R2009-092 - 2009-06-01RESOLUTION NO. R2009-92 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING CHANGE ORDER NO. 1 ASSOCIATED WITH THE SH 288 /BELTWAY 8 UTILITY PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That Change Order No.1 associated with the SH 288 /Beltway 8 Utility Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Change Order No. 1 associated with the SH 288 /Beltway 8 Utility Project. PASSED, APPROVED and ADOPTED this the 1St day of June, A.D., 2009. Gnz/ TOM REID MAYOR ATTEST: P m1~....~..rrii. a" d .' ,. Q~p,R~ ~: .~ NG I MC r+- I Y SE ETAR ~`''~~ APPROVED AS TO FORM: ~~ ~ ~ DARRIN M. COKER CITY ATTORNEY Exhibit "A" Resolution 2009-92 CHANGE ORDER For SH288 ! BW 8 Utilities CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, Teaas 77581 vrww.cityofpearland.com/projects Date of Issuance: 5/14/Z009 Change Order No: 001 Contractor: Reddico Construction Comnany, Inc. COP Project No: W67072 Engineer: Pate Engineers PO#: 091724 Ezalanation• This change order encompasses the following: The use of wet sand construction bedding in-lieu of bank sand bedding in specific areas of the project where unforeseen changes in site conditions were discovered. Descriution of Work 1. Wet Sand Construction Please attach back-uD documentation Cost & Time Change Summary: Original Contract: Previous Change Order(s): Contract prior to this change order: Net increase (decrease) from this change order: Revised Contract: Cost Time $86,730.00 Days Cost Time $1,985,718.55 Days $ Days $ Days $86,730.00 Days S2 072,448.55 Days Finance Approval: ~4a..~ 1"~4ruc~ Date: a • i . E>9 Finance D for RE ED: RECOMM TD D: By: Date: lq f~ By: I - Date: 5~ J ri D ~ ign Engineer Constru Manager ACCEPTED*: B Date: ,~~~~ ~' ontractor APPROVE . By: ~ Date:6/J./09 ownet'Bi11 Eisen, City Manager *Contractor agrees to perform change(s) included in this Change Order far the price and time indicated. The prices for changes included alt costs associated with this Change order. No work is to be done until this dtange order is executcd. No paymatt m the Comracxor (or Caosuhant) shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced aad insofar as the original project drawings and specifications are incaosistent, this Change Order governs. Upon execution by all parties, the following chattges identified for the value and/or contract time shown, are made part of the contract. Admin 1 of 1 6. Revised 7/25/08 ~~ REDDICO CONSTRUCTION COMPANY, INC. Apri18, 2009 Mr. Terry Robinson, P.E. Omega Engineers Inc. 16350 Park Ten Place Suite 120 Houston, Texas 77084 Re: SH 288 / BW 8 Utilites City of Pearland COP Project No: W67072 Change Order Request Wet Sand Bedding per Plan Detail Dear Mr. Robinson, As per our conversation today instructing Reddico Construction Co., Inc. to use wet sand bedding as per the plan detail, the following cost is submitted for your approval. Please see the backup information supporting the unit prices as submitted. 1 '/s-inch Screened Rock @ 23.90 / to = 0.77 to / if = $ 18.40 1.1 Stabilized Sand @ $ 11.50 / to = 0.14 to / if = $ 1.61 Filter Fabric Liner @ $ 1.84 / sy / if = $ 2,76 Add Additional Spoil Disposal 0.18 cy / if @ $ 8.00 / cy $ 1.44 Add Additional Labor / if $ 1.85 Add Additional Equipment / if $ 1.35 Deduct for `A-A' Bank Sand Bedding 0.42 cy / if < $ 1.85 > Subtotal $ 25.56 / if Plus 15% Profit $ 3.84 / if Total Amount Requested $ 29.40 / if S( ~~~= `~ ~~ ~~ Please confirm acceptance of the Unit Price for Wet Sand Bedding as submitted. Best Re ds, Stephen C. R d c: attachment PATE +•••, ENGINEERS • • May 26;2009 • Mrs.TeresaBattenfield, P.E. • Deputy Projects Director City ofPearlancl 3519:Liberty Drive Pearlatid,TexaS 77581 keferefied! SH 288/Beltway 8 Utilities;PATE-,1011 No. 1717-002-00 Dear Teresa, On March 27, 2009 the -contractor submitted RFI No. 1 reqUeStiria- direction from,the engineer for the -construction Methods.to be used when wet sands/unstable soils ate ericcuthered. We responded that"with proper deEwatering, AA Bedding Detail,should be used through out itiq:projed. The Bedding and.Backfill for Wet Sand detail will be Used • if circumstanceS.are encountered where the AA detail cannot be -QurresPonSe was based upon the. recommendations Contained in the Oeoteehnical Study coopleted.by Tolunay-Wong Engineets Inc. during the design phase of this iproject The Geotechnical Study indicated that control Will be necessary during,corripletion ofthe project.: It is'the Contractors responsibility to control groundwater. The:Contract includes an extra work item for:&Watering, It Was anticipated that once the-Water was pulled down, the contractor would have a Stable trench bottom to install:the utilities. Unfortunately,unforeseen conditions have been encountered in the prOjett. While extensive dewatering-has been utilized during the project the contractor has encountered sandy pockets that dreatemote water leaking into the excavation causing an unstable trench bottom! When these unforeseen conditions were encountered we recommended the use of the 'Bedding and Backfill for Wet Sand"detail as.stated.th our teSponse to the 11F1. We.ftirther recommended the construction inspector witnesses the excavation and dewatering and approve the use of the.1"Bedding and Backfill fOr Wet Sand"where necessary. Although a detail for wet sand construction as included in the plans, we neglected to include apayitein for this detail: Reddico Construction comOany, Inc. submitted a cost of $2:9,210/foot for the additional materials,labor and-profit associated with the use of wet sand Construction bedding in lieu of bank sand bedding in areas of the project wherennforeSeen • changes in site conditions are:discovered. We have-reviewed this cost proposal and have determined it to be in line with typical costs for this work. Very truly yours; -• 4 ENGINEERS, 401111 40e fsr. —äu1 C. Wailick. P. $56, - Senior Project Manager J:m00\171700200 City of-Pearland Watgr.Sever and 1..ift Stiqion\450 CPS1060 Corms\C.O.t44; rcwonse:doc . . • HOUSTON • 13333 Northwest Freeway Suite 300 • Houstoo,Texas 77040•T:713.462.3178 F:713.462.1631 Toll Free:866.533.PATE(7283). www, .pa teeng.cOm