R2009-083 - 2009-05-18RESOLUTION NO. R2009-83 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING A UTILITY RELOCATION AGREEMENT ASSOCIATED WITH THE COWART CREEK DIVERSION PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain Utility Relocation Agreement associated with the Cowart Creek Diversion Project, a copy of which is attached hereto as Exhibit "A"and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a Utility Relocation Agreement associated with the Cowart Creek Diversion Project. PASSED, APPROVED and ADOPTED this the 18t" day of May, A.D., 2009. OM REID MAYOR ATTEST: ~ .,`'°Q~PRt,AN _'o~ . s ~- r-: Y NG I G, RM =-v~.. C Y S RETAR ...... APPROVED AS TO FORM: ~J ~ ~T'~ DARRIN M. COKER CITY ATTORNEY Exhibit "A" Resolution 2009-83 STANDARD UTILITY AGREEMENT ACTUAL COST -CITY County: Brazoria County Road: Near Veterans Rd (CR143) & Dare Rd (CR935) Project No.: DR0602 From: N/A CSJ: N/A To: N/A Road Project Letting Date: October 2009 This Agreement by and between the City of Pearland, Texas, ("City"), acting by and through its duly authorized official, and ExxonMobil Pipeline Company, acting by and through its duly authorized representative, ("Owner"), shall be effective on the date of approval and execution by and on behalf of the City. WHEREAS, the City has determined that it is necessary to make certain improvements to Cowart Creek Diversion Improvements, which said changes are generally described as follows: drainage improvements. WHEREAS, these proposed roadway improvements will necessitate the adjustment, removal, and/or relocation of certain facilities of Owner as indicated in the following statement of work: Install a new bored 14-inch diameter pipeline crossing, 172 feet more or less, under Brazoria County Road 143, at a depth deep enough to alleviate a conflict with proposed drainage culverts the City plans to install under County Road 143, in connection with its Cowart Creek Diversion Ditch project, as further described in Exhibit "A" and such work is described in Owner's Estimate (estimated at $439,703.00), which is attached hereto and made a part hereof as Exhibit "A-1", and which is prepared in form and manner required by 23 CFR 645, Subpart A, and amendments thereto; and WHEREAS, the Owner, has provided sufficient legal authority to the City to establish an interest in properties affected by the abovementioned roadway improvements. Said facilities are located upon such properties as indicated in the statement of work as described in Exhibit "A". NOW, THEREFORE, in consideration of the covenants and agreements herein contained, the parties mutually agree as follows: The City will pay for costs incurred in the adjustment or relocation of Owner's facilities to the extent authorized under Title 23, Code of Federal Regulations, Part 645, Subpart A. The City's participation shall consist of One Hundred Percent (l 00%) of the cost of the adjustment or relocation. The Owner has determined that the method to be used in developing the adjustment or relocation costs shall be as specified for the method checked and described hereinafter: ^ (1) Actual direct and related indirect costs accumulated in accordance with a work order accounting procedure prescribed by the applicable Federal or State regulatory body. ® (2) Actual direct and related indirect costs accumulated in accordance with an established accounting procedure developed by the Owner and approved by the City. Subject to the participation percentage as set out above, the City will, upon satisfactory completion of the adjustment or relocation, and upon receipt of a final billing prepared in the form and manner prescribed by Federal regulations, make payment in the amount of One Hundred Percent (] 00%) of the eligible costs as shown in the final billing. The ftnal billing for work completed herein shall be submitted to the City not later than ninety (90) days after completion of the work. Upon receipt of the final billing and conclusion of the audit, the City agrees to pay Owner one hundred (100%) of its share of the eligible cost as indicated above. The City shall make payment within 45 days of acceptance of the final billing. Design 1 of 2 33. Revised 6/2008 In the event there is a substantial change for the statement of work contained in Exhibit "A", reimbursement is limited to One Hundred percent (100%) of the amount approved and actually expended pursuant to this agreement and its attached exhibits unless written approval is obtained from the City. All changes shall be documented on the Owner's "as-built" plans supplied to the City. City shall reimburse Owner for any additional cost or expense caused by any unreasonable delays waiting for City's written approval. Upon execution of this agreement by all parties, the City will, by written notice, authorize the Owner to proceed with the necessary adjustment or relocation, and the Owner agrees to prosecute such work diligently in accordance with the Owner's plans. Such plans are attached as Exhibit "B". Owner shall provide the City with forty-eight (48) hours written notice prior to proceeding with the adjustment or relocation and agrees to proceed in such a manner that will not result in avoidable delay or interference with the City's roadway construction. Should Owner by its actions cause interference or delay resulting in the imposition of damages to the City by a third party, Owner agrees to be responsible for damages, including attorney's fees, defense of claims and indemnification associated with said damages. Such authorization to proceed shall constitute notice on the part of the City that the relocation has been included in an approved program as an item of right of way acquisition, that a project agreement which includes the work has or will be executed, and that the utility relocation or adjustment will be required by the final approved project agreement and plans. The Owner will retain records of such costs in accordance with the provisions of 23 CFR Part 645, Subpart A. The Parties, by execution of this agreement, not waive any rights to which each party may legally have within the limits of the law. This agreement is subject to cancellation by the City at any time up to the date that work under this agreement has been authorized. City shall reimburse Owner 100% of all cost incurred by Owner up to the date of receipt of Notice of Cancellation. The City Auditor may conduct an audit or investigation of any entity receiving funds from the City directly under this contract or indirectly through a subcontract under this contract. Acceptance of funds directly under this contract or indirectly through a subcontract under this contract acts as acceptance of the authority of the City Auditor, to conduct an audit or investigation in connection with those funds. It is also expressly understood that the Owner conducts the adjustment, removal, or relocation at its own risk, and that the Owner agrees to indemnify and hold the City harmless for damage to existing facilities caused by the conduct of the Owner or any third party working on behalf of Owner. The signatories to this agreement warrant that each has the authority to enter into this agreement on behalf of the party represented. UTILITY CITY OWNER Owner: Exxon obil /Pipeline Company By: ~~~11 Title: Mana er, Right of Way & Claims narP~ ~ ` 22 - ~ °~ Design THE CIT F PEARLAND, TEXAS By: v----- R it isen Title: City Manager Date: May 18 2009 2 of 2 33. Revised 6/2008 EXXONMOBIL PIPELINE COMPANY ESTIMATE OF EXPENDITURES CHARGEABLE TO OTHERS G~V'T AND 3rd PARTY DAMAGE REIMBURSABLE PROJECT DATE: 4-Mar-O9 AFE NO: LocA~rloN of woRK: Pledger to Clear Lake Gas Plant 14" 42-440 TX-221 Cowart Creek CR 143 Pearland, Tx COMPLETE DESCRIPT[ON OF WORK TO BE PERFORMED & REASON: Displace and gas free approximately 20 miles of 14". Bell hole both sides of CR. 143 and bore a new x-ing at a lower elevation approximately 172 ft. long. Tie in new x-ing. Disamantle old pipe as close to edge of pavement and weld a cap on each end. Backfill and clean up. ~FC E/VED Adjustment for proposed new culverts for Cowart Creek under CR 143. Apq I g o9 EXPENSES REIMBURSED BY: Clty Of Pearland ~~~CiiP~~~.,t~, ~;,y. THIS ESTIMATE GOOD FOR 90 DAYS. QUANTITY COMPANY LABOR AMOUNT TOTAL DESCRIPTION: # DAYS DAY RATE 15 350 5250 1 TECH LEADER MAINTENANCE TECHNICIAN 160 0 WELDER 250 0 WELDER HELPER 160 0 5,250 PERSONAL EXPENSES OF COMPANY EMPLOYEES # DAYS DAY RATE OUT-OF-TOWN EXPENSES 75 0 OTHER: 0 COMPANY VEHICLE AND EQUIPMENT EXPENSE # DAYS DAY RATE 1 TECH LEADER's VEHICLE 15 50 750 GANG TRUCK 0 200 0 WELDING TRUCK 0 200 0 MULTI-TECH's VEHICLE 50 750 MATERIAL S PIPE (INCLUDING FREIGHT) PER FOOT 172 14" std wall pipe with FBE coating 98 16856 0 0 16,856 OTHER (INCLUDING FREIGHT) PER UNIT FBE weld joint coating 3000 4 14" Hot bends 2650 10600 13,600 CONTRACT LABOR AND EQUIPMENT AMOUNT TOTAL QUAN[TY ITEM k DAYS RATE EMS USA Cypress Creek Pipeline Maint. 15 0 262734 1050 0 740 0 0 0 750 0 60 0 575 0 350 0 190 0 650 0 500 0 1 Survey Crew 15 980 14700 1 Drafting 3 300 900 0 8000 0 0 75 0 190 0 75 0 278,334 CONTRACT HAULING TRIPS EQUIPMENT HAULING (ICC) 0 PIPE HAULING 0 OTHER 0 MISCELLANEOUS ITEMS RIGHT OF WAY EXPENSES PROPERTY DAMAGE EXPENSE 1000 1, 000 PAYROLL BURDEN & WELFARE EXPENSE (54% OF COMPANY LABOR) 5250 2835 2,835 SUB-TOTAL 318,625 ADMINISTRATIVE OVERHEAD (20% of SUB-TOTAL) 63725 63,725 SUB-TOTAL 382,350 CONTINGENCY 15 % OF SUB-TOTAL 57,353 TOTAL ESTIMATED EXPENDITURES 439,703 PREPARED BY: Steve CIOIII 1 00 % REIMBURSABLE = 439,703 BRAZORIA COUNTY , TEXAS \ H. T. & B. R. R. SURVEY, SEC. 31 .\\\ A-293 8" EMPCO T P OF 14" a 11PCO PIPELINE MARKER N 50°• 39' E" II II II II 30" KINDER MORGAN EDGE OF ROCK DRIVE 2073+43.8 EXiSTIN 8" EMPCO PROPOSED 14" EMPCO 4" EMPCO EDGE OF ROCK DRIVE 2074+03.0 CENTERLINE 45° FACTORY BEND METER POLE (2) EXISTING 8x8 BOX CULVERTS (TO BE REMOVED) 6" PIPE BARRICADE EXISTING CUT AND CAP TOP OF PRO OSED 14" EMPCO 0 CO d 0 C w CO 2074+50.0 6" PIPE BARRICADE U 1- CD IL} w ¢ CO 0 O tI- 00 Uj Csi CD CO CD 0 00 N.NN CENTERLINE OF DITCH 2074+76.6 5.1' TOP BANK N pj OD 0 -EN OF EDGE OF ASPHALT a) rn I` 0 EDGE OF ASPHALT Loa) Nr'7 ++ NN- 00 NN / TOP BANK 2075+35.8 TBM RR SPIKE IN POWER POLE CORRECTED EL-45.56' d ° . " a' .a stO (3) PROPOSED 12x7 BOX CULVERTS EXISTING BOX CULVERT 2075+42,5 BOX CULVERTS PROPOSED 0 Z w U 0 F-0 0 _I O w 0 Z UJ %rLLI OU 1.0 r co !_0 LO (.0 + ++ LO LOU-) 0 00 N C\ N 8 .EMIFC0a 45° corprxacia ,--4(.6NCn maincomlin +++++ L( .OL UD rw-r-r` ox0o CONTROL POINT 1 5/8" IRON ROD W/ CAP SET EL- 44. 85' EDGE OF ASPHALT DRIVE EDGE OF ASPHALT DRIVE 076+76.1 0 EXISTING 14" EMPCO d� d 20 40 SCALE 1" = 20' 30" KINDER MORGAN f! II PIPELINE MARKER VENT MAILBOX POWER POLE DITCH OVERHEAD ELECTRIC CENTERLINE CHAIN LINK FENCE' ""`BARBED 'MIRE r'FNCI 9.3' :/// / i//2///:- 0.8' ROPOSED (3 12x7 BOX CULVERTS EXISTING 3x8 BOX CULVERT (TO BE REMOVED) CENTERLINE OF 45' FACTORY BEND 1. REFERENCE DRAWING: PLEDGER TO CLEAR LAKE CAS PLANT, LOC. 42-440 ALIGNMENT SHEETS. 2- :THE BASIS OF BEARING FOR THIS SURVEY .IS THE BEARING SHOWN ON THE REFERENCE DRAWING - ALIGNMENT:` SHEET 14 of 18.. 3. VERTICAL CONTROL. IS .BASED ON T,B.M. 6 (ELEVATION = 44.22') OF THE PROJECT LAYOUT, SHEET 2 OF 77, OF THE COWART CREEK DIVERSION DITCH PROJECT, CITY OF PEARLAND PROJECTS DEPARTMENT, PREPARED BY JKC & ASSOCIATES, INC. THIS DRAWING' AND ALL INFORMATION HEREON IS THE PROPERTY OF EXXONMOBIL PIPELINE COMPANY AND SHALL NOT BE COPIED OR .USED EXCEPT FOR THE PURPOSE:FCR WHICH IT IS EXPRESSLY FUJRNISHED. THE DRAWING AND ANY COPIES THEREOF (PARTIAL OR COMPLETE) SHALL BE RETURNED TO THE OWNER UPON DEMAND. DRAWING STATUS PR E , ' Ll l'1 L4M A R LI FOR REVIEW AND COMVENTS ❑ APPROVED ❑ APPROVED AS MARKED BY DATE ExxonMob l Pipeline Company ENGINEERING SERVICES HOUSTON, TEXAS DESIGN.. ENGINEER DESIGN CHECK APPROVED APR 28 09 nth/ Di r r� 60 LEGEND 80 • X OE V v 5 9' RECEPft COWART CREEK DIVERSION DITCH PROJECT AT VETERANS (Co R. 143) 14" PLEDGER GAS PLANT TO CLEAR LAKE GAS PLANT TLC-221 LOC. 440 S & V SURVEYING, INC. PROFESSIONAL LAND SURVEYORS 20111 KRAHN SPRING, TEXAS 77388 OFFICE - (281) 353-2570 FAX - (281) 353-2407 E-MAIL - cadd@sysurveying.com W. 0. No. REVISION DATE DRN. CHK.. APR. DRAWN BY DRAWING. CHECK DATE Date: 7/15/08 Scale: H: 1"=20' V: 1 "= Drawn By. AF Job No.: 88100--015—C-PLC Checked By: GAM Drawing No. C-1825