Loading...
R2008-163 2008-12-08RESOLUTION NO. R2008-163 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE CITY FACILITIES RESTORATION PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with the City Facilities Restoration Project, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to Herring Construction Company, in the amount of $1 ,553.563.00. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the City Facilities Restoration Project. PASSED, APPROVED and ADOPTED this the 8th day of December, A. D., 2008. ~ ~~~ TOM REID MAYOR ATTEST_ '"~RLAib -~Q~A Wis. C>.-= ~ a ~_ Y N G T M C ';__ '~_ =. Y S RETARY ~'`'. -' "'."v.......~.«au.a° APPROVED AS TO FORM: (!. )z DARRIN M. COKER CITY ATTORNEY PROPOSAL FORM-TOTALS Johnston LLC REPAIRS TO CITY OF PEARLAND CITY HALL, LIBRARY AND COMMUNITY CENTER - 11/26/08 TOTAL COSTS FOR CITY HALL, LIBRARY AND COMMUNITY CENTER ITEM BUILDING COST 1 CITY HALL $ 774,895.00 2 LIBRARY $ 225,303.00 3 COMMUNITY CENTER $ 175,919.00 4 SUBTOTAL (ALL BUILDINGS) $ 171-64-,7156-.80 CONTRACTOR'S GENERAL CONDITIONS 5 (INCLUDING FEES & PERMITS) $ 156,000.00 6 CONTRACTOR'S OH&P $ 185,025.00 7 CONTRACTOR'S BONDS $ 16,540.00 8 CONTRACTOR'S INSURANCE $ 17,881.00 9 TOTAL COST OF THE WORK I,S S4 S43. 00 Certified air balance and filter change add $41,000.00 Atlernate Carpet wiih same specs deduct $52,900.00 Re-install doors and frames add $18,500.00 Sales Tax if required add $127,205.00 Electrical Correction of any existing code violations is not included. Page 1 of 2 PROPOSAL FORM-TOTALS Our price is based on normal working hours Monday thru Friday 7:00am to 3:30pm. However, overtime will be required to complete the work as scheduled. But without the electrical inspection it is impossible to determine exactly how much overtime will be required. Therefore, after electrical inspection is performed and the extent of overtime is determined, this amount will be deducted from the allowances given. Electrical inspection will be performed on a room-by-room basis. We will be looking for any obvious signs of damage. Opening all j-boxes,devices or equipment that function properly and show no signs of damage is not included The pricing above for the new fixtures only covers the purchase and installation of 2x4 (acrylic)fixtures,and not the removal or discarding of the existing ones. We have also assumed that the wire currently serving the fixtures being replaced is in good working order and • can be re-used to serve the new light fixtures. The pricing above to replace the convenience outlets and covers plates, includes a 20amp commercial grade receptacle either ivory or white with a matching cover plate. Removal or discarding of existing devices is not included. Drywall No Framing No Screw Removal No Furniture moving Flooring No Furniture moving Paint Wall Paint only Doors& Frames Existing Only, No repair or supply Page 2 of 2 CITY OF PEARLAND BID PROPOSAL Addendum No.: 1 Date:..Q-23-08 Addendum No.: • Date: Addendum No.: 2 A g bate: 1 1 -1 0-OR Addendum No.: Date: Addendum No.: 3 Date: 1 1-11-0 8 Addendum No.: Date: Addendum No.: 4 Date: 1 1-13-0 8 Addendum No.: Date: Addendum No.: 5 Date: 1 1 -2 0-0 8 Addendum No.: Date: Addendum No.: 6 Date: 12-1-0 8 Addendum No.: Date: Respondents hereby represents that the only person or parties interested in this offer as principals are those named above. Respondent has not directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive . proposal. Finn Name: !Ter-ring Conaf-rllri'i nn ('mmnafv By: Al Herring Title: President Address: 1 122 6d. 20th Street Houston, TX 77008 Phone No: 713 862 3614 ATTEST: Herri n.. Enter„ri se dba Heri ri nrr rnn str( li&Respondent is a Corporation) (Typed or Printed Name) Signature Date: - 0 s END OF SECTION 05/2007 Respondent's Initials: 11/20/08 00300-3 of 3 PROPOSAL FORM-CITY HALL Johnston LLC REPAIRS TO CITY OF PEARLAND CITY HALL, LIBRARY A, CENTER - 11/26/08 PROPOSAL FORM - CITY HALL ITEM DESCRIPTION QUANTITY COST UNIT COST 1 GYPSUM BOARD (ALL) PER DRAWINGS $ 196,930.00 1.40 Sq ft 2 PAINT PER DRAWINGS $ 36,000.00 0.35 3 FLOORING(CARPET,VCT& RESILIENT BASE) PER DRAWINGS $ 88,280.00 35.14 sq yd 4 SUSPENDED ACOUSTIC CEILING TILE& GRID PER DRAWINGS $ 55,000.00 2.25 sq ft 5 FLEXIBLE HVAC DUCT 950 L.F. $ 10,450.00 11.00 L/F 6 FIBERGLASS BATT INSULATION 30,000 S.F. $ 15,000.00 .50 sq ft 7 ELECTRICAL INSPECTIONS AND REPORTING 1 $ 4,450.00 8 MECHANICAL INSPECTONS AND REPORTING 1 $ 3,950.00 9 ELECTRICAL CONVENIENCE OUTLETS& COVERPLATES 250 $ 5,100.00 20.40 ea 10 LIGHT FIXTURES 350 $ 41,300.00 118.00 ea 11 THERMOSTATS 15 $ 2,925.00 195. ea 12 HVAC GRILLES, REGISTERS &DIFFUSERS 155 $ 22,010.00 142.00 ea 13 ALLOWANCE - LIMITED DEMOLITION NA $15,000 ALLOWANCE-VOICE, DATA& 14 TELECOMMUNICATIONS CABLE NA $30,000 15 ALLOWANCE - MILLWORK NA $15,000 ITEM DESCRIPTION QUANTITY COST UNIT COST Page 1 of 2 PROPOSAL FORM-CITY HALL 16 ALLOWANCE - ELECTRICAL REPAIRS NA $60,000 17 ALLOWANCE -MECHANICAL REPAIRS NA $75,000 18 ALLOWANCE - INTERIOR GRAPHICS NA $5,000 19 ALLOWANCE - FIREPROOFING REPLACEMENT NA $8,500 20 ALLOWANCE - UNFORESEEN CONDITIONS NA $85,000 CITY HALL-TOTAL COST $ 774,895.00 Page 2 of 2 PROPOSAL FORM-LIBRARY Johnston LLC REPAIRS TO CITY OF PEARLAND CITY HALL, LIBRARY AND CENTER - 11/26/08 PROPOSAL FORM - LIBRARY ITEM DESCRIPTION QUANTITY COST UNIT COST 1 GYPSUM BOARD(ALL) PER DRAWINGS $ 4,880.00 1.4 2 PAINT PER DRAWINGS $ 12,000.00 0.35 3 FLOORING(CARPET,VCT& RESILIENT BASE) PER DRAWINGS $ 64,190.00 35.14 sq ft 4 SUSPENDED ACOUSTIC CEILING TILE&GRID PER DRAWINGS $ 34,000.00 2.25 sq ft 5 FLEXIBLE HVAC DUCT 1,600 L.F. $ 17,600.00 11.00 OF 6 FIBERGLASS BATT INSULATION 12,000 S.F. $ 6,000.00 .50 sq ft 7 ELECTRICAL INSPECTIONS AND REPORTING 1 $ 800.00 8 MECHANICAL INSPECTONS AND REPORTING 1 $ 3,950.00 9 ELECTRICAL CONVENIENCE OUTLETS& 6 COVERPLATES $ 132.00 22.00 ea 10 LIGHT FIXTURES 32 $ 4,000.00 125.00 ea 11 THERMOSTATS 1 $ 195.00 195.00 ea 12 1-IVAC GRILLES, REGISTERS& DIFFUSERS 18 $ 2,556.00 142.00 ea 13 ALLOWANCE - LIMITED DEMOLITION NA $3,500 ALLOWANCE-VOICE, DATA & NA 14 TELECOMMUNICATIONS CABLE $2,000 15 ALLOWANCE - MILLWORK NA $10,000 ITEM DESCRIPTION QUANTITY COST UNIT COST Page 1 of 2 • PROPOSAL FORM-LIBRARY 16 ALLOWANCE - ELECTRICAL REPAIRS NA $7,500 17 ALLOWANCE -MECHANICAL REPAIRS NA $6,000 18 ALLOWANCE - INTERIOR GRAPHICS NA $1,000 19 ALLOWANCE - UNFORESEEN CONDITIONS NA $45,000 LIBRARY-TOTAL COST $ 225,303.00 Page 2 of 2 PROPOSAL FORM-COMMUNITY CE Johnston LLC REPAIRS TO CITY OF PEARLAND CITY HALL, LIBRARY AND CENTER - 11/26/08 PROPOSAL FORM - COMMUNITY CENTER ITEM DESCRIPTION QUANTITY COST UNIT COST 1 GYPSUM BOARD(ALL) PER DRAWINGS $ 17,666.00 1.40 sq ft 2 PAINT PER DRAWINGS $ 14,000.00 .35 sq ft 3 FLOOR COVERING(CARPET,VCT& RESILIENT BASE) PER DRAWINGS $ 38,400.00 35.14 sq yd 4 SUSPENDED ACOUSTIC CEILING TILE & GRID PER DRAWINGS $ 11,000.00 2.25 sq ft 5 FLEXIBLE HVAC DUCT 160 L.F. $ 1,760.00 11.00 OF 6 FIBERGLASS BATT INSULATION 6,000 S.F. $ 3,000.00 .50 sq ft ELECTRICAL INSPECTIONS AND REPORTING 1 $ 2,900.00 8 MECHANINCAL INSPECTONS AND REPORTING 1 $ 3,850.00 9 ELCTRICAL CONVENIENCE OUTLETS & COVERPLATES 30 $ 660.00 22.00 ea 10 LIGHT FIXTURES 24 $ 3,000.00 125.00 ea 11 THERMOSTATS 1 $ 195.00 195.00 ea 12 HVAC GRILLES, REGISTERS& DIFFUSERS 14 $ 1,988.00 142.00 ea 13 ALLOWANCE - LIMITED DEMOLITION NA $3,500 ALLOWANCE-VOICE, DATA& NA 14 TELECOMMUNICATIONS CABLE $2,500 Page 1 of 2 PROPOSAL FORM-COMMUNITY CE 15 ALLOWANCE - MILLWORK NA $5,000 16 ALLOWANCE - ELECTRICAL REPAIRS NA $10,000 17 ALLOWANCE -MECHANICAL REPAIRS NA $15,000 18 ALLOWANCE - INTERIOR GRAPHICS NA $1,500 19 ALLOWANCE - UNFORSEEN CONDITONS NA $40,000 COMMUNITY CENTER-TOTAL COST $175,919.00 • Page 2 of 2 6 JOHNSTON, LLC 8 0 0 WILCREST DRIVE SUITE 1 5 0 H O U S T O N , TX 7 7 0 4 2 7 1 3 - 5 3 2 - 2 4 6 6 Engineers • Architects • Planners Managers ,, December 5,2008 Ms. Jennifer Lee Facilities Project Manager City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Re: Letter of Recommendation-Herring Construction Company Dear Ms. Lee: The purpose of this letter is to describe Johnston LLC's familiarity and experience with Herring Construction Company. Johnston LLC has worked with Herring Construction Company on a variety of projects over a 5 year period.During that time period,Herring Construction has employed Johnston LLC to provide A&E services for Civil,Electrical,Mechanical and Architectural design. We observed Herring Construction's performance to be timely and quality oriented. Currently,Johnston LLC is providing A&E Services for Herring Construction on a phased design/build project in Stafford, Texas that will ultimately exceed$15 million construction cost. During our work together,Herring Construction has always honored its obligations and exceeded our expectations. We consider Herring Construction a valued resource with regard to constructability and project scheduling. Our experience has been that Herring Construction is a "client oriented"contractor rather than a"project oriented"contractor as demonstrated by the numerous repeat clients. We are pleased to recommend Herring Construction Company to our clients for their$100 thousand to$20 million construction projects. Should you have any questions please feel free to call me to discuss them. Sincerely, 64 /I:e/6° Bruce Petzold, Johnston LLC Cc: Mr. Alan Johnston,P.E.—Hostetler Johnston—alanj@johnston-llc.com 7 Repairs to City of Pearland City Hall,Community Center and Library Proposal Tabulation Form Other Acknowledge Respondents City Community Construction Total All Insurance Addendum No. Name Hall Library Center Cost Buildings &Bonds 1 2A 2B 3 4 5 6 Exceptions Herring Const. 774,895.00 225,303.00 175,919.00 377,446.00 1,553,563.00 1 ✓ ✓ ✓ ✓ ✓ ✓ ✓ No lamail&Smith No Response Ft.Bend Mechanical No Response Hull&Hull 885,708.00 307,127.00 224,211.00 378,393.00 1,795,439.00 ✓ ✓ ✓ ✓ ✓ I. ✓ ✓ Yes • Date:12/02/2008 Submission Time:2:00 pm