R2009-138 - 2009-08-31RESOLUTION NO. R2009-138
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES
ASSOCIATEDWITH THE MCHARD ROAD EXPANSION PROJECT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That the City opened bids for construction services associated with the
McHard Road Expansion Project, and such bids have been reviewed and tabulated.
Section 2. That the City Council hereby awards the bid to Beyer Construction, in
the amount of $4,892,731.62.
Section 3. The City Manager or his designee is hereby authorized to execute a
contract for construction services associated with the McHard Expansion Project.
PASSED, APPROVED and ADOPTED this the 31St day of August, A.D., 2009.
TOM REID
MAYOR
ATTEST:
YO GL ,T
CI SEC TARY
APPROVED AS TO FORM:
~~.,: h. ~
DARRIN M. COKER
CITY ATTORNEY
I.
City of Pearland,Texas
McHard Road Improvements and Reconstruction Project(County Rd.94 to Cullen Blvd) i•
LOW BIDDER
BEYER CONSTRUCTION, CROSS ROADS INDUSTRIES, TEXAS STERLING REDDICO CONSTRUCTION
L.P. INC. CONSTRUCTION CO. TRIPLE B SERVICES,LLP COMPANY,INC.
ITEM ITEM DESCRIPTION UNIT QUAN. UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
NO. PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
SITE PREPARATION ITEMS(ALL PROJECT LOCATIONS):
1 Mobilization,complete in place the sum of:(3%MAXIMUM) LS 1 $107,531.72 $107,531.72 $149,000.00 $149,000.00 $140,000.00 $140,000.00 $40,000.00 $40,000.00 $189,000.00 $189,000.00
2 Site Preparation,complete in place the sum of: LS 1 $87,600.00 $87,600.00 $176,000.00 $176,000.00 $137,000.00 $137,000.00 $45,000.00 $45,000.00 $15,000.00 $15,000.00
3 Clearing and Grubbing,complete in place the sum of: AC 5.30 $5,315.00 $28,169.50 $10,000.00 $53,000.00 $4,000.00 $21,200.00 $2.600.00 $13,780.00 $7,000.00 $37,100.00
4 Removal and disposal of existing fences.all types.as indicated on the drawings,complete in place the sum of: LF 550 $2.60 $1,430.00 $4.00 $2,200.00 $5.00 $2,750.00 $2.30 $1,265.00 $5.00 $2,750.00
5 Removal and dispose of existing concrete slab,STA 58+00,100'RT,complete In place the sum of: EA 1 $1,950.00 $1,950.00 $600.00 $600.00 $1,000.00 $1,000.00 $910.00 $910.00 $950.00 $950.00
6 Remove and dispose of existing septic tank and system,STA 58+25, 105'RT.complete in place the sum of: EA 1 $1,103.00 $1,103.00 $400.00 $400.00 $3,500.00 $3,500.00 $2,375.00 $2,375.00 $1,700.00 $1,700.00
7 Traffic control and regulations(Country Place to Cullen),complete in place the sum of: LS 1 $14,900.00 $14,900.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $24,000.00 $24,000.00 $9,100.00 $9,100.00
8 Traffic control and regulations(County Road 94 to Country Place),complete in place the sum of: LS 1 $1,510.00 $1,510.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $24,000.00 $24,000.00 $9,100.00 $9,100.00
9 Flapper,complete in place the sum of: LS 1 $5,400.00 $5,400.00 $2,000.00 $2,000.00 $10,000.00 $10,000.00 $11,000.00 $11,000.00 $16,000.00 $16,000.00
TOTAL SITE PREPARATION ITEMS(ALL PROJECT LOCATIONS): $249,594.22 $423,200.00 $355,450.00 $162,330.00
$280,700.00
STORM WATER POLLUTION PREVENTION ITEMS(COUNTRY PLACE TO CULLEN):
10 Filter Fabric fence,complete in place the sum of: LF 12,600 $0.85 $10,710.00 $1.00 $12,600.00 $1.00 $12,600.00 $1.15 $14,490.00 $1.05 $13,230.00
11 Reinforced Filter Fabric fence,complete in place the sum of: LF 450 $1.05 $472.50 $2.00 $900.00 $1.25 $562.50 $1.25 $562.50 $1.50 . $675.00
12 Rock Filter Dam.complete in place the sum of: EA 2 $170.00 $340.00 $1,200.00 $2,400.00 $1,000.00 $2,000.00 $800.00 $1,600.00 $1,300.00 $2,600.00
13 Inlet Protection Barrier(For existing and proposed Stage 1 and 2 Inlets),complete in place the sum of: EA 39 $135.00 $5,265.00 $20.00 $780.00 $35.00 $1,365.00 $40.00 $1,560.00 $39.00 $1,521.00
14 Stabilized construction exit,complete in place the sum of: EA 2 $625.00 $1,250.00 $1,200.00 $2,400.00 $500.00 $1,000.00 $500.00 $1,000.00 $1,400.00 $2,800.00
_ TOTAL STORM WATER POLLUTION PREVENTION ITEMS(COUNTRY PLACE TO CULLEN): $18,037.50 $19,080.00 $17,527.50 $19,212.50 $20,826.00
PAVING ITEMS(COUNTRY PLACE TO CULLEN):
15 Roadway Fill,complete in place the sum of: CY 11,100 $14.26 $158,286.00 $1.00 $11,100.00 $5.00 $55,500.00 $7.50 $83,250.00 $9.00 $99,900.00
16 Construction Excavation,complete in place the sum of: CY 2,960 $5.00 $14,800.00 $2.00 $5,920.00 $4.00 $11,840.00 $3.00 $8,880.00 $3.00 $8,880.00
17 8'minimum thickness hydrated lime stabilized subgrade.complete In place the sum of: SY 29,020 $1.50 $43,530.00 $1.00 $29,020.00 $2.00 $58,040.00 $1.55 $44,981.00 $1.90 $55,138.00
18 Hydrated lime,complete in place the sum of: TON 670 $125.00 $83,750.00 $130.00 $87,100.00 $130.00 $87,100.00 $130.00 $87,100.00 $150.00 $100,500.00
19 10"minimum thickness reinforced concrete pavement,complete in place the sum of: SY 26,900 $34.35 $924,015.00 $34.00 $914,600.00 $35.00 $941,500.00 $34.50 $928,050.00 $39.80 $1,070,620.00
20 Standard 6°concrete curb,com lete in lace the sum of: LF 19,300 1.65 $31,845.00 $1.00 $19,300.00 $1.00 $19 300.00 $2.50 $48,250.00 $2.25 $43,425.00
21 6'Wide Concrete Sidewalk,4"min.thickness,complete In place the sum of: SF 56,350 $3.50 $197,225.00 $4.00 $225,400.00 $3.00 $169,050.00 $3.40 $191,590.00 $14.00 $788,900.00
22 Adjust existing manhole frame and cover to grade,complete in place the sum of: EA 2 $202.00 $404.00 $100.00 $200.00 $2,000.00 $4,000.00 $170.00 $340.00 $560.00 $1,120.00
23 Block Sod,complete in place the sum of: SY 7200 $2.56 $18,432.00 $2.50 $18,000.00 $3.00 $21,600.00 $4.00 $28,800.00 $3.00 $21,600.00
24 Hydromulch seeding disturbed areas wihtin R.O.W.,complete in place the sum of: AC 7 $1,125.00 $7,875.00 $1,100.00 $7,700.00 $1,200.00 $8,400.00 $1,500.00 $10,500.00 $1,300.00 $9,100.00
25 6-ft tall wood fence,complete in place the sum of: LF 860 $19.50 $16,770.00 $17.00 $14,620.00 $18.00 $15,480.00 $20.00 $17,200.00 $16.80 $14,448.00
26 6-ft tall wood emergency access gate,30-ft wide,complete in place the sum of: EA 1 $1,750.00 $1,750.00 $2,800.00 $2,800.00 $2,000.00 $2,000.00 $5,600.00 $5,600.00 $2,000.00 $2,000.00
27 4-ft tall barbed wire fence,complete in place the sum of: LF 340 $7.75 $2,635.00 $5.00 $1,700.00 $4.00 $1,360.00 $3.50 $1,190.00 $5.60 $1,904.00
28 4-ft tall access gate,complete in place the sum of: EA 2 $480.00 $960.00 $400.00 $800.00 $250.00 $500.00 $1,500.00 $3,000.00 $560.00 $1,120.00
29 8"minimum thickness concrete driveway,complete in place the sum of: SY 325 $46.80 $15210.00 $40.00 $13,000.00 $56.00 $18,200.00 $40.00 $13,000.00 $40.00 $13,000.00
30 Paving Header,complete in place the sum of: LF 90 $7.10 $639.00 $13.00 $1,170.00 $5.00 $450.00 $25.00 $2,250.00 $10.25 $922.50
31 Lane Divider Striping,complete in place the sum of: LF 12,775 $0.37 $4,726.75 $0.37 $4,726.75 $0.30 $3,832.50 $0.40 $5,110.00 $0.40 $5,110.00
32 12"Crosswalk striping.complete in place the sum of: LF 70 $3.25 $227.50 $3.20 $224.00 $3.00 $210.00 $3.60 $252.00 $3.50 $245.00
33 24"Stop Stripe,complete in place the sum of: LF 100 $6.10 $610.00 $6.00 $600.00 $6.00 $600.00 $6.50 $650.00 $6.70 $670.00
34 Wheelchair curb ramps,complete in place the sum of: EA 16 $470.00 $7,520.00 $500.00 $8,000.00 $1,300.00 $20,800.00 $1,400.00 $22,400.00 $950.00 $15,200.00
35 Remove existing drainage easement gates,complete in place the sum of: EA 2 $275.00 $550.00 $30.00 $60.00 $400.00 $800.00 $330.00 $660.00 $550.00 $1,100.00
36 Sidewalkllnlet structure.complete In place the sum of: EA 3 $3,550.00 $10,650.00 $1,200.00 $3,600.00 $7,000.00 $21,000.00 $2,000.00 $6,000.00 $5,300.00 $15,900.00
37 Retaining wall,complete in place the sum of: LF 175 $130.00 $22,750.00 $400.00 $70,000.00 $90.00 $15,750.00 $185.00 $32,375.00 $240.00 $42,000.00
38 4"yellow lane divider striping,complete in place the sum of: LF 3,220 $0.38 $1223.60 $0.37 $1,191.40 $1.00 $3,220.00 $0.45 $1,449.00 $0.40 $1,288.00
39 Raised pavement markers,complete In place the sum of: EA 165 $4.75 $783.75 $4.70 $775.50 $5.00 $825.00 $5.30 $874.50 $5.25 $866.25
40 8°Solid white lane divider stripe,complete in place the sum of: LF 210 $0.86 $180.60 $0.85 $178.50 $1.00 $210.00 $1.00 $210.00 $0.95 $199.50
41 24-Solid white stop stripe,complete In place the sum of: LF 50 $6.10 $305.00 $6.00 $300.00 $6.00 $300.00 $6.75 $337.50 $6.70 $335.00
Bid No.0109-19
NUB 08-051
1 of 5
City of Pearland,Texas
McHard Road Improvements and Reconstruction Project(County Rd.94 to Cullen Blvd) '°
BEYER CONSTRUCTION, CROSS ROADS INDUSTRIES, TEXAS STERLING REDDICO CONSTRUCTION
L.P. INC. CONSTRUCTION CO. TRIPLE B SERVICES,LLP COMPANY,INC.
ITEM ITEM DESCRIPTION UNIT QUAN. UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL -
NO. PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
,
42 4"Solid yellow median striping,complete In place the sum of: LF 70 $0.38 $26.60 $0.37 $25.90 $1.00 $70.00 $0.45 $31.50 $0.40 $28.00
43 24'solid yellow diagonals,complete in place the sum of: LF 20 $5.95 $119.00 $5.90 $118.00 $6.00 $120.00 $6.65 $133.00 $6.60 $132.00
44 Painted word"ONLY",complete in place the sum of: EA 3 $255.00 $765.00 $250.00 $750.00 $200.00 $600.00 $280.00 $840.00 $280.00 $840.00
45 Painted Arrow,complete in place the sum of: EA 3 $163.00 $489.00 $160.00 $480.00 $200.00 $600.00 $180.00 $540.00 $175.00 $525.00
46 Temporary asphalt pavement transition to Cullen,complete In place the sum of: _ SY 740 $49.00 $36,260.00 $5.00 $3,700.00 $20.00 $14,800.00 $38.00 $28,120.00 $43.00 $31,820.00
TOTAL PAVING ITEMS(COUNTRY PLACE TO CULLEN): $1,605,312.80 $1,447,160.05 $1,498,057.50 $1,573,963.50 $2,348,836.25
DRAINAGE ITEMS(COUNTRY PLACE TO CULLEN):
47 Earthwork(Drainage swales),all depths,complete in place the sum of: LF 6,300 $1.30 $8,190.00 $2.00 $12,600.00 $1.00 $6,300.00 $2.00 $12,600.00 $3.00 $18,900.00
48 Remove existing 24"storm sewer pipe,complete in place the sum of: LF 105 $10.15 $1,065.75 $6.00 $630.00 $7.00 $735.00 $13.00 $1,365.00 $12.00 $1,260.00
49 Remove existing 42"storm sewer pipe,complete in place the sum of: LF 65 $17.25 $1,121.25 $8.00 $520.00 $7.00 $455.00 $15.00 $975.00 $21.80 $1,417.00
50 Remove existing storm manhole,complete in place the sum of: EA 1 $215.00 $215.00 $200.00 $200.00 $300.00 $300.00 $260.00 $260.00 $260.00 $260.00
51 24"RCP,ASTM C76,Class III storm sewer,complete In place the sum of: LF 2,430 $30.85 $74,965.50 $38.00 $92,340.00 $38.00 $92,340.00 $48.50 $117,855.00 $41.75_ $101,452.50
52 30"RCP,ASTM C76,Class III storm sewer.complete inplace the sum of: LF 1,775 $39.40 $69,935.00 $55.00 $97,625.00 $70.00 $124,250.00 $60.00 $106,500.00 $61.00 $108.275.00
53 36"RCP,ASTM C76.Class III storm sewer,complete in place the sum of: LF 330 $58.00 $19.140.00 $65.00 $21,450.00 $100.00 $33,000.00 $80.00 $26,400.00 $86.20 $28,446.00
54 42"RCP,ASTM C76,Class III storm sewer,complete in place the sum of: LF 450 $73.00 $32,850.00 $78.00 $35,100.00 $85.00 $38,250.00 $97.00 $43,650.00 $95.50 $42,975.00
55 48"RCP,ASTM C76,Class III storm sewer,complete in place the sum of: IF 610 $86.00 $52,460.00 $86.00 $52,460.00 $86.00 $52,460.00 $115.00 $70,150.00 $106.20 $64,782.00
56 54"RCP,ASTM C76,Class III storm sewer,complete in place the sum of: LF 620 $101.00 $62,620.00 $100.00 $62,000.00 $100.00 $62,000.00 $132.00 $81,840.00 $120.40 $74,648.00
57 5'x5' RCB Storm Sewer,all depths,complete In place the sum of: LF 1,245 $158.00 $196,710.00 $177.00 $220,365.00 $165.00 $205,425.00 $205.00 $255,225.00 $173.60 $216,132.00
58 6'X5'RCB Storm Sewer,all depths,complete in place the sum of: LF 330 $190.00 $62,700.00 $217.00 $71,610.00 $210.00 $69,300.00 $240.00 $79,200.00 $209.10 $69,003.00
59 36"CGSP storm sewer outfall pipe,complete in place the sum of: LF 70 $76.00 $5,320.00 $70.00 $4,900.00 $80.00 $5,600.00 $88.00 $6,160.00 $70.20 $4,914.00
60 42'CGSP storm sewer outfall pipe,complete in place the sum of: LF 80 $86.25 $6,900.00 $75.00 $6,000.00 $85.00 $6,800.00 $98.00 $7,840.00 $77.20 $6,176.00
61 5"Concrete slope paving.around outfall,complete in place the sum of: SY 180 $76.66 $13,798.80 $35.00 $6,300.00 $46.00 $8,280.00 $38.00 $6.840.00 $40.25 $7,245.00
62 Interlocking blocks at drainage ditch,complete in place the sum of: SY 1,815 $32.40 $58,806.00 $40.00 $72,600.00 $5.00 $9,075.00 $43.00 $78,045.00 $35.20 $63,888.00
63 6'x5'Concrete Wingwall/Drainage Outfall Structure,complete in place the sum of: LS 1 $11,365.00 $11,365.00 $9,500.00 $9,500.00 $20,000.00 $20,000.00 $9,320.00 $9,320.00 $9,100.00 $9,100.00
64 4'Storm Sewer Box Manhole,complete in place the sum of: EA 3 $1,780.00 $5,340.00 $1,800.00 $5,400.00 $2,500.00 $7,500.00 $3,365.00 $10,095.00 $2,000.00 $6,000.00
65 5'Storm Sewer Box Manhole,complete in place the sum of: EA 4 $2,700.00 $10,800.00 $2,900.00 $11,600.00 $3,000.00 $12,000.00 $4,280.00 $17,120.00 $3.140.00 $12,560.00
66 6'Storm Sewer Box Manhole.complete in place the sum of: EA 1 $2,670.00_ $2,670.00 $2,600.00 $2,600.00 $4,000.00 $4,000.00 $4,320.00 $4,320.00 $3,000.00 $3,000.00
67 4'Storm Sewer Box Manhole w/Type"E"Inlet top,complete in place the sum of: EA 1 $2,370.00 $2.370.00 $2,600.00 $2,600.00_ $4,500.00 $4,500.00 $3,850.00 $3,850.00 $3.000.00 $3,000.00
68 5'Storm Sewer Box Manhole w/Type"E"Inlet top,complete in place the sum of: EA 1 $2,365.00 $2,365.00 $2,500.00 $2,500.00 $4,600.00 $4,600.00 $3,800.00 $3,800.00 $3,200.00 $3,200.00
69 5'Storm Sewer Box Manhole w/Type"A"Inlet top,complete In place the sum of: EA 1 $2,325.00 $2,325.00 $2,500.00 $2,500.00 $3,200.00 $3,200.00 $3,650.00 $3,650.00 $3.000.00 $3,000.00
70 6'Storm Sewer Box Manhole w/Type"E"inlet top,complete In place the sum of: EA 1 $2,745.00 $2,745.00 $2,700.00 $2,700.00 $5,600.00 $5,600.00 $4,500.00 $4,500.00 $3,300.00 $3,300.00
71 4'Storm Sewer Box Manhole on RCB storm sewer,w/"E'Inlet top,complete In place the sum of: EA 1 $2,370.00 $2,370.00 $2,200.00 $2,200.00 $3,500.00 $3,500.00 $3,850.00 $3,850.00 $2,800.00 $2,800.00
72 Type"C"Inlet,Including foundation and backfill,complete in place the sum of: EA 13 $2,520.00 $32,760.00 $2,500.00 $32,500.00 $2,600.00 $33,800.00 $3,450.00 $44,850.00 $2,700.00 $35,100.00
73 Type"C"inlet,with open back,including foundation and backfill,complete in place the sum of: EA 1 $3,530.00 $3,530.00 $3,200.00 $3,200.00 $4,600.00 $4,600.00 $4,475.00 $4,475.00 $4,200.00 $4,200.00
74 Type"E"Inlet,Including foundation and backfill,complete in place the sum of: EA 3 $1,780.00 $5,340.00 $1,800.00 $5,400.00 $3,500.00 $10,500.00 $2,680.00 $8,040.00 $2,100.00 $6,300.00
75 Type"E"Inlet on 6'x5'RCB Storm Sewer,complete In place the sum of: EA 2 $1,830.00 $3,660.00 $2,000.00 $4,000.00 $3,500.00 $7,000.00 $2,900.00 $5,800.00 $2,300.00 $4,600.00
76 Type'E"inlet on 5'x5'RCB Storm Sewer,complete in place the sum of: EA 3 $1,615.00 $4,845.00 $1,800.00 $5,400.00 $3,300.00 $9,900.00 $2,625.00 $7,875.00 $2,100.00 $6,300.00
77 7'x4'Storm Junction Box w/Type"E"Inlet top,complete in place the sum of: EA 2 $5,725.00 $11,450.00 $6,200.00 $12,400.00 $9,000.00 $18,000.00 $6,800.00 $13,600.00 $6,600.00 $13.200.00
78 8'x4'Storm Junction Box w/Type"E"Inlet top,complete in place the sum of: EA 1 $6,425.00 $6,425.00 $7,000.00 $7,000.00 $11,000.00 $11,000.00 $7,500.00 $7.500.00 $7,500.00 $7,500.00
79 Trench safety for all storm sewers greater than 5'deep,complete in place the sum of: LF 8 500 $0.31 $2,635.00 $1.00 $8,500.00 $0.10 $850.00 $0.25 $2,125.00 $0.25 $2,125.00
__ TOTAL DRAINAGE ITEMS(COUNTRY PLACE T_O CULLEN): $779,792.30 $876,700.00 $875,120.00 $1,049,675.00 $935,058.50
BRIDGE ITEMS(COUNTRY PLACE TO CULLEN):
80 Abutment Conc.CL C,complete in place the sum of: C.Y. 52 $1,825.00 $94,900.00 $800.00 $41,600.00 $1,250.00 $65,000.00 $508.00 $26,416.00 $835.00 $43,420.00
81 Bent Conc.CL C,complete In place the sum of: C.Y. 50 $1,930.00 $96,500.00 $700.00 $35,000.00 $1,000.00 $50,000.00 $608.00 $30,400.00 $920.00 $46,000.00
82 Approach Slab Conc.CL S,complete in place the sum of: C.Y. 140 $203.00 $28,420.00 $375.00 $52,500.00 $350.00 $49,000.00 $367.00 $51,380.00 $640.00 $89,600.00
83 Ret.Wall(wingwalt)Conc.CL C,complete In place the sum of: C.Y. 31 $965.00 $29,915.00 $525.00_ $16,275.00 $725.00 $22,475.00 $450.00 $13,950.00 $670.00 $20,770.00
84 Conc.Rail Conc.C-203,complete in place the sum of: L.F. 568 $86.25 $48,990.00 $65.00 $36,920.00 $90.00 $51,120.00 $58.00 $32,944.00 $90.00 $51,120.00
85 Pedestrian Metal Rail Conc.PR-1,complete in place the sum of: L.F. 284 $76.10 $21,612.40 $80.00 , $22,720.00 $80.00 $22,720.00 $65.00 $18,460.00 $140.00 $39,760.00
86 Drill Shaft(24-in),complete in place the sum of: L.F. 1,340 $60.30 $80,802.00 $80.00 $107,200.00 $92.00 $123,280.00 $89.00 $119,260.00 $156.00 $209,040.00
87 Drill Shaft(18-in),complete in place the sum of: L.F. 120 $35.20 $4,224.00 $45.00 $5,400.00 $110.00 $13,200.00 $49.00 $5,880.00 $134.00 $16,080.00
Bid No.0109-/9
HDR 08-051 2 of 5
City of Pearland,Texas
McHard Road Improvements and Reconstruction Project(County Rd.94 to Cullen Blvd)
BEYER CONSTRUCTION, CROSS ROADS INDUSTRIES, TEXAS STERLING REDDICO CONSTRUCTION
L.P. INC. CONSTRUCTION CO. TRIPLE B SERVICES,LLP COMPANY,INC.
ITEM ITEM DESCRIPTION UNIT QUAN. UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
NO. PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
88 Box Beam Conc.(16"x 48"),complete In place the sum of: L.F. 1,560 $122.00 $190,320.00 $140.00 $218,400.00 $132.00 $205,920.00 $147.00 $229,320.00 $168.00 $262,080.00
89 Box Beam Conc. (16"x 60"),complete in place the sum of: L.F. 520 $122.00 $63,440.00 $140.00 $72,800.00 $150.00 $78,000.00 $149.00 $77,480.00 $168.00 $87.360.00
90 Reinforced Conc.Slab 5 Inch(lop of bridge)CL.S,complete In place the sum of: C.Y. 144 $406.00 $58,464.00 $645.00 $92,880.00 $700.00 $100,800.00 $380.00 $54,720.00 $670.00 $96,480.00
91 Armor Exp.Joints,complete in place the sum of: L.F. 320 $45.65 $14,608.00 $55.00 $17,600.00 $80.00 $25,600.00 $45.00 $14,400.00 $123.00 $39,360.00
92 Metal beam guard rail Including SGTs and terminal anchors,complete in place the sum of: L.F. 360 $28.40 $10,224.00 $30.00 $10,800.00 $55.00 $19,800.00 $55.00 $19,800.00 $33.50 $12,060.00
TOTAL BRIDGE ITEMS(COUNTRY PLACE TO CULLEN): $742,419.40 $730,095.00 $826,915.00 $694,410.00 $1,013,130.00
TRAFFIC SIGNAL AND LIGHTING ITEMS(COUNTRY PLACE AND CR 94):
Traffic Signal(FM 2234 @ East&West Countryplace Blvd.),per the drawings,include all qauntities listed on
93 the Summary of Traffic Signal Oaunities,complete In place the sum of: LS 1 $258,000.00 $258,000.00 $265,000.00 $265,000.00 $267,000.00 $267,000.00 $265,000.00 $265,000.00 $280,000.00 $280,000.00
Traffic Signal(FM 2234 @ Smith Ranch Road),per the drawings,include all qauntities listed on the Summary
94 of Traffic Signal Oaunities,complete In place the sum of: LS 1 $148,360.00 $148,360.00 $155,000.00 $155,000.00 $15,000.00 415,000.00 $170,000.00 $170,000.00 $152,000.00 $152,000.00
95 2°Sch 40 conduit for street lighting,complete in place the sum of: LF 12,350 $3.55 $43,842.50 $3.50 $43,225.00 $4.00 $49,400.00 $4.00 $49,400.00 $7.75 $95,712.50
96 Install of pull boxes provided by CenterPoint Energy,complete In place the sum of: EA 65 $215.00 $13,975.00 $210.00 $13,650.00 $220.00 $14,300.00 $220.00 $14,300.00 $217.00 $14,105.00
TOTAL TRAFFIC SIGNAL AND LIGHTING ITEMS(COUNTRY PLACE AND CR 94): $464,177.50 $476,875.00 $345,700.00 $498,700.00 $541,817.50
LANDSCAPING AND IRRIGATION ITEMS(COUNTRY PLACE TO CULLEN):
97 2"Sch.40 PVC water line for irrigation,including all fittings and appurtuences,complete in place the sum of: LF 5,230 $3.05 $15.951.50 $1.42_ $7,426.60 $3.00 $15,690.00 $3.50 $18,305.00 $2.50 $13,075.00
6"PVC,Class 200,conduit for 2"Sch.40 PVC water line for irrigation,under pavement,complete in place the
98 sum of: LF 100 $32.50 $3,250.00 $18.00 $1,800.00 $36.00 $3,600.00 $15.00 $1,500.00 $28.00 $2,800.00
99 2"Sch 40 conduit for irrigation electrical wires,complete in place the sum of: LF 260 $3.55 $923.00 $12.00 $3,120.00 $4.00 $1,040.00 $4.00 $1,040.00 $11.00 $2,860.00
100 2"irrigation line connection to existing water line,all types,at Cullen,complete in place the sum of: EA 1 $305.00 $305.00 $2,900.00 $2,900.00 $1,600.00 $1,600.00 $340.00 $340.00 $3,350.00 $3,350.00
Irrigation line connection to existing water line,inlcuding water meter,by Southwest Water Company,complete
101 in place the sum of: EA 2 $4,060.00 $8,120.00 $600.00 $1,200.00 $1,600.00 $3,200.00 $4,500.00 $9,000.00 $3,350.00 $6,700.00
102 Irrigation control valve assembly,complete in place the sum of: EA 5 $406.00 $2,030.00 $410.00 $2,050.00 $800.00 $4,000.00 $450.00 $2,250.00 $635.00 $3,175.00
103 Irrigation reduced pressure back flow preventer assembly,complete in place the sum of: EA 5 $1.015.00 $5,075.00 $630.00 $3,150.00 $500.00 $2,500.00 $1,200.00 $6,000.00 $780.00 $3,900.00
Irrigation control panel,including irrigation controller,rain sensor,meter box,electrical penal,junction box,
conduit,wiring,installation,mounting,foundation,all appurtuences and programming to make the irrigation
104 operational,complete in place LS 2 $3,350.00 $6,700.00 $4,500.00 $9,000.00 $1,400.00 $2,800.00 $3,700.00 $7,400.00 $8,900.00 $17,800.00
105 45 Gal.Live Oak,as shown on Landscaping Plan,complete in place the sum of: EA 22 $365.00 $8,030.00 $216.00 . $4,752.00 $450.00 $9,900.00 $405.00 $8,910.00 $360.00 $7,920.00
106 45 Gal.Crepe Myrtle'Basham's Party Pink',as shown an the Landscaping Plan,completein place the sum of: EA 37 $365.00 $13,505.00 $290.00 $10,730.00 $500.00 $18,500.00 $405.00 $14,985.00 $360.00 $13,320.00
107 45 Gal.Bald Cypress,as shown on the Landscaping Plan,completein place the sum of: EA 10 $365.00 $3,650.00 $216.00 $2,160.00 $500.00 $5,000.00 $405.00 $4,050.00 $380.00 $3,800.00
108 30 Gal.Loblolly Pine,as shown on the Landscaping Plan.completein place the sum of: EA 27 $244.00 $6,588.00 $180.00 $4,860.00 $300.00 $8,100.00 $270.00 $7,290.00 $206.00 $5,562.00
109 Tree drip tubing assembly,for each tree,all types,complete in place the sum of: EA 96 $35.50 $3,408.00 $21.50 $2,064.00 $25.00 $2,400.00 $40.00 $3,840.00 $115.00 $11 04, 0.00
TOTAL LANDSCAPING AND IRRIGATION ITEMS(COUNTRY PLACE TO CULLEN): $77,535.50 $55,212.60 $78,330.00 $84,910.00 $95,302.00
STORM WATER POLLUTION PREVENTION ITEMS(CR 94 TO COUNTRY PLACE): $0.00
110 Filter Fabric fence,complete in place the sum of: LF 6,200 $0.82 $5,084.00 $1.00 $6,200.00 $0.50 $3,100.00 $1.15 $7,130.00 $1.05 $6,510.00
111 Inlet Protection Barrier(For existing and proposed Stage 1 and 2 Inlets),complete in place the sum of: EA 17 $169.00 $2,873.00 $20.00 $340.00 $40.00 $680.00 $40.00 $680.00 $39.15 $665.55
112 Stabilized construction exit,complete In place the sum of: EA 2 $620.00 $1,240.00 $1,200.00 $2,400.00 $1,000.00 $2,000.00 $500.00 $1,000.00 $1,340.00 $2,680.00
TOTAL STORM WATER POLLUTION PREVENTION ITEMS(CR 94 TO COUNTRY PLACE): $9,197.00 $8,940.00 $5,780.00 $8,810.00 $9,855.55
PAVING ITEMS(CR 94 TO COUNTRY PLACE):
113 Roadway Fill,complete In place the sum of: CY 3,040 $12.75 $38,760.00 $7.00 $21,280.00 $19.00 $57,760.00 $7.50 $22,800.00 $9.25 $28,120.00
114 Remove existing pavement SY 17,935 $0.71 $12,733.85 $1.00 $17,935.00 $1.00 $17,935.00 $1.00 $17,935.00 $2.25 $40,353.75
115 8°minimum thickness hydrated lime stabilized subgrade,complete In place the sum of: SY 20,745 $1.40 $29,043.00 $1.00 $20,745.00 $1.50 $31,117.50 $1.55 $32,154.75 $1.90 $39,415.50
116 Hydrated lime,complete in place the sum of: TON 445 $125.00 $55,625.00 $130.00 $57,850.00 $125.00 $55,625.00 $130.00 $57,850.00 $154.00 $68,530.00
117 10"minimum thickness continuous reinforced concrete pavement,complete in place the sum of: SY 17,935 $34.50 $618,757.50 $34.00 $609,790.00 $38.00 $681,530.00 $34.50 $618,757.50 $39.40 $706,639.00
118 Standard 6"concrete curb,complete in place the sum of: LF 12,345 $1.69 $20,863.05 $1.00 $12,345.00 $1.00 $12,345.00 $2.50 $30,862.50 $2.25 $27,776.25
119 Block Sod,complete in place the sum of: SY 9,630 $2.56 $24,652.80 $2.50 $24,075.00 $3.00 $28,890.00 $4.00 $38,520.00 $3.08 $29,660.40
120 8"minimum thickness concrete driveway.complete in place the sum of: SY _ 120 $46.80 $5,616.00 $40.00 $4,800.00 $85.00 $10,200.00 $38.00 $4,560.00 $40.00 $4,800.00
121 Paving Header,complete in place the sum of: LF 125 $7.10 $887.50 $13.00 $1,625.00 $5.00 $625.00 $26.00 $3.250.00 $10.25 $1,281.25
122 Lane Divider Striping,complete in place the sum of: LF 6,165 $0.38 $2,342.70 $0.37 $2.281.05 $0.40 $2,466.00 $0.40 $2,466.00 $0.40 $2,466.00
TOTAL PAVING ITEMS(CR 94 TO COUNTRY PLACE): $809,281.40 $772,726.05 $898,493.50 $829,155.75 $949,042.15
DRAINAGE ITEMS(CR 94 TO COUNTRY PLACE):
Did No.01119-19
HDD 08-051
3 of 5
City of Pearland,Texas
McHard Road Improvements and Reconstruction Project(County Rd.94 to Cullen Blvd) "
BEYER CONSTRUCTION, CROSS ROADS INDUSTRIES, TEXAS STERLING REDDICO CONSTRUCTION
L.P. INC. CONSTRUCTION CO. TRIPLE B SERVICES,LLP COMPANY,INC.
ITEM ITEM DESCRIPTION UNIT (MAN. UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL _
NO. PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT _
123 Adjust existing manhole frame and cover to grade,complete in place the sum of: EA 3 $203.00 $609.00 $120.00 $360.00 $500.00 $1,500.00 $350.00 $1,050.00 $500.00 $1,500.00
124 Adjust existing manhole frame with new grate cover to grade,complete in place sum of: _ EA 6 $595.00 $3,570.00 $500.00 $3,000.00 $500.00 $3,000.00 $350.00 $2,100.00 $700.00 $4,200.00
125 Adjust existing Type"C'Inlet to grade,complete in place the sum of: EA 4 $355.00 $1,420.00 $1,500.00 $6,000.00 $500.00 $2,000.00 $350.00 $1,400.00 $1,200.00 $4,800.00
126 Adjust existing Type"C"Inlet with open back to grade,complete in place the sum of: EA 1 $355.00 $355.00 $1,500.00 $1,500.00 $500.00 $500.00 $350.00 $350.00 $1,400.00 $1,400.00
127 Adjust existing Type"B-B"inlet to grade,complete In place the sum of: EA 3 $355.00 $1,065.00 $1,500.00 $4,500.00 $500.00 $1,500.00_ $350.00 $1,050.00 $1,500.00 $4,500.00
128 Adjust existing Type"B-B"inlet with open back to grade,complete in place the sum of: EA 2 $355.00 $710.00 $1,500.00 $3,000.00 $500.00 $1,000.00 $350.00 $700.00 $1,700.00 $3,400.00
129 Type"C"inlet,including foundation and backfill,complete in place the sum of: EA 1 $2,190.00 $2,190.00 $1,800.00 $1,800.00 $2,000.00 $2,000.00 $3,100.00 $3,100.00 $2,700.00 $2,700.00
130 Type"B-B"inlet,including foundation and backfill,complete in place the sum of: EA 1 $2,260.00 $2,260.00 $1,900.00 $1,900.00 $2,000.00 $2,000.00 $2,800.00 $2,800.00 $2,900.00 $2,900.00
131 4'Storm Sewer Box Manhole.complete in place the sum of: EA 1 $2,010.00 $2,010.00 $2,100.00 $2,100.00 $2.000.00 $2,000.00 $2,850.00 $2,850.00 $2,200.00 $2,200.00
132 5'Storm Sewer Box Manhole wl Type"A"Inlet top.complete in place the sum of: EA 1 $2,180.00 $2.180.00 $2,200.00 $2.200.00 $2,700.00 $2,700.00 $3,500.00 $3,500.00 $2,800.00 $2,800.00
133 Trench safety for all storm sewers greater than 5'deep,complete in place the sum of: LF 300 $0.51 $153.00 $1.00 $300.00 $0.10 $30.00 $0.25 $75.00 $0.25 $75.00
TOTAL DRAINAGE ITEMS(CR 94 TO COUNTRY PLACE): $16,522.00 $26,660.00 $18,230.00 $18,975.00 $30,475.00
SUPPLEMENTAL ITEMS(ALL PROJECT LOCATIONS):
Well pointing for storm sewer,all sizes,all depths,including all necessary appurtenances,complete in place
134 the sum of: _ L.F. 800 $23.00 $18,400.00 $20.00 $16,000.00 $20.00 $16,000.00 $30.00 $24,000.00 $20.00 $16,000.00
Well pointing for water lines or sanitary sewer,all sizes,all depths,including all necessary appurtenances,
135 complete in place the sum of: L.F. 250 $23.00 $5,750.00 $20.00 $5,000.00 $20.00 $5,000.00 $20.00 $5,000.00 $20.00 $5,000.00
-
Wet condition bedding for storm sewer installation,all sizes,all depths,consisting of 12"crushed stone
136 fondatien,complete in place the sum of: _ L.F. 800 $13.00 $10,400.00 $5.00 $4,000.00 $5.00 $4,000.00 $5.00 $4,000.00 $7.50 $6,000.00
Wet condition bedding for water line or sanitary sewer installation,all sizes,all depths,consisting of 12"
. 137 crushed stone foundation,complete in place the sum of: L.F. 250 $6.00 $1,500.00 $5.00 $1,250.00 $5.00 $1,250.00 $5.00 $1,250.00 $5.00 $1,250.00
Wet condition bedding for manhole and junction manhole construction,all sizes,all depths,complete in place
138 the sum of: EA. 6 $500.00 $3,000.00 $500.00 $3,000.00 $500.00 $3,000.00 $500.00 $3,000.00 $500.00 $3,000.00
139 Solid sheet shoring system for storm sewer,all sizes,all depths,complete in place the sum of: L.F. 100 $10.00 $1,000.00 $10.00 $1,000.00 $10.00 $1,000.00 $10.00 $1,000.00 $10.00 $1,000.00
140 Installation and removal of piezometers,complete in place the sum of: EA. 8 $100.00 $800.00 $100.00 $800.00 $100.00 $800.00 $100.00 $800.00 $100.00 $800.00
141 Install extra cement stabilized sand backfill,complete in place the sum of: C.Y. 100 $20.00 $2,000.00 $20.00 $2,000.00 $20.00 $2,000.00 $20.00 $2,000.00 $20.00 $2,000.00
142 Install extra bank sand backfill,complete in place the sum of: C.Y. 100 $15.00 $1,500.00 $15.00 $1,500.00 $15.00 $1,500.00 $15.00 $1,500.00 $15.00 $1,500.00
143 Extra Type'D'asphalt pavement,complete in place the sum of: TON 100 $75.00 $7,500.00 $75.00 $7,500.00 $75.00 $7,500.00 $75.00 $7,500.00 $75.00 $7,500.00
144 Extra crushed limestone base material,complete in place the sum of: TON 50 $30.00 $1,500.00 $30.00 $1,500.00 $30.00 $1,500.00 $30.00 $1,500.00 $30.00 $1,500.00
Brace,support and protect utility structures as per Utility Company's requirements,complete in place the sum
145 of: EA. 1 $1,000.00 $1,000.00 $3,500.00 $3,500.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00
146 Extra polyethylene service tubing,all sizes,all depths.complete in place the sum of: _ L.F. 100 $7.00 $700.00 $7.00 $700.00 $7.00 $700.00 $7.00 $700.00 $7.00 $700.00
147 8'x8"tapping sleeve and valve with box,complete in place,the sum of: EA. 1 $4,020.00 $4,020.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $4,000.00 $4,000.00
148 Abandon and grout-fill existing storm sewer and culverts,all depths,all sizes,complete in place,the sum of: C.Y. 50 $100.00 $5,000.00 $100.00 $5,000.00 $100.00 $5,000.00 $100.00 $5,000.00 $125.00 $6,250.00
Reinforced filler fabric barrier,Including repair and replacement,and maintenance,complete In place the sum
149 of: L.F. 50 $3.00 $150.00 $3.00 $150.00 $3.00 $150.00 $3.00 $150.00 $3.00 $150.00
Remove and replace existing wood fence,all types,as directed by the site representative,complete in place
150 the sum of: L.F. 900 $18.40 $16,560.00 $18.00 $16,200.00 $18.00 $16,200.00 $18.00 $16,200.00 $18.00 $16,200.00
Remove and replace existing barbed wire fence,as directed by the site representative,complete in place the
151 sum of: L.F. 500 $15.20 $7,600.00 $15.00 $7,500.00 $15.00 $7,500.00 $15.00 $7,500.00 $15.00 $7,500.00
152 Install tree wells,max.18'tall,with looting,complete in place the sum of: L.F. 100 $35.00 $3,500.00 $35.00 $3,500.00 $35.00 $3,500.00 $35.00 $3,500.00 $35.00 $3,500.00
153 12"water line adjustment,Including all fittings and appurtences,complete In place the sum of: _ EA. 1 $2,525.00 $2,525.00 $4,500.00 $4,500.00 $2,500.00 $2,500.00 $2,500.00 $2,500.00 $3,100.00 $3,100.00
154 8"water line adjustment,including all fittings and appurtences,complete In place the sum of: EA. 1 $1,210.00 $1,210.00 $3,700.00 $3,700.00 $1,200.00 $1,200.00 $1,200.00 $1,200.00 $2,000.00 $2,000.00
TOTAL SUPPLEMENTAL ITEMS(ALL PROJECT LOCATIONS): $95,615.00 $91,300.00 $84,300.00 $92,300.00 $89,950.00
EXTRA WORK ITEMS(ALL PROJECT LOCATIONS):
155 Earthwork(Drainage swales),atldepths,complete in place the sum of: LF 2,500 $1.30 $3,250.00 $2.00 $5,000.00- $1.00 $2,500.00 $2.00 $5,000.00 $3.00 $7,500.00
156 5'Storm Sewer Box Manhole wl Type"A"Inlet top,complete in place the sum of: EA 5 $304.00 $1,520.00 $2,500.00 $12,500.00• $3,000.00 $15,000.00 $3,100.00 $15,500.00 $3,700.00 $18,500.00
157 24"RCP,ASTM C76,Class III storm sewer,complete in place the sum of: LF 500 $30.85 $15,425.00 $38.00 $19,000.00 $27.00 $13,500.00 $45.00 $22,500.00 $38.10 $19,050.00
158 Adjust existing manhole frame and cover to grade,complete Inplace the sum of: EA 2 $203.00 $406,00 $120.00 $240.00 $250.00 $500.00 $350.00 $700.00 $500.00 $1,000.00
159 8"minimum thickness concrete driveway,complete in place the sum of: SY 50 $46.80 $2,340.00 $40.00 $2,000.00 $100.00 $5,000.00 $40.00 $2,000.00 $40.00 $2,000.00
160 2'Sch.40 PVC water line for irrigation,including all fittings and appurtuences,complete in place the sum of: LF 500 $3.05 $1,525.00 $1.42 $710.00 $4.00 $2,000.00 $3.50 $1,750.00 $5.00 $2,500.00
161 Trench safety for all storm sewers greater than 5'deep,complete in place the sum of: LF 100 $0.51 $51.00 $1.00 $100.00 $0.10 $10.00 $0.25 $25.00 $0.25 $25.00
Bid No.0109-19
NDB 08-051 • 4 of 5
City of Pearland,Texas
McHard Road Improvements and Reconstruction Project(County Rd.94 to Cullen Blvd)
BEYER CONSTRUCTION, CROSS ROADS INDUSTRIES, TEXAS STERLING REDDICO CONSTRUCTION
L.P. INC. CONSTRUCTION CO. TRIPLE B SERVICES,LLP COMPANY,INC.
ITEM ITEM DESCRIPTION UNIT QUAN. UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL _
NO. PRICE AMOUNT PRICE AMOUNT PRICE _ AMOUNT PRICE AMOUNT PRICE AMOUNT
162 45 Gal.Live Oak,as shown on Landscaping Plan,complete In place the sum of: EA 2 $365.00 $730.00 $216.00 $432.00 $450.00 $900.00 $405.00 $810.00 $360.00 $720.00
TOTAL EXTRA WORK ITEMS(ALL PROJECT LOCATIONS)! - $25,247.00 $39,982.00 $39,410.00 $48,285.00 $51,295.00
. SUMMARY
(A) TOTAL SITE PREPARATION ITEMS(ALL PROJECT LOCATIONS), $249,594.22 • $423,200.00 $355,450.00 $162,330.00 $280,700.00
(B) TOTAL STORM WATER SEWER POLLUTION PREVENTION ITEMS(COUNTRY PLACE TO CULLEN), $18,037.50 $19,080.00 $17,527.50 $19,212.50
$20,826.00
(C) TOTAL PAVING ITEMS(COUNTRY PLACE TO CULLEN $1.605,312.80 $1,447,160.05 $1,498,057.50 $1,573,963.50 $2,348,836.25
(D) TOTAL DRAINAGE ITEMS(COUNTRY PLACE TO CULLEN) $779,792.30 $876,700.00 $875,120.00 $1,049,675.00 $935.058.50
(E) TOTAL BRIDGE ITEMS(COUNTRY PLACE TO CULLEN), $742,419.40 $730,095.00 $826,915.00 $694,410.00 $1,013,130.00
(F) TOTAL TRAFFIC SIGNAL AND LIGHTING ITEMS(COUNTRY PLACE AND CR 94)! _ $464,177.50 $476,875.00 $345,700.00 $498,700.00 $541,817.50
(G) TOTAL LANDSCAPING AND IRRIGATION ITEMS(COUNTRY PLACE TO CULLEN)_ $77,535.50 $55,212.60 _ $78,330.00 $84,910.00 $95,302.00
(H) TOTAL STORM WATER POLLUTION PREVENTION ITEMS(CR 94 TO COUNTRY PLACE)! $9,197.00 $8,940.00 $5,780.00 $8,810.00 $9,855.55
Ill TOTAL PAVING ITEMS(CR 94 TO COUNTRY PLACE)! $809,281.40 $772,726.05 $898,493.50 $829,155.75
$949,042.15-
(J) TOTAL DRAINAGE ITEMS(CR 94 TO COUNTRY PLACEL $16,522.00 $26,660.00 • $18,230.00 $18,975.00 $30,475.00
(K) TOTAL SUPPLEMENTAL ITEMS(ALL PROJECT LOCATIONS), $95,615.00 $91,300.00 $84,300.00 $92,300.00 $89,950.00 '
(L) TOTAL EXTRA WORK ITEMS(ALL PROJECT LOCATIONS)! $25,247.00 $39,982.00_ $39,410.00 $48,285.00 $51,295.00
TOTAL BASE BID ITEMS(ITEMS A-J), $4,771,869.62 $4,836,648.70 $4,919,603.50 $4,940,141.75 $6,225,042.95
TOTAL BASE BID,SUPPLEMENTAL,&EXTRA WORK(ITEMS A-L) _$4,892,731.62 $4,967,930.70 $5,043,313.50 $5,080,726.75 $6,366,287.95
Bid Na.0109-19
NDB 08-051
5 of 5
McHard Road Extension(Country Place Blvd.to Cullen)
Revised Cost Estimate 4-1-09
I 1 I
ITEM ITEM DESCRIPTION UNIT QUAN. 100%Submittal Engineers Cullen Project
NO. _ Estimate Project STP 2009(283) Magnolia Road Expansion
Unit Price Cost Unit Price Cost Unit Price Cost
SITE PREPERATION ITEMS:
1 Mobilization,complete in place the sum of:(3%MAXIMUM) LS 1 $50,000.00 $50,000_S165,000.00 $165.000 $150,000.00 $150,000
2 Site Preperation,complete in place the sum of: LS 1 $25,000.00 $25,000 S25,000.00 $25,000 $25,000.00 $25,000
3 Clearing and Grubbing,complete in place the sum of: AC 5.1 $5.000.00 $25,500 S5 000.00 $25.500 $5,066.67 $25.840
Removal and disposal of existing fences,all types,as indicated on the drawings,complete in
4 place the sum of: LF 550, $7.00 $3,850 $7.00 $3,850 $3.19 $1,753
Removal and stockpile of existing concrete slab,STA 58+00,100'RT,complete in place the
5 sum of: EA 1 $1,600.00 $1,600 $1,600.00 $1,600 $1,600.00 $1,600
Remove and dispose of existing septic tank and system,STA 58+25, 105'RT,complete in
6 "place the sum of: EA 1 $500.00 $500 $500.i i $500 $500.00 $500
7 Traffic control and regulations,complete in place the sum of: LS 1 $20.000.00 $20,000 520,000.00 $20,000 $20,000.00 $20,000
8 Flagger,complete in place the sum of: LS 1 $20,880.00 $20,880 $20,880.00 $20,880 $20,880,00 $20,880
9 Project Signs,per specification,complete in place the sum of: LS 1 $800.00 $800 $800.00 $800 $800.00 $eoo
TOTAL SITE PREPERATION ITEMS: $148,130.00 $263,130.00 $246,372.67
STORM WATER POLLUTION PREVENTION ITEMS:
10 Filter Fabric fence,complete in place the sum of: LF 12,600 $1.20 $15,120 $2.96 $37,338 $0.88 $11,130
11 Reinforced Filter Fabric fence,complete in place the sum of: LF 450 $2.00 $soo $2.00 $900 $1.22 $548
12 Rock Fitter Dam,complete in place the sum of: EA 2 $z.000.00 $4,000 $2,000.00 $4,000 $2,000,00 $4 000
Inlet Protection Barrier(For existing and proposed Stage 1 and 2 Inlets),complete in place the
13 sum of: EA 39 $70.00 $2,730 $67.07 $2,616 $70.00 $2,730
14 Stabilized construction exit,complete in place the sum of: EA 2 $2,500.00 $5,000 S2.500.00 $5,000 >2s00.00 $5,000
TOTAL STORM WATER POLLUTION PREVENTION ITEMS: $27,750.00 $49,853.60 $23,407.50
PAVING ITEMS:
15 Roadway Fill,complete in place the sum of: CY 11,100 $8.50 $94,350 $5.53 $61,420 $5.04 $55,981
16 Construction Excavation,complete in place the sum of: CY 2,960 $10.00 $29,600 $2.90 $8,594 $6.00 $17,760
17 8"minimum thickness hydrated lime stabilized subgrade,complete in place the sum of: SY 29,020 $5.15 $149,453 $1.49 $43,240 $1.96 $56,879
18 Hydrated lime,complete in place the sum of: TON 670 $140.00 $93,800 $143.67 $96,257 $138.33 $92,683
19 10"minimum thickness reinforced concrete pavement,complete in place the sum of: SY 26,900 $47.50 $1,277,750 $45.43 $1,222,157 $47.58 $1,279,992
20 Standard 6"concrete curb,complete in place the sum of: LF 19,300 $3.00 $57,900 $3.07 $59,187 $2.50 $48,250
21 6'Wide Concrete Sidewalk,4"min.thickness,complete in place the sum of: SF 56,350 $6.75 $380,363 $6.75 $380.363 $3.43 $193,427
_22 Adjust existing manhole frame and cover to grade,complete in place the sum of: EA 2 $750.00 $1,500 $750.00 $1,500 $750.00 $1,500
23 Block Sod,complete in place the sum of: SY 7,200 $4.10 $29,520 $4.10 $29,520 $3.68 $26,520
24 Hydromulch seeding disturbed areas wihtin R.O.W.,complete in place the sum of: AC 7 $1,800.00 $12,600 $1,800.00 $12,600 $13,578.33 $95,048
25 6-ft tall wood fence,complete in place the sum of: LF 860 $25.00 $21,500 $25.00 $21,500 $r, 3 $21,500
26 6-ft tall wood emergency access gate,30-ft wide,complete inplace the sum of: EA 1 $2,500.00 $2,500 $2,500.00 $2,500 $2.506.00 $2,500
27 4-ft tall barbed wire fence,complete in place the sum of: , LF 340 $12.00 $4,080 $12.00 $4,080 $12.00 $4,080
28 4-ft tall access gate,complete in place the sum of: EA 2 $900.00 $1,800 s„no on $1,800 $900.00 $1,800
29 8"minimum thickness concrete driveway,complete in place the sum of: SY 325 $56.00 $18,200 1148.1 H $15,657 $44.33 $14,408
30 Paving Header,complete in place the sum of: LF 90 $10.00 $900 !'; $900 $10.00 $900
31 Lane Divider Striping,complete in place the sum of: LF 12,775 $2.50 $31,938 ._ $31,938 $2.50 $31,938
32 12"Crosswalk striping,complete in place the sum of: LF 70 $6.50 $455 $455 $6.50 $455
33 24"Stop Stripe,complete in place the sum of: LF 100 $ltoo $1,100 $1,100 $i 1.00 $1,100
34 Wheelchair curb ramps,complete in place the sum of: EA 16 $300.00 $4,800 $4,800 $300.30 $4,800
35 Remove existing drainage easement gates,complete in place the sum of: EA 2 $500.00 $1,000 $1,000 $500.00 $1,000
36 Sidewalk/Inlet structure,complete in place the sum of: EA 3 $1,000.00 $3,000 $3,000 $1,000.00 $3,000
37 Retaining wall,complete inplace the sum of: LF 175 $150.00 $26,250 $26,250 $150.00 $26,250
38 4"yellow lane divider striping,complete in place the sum of: LF 3,220 $1.70 $5,474 $5,474 $1.70 $5,474
39 Raised pavement markers,complete in place the sum of: EA 165 $12.00 $1,980 $1,980 $12.00 $1,980
40 8"Solid white lane divider stripe,complete in place the sum of: LF 210 $3.50 $735 53 5u $735 $735
8 8 < 0 OS v O - S8nNSNOn08 SSN E, SOFzN ES
wN 8 ^ e) b Ni n ^ z. O pN N Y H N H N m�j W b H
. M ; NH . NH . 67%6
N N
N
NN N
"' 2 2 8 8 0 2- 8 8 8 m 2 M m <`3 8 u2i a S 8. o "' - . 8 8 8 8 8 8 OO b E S 8 '8 o 00 0 0 8 0 8 o e 8
,- t� O O t000 O f" 2 4O o vp�) O O O O c O N O
vYA H N N O H p H K of o H o o VH O tp O .�t- O vn' S d7 < j N S N O_ S TO O M N OH H RI'
di N3 H w W H d' vY p� a H W a a a U <n a 2 a �S H. K1 74 en u3 H
a' s m h 8 N 1" N N yy S ^ P N mo N N 8 N S O O 8 O N L OO vOi 0 S W S off O N S O o N n g O S g. ^ ^ S S
N H H N 0 0 � � N A O h S m b O O - N � � � T N O _
<V V N al <7 v7 �p O a W W n N N la GD N
a N NH H H M d .W N N 4, 40 , N H H „ H H p N M H H t H N H . . . . N W N M K N 4 N N
MN 8 N a
a w
28882
888882228F888888888888888 88 88888888 m CZ; 8 8128 28 0
N K N SmaOO � nO 8b SSpO p N 8H uWWN H W3p - �HN
9 NHNY 9NMyNHNW HwHW Mw --
4,7r `°' o8 . nrn4m $ m c Ea' cO m O ein 888c884 40cm $ 0 88 8K W K H H ni - a " n 1 O i ^ vi vi V n n i ^ N "' - p G O NH - tV
q pwN H NHN H9M w NW N N N y
H H N N N W W . St N NgN N HNHH NN
N b
H N
C
m
J
0
° s 8 8 8 8 8 888888888888888888888888 88 8 8 6 8 8 8 8 88 8 8 8 8 8 8 8 8
6 W �p C G n y N N C C G G G C C C N O O O 6 66 6 6 6 6 6 C G N G O C G O
<A N W N S 0 8 m 2 <O,) n 2 O T mm Om O 8 8 8 p S W pp S 6p �O N O N
m O H CV CV .N N N N O H ,0 . . . . . . . N H S v) O C�C S r n S O N N N S O S o N N N N N H N
m N H H a a a a a N M W W N . H
U
. 40
m a
a m O O O C')M O O N t() 0 O 0 0 0 O N 0 0 0 O N M a M M N M N'-0 N O O U) a 0 0 0
` m O n N a 000 M n M O N a M n O W 0 U)N V M<O 00 a N cO
E n M ' a n M a )<O N M '- a0 N N N M .- O
C -y a C) - a
o
0 W
N
O U LL LL LL ¢ ¢ } LL LL LL ¢LL LL LL W LL LL LL LL W LL }}O¢ ¢¢¢¢ ¢ ¢ ¢ ¢ ¢ ¢¢ ¢¢¢LL ). } } }LL L)LL U LL.
'C D J J J W W Q) J J J W J J J J J J J J J J U))J W W W W W W W W W W W W W W W J U U U U J J J J J
m a) ,
m
R
EtW y ° F
o H E
Q N W
'O Z m m ..()'
0 5 5 .0 O Q
U a U gZ
.. J O o O O D C !a N Q
Ei- E > > E9' ° ao `�yc
m O N N o lO O
m o 0 0 0 0 o .c 0 m m 0 a E y ° . E E 0 1-
t E E E E E E o m L o 0 a 0 o o y y a,0
O V- O J J O J m m V
0 o w y N N N y •• " m 0 0 m � E= E E m m c
m E E m m m m m m .� E o a M ro ro '0° o m c°) , y w - ..
m o o .0.c z .c .c .0 o 0 o O H c n a a- m = m a) m m m 5 .. o
., E mya)ommmmmmEEEE ^ � 5S.E=a a Sca�� mma. o E
m m ° u 0 U ° ° > > > > a, t .. - m m m m c c m c m m a a E E ..
m t E m m m m A H m N y m m.` _ _ ro._ E ci
Et ci. cm) m m 8 a a'S.a a a m m m S.a 0 0 o gI)a s°)w m a m , m c c°) ° m o
o m 0 o c c c'C c c C.0.0 E E E E W a: 6 a a m an d 0 y .. 5 E
E m E E° °-Al ' L m m m m m in a) cm) a)) cm).S<°13 a ° m a H o 0 0i o 3 a m a c c`ii 5 m E 2 cmi
y N 0 0 m.�S 8 o-a ma w a mn a a n.0 0.,Ii.0.0 Lt d o o°-a) c°) ° c°) an d o o in E m o y a.. _
m E N a a a c c0) c°i c°) c°) c°) c°i m d d d E a) mmm -y 5 a y H Sc 'c Y E E d d'c° N ° a) car d ° ° '0°
am) a a)0 o U o f E .S a m a a E ') a a a E c R E 0 ° 0 co c°) o o . E m.S m 0 o o a
`-0 10 E 0 ° u c°i a 3 3 3 3 3 3 a 4 a a E c ,c c w< ` `o a y y d m or a y a m o
a d 4 8 0 c H a m m 0 0 40 0 0 E E'E 0 ro m d d w = W 0 -o c.0 c c ro 0«_S .a E m m m
C, “At ' "
m N v) a, m ,A 0 0 0 0= 0 = C C 3 3 , - 0 ,,,L
.m Ea) 0 ,_m m n.ca-E 0 0 0 0 ° _O a an d.a o.a 0 m 2 i°U)V)w w rn a 0 d o; ' m in a
m a o,_ - o f E E E E E s a a a a m --
a o m.E c ° o 0 0 0 0 o t L n.as = m E E E '% -r T¢ o m o E E ` 0 c m a 0 d E
a o 0 _m cm) m �a 3 3 ai N o o o o N a a.a.a z m 8 c°) 8 3 3 3 3 o m c m o o a m m a E U a 2 a o 8
oC o N 5.C - umi um) 0 8 o A A O` O)C N a ai in m m m a U'S cn U) a .. d a C U J E C C
0.- m 0. in C 0 v) 0 v) 0 0-- I I m ro 5 0 0 0 0 0 0 0 0 = m 0 0 m U O m m m G0
d a' E m 0 E E m m a 0 0 0 0 m A 5 S c 0 t t a .C .0 m .C.0 O .0 °U 0 3 3 E o a ci ° o m d a
as 0 m c0i m in ; `o o E U U U U U U a`� - 0 0 m m A. 0 m m m m A m m rn c rn o[a[ 0 0 0 0 a J c U a a,x
c .a m o o m E 3 3 m m.5- D ; g 2 c a c %- m in A U E U U N- E E ;a
m m 0} a s m ' 0<o<a ro m<6<6 m m 3 3 m ;a o,x x x x x 5 0 5 x C c - J U c=U f0 c°) c°,;.
a s co J E= O N Na y n n n n n n N O c N a N c o 0 0 0 0 0 0 0 Wi t,,,7 to i0 O O N C) • o W
.6 m--Z 0 ja m U U U U V U y m m m m m m m m c c c c U U U U 3 0<a C C U
o E 3 U 0 n. m in°c), i_ i_ i_1_ E E E o'o � . o o c c° O J o, m._ c c
0-0 ; H w 7 y w w w H w H 0 0 0` o N S m , 3 3 3 3 3 3 3 d 1 a, 5 5 n '' o U m U v r°U
L d _o `a f/j�. m m U N N m N in H 5 m or� m m m m m m m m c c c c c m U v> 3
>.° Y d m m¢ ¢ ¢¢¢¢ mmaa d o 0fnV7(n(n(nu)tnV) . E E m ct -'m %% E
o ' 3 i0 W o m m m a:a_a_a-a-a:U U m m 0 o f E E E E E E E U 0 w w w ° ° c N ac 0 m °¢.`.C .0 O
o y m m a -C o 0 0 CL CE M¢ M m m U 0 o-U 0 0 0 0 0 0 0 o m m m m m. . . . WO ('
W E U o . c ,m cn x
4 (1) 4 5 5 E W E E E _ - . _ . _ in _ 0 aa)U)U) in in in in in in a a a a a x x 0 1-,5 ac) a d o S-= o
Na NadH Q LLLT2¢ Nn�) o°)vavai in Th=ioain i0"vininioa 5H HF4�i- coF W¢ m¢ CLUa00m
z 0
N M a N<D Q n m T O N M O<O n M M O N M a O<O n M M O N M a N W n M d7 O N M O<O n.
V a a a a a rc ,4 a a N to O O N O O N N O<O W O O O <O W 0 <O n N n n n n n n n n m N W DD O co...
D M a0 OD
0 m
McHard Road Extension(Country Place Blvd.to Cullen)
Revised Cost Estimate 4-1-09
89 Box Beam Conc. (16"x 60"),complete in place the sum of: L.F. 520 $215.00 $111,800 $215.00 $111,800 $215.00 $111,800
90 Reinforced Conc.Slab 5 inch(top of bridge)CL.S,complete in place the sum of: C.Y. 144 $650.00 $93.600 $650,00 $93.600 $650.00 $93,600
91 Armor Exp.Joints,complete in place the sum of: L.F. 320 $100.00 $32,000 $100.00 $32,000 $100.00 $32,000
92 Metal beam guard rail including SGT's and terminal anchors,complete in place the sum of: L.F. 360 $55.00 $19,800 $55.00 $19,800 $55.00 $19,800
TOTAL BRIDGE ITEMS: $1,038,260.00 $943,248.00 $1,034,949.20
TRAFFIC SIGNAL AND LIGHTING ITEMS:
Traffic Signal(FM 2234 @ East&West Countryplace Blvd.),per the drawings,include all
93 qauntities listed on the Summary of Traffic Signal Oaunities,complete in place the sum of: LS 1, $375,000.00 $375,000 $375.000.00 $375,000 $375,000.00 $375.000
Traffic Signal(FM 2234 @ Smith Ranch Road),per the drawings,include all gauntities listed on
94 the Summary of Traffic Signal Qaunities,complete in place the sum of: LS 1 $160,000.00 $160,000 $160,000 00 $160,000 $160,00000 $160,000
95 2"Sch 40 conduit for street lighting,complete in place the sum of: LF 12,350 $8.00 $98,800 $9.66 $119,342 $4.52 $55,781
96 Install of pull boxes provided by CenterPoint Energy,complete in place the sum of: EA 65 $10o.00 $6,500 $100.00 $6,500 $100.00 $6,500
TOTAL TRAFFIC SIGNAL AND LIGHTING ITEMS: $640,300.00 $660,842.17 $597,280.83
LANDSCAPING AND IRRIGATION ITEMS:
'2"Sch.40 PVC water line for irrigation,including all fittings and appurtuences,complete in place
97 the sum of: LF 5,230 $10.00 $52,300 $10.00 $52,300 $10.00 $52,300
6"PVC,Class 200,conduit for 2"Sch.40 PVC water line for irrigation,under pavement,
98 complete in place the sum of: LF 100 $25.00 $2,500 $25.00 $2.500 $2500 $2,500
99 2"Sch 40 conduit for irrigation electrical wires,complete in place the sum of: LF 260 $8.00 $2,080 S8 00 $2,080 $8.00 $2,080
2"irrigation line connection to existing water line,all types,at Cullen,complete in place the sum
100 of: EA 1 $500.00 $500 $500.00 $500 $500.00 $500
Irrigation line connection to existing water line,inlcuding water meter,by Southwest Water
101 Company,complete in place the sum of: EA 2 $3,500.00 $7,000 $3,500.00 $7,000 $3,500.00 $7,000
102 Irrigation control valve assembly,complete in place the sum of: EA 5 $1,000.00 $5,000 $1,000.00 $5,000 $1 000,00 $5,000
103 Irrigation reduced pressure back flow preventer assembly,complete in place the sum of: EA 5 $800.00 $4,000_ $800.00 $4,000 $800 00 $4,000
Irrigation control panel,including irrigation controller,rain sensor,meter box,electrical panel,
junction box,conduit,wiring,installation,mounting,foundation,all appurtuences and
104 programming to make the irrigation operational,complete in place LS 2 $2,500.00_ $5,000 $2,500.00 $5,000 $2,500.00 $5,000
105 45 Gal.Live Oak,as shown on Landscaping Plan,complete in place the sum of: EA 22 $475.00 $10,450 $475.00 $10.450 $475.00 $10,450
45 Gal.Crepe Myrtle'Basham's Party Pink',as shown on the Landscaping Plan,completein
106 place the sum of: EA 37 $360.00 $13,320 $360.00 $13,320 $292.67 $10,829
107 45 Gal.Bald Cypress,as shown on the Landscaping Plan,completein place the sum of: EA 10 $400.00 $4,000 $400.00 $4,000 $400,00 $4,000
108 30 Gal.Loblofly Pine,as shown on the Landscaping Plan,completein place the sum of: EA 27 $300.00 $8,100 $300.00 $8,100 $300.00 $8,100
109 Tree drip tubing assembly,for each tree,all types,complete in place the sum of: EA 96 $200.00 $19,200 $200.00 $19,200 $60.23 $5,782
TOTAL LANDSCAPING AND IRRIGATION ITEMS: $133,450.00 $133,450.00 $117,541.07
SUPPLEMENTAL ITEMS:
Well pointing for storm sewer,all sizes,all depths,including all necessary appurtenances,
110 complete in place the sum of: L.F. 800 $20.00 $16.000 $20.00 $16.000 $20.00 $16,000
Well pointing for water lines or sanitary sewer,all sizes,aU depths,including all necessary
111 appurtenances,complete in place the sum of: L.F. 250 $20.00 $5,000 $20.00 $5,000 $20.00 $5,000
Wet condition bedding for storm sewer installation,all sizes,all depths,consisting of 12"
112 crushed stone fondation,complete in place the sum of: L.F. 800 $5.00 $4,000 $5.00 $4.000 $5.00 $4.000
Wet condition bedding for water line or sanitary sewer installation,all sizes,all depths,
113 consisting of 12"crushed stone foundation,complete in place the sum of: L.F. 250 $5.00 $1,250 $500 $1,250 $5.00 $1,250
Wet condition bedding for manhole and junction manhole construction,all sizes,all depths,
114 complete in place the sum of: EA. 6 $500.00 $3,000 $500.00 $3.000 5500.00 $3.000
115 Solid sheet shoring system for storm sewer,all sizes,all depths,complete in place the sum of: L.F. 100 $10.0o $1,00o S1o.00 $1,000 $10.00 $1,000
116 Installation and removal of piezometers,complete in place the sum of: EA. 8 $100.00 $800 $100.00 $800 $100.00 $800
117 Install extra cement stabilized sand backfill,complete in place the sum of: C.Y. 100 $20.00 $2,000 $20.00 $2,000 $20.00 $2,000
118 Install extra bank sand backfill,complete in place the sum of: C.Y. 100 $15.00 $1,500 $15,00 $1,500 $15.00 $1,500
119 Extra Type'D'asphalt pavement,complete in place the sum of: _TON 100 $75.00 $7,500 175.rr,l $7,500 $75.00 $7,500
McHard Road Extension(Country Place Blvd.to Cullen)
Revised Cost Estimate 4-1.09
� $1,500
TON 50 $30.00
$1,500 $30.00. $1,500-'i1181�1
$1,005
120 Extra crushed limestone base material,complete in.lace the sum of: $�•°0° $1 00°'0° $700
III
1 $1,000.00 $1,000 $1.000.00 $700 $7.OU
Brace,support and protect utility structures as per Utility Company's requirements,complete in 100 $7 00 $700 $7 00 $3 ono
®Extraaca the sum of: $3,000 $3.o$7.0n
EA. 1 $a,000.00 $3,000 $a,000.00
® .ol en.sleevee servicean valve tubin.,all box,sizes,all deaths,com.letee iu.lace the sum of: $3,o00
®8"x6"ta.•in. and with complete in•lace,the sum of: $5,000 $100,)0
Ill
50 $100.00 $s,000 Swo.Oo
®Abandon and grout-fill existing storm sewer and culverts,all depths,all sizes,complete in place, $1so
the sum of: $150 ba•� $150 $'•0n
Reinforced filter fabric barrier,including repair and replacement,and maintenance,complete in ® 50 $3.00
® $16,200 $18.00 $16.200
®•lace the sum of: $16,200 $1a.u°
Remove and replace existing wood fence,all types,as directed by the site representative, 900 $1s.00
® $7,500 $1..00 $7,500
�com ove in.lace the sum of: $7,500 $1s.00
500 $1 s.00
®Remove and replace existing barbed wire fence,as directed by the site representative, ® $z.so0
com•lete in.lace the sum of: $2,500 xz,5oo00
1 $2,500.00 $2,500 $2,500.00
$1,200
ri 12"water line adustment,includin.all fittin•s and a..urtences,complete in.lace the sumo: $1,200 $1 2°°90 $ao2,50o
1 $1,200.00 $1,200 $1,200.00 $8U, 00-
$80,800.00-
Mom g"water line adustment,includin•all fittin.s and a••urtencesTOTAL SUPPLEMENTAL ITEMS: == -�- $2,034,827.46
111111111111111111111111111111111111111111111111 $2,297,414.50� $2,082 743.32
IIIIIIIIIIIIIIIIIII
TOTAL PAVING ITEMS:==
= $1,612,150.00 NMI 111111111111111.1111� $1 418 016.22= $1,203,832.55
111111111111111111111
lin TOTAL DRAINAGE ITEMS:_-= IIIIIIIIIIIIIIIIIIINMI IIIIIIIIIIIIIIIIIIII
$1,038,260.00 iiii $943,248.00 $1,034,949.20
NMI TOTAL BRIDGE ITEMS:=
5640,300.00 103% $660,842.17 93 io $597,280.83
NM TOTAL TRAFFIC SIGNAL AND LIGHTING ITEMS= IIIII-
NMI
IIIINININIIIIII
111111 $133,450.00� $133,450.00 88°0 $117,541.07
TOTAL LANDSCAPING AND IRRIGATION ITEMS:NM illi $80,800.00 100% $80,800•00 }1.10111.0111.1
00 orni $80,800.00
_ TOTAL SUPPLEMENTALITEMS:
= TOTAL BASE BID ITEMS:_-- $5,802,374.50 $5,319,099.70 87% $5,069,231.11
IIIIIIIIIIIIIIIIII
_ IIIIIIIo �.r�-322-
— TOTAL BASE BID WITH 5/CONTINGENCY=== $6,092,493.23 $5,585,054.69
•
City of Pearland Construction Cost Estimate - Final HER Job No.09-039
McHard Road Extension (Country Place to County Road 94)
Item Item Description Unit Quantity Unit Price Cost
Site Preperation Items
1 Mobilization,complete in place the sum of: LS 1 $50,000.00 $50,000
2 Site Preperation,complete in place the sum of: LS 1 $25,000.00 $25,000
3 Clearing and Grubbing,complete in place the sum of: AC 0.2 $5,000.00 $1,150
4 Traffic control and regulations,complete in place the sum of: LS 1 $10,000.00 $10,000
5 Flagger,complete in place the sum of: LS 1 $20,880.00 $20,880
6 Project Signs,per specification,complete in place the sum of: LS 0 $800.00 $0
Storm Water Pollution Prevention Plan:Items:
Filter Fabric fence,complete in place the sum of: LF 6,077 $1.20 $7,292
Inlet Protection Barrier(For esisting and proposed Stage 1 and 2
Inlets),complete in place the sum of: EA 17 $70.00 $1,190
Stabilized construction exit,complete in place the sum of: EA 2 $2,500.00 $5,000
Paving Items:
Roadway Fill,complete in place the sum of: CY 4,939 $8.50 $41,979
Remove existing pavement SY 17,581 $10.00 $175,810
8"minimum thickness hydrated lime stabilized subgrade, 20,337
_ _ __ complete in place the sum of: SY $5.15 $104,736
Hydrated lime,complete in place the sum of: _ TON 437 $140.00 $61,180
10"minimum thickness continuous reinforced concrete pavement, 17,581
complete in place the sum of: SY $47.50 $835,105
Standard 6"concrete curb,complete in place the sum_of: LF 12,104 $3.00 $36,311
Block Sod,complete in place the sum of: - SY 9,441 $4.10 $38,708
8"minimum thickness concrete driveway,complete in place the
sum of: SY 116 $56.00 $6,496
Paving Header,complete in place the sum of: LF 123 $10.00 $1,230
Lane Divider Striping,complete in place the sum of: LF 6,043 $2.50 $15,108
Drainage Items
Adjust existing manhole frame and cover to grade,complete in
place the sum of: EA 3 $750.00 $2,250
Adjust existing manhole frame with new grate cover to grade,
complete in place sum of: EA 6 $1,000.00 $6,000
Adjust existing Type"C"Inlet to grade,complete in place the sum
of: EA 4 $750.00 $3,000
Adjust existing Type"C"Inlet with open back to grade,complete in
place the sum of: EA 1 $750.00
Adjust existing Type"B-B"inlet to grade,complete in place the
sum of: EA 3 $750.00 $2,250
Adjust existing Type"B-B"inlet with open back to grade,complete
in place the sum of: EA 2 $750.00
Type"C"inlet,including foundation and backfill,complete in place
the sum of: EA 1 $2,100.00 $2,100
Type"B-B"inlet,including foundation and backfill,complete in
place the sum of: EA 1 $2,000.00 $2,000
' 4'Storm Sewer Box Manhole,complete in place the sum of: EA 1 $2,650.00 $2,650
5'Storm Sewer Box Manhole w/Type"A"Inlet top,complete in
place the sum of: EA 1 $3,750.00 $3,750
7-14-09 Page 1 of 2
City of Pearland Construction Cost Estimate - Final HDR Job No. 09-039
McHard Road Extension (Country Place to County Road 94)
Item Item Description Unit Quantity Unit Price Cost
Supplemental Items
Earthwork(Drainage swales),alldepths,complete in place the 2,500
sum of: LF $4.00 $10,000
5'Storm Sewer Box Manhole w/Type"A"Inlet top,complete in
place the sum of: EA 5 $3,750.00 $18,750
24"RCP,ASTM C76,Class III storm sewer,complete in place the 500
sum of: LF $70.00 $35,000
Adjust existing manhole frame and cover to grade,complete in
place the sum of: EA 2 $750.00 $1,500
8"minimum thickness concrete driveway,complete in place the
sum of: SY 50 $56.00 $2,800
2"Sch.40 PVC water line for irrigation,including all fittings and
appurtuences,complete in place the sum of: LF 500 $10.00 $5,000
Trench safety for all storm sewers greater than 5'deep,complete
in place the sum of: LF 100 $2.50 $250
Install Tree Wells,complete in place sum of: EA. 5 $1,000.00 $5,000
45 Gal.Live Oak,as shown on Landscaping Plan,complete in
place the sum of: EA 2 $475.00 $950 •
Install extra cement stabilized sand backfill,complete in place the
sum of: C.Y. 100 $20.00 $2,000
Install extra bank sand backfill,complete in place the sum of: C.Y. 100 $15.00 $1,500
Extra Type'D'asphalt pavement,complete in place the sum of: TON 100 $75.00 $7,500
Extra crushed limestone base material,complete in place the sum
of: TON 100 $30.00 $3,000
Reinforced filter fabric barrier,including repair and replacement, 100
and maintenance,complete in place the sum of: L.F. $3.00 $300
8"water line adjustment,including all fittings and appurtences,
complete in place the sum of: EA. 1 $1,200.00 $1,200
Subtotal Construction Cost $1,461,175
Supplemental $94,750
Estimated Construction Cost $1,555,925
7-14-09 Page 2 of 2
I.D71 CLAUNCH & MILLER
Engineering Consultants
August 19,2009
Ms. Cara Davis
City of Pearland
Projects Department
3519 Liberty Dr.
Pearland,TX 77581
Re: McHard Road Improvements and Reconstruction Project
(CountyRd.94 to Cullen Blvd.)
City of Pearland
Bid#0109-19
HDR Job No. 08-051
Dear Ms.Davis:
-On August 13, 2009, the City received five (5) bids for the above referenced project. The
following is a summary of our bid evaluation:
Bid Tabulation Sheet—Five(5)construction firms participated in the bidding process. Each bid
was checked for mathematical errors and/or bid irregularities. The project was bid with a base
bid, supplemental and extra work items. The base-bid includes the site preparation, storm water
prevention,paving, drainage, bridge, traffic signal and landscaping portions of the project.The
project was bid with the extension of McHard Road from Country Place Blvd: to Cullen.(Part 1)
and reconstruction of McHard Road from County Road 94 to Country Place Blvd (Part 2). As
discussed with City of Pearland staff, the total base bid, supplemental and extra work items were
utilized as a,basis for award of the contract:The bids for the total project are as follows:
Contractor Total Bid
1 BEYER CONSTRUCTION, L.P. $4,892,731.62
2 CROSS ROADS INDUSTRIES,INC. $4,967,930.70
3 : TEXAS STERLING CONSTRUCTION CO. $5,043,313.50
4 TRIPLE B SERVICES,LLP- $5,080,726.75 5 . REDDICO CONSTRUCTION COMPANY,INC. $6,366,287.95
A copy of the bid tabulation is attached.
Qualifications and Experience Record --Beyer Construction L.P.provided a list of completed
similar projects, list of active on-going projects, and list of projects from the last 5-years. Please
see Section 2 of this report.
Telephone Conversations with References - Various references were contacted by telephone
and asked to respond to a series of questions. Generally, they were impressed with the work
HDR Engineering,Inc. 4635 Southwest Freeway Phone(713)62269264
Suite 1000 I Fax(713)622.9265
Houston,TX 77027-7139 ; www.hdrinc.com
Beyer Construction L.P. had performed and would use them again in the future. _Please see
Section 3 of this report. ;
Equipment & Proposed Subcontractors and-Suppliers- Beyer Construction L.P. provided a
list of equipment as well as their proposed subcontractors and suppliers list. Please see Section 4
of this report.
, Based-on the project information provided in the qualifications package,Beyer Construction L.P.
has performed projects similar to the McHard Road Improvements and Reconstruction Project.
Beyer"Construction L.P. appears to be a responsible firm that should be capable of performing
the specified work in a satisfactory manner. For these reasons, we recommend that the City of
Pearland award the McHard Road Improvements and Reconstruction Project (County Rd. 94 to'
Cullen.Blvd)to Beyer Construction L.P. for a total of$4,892,731.62.
If you have any questions,please contact me:. •
Sincerely,
" • HDR I'CLAUNCH&MILLER
4)e
Mr K ckey,P.E.
Project Engineer
Cc: Mr. Gerald L.Roberts,P.E.-.Brazoria County Engineering Department
Mr.Al Lentz,P.E.-Brazoria Drainage District No.4
Mr-Jaime Salinas,P.E. -Brazoria County M.U.D.#4
,