Loading...
R2009-036 - 2009-03-03RESOLUTION NO. R2009-36 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING A CONTRACT FOR CONSTRUCTION MATERIALS TESTING SERVICES ASSOCIATED WITH THE SH 288/BELTWAY 8 UTILITIES PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract for construction materials testing services associated with the SH 288/Beltway 8 Utilities Project, a copy of which is attached hereto as Exhibit "A"and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract for construction materials testing services associated with the SH 288/Beltway 8 Utilities Project. PASSED, APPROVED and ADOPTED this the 2nd day of ar h, A.D., 2009. s.~..~ TOM REID MAYOR ATTEST: `4o QtiAaCq;j; ,--; Y NG I R C ''~~ I Y S ETARY ' "` APPROVED AS TO FORM: ~~..-._ DARRIN M. COKER CITY ATTORNEY Exhibit "A" Resolution 2009-36 W67072 CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is entered into on ~ ~~ ~~q by and between the City of Pearland ("CITY") and Tolunay-Wong Engineers, Inc. ("CONSULTANT"). The CITY engages the CONSULTANT to perform Construction Materials Services for a project known and described as SH288 / BW 8 Utilities (Project #W67072). SECTION I -SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A. The CONSULTANT shall perform Construction Materials Observation and Testing Services. See Exhibit A, attached, for a detailed SCOPE OF WORK. The PROJECT schedule shall conform to the construction schedule. B. The CONSULTANT shall prepare and submit a detailed opinion of estimated cost of the PROJECT. C. The CONSULTANT acknowledges that the CITY (through its employee handbook) considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the CITY. The CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY employee to engage in such misconduct. D. The CONSULTANT recognizes that all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. E. The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each. occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non-owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in limits ("Change in Coverage") except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT, CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT'S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. F. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the CONSULTANT, his officers, employees, agents, or subcontractors under this CONTRACT. G. All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. SECTION II -PERIOD OF SERVICE This CONTRACT will be binding upon execution and end upon completion of the construction related work not to exceed 24 months. 2 SECTION III -CONSULTANT'S COMPENSATION A. The method of payment for this CONTRACT is not to exceed. Total compensation for the services performed shall not exceed $65,430. B. The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT. C. The CITY shall make payments to the CONSULTANT within thirty (30) days after receipt and approval of a detailed invoice. Invoices shall be submitted on a monthly basis. SECTION IV -THE CITY'S RESPONSIBILITIES A. The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B. The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize delay in the progress of the CONSULTANT'S work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of the work. The CONSULTANT agrees that the CITY'S inspection, review, acceptance or approval of CONSULTANT'S work shall not relieve CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or its sub-consultant(s) or in any way affect the CONSULTANT'S status as an independent contractor of the CITY. SECTION V -TERMINATION A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason - - with or without cause -- by delivering written notice to CONSULTANT personally or by certified mail at 10710 S. Sam Houston Pkwy W., Suite 100, Houston, TX 77031. Immediately after receiving such written notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials supplied by the CITY on or before the 15th day following termination of the CONTRACT. C. In the event of such termination, the CONSULTANT shall be paid for services performed prior to receipt of the written notice of termination. The CITY shall make final payment within sixty (60) days after the CONSULTANT has delivered to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D. If the remuneration scheduled under this contract is based upon a fixed fee or definitely ascertainable sum, the portion of such sum payable shall be proportionate to the percentage of services completed by the CONSULTANT based upon the scope of work. E. In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. F. If the CITY terminates this CONTRACT for cause and/or if the CONTRACTOR breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney's fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under this CONTRACT. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. SECTION VI -ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. SECTION VII -COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability, and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent fee that has been paid. 4 SECTION VIII- SUCCESSORS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. The parties have executed this CONTRACT this 2nd day of March , 2009. Bill Eisen, City Manager 3/2/09 Tolunay-Wong Engineers, Inc. Tolunay - Wong Engineers , Inc . January 12, 2009 TWEI Proposal No: P09-0O22 City of Pearland 3519 Liberty Drive Pearland,TX 77546 Email: TBattenfield@ci.pearlend.tx.us • Attn: Ms. Teresa Battenfield, P.E. • PROPOSAL FOR CONSTRUCTION MATERIAL TESTING SERVICES SH 288/BW 8 UTILITIES CITY OF PEARLAND,TEXAS Dear Ms. Battenfield: Tolunay-Wong Engineers, Inc. (TWEI) appreciates the opportunity to submit this proposal to provide construction material testing services for the mentioned project. This proposal outlines a scope of services, unit rates and an estimated cost of services. Scope of Services The scope of services covered in this proposal includes, but are not limited to the following: . o Field density/moisture testing,backfill o Cement stabilized sand density and compressive strength,backfill • o Concrete monitoring and testing; lift station, paving, driveways • e Related laboratory testing and sample pick-up services All services and procedures requested will be performed in accordance with the City of Pearland schedule of fees dated 3/29/2006 and will be followed as outlined in the general notes section of the said document. Estimated Cost of Services We estimate the cost of services to be $65,430 for the project. See attached estimated cost of services for a break down of the cost. Actual billings may vary as construction progresses. We will not exceed the estimated total without_prior written approval. Overtime charges will be effect for all hours work in excess of 8 per day and all hours worked on weekends and holidays. Overtime will be charged at a rate of 1.5 times the proposed hourly rate listed in the City of Pearland Schedule of Fees. All services performed that require retesting due to failures will be the responsibility of the contractor and the contractor will bear that expense. 10710 S.Sam Houston Pkwy W.,Suite 100,Houston,TX 77031 (713)722-7064 Fax(713)722-0319 TWEI Proposal No.: P09-0O22 February 6,2009 Page 2 Proposal Acceptance If this proposal meets with your approval, please send us your standard contract agreement. We can begin work with your verbal authorization. Closing Remarks Again, we would like to express our appreciation for the opportunity to submit this proposal and look forward to serving you on this project. Sincerely, TOLUNAY-WONG ENGINEERS, INC. Doug Weslow Vice President Enclosures: Estimated Cost of Services City of Pearland Schedule of Fees (Dated 3/29/2006) Ti lunay=V ong Engineers, Deco ESTIMATED COST OF SERVICES CONSTRUCTION MATERIALS TESTING PROPOSAL SH 288/ BW 8 UTILITIES CITY OF PEARLAND, TEXAS Date: February 6,2009 Proposal No: P09-0O22 Fee Code Field Services Quantity Unit Fee Unit Total 8 Technician, NICETII 1040 $ 53.00 hour $ 55,120.00 (Earthwork Testing and Sample Pick-Up) 9 Technician,ACI-I 80 $ 46.00 hour $ 3,680.00 (Concrete Testing and Simple Pick-Up) subtotal $ 58,800.00 Laboratory Services 1001 Atterberg Limits 10 $ 45.00 each $ 450.00 (Soil Classification) 1006 Moisture/Density Relations 10 $ 150.00 each $ 1,500.00 (Proctor) 1014 Cement Stabilized Sand Cylinders 80 $ 52.00 each $ 4,160.00 203 Concrete Compressive Strength Cylinders 40 $ 13.00 each $ 520.00 subtotal $ 6,630.00 Total Estimate $ 65,430.00 • note: -This is an estimate,and actual billings may vary with construction progress. Page 1 of 1 CITY OF PEARLAND SCHEDULE OF FEES CONSTRUCTION MATERIALS ENGINEERING TESTING AND INSPECTION SERVICES CONTRACT Hourly fee PERSONNEL Regular Time Overtime 1 Principal" $ 143.00 $ 143.00 2 Sr.Engineer,PE(10 years Exp.) ___ _ _ $ 105.00 $ 105.00 3 Project Engineer,PE $ 82.00 $ 82.00 4 Staff Engineer,EIT _ $ 65.00 $ 65.00 5 Graduate Engineer,CMT Manager $ 58.00 $ 58.00 6 Technician NICET IV $ 63.00 $ 79.50 7 Technician NICET III,HMA II $ 58.00 $ 72.00 8 Technician NICET II, HMA IA $ 53.00 $ 64.50 9 Technician ACI I,II $ 46.00 $ 10 Technician HMA IB $ 48.00 $ 57.00 ------------ 11 _Technician,Non-certified $ 42.00 48.00 12 Welding Inspector(CWI) __ $ 77.00 $ 1.00.50 13 Welding Inspector(Associate CWI) $ 58.00 $ 72.00 14 NOT Infector(ASNT Level II) $ 58.00 $ 72.00 15 NDT Inspector(ASNT Level III)__ _ $ 62.00 $ 78.00 16 NDT Inspector(ASNT Level II)with assistant $ 96.00 $ 129.00 17 Support Personnel* _ $ 31.00 $ 46.50 18 Traffic control Cost+10% Services of these personnel must be authorized by the Projects Director in advance MATERIAL TESTING 100 Concrete Aggregates Unit Price 101 Screen or Sieve AnallysiskASTM C-136) $ 39.00 102 Specific Gravity(ASTM C-127 or C-128) $ 39.00 103 Unit Weight(ASTM C-29) $ 28.00 104 Absorption(ASTM C-127 or C-128) $ 33.00 105 Finer than 200 Mesh(ASTM C-117) $ 36.00 106 Organic Impurities(ASTM C-40L _ _ $ 35.00 107 Scratch Hardness(ASTM C-851) $ 31.00 108 L A Abrasion(ASTM C-131 or C-535) $ 153.00 109 Cla_Lumps(ASTM C-142) $ 40.00 110 Light Weight Pieces(ASTM C-123) $ 47.00 111 Sand Equivalent(ASSTM C-2419) _ _$ - 48.00 112 Sodium/Magnesium Sulfate Soundness(5 cycles) $ 260.00 113 Na/Mg Sulfate Soundness additional cycles $ 150.00 114 Petrographic Exam of concrete Aggregates(ASTM C-295) by quotation • City of Pearland, Schedule of fees Page 1 of 7 jlp 3/29/2006 200 Concrete Mix Design Inspection and Testing Unit Price Unit 201 Mix Design review(AC1-214): Using predetermined aggregate properties and other design factors;excluding test costs $ 115.00 each 202 Trial Batch Tests(ASTM C-192): Using aggregate admixtures and cemen proposed for use;each batch or curve point $ 200.00 each _ _• 203 Cylinder Test(ASTM C-39)or Hold ___•____-- $ 13.00 each 204 Beam Test(ASTM C-78,C-293)or Hold $ 20.0D each 205 Concrete Coring(4"dia.To 6"thickness)ASTM C-42 includes _p_qrsonnel,vehicle,and patching holes _--_ _• $ 72.00 each 206 Measuring Thickness of Concrete Cores(ASTM C-174) _--___ _. $- 6.75_ - __ _9.50-each _ $ 207 Additional Thickness(6"to 12") inch 208 Additional Thickness(over 12") $ 12.00 inch 209 Concrete Coring,Minimum charge(min.3 cores) _ $ 275.00 LS 210 Preparation of Cores,Cap_ping.&Test(ASTM C-42,C-39) $ ._ _ 57.00 eac,11. _ 211 Cement Compressive Strength, one age(ASTM C-109) - $ -,. 104.00 set _ 212 Cement Compressive Strength,two ages(ASTM C-109) $_ . 127.00 set 213 Mortar/Grout Compressive Strength Cubes(ASTM C-109) __$ 17.00 each 214 Mortar/Grout Com�essive Strength 3"x 6"(ASTM C-495) $ 17.00 each _ 215 Mortar/Grout Compressive Strength(ASTM C-1019) $ 17.00 each 216 Structural Coring--_ __ by quotation 217 Windsor Probes(ASTM C-803)_ _ ✓ $ 68.00 set 218 Bar Linear Shrinkage _ $ 235.00 set 219 Unit Weight of Lightweight Cylinders $ 25.00 set 220 Split Tensile Strength including preparation(ASTM C-496) $ 80.00 each_ 221 Petrographic Exam of Hardened Concrete(ASTM C-856) by quotation 222 Concrete Shrinkage Test(ASTM C-157, C-490) $ 125,00 test 300 Brick Unit Price All brick tests will be performed in accordance with ASTM C-67(minimum 5 bricks) 301 Compressive Strength(ASTM C-67) $ 24.00 302 Absorption-five hours boiling(ASTM C-67), —_ $ 52.00 303 Absorption-24 hours boiling(ASTM C-67) $ 53.00 400 Reinforcing Steel: ASTM A-370&ASTM A-675 Unit Price 401 Tension Test(size 11 and under) $ 36.00 402 Tension Test(over size 11) $ 48.00 403 Bend Test(size 6 and under) _ $ 29.00 404 Bend Test(over size 6) __— $ 35.00 405 Deformation Examination $ 21.00 406 Bolt Tensile Test(ASTM A-325) _ . ._. ___—____- ._•_. _.. _ .-$.__ •42.00 500 Welded Specimens •Unit Price 50i Weiding Coupons(.ASTM A-370)_ Cost+10% 600 Tension Tests(ASTM A-370) Unit Price 601 Without use of Extensometer $ 38.00 602 Without use of Extensometer(with curves) $ 67.00 603 Steel Strand Cable _• __. —.__ $ 94.00 City of Pearland,Schedule of fees Page 2 of 7 jlp 3/29/2006 700 Nondestructive Testing(Steel) Unit Price 701 Radiographic Films(ASTM E-142) Cost+10% 702 Radiographic Source, Iridium(E-1114) $ 91.00 703 Radiographic Source,Cobalt 60 _ _ _ $ 104.00 704 Ultrasonic Equipment(AWS D11) _$ 67.00 800 Asphalt Concrete Mix Design&Inspection Unit Price Unit 601 Mix Design Review(using predetermined aggregate properties and other design factors),excluding test costs $ 160.00 each 802 Trial Batch Test(up to 5 curve points) _-_ $ 1,200.00 each_ 803 Additional Curve points for item 802,per point _ _ $ 173.00 each_ Extraction&Gradation Test(ASTM D-2172,ASTM C-136,or 804 TEX-210F) $ 149.00 each 805 Specific Gravity(ASTM D-2041,TEX 201 F) $ _53.00 each Stability: Hveem,3 per set(ASTM D-1560 or TEX 208F) $ 70.00 set 806 Stability: Marshall,3 per set(ASTM D-1559) $ 70.00 set 807 Bulk Density of Lab molded or Field specimen(core),3 per set (TEX 207F) $ 39.00 set 808 Molding Specimens,3 per set,for items 806&807(ASTM D- 1560,TEX 208F) _ $ 46.00 set 809 Penetration(ASTM D-5) $ 63.00 each 810 Ductility(ASTM D-113) $ 85.00 each 811 Viscosity ASTM D-21701 $ 70.00 each 812 Asphalt coring(4"dia up to 6"thickness),includes personnel, vehicle and patching holes $ 68.00 each 813 Asphalt Coring minimum charge $ 250.00 LS_ 814 Additional thickness over 6" __ _ $ 6.00 inch 815 Abson Recovery(TEX 211 F) $ 240.00 each 816 Measuring Thickness of Asphalt Cores $ 7.00 each - 817 Maximum Theoretical Specific Gravity(TEX 227F) _ $ 67.00 each - 818 Hot Mix In-Place Asphalt Design _ $ 1,600.00 each 819 Apparent Specific Gravity(TEX 202F) __ _ _ $ 50.00 each -_ 820 Moisture Susceptibility Test(TEX 531 C) $ 350.00 each 821 PMA Extraction/Gradation(ASTM D-2172) $ 200.00 each 822 PMA Extraction/Gradation by Ignition(ASTM D-6307) $ 124.00 each 900 Build-up Roof and Roof Fill Unit Price Unit 901 Cut Out Roofing Sample Evaluation/Analysis(ASTM D-2928) $ 259.00 each 902 Dry Density Test and 28-day Compressive Strength Tests (ASTM C-495) $ 58.00 each 903 Laboratory Preparation of Sample for Testing _ Applicable Tech Rate 1000 Soils Tests Unit Price Unit 1001 Liquid and Plastic Limits(Atterberg Limits)(ASTM D-4318) $ 45.00 each 1002 Moisture Content Only(ASTM D-2216) $ 6.00 each 1003 Mechanical Sieve Analysis,through#200 sieve(ASTM D-422) $ 42.00 each - 1004 Percent Passing#200 sieve(ASTM D-1120) $ 35.00 each 1005 Specific Gravity(ASTM D-854,D-204) $ 44.00 each 1006 OMD Standard Compaction(ASTM D_698) $ 150.00 each 1007 OMD Modified Compaction(ASTM D-1557) $ 160.00 each - City of Peariand,Schedule of fees Page 3 of 7 jlp 3/29/2006 1008 OMD Lime or Cement Stabilized Soil (ASTM D-698, D-558,D- 1557) --- ----- --- $ 165.00 each .- 1009 California Bearing Ratio(ASTM D-1883) __- $ 158.00 each__ _ _ 1010 Percent Solids in Lime Slurry(ASTM D-2216) _J $ 32.00 test _ Fo 1011 ur-point Lime content Recommendation Series(PI) $ 178.00 test _ 1012 1012 Cement Content of Freshly-mixed CSS Mixture(ASTM D-806) $ 230.00 each__ _ 1013 Nuclear Density Equipment Rental(Max.8 hrs/day) N/A _ 1014 Compressive Strength of CSS Sample, Including Molding (ASTM D-1632,D-1633_ _- $ 52.00 each __ 1015 Maximum&Minimum Density,sands(ASTM D-4254) $ 156.00 test . _- 1016 Density and Moisture of Soil Sample $ 19.00 each • ___ 1017 Unconfined Compression(ASTM D-2166) $ 33.00 each _. 1018 Unconsolidated Undrained(ASTM D_2850) $ 46.00 each 1019 Consolidation,One cycle(ASTM D-2435) $ 265.00 each 1020 Consolidation-Additional increments_ $ 38.00 each 1021 pH of soil(ASTM D-4972) r $ 13.00 each 1022 Optimum Lime content pH Method $ 173.00 each 1023 Sieve analysis-Base materials(ASTM C-136) $ 70.00 each 1024 Compressive Strength of Cement Stabilized Base Materials (TEX 120E,ASTM D-2166) $ 190.00 each 1025 Soil Shrinkage Factor(ASTM D-427) - $ 46.00 each 1026 One-dimensional Swell Cohesive Soils $ 215.00 each 1027 Triaxial Testing By Quotation 1028 Permeability Test,Constant Head Method(ASTM D-2434) $ 170.00 test 1029 Pinhole Test $ 210.00 test 1030 Crumb Test(ASTM D-4647) $ 28.00 each 1031 Double Hydrometer(ASTM D-4221) $ _ 130.00 each 1032 Free Swell(FHA) _ $ 75.00 each 1033 Soil Suction-Filter Pa_r Method $ 42.0D each 1100 Subsurface Field Investigation Unit Price Unit 1101 Intermittent 3-inch diameter(0-50 ft) $ 13.50 ft 1102 Intermittent 3-inch diameter(51 -100 ft) $ 15.00 ft 1103 Continuous 3-inch diameter(0-20 ft) $ 15.00 ft 1104 Boring over 100 ft additional surcharge _ _ _- $ 5.0D ft 1105 Wash boring $ 7.00 ft 1106 Auger boring $ 8.00 ft 1107 Undisturbed or Split Spoon Sample in Wash or Auger Borings $ 29.00 each 1108 Grouting of completed bore holes $ 4.00 ft 1109 Boring not accessible by truck-mounted equipment,surcharge $ 5.00 ft 1110 Minimum charge $ 575.00 LS 1111 Mobilization/Demobilization_ _-_ $ 250.00 project 1112 Plezometer Installation By Quotation 1113 THD cone Penetration Test $ 20.00 each _-__ 1114 ATV Mobilization Surcharge $ 100.00 LS 1115 Portable Rig Drilling(two-man crew) $ 132.00 hr 1116 Stand bt@wo_man crew) $ 125.00 hr 1117 Materials ___ __-_-_ __-_____•_•_-,•___--_-_. Cost+ 10% City of Pearland,Schedule of fees Page 4 of 7 jlp 3/29/2006 • 1200 Sliplining and Manhole Rehabilitation Unit Price Unit 1201 Micro Silica Content(Petrographic Analysis) By Quotation 1202 Coring/Drilling of Manhole.Grout — $ 45.00 hole 1203 Coring of Gunite Panels(incl.Compressive strength) $ 90.00 core 1204 Thickness of Liner Materials ASTM D-2122 Applicable Tech Rate 1205 Flexural Strength/Modulus of Elasticity of Liner Material $ 120.00 coupon 1206 Holiday Testing equipment rental $ 70.00 trip 1207 Compressive Strength 3x6 cyls(Elastizel)(ASTM D-790) $ 200.00 set 1300 Reimbursable Expenses Unit Price Unit Reimbursable Expenses,including outside testing,equipment 1300 and supplies Cost+ 10% GENERAL NOTES Technicians Reimbursement for personnel performing sampling,testing and inspection services shall be as as stated above and shall include reasonable travel time between Consultant's facility and the subject City of Pearland project. The billing rates are inclusive of all tools,equipment and consumable supplies and all else needed to perform the subject services,except as specifically noted in this Attachment. Consultant shall document hours of service for each visit to the City of Pearland project,including sample pick-up. The document shall contain the following: 1. Project Number and Name 2. Personnel name and classification typed or printed legibly 3. Time of departure from Consultant's facility 4. Time of arrival at City of Pearland project 5. Standby time,if any 6. Work requested and performed 7. Time of departure from City of Pearland project 8. Time of arrival at Consultant's facility 9. Overtime hours,if any 10.Signature of reviewing supervisor Testing&Reporting Field services shall be at the request of the City's Project Manager or his designee. Standard safety equipment will be required at all times on City projects. Results of tests that indicate a failure to meet specifications shall be transmitted immediately(telephone,fax,etc.)to the City. Construction materials engineering,testing and inspection reports shall be reviewed and signed by a licensed professional engineer. The engineer does not need to sign sample pick-up or project cancellation reports. All test results and inspection reports must be received by the city within 10 calendar days of the original test date. Report preparation,other than test reports,shall be billed as actual hours worked by the applicable laboratory personnel. Reproduction,except for six(6)copies of each test report,shall be reimbursed at cost. Personnel Rates All services on an hourly basis will be charged at the applicable rate,from the time the technician or inspector leaves the laboratory until he or she retums from the assignment. Hourly personnel overtime rates will be charged for the hours worked over 40 hours from Sunday through Saturday. City of Pearland,Schedule of fees Page 5 of 7 jlp 3/29/2006 Hourly services shall be invoiced to the nearest 1/4 hour. Testing services requested by the city for which no rate is listed shall be negotiated and authorized in writing prior to implementation. Documentation for such testing, unless specifically called for in the Scope of Services of individual Work Authorizations,shall include a daily activity sheet signed by the City representative requesting the designated test. Subcontractor/Subconsultant Rates Upon approval by the City Project Manager,required tests which are beyond the capability and/or capacity of the Consultant may be subcontracted to a qualified laboratory. Reimbursement for such subcontracted testing shall be at cot and shall be supported by an itemized invoice from the subconsultant/subcontractor. First-tier subconsultants/subcontractors shall be bound by the fee schedule and the rates as stated therein. Personnel Certifications Only certified engineering technicians are allowed for concrete or asphalt testing(ACI-1 or HMA I or II). Non-certified technicians are allowed for other testing projects,with the approval of the City of Pearland Project Manager. Certified technicians shall be provided when specifically requested by the city and should carry their certification cards with them while on the project site. Field Testing&Inspection A minimum two(2)hours personnel time will be allowed for each site visit for observations or testing except for sample pick-ups. If a technician/inspector is assigned to more than one City of Pearland project in one day,his or her actual time on the projects will be charged,provided the total time exceeds two hours. A minimum of a 30 minute lunch must be taken for work days of eight(8)hours or more. Sample pick-ups will be performed as a part of a scheduled field trip,whenever possible. If a separate trip for the sample pick-up is required,only the actual personnel time will be paid. A non- certified technician rate will be paid for concrete sample pick-ups,with the exception of a full-time technician assigned to the project. The city,wherever possible,will notify the laboratory at least 24 hours in advance that field testing service are required. If a technician has departed for the site prior to receipt of a cancellation notice, a maximum of two(2)hours will be paid for scheduled site activities. Testing and sampling procedures conducted in the field,including the use of nuclear moisture/ density machines,shall not be paid separately but shall be considered as part of the applicable rate for field technician time. Surcharges,as noted in the fee schedule,will be added where applicable. Invoices&Documentation Invoices covering all current Work Authorizations and conforming to the requirements of Contract Article 7,"Invoicing and Payment",shall be submitted monthly for each Work Authorization. One full set of supporting documentation,acceptable to the City,shall accompany the invoice. Acceptable documentation shall include,but not be limited to,fully completed and signed:(1)daily project specific activity reports(DPAR),signed and accepted by the appropriate City representative, for all personnel time being billed;and(2)summary/affidavits for all laboratory tests being billed. All hours invoiced must be supported by copies of test reports and an original signed time sheet or daily activity report sheets,signed by the project inspector,which contains the name and classification of the personnel. Invoices should be separated by individual project,with a weekly summary to explain any overtime paid. All claims for minimum call-out and premium time must have the DPAR showing that time signed by the appropriate City representative. City of Pearland,Schedule of fees Page 6 of 7 A)3/29/2006 Invoices without the proper documentation will be returned. Firms whose billings are more than 60 days in arrears will not be issued additional Work Authorizations until the billings are current. Reimbursable Expenses All reimbursable expenses shall have the prior approval of and be supported by documentation acceptable to the Project Manager. Non-reimbursable overhead expenses include telephone and fax charges(except long distance);local travel and vehicle expenses;preparation time for field trips;test report preparation,typing and reproduction;invoice preparation, reproduction and delivery; field and laboratory supervision;project proposal and set-up;equipment charges,except for those specifically authorized in writing by the City Project Manager;and any other costs or expenses not specifically included and/or addressed in this Fee Schedule. Rate Period All rates contained in this Fee Schedule shall remain firm for Work Authorizations issued within the term of the Contract,even if a Work Authorization issued during the term of the Contract extends past the original term of the Contract. The fees stated for laboratory tests are all-inclusive. No other charges shall be levied for personnel services and/or materials related to such testing,except as specifically noted In this Attachment. City of Pearland,Schedule of fees Page 7 of 7 jlp 3/29/2006