Loading...
R2009-138 - 2009-08-31RESOLUTION NO. R2009-138 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATEDWITH THE MCHARD ROAD EXPANSION PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with the McHard Road Expansion Project, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to Beyer Construction, in the amount of $4,892,731.62. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the McHard Expansion Project. PASSED, APPROVED and ADOPTED this the 31St day of August, A.D., 2009. TOM REID MAYOR ATTEST: YO GL ,T CI SEC TARY APPROVED AS TO FORM: ~~.,: h. ~ DARRIN M. COKER CITY ATTORNEY I. City of Pearland,Texas McHard Road Improvements and Reconstruction Project(County Rd.94 to Cullen Blvd) i• LOW BIDDER BEYER CONSTRUCTION, CROSS ROADS INDUSTRIES, TEXAS STERLING REDDICO CONSTRUCTION L.P. INC. CONSTRUCTION CO. TRIPLE B SERVICES,LLP COMPANY,INC. ITEM ITEM DESCRIPTION UNIT QUAN. UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT SITE PREPARATION ITEMS(ALL PROJECT LOCATIONS): 1 Mobilization,complete in place the sum of:(3%MAXIMUM) LS 1 $107,531.72 $107,531.72 $149,000.00 $149,000.00 $140,000.00 $140,000.00 $40,000.00 $40,000.00 $189,000.00 $189,000.00 2 Site Preparation,complete in place the sum of: LS 1 $87,600.00 $87,600.00 $176,000.00 $176,000.00 $137,000.00 $137,000.00 $45,000.00 $45,000.00 $15,000.00 $15,000.00 3 Clearing and Grubbing,complete in place the sum of: AC 5.30 $5,315.00 $28,169.50 $10,000.00 $53,000.00 $4,000.00 $21,200.00 $2.600.00 $13,780.00 $7,000.00 $37,100.00 4 Removal and disposal of existing fences.all types.as indicated on the drawings,complete in place the sum of: LF 550 $2.60 $1,430.00 $4.00 $2,200.00 $5.00 $2,750.00 $2.30 $1,265.00 $5.00 $2,750.00 5 Removal and dispose of existing concrete slab,STA 58+00,100'RT,complete In place the sum of: EA 1 $1,950.00 $1,950.00 $600.00 $600.00 $1,000.00 $1,000.00 $910.00 $910.00 $950.00 $950.00 6 Remove and dispose of existing septic tank and system,STA 58+25, 105'RT.complete in place the sum of: EA 1 $1,103.00 $1,103.00 $400.00 $400.00 $3,500.00 $3,500.00 $2,375.00 $2,375.00 $1,700.00 $1,700.00 7 Traffic control and regulations(Country Place to Cullen),complete in place the sum of: LS 1 $14,900.00 $14,900.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $24,000.00 $24,000.00 $9,100.00 $9,100.00 8 Traffic control and regulations(County Road 94 to Country Place),complete in place the sum of: LS 1 $1,510.00 $1,510.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $24,000.00 $24,000.00 $9,100.00 $9,100.00 9 Flapper,complete in place the sum of: LS 1 $5,400.00 $5,400.00 $2,000.00 $2,000.00 $10,000.00 $10,000.00 $11,000.00 $11,000.00 $16,000.00 $16,000.00 TOTAL SITE PREPARATION ITEMS(ALL PROJECT LOCATIONS): $249,594.22 $423,200.00 $355,450.00 $162,330.00 $280,700.00 STORM WATER POLLUTION PREVENTION ITEMS(COUNTRY PLACE TO CULLEN): 10 Filter Fabric fence,complete in place the sum of: LF 12,600 $0.85 $10,710.00 $1.00 $12,600.00 $1.00 $12,600.00 $1.15 $14,490.00 $1.05 $13,230.00 11 Reinforced Filter Fabric fence,complete in place the sum of: LF 450 $1.05 $472.50 $2.00 $900.00 $1.25 $562.50 $1.25 $562.50 $1.50 . $675.00 12 Rock Filter Dam.complete in place the sum of: EA 2 $170.00 $340.00 $1,200.00 $2,400.00 $1,000.00 $2,000.00 $800.00 $1,600.00 $1,300.00 $2,600.00 13 Inlet Protection Barrier(For existing and proposed Stage 1 and 2 Inlets),complete in place the sum of: EA 39 $135.00 $5,265.00 $20.00 $780.00 $35.00 $1,365.00 $40.00 $1,560.00 $39.00 $1,521.00 14 Stabilized construction exit,complete in place the sum of: EA 2 $625.00 $1,250.00 $1,200.00 $2,400.00 $500.00 $1,000.00 $500.00 $1,000.00 $1,400.00 $2,800.00 _ TOTAL STORM WATER POLLUTION PREVENTION ITEMS(COUNTRY PLACE TO CULLEN): $18,037.50 $19,080.00 $17,527.50 $19,212.50 $20,826.00 PAVING ITEMS(COUNTRY PLACE TO CULLEN): 15 Roadway Fill,complete in place the sum of: CY 11,100 $14.26 $158,286.00 $1.00 $11,100.00 $5.00 $55,500.00 $7.50 $83,250.00 $9.00 $99,900.00 16 Construction Excavation,complete in place the sum of: CY 2,960 $5.00 $14,800.00 $2.00 $5,920.00 $4.00 $11,840.00 $3.00 $8,880.00 $3.00 $8,880.00 17 8'minimum thickness hydrated lime stabilized subgrade.complete In place the sum of: SY 29,020 $1.50 $43,530.00 $1.00 $29,020.00 $2.00 $58,040.00 $1.55 $44,981.00 $1.90 $55,138.00 18 Hydrated lime,complete in place the sum of: TON 670 $125.00 $83,750.00 $130.00 $87,100.00 $130.00 $87,100.00 $130.00 $87,100.00 $150.00 $100,500.00 19 10"minimum thickness reinforced concrete pavement,complete in place the sum of: SY 26,900 $34.35 $924,015.00 $34.00 $914,600.00 $35.00 $941,500.00 $34.50 $928,050.00 $39.80 $1,070,620.00 20 Standard 6°concrete curb,com lete in lace the sum of: LF 19,300 1.65 $31,845.00 $1.00 $19,300.00 $1.00 $19 300.00 $2.50 $48,250.00 $2.25 $43,425.00 21 6'Wide Concrete Sidewalk,4"min.thickness,complete In place the sum of: SF 56,350 $3.50 $197,225.00 $4.00 $225,400.00 $3.00 $169,050.00 $3.40 $191,590.00 $14.00 $788,900.00 22 Adjust existing manhole frame and cover to grade,complete in place the sum of: EA 2 $202.00 $404.00 $100.00 $200.00 $2,000.00 $4,000.00 $170.00 $340.00 $560.00 $1,120.00 23 Block Sod,complete in place the sum of: SY 7200 $2.56 $18,432.00 $2.50 $18,000.00 $3.00 $21,600.00 $4.00 $28,800.00 $3.00 $21,600.00 24 Hydromulch seeding disturbed areas wihtin R.O.W.,complete in place the sum of: AC 7 $1,125.00 $7,875.00 $1,100.00 $7,700.00 $1,200.00 $8,400.00 $1,500.00 $10,500.00 $1,300.00 $9,100.00 25 6-ft tall wood fence,complete in place the sum of: LF 860 $19.50 $16,770.00 $17.00 $14,620.00 $18.00 $15,480.00 $20.00 $17,200.00 $16.80 $14,448.00 26 6-ft tall wood emergency access gate,30-ft wide,complete in place the sum of: EA 1 $1,750.00 $1,750.00 $2,800.00 $2,800.00 $2,000.00 $2,000.00 $5,600.00 $5,600.00 $2,000.00 $2,000.00 27 4-ft tall barbed wire fence,complete in place the sum of: LF 340 $7.75 $2,635.00 $5.00 $1,700.00 $4.00 $1,360.00 $3.50 $1,190.00 $5.60 $1,904.00 28 4-ft tall access gate,complete in place the sum of: EA 2 $480.00 $960.00 $400.00 $800.00 $250.00 $500.00 $1,500.00 $3,000.00 $560.00 $1,120.00 29 8"minimum thickness concrete driveway,complete in place the sum of: SY 325 $46.80 $15210.00 $40.00 $13,000.00 $56.00 $18,200.00 $40.00 $13,000.00 $40.00 $13,000.00 30 Paving Header,complete in place the sum of: LF 90 $7.10 $639.00 $13.00 $1,170.00 $5.00 $450.00 $25.00 $2,250.00 $10.25 $922.50 31 Lane Divider Striping,complete in place the sum of: LF 12,775 $0.37 $4,726.75 $0.37 $4,726.75 $0.30 $3,832.50 $0.40 $5,110.00 $0.40 $5,110.00 32 12"Crosswalk striping.complete in place the sum of: LF 70 $3.25 $227.50 $3.20 $224.00 $3.00 $210.00 $3.60 $252.00 $3.50 $245.00 33 24"Stop Stripe,complete in place the sum of: LF 100 $6.10 $610.00 $6.00 $600.00 $6.00 $600.00 $6.50 $650.00 $6.70 $670.00 34 Wheelchair curb ramps,complete in place the sum of: EA 16 $470.00 $7,520.00 $500.00 $8,000.00 $1,300.00 $20,800.00 $1,400.00 $22,400.00 $950.00 $15,200.00 35 Remove existing drainage easement gates,complete in place the sum of: EA 2 $275.00 $550.00 $30.00 $60.00 $400.00 $800.00 $330.00 $660.00 $550.00 $1,100.00 36 Sidewalkllnlet structure.complete In place the sum of: EA 3 $3,550.00 $10,650.00 $1,200.00 $3,600.00 $7,000.00 $21,000.00 $2,000.00 $6,000.00 $5,300.00 $15,900.00 37 Retaining wall,complete in place the sum of: LF 175 $130.00 $22,750.00 $400.00 $70,000.00 $90.00 $15,750.00 $185.00 $32,375.00 $240.00 $42,000.00 38 4"yellow lane divider striping,complete in place the sum of: LF 3,220 $0.38 $1223.60 $0.37 $1,191.40 $1.00 $3,220.00 $0.45 $1,449.00 $0.40 $1,288.00 39 Raised pavement markers,complete In place the sum of: EA 165 $4.75 $783.75 $4.70 $775.50 $5.00 $825.00 $5.30 $874.50 $5.25 $866.25 40 8°Solid white lane divider stripe,complete in place the sum of: LF 210 $0.86 $180.60 $0.85 $178.50 $1.00 $210.00 $1.00 $210.00 $0.95 $199.50 41 24-Solid white stop stripe,complete In place the sum of: LF 50 $6.10 $305.00 $6.00 $300.00 $6.00 $300.00 $6.75 $337.50 $6.70 $335.00 Bid No.0109-19 NUB 08-051 1 of 5 City of Pearland,Texas McHard Road Improvements and Reconstruction Project(County Rd.94 to Cullen Blvd) '° BEYER CONSTRUCTION, CROSS ROADS INDUSTRIES, TEXAS STERLING REDDICO CONSTRUCTION L.P. INC. CONSTRUCTION CO. TRIPLE B SERVICES,LLP COMPANY,INC. ITEM ITEM DESCRIPTION UNIT QUAN. UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL - NO. PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT , 42 4"Solid yellow median striping,complete In place the sum of: LF 70 $0.38 $26.60 $0.37 $25.90 $1.00 $70.00 $0.45 $31.50 $0.40 $28.00 43 24'solid yellow diagonals,complete in place the sum of: LF 20 $5.95 $119.00 $5.90 $118.00 $6.00 $120.00 $6.65 $133.00 $6.60 $132.00 44 Painted word"ONLY",complete in place the sum of: EA 3 $255.00 $765.00 $250.00 $750.00 $200.00 $600.00 $280.00 $840.00 $280.00 $840.00 45 Painted Arrow,complete in place the sum of: EA 3 $163.00 $489.00 $160.00 $480.00 $200.00 $600.00 $180.00 $540.00 $175.00 $525.00 46 Temporary asphalt pavement transition to Cullen,complete In place the sum of: _ SY 740 $49.00 $36,260.00 $5.00 $3,700.00 $20.00 $14,800.00 $38.00 $28,120.00 $43.00 $31,820.00 TOTAL PAVING ITEMS(COUNTRY PLACE TO CULLEN): $1,605,312.80 $1,447,160.05 $1,498,057.50 $1,573,963.50 $2,348,836.25 DRAINAGE ITEMS(COUNTRY PLACE TO CULLEN): 47 Earthwork(Drainage swales),all depths,complete in place the sum of: LF 6,300 $1.30 $8,190.00 $2.00 $12,600.00 $1.00 $6,300.00 $2.00 $12,600.00 $3.00 $18,900.00 48 Remove existing 24"storm sewer pipe,complete in place the sum of: LF 105 $10.15 $1,065.75 $6.00 $630.00 $7.00 $735.00 $13.00 $1,365.00 $12.00 $1,260.00 49 Remove existing 42"storm sewer pipe,complete in place the sum of: LF 65 $17.25 $1,121.25 $8.00 $520.00 $7.00 $455.00 $15.00 $975.00 $21.80 $1,417.00 50 Remove existing storm manhole,complete in place the sum of: EA 1 $215.00 $215.00 $200.00 $200.00 $300.00 $300.00 $260.00 $260.00 $260.00 $260.00 51 24"RCP,ASTM C76,Class III storm sewer,complete In place the sum of: LF 2,430 $30.85 $74,965.50 $38.00 $92,340.00 $38.00 $92,340.00 $48.50 $117,855.00 $41.75_ $101,452.50 52 30"RCP,ASTM C76,Class III storm sewer.complete inplace the sum of: LF 1,775 $39.40 $69,935.00 $55.00 $97,625.00 $70.00 $124,250.00 $60.00 $106,500.00 $61.00 $108.275.00 53 36"RCP,ASTM C76.Class III storm sewer,complete in place the sum of: LF 330 $58.00 $19.140.00 $65.00 $21,450.00 $100.00 $33,000.00 $80.00 $26,400.00 $86.20 $28,446.00 54 42"RCP,ASTM C76,Class III storm sewer,complete in place the sum of: LF 450 $73.00 $32,850.00 $78.00 $35,100.00 $85.00 $38,250.00 $97.00 $43,650.00 $95.50 $42,975.00 55 48"RCP,ASTM C76,Class III storm sewer,complete in place the sum of: IF 610 $86.00 $52,460.00 $86.00 $52,460.00 $86.00 $52,460.00 $115.00 $70,150.00 $106.20 $64,782.00 56 54"RCP,ASTM C76,Class III storm sewer,complete in place the sum of: LF 620 $101.00 $62,620.00 $100.00 $62,000.00 $100.00 $62,000.00 $132.00 $81,840.00 $120.40 $74,648.00 57 5'x5' RCB Storm Sewer,all depths,complete In place the sum of: LF 1,245 $158.00 $196,710.00 $177.00 $220,365.00 $165.00 $205,425.00 $205.00 $255,225.00 $173.60 $216,132.00 58 6'X5'RCB Storm Sewer,all depths,complete in place the sum of: LF 330 $190.00 $62,700.00 $217.00 $71,610.00 $210.00 $69,300.00 $240.00 $79,200.00 $209.10 $69,003.00 59 36"CGSP storm sewer outfall pipe,complete in place the sum of: LF 70 $76.00 $5,320.00 $70.00 $4,900.00 $80.00 $5,600.00 $88.00 $6,160.00 $70.20 $4,914.00 60 42'CGSP storm sewer outfall pipe,complete in place the sum of: LF 80 $86.25 $6,900.00 $75.00 $6,000.00 $85.00 $6,800.00 $98.00 $7,840.00 $77.20 $6,176.00 61 5"Concrete slope paving.around outfall,complete in place the sum of: SY 180 $76.66 $13,798.80 $35.00 $6,300.00 $46.00 $8,280.00 $38.00 $6.840.00 $40.25 $7,245.00 62 Interlocking blocks at drainage ditch,complete in place the sum of: SY 1,815 $32.40 $58,806.00 $40.00 $72,600.00 $5.00 $9,075.00 $43.00 $78,045.00 $35.20 $63,888.00 63 6'x5'Concrete Wingwall/Drainage Outfall Structure,complete in place the sum of: LS 1 $11,365.00 $11,365.00 $9,500.00 $9,500.00 $20,000.00 $20,000.00 $9,320.00 $9,320.00 $9,100.00 $9,100.00 64 4'Storm Sewer Box Manhole,complete in place the sum of: EA 3 $1,780.00 $5,340.00 $1,800.00 $5,400.00 $2,500.00 $7,500.00 $3,365.00 $10,095.00 $2,000.00 $6,000.00 65 5'Storm Sewer Box Manhole,complete in place the sum of: EA 4 $2,700.00 $10,800.00 $2,900.00 $11,600.00 $3,000.00 $12,000.00 $4,280.00 $17,120.00 $3.140.00 $12,560.00 66 6'Storm Sewer Box Manhole.complete in place the sum of: EA 1 $2,670.00_ $2,670.00 $2,600.00 $2,600.00 $4,000.00 $4,000.00 $4,320.00 $4,320.00 $3,000.00 $3,000.00 67 4'Storm Sewer Box Manhole w/Type"E"Inlet top,complete in place the sum of: EA 1 $2,370.00 $2.370.00 $2,600.00 $2,600.00_ $4,500.00 $4,500.00 $3,850.00 $3,850.00 $3.000.00 $3,000.00 68 5'Storm Sewer Box Manhole w/Type"E"Inlet top,complete in place the sum of: EA 1 $2,365.00 $2,365.00 $2,500.00 $2,500.00 $4,600.00 $4,600.00 $3,800.00 $3,800.00 $3,200.00 $3,200.00 69 5'Storm Sewer Box Manhole w/Type"A"Inlet top,complete In place the sum of: EA 1 $2,325.00 $2,325.00 $2,500.00 $2,500.00 $3,200.00 $3,200.00 $3,650.00 $3,650.00 $3.000.00 $3,000.00 70 6'Storm Sewer Box Manhole w/Type"E"inlet top,complete In place the sum of: EA 1 $2,745.00 $2,745.00 $2,700.00 $2,700.00 $5,600.00 $5,600.00 $4,500.00 $4,500.00 $3,300.00 $3,300.00 71 4'Storm Sewer Box Manhole on RCB storm sewer,w/"E'Inlet top,complete In place the sum of: EA 1 $2,370.00 $2,370.00 $2,200.00 $2,200.00 $3,500.00 $3,500.00 $3,850.00 $3,850.00 $2,800.00 $2,800.00 72 Type"C"Inlet,Including foundation and backfill,complete in place the sum of: EA 13 $2,520.00 $32,760.00 $2,500.00 $32,500.00 $2,600.00 $33,800.00 $3,450.00 $44,850.00 $2,700.00 $35,100.00 73 Type"C"inlet,with open back,including foundation and backfill,complete in place the sum of: EA 1 $3,530.00 $3,530.00 $3,200.00 $3,200.00 $4,600.00 $4,600.00 $4,475.00 $4,475.00 $4,200.00 $4,200.00 74 Type"E"Inlet,Including foundation and backfill,complete in place the sum of: EA 3 $1,780.00 $5,340.00 $1,800.00 $5,400.00 $3,500.00 $10,500.00 $2,680.00 $8,040.00 $2,100.00 $6,300.00 75 Type"E"Inlet on 6'x5'RCB Storm Sewer,complete In place the sum of: EA 2 $1,830.00 $3,660.00 $2,000.00 $4,000.00 $3,500.00 $7,000.00 $2,900.00 $5,800.00 $2,300.00 $4,600.00 76 Type'E"inlet on 5'x5'RCB Storm Sewer,complete in place the sum of: EA 3 $1,615.00 $4,845.00 $1,800.00 $5,400.00 $3,300.00 $9,900.00 $2,625.00 $7,875.00 $2,100.00 $6,300.00 77 7'x4'Storm Junction Box w/Type"E"Inlet top,complete in place the sum of: EA 2 $5,725.00 $11,450.00 $6,200.00 $12,400.00 $9,000.00 $18,000.00 $6,800.00 $13,600.00 $6,600.00 $13.200.00 78 8'x4'Storm Junction Box w/Type"E"Inlet top,complete in place the sum of: EA 1 $6,425.00 $6,425.00 $7,000.00 $7,000.00 $11,000.00 $11,000.00 $7,500.00 $7.500.00 $7,500.00 $7,500.00 79 Trench safety for all storm sewers greater than 5'deep,complete in place the sum of: LF 8 500 $0.31 $2,635.00 $1.00 $8,500.00 $0.10 $850.00 $0.25 $2,125.00 $0.25 $2,125.00 __ TOTAL DRAINAGE ITEMS(COUNTRY PLACE T_O CULLEN): $779,792.30 $876,700.00 $875,120.00 $1,049,675.00 $935,058.50 BRIDGE ITEMS(COUNTRY PLACE TO CULLEN): 80 Abutment Conc.CL C,complete in place the sum of: C.Y. 52 $1,825.00 $94,900.00 $800.00 $41,600.00 $1,250.00 $65,000.00 $508.00 $26,416.00 $835.00 $43,420.00 81 Bent Conc.CL C,complete In place the sum of: C.Y. 50 $1,930.00 $96,500.00 $700.00 $35,000.00 $1,000.00 $50,000.00 $608.00 $30,400.00 $920.00 $46,000.00 82 Approach Slab Conc.CL S,complete in place the sum of: C.Y. 140 $203.00 $28,420.00 $375.00 $52,500.00 $350.00 $49,000.00 $367.00 $51,380.00 $640.00 $89,600.00 83 Ret.Wall(wingwalt)Conc.CL C,complete In place the sum of: C.Y. 31 $965.00 $29,915.00 $525.00_ $16,275.00 $725.00 $22,475.00 $450.00 $13,950.00 $670.00 $20,770.00 84 Conc.Rail Conc.C-203,complete in place the sum of: L.F. 568 $86.25 $48,990.00 $65.00 $36,920.00 $90.00 $51,120.00 $58.00 $32,944.00 $90.00 $51,120.00 85 Pedestrian Metal Rail Conc.PR-1,complete in place the sum of: L.F. 284 $76.10 $21,612.40 $80.00 , $22,720.00 $80.00 $22,720.00 $65.00 $18,460.00 $140.00 $39,760.00 86 Drill Shaft(24-in),complete in place the sum of: L.F. 1,340 $60.30 $80,802.00 $80.00 $107,200.00 $92.00 $123,280.00 $89.00 $119,260.00 $156.00 $209,040.00 87 Drill Shaft(18-in),complete in place the sum of: L.F. 120 $35.20 $4,224.00 $45.00 $5,400.00 $110.00 $13,200.00 $49.00 $5,880.00 $134.00 $16,080.00 Bid No.0109-/9 HDR 08-051 2 of 5 City of Pearland,Texas McHard Road Improvements and Reconstruction Project(County Rd.94 to Cullen Blvd) BEYER CONSTRUCTION, CROSS ROADS INDUSTRIES, TEXAS STERLING REDDICO CONSTRUCTION L.P. INC. CONSTRUCTION CO. TRIPLE B SERVICES,LLP COMPANY,INC. ITEM ITEM DESCRIPTION UNIT QUAN. UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 88 Box Beam Conc.(16"x 48"),complete In place the sum of: L.F. 1,560 $122.00 $190,320.00 $140.00 $218,400.00 $132.00 $205,920.00 $147.00 $229,320.00 $168.00 $262,080.00 89 Box Beam Conc. (16"x 60"),complete in place the sum of: L.F. 520 $122.00 $63,440.00 $140.00 $72,800.00 $150.00 $78,000.00 $149.00 $77,480.00 $168.00 $87.360.00 90 Reinforced Conc.Slab 5 Inch(lop of bridge)CL.S,complete In place the sum of: C.Y. 144 $406.00 $58,464.00 $645.00 $92,880.00 $700.00 $100,800.00 $380.00 $54,720.00 $670.00 $96,480.00 91 Armor Exp.Joints,complete in place the sum of: L.F. 320 $45.65 $14,608.00 $55.00 $17,600.00 $80.00 $25,600.00 $45.00 $14,400.00 $123.00 $39,360.00 92 Metal beam guard rail Including SGTs and terminal anchors,complete in place the sum of: L.F. 360 $28.40 $10,224.00 $30.00 $10,800.00 $55.00 $19,800.00 $55.00 $19,800.00 $33.50 $12,060.00 TOTAL BRIDGE ITEMS(COUNTRY PLACE TO CULLEN): $742,419.40 $730,095.00 $826,915.00 $694,410.00 $1,013,130.00 TRAFFIC SIGNAL AND LIGHTING ITEMS(COUNTRY PLACE AND CR 94): Traffic Signal(FM 2234 @ East&West Countryplace Blvd.),per the drawings,include all qauntities listed on 93 the Summary of Traffic Signal Oaunities,complete In place the sum of: LS 1 $258,000.00 $258,000.00 $265,000.00 $265,000.00 $267,000.00 $267,000.00 $265,000.00 $265,000.00 $280,000.00 $280,000.00 Traffic Signal(FM 2234 @ Smith Ranch Road),per the drawings,include all qauntities listed on the Summary 94 of Traffic Signal Oaunities,complete In place the sum of: LS 1 $148,360.00 $148,360.00 $155,000.00 $155,000.00 $15,000.00 415,000.00 $170,000.00 $170,000.00 $152,000.00 $152,000.00 95 2°Sch 40 conduit for street lighting,complete in place the sum of: LF 12,350 $3.55 $43,842.50 $3.50 $43,225.00 $4.00 $49,400.00 $4.00 $49,400.00 $7.75 $95,712.50 96 Install of pull boxes provided by CenterPoint Energy,complete In place the sum of: EA 65 $215.00 $13,975.00 $210.00 $13,650.00 $220.00 $14,300.00 $220.00 $14,300.00 $217.00 $14,105.00 TOTAL TRAFFIC SIGNAL AND LIGHTING ITEMS(COUNTRY PLACE AND CR 94): $464,177.50 $476,875.00 $345,700.00 $498,700.00 $541,817.50 LANDSCAPING AND IRRIGATION ITEMS(COUNTRY PLACE TO CULLEN): 97 2"Sch.40 PVC water line for irrigation,including all fittings and appurtuences,complete in place the sum of: LF 5,230 $3.05 $15.951.50 $1.42_ $7,426.60 $3.00 $15,690.00 $3.50 $18,305.00 $2.50 $13,075.00 6"PVC,Class 200,conduit for 2"Sch.40 PVC water line for irrigation,under pavement,complete in place the 98 sum of: LF 100 $32.50 $3,250.00 $18.00 $1,800.00 $36.00 $3,600.00 $15.00 $1,500.00 $28.00 $2,800.00 99 2"Sch 40 conduit for irrigation electrical wires,complete in place the sum of: LF 260 $3.55 $923.00 $12.00 $3,120.00 $4.00 $1,040.00 $4.00 $1,040.00 $11.00 $2,860.00 100 2"irrigation line connection to existing water line,all types,at Cullen,complete in place the sum of: EA 1 $305.00 $305.00 $2,900.00 $2,900.00 $1,600.00 $1,600.00 $340.00 $340.00 $3,350.00 $3,350.00 Irrigation line connection to existing water line,inlcuding water meter,by Southwest Water Company,complete 101 in place the sum of: EA 2 $4,060.00 $8,120.00 $600.00 $1,200.00 $1,600.00 $3,200.00 $4,500.00 $9,000.00 $3,350.00 $6,700.00 102 Irrigation control valve assembly,complete in place the sum of: EA 5 $406.00 $2,030.00 $410.00 $2,050.00 $800.00 $4,000.00 $450.00 $2,250.00 $635.00 $3,175.00 103 Irrigation reduced pressure back flow preventer assembly,complete in place the sum of: EA 5 $1.015.00 $5,075.00 $630.00 $3,150.00 $500.00 $2,500.00 $1,200.00 $6,000.00 $780.00 $3,900.00 Irrigation control panel,including irrigation controller,rain sensor,meter box,electrical penal,junction box, conduit,wiring,installation,mounting,foundation,all appurtuences and programming to make the irrigation 104 operational,complete in place LS 2 $3,350.00 $6,700.00 $4,500.00 $9,000.00 $1,400.00 $2,800.00 $3,700.00 $7,400.00 $8,900.00 $17,800.00 105 45 Gal.Live Oak,as shown on Landscaping Plan,complete in place the sum of: EA 22 $365.00 $8,030.00 $216.00 . $4,752.00 $450.00 $9,900.00 $405.00 $8,910.00 $360.00 $7,920.00 106 45 Gal.Crepe Myrtle'Basham's Party Pink',as shown an the Landscaping Plan,completein place the sum of: EA 37 $365.00 $13,505.00 $290.00 $10,730.00 $500.00 $18,500.00 $405.00 $14,985.00 $360.00 $13,320.00 107 45 Gal.Bald Cypress,as shown on the Landscaping Plan,completein place the sum of: EA 10 $365.00 $3,650.00 $216.00 $2,160.00 $500.00 $5,000.00 $405.00 $4,050.00 $380.00 $3,800.00 108 30 Gal.Loblolly Pine,as shown on the Landscaping Plan.completein place the sum of: EA 27 $244.00 $6,588.00 $180.00 $4,860.00 $300.00 $8,100.00 $270.00 $7,290.00 $206.00 $5,562.00 109 Tree drip tubing assembly,for each tree,all types,complete in place the sum of: EA 96 $35.50 $3,408.00 $21.50 $2,064.00 $25.00 $2,400.00 $40.00 $3,840.00 $115.00 $11 04, 0.00 TOTAL LANDSCAPING AND IRRIGATION ITEMS(COUNTRY PLACE TO CULLEN): $77,535.50 $55,212.60 $78,330.00 $84,910.00 $95,302.00 STORM WATER POLLUTION PREVENTION ITEMS(CR 94 TO COUNTRY PLACE): $0.00 110 Filter Fabric fence,complete in place the sum of: LF 6,200 $0.82 $5,084.00 $1.00 $6,200.00 $0.50 $3,100.00 $1.15 $7,130.00 $1.05 $6,510.00 111 Inlet Protection Barrier(For existing and proposed Stage 1 and 2 Inlets),complete in place the sum of: EA 17 $169.00 $2,873.00 $20.00 $340.00 $40.00 $680.00 $40.00 $680.00 $39.15 $665.55 112 Stabilized construction exit,complete In place the sum of: EA 2 $620.00 $1,240.00 $1,200.00 $2,400.00 $1,000.00 $2,000.00 $500.00 $1,000.00 $1,340.00 $2,680.00 TOTAL STORM WATER POLLUTION PREVENTION ITEMS(CR 94 TO COUNTRY PLACE): $9,197.00 $8,940.00 $5,780.00 $8,810.00 $9,855.55 PAVING ITEMS(CR 94 TO COUNTRY PLACE): 113 Roadway Fill,complete In place the sum of: CY 3,040 $12.75 $38,760.00 $7.00 $21,280.00 $19.00 $57,760.00 $7.50 $22,800.00 $9.25 $28,120.00 114 Remove existing pavement SY 17,935 $0.71 $12,733.85 $1.00 $17,935.00 $1.00 $17,935.00 $1.00 $17,935.00 $2.25 $40,353.75 115 8°minimum thickness hydrated lime stabilized subgrade,complete In place the sum of: SY 20,745 $1.40 $29,043.00 $1.00 $20,745.00 $1.50 $31,117.50 $1.55 $32,154.75 $1.90 $39,415.50 116 Hydrated lime,complete in place the sum of: TON 445 $125.00 $55,625.00 $130.00 $57,850.00 $125.00 $55,625.00 $130.00 $57,850.00 $154.00 $68,530.00 117 10"minimum thickness continuous reinforced concrete pavement,complete in place the sum of: SY 17,935 $34.50 $618,757.50 $34.00 $609,790.00 $38.00 $681,530.00 $34.50 $618,757.50 $39.40 $706,639.00 118 Standard 6"concrete curb,complete in place the sum of: LF 12,345 $1.69 $20,863.05 $1.00 $12,345.00 $1.00 $12,345.00 $2.50 $30,862.50 $2.25 $27,776.25 119 Block Sod,complete in place the sum of: SY 9,630 $2.56 $24,652.80 $2.50 $24,075.00 $3.00 $28,890.00 $4.00 $38,520.00 $3.08 $29,660.40 120 8"minimum thickness concrete driveway.complete in place the sum of: SY _ 120 $46.80 $5,616.00 $40.00 $4,800.00 $85.00 $10,200.00 $38.00 $4,560.00 $40.00 $4,800.00 121 Paving Header,complete in place the sum of: LF 125 $7.10 $887.50 $13.00 $1,625.00 $5.00 $625.00 $26.00 $3.250.00 $10.25 $1,281.25 122 Lane Divider Striping,complete in place the sum of: LF 6,165 $0.38 $2,342.70 $0.37 $2.281.05 $0.40 $2,466.00 $0.40 $2,466.00 $0.40 $2,466.00 TOTAL PAVING ITEMS(CR 94 TO COUNTRY PLACE): $809,281.40 $772,726.05 $898,493.50 $829,155.75 $949,042.15 DRAINAGE ITEMS(CR 94 TO COUNTRY PLACE): Did No.01119-19 HDD 08-051 3 of 5 City of Pearland,Texas McHard Road Improvements and Reconstruction Project(County Rd.94 to Cullen Blvd) " BEYER CONSTRUCTION, CROSS ROADS INDUSTRIES, TEXAS STERLING REDDICO CONSTRUCTION L.P. INC. CONSTRUCTION CO. TRIPLE B SERVICES,LLP COMPANY,INC. ITEM ITEM DESCRIPTION UNIT (MAN. UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL _ NO. PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT _ 123 Adjust existing manhole frame and cover to grade,complete in place the sum of: EA 3 $203.00 $609.00 $120.00 $360.00 $500.00 $1,500.00 $350.00 $1,050.00 $500.00 $1,500.00 124 Adjust existing manhole frame with new grate cover to grade,complete in place sum of: _ EA 6 $595.00 $3,570.00 $500.00 $3,000.00 $500.00 $3,000.00 $350.00 $2,100.00 $700.00 $4,200.00 125 Adjust existing Type"C'Inlet to grade,complete in place the sum of: EA 4 $355.00 $1,420.00 $1,500.00 $6,000.00 $500.00 $2,000.00 $350.00 $1,400.00 $1,200.00 $4,800.00 126 Adjust existing Type"C"Inlet with open back to grade,complete in place the sum of: EA 1 $355.00 $355.00 $1,500.00 $1,500.00 $500.00 $500.00 $350.00 $350.00 $1,400.00 $1,400.00 127 Adjust existing Type"B-B"inlet to grade,complete In place the sum of: EA 3 $355.00 $1,065.00 $1,500.00 $4,500.00 $500.00 $1,500.00_ $350.00 $1,050.00 $1,500.00 $4,500.00 128 Adjust existing Type"B-B"inlet with open back to grade,complete in place the sum of: EA 2 $355.00 $710.00 $1,500.00 $3,000.00 $500.00 $1,000.00 $350.00 $700.00 $1,700.00 $3,400.00 129 Type"C"inlet,including foundation and backfill,complete in place the sum of: EA 1 $2,190.00 $2,190.00 $1,800.00 $1,800.00 $2,000.00 $2,000.00 $3,100.00 $3,100.00 $2,700.00 $2,700.00 130 Type"B-B"inlet,including foundation and backfill,complete in place the sum of: EA 1 $2,260.00 $2,260.00 $1,900.00 $1,900.00 $2,000.00 $2,000.00 $2,800.00 $2,800.00 $2,900.00 $2,900.00 131 4'Storm Sewer Box Manhole.complete in place the sum of: EA 1 $2,010.00 $2,010.00 $2,100.00 $2,100.00 $2.000.00 $2,000.00 $2,850.00 $2,850.00 $2,200.00 $2,200.00 132 5'Storm Sewer Box Manhole wl Type"A"Inlet top.complete in place the sum of: EA 1 $2,180.00 $2.180.00 $2,200.00 $2.200.00 $2,700.00 $2,700.00 $3,500.00 $3,500.00 $2,800.00 $2,800.00 133 Trench safety for all storm sewers greater than 5'deep,complete in place the sum of: LF 300 $0.51 $153.00 $1.00 $300.00 $0.10 $30.00 $0.25 $75.00 $0.25 $75.00 TOTAL DRAINAGE ITEMS(CR 94 TO COUNTRY PLACE): $16,522.00 $26,660.00 $18,230.00 $18,975.00 $30,475.00 SUPPLEMENTAL ITEMS(ALL PROJECT LOCATIONS): Well pointing for storm sewer,all sizes,all depths,including all necessary appurtenances,complete in place 134 the sum of: _ L.F. 800 $23.00 $18,400.00 $20.00 $16,000.00 $20.00 $16,000.00 $30.00 $24,000.00 $20.00 $16,000.00 Well pointing for water lines or sanitary sewer,all sizes,all depths,including all necessary appurtenances, 135 complete in place the sum of: L.F. 250 $23.00 $5,750.00 $20.00 $5,000.00 $20.00 $5,000.00 $20.00 $5,000.00 $20.00 $5,000.00 - Wet condition bedding for storm sewer installation,all sizes,all depths,consisting of 12"crushed stone 136 fondatien,complete in place the sum of: _ L.F. 800 $13.00 $10,400.00 $5.00 $4,000.00 $5.00 $4,000.00 $5.00 $4,000.00 $7.50 $6,000.00 Wet condition bedding for water line or sanitary sewer installation,all sizes,all depths,consisting of 12" . 137 crushed stone foundation,complete in place the sum of: L.F. 250 $6.00 $1,500.00 $5.00 $1,250.00 $5.00 $1,250.00 $5.00 $1,250.00 $5.00 $1,250.00 Wet condition bedding for manhole and junction manhole construction,all sizes,all depths,complete in place 138 the sum of: EA. 6 $500.00 $3,000.00 $500.00 $3,000.00 $500.00 $3,000.00 $500.00 $3,000.00 $500.00 $3,000.00 139 Solid sheet shoring system for storm sewer,all sizes,all depths,complete in place the sum of: L.F. 100 $10.00 $1,000.00 $10.00 $1,000.00 $10.00 $1,000.00 $10.00 $1,000.00 $10.00 $1,000.00 140 Installation and removal of piezometers,complete in place the sum of: EA. 8 $100.00 $800.00 $100.00 $800.00 $100.00 $800.00 $100.00 $800.00 $100.00 $800.00 141 Install extra cement stabilized sand backfill,complete in place the sum of: C.Y. 100 $20.00 $2,000.00 $20.00 $2,000.00 $20.00 $2,000.00 $20.00 $2,000.00 $20.00 $2,000.00 142 Install extra bank sand backfill,complete in place the sum of: C.Y. 100 $15.00 $1,500.00 $15.00 $1,500.00 $15.00 $1,500.00 $15.00 $1,500.00 $15.00 $1,500.00 143 Extra Type'D'asphalt pavement,complete in place the sum of: TON 100 $75.00 $7,500.00 $75.00 $7,500.00 $75.00 $7,500.00 $75.00 $7,500.00 $75.00 $7,500.00 144 Extra crushed limestone base material,complete in place the sum of: TON 50 $30.00 $1,500.00 $30.00 $1,500.00 $30.00 $1,500.00 $30.00 $1,500.00 $30.00 $1,500.00 Brace,support and protect utility structures as per Utility Company's requirements,complete in place the sum 145 of: EA. 1 $1,000.00 $1,000.00 $3,500.00 $3,500.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 146 Extra polyethylene service tubing,all sizes,all depths.complete in place the sum of: _ L.F. 100 $7.00 $700.00 $7.00 $700.00 $7.00 $700.00 $7.00 $700.00 $7.00 $700.00 147 8'x8"tapping sleeve and valve with box,complete in place,the sum of: EA. 1 $4,020.00 $4,020.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $4,000.00 $4,000.00 148 Abandon and grout-fill existing storm sewer and culverts,all depths,all sizes,complete in place,the sum of: C.Y. 50 $100.00 $5,000.00 $100.00 $5,000.00 $100.00 $5,000.00 $100.00 $5,000.00 $125.00 $6,250.00 Reinforced filler fabric barrier,Including repair and replacement,and maintenance,complete In place the sum 149 of: L.F. 50 $3.00 $150.00 $3.00 $150.00 $3.00 $150.00 $3.00 $150.00 $3.00 $150.00 Remove and replace existing wood fence,all types,as directed by the site representative,complete in place 150 the sum of: L.F. 900 $18.40 $16,560.00 $18.00 $16,200.00 $18.00 $16,200.00 $18.00 $16,200.00 $18.00 $16,200.00 Remove and replace existing barbed wire fence,as directed by the site representative,complete in place the 151 sum of: L.F. 500 $15.20 $7,600.00 $15.00 $7,500.00 $15.00 $7,500.00 $15.00 $7,500.00 $15.00 $7,500.00 152 Install tree wells,max.18'tall,with looting,complete in place the sum of: L.F. 100 $35.00 $3,500.00 $35.00 $3,500.00 $35.00 $3,500.00 $35.00 $3,500.00 $35.00 $3,500.00 153 12"water line adjustment,Including all fittings and appurtences,complete In place the sum of: _ EA. 1 $2,525.00 $2,525.00 $4,500.00 $4,500.00 $2,500.00 $2,500.00 $2,500.00 $2,500.00 $3,100.00 $3,100.00 154 8"water line adjustment,including all fittings and appurtences,complete In place the sum of: EA. 1 $1,210.00 $1,210.00 $3,700.00 $3,700.00 $1,200.00 $1,200.00 $1,200.00 $1,200.00 $2,000.00 $2,000.00 TOTAL SUPPLEMENTAL ITEMS(ALL PROJECT LOCATIONS): $95,615.00 $91,300.00 $84,300.00 $92,300.00 $89,950.00 EXTRA WORK ITEMS(ALL PROJECT LOCATIONS): 155 Earthwork(Drainage swales),atldepths,complete in place the sum of: LF 2,500 $1.30 $3,250.00 $2.00 $5,000.00- $1.00 $2,500.00 $2.00 $5,000.00 $3.00 $7,500.00 156 5'Storm Sewer Box Manhole wl Type"A"Inlet top,complete in place the sum of: EA 5 $304.00 $1,520.00 $2,500.00 $12,500.00• $3,000.00 $15,000.00 $3,100.00 $15,500.00 $3,700.00 $18,500.00 157 24"RCP,ASTM C76,Class III storm sewer,complete in place the sum of: LF 500 $30.85 $15,425.00 $38.00 $19,000.00 $27.00 $13,500.00 $45.00 $22,500.00 $38.10 $19,050.00 158 Adjust existing manhole frame and cover to grade,complete Inplace the sum of: EA 2 $203.00 $406,00 $120.00 $240.00 $250.00 $500.00 $350.00 $700.00 $500.00 $1,000.00 159 8"minimum thickness concrete driveway,complete in place the sum of: SY 50 $46.80 $2,340.00 $40.00 $2,000.00 $100.00 $5,000.00 $40.00 $2,000.00 $40.00 $2,000.00 160 2'Sch.40 PVC water line for irrigation,including all fittings and appurtuences,complete in place the sum of: LF 500 $3.05 $1,525.00 $1.42 $710.00 $4.00 $2,000.00 $3.50 $1,750.00 $5.00 $2,500.00 161 Trench safety for all storm sewers greater than 5'deep,complete in place the sum of: LF 100 $0.51 $51.00 $1.00 $100.00 $0.10 $10.00 $0.25 $25.00 $0.25 $25.00 Bid No.0109-19 NDB 08-051 • 4 of 5 City of Pearland,Texas McHard Road Improvements and Reconstruction Project(County Rd.94 to Cullen Blvd) BEYER CONSTRUCTION, CROSS ROADS INDUSTRIES, TEXAS STERLING REDDICO CONSTRUCTION L.P. INC. CONSTRUCTION CO. TRIPLE B SERVICES,LLP COMPANY,INC. ITEM ITEM DESCRIPTION UNIT QUAN. UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL _ NO. PRICE AMOUNT PRICE AMOUNT PRICE _ AMOUNT PRICE AMOUNT PRICE AMOUNT 162 45 Gal.Live Oak,as shown on Landscaping Plan,complete In place the sum of: EA 2 $365.00 $730.00 $216.00 $432.00 $450.00 $900.00 $405.00 $810.00 $360.00 $720.00 TOTAL EXTRA WORK ITEMS(ALL PROJECT LOCATIONS)! - $25,247.00 $39,982.00 $39,410.00 $48,285.00 $51,295.00 . SUMMARY (A) TOTAL SITE PREPARATION ITEMS(ALL PROJECT LOCATIONS), $249,594.22 • $423,200.00 $355,450.00 $162,330.00 $280,700.00 (B) TOTAL STORM WATER SEWER POLLUTION PREVENTION ITEMS(COUNTRY PLACE TO CULLEN), $18,037.50 $19,080.00 $17,527.50 $19,212.50 $20,826.00 (C) TOTAL PAVING ITEMS(COUNTRY PLACE TO CULLEN $1.605,312.80 $1,447,160.05 $1,498,057.50 $1,573,963.50 $2,348,836.25 (D) TOTAL DRAINAGE ITEMS(COUNTRY PLACE TO CULLEN) $779,792.30 $876,700.00 $875,120.00 $1,049,675.00 $935.058.50 (E) TOTAL BRIDGE ITEMS(COUNTRY PLACE TO CULLEN), $742,419.40 $730,095.00 $826,915.00 $694,410.00 $1,013,130.00 (F) TOTAL TRAFFIC SIGNAL AND LIGHTING ITEMS(COUNTRY PLACE AND CR 94)! _ $464,177.50 $476,875.00 $345,700.00 $498,700.00 $541,817.50 (G) TOTAL LANDSCAPING AND IRRIGATION ITEMS(COUNTRY PLACE TO CULLEN)_ $77,535.50 $55,212.60 _ $78,330.00 $84,910.00 $95,302.00 (H) TOTAL STORM WATER POLLUTION PREVENTION ITEMS(CR 94 TO COUNTRY PLACE)! $9,197.00 $8,940.00 $5,780.00 $8,810.00 $9,855.55 Ill TOTAL PAVING ITEMS(CR 94 TO COUNTRY PLACE)! $809,281.40 $772,726.05 $898,493.50 $829,155.75 $949,042.15- (J) TOTAL DRAINAGE ITEMS(CR 94 TO COUNTRY PLACEL $16,522.00 $26,660.00 • $18,230.00 $18,975.00 $30,475.00 (K) TOTAL SUPPLEMENTAL ITEMS(ALL PROJECT LOCATIONS), $95,615.00 $91,300.00 $84,300.00 $92,300.00 $89,950.00 ' (L) TOTAL EXTRA WORK ITEMS(ALL PROJECT LOCATIONS)! $25,247.00 $39,982.00_ $39,410.00 $48,285.00 $51,295.00 TOTAL BASE BID ITEMS(ITEMS A-J), $4,771,869.62 $4,836,648.70 $4,919,603.50 $4,940,141.75 $6,225,042.95 TOTAL BASE BID,SUPPLEMENTAL,&EXTRA WORK(ITEMS A-L) _$4,892,731.62 $4,967,930.70 $5,043,313.50 $5,080,726.75 $6,366,287.95 Bid Na.0109-19 NDB 08-051 5 of 5 McHard Road Extension(Country Place Blvd.to Cullen) Revised Cost Estimate 4-1-09 I 1 I ITEM ITEM DESCRIPTION UNIT QUAN. 100%Submittal Engineers Cullen Project NO. _ Estimate Project STP 2009(283) Magnolia Road Expansion Unit Price Cost Unit Price Cost Unit Price Cost SITE PREPERATION ITEMS: 1 Mobilization,complete in place the sum of:(3%MAXIMUM) LS 1 $50,000.00 $50,000_S165,000.00 $165.000 $150,000.00 $150,000 2 Site Preperation,complete in place the sum of: LS 1 $25,000.00 $25,000 S25,000.00 $25,000 $25,000.00 $25,000 3 Clearing and Grubbing,complete in place the sum of: AC 5.1 $5.000.00 $25,500 S5 000.00 $25.500 $5,066.67 $25.840 Removal and disposal of existing fences,all types,as indicated on the drawings,complete in 4 place the sum of: LF 550, $7.00 $3,850 $7.00 $3,850 $3.19 $1,753 Removal and stockpile of existing concrete slab,STA 58+00,100'RT,complete in place the 5 sum of: EA 1 $1,600.00 $1,600 $1,600.00 $1,600 $1,600.00 $1,600 Remove and dispose of existing septic tank and system,STA 58+25, 105'RT,complete in 6 "place the sum of: EA 1 $500.00 $500 $500.i i $500 $500.00 $500 7 Traffic control and regulations,complete in place the sum of: LS 1 $20.000.00 $20,000 520,000.00 $20,000 $20,000.00 $20,000 8 Flagger,complete in place the sum of: LS 1 $20,880.00 $20,880 $20,880.00 $20,880 $20,880,00 $20,880 9 Project Signs,per specification,complete in place the sum of: LS 1 $800.00 $800 $800.00 $800 $800.00 $eoo TOTAL SITE PREPERATION ITEMS: $148,130.00 $263,130.00 $246,372.67 STORM WATER POLLUTION PREVENTION ITEMS: 10 Filter Fabric fence,complete in place the sum of: LF 12,600 $1.20 $15,120 $2.96 $37,338 $0.88 $11,130 11 Reinforced Filter Fabric fence,complete in place the sum of: LF 450 $2.00 $soo $2.00 $900 $1.22 $548 12 Rock Fitter Dam,complete in place the sum of: EA 2 $z.000.00 $4,000 $2,000.00 $4,000 $2,000,00 $4 000 Inlet Protection Barrier(For existing and proposed Stage 1 and 2 Inlets),complete in place the 13 sum of: EA 39 $70.00 $2,730 $67.07 $2,616 $70.00 $2,730 14 Stabilized construction exit,complete in place the sum of: EA 2 $2,500.00 $5,000 S2.500.00 $5,000 >2s00.00 $5,000 TOTAL STORM WATER POLLUTION PREVENTION ITEMS: $27,750.00 $49,853.60 $23,407.50 PAVING ITEMS: 15 Roadway Fill,complete in place the sum of: CY 11,100 $8.50 $94,350 $5.53 $61,420 $5.04 $55,981 16 Construction Excavation,complete in place the sum of: CY 2,960 $10.00 $29,600 $2.90 $8,594 $6.00 $17,760 17 8"minimum thickness hydrated lime stabilized subgrade,complete in place the sum of: SY 29,020 $5.15 $149,453 $1.49 $43,240 $1.96 $56,879 18 Hydrated lime,complete in place the sum of: TON 670 $140.00 $93,800 $143.67 $96,257 $138.33 $92,683 19 10"minimum thickness reinforced concrete pavement,complete in place the sum of: SY 26,900 $47.50 $1,277,750 $45.43 $1,222,157 $47.58 $1,279,992 20 Standard 6"concrete curb,complete in place the sum of: LF 19,300 $3.00 $57,900 $3.07 $59,187 $2.50 $48,250 21 6'Wide Concrete Sidewalk,4"min.thickness,complete in place the sum of: SF 56,350 $6.75 $380,363 $6.75 $380.363 $3.43 $193,427 _22 Adjust existing manhole frame and cover to grade,complete in place the sum of: EA 2 $750.00 $1,500 $750.00 $1,500 $750.00 $1,500 23 Block Sod,complete in place the sum of: SY 7,200 $4.10 $29,520 $4.10 $29,520 $3.68 $26,520 24 Hydromulch seeding disturbed areas wihtin R.O.W.,complete in place the sum of: AC 7 $1,800.00 $12,600 $1,800.00 $12,600 $13,578.33 $95,048 25 6-ft tall wood fence,complete in place the sum of: LF 860 $25.00 $21,500 $25.00 $21,500 $r, 3 $21,500 26 6-ft tall wood emergency access gate,30-ft wide,complete inplace the sum of: EA 1 $2,500.00 $2,500 $2,500.00 $2,500 $2.506.00 $2,500 27 4-ft tall barbed wire fence,complete in place the sum of: , LF 340 $12.00 $4,080 $12.00 $4,080 $12.00 $4,080 28 4-ft tall access gate,complete in place the sum of: EA 2 $900.00 $1,800 s„no on $1,800 $900.00 $1,800 29 8"minimum thickness concrete driveway,complete in place the sum of: SY 325 $56.00 $18,200 1148.1 H $15,657 $44.33 $14,408 30 Paving Header,complete in place the sum of: LF 90 $10.00 $900 !'; $900 $10.00 $900 31 Lane Divider Striping,complete in place the sum of: LF 12,775 $2.50 $31,938 ._ $31,938 $2.50 $31,938 32 12"Crosswalk striping,complete in place the sum of: LF 70 $6.50 $455 $455 $6.50 $455 33 24"Stop Stripe,complete in place the sum of: LF 100 $ltoo $1,100 $1,100 $i 1.00 $1,100 34 Wheelchair curb ramps,complete in place the sum of: EA 16 $300.00 $4,800 $4,800 $300.30 $4,800 35 Remove existing drainage easement gates,complete in place the sum of: EA 2 $500.00 $1,000 $1,000 $500.00 $1,000 36 Sidewalk/Inlet structure,complete in place the sum of: EA 3 $1,000.00 $3,000 $3,000 $1,000.00 $3,000 37 Retaining wall,complete inplace the sum of: LF 175 $150.00 $26,250 $26,250 $150.00 $26,250 38 4"yellow lane divider striping,complete in place the sum of: LF 3,220 $1.70 $5,474 $5,474 $1.70 $5,474 39 Raised pavement markers,complete in place the sum of: EA 165 $12.00 $1,980 $1,980 $12.00 $1,980 40 8"Solid white lane divider stripe,complete in place the sum of: LF 210 $3.50 $735 53 5u $735 $735 8 8 < 0 OS v O - S8nNSNOn08 SSN E, SOFzN ES wN 8 ^ e) b Ni n ^ z. O pN N Y H N H N m�j W b H . M ; NH . NH . 67%6 N N N NN N "' 2 2 8 8 0 2- 8 8 8 m 2 M m <`3 8 u2i a S 8. o "' - . 8 8 8 8 8 8 OO b E S 8 '8 o 00 0 0 8 0 8 o e 8 ,- t� O O t000 O f" 2 4O o vp�) O O O O c O N O vYA H N N O H p H K of o H o o VH O tp O .�t- O vn' S d7 < j N S N O_ S TO O M N OH H RI' di N3 H w W H d' vY p� a H W a a a U <n a 2 a �S H. K1 74 en u3 H a' s m h 8 N 1" N N yy S ^ P N mo N N 8 N S O O 8 O N L OO vOi 0 S W S off O N S O o N n g O S g. ^ ^ S S N H H N 0 0 � � N A O h S m b O O - N � � � T N O _ <V V N al <7 v7 �p O a W W n N N la GD N a N NH H H M d .W N N 4, 40 , N H H „ H H p N M H H t H N H . . . . N W N M K N 4 N N MN 8 N a a w 28882 888882228F888888888888888 88 88888888 m CZ; 8 8128 28 0 N K N SmaOO � nO 8b SSpO p N 8H uWWN H W3p - �HN 9 NHNY 9NMyNHNW HwHW Mw -- 4,7r `°' o8 . nrn4m $ m c Ea' cO m O ein 888c884 40cm $ 0 88 8K W K H H ni - a " n 1 O i ^ vi vi V n n i ^ N "' - p G O NH - tV q pwN H NHN H9M w NW N N N y H H N N N W W . St N NgN N HNHH NN N b H N C m J 0 ° s 8 8 8 8 8 888888888888888888888888 88 8 8 6 8 8 8 8 88 8 8 8 8 8 8 8 8 6 W �p C G n y N N C C G G G C C C N O O O 6 66 6 6 6 6 6 C G N G O C G O <A N W N S 0 8 m 2 <O,) n 2 O T mm Om O 8 8 8 p S W pp S 6p �O N O N m O H CV CV .N N N N O H ,0 . . . . . . . N H S v) O C�C S r n S O N N N S O S o N N N N N H N m N H H a a a a a N M W W N . H U . 40 m a a m O O O C')M O O N t() 0 O 0 0 0 O N 0 0 0 O N M a M M N M N'-0 N O O U) a 0 0 0 ` m O n N a 000 M n M O N a M n O W 0 U)N V M<O 00 a N cO E n M ' a n M a )<O N M '- a0 N N N M .- O C -y a C) - a o 0 W N O U LL LL LL ¢ ¢ } LL LL LL ¢LL LL LL W LL LL LL LL W LL }}O¢ ¢¢¢¢ ¢ ¢ ¢ ¢ ¢ ¢¢ ¢¢¢LL ). } } }LL L)LL U LL. 'C D J J J W W Q) J J J W J J J J J J J J J J U))J W W W W W W W W W W W W W W W J U U U U J J J J J m a) , m R EtW y ° F o H E Q N W 'O Z m m ..()' 0 5 5 .0 O Q U a U gZ .. J O o O O D C !a N Q Ei- E > > E9' ° ao `�yc m O N N o lO O m o 0 0 0 0 o .c 0 m m 0 a E y ° . E E 0 1- t E E E E E E o m L o 0 a 0 o o y y a,0 O V- O J J O J m m V 0 o w y N N N y •• " m 0 0 m � E= E E m m c m E E m m m m m m .� E o a M ro ro '0° o m c°) , y w - .. m o o .0.c z .c .c .0 o 0 o O H c n a a- m = m a) m m m 5 .. o ., E mya)ommmmmmEEEE ^ � 5S.E=a a Sca�� mma. o E m m ° u 0 U ° ° > > > > a, t .. - m m m m c c m c m m a a E E .. m t E m m m m A H m N y m m.` _ _ ro._ E ci Et ci. cm) m m 8 a a'S.a a a m m m S.a 0 0 o gI)a s°)w m a m , m c c°) ° m o o m 0 o c c c'C c c C.0.0 E E E E W a: 6 a a m an d 0 y .. 5 E E m E E° °-Al ' L m m m m m in a) cm) a)) cm).S<°13 a ° m a H o 0 0i o 3 a m a c c`ii 5 m E 2 cmi y N 0 0 m.�S 8 o-a ma w a mn a a n.0 0.,Ii.0.0 Lt d o o°-a) c°) ° c°) an d o o in E m o y a.. _ m E N a a a c c0) c°i c°) c°) c°) c°i m d d d E a) mmm -y 5 a y H Sc 'c Y E E d d'c° N ° a) car d ° ° '0° am) a a)0 o U o f E .S a m a a E ') a a a E c R E 0 ° 0 co c°) o o . E m.S m 0 o o a `-0 10 E 0 ° u c°i a 3 3 3 3 3 3 a 4 a a E c ,c c w< ` `o a y y d m or a y a m o a d 4 8 0 c H a m m 0 0 40 0 0 E E'E 0 ro m d d w = W 0 -o c.0 c c ro 0«_S .a E m m m C, “At ' " m N v) a, m ,A 0 0 0 0= 0 = C C 3 3 , - 0 ,,,L .m Ea) 0 ,_m m n.ca-E 0 0 0 0 ° _O a an d.a o.a 0 m 2 i°U)V)w w rn a 0 d o; ' m in a m a o,_ - o f E E E E E s a a a a m -- a o m.E c ° o 0 0 0 0 o t L n.as = m E E E '% -r T¢ o m o E E ` 0 c m a 0 d E a o 0 _m cm) m �a 3 3 ai N o o o o N a a.a.a z m 8 c°) 8 3 3 3 3 o m c m o o a m m a E U a 2 a o 8 oC o N 5.C - umi um) 0 8 o A A O` O)C N a ai in m m m a U'S cn U) a .. d a C U J E C C 0.- m 0. in C 0 v) 0 v) 0 0-- I I m ro 5 0 0 0 0 0 0 0 0 = m 0 0 m U O m m m G0 d a' E m 0 E E m m a 0 0 0 0 m A 5 S c 0 t t a .C .0 m .C.0 O .0 °U 0 3 3 E o a ci ° o m d a as 0 m c0i m in ; `o o E U U U U U U a`� - 0 0 m m A. 0 m m m m A m m rn c rn o[a[ 0 0 0 0 a J c U a a,x c .a m o o m E 3 3 m m.5- D ; g 2 c a c %- m in A U E U U N- E E ;a m m 0} a s m ' 0<o<a ro m<6<6 m m 3 3 m ;a o,x x x x x 5 0 5 x C c - J U c=U f0 c°) c°,;. a s co J E= O N Na y n n n n n n N O c N a N c o 0 0 0 0 0 0 0 Wi t,,,7 to i0 O O N C) • o W .6 m--Z 0 ja m U U U U V U y m m m m m m m m c c c c U U U U 3 0<a C C U o E 3 U 0 n. m in°c), i_ i_ i_1_ E E E o'o � . o o c c° O J o, m._ c c 0-0 ; H w 7 y w w w H w H 0 0 0` o N S m , 3 3 3 3 3 3 3 d 1 a, 5 5 n '' o U m U v r°U L d _o `a f/j�. m m U N N m N in H 5 m or� m m m m m m m m c c c c c m U v> 3 >.° Y d m m¢ ¢ ¢¢¢¢ mmaa d o 0fnV7(n(n(nu)tnV) . E E m ct -'m %% E o ' 3 i0 W o m m m a:a_a_a-a-a:U U m m 0 o f E E E E E E E U 0 w w w ° ° c N ac 0 m °¢.`.C .0 O o y m m a -C o 0 0 CL CE M¢ M m m U 0 o-U 0 0 0 0 0 0 0 o m m m m m. . . . WO (' W E U o . c ,m cn x 4 (1) 4 5 5 E W E E E _ - . _ . _ in _ 0 aa)U)U) in in in in in in a a a a a x x 0 1-,5 ac) a d o S-= o Na NadH Q LLLT2¢ Nn�) o°)vavai in Th=ioain i0"vininioa 5H HF4�i- coF W¢ m¢ CLUa00m z 0 N M a N<D Q n m T O N M O<O n M M O N M a O<O n M M O N M a N W n M d7 O N M O<O n. V a a a a a rc ,4 a a N to O O N O O N N O<O W O O O <O W 0 <O n N n n n n n n n n m N W DD O co... D M a0 OD 0 m McHard Road Extension(Country Place Blvd.to Cullen) Revised Cost Estimate 4-1-09 89 Box Beam Conc. (16"x 60"),complete in place the sum of: L.F. 520 $215.00 $111,800 $215.00 $111,800 $215.00 $111,800 90 Reinforced Conc.Slab 5 inch(top of bridge)CL.S,complete in place the sum of: C.Y. 144 $650.00 $93.600 $650,00 $93.600 $650.00 $93,600 91 Armor Exp.Joints,complete in place the sum of: L.F. 320 $100.00 $32,000 $100.00 $32,000 $100.00 $32,000 92 Metal beam guard rail including SGT's and terminal anchors,complete in place the sum of: L.F. 360 $55.00 $19,800 $55.00 $19,800 $55.00 $19,800 TOTAL BRIDGE ITEMS: $1,038,260.00 $943,248.00 $1,034,949.20 TRAFFIC SIGNAL AND LIGHTING ITEMS: Traffic Signal(FM 2234 @ East&West Countryplace Blvd.),per the drawings,include all 93 qauntities listed on the Summary of Traffic Signal Oaunities,complete in place the sum of: LS 1, $375,000.00 $375,000 $375.000.00 $375,000 $375,000.00 $375.000 Traffic Signal(FM 2234 @ Smith Ranch Road),per the drawings,include all gauntities listed on 94 the Summary of Traffic Signal Qaunities,complete in place the sum of: LS 1 $160,000.00 $160,000 $160,000 00 $160,000 $160,00000 $160,000 95 2"Sch 40 conduit for street lighting,complete in place the sum of: LF 12,350 $8.00 $98,800 $9.66 $119,342 $4.52 $55,781 96 Install of pull boxes provided by CenterPoint Energy,complete in place the sum of: EA 65 $10o.00 $6,500 $100.00 $6,500 $100.00 $6,500 TOTAL TRAFFIC SIGNAL AND LIGHTING ITEMS: $640,300.00 $660,842.17 $597,280.83 LANDSCAPING AND IRRIGATION ITEMS: '2"Sch.40 PVC water line for irrigation,including all fittings and appurtuences,complete in place 97 the sum of: LF 5,230 $10.00 $52,300 $10.00 $52,300 $10.00 $52,300 6"PVC,Class 200,conduit for 2"Sch.40 PVC water line for irrigation,under pavement, 98 complete in place the sum of: LF 100 $25.00 $2,500 $25.00 $2.500 $2500 $2,500 99 2"Sch 40 conduit for irrigation electrical wires,complete in place the sum of: LF 260 $8.00 $2,080 S8 00 $2,080 $8.00 $2,080 2"irrigation line connection to existing water line,all types,at Cullen,complete in place the sum 100 of: EA 1 $500.00 $500 $500.00 $500 $500.00 $500 Irrigation line connection to existing water line,inlcuding water meter,by Southwest Water 101 Company,complete in place the sum of: EA 2 $3,500.00 $7,000 $3,500.00 $7,000 $3,500.00 $7,000 102 Irrigation control valve assembly,complete in place the sum of: EA 5 $1,000.00 $5,000 $1,000.00 $5,000 $1 000,00 $5,000 103 Irrigation reduced pressure back flow preventer assembly,complete in place the sum of: EA 5 $800.00 $4,000_ $800.00 $4,000 $800 00 $4,000 Irrigation control panel,including irrigation controller,rain sensor,meter box,electrical panel, junction box,conduit,wiring,installation,mounting,foundation,all appurtuences and 104 programming to make the irrigation operational,complete in place LS 2 $2,500.00_ $5,000 $2,500.00 $5,000 $2,500.00 $5,000 105 45 Gal.Live Oak,as shown on Landscaping Plan,complete in place the sum of: EA 22 $475.00 $10,450 $475.00 $10.450 $475.00 $10,450 45 Gal.Crepe Myrtle'Basham's Party Pink',as shown on the Landscaping Plan,completein 106 place the sum of: EA 37 $360.00 $13,320 $360.00 $13,320 $292.67 $10,829 107 45 Gal.Bald Cypress,as shown on the Landscaping Plan,completein place the sum of: EA 10 $400.00 $4,000 $400.00 $4,000 $400,00 $4,000 108 30 Gal.Loblofly Pine,as shown on the Landscaping Plan,completein place the sum of: EA 27 $300.00 $8,100 $300.00 $8,100 $300.00 $8,100 109 Tree drip tubing assembly,for each tree,all types,complete in place the sum of: EA 96 $200.00 $19,200 $200.00 $19,200 $60.23 $5,782 TOTAL LANDSCAPING AND IRRIGATION ITEMS: $133,450.00 $133,450.00 $117,541.07 SUPPLEMENTAL ITEMS: Well pointing for storm sewer,all sizes,all depths,including all necessary appurtenances, 110 complete in place the sum of: L.F. 800 $20.00 $16.000 $20.00 $16.000 $20.00 $16,000 Well pointing for water lines or sanitary sewer,all sizes,aU depths,including all necessary 111 appurtenances,complete in place the sum of: L.F. 250 $20.00 $5,000 $20.00 $5,000 $20.00 $5,000 Wet condition bedding for storm sewer installation,all sizes,all depths,consisting of 12" 112 crushed stone fondation,complete in place the sum of: L.F. 800 $5.00 $4,000 $5.00 $4.000 $5.00 $4.000 Wet condition bedding for water line or sanitary sewer installation,all sizes,all depths, 113 consisting of 12"crushed stone foundation,complete in place the sum of: L.F. 250 $5.00 $1,250 $500 $1,250 $5.00 $1,250 Wet condition bedding for manhole and junction manhole construction,all sizes,all depths, 114 complete in place the sum of: EA. 6 $500.00 $3,000 $500.00 $3.000 5500.00 $3.000 115 Solid sheet shoring system for storm sewer,all sizes,all depths,complete in place the sum of: L.F. 100 $10.0o $1,00o S1o.00 $1,000 $10.00 $1,000 116 Installation and removal of piezometers,complete in place the sum of: EA. 8 $100.00 $800 $100.00 $800 $100.00 $800 117 Install extra cement stabilized sand backfill,complete in place the sum of: C.Y. 100 $20.00 $2,000 $20.00 $2,000 $20.00 $2,000 118 Install extra bank sand backfill,complete in place the sum of: C.Y. 100 $15.00 $1,500 $15,00 $1,500 $15.00 $1,500 119 Extra Type'D'asphalt pavement,complete in place the sum of: _TON 100 $75.00 $7,500 175.rr,l $7,500 $75.00 $7,500 McHard Road Extension(Country Place Blvd.to Cullen) Revised Cost Estimate 4-1.09 � $1,500 TON 50 $30.00 $1,500 $30.00. $1,500-'i1181�1 $1,005 120 Extra crushed limestone base material,complete in.lace the sum of: $�•°0° $1 00°'0° $700 III 1 $1,000.00 $1,000 $1.000.00 $700 $7.OU Brace,support and protect utility structures as per Utility Company's requirements,complete in 100 $7 00 $700 $7 00 $3 ono ®Extraaca the sum of: $3,000 $3.o$7.0n EA. 1 $a,000.00 $3,000 $a,000.00 ® .ol en.sleevee servicean valve tubin.,all box,sizes,all deaths,com.letee iu.lace the sum of: $3,o00 ®8"x6"ta.•in. and with complete in•lace,the sum of: $5,000 $100,)0 Ill 50 $100.00 $s,000 Swo.Oo ®Abandon and grout-fill existing storm sewer and culverts,all depths,all sizes,complete in place, $1so the sum of: $150 ba•� $150 $'•0n Reinforced filter fabric barrier,including repair and replacement,and maintenance,complete in ® 50 $3.00 ® $16,200 $18.00 $16.200 ®•lace the sum of: $16,200 $1a.u° Remove and replace existing wood fence,all types,as directed by the site representative, 900 $1s.00 ® $7,500 $1..00 $7,500 �com ove in.lace the sum of: $7,500 $1s.00 500 $1 s.00 ®Remove and replace existing barbed wire fence,as directed by the site representative, ® $z.so0 com•lete in.lace the sum of: $2,500 xz,5oo00 1 $2,500.00 $2,500 $2,500.00 $1,200 ri 12"water line adustment,includin.all fittin•s and a..urtences,complete in.lace the sumo: $1,200 $1 2°°90 $ao2,50o 1 $1,200.00 $1,200 $1,200.00 $8U, 00- $80,800.00- Mom g"water line adustment,includin•all fittin.s and a••urtencesTOTAL SUPPLEMENTAL ITEMS: == -�- $2,034,827.46 111111111111111111111111111111111111111111111111 $2,297,414.50� $2,082 743.32 IIIIIIIIIIIIIIIIIII TOTAL PAVING ITEMS:== = $1,612,150.00 NMI 111111111111111.1111� $1 418 016.22= $1,203,832.55 111111111111111111111 lin TOTAL DRAINAGE ITEMS:_-= IIIIIIIIIIIIIIIIIIINMI IIIIIIIIIIIIIIIIIIII $1,038,260.00 iiii $943,248.00 $1,034,949.20 NMI TOTAL BRIDGE ITEMS:= 5640,300.00 103% $660,842.17 93 io $597,280.83 NM TOTAL TRAFFIC SIGNAL AND LIGHTING ITEMS= IIIII- NMI IIIINININIIIIII 111111 $133,450.00� $133,450.00 88°0 $117,541.07 TOTAL LANDSCAPING AND IRRIGATION ITEMS:NM illi $80,800.00 100% $80,800•00 }1.10111.0111.1 00 orni $80,800.00 _ TOTAL SUPPLEMENTALITEMS: = TOTAL BASE BID ITEMS:_-- $5,802,374.50 $5,319,099.70 87% $5,069,231.11 IIIIIIIIIIIIIIIIII _ IIIIIIIo �.r�-322- — TOTAL BASE BID WITH 5/CONTINGENCY=== $6,092,493.23 $5,585,054.69 • City of Pearland Construction Cost Estimate - Final HER Job No.09-039 McHard Road Extension (Country Place to County Road 94) Item Item Description Unit Quantity Unit Price Cost Site Preperation Items 1 Mobilization,complete in place the sum of: LS 1 $50,000.00 $50,000 2 Site Preperation,complete in place the sum of: LS 1 $25,000.00 $25,000 3 Clearing and Grubbing,complete in place the sum of: AC 0.2 $5,000.00 $1,150 4 Traffic control and regulations,complete in place the sum of: LS 1 $10,000.00 $10,000 5 Flagger,complete in place the sum of: LS 1 $20,880.00 $20,880 6 Project Signs,per specification,complete in place the sum of: LS 0 $800.00 $0 Storm Water Pollution Prevention Plan:Items: Filter Fabric fence,complete in place the sum of: LF 6,077 $1.20 $7,292 Inlet Protection Barrier(For esisting and proposed Stage 1 and 2 Inlets),complete in place the sum of: EA 17 $70.00 $1,190 Stabilized construction exit,complete in place the sum of: EA 2 $2,500.00 $5,000 Paving Items: Roadway Fill,complete in place the sum of: CY 4,939 $8.50 $41,979 Remove existing pavement SY 17,581 $10.00 $175,810 8"minimum thickness hydrated lime stabilized subgrade, 20,337 _ _ __ complete in place the sum of: SY $5.15 $104,736 Hydrated lime,complete in place the sum of: _ TON 437 $140.00 $61,180 10"minimum thickness continuous reinforced concrete pavement, 17,581 complete in place the sum of: SY $47.50 $835,105 Standard 6"concrete curb,complete in place the sum_of: LF 12,104 $3.00 $36,311 Block Sod,complete in place the sum of: - SY 9,441 $4.10 $38,708 8"minimum thickness concrete driveway,complete in place the sum of: SY 116 $56.00 $6,496 Paving Header,complete in place the sum of: LF 123 $10.00 $1,230 Lane Divider Striping,complete in place the sum of: LF 6,043 $2.50 $15,108 Drainage Items Adjust existing manhole frame and cover to grade,complete in place the sum of: EA 3 $750.00 $2,250 Adjust existing manhole frame with new grate cover to grade, complete in place sum of: EA 6 $1,000.00 $6,000 Adjust existing Type"C"Inlet to grade,complete in place the sum of: EA 4 $750.00 $3,000 Adjust existing Type"C"Inlet with open back to grade,complete in place the sum of: EA 1 $750.00 Adjust existing Type"B-B"inlet to grade,complete in place the sum of: EA 3 $750.00 $2,250 Adjust existing Type"B-B"inlet with open back to grade,complete in place the sum of: EA 2 $750.00 Type"C"inlet,including foundation and backfill,complete in place the sum of: EA 1 $2,100.00 $2,100 Type"B-B"inlet,including foundation and backfill,complete in place the sum of: EA 1 $2,000.00 $2,000 ' 4'Storm Sewer Box Manhole,complete in place the sum of: EA 1 $2,650.00 $2,650 5'Storm Sewer Box Manhole w/Type"A"Inlet top,complete in place the sum of: EA 1 $3,750.00 $3,750 7-14-09 Page 1 of 2 City of Pearland Construction Cost Estimate - Final HDR Job No. 09-039 McHard Road Extension (Country Place to County Road 94) Item Item Description Unit Quantity Unit Price Cost Supplemental Items Earthwork(Drainage swales),alldepths,complete in place the 2,500 sum of: LF $4.00 $10,000 5'Storm Sewer Box Manhole w/Type"A"Inlet top,complete in place the sum of: EA 5 $3,750.00 $18,750 24"RCP,ASTM C76,Class III storm sewer,complete in place the 500 sum of: LF $70.00 $35,000 Adjust existing manhole frame and cover to grade,complete in place the sum of: EA 2 $750.00 $1,500 8"minimum thickness concrete driveway,complete in place the sum of: SY 50 $56.00 $2,800 2"Sch.40 PVC water line for irrigation,including all fittings and appurtuences,complete in place the sum of: LF 500 $10.00 $5,000 Trench safety for all storm sewers greater than 5'deep,complete in place the sum of: LF 100 $2.50 $250 Install Tree Wells,complete in place sum of: EA. 5 $1,000.00 $5,000 45 Gal.Live Oak,as shown on Landscaping Plan,complete in place the sum of: EA 2 $475.00 $950 • Install extra cement stabilized sand backfill,complete in place the sum of: C.Y. 100 $20.00 $2,000 Install extra bank sand backfill,complete in place the sum of: C.Y. 100 $15.00 $1,500 Extra Type'D'asphalt pavement,complete in place the sum of: TON 100 $75.00 $7,500 Extra crushed limestone base material,complete in place the sum of: TON 100 $30.00 $3,000 Reinforced filter fabric barrier,including repair and replacement, 100 and maintenance,complete in place the sum of: L.F. $3.00 $300 8"water line adjustment,including all fittings and appurtences, complete in place the sum of: EA. 1 $1,200.00 $1,200 Subtotal Construction Cost $1,461,175 Supplemental $94,750 Estimated Construction Cost $1,555,925 7-14-09 Page 2 of 2 I.D71 CLAUNCH & MILLER Engineering Consultants August 19,2009 Ms. Cara Davis City of Pearland Projects Department 3519 Liberty Dr. Pearland,TX 77581 Re: McHard Road Improvements and Reconstruction Project (CountyRd.94 to Cullen Blvd.) City of Pearland Bid#0109-19 HDR Job No. 08-051 Dear Ms.Davis: -On August 13, 2009, the City received five (5) bids for the above referenced project. The following is a summary of our bid evaluation: Bid Tabulation Sheet—Five(5)construction firms participated in the bidding process. Each bid was checked for mathematical errors and/or bid irregularities. The project was bid with a base bid, supplemental and extra work items. The base-bid includes the site preparation, storm water prevention,paving, drainage, bridge, traffic signal and landscaping portions of the project.The project was bid with the extension of McHard Road from Country Place Blvd: to Cullen.(Part 1) and reconstruction of McHard Road from County Road 94 to Country Place Blvd (Part 2). As discussed with City of Pearland staff, the total base bid, supplemental and extra work items were utilized as a,basis for award of the contract:The bids for the total project are as follows: Contractor Total Bid 1 BEYER CONSTRUCTION, L.P. $4,892,731.62 2 CROSS ROADS INDUSTRIES,INC. $4,967,930.70 3 : TEXAS STERLING CONSTRUCTION CO. $5,043,313.50 4 TRIPLE B SERVICES,LLP- $5,080,726.75 5 . REDDICO CONSTRUCTION COMPANY,INC. $6,366,287.95 A copy of the bid tabulation is attached. Qualifications and Experience Record --Beyer Construction L.P.provided a list of completed similar projects, list of active on-going projects, and list of projects from the last 5-years. Please see Section 2 of this report. Telephone Conversations with References - Various references were contacted by telephone and asked to respond to a series of questions. Generally, they were impressed with the work HDR Engineering,Inc. 4635 Southwest Freeway Phone(713)62269264 Suite 1000 I Fax(713)622.9265 Houston,TX 77027-7139 ; www.hdrinc.com Beyer Construction L.P. had performed and would use them again in the future. _Please see Section 3 of this report. ; Equipment & Proposed Subcontractors and-Suppliers- Beyer Construction L.P. provided a list of equipment as well as their proposed subcontractors and suppliers list. Please see Section 4 of this report. , Based-on the project information provided in the qualifications package,Beyer Construction L.P. has performed projects similar to the McHard Road Improvements and Reconstruction Project. Beyer"Construction L.P. appears to be a responsible firm that should be capable of performing the specified work in a satisfactory manner. For these reasons, we recommend that the City of Pearland award the McHard Road Improvements and Reconstruction Project (County Rd. 94 to' Cullen.Blvd)to Beyer Construction L.P. for a total of$4,892,731.62. If you have any questions,please contact me:. • Sincerely, " • HDR I'CLAUNCH&MILLER 4)e Mr K ckey,P.E. Project Engineer Cc: Mr. Gerald L.Roberts,P.E.-.Brazoria County Engineering Department Mr.Al Lentz,P.E.-Brazoria Drainage District No.4 Mr-Jaime Salinas,P.E. -Brazoria County M.U.D.#4 ,