Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
R2009-157 - 2009-09-28
RESOLUTION NO. R2009-157 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE O'DAY DRAINAGE PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with the O'Day Drainage Project, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to Centertex Constructors in the amount of $425,919.73. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the O'Day Drainage Project. PASSED, APPROVED and ADOPTED this the 28th day of September, A.D., 2009. f c.P TOM REID MAYOR ATTEST: Y NG G C I Y S ETAR APPROVED AS TO FORM: a,:- ,:.~ ~..; ~-.~ ~-; :~ v~.. 'U ~ ~ ~ ~~ DARRIN M. COKER CITY ATTORNEY C.Acsociatea;Inc.• •: Is 8 September 2009• a • • • . . - , Mr Dniy:Caneri ; . . •City.ofPearland;Public•Woks... 3501 Bast:Orange Pearrand,TX-7,758.1 ,•. • :,. .. . i •RE;; . O'Day Road Drainage Improvements• - • •• En-ineer's. P • • • . . . •• g Recoiriinenciation;for� ,. •• . . �'�� , . . • - :Contractor.-Selection•_. . • •i ' As you know,bids were•received•and-opened•foi'the O'Day Road•Draina e•': •• • Improvements Phase' I on 2lowest i $ • � 7-Aug •;:The •tliree•bid responses were as - 1 follows: Constructors '$425-919:73; 'E.P.Brad "Ltd: - • • • • 1 Calca Contracting,:;L;td.- `$4.63`8'84 0d.- i As to the lowest bidder' CeiiterTe •• "(. . x:Constructors),JKC has-no:direct:working:knowledge;- ':of this`firm's capabilities:,: We requested references from'CenterTex andin:the course. : ,. • - ' 1 '. our due_dili"�Brice: • •� - •• ' .of • . •g:_ ,effoit•to-check:these•references•we.found unanimous;of irmation•thai:. :- : .° CenterTex was quali$e'a::arid:capable of providing the'sscope ofwork'iii our'O'Da :Road: project:::,, _ . Y sed on the'comments received about CenterTex'.wor _ .k History•;JKC recommends•that�:_ •,-..:-,...:,the city of Pearland accept`the'lowest:bid proposal.from C.enterTex'.for•the•O'Day �� `� Road :� 'Drainage Improvement Project in,the:amount o • • - pJeC f.$425;919.'7�. •• -I . -Please i do'not�hestate to pall �2$T �3:09.=9100-'- •... (.. )- .1-f,yoii:have zany questions:• ••. , - . . .. JKCA Associates h ic: 57...c„.... son`Chri'stian,:P.E:. _ ' .i>,:•: •��.sJ _...li.is• ... ..:. ..•,,,. 1. 1f' i 1T• 't r` f•. 1�: Otb ) ,i•'•ANNIVERSARY •. .:1 issa•zooa I - •' .2820•FM 517,-E•Dickinson;TX 77539•phone:(28:1)309-9100••'FAX:',(281).309-9300. . O'DAY ROAD DRAINAGE IMPROVEMENTS - PHASE 1 BID No: 0709-49 Centertex Constructors LLC E.P. Item Section Item Item Unit Base Unit No. Reference Description Quantity Units Price Bid Price 1 01505 Mobilization 1 LS 13,650.00 13,650.00 11,000.00 2 01555 Traffic Control 1 LS. 2,310.00 2,310.00 6,000.00 3 02921 Seeding&Fertilizing 1.42 AC 1,260.00 1,789.20 1,060.00 4 01565 Stormwater Pollution Prevention 1 LS 1,260.00 1,260.00 530.00 5 01564 Trench Dewatering 2,100 LF 2.10 4,410.00 0.01 6 00500 Payment,Performance&Maint.Bonds 1 LS 12,810.00 12,810.00 8,100.00 7 02630 24"Storm pipe 172 LF 38.82 6,677.04 52.10 8 02630 30"Storm pipe 30 LF 45.31 1,359.30 61.00 9 02630 42"Storm pipe 83 LF 60.69 5,037.27 70.00 10 02630 48"Storm pipe 1,089 LF 71.99 78,397.11 82.65 11 02630 54"Storm pipe 957 LF 85.17 81,507.69 96.25 12 02631 Type"E"Inlet 7 EA 3,664.50 25,651.50 3,500.00 13 02631 24"Safety End Treatment 4 EA 876.75 3,507.00 850.00 14 02631 30"Safety End Treatment 2 EA 1,212.75 2,425.50 1,160.00 15 02980 Remove&Replace 2"Asphalt Driveway 87 SY 36.75 3,197.25 57.15 16 02330 Regrade Roadside Ditch 2,052 LF 5.93 12,168.36 3.55 17 03315 Interlocking Block Slope Pavement 163 SY 63.00 10,269.00 95.00 TOTAL BASE BID 266,426.22 Page 1 of 21 9/23/2009 O'DAY ROAD DRAINAGE IMPROVEMENTS - ALTERNATE Centertex Constructors LLC E.P. Item Section Item Item Unit Base Unit No. Reference Description Quantity Units Price Bid Price 18 01555 Traffic Control 1 LS 3,675.00 3,675.00 2,940.00 19 01500 Relocation of Existing Water Services 5 EA 525.00 2,625.00 450.00 20 02921 Seeding&Fertilizing 2.45 AC 1,260.00 3,087.00 1,060.00 21 01565 Stomiwater Pollution Prevention 1 LS 2,100.00 2,100.00 810.00 22 02630 18"Storm pipe 16 LF 31.50 504.00 44.00 23 02630 24"Storm pipe 359 LF 38.82 13,936.38 49.00 24 02630 30"Storm pipe 121 LF 45.31 5,482.51 57.85 25 02630 42"Storm pipe 893 LF 60.69 54,196.17 66.85 26 02631 Type"E"Inlet 3 EA 3,664.50 10,993.50 2,800.00 27 02542 Standard Strom Manhole 2 EA 3,606.75 7,213.50 3,700.00 28 02631 24"Safety End Treatment 21 EA 876.75 18,411.75 820.00 29 02631 30"Safety End Treatment 7 EA 1,212.75 8,489.25 1,130.00 30 02980 Remove&Replace 2"Concrete Driveway 228 SY 52.50 11,970.00 77.40_ 31 02980 Remove&Replace 2"Asphalt Driveway 158 SY 36.75 5,806.50 57.15 32 02330 Regrade Roadside Ditch 3,493 LF 3.15 11,002.95 3.55 TOTAL ALTERNATE BID 159,493.51 Centertex E.P.Bradytd. EXTRA PAY ITEMS Constructors LLC Item Section Item Unit Unit No. Reference Description Units Price Price 32 _ 02255 Extra Structural Backfill(Class III granular) CY 20.00 25.00 33 _ 02252 Extra Stabilized Sand CY 20.00 40.00 34 02318 Over Excavation(hand dug) CY 15.00 20.00 35 02318 Over Excavation(Machine dug) CY 10.00 15.00 Page 2 of 21 9/23/2009 BID SUMMARY TOTAL BID(PHASE 1 &ALTERNATE) 425,919.73 457,432.10 Please specify the storm sewer material you intend to use: HDPE,DuroMaxx or RCP: DUROMAXX RCP Page 3 of 21 9/23/2009 ,Brady Ltd. Calco Contracting,LTD. Haddock Co Item Item Base Unit Base Unit Description Quantity Units Bid Price Bid _ _ Price Mobilization 1 LS 11,000.00 33,000.00 33,000.00 1,000.00 Traffic Control 1 LS 6,000.00 2,700.00 2,700.00 2,500.00 Seeding&Fertilizing 1.42 AC 1,505.20 1,100.00 1,562.00 ' 1,500.00 Stormwater Pollution Prevention 1 LS 530.00 900.00 900.00 500.00 Trench Dewatering 2,100 LF 21.00 1.00 2,100.00 25.00 Payment,Performance&Maint.Bonds 1 LS 8,100.00 6,500.00 6,500.00 8,080.00 24"Storm pipe 172 LF 8,961.20 40.00 6,880.00 35.28 30"Storm pipe 30 LF 1,830.00 48.00 _ 1,440.00 42.25 42"Storm pipe 83 LF 5,810.00 70.00 5,810.00 68.26 48"Storm pipe 1,089 LF 90,005.85 83.00 90,387.00 82.86 54"Storm pipe 957 LF 92,111.25 100.00 95,700.00 99.78 Type"E"Inlet 7 EA 24,500.00 3,900.00 27,300.00 2,465.10 24"Safety End Treatment 4 EA 3,400.00 800.00 3,200.00 1,012.93 30"Safety End Treatment 2 EA 2,320.00 1,200.00 2,400.00 1,503.77 Remove&Replace 2"Asphalt Driveway 87 SY 4,972.05 31.00 2,697.00 50.00 Regrade Roadside Ditch 2,052 LF 7,284.60 3.00 6,156.00 3.00 Interlocking Block Slope Pavement 163 SY s 15,485.00 67.00 10,921.00 60.00 TOTAL BASE BID 283,836.15 299,653.00 Page 4 of 21 9/23/2009 .Brady Ltd. Calco Contracting,LTD. Haddock Co Item Item Base Unit Base Unit Description Quantity Units Bid Price Bid Price Traffic Control 1 LS 2,940.00 2,700.00 2,700.00 1.00 Relocation of Existing Water Services 5 EA 2,250.00 500.00 2,500.00 100.00 Seeding&Fertilizing 2.45 AC 2,597.00 1,100.00 2,695.00 1,500.00 Stormwater Pollution Prevention 1 LS 810.00 270.00 270.00 500.00 18"Storm pipe 16 LF 704.00 32.00 512.00 29.77 24"Storm pipe 359 LF 17,591.00 40.00 14,360.00 35.28 30"Storm pipe 121 LF 6,999.85 48.00 5,808.00 42.25 42"Storm pipe 893 LF , 59,697.05 73.00 65,189.00 68.26 Type"E"Inlet 3 EA 8,400.00 3,900.00 11,700.00 2,465.10 Standard Strom Manhole 2 EA 7,400.00 3,900.00 7,800.00 3,027.30 24"Safety End Treatment 21 EA 17,220.00 800.00 16,800.00 1,012.93 30"Safety End Treatment 7 EA 7,910.00 1,200.00 8,400.00 1,288.77 Remove&Replace 2"Concrete Driveway 228 SY 17,647.20 43.00 9,804.00 80.00 Remove&Replace 2"Asphalt Driveway 158 SY 9,029.70 33.00 5,214.00 50.00 Regrade Roadside Ditch 3,493 LF 12,400.15 3.00 10,479.00 2.50 TOTAL ALTERNATE BID 173,595.95 l 164,231.00 Calco Haddock Contracting,LTD. Construction Co.. Item I Unit Unit Description Units I Price Price Extra Structural Backfill(Class III granular) CY 15.00 42.00 Extra Stabilized Sand CY 25.00 32.00 Over Excavation(hand dug) CY 20.00 10.00 Over Excavation(Machine dug) CY 20.00 4.00 Page 5 of 21 9/23/2009 TOTAL BID(PHASE 1 &ALTERNATE) 463,884.00 472,537.79 sewer material you intend to use: HDPE,DuroMaxx or RCP: DUROMAX DURROMAXX Page 6 of 21 9/23/2009 nstruction Co.,Inc. Item Item Base Description , Quantity Units Bid Mobilization 1 LS 1,000.00 Traffic Control 1 LS 2,500.00 Seeding&Fertilizing 1.42 AC 2,130.00 Stormwater Pollution Prevention 1 LS 500.00 Trench Dewatering 2,100 LF 52,500.00 Payment,Performance&Maint.Bonds 1 LS 8,080.00 24"Storm pipe 172 LF 6,068.16 30"Storm pipe 30 LF 1,267.50 42"Storm pipe 83 LF 5,665.58 48"Storm pipe 1,089 LF 90,234.54 54".Storm pipe 957 LF 95,489.46 Type"E"Inlet 7 EA 17,255.70 24"Safety End Treatment 4 EA 4,051.72 30"Safety End Treatment 2 EA 3,007.54 Remove&Replace 2"Asphalt Driveway 87 SY 4,350.00 Regrade Roadside Ditch 2,052 LF 6,156.00 Interlocking Block Slope Pavement 163 SY 9,780.00 TOTAL BASE BID 310,036.20 Page 7 of 21 9/23/2009 nstruction Co.,Inc. Item Item Base Description Quantity Units Bid Traffic Control 1 LS 1.00 Relocation of Existing Water Services 5 EA 500.00 Seeding&Fertilizing 2.45 AC 3,675.00 Stormwater Pollution Prevention 1 LS 500.00 18"Storm pipe 16 LF 476.32 24"Storm pipe 359 LF 12,665.52 30"Storm pipe 121 LF 5,112.25 42"Storm pipe 893 LF 60,956.18 Type"E"Inlet 3 EA 7,395.30 Standard Strom Manhole 2 EA 6,054.60 24"Safety End Treatment 21 EA 21,271.53 30"Safety End Treatment 7 EA 9,021.39 Remove&Replace 2"Concrete Driveway 228 SY 18,240.00 Remove&Replace 2"Asphalt Driveway 158 SY 7,900.00 Regrade Roadside Ditch 3,493 LF 8,732.50 TOTAL ALTERNATE BID 162,501.59 Item Description Units Extra Structural Backfill(Class III granular) CY Extra Stabilized Sand CY Over Excavation(hand dug) CY Over Excavation(Machine dug) CY Page 8 of 21 9/23/2009 TOTAL BID(PHASE 1 &ALTERNATE) sewer material you intend to use: HDPE,DuroMaxx or RCP: Page 9 of 21 9/23/2009 C.E.Barker,LTD. Hurtado Construction Co. Triple B - Item Item Unit Base Unit Base Unit Description Quantity Units Price Bid Price Bid Price Mobilization 1 LS 6,930.00 6,930.00 13,000.00 13,000.00 25,000.00 Traffic Control 1 LS 8,531.25 8,531.25 700.00 700.00 800.00 Seeding&Fertilizing 1.42 AC 1,260.00 1,789.20 1,200.00 1,704.00 1,500.00 Stormwater Pollution Prevention 1 LS 2,756.25 2,756.25 600.00 600.00 1,000.00 Trench Dewatering 2,100 LF 20.00 42,000.00 1.00 2,100.00 0.01 Payment, Performance&Maint.Bonds 1 LS 9,326.10 9,326.10 7,000.00 7,000.00 10,000.00 24"Storm pipe 172 LF 31.87 5,481.64 50.00 8,600.00 47.00 30"Storm pipe 30 LF 38.80 1,164.00 57.00 1,710.00 61.00 42"Storm pipe 83 LF 61.79 5,128.57 77.00 6,391.00 78.00 48"Storm pipe 1,089 LF 74.93 81,598.77 102.00 111,078.00 95.00 54"Storm pipe 957 LF 119.33 114,198.81 120.00 114,840.00 113.00 Type"E"Inlet 7 EA 2,528.40 17,698.80 2,860.00 20,020.00 4,000.00 24"Safety End Treatment 4 EA 942.27 3,769.08 850.00 3,400.00 800.00 30"Safety End Treatment 2 EA 1,192.28 2,384.56 1,000.00 2,000.00 1,200.00 Remove&Replace 2"Asphalt Driveway 87 SY 27.85 2,422.95 57.00 4,959.00 50.00 Regrade Roadside Ditch 2,052 LF 3.26 6,689.52 3.50 7,182.00 5.00 Interlocking Block Slope Pavement 163 SY 73.12 11,918.56 66.00 10,758.00 66.00 TOTAL BASE BID 1 323,788.06 316,042.00 Page 10 of 21 9/23/2009 C.E.Barker,LTD. Hurtado Construction Co. Triple B Item Item Unit Base Unit Base Unit Description Quantity Units Price Bid Price Bid Price Traffic Control 1 LS 4,593.75 4,593.75 100.00 100.00 750.00 Relocation of Existing Water Services 5 EA 546.00 2,730.00 200.00 1,000.00 500.00 Seeding&Fertilizing 2.45 AC 1,260.00 3,087.00 1,200.00 2,940.00 1,500.00 Stormwater Pollution Prevention 1 LS 2,002.35 2,002.35 100.00 100.00 600.00 18"Storm pipe 16 LF 23.56 376.96 37.00 592.00 41.50 24"Storm pipe 359 LF 31.87 11,441.33 50.00 17,950.00_ 47.00 30"Storm pipe 121 LF 38.80 4,694.80 57.00 6,897.00 61.00 42"Storm pipe 893 LF 61.79 55,178.47 70.00 62,510.00 78.00 Type"E"Inlet 3 EA 2,528.40 7,585.20 2,860.00 8,580.00 3,300.00 Standard Strom Manhole 2 EA 3,584.70 7,169.40 2,000.00 4,000.00 4,000.00 24"Safety End Treatment 21 EA 933.45 19,602.45 850.00 17,850.00 800.00 30"Safety End Treatment 7 EA 1,181.25 8,268.75 1,000.00 7,000.00 1,200.00 Remove&Replace 2"Concrete Driveway 228 SY 42.11 9,601.08 50.00 11,400.00 60.00 Remove&Replace 2"Asphalt Driveway 158 SY 27.85 4,400.30 47.00 7,426.00 50.00 Regrade Roadside Ditch 3,493 LF 3.26 11,387.18 4.00 13,972.00 i 5.00 TOTAL ALTERNATE BID 152,119.02 162,317.00 C.E.Barker,LTD. Hurtado Triple B Services, Construction Co. L.L.P. Item Unit Unit Unit Description Units Price Price Price Extra Structural Backfill(Class III granular) CY 25.00 20.00 15.00 Extra Stabilized Sand CY 35.00 25.00 35.00 Over Excavation(hand dug) CY 20.00 50.00 15.00 Over Excavation(Machine dug) CY 15.00 3.00 15.00 Page 11 of 21 9/23/2009 TOTAL BID(PHASE 1 &ALTERNATE) 475,907.08 478,359.00 510,145.00 a sewer material you intend to use: HDPE,DuroMaxx or RCP: HDPE DUROMAXX RCP Page 12 of 21 9/23/2009 Services,L.L.P. Huff&Mitchell,Inc. Item Item Base Unit Base Description Quantity Units Bid Price Bid Mobilization 1 LS 25,000.00 50,000.00 50,000.00 Traffic Control 1 LS 800.00 2,000.00 2,000.00 Seeding&Fertilizing 1.42 AC 2,130.00 1,200.00 1,704.00 Stormwater Pollution Prevention 1 LS 1,000.00 1,500.00 1,500.00 Trench Dewatering 2,100 LF 21.00 0.01 21.00 Payment,Performance&Maint.Bonds 1 LS 10,000.00 10,000.00 10,000.00 24"Storm pipe 172 LF 8,084.00 75.00 12,900.00 30"Storm pipe 30 LF 1,830.00 80.00 2,400.00 42"Storm pipe 83 LF 6,474.00 65.00 5,395.00 48"Storm pipe 1,089 LF 103,455.00 70.00 76,230.00 54"Storm pipe 957 LF 108,141.00 115.00 110,055.00 Type"E"Inlet 7 EA 28,000.00 2,400.00 16,800.00 24"Safety End Treatment 4 EA 3,200.00 1,200.00 4,800.00 30"Safety End Treatment 2 EA 2,400.00 1,300.00 2,600.00 Remove&Replace 2"Asphalt Driveway 87 SY 4,350.00 80.00 6,960.00 Regrade Roadside Ditch 2,052 LF 10,260.00 3.00 6,156.00 Interlocking Block Slope Pavement 163 SY 10,758.00 70.00 11,410.00 TOTAL BASE BID 325,903.00 320,931.00 Page 13 of 21 9/23/2009 Services,L.L.P. Huff&Mitchell,Inc. Item Item Base Unit Base Description Quantity Units Bid Price Bid Traffic Control 1 LS 750.00 2,000.00 2,000.00 Relocation of Existing Water Services 5 EA 2,500.00 250.00 1,250.07)1 Seeding&Fertilizing 2.45 AC 3,675.00 1,200.00 2,940.00 Stormwater Pollution Prevention 1 LS 600.00 1,500.00 1,500.00 18"Storm pipe 16 LF 664.00 150.00 2,400.00_ 24"Storm pipe 359 LF 16,873.00 75.00 26,925.00 30"Storm pipe 121 LF 7,381.00 80.00 9,680.00 42"Storm pipe 893 LF 69,654.00 65.00 58,045.00 Type"E"Inlet 3 EA 9,900.00 2,400.00 7,200.00 Standard Strom Manhole 2 EA 8,000.00 3,200.00 6,400.00 24"Safety End Treatment 21 EA 16,800.00 1,200.00 25,200.00 30"Safety End Treatment 7 EA 8,400.00 1,300.00 9,100.00 Remove&Replace 2"Concrete Driveway 228 SY 13,680.00 55.00 12,540.011 Remove&Replace 2"Asphalt Driveway 158 SY 7,900.00 65.00 10,270.00 Regrade Roadside Ditch 3,493 LF 17,465.00 6.00 20,958.00 TOTAL ALTERNATE BID 184,242.00 196,408.00 Huff&Mitchell, Inc. Item Unit Description Units Price Extra Structural Backfill(Class III granular) CY 40.00 Extra Stabilized Sand CY 30.00 Over Excavation(hand dug) CY 15.00 Over Excavation(Machine dug) CY 20.00 Page 14 of 21 9/23/2009 TOTAL BID(PHASE 1 &ALTERNATE) 517,339.00 sewer material you intend to use: HDPE,DuroMau or RCP: HDPE Page 15 of 21 9/23/2009 Texas Sterling Construction Co. Bay Utilities,LLC Cravens Item Item Unit Base Unit Base Unit Description Quantity Units Price Bid Price Bid __ Price Mobilization 1 LS 12,000.00 12,000.00 2,900.00 2,900.00 6,000.00 Traffic Control 1 LS 10,000.00 10,000.00 6,500.00 6,500.00 6,500.00 Seeding&Fertilizing 1.42 AC 1,200.00 1,704.00 1,400.00 1,988.00 625.00 Stormwater Pollution Prevention 1 LS 5,000.00 5,000.00 2,900.00 2,900.00 1,500.00 Trench Dewatering 2,100 LF 0.10 210.00 15.00 31,500.00 12.00 Payment, Performance&Maint.Bonds 1 LS I 9,000.00 9,000.00 8,100.00 8,100.00 11,500.00 24"Storm pipe 172 LF 50.00 8,600.00 48.00 8,256.00 61.50 30"Storm pipe 30 LF 70.00 2,100.00 56.00 1,680.00 71.00 42"Storm pipe 83 LF 1 85.00 7,055.00 87.00 7,221.00 103.50 48"Storm pipe 1,089 LF 98.00 106,722.00 100.00 108,900.00 116.50 54"Storm pipe 957 LF 117.00 111,969.00 115.00 110,055.00 130.00 Type"E"Inlet 7 EA 4,400.00 30,800.00 4,000.00 28,000.00 3,500.00 24"Safety End Treatment 4 EA 1,250.00 5,000.00 850.00 3,400.00 1,100.00 30"Safety End Treatment 2 EA 1,600.00 3,200.00 1,200.00 2,400.00 1,400.00 Remove&Replace 2"Asphalt Driveway 87 SY l 62.00 5,394.00 42.00 3,654.00 68.00 Regrade Roadside Ditch 2,052 LF 4.00 8,208.00 3.50 7,182.00 3.75 Interlocking Block Slope Pavement 163 SY 53.00 8,639.00 94.00 15,322.00 62.50 TOTAL BASE BID 335,601.00 349,958.00 , Page 16 of 21 9/23/2009 Texas Sterling Construction Co. Bay Utilities,LLC Cravens Item Item Unit Base Unit Base Unit Description Quantity Units Price Bid Price _ Bid Price Traffic Control 1 LS 2,000.00 2,000.00 2,200.00 2,200.00 2,500.00 Relocation of Existing Water Services 5 EA 500.00 2,500.00 _ 750.00 3,750.00 500.00 Seeding&Fertilizing 2.45 AC 1,200.00 2,940.00 1,400.00 3,430.00 625.00 Stormwater Pollution Prevention 1 LS 1,000.00 1,000.00 1,800.00 1,800.00 1,500.00 18"Storm pipe 16 LF 61.00 976.00 39.00 624.00 50.02 24"Storm pipe 359 LF 50.00 17,950.00 48.00 17,232.00 56.00 30"Storm pipe 121 LF 70.00 8,470.00 56.00 6,776.00 65.50 42"Storm pipe 893 LF 80.00 71,440.00 87.00 77,691.00 97.50 Type"E"Inlet 3 EA 3,900.00 11,700.00 3,200.00 9,600.00 2,800.00 1 Standard Strom Manhole 2 EA 4,000.00 8,000.00 4,000.00 8,000.00 3,500.00 24"Safety End Treatment 21 EA 1,250.00 26,250.00 800.00 16,800.00 1,100.00 1 30"Safety End Treatment 7 EA 1,600.00 11,200.00 1,200.00 8,400.00 1,400.00 Remove&Replace 2"Concrete Driveway 228 SY 58.00 13,224.00 44.00 10,032.00 62.50 Remove&Replace 2"Asphalt Driveway 158 SY 60.00 9,480.00 42.00 6,636.00 56.50 Regrade Roadside Ditch 3,493 LF 4.00 13,972.00 7.00 24,451.00 3.75 TOTAL ALTERNATE BID 201,102.00 197,422.00 Texas Sterling Bay Utilities,LLC Cravens Partners, Construction Co. LTD. Item Unit Unit Unit Description Units Price Price _ Price Extra Structural Backfill(Class III granular) CY 20.00 15.00 20.00 Extra Stabilized Sand CY 30.00 22.00 25.00 Over Excavation(hand dug) CY 20.00 15.00 10.00 Over Excavation(Machine dug) CY 10.00 5.00 5.00 Page 17 of 21 9/23/2009 TOTAL BID(PHASE 1 &ALTERNATE) 536,703.00 547,380.00 588,167.32 sewer material you intend to use: HDPE,DuroMax(or RCP: RCP RCP RCP Page 18 of 21 9/23/2009 Partners,LTD. Reddico Construction Company,Inc. Item Item Base Unit Base Description Quantity Units Bid Price Bid Mobilization 1 LS 6,000.00 14,125.00 14,125.00 Traffic Control 1 LS 6,500.00 16,720.00 16,720.00 Seeding&Fertilizing 1.42 AC 887.50 1,340.00 1,902.80 Stormwater Pollution Prevention 1 LS 1,500.00 5,810.00 5,810.00 Trench Dewatering 2,100 LF 25,200.00 6.00 12,600.00 Payment,Performance&Maint.Bonds 1 LS 11,500.00 25,750.00 25,750.00 24"Storm pipe 172 LF 10,578.00 59.90 10,302.80 30"Storm pipe 30 LF 2,130.00 70.70 2,121.00 42"Storm pipe 83 LF 8,590.50 104.00 8,632.00 48"Storm pipe 1,089 LF 126,868.50 119.00 129,591.00 54"Storm pipe 957 LF 124,410.00 133.00 127,281.00 Type"E"Inlet 7 EA 24,500.00 4,245.00 29,715.00 24"Safety End Treatment 4 EA 4,400.00 1,735.00 6,940.00 30"Safety End Treatment 2 EA 2,800.00 1,950.00 3,900.00 Remove&Replace 2"Asphalt Driveway 87 SY 5,916.00 62.00 5,394.00 Regrade Roadside Ditch 2,052 LF 7,695.00 6.15 12,619.80 Interlocking Block Slope Pavement 163 SY 10,187.50 83.30 13,577.90 TOTAL BASE BID 379,663.00 426,982.30 Page 19 of 21 9/23/2009 .Partners,LTD. Reddico Construction Company,Inc. • Item Item Base Unit Base Description Quantity Units Bid Price Bid Traffic Control 1 LS 2,500.00 15,120.00 15,120.00 Relocation of Existing Water Services 5 EA 2,500.00 1,785.00 8,925.00 Seeding&Fertilizing 2.45 AC 1,531.25 1,335.00 3,270.75 Stormwater Pollution Prevention 1 LS 1,500.00 6,380.00 6,380.00 18"Storm pipe 16 LF 800.32 35.70 571.20 24"Storm pipe 359 LF 20,104.00 40.20 14,431.80 30"Storm pipe 121 LF 7,925.50 51.10 6,183.10 42"Storm pipe 893 LF 87,067.50 85.70 76,530.10 Type"E"Inlet 3 EA 8,400.00 3,935.00 11,805.00 Standard Strom Manhole 2 EA 7,000.00 1,365.00 2,730.00 24"Safety End Treatment 21 EA 23,100.00 1,740.00 36,540.00 30"Safety End Treatment 7 EA 9,800.00 1,950.00 13,650.00 Remove&Replace 2"Concrete Driveway 228 SY 14,250.00 69.10 15,754.80 Remove&Replace 2"Asphalt Driveway 158 SY 8,927.00 63.00 9,954.00 Regrade Roadside Ditch 3,493 LF 13,098.75 6.10 21,307.30 TOTAL ALTERNATE BID 208,504.32 243,153.05 Reddico Construction Item Unit Description Units Price Extra Structural Backfill(Class III granular) CY 9.50 Extra Stabilized Sand CY 23.50 Over Excavation(hand dug) CY 38.50 Over Excavation(Machine dug) CY 53.50 Page 20 of 21 9/23/2009 TOTAL BID(PHASE 1 &ALTERNATE) 670,135.35 sewer material you intend to use: HDPE,DuroMaxx or RCP: RCP Page 21 of 21 9/23/2009