Loading...
R2000-017 02-14-00RESOLUTION NO. R2000-17 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO ENTER INTO A CONTRACT WITH THE STATE OF TEXAS, BY AND THROUGH THE TEXAS DEPARTMENT OF TRANSPORTATION, ALLOWING SELECTION OF AN ENGINEERING FIRM TO PREPARE THE PRELIMINARY ENGINEERING AND ENVIRONMENTAL ASSESSMENTS FOR PORTIONS OF THE McHARD ROAD AND PEARLAND PARKWAY EXTENSION PROJECTS. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and the State of Texas, by and through the Texas Department of Transportation, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract with the State of Texas, by and through the Texas Department of Transportation, allowing selection of an engineering firm to prepare the preliminary engineering and environmental assessments for portions of the McHard Road and Pearland Parkway extension projects. PASSED, APPROVED and ADOPTED this February , A.D., 2000. ATTEST: Yi~NG LC~Z. NG' SEQ~,ETARY the 14th day of TOM REID MAYOR RESOLUTION NO. R2000-17 APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY 2 Brazoria County CSJ 0912-31-914 CS: McHard Road From SH 35 to the Harris County Line in Pearland Harris County CSJ 0912-71-904 CS: McHard Road From BW 8 to the Brazoria County Line in Pearland THE STATE OF TEXAS THE COUNTY OF TRAVIS AGREEMENT (HIGH PRIORITY PROJECTS PROGRAM) THIS AGREEMENT, is made by and between the State of Texas, acting by and through the Texas Department of Transportation, hereinafter called the "State" and the Cityof Pearland, Texas, hereinafter called the "City", acting by and through its governing body the City Council. WITNESSETH WHEREAS, the Intermodal Surface Transportation Efficiency Act of 1991, ("ISTEA") codified under Title 23 U.S.C. Section 101 et seq., establishes the National Intermodal Transportation System that is economically efficient and environmentally sound, provides the foundation for the nation to compete in the global economy, and will move people and goods in an energy efficient manner; and WHEREAS, Title 23 U.S.C. Section 117 as amended by Section 1601 of the Transportation Equity Act for the 21st Century (TEA-21) establishes that funds shall be made available to carry out the High Priority Project Programs and that the Federal share of funding will not exceed eighty percent (80%) of the Project cost; and 1/13/00 Page 1 of 18 WHEREAS, the State and the City desire to construct McHard Road on new location from BW 8 to SH 35, as shown in "Exhibit A", to be hereinafter identified as the "Project"; and WHEREAS, on the day of May, , the Peadand City Council passed Resolution No. , attached hereto and identified as "Exhibit B", authorizing the City's participation in the development of the Project; and WHEREAS, the State will secure the Federal cost share, review the engineering and PS&E, let the construction contract, provide the construction inspection, and provide other items as required; and WHEREAS, the State and the City executed an agreement on August 3, 1994 that includes the performance of all preliminary engineering on the north-south segment of the McHard Project from BW 8 to the Future Pearland Parkway, as shown in Exhibit A; and WHEREAS, the State and the City agree that the scope of the subject Project will not include the preliminary engineering for the north-south segment of the McHard Project from BW 8 to the Future Pearland Parkway; and WHEREAS, the City has offered to participate in the development and construction of the Project by providing funding, by preparing or having prepared by a consultant the preliminary engineering, for the east-west segment of the Project from SH 35 to the Future Pearland Parkway only, which includes, but is not limited to, environmental documentation and clearances, public involvement and all necessary and required environmental mitigation. The City has also offered to participate in the development of the design plans, specifications, and estimates (PS&E); accomplishing the adjustment of utilities; acquisition of right of way; and providing other necessary items required by the State for both segments of the Project; and WHEREAS, the Project has been designated as a High Priority Project and has been approved through the United States Congress to receive Federal funding under, TEA-21, a page of which is attached hereto and identified as "Exhibit C." 1/13/00 Page 2 of 18 AGREEMENT NOW, THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the parties hereto, to be by. them respectively kept and performed as hereinafter set forth, it is agreed as follows: 1. CONTRACT PERIOD This agreement becomes effective upon final execution by the State and shall terminate upon completion of the Project or unless terminated or modified as hereinafter provided. 2. SCOPE OF PROJECT A. The State and the City agree that the scope of the Project shall be limited to the scope authorized by the Texas Transportation Commission. The scope of the Project includes preparation of the environmental assessment, right of way maps, property descriptions, aerial photogrammetry, schematic layout, performing field surveys, conducting public meetings/hearings for the east-west segment of the McHard Project from SH 35 to the Future Pearland Parkway. These same tasks will be accomplished for the north-south segment of the McHard Project from BW 8 to the Future Pearland Parkway by a separate Project. The scope of work will also include accomplishing adjustment of utilities, preparing plans, specifications and estimates (PS&E), and any other work necessary to complete both segments of the Project as applicable. B. The Project will be designated as a METROPOLITAN HIGHWAY for the limited purpose of constructing the roadway facility; however, any existing city street within the limits of the Project will not be so designated or incorporated therein. C. The City will continue to provide maintenance for all City roads within the limits of the Project until the State's award of the construction contract. 1/13/00 Page 3 of 18 = CITY RESPONSIBILITIES A. The City will prepare or cause to be prepared the Project's preliminary engineering and environmental documents for the east-west segment of theMcHard Project from BW 8 to the Future Pearland Parkway only. These same tasks will be accomplished for the north-south segment of the McHard Project from BW 8 to the Future Pearland Parkway by a separate Project. The preparation of the design plans, specifications and estimates necessary for the development of both segments of the Project will be part of the scope of work. Development of the preliminary engineering and environmental documents, for the east-west segment of the McHard Project from BW 8 to the FuturePearland Parkway only, shall include, but not be limited to, preparing the environmental assessment, right of way mapping, aerial photogrammetry, property descriptions and schematic layout; performing field surveys and conducting public meetings/hearings. B. The City shall provide to the State environmental reports for the east-west segment of the McHard Project from BW 8 to the Future Pearland Parkway only, to be submitted to the appropriate regulatory agency(s), and shall provide documentation to the satisfaction o~ these regulatory agency(s) that the environmental problems have been remedied. The environmental document for the north-south segment of the McHard Project from BW 8 to the Future Pearland Parkway will be produced as part of a separate Project. The State will not let the construction contract for the Project until all environmental problems have been remediated. C. The City shall perform necessary requirements to provide the desired right of way required for the construction of the Project. The City will comply with and assume the costs for compliance with all the requirements of Title II and Title III of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, Title 42 U.S.C.A. Section 4601, et seq., including those provisions relating to incidental expenses 1/13/00 Page 4 of 18 incurred by the property owners. Documentation to support such compliance must be maintained and must be made available to the State and its representatives for review and inspection. D. In the event the right of way is donated to the City, the City will provide all documentation to the State regarding the value of the acquired property. The State will review the City's appraisal of the donated property to determine the fair market value. A portion of the fair market value of donated right of way will be credited towards the City's financial share by reducing the total cost of the Project for all participants. The State will not reimburse the City any funds in the event the right of way was purchased before FHWA approval and the fair market value of the donated property exceeds the City's financial share towards the Project. E. The City shall prepare right of way plat(s), property descriptions and other data as needed to properly describe the right of way which the City is to acquire and provide for the Project. The right of way plat(s) and property descriptions shall be submitted to the State for approval prior to the City acquiring the necessary right of way. Tracings of the plat shall be retained by the City for its permanent records. F. The City agrees to make a determination of property values for each right of way parcel by methods acceptable to the State and to submit to the State's District Office a tabulation of the values so determined, signed by the appropriate City representative. Such tabulations shall list the parcel numbers, ownership, acreage and recommended compensation. Compensation shall be shown in the component parts of land taken, itemization of improvements taken, damages (if any) and the amounts by which the total compensation will be reduced if the owner retains improvements. This tabulation shall · be accompanied by an explanation to support the determined values, together with a copy of information or reports used in arriving at all determined values. The State will 1/13/00 Page 5 of 18 review the data submitted and may base its reimbursement for parcel acquisitions on the values which are determined by this review. G. Condemnation proceedings, when applicable, will be initiated at a time selected by the City and will be the City's responsibility and at its own expense unless' otherwise provided herein. The City will concurrently file condemnation proceedings and a notice of lis pendens for each case in the name of the State, and in each case so filed the judgment of the court will decree title to the property condemned to the City. H. Court costs of Special Commissioners' hearings assessed against the City in condemnation proceedings and fees incident thereto will be paid by the City. I. Reimbursement will be made to the City for right of way purchased after the date of FHWA approval in an amount not to exceed eighty percent (80%) of the cost of the right of way purchased in accordance with the terms and provisions of this agreement. Reimbursement will be in the amount not to exceed eighty percent (80%) of the State's predetermined value of each parcel, or the net cost thereof, whichever is the lesser amount. In addition, reimbursement will be made to the City for necessary payments to appraisers, expenses incurred in order to assure good title to property acquired and costs associated with the relocation of displaced persons or personal property as well as incidental expenses incurred in conveying the needed right of way to the City. Reimbursement shall not exceed eighty percent (80%) of such documented costs. If condemnation is necessary and title is taken as set forth herein under the above section concerning "condemnation," the participation by the State shall be based on the final judgment, conditioned upon the State having been notified in writing prior to the filing of such suit and upon prompt notice being given as to all action taken therein. J. The City will provide the State with right of way certifications which indicate that all right of way parcels have been acquired prior to letting a construction contract for the 1/13/00 Page 6 of 18 Project or that the acquisition of right of way parcels will have no affect on the construction of the Project. K. If the required right of way encroaches upon existing utilities and proposed Project construction requires the adjustment, removal or relocation of such utility facilities, the City will establish the necessary utility work in accordance with 43 TAC, Sec. 21.31- 21.51 and notify the affected utility companies of the required work. The City shall be responsible for all costs associated with the adjustment, removal or relocationof utility facilities which are owned and operated by the City, and such adjustment, removal or relocation shall be in accordance with applicable State law, regulations, policies and procedures. L. Utility adjustment costs which would be eligible for cost participation by virtue of a property interest as described in 23 CFR 645.107 (A)(C) will be reimbursable to the City not to exceed eighty percent (80%) of actual cost. The City will be responsible for the adjustment, removal or relocation of any utilities which are not eligible for Federal reimbursement. The adjustment, removal or relocation of these utilities shall be accomplished per the City's usual policies and procedures regarding private utilities. The City will be responsible for the preparation of the environmental assessment; however, the environmental documents will be reviewed and processed by the State. M. The City will provide the State with utility certifications which indicate that all utilities have been adjusted prior to letting a construction contract for the.Project or that the adjustment of utility facilities will have no affect on construction of the Project. N. The City will be responsible for the assessment, mitigation and remediation of any environmental problems associated with the development and construction of the Project. Written certification from the appropriate regulatory agency(s) that any environmental problems discovered have been remedied will be required by the State. 1/13/00 Page 7 of 18 The State will not let the construction contract for the Project until all known environmental problems have been remediated. All costs associated with the remediation of any and all environmental problems shall not be eligible for Federal reimbursement under this agreement. O. The engineering and design plans shall be developed in accordance with the latest edition and revisions of the State's Highway Design Division Operations and Procedures Manual or the American Association of State Highway and Transportation Official's A Policy on Geometric Design of Highways and Streets, the Texas Department of Transportation's 1993 Standard Specifications for Construction of Highways, Streets and Bridges, Federal regulations for conformity with the Clean Air Act air quality requirements, the EPA-National Pollutant Discharge Elimination System requirements, the Texas Accessibility Standards of the Architectural Barriers Act and theTexas Manual on Uniform Traffic Control Devices. In addition, all engineering work shall be prepared using the English system of measurements. Documents prepared for the purpose of public involvement shall be in the English unit system. P. The City shall prepare or cause to be prepared afl railroad exhibits required for the Project. The railroad exhibits shall be prepared per Texas Department of Transportation format. Q. The City must comply with applicable State and Federal rules and procedures in selection of the consultant and the consultant selection procedure must have prior approval by the Texas Department of Transportation and the Federal Highway Administration. The State will monitor the City's consultant selection process for adherence to Federal rules and procedures. The consultant selected by the City shall be subject to the approval of the State. The City must submit a copy of thc consultant's contract to the State for approval prior to the consultant starting work. The City shall forward to the State a copy of the 1/13/00 Page 8 of 18 1/13/00 completed engineering and design plans for review. R. Upon completion of the Project, the City will assume responsibility for maintenance of the completed roadway facility. STATE RESPONSIBILITIES A. The State will perform periodic reviews of all engineering work being developed by the City's consultant. The State will review all engineering and design plans submitted by the City, process environmental documents, process any railroad agreements and oversee any necessary public involvement. The State will provide a pavement design for the Project per AASHTO pavement design criteria. B. The State shall advertise for construction bids, issue bid proposals, receive and tabulate the bids and award a contract for construction of the Project in accordance with existing procedures and applicable laws. Any field changes, supplemental agreements or additional work orders which may become necessary subsequent to the award of the construction contract shall be subject to the approval of the State. C. The State will supervise and inspect all work performed by the construction contractor and will provide such engineering, inspection, and testing services as may be required to ensure that the construction of the Project is accomplished in accordance with the approved PS&E. The City will be allowed to review the construction work provided the review does not interfere with the work being performed by the State's contractor. D. Upon completion of the Project, the State will issue to the City a "Notification of Completion", acknowledging that the Project has been completed. Upon the City's receipt of the "Notification of Completion", the roadway will be removed from the State Highway System and will revert under the jurisdiction of the City. The State will provide one set of reproducible "As Built" plans to the City upon completion of the Project. Page 9 of 18 1/13~00 FUNDING RESPONSIBILITIES A. The total estimated costs associated with the construction of the Project, including construction engineering and testing services, is $6,000,000. B. The State will be responsible to secure the Federal share of funding required for the construction of the Project. The Federal share for the total cost is eighty percent (80%) of the total estimated cost of the Project, which is $4,800,000. The City will be responsible for any non-Federal participation costs associated with the Project. C. The estimated engineering review cost to be incurred by the Texas Department of Transportation is $70,000. Upon execution of this agreement, the City will submit a check or warrant made payable to the "Texas Department of Transportation" in the amount of $14,000, which amount is based on twenty percent (20%) of the estimated engineering review cost. These funds will be utilized by the State to review the engineering documentation, and cover other incidental costs. D. The City shall make progress payments to the consultant and submit the completed engineering documents to the State for review and approval. The City shall retain and submit to the State all cost documentation associated with the development of the completed engineering documents. E. The State shall reimburse the City funds which have been incurred and are applicable to the Federal cost sharing arrangement established herein. The payments to the City for services rendered will be made monthly based upon the City's approved monthly progress report and itemized and certified statements (Texas Department of Transportation Form 132, or an invoice that is acceptable to the State) detailed to show the names of employees, time worked, actual work performed and actual rates. Monthly statements should include authorized non-salary expenses with supporting itemized invoices. The City shall comply with the cost principles established in OMB Page 10 of 18 Circular A-87, "Cost Principles for State and Local Governments." F. The itemized and certified statements shall show the total amount earned to the date of submission and the amount due and payable as of the date of the current statement. Final payment of any money due should be made to the City after satisfactory completion of all services and obligations covered in this contract, including acceptance of work by the State and completion of final audit. Final payment does not relieve the City of the responsibility of correcting any errors and/or omissions resulting from negligence. G. The original Form 132, or an invoice that is acceptable to the State, and four (4) copies should be submitted directly to the District Office to expedite processing. Upon receipt and approval of each statement, the Department shall pay the amount which is due and payable within thirty (30) days time. H, Sixty (60) days prior to the date set by the State for receipt of the construction bids, the State will notify the City to make available any funding required for the construction of the Project. The City shall remit a check or warrant payable to the "Texas Department of Transportation" in the amount specified by the State equal to the estimated construction costs, plus engineering and contingencies costs, plus the City's portion of the State's review costs and the State's indirect costs as determined per the State's Indirect Cost Recovery Plan, minus any funds previously submitted by the City, and minus the eighty percent (80%) Federal participation of t~4,800,000 for the total Project. Payment must be made within thirty (30) days of receipt of the State's written notification. I. Overruns of the estimated Project cost shall be subject to the approval of the State and shall be in accordance with the applicable guidelines set by the MPO. J. The State will perrorm an audit ol= all costs associated with the Project. In the event additional funding is required by the City at anytime during the Project, the City will 1/13/00 Page 11 of 18 provide the funds within thirty (30) days from receipt of the State's written notification. In the event any funds are due the City, the State will promptly make arrangements to provide the funds to the City. INDIRECT COST RECOVERY PLAN Chapter 2106, Texas Government Code, requires the State to recover indirect costs based on a percentage of the State's actual direct costs to complete the Project. The indirect costs will be in accordance with the State's Indirect Cost Recovery Plan and will be based on the City's funding percentage provided herein. The indirect cost recovery rate in effect for this Project is zero. OWNERSHIP OF DOCUMENTS Upon completion or termination of this agreement, all documents prepared by the City shall remain the property of the City and all documents prepared by the State shall remain the property of the State. All data prepared under this agreement shall be made available to the State without restriction or limitation on their further use. TERMINATION A. This agreement may be terminated by any of the following conditions: (1) By mutual written agreement and consent of both parties. (2) By either party, upon the failure of the other party to fulfill the obligation as set forth herein. B. The termination of this agreement shall extinguish all rights, duties, obligations and liabilities of the State and City under this agreement. If the potential termination of this agreement is due to the failure of the City to fulfill its contractual obligations as set forth herein, the State will notify the City that possible breach of contract has occurred. The City should make every effort to remedy the broach as outlined by the State within a period mutually agreed upon by both parties. 1/13/00 Page 12 of 18 t0. 11. 12. INDEMNIFICATION The City acknowledges that while not an agent, servant, or employee of the State, it is responsible for its own acts and deeds and for those of its agents or employees during the performance of the work authorized in this contract. AMENDMENTS Any changes in the time frame, character, agreement provisions or obligations of the parties hereto shall be enacted by written amendment executed by both the City and the State. LEGAL CONSTRUCTION In case one or more of the provisions contained in this agreement shall for any reason be held invalid, illegal or unenforceable in any respect, such invalidity, illegality or unenforceability shall not affect any other provisions hereof and this agreement shall be construed as if such invalid, illegal or unenforceable provision had never been contained herein, NOTICES All notices to either party by the other required under this agreement shall be delivered personally or sent by certified U.S. mail, postage prepaid, addressed to such party at the following respective addresses: State: or City: Texas Department of Transportation P.O. Box 1386 Houston, TX 77251-1386 7721 Washington Avenue Houston, TX 77007 Mr. Alan Mueller Projects Coordinator City of Pearland 3519 Liberty Drive Pearland, Texas 77581-5416 1/13/00 Page 13 of 18 13. 14. 15. All notices shall be deemed given on the date so delivered or so deposited in the mail, unless otherwise provided herein. Either party hereto may change the above address by sending written notice of such change to the other in the manner provided herein. SOLE AGREEMENT This agreement constitutes the sole and only agreement between the parties hereto and supersedes any prior understandings or written or oral agreements respecting the within subject matter. REMEDIES Violation or breach of contract terms by the City shall be grounds for termination of the agreement, and any increased cost arising from the City's default, breach of contract, or violation of terms shall be paid by the City. This agreement shall not be considered as specifying the exclusive remedy for any default, but all remedies existing at law and in equity may be availed of by either party and shall be cumulative. INSPECTION OF CITY'S BOOKS AND RECORDS The State will, for purpose of termination of the agreement prior to completion, examine the books and records of the City for the purpose of checking the amount of the work performed by the City at the time of contract termination. The City shall maintain all books, documents, papers, accounting records and other documentation relating to costs incurred under this agreement and other documentation relating to costs incurred under this agreement and shall make such materials available to the State, Federal Highway Administration (FHWA) or its duly authorized representatives for four (4) years from the date of final payment under this contract or until impending litigation is resolved. Additionally, the State, FHWA, and its duly authorized representatives shall have access to all records of the City which are directly applicable to this agreement for the purpose 1/13/00 Page 14 of 18 of making audits, examinations, excerpts, and transcriptions. 16. OMB A-128 AUDIT REQUIREMENTS The City shall comply with the requirements of the Single Audit Act of 1984,P.L. 98-502, ensuring that the single audit report includes the coverage stipulated in paregrephs 6, 8, and 9 of OMB Circular No. A-128. 17. PROCUREMENT STANDARDS The City shall adhere to the procurement standards set forth in Title 49 CFR Part 18.36. 18. PROPERTY MANAGEMENT STANDARDS The City shall adhere to the property management standards set forth in Title 49 CFR Part 18.32. 19. COMPLIANCE WITH LAWS The City shall comply with all Federal, State, and local laws, statutes, ordinances, rules and regulations, and the orders and decrees of any court, administration bodies, or tribunals in any matter affecting the performance of the agreement. 20. CIVIL RIGHTS COMPLIANCE The City shall comply with the regulations of the Department of Transportation as they relate to nondiscrimination (49 CFR 21 and 23 CFR 710.405 (B)); also Executive Order 11246 titled "Equal Employment Opportunity," as amended by Executive Order 11375 and as supplemented in the Department of Labor regulations (41 CFR 60). 21. MINORITY BUSINESS ENTERPRISE PROGRAM REQUIREMENTS The City shall comply with the "Minority Business Enterprise Program Requirements" established in 49 CFR Part 23, Subpart D. 1/13/00 Page 15 of 18 22. 23. DEBARMENT CERTIFICATIONS The City is prohibited from making any award at any tier to any party which is debarred or suspended or otherwise excluded from or ineligible for participation in Federal assistance programs under Executive Order 12549, Debarment and Suspension. The City shall require any party to a subcontract or purchase order awarded under this contract as specified in Title 49 of the Code of Federal Regulation, Part 29, (Debarment and Suspension) to certify its eligibility to receive Federal funds and, when requested by the State, to furnish a copy of the certification. SIGNATORY WARRANTY The signatories to this agreement warrant that each has the authority to enter into this agreement on behalf of the entity they represent. 1/13/00 Page 16 of 18 IN TESTIMONY HEREOF, the parties hereto haVe caused these presents to be executed in duplicate countei'parts. CITY OF PEARLAND ATTEST/SEAL: CITY OF PEARLAND Signed by: City Manager APPROVED AS TO FORM: Date of Execution Darrin Coker Interim City Attorney 1/13/00 Page 17 of 18 THE STATE OF TEXAS Executed for the Executive Director and approved for the Texas Transportation Commission under the authority of Minute Order No. 100002 and Administrative Circular 26-93 and superseded by Stand Alone Manual Notice 98-3, for the purpose and effect of activating and/or carrying out the orders, established policies or work programs heretofore approved by the Texas Transportation Commission. By: Jennifer D. Soldano Director Contract Services Office Date 1/13/00 Page 18 of 18 '. IFUTURE MONROE RD. HJ BW 8 rk etery MCHARD ROAD SH 35 MCHARD ROAD ~CTLY CONSTRUCTION FUTURE PEARLAND PARKWAY EXHIBIT A CSJ 0912-31-914 & 0912-71-904 MC;HARD ROAD FROM SH 35 TO BW IN PEARLAND TEA 21 Highways http://www.dot.state.tx.us/insdtdofforgchartJlao/federal/tea21/tea21.htm 498. 512. 546. 571. i597. 632. 694. 699. 753. ¢Viden State Highway 6 frOm FM521 to [| Brazoria County line and construct railroad ][ 9.1500 3verpass Construct the George H.W. Bush Presidential Corridor from Bryan to east to 1-45 7.5000 Construct FM2234 (McHard Road) from / SH-35 to Beltway 8 at Monroe Boulevard ~ 4.8000 Construct US 77/83 Expressway extension, !1 2.2500 Brownsville J theRec°nstruct bridges across the channel fOrport of Corpus Christi ll 4.0000!. Upgrade State Highway 35 Yoakum District in Matagorda and Brazoria Counties t 6.9100 Conduct feasibility study on upgrading SH 16 i~n _S o u t_h?_e_ _x_a_s .......................... il v. ,.~_~.._,, Construct State Highway 121 from 1-30 to i 25.0000 US-67 in Cleburne Construct circumferential freeway Iccp around l 7.4250 Texarkana Conduct MIS for Multimodal Downtown ii Improvement Project, San Antonio 0.7500 I[Improve 1-35 West from Spur 280 to 1-820 in 809. d[Fort Worth 3.0000__ IIConstruct Texas State HighwaY 49 between I 4.8000 !335. _ ........ _JlFM 1735 to Titus/Morris Co. line II Reconstruct State Highway 87 between 884. Sabine Pass and Bolivar Peninsula, 0.9705 [McFadden Beach Widen Highway 287 from Creek Bend Drive to 913. Waxahach e bypass 5.1250 Implement "Hike and Bike" trail program, II 6 0000 , [H.o__uston ............................................ j[ .............. v. ...... 915. il941. IIConstruct relief route around Alice I1 0.1875 Widen State Highway 35 from SH288 in I I Angleton to FM521 and dedicate $630,000 to I 5.175il °""' the acquisition of right-of-way in Brazoria ................... ICounty ~IL ............ IConstruct Galveston Island Causeway / 993: 0.547~ j Expans on project, Galveston t 1022. 1030. [1065. Construct Houston Street Viaduct project in Da as Relocate railroad tracks to eliminate road srossings, and provide for the rehabilitation of secondary roads providing access to various parts of the Port and the construction of new connecting roads to access new infrastructure safely and efficiently, Brownsville Construct 4-lane divided highway on Artcraft Road from 1-10 to Route 375 in El Paso 5.1250i 4.500C 5.0000 EXHIBIT C 12 of 16 6/20/99 10:48 AM