Loading...
R2009-071 - 2009-04-27RESOLUTION NO. R2009-71 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH WATER AND SEWER IMPROVEMENTS WEST OF SH 288. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with the construction of water and sewer improvements, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to Hurtado Construction Company, in the amount of $420,095.90. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services for water and sewer improvements west of SH 288. PASSED, APPROVED and ADOPTED this the 27~h day of April, A.D., 2009. C~J~r) ~ ~ TOM REID MAYOR ATTEST: ~~QEARLq;~ Y NG L , T MC ~_ C SE ETARY ="`~ APPROVED AS TO FORM: ~~~: ~ DARRIN M. COKER CITY ATTORNEY • BID TABULATION FOR: CONSTRUCTION OF WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS ' CITY OF PEARLAND BRAZORIA COUNTY,TEXAS BID OPENING DATE: DECEMBER 9,2008 • ' -:.'BID OPENING LOCATION:. • LJA ENGINEERING 8 SURVEYING INC. . ; ;TABULATION BY: T.DELEON , TABULATION.91yTF1:f t ' .. , : 'I, '.i r ; DECEMBER 10,2008 UAJOBNO:',I' �: 1129-0003(9.2) • • TOTAL AMOUNT TOTAL AMOUNT BID ' . BIDDER'S NAME, • BID WI ALTERNATE • . 1)HURTADO CONSTRUCTION COMPANY • $425.520.90 $420,095.90 2)REDDICO CONSTRUCTION CO.,INC. $475,688.95 $473.383.95 • • 3)CROSTEXCONSTRUCTION $532268.40 $521,571.40 • . 4)JOEL A TRIMM CONST.CO.,INC. • $558,217.70 • $583,947.70 • 5)SLC CONSTRUCTION,LP. _ $563,47220 $584,639.00 ' ' 6)CLEARWATER UTILITIES,INC. $568,627.42 $566271.42 • 7)TRIPLE B SERVICES,LLP $573,431.00 $568,781.00 • . 8)BIG STATE EXCAVATION,INC. $597,735.15 $599,440.15 • 9)CRAVENS PARTNERS,LTD. $611,969.10 $606,699.10 • 10)LINCO CONSTRUCTION CO.,INC. $827,197.55 $614,952.55 11)MDA,INC. $668,712.00 $669,037.00 • CALENDAR DAYS-60/75 • NOTE-C.E.BARKER DID NOT INCORPORATE ALL OF THE ADDENDUMS Gj-a.`.... •.•..�•%.:5,' THEREFORE THEIR BID WAS NOT TABULATED. .r*r' -.Se-- � %•* )j i JEFFREY C.DE LEON i . •-BIDDER MATHEMATICAL ERROR f•' • iji.'/3\s 93803 1$ r1�i'�`/OENSV Ie fig,+ N E (. . • ,re• ce se 1d ta.rulatione tnie and correct 10113 OAAN0111291112130XERW¢t•Light:MS°BT..Y `d BID TABULATION FOR: CONSTRUCTION OF WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BID OPENING DATE: BRAZORIA COUNTY,TEXAS DECEMBER 9,2008 BID OPENING LOCATION: LJA ENGINEERING&SURVEYING INC. TABULATION BY: T.DELEON TABULATION DATE: DECEMBER 10,2008 LJA JOB NO, 1129-0003(9.2) . 1)HURTADO CONSTRUCTION COMPANY 2)REDDICO CONSTRUCTION CO.,INC. 3)CROSTEX CONSTRUCTION • ITEM DESCRIPTION UNIT OTY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST WATER ITEMS 1.12"PVC WATER PIPE,C-900,OR 18,ALL DEPTHS,TO INCLUDE BEDDING AND LF 1525 $24.05 $36,676.25 $2125 $32,40625 $24.50 537.382.50 ALL FITTINGS.COMPLETE IN PLACE 2 16"PVC WATER PIPE,C-905,DR 18,ALL DEPTHS,TO INCLUDE BEDDING AND LF 1317 $31.15 541,024.55 . $30.00 $39,510.00 $35.20 $46,358.40 ALL FITTINGS,COMPLETE IN PLACE . 3.FIRE HYDRANT UNIT,ALL DEPTHS.INCLUDES APPROPRIATE TEE,6"VALVE AND EA 9 53,500.00 ' $31,500.00 $3,130.00 $28,170.00 $2,750.00 524.750.00 • BOX,6'LEAD AND FIRE HYDRANT,COMPLETE IN PLACE 4.16"AW WA BUTTERFLY VALVE AND BOX,COMPLETE IN PLACE EA 2 $3,400.00 $6,800.00 82680.00 $5.360.00 $2,800.00 $5.600.00 5.12"GATE VALVE AND BOX,COMPLETE IN PLACE EA 6 $1,310.00 $7,860.00 $1.400.00 $8.400.00 51,510.00 . $9,060.00 6.REMOVE EXISTING 18"PLUG AND CLAMP AND 2"BLOW OFF VALVE AND BOX EA 1 $300.00 $300.00 $570.00 5570.00 5400.00 $400.00 AND CONNECT PROPOSED 16'WATER LINE,INCLUDES ALL NECESSARY ADAPTERS AND CONNECTORS,COMPLETE IN PLACE 7,TRENCH SAFETY SYSTEM,ALL DEPTHS,COMPLETE IN PLACE LF 2859 . $0.10 $285.90 $0.10 $285.90 $0.10 8285.90 8.2"BLOW OFF VALVE AND BOX,INCLUDES ANY NECESSARY ADAPTERS AND EA 4 5965.00 $3,880.00 5740.00 $2,960.00 $550.00 $2,200.00 CONNECTORS,COMPLETE IN PLACE 9.12"WELDED STEEL WATER LINE.INCLUDING COATINGS,BENDS,ELECTRICAL LF 155 5115.00 517,825.00 $105.00 516,275.00 $154.00 $23,870.00 INSULATION KITS,ADAPTERS,ETC.,COMPLETE IN PLACE 10.BORE FOR 16'WATER LINE(DOES NOT INCLUDE PIPE),COMPLETE IN PLACE LF 58 $46.00 $2,668.00 $57.00 $3,306.00 $35.00 $2.030.00 11.BORE FOR 12"WATER LINE(DOES NOT INCLUDE PIPE),COMPLETE IN PLACE LF 80 $34.00 $2.720.00 $41.30 $3,304.00 528.00 $2,240.00 12.EXCAVATION,HAUL AND COMPACTION OF UTILITY SPOIL FOR FILL OF EXISTING CY 870 $2.00 $1,740.00 5200 .$1,740.00 $2.50 $2,175.00 DITCH,COMPLETE IN PLACE SUBTOTAL WATER ITEMS $163,269.70 8142,287.15 8168,331.80 SANITARY SEWER ITEMS 1.12"PVC SEWER PIPE,ASTM D-2241,SDR 26,0-8'CLJT,TO INCLUDE BEDDING, LF 400 520.00 58,000.00 536.45 $14,580.00 $25.70 $10,280.00 COMPLETE IN PLACE 2.15"PVC SEWER PIPE,ASTM D3034,SDR 26.0'-8'CUT,TO INCLUDE BEDDING, $25.30 $20,240.00 $41.00 532,800.00 $31.00 COMPLETE IN PLACE 800 $24,800.00 3.15"PVC SEWER PIPE,ASTM D3034,SDR 28,8'-10 CUT,TO INCLUDE BEDDING, LF 1272 $25.30 $32,181.60 $43.10 354,823.20 $43.70 $55,586.40 COMPLETE IN PLACE 4.18"PVC SEWER PIPE,PS 46,F 679,0'-8'CUT,TO INCLUDE BEDDING, LF 20 $42.12 $842.40 $51.90 $1,038.00 $55.00 $1,100.00 COMPLETE IN PLACE 5.BORE 15'SANITARY SEWER UNDER EXISTING STORM SEWER,(EXCLUDING LF 40 $10.00 $400.00 $84.00 $3,360.00 $75.00 $3,000.00 PIPE),COMPLETE IN PLACE 6.STANDARD SANITARY SEWER MANHOLE FOR 6"-24"SANITARY SEWER PIPES, EA 9 $3,000.00 527,000.00 51,490.00 $13,410.00 $1,800.00 $16,200.00 (8'DEPTH),COMPLETE IN PLACE 7.EXTRA DEPTH OF STANDARD SANITARY SEWER MANHOLE,(OVER 8'DEPTH), VF 29.8 $100.00 $2,980.00 $82.00 $2,443.60 $125.00 $3,725.00 • COMPLETE IN PLACE 8.TRENCH SAFETY SYSTEM,ALL DEPTHS,COMPLETE IN PLACE . LF 2492 $0.10 $249.20 $0.25 $623.00 $0.10 $249.20 9.CONTRACTOR SHALL REMOVE EXISTING 15"SANITARY SEWER PLUG AND EA 1 $100.00 5100.00 $100.00 $100.00 $300.00 $300.00 CONSTRUCT PROPOSED SANITARY SEWER,COMPLETE IN PLACE 10.CONTRACTOR SHALL PLUG PROPOSED MANHOLEOS-104 FL(S)18"SANITARY EA 1 $100.00 5100.00 $170.00 $170.00 $200.00 $200.00 SEWER FOR FUTURE CONNECTION,COMPLETE IN PLACE 11.EXCAVATION,HAUL AND COMPACTION OF UTILITY SPOIL FOR FiLL OF EXISTING CY 830 .$2.00 $1,660.00 $2.00 51,660.00 $2.50 52,075.00 DITCH,COMPLETE IN PLACE SUBTOTAL SANITARY SEWER ITEMS $95,7$3 $126,007.80 $117,616.60 MANAGE FACILITIES ITEMS 1.EXCAVATION.HAUL,COMPACT AND HYDROMULCHSEEDING OF OUTFALL LF 410 $200 $820.00 $5.00 $2,050.00 $25.00 $10,250.00 ' DITCH,COMPLETE IN PLACE 2.4"THICK CONCRETE SLOPE PAVING.COMPLETE IN PLACE SY 38 $68.00 $2,584.00 $41.50 $1,577.00 $60.00 $2.280.00 3.REMOVE AND DISPOSE OF EXISTING 10'X T CONCRETE BOX CULVERT, LF 100 $64.00 56,400.00 $40.00 $4,000.00 $50.00 $5.000.00 COMPLETE IN PLACE 4.TYPE"C"MANHOLE TOP FOR BOX CULVERT,COMPLETE IN PLACE EA 1 • $3,000.00 $3,000.00 $2.220.00 $2,220.00 $1,500.00 $1,500.00 • 2 0<13 owww12,1112940331War wt.W90_5T.a. BID TABULATION FOR: CONSTRUCTION OF WATER,SANITARY SEWER AND DRAINAGE FACILITIES 'a TO SERVE WATER LIGHTS . CITY OF PEARLAND BRAZORIA COUNTY,TEXAS BID OPENING DATE: DECEMBER 9,2008 BID OPENING LOCATION: LJA ENGINEERING&SURVEYING INC. TABULATION BY: T.DELEON TABULATION DATE DECEMBER 10,2008 LJA JOB NO. 1129-0003(9.2) 1)HURTADO CONSTRUCTION COMPANY 2)REDDICO CONSTRUCTION CO.,INC. ' 3)CROSTEX CONSTRUCTION ITEM DESCRIPTION UNIT CITY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST 5.EXCAVATION,HAUL AND COMPACTION OF UTILITY SPOIL FOR FILL OF EXISTING CY 970 $2.00 $1,940.00 $2.00 $1,940.00 $2.50 $2.425.00 DITCH,COMPLETE IN PLACE 8.10'X T PRECAST REINFORCED CONCRETE BOX CULVERT(ASTM C-1433),ALL LF 240 $500.00 5120,000.00 $537.20 $128,928.00 $520.00 $124,800.00 CUTS,INCLUDING BEDDING,COMPLETE IN PLACE 7.TRENCH SAFETY SYSTEMS,ALL DEPTHS,COMPLETE IN PLACE LF. 240 $0.10 $24.00 $1.00 $240.00 $0.10 $24.00 8:STORM WATER POLLUTION PREVENTION PLAN COMPLIANCE,INCLUDING LS 1 $600.00 $600.00 $650.00 $650.00 $2,500.00 $2,500.00 MAINTAINING EXISTING FILTER FABRIC FENCE AND STABILIZED , 'CONSTRUCTION EXIT,COMPLETE IN PLACE SUBTOTAL DRAINAGE FACILITIES ITEMS $136,368.00 $141,606.00 $148,770.00 CLEARING AND GRUBBING ITEMS • 1.CLEARING AND GRUBBING,COMPLETE IN PLACE AC 3.39 $3.000.00 -$10.170.00 $1.500.00 $5,085.00 $1,560.00 $5.085.00 SUBTOTAL CLEARING AND GRUBBING ITEMS $10,170.00 $5,086.00 $5,066.00 MISCELLANEOUS ITEMS 1.STABILIZED CONSTRUCTION EXIT AT LOCATION SHOWN ON PLANS(TO BE EA 1 $1,200.00 $1,200.00 $1,200.00 $1,200.00 $1,700.00 $1,700.00 USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE 2,HYDROMULCH SEEDING AND FINE GRADING,(TO BE USED ONLY AT THE AC 1 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $1,000.00 $1,000.00 WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE 3.BROADCAST SEEDING,FERTILIZING,AND WATERING(TO BE USED ONLY AT AC 1 $600.00 $600.00 $600.00 $600.00 • $600.00 $600.00 THE WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE 4.COFFER DAM FOR INSTALLATION OF 1-10'X T BOX,(TO BE USED ONLY AT THE EA 1 $2,000.00 $2,000.00 $4,100.00 $4,100.00 $1,250.00 $1,250.00 WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE 5.REINFORCED FILTER FABRIC FENCE(SILT BARRIER FENCING),(TO BE USED LF 2670 $1.00 $2,670.00 $1.20 $3,204.00 $1.50 $4,005.00 ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE B.8'PORTABLE PUMP FOR REMOVAL OF WATER,COMPLETE IN PLACE HRS 500 512.00 56,000.00 $10.20 $5.100.00 $30.00 $15.000.00 7.12"PORTABLE PUMP FOR REMOVAL OF WATER,COMPLETE IN PLACE HRS 500 $14.00 $7,000.00 $15.30 $7.650.00 $40.00 $20,000.00 8.ADDITIONAL COST FOR STORM SEWER BEDDING AND BACKFILL FOR . LF 240 $5.00 $1,200.00 $10.00 $2,400.00 $10.00 $2,400.00 UNSATISFACTORY SOIL CONDITIONS(TO BE USED ONLY AS DIRECTED BY THE ENGINEER),COMPLETE IN PLACE 9.ADDITIONAL COST FOR SANITARY SEWER BEDDING AND BACKFILL FOR LF 700 $1.00 • $700.00 $10.00 $7,000.00 $5.00 $3,500.00 UNSATISFACTORY SOIL CONDITIONS(TO BE USED ONLY AS DIRECTED BY THE ENGINEER).COMPLETE IN PLACE 10.DEWATERING,(TO BE USED ONLY AS DIRECTED BY THE ENGINEER), LF. 700 $1.00 $700.00 $19.00 $13,300.00 $18.00 $12,600.00 COMPLETE IN PLACE 11.RESTRAINED JOINT SECTION FOR 12'WATER LINE,-(EITHER DUCTILE IRON OR LF 100 $38.00 $3,800.00 $60.00 $6,000.00 $155.00 $15,500.00 STEEL PIPE WITH MECHANICAL OR WELDED JOINTS),COMPLETE IN PLACE 12.RESTRAINED JOINT SECTION FOR 16'WATER LINE,(EITHER DUCTILE IRON OR LF 100 $53.00 $5,300.00 $78.50 $7,650.00 $210.00 $21,000.00 STEEL PIPE WITH MECHANICAL OR WELDED JOINT),COMPLETE IN PLACE 13.TEMPORARY BRACING OF POWER POLE BY CENTERPOINT,COMPLETE IN EA 4 $200.00 $800.00 $500.00 $2,000.00 $1,500.00 $6,000.00 PLACE SUBTOTAL MISCELLANEOUS ITEMS $32.970.00 $61,704.00 $104,666,00 ALTERNATE BID ITEMS 1.20'STEEL CASING,INCLUDING 12"PVC WATER PIPE,C-900,DR 18,ALL DEPTHS LF 155 $80.00. $12,400.00 $90.00 $13,950.00 $85.00 $13,175.00 AND ALL FITTINGS,(IN LIEU OF WATER ITEM NO.12),12'STEEL WATER LINE, COMPLETE IN PLACE SUBTOTAL ALTERNATE BID ITEMS $12,400.00 813,550.00 $13,176.00 3 0113 O:uuo+ti2an29manwa,upewso aT.m BID TABULATION FOR: CONSTRUCTION OF WATER.SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CRY OF PEARLAND BRAZORIA COUNTY,TEXAS BID OPENING DATE: DECEMBER 9.2008 BID OPENING LOCATION: UA ENGINEERING 8 SURVEYING INC. TABULATION BY: T.DELEON TABULATION DATE: DECEMBER 10,2008 LJA JOB NO. 1129-0003(92) • 1)HURTADO CONSTRUCTION COMPANY 2)REDDICO CONSTRUCTION CO.,INC. 3)CROSTEX CONSTRUCTION ITEM DESCRIPTION UNIT OW UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST BID SUMMARY . SUBTOTAL WATER ITEMS • $153259.70 $142.287.15 $156.331.80 SUBTOTAL SANITARY SEWER ITEMS $93,753.20 $125,007.80 • $117,515.60 SUBTOTAL DRAINAGE FACILITIES ITEMS $135,368.00 $141,605.00 $148,779.00 SUBTOTAL CLEARING AND GRUBBING ITEMS - $10,170.00 $5,085.00 $5,085.00 SUBTOTAL MISCELLANEOUS ITEMS $32,970.00 $61,704.00 $104,555.00 TOTAL AMOUNT BID $425,620.80 $476,868.95 $532,286.40 SUBTOTAL ALTERNATE BID ITEMS 512,400.00 $13,950.00 $13,175.00 TOTAL AMOUNT BID WI ALTERNATE $420,096.90 • $473,363.85 • $621,571A0 • • 4 of 13 au,vmnmknmamnwrLgowso er.es • BID TABULATION FOR: CONSTRUCTION OF WATER,SANITARY SEWER AND DRAINAGE FACILITIES a TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS BID OPENING DATE: DECEMBER 9,2008 BID OPENING LOCATION: LJA ENGINEERING&SURVEYING INC. TABULATION BY: T.DELEON TABULATION DATE: DECEMBER 10,2008 LJA JOB NO. 1129-0003(9.2) 4)JOEL A TRIMM CONST.CO.,INC. 5)SLC CONSTRUCTION,LP. 6)CLEARWATER UTILITIES,INC. ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST UNIT COST .TOTAL COST UNIT COST TOTAL COST WATER ITEMS • 1.12'PVC WATER PIPE,C-900,DR 18.ALL DEPTHS,TO INCLUDE BEDDING AND LF 1525 $22.85 $34.846.25 $24.83 $37,865.75 $20.40 $31,110.00 ALL FITTINGS,COMPLETE IN PLACE 2.16"PVC WATER PIPE,C-905,DR 18,ALL DEPTHS,TO INCLUDE BEDDING AND LF 1317 $33.15 $43,658.55 $36.63 $48,241.71 $31.85 $41,946.45 ALL FITTINGS,COMPLETE IN PLACE 3.FIRE HYDRANT UNIT,ALL DEPTHS,INCLUDES APPROPRIATE TEE,6"VALVE AND EA 9 $3,070.00 $27,630.00 $3,093.75 $27,843.75 $2,991.00 $26,919.00 BOX,6"LEAD AND FIRE HYDRANT,COMPLETE IN PLACE 4.16"AWWA BUTTERFLY VALVE AND BOX,COMPLETE IN PLACE EA 2 52,760.00 $5,520.00 $3,766.68 $7,533.36 $2,804.00 $5,608.00 5.12'GATE VALVE AND BOX,COMPLETE IN PLACE EA' 6 $1,400.00 $8,400.00 $1,681.25 $10,087.50 $1,448.00 $8,688.00 6.REMOVE EXISTING 16"PLUG AND CLAMP AND 2'BLOW OFF VALVE AND BOX EA 1 $1,165.00 $1,165.00 $856.25 $65625 $267.00 $267.00 AND CONNECT PROPOSED 16"WATER UNE,INCLUDES ALL NECESSARY ADAPTERS AND CONNECTORS,COMPLETE IN PLACE 7.TRENCH SAFETY SYSTEM,ALL DEPTHS,COMPLETE IN PLACE LF 2859 $2.00 $5,718.00 $2.50 $7,147.50 $0.30 $857.70 8.2'BLOW OFF VALVE AND BOX,INCLUDES ANY NECESSARY ADAPTERS AND EA 4 $618.00 $2,472.00 $625.00 $2,500.00 $385.00 $1,540.00 CONNECTORS,COMPLETE IN PLACE 9.12'WELDED STEEL WATER UNE,INCLUDING COATINGS,BENDS,ELECTRICAL LF 155 3234.00 $36,270.00 $132.19 $20,489.45 5131.10 $20,320.50 INSULATION KITS,ADAPTERS,ETC.,COMPLETE IN PLACE 10.BORE FOR 16"WATER LINE(DOES NOT INCLUDE PIPE),COMPLETE IN PLACE LF 58 $54.00 $3,132.00 $39.75 $2,305.50 $49.15 $2,850.70 11.BORE FOR 12"WATER LINE(DOES NOT INCLUDE PIPE),COMPLETE IN PLACE LF B0 $54.00 $4,320.00 $32.25 $2,580.00 $42.70 53,416.00 12 EXCAVATION,HAUL AND COMPACTION OF UTILITY SPOIL FOR FILL OF EXISTING CY 870 $2.30 $2,001.00 $3.65 $3,175.50 $3.20 $2,784.00 DITCH,COMPLETE IN PLACE SUBTOTAL WATER ITEMS 1175,132M S170,426.27 S148.307.35 SANITARY SEWER ITEMS 1,12"PVC SEWER PIPE,ASTM D-2241,SDR 26,0'-8'CUT,TO INCLUDE BEDDING, • LF 400 $21.40 $8,560.00 $31.56 $12 624 00 $29.75 $11 900 00 COMPLETE IN PLACE 2.15"PVC SEWER PIPE,ASTM D-3034,SDR 26,0'-8'CUT,TO INCLUDE BEDDING, IF 800 $26.75 $21,400.00 $37.13 $29,704.00 COMPLETE IN PLACE $34.00 $27,200.00 3.15'PVC SEWER PIPE,ASTM D-3034,SDR 26,8'-10'CUT,TO INCLUDE BEDDING, IF 1272 $28.10 $35,743.20 $38.75 $49,290.00$492900p $35.80 $45,537.60 COMPLETE IN PLACE 4.18'PVC SEWER PIPE,PS 46,F679,0'-8'CUT,TO INCLUDE BEDDING, LF 20 $33.55 $671.00 COMPLETE IN PLACE _ $56.25 $1,125.00 $44.40 $888.00 5.BORE 15'SANITARY SEWER UNDER EXISTING STORM SEWER,(EXCLUDING LF 40 $60.40 $2,416.00 PIPE),COMPLETE IN PLACE $49.75 $1,990.00 $66.30 $2,652.00 6.STANDARD SANITARY SEWER MANHOLE FOR 6"-24"SANITARY SEWER PIPES, EA .9 $345.00 $3,105.00 $1,206.25 $10,858.25 $1,891.00 $17,019.00 (8'DEPTH),COMPLETE IN PLACE 7.EXTRA DEPTH OF STANDARD SANITARY SEWER MANHOLE,(OVER 8'DEPTH), VF 29.8 $35.00 $1,043.00 $75.00 $2,235.00 $64.10 $1,910.18 COMPLETE IN PLACE 8.TRENCH SAFETY SYSTEM,ALL DEPTHS,COMPLETE IN PLACE LF 2492 . $2.00 $4,984.00 $2.50 $6,230.00 9.CONTRACTOR SHALL REMOVE EXISTING 15"SANITARY SEWER PLUG AND EA 1 $0.30 $ 00 0 CONSTRUCT PROPOSED SANITARY SEWER,COMPLETE IN PLACE 'S �8•� $406.25 $406.25 $267.00 $22667.07. 10.CONTRACTOR SHALL PLUG PROPOSED MANHOLE#S-104 FL(S)18"SANITARY EA 1 .$95.00 $95.00 $312.50 • SEWER FOR FUTURE CONNECTION,COMPLETE IN PLACE $312.50 $171.00 $171.00 11,EXCAVATION,HAUL AND COMPACTION OF UTILITY SPOIL FOR FILL OF EXISTING CY 830 $2.30 $1,909.00 DITCH,COMPLETE IN PLACE $3.65 $3,029.b0 $3.20 $2,g5g pp SUBTOTAL SANITARY SEWER ITEMS $79,974.20 S117.80260 8110.948,3E DRAINAGE FACMIES HEMS 1.EXCAVATION,HAUL COMPACT AND HYDROMULCH SEEDING OF OUTFALL LF 410 . $6.90 $2 829 00 DITCH,COMPLETE IN PLACE $7.40 $3,034.00 $20.85 $8,548.50 '2.4'THICK CONCRETE SLOPE PAVING,COMPLETE IN PLACE SY 38 $68.90 $2,618.20 3.REMOVE AND DISPOSE OF EXISTING 10'X T CONCRETE BOX CULVERT, LF 100 $52.50 $5,250.08 $101.50. 0, 50.00 COMPLETE IN PLACE $87.80 $8,780.00 $52.50 b5250.00 $10,150.00 4.TYPE'C"MANHOLE TOP FOR BOX CULVERT,COMPLETE IN PLACE EA 1 $2,730.00 $2,730.00 • $21,788.75 $21,788.75 $3,204.00 $3,204.00 5 of 13 O:WVl0111281112000001WW LAM WSI)BTffi BID TABULATION FOR: CONSTRUCTION OF WATER,SANITARY SEWER AND DRAINAGE FACILITIES , TO SERVE WATER LIGHTS • CITY OF PEARLAND BRAZORIA COUNTY,TEXAS BID OPENING DATE: DECEMBER 9,2008 • BID OPENING LOCATION: LJA ENGINEERING&SURVEYING INC. TABULATION BY: T.DELEON TABULATION DATE: DECEMBER 10,2008 LJA JOB NO. 1129-0003(9.2) 4)JOEL A TRIMM CONST.CO.,INC. 5)SLC CONSTRUCTION,LP. 8)CLEARWATER UTILITIES,INC. • ITEM DESCRIPTION UNIT an UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST • 5.EXCAVATION,HAUL AND COMPACTION OF UTILITY SPOIL FOR FILL OF EXISTING CY 970 $2.30 $2,231.00 $3.65 $3,540.50 $5.35 $5,189.50 DITCH,COMPLETE IN PLACE 6.10'X T PRECAST REINFORCED CONCRETE BOX CULVERT(ASTM C-1433),ALL LF 240 $500.00 $120,000.00 $571.51 $137,162.40 $488.90 $112,536.00 CUTS,INCLUDING BEDDING,COMPLETE IN PLACE 7.TRENCH SAFETY SYSTEMS.ALL DEPTHS,COMPLETE IN PLACE LF 240 $2.00 $480.00 $2.50 $600.00 $1.10 $284.00 8.STORM WATER POLLUTION PREVENTION PLAN COMPLIANCE,INCLUDING LS 1 $2,120.00 $2,120.00 $3,750.00 $3,750.00 $534.00 $534.00 MAINTAINING EXISTING FILTER FABRIC FENCE AND STABILIZED CONSTRUCTION EXIT,COMPLETE IN PLACE SUBTOTAL DRAINAGE FACILITIES ITEMS $141,76620 $178,133.73 $144,079.70 CLEARING AND GRUBBINOITEMS 1.CLEARING AND GRUBBING,COMPLETE IN PLACE AC 3.39 $5,300.00 $17,967.00 $5,000.00 $16,950.00 $13,241.00 $44,886.99 SUBTOTAL CLEARING AND GRUBBING ITEMS $17,967.00 $16,860.00 $44,888.99 • ADSCELLANEOUSITEMS 1.STABILIZED CONSTRUCTION EXIT AT LOCATION SHOWN ON PLANS(TO BE EA 1 $1,260.00 $1,260.00 $1,200.00 $1,200.00 $1,200.00 $1,200.00 USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE 2.HYDROMULCH SEEDING AND FINE GRADING,(TO BE USED ONLY AT THE AC 1 $1,365.00 $1,385.00 $1,000.00 $1,000.00 $1,450.00 WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE $1,450.00 3.BROADCAST SEEDING,FERTILIZING,AND WATERING(TO BE USED ONLY AT AC 1 $970.00 $970.00 $600.00 $600.00 $650.00 THE WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE $650.00 4.COFFER DAM FOR INSTALLATION OF 1-10'X T BOX,(TO BE USED ONLY AT THE EA 1 $5,250.00 $5,250.00 $2,812.50 $2,812.50. WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE $8,545.00 $8,545.00 5.REINFORCED FILTER FABRIC FENCE(SILT BARRIER FENCING),(TO BE USED LF 2670 $1.15 $3,070.50 $1.50 $4,005.00 ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE $1.10 $2,937.00 6.8"PORTABLE PUMP FOR REMOVAL OF WATER,COMPLETE IN PLACE HRS 500 $52.50 $28,250.00 $37.50 $18,750.00 7.12'PORTABLE PUMP FOR REMOVAL OF WATER,COMPLETE IN PLACE HRS 500 $48.05 $17,100.000 8.ADDITIONAL COST FOR STORM SEWER BEDDING AND BACKFILL FOR $52.500 E$6,000.00. $50.00 $25,000.00 $40.00 E$9,600.00 UNSATISFACTORY SOIL CONDITIONS(TO BE USED ONLY AS DIRECTED BY THE LF 240 $25.00 $6,000.00 $0.13 $31.20 $40.00 E9,600 OD ENGINEER),COMPLETE IN PLACE 9.ADDITIONAL COST FOR SANITARY SEWER BEDDING AND BACKFILL FOR LF 700 $15.00 $10,500.00 $0.13 UNSATISFACTORY SOIL CONDITIONS(TO BE USED ONLY AS DIRECTED BY THE $91.00 $20.00 $14,000.00 ENGINEER),COMPLETE IN PLACE 10.DEWATERING,(TO BE USED ONLY AS DIRECTED BY THE ENGINEER), LF 700 $22.00 $15,400.00 $1.25 $875.00 $25.00 $17,500.00 COMPLETE IN PLACE 11.RESTRAINED JOINT SECTION FOR 12'WATER LINE,(EITHER DUCTILE IRON OR LF. 100 $191.00 $19,100.00 • STEEL PIPE WITH MECHANICAL OR WELDED JOINTS),COMPLETE IN PLACE $64.85 $6,485.00 $85.50 $8,550.00 12.RESTRAINED JOINT SECTION FOR 16'WATER LINE,(EITHER DUCTILE IRON OR LF 100 $220.00 $22 000 00 STEEL PIPE WITH MECHANICAL OR WELDED JOINT),COMPLETE IN PLACE $118.10 $11,810.00 $104.40 $10,440.00 13.TEMPORARY BRACING OF POWER POLE BY CENTERPOINT,COMPLETE IN EA 4 51,485.00 $5,940.00 PLACE $1,875.00 $7,500.00 $1,602.00 $6,408.00 SUBTOTAL MISCELLANEOUS ITEMS • S143,365.50 $80,169.70 S122405.00 ALTERNATE BID ITEMS 1.20-STEEL CASING,INCLUDING 12"PVC WATER PIPE,C-900,DR 18,ALL DEPTHS LF 155 $400 00 E82 00p AND ALL FITTINGS,(IN LIEU OF WATER ITEM NO.12),12"STEEL WATER LINE, $268.75 $41,858.25 $115.90 $17,984.50 COMPLETE IN PLACE SUBTOTAL ALTERNATE BID ITEMS $62,000.00 f41,666,26 817,984.60 • 80113 owwamm112am¢nWeu,ULM WSD BT.,r BID TABULATION FOR: CONSTRUCTION OF WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS BID OPENING DATE: DECEMBER 9,2008 BID OPENING LOCATION: UA ENGINEERING&SURVEYING INC. TABULATION BY: T.DELEON TABULATION DATE: DECEMBER 10,2008 LJA JOB NO. 1129-0003(9.2) 4)JOEL A TRIMM CONST.CO.,INC. 5)SLC CONSTRUCTION,L.P. 6)CLEARWATER UTILITIES,INC. ITEM,DESCRIPTION UNIT QTY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST BID SUMMARY SUBTOTAL WATER ITEMS $175,132.80 $170,426.27 3146,307.35 SUBTOTAL SANITARY SEWER ITEMS $79,97420 $117,802.50 $110,948.38 SUBTOTAL DRAINAGE FACILITIES ITEMS $141,78820 $178,133.73 $144,079.70 SUBTOTAL CLEARING AND GRUBBING ITEMS $17,967.00 $18,950.00 $44,886.99 SUBTOTAL MISCELLANEOUS ITEMS $143,355.50 $80,159.70 $122,405.00 TOTAL AMOUNT BID 5666,217.70 5663,47220 S566,627A2 SUBTOTAL ALTERNATE BID ITEMS - $62,000.00 $41,656.25 S17,964.550 TOTAL AMOUNT BID W/ALTERNATE $583.947.70 • 3684,839.00 • 5668,271A2 • 7of13 ¢uaa1mm11xa:021tWr.r Lqe.Wu,er e. BID TABULATION FOR: CONSTRUCTION OF WATER.SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS BID OPENING DATE: DECEMBER 9,2008 BID OPENING LOCATION: UA ENGINEERING 8 SURVEYING INC. TABULATION BY: T.DELEON TABULATION DATE: DECEMBER 10,2008 LJAJOB NO. 1129-0003(9.2) 7)TRIPLE B SERVICES,LLP 8)BIG STATE EXCAVATION,INC. 9)CRAVENS PARTNERS,LTD. ITEM DESCRIPTION UNIT OTY . UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST WATER ITEMS 1.12"PVC WATER PIPE,C-900,DR 18,ALL DEPTHS,TO INCLUDE BEDDING AND LF 1525 $28.00 $42,700.00 $27.30 $41,632.50 $27.00 $41,175.00 ALL FITTINGS,COMPLETE IN PLACE 2.16"PVC WATER PIPE,C-905,DR 18,ALL DEPTHS,TO INCLUDE BEDDING AND LF 1317 $39.00 $51,363.00 $38.30 $47,807.10 $42.00 $55,314.00 ALL FITTINGS,COMPLETE IN PLACE 3.ARE HYDRANT UNIT,ALL DEPTHS,INCLUDES APPROPRIATE TEE,6"VALVE AND EA 9 $4,600.00 $41,400.00 $3,590.00 $32,310.00 $1,750.00 $15,750.00 BOX,6"LEAD AND FIRE HYDRANT,COMPLETE IN PLACE 4.16"AW WA BUTTERFLY VALVE AND BOX,COMPLETE IN PLACE EA 2 $4,000.00 $8,000.00 $3,100.00 $6,200.00 $4,500.00 $9,000.00 5.12"GATE VALVE AND BOX COMPLETE IN PLACE EA 6 $1,600.00 $9,600.00 $1,450.00 $8,700.00 $1,750.00 $10,500.00 6.REMOVE EXISTING 16"PLUG AND CLAMP AND 2"BLOW OFF VALVE AND BOX EA 1 $550.00 $550.00 $500.00 $500.00 5500.00 $500.00 AND CONNECT PROPOSED 16'WATER LINE,INCLUDES ALL NECESSARY ADAPTERS AND CONNECTORS,COMPLETE IN PLACE 7.TRENCH SAFETY SYSTEM,ALL DEPTHS,COMPLETE IN PLACE LF 2859 $1.00 $2,859.00 $0.05 $142.95 $0.10 $285.90 8.2"BLOW OFF VALVE AND BOX,INCLUDES ANY NECESSARY ADAPTERS AND EA 4 $900.00 $3,600.00 5590.00 $2,360.00 $250.00 51,000.00 CONNECTORS,COMPLETE IN PLACE 9,17'WELDED STEEL WATER LINE,INCLUDING COATINGS,BENDS,ELECTRICAL LF 155 $130.00 $20,150.00 $164.00 $25,420.00 5129.00 $19,995.00 INSULATION KITS,ADAPTERS,ETC.,COMPLETE IN PLACE 10.BORE FOR 16"WATER LINE(DOES NOT INCLUDE PIPE),COMPLETE IN PLACE LF 58 $65.00 $3,770.00 • $107.00 $6,206.00 $68.00 $3,828.00 11.BORE FOR 12'WATER LINE(DOES NOT INCLUDE PIPE),COMPLETE IN PLACE LF 80 $50.00 $4,000.00 $90.00 $7,200.00 $49.00 $3,920.00 12 EXCAVATION,HAUL AND COMPACTION OF UTILITY SPOIL FOR FILL OF EXISTING CY 870 $2.00 $1,740.00 $3.90 $3,393.00 $2.85 $2,479.50 DITCH,COMPLETE IN PLACE SUBTOTAL WATER ITEMS $189,732.00 8181,E71.88 $163,747A0 SANITARY SEWER ITEMS 1.12"PVC SEWER PIPE,ASTM D-2241,SDR 26,0'-8'CUT,TO INCLUDE BEDDING, LF 400 $24.00 $9,600.00 $110.00 $44,000.00 $22.50 $9,000.00 COMPLETE IN PLACE 2.15"PVC SEWER PIPE,ASTM D3034,SDR 26,0'-8'CUT,TO INCLUDE BEDDING, IF• 800. $40.00 $32,000.00 $27.60 $22,080.00 $28.00 $22,400.00 COMPLETE IN PLACE 3.15"PVC SEWER PIPE,ASTM D3034,SDR 26,8'-10'CUT,TO INCLUDE BEDDING, IF 1272 $43.00 $54,696.00 $29.20 $37,142.40 $30.00 S38,160.00 COMPLETE IN PLACE • 4.18'PVC SEWER PIPE,PS 46,F 679.0'-8'CUT,TO INCLUDE BEDDING, LF 20 $55.00 51,100.00 $52.30 $1,046.00 $84.00 $1,680.00 COMPLETE IN PLACE 5,BORE 15"SANITARY SEWER UNDER EXISTING STORM SEWER,(EXCLUDING IF 40 $125.00 35,000.00 $174.00 $6,960.00 $90.00 $3,600.00 . PIPE),COMPLETE IN PLACE 6.STANDARD SANITARY SEWER MANHOLE FOR S"-24'SANITARY SEWER PIPES, EA 9 $1,650.00 $14,850.00 $1,665.00 $14,985.00 51,300.00 $11,700.00 (8'DEPTH),COMPLETE IN PLACE 7.EXTRA DEPTH OF STANDARD SANITARY SEWER MANHOLE,(OVER 8'DEPTH), VF 29.8 $70.00 $2,086.00 $107.00 $3,188.60 $85.00 $2,533.00 COMPLETE IN PLACE 8.TRENCH SAFETY SYSTEM,ALL DEPTHS,COMPLETE IN PLACE LF 2492 $1.00 $2,492.00 $0.05 $124.60 $0.10 $249.20 9.CONTRACTOR SHALL REMOVE EXISTING 15"SANITARY SEWER PLUG AND EA 1 $125.00 $125.00 $100.00 $100.00 $500.00 $500.00 CONSTRUCT PROPOSED SANITARY SEWER,COMPLETE IN PLACE • 10.CONTRACTOR SHALL PLUG PROPOSED MANHOLE IAS-104 FL(S)18"SANITARY EA 1 $125.00 $125.00 $335.00 $335.00. $500.00 $500.00 SEWER FOR FUTURE CONNECTION,COMPLETE IN PLACE • 11.EXCAVATION,HAUL AND COMPACTION OF UTILITY SPOIL FOR FILL OF EXISTING CY 830 $2.00 51,660.00 $3.90 $3,237.00 $2.85 $2,365.50 DITCH,COMPLETE IN PLACE SUBTOTAL SANITARY SEWER ITEMS $123,734.00 $133,198.60 $8$687.70 DRAINAGE FACILITIES REVS 1.EXCAVATION,HAUL,COMPACT AND HYDROMULCH SEEDING OF OUTFALL LF 410 $15.00 $6,150.00 $6.90 $2,829.00 - $43.50 $17,835.00 DITCH,COMPLETE IN PLACE 2 4'THICK CONCRETE SLOPE PAVING.COMPLETE IN PLACE SY 38 $90.00 $3,420.00 $56.00 52,128.00 $95.00 $3,610.00 3.REMOVE AND DISPOSE OF EXISTING 10'X T CONCRETE BOX CULVERT, IF 100 $175.00 $17,500.00 $22.00 $2,200.00 $89.50 $8,950.00 COMPLETE IN PLACE 4.TYPE"C"MANHOLE TOP FOR BOX CULVERT,COMPLETE IN PLACE EA 1 $2,000.00 32,000.00 $18,500.00 $18,500.00 $17,500.00 $17,500.00 8 of 13 MUNICA11a11maomlwr Lights Ws0-et.r. • BID TABULATION FOR: CONSTRUCTION OF WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS BID OPENING DATE: DECEMBER 9;2008 BID OPENING LOCATION: LJA ENGINEERING 8 SURVEYING INC. TABULATION BY: T.DELEON TABULATION DATE: DECEMBER 10,2008 • LTA JOB NO. 1129-0003(92) 7)TRIPLE B SERVICES,LIP 8)BIG STATE EXCAVATION,INC. 9)CRAVENS PARTNERS,LTD. ITEM DESCRIPTION UNIT OTY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST 5.EXCAVATION.HAUL AND COMPACTION OF UTILITY SPOIL FOR FILL OF EXISTING Cy 970 $2.00 $1,940.00 $3.90 $3,783.00 E2.85 $2,764 50 DITCH,COMPLETE IN PLACE 6.10'X T PRECAST REINFORCED CONCRETE BOX CULVERT(ASTM C-1433),ALL LF 240 $700.00 $188,000.00 CUTS,INCLUDING BEDDING,COMPLETE IN PLACE 5530.00 5127,200.00 E805.00 E745,200.00 7.TRENCH SAFETY SYSTEMS,ALL DEPTHS,COMPLETE IN PLACE LF 240 $1.00 $240.00 $0.05 $12.00 $0.10 8.STORM WATER POLLUTION PREVENTION PLAN COMPLIANCE,INCLUDING LS 1 $300 00 3300.00 000.00 MAINTAINING EXISTING FILTER FABRIC FENCE AND STABILIZED 5120.00 a120.00 E1,000.00 $1,OOD.00 CONSTRUCTION EXIT,COMPLETE IN PLACE SUBTOTAL DRAINAGE FACILITIES ITEMS $198,860 00 $156,772.00 $190,883.80 CLEARING AND GRUBBING ITEMS 1.CLEARING AND GRUBBING,COMPLETE IN PLACE AC 3.39 34.200.00 $14,238.00 $5,600.00 E18,984.00 $2,000.00 $6,780.00 SUBTOTAL CLEARING AND GRUBBING ITEMS 614,238.00 $18,984.00 $6.780.00 MISCELLANEOUS ITEMS • • 1.STABILIZED CONSTRUCTION EXIT AT LOCATION SHOWN ON PLANS(TO BE EA 1 $1,200.00 $1,200.00 $1,200.00 $1,200.00 $1.200.00 $1.200.00 USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE • 2.HYDROMULCH SEEDING AND FINE GRADING,(TO BE USED ONLYAT THE AC 1 $1,000.00 - $1 WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE 000 00 E1,000.00 $1,000.00 $7,200.00 a1,200.00 3.BROADCAST SEEDING.FERTILIZING.AND WATERING(TO BE USED ONLY AT AC 1 $500.00 THE WRITTEN DIRECTION OF THE ENGINEER).COMPLETE IN PLACE $600.00 $600.00 $600.00 $600.00 E600.00 4.COFFER DAM FOR INSTALLATION OF 1-10'X T BOX,(TO BE USED ONLY AT THE EA 1 $10,000.00 $10,000.00 $39,175.00 $39,175.00 $65,000.00 $65,000.00 WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE 5.REINFORCED FILTER FABRIC FENCE(SILT BARRIER FENCING),(TO BE USED LF 2870 $1.10 ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE $2,937.00 $1.20 $3,204.00 $1.15 $3,070.50 6.8"PORTABLE PUMP FOR REMOVAL OF WATER,COMPLETE IN PLACE HRS 500 $1.00 7.12"PORTABLE PUMP FOR REMOVAL OF WATER,COMPLETE IN PLACE HRS 500 $500.00 $0.01 $5.00 $50.005.00 325,000.00 $1.00 $500.00 $0.01 20.00 23,600.00 $ 8.ADDITIONAL COST FOR STORM SEWER BEDDING AND BACKFILL FOR LF UNSATISFACTORY SOIL CONDITIONS(TO BE USED ONLY AS DIRECTED BY THEITI 240 $1.00 $240.00 328.00 $6,720.00 $15.00 ENGINEER),COMPLETE IN PLACE $3,600.00 9.ADDITIONAL COST FOR SANITARY SEWER BEDDING AND BACKFILL FOR IF 700 $1.00 UNSATISFACTORY SOIL CONDITIONS(TO BE USED ONLY AS DIRECTED BY THE $700.00 $10.00 $7,000.00 $8.00 $5,600.00 ENGINEER).COMPLETE IN PLACE 10.DEWATERING,(TO BE USED ONLY AS DIRECTED BY THE ENGINEER), LF 700 COMPLETE IN PLACE $25.00 $17,500.00 $20.00 $74,000.00 $18.00 $12,600.00 11.RESTRAINED JOINT SECTION FOR 12"WATER LINE,(EITHER DUCTILE IRON OR LF 100 • STEEL PIPE WITH MECHANICAL OR WELDED JOINTS),COMPLETE IN PLACE $35.00 $3,500.00 $133.00 $13,300.00 $61.00 $6,100.00 12.RESTRAINED JOINT SECTION FOR 16"WATER LINE,(EITHER DUCTILE IRON OR LF 100 .STEEL PIPE WITH MECHANICAL OR WELDED JOINT),COMPLETE IN PLACE S45'� $4,500.00 $159.00 $15,900.00 $84.00 $8,400.00 13.TEMPORARY BRACING OF POWER POLE BY CENTERPOINT,COMPLETE IN EA 4 PLACE $750.00 $3,000.00 $1,200.00 $4,800.00 $500.00 $2,000,00 SUBTOTAL MISCELLANEOUS ITEMS ALTERNATE BID HEMS ,1n'00 8108,909.00 $181A70.80 1.20"STEEL CASING,INCLUDING 12"PVC WATER PIPE,C-900,DR 18,ALL DEPTHS IF 155 AND ALL FITTINGS,(IN LIEU OF WATER ITEM NO.12),12"STEEL WATER LINE, $100.00 $15,500.00 $175.00 $27,125.00 $95.00 $14,725.00 COMPLETE IN PLACE SUBTOTAL ALTERNATE BID ITEMS $15,500.00 $27,128.00 614,725.00 90113 o ANIA11amaa0131W.iruy,tiWB0-BT,r BID TABULATION FOR: CONSTRUCTION OF WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS BID OPENING DATE: DECEMBER 9,2008 BID OPENING LOCATION: LJA ENGINEERING 8 SURVEYING INC. TABULATION BY: T.DELEON TABULATION DATE DECEMBER 10,2008 LJA JOB NO. 1129-0003(92) 7)TRIPLE B SERVICES,LLP 8)BIG STATE EXCAVATION,INC. 9)CRAVENS PARTNERS,LTD. • ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST •UNIT COST TOTAL COST UNIT COST TOTAL COST BID SUMMARY SUBTOTAL WATER ITEMS $189,732.00 $181,871.55 $163,747.40 SUBTOTAL SANITARY SEWER ITEMS $123,734.00 $133,198.60 $92,687.70 SUBTOTAL DRAINAGE FACILITIES ITEMS E199,550.00 E156,772.00 $196,883.50 SUBTOTAL CLEARING AND GRUBBING ITEMS $14,238.00 $18,984.00 $6,780.00 SUBTOTAL MISCELLANEOUS ITEMS $46,177.00 $106,909.00 $151,870.50 TOTAL AMOUNT BID SW3.431.00 3697,736.16 3611,969.10 SUBTOTAL ALTERNATE BID ITEMS $15,500.00 $27,125.00 $14,725.00 TOTAL AMOUNT BID W/ALTERNATE $588,761.00 • $599,440.16 • $608,899.10 • • 10 of 13 ¢wwallm»saoanwar WY.WSo IST.m BID TABULATION FOR: CONSTRUCTION OF WATER.SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND • BRAZORIA COUNTY,TEXAS BID OPENING DATE: DECEMBER 9,2008 BID OPENING LOCATION: UA ENGINEERING&SURVEYING INC. TABULATION BY: T.DELEON TABULATION DATE: DECEMBER 10,2008 LJA JOB NO. 1129.0003(92) 10)UNCO CONSTRUCTION CO.,INC. 11)MDA,INC. ITEM DESCRIPTION UNIT CITY UNIT COST TOTAL COST UNIT COST TOTAL COST WATER ITEMS • 1.12"PVC WATER PIPE,C-900,DR 18,ALL DEPTHS,TO INCLUDE BEDDING AND LF 1525 $26.70 .$40,717.50 $40.00 $61.000.00 ALL FITTINGS,COMPLETE IN PLACE 2.16"PVC WATER PIPE,C-905,DR 18,ALL DEPTHS,TO INCLUDE BEDDING AND LF 1317 $37.30 $49,124.10 $50.00 $65,850.00 ALL FITTINGS,COMPLETE IN PLACE ' 3..FIRE HYDRANT UNIT,ALL DEPTHS,INCLUDES APPROPRIATE TEE,6"VALVE AND EA 9 $3,225.00 $29,025.00 $2,000.00 $18,000.00 BOX,6"LEAD AND FIRE HYDRANT,COMPLETE IN PLACE 4.16"AW WA BUTTERFLY VALVE AND BOX,COMPLETE IN PLACE EA 2 $3,335.00 $6,670.00 $4,000.00 $8,600.00 5.12"GATE VALVE AND BOX,COMPLETE IN PLACE EA 8 51,755.00 $10,530.00 $1,500.00 $9,000.00 6.REMOVE EXISTING 16"PLUG AND CLAMP AND 2"BLOW OFF VALVE AND BOX EA 1 $1,000.00 $1,000.00 $2,000.00 $2,000.00 AND CONNECT PROPOSED 16"WATER LINE,INCLUDES ALL NECESSARY ADAPTERS AND CONNECTORS,COMPLETE IN PLACE 7.TRENCH SAFETY SYSTEM,ALL DEPTHS,COMPLETE IN PLACE LF 2859 $1.40 $4,002.60 $1.00 $2,859.00 8.2"BLOW OFF VALVE AND BOX,INCLUDES ANY NECESSARY ADAPTERS AND EA 4 $1,295.00 $5,180.00 $500.00 $2,000.00 CONNECTORS,COMPLETE IN PLACE 9.12"WELDED STEEL WATER LINE,INCLUDING COATINGS,BENDS,ELECTRICAL LF 155 $167.00 $25,885.00 $85.00 $13,175.00 INSULATION KITS,ADAPTERS,ETC.,COMPLETE IN PLACE 10.BORE FOR 16"WATER LINE(DOES NOT INCLUDE PIPE),COMPLETE IN PLACE LF 58 $154.00 58,932.00 $60.00 $3,480.00 11.BORE FOR 12"WATER LINE(DOES NOT INCLUDE PIPE),COMPLETE IN PLACE LF 80 8111.00 $8,880.00 $50.00 $4,000.00 12.EXCAVATION,HAUL AND COMPACTION OF UTILITY SPOIL FOR FILL OF EXISTING CY 870 $10.50 $9,135.00 $2.00 51,740.00 DITCH,COMPLETE IN PLACE SUBTOTAL WATER ITEMS S199.081.20 $191,104.00 • SANITARY SEWER ITEMS 1.12"PVC SEWER PIPE,ASTM D-2241,SDR 26,0'-8'CUT,TO INCLUDE BEDDING, IF 400 $29.60 $11,840.00 $30.00 $12,000.00 COMPLETE IN PLACE 2.15"PVC SEWER PIPE,ASTM D3034,SDR 26,0'-8 CUT.TO INCLUDE BEDDING, LF 800 $35.10 $28,080.00 $35.00 $28,000.00 COMPLETE IN PLACE 3.15"PVC SEWER PIPE.ASTM D-3034,SDR 26,8'-10'CUT,TO INCLUDE BEDDING, IF 1272 $38.40 $48,300.80 $38.00 $48,338.00 COMPLETE IN PLACE 4.18"PVC SEWER PIPE,PS 46,F 679,0'-8'CUT,TO INCLUDE BEDDING, IF 20 $46.10 $922.00 $43.00 $860.00 COMPLETE IN PLACE 5.BORE 15"SANITARY SEWER UNDER EXISTING STORM SEWER,(EXCLUDING LF 40 $160.00 $8,400.00 $75.00 $3,000.00 PIPE).COMPLETE IN PLACE 6.STANDARD SANITARY SEWER MANHOLE FOR 6°-24°SANITARY SEWER PIPES, EA . 9 $2,425.00 $21,825.00 $2,000.00 $18,000.00 (8'DEPTH),COMPLETE IN PLACE 7.EXTRA DEPTH OF STANDARD SANITARY SEWER MANHOLE,(OVER 8'DEPTH), VF 29.8 $93.00 $2,771.40 $100.00 $2,980.00 COMPLETE IN PLACE 8.TRENCH SAFETY SYSTEM,ALL DEPTHS,COMPLETE IN PLACE LF 2492 $2.80 $8,977.60 $1.00 $2,492.00 9.CONTRACTOR SHALL REMOVE EXISTING 15"SANITARY SEWER PLUG AND EA 1 $700.00 $700.00 $1,000.00 $1,000.00 CONSTRUCT PROPOSED SANITARY SEWER,COMPLETE IN PLACE 10.CONTRACTOR SHALL PLUG PROPOSED MANHOLE#S-104 FL(S)18"-SANITARY EA 1 $700.00 $700.00 $1,000.00 $1,000.00 SEWER FOR FUTURE CONNECTION,COMPLETE IN PLACE 11,EXCAVATION,HAUL AND COMPACTION OF UTILITY SPOIL FOR FILL OF EXISTING CY 830 $10.50 $8,715.00 $2.00 51,660.00 DITCH,COMPLETE IN PLACE SUBTOTAL SANITARY SEWER ITEMS $135,231.50 i119,$28.00 DRAINAGE FACILITIES ITEMS 1.EXCAVATION,HAUL,COMPACT AND HYDROMULCH SEEDING OF OUTFALL IF 410 $9.00 $3,690.00 $15.00 $6,150.00 DITCH,COMPLETE IN PLACE 2.4"THICK CONCRETE SLOPE PAVING,COMPLETE IN PLACE SY 38 $65.00 82,470.00 $85.00 $3,230.00 3.REMOVE AND DISPOSE OF EXISTING 10'X T CONCRETE BOX CULVERT, LF 100 $89.60 $8,960.00 $30.00 $3,000.00 COMPLETE IN PLACE 4.TYPE"C"MANHOLE TOP FOR BOX CULVERT,COMPLETE IN PLACE EA 1 $2,185.00 $2,165.00 $5,000.00 $5,000.00 • 11 of 13 o-wNal1aSnmamiwWr uyu.WSO BTsY BID TABULATION FOR: CONSTRUCTION OF WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS BID OPENING DATE: DECEMBER 9,2008 BID OPENING LOCATION: LJA ENGINEERING 8 SURVEYING INC. TABULATION BY: T.DELEON TABULATION DATE: DECEMBER 10,2008 LJAJOB NO. 1129-0003(92) 10)LINCO CONSTRUCTION CO.,INC. 11)MDA,INC. ITEM DESCRIPTION UNIT CITY UNIT COST TOTAL COST UNIT COST . TOTAL COST 5.EXCAVATION,HAUL AND COMPACTION OF UTILITY SPOIL FOR FILL OF EXISTING Cy 970 $10.50 $10,185.00 $2.00 $1,940.00 DITCH,COMPLETE IN PLACE 6.10'XT PRECAST REINFORCED CONCRETE BOX CULVERT(ASTM C-1433),ALL LF 240 $500.00 $120,000.00 $750.00 $180,000.00 CUTS,INCLUDING BEDDING,COMPLETE IN PLACE . 7.TRENCH SAFETY SYSTEMS,ALL DEPTHS,COMPLETE IN PLACE LF 240 $22.00 $5,280.00 $1.00 $240.00 8.STORM WATER POLLUTION PREVENTION PLAN COMPLIANCE,INCLUDING LS 1 $3,000.00 $3,000.00 $2,000.00 $2,000.00 MAINTAINING EXISTING FILTER FABRIC FENCE AND STABILIZED CONSTRUCTION EXIT,COMPLETE IN PLACE • SUBTOTAL DRAINAGE FACILITIES ITEMS $166,750.00 $201,680.00 CLEARING AND GRUBBING ITEMS 1.CLEARING AND GRUBBING,COMPLETE IN PLACE AC 3.39 $8,745.00 $29,645.55 $5,000.00 $16,950.00 SUBTOTAL CLEARING AND GRUBBING ITEMS $29,645.66 $16,950.00 MISCELLANEOUS ITEMS 1.STABILIZED CONSTRUCTION EXIT AT LOCATION SHOWN ON PLANS(TO BE EA 1 $1,400.00 $1,400.00 81,200.00 $1,200.00 USED ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE 2.HYDROMULCH SEEDING AND FINE GRADING,(TO BE USED ONLY AT THE AC 1 $1,500.00 $1,500.00 $1,000.00 $1,000.00 WRITTEN DIRECTION OF THE ENGINEER).COMPLETE IN PLACE 3.BROADCAST SEEDING,FERTILIZING,AND WATERING(TO BE USED ONLY AT AC 1 $600.00 $600.00 $600.00 $600.00 THE WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE 4.COFFER DAM FOR INSTALLATION OF 1-10'X T BOX,(TO BE USED ONLY AT THE EA 1 $1,500.00 $1,500.00 $10,000.00 $10,000.00 WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE 5.REINFORCED FILTER FABRIC FENCE(SILT BARRIER FENCING),(TO BE USED LF 2670 $1.70 $4,539.00 $1.00 $2,670.00 ONLY AT THE WRITTEN DIRECTION OF THE ENGINEER),COMPLETE IN PLACE 6.8"PORTABLE PUMP FOR REMOVAL OF WATER,COMPLETE IN PLACE HRS 500 $26.00 $13,000.00 $60.00 $30,000.00 7.12"PORTABLE PUMP FOR REMOVAL OF WATER,COMPLETE IN PLACE HRS 500 $32.60 $18,300.00 $75.00 $37,500.00 8.ADDITIONAL COST FOR STORM SEWER BEDDING AND BACKFILL FOR LF 240 $77.50 $18,800.00 $20.00 $4,800.00 UNSATISFACTORY SOIL CONDITIONS(TO BE USED ONLY AS DIRECTED BY THE ENGINEER),COMPLETE IN PLACE 9.ADDITIONAL COST FOR SANITARY SEWER BEDDING AND BACKFILL FOR LF 700 $12.20 $8,540.00 $20.00 $14,000.00 UNSATISFACTORY SOIL CONDITIONS(TO BE USED ONLY AS DIRECTED BY THE ENGINEER),COMPLETE IN PLACE 10.DEWATERING,(TO BE USED ONLY AS DIRECTED BY THE ENGINEER), LF 700 $28.00 $19,600.00 $20.00 514,000.00 COMPLETE IN PLACE . 11.RESTRAINED JOINT SECTION FOR 12"WATER LINE,(EITHER DUCTILE IRON OR •IF 100 $73.40 $7,340.00 $75.00 $7,500.00 STEEL PIPE WITH MECHANICAL OR WELDED JOINTS),COMPLETE IN PLACE 12.RESTRAINED JOINT SECTION FOR 16"WATER LINE,(EITHER DUCTILE IRON OR IF 100 $85.70 $8,570.00 $85.00 $8,500.00 STEEL PIPE WITH MECHANICAL OR WELDED JOINT),COMPLETE IN PLACE 13.TEMPORARY BRACING OF POWER POLE BY CENTERPOINT,COMPLETE IN. EA 4 $1,500.00• $.6,000.00 $1,500.00 56,000.00 PLACE SUBTOTAL MISCELLANEOUS ITEMS $107,169.00 $1$7,770.00 ALTERNATEIND hEMS 1.20"STEEL CASING,INCLUDING 12"PVC WATER PIPE,C-900,DR 18,ALL DEPTHS LF 155 $88.00 $13,640.00 $100.00 $15,500.00 'AND ALL FITTINGS,(IN LIEU OF WATER ITEM NO.12),12"STEEL WATER LINE, COMPLETE IN PLACE SUBTOTAL ALTERNATE BID ITEMS $17,640,00 $16 600.00 12 0113 owwrn112A+12SCCO Na r upe.MI:LI i& 14 BID TABULATION FOR: CONSTRUCTION OF WATER,SANITARY SEWER AND DRAINAGE FACILRIES TO SERVE WATER LIGHTS , CITY OF PEARLAND BRAZORIA COUNTY,TEXAS BID OPENING DATE: DECEMBER 9,2008 BID OPENING LOCATION: LJA ENGINEERING 8 SURVEYING INC. TABULATION BY: T.DELEON TABULATION DATE: DECEMBER 10,2008 LJA JOB NO. 1129-0003(9.2) 10)LINCO CONSTRUCTION CO.,INC. 11)MDA,INC. REM DESCRIPTION • UNIT QTY ' UNIT COST TOTAL COST UNIT COST TOTAL COST BID SUMMARY SUBTOTAL WATER ITEMS $199,08120 $191,104.00 • SUBTOTAL SANITARY SEWER ITEMS $135231.80 $119,328.00 SUBTOTAL DRAINAGE FACILITIES ITEMS $155,750.00 $201,560.00 SUBTOTAL CLEARING AND GRUBBING ITEMS $29,845.55 $18,950.00 SUBTOTAL MISCELLANEOUS ITEMS $107,489.00 $137,770.00 TOTAL AMOUNT BID $627,197J.5 $666,T12.00 • SUBTOTAL ALTERNATE BID ITEMS $13,640.00 $15,500.00 .,, TOTAL AMOUNT BID W/ALTERNATE $814,962.66 • S668.037.00 • • 13 of 13 ouurrni1ma1maorcnw,r,LJ WSO STAY • LJA Engineering & Surveying, Inc. 111 2929 Briarpark Drive Phone 713.953.5200 Suite 600 Fax 713.953.5026 Houston,Texas 77042-3703 www.ljaengineering.com December 15, 2008 Ms. Tracy Elizabeth Goswick Boardwalk at the Spectrum, L.P. 14326 Highway 288 South Houston, Texas 77047 • Re: Recommendation of Award Construction of Water, Sanitary Sewer, and Drainage Facilities To Serve Water Lights City of Pearland Harris County, Texas LJA Job No. 1129-0003 (11.1) Dear Ms. Goswick On December 10, 2008, we received twelve (12) bids, at our office for the referenced project. After review of the bids submitted, we recommend the contract be awarded to the low bidder, Hurtado Construction Company, with a total bid amount of $420,095.90 including the Alternate Bid Items and 60/75 calendar days construction time. Enclosed for your review is a copy of the bid tabulation. Please call me at 713.953.5090 if you have any questions regarding the bid. Sincerely, /`"'mil eff y eLeon, P.E. Project anager JCD/tdd Enclosure Copy: Mr. Cullum J. Heard, Spectrum Management District(w/enclosure) Mr. Tommy Busceme, TCEQ (w/enclosure) Mr. Narciso Lira, III, P.E., City of Pearland (w/enclosure) Mr. Gregory Patch, P.E., LJA Engineering & Surveying, Inc. (w/enclosure) Mr. Curtis Villarreal, P.E., LJA Engineering & Surveying, Inc. (w/enclosure) O:\LAND\1129\1129-0003 RECAWARD.doc G►� CCITY OF PEARLAND BRAZORIA COUNTY,TEXAS 7 TABLE OF CONTENTS C NO. OF SECTION TITLE PAGES CDIVISION 0—BIDDING AND CONTRACT DOCUMENTS LJA Invitation to Bid 1 CLJA Instructions to Bidders 8 LJA Bid Proposal 16 7 00500 Standard Form of Agreement 7 00610 Performance Bond 2 00611 Payment Bond 2 C 00612 One-Year Maintenance Bond 2 00615 Partial Waiver of Lien 1 00700 General Conditions of Agreement 31 7 00800 Special Conditions of Agreement 1 00811 Wage Scale for Engineering Construction 2 LJA Staking Request Form 1 CLJA Hold Harmless Agreement 1 DIVISION 1—GENERAL REQUIREMENTS C01100 Summary of Work 2 01140 Contractor's Use of Premises 4 7 01200 Measurement and Payment Procedures 3 01290 Change Order Procedures 4 01310 Coordination and Meetings 3 7 01350 Submittals 6 01380 Construction Photographs 3 01420 Referenced Standards 5 E01430 Contractor's Quality Control 2 01440 Inspection Services 1 E. 01450 Testing Laboratory Services • 2 01500 Temporary Facilities and Controls 9 01505 Mobilization 1 7 01550 Stabilized Construction Exit 4 01555 Traffic Control and Regulation 4 01560 Filter Fabric Fence 3 7. 01561 Reinforced Filter Fabric Barrier 3 01562 Waste Material Disposal 3 01563 Tree and Plant Protection 4 c 01564 Control of Ground Water and Surface Water 8 01565 TPDES Requirements 3 01566 Source Controls for Erosion and Sedimentation 5 7 01570 Trench Safety System 4 00010- 1 of 2 rCITY OF PEARLAND TABLE OF CONTENTS 7 01580 Project Identification Signs 4 01600 Material and Equipment 3 01630 Product Options and Substitutions 3 7 01720 Field Surveying 2 01730 Cutting and Patching 3 01750 Starting Systems 2 7 01760 Project Record Documents 2 P- 01770 Contract Closeout 2 7 DIVISION 2—SITE WORK 02200 Site Preparation 4 . 7 02220 Site Demolition 5 02252 Cement Stabilized Sand 3 7 02255 Bedding, Backfill, and Embankment Materials 6 02316 Excavation and Backfill for Roadways 4 02317 Excavation and Backfill for Structures 7 7 02318 Excavation and Backfill for Utilities 12 02330 Embankment 5 02370 Geotextile 2 C 02415 Augering Pipe or Casing for Sewers 7 02417 Augering Pipe or Casing for Water Lines 6 02510 Water Mains 10 7 02512 Polyethylene Wrap 4 02514 Fire Hydrant Assembly 6 02520 Valve Boxes, Meter Boxes, and Meter Vaults 4 7 02530 Gravity Sanitary Sewers 20 02531 Sanitary Sewer Service Leads or Reconnections 6 02534 PVC Pipe 6 7 02540 Tapping Sleeves and Valves 3 02541 Water and Wastewater Line Valves 8 02542 Concrete Manholes and Accessories 10 7 02603 Frames, Grates, Rings, and Covers 3 02624 Structural Plate Culvert Structures 7 �.r 02630 Storm Sewers 10 L02631 Precast Inlets, Headwalls, and Wingwalls 4 02632 Cast-in-Place Inlets, Headwalls, and Wingwalls 3 7 02633 Adjusting Manholes, Inlets, and Valve Boxes 3 02634 Ductile Iron Pipe and Fittings 5 02921 Hydromulch Seeding 4 7 DIVISION 5 -METALS 7 Not Used END OF SECTION 7 00010-2 of 2 7 r ADDENDUM NO.4 CONSTRUCTION OF THE WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS December 5,2008 LJA JOB NO. 1129-0003 (9.4) r The following changes will be considered part of the Construction Plans, Bid Proposal and Contract EDocuments: 1.) Reference: Contract Documents—Bid Proposal Replace: Pages 8, 9 and 13 of 16 with revised Pages 8, 9 and 13 of 16, (attached). 2.) Reference: Construction Plans Add: Exhibit No. 1 and Exhibit No. 2, (attached). E Clarification: Box culvert bends to be constructed in lieu of manhole no. D-2 (see Exhibits 1 and 2 attached) There are no other changes or revisions to the Construction Plans, Bid Proposal and Contract Documents at this time. E E OF rg,411, �. .*tee ,s; e e JEFFREY C.DELEON J 0tt� O oe Page 1 of 1 ADDENDUM NO.4 O:\LAND\1129\1129-0003\BIDDOCS\ADDEN 4.doc r--, r—I 771 r7-I "—1 r� r7-11 r---I r `I r-J r—1 TA 771 r r— ..�._ _t r``-7 �'l xf14 N \ • I -----__Existing I Power Pole N D .. •�•••••••. II I,I I Ir,�II Existing ,• •4'`� ; Power Line e Future 10 Type "C"Inlets nlets M.H.#S l05. J. Neo (By Others)15"SAN.SWR. A •%.404 I I Existing Future 24"Stm.Swr. �� I I Power Pole (By Others) v 146 Existing Power Line ` —Existing Power Pole 505 INII‘ , o o 'o.52 :1 — _ _ S44%.�:►�r�rr�ri rExisting Tiii _l0'x 7'Box Culvert ` ,. �� 1,0:4000111 .- ---�--�-- ----- \Q*61 /.00 A!4, S_8T 3 'l3°W 7 �' �Li 4.00 lO x 7 � urai .�� .�_ BOX CULVERT M.H.# D-1 I =JJ "/'°� _ ' V I PROPO 10'x 7' ; FILL I < DITC BOX CULVERT EXISTING - ' I � ,t DITCH �ir<- _ ii o I6"WATER LINE ; I 1 I Future 10'x 7' �°1 ' 24' Stm.Swr. BOX CULVERT I I ° I 10'W.S.E. - - A I (ByOthers) Future 1O'Type "C"Inlets (By Others) ill _ 501 A + Lo cir,rnn 7-11 1 __-.1 `_`_--1-----1 7---1 'i—.-, `�. 11 �, �,�r ] r -- I 'C `1-----` 1 r`_`�- rT`l Existing i0'xT Box Culvert 0 �, j-� Sta.0.82.39 (67.78'Lt.) _ o Q Existing E 10'x7/(NW) = 36.04 — PROPOSED l0'x7'lSE) = 36.04 + ��\\�_ o 0 \ m� II � .71 BOX w/ M.H.TOP #D l \ o 0 STA.If44.09 (5.95'LT.) m RIM ELEVATION = 58.90 z Exist.E 10'x7'(NW) = 44.54 , y (TO BE RELOCATED) c N-. PROP.E 10'x7'(NE&W) = 36.08 sk , orn N k' CO ••9 cn 1 \ + f� 0 r �� l lA 00 0 ul op.o •!' a� 1 SAN.M.H.#S l04 ,� i 1 = C STA.2.43.43 (40.50'RT.) I ! L �� RIM ELEV = 58.10 L ' , ,,,,,, V 1 FL /5" 'E)= 46.97 I f /5" 'N) = 46.97 I I _ EL 18" 'S) = 46.97 / .� PROPOSED BOX BEND - j 1 CA SI A.2'8/..SS (Z.5U'LIT- — I � i \ v + S IOW'(NE&W) _ 36./57.__ _ tiiImer ' N_ tnp E 10'x7'(E) = 36.15 END 8'XT BOX I ' p CULVERT AND ! ni°' X BEGIN DITCH <.o I n PROPOSED BOX BEND �' ' o y m o STA.2-96.76 (2.50'LT.) C STA.2.56.76 1-, : I i o, L 7" E 10'x7'(NE&W) = 45.65 Pt = 45.65 0 i rrl rn • T IO'x7'(C) - 45.E END DITCH 1 o + C ST A.3-I6.00 '� E = 47.78 . I I A I �'� '� i co i. i IL �o P L + — row O . , 0 m� �� r 0 -0 CD-, rn m o��• � o \o I Oj1 1 1 EADDENDUM NO.3 CONSTRUCTION OF THE WATER, SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS E • December 5, 2008 LJA JOB NO. 1129-0003 (9.4) r The following changes will be considered part of the Construction Plans, Bid Proposal and Contract Documents: 1.) Reference: Contract Documents—Bid Proposal Replace: Page 4 of 16 with revised 4 of 16, (attached). There are no other changes or revisions to the Construction Plans, Bid Proposal and Contract Documents at this time. E *: . `.) p .°...°.° .,......°...°..° .... d0 f, JEFF EY C.DE LEON 5 . °°.... 303 ff E Page 1 of 1 ADDENDUM NO.3 O:\LAND\1129\1129-0003\BIDOOCS\ADDEN 3.doc E EADDENDUM NO.2 CONSTRUCTION OF THE WATER, SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS EDecember 3, 2008 LJA JOB NO. 1129-0003(9.4) The following changes will be considered part of the Construction Plans, Bid Proposal and Contract Documents: 1.) Reference: Contract Documents—Instruction to Bidders Replace: Page 6 of 8 with revised Page 6 of 8, (attached) 2.) Reference: Contract Documents—Bid Proposal E Replace: Pages 1 through 14 of 14 with revised Pages 1 through 16 of 16, (attached). p 9 9 9 9 ( ) 3.) Reference: Construction Plans Clarification: 1. There will be no proposed cast-in-place junction boxes with manholes or "A" inlet tops. All Proposed Storm Sewers will be precast boxes with manhole tops. 2. The Miscellaneous Items for pumping will be used only after written direction / approval of the Engineer. The lowing of the water surface of the detention pond is to be done with the coffer dam item with all pumping necessary. This will be incidental to the installation cost of the box culverts. There are no other changes or revisions to the Construction Plans, Bid Proposal and Contract Documents at this time. • OI`i N 4f %* p �.14vyJ t FFoR.�0 f C. .. 0 J� cSE�i 6-\9t 1 C.DE LE®IY °ar r -ataO �� 93II43®ret S /7/3.-o ea E Page 1 of 1 ADDENDUM NO.2 O:\LAND\1129\1129-0003\BIDDOCS\ADDEN 2.doc EADDENDUM NO. 1 CONSTRUCTION OF THE WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS L December 2,2008 LJA JOB NO. 1129-0003 (9.4) The following changes will be considered part of the Construction Plans, Bid Proposal and Contract [11 Documents: 1.) Reference: Contract Documents—Invitation to Bidders Replace: Page 1 of 1 with revised Page 1 of 1, (attached) EClarification: Change Bid Opening to 2:00 p.m., Tuesday, December 9, 2008. There are no other changes or revisions to the Construction Plans, Bid Proposal and Contract Documents Eat this time. E ................................................ CURTIS VILLARREAL P , H. ti :.....83424......:.�et 1•%.tho �/CENSEA•G� 7� t iONAL .w®*�" t . /It N� E /2A/DE Page 1 of 1 ADDENDUM NO. 1 O:\LAND\1129\1129-0003\BIDDOCS\ADDEN 1.doc INVITATION TO BIDDERS SEALED PROPOSALS addressed to Boardwalk at the Spectrum, L.P., a Texas Limited Partnership for construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Water Lights LJA Job No. 1129-0003, will be received at the office of the Engineer, 5959 Corporate Drive, Suite 3500, Houston, Texas 77036, until 2:00 p.m.,Tuesday, December 9,2008, and then publicly opened and read aloud. Copies of the Plans and Specifications may be obtained from the Engineer for a non-refundable fee of $80.00 per set. Boardwalk at the Spectrum, L.P., a Texas Limited Partnership will hold a non-mandatory pre-bid conference at the office of LJA Engineering & Surveying, Inc., 5959 Corporate Drive, Suite 3500, Houston, Texas 77036, at 2:00 p.m., Tuesday, November 25, 2008. Boardwalk at the Spectrum, L.P., a El Texas Limited Partnership reserves the right to reject any and all bids. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. (Texas Water Code 49.273) Bid security in the form of bid bond or cashier's check payable to Boardwalk at the Spectrum, L.P., a Texas Limited Partnership in an amount not less than five percent (5%) of the Bid submitted, must accompany each Bid. Advertisement dates: 11/13/08 and 11/20/08 E • E E E Page 1 of 1 ADDENDUM NO Invitation to Bidders O:\LAND\1129\1129-0003\BIDDOCS\WaterLightsBD.doc [7, EINSTRUCTIONS TO BIDDERS IMPORTANT NOTICE: Bidder must read ALL Instructions. Failure to do so may result in a non- responsive Bid. Failure to do so does not release Bidder from the obligation to comply. 1. Submission of Bids 1.1 In accordance with the Plans and Specifications prepared by the ENGINEER, any Proposal received after the published time of the bid opening will be returned unopened. 1.2 The OWNER reserves the right to reject any or all Bids if the OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or other criteria established by OWNER. 1.3 Bids shall be submitted at the location and time indicated in the Invitation to Bidders and shall be enclosed in an opaque sealed envelope, marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted)and name and address of Bidder and accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. Bids which are not received by the time and at the location specified in the Bidding Documents,will be returned unopened to the Bidder. L_' 1.4 By submitting a Bid, each Bidder agrees to fully and forever waive and release any claim (known or unknown) it has or may have against the OWNER, DEVELOPER, ARCHITECT and ENGINEER, and their respective attorneys, employees, consultants, representatives, agents, successors, assigns, officers, directors, and members arising under the statutes of Texas, tort, contract or otherwise; or out of or in connection with the: (i) administration, evaluation, or recommendation (or lack thereof) of any Bid; (ii) waiver of any requirements under the Bid Documents or the CONTRACT DOCUMENTS; (iii) acceptance or rejection of any bids; (iv) award of the Contract; and, (v) provision of references (positive or negative) in connection with any work performed by Bidder, and Bidder's contractors and subcontractors in connection with the Project and the CONTRACT DOCUMENTS, to which Bidder hereby consents and authorizes. 1.5 All work must conform to Federal, State and local governmental rules and criteria. 2. Copies of the Bidding Documents 2.1 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the Invitation to Bidders may be obtained from the ENGINEER's Office. Checks for the Plans and Specifications shall be made payable to LJA Engineering & Surveying, Inc. 2.2 Copies of Bidding Documents are made available only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use. 2.3 Complete sets of Bidding Documents must be used in preparing Bids; neither OWNER nor ENGINEER assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.4 The Bidding Documents may include reports on the geotechnical, subsurface, physical or environmental conditions which contain information used by the ENGINEER and OWNER. Neither the ENGINEER nor OWNER are responsible for accuracy or Page 1 of 8 Instructions to Bidders o:\LAND\1129\1129-0003\BIDDDCS\water Lights BD.doc completeness of any such information or data. Bidder shall have full responsibility for interpretation of the reports and use of the information for bidding and construction purposes. L 3. Bid Security 3.1 Each Bid must be accompanied by Bid security made payable to OWNER in an amount of no less than five percent (5%) of the Bidder's maximum Bid price and in the form of cashier's check or bid bond as specified in the Special Conditions. If a cashier's check is furnished, it is to be drawn on a bank in the county where the Project is located or counties bordering that county. The security is a guarantee that the successful Bidder will enter into the Contract and execute the required payment and performance and maintenance bonds. 3.2 The Bid security of Successful Bidder will be retained until such Bidder has executed the Agreement, furnished the required contract security and met the other conditions of the [I' Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within seven (7) days after the Notice of Award, OWNER may annul the Notice of Award and the Bid security of that Bidder will be forfeited. 3.3 The Bid security of other Bidders whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of the seventh (7th) day after the Effective Date of the Agreement or the ninetieth (90th) day after the Bid Lopening, whereupon Bid security furnished by such Bidders will be returned. Bid security with Bids which are not competitive will be returned within seven (7) days after the Bid opening. 4. Contract Documents Contract Documents include the Agreement, Addenda, all Conditions (General, Supplementary and Special), specifications and plans, the Bid Proposal, and any written modifications. 5. Defined Terms Terms used in these Instructions to Bidders which are defined in the Standard General Conditions have the meanings assigned to them in the Standard General Conditions unless modified by the Supplementary and Special Conditions. 6. Successful Bidder Successful Bidder if any, is the Bidder offering the best value for the OWNER based on the below criteria and on its evaluation. (Texas Local Government Code 252.043 and 271.116) Bid Evaluation Criteria: 1) Purchase price; 2) Representations of Bidder and Bidder's goods and services; 3) Quality of Bidder's goods and services; 4) Extent to which the goods and services meet the Owner's needs; E Page2of8 EInstructions to Bidders o:\LAND1112911129-0003\BIDDDCS\WeterLights BD.doc E 5) Bidder's past relationship with the Owner; E 6) Long term costs to acquire Bidder's goods and services; 7) Impact on historically under-utilized business rules to the extent applicable; 8) Other relevant criteria as identified in the Statement of Qualifications. 7. Bid Proposal Form 7.1 The Bid Proposal Form is included with the Bidding Documents; additional copies may be obtained from the ENGINEER. E7.2 All blanks on the Bid Proposal Form must be completed by printing in ink or by typewriter. 7.3 Bids by corporations must be executed in the corporate name by the president or a vice- president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature. 7.4 Bids by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature and the official address of the partnership must be shown below the signature. Bids by limited partnerships must be executed by an authorized representative of the general partner on behalf of the general partner. 7.5 All names must be typed or printed in ink below the signature. The address (including County), telephone number, e-mail address (if available), and facsimile number for communications regarding the Bid must be shown. 7.6 The Bid shall contain an acknowledgment of receipt of all Addenda (the numbers of which must be filled in on the Bid Proposal Form). 7.7 Evidence of authority to conduct business as an out-of-state corporation in the state where the Work is to be performed, shall be provided. State Contractor license number, if any, must also be shown. 8. Interpretations and Addenda 8.1 All questions about the meaning or intent of the Bidding Documents are to be directed to ENGINEER. As necessary, interpretations or clarifications will be issued by Addenda mailed or delivered to all parties having received the Bidding Documents. Questions received less than three days prior to the date for opening of Bids may not be answered. Verbal discussions and answers are not binding. 8.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or ENGINEER. 9. Self Performing As a condition of this Agreement, the CONTRACTOR is required to self perform at least 60 [11 percent of the work (based on total contract price awarded, complete in place) with personnel directly employed by CONTRACTOR. I Page 3 of 8 Instructions to Bidders o:\LAND\112911129-0003\Biuoocs\water Lights BD.doc 10. Subcontractors, Suppliers and Others 10.1 If the Special Conditions require the identity of certain Subcontractors, Suppliers and other persons and organizations (including those who are to furnish the principal items of material and equipment) to be submitted to OWNER prior to the Effective Date of the Agreement, apparent Successful Bidder, and any other Bidder so requested, shall within five days after the Bid opening, submit to OWNER a list of all such Subcontractors, Suppliers and other persons and organizations. 10.2 OWNER reserves the right to reject a proposed subcontractor or supplier at its sole discretion. OWNER may request apparent Successful Bidder to submit an acceptable substitute without an increase in Bid price. If apparent Successful Bidder declines to make any such substitution, OWNER may award the contract to another Bidder meeting the Bid requirements that proposes to use acceptable subcontractors, suppliers, and other persons and organizations. By declining to make requested substitutes, the apparent Successful Bidder will not sacrifice their Bid security. 10.3 No CONTRACTOR shall be required to employ any subcontractor, supplier, organization against whom CONTRACTOR has reasonable objection. 11. Examination of Contract Documents and Site 11.1 It is the responsibility of each Bidder before submitting a Bid: 11.1.1 To thoroughly examine the Contract Documents and other reports, tests, and drawings identified in the Bidding Documents and Special Conditions. Bidder is instructed to read all Bidding and Contract Documents before completing the bid form. Bidder is advised that failure to read Contract Documents, including without limitation, the General, Supplementary and Special Conditions, does not relieve Bidder from compliance with these documents. 11.1.1.1 Copies of available reports, tests and drawings will be produced by OWNER for review by Bidder on request. OWNER and ENGINEER disclaim any responsibility for the accuracy, true location and extent of surface and subsurface investigations that have been prepared by others. 11.1.1.2 Bidder is responsible for any interpretation or conclusion drawn from any reports, tests, and drawings, or any such data, interpretations, opinions or information, and OWNER and ENGINEER disclaim any responsibility for such interpretations by Bidders, e.g., without limitation, projecting soil-bearing values, rock profiles, soil stability and the presence, level and extent of underground water or underground facilities. 11.1.1.3 Bidder will be responsible for considering how said reports, tests and drawings may relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Bidder and safety precautions and programs performing the Work in accordance with the Contract Documents. 11.1.2 To visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work; Page 4 of 8 Instructions to Bidders O:\IAND\1129\1129-00031BIDDOCS\Water Lights BD.doc 11.1.3 To consider Federal, State and local laws and regulations that may affect cost, progress, performance or furnishing of the Work; 11.1.4 To correlate Bidder's knowledge and observations of the site with the Contract Documents and such other related reports, tests and drawings; 11.1.5 To promptly notify ENGINEER of all conflicts, errors, ambiguities or discrepancies which Bidder has discovered in or between the Contract Documents and such other related documents. 11.2 On request, OWNER may provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies. 12. Availability of Lands for Work, etc. The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by CONTRACTOR in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by the CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by OWNER unless otherwise provided in the Contract Documents. 13. Substitute and "Or-Equal" Items All Bids shall be based on work, materials and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or"or-equal" items. Although the Drawings or Specifications may state a substitute or"or-equal" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to ENGINEER, Bids shall not be based on any substitutions or as equal items. ENGINEER will not consider any application for substitute or as equal until after the Effective Date of the Agreement. The procedure for submission of any such application by CONTRACTOR and consideration by ENGINEER is set forth in the Standard General Conditions and may be supplemented in the Special Conditions. 14. Contract Time The number of calendar days within which, or the dates by which, the Work is to be substantially completed and the Work is to achieve final completion are set forth in the Agreement and in the Special Conditions. 15. Liquidated Damages for Late Completion of Work The CONTRACTOR and the OWNER agree that time is of the essence of this Contract. The CONTRACTOR and the OWNER agree that the Agreement is based on completion of the Work by CONTRACTOR in the time specified in the Agreement. CONTRACTOR and the OWNER agree that for each and every calendar day the work or any portion thereof shall remain uncompleted after the expiration of the time limit set in the Contract, or as extended under the provisions for Extension of Time in this Contract, CONTRACTOR shall be liable to OWNER for liquidated damages in an amount specified in the Special Conditions for such calendar day. The OWNER shall have the option to deduct and withhold said amount from any monies that the OWNER owes the CONTRACTOR or to recover such amount from the CONTRACTOR or the Sureties on the CONTRACTOR's bond. Page 5 of 8 Instructions to Bidders 0:\LAND\1129\1129-0003\BIDDOCS\Water Lights BD.doc L.+ 16. Modification and Withdrawal of Bids [41 16.1 Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. 16.2 If, within twenty-four hours after Bids are opened, any Bidder files a duly signed, written notice with OWNER and promptly thereafter demonstrates to the reasonable satisfaction of OWNER that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid and the Bid security will be returned. Thereafter, that Bidder will be disqualified from further bidding on the Work to be provided under the Contract Documents. 17. Opening of Bids Bids will be opened and read aloud publicly at the place where Bids are to be submitted. OWNER shall rank the Bidders within forty-five (45) days after opening the Bids. An abstract of the amounts of the base Bids and major alternatives (if any) will be made available to Bidders after the opening of Bids. 18. Bids to Remain Subject to Acceptance 18.1 All Bids will remain subject to acceptance for ninety (90) days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. 19. Award of Contract 19.1 If the contract is to be awarded, it will be awarded to the Successful Bidder as evaluated by OWNER. The Bid price shall include such amounts as the Bidder deems proper for overhead and profit. 19.2 Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words or figures will be resolved in favor of the words. In case of any ambiguity or lack of clarity in stating the prices in the Bid, OWNER reserves the right to consider the most advantageous construction thereof or reject the Bid. L 19.3 OWNER reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids. OWNER also reserves the right to waive all irregularities and defects in the Bids and the bidding process, except time of submitting a Bid. 19.4 OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications and financial ability of bidders, proposed subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the CONTRACT DOCUMENTS to OWNER's satisfaction. OWNER may require Bidders to submit bank references and financial statements in connection with bid evaluation. 19.5 OWNER may also consider Bidder's (or Bidder's officers', partners', directors', affiliates') (i) prior dealings with OWNER or with any entity responsible for payment to Bidder under this Contract and (ii) the amount, size, number, cost and completion-status of any projects that Bidder currently has underway (including, without limitation, projects underway with OWNER or with any entity responsible for payment to Bidder under this Page 6 of 8 ADDENDUM NO.2 Instructions to Bidders o:\LAND\11291129 OOos\BiODocs\water iights BD.doc F Contract), and the amount, nature and quality of the manpower, materials and equipment available to bidder. E 19.6 By submitting a Bid, each Bidder agrees to fully and forever waive and release any claim (known or unknown) it has or may have against the OWNER, DEVELOPER, ARCHITECT and ENGINEER, and their respective attorneys, employees, consultants, representatives, agents, successors, assigns, officers, directors, and members arising under the statutes of Texas, tort, contract or otherwise; or out of or in connection with the: (i) administration, evaluation, or recommendation (or lack thereof) or any BID; (ii) waiver of any requirements under the Bid Documents or the CONTRACT DOCUMENTS; (iii) E acceptance or rejection of any bids; (iv) award of the Contract; and (v) provision of references (positive or negative) in connection with any work performed by Bidder, and Bidder's contractors and subcontractors in connection with the Project and the CONTRACT DOCUMENTS, to which Bidder hereby consents and authorizes. C 19.7 If the contract is to be awarded, OWNER will give the Successful Bidder Notice of Award within ninety(90) days after the day of the Bid opening. L20. Bonds Standard General Conditions and the Special Conditions set forth OWNER's requirements, if any, as to Bonds. When the Successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by the required payment and performance bonds. 21. Signing of Agreement When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within seven days thereafter CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER with the required Bonds. Within ten days thereafter OWNER shall deliver one fully signed counterpart to CONTRACTOR. 22. Retainage The amount of retainage is set forth in the Special Conditions. 23. Sales Tax 23.1 Applicable taxes, licenses, fees and other similar items are part of the cost of the work and it shall be CONTRACTOR's responsibility to familiarize itself with these costs and to observe and comply with the laws and regulations relating to the same. The prices, sums, rates and other charges set forth in the CONTRACTOR's bid shall cover and include all such costs. 23.2 The Special Conditions will indicate if OWNER is exempt from sales tax. 24. Insurance Requirements CONTRACTOR shall maintain such insurance as specified in the Standard General, Supplementary, and Special Conditions. 25. Estimates of Quantities Unless otherwise noted in the Special Conditions, the quantities listed in the Bid Proposal shall be considered as approximate and will be used only for comparison of Bids. Payment to the Page 7 of 8 Instructions to Bidders O:\LAND\1129\1129-0003\BIDDOCS\Water Lights BD.doc E CONTRACTOR will be made only for the actual quantities of work performed or materials furnished in accordance with the contract. The quantities may be increased or decreased as provided in the Standard General Conditions without in any way invalidating the unit Bid prices. 26. Statement of Qualifications EThe Bidder shall submit with the bid a Bidder's Preliminary Statement of Qualifications. In addition, the Bidder will be required to submit a detailed Statement of Qualifications on the form provided by the Engineer within five (5)working days of the bid opening to be considered for award of the bid. E E { Page8of8 Instructions to Bidders O:\LAND\1129\1129-0003\BIDDOCS\Water Lights BD.doc E BID PROPOSAL Date: / F � / Bid of )J 01 LA. (Legal Name of idder—Company) [ ] an individual proprietorship i [ ] a corporation organized and existing under the laws of \. L I a partnership consisting of [ ] a joint verdure [ ] other FOR: CONSTRUCTION OF THE WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS LJA JOB NO 1129-0003 E TO: Boardwalk at the Spectrum,LP.,A Texas Limited Partnership Pe P c/o LJA Engineering&Surveying,Inc. 5959 Corporate Drive,Suite 3500 Houston,Texas 77036 E E Page 1 of 16 ADDENDUM NO.2 O,LANDYI729S1129-00031BIDDOCStWataL'ghl3 WSD BP.doe . 1 1 7 PROPOSAL BIDDING SHEET I i CONSTRUCTION OF THE WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND ,I E BRAZORIA COUNTY,TEXAS LJA JOB NO.1129-0003 1 El Gentlemen: Pursuant to the foregoing Invitation and Instructions to Bidders, the undersigned bidder hereby proposes to do all the work for the unit prices bid to furnish all necessary superintendence, labor, machine, equipment, tools, materials, [7 insurance and miscellaneous items,to complete all work according to the bids,as provided in the construction plan and contract documents for the construction of the Water.Sanitary Sewer and Drainage Facilities to Serve Water Lights,and clean up the site to the satisfaction of the Owner/Engineer,and bind himself on acceptance of this proposal to execute a rcontract and bonds for completing said project within the time stated for the following prices,to wit: WATER ITEMS 7 ITEM QTY. UNIT ITEM DESCRIPTION AND TOTAL WRITTEN UNIT AMOUNT NO, UNIT PRICE - PRICE 1. 1,525 LF 12°PVC Water Pipe,C-900,DR-18,All Depths, 7 to Include Bedding and All Fittings, Complete in place for \ «-I a,— --- ` �,,.i r dollars 7 and ;-.I cents $ I �— $ _ G) to d '.Z s— per unit �4 2. 1,317 LF 16"PVC Water Pipe,C-905,DR 18,All Depths, — To Include Bedding and All Fittings, Complete In place for EI'_ \=. / �`--_ -P dollars and �:�\ �ev, 31 f o L per unit $ �� I E3. 9 EA Fire Hydrant Unit,All Depths,Includes Appropriate Tee,6°Valve&Box,6"Lead and Fire Hydrant, Complete in place for 7 ,`_'(",re- �-\,� 5„- `, -k^�e_F�..-..,d�{-dollars _ • .- and au cents $ .3 5 00 - $ 31 0 U per unit E. 4. 2 EA 16"AWWA Butterfly Valve&Box, Complete in place for —e-- -c c''v.r-,-- -O.,_,r \400 i r&dollars 7 and I., cents $ V�D $ v©'� per unit 7 7 Page 2 of 16 ADDENDUM 1li0.2 0:1LANDU12311129-00031BIDDOCSIWaterLfBhts WSD BP.doc E 7 PROPOSAL BIDDING SHEET-CONTINUED CONSTRUCTION OF THE WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS 7 LJA JOB NO.1129.0003 WATER ITEMS 17 ITEM CITY. UNIT ITEM DESCRIPTION AND TOTAL WRITTEN UNIT NO. UNIT PRICE PRICE AMOUNT 5. 6 EA 12"Gate Valve&Box, 7 Complete in place for dollars r and �, e3 e " per unit cents $ d $ �/ G o 6. 1 EA Remove Existing 16"Plug and Clamp and 2" 7 Blow—Off Valve and Box and Connect Proposed 16"Water Line,Includes All Necessary Adapters and Connectors, Complete in place for 7 `/� `AO A "-,\—i'6- dollars and ' R cents $ '3 6 O' ..� " 7. per unit $ v G 7. 2,559 LF Trench Safety System,All Depths, rComplete in place for L_ ,,, dollars n o and Tv cents $ $ 25 7 per unit 8. 4 EA 2"Blow-Off Valve&Box,Includes Any Necessary Adapters and Connectors, 7 Complete in place for ``'`t ---A re- 5 c K t --t V--x ki-a dollars and () cents $ 76 $ 3f 'f3 G 0 E • per unit 9_ 155 LF 12"Welded Steel Water Line,Including �r Coatings,Bends,Electrical Insulation Kits. i Adapters,Etc. f� Complete T place for 0A.1- 1 ..)-4. C PA. .,7(-n -0'(dollars 7 and 1Vo cents $ J`f I $ /� 25�~ per unit 7 C Page 3 of 16 ADDENDUM NO.2 O:1 AND1112841129-00031BIDDOCS1Watm Lights_WSD BP.doc 7 PROPOSAL BIDDING SHEET-CONTINUED CONSTRUCTION OF THE WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEAR/AND BRAZORIA COUNTY.TEXAS LJA JOB NO.1129-0003 fl WATER ITEMS EITEM QTY. UNIT ITEM DESCRIPTION AND TOTAL WRITTEN NO. UNIT PRICE UNIT PRICE AMOUNT 7 10. 58 LF Bore for 16"Water(Does Not Include Pipe), Complete in place for "'-'r V-`-LC---,- -›c' dollars �/ 7 and per unit , cents $ / $ 2 -- 11. 80 LF Bore for 12"Water Line(Does Not Include [I Pile). Complete in place for ~`',:r��. v r dollars 7 and c, cents $ '4/ $ J 7 per unit 0 _ 7 12. 870 CY Excavation,Haul and Compaction of Utility Spoil for Fill of Existing Ditch, Complete in place for ______--c_.- S 0 dollars Lul and V / z D �- per unit cents � � $ / 7 C SUBTOTAL WATER ITEMS $ //3,, ;5 j 7 7 r r 7 Page 4 of 16 9 ADDENDUM N0.3 a.11AND111z81112s-Uo0MIDDOCS1waferLigfvs WSD ZP.doc 7 E. C PROPOSAL BIDDING SHEET 7 CONSTRUCTION OF THE WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER IJGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS ! LJA JOB NO.1129-0003 SANITARY SEWER ITEMS 7 ITEM QTY. UNIT ITEM DESCRIPTION AND TOT AL WRITTEN AMOUNT NO. UNIT PRICE PRICE i 7 1. 400 LF 12"PVC Sewer Pipe,ASTM D-2241,SDR 26, 0'-8'Cut,To include Bedding Complete in place for 7 l `�'` •1.,-- --A. dollars and �Ne, cents qq per unit �` $ 40a 7 2. 800 LF 15`PVC Sewer Pipe,ASTM D-3034,SDR 26, 0'-8'Cut,To Include Bedding, Completeom in place for fl ,• ,e✓,C-:` .J c? dollars �-c 3 c7 and �\ �:: 4,- cents $ -S r '- $ � Lf e 7 per unit 3- 1,272 LF 15"PVC Sewer Pipe,ASTM D-3034,SDR 26, 8'-10'Cut,To Include Bedding, L17 _ Complete in place for _ \ : e-,.:` `-) - dollars v and . �^ cents $ 'AS $ 3 per unit 4. 20 LF 18"P.V.C.Sewer PipePS 46,F679,0'-8'Cut, 7 To Include Bedding, Complete in place for (- ` �- en dollars c 7and ��,Q it P cents $ I0 $ ? V per unit 5. 40 LF Bore 15"Sanitary Sewer Under Existing Storm 7 Sewer,(Excluding Pipe), Complete in place for �'�--"- dollars 7 and 'ice YE) cents $ / d $ per unit 7 7 Page 5 of 16 ADDENDUM NO.2 03LAND1112951129-00031BIDDOCSSwatatWits wSD BP.doC 7 7 7 PROPOSAL BIDDING SHEET-CONTINUED CONSTRUCTION OF THE 7 WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS El. LJAJOB No.1129-0003 SANITARY SEWER ITEMS EITEM QTY. UNIT ITEM DESCRIPTION AND TOTAL WRITTEN UNIT AMOUNT NO. UNIT PRICE PRICE 7 6. 9 EA Standard Sanitary Sewer Manhole for 6"-24" Sanitary Sewer Pipes,(8'Depth), CompleteCo_ in place for "`Ce_e o.,r= .. ,_dollars E e_ and t�\lei cents $ '3v©o $ 9-7 OP -- per unit J 7 7. 29.80 VF Extra Depth of Standard Sanitary Sewer Manhole,(Over 8'Depth), Complete in place for 7 C.A.., t_kv-,,c c-2 \ dollars and �G cents $ /13 ©. per unit $ 7 8. 2,492 LF Trench Safety System.All Depths, Complete in place for 7 dollars 0 and \ '�`,V_ cents $ 47 ' - $ 1/ �" per unit 7 9. 1 EA Contractor Shall Remove Existing 15" Sanitary Sewer Plug and Construct Proposed Sanitary Sewer, 7 Complete in place for 0"-k-e. L,N_ dollars �j _ Eand :h cents $ / 972~� $per unit 10. 1 EA Contractor Shall Plug Proposed Manhole#S- 104 FL(S)18-Sanitary Sewer for Future 7 Connection, Complete in place for O vl.e t " 1 f e c' dollars > 7a,, nd )G cents $ / P $ O per unit 7 7 _ Page 6 of 16 ADDENDUM NO.2 O:UlWD111291i729-00031sIDDOcSlwaterLighta NSrlOPdac C 7 PROPOSAL BIDDING SHEET-CONTINUED CONSTRUCTION OF THE WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS LJA JOB NO.1129-0003 SANITARY SEWER ITEMS ITEM QTY. UNIT ITEM DESCRIPTION AND TOTAL WRITTEN UNIT AMOUNT NO. UNIT PRICE PRICE 11. 830 CY Excavation,Haul and Compaction of Utility Spoil for Fill of Existing Ditch, Complete in place for () dollars -r and �� cents $ i G© per unit SUBTOTAL SANITARY SEWER ITEMS 9_ , 75- E r E E E E Page 7 of 16 ADDENDUM NO.2 COLANDU92311129-00031BIDDOCSVWatet L is_W$U BP.doc E E . . PROPOSAL.BIDDING SHEET CONSTRUCTION OF THE r WATER.SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER L LIGHTS CITY OF PEARLAND 7 f BRAZORIA COUNTY,TEXAS WA JOB NO.1129-0003 DRAINAGE FACILITIES ITEMS 7 ITEM QTY. UNIT ITEM DESCRIPTION AND TOTAL.WRITTEN UNIT NO. UNIT PRICE PRICE AMOUNT 7 1. 410 LF Excavation,Haul,Compact and Hydromulch Seeding of Outfall Ditch, Complete in place for E and `-A'--Y, dollars 0 C7 "— cents $ , $ per unit 7 2. 38 SY 4'Thick Concrete Slope Paving, Complete in place for 7 Z�c k---� -'�Zvi 4- dollars and Ica cents $ C 5 per unit $ 7 3. 100 LF Remove and Dispose of Existing 10'x 7' Concrete Box Culvert, Complete in place for U ,X "r dollars `'i and k----__,d cents $ &, ` $ 2 per unit 4. 1 EA Type aC'Manhole Top for Box Culvert, Complete in place for - C1 levrP 1 iv ;,)CO3�"-A— '+ dollars and J cents $ 1 O 00 $ 3 goo per unit 7 5. 970 CY Excavation,Haul and Compaction of Utility , Spoil for Fill of Existing Ditch, Complete in 7 place for AL 0 dollars and 9 v cents $ `� _ $ j 9� 7 per unit 7 7 Page 8 of 16 ADDENDUM NO.4 O.ILANDN12911123A00318IDDOCS4WalerLighls WSD BP.doc 7 . PROPOSAL BIDDING SHEET-CONTINUED CONSTRUCTION OF THE WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS LJA JOB NO.1129-0003 DRAINAGE FACILITIES ITEMS ITEM QTY. UNIT ITEM DESCRIPTION AND TOTAL WRITTEN UNIT AMOUNT NO. UNIT PRICE PRICE 6. 240 IF 10'x 7'Precast Reinforced Concrete Box Culvert(ASTM C-1433),All Cuts, Including Bedding, Complete in place for -V,0 0 k_5(-AAre.(-1- dollars and PC) cents $ 5 O $ J�� P 9 per unit 7. 240 LE Trench Safety Systems,All Depths, Complete in place for ►vim dollars • D and � - cents $ b $ , per unit • 8. 1 LS Storm Water Pollution Prevention Plan Compliance.Including Maintaining Existing Filter Fabric Fence and Stabilized Construction C Exit, Complete in place for 1-\-v.„A_ dollars and �� cents $ ( v 0 — $ t�O 0 per unit SUBTOTAL DRAINAGE FACILITIES ITEMS 8 / 3 'f 3 6' g E E E Page 9 of 16 ADDENDUM NO.4 0.11ANrn+1291i12saoo31ei000csir a WSD®P_ax E E PROPOSAL BIDDING SHEET CONSTRUCTION OF THE ( WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER [ LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS LJA JOB NO.1129.0003 CLEARING AND GRUBBING ITEMS ITEM QTY. UNIT ITEM DESCRIPTION AND TOTAL WRITTEN UNIT AMOUNT NO. UNIT PRICE PRICE 1. 3.39 AC Clearing and Grubbing, Complete in place for fie 2 ao sa,,A dollars ancdunit � cents $ °D I0 / 7 ° p SUBTOTAL CLEARING AND GRUBBING ITEMS $ l (, ) /7 [I" Page 10 of 16 ADDENDUM NO.2 0:1LAND1112911t29-0oons oCSlWaterLlghts WSD BP.doc E C 7 . • PROPOSAL BIDDING SHEET M CONSTRUCTION OF THE L WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER UGHTS CITY OF PEARLAND 7 BRAZORIA COUNTY,TEXAS LJA JOB NO.1129-0003 MISCELLANEOUS ITEMS [I ITEM QTY. UNIT ITEM DESCRIPTION AND TOTAL WRITTEN UNIT AMOUNT NO. UNIT PRICE PRICE 7 1. 1 EA Stabilized Construction Exit at Location Shown on Plans(To Be Used ONLY at the Written Directi n of the Engineer),Complete in place for 7 U A E I D t so-v_Y-I T O 11-u, (ecidollars and V 5(u cents '62,j - / �o per unit $ [I $1,200.00• 2. 1 AC Hydromuich Seeding and Fine Grading.(To Be Used ONLY at the Written Direction of the EEngineer),Complete in place for OIL l_ I A v y 4 dollars El. pand er unit (--� cents $ �v� $ . / ne ' -- $1,000.00` / �/- 3. 1 AC Broadcast Seeding,Fertilizing,and Watering 7 (To Be Used ONLY at the Written Direction of the Engineer),Complete in place for 7 �Oc t re� dollars / and \�%�v cents $ 6 O c� $ (j !7 0 {� per unit $600.00* 6 4. 1 EA Coffer Dam for Installation of 1-10'x7'Boxes, L (To Be Used ONLY at the Written Direction of the Engineer), 7 Complete in place for `t"..:3v -Le, (;..,, tee dollars and �0 cents $, at,cr $ , ..• ,p-- 7 per unit 5. 2,670 I F Reinforced Filter Fabric Fence(Silt Barrier Fencing).(To Be Used ONLY at the Written 7 Direction of the Engineer), Complete in place for (1 w' dollars o 7 and Is—Do cents $ // ' < $ y 670 T— per unit "Denotes Minimum Unit Price Bid for Each item 7 Page 11 of 16 ADDENDUM NO.2 01..A 11a9t1129-0003VBtnn0CSlwat Wd%_WSD sP.doc 7 7 7 ' . PROPOSAL BIDDING SHEET-CONTINUED A CONSTRUCTION OF THE WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND 7 BRAZORIA COUNTY,TEXAS LJA JOB NO.1129-0003 MISCELLANEOUS ITEMS 7 ITEM QTY. UNIT ITEM DESCRIPTION AND TOTAL WRITTEN UNIT AMOUNT NO. UNIT PRICE PRICE 6. 500 HRS 8'Portable Pump for Removal of Water, [11 Complete in place for 'Twe- too dollars Eand Nib cents $ /„.1 r� $ 0O0 per unit 7. 500 HRS 12'Portable Pump for Removal of Water. Complete inin place for EG�n v r Ic-4--a'"+ dollars /.r and �a cents $ / 1 $ 1 V° -- FP per unit 8. 240 LF Additional Cost for Storm Sewer Bedding and Backfill for Unsatisfactory Soil Conditions(To 7 be Used ONLY as Directed by the Engineer), Complete in place for -\---i->t'_ dollars 7 and 1"c) cents $ 5 t $ / 2- '�� per unit 7 9. 700 LF Additional Cost for Sanitary Sewer Bedding and Backfill for Unsatisfactory Soil Conditions(To be Used ONLY as Directed by the Engineer), Complete in place for 7L1✓l dollars -70o -- and Li o cents $ / $ per unit 7 10. 700 LF Dewatering,(To be Used ONLY as Directed by the Engineer), Complete in place for 7 D v\-L° dollars � and 47 cents $ $ 7°® ! 7 per unit E 7 Page 12 of 16 ADDENDUM NO.2 QILAND1112911129-0003181DDOCSIWffier Lighh:_W$O BP doc 7 ri PROPOSAL BIDDING SHEET-CONTINUED CONSTRUCTION OF THE E WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS rig: WA JOB NO.1129-0003 MISCELLANEOUS ITEMS E ITEM QTY. UNIT ITEM DESCRIPTION AND TOTAL WRITTEN UNIT AMOUNT NO. UNIT PRICE PRICE 11. 100 LF Restrained Joint Section for 12'Water Line, 7 (Either Ductile Iron or Steel Pipe with Mechanical or Welded Joints), Complete in place for 7 1 l i/�� .61-k- -- dollars a� and �v^vEi cents $ -3 3 $ T3/ &p6'= per unit 7 12. 100 LF Restrained Joint Section for 16"Water Line, (Either Ductile Iron or Steel Pipe with Mechanical or Welded Joints); 7 Complete in place for �'T t-"_ TIN cte dollars ^ r and l• k) Dents S $ ©° 7 per unit / 13. 4 EA Temporary Bracing of Power Pole by CenterPoint, ril Complete in place for rL Tl�Ci Rv."u\. dollars ^ r and 1�-)°' cents $ 9 007 — $ rod v per unit SUBTOTAL MISCELLANEOUS ITEMS $ 797o 7 7 7 7 7 7 Page 13 of 16 ADDENDUM NO.4 O:iLANDt112911129-0003V3IDDOCcWaterLifts WSO BP.doc PROPOSAL BIDDING SHEET CONSTRUCTION OF THE L WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS LJA JOB NO.1129-0003 ALTERNATE BID ITEMS ITEM QTY. UNIT ITEM DESCRIPTION AND TOTAL WRITTEN UNIT AMOUNT NO. UNIT PRICE PRICE 1• 155 LF 2d"Steel Casing,Including 12°PVC Water Pipe,C-900,DR 18,All Depths and All Fittings, (In Lieu of Water Item No.12),12"Steel Water Line), pp� Complete in place for L. dollars and s ��� cents $ 0 $ /'` OD.- per unit SUBTOTAL ALTERNATE BID ITEMS 2 E E Page 14 of 1ti ADDENDUM NO.2 9141 O:WINDN1291112400031BIDDOCS1W8terLights WSO_eP.doc r C PROPOSAL BIDDING SUMMATION SHEET I O 7 WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND EBRAZORIA COUNTY,TEXAS WA JOB NO.1129-0003 7a 7 SUBTOTAL WATER ITEMS $ i S 3r o5 7 SUBTOTAL SANITARY SEWER ITEMS CSUBTOTAL DRAINAGE FACILITIES ITEMS $ 13 3 3 6 5' r SUBTOTAL CLEARING AND GRUBBING ITEMS $ / ) "7 n r. 7 SUBTOTAL MISCELLANEOUS ITEMS $ 3 a '-�' '7 c' e TOTAL AMOUNT BID $ 9 V o w 7 SUBTOTAL ALTERNATE BID ITEMS $ / 2` I/ 0 Q s TOTAL AMOUNT BID WITH ALTERNATE $7 (42O1q5 -9_U It is understood that in the event the successful bidder fails to enter into Contract and to furnish a x Performance Bond and Payment Bond in the amount of 100 percent of the Contract and for all parts of the work, as specified in the Instructions to Bidders,the Bidder will forfeit the Cashier's Check OR Bid Bond,as provided 7 in the Contract Documents. The undersigned proposes,if awarded the Contract,to begin work as stipulated in the written Notice to Proceed issued by the Engineer,and to substantially complete the work within 60 calendar days after the date the work 7commences and to complete the project within 75 calendar days after the date of work commences. '�` This bid proposal shall be considered part of the contract. 1.\. L, ..._____>. . - tcjeAY�^�....1- (10„,,, ,,-„-._(Signature} (Company Name—Bidder) t M.ill..*)d 1 j-L r��,N.C, .I 3 (744�-- Qom( k--r—r-2--� C (Type Name) (Address)_ (Title) (City) (County) Zip) 7 Ar,..,(Attest) (Phone No.) l C (Seal,If Bidder is a Corporation) '? �� `- {_� - (Flo.) \.)//4 r) 6,/,. -.)--Cel .1),(3 fl. ci.--1,'i--eA-- 7 (E-mail Address) E C Page 15 of 16 ADDENDUM NO.2 OALAND\11291129.00031BIDDOCSiwarer lights WSD 9P,doc C 7 CONSTRUCTION WATER,SANITARY SEWER AND DRAINAGE FACILITIES TO SERVE WATER LIGHTS CITY OF PEARLAND BRAZORIA COUNTY,TEXAS gam+ LJA JOB NO.1129-0003 ACKNOWLEDGMENT OF RECEIPT OF ADDENDUM ADDENDUM NO. i ��� a Signature Date ADDENDUM NO.2. a",/ Ignature Date `T ADDENDUM NO.3 �`� 05—0 O ign Date ADDENDUM NO.4 5-'G o ignafure Date ADDENDUM NO.5 Signature Date ADDENDUM NO.e Signature Date E E E E E Page 16 of 16 ADDENDUM NO.2 O:9N1DU12951129 10031BIDDOCStWalerLighla WSD BP.doa E i L CITY OF PEARLAND STANDARD FORM OF AGREEMENT Section 00500 STANDARD FORM OF AGREEMENT THIS AGREEMENT is by and between City of Pearland(hereinafter called OWNER or City) and Hurtado Construction Company (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK CONTRACTOR shall complete all work as specified or indicated in or reasonably inferable from the Contract Documents (hereinafter the "Work"). The Work is generally described as follows: Water, Sanitary Sewer and Drainage Facilities To Serve Water Lights City of Pearland, Texas BID NO.: 1129-0003 Article 2. ENGINEER The Work has been designed by LJA Engineering & Surveying, Inc., 2929 Briarpark, Suite 600, Houston, Texas 77042, Jeffrey DeLeon, P.E. who is hereinafter called ENGINEER and who is to assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. CONTRACT TIME 3.1 The Work will be Substantially s nhally Complete (as defined in Article 1 of the General Conditions) within ten (10) days (including weekends and holidays) from the date when the Contract Time commences to run as provided in paragraph 5.01 of the General Conditions (as revised in the Special Conditions if applicable), and completed and ready for Final Payment within ninety (90) days from the date when the Contract Time commences to run. No work will be allowed on Sundays. 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 5 of the General Conditions. OWNER and CONTRACTOR also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration preceding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER one thousand dollars ($1,000.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After 02/2008 00500- 1 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time set out in the Certificate of Substantial Completion or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER one thousand dollars ($1,000.00) for each day that expires after L the time specified in the Certificate of Substantial Completion for completion and readiness for Final Payment. 3.3 Inspection Time. Working hours for the Pearland Inspection personnel are from 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding City approved holidays. The Contractor shall notify the OWNER of any required inspection overtime work at least 48 hours in advance and shall pay the overtime wages for the required City inspections. Article 4. CONTRACT PRICE 4.1 OWNER shall pay CONTRACTOR for completion of the Work in strict accordance with the Contract Documents in current funds $420,095.90 (the "Contract Price"). The Contract Price includes the Base with the alternates as shown in the Bid Proposal. Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Section 6.0 "Measurement and Payment" of the General Conditions. Application for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1 Progress Payments. OWNER shall make progress paym ents on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by the City as provided below. All progress payments will be on the basis of the progress of the Work and actual quantity of Work completed, in accordance with Article 6 "Measurement and Payment" of the General Conditions. 5.1.1 Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage or actual quantity of Work complete, but, in each case, less the aggregate of payments previously made and less such amounts as the City shall determine, or OWNER may withhold, in accordance with the General Conditions. The OWNER shall make payment within 30 days of receipt of application for payment by the City representative. 5.1.2 Each progress payment shall be less retainage as specified in Paragraph 6.06 of the General Conditions, and further less all previous payments and all further sums that may be retained by the OWNER under the terms of this Agreement. It is understood, however, that in case the whole work be near to completion and some unexpected and unusual delay occurs due to no fault or neglect on the part of the CONTRACTOR, the OWNER may upon written recommendation of the ENGINEER and/or City representative pay a 02/2008 00500-2 of 7 E CITY OF PEARLAND STANDARD FORM OF AGREEMENT reasonable and equitable portion of the retained percentage to the CONTRACTOR, or the CONTRACTOR at the OWNER's option, may be relieved of the obligation to fully complete the Work and, thereupon, the CONTRACTOR shall receive payment of the balance due him under the contract subject only to the conditions stated under"Final Payment." 5.2 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 6.08 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER and/or City representative as provided in said paragraph 6.08. Article 6. INTEREST Interest on any overdue payment from OWNER to CONTRACTOR shall be paid in accordance with the provisions of Chapter 2251 of the Texas Government Code, as amended. Article 7. CONTRACTOR'S REPRESENTATIONS In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations: 7.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. 7.2 CONTRACTOR has studied carefully all available surveys, assessments, reports of explorations, investigations, and tests of subsurface conditions and drawings of physical conditions of the site. Such technical reports and drawings are not Contract Documents, and Owner makes no representations or warranties as to the accuracy of such documents or information, or to whether or not they are complete, comprehensive, or all-inclusive. 7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraphs 7.2 above) which pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work ,and CONTRACTOR assumes the risk of such subsurface and physical conditions, and shall furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, explorations, tests,reports, and studies or similar information or data are or will be required by CONTRACTOR for such purposes. 7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract documents with respect to existing underground facilities 02/2008 00500-3 of 7 CITY OF PEARLAND STANDARD FORM OF AGREEMENT at or contiguous to the site and assumes responsibility for the accurate location of said underground facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said underground facilities are or will be required by CONTRACTOR in order to perform and finish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents. 7.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, explorations, tests, reports, and studies with the term and conditions of the Contract Documents. 7.6 CONTRACTOR has given ENGINEER and the OWNER written notice of all conflicts, errors or discrepancies in the Contract Documents of which Contractor knew or should have known, and CONTRACTOR shall perform the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including any written resolution of any such conflict, error or discrepancy by ENGINEER. Article 8. CONTRACT DOCUMENTS The Contract Documents, which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work, consist of the following, each of which are incorporated herein by reference: 8.1 Standard Form of Agreement(Section 00500). 8.2 Performance, Payment, and/or Maintenance Bonds (Sections 00610, 00611, and 00612). 8.3 General Conditions of Agreement (Section 00700), including Attachment No. 1 Workers' Compensation Insurance Coverage, Attachment No. 2 Agreement for Final Payment and Contractor's Sworn Release, and Attachment No. 3 Owner's Insurance Requirements of Contractor. 8.4 Special Conditions of Agreement(Section 00800). 8.5 Plans, consisting of sheets numbered 1 through 19 inclusive with attachments with each sheet bearing the following general title: Water Lights— 1129-0003 8.6 Instructions to Bidders and CONTRACTOR's Bid Proposal, including any Addenda referenced therein. 8.7 Technical Specifications for the Work. 8.8 The following, which may be delivered or issued after this Agreement becomes effective: Any Change Orders or other documents amending, modifying, or supplementing the Contract Documents in accordance with the General Conditions. There are no Contract Documents other than those listed above in this Article 8. The 02/2008 00500-4 of 7 E CITY OF PEARLAND STANDARD FORM OF AGREEMENT Contract Documents may only be amended, modified or supplemented as provided in the General Conditions. Article 9. MISCELLANEOUS 9.1 Terms used in this Agreement which are defined in Section 1, "Definitions and Interpretations" of the General Conditions will have the meanings indicated in the General Conditions. 9.2 No assignment by a party hereto of any rights under or interests in the Contract L Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. • 9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representative to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents. 9.4 CONTRACTOR agrees to warranty the Work for a period of one (1) year from Substantial Completion against defects in materials and workmanship. CONTRACTOR agrees to repair or replace any defective work within this warranty period in an expeditious manner at no additional cost to OWNER. 9.5 The Work will be completed according to the Contract Documents and in accordance with codes, ordinances, and construction standards of the City of Pearland, and all applicable laws, codes and regulations of governmental authorities. 9.6 In the event any notice period required under the Contract Documents is found to be shorter than any minimum period prescribed by applicable law, the notice period required shall be construed to be the minimum period prescribed by applicable law. 9.7 This Contract and the Contract Documents, insofar as they relate in any part or in any way to the Work undertaken therein, constitute the entire agreement between the parties hereto, and it is expressly understood and agreed that there are no agreements or promises by and between said parties, except as aforesaid, and that any additions thereto or changes shall be in writing. 9.8 The provisions of this Contract shall be applied and interpreted in a manner consistent with each other so as to carry out the purposes and the intent of the parties, but if for any reason any provision is unenforceable or invalid, such provisions shall be deemed severed from this Contract and the remaining provisions shall be carried out with the same force and effect as if the severed provision had not been part of this Contract. 02/2008 00500-5 of 7 CITY OF PEARLAND STANDARD FORM OF AGR EEMENT 9.9 The headings of the paragraphs are included solely for the convenience and if there is any conflict between the headings and the text of this Contract,the CContract text shall control. 9.10 The waiver of any breach hereof shall not constitute a waiver of any subsequent breach of the same or any other provision hereof. Failure by the OWNER in any instance to insist upon observance or performance by CONTRACTOR shall not be deemed a waiver by CONTRACTOR of any such observance or performance. No waiver will be binding upon OWNER unless in writing and then will be for the particular instance only. Payment of any sum by OWNER to CONTRACTOR with knowledge of any breach or default will not be deemed a waiver of such breach or default or any other breach or default. 9.11 The CONTRACTOR acknowledges that the OWNER(through its employee handbook) considers the following to be misconduct that is grounds for termination of an employee of the OWNER: Any fraud, forgery,misappropriation of funds, receiving payment for services not performed or for hours not worked,mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the OWNER. The CONTRACTOR agrees that it will not, directly or indirectly; cause an employee of the OWNER to engage in such misconduct. E E E E E E 02/2008 00500-6 of 7 7 L CITY OF PEARLAND STANDARD FORM OF AGREEMENT IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to OWNER and .one to CONTRACTOR. This Agreement will be effective upon execution and attestation by authorized representatives of the City of Pearland and upon the following date: "June 20 OWNER: CONTRACTOR: CITY OF PEARL D Hurtado Construction Company By: _____________R Title: t2 J ,�MO - it e: President Date: �Q L' 1 J L' 3109 Date: L' = (Corporate Seal) ATTEST d (a- 43 L Address for giving notices QEARt;gyo, 2115 Center Street �/. x= Richmond, Texas 77469 /\• ?b.c' iNntln.UPN 00 Phone: 281.341.5673 Fax: 281.341.1108 Agent for service of process: E r END OF SECTION E. 02/2008 00500-7 of 7 ram+ CITY OF PEARLAND PERFORMANCE BOND rum Section 00610 Bond No. 6622430 PERFORMANCE BOND STATE OF TEXAS § COUNTY OF BRAZORIA § KNOW ALL MEN BY THESE PRESENTS: That Hurtado Construction Company of the City of Richmond, County of Fort Bend, and State of Texas, as principal, and FIRST NATIONAL INSURANCE COMPANY OF RICA authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee (Owner), in the penal sum of$420,095.90 for the payment whereof; the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns, jointly and severally, by these presents: WHEREAS, the Principal has entered into a certain written contract with the Owner, effective as of the day of 20 (the "Contract") to commence and complete , _, the construction of certain improvements described as follows: Water, Sanitary Sewer and Drainage Facilities To Serve Water Lights City of Pearland, Texas BID NO.: 1129-0003 which Contract, including the Contract Documents as defined therein, is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS. OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Contract Work and shall in all respects duly and faithfully observe and perform all and singular the covenants, conditions, and agreements in and by said Contract agreed and covenanted by the Principal to be observed and performed, and according to the true intent and meaning of said Contract and Contract Documents, then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or jrtl addition to the terms of the contract, or to the Work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work to be performed thereunder. ,q 12/2007 00610- 1 of 2 L CITY OF PEARLAND PERFORMANCE BOND �i IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument L this day of , 20_ L: Principal: Surety: FIRST NATIONAL IN. CE COMPANY Hurtado Construction Company OF ' CA By: _ z� ,� IIF+ Miguel Hurtado By: Jo Ann Parker #1 38909 Title: President T tie: Attorney—in—Fact _ Address: E = • ddress • 2115 Center Street 7610 W. Tidwell, Suite, 708 Richmond, Texas 77469 Houston, Texas 77040 - - Li Li Telephone: 281.341.5673 Telephone: 713/744-1768- rit Fax: 281.341.1108 Fax: 713/744-1780 L NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE pit OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. r L END OF SECTION L_ 7 ` TOMFORDE,AND ANDERSON,INC. dba Insurance Alliance rum 1776 Yorktown,Suite 200 Houston,Texas 77056-4114 TDI License#1381 FEIN#760362043 ICE' L I L_ rag12/2007 00610-2 of 2 L CITY OF PEARLAND PAYMENT BOND Section 00611 Bond No. 6622430 PAYMENT BOND STATE OF TEXAS § COUNTY OF BRAZORIA § KNOW ALL MEN BY THESE PRESENTS: That Hurtado Construction Company of the 7 City of Richmond , County of Fort Bend , and State of Texas, as FIRST NATIONAL INSURANCE COMPANYprincipal, and OF AMERICA authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee (Owner), in the penal sum of$420,095.90 for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns, jointly and severally, by these presents: WHEREAS, the Principal has entered into a certain written contract with the Owner, effective as of the day of , 20 , (the "Contract") to commence and complete the construction of certain improvements described as follows: Water,Sanitary Sewer and Drainage Facilities To Serve Water Lights City of Pearland, Texas BID NO.: 1129-0003 which Contract, including the Contract Documents as defined therein, is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF- THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor or material to him or a subcontractor in the prosecution of the Work provided for in said Contract, then, this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the Work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this r* bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work to be performed thereunder. L_ 07/2006 00611 -1of2 CITY OF PEARLAND PAYMENT BOND IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of 20 Principal: Surety: FIRST NATIONAL IN'. ° \ CE COMI3ANY Hurtado Construction Company OF Pd RICA 9111111,11111. Miguel Hurta o - Jo Ann Parker ##1238909 Title: President 'rtle: Attorney-in-Fac■ Address: Addres:: 2115 Center Street 7600 W. Tidwell, Suite 708 - ,411 Richmond, Texas 77469 - Houston, Texas 77040 p Telephone: 281.341.5673 Telephone: 713/744-1768 Fax: 281.341.1108 Fax: 713/744-1780 I� NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. END OF SECTION n HOUSTOUN,WOODARD,EASON,GENTLE, TOMFORDE,AND ANDERSON,INC, i Elba Insurance Alliance 1776 Yorktown,Sao 209 Houston,Texas 77056.4114 TDI License,#13Sl FEW#ice$ P - I , r. 07/2006 00611 -2 of 2 CITY OF PEARLAND ONE-YEAR MAINTENANCE BOND Section 00612 Bond No. 6622430 ONE-YEAR MAINTENANCE BOND STATE OF TEXAS § r■o COUNTY OF BRAZORIA § KNOW ALL MEN BY THESE PRESENTS: That Hurtado Construction Company of the City of Richmond County of Fort Bend , and State of Texas, as principal, and oFR R uxANCE COMPANY authorized under the laws of the State of Texas to act as surety on bonds for,principals, are held and firmly bound unto City of Pearland as Obligee (Owner), in the penal sum of$420,095.90 for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors, and assigns, jointly and severally,by these presents: WHEREAS, the Principal has entered into a certain written contract with the Owner, effective as of the day of , 20 , (the "Contract") to commence and complete the construction of certain improvements described as follows: Water, Sanitary Sewer and.Drainage Facilities to Serve Water Lights City of Pearland, Texas BID NO.: 1129-0003 which Contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully correct all such work not in accordance with the Contract Documents discovered within the one-year period from the date of substantial completion, then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code as amended and all liabilities on this bond shall be determined in 7.1 accordance with the provisions of said Statute to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the work performed thereunder,, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder. L. 1 - 07/2006 00612- 1 of2 7 CITY OF PEARLAND ONE-YEAR MAINTENANCE BOND IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of 20 Principal: Hurtado Construction Company Surety: FIRST NATIO\AL INSURANCE COMPANY OF AMERICA Ah, wKw gy`• � �� — By: AFL.__ O Miguel Hurtado '� �_--_ . Ann Parker #1 38909- Title: President Ti e: A torney—in—Fact - -Address: At. ess• 2115 Center Street 7600 W. Tidwell, Suite 708 Richmond, Texas Houston, Texas 77040 Telephone: 281.341.5673 Telephone: 713/744-17 6 8 Fax: 281.341.1108 Fax: 713/744-1780 NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE NUMBER; 1-800-252-3439. `+ END OF SECTION HOUSTOUN,WOODARD,EASON,GENTLE, TOMFORDE,AND ANDERSON,INC. dba Insurance Alliance 1776 Yorktown,Suite 200 Houston,Texas 77056-4114 TD1 License#1381 FEIN Y760362043 r _ L L_ 07/2006 00612-2 of 2 • t 1L!berty POWER First National Insurance Company of America r3 i 1001 4th Avenue � :_: OF ATTORNEY Suite 1700 • Seattle,WA 98154 KNOW ALL BY THESE PRESENTS: No. 9197 That FIRST NATIONAL INSURANCE COMPANY OF AMERICA,a Washington corporation,does hereby appoint I ************"'*'C.W.ADAMS;HARLAN J.BERGER;SHARON CAVANAUGH;MICHAEL COLE;CHERYL R.COLSON; ANDREW J.JANDA;SUE KOHLER;JO ANN PARKER;LELAN D L RAUCH;DONALD E.WOODARD,JR.; Houston,Texas**************.****** ************************************ ******************x********x L_ rit its true and lawful attomey(s)-in-fact, with full authority to execute on behalf of the company. fidelity and surety bonds or undertakings and other documents of a similar character issued by the company in the course of its'business, and to bind FIRST NATIONAL INSURANCE COMPANY OF AMERICA thereby as fully as if such instruments had been duly executed by its regularly elected officers at its home office. IN WITNESS WHEREOF,FIRST NATIONAL INSURANCE COMPANY OF AMERICA has executed and attested these presents this 21st day of March , 2009 . Pi-X0* A 1,en Dexter R.Legg,Secretary Timothy A.Mikolajewski,Vice President CERTIFICATE Extract from the By-Laws of FIRST NATIONAL INSURANCE COMPANY OF AMERICA: ! "Article V,Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President,the Secretary, and any Assistant Vice President appointed for that purpose by the officer in charge of surety operations, shall each have authority to appoint individuals as attorneys-in-fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the company in the course of its business...On any instrument making or evidencing such appointment,the signatures may be affixed by facsimile.On any instrument conferring such authority or on any bond or undertaking of the company, the seal, or a facsimile thereof, may be impressed or affixed or in pny other manner reproduced; provided,however,that the seal shall not be necessary'to the validity of any such instrument or undertaking." rui Extract from a Resolution of the Board of Directors of FIRST NATIONAL INSURANCE COMPANY OF AMERICA adopted July 28,1970. "On any certificate executed by the Secretary or an assistant secretary of the Company setting out, (i) The provisions of Article V,Section 13 of the By-Laws,and r`1 (ii) A copy of the power-of-attorney appointment,executed pursuant thereto,and (iii) Certifying that said power-of-attorney appointment is in full force and effect, the signature of the certifying officer maybe by facsimile,and the seal of the Company may be a facsimile thereof." {''14 I, Dexter R. Legg ,Secretary of FIRST NATIONAL INSURANCE COMPANY OF AMERICA,do hereby certify that the foregoing extracts of the By-Laws and of a Resolution of the Board of Directors of this corporation, and of a Power of Attorney L issued pursuant thereto, are true and correct, and that both the By-Laws,the Resolution and the Power of Attorney are still in full force and effect. IN WITNESS WHEREOF,I have hereunto set my hand and affixed the facsimile seal of said corporation this day of 2009 . p 4.2 rz 20 `aii ° int Dexter R.Legg,Secretary S-1049/DF 3/09 • 'F WEB PDF L L Figure:28 TAC§1.601(a)(3) re 1 IMPORTANT NOTICE AVISO IMPORTANTE To obtain information or make a complaint: Para obtener informacion o para someter una queja: Ly 2 You may contact Home Office Surety at Usted puede contactar a servicio de la oficina I 1-206-473-3799 principal de Safeco Surety at:1-206-473-3799 3 You may call (company)'s toll-free telephone Usted puede Ilamar al numero de telefono �+e number for information or to make a complaint gratis de(company)'s para informacion o at: para someter una queja al: (800)472-5357 Surety Option #7 (800)472-5357 Surety Opcion De#7 4 You may also write to Safeco Usted tambien puede escribir a Safeco Insurance Company at: Insurance Company I Safeco Plaza Safeco Plaza Seattle, WA 98185 Seattle, WA 98185 5 You may contact the Texas Department of Puede comunicarse con el Departmento de �, Insurance to obtain information on companies, Seguros de Texas para obtener informacion coverages, rights or complaints at: acerca de companias, coberturas, derechos o quejas al: (800)252-3439 (800)252-3439 Li rig 6 You may write the Texas Department of Puede escribir al Departamento de Seguros L Insurance: de Texas: P.O. Box 149104 P.O. Box 149104 Austin,TX 78714-9104 Austin,TX 78714-9104 Fax: (512)475-1771 Fax: (512)475-1771 Web: http://www.tdi.state.tx.us Web: http://www.tdi.state.tx.us E-mail:ConsumerProtection@tdi.state.tx.us E-mail:ConsumerProtection@tdi.state.tx.us r 7 PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS 0 RECLAMOS: Should you have a dispute concerning your Si tiene una disputa concemiente a su prima o a r + premium or about a claim you should contact un reclamo,debe comunicarse con el(agente)(la the(agent)(company)(agent or the company) compania)(agente o la companla)primero. Si no first. If the dispute is not resolved,you may se resuelve la disputa, puede entonces contact the Texas Department of Insurance. comunicarse con el departamento(TDI). 8 ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AVISO A SU POLIZA: Este aviso This notice is for information only and does not es solo para proposito de informacion y no se r4+ become a part or condition of the attached convierte en parte o condicion del documento document. adjunto. P _ S-6128/SA 7/07 XDP I^ L 1 - AC R® DATE(MM/DD/YYYY) CERTIFICATE OF LIABILITY INSURANCE Page 1 of 2 05/22/2009 la? PRODUCER 877-945-7378 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Willis of Texas, Inc. HOLDER, THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 26 Century Blvd. ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P. O. Box 305191 „w Nashville, TN 37230-5191 INSURERS AFFORDING COVERAGE NAIL# INSURED Hurtado Construction Company INSURERA Travelers Lloyds of Texas Insurance Compa 41564-002 215 Center Street Richmond, TX 77469 INSURERS:Travelers Property Casualty Company of Am 25674-001 rill INSURER C:The Travelers Indemnity Company of Connec 25682-001 INSURER D: I INSURER E COVERAGES IR THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR -- MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADD'L POLICY EFFECTIVE POLICY EXPIRATION MI LTR MEND TYPE OF INSURANCE POLICY NUMBER DATE(PAM/DDNYYYI DATE(MMIDD/VYY1/) LIMITS A GENERALLIABIUTY DTCO5463B140TLCO9 2/4/2009 2/4/2010 EACHOCCURRENCE $ 1,000,000 ` COMMERCIAL GENERAL LIABILITY PREMISES(E aoccurence) $ 300,000 CLAIMS MADE X OCCUR MED EXP(Any one person) $ 5,000 wR PERSONAL E.ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 ` GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 ill POLICY n IS IA n LOC B AUTOMOBILE LIABILITY BA2980N48609CNS 2/4/2009 2/4/2010 COMBINED SINGLE LIMIT $ 1,000,000 X ANY AUTO (Ea accident) ALL OWNED AUTOS BODILY INJURY $ IP SCHEDULED AUTOS (Per person) I HIRED AUTOS BODILY INJURY $ NON-OWNED AUTOS (Per accident) i PROPERTY DAMAGE $ (Per accident) - GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ ,R AUTO ONLY: AGG $ C EXCESS/UMBRELLA UABILITY DTSMCUP5463B152TCTO9 2/4/2009 2/4/2010 EACHOCCURRENCE $ 1,000,000 X OCCUR CLAIMS MADE AGGREGATE $ 1,000,000 $ DEDUCTIBLE $ _ X RETENTION $ 10,000 $ L. WORKERS COMPENSATION DTEUB5463B17609 2/4/2009 2/4/2010 X TORYLIMIIITs OTH- ER AND EMPLOYERS'LIABILITY 1 ANY PROPRIETOR/PARTNERIEXECUTIVEI NN 1 EL EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? (MandatoryinNH) EL DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under SPECIAL PROVISIONS below EL DISEASE-POLICY LIMIT $ 1,000,000 OTHER MN I ` DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS RE: Water Lights WS&D project rim ? Additional Insured (except for WC) in favor of City of Pearland and LJA Engineering & Surveying, L Inc. as required by written contract. - CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION MI DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN I NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR City of Pearland 7/4 C/o LJA Engineering & Surveying, Inc. REPRESENTATIVES. 5959 Corporate Drive, Suite 3500 TPS O RIZEDREPReSE A Houston, TX 77036 ��• �~ • ACORD 25(2009/01) Col 1:2707456 Tp1:903063 Cert:12568676 ©1988-200' CORD CORPORATION.All rights reserved. The ACORD name and logo are registered marks of ACORD L Page 2 of 2 • IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). 'ee If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER a This Certificate of Insurance does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. I r, i ; ACORD 25(2009101) Co11:2707456 Tp1:903063 Cert:12568676 R. L AC R DATE(MMIDDIYYYY) CERTIFICATE OF LIABILITY INSURANCE Page 1 of 2 05/22/2009 fnl PRODUCER 877-945-7378 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Willis of Texas, Inc. HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 26 Century Blvd. ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P. O. Box 305191 AI Nashville, TN 37230-5191 INSURERS AFFORDING COVERAGE NAIL# INSURED Hurtado Construction Company INSURERA:Travelers Lloyds of Texas Insurance Compa 41564-002 215 Center Street INSURER B:Travelers Property Casualty Company of Am 25674-001 Richmond, TX 77469 wl INSURER C:The Travelers Indemnity Company of Connec 25682-001 1 INSURER D: I INSURER E COVERAGES Nim 1 THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ' ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. • INSR INSRC TYPE OF INSURANCE POLICY NUMBER DATE IMM/D/ YVY)DATUE(MMMIDIEXPNVYY r►N LIMITS ' A GENERALLIABIUTY DTCO5463B140TLCO9 2/4/2009 2/4/2010 EACH OCCURRENCE $ 1,000,000 COMMERCIAL GENERAL LIABILITY PREMISES(EO aoccurDence) $ 300,000 CLAIMS MADE X OCCUR MEDEXP(Any oneperson) $ 5,000 PERSONAL BADVINJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 ` GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 — POLICY r!'i 9T [1 LOC B AUTOMOBILELIABILITY BA2980N48609CNS 2/4/2009 2/4/2010 COMBINED SINGLE LIMIT $ 1,000,000 X ANY AUTO (Ea accident) t) ALL OWNED AUTOS BODILY INJURY _ SCHEDULED AUTOS (Per person) § HIRED AUTOS BODILY INJURY ` (Per accident) $ NON-OWNED AUTOS I PROPERTY DAMAGE $ 1 (Per accident) GARAGEUABIUTY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ C EXCESSIUMBRELLAUABILITY DTSMCIIP5463B152TCTO9 2/4/2009 2/4/2010 EACH OCCURRENCE $ 1,000,000 X OCCUR CLAIMS MADE AGGREGATE $ 1,000,000 $ Illi DEDUCTIBLE $ X RETENTION $ 10,000 $ C WORKERS COMPENSATION DTEIIB5463B17609 2/4/2009 2/4/2010 X TORY LIMTIUTS OTH- ER AND EMPLOYERS'LIABILITY IN III ANY PROPRIETOR/PARTNER/EXECUTIVE N I EL EACH ACCIDENT $ 1,000,000 OFFIdtoryinNH) EXCLUDED? E.L.DISEASE-EA EMPLOYEE $ 1,000,000 ' (MandatoryinNH) If yes,describe under SPECIAL PROVISIONS below EL DISEASE-POUCY LIMIT $ 1,000,000 OTHER III DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS AM RE: Water Lights WS&D project ' Additional Insured (except for WC) in favor of City of Pearland and LJA Engineering & Surveying, Inc. as required by written contract. - CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION 71 DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR City of Pearland I. C/o LJA Engineering & Surveying, Inc. REPRESENTATIVES. 5959 Corporate Drive, Suite 3500 ORDEDREP E' P. Houston, TX 77036 . � - ACORD 25(2009/01) Co11:2707456 Tp1:903063 Cert:12568676 ©1988-2001 CORD CORPORATION.All rights reserved. lII The ACORD name and logo are registered marks of ACORD Page 2 of 2 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER This Certificate of Insurance does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. -14 ACORD 25(2009/01) Co11:2707456 Tp1:903063 Cert:12568676 • Section 00615 PARTIAL WAIVER OF LIEN AND PAYMENT AFFIDAVIT The undersigned contracted with City of Pearland to furnish Water, Sanitary Sewer and Drainage Facilities in connection with certain improvements to real property located in the City of Pearland, TX and owned by the City of Pearland which improvements are described as follows: Water, Sanitary Sewer and Drainage Facilities to Serve Water Lights. In consideration of Pay Estimate No. in the amount of$ the undersigned, on oath, states that all persons and firms who supplied labor and materials to the undersigned in connection with said Project have been fully paid by the undersigned for such work through In consideration of the payment herewith made,the undersigned does fully and finally release and hold harmless the City of Pearland and its surety, if any, through the above date from any and all claims, liens, or right to claim or lien, arising out of this Project under any applicable bond, law or statue. It is understood that this affidavit is submitted to induce payment of the above sum and for use by the City of Pearland in assuring the Owner and others that all liens and claims relating to the said Project furnished by the undersigned are paid. Signature Miguel Hurtado, President Printed Name&Title Hurtado Construction Company Company Name State of County of Subscribed and sworn to, before me,this day of 20 My Commission Expires: Notary Public E Revised 12/31/07 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Section 00700 GENERAL CONDITIONS OF AGREEMENT TABLE OF CONTENTS Page No. r 1.0 DEFINITIONS AND INTERPRETATIONS 1 1.01 Owner, Contractor and Engineer 1 1.02 Contract Documents 1 1.03 Subcontractor 2 1.04 Written Notice 2 1.05 Work 2 1.06 Extra Work 2 1.07 Work Day 1.07-1 Rain Day 1.07-2 Weather Day 1.08 Calendar Day 2 1.09 Substantially Completed 3 1.10 Interpretation of Words and Phrases 3 1.11 Referenced Standards 1.12 Contract Time 3 2.0 RIGHTS AND RESPONSIBILITIES OF THE OWNER 3 2.01 Adequacy of Design 3 2.02 Right of Entry 4 2.03 Ownership of Drawings 4 2.04 Changes and Alterations 4 2.05 Damages 4 05/2007 00700-i 7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT E3.0 RIGHTS AND RESPONSIBILITIES OF THE ENGINEER 5 3.01 Owner-Engineer Relationship 5 7 3.02 Keeping of Plans and Specifications Accessible 5 7 3.03 Preliminary Approval 5 3.04 Inspection by Engineer 6 C3.05 Determination of Questions and Disputes 6 7 3.06 Recommendation of Payment 6 4.0 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR 7 C4.01 Independent Contractor 7 7 4.02 Contractor's Understanding 7 4.03 Laws and Ordinances 7 7 4.04 Assignment and Subletting 8 7 4.05 Performance and Payment Bonds 8 4.06 Insurance 8 7 4.07 Permits and Fees 8 L 4.08 Texas State Sales Tax 9 4.09 Contractor's Duty and Superintendence 9 7 4.10 Character of Workers 9 7 4.11 Labor, Equipment, Materials, Construction Plant and Buildings 9 7 4.12 Sanitation 10 4.13 Cleaning and Maintenance 10 7 4.14 Performance of Work 10 C4,15 Right of Owner to Accelerate the Work 10 4.16 Layout of Work 10 7 4.17 Shop Drawings 10 05/2007 00700-ii 7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.18 Engineer-Contractor Relationship; Observations 11 4.19 Observation and Testing 11 4.20 Defects and Their Remedies 12 4.21 Liability for Proper Performance 12 4.22 Protection Against Accident To Employees and the Public 13 4.23 Protection of Adjoining Property 14 4.24 Protection against Claims of Subcontractors, Laborers,Materialmen, and Furnishers of Machinery and Supplies 14 4.25 Protection Against Royalties or Patented Invention 15 4.26 Indemnification 15 4.27 Losses From Natural Causes 16 4.28 Guarantee 16 5.0 PROSECUTION AND PROGRESS 17 5.01 Time and Order of Completion 17 5.02 Extension of Time 17 5.03 Hindrances and Delays 18 5.04 Suspension of Work 18 5.05 Liquidated Damages for Delay 5.06 Change of Contract Time 5.07 Delays Beyond Owner's and Contractor's Control 18 Y Y 6.0 MEASUREMENT AND PAYMENT 19 6.01 Discrepancies and Omissions 19 6.02 Quantities and Measurements 19 6.03 Estimated Quantities 19 6.04 Price of Work 19 05/2007 00700-iii ECITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 7 6.05 Payments 20 76.06 Partial Payments 20 6.07 Use of Completed Portions &Punchlist 21 7 6.08 Final Payment 22 6.09 Correction of Work Before Final Payment 23 7 6.10 Correction of Work After Final Payment 23 7 6.11 Payments Withheld 23 L 6.12 Delayed Payments 24 7 7.0 EXTRA WORK AND CLAIMS 24 7 7.01 Change Orders 24 7.02 Minor Changes 25 r L 7.03 Extra Work 25 C7.04 Time of Filing Claims 26 8.0 DEFAULT 27 C8.01 Default by Contractor 27 L 8.02 Supplementation of Contractor Forces 29 8.03 Cumulative Remedies & Specific Performance 29 7 8.04 Cross-Default 29 7 8.05 Insolvency 29 El 8.06 Contingent Assignment 30 8.07 Waiver of Consequential Damages 30 C8.08 Termination for Convenience 30 7 8.09 Default by Owner 31 9.0 DISPUTE RESOLUTION 31 7 ATTACHMENT NO. 1: WORKERS' COMPENSATION INSURANCE COVERAGE Al 05/2007 00700-iv 7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ATTACHMENT N0. 2: AGREEMENT FOR FINAL PAYMENT AND CONTRACTOR'S SWORN RELEASE B1 CATTACHMENT NO. 3: OWNER'S INSURANCE REQUIREMENTS OF CONTRACTOR Cl r r C C 05/2007 00700-v r CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Section 00700 GENERAL CONDITIONS OF AGREEMENT 1.0 DEFINITIONS AND INTERPRETATIONS 1.01 OWNER, CONTRACTOR AND ENGINEER. The OWNER, the CONTRACTOR and the ENGINEER are those persons or organizations identified as such in the Agreement. The term ENGINEER as used in these General Conditions shall refer to the Engineer or Architect identified in the Agreement, as applicable, and means a person authorized to act as a representative of the entity designated by the OWNER to provide professional services required in connection with the preparation and performance of this Contract. The Owner's representative on the project site shall be the Construction Manager or Engineer as designated. L' 1.02 CONTRACT DOCUMENTS. The Contract Documents shall consist of all of the documents identified in Article 8 of the Standard Form of Agreement, which documents, excluding the Plans and such documents as may be delivered or issued after the Effective Date of the Agreement, as referenced in Article 8, shall be bound together in a Project Manual for the Work. All references to the "Contract" or the "Agreement" in these General Conditions of Agreement shall include the Contract Documents. The Contract Documents are complementary, and what is required by one shall be binding as if required by all. In the event of any conflict among the Contract Documents, the Contract Documents shall govern in the following order: (1) Modifications in writing and signed by both parties, including any Change Orders; (2) Standard Form of Agreement; (3) Special Conditions of Agreement; (4) General Conditions of Agreement, including Attachment No. 1 — Workers' Compensation Insurance Coverage, Attachment No. 2 — Agreement for Final Payment and CONTRACTOR'S Sworn Release, and Attachment No. 3 — Owner's Insurance Requirements of Contractor; (5) Addenda, if any; (6) Plans and Specifications referenced or included in the Project Manual; 7 Instructions to Bidders; (8) Bid Proposal; and (9) Exhibits: The following Exhibits, attached hereto, are incorporated herein, and are a part of this Contract: L 05/2008 00700- 1 of 36 7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT In the event a conflict or inconsistency remains between or within the Plans and Specifications or other Contract Documents, or the Contract Documents and applicable standards, codes and ordinances, CONTRACTOR shall provide the greater quantity or better quality, or CONTRACTOR shall comply with the more stringent requirements, as determined by ENGINEER Terms or phrases used in the Contract Documents with a well-known technical or construction industry meaning shall have such recognized meanings. References to standards, specifications, manuals or codes of any technical society, organization or association, or to the laws or regulations of any governmental authority, shall mean the latest in effect on the effective date of the Contract,unless otherwise stated in the Contract Documents. 1 .03 SUBCONTRACTOR. The term "subcontractor", as employed herein, includes those entities having a contract with the CONTRACTOR or a subcontractor for performance of work on the Project with a value meeting or exceeding 10% of the Contractor's TOTAL BASE BID for the work contemplated by these Contract Documents. OWNER shall have no responsibility to any subcontractor for performance of work on the Project contemplated by these Contract Documents, and any such subcontractor shall look exclusively to CONTRACTOR for any payments due subcontractor. ! 1.04 WRITTEN NOTICE. Written Notice shall be deemed to have been duly served if delivered in person to the individual or to a partner of the partnership or joint venture, or to an officer of the corporation or company for whom it is intended, or if delivered at or sent by Certified Mail, Return Receipt Requested, to the last known business address or registered office of such individual, partnership, joint venture or corporation or company, or to the address for giving notices listed in the Standard Form of Agreement. 1.05 WORK. Unless otherwise stipulated, the CONTRACTOR shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, services, insurance, and all water, light, power, fuel, transportation and all other facilities or services of any nature whatsoever necessary for the execution and completion of the Work described in the Standard Form of Agreement. Unless otherwise specified, all materials shall be new, and both workmanship and materials shall be of good quality. The CONTRACTOR shall, if required by the ENGINEER as representative of the OWNER, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well-known, technical or trade meaning shall be held to refer to such recognized standards. All work shall be done and all materials shall be furnished in strict conformity with the Contract Documents. 1.06 EXTRA WORK. The term "Extra Work", as used in this Contract, shall be understood to mean and include all work that may be required by the ENGINEER as representative of the OWNER, to be done by the CONTRACTOR to accomplish any change, alteration or addition to the work shown upon the plans. Extra work shall be authorized in writing by the ENGINEER prior to commencement. r E 05/2008 00700-2 of 36 Li CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 1.07 WORK DAY: As used herein, a "Work Day" is defined as any Monday through Friday, not a legal holiday, and any Saturday or Sunday specifically approved by the OWNER, in which the CONTRACTOR can perform six or more hours of work per the current construction schedule. CONTRACTOR agrees to request specific approval from the Construction Manager, in advance, to perform work on Saturdays or Sundays and in so doing agrees to pay all charges and costs for Inspection and or Construction Management services required during the performance of any such approved work. 1.07-1 RAIN DAY: As used herein, is defined as any WORK DAY during which weather related conditions prevent the CONTRACTOR from performing four (4) or more consecutive hours of work on critical path items as identified in the current construction schedule. CONTRACTOR shall record Rain Days on the Pay Application each month for the review and possible approval by the OWNER. The approved Rain Day is then added to the Contract Time. (See 1.12 Contract Time below) 1.07-2 IMPACT DAY: As used herein, is a day that is added to the CONTRACT TIME by the OWNER by Change Order to extend the Contract Time by one full Work Day. (See 1.12 Contract Time below) Impact Days, once approved by the OWNER, shall extend the Contract Time on a one-to-one basis to replace a Work Day lost to conditions that prevented the L CONTRACTOR from performing four 4 or more consecutive hours of work on critical path items. Impact Days are added to the Contract Time by Change Order only at the end of the work and then only if, in the opinion of the OWNER, a time extension is warranted due to delays beyond the control of the Contractor and required to complete the work within the Contract Time. 1.08 CALENDAR DAY. A "calendar day" is any day of the week, month, or year no days being excepted. Unless otherwise expressly provided, all references to "day(s)" shall mean calendar day(s). 1 .09 SUBSTANTIALLY COMPLETED: The terms "Substantially Completed", or "Substantially Complete" or "Substantial Completion" as used in this Contract, shall mean that all major process components of the facility or work have been made suitable for use or occupancy, including appropriate documentation from the equipment suppliers that all of the individual components have been installed in accordance with the specifications and manufacturer's recommendations, the installations have been approved by the ENGINEER and the items have met the start-up and testing requirements of the contract documents or is deemed to be in a condition to serve its intended purpose or requires only minor miscellaneous work and adjustment to achieve Final Completion and Acceptance as determined by the ENGINEER. Upon compliance with the above referenced criteria, ENGINEER shall issue a Certificate of Substantial Completion. PARTIAL SUBSTANTIAL COMPLETION: designation will be given on components of the Work that must be placed into service prior to the completion of the entire Work. The contractor's One Year Warranty period for these items shall begin on the date of Partial Substantial Completion as designated by the ENGINEER. The ENGINEER shall determine and make all such designations. 05/2008 00700-3 of 36 E CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 1.10 INTERPRETATION OF WORDS AND PHRASES. Whenever the words "directed", "permitted", "designated", "required", "ordered", "considered necessary", "prescribed" or words of like import are used, it shall be understood that the direction,requirement,permission, order, opinion designation or prescription of the ENGINEER as the OWNER's representative is intended. Similarly, the words "approved", "acceptable", "satisfactory" or words of like import shall mean that no exception is taken by ENGINEER, but does not relieve CONTRACTOR of responsibility for compliance with the Contract Documents. Whenever in the Specifications or Drawings of the Contract Documents, the terms of description of various qualities relative to finish, workmanship or other qualities of similar kind which cannot, from their nature, be specifically and clearly described and specified, but are necessarily described in general terms, the fulfillment of which must depend on individual judgment, then, in all such cases, any question of the fulfillment of said Specifications shall be decided by the ENGINEER as the OWNER's representative, and said work shall be done in accordance with his interpretations of the meaning of the words,terms or clauses defining the character of the work. 1.11 REFERENCED STANDARDS. No provision of any referenced standard specification, or manual shall be effective to change the duties and responsibilities of the Owner, Engineer, Contractor, or their consultants, employees, or representatives from those set forth in the Contract Documents, nor shall it be effective to assign to the Engineer or its consultants, employees, or representatives any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undertake responsibilities contrary to provisions of the Contract Documents. 1.12 CONTRACT TIME The term Contract Time as used herein, refers to the number of Calendar days provided to complete the work or the date, stated in the Agreement: (i)to achieve Substantial Completion, and (ii) to complete the Work so that it is ready for final payment as evidenced by ENGINEER's written recommendation of final payment in accordance with Paragraph 6.09 and as modified as a result of any authorized Extensions. The established Contract Time includes 40 Rain Days per year, based on the average number of rain days per year for the period of June 1898 to December 1996 as recorded by the Alvin Weather Center Record. The Contract Time shall only be extended by (a) the addition of Rain Days equal to the number of actual Rain Days in excess of 40 days per year and (b) the number of Impact Days granted for delays, in the opinion of the Owner, beyond the control of the Contractor. The extension of the Contract Time shall be the CONTRACTOR's sole and exclusive remedy for delays. E 05/2008 00700-4 of 36 E CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 2.0 RIGHTS AND RESPONSIBILITIES OF THE OWNER 2.01 NO WARRANTY OF DESIGN. It is understood that the OWNER MAKES NO WARRANTY OF THE ADEQUACY, ACCURACY OR SUFFICIENCY OF THE PLANS AND SPECIFICATIONS OR ANY OTHER DESIGN DOCUMENTS, AND OWNER HEREBY EXPRESSLY DISCLAIMS ANY SUCH WARRANTY, EXPRESSED OR IMPLIED. Prior to C commencing each portion of the Work, CONTRACTOR shall carefully study and compare the relevant Contract Documents, shall observe conditions at the site affecting the Work, and shall take field measurements of existing conditions related to the Work. Any errors, omissions or inconsistencies in the Contract Documents noted by the CONTRACTOR, and/or any variance between the Contract Documents and applicable codes, standards or ordinances, shall be promptly reported by CONTRACTOR to ENGINEER in writing as a Request for Information. CONTRACTOR shall not proceed with the affected portion of the Work until it receives ENGINEER's written response to such Request for Information, and then only in accordance with ENGINEER's response. If CONTRACTOR fails to perform its obligations under this paragraph, CONTRACTOR shall pay such costs and damages to OWNER as would have been avoided if CONTRACTOR had reported any errors, omissions, inconsistencies or variances in the Contract Documents noted by CONTRACTOR or which should have been noted by a careful study of the Contract Documents. CONTRACTOR shall comply with the Contract Documents, all approved modifications thereof and additions and alterations thereto approved in writing by the OWNER. The burden of proof of such compliance shall be upon the CONTRACTOR to show that he has complied with the requirements of the Contract Documents and approved modifications thereof and all approved additions and alterations, thereto, as the same shall have been interpreted by the ENGINEER. 2.02 RIGHT OF ENTRY. The OWNER reserves the right to enter the property or location on which the work herein contracted for is to be performed, constructed or installed, for itself or such agent or agents as it may select, for the purpose of inspecting the work, or for the purpose of performing, constructing or installing such collateral work as the OWNER may desire. The OWNER shall have the right to make inspections at all reasonable times, and the CONTRACTOR hereby waives any claims for extension of time and/or compensation for any loss or damage if his work shall be delayed by reason of such inspection, performance, construction or installation of collateral work. 2.03 OWNERSHIP OF DRAWINGS. All drawings, specifications and copies thereof p furnished by the OWNER shall not be reused on other work and, with the exception of the sets forming the part of the signed Contract Documents, are to be returned to the OWNER on request at the completion of the Work. All drawings and models are the property of the OWNER. 2.04 CHANGES AND ALTERATIONS. The CONTRACTOR further agrees that the Owner may make such changes and alterations, additions and deletions as the OWNER may see fit, in the Work, including but not limited to changes in line, grade, form, dimensions, plans or specifications for the Work herein contemplated, or any part thereof, either before or after the beginning of construction, without affecting the validity of this Contract and the corresponding Performance and Payment Bonds. 05/2008 00700-5 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT If such changes or alterations or deletions diminish the quantity or the value of the Work to be done, they shall not constitute the basis for a claim for compensation or damages, including lost or anticipated profits on the Work that may be affected. If the amount of Work is increased and the work can fairly be classified under the specifications, such increase shall be paid for according to the quantity actually done and at the unit price, if any, established for such work under this Contract, otherwise, such additional work shall be paid for as provided under Article 7 hereof for Extra Work. In case the OWNER shall make such changes or alterations as shall make useless C any Work already done or material already furnished or used in said Work, then the OWNER shall compensate the CONTRACTOR for any material or labor so used and for any actual loss occasioned by such change due to actual expenses incurred in preparation for the Work as originally planned. 2.05 DAMAGES. In the event the OWNER is damaged in the course of the work by the act, negligence, omission, mistake or default of the CONTRACTOR, or should the CONTRACTOR unreasonably delay the progress of the work being done by others on the job so as to cause loss for which the OWNER becomes liable, then the CONTRACTOR shall reimburse the OWNER for such loss. 3.0 RIGHTS AND RESPONSIBILITIES OF THE ENGINEER L 3.01 OWNER-ENGINEER RELATIONSHIP. The ENGINEER shall serve as the OWNER'S representative during construction. The duties, responsibilities and limitations on the authority of the ENGINEER as the OWNER's representative during construction are set forth in the Contract Documents; and the ENGINEER shall not have authority to extend the OWNER's liability or to bind the OWNER for any additional liability of any nature whatsoever without the written consent of the OWNER. Any communications by the OWNER to the CONTRACTOR regarding the Work shall be issued through the ENGINEER. It is the intent of this Agreement that there shall be no delay in the execution of the Work; therefore, written decisions or directions rendered by the ENGINEER as the OWNER's representative shall be promptly carried out, and any claim arising therefrom shall be resolved as provided in Article 7. Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the ENGINEER shall have the authority to issue written stop work orders whenever such stoppage may be necessary to insure the performance of the Work in accordance with the Contract Documents. 3.02 KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE. The ENGINEER shall furnish the CONTRACTOR with four (4) copies of all Plans and Specifications without expense to the CONTRACTOR, and the CONTRACTOR shall keep one full size copy of the same constantly accessible on the job site, with the latest revisions noted thereon. The CONTRACTOR shall be responsible for preserving the Plans and Specifications, timely and accurately updated, for reference and review by the OWNER or the ENGINEER and submittal of redlines during closeout. E E 05/2008 00700-6 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 3.03 PRELIMINARY APPROVAL. The ENGINEER shall not have the power to waive the obligations imposed under this Contract for the furnishing by the CONTRACTOR of new material of good quality, and for good and workmanlike performance of the Work as herein described, and in full accordance with the Contract Documents, without alteration, deletion or change. No failure or omission of the ENGINEER to discover, object to or condemn any non- conforming or defective work or material, or to stop work, shall release the CONTRACTOR from the obligation to fully and properly perform the Contract, including without limitation, the obligation to at once tear out, remove and properly replace any defective work or material at any time prior to final acceptance, upon discovery of such non-conforming or defective work or material. Any questioned Work may be ordered taken up or removed for inspection by the ENGINEER prior to final acceptance, and if found not to be in accordance with the Contract Documents, all expense of removing, inspection and repair or replacement shall be borne by the CONTRACTOR; otherwise the expense thus incurred shall be allowed as Extra Work and shall be paid for by the OWNER, provided that where inspection or approval is specifically required by the Specifications L' prior to performance of certain work, should the CONTRACTOR proceed with such work without requesting prior inspection or approval, he shall bear all expense of taking up, removing and replacing this work if so directed by the ENGINEER. 3.04 INSPECTION BY ENGINEER. The ENGINEER shall make periodic visits to the site to observe the progress and quality of the executed Work and to determine if such Work generally meets the essential performance and design features and the technical, functional mid/or engineering requirements of the Contract Documents, and is in all other respects being performed in compliance with the Contract Documents. However, the ENGINEER shall not be responsible for making any detailed, exhaustive, comprehensive or continuous on-site inspections to check the quality and/or quantity of the work, nor shall the ENGINEER be in any way responsible, directly or indirectly, for the construction means, methods, techniques, sequences, quality, procedures, programs, safety precautions or lack of same incident to the Work being performed or any part thereof. The ENGINEER shall use reasonable care to prevent deviation from the intent and substance of the Contract Documents by the CONTRACTOR in the performance of the Work and any part thereof and, on the basis of such on-site observations, will keep the OWNER informed of the progress of the work and will endeavor to guard the OWNER against defects and deficiencies in the Work of the CONTRACTOR. Notwithstanding any other provision of this Agreement or any other Contract Document, the ENGINEER shall not be in any way responsible or liable for any acts, errors, omissions or negligence of the CONTRACTOR, any subcontractors, agents, servants or employees or any other person, firm or corporation performing or attempting to perform any of the Work. E E 05/2008 00700-7 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 3.05 DETERMINATION OF QUESTIONS AND DISPUTES. In order to prevent delays and disputes and to discourage litigation, it is agreed that the ENGINEER shall, in all cases, determine the quantities and qualities of the several kinds of Work, which are to be paid for under this Contract. The ENGINEER shall determine all questions in relation to said Work and the construction thereof, as well as all claims, disputes and other matters in question between the CONTRACTOR and the OWNER relating to the execution or progress of the Work or the interpretation of the Contract Documents. In the event the ENGINEER shall become aware of or shall receive information that there is a dispute or a possible dispute as to the reasonable interpretation of the terms and conditions of the Contract Documents, or any other dispute or question, the ENGINEER shall, within a reasonable time, provide a written interpretation of the Contract Documents or a written decision on all questions arising relative to the execution of the Work, copies of which shall be delivered to all parties to the Contract. If the CONTRACTOR or OWNER desires to take exception to any directions, order, interpretation or instructions of the ENGINEER, CONTRACTOR or OWNER shall present any such claim to the ENGINEER in accordance with the provisions of Section 7.04. 3.06 RECOMMENDATION OF PAYMENT. The ENGINEER shall review the CONTRACTOR's application for payment and supporting documents, shall determine the amount C owed to the CONTRACTOR and shall provide written recommendation to the OWNER for payment to the CONTRACTOR in such amount. Such recommendation of payment to CONTRACTOR shall constitute a representation to the OWNER of the ENGINEER's judgment C that the work has progressed to the point indicated, to the best of his knowledge, information and belief; however, such recommendation of an application for payment to CONTRACTOR shall not be deemed an acceptance of any defective or non-conforming Work. Any recommendation of payment by the ENGINEER shall be subject to OWNER's rights to withhold payment under Section 6.11 and as otherwise provided in the Contract. 4.0 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR 4.01 INDEPENDENT CONTRACTOR. CONTRACTOR is, and shall remain, an independent contractor, solely responsible for the manner and method of completing the Work under this Contract, with full and exclusive power and authority to direct, supervise and control his own employees and to determine the means, method and manner of performing such Work, so long as such methods comply with the requirements of the Contract Documents, and do not adversely affect the completed improvements or any other property abutting or adjoining the Work area, the OWNER and ENGINEER being interested only in the result obtained and conformity of such completed improvements to the Plans, Specifications and Contract Documents. The fact that the OWNER or ENGINEER as the Owner's representative shall have the right to observe CONTRACTOR's work during his performance and to carry out the other prerogatives which are expressly reserved to and vested in the OWNER and the ENGINEER hereunder, is not intended to and shall not at any time change or affect the status of the CONTRACTOR as an independent contractor with respect to either the OWNER or the ENGINEER as the OWNER's representative or to the CONTRACTOR's own employees or to any other person, firm or corporation. 05/2008 00700-8 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.02 CONTRACTOR'S UNDERSTANDING. It is understood and agreed that the CONTRACTOR has, by careful examination, satisfied himself as to the nature and location of the Work, the conformation of the ground, the character, quality and quantity of the materials to be r! encountered, the character of equipment and facilities needed preliminary to and during the L prosecution of the Work, the general and local conditions, including but not limited to weather, access, lay down and storage areas, and all other matters which in any way affect the Work under this Contract. It is further understood that the CONTRACTOR has satisfied himself as to the terms, meaning, intent and requirements of all of the Contract Documents, and applicable laws, codes, regulations and ordinances. CONTRACTOR hereby warrants and represents that it has taken into consideration all of the foregoing factors, and CONTRACTOR shall perform the Work for the Contract Price and within the Contract Time. No verbal agreement or conversation with any officer, agent or employee of the OWNER or the ENGINEER, either before or after the execution of this Contract, shall affect or modify any of the terms or obligations herein contained. 4.03 LAWS AND ORDINANCES. The CONTRACTOR shall at all times observe and comply with all federal, state or local laws, codes, ordinances, permits and regulations, regardless of whether the same are adopted before or after the execution of this Contract, which in any manner affect the Contract or the work, and shall indemnify, save and hold harmless the OWNER and the ENGINEER against any claim arising out of the violation of any such laws, ordinances and regulations, whether by the CONTRACTOR or his agents, employees, subcontractors or vendors. If the CONTRACTOR observes that the Plans and Specifications are at variance with federal or state laws or codes or the ordinances or regulations of the City, he shall promptly notify the ENGINEER in writing, and any necessary changes shall be made as provided in the Contract for changes in the work. If the CONTRACTOR performs any work knowing it to be contrary to such laws, codes, ordinances, rules or regulations, or if CONTRACTOR reasonably should have known of any such violation, and without such notice to the ENGINEER, CONTRACTOR shall bear all costs arising therefrom. The OWNER is a Political Subdivision of the State of Texas, and the law from which it derives its powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions under which the OWNER may enter into contracts, shall be controlling and shall be considered as part of this Contract to the same effect as though embodied herein. Neither the act of OWNER entering into this Contract, nor OWNER's performance hereunder, shall constitute a waiver of any immunity from.suit enjoyed by OWNER under applicable law, all such rights and defenses being hereby expressly reserved, notwithstanding any term or provision herein to the contrary. The Code of Ordinances and other applicable regulations of the OWNER shall be deemed to be embodied in this Contract. The prevailing wage rates applicable to this Project shall be either Document 00811 —Wage E. Scale for Engineering Construction, or Document 00813 — Wage Scale for Building Construction, or both, as set out in the Project Manual. r L r 05/2008 00700-9 of 36 E CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.04 ASSIGNMENT AND SUBLETTING. The CONTRACTOR further agrees that he L. will retain personal control and will give his personal attention to the fulfillment of this Contract and that he will not assign, by power of attorney or otherwise, or sublet said Contract, or any rights, duties or obligations arising thereunder, in whole or in part, without the prior written consent of the OWNER, and that no part or feature of the Work will be sublet to anyone objectionable to the ENGINEER or the OWNER. In addition, the OWNER reserves the right to disapprove the subletting of this Contract or any portion hereof on any basis whatsoever. The CONTRACTOR further agrees that the subletting of any portion or feature of the Work or materials required in the performance of this Contract shall not relieve the CONTRACTOR from his obligations to the OWNER, as provided for by this Agreement. 4.05 PERFORMANCE, PAYMENT AND MAINTENANCE BONDS. In the event the Contract Price shall be in excess of $25,000.00, the CONTRACTOR shall execute separate Performance,Payment and Maintenance Bonds, each in the sum of one hundred percent(100%) of the Contract Price, and each in accordance with the provisions of Chapter 2253 of the Texas Government Code. If the Contract Price does not exceed $25,000.00, the statutory bonds will not L be required. All required Bonds shall be payable to OWNER and on forms approved by the OWNER, and shall be executed by a corporate surety in accordance with Article 7.19-1 of the Texas Insurance Code. It is agreed that the Contract shall not be in effect until such original Performance, Payment and Maintenance Bonds are delivered to and approved by the OWNER. The cost of the premium for the Performance, Payment and Maintenance Bonds shall be included in the CONTRACTOR's Bid Proposal. 4.06 INSURANCE. The CONTRACTOR, at his own expense, shall procure, maintain and keep in force throughout the duration of the Work, and throughout the Guarantee Period, insurance as specified in Attachment No. 1 hereto with regard to Workers' Compensation Insurance, and as specified in Attachment No. 3 hereto with regard to all other Insurance. Such insurance shall be carried with an insurance company licensed to transact business in the State of Texas and shall cover all operations in connection with this Contract, whether performed by the CONTRACTOR or a subcontractor, or others for whom CONTRACTOR is responsible. 4.07 PERMITS AND FEES. Unless otherwise provided in the Contract Documents,the Contractor shall secure and pay for all permits, licenses, and inspections necessary for proper execution and completion of the Work, and which are legally required at the time bids are received. Permits required by the City of Pearland will be issued as a NO FEE permit. 4.08 TEXAS STATE SALES TAX. Materials incorporated into this project are exempt from State Sales according to provisions of the Texas Tax Code, Chapter 151, Subsection H. The Contractor must obtain a limited sales, excise and use tax permit or exemption certificate which shall enable him to buy the materials to be incorporated into the Work without paying tax at due time of purchase. 05/2008 00700- 10 of 36 E CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.09 CONTRACTOR'S DUTY AND SUPERINTENDENCE. The CONTRACTOR shall give adequate attention to the faithful prosecution and completion of this Contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to the ENGINEER as the OWNER'S representative. The superintendent shall represent the CONTRACTOR in his absence and shall act as the agent of the CONTRACTOR, and all directions given to him shall be binding as if given to the CONTRACTOR. Adequate supervision by competent and reasonable representatives of the CONTRACTOR is essential to the proper performance of the Work, and lack of such supervision shall be an act of default, and grounds for suspending operations of the CONTRACTOR. [1-1 The Work, from its commencement to completion, shall be under the exclusive charge and control of the CONTRACTOR, and all risk in connection therewith shall be borne by the CONTRACTOR. Neither the OWNER nor the ENGINEER as the OWNER's representative will be responsible for the acts or omissions of the CONTRACTOR, its subcontractors or any of its agents or employees, or any other persons performing any of the Work. 4.10 CHARACTER OF WORKERS. The CONTRACTOR agrees to employ only orderly and competent workers, skillful in the performance of the type of work required under this Contract, to do the Work, and agrees that whenever the ENGINEER shall inform him in writing that any worker or workers on the Work are, in his opinion, incompetent, unfaithful or disorderly, or in the ENGINEER's opinion, are not using their best efforts for the progress of the Work, such worker or workers shall be discharged from the Work and shall not again be employed on the Work without the ENGINEER's written consent. OWNER reserves the right to object to any proposed subcontractor. 4.11 LABOR, EQUIPMENT, MATERIALS, CONSTRUCTION PLANT, AND BUILDINGS. The CONTRACTOR shall provide all labor, services, tools, equipment, machinery, supplies, facilities, utilities and materials necessary in the prosecution and completion of this Contract where it is not otherwise specifically provided that the OWNER shall furnish same; and further, the CONTRACTOR shall be responsible for the care, preservation, conservation and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, all means of construction and any and all parts of the Work, whether the CONTRACTOR has been paid, partially paid or not paid for such Work, until the entire Work is completed and accepted. The building or placement of structures for housing workers or offices, or the erection of tents or other forms of protection, will be permitted only with the ENGINEER's written permission, and at such places as the ENGINEER shall direct, and the sanitary conditions of the grounds in or about such structures shall at all times be maintained in a manner satisfactory to the ENGINEER. Any structures of any nature constructed, placed or erected by the CONTRACTOR for the purposes C herein set out, shall be the sole responsibility of the CONTRACTOR as to the proper erection, placement or construction thereof; and the CONTRACTOR agrees to indemnify and hold the ENGINEER or OWNER harmless from any claims of any nature whatsoever brought against either of them for damages allegedly sustained by anyone by reason of the erection, placement, construction or maintenance of CONTRACTOR's buildings or structures. E 05/2008 00700- 11 of 36 E CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.12 SANITATION.Necessary sanitary conveniences for the use of laborers and others on the Work site, properly secluded from public observation, shall be constructed and maintained by the CONTRACTOR in such manner and at such points as shall be approved by the ENGINEER, and their use shall be strictly enforced. Any structures of any nature constructed or erected by the CONTRACTOR for the purposes herein set out, shall be the sole responsibility of the CONTRACTOR as to the proper erection or construction thereof, and the CONTRACTOR agrees to indemnify and hold the ENGINEER and OWNER harmless from any claims of any nature whatsoever brought against either of them for damages allegedly sustained by anyone by reason of the erection, construction or maintenance of CONTRACTOR's buildings. L' 4.13 CLEANING AND MAINTENANCE. The CONTRACTOR shall at all times keep and maintain the premises free from accumulation of debris, trash and waste, and at the completion of the Work, he shall remove all such debris, trash and waste, and also his tools, scaffolding and surplus materials, and shall leave the Work broom-clean or its equivalent. The Work shall be left in good order and condition. In case of dispute, the OWNER may remove the debris, trash, waste and surplus materials, and charge the cost to the CONTRACTOR. 4.14 PERFORMANCE OF WORK. It is further agreed that it is the intent of this Contract that all Work must be done and all material must be furnished in accordance with the L generally accepted practice for such materials furnished or work completed, unless otherwise provided in the Contract Documents. 4.15 RIGHT OF OWNER TO ACCELERATE THE WORK. If at any time the methods or equipment used by the CONTRACTOR, or the work force supplied are found to be inadequate to achieve the progress required to Substantially Complete the Work within the Contract Time, the OWNER or the ENGINEER as the OWNER's representative, may order the CONTRACTOR in writing to supplement its forces and/or equipment, or work shifts or overtime, or otherwise improve its efficiency and rate of progress to achieve Substantial Completion of the Work within the Contract Time, and the CONTRACTOR shall comply with such order, at its own cost and expense. 4.16 LAYOUT OF WORK. Except as specifically provided herein, the P p Y CONTRACTOR shall be responsible for laying out work and shall accomplish this work in a manner acceptable to the ENGINEER and in conformance with the Contract Documents. 4.17 SHOP DRAWINGS. The CONTRACTOR shall submit to the ENGINEER, with such promptness as to cause no delay in his own Work or in that of any other contractor, six (6) checked copies, unless otherwise specified, of all shop and/or setting drawings and schedules required for the work of the various trades. Contractor will check and approve shop drawings for compliance with requirements of Contract Documents and will so certify by stamp on each drawing prior to submittal to ENGINEER. Any drawings submitted without Contractor's stamp p of approval will not be considered and will be returned to him for proper submission. The ENGINEER shall pass upon them with reasonable promptness, indicating desired corrections. E 05/2008 00700- 12 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT The CONTRACTOR shall make any corrections required by the ENGINEER, file with him two (2) corrected copies and furnish such other copies as may be needed. The ENGINEER's approval of such drawings or schedules shall not relieve the CONTRACTOR from responsibility for deviations from the Contract Documents, unless he has, in writing, called the ENGINEER's attention to such deviations at the time of the submission, and the ENGINEER has acknowledged and accepted such deviations in writing, nor shall it relieve him from responsibility for errors of any sort in shop drawings or schedules. It shall be the CONTRACTOR's responsibility to fully and completely review all shop drawings to ascertain their effect on his ability to perform the required Contract Work in accordance with the Plans and Specifications and Contract Documents, and within the Contract Time. Such review by the ENGINEER shall be for the sole purpose of determining the apparent sufficiency of said drawings or schedules to result in finished improvements in conformity with the Plans and Specifications and Contract Documents, and shall not relieve the CONTRACTOR of his duty as an independent contractor as previously set forth, it being expressly understood and agreed that the ENGINEER does not assume any duty to pass upon the propriety or adequacy of such drawings or schedules, or any means or methods reflected thereby, in relation to the safety of either person or property during CONTRACTOR's performance hereunder, and any action taken by the ENGINEER shall not relieve the CONTRACTOR of his responsibility and liability to comply with the Contract Documents. 4.18 ENGINEER-CONTRACTOR RELATIONSHIP; OBSERVATIONS. It is agreed by the CONTRACTOR that the ENGINEER, as the OWNER's representative, shall be and is hereby authorized to appoint such subordinate engineers, representatives or observers as the said ENGINEER may from time to time deem proper to observe the materials furnished and the Work done under this Agreement. The CONTRACTOR shall furnish all reasonable aid and assistance required by the subordinate engineers, representatives or observers for the proper observation and examination of the work. The CONTRACTOR shall regard and obey the directions and instructions of any subordinate engineers, representatives or observers so appointed, when such directions and instructions are consistent with the obligations of this Agreement and the Plans and Specifications and Contract Documents, provided, however, should the CONTRACTOR object to any orders by any subordinate engineer, representative or observer, the CONTRACTOR may, within three (3) days,make written appeal to the ENGINEER for his decision. 4.19 OBSERVATION AND TESTING. The OWNER or the ENGINEER as the OWNER's representative shall have the right at all reasonable times to observe, inspect and test the Work. The CONTRACTOR shall make all necessary arrangements and provide proper facilities and access for such observation, inspection and testing at any location wherever Work is in preparation or progress. The CONTRACTOR shall ascertain the scope of any observation, �! inspection or testing which may be contemplated by the OWNER or the ENGINEER and shall give ample notice as to the time each part of the Work will be ready for such observation, inspection or testing. The OWNER or the ENGINEER may reject any Work found to be defective or not in accordance with the Contract Documents, regardless of the stage of its completion or the time or place of discovery of such deficiencies, and regardless of whether the ENGINEER has previously accepted the Work through oversight or otherwise. If any Work is covered without approval or consent of the OWNER, it must, if requested by the OWNER or the ENGINEER, be uncovered for examination, at the sole expense of the CONTRACTOR. In the event that any part of the Work is being fabricated or manufactured at a location where it is not convenient for the OWNER or the ENGINEER to make observations of such Work or require testing of said Work, 05/2008 00700- 13 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT then in such event, the OWNER or the ENGINEER may require the CONTRACTOR to furnish the OWNER or the ENGINEER with certificates of inspection, testing or approval made by independent persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed C by the American Society for Testing and Materials or such other applicable organization as may be required by law or the Contract Documents. If any Work, which is required to be inspected, tested or approved, is covered up without written approval or consent of the OWNER or the ENGINEER, it must, if requested by the OWNER or the ENGINEER, be uncovered for observation and testing, at the sole expense of the CONTRACTOR. The cost of all such inspections, tests and approvals shall be borne by the CONTRACTOR unless otherwise provided herein. Any Work which fails to meet the c requirements of such tests, inspections or approval, and any Work which meets the requirements of any such tests or approval but does not meet the requirements of the Contract Documents shall be considered defective. Such defective Work and any other work affected thereby shall be corrected at the CONTRACTOR'S expense. Neither observations by the OWNER or by the ENGINEER, nor inspections, certifications, tests or approvals made by the OWNER, the ENGINEER or other persons authorized under this Agreement to make such inspections, tests or approvals, shall relieve the CONTRACTOR from his obligation to perform the Work in accordance with the requirements of the Contract Documents. 4.20 DEFECTS AND THEIR REMEDIES. It is further agreed that if the Work or any part thereof or any material brought on the site of the Work for use in the Work or selected for the same, shall be deemed by the ENGINEER as unsuitable or not in conformity with the Plans and Specifications or Contract Documents, the CONTRACTOR shall, after receipt of written notice thereof from the ENGINEER, forthwith remove such material and rebuild or otherwise remedy such Work so that it shall be in full accordance with this Contract, It is further agreed that any such remedial action contemplated herein shall be at CONTRACTOR's expense. 4.21 LIABILITY FOR PROPER PERFORMANCE. g Eng ineerin construction drawings and specifications, as well as any additional instructions and information concerning the Work to be performed, passing from or through the ENGINEER, shall not be interpreted as requiring or allowing the CONTRACTOR to deviate from the Plans and Specifications or the Contract Documents, the intent of such drawings, specifications and any other such instructions being to define with particularity the agreement of the parties as to Work the CONTRACTOR is to perform. CONTRACTOR shall be fully and completely liable and contractually bound, at his own expense, for design, construction, installation and use or non-use of all items and methods instant to the performance of the Contract, including, without limitation, the adequacy of all temporary supports, shoring, bracing, scaffolding, machinery or equipment, safety precautions or devices, similar items or devices used by him during construction, and work performed either directly or incident to construction, and for all loss, damage or injury incident thereto, either to person or property, whether such damage be suffered by the ENGINEER, the OWNER or any [14 other person not a party to this Contract. 05/2008 00700- 14 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Any review of Work in progress or any visit or observation during construction, or any clarification of Plans and Specifications or Contract Documents by the ENGINEER or OWNER, or any agent, employee or representative of either of them, whether through personal observation on the Project site or by means of approval of shop drawings for construction or construction processes, or by other means or methods, is agreed by the CONTRACTOR to be for the purpose of observing the extent and nature of Work completed or being performed, as measured against the Plans and Specifications and Contract Documents, or for the purpose of enabling the L CONTRACTOR to more fully understand the Plans and Specifications and Contract Documents so that the completed construction Work will conform thereto, and shall in no way relieve the CONTRACTOR from full and complete responsibility for proper performance of his Work on the Project, including, without limitation, the propriety of means and methods of the CONTRACTOR in performing said Contract, and the adequacy of any designs, plans or other facilities for accomplishing such performance. Any action by the ENGINEER or the OWNER in visiting or observing during construction, or any clarification of Plans and Specifications or Contract Documents shall not constitute a waiver of CONTRACTOR'S liability for damages as herein set out. Deviation by the CONTRACTOR from Plans and Specifications or Contract Documents, whether called to the CONTRACTOR's attention or not, shall in no way relieve CONTRACTOR from his responsibility to complete all work in accordance with said Plans and Specifications and Contract Documents, and further shall not relieve CONTRACTOR of his liability for loss, damage or injury as herein set out. 4.22 PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC. The CONTRACTOR shall be solely responsible for the safety of himself, his employees and all other persons, as well as for the protection of the improvements being erected and the property of himself or any other person, as a result of his operations hereunder. The CONTRACTOR shall take out and procure a policy or policies of Workers' Compensation Insurance with an insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workers' Compensation laws of the State of Texas. The CONTRACTOR shall at all times exercise reasonable precautions for the safety of employees and others on or near the Work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded, as a minimum, in accordance with the "Manual of Accident Prevention in Construction" of the Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The CONTRACTOR shall provide all necessary machinery guards, safe walkways, ladders, bridges, gangplanks, barricades, fences, traffic control, warning signs and other safety devices. No alcoholic beverages, non-prescription drugs, or unsafe practices will be allowed on the Work site. CONTRACTOR shall dismiss anyone participating in any of the above from the Work site for the duration of the Project. Only prescription drug uses with a doctor's authorization to perform construction activities will be allowed on the Work site. Violation of this provision is a default under the Contract. The use, possession, sale, transfer, purchase or being under the influence of alcohol, drugs or any other illegal or unlawful substance by CONTRACTOR or CONTRACTOR's employees, or CONTRACTOR's subcontractors and employees at any time at the Work site or while on company business is prohibited. CONTRACTOR shall institute and enforce appropriate drug testing guidelines and program. E 05/2008 00700- 15 of 36 E CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT All accidents or injuries to CONTRACTOR's employees working on the job site must be reported verbally and in writing to the ENGINEER immediately, and within no more than eight(8)hours. The safety precautions actually taken and their adequacy shall be the sole responsibility of the CONTRACTOR, in his sole discretion as an independent contractor. Inclusion of this paragraph in the Agreement, as well as any notice which may be given by the OWNER or the ENGINEER as the OWNER's representative concerning omissions under thus paragraph as the Work progresses, are intended as reminders to the CONTRACTOR of his duty and shall not be construed as any assumption of duty to supervise safety precautions by either the CONTRACTOR or any of his subcontractors. 4.23 PROTECTION OF ADJOINING PROPERTY. The CONTRACTOR shall employ proper means to protect the adjacent or adjoining property or properties in any way L' encountered, which might be injured or seriously affected by any process of construction to be undertaken under this Agreement, from any damage or injury by reason of said process of construction; and he shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent or adjoining property. THE CONTRACTOR AGREES TO INDEMNIFY, DEFEND, SAVE AND HOLD HARMLESS THE OWNER AND ENGINEER AGAINST ANY CLAIM OR CLAIMS FOR DAMAGES, LOSS, COSTS OR EXPENSES, INCLUDING BUT NOT LIMITED TO ATTORNEY'S FEES, DUE TO ANY INJURY TO ANY ADJACENT OR ADJOINING PROPERTY, ARISING OR GROWING OUT OF THE PERFORMANCE OF THE CONTRACT, REGARDLESS OF WHETHER OR NOT SUCH DAMAGE, LOSS, COST OR EXPENSE IS CAUSED IN PART BY THE NEGLIGENCE, GROSS NEGLIGENCE OR STRICT LIABILITY OF OWNER AND/OR ENGINEER. 4.24 PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS, MATERIALMEN AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES. THE CONTRACTOR AGREES THAT HE WILL PROMPTLY PAY WHEN DUE, AND WILL INDEMNIFY, SAVE AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ALL CLAIMS GROWING OUT OF THE DEMANDS OF SUBCONTRACTORS, LABORERS, WORKERS, MECHANICS, MATERIALMEN AND FURNISHERS OF MACHINERY AND PARTS THEREOF, EQUIPMENT, POWER TOOLS AND ALL SUPPLIES, INCLUDING COMMISSARY, INCURRED IN THE FURTHERANCE OF THE PERFORMANCE OF THIS CONTRACT. When so desired by the OWNER, the CONTRACTOR shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. If the CONTRACTOR fails to do so, then the OWNER may, at the option of the OWNER, either pay directly any unpaid bills of which the OWNER has written notice, or withhold from the CONTRACTOR's unpaid compensation a sum of money deemed reasonably sufficient to liquidate any and all such claims until satisfactory evidence is furnished that all liabilities have been fully discharged, whereupon payments to the CONTRACTOR shall be resumed in full, in accordance with the terms of this Contract. Any and all communications between any parties under this paragraph shall be in writing. Nothing contained in this paragraph or this Agreement shall create, establish or impose any relationship, contractual or otherwise,between OWNER and any subcontractor, laborer or supplier of CONTRACTOR, nor shall it create, establish or impose any duty upon OWNER to pay or to see to the payment of any subcontractor, laborer or supplier of CONTRACTOR. L 05/2008 00700- 16 of 36 ECITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.25 PROTECTION AGAINST ROYALTIES OR PATENTED INVENTION. The f� CONTRACTOR shall pay all royalties and license fees and shall provide for the use of any design, device, material or process covered by letters patent or copyright, by suitable legal agreement with the patentee or owner thereof THE CONTRACTOR SHALL DEFEND ALL SUITS OR CLAIMS FOR INFRINGEMENT OF ANY PATENT OR COPYRIGHT AND SHALL INDEMNIFY, SAVE AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY LOSS OR LIABILITY ON ACCOUNT THEREOF, EXCEPT SUCH SUITS AND CLAIMS ARISING OUT OF A PARTICULAR DESIGN, DEVICE, MATERIAL OR PROCESS OR THE PRODUCT OF A PARTICULAR MANUFACTURER OR MANUFACTURERS SPECIFIED OR REQUIRED BY THE OWNER; PROVIDED, HOWEVER, IF CHOICE OF ALTERNATE DESIGN, DEVICE, MATERIAL OR PROCESS IS ALLOWED TO THE CONTRACTOR, OR IF CONTRACTOR KNEW OR SHOULD HAVE KNOWN OF THE PATENT OR COPYRIGHT AND FAILED TO PROMPTLY NOTIFY OWNER IN WRITING, THEN THE CONTRACTOR SHALL INDEMNIFY, DEFEND, SAVE AND HOLD THE OWNER HARMLESS FROM ANY LOSS OR LIABILITY ON ACCOUNT THEREOF. 4.26 INDEMNIFICATION. THE CONTRACTOR AGREES TO DEFEND, INDEMNIFY AND HOLD THE ENGINEER AND THE OWNER HARMLESS FROM ANY CLAIMS OR DEMANDS OF ANY NATURE WHATSOEVER MADE BY ANY EMPLOYEE, EMPLOYEES, AGENTS OR SUBCONTRACTORS OF CONTRACTOR, OR BY ANY UNION, TRADE ASSOCIATION, WORKER'S ASSOCIATION OR OTHER GROUPS, ASSOCIATIONS OR INDIVIDUALS, ALLEGEDLY REPRESENTING EMPLOYEES OF THE CONTRACTOR, IN ANY DISPUTE BETWEEN THE CONTRACTOR AND HIS EMPLOYEES, DIRECTLY OR INDIRECTLY INVOLVING, GROWING OUT OF OR ARISING FROM CLAIMS BY SUCH EMPLOYEES FOR WAGES, SALARY, COMPENSATION, BENEFITS, WORKING CONDITIONS OR ANY OTHER SIMILAR COMPLAINT OR CLAIM WHICH MAY BE MADE. THE CONTRACTOR, HIS SURETIES AND INSURANCE CARRIERS SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS THE OWNER AND THE ENGINEER AND THEIR RESPECTIVE OFFICERS, REPRESENTATIVES, AGENTS AND EMPLOYEES FROM AND AGAINST ALL DAMAGES, CLAIMS, LOSSES, DEMANDS, SUITS, LIABILITIES, JUDGMENTS AND COSTS OF ANY CHARACTER WHATSOEVER, INCLUDING REASONABLE ATTORNEY'S FEES AND EXPENSES, AND SHALL BE REQUIRED TO PAY ANY JUDGMENT THEREFOR, WITH COSTS, WHICH MAY BE OBTAINED AGAINST THE OWNER AND/OR THE ENGINEER OR ANY OF THEIR OFFICERS, REPRESENTATIVES, AGENTS OR EMPLOYEES, ARISING OUT OF OR RESULTING FROM OR ALLEGEDLY ARISING OUT OF OR RESULTING FROM THE PERFORMANCE OF THE WORK, PROVIDED THAT ANY SUCH DAMAGES, CLAIM, LOSS, DEMAND, SUIT, LIABILITY, JUDGMENT, COST OR EXPENSE: (A) ARISES OUT OF OR RESULTS FROM IN WHOLE OR IN PART, OR ALLEGEDLY ARISES OUT OF OR RESULTS FROM IN WHOLE OR IN PART, ANY BREACH OF THIS AGREEMENT OR BREACH OF WARRANTY BY CONTRACTOR; OR E 05/2008 00700- 17 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (B) IS ATTRIBUTABLE TO BODILY INJURY, SICKNESS, DISEASE OR DEATH OR INJURY TO OR DESTRUCTION OF TANGIBLE PROPERTY, INCLUDING THE LOSS OF USE RESULTING THEREFROM;AND CIS CAUSED IN WHOLE OR IN PART OR IS ALLEGEDLY CAUSED IN WHOLE OR IN PART BY ANY NEGLIGENT ACT OR OMISSION OF THE CONTRACTOR, ANY SUBCONTRACTOR, THEIR AGENTS OR EMPLOYEES OR ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY ANY ONE OF THEM OR ANYONE FOR WHOSE ACTS ANY OF THEM MAY BE LIABLE, REGARDLESS OF WHETHER OR NOT IT IS CAUSED IN PART OR ALLEGEDLY CAUSED IN PART BY THE NEGLIGENCE, GROSS NEGLIGENCE OR STRICT LIABILITY OF OWNER, ENGINEER f"! AND/OR A PARTY INDEMNIFIED HEREUNDER. �� Notwithstanding the foregoing or anything in the Agreement to the contrary, in accordance with the provisions of Section 130.002 of the Texas Civil Practice and Remedies Code, CONTRACTOR shall not be obligated to indemnify or hold harmless the ENGINEER,his agents, servants or employees, from liability for damage that is caused by or results from defects in plans, designs or specifications prepared, approved or used by the ENGINEER, or negligence of the ENGINEER in the rendition or conduct of professional duties called for or arising out of any construction contract and the plans, designs or specifications that are a part of the construction contract, and arises from personal injury or death, property injury, or any other expense that arises from personal injury, death, or property injury. This indemnity agreement is a continuing obligation, and shall survive notwithstanding completion of the Work, Final Payment, expiration of the warranty period, termination of the Contract, and abandonment or takeover of the Work. - CONTRACTOR's indemnification obligations hereunder shall not be limited bya limitation on g amount or type of damages, compensation or benefits payable by or for the CONTRACTOR or a subcontractor under workers' compensation acts, disability benefit acts or other employee benefit acts, and shall not be limited by any limitation on amounts or coverage of insurance provided or to be provided under this Contract. 4.27 LOSSES FROM NATURAL CAUSES. All loss, cost, expense or damage to the CONTRACTOR arising out of the nature of the Work to be done or from any unforeseen circumstances in the prosecution of the same, or from the action of the elements, or from unusual obstructions or difficulties which may be encountered in the prosecution of the Work, shall be sustained and borne by the CONTRACTOR at his own cost and expense. 4.28 GUARANTEE. The CONTRACTOR hereby guarantees all the Work under the Contract to be free from defects or deficiencies in material in every particular and free from defects or deficiencies in workmanship; and against unusual damage from proper and usual use; and agrees to replace or to re-execute without cost to the OWNER such Work as may be found to C be defective, deficient or otherwise not in conformance with the Contract Documents, and to make good all damages caused to other work or material, due to such defective Work or due to its required replacement or re-execution. This guarantee shall cover a period of one year from the date of Substantial Completion or Partial Substantial Completion of Work under the Contract, as evidenced by the Certificate of Substantial Completion. Neither the Certificate of Substantial 05/2008 00700- 18 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Completion, Final Payment, nor any provision in the Contract Documents shall relieve the CONTRACTOR of the responsibility for defective, deficient or non-conforming material or workmanship during the period covered by the guarantee. The one-year period of guarantee will not limit the OWNER'S other rights under common law with respect to any defects, deficiencies or non-conforming Work discovered after one year. If this one-year guarantee conflicts with other warranties or guarantees,the longer period of warranty or guarantee will govern. 5.0 PROSECUTION AND PROGRESS 5.01 TIME AND ORDER OF COMPLETION. It is the meaning and intent of this Contract, unless otherwise herein specifically provided, that the CONTRACTOR shall be allowed to prosecute his Work at such times and seasons, in such order of precedence, and in such manner as shall be most conducive to economy of construction; provided, however, that the order and the time of prosecution shall be such that the Work shall be Substantially Completed as a whole and in part, in accordance with this Contract and the Contract Time; provided, also, that when the OWNER is having other work done, either by contract or by his own forces, the ENGINEER may direct the time and manner of constructing the Work done under this Contract, so that conflict will be avoided and the construction of the various works being done for the OWNER shall be harmonized, and the CONTRACTOR shall fully cooperate and coordinate its Work with OWNER or such other contractors. The CONTRACTOR shall submit, at such times as may reasonably be requested by the ENGINEER, schedules which shall show the order in which the CONTRACTOR proposes to carry on the Work, with dates on which the CONTRACTOR will start the several parts of the work, and estimated dates of completion of the several parts. Such schedules shall show completion of the Work within the Contract Time, and/or shall show such recovery efforts as CONTRACTOR intends to undertake in the event Substantial Completion of the Work is delayed. 5.02 EXTENSION OF TIME. The CONTRACTOR agrees that he has submitted his Bid Proposal in full recognition of the time required for the completion of this Project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions as hereinafter set forth, and that he shall not be entitled to, nor will he request, an extension of time on this Contract, except when Substantial Completion of the Work has been delayed solely by any act or neglect of the OWNER, the ENGINEER, or any employee of either, by other contractors employed by the OWNER, by any approved change in the Work, by strikes, lockouts, fires, Acts of God, or by any other cause which the ENGINEER shall decide justifies the delay. The CONTRACTOR shall give the ENGINEER prompt notice, in writing and within three (3) days of the start of any such delay, of the cause of any such delay, and its estimated effect on the Work and the schedule for completion of the Work. Upon receipt of a written request for an extension of the Contract Time from the CONTRACTOR, supported by relevant and all requested documentation, the ENGINEER shall submit such written request, together with his written recommendation, to the OWNER for consideration. If the delay is not attributable in whole or in part to any act or omission of CONTRACTOR, its subcontractors or suppliers, and if the OWNER determines that CONTRACTOR is entitled to an extension of time under the terms of the Contract, the OWNER shall grant an extension of time for Substantial Completion of the Work, sufficient to compensate for the delay, and such extension of time shall be CONTRACTOR's sole and exclusive remedy, except as may be otherwise provided herein. No extensions of Contract Time shall be made for delays occurring prior to the Contractor's C mobilization as defined in Section 01505 MOBILIZATION. 05/2008 00700- 19 of 36 E CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT The Contract Time as defined in the Bid Proposal and other sections herein contains 40 Rain Days. The CONTRACTOR is required to keep record of all weather related delays and to submit the monthly count on each Pay Application. The Owner's Representative shall review and sign off on this record as a part of the Pay Application approval process every month. If, during preparation of the Balancing Change Order, the status of the work progress requires an extension of the Contract Time, Impact Days shall be added to the Completion Date equal to the total number of Weather or Impact Days approved less the original 40 days resident in the original t— Contract Time. The Addition of Weather or Impact Days will only alter the Contract Time when added by Change Order. If the Work is completed prior to the Completion Date,No Days will be added. The addition of Weather or Impact Days shall be the CONTRACTOR's sole remedy for delays to the completion of the Work and their addition to the Contract Time shall not affect the Contract Price through any "per deim" adjustment to the General Conditions costs, Temporary f ' Facilities costs or any other costs associated with the extension of the Contract Time. 5.03 HINDRANCES AND DELAYS. In executing the Contract, the CONTRACTOR agrees that in undertaking to complete the Work within the time herein fixed, he has taken into consideration and made allowances for all interference, disruption, hindrances and delays incident to such Work, whether growing out of delays in securing material, workmen or otherwise. No claim shall be made by the CONTRACTOR for damages, loss, costs or expense resulting from interference, disruption, hindrances or delays from any cause during the progress of any portion of the Work embraced in this Contract, except where the Work is stopped or suspended by order of the OWNER, or the ENGINEER as the OWNER's representative, and such stoppage or suspension is not attributable to any act or omission of CONTRACTOR. 5.04 SUSPENSION OF WORK. OWNER may, without cause, order the CONTRACTOR in writing to suspend the Work, in whole or in part, for such period of time as OWNER may request. The Contract Price and/or Contract Time shall be adjusted for any increase Li in the cost of or the time required for performance of the Work caused by such suspension. No adjustment shall be made to the extent performance was or would have been suspended by a cause for which CONTRACTOR is responsible, or to the extent an adjustment is made or denied under another provision of the Contract Documents. 5.05 LIQUIDATED DAMAGES FOR DELAY: It is understood and agreed that time is of the essence, and that the CONTRACTOR will commence the Work on the date specified herein or in any Notice to Proceed, and will Substantially Complete the Work within the Contract Time. It is expressly understood and agreed, by and between the CONTRACTOR and the OWNER, that the time for the Substantial Completion of the Work described herein is reasonable time for the completion of the same, taking into consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality. The CONTRACTOR further agrees that a breach of this Contract as to completion on time will cause damage to the OWNER and that such damages cannot be accurately measured or that ascertainment will be difficult. Therefore, the parties agree that for each and every calendar day the Work or any portion thereof shall remain uncompleted after the expiration of the Contract Time, the CONTRACTOR shall pay, as liquidated damages and as a reasonable estimate of OWNER's damages, and not as a penalty, the amount set out in the Standard Form of Agreement. 05/2008 00700-20 of 36 E CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT However, the foregoing agreement as to liquidated damages constitutes only an agreement by the OWNER and the CONTRACTOR as to the amount of damages which the OWNER will sustain by reason of the CONTRACTOR'S failure to complete the work within the Contract Time. Should the OWNER suffer damage by reason of any other breach by CONTRACTOR, the OWNER may recover such actual damages in addition to any liquidated damages due. The OWNER shall have the right to deduct and withhold the amount of any and all such damages whether it be the minimum amount stipulated above or otherwise, from any monies owing by it to said CONTRACTOR, or the OWNER may recover such amount from the CONTRACTOR and the sureties of his bond; all of such remedies shall be cumulative and the OWNER shall not be required to elect any one nor be deemed to have made an election by proceeding to enforce any one remedy. 5.06 CHANGE OF CONTRACT TIME: The Contract Time may only be changed by a Change Order. Any claim for an adjustment of Contract Time shall be based on written notice delivered by the party making such claim to the other party and to the ENGINEER promptly, but in no event later than ten (10) days after the event-giving rise to the claim. Notice of the extent of the claim, along with supporting data, shall be delivered within thirty (30) days of the occurrence and shall be accompanied by the claimant's written representation that the adjustment claimed is the entire adjustment to which the claimant has reason to believe it is entitled as a result of the occurrence of said event. All claims for adjustment in Contract Time shall be determined by the ENGINEER in accordance with the requirements of this paragraph. Contractor shall submit, as a minimum,the following data: A. Information showing that the time requested is not included in the existing Contract and in addition to the Contract. B. Information documenting that the number of days requested is accurate for the event. C. Revised, current construction schedule showing that the time requested affects the project's critical path. 5.07 DELAYS BEYOND OWNER'S AND CONTRACTOR'S CONTROL: Where CONTRACTOR is prevented from completing any part of the Work within the Contract Time due to delays beyond the control of the OWNER and the CONTRACTOR, including, but not limited to, interference by utility owners or other contractors performing other work, Contractor shall be entitled to an extension of the Contract Time in an amount equal to the time lost. CONTRACTOR shall not be entitled to any increase in Contract Price as a result of such delays. IN NO EVENT SHALL OWNER BE LIABLE TO CONTRACTOR FOR DAMAGES ARISING OUT OF OR RESULTING FROM (i) Delays caused by, or within the control of, the CONTRACTOR, or (ii) Delays beyond the control of both parties including, but not limited to, interference by utility owners or other contractors performing other work, fires, floods, epidemics, abnormal weather conditions, acts of God, even if such delays are due in part to the negligence, other fault, breach of contract or warranty, violation of the Texas Deceptive Trade Act, or strict liability without regard to fault of OWNER. An extension of Contract time shall be CONTRACTOR's sole and exclusive remedy for any such delays. Delays attributed to, and within the control of, a Subcontractor or Supplier shall be deemed to be delays within the control of the CONTRACTOR. E 05/2008 00700-21 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 6.0 MEASUREMENT AND PAYMENT 6.01 DISCREPANCIES AND OMISSIONS. If the CONTRACTOR knows or reasonably should have known of any discrepancies or omissions in the Plans, Specifications or Contract Documents, he shall notify the ENGINEER and obtain a clarification by Addendum before the bids are received, and if no such request is received by the ENGINEER prior to the opening of bids, then it shall be considered that the CONTRACTOR fully understands the Work to be performed and has provided sufficient sums in his Bid Proposal to complete the Work in accordance with the Plans and Specifications and Contract Documents. It is further understood that any request for clarification must be submitted no later than five (5) days prior to the opening of bids. 6.02 QUANTITIES AND MEASUREMENTS. No extra or customary measurements of any kind will be allowed, but the actual measured and/or computed length, area, volume, number and weight only shall be considered,unless otherwise specifically provided. C6.03 ESTIMATED QUANTITIES. This Agreement, including the Specifications, Plans and Contract Documents, and including any estimates contained therein, is intended to convey all Work to be done and material to be furnished hereunder. Where the estimated quantities are shown for the various classes of Work to be done and material to be furnished under this Contract, they are approximate and are to be used only as a basis for estimating the probable cost of the Work and for comparing the Bid Proposals offered for the Work. It is understood and agreed that the actual amount of Work to be done and the materials to be furnished under this Contract may differ from the estimates and that the items listed or estimated quantities stated, and/or any difference between estimated and actual Work, shall not give rise to a claim by the CONTRACTOR against the OWNER for loss, cost, expense, damages, unit price adjustment, quantity differences,unrecovered overhead or lost or anticipated profits, or other compensation. 6.04 PRICE OF WORK. It is agreed that it is the intent of this Contract that all Work described in the Bid Proposal, the Plans and Specifications and other Contract Documents, is to be done for the prices bid by the CONTRACTOR and that such prices shall include all appurtenances necessary to complete the Work in accordance with the intent of these Contract Documents as interpreted by the ENGINEER, and all costs, expenses, bond and insurance premiums, taxes, overhead, and profit. In consideration of the furnishing of all the necessary labor, equipment and material and the completion of all Work by the CONTRACTOR, and upon the completion of all Work and the delivery of all materials embraced in this Contract in full conformity with the Contract Documents, the OWNER agrees to pay to the CONTRACTOR the prices set forth in the Standard Form of Agreement, for the material actually used and services actually performed; however, the OWNER does not assume any obligation to pay for any services or material not actually authorized and used. The CONTRACTOR hereby agrees to receive such prices as payment in full for furnishing all materials and all labor required for the aforesaid Work, and for all expenses incurred by him, and for full performance of the Work and the whole thereof in the manner and according to this Agreement, the Plans and Specifications and Contract Documents, and the requirements of the ENGINEER. E 05/2008 00700-22 of 36 r CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 6.05 PAYMENTS. No payments made or approvals or certificates given shall be considered as conclusive evidence of the performance of the Contract, either in whole or in part, nor shall any certificate, approval or payment be considered as acceptance of defective, deficient or non-conforming Work. CONTRACTOR shall, at any time requested during the progress of the Work, furnish the OWNER or the ENGINEER with an affidavit showing the CONTRACTOR's total outstanding indebtedness in connection with the Work. Before Final Payment is made, the CONTRACTOR shall satisfy the OWNER, by affidavit or otherwise, that there are no unpaid L' claims due subcontractors, suppliers or laborers by reason of any Work under the Contract. Acceptance by CONTRACTOR of Final Payment shall constitute a waiver of any and all claims of whatsoever nature against OWNER, arising out of or related to the Contract, or the Work, or any acts or omissions of OWNER or ENGINEER, which have not theretofore been timely filed as provided in this Contract. 6.06 PARTIAL PAYMENTS. When the Contract Price is a lump sum amount,prior to the first Application for Payment, CONTRACTOR shall submit to ENGINEER for review and approval a Schedule of Values, which shall fairly allocate the entire Contract Price among the various portions of the Work and shall be prepared in such form and supported by such data to substantiate its accuracy as the ENGINEER may reasonably require. The Schedule of Values shall follow the trade divisions of the Specifications so far as practicable. Upon approval, this Schedule of Values shall be used by ENGINEER as the basis for reviewing the Contractor's Application for Payment. Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. On or before the tenth day of each month, the CONTRACTOR shall prepare and submit to the ENGINEER, for approval or correction, an application for partial payment, being a statement showing as completely as practicable, the total value of the Work done by the CONTRACTOR up to and including the twenty-fifth day of the preceding month; said statement shall also include the value of all conforming materials to be fabricated into the Work and stored in accordance with manufacturer's recommendation at the Work site only. No payment will be made for materials stored until Owner has approved in writing storage at the Work site. The ENGINEER shall then review such statement and application for partial payment and the progress of the Work made by the CONTRACTOR and, within ten days after the date ENGINEER receives CONTRACTOR's application for payment, if the application is found to be accurate and correct and conforming to the requirements of the Contract Documents, the ENGINEER shall prepare a preliminary certificate for partial payment and shall deliver his preliminary certification for payment to the OWNER and the CONTRACTOR; or, if the ENGINEER finds that CONTRACTOR's application for payment contains an error or is otherwise disputed, he shall notify CONTRACTOR of such error or dispute, and shall prepare a preliminary certificate for partial payment for the undisputed amount of the application for payment due CONTRACTOR, and deliver it to the OWNER and CONTRACTOR. ENGINEER'S notice to CONTRACTOR that a bona fide dispute for payment exists shall include a list of the specific reasons for nonpayment The OWNER shall then pay the CONTRACTOR, within thirty (30) days of the date of ENGINEER's receipt of the application for payment, the undisputed balance due, less applicable retainage, and further less all previous payments and all further sums that may be retained or withheld by the OWNER under the terms of this Agreement. CONTRACTOR may submit a corrected application for payment after its receipt of the ENGINEER's notice of error or dispute, and such corrected application for payment shall be reviewed by the ENGINEER and disputed or paid under the same procedure and within the same time limits set out above. 05/2008 00700-23 of 36 E CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT As a condition of any progress payment under this Agreement, CONTRACTOR shall execute and deliver to ENGINEER and OWNER a full release of all claims, direct or indirect, at law or in equity, arising out of or related to the Work to date, excluding retainage or any claims previously submitted as required under the terms of the Contract, and specifically identified and excluded by CONTRACTOR in the release. OWNER shall be entitled to retain from each progress payment five percent (5%) of the amount thereof. Such retainage shall be retained until Final Completion and satisfaction of all conditions for Final Payment. It is understood, however, that in case the whole Work be near to completion, as certified by the ENGINEER, and some unexpected or unusual delay occurs, through no neglect (� or fault on the part of the CONTRACTOR, the OWNER may, upon written recommendation of the ENGINEER, pay a reasonable and equitable portion of the retained percentage to the CONTRACTOR, or the CONTRACTOR, at the OWNER'S option, may be relieved of the obligation to fully complete the Work, and thereupon, the CONTRACTOR shall receive, at the OWNER'S option, payment of the balance due him under the Contract for Work completed in accordance with the Contract Documents, subject to OWNER's rights to otherwise withhold or retain payments, and subject to the conditions set forth under"6.08 FINAL PAYMENT." The Owner at its option and in compliance with Texas law may reduce retainage to less than the above-stated percentages. 6.07 USE OF COMPLETED PORTIONS & PUNCHLIST. The OWNER shall have the right to take possession of and use any completed or partially completed portions of the Work, notwithstanding that the time for completing the entire work or such portions may not have expired; but such taking possession and use shall not be deemed an acceptance of any work not completed in accordance with the Contract Documents. If such prior use increases the cost of or delays the Work, the CONTRACTOR shall promptly and within three (3) days of OWNER's taking possession, give OWNER written notice of same, and CONTRACTOR may be entitled to such extra compensation or extension of time, or both, as may be determined in accordance with the provisions of this Agreement. 6.08 SUBSTANTIAL COMPLETION. The CONTRACTOR shall notify the OWNER AND ENGINEER, by letter executed by a duly qualified officer of CONTRACTOR, that in CONTRACTOR's opinion, the Work of the Contract, or an agreed portion thereof, is "Substantially Complete". Upon receipt, and within a reasonable time thereafter, of such notice, the ENGINEER and the CONTRACTOR shall jointly perform a walk-through and inspection of the Work to determine the status of all or the identified portion of the work, and shall prepare a detailed list of unfinished, incomplete, defective and/or non-conforming Work("Punchlist"). If the ENGINEER determines that the Work is Substantially Complete in accordance with the Contract Documents, the ENGINEER shall issue to the OWNER and the CONTRACTOR a Certificate of Substantial Completion. OWNER shall have seven (7) days after receipt of Certificate to make written objection to the ENGINEER as to any provision of the Certificate or the attached list of non-conforming work. If ENGINEER concludes that the Work is not Substantially Complete, ENGINEER will, within fourteen (14) days, notify CONTRACTOR of the reason he believes the Work is not Substantially Complete. 05/2008 00700-24 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT rw: Upon Substantial Completion of the Work, ENGINEER will deliver to OWNER and CONTRACTOR a written recommendation as to division of responsibilities, pending final payment and acceptance, with respect to security, maintenance, utilities and damage to the Work, 14 except as otherwise provided in the Certificate of Substantial Completion. NEITHER THE SUBSTANTIAL COMPLETION OF THE WORK,NOR THE OMISSION OF AN ITEM FROM THE PUNCHLIST, SHALL EXCUSE THE CONTRACTOR FROM PERFORMING ALL OF THE WORK UNDERTAKEN, WHETHER OF A MINOR OR MAJOR NATURE, AND J— THEREBY COMPLETING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. The Certificate of Substantial Completion shall establish the time period within �! which CONTRACTOR shall complete the Work for Final Acceptance by the Owner and L. ENGINEER. irl 6.08-1 OWNER shall have the right to exclude CONTRACTOR from the Work after the date of Substantial Completion, for security requirement reasons. OWNER may establish an access procedure to facilitate CONTRACTOR's uninterrupted access to the Work for the purposes of completing and correcting all items on the Punchlist in an expeditious manner. 6.09 FINAL PAYMENT. Final payment of the Retainage withheld from the Contract ,17 Price shall be made by the OWNER to the CONTRACTOR at such time as: (a) the Work,including all Change Orders and including all Punchlist work, has been fully completed in strict accordance with the Contract Documents; (b) the Contract has been fully performed except for the CONTRACTOR's responsibility to correct nonconforming Work during the warranty period set forth in the Contract Documents, and to satisfy other requirements, if any, which necessarily survive final payment; (c) CONTRACTOR delivers to OWNER a certificate evidencing that insurance required by the Contract Documents to remain in force after final payment is currently in effect and will not be cancelled or allowed to expire until at least 30 days prior written notice has been given to OWNER; (d) CONTRACTOR delivers to OWNER a Consent of Surety, if any, to final payment; !ri! (e) CONTRACTOR delivers to OWNER a complete set of As-Built Drawings, reflecting all deviations from the Plans, Specifications and approved shop drawings in the Work actually constructed, and delivers all maintenance and operating 7 manuals and/or instructions; (f) CONTRACTOR delivers to OWNER all building certificates required prior to. occupancy and all other required inspections/approvals/acceptances by city, county, state governmental entities or other authorities having jurisdiction; (g) CONTRACTOR delivers to OWNER assignments of all guarantees and warranties from subcontractors, vendors, suppliers or manufacturers, as well as names, addresses and telephone numbers of contacts for each subcontractor, vendor, supplier or manufacturer; 05/2008 00700-25 of 36 7_ CITY OF PEARLAND GENERAL CONDITION S OF AGREEMENT (h) CONTRACTOR removes all equipment,tools, temporary facilities, surplus materials and rubbish from the site, and final cleans the site to OWNER's satisfaction; (i) CONTRACTOR delivers to OWNER a Full and Final Release and Affidavit of Bills Paid in the form attached hereto as Attachment No. 2, executed by CONTRACTOR; (j) CONTRACTOR delivers to OWNER all other documentation required to be submitted to OWNER pursuant to the Contract Documents, including but not limited to any special guarantees or warranties, operation and maintenance manuals, etc'. in each case in a form satisfactory to OWNER as determined in OWNER's sole discretion; and (k) the Final Application for Payment has been approved by the ENGINEER and OWNER. C Acceptance of Final Payment by the CONTRACTOR shall constitute a waiver of all claims by CONTRACTOR against OWNER other than any claims previously made in writing by CONTRACTOR against OWNER, and still unsettled, and except for claims arising out of third party actions, cross-claims and counterclaims. No interest shall be due or payable by OWNER to CONTRACTOR on any sums retained or withheld by OWNER pursuant to the terms or provisions of the Contract Documents, except as otherwise provided by applicable law. Neither the Certificate of Substantial Completion nor the Final Payment nor possession or acceptance of the Work shall relieve the CONTRACTOR of its obligation for correction of defective or non- conforming Work, or for fulfillment of any warranty, which may be required by law or by the Contract Documents. • 6.10 CORRECTION OF WORK BEFORE FINAL PAYMENT. The CONTRACTOR shall promptly remove from OWNER's premises all materials, equipment or Work which is defective or otherwise not in conformance with the Contract Documents, whether actually incorporated in the Work or not, and CONTRACTOR shall, at his own expense, promptly replace such materials, equipment or Work with other materials conforming to the requirements of the Contract. The CONTRACTOR shall also bear the expense of restoring all work of CONTRACTOR or other contractors damaged by any such removal or replacement. If CONTRACTOR does not remove and replace any such unsuitable Work within a reasonable time after receipt of a written notice from the OWNER or the ENGINEER, the OWNER may remove, replace and remedy such work at CONTRACTOR's expense. 6.11 CORRECTION OF WORK AFTER FINAL PAYMENT. If within one (1) year from the date of Substantial Completion or such longer period of time as may be prescribed by law or by the terms of any applicable special warranty required by the Contract Documents, any of the Work is found to be defective or not in accordance with the Contract Documents, CONTRACTOR shall, at its sole cost, correct it and any other work affected thereby promptly after receipt of a L written notice from OWNER to do so. In addition, CONTRACTOR shall be responsible for any L damage to building contents, when such damage results from the CONTRACTOR's use of faulty materials or defective workmanship, to the extent such damage is not covered by OWNER's insurance. This warranty period shall renew and recommence for each corrected item of Work L upon completion of the remedial work. This time period for correction by CONTRACTOR is in 05/2008 00700-26 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT addition to, and not in lieu of, all warranties or remedies, which exist at common law or by statute. These warranty obligations shall survive the termination of this Contract, and shall be enforceable by a decree of specific performance, in addition to such other rights and remedies available to OWNER at law or in equity. 6.12 PAYMENTS WITHHELD. The OWNER may withhold, or on account of subsequently discovered evidence nullify and demand immediate repayment of, the whole or part of any certificate for payment or payment, to such extent as may be necessary to protect OWNER from loss on account of: (a) Defective or non-conforming Work not remedied; (b) Claims filed or reasonable evidence indicating probable filing of claims; (c) Failure of the CONTRACTOR to make payments promptly to subcontractors or for material or labor; (d) Damage to another contractor, OWNER, existing improvements on the site, or to adjacent or adjoining property; • (e) Reasonable doubt that the Work can be completed for the unpaid balance of the Contract amount; (f) Reasonable indication that the Work will not be completed within the Contract Time; (g) Failure on the part of the CONTRACTOR to execute any and all documents, releases or other documents presented to the CONTRACTOR for execution, as provided for herein or otherwise; (h) Liquidated or other damages due to late completion; and/or (i) Any breach by CONTRACTOR of this Contract or any other agreement between OWNER and CONTRACTOR. When the above grounds are removed to OWNER's satisfaction,the withheld payment shall be made promptly. If the said causes are not so remedied, OWNER may remedy the same for CONTRACTOR's account, charge the entire cost thereof to CONTRACTOR and deduct such cost from the Contract Sum or from any payments due or to become due under any other agreement between OWNER and CONTRACTOR. 05/2008 00700-27 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 6.13 DELAYED PAYMENTS. Should the OWNER fail to make payment to the CONTRACTOR when payment is due in accordance with the terms of the Contract Documents, any interest due CONTRACTOR for late payments shall accrue and be paid in accordance with the provisions of Chapter 2251 of the Texas Government Code, as amended, and payment of such LL interest shall fully liquidate and compensate any injury to the CONTRACTOR growing out of such delay in payment. Should OWNER fail to pay CONTRACTOR an undisputed amount due within the time limits provided in the Contract or applicable law, CONTRACTOR shall give the notice required and comply with the provisions of Section 2251.051 of the Texas Government Code, and shall thereupon be entitled to the rights and remedies provided therein. 7.0 EXTRA WORK AND CLAIMS 7.01 CHANGE ORDERS. Without invalidating this Agreement, the OWNER may, at any time or from time to time, order additions, deletions or revisions to the Work; such changes will be authorized by Change Order to be prepared by the ENGINEER for execution by the OWNER and the CONTRACTOR. The Change Order shall set forth the basis for any change in Contract Price, as hereinafter set forth for Extra Work, and any change in Contract Time,which may result from the change. 7.02 In accordance with paragraph 1.07 CONTRACTOR'S request to work weekends, Uthe Owner's Construction Manager shall, upon receipt of written notice by the CONTRACTOR of the need to conduct work on otherwise non-Work Days,prepare a cost estimate for providing Construction Management and Inspection services during the requested period and submit this to both OWNER and CONTRACTOR. If approved by both parties the Construction Manager shall prepare a Deductive Change Order in the C amount stated in the estimate for the signature of the CONTRACTOR and the OWNER for inclusion in the next Pay Application. The Deductive C Change Order must be signed and executed by both the OWNER and CONTRACTOR prior to start of work on any non-Work Day. 7.03 MINOR CHANGES. The ENGINEER may authorize minor changes in the Work not inconsistent with the overall intent of the Contract Documents and not involving an increase in Contract Price or time. If the CONTRACTOR believes that any minor changes authorized by the ENGINEER involves Extra Work or entitles him to an increase in the Contract Price or the Contract Time, the CONTRACTOR shall give notice of same by written request to the ENGINEER for a written Work Order, with a copy to OWNER. Any such notice and request by the CONTRACTOR shall be given prior to beginning the changed work. CONTRACTOR's L commencement of any minor change in the Work prior to such written notice and request shall constitute a waiver of any and all claims for an increase in the Contract Price or the Contract Time arising out of or related to such changed work. 7.04 EXTRA WORK. It is agreed that the CONTRACTOR shall perform all work under the direction of the ENGINEER when presented with a written Change Order, Work �� Change Directive or Work Order signed by the ENGINEER, subject, however, to the right of the CONTRACTOR to require written confirmation of such Change Order, Work Change Directive or C Work Order by the OWNER. It is agreed that the basis of compensation or adjustment to the CONTRACTOR for work either altered, added or deleted by a Change Order or Work Change 05/2008 00700-28 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT Directive, or for which a claim for Extra Work is made, shall be determined by one or more of the LL following methods: Method (A) --By Contract unit prices applicable to the work, if any; or Method (B) --By agreed unit prices or agreed stipulated lump sum price; or ?I! LI Method (C) --If neither Method (A) nor Method (B) be agreed upon before the Extra Work is commenced, then the CONTRACTOR shall be paid the "Actual Field Cost" of the work, plus five percent (5%), as full and final compensation for the Extra Work and all costs and expenses, direct or indirect, arising out of or related thereto. In the event said Extra Work or Change Order or Work Change Directive work is performed and paid for under Method (C), then the provisions of this paragraph shall apply and the"Actual Field Cost" is hereby defined as the cost to the CONTRACTOR of all workers, such as foremen, timekeepers, mechanics and laborers, and materials, supplies, trucks, rentals of machinery and equipment, for the time actually employed or used on such alleged Extra Work or Change Order or Work Change Directive work, plus actual transportation charges necessarily incurred together with all power, fuel, lubricants, water and similar operating expenses, plus all necessary incidental expenses incurred directly on account of such Extra Work, including Social Security, Old Age Benefits and other payroll taxes, and a rateable proportion of premiums on Performance and Payment Bonds and Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation, and all other insurance as may be required by law or ordinance, or the Contract Documents, plus all payments to subcontractors for such work. The ENGINEER may direct the form in which accounts of the "Actual Field Cost" shall be kept and the records of these accounts shall be made available to the ENGINEER. The ENGINEER or OWNER may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise these matters shall be determined by the CONTRACTOR. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using one hundred percent (100%), unless otherwise specified, of the latest schedule of Equipment Ownership Expense adopted by the Associated General Contractors of America where practicable. The five percent (5%) of the "Actual Field Cost" to be paid to the CONTRACTOR, shall cover and compensate him for his profit, overhead, and all other elements of cost and expense not embraced within the"Actual Field Cost" as herein defined, save that where the CONTRACTOR's field office must be maintained solely on account of such Extra Work, then the cost to maintain and operate the same shall be included in the "Actual Field Cost." No claim for Extra Work of any kind will be allowed unless ordered by the ENGINEER in a written Work Order. In case any orders or instructions, either oral or written, appear to the E ' CONTRACTOR to involve Extra Work for which he should receive compensation or an adjustment in the Contract Time, he shall make written request to the ENGINEER for a written Work Order authorizing such Extra Work within ten (10) days of ENGINEER's orders or instructions, otherwise the orders or instructions will be considered minor changes. The issuance 05/2008 00700-29 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT of a Work Order by the ENGINEER shall not constitute or be construed as an agreement or acknowledgement by the ENGINEER that the work which is the subject of the Work Order is Extra Work outside the scope of the Contract Work, but shall merely constitute a direction to the CONTRACTOR to perform the work, and the CONTRACTOR shall proceed with the work, and shall keep an accurate account of the "Actual Field Cost" thereof, as provided under Method (C). Upon completion of the alleged Extra Work, the CONTRACTOR shall promptly and within ten (10) days submit his claim to the ENGINEER by proper certification and attestation, on forms provided by the ENGINEER. The ENGINEER shall render a written decision on CONTRACTOR's claim within ten (10) days. It is mutually agreed between the parties that the ENGINEER's decision on all claims or questions in relation to the Work, CONTRACTOR's performance of the Work, any changes in the Work or Extra Work, the Contract Price and/or the Contract Time, shall be final and conclusive and binding upon the parties. If the ENGINEER shall fail to respond in writing to CONTRACTOR's claim within thirty (30) days of the date of L submission, or if CONTRACTOR shall dispute or object to ENGINEER's decision on any claim, and CONTRACTOR fails to file a Request for Mediation of such claim in accordance with the provisions of Article 9.0, within sixty (60) days after the date of submission to the OWNER, or such longer period as the parties may agree to in writing, the CONTRACTOR shall lose and forfeit his right to make such claim for Extra Work at any later date, and all such claims held by the CONTRACTOR shall be deemed waived, forfeited and forever barred. CONTRACTOR shall continue to diligently prosecute the Work notwithstanding any pending claim, dispute, or dispute resolution process between OWNER and CONTRACTOR. 7.05 TIME OF FILING CLAIMS. Except as otherwiseprovided herein, all questions P of dispute or adjustment shall be in writing and filed with the ENGINEER within three (3) days after the ENGINEER has given any directions, order or instruction to which the CONTRACTOR desires to take exception. The ENGINEER shall reply within thirty (30) days to such written exceptions, and render his final decision in writing. It is mutually agreed between the parties that the ENGINEER's decision on all claims or questions in relation to the Work, CONTRACTOR's performance of the Work, any changes in the Work or Extra Work, the Contract Price and/or the Contract Time, shall be final and conclusive and binding upon the parties. In case the CONTRACTOR should desire to appeal from the ENGINEER's decision, the CONTRACTOR may request a meeting between representatives of the OWNER and the CONTRACTOR for the purposes of appealing the ENGINEER's decision directly to the OWNER, such meeting to occur within ten (10) days after the date of the CONTRACTOR's request, or such longer period as may be agreed to by the parties in writing. If the CONTRACTOR shall still be aggrieved after a meeting with the OWNER and/or his representative, the CONTRACTOR shall have sixty (60) days after the date of the meeting, or such longer period as the parties may agree to in writing, to file a Request for Mediation of such claim in accordance with the provisions of Article 9.0. In the event the CONTRACTOR shall fail, for any reason, to timely file a Request for Mediation, the OWNER shall be released of any and all liability, and the CONTRACTOR's failure to timely file a Request for Mediation shall constitute a waiver, forfeit and final bar of all such claims held by the CONTRACTOR against the OWNER. CONTRACTOR shall continue to diligently prosecute the Work notwithstanding any pending claim, dispute, or dispute resolution process between OWNER and CONTRACTOR. E 05/2008 00700-30 of 36 E CCITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT P 8.0 DEFAULT 8.01 DEFAULT BY CONTRACTOR. In case the CONTRACTOR should abandon and fail or refuse to resume Work within five (5) days after written notification from the OWNER or the ENGINEER, or if the CONTRACTOR fails to comply with the orders of the ENGINEER when such orders are consistent with the Contract Documents, or if the CONTRACTOR otherwise defaults on its obligations under the Contract, OWNER shall have the right, if it so elects and without prejudice to any other rights it may have, after giving five (5) days written notice of L default to CONTRACTOR and any surety, to terminate the Contract or any part thereof and/or to take over or cause others to take over the Work or any part thereof, and to complete such Work for the account of CONTRACTOR. Where Performance and Payment Bonds exist, the sureties on these bonds shall be directed to complete the Work in conjunction with the notice of default, and a copy of said notice shall be delivered to the CONTRACTOR. After receiving said notice of default,the CONTRACTOR shall promptly and within no more than three (3) days, remove from the Work any machinery, equipment, or tools then on the job, not intended for incorporation into the Work. Should CONTRACTOR fail to promptly remove such machinery, equipment or tools, OWNER may remove such machinery, equipment or tools and store same at CONTRACTOR's expense; return such machinery, equipment or tools to their purported owner; or otherwise dispose of such machinery, equipment or tools as OWNER sees fit. Any materials, supplies and/or equipment delivered for use in the Work, may be used in the completion of the Work by the OWNER or the surety on the Performance Bond, or another contractor in completion of the Work; it being understood that the use of such equipment, supplies and materials will ultimately reduce the cost to complete the Work and be reflected in the final settlement. Where there is no Performance Bond or in case the suretyshould fail to commence compliance P with the notice for completion hereinabove provided for within ten (10) days after the service of such notice, then the OWNER may provide for completion of the Work in either of the following elective manners: (a) The OWNER may thereupon employ such force of workers and use such machinery, equipment, tools, materials and supplies as the OWNER may deem necessary to expeditiously complete the Work, and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said CONTRACTOR, and expense so charged shall be deducted and paid by the OWNER out of such monies as may be due or that may thereafter at any time become due to the CONTRACTOR under and by virtue of this Agreement or any other agreement between OWNER and CONTRACTOR. In case such expense is less than the sum which would have been payable under this Contract if the same had been completed by the CONTRACTOR, then said CONTRACTOR shall be credited with the difference. In case such expense is greater than the sum which would have been payable under this Contract if the same had been completed by L such CONTRACTOR, then the CONTRACTOR and/or his surety shall promptly pay the amount of such excess to the OWNER upon demand; or 05/2008 00700-31 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (b) The OWNER, under sealed bids, under the times and procedures provided for by law, may let the contract for completion of the Work under substantially the same terms and conditions which are provided in this Contract. In case of any increase in cost to the OWNER under the completion contract, as compared to what would have been the cost under this Contract, such increase shall be charged to the CONTRACTOR, and the amount of such increase may be deducted by the OWNER out of such monies as may be due or that may thereafter at any time become due to the CONTRACTOR under and by virtue of this Agreement or any other agreement between OWNER and CONTRACTOR, or the CONTRACTOR and/or his surety shall promptly pay the amount of such increase to the OWNER upon demand. However, should the cost to complete any such completion contract prove to be less than what would have been the cost to complete under this Contract, the CONTRACTOR and/or his surety shall be credited therewith. In the event of a default by CONTRACTOR, no further payments shall be made to CONTRACTOR under the Contract until the Work is Finally Completed. When the Work shall have been Finally Completed, the CONTRACTOR and his surety shall be so notified. A complete itemized statement of the Contract accounts, certified by the ENGINEER as being correct, shall then be prepared and delivered to the CONTRACTOR and his surety, whereupon the CONTRACTOR and/or his surety shall pay the balance due as reflected by said statement. The OWNER, prior to incurring an obligation to make payment hereunder, shall have such statement of completion attested to by the CONTRACTOR and the surety as accurate, and in exchange for payment of the sum stated therein, the OWNER shall be entitled to a full and final release of any claims or demands by the CONTRACTOR or the surety. In the event the statement of accounts shows that the cost to complete the work is less than that E. which would have been the cost to the OWNER had the work been completed by the CONTRACTOR under the terms of this Contract, or when the CONTRACTOR and/or his surety shall pay the balance shown to be due by them to the OWNER, then all machinery, equipment, tools or supplies left on the site of the Work shall be turned over to the CONTRACTOR and/or his surety. Should the cost to complete the Work exceed the Contract Price, and the CONTRACTOR and/or his surety fail to pay the amount due the OWNER within the time designated above, and there remains any machinery, equipment, tools, materials or supplies which are the property of CONTRACTOR on the site of the Work, notice thereof, together with an itemized list of such equipment and materials, shall be mailed to the CONTRACTOR and his surety at the respective addresses designated in the Contract, provided, however, that actual written notice given in any manner will satisfy this condition. After mailing or other giving of such notice, such property shall be held at the risk of the CONTRACTOR and his surety, subject only to the duty of the [111OWNER to exercise ordinary care to protect such property. After fifteen (15) days from the date of such notice, the OWNER may sell such property, equipment, tools, materials or supplies, and apply the net sum derived from such sale to the credit of the CONTRACTOR and his surety. Such sale may be made at either public or private sale, with or without notice, as the OWNER may elect. The OWNER shall release any machinery, equipment, tools, materials or supplies, which remain on the Work, and belong to persons other than the CONTRACTOR or his surety, to their reputed owners. E 05/2008 00700-32 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 8.02 SUPPLEMENTATION OF CONTRACTOR FORCES. If CONTRACTOR at any time shall, in OWNER'S sole opinion, fail to furnish skilled workers, suitable materials, supplies or adequate equipment sufficient for the prompt, timely and diligent prosecution of the Work in accordance with OWNER's direction, OWNER shall have the right, without prejudice to the exercise of other remedies for the same default and without fully taking over the Work, to supplement CONTRACTOR's forces and to expedite delivery of and to procure and furnish such workers, materials, tools, supplies or equipment for CONTRACTOR's account ppby employing other contractors and suppliers engaged in the same class of work and charge the entire cost thereof to CONTRACTOR, said cost to be deducted from sums due or to become due to CONTRACTOR under the Contract or any other agreement with OWNER or any parent, subsidiary or affiliate of OWNER. 8.03 CUMULATIVE REMEDIES & SPECIFIC PERFORMANCE. All rights and remedies of OWNER, under the terms of the Contract and/or available at law or in equity, are cumulative. In the event CONTRACTOR or any of its subcontractors, vendors or suppliers fails Lor refuses for any reason to provide timely manufacture, fabrication, delivery, installation, erection, construction or completion of any supplies, materials, expendables, equipment, machinery, accessories or appurtenances to be furnished hereunder, CONTRACTOR acknowledges and agrees that such items are required, necessary, essentially unique to the Project and the Work and will cause irreparable harm to OWNER and the Project if not furnished in accordance with the Contract, and OWNER shall have the right to obtain a decree of specific performance and mandatory injunctive relief from any Court of competent jurisdiction to ensure the timely furnishing of such items. 8.04 CROSS-DEFAULT. If, for any reason, CONTRACTOR is declared in default and/or terminated by OWNER under any other agreement with OWNER, whether related to the Project or not related to the Project, OWNER shall have the right to offset and apply any amounts which might be owed to OWNER by CONTRACTOR under any other such agreements against any earned but unpaid amounts owing to CONTRACTOR by OWNER under the Contract, any retainage earned by CONTRACTOR under the Contract or any unearned, unpaid amount under the Contract. 8.05 INSOLVENCY. It is recognized that if CONTRACTOR becomes a debtor in voluntary or involuntary bankruptcy proceedings, makes a general assignment for the benefit of creditors, or if a receiver is appointed on account of his insolvency, such events could seriously impair or frustrate CONTRACTOR's performance of the Work. Accordingly, it is agreed that should CONTRACTOR become a debtor in bankruptcy, either voluntary or involuntary, CONTRACTOR shall notify OWNER in writing within twenty-four (24) hours of the filing with the bankruptcy court. Further, it is agreed that upon occurrence of any one or more such events, OWNER shall be entitled to request of CONTRACTOR or its successors, trustees or receivers, adequate assurances of future performance. In the event such adequate assurances are not given to the reasonable satisfaction of OWNER within seventy-two (72) hours of such request, OWNER shall have the right to immediately invoke the remedies of this Section 8 or as provided by law. Pending receipt of such adequate assurances of such future performance, OWNER may proceed with the Work on a temporary basis and deduct the costs, plus reasonable overhead and profit, from any amounts due or which may become due to CONTRACTOR under the Contract or any other agreement with OWNER. In this regard, OWNER and CONTRACTOR agree that delays in C performance could result in more damages to CONTRACTOR than would be sustained if OWNER failed to exercise such remedies. 05/2008 00700-33 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 8.06 CONTINGENT ASSIGNMENT. CONTRACTOR hereby assigns to OWNER, all g of CONTRACTOR's rights under and interest in any and all subcontracts and/or purchase orders entered into by CONTRACTOR pursuant to this Agreement, such assignment to become effective upon CONTRACTOR's default under this Agreement or OWNER's termination of this Contract, and OWNER's acceptance of such assignment. Upon CONTRACTOR's default or OWNER's termination of this Contract, OWNER may, in the event there is no performance bond for the Contract, or in the event the performance bond surety fails to complete the Contract,or if OWNER otherwise so elects in its sole discretion, accept such assignment by written notice of such acceptance to CONTRACTOR and subcontractor, and may require subcontractors to perform all of the then unperformed duties and obligations under the subcontract, for the direct benefit of OWNER. In the event OWNER requires such performance by a subcontractor, then OWNER shall be obligated to pay such subcontractor any amounts due and owing under the terms of the subcontract/purchase order, at the subcontract prices and rates, and subject to any rights of withholding or offset and other terms and conditions of the subcontract, for all work properly performed by such subcontractor, to the date of OWNER's acceptance and thereafter. OWNER's liability in this connection, however, shall not exceed the amount obtained by subtracting all payments made by CONTRACTOR to subcontractor from the Subcontract Price at the time of CONTRACTOR's default or OWNER's termination of CONTRACTOR. CONTRACTOR shall include a provision in its subcontracts that allows such assignment and allows OWNER to take these actions, and further provides.that in the event of CONTRACTOR's termination for default, the subcontractor agrees to give the OWNER or its agent the right to inspect all books and records of subcontractor relating to the Work. 8.07 WAIVER OF CONSEQUENTIAL DAMAGES. CONTRACTOR expressly waives any and all claims for consequential damages against OWNER arising out of or related to this Contract, or any other agreements between CONTRACTOR and OWNER, including,but not limited to, claims for damages incurred by CONTRACTOR for principal office expenses, including the compensation of personnel stationed there, losses of financing, bonding capacity, business and reputation, and claims for lost profit, whether on this Contract or otherwise. 8.08 TERMINATION FOR CONVENIENCE. OWNER may at its sole discretion, 71, upon five (5) days written notice to CONTRACTOR, terminate this Contract, in whole or in part, if and when OWNER determines that it is in the best interest of OWNER to do so. Upon receipt of such written notice from OWNER, CONTRACTOR shall cease all terminated Work and take reasonable precautions to protect and preserve such work, and shall take all reasonable measures after consultation with OWNER to terminate or assign to OWNER all subcontracts, purchase orders or other commitments related to the Work or the Project on terms and conditions acceptable to OWNER. CONTRACTOR will be paid for all Work performed in strict accordance with the Contract Documents, based upon the Contract Price and the percentage of completion on the date of termination, and less amounts previously paid, subject to any reasonable backcharges attributable to CONTRACTOR's failure to comply with any of the provisions of this Contract and further subject to the other terms of this Contract regarding payment. In no event will CONTRACTOR receive or be entitled to any payment or compensation whatsoever for interruption of business or loss of business opportunities, any other items of consequential damages, for overhead or loss of profits on the unperformed Work and/or services and unfurnished materials or for any intangible, impact or similarly described cost, damages or expense, and under no circumstances shall the total sum paid to or received by CONTRACTOR under this Contract 05/2008 00700-34 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT exceed the Contract Price. The compensation provided herein shall be CONTRACTOR's sole and exclusive remedy arising out of a termination for convenience. 8.09 DEFAULT BY OWNER. In case the OWNER shall default on its material obligations under this Contract, other than OWNER's failure to pay CONTRACTOR an undisputed amount due within the time limits provided in the Contract or applicable law, as addressed by Section 6.13 of this Agreement, and shall fail or refuse to cure, or to commence and diligently pursue cure of such default within fifteen (15) days after written notification by the CONTRACTOR, then the CONTRACTOR may suspend or wholly abandon the Work, and may remove therefrom all machinery, tools and equipment, and all materials on the site of the Work that have not been included in payments to the CONTRACTOR and have not been incorporated into the Work. And thereupon, the ENGINEER shall make an estimate of the total amount earned by the CONTRACTOR, which estimate shall include the value of all Work actually completed by said CONTRACTOR (at the Contract Prices), the value of all partially competed Work at a fair and equitable price, and the amount of all Extra Work performed at the prices agreed upon, or provided for by the terms of this Contract, and a reasonable sum to cover the cost of any provisions made by the CONTRACTOR to carry the whole Work to completion and which cannot be utilized. The ENGINEER shall then make a final statement of the balance due the CONTRACTOR by deducting from the above estimate all previous payments by the OWNER and all other sums that may be retained by the OWNER under the terms of this Agreement, and shall present the same to the OWNER, and OWNER's payment of said sum to the CONTRACTOR, on or before thirty (30) days after OWNER's receipt of such statement, shall satisfy any and all rights, claims or causes of action of CONTRACTOR arising out of or related to such default by OWNER, and shall be CONTRACTOR's sole and exclusive remedy for such default. A disputed L' or unilateral claim by the Contractor cannot by itself constitute a default hereunder. 9.0 DISPUTE RESOLUTION Any dispute or pending claim or dispute resolution process between OWNER and CONTRACTOR shall not excuse or relieve CONTRACTOR of its obligations under the Contract, and CONTRACTOR shall diligently prosecute the Work notwithstanding any pending claim, dispute, or dispute resolution process between OWNER and CONTRACTOR. All claims, disputes and other matters in question arising out of or relating to,the Contract, or the breach thereof, shall be subject to mediation as a condition precedent to any other dispute resolution process as may be selected by OWNER. Unless mutually agreed otherwise the mediation shall be conducted by a third party who will be selected by agreement between OWNER and CONTRACTOR, and Request for Mediation shall be filed with the other party. The parties shall share the mediator's fee and any filing fees equally. If a claim, dispute or other matter in question between OWNER and CONTRACTOR involves the work of a subcontractor or supplier, OWNER or CONTRACTOR may join such subcontractor or supplier as a party to any mediation proceeding between OWNER and CONTRACTOR hereunder. CONTRACTOR shall include in all subcontracts and/or purchase orders related to the Work a specific provision whereby the subcontractor or supplier consents to L being joined in mediation between OWNER and CONTRACTOR involving the work of such subcontractor or supplier. [a 05/2008 00700-35 of 36 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT This Contract shall be governed by the laws of the State of Texas and shall be considered performable in Brazoria County, Texas, for venue purposes. Further, the OWNER and CONTRACTOR stipulate that venue for any dispute resolution proceeding involving or touching upon the Contract other than the conduct of an arbitration hearing shall be in Brazoria County, Texas, or, if such choice of venue is prohibited or unenforceable by law, shall be held in the county where the Project is located. CONTRACTOR agrees to pay OWNER all reasonable attorneys' fees incurred by OWNER in the event OWNER seeks to enforce any provision of this Contract whether by arbitration or other dispute resolution process. Further, in the event OWNER defends any claim instituted by CONTRACTOR against OWNER, whether in arbitration or other dispute resolution process, CONTRACTOR agrees to pay OWNER all reasonable attorneys' fees incurred by OWNER in defending such claim provided OWNER is the prevailing party, in whole or in part, in such proceeding. r r r 05/2008 00700-36 of 36 7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT NT [7 ATTACHMENT NO. 1 TO GENERAL CONDITIONS WORKERS' COMPENSATION INSURANCE COVERAGE 7 A. DEFINITIONS: 7 Certificate of coverage ("certificate") _A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC81, TWCC-82, TWCC-83 or TWCC-84), showing statutory 7 workers' compensation insurance coverage for the person's or entity's employees providing services on a project for the duration of the Project. 7 Duration of the Project .includes the time from the beginning of the Work on the Project until the contractor's/person's work on the Project has been completed and rthe Project warranty period has expired. Persons providin g g services on the project includes persons or entities performing all or part of the services the contractor has undertaken to perform on the project, 7 regardless of whether that person contracted directly with due contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, motor carriers and owner- 7 operators, (as defined at Section 406.121 of the Texas Labor Code), leasing companies, and employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without 7 limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office 7 supply deliveries, and delivery of portable toilets. B. The CONTRACTOR shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the 7 statutory requirements of Texas Labor Code, Title 5 Workers' Compensation, Subtitle A Texas Workers' Compensation Act, for employees of the contractor providing services on 7 the project, for the duration of the project. C. The CONTRACTOR must provide a certificate of coverage to the OWNER prior to being 7 awarded the Contract. 7 D. If the coverage period shown on the CONTRACTOR's current certificate of coverage ends during the duration of the project, the CONTRACTOR must, prior to the end of the coverage period, file a new certificate of coverage with the OWNER showing that 7 coverage has been extended. E. The CONTRACTOR shall obtain from each subcontractor or other person providing 7 services on a project, and provide to the OWNER: 7 (I) a certificate of coverage, prior to that person beginning work on the Project, so the OWNER will have on file certificates of coverage showing coverage for all persons providing services on the Project; and 05/2007 00700-Al 7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (2) no later than seven days after receipt by the CONTRACTOR and prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. F. The CONTRACTOR shall retain all required certificates of coverage for the duration of the Project and for one year thereafter. G. The CONTRACTOR shall notify the OWNER in writing by certified mail or personal delivery, within 10 days after the CONTRACTOR knew or should have known, of any changes that materially affect the provision of coverage of any person providing services on the Project. H. The CONTRACTOR shall post on each Project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. NOTICE REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that eachperson workingon this site or providing p g services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at (512) 440- 3789 to receive information on the legal requirements for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." I. The CONTRACTOR shall contractually require each person with whom it contracts to provide services on a project,too: (1) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Title 5 Workers' Compensation, Subtitle A Texas Workers' Compensation Act, for all of its employees providing services on the Project, for the duration of the Project; (2) provide to the CONTRACTOR,prior to that person beginning work on the L Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the Project: (4 05/2007 00700-A2 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT (3) provide the CONTRACTOR,prior to the end of the coverage period, a new certificate of coverage, showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; (4) obtain from each other person with whom it contracts, and provide to the CONTRACTOR: (a) a certificate of coverage,prior to the other person beginning work on the Project; and (b) a new certificate of coverage showing extension of coverage,prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; (5) retain all required certificates of coverage on file for the duration of the Project and for one year thereafter; (6) notify the OWNER in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project; and (7) contractuallyrequire eachperson with whom it contracts,toperform as required q q by paragraphs (1) - (7), with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this Contract or providing or causing to be provided a certificate of coverage, the CONTRACTOR is representing to the OWNER that all employees of the CONTRACTOR who will provide services on the Project will be covered by workers' compensation coverage for the duration of the Project, that the coverage agreements will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the CONTRACTOR to administrative penalties, criminal penalties, civil penalties, or other civil actions. K. The CONTRACTOR's failure to comply with any of these provisions is a breach of contract by the CONTRACTOR, which entitles the OWNER to pursue all rights and remedies available to it under the Contract, at law or in equity, if the CONTRACTOR does not remedy the breach within ten days after receipt of notice of breach from the OWNER. E 05/2007 00700-A3 r_7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ATTACHMENT NO. 2 TO GENERAL CONDITIONS AGREEMENT FOR FINAL PAYMENT AND CONTRACTOR'S SWORN RELEASE In consideration of the Final Payment under that certain contract between [Contractor's Company Name] (hereafter "CONTRACTOR") and the City of Pearland (hereafter "OWNER") for the Project known as [Official Project Title] (the "Contract"), the CONTRACTOR makes the following representations to OWNER, either individually if a proprietorship, or jointly and severally by all general partners if a partnership, or if a corporation, by action of the president and secretary of said corporation, as duly authorized by appropriate action of the stockholders and/or board of directors of said corporation, their signatures hereon constituting a representation under oath by said individuals that they have the authority to execute this Agreement for and on behalf of the said corporation: 1. The undersigned CONTRACTOR represents to OWNER that the Application for Payment for the Final Payment under the Contract, and the final Change Order issued under the Contract if any, whether or not modified, corrected or changed in some way by the ENGINEER, the CONTRACTOR or the OWNER, a copy of which are attached hereto and marked Exhibit "A", are true, correct and accurate, and that CONTRACTOR has received payment in full for all other Applications for 7 Payment submitted under the Contract, and that CONTRACTOR has been fully compensated for all labor, materials, equipment and/or services furnished in connection with the Contract, except for the Final Payment. 2. It is agreed and stipulated by the undersigned CONTRACTOR that upon the receipt of Final Payment in the amount as set out on the attached Application for Payment, the CONTRACTOR, by execution of this instrument of release, does, therefore, RELEASE and FOREVER DISCHARGE OWNER of and from all manner of debts, claims, demands, obligations, suits, liabilities and causes of action of any nature whatsoever, at law or in equity, in contract or in tort, now existing or which may hereafter accrue, arising out of or related to the Contract, any Change Orders or Work Orders, the Work, or any labor, materials, equipment or services furnished by CONTRACTOR to OWNER. 3. The CONTRACTOR, acting by and through the person or persons whose names are subscribed hereto, does solemnly swear and affirm that all bills and claims have been paid to all materialmen, suppliers, laborers, subcontractors, or other entities performing services or supplying materials or equipment, and that OWNER shall not be subject to any bills, claims, demands, litigation or suits in connection therewith. 4. It is further specifically understood and agreed that this Agreement for Final Payment and Contractor's Sworn Release shall constitute a part of the Contract, and it is also specifically understood and agreed that this Agreement shall not act as a modification, waiver or renunciation by OWNER of any of its rights or remedies as set out in the Contract itself, but this Agreement for Final Payment and Contractor's Sworn Release shall constitute a supplement thereto for the additional protection of OWNER. 05/2007 00700-B 1 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT L SIGNED and EXECUTED this, the_day of , 20_ CONTRACTOR: By: Signature Print Name: Title: [If CONTRACTOR is a proprietorship, owner must sign; if a partnership, each general partner must sign; if a corporation, the following language should be used.] SIGNED and EXECUTED this, the day of 20_by , a Texas corporation, under authority granted to the undersigned by said corporation as contained in the Charter, By-Laws or Minutes of a meeting of said corporation regularly called and held. CONTRACTOR: By: President 711 ATTEST: Corporate Secretary (Corporate Seal) [This form is for use by either a proprietorship or a partnership. In the event CONTRACTOR is a partnership or a joint proprietorship, additional signature lines should be added for each individual.] 05/2007 00700-B2 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT AFFIDAVIT STATE OF TEXAS § COUNTY OF § BEFORE ME, the undersigned authority, on this day personally appeared the person or persons whose name(s) are subscribed to the above and foregoing Agreement for Final Payment and Contractor's Sworn Release, who each, after being by me duly sworn, on their oaths deposed and said: I (We) am (are) the person(s) who signed and executed the above and foregoing g g Agreement for Final Payment and Contractor's Sworn Release, and I (we)have read the facts and statements as therein set out and the representations as made therein, and I(we) state that the above and foregoing are true and correct. CONTRACTOR-Affiant SWORN TO AND SUBSCRIBED TO before me, the day of 20 . Notary Public, State of Texas My Commission Expires: [This form is for use in the event CONTRACTOR is a corporation.] r r 07/2006 00700-B3 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT AFFIDAVIT STATE OF TEXAS § COUNTY OF § BEFORE ME,the undersigned authority, on this day personally appeared the persons who signed and executed the above and foregoing Agreement for Final Payment mid Contractor's Sworn Release, whose names are set out above,who each, after being by me duly sworn, on their oaths deposed and said: We each are the persons whose names are subscribed above, and hold respectively the offices in the corporation as set out above, and each state under oath that we have the authority to execute this Agreement for Final Payment and Contractor's Sworn Release for and on behalf of said corporation,pursuant to authority granted to us in the Charter of said corporation, the By-Laws of said corporation and/or the Minutes of said corporation; and the facts, statements and representations as set out in the instrument to which this Affidavit is attached, are true and correct. SWORN TO AND SUBSCRIBED TO before me this,the day of 20_ Notary Public, State of Texas My Commission Expires: E L E 07/2006 00700-B4 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT ATTACHMENT NO. 3 TO GENERAL CONDITIONS OWNER'S INSURANCE REQUIREMENTS OF CONTRACTOR 1. Definitions. For purposes of this Agreement: 1.1 Owner Parties. "Owner Parties" means (a) the City of Pearland, its successors and assigns, and the Engineer, (b) any officers, employees, or agents of such persons or entities, and (c) others as required by the Contract Documents, if any. 1.2 Contractor. "Contractor" shall mean the vendor providing the service or work to be performed under this Agreement. 1.3 Subcontractor. "Subcontractor" shall include subcontractors of any tier. 1.4 ISO. "ISO"means Insurance Services Office. 2. Contractor Insurance Representations to Owner Parties 2.1 It is expressly understood and agreed that the insurance coverages required herein: g 2.1.1 represent Owner Parties' minimum requirements and are not to be construed to void or limit the Contractor's indemnity obligations as contained in this Agreement nor represent in any manner a determination of the insurance coverages the Contractor should or should not maintain for its own protection; and 2.1.2 are being, or have been, obtained by the Contractor in support of the Contractor's liability and indemnity obligations under this Agreement. Neither the requirements as to insurance to be carried as provided for herein, the insolvency, bankruptcy or failure of any insurance company carrying insurance of the Contractor, nor the failure of any insurance company to pay claims accruing, shall be held to affect, negate or waive any of the provisions of this Agreement. 2.2 Failure to obtain and maintain the required insurance shall constitute a material breach of, and default under, this Agreement. If the Contractor shall fail to remedy C such breach within five (5) business days after notice by the Owner, the Contractor will be liable for any and all costs, liabilities, damages and penalties resulting to the Owner Parties from such breach, unless a written waiver of the specific insurance requirement(s) is provided to the Contractor by the Owner. In the event of any failure by the Contractor to comply with the provisions of this Agreement, the Owner may, without in any way compromising or waiving any right or remedy at law or in equity, on notice to the Contractor, purchase such insurance, at the Contractor's expense, provided that the Owner shall have no obligation to do so and if the Owner shall do so, the Contractor shall not be relieved of or excused from the obligation to obtain and maintain such insurance amounts and coverages. 05/2007 00700-Cl L CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 3. Conditions Affecting All Insurance Required Herein 3.1 Cost of Insurance. All insurance coverage shall be provided at the Contractor's sole expense. 3.2 Status and Rating of Insurance Company. All insurance coverage shall be written through insurance companies authorized to do business in the state in which the work is to be performed and rated no less than A-: VII in the most current edition of A. M. Best's Key Rating Guide. 3.3 Restrictive, Limiting, or Exclusionary Endorsements. All insurance coverage shall be provided to the Owner Parties in compliance with the requirements herein and shall contain no endorsements that restrict, limit, or exclude coverage required herein in any manner without the prior express written approval of the Owner. 3.4 Limits of Liability. The limits of liabilitymay be provided by a single policy of insurance or by a combination of primary and umbrella policies, but in no event shall the total limits of liability available for any one occurrence or accident be less than the amount required herein. 3.5 Notice of Cancellation, Nonrenewal, or Material Reduction in Coverage. All insurance coverage shall contain the following express provision: In the event of cancellation, non-renewal, or material reduction in coverage affecting the certificate holder, thirty (30) days prior written notice shall be given to the certificate holder by certified mail or registered mail, return receipt requested. 3.6 Waiver of Subrogation. The Contractor hereby agrees to waive its rights of recovery from the Owner Parties with regard to all causes of property and/or liability loss and shall cause a waiver of subrogation endorsement to be provided in favor of the Owner Parties on all insurance coverage carried by the Contractor, whether required herein or not. 3.7 Deductible/Retention. Except as otherwise specified herein, no insurance required herein shall contain a deductible or self-insured retention in excess of $25,000 without prior written approval of the Owner. All deductibles and/or retentions shall C be paid by, assumed by, for the account of, and at the Contractor's sole risk. The Contractor shall not be reimbursed for same. 4. Maintenance of Insurance. The following insurance shall be maintained in effect with limits not less than those set forth below at all times during the term of this Agreement and thereafter as required: E 05/2007 00700-C2 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.1 Commercial General Liability Insurance 4.1.1 Coverage. Such insurance shall cover liability arising out of all locations and operations of the Contractor, including but not limited to liability L assumed under this contract (including the tort liability of another assumed in a business contract). Defense shall be provided as an additional benefit and not included within the limit of liability. 4.1.2 Form. Commercial General Liability Occurrence form (at least as broad as an unmodified ISO CG 0001 0798 or its equivalent). 4.1.3 Amount of Insurance. Coverage shall be provided with limits of not less than: Each Occurrence Limit $1,000,000 EGeneral Aggregate Limit $2,000,000 Product-Completed Operations Aggregate Limit $2,000,000 Personal and Advertising Injury Limit $1,000,000 4.1.4 Required Endorsements a. Additional Insured. Additional insured status shall be provided in favor of the Owner Parties on any of the following: i. ISO form CG 20 10 11 85; or ii. ISO form CG 20 26 11 85; or iii. a combination of ISO forms CG 20 33 10 01 and CG 20 37 10 01; or • iv. any form providing equivalent protection to Owner. b. Designated Construction Project(s) Aggregate Limit. The aggregate limit shall apply separately to this Agreement through use of an ISO CG 25 03 03 97 endorsement or its equivalent. c. Notice of Cancellation, Nonrenewal or Material Reduction in Coverage, as required in 3.5, above. d. Personal Injury Liability. The personal injury contractual liability exclusion shall be deleted. e. Primary and Non-Contributing Liability. It is the intent of the parties to this Agreement that all insurance required herein shall be primary to all insurance available to the Owner Parties. The obligations of the Contractor's insurance shall not be affected by any other insurance available to the Owner Parties and shall seek no contribution from the Owner Parties' insurance, whether primary, excess contingent, or on any other basis. The Contractor's insurance coverage shall be endorsed to provide such primary and non- contributing liability. f. Waiver of Subrogation, as required in 3.6, above. C 05/2007 00700-C3 E CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.1.5 Continuing Commercial General Liability Insurance. The Contractor shall maintain such insurance in identical coverage, form and amount, including required endorsements, for at least one (1) year following Date of Substantial Completion of the Work to be performed under this Agreement.. The Contractor shall provide written representation to Owner stating Work completion date. 4.2 Auto Liability Insurance 4.2.1 Coverage. Such insurance shall cover liability arising out of any auto (including owned, hired, and non-owned). 4.2.2 Form. Business Auto form (at least as broad as an unmodified ISO CA 0001 or its equivalent). 4.2.3 Amount of Insurance. Coverage shall be provided with a limit of not less �- than$1,000,000. 4.2.4 Required Endorsements C a. Notice of Cancellation, Nonrenewal or Material Reduction in Coverage, as required in 3.5, above. b. Waiver of Subrogation, as required in 3.6, above. 4.3 Employer's Liability Insurance 4.3.1 Coverage. Employer's Liability Insurance shall be provided as follows: 4.3.2 Amount of Insurance. Coverage shall be provided with a limit of not less than: Employer's Liability: $1,000,000 each accident and each disease. 4.3.3 Required Endorsements a. Notice of Cancellation, Nonrenewal or Material Reduction in Coverage, as required in 3.5, above. b. Waiver of Subrogation, as required in 3.6, above. 4.4 Umbrella Liability Insurance 4.4.1 Coverage. Such insurance shall be excess over and be no less broad than all coverages described above and shall include a drop-down provision for exhaustion of underlying limits. 4.4.2 Form. This policy shall have the same inception and expiration dates as the commercial general liability insurance required above. E 05/2007 00700-C4 E ECITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.4.3 Amount of Insurance. Coverage shall be provided with a limit of not less than$5,000,000. 4.4.4 Continuing Umbrella Liability Insurance. The Contractor shall maintain such insurance in identical coverage, form and amount, including required endorsements, for at least one (1) year following Date of Substantial Completion of the Work to be performed under this Agreement. The Contractor shall provide written representation to the Owner stating Work completion date. 4.5 Professional Liability Insurance 4.5.1 Coverage. The Contractor shall provide professional liability insurance for L claims arising from the negligent performance of professional services of any type, including but not limited to design or design/build services as part of the Work to be performed. 4.5.2 Form. This insurance shall include prior acts coverage sufficient to cover all services rendered by the Contractor and by its consultants under this Agreement. It is recognized that this coverage may be provided on a Claims-Made basis. 4.5.3 Amount of Insurance. provided be Coverage shall with a limit of not less than $1,000,000. 4.5.4 ContinuingProfessional LiabilityInsurance. The Contractor shall maintain such insurance in identical coverage, form and amount for at least one (1) • year following Date of Substantial Completion of the Work to be performed under this Agreement. The Contractor shall provide written representation to the Owner stating Work completion date. 4.6 Builder's Risk 4.6.1 Insureds. Insureds shall include: a. Owner, General Contactor and all Loss Payees and Mortgagees as Named Insureds; and b. subcontractors of all tiers in the Work as Additional Insureds. L r 05/2007 00700-C5 7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.6.2 Covered Property. Such insurance shall cover: 7 a. all structure(s) under construction, including retaining walls, paved Lsurfaces and roadways, bridges, glass, foundation(s), footings, underground pipes and wiring, excavations, grading, backfilling or filling; 7 b. all temporary structures (e.g., fencing, scaffolding, cribbing, false work, forms, site lighting, temporary utilities and buildings) located 7 at the site; c. all property including materials and supplies on site for installation; d. all property including materials and supplies at other locations but intended for use at the site; 7 e. all property including materials and supplies in transit to the site for installation by all means of transportation other than ocean transit; and 7 f. other Work at the site identified in the Agreement to which this Exhibit is attached. 7 Form � a. Coverage shall be at least as broad as an unmodified ISO Special 7 form, shall be provided on a completed-value basis, and shall be primary to any other coverage insurance available to the insured parties, with that other insurance being excess, secondary and non- 7 contributing. b. No protective safeguard warranty shall be permitted. c. Required coverage shall further include: 7 i. Additional expenses due to delay in $ TBD 7, completion of project(where applicable) ii. Agreed value Included without sublimit iii. Damage arising from error, omission or Included without sublimit 7 deficiency in construction methods, design, specifications,workmanship or materials, including collapse 7 iv. Debris removal additional limit 25% of direct damage loss v. Earthquake (where applicable) $ TBD 7 vi. Earthquake sprinkler leakage (where $ TBD applicable) vii. Expediting expenses $ TBD 7 viii. Flood(where applicable) $ TBD ix. Freezing Included without sublimit 7 x. Mechanical breakdown, including hot& Included without sublimit cold testing(where applicable) xi. Notice of cancellation,non-renewal or Included material reduction—60 days prior 7 written notice to each insured 05/2007 00700-C6 7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT xii. Occupancy clause, as required in F, Included below xiii. Ordinance or law Included without sublimit xiv. Pollutant clean-up and removal $ TBD L xv. Preservation of property Included without sublimit xvi. Replacement cost Included xvii. Theft Included without sublimit xviii. Waiver of subrogation as required in G, Included below. 4.6.3 Amount of Insurance. Coverage shall be provided in an amount equal at all times to the full replacement value and cost of debris removal for any single occurrence. 4.6.4 Deductibles. Deductibles shall not exceed the following: a. All Risks of Direct Damage, Per $5,000 Occurrence, except b. Delayed Opening Waiting Period 5 Days c. Flood, Per Occurrence $25,000 or excess of NFIP if in Flood Zone A, B or V d. Earthquake and Earthquake Sprinkler $25,000 Leakage, Per Occurrence 4.6.5 Termination of Coverage. The termination of coverage provision shall be endorsed to permit occupancy of the covered property being constructed so L long as such occupancy does not exceed 20% of the usable area of the property. This insurance shall be maintained in effect, unless otherwise provided for in the Contract Documents, until the earliest of the following dates: a. the date on which all persons and organizations who are insureds under the policy agree that it shall be terminated; b. the date on which final payment, as provided for in the Agreement to which this Exhibit is attached, has been made; or c. the date on which the insurable interests in the Covered Property of all insureds other than Contractor have ceased. E 05/2007 00700-C7 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 4.6.6 Waiver of Subrogation. The waiver of subrogation provision shall be endorsed as follows: a. A waiver of subrogation shall be provided in favor of all insureds. b. The waiver of subrogation provisions shall be endorsed as follows: Should a covered loss be subrogated, either in whole or in part, your rights to any recovery will come first, and we will be entitled to a recovery only after you have been fully compensated for the loss. 5. Intentionally left blank. 6. Evidence of Insurance E6.1 Provision of Evidence. Evidence of the insurance coverage required to be maintained by the Contractor, represented by certificates of insurance, evidence of insurance, and endorsements issued by the insurance company or its legal agent, and must be furnished to the Owner prior to commencement of Work and not later than fifteen (15) days after receipt of this Agreement. New certificates of insurance, evidence of insurance, and endorsements shall be provided to the Owner prior to the termination date of the current certificates of insurance, evidence of insurance, and endorsements. 6.2 Form 6.2.1 All property insurance required herein shall be evidenced by ACORD form 28, "Evidence of Property Insurance". 6.2.2 All liability insurance required herein shall be evidenced by ACORD form 25, "Certificate of Insurance". 6.3 Specifications. Such certificates of insurance, evidence of insurance, and Cendorsements shall specify: 6.3.1 The Owner as a certificate holder with correct mailing address. 6.3.2 Insured's name,which must match that on this Agreement. 6.3.3 Insurance companies affording each coverage, policy number of each coverage, policy dates of each coverage, all coverages and limits described C herein, and signature of authorized representative of insurance company. 6.3.4 Producer of the certificate with correct address and phone number listed. 6.3.5 Additional insured status required herein. 6.3.6 Amount of any deductibles and/or retentions. 6.3.7 Cancellation, non-renewal and material reduction in coverage notification as required by this Agreement. Additionally, the words "endeavor to" and "but failure to mail such notice shall impose no obligation or liability of any L' kind upon Company, it agents or representatives" shall be deleted from the cancellation provision of the ACORD 25 certificate of insurance form. 6.3.8 Designated Construction Project Aggregate Limits required herein. L 6.3.9 Personal Injury contractual liability required herein. 05/2007 00700-C8 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 6.3.10 Primary and non-contributing status required herein. 6.3.11 Waivers of subrogation required herein. 6.4 Required Endorsements. A copy of each of the required endorsements shall also be provided. 6.5 Failure to Obtain. Failure of any Owner Party to demand such certificate or other evidence of full compliance with these insurance requirements or failure of any Owner Party to identify a deficiency from evidence that is provided shall not be construed as a waiver of the Contractor's obligation to maintain such insurance. 6.6 Certified Copies. Upon request of any Owner Party, the Contractor shall provide to the Owner a certified copy of all insurance policies required herein within ten (10) days of any such request. Renewal policies, if necessary, shall be delivered to the Owner prior to the expiration of the previous policy. 6.7 Commencement of Work. Commencement of Work without provision of the required certificate of insurance, evidence of insurance and/or required endorsements, or without compliance with any other provision of this Agreement, shall not constitute a waiver by any Owner Party of any rights. The Owner shall have the right, but not the obligation, of prohibiting the Contractor or any subcontractor from performing any Work until such certificate of insurance, evidence of insurance and/or required endorsements are received and approved by the Owner. 7. Insurance Requirements of Contractor's Subcontractors 7.1 Insurance similar to that required of the Contractor shall be provided by all subcontractors (or provided by the Contractor on behalf of subcontractors) to cover operations performed under any subcontract agreement. The Contractor shall be held responsible for any modification in these insurance requirements as they apply to subcontractors. The Contractor shall maintain certificates of insurance from all subcontractors containing provisions similar to those listed herein (modified to recognize that the certificate is from subcontractor) enumerating, among other things, the waivers of subrogation, additional insured status, and primary liability as required herein, and make them available to the Owner upon request. 7.2 The Contractor is fully responsible for loss and damage to its property on the site, including tools and equipment, and shall take necessary precautions to prevent damage to or vandalism, theft, burglary, pilferage and unexplained disappearance of property. Any insurance covering the Contractor's or its subcontractor's property shall be the Contractor's and its subcontractor's sole and complete means or (�. recovery for any such loss. To the extent any loss is not covered by said insurance or subject to any deductible or co-insurance, the Contractor shall not be reimbursed for same. Should the Contractor or its subcontractors choose to self insure this risk, it is expressly agreed that the Contractor hereby waives, and shall cause its subcontractors to waive, any claim for damage or loss to said property in favor of the Owner Parties. 05/2007 00700-C9 CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT 8. Use of the Owner's Equipment. The Contractor, its agents, employees, subcontractors or �.' suppliers shall use the Owner's equipment only with express written permission of the Owner's designated representative and in accordance with the Owner's terms and condition for such use. If the Contractor or any of its agents, employees, subcontractors or suppliers utilize any of the Owner's equipment for any purpose, including machinery, tools, scaffolding, hoists, lifts or similar items owned, leased or under the control of the Owner, the Contractor shall defend, indemnify and be liable to the Owner Parties for any ( and all loss or damage which may arise from such use. 9. Release and Waiver. The Contractor hereby releases, and shall cause its subcontractors to L release, the Owner Parties from any and all claims or causes of action whatsoever which the Contractor and/or its subcontractors might otherwise now or hereafter possess resulting in or from or in any way connected with any loss covered by insurance, whether required herein or not, or which should have been covered by insurance required herein, including the deductible and/or uninsured portion thereof, maintained and/or required to be maintained by the Contractor and/or its subcontractors pursuant to this Agreement. r L' 05/2007 00700-C 10 CITY OF PEARLAND SPECIAL CONDITIONS OF AGREEMENT Section 00800 SPECIAL CONDITIONS OF AGREEMENT C The following Special Conditions modify the General Conditions,Document 00700. Where a portion of the General Conditions is modified or deleted by these Special Conditions,the unaltered portions of the General Conditions shall remain in effect. Special Provision No. 1 to Technical Specifications Delete all references to Measurement and Pay replacing with: A. Unless indicated as a bid item, no ym separate payment will be made for work p p performed under this section. Include cost in bid items for which work is a component. General Requirement Section 01200, 1.04 (B) shall be modified as follows: Payment for excavation and fill will be based on the quantities shown on the Bid Proposal. If the CONTRACTOR thinks that more or less excavation or fill is required than called for in the bid items, it should adjust the Unit Prices on its Bid Proposal accordingly. No additional compensations will be allowed for excavating or filling more or less than the indicated cubic yards of material as long as the Project is completed in accordance with the lines and grades shown in the construction drawings. If .during the course of this Contract, and in the opinion of the ENGINEER, it becomes necessary to adjust the lines and grades of the drawings,the resulting change in excavation or fill quantities will be calculated by the ENGINEER and an appropriate change order will be issued reflecting the change in E the excavation or fill quantities. Special Provision No. 1 to Technical Specifications Delete all references to Measurement and Pay replacing with A. Unless indicated as a bid item, no separate payment will be made for work performed under this section. Include cost in bid items for which work is a component. E END OF SECTION r E 09/2007 00800- 1 of 1 CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION Section 00811 WAGE SCALE FOR ENGINEERING CONSTRUCTION 1.01 In accordance with the Prevailing Wage law on Public Works (Article 2258 of the Texas Government Code),the public body awarding the contract does hereby specify the rates shown in Table 00811-A following to be the general prevailing rates in the locality in which the work is being performed. 1.02 This prevailing wage rate does not prohibit the payment of more than the rates stated. 1.03 The wage scale for engineering construction is to be applied to all site work greater than five (5) feet from an exterior wall of new building under construction or from an exterior wall of an existing building. (Attach the current wage rates. Number the pages 00811-2, 00811-3, etc.) L' r r 7_ L 07/2006 00811 - 1 of 2 7 CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION 7 Table 00811-A PREVAILING WAGE RATES FOR ENGINEERING CONSTRUCTION 7 CLASSIFICATION RATE CLASSIFICATION RATE ASPHALT RAKER , 8.28 ASPHALT PAVING MACHINE 10.05 7 ASPHALT SHOVELER 7.45 BROOM OR SWEEPER OPERATOR 8.01 BATCHING PLANT WEIGHER 11.11 BULLDOZER 9.91 CARPENTER 10.35 CONCRETE CURING MACHINE 8.80 7 CONCRETE FINISHER-PAVING 9.87 CONCRETE FINISHING MACHINE 11.79 CONCRETE FINISHER-STRUCTURES 9.86 CONCRETE JOINT SEALER 10.50 CONCRETE RUBBER 9.00 CONCRETE PAVING FLOAT 9.30 7 ELECTRICIAN 16.15 CONCRETE PAVING SAW 10.01 FLAGGER 6.66 CONCRETE PAVING SPREADER 9.32 FORM BUILDER(STRUCTURES) 9.96 SLIPFORM MACHINE OPERATOR 9.20 7 FORM LINER-PAVING&CURB 9.03 CRANE,CLAMSHELL,BACKHOE, 11.35 DERRICK,DRAGLINE,SHOVEL �r FORMSETTER(PAVING/CURB) 8.86 CRUSHER/SCREENING PLAN 11.00 1 FORM SETTER-STRUCTURES 9.05 FOUNDATION DRILL OPERATOR, 12.59 i_ CRAWLER MOUNTED LABORER-COMMON 7.45 FOUNDATION DRILL OPERATOR 12.73 TRUCK MOUNTED L LABORER-UTILITY 8.53 FRONT END LOADER 9.29 LINEPERSON 7.50 MILLING MACHINE OPERATOR 10.43 7 MANHOLE BUILDER(BRICK) 8.49 MIXER 7.94 MECHANIC 11.38 MOTOR GRADER(FINE GRADE) 11.11 OILER 9.56 MOTOR GRADER 10.67 7 SERVICER 9.51 PAVEMENT MARKING MACHINE 7.45 PAINTER-STRUCTURES 14.00 ROLLER,STEEL WHEEL PLANT 9.25 MIX PAVEMENTS C PILEDRIVER 10.96 ROLLER,STEEL WHEEL OTHER 7.61 FLATWHEEL OR TAMPING PIPE LAYER 8.49 ROLLER,PNEUMATIC,SELF PROPELLED 7.96 C ASPHALT DISTRIBUTOR 9.47 SCRAPER 8.69 TRACTOR-CRAWLER TYPE 10.12 TRACTOR-PNEUMATIC 8.99 TRAVELING MIXER 9.35 TRENCHING MACHINE-LIGHT 10.50 C .TRENCHING MACHINE-HEAVY 13.56 WAGON-DRILL,BORING MACHINE 10.15 REINFORCING STEEL SETTER(PAVING) 12.50 REINFORCING STEEL SETTER 12.47 STRUCTURES 7 STEEL WORKER-STRUCTURAL 10.35 SIGN ERECTOR 10.06 SPREADER BOX OPERATOR 9.08 SIGN INSTALLER 7.45 WORK ZONE BARRICADE 7.45 TRUCK DRIVER-SINGLE AXLE LIGHT 8.15 7 TRUCK DRIVER-SINGLE AXLE HEAVY 8.76 TRUCK DRIVER-TANDEM AXLE SEMI 8.00 TRAILER TRUCK DRIVER-LOWBOY/FLOAT 11.29 WELDER 10.43 7 END OF SECTION E 07/2006 00811 -2 of 2 7 STAKING REQUEST FORM Project Name: Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Water Lights LJA Job No.: 1129-0003 Description of Control Staking Requested: E (Note: Please describe streets, stationing, limits, type of staking, etc.) E Date Requested: Time Requested: Requested By: Phone No.: (Name, Title) Stakes Needed By: (Date) Staking Request Form must be submitted 3 working days in advance in order to assure adequate time for scheduling and staking of areas requested. All requests must be made in writing and a return phone number must be provided. Designated limits must be suitable for construction staking at time of request or request will be considered void and re-submittal will be required. SEND ALL REQUESTS TO: DARRYL DAVIS- LJA ENGINEERING &SURVEYING, INC. Fax No.: 713.953.5213 Phone No.: 713.953.5068 • E Page 1 of 1 Staking Request Form 0:\LAND\112911129-00031BIDD0CS\Water Lights BD.doc HOLD HARMLESS AGREEMENT Date: To: LJA Engineering & Surveying, Inc. Re: Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Water Lights LJA Job No: 1129-0003 E Hold harmless agreement: We have requested and are receiving electronic media containing [11_ intermediate survey and design information, not intended for construction or design. We agree to hold LJA Engineering & Surveying, Inc. harmless for any defects in this data, including all assumptions made from or using this preliminary data. We agree that it shall be our responsibility to reconcile this electronic data with the construction plans, recorded plats, and specifications, and that only the construction plans, recorded plats, and specifications shall be regarded as the contract documentation for this project. In addition, we agree not to modify this information in any way and we agree not to release this information to any other parties. E The undersigned acknowledges his/her receipt of the electronic information, concurrence with the above statement and that he/she is an officer of Hurtado Construction Company with authority to sign this document. Accepted by: Name: Title: Company: Date: L E Page 1 of 1 Hold Harmless Agreement 0:\LAND\1129\1129-0003\BIDDOCS\Water Lights BD.doc E CITY OF PEARLAND TECHNICAL SPECIFICATIONS DIVISION 1 i E TECHNIC AL SI'ECIFICATIONS DIVISION 1 GENERAL REQUIREMENTS C 04/2008 L CITY OF PEARLAND SUMMARY OF WORK Section 01100 SUMMARY OF WORK • 1.0 GENERAL 1.01 SECTION INCLUDES A A summary of the Work to be performed under this Contract,work by Owner,Owner furnished products, Work sequence, future Work, Contractor's use of Premises, and Owner occupancy. 1.02 WORK COVERED BY CONTRACT DOCUMENTS A Work of the Contract is for the construction of : Water, Sanitary Sewer and Drainage Facilites to Serve Water Lights 1.03 WORK BY OWNER A N/A 1.04 OWNER FURNISHED PRODUCTS A Center line control B staking. 1.05 WORK SEQUENCE A N/A B Contractor to submit project schedule to Engineer& Owner for approval as specified in Section 01300—Submittals. C Contractor shall coordinate the Work with the Engineer and Owner as specified in Section 01040 - Coordination and Meetings. 1.06 FUTURE WORK L A N/A 1.07 CONTRACTOR'S USE OF PREMISES A Comply with procedures for access to the site and Contractor's use of rights-of-way as Cspecified in Section 01140 - Contractor's Use of Premises. B Contractor shall be responsible for all utilities required for construction. 1.08 OWNER OCCUPANCY A Cooperate with the Owner to minimize conflict, and to facilitate the Owner's operations. Coordinate Contractor's activities with Engineer. 05/2008 01100- 1 of 2 7 CITY OF PEARLAND SUMMARY OF WORK B Schedule Work to accommodate this requirement. �I 2.0 PRODUCTS -NotUsed 7 3.0 EXECUTION-NotUsed 7 END OF SECTION j J 7 J 1 T 05/2008 01100-2 of 2 CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES Section 01140 CONTRACTOR'S USE OF PREMISES ^j 1.0 GENERAL 1.01 SECTION INCLUDES A General use of the Project Site including properties inside and outside of the limits of construction, work affecting roads, ramps, streets and driveways and notification to adjacent occupants. B References to Technical Specifications: 1 Section 01350—Submittals 2 Section 01730—Cutting&Patching ""I 3 Section 01555—Traffic Control&Regulation 4 Section 01562—Waste Material Disposal 5 Section 01720—Field Surveying ^� 6 Section 02980—Pavement Repair 7 Section 02770—Curbs, Curb &Gutter, &Headers 8 Section 02255—Bedding, Backfill, &Embankment Materials "1 9 Section 02922—Sodding 10 Section 02921 —Hydromulch Seeding 1.02 SUBMITTALS T A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1.03 LIMITS OF CONSTRUCTION A Confine access,operations,and storage areas to limits of construction as shown on the 7 Plans provided by Owner as stipulated in Section 00700 — General Conditions of Agreement; trespassing on abutting lands or other lands in the area is not allowed. B Contractor may make arrangements,at Contractor's cost,for temporary use of private properties,in which case Contractor and Contractor's surety shall indemnify and hold '1{ harmless the Owner against claims or demands arising from such use of properties outside of the limits of construction. 1. Improvements to private properties made for the Contractor's use must be removed upon completion of the Work. a. No fill material may be placed in temporary work areas or on adjacent private properties without the written permission of the Engineer or the issuance of a Fill Permit by the City of Pearland or other governing entity. C Restrict total length which materials may be distributed along the route of the construction at any one time to 1,000 linear feet unless otherwise approved by Engineer. 02/2008 01140- 1 of 4 1 r CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES 1.04 PROPERTIES OUTSIDE OF LIMITS OF CONSTRUCTION A Altering the condition of properties adjacent to and along the limits of construction will not be permitted unless authorized by the Engineer and property owner(s). CB Means,methods,techniques,sequences,or procedures which will result in damage to properties or improvements in the vicinity outside of the limits of construction will not be permitted. C Any damage to properties outside of the limits of construction shall be repaired or replaced to the satisfaction of the Engineer and at no cost to the Owner. D Contractor shall protect or replace all property corners,monuments or other demarcations disturbed, damaged or lost as a result of his activities. The replacement of these devices shall be properly documented to the satisfaction of the City by a Registered Public Land Surveyor with copies delivered to the Owner or private property owner. 1.05 USE OF SITE A Obtain approvals of governing authorities prior to impeding or closing public roads or streets. Do not close consecutive intersections simultaneously. B Notify Engineer 48 hours prior to closing a street or a street crossing. Permits for street closures are required in advance and are the responsibility of the Contractor. C Maintain access for emergency vehicles including access to fire hydrants. D Avoid obstructing drainage ditches or inlets; when obstruction is unavoidable due to requirements of the Work, provide grading and temporary drainage structures to maintain unimpeded flow. E Locate and protect private lawn sprinkler systems which may exist on rights-of-ways within the Project Site. Repair or replace damaged systems to condition equal to or better than that existing at start of the Work. �.v F When required by the Work, cutting, patching, and fitting of Work to existing facilities,accommodating installation or connection of Work with existing facilities,or uncovering Work for access, inspection, or testing shall be performed in accordance with Section 01730—Cutting&Patching. G Fires are not permitted on the Project Site. 1.06 NOTIFICATION TO ADJACENT OCCUPANTS A Notify individual occupants in areas to be affected by the Work of the proposed construction and time schedule. Notification shall be 24 hours, 72 hours and 2 weeks prior to work being performed within 200 feet of the homes or businesses. 02/2008 01140-2 of 4 CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES J B Include in notification names and telephone numbers of two representatives for resident contact,who will be available on 24-hour call. Include precautions which will !� be taken to protect private property and identify potential access or utility inconvenience or disruption. C Submit proposed notification to Engineer for approval. Consideration shall be given to the ethnicity of the neighborhood where English is not the dominant language. Notice shall be in an understandable language. 1.07 EXCAVATION IN STREETS AND DRIVEWAYS A Avoid hindering or needlessly inconveniencing public travel on a street or any intersecting alley or street for more than two blocks at any one time, except by i permission of the Engineer. B Obtain the Engineer's approval when the nature of the Work requires closing of an entire street. Permits required for street closure are the Contractor's responsibility. Avoid unnecessary inconvenience to abutting property owners. C Remove surplus materials and debris and open 1000 feet or less for public use as work in that block is complete. D Acceptance of any portion of the Work will not be based on return of street to public use. E Avoid obstructing driveways or entrances to private property. F Provide temporary crossing or complete the excavation and backfill in one continuous operation to minimize the duration of obstruction when excavation is required across drives or entrances. G Provide barricades and signs in accordance with Section 01555—Traffic Control & Regulation. 1.08 CLEAN-UP A Maintain Project Site in a neat and orderly manner. B Perform daily clean-up in and around construction zone of dirt,debris,scrap materials, other disposable items. C Leave streets, driveways, and sidewalks broom-clean or its equivalent at the end of each work day. D Promptly remove barriers,signs,and components of other control systems that are no longer being utilized. E Dispose of waste and excess materials in accordance with requirements of Section 01562—Waste Material Disposal. 02/2008 01140-3 of 4 7 CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES 1.09 RESTORATION A Restore damaged permanent facilities to pre-construction conditions unless replacement or abandonment of facilities is indicated on the Plans. B Repair/Replace removed or damaged pavement in accordance with Section 02980— Pavement Repair and removed or damaged curbs,gutters,and headers in accordance with Section 02770— Curbs, Curb & Gutter, & Headers. Repair/Replace with like materials to match existing style, lines, grades, etc., unless otherwise directed by Engineer. C Repair turf areas which become damaged by Contractor's operations at no additional cost to Owner. Level with bank sand or topsoil, conforming to Section 02255—Bedding,Backfill, & Embankment Materials, as approved by the Engineer. Provide sodding in areas of residential land use over the surface of ground disturbed during construction and not paved, or not designated to be paved,in accordance with Section 02922—Sodding. Use only block sodding; do not use spot sodding or sprigging Provide hydromulch seeding in areas of commercial,industrial or undeveloped land use over the surface of ground disturbed during construction and not paved,or not designated to be paved, in accordance with Section 02921 —Hydromulch Seeding. Water and level newly sodded areas with adjoining turf using steel wheel rollers appropriate for sodding. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION E 02/2008 01140-4 of 4 CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES Section 01200 MEASUREMENT AND PAYMENT PROCEDURES 1.0 GENERAL 1.01 SECTION INCLUDES rA Procedures for measurement and payment of Work. B Conditions for nonconformance assessment and nonpayment for rejected products. C References to Technical Specifications: See Bid Proposal Sheet D Reference Standards: E1. Concrete Reinforcing Steel Institute (CRSI) 2. American Institute of Steel Construction (AISC) 1.02 AUTHORITY ( A Units and methods delineated in this Section are intended to complement the criteria of the Technical Specifications and Section 00300—Bid Proposal. B In the event of conflict, the unit specified for Bid Items in Section 00300 — Bid Proposal shall govern. C Measurements and quantities submitted by the Contractor will be verified by the Engineer. D Contractor shall necessary equipment,provide q pment, workers, and survey personnel as required by Engineer to verify quantities. 1.03 UNIT QUANTITIES SPECIFIED • A Quantity and measurement estimates stated in Section 00300—Bid Proposal are for contract purposes only. Quantities and measurements supplied or placed in the Work, authorized and verified by Engineer shall determine payment as stated in Section 00700—General Conditions of Agreement. B If the actual Work requires greater or lesser quantities than those quantities indicated in Section 00300 — Bid Proposal, provide the required quantities at the unit prices contracted except as otherwise stated in Section 00700 — General Conditions of Agreement or in executed Change Order. 1.04 MEASUREMENT OF QUANTITIES A Measurement by Weight: Reinforcing steel, rolled or formed steel or other metal shapes will be measured by CRSI or AISC Manual of Steel Construction weights. Welded assemblies will be measured by CRSI or AISC Manual of Steel Construction or scale weights. 05/2007 01200- 1 of 3 1 CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES B Measurement by Volume: 1. Stockpiles: Measured by cubic dimension using mean length, width, and height or thickness. 2. Excavation and Embankment Materials: Measured by cubic dimension using the average end area method. C Measurement by Area: Measured by square dimension using mean length and width or radius. D Linear Measurement: Measured by linear dimension, at the item centerline or mean chord. E Stipulated Price Measurement:. By unit designated in the agreement. F Other: Items measured by weight, volume, area, or lineal means or combination, as appropriate, as a completed item or unit of the Work. 1.05 PAYMENT A Payment includes full compensation for all required supervision,labor,products,tools, equipment,plant,transportation,services,and incidentals;and erection,application or installation of an item of the Work; and Contractor's overhead and profit. The price bid shall include the total cost for required Work. Claims for payment as Unit Price Work not specifically covered in Section 00300—Bid Proposal will not be accepted. B Progress Payments for Unit Price Work will be based on the Engineer's observations and evaluations of quantities incorporated in the Work multiplied by the unit price. 7 C Progress Payments for Lump Sum Work will be based on the Engineer's observations and evaluations of the percentage of quantities included in the schedule of values incorporated in the Work. 1 D Final Payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities determined by Engineer multiplied by the unit price for Work which is incorporated in or made necessary by the Work. 1.06 NONCONFORMANCE ASSESSMENT A Remove and replace the Work, or portions of the Work, not conforming rmrng to the Contract Documents. B If,in the opinion of the Engineer,it is not practical to remove and replace the Work, the Engineer will direct one of the following remedies: 1. The nonconforming Work will remain as is, but the unit price will be adjusted to a lower price at the discretion of the Engineer. 2. The nonconforming Work will be modified as authorized by the Engineer, and the unit price will be adjusted to a lower price at the discretion of the Engineer,if the modified Work is deemed to be less suitable than originally specified. 05/2007 01200-2of3 1 CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES C Individual Technical Specifications may modify these options or may identify a specific formula or percentage price reduction. D The authorityof theEngineer 8 to assess the nonconforming Work and identify payment adjustment is final. 1.07 NONPAYMENT FOR REJECTED PRODUCTS A Payment will not be made for any of the following: 1. Products wasted or disposed of in a manner that is not acceptable to Engineer. 2. Products determined as nonconforming before or after placement. 3. Products not completely unloaded from transporting vehicle. 4. Products placed beyond the lines and levels of the required Work. 5. Products remaining on hand after completion of the Work, unless specified otherwise. 6. Loading, hauling, and disposing of rejected products. 2.0 PRODUCTS - NotUsed 3.0 EXECUTION - NotUsed EN D OF SECTION E L E 05/2007 01200-3 of 3 CITY OF PEARLAND CHANGE ORDER PROCEDURES Section 01290 CHANGE ORDER PROCEDURES 1.0 GENERAL 1.01 SECTION INCLUDES A Procedures for processing Change Orders, including: 1. Assignment of a responsible individual for approval and communication of changes in the Work; 2. Documentation of change in Contract Price and Contract Time; 3. Change procedures,using proposals and construction contract modifications, Work Change Directive, Stipulated Price Change Order, Unit Price Change Order,Time and Materials Change Order; 4. Execution of Change Orders; 5. Correlation of Contractor Submittals. CB References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01760—Project Record Documents C Other References: 1. Rental Rate Blue Book for Construction Equipment(Data Quest Blue Book). Rental Rate is defined as the full unadjusted base rental rate for the appropriate item of construction equipment. 1.02 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 - Submittals. 1.03 RESPONSIBLE INDIVIDUAL A Contractor shall provide a letter indicating the name and address of the individual authorized to execute change documents, and who shall also be responsible for informing others in Contractor's employ and Subcontractors of changes to the Work. The information shall be provided at the Preconstruction Conference. 1.04 DOCUMENTATION OF CHANGE IN CONTRACT PRICE AND CONTRACT TIME A Provide full information required for identification and evaluation of proposed changes, and to substantiate costs of proposed changes in the Work. B Contractor shall document each Proposal for Change in cost or time with sufficient data to allow for its evaluation. 02/2008 01290- 1 of 4 CITY OF PEARLAND CHANGE ORDER PROCEDURES C Proposal for Change shall include, as a minimum, the following information as applicable: 1. Original Quantities of items in Section 00300—Bid Proposal with additions, reductions, deletions, and substitutions. 2. When Work items were not included in Section 00300—Bid Proposal, Contractor shall provide unit prices for the new items, with supporting information as required by the Engineer. 3. Justification for any change in Contract Time. 4. Additional data upon request. D For changes in the Work performed on a time-and-material basis, the following additional information may be required: 1. Quantities and description of products and equipment. 2. Taxes, insurance and bonds. 3. Overhead and profit as noted in Section 00700—General Conditions of Agreement, 7.03 "Extra Work". 4. Dates and times work was performed, and by whom. 5. Time records and certified copies of applicable payrolls. 6. Invoices and receipts for products,rented equipment, and subcontracts, similarly documented. E Rented equipment will be paid to the Contractor by actual invoice cost for the duration of time required to complete the extra work. If the extra work comprises only a portion of the rental invoice where the equipment would otherwise be on the site,the Contractor shall compute the hourly equipment rate by dividing the actual monthly invoice by 176. (One day equals 8 hours and one week equals 40 hours.) Operating costs shall not exceed the estimated operating costs given for the item of equipment in the Blue Book. F For changes in the work performed on a time-and-materials basis using Contractor- owned equipment, compute rates with the Blue Book as follows: 1. Multiply the appropriate Rental Rate by an adjustment factor of 70 percent plus the full rate shown for operating costs. The Rental Rate utilized shall "1 be the lowest cost combination of hourly, daily, weekly or monthly rates. Use 150 percent of the Rental Rate for double shifts (one extra shift per day) and 200 percent of the Rental Rate for more than two shifts per day. No other rate adjustments shall apply. 2. Standby rates shall be 50 percent of the appropriate Rental Rate shown in the Blue Book. Operating costs will not be allowed. 1.05 CHANGE PROCEDURES A Changes to Contract Price or Contract Time can only be made by issuance of a Change Order. Issuance of a Work Change Directive or written acceptance by the Engineer of changes will be formalized into Change Orders. All such changes will be in accordance with the requirements of Section 00700 — General Conditions of Agreement, 7.01 "Change Orders". T 02/2008 01290-2 of 4 smi CITY OF PEARLAND CHANGE ORDER PROCEDURES B The Engineer gi r will advise Contractor of Minor Changes in the Work not involving an adjustment to Contract Price or Contract Time as authorized by Section 00700 — General Conditions of Agreement, 7.02 "Minor Changes", by issuing supplemental instructions. C Contractor may request clarification of Plans, Technical Specifications or Contract Documents or other information. Response by the Engineer to a Request for Information does not authorize the Contractor to perform tasks outside the scope of the Work. All changes must be authorized as described in this Section. 1.06 PROPOSALS FOR CHANGE AND CONTRACT MODIFICATION A The Engineer may issue a Request for Proposal,which includes a detailed description of a proposed change with supplementary or revised Plans and Technical Specifications.The Engineer may also request a proposal in the response to a Request for Information. Contractor will prepare and submit its Proposal for Change within 7 days or as specified in the request. B The Contractor may propose an unsolicited change by submitting a Proposal for Change to the Engineer describing the proposed change and its full effect on the Work, with a statement describing the reason for the change and the effect on the Contract Price and Contract Time including full documentation. 1.07 WORK CHANGE DIRECTIVE A Engineer may issue a signed Work Change Directive instructing the Contractor to proceed with a change in the Work,for subsequent inclusion in a Change Order. B The document will describe changes in the Work and will designate a method of determining any change in Contract Price or Contract Time. C Contractor shall proceed promptly to execute the changes in the Work in accordance with the Work Change Directive. 1.08 STIPULATED PRICE CHANGE ORDER A A Stipulated Price Change Order will be based on an accepted Proposal for Change including the Contractor's lump sum price quotation. 1.09 UNIT PRICE CHANGE ORDER A Where Unit Prices for the affected items of the Work are included in Section 00300- Bid Proposal , the Unit Price Change Order will be based on unit prices as originally Cbid, subject to provisions of Section 00700—General Conditions of Agreement. B Where unit prices of the Work are not pre-determined in Section 00300 — Bid Proposal, Work Change Directive or accepted Proposal for Change will specify the unit prices to be used. 02/2008 01290-3 of 4 E 1 CITY OF PEARLAND CHANGE ORDER PROCEDURES 1.10 TIME-AND-MATERIAL CHANGE ORDER • A Contractor shall provide an itemized account and supporting data after completion of change,within time limits indicated for claims in Section 00700—General Conditions of Agreement. B Engineer will determine the change allowable in Contract Price and Contract Time as provided in Section 00700—General Conditions of Agreement. C Contractor shall maintain detailed records of work done on time-and-material basis as specified in this Section, 1.04 "Documentation of Change in Contract Price and Contract Time". D Contractor shall provide full information required for evaluation of changes,and shall substantiate costs for changes in the Work. 1 1.11 EXECUTION OF CHANGE DOCUMENTATION A Engineer will issue Change Orders, Work Change Directives, or accepted Proposals 1 for Change for signatures of parties named in Section 00500 — Standard Form of Agreement. 1.12 CORRELATION OF CONTRACTOR SUBMITTALS A For Stipulated Price Contracts, Contractor shall promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Price. B For Unit Price Contracts,the next monthly Application for Payment of the Work after acceptance of a Change Order will be revised to include any new items not previously included and the appropriate unit rates. 1 C Contractor shall promptly revise progress schedules to reflect any change in Contract Time, and shall revise schedules to adjust time for other items of work affected by the change, and resubmit for review. D Contractor shall promptly enter changes to the on-site and record copies of the Plans, Technical Specifications or Contract Documents as required in Section 01760 — Project Record Documents. 2.0 PRODUCTS - Not Used 7 3.0 EXECUTION - NotUsed END OF SECTION 1 02/2008 n 01290-4of4 7 1 CITY OF PEARLAND COORDINATION AND MEETINGS Section 01310 COORDINATION AND MEETINGS 1.0 GENERAL 1.01 SECTION INCLUDES A Section includes general coordination including Preconstruction Conference, Site Mobilization Conference, and Progress Meetings. B References to Technical Specifications: 1. Section 01100—Summary of Work 1.02 RELATED DOCUMENTS A Coordination is required throughout the documents. Refer to all of the Contract Documents and coordinate as necessary. 1 1.03 ENGINEER AND REPRESENTATIVES A The Engineer may act directly or through designated representatives as defined in Section 00700 — General Conditions of Agreement, 1.01 "Owner, Contractor, and Engineer", and as identified by name at the Preconstruction Conference. 1.04 CONTRACTOR COORDINATION A Coordinate scheduling,submittals,and work of the various Technical Specifications to assure efficient and orderly sequence of installation of interdependent construction elements. B Coordinate completion and clean up of the Work for Substantial Completion and for portions of the Work designated for Owner's partial occupancy. C Coordinate access to Project Site for correction of nonconforming work to minimize disruption of Owner's activities where Owner is in partial occupancy. 1.05 PRECONSTRUCTION CONFERENCE A Engineer will schedule a Preconstruction Conference. B Attendance Required: Engineer's representatives,Consultants,Contractor,and major Subcontractors. C Agenda: 1. Distribution of Contract Documents. 2. Designation of personnel representing the parties to the Contract, and the 7 Consultant. 3. Review of insurance. 02/2008 01310- 1 of 3 I J 7 CITY OF PEARLAND COORDINATION AND MEETINGS 7 4. Discussion of formats proposed by the Contractor for Schedule of Values, and Construction Schedule. 7 5. Discussion of required Submittals, including, but not limited to,Work Plans, Traffic Control Plans, Safety Programs, Construction Photographs. 7 6. Procedures and processing of Shop Drawings and other submittals, substitutions, Applications for Payment, Requests for Information, Request for Proposal, Change Orders,and Contract Closeout. 7. Scheduling of the Work and coordination with other contractors. C8. Review of Subcontractors. 9. Appropriate agenda items listed in this Section, 1.06 "Site Mobilization Conference", when Preconstruction Conference and Site Mobilization CConference are combined. 10. Procedures for testing. 11. Procedures for maintaining Project Record Documents. 7 . 12. Designation of the individual authorized to execute change documents and their responsibilities. 13. Discussion of requirements of a Trench Safety Program. 7 1.06 SITE MOBILIZATION CONFERENCE 7 A When required by Section 01100—Summary of Work,Engineer will schedule a Site Mobilization Conference at the Project Site prior to Contractor occupancy. B Attendance Required: Engineer representatives, Consultants, Contractor's 7 Superintendent, and major Subcontractors. C Agenda: 7 1. Use of premises by Owner and Contractor 2. Safety and first aid procedures 3. Construction controls provided by Owner 7 4. Temporary utilities 5. Survey and layout 6. Security and housekeeping procedures 7 1.07 PROGRESS MEETINGS 7 A Progress Meetings shall be held at Project Site or other location as designated by the [_ Engineer. Meeting shall be held at monthly intervals, or more frequent intervals if directed by Engineer. 7 B Attendance Required: Job superintendent, major Subcontractors and suppliers, Engineer representatives, and Consultants as appropriate to agenda topics for each 7 meeting. C Engineer or City's representative will make arrangements for meetings,and recording minutes. 7 D Engineer or City's representative will prepare the agenda and preside at meetings. 7 02/2008 01310-2 of 3 7 CITY OF PEARLAND COORDINATION AND MEETINGS E Contractor shall provide required information and be prepared to discuss each agenda item. F Agenda: 1. Review minutes of previous meeting. 7 2. Review of Construction Schedule,Applications for Payment, payroll and j compliance submittals. 3. Field observations,problems, and decisions. 4. Identification of problems which impede planned progress. 5. Review of Submittal Schedule and status of submittals. 6. Review status of Requests for Information, Requests for Proposal. 7. Review status of Change Orders. 8. Review of off-site fabrication and delivery schedules. 9. Maintenance of updates to Construction Schedule. ,..� 10. Corrective measures to regain projected schedules. 1 11. Planned progress during succeeding work period. 12. Coordination of projected progress. 13. Maintenance of quality and work standards. 14. Effect of proposed changes on Construction Schedule and coordination. 15. Other items relating to the Work. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION J 7] 1 7 7I 02/2008 01310-3 of 3 CITY OF PEARLAND SUBMITTALS ^� Section 01350 SUBMITTALS 1.0 GENERAL This Section contains general lists of Submittals and Technical Specifications that may be required for the Work. When Submittals are required elsewhere in these Technical Specifications, refer to this Section for Submittal requirements and procedures. 1.01 SECTION INCLUDES A Submittal procedures for: 1. Schedule of Values 2. Construction Schedules 1 3. Shop Drawings,Product Data, and Samples 4. Operations and Maintenance Data 5. Manufacturer's Certificates "1 6. Construction Photographs 7. Project Record Documents 8. Design Mixes 1 B References to the following Technical Specifications: 1. Section 01310—Coordination &Meetings 2. Section 01630—Product Options &Substitutions 3. Section 01100—Summary of Work 4. Section 01380—Construction Photographs 5. Section 01760—Project Record Documents 6. Section 02530—Gravity Sanitary Sewers 1.02 SUBMITTAL PROCEDURES A Scheduling and Handling 1. Schedule Submittals well in advance of the need for material or equipment for construction. Allow time to make delivery of material or equipment after Submittal is approved. 2. Develop a Submittal Schedule that allows sufficient time for initial review, correction,resubmission and final review of all submittals. The Engineer will review and return submittals to the Contractor as expeditiously as possible but the amount of time required for review will vary depending on the complexity and quantity of data submitted. In no case will a Submittal Schedule be acceptable which allows less than 30 days for initial review by the Engineer. —{ This time for review shall in no way be justification for delays or additional compensation to the Contractor. 3. The Engineer's review of submittals covers conformity to the Plans,Technical ^� Specifications, and dimensions which affect the layout. The Contractor is I responsible for quantity determination. The Contractor is responsible for any errors, omissions or deviations from the Contract requirements; review of 01/2008 01350- 1 of 6 71 CITY OF PEARLAND SUBMITTALS submittals in no way relieves the Contractor from his obligation to furnish required items according to the Plans and Technical Specifications. 4. Submit 5 copies of documents unless otherwise specified in this Section or by individual Technical Specifications. 5. Revise and resubmit submittals as required. Identify all changes made since previous submittal. 6. The Contractor shall assume the risk for material or equipment which is bic did pr N mtiipm be incorporatedfaratedor intoel vere the Workprior orto ap includedoval. in o Applicationsaer alor forequ Paymententshall until approval has been obtained in the specified manner. B Transmittal Form and Numbering 1. Transmit each submittal to the Engineer with a transmittal form. 2. Sequentially number each transmittal form beginning with the number 1. Re- Submittals shall use the original number with an alphabetic suffix(i.e.,2A for L first Re-Submittal of Submittal 2 or 15C for third Re-Submittal of Submittal 15). Each submittal shall only contain one type of work, material, or equipment. Mixed submittals will not be accepted. 3. Identify variations from requirements of Contract Documents and identify product or system limitations. 4. For submittal numbering of video tapes, see this Section, 1.10"Video". C Contractor's Certification 1. Each submittal shall contain a statement or stamp signed by the Contractor, certifying that the items have been reviewed in detail and are correct and in accordance with Contract Documents, except as noted by any requested variance. 1.03 SCHEDU LE OF VALUES A Submit a Schedule of Values at least 10 days prior to the first Application for Payment. A Schedule of Values shall be provided for each of the items indicated as Lump Sum (LS) in Section 00300 —Bid Proposal for which the Contractor requests to receive Progress Payments. B Schedule of Values shall be typewritten on 8-1/2"x 11",plain bond,white paper. Use the Table of Contents of this Project Manual as a format for listing costs of Work by Section. C C Round off figures for each listed item to the nearest$100.00 except for the value of one item, if necessary, to make the total price for all items listed in the Schedule of Values equal to the applicable Lump Sum in Section 00300—Bid Proposal. D For Unit Price Contracts, items should include a proportional share of Contractor's overhead and profit, such that the total of all items listed in the Schedule of Values equals the Contract amount. For Stipulated Price Contracts,Mobilization,Bonds,and Insurance may be listed as separate items in the Schedule of Values. 01/2008 01350-2of6 I CITY OF PEARLAND SUBMITTALS r" E For Lump Sum equipment items, where Submittals for Testing, Adjusting, and Balancing Reports in conjunction with Operation and Maintenance Data are required, include a separate item for equipment Operation and Maintenance Data Submittals and a separate item for Submittals of equipment Testing, Adjusting, and Balancing Reports, each valued at five (5)percent of the Lump Sum. F Revise the Schedule of Values and resubmit for items affected by contract modifications,Change Orders,and Work Change Directives. Submit revised Schedule of Values 10 days prior to the first Application for Payment after the changes are approved by the Engineer. 1.04 CONSTRUCTION SCHEDULES A Submit Construction Schedules for the Work in accordance with the requirements of this Section. The Construction Schedule Submittal shall be,at a minimum,a bar chart, (computer generated or prepared manually) and a narrative report. B During the Preconstruction Meeting, as noted in Section 01310 - Coordination and Meetings, the Contractor shall provide a sample of the format to be used for the 1 Construction Schedule Submittal. The format is subject to approval by the Engineer. Review of the Submittal will be provided within 7 days of the Submittal of the sample. C Within 7 days of the receipt of approval of the Contractor's format, or 14 days of the Notice to Proceed, whichever is later, the Contractor shall submit a proposed Construction Schedule for review. The Construction Schedule Submittal shall meet the following requirements: 1. The Construction Schedule shall usually include a total of at least 20 but not more than 50 activities. Fewer activities may be accepted,if approved by the Engineer. 2. For Projects with work at different physical locations,each location should be indicated separately within the Construction Schedule. 3. For projects with multiple crafts or significant subcontractor components,these elements should be indicated separately within the Construction Schedule. 4. For Projects with multiple types of tasks within the scope,these types of work should be indicated separately within the Construction Schedule. 5. For Projects with significant major equipment items or materials worth over 25 7 percent of the Total Contract Price, the Construction Schedule shall indicate dates when these items are to be purchased,when they are to be delivered,and when installed. 6. For Projects where operating plants are involved, each period of work which will require the shut down of any process or operation shall be identified in the Construction Schedule and must be agreed to by the Engineer prior to starting work in the area. 7. A Billing Schedule(tabulation of the estimated monthly billings)for the Work shall be prepared and submitted by the Contractor with the first Construction Schedule. This information is not required in the monthly updates, unless significant changes in Work require re-submittal of the Construction Schedule for review. The total for each month and a cumulative total will be indicated. 01/2008 01350-3 of 6 1 7 CITY OF PEARLAND SUBMITTALS 7 These monthly forecasts are only for planning purposes of the Engineer. Monthly payments for actual work completed will be made by the Engineer in 7 accordance with Section 00700- General Conditions of Agreement. D The Contractor must receive approval of the Engineer for the Construction Schedule P and Billing Schedule prior to the first monthly Application for Payment. No payment will be made until these are accepted. 7 E Upon written request from the Engineer, the Contractor shall revise and submit for approval all or any part of the Construction Schedule to reflect changed conditions in the Work or deviations made from the original plan and schedule. 7 F The Contractor's Construction Schedule shall thereafter be updated with the Actual Start and Actual Finish Dates, Percent Complete, and Remaining Duration of each Activity and submitted monthly. The date to be used in updating the monthly 7 Construction Schedule shall be the same Date as is used in the monthly Application for Payment. This monthly update of the Construction Schedule shall be required before 7 the monthly Application for Payment will be processed for payment. G The narrative Construction Schedule Report shall include a description of changes made to the Construction Schedule; Activities Added to the Construction Schedule; 7 Activities Deleted from the Construction Schedule; any other changes made to the Construction Schedule other than the addition of Actual Start Dates and Actual Finish Dates and Remaining Durations. 7 1.05 SHOP DRAWI NGS,PRODUCT DATA,AND SAMPLES 7 A Shop Drawings 1. Submit Shop Drawings for review as required by the Technical Specifications. 2. Contractor's Certification, as described in this Section, 1.02 "Submittal 7 Procedures" shall be placed on each Shop Drawing. 3. The Shop Drawing shall accurately and distinctly present the following: a. Field and erection dimensions clearly identified as such. C- L- b. Arrangement and section views. c. Relation to adjacent materials or structure including complete information for making connections between work under this Contract 7 and work under other contracts. d. Kinds of materials and finishes. e. Parts list and descriptions. Cf. Assembly Shop Drawings of equipment components and accessories showing their respective positions and relationships to the complete equipment package. 7 g. Where necessary for clarity, identify details by reference to sheet numbers and detail numbers, schedule or room numbers as shown on the Plans. C 4. Shop Drawing Drawings shall be to scale,and shall be a true representation of the specific equipment or item to be furnished. 7 01/2008 01350-4 of 6 7 CITY OF PEARLAND SUBMITTALS B Product Data 1. Submit Product Data for review when required in individual Technical Specifications. 2. Contractor's Certification, as described in this Section, 1.02 "Submittal Procedures" shall be placed on each data item submitted. 3. Mark each copy to identify applicable products,models, options to be used in this Project. Supplement manufacturers'standard data to provide information unique to this Project, where required by the Technical Specification. 4. For products specified only by reference standard,submit manufacturer,trade name, model or catalog designation, and applicable reference standard. 5. For Approved Products, those designated in the Technical Specifications followed by the words"or approved equal",submit manufacturer,trade name, model or catalog designation, and applicable reference standard. 6. For products proposed as alternates to Approved Products, refer to Section 01630-Product Options and Substitutions, 1.04"Selection Options"and 1.07 "Substitution Procedures". 7. For products that are neither Pre-Approved, Approved, specified only by reference standard, nor proposed as alternates, submit product description, trade name, manufacturer, and supplier. Contractor shall provide additional information upon written request by Engineer or Owner. C Samples 1. Submit samples for review as required by the Technical Specification. 2. Contractor's Certification, as described in this Section, 1.02 "Submittal Procedures", shall be placed on each sample or a firmly attached sheet of paper. 3. Submit the number of samples specified in the Technical Specification;one of which will be retained by the Engineer. 4. Reviewed samples which may be used in the Work are identified in the Technical Specifications. 1.06 OPERATIONS AND MAINTENANCE DATA A When specified in Technical Specification,submit manufacturers'printed instructions for delivery, storage, assembly, installation, start-up, operation, adjusting, finishing, and maintenance. B Contractor's Certification, as described in this Section. 1.02 "Submittal Procedures", shall be placed on front page of each document. C Identify conflicts between manufacturers'instructions and Contract Documents. 1.07 MANUFACTURER'S CERTIFICATES A When specified in Technical Specification, submit manufacturers' certificate of compliance for review by Engineer. 7 B Contractor's Certification, as described in this Section, 1.02"Submittal Procedures", shall be placed on front page of the certificate. 7] 01/2008 01350-5 of 6 J C CITY OF PEARLAND SUBMITTALS 7 C Subm it supporting reference data, affidavits, and certifications as appropriate. 7 D Manufacturer's Certificates may be recent or previous test results on material or product, but must be acceptable to Engineer. C1.08 CONSTRUCTION PHOTOGRAPHS 7 A Submit photographs in accordance with Section 01380—Construction Photographs. 1. Prints: Prepare 2 prints of each view and submit 1 print directy to the City's Representative within 7 days of taking photographs. One print shall be retained by the Contractor and made available at all times for reference on the job site. 7 B PRECONSTRUCTION PHOTOGRAPHS: 1. Prior to the commencement of any construction,take digital color photographs 7 on the entire route of the project 2. Photographs: Two prints, color, matte finish; 3 x 5 inch size,mounted on 81/2 x 11-inch soft card stock, with left edge binding margin for three hole punch, or in plastic pockets in three-ring notebook. 7 3. Th photographs shall show: a. Date photographs were taken b. Location of the photograph, house number and street name. (This 7 information may be shown on a chalk board in the photograph of by a label on the mountings.) 4. Photographs should show the confition of the following 7 a. Eslpanades and boulevards b. Yards (near, side and far side of street) 7 c. Housewalk, sidewalk and driveway; curb d. Area between walk and curb 1) Particular features(yard lights, shrubs, fences, trees, etc.) 7 2) Landscaping and decorative features. C POST CONSTRUCTION PHOTOGRAPHS 7 1. On completion of construction,provide photographs of any public or private property which has been repaired or restored and any damage which is or may �` be the subject of complaints. L 1.09 PROJECT RECORD DOCUMENTS 7 A Submit Project Record Documents in accordance with Section 01760—Project Record Documents. 1.10 VIDEO 7 A Submit television video in DVD format as required in individual Technical Specifications. CB Transmittal forms for video disks shall be numbered sequentially beginning q y g g with TO1, T02, T03, etc. 7 01/2008 01350-6 of 6 7 CITY OF PEARLAND SUBMITTALS 1.11 DESIGN MIXES A When specified, submit design mixes for review. B Contractor's Certification, as described in this Section, 1.02"Submittal Procedures", shall be placed on front page of each design mix. C Mark each design mix to identify proportions,gradations,and additives for each class and type of design mix submitted. Include applicable test results on samples for each 7] mix. D Maintain a copy of approved design mixes at mixing plant. 2.0 PRODUCTS - NotUsed 3.0 EXECUTION - NotUsed j J END OF SECTION I i 1 1 J 01/2008 1 01350-7of6 1 CITY OF PEARLAND CONSTRUCTION PHOTOGRAPHS 7 Section 01380 CONSTRUCTION PHOTOGRAPHS 1.0 GENERAL 1.01 SECTION INCLUDES A Requirements for construction photographs and submittals. B References Technical Specifications: 1. Section 01100—Summary of Work 2. Section 01350—Submittals 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item, no separate payment will be made for Construction Photographs under this Section. Include cost in Bid Items for installed Work. 7 1.03 SUBMITTALS A When required by Section 01100 — Summary of Work, submit photographs in 1 accordance applicable provisions of this Section. B Make Submittals required by this and related Sections under the provisions of Section 01350—Submittals. C Prepare three(3)prints of each view and submit two (2) prints directly to the Project Manager within seven(7)days of taking photographs. One(1)print shall be retained by the Contractor in the field office at the Project Site and available at all times for reference. D When requested by the Project Manager, the Contractor shall submit extra prints of photographs, for distribution directly to designated parties who will pay the costs for the extra prints directly to the photographer. E When required by individual Sections, submit photographs taken prior to start of the ..� Work to show original Project Site conditions. F When required by Contract Documents, submit photographs with Application for Payment. G When required by individual Sections,submit photographs taken following completion of the Work to show the condition in which the Project Site will be left. 7 H With each submittal,include photographic negatives in protective envelopes,identified by Project Name, Contractor, and date photographs were taken. 01/2008 01380- 1 of 3 1 1 CITY OF PEARLAND CONSTRUCTION PHOTOGRAPHS 1.04 QUALITY ASSURANCE SURANCE A Contractor shall be responsible for the timely execution of the photographs, their vantage point, direction of shot, and quality. 2.0 PRODUCTS 2.01 PHOTOGRAPHS A Photographs shall be digital quality and shall be submitted on a CD. B The photographs shall show on a non-elective chalkboard or white board,readable in the photograph: 1. Job number. 2. Date and time photographs were taken. 3. Location of the photograph, house number and street, along with the project number. C Indicate the condition of the following: 1. Esplanades and boulevards. 2. Yards (near side and far side of street). 3. House-walk and sidewalk. 4. Curb. 5. Area between walk and curb. 6. Particular features (yard lights, shrubs,fence, trees, etc.). 7. Date shall be on negative. 8. Provide notation of vantage point marked for location and direction of shot on a key plan of the Project Site. D Sufficient number of photographs shall be taken to show the existence or non- existence of cracked concrete and the condition of trees, shrubs and grass. • E Identify each photograph with an applied label or rubber stamp on the back with the following information: 1. Name of the Project. 2. Name and address of the photographer(if a professional photographer is used). 3. Name of the Contractor. 4. Date the photograph was taken. 5. Photographs to be in plastic pockets and bound in three-ring notebook for easy access and viewing. 3.0 EXECUTION 3.01 PRECONSTRUCTION PHOTOGRAPHS A Prior to the commencement of the Work, take photographs of the entire route of the Project Site. C01/2008 01380-2 of 3 7 1-1 CITY OF PEARLAND CONSTRUCTION PHOTOGRAPHS 7 3.02 POST-CONSTRUCTION PHOTOGRAPHS A Following the completion of the Work,take photographs from corresponding vantage points and direction of shots. 3.03 PROGESS PHOTOGRAPHS A Take photographs at intervals, coinciding with the cutoff date associated with each Application for Payment and submit on CD with monthly Application for Payment. B Select the vantage points for each shot each month to best show the status of construction and progress since the last photographs were taken. Take not less than 7 two (2) shots from the same vantage point creating a time-lapsed sequence. C Follow direction when given by the Project Manager in selecting vantage points. 7 END OF SECTION 7 1 I 1 1 I 7 7 01/2008 01380-3 of 3 7 CITY OF PEARLAND REFERENCED STANDARDS Section 01420 REFERENCED STANDARDS 1.0 GENERAL 1.01 SECTION INCLUDES A General quality assurance as related to Reference Standards and a list of references. `� B References to Technical Specifications: None J 1.02 QUALITY ASSURANCE A For Products or workmanship specified by association, trade, or Federal Standards comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes. B Conform to reference standard by date of issue current on the date as stated in Section 00700—General Conditions of Agreement. C Request clarification from Engineer before proceeding should specified reference standards conflict with Contract Documents. 1.03 SCHEDULE OF REFERENCES AASHTO American Association of State Highway and Transportation Officials 444 North Capitol Street,N.W. Washington,DC 20001 ACI American Concrete Institute P.O. Box 19150 Reford Station Detroit, MI 48219-0150 AGC Associated General Contractors of America 1957 E Street, N.W. Washington,DC 20006 AI Asphalt Institute Asphalt Institute Building College Park,MD 20740 AITC American Institute of Timber Construction 333 W. Hampden Avenue Englewood, CO 80110 02/2008 01420- 1 of 5 CITY OF PEARLAND REFERENCED STANDARDS AISC American.Institute of Steel Construction 400 North Michigan Avenue,Eighth Floor Chicago, IL 60611 AISI American Iron and Steel Institute 1000 16th Street,N.W. Washington,DC 20036 ASME American Societyof Mechanical Engineers 345 East 47th Street New York, NY 10017 ANSI American National Standards Institute 1430 Broadway New York, NY 10018 101 APA American Plywood Association Box 11700 Tacoma,WA 98411 API American Petroleum Institute 1220 L Street,N.W. Washington, DC 20005 AREA American Railway Engineering Association 50 F Street, N.W. Washington,DC 20001 ASTM American Society for Testing and Materials 1916 Race Street Philadelphia, PA 19103 AWPA American Wood-Preservers'Association 7735 Old Georgetown Road Bethesda,MD 20014 AWS American Welding Society P.O. Box 35104 Miami, FL 33135 AWWA American Water Works Association 6666 West Quincy Avenue Denver, CO 80235 02/2008 01420-2 of 5 1 CITY OF PEARLAND REFERENCED STANDARDS CLFMI Chain Link Fence Manufacturers Institute 1101 Connecticut Avenue, N.W. Washington,DC 20036 CRD U.S.A. Corps of Engineers Code of Ordinances City of Pearland 3519 Liberty Drive Pearland, TX 77581 CRSI Concrete Reinforcing Steel Institute 933 Plum Grove Road Schaumburg, IL 60173-4758 EJMA Expansion Joint Manufacturers Association 707 Westchester Avenue White Plains,NY 10604 FDA U.S. Food and Drug Administration 1 5600 Fisher Lane Rockville, MD 20857-0001 FS Federal Standardization Documents General Services Administration, Specifications Unit(WFSIS) 7th and D Street S.W. Washington,DC 20406 ICEA Insulated Cable Engineer Association 1 P.O. Box 440 S. Yarmouth,MA 02664 IEEE Institute of Electrical and Electronics Engineers 445 Hoes Lane P.O. Box 1331 1 Piscataway,NJ 0855-1331 MIL Military Specifications General Services Administration, Specifications Unit(WFSIS) 7th and D Street S.W. Washington,DC 20406 �f NACE National Association of Corrosion Engineers P. O. Box 986 Katy, TX 77450 02/2008 01420-3 of 5 1 r CITY OF PEARLAND REFERENCED STANDARDS NEMA National Electrical Manufacturers' rers Association 2101 L Street,N.W., Suite 300 Washington,DC 20037 NFPA National Fire Protection Association Batterymarch Park,P.O.Box 9101 Quincy,MA 02269-9101 OSHA Occupational Safety Health Administration U.S. Department of Labor, Government Printing Office Washington,DC 20402 PCA Portland Cement Association 5420 Old Orchard Road Skokie, IL 60077-1083 PCI Prestressed Concrete Institute 201 North Wacker Drive Chicago, IL 60606 SDI Steel Deck Institute Box 9506 Canton, OH 44711 SSPC Steel Structures Painting Council 4400 Fifth Avenue Pittsburgh,PA 15213 TAC Texas Administrative Code TCEQ Texas Commission on Environmental Quality P. O. Box 13087 Austin, TX 78711-3087 TxDOT Texas Department of Transportation 125 East 11th Street Austin, TX 78701-2483 Texas MUTCD Texas Manual on Uniform Traffic Control Devices (2003 Adoption) (published by Texas Department of Transportation) UL Underwriters'Laboratories, Inc. 333 Pfingston Road Northbrook, IL 60062 UNI-BELL UNI-BELL Pipe Association 2655 Villa Creek Drive, Suite 155 02/2008 01420-4 of 5 7 I CITY OF PEARLAND REFERENCED STANDARDS 7 Dallas, TX 75234 WRI Wire Reinforcement Institute 7 942 Main Street—Suite 300 Hartford, CT 06103 7 i WWD/PI Water Well Drillers and Pump Installers Advisory Council Texas Department of Licensing and Regulation P.O. Box 121577 Austin, TX 78711 2.0 PRODUCTS - NotUsed 1 1 3.0 EXECUTION - NotUsed 7 END OF SECTION i 1 7 1 1 7J 7 1 7 1 1 1 1 02/2008 01420-5 of 5 1 I I CITY OF PEARLAND CONTRACTOR'S QUALITY CONTROL ^� Section 01430 CONTRACTOR'S QUALITY CONTROL 1.0 GENERAL ..� 1.01 SECTION INCLUDES A Quality assurance and control of installation and manufacturer's field services and reports. B References to Technical Specifications: 1. Section 01350—Submittals 1.02 SUBMITTALS 7 A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 7 1.03 QUALITY ASSURANCE/CONTROL OF INSTALLATION A Monitor quality control over suppliers, manufacturers, products, services, site 7 conditions, and workmanship, to produce the Work of specified quality at no additional cost to the Owner. B Comply fully with manufacturers' installation instructions, including each step in sequence. C Request clarification from Project Manager before proceeding should manufacturers' instructions conflict with Contract Documents. D Comply with specified Standards as minimum requirements for the Work except when more stringent tolerances,codes,or specified requirements indicate higher standards or more precise workmanship. E Perform work by persons qualified to produce the specified level of workmanship. F Obtain copies of Standards and maintain at Project Site when required by individual 1 Technical Specifications. 1.04 MANUFACTURERS' FIELD SERVICES AND REPORTS A When specified in individual Technical Specifications, provide material or product suppliers' or manufacturers' technical representative to observe site conditions, conditions of surfaces and installation,quality of workmanship,start-up of equipment, operator training, test, adjust, and balance of equipment as applicable, and to initiate operation,as required. Conform to minimum time requirements for start-up operations '!i and operator training if defined in Technical Specifications. 02/2008 01430- 1 of 2 CITY OF PEARLAND CONTRACTOR'S QUALITY CONTROL B At the Project Manager's request, submit qualifications of manufacturer's representative to Project Manager fifteen (15) days in advance of required C representative's services. The representative shall be subject to approval of Project Manager. C Manufacturer's representative shall report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers'written instructions. Submit report within one(1)day of observation to Project Manager for review. 2.0 PRODUCTS - NotUsed 3.0 EXECUTION - NotUsed END OF SECTION [111 02/2008 01430-2 of 2 r CITY OF PEARLAND OBSERVATION SERVICES Section 01440 OBSERVATION SERVICES 1.0 GENERAL 1.01 SECTION INCLUDES A Observation services and references. B References to Technical Specifications: 1. Section 01450—Testing Laboratory Services 1.02 INSPECTION A Project Manager will appoint an Observer as a representative of the Owner to oversee inspections,tests,and other services specified in individual Technical Specifications. B Alternately, Project Manager may appoint, employ, and pay an independent firm to provide additional observation or construction management services as indicated in Section 01450—Testing Laboratory Services. C Reports will be submitted by the independent firm to Project Manager,Engineer,and Contractor,indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents. D Contractor shall assist and cooperate with the Observer;furnish samples of materials, design mix, equipment, tools, and storage. E Contractor shall notify Project Manager 24 hours prior to expected time for operations requiring services. Notify Engineer and independent firm when noted. [17 F Contractor shall sign and acknowledge report for Observer. p 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION L_ 09/2007 01440- 1 of 1 CITY OF PEARLAND TESTING LABORATORY SERVICES Section 01450 TESTING LABORATORY SERVICES 1.0 GENERAL 1.01 SECTION INCLUDES A Testing Laboratory Services and Contractor responsibilities related to those services. B References to Technical Specifications: 1. Section 01350—Submittals C Referenced Standards: C1. American Society for Testing and Materials (ASTM)a. ASTM D 3740, "Practice for Evaluation of Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction" b. ASTM E 329, "Recommended Practice for Inspection and Testing Agencies for Concrete, Steel, and Bituminous Materials as Used in Construction" 1.02 SELECTION AND PAYMENT A Owner will select,employ,and pay for services of an independent testing laboratory to perform inspection and testing identified in individual Technical Specifications. B Employment of testing laboratory shall not relieve Contractor of obligation to perform C work in accordance with requirements of Contract Documents. C Owner or designated representative shall schedule and monitor testing as required to provide timely results and to avoid delay to the Work. D Contractor shall be responsible for paying for services of commercial testing laboratory, with prior approval of Owner, to perform the following: 1. Pipe diameter deflection tests on all flexible and semi-rigid sanitary sewer collection system pipe installation 2. Laboratory services required to establish mix design proposed for use for Portland cement concrete, asphaltic concrete mixtures and other material mixes requiring control by testing laboratory when required because of change in source of materials or other conditions not caused by Owner. 3. Tests required to establish optimum moisture of earth and base materials and to determine required compactive effort to meet density requirements. 4. Cores to test for thickness. 5. Testing and inspection performed for the Contractor's convenience. 6. Retesting and repetitions of laboratory services when initial tests indicate Cwork does not comply with requirements of Contract Documents. 04/2008 01450-1 of 3 CITY OF PEARLAND TESTING LABORATORY SERVICES �+ 1.03 LABORATORY REPORTS A The Engineer will receive 1 copy, the Project Manager will receive 2 copies, and the ,� Contractor will receive 2 copies of Laboratory Reports from the testing laboratory. One of the Contractor's copies shall remain at the Project Site for duration of Project. Test results which indicate non-conformance shall be transmitted immediately via fax from the testing laboratory to the Contractor and Project Manager. 1.04 LIMITS ON TESTING LABORATORY AUTHORITY A Laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents. B Laboratory may not approve or accept any portion of the Work. C Laboratory may not assume any duties of Contractor. D Laboratory has no authority to stop the Work. 1.05 CONTRACTOR RESPONSIBILITIES A Notify Project Manager and laboratory 24 hours prior to expected time for operations requiring inspection and testing services. Notify Engineer if specification section requires the presence of the Engineer. B Cooperate with laboratory personnel in collecting samples to be tested or collected on Project Site. C Provide access to the Work and to manufacturer's facilities. D Provide samples to laboratory in advance of their intended use to allow thorough examination and testing. E Provide incidental labor and facilities for access to the Work to be tested;to obtain and handle samples at the site or at source of products to be tested; and to facilitate tests and inspections including storage and curing of test samples. F Arrange with laboratory and pay for: 1. Retesting required for failed tests. 2. Retesting for nonconforming Work. 3. Additional sampling and tests requested by Contractor for his own purposes. ^� 2.0 PRODUCTS - Not Used 3.0 EXECUTION 04/2008 01450-2 of 3 1 CITY OF PEARLAND TESTING LABORATORY SERVICES 3.01 CO NDUCTING TESTING A Laboratory sampling and testing shall conform to ASTM D 3740 and ASTM E 329,as well as other test standards specified in individual Technical Specifications. END OF SECTION E 04/2008 01450-3 of 3 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS Section 01500 TEMPORARY FACILITIES AND CONTROLS 1.0 GENERAL 1.01 SECTION INCLUDES A Temporary facilities and the necessary controls for the Work including utilities, telephone, sanitary facilities, field office, storage sheds and building, safety requirements,first aid equipment,fire protection,security measures,protection of the Work and property, access roads and parking, environmental controls, disposal of trash,debris,and excavated material,pest and rodent control,water runoff and erosion control. B References to Technical Specifications: Section 01350—Submittals Section 01566—Source Controls for Erosion&Sedimentation Section 01100—Summary of Work Section 01600—Material &Equipment Section 01570—Trench Safety System Section 01555—Traffic Control&Regulation Section 01720—Field Surveying Section 01563—Tree&Plant Protection Section 01564—Control of Ground Water&Surface Water C Referenced Standards: Occupational Safety and Health Administration(OSHA) National Fire Protection Association (NFPA) Code of Ordinances, City of Pearland, Texas L�. D Definitions: Underground Structures - sewer, water, gas, and other piping, and manholes, chambers, electrical and signal conduits, tunnels, and other existing subsurface installations located within or adjacent to the limits of the Work. Surface Structures -existing buildings, structures and other constructed installations above the ground surface. Included with such structures are their foundations or any extension below the surface. Surface structures include, but are not limited to buildings, tanks, walls,bridges,roads, dams,channels, open drainage,piping,poles, wires, posts, signs, markers, curbs, walks, guard cables, fencing, and other facilities that are visible above the ground surface. 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 02/2008 01500- 1 of 9 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS ^1 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1.04 CONTRACTOR'S RESPONSIBILITY A The facilities and controls specified in this Section are considered minimum for the Work. The Contractor may provide additional facilities and controls for the proper execution of the Work and to meet Contractor's responsibilities for protection of persons and property. �{ B Comply with applicable requirements specified in other Technical Specifications. ! Maintain and operate temporary facilities and systems to assure continuous service. Modify and extend systems as Work progress requires. fl Completely remove temporary materials and equipment when their use is no longer _ I required. Restore existing facilities used for temporary services to specified or to original 1 condition. 1.05 TEMPORARY UTILITIES A Temporary Service Make arrangements with utility service companies for temporary services. Abide by rules and regulations of the utility service companies or authorities having 1 jurisdiction. Be responsible for utility service costs until the Work is Substantially Complete. Included are fuel,power,light,heat,and other utility services necessary for execution, completion, testing, and initial operation of the Work. B Water Provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices, or for other use as required for proper completion of the Work. For water to be drawn from public fire hydrants, obtain special permit or license and meter from the proper City officials. A deposit based on rates established by latest ordinance will be required. Install backflow preventor on fire hydrant supply. Provide and maintain an adequate supply of potable water for domestic consumption by Contractor personnel. C Electricity and Lighting Provide electric power service as required for the Work, including testing of Work. Provide power for lighting, operation of the Contractor's equipment, or for any other use by Contractor. 1 Electric power service includes temporary power service or generator to maintain plant operations during any scheduled shutdown. 7 Minimum lighting level shall be 5 foot-candles for open areas; 10 foot-candles for stairs and shops. 02/2008 1 01500-2of9 C r CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS D Temporary Heat and Ventila tion Y Provide temporary heat as necessary for protection or completion of the Work. Provide temporary heat and ventilation to assure safe working conditions; maintain enclosed areas at a minimum of 50 degrees F. Telephone Provide emergency telephone service at the Project Site for use by Contractor personnel and others performing work or furnishing services. F Sanitary Facilities Provide and maintain sanitary facilities for persons on the Project Site,in compliance with federal, state, and local regulations. Locate toilets on the Project Site near the work and secluded from view insofar as possible. Keep toilets clean and supplied throughout the course of the Work. Pp Enforce the use of sanitary facilities by construction personnel at the Project Site. Such facilities shall be enclosed. Pit-type toilets will not be permitted. No discharge will be allowed from these facilities. Collect and store sewage and waste so as not to cause a nuisance or health problem; have sewage and waste hauled off-site and properly disposed in accordance with local regulations. Control areas where sanitary facilities are located in conformance with Section 01566 —Source Controls for Erosion&Sedimentation. 1.06 FIELD OFFICE A. Provision of a Field Office is required unless otherwise stated in Section 01100 - Summary of Work. The Contractor shall confirm location of office and other temporary facilities with Owner's Representative at Pre-Construction Meeting prior to delivery and set up. B. At a minimum the Contractor's field office shall provide for, contain or serve to: provide a d project operations, c rmeetings,on-sitesecure storagespace forfor project files andadministrative plans,office space for CONTRACTORperiodiprogress'S field supervisory personnel and provide a separate securable office space for OWNER's Representative including: meeting table and chairs, a single two drawer filing cabinet, a built-in drawing table and plan holders. Provide electric lighting and HVAC to the mobile office. Provide for transportation,move-in,set-up,tie-down and, when project is complete,removal and move-out. 1.07 STORAGE OF MATERIALS A Provide for storage of materials under the provisions of Section 01600—Material& Equipment. 1.08 SAFETY REQUIREMENTS A Contractor shall prepare, submit and follow a Safety Program that complies with federal, state, and local safety codes, statutes, and practices. Include in the Safety Program documented response to excavation, embankment, and trench safety requirements as specified in Section 01570—Trench Safety System. 02/2008 01500-3 of 9 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS B Conduct operations in strict accord with applicable federal,state and local safety codes and statutes and with good construction practice. The Contractor is fully responsible and obligated to establish and maintain procedures for safety of all work,personnel and equipment involved in the Work. C Observe and comply with Texas Occupational Safety Act (Art. 5182a, V.C.S.) and with all safety and health standards promulgated by Secretary of Labor under Section 107 of Contract Work Hours and Standards Act, published in OSHA Standards -29 CFR, Part 1926, and adopted by Secretary of Labor under the Williams-Steiger Occupational Safety and Health Act of 1970, and to any other legislation enacted for safety and health of Contractor employees. Such safety and health standards apply to subcontractors and their employees as well as to the Contractor and its,employees. 1 D Observance of and compliance with the regulations shall be solely and without qualification the responsibility of the Contractor without reliance or superintendence of or direction by the Engineer or the Engineer's representative. Immediately advise the Engineer of investigation or inspection by Federal Safety and Health inspectors of the Contractor or subcontractor's work or place of work on the Project Site under this Contract,and after such investigation or inspection,advise the Engineer of the results. Submit one copy of accident reports to Engineer within ten (10) days of occurrence. E Protect areas occupied by workmen using the best available devices for detection of lethal and combustible gases. Test such devices frequently to assure their functional capability. Constantly observe infiltration of liquids into the Work area for visual or odor evidence of contamination. Take immediate and appropriate steps to seal off entry of contaminated liquids to the Work area. 7 F Safety measures, including but not limited to safety personnel, first-aid equipment, ventilating equipment and safety equipment,in the Plans and Technical Specifications are obligations of the Contractor. G Maintain required coordination with the local Police and Fire Departments during the entire period covered by the Contract. fl 1.09 FIRST AID EQUIPMENT A Provide a first aid kit throughout the construction period. List telephone numbers for T physicians, hospitals, and ambulance services in each first aid kit. B Have at least one person thoroughly trained in first aid procedures present on the T Project Site whenever work is in progress. 1.10 FIRE PROTECTION A Fire Protection Standards. Conform to specified fire protection and prevention requirements as well as those that fl may be established by Federal, State, or local governmental agencies. 1 C omply with all applicable provisions of NFPA Standard No. 241, Safeguarding Building Construction and Demolition Operations. 'l l 02/2008 01500-4 of 9 1 E CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS Provide portable fire extinguishers, rated not less tha n an 2A or 5B in accordance with NFPA Standard No. 10,Portable Fire Extinguishers,for each temporary building,and for every 3000 square feet of floor area of facilities under construction. Locate portable fire extinguishers within 50 feet maximum from any point on the Project Site. B Fire Prevention and Safety Measures. Prohibit smoking in hazardous areas. Post suitable warning signs in areas that are continuously or intermittently hazardous. Use metal safety containers for storage and handling of flammable and combustible liquids. Do not store flammable or combustible liquids in or near stairways or exits. Maintain clear exits from all points within a structure. 1.11 SECURITY MEASURES A Protect all materials, equipment, and property associated with the Work from loss, theft,damage,and vandalism. Contractor's duty to protect property includes Owner's property. B If existing fencing or barriers are breached or removed for purposes of construction, provide and maintain temporary security fencing equal to existing. 1.12 PROTECTION OF PUBLIC UTILITIES A Prevent damage to existing public utilities duringconstruction. These utilities are shown on the Plans at their approximate locations. Give owners of these utilities at least 48 hours notice before commencing Work in the area, for locating the utilities during construction,and for making adjustments or relocation of the utilities when they conflict with the proposed Work. 1.13 PROTECTION OF PEOPLE AND PROPERTY A Preventive Actions. LTake precautions, provide programs, and take actions necessary to protect the Work and public and private property from damage. Take action to prevent damage, injury or loss, including, but not limited to, the following: a. Store apparatus,materials,supplies,and equipment in an orderly,safe manner that will not unduly interfere with progress of the Work or the Work of any other contractor, any utility service company, or the Owner's operations. b. Provide suitable storage for materials that are subject to damage by 7. exposure to weather, theft, breakage, or otherwise. c. Place upon the Work or any part thereof only such loads as are consistent with the safety of that portion of the Work. d. Frequently clean up refuse,rubbish,scrap materials,and debris caused by construction operations, keeping the Work safe and orderly. 02/2008 01500-5 of 9 7 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS 7 e. Provide safe barricades and guard rails around openings, for scaffolding, for temporary stairs and ramps, arbund excavations, elevated walkways, and other hazardous areas. Obtain written consent from proper parties before entering or occupying with workers, tools,materials or equipment,privately owned land except on easements provided for construction. Assume full responsibility for the preservation of public and private property on or adjacent to the site. If any direct or indirect damage is done by or on account of any act, omission, neglect, or misconduct in execution of the Work by the Contractor, it shall be restored by the Contractor to a condition equal to or better than that existing before the damage was done. B Barricades and Warning Signals. Where Work is performed on or adjacent to any roadway, right-of-way, or public place, furnish and erect barricades, fences, lights, warning signs, and danger signals; 71 provide watchmen;and take other precautionary measures for the protection of persons or property and protection of the Work.Conform to Section 01555—Traffic Control& Regulation. C Preserving Control Points Maintain permanent benchmarks,monumentation,and other reference points. Unless otherwise directed in writing,replace at no cost to the Owner those that are damaged or destroyed in accordance with Section 01720—Field Surveying. D Tree and Plant Protection. Protect trees,shrubs,lawns,outside of grading limits and within the grading limits as designated on the Plans,and in accordance with requirements of Section 01563—Tree &Plant Protection. E Protection of Underground and Surface Structures Known underground structures, including water, sewer, electric, and telephone services are shown on the Plans in accordance with the best information available,but is not guaranteed to be correct or complete. Contractor is responsible for making Locate Calls. Explore ahead of trenching and excavation work and uncover obstructing underground structures sufficiently to determine their location, to prevent damage to them and to prevent interruption of utility services. Restore to original condition damages to underground structure at no additional cost to the Owner. Immediately notify the agency or company owning any existing utility which is damaged,broken,or disturbed. Obtain approval from the Engineer and agency for any repairs or relocations, either temporary or permanent. Necessary changes in location of the Work may be made by the Engineer to avoid unanticipated underground structures. If permanent relocation of an underground structure or other subsurface installations is required and not otherwise provided for in the Contract Documents,the Engineer will direct Contractor in writing to perform the Work, which shall be paid for under the provisions for changes in the Contract Price as described in Section 00700—General Conditions of Agreement. 02/2008 01500-6 of 9 1 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS Support in place and pr otect from direct or indirect injury to underground and surface structures located within or adjacent to the limits of the Work. Install such supports carefully and as required by the party owning or controlling such structure. Before installing structure supports,Contractor shall satisfy the Engineer that the methods and procedures to be used have been approved by the owner of the structure. Avoid moving or in any way changing the property of public utilities or private service corporations without prior written consent of a responsible official of that service or public utility. Representatives of these utilities reserve the right to enter within the limits of this project for the purpose of maintaining their properties,or of making such changes or repairs to their property that may be considered necessary by performance of this Contract. Notify the owners and/or operators of utilities and pipelines of the nature of construction operations to be performed and the date or dates on which those operations will be performed. When construction operations are required in the immediate vicinity of existing structures,pipelines,or utilities,give a minimum of five (5)working days advance notice. Probe and flag the location of underground utilities prior to commencement of excavation. Keep flags in place until construction operations reach and uncover the utility. Assume risks attending the presence or proximity of underground and surface structures within or adjacent to the limits to the Work including but not limited to damage and expense for direct or indirect injury caused by the Work to any structure. Immediately repair damage caused, to the satisfaction of the owner of the damaged structure. 1.14 PROTECTION OF THE WORK Provide protection of installed products to prevent damage from subsequent operations. Remove protection facilities when no longer needed,prior to completion of the Work. Control traffic to prevent damage to equipment,materials, and surfaces. 1.15 ROADS AND PARKING A Prevent interference with traffic and Owner operations on existing roads. B Minimize use of existing streets and driveways by construction traffic. C Control traffic to prevent damage to equipment, materials, and surfaces. D Construct and maintain temporary detours, ramps, and roads to provide for normal public traffic flow when use of public roads or streets is closed by necessities of the Work. E Provide mats or other means to prevent overloading or damage to existing roadways from tracked equipment or exceptionally large or heavy trucks or equipment F Designate temporary parking areas to accommodate construction personnel. When site space is not adequate, provide additional off-site parking. Locate as approved by L Engineer. 02/2008 01500-7 of 9 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS '7 G Do not allow heavy vehicles or construction equipment unnecessarily in existing parking areas. fl 1.16 ENVIRONMENTAL CONTROLS A Provide and maintain methods, equipment, and temporary construction as necessary for controls over environmental conditions at the construction site and adjacent areas. B Comply with statutes,regulations,and ordinances which relate to the proposed Work for the prevention of environmental pollution and preservation of natural resources, including but not limited to the National Environmental Policy Act of 1969,PL 91- Ion 190, Executive Order 11514. 1. Provide, install and maintain storm water runoff control including but not 9-1 limited to temporary entrance, silt fencing, etc. as specified in Contract Documents. C Recognize and adhere to the environmental requirements of the Project. Disturbed areas shall be strictly limited to boundaries established by the Contract Documents. Burning of rubbish, debris or waste materials is not permitted. 1.17 POLLUTION CONTROL A Provide methods,means,and facilities required to prevent contamination of soil,water —1or atmosphere by discharge of noxious substances from construction operations. B Provide equipment and personnel to perform emergency measures required to contain any spillage,and to remove contaminated soils or liquids. Excavate and dispose of any contaminated earth off-site, and replace with suitable compacted fill and topsoil. C Take special measures to prevent harmful substances from entering receiving streams 7 or storm water conveyance systems in conformance with TPDES requirements and Section 01566—Source Controls for Erosion &Sedimentation. D Provide systems for control of atmospheric pollutants. 71 Prevent toxic concentrations of chemicals. Prevent harmful dispersal of pollutants into the atmosphere. E Use equipment during construction that conforms to current federal, state, and local laws and regulations. fl 1.18 PEST AND RODENT CONTROL A Provide rodent and pest control as necessary to prevent infestation of Project Site. �I B Employ methods and use materials which will not adversely affect conditions at the Project Site or adjoining properties. 02/2008 + 01500-8of9 1 CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS 1.19 NOISE CONTROL A Provide vehicles, equipment, and construction activities that minimize noise to the greatest degree practicable. Noise levels shall conform to OSHA Standards- 29 CFR and in no case will noise levels be permitted which create a nuisance in the surrounding neighborhoods. LI B Conduct construction operations during daylight hours from 7:30 a.m. to 6:00 p.m. except as approved by Engineer. C Comply with Chapter 19 NOISE, Codes of Ordinances, City of Pearland, Texas. 1.20 DUST CONTROL A Control objectionable dust caused by operation of vehicles and equipment under the provisions of Section 01566—Source Controls for Erosion&Sedimentation. 1.21 WATER RUNOFF AND EROSION CONTROL A Provide methods to control surface water,runoff,subsurface water,and n water pumped from excavations and structures to prevent damage to the Work, the Project Site, or adjoining properties in accordance with Section 01564—Control of Ground Water& Surface Water and Section 01566—Source Controls for Erosion&Sedimentation. {� B Inspect earthwork periodically to detect any evidence of the start of erosion. Apply �f corrective measures as required to control erosion. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 7 02/2008 01500-9 of 9 r4 CITY OF PEARLAND MOBILIZATION Section 01505 MOBILIZATION 1.0 GENERAL 1.01 SECTION INCLUDES A Mobilization of construction equipment and facilities onto the Work. B Referenced Standards: 1. Texas Department of Transportation (TxDOT) 2. Texas Manual on Uniform Traffic Control Devices (Texas MUTCD) 1.02 MEASUREMENT AND PAYMENT A Measurement for Mobilization is on a LumpSum basis. Include 50 percent of the cost of Mobilization in the first monthly Application for Payment. B Payment is subject to the receipt and approval by Engineer of the following items, as applicable: 1. Schedule of Values (Section 01350—Submittals) 2. Trench Safety Program (Section 01570—Trench Safety System) 3. Construction Schedule (Section 01350—Submittals) 4. Pre-construction Photographs (Section 01380—Construction Photographs) 5. Installation and acceptance of Project Identification Sign(s) 6. Installation and acceptance of Field Office as defined in Section 01500, 1.06. C Payment of the remaining 50 percent of the Contract Price for Mobilization is subject to completion of Temporary Facilities as specified in Section 01500, inclusive. D Mobilization payments will be subject to Retainage as stipulated in Section 00700 - General Conditions of Agreement. 2.0 PRODUCTS 2.01 PROJECT IDENTIFICATION SIGNS A Provide specified number of project identification sign(s) per Section 01580 The name,address and contact information of the general contractor for the project shall be shown on the sign per Section 01580 and the attached exhibit. 3.0 EXECUTION 3.01 PLACEMENT OF PROJECT IDENTIFICATION SIGNS A Place a Project Identification Sign as described in Section 01580,part 1.03,D visible to passing traffic or as directed by Engineer. END OF SECTION 07/2006 01505- 1 of 1 E CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS C Section 01550 STABILIZED CONSTRUCTION EXITS 1.0 GENERAL 1.01 SECTION INCLUDES A Installation of erosion and sediment control for Stabilized Construction Exits used during construction and until final development of the Project site. B References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01562—Waste Material Disposal 3. Section 01566—Source Controls for Erosion &Sedimentation C C Referenced Standards: 1. American Society of Testing and Materials (ASTM) a. ASTM D 4632, "Standard Test Method for Grab Breaking Load and Elongation of Geotextiles" 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required in this Section under the provisions of Section 01350 — Submittals. B Manufacturer's catalog sheets and other product data on Geotextile fabric. C Sieve analysis of aggregates conforming to requirements in this Section,2.02"Course Aggregates". 2.0 PRODUCTS 2.01 GEOTEXTILE FABRIC A Provide woven or non-woven geotextile fabric made of either polypropylene, polyethylene, ethylene, or polyamide material. B By ASTM D 4632,geotextile fabric shall have a minimum grab strength of 270 psi any principal direction, and the equivalent opening size between 50 and 140. C Both the geotextile and threads shall be resistant to chemical attack,mildew, and rot and shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable life at a temperature range of 0°F to 120°F. 02/2008 01550- 1 of 4 CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS D Representative Manufactu rers: Mirafi, Inc., Or-Equal. 2.02 COARSE AGGREGATES A Coarse aggregate shall consist of crushed stone,gravel,concrete,crushed blast furnace slag,or a combination of these materials. Aggregate shall be composed of clean,hard, durable materials free from adherent coatings,salt,alkali,dirt,clay,loam,shale,soft or flaky materials, or organic and injurious matter. B Course aggregates shall conform to the following gradation requirements. Sieve Size Percent Retained (Square Mesh) (by Weight) 21/2" 0 2" 0-20 11/2" 15-50 3�" 60-80 No. 4 95 - 100 3.0 EXECUTION 3.01 PREPARATION AND INSTALLATI ON A If necessary to keep the street clean of mud carried by construction vehicles and equipment, Contractor shall provide stabilized construction exits at the construction, staging,parking,storage,and disposal areas. Such erosion and sediment controls shall be constructed in accordance with the requirements shown on the Plans and specified in this Section. B Erosion and sediment control measures shall be in place prior to the start of any Work that exposes the soil, other than as specifically directed by the Engineer to allow soil testing and surveying. C Maintain existing erosion and sediment control systems located within the Project Site until acceptance of the Work or until directed by the Engineer to remove and discard the existing system. D Regularly inspect and repair or replace components of stabilized construction exits. Unless otherwise directed, maintain them until the Work is accepted by the Owner. Remove stabilized construction exits promptly when directed by the Engineer. Discard removed materials in accordance with Section 01562—Waste Material Disposal. E Equipment and vehicles shall be prohibited by the Contractor from maneuvering on areas outside of dedicated rights-of-way and easements for construction. Damage caused by construction traffic to erosion and sediment control systems shall be repaired immediately. 02/2008 01550-2of4 "'I CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS F Conduct all const ruction operations under this Contract in conformance with the �.q erosion control practices described in the Section 01566-Source Controls for Erosion &Sedimentation. 3.02 CONSTRUCTION METHODS A Provide stabilized access roads, subdivision roads, parking areas, and other on-site vehicle transportation routes where shown on Plans. B Provide stabilized construction exits, and truck washing areas when approved by Engineer, of the sizes and locations where shown on Plans or as specified in this Section. C Vehicles leaving construction areas shall have their tires cleaned to remove sediment prior to entrance onto public right-of-way. When washing is needed to remove sediment, Contractor shall construct a truck washing area. Truck washing shall be done on stabilized areas which drain into a drainage system protected by erosion and sediment control measures. D Details for Stabilized Cons truction Exits are shown on the Plans. Construction of all other stabilized areas shall be to the same requirements. Roadway width shall be at least 14 feet for one-way traffic and 20 feet for two-way traffic and shall be sufficient for all ingress and egress. Furnish and place geotextile fabric as a permeable separator prevent mxing f cre underlaying soil. Exposur geotexti fabrictopreve to the elementsi o betweenoa se aggr laydowngatewith and cover sh be a maximume ofof 14 days tole all minimize damage potential. E . Roads and parking areas shall be graded to provide sufficient drainage away from stabilized areas. Use sandbags,gravel,boards,or similar methods to prevent sediment from entering public right-of-way,receiving stream or storm water conveyance system. F The stabilized areas shall be inspected and maintained daily. Provide periodic top dressing with additional coarse aggregates to maintain the required depth. Repair and clean out damaged control measures used to trap sediment. All sediment spilled, dropped,washed, or tracked onto public right-of-way shall be removed immediately. G The length of the stabilized area shall be as shown on the Plans,but not less than 50 feet. The thickness shall not be less than 8 inches. The width shall not be less than full width of all points of ingress or egress. H Stabilization for other areas shall have the same coarse aggregate,thickness,and width requirements as the stabilized construction exit,except where shown otherwise on the Plans. I Stabilized area may be widened or lengthened to accommodate truck g washing area when authorized by Engineer. 02/2008 01550 3 of 4 CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS J Alternative methods of construction may be utilized when shown on Plans, or when approved by the Engineer. These methods include the following: 1. Cement-Stabilized Soil, Compacted cement-stabilized soil or other fill material in an application thickness of at least 8 inches. 2. Wood Mats/Mud Mats - Oak or other hardwood timbers placed edge-to- edge and across support wooden beams which are placed on top of existing soil in an application thickness of at least 6 inches. 3. Steel Mats -Perforated mats placed across perpendicular support members. END OF SEC TION 1 1 1 1 1 02/2008 01550-4of4 1 1 CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION Section 01555 TRAFFIC CONTROL AND REGULATION 1.0 GENERAL 7 1.01 SECTION INCLUDES A Requirements for traffic control plans,signs,signals,control devices,flares,lights and traffic signals, as well as construction parking control, designated haul routes and bridging of trenches and excavations. B Requirements for and qualifications of Flaggers. C References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01140—Contractor's Use of Premises D Referenced Standards: 1. Texas Manual on Uniform Traffic Control Devices (Texas MUTCD) 1.02 MEASUREMENT AND PAYMENT 1 A Traffic Control and Regulation. Measurement is on a Lump Sum basis for Traffic Control and Regulation,including submittal of a traffic control plan if different from the one provided on the Plans, provision of traffic control devices, and provision of equipment and personnel as necessary to protect the Work and the public. The amount invoiced shall be determined based on the Schedule of Values submitted for traffic 1 control and regulation. B Flaggers. Measurement is on a Lump Sum basis for Flaggers as required for the Work. '� The amount invoiced shall be determined based on the Schedule of Values submitted J for Flaggers. 1.03 SUBMITTALS 1 A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B A Traffic Control Plan responsive to the Texas MUTCD and sealed by a Registered Professional Engineer is incorporated into the Plans. If the Contractor proposes to implement traffic control different than the plan provided, he shall submit a Traffic Control Plan in conformance with Texas MUTCD for approval of the Engineer. 7 C For both the Traffic Control Plan and Flaggers' use, submit Schedules of Values within 30 days following the Notice to Proceed. D Each week submit a daily log for Flaggers listing name,badge number,time start,time finish, and hours worked. 03/2008 01555- 1 of 4 CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION 1.04 FLAGGERS A Unless otherwise specified, use only Flaggers who are off-duty,regularly employed, uniformed Peace Officers. B Flaggers are required at the following locations: 1. Where multi-lane vehicular traffic must be diverted into single-lane vehicular traffic. r" 2. Where vehicular traffic must change lanes abruptly. 3. Where construction equipment either enters or crosses vehicular traffic lanes and walks. 4. Where construction equipment may intermittently encroach on vehicular traffic lanes and unprotected walks and cross-walks. 5. Where construction activities might affect public safety and convenience. 6. Where traffic regulation is needed due to rerouting of vehicular traffic around the work site. 7. When requested by Owner. C The use of Flaggers is for the purpose of assisting in the regulation of traffic flow and movement, and does not in any way relieve the contractor of full responsibility for taking such other steps and provide such other Flaggers or personnel as the Contractor may deem necessary to protect the work and the public, and does not in any way relieve the Contractor of his responsibility for any damage for which he would otherwise be liable. L Flaggers shall be used and maintained at such points for such periods of time as may be required to provide for the public safety and convenience of travel. 2.0 PRODUCTS 2.01 SIGNS,SIGNALS,AND DEVICES A Comply with Texas MUTCD regulations. B Traffic Cones and Drums, Flares and Lights: As approved by agencies having jurisdiction. 3.0 EXECUTION 3.01 PUBLIC ROADS A Abide by laws and regulations of governing authorities when using public roads. If the Contractor's work requires that public roads be temporarily impeded or closed, approvals shall be obtained from governing authorities and permits paid for before starting any work. Coordinate activities with the Engineer. Contractor shall maintain at all times a 10-foot-wide all-weather lane adjacent to work areas which shall be kept free of construction equipment and debris and shall be for the use of emergency vehicles, or as otherwise provided in the Traffic Control Plan. 03/2008 01555-2 of 4 CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION C Contractor shall not obstruct the normal flow of traffic from 7:00 a.m.to 9:00 a.m.and 4:00 p.m. to 6:00 p.m. on designated major arterials or as directed by the Engineer. D Contractor shall maintain local driveway access to residential and commercial properties adjacent to work areas at all times. E Cleanliness of Surrounding Streets: 1. Keep streets used for entering or leaving the job area free of excavated material, debris, and any foreign material resulting from construction operations. Leave the area broom-clean or its equivalent at the end of the work day. F Control vehicular parking to prevent interference with public traffic and parking,and access by emergency vehicles. G Monitor parking of construction personnel's vehicles in existing facilities. Maintain vehicular access to and through parking areas. H Prevent parking on or adjacent to access roads or in non-designated areas. 3.02 FLARES AND LIGHTS A Provide flares and lights during hours of low visibility to delineate traffic lanes and to guide traffic. 3.03 HAUL ROUTES A Utilize haul routes designated by Owner or shown on the Plans for construction traffic. B Confine construction traffic to designated haul routes. C Provide traffic control at critical areas of haul routes to regulate traffic and minimize interference with public traffic. D Contractor shall be responsible for any damage caused by vehicles utilizing haul routes. 3.04 TRAFFIC SIGNS AND SIGNALS 1 A Install traffic control devices at approaches to the site and on site, at crossroads, detours, parking areas, and elsewhere as needed to direct construction and affected public traffic. J B Relocate traffic signs and control devices as Work progresses to maintain effective 7 traffic control. 3.05 BRIDGING TRENCHES AND EXCAVATIONS A Whenever necessary,bridge trenches and excavation to permit an unobstructed flow of traffic. 03/2008 01555-3 of 4 CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION B Secure bridging against displacement by using adjustable cleats,angles,bolts or other devices whenever bridge is installed: 1. On an existing bus route; 2. When more than five percent of daily traffic is comprised of commercial or truck traffic; C 3. When more than two separate plates are used for the bridge; or 4. When bridge is to be used for more than five consecutive days. Install bridging to operate with minimum noise. D Adequately shore the trench or excavation to support bridge and traffic. E Extend steel plates used for bridging a minimum of one foot beyond edges of trench or excavation. Use temporary paving materials (premix) to feather edges of plates to minimize wheel impact on secured bridging. F Use steel plates of sufficient thickness to support H-20 loading, truck or lane, that produces maximum stress. 3.06 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. B Remove equipment and devices when no longer required. C Repair damage caused by installation. D Remove post settings to a depth of 2 feet. END OF SECTION r r 03/2008 01555-4 of 4 CITY OF PEARLAND FILTER FABRIC FENCE Section 01560 FILTER FABRIC FENCE 1.0 GENERAL 1.01 SECTION INCLUDES A Installation of filter fabric fence to control erosion and contain sediments and pollutants from overland flow. Filter fabric fence is not for use in channelized flow areas.Filter fabric fence may be reinforced. B References to Technical Specifications: 1. Section 01200—Measurement&Payment Procedures 2. Section 01350—Submittals 3. Section 01562—Waste Material Disposal 4. Section 01566—Source Controls for Erosion&Sedimentation C Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM D 3786,"Standard Test Method for Hydraulic Bursting strength of Textile Fabrics" b. ASTM D 4632, "Standard Test Method for Grab Breaking Load and Elongation of Geotextiles" 1.02 MEASURMENT AND PAYMENT A Filter fabric fence will be measured by the linear foot between the limits of the beginning and ending of wooden stakes. B Payment for filter fabric fence will include and be full compensation for all labor, equipment,materials,supervision,and all incidental expenses for construction of these items,complete in place,including,but not limited to protection of trees,maintenance requirements, repair and replacement of damaged sections, removal of sediment deposits, and removal of erosion and sediment control systems at the end of construction. C Refer to Section 01200—Measurement&Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Manufacturer's catalog sheets and other Product Data on geotextile fabric. 03/2008 01560- 1 of 3 r CITY OF PEARLAND FILTER FABRIC FENCE 2.0 PRODUCTS 2.01 FILTER FABRIC A Provide woven or nonwoven geotextile filter fabric made of either polypropylene, polyethylene, ethylene, or polyamide material. B By ASTM D 4632, geotextile fabric shall have a grab strength of 100 psi in any principal direction,a Mullen burst strength exceeding 200psi by ASTM-D3786,and the equivalent opening size between 50 and 140. C Filter fabric shall contain ultraviolet inhibitors and stabilizers to provide a minimum of fl 6 months of expected usable construction life at a temperature range of 0 degrees F to 120 degrees F. D Representative Manufacturer: Mirafi, Inc., or equal. 3.0 EXECUTION 3.01 PREPARATION AND INSTALLATION A Provide erosion and sediment control systems at the locations shown on Plans. Such systems shall be of the type indicated and shall be constructed in accordance with the requirements shown on the Plans and specified in this Section. B Erosion and sediment control measures shall be in place prior to the start of any Work that exposes the soil, other than as specifically directed by the Engineer to allow soil testing and surveying. C Regularly inspect and repair or replace damaged components of filter fabric fence as specified in this Section, 3.02F. Unless otherwise directed, maintain the erosion and sediment control systems until the Work is accepted by the Owner. Remove erosion and sediment control systems promptly when directed by the Engineer. Discard removed materials in accordance with Section 01562—Waste Material Disposal. D Conduct all construction operations under this Contract in conformance with the erosion control practices described in Section 01566—Source Controls for Erosion& Sedimentation. 3.02 CONSTRUCTION METHODS A Provide filter fabric fence systems in accordance with the Plan detail for Filter fabric fence. Filter fabric fence shall be installed in such a manner that surface runoff will percolate through the system in sheet flow fashion and allow sediment to be retained and accumulated. B Attach the filter fabric to 2-inch by 2-inch wooden stakes spaced a maximum of 3 feet apart and embedded a minimum of 8 inches. If filter fabric is factory preassembled 7 03/2008 01560-2 of 3 7 CITY OF PEARLAND FILTER FABRIC FENCE with support netting,the n g, e n maximum spacing allowable is 8 feet. Install wooden stakes at a slight angle toward the source of anticipated runoff. C Trench in the toe of the filter fabric fence with a spade p e or mechanical trencher as shown on the Plans. Lay filter fabric along the edges of the trench. Backfill and [r' compact trench. D Filter fabric fence shall have a minimum height of 18 inches and a maximum height of 36 inches above natural ground. E Provide the filter fabric in continuous rolls and cut to the length of the fence to minimize the use of joints. When joints are necessary,splice the Fabric together only at a support post with a minimum 6-inch overlap and seal securely. F Inspect filter fabric fence systems after each rainfall,daily during periods of prolonged rainfall, and at a minimum once each week. Repair or replace damaged sections immediately. Remove sediment deposits when silt reaches a depth one-third the height of the fence or 6 inches, whichever is less. END OF SECTION r 03/2008 01560-3 of 3 itr CITY OF PEARLAND REINFORCED FILTER FABRIC BARRIER Section 01561 REINFORCED FILTER FABRIC BARRIER 1.0 GENERAL 1.01 SECTION INCLUDES A Installation of reinforced filter fabric barrier to control erosion and contain sediments and pollutants in channelized flow areas. C B References to Technical Specifications: 1. Section 01200—Measurement&Payment Procedures 2. Section 01350—Submittals 3. Section 01566—Source Controls for Erosion &Sedimentation C Referenced Standards : 1. American Society for Testing and Materials (ASTM) a. ASTM D 3786,"Standard Test Method for Hydraulic Bursting strength of Textile Fabrics" b. ASTM D 4632, Standard Test Method for Grab Breaking Load and Elongation of Geotextiles" 1.02 MEASURMENT AND PAYMENT A Measurement for reinforced filter fabric barrier is on a linear foot basis between the limits of the beginning and ending fence posts, measured, accepted, and complete in place. B Payment for filter fabric barrier will include and be full compensation for all labor, equipment, materials, supervision, and incidental expenses for construction of these items,complete in place,including,but not limited to protection of trees,maintenance requirements, repair and replacement of damaged sections, removal of sediment deposits, and removal of erosion and sediment control systems at the end of construction.. C Refer to Section 01200—Measurement&Payment Procedures. 1.03 SUBMITTALS 7_ A Make Submittals required by this Section under the provisions of Section 01350— Submittals. B Manufacturer's catalog sheets and other product data on geotextile fabric. 7 05/2008 01561- 1 of 3 CITY OF PEARLAND REINFORCED FILTER FABRIC BARRIER ^l 2.0 PRODUCTS 2.01 FILTER FABRIC T A Provide woven or nonwoven geotextile filter fabric made of either polypropylene, polyethylene, ethylene, or polyamide material. B By ASTM - D4632, geotextile fabric shall have a grab strength of 100 psi in any principal direction, a Mullen burst strength exceeding 200psi by ASTM-D3786,and the equivalent opening size between 50 and 140. C Filter fabric shall contain ultraviolet inhibitors and stabilizers to provide a minimum of �I 6 months of expected usable construction life at a temperature range of 0 degrees F to 120 degrees F. D Representative Manufacturer: Mirafi, Inc., or equal. 2.02 FILTER FABRIC REINFORCEMENT A Provide woven galvanized steel wire fence with minimum thickness of 14 gauge and a maximum mesh spacing of 6 inches. B Welded wire shall be galvanized, 2-inch by 4-inch, welded wire fabric, 12 V2 gauge. 2.03 EXECUTION 7 2.04 PREPARATION A Provide erosion and sediment control systems at the locations shown on Plans. Such systems shall be of the type indicated and shall be constructed in accordance with the requirements shown on the Plans and specified in this Section. B Erosion and sediment control measures shall be in place prior to the start of any Work that exposes the soil, other than as specifically directed by the Engineer to allow soil testing and surveying. C Regularly inspect and repair or replace damaged components of filter fabric barrier. Unless otherwise directed,maintain the erosion and sediment control systems until the Work is accepted by the Owner. Remove erosion and sediment control systems promptly when directed by the Engineer. Discard removed materials in accordance with Section 1562—Waste Material Disposal. D Conduct all construction operations under this Contract in conformance with the erosion control practices described in Section 01566—Source Controls for Erosion& 7 Sedimentation. 05/2008 01561-2of3 CITY OF PEARLAND REINFORCED FILTER FABRIC BARRIER 2.05 INSTALLATION A Install reinforced filter fabric barriers for erosion and sediment control used during construction and until the final development of p the Project Site. Reinforced filter fabric barriers are used to retain sedimentation in channelized flow areas. B Provide reinforced filter fabric barrier in accordance with the Plan detail Reinforced Filter Fabric Barrier. Reinforced filter fabric barrier systems shall be installed in such a manner that runoff will percolate through the system and allow sediment to be retained and accumulated. C Trench in the toe of the reinforced filter fabric barrier with a spade or mechanical trencher as shown on the Plans. Lay filter fabric along the edges of the trench. Backfill and compact trench. D Reinforced filter fabric barrier shall have a height of 18 inches. E Securely fasten the filter fabric to the wire with tie wires. F Provide the filter fabric in continuous rolls and cut to the length of the fence to minimize the use of joints. When joints are necessary, splice the fabric together only at a support post with a minimum 6-inch overlap and seal securely. G Inspect the reinforced filter fabric barrier systems after each rainfall, daily during periods of prolonged rainfall, and at a minimum once each week. Repair or replace damaged sections immediately. Remove sediment deposits when silt reaches a depth one-third the height of the barrier or 6 inches, whichever is less. p END OF SECTION 05/2008 01561-3 of 3 ii CITY OF PEARLAND WASTE MATERIAL DISPOSAL Section 01562 WASTE MATERIAL DISPOSAL 1.0 GENERAL 1.01 SECTION INCLUDES rig A Disposal of waste material and salvageable material. B References to Technical Specifications: 7_ 1. Section 01350—Submittals 2. Section 01566—Source Controls for Erosion&Sedimentation 3. Section 01600—Materials &Equipment 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Obtain and submit applicable permits for proposed disposal sites. C Submit a Waste Material Disposal Plan. D Submit a copyof written ten permission from property owners,along with a description of the property,prior to disposal of excess material adjacent to the Project Site. Submit a written and signed release from property owner upon completion of disposal work. City of Pearland requires individual fill placement permits for all fill placed within the City limits. 1.04 WASTE MATERIAL DISPOSAL PLAN A Contractor shall formulate and implement a plan for the collection and disposal of waste materials on the Project Site which includes the following information: 1. Schedule for collection and inspection. 2. Location of trash and waste receptacles. 3. Provisions for liquid waste and potential water pollutants material. B The plan shall comply with applicable federal, state, and local health and safety regulations and Section 01566—Source Controls for Erosion &Sedimentation. 2.0 PRODUCTS - Not Used 07/2006 01562- 1 of 3 E CITY OF PEARLAND WASTE MATERIAL DISPOSAL 3.0 EXECUTION 3.01 SALVAGEABLE MATERIAL A Excavated material: When indicated on Plans, load, haul, and deposit excavated material at a location or locations outside the limits of Project Site. B Base, surface, and bedding material: Deliver gravel, asphaltic, or other base and surfacing material designated for salvage to the location designated by the Engineer. C Pipe culvert: Deliver culverts designated for salvage to Owner's storage area. D Other salvageable materials: Conform to requirements of individual Technical Specifications. E Coordinate delivery of salvageable material with Engineer. F When temporary, on-site storage of salvaged materials is required, comply with applicable provisions of Section 01600—Materials &Equipment. 3.02 SEDIMENT DISPOSAL A Remove sediment deposits and dispose of them at the designated spoil site for the Project. If a spoil site is not designated on the Plans, dispose of sediment off site at a location not in or adjacent to a stream or floodplain. B Off-site disposal is the responsibility of the Contractor. C Sediment to be placed at the Project Site should be spread evenly throughout the designated area,compacted and stabilized. Sediment shall not be allowed to flush into a stream or drainage way. D If sediment has been contaminated,it shall be disposed of in accordance with existing federal, state, and local rules and regulations. 3.03 EXCESS MATERIAL, WASTE,AND EQUIPMENT A Vegetation,rubble,broken concrete,debris, asphaltic concrete pavement,excess soil, and other materials not designated for salvage,shall become the property of Contractor and shall be removed from the Project Site and legally disposed of. 7 B Dispose of removed equipment,materials,waste and debris in a manner conforming to applicable laws and regulations C Excess soil may be deposited on private property adjacent to the Project Site when written permission is obtained from property owner under the provisions of this Section, 1.03D. 07/2006 1 01562-2of3 CITY OF PEARLAND WASTE MATERIAL DISPOSAL D Verify the flood plain status of any proposed disposal site. Do not dispose of excavated materials in an area designated as within the 100-year Flood Hazard Area. E Waste materials shall be removed from the site on a daily basis, such that the site is maintained in a neat and orderly condition. F No materials shall be disposed in a manner to damage the Owner in any way. END OF SECTION • E r 07/2006 01562-3 of 3 r a CITY OF PEARLAND TREE AND PLANT PROTECTION Section 01563 TREE AND PLANT PROTECTION 1.0 GENERAL 1.01 SECTION INCLUDES A Tree and plant protection. B References to Technical Specifications: None 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 PROJECT CONDITIONS A Preserve and protect existing trees and plants to remain from om foliage,branch,trunk,or root damage that could result from construction operations. B Prevent following types of damage: 1. Compaction of root zone by foot or vehicular traffic, or material storage. 2. Trunk damage from equipment operations,material storage, or from nailing or bolting. 3. Trunk and branch damage caused by ropes or guy wires or machine impacts. 4. Root poisoning from spilled solvents, gasoline,paint, and other noxious materials. 5. Branch damage due to improper pruning or trimming. 6. Damage from lack of water due to: Cutting or altering natural water migration patterns near root zones. Failure to provide adequate watering. 7. Damage from alteration of soil pH factor caused by depositing lime, concrete, plaster, or other base materials near roots. 8. Cutting feeder of roots or roots larger than 1-1/2 inches in diameter. C. Confine Work activities to the identified Work Zone, Right of Way or Easement as described in SECTION 01140, CONTRACTOR'S USE OF PREMISES, Limits of Construction 1.04 DAM AGE ASSESSMENT A When trees, other than those designated for removal,are destroyed or badly damaged f�I as a result of construction operations,remove and replace with same size,species,and variety up to and including 8 inches in trunk diameter. Trees larger than 8 inches in diameter shall be replaced with an 8-inch diameter tree of the same species and variety L and total contract amount will be reduced by an amount determined from the following 01/2008 01563- 1of4 CITY OF PEARLAND TREE AND PLANT PROTECTION International Shade Tree Conference formula: 0.7854 x D2 x $10.00 where D is diameter in inches of tree or shrub trunk measured 12 inches above grade. B All necessary tree replacements shall be as approved by Engineer/Urban Forester. 2.0 PRODUCTS 2.01 MATERIALS A Asphalt paint: Emulsified asphalt or other adhesive, elastic, antiseptic coating formulated for horticultural use on cut or injured plant tissue,free from kerosene and coal creosote. B Burlap: Suitable for use as tree wrapping. C Fertilizer: Liquid containing 20 percent nitrogen, 10 percent phosphorus, and 5 percent potash. 3.0 EXECUTION 3.01 PROTECTION AND MAINTENANCE OF EXISTING TREES AND SHRUBS A Except for trees and shrubs shown on Plans to be removed,all trees and shrubs within the Project Site area are to remain and be protected from damage. B For designated trees to be removed,perform the following: 1. Stake right-of-way limits and identify any tree of diameter greater than 4 inches which is to be removed. Mark trees prior to felling with an X in orange paint, clearly visible, on the trunk, and at eye level. 2. After marking trees give a minimum of 48-hours notice in writing to the Engineer of intent to begin felling operations. 3. Trees whose trunks are only partially in the right-of-way shall be protected and preserved as described below. C For trees or shrubs to remain,perform the following: 1. Trim trees and shrubs only as necessary. Trees and shrubs requiring pruning for construction should also be pruned for balance as well as to maintain proper form and branching habit. Cut limbs at branch collar. No stubs should remain on trees. Branch cuts should not gouge outer layer of tree structure or trunk. 2. Use extreme care to prevent excessive damage to root systems. Roots in construction areas will be cut smoothly with a trencher before excavation begins. Do not allow ripping of roots with a backhoe or other ^� equipment. Temporarily cover exposed roots with wet burlap to prevent roots from drying out. Cover exposed roots with soil as soon as possible. 3. Prevent damage or compaction of root zone (area inside dripline)by construction activities. 01/2008 01563-2 of 4 7 1 E CITY OF PEARLAND TREE AND PLANT PROTECTION Do not allow scarring of trunks or limbs by equipment or other means. Do not store construction materials, vehicles, or excavated material inside dripline of trees. Do not pour liquid materials inside dripline. 4. Water and fertilize trees and shrubs that will remain to maintain their health during construction period. Supplemental watering of landscaping during construction should be done once a week in months receiving average rainfall and twice a week in months receiving below average rainfall. This watering shall consist of saturating soils at least 6 to 8 inches beneath surface. 5. Water areas currently being served by private sprinkler systems while systems are temporarily taken out of service to maintain health of existing landscapes. 6. At option of the Contractor and with the Engineer's permission, trees and shrubs to remain may be temporarily transplanted and returned to original positions under supervision of professional horticulturist. L� 3.02 PROTECTIVE CONTROLS A Protection of trees or shrubs in open area: 1. Install steel drive-in fence posts in protective circle, approximately 8 feet on center, not closer than 4 feet to trunk of trees or stems of shrubs. 2. Drive steel drive-in fence posts 3 feet minimum into ground, leaving 5 feet minimum above ground. 3. For trees or shrubs in paved areas, use moveable posts constructed from concrete-filled steel pipe 2-1/2 inches minimum in diameter mounted in Lrubber auto tires filled with concrete. 4. Mount steel hog-wire on posts. B Timber-wrap protection for trees in close proximity of moving or mechanical equipment and construction work: C 1. Wrap trunk with layer of burlap. 2. Install 2 x 4's or 2 x 6's (5-foot to 6-foot lengths)vertically, spaced 3 inches to 5 inches apart around circumference of tree trunk. 3. Tie in place with 12 to 9 gage steel wire. 3.03 MAINTENANCE OF NEWLY PLANTED TREES A Water newly planted trees adequately to maintain and support healthy plants. B The Contractor guarantees that trees planted for this Work shall remain alive and healthy at least until the end of a one-year warranty period. 1. Within four weeks of notice from Owner, Contractor shall replace,at his expense, any dead trees or any trees that in the opinion of Owner,have become unhealthy or unsightly or have lost their natural shape as a result of additional growth, improper pruning or maintenance, or weather conditions. 01/2008 01563-3 of 4 1 CITY OF PEARLAND TREE AND PLANT PROTECTION 2. When tree must be replaced, the guarantee period for that tree shall begin on date of replacement of tree, subject to the Owner's inspection,for no less than one year. 3. Straighten leaning trees and bear entire cost. 4. Dispose of trees rejected at any time by Engineer at Contractor's expense. 1 END OF SECTION 7 1 1 1 1 1 1 1 1 1 1 1 01/2008 01563-4 of 4 1 1 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER Section 01564 CONTROL OF GROUND WATER AND SURFACE WATER 1.0 GENERAL 1.01 SECTION INCLUDES 7 A Dewatering,depressurizing,draining,and maintaining trench and structure excavations and foundation beds in dry and stable condition. `-1 B Protecting work against surface runoff and rising flood waters. C Disposing of removed water. D References to Technical Specifications: 1. Section 01200—Measurement&Payment Procedures 2. Section 01350—Submittals 3. Section 01570—Trench Safety Systems 4. Section 01565—TPDES Requirements 5. Section 01566—Source Controls for Erosion &Sedimentation E Referenced Standards: 1. Occupational Safety and Health Administration (OSHA) 2. Texas Commission on Environmental Quality(TCEQ) 3. Code of Ordinances, City of Pearland, Texas 4. Water Well Drillers and Pump Installers Advisory Council (WWD/PI) F Definitions: 1. Ground Water Control Systems -installations external to the excavation 1 such as well points, eductors, or deep wells. Ground water control includes dewatering and depressurization. a. Dewatering-lowering the water table and intercepting seepage which `l would otherwise emerge from slopes or bottoms of excavations and disposing of removed water. The intent of dewatering is to increase stability of excavated slopes; prevent dislocation of material from slopes or bottoms of excavations;reduce lateral loads on sheeting and bracing; improve excavating and hauling characteristics of excavated material;prevent failure or heaving of the bottom of excavations;and to provide suitable conditions for placement of backfill materials and construction of structures and other installations. b. Depressurization-reduction in piezometric pressure within strata not 7 controlled by dewatering alone, as required to prevent failure or heaving of excavation bottom. 2. Surface Water Control-diversion and drainage of surface water runoff and 7 rain water away from the excavation. 3. Excavation Drainage -keeping excavations free of surface and seepage water. 02/2008 01564- 1 of 8 i 7 CITY OF PEARLAND CONTROL OF GROUND WATER 7 AND SURFACE WATER 1.02 MEASUREMENT AND PAYMENT EA Measurement for and control of ground water for openpipe excavations cut p p shall be on a linear foot basis and shall not exceed the length of open cut pipe installation in the 7 area requiring ground water control. B Unless indicated as a Bid Item,no separate payment will be made for control of ground 7water for any condition(s) other than those described in this Section, 1.02A. No separate payment will be made for control of surface water. Include the cost to control non-pipe excavation ground water and surface water in price for Work requiring such controls. 7 C Refer to Section 01200—Measurement&.Payment Procedures. 7 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. E B Submit a Ground Water and Surface Water Control Plan for review by the Engineer prior to start of any field work. The plan shall be signed by a Professional Engineer 7 registered in the State of Texas. The plan shall include the following: 1. Results of subsurface investigation and description of the extent and 7 characteristics of water bearing layers subject to ground water control. 2. Names of equipment suppliers and installation subcontractors. 3. A description of proposed ground water control systems indicating 7 arrangement, location, depth and capacities of system components, installation details and criteria, and operation and maintenance procedures. 4. A description of proposed monitoring and control system indicating depths and locations of piezometers and monitoring wells, monitoring installation 7 details and criteria, type of equipment and instrumentation with pertinent data and characteristics. 5. A description of proposed filters including types, sizes, capacities and 7 manufacturer's application recommendations. 6. Design calculations demonstrating adequacy of proposed systems for intended applications. Define potential area of influence of ground water 7 control operation near contaminated areas. 7. - Operating requirements,including piezometric control elevations for dewatering and depressurization. 7 8. Excavation drainage methods including typical drainage layers, sump pump application and other necessary means. 9. Surface water control and drainage installations. 7 10. Proposed methods and locations for disposing of removed water. C Submit the following records upon completed initial installation: Installation and development reports for well points, eductors, and deep wells. 7 02/2008 01564-2 of 8 7 Tj CONTROL OF GROUND WATER 7] CITY OF PEARLAND AND SURFACE WATER 2. Installation reports and baseline readings for piezometers and monitoring1-1 wells. 3. Baseline analytical test data of water from monitoring wells. 4. Initial flow rates. D Submit the following records on a weekly basis during operations: 1. Records of flow rates and piezometric elevations obtained during monitoring of dewatering and depressurization. Refer to this Section, 3.02 "Requirements for Eductor,Well Points, or Deep Wells". 2. Maintenance records for ground water control installations,piezometers, and monitoring wells. E Submit the following records at end of the Work. Decommissioning(abandonment) reports for monitoring wells and piezometers installed by other during the design phase and left for Contractor's monitoring and use. 1.04 PERFORMANCE REQUIREMENTS A Conduct subsurface investigations to identify groundwater conditions and to provide .J parameters for design,installation, and operation of groundwater control systems. 1 B Design a ground water control system, compatible with the requirements of OSHA Standards - 29 CFR,Part 1926, and Section 01570-Trench Safety Systems of these Technical Specifications, to produce the following results: 1. Effectively reduce the hydrostatic pressure affecting excavations. 2. Develop a substantially dry and stable subgrade for subsequent construction �-- operations. 3. Preclude damage to adjacent properties,buildings, structures, utilities, installed facilities, and other work. 4. Prevent the loss of fines, seepage, boils, quick condition, or softening of the foundation strata. 5. Maintain stability of sides and bottom of excavations. C Ground water control systems may include single-stage or multiple-stage well point systems, eductor and ejector-type systems, deep wells, or combinations of these equipment types. 1 D Provide drainage of seepage water and surface water, as well as water from any other source entering the excavation. Excavation drainage may include placement of 1 drainage materials, such as crushed stone and filter fabric, together with sump pumping. E Provide ditches,berms,pumps and other methods necessary to divert and drain surface water from excavation and other work areas. F Locate ground water control and drainage systems so as not to interfere with utilities, I construction operations, adjacent properties, or adjacent water wells. 02/2008 01564-3 of 8 1 9 c CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER G Assume sole responsibility for ground water control systems and for any loss or damage resulting from partial or complete failure of protective measures and any settlement or resultant damage caused by the ground water control operations. Modify ground water control systems or operations if they cause or threaten to cause damage to new construction, existing site improvements, adjacent property, or adjacent water wells,or affect potentially contaminated areas. Repair damage caused by ground water control systems or resulting from failure of the system to protect property as required. H Provide an adequate number of piezometers installed at the locations and depths proper p as required to provide meaningful observations of the conditions affecting the excavation, adjacent structures, and water wells. I Provide environmental monitoring wells installed at the proper locations and depths as required to provide adequate observations of hydrostatic conditions and possible contaminant transport from contamination sources into the work area or into the ground water control system. J Decommission piezometers and monitoring wells installed during design phase studies and left for Contractors monitoring and use. 1.05 ENVIRONMENTAL REQUIREMENTS A Comply with requirements of agencies having jurisdiction. B Comply with TCEQ regulations and WWD/PI Advisory Council for development, P , drilling, and abandonment of wells used in dewatering system. C Obtain permit from TCEQ under the Texas Pollutant Discharge Elimination System (TPDES),for storm water discharge from construction sites. Refer to Section 01565- TPDES, 3.02"Certification Requirements". D Obtain all necessary permits from agencies with control over the use of groundwater and matters affecting well installation, water discharge, and use of existing storm drains and natural water sources. Because the review and permitting process may be lengthy, take early action to pursue and submit for the required approvals. E Monitor ground water discharge for contamination while performing pumping in the vicinity of potentially contaminated sites. CF Implement control of ground and surface water under the provisions of Section 01566 —Source Controls for Erosion&Sedimentation. 2.0 PRODUCTS 2.01 EQUIPMENT AND MATERIALS A Equipment and materials are at the option of Contractor as necessary to achieve desired results for dewatering. Selected equipment and materials are subject to review 02/2008 01564-4 of 8 i CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER of the Engineer through Submittals required in Section 01350 — Submittals, 1.06 7 "Operations and Maintenance Data". B Eductors, well points, or deep wells, where used, must be furnished, installed.and 7 operated by an experienced contractor regularly engaged in ground water control system design, installation, and operation. C Equipment and instrumentation for monitoring and control of the ground water control system includes piezometers and monitoring wells, and devices,such as flow meters, for observing and recording flow rates. D All equipment must be in good repair and operating order. E Sufficient standby equipment and materials shall be kept available to ensure continuous operation, where required. 3.0 EXECUTION 3.01 GROUND WATER CONTROL A Perform a subsurface investigation by borings as necessary to identify water bearing layers,piezometric pressures,and soil parameters for design and installation of ground water control systems. Perform pump tests, if necessary to determine the drawdown characteristics of the water-bearing layers. The results shall be presented in the Ground Water and Surface Water Control Plan. Refer to this Section, 1.03B. B Provide labor, material, equipment, techniques and methods to lower, control and 7 handle ground water in a manner compatible with construction methods and site conditions. Monitor effectiveness of the installed system and its effect on adjacent property. 7 C Install, operate, and maintain ground water control systems in accordance with the Plan. Notify Engineer in writing of any changes made to accommodate field conditions and changes to the Work. Provide revised drawings and calculations with such notification. D Provide for continuous system operation, including nights, weekends, and holidays. Arrange for appropriate backup if electrical power is primary energy source for dewatering system. E Monitor operations to verify that the system lowers ground water piezometric levels at a rate required to maintain a dry excavation resulting in a stable subgrade for prosecution of subsequent operations. F Where hydrostatic pressures in confined water bearing layers exist below excavation, depressurize those zones to eliminate risk of uplift or other instability of excavation or installed works. Allowable piezometric elevations shall be defined in the Plan. '"1 02/2008 01564-5 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER G Maintain water level below subgrade elevation. Do not allow levels to rise until foundation concrete has achieved design strength. H During backfilling,dewatering may be reduced to maintain water level a minimum of 5 feet below prevailing level of backfill. However, do not allow that water level to result in uplift pressures in excess of 80 percent of downward pressure produced by weight of structure or backfill in place. Do not allow water levels to rise into cement stabilized sand until at least 48 hour after placement. L I Provide a uniform diameter for each pipe drain run constructed for dewatering. Remove pipe drain when it has served its purpose. If removal of pipe is impractical, L provide grout connections at 50-foot intervals and fill pipe with cement-bentonite grout or cement-sand grout when pipe is removed from service. J Extent of construction ground water control for structures with a permanent perforated underground drainage system may be reduced,such as for units designed to withstand hydrostatic uplift pressure. Provide a means of draining the affected portion of underground system,including standby equipment. Maintain drainage system during operations and remove it when no longer required. K Remove system upon completion of construction or when dewatering and control of surface or ground water is no longer required. L Compact backfill as required by the Contract Documents. 3.02 REQUIREMENTS FOR EDUCTOR,WELL POINTS, OR DEEP WELLS A For aboveground piping in ground water control system,include a 12-inch minimum length of clear, transparent piping between every eductor well or well point and discharge header so that discharge from each installation can be visually monitored. B Install sufficient piezometers or monitoring wells to show that all trench or shaft excavations in water bearing materials are predrained prior to excavation. Provide separate piezometers for monitoring of dewatering and for monitoring of depressurization. Install piezometers and monitoring wells for tunneling as appropriate Cfor Contractor's selected method of work. C Install piezometers or monitoring wells not less than one week in advance of beginning the associated excavation. D Dewatering may be omitted for portions of underdrains or other excavations,but only Y where auger borings and piezometers or monitoring wells show that soil is predrained by an existing system such that the criteria of the Ground Water and Surface Water Control Plan are satisfied. 02/2008 01564-6 of 8 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER E Replace installations that produce noticeable amounts of sediments after development. F Provide additional ground water control installations or change the methods in the event that the installations according to the Ground Water and Surface Water Control Plan do not provide satisfactory results based on the performance criteria defined by the Plan and by this Section. Submit a revised Plan according to this Section, 1.03A. G Mechanical dewatering equipment shall comply with Chapter 19 NOISE, Code of Ordinances, City of Pearland, Texas. 3.03 EXCAVATION DRAINAGE 1 A Contractor may use excavation drainage methods if necessary to achieve well drained, stable trench conditions. The excavation drainage may consist of the following methods or combination of methods: 1. Sump pumping in combination with: a. Layer of crushed stone and filter fabric. b. Sand and gravel drains. 2. Wells for ground water control. B Use sump pumping and a drainage layer, as defined in ASTM D 2321,placed on the foundation beneath pipe bedding or thickened bedding layer of Class I material. 3.04 MAINTENANCE AND OBSERVATION A Conduct daily maintenance and observation of piezometers or monitoring wells while the ground water control installations or excavation drainage are operating in an area. Keep system in good operating condition. B Replace damaged and destroyed piezometers or monitoring wells with new piezometers or wells as necessary to meet observation schedule. C Cut off piezometers or monitoring wells in excavation areas where piping is exposed, only as necessary to perform observation as excavation proceeds. Continue to maintain and make observations, as specified. D Remove and grout piezometers inside or outside the excavation area when ground water control operations are complete. Remove and grout monitoring wells when directed by the Engineer. 3.05 MONITORING AND RECORDING A Monitor and record average flow rate of operation for each deep well, or for each wellpoint or eductor header used in dewatering system. Also monitor and record water level and ground water recovery. These records shall be obtained daily until steady conditions are achieved, and twice weekly thereafter. 02/2008 01564-7of8 1 CONTROL OF GROUND WATER CITY OF PEARLAND AND SURFACE WATER B Observe and record elevation of water level daily as long as ground water control system is in operation, and weekly thereafter until the Work is completed or piezometers or wells are removed, except when Engineer determines that more frequent monitoring and recording are required. Comply with Engineer's direction for increased monitoring and recording and take measures as necessary to ensure effective dewatering for intended purpose. 3.06 SURFACE WATER CONTROL A Intercept surface water and divert it away from excavations through use of dikes, ditches,curb walls,pipes,sumps or other approved means. The requirement includes temporary works required to protect adjoining properties from surface drainage caused by construction operations. B Divert surface water and seepage water into sumps and pump it into drainage channels or storm drains, when approved by agencies having jurisdiction. Provide settling basins when required by such agencies. C Provide additional surface water control measures or change the methods in the event that the measures according to the Ground Water and Surface Water Control Plan do not provide satisfactory results based on the performance criteria defined by the Plan and by this Section. Submit a revised Plan according to this Section, 1.03B. F"'' END OF SECTION r 02/2008 01564-8 of 8 c CITY OF PEARLAND TPDES REQUIREMENTS Section 01565 TPDES REQUIREMENTS 1.0 GENERAL 1.01 SECTION INCLUDES A Description of the required documentation to be prepared and signed by the Contractor before conducting construction operations,in accordance with the terms and conditions of the Texas Pollutant Discharge Elimination System (TPDES) General Permit as issued March 5,2003 by the Texas Commission on Environmental Quality under the provisions of Section 402 of the Clean Water Act and Section 26.040 of the Texas Water Code. B Contractor's responsibility for implementation,maintenance,and inspection of storm water pollution prevention control measures including,but not limited to,erosion and sediment controls,storm water management plans,waste collection and disposal,off- site vehicle tracking,and other practices shown on the Plans or specified elsewhere in this or other Technical Specifications. C References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01310—Coordination &Meetings 3. Section 01770—Contract Closeout D Referenced Standards: 1. Texas Commission on Environmental Quality(TCEQ) E Other References: 1. Storm Water Pollution Prevention Plan (SWPPP) found in Appendix A of these Technical Specifications. 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 2.0 PRODUCTS - NotUsed 01/2008 01565- 1 of 3 CITY OF PEARLAND TPDES REQUIREMENTS 3.0 EXECUTION 3.01 REQUIRED NOTICES A The Contractor shall complete, sign, and date the Contractor's Notice of Intent(NOI) attached in Appendix A. The signed copy of the Contractor's NOI shall be returned to the Owner. The Owner will complete the Owner's Notice of Intent attached in Appendix A and will submit both notices to the TCEQ. Submission of the NOI is required by both the Owner and the Contractor before construction operations start. B Upon completion of construction and acceptance of the Work by the Owner, the Contractor shall complete, sign, and date the Contractor's Notice of Termination (NOT) attached in Appendix A. 3.02 CERTIFICATION REQUIREMENTS A On the Operator's Information form attached in Appendix A, the Contractor shall complete name, address, and telephone number for the Contractor; the names of persons or firms responsible for maintenance and inspection of erosion and sediment control measures and all Subcontractors. B The Owner will complete and sign the Owner's Certification, shown in Appendix A and provide a copy to the Contractor for inclusion with other project certification forms. C The Contractor and Subcontractors named in the Contractor's Information form shall read, sign, and date the Contractor's/Subcontractor's Certification form, attached in Appendix A. T D The persons or firms responsible for maintenance and inspection of erosion and sediment control measures shall read, sign, and date the Contractor's Inspection and Maintenance Certification form, attached in Appendix A. E The Contractor's Information form and all certification forms shall be submitted to the Owner before beginning construction. F Contractor shall review implementation of the SWPPP in a meeting with the Owner and Engineer prior to start of construction in accordance with Section 01310 — Coordination &Meetings. 3.03 RETENTION OF RECORDS A The Contractor shall keep a copy of the SWPPP at the Project Site or at the Contractor's office from the date that it became effective to the date the Work is accepted by the Owner. B At Contract Closeout, the Contractor shall submit to the Owner all TPDES forms and certifications, as well as a copy of the SWPPP, in accordance with Section 01770— 01/2008 01565-2 of 3 c CITY OF PEARLAND TPDES REQUIREMENTS Contract Closeout. The SWPPP records and data will be retained by Owner for a period of 3 years from the date the Work is accepted by the Owner. 3.04 POSTING OF NOTICES A The following notices shall be posted from the date that this SWPPP goes into effect L until the date the Work is accepted by the Owner: 1. Copies of the Notices of Intent submitted by the Owner and Contractor and a brief Description of Construction Activity being conducted at the Project Site, as given in Article 1 of the SWPPP, shall be posted at the Project Site or at Contractor's office in a prominent place for public viewing. 2. Notice to drivers of equipment and vehicles,instructing them to stop,check, and clean tires of debris and mud before driving onto traffic lanes. Post such notices at every stabilized construction exit area. 3. In an easily visible location on Project Site,post a notice of waste disposal procedures. 4. Notice of hazardous material handling and emergency procedures shall be posted with the NOI on Project Site. Keep copies of Material Safety Data Sheets at a location on Project Site that is known to all personnel. 5. Keep a copy of each signed certification at the Project Site or at Contractor's office. END OF SECTION E E r 01/2008 01565-3 of 3 E CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION Section 01566 SOURCE CONTROLS FOR EROSION AND SEDIMENTATION 1.0 GENERAL 1.01 SECTION INCLUDES A Descriptions of measures and practices,p s, in response to TPDES General Permit TXR 150000, which shall be used on the Work to eliminate or significantly minimize pollutants in discharges into Surface Water in the State by controlling erosion and sediments at their source. B References to Technical Specifications: 1. Section 01550—Stabilized Construction Exit 2. Section 01562—Waste Material Disposal 3. Section 01500 Temporary Facilities and Controls C Definitions: 1. Potential Water Pollutant-any substance that could potentially alter the physical, thermal, chemical, or biological quality of the Surface Water in the State, rendering the water harmful, detrimental, or injurious to humans, animal life, vegetation, or property, or to public health, safety or welfare, or impairs the usefulness or the public enjoyment of the water for any lawful or reasonable purpose. 1.02 MEAUSREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 2.0 PRODUCTS - Not Used 3.0 EXECUTION 3.01 PREPARATION AND INSTALLATION A Contractor shall conduct all construction operations under this Contract in conformance with the erosion control practices described in the Plans and this Technical Specification. B Erosion and sediment control measures shall be in place prior to the start of any Work that exposes the soil, other than as specifically directed by the Engineer to allow soil L testing and surveying. C The Contractor shall install, maintain, and inspect erosion and sediment control measures and practices that operate effectively and as specified in the Plans and in this or other Technical Specifications. 07/2006 01566-1 of 5 7 CITY OF PEARLAND SOURCE CONTROLS FOR 7 EROSION AND SEDIMENTATION J D Equipment and vehicles shall be prohibited by the Contractor from maneuvering on areas outside of the limits of construction or dedicated rights-of-way and easements. Damage caused by construction traffic to erosion and sediment control systems shall be repaired immediately by the Contractor. fl E The Contractor shall be responsible for collecting, storing, hauling,and disposing of spoil, silt, waste materials, and contaminated material resulting from erosion and sediment control measures as specified in this or other Technical Specifications and in compliance with applicable federal, state, and local rules and regulations. 3.02 EXPOSED SOIL A When soil is exposed as a result of clearing,grading,excavating,stockpiling,or other soil disturbing activities, the Contractor shall implement measures to effectively control erosion and prevent the escape of sediments from the Project Site. B Control measures may include the following practices: 1. Preserve existing vegetation to the extent possible. 2. Construct drainage swales, berms, or sediment basins. 3. Maintain grades to minimize the velocity of sheet flow over disturbed areas 7 and promote evaporation and infiltration of storm water directly into the ground. 4. Install filter fabric fences or barriers, sediment traps, seepage basins, gabions, or storm drain inlet protection devices. 5. Utilize vegetative buffer strips, mulching, or riprap C When the placement of topsoil, bank sand, or other soil material is specified,after an area has been brought to grade and immediately prior to placement, loosen the subgrade discing or by scarifying to a depth of at least 2 inches to permit bonding to the subsoil. D When all soil disturbing activities have been completed, establish a perennial vegetative cover on all areas that are not paved, covered by permanent structures, or otherwise permanently stabilized. 3.03 DUST CONTROL 71 A Implement control measures to minimize dust creation and movement on construction sites and roads and to prevent airborne sediment from reaching receiving streams or storm water conveyance systems, to reduce on-site and off-site damage, to prevent health hazards, and to improve traffic safety. B Control blowing dust by using one or more of the following measures: 1. Mulches bound with chemical binders. 2. Temporary vegetative cover. 3. Tillage to roughen surface and bring clods to the surface. 4. Irrigation by water sprinkling. 07/2006 01566-2 of 5 T 7 CITY OF PEARLAND SOURCE CONTROLS FOR L EROSION AND SEDIMENTATION 5. Barriers using solid board fences,burlap fences, crate walls, bales of hay, or 7 similar materials. C Implement dust control measures immediately whenever dust can be observed blowing 7 on the Project Site. 3.04 DEMOLITION AREAS 7 A Demolition activities which create large amounts of dust with significant concentrations of heavy metals or other potential water pollutants shall use methods 7 described in this Section,3.03"Dust Control",to limit transport of airborne pollutants. However, water or slurry used to control dust contaminated with heavy metals or potential water pollutants shall be retained on the Project Site and shall not be allowed 7 to run directly into watercourses or storm water conveyance systems by the appropriate use of control measures described in this Section. Methods of ultimate disposal of these materials shall be carried out in accordance with applicable local, state, and 7 federal health and safety regulations. 3.05 SEDIMENT TRACKING 7 A Minimize off-site tracking of sediments and the generation of dust by construction vehicles, keeping the streets clean or construction debris and mud, by implementing 7 one or more of the following control measures: 1. Restrict all ingress and egress to stabilized construction exits. 2. Stabilize areas used for staging,parking, storage or disposal. 3. Stabilize on-site vehicle transportation routes. 7 4. Remove mud and other debris, washing if necessary, from vehicles prior to entrance onto public roadways from the Project Site. 5. Maintain grade to minimize the occurrence of mud on the Project Site. 7 B Construct stabilized construction areas under the provisions of Section 01550 — Stabilized Construction Exists. CC In addition to Stabilized Construction Exits shovel or sweep the pavement to the extent necessary to keep the street clean. Water-hosing or sweeping of debris and mud off of 7 the street into adjacent areas is not allowed. 3.06 EQUIPMENT MAINTENANCE AND REPAIR 7 A Control equipment maintenance and repair so that oils,gasoline,grease,solvents,and other potential water pollutants cannot be washed directly into receiving streams or 7 storm water conveyance systems. B Control measures mayinclude lude the following practices: 1. Confine maintenance and repair of construction machinery and equipment 7 to areas specifically designated for that purpose. 2. Provide these areas with adequate waste disposal receptacles for liquid as well as solid waste. 7 07/2006 01566-3 of 5 7 CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION 3. Clean and inspect maintenance and repair areas daily. 4. Stabilize the area with coarse aggregate. 5. Maintain grade to prevent surface water from flowing over the area. 6. Place plastic matting, packed clay, tar paper, or other impervious material to prevent contamination of soil in the area. 7. Isolate areas of contaminated soil or other materials to facilitate proper removal and disposal. 7 C Where effective control measures are not feasible,equipment shall be taken off-site for maintenance and repair. 3.07 WASTE COLLECTION AND DISPOSAL A Conduct operations in conformance with the plan provided in Section 01562—Waste fj Material Disposal and utilize such control measures,described in this Section, as may be necessary to eliminate or significantly reduce the discharge of possible water pollutants from the Project Site as a result of waste collection and disposal. B Keep receptacles and waste collection areas neat and orderly to the extent possible. Waste shall not be allowed to overflow its container or accumulate from day-to-day. Locate trash collection points where they will least likely be affected by concentrated storm water runoff. 3.08 WASHING AREAS A Vehicles such as concrete delivery trucks or dump trucks and other construction equipment shall not be washed at locations where the runoff will flow directly into a watercourse or storm water conveyance system. Preventative measures may include the following practices: 1. Designate special areas for washing vehicles. 2. Locate these areas where the wash water will spread out and evaporate or infiltrate directly into the ground, or where the runoff can be collected in a 7 temporary holding or seepage basin. 3. Beneath wash areas construct a gravel or rock base to minimize mud production. B Construct washing areas under the provisions of Section 01550 — Stabilized Construction Exists. 7 3.09 STORAGE AND USAGE OF POTENTIAL WATER POLLUTANTS A Store and use potential water pollutants such as pesticides,fertilizers,distillate fuels, lubricants, solvents, cements, paints, acids, caustics, and other toxic substances in accordance with manufacturers' guidelines, Material Safety Data Sheets, and with local, state, and federal regulations. 1 07/2006 01566-4 of 5 1 CITY OF PEARLAND SOURCE CONTROLS FOR EROSION AND SEDIMENTATION B Isolate these substances in areas where they are to be stored,opened or used such that they will not cause pollution of runoff from the Project Site. Preventative measures may include the following practices: 1. Stabilize the area with coarse aggregate. 2. Store containers on raised platforms. 3. Place plastic matting,packed clay, tar paper, or other impervious material to prevent contamination of soil in the area. 4. Provide protective cover or weather proof enclosure. 5. Minimize accidental spillage. 6. Keep containers tightly closed. 7. Periodically inspect containers for leakage. 8. Maintain grade to prevent surface water from flowing over the area. 9. Provide berms, filter fabric fences or barriers, or sediment basins. 10. Designate washing areas for containers and other items that have come in contact with potential water pollutants. C Avoid overuse of substances such as pesticides and fertilizers which could produce contaminated runoff. 3.10 SANITARY FACILITIES A Provide the Project Site with adequate portable toilets for workers in accordance with Section 01500—Temporary Facilities and Controls,and applicable health regulations. B Control areas where sanitary facilities are located so that sewage or chemicals will not be washed directly into receiving streams or storm water conveyance systems by using one or more of the following measures. 1. Inspect the facilities daily. 2. Service the facilities as often as necessary to maintain cleanliness and prevent overflows. 3. Stabilize the area with coarse aggregate 4. Maintain grade to prevent surface water from flowing over the area END OF SECTION r 07/2006 01566-5 of 5 CITY OF PEARLAND TRENCH SAFETY SYSTEM Section 01570 TRENCH SAFETY SYSTEM 1.0 GENERAL 1.01 SECTION INCLUDES A Trench safety system for the construction of trench excavations. B Trench safety system for excavation of utilities, excavation of structures, and embankment which fall under provisions of federal, state, or local excavation safety L laws. C References to Technical Specifications: 1. Section 01200—Measurement&Payment Procedures 2. Section 01350—Submittals D Referenced Standards: 1. Occupational Safety and Health Administration (OSHA) E Definitions: 1. Trench. A narrow excavation (in relation to its depth)made below the surface of the ground. In general, the depth is greater than the width,but the width of a.trench(measured at the bottom)is not greater than 15 feet. 2. Trench safety system requirements apply to larger open excavations if the erection of structures or other installations limits the space between the excavation slope and the installation to dimensions equivalent to a trench as defined. 3. Trench safety systems include both Protective Systems and Shoring Systems but are not limited to sloping, sheeting, trench boxes or trench shields, slide rail systems, sheet piling, cribbing, bracing, shoring, dewatering or diversion of water to provide adequate drainage. a. Protective System:A method of protecting employees from cave-ins, from material that could fall or roll from an excavation face or into an excavation, or from the collapse of an adjacent structure. Cb. Shoring System: A structure, which supports the sides of an excavation, to prevent cave-ins, maintain stable soil conditions, or to prevent movements of the ground affecting adjacent installations or improvements. c. Special Shoring: A shoring system meeting Special Shoring Requirements for locations identified on the Plans. 4. Competent Person-one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them. 07/2006 01570- 1 of 4 7 CITY OF PEARLAND TRENCH SAFETY SYSTEM 1.02 MEASUREMENT AND PAYMENT A Measurement for trench safety systems used on utility excavations is on a linear foot basis,measured along the centerline of the trench. Payment for trench safety systems includes payment for manholes and other line structures. B Unless indicated in as a Bid Item, no separate payment will be made for shoring systems under this Section. Include cost in Bid Items for trench safety systems. C If shown on the Plans and included in Section 00300—Bid Proposal as a separate Bid Item, Measurement and Payment for Special Shoring system installation for trench excavation is on a square foot basis, measured and completed in place. D Unless indicated as a Bid Item, no separate payment will be made for trench safety systems used on structural excavations under this Section. Include cost for trench safety system used on structural excavations in applicable structure installation. E Unless indicated as a Bid Item, no separate payment will be made for trench safety systems used on roadway excavation or embankment under this Section. Include cost in applicable Sections. F Refer to Section 01200—Measurement&Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit a safety plan specifically for the construction of trench excavation,excavation of utilities, excavation of structures, and embankment which fall under provisions of 1 federal, state, or local excavation safety laws. Design the Trench Safety Plan to be in accordance with OSHA Standards - 29CFR governing the presence and activities of individuals working in and around trench excavations, and in accordance with any Special Shoring requirements at locations shown on the Plans. Include in the plan, submittal of the contact information for the Competent Person C Have Shop Drawings for trench safety systems sealed, as required by OSHA, by a Professional Engineer, licensed by the State of Texas, retained and paid by the Contractor. 1.04 REGULATORY REQUIREMENTS A Install and maintain trench safety systems in accordance with the provision of J Excavations,Trenching,and Shoring,OSHA Standards—29 CFR,Part 1926,Subpart P, as amended, including Final Rule, published in the Federal Register Vol. 54, No. 209 on Tuesday, October 31, 1989. The sections that are incorporated into these Technical Specifications, by reference, include Standard 1926.650—652. T 07/2006 01570-2 of 4 I CITY OF PEARLAND TRENCH SAFETY SYSTEM B A reproduction of the OSHA Standards — 29 CFR included in Subpart P - "Excavations"from the Federal Register Vol.54,No.209 is available upon request to c Contractors bidding on the Work. The Owner assumes no responsibility for the accuracy of the reproduction. The Contractor is responsible for obtaining a copy of this section of the Federal Register. C Include in the Trench Safety Program measures that establish compliance with the standard interpretation of the General Duty Clause, Section 5.(a)(1), of the Occupational Safety and Health Act of 1970—20 USC 654 which states,"Employers must shore or otherwise protect employees who walk/work at the base of an embankment from possible collapse." D Legislation that has been enacted bythe State of Texas with regard to Trench Safety Systems is hereby incorporated,by reference,into these specifications. Under Texas Statutes, refer to Chapter 756 of the Health and Safety Code, SUBCHAPTER C. TRENCH SAFETY. E Reference materials,if developed for this Work,will be issued by the Engineer along with the Bid Documents, including the following: 1. Geotechnical information obtained for use in design of the trench safety system. 2. Special Shoring Requirements. 1.05 INDEMNIFICATION A Contractor shall indemnify and hold harmless the Owner, its employees, and agents, from any and all damages,costs(including,without limitation,legal fees,court costs, and the cost of investigation),judgments or claims by anyone for injury or death of persons resulting from the collapse or failure of trenches constructed under this Contract. B Contractor acknowledges and agrees that this indemnity provision provide s indemnity for the Owner in case the Owner is negligent either by act or omission in providing for trench safety, including, but not limited to safety program and design reviews, inspections, failures to issue stop work orders, and the hiring of the Contractor. C Review of the safety program by the Engineer will only be in regard to compliance with the Contract Documents and will not constitute approval by the Engineer nor relieve Contractor of obligations under state and federal trench safety laws. 2.0 PRODUCTS - Not Used C3.0 EXECUTION 3.01 INSTALLATION A Install and maintain trench safety systems in accordance with provisions of OSHA Standards—29 CFR. 07/2006 01570-3 of 4 CITY OF PEARLAND TRENCH SAFETY SYSTEM B Specially designed trench safety systems shall be installed in accordance with the Contractor's trench excavation safety program for the locations and conditions fl identified in the program. C Install Special Shoring at the locations shown on the Plans. D Obtain verification from a Competent Person,defined in this Section and as identified in the Contractor's Trench Safety Program, that trench boxes and other pre- manufactured systems are certified for the actual installation conditions. 3.02 INSPECTION 7 A Conduct daily inspections by Contractor or Contractor's independently retained consultant, of the trench safety systems to ensure that the installed systems and operations meet OSHA Standards—29 CFR and other personnel protection regulations requirements. B If evidence of possible cave-ins or slides is apparent, immediately stop work in the trench and move personnel to safe locations until necessary precautions have been taken to safeguard personnel. C Maintain a permanent record of daily inspections. 3.03 FIELD QUALITY CONTROL ..� A Verify specific applicability of the selected or specially designed trench safety systems to each field condition encountered on the Work. END OF SECTION fl 7 7 i 07/2006 01570-4 of 4 CITY OF PEARLAND PROJECT IDENTIFICATION SIGNS Section 01580 ^� PROJECT IDENTIFICATION SIGNS 1.0 GENERAL 1.01 SECTION INCLUDES A. Project identification sign description. B. Installation. C. Maintenance and removal. 1.02 UNIT PRICES A. No separate payment will be made for design, fabrication, installation, and ..I maintenance of project identification signs under this Section. Include cost of work performed under this Section in the pay item for Section 01505 - Mobilization. B. If changes to project identification signs are requested by the City Engineer to keep them current,payment will be made by change order. C. Skid-mounted signs shall be relocated as directed by the City Engineer at no additional cost to the City. Post-mounted signs shall be relocated once, if directed in writing by the City Engineer, at no additional cost to the City. If a post- mounted sign is relocated more than once at the written direction of the City Engineer,payment will be made by change order. 1.03 SYSTEM DESCRIPTION A. Sign Construction: Project identification signs shall be constructed of new materials and painted new for the project. Construct post-mounted signs as shown on Construction Sign Details. B. Appearance: Project identification signs shall be maintained to present a clean fl and neat look throughout the project duration. C. Sign Manufacturer/Maker: Experienced as a professional sign company. D. Sign Placement: Place signs at locations as directed by the City Engineer. The City Engineer will provide sign placement instructions at the Pre-construction 7 Meeting. 1 1. A linear project is one involving paving, overlay, sewer lines, storm drainage, or water mains that run in the right-of-way over a distance. A 7 linear project requires a project identification sign at each end of the construction site. 05/2007 01580-1 CITY OF PEARLAND PROJECT IDENTIFICATION SIGNS 2. Single Site or Building Projects: Provide one project identification sign. I 3. Multiple Sites: Provide one project identification sign at each site. 4. Sign Relocation: As work progresses at each site, it may be necessary 7. to move and relocate project identification signs. Relocate signs as directed in writing by the City Engineer. E. Alternate Skid-mounted Sign Construction: Post-mounted signs are preferred,but skid-mounted signs are allowed, especially for projects with noncontiguous locations where work progresses from one location to another. The skid structure shall be designed so that the sign will withstand a 60-mile-per-hour wind load directly to the face or back of the sign. Use stakes, straps, or ballast. Approval of the use of skid-mounted signs shall not release the Contractor from responsibility of maintaining a project identification sign on the project site and shall not make the City responsible for the security of such signs. 1.04 SUBMITTALS A. Submit shop drawings under provisions of Section 01350- Submittal Procedures. B. Show content, layout, lettering style, lettering size, and colors. Make sign and lettering to scale, clearly indicating condensed lettering, if used. 2.0 PRODUCTS 2.01 SIGN MATERIALS A. Structure and Framing: All sign materials shall be new. 1. Sign Posts: Use 4-inch by 4-inch treated wood posts, sized to fix top of sign at 6 FEET ABOVE GROUND. 2. Sign Supports and Skid Bracing: 2-inch by 4-inch wood framing material. 3. Skid Members: 2-inch by 6-inch wood framing material. 4. Fasteners: a. Use galvanized steel fasteners. b. Use 3/8-inch by 5-1/2-inch button head carriage bolts to attach sign to posts. Secure with nuts and flat head washers at locations as recommended by Sign Manufacturer. c. Cover button heads with white reflective film or paint to match sign background B. Sign and Sign Header: Use medium density overlaid marine plywood, minimum 1/2-inch thick. Use full-size 4-foot by 8-foot sheets for sign and a single piece for header to minimize joints; do not piece wood to fabricate a sign face. p�q C. Paint and Primers: White paint used to prime surfaces and to resist weathering 4L shall be an industrial grade, fast-drying, oil-based paint with gloss finish. Paint structural and framing members white on all sides and edges to resist weathering. 05/2007 01580-2 i CITY OF PEARLAND PROJECT IDENTIFICATION SIGNS Paint sign and sign header material white on all sides and edges to resist weathering. Paint all sign surfaces with this weather-protective paint prior to "� adding any sign paint or adhesive applications. D. Colors: Follow criteria established by attached Exhibit 3.0 EXECUTION 3.01 INSTALLATION ' A. Install project identification signs within 10 calendar days after Date of Commencement. B. Erect signs where designated by the City Engineer at the Pre-construction Meeting or as described in part 1.03 of this Section. Position the sign in such a i manner as to be fully visible and readable to the general public. C. Erect sign level and plumb. �} D. If mounted on posts, sink posts a minimum of 30 inches below grade in 10-inch diameter posthole. Stabilize posts with sharp sand or concrete to minimize lateral motion. Leave a minimum of 8 feet of post above existing grade for mounting of the sign and header. E. Erect sign so that the top edge of the sign, is no higher than 6 feet above existing grade. 3.02 MAINTENANCE AND REMOVAL A. Keep signs and supports clean. Repair deterioration and damage. 1 B. Remove signs, framing, supports, and foundations to a depth of 2 feet upon completion of Project. Restore the area to a condition equal to or better than before construction. END OF SECTION 1 1 1 05/2007 01580-3 7 CITY OF PEARLAND PROJECT IDENTIFICATION SIGNS 7 PROJECT IDENTIFICATION SIGN 7 EXHIBIT 7 .. . .. .._ . . . . . .. ... .. .....„ . 7 . . -.._ , -, .. .. ,, . . '". :First'" r 40 Imgressio e 7 � e�r .a � '� ,r, n,„.x...`a u.µ nn . ,,: .:.4,,,,..4.4-„,„,„:,1.::3,4 ...„;. ,.-f,.,.it, .qi,;:e.„4,. SOUTHWEST ENVIRONMENTAL CENTER = -7 ,,,-4::::-,,,,„:,:,....... „4,,,,,,,..„...A:„.-: ���" nr >: WASTEWATER TREATMENT PLANT EXPANSION Na,1 l66IECT1➢E6TITIC6TiBs 516666E Y CIY' 'OF ,EARLAN PROJECT SCHEDULE:JULY 2007 'a�a.s. " CAPtfALt'POJ t' i SRO 4`. 1rw' MAYaatOM :a k3 ENGINEER:CARTER&BURGESS,INC. ,cayman. i cOW,,q,. 7..y.0+A4D-4 I:.:�. :'MUM Tuns r813i`aaoyn3a414ifiiiesA~$ CONSTRUCTION COST:UNKNOWN Ia,m,az1.m ,.fLtluJ c2ROH'I!.SRY4 AM E .ni.µa N,� :: a.of OtaCa6d pBGiGALL COR"SY4:RION 5`G-ii-A . HA -. CONTRACTOR:UNKNOWN h-md 7 r4., S F' n.. mc��.n ,vn < . ,...: 1 + •m a.urum+z7:vc+cn.:.xm e"na,KtvvM+Paves rrr����iii Z aptMv;vvm;''.. ., L Typical4'x8'x112"MD 0 single sided site sign.Installs on two 'raunusl w mf.� 4"x4"x 8'treated#2 C C A posts.Set in sharp sand or concrete 1f6 VOLT ELECTRICAL SERVICEWEST;OPf 4cEI LPRMA G EU:V -.SERVICES TO fFT ac+ . _ . . , V5ESi AfP APPROVALminimum. CLIENT ; C . . .,,, . . . . . ... . . 7 , . . . . .. . . ._.:. .•..,, : ... ... . :..-- .,. .. .. , ., . , ,.. 7 C 7 7 _ 05/2007 01580-4 7 CITY OF PEARLAND MATERIAL AND EQUIPMENT Section 01600 MATERIAL AND EQUIPMENT 1.0 GENERAL �- 1.01 SECTION INCLUDES A Requirements for transportation, delivery, handling, and storage of materials and equipment. B References to Technical Specifications: 1. Section 01566—Source Controls for Erosion &Sedimentation 1.02 MEASUREMENT AND PAYMENT A Unles s indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this work is a component. 1.03 PRODUCTS A Products: Means material,equipment,or systems forming the Work. Does not include machinery and equipment used for preparation,fabrication,conveying and erection of the Work. Products may also include existing materials or components designated for reuse. B Do not reuse materials and equipment, designated to be removed,except as specified by the Contract Documents. C Provide equipment and components from the fewest number of manufacturers as is practical, in order to simplify spare parts inventory and to allow for maximum interchangeability of components. For multiple components of the same size,type or application, use the same make and model of component throughout the Work. 1.04 TRANSPORTATION A Make arrangements for transportation, delivery, and handling of equipment and materials required for timely completion of the Work. B Transport and handle products in accordance with instructions. C Consign and address shipping documents to the proper party giving name of Project, street number, and City. Shipments shall be delivered to the Contractor. 1.05 DELIVERY A Arrange deliveries of products to accommodate the Construction Schedule and in ample time to facilitate inspection prior to installation. Avoid deliveries that cause lengthy storage or overburden of limited storage space. 07/2006 01600- 1 of 3 Fal CITY OF PEARLAND MATERIAL AND EQUIPMENT 7 B Coordinate deliveries to avoid conflict with Work and conditions at the Project Site and to accommodate the following: 1. Work of other contractors or the Owner. 2. Limitations of storage space. 3. Availability of equipment and personnel for handling products. 4. Owner's use of premises. C Have products delivered to the Project Site in manufacturer's original, unopened, labeled containers. D Immediately upon delivery, inspect shipment to assure: 1. Product complies with requirements of Contract Documents. 2. Quantities are correct. 3. Containers and packages are intact; labels are legible. 4. Products are properly protected and undamaged. 1.06 PRODUCT HANDLING A Coordinate the off-loading of materials and equipment delivered to the Project Site. If necessary to move stored materials and equipment during construction, Contractor shall relocate materials and equipment at no additional cost to the Owner. ^y B Provide equipment and personnel necessary to handle products, including those provided by the Owner,by methods to prevent damage to products or packaging. C Provide additional protection during handling as necessary to prevent breaking scraping,marring, or otherwise damaging products or surrounding areas. D Handle products by methods to prevent over bending or overstressing. E Lift heavy components only at designated lifting points. F Handle materials and equipment in accordance with Manufacturer's recommendations. G Do not drop, roll, or skid products off delivery vehicles. Hand carry or use suitable T materials handling equipment. 1.07 STORAGE OF MATERIAL A Store and protect materials in accordance with manufacturer's recommendations and requirements of these Technical Specifications. Control storage of potential water pollutants in conformance with Section 01566 — Source Controls for Erosion & Sedimentation. B Make necessary provisions for safe storage of materials and equipment. Place loose soil materials,and materials to be incorporated into the Work to prevent damage to any part of the Work or existing facilities and to maintain free access at all times to all parts of the Work and to utility service company installations in the vicinity of the Work. 7 07/2006 01600-2 of 3 7 1 CITY OF PEARLAND MATERIAL AND EQUIPMENT C Keep materials and equipment neatly and compactly stored in locations that will cause a minimum of inconvenience to other contractors, public travel, adjoining owners, tenants, and occupants. Arrange storage in a manner to provide easy access for inspection. D Provide adequately ventilated, watertight storage facilities with floor above ground level for materials and equipment susceptible to weather damage. E Restrict storage to areas available on the construction site for storage of material and equipment as shown on Plans or approved by the Project Manager. F Provide off-site storage and protection when on-site storage is not adequate. G Do not use lawns, grass plots, or other private property for storage purposes without written permission of the owner or other person in possession or control of such premises. Damage to lawns,sidewalks,streets or other improvements shall be repaired or replaced to the satisfaction of the Project Manager. H Protect stored materials and equipment against loss or damage. I Store materials in manufacturers'unopened containers. J Materials delivered and stored along the line of the Work shall be not closer than 3 feet to any fire hydrant. Public and private drives and street crossings shall be kept open. K The total length which materials may be distributed along the route of construction at any one time is 1000 lineal feet, unless otherwise approved in writing by the Project Manager. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION 07/2006 01600-3 of 3 E E CITY OF PEARLAND PRODUCT OPTIONS AND SUBSTITUTIONS Section 01630 PRODUCT OPTIONS AND SUBSTITUTIONS 1.0 GENERAL 1.01 SECTION INCLUDES A Options for making product or process selections. B Procedures for proposing equivalent construction products or processes,including pre- approved, and approved products or processes C C References to Technical Specifications: 1. Section 01350—Submittals 1.02 SUBMITTALS A Make Submittals required by this and related Sections under the provisions of Section 01350—Submittals. 1.03 DEFINITIONS A Product: Means,materials,equipment,or systems incorporated into the Work.Product does not include machinery and equipment used for production,fabrication,conveying, and erection of the Work. Products may also include existing materials or components designated for re-use. B Process: Any proprietary system or method for installing system components resulting in an integral, functioning part of the Work. For this Section, the word Product includes Processes. 1.04 SELECTION OPTIONS A Pre-approved Products: Products of certain manufacturers or suppliers are designated in the Technical Specifications as"pre-approved". Products of other manufacturers or suppliers will not be acceptable under this Contract and will not be considered under the submittal process for approving alternate products. B Approved Products: Products of certain manufacturers or suppliers designated in the Technical Specifications followed by the words "or approved equal". Approval of f alternate products not listed in the Technical Specifications may be obtained through provisions of this Section and Section 01350—Submittals. The procedure for approval of alternate products is not applicable to Pre-approved Products. C Product Compatibility: To the maximum extent possible,provide products that are of the same type or function from a single manufacturer,make, or source. Where more C than one choice is available as a Contractor's option, select a product which is compatible with other products already selected, specified, or in use by the Owner. 07/2006 01630- 1 of 3 E 7 CITY OF PEARLAND PRODUCT OPTIONS AND SUBSTITUTIONS 71 1.05 CONTRACTOR'S RESPONSIBILITY A Furnish information the Engineer deems necessary to judge equivalency of the 7 alternate product. B Pay for laboratory testing as well as any other review or examination cost needed to 7 establish the equivalency between products which enables the Engineer to make such a judgment. C If the Engineer determines that an alternate product is not equivalent to that named in the Technical Specifications,the Contractor shall furnish one of the specified products. 1.06 ENGINEER'S REVIEW A Alternate products may be used only if approved in writing by the Engineer. The 7 Engineer's determination regarding acceptance of a proposed alternate product is final. B Alternate products will be accepted if the product is judged by the Engineer to be "� equivalent to the specified product or to offer substantial benefit to the Owner. 1 C The Owner retains the right to accept any product deemed advantageous to the Owner, and similarly, to reject any product deemed not beneficial to the Owner. 7 1.07 SUBSTITUTION PROCEDURE A Collect and assemble technical information applicable to the proposed product to aid in el determining equivalency as related to the Approved Product specified. B Submit a written request for a product to be considered as an alternate product along 7 with the product information within fourteen(14)days after the Effective Date of the Agreement. 7 C After the submittal period has expired, requests for alternate products will be considered only when a specified product becomes unavailable because of conditions beyond the Contractor's control. 7 D Submit 5 copies of each request for alternate product approval. Include the following information: 1. Complete data substantiating compliance of proposed substitution with Contract Documents. 2. For products: 7 a. Product identification, including manufacturer's name and address. b. Manufacturer's literature with product description, performance and test data, and reference standards. c. Samples, as applicable. d. Name and address of similar projects on which product was used and —1 date of installation. Include the name of the Owner, Architect/Engineer, and installing contractor. 07/2006 7 01630-2of3 1 CITY OF PEARLAND PRODUCT OPTIONS AND SUBSTITUTIONS 3. For construction methods: a. Detailed description of proposed method. b. Shop Drawings illustrating methods. 4. Itemized comparison of proposed substitution with product or method specified. 5. Data relating to changes in Construction Schedule 6. Relationship to separate contracts,if any. 7. Accurate cost data on proposed substitution in comparison with product or method specified. 8. Other information requested by the Engineer. E Approved alternate products will be subject to the same review process as the specified product would have been for Shop Drawings, Product Data, and Samples. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - NotUsed END OF SECTION r E 07/2006 01630-3 of 3 r CITY OF PEARLAND FIELD SURVEYING Section 01720 FIELD SURVEYING 1.0 GENERAL 1.01 SECTION INCLUDES A Requirements for surveyors and surveys. B Procedures pertaining to survey control points and reference points. C References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01760—Project Record Documents 1.02 MEASUREMENT AND PAYMENT C A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 QUALITY CONTROL A Conform to State of Texas laws for surveys requiring licensed surveyors. Employ a land surveyor acceptable to Engineer. 1.04 SUBMITTALS CA Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit to Engineer the name, address, and telephone number of Surveyor before starting survey work. C Submit documentation verifying accuracy of survey work on request. 1.05 PROJECT RECORD DOCUMENTS A Maintain a complete and accurate log of control and survey work as it progresses. B Submit Record Documents under provisions of Section 01760 — Project Record Documents. 1.06 EXAMINATION A Verify locations of survey control points prior to starting Work. B Notify Engineer immediately of any discrepancies discovered. 07/2006 01720- 1 of 2 E 1 CITY OF PEARLAND FIELD SURVEYING 7 1.07 SURVEY REFERENCE POINTS A Control datum for survey is that established by Owner-provided survey and indicated on Plans. B Locate and protect survey control points,including property corners,prior to starting site work. Use caution to preserve permanent reference points during construction. C The Contractor shall not reset; nor cause to be reset, lost, disturbed, or damaged; control points. Promptly notify Engineer of disturbance or damage to any control point(s). D Notify Engineer 48 hours in advance of need for relocation of reference points due to changes in grades or other reasons. E Report promptly to Engineer the loss or destruction of any reference point. F Any re-staking of control points lost,disturbed,or damaged by Contractor's operations will be provided by Owner at Contractor's expense. G Employ a Registered Public Land Surveyor to reset any missing,disturbed,or damaged —1 monumentation. 1.08 SURVEY REQUIREMENTS A Utilize recognized engineering survey practices. B Establish a minimum of two permanent bench marks on Project Site, referenced to established control points. Record locations, with horizontal and vertical data, on Project Record Documents. C Establish and record in survey notes elevations, lines and levels to provide quantities 1 required for Measurement and Payment and to provide appropriate controls for the Work. Locate and lay out by instrumentation and similar appropriate means: 1. Site improvements including pavements; stakes for grading;fill and topsoil placement; utility locations, slopes, and invert elevations. 2. Grid or axis for structures. 3. Mounumented Baseline. D Verify periodically layouts by same means. 2.0 PRODUCTS - Not Used 3.0 EXECUTION - Not Used END OF SECTION 1 07/2006 01720-2of2 7 CITY OF PEARLAND CUTTING AND PATCHING Section 01730 CUTTING AND PATCHING 1.0 GENERAL 1.01 SECTION INCLUDES A Cutting, patching and fitting of Work to existing facilities, or to accommodate installation or connection of Work with existing facilities, or to uncover Work for access, inspection or testing. B References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01630—Product Options &Substitutions 1.02 MEASURMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit written notice to the Engineer requesting consent to proceed prior to cutting which may affect structural integrity or design function,Owner operations,or work of fl another contractor. C Include the following in submittal: 1. Identification of Project. 2. Description of affected Work. 3. Necessity for cutting. 4. Effect on other work and on structural integrity. 5. Include description of proposed Work: a. Scope of cutting and patching. b. Contractor, subcontractor or trade to execute Work. c. Products proposed to be used. d. Extent of refinishing. ..� e. Schedule of operations. J 6. Alternatives to cutting and patching, if any. D Should conditions of Work or schedule indicate change of materials or methods, submit a written recommendation to the including: Engineer g� 1. Conditions indicating change. 2. Recommendations for alternative materials or methods. 3. Submittals as required for substitutions in Section 01630—Product Options &Substitutions. 7 07/2006 01730- 1 of 3 I 1 7 CITY OF PEARLAND CUTTING AND PATCHING C E Submit written notice to the Engineer designating time Work will be uncovered for 7 observation. Do not begin cutting or patching operations until authorized by the Engineer. 1.04 CONNECTIONS TO EXISTING FACILITIES 7 A Perform construction necessary to complete connections and tie-ins to existing facilities. Keep all existing facilities in continuous operation unless otherwise 7 specifically permitted in these Technical Specifications or approved by the Engineer. B Coordinate with the Engineer,interruption of service requiring connection into existing 7 facilities. Bypassing of wastewater or sludge to waterways is not permitted. Provide temporary pumping facilities to handle wastewater if necessary. Use temporary bulkheads (e.g., inflatable plugs) to minimize disruption. Provide temporary power 7 supply and piping to facilitate construction where necessary. C Submit a detailed schedule of proposed connections,including shut-downs and tie-ins. Include in the submittal the proposed time and date as well as the anticipated duration C of the Work. Submit the detailed schedule coordinated with the construction schedule. 1. Provide specific time and date information to the Engineer 48 hours in 7_ advance of proposed Work. D Proce dures and Operations: 1. The Contractor may operate existing pumps, valves and gates required for 7 sequencing procedures only as directed by the Engineer. Do not operate any valve, gate or other item of equipment without permission of the Owner and the knowledge of the Engineer. 7 2. Insofar as possible,equipment shall be tested and in operating condition before final tie-ins are made to connect equipment to the existing facility. 3. Carefully coordinate Work and schedules. Provide written notice to the 7Engineer at least 48 hours before shut-downs or by-passes are required. 2.0 PRODUCTS - Not Used. C3.0 EXECUTION 7 A Perform activities to avoid interference with facility operations and the Work of others in accordance with Section 00700—General Conditions of the Agreement. B Execute cutting and patching,including excavation,backfill, and fitting to: Remove and replace defective Work or Work not conforming to the Plans and Technical Specifications. 2. Take samples of installed Work as required for testing. 7 3. Remove construction required to provide for specified alteration or addition to existing Work. 7 4. Uncover Work to provide for inspection or reinspection of covered Work by the Engineer or regulatory agencies having jurisdiction. 5. Connect any Work that was not accomplished in the proper sequence to completed Work. 7 07/2006 01730-2 of 3 7_ CITY OF PEARLAND CUTTING AND PATCHING 6. Remove or relocate existing utilities and pipes which obstruct Work to which connections must be made. 7. Make connections or alterations to existing or new facilities. 8. Provide openings, channels, chases and flues,if any, and do cutting,patching and finishing. 1 C Restore existing Work to a state equal to or better than that prior to cutting and patching. Restore new Work to standards of these Technical Specifications. D Support,anchor,attach,match, trim and seal materials to the Work of others. Unless otherwise specified, furnish and install sleeves, inserts, hangers, required for the ,..� execution of the Work. E Provide shoring, bracing and support as required to maintain structural integrity and protect adjacent Work from damage during cutting and patching. Before cutting beams 1-1 or other structural members, anchors, lintels or other supports, request written instructions from the Engineer. Follow such instructions, as applicable. END OF SECTION 1 1 I J 1 1 1 07/2006 01730-3of3 CITY OF PEARLAND STARTING SYSTEMS fl Section 01750 7 STARTING SYSTEMS 1.0 GENERAL 7 1.01 SECTION INCLUDES A Starting systems. B Demonstration and instructions. C Testing, adjusting, and balancing. D References to Technical specifications: 7 1. Section 01350—Submittals 2. Section 01430—Contractor's Quality Control 1.02 MEASUREMENT AND PAYMENT 71 A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350— Submittals. B Submit a written report that equipment or system has been properly installed and is functioning correctly. 2.0 PRODUCTS - Not Used 3.0 EXECUTION 3.01 PREPARATION A Contractor shall conduct all start-up operations under this Contract in conformance T with Section 01430—Contractor's Quality Control. B Coordinate schedule for start-up of various equipment and systems. T C Notify Engineer 7 days prior to startup of each item. D Verify that each piece of equipment or system has been checked for proper lubrication, drive rotation, belt tension, control sequence, or other conditions which may cause damage. E Verify that tests, meter readings, and specified electrical characteristics agree with those required by the equipment or system manufacturer. 07/2006 01750- 1of2 7 1 CITY OF PEARLAND STARTING SYSTEMS F Verify wiring and support components for equipment are complete and tested. G Execute start-up under Contractor's supervision in accordance with manufacturer's instructions. H When specified in individual specification sections,require manufacturer to provide authorized representative to be present at site to inspect,check and approve equipment or system installation prior to and during start-up,and to supervise placing equipment or system in operation. 3.02 DEMONSTRATION AND INSTRUCTIONS A Demonstrate operation and maintenance of products to Owner two weeks minimum prior to date of Substantial Completion. B Utilize operation and maintenance manuals as basis for instruction. Review contents of manual with Owner in detail to explain all aspects of operation and maintenance. C Demonstrate start-up, operation, control, adjustment, trouble-shooting, servicing, maintenance, and shutdown of each item of equipment at agreed-upon times, at equipment location. D Prepare and insert additional data in operations and maintenance man uals nuals when need for additional data becomes apparent during instruction. 3.03 TESTING,ADJUSTING,AND BALANCING A Contractor shall start, test, adjust, balance, and provide reports on all installed equipment as provided for in this section. B Owner may also appoint, employ, and pay for services of an independent firm to 7 perform testing, adjusting, and balancing. Reports will be submitted by the independent firm to the Owner indicating observations and results of the tests and indicating compliance or non-compliance with specified requirements and with the requirements of the Contract Documents. C Owner's employment of an independent firm shall not relieve the Contractor's responsibility under this section. END OF SECTION 07/2006 01750-2 of 2 E ' C CITY OF PEARLAND PROJECT RECORD DOCUMENTS 7 Section 01760 7 PROJECT RECORD DOCUMENTS 1.0 GENERAL 7 1.01 SECTION INCLUDES CA Maintenance and Submittal of Record Documents and Samples. B References to Technical Specifications: 7 1. Section 01350—Submittals 2. Section 01770—Contract Closeout 7 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. 7 1.03 SUBMITTALS 7 A Make Submittals required by this and related Sections under the provisions of Section 01350—Submittals. 7 1.04 MAINTENANCE OF DOCUMENTS AND SAMPLES A Maintain one copy of Record Documents at the Project Site in accordance with Section PI 00700— General Conditions of Agreement, 3.02 "Keeping Plans and Specifications L Accessible". B Store Record Documents and Samples in field office if a field office is required by 7 Contract Documents, or in a secure location. Provide files,racks,and secure storage for Record Documents and Samples. 7 C Label each document"PROJECT RECORD"in neat, large,printed letters. D Maintain Record Documents in a clean,dry,and legible condition. Do not use Record 7 Documents for construction purposes. E Keep Record Documents and Samples available for inspection by Engineer. 7 1.05 RECORDING A Record information concurrently with construction progress. Do not conceal any work 7 until required information is recorded. B Plans, Change Orders, and Shop Drawings: Legibly mark each item to record all 7 actual construction, or"as built" conditions, including: 1. Measured horizontal locations and elevations of underground utilities and appurtenances,referenced to permanent surface improvements. 7 07/2006 01760- 1 of 2 7 CITY OF PEARLAND PROJECT RECORD DOCUMENTS 2. Elevations of underground utilities referenced to bench marks utilized for the Work. 3. Field changes of dimension and detail. J 4. Changes made by modifications. 5. Details not on original Plans. 6. References to related Shop Drawings and Modifications. C Record information with a red pen or pencil on a set of drawings indicated as the Record Document Set,provided by Engineer. 2.0 PRODUCTS - Not Used 3.0 EXECUTION A Deliver Record Documents and Samples to Owner in accordance with Section 01770— Contract Closeout. END OF SECTION 07/2006 01760-2 of 2 Ii CITY OF PEARLAND CONTRACT CLOSEOUT Section 01770 CONTRACT CLOSEOUT fl 1.0 GENERAL 1.01 SECTION INCLUDES A Closeout procedures including final submittals such as operation and maintenance data, warranties, and spare parts and maintenance materials. B References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01760—Project Record Documents 1.02 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1.03 CLOSEOUT PROCEDURES A Comply with Section 00700 — General Conditions of Agreement regarding Final Completion and Final Payment when Work is complete and ready for Engineer's final inspection. B Provide Record Documents under provisions of Section 01760 — Project Record Documents. C Complete or correct items on punch list,with no new items added. Any new items will be addressed during warranty period. D The Owner will occupy portions of the Work as specified in Section 00700—General Conditions of Agreement. E Contractor shall request Final Inspection at least two weeks prior to Final Acceptance. 1.04 FINAL CLEANING A Execute final cleaning prior to final inspection. B Clean debris from drainage systems. C Clean Project Site; sweep paved areas,rake clean landscaped surfaces. D Remove waste and surplus materials, rubbish, and temporary construction facilities from the Project Site following the final test of utilities and completion of the Work. 1.05 OPERATION AND MAINTENANCE DATA 02/2008 01770-1 of 2 1 1 i CITY OF PEARLAND CONTRACT CLOSEOUT A Submit Operations and Maintenance data under provisions of Section 01350 ,— Submittals. 1.06 WARRANTIES A Provide one original of each warranty from Subcontractors, Suppliers, and Manufacturers. Provide Table of Contents and assemble warranties in 3-ring/D binder with durable L' plastic cover. C Submit warranties prior to Final Application for Payment. 1. Warranties shall commence in accordance with the requirements of Section 00700—General Conditions of Agreement, 1.09 "Substantially Completed". 2.0 PRODUCTS - Not Used 3.0 EXECUTION Contractor shall diligently pursue completion of the items and activities contained in the Contract Close Out and Project Record Document sections of the project manual. Notwithstanding any performance of warranty work,the work of Contract Closeout shall be complete within thirty(30) days of the date of Final Completion and Acceptance of the work. END OF SECTION n E n 02/2008 01770-2 of 2 CITY OF PEARLAND . SITE PREPARATION Section 02200 SITE PREPARATION 1.0 GENERAL 1.01 SECTION INCLUDES A Removal of topsoil, stripping and stockpiling, clearing and grubbing. i � B Removal and disposal of waste materials, excess materials, debris and trash. C Removal of obstructions. D Excavation and fill. E Salvaging of designated item. F References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 01450—Testing Laboratory Services 4. Section 01500—Temporary Facilities and Controls 5. Section 02255—Bedding,Backfill and Embankment Material 6. Section 02330—Embankment 7. Section 01140—Contractor's Use of Premises G Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM D 4318, "Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils" 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item no separ ate ate payment will be made for Work performed under this Section. Include cost in Bid Items for which this Work is a component. L_ B If Site Preparation is included as a Bid Item,measurement will be based on the Units shown in Section 00300 — Bid Proposal and in accordance with Section 01200 - Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit embankment material sources and product quality information in accordance this Section. 07/2006 02200- 1 of 4 E CITY OF PEARLAND SITE PREPARATION 1.04 TESTING A Testing and analysis of product quality, material sources, or field quality shall be performed by an independent testing laboratory provided by the Owner under the provisions of Section 01450 —Testing Laboratory Services and as specified in this ''` Section. 1.05 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices described in Section 01500—Temporary Facilities and Controls. 2.0 PRODUCTS 2.01 MATERIALS A Contractor shall provide materials used as embedment, backfill, back-dressing, and embankment identified on the Plans in accordance with Section 02255 — Bedding, Backfill and Embankment Material. 3.0 EXECUTION 3.01 CLEARING AND GRUBBING. A Clear Project Site of trees,shrubs,and other vegetation,except for those designated by Owner to be left standing. B Use only hand methods for grubbing inside drip line of trees designated to remain. C Completely remove stumps,roots,and other debris protruding through ground surface. 1. On areas required for roadway, channel, or structural excavation, remove stumps, 2" diameter or larger limbs and roots, to depth of 2 feet below lower elevation of excavation. 2. On areas required for embankment construction, remove 2" diameter limbs, stumps and roots to depth of 2 feet below ground surface 3. Trees and stumps may be cut off as close to natural ground as practicable on areas which are to be covered by at least 3 feet of embankment D Fill depressions caused by clearing and grubbing operations with satisfactory soil material, unless further excavation or earthwork is indicated. 1. Place fill material in horizontal layers not exceeding 6 inches loose depth,and thoroughly compact to density equal to adjacent original ground. E Complete operations by bulldozing, blading,and grading so that prepared area is free of holes, unplanned ditches, abrupt changes in elevations and irregular contours, and preserve drainage of area. 1. Blade entire area to prevent ponding of water and to provide drainage,except in areas to be immediately excavated ►�9 07/2006 02200-2of4 C CITY OF PEARLAND SITE PREPARATION 7 3.02 TOPSOIL STRIPPING AND STOCKPILING 7 A Obtain approval of topsoil quality before excavating and stockpiling. B Excavate topsoil for esplanades and areas to receive grass or landscaping from areas to 7 be further excavated. C Topsoil Stripping: 7 1. Remove growths of grass from areas before stripping. 2. Topsoil is defined as surface soil found of depth of not less than 4 inches. 3. Strip topsoil to depths encountered. 7 4. Perform stripping in a manner to prevent intermingling of topsoil with underlying sterile subsoil and remove objectionable materials,including clay lumps, stones over 2 in.in diameter, weeds,roots, leaves, and debris. 7 5. Where trees are designated by Owner to be left standing,stop topsoil stripping at extreme limits of tree drip line to prevent damage to main root system. 7 D Topsoil Stockpiling: 1. Stockpile in areas designated on Plans. 2. Construct storage piles to freely drain surface water. ri 3. Cover storage piles,if required to prevent wind-blown dust. L 4. Stockpile topsoil to depth not exceeding 8 feet. Stockpile in a manner to prevent erosion. 7 3.03 UNSUITABLE MATERIAL A Undercut, remove, and replace material which Engineer designates as unsuitable for 7 subsequent construction. B Material used to replace unsuitable material shall be suitable material from site 7 excavation or as indicated on Plans. 3.04 EXCAVATION AND FILL CA Depressed site areas shall be filled using material from high areas, insofar as practicable. 7 B When fill obtained from high areas is exhausted, fill to indicated rough grade elevations under roadways with"Structural Fill"and open areas not under structures or roadways with"General Fill", or as indicated on Plans. 7 C Place and compact fill in accordance with Section 02330—Emb ankment. 7 3.05 SALVAGEABLE ITEMS AND MATERIAL A Items designated by Engineer to be salvaged are to be carefully removed,so as to cause 7 no damage to the salvaged items and delivered to Owner's storage yard. C07/2006 02200-3 of 4 7 1 CITY OF PEARLAND SITE PREPARATION 3.06 CLEAN-UP AND RESTORATION 7 A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. 7 END OF SECTION 1 1 1 1 1 1 1 1 1 1 1 71 1 07/2006 • 02200-4 of 4 7, I � CITY OF PEARLAND EMBANKMENT Section 02330 EMBANKMENT 1.0 GENERAL 7 1.01 SECTION INCLUDES A Construction of embankments with excess excavated material and borrow. B References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures �I 2. Section 01350—Submittals 3. Section 01760—Project Record Documents 4. Section 01570—Trench Safety System 5. Section 01450—Testing Laboratory Services 6. Section 01500—Temporary Facilities and Controls 7. Section 02255—Bedding, Backfill and Embankment Material 8. Section 02910—Topsoil 9. Section 01564—Control of Ground Water and Surface Water 10. Section 01720—Field Surveying 11. Section 02220—Site Demolition 12. Section 02200—Site Preparation 13. Section 01140—Contractor's Use of Premises C Referenced Standards: 1. American Water Works Association (AWWA) a•.l a. ASTM D 698, "Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort" b. ASTM D 1556,"Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method" c. ASTM D 2922, "Standard Test Method for Density of Soil and Soil- Aggregate in Place by Nuclear Methods (Shallow Depth)" d. ASTM D 3017, "Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth)" 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item, no separate payment will be made for Embankment under this Section. Include cost in Bid Items for which this Work is a component. B If embankment is included as a Bid Item, measurement will be based on the Units shown in Section 00300 — Bid Proposal and in accordance with Section 01200 — Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 07/2006 02330-1 of 5 7 _ CITY OF PEARLAND EMBANKMENT L B Submit product quality,material sources,and 'field quality information in accordance with this Section. 1� C a Submit field red lines documenting location of embankment's nkments as installed,referenced to survey Control Points, under the provisions of Section 01760 — Project Record Documents, 1.04C. Include location of utilities and structures encountered or rerouted. Give horizontal dimensions, elevations, inverts and gradients. D . Submit a Trench Safety Plan under the provisions of Section 01570—Trench Safety System that included measures that establish compliance with the standard interpretation of the General Duty Clause,Section 5.(a)(1),of the Occupational Safety and Health Act of 1970 _20 USC 654 which.states, "Employers must shore or otherwise protect employees who walk/work at the base of an emb possible collapse." anlanent from 1.04 TESTING A Testing and analysis of product quality, material sources, or field quality shall be performed by an independent testing laboratory provided by the Owner under the provisions of Section 01450 —Testing Laboratory Services and as specified in this Section. 1.05 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices described in Section 01500,—Temporary Facilities and Controls. . 2.0 PRODUCTS 2.01 . MATERIALS A Contractor shall provide materials is used as embedment, backfill, back-dressing, and embankment identified on the Plans in accordance with Section 02255 —Bedding, Backfill and Embankment Material. B Topsoil: Conform to requirements of Section 02910—Topsoil. C Borrow Material: Conform to requirements of intended use. Take borrow material from sources approved by Engineer. 3.0 EXECUTION 3.01 EXAMINATION . A ' Verify borrow and excess excavated materials to be reus ed, are approved. B Verify removals, and clearing and grubbing operations,have been completed. 07/2006 02330-2 of 5 CITY OF PEARLAND EMBANKMENT a-, C Verify backfill of new or relocated utilities and structures, below future grade, is J' complete. PREPARATION 13.02 A Employ a Trench Safety Plan as specified in Section 01570—Trench Safety Systems. B Install and operate necessary dewatering and surface water control measures in accordance with requirements of Section 01564 — Control of Ground Water and Surface Water. C Identify required lines, levels, and datum. Coordinate with Section 01720 —Field !- Surveying. D Remove existing pavements and structures, including sidewalks and driveways, in conformance with requirements of Section 02220—Site Demolition, as applicable. E Area shall be cleared and grubbed under the provisions of Section 02200 — Site Preparation prior to placing embankment or opening borrow source. F Strip and stockpile topsoil under the provisions of Section 02200—Site Preparation. G Backfill test pits, or stump holes and other surface irregularities such as small swales • with embankment materials and compact in proper lift depths according to the compaction requirements of this Section. fl H Areas of unsuitable material shall be removed, backfilled with embankment materials and compacted in proper lift depths according to the compaction requirements of this Section. • I Upon discovery of unknown or badly deteriorated utilities, or concealed conditions, ►n discontinue work. Notify Engineer and obtain instructions before proceeding in such areas. 3.03 PLACEMENT AND COMPACTION i A Do not conduct placement operations during inclement weather or when existing ground or embankment materials exceed 3 percent of optimum moisture content. '.. Contractor may manipulate wet material to facilitated drying,by disking or windrowing, at Contractor's expense. B Do not place embankment material until density and moisture content of previously placed material complies with specified requirements. C Scarify areas to receive embankment to a minimum depth of 4 inches to bond existing and new materials. Mix with first layer of embankment material. D Spread embankment material evenly,from dumped piles or windrows,into horizontal layers approximately parallel to finished grade. Place to meet specified compacted 07/2006. 02330-3of5 I 7- CITY OF PEARLAND EMBANKMENT re thickness. Break clods and lumps and mix materials by blading,harrowing,discing,or , 7other approved method. Each layer shall extend across full width of embankment. E Each layer shall be homogeneous and contain uniform moisture content before compaction. Mix dissimilar abutting materials to prevent abrupt changes in L composition of embankment. F Layers shall not exceed depth as indicated on the Plans. 7 G Where shown on Plans for steepslopes, cut benches sinto slope and scarify before placing embankment. Place increasingly wide horizontal layers of specified depth,to 7 the level of each bench. H Build embankment layers on back slopes,adjacent to existing roadbeds,to level of old 7 roadbed. Scarify top of old roadbed to minimum depth of four inches and re-compact with next layer. I Construct to lines and grades shown on Plans. 7 3.04 COMPACTIO N REQUIREMENTS rA Maintain moisture content of embankment materials to attain required compaction density. 7 B Compact to minimum densities shown on the Plans with a moisture content of optimum to 3 percent above optimum as determined by ASTM D 698. 3.05 TOLERANCES 7 I A Top of compacted surface:Plus or minus'h inch in cross section,or in 16 foo t 7 3.06 FIELD QUALITY CONTROL A Compaction testing will be performed in accordance with ASTM D 1556 or ASTM D 7 2922 and ASTM D 3017 under provisions of Section 01450 — Testing Laboratory Services. C B A minimum of three tests will be taken for each 1,000 linear feet per lane of roadway or 500 square yards of embankment per lift. 7, C If tests indicate work does not meet specified compaction requirements,recondition, Ire-compact, and retest at Contractor's expense. 3.07 CLEAN-UP AND RESTORATION 7 A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. 7 B In unpaved areas, grade surface as a uniform slope from installed appurtenances to natural grade and stabilize as indicated on Plans. 7 07/2006 02330-4 of 5 r CITY OF PEARLAND EMBANKMENT 3.08 PROTECTION OF THE WORK A Maintain all embankment areas in good condition until completion of Work. �1 B Repair and re-compact slides, washouts, settlements, areas with loss of density, or excavation damaged by Contractor's operations at no additional cost to Owner. C Distribute construction traffic evenly over compacted areas,where practical,to aid in obtaining uniform compaction. Protect exposed areas having high moisture content from wheel loads that cause rutting. END OF SECTION 1 1 7 1 1 1 7 1 7 07/2006 02330-5 of 5 7 CITY OF PEARLAND EXCAVATION AND BACKFILL FOR UTILITIES Section 02318 EXCAVATION AND BACKFILL FOR UTILITIES 1.0 GENERAL 1.01 SECTION INCLUDES A Excavation, trenching, foundation, embedment, and backfill manholes and other pipeline structures. 1 for installation of utilities, B References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 01570—Trench Safety System 4. Section 01564—Control of Ground Water and Surface Water 5. Section 01760—Project Record Documents 6. Section 01450—Testing Laboratory Services 7. Section 01500—Temporary Facilities and Controls 8. Section 02255—Bedding, Backfill, and Embankment Materials 9. Section 02370—Geotextile 10. Section 02220—Site Demolition 11. Section 01140—Contractor's Use of Premises C Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM D 2321, "Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications" b. ASTM D 698, "Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort" c. ASTM D 558, "Standard Test Methods for Moisture-Density (Unit Weight)Relations of Soil-Cement Mixtures" d. ASTM D 4318, "Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils" e. ASTM D 1556,"Standard Test Method for Density and Unit Weight of fl Soil in Place by the Sand-Cone Method" f. ASTM D 2922, "Standard Test Method for Density of Soil and Soil- Aggregate in Place by Nuclear Methods (Shallow Depth)" g. ASTM D 3017, "Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth)" 2. Texas Department of Transportation (TxDOT) a. Tex-101-E, Preparing Soil and Flexible Base Materials for Testing b. Tex-110-E, Particle Size Analysis of Soils D Definitions: 1. Excavation - Any man-made cut, cavity, trench, or depression in an earth surface, formed by removal of material. 07/2006 02318-1 of 13 7 7 CITY OF PEARLAND EXCAVATION AND BACKFILL FOR UTILITIES 71 a. Extra Hand Excavation- excavation by manual labor at locations 7 , designated by the Engineer, which is not included in other Bid Items. b. Extra Machine Excavation- excavation by machine at locations in by th Engir, which not i ot . 7 c. Specdesgial E atedxcavatione -excavationnee h necessitatedciso by obstructionincludednherBid of Itemspipes, ducts, or other structures, not shown on Plans, which interfere with installation of utility piping by normal methods of excavation or augering. Contractor shall be responsible for locating such 7 underground obstructions,sufficiently in advance of trench excavation or augering, to preclude damage to the obstructions. 7 2. Pipe Foundation-suitable and stable native soils that are exposed at the trench subgrade after excavation to depth of bottom of the bedding as shown on the Plans, or foundation backfill material placed and compacted in over- excavations. 3. Pipe Bedding-the portion of trench backfill that extends vertically from top of foundation up to a level line at bottom of pipe, and horizontally from one FI': trench sidewall to opposite sidewall. 4. Haunching-the material placed on either side of pipe from top of bedding up to spring-line of pipe and horizontally from one trench sidewall to opposite C sidewall. 5. Initial Backfill - the portion of trench backfill that extends vertically from spring-line of pipe(top of haunching)up to a level line 12 inches above top of 7 pipe, and horizontally from one trench sidewall to opposite sidewall. 6. Pipe Embedment - the portion of trench backfill that consists of bedding, haunching, and initial backfill. 7 7. Trench Zone-the portion of trench backfill that extends vertically from top of pipe embedment up to pavement subgrade or up to final grade when not beneath pavement. 7 8. Trench Conditions - description of the stability of trench bottom and trench walls of pipe embedment zone: Maintain trench conditions that provide for effective placement and compaction of embedment material directly on or C against undisturbed soils or foundation backfill,except where structural trench support is necessary. a. Dry Stable Trench: Stable and substantially dry trench conditions exist 7 in pipe embedment zone as a result of typically dry soils or achieved by ground water control (dewatering or depressurization) for trenches extending below ground water level. 7 b. Stable Trench with Seepage: Stable trench in which ground water seepage is controlled by excavation drainage. 1) Stable Trench with Seepage in Clayey Soils: Excavation 7 drainage is provided in lieu of or to supplement ground water control systems to control seepage and provide stable trench subgrade in predominately clayey soils prior to 7 bedding placement. 7 07/2006 02318-2 of 13 7 CITY OF PEARLAND EXCAVATION AND BACKFILL 7 FOR UTILITIES 2) Stable Wet Trench in Sandy Soils: Excavation drainage is provided in the embedment zone in combination with ground water control in predominately sandy or silty soils. c. Unstable Trench: Unstable trench conditions exist in the pipe embedment zone if ground water inflow or high water content causes soil disturbances, such as sloughing,sliding,boiling,heaving or loss of density. 9. Sub-trench - a special case of benched excavation. Sub-trench excavation below trench shields or shoring installations may be used to allow placement and compaction of foundation or embedment materials directly against fl undisturbed soils. Depth of a sub-trench depends upon trench stability and safety as determined by the Contractor. 10. Trench Dam - a placement of low permeability material in pipe embedment zone or foundation to prohibit ground water flow along the trench. 11. Over-Excavation and Backfill - excavation of subgrade soils with unsatisfactory bearing capacity or composed of otherwise unsuitable materials 7 below top of foundation as shown on Plans, and backfilled with foundation backfill material. 12. Foundation Backfill Materials - natural soil or manufactured aggregate of controlled gradation, and geo-textile filter fabrics as required, to control drainage and material separation. Foundation backfill material is placed and compacted as backfill to provide stable support for bedding. Foundation 'l backfill materials may include concrete seal slabs. 13. Trench Shield(Trench Box)-a portable worker safety structure moved along the trench as work proceeds, used as a Protective System and designed to withstand forces imposed on it by cave-in, thereby protecting persons within the trench. Trench shields may be stacked if so designed or placed in a series depending on depth and length of excavation to be protected. 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item, no separate payment will be made for trench excavation, 1 1 embedment, and backfill under this Section. Include cost in Bid Items for installed underground piping, sewer, conduit, or duct work. B If Special Excavation is allowed, based on the Engineer's direction, and indicated in Section 00300—Bid Proposal as an Extra Item,measurement will be on a cubic yard basis, measured in place, without deduction for space occupied by portions of pipes, ducts, or other structures left in place across trenches excavated under this item. 1. Payment for Special Excavation shall include: a. Dewatering and surface water control. b. Protection of pipes, ducts, or other structures encountered including bracing, shoring, and sheeting necessary for support. c. Replacement of pipes, ducts, or structures damaged by special excavation operations, except where payment for replacement isI' authorized by Engineer due to deteriorated condition of pipes,ducts,or structure. 7 07/2006 02318-3of13 7 CITY OF PEARLAND EXCAVATION AND BACKFILL 7 FOR UTILITIES d. Temporary disconnecting,plugging, and reconnecting of low volume 7 water pipes,to allow machine excavation or augering,when approved by Engineer. Pipe for replacement shall be new and conform to specification requirements for type of existing pipe removed. 7 e. Placement of material from Special Excavation. f. Geo-textile material and concrete trench dams required to complete the C g. placement of material from Special Excavation. Re-sodding required for surface restoration within designated limits of Special Excavation. h. Disposal of excess excavated material not suitable for bedding or 7 backfill, or not required for the Work. 2. The items listed below will not be included in payment for Special Excavation. Include cost in Bid Items for which the Work is a component: 7 a. Trench safety system including sheeting and shoring. b. Utility piping installed in trenches excavated under this item. c. Removal and replacement of associated streets, driveways, and 7 sidewalks. C If Extra.Hand Excavation is allowed, based on the Engineer's direction, and indicated in 7 Section 00300—Bid Proposal as an Extra Item,measurement will be on a cubic yard basis, measured in place. 7 1. Payment for Extra Hand Excavation shall include: a. Dewatering and surface water control. b. Disposal of excess excavated material not suitable for bedding or backfill, or not required for the Work. 7 c. Placement of material from Extra Hand Excavation. d. Re-sodding required for surface restoration within designated limits of Extra Hand Excavation. 7 2. The items listed below will not be included in payment for Special Excavation. Include cost in Bid Items for which the Work is a component.: a. Trench safety system including sheeting and shoring. 7 b. Removal and replacement of associated streets, driveways, and sidewalks. D If Extra Machine Excavation is allowed,based on the Engineer's direction,and indicated in Section 00300—Bid Proposal as an Extra Item,measurement will be on a cubic yard basis, 7. measured in place. 1. Payment for Extra Machine Excavation shall include: r! a. Dewatering and surface water control. b. Disposal of excess excavated material not suitable for bedding or backfill, or not required for the Work. 7 c. Placement of material from extra machine excavation. d. Re-sodding required for surface restoration within designated limits of Extra Machine Excavation. 7 2. The items listed below will not be included in payment for Special Excavation. Include cost in Bid Items for which the Work is a component: a. Trench safety system including sheeting and shoring. 7 07/2006 02318-4 of 13 7 CITY OF PEARLAND EXCAVATION AND BACKFILL 7 FOR UTILITIES b. Removal and replacement of associated streets, driveways, and sidewalks. E Refer to Section 01200-Measurement and Payment Procedures. No payment will be made for delays in completion of Work resulting from Extra Item Work. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit a written description for information only of the planned typical method of excavation, backfill placement and compaction, including: 1. Sequence of work and coordination of activities. 2. Selected trench widths. 3. Procedures for foundation and embedment placement, and compaction. 4. Procedure for use of trench boxes and other pre-manufactured systems while assuring specified compaction against undisturbed soil. 5. Procedure for installation of Special Shoring at locations identified on the Plans. C Submit product quality,material sources,and field quality information in accordance with this Section. D Submit field red lines documenting location of Utilities as installed, referenced to survey Control Points,under the provisions of Section 01760—Project Record Documents, 1.04C. Include location of utilities and structures encountered or rerouted. Give horizontal , dimensions, elevations, inverts and gradients. 1.04 TESTING 'i 1 A Testing and analysis of product quality,material sources,or field quality shall be performed by an independent testing laboratory provided by the Owner under the provisions of Section 01450—Testing Laboratory Services and as specified in this Section. 1.05 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices described in Section 01500—Temporary Facilities and Controls. fl 1.06 SPECIAL SHORING DESIGN REQUIREMENTS A Special Shoring shall be, in accordance with Section 01570 — Trench Safety System, designed by a Professional Engineer, licensed by the State of Texas, At Contractor's expense. B Special Shoring shall be designed to provide support for the sides of the excavations, including soils and hydrostatic ground water pressures as applicable,and to prevent ground 07/2006 02318-5 of 13 l CITY OF PEARLAND EXCAVATION AND BACKFILL FOR UTILITIES movements affecting adjacent installations or improvements such as structures,pavements and utilities. C Special Shoring may be a pre-manufactured system or a field fabricated system that meets the requirements of the Work. 2.0 PRODUCTS 2.01 MATERIALS A Contractor shall provide materials used as embedment, backfill, back-dressing, and embankment identified on the Plans in accordance with Section 02255—Bedding,Backfill and Embankment Material. B Manufactured materials, such as crushed concrete, may be substituted for natural soil or rock products where indicated in the product specification,and approved by the Engineer, i th thephysicalproperty criteria are determined to be satisfactory by testing. C Geotextilprovded et (atFilter Fabriphc): Conform to requirements of Section 02370—Geotextile. D Concrete for Trench Dams: Concrete backfill or 3 sack premixed(bag)concrete. E Timber Shoring Left in Place: Untreated oak. 2.02 EQUIPMENT A Perform excavation with track mounted excavator or other equipment suitable for achieving the requirements of this Section. B Use only hand-operated tamping equipment until a minimum cover of 12 inches is obtained over pipes, conduits, and ducts. Do not use heavy compacting equipment until adequate cover is attained to prevent damage to pipes, conduits, or ducts. C Use trench shields or other Protective Systems or Shoring Systems which are designed and operated to achieve placement and compaction of backfill directly against undisturbed native soil. D Use Special Shoring systems where required which may consist of braced sheeting,braced soldier piles and lagging, slide rail systems, or other systems meeting the Special Shoringdesign requirements. 3.0 EXECUTION 3.01 PREPARATION A Employ a Trench Safety Program as specified in Section 01570—Trench Safety Systems. B Install and operate necessary dewateringand surface water control measures conform to Section 01564-Control of Ground Water and Surface Water. 07/2006 02318-6of13 E . r CITY OF PEARLAND EXCAVATION AND BACKFILL FOR UTILITIES C Remove existing pavements and structures,including sidewalks and driveways,to conform with requirements of Section 02220—Site Demolition, as applicable. D Area shall be cleared and grubbed under the provisions of Section 02200—Site Preparation prior to excavation. E Strip and stockpile topsoil under the provisions of Section 02200—Site Preparation 7 F Schedule work so that pipe embedment can be completed on the same day that acceptable foundation has been achieved for each section of pipe installation, manhole, or other structures. 3.02 EXCAVATION A Except as otherwise specified or shown on the Plans,install underground utilities in open cut trenches with vertical sides. B Perform excavation work so that pipe, conduit, and ducts can be installed to depths and alignments shown on the Plans. Avoid disturbing surrounding ground and existing facilities and improvements. "y C Determine trench excavation widths using the following schedule as related to pipe outside 1 diameter (O.D.). Maximum trench width shall be the minimum trench width plus 24 inches. 5 NOMINAL MINIMUM TRENCH 7 PIPE SIZE,INCHES WIDTH,INCHES Less than 18 O.D. + 18 18to30 O.D. +24 7 Greater than 30 O.D. +36 D Use sufficient trench width or benches above the embedment zone for installation of well point headers or manifolds and pumps where depth of trench makes it uneconomical or impractical to pump from the surface elevation. Provide sufficient space between shoring cross braces to permit equipment operations and handling of forms,pipe, embedment and "1 backfill, and other materials. E Upon discovery of unknown utilities,badly deteriorated utilities not designated for removal, "I or concealed conditions,discontinue work at that location. Notify the Engineer and obtain instructions before proceeding. F Shoring of Trench Walls. 1. Install Special Shoring in advance of trench excavation or simultaneously with the trench excavation, so that the soils within the full height of the trench excavation walls will remain fully laterally supported at all times. 1 07/2006 1 02318-7 of 13 J CITY OF PEARLAND EXCAVATION AND BACKFILL FOR UTILITIES 2. For all types of shoring, support trench walls in the pipe embedment zone throughout the installation. Provide trench wall supports sufficiently tight to prevent washing the trench wall soil out from behind the trench wall support. 3. Unless otherwise directed by the Engineer,leave sheeting driven into or below the pipe embedment zone in place to preclude loss of support of foundation and embedment materials. Leave rangers, walers, and braces in place as long as required to support sheeting,which has been cut off,and the trench wall in the vicinity of the pipe zone. 4. Employ special methods for maintaining the integrity of embedment or foundation material. Before moving supports,place and compact embedment to sufficient depths to provide protection of pipe and stability of trench walls. As supports are moved,finish placing and compacting embedment. 5. If sheeting or.other shoring is used below top of the pipe embedment zone,do not disturb pipe foundation and embedment materials by subsequent removal. Maximum thickness of removable sheeting extending into the embedment zone 1 inch. Fill voids left on removal of supports with compacted backfill material. G Use of Trench Shields. When a trench shield(tr ench nch box)is used as a worker safety device, the following requirements apply: 1. Make trench excavations of sufficient width to allow shield to be lifted or pulled freely,without damage to the trench sidewalls. 2. Move trench shields so that pipe,and backfill materials, after placement and compaction, are not damaged nor disturbed, nor the degree of compaction reduced. 3. When required, place, spread, and compact pipe foundation and bedding materials beneath the shield. For backfill above bedding,move the shield as backfill is placed and ramped in. Place and compact backfill materials against undisturbed trench walls and foundation. 4. Maintain trench shield in position to allow sampling and testing to be performed in a safe manner. 3.03 TRENCH FOUNDATION A Excav ate bottom of trench to uniform grade to achieve stable trench conditions and satisfactory compaction of foundation or bedding materials. B Place trench dams in Class I foundations in line segments longer than 100 feet between manholes,and not less than one in every 500 feet of pipe placed. Install additional dams as needed to achieve workable construction conditions. Do not place trench dams closer than f 5 feet from manholes. 3.04 PIPE EMBEDMENT PLACEMENT AND COMPACTION A Immediately prior to placement of embedment materials, the bottoms and sidewalls of trenches shall be free of loose, sloughing, caving, or otherwise unsuitable soil. 07/2006 02318- 8of13 E CITY OF PEARLAND EXCAVATION AND BACKFILL FOR UTILITIES B Place Geotextile, if specified, to prevent particle migration from the in-situ into open- graded(Class I) embedment materials or drainage layers. C Place embedment including bedding,haunching and initial backfill to meet requirements indicated on Plans. PVC&HDPE require cement stabilized sand bedding and backfill to one foot below subgrade or below grade if under pavement,or one foot above top of pipe if not under pavement. D For pipe installation, manually spread embedment materials around the pipe to provide uniform bearing and side support when compacted. Do not allow materials to free-fall from "" heights greater than 24 inches above top of pipe. Perform placement and compaction directly against the undisturbed soils in the trench sidewalls,or against sheeting which is to remain in place. E Do not place trench shields or shoring within height of the embedment zone unless means to maintain the density of compacted embedment material are used. If moveable supports are used in embedment zone, lift the supports incrementally to allow placement and compaction of the material against undisturbed soil. F Do not damage coatings or wrappings of pipes during backfilling and compacting 1 operations. When embedding coated or wrapped pipes, do not use crushed stone or other sharp, angular aggregates. G Place haunching material manually around the pipe and compact it to provide uniform bearing and side support. If necessary, hold small-diameter or lightweight pipe in place during compaction of haunch areas and placement beside the pipe with sand bags or other suitable means. H Place electrical conduit directly on foundation without bedding. Shovel pipe embedment material in place and compact p it using pneumatic tampers in restricted spaces, and vibratory-plate compactors or engine-powered jumping jacks in unrestricted spaces. Compact each lift before proceeding with placement of the next lift. 1. Class I embedment materials. a. Maximum 6-inches compacted lift thickness. b. Systematic compaction by at least two passes of vibrating equipment. Increase compaction effort as necessary to effectively embed the pipe to meet the deflection test criteria. c. Moisture content as determined by Contractor for effective compaction without softening the soil of trench bottom,foundation or trench walls. 2. Class II embedment and cement stabilized sand. a. Maximum 6-inches compacted thickness. b. Compaction by methods determined by Contractor to achieve a minimum of 95 percent of the maximum dry density as determined according to ASTM D 698 for Class II materials and according to ASTM D 558 for cement stabilized materials. 07/2006 02318-9 of 13 CITY OF PEARLAND EXCAVATION AND BACKFILL FOR UTILITIES c. Moisture content of Class II materials within 3 percent of optimum as determined according to ASTM D 698. Moisture content of cement stabilized sands on the dry side of optimum as determined according to ASTM D 558 but sufficient for effective hydration. J Place trench dams in Class I embedments in line segments longer than 100 feet between manholes,and not less than one in every 500 feet of pipe placed. Install additional dams as needed to achieve workable construction conditions. Do not place trench dams closer than 5 feet from manholes. 3.05 TRENCH ZONE BACKFILL PLACEMENT AND COMPACTION A Place backfill for pipe or conduits and restore surface as soon as practicable. Leave only the minimum length of trench open as necessary for construction. B Where damage to completed pipe installation work is likely to result from withdrawal of sheeting,leave the sheeting in place. Cut off sheeting 1.5 feet or more above the crown of the pipe. Remove trench supports within 5 feet from the ground surface. C For sewer pipes, use backfill materials described here as determined by trench limits.As trench zone backfill in paved areas for streets and to one foot back of curbs and pavements, use cement stabilized sand for pipe of nominal sizes less than 36 inches,or Bank Sand for pipe of nominal sizes 36 inches and larger as indicated on the Drawings. Uniformly backfill trenches unless specified otherwise according to the paved area criteria. Use select backfill within one foot below pavement subgrade for rigid pavement. For asphalt concrete, use flexible base material within one foot below pavement subgrade. D For water lines backfill in tre nch zone,including auger pits,with Bank Sand,Select Fill,or Random Fill material as specified in this Section. E For trench excavations under pavement,place trench zone ne backfill in lifts and compact by methods indicated below. Fully compact each lift before placement of the next lift. 1. Bank Sand. a. Maximum 9-inches compacted lift thickness.b. Compaction by vibratory equipment to a minimum of 95 percent of the maximum dry density determined according to ASTM D 698. c. Moisture content within 3 percent of optimum determined according to ASTM D 698 2. Cement Stabilized Sand. a. Maximum lift thickness determined by Contractor to achieve uniform placement and required compaction, but not exceeding 24 inches. b. Compaction by vibratory equipment to a minimum of 95 percent of the maximum dry density determined according to ASTM D 558. c. Moisture content on the dry side of optimum determined according to 3. Select ASTMFill. D 558 but sufficient for cement hydration. [� a. Maximum 6-inches compacted thickness. 07/2006 02318-10 of 13 ti CITY OF PEARLAND EXCAVATION AND BACKFILL FOR UTILITIES b. Compaction by equipment providing tamping or kneading impact to a minimum of 95 percent of the maximum dry density determined according to ASTM D 698. c. Moisture content within 2 percent of optimum determined according to ASTM D 698. F For trench excavations outside pavements,a Random Fill of suitable material may be used in the trench zone. 1. Fat clays (CH)may be used as trench zone backfill outside paved areas at the Contractor's option. If the required density is not achieved,the Contractor,at T his option and at no additional cost to the Owner,may use lime stabilization to achieve compaction requirements or use a different suitable material. 2. Maximum 9-inch compacted lift thickness for clayey soils and maximum 12- `� inch lift thickness for granular soils. I 3. Compact to a minimum of 90 percent of the maximum dry density determined according to ASTM D 698, or to same density as adjacent soils. 4. Moisture content as necessary to achieve density. 3.06 MANHOLES,JUNCTION BOXES AND OTHER PIPELINE STRUCTURES A Meet the requirements of adjoining utility installations for imol ll of pipeline structures,as shown on the Plans. 3.07 FIELD QUALITY CONTROL A Quality Control 1. The Engineer may sample and test backfill at: a. Sources including borrow pits, production plants and Contractor's designated off-site stockpiles. b. On-site stockpiles. c. Materials placed in the Work. 2. The Engineer may resample material at any stage of work or location if changes in characteristics are apparent. B Production Verification Testing: The Owner's testing laboratory will provide verification testing on backfill materials, as directed by the Engineer. Samples may be taken at the 71 source or at the production plant, as applicable. C Provide excavation and Trench Safety Systems at locations and to depths required for testing and retesting during construction. D Tests will be performed on a minimum of three different samples of each material type for plasticity characteristics, in accordance with ASTM D 4318, and for gradation characteristics, in accordance with Tex-101-E and Tex-110-E. Additional classification ^y tests will be performed whenever there is a noticeable change in material gradation or plasticity. 07/2006 1 02318-11of13 ^'t CITY OF PEARLAND EXCAVATION AND BACKFILL FOR UTILITIES At least three tests for moisture-density relationships will be performed initially for backfill materials in accordance with ASTM D 698, and for cement stabilized sand in accordance with ASTM D 558. Additional moisture-density relationship tests will be performed whenever there is a noticeable change in material gradation or plasticity. F In-place density tests of compacted pipe foundation, embedment and trench zone backfill soil materials will be performed according to ASTM D 1556,or ASTM D 2922 and ASTM D 3017, and at the following frequencies and conditions. 1. A minimum of one test for every 20 cubic yards of compacted embedment and for every 50 cubic yards of compacted trench zone backfill material. 2. A minimum of three density tests for each full shift of Work when backfill is placed. 3. Density tests will be distributed among the placement areas. Placement areas are: foundation, bedding,haunching,initial backfill and trench zone. 4. The number of tests will be increased if inspection determines that soil type or moisture content are not uniform or if compacting effort is variable and not considered sufficient to attain uniform density, as specified. 5. Density tests may be performed at various depths below the fill surface by pit excavation. Material in previously placed lifts may therefore be subject to acceptance/rejection. 6. Two verification tests will be performed adjacent to in-place tests showing density less than the acceptance criteria. Placement will be rejected unless both verification tests show acceptable results. 7. Re-compacted placement will be retested at the same frequency as the first test series,including verification tests. LG Recondition,re-compact,and retest at Contractor's expense if tests indicate Work does not meet specified compaction requirements. For Cement Stabilized Sand with nonconforming density, core and test for compressive strength at Contractor's expense. H Acceptability of crushed rock compaction will be determined by inspection. 3.08 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. 3.09 PROTECTION OF THE WORK A Maintain excavation and embankment areas until start of subsequent work. Repair and re- compact slides,washouts,settlements,or areas with loss of density at no cost to the Owner B Prevent erosion at all times. Do not allow water to pond in excavations. C Distribute construction traffic evenly over compacted areas, where practical, to aid in obtaining uniform compaction. Protect exposed areas having high moisture content from wheel loads that cause rutting. 07/2006 02318-12of13 E CITY OF PEARLAND EXCAVATION AND BACKFILL 7, FOR UTILITIES END OF SECTION 7 T 7 ) 7 7 07/2006 02318-13of13 it CITY OF PEARLAND EXCAVATION AND BACKFILL FOR STRUCTURES Section 02317 EXCAVATION AND BACKFILL FOR STRUCTURES 1.0 GENERAL 1.01 SECTION INCLUDES A Excavation, backfilling, and compaction of backfill for structures. B References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350 -Submittals 3. Section 01760—Project Record Documents 4. Section 01450 -Testing Laboratory Services 5. Section 01500—Temporary Facilities and Controls 6. Section 02255—Bedding, Backfill, and Embankment Materials 7 7. Section 01570-Trench Safety System 8. Section 01564- Control of Ground Water and Surface Water 9. Section 02220 -Site Demolition 10. Section 02200—Site Preparation 11. Section 02252 - Cement Stabilized Sand 12. Section 01562-Waste Material Disposal 1 C Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM D 698, "Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort" b. ASTM D 4318, "Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils" c. ASTM D 1556,"Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method" 1-1 d. ASTM D 2922, "Standard Test Method for Density of Soil and Soil- Aggregate in Place by Nuclear Methods (Shallow Depth)" e. ASTM D 3017, "Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth)" 2. Occupational Safety and Health Administration (OSHA) 3. Texas Department of Transportation (TxDOT) a. Tex-101-E, Preparing Soil and Flexible Base Materials for Testing b. Tex-110-E, Particle Size Analysis of Soils D Definitions: 1. Backfill - material meeting specified quality requirements, placed and compacted under controlled conditions around pavements, structures and utilities. 07/2006 T 02317- 1 of 7 7 CITY OF PEARLAND EXCAVATION AND BACKFILL FOR STRUCTURES 2. Foundation Backfill-natural soil or manufactured aggregate meeting Class I requirements and Geotextile fabrics as required to control drainage and material separation placed and compacted where needed to provide stable support for the structure foundation base. Foundation backfill may include 7: crushed aggregate with filter fabric as required, cement stabilized sand, or concrete seal slab. 3. Foundation Base - provides a smooth, level working surface for the construction of the concrete foundation. 4. Foundation Subgrade-the surface of the natural soil which has been excavated and prepared to support the foundation base or foundation backfill, where needed. 5. Over-Excavation - excavation of subgrade soils with unsatisfactory capacity or composed of otherwise unsuitable materials below the foundation as shown on the Plans. 1.02 MEASUREMEN T AND PAYMENT UNIT PRICES A. Unless indicated as a Bid Item,no separate payment will be made for Excavation and Backfill for Structures under this Section. Include cost in Bid Items for construction rof structures. 4� B If Excavation and Backfill for Structures is included as a Bid Item,measurement will be based on the Units shown in Section 00300—Bid Proposal and in accordance with Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS A . Make Submittals required by this Section under the provisions of Section - Submittals. 01350 B Submit for each structure a work plan for excavation and backfill with a complete written description whic h ich identifies details of the proposed method of construction and the sequence of operations for construction relative to excavation and backfill activities. The descriptions, with supporting illustrations, shall be sufficiently detailed to demonstrate to the Engineer that the procedures meet the requirements of the Plans and Technical Specifications. C Submit product quality,material sources,and field quali ty iry information in accordance with this Section. D Submit field red lines documenting _ location of structures as installed,referenced to survey Control Points, under the provisions of Section-01760 — Project Record Documents, 1.04C. Include location of utilities and structures encountered or rerouted. Give horizontal dimensions, elevations,inverts and gradients. 07/2006 02317-2of7 CITY OF PEARLAND EXCAVATION AND BACKFILL _ FOR STRUCTURES - I 1.04 TESTING 7 A Testing and analysis of product quality, material sources, or field quality shall be performed by an independent testing laboratory provided by the Owner under the provisions of Section 01450 -Testing Laboratory Services and as specified in this _ Section. 1.05 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices described in Section 01500 - Temporary Facilities and Controls. 1 2.0 PRODUCTS 2.01 MATERIALS A Contractor shall provide materials used as embedment, backfill,back-dressing,and - embankment identified on the Plans in accordance with Section 02255—Bedding, Backfill and Embankment Material. 2.02 EQUIPMENT A Perform excavation with equipment suitable for achieving the requirements of this Section. I- B Use equipment which will produce the degree of compaction specified. Backfill within 3 feet of walls shall be compacted with hand operated equipment. Do not use equipment weighing more than 10,000 pounds closer to walls than a horizontal distance equal to the depth of the fill at that time. Use hand operated power compaction equipment where use of heavier equipment is impractical or restricted rj due to weight limitations. 3.0 EXECUTION 7 3.01 PREPARATION A Employ a Trench Safety Plan as specified in Section 01570-Trench Safety Systems. B Install and operate necessary dewatering and surface water control measures in accordance with requirements of Section 01564 - Control of Ground Water and Surface Water. C Remove existing pavements and structures, including sidewalks and driveways,in accordance with requirements of Section 02220 -Site Demolition, as applicable. D Area shall be cleared and grubbed under the provisions of Section 02200 - Site Preparation prior to excavation. 07/2006 02317-3 of 7 7 i -- IL _ CITY OF PEARLAND EXCAVATION AND BACKFILL 7 FOR STRUCTURES E Strip and stockpile topsoil under the provisions of Section 02200-Site Preparation. F Upon discovery of unknown utilities, badly deteriorated utilities not designated for 7 removal, or concealed conditions, discontinue work. Notify Engineer and obtain instructions before proceeding in such areas. rm. 3.02 EXCAVATION 7 A Perform excavation work so that the underground structure can be installed to depths andgnments shown on Plans D alignments rawrngs. Use caution during excavation work to avoid disturbing surrounding ground and existing facilities and improvements. Keep 7 excavation to the absolute minimum necessary. No additional payment will be made for excess excavation not authorized by Engineer. 7 B Avoid settlement of surrounding soil due to equipment operations, excavation procedures, vibration, dewatering, or other construction metho ds. C Prevent voids from forming outside of sheeting. Immediately fill voids with grout, Et concrete fill, cement stabilized sand, or other material approved by Engineer. D After completion of the structure, remove sheeting, shoring, and bracing unless Engineer has approved in writing that such temporary structures may remain. 7 Remove sheeting,shoring,and bracing in such a manner as to maintain safety during backfilling operations and to prevent damage to the Work and adjacent structures or 7 improvements. - C— E Immediately fill and compact voids left or caused by removal of sheeting with cement stabilized sand or material approved by Engineer. — 3.03 DEWATERING 7 A Maintain ground water control as directed by Sec tion ctron 01564 - Control of Ground Water and Surface Water and until the structure is sufficiently complete to provide the required weight to resist hydrostatic uplift with a minimum safety factor of 1.2. B Maintain the ground water surface a minimum of two feet below the bottom of the foundation base. 7 3.04 FOUNDATION EX CAVATION 7 A Notify Engineer at least 48 hours prior to planned completion of foundation excavations. Do not place the foundation base until the excavation is accepted by the — Engineer. CB Excavate to elevations shown on Pla ns Drawings,as needed to provide space for the foundation base, forming a level undisturbed surface, free of mud or soft material. 7 Remove pockets of soft or otherwise unstable soils and replace with foundation backfill material or a material as directed by the Engineer. Prior to placing material 07/2006. • 7 02317-4of7 . i C , 7 � CITY OF PEARLAND EXCAVATION AND BACKFILL FOR STRUCTURES ?! over it,re-compact the subgrade,scarifying as needed,to 95 percent of the maximum Standard Proctor Density according to ASTM D 698. If the specified level of compaction cannot be achieved, moisture condition the subgrade and re-compact until 95 percent is achieved,over-excavate to provide a minimum layer of 24 inches of foundation backfill material, or other means acceptable to the Engineer. C Fill unauthorized excessive excavation with foundation backfill material or other material as directed by the Engineer. fl D Protect open excavations from rainfall, runoff, freezing groundwater, or excessive drying so as to maintain foundation subgrade in a satisfactory,undisturbed condition. f? Keep excavations free of standing water and completely free of water during concrete placement. E Soils which become unsuitable due to inadequate dewatering or other causes, after initial excavation to the required subgrade, shall be removed and replaced with foundation backfill material, as directed by Engineer, at no additional cost to the 7 Owner. F Place foundation base, or foundation backfill material where needed, over the subgrade on same day that excavation is completed to final pgrade. Where base of excavations are left open for longer periods,protect them with a seal slab or cement- stabilized sand. G Where directed by the Plans Drawings,all crushed aggregate,and other free draining Class I materials,shall have a Geo-textile filter fabric separating it from native soils or select material backfill. The fabric shall overlap a minimum of 12 inches beyond where another material stops contact with the soil. H Crushed aggregate, and other Class I materials, shall be placed in uniform layers of _ 8-inch maximum thickness. Compaction shall be by means of at least two passes of a vibratory compactor. —� 3.05 FOUNDATION BASE I_ A After the subgrade is properly prepared, including the placement of foundation backfill where needed, the foundation base shall be placed. The foundation base shall consist of a 12-inch layer of crushed aggregate or cement stabilized sand. �y Alternately, a 4-inch minimum seal slab may be placed. The foundation base shall extend a minimum of 12 inches beyond the edge of the structure foundation. B Where the foundation base and foundation backfill are of the same material,both can be placed in one operation. 7_ 07/2006 02317-5of7 • I- 7 CITY OF PEARLAND EXCAVATION AND BACKFILL FOR STRUCTURES 3.06 BACKFILL A Complete backfill to surface of natural ground or to lines and a _ lans Drawings. Use existing material that qualifies as select material, unless indides shown oncated otherwise. Deposit backfill in uniform layers and com act each p layer as specified. — B Do not place backfill against concrete walls or similar structures until laboratory test breaks indicate that the concrete has reached a minimum of 85 percent of the r specified compressive strength. Where walls are supported by slabs or intermediate — walls,do not begin backfill operations until the slab or intermediate walls have been placed and concrete has attained sufficient strength. C C Remove concrete forms before starting backfill and remove shoring and bracing as _ -work progresses. CD Maintain fill material at no less,th an 2 percent below and no more than 2 percent above optimum moisture content. Place fill material in uniform 8-inch maximum 7 loose layers. Compaction of fill shall be to at least 95 percent of the maximum Standard Proctor Density according to ASTM D 698 under paved areas. Compact to at least 90 percent around structures below unpaved areas. E Where backfill is placed against a sloped excavation surface, run compaction 7 equipment across the boundary of the cut slope and backfill to form a compacted slope surface for placement of the next layer of backfill. 7 F Place backfill using cement stabilized sand in accordance with Section 02252 - Cement Stabilized Sand. 7 3.07 FIELD QUALITY CONTROL 7 A Tests will be performed initially on minimum of three different samples of each material type for plasticity characteristics,in accordance with AST M D 4318,and for gradation characteristics, in accordance with TxDOT Tex-101-E and Tex-110-E. 7 Additional classification tests will be performed whenever there is a noticeable change in material gradation or plasticity. 7 B In-place density tests of compacted subgrade and backfill will be performed according to ASTM D 1556, or ASTM D 2922 and ASTM D 3017, and at the following frequencies and conditions: 1. A minimum of one test for every 100 cubic yards of compacted backfill 7 material. 2. A minimum three density tests for each full work shift. 3. Density tests will be performed in all placement areas. 7 4. The number of tests will be increased if inspection determines that soil types or moisture contents are not uniform or if compacting effort is variable and not considered sufficient to attain uniform density. .7 7 07/2006 02317-6 of 7 7 7 CITY OF PEARLAND' EXCAVATION AND BACK ILL FOR STRUCTURES r' C At least three tests for moisture-density relationships will be initially performed for each type of backfill material in accordance with ASTM D 698. Additional moisture-density relationship tests will be performed whenever there is a noticeable change in material gradation or plasticity. D If tests indicate work does not meet specified compaction requirements,recondition, re-compact, and retest at Contractor's expense. 3.08 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140- Contractor's Use of Premises. B In unpaved areas, grade surface as a uniform slope from installed appurtenances to natural grade and stabilize as indicated on Plans. 7 3.09 PROTECTION OF THE WORK A Maintain excavation and embankment areas until start of subsequent work. Repair and re-compact slides,washouts,settlements,or areas with loss of density at no cost to the Owner B Prevent erosion at all times. Do not allow water to pond in excavations. C Distribute construction traffic evenly over compacted areas,where practical,to aid in obtaining uniform compaction. Protect exposed areas having high moisture content from wheel loads that cause rutting. END OF SECTION 7 07/2006 02317-7of7 . CITY OF PEARLAND BEDDING,BACKFILL,AND EMBANKMENT MATERIALS 1 Section 02255 BEDDING,BACKFILL,AND EMBANKMENT MATERIALS 1.0 GENERAL 1.01 SECTION INCLUDES A A reference source for materials used as embedment, backfill, back-dressing, and embankment,specified elsewhere in the Technical Specifications,and their associated material qualification testing requirements. B Source qualifications and handling of these materials. C Material use and application is specified on the Plans or in individual Technical 7 Specifications referencing materials either by Material Classification or by Product Description. D References to Technical Specifications: 1. Section 03300—Cast-in-Place Concrete 2. Section 02910—Topsoil --a 3. Section 02252—Cement Stabilized Sand E Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM D 2487, "Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System)" b. ASTM C 142, "Standard Test Method for Clay Lumps and Friable Particles in Aggregates" c. ASTM C 123, "Standard Test Method for Lightweight Particles in 7 Aggregate" d. ASTM C 40, "Standard Test Method for Organic Impurities in Fine Aggregates for Concrete" e. ASTM C 4318, "Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils" ' f. ASTM D 1140, "Standard Test Methods for Amount of Material in 7 Soils Finer the No. 200 (70-urn) Sieve" g. ASTM C 33, "Standard Specification for Concrete Aggregates" h. ASTM C 136, "Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates" i. ASTM C 131, "Standard Test Methods for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine" 07/2007 02255- 1 of 7 �_ CITY OF PEARLAND BEDDING,BACKFILL,AND EMBANKMENT MATERIALS 2.0. PRODUCTS 2.01 MATERIAL CLASSIFICATIONS A Materials shall be classified for the purpose of quality control in accordance with the Unified Soil Classification Symbols as defined in ASTM D 2487. — 1. Class I: Well-graded gravels and sands, gravel-sand mixtures, crushed well- graded rock, little or no fines (GW, SW): a. Plasticity index: non-plastic. b. Gradation: D60/Dlo-greater than 4 percent; amount passing No. 200. sieve-less than or equal to 5 percent. 2. Class II: Poorly graded gravels and sands, silty gravels and sands, little to moderate fines: a.. . .. Plasticity index: non-plastic to 4. b. Gradations: — Gradation (GP, SP): amount passing No. 200 sieve- than 5 percent. Gradation(GM,SM): amount passing No.200 sieve-between 12 percent and 50 percent. c. Borderline gradations with dual classifications(e.g.,SP-SM):amount passing No. 200 sieve-between 5 percent and 12 percent. 3. Class III: Clayey gravels and sands, poorly graded mixtures of gravel, sand, silt, and clay(GC,SC, and dual classifications, e.g., SP-SC): a. Plasticity index: greater than 7. b. Gradation: amount passing No.200 sieve-between 12 percent and 50 percent. 4. Class NA: Lean clays (CL). a. Plasticity Indexes: Plasticity index: greater than 7,and above A line. Borderline plasticity with dual classifications (CL-ML): PI between 4 and 7. b. Liquid limit: less than 50. c. Gradation: amount passing No. 200 sieve-greater than 50 percent. d. Inorganic. . 5. 'Class NB: Fat clays (CH) a. Plasticity index: above A line. b. _ Liquid limit: 50 or greater. c. Gradation: amount passing No..200 sieve-greater than 50 percent. d. Inorganic. B Use soils with dual class designation according to ASTM D 2487, and which are not defined above, according to the more restrictive class. 2.02 PRODUCT DESCRIPTIONS A . Unsuitable Material. Unsuitable soil materials are the following: 07/2007 02255-2 of 7 1 CITY OF PEARLAND BEDDING,BACKFILL,AND EMBANKMENT MATERIALS TI 1. Materials that are classified as ML,CL-ML,MH,PT,OH and OL according to ASTM D 2487. 2. Materials that cannot be compacted to the required density due to either gradation,plasticity, or moisture content. 3. Materials that contain large clods, aggregates, stones greater than 3 inches in any dimension, debris, vegetation, waste or any other deleterious materials. 4. Materials that are contaminated with hydrocarbons or other chemical contaminants. *`I B Suitable Material. Soil materials meeting specification requirements. Unsuitable soils meeting specification requirements for suitable soils after treatment with,for example, ""1 lime or cement shall be considered suitable, unless otherwise indicated. C General Fill. Material that is free of stones greater than 3 inches,free of roots, waste, debris,trash,organic material,unstable material,non-soil matter,hydrocarbon or other 71- contamination, conforming to the following limits for deleterious materials: 1. Clay lumps: Less than 0.5 percent for Class I, and less than 2.0 percent for Class II, when tested in accordance with ASTM C 142. 2. Lightweight pieces: Less than 5 percent when tested in accordance with ASTM C 123. 3. Organic impurities: No color darker than standard color when tested in accordance with ASTM C 40. D Random Fill. Soils defined by ASTM D 2487 as Class I,II,III, IV, or fat clay(CH), sand,gravel,or a combination,from excavation or borrow,which can be compacted to form stable embankments, and conforming to: 1. Liquid Limit: 65 maximum, ASTM-D4318. 2. Plasticity Index: 0 minimum, 45 maximum,ASTM-D4318. 3. Free from trash, vegetation, organic matter, large stones, hard lumps of earth and frozen, corrosive or perishable material. 4. Well broken up, free of clods greater than 6 inches, hard earth, rocks, and stones greater than 2-inch dimension. E Structural Fill. Soils defined by ASTM D 2487 as Class I,II,III,or IV,sand,gravel,or a combination, from excavation or borrow, which can be compacted to form stable embankments and fills conforming to: 7 1. Liquid Limit: 45 maximum, ASTM D.4318. i 2. Plasticity Index: 12 minimum, 20 maximum, ASTM D 4318. 3. Free from trash, vegetation, organic matter, large stones, hard lumps of earth and frozen, corrosive or perishable material. 4. Well broken up, free of clods greater than 6 inches, hard earth, rocks, and stones greater than 2-inch dimension. F Select Fill. Class HI clayey gravel or sand or Class IV lean clay or clayey soils treated with lime or cement, and conforming to: 07/2007 02255-3 of 7 E CITY OF PEARLAND BEDDING,BACKFILL,AND EMBANIMMENT MATERIALS L 1. Plasticity Index: 7 minimum, 20 maximum,ASTM D 4318. 7 2. Free from trash, vegetation, organic matter,large stones,hard lumps of earth and frozen, corrosive or perishable material. 3. Well broken up, free of clods greater than 6 inches, hard earth, rocks, and stones greater than 2-inch dimension. 7 — G Concrete Fill. Conform to requirements for Class B concrete as specified in Section 03300-Cast-in-Place Concrete. C H Topsoil. Conform to requirements q irements specified in Section 02910-Topsoil. CI Bank Sand: Durable Bank Sand classified as SP, SW, or SM by the Unified Soil Classification System(ASTM D 2487)meeting the following requirements: _7 1. Less than.15 percent passing the number 200 sieve when tested in accordance with ASTM D 1140. The amount of clay lumps or balls not exceeding 2 percent. _- 2. Material passing the number 40 sieve shall meet the following requirements when tested in accordance with ASTM D 4318: 7 a. Liquid limit: not exceeding 25 percent. b. Plasticity index: not exceeding 7. 7 J Cement Stabilized Sand. Conform to requirements of Section 02252 - Cement Stabilized Sand. . 7 K Concrete Sand. Natural sand, manufactured sand, or a combination of natural and manufactured sand conforming to the requirements of ASTM C 33 and graded within the following limits when tested in accordance with ASTM C 136: 7 SIEVE PERCENT PASSING 3/8" 100 7 No. 4 95 to 100 No. 8 80 to 100 7 No. 16 50 to 85 No. 30 25 to 60 No. 50 10 to 30 No. 100 2 to 10 7 — L Gem Sand. Sand conforming to the requirements of ASTM C 33 for course aggregates 7 specified for number 8 size and graded within the following limits when tested in accordance with ASTM C 136: .7 SIEVE PERCENT PASSING r._wW 3/8" 95 to 100 — No. 4 60 to 80 . 7 No. 8 15 to 40 — 07/2007 02255-4 of 7 7 CITY OF PEARLAND BEDDING,BACKFILL,AND EMBANKMENT MATERIALS M Pea Gravel. Durable particles composed of small,smooth,rounded stones or pebbles and graded within the following limits when tested in accordance with ASTM C 136: 1 SIEVE PERCENT PASSING 1/2" 100 3/8" 85 to 100 No. 4 10 to 30 No. 8 0 to 10 No. 16 0 to 5 N Crushed Aggregates. Crushed aggregates consist of durable particles obtained from an approved source and meeting the following requirements: 1. Materials of one product delivered for the same construction activity from a single source. 2. Non-plastic fines. 3. Los Angeles Abrasion Test wear not exceeding 45 percent when tested in accordance with ASTM C 131. 4. Crushed aggregate shall have a minimum of 90 percent of the particles retained on the No.4 sieve with 2 or more crushed faces as determined by TxDOT Tex- n 460-A,Part I. 5. Crushed stone: Produced from oversize plant processed stone or gravel,sized by crushing to predominantly angular particles from a naturally occurring single source. Uncrushed gravel are not acceptable materials for embedment where crushed stone is shown on the applicable utility embedment drawing details. 6. Crushed Concrete: Crushed concrete is an acceptable substitute for crushed stone as utility backfill. Gradation and quality control test requirements are the same as crushed stone. Provide crushed concrete produced from normal weight concrete of uniform quality; containing particles of aggregate and cement material,free from other substances such as asphalt,reinforcing steel fragments, soil, waste gypsum (calcium sulfate), or debris. 7. Gradations, as determined in accordance with TxDOT Tex-110-E. PERCENT PASSING BY WEIGHT FOR PIPE SIEVE EMBEDMENT BY RANGES OF NOMINAL PIPES SIZES >15" 15" _ 8" <8" 1" 95 - 100 100 3/4" - 60- 90 90— 100 100 1/2" 25 - 60 - 90— 100 3/8" - 20—55 40 - 70 No. 4 0 - 5 0— 10 0 - 15 No. 8 - 0 - 5 0 - 5 07/2007 02255-5 of 7 7 CITY OF PEARLAND BEDDING,BACKFILL,AND EMBANKMENT MATERIALS 7___. 3.0 EXECUTION El 3.01 SOURCE QUALIFICATIONS FOR BORROW MATERIAL ' -- A Use of material encountered in excavations is acceptable, provided applicable requirements are satisfied. If excavation material is not acceptable,provide from other 7, approved source. B Identify off-site sources for materials at least 14 days ahead of intended use so that the 7 Engineer may obtain samples for verificationtesting. _ P 7 C Obtain approval for each material source by the Engineer before delivery is started. If sources previously approved do not produce uniform and satisfactoryproducts, p cts,furnish materials from other approved sources. Materials may be subjected to inspection or Cadditional verification testing after delivery. Materials which do not meet the requirements will be rejected. Do not use material which;after approval,has become -- unsuitable for use due to segregation, mixing with other materials, or by 7 contamination. Once a material is approved by the Engineer, a Change Order is required to change to a different material. D Bank sand, select fill, and random fill, if available in the project excavation,may be 7 obtained by selective excavation and acceptance testing. Obtain additional quantities of these materials and other materials required to complete the Work from off-site sources. 7 I E The Owner does not represent or guarantee that any soil found in the excavation work will be suitable and acceptable as backfill material. L_ 3.02 MATERIAL HANDLING 7 A When material is obtained from either a commercial or non-commercial borrow pit, open the pit to expose the vertical faces of the various strata for identification and selection of approved material to be used. Excavate the selected material by vertical 7 cuts extending through the exposed strata to achieve uniformity in the product. B Establish temporary stockpile locations for practical material handling and control,and verification testing by the Engineer in advance of final placement. Obtain approval 7 from landowner for storage of backfill material on adjacent private property. C When stockpiling material near the Project Site,use appropriate methods to eliminate 7 blowing of materials into adjacent areas and prevent runoff containing sediments from — entering the drainage system. 7 D Place material suitable for backfilling in stockpiles at a distance from the trench to prevent slides or cave-ins. Do not place stockpiles of excavated materials on public. streets. 7 . , 7 07/2007 02255-6 of 7 .7 3 CITY OF PEARLAND BEDDING,BACKFILL,AND EMBANKMENT MATERIALS "1 E Place stockpiles in layers to avoid segregation of processed materials. Load material by making successive vertical cuts through entire depth of stockpile. "1 END OF SECTION 7, J. 7 `� 07/2007 02255-7 of 7 1 1 CITY OF PEARLAND CEMENT STABILIZED SAND 7 Section 02252 CEMENT STABILIZED SAND 1.0 GENERAL 1.01 SECTION INCLUDES A Cement stabilized sand for backfill and bedding. 7 B References to Technical Specifications: 1. Section 01350—Submittals 2. Section 02255—Bedding, Backfill, and Embankment Materials 3. Section 01450—Testing Laboratory Services C Referenced Standards: "1 1. American Society for Testing and Materials (ASTM) a. ASTM D 558, "Standard Test Methods for Moisture-Density (Unit Weight)Relations of Soil-Cement Mixtures" b. ASTM D 1632, "Practice for Making and Curing Soil-Cement Compression and Flexure Test Specimens in the Laboratory" c. ASTM D 1633, "Standard Test Method for Compressive Strength of Molded Soil-Cement Cylinders" d. ASTM C 150, "Standard Specification for Portland Cement" e. ASTM C 33, "Standard Specification for Concrete Aggregates" '—! f. ASTM D 2487, "Standard Classification of Soils for Engineering Purposes(Unified Soil Classification System)" g. ASTM C 142, "Standard Test Method for Clay Lumps and Friable Particles in Aggregates" h. ASTM C 123, "Standard Test Method for Lightweight Particles in Aggregate" - i. ASTM C 40, "Standard Test Method for Organic Impurities in Fine Aggregates for Concrete" j. ASTM C 4318, "Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils" k. ASTM C 94, "Standard Specification for Ready-Mixed Concrete" 1. ASTM C 31,"Standard Practice for Making and Curing Concrete Test Specimens in the Field" 1� 1.02 MEASUREMENT AND PAYMENT A Unless indicated as an Extra Item, no separate payment will be made for cement 7- stabilized sand under this Section. Include cost in Bid Items for applicable utility or structure installation. 7 B If use of cement stabilized sand is allowed, based on the Engineer's direction, and indicated in Section 00300—Bid Proposal as an Extra Item,measurement will be on a "1 per ton basis. A conversion between volumes calculated based on theoretical limits and total weight will be made based on a ratio of 1.64 tons per cubic yard. 02/2009 02252- 1 of 5 CITY OF PEARLAND CEMENT STABILIZED SAND 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 - Submittals. B Submit material qualification and design mix tests to include: 1. Three series of tests of sand or fine aggregate material from the proposed "source. T.ests shall include procedures defined in this Section, 2.01 Materials" 2. Three moisture-density relationship tests prepared using the material qualified by the tests in this Section, 1.03B 1. Blends of fine aggregate from crushed concrete and bank run sand shall be tested at the ratio to be used for the design mix testing. 3. . Design mix report,to meet the specifications of this Section, 1.04 "Design Requirements". The design mix shall include compressive strength tests after 48-hours and 7 days curing. 1.04 DESIGN REQUIREMENTS A _ Design sand-cement mixture to produce a minimum unconfined compressive p ve strength of 100 pounds per square inch in 48 hours when compacted to a minimum 95 percent in accordance with ASTM D 558 and when cured in accordance with ASTMD 1632, and tested in accordance with ASTM D 1633. Mix shall contain a minimum of 1-1/2 sacks of cement per cubic yard. Compact mix with a moisture content on the dry side of optimum. 2.0 PRODUCTS 2.01 MATERIALS . A Cement shall be Type 1 Portland cement conforming to ASTM C 150. E�" B Sand shall be clean, durable, and meet grading requirements for fine aggregates of ASTM C 33 and the following requirements: 1. Classified as SW, SP or SM by the United Soil Classification System of L ASTM D 2487. 2. Deleterious material content: a. Clay lumps shall comprise less than 0.5 percent by ASTM C 142. L; b. Lightweight pieces shall comprise less than 5.0 percent by ASTM C 123. c. Organic impurities shall produce color no darker than the standard color by ASTM C 40 ASTM. 3. Plasticity index of 4 or less when tested in accordance.with ASTM D 4318. C Fine aggregate,manufactured from crushed concrete meeting the quality requirements for crushed rock material in Section 02255 - Bedding, Backfill, and Embankment Materials, may be used as a complete or partial substitute for Bank Sand. The blending ratio of fine aggregate from crushed concrete and Bank Sand shall be defined in the.mix design report. 02/2009 02252-2 of 5 1 1 CITY OF PEARLAND CEMENT STABILIZED SAND D Water shall be potable,free of oils,acids,alkalies,organic matter,or other deleterious substances,meeting requirements of ASTM C 94. 2.02 MIXING MATERIALS A Thoroughly mix sand, cement and water in proportions of the mix design using a pugmill-type mixer. The plant shall be equipped with automatic weight controls to ) ensure correct mix proportions. B Stamp batch ticket at plant with time of loading directly after mixing. Material not placed and compacted within 4 hours after mixing shall be rejected. 3.0 EXECUTION I 3.01 PLACEMENT AND COMPACTION A Place sand-cement mixture in 8-inch-thick loose lifts and compact to a minimum of 95 percent of ASTM D 558, unless otherwise specified on Plans. The moisture content during compaction shall be on the dry side of optimum but sufficient for "1 hydration. Perform and complete compaction of sand-cement mixture within 4 hours after addition of water to mix at the plant. B Do not place or compact sand-cement mixture in standing or free water. 3.02 FIELD QUALITY CONTROL A Testing will be performed under provisions of Section 01450 - Testing Laboratory Services. B Mixing plant inspections will be performed periodically. Material samples will be obtained and tested in accordance with this Section, 2.01 "Materials", if there is evidence of change in material characteristic. 7 C One sample of cement stabilized sand shall be obtained for each 150 tons of material placed per day with no less than one sample per day of production.Random samples of delivered cement stabilized sand shall be taken in the field at point of delivery in accordance with ASTM 3 665.Obtain three individual samples of approximately 12 to 15 lb each from the first, middle, and last third of the truck and composite them into one sample for test purpose. �_ D Prepare and mold four specimens (for each sample obtained) in accordance with ASTM D558,Method A,without adjusting moisture content.Samples will be molded 7_ at approximately same time material is being used,but no later than 4 hours after water is added to mix. E After molding,specimens will be removed from molds and cured in accordance with ASTM D 1632. 02/2009 02252-3 of 5 i 1 i — CITY OF PEARLAND CEMENT STABILIZED SAND F . Specimens will be tested for compressive strength in accordance with ASTM D 1633, j Method A. Two specimens will be tested at 48 hours plus or minus 2 hours and two 7 specimens will be tested at 7 days plus or minus 4 hours. G A strength test will be average of strengths of two specimens molded from same sample of material and tested at same age.Average daily strength will be average of strengths of all specimens molded during one day's production and tested atsame age. 71. H Precision and Bias: Test results shall meet recommended guideline for precision inASTM D 1633 Section 9. 7 7 I Reporting: Test reports shall contain, as a minimum,the following information: 1. Supplier and plant number 2. Time material was batched 3. Time material was sampled C4. Test age(exact hours) 5. Average 48-hour strength 6. Average 7-day strength 7 7. Specification section number 8. Indication of compliance/non-compliance 9. . Mixture identification 7 10. Truck and ticket numbers 11. The time of molding 12. Moisture content at time of molding 13. Required strength 7 14. Test method designations 15. Compressive strength data as required by ASTM D 1633 � 16. Supplier mixture identification 7' 17. Specimen diameter and height, in. — 18. Specimen cross-sectional area, sq. in. 7 J The cement content will be checked on samples obtained in the field whenever there are apparent changes in the mix properties. E3.03 ACCEPTANCE A Strength level of material will be considered satisfactory if: 1. The average 48-hour strength is greater than 100 psi with no individual 7 strength test below 70 psi. 2. All 7-day individual strength tests(average of two specimens)are greater than 7 or equal to100 psi. B Material will be considered deficient when 7-day individual strength test(average of 7 two specimens) is less than 100 psi but greater than 70 psi. See Paragraph 3.04 Adjustment for Deficient Strength. 7 C The material will be considered unacceptable and subject to removal and replacement at Contractors expense when individual strength test(average of two specimens)has 7-day strength less than 70 psi 7 02/2009 02252 4 of 5 7 . CITY OF PEARLAND CEMENT STABILIZED SAND 7 D When moving average of three daily 48-hour averages falls below 100 psi,discontinue shipment to project until plant is capable of producing material,which exceeds 100 psi at 48 hours. Five 48-hour strength tests shall be made in this determination with no 7 individual strength tests less than 100 psi. E Testing laboratory shall notify Contractor,Project Manager,and material supplier by r"I facsimile of tests indicating results falling below specified strength requirements 1 within 24 hours. F If any strength test of laboratory cured specimens falls below the specified strength, 7- Contractor may, at his own expense, request test of cores drilled from the area in question in accordance with ASTM C42.In such cases,three(3)cores shall be taken 7 for each strength test that falls below the values given in 3.03.A. G Cement stabilized sand in an area represented by core tests shall be considered satisfactory if the average of three(3)cores is equal to at least 100 psi and if no single 7.. core is less that 70 psi.Additional testing of cores extracted from locations represented by erratic core strength results will be permitted. 3.04 ADJUSTMENT FOR DEFICIENT STRENGTH A When mixture produces 7-day compressive strength greater than or equal to 100 psi, then material will be considered satisfactory and bid price will be paid in full. B When mixture produces 7-day compressive strength less than 100 psi and greater than or equal to 70 psi,material shall be accepted contingent on credit in payment Compute credit by the following formula: Credit per Cubic Yard=$30.00 x 2 (100 psi -Actual psi) 100 C When mixture produces 7-day compressive strength less than 70 pounds per square inch, then remove and replace cement-sand mixture and paving and other necessary work at no cost to City. END OF SECTION 02/2009 02252-5 of 5 CITY OF PEARLAND GEOTEXTILE Section 02370 GEOTEXTILE 1.0 GENERAL 1.01 SECTION INCLUDES 7 A Geotextile, also called filter fabric, in applications such as under a granular fill, as a pipe embedment wrap,around the exterior of a tunnel liner,or around the foundations of pipeline structures. B References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals C Referenced Standards: 1. American Society for Testing and Materials (AS TM) a. ASTM D 4632, Standard Test Method for Grab Breaking Load and f Elongation of Geotextiles" b. ASTM D 4533,"Standard Test Method for Trapezoid Tearing Strength of Geotextiles" 7- c. ASTM D 4833,"Standard Test Method for Index Puncture Resistance of Geotextiles, Geomembranes, and Related Products" d. ASTM D 3786,"Standard Test Method for Hydraulic Bursting strength r! of Textile Fabrics" e.. ASTM D 4751, "Standard Test Method for Determining Apparent Opening Size of a Geotextile" f f. ASTM D 4491, "Standard Test Method for Water Permeability of Geotextiles by Permittivity" 2. American Association of State Highway and Transportation Officials (AASHTO) 1.02 MEASUREMENT AND PAYMENT 7- A Unless indicated as a Bid Item„no separate payment will be made for work performed under this Section. Include cost in Bid Items for Work requiring geotextile. B If Geotextile is included as a Bid Item,measurement will be based on the Units shown in Section 00300—Bid Proposal and in accordance with Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit the standard manufacturer's catalog sheets and other pertinent information,for J approval,prior to installation. 07/2006 02370-1 of 2 fl L_ CITY OF PEARLAND GEOTEXTILE 7 C Submit installation methods,as a part of the work plan for tunneling or for excavation 7 and backfill for utilities. Obtain approval from Engineer for Geotextile material and the proposed installation method prior to use of the geotextile. 2.0 PRODUCTS 7 2.01 GEOTEXTILE 7 A Provide a geotextile(filter fabric)designed for use in geotechnical applications which forms a permeable layer or media while retaining the soil matrix. 7 B Use a fabric which meets the physical requirements for Class A Subsurface Drainage installation conditions as defined in AASHTO M288 and as specified in this Section, 2.02"Properties". C2.02 PROPERTIES A Material:Non-woven,non-biodegradable,fabric consisting only of continuous chain 7 polymer filaments or yarns, at least 85 percent by weight poly-olefins, polyesters or polyamide, formed into a dimensionally stable network. 7 B Chemical Resistance: Inert to commonly encountered chemicals and hydrocarbons over a pH range of 3 to 12. 7 C Physical Resistance: Resistant to mildew and rot, ultraviolet light exposure, insects and rodents. 7 D Minimum Test Values: PROPERTY VALUE(MIN) TEST METHOD 7 Grab strength 180 lbs ASTM D 4632 Trapezoidal Tear Strength 50 lbs ASTM D 4533 7 Puncture Strength 80 lbs ASTM D 4833 Mullen Burst Strength 290 psi ASTM D 3786 CApparent Opening Size(1) 0.25 mm ASTM D 4751 Permittivity(sec 1) 0.2 ASTM D 4491 7 (1) Maximum average roll value 7 3.0 EXECUTION - Notused 7 END OF SECTION C07/2006 02370-2 of 2 7 CITY OF PEARLAND AUGERING PIPE OR I�. CASING FOR SEWERS Section 02415 AUGERING PIPE OR CASING FOR SEWERS 1.0 GENERAL 1.01 SECTION INCLUDES A Installation of pipe and casing for sanitary sewer by methods of angering. g B References to Technical Specifications: 1. Section 01570—Trench Safety.System 2. Section 01200—Measurement and Payment Procedures 3. Section 01350—Submittals 4. Section 01563 —Control of Ground Water and Surface Water 5. Section 01500—Temporary Facilities and Controls 6. Section 02530—Gravity Sanitary Sewers 7. Section 02430—Tunnel Grout 8. Section 02318—Excavation and Backfill for Utilities 9. Section 01140—Contractor's Use of Premises C Referenced Standards: pry 1. American Railway Engineering Association (AREA) Manual for Railway Engineering 2. American Association of State Highway and Transportation Officials (AASHTO) 3. American Water Works Association (AWWA) a. AWWA C200, Steel Water Pipe- 6 in. (150 mm) and Larger D Definitions: 1. Dry Augering - installation of steel casing by excavating the soil at the advancing end of casing and transporting the spoil through the casing by an otherwise uncased auger, while advancing the casing by jacking at the same rate as the auger excavation progresses. 2. Slurry Augering-installation of casing or sewer pipe by first drilling a small diameter pilot hole from auger pit to auger pit,followed by reaming the bore to full diameter by augering with slurry, and installing the casing or pipe by a pull-back or jacking method. 3. Augered Pipe-the Contractor's installed water or sewer pipe in augered hole. 4. Augered Casing with Pipe - the Contractor's installed water or sewer pipe in augered casing. 1.02 MEASUREMENT AND PAYMENT A . Measurement for augered casing with sewer pipe will be on a linear foot basis measured from end to end of the casing. 07/2006 02415- 1 of 7 CITY OF PEARLAND AUGERING PIPE OR CASING FOR SEWERS B Payment of angered casing with sewer pipe will be full compensation for all labor, ^� equipment,casing,sewer pipe,materials and supervision for construction complete in place including dewatering,augering,joints,spoil removal,pipe installation,grouting, utility adjustments,testing,and cleanup,and other work necessary for construction as shown on the Plans and as specified. C Measurement of augered sewer pipe will be on a linear foot basis along the axis of the pipe from auger pit to auger pit. D Payment of augered sewer pipe will be full compensation for labor,pipe, equipment, materials, and supervision for construction complete in place including dewatering, jacking,utility adjustments,testing,cleanup,and other work necessary for construction as shown on the Plans and as specified. E No separate payment will be made for auger pits and other excavations under this section. Include cost of excavation, surface restoration, pavement repair, etc., for auger pits or observation pits in Sections related to the open-cut sewer installation 7 portion of the Work. Include cost of trench safety for auger pits or observation pits in Section 01570—Trench Safety Systems. F Refer to Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS 1 A Review. Submittal shall be made in accordance with Section 01350—Submittals. The Engineer will review submitted plans, details and data for compliance with specifications. Contractor shall not commence work on any items requiring pipe and casing angering work plan, or other submittal until the submittal have been reviewed and accepted by the Engineer. Such review by the Engineer shall not be construed in any way of relieving the Contractor of his responsibilities under the Contract,shall not be construed by the contractor as an endorsement by the Engineer that such methods are constructable or will work for the specific subsurface soils encountered. Structural 7 designs and other engineered components shall be signed and sealed by a Professional. Engineer registered in the State of Texas. B Pipe and Casing Angering Operation. 1. Submit for review a Pipe and Casing Angering Work Plan with complete drawings and written description identifying details of the proposed method of construction and the sequence of operations to be performed during construction, as required. The drawings and descriptions shall be sufficiently detailed to demonstrate to the Engineer whether the proposed materials and procedures will meet the requirements of this Section. 7 2. Depending on the Contractor's method of construction, the Pipe and Casing Augering Work Plan shall be submitted on the following items: a. Arrangement drawings and technical specifications of the angering equipment and experience record of the Contractor. b. Method of controlling line and grade of augering operation. 07/2006 02415-2 of 7 7 . CITY OF PEARLAND AUGERING PIPE OR 7 CASING FOR SEWERS 7 c. Method of spoil and slurry removal, including surface storage and disposal. d. Details of the pipe or casing installation. e. Grouting techniques to be used for filling annular void between casing and sewer pipe,where required,and for filling over excavation,if any, 7 including equipment,pumping and injection procedures,pressure grout types,and mixtures. 7 f. Location and construction of auger pits, including details for all required ground support installation not included in the Trench Safety Plan. 7 g. Groundwater control system per requirements in this section and in accordance with Section 01563—Control of Ground Water and Surface Water, as required by construction method. E3. Casing and pipe fabrication drawings,including joint details. C Trench Safety 7 1. Shall be in accordance with Section 01570—Trench Safety System. 2. To the extent that excavation for pipe and casing augering involves work not covered by Contractor's Trench Safety Plan, the safety provisions of these 7 excavations shall be addressed in the Pipe and Casing Augering Work Plan. D Quality Control Methods. At least 30 days prior to the start of augering,the Contractor C shall submit a description of the quality control methods proposed for use in this operation to the Project Manager. The submittal shall include: 1. Supervision. Supervisory control to ensure that work is performed in accordance with the Plans and Specifications, and Pipe and Casing Augering 7 Work Plan. 2. Line & Grade. Procedures for surveying, controlling and checking line and grade, including field forms. 7 3. Augering Observation and Monitoring. Procedures for preparing and submitting daily logs of augering operations,including field forms. 7 4. Products and Materials. A plan for testing and submittal of test results to demonstrate compliance with the specification and Contractor's design criteria for permanent products, material and installations. The plan shall identify applicable standards and procedures for testing and acceptance. 7 5. Monitoring Settlement. Submit a settlement Monitoring Plan if requested by the Engineer. 7 1.04 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in 7 conformance with the practices described in Section 01500—Temporary Facilities and Controls. 7 r°' 07/2006 02415-3 of 7 E 1 CITY OF PEARLAND AUGERING PIPE OR CASING FOR SEWERS 1.05 CRITERIA FOR DETERMINING INSTALLATION LOADS 7 A Pipes and casings shall be selected by the Contractor to carry overburden pressure and applicable surcharge and installation loads. B The criteria to be used for truck loading shall be HS-20 vehicle loading distributions in accordance with AASHTO. C The Contractor shall be responsible for the selection of the casing,pipe,and pipe joints to carry the thrust of the jacks or loads due to the pulling mechanism. 7 D The Contractor shall select the diameter of the casing to meet the minimum dimensions defined in the Plans, and to permit practical installation(including skids, pipe spiders and shims, if applicable) and grouting, where required. 2.0 PRODUCTS 7 2.01 MATERIALS A Casing shall be provided where shown on Plans or indicated in Technical Specifications and be new, uncoated welded steel pipe, manufactured in accordance with AWWA C200. The design stress in the pipe wall shall be 50 percent of the minimum yield point of the steel or 18,000 psi, whichever is less, when subjected to the loading conditions. The design deflection to be used in determining wall thickness shall not exceed 3 percent of nominal casing pipe size. B Sewer pipe shall be provided in accordance with Section 02530— Gravity Sanitary fl Sewers. The sewer pipe shall be selected by the Contractor and verified by the Contractor's engineer to safely withstand all service loads, including overburden pressures and surcharge loads together with all forces and pressures induced in pipe and joints during installation. C For grouting materials refer to Section 02430—Tunnel Grout. 7 D Where casings are required by Plans,casing insulator width 8 inches for pipe sizes 4 to 14 inches; 12 inches for pipe sizes 16 to 30 inches. �? 1. For welded steel pipe 12 inches and smaller, use Pipeline Seal & Insulator Model PE, or approved equal. 2. For other pipe materials, use Pipeline Seal & Insulator Model C8G-2 or 7 approved equal for pipe sizes up to 12 inches. 3. For all pipe sizes above 12 inches,use Pipeline Seal&Insulator Model Cl2G- 2 or approved equal. E Casing End Seals: Provide Pipeline Seal&Insulator Model C or approved equal. 3.0 EXECUTION 07/2006 02415-4 of 7 7 7 CITY OF PEARLAND AUGERING PIPE OR CASING FOR SEWERS 3.01 DRY AUGERING(CASING ONLY) 7 A Provide horizontal augering equipment of sufficient capacity for the diameter and length of the casing to be installed and the anticipated ground conditions. C B Provide heavy-duty jacks of Y Y a capacity suitable for forcing the excavating auger and casing through the ground and a suitable jacking frame or backstop. Use operating 7 jacks constructed so that even pressure is applied to all jacks used. C Provide steerable front section of casing to allow vertical grade adjustments. A water 7: level or other means shall be provided to allow monitoring of the grade elevation of the auger casing. D Set casing to be jacked on guides,properly braced together, to support the section of .7 pipe and direct it to proper line and grade. Place the whole jacking assembly so as to line up with the direction and grade of the pipe. 7 E In unconsolidated soil formations,bentonite may be used to seal the voids outside the wall and furnish lubrication for the installation of casing. The use of water to assist in lubrication to facilitate the removal of spoil is permitted,however,water jetting of the 7 soil is not allowed when jacking the casing. F Insofar as practical and depending on the character of the soil encountered during the 7 augering operation,conduct operations without interruption to prevent the pipe from seizing up in the hole before the installation is complete. 7 G Repair casing damaged in augering operations by method acceptable to the Engineer or remove and replace it. E3.02 SLURRY AUGERING A Provide horizontal boring equipment for drilling of pilot hole, slurry augering 7 equipment for excavating the full-sized hole for casing or pipe installation. B Drill a small diameter pilot hole for the entire length of the augered pipe. Check the pilot hole for line and grade at the receiving end to determine if the larger diameter 7 casing hole will comply with this Specification. The pilot hole shall be redrilled if the installed pipe would not meet the specified tolerances. 7 C Auger the large-diameter hole by mechanical means for reaming the pilot hole. The diameter of the augered hole shall be not more than 1 inch greater than the outside diameter of the installed pipe measured from the barrel of the pipe. Place excavated Cmaterial outside the working pit and dispose of it, as specified in Section 01500 — Temporary Facilities and Controls. Jetting is not permitted. Augered holes which do not meet the specified tolerances shall be grouted. 7 D In unconsolidated soil formations,use a bentonite slurryto maintain a stable hole and furnish lubrication for the installation of the pipe. Install the pipe or casing in one C07/2006 02415-5 of 7 7 CITY OF PEARLAND AUGERING PIPE OR CASING FOR SEWERS operation with the displacement of cuttings and slurry from the hole in potentially '-1 unstable soils to prevent casing and settlement of the ground surface. E Depending on the character of the soil encountered during the augering operation, conduct operations without interruption,insofar as practical,to prevent the pipe from seizing up in the hole before the installation is complete. 7 F Repair casing or sewer pipe damaged in augering operations by method acceptable to the Engineer or remove and replace it. 3.03 AUGER PITS A Contractor's Pipe and Casing Augering Work Plan shall identify the location, size, depth and layout, and ground support design of all angering and observation pits, as well as a schedule of dates that each pit is expected to be open. B Auger pits that are excavated as a part of open-cut sewer construction shall be in "1 accordance with Section 02318—Excavation and Backfill for Utilities. ff C Install sheeting,lining,shoring,and bracing required for the protection of the workmen A'q and the public in accordance with Section 01570—Trench Safety Systems. 3.04 PIPE IN CASING A Pipes shall be installed in angered casings in accordance with this Section, as applicable. B Bottom of trench adjacent to each end of casing should be graded to provide firm, uniform, and continuous support for carrier pipe. If trench requires some backfill to establish final trench bottom grade, backfill material should be placed in 6-inch lifts and each layer properly compacted. C Install casing end seals in accordance with manufactures specifications. 'l 3.05 SPACER AND INSULATOR INSTALLATION A Casing spacers and/or insulators should be installed in accordance with manufacturer's instructions. Special care should be taken to ensure that all subcomponents are correctly assembled and evenly tightened,and that no damage occurs during tightening or carrier pipe insertion. B Spacing of spacers or insulators should ensure that carrier pipe is adequately supported throughout its length, particularly at ends, to offset settling and possible electrical shorting. End spacer must be within 6 inches of end of casing pipe,regardless of size of casing and carrier pipe or type of spacer used. Casing spacers are designed to withstand much greater loads than can be safely applied to most coatings. Therefore, spacing between spacers depends largely on load bearing capabilities of pipe coating and flexibility of pipe. 07/2006 02415-6 of 7 n r CITY OF PEARLAND AUGERING PIPE OR CAS ING FOR SEWERS 1. Spacing shall be as shown on Plans with maximum distance between spacers to be 10 feet for pipe sizes 4 to 14 inches and 8 feet for pipe sizes 16 to 30 inches. 2. For ductile iron pipe,flanged pipe,or bell-and-spigot pipe, spacers should be installed within one foot on each side of bell or flange and one in center of (� joint when 18- to 20-foot-long joints are used. 3. If casing or carrier pipe is angled,bent, or dented,spacing should be reduced. C Where metallic carrier pipe is to be placed in metallic casing, provide electric insulating type spacers to ensure no contact between carrier pipe and casing. 3.06 TOLERANCES A Acceptance criteria for Augered Casing,as defined in this Section, 1.01D,shall be±6 inches in horizontal alignment from theoretical at any point between manholes, including the receiving end, and±1-1/2 inches in elevation from the theoretical. Acceptance criteria for Augered Pipe, as defined in this Section, 1.01D, shall be±6 inches in horizontal alignment from theoretical at any point between manholes, including the receiving end, and±1/8 inch in elevation from the theoretical. C If a deviation exceeds these tolerances,the Contractor may be required to re-auger the casing or sewer pipe at no additional cost to the City, including any backfilling or grouting of the abandoned hole. Any redesign of the sewer and manholes made necessary by out-of-tolerance casing or sewer pipe shall be at the Contractor's expense and shall be signed by a Professional Engineer registered in the State of Texas. The installed pipe must be capable of meeting the design flow and velocities for a full pipe condition. Contractor is responsible for final selection of casing diameter to assure these tolerances. C3.07 FIELD QUALITY CONTROL A Sewer pipes installed under this Section shall be tested under the provisions of the applicable Technical Specification for the type of sewer pipe installed. 3.08 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. 3.09 PROTECTION OF THE WORK A Protect and maintain all pipe and casing augering in good condition until completion of Work. END OF SECTION 07/2006 02415 7 of 7 E CITY OF PEARLAND WATER MAINS 7 Section 02510 EWATER MAINS 1.0 GENERAL 7 1.01 SECTI ON INCLUDES 7 A Installation of water mains,including valves, fire hydrants, wet connections, cut and plug of mains, disinfection, and hydrostatic testing for pipelines. B References to Technical Specifications: 7 1. Section 01200—Measurement and Payment Pro cedures ocedures 2. Section 01350—Submittals 7 3. Section 02514—Fire Hydrant Assembly 4. Section 03300—Cast-in-Place Concrete 5. Section 02512—Polyethylene Wrap 7 6. Section 02417—Augering Pipe for Water Lines 7. Section 02515—Water Tap and Service Line Installation 8. -Section 02318—Excavation and Backfill for Utilities 7 9. Section 02980—Pavement Repair 10. Section 01450—Testing Laboratory Services C Referenced Standards: Texas Commission on Environmental Quality(TCEQ) 2. American Water Works Association (AWWA) 3. American Society for Testing and Materials (ASTM) 7 1.02 MEASUR EMENT AND PAYMENT 7 A Measurement for water mains open cut or augered, with or without casing, is on a linear foot basis for each size of pipe installed. 1. Mains: Measure along axis of pipe and include fittings and valves. E2. Branch Pipe: Measure from axis of main to end of branch. B Refer to Section 01200—Measurement and Payment Procedures. 7 1.03 QUALITY ASSURANCE A Regulatory Requirements 7 1. Pipe shall bear Underwriter's Laboratories(UL)or Factory Mutual(FM)label. 2. Pipe material acceptable without penalty to State's community fire insurance rating agency. 3. System acceptable to City and TCEQ. 7 4. Bacteriological disinfection acceptable to local health officials and Texas Department of Health. L' 5. Water taps and draw off lines in compliance with local municipal specifications and regulations. E03/2008 02510- 1 of 9 7 1 CITY OF PEARLAND WATER MAINS 1.04 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Product Data: 1. Obtain from pipe manufacturer installation instructions,manuals,and printed recommendations, except for Owner furnished pipe. 'i 2. Retain product data on job site for reference. J 3. Submit certified record of tests of pipe, fittings, or valves upon request of Engineer. 4. Submit hydrant manufacturer flow and friction loss curve. C Samples: 1. Notify City when system is pressure tested and disinfected. City will take all samples for bacteriological testing as required by TCEQ. 1.05 PRODUCT HANDLING f A Deliver pipe to trench in sound, undamaged condition. B Cut pipe neatly avoiding sharp, ragged, or unbeveled,plain ends and do not damage lining by cutting. C Remove damaged or rejected materials from project site. 1 1.06 ENVIRONMENTAL REQUIREMENTS A Do not lay pipe when it is raining or when trench is muddy, soft, or contains standing b water. 2.0 PRODUCTS 2.01 FITTINGS A Ductile iron or gray cast iron complying with AWWA C 110. B Mechanical joint fittings: AWWA C 110 and C 111. 1 C All fittings shall be cement lined according to AWWA C-104. 2.02 POLYVINYL CHLORIDE (PVC)PRESSURE PIPE A Pipe: PVC pressure pipe 4 inches through 12 inches for water shall conform to AWWA C-900. Class 150 pipe shall conform to requirements of DR18. PVC compounds shall conform to ASTM D1784. B Joints: Joints of plastic pressure pipe using elastomeric seals shall conform to ASTM D3139. Elastic seals shall conform to ASTM F-477. 03/2008 02510-2of9 7 7 CITY OF PEARLAND WATER MAINS 7 C Fittings:Above ground Fittings shall have welded steel joints conform to AWWA C- 100 with joints meeting the requirements of AWWA C-111 and below ground shall be 7 mechanical joint fittings meeting the requirements of AWWA C-111 unless approved ed otherwise in writing by the Engineer. 7 D Tests: 1. Each standard,random,or short length of pipe and each coupling sleeve,when manufactured from same material as pipe, shall be tested in accordance with USDC CS-272. 7 2. Use Class 150 except pipe 6 in. or less shall be Class 200. 7 2.03 FIRE HYDRANTS A Conform to requirements of Section 02514—Fire Hydrant Assembly. 7 2.04 VALVES A General: Manual operators: a. Provide handwheel manual operators for in-plant valves. b. Equip buried valves with 2 in. square operating nuts. 7 2. Furnish no less than one operating key with each lot of 10 buried valves with nut operators. 7 3. Rotation: a. Direction: OPEN COUNTERCLOCKWISE (OPEN LEFT). 4. Shop coating: 7 a. Shop coat ferrous metal surfaces of valves both interior and exterior for corrosion protection. b. Protect internal and external iron surfaces of valves with coating of 4 mils. of two-part thermosetting epoxy: AWWA C 550. 7 5. Working and test pressures: a. Valves 2 in. through 12 in.: 200 psi working pressure, 400 psi hydrostatic test pressure. b. Valves 14 in. through 36 in.: 150 psi working pressure, 300 psi 7 hydrostatic test pressure. 7 B Gate Valves (2 in. Through 36 in.): 1. Buried valves: a. Comply with AWWA C500,non-rising stem(NRS);resilient wedge,. 7 b. Cast iron body and bonnet,inside screw. c. Bronze: Seat and disc rings, stem and mountings, and disc wedges. d. "O" ring sealed stem and 2 in. square operating nut. 7 e. Valves 2 in. through 12 in.: Vertical type without by-passes. f. Valves 16 in.through 36 in.: Horizontal type with enclosed steel bevel gears resilient wedge, standard size by-pass valves. 7 g. Stuffing box and bonnet bolts and nuts to be 304 stainless steel. h. Install in section of horizontal pipe. i. Mechanical joint ends with gasket complying with AWWA C 111. CO3/2008 02510-3 of 9 7 CITY OF PEARLAND WATER MAINS j. Acceptable product: 1) "500 Series", Kennedy Valve Manufacturing Co. 2) "2480 Series", CLOW. 3) "A-2380 Series", Mueller Co. C Tapping Valves and Tapping Sleeves: a. Tapping sleeves shall be solid stainless steel and valves shall conform with all others as mentioned above. 7 D Valve Boxes: 1. Cast iron,threaded screw extension sleeve type,adjustable suitable for depth of ,..� cover over pipe, with base and cover. 1 2. 3/16 in. thick, 5 in. diameter minimum. 3. Coat valve box, base, and cover with coating of 4 mils. of two-part thermosetting epoxy: AWWA C 550.. 4. Provide with suitable cast iron bases and covers. 5. Covers: Cast name designating type of service, e.g., "WATER" for water service. 2.05 RELATED MATERIALS A Concrete: As specified in Section 03300—Cast-in-Place Concrete. B Meter Box: 1. Cast iron to Owner's dimensions: ASTM A 48.. C Underground Copper Tubing: Type "K" soft annealed, ASTM B 88, straight 20 ft. lengths in 1 ' in. and 2 in. sizes. D Corporation and Curb Stops and Fittings: ASTM B 62,NSF 61 low lead brass. 3.0 EXECUTION 3.01 PREPARATION A Thoroughly clean pipe interiors of foreign matter before being lowered into trench. B Clean hydrant and valve interiors of foreign matter before installation. 7 3.02 INSTALLATION A Inspection: 1. Carefully examine each piece of pipe for soundness and specifications compliance after delivery at trench before placing in trench. 2. Remove rejected pipe and fittings from site of work and replace with sound pipe. 3. Pipe and fittings will be rejected because of any of the following: a. Cracks in pipe or fittings. b. Damaged or cracked ends. 03/2008 02510-4 of 9 711' 7 CITY OF PEARLAND WATER MAINS c. Damaged gaskets or gasket grooves. d. Less than minimum wall thickness. e. Defects and deformations. B Cleaning: 7 1. Clean interior of pipe and fittings of foreign matter before laying. 2. Keep interiors and ends clean during installation. 3. Keep joint contact surfaces clean during installation. 7 4. Take precautions to prevent foreign material from entering pipe during installation. 5. Do not place rubbish, tools,rags, or other materials in pipe. 7 6. Whenever pipe laying is stopped,place plugs in uncompleted ends of pipe. C Installation: 7 1. Install pipe, couplings, and fittings in accordance with pipe manufacturer's recommendations. 7 2. Install gaskets and necessary lubricants. 3. Full length of each barrel of pipe shall rest solidly on pipe bed with recesses excavated to accommodate bells and joints. 4. Take up and relay pipe that has grade or joint disturbed. 7 5. Do not joint pipe with water in trench. 6. Keep water out of trench until jointing is completed. 7. Do not lay water pipe closer than 10 ft. horizontally from sanitary sewer. 8. Do not locate joints at cross-overs with sanitary sewers closer than 9 ft. from L. cross-over point. 9. Where water lines cross sanitary sewers, construct in accordance with TCEQ C standards. 10. Where pipe ends are left for future connections,install valve and plug or cap end. Forty feet minimum line section required between valve and plug or cap 7 end. 11. Install concrete thrust blocking at bends and tees and at ends of lines to provide adequate reaction backing. CD Polyvinyl Chloride (PVC)Pipe: Install in compliance with ASTM D 2774. E Steel Pipe: Installation in an augered hole shall comply with Section 02417 — r Augering Pipe for Water Lines. F Setting Valves, Valve Boxes, and Fire Hydrants: 71. Set plumb. 2. Center valve boxes on valves. 3. Where feasible, locate valves outside area of roads and streets. t 4. Carefully tamp earth fill around each valve box to distance of 4 ft.on all sides f...._ or to undisturbed trench face if less than 4 ft. 5. Set hydrants at elevation so that connecting pipe will not have less cover than 7 mains. 6. Set hydrants on concrete pad. CO3/2008 02510-5 of 9 7 CITY OF PEARLAND WATER MAINS 7 7. Depth of bury of hydrant is defined as distance from bottom of inlet pipe to ground line. 8. Place concrete thrust block back of hydrant opposite pipe connections set against vertical face of trench to prevent from blowing off line. 9. Use 5/8 in. stock stainless steel bridle rods and rod collars. 7 10. Place not less than 5 cu. ft. of broken stone around base of hydrant to ensure I drainage. 11. Compact backfill to grade line. 12. Tighten stuffing boxes. 13. Test hydrant and valve in opened and closed position to ensure that parts are in working condition. 7 G Anchorage of Fittings: 1. Anchor tees, elbows, and plugs in water mains with concrete thrust blocks. ..� 2. Place blocks so that joints will be accessible for inspection and repair. 3.03 WET CONNECTIONS 7 A Definitions: 1. Wet connections consist of isolating sections of pipe to be connected with installed valves,draining the isolated sections,and completing the connections. 2. Connection of 2 inch or smaller lines,which may be referred to on Plans as "2 inch standard connections"or"gooseneck connections"will be measured as 2" wet connections. This item is not to be used as any part of a 2-inch service 7 line. B Materials: 1. Corporation stops and saddles shall conform to requirements of Section 02515- Water Tap and Service Line Installation. 2. Valves shall conform to requirements of Section 02541 — Fire Hydrant Assembly. 3. Brass fittings shall conform to requirements of AWWA C800. C Execution: 1. Plan wet connections in such manner and at such hours as to least inconvenience public. Notify Engineer at least 48 hours in advance of making connections. 2. DO NOT OPERATE VALVES ON MAINS IN USE BY OWNER.Owner will handle, at no cost to Contractor, all operations involving opening and closing valves for wet connections. 3. Conduct connection operations when Inspector is at job site. Connection work shall progress without interruption until complete, once existing mains have ,..� been cut or plugs has been removed for making connections. D 2-Inch Wet Connections 1. Tap water main. Provide and install corporation stops;saddles;copper tubing 7 as required for line and grade adjustment;and brass fittings necessary to adapt 03/2008 02510-6 of 9 7 7 7 CITY OF PEARLAND WATER MAINS to existing main. Provide 2-inch valves when indicated on Plans for 2-inch 7 copper gooseneck connections. 3.04 CUT,PLUG AND ABANDONMENT OF MAINS 7 A Materials: 1. Concrete for thrust blocks: Class B conforming to requirements of Section 03305. 7 2. Plugs and clamps shall be suitable for type of pipe to be plugged. B Execution r1. Do not begin cut,plug and abandonment operations until replacement main has been constructed, disinfected, and tested, and all service lines have been transferred to replacement main. 7 2. Install plug, clamp,and concrete thrust block and make cut at location shown on Plans. 3. Main to be abandoned shall not be valved off and shall not be cut or plugged 7 other than at supply main or as shown on Plans. 4. After main to be abandoned has been cut and plugged,check for other sources feeding abandoned main. If sources are found,notify Engineer immediately. 7 Cut and plug abandoned main at point of other feed as directed by Engineer. 5. Plug or cap all ends or openings in abandoned main in an acceptable manner approved by Engineer. 7 6. Remove and dispose of all surface identifications such as valve boxes and fire hydrants. Valve boxes in improved streets,other than shell,may be poured full of concrete after removing cap. 7 7. Backfill all excavations in accordance with Section 02318 —Excavation and Backfill for Utilities. 8. Repair all street surfaces in accordance with Section 02980—Pavement Repair. 7 3.05 HYDROSTATIC TESTING A Hydrostatically test all new water pipelines for liquids before connecting to water Cdistribution system. B Pipelines shall be tested in lengths between valves, or plugs, of not more than 1,500 Cfeet unless greater length is approved by Engineer. C Conduct hydrostatic tests in presence of Engineer in accordance with requirements of 7 this Section. D Preparation: 7 1. Disinfect water system pipelines prior to hydrostatic testing. E Test Procedures: 7 1. Furnish,install,and operate connections,pump,meter and gages necessary for hydrostatic testing. 2. Allow pipeline to sit minimum of 24 hours from time it is initially disinfected until testing begins, to allow pipe wall or lining material to absorb water. 7 03/2008 02510-7 of 9 7 CITY OF PEARLAND WATER MAINS Contractor should be aware that periods of up to 7 days may be required for mortar lining to become saturated. 3. Expel all air and apply a minimum test pressure of 125 psi or 150 psi as 7 directed by Engineer. 4. Maintain test pressure for 8 hours. If a large quantity of water is required to ,..� maintain pressure during test,testing shall be discontinued until cause of water loss is identified and corrected. ^p F Allowable Leakage for Water Mains: 1. During hydrostatic tests,no leakage will be allowed for sections of water mains consisting of welded joints. 2. Maximum allowable leakage for water mains with rubber gasketed joints: 11.65 gallons per inch nominal diameter per mile of pipe per 24 hours while testing at the required pressure. G Correction for Failed Tests: 1. Repair all joints showing visible leaks on surface regardless of total leakage shown on test. Check all valves and fittings to ensure that no leakage occurs that could affect or invalidate test. Remove any cracked or defective pipes, 1 fittings and valves discovered during pressure test and replace with new items. 2. Repeat test until satisfactory results are obtained. 3.06 DISINFECTION 7 A All waterlines constructed shall be promptly disinfected before any tests are conducted on waterlines and before waterlines are connected to water distribution system. B Water for disinfection and flushing will be furnished without charge to Contractor. C Preparation: 1. Furnish all required temporary blind flanges,cast-iron sleeves,plugs,and other items needed to facilitate disinfection of new mains prior to connecting them to water distribution system. Normally,each valved section of waterline requires two each 3/4-inch taps. A 2-inch minimum blow-off is required for waterlines up to and including 6-inch diameter. 2. Fire hydrants shall be used as blow-offs to flush newly constructed waterlines 8-inch diameter and above. Where fire hydrants are not available on waterlines, locations and designs for blow-offs shall be as indicated on Plans. Install temporary blow-off valves and remove promptly upon successful completion of disinfection and testing. Abandon tap by use of a full circle stainless steel clamp. 3. Slowly fill each section of pipe with water in a manner approved by Engineer. Average water velocity when filling pipeline should be less than 1 fps and shall not, under any circumstance, exceed 2 fps. Before beginning disinfection operations, expel all air from pipeline. 4. All excavations made shall be backfilled immediately after installation of risers or blow-offs. 03/2008 02510-8 of 9 CITY OF PEARLAND WATER MAINS 5. Install blow-off valves at end of main to facilitate flushing at all dead-end water mains. Install permanent blow-off valves as per drawing. D Disinfection: 1. Use not less than 100 parts of chlorine per million parts of water. Introduce chlorinating material to water lines in accordance with AWWA C651. After contact period of not less than 24 hours, flush system with clean water until residual chlorine is no greater than 1.0 parts per million parts of water. Open and close valves in lines being sterilized several times during contact period. 2. If a chemical compound is used for a sterilizing agent, it shall be placed in pipes as directed by Engineer. E Bacteriological Testing: 1. After disinfection and flushing of waterlines, bacteriological tests will be performed by Owner or testing laboratory in accordance with Section.01450— Testing Laboratory Services. If test results indicate need for additional disinfection of waterlines based upon Texas Department of Health requirements,Contractor shall perform additional disinfection operations at no additional cost to the Owner. F Completion: E. 1. Upon completion of disinfection and testing, remove risers except those approved for use in subsequent hydrostatic testing, and backfill excavation promptly. END OF SECTION L 03/2008 02510-9 of 9 7 CITY OF PEARLAND AUGERING PIPE OR CASING FOR WATER LINES 7 Section 02417 7 AUGERING PIPE OR CASING FOR WATER LINES 1.0 GENERAL 7 1.01 SECTION INCLUDES 7 A Installation of pipe and casing for water lines by methods of augering. B References to Technical Specifications: 1. Section 01570—Trench Safety System 7 2. Section 01200—Measurement and Payment Procedures 3. Section 01350—Submittals 4. Section 01500—Temporary Facilities and Controls 7 5. Section 02635—Steel Pipe and Fittings 6. Section 02318—Excavation and Backfill for Utilities 7. Section 01140—Contractor's Use of Premises 7 C Referenced Standards: 1. American Association of State Highway and Transportation Officials i (AASHTO) 1.02 MEASUREMENT AND PAYMENT UNIT PRICES 7 A Measurement for augered casing with water pipe will be on a linear foot basis measured from end to end of the casing. CB Payment of augered casing with water pipe will be full compensation for all labor, equipment,casing,water pipe,materials and supervision for construction complete in L place including dewatering,augering,joints,spoil removal,pipe installation,grouting, utility adjustments,testing,and cleanup,and other work necessary for construction as shown on the Plans and as specified. [IN C Measurement of augered water pipe will be on a linear foot basis along the axis of the pipe from auger pit to auger pit. CD Payment of augered water pipe will be full compensation for labor,pipe,equipment, materials, and supervision for construction complete in place including dewatering, jacking,utility adjustments,testing,cleanup,and other work necessary for construction 7 as shown on the Plans and as specified. E No separate payment will be made for auger pits and other excavations under this C section. Include cost of excavation, surface restoration, pavement repair, etc., for auger pits or observation pits in Sections related to the open-cut utility installation portion of the Work. Include cost of trench safety for auger pits or observation pits in 7 Section 01570—Trench Safety Systems. F Refer to Section 01200 -Measurement and Payment Procedures. 7 02/2008 02417-1 of 6 7 CITY OF PEARLAND AUGERING PIPE OR CASING FOR WATER LINES "l 1.03 SUBMITTALS A Submit product data in accordance with requirements of Section 01350-Submittals. i 1 B Submit product data for casing insulators for approval. C Prior to commencement of work,furnish for the Engineer's approval, a plan showing pit locations. Approval of this plan will not relieve Contractor from responsibility to obtain specified results. fl D Show actual pit locations dimensioned on as-built drawings so that they can be identified in field. 1.04 REGULATORY REQUIREMENTS A Conform to Texas Department of Transportation for installations under state highways. I Owner will obtain required permits for State Highway crossings. City will make submittal to TxDOT. Contractor will supply Traffic Control Plans. B Installations under railroads: 1. Secure and comply with requirements of right-of-entry for crossing railroad company's easement or right-of-way from railroad companies affected. Comply with railroad permit requirements. Submit copy to the Engineer. 2. Use dry auger method only. 3. No extra compensation for damages due to delays caused by the railroad 7] requesting work to be done at hours which will not inconvenience the railroad. 4. Maintain minimum 35-foot clearance from centerline of tracks. 1.05 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices described in Section 01500—Temporary Facilities and Controls. 1.06 CRITERIA FOR DETERMINING INSTALLATION LOADS 7] A Pipes and casings shall be selected by the Contractor to carry overburden pressure and ...I applicable surcharge and installation loads. B The criteria to be used for truck loading shall be HS-20 vehicle loading distributions in accordance with AASHTO. 1 C The Contractor shall be responsible for the selection of the casing,pipe,and pipe joints to carry the thrust of the jacks or loads due to the pulling mechanism. 7 D The Contractor shall select the diameter of the casing to meet the minimum dimensions defined in the Plans, and to permit practical installation(including skids, pipe spiders and shims, if applicable) and grouting, where required. ``l 02/2008 02417-2 of 6 7 1 7 CITY OF PEARLAND AUGERING PIPE OR CASING FOR WATER LINES 7 2.0 PRODUCTS 7 2.01 MATERIALS A Piping and Fittings: As required by Plans. 7 B Casings: Where required by Plans,in accordance with Section 02635-Steel Pipe and Fittings. 7 C Insulators: Where casings are required by Plans, casing insulator width 8 inches for pipe sizes 4 to 14 inches; 12 inches for pipe sizes 16 to 30 inches. C 1. For welded steel pipe 12 inches and smaller, use Pipeline Seal & Insulator Model PE, or approved equal. 2. For other pipe materials, use Pipeline. Seal & Insulator Model C8G-2 or 7 approved equal for pipe sizes up to 12 inches. 3. For all pipe sizes above 12 inches, use Pipeline Seal & Insulator Model C12G-2 or approved equal. 7 D Casing End Seals: Provide Pipeline Seal &Insulator Model C or approved equal. 3.0 EXECUTION 7 3.01 GENERAL 7 A Do not exceed 100 feet for length of auger hole for uncased PVC pipe less than 12 inches in diameter without intermediate pit. B Do not exceed 75 feet for length of auger hole for uncased PVC pipe 12 inches to 16 7 inches in diameter without intermediate pit. C Do not exceed 80 feet for length of auger hole for uncased PVC pipe greater than 16- 7 inches in diameter without intermediate pit. 3.02 PREPARATION CA Secure right-of-entry for crossing railroad company's easement or right-of-way. 7 3.03 JACKING A Comply with Section 01570 - Trench Safety Systems for all pits, access shafts, end 7 trenches and other excavations relating to work required by this specification. B If grade of pipe at jacking end is below ground surface, excavate suitable pits or trenches for conducting jacking operations and for placing end joints of pipe. 7 Wherever end trenches are cut in sides of embankment or beyond it, sheath securely and brace such work to prevent earth caving. EC No more than one joint shall be made-up in pit or trench prior to jacking. 7 02/2008 02417-3 of 6 7 CITY OF PEARLAND AUGERING PIPE OR CASING FOR WATER LINES D Construction shall not interfere with operation of railroad, street, highway, or other facility, nor weaken or damage embankment or structure. E During construction operations,furnish and maintain barricades and lights to safeguard traffic and pedestrians as directed by the Engineer,until such time as backfill has been completed and removed from site. F Provide heavy-duty jacks suitable for forcing pipe through embankment. Use suitable jacking head, usually of timber, and suitable bracing between jacks and jacking head and suitable jacking frame or backstop so that jacking pressure will be applied to pipe uniformly around ring of pipe. Set pipe to be jacked on guides, properly braced together, to support section of pipe and to direct it in proper line and grade. Place jacking assembly in line with direction and grade of pipe. Excavate embankment material just ahead of pipe and remove material through pipe. Force pipe through embankment with jacks,into space thus provided. G Conform excavation for underside of pipe to contour and grade of pipe,for at least one third of circumference of pipe. Provide clearance of not more than 2 inches for upper half of pipe. Taper off upper clearance to zero at point where excavation conforms to contour of pipe. H Distance that excavation shall extend beyond end of pipe depends on character of material,but it shall not exceed 2 feet in any case. Decrease distance on instructions from the Engineer,if character of material being excavated makes it desirable to keep advance excavation closer to end of pipe. I Jack pipe from low or downstream end. Lateral or vertical variation in final position +� of pipe from line and grade established by the Engineer will be permitted only to extent of 1 inch in 10 feet, provided such variation is regular and only in one direction and that final grade of flow line is in direction indicated on plans. 7 J Use cutting edge of steel plate around head end of pipe extending short distance beyond end of pipe with inside angles or lugs to keep cutting edge from slipping back onto pipe. K Once jacking of pipe is begun, carry on without interruption to prevent pipe from becoming firmly set in embankment. L Remove and replace any pipe damaged in jacking operations. M Backfill pits or trenches excavated to facilitate jacking operations immediately after completion of jacking of pipe. N Grout annular space when loss of embankment occurs or when clearance of two inches is exceeded. fl 02/2008 02417-4 of 6 CITY OF PEARLAND AUGERING PIPE OR CASING FOR WATER LINES 3.04 AUGERING(BORI NG) NG) A Auger from approved pit locations. Excavate for pits and install shoring as outlined above under "Jacking." Auger mechanically with use of a pilot hole entire length of crossing and check for line and grade on opposite end of bore from work pit. The large hole is to be no more than 2 inches larger than diameter of bell. Place excavated (— material outside working pit and dispose of as required. Use water or other fluids in connection with boring operation only to lubricate cuttings; jetting will not be rpermitted. B In unconsolidated soil formations, a gel-forming colloidal drilling fluid may be used. Fluid is to consist of at least 10 percent of high-grade processed bentonite and shall consolidate cuttings of bit, seal walls of hole, and shall furnish lubrication for subsequent removal of cuttings and installation of pipe. 3.05 PIPE IN CASING A Pipes shall be installed in augered casings in accordance with this Section, as applicable. B Bottom of trench adjacent to each end of casing should be graded to provide firm, uniform, and continuous support for carrier pipe. If trench requires some backfill to establish final trench bottom grade, backfill material should be placed in 6-inch lifts and each layer properly compacted. C Install casing end seals in accordance with manufactures specifications. 3.06 INSULATOR INSTALLATION A Casing spacers and/or insulators should be installed in accordance with manufacturer's instructions. Special care should be taken to ensure that all subcomponents are correctly assembled and evenly tightened,and that no damage occurs during tightening or carrier pipe insertion. B Spacing of spacers or insulators should ensure that carrier pipe is adequately supported throughout its length, particularly at ends, to offset settling and possible electrical shorting. End spacer must be within 6 inches of end of casing pipe,regardless of size of casing and carrier pipe or type of spacer used. Casing spacers are designed to withstand much greater loads than can be safely applied to most coatings. Therefore, spacing between spacers depends largely on load bearing capabilities of pipe coating and flexibility of pipe. 1. Spacing shall be as shown on Plans with maximum distance between spacers to be 10 feet for pipe sizes 4 to 14 inches and 8 feet for pipe sizes 16 to 30 inches. 2. For ductile iron pipe, flanged pipe, or bell-and-spigot pipe, spacers should be installed within one foot on each side of bell or flange and one in center of joint when 18-to 20-foot-long joints are used. 3. If casing or carrier pipe is angled,bent, or dented, spacing should be reduced. 02/2008 02417-5 of 6 1 CITY OF PEARLAND AUGERING PIPE OR CASING FOR WATER LINES C Where metallic carrier pipe is to be placed in metallic casing, provide electric insulating type spacers to ensure no contact between carrier pipe and casing. 3.07 FILLING ANNULAR SPACE A Allowable variation from line and grade shall be as specified under"Jacking." Block 1 void space around pipe in augered hole with approximately 12 inches of packed clay or similar material approved by the Engineer,to prevent bedding or backfill from entering the void around the pipe in the angered hole when compacted. For pipe diameters 4 inches through 8 inches use minimum 1/2 cubic foot clay for pipe diameters 12 inches through 16 inches use minimum 3/4 cubic foot clay. 3.08 AUGER PITS A Locate auger pits where there is minimum interference with traffic or access to property. B Pit Size: Provide minimum 6-inch space between pipe and walls of bore pit. I Maximum allowable width of pit shall be 5 feet unless approved by the Engineer. Width of pit at surface shall not be less than at bottom. Maximum allowable length of pit shall be no more than 5 feet longer than one full joint of pipe and shall not exceed 25 feet unless approved by the Engineer. C Excavate bore pits to finished grade at least 6 inches lower than grade indicated by •-y stakes or as approved by the Engineer. JI D Backfill in accordance with Section 02318 -Excavation and Backfill for Utilities. 3.09 CLEAN UP AND RESTORATION A Perform clean up and restoration in and around construction zone in accordance with Section 01140-Contractor's Use of Premises. 3.10 PROTECTION OF THE WORK 1 A Protect and maintain all pipe and casing angering in good condition until completion of Work. I END OF SECTION 1 7 02/2008 02417-6 of 6 7 CITY OF PEARLAND GRAVITY SANITARY SEWERS Section 02530 GRAVITY SANITARY SEWERS 1.0 GENERAL 1.01 SECTION INCLUDES A Gravity sanitary sewers and appurtenances, including cleanouts, stacks, service connections, and reconnections. B References to Technical Specifications: 1. Section 02415—Augering Pipe or Casing for Sewers 2. Section 01200—Measurement and Payment Procedures 3. Section 01350—Submittals 4. Section 01450—Testing Laboratory Services 5. Section 01500—Temporary Facilities and Controls 6. Section 01570—Trench Safety System 7. Section 02318—Excavation and Backfill for Utilities 8. Section 01564—Control of Ground Water and Surface Water 9. Section 02220—Site Demolition 10. Section 01140- Contractor's Use of Premises C Reference Standards: fl 1. American Society for Testing and Materials (ASTM) a. ASTM D 1784,"Standard Specification for Rigid Poly Vinyl Chloride (PVC) Compounds and Chlorinated Poly Vinyl Chloride (CPVC) Compounds" b. ASTM F 477,"Standard Specification for Elastomeric Seals(Gaskets) for Joining Plastic Pipe" c. ASTM D 3034, "Standard Specification for Type PSM Poly Vinyl Chloride(PVC) Sewer Pipe and Fittings" d. ASTM F 679, "Standard Specification for Poly Vinyl Chloride(PVC) Large-Diameter Plastic Gravity Sewer Pipe and Fittings" e. ASTM F 949, "Standard Specification for Poly Vinyl Chloride(PVC) Corrugated Sewer Pipe with a Smooth Interior and Fittings" f. ASTM D 794,"Standard Specification for Poly Vinyl Chloride(PVC) Profile Gravity Sewer Pipe and Fittings Based on Controlled Inside Diameter" g. ASTM D 2241,"Standard Specification for Poly Vinyl Chloride(PVC) Pressure-Rated Pipe (SDR Series)" h. ASTM D 3212,"Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals" i. ASTM D 3139, "Standard Specification for Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals" j. ASTM D 2444, "Standard Test Method for Determination for the Impact Resistance of Thermoplastic Pipe and Fittings by Means of a Tup (Falling Weight)" 02/2008 02530- 1 of 20 CITY OF PEARLAND GRAVITY SANITARY SEWERS k. ASTM F 714, "Standard Specification for Polyethylene (PE) Plastic Pipe (SDR-PR)Based on Outside Diameter" 1. ASTM D 2657, "Standard Practice for Heat Fusion Joining and Polyolefin Pipe and Fittings" m. ASTM D 1248, "Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and Cable" n. ASTM D 3350, "Standard Specification for Polyethylene Plastic Pipe and Fittings Materials" o. ASTM D 3681, "Standard Test Method for Chemical Resistance of Fiberglass (Glass-Fiber Reinforced Thermosetting-Resin) Pipe in a Deflected Condition" p. ASTM D 4161, "Standard Specification for Fiberglass (Glass-Fiber- Reinforced Thermosetting-Resin) Pipe Joints Using Flexible Elastomeric Seals" q. ASTM D 3262, "Standard Specification for Fiberglass (Glass-Fiber- Reinforced Thermosetting-Resin)Sewer Pipe" r. ASTM D 3754, "Standard Specification for Fiberglass (Glass-Fiber- Reinforced Thermosetting-Resin)Sewer and Industrial Pressure Pipe" s. ASTM D 618, "Standard Practice for Conditioning Plastics for Testing" t. ASTM C 828, "Standard Test Method for Low-Pressure Air Test of Vitrified Clay Pipe Lines" u. ASTM C 924, "Standard Practice for Testing Concrete Pipe Sewer Lines by Low-Pressure Air Test Method" v. ASTM F 1417, "Standard Test Method for Installation Acceptance of Plastic Gravity Sewer Lines Using Low-Pressure Air" 2. American Water Works Association (AWWA) a. AWWA C 900 Polyvinyl Chloride(PVC)Pressure Pipe,4"—12"for Water Distribution b. AWWA C 905 Polyvinyl Chloride (PVC) Water Transmission Pipe, Nominal Diameters, 14in. Through 36 in. 3. Plastic Pipe Institute (PPI) a. PPI TR3,"Policies and Procedures for Developing Hydrostatic Design Basis (HDB), Pressure Design Basis (PDB), Strength Design Basis (SDB), and Minimum Required Strength (MRS) Ratings for Thermoplastic Piping Materials or Pipe" 4. Texas Commission on Environmental Quality(TCEQ) 5. Texas Administrative Code (TAC) ! 1.02 MEASUREMENT AND PAYMENT A Measurement of pipe installed at depths 8-feet and less by open cut method is on a linear foot basis, measured and complete in place. Measurement will be taken along the center line of the pipe from center line to center line.of manholes,except for pipe in casing or augered installation. B Payment includes sewer excavatio n,on, bedding, backfill and special backfill, shoring, earthwork, connections to existing manholes and pipe, stacks, cleanouts, 02/2008 02530-2 of 20 i CITY OF PEARLAND GRAVITY SANITARY SEWERS accessories, inspection and testing. Depths beyond 8' will be paid by 2 vertical feet increments. C Refer to Section 02415—Augering Pipe or Casing for Sewers for measurement and payment of augered sewer pipe. D Refer to Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS '" A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit inspection reports,testing reports, and video tape of television inspections as directed by Engineer. C Submit proposed methods, equipment, materials and sequence of operations for Gravity Sanitary Sewer construction. Plan operations to minimize disruption of utilities to occupied facilities or adjacent property. 1.04 QUALITY ASSURANCE A Qualifications. Gravity Sanitary Sewer shall be watertight both in pipe-to-pipe joints and in pipe-to-manhole connections. Perform testing in accordance with this Section and Section 01450—Testing Laboratory Services. B Regulatory Requirements. 1. Install Gravity Sanitary Sewer to meet the minimum separation distance from any potable water line,as scheduled below. The separation distance is defined as the distance between the outside of the water pipe and the outside of the sewer pipe. When possible, install new Gravity Sanitary Sewers no closer to water lines than 9 feet in all directions. Where this separation distance cannot be achieved,new Gravity Sanitary Sewers shall be installed as specified in this Section. 2. Make notification to the Engineer if water lines are uncovered during Gravity Sanitary Sewer installation where the minimum separation distance cannot be maintained. 3. Lay Gravity Sanitary Sewers lines in straight alignment and grade. 1.05 PROTECTION OF PEOPLE AND PROPERTY 7 A Contractor shall conduct all construction operations under this Contract in 1 conformance with the practices described in Section 01500—Temporary Facilities and Controls. J 1.06 PRODUCT DELIVERY, STORAGE AND HANDLING A Inspect pipe and fittings upon arrival of materials at the Project Site. 02/2008 02530-3 of 20 7 CITY OF PEARLAND GRAVITY SANITARY SEWERS B Handle and store pipe materials and fittings to protect them from damage due to impact, shock, shear, or free fall. Do not drag pipe and fittings along the ground. Do not roll pipe unrestrained from delivery trucks. Use mechanical means to move or handle pipe. Employ acceptable clamps,rope or slings around the outside barrel of pipe and fittings. Do not use hooks,bars, or other devices in contact with the interior surface of the pipe to lift or move lined pipe 2.0 PRODUCTS 2.01 GASKET MATERIAL FOR USE IN POTENTIALLY CONTAMINATED AREAS A Gravity Sanitary Sewer pipes to be installed in potentially contaminated areas, especially where free product is found near the elevation of the proposed sewer, shall have the following Gasket Material for the noted contaminants: CONTAMINANT GASKET MATERIAL REQUIRED Petroleum(diesel, gasoline) Nitrile Rubber Other contaminants As recommended by the pipe manufacturer 2.02 PO LYVINYL CHLORIDE (PVC)PIPE A Use PVC compounds in the manufacture of pipe that contain no ingredient in an amount that has been demonstrated to migrate into water in quantities considered to be toxic. CB Furnish PVC pressure pipe manufactured from Class 12454-A or Class 12454-B virgin PVC compounds as defined in ASTM D 1784. Use compounds qualifying for a rating of 4000 psi for water at 73.4°F per requirements of PPI TR3. Provide pipe which is homogeneous throughout,free of voids,cracks,inclusions,and other defects,uniform as commercially practical in color,density,and other physical properties. Deliver pipe with surfaces free from nicks and scratches with joining surfaces of spigots and joints free from gouges and imperfections which could cause leakage. C Gaskets: 1. Gaskets shall meet the requirements of ASTM F477. When no contaminant is identified,use elastomeric factory-installed gaskets to make joints flexible and watertight. D Lubricant for rubber-gasketed joints: Water soluble,non-toxic, non-objectionable in taste and odor imparted to fluid, non-supporting of bacteria growth, having no deteriorating effect on PVC or rubber gaskets. 7. 02/2008 02530-4 of 20 T CITY OF PEARLAND GRAVITY SANITARY SEWERS E PVC Gravity Sanitary Sewer pipe shall be in accordance with the provisions in the following table: WALL PRODUCT ASTM SDR(MAX.)/ DIAMETER MANUFACTURER STIFFNESS SIZE TYPE OPTIONS DESIGNATION (MIN.) RANGE Solid J-M Pipe Approved D 3034 SDR 26/PS 115 6" to 10" CertainTeed Can-Tex Approved D 3034 SDR 35/PS 46 12" &15" Diamond n Approved F 679 SDR 35/PS 46 18" to 27" Approved AWWA C900 DR 18/N/A 4" to 12" Approved AWWA C905 DR 18/N/A 14" to 36" Profile Contech A-2000* Only when F 949 N/A/50 psi 12" to 36" ETI Ultra-Rib included in F 794 N/A/46 psi 12" to 48" the Bid Lamson Vylon Schedule F 794 N/A/46 psi 21" to 48" * Allowed to be used to a maximum depth of 10' only. F When solid wall PVC pipe 18 inches to 27 inches in diameter is required in SDR 26, provide pipe conforming to ASTM F 679, except provide wall thickness as required 7 for SDR 26 and pipe strength of 115 psi. G For Gravity Sanitary Sewers up to 12 inch diameter crossing over waterlines, or crossing under waterlines with less than 2 feet separation, provide minimum 150 psi pressure-rated pipe conforming to ASTM D 2241 with suitable PVC adapter couplings. H Joints: Spigot and integral wall section bell with solid cross section elastometric or rubber ring gasket conforming to requirements of ASTM D 3212 and ASTM F 477,or 7 ASTM D 3139 and ASTM F 477, shall be provided. Gaskets shall be factory- assembled and securely bonded in place to prevent displacement. The manufacturer shall test a sample from each batch conforming to requirements ASTM D 2444. Fittings: Provide PVC gravity sanitary sewer bends, tee, or wye fittings for new sanitary sewer construction. PVC pipe fittings shall be full-bodied, either injection molded or factory fabricated. Saddle-type tees, wye fittings, or solvent welds are not acceptable. 2.03 HIGH DENSITY POLYETHYLENE(HDPE)SOLID AND PROFILE WALL PIPE A Provide IMPE pipe as follows and only when listed as a Bid Item: 7 WALL PRODUCT ASTM PIPE DIAMETER TYPE MANUFACTURER OPTIONS DESIGNATION STIFFNESS RANGE (MIN) (INCHES) Solid Wall Drisco 1000 Drisco 8600 Approved F 714 115 psi 8 to 10 Quail Pipe Poly Pipe 02/2008 02530-5 of 20 7 • CITY OF PEARLAND GRAVITY SANITARY SEWERS 7 II Plexco I I I B Solid wall pipe shall be produced with plain end construction for heat joining (butt 7 fusion)conforming to ASTM D 2657. Utilize controlled temperatures and pressures for joining to produce a fused leak-free joint. C C Pipe and Fittings:g High density, high molecular weight polyethylene pipe material 7 meeting the requirements of Type III, Class C, Category 5, Grade P34, as defined in ASTM D 1248. Material meeting the requirements of cell classification in accordance with ASTM D 3350 are also suitable for making pipe products under these specifications. 7 D Gaskets: 1. Use gaskets meeting requirement of ASTM F 477. Use gasket molded into a 7 circular form or extruded to the proper section and then spliced into circular form. When no contaminant is identified, use gaskets-of a properly cured, high-grade elastomeric compound. The basic polymer shall be natural rubber, 7 synthetic elastomer, or a blend of both. E Lubricant. Use a lubricant for assembly of gasketed joints which has no detrimental effect on the gasket or on the pipe, in accordance with manufacturer's 7 recommendations. F Furnish pipe and fittings that are homogeneous throughout and free from visible 7 cracks,holes,foreign inclusions,or other injurious defects. Provide pipe as uniform as commercially practical in color, opacity, density, and other physical properties. 2.04 CENTRIFUGALLY CAST FIBERGLASS PIPE 7 A Manufacturers C 1. Pre-approved manufacturer for centrifugally cast fiberglass pipe is Hobas Pipe USA,Inc. 7B Materials 1. Resin Systems: The manufacturer shall use only polyester resin systems with a proven history of performance in this particular application. The historical data 7 shall have been collected from applications of a composite material of similar construction and composition as the proposed product. 2. Glass Reinforcements: The reinforcing glass fibers used to manufacture the 7 components shall be of highest quality commercial grade glass filaments with binder and sizing compatible with impregnating resins. 3. Fillers: Silica sand or other suitable materials may be used. 4. Additives: Resin additives,such as pigments,dyes,and other coloring agents, 7 if used, shall in no way be detrimental to the performance of the product nor shall they impair visual inspection of the finished products. 5. Rubber Gaskets: Supply from an approved gasket manufacturer in accordance with ASTM F 477, when no contaminant is identified and suitable for the 7 service intended. Gaskets shall either be affixed to the pipe by means of a 7 02/2008 02530-6 of 20 7 fwl CITY OF PEARLAND GRAVITY SANITARY SEWERS suitable adhesive or shall be installed in such a manner so as to prevent the gasket from rolling out of the pre-cut groove in the pipe or sleeve coupling. 6. The internal liner resin shall be suitable for service as sewer pipe,and shall be highly resistant to exposure to sulfuric acid as produced by biological activity from hydrogen sulfide gases. Pipe shall meet or exceed requirements of ASTM D 3681. j C Pipes 1. Furnish pipes in the diameters specified and within the tolerances specified below. 2. Manufacture pipe by the centrifugal casting process to result in a dense, nonporous, corrosion-resistant, consistent composite structure to meet the operating conditions as shown on the Plans. 3. Do not use stiffening ribs or rings. 71 D Couplings: Unless otherwise specified, the p pipe shall be field connected with fiberglass sleeve couplings that utilize elastomeric sealing gaskets as the sole means to maintain joint watertightness. The joints must meet the performance requirements of ASTM D 4161. E Fittings: Flanges, elbows, reducers, tees, and other fittings shall be capable of AI° withstanding operating conditions when installed. They may be contact molded or manufactured from mitered sections of pipe joined by glass fiber reinforced overlays. F Manhole Connections: Provide a water stop flange (wall pipe) for connection to a cast-in-place manhole base or other structure. 71 G Grout Ports: Provide grout ports in the wall of pipe when required. Provide plugs of 316 stainless steel or other corrosion-resistant material compatible with the pipe. Grout port plugs shall be designed and installed to meet the test pressure of the pipe. H Dimensions 1 1. Diameters:The actual outside diameter of the pipes shall be in accordance with Table 3 of ASTM D 3262 for Gravity Sanitary Sewers, or ASTM D 3754 for force mains. 2. Lengths: The pipe standard length will be approximately 20 feet. A maximum of 10 percent of the lengths,excluding special order pipes,maybe supplied in random lengths. 3. Wall Thickness: The minimum average wall thickness shall be the stated design thickness. The minimum single point thickness shall not be less than 90 percent of the stated design thickness. 4. End Squareness: Pipe ends shall be square to the pipe axis. 5. Tolerance of Fittings: The tolerance of the angle of an elbow and the angle between the main and leg of a wye or tee shall be plus or minus 2 degrees. The tolerance on the laying length of a fitting shall be plus or minus 2 inches. 7 Stiffness Classes 02/2008 02530-7of20 1 _ J E 7 CITY OF PEARLAND GRAVITY SANITARY SEWERS 1. Stiffness class of FRP pipe shall satisfy design requirements,but shall not be 7 less than 46 psi, when used in direct bury operation; 36 psi, when installed within a primary tunnel liner. 2. Stiffness class of FRP in a pipe jacking operation shall be governed either by 7 the ring deflection limitations or by a pipe design providing longitudinal = strength required by the jacking method and shall satisfy design requirements stated below. Submit design calculations as required in Paragraph 1.05, L9 Submittals. ' a. Pipe stress calculations based on jacking loads shall be provided by the pipe supplier. 7 b. Ring deflection calculations shall conform to design requirements of 30 TAC Chapter 317.20 pertaining to flexible pipe used in Gravity Sanitary Sewers. The pipe deflection calculations shall ensure that [7 predicted deflection will be less than 5 percent under long-term loading conditions (soil prism load)for the highest density of soil overburden and surcharge loads. Deflection on calculations shall be prepared using 7long-term (drained) values for soil parameters contained in the geotechnical investigation report for the Project, or other site-specific data obtained by the Contractor as approved by the Engineer. LJ Testing 1. Pipes shall be tested in accordance with ASTM D 3262 or ASTM D 3754,as 7 applicable, except that the factory hydrostatic pressure testing is not required. 2. Joints: Coupling joints shall be qualified per the tests of Section 7 of ASTM D 4161. 7 K Packaging, Handling, and Shipping 1. Packing, handling, and shipping should be done in accordance with the manufacturer's recommendations. 7 L Installation 7 1. 'Install pipe and fittings in accordance with requirements of this Section. 2. The manufacturer must supply a suitable qualified field service representative — to be present periodically during the installation of pipe. 3. Pipe Bedding: Conform to requirements of Section 02318 —Excavation and 7 4. Backfill for Utilities. = Pipe Handling: Use textile slings. 5. Jointing a. Clean ends of pipe and coupling components. El b. Check pipe ends and couplings for damage. Correct any damage found. ' c. Coupling grooves must be completely free of dirt. d. Apply joint lubricant to pipe ends and rubber seals of coupling. Use only lubricants approved by the pipe manufacturer. 7 e. Use suitable auxiliary equipment, such as a wire rope puller, to pull joints together. 7 02/2008 02530-8 of 20 E • CITY OF PEARLAND GRAVITY SANITARY SEWERS f. Do not exceed forces recommended by the manufacturer for coupling pipe. If excessive force is required,remove coupling,determine source of problem, and correct it. - g. In the process of jointing the pipe, do not allow the deflection angle to exceed the deflection permitted by the manufacturer. 6. If pressure grouting of the pipe is conducted as part of a pipe jacked tunnel installation,seal the grout holes with liner resin to a thickness equal to the pipe liner thickness, or with a threaded plug for that purpose. 7. Tests: Conform to requirements of this Section. - 2.05 INSPECTIONS 7 1 A The Engineer reserves the right to inspect pipes or witness pipe manufacturing. Such inspection shall in no way relieve the manufacturer of the responsibilities to provide products that comply with the applicable standards and these Specifications. B Manufacturer's Notification to Customer. Should the Engineer wish to witness the r� manufacture of specific pipes, the manufacturer shall provide the Engineer with adequate advance notice of when and where the production of those specific pipes will take place. C Failure to Inspect. Approval of the products or tests is not implied by the Engineer's decision not to inspect the manufacturing, testing, or finished pipes. 2.06 TEST METHODS A Conditioning. Conditioning of samples prior to and during tests are subject to approval by the Engineer. When referee tests are required,condition the specimens in accordance with Procedure A in ASTM D 618 at 73.4 degrees F plus or minus 3.6 degrees F(23 degrees C plus or minus 2 degrees C)and 50 percent relative humidity fl plus or minus 5 percent relative humidity for not less than 40 hours prior to test. Conduct tests under the same conditions of temperature and humidity unless otherwise specified. '"i 1 B Flattening. Flatten three specimens of pipe, prepared in accordance with Paragraph 2.05A,in a suitable press until the internal diameter has been reduced to 40 percent of the original inside diameter of the pipe. The rate of loading shall be uniform and at 2- inches per minute. The test specimens, when examined under normal light and with the unaided eye,shall show no evidence of splitting,cracking,breaking,or separation of the pipe walls or bracing profiles. C Joint Tightness. Test for joint tightness in accordance with ASTM D 3212, except replace the shear load transfer bars and supports with 6 inch wide support blocks that can be either flat or contoured to conform to the pipe's outer contour. D Purpose of Tests. The flattening and the joint tightness tests are not intended to be 1 routine quality control tests, but rather to qualify pipe to a specified level of performance. 02/2008 02530-9 of 20 7 CITY OF PEARLAND GRAVITY SANITARY SEWERS 2.07 MARKING A Mark each standard and random length of pipe in compliance with these Specifications with the following information: 1. Pipe size 2. Pipe class 3. Production code 4. Material designation 3.0 EXECUTION 3.01 PREPARATION A Employ a Trench Safety Plan as specified in Section 01570—Trench Safety Systems. B Install and operate dewatering and surface water control measures in accordance with Section 01564- Control of Ground Water and Surface Water. C Remove existing pavements and structures, including sidewalks and driveways, in conformance with requirements of Section 02220—Site Demolition, as applicable. 3.02 DIVERSION PUMPING A Install and operate required bulkheads,. plugs, piping, and diversion pumping equipment to maintain sewage flow and to prevent backup or overflow. Obtain approval for diversion pumping equipment and procedures from the Engineer. B Design piping,joints and accessories to withstand twice the maximum system pressure or 50 psi,whichever is greater. C No sewage shall be diverted into any area outside of the sanitary sewer. D In the event of accidental spill or overflow, immediately stop the overflow and take action to clean up and disinfect spillage. Promptly notify the Engineer so that required reporting can be made to the TCEQ and the Environmental Protection Agency by the Engineer. 3.03 INSPECTION AND TESTING A Acceptance testing of sanitary sewers including:1. Visual inspection of sewer pipes 2. Mandrel testing for flexible sewer pipes. 3. Leakage testing of sewer pipes. 4. Leakage testing of manholes. B Performance Requirements: 1. Gravity sanitary sewers are required to have a straight alignment and uniform grade between manholes. 7 02/2008 02530- 10 of 20 J CITY OF PEARLAND GRAVITY SANITARY SEWERS fl 2. Flexible pipe,including"semi-rigid"pipe,is required to show no more than 5 percent deflection. Test pipe no sooner than 30 days after backfilling of a line segment but prior to final acceptance using a standard mandrel to verify that installed pipe is within specified deflection tolerances. 3. Maximum allowable leakage for Infiltration or Exfiltration a. The total exfiltration,as determined by a hydrostatic head test,shall not exceed 50 gallons per inch diameter per mile of pipe per 24 hours at a minimum test head of 2 feet above the crown of the pipe at the upstream manhole or 2 feet above the groundwater elevation, whichever is greater. b. When pipes are installed more than 2 feet below the groundwater level, an infiltration test shall be used in lieu of the exfiltration test. The total infiltration shall not exceed 50 gallons per inch diameter per mile of pipe per 24 hours. Groundwater elevation must be at least 2 feet above the crown of the pipe at the upstream manhole. c. Refer to Table 2530-1,Water Test Allowable Leakage,at the end of the Section, for measuring leakage in sewers. Perform leakage testing to verify that leakage criteria are met. 4. Perform air testing in accordance with requirements of this Section and the Texas Natural Resources Conservation Commission requirements. Refer to ``j Table 02530-2, Time Allowed For Pressure Loss From 3.5 psig to 2.5 psig, Table 02530-3,Minimum Testing Times for Low Pressure Air Test,and Table 02530-4, Vacuum Test Time Table, at the end of this Section. 7 C Gravity Sanitary Sewer Quality Assurance: 1. Repair, correct, and retest manholes or sections of pipe which fail to meet 7 specified requirements when tested. 2. Provide testing reports and video tape of television inspection as directed by Engineer. ,.., 3. Upon completion of tape reviews by Engineer, Contractor will be notified regarding final acceptance of the sewer segment. D Sequencing and Scheduling: fl 1. Perform testing as work progresses. Schedule testing so that no more than 1000 linear feet of installed sewer remains untested at any one time. 2. Coordinate testing schedules with Engineer. Perform testing under observation of Engineer. E Deflection Mandrel: 7 1. Mandrel Sizing. The rigid mandrel shall have an outside diameter(O.D.)equal to 95 percent of the inside diameter(I.D.) of the pipe. The inside diameter of the pipe, for the purpose of determining the outside diameter of the mandrel, shall be the average outside diameter minus two minimum wall thicknesses for O.D. controlled pipe and the average inside diameter for I.D. controlled pipe, dimensions shall be per appropriate standard. Statistical or other "tolerance 7 packages" shall not be considered in mandrel sizing. 2. Mandrel Design. The rigid mandrel shall be constructed of a metal or a rigid plastic material that can withstand 200 psi without being deformed. The 02/2008 02530- 11 of 20 r CITY OF PEARLAND GRAVITY SANITARY SEWERS mandrel shall have nine or more"runners"or"legs"as long as the total number of legs is an odd number. The barrel section of the mandrel shall have a length of at least 75 percent of the inside diameter of the pipe. The rigid mandrel shall not have adjustable or collapsible legs which would allow a reduction in mandrel diameter during testing. A proving ring shall be provided and used for modifying each size mandrel. 3. Proving Ring. Furnish a"proving ring"with each mandrel. Fabricate the ring of 1/2 inch thick, 3-inch-wide bar steel to a diameter 0.02 inches larger than approved mandrel diameter. 4. Mandrel Dimensions (5 percent allowance). Average inside diameter and minimum mandrel diameter are specified in Table 02530-5,Pipe vs.Mandrel Diameter,at the end of this Section. Mandrels for higher strength,thicker wall pipe or other pipe not listed in the table may be used when approved by the Engineer. F Exfiltration Test: 1. Water Meter: Obtain a transient water meter from the City for use when water for testing will be taken from the City system. Conform to City requirements for water meter use. 2. Test Equipment: a. Pipe plugs. b. Pipe risers where the manhole cone is less than 2 feet above highest point in pipe or service lead. G Infiltration Test: 1. Test Equipment: a. Calibrated 90 degree V-notch weir. L b. Pipe plugs. H Low Pressure Air Test: 1. Minimum Requirement for Equipment: a. Control panel. b. Low-pressure air supply connected to control panel. c. Pneumatic plugs: Acceptable size for diameter of pipe to be tested; capable of withstanding internal test pressure without leaking or requiring external bracing. d. Air hoses from control panel to: 1) Air supply. 2) Pneumatic plugs. 3) Sealed line for pressuring. 4) Sealed line for monitoring internal pressure. 2. Testing Pneumatic Plugs: Place a pneumatic plug in each end of a length of pipe on the ground. Pressurize plugs to 25 psig;then pressurize sealed pipe to 5 psig. Plugs are acceptable if they remain in place against the test pressure without external aids. I Ground Water Determination: 02/2008 02530- 12 of 20 1 CITY OF PEARLAND GRAVITY SANITARY SEWERS 1. Equipment: Pipe probe or small diameter casing for ground water elevation determination. 7 J Visual Inspection: 1. Check pipe alignment visually by flashing a light between structures. Verify if alignment is true and no pipes are misplaced. In case of misalignment or damaged pipe,remove and re-lay or replace pipe segment. K Mandrel Testing: 1. Perform deflection testing on flexible and semi-rigid pipe to confirm pipe has no more than 5 percent deflection. Mandrel testing shall conform to ASTM D 3034. Perform testing no sooner than 30 days after backfilling of line segment, but prior to final acceptance testing of the line segment. 2. Pull the approved mandrel by hand through sewer sections. Replace any section of sewer not passing the mandrel. Mandrel testing is not required for stubs. 3. Retest repaired or replaced sewer sections. 1 L Leakage Testing: 1. Test Options: a. Test Gravity Sanitary Sewer pipes for leakage by either exfiltration or infiltration methods, as appropriate, or with low pressure air testing. -- b. Test new or rehabilitated sanitary sewer manholes with water or low 7 pressure air. Manholes tested with low pressure air shall undergo a physical inspection prior to testing. c. Leakage testing shall be performed after backfilling of a line segment, and prior to tie-in of service connections. d. If no installed piezometer is within 500 feet of the sewer segment, Contractor shall provide a temporary piezometer for this purpose. 2. Compensating for Ground Water Pressure: a. Where ground water exists,install a pipe nipple at the same time sewer line is placed. Use a 1/2-inch capped pipe nipple approximately 10 inches long. Make the installation through manhole wall on top of the sewer line where line enters manhole. b. Immediately before performing line acceptance test,remove cap,clear r, pipe nipple with air pressure,and connect a clear plastic tube to nipple. Support tube vertically and allow water to rise in the tube. After water stops rising, measure height in feet of water over invert of the pipe. Divide this height by 2.3 feet/psi to determine the ground water pressure to be used in line testing. 3. Exfiltration test: a. Determine ground water elevation. 7 b. Plug sewer in downstream manhole. c. Plug incoming pipes in upstream manhole. d. Install riser pipe in outgoing pipe of upstream manhole if highest point in service lead (house service) is less than 2 feet below bottom of manhole cone. 02/2008 02530- 13 of 20 i E CITY OF PEARLAIVD GRAVITY SANITARY SEWERS e. Fill sewer pipe and manhole or pipe riser,if used,with water to a point 2-1/2 feet above highest point in sewer pipe, house lead, or ground water table, whichever is highest. f. Allow water to stabilize for one to two hours. Take water level reading to determine drop of water surface,in inches, over a one-hour period, and calculate water loss (1 inch of water in 4 feet diameter manhole equals 8.22 gallons)or measure the quantity of water required to keep water at same level. Loss shall not exceed that calculated from allowable leakage according to Table 02530-1 at the end of this Section. 4. Infiltration test: Ground water elevation must be not less than 2.0 feet above highest point of sewer pipe or service lead(house service). a. Determine ground water elevation. b. Plug incoming pipes in upstream manhole. c. Insert calibrated 90 degree V-notch weir in pipe on downstream manhole. d. Allow water to rise and flow over weir until it stabilizes. e. Take five readings of accumulated volume over a period of 2 hours and use average for infiltration. The average must not exceed that calculated for 2 hours from allowable leakage according to the Table 02530-1 at the end of this Section. 5. Low Air Pressure Test: When using this test conform to ASTM C 828,ASTM C 924, or ASTM F 1417, as applicable, with holding time not less than that listed in Table 02530-2. a. Air testing for sections of pipe shall be limited to lines less than 36- inch average inside diameter. b. Lines 36-inch average inside diameter and larger shall be tested at each joint. The minimum time allowable for the pressure to drop from 3.5 pounds per square inch gauge to 2.5 pounds per square inch during a joint test shall be 10 seconds,regardless of pipe size. c. For pipe sections less than 36-inch average inside diameter: 1) Determine ground water level. 2) Plug both ends of pipe. For concrete pipe, flood pipe and allow 2 hours to saturate concrete. Then drain and plug concrete pipe. 3) After a manhole-to-manhole section of sanitary sewer main has been sliplined and prior to any service lines being connected to new liner, plug liner at each manhole with pneumatic plugs. 4) • Pressurize pipe to 4.0 psig. Increase pressure 1.0 psi for each 2.3 feet of ground water over highest point in system. Allow pressure to stabilize for 2 to 4 minutes. Adjust pressure to start at 3.5 psig (plus adjustment for ground water table). Refer to Table 02530-2 at the end of this Section. 5) To determine air loss, measure the time interval for pressure to drop to 2.5 psig. The time must exceed that 02/2008 02530- 14 of 20 r CITY OF PEARLAND GRAVITY SANITARY SEWERS listed in the Table 02530-2 at the end of this Section for pipe diameter and length. For sliplining, use diameter of carrier pipe. 6. Retest: Any section of pipe which fails to meet requirements shall be repaired and retested. M Test Criteria Tables 1. Exfiltration and Infiltration Water Tests: Refer to Table 02530-1,Water Test 7 Allowable Leakage, at the end of this Section. 2. Low Pressure Air Test: a. Times in Table 02530-2, Time Allowed For Pressure Loss From 3.5 psig to 2.5 psig, at the end of this Section, are based on the equation from TCEQ Design Criteria for Sewerage Systems: 317.2(a)(4)(B). T= 0.0850(D)(K)/(Q) Where: T = Time for pressure to drop 1.0 pounds per square inch gauge in seconds K = 0.000419 DL, but not less than 1.0 D = Average inside diameter in inches L = Length of line of same pipe size in feet Q = Rate of loss, 0.0015 ft3/min./sq. ft. internal surface b. Since a K value of less than 1.0 shall not be used, there are minimum testing times for each pipe diameter as given in Table 02732-3,Minimum Testing Times for Low Pressure Air Test. 1 Notes: 1. When two sizes of pipe are involved, the time shall be computed by the ratio of lengths involved. 2. Line with a 27-inch average inside diameter and larger may be air tested at each joint. 3. Lines with an average inside diameter greater than 36 inches must be air tested for leakage at each joint 4. If the joint test is used, a visual inspection of the joint shall be performed immediately after testing. 5. For joint test, the pipe is to be pressurized to 3.5 psi greater than the pressure exerted by groundwater above the pipe. Once the pressure has stabilized, the minimum times allowable for the pressure to drop from 3.5 pounds per square inch gauge to 2.5 pounds per square inch gauge shall be 10 seconds. 7 N Leakage Testing for Manholes 02/2008 02530- 15 of 20 ^7 CITY OF PEARLAND GRAVITY SANITARY SEWERS 1. After completion of manhole construction, wall sealing, or rehabilitation,but prior to backfilling, test manholes for water tightness using hydrostatic or vacuum testing procedures. 2. Plug influent and effluent lines, including service lines, with suitably-sized pneumatic or mechanical plugs. Ensure plugs are properly rated for pressures required for test; follow manufacturer's safety and installation recommendations. Place plugs a minimum of 6 inches outside of manhole walls. Brace inverts to prevent lines from being dislodged if lines entering manhole have not been backfilled. 3. Vacuum testing: a. Install vacuum tester head assembly at top access point of manhole and adjust for proper seal on straight top section of manhole structure. Following manufacturer's instructions and safety precautions,inflate sealing element to the recommended maximum L inflation pressure; do not over-inflate. b. Evacuate manhole with vacuum pump to 10 inches mercury(Hg), disconnect pump, and monitor vacuum for the time period specified in Table 02530-4, Vacuum Test Time Table. c. If the drop in vacuum exceeds 1 inch Hg over the specified time period tabulated above,locate leaks,complete repairs necessary to seal manhole and repeat test procedure until satisfactory results are obtained. 4. Hydrostatic exfiltration testing shall be performed as follows: a. Seal wastewater lines coming into the manhole with an internal pipe plug. Then fill the manhole with water and maintain it full for at least one hour. b. The maximum leakage for hydrostatic testing shall be 0.025 gallons L per foot diameter per foot of manhole depth per hour. c. If water loss exceeds amount tabulated above, locate leaks, complete repairs necessary to seal manhole and repeat test procedure until satisfactory results are obtained. 3.04 BACKI'ILL A Backfill and compact soil in accordance with Section 02318—Excavation and Backfill for Utilities. B Backfill the trench in specified lifts only after pipe installation is approved by the Engineer. 3.05 CLEAN UP AND RESTORATION S ORATION A Perform clean up and restoration in and around construction zone in accordance with Section 01140-Contractor's Use of Premises. 02/2008 02530-16 of 20 7 CITY OF PEARLAND GRAVITY SANITARY SEWERS 71 1 3.06 PROTECTION OF THE WORK '"1 A Maintain gravity sanitary sewer installations in good condition until completion of the 1 work. 7 Table 02530-1 WATER TEST ALLOWABLE LEAKAGE 1 i 1 DIAMETER OF VOLUME PER INCH OF DEPTH ALLOWANCE LEAKAGE* RISER OR STACK IN INCHES INCH GALLONS PIPE SIZE IN GALLONS/MINUTE7 INCHES PER 100 FT. 1 0.7854 .0034 6 0.0039 2 3.1416 .0136 8 0.0053 7 2.5 4.9087 .0212 10 0.0066 3 7.0686 .0306 12 0.0079 7 4 12.5664 .0306 15 0.0099 5 19.6350 .0544 18 0.0118 1 6 28.2743 .1224 21 0.0138 8 50.2655 .2176 24 0.0518 7 27 0.0177 30 0.0197 1 36 0.0237 42 0.0276 For other diameters, multiply square of diameters by Equivalent to 50 gallons per inch value for 1"diameter inside diameter per mile per 24 hours 1 * Allowable leakage rate shall be reduced to 10 gallons per inch of inside diameter per mile per 24 hours, when sewer is identified as located within the 25-year flood plain. ``1 i 71 7 1 7 02/2008 02530- 17 of 20 i 7 1 7 7 CITY OF PEARLAND GRAVITY SANITARY SEWERS 7 Table 02530-2 ACCEPTANCE TESTING FOR SANITARY SEWERS 7 TIME ALLOWED FOR PRESSURE LOSS FROM 3.5 PSIG TO 2.5 PSIG Pipe Min. Length Time for g Longer Specification Time for Length(L)Shown(min:sec) Diam Time for Min. 7 (in) (min:sec) Time(ft) Length (sec) 100 ft 150 ft 200 ft 250 ft 300 ft 350 ft 400 ft 450 ft 500 ft 550 ft 600 ft 6 5:40 398 0.8548 5:40 5:40 5:40 5:40 5:40 5:40 5:42 6:25 7:07 7:50 8:33 8 7:33 298 1.5196 7:33 7:33 7:33 7:33 7:36 8:52 10:08 11:24 12:40 13:36 15:12 7 10 9:27 239 2.3743 9:27 9:27 9:27 9:54 11:52 13:51 15:50 17:48 19:47 21:46 23:45 12 11:20 -199 3.4190 11:20 11:20 11:20 14:15 17:06 19:57 22:48 25:39 28:30 31:20 34:11 15 14:10 159 5.3423 14:10 14:10 17:48 22:16 26:43 31:10 35:37 40:04 44:31 48:58 53:25 7 18 17:00 133 7.6928 17:00 19:14 25:39 32:03 38:28 44:52 51:17 57:42 64:06 70:31 76:56 21 19:50 114 10.4708 19:50 26:11 34:54 43:38 52:21 61:05 69:48 78:32 87:15 95:59 104:42 r 24 22:40 99 13.6762 22:48 34:11 45:35 56:59 68:23 79:47 91:10 102:34 113:58 125:22 136:46 { 27 25:30 88 17.3089 28:51 43:16 57:42 72:07 86:33 100:58 115:24 129:49 144:14 158:40 173:05 ((("` 30 28:20 80 21.3690 35:37 53:37 71:14 89:02 106:51 124:39 142:28 160:16 178:05 195:53 213:41 33 31:10 72 25.8565 43:06 64:38 86:11 107:44 129:17 150:50 172:23 193:55 215:28 237:01 258:34 7 7 Table 02530-3 MINIMUM TESTING TIMES FOR LOW PRESSURE AIR TEST 7 PIPE MINIMUM LENGTH FOR TIME FOR DIAMETER TIME MINIMUM TIME LONGER LENGTH (INCHES) (SECONDS) (FEET) (SECONDS) 7 6 340 398 0.855 (L) 7. 8 454 298 1.520 (L) 10 567 239 2.374(L) 12 680 199 3.419 (L) 7 15 850 159 5.342 (L) 18 1020 133 7.693 (L) 21 1190 114 10.471 (L) rill 24 1360 100 13.676(L) 27 1530 88 17.309 (L) 30 1700 80 21.369 (L) C33 1870 72 25.856 (L) 7 7 02/2008 02530- 18 of 20 7 CITY OF PEARLAND GRAVITY SANITARY SEWERS Table 02530-4 1 VACUUM TEST TIME TABLE TIME IN SECONDS BY PIPE DIAMETER DEPTH IN FEET 48" 60" 72" 4 10 13 16 "•I 8 20 26 32 12 30 39 48 16 40 52 64 20 50 65 80 fl 24 60 78 96 * 5.0 6.5 8.0 *Add T times for each additional 2-foot depth. (The values listed above have been extrapolated from ASTM C 924-85) 1 ; 1 fl 1 02/2008 T 02530- 19 of 20 C 7 CITY OF PEARLAND GRAVITY SANITARY SEWERS 7 Table 02530-5 PIPE VS. MANDREL DIAMETER 7 NOMINAL AVERAGE MATERIAL AND SIZE I.D. MINIMUM MANDREL WALL CONSTRUCTION (INCHES) (INCHES) DIAMETER(INCHES) 7 PVC-Solid(SDR 26) 6 5.764 5.476 8 7715 7329 10 9.646 9 162 PVC-Solid(SDR 35) 12 11.737 11.150 7 15 14.374 13.655 18 17.629 16.748 21 20.783 19.744 24 23.381 22.120 27 26.351 25.033 7 PVC-Profile(ASTM F 794) 12 11.740 11.153 15 14.370 13.652 ���www 18 17.650 16.768 l 21 20.750 19.713 L 24 23.500 22.325 27 26.500 25.175 30 29.500 28.025 36 35.500 33.725 7 42 41.500 39.425 48 47.500 45.125 HDPE-Profile 18 18.000 17.100 21 21.000 19.950 E 24 24.000 22.800 27 27.000 25.650 30 30.000 28.500 7 36 36.000 34.200 42 42.000 39.900 48 48.000 45.600 54 54.000 51.300 60 60.000 57.000 7 Fiberglass-Centrifugally Cast 12 12.85 11.822 (Class SN 46) 18 18.66 17.727 7 20 20.68 19.646 24 24.72 23.484 30 30.68 29.146 36 36.74 34.903 42 42.70 40.565 7 48 48.76 46.322 54 54.82 52.079 60 60.38 57.361 C • 7 END OF SECTION 7 CO2/2008 02530-20 of 20 7 E CITY OF PEARLAND VALVE BOXES,METER BOXES, AND METER VAULTS Section 02520 VALVE BOXES,METER BOXES,AND METER VAULTS 1.0 GENERAL E1.01 SECTION INCLUDES A Valve boxes for water service. B Meter boxes for water service. C Meter vaults for water service. D References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 03300—Cast-in-Place Concrete 4. Section 02542—Concrete Manholes and Accessories 5. Section 02318—Excavation and Backfill for Utilities 6. Section 01140—Contractor's Use of Premises 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item, no separate payment will be made for valve boxes under this Section.Include cost in Bid Items for which this Work is a component. L B No separate payment will be made for installation of meter boxes furnished by the Owner under this Section. Include cost of installation of meter boxes in Bid Items for which the Work is a component. C Measurement for installation of meter vaults is on a per each basis for each meter vault type and size,complete in place. Payment includes all labor and materials required to complete installation as indicated on Plans. D Refer to Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit manufacturers product data for following items for approval: 1. Each type of valve box and lid. 2. Each type of meter box and cover. 3. Each type of meter vault frame and cover. • 02/2008 02520- 1 of 4 CITY OF PEARLAND VALVE BOXES,METER BOXES, 7 AND METER VAULTS C Submit Shop Drawings for cast-in-place meter vaults for approval if proposed construction varies from Plans. D Submit manufacturer's certification that meter boxes purchased for Work meet the requirements of this Section. 2.0 PRODUCTS 2.01 VALVE BOXES A Provide adjustable, cast-iron, screw-type, valve boxes as manufactured by Bass and j Hays Foundry,Inc.,or approved equal. Design of valve box shall minimize stresses on valve imposed by loads on box lid. B Cast the word "WATER"into lid, 1/2 inch in height and raised 3/32 inch,for valves serving potable water lines. C Coat boxes, bases, and lids by dipping in hot bituminous varnish. D Provide 6-inch PVC, Class 150, DR 18,riser pipes. �? E Concrete for valve box placement: 1. For locations in new concrete pavement, use strength and mix design of new ^� pavement. 1 2. For other locations, use class "A" concrete, with minimum compressive strength of 3000 psi,conforming to requirements of Section 03300—Cast-in- Place Concrete. 2.02 METER BOXES A Refer to City of Pearland Standard Details or contact the Public Works Department for list of acceptable materials. 2.03 METER VAULTS A Meter vaults may be constructed of precast concrete, cast-in-place concrete, or solid masonry unless a specific type of construction is required by Plans. B Concrete for meter vaults: Class A concrete, conforming to requirements of Section 7 03300—Cast-in-Place Concrete,with minimum compressive strength of 4000 psi at 28 days. C Reinforcing steel for meter vaults: Conform to requirements of Section 03300—Cast- in-Place Concrete. 1. Grates and Covers: Conform to requirements of Section 02542 Concrete Manholes and Accessories. 02/2008 T 02520-2 of 4 7 CITY OF PEARLAND VALVE BOXES,METER BOXES, AND METER VAULTS 3.0 EXECUTION 3.01 EXAMINATION A Obtain approval from the Engineer for location of meter vault. B Verify lines and grades are correct. C Verify compacted subgrade will support loads imposed by vaults. 3.02 VALVE BOXES A Provide riser pipe with suitable length for depth of cover indicated on Plans or to accommodate actual finish grade. B Install adjustable valve box and riser piping plumbed in a vertical position. Provide 6 inches telescoping freeboard space between riser pipe top butt end,and interior contact flange of valve box,for vertical movement damping. Riser may rest on valve flange, or provide suitable footpiece to support riser pipe. C Paint covers of new valve boxes as directed by the Owner. 3.03 METER BOXES A Install plastic boxes in accordance with manufacturer's instructions. B Construct concrete meter boxes to dimensions shown on Plans. C Adjust top of meter boxes to conform to cover elevations specified in this Section, 3.05 "Frame and Cover for Meter Vaults". D Do no t locate under paved areas unless approved by Engineer. Use approved traffic- type box with cast iron lid when meter must be located in paved areas. 3.04 METER VAULTS A Construct concrete meter vaults to dimensions and requirements shown on Plans. Do not cast in presence of water. Make bottom as uniform as practicable. B Precast Meter Vaults: 1. Install precast vaults in accordance with manufacturer's recommendations. Set level on a minimum 3 inch thick bed of sand conforming to the requirements of Section 02318—Excavation and Backfill for Utilities. 2. Seal lifting holes cement-sand mortar or non-shrink grout. C Meter Vault Floor Slab: 1. Construct floor slabs of 6-inch-thick reinforced concrete. Slope floor 1/4 inch per foot toward sump. Make sump 12 inches in diameter,or 12 inches square, and 4 inches deep, unless other dimensions are required by Plans. Install C 02/2008 02520-3 of 4 CITY OF PEARLAND VALVE BOXES,METER BOXES, AND METER VAULTS dowels at maximum of 18 inches,center-to-center,or install mortar trench for keying walls to floor slab. 2. Precast floor slab elements may be used for precast vault construction. D Cast-in-Place Meter Vault Walls: 1. Key walls to floor slab and form to dimensions shown on Plans. Minimum wall thickness shall be 4 inches. 2. Cast walls monolithically. One cold joint will be allowed when vault depth exceeds 12 Feet. 3. Set frame for cover while concrete is still green. 3.05 FRAME AND COVER FOR METER VAULTS A Diamond Plate Aluminum as follows: 1. In unpaved areas,set top of meter box or meter vault cover 2 to 3 inches above natural grade. 2. In sidewalk areas,set top of meter box or meter vault cover 1/2 to 1 inch above adjacent concrete. 3.06 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises 7 B Backfill and compact in accordance with Section 02318—Excavation and Backfill for Utilities. C In unpaved areas, slope backfill around meter boxes and vaults to provide a uniform slope 1 to 5 from top to natural grade. D In sidewalk areas slope concrete down from meter boxes to meet adjacent concrete. END OF SECTION 71 fl 02/2008 02520-4 of 4 n CITY OF PEARLAND FIRE HYDRANT ASSEMBLY Section 02514 1 FIRE HYDRANT ASSEMBLY 1.0 GENERAL 1.01 SECTION INCLUDES A Fire hydrants. 7 B References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 02634—Ductile Iron Pipe and Fittings 4. Section 02635—Steel Pipe and Fittings `� 5. Section 02534—PVC Pipe 1 6. Section 02510—Water Mains C Referenced Standards: 1. National Fire Protection Association (NFPA) 2. American Water Works Association (AWWA) —i 3. American National Standards Institute (ANSI) 4. National Association of Corrosion Engineers (NACE) 5. Food and Drug Administration (FDA) 6. Steel Structures Painting Council (SSPC) 7. Texas Commission on Environmental Quality(TCEQ) 8. National Sanitation Foundation (NSF) 1.02 MEASUREMENT AND PAYMENT A Measurement for installation of fire hydrants is on a per each basis, complete in place. Payment includes all valves, fittings, bedding, backfill, and thrust blocking required for the installation of the fire hydrant assembly. B If fire hydrant leads are included as a Bid Item,measurement will be on a linear foot basis. Separate payment will be made for open cut and augered leads. C Measurement for removing and salvaging of fire hydrants is on a per each basis. 1 Payment includes removing hydrant and valve if available, plugging lead, and removing materials from site or returning salvaged fire hydrants to Owner. 1 D Refer to Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS 1 A Make Submittals required by this Section under the provisions of Section 01350— Submittals. 07/2006 j 02514-1of7 7 CITY OF PEARLAND FIRE HYDRANT ASSEMBLY 1. Shop drawing(s)for proposed hydrant:Include model number,parts list,and material specifications, unique drawing number and descriptive legend identifying hydrant. 2. Material safety data sheets for lubricants. 3. Affidavit of compliance for coating materials. 4. Certified hydraulic performance test report for proposed hydrant. 2.0 PRODUCTS t-' 2.01 HYDRANT MATERIALS A Hydrants: AWWA C502; dry barrel design; tamper resistant; same manufacturer throughout project. 1. 0-Ring Seal Packing: 'Prevent water leakage between barrel and lubrication chamber. Provide dynamic seals of Buna "N" or other oil resistant material and static seals of Buna "N" or other approved synthetic rubber. 2. Bronze: Hydrant components in waterway to contain not more than 15 percent zinc and not more than 8 percent lead. 3. Acceptable Manufacturer:Mueller Super Centurian 250,American Darling B-84-B, Clow Medallion,or East Jordan Iron Works WaterMaster 5CD250. B Operating Stems: Everdur,or other high-quality non-corrodible metal where threads are located in barrel or waterway. Bronze-to-bronze working parts in waterway; genuine wrought iron or steel where threads are not located in barrel or waterway, bronze bushed at penetration of stuffing box;seal threads against contact with water regardless of open or closed position of main valve. Connect operating stems with breakable coupling. C Main Valve(shut-off valve): Circular;compression-type; ) compression type;closes with line pressure; minimum opening of 5-1/4 inches in diameter. Seal bottom end of stem threads from contact with water with cap nut. D Valve Mechanism: Bronze valve seat ring threaded into bronze drain ring;seat ring and main valve assembly removable from above ground through upper barrel with lightweight seat removal wrench; breakable stem coupling opposite barrel breakaway;bronze or corrosion-resistant pins and locking devices;bronze valve stem sleeve, 0-ring seals and travel stop; sealed lubricating reservoir at top and bottom which fully lubricates threads and bearing surfaces when opening or closing main valve;thrust bearing or lubricated thrust collar for operating assembly. Lubricants: Food Grade.Valve Seat: Molded"Natural"rubber;scale durometer rating of 90±5; minimum thickness of 1/2 inch. Natural Rubbers: Resistant to microbiological attack. E Lower Hydrant Barrel: Single piece coupled to upper barrel to allow 360°rotation of upper barrel. Bury Length: Distance from bottom of inlet to ground line as specified. Ground Line: Clearly marked on barrel. Indicate inside diameter and wall thickness (with tolerances)for upper barrel,lower barrel, and bonnet sections. 07/2006 02514-2 of 7 CITY OF PEARLAND FIRE HYDRANT ASSEMBLY Show dimensions at minimum sections to demonstrate compliance with Paragraph , 3.2.6 of AWWA C502. F Extensions: Permit use of one or more standard extensions available from manufacturer in lengths from 6 inches to 60 inches in 6 inch increments. G Provide hydrants with automatic,positively operating,non-corrodible drain or drip valve to drain hydrant completely when main valve is shut. Bronze or corrosion resistant drain line. Tapping of drain holes is not required. H Inlet Connection: Elbow with AWWA Standard bell designed for 6-inch mechanical joint, or push-on. Joints: ANSI A21.11;AWWA C111. I Operating Nut and Hold-down Nuts: Stainless steel or cast or ductile iron with bronze inserts or,as an alternative,provide security device with bronze operating nut. Any such security devices shall not require special tools for normal off/on operation of hydrant. Fabricate hold-down assemblies of suitable metallic materials for service intended. rl J Field-Replaceable Nozzles: NFPA No. 194,ANSI B26-1925;mechanically attached to hydrant body counterclockwise;sealed with 0-rings and mechanically located into ^'+ place; provide two hose nozzles with 2-1/2 inch nominal inside diameter and one pumper nozzle with 4.492"nominal inside diameter;National Standard Threads;lock in place with security device. 7 K Pumper Nozzle: Allow a minimum unobstructed radius of 10 inches from threaded surface of nozzle throughout path of travel of wrench or other device used to fasten hose to nozzle. L Nozzle Caps: Security chains to hydrant barrel, minimum 1/8 inch diameter; "Natural" rubber or neoprene gasket seals. M Hydrant shoe with 6-inch cast or ductile-iron pipe diameter inlet,flanged, swivel or slip joint with harnessing lugs for restrained joints. Underground flanging shall incorporate minimum of six,full,3/4-inch diameter electro-galvanized or cadmium coated steel bolts or four 5/8-inch diameter stainless or cadmium coated steel bolts. N Provide traffic model hydrants equipped with safety flange on hydrant barrel and stem. Equip body of hydrant with breakable flange,or breakable bolts,above finish grade. 0 Lubricants: Food grade oil or grease meeting requirements of FDA 21CFR178.3570 and manufactured with FDA approved oxidation inhibitors. 07/2006 02514-3 of 7 E CITY OF PEARLAND FIRE HYDRANT ASSEMBLY P Hydrant Painting: 1. COLOR CODE(BONNETS) MAIN SIZE 6" and less Gloss White Code No 225A120 8" Safety Orange Code No 225A122 10" and 12" John Deere Green Code No 225A133 r 16' and 20" John Deere Yellow Code No 225A138 22" and up Safety Red Code No 225A123 2. COLOR CODE Fire Hydrant Barrel Safety Blue Code No 225A120 Fire Hydrant Caps (SAME AS BONNET COLOR) Q. Shop coated as follows: 1. Exterior Above Traffic Flange (including bolts and nuts) a. Surface Preparation:SSPC-SP 10(NACE 2);near white blast cleaned surface. b. Coat with a three (3) coat alkyd/alkyd/silicone alkyd system with a total dry film.thickness (DFT) of 6 - 9 mils as follows: 1) Prime Coat: Oil Modified Alkyd Primer, Acro Products No. 1104,Heavy Duty Tank&Steel Primer,or approved equal; SSPC Paint Specification No. 25. Total dry film thickness (DFT): 2- 3 mils. 2) Intermediate Coat: Heavy Duty Industrial Alkyd Enamel, Acro Products No.2214, or approved equal; SSPC Paint Specification No. 104;Federal Standard FF-E-489. Total dry film thickness (DFT): 2-3 mils. 3) Finish Coat:Silicone Alkyd Resin Enamel,Acro Products No. 2215 or approved equal; SSPC Paint Specification No. 21. Total dry film thickness (DFT): 2 - 3 mils. Exception:hydrant bonnet shall not be finish shop coated - only intermediate coated. Finish coating shall be field applied and color coded when installed. 4) Colors: Primer: Manufacturers standard color. Finish coat of hydrant body: Blue (Acro 555 crystal blue or equivalent). Base connection caps: Finish coated white; paint white band of finish coat two inches(2")in width on hydrant body approximately six inches (6")above traffic flange and parallel thereto. Intermediate coat: Contrasting color to blue finish color, such as white. 2. Exterior Below Traffic Flange: a. Surface Preparation:SSPC-SP 10(NACE 2);near white blast cleaned surface. 07/2006 02514-4 of 7 CITY OF PEARLAND FIRE HYDRANT ASSEMBLY f 1 b. Coat with a three (3) coat system as follows: 1) Primer and Intermediate Coat: Cal tar epoxy, Acro Products No. 4467, or approved equal; SSPC Paint Specification No. 16. Apply two(2)coats with a dry film thickness (DFT) of 8 - 10 mils each for a total dry film thickness (DFT) of 16 - 20 mils. 2) Finish Coat: Water based vinyl acrylic mastic, Acro Products No. 7782, or approved equal. Apply one (1) coat with a dry film thickness (DFT)of 6- 8 mils. Finish J{ coat color: Same as finish coat for exterior above traffic flange, i.e. blue (Acro 555 crystal blue or equivalent). 3. Interior Surfaces Above and Below Main Valve: a. All materials used for internal coating of hydrant interior ferrous surfaces must conform to ANSI/NSF Standard 61 as suitable for contact with potable water as required by TCEQ, Chapter 290, Subchapter D: Rules and Regulations for Public Water Systems. b. Surface Preparation:SSPC-SP 10(NACE 2);near white blast cleaned surfaces. c. Coating: Liquid or powder epoxy system; AWWA Standard C550, latest revision. Coating may be applied in two(2) or three(3)coats, according to manufacturers recommendations, for a total dry film thickness (DFT) of 12- 18 mils. 4. General Coating Requirements: a. Coatings: Applied in strict accordance with manufacturer's recommendations. No requirements of this specification shall cancel or supersede written directions and recommendations of specific manufacturer so as to jeopardize integrity of applied system. b. Hydrant supplier shall furnish an affidavit of compliance that all materials and work furnished complies with requirements of this specification and applicable standards referenced herein. 2.02 HYDRANT PERFORMANCE STANDARDS A , Hydraulic Performance Standards: 1. Provide hydrants capable of a free discharge of 1500 gpm or greater from single pumper nozzle at a hydrant inlet static pressure not exceeding 20 PSIG as measured at or corrected to hydrant inlet at its centerline elevation. 2. Provide hydrants capable of a discharge of 1500 gpm or greater from single pumper nozzle at a maximum permissible head loss of 8.0 psig (when corrected for inlet and outlet velocity head)for an inlet operating pressure not exceeding 37 psig as measured at or corrected to hydrant inlet at its centerline elevation. B Hydraulic Performance Testing: AWWA C502;conduct certified pressure loss and quantity of flow test by qualified testing laboratory on production model(5-foot bury fl length)of hydrant(same catalog number)proposed for certification. Submit certified test report containing following information: 7 07/2006 02514-5 of 7 7 7 CITY OF PEARLAND FIRE HYDRANT ASSEMBLY 7 1. Date of test, no more than five years prior to date of proposed use, on fire hydrant with similar hydraulic characteristics. 7 2. Name, catalog number, place of manufacture, and date of production of hydrant(s)tested. 3. Schematic drawing of testing apparatus, containing dimensions of piping 7 elements including: a. Inside diameter and length of inlet piping. b. Distance from flow measuring points to pressure measurement point. 7 c. Distance from flow and pressure monitoring points to hydrant inlet. d. Distance from pressure monitoring point to nozzles. e. Inside diameter and length of discharge tubing. C4. Elevation of points of measurement, inlet, and reports, or certificates documenting accuracy of measuring devices used in test. 5. Conduct test on at least three separate hydrants of same fabrication design. 7 Inlet water temperature: 70°F±5° F. C Provide hydrants equipped with breakable barrel feature and breakable valve stem 7 coupling such that vehicular impact will result in clean and complete break of barrel and valve stem at breakable feature. Provide hydrant shutoff valve which remains closed and tight against leakage upon impact. C2.03 LEADS A Branches (Leads): Conform to requirements of Section 02634—Ductile-Iron Pipe 7and Fittings,Section 02635—Steel Pipe and Fittings,and Section 02534—PVC Pipe. 3.0 EXECUTION 7 3.01 INSTALLATION 7 A Set fire hydrant plumb and brace at locations and grades as shown on Plans. When barrel of hydrant passes through concrete slab, place a piece of standard sidewalk expansion joint material, 3/ inch thick, around section of barrel passing through Cconcrete. B Locate nozzle centerline minimum 18 inches above finish grade. CC Place 12-inch x 12-inch yellow indicators (plastic, sheet metal, plywood, or other material approved by Engineer)on pumper nozzles of new or relocated fire hydrants installed on new mains not in service. Remove indicators after new main is tested 7 and approved by Engineer. D Do not cover drain ports when placing concrete thrust block. CE Lubricate hydrants with food grade oil or with grease meeting requirements of FDA 21CFR178.3570 and manufactured with FDA approved oxidation inhibitors. 7 7 07/2006 02514-6 of 7 7 CITY OF PEARLAND FIRE HYDRANT ASSEMBLY A-, F Accomplish replenishment of lubricant for hydrant working g parts without removing hydrant bonnet. Store lubricant system in reservoir. Lubricate bearing surfaces and working parts during normal operation of fire hydrant. G All changes in profile from approved plans due to obstructions not shown on plans which require a change in depth of bury of fire hydrant shall be approved in writing by Engineer for design prior to installation of hydrant. Any adjustment required in flow line of water main or to barrel length of fire hydrant shall be incidental to unit price of fire hydrant and no separate payment shall be made for such adjustments. H Remove and dispose of or salvage fire hydrants shown on Plans. I Owner may, at any time prior to or during installation of hydrants for a specific project, randomly select a furnished hydrant for disassembly and laboratory inspection,at Owner's expense,to verify compliance with Owner's requirements. If such hydrant is found to be non-compliant,replace at Contractor's expense, all or a portion of furnished hydrants with hydrants that comply with Owner's requirements. J Install leads in accordance with Section 02510—Water Mains. END OF SECTION I 7 7 07/2006 02514-7 of 7 CITY OF PEARLAND POLYETHYLENE WRAP 7 Section 02512 POLYETHYLENE WRAP 1.0 GENERAL 1.01 SECTION NCLUDES A Polyethylene wrap for cast and ductile iron pipe to be used only in open-cut construction when cathodic protection system is not required by Plans. B References to Technical Specifications: 1. Section 01350—Submittals C Referenced Standards: 1. American Water Works Association (AWWA) a. AWWA C105 American National Standard for Polyethylene Encasement for Ductile-Iron Pipe Systems 2. American Society of Testing and Materials (ASTM) a. ASTM D 1248, "Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and Cable" 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item, no separate payment will be made for polyethylene 1 wrap. Include cost of polyethylene wrap in unit price for items wrapped. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. • B Submit manufacturer's product data for proposed film and tape for approval. 2.0 PRODUCTS T 2.01 MATERIALS A Polyethylene Film: Tubular or sheet form without tears, breaks, holidays or defects; conforming with requirements of AWWA C105,2.5 to 3 percent carbon black content, either low- or high-density: 1. Low-density polyethylene film. Low-density polyethylene film shall be manufactured of virgin polyethylene material conforming to the following requirements of ASTM D 1248. a. Raw material. 1) Type : I 2) Class: C (black) 1 3) Grade: E-5 07/2006 02512- 1 of 4 71 7 CITY OF PEARLAND POLYETHYLENE WRAP 7 4) Flow rate (formerly melt index): 0.4 g/10 minute, maximum 5) Dielectric strength: Volume resistivity, 1015 ohm-cm, 7 minimum 7 b. Physical properties. 1) Tensile strength: 1200 psi, minimum 2) Elongation: 300 percent,minimum 3) Dielectric strength: 800 V/mil thickness, minimum 7 c. Thickness: Low-density polyethylene film shall have a nominal thickness of 0.008 inch. The minus tolerance on thickness is 10 percent of the nominal thickness. C2. High-density,cross-laminated polyethylene film:High-density,cross laminated polyethylene film shall be manufactured of virgin polyethylene material conforming to the following requirements of ASTM D 1248 7 a. Raw material. 1) Type: III 2) Class: C (black) r3) Grade: P33 4) Flow rate (formerly melt index): 0.4 to 0.5g/10 minute, maximum 7 5) Dielectric strength: Volume resistivity, 1015 ohm-cm, minimum 7 b. Physical properties. 1) Tensile strength: 5000 psi, minimum 2) Elongation: 100 percent, minimum 3) Dielectric strength: 800 V/mil thickness, minimum 7 c. Thickness: Film shall have a nominal thickness of 0.004 inch. The minus tolerance of thickness is 10 percent of the nominal thickness. C B Polyethylene Tape: Provide 3-inch wide,plastic-backed,adhesive tape;Polyken No. 900, Scotchwrap No. 50, or equal. 3.0 EXECUTION 7 3.01 INSTALLATION 7 A Preparation: 1. Remove all lumps of clay, mud, cinders, etc., on pipe surface prior to installation of polyethylene encasement. Prevent soil or embedment material 7 from becoming trapped between pipe and polyethylene. 2. Fit polyethylene film to contour of pipe to affect a snug fit, but not tight; encase with minimum space between polyethylene and pipe. Provide sufficient 7 slack in contouring to prevent stretching polyethylene where it bridges irregular surfaces,such as bell-spigot interfaces,bolted joints or fittings,and to prevent damage to polyethylene due to backfilling operations. Secure overlaps and ends with adhesive tape to hold polyethylene encasement in place until L backfilling operations are complete. 7 07/2006 02512-2 of 4 7 CITY OF PEARLAND POLYETHYLENE WRAP 3. For installations below water table and/or in areas subject to tidal actions,seal both ends of polyethylene tube with adhesive tape at joint overlap. B Tubular Type (Method A): 1. Cut polyethylene tube to length approximately 2 feet longer than pipe section. Slip tube around pipe, centering it to provide 1-foot overlap on each adjacent pipe section, and bunching it accordion-fashion lengthwise until it clears pipe ends. ,..� 2. Lower pipe into trench and make up pipe joint with preceding section of pipe. Make shallow bell hole at joints to facilitate installation of polyethylene tube. 3. After assembling pipe joint,make overlap of polyethylene tube. Pull bunched polyethylene from preceding length of pipe, slip it over end of new length of 1 pipe,and secure in place. Then slip end of polyethylene from new pipe section over end of first wrap until it overlaps joint at end of preceding length of pipe. Secure overlap in place. Take up slack width at top of pipe to make a snug,but not tight, fit along barrel of pipe, securing fold at quarter points. 4. Repair cuts, tears,punctures, or other damage to polyethylene. Proceed with installation of next section of pipe in same manner. C Tubular Type (Method B): 1. Cut polyethylene tube to length approximately 1 foot shorter than pipe section. Slip tube around pipe,centering it to provide 6 inches of bare pipe at each end. Take up slack width at top of pipe to make a snug, but not tight, fit along barrel of pipe, securing fold at quarter points; secure ends. 2. Before making up joint, slip 3-foot length of polyethylene tube over end of preceding pipe section, bunching it accordion-fashion lengthwise. After completing joint, pull 3-foot length of polyethylene over joint, overlapping polyethylene previously installed on each adjacent section of pipe by at least 1 foot; make each end snug and secure. 3. Repair cuts, tears,punctures, or other damage to polyethylene. Proceed with installation of next section of pipe in same manner. 1 D Sheet Type: 1. Cut polyethylene sheet to a length approximately 2 feet longer than pipe section. Center length to provide 1-foot overlap on each adjacent pipe section, bunching it until it clears pipe ends. Wrap polyethylene around pipe so that it circumferentially overlaps top quadrant of pipe. Secure cut edge of polyethylene sheet at intervals of approximately 3 feet. 2. Lower wrapped pipe into trench and make up pipe joint with preceding section 7 of pipe. Make shallow bell hole at joints to facilitate installation of polyethylene. After completing joint, make overlap and secure ends. 3. Repair cuts, tears,punctures, or other damage to polyethylene. Proceed with installation of next section of pipe in same manner. j E Pipe-shaped Appurtenances: Cover bends, reducers, offsets, and other pipe-shaped appurtenances with polyethylene in same manner as pipe. 07/2006 02512-3 of 4 7 1 CITY OF PEARLAND POLYETHYLENE WRAP F Odd-shaped Appurtenances: p pp enances: When it is not practical to wrap valves,tees,crosses,and other odd-shaped pieces in tube, wrap with flat sheet or split length of polyethylene tube by passing sheet under appurtenance and bringing it up around body. Make seams by bringing edges together,folding over twice, and taping down. Tape polyethylene securely in place at valve stem and other penetrations. G Repairs: Repair any cuts, tears,punctures, or damage po lyethylene� to p g lyethylene with adhesive tape or with short length of polyethylene sheet or cut open tube,wrapped around pipe to cover damaged area, and secured in place. H Openings in Encasement: Provide openings for branches, service taps,blowoffs, air valves, and similar appurtenances by making an X-shaped cut in polyethylene and temporarily folding back film. After appurtenance is installed, tape slack securely to appurtenance and repair cut,as well as other damaged area in polyethylene,with tape. Service taps may also be made directly through polyethylene, with any resulting damaged areas being repaired as described above. I Junctions between Wrapped and Unwrapped Pipe: Where polyethylene-wrapped pipe joins an adjacent pipe that is not wrapped,extend polyethylene wrap to cover adjacent pipe for distance of at least 3 feet. Secure end with circumferential turns of tape. Wrap service lines of dissimilar metals with polyethylene or suitable dielectric tape for minimum clear distance of 3 feet away from cast or ductile iron pipe. END OF SECTION r c 07/2006 02512-4 of 4 CITY OF PEARLAND HIGH DENSITY POLYETHYLENE (HDPE) SOLID WALL PIPE Section 02532 HIGH DENSITY POLYETHYLEN E (HDPE)SOLID WALL PIPE 1.0 GENERAL 1.01 SECTION INCLUDES A High Density Polyethylene (HOPE) pipe for gravity sewers and drains, including fittings. B HDPE pipe for sanitary sewer force mains,including fittings. C References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 02630—Storm Sewers 4. Section 02530—Gravity Sanitary Sewers Id D Referenced Standards: C1. American Society for Testing and Materials (ASTM) a. ASTM F 714, "Standard Specification for Polyethylene (PE) Plastic Pipe (SDR-PR)Based on Outside Diameter" b. ASTM D 2657, "Standard Practice for Heat Fusion Joining and Polyolefin Pipe and Fittings" c. ASTM D 1248, "Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and Cable" L' d. ASTM D 350, "Standard Test Method for Flexible Treated Sleeving Used for Electrical Insulation" e. ASTM F 477,"Standard Specification for Elastomeric Seals(Gaskets) for Joining Plastic Pipe" f. ASTM D 618,"Standard Practice for Conditioning Plastics for Testing" g. ASTM D 3212,"Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals" 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item, no separate payment will be made for HDPE pipe under this Section. Include costin Bid Items for gravity sanitary sewers and storm sewers. B If HDPE pipe is included as a Bid Item,measurement will be based on the units shown in Section 00300—Bid Proposal and in accordance with Section 01200—Measurement and Payment Procedures. r C07/2006 02532-1 of 4 7 CITY OF PEARLAND HIGH DENSITY POLYETHYLENE (HDPE) SOLID WALL PIPE 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Submit Shop Drawings showing design of pipe and fittings indicating alignment and grade, laying dimensions, fabrication, fittings, flanges, and special details. C Submit product quality,material sources,and field quality information in accordance with this Section. 1.04 PRODUCT QUALITY CONTROL A Provide the manufacturer's certificate of conformance to the Technical Specifications. 2.0 PRODUCTS 2.01 APPROVED AND PREAPPROVED PRODUCTS A Provide HDPE pipe as follows: PRODUCT ASTM PIPE DIAMETER WALL TYPR MANUFACTURER OPTIONS DESIGNATION STIFFNESS RANGE (MIN) (INCHES) Solid Wall Drisco 1000 Approved F 714 Drisco 8600 115 psi 8 to 10 Quail Pipe Poly Pipe 46 psi 12 to 48 Plexco B Solid wall pipe shall be produced with plain end construction for heat joining (butt n fusion)conforming to ASTM D 2657. Utilize controlled temperatures and pressures for joining to produce a fused leak-free joint. 2.02 MATERIALS A Pipe and Fittings: High density, high molecular weight polyethylene pipe material meeting the requirements of Type III, Class C, Category 5, Grade P34, as defined in ASTM D 1248. Material meeting the requirements of cell classification in accordance with ASTM D 350 are also suitable for making pipe products under these specifications. B Gaskets 1. Use gaskets meeting requirement of ASTM F 477. Use gasket molded into a circular form or extruded to the proper section and then spliced into circular form. When no contaminant is identified, use gaskets of a properly cured, high-grade elastomeric compound. The basic polymer shall be natural rubber, synthetic elastomer, or a blend of both. 07/2006 02532-2 of 4 1 CITY OF PEARLAND HIGH DENSITY POLYETHYLENE(HDPE) SOLID WALL PIPE 2. Pipes to be installed in potentially contaminated areas, especially where free I product is found near the elevation of the proposed sewer, shall have the following gasket materials for the noted contaminants: CONTAMINANT GASKET MATERIAL REQ UIRED Petroleum (diesel, gasoline) Nitrile Rubber Other Contaminants As recommended by the pipe manufacturer L C Lubricant. Use a lubricant for assembly of gasketed joints which has no detrimental effect on the gasket or on the pipe, in accordance with manufacturer's recommendations. 2.03 WORKMANSHIP A Furnish pipe and fittings that are homogeneous throughout and free from visible cracks,holes,foreign inclusions,or other injurious defects. Provide pipe as uniform as commercially practical in color, opacity, density, and other physical properties. 2.04 INSPECTIONS A The Engineer reserves the right to inspect pipes or witness pipe manufacturing. Such inspection shall in no way relieve the manufacturer of the responsibilities to provide products that comply with the applicable standards and these Specifications. B Manufacturer's Notification to Customer. Should the Engineer wish to witness the manufacture of specific pipes, the manufacturer shall provide the Engineer with adequate advance notice of when and where the production of those specific pipes will take place. L C Failure to Inspect. Approval of the products or tests is not implied by the Engineer's decision not to inspect the manufacturing, testing, or finished pipes. 2.05 TEST METHODS CA Conditioning. Conditioning of samples prior to and during tests are subject to approval by the Engineer. When referee tests are required,condition the specimens in accordance with Procedure A in ASTM D 618 at 73.4 degrees F plus or minus 3.6 degrees F(23 degrees C plus or minus 2 degrees C) and 50 percent relative humidity plus or minus 5 percent relative humidity for not less than 40 hours prior to test. Conduct tests under the same conditions of temperature and humidity unless otherwise specified. B Flattening. Flatten three specimens of pipe, prepared in accordance with Paragraph 2.05A,in a suitable press until the internal diameter has been reduced to 40 percent of the original inside diameter of the pipe. The rate of loading shall be uniform and at 2- inches per minute. The test specimens, when examined under normal light and with 07/2006 02532-3 of 4 1 CITY OF PEARLAND HIGH DENSITY POLYETHYLENE(HDPE) SOLID WALL PIPE the unaided eye, shall show no evidence of splitting,cracking,breaking,or separation of the pipe walls or bracing profiles. C Joint Tightness. Test for joint tightness in accordance with ASTM D 3212, except replace the shear load transfer bars and supports with 6-inch-wide support blocks that can be either flat or contoured to conform to the pipe's outer contour. D Purpose of Tests. The flattening and the joint tightness tests are not intended to be 1 routine quality control tests, but rather to qualify pipe to a specified level of performance. 2.06 MARKING A Mark each standard and random length of pipe meeting the requirements of this Section with the following information: 1. Pipe size 2. Pipe class 3. Production code 4. Material designation 3.0 EXECUTION 1 3.01 INSTALLATION A Conform to requirements of the following Sections: 1. Section 02630—Storm Sewers 2. Section 02530—Gravity Sanitary Sewers 1 B All HDPE installations shall be bedded and backfilled to top or pipe zone with cement stabilized sand. C All HDPE pipe must terminate in manholes, concrete headwalls, or safety and treatment structures. D Install pipe in accordance with the manufacturer's recommended installation procedures. END OF SECTION 7 1 07/2006 02532-4 of 4 1 CITY OF PEARLAND SANITARY SEWER SERVICE LEADS OR RECONNECTIONS -� Section 02531 7 SANITARY SEWER SERVICE LEADS OR RECONNECTIONS 1.0 GENERAL 1.01 SECTION INCLUDES A Installation of service stubs on new sanitary sewers serving areas where sanitary sewer service did not previously exist. B Reconnection of existing service connections along parallel, replacement, or rehabilitated sanitary sewers. C References to Technical Specifications: 1. Section 01350—Submittals 2. Section 01760—Project Record Documents 3. Section 01500—Temporary Facilities and Controls 4. Section 01570—Trench Safety System 5. Section 01564—Control of Ground Water and Surface Water 6. Section 02318—Excavation and Backfill for Utilities 7. Section 02530—Gravity Sanitary Sewers 8. Section 01140—Contractor's Use of Premises 7 D Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM D 1784,"Standard Specification for Rigid Poly Vinyl Chloride (PVC) Compounds and Chlorinated Poly Vinyl Chloride (CPVC) Compounds" t—+ b. ASTM D 3034, "Standard Specification for Type PSM Poly Vinyl Chloride(PVC) Sewer Pipe and Fittings" c. ASTM D 3212,"Standard Specification for Joints for Drain and Sewer r", Plastic Pipes Using Flexible Elastomeric Seals" 1.02 MEASUREMENT AND PAYMENT A Measurement for single, near-side service leads is on a per each basis, complete in place. B Measurement for double,near-side service leads is on a per each basis, completed in place. C Measurement for single,far-side service leads is on a per each basis,complete in place. D Measurement for double, far-side service leads is on a per each basis, complete in place. 02/2008 02531 - 1 of 6 L.' CITY OF PEARLAND SANITARY SEWER SERVICE LEADS OR RECONNECTIONS E Payment for service leads includes service connections, couplings, clean-outs, adapters, disconnecting existing services, reconnecting new service, fittings, excavation, backfill, and testing. C! F Measurement for sanitary sewer stacks up to 3 vertical feet is on a per each basis, complete in place. Payment includes riser pipe,service connections,couplings,clean- outs, adapters, disconnecting existing services, reconnecting new service, fittings, excavation, backfill, and testing. G Measurement for extra depth sanitary sewer stacks greater than 3 vertical feet is on a vertical foot basis from the top of the receiving sewer to the invert of the service connection, measured and complete in place. Payment includes excavation, pipe, bedding, and backfill for that portion of the stack in excess of 3 feet. H Measurement for sanitary sewer service reconnections with stacks located within 5 feet of the sanitary sewer main centerline shall be per each reconnection,complete in place. I Measurement for sanitary sewer service reconnections without stacks located within 5 feet of the sanitary sewer main centerline shall be per each reconnection,complete in place. J Payment for sanitary sewer service reconnections includes include service connections, couplings, clean-outs, adapters disconnecting existing services, reconnecting new service,fittings, excavation,backfill, and testing. K Augered pipe for service leads will be paid as provided in Section 02415—Augering Pipe or Casing for Sewer. L One or more connections discharging into a common point are considered one service connection. The Contractor shall not add service reconnections without approval of the Engineer. The Engineer may require reconnections to be moved or relocated to avoid ving more t two single family units per reconnection. M Measurehament for abandonmenthan of service connection is on a per each basis. No additional payment will be made for abandonment of service connection unless excavation is required beyond new or replacement sewer or service lead trench zone. No separate payment will be made for excavation of sanitary sewer services within the new or replacement sewer trench. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 - Submittals. B Submit product data for each pipe product, fitting, coupling and adapter. C Submit field red lines documenting location of sanitary sewer stubs and reconnections as installed,referenced to survey Control Points,under the provisions of Section 01760 02/2008 02531 -2 of 6 L 71 CITY OF PEARLAND SANITARY SEWER SERVICE LEADS OR RECONNECTIONS — Project Record Documents, 1.04C. Include location of utilities and structures 7 encountered or rerouted. Give horizontal dimensions, elevations, inverts and gradients. Record the exact distance from each service connection to the nearest downstream manhole. 71 1.04 PROTECTION OF PEOPLE AND PROPERTY A Contractor shall conduct all construction operations under this Contract in conformance with the practices described in Section 01500—Temporary Facilities and Controls. 2.0 PRODUCTS 2.01 PVC SERVICE CONNECTION A As stubouts, use PVC sewer pipe, 4-inch through 10-inch, conforming to ASTM D 1784 and ASTM D 3034, with a cell classification of 12454-B. The SDR (ratio of �I diameter to wall thickness) shall be 26 for pipe 10 inches in diameter or less. B PVC pipe shall be gasket jointed with gasket conforming to ASTM D3212. C Provide service connection pipe in sizes shown on the Plans. For reconnection of existing services, select service connection pipe diameter to match existing service diameter. D Provide a 6-inch service connection when more than one service discharges into a single pipe. 7 E Connect service pipes to new parallel or replacement sewer mains with prefabricated, full-bodied tee or wye fittings conforming to specifications for the sewer main pipe material as specified in other Sections for all sewers up to 18 inches in diameter. F Where new sewers are installed using pipe augering or tunneling, or where the new sewer is greater than 18 inches in diameter, use Fowler "Inserta-Tee"to connect the service to the new sewer main. 2.02 PIPE SADDLES A Use pipe saddles only on rehabilitated sanitary sewer mains. Comply with Paragraph 7 2.01E for new parallel and replacement sanitary sewer mains. Pr 1 02/2008 02531-3 of 6 L: CITY OF PEARLAND SANITARY SEWER SERVICE LEADS OR RECONNECTIONS 2.03 COUPLINGS AND ADAPTERS A For connection between new PVC pipe stubout and existing service;4-,6-,or 8-inch diameter, use flexible adapter coupling consisting of a neoprene gasket and stainless steel shear ring, with 1/2-inch stainless steel band clamps: 1. Fernco Pipe Connectors,Inc., Series 1055 with shear ring SR-8; 2. Band Seal by Mission Rubber Co., Inc.; 3. Approved equal. B For connection between new PVC pipe stub out and new service,use rubber-gasketed adapter coupling: 1. GPK Products,Inc., IPS &Sewer Adapter. 2. Approved Equal. 2.04 STACKS A Provide stacks for service connections wherever the crown of the sewer is 8 feet or more below finished grade. B Construct stacks of the same material as the sanitary sewer and as shown on the Plans. C Pr ovide stacks of the same nominal diameter at the sanitary service line. 2.05 CLEAN-OUTS A Install clean-outs at property line on each service connection as shown in detail on the Plans. 2.06 PLUGS AND CAPS A Seal the upstream end of unconnected sewer service stubs with rubber gasketed plugs or caps of the same pipe type and size. Provide plugs or caps by GPK Products,Inc., or equal. 3.0 EXECUTION 3.01 PERFORMANCE REQUIREMENTS A Accurately field locate service connections, whether in service or not, as pipe laying progresses from downstream to upstream. B Properly disconnect existing connections from the sewer and reconnect to the new sewer, as described in this Section. C Reconnect service connections, including those that go to unoccupied or abandoned buildings, unless directed otherwise by the Engineer. Plug the service connection at the R.O.W. for vacant lots. 02/2008 02531-4 of 6 E 1 CITY OF PEARLAND SANITARY SEWER SERVICE LEADS OR RECONNECTIONS D Connect services 8 inches in diameter and larger to the sewer by construction of a 1 manhole. 3.02 PREPARATION +� A Employ a Trench Safety Plan as specified in Section 01570—Trench Safety System. B Install and operate necessary dewatering and surface water control measures in accordance with requirements of Section 01564 — Control of Ground Water and Surface Water. C Provide a minimum of 48 hours notice to customers whose sanitary sewer service will potentially be interrupted. D Schedule Work so that reconnection of service lines can be completed within 24 hours after disconnection. E Where sewers are existing,field locate existing service connections,whether in service or not. Use existing service locations for reconnection of service lines to new liner or new sanitary sewer main. F For new parallel and replacement sanitary sewer mains, complete testing and acceptance of downstream sewers as applicable. 1 3.03 EXCAVATION AND BACKFILL A Excavate and backfill in accordance with Section 02318—Excavation and Backfill for Utilities. 3.04 RECONNECTION ON NEW SEWER 1 A Install the new service connection on the new sanitary sewer main for each service connection. 1 B Remove and replace cracked, offset or leaking service line for up to 5 feet,measured horizontally, from the centerline of the new sanitary sewer main. C Make up the connection between the new main and the existing service line using PVC sewer pipe and approved couplings, as shown on the Plans. D Test service connections before backfilling. E Embed the service connection and service line as specified for the new sanitary sewer 1 main at this location, and as shown on the Plans. Place and compact trench zone backfill in compliance with Section 02318 —Excavation and Backfill for Utilities. 1 n 02/2008 02531 -5 of 6 1 CITY OF PEARLAND SANITARY SEWER SERVICE LEADS OR RECONNECTIONS 3.05 INSTALLATION OF NEW SERVICE LEADS A Install the new service connections on the new sanitary sewer main for each service connection. Provide the length of stub indicated on the Plans. Install plug or cap on the upstream end of the service stub as needed. Ls B Test service connections before backfilling. C Embed the service connection and service line as specified for the new sanitary sewer main at this location, and as shown on the Plans. Place and compact trench zone backfill in compliance with Section 02318—Excavation and Backfill for Utilities. 3.06 FIELD QUALITY CONTROL A Test service reconnections and service stubs. Follow applicable procedures given in Section 02530—Gravity Sanitary Sewers. 3.07 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. 3.08 PROTECTION OF THE WORK A Protect and maintain all installations good condition until completion of Work. B Replace installations by Contractor's operations at no cost to Owner. C Do not allow sand, debris or runoff to enter sewer system. END OF SECTION 02/2008 02531 -6 of 6 "1 CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES Section 02541 WATER AND WASTEWATER LINE VALVES 1.0 GENERAL 1.01 SECTION INCLUDES A Gate valves, Plug Valves, Butterfly Valves, Air Release and Pressure Reducing Valves. B References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350 -Submittal Procedures 3. Section 02520—Valve Boxes, Meter Boxes, and Meter Vaults 4. Section 02542—Concrete Manholes 5. Section 02318—Excavation and Backfill for Utilities 6. Section 02510—Water Mains C Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM A 307, "Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength" b. ASTM B 763, "Standard Specification for Copper Alloy Sand Casting for Valve Applications" c. ASTM B 62, "Standard Specification for Composition Bronze or Ounce Metal Castings" 7 d. ASTM D 429, "Standard Test Methods for Rubber Property-Adhesion J to Rigid Substrates" e. ASTM_A 126, "Standard Specification for Gray Iron Castings for 7 Valves, Flanges, and Pipe Fittings" f. ASTM A 48, "Standard Specification for Gray Iron Castings" g. ASTM A 240,"Standard Specification for Chromium and Chromium- Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications" h. ASTM A 276, "Standard Specification for Stainless Steel Bars and Shapes" i. ASTM B 584, "Standard Specification for Copper Alloy Sand Castings for General Applications" j. ASTM A 313, "Standard Specification for Stainless Steel Spring Wire" 2. American Water Works Association (AWWA) a. AWWA C500 Gate Valves, 3 Through 48 in. NPS, for Water and Sewage Systems. b. AWWA C509 or AWWA C515 Resilient-seated Gate Valves, 3 through 12 NPS, for Water and Sewage Systems c. AWWA C550 Protective Epoxy Interior Coatings for Valves and Hydrants d. AWWA C504 Rubber-Sealed Butterfly Valves 04/2009 02541 - 1 of 8 r CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES 3. American National Standards Institute(ANSI) 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for valves under this Section. Include cost in Bid Items for water mains. B Refer to Section 01200—Measurement and Payment Procedures. C Stipulated Price(Lump Sum). If the Contract is a Stipulated Price Contract,payment for work in this Section is included in the total Stipulated Price. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 - Submittals. B Submit manufacturer's product data for proposed valves for approval. 1.04 QUALITY CONTROL A Submit manufacturer's affidavit that gate valves are manufactured in the United States and conform to stated requirements of AWWA C500, AWWA C509 and AWWA C515 and this Section,and that they have been satisfactorily tested in the United States in accordance with AWWA C500, AWWA C509 and AWWA C515. 2.0 PRODUCTS 2.01 GATE VALVES A Gate Valves: AWWA C500, AWWA C509 or C515 and additional requirements of this Section.Direct bury valves and those in subsurface vaults,aboveground and plant valves open counterclockwise. B If type of valve is not indicated on Plans,use gate valves as line valves for sizes less than 16-inches. If type of valve is indicated, no substitute is allowed. C Gate Valves 1-1/2 Inches in Diameter and Smaller: 125 psig; bronze; rising-stem; single-wedge; disc type; screwed ends; such as Crane No. 428, or approved equal. D Coatings for Gate Valves 2 Inches and Larger: AWWA C550; Indurall 3300 or approved equal, non-toxic,imparts no taste to water,functions as physical,chemical, and electrical barrier between base metal and surroundings, minimum 8-mil-thick, fusion-bonded epoxy. Prior to assembly of valve, apply protective coating to interior C and exterior surfaces of body. E Gate Valves 2 Inches in Diameter: Iron body,double gate,non-rising stem, 150-pound test, 2 inch square nut operating clockwise to open. 04/2009 02541-2 of 8 CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES F Gate Valves 4 Inches to 12 Inches in Diameter: Non-directional, resilient seated (AWWA C509 or AWWA C515) or parallel seat double disc (AWWA C500), 200 psig, bronze mounting, push-on bell ends with rubber joint rings, and nut-operated unless otherwise specified. Provide resilient seated valves manufactured by American Darling AFC-500, US Pipe Metroseal 200, or approved equal. Provide double disc 'l valves manufactured by American Darling 52, Clow F-6102, or approved equal. Comply with following requirements: 1. Design: Fully encapsulated rubber wedge or rubber seat ring mechanically attached with minimum 304 stainless-steel fasteners or screws; threaded connection isolated from water by compressed rubber around opening. 2. Body: Cast or ductile iron, flange bonnet and stuffing box together with ASTM A 307 Grade B bolts.Manufacturer's initials,pressure rating,and year manufactured shall be cast in body. 3. Bronze: Valve components in waterway to contain not more than 15 percent zinc and not more than 2 percent aluminum. 4. Stems: ASTM B 763 bronze, alloy number 995 minimum yield strength of 40,000 psi; minimum elongation in 2 inches of 12 percent, non-rising. 5. 0-rings: AWWA C509, sections 2.2.6 and 4.8.2. 6. Stem Seals: Consist of three 0-rings, two above and one below thrust collar with anti-friction washer located above thrust collar. 7. Stem Nut: Independent or integrally cast of ASTM B 62 bronze. 8. Resilient Wedge: Molded,synthetic rubber,vulcanized and bonded to cast or ductile iron wedge or attached with 304 stainless steel screws tested to meet or -, exceed ASTM D 429, Method B; seat against epoxy-coated surface in valve body. 9. Bolts: AWWA C509 Section 4.4; stainless steel; cadmium plated, or zinc coated. G Gate Valves 16 Inches to 24 Inches in Diameter: AWWA C500 by Mueller;push-on bell ends with rubber rings and nut-operated unless otherwise specified, double disc, 7 150 psi, and comply with the following: 1. Body: Cast or ductile iron; flange together bonnet and stuffing box with ASTM A 307 Grade B bolts. Manufacturer's initials,pressure rating,and year 7. manufactured shall be cast in body. Equip with rollers, tracks, and scrapers. 2. Stems: Machined from ASTM B 62 bronze rod with integral forged thrust collar machined to size; non-rising. 3. Stem Seals: Consist of one 0-ring above and one 0-ring below thrust collar with anti-friction washer located above thrust collar for operating torque. 4. Stem Nut: Independent or integrally cast of ASTM B 62 bronze. 5. Discs: Cast iron with bronze disc rings securely peened into machined dovetailed grooves. 6. Wedging Device: Solid bronze or cast-iron, bronze-mounted wedges. Thin plates or shapes integrally cast into cast-iron surfaces are acceptable. Other moving surfaces integral to wedging action shall be bronze monel or nickel alloy-to-iron. 7 7 04/2009 02541-3 of 8 7 CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES 7 7. Bronze Mounting: Built as integral unit mounted over, or supported on,cast iron base and of sufficient dimensions to be structurally sound and adequate for 7 imposed forces. 8. Gear Cases: Cast iron;furnished on 18-inch and larger valves and of extended t7ype with steel side plates, lubricated, gear case enclosed with oil seal or O- rings at shaft openings. 9. Stuffing Boxes: Located on top of bonnet and outside gear case. 7H Gate Valves 20 Inches and Larger: Furnish and equip with bypass valves. 1. Sizes: Provide 3-inch bypass valves for 16-inch yp 6 inch through 20 inch gate valves. Provide 4-inch bypass valves for 24-inch gate valves. 7 I Valves 4 Inches through 12 Inches for Installation in Vertical Pipe Lines: 1. Double disc, square bottom. 7 J Valves 14 Inches and Larger for Installation in Horizontal Pipe Lines: 1. Equipped with bronze shoes and slides. 7 K Gate Valves Installed at Greater than 4 foot Depth: 1. Provide non-rising, extension stem having coupling sufficient to attach securely to operating nut of valve. Upper end of extension stem shall terminate 7 in square wrench nut no deeper than 4 feet from finished grade. L Gate Valves in Factory Mutual (Fire Service)Type Meter Installations: 71. Conform to provisions of this specification; outside screw and yoke valves; carry label of Underwriters'Laboratories,Inc.;flanged,Class 125;clockwise to close. 7 M Provide flanged joints when valve is connected to steel or PCCP. 7 2.02 BUTTERFLY VALVES AND ACTUATORS A Butterfly Valves and Actuators: Conform to AWWA C504, except as modified or 7 supplemented herein. Provide valves manufactured by Keystone International, American-Darling, or approved equal. B If type of valve is not indicated on Plans,butterfly valves shall be used for line valve 7 sizes 16 inch and larger. If type of valve is specified, no substitute will be allowed. C Butterfly valves shall be short-body,flanged design and installed at locations as shown 7 on Plans. D Direct-bury valves,valves in subsurface vaults. Above-ground and plant valves shall 7 open counterclockwise. E Provide flanged joints when valve is connected to steel or PCCP. 7 F Butterfly Valves and Actuators(Additional Requirements for Large-Diameter Water Mains): Valves larger than 72 inches in diameter shall have all components designed 7 04/2009 02541-4 of 8 7 1 CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES 1 so that the allowable stresses at rated pressure shall not exceed one-third of the yield strength or one-fifth of the ultimate strength of the material used. Provide valves manufactured by Keystone International, American-Darling, or equal. 2.03 BUTTERFLY VALVE CONSTRUCTION 1 A Valves: AWWA C504, Class 150B. Body: Cast iron, ASTM A 126, Class B. Flanges: ANSI B 16.1, Class 125 lb. B Discs for Butterfly Valves: Either cast iron or ductile iron. JI C Seats: Buna-N or neoprene, and may be applied to disc or body. Seats shall be 1 mechanically secured and may not rely solely on adhesive properties of epoxy or similar bonding agent to attach seat to body. Seats on disc shall be mechanically retained by stainless steel(18-8)retaining ring held in place by stainless steel(18-8) cap screws that pass through rubber seat for added retention. When seat is on disc, seat shall be retained in position by shoulders located on both disc and stainless-steel retaining ring. Mating surfaces for seats: Type 304 or 316,stainless steel and secured 1 to disc by mechanical means. Sprayed-on or plated mating surfaces will not be allowed. D Coat interior wetted ferrous surfaces of valve,including disc,with epoxy suitable for potable-water conditions. Epoxy, surface preparation, and epoxy application: In accordance with AWWA C550 and coating manufacturer's recommendations. Provide two coats of two-component, high-build epoxy with minimum dry thickness of 10 mils. Epoxy coating: Indurall 3300 or approved equal. Coatings shall be holiday tested and measured for thickness. E Valve shaft and keys,dowel pins, or taper pins used for attaching valve shaft to valve disc: Type-304 or 316 stainless steel. Shaft Bearings: Stainless steel,bronze,nylon, or Teflon (supported by fiberglass mat or backing material with proven record of preventing Teflon flow under load)in accordance with AWWA C504. F Packing: Field-adjustable, split-V type, and replaceable without removing operator 1 assembly. G Retaining Hardware for Seats: Type 304 or 316 stainless steel. Nuts and screws used 1 with clamps and discs for rubber seats shall be held securely with locktight, or other approved method, to prevent loosening by vibration or cavitational effects. H Valve disc shall seat in position at 90 degrees to the pipe axis and shall rotate 90 degrees between full-open and tight-closed position. Install valves with valve shafts horizontal and convex side of disc facing anticipated direction of flow, except where shown otherwise on Plans. 2.04 BUTTERFLY VALVE ACTUATOR CONSTRUCTION fl A Provide actuators for valves with size based on line velocity of 16 feet per second, and, unless otherwise shown on Plans, equip with geared manual actuators. Provide 04/2009 02541 -5 of 8 CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES fully enclosed and traveling-nut type, rack-and-pinion type, or worm-gear type for valves 24 inches and smaller. B Provide actuator des igned for installation with valve shaft horizontal unless otherwise indicated on Plans. C Provide valve shaft extended from valve to actuator. Space between actuator housing and valve body shall be completely enclosed so that no moving parts are exposed to soil or elements. - D Provide oil-tight and watertight actuator housings for valves,specifically designed for buried service or submerged service when located in valve vaults,and factory packed with suitable grease. E Install a valve position indicator on each actuator housing located above ground or in valve vaults. Valves shall be equipped with 2-inch actuator nut only. F Indicate direction of opening of valve on exposed visible part of assembly. 7_ G Design worm-gear or traveling-nut actuators so that a torque of 150 foot-pounds, or less,will operate valve at most adverse condition for which valve is designed.Vertical C axis of actuating nut shall not move as valve is opened or closed. 2.05 VALVE BOXES A Provide standard adjustable valve boxes only conforming to requirements of Section 02520—Valve Boxes, Meter Boxes, and Meter Vaults. 2.06 VALVE SERVICE MANHOLES A For large-diameter water mains, provide manholes to dimensions shown on Plans conforming to requirements of Section 02542—Concrete Manholes. 2.07 AIR RELEASE AND VACUUM RELIEF VALVES CA Air Release Valves: Apco No. 200, GA Industries Fig. 2-AR, or equal. gq Materials: body and cover, ASTM A 48, Class 30, cast iron; float and leverage mechanism, L ASTM A 240 or A276 stainless steel;orifice and seat,stainless steel against Buna-N or L Viton mechanically retained with hex head nut and bolt;other valve internals,stainless steel or bronze. Provide inlet and outlet connections, and orifice as shown on Plans. B Air Release and Vacuum Valves: Provide single-body, standard combination or duplex-body custom combination valves as indicated on Plans. 1. For 2 inch and 3 inch, single-body valves, provide inlet and outlet sizes as shown on Plans and orifice sized for 100 psi working pressure. Valve materials: body, cover and baffle, ASTM A 48, Class 35, or ASTM A 126, Grade B cast iron;plug or poppet,ASTM A 276 stainless steel;float,ASTM A 240 stainless steel; seat,Buna-N; other valve internals, stainless steel. Valve exterior: Painted with shop-applied primer suitable for contact with potable 04/2009 02541-6 of 8 E CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES —1 water. Provide Apco Model 145C or 147C, Val-Matic Series 200, or equal valves. 2. For 3 inch and larger duplex body valves as shown on Plans, provide Apco Series 1700 with No. 200 air release valve, GA Industries Fig. No. AR/GH- 21K/280, or equal. Air and vacuum valve materials: body and cover,ASTM A 48, Class 35, cast iron; float, ASTM A 240 stainless steel; seat, Type-304, stainless steel and Buna-N;other valve internals,stainless steel or bronze. Air release valve: Constructed as specified in paragraph above on Air Release Valves. C Vacuum Relief Valves: Provide air inlet vacuum relief valves with flanged inlet and outlet connections as shown on Plans. Provide air release valves in combination with inlet and outlet, and orifice as shown on Plans. Valve shall open under pressure differential not to exceed 0.25 psi. Provide Apco Series 1500 with a No. 200A air release valve, GA Industries Fig. No. HCARV, or approved equal. Materials for vacuum relief valves: valve body, ASTM A 48, Class 35, cast iron; seat and plug, ASTM B 584 bronze, copper alloy 836; spring, ASTM A 313, Type-304, stainless steel;bushing,ASTM B 584 bronze,copper alloy 932;retaining screws,ASTM A 276, Type-304, stainless steel. D Air Release Valve Vault as detailed in Plans. 2.08 PRESSURE REDUCING VALVES A Provide Cla-Val Model 90-01, or approved equal, PRV with strainer in location and arrangement as shown on Plans. Valve body: ASTM A 48,cast iron or ASTM A 126, Class B, cast iron with ANSI B16.1, Class 125, flanges. Valve cover: ASTM A 48 cast iron. Valve internals: Type-303, stainless steel or B-62 bronze. Rubber parts: Buna-N. No leather parts shall be allowed. Resilient seat shall have rectangular cross section. B Control Tubing: Contain shutoff cocks with "Y" strainer. C PRV: Equip with valve position indicator. Initially set in field by authorized manufacturer's representative with 60 psi downstream pressure. D Provide basket strainer upstream of PRV as shown on Plans. Strainer body: quick- 7 opening type, fabricated-steel construction with ANSI B16.1, Class 150, flanges. Basket: Type-304, stainless steel. Provide Hayward Model 90, or equal,for PRV 4- inch through 24-inch. Provide Hayward Model 510, or equal, for PRV 14 inches or greater when space limitations dictate the use of smaller strainer housing. E Pilot Systems for PRV: Adjustable and pressure sustaining. F Valve Box: Valve Box conforming to requirements of Section 02520—Valve Boxes, Meter boxes, and Meter Vaults. T 04/2009 02541 -7 of 8 7 CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES 3.0 EXECUTION 3.01 INSTALLATION A Earthwork. Conform to applicable provisions of Section 02318 —Excavation and Backfill for Utilities. B Operation. Do not use valves for throttling without prior approval of manufacturer. 3.02 SETTING VALVES AND VALVE BOXES A Remove foreign matter from within valves prior to installation. Inspect valves in open and closed positions to verify that parts are in satisfactory working condition. B Install valves and valve boxes where shown on Plans. Set valves plumb and as detailed. Center valve boxes on valves. Carefully tamp earth around each valve box for minimum radius of 4 feet, or to undisturbed trench face if less than 4 feet. Install valves completely closed when placed in water line. C For pipe section of each valve box,use only cast iron,duct ile iron,or DR18 PVC pipe cut to proper length. Size to allow future operation of valve. Assemble and brace box in vertical position as indicated on Plans. 3.03 DISINFECTION AND TESTING A Perform disinfection and testing of valves and appurtenances as required by Section 02510—Water Mains. B Repair or replace valves which exceed the allowable specified leakage rate. 3.04 PAINTING OF VALVES A Paint valves in vaults, stations, and above ground using ACRO Paint No. 2215, or approved equal. END OF SECTION C04/2009 02541-8 of 8 E CITY OF PEARLAND STORM SEWERS Section 02630 STORM SEWERS 1.0 GENERAL 1.01 SECTION INCLUDES A Storm sewers and appurtenances. B References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 01450—Testing Laboratory Services 4. Section 03300—Cast-in-Place Concrete 5. Section 02255—Bedding,Backfill, and Embankment Materials 6. Section 02318—Excavation and Backfill for Utilities 7. Section 02415—Augering Pipe or Casing for Sewers 8. Section 01140—Contractor's Use of Premises C Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM C 76,"Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe b. ASTM C 443,"Standard Specification for Joints for Concrete Pipe and Manholes,Using Rubber Gaskets" c. ASTM C 506, "Standard Specification for Reinforced Concrete Arch Culvert, Storm Drain, and Sewer Pipe" d. ASTM C 877, "Standard Specification for External Sealing Bands for Concrete Pipe, Manholes, and Precast Box Sections" e. ASTM C 507, "Standard Specification for Reinforced Concrete Elliptical Culvert, Storm Drain, and Sewer Pipe" f. ASTM C 655, "Standard Specification for Reinforced Concrete D- 7 Load Culvert, Storm Drain, and Sewer Pipe" g. ASTM D 3350, "Standard Specification for Polyethylene Plastic Pipe and Fittings Materials" h. ASTM C 1433, "Standard Specification for Precast Reinforced Concrete Box Sections for Culverts, Storm Drains, and Sewers" i. ASTM B 633, "Standard Specification for Electrodeposited Coatings Lof Zinc on Iron and Steel" J. ASTM A 760, "Standard Specification for Corrugated Steel Pipe, Metallic-Coated for Sewers and Drains" 2. American Association of State Highway and Transportation Officials (AASHTO) r 07/2006 02630- 1 of 10 CITY OF PEARLAND STORM SEWERS 1.02 MEASUREMENT AND PAYMENT A Measurement for storm sewers is on a linear foot basis taken along the center line of the pipe from center line to center line of manholes or from end to end of culverts,measured and complete in place. Separate measurement will be made for each type and size of pipe installed. B Payment for storm sewer includes pipe,earthwork,connections to existing manholes and pipe,accessories,equipment and execution required or incidental to storm sewer work. C Refer to Section 01200-Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 - Submittals. B Submit manufacturer's literature for product specifications and installation instructions. C Submit product quality, material sources, and field quality information in accordance with this Section. 1.04 TESTING A Testing and analysis of product quality, material sources, or field quality shall be performed by an independent testing laboratory provided by the Owner under the - provisions of Section 01450 - Testing Laboratory Services and as specified in this Section. 7 _J 1.05 QUALITY ASSURANCE A The condition for acceptance will be a storm sewer that is watertight both in pipe-to-pipe joints and in pipe-to-manhole connections. 1.06 PRODUCT DELIVERY,STORAGE AND HANDLING A Comply with manufacturer's recommendations. B Handle pipe,fittings,and accessories carefully with approved handling devices. Do not drop or roll pipe off trucks or trailers. Materials cracked, gouged, chipped, dented, or otherwise damaged will not be approved for installation. C Store pipe and fittings on heavy timbers or platforms to avoid contact with the ground. 7 D Unload pipe,fittings, and specials as close as practical to the location of installation to J avoid unnecessary handling. E Keep interiors of pipe and fittings completely free of dirt and foreign matter. 2.0 PRODUCTS 07/2006 02630-2 of 10 — r CITY OF PEARLAND STORM SEWERS 2.01 PIPE MATERIAL CA Piping materials for storm sewers shall be of the sizes and types indicated on the Plans. B Materials for pipe and fittings, other than those specified or referenced, may be considered for use in storm sewers. C For consideration of other materials, submit complete manufacturer's data including materials, sizes, flow carrying capacity, installation procedures, and history of similar installations to Engineer for pre-bid evaluations, if allowed, or as a substitution. 2.02 REINFORCED CONCRETE PIPE A Circular reinforced concrete pipe shall conform to requirements of ASTM C 76, for Class III wall thickness. Joints shall be rubber gasketed conforming to ASTM C 443. B Reinforced concrete arch pipe shall conform to the requirements of ASTM C 506 for Class A-III. Joints shall conform to ASTM C 877. C Reinforced concrete elliptical pipe, either vertical or horizontal, shall conform to the requirements of ASTM C 507 for Class VE-III for vertical or Class HE-III for horizontal. Joints shall be rubber gaskets conforming to ASTM C 877. D Reinforced concrete D-load pipe shall conform to the requirements of ASTM C 655. E When approved by the Engineer, high density polyethylene, corrugated drainage pipe meeting requirements of AASHTO M252 or M294 and ASTM D 3350,Hancor or equal. 2.03 PRECAST REINFORCED CONCRETE BOX SEWERS A All box sewer sections shall conform to ASTM C1433, as indicated on the Plans. B All pipe and boxes shall be machine-made or cast by a process which will provide for uniform placement of concrete in the forms and compaction by mechanical devices which will assure a dense concrete. C Concrete shall conform to requirements of Section 03300—Cast-in-Place Concrete. D Concrete shall be mixed in a central batch plant or other batching facility from which the quality and uniformity of the concrete can be assured. Transit-mixed concrete is not acceptable. 2.04 CORRUGATED METAL PIPE AND FITTINGS A Corrugated metal pipe may be galvanized steel,aluminized steel,aluminum or precoated galvanized steel as indicated on Plans and conforming to the following: Galvanized Steel AASHTO M218 Aluminized Steel AASHTO M274 Aluminum AASHTO M197 Precoated Galvanized Steel AASHTO M246 07/2006 02630-3 of 10 7 CITY OF PEARLAND STORM SEWERS 1. Reference to gauge of metal is to U.S. Standard Gauge for uncoated sheets. Tables in AASHTO M218 and AASHTO M274 list thicknesses for coated sheets in inches. The tables in AASHTO M197 list thicknesses in inches for clad aluminum sheets. B Coupling bands and other hardware for galvanized or aluminized steel pipe shall conform to requirements of AASHTO M36 for steel pipe and AASHTO M196 for aluminum pipe. 7 1. Coupling bands shall be not more than 3 nominal sheet thicknesses lighter than thickness of pipe to be connected and in no case lighter than 0.052 inch for steel or 0.048 inch for aluminum. 2. Coupling bands shall be made of same base metal and coating (metallic or otherwise) as pipe. 3. Minimum width of corrugated locking bands shall be as shown below for corrugations which correspond to end circumferential corrugations on pipes being joined: a. 10 1/2 inches wide for 2 Z/3 inch x 1/2-inch corrugations. b. 12 inches wide for 3 inch x 1 inch corrugations. 4. Helical pipe without circumferential end corrugations will be permitted only when it is necessary to join a new pipe to an existing pipe which was installed with no circumferential end corrugations. In this event pipe furnished with helical corrugations at ends shall be field jointed with either helically corrugated bands or with bands with projections (dimples). The minimum width of helical corrugated bands shall conform to the following: a. 12 inches wide for 1/2 inch-deep helical end corrugations. b. 14 inches wide for one inch-deep helical end corrugations. 5. Bands with projections shall have circumferential rows of projections with one projection for each corrugation. Width of bands with projections shall be not less than the following: a. 12 inches wide for pipe diameters up to and including 72 inches. Bands shall have two circumferential rows of projections. b. 16 1A inches wide for pipe diameters of 78 inches and greater. Bands shall have four circumferential rows of projections. 'l 6. Bolts for coupling bands shall be 1/2 inch diameter. Bands 12 inches wide or less will have a minimum of 2 bolts per end at each connection, and bands greater than 12 inches wide shall have a minimum of 3 bolts at each connection. 7. Galvanized bolts may be hot dip galvanized in accordance with requirements of AASHTO M 232,mechanically galvanized to provide same requirements as AASHTO M 232, or electro-galvanized per ASTM B 633, Type RS. C Bituminous coated pipe or pipe arch shall be coated inside and out with a bituminous coating which shall meet these performance requirements and requirements of AASHTO M190. 1. Pipe shall be uniformly coated inside and out to a minimum thickness of 0.05 inch,measured on crests of corrugations. 07/2006 02630-4 of 10 CITY OF PEARLAND STORM SEWERS 2. Bituminous coating shall adhere to the metal so that it will not chip,crack, or peel during handling and placement;and shall protect pipe from corrosion and deterioration. 3. Where a paved invert is shown on Plans,pipe or pipe arch,in addition to fully- coated treatment described above,shall receive additional bituminous material, same as specified above, applied to the bottom quarter of circumference to form a smooth pavement. Maintain a minimum thickness of 1/8 inch above crests of corrugations. D Furnish all fittings and specials g p s required for bends, end sections, branches, access manholes, and connections to other fittings. Design fittings and specials in accordance with Plans and ASTM A 760. Fittings and specials are subject to same internal and external loads as straight pipe. 2.05 PIPE FABRICATION A Steel Pipe: 1. Galvanized or aluminized steel pipe shall be full circle or arch pipe conforming to AASHTO M 36,Type I, Type IA, or Type II, as indicated on the Plans. 2. Fabrication with circumferential corrugations, lap joint construction with riveted or spot-welded seams,helical corrugations with continuous helical lock seam, or ultra-high frequency resistance butt-welded seams is acceptable. B Aluminum Pipe: 1. Pipe shall conform to the requirements of AASHTO M 196,Type I,Type IA, circular pipe, or Type II,pipe arch as indicated on the Plans. 2. Fabrication with circumferential corrugations, lap joint construction with �! riveted or spot-welded seams,or helical corrugations with a continuous helical lock seam. 3. Portions of aluminum pipe that will be in contact with concrete or metal other than aluminum, shall be insulated from these materials with a coating of bituminous material meeting requirements of AASHTO M 190. Extend coating a minimum distance of one foot beyond area of contact. C Precoated Galvanized Steel Pipe: 1. Pipe shall be full circle or arch pipe conforming to AASHTO M 245,Type I, { Type IA or Type II as indicated on the Plans. ���--- 2. Fabrication with circumferential corrugations, lap joint construction with riveted seams, or helical lock seams is acceptable. 3. Inside and outside coating shall be a minimum of 10 mils. 07/2006 02630-5 of 10 CITY OF PEARLAND STORM SEWERS fl _ 1 2.06 SOURCE QUALITY CONTROL A Tolerances: Allowable casting tolerances for concrete units are plus or minus 1/4 inch from dimensions shown on the Plans. Concrete thickness in excess of that required will not constitute cause for rejection provided that such excess thickness does not interfere with proper jointing operations. B Precast Unit Identification: Mark date of manufacture and name or trademark of manufacturer clearly on the inside of inlet,headwall or wingwall. C Rejection: Precast units may be rejected for non-conformity with these specifications and for any of the following reasons: 1. Fractures or cracks passing through the shell,except for a single end crack that do not exceed the depth of the joint. 2. Surface defects indicating honeycombed or open texture. 3. Damaged or misshaped ends, where such damage would prevent making a satisfactory joint. D Replacement: Immediately remove rejected units from the work site and replace with acceptable units. 7 E Repairs: Occasional imperfections resulting from manufacture or accidental damage may be repaired if, in the opinion of the Engineer, repaired units conform to requirements of these specifications. ^� 2.07 BEDDING,BACKFILL,AND TOPSOIL MATERIAL 1 A Bedding and Backfill Material: Conform to Plans and requirements of Sections 02255— Bedding, Backfill, and Embankment Materials. 3.0 EXECUTION 3.01 PREPARATION A Conform to requirements of Section 02318—Excavation and Backfill for Utilities,3.02 "Preparation". 3.02 EARTHWORK A Excavate in accordance with requirements of Section 02318—Excavation and Backfill for Utilities,except where tunneling or jacking methods are shown on the Plans. When pipes are laid in a trench, the trench when completed and shaped to receive the pipe, shall be of sufficient width to provide free working space for satisfactory bedding and jointing and thorough tamping of backfill and bedding material under and around pipe. B Bed pipe in accordance with Plans. When requested by Engineer, furnish a simple template for each size and shape of pipe for use in checking shaping of bedding. Template shall consist of a thin plate or board cut to match lower half of cross section. 07/2006 02630-6 of 10 CITY OF PEARLAND STORM SEWERS C Where rock in either ledge or boulder form exists below pipe, remove the rock below grade and replace with suitable materials so that a slightly yielding compacted earth cushion is provided below pipe a minimum of 12 inches thick. D Where soil encountered at established grade is quicksand, muck or similar unstable materials, such unstable soil shall be removed and replaced in accordance with requirements of Section 02318 —Excavation and Backfill for Utilities. Do not allow cement stabilized materials for backfill to come into contact with any uncoated aluminum or aluminized pipe surface. E After metal pipe structure has been completely assembled on proper line and grade and headwalls constructed when required by the drawing details,place selected material from excavation or borrow along both sides of the completed structures equally,in uniform layers not exceeding 6 inches in depth (loose measurement), wetted if required and thoroughly compacted between adjacent structures and between structure and sides of trench, or for a distance each side of structure equal to diameter of pipe. Backfill material shall be compacted to the same density requirements as specified for adjoining sections of embankment in accordance with specifications. Above three-fourths point of structure,place uniformly on each side of pipe in layers not to exceed 12 inches. F Only hand operated tamping equipment will be allowed within vertical planes 2 feet beyond horizontal projection of outside surface of structure for backfilling, until a minimum cover of 12 inches is obtained. Remove and replace damaged pipe. G Do not permit heavy earth moving equipment to haul over structure until a minimum of 4 feet of permanent or temporary compacted fill has been placed. H During backfilling, obtain uniform backfill material and uniform compacted density throughout length of structure so that unequal pressure will be avoided. Provide proper backfill under structure. I Prior to adding each new layer of loose backfill material, an inspection will be made of inside periphery of structure for local or unequal deformation caused by improper construction methods. Evidence of deformation will be reason for such corrective measures as may be directed by Engineer. 3.03 CORRUGATED METAL PIPE INSTALLATION A Place pipes on prepared foundation starting at outlet end. Join sections firmly together, with side laps or circumferential joints pointing upstream and with longitudinal laps on sides. B Metal in joints which is not protected by galvanizing or aluminizing shall be coated with an approved asphaltum paint. C Provide proper equipment for hoisting and lowering sections of pipe into trench without damaging pipe or disturbing prepared foundation and sides of trench. Pipe which is not in alignment or which shows undue settlement after laying,or is damaged,shall be taken up and relaid. 07/2006 02630-7 of 10 r- CITY OF PEARLAND STORM SEWERS l D Multiple installations of corrugated metal pipe and pipe arches shall be laid with the center lines of individual barrels parallel. Unless otherwise indicated on the Plans, 7 maintain the following clear distances between outer surfaces of adjacent pipes: DIAMETER CLEAR DISTANCE BETWEEN PIPES PIPE ARCH ,..' OF PIPE FULL CIRCLE AND PIPE ARCH DESIGN NO. 18" 1' 2" 2 24" 1' 5" 37 30" 1' 8" 4 36" 1' 11" 5 42" 2' 2" 6 48" 2' 5" 7 54" 2' 10" 8 60"—84" 3' 2" 9 90"— 120" 3' 5" 10 &Over E Where extensions are attached to existing structures,install a proper connection between 1 structure and existing as indicated on Plans, coat the connection with bituminous material when required. 7 F When existing headwalls and aprons are indicated for reuse on the Plans,sever portion to be reused from the existing culvert, and relocate to prepared position. Damaged 7 headwalls, aprons or pipes attached to the headwall, shall be restored to their original 1 condition. 3.04 JOINTING 1 A Field joints shall maintain pipe alignment during construction and prevent infiltration of side material. 7 B Coupling bands shall lap equally on pipes being connected to form a tightly-closed joint. C Use corrugated locking bands to field join pipes furnished with circumferential 7 corrugations including pipe with helical corrugations having reformed circumferential corrugations on ends. Fit locking bands into a minimum of one full circumferential ` ] corrugation of pipe ends being coupled. 3.05 CONCRETE PIPE INSTALLATION 7 A Install in accordance with the Plans and pipe manufacturer's recommendations and as specified in this Section. B Install pipe only after excavation is completed,the bottom of the trench shaped,bedding material is installed, and the trench has been approved by the Engineer. 1 07/2006 02630-8 of 10 7 7 i 7 CITY OF PEARLAND STORM SEWERS I C Install pipe to the line'and grade-indicated. Place pipe so that it has continuous bearing E of barrel on bedding material and is laid in the trench so the interior surfaces of the pipe follow the grades and alignments indicated. D Install pipe with the spigot ends toward the direction of flow. . 7 E Form a concentric joint with each section of adjoiningpipeto prevent offsets. so as �'" F Place and drive home newly laid,sections with come-a-long winches so as to eliminate (_ damage to sections. Use of back hoes or similar powered equipment will not be allowed unless protective measures are provided and approved in advance by the Engineer. LG Keep the interior of pipe clean as the installation progresses. Where cleaning after laying the pipe is difficult because of small pipe size, use a suitable swab or drag in the pipe and pull it forward past each joint immediately after the joint has been completed. 7 H Keep excavations free of water during construction and until final inspection. 7 I When work is not in progress,cover the exposed ends of pipes with an approved plug to prevent foreign material from enteringthepipe. g 7 3.06 PIPE INSTALLATION OTHER THAN OPEN CUT A For installation of pipe by augering,boring,or jacking pipe,conform to requirements of 7Section 02415 - Augering Pipe or Casing for Sewers. 3.07 CONNECTIONS j A Connect inlet leads to the inlets as shown on the Plans. Use non-shrink grout jointing material as shown on the Plans Drawing or as approved. Make connections water tight. 7 3.08 FINISHES A Cut off inlet leads neatly at the inside face of inlet wall. Point up with mortar or field 7 galvenizing. B When the box section of the inlet has been completed, shape the floor of the inlet with 7 mortar to conform to the detailed Plans. C Finish concrete surfaces in accordance with requirements of Section 03300—Cast-in- 7Place Concrete. 3.09 BACKFILL 7 A Backfill the trench only after pipe installation is approved by the Engineer. B Bed pipes with materials conforming to requirements of Section 02318—Excavation and 7 Backfill for Utilities and as indicated on Plans. 7 07/2006 02630-9 of 10 7 1 CITY OF PEARLAND STORM SEWERS C Backfill and compact soil in accordance with Section 02318—Excavation and Backfill for Utilities. 3.10 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. B In unpaved areas, grade surface as a uniform slope to natural grade as indicated on the Plans. END OF SECTION J ` 1 1 1 1 1 1 1 1 07/2006 02630- 10 of 10 1 • 1 CITY OF PEARLAND FRAMES,GRATES, 7 RINGS,AND COVERS Section 02603 7 FRAMES, GRATES,RINGS,AND COVERS 1.0 GENERAL 1.01 SECTION INCLUDES A Iron castings for manhole frames and covers, inlet frames and grates, catch basin 1 frames and grates, meter vault frames and covers, adjustment rings and extensions. B Ring grates. 1 C References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350 -Submittals D Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM A 48, "Standard Specification for Gray Iron Castings" b. ASTM A 615, "Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement" c. ASTM C 270, "Standard Specification for Mortar for Unit Masonry" 2. American Association of State Highway and Transportation Officials (AASHTO) a. AASHTO M 306, "Drainage, Sewage, Utility, and Related Castings" 3. American Welding Society(AWS) a. AWS D12.1, "Reinforcing Steel Welding Code" 1.02 MEASUREMENT AND PAYMENT A Unless indicated as a Bid Item, no separate payment will be made for frames, grates, rings, covers, and seals under this Section. Include cost in Bid Items for which this Work is a component. B If frames,grates,rings,covers,and seals are included as a Bid Items,measurement will be based on the Units shown in Section 00300—Bid Proposal and in accordance with Section 01200—Measurement and Payment Procedures. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — Submittals. B Provide copies of manufacturer's specifications, load tables, dimension diagrams, anchor details, and installation instructions. Manufacturer shall be East Jordan Iron Works, Inc. or approved equal. 02/2008 02603- 1 of 3 1 CITY OF PEARLAND FRAMES,GRATES, RINGS,AND COVERS C Provide Shop Drawings for fabrication and erection of casting assemblies. Include plans, elevations, sections and connection details. Show anchorage and accessory { items. Include Setting Drawings for location and installation of castings and anchorage devices. 2.0 PRODUCTS 2.01 CASTINGS A Castings for frames,grates,rings and covers shall conform to ASTM A 48,Class 35B and AASHTO M 306. Provide locking covers if indicated on Plans. B Castings shall be capable of g p withstanding the application of an AASHTO H-20 loading without permanent deformation. C Fabricate castings to conform to the shapes, dimensions, and P � with wording or logos shown on the Plans. D Castings shall be 75%post-consumer recycled material, clean, free from blowholes and other surface imperfections. Cast holes in covers shall be clean and symmetrical, free of plugs. 2.02 BEARING SURFACES A Machine bearing surfaces between covers or grates and their respective frames so that even bearing is provided for any position in which the casting may be seated in the frame. 2.03 SPECIAL FRAMES AND COVERS A Where indicated on the Plans,provide stainless steel inflow preventers and watertight manhole frames and covers with a minimum of four bolts and a gasket designed to seal cover to frame. Supply watertight manhole Frames and Covers, Model R-1916 manufactured by Neenah Foundry Company, Model V-2420 by East Jordan Iron Works, or approval equal. 2.04 FABRICATED RING GRATES A Ring grates shall be fabricated from reinforcing steel conforming to ASTM A 615. B Welds connecting the bars shall conform to AWS D12.1. 2.05 MORTAR A Conform to requirements of ASTM C 270,Type S using Portland cement. 02/2008 02603-2 of 3 E 1 CITY OF PEARLAND FRAMES,GRATES, RINGS,AND COVERS 3.0 EXECUTION 3.01 INSTALLATION A All installations that have an elevation difference between the final elevation of the manhole cover and the surrounding finished grade greater than 18 inches will be required to be hinged, lift assist gasketed ring and cover. B Install castings according to approved Shop Drawings, instructions given in related Sections, and applicable directions from the manufacturer's printed materials. C Set castings accurately at required locations to proper alignment and elevation. Keep castings plumb, level, true and free of rack. Measure location accurately from established lines and grades. Brace or anchor frames temporarily in formwork until permanently set. D Ring grates shall be fabricated in accordance with Plans and shall be set in mortar in the mouth of the pipe bell. END OF SECTION 1 1 1 1 1 1 1 1 02/2008 02603 -3 of 3 1 CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES 7 Section 02542 CONCRETE MANHOLES AND ACCESSORIES T 1.0 GENERAL 1.01 SECTION INCLUDES A Cast-in-Place and Pre-Cast Concrete Manholes for sanitary sewer and storm sewer. B Iron castings for manhole frames and covers,inlet frames and grates,catch basin frames and grates,meter vault frames and covers, adjustment rings and extensions. C Ring grates. D References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 01500—Temporary Facilities and Controls 4. Section 03300—Cast-in-Place Concrete 5. Section 02255 —Bedding,Backfill, and Embankment Materials 6. Section 02318—Excavation and Backfill for Utilities 7. Section 02530—Gravity Sanitary Sewers 1 8. Section 01140—Contractor's Use of Premises E Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM C 478,"Standard Specification for Precast Reinforced Concrete Manhole Sections" b. ASTM C 443,"Standard Specification for Joints for Concrete Pipe and Manholes,Using Rubber Gaskets" c. ASTM C 270, "Standard Specification for Mortar for Unit Masonry" d. ASTM C 923, "Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures,Pipes and Laterals" e.. ASTM C 1107,"Standard Specification for Packaged Dry,Hydraulic- Cement Grout(Nonshrink)" f. ASTM A 48, "Standard Specification for Gray lion Castings" g. ASTM A 615, "Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement" h. ASTM D 698, "Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort" i 2. American Association of State Highway and Transportation Officials (AASHTO) 3. American Water Works Association (AWWA) 4. American Welding Society (AWS) a. AWS D12.1, "Reinforcing Steel Welding Code" 02/2008 02542- 1 of 9 - 1 7 CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES 7 F Definitions: A 1. Shallow Depth Manholes-manholes having a depth of 4 feet or less measured L' from the top of cover to sewer invert. 2. Normal Depth Manholes-manholes having a depth of greater than 4 feet and up to 8 feet measured from top of cover to sewer invert. 7 3. Extra Depth Manholes- manholes having a depth of greater than 8 feet measured from the top of cover to sewer invert. 4. Corrosion Resistant Manholes- concrete manholes incorporating additional 7 material, such as liners or coatings, which make them more resistant to corrosion than typical concrete manholes. 5. Standard Manholes Drops- drops of up to 3 vertical feet measured from the 7 invert of the T-fitting to the sewer invert. 6. Extra Depth Manhole Drops- drops in excess of 3 vertical feet measured from the invert of the T-fitting to the sewer invert. 7 1.02 MEASUREMENT AND PAYMENT 7 A Measurement for Normal Depth Manholes and/or Normal Depth Corrosion Resistant Manholes shall be per each. 7 B Measurement for Shallow Depth Manholes and/or Shallow Depth Corrosion Resistant Manholes shall be per each. C Measurement for Extra Depth Manholes and/or Extra Depth Corrosion Resistant 7 Manholes is on a vertical foot basis for each foot of depth greater than 8 feet. D Payment for Manholes under this Section shall be for complete installation including 7 riser, frames, grates, adjustment rings, stainless steel inflow preventers, cut-in work, covers,penetrations, other appurtenances, and be in accordance with Section 01200— Measurement and Payment Procedures. 7 E Measurement for Standard Manhole Drops shall be per each. 7 F Measurement for Extra Depth Manhole Drops is on a vertical foot basis for each foot of Drop greater than 3 feet. 7 G Payment for Drops under this Section shall be for assembly components,encasement, other appurtenances, and be in accordance with Section 01200 — Measurement and Payment Procedures. 7 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 — 7Submittals. B Submit proposed design mix and test data for each type and strength of concrete. CC Submit manufacturer's data and details of following items for approval: 1. Frames, grates,rings, and covers. CO2/2008 02542-2 of 9 7 CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES 1 2. Materials to be used in fabricating drops. 3. Materials to be used for pipe connections at manhole walls. 7 4. Materials to be used for stubs and stub plugs. 5. Plugs to be used for sanitary sewer hydrostatic testing. 6. Shop Drawings of manhole sections and base units and construction details, including reinforcement,jointing methods, materials and dimensions. 7. Certification from manufacturer that precast manhole design is in full accordance with ASTM C 478 and design criteria as established in this Section, 2.03E, "Design Loading Criteria". 8. Materials and procedures for corrosion resistant liner and coatings,if required. 9. Manufacturer's data for pre-mix(bag)concrete,if used for channel inverts and benches. D Provide Shop Drawings for fabrication and erection of casting assemblies. Include plans, elevations, sections and connection details. Show anchorage and accessory items. Include Setting Drawings for location and installation of castings and anchorage devices. 2.0 PRODUCTS 2.01 PRECAST CONCRETE MANHOLES 7 A Use manhole sections and base sections conforming to ASTM C 478. Use base riser section with integral floors, unless shown otherwise. Provide adjustment rings which 7 are standard components of the manufacturer of the manhole sections meeting material j requirements of ASTM C 478. Mark date of manufacture and name or trademark of manufacturer on inside of barrel. B Construct barrels for precast manholes from 48-inch diameter standard reinforced concrete manhole sections unless otherwise indicated on Plans. Use various lengths of 7 manhole sections in combination to provide the correct height with the fewest joints. Wall sections shall be designed for depth as shown and loading conditions as described in this Section,2.03E,"Design Load Criteria",but shall not be less than 5 inches thick. Base section shall have a minimum thickness of 12 inches under the invert. C Provide cone tops to receive cast iron frames and covers, unless indicated otherwise. Use tops designed to support an AASHTO H-20 loading. �I D Where the Plans indicate that manholes larger than 48-inch diameter are required, precast base sections of the required diameter shall be provided with flat slab top 7 precast sections used to transition to 48-inch diameter manhole access riser sections. Transition can be concentric or eccentric. The transition shall be located to provide a minimum of 7-foot head clearance from the top of bench to underside of transition. 7 E Design Loading Criteria: The manhole walls,transition slabs,cone tops,and manhole base slab shall be designed by the manufacturer to the requirements of ASTM C 478 for 7 the depth as shown on Plans and the following design criteria: 1. AASHTO H-20 loading applied to the manhole cover and transmitted down to the transition and base slabs. 02/2008 02542-3 of 9 7 7 CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES 7 2. Unit soil weight of g 120 pcf located above all portions of the manhole,including base slab projections. 7 3. Lateral soil pressure based on saturated soil conditions producing an at-rest equivalent fluid pressure of 100 pcf, with soil pressure acting on empty manhole. C4. Internal liquid pressure based on a unit weight of 63 pcf, with manhole filled with liquid from invert to cover, with no balancing external soil pressure. 5. Dead load of manhole sections fully supported by the transition and base slabs. 7 6. Design additional reinforcing steel to transfer stresses at openings. 7. The minimum clear distance between any two wall penetrations shall be 12 inches or half the diameter of the smaller penetration, whichever is greater. 7 F Form joints between sections with 0-ring gaskets conforming to ASTM C 443. G Do not incorporate manhole steps in manhole sections. C H Do not use brick masonry in construction of sanitary sewer manholes. 7 2.02 MORTAR A Conform to requirements of ASTM C 270, Type S using Portland cement. C2.03 MISCELLANEOUS METALS 7 A Provide cast-iron frames, grates, rings, covers, and stainless steel inflow preventers conforming to requirements of this Section and the City of Pearland Standard Construction Details. 7 2.04 DROPS A Drops shall conform to the same pipe material requirements used in the main pipe, C unless otherwise indicated on the Plans. C2.05 PIPE CONNECTIONS A Use resilient connectors conforming to requirements of ASTM C 923. Metallic mechanical devices as defined in ASTM C 923 shall be made of the following C materials: 1. External clamps: Type 304 stainless steel 2. Internal,expandable clamps on standard manholes:Type 304 stainless steel,11 7 gage minimum. 3. Internal, expandable clamps on corrosion-resistant manholes: a. Type 316 stainless steel, 11 gage minimum, or C b. Type 304 stainless steel, 11 gage minimum,coated with minimum 16 mil fusion-bonded epoxy conforming to AWWA C 213. 4. All precast openings shall be fully circular, 360°openings. 7 7 02/2008 02542-4 of 9 7 7 CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES B Where rigid joints between pipe and a cast-in-place manhole base are specified or shown on the Plans,use polyethylene-isoprene water-stop meeting the physical property requirements of ASTM C 923,Press-Seal WS Series, or equal. C Storm sewer pipe connections: ,-, 1. Connections acceptable for sanitary sewers. 2. Line pipe grouted in place with mortar. 2.06 SEALANT MATERIALS7 A Sealing materials between precast concrete adjustment ring and manhole cover frame shall be Adeka Ultraseal P201, or approved equal. '"r 2.07 CORROSION RESISTANT MANHOLE MATERIALS J A Provide one of the following as indicated on the Plans: 7 1. Precast cylindrical polymer concrete manhole sections,base sections,and cone sections. 2. Precast cylindrical Portland cement concrete manhole sections,base sections, 7 and cone sections with one of the following factory applied internal coatings or 1 approved equal: a. NeoPoxyTM NPR-5300 Series "PureEpoxy" spray on epoxy liner and other required fillers/sealants per manufacturer's recommendations: 1) NeoPoxy NPR-3501 high tensile elongation epoxy —1 elastomeric gout and sealant. 2) NeoPoxy NPR-5305 trowelable epoxy filler, grout and sealant, 3) Chemical and cementitious rapid set hydraulic grouts such7 as Strong-Plug, Strong-Seal QSR,Quadex Hyperform and Quadex Hydro-Plug, or other equivalents pre-approved by the engineer. 7 4) NeoPoxy P-88 ultraviolet light resistant topcoat. b. EMACO liner(contact City of Pearland Public Works Department for specific type). c. Raven liner (contact City of Pearland Public Works Department for specific type). 2.08 BACKFILL MATERIALS i A Backfill materials shall conform to the requirements of Section 02255 - Bedding, 7 Backfill, and Embankment Materials. 2.09 NON-SHRINK GROUT A For non-shrink grout, use prepackaged, inorganic, flowable, non-gas-liberating, 1 non- metallic, cement-based grout requiring only the addition of water. It shall meet the requirements of ASTM C 1107 and shall have a minimum 28-day compressive strength of 7000 psi. 02/2008 02542-5 of 9 7 7 r CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES 2.10 CASTINGS A Castings for frames,grates,rings and covers shall conform to City of Pearland Standard Construction Details and shall be ASTM A 48, Class 30. Provide locking covers if indicated on Plans. B Castings shall be capable of withstanding the application of an AASHTO H-20 loading without permanent deformation. C Fabricate castings to conform to the shapes, dimensions, and with wording or logos shown on the Plans. D Castings shall be clean, free from blowholes and other surface imperfections. Cast holes in covers shall be clean and symmetrical,free of plugs. 2.11 BEARING SURFACES A Machine bearing surfaces between covers or grates and their respective frames so that even bearing is provided for any position in which the casting may be seated in the frame. 2.12 SPECIAL FRAMES AND COVERS A Where indicated on the Plans, provide watertight manhole frames and covers with a minimum of four bolts and a gasket designed to seal cover to frame. Supply watertight manhole covers and frames, Model R-1916 manufactured by Neenah Foundry Company,Model V-2420 by East Jordan Iron Works, or approval equal. C2.13 FABRICATED RING GRATES A Ring grates shall be fabricated from reinforcing steel conforming to ASTM A 615. B Welds connecting the bars shall conform to AWS D12.1. 2.14 INFLOW PREVENTERS A Provide stainless steel inflow preventers with air release vents on all sanitary sewer manholes. 3.0 EXECUTION 3.01 EXAMINATION A Verify lines and grades are correct. B Determine if the subgrade, when scarified and re-compacted, can be compacted to 95 percent of maximum Standard Proctor Density according to ASTM D 698 prior to placement of foundation material and base section. If it cannot be compacted to that density,the subgrade shall be moisture conditioned until that density can be reached or shall be treated as an unstable subgrade. 02/2008 02542-6 of 9 CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES C Do not build sanitary or storm sewer manholes in ditches, swales, or drainage paths unless approved by the Engineer. 3.02 PLACEMENT OF PRECAST MANHOLES A Install precast manholes to conform to locations and dimensions shown on Plans. B Place manholes at points of change of alignment,grade,size,pipe intersections,and end '"I of sewer. 3.03 MANHOLE BASE SECTIONS AND FOUNDATIONS 7 A Place precast base on 12-inch-thick(minimum)foundation of cement stabilized sand or a concrete foundation slab. Compact cement-sand in accordance with requirements of 7 Section 02318—Excavation and Backfill for Utilities. B Unstable Subgrade Treatment: When unstable subgrade is encountered,the subgrade will be examined by the Engineer to determine if the subgrade has heaved upwards after being excavated. If heaving has not occurred,the subgrade shall be over-excavated to -1 allow for a 24-inch thick layer of crushed stone wrapped in filter fabric as the foundation material under the manhole base. If there is evidence of heaving, a pile- supported concrete foundation, as detailed on the Plans, shall be provided under the manhole base, when indicated by the Engineer. 3.04 PRECAST MANHOLE SECTIONS A Install sections, joints, and gaskets in accordance with manufacturer's printed recommendations. B Install precast or steel adjustment rings above tops of cones or flat-top sections as required to adjust the finished elevation and to support manhole frame. C Seal any lifting holes with non-shrink grout. ,.., D Where PVC liners are required, seal joints between sections in accordance with manufacturers recommendations. 7 3.05 PIPE CONNECTIONS AT MANHOLE A Install approved resilient connectors at each pipe entering and exiting sanitary sewer 1-1 manholes in accordance with manufacturer's instructions. B Ensure that no concrete,cement stabilized sand,fill,or other rigid material is allowed to enter the space between the pipe and the edge of the wall opening at and around the resilient connector on either the interior or exterior of the manhole. If necessary,fill the space with a compressible material to guarantee the full flexibility provided by the 7 resilient connector. All pipe openings shall be fully circular, 360° openings. 02/2008 02542-7 of 9 7 CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES C Where a new manhole is to be constructed on an existing sewer,install precast manhole base with factory installed Fernco type connections and pipe stubouts at least two (2) feet outside manhole wall. Manhole shall be cut-in to existing pipe. No"horseshoe"or "dog house"type connections will be permitted. D Do not construct joints on sanitary sewer pipe within wall sections of manholes. Use approved connection material. E Construct pipe stubs with resilient connectors for future connections at locations and with material indicated on Plans. Install approved stub plugs at interior of manhole. F Test connection for watertight seal before backfilling. 3.06 INVERTS FOR SANITARY SEWERS A Construct invert channels to provide a smooth flow transition waterway with no disruption of flow at pipe-manhole connections. Conform to following criteria: 1. Slope of invert bench: 1 inch per foot minimum; 1-1/2 inch per foot maximum. 2. Depth of bench to invert: a. Pipes smaller than 15-inches: one-half largest pipe diameter b. Pipes 15 to 24-inches: three-fourths the largest pipe diameter c. Pipes larger than 24-inches: equal to the largest pipe diameter 3. Invert slope through manhole: 0.10-foot drop across manhole with smooth transition of invert through manhole, unless otherwise indicated on Plans. B Form invert channels with class A concrete if not integral with manhole base. For direction changes of mains, construct channels tangent to mains with maximum possible radius of curvature. Provide curves for side inlets and smooth invert fillets for L flow transition between pipe inverts. 3.07 DROPS FOR SANITARY SEWERS A Construct Drops with same materials used in main pipe unless otherwise indicated on Plans or approved by the Engineer. Install a Drop when a sewer line enters a manhole higher than 30-inches above the invert of the manhole. All drops must be interior drops. CB Terminate encasement of blind drops a minimum of 5 inches below top of bell and not less than 12 inches above top of next lower bell. Install approved plug at bell. 3.08 MANHOLE FRAME AND ADJUSTMENT RINGS A Combine precast concrete adjustment rings so that the elevation of the installed casting cover is 3/8 inch below the pavement surface. Seal between adjustment ring and the manhole top with non-shrink grout;do not use mortar between adjustment rings. Apply a latex-based bonding agent to concrete surfaces to be joined with non-shrink grout. Set the cast iron frame on the adjustment ring in a bed of approved sealant. The sealant bed shall consist of two beads of sealant, each bead having minimum dimensions of 1/2- inch and 3/4-inch wide. 02/2008 02542.-8 of 9 CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES B For manholes in unpaved areas,top of frame shall be set a minimum of 6 inches above existing ground line unless otherwise indicated on Plans. In unpaved areas,encase the manhole frame in mortar or non-shrink grout placed flush with the face of the manhole ring and the top edge of the frame. Provide a rounded corner around the perimeter. 3.09 BACKFILL A Place and compact backfill materials in the area of excavation surrounding manholes in accordance with requirements of Section 02318—Excavation and Backfill for Utilities. Use embedment zone backfill material, as specified for the adjacent utilities, from manhole foundation up to an elevation 12 inches over each pipe connected to the manhole. Provide trench zone backfill,as specified for the adjacent utilities,above the embedment zone backfill. B Where rigid joints are used for connecting existing sewers to the manhole, backfill under the existing sewer up to the spring-line of the pipe with Class B concrete or flowable fill. 3.10 FIELD QUALITY CONTROL A Conduct leakage testing of manholes in accordance with requirements of Section 02530 —Gravity Sanitary Sewers. 3.11 CLEAN-UP AND RESTORATION A Perform clean-up and restoration in and around construction zone in accordance with Section 01140—Contractor's Use of Premises. 3.12 PROTECTION OF THE WORK A Protect Manholes from damage until subsequent work has been accepted. B Repair or replace damaged elements of Manholes at no additional cost to the Owner. C In unpaved areas,provide positive drainage away from manhole frame to natural grade. END OF SECTION ".1 T 02/2008 02542-9 of 9 7 CITY OF PEARLAND DUCTILE IRON PIPE AND FITTINGS Section 02634 DUCTILE IRON PIPE AND FITTINGS 1.0 GENERAL 1.01 SECTION INCLUDES A Ductile iron pipe and fittings for water mains,wastewater force mains,gravity sanitary sewers, and storm sewers. B References to Technical Specifications: 1. Section 01350—Submittals 2. Section 02676—Hydrostatic Testing of Pipelines 3. Section 02533—Sanitary Sewage Force Mains 4. Section 02630—Polyethylene Wrap 5. Section 02510—Water Mains 6. Section 02530—Gravity Sanitary Sewers C Referenced Standards: 1. American National Standards Institute (ANSI) a. ANSI A21.51,Ductile-Iron Pipe Centrifugal Cast, in Metal Molds b. ANSI A21.11, Rubber Gasket Joints Cast and Ductile Iron Press Pipe c. ANSI A21.15, Flanged Cast and Ductile Iron d. ANSI A21.50, Thickness Design of Ductile Iron Pipe e. ANSI A21.10, Cast Iron and Ductile Iron Fittings,2 thru 48 in./Water f. ANSI B 16.1, Cast Iron Pipe Flanges and Flanged Fittings "1 g. ANSI A21.53,Ductile-Iron Compact Fittings for Water Service h. ANSI A21.4, Cement-Mortar lining/Cast and Ductile Iron Pipe and Fittings 2. American Water Works Association (AWWA) a. AWWA C111 Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings b. AWWA C110 Ductile-Iron and Gray Iron Fittings for Water c. AWWA C153 Ductile-Iron Compact Fittings for Water Service d. AWWA C600 Installation for Ductile-Iron Water Mains and Their Appurtenances 3. Steel Structures Painting Council (SSPC) a. SSPC-SP 6, Commercial Blast Cleaning 4. American Society for Testing and Materials (ASTM) a. ASTM G 62,"Standard Test Method for Holiday Detection in Pipeline Coatings" b. ASTM D 1248, "Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and Cable" 07/2006 02634- 1 of 5 CITY OF PEARLAND DUCTILE IRON PIPE AND FITTINGS 1.02 MEASUREMENT AN D PAYMENT A Unless indicated as a Bid Item,no separate payment will be made for ductile iron pipe and fittings under this Section. Include cost in Bid Items for Water Ma ins, Sanitary Sewage Force Mains, Gravity Sanitary Sewers, and Storm Sewers. 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350 - Submittals. B Submit Shop Drawings showing design of new pipe and fittings indicating alignment �! and grade, laying dimensions, fabrication, fitting, flange, and special details. Show station numbers for pipe and fittings corresponding to Plans. Production of pipe and fittings prior to review by the Engineer is at Contractor's risk. 1.04 QUALITY CONTROL A Provide manufacturer's certifications that all ductile iron pipe and fittings meet provisions of this Section and have been hydrostatically tested at factory and meet requirements of ANSI A21.51. B Provide certifications that all pipe joints have been tested and meet requirements of ANSI A21.11. 2.0 PRODUCTS 2.01 DUCTILE IRON PIPE A Ductile iron pipe barrels: ANSI A21.15,ANSI A21.50 or ANSI A21.51;bear mark of Underwriters'Laboratories approval;pressure classes as shown on the Plans. B Provide pipe sections in standard lengths,not less than 18 feet long,except for special g g P P fittings and closure sections as indicated on Shop Drawings. 2.02 JOINTS A Joint types: ANSI A21.11 push-on;ANSI A21.11 mechanical joint;or ANSI A21.15 L flanged end. Provide push-on joints unless otherwise indicated on the Plans or required by these specifications.For bolted joints,bolts shall conform to requirements of AWWA C111. B Where restrained joints for buried service are required by Plans, provide one of the following, or Approved Equal(restrained joints shall be polyethylene wrapped): e 1. Super-Lock Joint by Clow Corporation. 2. Flex-Ring or Lok-Ring by American Cast Iron Pipe Company. 3. TR-Flex Joint by U.S.Pipe and Foundry Company. C Threaded or grooved type joints which reduce pipe wall thickness below minimum required are not acceptable. 07/2006 02634-2 of 5 CITY OF PEARLAND DUCTILE IRON PIPE AND FITTINGS D Provide for restrained joints designed to meet test pressures required under Section 02676 - Hydrostatic Testing of Pipelines or Section 02533— Sanitary Sewage Force Mains, as applicable. 1 E Where ductile iron water main is cathodically protected from corrosion,bond rubber gasketed joints as shown on Plans to provide electrical continuity along entire pipeline, except where insulating flanges are required by Plans. 2.03 GASKETS A Furnish, when no contaminant is identified, plain rubber (SBR) gasket material; for flanged joints 1/8-inch thick gasket in accordance with ANSI A21.15. B Pipes to be installed in potentially contaminated areas,especially where free product is found near the elevation of the proposed pipeline, shall have the following gasket materials for the noted contaminants: CONTAMINANT GASKET MATERIAL REQUIRED Petroleum (diesel, gasoline) Nitrile Rubber Other contaminants As recommended by the pipe manufacture 2.04 FITTINGS A Use fittings of same size as pipe. Reducers are not permitted to facilitate an off-size fitting. Reducing bushings are also prohibited. Make reductions in piping size by reducing fittings. Line and coat fittings as specified for pipe they serve. B Push-on Fittings will not be allowed above grade. C Flanged Fittings: ANSI A21.10; ANSI B16.1 cast or ductile iron. Flanges: ANSI B16.1, Class 125;pressure rated at 250 psig. D Mechanical Joint Fittings: ANSI A21.10 (AWWA C110); pressure rated at 250 psi. E Ductile Iron Compact Fittings for Water Mains:ANSI A21.53 (AWWA C153);4-inch through 12-inch diameter;cement-mortar lining;conform to requirements of Section T 02630—Polyethylene Wrap. 2.05 COATINGS AND LININGS A Water Main Interiors: ANSI A21.4, cement lined with seal coat. B Sanitary Sewer and Force Main Interiors: 1 1. Preparation: Commercial blast cleaning conforming to SSPC-SP6. 2. Liner thickness: Nominal 40 mils,minimum 35 mils, for pipe barrel interior; minimum 6- 10 mils at gasket groove and outside spigot end to 6-inches back from end. 07/2006 02634-3 of 5 1 CITY OF PEARLAND DUCTILE IRON PIPE AND FITTINGS 3. Testing: ASTM G 62, Method B for voids and holidays; provide written certification. 4. Acceptable Lining Materials: a. Virgin polyethylene conforming to ASTM D 1248, with inert fillers C and carbon black to resist ultraviolet degradation during storage heat bonded to interior surface of pipe and fittings;"Polyline"by American Cast Iron Pipe Company; or Approved Equal. b. Polyurethane: Corro-pipe II by Madison Chemicals. c. Ceramic Epoxy: Protecto-401 by Enduron Protective Coatings. C Sanitary Sewer Point Repair Pipe: For pipes which will be lined with high density polyethylene liner pipe or cured-in-place liner,provide cement-lined with seal coat in accordance with ANSI A21.4. For pipes which will not be provided with named liner, provide pipe as specified in this Section, 2.05B "Sanitary Sewer and Force Main Interiors". D Exterior: Prime coat and outside asphaltic coating conforming to ANSI A21.10,ANSI A21.15, or ANSI A21.51 for pipe and fittings in open cut excavation and in casings. E Polyethylene Wrap: For buried water lines and sanitary sewers, including point repairs, provide polyethylene wrap unless otherwise specified or shown. Provide Polyethylene Wrap for all buried ductile iron pipe,including polyurethane coated pipe. F For flanged joints in buried service,provide petrolatum wrapping system,Denso, or Approved Equal, for the complete joint and all alloy steel fasteners. Alternatively, provide bolts made of Type 304 Stainless Steel. G Pipe to be installed in potentially contaminated areas shall have coatings and linings �—I recommended by the manufacturer as resistant to the contaminants. 2.06 MANUFACTURERS { A Pre-approved manufacturers of ductile iron are American Cast Iron Pipe Co.,McWane Cast Iron Pipe Co., and U. S.Pipe and Foundry Co. 3.0 EXECUTION 3.01 INSTALLATION A Conform to installation requirements of Section 02510—Water Mains,Section 02530 -Gravity Sanitary Sewers,and Section 02533—Sanitary Sewage Force Mains,except as modified in this Section. B Install in accordance with AWWA C600 and manufacturer's recommendations. C Install all ductile iron pipe in polyethylene wrap, unless cathodic protection is provided. Do not use polyethylene wrap with a cathodic protection system. 07/2006 02634-4 of 5 E CITY OF PEARLAND DUCTILE IRON PIPE AND FITTINGS 7 3.02 GRADE A Unless otherwise specified on Plans,install ductile iron pipe for water service to clear utility lines with following minimum cover: DIAMETER DEPTH OF COVER (INCHES) (FEET) 16 and 24 5 12 and smaller 4 END OF SECTION 1 1 1 i 7 7 I j 07/2006 02634-5 of 5 1 1 CITY OF PEARLAND ADJUSTING MANHOLES,INLETS,AND VALVE BOXES �I Section 02633 ADJUSTING MANHOLES,INLETS,AND VALVE BOXES 1.0 GENERAL 1.01 SECTION INCLUDES A Adjusting elevation of manholes,inlets, and valve boxes to new grades. 1 B References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 03300—Cast-in-Place Concrete 4. Section 02542—Concrete Manholes and Accessories 5. Section 02318—Excavation and Backfill for Utilities 6. Section 02910—Topsoil 7. Section 02921 —Hydromulch Seeding C Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM C 270, "Standard Specification for Mortar for Unit Masonry" 1.02 MEASUREMENT AND PAYMENT A Measurement for adjusting utility structures to grade is on a lump sum basis for: 1. Adjusting manholes. 2. Adjusting inlets. 1 3. Adjusting valve boxes. B Refer to Section 01200-Measurement and Payment Procedures. C Make Submittals required by this Section under the provisions of Section 01350 — Submittals. 1 2.0 PRODUCTS 2.01 CONCRETE MATERIALS A For cast in place concrete, refer to Section 03300—Cast-in-Place Concrete. B For precast concrete manhole sections and adjustment rings,refer to Section 02542— Concrete Manholes and Accessories. C For mortar mix, conform to requirements of ASTM C 270, Type S using Portland cement. I 07/2006 02633 - 1 of 3 E CITY OF PEARLAND ADJUSTING MANHOLES,INLETS,AND VALVE BOXES 2.02 CAST IRON ADJUSTING RINGS S A For cast iron adjusting rings, refer to Section 02542 — Concrete Manholes and Accessories. 2.03 PIPING MATERIALS A For riser pipes and fittings, refer to applicable piping materials specifications in Sections 02542—Concrete Manholes and Accessories. 3.0 EXECUTION 3.01 EXAMINATION • A Examine existing structure,valve box,frame and cover or inlet box,frame and cover or inlet,and piping and connections for damage or defects that would affect adjustment to grade. Report such damage or defects to the Engineer. 3.02 ESTABLISHING GRADE A Coordinate grade related items with existing grade and finished grade or paving,and relate to established bench mark or reference line. 3.03 ADJUSTING MANHOLES AND INLETS A Elevation of manhole or inlet can be raised using precast concrete rings or metal adjusting rings. Use of brick for adjustment to grade is prohibited. Elevation of manhole or inlet can be lowered by removing existing masonry, adjusting rings or the top section of the barrel below the new elevation and then rebuilding or raising the elevation to the proper height. CB Grout inside and outside adjusting ring joints. C Salvage and reuse cast iron frame and cover or grate. D Protect or block off manhole or inlet bottom using wood forms shaped to fit so that no debris or soil falls to the bottom during adjustment. E Set the cast iron frame for the manhole cover or grate in a full mortar bed and adjust to the established elevation. In streets, adjust covers to be flush to 1/8 inch above pavement. F Verify that manholes and inlets are free of visible leaks as a result of reconstruction. Repair leaks in a manner subject to the Engineer's approval. 3.04 ADJUSTING VALVE BOXES A If usable, salvage and reuse valve box and surrounding concrete block. C07/2006 02633-2 of 3 7 r'I CITY OF PEARLAND ADJUSTING MANHOLES,INLETS,AND VALVE BOXES B Remove and replace 6 inch ductile iron riser pipe with suitable length for depth of cover required to establish the adjusted elevation to accommodate actual finish grade. C Reinstall in-kind adjustable valve box and riser piping plumbed in vertical position. Provide minimum 6 inches telescoping freeboard space between riser pipe top butt end and interior contact flange of valve box for vertical movement damping. D After valve box has been set, aligned, and adjusted so that top lid is level with final grade, pour a 24 inch by 24 inch by 8 inch thick concrete pad around valve box. Center valve box horizontally within concrete slab. 3.05 BACKFILL AND GRADING 7 A Backfill the area of excavation surrounding each adjusted manhole, inlet, and valve box and compact according to requirements of Section 02318 — Excavation and Backfill for Utilities. B Grade the ground surface to drain away from each manhole and valve box. Place earth fill around manholes to the level of the upper rim of the manhole frame. Place earth fill around the valve box concrete block. C In unpaved areas,grade surface at a uniform slope of 1 to 5 from the manhole frame to natural grade. Provide a minimum of 4 inches of topsoil conforming to requirements of Section 02910—Topsoil and seed in accordance with Section 02921—Hydromulch Seeding. END OF SECTION 7 T 71 7 07/2006 02633-3 of 3 7 1 CITY OF PEARLAND CAST-IN-PLACE INLETS, �{ HEADWALLS,AND WINGWALLS j Section 02632 CAST-IN-PLACE INLETS,HEADWALLS,AND WINGWALLS 1.0 GENERAL 1.01 SECTION INCLUDES A Cast-in-place inlets for storm or sanitary sewers,including cast iron frame and plate or grate. B Cast-in-place headwalls and wingwalls for storm sewers. C References to Technical Specifications: 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 03300—Cast-in-Place Concrete 4. Section 02603—Frames, Grates,Rings, and Covers 5. Section 02318—Excavation and Backfill for Utilities D Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM C 270, "Standard Specification for Mortar for Unit Masonry" E Definitions: 1. Normal Depth Type A,Type B,Type C and Type E Inlets-Depth of 2.25 feet or less(2'3")plus pipe inside diameter when measured from grating,bottom of gutter, or throat to flow line of inlet lead. 2. Normal Depth Type BB Inlet - Depth of 2.55 feet (2' 6%") plus pipe inside diameter when measured from curb beam to flow line of inlet lead. 3. Extra Depth Inlet-Specified depth exceeding normal depth for the type inlet used. 1.02 MEASUREMENT AND PAYMENT A Measurement for normal depth inlets is on a per each basis, complete in. B Measurement for extra depth inlets is on a vertical foot basis for each foot in excess of normal depth,measured and complete in place. C Measurement for headwalls and wingwalls is on a per each basis, complete in place. D Payment for inlets and for culvert headwalls and wingwalls includes connection of lines and furnishing and installing frames, grates, rings and covers. E Refer to Section 01200—Measurement and Payment Procedures. 1 07/2006 02632- 1 of 3 1 CITY OF PEARLAND CAST-IN-PLACE INLETS, HEADWALLS,AND WINGWALLS 1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350— Submittals. B Submit Shop Drawings for approval of design and construction details for cast-in-place units which differ from units shown on Plans. C Submit manufacturer's data and details for frames, grates, rings, and covers. 2.0 PRODUCTS 2.01 MATERIALS A Concrete: Class A concrete with minimum compressive strength of 4000 psi conforming to requirements of Section 03300 — Cast-in-Place Concrete, unless wn anp by th E L' B Reinotherforcingise indi steel:cate d o ConformPlsor to a requirementsproved e of ngineer.Section 03300 — Cast-in-Place Concrete. C Mortar: Conform to requirements of ASTM C 270,Type S using Portland cement. D Miscellaneous metals: Cast-iron frames, grates, rings, and covers conforming to requirements of Section 02603—Frames, Grates,Rings, and Covers. 3.0 EXECUTION 3.01 EXAMINATION A Verify lines and grades are correct. B Verify compacted subgrade will support loads imposed by inlets. 3.02 INSTALLATION C A Construct inlets,headwalls,and wingwalls complete in place to the dimensions,lines and grades as shown on Plans. C B Excavate in accordance with requirements of Section 02318—Excavation and Backfill for Utilities. C The box section of inlet may be constructed of Class A concrete. CD Forms will be required for both the outside and inside faces of concrete inlet walls, however,if the nature of the material excavated for the inlet is such that it can be hand trimmed to a smooth vertical face,the outside forms may be omitted with approval of the Engineer. 07/2006 02632-2 of 3 E 1 CITY OF PEARLAND CAST-IN-PLACE INLETS, -y HEADWALLS,AND WINGWALLS E Place reinforcing steel to conform to details shown on the Plans. Provide a positive •-r means for holding steel cages in place during concrete placement. Welding of j reinforcing steel is not permitted unless noted on the Plans. The maximum variation in reinforcement position is plus or minus 10 percent of wall thickness or plus or minus 1/2 inch whichever is less. Regardless of variation, the minimum cover of concrete ' over reinforcement as shown on the Plans shall be maintained. F Chamfer exposed edges unless otherwise indicated on Plans. 3.03 FINISHES ^� A Cut off inlet leads neatly at the inside face of inlet wall. Point up with mortar. 1 B When the box section of the inlet has been completed, shape the floor of the inlet with mortar to conform to the detailed Plans. C Finish concrete surfaces in accordance with requirements of Section 03300—Cast-in- Place Concrete. J 3.04 INLET WATERTIGHNESS A Verify that inlets are free of visible leaks. Repair leaks in an approved manner. 3.05 BACKFILL A Backfill the area of excavation surrounding each completed inlet according to the requirements of Section 02318—Excavation and Backfill for Utilities. END OF SECTION 1 7 1 07/2006 02632-3 of 3 1 CITY OF PEARLAND PRECAST INLETS,HEADWALLS, AND WINGWALLS 7 Section 02631 7 PRECAST INLETS,HEADWALLS,AND WINGWALLS 1.0 GENERAL 7] 1.01 SECTION INCLUDES A Precast concrete inlets for storm or sanitary sewers,including cast iron frame and plate 7 or grate. B Precast concrete headwalls and wingwalls for storm sewers. 1 C References to Technical Specifications: 7 1. Section 01200—Measurement and Payment Procedures 2. Section 01350—Submittals 3. Section 01630—Product Options and Substitution 7 4. Section 03300—Cast-in-Place Concrete 5. Section 02542—Concrete Manholes and Accessories 6. Section 02318—Excavation and Backfill for Utilities 7 1 D Referenced Standards: 1. American Society for Testing and Materials (ASTM) a. ASTM C 76,"Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe b. ASTM C 270, "Standard Specification for Mortar for Unit Masonry" E Definitions: 1. Normal Depth Type A,Type B,Type C and Type E Inlets-depth of 2.25 feet or less(2'3")plus pipe inside diameter when measured from grating,bottom of 7 gutter, or throat to flow line of inlet lead. 2. Normal Depth Type BB Inlet- depth of 2.55 feet (2' 6 % ") plus pipe inside diameter when measured from curb beam to flow line of inlet lead. 3. Extra Depth Inlet- specified depth exceeding normal depth for the type inlet used. 7 1.02 MEASUREMENT AND PAYMENT f A Measurement for normal depth inlets is on a per each basis, complete in place. °" B When extra depth is specified on the Plans,measurement for extra depth inlets is on a vertical foot basis for each foot in excess of normal depth,measured and complete in place. C Measurement for headwalls and wingwalls is on a per each basis, complete in place. ,_., 1 D Payment for inlets and for culvert headwalls and wingwalls includes connection of lines, and furnishing and installing frames, grates, rings and covers. 07/2006 02631 - 1 of 4 7 C. CITY OF PEARLAND PRECAST INLETS,HEADWALLS, AND WINGWALLS E Refer to Section 01200—Measurement and Payment Procedures. C1.03 SUBMITTALS A Make Submittals required by this Section under the provisions of Section 01350— Submittals. B Submit Shop Drawings for approval of design and construction details for precast concrete inlets,headwalls and wingwalls. . C Submit proposals for using equivalent construction products or processes according to Section 01630—Product Options and Substitution. D Submit manufacturer's data and details for frames, grates,rings, and covers. 1.04 STORAGE AND SHIPMENT A Store precast units on level blocking. Do not place loads on them until design strength is reached. Shipment of acceptable units may be made when the 28 day strength requirements have been met. 2.0 PRODUCTS 2.01 MATERIALS A Concrete:Concrete for machine-made precast m e units meeting requirements of ASTM C C 76 regarding reinforced concrete, cement, aggregate, mixture, and concrete test. Minimum 28-day compressive strength shall be 4,000 psi. B Reinforcing steel: Conform to requirements of Section 03300 — Cast-in-Place Concrete. Place reinforcing steel to conform to details shown on Plans and as follows: 1. Provide a positive means for holding steel cages in place throughout production of concrete units. The maximum variation in reinforcement position is plus or minus 10 percent of wall thickness or plus or minus 1/2 inch whichever is less. Regardless of variation, the minimum cover of concrete over reinforcement as shown on the Plans shall be maintained. 2. Welding of reinforcing steel is not permitted unless noted on the Plans. C Mortar: Conform to requirements of ASTM C 270,Type S using Portland cement. D Miscellaneous metal: Cast-iron frames and plates conforming to requirements of Section 02542—Concrete Manholes and Accessories. E2.02 SOURCE QUALITY CONTROL A Tolerances: Allowable casting tolerances for concrete units are plus or minus 1/4 inch from dimensions shown on the Plans. Concrete thickness in excess of that required will not constitute cause for rejection provided that such excess thickness does not interfere with proper jointing operations. 07/2006 02631 -2 of 4 CITY OF PEARLAND PRECAST INLETS,HEADWALLS, AND WINGWALLS B Precast Unit Identification: Mark date of manufacture and name or trademark of manufacturer clearly on the inside of inlet, headwall or wingwall. C Rejection: Precast units may be rejected for non-conformity with these specifications and for any of the following reasons: 1. Fractures or cracks passing through the shell,except for a single end crack that does not exceed the depth of the joint. 2. Surface defects indicating honeycombed or open texture. 3. Damaged or misshaped ends, where such damage would prevent making a satisfactory joint. D Replacement: Immediately remove rejected units from the work site and replace with acceptable units. E Repairs: Occasional imperfections resulting from manufacture or accidental damage may be repaired if, in the opinion of the Engineer, repaired units according to requirements of these specifications. 1 3.0 EXECUTION 3.01 EXAMINATION I A Verify lines and grades are correct. B Verify compacted subgrade will support loads imposed by inlets. 3.02 INSTALLATION 1 A Install inlets,headwalls,and wingwalls complete in place to the dimensions,lines and grades as shown on the Plans. B Excavate in accordance with requirements of Section 02318—Excavation and Backfill for Utilities. C Bed precast concrete units on cement stabilized sand on foundations of firm, stable material accurately shaped to conform to the shape of unit bases. D Provide adequate means to lift and place concrete units. 3.03 FINISHES A Use a cement-sand mortar mix to seal joints, fill lifting holes, and as otherwise required. •'7 B When the box section of the inlet has been completed,shape the floor of the inlet with mortar to conform to Plans details. --� C Accurately adjust cast iron inlet plate frames to line,grade,and slope. Grout frame in place with mortar. 07/2006 02631 -3 of 4 1 CITY OF PEARLAND PRECAST INLETS,HEADWALLS, AND WINGWALLS 3.04 INLET WATERTIGHTNESS A Test each inlet for leaks. Verify that inlets are free of visible leaks. Repair leaks in an approved manner. 3.05 CONNECTIONS A Connect inlet leads to the inlets as shown on the Plans. Use non-shrink jointing material as shown on the Plans or as approved. Make connections water tight. 3.06 BACKFILL A Backfill the area of excavation surrounding each completed inlet, headwall or wingwall according to the requirements of Section 02318—Excavation and Backfill for Utilities. END OF SECTION 07/2006 02631-4 of 4