Loading...
R2008-160 2008-12-08 WW0802RESOLUTION NO. R2008-160 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE KNAPP ROAD/BOBBY STREET SANITARY SEWER REHABILITATION PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with the Knapp Road/Bobby Street Sanitary Sewer Rehabilitation Project, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to PM Construction and Rehab, in the amount of $224,530.00. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the Knapp Road/Bobby Street Sanitary Sewer Rehabilitation Project. PASSED, APPROVED and ADOPTED this the 8th day of December, A.D., 2008. ~OYY'[~ TOM REID MAYOR ATTEST: .. ~Q~i~szL;q;~a._,. ~ -~ ~-: ~:~ ~.z YO G G R ',?, ~_ CI SE ETARY ~ ~`~'~ -= APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY BID NO.:1009-04 SANITARY SEWER REHABILITATION PROJECT ALONG KNAPP ROAD AND BOBBY STREET CITY OF PEARLAND • LOW BIDDER ITEM SECTION ITEM DESCRIPTION UNIT OF ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. NO. MEASURE QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PM CONSTRUCTION AND HORSESHOE CONSTRUCTION, COFER PIPE CONSTRUCTION, REHAB,L.P. INC LLC NORTH HOUSTON POLE LINE LP AVERAGE OF ALL BIDDERS GENERAL ITEMS • 1 1505 Mobilization LS ' 1 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $2,500.00 $2,500.00 $20,000.00 $20,000.00 $7,375.00 $7,375.00 2 1555 Traffic Control&Regulation LS 1 $2,000.00 $2,000.00 $500.00 .$500.00 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $1,750.00 $1,750.00 3 1570 Trench Safety System LF 100 $1.00 $100.00- $1.00 $100.00 $25.00 $2,500.00 $1.00 $100.00 $7.00 $700.00 • 4 1564 Ground water control for open-cut construction LF 50 $1.00 $50.00 $10.00 $500.00 $0.01 $0.50 $20.00_ $1,000.00 $7.75 $387.63 TOTAL GENERAL ITEMS: $4,150.00 $6,100.00 $7,500.50 $23,100.00 $10,212.63 . WASTEWATER ITEMS Cut,Plug and Abandon 6-inch sanitary sewer force main(Complete- 6 2220 in-place) LF 1,010 $2.00 $2,020.00 $1,00 $1,010.00. $3.00 , $3,030.00 , $3.00 $3,030.00 $2.25 $2,272.50 6 Drawings Reconnection of existing 6-inch Sanitary Sewer Forcemain EA 1 $1,600.00 $1,600.00 . $1,500.00 $1,500.00 $1,220.00 $1,220.00 $1,000.00 $1,000.00 $1,330.00 $1,330.00 7 2542 Sanitary sewer manhole(Complete-in-place) EA 1 $2,800.00 $2,800.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $2,500.00 $2,500.00 $2,700.00 $2,700.00 8 2531 Sanitary sewer service stubs or service reconnections with stack EA 19 $580.00 $11,020.00 $100.00 $1,900.00 $750.00 $14,250.00 $550.00 $10,450.00 $495.00 $9,405.00 (Complete-in-place) Sanitary sewer service stubs or service reconnections without stack 9 2531 EA 19 $450.00 $8,550.00 $100.00 $1,900.00 $750.00 $14,250.00 $550.00 $10,450,00 $462.50 $8,787.50 (Complete-in-place) .. .. .. .. .. 10 2531 Extra depth sanitary sewer service stack VF 10 $10.00 $100.00 $50.00 $500.00 $100.00 $1,000.00 $20.00 $200.00 $45.00 $450.00 11 2531 Sanitary sewer service lead,near side LF 16 $20.00 $320.00 $350.00 $5,600.00 $35.00 $560.00 $20.00 $320.00 $106.25 $1,700.00 12 2531 Sanitary sewer service lead,far side LF. 22 $30.00 $660.00 $900.00 $19,800.00 $45.00 $990.00 $35.00 $770.00 $252.50 $5,555.00 13 02530 6-Inch to 12-inch diameter pipe burst •LF 330 $52.00 $17,160.00 $70.00 $23,100.00 $60.00- $19,800.00 - $64.00 $21,120.00 $61.50 $20,295.00 02571 14 02530 8-inch to 12-inch diameter pipe burst LF 1,430 $52.00 $74,360.00 $55.00 $78,650.00 $60.00 $85,800.00 $64.00 $91,520.00 $57.75 $82,582.50 02571 15 - 02530 10-inch to 12-inch diameter pipe burst LF 1,350 $56.00 $75,600.00 $61.00 $82,350.00 $60.00 $81,000.00 $64.00 $86,400.00 $60.25 $81,337.50 02571 16 2529 Cementious Using rehibilitation of sanitary sewer manhole EA 7 $770.00 $5,390.00 $700.00 $4,900.00 $1,000.00 $7,000.00 $700.00 $4,900.00 $792.50 $5,547.50 TOTAL WASTEWATER ITEMS: $199,580.00 $223,210.00 $232,400.00 $232;660100 $221,962.50 SUBTOTAL: , $203,730.00 . . . $229,310.00 $239,900.50 $255,760.00 $441,652.50 EXTRA ITEMS 02316 17 02317 Extra Hand Excavation CY 100 $50.00 $5,000.00 $5.00 $500.00 $1.00 $100.00 $10.00 $1,000.00 $16.50 $1,650.00 02318 - 02316 18 02317 Extra Machine Excavation CY . 50 $50.00 $2,500.00 '$5.00 $250.00 $1.00 . $50.00 $5.00 . $250.00 .$15.25 $762.50 19 2318 Extra Placement of Backfill material CY : 100 $24.00 $2,400.00 $5.00 $500.00: $1.00 - $100.00 : $5.00 $500.00 $8.75 $875.00 20 2252 Extra Cement-stabilized Sand CY 100.0 $34.00 $3,400.00 $50.00 $5,000.00 $1.00 $100.00 $18.00 $1,800.00 $25.75 $2,575.00 21 2751 Extra Structural Concrete with or without forms CY 100 $75.00 $7,500.00 $5.00 $500.00 $1.00 $100.00 $100.00 $10,000.00 $45.25 $4,525.00 TOTAL EXTRA ITEMS: $20,800.00 $6,750.00 $450.00 $13,550.00 $10,387.50 • • TOTAL BID: . $224,530.00 $236,060.00_ $240,350 0 '$269,310.00 $242,562.63 Bid Date:November 20,2008 Page 1 OF 1 r„ City of Pearland, Texas SANITARY SEWER REHABILITATION PROJECT ALONG KNAPP ROAD AND BOBBY STREET OCTOBER, 2008 N r�^ ,r N r pt Drawing List fg! j��:" �$ „,F,.,. f ,��� E ` COVER SHEET O�ate' - ? I EXISTING SITE PLAN 9 iLn,NadmP'i�yQ" S "" 4, 3 PROPOSES OSED SITE PLAN ,._...._..G_-• ----- 6@0,igiq I4i s v D RD DETAIL SHEET2 ���•��� ` 777YYY EWER STAN (J �� 6 SANITARY SEWER STAN 6 SANRARY SEWER STANDARD DETAIL SHEET3 PEARLAND - ( r r } 'I TEXAS 1 � I 1 i' , .r `ra ls / wy�� ae g —""'ins - o f Kmw MAYOR 6aiCr PaA , l° �d *wn.4 � ., - Tom Reid P,, ,,ck„m.. 1-_"e.»,,r'r } 4,,,,-,-,_,,-,,,„, ,,TMp"°°4t COUNCIL k tip � s j PROJECT •i Position 1 Woody Owens ` 1 c LOCATION rs? Position 2,Mayor Pro Tern Helen Beckman �s Position 3 Steve Saboe r Position 4 Felicia Kyle i I Positior 5 Kevin Cole I =. s5L.... _.. �y, u -1,0::_,,.a+Amror{u,�unr mPt, '.j CITY MANAGER NI' City of Pearland Location Map Bill Eisen ScalF:N.T.S. ASST.CITY MANAGER ASST.CITY MANAGER Mike Hodge,P.E. Nick Finan Director of Public Works Danny Cameron SUBMITTED BY: DATE (Design Engineer) .. .. .. .. . )Design FIrm) City Engineer Narciso Lira III,P.E. APPROVED BY: DATE Nardso Lire Ell.P.E. CRY E Jreer • • m m _- ._.......-_. \ EN.15'SAN SWN EX 15'SAN SWR �_-• m I ) . 1 W D ROBINSON _ Ex.15 SAN swR EX 15.sµ s tf 0' 100• 200• 400' WR • et s •.,• ' '+rose SCALE: 1"= 200' --- -- ip . _ 14 -'-- . - i SAN y --- EX 15 SAN SWR gg 3 3 FA W o EN.6'SAN SWR .� D W _ e.J _ _ .—._ ._._-__.__ _ 7RELAWNEY ._ __. - __ _. _ _-_ -. __ 20 EX 6'SAN SWR O— -_—, u A B I 1 , - _--- REHAB EL51 SAN--- •O sea 62lR1OLE 1 Li _ ' u u1. VEX 6'SAN 5WP RR.6E6[RIP11R1 DATE 6YN Om nrI J RECONNECT EC e•FORCE ' b 62a TO PROPOSED aTANO PLUG Ex.e• - -- --- a AND Pwo E[ SuOTARY SENER YIJMOLE''"� r B•fORCE YARN D ' (d51DE DROP PER OTT Oi�1 ipILS YYN —_ _ _ __. PEAR{ANO DETAIL) I11V , R�',�REHAB N • II IA---_ 1 1. i. ABANDON EX.B•FORCE6MN IN PLACE KNAPP RD PROP.430 LF-B•TO 12• ff sox 5tl1A PoE BURST -- O 82DIE'2•_SAH_SwR__ PROP.150.1f_- _— PROP.2➢0 Li.- 4_PROP,250_LP_- PROP.70O li'- _ _ �� III14r 5MR PIPE BURST SIG PIPE BURST L SRR PIPE BURST 5'M PIPE BURST PROP.SAN 5M6', REHAB MST SAN REHAB EXIST SRN REMO DST SAN _REHAB EXIST SAN REHAB OUST SAN 2 I ' YAMIOIE 5NR MANHOLE 5NM 6ANKOLE SaR MANHOLE SRN MANHOLE SRP 626640.E S ` ,__--__ I,�7�Imo_,,,. O �- HICKORY CREEK ,6)1 NOTE: City of Peadand,Texas ALL PROPOSED SANITARY SEWER -- I -. -' '- -' - SANITARY SEWER REHABILITATION PROJECT MEASUREMENTS SHOWN ARE ALONG KNAPP ROAD AND BOBBY STREET APPROXIMATE ONLY. CONTRACTOR I PROPOSED SHALL VERIFY ALL MEASUREMENTS -- SITE PLAN PRIOR TO CONSTRUCTION. Wu. Ostcoot 'N" SHEET GLASTONBURY ._,f._-- R.. OM... 3 _ AB OF 6 1 I i muq: •