A (3 • p,W W N m ' O] Of N T. m 2 O2 7 T. il mj O> T. T. W V O1 QN A A N y 5 ` N N A AA W W A AN A A V. p• N• pA A • 3 N m 0 0 z F 1 l Vl 1O cm tp � W W W W W W 1 -I w A w I Uodea Jada1 FuugnS £0/9/0L uotN 1 C T T1 O' \Tm Z >o ZD( vvth oo0c - yD C o c cnn z z o,�,^^ VI mmZ >n N Z ry m mm r co CITY OF PEARLAND Construction Cost Estimating Workbook Order of Magnitude PROJECT NUMBER : PU0285 SCENARIO : State Highway 35 South Trunk Sewer SERVICE AREA : Magnolia Subbasin : State Highway 35 South Trunk Sewer PROJECT COST: $ 3,476,650 16-Sep-03 Construction Costs Adjustment Date of Estimate : ENR Construction Cost Index November-02 ENR Construction Cost Index ,Lily-03 Inflation rate Number of Years Average Inflation rate Period in years Difficulty Factor (Urban, Utility Relocation and Dewatering) April-03 6578 6695 1.8% 0.67 3% 25 1.15 Manhole Number FacilityDescription p Diameter inches Length feet Depth feet Number Manholes of Capacity mgd or mg Unit Prices Right -of -Way Manhole Manhole Odor Construction Right of Way Capital 0 & M Present Worth From To Material Bid Tab Restoration Misc. (YIN) and Pavement (YIN) Total (ac) (type) ($lft2) Unit Price Facility Cost Cost Control Cost Cost Cost Cost Cost Value Section No. 1 - Sanitary Sewer along State Highway 35 from Swensen Road to Magnolia Road 19 100' N of 19 Tunnel under John Lizer 12,0 100 20.0 2 $ 13.57 $ 299.66 S 299.66 0.02 $ - $ 3,983 $ 29,966 $ 7,967 $ 37,933 $ - $ 52,347 $ 70 $ 41,316 100' N of 19 134 Gravity Sewer 12.0 2,274 16.5 5 $ 13.57 $ 76.36 y $ 30.05 $ - :$ 106.41 0.52 2 $ 2.50 $ 3,383 $ 241,979 $ 16,917 $ 258,896 $ 56,850 $ 414,126 $ 1,592 $ 392,675 Sub Total $ 296,828 $ 56,850 $ 466,473 $ 1,662 $433,991 Section No. 2 - Sanitary Sewer along State Highway 35 from Magnolia Road to Cowart Creek and Industrial Road West of State Highway :35 19 100' N of 47 Gravity Sewer 30.0 1,881 21.0 4 $ 76.67 $ 136.63 y $ 53.77 $ - a 190.40 0.43 2 $ 2.50 $ 7,151 $ 358,144 $ 28,604 $ 386,748 $ 47,025 $ 580,737 $ 3,292 $ 592,858 100' N of 47 47 Tunnel under High Road School Access 30.0 100 20.0 2 $ 76.67 $ 615.81 :i 615.81 0.02 $ - $ 7,001 $ 61,581 $ 14,002 $ 75,583 $ - $ 104,305 $ 175 $ 84,041 47 100' N of 52 Gravity Sewer 30.0 2,227 18.5 3 $ 76.67 $ 129.92 y $ 51.13 $ - $ 181.05 0.51 2 $ 2.50 $ 6,701 $ 403,191 $ 20,103 $ 423,294 $ 55,675 $ 639,820 $ 3,897 $ 667,317 100' N of 52 52 Tunnel under Oiler Drive 30.0 100 17.0 2 $ 76.67 $ 615.81 S 615.81 0.02 2 $ 2.50 $ 6,551 $ 61,581 $ 13,102 $ 74,683 $ 2,500 $ 105,563 $ 175 $ 85,641 52 56 Gravity Sewer 24.0 2,995 14.0 6 $ 50.29 $ 101.48 y $ 39.94 $ - S 141.42 0.69 2 $ 2.50 $ 6,101 $ 423,540 $ 36,606 $ 460,147 $ 74,875 $ 709,877 $ 5,241 $ 788,323 56 3 Gravity Sewer 27.0 221 11.5 1 $ 62.83 $ 87.00 y $ 34.24 $ - S 121.24 0.05 2 $ 2.50 $ 5,651 $ 26,794 $ 5,651 $ 32,445 $ 5,525 $ 50,299 $ 387 $ 56,661 3 59 Gravity Sewer 24.0 2,085 10.5 4 $ 50.29 $ 73.89 y $ 29.08 $ - S 102.98 0.48 2 $ 2.50 $ 5,501 $ 214,709 $ 22,004 $ 236,714 $ 52,125 $ 378,790 $ 3,649 $ 465,177 59 150' W of 56 Tunnel under State Highway 35 24.0 150 11.0 2 $ 50.29 $ 516.73 ;' 516.73 0.03 $ - $ 5,651 $ 77,510 $ 11,302 $ 88,812 $ - $ 122,561 $ 263 $ 101,498 150' W of 56 26 Industrial Road Sewer West Gravity 12.0 2,635 9.0 5 $ 13.57 $ 46.69 y $ 18.38 $ - S 65.06 0.60 $ - $ 2,333 $ 171,445 $ 11,667 $ 183,113 $ - $ 252,695 $ 1,845 $ 272,255 Sub Total $ 1,961,538 $ 237,725 $ 2,944,648 $ 18,923 $3,113,771 Section No. 3 - Sanitary Sewer along John Lizer Road from State Highway 35 to Pearland Parkway and along Pearland Parkway North 19 129 Gravity Sewer 24.0 2,610 20.0 5 $ 50.29 $ 120.40 y $ 47.39 $ - 5 167.78 0.60 $ - $ 7,001 $ 437,916 $ 35,005 $ 472,921 $ - $ 652,631 $ 4,568 $ 693,661 129 100' N of 129 Tunnel under John Lizer 18.0 100 19.0 2 $ 29.20 $ 412.15 S 412.15 0.02 $ - $ 5,184 $ 41,215 $ 10,369 $ 51,583 $ - $ 71,185 $ 175 $ 60,041 100' N of 129 133 Gravity Sewer 18.0 1,849 16.5 4 $ 29.20 $ 93.24 y $ 36.70 $ - S 129.94 0.42 $ - $ 4,734 $ 240,261 $ 18,937 $ 259,199 $ - $ 357,694 $ 3,236 $ 415,577 Sub Total $ 783,703 $ - $ 1,081,510 $ 7,978 $1,169,279 Section No. 4 - Sanitary Sewer along North Access Road for Pearland High School from State Highway 35 to Pearland Parkway 47 21 Gravity Sewer E v 1 ,,, 17 0 4 $ 29.20 $ 95.83 y $ 37.72 $ 37.34 S 170.89 0.45 4 $ 5.00 $ 4,884 $ 337,161 $ 19,537 $ 356,699 $ 98,650 $ 590,894 $ 3,453 $ 622,215 Sub Total 356,699 $ 98,650 $ 590,894 $ 3,453 $ 622,215 `$ Section No. 5 - Sanitary Sewer along Industrial Road East of State Highway 35 3 29 Industrial Road East Sewer Gravity 8.0 11 8 5 3 $ 6.31 $ 33.46 $ 13.17 $ - S 46.63 0.35 2 $ 2.50 $ 2,333 $ 70,881 $ 7,000 $ 77,881 $ 38,000 $ 145,476 $ 1,064 $ 167,302 Sub Total $ 77,881 $ 136,650 $ 145,476 $ 1,064 $ 167,302 TOTAL: $ 3,476,650 $ 529,875 $ 5,229,001 $ 33,080 $5,506,558 Notes : 1. Capital Cost includes ROW Acquisition, Engineering (8%), Legal and Administration (5%), Construction Management (10%) and Construction Contingencies (15%). 2. ROWs are 10 foot wide and costs categories are 1) Acquire Easement ($1.25), 2) Rural Area ($2.50 3) Developed Area ($3.75) 4) Primary ($5.00). s1project\pu02851estimslconst1003- CoP- SH 35 Trunk- Construction Cost.xls ts i t ice. •,1' Cyr dA' / T'• _ _ • J- ./ ett.; Ire • r• M • • Exhibit Resolution No. R2003-137 11 pages & 8 nl awinys I. 1.7244.'r! �-�a‘-i�� ..e.,s�._ _ '.ti +'�' • - ant • Are J ;C.,,,,;; >_ • _ram_ -r. �l _ ✓, ��1' 1 �����:. 4• swami.. -, fry -,i4. y ° . --1- a. r _, _ ' •- .-c -• �.-. Z_-. •�^ CITY OF PEARLAND Veteran's Lift Station Service Area Analysis and Recommendation Report ... -I a siwi ant • __n !lll�iiv atta taws -=r�mnnati�it�rm�► —�• 1-111111 " la i1urnv111f.y ASTIIUCIME,JT& Engineering 0 Management 0 Technology • Mr. Joe Wertz, Jr. Projects Director City of Pearland 3519 Liberty Drive, 3 d Floor Pearland, Texas 77581 August 5, 2004 S&B Letter No.: U-0285.003 S&B Project No.: U-0285 Resolution No.: R2003-137 Re.: Letter Report for the Veteran's Lift Station Service Area Analysis and Recommendations for Improvements Dear Mr. Wertz: The following is S&B Infrastructure, Ltd 's (S&B) Letter Report for the analysis of the Veteran's Lift Station Service Area and Recommendations for Improvements. EXECUTIVE SUMMARY At the request of the City of Pearland (City), S&B has prepared this Letter Report to present the results of an analysis of the current and future wastewater system requirements for the Veteran's Lift Station Service Area, and make recommendations for the most cost-effective approach to future City improvements in the region. The current Veteran's Lift Station Service Area encompasses approximately 1,280 acres in southern Pearland, Brazoria County, Texas. Within the service area ale business industrial, and residential developments parks, and a significant amount of undeveloped acreage. This entire area is serviced by numerous shallow gravity sewer systems with small lift stations that convey wastewater flows through several small forcemains to other gravity systems that eventually lead to the Barry Rose and Southwest Environmental Center Wastewater Treatment Plants. The existing shallow sanitary sewer systems were designed and constructed with a depth constraint of approximately 20 feet below natural ground. This design guideline was adopted some time ago by the City based on geotechnical testing evidence of a perched water table and observed field conditions during previous construction projects of a sand lens located at this depth. This depth restriction limited the area that could be served by a single gravity sanitary system without the numerous small lift stations previously mentioned. A number of different growth pattern scenarios were evaluated for use in determining current and future capacity requirements of the Veteran's Lift Station Service Area. All growth pattern scenarios were developed using the City of Pearland's Existing and Proposed Land Use Plan found in their 1999-2020 Comprehensive Plan. Daily wastewater flows were calculated for existing and future conditions using these estimated population numbers and usage rate criteria from the Texas Commission on Environmental Quality (TCEQ), formerly the Texas Natural Resource Conservation Commission, Chapter 317 — Design Criteria for Sewerage System (§317.4 Wastewater Treatment Facilities, figure 1: Page 1 of 10 30 TAC §317.4(a)). After preliminary population and wastewater flow information for five (5) different growth pattern scenarios (Exhibits 7.2 - 7.6) was reviewed with the City, S&B was directed to use the City Limits Current Growth Pattern Scenario - Year 2050 (Exhibit 7.3) as the basis for further design, analysis, cost comparisons, and recommendations for improvements. The improvements recommended for the Veteran's Lift Station Service Area include construction of a single ` regional" lift station at the southeast corner of Magnolia Street and Veterans Drive, and an integrated "deep" trunk gravity sanitary sewer system. The main trunk sewers will extend from the recommended lift station south along Veterans Drive to the City Limits, east along Magnolia St. and John Lizer Road to Pearland Parkway, and south along State Highway 35 from Magnolia Road to Cowart Creek. Pipe sizes will range from 24 to 36 inches. Smaller branches of the trunk sewer system will extend north along SH 35 to pick up the Swensen lift station east from SH 35 along the high school north access road to Pearland Parkway to pick up that lift station and east and west from SH 35 along Industrial Drive. A future branch will extend west from Veterans along Bailey to McLean then turn north for a thousand feet or so to pick up two existing lift stations. Another future branch will extend east from Veterans Drive along future Bailey Rd. then south along Wells Drive to McKeever Road, then east along McKeever Road approximately 1,500 feet. Sizes of the branch trunks will range from 12 to 18 inches. This system will service more than 3,000 acres (approximately 1 700 additional acres) and provide for the elimination of up to nine (9) small existing lift stations. It will also allow most if not all of the undeveloped property within the service area to be developed without lift stations in the future To serve this expanded area with the recommended regional lift station location 20 % of the recommended gravity trunk sewer system, along Magnolia Street and Veterans Drive, will exceed the old 20-foot depth limit with the maximum depth of 24 feet at the lift station. However, today's impioved construction techniques and pipe materials allow for construction of deep sanitary systems that provide acceptable service life expectancy even in saturated soil conditions such as those found in the Veteran's Lift Station Service Area. The new lift station will also be SCADA ready and will initially convey flows to the Southwest Environmental Center Wastewater Treatment Plant, and capable of being easily modified to divert flows to other treatment plants in the future if needed. Estimated construction costs were developed to compare the recommended deep trunk sewer/regional lift station approach to future development of the service area versus continuing the current shallow sewer/multiple lift station approach. While the capital cost of a deep trunk sewer system will be more, based on S&B's life cost analysis, the recommended approach is more cost efficient overall for the fifty year design life of the facilities the City will likely build within the entire service area. It is also less maintenance intensive and therefore more cost efficient to service one "regional" lift station than the nine (9) existing and possibly as many as four (4) future "small" lift stations. Funding for implementation of most of the recommended deep trunk sewers and the regional lift station will be provided through the City and the Pearland Economic Development Council (PEDC) Some portions will be funded by or even constructed by future developments. S&B believes that the current sanitary sewer design approach of shallow sewers and small lift stations in the Veteran's Lift Station Service Area must be changed to ensure a more cost effective solution to long- term development of the sewerage system within the service area and reduce the future maintenance Page 2 of 10 burden for the City. A deep trunk sewer/regional lift station design approach does both. The analysis, findings, and recommendations presented in this report merely represent the first step in the process of developing an efficient regional wastewater system The next steps are detailed final design and preparation of engineering plans, followed by construction. S&B appreciates the opportunity to present this report and looks forward to working with the City of Pearland in the successful development of the Veteran's Lift Station Service Area. 1.0 INTRODUCTION On September 29, 2003, S&B was authorized by the City of Pearland to perform an analysis of the Veteran's Lift Station Service Area and make recommendations for improvements to ensure a cost effective, orderly, planned development of the wastewater collection and conveyance system for the entire service area. In preparing this report, S&B used Montgomery Watson Harza's (MWH) wastewater master plan and the City's 1999-2020 Comprehensive Plan as guidelines in developing service area limits and associated populations of the existing sewered areas and five (5) long-range growth/build-out scenarios for currently unsewered property. State criteria for per capita wastewater flows were applied to these population projections to develop the current and future sewer system and lift station capacity requirements as the basis for evaluation and comparison of the five growth scenarios. Specific design considerations for each of these scenarios are discussed in greater detail in Section 4 of this report. 2.0 PURPOSE The purpose of this report is to present the results of an assessment of the current and future sewerage requirements for the Veteran's Lift Station Service Area and to make recommendations for cost-effective future improvements. It is not intended to provide a design, only an exploration of options and possible solutions to be studied further in the final design process. Detailed final designs, accompanied by topographic surveys and geotechnical investigations, must be conducted in order to effectively implement the recommended solution during development of the service area. 3.0 EXISTING CONDITIONS The Veteran's Lift Station Service Area currently covers approximately 1,280 acres of land in south central Pearland Biazoria County, Texas The limits and location of the existing service area are shown on Exhibit 7.1. The service area contains business, industrial, and residential developments, parks, and undeveloped acreage All the currently sewered areas within the entire Veteran's Lift Station Seivice Area are serviced by shallow gravity sewer systems with numerous small lift stations. Wastewater flows from the area are conveyed by force mains to other gravity sewer systems that ultimately lead to the Barry Rose and Southwest Environmental Center Wastewater Treatment Plants. 4.0 DESIGN CONSIDERATIONS Montgomery Watson Harza (MWH) prepared a wastewater master plan for the City of Pearland titled "Wastewater and SCADA System Master Plan" in October 2002. As part of this service, Page 3 of 10 MWH gathered information from City Departments to establish service area limits for the City's wastewater treatment plants. In accordance with the MWH Master Plan, the Veteran's Lift Station Service Area is actually a sub -area of the Southwest Environmental Center Wastewater Treatment Plant service area MWH then developed a hydraulic model for the wastewater systems to identify existing capacity deficiencies and future capacity requirements. The City requested that S&B use information from MWH's wastewater master plan and the City's 1999-2020 Comprehensive Plan in analyzing the Veteran s Lift Station Service Area. The City also requested that a cost comparison be performed for developing the regions wastewater system with a deep gravity sanitary sewer system, a regional lift station, and eliminating as many small existing lift stations as was feasible, versus maintaining the existing system and continuing development of the wastewater system using the current shallow sewer/multiple lift station approach. The design considerations necessary in performing the analysis of the Veteran's Lift Station Service Area can be broken down into four primary categories; 1) establishing the ultimate limits of the service area, 2) estimating population growth, 3) calculating daily wastewater flows, and 4) flow conveyance hydraulics and system depth. The assumptions, criteria, and methodologies covered under these topics below provide the basic design tools to answer questions regarding the quantity of sewage that will need to be conveyed and how to convey it. 4.1 SERVICE AREA LIMITS In determining the limits of the Veteran's Lift Station Service Area for this evaluation, S&B took into consideration: the MWH master plan, the City's 1999-2020 Comprehensive Plan area topography and physical restrictions, such as roads and streams, input from City staff, and a "new' maximum sewer depth of 24 feet below existing grade. From this, the maximum serviceable area was determined to be some 3,000 acres. The limits of this service area are roughly Mary's Creek on the north, the Pearland Parkway corridor on the east, McLean Rd. on the west, and the current City Limits on the south, as shown on Exhibits 7.1-7.4. 4.2 POPULATION GROWTH A number of different growth pattern scenarios were evaluated to determine the future capacity requirements of the Veteran s Lift Station Service Area. All growth pattern scenarios were developed and evaluated using the City of Pearland's existing and proposed Land Use Plan found in their 1999-2020 Comprehensive Plan, existing GIS data (parcels, zoning maps, collection systems, etc...), and 2002 aerial photography. The different growth pattern scenarios are shown graphically on Exhibits 7.2 through 7.6. Population numbers of 3.2 persons per dwelling unit were used for all low-, medium - and high -density residential developments and undeveloped areas. Dwellings for undeveloped residential areas were calculated using the maximum dwelling units per acre allowed per the Comprehensive Plan (4 dwellings per acre for low density residential, 10 dwellings per acre for medium density residential, and 10 dwellings per acre per 3 story Page 4 of 10 height for high density residential). Current populations for industrial light industrial, general business and schools were obtained through site visit and telephone interviews with current tenants In the absence of existing data, criteria used by the City's Fire Marshall of 1 person per 100 square feet, was used. From the data discussed above, the following five (5) population growth/build-out scenarios were developed: Existing Scenario - Year 2000 : This scenario represents the total number of people within the Veteran's Lift Station Service Area already connected to a City sewer. The area encompassed by this scenario is shown as Sewered, Developed" on Exhibit 7.1. Existing Scenario with 100% Sewered System - Year 2005 : This scenario represents the total number of people within the Veteran's Lift Station Service Area projected to be connected to a City sewer by 2005. The area encompassed by this scenario is shown as `Sewered, Developed" on Exhibit 7.2 and is bound on the south by the current city limits. City Limits Curr ent Growth Pattern Scenario - Year 2050 : This scenario represents the total number of people within the Veteran's Lift Station Service Area projected to be connected to a City sewer by 2050 based on current growth patterns. And, it is the basis for the findings and recommendations presented later in this report. The area encompassed by this scenario is shown as "Sewered, Developed" on Exhibit 7.3. City Limits Build -Out Scenario - Year 2050 : This scenario represents the total number of people within the Veteran's Lift Station Service Area projected to be connected to a City sewer by 2050 based on the Comprehensive Plan's `Ultimate Build -Out" growth patterns. This includes re -development of existing rural or ` Hoise-Lot' parcels to low density residential lots. The area encompassed by this scenario is shown as "Sewered, Build -Out" on Exhibit 7.4. City Limits and ETJ Current Growth Pattern Scenario - Year 2070 : This scenario represents the total number of people within the Veteran's Lift Station Service Area projected to be connected to a City sewer by 2050, plus, the total number of people projected to be within the City's ETJ to the south, that could be connected to a City sewer by 2070 based on current growth patterns. The area encompassed by this scenario is shown as "Sewered, Developed" on Exhibit 7.5. The wastewater numbers derived from this population projection were not used to develop the future sewer system recommendations. City Limits and ETJ Build -Out Scenario - Year 2070 : This scenario represents the total number of people within the Veteran's Lift Station Service Area projected to be connected to a City sewer by 2050, plus the total number of people projected to occupy areas within the City's ETJ to the south, that could be connected to a City sewer by 2070 on the Comprehensive Plan's ' Ultimate Build -Out' growth patterns. The area encompassed by this scenario is shown as "Sewered, Build -Out" on Exhibit 7.6. The wastewater numbers derived from this population projection were not used to develop the future sewer system recommendations. Page 5 of to Population numbers for all scenarios are shown in the tables found on Exhibits 7.1-7.6. 4.3 CALCULATING DAILY WASTEWATER FLOWS Daily wastewater flows for the Veteran's Lift Station Service Area were calculated for existing and future conditions using the estimated population numbers and criteria from TCEQ Chapter 317 — Design Criteria for Sewerage System (§317.4 Wastewater Treatment Facilities, figure 1: 30 TAC §317.4(a)). The design daily wastewater flows, in gallons per day per person are: Daily (GPD Wastewater / Flow Zone Person) General Business 20 Industrial 20 Light Industrial 20 Low Density Residential 100 Medium Density Residential 100 Parks 5 Public / Semi -Public 20 The daily wastewater flows generated by the different growth pattern scenarios are shown on Exhibits 7.1 through 7.6. 4.4 FLOW CONVEYANCE HYDRAULICS AND SYSTEM DEPTH At the request of the City, a uniform peak factor of 4 was applied to the daily wastewater flows determined in Section 4.3 to establish the design flows. In accordance with state criteria, a roughness coefficient of 0.013 was used. Flow velocities were held to a minimum of 2.0 feet per second. The system was designed for "no surcharging" during dry- and wet -weather design flows Analysis of flow conveyance hydraulics consisted of using Manning's formula to evaluate closed conduit system capacities of proposed gravity sanitary sewers to determine preliminary pipe size/slope combinations required to convey the design flows. This pipe size and slope data was entered into AicView (by ESRI) along with the preliminary system layout and GIS topographic data from the City's web site (reconciled against field survey data provided by C.L. Davis & Co. (CLD)). Flowlines and top elevations for the existing small lift stations and topographic information for other pertinent features within the Veteran s Lift Station Service Area (also provided by CLD) were also added. Finally, the maximum allowable flowline depth of 24 feet below grade was entered. Page 6oflo The result was a 3-D computer model of a trunk sanitary sewer system for the entire service area. The starting flowlines of various branches were then adjusted to meet capture depth requirements at as many of the existing small lift stations in the service area as were possible. Starting flowlines of branches that would not be capturing an existing lift station were adjusted to ensure the "actual" service area limits at least matched the `evaluation" service area limits discussed in Section 4.1 above. Based on these point flowlines, the pipe size/slope information, and the maximum allowable flowline depth, the model calculated the profiles for every trunk sewer in both the shallow and deep systems. Upon review, only minor adjustments were needed to resolve a few flowlme conflicts and velocity deficiencies and bring both systems into compliance with all design criteria previously discussed. 5.0 ALTERNATIVE ANALYSIS AND FINDINGS 5.1 ALTERNATIVE ANALYSIS • Alternative No. 1 - Continue Development Of The Service Area With Shallow Gravity Sewers And Numerous Small Lift Stations Under this alternative, that could also be called the "Do Nothing" alternative, the City would maintain the existing sewers and numerous lift stations indefinitely and future development of the Veteran's Lift Station Service Area system would continue using the current shallow sewer/multiple lift station design approach. The shallower trunk system in this approach would require three new lift stations; one at State Highway 35 and Magnolia, one on Veterans south of Bailey Road, and one at Pearland Parkway Estates, with firm capacities of 6.56, 5.40 and 0.56 million gallons per day, respectively. Advantage: • Lower capital cost for shallower trunk sewers (See Table 8.2 and 8.3). Disadvantages: • Higher aggregate capital and long-term O&M costs for three new smaller/shallower lift stations versus one larger/deeper regional lift station. • Continued O&M cost for the existing small lift stations/shallow sewers (See Tables 8.2 and 8.3). • Does not benefit from excellent current construction market prices since construction would be done on an as needed basis over several years. • Shallow trunk sewers will force some future land development projects to construct small lift stations further adding to the City's O&M burden. • All flows pumped at least twice. Estimated construction cost for this alternative is: $8,318,775 Page 7 of 10 Estimated present worth value for this alternative is: $21,388,795 • Alternative No. 2 - Construct A Deep Trunk Gravity Sanitary Sewer System With A Regional Lift Station This alternative consists of a regional lift station at the southeast corner of Veterans and Magnolia, with an approximate firm capacity of 10.6 million gallons per day, and trunk gravity sanitary sewers as follows: • south along Veterans to the City Limits, • west along Bailey Road from Veterans to McLean, then north for approximately 1,000 feet, • east along Bailey from Veterans to Wells Drive, then south to McKeever, • east along Magnolia/John Lizer from the lift station to Pearland Parkway, • north along SH 35 from Magnolia to Swensen, • south along SH 35 from Magnolia to Cowart Creek • east along the high school north access road from SH 35 to Pearland Parkway, and east and west from SH 35 along Industrial Drive. Additionally, as many small existing lift stations as is feasible would be eliminated Advantages: • Lower capital cost for one large/deep regional lift station than aggregate capital cost for three new small/shallow stations. • Lower long -team O&M cost for one larger regional lift station and deep sewers versus three new small/shallow stations. • No long-term O&M cost for existing lift stations that would be eliminated (See Tables 8.2 and 8 3). • Construction of most of the recommended system could be done now, taking advantage of excellent construction market prices • Minimize impacts and disruptions to the area's quickly growing residential and commercial population. • Makes the whole service area more easily developable for existing and future property owners. • All flows pumped once. Disadvantage: • Higher capital cost for deep trunk sewers (See Tables 8.2 and 8.3). Estimated construction cost for this alternative is: $8,801,048 Estimated present worth value for this alternative is: $18,492,425 Page 8 of 10 5.2 FINDINGS Over the next few years the rapid growth and development currently seen in the Veteran's Lift Station Service Area are expected to continue and a "regional' wastewater collection and conveyance system will be required. There are two basic design approaches to regional wastewater collection and conveyance; deep systems that utilize long, continuous, gravity trunk sewers feeding into a deep lift station, and shallow systems consisting of shorter runs of the same size trunk sewers and multiple lift stations Each of these approaches have advantages and disadvantages; amount and type of material and equipment, constructability (mostly based on physical and geotechnical site conditions), anticipated life, possible right-of-way acquisition(s), and operation and maintenance. All of these factors can be quantified in terms of capital and O&M costs to develop present value "life cycle costs ' for each type of system. An example calculation for the life cycle costs is shown in Table 8.1 - Life Cycle Cost Analysis. A comparison of these present values, along with an evaluation of the current construction market, flexibility and adaptability of the system with respect to projected vs. actual growth patterns, and total area serviceable for the money, form the basis of S&B's findings as follows: Continuing development of the Veteran's Lift Station Service Area using the current design approach of shallow sewers and multiple lift stations is not a cost effective solution when compared to an integrated deep gravity sewer/regional lift station system. 6.0 CONCLUSIONS AND RECOMMENDATIONS The Veteran s Lift Station Service Area is expected to experience rapid growth and development over the next few years as evidenced by several subdivisions in the area currently under construction or in planning, and interest from industrial concerns according to information provided by PEDC. Effective planning performed with an understanding of potential population growth, such as what has been done here, will lead to solutions that are cost effective in capital and long-term O&M costs, as well as life expectancy. Therefore, S&B respectfully recommends Alternative No. 2, the regional lift station and trunk gravity sanitary sewer system as outlined in Section 5.1 above, as the most cost effective approach to provide regional sanitary sewer service to the Veteran's Lift Station Service Area. Furthermore, S&B recommends immediate implementation of several key portions of the recommended solution, specifically; the trunk sewers along Veterans Dr. approximately 2,000 feet south of Magnolia St., along Magnolia St. and John Lizer Rd. from Veterans Dr. to Pearland Parkway, and along SH 35 from Swensen St. to Cowart Creek. We feel these projects should proceed immediately so that current developments can take advantage of the deeper gravity systems and be designed without small lift stations that would just have to be abandoned in a few years. In addition, completing these facilities now would take advantage of not only an excellent construction market at this time but would also minimize impacts and disruptions to the area s quickly growing residential and commercial population. The next step in the implementation of the recommended solution is to begin final design of the key portions of the improvements including a detailed survey as well as a geotechnical investigation of the area. Page 9 of 10 Once the key portions of the recommended system have been constructed, the City of Pearland will have positioned the Veteran's Lift Station Seivice Area to be more easily developable for current and future property owners with less capital expense and fewer maintenance concerns. 7.0 EXHIBITS 7.1 EXISTING SCENARIO — YEAR 2000 7.2 EXISTING SCENARIO WITH 100% SEWERED SYSTEM — YEAR 2005 7.3 CITY LIMITS CURRENT GROWTH PATTERN SCENARIO — YEAR 2050 7.4 CITY LIMITS BUILD -OUT SCENARIO — YEAR 2050 7.5 CITY LIMITS AND ETJ CURRENT GROWTH PATTERN SCENARIO YEAR 2070 7.6 CITY LIMITS AND ETJ BUILD -OUT SCENARIO — YEAR 2070 8.0 TABLES 8.1 LIFE CYCLE COST ANALYSIS 8.2 ALTERNATIVE NO. 1 - PRESENT VALUE COST ESTIMATE 8.3 ALTERNATIVE NO. 2 - PRESENT VALUE COST ESTIMATE Sincerely, Mike Harju, P E Project Manager encl. cc: Mr. H.J. Reddish, P.E. — S&B JMH/dcd S \project\u0285-pled-sh35_trnk_ss\admin\ltrs\003-cop-Wertz-vet-Is-Itr-rpt.doc Page 10 of 10 Legend P New Veterans Lift Station P Required for Shallow Trunk Sewer P Transfer Lift Station P Existing Lift Station P To be abandoned N ew Manhole Existing Manhole New Sanitary Sewer Existing Sanitary Sewer Existing Force Main Existing WWTP • Drainage Feature SERVICE, CONDITION S ewered, Developed l j Sewered, Undeveloped U nsewered, Developed Vi2 Unsewered, Undeveloped -� Street Existing Scenario - Year 2000 ZONE Daily Wastewater Flow (GPD/Person) Existing Persons Connected to Sewer Gallons Per Day Acres General Business 20 55 1,100 52 Industrial 20 60 1,200 81 Light Industrial 20 100 2,000 232 Low Density Residential 100 2,914 291,400 547 Medium Density Residential 100 2,239 223,900 146 Parks 5 50 250 65 Public/Semi-Public 20 4,000 80,000 159 TOTAL 9,418 599,850 1,282 •r.•2 tF 50 _- 3.2 03.2 3.2 32 3.23 2 13 .! f 32 323.2• 0 75. 3.2 0 3.2 j 3.2 3 :} . 03.23, 3:21 3.2 3.2 3.2 1323.'1 32 :303.�! 33331.2222 3-'! .23.2�323,2 - 0:g1 3,23.2 3.203.2753.2 j�3.2.23.2�.-3:2 __T 3.23.233.23.23.2 0 Ij3.210 ,3.23.2 32 3.3.2�'. 210: 3.2 3.2 3_2 :0.2_23.23232' 3.23.2 3. •3.2 3-23.2 3. 1 3.2 3. 3.2 3. 3.2 32 3.2 3.2 3.2 •_3.2 3.2 V .-- 3.2 - 3.2 03.23.23.2 3.23.23.23 .23.2 3.2 3.2 3 - 3 10 3.2 3,2 03.2323.2 3.2 32 3.232� 3.2 3.2 32 3 03.2 3.2 4/' ` 0 3.2 3.23.2- f T �3.23.23• 0 e10 10 3.23.2 3.2 3,2323.2 3: •2 32 3.23.2 3.2 3 232 23.23.2 3.23.2 3.23.23.2. 3.2 3.2323.2 3.2 3-2 3.2 3.2 3.2 3.2 0 . 3 12. . -0 20 - 160 _. 98 3.2 3.232�, + 2020 3.2 3.23.23.2 10 3.2 1 3•23.2 3.2 3.2 �, ►1 3.2 3.2 3.2 3.23.23.23.2� r' ?3.2 3.2323.2� 23.23.23.2001� � , � - �i 3.2 3.2 3.232� . • � ��� 2 3.2 3.2 3. 0 � ,�� ��.� 23.2 3.2 ,3.23.2 . 3.23.2 2 3.2 j223 23.20 3.23,20 0 10 � 00 :3.23,2 3.20- 101000 3.23.23.2 3.23.2 2323.2 3•23.23.2 3.2 323'2 3.23.2 18 03.2 3.2 3. 3.2 2 - 3.2 ... �. I_ Feet 1,300 2,600 5,200 7,800 10,400 ASIBIJICIU IIE,1111 rn9$ataief 0 Ki.ertieel (= TeelsOn Exhibit No. 7.1 EXISTING SCENARIO - YEAR 2000 LLegend New Veterans Lift Station P Required for Shallow Trunk Sewer t P Transfer Lift Station P Existing Lift Station P To be abandoned New Manhole Existing Manhole N ew Sanitary Sewer Existing Sanitary Sewer Existing Force Main Existing WWTP Drainage Feature S ewered, Developed S ewered, Undeveloped Street Bailey ci co Co Ifecierat Existing Scenario with 100% Severed System- Year 2005 ZONE Daily Flow Wastewater (GPD/Person) Existing Persons Connected to Sewer Gallons Per Day Acres General Business 20 55 1,100 52 Industrial 20 663 13,260 636 Light Industrial 20 263 5,260 413 Low Density Residential 100 4,033 403,300 1564 Medium Density Residential 100 2,239 223,900 145 Parks 5 50 250 65 Public / Semi -Public 20 4,000 80,000 159 TOTAL 11,303 727,070 3,035 �RUCTIIII 1TD 0 Cowart Creek Haste Hastings ielcl D 0 1,300 2,600 Exhibit No. 7.2 EXISTING SCENARIO WITH 100% SEWERED SYSTEM - YEAR 2005 71.( nf)n Feet 10,400 1 Legend New Veterans Lift Station Required for Shallow Trunk Sewer Transfer Lift Station Existing Lift Station To be abandoned New Manhole Existing Manhole New Sanitary Sewer Existing Sanitary Sewer I Existing Force Main Existing WWTP Drainage Feature Service, CONDITION Sewered, Developed Street Terrell Sharondal Bailey Trans City Limits Current Growth 2050 Pattern Scenario - Year ZONE Daily Wastewater Flow Existing Persons of Coverage Area Existing Persons of Coverage Area Plus Ultimate Undeveloped Areas Gallons per Day Existing Gallons per Day Existing & Ultimate Undeveloped Acres General Business 20 55 75 1,100 1,500 54 Industrial 20 663 1,323 13,260 26,460 636 Light Industrial 20 263 563 5,260 11,260 413 Low Density Residential 100 4,033 14,980 403,300 1,498,000 1,564 Medium Density Residential 100 2,239 3,115 223,900 311,500 144 Parks 5 50 75 250 375 65 Public / Semi -Public 20 4,000 4,000 80,000 80,000 159 TOTAL 11,303 24,131 727,070 1,929,095 3,035 Engineering ;= Management 0 Technology lon►al lfedernt •-�• iiTiiwI•/ •.�allal r, � 13L 111111 lli.I 54 °I'"'-lal/�i Mt :Ill. -. ,4 + -�ra.M rr rnnln • �'n iIrnC el*ragi—INt • arwla►a• 1014.1 1583.8 1517.7 1,300 2,600 Hast I gs ield fi4.• Hastings Exhibit No.. 7-3 CITY LIMITS CURRENT GROWTH PATTERN SCENARIO - YEAR 2050 Feet 10,400 New Sanitary Sewer Existing Sanitary Sewer Existng Force Main ::• •�:• %► 7 -► -- 25 2 7-1 11.3 57.2 60.5 29• *' 63.4 44.2 13113.7 60 3i,74.714,2 26.5•I 59.2 35.6 25.1 31.3 409. •� 29.729.E 60.5 31.1 1•� 6.3 26 10.$9 38 11.E 1010 25 59.1 5.4 10.4 47 13.4 16.E 2229.5 59.4 29.8 47fi0.1 12.6 31.6 29- 66.9 10 23.5 59.4 7.3 30.3 32.210 59.8 60 32.1 15.5 71 58.9 48.1 24 61.3 5.9 28.. 35.3 5.914.4 59.5 15.9 28. 15.91E 28. 31.8 31.8 28 1 59.5 58.2 -- 31.729 0 23.2 1824.1 18.1 2023.7 24 24.2 24. ; 28 C 0 21.215 ..-_ 24.118.1 14.9 17.9 14 923.9 9 2612.999.2926.9 23.923. 2 7 11.55.3 23.914.917.9 17.9 14.9 5 5.85.E 124.7 23.8 12.823.8 14.2 10 10 23.8 23.8 9.55 0.51023.723.82233.7 .5 23.7 23.7 11.9 1 -.�.86.2 59.9 13.1 23.923.91515 32.515 121524 59.349 60 .727 48.4 31.7 23. 29. •07 3.6 14.9 11.8 5718.1 11- 13.518.9 7.88 12.513.330.73021.23.27 City Limits Build -Out Scenario - Year 2050 ZONE Daily Wastewater (GPD/Person) Flow Existing Persons of Area Existing Ultimate Subdivisions, Developed and Undeveloped Areas Gallons per Day Existing Gallons per Day Ultimate Developed and Undeveloped Areas Acres Coverage General Business 20 60 75 1,200 1,500 54 Industrial 20 663 1,340 13,260 26,800 636 Light Industrial 20 293 570 5,860 11,400 413 Low Density Residential 100 4,039 20,929 403,900 2,092,900 1,564 100 2,154 3,114 215,400 311,400 144 Medium Density Residential Parks 5 75 75 375 375 65 Public / Semi -Public 20 4,000 4,000 80,000 80,000 159 TOTAL 11,284 30,103 719,995 2,524,375 3,035 3.23.2 3.23.23.23.2 10 32 3.2 .T` 24.2 10 232 d': 7 10.1 10.212 21.24.7 12 2423.9 35.7 1 12 15.8 21.413.9 1 16.9 15.3 18.24.7 1 30.518.3 2318.6 12.3 18.313.1 7 23.514.7 16,3 14.7 23.614.5 514.722.5 20.69.T' .7 24 22.5 138 12 21.7 ` 2.53. 50.5 8 ' 36.8 33.5 66.5 20.9 21.7 .94.814.7 14.E 14.614,E 36 12.412.4 14.611.8 23.7 719.114.830 2 10 n:.38 .-_. 3.8 �.. .L:71 Exhibit No. 7.4 CITY LIMITS BUILD -OUT SCENARIO - YEAR 2050 Existing Sanitary Sewer Existing Force Main City Limits and ETJ Current Growth Pattern Scenario - Year 2070 ZONE Flow Daily Wastewater (GPD/Person) Existing Persons of Coverage Area Existing Persons Coverage Area Ultimate Undeveloped Areas Plus of Gallons Day per Existing Gallons Existing Ultimate Undeveloped per Day & Acres General Business 20 60 75 1,200 1,500 54 Industrial 20 887 4,007 17,740 80,140 2,494 Light Industrial 20 373 1,293 7,460 25,860 741 Low Density Residential 100 6,617 23,157 661,700 2,315,700 3,313 Medium Density Residential 100 2,154 3,115 215,400 311,500 144 Parks 5 75 75 375 375 65 Public / Semi -Public 20 4,000 4,000 80,000 80,000 159 TOTAL 14,166 35,722 983,875 2,815,075 6,970 Exhibit No. 7.5 CITY LIMITS AND ETJ CURRENT GROWTH PATTERN SCENARIO - YEAR 2070 11.724.2232 , 10 :.711.6 16.59.1 212 212 10.1. 22423.9 35.7 \ - 1 1215.821.413.9 16.9 ' 15.3 - 18.24i .1 30.518.3 2318.6 .12.3 18y318_1, 723777 14.7 23'614.5 514.7 - 20.69.1 36.8 33.5 66.5 21 7 20.9 21.7 g - 14.6 12.412,4 4.814.6 1A636 17.4 14.E 10.1 '1 57 38.E 23.7 14.830 2 10 30.321. 2.8 3 14. 8 118.3 117.9 124.2118.7118.5118.1 285.7 17.423.417.E 17.819.9 18,1� 9.2 23.6 30.3 10.423.2 217,81 . 34.3 !, 7 11.199.4 32.27E 27.34.842.5 11.1 29.1 23.8 20 ' 25 10.3 22.2 23.8 23.2 13.911.4 40.7 12.4 9.8 8.922 21.6 43.2 24.816.3 15.3'. 53.7 45 24.6 29.414.7 10.7 51.6 24.6 22.2 17.9 - 33.3 38.8 51.6 27.1 22 823.4 41.6 1 16.126 8.2 57.5 23.8 23.923.9 49, 32.2 22.8 12.6 373-8373'9 22.8 20.7 5.5 39.4 ti 100 29.5 23 23.424.E 22.9410.8 28.2: 35.314.417.411.811.9 5.3 11.2 58.E 25.5 53.3 106.3 25.5 66.367.1 67 67.16767.1 50 154.2 33.8, 13.813.9 Existing Manhole New Sanitary Sewer Existing Sanitary Sewer Existing Force Main •3� •r.• 7 v•• .. 25,29. 57.2 •fir 7.1 11.3 60.5 63.4 44.213;7.7 14.2 26.5 59.2 35,63125.1 31.3 40. . 29.760 29.E 60.5 31.1 19. •�r. 95? 26. 10.89 3811.61010 25. 9 5.4 59.4 10.44713.4 59.1 16:6. -29 8 60.147.5 31.6 29. 2229.5 66.9 )• 74.5 15.9i8 28. I 31.8. 119.9 31.8 28. 'i 59.5 II 58.2 59.9 31.7 29' 59.3 60 31.7 29. 13.5 13.1 23. i8.949 30.730.727 48.4 23.2 7.88. 12_513.3 City Limits and ETJ Build -Out Scenario - Year 2070 ZONE Daily (GPD/Person) Wastewater Flow Existing PersonsGallons of Coverage Area Existing Subdivisions, Ultimate Developed and Undeveloped Areas per Day Existing Gallons per Day Ultimate Developed and Undeveloped Areas Acres General Business 20 60 75 1,200 1,500 54 Industrial 20 887 4,860 17,740 97,200 2,494 Light Industrial 20 373 1.300 7,460 26,000 741 Low Density Residential 100 6,617 43,308 661,700 4,330,800 3,313 Medium Density Residential 100 2,154 3,114 215,400 311,400 144 Parks 5 75 75 375 375 65 Public / Semi -Public 20 4,000 4,000 80,000 80,000 159 TOTAL 14,166 56,732 983,875 4,847,275 6,970 21.7 20.5 19 53.9 17.9 11.9 11.9 20.4 23.5 12.3 16.624.3 17.7 54.8 11.223.3 19.622.8 47.617.9 30.4 24.E 26.326.2 84.6 44.4 54.8 37.566.4 30.834.7 0 23.2 1824.124.1 18.1 23.7 24 24.224.128_,.! 21.2 15--18.1: 0.323.9 926.99926.923.923'-! 23.9 17.9 17.914.9 5 5.8 129.2 124.7 �7 11.55.3 43.8 12.823.8 14.2 10 23.823.8 9.55, 0.5 23.7__23.7 18.1 1 • 8 23.91515 32.515 121524 623.9 14.9 11.8 118.3 24.7115.1 11.7 B.1 64 16 24.9 16.1. 5.7 s I n 30.430.E 8.719.?P a-4534.8 C�, 14.530.4 37 �81.4 39.d`\Gi } ; 27.835.3♦ 29.8 '. 40.8 '., M a1s �` p 30.360.7 125.333.3 22 g26.1 12 E 29 762.E 24.311.5 330. 31.619.328.828.7 83.2 89.8. 33.530.3 29.8 60,8 2i.2 �6.9 34.E 16.7 2d.6 25.1 21.328.1 27.3 4 • 25.4 30.721,917.369.8 25.111323..9783.E 96,E 13.7 28 44.4 25.530.830.79.811.8 48.5 8.7 320.3 ` I47 41.9 . 30.1 36 23.3 39.9 25,827,2 13.852.89•79•i - 24.32 ` P tl1 7 16.5 29.931.7 128.4 35.930.i . 27.8 34.9 53.213.4 26.5 ' 517-4 49.3 /36.5 11.728.2 37.512.312.9 36.744 59.7 .7 26 16.2 i3,312.865.9 20.320.E 9.9 61.940.E 39.91.9 54.9 12.4 61.437.1 24.2 11.9 15.8 13 27,3 9.6 / 113.3 87.625.6 1415.4 38.939 28.839 29 6 27.216.8 56.5 6 62 2 47.j 25.624.623.9 159.8 42.7 52.237.8 g.3 56.3 56.$ 96.222.E 1 1526,522 99 31.1106'4i3.212.9 53.8 56.3 61.530.7 6' 42.E 6,5 57.5 11.5 60.E 59.E 82.4 , / 13.4 31.6103.3 42.2 41.3 123.939.8 15.9 31.7 27.1 20 6.559.7 24.9 16.3 32.61 17 25.b9.4 29.661.1 127,9 122.1 59.9 9.3 9 4 27.3 _ 32,316.29,3 31 38.65.7 . 57.7 49.1 •�.. i23.5 62.5 12.96191n22:98.986.922: 43.4181`• b_, 127.9123.531.2 .B31,353'g12.2121.937.5122.1 97.524.E 28.E0 128 2 620.7 15 9720,511.E65.54.710.9 44.1122.1 122.1 10.635.1 10.8 1216,823.610 1.1455.811.58.465.527.E 312.2 32 5 6 16.312 9688,7 685,457.766.745.930.5 30.531.217.7 8.647.9 \ib J7.513.5•91i 18.4 30.72026.b10 31160356.414.3 28.4333.70.9 50.3 13.E1033.3153 \33.E49.112.9ip 13.2 173 19.812.5 9,71a 27.3 10 i D23.8 100� C . w4 59 10 f 10 `. 1.613.7 �0 i • 14. 10 \fti 10 Exhibit No. 7.6 CITY LIMITS AND ETJ BUILD -OUT SCENARIO - YEAR 2070 61.5 83.3 47.8 59.210') 1i1 12.8 58.1 Table 8 1 Life Cycle Cost Analysis for New Veterans Lift Station presented in Alternative No. 2 Example Live Cycle Cost Analysis Proposed Capital Costs: $ 1,548,293 Proposed Annual O&M Costs $ 35,745 Present Value : $ 3,039,361 Inflation Rate : 3.30% Municipal Bond Rate : 4.00% n = year Year Proposed Capital Costs Annual Proposed Costs O&M Total Proposed Costs Inflation Inflation Cost Municipal Bond Rate Present Value 0 2004 $ - 1.0000 $ - 1.0000 $ - 1 2005 $1,548,293 $ - $ 1,548,293 1.0330 $ 1,599,387 0.9615 $ 1,537,872 2 2006 $ 35,745 $ 35,745 1.0671 $ 38,143 0.9246 $ 35,266 3 2007 $ 35,745 $ 35,745 1.1023 $ 39,402 0.8890 $ 35,028 4 2008 $ 35,745 $ 35,745 1.1387 $ 40,702 0.8548 $ 34,792 5 2009 $ 35,745 $ 35,745 1.1763 $ 42,045 0.8219 $ 34,558 6 2010 $ 35,745 $ 35,745 1.2151 $ 43,433 0.7903 $ 34,326 7 2011 $ 35,745 $ 35,745 1.2552 $ 44,866 0.7599 $ 34,095 8 2012 $ 35,745 $ 35,745 1.2966 $ 46,347 0.7307 $ 33,865 9 2013 $ 35,745 $ 35,745 1.3394 $ 47,876 0.7026 $ 33,637 10 2014 $ 35,745 $ 35,745 1.3836 $ 49,456 0.6756 $ 33,411 11 2015 $ 35,745 $ 35,745 1.4292 $ 51,088 0.6496 $ 33,186 12 2016 $ 35,745 $ 35,745 1.4764 $ 52,774 0.6246 $ 32,963 13 2017 $ 35,745 $ 35,745 1.5251 $ 54,516 0.6006 $ 32,741 14 2018 $ 35,745 $ 35,745 1.5754 $ 56,315 0.5775 $ 32,520 15 2019 $ 35,745 $ 35,745 1.6274 $ 58,173 0.5553 $ 32,301 16 2020 $ 35,745 $ 35,745 1.6811 $ 60,093 0.5339 $ 32,084 17 2021 $ 35,745 $ 35,745 1.7366 $ 62,076 0.5134 $ 31,868 18 2022 $ 35,745 $ 35,745 1.7939 $ 64,124 0.4936 $ 31,654 19 2023 $ 35,745 $ 35,745 1.8531 $ 66,240 0.4746 $ 31,440 20 2024 $ 35,745 $ 35,745 1.9143 $ 68,426 0.4564 $ 31,229 21 2025 $ 35,745 $ 35,745 1.9775 $ 70,684 0.4388 $ 31,019 22 2026 $ 35,745 $ 35,745 2.0427 $ 73,017 0.4220 $ 30,810 23 2027 $ 35,745 $ 35,745 2.1101 $ 75,426 0.4057 $ 30,603 24 2028 $ 35,745 $ 35,745 21798 $ 77,916 0.3901 $ 30,397 25 2029 $ 35,745 $ 35,745 2.2517 $ 80,487 0.3751 $ 30,192 26 2030 $ 35,745 $ 35,745 2.3260 $ 83,143 0.3607 $ 29,989 27 2031 $ 35,745 $ 35,745 2.4028 $ 85,887 0.3468 $ 29,787 28 2032 $ 35,745 $ 35,745 2 4820 $ 88,721 0.3335 $ 29,586 29 2033 $ 35,745 $ 35,745 2.5639 $ 91,649 0.3207 $ 29,387 30 2034 $ 35,745 $ 35,745 2.6486 $ 94,673 0.3083 $ 29,189 31 2035 $ 35,745 $ 35,745 2.7360 $ 97,797 0.2965 $ 28,993 32 2036 $ 35,745 $ 35,745 2 8262 $ 101,025 0.2851 $ 28,798 33 2037 $ 35,745 $ 35,745 2.9195 $ 104,358 0.2741 $ 28,604 34 2038 $ 35,745 $ 35,745 3.0159 $ 107,802 0.2636 $ 28,411 35 2039 $ 35,745 $ 35,745 3.1154 $ 111,360 0.2534 $ 28,220 36 2040 $ 35,745 $ 35,745 3.2182 $ 115,034 0.2437 $ 28,030 37 2041 $ 35,745 $ 35,745 3.3244 $ 118,831 0 2343 $ 27,842 38 2042 $ 35,745 $ 35,745 3.4341 $ 122,752 0.2253 $ 27,654 39 2043 $ 35,745 $ 35,745 3.5474 $ 126,803 0.2166 $ 27,468 40 2044 $ 35,745 $ 35,745 3.6645 $ 130,987 0.2083 $ 27,283 41 2045 $ 35,745 $ 35,745 3.7854 $ 135,310 0.2003 $ 27,100 42 2046 $ 35,745 $ 35,745 3.9103 $ 139,775 0.1926 $ 26,917 43 2047 $ 35,745 $ 35,745 4.0394 $ 144,388 0.1852 $ 26,736 44 2048 $ 35,745 $ 35,745 4.1727 $ 149,153 0.1780 $ 26,556 45 2049 $ 35,745 $ 35,745 4.3104 $ 154,075 0.1712 $ 26,377 46 2050 $ 35,745 $ 35,745 4.4526 $ 159,159 0.1646 $ 26,200 47 2051 $ 35,745 $ 35,745 4.5995 $ 164,411 0.1583 $ 26,023 48 2052 $ 35,745 $ 35,745 4.7513 $ 169,837 0.1522 $ 25,848 49 2053 $ 35,745 $ 35,745 4.9081 $ 175,441 0.1463 $ 25,674 50 2054 $ 35,745 $ 35,745 5.0701 $ 181,231 0.1407 $ 25,501 51 2055 $ 35,745 $ 35,745 5.2374 $ 187,212 0.1353 $ 25,330 S:\Project\U0285\Eng Rept 01-JMH Deep Sewer Magnolia Service Area !6-May-04 1 of 1 Originated : 5/16/04 Printed: 8/4/2004 CITY OF PEARLAND 2020 - CIP WASTEWATER MASTER PLAN Construction Cost Estimating Workbook Order of Magnitude Construction Year Table 8.3 Alternative No. 2 Construct a Deep Trunk Gravity Sanitary Sewer System with a Regional Lift Station PROJECT NUMBER : U0285 SCENARIO : Deep Sewer Alternative - Build New Veterans Lift Station and Deep Trunk Sewer eliminating existing lift station inth Magnolia Subbasin SERVICE AREA : SWEC Subbasin : Veterans Drive PRESENT VALUE : $ 18,492,425 ESTIMATE DATE: 16-May-04 Facility Location At/Along From To Facility Description Capacity (mgd or mill. g) Diameter (inches) Length (feet) Depth (feet) Number of Manholes Unit Prices Total Rrgfit•of•Way (ac) (type) ($1ft2) Manhole Unit Price (S) Manhole Cost ($) subtotal 2005 2005 2005 2006 2006 2006 2010 2010 2010 2010 2010 New Veterans Lift Station LS 23 Magnolia Street at Weatherford LS Eagle Lift Station LS 20 Veterans Drive at Springfield LS 49 Veterans Drive at Cobblestone 1 LS 52 Veterans Drive at Middle School LS 19 McLean Road at Springfield LS 21 Veterans at Magnolia Oaks LS 24 State Highway 35 at Swensen LS 54 Pearland Parkway at High School LS 66 McLean Road at Caprock New Lift Station Lift Station Abandonment Lift Station Abandonment Lift Station Abandonment Lift Station Abandonment Lift Station Abandonment Lift Station Abandonment Lift Station Abandonment Lift Station Abandonment Lift Station Abandonment Lift Station Abandonment 10.60 0.11 0.11 0.281 0.40 0.32 0.19 0.32 0.16 0.52 0.94 0.56 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 r 2005 2005 2006 2006 2010 2010 2010 2010 2020 2020 2005 2005 2005 2006 2006 2006 2006 2020 2006 2006 2006 2010 2006 2006 System A Veterans Drive Lift Station Veterans Drive Veterans Drive Veterans Drive Bailey Road McLean Road System B Bailey Road (Future) Wells Road System C Veterans Drive CR 935 System D Veteran Drive Lift Station Magnolia Gravity Sewer Magnolia Gravity Sewer State Highway 35 State Highway 35 State Highway 35 State Highway 35 State Highway 35 System E Industrial West System F Industrial East System G High School Gravity Sewer System H State Highway 35 System I John Lizer Pearland Parkway LS Magnolia (18) Cobblestone (5) Springfield (25) Bailey (9) Bailey Veterans Drive (9) Batley (6) Batley (9) Veterans Drive (121) 18 Veterans Drive (38) Railroad Magnolia (19) School Access (47) Oiler (52) Industrial West (56) Industrial East (3) 18 Cobblestone (5) State Highway 35 (3) Springfield (25) Bailey (9) McLean Spring Branch (23) Wells Road (8) Dead End (105) CR 935(121) Dead End (125) 38 Railroad State Highway 35 (56) State Higway 35 (4) Magnolia (19) State Higway 35 (19) Pearland Parkway (129) State Highway 35 (19) School Access (47) Oiler (52) Industrial West (56) Industrial East (3) Cowarts Creek (59) Dead End (29) Dead End (26) Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer 11.4 7.9 Gravity Sewer Pearland Parkway (21) Marys Creek (134) Pearland Parkway (129) Marys Creek (133) Tunnels Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer 79' 7.9 4.1 4.1 Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer Gravity Sewer 2.3 2.3I 36 30I 30 30 24 24 18 18 2.3r 1.6 7.9 7.9 7.9 7.9 1 7.9 7.9 4.1 4.1 0.5 1.0 2.3 1.0 2.3 2.3 18 15 30 30 30 10 513 2,649 1,973 2,700 1,411 30 30. 24 24 12 2,620 3,500 8,420 2,400 135 18', 12 18 m 2,228 1,925 1,981 2,327 24. 24 22 20 15 15 Construction Costs Adjustment Dec-03 6782 May-04 7065 Construction Cost Adjustment: 4.2% Number of Years: 0.34 Present Value Factors Average Inflation Rate: Municipal Bond Rate: Period in Years: Difficulty Factor: Odor Control Cost (S) $ 97,693 17 2,995I 221' 2,085 1,520 2,785 17 13 24 $ 186.39 $ 167.72 5 22 21 1,973'. 2,374 2,610 1,949 18 16 13 11 16 17 17 19 3 1 15: 3 $ 165.06 $ 159.74 $ 124.17 $ 124.17 5 113.91 $ 101.60 0.00 0.12 0.61 $ 38.75 $ 210.52 $ 203.84 $ 567.83 $ 193.83 $ 178.93 0.45 0.62 0.32 0.60 0.80 $ 164.03 1i $ 122.48 $ 98.01 r$ 28.43 5 4 5 34.72 $ 110.83 5 117.08 5 153.29 $ 131.39 1.93 0.55 0.03 0.51 0.34 0.45 0.53 0.69 0.05 0.48 1 1 1 1 1 0.35 5 1.25 1 $ 1.25 $ 1.25 $ 1.25 $ 1.25 $ 1.25 11 0.64 0.45 0.54 1 1 0.60 0.45 1 $ 1.25 $ 1.25 $ 1.25 1.25 1 1.25 1.25 $ 2.50 $ 1.25 $ 1.25 $ 1.25 $ 1.25 $ 1.25 $ 7,601 $ 7,451 7,301 7,001 $ 6,251 6,251 $ 1.25 $ 1.25 1.25 $ 1.25 4,884 $ 4,884 $ 4,284 $ 7,601 7,451 $ 36,505 S 28,004 $ 31,255 Capital Cost Adjustments Construction Cost (S) $ 97,693 $ 18,753 $ 24,422 $ 34,191 5 72,834 5 2,333 $ 11,667 $ 7,451 $ 1.25 $ 1.25 $ 7,151 $ 7,601 5 6,701 $ 6,401 $ 5,951 5,651 5,351 2,333 2,333 $ 4,734 $ 3,533 $ 5,184 7,451 $ 26,804 $ 32,005 $ $ 976,935 $ 12,501 12,501 Basic Engineering Services 10.0% 12,501 12,501 12,501 12,501 12,501 12,501 12,501 1,101,942 97,694 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 9,465 473,752 343,175 366,501 $ 35,706 322,864 432,873 928,333 $ 5,651 $ 21,404 $ 4,434 7,000 $ 14,001 $ 18,937 $ 17,667 $ 25,922 $ 17,737 Collection System Subtotal: GRAND TOTAL: 2000 2005 2010 2015 2020 97,693 1,250 $ 110,194 Special Engineering Services 7.0% 104,668 35,871 $ 482,762 $ 872,843 410,774 68,385 875 875 875 875 875 875 875 875 875 875 946 9,349 47,375 34,318 36,650 448,367 19,395 32,266 77,136 City's Legal and Administralon 5.0% 43,287 92,833 526,965 32,719 225,762 50,213 110,684 237,610 295,626 426,018 10,467 3,587 48,847 625 625 Construction Management 8.0% s 625 625 625 625 663 625 625 625 625 6,544 33,163 24,022 25,655 13,577 22,600 48,276 41,077 44,837 52,696 3,272 22,576 5,021 $ 11,068 23,761 55,097 78,155 1,000 473 30,301 $ 64,983 7,327 2,511 42,602 27,382 $ 769,911 $ 33,793 4,675 1,000 1,000 1,000 1,000 Construction Contingencies 1,000 1,000 1,000 23,688 18,325 9,698 16,143 1,000 1,000 • 146,540 1,875 Commissioning and Start-up 1.0% 1,875 1,875 1,875 1,875 1,875 1,875 1,875 1,875 1,875 21,644 61,099 28,754 31,386 36,888 2,290 15,803 880,105 1 $ 249,637 167,432 3,515 7,748 16,633 20,694 757 7,479 46,417 5,233 1,794 24,138 43,642 20,539 $ 22,418 $ 26,348 1,636 37,900 27,454 29,320 15,516 25,829 165,291 9,769 125 125 125 125 125 Right of Way Cost ($) $ 121,968 125 125 125 125 125 1,420 34,630 11,288 19,167 538,937 125,876 $ 616,073 $ 174,746 $ 117,202 88,113 5,534 11,881 74,267 8,373 2,870 $ 14,781 $ 21,301 13,691 38,621 69,827 32,862 35,869 42,157 2,618 $ 384,955 440,052 83,716 62,938 18,061 14,024 Capital Cost (2004 Vs) 121,968 1,548,293 18,251 18,251 18,251 18,251 18,251 18,251 Capital Cost At Construction ($) 18,251 18,251 18,251 18,251 1,730,804 1,599,387 18,853 rs 71,063 51,476 54,975 29,093 48,430 95 935 64,931 $ 139,250 15,700 5,381 4,738 3,432 3,665 1,940 3,229 72,414 4,017 8,855 19,009 34,081 21,905 615,928 704,084 199,710 133,945 100,701 130,926 61,616 67,255 79,045 4,908 33,864 7,532 16,603 35,642 4,329 9,283 1,047 359 4,828 63,903 41,073 $ 1,154,866 1,320,157 251,148 188,814 125 6,413 8,728 4,108 4,484 5,270 327 2,258 33,113 $ 24,663 $ 33,750 $ 17,638 32,750 502 1,107 2,376 2,956 $ 105,250 30,000 1,688 27,850 24,763 29,088 37,438 2,763 26,063 13,849 141,976 720,053 19,476 19,476 19,476 22,176 22,176 22,176 Annual O&M Cost ($) Present Value (2004 Vs) 22,176 22,176 1,806,402 565,177 1 298,865 500,903 4,260 2,738 76,991 $ 88,010 • 16,743 12,588 671,416 1,451,332 181,768 53,700 727,855 19,000 34,813 24,663 $ 29,675 11303,047 620,385 679,219 801,536 14,306 146,661 768,361 557,305 686,730 363,143 35,745 $ 7,541 7,543 608,633 815,819 2,439,900 $ 305,579 50,206 353,418 32,625 24,363 679,663 801,631 195,468 157,563 161,313 91,809 195,305 369,198 7,688 7,793 7,722 7,609 7,725 7,586 55,472 7,890 8,245 113,088 3,039,361 25,792 25,795 33,452 33,661 33,520 62,538 63,224 64,198 3,510,235 751,874 1,342,139 $ 662,006 724,787 855,310 458,333 650,351 421,398 11,843,366 13,574,170 3,825,223 2,585,949 53,574 594,146 97,968 $ 208,407 393,967 18 898 4,636 3,453 4,725 556,908 2,469 4,585 6,125 14,735 $ 1,680 693,983 $ 449,669 14,146,647 15,953,049 3,947,546 3,142,114 236 3,899 2,620 14,602 180,578 913,197 666,216 742,833 391,591 674,874 3,467 4,072 5,241 387 3,649 5 1,064 $ 1,950 3,453 1,662 4,568 229,535 63,859 895,507 1,415,693 764,272 848,570 1,019,991 66,385 461,146 136,634 83,000 196,088 58,500 58,622 277,252 514,177 512,197 841,049 564,232 18,492,425 5,661,185 3,543,895 1,986,518 3,339,625 2,574,737 Pape 1 of 1 CO1 JMH Deep Sew,' Alternative Magno6a Service Area 16-May-04 als Printed: 8142004 Table 8.2 Alternative No. 1 Continue Development of the Service Area With Shallow Gravity Sewer and Numerous Small Lift Stations CITY OF PEARLAND 2020 - CIP WASTEWATER MASTER PLAN Construction Cost Estimating Workbook Order of Magnitude PROJECT NUMBER : U0285 SCENARIO : Shallow System Alternative - Extend 36-inch Sanitary Sewer at Magnolia and Veterans along Magnolia to State Highway 35 and along Veterans to Bailey SERVICE AREA : SWEC Subbasin : Veterans Dnve PRESENT VALUE : $ 21,388,795 ESTIMATE DATE: 15-Feb-04 Construction Costs Adjustment Dec-03 6782 May-04 7065 Construction Cost Adjustment: 4.2% Number of Years: 0.34 Present Value Factors Average Inflation Rate: Municipal Bond Rate: Period in Years: Difficulty Factor: 5 Facility Location Capacity (mgd or mill. g) Diameter (inches) Length (feet) (feet) Depth Unit Prices •ig -o -"ay Manhole Unit (S) Price Manhole Cost ($) Odor Cost ($) Control Construction ($) Cost Capital Cost Adjustments Right Cost of ($) Way Capital Cost (2004 $'s) Capital At Construction ($) Cost Annual Cost ($) O&M Present (2004 Value S's) Basic Engineering Services 10.0% Special Engineering Services 7.0% City's Legal and Adminlstralon 5.0% Construction Management 8.0% Construction Contingencies 15.0% Commissioning and Start-up 1.0% Total (ac) (type) ($Ift2) Construction Year At/Along From To Facility Description Treatment Plants 1 �S Treatment Plant Subtotal: $ - S - $ - $ - $ - $ - - $ - $ - $ - $ - $ - $ - Lift Stations 2006 New John Lizer Lift Station New Lift Station 6.56 0.56 4 $ 5.00 $ 92,222 $ 687442 $ 68,744 $ 48,121 $ 34,372 $ 54,995 $ 103,116 $ 6,874 $ 121,968 $ 1,125,633 $ 1,194,184 $ 26,523 $ 2,167,437 2006 New Pearland Parkway Lift Station New Lift Station 0.56 0.42 4 $ 5.00 $ 84,097 $ 164,600 $ 16,460 $ 11,522 $ 8,230 $ 13,168 $ 24,690 $ 1,646 $ 91,476 $ 331,791 $ 351,997 $ 10,968 $ 746,496 2010 New Bailey Road Lift Station New Lift Station 5.40 0.56 4 5 5.00 $ 90,651 $ 598,776 $ 59,878 $ 41,914 $ 29,939 $ 47,902 $ 89,816 $ 5,988 $ 121,968 $ 996,182 $ 1,189,493 $ 23,764 $ 1,820,319 2015 LS 23 Magnolia Street at Weatherford Chance Collar Lift Station Rehabilitation 0.11 0.42 $ 20,960 S 2,096 $ 1,467 $ 1,048 $ 1,677 $ 3,144 $ 210 $ 30,602 $ 42,360 $ 7,710 $ 338,050 2020 LS 19 McLean Road at Springfield Springfield Litt Station Rehabilitation 0.19 0.42 $ 33,031 $ 3,303 $ 2,312 $ 1,652 $ 2,642 $ 4,955 $ 330 $ 48,225 $ 77,387 $ 8,020 $ 368,097 2020 LS 20 Veterans Drive at Springfield Lift Station Rehabilitation 0.28 0.42 $ 45,822 $ 4,582 $ 3,208 $ 2,291 $ 3,666 $ 6,873 $ 458 $ 66,900 $ 107,355 $ 8,354 $ 397,872 2020 LS 21 Veterans at Magnolia Oaks Veterans Lift Station Rehabilitation 0.32 0.42 $ 51,595 $ 5,160 $ 3,612 $ 2,580 $ 4,128 $ 7,739 $ 516 $ 75,329 $ 120,880 $ 8,507 $ 411,384 2020 LS 24 State Highway 35 at Swensen Swensen Lift Station Rehabilitation 0.16 0.42 $ 29,073 $ 2,907 $ 2,035 $ 1,454 $ 2,326 $ 4,361 $ 291 $ 42,446 $ 68,113 $ 7,917 $ 358,935 2020 LS 49 Veterans Drive at Cobblestone Cobblestone Lift Station Rehabilitation 0.40 0.42 $ 61,634 $ 6,163 $ 4,314 $ 3,082 $ 4,931 $ 9,245 $ 616 $ 89,986 $ 144,401 $ 8,775 $ 434,974 2020 LS 52 Veterans Drive at Middle School Lift Station Rehabilitation 0.32 0.42 $ 51,077 $ 5,108 $ 3,575 $ 2,554 $ 4,086 $ 7,661 $ 511 $ 74,572 $ 119,666 $ 8,493 $ 410,169 2020 LS 54 Pearland Parkway at High School Pearland Parkway Lift Station Rehabilitation 0.52 0.42 $ 75,606 $ 7,561 $ 5,292 $ 3,780 $ 6,048 $ 11,341 $ 756 $ 110,385 $ 177,136 $ 9,153 $ 467,977 2020 LS Eagle Lift Station Eagle Lift Station Rehabilitation 0.11 0.42 $ 21,438 $ 2,144 $ 1,501 $ 1,072 $ 1,715 $ 3,216 $ 214 $ 31,300 $ 50,227 $ 7,722 $ 341,349 2020 LS 66 McLean Road at Caprock Park Village Lift Station Rehabilitation 0.94 0.42 $ 122,231 5 12,223 $ 8,556 $ 6,112 $ 9,778 $ 18,335 $ 1,222 $ 178,457 $ 286,372 $ 10,440 $ 579,255 Lift Stations: Lift Station Subtotal $ 266,970 $ 1,963,285 $ 196,329 $ 137,430 $ 98,164 $ 157,063 $ 294,493 $ 19,633 $ 335,412 $ 3,201,808 Force Mains 1 1 Force Main Subtotal: $ - $ - $ - $ - $ - $ - S - S - S - $ - $ - 1 $ - I S - Collection System System A 2005 Veterans Drive Lift Station 18 Gravity Sewer 13 7 36 10 12 $ 11916 0.00% $ 1,026 • : i i i 720 2005 Veterans Drive Magnolia (18) Cobblestone Gravity Sewer 1108.92 i • • r i $ 9,229 i 2005 Veterans Drive Cobblestone i i Springfield Gravity Sewer i 1 98.04 • r i i $ 28,722 $ 20 105 $ 14 361 $ 22,978 $ 43,083 $ 2 872 $ 33,113 $ 449 581 $ 463068 • 2006 Veterans Drive S • rin. field 25 Gravit Sewer 7.9 30 1,973 8 $ 76,28 0.45 • i • $ 171,912 $ 17,191 $ 12,034 $ 8,596 $ 13,753 $ 25,787 $ 1,719 $ 24,663• i 402,857 2010 Bailey Road Bailey (9) McLean Gravity Sewer 4.1 24 2,700 15 $ 124.17 0.62 1 $ 1.25 $ 6,251 $ 31,255 $ 366,501 $ 36,650 $ 54,975 $ 3,665 $ 33,750 $ 565,177 $ 674 850 2010 McLean Road Bailey Gravity Sewer i i $ 29,093 i System B 2010 Bailey Road (Future) Veterans Drive (9) Wells Road Gravity Sewer 2.3 18 2,620 17 $ 113.91 0.60 • r r $ 16,143 $ 25,829$ 48,430 $ 3 229 $ 32,750 i • r • : 104 2010 Wells Road Bailey (6) i_• i Gravity Sewer 2 3 18 3,500 0.80 t 301i $ 64,931 $ 4 329 $ 43,750 801,706 System C 2020 Veterans Drive Bailey (9) Gravity Sewer 2 3 18 8,420 13 $ 101 • i $ 139,250 105,250 2020 CR 935 Veterans Drive (121) Dead Gravity Sewer 1 6 15 2,400 i 667 104,668i. $ 15,700 $ 1,047i r r r 1,680 System D 2005 Veteran Drive Connection to SWEC Veterans Drive (18) Gravity Sewer 7 9 30 0.03 108 $ 2,411 $ 1 688 i $ 3,616 • • 36,643 Gravity Sewer Veterans Drive Gravity Sewer i i22,604 i 904 • i $ 49,081 r • • :300 2005 Magnolia (38)Railroad • 2005 Magnolia Gravity Sewer Railroad Tunnels 7 9 30 1 925 10 0.34 2 $ 2.50 7,601 : i i•• $ 43,642 $ 69,827$ 130,926 $ 8 728 $ 37,425 $ 1 303,047i i 2006 State Highway 35 Magnolia (19) School Access (47) Gravity Sewer 7 9 30 1,981 15 $ 173 ' • 0.45 i 0' $ 55,443 $ 3,696 $ 24,763 $ 560,709 • 687,407 2006 . State Highway 35 School Access (47) • Gravity Sewer i r r i29,005 ' • i $ 56,83829,088 i 072 2006 State Highway 35 Oiler (52) Gravity Sewer 7 9 30 2,995 9 $ 109 40 i i • $ 359 771 $ 35,977 $ 25 184 $ 17 989 $ 28,782 $ 53,966 State Highway 35 Industrial West (56) Gravity Sewer i i • i • i r: i : $ 3,241 i ' • 2006 • i State Hi! hwa 35 Industrial East (3) Gravi Sewer 4.1 24 2,085- 0.48 • • • 21,404 $ 2,140 $ 1,498 $ 1,070 $ 1,712 $ 3,211 $ 214 $ 26,063 $ 57,099 $ 91,626 $ 3,649 $ 170,831 System E 2006 : Industrial West State Highway 35 (3) Dead Gravity Sewer 0.5 1,520 6 $ 28.43 i7,000 50,213 5 5,021$ 4,017 $ 7,532 $ 502 19,000 809 • i i r System F 2006 Industrial East State Highway 35 (56) Dead Gravity Sewer 1 i 12 2,785 6 $ 34.72 i 14,001 i • • i • % $ 7 748 $ 5,534 $ 8,855 $ 16,603 $ 1,107 $ 34,813 $ 195,305i i i System G 2010 High School Gravity Sewer State Highway 35 (41 Pearland Gravity Sewer 2.3 18 1,973 10 $ 76.23 i45 1 $ 1.25 $ 3,834 $ 15,337 165,733 $ 16,573 $ 11,601 $ 8,287 $ 13,259 $ 24,860 $ 1,657 •.379,049 System H 2010 State Highway 35 Magnolia (19) Gravity Sewer 1 1 12 2,374 13 $ 104.44 0.54 1 $ 1.25 $ 2 933 $ 14,667• i % 382i $ 21,006 $ 39,390 $ 2,626 $ 29,675 $ 410,441• i r :: $ 1,662 $ 452 001 S stem I 2006 John Lizer State Highway 35 (19) Pearland Parkway (129) Gravity Sewer 2.3 18 2,610 13 $ 127.53 0.60 1 $ 1.25 $ 4,284 $ 21,422 $ 354,272 $ 35,427 $ 24,799 $ 17,714 $ 28,342 $ 53,141 $ 3,543 $ 32,625 $ 546,319 $ 579,590 $ 4,568 $ 715,097 2006 Pearland Parkway Pearland Parkway (129) Marys Creek (133) Gravity Sewer 2.3 18 1,949 9 $ 74.44 0.45 1 $ 1.25 $ 3,684 $ 14,737 $ 159,828 $ 15,983 $ 11,188 $ 7,991 $ 12,786 $ 23,974 $ 1,598 $ 24,363 $ 256,113 $ 271,710 $ 3,411 $ 383,607 Collection System Subtotal: $ - $ 6,355,490 $ 635,549 $ 444,884 $ 317,775 $ 508,439 $ 953,324 $ 63,555 S 679,663 $ 9,895,123 $ 11,703,882 $ 83,000 $ 12,546,481 GRAND TOTAL: $ 266,970 $ 8,318,775 $ 831,878 $ 582,314 $ 415,939 $ 665,502 $ 1,247,816 $ 83,188 $ 1,015,075 $ 13,096,931 $ 15,633,454 $ 229,346 $ 21,388,795 2000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 2005 $ - $ 1,579,746 $ 157,975 $ 110,582 $ 78,987 $ 126,380 $ 236,962 $ 15,797 $ 106,613 $ 2,397,245 $ 2,469,162 $ 12,306 $ 2,870,680 2010 $ 90,651 $ 2,343,296 $ 234,330 $ 164,031 $ 117,165 $ 187,464 $ 351,494 $ 23,433 $ 304,193 $ 3,707,959 $ 4,427,497 $ 46,782 $ 5,248,018 2015 $ - $ 20,960 $ 2,096 $ 1,467 $ 1,048 $ 1,677 $ 3,144 $ 210 $ - $ 30,602 $ 42,360 $ 7,710 $ 338,050 2020 $ - $ 1,545,912 $ 154,591 $ 108,214 $ 77,296 $ 123,673 $ 231,887 $ 15,459 $ 161,313 $ 2,407,799 $ 3,863,811 $ 97,446 $ 5,899,927 S iPro}ect s VU 02851E rig R pl s1 001-JMH Do Neth4g Alternative Magnolia Service Area 16•MayO4. is Page 1 of 1 Orignated: 12/2003 Printed: 8/4F2 4