Loading...
R2009-052 - 2009-04-13RESOLUTION NO. R2009-52 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING A CONTRACT FOR CONSTRUCTION MATERIALS TESTING SERVICES ASSOCIATED WITH THE UNIVERSITY OF HOUSTON CAMPUS. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract for construction materials testing services associated with the University of Houston Campus, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract for construction materials testing services associated with the University of Houston Campus. PASSED, APPROVED and ADOPTED this the 13th day of April, A.D., 2009. ~-~ TOM REID MAYOR ATTEST: i~ f ~~ ~~. YOWNG L REIN MC C-1T~' SE ~ RETARY APPROVED AS TO FORM: ~~ ~ ~1•~ ~_ DARRIN M. COKER CITY ATTORNEY Exhibit "A" Resolution 2009-52 FA0801 CONTRACT C'OK PROFESSIONAL SERVICES THIS CONTRACT is entered into on _4/13/09 by and between the City of Pearland ("CITY") and Geotest Engineering, Inc. ("CONSULTANT"). The CITY engages the CONSULTANT to perform Materials Testing Services for a project I:nown and described as University of Houston (Project # FA0801). SECTION I -SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A. The CONSULTANT shall perform materials testing services in connection with the preparation of construction plans, and technical specifications. See Exhibit A, attached, for a detailed SCOPE OF WORK. The PROJECT schedule shall conform to the construction schedule. B. The CONSULTANT shall prepare and submit a detailed opinion of estimated cost of the PROJECT. C. The CONSULTANT acknowledges that the CITY (through its employee handbook) considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the CITY. The CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY employee to engage in such misconduct. D. The CONSULTANT recognizes that all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. E. The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any en•ors and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. -1- (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occu~-~-ence, and $1,000,000 for each occun-ence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non-owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occun-ence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in limits ("Change in Coverage") except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT, CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT'S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. F. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the CONSULTANT, his officers, employees, agents, or subcontractors under this CONTRACT. G. All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. SECTION II - PCRIOD OF SERVICE This CONTRACT will be binding upon execution and end upon completion of the construction related work not to exceed 24 months after execution of this contract. -2- SECTION III -CONSULTANT'S COMPENSATION A. The method of payment for this CONTRACT is time and materials. Total compensation for the services performed shall be to a maximum of $90,355.50. B. The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT. C. The CITY shall make payments to the CONSULTANT within thirty (30) days after receipt and approval of a detailed invoice. Invoices shall be submitted on a monthly basis. SECTION IV -THE CITY'S RESPONSIBILITIES A. The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B. The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize delay in the progress of the CONSULTANT'S work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of the work. The CONSULTANT agrees that the CITY'S inspection, review, acceptance or approval of CONSULTANT'S work shall not relieve CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or its sub-consultant(s) or in any way affect the CONSULTANT's status as an independent contractor of the CITY. SECTION V -TERMINATION A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason - - with or without cause -- by delivering written notice to CONSULTANT personally or by certified mail at 5600 Binliff Drive, Houston, Texas 77036. Immediately after receiving such wrtten notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials supplied by the CITY on or before the 15`~ day following termination of the CONTRACT. C. In the event of such termination, the CONSULTANT shall be paid for services performed prior- to receipt of the written notice of termination. The CITY shall make final payment within sixty (60) days after the CONSULTANT has delivered -3- to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D. If the remuneration scheduled under this contract is based upon a fixed fee or definitely ascertainable sum, the portion of such sum payable shall be proportionate to the percentage of services completed by the CONSULTANT based upon the scope of work. E. In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. F. If the CITY terminates this CONTRACT for cause and/or if the CONTRACTOR breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for- any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney's fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under- this CONTRACT. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. SECTION VI -ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. SECTION VII -COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona tide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability, and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent fee that has been paid. -4- SECTION VIII- SUCCESSOKS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. The parties have executed this CONTRACT this 13th day of Apri 1 2009 Bill Eisen -City Manager City of Pearland 4/13/09 G otest Engineer ,Inc. -5- RECEI~/ED MAR 1 g 09 GEOTEST ENGINEERING, INC. c~tiofPe~~ia„~ Caeotechnical Engineers & Materials Testing Pio,ects Dear 5600 Bintliff Drive Houston, Texas 77036 Telephone: (713) 266-0588 Fax: (713) 266-2977 Proposal No.1150-2132-01 Skipper Tones, MPM, CIPM Project Manager, Projects Dept. City of Pearland 3519 Liberty Drive Pearland, TX 77581 Re: Design Build for University Campus Dear: Mr. Tones, Geotest Engineering, Inc. appreciates the opportunity to submit our proposed scope of services and budget estimate to provide materials testing services on the above referenced project. Based on the proposed scope of services, we estimate a budget of $90,355.50. Any additional services requested and not part of this estimate will be charged in accordance with our standard fee schedule. Geotest appreciates the opportunity to work with you. If you have any questions or require additional information, please contact me at your convenience. Sincerely, GEOTEST ENGINEERING, INC. ,~, - .~c N. Isbell, S.E.T" CMT Manager ~~~ GTH0001ACM"I" Proposals\1 1 502 1 330 1 Copies Submitted. Enclosures Cost Estimate Geotest Engineering Budget Estimate Design Build for University Campus Service Billing Codes Quantity Unit Unit Rate Estimate 1.0 Earthwork Building Subgrade and Pad, Site Utilities, Pavement Subgrade, Misc. Earthwork Engineering Technician Engineering Technician, (OT) Vehicle Charge Nuclear Gauge Lime Determination Moisture Density Relationship(treated,select fill,subgrade) Atterberg Limits Additional Atterberg Limits for verification (average 3 per lift) Percent Passing 200 Sieve (-200) 8.0 300 Hour $ 53.00 $ 15,900.00 8.5 100 Hour $ 79.50 $ 7,950.00 18.0 60 Trip $ 60.00 $ 3,600.00 1013.0 60 Day $ 60.00 $ 3,600.00 1011.0 4 Each $ 178.00 $ 712.00 1006.0 24 Each $ 175.00 $ 4,200.00 1001.0 12 Each $ 53.00 $ 636.00 1001.0 24 Each $ 53.00 $ 1,272.00 1004.0 12 Each $ 45.00 $ 540.00 Total: $ 38,410.00 2.0 Drilled Footing Foundation Est. 200 Piers at 25 Piers Per Day Engineering Technician 8.0 40 Hour $ 53.00 $ 2,120.00 Engineering Technician, (OT) 8.5 8 Hour $ 79.50 $ 636.00 Vehicle Charge 18.0 5 Trip $ 60.00 $ 300.00 Cylinder Tests (4 cyl/set) 203.0 25 Each $ 15.00 $ 375.00 Total: $ 3,431.00 3.0 Concrete for Slab on Grade,Grade Beams,Tilt Up Walls, Elevated Deck, Misc. Concrete Engineering Technician 8.0 100 Hour $ 53.00 $ 5,300.00 Engineering Technician, (OT) 8.5 24 Hour $ 79.50 $ 1,908.00 Vehicle Charge 18.0 20 Trip $ 60.00 $ 1,200.00 Cylinder Tests (4 cyl/set) 203.0 120 Each $ 15.00 $ 1,800.00 Total: $ 10,208.00 4.0 Pre-Cast Plant Visit Within 100 Mile Radius of Project Engineering Technician, 2 Visits at 10 hrs/Visit 8.0 16 Hour $ 53.00 $ 848.00 Engineering Technician, (OT) 8.5 4 Hour $ 79.50 $ 318.00 Vehicle Charge 18.0 2 Trip $ 60.00 $ 120.00 Total: $ 1,286.00 5.0 Parking and Pavement Est. 4730 cy, 500 cy Placements Engineering Technician 8.0 140 Hour $ 53.00 $ 7,420.00 Engineering Technician, (OT) 8.5 45 Hour $ 79.50 $ 3,577.50 Vehicle Charge 18.0 30 Trip $ 60.00 $ 1,800.00 Cylinder Tests (4 cyl/set) 203.0 192 Each $ 15.00 $ 2,880.00 Total: $ 15,677.50 Service Quantity Unit Unit Rate Estimate 6.0 Masonary Engineering Technician 8.0 16 Hour $ 53.00 $ 848.00 Mortar Cubes (6 Per Set) 213.0 2 Set $ 102.00 $ 204.00 Grout Prism (6 Per Set) 215.0 2 Set $ 102.00 $ 204.00 Vehicle Charge 18.0 2 Trip $ 60.00 $ 120.00 Total: $ 1,376.00 7.0 Bolted and Welded Connections Certified Welding Inspector UT Testing Equipment Vehicle Charge 12.0 84 Hour $ 77.00 $ 6,468.00 704.0 5 Day $ 67.00 $ 335.00 18.0 16 Trip $ 60.00 $ 960.00 Total: $ 7,763.00 8.0 Fireproofing Engineering Technician Fireproofing Density Testing Vehicle Charge 8.0 30 Hour $ 53.00 $ 1,590.00 902.0 5 Each $ 58.00 $ 290.00 18.0 5 Trip $ 60.00 $ 300.00 Total: $ 2,180.00 9.0 Roofing Observations Lightweight insulating Concrete Sampling 8.0 20 Hour $ 53.00 $ 1,060.00 Lightweight Samples for compressive Stregth (6 Per Set) 203.0 4 Set $ 102.00 $ 408.00 Roofing Inspector (3 Weeks For 40 Hrs/Week) 7.0 120 Hour $ 58.00 $ 6,960.00 Vehicle Charge 18.0 15 Trip $ 60.00 $ 900.00 Total: $ 9,328.00 10.0 Project Management Project Management & Administration 5.0 12 Hour $ 58.00 $ 696.00 Total: $ 696.00 Total Estimated Budget ~ 9O,355.5U Remarks Note: A Minimum Of 4 Hours Will Be Charged at The Applicable Rate For All Technician/Inspector Services. And an Overtime Rate Of 1.5 Times The Hourly Rate Is Applicable For All Hourly Employees. GEOTEST ENGINEERING, INC. 5600 Bintliff Drive Houston, Texas 77036 Tel (713) 266-0588 CONSTRUCTION MATERIALS Fee schedule For Pearland Page 1 of 5 Unit Rate PERSONNEL 10200 Senior Engineer, P.E. (10 years experience) $123.00 / Hr 10700 Technician NICET II, ACI level 1 $53.00 / Hr 10701 Technician NICET II, ACI level 1 (OT) $79.50 / Hr 11000 Senior Welding Inspector, SCWI $100.00 / Hr 11001 Senior Welding Inspector, SCWI OT $150.00 / Hr 11100 Welding Inspector, CWI, ACCP II $77.00 / Hr 11101 Welding Inspector, CWI, ACCP II OT $115.50 / Hr 11200 Associate Welding Inspector (ACWI) $56.00 / Hr 11201 Associate Welding Inspector (ACWI) OT $84.00 / Hr 11300 Inspector, ASNT III $96.00 / Hr 11301 inspector, ASNT III OT $144.00 / Hr 11400 NDT Inspector II w/ Asst. (2 man crew) $101.00 / Hr 11401 NDT Inspector II w/Asst. (2 man crew) OT $151.50 / Hr 11500 Support Personnel (Word Processing) $36.00 / Hr 15000 Vehicle Charge $60.00 Trip 15100 REIMBURSABLE EXPENSES Cost plus 10% 15200 Services provided by quotation AGGREGATES 20100 Sieve Analysis -Coarse Aggregates (C 136 - C) $46.00 I Ea 20200 Sieve Analysis -Fine Aggregates (C 136 - F) $46.00 / Ea 20300 Rel.Density &Abs. -Coarse Aggregates (C 127) $70.00 / Ea 20400 Re.Density &Abs. -Fine Aggregates (C 128) $85.00 / Ea 20500 Bulk Density & Voids in Aggregate (C 29) $33.00 / Ea 20600 Absorption -Coarse Aggregates (C 127) $39.00 / Ea 20700 Absorption -Fine Aggregates (C 128) $39.00 I Ea 20800 Finer than 75 um(No. 200) Sieve (C 117) $42.00 I Ea 20900 Organic Impurities in Fine Aggregates (C 40,C 131 or C) $41.00 / Ea 21000 L.A. Abrasion (-535) $179.00 / Ea 21100 Clay Lumps and Friable Particles (C 142) $47.00 / Ea 21200 Lightweight Particles (C 123) $55.00 / Ea 21300 Sand Equivalent (D-2419) $56.00 I Ea 21400 Na/Mg Sulfate Soundness (5 cycles) (C 88) $304.00 I Ea 21500 Na/Mg Sulfate Soundness (Add'I cycles) (C 88) $175.00 / Ea GEOTEST ENGINEERING, INC. 5600 Bintliff Drive Houston, Texas 77036 Tel (713) 266-0588 Page 2 of 5 Unit Rate PORTLAND CEMENT CONCRETE 30100 Compressive Str. (Cylinder) (C-39) $15.00 / Ea 30200 Flexural Str.( Beam) (C-78) $23.00 / Ea 30300 Split Tensile Str. (Incl. Prep) (C 496) $94.00 / Ea 30400 Time of Set by Penetration (C 403) $275.00 / Ea 30500 Linear Shrinkage & Thermal Coef (Bar) (C 531) $282.00 Set of 3 30600 Leng Cha of Hydra-Cement Mortar and Conc C 490 & C 157 $100.00 Set of 3 30700 Density of Structural Ltwt. Concrete (C 567) $70.00 /Ea 30800 Concrete Coring, Minimum Charge (C 42) $290.00 Min 30900 Concrete Coring (4" diameter to 6" Thickness) (C 42) $90.00 / Ea 31000 Concrete Coring, additional thickness (6" to 12") (C 42) $8.00 In. 31100 Concrete Coring, additional thickness (Over 12") (C 42) $10.00 In. 31200 Preparation of Core, Cap & Test (C 42) $67.00 / Ea 31300 Measuring Length of Core (C 174) $11.00 /Ea 31400 Pachometer Survey (Magnetic Induction) $78.00 Day 31500 Probe Penetration Test Equipment (plus probes) (C 803) $79.00 Day HMAC 40100 Mix Design Review $187.00 /Ea 40200 HMAC Design (In-Place) $1,870.00 /Ea 40300 Trail Batch (up to 5 points) $1,403.00 /Ea 40400 Additional Points $202.00 /Ea 40500 Extraction/Gradation (Tex - 210F) $174.00 /Ea 40600 Specific Gravity (D 2041 & 201 F) $62.00 /Ea 40700 HVEEM Stability (Tex - 208F) $82.00 Set 40800 Bulk Density -Lab Molded or Core (Tex - 207F) $46.00 Set 40900 Bulk Density Core (Tex - 207F) $41.00 /Ea 41000 Molding Specimens (Tex - 206F) $54.00 Set 41100 Maximum Theoretical Specific Gravity (Tex - 227F) $78.00 /Ea 41200 Apparent Specific Gravity (Tex - 202F) $58.00 /Ea 41300 Abson Recovery (Tex - 211 F) $281.00 /Ea 41400 Moisture Susceptibiltiy (Tex - 531 C) $409.00 /Ea 41500 Penetration (D 5) $74.00 /Ea 41600 Ductility (D 113) $99.00 /Ea 41700 Viscosity (D 2170) $82.00 /Ea 41800 Asphalt Coring, Minimum Charge $290.00 Min 41900 Asphalt Coring (4" Dia. To 6" Thickness) $80.00 /Ea 42000 Asphalt Coring (4" Dia. Over 6" Thickness) $7.00 In. 42100 Asphlat Core Measurement $8.00 /Ea 42200 Measuring Thickness of Asphalt $8.00 IEa 42300 PMA Extraction/Gradation (D 2172) $234.00 /Ea 42400 PMA Extraction/Gradation (D 6307) $145.00 /Ea 42500 Asphalt Content (D 4125) $70.00 /Ea STRUCTURAL STEEL 50100 Radiographic Source, Iridium $106.00 Day 50200 Radiographic Source, Cobalt 60 $122.00 Day 50300 Ultrasonic equipment (E 114,E 273,E 587 & E 797) $78.00 Day 50400 Magnetic Particle Inspection Equipment (E 709) $29.00 Day 50500 Skidmore-Wilhelm Tension Indicator $117.00 Day 50600 Torque Wrench $35.00 Day 50700 Discontinuity (Holiday) Equipment $82.00 Day 50800 Dry Film Thickness Equipment (Tooke Gauge) (D 4138) $29.00 Day 50900 Dry Film Thickness Equipment (Magnetic) (D 7091) $29.00 Day MASONRY 60100 Compressive Strength, Mortar Cubes (C 109) $120.00 Set 6 60200 Compressive Strength, Mortar Cubes (C 109) $20.00 / Ea 60300 Compressive Strength, Mortar or Grout Cyl. (C 780/C 39) $20.00 / Ea 60400 Compressive Strength, Grout Prisms (C 1019) $120.00 Set 3 60500 Measurement, Brick (C 67) $47.00 / Ea 60600 Compressive Strength Test, Brick (C 67) $28.00 1 Ea 60700 Flexural Strength Test, Brick (C 67) $37.00 / Ea 60800 Absorption of Brick, 24 hr (C 67) $62.00 / Ea 60900 Absorption of Brick, 5 hr (C 67) $61.00 / Ea 61000 Measurement, CMU (C 140) $25.00 / Ea 61100 Weight, CMU (C 140) $70.00 / Ea 61200 Moisture Content, CMU (C 140) $70.00 / Ea 61300 Compressive Strength, CMU (C 140) $75.00 / Ea 61400 Compressive Strength, CMU Hollow Prism (C 1314) $117.00 / Ea FIREPROOFING 70100 Density of SFRM (E 605) $33.00 / Ea 70200 Cohesion/Adhesion of SFRM (E 736) $25.00 ! Ea GEOTEST ENGINEERING, INC. 5600 Bintliff Drive Houston, Texas 77036 Tel (713) 266-0588 Page 3 of 5 Unit Rate ROOFING 80100 Cut Out Roofing Sample Evaluation (D 2928) $303.00 / Ea 80200 Moisture in Mineral Aggregate for BUR (D 1864) $51.00 / Ea 80300 Analysis of New Built-Up Roof Membranes (D 3617) $279.00 / Ea 80400 Compressive Str. Of Ltwt. Insul. Concrete (C 495) $98.00 Set of 4 80500 Compressive Str. Of Ltwt. Insul. Concrete (C 495) $26.00 / Ea 80600 Unit Weight of Ltwt. Insul. Concret (C 495) $44.00 Set of 2 SOILS 90100 Liquid & Plastic Limits (D 4318) $53.00 / Ea 90200 Moisture Content of Soil by Mass (D 2216) $8.00 / Ea 90300 Moisture Content by Microwave (D 4643) $26.00 / Ea 90400 Sieve Analysis (D 422) $49.00 / Ea 90500 Sieve Analysis w/ Hydrometer (D 422) $110.00 / Ea 90600 Percent Passing #200 Sieve (D 1140) $41.00 / Ea 90700 Specific Gravity (D 854) $51.00 / Ea 90800 pH of Soils (D 4972) $15.00 / Ea 90900 Unconfined Compressive Strength (D 2166) $39.00 I Ea 91000 Unconsolidated-undrained Triaxial Compression (D 2850) $54.00 I Ea 91100 Permeability -Constant Head (D 2434) $199.00 / Ea 91200 One-Dimensional Consolidation (D 2435) $310.00 / Ea 91300 Consolidation, Additional Increment (D 2435) $44.00 / Ea 91400 Dispersive Characteristics By Pinhole Test (D 4647) $246.00 / Ea 91500 Dispersive Characteristics by Crumb Test (D 6572) $33.00 / Ea 91600 Double Hydrometer (D 4221) $152.00 / Ea 91700 Soil Suction -Filter Paper $49.00 / Ea 91800 Additional Increment $45.00 / Ea 91900 California Bearing Ration (D 1883) $185.00 / Ea 92000 Soil Shrinkage Factors by Mercury Method (D 427) $54.00 / Ea 92100 Soil Shrinkage Factors by Wax Method (D 4943) $65.00 / Ea 92200 One-Dimensional Swell, Cohesive Soil (D 4546) $251.00 I Ea 92300 OMD Standard Compaction (D 698) $175.00 I Ea 92400 OMD Modified Compaction (D 1557) $187.00 I Ea 92500 Max. & Min. Density-Sand (D 4253ID 4254) $182.00 / Ea 92600 Percent Solids in Lime Slurry $37.00 / Ea 92700 Optimum Lime Content - pH Method (D 6276) $202.00 / Ea 92800 Optimum Lime Content - PI Method $208.00 / Ea GEOTEST ENGINEERING, INC. 5600 Bintliff Drive Houston, Texas 77036 Tel (713) 266-0588 Page 4 of 5 TREATED SOILS Unit Rate 94100 Cement Sand Compressive Str. (D 1633) $61.00 / Ea 94200 Cement Content of Soil-Cement (D 806) $269.00 / Ea 94300 Sieve Analysis -Base Material (C 136) $82.00 / Ea 94400 Compressive Str. Treated Base (Tex - 120E) $222.00 / Ea 94500 OMD Strength Compaction, Treated (D 698) $193.00 / Ea 94600 OMD Standard Compaction, Treated (D 1557) $205.00 / Ea 95100 Nuclear Density Gauge (D 6938) $9.00 I Hr SLIP-LINING AND MANHOLE REPAIR 100100 Coring/Drilling of Manhole Grout $52.00 Hole 100200 Coring and strength of Gunite Panel $105.00 Core 100300 Flexural Str./Modulus of Elasticity of Liner (D 790) $295.00 Coupon GEOTEST ENGINEERING, INC. 5600 Bintliff Drive Houston, Texas 77036 Tel (713) 266-0588 Page 5 of 5 Unit Rate GEOTECHNICAL 11010 Soil Boring, Intermittant 3-in. dia. (0 to 50') $16.00 / Ft 11020 Soil Borings, Intermittant 3-in. dia. (51' to 100') $18.00 / Ft 11030 Soil Boring, Continuous 3-in. (0 to 20') $18.00 / Ft 11040 Soil Boring over 100' (Surchage) $6.00 / Ft 11050 Wash Boring $8.00 / Ft 11060 Auger Boring $9.00 I Ft 11070 Undisturbed/ Split-Spoon Sample in Wash/ Auger Borings $34.00 / Ea 11080 Grouting of Completed Boring $5.00 / Ft 11090 A.T.V. Surcharge $6.00 I Ft 11100 Minimum Charge (to be used when charges are less than $718.00) $672.00 / LS 11110 Mobilization/ Demobilization $300.00 / LS 11120 TDH Cone Penetration Test $23.00 Ea. 11130 ATV Mobilization Surcharge $117.00 / LS 11140 Portable Rig Drilling (Crew of Two) $152.00 / Hr 11150 Standby (Crew of Two) $146.00 / Hr pc5lfees ch ed u le/2008h cp id ACORD CERTIFICATE OF LIABILITY INSURANCE OP ID WAJI DATE (MM/DD/YYYY) GEOENCI 04 03 09 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Swantner ~ Gordon Ins Agcy-HO HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 1500 Citywest Blvd Suite 500 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Houston TX 77042 Phone:713-952-9990 Fax:713-952-9939 INSURERS AFFORDING COVERAGE NAIC# INSURED INSURERA. Evanston Insurance Co 35378 wsuRER B: Hartford Fire Ins Co 19682 Geotest Engineering, Inc. INSURERC Texas Mutual Ins Co 22945 5600 Bintliff Drive H t TX 77036 INSURER D. ous on INSURER E: R ~~'~ "' COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING qPR 0 7 09 ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH City UI PAC IU d POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR NSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE DATE MMIDD/YY P LICY EXPIRATION DATE MM/DD/YY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1 , OOO , OOO A X COMMERCIAL GENERAL LIABILITY 08PKG00188 10/01/08 10/01/09 PREMISES (Eaoccurence> $50,000 CLAIMS MADE ~ OCCUR MED EXP (Any one person) $ 5 , 000 PERSONAL 8 ADV INJURY $ 1 , OOO , OOO GENERAL AGGREGATE $ 3 , OOO , OOO GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS -COMP/OP AGG $ 3 , 000 , 000 X POLICY PRO LOC JECT AUT OMOBILE LIABILITY COMBINED SINGLE LIMIT (Ea accident) $ 1 000 000 $ X ANY AUTO 61UUNK02815 10/01/08 10/01/09 ALL OWNED AUTOS BODILY INJURY SCHEDULED AUTOS (Per person) $ HIRED AUTOS BODILY INJURY NON-OWNED AUTOS (Per accident) $ PROPERTY DAMAGE (Per accident) $ GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY. AGG $ EXCESS/UMBRELLA LIABILITY EACH OCCURRENCE $ OCCUR ~ CLAIMS MADE AGGREGATE $ DEDUCTIBLE $ RETENTION $ $ WORKERS COMPENSATION AND X TORY LIMITS ER C EMPLOYERS'LI.4l31LITY ANY PROPRIETOR/PARTNER/EXECUTIVE TSFOOOli44087 04/28/09 04/28/10 E. L. EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? E.L. DISEASE - EA EMPLOYEE - $ 1 , 000 , 000 _ If yes, describe under SPECIAL PROVISIONS below E.L. DISEASE -POLICY LIMIT $ 1 , 000 , 000 OTHER A Pollution Liabilit 08PKG00188 10/01/08 10/01/09 Condition 1,000,000 A Professional Liab OSPKG00188 10/O1/OS 10/01/09 Claims Ma 1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS I VEHICLES /EXCLUSIONS ADDED BY ENDORSEMENT /SPECIAL PROVISIONS Professional Liability Deductible $50,000 fi4o8b~ Pollution Liability Deductive $50,000 See Notepad for any additional information CERTIFICATE HOLDER CANCELLATION CI PE-PE SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL l O DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL City of Pearland Attn: Skipper Jones PE IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR 3519 Llberty Dr . REPRESENTATIVES. Pearland TX 77581 AU ORIZED RE ENTA VE ACORD 25 (2001/08) ©ACORD CORPORATION 1988 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 25 (2001/08) ~ v ' `~' • ^'"' ^ INSURED'S NAME Geotest En I ',City of Pearland is addl insured on above Comp & Professional Liability. Waiver of Subrogation in favor of the City except not under Professional Liability. gineering, Ine. OP ID WADI policies except not for Worker's of Pearland on all policies DATE 04/03/09