R2007-160-2007-10-08 RESOLUTION NO. R2007 -160 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING A CONTRACT FOR CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES ASSOCIATED WITH THE KIRBY WATER PLANT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract for construction management and inspection services associated with the Kirby Water Plant, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract for construction management and inspection services associated with the Kirby Water Plant. PASSED, APPROVED and ADOPTED this the 8 day of October, A.D., 2007. t—�c( Q� TOM REID MAYOR ATY.gs UNG Rri ITY S RETARY APPROVED AS TO FORM: o a._.; h. CJ- DARRIN M. COKER CITY ATTORNEY Exhibit "A" Resolution No. R2007 -160 07 -0073 W44071 CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is entered into on October 8, 2007 by and between the City of Pearland "CITY Jones and Carter, Inc. "CONSULTANT The CITY engages the CONSULTANT to perform Construction Management and Construction Inspection Services. (Project #W44071). SECTION I SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A. The CONSULTANT shall perform Construction Management and Construction Inspection Services for the Kirby Water Plant and Transmission Line and Elevated Storage Tank project. See Exhibit A -1, attached, for a detailed SCOPE OF WORK and PROJECT schedule. The PROJECT schedule shall be submitted in digital and hard copy form in the Microsoft Project for Windows format. B. The CONSULTANT acknowledges that the CITY (through its employee handbook) considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and /or collecting reimbursement of expenses made for the benefit of the CITY. The CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY employee to engage in such misconduct. C. The CONSULTANT shall submit all construction generated documents in both hard copy and electronic format. Plans shall be AutoCAD compatible and all other documents shall be Microsoft Office compatible. The software version used shall be compatible to current CITY standards. Other support documents, for example, structural calculations, drainage reports and geotechnical reports, shall be submitted in hard copy only. The CONSULTANT recognizes that all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. D. The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non -owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in limits "Change in Coverage except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT, CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT'S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. E. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the CONSULTANT, his officers, employees, agents, or subcontractors under this CONTRACT. H. All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. -2- SECTION II PERIOD OF SERVICE This CONTRACT will be binding upon execution and end in June 2008. SECTION III CONSULTANT'S COMPENSATION A. The method of payment for this CONTRACT is a Lump Sum contract. Total compensation for the services performed shall be the sum of $200,900.00. B. The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT C. The CITY shall make payments to the CONSULTANT within thirty (30) days after receipt and approval of a detailed invoice. Invoices shall be submitted on a monthly basis. SECTION IV THE CITY'S RESPONSIBILITIES A. The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B. The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize delay in the progress of the CONSULTANT'S work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of the work. The CONSULTANT agrees that the CITY'S inspection, review, acceptance or approval of CONSULTANT'S work shall not relieve CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or its sub consultant(s) or in any way affect the CONSULTANT'S status as an independent contractor of the CITY. SECTION V TERMINATION A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason with or without cause by delivering written notice to CONSULTANT personally or by certified mail at 6335 Gulfton, Suite 100, Houston, Texas 77081 -1169. Immediately after receiving such written notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials -3- supplied by the CITY on or before the 15 day following termination of the CONTRACT. C. In the event of such termination, the CONSULTANT shall be paid for services performed prior to receipt of the written notice of termination. The CITY shall make final payment within sixty (60) days after the CONSULTANT has delivered to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D. If the remuneration scheduled under this contract is based upon a fixed fee or definitely ascertainable sum, the portion of such sum payable shall be proportionate to the percentage of services completed by the CONSULTANT based upon the scope of work. E. In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. F. If the CITY terminates this CONTRACT for cause and /or if the CONTRACTOR breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney's fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under this CONTRACT. To accomplish this, the parties agree to non binding mediation as follows: If a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by non binding mediation of a third party who will be selected by agreement of the parties. SECTION VI ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. SECTION VII COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person, other than a -4- bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability, and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent fee that has been paid. SECTION VIII- SUCCESSORS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. The parties have executed this CONTRACT this 8th day of OctnbPr 2007. CITY 0 PEARLAND, TEXAS SU TANT -5- JC J 0 N E S C A R T E R, I N C. 6335 Gulfton, Suite 100 TEL 713 777 5337 ENGINEERS•PLANNERS•SURVEYORS Houston, Texas 77081 1169 FAX 713 777 5976 AUSTIN DALLAS October 1, 2007 HOUSTON THE WOODLANDS Mr. Trent Epperson Projects Director City of Pearland 3519 Liberty Drive Pearland, TX 77581 Re: Construction Management Services Proposal Kirby Drive Water Plant, Transmission Line and 1 Million Gallon Elevated Storage Tank Pearland, TX Dear Mr. Epperson: Jones Carter, Inc. is pleased to submit this proposal to provide professional Construction Management Services for the referenced capital improvement projects for the City of Pearland. It is our intent to provide CM Services in accordance with the City of Pearland's Standard Construction Management Scope of Services. We will ensure construction document compliance and provide quality assurance quality control throughout the construction period of performance for the referenced projects. Jones Carter, Inc.'s fee for providing construction administration, management and daily inspection services for these projects would be based on hourly rates as shown on the attached schedule. Our Budget Estimate for the services is as follows: Elevate Storage Tank �e Construction Engineer III: 300 hours $88.00/hr. 26,400.00 Field Project Representative III: 300 hours $65.00 /hr. 19,500.00 Dunham Engineering Sub Consultant 30,000.00 Reimbursables 5 5 non nn Subtotal 80,900.00 Water Plant Transmiccinn i.ine Construction Engineer III: 575 hours $88.00 /hr. 50,600.00 Field Project Representative III: 900 hours $65.00 /hr. 58,500.00 Reimbursables 10,900 00 Subtotal 5 12n nn, n nn TOTAL BUDGET ESTIMATE 200,900.00 Smart Engineering. Smart Solutions. www.jonescarter.com r J O N E S &CARTER, I N L. ENGINEERS•PLANNERS•SURVEYORS Mr. Trent Epperson Page 2 October 1, 2007 This estimated budget, based on an estimated construction cost of $5 million, is consistent with our experience on similar projects. The basis of this budget is the simultaneous performance of both projects. The anticipated period of performance is based on 365 calendar days to attain Substantial Completion and an additional 30 calendar days for Final Acceptance. We propose this to be invoiced on an hourly basis Not to Exceed the amount of $200,900.00 without prior written approval of the City. If the projects are not constructed simultaneously, we will need to revise the budget. Dunham Engineering is being engaged to bring additional expertise specific to the Construction of the Elevated Storage Tank. Dunham will assist Jones Carter, Inc. during concrete placement and will be charged with full responsibility for the welding and painting inspection of the steel bowl of the tank. We appreciate the opportunity to present this proposal and look forward to working with you on this proj ect. Sincerely, Larry A. Weppler, P.E. Vice President LAW: js /jlw I: \WP \DOCS \PROPOSAL \Pearland \Water Plant CM Services Proposal 10- 1- 07(2).DOC Enclosure r J 0 N E S &CARTE R, I N C. 6335 Gulfton, Suite 100 TEL 713 777 5337 ENGINEERS PLANNERS• SURVEYORS Houston, Texas 77081 -1169 FAX 713 777 5976 AUSTIN DALLAS HOUSTON THE WOODLANDS SCHEDULE OF HOURLY RATES Effective January 2007 Subject to Annual Revision in January 2008 ENGINEERS SURVEYING Engineer I 75.00 Four -Man Field Crew $145.00 Engineer II 82.00 Three -Man Field Crew $134.00 Engineer III 88.00 Two -Man Field Crew $112.00 Engineer IV $100.00 Four -Man Field Crew with Engineer V $115.00 Robotic Survey System $175.00 Engineer VI $130.00 Three -Man Field Crew with Staff Engineer $140.00 Robotic Survey System $164.00 Project Engineer $150.00 Two -Man Field Crew with Senior Project Engineer $170.00 Robotic Survey System $142.00 Officers, Project Managers $180.00 One -Man Field Crew with Officers- President $225.00 Robotic Survey System $120.00 Four -Man Field Crew with PROJECT REPRESENTATIVES GPS System $205.00 (includes mileage) Three -Man Field Crew with Project Representative I 48.00 GPS System $190.00 Project Representative II 55.00 Two -Man Field Crew with Project Representative III 65.00 GPS System $170.00 Project Representative Coordinator 80.00 One -Man Field Crew with Construction Engineer I 75.00 GPS System $150.00 Construction Engineer II 82.00 Technician I 45.00 Construction Engineer III 88.00 Technician II 60.00 Construction Engineer IV $100.00 Project Surveyor I 65.00 Construction Engineer V $115.00 Project Surveyor II 78.00 Construction Manager $150.00 Project Surveyor III 90.00 Registered Prof. Land Surveyor $130.00 OFFICE PERSONNEL Survey Manager $140.00 Office Assistant 20.00 Clerk 30.00 DESIGNERS /DRAFTING PERSONNEL Engineer's Assistant I 38.00 CAD Operator I 42.00 Engineer's Assistant II 60.00 CAD Operator II 48.00 Secretary I 37.00 CAD Operator III 57.00 Secretary II 45.00 CAD Operator IV 66.00 Secretary III 53.00 CAD Operator V 76.00 Contract Coordinator 55.00 CAD Manager 90.00 Bookkeeper 65.00 Designer I 76.00 Staff Assistant 70.00 Designer II 85.00 Chief Accountant 75.00 Chief Designer 93.00 Design Coordinator 98.00 EQUIPMENT /MILEAGE /FACSIMILES GIS Operator I 55.00 Mileage .49 /mi GIS Operator II 74.00 Facsimiles up to 10 pages 5.00 Computer Tech 40.00 Each additional page over 10 .50 /pg Computer Manager $100.00 ENG \CPC \RATESCH\JC- 2Rev2007 Smart Engineering. Smart Solutions." www.jonescarter.com EXHIBIT A I t fi x Hai ab 1 9 4 1 ii 9, pp ...T E i STANDARD CONSTRUCTION MANAGEMENT SCOPE OF SERVICES FOR Kirby Drive Water Plant and Transmission Line and Kirby Drive 1 Million Gallon Elevated Storage Tank CITY OF PEARLAND A -1 20. Revised 9/20/07 BASIC SERVICES: Construction Manager(s) shall render the following professional services to the OWNER in connection with the construction of the Project. 1. Pre Construction 1.1 Provide constructability review of plans, specifications, and contract documents. Identify construction issues, conflicts, deficiencies, and the adequacy and accuracy of the design. 1.2 Attend Pre -Bid Meeting; provide feedback to City's Project Manager as necessary. 1.3 Chair Pre construction Meeting 1.3.1 Schedule and conduct the pre construction meeting; record and disseminate minutes from pre construction meeting. 1.3.2 Set communications protocol, contract administration procedures and key milestone dates. 1.3.3 Provide agenda for meeting to cover: Pay application procedures, schedule, public notification issues and procedures, utility coordination issues, traffic control, permitting, property owner notification and coordination, temporary facilities, etc. 1.4 Establish baseline schedule and critical path to compare and monitor construction progress and schedule. 2 Construction Administration and Management Services 2.1 Act as the City's on -site representative and provide overall project oversight and direction. 2.2 Meetings: Schedule and conduct construction progress meetings; record minutes from construction progress meetings and distribute to City CITY OF PEARLAND A 20. Revised 9/20/07 Project Manager, Design Engineer and contractor throughout the duration of the project. 2.2.1 Schedule meetings every two weeks, minimum, to review the following: work progress and schedule, outstanding issues, submittals, shop drawings and changes to the work. 2.2.2 Coordinate additional meetings as necessary to discuss and resolve problems and provide guidance in a timely manner. 2.2.2.1 Coordinate /monitor the following: utility relocation activities for compliance, utility installation verification, reporting, record management and as -built drawings. 2.2.2.2 Attend all utility coordination, construction, and scheduling meetings. 2.2.2.3 Obtain copy of ROW permit and prints from Public Works in order to monitor progress per permit /plan. 2.3 Manage Construction 2.3.1 All documentation is required as an electronic /digital format. 2.3.2 As field problems arise, notify the Design Engineer and City Project Manager of proposed solutions to resolve problems. 2.3.3 Review and update as -built documents regularly with contractor. 2.3.4 Monitor and ensure adherence to approved project schedule. Review contractor's schedule monthly, ensure compliance with City's intended schedule, and provide solutions as needed to retain and regain schedule if needed. 2.3.5 Provide alternate project sequencing /scheduling to keep project on schedule. 2.3.6 Prepare monthly summary report of construction activities with outstanding issues outlined for review. Monthly progress information associated with the project will be submitted to the City for review and approval. CITY OF PEARLAND A -3 20. Revised 9/20/07 2.3.7 Record weather conditions on jobsite daily. 2.4 Coordinate work of contractor with external agencies and utility companies. Coordinate contractor's operations with regard to other City contracts and construction as well as with property owners for planned service outages, street closures, and access control issues to properties including notifications. 2.4.1 Verify construction conformance and compliance with TCEQ, NOI and NOT. 2.4.2 Verify construction conformance with permitted activities such as: U.S. Army Corps of Engineers permits, TxDOT roadway permits, and any Railroad agreements. 2.5 Maintain records of all decisions, actions and activities with regard to construction operations (i.e. Change Orders, RFIs and responses, Submittals and responses, Request for Proposals, correspondence, SWPPP inspections.) 3 Construction Inspection Services 3.1 Provide full -time on -site technical observation of Contractor's activities to verify and ensure all work materials, structures, equipment and workmanship comply with the Contract Documents including Addenda, and Change Orders. Maintain good construction practices and professional standards prevailing in the local City, County, and State of Texas. 3.1.1 Notify the City Project Manager if Contractor's work is not in compliance with the Contract Documents or specifications. Notify the City Project Manager and Design Engineer of any failure of the Contractor to take measures to repair and bring work in compliance. 3.1.2 Issue Advisory Notices to Contractor for work that is not in compliance with approved construction documents. CITY OF PEARLAND A 20. Revised 9/20/07 CITY OF PEARLAND A -5 20. Revised 9/20/07 3.1.3 Issue Non Compliance Reports to Contractor if non- conforming work is not brought into compliance or if plan of action to bring work into compliance is not conducted in timely manner. 3.1.4 Inspect and observe the materials and equipment being incorporated into the work to assure that they are handled, stored and installed in accordance with the Contract Documents and specifications. Report to the City Project Manager regarding these activities. 3.2 Identify, record and notify Design Engineer of any problems or failures to meet performance requirements; make recommendation(s) for appropriate solution to the City Project Manager and Design Engineer in a timely manner to minimize delay in the progress of the project. 3.3 Prepare and maintain daily progress log, photographs and records for turnover at completion of project. Provide a copy of daily progress log that includes quantities installed that day and photos to the City Project Manager on a weekly basis. 3.4 Verify contractor has obtained necessary permits and is maintaining any Traffic Control, public notification and Storm Water Pollution Prevention Plans, facilities, equipment or arrangements in accordance with contract documents. 3.5 Attend and participate in progress meetings. 3.6 Gather for your records: names, addresses, telephone numbers and email of all contractors, subcontractors, sub consultants and major suppliers of material and equipment. 3.7 Immediately notify the City Project Manager and Design Engineer in the event of an on -site accident. Record and note conditions, activities and witnesses to the event. 3.8 Keep Citizen Complaint /Resolution Log. 3.9 Consult with City Project Manager and Design Engineer in advance of scheduled major work operations, tests, inspections or start of important phases of project. CITY OF PEARLAND A -6 20. Revised 9/20/07 4 Pay Applications 4.1 Produce and prepare independent progress based pay applications on a monthly basis for all work in compliance with contract documents. Review and verify quantities provided by contractor. 4.1.1 Review work conducted daily on daily inspection reports; Meet weekly with contractor to verify work conducted and bid item quantities; meet monthly to review pay estimate and quantities with contractor 4.1.2 Review progress pay application with Design Engineer for approval or revision prior to submittal to City. 4.1.3 Finalize pay application with signatures from Contractor, Engineer and Construction Manager certifying quantities and amounts. 4.1.4 Provide City Project Manager with one original with all original signatures for processing and payment by the 10t day following the cut off date for pay applications. 4.1.5 Track and record requests for rain or other delays with potential to add to Contract Time daily and monthly. 4.1.6 Provide an independent quantity measurement of work and provide for review as part of pay estimate review. 4.2 Upon completion of the work, prepare a final progress payment including a balancing change order zeroing out all unused quantities. Identify and add additional quantities and make any approved changes to the Contract Time. 4.2.1 Review and coordinate with Design Engineer to provide Engineer's recommendation for Substantial Completion or Final Acceptance. (See Close -out Section) CITY OF PEARLAND A -7 20. Revised 9/20/07 5 Document Control 5.1 Receive, route, track and log all Contractor communications, Submittals, Change Orders, RFIs, Pay Applications and Citizen Complaint /Resolution Log. Communicate with Contractor the status of submittal reviews. Create and keep a submittal and RFI log showing status. Notify City Project Manager, Contractor and Design Engineer of time critical issues. 5.2 Respond to RFIs when such response does not require the Engineer's opinion or expertise or direction from City. 5.3 Assemble and maintain notes, comments, sketches and supportive data relative to the Project to facilitate the revision of drawings to conform to the final as -built conditions. Review Contractor's record keeping periodically to ensure completeness, timeliness and progress. 6 Change Orders 6.1 Prepare and issue request for proposals in a timely manner. Provide RFP and contractor proposal for additional work to City Project Manager and Design Engineer for review and approval. Log and track status of RFP and Responses from Contractor, City and Design Engineer. 6.2 Provide technical opinion on matters acting in City's interest. Evaluate Contractor's response /proposal for cost and time accuracy and price practicality. Negotiate with Contractor on City's behalf if required. 6.3 Prepare Change Order and documentation including signatures of Contractor, Engineer and Construction Manager for delivery to City. 7 Testing Laboratory and Results 7.1 Coordinate testing laboratory requirements with Contractor's schedule. Review test reports for compliance with Contract Documents. Log, track and retain test reports for file. Review results with Contractor. Monitor any corrective action and re- testing for compliance. Maintain compliance with City's specifications 7.1.1 Review lab test reports and log any failures. CITY OF PEARLAND A -8 20. Revised 9/20/07 8 Project Completion and Close out 8.1 A. Provide list of deliverables for substantial completion walk through /inspection. Schedule and conduct project walk through upon receipt of Contractor's notification of substantial completion. Include City Project Manager, Design Engineer and others as directed. Prepare a list of non conforming work based on visual inspections. Record and monitor contractor's corrective efforts and schedule. Schedule final completion inspection for any remaining corrections. B. Coordinate and obtain Design Engineer's sealed completion and Acceptance letter. 8.2 Review and compile any Operation and Maintenance documents required from the Contractor forward to Engineer for review. Collect Contractor's closeout documents to review for completeness and accuracy, including; affidavits of final payment, final pay estimates, as built records, redlines and drawings. Once received, forward to Design Engineer along with any supporting documentation. 8.2.1 Upon completion of close out items, provide recommendation for City's Substantial Completion /Final Acceptance certificate. 8.2.2 Provide indexed project files and redlines to City. 8.3 Conduct Project Close -Out Meeting. 8.4 Prepare and recommend final payment application. Prepare job record logs transmittals, and correspondence reports in an organized file for delivery to City. 8.5 Consult with City on any potential Warranty items requiring repair or replacement. CITY OF PEARLAND A -9 20. Revised 9/20/07 Warranty Period 8.5.1 Schedule, arrange and coordinate a One Year Walk- through of the project to review status of the work 30 days prior to expiration of the One Year Maintenance period. 8.5.2 Provide staff to conduct and participate in the warranty inspections. 8.5.3 Produce list of work not conforming for presentation to the City Project Manager, Design Engineer and Contractor. CITY OF PEARLAND A -10 20. Revised 9/20/07